PROJECT SCHEDULING BY: PRABJOT KAUR YOGITA

PROJECT SCHEDULING

DETERMINING THE OVERALL SCHEDULE WITH THE MILESTONES

DEVELOPING THE DETAILED SCEDULEOF THE VARIOUS TASKS

PROJECT SCHEDULE (p) • A project Schedule is at two levels Overall Schedule and Detailed Schedule. • Overall Schedule comprises of major milestones and final date. • Detailed Schedule is the assignment of lowest level tasks to resources

OVERALL SCHEDULE (yogita) • A schedule is modeled as depending on the total effort, which in turn depends on the size. • The IBM Federal Systems Divisions found that the total duration M, in calendar months can be estimated by M=4.1E • In COCOMO, the equation for schedule for an organic type of software is M=2.5 E

Also….(y) • Depends heavily on the effort estimate. • For an effort estimate, some flexibility exists depending on resources assigned. • Stretching a schedule is easy; compressing is hard and expensive.

Square Root Check(y) • Example A 56 Person-Month project can be done in 8 Months (7 People) or 7 Months (8 People).

MILESTONES IN THE PROJECT

Manpower Ramp-up (prabjot) PTS

Design

Build

Test

COCOMO GIVES…..(p) 19% for design 62% for programming 18% for integration

(yogita) • Major tasks fixed while planning the milestones are broken into small schedule activities. • This is done in hierarchical manner. • Developing the detailed design for each module. • Review of each detailed design. • Fixing of defects found and so on.

SCHEDULING IS AN ITERATIVE PROCESS(p) • Firstly, when the detailed design are broken into tasks, the effort estimates re set. • At each level of refinement, the project manager determines the effort and checks it against the effort estimates. • If this detailed schedule is not consistent with the Overall Schedule and effort estimates, the schedule is changed. • If it is found that the Detailed Schedule cannot match the milestone effort and schedule, then the earlier estimates must be revised.

Detailed Schedule(p) • Detailed Scheduling not done completely in the start. • MS Project for keeping it. • Detailed Schedule is the most lively document for managing the project. • Any activity to be done must get reflected in the Detailed Schedule.

Detail schedule(y) • Each task has name, date, duration, resource etc assigned • % done is for tracking (tools use it) • The detailed schedule has to be consistent with milestones – Tasks are sub-activities of milestone level activities, so effort should add up, total schedule should be preserved

Rest is team structure, will do in sumtym…or read 4m d buk…

Related Documents

Rough
November 2019 29
Rough Notes
May 2020 15
Luna (rough)
June 2020 11
Rough Draft
December 2019 27
Rough Storyboard
November 2019 27
Brochure Rough
April 2020 14

More Documents from "Eamon Barkhordarian"