Ruger 22-45 Bolt Dis Assembly

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Ruger 22-45 Bolt Dis Assembly as PDF for free.

More details

  • Words: 260
  • Pages: 3
Ruger 22/45 Disassembly of the Bolt

1. Field Strip the gun. 2. Lift out Recoil Spring Assembly (Fig. 1).

3. Remove Firing Pin Stop (Fig. 2 red arrow).

4. Lift out Firing Pin and the Rebound Spring and Support (Fig 3).

5. Push down and hold the Extractor Plunger (Fig. 4 red arrow). Rotate the top of the Extractor to where the hook is trying to touch the bolt face (Fig. 4 blue arrow), to make the bottom of the Extractor appear . Slide the Extractor sideways at 90 degrees to remove (Fig. 4 green arrows). You may want to hold the bolt so the green arrows point at the ground to allow gravity to help remove it.

6. Release pressure and remove the Extractor Plunger and Spring.

Assembly of the Bolt 1. Insert Extractor Plunger and Spring with the longest end facing out (Fig. 5).

2. Push the Extractor down on the Plunger until the tip of the Extractor touches the bolt face (Fig. 6 red arrow), then push the Extractor in to lock it into place (Fig. 6 blue arrow).

3. Install Rebound Spring and Support, bent end down (Fig. 7 blue circle).

4. Install the Firing Pin so that the end of the Rebound Spring is touching the part sticking out below the Firing Pin (Fig. 7 red lines). 5. Install the Firing Pin Stop by pushing forward on the Firing Pin to line up the holes. 6. Install the Recoil Spring Assembly with the curved end matching the curve of the bolt. 7. Reassemble the gun.

Related Documents

2245
November 2019 10
93 Spanish Dis Assembly
April 2020 14
2245
May 2020 10
Bolt
November 2019 22