SAP TRAINING PROGRAM CONTENTS • • • • • •
Brief up of SAP Company structure and material codification Basics Process mapping PP and QM important transaction codes Practice of transactions.
Introduction to SAP R/3 SAP is a by product of a German company SAP AG . SAP SYSTEM, APPLICATION AND PRODUCTS IN DATA PROCESSING. SAP system consist of a complex integration of different modules. SAP runs on fourth generation programming language called ABAP. SAP is an Enterprise Resource planning (E.R.P) software product. SAP process transaction in real time and provide seam less information. Single data entry multiple reports. Transparent system. Information flow with security.
Purpose of R/3 The sole purpose of a R/3 system is to provide suite of tightly integrated ,large scale business application. The standard set of applications delivered with each R/3 system are the following :
PP ( Production Planning) SD (Sales & Distribution) CO (Controlling) PS (Project System) IS (Industry solutions) PM (Plant Maintenance)
MM( Materials Management) FI (Financial Accounting) AM (Fixed Asset Management) WF (Work Flow) HR (Human Resources) QM (Quality Management)
The applications are called the functional modules of R/3. SAP comes prepackaged with the core business application with more than 73000 tables in Standard R/3 product.
R/3 Architecture SAP works in 3 Tier Client/server configurations. The architecture can be categorized into following parts
• Presentation server • Application server • Database Server Presentation Layer SAP GUI, SAP User
Application Layer ABAP Programs
Database Layer SAP Data Base, Server
ORGANIZATIONAL STRUCTURE Our Client is
500
Company code for Bhushan Steel is BSSL
SBPW
RM01
SBST
KPST
Work Center
Cost Center
CRM02
SP0103
Cost Center and Work Center Relationship
Cost Center for 6HI Hitachi
SP0104 Cost Center for CTL Wider
SP0111 CRM02
Cost Center for CR Slitter Wider
CTL08
CTL09
CTL10
CTL14
SP0110 CTL15 CRS01
CRS02
CRS04
CRS08
CRS07
MATERIAL CODING Finish material code:
CR Division
S Coil / Sheet
0250
OD
Thickness
Grade
12500
CRS0250OD12500ASP Semi-Finish material code: CR Division
OD
0250
ASP
Grade
Thickness
Process
CR0D0250ASP Scrap material code:
CR SIDE TRIMMING
Width
ASP Process
HOW TO CHANGE PASSWORD
nishant
Now click on New Password tab button
Enter User name
Now enter current password
A window will pop-up, where you have to enter new password and enter it again to confirm.
Here you have to enter new password.
Here you enter the password again to confirm and change the password.
Press OK to change the password
SAP Easy Access menu shows with a message in the status bar, Password changed
Menu Bar Standard Tool Bar
Title Bar Application Tool Bar
HOW TO CREATE A NEW SESSION
This is the icon, used to create a new session.
A new session can also be created by typing ‘/O’ before the T-code.
HOW TO CREATE A VARIANT
ZPPWIPGR
Press Enter or press this button to go to the transaction’s Selection screen
crm02 ZP01
Press Save button to make a variant
When the save button is clicked a new screen opens and it is ABAP: save as variant screen.
NISHANT
Daily report
Click on save to save variant
Here status bar shows that the variant is saved
This is Get Variant Icon through which variant is selected.
Next time when we have to run the same report, we open the transaction and click on GET VARIANT Icon. A window will pop-up which is list of variants and we can select our variant from that list.
We select the variant from this list. Now the saved fields would fill automatically.
The saved fields have been copied automatically.
HOW TO CREATE A LAYOUT
These are the three Icons that are used for layout management.
Once the report is open we can change the data that we see on the screen, we can also save these changes that we made, so that next time when we open the report we don’t have to make these changes again and again. And all this is done through the three Icons that were highlighted in the previous slide.
Change layout Icon When u press this Icon a screen pops-up and u can see two lists. List on the left reads COLUMNS and list on right is COLUMN SET. COLUMNS: This list is displayed in the report. COLUMN SET: From this list we select columns to be displayed.
Displayed list
Columns can be selected from this list to display
Once the report is open we can change the data that we see on the screen, we can also save these changes that we made, so that next time when we open the report we don’t have to make these changes again and again. And all this is done through the three Icons that were highlighted in the previous slide.
Change layout Icon
Select layout Icon
When we press this Icon a window pops-up and a list of already saved layouts is displayed. From this list appropriate layout can be selected.
List of layouts
Once the report is open we can change the data that we see on the screen, we can also save these changes that we made, so that next time when we open the report we don’t have to make these changes again and again. And all this is done through the three Icons that were highlighted in the previous slide.
Change layout Icon
Select layout Icon
Save layout Icon When we press this Icon a window popsup where we enter layout name and description and then save it.
ORDER TYPE ZP01
CR WIDER SEMI – FINISH MATERIAL
ZP02
CR WIDER FINISH MATERIAL
ZP03
GP SEMI – FINISH MATERIAL
ZP04
GP FINISH MATERIAL
ZP05
CR NARROW SEMI – FINISH MATERIAL
ZP06
CR NARROW FINISH MATERIAL
ZP07
BEL GATE PRODUCTION ORDER
ZP08
POWER PLANT PRODUCTION ORDER
ZP09
GAS PLANT & UTILITIES PRODUCTION ORDER
ZP10
BRANCHES PRODUCTION ORDER
SAP Process Flow Chart Quotation Creation (VA21)
(MD04)
(SD)
Technical approval of quotation. (ZTECHAPPROVE1& 2)
(plant)
Commercial approval of quotation. (ZCOMMAPPROVE)
Stock requirement list. (PPC)
Material requirement planning is done for finished product. (MD03)
(PPC)
BOM Explosion (CS12)
(PPC)
(SD)
Creation of semi-finished production order. Creation of Sales order. (VA01)
(SD)
(CO01)
(PPC)
Semi-finished stock. (Plan able, Hold) (ZFGS)
(PPC)
Goods issue (MB1A)
(CO11N)
(PROD)
Goods receipt
(PPC)
Planning Sheet/ WIP Report (ZPPS) / (ZPPWIPGR)
Confirmations at every work center
(PROD.)
(ZMB31CG)
(PROD)
Creation of production order for finished product (MD04)
(PPC)
Goods issue Quality check, Batch Creation and Sticker printing (QE11)
(QM)
(MB1A)
(PPC)
Planning Sheet / WIP Report (ZPPS) / (ZPPWIPGR)
(PROD.)
Delivery Order. (VL01N)
Quality check, Batch Creation and Sticker printing (QE11)
(QM)
Confirmation at every work center. (CO11N)
(PROD.)
Finished stock. (ZFGS)
Loading Slip. (ZS001)
(SD)
PDIR. (ZQPDIR)
(QM)
(PROD.)
Goods Receipt (ZMB31CG)
(SD)
(PPC)
TC Making. (ZQTEST)
(QM)
Usage Decision. (QA32)
(QM)