Project: Page
Item
Description
Amount
1
Preliminaries
456,380.00
2
BQ 2 - Drains
-
0%
3
BQ 3 - Box Culverts
-
0%
4
BQ 4 - Road Works
5
BQ 5 - Temp. Works
6
BQ 6 - Misc Works
73,140.00 45,000.00
79%
13% 0% 8%
574,520.00 1.5% 1.0%
bond Insurance Tender sum
10/22/2008 11:27:30
574,520.00
9539271.xls/SOT_1/1
79%
-574,520.00
5233 109.79
10/22/2008 11:27:30
9539271.xls/SOT_1/2
Project: page item
Description
Qty
unit
Rate
amount
PRELIMINARIES CONTRACT PERIOD
1
A B C
1st Phase mths Overall 18 mths LD 1 day DLP 24 mths OPTION MODULE A & C Public Liability Insurabce ) Workmen Comp ) Damage to property - Contractor not Negligent )
$2,300.00 5300000 1.00% 0.75% 0.50% 2.25%
119,250.00 incl incl 119,250.00
2
A
Site Office Toilet Exec Desk & Chair Officfe Desk & Chair Conferenve Table Chairs 4-drawer Filing Cabinet Plan Rack + 12 Racks Pin-up Board Whiteboard High Steel Cabinet Sample Rack
74 m2 1 no 1 set 2 set 1 no 12 no 1 no 2 set 2 no 2 no 1 no 1 no
$300.00 $18.00 $300.00 $250.00 1,200.00 $60.00 $200.00 $300.00 $180.00 $100.00 $500.00 $200.00
22,200.00 3,600.00 300.00 500.00 1,200.00 720.00 200.00 600.00 360.00 200.00 500.00 200.00 30,580.00
B
Maintenance
4 mth
$600.00
2,400.00
C
Removal of ofice on completion
1 sum
$5,000.00
5,000.00
D
TOL Rental
mth
$1,250.00
E
Computer
2,400.00 5,000.00 1 set
$5,000.00
5,000.00 5,000.00 42,980.00
3
A
Digital Camera
1 no
$1,200.00
1,200.00
B
Telephone System Telephone Answering Machine Hotline with voicemail answer machine
1 sum 1 no 1 no
$500.00 $200.00 $200.00
500.00 200.00 200.00
C
Telephone Usage
4 mth
$200.00
800.00
D
Fax Machine Telephone Usage
1 no 4 mth
$800.00 $200.00
800.00 800.00
1,200.00
900.00 800.00
1,600.00 4,500.00 4
A
Photocopy Machine Consumables
B
Other Site Bldgs
C
Temp. Electrical Installation
1 no 4 mth
$1,800.00 $200.00
sum
$5,000.00
1 sum
$5,000.00
1,800.00 800.00 2,600.00 5,000.00 5,000.00 7,600.00
5
A
Temp. Water
4 mth
$1,200.00
4,800.00
B
Temp. Lighting & Power
4 mth
$1,200.00
4,800.00
4,800.00 4,800.00 9,600.00 6
A
Temp. Toilets
B
Maintenance of ditto
C D
Cleaning etc Demolish etc on completion
4 mth
$250.00
mth
$250.00
1,000.00 1,000.00 incl
sum
$1,000.00
-
10/22/2008
9539271.xls/BQ 1 _ preli/3
1,000.00 7
A
Project Signboard
3 no
$3,500.00
10,500.00
B
removal of ditto
3 no
$500.00
1,500.00
C
Safety Supervisor
4 mth
$3,500.00
14,000.00
D
Safety Officer
4 mth
$4,000.00
16,000.00
10,500.00 1,500.00 14,000.00 16,000.00 42,000.00 8
A
Safety for SO etc
B
Allow for other expenses
C
Watching
D
Maintenance of Roads, Nuisance etc
1 sum
$1,500.00
1,500.00 1,500.00 incl
mth
$2,400.00
4 mth
$1,000.00
4,000.00 4,000.00 5,500.00
9
A
ECO
4 mth
$2,500.00
10,000.00
B
Noise Control monitoring Noise Meter Control Measurees
4 mth 3 set 1 sum
$500.00 $4,000.00 $8,000.00
2,000.00 12,000.00 8,000.00
C
Periodic Cleaning
4 mth
$1,200.00
4,800.00
D
Temp. Access
1 sum
$15,000.00
15,000.00
E
Maintain ditto
10,000.00
22,000.00 4,800.00 15,000.00 incl 51,800.00 10
A
Pests Controll
4 mth
$250.00
1,000.00
B
Full time PM
4 mth
$4,500.00
18,000.00
C
Precondition Survey
1 sum
$5,000.00
5,000.00
1,000.00 18,000.00 5,000.00 24,000.00 11
A
Provision of Services Detector Instrument
1 no
B
Cable & services Detection
1 sum
$3,000.00
3,000.00
$10,000.00
10,000.00
3,000.00 10,000.00 13,000.00 12
A
Maintenace of Drainage Reserves
4 mth
$500.00
2,000.00 2,000.00 2,000.00
13
A
Curing Tank
1 no
$250.00
250.00
B
PE for Temp works
4 mth
$6,000.00
24,000.00
C
Setting Out & Levels
1 sum
$10,000.00
10,000.00
D
Cleaning on completion
1 sum
$10,000.00
10,000.00
250.00 24,000.00 10,000.00 10,000.00 44,250.00 14
A
As- built Drawing @ 0.5%
B
Transport for SO / COW
C D E
ditto ditto ditto
0.5% %
$5,300,000
26,500.00
$900.00
3,600.00
26,500.00 4 mth
3,600.00 incl incl incl 30,100.00 15
A
Handphone
B
Excess phone charge (provisional)
4 mth
$200.00
800.00 800.00
pc
2,000.00 2,000.00 2,800.00
10/22/2008
9539271.xls/BQ 1 _ preli/4
B C E
Others ( to be distributed in above) Full time site engr Full time PRO Others (site Management & Supervision)
4 mth 4 mth 4 mth
$3,500.00 $2,500.00 $8,000.00
14,000.00 10,000.00 32,000.00 56,000.00
56,000.00
456,380.00
10/22/2008
9539271.xls/BQ 1 _ preli/5
Project: Description 2
qty
Unit
rate
amount
1 A
BAKAU PILES Demolish extg roadside drains
197
m
-
B
RC G40 box drain x 1800mm wide Exc 1.0m n.e. 2.0m
151
m
-
2
2 A
850 x 1000mm Access Chambers n.e 1.0m deep to inverts
16
no
B
Exceeding 1.0m but n.e.2.0m deep
5
no
C
Box out for 850 x 1000mm grating
12
no
D
Box out for 850 x 1000mm grating
9
no
E
850 x 1000mm galv. Ped. grating
12
no
F
850 x 1000mm gal. HD VEH grating
9
no
-
2
3 A
1500 x 1500mm ACCESS CHAMBER Exceeding 1.0m but n.e.2.0m deep
1
no
B
Box out for 1500 x 1500mm grating
1
no
C
1500 x 1500mm gal. HD VEH grating
1
no
D
Allow for roadside drain connections
1 item
E
Allow for making good
1 item
4.00
-
150 160
290 40 -
-
10/22/2008
2
640 160
6
9539271.xls/BQ 2/6
7680
Project: Description 3
qty
Unit
rate
amount
1
G40 x 1500mm wide box culvert
A
Exceeding 1.0m deep & n.e 2.00m deep
35
m
-
1500 x 1050mm box culvert 1500 x 1400mm box culvert
23 12
m m
-
G40 x 1800mm wide box culvert Exceeding 1.0m deep & n.e 2.00m deep
46
m
-
-
3
2
3
3 A
G40 x 2400mm wide box culvert exceeding 1.0m & n.e. 2.00m deep
140
m
-
B
3
250mm thk approach slab for 1500 x 1050mm box culvert 1500 x 1400mm box culvert 2400 x 2000mm box culvert
363
m2
23 12 37
m m m
no
25,242.69 16,608.40 62,888.40 104,739.49
4 A
2100 x 1000mm sump
1
B
Traffic control measures
4 item
-
C
Other expenses
1 item
-
-
-
-
-
10/22/2008
9539271.xls/BQ 3/7
3
-
10/22/2008
9539271.xls/BQ 3/8
Project:
4
Description
qty
Unit
rate
amount
1 A
Prepare road for road raising etc
1,200 m2
B
Demolish kerbs
C
Reinstate Type II Road
1,040 m2
300mm sub-base 200mm graded stones 90mm asphalt premix 40mm asphalt premix
312 208 1,040 1,040
m3 m3 m2 m2
Reinstate Type II Road
160
m2
-
110mm asphalt premix 40mm asphalt premix Milling of Road
160 160 160
m2 m2 m2
-
1 item
-
-
D
340
m
-
-
-
E
Road markings to match extg
F
Re-cambering of Roads
1 item 1,011 m3
-
4
2 A
Road Works 125 x 300mm K2 kerbs
B
Precast Drop Inlet Chambers
C
250mm dia PVC Scupper pipes
280
m
-
58
no
-
174
m
-
D
Demolish extg footpath
380 item
-
E
RC G25 footpath
380
m2
-
100mm RC G25 H/C Lean Conc 50mm thk BRC A5
38 57 19 380
m3 m3 m3 m2
-
-
4
3 A
Break up & remove conc bollard New 230mm dia bollard
6 6
no no
-
B
Excavate trench for 150mm dia pipe
65
m
-
195 195 390
m3 m3 m2
-
Excavate trench Disposal Stuttering
10/22/2008
9539271.xls/BQ4/9
C
Approved granular fill
65
m
-
130
m3
-
65
m
-
Type A fill
D
150mm ductile iron pipe
E
Allow for all expenses
item
F
Allow for drain support
item -
4
A
Excavate trench for 200mm pipe
9
m
-
32 m3 32 m3 58 m2
-
Excavate trench Disposal Stuttering
B
Concrete G25 bed
9
m
-
2 m3 0.5 m3 2 m3
-
Concrete G25 bed Concrete G15 blinding Haunching
C
200mm dia DI pipe
9
m
-
D
Allow for all expenses
item
E
Allow for drain support
item -
5
A
Excavate trench for 200mm pipe
32
m
-
112 112 205
m3 m3 m2
-
Concrete G25 bed
32
m
-
Concrete G25 bed Concrete G15 blinding Haunching
7 m3 1.6 m3 6 m3
-
200mm dia DI pipe
32
-
Excavate trench Disposal Stuttering
B
-
C
m
D
200mm Y- junction connections in undercrossing to culverts etc
10/22/2008
5
no
-
9539271.xls/BQ4/10
E
Allow for all expenses
item
F
Allow for drain support
item -
6
A
Precast MH 1050mm dia excedding 2.00m n.e 2.5mm deep
1
no
-
B
ditto 3.00 - 3.50m deep
3
n0
-
C
Extra to locate & breakup extg MH
1 item
-
D
Allow for CCTV inspection of sewers
105
m
-
4
7 A
Reinstatement Works Temp. fencing along Lor 35
1 item
-
115 B
Reinstatement of boundary walls, fencings etc
m
1 item
73,140.00 73,140.00
wall Footpath drains
C
Attendance for diversion of services
337 337 337
m m m
1 item
73,140.00
73,140.00
10/22/2008
73,140.00
9539271.xls/BQ4/11
4
Project: Description Bill 5 - Temporary Works 5
1 A
qty
Provide all nec piling equipment
Unit
1 item
rate
amount
-
Sheet piling for Temp.Earth Retaining System (TERS) B
TERS for 1.5m wide culvert
700
m2
-
SSP III a tonnage @ 700.8kg/pc 350 x 350 x 159kg/m waler tonnage @ 159kg per m 305 x 305 x 106kg/m strut tonnage @ 106kg/m
146 102 58 9 23 2
pcs t m t m t
700 12 10%
m2 t %
Assume buy materials @ 45% Material cost drive walers & strut lab PE fees
C
TERS for 1.8m wide box culvert SSP III a tonnage @ 700.8kg/pc 350 x 350 x 159kg/m waler tonnage @ 159kg per m 305 x 305 x 106kg/m strut tonnage @ 106kg/m
7,880
m2
Material cost drive walers & strut lab PE fees
D
9 -
pcs t m t m t
7,880 132 10%
m2 t %
-
TERS for 2.40m wide box culvert
3,360
m2
SSP III a tonnage @ 700.8kg/pc 350 x 350 x 159kg/m waler tonnage @ 159kg per m 305 x 305 x 106kg/m strut tonnage @ 106kg/m
700 491 280 45 140 15
pcs t m t m t
struts etc 146
1,642 1,150 657 104 263 28
Assume buy materials @ 45%
sheet pile
2
1,642
-
104
-
28
-
Assume buy materials @ 45% Material cost drive walers & strut lab PE fees
700 -
m2 t %
-
1 item
-
3,360 59 10%
45 sht pile 1743 T
15
walers 203 T
2,488 E
Excavate within the TERS
Excavate 1.5 & 1.8 culvert Excavate 2.4 culvert Disposal
F
Extract & remove TERS materials
4,290 2,100 6,390
m3 m3 m3
-
11,940
m2
-
1,743.24
G
Backfilling
10/22/2008
1 item
9539271.xls/BQ 5/12
203
Backfill with imported earth 1.5 x 1.05 drain /box culvert 1.5 x 1.40 drain /box culvert 1.8 x 1.60 drain /box culvert 2.4 x 2.00 ditto 1.8 x 1.60 drain /box culvert
6,390 (80) (50) (221) (1,165) (725)
m3 m3 m3 m3 m3
-
5
2 A
Left-in sheet piles
200
m2
-
SSP III a tonnage @ 700.8kg/pc B
Other expenses
42 29
pcs t
-
-
10/22/2008
-
5
9539271.xls/BQ 5/13
Project:
6
Description
qty
Unit
1 A
Bakau Piles 2.0m to 4.50m
500
no
B
RC Piles Mob & demob piling rig
C
150 x 150 RC piles
1
itm
7,600
m
rate
amount
-
-
-
6
2 A
B
PDA test
Temporary protection to services pipes etc
2
no
1
itm
-
-
-
C
D
E
Grade 30 conc & rebar etc in permanent protection to services
Structural steel in ditto
Sand filling
10
500
50
m3
kg
m3
-
-
-
-
-
-
-
3
A
B
25mm dia alum rungs
Footpath & Road Re-construction 100mm thk footpath
150
100
no
-
-
m2
-
m3 m3 m3 m2 m2 m2
-
item
-
-
-
-
100mm RC G35 H/C Lean Conc 50mm thk BRC A5 Tactile tiles at ramps (10%) Labour trowell smooth
C
D
E
F
Road marking
Temporary crossing Temporary pedestrain footrpath
Free-flow water in drain by pumps etc
removal of abandon services Making good works affected
10/22/2008
10 10 5 100 10 100
1
3 3
1
1 1
item item
item
item item
-
-
-
9539271.xls/BQ 6/14
4
A
B
H
Demolish extg footpath Diposal Backfill
E.O excavation for ROCK
Backfill with approved imported material
1
item item item
10
m3
50
m3
-
-
-
-
-
I
5
A
B
C
D
C
6 A
B
C
D
E
F
7
A
B
Close turfing 'Cow Grass"
Allow for protection of extg trees
Cut trees - 600 to 900mm girth
Transplanting of tree
Maintenance of trees
Supply & lay cement dust
Drain Reconstruction Supply & install 850 x 1000 HD Veh grating
Box out for ditto
Regrade extg drains
Demolish extg scupper drains etc
Trial pits & trenchs
Soil investigation
Re-connect extg drains etc to new box drains & culverts
All for difficulty in connection, demolition etc
10/22/2008
670
m2
1 item
3
2
no
no
18 mth
10 m3
9
9
50
no
no
m
1 item
1 item
-
1 item
-
1 item
-
1 item
-
-
-
-
-
-
-
-
-
-
-
-
-
9539271.xls/BQ 6/15
C
D
E
8 A B C D E F G H I J
Protect all extg services rtc
INSTRUMENTS & MONITORING Inclinometer Vibrating Wire Piezometer Vibrating Wire Strain Gauge Ground Settlement Point Water Standpipe Crack Meter Tiltmeter Handheld noise meter Noise Meter Vibration Monitoring during construction
-
item
-
no no no no no no no no no mth
-
1 item
Comply with IDA requirement
Allow for ped & veh access to bldgs etc
-
1 item
5
25 15 60 300 15 100 15 2 5 18
-
-
-
9
Erosion & Silt Control
A
Allow for measures to prevent silt from being wash into drains & cannals
1 item
-
B B C
E
ECM QECP ECM Plan Sediment Control Plan
1 item 1 item 1 item
15,000.00 15,000.00 15,000.00 -
Perimeter cut-off drain C7
300
m
Excavate Diposal Backfilling on completion Turfing on completion C7 pc channel Bakau roller Sand bedding 75 mm G25 side wall BRC A5
215 215 215 300 300 600 81 23 300
m3 m3 m3 m2 m m m3 m3 m2
-
Perimeter cut-off drain C7A
300
m
-
Excavate Diposal Backfilling on completion Turfing on completion C7A pc channel
215 215 215 300 300
m3 m3 m3 m2 m
-
45,000.00
-
F
-
10/22/2008
9539271.xls/BQ 6/16
Bakau roller Sand bedding 75 mm G25 side wall BRC A5
600 m 81 m3 23 m3 300 m2
45,000.00
10 A Geotextile silt fence
1,000
m
-
950 m2 667 no 40 m3 1,500 m
-
Geotextile silt fence material 2 x 2" timber post x 1.0m long HC backfilling Allow for labor
B
Silt treatment System
2
no
C
Turbidity meter
1 item
D
Allow for sampling & testing at discharge point
18 mth
-
E
Other ECM meassures
1 item
F
CCTV recording system
5
no
-
11 A 2.10m high Hoarding
80 m2
B
Artwork on hoarding
2 panel
C
Temp pumping system with auto sensors etc , submersible pump etc Sump pump electrical works piping works Gen Set rental & fuel Sump
1 item
D
E
Maintenace of pumping system
Remove on completion , temp pumping system
1 no 1 sum 197 m 6 mth 1 no
6 mth
1 item
-
-
-
-
-
-
-
-
-
12 A Allow for other expenses
B
Others
10/22/2008
9539271.xls/BQ 6/17
45,000.00
10/22/2008
45,000.00
9539271.xls/BQ 6/18
0
10/22/2008
9539271.xls/BQ 6/19
10/22/2008
9539271.xls/BQ 6/20
Monitoring
18
-
#DIV/0!
mth
800.00
-
14,400.00
-
150
15
160 10 290 15 40
10/22/2008
9539271.xls/BQ 6/21
680
10/22/2008
9539271.xls/BQ 6/22
10/22/2008
9539271.xls/BQ 6/23
Project: Description
2 A
ROADWORKS Setting out and general site clearance
B
9.9 metre wide road including base courses and wearing course
qty
290
Unit
rate
9.9
2,871.00
290 flexible pavement Type 1 excavation & disposal 300mm thk sub-base 250mm thk granite aggregate 120mm thk base course 50mm thk wearing course
2,871 2,068 862 718 2,871 2,871
amount
2,871.00 m2 m3 m3 m3 m2 m2
F.O.R 20.00 49.00 106.00 27.00 11.00
41,360.00 42,238.00 76,108.00 77,517.00 31,581.00
50/m3 110/m3 105/m3 10.6/m2
300mm thk sub-base 250mm thk granite aggregate 120mm thk base course 50mm thk wearing course
268,804.00
C
Road kerbs including concrete foundation, etc
580
m
68.00
39,440.00 39,440.00
Road markings
580
m
4.00
2,320.00 2,320.00
310,564.00
10/22/2008
9539271.xls/Road Works/24
300 250 120 50 720
D
E
F
250 mm diameter (outside diameter) UPVC pipes excavation lean concrete G15 haunching G25
Drop inlet chambers including gratings, etc
Tree aeration troughs Excavate 19mm graded stone Geotextile PC sump c/w cleaning eye etc
708
m
21.21
15,030.00
708
m3
20.00
14,170.00
14 35
m3 m3
156.00 161.00
2,220.00 5,710.00 28,980.00 -
161
150 1,020 360 1,920 150
no
no m3 m3 m2 no
180.00
20.00 103.40 5.00 150.00
37,130.00
28,980.00
20,400.00 37,230.00 9,600.00 22,500.00 89,730.00
G
Concrete pavements/footpath
H
LTA standard road name plates and traffic schemes directional signs and road/traffic markings 8.1 road marking 100mm wide line type C 100mm wide line type B 150mm wide line 200mm wide line Type M 200mm wide line Type N 450mm wide line Type N single arrow double arrow 7.2 traffic sign
160 70 516 75 72 100 13 28 5
m m m m m m no no no
1.60 1.60 2.40 3.00 3.00 6.50 38.00 60.00 225.00
260.00 120.00 1,240.00 230.00 220.00 650.00 500.00 1,680.00 1,130.00 6,030.00
I
Rigid Pavement Semi-Rigid pavement at junction
excavation & disposal 300mm thk granite aggregate class A geotextile 225mm thk G35 concrete BRC B8 120mm thk base course 50mm thk wearing course
4 800 60
no m2 m2
864
m2
520 259 864 194 890 864 864
m3 m3 m2 m3 m2 m2 m2
20.00 105.80 5.00 166.00 6.70 27.00 11.30
10,400.00 27,430.00 4,320.00 32,280.00 5,970.00 23,330.00 9,770.00 113,500.00
J
Make good connection between new & existing road
K
Vehicular impact guard rails VIG End piece Post
10/22/2008
2
78 2 39
no
m no no
1,500.00
68.00 90.00 120.00
3,000.00 5,310.00 180.00 4,680.00 -
3,000.00
10,170.00
9539271.xls/Road Works/25
Project: Description
5
qty
Unit
rate
amount
FOOTPATH Concrete footpaths including finishes and connection to existing 125 x 2m wide
5.1 footpath 150mm thk G30 concrete 50mm thk unwash sand BRC A5 formwork
250
250 38 13 250 38
m2 m2 m2 m2 m2
163.00 49.00 1.90 34.20
6,120.00 620.00 480.00 1,290.00 8,510.00
5.2 Homogeneous tactile tiles
-
m2
60.00
-
8,510.00
10/22/2008
9539271.xls/Footpath/26
Project:
G40
G25
G15
Fwk
T10
T13
T16
T20
Note: Excavation, Deposal & Backfilling is calculated from top of Culvert Slab to base Earth works from existing Ground Levels to Top of Culvert Slab is taken separately in Earth works page 3-1 A culvert width depth length exca.
1.50 m 1.05 m 23.00 m 87.00 m3
100% 1.800
1500 x 1050mm culvert across Sims Ave Description no. width thk length Volume top (G40) 1 2.100 0.300 23.00 15.00 wall (G40) 2 0.300 1.100 23.00 16.00 spray (G40) 2 0.5 0.200 0.200 23.00 1.00 cobel (G40) 2 0.250 0.375 23.00 5.00 Total 37.0 base (G40) 1 2.700 0.300 23.00 19.00 spray (G40) 2 0.5 0.200 0.200 23.00 1.00 Total 20.0 M.C. (G25) 2 0.600 0.200 23.00 6.00 L.C. (G15) 1 3.300 0.050 23.00 4.00 Side H.C 2 0.300 0.600 23.00 9.00 base H.C. 1 3.300 0.150 23.00 12.00 formwork wall top base 75mm weepholes geocomposite
culvert
c h lap
Tt Tb t/b W0 W I Wh
lap B t/b Bh lap L lap
spray cobel w
T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20
2 2 1 2
23.00 23.00 23.00 23.00
1.400 1.100 1.500 0.300 Total 23.00 1.000 23.00 1.000
2 2 No. 1 1 2 44 2 2 4 48 2 2 56 4 2 8 2
No. Spac'g Length 231 0.100 3.000 231 0.100 2.500 22 0.100 23.500 1 12.000 1.100 231 0.100 2.225 231 0.100 2.100 12 0.100 23.600 1 12.000 1.100 231 0.100 2.900 28 0.100 23.400 1 12.000 1.100 231 0.100 1.375 4 23.200 1 12.000 1.100 231 0.100 1.650
65.0 51.0 35.0 14.0 151.0 46.0 46.0 mass 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 Total
Expansion joint 13mm flexcell
13 x 50mm sealant
top base wall
2 2 2
1 1 2
top base wall
2 2 2
1 1 2
2.10 2.70 1.10
0.200 0.200 0.200 Total 2.00 2.100 2.00 2.700 2.00 1.100 Total
T10-T20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.00
0.8 1.1 0.9 2.8 8.4 10.8 8.8 28.0
9539271.xls/culvert/27
Qty
Unit Rate m3 20.00 m3 183.30 m3 105.80 m3 32.00
Amount
Exca. & dispose Quarry Dust Backfill base H.C. Lean G15
12 4
concrete G40 base formwork
20 14
m3 m2
32.00 34.20
640.00 478.80
37 137
m3 m2
32.00 34.20
1,184.00 4,685.40
Concrete G40 wall & top formwork
1,269.60 128.00
4 20 1,118.80
14 37
137
4,685.40 mass G25 T20
6 -
m3 kg
32.00 1.30
13mm flexcell board 13mm x 50mm joint sealant
3 28
m2 m
60.00 30.00
Side H/C 75mm pvc weephole geomposite membrane
9 46 46
m3 no no
105.80 1.00 5.00
192.00 180.00 840.00 952.20 46.00 230.00
6 -
$10,826.00 page approach slab width depth length exca.
470.7
location for 1500 x 1050mm culvert across Sims Ave Description no. width thk area Volume 3.000 m slab (G40) 2 1 3.000 0.250 1.50 34.50 0.25 m 23.00 m graded stone 2 1 2.750 0.250 1.38 31.63 73.03 m3 50mm lean conc 2 1 3.000 0.050 0.30 6.90 formwork
approach slab
C
T,B key
L lap
2 2
T 13 T 13 T 13 T 13
No. 2 0 2 32
0.25 0.25
23.000 3.000 total
No. Spac'g Length 116 0.200 3.500 116 0.200 1.150 16 0.200 23.000 2 12.000 0.700
11.50 1.50 13.00 mass 1.042 1.042 1.042 1.042
73.03 0
Total 8mm thk neoprene pad 2 layer bldg paper T16 galv. bar (1000 long)
Qty 116 72 35 32 7 13 46 46 310
Exca. & dispose Backfill with quarry waste concrete G40 T10-T20 Graded stone G15 lean conc formwork 8mm thk neoprene pad 2 layer bldg paper T16 galv. bar (1000 long)
2 2 2
1 1 155
Unit Rate m3 20.00 m3 183.30 m3 32.00 kg 1.30 m3 105.80 m3 32.00 m2 34.20 m 40.00 m 10.00 no 7.00
T10-T20 0.00 0.00 0.00 0.00 0.00
23.00 23.00 0.150
46 46 310
0.00 m m no.
Amount 2,318.40 13,280.09 1,120.00 3,385.60 224.00 444.60 1,840.00 460.00 2,170.00 $25,242.69
page 3-1 culvert width depth length exca.
1.50 m 1.40 m 12.00 m 54.00 m3
100% 2.150
1500 x 1400mm box culvert Description no. width thk length Volume top (G40) 1 2.100 0.300 12.00 8.00 wall (G40) 2 0.300 1.450 12.00 11.00 spray (G40) 2 0.5 0.200 0.200 12.00 1.00 cobel (G40) 2 0.250 0.375 12.00 3.00 Total 23.0 base (G40) 1 2.700 0.400 12.00 13.00 spray (G40) 2 0.5 0.200 0.200 12.00 1.00 Total 14.0 M.C. (G25) 2 0.600 0.200 12.00 3.00 L.C. (G15) 1 3.300 0.050 12.00 2.00 Side H.C 2 0.300 0.950 12.00 7.00 base H.C. 1 3.300 0.150 12.00 6.00 formwork wall top base 75mm weepholes geocomposite
culvert
c h lap
Tt Tb t/b W0 W I Wh
lap B t/b Bh lap L lap
spray cobel w
T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20
2 2 1 2
12.00 12.00 12.00 12.00
1.750 1.450 1.500 0.400 Total 12.00 1.000 12.00 1.000
2 2 No. 1 1 2 44 2 2 4 64 2 2 56 4 2 8 2
No. Spac'g Length 121 0.100 3.000 121 0.100 2.500 22 0.100 12.500 1 12.000 1.100 121 0.100 2.675 121 0.100 2.550 16 0.100 12.600 1 12.000 1.100 121 0.100 3.100 28 0.100 12.600 1 12.000 1.100 121 0.100 1.375 4 12.200 1 12.000 1.100 121 0.100 1.650
42.0 35.0 18.0 10.0 95.0 24.0 24.0 mass 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 Total
Expansion joint 13mm flexcell
top base wall
2 2 2
1 1 2
2.10 2.70 1.45
0.200 0.300 0.200
T10-T20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.00
0.8 1.6 1.2 9539271.xls/culvert/28
13 x 50mm sealant
top base wall
2 2 2
1 1 2
2.00 2.00 2.00
Total 2.100 2.700 1.450 Total
3.6 8.4 10.8 11.6 30.8
9539271.xls/culvert/29
Qty
Unit Rate m3 20.00 m3 183.30 m3 105.80 m3 32.00
Amount
Exca. & dispose Quarry Dust Backfill base H.C. Lean G15
634.80 64.00
6 2
concrete G40 base formwork
14 10
m3 m2
32.00 34.20
448.00 342.00
Concrete G40 wall & top formwork
23 85
m3 m2
32.00 34.20
736.00 2,907.00
2 14
10
790.00 23 85 2,907.00
mass G25 T10-T20
3 -
m3 kg
32.00 1.30
13mm flexcell board 13mm x 50mm joint sealant
4 31
m2 m
60.00 30.00
Side H/C 75mm pvc weephole geomposite membrane
7 24 24
m3 no no
105.80 1.00 5.00
96.00 240.00 930.00 740.60 24.00 120.00
3 -
$7,282.40 approach slab width depth length exca.
Description 3.000 m slab (G40) 0.25 m 12.00 m graded stone 38.10 m3 50mm lean conc
no.
formwork
approach slab
C
T,B key
L lap
width thk area Volume 3.000 0.250 1.50 18.00
2
1
2
1
2.750
0.250
1.38
16.50
2
1
3.000
0.050
0.30
3.60
0.25 0.25
12.000 3.000 total
6.00 1.50 7.50
38.10
2 2
T 13 T 13 T 13 T 13
No. 2 0 2 32
No. Spac'g Length 61 0.200 3.500 61 0.200 1.150 16 0.200 12.000 1 12.000 0.700
mass 1.042 1.042 1.042 1.042
0
Total 8mm thk neoprene pad 2 layer bldg paper T16 galv. bar (1000 long)
Qty Exca. & dispose Backfill with quarry waste concrete G40 T10-T20 Graded stone G15 lean conc formwork 8mm thk neoprene pad 2 layer bldg paper T16 galv. bar (1000 long)
86 54 18 17 4 8 24 24 162
606.87
2 2 2
1 1 81
Unit Rate m3 20.00 m3 183.30 m3 32.00 kg 1.30 m3 105.80 m3 m2 34.20 m 40.00 m 10.00 no 7.00
T10-T20 0.00 0.00 0.00 0.00 0.00
12.00 12.00 0.150
24 24 162
0.00 m m no.
Amount 1,728.00 9,898.20 576.00 1,798.60 273.60 960.00 240.00 1,134.00 $16,608.40
page 3-2 culvert width depth length exca.
1.80 m 1.60 m 46.00 m 259.00 m3
1800 x 1600mm culvert Description no. top (G40) wall (G40) spray (G40) cobel (G40)
1 2 2 2
base spray
(G40) (G40)
1 2
M.C. (G25) L.C. (G15) Side H.C base H.C.
2 1 2 1
formwork wall
2 2 1 2
100% 2.350
top base 75mm weepholes geocomposite
culvert
c h lap
Tt Tb t/b W0 W I Wh
lap B t/b Bh lap L lap
spray cobel w
T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20
width thk length Volume 2.400 0.300 46.00 34.00 0.300 1.650 46.00 46.00 0.5 0.200 0.200 46.00 2.00 0.250 0.375 46.00 9.00 Total 91.0 3.000 0.400 46.00 56.00 0.5 0.200 0.200 46.00 2.00 Total 58.0 0.750 0.200 46.00 14.00 3.600 0.050 46.00 9.00 0.300 1.150 46.00 32.00 3.600 0.150 46.00 25.00 46.00 46.00 46.00 46.00
1.950 1.650 1.800 0.400 Total 46.00 1.000 46.00 1.000
2 2 No. 1 1 2 50 2 2 4 72 2 2 62 4 2 8 2
No. Spac'g Length 461 0.100 3.300 461 0.100 2.800 25 0.100 46.500 3 12.000 1.100 461 0.100 2.950 461 0.100 2.750 18 0.100 46.600 3 12.000 1.100 461 0.100 3.400 31 0.100 46.600 3 12.000 1.100 461 0.100 1.375 4 46.200 3 12.000 1.100 461 0.100 1.650
180.0 152.0 83.0 37.0 415.0 92.0 92.0 mass 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 Total
Expansion joint 13mm flexcell
top base wall
2 2 2
1 1 2
2.40 3.00 1.65
0.200 0.300 0.200 Total
T10-T20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.00
1.0 1.8 1.3 4.1 9539271.xls/culvert/30
13 x 50mm sealant
top base wall
2 2 2
Qty
1 1 2
Unit Rate m3 20.00 m3 183.30 m3 105.80 m3 32.00
2.00 2.00 2.00
2.400 3.000 1.650 Total
Amount
Exca. & dispose Quarry Dust Backfill base H.C. Lean G15
25 9
concrete G40 base formwork
58 37
m3 m2
32.00 34.20
1,856.00 1,265.40
91 378
m3 m2
32.00 34.20
2,912.00 12,927.60
Concrete G40 wall & top formwork
9.6 12.0 13.2 34.8
2,645.00 288.00
9 58 3,121.40
37 91 378
12,927.60 mass G25 T10-T20
14 -
m3 kg
32.00 1.30
13mm flexcell board 13mm x 50mm joint sealant
4 35
m2 m
60.00 30.00
Side H/C 75mm pvc weephole geomposite membrane
32 92 92
m3 no no
105.80 1.00 5.00
448.00 240.00 1,050.00 3,385.60 92.00 460.00
14 -
32 92
$27,569.60
page 3-3 culvert width depth length exca.
2.40 m 2.00 m 140.00 m 1155.00 m3
2400 x 2000 culvert Description no. top (G40) 1 wall (G40) 2 spray (G40) 2 cobel (G40) 2 base spray
(G40) (G40)
1 2
M.C. (G25) L.C. (G15) Side H.C base H.C.
2 1 2 1
formwork wall
2 2 1 2
100% 2.750
top base 75mm weepholes geocomposite
culvert
c h lap
Tt Tb t/b W0 W I Wh
lap B t/b Bh lap L lap
spray cobel w
T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20
width thk length Volume 3.000 0.300 140.00 126.00 0.300 2.050 140.00 173.00 0.5 0.200 0.200 140.00 6.00 0.250 0.375 140.00 27.00 Total 332.0 3.600 0.400 140.00 202.00 0.5 0.200 0.200 140.00 6.00 Total 208.0 1.050 0.200 140.00 59.00 4.200 0.050 140.00 30.00 0.300 1.550 140.00 131.00 4.200 0.150 140.00 89.00 140.00 140.00 140.00 140.00
2.350 2.050 2.400 0.400 Total 140.00 2.000 140.00 2.000
2 2 No. 1 1 2 62 2 2 4 88 2 2 74 4 2 8 2
No. Spac'g 1401 0.100 1401 0.100 31 0.100 11 12.000 1401 0.100 1401 0.100 22 0.100 11 12.000 1401 0.100 37 0.100 11 12.000 1401 0.100 4 11 12.000 1401 0.100
Length 3.900 3.400 140.500 1.100 3.500 3.150 140.600 1.100 4.000 140.600 1.100 1.375 140.200 1.100 1.650
658.0 574.0 336.0 112.0 1568.0 560.0 560.0 mass 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466
T10-T20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Expansion joint 13mm flexcell
13 x 50mm sealant
top base wall
2 2 2
1 1 2
top base wall
2 2 2
1 1 2
Qty
Unit Rate m3 20.00 m3 183.30 m3 105.80 m3 32.00
3.00 3.60 2.05
0.200 0.300 0.200 Total 2.00 3.000 2.00 3.600 2.00 2.050 Total
0.0
0.00
1.2 2.2 1.6 5.0 12.0 14.4 16.4 42.8
Amount
Exca. & dispose Quarry Dust Backfill base H.C. Lean G15
89 30
concrete G40 base formwork
208 112
m3 m2
32.00 34.20
6,656.00 3,830.40
332 1,456
m3 m2
32.00 34.20
10,624.00 49,795.20
mass G25 T10-T20
59 -
m3 kg
32.00 1.30
13mm flexcell board 13mm x 50mm joint sealant
5 43
m2 m
60.00 30.00
131 560 560
m3 no no
105.80 1.00 5.00
1,888.00 300.00 1,290.00 13,859.80 560.00 2,800.00
Concrete G40 wall & top formwork
599.34
9,416.20 960.00
10,486.40
49,795.20
Side H/C 75mm pvc weephole geomposite membrane
$101,979.60 page approach slab
location Description
for 2400 x 2000m culvert no. width thk
area
728.43
Volume 9539271.xls/culvert/31
width depth length exca.
3.000 m slab (G40) 0.25 m 37.00 m graded stone 117.48 m3 50mm lean conc formwork
approach slab
C
T,B key
L lap
2
1
3.000
0.250
1.50
55.50
2
1
2.750
0.250
1.38
50.88
2
1
3.000
0.050
0.30
11.10
0.25 0.25
37.000 3.000 total
18.50 1.50 20.00
117.48
2 2
T 13 T 13 T 13 T 13
No. 2 0 2 32
No. Spac'g Length 186 0.200 3.500 186 0.200 1.150 16 0.200 37.000 3 12.000 0.700
mass 1.042 1.042 1.042 1.042
0
Total 8mm thk neoprene pad 2 layer bldg paper T16 galv. bar (1000 long)
Exca. & dispose Backfill with quarry waste concrete G40 T10-T20 Graded stone G15 lean conc formwork 8mm thk neoprene pad 2 layer bldg paper T16 galv. bar (1000 long)
Qty 340 222 56 51 11 20 74 74 496
2 2 2
1 1 248
Unit Rate m3 20.00 m3 183.30 m3 32.00 kg 1.30 m3 105.80 m3 32.00 m2 34.20 m 40.00 m 10.00 no 7.00
37.00 37.00 0.150
T10-T20 0.00 0.00 0.00 0.00 0.00 74 74 496
0.00 m m no.
Amount 6,800.00 40,692.60 1,792.00 5,395.80 352.00 684.00 2,960.00 740.00 3,472.00 $62,888.40
243
55
107
661
0
0
0
9539271.xls/culvert/32
0
cast in-situ Box Drain width depth length exca.
location1800 x 1600mm box drain Description no. 1.80 m top (G40) 1 1.60 m wall (G40) 2 151.00 m spray (G40) 2 3 852.00 m cobel (G40) 0 base spray
(G40) (G40)
1 2
M.C. (G25) L.C. (G15) Side H.C base H.C.
2 1 2 1
formwork wall
2 2 1 2
100% 2.350
top base 75mm weepholes geocomposite
Box Drain
c
Tt Tb t/b
h lap
W0 W I Wh lap B t/b Bh lap spray cobel
L lap
w
T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20 T 20
A-C width thk length Volume 2.400 0.300 151.00 109.00 0.300 1.650 151.00 150.00 0.5 0.200 0.200 151.00 7.00 0.250 0.375 151.00 0.00 Total 266.0 3.000 0.300 151.00 136.00 0.5 0.200 0.200 151.00 7.00 Total 143.0 0.750 0.200 151.00 46.00 3.600 0.050 151.00 28.00 0.300 1.150 151.00 105.00 3.600 0.150 151.00 82.00 151.00 151.00 151.00 151.00
1.950 1.650 1.800 0.300 Total 151.00 1.000 151.00 1.000
2 2 No. 1 1 2 50 2 2 4 72 2 2 62 4 2 8 2
No. Spac'g 1511 0.100 1511 0.100 25 0.100 12 12.000 1511 0.100 1511 0.100 18 0.100 12 12.000 1511 0.100 31 0.100 12 12.000 1511 0.100 4 12 12.000 1511 0.100
Length 3.300 2.800 151.500 1.100 2.850 2.650 151.600 1.100 3.200 151.400 1.100 1.375 151.200 1.100 1.650
589.0 499.0 272.0 91.0 1360.0 302.0 302.0 mass 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 2.466 Total
Expansion joint 13mm flexcell
13 x 50mm sealant
top base wall
2 2 2
1 1 2
top base wall
2 2 2
1 1 2
2.40 3.00 1.65
0.200 0.200 0.200 Total 2.00 2.400 2.00 3.000 2.00 1.650 Total
T10-T20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1.0 1.2 1.3 3.5 9.6 12.0 13.2 34.8
9539271.xls/drain/33
0.00
Qty 852 725 82 28
Exca. & dispose Quarry Dust Backfill base H.C. Lean G15 concrete G40 base formwork
Unit Rate m3 20.00 m3 183.30 m3 105.80 m3 32.00
Amount 17,040.00 132,855.84 8,675.60 896.00
143 91
m3 m2
32.00 34.20
4,576.00 3,112.20
266 1,269
m3 m2
32.00 34.20
8,512.00 43,399.80
mass G25 T20
46 -
m3 kg
32.00 1.30
13mm flexcell board 13mm x 50mm joint sealant
3 35
m2 m
60.00 30.00
105 302 302
m3 no no
105.80 1.00 5.00
1,472.00 180.00 1,050.00 11,109.00 302.00 1,510.00
Concrete G40 wall & top formwork
7,688.20
43,399.80
Side H/C 75mm pvc weephole geomposite membrane
$234,690.44
850 X 700 MM sump length 0.85 m width 0.70 m depth 1.00 m exca.
sump
location Description top (G40) L.wall (G40) W.wall (G40) base (G40)
ACCESS CHAMBERS no. width length depth Volume 0 1.200 1.350 0.200 0.00 2 1.350 0.250 1.000 0.68 2 1.200 0.250 1.000 0.60 0 1.200 1.350 0.200 0.00
0.00 m3 100%
800 L 800 L 801 w 801 w 802 L,w
Total
1.28
L.C. (G15) base H.C.
0 0
1.200 1.200
1.350 1.350
0.050 0.150
formwork L.W W.W soffit
2 2 0
1.350 1.700 0.850
1.400 1.400 0.700 Total
3.78 4.76 0.00 8.54
v h v v h
T 16 T 13 T 16 T 16 T 13
No. 4 4 3 1 4
No. Spac'g Length 6 0.150 1.650 1 0.150 2.100 1 0.150 1.500 1 0.150 2.600 1 0.150 1.850
mass 1.579 1.042 1.579 1.579 1.042 Total
850x1000 ped grad'g Alum. Rung
1554.24
0 1
1 9
6.000 0.300
0.00 0.00
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 Total 9
no. no.
9539271.xls/drain/34
Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Qty 2 9
Unit
Rate m3 m3 m3 kg m3 m2 no no
9
Amount 64.00 307.80 180.00
32.00 32.00 1.30 49.00 34.20 20.00
$551.80
850 x 750 x 2.00 sump length 0.85 m width 0.70 m depth 2.00 m exca.
sump
location Description top (G40) L.wall (G40) W.wall (G40) base (G40)
ACCESS CHAMBERS no. width length depth Volume 0 1.200 1.350 0.200 0.00 2 1.350 0.250 2.000 1.35 2 1.200 0.250 2.000 1.20 0 1.200 1.350 0.200 0.00
0.00 m3 100%
800 L 800 L 801 w 801 w 802 L,w
Total
2.55
L.C. (G15) base H.C.
0 0
1.200 1.200
1.350 1.350
0.050 0.150
formwork L.W W.W soffit
2 2 0
1.350 1.700 0.850
2.400 2.400 0.700 Total
6.48 8.16 0.00 14.64
v h v v h
T 16 T 13 T 16 T 16 T 13
No. 4 4 3 1 4
No. Spac'g Length 6 0.150 2.650 1 0.150 2.100 1 0.150 2.500 1 0.150 3.600 1 0.150 1.850
mass 1.579 1.042 1.579 1.579 1.042 Total
850x1000 ped grad'g Alum. Rung
Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Qty 3 15 12
0 1
Unit
Rate m3 m3 m3 kg m3 m2 no no
32.00 32.00 1.30 49.00 34.20 20.00
1 12
0.00 0.00
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
12
no. no.
Amount 96.00 513.00 240.00 $849.00
9539271.xls/drain/35
1500 x 1500 x 1.00 sump length 1.50 m width 1.50 m depth 2.00 m exca.
sump
location Description top (G40) L.wall (G40) W.wall (G40) base (G40)
ACCESS CHAMBERS no. width length depth Volume 0 2.000 2.000 0.200 0.00 2 2.000 0.250 2.000 2.00 2 2.000 0.250 2.000 2.00 0 2.000 2.000 0.200 0.00
0.00 m3 100%
800 L 800 L 801 w 801 w 802 L,w
Total
4.00
L.C. (G15) base H.C.
0 0
2.000 2.000
2.000 2.000
0.050 0.150
formwork L.W W.W soffit
2 2 0
2.000 2.500 1.500
2.400 2.400 1.500 Total
9.60 12.00 0.00 21.60
v h v v h
T 16 T 13 T 16 T 16 T 13
No. 4 4 3 1 4
No. Spac'g Length 11 0.150 2.650 1 0.150 2.900 1 0.150 2.500 1 0.150 3.600 1 0.150 2.500
mass 1.579 1.042 1.579 1.579 1.042 Total
850x1000 ped grad'g Alum. Rung
Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Qty 4 22
0 1
Unit
12
1 12
Rate m3 m3 m3 kg m3 m2 no no
32.00 32.00 1.30 49.00 34.20 20.00
0.00 0.00
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
12
no. no.
Amount 128.00 752.40 240.00 $1,120.40
1500 x 1500 x 2.00 sump length 1.50 m width 1.50 m depth 2.00 m exca.
location Description top (G40) L.wall (G40) W.wall (G40) base (G40)
ACCESS CHAMBERS no. width length depth Volume 0 2.000 2.000 0.200 0.00 2 2.000 0.250 2.000 2.00 2 2.000 0.250 2.000 2.00 0 2.000 2.000 0.200 0.00
0.00 m3 100%
Total
4.00
L.C. (G15) base H.C.
0 0
2.000 2.000
2.000 2.000
0.050 0.150
formwork L.W W.W soffit
2 2 0
2.000 2.500 1.500
2.400 2.400 1.500 Total
9.60 12.00 0.00 21.60
0.00 0.00
9539271.xls/drain/36
sump
800 L 800 L 801 w 801 w 802 L,w
v h v v h
T 16 T 13 T 16 T 16 T 13
No. 4 4 3 1 4
No. Spac'g Length 11 0.150 2.650 1 0.150 2.900 1 0.150 2.500 1 0.150 3.600 1 0.150 2.500
mass 1.579 1.042 1.579 1.579 1.042 Total
850x1000 ped grad'g Alum. Rung
Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Qty 4 22 12
0 1
Unit
Rate m3 m3 m3 kg m3 m2 no no
32.00 32.00 1.30 49.00 34.20 20.00
1 12
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
12
no. no.
Amount 128.00 752.40 240.00 $1,120.40
9539271.xls/drain/37
Project:
sump length width depth exca.
sump
2.10 m 1.00 m 2.50 m
location 2.5 x 2.5m sump Description no. top (G40) 1 L.wall (G40) 2 W.wall (G40) 2 base (G40) 1
width 1.600 2.700 1.000 1.600
14.26 m3 100%
T & bb b wall v v h h SPLAY t t
length depth 2.700 0.300 0.300 2.700
0.300 2.500 2.500 0.300
Total
8.15
L.C. (G15) base H.C.
1 1
1.600 1.600
2.700 2.700
0.050 0.150
formwork L.W W.W c soffit
2 2 2 1
3.100 4.300 1.850 2.100
2.500 3.100 0.300 1.000 Total
15.50 26.66 1.11 2.10 45.37
T 16 T 13 T 16 T 16 T 13 T 13 T 16 T 16
1-1
1-1 1-1
No. 4 4 4 4 4 4 2 2
No. 6 12 6 12 14 14 6 12
Spac'g Length 0.200 3.900 0.200 2.800 0.200 4.300 0.200 4.300 0.200 3.700 0.200 2.600 0.200 1.449 0.200 1.449
mass 1.579 1.042 1.579 1.579 1.042 1.042 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung Class B geotwxtile 50mm sand bed
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. Sand bed 50mm thk formwork 850x1000 ped grad'g Alum. Rung Class B geotextile
Volume 1.30 4.05 1.50 1.30
9 1 1 0.2 46 1 8 4
1 1 1 1
Unit Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m3 111.00 m2 34.20 no 170.00 no 20.00 m2 5.00
1 8 1 1
6.000 0.300 1.600 1.600
2.700 2.700
0.22 0.65
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 1 8 4.32 0.22
0.05
no. no. m2 m3
Amount 2,007.00 150.00 82.30 23.98 1,573.20 170.00 160.00 21.60 $4,188.08
$4,188.00
9539271.xls/sump/38
sump length width depth exca.
sump
1.00 m 1.00 m 1.74 m
location ch 310 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
4.58 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 1.400 0.200 0.200 1.400
0.200 1.735 1.735 0.200
Total
2.44
L.C. (G15) base H.C.
1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
2.135 2.135 1.000 Total
5.98 5.98 1.00 12.96
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 11 11 21 19 11 11 11 11 4 4
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 2.735 0.100 3.000 0.100 5.270 0.100 5.270 0.100 2.400 0.100 2.000 3.000 3.000
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
700x850 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 700x850 ped grad'g Alum. Rung
Unit 5 3 1 1 13 1 5
1 1
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
1 5
Volume 0.39 0.97 0.69 0.39
6.000 0.300
0.10 0.29
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 1 no. 5 no.
Amount 100.00 669.00 150.00 82.30 444.60 260.00 100.00 $1,805.90 $1,805.90
$1,805.90
9539271.xls/sump/39
sump length width depth exca.
sump
1.00 m 1.00 m 1.96 m
location ch 480 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
5.01 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 1.400 0.200 0.200 1.400
0.200 1.955 1.955 0.200
Total
2.65
L.C. (G15) base H.C.
1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
2.355 2.355 1.000 Total
6.59 6.59 1.00 14.18
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 11 11 21 21 11 11 11 11 4 4
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 2.955 0.100 3.000 0.100 5.710 0.100 5.710 0.100 2.400 0.100 2.000 3.000 3.000
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 6 3 1 1 15 1 6
1 1
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
1 6
Volume 0.39 1.09 0.78 0.39
6.000 0.300
0.10 0.29
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 1 no. 6 no.
Amount 120.00 669.00 150.00 82.30 513.00 260.00 120.00 $1,914.30 $1,914.30
$1,914.30
9539271.xls/sump/40
sump length width depth exca.
sump
1.00 m 1.00 m 2.00 m
location ch 480 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
5.10 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 1.400 0.200 0.200 1.400
0.200 2.003 2.003 0.200
Total
2.70
L.C. (G15) base H.C.
1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
2.403 2.403 1.000 Total
6.73 6.73 1.00 14.46
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 11 11 21 22 11 11 11 11 4 4
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 3.003 0.100 3.000 0.100 5.806 0.100 5.806 0.100 2.400 0.100 2.000 3.000 3.000
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 6 3 1 1 15 1 6
1 1
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
1 6
Volume 0.39 1.12 0.80 0.39
6.000 0.300
0.10 0.29
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 1 no. 6 no.
Amount 120.00 669.00 150.00 82.30 513.00 260.00 120.00 $1,914.30 $1,914.30
$1,914.30
9539271.xls/sump/41
sump length width depth exca.
sump
1.00 m 1.00 m 1.72 m
location ch 550 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
4.55 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 1.400 0.200 0.200 1.400
0.200 1.720 1.720 0.200
Total
2.43
L.C. (G15) base H.C.
1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
2.120 2.120 1.000 Total
5.94 5.94 1.00 12.88
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 11 11 21 19 11 11 11 11 4 4
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 2.720 0.100 3.000 0.100 5.240 0.100 5.240 0.100 2.400 0.100 2.000 3.000 3.000
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 5 3 1 1 13 1 5
1 1
1 5
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
Volume 0.39 0.96 0.69 0.39
0.10 0.29
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
1 no. 5 no.
Amount 100.00 669.00 150.00 82.30 444.60 260.00 100.00 $1,805.90 $1,805.90
sump length width depth
1.00 m 1.00 m 0.89 m
exca.
2.92 m3
location ch 900 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
length depth 1.400 0.200 0.200 1.400
0.200 0.890 0.890 0.200
$1,805.90
Volume 0.39 0.50 0.36 0.39
9539271.xls/sump/42
100%
sump
Total
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
1.64
L.C. (G15) base H.C.
1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
1.290 1.290 1.000 Total
3.61 3.61 1.00 8.22
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 11 11 21 10 11 11 11 11 4 4
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 1.890 0.100 3.000 0.100 3.580 0.100 3.580 0.100 2.400 0.100 2.000 3.000 3.000
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 3 2 1 1 9 1 2
1 1
1 2
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
0.10 0.29
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
1 no. 2 no.
Amount 60.00 446.00 150.00 82.30 307.80 260.00 40.00 $1,346.10 $1,346.10
sump length width depth exca.
1.00 m 1.00 m 0.84 m
location ch 915 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
2.83 m3 100%
length depth 1.400 0.200 0.200 1.400
0.200 0.845 0.845 0.200
Total
$1,346.10
Volume 0.39 0.47 0.34 0.39 1.59
L.C. (G15) base H.C.
1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
1.245 1.245 1.000 Total
3.49 3.49 1.00 7.98
0.10 0.29
9539271.xls/sump/43
sump
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 11 11 21 10 11 11 11 11 4 4
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 1.845 0.100 3.000 0.100 3.490 0.100 3.490 0.100 2.400 0.100 2.000 3.000 3.000
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 3 2 1 1 8 1 2
1 1
1 2
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
1 no. 2 no.
Amount 60.00 446.00 150.00 82.30 273.60 260.00 40.00 $1,311.90 $1,311.90
sump length width depth exca.
sump
1.00 m 1.00 m 1.06 m
location ch 990 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.400 1.000 1.400
3.26 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L
length depth 1.400 0.200 0.200 1.400
0.200 1.062 1.062 0.200
Total 1 1
1.400 1.400
1.400 1.400
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.400 1.400 1.000
1.462 1.462 1.000 Total
4.09 4.09 1.00 9.18
T 10 T 10 T 10 T 10 T 10 T 10 T 10
No. 1 1 1 1 2 2 1
No. 11 11 11 11 21 12 11
Spac'g Length 0.100 2.100 0.100 1.800 0.100 2.100 0.100 1.800 0.100 2.062 0.100 3.000 0.100 3.924
Volume 0.39 0.59 0.42 0.39 1.79
L.C. (G15) base H.C.
Tt Tb Tt Tb Wi W We-Bb
$1,311.90
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616
0.10 0.29
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9539271.xls/sump/44
802 w 800 L 801 w
We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 16 T 16
1 1 1 1 1
11 11 11 4 4
0.100 0.100 0.100
3.924 2.400 2.000 3.000 3.000
0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 4 2 1 1 10 1 3
1 1
1 3
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
0.00 0.00 0.00 0.00 0.00 0.00 Total
6.000 0.300
1 no. 3 no.
Amount 80.00 446.00 150.00 82.30 342.00 260.00 60.00 $1,420.30 $1,420.30
$1,420.30 $15,706.70
sump length width depth exca.
sump
1.50 m 1.00 m 2.04 m
location CH 180 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.400 1.900 1.000 1.400
7.03 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 1.900 0.200 0.200 1.900
0.200 2.041 2.041 0.200
Total
3.43
L.C. (G15) base H.C.
1 1
1.400 1.400
1.900 1.900
0.050 0.150
formwork L.W W.W soffit
2 2 1
1.900 1.400 1.500
2.441 2.441 1.000 Total
9.28 6.83 1.50 17.61
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 11 11 16 16 26 22 11 16 11 16 4 4
Spac'g Length 0.100 2.600 0.100 2.300 0.100 2.100 0.100 1.800 0.100 3.041 0.100 3.500 0.100 6.382 0.100 5.882 0.100 2.900 0.100 2.000 3.500 3.000
Volume 0.53 1.55 0.82 0.53
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
0.13 0.40
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total
9539271.xls/sump/45
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 8 4 1 1 18 1 6
1 1
1 6
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
6.000 0.300
1 no. 6 no.
Amount 160.00 892.00 150.00 82.30 615.60 260.00 120.00 $2,279.90 $2,279.90
sump length width depth exca.
sump
1.80 m 0.60 m 2.13 m
location CH 700 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
1.000 2.200 0.600 1.000
6.00 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 2.200 0.200 0.200 2.200 Total
L.C. (G15) base H.C.
1 1
1.000 1.000
2.200 2.200
0.050 0.150
formwork L.W W.W soffit
2 2 1
2.200 1.000 1.800
2.526 2.526 0.600 Total
11.11 5.05 1.08 17.24
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 7 7 19 19 25 23 7 19 7 19 4 4
Spac'g Length 0.100 2.900 0.100 2.600 0.100 1.700 0.100 1.400 0.100 3.126 0.100 3.400 0.100 6.852 0.100 5.652 0.100 3.200 0.100 1.600 3.800 2.600
850x1000 ped grad'g Alum. Rung
Qty
Unit 6 4 1 1
1 1
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30
1 7
6.000 0.300
Volume 0.44 1.87 0.51 0.44 3.26
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
Exca. & dispose concrete G40 Lean G15 T10-20 base H.C.
0.200 2.126 2.126 0.200
$2,279.90
0.11 0.33
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 1 no. 7 no.
Amount 120.00 892.00 150.00 82.30 9539271.xls/sump/46
formwork 850x1000 ped grad'g Alum. Rung
18 1 7
m2 34.20 no 260.00 no 20.00
615.60 260.00 140.00 $2,259.90 $2,259.90
sump length width depth exca.
sump
2.20 m 2.20 m 3.47 m
location CH 1140 Description no. top (G40) L.wall (G40) W.wall (G40) base (G40)
width 1 2 2 1
2.600 2.600 2.200 2.600
27.53 m3 100%
800 L 800 L 801 w 801 w 802 L,w 803 link 802 L 802 w 800 L 801 w
length depth 2.600 0.200 0.200 2.600
0.200 3.472 3.472 0.200
Total 1 1
2.600 2.600
2.600 2.600
0.050 0.150
formwork L.W W.W soffit
2 2 1
2.600 2.600 2.200
3.872 3.872 2.200 Total
20.13 20.13 4.84 45.10
T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 10 T 16 T 16
No. 1 1 1 1 2 2 1 1 1 1 1 1
No. 23 23 23 23 45 36 23 23 23 23 4 4
Spac'g Length 0.100 3.300 0.100 3.000 0.100 3.300 0.100 3.000 0.100 4.472 0.100 5.400 0.100 9.944 0.100 9.944 0.100 3.600 0.100 3.200 4.200 4.200
mass 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 0.616 1.579 1.579 Total
850x1000 ped grad'g Alum. Rung
Qty Exca. & dispose concrete G40 Lean G15 T10-20 base H.C. formwork 850x1000 ped grad'g Alum. Rung
Unit 28 10 1 2 46 1 11
1 1
Rate m3 20.00 m3 223.00 m3 150.00 kg 1.20 m3 82.30 m2 34.20 no 260.00 no 20.00
1 11
Volume 1.35 3.61 3.06 1.35 9.37
L.C. (G15) base H.C.
Tt Tb Tt Tb Wi W We-Bb We-Bb Bt Bt L.openT W.openT
$2,259.90
6.000 0.300
0.34 1.01
T10-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 1 no. 11 no.
Amount 560.00 2,230.00 150.00 164.60 1,573.20 260.00 220.00 $5,157.80
$5,157.80
9539271.xls/sump/47
40 cast in-situ pipe 2.00 m dia 1 1.05 m H1 2.500 m W1 0.175
location MH 1 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 1.338 1.900 2.400
H 2.500 0.000 0.750
W Volume 0.175 1.84 0.800 0.00 0.00
dia 2 H2 W2
1.50 m 0.000 m 0.800 m
granolitic benching
1 3.14
1.900
2.300
0.56
caisson
8.000 m
Lean conc
0 3.14
2.400
0.050
0.00
1 3.143
8.000
4.100
0.350
36.09
1 3.14 2 3.14 0 3.14 1 3.143
1.425 1.900 1.900 8.000
2.500 0.000 0.750 4.100
0.175 0.800
11.20 0.00 0.00 103.10
exca. dispose
B.F.
1.84
243.83 m3 caisson (G35) 6.37 m3 237.46 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
114.30
2 C L C
wall lower cobel
L base
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
No. Spac'g Length 1 0.150 6.97 41 0.150 1.00 15 0.150 5.97 15 0.150 6.30 41 0.150 1.80 17 0.150 3.90
mass 2.466 2.466 6.313 6.313 2.466 2.466
rebar
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope
Qty 244 7 238 2 1 37 12 207 115 3 1 2 1 (1) 0 0 1 1
Unit Rate m3 20.00 m3 18.00 m3 18.00 m3 213.00 m3 200.00 m3 m3 213.00 kg 1.20 m2 m2 m2 m no no no no m m no no
Amount 4,880.00 126.00 4,284.00 426.00 200.00 7,881.00 -
0.0 0.0 0.0 0.0 0.0 0.0 0.0
2
1.05 m dia 1.05 m dia 610 mm dia 1.05 m dia 1.50 m dia
$17,797.00
cast in-situ pipe 2.00 m dia 1 1.80 m H1 10.500 m W1 0.175 dia 2 H2 W2
3.40 m 20.728 m 0.800 m
caisson
exca. dispose
B.F.
8.000 m
location MH HG -8 & -7 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
(same depth) H W Volume 10.500 0.175 12.06 20.728 0.800 198.06 0.750 0.00 210.12
granolitic benching
1 3.14
3.800
2.300
14.16
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
8.000
32.828
0.350
288.90
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 8.000
10.500 20.728 0.750 32.828
0.175 0.800
71.78 495.13 0.00 825.43
1,952.31 m3 caisson (G35) 460.81 m3 1,491.50 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
1392.34
2 C L C
wall lower cobel
L base
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
No. Spac'g Length 140 0.150 12.94 81 0.150 21.73 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.80
mass 2.466 2.466 6.313 6.313 2.466 2.466
rebar 0.0 0.0 0.0 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope
Qty 1,953 461 1,492 211 15 289 72 1,651 1,393 11 1 2 2 4 29 29 1 1
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no no m m no no
0.0
Amount -
211
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
$-
cast in-situ pipe 2.00 m dia 1 1.80 m H1 10.500 m W1 0.175 dia 2 H2 W2
3.40 m 17.355 m 0.800 m
caisson
exca. dispose
B.F.
8.000 m
location MH HG -6 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
H 10.500 17.355 0.750
W Volume 0.175 12.06 0.800 165.83 0.00 177.89
granolitic benching
1 3.14
3.800
2.300
14.16
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
8.000
29.455
0.350
259.22
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 8.000
10.500 17.355 0.750 29.455
0.175 0.800
71.78 414.56 0.00 740.62
1,751.71 m3 caisson (G35) 394.56 m3 1,357.15 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
1226.96
2 C L C
wall lower cobel
L base
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
No. Spac'g Length 117 0.150 12.94 81 0.150 18.36 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.80
mass 2.466 2.466 6.313 6.313 2.466 2.466
rebar
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope
Qty 1,752 395 1,358 178 15 260 72 1,482 1,227 11 1 2 2 3 26 26 1 1
Unit Rate Amount m3 25.00 43,800.00 m3 25.00 9,875.00 m3 10.00 13,580.00 m3 95.00 16,910.00 m3 90.00 1,350.00 m3 m3 92.00 23,920.00 kg 1.00 m2 6.30 453.60 m2 10.50 15,561.00 m2 24.00 29,448.00 m 580.00 6,090.00 no 910.00 910.00 no 1,400.00 2,800.00 no 950.00 1,900.00 no 1,200.00 3,600.00 m 50.00 1,277.75 m 85.00 2,172.18 no 185.00 185.00 no 414.00 414.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0
178
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
$174,246.53
cast in-situ pipe 2.00 m dia 1 1.80 m H1 5.275 m W1 0.175 dia 2 H2 W2
3.40 m 16.512 m 0.800 m
caisson
exca. dispose
B.F.
8.000 m
location MH HG -5 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
H 5.275 16.512 0.750
W Volume 0.175 6.06 0.800 157.77 0.00 163.83
granolitic benching
1 3.14
3.800
2.300
14.16
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
8.000
23.387
0.350
205.82
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 8.000
5.275 16.512 0.750 23.387
0.175 0.800
36.07 394.42 0.00 588.05
1,390.85 m3 caisson (G35) 351.31 m3 1,039.54 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
1018.54
2 C L C
wall lower cobel
L base
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
No. Spac'g Length 112 0.150 12.94 81 0.150 17.51 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.80
mass 2.466 2.466 6.313 6.313 2.466 2.466
rebar 0.0 0.0 0.0 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope
Qty 1,391 352 1,040 164 15 206 37 1,177 1,019 5 1 2 1 3 19 19 1 1
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no no m m no no
0.0
Amount -
164
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
$-
cast in-situ pipe 2.00 m dia 1 1.80 m H1 5.275 m W1 0.175 dia 2 H2 W2
3.40 m 16.225 m 0.800 m
caisson
exca. dispose
B.F.
8.000 m
location MH HG -4 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
H 5.275 16.225 0.750
W Volume 0.175 6.06 0.800 155.03 0.00 161.09
granolitic benching
1 3.14
3.800
2.300
14.16
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
8.000
23.100
0.350
203.29
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 8.000
5.275 16.225 0.750 23.100
0.175 0.800
36.07 387.57 0.00 580.83
1,373.78 m3 caisson (G35) 345.67 m3 1,028.11 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
1004.47
2 C L C
wall lower cobel
L base
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
No. Spac'g Length 110 0.150 12.94 81 0.150 17.23 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.80
mass 2.466 2.466 6.313 6.313 2.466 2.466
rebar 0.0 0.0 0.0 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope
Qty 1,374 346 1,029 162 15 204 37 1,162 1,005 5 1 2 1 3 19 19 1 1
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no no m m no no
0.0
Amount -
162
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
$-
cast in-situ pipe 2.00 m dia 1 1.80 m H1 5.275 m W1 0.175 dia 2 H2 W2
3.40 m 15.300 m 0.800 m
caisson
exca. dispose
B.F.
8.000 m
location MH HG -3 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
H 5.275 15.300 0.750
W Volume 0.175 6.06 0.800 146.19 0.00 152.25
granolitic benching
1 3.14
3.800
2.300
14.16
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
8.000
22.175
0.350
195.15
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 8.000
5.275 15.300 0.750 22.175
0.175 0.800
36.07 365.47 0.00 557.57
1,318.77 m3 caisson (G35) 327.50 m3 991.27 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
959.11
2 C L C
wall lower cobel
L base
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
No. Spac'g Length 103 0.150 12.94 81 0.150 16.30 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.80
mass 2.466 2.466 6.313 6.313 2.466 2.466
rebar 0.0 0.0 0.0 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope
Qty 1,319 328 992 153 15 196 37 1,116 960 5 1 2 1 3 18 18 1 1
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no no m m no no
0.0
Amount -
153
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
$-
cast in-situ pipe 2.00 m dia 1 1.80 m H1 5.275 m W1 0.175 dia 2 H2 W2
3.40 m 13.517 m 0.800 m
caisson
exca. dispose
B.F.
8.000 m
location MH HG -2 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
H 5.275 13.517 0.600
W Volume 0.175 6.06 0.800 129.16 0.00 135.22
granolitic benching
1 3.14
3.800
2.300
14.16
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
8.000
20.392
0.350
179.46
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 8.000
5.275 13.517 0.750 20.392
0.175 0.800
36.07 322.88 0.00 512.74
1,212.73 m3 caisson (G35) 292.48 m3 920.25 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
871.69 2 C L C
wall lower cobel
L base
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope 1200 bell mouth 1200 DI pipe 1200 flange 90O duckfoot bend (G25)
Qty 1,213 293 921 136 15 180 37 1,026 872 5 1 2 1 2 16 16 1 1 1 16 6 1 633
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 2 1 3 0
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no no m m no no no m no no m3
No. Spac'g Length 92 0.150 12.94 81 0.150 14.52 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.50
mass 2.466 2.466 6.313 6.313 2.466 2.466 Total
rebar 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Amount -
136
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
88.71 77.02
$-
cast in-situ pipe 2.00 m dia 1 1.80 m H1 0.000 m W1 0.175
location MH HG -6a Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 2.088 3.800 4.300
H 0.000 2.410 0.600
W Volume 0.175 0.00 0.800 23.03 0.00
dia 2 H2 W2
3.40 m 2.410 m 0.800 m
granolitic benching
1 3.14
3.800
2.300
14.16
caisson
6.000 m
Lean conc
0 3.14
4.300
0.050
0.00
1 3.143
6.000
31.455
0.350
207.62
1 3.14 2 3.14 0 3.14 1 3.143
2.175 3.800 3.800 6.000
0.000 2.410 0.750 31.455
0.175 0.800
0.00 57.57 0.00 593.18
exca. dispose
B.F.
23.03
1,109.45 m3 caisson (G35) 47.34 m3 1,062.11 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
650.75 2 C L C
wall lower cobel
L base
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing Inter. Slab c/w railing 250mm upvc vent pipe cat ladder safety net safety rope 1200 bell mouth 1200 DI pipe 1200 flange 90O duckfoot bend (G25)
Qty 1,110 48 1,063 24 15 208 1,187 651 1 1 1 0 0 1 1 2 39 16 1 802
T 20 T 20 T 32 T 32 T 20 T 20
No. 2 2 0 0 0 0
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no no m m no no no m no no m3
No. Spac'g Length 18 0.150 12.94 81 0.150 3.41 23 0.150 11.94 23 0.150 8.60 81 0.150 2.95 30 0.150 5.50
mass 2.466 2.466 6.313 6.313 2.466 2.466 Total
rebar 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Amount -
24
1.80 m dia 1.80 m dia 610 mm dia 1.80 m dia 3.40 m dia
116.59 89.15
11
$-
cast in-situ pipe 0.30 m dia 1 1.50 m H1 7.746 m W1 0.175
location MH HG -10 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 1.788 1.690 2.190
H 7.746 0.750 0.500
W Volume 0.175 7.62 0.380 1.52 0.00
dia 2 H2 W2
1.50 m 0.750 m 0.380 m
granolitic benching
1 3.14
1.690
0.450
0.89
caisson
8.000 m
Lean conc
0 3.14
2.190
0.050
0.00
1 3.143
8.000
10.096
0.350
88.85
1 3.14 2 3.14 0 3.14 1 3.143
1.875 1.690 1.690 8.000
7.746 0.750 0.750 10.096
0.175 0.380
45.65 7.97 0.00 253.86
exca. dispose
B.F.
9.14
600.42 m3 caisson (G35) 33.83 m3 566.59 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
307.48
0.3 C L
wall lower base
T 20 T 20 T 20
No. 2 2 0
No. Spac'g Length mass 6 0.150 6.31 2.466 37 0.150 1.75 2.466 16 0.150 3.19 2.466
rebar 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing cat ladder (G25)
Qty 601 34 567 10 1 89 46 508 308 8 1 1 1 8 38
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no m m3
0.0
Amount -
10
1.50 m dia 1.50 m dia 610 mm dia 1.50 m dia
$-
cast in-situ pipe 0.30 m dia 1 1.50 m H1 12.131 m W1 0.175
location MH HG -11 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 1.788 1.690 2.190
H 12.131 0.750 0.500
W Volume 0.175 11.93 0.380 1.52 0.00
dia 2 H2 W2
1.50 m 0.750 m 0.380 m
granolitic benching
1 3.14
1.690
0.450
0.89
caisson
8.000 m
Lean conc
0 3.14
2.190
0.050
0.00
1 3.143
8.000
14.481
0.350
127.44
1 3.14 2 3.14 0 3.14 1 3.143
1.875 1.690 1.690 8.000
12.131 0.750 0.750 14.481
0.175 0.380
71.49 7.97 0.00 364.12
exca. dispose
B.F.
13.45
861.20 m3 caisson (G35) 51.27 m3 809.93 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
443.58
0.3 C L
wall lower base
T 20 T 20 T 20
No. 2 2 0
No. Spac'g Length mass 6 0.150 6.31 2.466 37 0.150 1.75 2.466 16 0.150 3.19 2.466
rebar 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing cat ladder (G25) 300 dia backdrop 300 tee 300 angle
Qty 862 52 810 14 1 128 72 729 444 12 1 1 2 13 239 8 1 1
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no m m3 m no no
0.0
Amount -
14
1.50 m dia 1.50 m dia 610 mm dia 1.50 m dia 115 107.37
$-
cast in-situ pipe 0.30 m dia 1 1.50 m H1 4.814 m W1 0.175
location MH HG -12 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 1.788 1.690 2.190
H 4.814 0.750 0.500
W Volume 0.175 4.74 0.380 1.52 0.00
dia 2 H2 W2
1.50 m 0.750 m 0.380 m
granolitic benching
1 3.14
1.690
0.450
0.89
caisson
8.000 m
Lean conc
0 3.14
2.190
0.050
0.00
1 3.143
8.000
7.164
0.350
63.05
1 3.14 2 3.14 0 3.14 1 3.143
1.875 1.690 1.690 8.000
4.814 0.750 0.750 7.164
0.175 0.380
28.37 7.97 0.00 180.14
exca. dispose
B.F.
6.26
426.05 m3 caisson (G35) 22.16 m3 403.89 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
216.48
0.3 C L
wall lower base
T 20 T 20 T 20
No. 2 2 0
No. Spac'g Length mass 6 0.150 6.31 2.466 37 0.150 1.75 2.466 16 0.150 3.19 2.466
rebar 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing cat ladder (G25)
Qty 427 23 404 7 1 64 29 361 217 5 1 1 5 38
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no m m3
0.0
Amount -
7
1.50 m dia 1.50 m dia 610 mm dia 1.50 m dia
$-
cast in-situ pipe 0.30 m dia 1 1.50 m H1 2.519 m W1 0.175
location MH HG -13 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 1.788 1.690 2.190
H 2.519 0.750 0.350
W Volume 0.175 2.48 0.380 1.52 0.00
dia 2 H2 W2
1.50 m 0.750 m 0.380 m
granolitic benching
1 3.14
1.690
0.450
0.89
caisson
8.000 m
Lean conc
0 3.14
2.190
0.050
0.00
1 3.143
8.000
4.869
0.350
42.85
1 3.14 2 3.14 0 3.14 1 3.143
1.875 1.690 1.690 8.000
2.519 0.750 0.750 4.869
0.175 0.380
14.85 7.97 0.00 122.43
exca. dispose
B.F.
4.00
289.57 m3 caisson (G35) 13.03 m3 276.54 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
145.25
0.3 C L
wall lower base
T 20 T 20 T 20
No. 2 2 0
No. Spac'g Length mass 6 0.150 6.31 2.466 37 0.150 1.75 2.466 16 0.150 2.89 2.466
rebar 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing cat ladder (G25)
Qty 290 14 277 4 1 43 15 245 146 3 1 1 3 38
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no m m3
0.0
Amount -
4
1.50 m dia 1.50 m dia 610 mm dia 1.50 m dia
$-
cast in-situ pipe 0.30 m dia 1 1.50 m H1 4.652 m W1 0.175
location MH HG E6 Description no. pie wall upper (G40) 1 3.14 wall lower (G40) 1 3.14 base (G40) 0 3.14
dia 1.788 1.690 2.190
H 4.652 0.750 0.500
W Volume 0.175 4.58 0.380 1.52 0.00
dia 2 H2 W2
1.50 m 0.750 m 0.380 m
granolitic benching
1 3.14
1.690
0.450
0.89
caisson
8.000 m
Lean conc
0 3.14
2.190
0.050
0.00
1 3.143
8.000
7.002
0.350
61.63
1 3.14 2 3.14 0 3.14 1 3.143
1.875 1.690 1.690 8.000
4.652 0.750 0.750 7.002
0.175 0.380
27.42 7.97 0.00 176.06
exca. dispose
B.F.
6.10
416.42 m3 caisson (G35) 21.52 m3 394.90 m3 wall upper (fwk) wall lower (fwk) base (fwk) caisson (fwk)
211.45
0.3 C L
wall lower base
T 20 T 20 T 20
No. 2 2 0
No. Spac'g Length mass 6 0.150 6.31 2.466 37 0.150 1.75 2.466 16 0.150 3.19 2.466
rebar 0.0 0.0 0.0
Total
exca. dispose B.F. (G40) granolitic benching Lean conc (G35) rebar BRC A10 BRC A13 formwork chamber ring Top slab air & water tight cover Inter. Slab c/w railing cat ladder (G25) 300 dia backdrop 300 tee 300 angle
Qty 417 22 395 7 1 62 28 353 212 5 1 1 5 139 4 1 1
Unit Rate m3 m3 m3 m3 m3 m3 m3 kg m2 m2 m2 m no no no m m3 m no no
0.0
Amount -
7
1.50 m dia 1.50 m dia 610 mm dia 1.50 m dia 118.27 115.2
$-
1072
35
30
1 37
25
15 289
15 260
15 206
15 204
15 196
15 180
633
15 208
802
1 89
38
1 128
239
1 64
38
1 43
38
1 62
139
1966
111
1927
PUB CONTRACT Project: 3 - DRAINS @ GEYLANG Chainage
length width
Drain exist'g level
Avg.dp inner propose
outer propose
diff
Volume Area
diff
AMK Ave 1 - South 370.0 390.0 420.0 430.0 450.0 470.0 490.0 510.0 530.0 540.0 560.0 580.0 590.0 610.0 635.0 640.0 660.0 680.0 690.0
370.0 390.0 420.0 430.0 450.0 470.0 490.0 510.0 530.0 540.0 560.0 580.0 590.0 610.0 635.0 640.0 660.0 680.0 690.0 707.0
20.0 30.0 10.0 20.0 20.0 20.0 20.0 20.0 10.0 20.0 20.0 10.0 20.0 25.0 5.0 20.0 20.0 10.0 17.0
0.0 2.0 2.5 3.0 3.0 6.0 6.0 6.0 6.0 6.0 8.0 13.0 13.0 6.0 4.5 4.5 3.0 2.0 4.5 3.0
110.890 111.060 111.060 111.180 111.350 111.615 111.880 112.340 112.710 112.890 112.990 113.000 113.000 113.010 113.010 113.210 113.240 113.360 113.480 113.860
111.216 111.369 111.521 111.572 111.674 111.751 111.827 111.904 111.980 112.123 112.222 112.321 112.371 112.449 112.565 112.565 112.699 112.796 112.707 112.707
(0.326) (0.309) (0.461) (0.392) (0.324) (0.136) 0.053 0.436 0.730 0.767 0.768 0.679 0.629 0.561 0.445 0.645 0.541 0.564 0.773 1.153
0 0 0 0 0 0 0.053 0.436 0.730 0.767 0.768 0.679 0.629 0.561 0.445 0.645 0.541 0.564 0.773 1.153
-
0.000 0.000 0.000 0.000 0.000 0.000 0.026 0.218 0.365 0.383 0.384 0.340 0.315 0.281 0.223 0.322 0.270 0.282 0.387 0.577
0.000 0.000 0.000 0.000 0.000 0.013 0.122 0.292 0.374 0.384 0.362 0.327 0.298 0.252 0.273 0.296 0.276 0.334 0.482
-
0.00 0.00 0.00 0.00 0.00 1.59 14.67 34.98 44.91 26.86 75.97 85.02 28.26 26.41 30.66 5.56 13.81 21.73 18.06
40.0 75.0 30.0 60.0 120.0 120.0 120.0 120.0 60.0 160.0 260.0 130.0 120.0 112.5 22.5 60.0 40.0 45.0 51.0
428.49
1746.00
1.05 449.91 Slip Rd A 10.0 20.0 30.0 40.0 50.0 60.0
10.0 20.0 30.0 40.0 50.0 60.0 70.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0
0.0 0.0 5.0 7.0 7.0 20.0 5.0 2.0
114.656 114.429 114.201 113.973 113.798 113.623 113.553
114.656 116.929 117.701 117.473 123.798 116.123 114.553
2.500 3.500 3.500 10.000 2.500 1.000
2.500 3.500 3.500 10.000 2.500 1.000
-
0.000 0.000 1.250 1.750 1.750 5.000 1.250 0.500
0.000 0.000 0.625 1.500 1.750 3.375 3.125 0.875
0.00 0.00 15.63 90.00 122.50 455.63 390.63 30.63
50.0 70.0 70.0 200.0 50.0 20.0
1105.02
460.00
1.05 9539271.xls/earth/76
1160.27
Slip Rd B 15.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0
15.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
15.0 5.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
0.0 0.0 1.0 5.0 7.0 11.0 10.0 8.0 5.0 -
113.596 113.596 113.590 113.584 113.590 113.654 113.771 113.888 114.005
114.656 114.096 116.090 117.084 119.090 118.654 117.771 116.388 114.005
1.060 0.500 2.500 3.500 5.500 5.000 4.000 2.500 -
1.060 0.500 2.500 3.500 5.500 5.000 4.000 2.500 -
-
0.000 0.530 0.250 1.250 1.750 2.750 2.500 2.000 1.250 0.000
0.000 0.265 0.390 0.750 1.500 2.250 2.625 2.250 1.625 0.625
0.00 0.00 2.93 11.25 90.00 202.50 275.63 202.50 105.63 15.63
5.0 50.0 70.0 110.0 100.0 80.0 50.0 -
906.07
465.00
1.05 951.37 Slip Rd C 35.0 40.0 50.0 60.0 75.0 90.0 100.0
35.0 40.0 50.0 60.0 75.0 90.0 100.0 110.0
5.0 10.0 10.0 15.0 15.0 10.0 10.0 -
0.0 2.0 4.5 5.0 10.5 14.0 9.0 6.0
115.007 114.824 114.678 114.130 113.657 113.626 113.771
116.007 117.074 117.178 119.380 120.657 118.126 116.771
1.000 2.250 2.500 5.250 7.000 4.500 3.000 -
1.000 2.250 2.500 5.250 7.000 4.500 3.000
-
0.000 0.500 1.125 1.250 2.625 3.500 2.250 1.500 0.000
0.000 0.250 0.813 1.188 1.938 3.063 2.875 1.875 0.750
0.00 0.00 13.20 56.41 150.16 562.73 495.94 140.63 22.50
10.0 45.0 50.0 157.5 210.0 90.0 60.0 -
1441.57
622.50
1.05 1513.65
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
121.5 57.0 290.2 409.8 655.0 593.3 471.1 291.0 -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
116.0 263.4 292.9 626.7 844.6 531.6 350.3
0.00
5914.40
1.05 0
Slip Rd D 30.0 40.0 50.0 60.0 70.0 80.0
30.0 40.0 50.0 60.0 70.0 80.0 90.0
10.0 10.0 10.0 10.0 10.0 10.0
2.0 9.0 15.0 10.0 7.0 4.0 2.0
113.696 113.723 113.750 113.778 113.805 113.832 113.860
114.696 118.223 121.250 118.778 117.305 115.832 114.860
1.000 4.500 7.500 5.000 3.500 2.000 1.000
1.000 4.500 7.500 5.000 3.500 2.000 1.000
-
0.500 2.250 3.750 2.500 1.750 1.000 0.500
0.250 1.375 3.000 3.125 2.125 1.375 0.750
0.00 0.00 360.00 390.63 180.63 75.63 22.50
90.0 150.0 100.0 70.0 40.0 20.0
0.00 0.00 0.00 0.00 0.00 0.00 0.00
114.7 532.0 909.4 593.9 410.6 231.7 114.9
9539271.xls/earth/77
90.0 100.0
100.0 105.0
10.0 5.0
1.0 0.5
113.873 113.887
113.9 113.8
114.373 114.137
0.1
0.500 0.250
0
0.500 0.250 -
-
0.03
0.250 0.125 0.000
0.375 0.188 0.063
5.63 1.41 0.08
10.0 2.5 -
1036.51
482.50
1.05 1088.34
0.00 0.00 0.00 0.00 0.00 0.00 0.00
57.2 28.5 -
9539271.xls/earth/78
MATERIAL PROJECT: DATE : FILENAME:MATERIALS
S/N
MATERIALS 1
2
3 4 MATERIAL LABOUR
5 WASTE
EA 01 EA 02 EA03 EA04
Bulk Excavation Excavate for drains Disposal Earth Fill
CE 01 CE 02 CE 03 CE 04 CE 05
Concrete Sand Granite Dust Graded stone Granite Aggregate Sub-base / HC
CE 10 CE 11 CE 12 CE 13 CE 14 CE 15 CE 16
Lean Conc G15 Conc G20 Conc G25 Conc G30 Conc G35 Conc G40 Conc G45
CE 20 CE 21
HT Rebar MS Rebar
1.00
0.30
CE 30 CE 31 CE 32 CE 33 CE34
BRC B06 BRC B08 BRC B10 BRC B12 BRC A05
4.14 6.23 8.55 11.45 1.83
0.52 0.83 1.14 1.53 0.22
-5% -5% -5% -5% -5%
CE 40 CE 41
PLAIN FWK ROUND FWK
4.71 9.42
25.00 25.00
10%
CE 50 CE 51
Premix
5%
CE 60
Geotextile Type A
CE 70 CE 71 CE 72 CE 73
PVC 'B' Pipe 50mm PVC 'B' Pipe 100mm PVC 'B' Pipe 150mm PVC 'B' Pipe 200mm PVC 'C' Pipe 200mm perforated PVC 'C'Pipe 250mm perforated
CE 74 CE 75
Tender / 9539271.xls
60.00 60.00 40.00 39.00 16.00
5% 5% 5% 5% 5%
30.00 30.00 30.00 30.00 30.00 30.00 30.00
5% 5% 5% 5% 5% 5% 5%
80% 130% 130% 130% 130%
7.00 NETT
9 unit
8.00 12.00 8.00 8.00
m3 m3 m3 m3
111.00 183.30 105.80 103.40 49.00
m3 m3 m3 m3 m3
32.00 32.00 32.00 32.00 32.00 32.00 32.00
m3 m3 m3 m3 m3 m3 m3
1.30
kg
4.40 6.70 9.20 12.30 1.90
m2 m2 m2 m2 m2
5%
34.20 34.40
m2 m2
133%
226.10 -
m3 m3
5.00
5.00
m2
1.03 3.00 5.75 9.58
1.00 3.00 5.80 9.60
m m m m
17.50
17.50
m
23.67
23.70
m
95.00
18.00 5.00 5.00 5.00
6 MISC
1.38