Resume Kamal

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Resume Kamal as PDF for free.

More details

  • Words: 1,847
  • Pages: 6
PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

MOHD KAMAL IZHAM WAHAB SENIOR PROJECT & FACILITIES ENGINEER Position:

Senior Project Engineer/Facilities Engineer

Years of Experiences:

6

Qualifications:

BEng (Hons) in Electrical and Electronics Engineering University of Manchester Institute of Science and Technology, Manchester, United Kingdom

Nationality:

Malaysian

Age:

28

PROFESSIONAL EXPERIENCES May 2006 – present Oct 2002 – Apr 2006 Oct 2001 – Sept 2002

Senior Project Engineer – Scientige Sdn Bhd, Kuala Lumpur, Malaysia Facilities Surveillance Engineer – Exxonmobil Exploration and Production Malaysia Inc. Associate Engineer – Exxonmobil Exploration and Production Malaysia Inc.

May 2006 – Present SCIENTIGE SDN BHD Senior Engineer Balingian Line Re-Routing For Gas Supply Improvement to MLNG As a team member for the review of the new system design of rerouting the gas to a lower pressure system. Became the HAZOP scribe and participated throughout the session to identify risk associated with process, operation and maintenance. EnergyFog System Installation at Petronas CUF Seconded to Scientige as the Project Manager for ithe installation of gas turbine inlet cooling system. Involved in bid submission and technical evaluation sessions. Prepared presentation on the technical details of the system and benefit analysis. Preparing Vendor Development Program (VDP) package for Scientige to become to sole technology provide in Malaysia. Involved in many marketing trips to promote the technology to power plant users. D35 Full Field Review/Field Development Plan

Scientige Sdn Bhd

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Appointed as project engineer. The project involves surface and subsurface study to identify the potential production gain from the D35 filed. Responsible for coordination with the technical team in studying the existing field ullage and capacity, developing conceptual development scheme for various options (gas injection, water injection, IOR) and maturing the study until DBM stage. Area Development Plan (ADP) – Peninsular Gas Fields Development Project for Petronas Carigali Sdn Bhd Key team member completing conceptual studies for Petronas Carigali Sdn Bhd on the development of 14 new gas platform. Studies include developing project objectives, implementation constraint, risk, verifying existing capacity of host tie-in facility, assessing different kind of technologies for acid gas removal, CO2 sequestration, mercury removal, structures, pipeline materials, electrical and mechanical equipment. Involved in running Berwanger Oil & Gas Manager (OGM) software to develop 24 different platform configuration and pipeline network in terms of economics, capital cost, security of supply, material, technical risk and CO2 disposal flexibility. Rank each case to finalize the final one option to be matured in the detailed design phase. Oct 2002 – Apr 2006 EXXONMOBIL PRODUCTION AND EXPLORATION MALAYSIA INC. Facilities Surveillance Engineer Primary responsibilities are: 1. 2. 3. 4. 5.

Providing day-to-day facilities engineering technical support to Irong Barat and Semangkok platform. Analyzing key parameters and recommending action plan in order to maximize production, reduce operation cost and increase safety standard Identifying opportunities to be presented and matured as projects Performing Risk Assessment and HAZOP Prioritizing asset workplan in accordance to company focus area and business plan

Asset Business Plan Development Lead engineer responsible to assist Operation Superintendent in developing Irong Barat/ Semangkok yearly business plan. Identify key focus areas in order to align with company’s guiding principles. Creating specific objectives for the upcoming year projects, uptime target, resource availability and expenditure profile. Semangkok A Platform Topside Sand Removal Facility Lead and responsible for developing a sand management strategy in order to reduce planned downtime due for sand cleaning. Evaluated several options on online sand removal equipment for the most optimum solution in terms of cost, downtime avoidance and safety risk. Designed and installed bypass piping, developed isolation philosophy, upgraded transmitters and revised offshore work specific procedure. Irong Barat B/C Satellite Platform Design Support and Commissioning Scientige Sdn. Bhd.

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Key interface between operations and project department. Heavily involved from the conceptual phase, detailed design until startup and commissioning. Contributed in the development of Design Basis Memorandum and Engineering Technical Data Book and participated in various design and operability risk assessment prior to construction. Led the Platform Safety Startup Review (PSSR), preparation of startup procedures, pipeline dewatering strategy and table-top startup simulation for offshore personnel. Irong Barat A Compression and Expansion Project Key interface between operation and project department for the installation of a new compressor, dehydration system, fuel gas skid and changes to process vessel configuration. Reviewed Design Basis Memorandum and Engineering Technical Data Book. Participated in various construction risk assessment (CRA). Develop interim startup strategy where compressor is commissioned without the availability of the dehydration unit. Conducted compressor startup sequence refresher training for offshore personnel. Irong Barat A/C Production Debottlenecking Lead and responsible for designing additional flowlines tie-ins and to split flow Irong Barat C into two parallel Irong Barat A production separator, due to higher production of Irong Barat C than the original design. Performed calculation for pressure drop, erosional velocity, and maximum vessel and associated instrumentation capacity. Integrated with daily operation activity e.g. reduction of production cutback during pipeline pigging. Reassessed the platform overall blowdown limit and resulted in increase of gas production. Irong Barat A Acceleration of Tail Reserves Recovery Lead and responsible to evaluate strategies to recover remaining oil reserves prior to production sharing contract expiry. Main options are either to increase production or reduce the reservoir decline rate. Worked with reservoir and machinery department to obtain the production profile, facilities upgrade and life cycle cost associated with every options. Semangkok A Produced Water System Capacity Reinstement Lead and responsible to restore produce water system capacity in view of facilities deterioration, increase in sand production and tight oil-water emulsion. Initiated replacement of CPI internal corrugated plates, control valves upgrade, chemical injection optimization and sand cleaning strategy. Re-prioritized well flowing seriatim to result in maximum production within the tolerable sand and emulsion handling limit. Fieldwide Equipment Upgrade Recommendation Undertook the task of studying and recommending alternative models for critical equipment to improve reliability and life cycle cost. Implemented recommendations are chemical injection pump for acidic demulsifiers, control valves for high sand erosion condition and level transmitter application on waxy crude. On average, improved reliability to three times. Semangkok/Irong Barat Infill Drilling Program Key member in developing Field Development Plan, identifying challenges in order to finalize the schedule of infill drilling. Contributed for topside facilities preparation work such as platform modification, flowline procurement and installation. Worked with consultant for platform structural analysis and initiated platform strengthening work. Participated in tender-

Scientige Sdn. Bhd.

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

rig mob/demob risk assessment. Optimized planned downtime for the rig heavy lifting activity. Irong Barat Emulsion Wells Back-on-Line Lead and responsible to BOL emulsion wells without creating upset to downstream facilities. Led the risk assessment between Irong Barat and TCOT team. Developed BOL procedure, sampling and contingency plan for off-spec crude and oil sheen avoidance. Followed through implementation until successful BOL. Semangkok A Back-up Fuel Gas System Designed a split piping configuration in order tap the fuel gas from turbo compressor while the turbo generator fuel gas scrubber was offline. Ran HYSIS simulation to determine optimum flowrate, temperature and dew point. Installed piping and successfully commissioned the system that resulted in operating cost reduction from using diesel. Risk Assessments Semangkok scheduled sand cleaning deferment - Lead Assessed the risk of deferring the 6-monthly scheduled shutdown for sand cleaning. The scope covers assessing the risk of hydrocarbon leaks, instrumentation failure and environmental exposure due to oil spill. TCOT impact from Irong Barat emulsion wells - Lead Assessed the risk of bringing back a prolonged shut-in emulsion wells and the impact to the downstream crude oil terminal. The scope covers downtime due to off-specification produced water quality and environmental exposure due to oil spill. Semangkok welding work during pressurized shutdown - Lead Assessed the risk of performing a welding work simultaneously during a shutdown without depressurization scenario, in order to reduce the downtime. The scope covers risk of explosion due to leaks and gas clouds. Semangkok fuel gas scrubber metallurgy change – Lead Assessed the risk of substituting low temperature allow with normal carbon steel in order to mitigate prolonged downtime due to exotic material leadtime. The scope covers personnel injury and gas release concern due to low temperature brittleness. Irong Barat flare ignitor outage – Member Assessed the risk of operating Irong Barat platform without the continuous ignition from the faulty flare ignitor, during a low to zero flare gas scenario. The scope covers risk of gas clouds engulfing the platform. Irong Barat 5-yearly PHA review – Member Took part in the scheduled 5 yearly PHA review that involves review of overall technical conformity, list of MOC, escape routes, personnel protection, drawings and area classification. Ranked the findings and presented to management on the recommended action plans. Scientige Sdn. Bhd.

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Semangkok/Irong Barat Rig Mob/Demobilization – Member Assessed the risk of performing rig up/down activities during a partial shutdown scenario. The scope covers risk of dropped objects onto the platform leading to hydrocarbon release. Irong Barat new Fuel Gas system installation – Member Assessed the risk of the new fuel gas system installation work and also removal and demolishment of the old system. The scope covers from lifting from the boat and dropped objects scenario. Oct 2001 – Sept 2002 EXXONMOBIL PRODUCTION AND EXPLORATION MALAYSIA INC. Associate Engineer Mainly involved in the On-the-Job training. Work schedule are typically 4 days offshore and 4 days office based. Being exposed to Facilities, Machinery, Corrosion and Materials, Reservoir and Workover Department. Presented to Management on the following topic: • •

Compressor start-up sequence – method to shorten startup time Pigging activities – reducing production cutback

PROFESSIONAL TRAINING & COURSE • Surface Facilities Design • Practical Aspects of Control Instrumentations • Hybrid System for SFD platform • Gycol Dehydration System • Solar Centaur Turbo-Tronic Logic • ABB DCS Graphic Configuration • Risk Assessment Level 2 • Leadership Fundamentals • Kepner-Tregoe Problem Solving and Decision Making • Technical Writing Skills • Familiar with HYSYS, FEP and DESC • Familiar with oil & gas industry standard codes i.e API 14C, API RP 500, etc EDUCATION & TRAINING BEng (Hons) in Electrical and Electronics Engineering University of Manchester Institute of Science and Technology, Manchester, United Kingdom. 1998 – 2001

Scientige Sdn. Bhd.

process

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA, BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. – SARAWAK OPERATIONS TENDER NO.: S07/H/087

Scientige Sdn. Bhd.

process

Related Documents

Resume Kamal
November 2019 31
Kamal
October 2019 32
Kamal
November 2019 31
Kamal
November 2019 42
Kamal Siddhee
December 2019 17
Kamal Atarturk
November 2019 14