Sap Question Bank.docx

  • Uploaded by: Anjali
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Sap Question Bank.docx as PDF for free.

More details

  • Words: 1,119
  • Pages: 6
SAP Questions 1. Which is the heart of ERP System? b A. Information. B. Database. C. Customers. D. Employees. 2. ERP supports __________ currency value. a A. multiple. B. single. C. three. D. five. 3. Who are the primary users of ERP systems? b A. Sales, marketing, customer service. B. Accounting, finance, logistics, and production. C. Customers, resellers, partners, suppliers, and distributors. D. All of the above. 4. The most important step of ERP implementation is _________ phase. C A. installing. B. training. C. gap analysis. D. testing. 5. An enterprise is a group of people with ________. A A. common goal. B. separate goal for each department. C. multiple goals. D. two or more goals. 6. Which of the following occurs when everyone involved in sourcing, producing, and delivering the company's product works with the same information? D A. Eliminates redundancies. B. Cuts down wasted time. C. Removes misinformation D. All of the above. 7. The elapsed time between placing an order and it receiving it is also known as _____. A A. elapsed time. B. waiting time. C. time interval. D. expected time. 8. The ____________ maintains reports of warehouse supplies. B A. ERP financial module. B. ERP Inventory software module. C. ERP Resource module. D. ERP verification module. 9. Customer specific products are also known as __________. B

A. make-to-stock. B. make-to-order. C. goods. D. expected products. 10. Using __________ system, business can gain effective control over engineering change orders.a A. engineering change control. B. engineering change order. C. inventory. D. production planning. 11. In the case of make-to-order items, the ERP systems save time by integrating with _______ systems. A. engineering change control.c B. engineering change order. C. CAD and CAM. D. CAD. 12. Expand BPR. A A. Business Process Reengineering. B. Business Product Reengineering. C. Business Process Refactoring. D. Big Process Reengineering. 13. _________ is the process by which different functional areas can work together to design and develop a product that meets the needs of the customer. B A. Software Engineering. B. Concurrent Engineering. C. Knowledge Engineering. D. Database. 14. ____________ enables equipment managers to identify components with chronic repair problems. A A. Component tracking. B. Equipment tracking. C. Plant maintenance calibration tracking. D. Preventive maintenance control. 15. _________ is the first phase in BPR. A A. Begin organizational change. B. Identifying BPR opportunities. C. Reengineering the process. D. Blueprint the new business system. 16. Many companies offering _______ for help desks. B A. packages B. prepackages ERP support knowledge base. C. documentation. D. knowledge base. 17. For ERP implementation, the representatives should select from ______. B A. one department. B. each department.

C. in house team. D. executive committee. 18. ______ bringing out ERP application management tools.a A. Vendors. B. Consultants. C. Employees. D. Technical support team. 19. Expand the term EAI. A A. Enterprise Application Integration. B. ERP Application Integration. C. Enterprise Application Information. D. ERP App Integration. 20. ________ module facilitates the process of maintaining the appropriate level of stock in a warehouse. C A. HR. B. Project planning. C. Material management. D. Purchasing. 21. Who will point out the issues that are specific to the company during ERP implementation? A A. In-house team. B. Management. C. Vendor. D. End-user. 22. ________ is designed to handle all inter-program communications logic through message queues. A A. Message Oriented Middleware. B. ERP. C. Supply Chain Management. D. Customer Relationship Management. 23. The _______ include package vendor, hardware and peripheral vendor, networking people, consultants, and employees. C A. testing. B. training. C. ERP implementation. D. ERP planning. 24. ________________ is the people who will be using the ERP system once it is in place. B A. Management. B. End-user. C. Consultant. D. Vendor. 25. In ERP, _______ supports lead generation and direct mailing campaign.d A. manufacturing module. B. financial module. C. purchasing module.

D. marketing module. 26. During ERP implementation __________ should be converted into tasks and should be allocated to the right people. C A. rules. B. procedures. C. methodologies. D. functionality 27. _________ are the people who have developed the ERP packages. D A. Consultants. B. End users. C. Administrative team. D. Vendors. 28. Which team arranges meetings and documentation during ERP implementation? B A. Work team. B. Administrative support team. C. Project management. D. Technical support team. 29. ______ provides planning, scheduling and control of facilities and equipment.b A. HR module B. Plant maintenance control. C. Sales and distribution. D. Finance. 30. Who is the head in ERP implementation team? B A. Project management. B. Executive committee. C. Work team. D. Technical support team. 31. An ERP implementation involves ______________________ changes. D A. process. B. technological. C. cultural. D. both technological and cultural. 32. Which of the SAP platform allows customers to achieve more value from IT investments? A A. SAP NetWeaver. B. SAP Ventures. C. SAP Research. D. All the above. 33. Users with heavy data analysis needs should include the cost of _________ in the ERP budget. C A. software. B. analysis tool. C. data warehouse. D. hardware. 34. In ERP system ______ is important. A

A. upgrading techniques. B. modification. C. maintenance. D. evaluation. 35. Project planning phase is ________________________ in ERP implementation. B A. first phase. B. third phase. C. fifth phase. D. seventh phase. 36. ___________ function helps in hiring the right people with the right skills.a A. Recruitment management. B. Personnel administration. C. Personnel management. D. Organizational management. 37. ______ is one of the objectives when selecting a ERP package. B A. Accuracy. B. Flexibility. C. Project planning. D. Gap analysis. 38. In the initial stages ERP packages were targeted at ________ industry. A A. manufacturing. B. non-manufacturing. C. both manufacturing and non-manufacturing. D. service oriented industry. 39. ERP packages are ________ and set of functionalities. B A. same architecture. B. different architecture. C. same concept. D. different concept. 40. Which phase is most difficult phase in ERP implementation? A A. Getting down to work. B. Going live. C. Post implementation. D. Configuration. 41. During the second phase of ERP implementation _______ will be created. D A. model of existing system. B. data design. C. module design. D. prototype. 42. Which is the most critical phase in ERP implementation? B A. Understanding the problem. B. Defining solutions.

C. Getting down to work. D. Going live. 43. Which is the first phase in ERP implementation? A A. Understanding the problem. B. Defining solutions. C. Getting down to work. D. Going live. 44. _______ is the last phase in ERP implementation life cycle. C A. Testing. B. End user training. C. Post implementation. D. Going live. 45. The project planning phase will be headed by _______. C A. management. B. vendor. C. ERP in-charge. D. consultant.

Related Documents

Sap Question Bank.docx
April 2020 11
Sap Sd Question 1 02nov2007
November 2019 4
Question
May 2020 22
Question
November 2019 43
Question
November 2019 33

More Documents from ""