Say Tugas 2 Rekayasa Pondasi 2.docx

  • Uploaded by: azizul ilham
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Say Tugas 2 Rekayasa Pondasi 2.docx as PDF for free.

More details

  • Words: 691
  • Pages: 5
REKAYASA PONDASI 2 JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI SRIWIJAYA Jln. Srijaya Negara, Palembang 30139 Telp. 0711-353414 Fax. 0711-355918 Email. [email protected] Nama : AZIZUL ILHAM PRATAMA Kelas : 6.SD NIM

: 061530100760 TUGAS REKAYASA PONDASI 2

1.

Diketahui kelompok tiang pancang terdiri dari 21 buah tiang pancang dengan ukuran penampang 40 x 40 cm dengan penulangan 12 Ƙ 22. Tegangan izin beton šœŽĢ…b = 100 Kg/cm2,šœŽĢ…s = 1850 Kg/cm2, ukuran poer = 0,80 x 4,10 x 9,30 m. Kedalaman tiang pancang 22 m. Data tanah diambil dari percobaan sondir. Harga Konus pada kedalaman 20m, p = 28 kg/cm2 Harga Cleef pada kedalaman 20m, cā€™ = 685 Kg/cm

Rekayasa Pondasi 2 Azizul Ilham Pratama (061530100760)

REKAYASA PONDASI 2 JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI SRIWIJAYA Jln. Srijaya Negara, Palembang 30139 Telp. 0711-353414 Fax. 0711-355918 Email. [email protected] Ditanya : Perbandingan daya dukung kelompok tiang terhadap daya dukung tiang individu (single pile) ! Penyelesaian A. Menentukan daya dukung tiang individu 1) Berdasarkan Kekuatan Bahan Tiang A tiang = Fb + Fy = (40 x 40) + (12 x 3,8) = 1645,6 cm2 P tiang = šœŽĢ…b . A tiang = 100 x 1645,6 = 164560 Kg =164,56 ton 2) Berdasarkan Kekuatan Tanah Q tiang = (Atiang . p/3) + (O.cā€™/5) A tiang = 40 x 40 = 1600 cm2 Harga konus pada kedalaman 20 m, p = 28 Kg/cm2 Harga cleef pada kedalaman 20 m, cā€™ = 685 Kg/cm Q tiang = (1600 x

28 3

) + ( 160 x 685/5) = 36853,3 Kg = 36,85 ton

Jadi daya dukung tiang individu (Qsp) = 36,85 ton B. Menentukan daya dukung kelompok tiang pancang (pile group) 1) Berdasarkan Perhitungan Bina Marga Qt = C.Nc.A + 2 (B + Y).cā€™ A = B.Y = 300 x 820 = 246000 cm2 Nc = (1 + 0,2 B/Y) Ncs Ncs = 9 300

Nc (1+ 0,2 x 820 ) x 9 = 9,66 Qt = 0,07 x 9,66 x 246000 + 2 (300 +820) x 685 = 1700745,2 Kg = 1700,75 ton F = 3,0 Qpg = 1700,75/3 = 566,92 ton Untuk 1 tiang dalam kelompok tiang Qsp = Qpg/21 = 566,92/21 = 27 ton 2) Berdasarkan Effisiency dari kelompok tiang pancang (Pile group) a. Metode Feld

Rekayasa Pondasi 2 Azizul Ilham Pratama (061530100760)

REKAYASA PONDASI 2 JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI SRIWIJAYA Jln. Srijaya Negara, Palembang 30139 Telp. 0711-353414 Fax. 0711-355918 Email. [email protected] Eff tiang A = 1 ā€“ 8/21 = 13/21 tiang Eff tiang B = 1 ā€“ 5/21 = 16/21 tiang Eff tiang C = 1 ā€“ 3/21 = 18/21 tiang Effisiency dari kelompok tiang : 5 tiang A = 5(13/21) = 65/21 tiang 12 tiang B = 12(16/21) = 192/21 tiang 4 tiang C = 4(18/21) = 72/21 tiang Jumlah = 329/21 tiang = 15,667 tiang Eff tiap tiang = 15,667/21 = 0,746 tiang Daya dukung tiang (Q) Q = Qsp. Eff tiap taing Q = 36,85 x 0,746 = 27,49 ton b. Metode Uniform Building Code Eff = 1 ā€“ ʟ/90 ((n ā€“ 1).m + (m ā€“ 1).n))/(m.n) ʟ = arc tg d/s = arc tg 40/130 = 17Ā° 6ā€™ 9,82ā€ Eff = 1 ā€“ (17Ā° 6ā€™ 9,82ā€/90Ā°((7 ā€“ 1)3 + (3 ā€“ 1)7)) / (3 x 7) = 0,71 Q = Qsp x Eff tiap tiang Q = 36,85 x 0,71 = 26,164 ton c. Metode Los Angeles Group Eff = 1 ā€“ (d/Ļ€.m.n) {(m(n ā€“ 1) + (m ā€“ 1) + āˆš2 (š‘š āˆ’ 1)(š‘› āˆ’ 1)} Eff = 1 ā€“ (0,4/3,14 x 3 x 7) {(3(7 ā€“ 1) + 7(3 ā€“ 1) + āˆš2 (3 āˆ’ 1)(7 āˆ’ 1)} Eff = 0,776 Q = Qsp x Eff tiap tiang Q = 36,85 x 0,776 = 28,602 ton Dari hasil yang didapat maka diambil nilai Q yang terkecil yaitu 26,164 ton

Rekayasa Pondasi 2 Azizul Ilham Pratama (061530100760)

REKAYASA PONDASI 2 JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI SRIWIJAYA Jln. Srijaya Negara, Palembang 30139 Telp. 0711-353414 Fax. 0711-355918 Email. [email protected]

Rekayasa Pondasi 2 Azizul Ilham Pratama (061530100760)

REKAYASA PONDASI 2 JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI SRIWIJAYA Jln. Srijaya Negara, Palembang 30139 Telp. 0711-353414 Fax. 0711-355918 Email. [email protected]

Rekayasa Pondasi 2 Azizul Ilham Pratama (061530100760)

Related Documents

Rekayasa Pondasi: Kelompok 1
November 2019 18
Pondasi 2
May 2020 22
Pondasi
June 2020 27

More Documents from "Muhammad Irfan"