Reedy Creek Wetland MANAGEMENT PLAN 2006
LAPS Lower Murray Local Action Planning Groups Kjartan Tumi Bjornsson
Mannum to Wellington Local Action Planning Inc.
Reedy Creek Wetland Management Plan 2006
TABLE OF CONTENTS TABLE OF CONTENTS ................................................................................................................... i LIST OF FIGURES...................................................................................................................... ii LIST OF MAPS ........................................................................................................................... ii LIST OF TABLES ........................................................................................................................ ii Chapter 1.
INTRODUCTION ..................................................................................................... 5
1.1
Environmental, Social and Cultural Significance of wetland ............................................. 5
1.2
Why does Reedy Creek wetland need a management plan? ........................................... 6
(a)
Mission Statement ....................................................................................................... 7
(b)
Vision Statement ......................................................................................................... 7
(c)
Broad Objectives ............................................................................................................. 7
(d)
Current Achievements ................................................................................................. 7
Chapter 2.
SITE DESCRIPTION OF REEDY CREEK WETLAND ............................................. 8
2.1
Wetland Location and Description ................................................................................... 8
2.2
Survey Sites, Dates & Locations...................................................................................... 8
2.3
Physical Features ............................................................................................................ 9
(a)
Reedy Creek wetland in Current State ......................................................................... 9
(b)
Geomorphology, Geology And Soils .......................................................................... 11
(c)
Climate .......................................................................................................................... 13
(d)
Wetland Volumes and Water Requirements for Various Filling Stages ...................... 13
(e)
Surface and Groundwater Features ........................................................................... 14
2.4
Ecological Features ....................................................................................................... 21
(a)
Flora .......................................................................................................................... 21
(b)
Fauna ........................................................................................................................ 22
2.5
Implications for Management ......................................................................................... 25
Chapter 3.
SOCIAL ECONOMIC AND CULTURAL VALUES .................................................. 28
Chapter 4.
LAND TENURE, JURISDICTION AND MANAGEMENT ARRANGEMENTS ......... 29
Chapter 5.
THREATS AND POTENTIAL SOLUTIONS TO REEDY CREEK WETLAND ......... 32
Chapter 6.
MANAGEMENT OBJECTIVES .............................................................................. 36
Chapter 7.
IMPLEMENTATION OF PLAN ............................................................................... 40
7.1
ON GROUND ACTION AND TIMETABLE ..................................................................... 41
7.2
WETLAND WATER OPERATIONAL PLAN ................................................................... 44
(a)
Water regime ............................................................................................................. 44
(b)
Volume calculations ................................................................................................... 45
Chapter 8.
MONITORING ....................................................................................................... 47
Chapter 9.
EVALUATION, REVIEW AND REPORTING .......................................................... 49
9.1
Evaluation and Review .................................................................................................. 49
9.2
Reporting ....................................................................................................................... 49
Chapter 10.
REFERENCES ...................................................................................................... 50 i
Reedy Creek Wetland Management Plan 2006 (a)
Flora of Reedy Creek Wetland ................................................................................... 59
(b)
Birds of Reedy Creek Wetland ................................................................................... 62
(c)
Fish ............................................................................................................................... 69
(d)
Macroinvertebrates .................................................................................................... 70
LIST OF FIGURES Figure 1: Reedy Creek sheet piling structure 20/07/06 (TB) .......................................................... 10 Figure 2: Reedy Creek sheet piling structure 20/07/06 (TB) .......................................................... 10 Figure 3: Reedy Creek embankment January 2004 (AF) .............................................................. 11 Figure 4: Reedy Creek embankment revegetation January 2004 (AF) .......................................... 11 Figure 5: Reedy Creek embankment revegetation and turtle eggs January 2004 (AF) .................. 11 Figure 6: Reedy Creek embankment 20/07/06 (TB) ...................................................................... 11 Figure 7: Geology section of Reedy Creek between road and creek delta .................................... 12 Figure 8: Geology of Reedy Creek ................................................................................................ 12 Figure 9: River and wetland connection seen from wetland 09/03/06 (TB) .................................... 18 Figure 10: Reedy Creek delta on left of picture 09/03/06 (TB) ....................................................... 18 Figure 11: Years river water levels exceeded 1.3m between 1974 and 2006 ................................ 41 Figure 12: Water regime ‘normal’ managed drying event .............................................................. 44 Figure 13: Water regime 2007 extreme drying event ..................................................................... 45 Figure 14: Median monthly rainfall at Mt. Crawford Forest ............................................................ 45
LIST OF MAPS Map 1: Pre 1940 observations by Arthur Hein ................................................................................. 6 Map 2: Reedy Creek wetland location ............................................................................................. 8 Map 3: Area of Reedy Creek used for volume estimates............................................................... 14 Map 4: Current water movement into the wetland & wetland structure .......................................... 17 Map 5: FIM III flow volume to surpass sheet pile structure ............................................................ 19 Map 6: Cadastral boundaries covering Reedy Creek wetland and surrounds. ............................... 29 Map 7: Open water v’s hydrologically managed sections .............................................................. 40 Map 8: Vegetation map from 1975 ................................................................................................ 61
LIST OF TABLES Table 1: Baseline survey monitoring parameters and dates ............................................................ 9 Table 2: Summary of wetland volumes within Reedy Creek wetland ............................................. 14 Table 3: Water quality Reedy Creek wetland ................................................................................ 15 Table 4: Water quality Reedy Creek.............................................................................................. 16 Table 5: Acid sulphate soil survey ................................................................................................. 16 Table 6: Recent surface water quality at site REEWQ01............................................................... 18 ii
Reedy Creek Wetland Management Plan 2006 Table 7: Groundwater monitoring locations ................................................................................... 19 Table 8: Groundwater monitoring results ...................................................................................... 20 Table 9: Most significant habitat use at Reedy Creek wetland....................................................... 23 Table 10: Frogs recorded at Reedy Creek wetland ....................................................................... 24 Table 11: Reedy Creek wetland responsible positions contact details........................................... 31 Table 12: Existing and potential threats to Reedy Creek wetland .................................................. 33 Table 13: Management objectives for Reedy Creek wetland ......................................................... 37 Table 14: Implementation plan for Reedy Creek wetland .............................................................. 43 Table 15: Volume estimate for managed section of wetland ......................................................... 45 Table 16: Calculated water loss (evaporation – precipitation) ....................................................... 46 Table 17: Water use calculation .................................................................................................... 46 Table 18: Permanent photopoint ................................................................................................... 47 Table 19: Monitoring plan for Reedy Creek wetland. ..................................................................... 48 Table 20: Wetland Atlas Data ....................................................................................................... 53 Table 21: Plant Associations at Reedy Creek wetland .................................................................. 59 Table 22: Large and obvious native plants collected by R. I. Thomas (1973b) .............................. 60 Table 23: Vegetation communities in sand mining area of Reedy Creek 1974 .............................. 61 Table 24: Habitat features identified in Reedy Creek wetland ....................................................... 62 Table 25: Bird species observed at Reedy Creek wetland ............................................................ 62 Table 26: Habitat use by waterbird species at Reedy Creek wetland ............................................ 67 Table 27: Fish survey sites ........................................................................................................... 69 Table 28: Fish captured at Reedy Creek ....................................................................................... 70
iii
Reedy Creek Wetland Management Plan 2006
This management plan was written by Kjartan Tumi Bjornsson for the Mannum to Wellington Local Action Planning Committee Inc., and reviewed and endorsed by the SA River Murray Wetland Technical Group. Funding was provided by the National Action Plan for Salinity and Water Quality, the Natural Heritage Trust, and the SA MBD NRM Board. The management plan has been prepared according to the Guidelines for developing wetland management plans for the River Murray in South Australia 2003 (River Murray Catchment Water Management Board and Department of Water Land and Biodiversity Conservation 2003) and as such fulfils obligations under the Water Allocation Plan for the River Murray Prescribed Watercourse. Disclaimer: The Mannum to Wellington Local Action Planning Committee Inc. do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaim all liability for any error, loss or other consequences, which may arise from you relying on any information in this publication. Cite as: Bjornsson, K. T. (2006). Reedy Creek Wetland Management Plan. Mannum to Wellington Local Action Planning Committee Inc., Murray Bridge. Acknowledgements: This wetland management plan has been developed with the support of a number of organisations, community groups and individuals. Special thanks go to Adrienne Frears for assistance with the draft. Thanks also go to those that contributed their knowledge including; the Caloote Landcare group, the South Australian Murray-Darling Basin Natural Resources Management Board and the members of the South Australian River Murray Wetland Technical Group. For further details contact: Mannum to Wellington LAP PO Box 2056 Murray Bridge, SA 5253 Phone: (08) 8531 3222 Fax: (08) 8532 5300 Photographs: Cover photographs: Top, Reedy Creek wetland open water section with the River Murray in the background (TB) Bottom, Sheet pile structure and embankment (TB) Photographs in document (TB) Tumi Bjornsson; (AF) by Adrienne Frears © Mannum to Wellington Local Action Plan 2006
iv
Reedy Creek Wetland Management Plan 2006
Chapter 1.
INTRODUCTION
Since the adoption of the Water Allocation Plan for the River Murray in 2002 the wetlands of South Australia have an annual water allocation of 200GL. To access this water allocation for wetland management, a licence is now required. Reedy Creek wetland is listed in the Water Allocation Plan for the River Murray (River Murray Catchment Water Management Board 2002) and has therefore a right to access to the 200GL. This wetland management plan is structured in accordance with the criteria set out in the Guidelines for developing wetland management plans for the River Murray in South Australia (River Murray Catchment Water Management Board and Department of Water Land and Biodiversity Conservation 2003).
1.1
ENVIRONMENTAL, SOCIAL AND CULTURAL SIGNIFICANCE OF WETLAND
The Wetland Atlas of the South Australian Murray Valley (Jensen et al. 1996) listed Reedy Creek wetland as a permanent wetland being of high conservation value and to be of basin and local importance (see Appendix A). The site is recognised for its importance to waterbirds both in a early 1970‟s report on the site and in the Australian Heritage Database and Australian Heritage Places Inventory (Thomas 1973a; DEH (Commonwealth) 2006a; DEH (Commonwealth) 2006b). Thompson (1986) described the wetland as being a permanent wetland with extensive reed beds Phragmites australis with the wetland providing habitat to an abundance of waterbirds. The wetland was classified with a high conservation value with recommendations for formal conservation status(Thompson 1986)., echoing reports from the 1970‟s such as Chandler et. al. (1979) It is only one of two wetlands along the South Australian River Murray with its own catchment (Frears 2001) and therefore a unique site. Upstream of the wetland is a heritage listed waterfall and conservation area, which attracts visitors to the area. The wetland when rehabilitated could be seen as an informal extension of the conservation area providing a wildlife corridor to the River Murray. The wetland borders on to the Caloote township and is therefore an aesthetic element to the residents. The wetland was described in a sand-mining report as a unique environment in the region based on the variety of habitats allowing a rich and abundant fauna population (Cox 1975). Cox‟s reports are quoted in a communication by (Lothian 1975) who summarises the significance of the area and discuses the consequences of sand mining. This communication describes some of the aspects of the area including the diversity of environments and habitats in the wetland, the potential educational significance in natural and earth sciences and the wetlands significance for fish, crustacean, and amphibian research. There is also a suggestion of a field studies centre (Lothian 1975). The draft management plan by Wetland Care Australia (Jensen et al. 1999) presents an extensive literature review of the environmental significance of Reedy Creek wetland. Some of the information has been reviewed for this management plan. However, most of the anecdotal information was not repeatedly researched. This information includes reports of a steady decline in long-necked turtles and water rats as well as a suggestion of a platypus sighting until the 1970‟s (Cox 1975; Jensen et al. 1999). Further, common wombats were said to have occurred in the area surrounding the wetland disappearing during the 1960‟s (Cox 1975). They were reportedly seen north of the wetlands in the late 1990‟s (Jensen et al. 1999). With minimal effort a significant achievement can be accomplished at this site. Management including hydrological manipulation, revegetation, weed control and feral animal control are expected to deliver a large return for a minimal investment. Based on the past efforts, the significance and uniqueness of the wetland echoed in many reports referenced in this plan the management of Reedy Creek should be of a high priority. A short timeline of management at Reedy Creek wetland (some data from local anecdotal evidence): 5
Reedy Creek Wetland Management Plan 2006
1870 Settlement (Thomas 1973b) Baseby levee completed 1920 – 1921 and feeder channel placed next to it between wetland and river, see Map 1 (Heine 1999) Until the 1940‟s the wetland area was fenced and grazed. This area was inundated following the completion of the barrages. The fence line could still be seen in the wetland in the 1970‟s (Thomas 1973a) Sand mining (intermittent) for past 25 years (Jensen et al. 1999) 1968 described as a permanent watercourse in McBriar and Milnes (1968), although an annual cycle of winter rain and mid summer dry is described in a 1975 report (Cox 1975). The creek is now regarded as ephemeral (described as lentic (non-flowing) tributary to the River Murray by Pressey (Pressey 1986)) 1968 – 1975 various reports on the importance of the catchment with regard to ecology (vegetation, waterbirds etc.) (McBriar and Milnes 1968; Cox 1973; Thomas 1973b; Thomas 1973a; Cox 1974; Douglas 1974; Cox 1975) 1999 Management brief (Draft Wetland Management Plan) Wetland Care Australia (Jensen et al. 1999) 2001 Honours (A. Frears) 2003 Ph.D. (L. Wen) 2003 Installation of sheet piling structure to manage a section of the wetland (the structure is yet to be tested) 2004-2005 included in River Murray Wetlands Baseline Survey (SKM 2006b) 2005 Construction of rabbit proof fence in a revegetation area close to Caloote Ongoing water quality monitoring by community members
Map 1: Pre 1940 observations by Arthur Hein
1.2
WHY DOES REEDY CREEK WETLAND NEED A MANAGEMENT PLAN?
The wetland is currently impacted on by grazing pressure and habitat limitation due to current management restrictions such as permanent inundation (minimal germination of aquatic 6
Reedy Creek Wetland Management Plan 2006
vegetation). Reedy Creek is seen as a major carp recruiting area. The potential exists to manage carp access and the water regime of a part of the wetland due to a structure constructed by Wetland Care Australia. Through assessment of recently available data as well as historic data and anecdotal information, a better management strategy for the wetland is possible which will address the current ecological constraints on the wetland. (a) MISSION STATEMENT The rehabilitation of Reedy Creek wetland is aimed at maintaining and improving wetland ecological values, such as habitat (wetland fringing and aquatic vegetation) for the benefit of waterbirds, native fish, frogs and macroinvertebrates through native vegetation restoration. (b) VISION STATEMENT The vision for Reedy Creek wetland is a revitalised wetland fulfilling a diversity of habitat requirements for both water birds and other native fauna. The wetland will have regular visits by water birds, including migratory species. The riparian area will be revegetated with local native species, both through active involvement with the removal of weed species and through the encouragement of the growth/reestablishment of native fringing vegetation. Stock access to the wetland will focus on controlled grazing of currently grazed and high vegetation diversity areas (at certain times of the year) thereby minimising stock induced damage but maintaining the diversity of vegetation. (c) BROAD OBJECTIVES The broad objectives of the wetland restoration include: Restore native aquatic and fringing vegetation and therefore habitat for native fauna Restore habitat diversity for water birds and aquatic wildlife: o Birds maintain and improve habitat availability o Fish, increase abundance o Frogs, increase abundance and diversity Monitor the impact of restored hydrology regime for adaptive management (d) CURRENT ACHIEVEMENTS Some of the surrounding land is grazed. The wetland shoreline has partly been fenced off to exclude stock however, more fences are required to appropriately manage stock access to the wetland, in particular to the area to be dried. A sheet pile structure with carp screens has been installed at the wetland, which can be used for flow control. The structure remains untested and may be below the height required at peak spring river levels and therefore be ineffective in carp control. For the structure to be above the maximum peak river levels the structure must be at or above 1.3 m AHD, based on DWLBC surface water records for the past 10 years (DWLBC 2006b). For the structure to successfully dry the wetland during the month of February through to May, it and the surrounding wetland flats must be at above 1 m AHD, based on 10 year surface water records (DWLBC 2006b), see Chapter 7.
7
Reedy Creek Wetland Management Plan 2006
Chapter 2. WETLAND 2.1
SITE
DESCRIPTION
OF
REEDY
CREEK
WETLAND LOCATION AND DESCRIPTION
Reedy Creek wetland is listed as wetland number S0052 in the Wetlands Atlas (Jensen et al. 1996). The wetland is located south of Mannum (Map 2). AMG coordinates 341197 E 6130141 N (Grid Zone 54). Reedy Creek can be found on the 1:50,000 Mannum map sheet number 6728-2 and Tepko map sheet number 6728-3. The wetland is found in the Hundred of Finniss. See Appendix A for more information. Thompson (1986) described the wetland as being a permanent wetland with extensive reed beds Phragmites australis with an abundance of waterbirds. The wetland was classified with a high conservation value with recommendations for formal conservation status (Thompson 1986). The wetland has an area of 101 ha with a catchment of 31,515 ha (315,145,259 m2) (DWLBC 2006a). A 14 ha lagoon was separated from the rest of the wetland when a control structure was constructed. This structure is yet to be tested for its water retention capacity. Reedy Creek reaches depths of approximately 1 m although it is to the most part between 0.5 m and 0.7 m deep (SKM 2006c). The connection to the River Murray is at the downstream end and consists of a wide opening (SKM 2006c). A second stream connection is at the far eastern end of the wetland where Reedy Creek connects to the wetland.
Map 2: Reedy Creek wetland location
The wetland sits on privately held land with multiple owners. The surrounding area is used mainly for grazing, with the very small town of Caloote along the eastern side of the wetland and irrigated agriculture (Baseby irrigation area).
2.2
SURVEY SITES, DATES & LOCATIONS
The River Murray Wetlands Baseline Survey - 2005 (SKM 2006b) monitored different wetland parameters (Table 1). The locations of the baseline survey sites can be seen in Appendix B. 8
Reedy Creek Wetland Management Plan 2006 Table 1: Baseline survey monitoring parameters and dates Parameter
Date 1 (BLS)
Site physical
2005
Vegetation
2005
Date 2 (BLS)
Date 3 (BLS)
Date 4 (BLS)
See page 8
1973
Fish
Autumn
Spring
Birds
Autumn
Spring
21 24
1969 to 1974
Frogs
14/03/05
25/05/05
Macroinvertebrates
06/04/05
19/10/05
Water Quality
04/03/05
06/04/05
24/08/05
19/10/05
Groundwater
27/05/05
12/08/05
13/10/05
30/11/05
2.3
Date other
31/08/05
02/11/05
22 24 25
See text
14 18
PHYSICAL FEATURES
(a) REEDY CREEK WETLAND IN CURRENT STATE Reedy Creek area has been grazed for an extended period, probably since 1870 (Thomas 1973b). As a result, a lot of the native vegetation has been cleared and weeds have been able to spread. Currently the main degradation issue facing Reedy Creek wetland, which is mentioned consistently throughout the baseline survey report as well as previous documents discussing the area (Thomas 1973b; Thomas 1973a; Jensen et al. 1999; Frears 2001), is stock access causing; grazing pressure, pugging, shore erosion and limiting vegetation recruitment. A Wetland Care Australia wetland management draft discussed the possibility of drying out the west end of the wetland. Based on the proposal a sheet pile structure was constructed which included fish grills to exclude carp, see Figure 1 through to Figure 6. Revegetation efforts have been underway to stabilise the embankment constructed as part of the sheet pile structure, see Figure 3 through to Figure 5 for the state of the embankment in 2004, and Figure 6 for the state of the revegetation on the embankment in 2006. The current management planning of this wetland considers the use of this structure for the best possible management approach, fulfilling the most desirable ecological benefits without causing significant environmental detriment. For this purpose past surveys including the recent baseline survey are discussed in the following chapters.
9
Reedy Creek Wetland Management Plan 2006
Figure 1: Reedy Creek sheet piling structure 20/07/06 (TB)
Figure 2: Reedy Creek sheet piling structure 20/07/06 (TB)
10
Reedy Creek Wetland Management Plan 2006
Figure 3: Reedy Creek embankment January 2004 (AF)
Figure 4: Reedy Creek embankment revegetation January 2004 (AF)
Figure 5: Reedy Creek embankment revegetation and turtle eggs January 2004 (AF)
Figure 6: Reedy Creek embankment 20/07/06 (TB)
(b) GEOMORPHOLOGY, GEOLOGY AND SOILS The soil in the wetland was found to be made up of Coonambidgal Formation clay which is grey, soft and plastic (AWE 2006). A very good description of the regional geology can be found in McBriar and Milnes (1968), most of the description of Reedy Creek focuses on the waterfall area of the conservation reserve. There are sand deposits along Reedy Creek in and above the delta into the wetland. These sand deposits were seen as a resource to development expected in the area in the 1970‟s (Cox 1975). Although this development did not proceed, some sand mining was undertaken despite recommendations to the contrary such as by Cox (Cox 1975). In the north and south, the floodplain and wetland is bordered by limestone with alluvial deposits of grey fluviatile silts (clay), sand and gravel with the creek beds composed almost exclusively of sand (Cox 1975; 1979), see Figure 7 and Figure 8. This sand makes up the majority of the creek delta into the wetland (Cox 1975).
11
Reedy Creek Wetland Management Plan 2006
Figure 7: Geology section of Reedy Creek between road and creek delta
Figure 8: Geology of Reedy Creek 12
Reedy Creek Wetland Management Plan 2006
(c) CLIMATE The following climatic conditions are taken from the Bureau of Meteorology (BOM) Murray Bridge station (number 024521) (Latitude (deg S): -35.1234; Longitude (deg E): 139.2592) (BOM 2005). The recording of data commenced at Murray Bridge in 1885; the latest records used in the assessment of the climatic condition of the area stemming from 2004. Reedy Creek wetland has a Mediterranean climate with warm dry summers and cool wet winters. The median (5th decile) annual rainfall is 341.5 mm. The mean monthly maximum rainfall is in June and August (37.1 mm), the minimum in January (16.3 mm). The expected mean daily maximum temperature is highest in February at 29.2 C, lowest in July at 16.2 C, and has an annual mean of 22.7 C. The minimum daily temperature is at its maximum in February at 14.6 C and its minimum in July at 5.4 C. The annual mean daily minimum temperature is 9.8 C. (d) WETLAND VOLUMES AND WATER REQUIREMENTS FOR VARIOUS FILLING STAGES The wetland volume was calculated as part of the baseline survey. Table 2 summarises the wetland water requirement for Reedy Creek wetland as calculated for the area shown in Map 3. A DEM was developed for this area by the baseline survey (see Appendix C). The median River Murray level obtained from the DWLBC Surface Water Archive (DWLBC 2005), calculated from daily readings between 1986 and 2004, is 0.74 m AHD. Reedy Creek can therefore be considered as reaching bank full for most of the time, water requirement calculations will therefore be based the 0.75 m AHD level. The monitoring location, from which the DWLBC Surface Water Archive is derived, is at Murray Bridge Number 1 Pump Station (Zone 54, 344059 E and 6114654 N). Although the wetland has a wide connection with the River Murray a substantial seasonal inflow of water is obtained from the Reedy Creek Catchment. 1.7 GL can come from the Catchment (540mm multiplied by the area). The previous wetland management draft by Wetland Care Australia (Jensen et al. 1999) discussed the flow conditions and describes the impact of a large flood in 1992 where approximately 3.4 GL came down in 1992. According to Jensen (1999) the pattern of flows from Reedy Creek follows the seasonal rain pattern of the Mount Lofty Ranges with sporadic winter flows, drying in mid summer. The volume of the Catchment runoff has not been monitored therefore, calculating the volume of water that Reedy Creek actually draws from the River Murray becomes a complex issue. The water requirement, including evaporative loss, is covered in Chapter 77.2.
13
Reedy Creek Wetland Management Plan 2006
Map 3: Area of Reedy Creek used for volume estimates Table 2: Summary of wetland volumes within Reedy Creek wetland Area (ha)
Area (m2)
Depth m
RLm (AHD)*
Volume m3 (KL)
Volume ML
Observed river level
94
936581.8
~1.0
0.55
632686.7
633
Full
101
1009195.4
~1.2
0.75
639996.0
640
Three quarters full
90
901197.1
~0.9
0.45
623844.5
624
Half full
58
583240.7
~0.6
0.15
463765.9
464
Quarter full
8
82101
~0.3
-0.15
77735.6
8
Filling Stage
Source: Adapted from River Murray Wetlands Baseline Survey - 2005 (SKM 2006c) Base of wetland is to the most par at ~ 0.3 m AHD with the deepest point at -0.45.
(e) SURFACE AND GROUNDWATER FEATURES Surface water The monitored water quality for the wetland can be seen in Table 3, which is adapted from the baseline survey report (MDFRC 2006). The salinity of the wetland ranged from a minimum of 373 EC to a maximum of 3390 EC, the median being 1387. In comparison the monitored River Murray salinity obtained from the DWLBC Surface Water Archive at Murray Bridge (DWLBC 2005), has a median (calculated from daily readings between 1934 and 2004) EC of 500 μS/cm. The maximum wetland recordings were measured at the western end close to the creek inlet. The higher salinity in this area was attributed to evapoconcentration and saline water inflow from Reedy creek (MDFRC 2006). This reflected similar observations to those made by Frears (2001). The dissolved oxygen (DO) concentrations were not seen to be of concern to management of the wetland (MDFRC 2006). The high DO recorded during one sampling event (see Table 3) was attributed to the photosynthetic activity in a shallow region of the wetland (~ 0.1 m). 14
Reedy Creek Wetland Management Plan 2006
The maximum pH was recorded at the west end of the wetland reaching 9.60 which indicates that an algal bloom was potentially present (Goonan 2006), the mean ranged between 7.65 and 8.57. The majority of the pH levels were within the ANZECC (2000) trigger levels for lowland rivers (MDFRC 2006) and is therefore not a concern for management. The turbidity measurements of the wetland were high enough to have an impact on submerged macrophyte growth. Frears (2001) used a secchi disk for do turbidity measurements where the average secchi depth was 10cm, a secchi depth of 17cm was required for PAR light to reach the sediments (assuming an average depth of 60cm). The turbidity increases with an increasing distance from the wetland inlet (connection to River Murray). Therefore, the most likely source of turbidity in the wetland is wind induced resuspension of sediments (MDFRC 2006). The temperatures of the wetland reflected the ambient summer air temperatures (MDFRC 2006). For a description of the implications of water quality in wetlands refer to Your Wetland: Supporting Information (Tucker et al. 2002). Other water quality parameters monitored were not considered a significant management issue and are therefore not discussed in detail in this plan. The only management suggestions made by the baseline survey being to increase the flushing of the wetland, and to observe the impact of saline water inflows for Reedy Creek. Table 3: Water quality Reedy Creek wetland Parameters EC μS/cm
EC μS/cm at No. 1 Pump*
DO mg/L
-1
pH
Turbidity NTU
Water Temperature C
River height No. 1 Pump*
at
n (baseline survey)
Stage 1 04/03/05
Stage 2 06/04/05
Stage 3 24/08/05
Stage 4 19/10/05
Average over survey period
Mean
1101 ± 570
739 ± 295
1777 ± 629
1933 ± 512
1387 ± 1053
Min.
407
373
416
620
373
Max.
2800
1620
3390
3120
3390
Mean
401
393
466
351
398**
Min.
396
388
464
344
393**
Max.
406
400
468
360
403**
Mean
10.1 ± 1.5
8.9 ± 0.4
10.2 ± 0.2
8.0 ± 0.5
9.3 ± 1.7
Min.
8.1
7.9
9.7
6.7
6.7
Max.
14.4
9.6
10.6
8.9
14.4
Mean
8.48 ± 0.35
8.57 ± 0.45
7.84 ± 0.13
7.65 ± 0.18
8.13 ± 0.69
Min.
7.70
7.45
7.51
7.12
7.12
Max.
9.26
9.60
8.11
7.94
9.60
Mean
97 ± 23
142 ± 49
72 ± 34
198 ± 61
127 ± 93
Min.
48
37
22
45
22
Max.
155
273
172
336
336
Mean
20.9 ± 0.3
23.5 ± 0.6
16.2 ± 0.5
17.5 ± 0.1
19.5 ± 3.1
Min.
20.1
22.1
15.2
17.2
15.2
Max.
21.6
24.8
17.2
17.9
24.8
Mean
0.667
0.635
0.897
0.841
0.798**
Min.
0.629
0.603
0.877
0.801
0.74
Max.
0.709
0.681
0.924
0.881
0.85
4
4
4
4
16
Source: Adapted from River Murray Wetlands Baseline Survey – 2005 (MDFRC 2006); * from DWLBC Surface Water Archive (Mannum No.1 Pump Station) (DWLBC 2006b); ** Average for 2005. Refer to Appendix B for the locations of the baseline survey monitoring sites.
Water quality of the Reedy Creek itself was also monitored during the baseline survey. The data can be seen in Table 4. Of the monitored data the only one of concern was the salinity of the creek, these being much higher compared to the wetland. The salinity of the March and April period can probably be associated with evapoconcentration and potential intrusion of saline groundwater (MDFRC 2006). The salinity, during the entire monitored period, was likely to have an adverse 15
Reedy Creek Wetland Management Plan 2006
impact on the freshwater biota (MDFRC 2006). The salinity from the creek could affect Reedy Creek wetland, for example the salt load of the creek may be having an impact on native fish recruitment in the wetland (SARDI Aquatic Sciences 2006a), the management of the wetland should therefore consider this issue. One threat identified is the potential existence or future development of acid sulphate soils due to the observed salinity levels and the saline groundwater intrusion. A study by Lamontagne et. al. (2004) found long term inundated wetlands with high salinity in the lower River Murray to be at risk of having developed potential acid sulphate soils in the recent past (<75 years). Some of the consequences of disturbing potential acid sulphate soils include, deoxygenation of the water column following resuspension of sediment and rapid oxidation of sulfidic material, and acidification and increased toxic heavy metal concentration in the water column following rewetting of a managed dry period in a wetland (Lamontagne et al. 2004). To establish the potential of acid sulphate soils at Reedy Creek wetland a field based survey as described by Baldwin et al. (2006) was used. No evidence of acid sulphate soils were found during a soil sample collection on the 25th October 2006, see Table 5. However, the samples will be sent away for analysis prior to a managed commencement of a dry period. If acid sulphate soils are discovered in the future in the west end of Reedy Creek wetland, the water regime provided in this wetland management plan would need to be reviewed in cooperation with a soil scientist. Table 4: Water quality Reedy Creek Parameters EC μS/cm
DO mg/L
-1
Stage 1 04/03/05
Stage 2 06/04/05
Stage 3 24/08/05
Stage 4 19/10/05
15700
11600
2080
2740
7.3
pH
7.69
Turbidity NTU
Water Temperature C
n (baseline survey)
17
19.6
1
5.8
10.1
8.06
6.2
8.08
80
7.69
4
19.1
12
13.3
1
17.0
1
1
Average over survey period Mean
8030 ± 6707
Min.
2080
Max.
15700
Mean
7.3 ± 2.0
Min.
5.8
Max.
10.1
Mean
7.88 ± 0.22
Min.
7.69
Max.
8.08
Mean
28 ± 35
Min.
4
Max.
80
Mean
17.3 ± 2.9
Min.
13.3
Max.
19.6
n
4
Source: River Murray Wetlands Baseline Survey – 2005 (MDFRC 2006)
Table 5: Acid sulphate soil survey Site
Description
Easting
Northing
EC
Comments
Photos
2400
Black anoxic muck but no sign of sulfidic sediments - no rust colour
1 and 2
3 and 4
Ruppia in next pond, myriophyllum in RC channel
5 - 12
Charaphytes in water, plus myriophyllum
Site 1
In front of Howies'
Site 2
Reedy Creek channel before it enters the wetland
339974
6131754
1407
Sandy substrate- no sulfidic sediments
Site 3
In gully near structure
340160
6131345
1033
Thick mud, sediments
339732
6131570
no
sulfidic
Notes
16
Reedy Creek Wetland Management Plan 2006
Past projects have included water quality sampling at Reedy Creek wetland. These include a Ph.D. project by Wen (2002), an honours project by Frears (2001), the Caloote Landcare Group and Waterwatch monitoring by Palmer Primary School (although their sampling point was located more upstream near Palmer). Frears (2001) found the conductivity at the west end of the wetland at 2.3 mS/cm to be more saline than closer to the river at 0.5 mS/cm. This corresponds to the data monitored by the baseline survey. Frears‟ recommendations at the time included the management by means of drying and wetting of the west end of the wetland only. The threats identified were that the fresher end of the wetland could be degraded by an increase in salinity through increased groundwater intrusion and higher salinity following rewetting. This threat was not as critical in the smaller western end of the wetland as this area is already dominated by more salt tolerant species. The recommendation for management was to dry this western end of the wetland followed by vegetation monitoring to establish the impact on germination in a salt impacted wetland. The drying regime recommended a short dry spell of between 2 and 3 months between February and May. This regime would allow for the peak invertebrate production in January and optimise the plant germination phase in autumn (Frears 2001). The current water flow into the wetland is mainly through a connection between Reedy Creek wetland and the River Murray, which is at the downstream end of the wetland. This wide opening between the wetland and the river can be seen in Map 4 and Figure 9. A second source of water into the wetland is from Reedy Creek at the west end of the wetland, the creek delta can be seen on the left of Figure 10 and Map 4.
Map 4: Current water movement into the wetland & wetland structure
17
Reedy Creek Wetland Management Plan 2006
Figure 9: River and wetland connection seen from wetland 09/03/06 (TB)
Figure 10: Reedy Creek delta on left of picture 09/03/06 (TB)
Surface water monitoring is now continued by the Caloote Landcare Group with assistance from the SA MDB NRM Board. The monitoring schedule is discussed in Chapter 8. The most current surface water quality is presented in Table 6. In comparison between the months of August 2005 & 2006 the temperature remained the same. The turbidity was slightly lower which reflected the lowest observed during the baseline survey during August. The conductivity was significantly lower at 833 versus a mean of 1777 uS/cm. Perhaps there was less flow form Reedy Creek in 2006? The pH was marginally less in 2006. This extra data adds to the current baseline information prior to the change in management of the wetland. Future significant changes should indicate the impacts of management. Table 6: Recent surface water quality at site REEWQ01 SiteName
Date
WaterSource
Parameter
Equipment
Measure
Units
REEWQ01
06-Aug-06
Surface Water
Conductivity
Waterwatch meter
833
uS/cm
REEWQ01
06-Aug-06
Surface Water
Turbidity
Turbidity Tube
50
NTU
REEWQ01
06-Aug-06
Surface Water
pH
Litmus strip
6.5
REEWQ01
06-Aug-06
Surface Water
Nitrate
Aquaspex-N Ned
>0.05
REEWQ01
06-Aug-06
Surface Water
Phosphate
Aquaspex-P MB
0.15
mg/L
REEWQ01
06-Aug-06
Surface Water
Temperature
Thermometer
16
degreesC
mg/L
The Flood Inundation Model III (FIIMIII) was used to study the potential critical flow volumes of the River Murray for Reedy Creek wetland. The wetland proved to be fairly well contained within its boundaries only establishing an overflow past the sheet pile structure when flow at the border surpassed approximately 58 GL/day at the South Australian border, see Map 5. Drying the west end of the wetland would at this flow level no longer be possible. 18
Reedy Creek Wetland Management Plan 2006
Map 5: FIM III flow volume to surpass sheet pile structure
Groundwater The baseline survey installed two groundwater wells within Reedy Creek wetland. These wells were monitored 4 times during the survey period, see Table 1 (27th May, 12th August, 13th October and 30th November 2005). A further 4 sites existed around Reedy Creek wetland, they were monitored once on the 13th of October 2005 (AWE 2006). The locations of the wells are presented in Table 7 and a map of the groundwater flow direction in Appendix D. Table 7: Groundwater monitoring locations Baseline Name
Easting
Northing
Elevation of Bore Hole casing (m AHD)
Ground Elevation (m AHD)
REE – GR 01
341828
6130953
1.202
0.44
REE – GR 02
341432
6131386
-0.22
-0.769
REEGW07
340033
6131108
4.049**
2.659 (2.5*)
1.39
near gauge board
Site B
REEGW03
338227
6132324
6.143**
4.843
1.3
near bridge
Site C
REEGW04
339079
6132942
6.326**
5.106
1.22
side road
Howie 2
REEGW06
340368
6132054
2.979**
1.809 (1.57*)
1.17
neck of wetland
TEP 2504
REEGW01
338925
6132154
4.87
3.53
1.34
Site A
Site D
Bore Name (Obswell)
Howie 1
New Name
REEGW02 TEP 2506
REEGW05
Casing Height (m) 0.762** 0.549**
1.09 340195
6132078
3.17
1.99
Description
near Julie's
1.18
Wetland Marker REES 1 Source: Adapted from Frears (2001) and River Murray Wetlands Baseline Survey – 2005 (AWE 2006) * Ground Elevation in Obswell ** calculated
19
Reedy Creek Wetland Management Plan 2006
From the two piezometers monitored regularly by the baseline survey team, the groundwater seems to flow from the river and wetland towards the Basby floodplain, see Appendix D, although some seasonal impact may be present. More thorough groundwater monitoring is required to get a clear picture of the groundwater flow around Reedy Creek wetland. The groundwater was generally one meter below the river and wetland levels. The piezometer closest to the river seemed to follow the increase in river level in winter, the second piezometer less so. During spring the groundwater levels at both baseline survey installed piezometers declined although the river remained the same suggesting some seasonal impact (AWE 2006). The measured depths of the ground water can be seen in Table 8. More recent groundwater monitoring has show the groundwater to be lower than seen in during the baseline survey with increased salinity, this could indicate a reduced recharge due to the low rainfall seen in 2006 leading to increased salinity in the remaining groundwater. Table 8: Groundwater monitoring results Baseline Name
New Name
REE – GR - 01
Site B
Site C
Site D
Wetland Marker REES 1
Groundwater Depth Groundwater Depth Groundwater (mbgl) (mBTOC) elevation (mAHD) Conductivity μS/cm
27/05/05
1.076
1.838
-0.636
5,050
12/08/05
0.533
1.295
-0.093
5,130
13/10/05
0.518
1.280
-0.078
3,190
30/11/05
0.753
1.515
-0.313
4,050
27/05/05
0.487
1.036
-1.256
18,500
12/08/05
0.451
1.000
-1.220
18,610
13/10/05
0.332
0.881
-1.101
11,220
30/11/05
0.466
1.015
-1.235
14,580
13/10/05
1.31
2.700
1.349
12,240
06/08/06
1.56
2.95
0.94
30,800
13/10/05
0.75
2.050
4.093
8,610
06/08/06
1.2
2.5
3.643
14,760
13/10/05
1.611
2.831
3.495
5,750
06/08/06
2.78
4
2.326
10,990
13/10/05
0.022
1.192
1.787
9,580
06/08/06
0.53
1.7
1.04
16,950
REEGW01
06/08/06
1.8
3.14
1.73
9,690
REEGW02
06/08/06
0.74
1.83
REEGW05
06/08/06
1.05
2.23
REE – GR - 02
Site A
Sampling Date
REEGW07
REEGW03
REEGW04
REEGW06
12/08/05
0.74
13/10/05
0.745
30/11/05
0.795
40,200 0.94
27,500
Source: River Murray Wetlands Baseline Survey – 2005 (AWE 2006)
The groundwater salinity at the piezometer close to the river reach a conductivity of around 5000 μS/cm decreasing over the winter period when the groundwater flow seemed to come from the river and wetland see Table 8. This pattern was also seen in the second piezometer although the salinity of the groundwater at this location reached a high of 18,610. The baseline survey does not assume a great risk of groundwater salininisation due to the permanence and size of the wetland. It does however recommend continued monitoring and comparison to river and wetland levels as well as climatic data (AWE 2006). Groundwater monitoring by Frears (2001) was based at the western end of the wetland using the „existing‟ piezometers. Observations by Frears (2001) indicate that the groundwater flows from the surrounding area towards the wetland. Further, the salinity of the groundwater increased with the proximity to the wetland. 20
Reedy Creek Wetland Management Plan 2006
2.4
ECOLOGICAL FEATURES
(a) FLORA Vegetation surveys were conducted to some extent as part of sand mining data collection and can be found in reports by Thomas (Thomas 1973b), Douglas (Douglas 1974) and Cox (Cox 1975). A significant and aesthetic river red gum Eucalyptus camaldulensis stand close to the sand mining area is described in these historical records. Areas of lignum and samphire are described with the samphire covering the claypans and frequently flooded areas (Cox 1975). Cox (Cox 1975) also describes the abundance of reeds around the creek and backwater areas. A more recent survey was conducted by the baseline survey in 2005. The baseline survey identified 31 native species within the survey area and 22 exotics (SARDI Aquatic Sciences 2006b); see Appendix E. Although the western edge of the wetland was grazed by cattle a species rich assemblage of native grasses was found. This area had the highest species richness but also showed some damage through pugging. Fencing off this area should be monitored for exotic species that may have been suppressed during grazing (SARDI Aquatic Sciences 2006b). The baseline survey suggested the use of this area for crash grazing control trials. Of significant interest is the low abundance of submerged macrophytes. As Reedy Creek wetland is a shallow wetland a greater abundance were expected. There was however, one area in the northeastern corner of the wetland where submerged species were recorded by the baseline survey. These submerged species included Potamogeton crispus and Vallisinera spiralis (SARDI Aquatic Sciences 2006b). Consequently, this area should be protected to maintain some of the submerged species in the wetland (SARDI Aquatic Sciences 2006b). Ruppia and myriophyllum were found in a pool in the Reedy Creek delta into the wetland and charaphytes were found close to the structure; see Table 5 for GPS locations. The red gum Eucalyptus camadulensis var. camadulensis health was found to be excellent to good. Most of these red gums were to be found along the levees the one between the river and the wetland and other between the wetland and the irrigated pastures (SARDI Aquatic Sciences 2006b). The red gum locations and health score can be seen in Appendix E. Large woody debris (LWD) covered less than 5% of the wetland and its shore (SARDI Aquatic Sciences 2006b).This could be of some significance to fish habitat availability in the wetland. However, perhaps some habitat is provided through the Typha sp. and Schoenoplectus validus dominated areas found in the central and eastern end of the wetland, which extends into the connecting channel between the wetland and the River Murray. Lignum Muehlenbeckia florulenta was found on the northern and southern shorelines of the wetland in areas where there were no levees. The majority of exotic species were recorded on the levee between the wetland and irrigated pasture (SARDI Aquatic Sciences 2006b). These species included; Brome spp. Ward's Weed Carrichtera annua Salvation Jane Echium plantagineum False Caper Euphorbia terracina Bastard's Fumitory Fumaria bastardii Wild Lettuce Lactuca saligna Rye grass Lolium sp. Lippia Phyla canescens (which has a potential to spread and become a serious weed) The baseline survey monitoring team surveyed eight plant associations at Reedy Creek wetland (SARDI Aquatic Sciences 2006b). These associations are listed below and their location can be seen in Appendix B. 21
Reedy Creek Wetland Management Plan 2006
1. Diverse grazed shoreline at western edge of wetland 2. Muehlenbeckia florulenta shrubland 3. Typha sp. sedgeland in central part of wetland 4. Schoenoplectus validus sedgeland in central part of wetland 5. Phragmites australis grassland in eastern part of wetland 6. Typha sp. sedgeland in eastern part of wetland 7. Salix babylonica woodland in eastern part of wetland, 8. Schoenoplectus validus sedgeland in eastern part of wetland. A detailed list of species found within the plant associations can be found in Appendix F. A long history of vegetation clearing exists for the Reedy Creek area. Thomas (Thomas 1973b) discusses the clearing of vegetation for grazing and cultivation following settlement in 1870. At the time of his survey there was little remnant vegetation remaining in the Reedy Creek area with only a few pines and mallee (Thomas 1973b). Further clearing mentioned included cutting down of trees for feed during drought, logging and for use in mine smelting fires. The report includes a flora list of “large and obvious” native species. This list included an extended area outside the wetland zone considered in this plan. This list is therefore not considered in this plan but may be of interest to conservationists working in the area and is therefore included in Appendix F. A second list that covers the red gum flats, creek bank, and streambed where sand mining occurred is also included in Appendix F. These lists may be relevant for future vegetation surveys and revegetation efforts. Frears (2001) conducted seed and egg bank experiments, where sediments taken from different areas of the wetland depending on the salinity gradient (fresher closer to the river), were dried out and re-flooded. The sediments from the western end of the wetland (i.e. the area which is to be dried-out) had a greater abundance of seedlings that germinated during the experiment, yet slightly less diversity (11 diff species, compared to 15 further up the wetland, and 14 near the river). Many of the species that germinated were not recorded in the veg surveys undertaken at the same sites. Ostracods, chironomids and collembolla were some of the many invertebrates that hatched out of the sediments after re-flooding. There was no difference between sites. (b) FAUNA Historical records exist listing a number of species that were found in and around the wetland. Some of these records have been used in the individual sections below. However, other species that are of interest and were not covered by any aspect of the recent baseline survey include, longnecked tortoises (common around most areas of water and creek), shingle backed lizards, common brown snake, tiger snake, platypus, native water-rat and historical reports of the common wombat. These wombats were reportedly found in burrows in the surrounding limestone (Cox 1975). The most recent fauna survey was undertaken as part of the River Murray Wetlands Baseline Survey - 2005 (SKM 2006b). Individual teams with appropriate expertise conducted a number of surveys on fauna in the wetland environment. These surveys are described below. Birds There is a long history of bird monitoring at Reedy Creek wetland. From 1969 through to 1975 Cox (Cox 1973; Cox 1974; Cox 1975) recorded sightings at Reedy Creek both at the wetland and the waterfall area further upstream. Cox (1975) gives a description of the habitat use by different birds and updates the bird count from the previous year. Some of the requirements include still-water and reeds for breeding by grebes, shallow clear backwater for herons and egrets and muddy shallow areas for ibis and spoonbills for foraging, waders the shallow mud of the western end of the wetland, and duck, swans, crakes and moorhens require the shelter of fringing vegetation for breeding (Cox 1975). Most of the birds of prey require red gums for breeding however, the swamp 22
Reedy Creek Wetland Management Plan 2006
harrier requires reeds to breed in (Cox 1975). These birds of prey hunt over the floodplain and may even have a significant impact on the rabbit population (Cox 1975). Terrestrial and perching birds were also found to use the area in great abundances due to the varied habitat available, including trees, lignum, samphire and reeds (Cox 1975). Further monitoring was conducted at the conservation park through the 1990‟s. The baseline survey also included bird monitoring at the wetland, which was undertaken by the consultants EBS & HydroTas (2006). The wetland itself therefore has baseline data almost 4 decades apart allowing for a long-term assessment of birds using the area. The wetland is recognised as an important waterbird habitat with Thomas (1973a) describing it as the most valuable aspect of the wetland. Cox (Cox 1975) echoes this sentiment describing the implications of the loss of this central „nucleus‟ to birds in the entire region. Thomas describes large clumps of common reed Phragmites australias in the wetland which provides shelter for ducks and waterhens. Thomas‟s report recommended the declaration of Reedy Creek wetland as a conservation park. The site was also mentioned for its importance for JAMBA (Japan Australia Migratory Birds Agreement) and CAMBA (China Australia Migratory Bird Agreement), protected migratory species in the Australian Heritage Database and Australian Heritage Places Inventory (2006a; 2006b). As part of the Heritage listing the area around the wetland is described as offering breeding and foraging habitat for numerous terrestrial birds and waterbirds, with clumps of reeds described as providing shelter for ducks and water hens, this information was probably obtained from the report by Thomas (1973a) mentioned previously. The bird assessment of the baseline survey was located at four fixed area search sites and one transect (EBS & HydroTas 2006). The surveys were undertaken twice in the baseline survey period, once in autumn and once in spring. All sites were at the western end of the wetland around the samphire area of the creek delta and were considered simple (see Table 24 in Appendix F and Appendix B). The water level increased for the second survey minimising the availability of wet mud and covering some of the low vegetation (EBS & HydroTas 2006). The baseline survey observed a total of 37 waterbird species with a total of 42 species. All the species observed by the baseline survey has been observed by J. B. Cox who recorded a total of 158 species with 51 seen to be breeding (to 1975) (Cox 1975). Of the 148 birds recorded by 1974 (Cox 1974), 15 species are listed in JAMBA and 14 species in CAMBA, of these the baseline survey observed only 3 species, see Appendix F. Ten of the observed species are regarded as threatened or vulnerable species in South Australia with 21 recommended for protection (DEH 2003). The baseline survey found the abundance of birds using the wetland to remain relatively constant at 346 birds in autumn and 341 in spring. The difference in the habitat availability was a reduction in wet mud and an increase in water level for the spring survey. The most significant habitat use by birds at the wetland is shown in Table 9 a list with the habitat use of all baseline survey recorded birds at the wetland and the observed activity can be seen in Appendix F. Table 9: Most significant habitat use at Reedy Creek wetland Habitat
Individuals
Number of Species
Open water
262
14
Samphire
140
Mud
108
10
Lignum
8
Shallow water
8
The three most abundant birds observed were the Grey Teal with 206 individuals, the Australian Pelican with 73 individuals and the Straw Necked Ibis with 58 individuals only observed in the spring monitoring period (EBS & HydroTas 2006). The baseline survey observed 15 species that were roosting and 30 foraging, see Appendix F. The baseline survey noted the Australasian Shoveler as a species of state conservation significance, classified as rare. From its habitat 23
Reedy Creek Wetland Management Plan 2006
requirements their recommendations suggested maintaining an open water habitat during the dryer months, i.e. Autumn, as that was the season the bird was observed at the wetland. Frogs A frog survey was included in the baseline survey with four separate monitoring dates, these frog surveys were conducted by SA MDB NRM Board staff (SA MDB NRMB 2006). There were two sites one at the western end of the wetland and the other at a permanent pool of Reedy Creek near the waterfalls, the locations of which can be seen in Appendix B. Site 1 consisted of damp samphire and lignum close to open water, site 2 consisted of a deep creek habitat with mature red gums and common reed. Four frog species were recorded at Reedy Creek during the survey, which are listed in Table 10. Most species were recorded in the late winter and spring sampling periods. Of the recorded species the Eastern banjo frog Limnodynastes dumerilii and the spotted grass frog L. tasmaniensis were the most abundant, they were also recorded at another 19 wetlands out of the 22 surveyed (SA MDB NRMB 2006). All of the recorded frogs are common throughout South Australia and have been continuously the four most significantly recorded species in the frog census run by the South Australian EPA (Environmental Protection Agency) (Walker et al. 1999; Walker et al. 2000; Walker and Goonan 2001; Walker 2002; Walker 2003). The brown tree frog was probably absent from the western end of the wetland due to the absence of mature red gums, the remaining three frogs are highly adaptable using strategies such as burrowing (L. dumerilii) and being highly mobile and therefore a colonising species (L. tasmaniensis). Table 10: Frogs recorded at Reedy Creek wetland Date
Site 1 (western end of wetland)
Site 2 (Permanent pool of Reedy Creek near waterfalls)
Common froglet
Spotted grass frog
Eastern frog
Crinia signifera
Limnodynastes tasmaniensis
Limnodynastes dumerili
14/03/05
One
25/05/05
Few
31/08/05
Lots
Few
02/11/05
Few
Few
banjo
Common froglet
Spotted grass frog
Eastern frog
banjo
Brown tree frog
Crinia signifera
Limnodynastes tasmaniensis
Limnodynastes dumerili
Litoria ewingi
Few
Few
Few
Few
Many
One Lots Few
Few
Abundance: One = 1, Few = 2 - 9, Many = 10 - 50, lots = >50 Source: River Murray Wetlands Baseline Survey – 2005 (SA MDB NRMB 2006)
Site 2 had a greater abundance and diversity. The pugged ground and the lack of suitable habitat around the samphire region of the western end could account for some of the lower numbers of frogs. The baseline survey recommends fencing of the wetland to restrict stock access and thereby allow an increase in fringing vegetation such as sedges and rushes. This would increase habitat availability and therefore potentially frog abundance (SA MDB NRMB 2006). Fish The baseline survey included a fish survey at Reedy Creek wetland by SARDI Aquatic Sciences (2006a), once in autumn and once in spring. The species collected are shown in Appendix F. Overall the native to exotic species ratio was 3.7:1. However, the abundance of exotic fish brings the ratio of the number of native fish to exotic to 1.8:1 (839 native and 448 exotic). Most of the exotics (326) were eastern gambusia Gambusia holbrooki caught in the autumn survey. There were 104 carp Cyprinus carpio caught with many seen migrating upstream to the waterfall area of the wetland where they spawned (SARDI Aquatic Sciences 2006a). Preventing carp access in spring might have an impact on this migration, however the carp screens and sheet pile structure are currently believed to be too low allowing water overflow and carp migration in spring. The most abundant native species were the bony herring Nematalosa erebi with 230 individuals, flathead 24
Reedy Creek Wetland Management Plan 2006
gudgeon Philypnodon grandiceps with 194 and Australian smelt Retropina semoni with 141 (SARDI Aquatic Sciences 2006a). Of the native fish the dwarf-flathead gudgeon Philypnodon sp. and Murray rainbowfish Melanotaenia fluviatilis are a significant catch in that they are both proposed to be listed as threatened (rare) under the revised National Parks and Wildlife Act 1972 (DEH 2003). There was an indication of seasonal fish movement in ant out of the wetland along with some fish recruitment in or close to the wetland (SARDI Aquatic Sciences 2006a). Flow control structures can have an impact on the movement of fish in and out of wetland environments, due to changes in water quality and/or water flow (velocities, turbulence) (see Your Wetland: Supporting Information (Tucker et al. 2002)), however the sheet pile structure may not have the full impact that the traditional culverts have. In the case of Reedy Creek the reduction of movement of large fish may be of a minor consequence as only a few native fish can tolerate the salinity (>10,000 EC) of the refuge pools of the creek. The fish that can tolerate this level are flathead gudgeons P. grandiceps and carp gudgeons Hypseleotris spp. which were found in large numbers. Macroinvertebrates The River Murray Wetlands Baseline Survey - 2005 (SKM 2006a) monitored macroinvertebrates at Reedy Creek wetland in autumn and spring. Reedy Creek wetland had an above average taxa richness with 43 in Reedy Creek, 37.3 the average for the geographical zone and 34.3 the average for the baseline survey 2005 surveyed wetlands (SKM 2006a). However, the abundance at Reedy Creek wetland was seen to be low, the full list of taxa and abundance can be seen in Appendix F. The baseline survey related the low abundance to the low availability of habitat such as submerged and emergent vegetation. Of the taxa found at the wetland the most abundant were those that were most widely distributed and may not have been impacted on as much by the lack of habitat (SKM 2006a). The argument for the lack of habitat is supported by the baseline survey findings of an increased abundance following the increased water levels in the wetland in spring, which flooded surrounding fringing vegetation increasing submerged habitat diversity and availability. The most pollution sensitive taxa were dependent on or prefer slow flowing or still waters, these taxa being, Eusiridae (order Amphipoda), class Acarina (freshwater mites) and Leptoceridae (stick caddis) (SKM 2006a). For a description of the function of macroinvertebrates in wetlands refer to Your Wetland: Supporting Information (Tucker et al. 2002).
2.5
IMPLICATIONS FOR MANAGEMENT
The River Murray Wetlands Baseline Survey - 2005 (SKM 2006b) had a number of recommendations to make for improved management of the wetland. The recommendations were based on each survey team‟s assessment of their collected data and have been summarised below. The turbidity of the wetland seems to be localised in the western end as the creek itself is clear and the wetland has an increasing turbidity the further it is from the connection to the River Murray. This turbidity is probably due to the wind resuspension of sediment facilitated by the lack of vegetation (both terrestrial and aquatic) and the shallow nature of the wetland at the western end. Focusing on revegetation and inducing germination in this area would potentially provide the greatest benefit for water quality and fauna habitat. Drying this wetland section and thereby compacting the sediment may also contribute to reducing the sediment resuspension thereby reducing the turbidity at this end of the wetland. The only management suggestions made by the baseline survey regarding freshwater was to increase the flushing of the wetland, and to observe the impact of saline water inflows for Reedy Creek. The groundwater team recommend continued monitoring and comparison to river and wetland levels as well as climatic data, this monitoring can be assisted with the use of a data logger (AWE 2006). 25
Reedy Creek Wetland Management Plan 2006
From the physical features of this wetland the following management recommendation, from Frears (2001), and considerations can be adopted; Introduce a dry period in the saline west end of the wetland (not the open water for fear of salinisation of this freshwater area) by closing the sheet pile structure. Introduction of managed dry periods in the west end of the wetland needs to consider the feasibility of actually achieving a dry state, given the ephemeral nature of Reedy Creek that flows into this end of the wetland. Due to the Mount Lofty Ranges winter rainfall pattern, a dry period extending into winter would therefore not be possible. Monitor groundwater inflows into the hydrologically managed section of the wetland to observe the impact of groundwater prior to, during and following a drying event Monitor impact of the altered hydrology regime on wetland salinity, water quality, vegetation germination, fish and macroinvertebrate population and water pH. From the ecological features of the wetland observed during monitoring, both baseline and from previous records, understanding could be elucidated as to the current degradation of the wetland as well as potential restoration actions, existing and potential threats. Each team of the baseline survey made recommendations to management based on their data and expertise, these are presented and discussed below. The recommendations from the vegetation team of the baseline survey (SARDI Aquatic Sciences 2006b) included; Protection of submerged macrophytes Grazing trials to be considered in the future for currently grazed area, i.e. fencing to control/manage stock access Willow control is recommended on the levee between the wetland and the river Agricultural weed removal recommended for the levee between the wetland and irrigated pasture The recommendations made by the baseline survey bird team (EBS & HydroTas 2006) include; For birds maintain open water habitat in autumn to provide refuge when other wetlands would be dry. Described as being of particular significance to the Australasian Shoveler. Further research would be needed to validate the claim. Need to promote submerged aquatic vegetation that will be beneficial to waterbird species, increase in abundance of observed species. Ephemeral lagoons should be maintained as such to make sure wet mud, shallow water and open water is maintained. Removal of stock should increase the habitat quality for water birds. Fix sheet-piling structure to allow water level fluctuations to increase abundance and diversity of wader species utilising wetland. The recommendation from frog team of the baseline survey (SA MDB NRMB 2006) include; Fence off western wetland area to restrict stock access and thereby improve fringing vegetation. Site to be included in the annual South Australian Frog Census (LAP, community group or landholders) Frogs to be monitored at least twice a year (assistance from local Wetland Project Officer) more sites to be included particularly close to the River Murray 26
Reedy Creek Wetland Management Plan 2006
The recommendation from the fish team of the baseline survey (SARDI Aquatic Sciences 2006a) include; Removal of stock to minimise riparian and littoral zone degradation Revegetation of streamside vegetation Limit carp migration upstream to Reedy Creek waterfall area in spring No concrete recommendations were made by the macroinvertebrate team (SKM 2006a). However, a number of issues were recognised by the team that affected the habitat availability for macroinvertebrates. Based on the information contained in the macroinvertebrate chapter of the baseline survey the following management considerations seem prudent; Increase the reeds in an attempt to increase the aquatic vegetation (historical anecdotes point to there having been more reeds in the wetland) Increased structural woody habitat (SWH) could possibly also add to the habitat availability in the wetland Reedy Creek wetland seems to be recognised for its importance in providing water bird habitat. This fact and the recommendations made by the baseline survey teams suggest the key management considerations for Reedy Creek wetland should focus on maintaining the habitat availability for water birds. As waterbirds are at the top of the wetland food chain, the lower food chain must be in tact and be capable to supporting the number of waterbirds expected. Therefore, to help the waterbirds the wetland ecosystem must be in a healthy stable and productive state. Restoration of this wetland must therefore focus on the establishment of habitat, the lack of which has been identified as a major degradation, as well as protecting that habitat. Habitat must therefore be developed and maintained for macroinvertebrates, fish and frogs through the protection of the samphire and herbland, and the establishment or expansion of reed beds. With the development of more habitat (submerged, emergent, woody debris, variable depths) the identified macroinvertebrates indicate the potential for an increase in diversity and abundance at this wetland, particularly given the freshwater status at present (Goonan 2006). The approach normally undertaken to reinvigorate seed germination, i.e. drying and then rewetting a wetland, is in the case of Reedy Creek wetland not an option for the complete wetland as there is a potential of salinising the wetland. There is however, the option of drying the Reedy Creek delta during the late summer months prior to winter rains. This structure could then also be used to restrict carp movement in the following spring. Other management options for the wetland include the control of stock, management of weeds, and the replanting of fringing vegetation. The management of stock was repeatedly mentioned in the baseline survey as well as other historical reports (Thomas 1973a; Jensen et al. 1999; Frears 2001). As the currently grazed area has a high diversity of vegetation, potentially facilitated through disturbance caused by stock, a crash grazing regime will need to be trialled (SARDI Aquatic Sciences 2006b). The replanting of reed clumps as in the historical anecdotal records could increase the macrophyte, fish and bird habitat availability at the western end of the wetland where no reeds currently exists. These reeds may assist in reducing the turbidity of the wetland and promote some submerged macrophyte expansion.
27
Reedy Creek Wetland Management Plan 2006
Chapter 3.
SOCIAL ECONOMIC AND CULTURAL VALUES
The area surrounding Reedy Creek was the traditional lands of the Peramangk. The area offered good water supply, food and the granitic rock provided shelter. Therefore, permanent camps were established in the area. Evidence exists in the form of rock paintings and extensive middens (McBriar and Milnes 1968; Thomas 1973b). Thomas (1973b) discusses anecdotal information from a Mr Kowald, who grew up in the area, of remembering an Aboriginal camp in the granite borders above Reedy Creek. Aboriginal consultation on management issues was conducted by Wetland Care Australia. No specific concerns were raised although there was general concern over the decline in vegetation, birds, yabbies and fish (Jensen et al. 1999). In a questionnaire to landholders, organised by Wetland Care Australia for their Reedy Creek management plan, Arthur Hein recorded observations of the area prior to the 1940‟s permanent inundation of the wetland. This anecdotal information mentions lignum of 2 to 3 m tall, saltbush in the samphire clay pans, dense reed beds areas up to 3 m tall with some approx 2 hectares in size (see Map 1), no reeds in the creek and interestingly water grasses and duck weed in most areas, something which is not found today (Heine 1999). Heine also recorded prolific water birds many nesting in tall reed beds and some of the fish seen in the wetland included, callop, silver perch and small native species. He further observes that the cumbungi is all but gone following the raising of the river level as well as a reduction in waterfowl as a consequence.
28
Reedy Creek Wetland Management Plan 2006
Chapter 4. LAND TENURE, MANAGEMENT ARRANGEMENTS
JURISDICTION
AND
There are multiple properties, which encompass Reedy Creek wetland and the surrounding land. The wetland lagoon itself covers thirteen of these properties, eleven in private ownership, and two, covering the wide opening between the wetland and the river, in Mid Murray Council ownership. Some of the surrounding properties are residential (shacks) although most of the area is still in primary production including animal husbandry. The property boundaries and the key ownership details can be seen in Map 6.
Map 6: Cadastral boundaries covering Reedy Creek wetland and surrounds.
The Reedy Creek community members i.e. the Caloote Landcare Group, with support from the Mannum to Wellington LAP and the SA MDB NRM BOARD will be responsible for the management of the wetland in consultation with the neighbouring landholders. Contact persons for Reedy Creek wetland management will be Mannum to Wellington LAP Officers, Wetland Management Planning Officer or SA MDB NRM BOARD Wetland Project Officer, see
29
Reedy Creek Wetland Management Plan 2006
Table 11 for contact details. Access to the wetland will need to be arranged through consultation with the relevant landowner, contact with whom should be established through the Mannum to Wellington LAP.
30
Reedy Creek Wetland Management Plan 2006 Table 11: Reedy Creek wetland responsible positions contact details Position
Present Officers
Organisation
Mailing Address
Mannum to Wellington LAP Project Manager
Kathryn Rothe
Mannum to Wellington LAP PO Box 2056
Wetland Project Officer, Lower Murray
Adrienne Frears SA MDB NRM BOARD
PO Box 2056
Wetland Management Planning Officer
Tumi Bjornsson Lower LAPS
Phone number Murray Bridge
SA 5253
(08) 8531 3222
Murray Bridge
SA 5253
(08) 8232 6753
Mt. Lofty Ranges Mount Catchment Centre Barker Upper Level Cnr. Mann and Walker St's
SA 5251
(08) 8391 7515
31
Reedy Creek Wetland Management Plan 2006
Chapter 5. THREATS AND POTENTIAL SOLUTIONS TO REEDY CREEK WETLAND There are a number of existing and potential threats to Reedy Creek wetland, some of which have become apparent in the description of the wetland and available data in the chapters above. The identification of these threats is essential for appropriate adaptive management of the wetland. Their early recognition allows for an appropriate monitoring strategy for early identification of adverse impacts of management and therefore rapid response through altered management. The major threats include stock access to sensitive wetland fringing vegetation, lack of aquatic habitat such as submerged and emergent vegetation, pest species such as carp and rabbits and potential groundwater salinity from upland areas. The past clearing of the wetland area has degraded the native habitat throughout the area and willows cover a large section of the causeway between the wetland and the river. Some management interventions may be able to address some of these threats however, the altered management of a wetland will in itself bring with it potential threats that need to be identified, these and other threats identified so far have been listed in Table 12.
32
Reedy Creek Wetland Management Plan 2006 Table 12: Existing and potential threats to Reedy Creek wetland CAUSE
IMPACT
CATEGOR Y
EXTENT (IF KNOWN)
POTENTIAL SOLUTION
Needs to be tested for
Saline water and groundwater
Sulfuric acid release following drying event Severe ecological degradation, including fish kills and degradation of vegetation
Local
Wetland and Reedy Creek
Saline wetland
Mainly salt tolerant fish species caught in wetland
Saline water from Reedy Creek Saline groundwater intrusion
Reduction in potential native fish diversity
Local/ Regional
Wetland and Reedy Creek
Only possible to minimise future increase by minimising the drying events at the wetland
Salinisation of the wetland if extensive and frequent dry periods are introduced
Increasing EC of wetland water body Increasing salinity in wetland base/soil
Wetland
Use minimal dry events to induce germination of water plants Monitor groundwater flow around wetland to assess the impact and respond adaptively Do not allow wetland to remain dry more than 6 months
Local/ Regional
Levee bank
Follow expert recommendation on willow control Revegetate with appropriate native species
Water bypasses the structure at lower ground near levee (embankment)
Loss of bank stability Undercutting Slumping Loss of levee sections Greater link between wetland and river West end of wetland does not dry
Degradation of wetland water quality (long term degradation of wetland) Degradation of wetland environment Reduced biodiversity Degradation of habitat quality for native fish Degradation of bird habitat (increased fish and macroinivertebrates may improve habitat for water birds) Only salt tolerant species present Salt inflow into river Loss of levee Greater exchange between river and wetland Unknown consequences to wetland ecosystem Potential reduction of still waters Dry management regime not possible
Local
Erosion of levee bank between wetland and river
Drying of main part of wetland Saline seepage from groundwater Frequent drying of western end allowing excessive inflow of saline groundwater into wetland Wetland maintained at a dry phase for too long allowing groundwater seepage into the wetland Inappropriate willow control
Local
Land surrounding embankmen t & structure
Survey Prop up with fill (extend embankment) and re revegetate to prevent erosion
Potential
Existing
Potential
Potential Acid Sulphate Soils
Potential
ABIOTIC
SYMPTOM
Potential
THREATS
Ground too low for water levels expected
Not to introduce dry periods
33
Reedy Creek Wetland Management Plan 2006 THREATS
CATEGOR Y
Loss of habitat diversity and abundance (vegetation etc.) Loss of structural woody habitat (snags) in water body Loss of windbreak
Local
Rabbits
Less diverse vegetation to what could be expected in area Destruction of current vegetation Destruction of revegetation efforts Pugging Grazing pressure (destruction of existing revegetation) Prevention of vegetation growth
Rabbits eat vegetation
Destruction of riparian vegetation Loss of habitat
Local
Unrestricted stock access to wetland fringe
Grazing pressure destruction of existing revegetation Pugging of drying wetland base Grazing of germinating plants in wetland bed Their presence
Drying of the wetland allowing access to revegetated areas and wetland base
Pugging Erosion Grazing of vegetation (lack of regeneration) Lack of riparian and fringing vegetation Lack of fauna habitat Same as above Destruction of revegetation efforts Compromise of management efforts (undermining drying event)
Degradation of native vegetation
Gradual loss of abundance of birds visiting and breeding in wetland
Degradation of wetland ecosystem Lack of fish and macroinvertebrates as food source Lack of floodplain vegetation (habitat)
Existing
Existing
Clearing Grazing Weed infestation Mismanagement of wetland hydrology
Existing Potential Existing
IMPACT
Less than potential native vegetation species in the area Invasive species present Impact on native fauna species diversity and abundance
Stock (Cattle and sheep)
Existing
CAUSE
Loss of native riparian vegetation
Stock (Cattle and sheep) BIOTIC
SYMPTOM
Weeds
Lack of waterbird habitat
EXTENT (IF KNOWN)
POTENTIAL SOLUTION
Surrounding area. Extensive. Revegetatio n option for riparian area and potentially into the wetland water. Surrounding area
Revegetate with local native species Protect from rabbits
Local
Unfenced surrounding area
Fence off stock Introduce appropriate grazing regime
Local
Embankmen t linking to sheet pile structure
Exotic species Competition with native vegetation Loss of habitat
Local
Floodplain
Active removal poisoning
Loss of bird habitat Reduced numbers of birds using wetland than the potential of the wetland allows
Local/ Regional
Wetland and wetland surrounding area
Monitor bird numbers regularly Restore wetland ecology Increase habitat availability Revegetate
Fence off wetland with rabbit proof fence Baiting Shooting Ripping of burrows
Fence of stock and restrict access while wetland is dry (no point in attempting to dry the wetland if stock has full access to the management area during this period)
34
Reedy Creek Wetland Management Plan 2006 SYMPTOM
Lack of specialist frogs
Lack of specialist frogs
Lack of native fish habitat
Mainly generalist fish in wetland
Potential
Existing
Existing
THREATS
Invasive fish species (carp, gambusia, goldfish and redfin)
Turbid wetlands
CAUSE
IMPACT
CATEGOR Y
Possibly due to lack of suitable habitat Degradation of wetland ecosystem Saline wetland Lack of structural woody habitat
Loss/reduction of frogs in ecosystem
Local
Reduction in available habitat including breeding areas (nurseries)
Local/ Regional
Well known environmental problem in region (large pest population) Rapid breeding cycles (carp ~2/year), live bearing (gambusia), unpalatable eggs (redfin)
Competition for habitat. (domination of available habitat) Predation/aggressive interaction on/with small and young native fish (redfin/gambusia) Damage to aquatic vegetation Decrease in water quality (Turbidity increase) Predation on native fish (redfin)
Local/ Regional (Managed locally)
EXTENT (IF KNOWN) Wetland and wetland surrounding area Wetland and river
Wetland and Reedy Creek
POTENTIAL SOLUTION
Restore wetland ecology/habitat availability Increase habitat availability Revegetate Restore wetland ecology/habitat availability Revegetate riparian vegetation (provide shade and snags) Revegetate reeds (Typha) clumps in areas where anecdotal evidence points to their presence Minimise any potential adverse saline groundwater inflow into the wetland following management Establish height/capacity of structure, improve if necessary and possible Provide habitat to favour native species Restrict carp movement into Reedy Creek in spring using carp (large fish) screens Allow movement of carp out of wetland in late summer to autumn by removing screens Monitor abundance of invasive verses native species Removal of carp following drawdown Removal of carp and juveniles in Reedy Creek pools when levels fall in the ephemeral creek
35
Reedy Creek Wetland Management Plan 2006
Chapter 6.
MANAGEMENT OBJECTIVES
The main management objective is the restoration of the ecology of Reedy Creek wetland. Based on the objectives, presented in Chapter 1, the baseline data presented in Chapter 2 and the threats to the wetland, discussed in Chapter 5, more detailed management objectives can now be developed. The objectives, including solutions, actions needed, and priorities are detailed in Table 13. Adaptive management will drive the actions undertaken to achieve the objectives. Due to the complexity of the habitat requirements of waders, water birds, native fish, macroinvertebrates and frogs and identified potential threats to the wetland the management and therefore detailed objectives will need to be flexible. A minor review of the objectives and the wetland management plan is recommended at the end of each year, community groups can achieve this, with the support of the local wetland officers listed in Chapter 4, by reviewing their monitored data. A major review should follow 5 years after the commencement of the management.
36
Reedy Creek Wetland Management Plan 2006 Table 13: Management objectives for Reedy Creek wetland
VEGETATION
Native
Invasive
Invasive
Native
Native
Native
MANAGEMENT OBJECTIVES
Regeneration of riparian vegetation (surrounding wetland and creek)
FISH
Establish native revegetation projects Work on rabbit control Work on stock control
Regeneration/ maintain wetland aquatic species (maintain/increase abundance of submerged macrophytes)
Maintain open water Minimise wave action Revegetate reeds
Regeneration/maintain wetland aquatic species (maintain water plant communities) in creek delta
Introduce dry period followed by inundation to initiate germination
Control of willows from levee between wetland and river
Establish willow removal projects in the wetland area
Removal of weeds from levee between the wetland and irrigated pasture
Establish weed removal projects in the wetland area
Restore native fish habitat **
Minimise impact of carp
Invasive
SOLUTIONS
ACTIONS (Management (M) or Engineering or structural (ES)) Actively revegetate using locally collected seed Fence of stock from wetland/ establish grazing regime Use rabbit control measures as appropriate Revegetate with reeds in shallow areas Revegetate riparian zone
Slow drying of wetland Monitor water levels and salinity and respond adaptively to maintain shallow water and mud flats and EC of around 5000 Willow control as per expert recommendation (Natural State have extensive experience in willow control in wetland of the area) Weed control as per expert recommendation
Improved fish habitat
Restore riparian vegetation Increase structural woody habitat
Improve capacity of structure Operate carp grills at sheet pile structure based on expert recommendation
Make sure structure is high enough (See chapter 7.2) Extend carp screens Dry west part of wetland Install screens in mid Aug remove in mid Dec. (Smith 2006)
QUANTIFIABLE /MEASURE OF ACHIEVEMENT Expansion and survival of native species (numbers based on expert recommendation) Minimisation of stock induced vegetation degradation Diversity of aquatic species, continued presence of submerged species (Potamogeton crispus and Vallisinera spiralis) Expansion of fringing reeds Diversity of aquatic species, continued presence of submerged species (Ruppia in pond, myriophyllum in Reedy Creek channel) Control of willows (as per expert recommendation) Willow control to be cautious of erosion issues Reduction of weeds (as per expert recommendation)
Increase in abundance of specialist native species Increase in macroinvertebrate abundance (food for fish) Minimal carp recruitment Far less carp in western end of wetland and in creek
MONITOR (TIMING)*
LEGISLATION
PRIORITY
Photo point (Q) Vegetation survey
Medium
Photo point (Q) Vegetation survey
Medium
(Y)
(Y) Monitor water quality (M)
Photo point (Q) Vegetation survey
WAP (water license)
High
(Y) Monitor water quality (M) Vegetation survey
High
Vegetation survey
High
(Y)
(Y)
Fish survey (Y) Macroinvertebrate survey (1/2Y)
Medium
Fish survey (spring/summer)
High
37
Native Native/Migratory
Restore native frog habitat
Improved frog habitat through improved and more diverse ecological niches (habitat)
Restore riparian vegetation (revegetate) Increase reed growth/plant
Presence of specialist native frog species in wetland
Frog survey (1/2Y)
Low
Maintained/Improved habitat for water birds (waterfowl, waders and shorebirds)
Maintain all habitat including open water, shallow water, wet and dry mud Revegetate surrounding area with native vegetation
Maintain/Increase bird abundance and diversity using wetland Increase in habitat diversity (fringing vegetation)
Bird survey (1/2Y) Vegetation survey
High
(Y)
Maintain open water habitat in autumn as refuge
Do not alter hydrology of (dry) larger wetland basin
Monitor for presence of waterbirds (particularly Australasian shoveler)
Bird survey (1/2Y) Observation of water levels
Low
Minimise groundwater impact on wetland
Keep wetland inundated Only dry out western part occasionally (1 in 5 years)
Restoration of wetland habitat for native fish species and macroinvertebrates through revegetation of aquatic and riparian plant species Revegetate as per expert recommendation Avoid impacting on open water regime (no action needed) Review waterbirds requirements at 5 year review (particularly Australasian shoveler) Monitor effect of restored hydrology and adapt management accordingly
Monitor water quality (M) Monitor ground water (Q)
High
Turbidity
Expand reeds in wetland to minimise resuspension of sediment
Revegetate riparian vegetation Revegetate reeds
Monitor water quality (M) Observation
Low
Manage stock access
Fence off wetland Control stock access (trial crash grazing to maintain vegetation diversity in currently grazed area)
Construct fence (ES) Develop grazing management plan (M)
Test effectiveness of structure
Install ‘logs’ Dry wetland and observe capacity of structure
Install ‘logs’ with assistance of engineer
Monitor wetland salinity following drying event (no net increase) No increase in groundwater discharge Visibly more clear water Turbidity of wetland water below 100 NTU for 50% of time No loss of diversity in currently grazed areas Less grazing impact (more regeneration, less pugging, less shore erosion and less sediment entering wetland) Increased bird use Increased frog abundance Structure effectively holds water
Find AHD of structure and surrounding lowland to establish potential flow paths
Level in structure and surrounding samphire (lowland) more accurately than baseline survey
Contract in team with differential GPS
Structural Structural
Structural
MANAGEMENT
WQ
GW
BIRDS
FROGS
Reedy Creek Wetland Management Plan 2006
Missing information i.e. structure height in m AHD and surrounding samphire m AHD for potential flow paths
Observation
High
Vegetation survey (Y) Frog monitoring (1/2Y) Bird Monitoring (1/2Y)
Observation
1 time contractor
WAP (water license)
High
High
* WQ, Water Quality; W, Weekly; M, Monthly; Y, Yearly; Q, Quarterly ** Improved and more diverse ecological niches, such as macrophytes (emergent and submerged), snags (therefore need riparian vegetation) and maintenance of open water, as well as more food sources, biofilms, etc. would lead to an increased diversity and abundance of macroinvertebrates and small native fish. These small native fish are prayed upon by larger native fish, both are in turn prayed upon by waterbirds, who also obtain a more diverse habitat though the development of snags, aquatic and riparian vegetation.
38
Reedy Creek Wetland Management Plan 2006
39
Reedy Creek Wetland Management Plan 2006
Chapter 7.
IMPLEMENTATION OF PLAN
The primary focus of the management of Reedy creek is the establishment of habitat for birds, fish, frogs and macroinvertebrates. To achieve this, action needs to focus on the protection of fringing vegetation, i.e. manage stock access to the wetland, the revegetation of the wetland (this could include expanding the reeds), maintain open water habitat, maintain samphire/floodplain habitat and introduce structural woody habitat. To improve habitat weed management, including willows, also needs to be included in the management schedule. Other significant management considerations include the maintenance/management of the sheet pile structure to enable a change in hydraulic regime at the western end of the wetland and the exclusion of carp in spring. Map 7 shows the open water section of Reedy Creek wetland as well as the western end of the wetland that can be dried using the sheet pile structure, this area includes the Reedy Creek delta. This map should provide some understanding of the management potential of Reedy Creek wetland.
Map 7: Open water v’s hydrologically managed sections
The main land use in the surrounding area is grazing, both cattle and sheep. In the past Reedy Creek wetland was fully open to stock access. Some parts of the wetland is now fenced off to exclude stock however, in areas where stock still has full access to the wetland evidence of stock grazing impact was evident during the baseline survey. Therefore, the River Murray Wetlands Baseline Survey – 2005 vegetation, fish, frog and bird teams (EBS & HydroTas 2006; SA MDB NRMB 2006; SARDI Aquatic Sciences 2006b; SARDI Aquatic Sciences 2006a) recommend the exclusion of stock from sensitive areas to promote the value and diversity of natural habitats. As discussed in chapter 2.4 the grazed area has some of the highest vegetation diversity at the wetland potentially due to the grazing of otherwise dominating plans. The vegetation survey therefore recommends a crash grazing trial to maintain the diversity found in the grazed areas (SARDI Aquatic Sciences 2006b) The complete fencing off of stock should be accomplished before the wetland is dried. 40
Reedy Creek Wetland Management Plan 2006
Otherwise, access will be provided for stock onto revegetated and fenced off areas thereby undermining past revegetation efforts. For the structure to be able to function as required in drying the wetland during February to May it must be above the February to May expected highest river levels of 1 m AHD, based on the past 10 years of data obtained from DWLBC (DWLBC 2006b). For the structure to function from December to May it must be above 1.2 m AHD. Otherwise, it will not have the capability to dry out the western end of the wetland during the chosen dry period. The structure or at least the carp screens must also be higher than the August to December expected highest river levels of 1.3 m AHD, based on data obtained from DWLBC (DWLBC 2006b), for it to fulfil the function of excluding carp from the Reedy creek following a drying event. To allow the structure to fulfil the functions described, the surrounding land must also be higher than either of these elevations of 1 m and 1.3 m. If the surrounding land is above 1.3 m AHD the structure can be upgraded as necessary to allow for carp control by mounting screen extensions above the structure. These screen extensions should extend a minimum of 30 cm above the anticipated maximum water level with 50 cm to 1m preferable (Smith 2006). Should the river return to the more fluctuating water levels as seen in Figure 11, where the river exceeded 1 m AHD 4 times during the planed drying period of February to May between 1974 and 2006, the structure and surrounding land may well not be able to effectively block water flow into the western end of the wetland. In such a scenario, management of the wetland and water licensing would have to be adaptive to be able to postpone planed drying and carp restriction to the following year.
River Level at Mannum Feb to May m AHD
1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05
2010
2005
2000
1995
1990
1985
1980
1975
1970
1
Year Figure 11: Years river water levels exceeded 1.3m between 1974 and 2006
7.1
ON GROUND ACTION AND TIMETABLE
Table 14, provides a timetable and prioritisation for the on ground works in the Reedy Creek wetland. The table does not address monitoring which is discussed in Chapter 8. A log of all 41
Reedy Creek Wetland Management Plan 2006
activities undertaken at the wetland should be maintained. This log would assist in the review process of the wetland management plan discussed in Chapter 9. The revegetation of reeds could be attempted at shallow areas in the wetland. This may reintroduce the extensive reed beds mentioned in historical (pre 1940‟s) accounts.
42
Reedy Creek Wetland Management Plan 2006 Table 14: Implementation plan for Reedy Creek wetland
PRIOR TO WETLAND DRYING
ACTIVITY
PRIORITY
Finance
ASAP Prior to any drying event
SA MDB NRM BOARD/LAP (Adrienne Frears, Kathryn Rothe)
Establish elevation of sheet pile structure
High
Finance (differential GPS)
ASAP Prior to any drying event
SA MDB Frears)
NRM
BOARD
(Adrienne
Establish elevation of land surrounding sheet pile structure
High
Finance (differential GPS)
ASAP Prior to any drying event
SA MDB Frears)
NRM
BOARD
(Adrienne
Improve structure as necessary (install screen extenders)
High
Finance
ASAP
LAP (Kathryn Rothe)
Improve structure as necessary (increase height)
High
Finance
ASAP Prior to any drying event
LAP (Kathryn Rothe)
Improve levee bank as necessary (increase height)
High
Finance
ASAP Prior to any drying event
LAP (Kathryn Rothe)
Install Groundwater data logger in piezometer (which piezometer based on expert recommendation)
High
Finance
ASAP Prior to any drying event
SA MDB Frears)
NRM
BOARD
(Adrienne
Install river gauge board
Medium
Finance
ASAP
SA MDB Frears)
NRM
BOARD
(Adrienne
Install permanent photo point
Medium
2 persons 3 hrs Materials and tools (available)
Prior to management actions
SA MDB NRM BOARD/LAP (Adrienne Frears, Kathryn Rothe)
Finance Fencing materials Volunteers Funding
ASAP Prior to any drying event
LAP (Kathryn Rothe)
As appropriate As per expert recommendation
LAP/Community group
Revegetation extensions
OPERATION
RESPONSIBILITY
High
High
Weed removal see chapter 2.4(a)
AS APPROPRIATE
TIMETABLE
Establish acid sulphate soils threat
Fence off stock access to west end of wetland
ANNUAL SCREEN
RESOURCES
(terrestrial)
including
Medium any
levee
bank
High
Funding Seed collection
As appropriate for seed collection and revegetation works As per expert recommendation
LAP/Community group
Revegetation (aquatic) plant reeds in mid and western end of wetland potential locations include shallow areas in the wetland bed
High
Funding Seed collection
As appropriate for seed collection and revegetation works As per expert recommendation
LAP/Community group
Medium
When possible (discuss with relevant expert)
LAP/Community group
ASAP
LAP/landowner
End of each inundation year (End of summer)
Community group with assistance from LAP and SA MDB NRM BOARD
Introduce structural woody habitat (SWH)
Medium
Develop appropriate grazing regime in currently grazed wetland area (area which is to be fenced off)
Medium
Funding Agreement/cooperation by landowner Monitored data
Annual review of monitored data
High
Install fish screens and extenders
High
Fish screens and extenders
Mid August to mid December
Community group with assistance from LAP and SA MDB NRM BOARD
Remove fish screens and extenders
High
Manpower
Mid December to mid August
Community group with assistance from LAP and SA MDB NRM BOARD
43
Reedy Creek Wetland Management Plan 2006
7.2
WETLAND WATER OPERATIONAL PLAN
One of the strongest tool in managing a wetland is the control of the wetland hydrology. Hydrology controls the germination and growth of aquatic and riparian vegetation. The healthy vegetation and appropriate inundation leads to the growth of biofilms, the vegetation and biofilms being a food source for macroinvertebrates and small native fish. The vegetation and appropriate water regime also provide a more diverse habitat for waterbirds and fish. Changing a wetlands‟ hydrology must however take into account potential threats such as saline groundwater inflow. The restoration of the western end of Reedy Creek wetland and the Reedy Creek delta therefore includes the establishment of an infrequent drying regime to induce germination of aquatic and fringing vegetation whilst minimising potential salinisation of the wetland. (a) WATER REGIME Establish a 1 in 5 year drying event. The surrounding groundwater must be monitored frequently at selected piezometers during this time to establish the impact of wetland drying on saline groundwater intrusion to the wetland. Carp screens should be used following this drying event. The wetland cannot dry in winter as winter rain in the Mt. Lofty Ranges feeds Reedy Creek and ultimately the wetland. As discussed above the most appropriate dry periods of the wetland is from February through to May, see Figure 12. However, scheduled dry periods could be washed out with summer flooding as seen in 1992 or through overtopping of the structure. In such a case the drying will be reviewed and reinitiated or postponed as necessary, potentially until the following year.
In s ta ll s to p lo g s
R e m o v e s to p lo g s
~ 0 .7 5 m A H D
S e p te m b e r
O c to b e r
N ovem ber
N o te : C a rp s c re e n s in s ta lle d a n d s e c u re d
D ecem ber
O p e n c o n n e c tio n to riv e r - in u n d a tio n o f w e tla n d
J a n u a ry
F e b ru a ry
S to p lo g s in s ta lle d - w e tla n d d ryin g
M a rc h
D ry w e tla n d
A p ril
M ay
June
~ 0 .7 5 m A H D
J u ly
A ugust
O p e n c o n n e c tio n to riv e r - in u n d a tio n o f w e tla n d
Figure 12: Water regime ‘normal’ managed drying event
Due to the current water shortage and the expected drying of Reedy Creek wetland through this management plan the drying event will be brought forward to assist in minimising water loss in the river. It is not anticipated that extending the dry period for Reedy Creek by two months will have an adverse impact. It is further utilising the opportunity to test the sheet pile structure at the wetland prior to the wetland drying due to an anticipated drop in river levels. Management through drying of Reedy Creek wetland will therefore commence in December of 2006. A fully dry wetland would be expected by March. Drying of the wetland will not be seen as a failure during this management season unless overtopping of the structure extends through to March. The dry period should extend until water from Reedy Creek fills the west end of the wetland. Based on the expected rainfall in the Reedy Creek Catchment area, see Figure 14, the creek would be expected to be flowing by late April to May. Maintaining a dry wetland following this inundation would not be possible. Future drying events should return to the February to May schedule as described above, although a fully dry period may not be possible in such a short time frame achieving only a partial drying of the fringing regions. Volume calculations have been made for 2007 with the extreme dry period, A February to May „normal‟ managed drying event and a wet year. Water license applications will be relevant to the 2007 and wet year calculations. 44
Reedy Creek Wetland Management Plan 2006
In s ta ll s to p lo g s
~ 0 .7 5 m A H D
S e p te m b e r
O c to b e r
R e m o v e s to p lo g s fo llo w in g in u n d a tio n fro m R e e d y C re e k
~ 0 .7 5 m A H D
N o te : C a rp s c re e n s in s ta lle d a n d s e c u re d
Novem ber
Decem ber
O p e n c o n n e c tio n to riv e r - in u n d a tio n o f w e tla n d
J a n u a ry
F e b ru a ry
S to p lo g s in s ta lle d - w e tla n d d ryin g
M a rc h
A p ril
D ry w e tla n d
M ay
June
J u ly
A ugust
O p e n c o n n e c tio n to riv e r - in u n d a tio n o f w e tla n d
Figure 13: Water regime 2007 extreme drying event 120 100 80 60 40 20 0 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Median (5th decile) monthly rainfall - mm
Figure 14: Median monthly rainfall at Mt. Crawford Forest
(b) VOLUME CALCULATIONS Only the western end of the wetland can be manipulated using the sheet pile structure. Therefore, to estimate the volume required for the wetland license only this section will be taken into account. As discussed in Chapter 2.3(d) the median River Murray level were calculated at 0.74 m AHD based on DWLBC Surface Water Archive data at Pump station 1 Murray Bridge (DWLBC 2005). Reedy Creek wetland water requirements are therefore based on the 0.75 m AHD level. The baseline survey provided estimates of the volume within the wetland at different depths. However, the volumes were estimated for the full wetland and not the manageable area only. Therefore, a simple average depth multiplied by surface area would give the best approximation of volume in the west end of the wetland. The average depth of the western end of the wetland was found to be at 0.25 m AHD based on the data collected by the baseline survey. At 0.75 m AHD the depth of the wetland would be 0.5 m. The calculated volume can be seen in Table 15, the anticipated evaporative loss based on the wetland loss calculator can be seen in Table 16. The total annual water requirements were calculated based on the wetland fill volume and the potential evaporation and can be seen in Table 17. Table 15: Volume estimate for managed section of wetland Parameter
Units
Complete Reedy Creek wetland
Managed section of Reedy Creek wetland only
Depth
m AHD
0.75
0.75
Max depth of wetland
m
1.2
0.5
Surface area
m2
1009195
147342
Volume
m3
639996
73666
Volume
ML
640
74
45
Reedy Creek Wetland Management Plan 2006 Table 16: Calculated water loss (evaporation – precipitation)
Area used in calculation (ha)
TOTAL (ML)
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
8
3
3
7
12
11
22
25
91
8
3
3
7
12
11
22
25
115
8
3
3
7
12
11
22
25
173
Net Loss (ML) 1997 Extreme Dry Year Net Loss (ML) ‘Normal’ Managed Dry Year
24
Net Loss (ML) Wet Year
24
22
20
15
Water loss obtained using the Wetland Loss Calculator
Table 17: Water use calculation Lagoon
Surface area (ha)
Fill volume (ML)
Potential Evaporation (ML)
Total Annual Requirement (ML)
2007 ‘Extreme’ Managed Dry Year
14.6
74
91
165*
‘Normal’ Managed Dry Year
14.6
57 (17 ML remaining at end of ‘dry’ period)
115
172**
Wet Year
14.6
0
173
173
Water
* Assuming the wetland dries completely ** Assuming the wetland does not dry out completely in the time allowed
Using the above information an estimated water use calculation for Reedy Creek wetland, including evaporation loss was developed. This water use calculation can be seen in Table 17. The total annual allocation requirements for Reedy Creek wetland annually (managed area only considered) in a wet year amounts to 173 ML (or 173,000 kL), in 2007 the water requirement is 165 ML. The management of the wetland is planed on an ecological basis. Water savings that could be made by introducing the „Normal‟ managed dry year would only result in a 1 ML water savings. Even the current water savings through the „Extreme‟ managed dry year amounts to a mere 8 ML. Drying of this wetland for water savings would therefore be of no significant benefit to the River Murray water balance and may actually impact on the wetland adversely. This approach to future water savings is for this wetland strongly discouraged. The salinity impact of wetland management was to be estimated using the SIWM model. However, the Department of Water, Land and Biodiversity Conservation (DWLBC) has withdrawn the use of the SIWM model. Some inherent difficulties were found in developing and finalising this model for general use leading to a new modelling approach to be undertaken. DWLBC is presently developing a new model for the simulation of, the impact wetland management will have on salt accumulation within wetlands, as well as, the potential impacts to the river. A salinity assessment will be conducted on Reedy Creek wetland once a model is available for use, a brief report outlining the results of this modelling will be included in the plan in the future.
46
Reedy Creek Wetland Management Plan 2006
Chapter 8.
MONITORING
For the development of a wetland management plan, Reedy Creek wetland was included in the River Murray Wetlands Baseline Survey - 2005 (SKM 2006b). The data collected during this survey provided a basis by which objectives for the wetland management could be refined, hydrology guidelines could be developed and review procedures scheduled. However, this data did not cover all the issues related to managing the Reedy Creek wetland. Partly as a consequence, but also as part of adaptive management and best practise wetland management, monitoring of the wetland has been devised to answer some of the unknowns to the changed hydrological regime and water quality, the monitoring schedule can be seen in Table 19. Ongoing monitoring during wetland management plays a role in adaptive management by providing managers with information on how the wetland is responding to management strategies, whether the objectives are being met, whether there are off-target implications (wetland in regional context) or (as per Your Wetland: Monitoring Manual (Tucker 2004)) whether the Golden Rules are being broken. The Golden Rules being: Don‟t salinise your wetland Don‟t kill long lived vegetation Don‟t destroy threatened communities or habitats of threatened species To ensure that monitored data is available for evaluation, review and reporting, a log of all activities, monitoring and site description should be maintained at an accessible and convenient location. The purpose of such a log is to maintain a record of management steps undertaken, their justification and observed impacts/implications. The maintenance of a log is both good management practice, allowing future reference to potential impacts of management, and a requirement of the Wetland Water License. The data will ultimately be stored in the appropriate databases. Refer to Your Wetland: Monitoring Manual (Tucker 2004) for examples of data log sheets and further description of monitoring methods. On-going fish monitoring should occur in the wetland and in the creek, to establish if the use of the carp screens is reducing numbers getting up the creek to spawn. A permanent photopoint has been installed at Reedy Creek wetland (see Table 18). A second photopoint will be installed at the western end of the wetland to show changes in wetland bed vegetation over the drying cycle. These photopoints will be monitored quarterly, and should show the impact of management of the wetland around the structure and surrounding vegetation. Water quality monitoring should include monitoring of Reedy creek particularly following rains in the creek catchment area. This water quality monitoring will assess the salinity trend of the creek discharge and establish if any significant fresh water inflows and therefore flushing effects can be expected from the creek. Table 18: Permanent photopoint Site Name REEPP01
Date Installed 6/08/2006
Property Pluckhans
Eastings 340297
Northings 6131338
Datum WGS 84
No. Directions
Description 3
Near structure
47
Reedy Creek Wetland Management Plan 2006 Table 19: Monitoring plan for Reedy Creek wetland. Parameter
Method
Priority
Groundwater
Level and conductivity (all wetland piezos.)
Medium
Water quality monitoring (cond, turb, temp)
High
Surface level (using gauge boards)
Low
Seine net, dip net (and fyke nets if deep enough)
High
Photopoint monitoring
High
Quadrat/line intercept
Low
Surface Water
Fish*
Vegetation
Frogs Birds
Recording Calls Fixed area search
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Q
Q
Q
1 monitoring day event
Community Group/ Wetland Officer
Q
Q
Q
Q
1 monitoring day event
Community Group/ Wetland Officer
0.5 hour
Community Group
1 monitoring day event
Community Group/ Wetland Officer
2 hours
Community Group/ Wetland Officer
1 monitoring day event
Community Group/ Wetland Officer
0.5 hour
Community Group/ Wetland Officer
0.5 day
To be resolved
1 monitoring day event (not including identification)
Community Group/ Wetland Officer
Q
Q
Q
Q
Q
Dip net survey Macroinvertebrates
Low Q
Q
High
Responsible
Q
High
Time Required
Q
Q = at some time in the quarter
48
Reedy Creek Wetland Management Plan 2006
Chapter 9. 9.1
EVALUATION, REVIEW AND REPORTING
EVALUATION AND REVIEW
The full impact of a changed hydrology and water quality and the effectiveness of the new regime cannot be fully predicted. Therefore, the data obtained through monitoring need to be regularly reviewed to respond to impacts of the management strategy. A review, of the implications of changed management of Reedy Creek wetland therefore needs to be an ongoing process. For the wetland management plan to be an adaptive and complete document, periodic reviews need to be scheduled in following monitoring and evaluation of the impact of management. An annual review of the monitored data and the condition of the wetland should be conducted by the community group with assistance from the LAP and the SA MDB NRM Board. This first review should be scheduled following the drying and wetting cycle of the wetland. A full review of the wetland management plan should be scheduled in 5 years. For the annual review to be effective it needs to include an upgrade of the; Hydrological regime based on new knowledge and understanding, e.g. whether the drying of the wetland has occurred and its implications on wetland water quality and habitat development (see management objectives Chapter 6) Monitoring schedule to reflect changes in the wetland management plan This can occur via a presentation of the monitoring data collected in relation to the original objectives stated in this management plan to the community group. The group and wetland officers can then determine future courses of action (i.e. whether the wetland should be dried again) and any other issues which will need to be addressed.
9.2
REPORTING
The wetland management plan for Reedy Creek wetland is comprehensive and includes an estimation of the water requirements over the period covered in this plan. Should the volume used deviate substantially from the plan, and therefore the water license, the Department of Water Land and Biodiversity Conservation (DWLBC) will need to be notified. The records noted in the activity and monitoring logs will assist in reporting to DWLBC. Further, as part of the requirements of the water license, any substantial change in the wetland management plan, e.g. objectives, monitoring timetable or hydrology regime change, also needs to be reported to DWLBC.
49
Reedy Creek Wetland Management Plan 2006
Chapter 10.
REFERENCES
AWE (2006). Groundwater Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. Baldwin, D. S., K. C. Hall, et al. (2006). Development of a Protocol for Recognising Sulfidic Sediments (Potential Acid Sulfate Soils) in Inland Wetlands. Wodonga Victoria, Murray-Darling Freshwater Research Centre. DRAFT BOM (2005). Climate Averages. Accessed 18 March 2005, www.bom.gov.au/climate/averages/tables/cw_024518.shtml. Chandler, W. J., R. K. Sandercock, et al. (1979). Reedy Creek Conservation Zone Management Plan. Department of Housing, Urban and Regional Affairs,. Cox, J. B. (1973). "Birds of the Mannum Area." The S.A. Ornithologist 26(103). Cox, J. B. (1974). Systematic List of Birds Recorded from Reedy Creek: East of the Mannum-Murray Bridge Road. Unpublished. Cox, J. B. (1975). Sand-Mining on the Reedy Creek Flood-Plain. DEH (2003). 2003 Review of the Status of Threatened Species in South Australia: Proposed Schedules under the South Australian National Parks and Wildlife Act 1972. Adelaide, National Parks and Wildlife Council in partnership with the Department for Environment and Heritage: 61. Discussion Paper DEH (Commonwealth) (2006a). Australian Heritage Database. Accessed 24 January 2006, http://www.deh.gov.au/cgi-bin/ahdb/search.pl?mode=place_detail;place_id=7895. DEH (Commonwealth) (2006b). Australian Heritage Places Inventory. Accessed 24 January 2006, http://www.heritage.gov.au/cgi-bin/ahpi/record.pl?RNE7895. Douglas, J. S. (1974). A Report of the Effects of Sand Mining Operations on the Vegetation Communities of the Bed of Reedy Creek East of a Road and Bridge Below the Mannum Water Fall. Adelaide, Ecological Survey and Impact Section, South Australian Museum. Report DWLBC (2005). Surface Water Archive. Accessed 3 August 2005, http://www.dwlbc.sa.gov.au/subs/surface_water_archive/a1pgs/mapindex.htm. DWLBC (2006a). Data Download. Accessed 26 June 2006, http://www.dwlbc.sa.gov.au/subs/gis_data/data.htm. DWLBC (2006b). Unpublished Data. Department of Water, Land and Biodiversity Conservation. EBS & HydroTas (2006). Bird Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. Frears, A. P. (2001). An Ecological Evaluation of the Proposal for Rehabilitation of Reedy Creek Lagoon, a Wetland of the River Murray, South Australia. Department of Environmental Biology. Adelaide, University of Adelaide: 70.
50
Reedy Creek Wetland Management Plan 2006
Goonan, P. (2006). Personal Communication. Senior Aquatic Biologist: Environment Protection Authority. Heine, A. (1999). Reedy Creek Wetland Management Plan: Questionnaire for Reedy Creek Stakeholders, Wetland Care Australia. Jensen, A., F. Marsh, et al. (1999). Reedy Creek Wetland Complex Management Plan: Draft for Consultation. Wetland Care Australia, Mannum to Wellington Local Action Planning Committee Inc. Jensen, A., P. Paton, et al. (1996). Wetlands Atlas of the South Australian Murray Valley. ADELAIDE, South Australian River Murray Wetlands Management Committee. South Australian Department of Environment and Natural Resources. Lamontagne, S., W. Hicks, et al. (2004). Sulfidic Materials: An Emerging Environmental Issue for the Management of Salinity in the River Murray Floodplain. 9th Murray-Darling Basin Groundwater Workshop 2004. Lothian, J. A. (1975). Minutes Forming Enclosure to Dec No. 3300 1975. Reedy Creek Sand Extraction Guidelines from and Environmental Study. McBriar, E. M. and A. R. Milnes, Eds. (1968). The Palmer-Mannum-Reedy Creek District of South Australia: A Brief Guide to the History and Geology of the District. Publication No. 13. Adelaide, Department of Adult Education, The University of Adelaide. MDFRC (2006). Water Quality Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. Pressey, R. L. (1986). Wetlands of the River Murray. River Murray Commission. River Murray Catchment Water Management Board (2002). Water Allocation Plan for the River Murray Prescribed Watercourse. Berri, South Australia, Government of South Australia. River Murray Catchment Water Management Board and Department of Water Land and Biodiversity Conservation (2003). Guidelines for Development of Wetland Management Plans for the River Murray in South Australia. SA MDB NRMB (2006). Frog Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. SARDI Aquatic Sciences (2006a). Fish Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. SARDI Aquatic Sciences (2006b). Vegetation Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. SKM (2006a). Macroinvertebrate Surveys. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. SKM (2006b). River Murray Wetlands Baseline Survey - 2005. South Australian Murray Darling Basin Natural Resources Management Board.
51
Reedy Creek Wetland Management Plan 2006
SKM (2006c). Site Physical Survey. River Murray Wetlands Baseline Survey – 2005, South Australian Murray Darling Basin Natural Resources Management Board. Smith, B. (2006). Personal Communication. Sub-Program Leader (Invasive Species): Sardi Aquatic Sciences Inland Waters. Thomas, R. I. (1973a). Report on the Proposed Caloote Reserve. South Australian Museum. Thomas, R. I. (1973b). Report on the Proposed Reedy Creek Reserve. South Australian Museum. Thompson, M. B. (1986). River Murray Wetlands, Their Characteristics, Significance and Management. Adelaide, Department of Environment and Planning and Nature Conservation Society of S.A. Tucker, P. (2004). Your Wetland: Monitoring Manual - Data Collection. Renmark SA, River Murray Catchment Water Management Board, Australian Landscape Trust. Tucker, P., M. Harper, et al. (2002). Your Wetland: Hydrology Guidelines. Renmark SA, Australian Landscape Trust. Walker, S. (2002). Frog Census 2001: Community Monitoring of Water Quality and Habitat Condition in South Australia Using Frogs as Indicators. Adelaide, Environment Protection Agency. Walker, S. (2003). Frog Census 2002: Community Monitoring of Water Quality and Habitat Condition in South Australia Using Frogs as Indicators. Adelaide, Environment Protection Agency. Walker, S. J. and P. M. Goonan (2001). Frog Census 2000: Community Monitoring of Water Quality and Habitat Condition in South Australia Using Frogs as Indicators. Adelaide, Environment Protection Agency. Walker, S. J., B. M. Hill, et al. (1999). Frog Census 1998: Community Monitoring of Water Quality and Habitat Condition in South Australia Using Frogs as Indicators. Adelaide, Environment Protection Agency. Walker, S. J., B. M. Hill, et al. (2000). Frog Census 1999: Community Monitoring of Water Quality and Habitat Condition in South Australia Using Frogs as Indicators. Adelaide, Environment Protection Agency. Wen, L. (2002). Mechanisms for Phosphorus Elimination in Constructed Wetlands: A Pilot Study for the Treatment of Agricultural Drainage Water from Dairy Farms at the Lower River Murray, South Australia. Department of Soil and Water. Adelaide, The University of Adelaide: 197.
52
Reedy Creek Wetland Management Plan 2006
Appendix A.
Wetlands Atlas Data
Table 20: Wetland Atlas Data
FID AREA PERIMETER WETLANDS# WETLANDS-ID AS2482 AUS_WETLANDNR THOM_WETLANDNR THOM_CHANGE WETLAND_NAME COMPLEX_NAME CONS_VALUENR MDBC_DISTNR WATER_REGIME INTERNATIONAL NATIONAL BASIN VALLEY HIGH_CONSERVATIO MODERATE_CONSERV LOW_CONSERVATION SHOULD_REASSESS SHOULD_ASSESS
1111 986332.1559 8956.747097 1111 1110 44040 S0052 REEDY CREEK Self-contained hydrological unit 1 3 PERMANENT 0 0 1 1 1 0 0 0 0
Source: Wetlands Atlas of the South Australian Murray Valley (Jensen et al. 1996)
53
Reedy Creek Wetland Management Plan 2006
Appendix B. Baseline Survey Locations
Source: River Murray Wetlands Baseline Survey – 2005 (SKM 2006b)
54
Reedy Creek Wetland Management Plan 2006
Appendix C.
Baseline Survey DTM
Source: River Murray Wetlands Baseline Survey – 2005 (SKM 2006c)
55
Reedy Creek Wetland Management Plan 2006
Appendix D.
Baseline Survey Groundwater
Source: River Murray Wetlands Baseline Survey – 2005 (AWE 2006)
56
Reedy Creek Wetland Management Plan 2006
Appendix E. Baseline Survey Vegetation
5 3
6 1 3 1 5 0 0 .0 0 0 0 0 0
1 1
42
3 2
2 6 1 3 1 2 5 0 .0 0 0 0 0 0
1
6 1 3 1 7 5 0 .0 0 0 0 0 0
6 1 3 2 0 0 0 .0 0 0 0 0 0
3 3 9 2 5 0.0 0 0 0 0 0 3 3 9 5 0 0.0 0 0 0 0 0 3 3 9 7 5 0.0 0 0 0 0 0 3 4 0 0 0 0.0 0 0 0 0 0 3 4 0 2 5 0.0 0 0 0 0 0 3 4 0 5 0 0.0 0 0 0 0 0 3 4 0 7 5 0.0 0 0 0 0 0 3 4 1 0 0 0.0 0 0 0 0 0 3 4 1 2 5 0.0 0 0 0 0 0 3 4 1 5 0 0.0 0 0 0 0 0 3 4 1 7 5 0.0 0 0 0 0 0 3 4 2 0 0 0.0 0 0 0 0 0 3 4 2 2 5 0.0 0 0 0 0 0 3 4 2 5 0 0.0 0 0 0 0 0 3 4 2 7 5 0.0 0 0 0 0 0 3 4 3 0 0 0.0 0 0 0 0 0
4 4
3 6 1 3 1 0 0 0.0 0 0 0 0 0
8
6 1 3 0 7 5 0 .0 0 0 0 0 0
6 1 3 0 5 0 0 .0 0 0 0 0 0
7
6
8
6 8
5 5 6 1 3 0 2 5 0 .0 0 0 0 0 0
5
6 1 3 0 0 0 0.0 0 0 0 0 0
7
3 3 9 2 5 0.0 0 0 0 0 0 3 3 9 5 0 0.0 0 0 0 0 0 3 3 9 7 5 0.0 0 0 0 0 0 3 4 0 0 0 0.0 0 0 0 0 0 3 4 0 2 5 0.0 0 0 0 0 0 3 4 0 5 0 0.0 0 0 0 0 0 3 4 0 7 5 0.0 0 0 0 0 0 3 4 1 0 0 0.0 0 0 0 0 0 3 4 1 2 5 0.0 0 0 0 0 0 3 4 1 5 0 0.0 0 0 0 0 0 3 4 1 7 5 0.0 0 0 0 0 0 3 4 2 0 0 0.0 0 0 0 0 0 3 4 2 2 5 0.0 0 0 0 0 0 3 4 2 5 0 0.0 0 0 0 0 0 3 4 2 7 5 0.0 0 0 0 0 0 3 4 3 0 0 0.0 0 0 0 0 0 R IV E R M U R R A Y W E T L A N D S B A S E L IN E SURVEY
S u rv e y e d Q u a d ra ts D ive rse g ra ze d sho re line
P h ra g m ite s a u stra lis g ra ssla nd #
M u e h le n b e ckia flo ru le n ta shrub la nd #
T yp h a sp . se d g e la nd #
T yp h a sp . se d g e la nd #
S a lix b a b ylo n ica w o o d la nd
S ch o e n o p le ctu s va lid u s se d g e la nd #
S ch o e n o p le ctu s va lid u s se d g e la nd #
L a rg e -s c a le V e g e ta tio n C o m m u n itie s O p en W ater*
R e e d y C re e k - M a n n u m 1 :1 5 ,0 0 0 0
50
100
200
300
6 1 2 9 7 5 0 .0 0 0 0 0 0
7
D iv ers e G r a z e d H er blan d S a lix s p p . w o o dlan d + /- E u c a ly p tu s c a m a ld u le n s is v a r. c a m a ld u le n s is , P h ra g m ite s a u s tra lis , T y p h a s p ., S c h oe n op le c tu s v a lid u s E u c a ly p tu s c a m a ld u le n s is v a r. c a m a ld u le n s is w o o dlan d*
400 M etr es
c ou m m unnoity u ativ n tita ly esye u rv * D e n* oDteesn co otems m n ity t q nu oa tnqtita e lytiv s uerv d e ye d # oDteesn a o re te sa atoreo as m to a o llsto m amll atop m a p # D en
D iv ers e a qu atic h er blan d P e rs ic a ria la p a th ifoliu m , E le oc h a ris a c u ta , V a llis n e ria s p ira lis , T rig loc h in p r oc e ru m *
Q u a d ra t n u m b e rs re fe r to v e g e ta tio n a s s o c ia tio n s in w e tla n d s u m m a ry
Source: River Murray Wetlands Baseline Survey – 2005 (SARDI Aquatic Sciences 2006b)
57
339 750
.0 0 0 0 0 0
34025 0
.0 0 0 0 0 0
3407 50
.0 0 00 0 0
34 1250
.0 0 0 0 0 0
3 4175 0
.0 0 0 0 0 0
342 250
.0 0 0 0 0 0
34 2750
.0 0 0 0 0 0
3432 50
.0 00 0 0 0
6 1317 50
61 3175 0
.0 00 0 0 0
.0 0 0 0 0 0
5
.0 0 0 0 0 0
.0 0 0 0 00
61 3225 0
339 250
6 1322 50
.0 00 0 0 0
Reedy Creek Wetland Management Plan 2006
5
.0 0 0 0 0 0
.0 00 0 0 0
4
5
3 .0 0 0 0 0 0
402750
.0 0 0 0 0 0
403000
.0 0 0 0 0 0
403250
.0 0 0 0 0 0
5
5
3 5
1
4 5 4 3 4 2 3 5 5 3 2 3 5 3 3 1
5
5 3
5
.0 0 0 0 0 0
.0 0 0 0 0 0
5
6228000
.0 00 0 0 0
5 5
6 2 2 8 0 0 0. 0 0 0 0 0 0
5
339 250
.0 0 0 0 00
402250
339 750 .0 0 0 0 0 0
.0 0 0 0 0 0
402500
34025 0 .0 0 0 0 0 0
.0 0 0 0 0 0
402750
3407 50
.0 0 0 0 0 0
403000
.0 0 0 0 0 0
.0 0 00 0 0
34 1250 403250
R IV E R M U R R A Y W E T L A N D S B A S E L IN E SU R VEY
160 M e tre s
342 250
.0 0 0 0 0 0
34 2750
.0 0 0 0 0 0
3432 50
.0 00 0 0 0
SU R VE Y
Re e dy Cre e k - M an n u m
1 :5 ,5 0 0 120
.0 0 0 0 0 0
E uc a lyp t u s ca m al du l en s is
B o g g y F la t
80
3 4175 0
.0 0 0 0 0 0
R I V E R M U RR A Y W E T LA N D S B A S E L I N E
E u c a ly p tu s c a m a ld u le n s is
0 2040
.0 0 0 0 0 0
6 1297 50
4
5
4 5
4 4 3
5 5
.0 0 0 0 0 0
445 5
3
5 5
.0 0 0 0 0 0
3 4
5
6228250
.0 00 0 0 0
5 3
3
6 2 2 8 2 5 0. 0 0 0 0 0 0
61 3025 0
6228500
5
6 1302 50
402500
.0 0 0 0 0 0
.0 0 0 0 0 0
6 2 2 8 5 0 0. 0 0 0 0 0 0
402250
6 1307 50
.0 00 0 0 0
61 3075 0
5
.0 0 0 0 0 0
55 5 5 55 5 5 55 5 5 5 5 5 5 5 5 5 5 55 5 5 5
5
4
61 2975 0
6 1312 50
61 3125 0
5
0
1: 1 6 , 00 0 t s h o w n i n3 r90 ed box 6 5A r e1a30o f i n t e r e s260
520 M et res
Ar e a o f i n te r e s t sh o w n in r e d b o x
Source: River Murray Wetlands Baseline Survey – 2005 (SARDI Aquatic Sciences 2006b)
58
Reedy Creek Wetland Management Plan 2006
Appendix F. Species List for Reedy Creek wetland (a) FLORA OF REEDY CREEK WETLAND Table 21: Plant Associations at Reedy Creek wetland Association number **
Aquatic species
1
2
X
x
x
X
x
Species
Common name
Atriplex prostrata
creeping saltbush
Avena barbata*
bearded oat
Bolboschoenus caldwellii
salt club-rush
Bromus diandrus*
great brome
Bromus rubens*
red brome
Bromus unioloides*
prairie grass
Carrichtera annua*
ward's weed
Chenopodium pumilio
small crumbweed
Cotula coronopifolia
water buttons
Critesion marinum*
barley grass
Cyperus gymnocaulos
spiny flat-sedge
Echium plantagineum*
Salvation Jane
Eleocharis acuta
common spike-rush
X
Eleocharis sphacelata
tall spike-rush
X
Enchylaena tomentosa
ruby saltbush
Eucalyptus camaldulensis var. camaldulensis
river red gum
Eucalyptus largiflorens
river box
Euphorbia terracina*
false caper
Fumaria bastardii*
bastard's fumitory
Halosarcia pergranulata ssp. pergranulata
black-seed samphire
Hydrocotyle verticillata
shield pennywort
Ipomoea indica*
morning glory
Isolepis fluitans
x
3
4
5
6
7
8
x
x
x
x
X
x
floating club-rush
X
x
Juncus usitatus
common rush
X
x
Lactuca saligna*
wild lettuce
Lolium sp.*
rye grass
Ludwigia peploides ssp. montevidensis
water primrose
Lycium ferocissimum*
African boxthorn
Maireana microcarpa
swamp bluebush
Malva parviflora*
small-flowered marshmallow
Mentha australis
native mint
Muehlenbeckia florulenta
lignum
Onopordum acanthium*
scotch thistle
Parahebe decorosa
parahebe
Paspalum distichum
water-couch
X
Persicaria lapathifolium
pale knotweed
X
Phragmites australis
common reed
X
Phyla canescens*
lippia
Potamogeton crispus
curly pondweed
X
Rumex bidens
mud dock
X
x
x
X
X
x
x
x
x x x
x
x
x
59
Reedy Creek Wetland Management Plan 2006 Salix babylonica*
weeping willow
Salix fragilis*
crack willow
x
Schinus areira*
pepper tree
Schoenoplectus validus
river club-rush
Senecio sp.
groundsel
Solanum nigrum*
black nightshade
Sonchus oleraceus*
common sow-thistle
Suaeda australis
austral seablite
Tetragonia tetragonoides
New Zealand spinach
Trifolium sp.*
clover
Triglochin procerum
water ribbons
X
Typha sp.
bulrush
X
Vallisneria spiralis
ribbon weed
X
x x
X
x
x
x
x
x
x
TOTAL
10
x
x
x
x
9
1
3
x
4
2
5
2
The above list includes opportunistic observations not surveyed in quadrats *denotes exotic species ** Association numbers; 1. Diverse grazed shoreline at western edge of wetland 2. Muehlenbeckia florulenta shrubland 3. Typha sp. sedgeland in central part of wetland 4. Schoenoplectus validus sedgeland in central part of wetland 5. Phragmites australis grassland in eastern part of wetland 6. Typha sp. sedgeland in eastern part of wetland 7. Salix babylonica woodland in eastern part of wetland, 8. Schoenoplectus validus sedgeland in eastern part of wetland. Source: River Murray Wetlands Baseline Survey – 2005 (SARDI Aquatic Sciences 2006b)
Table 22: Large and obvious native plants collected by R. I. Thomas (1973b) Scientific name
Common Name
Scientific name
Eucalyptus camaldulensis
river red gum
Alectryon canescens
Eucalyptus porosa
whipstick peppermint (mallee box)
Dodonaea viscosa
sticky hop-bush
Eucalyptus fasciculosa
pink gum
Pittosporum phylliraeoides
native willow (native apricot)
Melaleuca lanceolata
black tea-tree (moonah)
Bursaria incana
native box
Lomandra effusa
scented mat-rush
Melaleuca orania
oleifolius
Common Name ssp. bulloack bush (rosewood)
Acacia oswaldii
Oswalds wattle
Xanthorrhoea quadrangulata
blackboy (mount lofty grass-tree)
Acacia armata
kangaroo thorn
Casuarina stricta
drooping sheoak
Rhagodia parabolica
oldman saltbush (fragrant saltbush)
Cassinia laevis
old man kangaroo bush
Rhagodia spinescens
spiny saltbush
Exocarpos aphyllus
leafless ballart
Maireana brevifolia
small-leafed bluebush
Muehlenbeckia florulenta
lignum
Maireana appressa
pale-fruit bluebush
Eremophila longifolia
native plum tree (weeping emubush)
Salsola kali
rolly polly (buckbush)
Cornea schlechtendalii
Suaeda australis
sea blight (austral seablite)
Goodenia vernicosa
wavy goodenia
Enchylaena tomentosa
ruby saltbush
Phragmites australis
common reed
Halosarcia halocnemoides
grey samphire
Callitris preissii
native pine (southern cypresspine)
Halosarcia indica ssp. leiostachya
brown-headed samphire
Source: Report on the Proposed Reedy Creek Reserve (Thomas 1973b) More recent common names are in brackets
60
Reedy Creek Wetland Management Plan 2006 Table 23: Vegetation communities in sand mining area of Reedy Creek 1974 Scientific name
Common Name
Red gum flat
Scientific name
Common Name
Ehrharta longiflora*
annual veldt grass
Eucalyptus camaldulensis
river red gum
Lycium ferocissimum*
African boxthorn
Enchylaena tomentosa
ruby saltbush
Marrubium vulgare*
horehound
Threlkeldia diffusa
coast bonefruit
Senecio pterophorus*
African daisy
Suaeda australis
austral seablite
Fumaria sp.*
Sarcocornia quiqueflora
beaded samphire
Ricinus communis*
castor oil plant
Halosarcia pergranulata ssp. pergranulata
black-seed samphire
Cirsium vulgare*
spear thistle
Silybum marianum*
variegated thistle
Halosarcia sp. Creek bank
Foeniculum vulgare*
fennel
Muehlenbeckia florulenta
lignum
Arctotheca calendula*
capeweed
Euphorbia terracina*
false caper
Mesembryantheum crystallinum*
common ice-plant
Oxalis pes-caprae*
soursop
Sandy Stream Bed
Echium plantagineum*
Salvation Jane
Phragmites australis
common reed
Conium maculatum*
hemlock
Typha sp.
bulrush
Lythrum hyssopifolia
lesser loosestrife
Juncus kraussii
sea rush
Sonchus oleraceus*
common sow-thistle
Cynodon dactylon
couch
Salsola kali
buckbush
Sporobolus virginicus
sand couch
Solanum nigrum*
black (-berry) nightshade
Distichlis distichophylla
Australian salt grass
Nicotiana glauca*
tree tobacco
Rumex crispus
dock
Aster subulatus*
wild aster
Source: A Report of the effects of sand mining operations on the vegetation communities of the bed of Reedy Creek east of a road and bridge below the Mannum Water Fall (Douglas 1974)
Map 8: Vegetation map from 1975 61
Reedy Creek Wetland Management Plan 2006
(b) BIRDS OF REEDY CREEK WETLAND Table 24: Habitat features identified in Reedy Creek wetland Habitat Feature
Autumn
Spring
ReeBi01
ReeBi02
ReeBi03
ReeBi04
ReeBi05
ReeBi01
ReeBi02
ReeBi03
ReeBi04
ReeBi05
Shoreline
simple
simple
simple
simple
simple
simple
simple
simple
simple
Simple
Fringing Vegetation
patchy low cover
continuous low cover
continuous low cover
patchy low cover
patchy low cover
patchy low cover
continuous low cover
continuous low cover
patchy low cover
patchy low cover
Reeds
absent
extensive
occasional
occasional
occasional
absent
extensive
occasional
occasional
occasional
Sedges
absent
occasional
occasional
occasional
occasional
absent
occasional
occasional
occasional
occasional
Herbs
extensive
absent
occasional
occasional
occasional
extensive
absent
occasional
occasional
occasional
Wet mud
occasional
occasional
occasional
occasional
extensive
occasional
absent
occasional
extensive
occasional
Dry mud
extensive
occasional
occasional
absent
occasional
occasional
absent
occasional
occasional
occasional
Hollowbearing trees
absent
absent
absent
absent
absent
absent
absent
absent
absent
absent
Perching trees
absent
occasional
absent
absent
absent
absent
occasional
absent
absent
absent
Fringing River Red Gums
absent
occasional
absent
absent
absent
absent
occasional
absent
absent
absent
Water’s edge
>100m from vegetation
>100m from vegetation
>100m from vegetation
in or above vegetation
1-10m from vegetation
in or above vegetation
in or above vegetation
in or above vegetation
in or above vegetation
in or above vegetation
Water Depth (m)
dry
dry
dry
0.5
0.1
1-2
0.5-1
>1
<1
<1
rising
rising
rising
rising
rising
Water Level
Source: River Murray Wetlands Baseline Survey – 2005 (EBS & HydroTas 2006).
1
Accipiter cirrocephalus
Collared Sparrowhawk
1
1
Accipiter fasciatus
Brown Goshawk
1
Aquila audax
Wedge-tailed Eagle
1
Circus approximans
Swamp Harrier
1
Circus assimilis
Spotted Harrier Black-shouldered Kite
1
2
2
1 B
1
1
Elanus axillaris (Elanus notatus)
B
1
1
Haliastur (Milvus) sphenurus
Whistling Kite
B
1
2
2
1
Hieraaetus morphnoides
Little Eagle
1
2
2
B
1
Milvus migrans
Black Kite
1
1
Alauda arvensis
Skylark
1
1
Mirafra javanica
Horsfield’s (Singing) BushlarkI
1 1
180
2
2
M
1
Anas castanea
Chestnut Teal
26
206
M
1
Anas gracilis
Grey Teal
JAMBA
CAMBA
PROPOSED CRITERIA (3)
PROPOSED STATUS (3)
COMMON NAME
CURRENT STATUS (3)
Scientific name
1
1 B
Total species recorded
Conservation Status 2005 (2)
Total Abundance 2005 (2)
Spring 2005 (2)
Autumn 2005 (2)
List 1973 (1)
Breeding 1973 (1)
Table 25: Bird species observed at Reedy Creek wetland
62
1 B
1
Anas rhynchotis
Australasian Shoveler
M
1
Anas superciliosa
Pacific Black Duck
8
8
M
1
Aytha australis
Hardhead (Whiteeyed duck)
1
Biziura lobata
Musk Duck
2
M
1
Chenonetta jubata
Australian Wood Duck
17
M
1
Cygnus atratus
Black Swan
1
1
Malacorhynchus membranaceus
Pink-eared Duck
1
1
Stictonetta naevosa
Freckled Duck
1
Tadorna tadornoides
Australian Shelduck
1
Egretta (Ardea) novaehollandiae
White-faced Heron
1
1
Egretta alba
White Egret
1
1
Egretta garzetta
Little Egret
1
1
Artamus cyanopterus
Dusky Woodswallow
1
1
Cracticus torquatus
Grey Butcherbird
1
1
Gymnorhina tibicen
Australian Magpie
1
1
Cacatua galerita
Sulphur-crested Cockatoo
1
1
Cacatua sanguinea
Little Corella Galah
17
4
1
5 5
9
M
5
B
1
1
Eolophus (Cacatua) roseicapillus
B
1
1
Nymphicus hollandicus
Cockatiel
1
1
Coracina novaehollandiae
Black-faced Cuckooshrike
1
1
Lalage tricolor (sueurii)
White-winged Triller
1
Charadrius bicinctus
Double-Banded Plover
1
1
Charadrius leschenaultii
Large Sand-dotterel / Greater Sand Plover
B
1
1
Charadrius ruficapillus
Red-capped Plover
B
1
26
4
30
M
1
Elseyornis (Charadrius) melanops
Black-fronted Dotterel
B
1
30
1
31
M
1
Erythrogonys cinctus
Red-kneed Dotterel
1
1
Pluvialis fulva
Pacific Golden Plover
1
1
Pluvialis squatarola
Grey Plover
1
Vanellus miles
Masked Lapwing
1
1
Vanellus tricolor
Banded Lapwing
1
1
Climacteris picumnus
Brown Treecreeper
1
1
Columba livia
1
1
Geopelia cuneata
1
B
1
1
6
1
32
38
M
M
R
R
RA
a
R
R
RA
bc(i)
V
R
RA
d(ii)
R
RA
c(iv)
R
RA
c(ii)
R
RA
c(ii)
JAMBA
CAMBA
PROPOSED CRITERIA (3)
PROPOSED STATUS (3)
CURRENT STATUS (3)
COMMON NAME
23
2
1
1
B
Scientific name
14
1 1
B
Total species recorded
9
Conservation Status 2005 (2)
1
10
Stat e R; M
10
Total Abundance 2005 (2)
1
Spring 2005 (2)
Autumn 2005 (2)
B
List 1973 (1)
Breeding 1973 (1)
Reedy Creek Wetland Management Plan 2006
1
1
1
1
1
Rock DoveI (Feral Pigeon, Domestic PigeonIntorduced)
Diamond Dove
63
1
1
1
1
Ocyphaps (Geophaps) lophotes
Crested Pigeon
1
1
Corvus mellori
Little Raven
1
1
Cacomantis (Cuculus) flabelliformis
Fan-tailed Cuckoo
1
1
Chalcites (Chrysococcyx) basalis
Horsfield's BronzeCuckoo
1
1
Chalcites (Chrysococcyx) lucidus
Shining BronzeCuckoo
1
1
Chalcites (Chrysococcyx) osculans
Black-eared Cuckoo
1
1
Cuculus pallidus
Pallid Cuckoo
1
1
Dicaeum hirundinaceum
Mistletoebird
1
1
Grallina cyanoleuca
Magpie-lark (Australian, Murray Magpie)
1
1
Myiagra inquieta
Restless Flycatcher
1
1
Rhipidura albiscapa (fuliginosa)
Grey Fantail
1
1
Rhipidura leucophrys
Willie Wagtail
1
1
Falco berigora
Brown Falcon
1
1
Falco cenchroides
Nankeen (Australian) Kestrel
1
1
Falco longipennis
Australian Hobby (Little Falcon)
1
1
Falco peregrinus
Peregrine Falcon
1
1
Falco subniger
Black Falcon
1
1
Carduelis carduelis
European Goldfinch (Introduced)
1
1
Stiltia isabella
Australian Pratincole
1
1
Dacelo novaeguineae
Laughing Kookaburra
1
1
Todiramphus sanctus
Sacred Kingfisher
1
1
Cheramoeca leucosternus
White-backed Swallow
B
1
1
Hirundo neoxena
Welcome Swallow
B
1
1
Petrochelidon (Hirundo) ariel
Fairy Martin
1
1
Petrochelidon (Hirundo) nigricans
Tree Martin
1
1
Chlidonias hybridus
Whiskered (Marsh) Tern
1
Larus novaehollandiae
Silver Gull
1
1
Sterna caspia
Caspian Tern
1
1
Sterna nilotica
Gull-billed Tern
B
B
B
B
B
B
B
1
1
1
Peaceful dove
R
R
No long er liste d
LR
R
RA
b
R
RA
c(i)
JAMBA
CAMBA
PROPOSED CRITERIA (3)
COMMON NAME
PROPOSED STATUS (3)
Scientific name Geopelia placida (formerly striata)
CURRENT STATUS (3)
Total species recorded
Conservation Status 2005 (2)
Total Abundance 2005 (2)
Spring 2005 (2)
Autumn 2005 (2)
List 1973 (1)
Breeding 1973 (1)
Reedy Creek Wetland Management Plan 2006
1
64
1
1
Malurus cyaneus
1
1
Malurus lamberti
Variegated Fairy-wren
1
1
Acanthagenys rufogularis
Spiny-cheeked Honeyeater
1
1
Anthochaera carunculata
Red Wattle-bird
1
Epthianura albifrons
White-fronted Chat
1
1
Epthianura aurifrons
Orange Chat
1
1
Lichenostomus penicillatus
White-plumed Honeyeater
1
1
Lichenostomus virescens
Singing Honeyeater
1
1
Manorina flavigula
Yellow-throated Miner
1
1
Manorina melanocephala
Noisy Miner
1
1
Melithreptus brevirostris
Brown-headed Honeyeater
1
1
Melithreptus lunatus
White-naped Honeyeater
1
1
Plectorhyncha lanceolata
Striped Honeyeater
1
1
Merops ornatus
Rainbow Bee-eater
B
1
1
Anthus novaeseelandiae
Richard’s Pipit
B
1
1
Daphoneositta chrysoptera
Varied Sittella
1
1
Colluricincla harmonica
Grey Shrike-thrush
1
1
Pachycephala rufiventris
Rufous Whistler
1
1
Acanthiza chrysorrhoa
Yellow-rumped Thornbill
1
1
Acanthiza nana
Yellow Thornbill
1
1
Acanthiza uropygialis
Chestnut-rumped Thornbill
B
1
1
Aphelocephala leucopsis
Southern Whiteface
B
1
1
Pardalotus striatus substriatus
Striated pardalote
1
1
Smicrornis brevirostris
Weebill
B
1
1
Passer domesticus (Introduced)
House SparrowI
B
1
4
4
1
Taeniopygia guttata
Zebra Finch
1
8
73
1
Pelicanus conspicillatus
Australian Pelican
1
1
Melanodryas cucullata cucullata
1
1
1
1
B
B
B
B
1
100
100
65
R
R
RA
b
Hooded Robin (South East subspecies)
R
RA
b
Microeca fascinans fascinans
Jacky Winter (Mount Lofty Ranges and South East subspecies)
R
RA
b
Petroica goodenovii
Red-capped Robin
JAMBA
CAMBA
PROPOSED CRITERIA (3)
COMMON NAME Superb Fairy-wren (Blue Wren)
PROPOSED STATUS (3)
Scientific name
CURRENT STATUS (3)
Total species recorded
Conservation Status 2005 (2)
Total Abundance 2005 (2)
Spring 2005 (2)
Autumn 2005 (2)
List 1973 (1)
Breeding 1973 (1)
Reedy Creek Wetland Management Plan 2006
65
B
B
1
Phalacrocorax carbo
1
2
2
1
Phalacrocorax melanoleucos
Little Pied Cormorant
1
1
1
1
Phalacrocorax sulcirostris
Little Black Cormorant
1
1
1
1
Phalacrocorax varius
Pied Cormorant
1
1
Coturnix pectoralis
Stubble Quail
1
1
Podargus strigoides
Tawny Frogmouth
1
7
7
1
Poliocephalus poliocephalus
Hoary-headed Grebe
1
1
1
1
Tachybaptus novaehollandiae
Australasian Grebe
1
1
Pomatostomus superciliosus
White-browned Babbler
1
1
Barnardius zonarius barnardi
Mallee (Australian) Ringneck
1
1
Glossopsitta prophyrocephala
Purple-crowned Lorikeet
1
1
Melopsittacus undulatus
Budgerigar
1
Neophema chrysostoma
Blue-winged Parrot
1
Neophema elegans
Elegant Parrot
1
1
Platycercus elegans (adelaidae)
Adelaide Rosella
1
1
Psephotus haematonotus
Red-rumped (RedBacked) Parrot
1
1
1
B
JAMBA
CAMBA
PROPOSED CRITERIA (3)
PROPOSED STATUS (3)
CURRENT STATUS (3) V
V
VU
C2b
R
RA
c(i)
V
VU
A1b e
V
VU
A1b
1
R
RA
c(ii)
1
1
1
Psephotus varius
Mulga Parrot
1
1
1
Gallinula tenebrosa
Dusky Moorhen
1
23
1
Gallinula ventralis
Black-tailed Nativehen
1
4
4
1
Gallirallus philippensis
Buff-banded Rail
1
3
3
1
Porphyrio porphyrio
Purple Swamphen
1
1
Porzana fluminea
Australian Spotted Crake
1
1
Cladorhynchus leucocephalus
Banded Stilt
1
Himantopus himantopus
Black-winged Stilt
1
Recurvirostra novaehollandiae
Red-necked Avocet
1
Rostratula benghalensis
Painted Snipe
1
Actitis hypoleucos
Common Sandpiper
1
1
Calidris acuminata
Sharp-tailed Sandpiper
1
1
1
1
Calidris canutus
Red Knot
1
1
1
1
Calidris ferruginea
Curlew Sandpiper
1
1
1
Calidris ruficollis
Red-necked Stint
1
1
1 1
B
Total species recorded
Conservation Status 2005 (2)
Total Abundance 2005 (2)
Spring 2005 (2)
10
1 B
COMMON NAME
6
4
1 B
Scientific name
Great Cormorant (Black, Large)
1
B
Autumn 2005 (2)
List 1973 (1)
Breeding 1973 (1)
Reedy Creek Wetland Management Plan 2006
22
1
7
1
1
7
14
M
1
1 1
1
1
10
1
10
M
M
R
66
CAMBA
JAMBA
PROPOSED CRITERIA (3)
PROPOSED STATUS (3)
CURRENT STATUS (3)
Total species recorded
Conservation Status 2005 (2)
Total Abundance 2005 (2)
R
RA
c(ii)
1
1
Black-tailed Godwit
R
RA
c(ii)
1
1
Tringa glareola
Wood Sandpiper
R
RA
c(ii)
1
1
1
Tringa nebularia
Common Greenshank
1
1
1
1
Tringa stagnatilis
Marsh Sandpiper (Little Greenshank)
1
1
1
1
Sturnus vulgaris
1
Acrocephalus australis (A. stentoreus now considered Asian)
Australian (Clamorous) reedwarbler
1
1
Cincloramphus cruralis
Brown Songlark
1
1
Cincloramphus mathewsi
Rufous Songlark
1
Megalurus gramineus
Little Grassbird
1
1
15
14
Scientific name
COMMON NAME
1
1
Gallinago hardwickii
Latham's (Japanese) Snipe
1
1
Limosa limosa
1
1
1
B
Spring 2005 (2)
Autumn 2005 (2)
List 1973 (1)
Breeding 1973 (1)
Reedy Creek Wetland Management Plan 2006
1
1
1
11
1
11
11
11
M
M
M
Common StarlingI (Introduced)
1
9
2
11
1
Platalea flavipes
Yellow-billed Spoonbill
1
14
2
16
1
Platalea regia
Royal Spoonbill
1
Plegadis falcinellus
Glossy Ibis
1
V
R
1
42
42
1
Threskiornis molucca
Australian White Ibis
1
58
58
1
Threskiornis spinicollis
Straw-necked Ibis
1
1
Tyto alba
Barn Owl
1
1
Zosterops lateralis
Silvereye
R
RA
c(i)
Total 42
154
25
29
42
154
Conservation Status: M = Migratory (1) Source: J.B. Cox unpublished data (Cox 1974) (2) Source: Murray Wetlands Baseline Survey – 2005 (EBS & HydroTas 2006). (3) Source: 2003 Review of the Status of Threatened Species in South Australia: Proposed Schedules under the South Australian National Parks and Wildlife Act 1972 (DEH 2003)
Table 26: Habitat use by waterbird species at Reedy Creek wetland
Aythya australis
R
6
Australian Wood Duck
Chenonetta jubata
R
2
Pacific
Anas superciliosa
R
8
Black
2
Total
Hardhead
Samphire
9
Willows
9
Grass
R
Dead logs logs
Tadorna tadornoides
2
Reg gums
7
Australian Shelduck
2
Lignum
7
Shallow water
6
R
Mud
F
Cygnus atratus
Sedges
Cygnus atratus
Black Swan
Reed beds
Black Swan
Open water
Scientific Name Activity
Common Name
10
8 2
6
4
18
67
Reedy Creek Wetland Management Plan 2006 Duck Anas superciliosa
F
3
Australasian Shoveler
Anas rhynchotis
F
10
Grey Teal
Anas gracilis
R
22
Grey Teal
Anas gracilis
F
170
Chestnut Teal
Anas castanea
R
Australasian Grebe
Tachybaptus novaehollandiae
F
1
1
Hoary-headed Grebe
Poliocephalus poliocephalus
F
7
7
Little Pied Cormorant
Phalacrocorax melanoleucos
F
2
2
Pied Cormorant
Phalacrocorax varius
F
1
1
Little Black Cormorant
Phalacrocorax sulcirostris
F
1
1
Great Cormorant
Phalacrocorax carbo
R
Great Cormorant
Phalacrocorax carbo
F
Australian Pelican
Pelecanus conspicillatus
R
65
White-faced Heron
Egretta novaehollandiae
F
1
Australian White Ibis
Threskiornis molucca
Straw-necked Ibis
Pacific Duck
Black
2
5 10
4
10
36 170
2
2
4
4
6
6 8 2
73 1
1
5
F
42
42
Threskiornis spinicollis
F
58
58
Royal Spoonbill
Platalea regia
F
Yellow-billed Spoonbill
Platalea flavipes
R
Yellow-billed Spoonbill
Platalea flavipes
F
Swamp Harrier
Circus approximans
F
Buff-banded Rail
Gallirallus philippensis
F
Purple Swamphen
Porphyrio porphyrio
R
Purple Swamphen
Porphyrio porphyrio
F
Black-tailed Nativehen
Gallinula ventralis
F
Dusky Moorhen
Gallinula tenebrosa
F
Common Greenshank
Tringa nebularia
F
Common Sandpiper
Actitis hypoleucos
F
1
1
Red-necked Stint
Calidris ruficollis
F
10
10
Black-winged Stilt
Himantopus himantopus
F
7
Red-necked Avocet
Recurvirostra novaehollandiae
F
1
Doublebanded Plover
Charadrius bicinctus
F
1
1
Black-fronted Dotterel
Elseyornis melanops
F
23
23
Black-fronted Dotterel
Elseyornis melanops
R
7
7
16
16 1
1 1
1
9
10
1
2
4
4 1
1
2
2 20
2
1
23
1
1
1
1
7
14 1
68
Reedy Creek Wetland Management Plan 2006 Red-kneed Dotterel
Erythrogonys cinctus
F
30
Masked Lapwing
Vanellus miles
R
4
Silver Gull
Larus novaehollandiae
R
Clamorous Reed-warbler
Acrocephalus australis
F
Clamorous Reed-warbler
Acrocephalus australis
R
8
Little Grassbird
Megalurus gramineus
F
3
Total
1
31 2
32
1
1 3
262
38
14
3 8
8 72
108
40
24
11 1
22
4
0
140
687
Activity: F = Feeding, R = Roosting/resting Source: River Murray Wetlands Baseline Survey – 2005 (EBS & HydroTas 2006).
(c) FISH Table 27: Fish survey sites Site #
Habitat description
Method
1
Grazed emergent veg, gently sloping bank, firm substrate, some snags, 20 cm deep
Seine
2
Bare gently sloping bank, firm substrate, grazed, open water
Seine
3
Dense emergent reeds, firm substrate, 60 cm deep
Bait Trap
4
Rocky habitat below cliff, extending to muddy bottom, soft substrate, adjacent emergent reeds, 1 m deep
GilNet
5
Dense emergent reeds, adjacent boat landing, soft substrate, 50 cm deep
Fyke Net
6
Open water, centre of wetland, firm substrate, 50 cm depth
Seine
7
Upland gully, large granite boulders, permanent pool, soft substrate, high salinity, 1 – 2 m deep
Gil Net
8
Upland gully, large granite boulders, permanent pool, soft substrate, high salinity, 1 – 2 m deep
Bait Trap
9
Upland permanent pool, dense emergent reeds on opposite bank, 2 m deep
Fyke Net
Source: River Murray Wetlands Baseline Survey – 2005 (SARDI Aquatic Sciences 2006a)
69
Reedy Creek Wetland Management Plan 2006 Table 28: Fish captured at Reedy Creek Autumn
Spring
Total
Length (TL, mm)
Length (TL, mm)
Common Name
Species Name
Native Fishes small-mouthed hardyhead
Atherinosoma microstoma
bony herring
Nematalosa erebi
145
137
50
305
85
164
47
430
230
flathead gudgeon carp gudgeon complex
Philypnodon grandiceps
160
54
26
114
34
58
34
80
194
85
41
32
56
22
40
32
58
107
common galaxias
Galaxias maculatus
7
63
54
75
1
lagoon goby
Count
Ave
Min
Max
Count
Ave
Min
Max
2
Hypseleotris spp.
golden perch
Tasmanogobius lastii Macquaria ambigua ambigua
Australian smelt
Retropina semoni
2
7 1
57
57
57
2
249
185
312
5
220
178
296
7
36
56
37
70
105
61
51
77
141
9
36
27
53
116
36
26
69
125
9
38
32
43
7
44
38
50
16
Threatened Native Fishes unspecked hardyhead dwarf-flathead gudgeon
C. s. fulvus
Murray rainbowfish
Melanotaenia fluviatilis
9
36
29
42
common carp
Cyprinus carpio
55
113
83
338
49
391
23
750
104
goldfish
Carassius auratus
10
104
78
120
8
137
104
191
18
eastern gambusia
Gambusia holbrooki
326
35
20
56
Philypnodon sp.
9
Exotic/Invasive Fish
326
853
Number of fish
1287
434
Number of native fish
839
Number of exotic fish
448 14
12 11 Count of species Native to Invasive ratio (Species) 3.7 Native to Invasive ratio (number of fish) 1.8 Source: River Murray Wetlands Baseline Survey - 2005 (SARDI Aquatic Sciences 2006a)
(d) MACROINVERTEBRATES Higher taxa
Family
Subfamily/Genus
Site 1
Autumn Site 2 Site 5
Site 1
Bryozoa Cnidaria
Turbellaria
Hydridae
Hydra
Clavidae
Cordylophora
Dugesiidae
Austropeplea
Acariformes: Oribatida Acariformes: Astigmata
Histiostomatidae
3
4
Peza
13
3
2
3 Pezidae
3
2
51
27 2
Physa
Oligochaeta Acariformes: Prostigmata
3
4
Planorbidae Physidae
Total abundance
3
2 7
Lymnaeidae
Site 5
4
Nematoda Gastropoda
Spring Site 2
1
7
3
9
1
20
3
24
3
30
5
93
7
7 10
10
3
3
70
Reedy Creek Wetland Management Plan 2006 Acariformes: Hydracarina
Hydromidae
Hydrodroma
Amphipoda
Hyalidae
Austrochiltonia
Eusiridae
Pseudomera
4
1
immature
3
41
Caridina
29
immature
5
Paratya
5
Decapoda
Collembola
Coleoptera
Diptera
Atyidae
26
Katianna
Dytiscidae
larvae
Hydraenidae
Octhebius
Culicidae
Anophelinae
Ceratopogonidae
Ceratopogoninae
Psychodidae
Hemiptera
10
8
26
13
3
32
12
263
275
20
1
1
1
1 1
Tanypodinae
5
Orthocladinae
4 1
32
immature
1
Caenidae
Tasmanocoenis
1
Mesoveliidae
Mesovelia
11
Corixidae
immature 510
1 2
112
1
3
28
39
31
17
368
419
6
110
13
274
3
4 1 11
9
10
7
30
47
76
120
23
738
10
10
3
11
8
12
15
15
Anisops 8
Coenagrionidae
3
Lestidae
Austrolestes
Hydroptilidae
Hellyethira
Leptoceridae
immature
21 1
1
3
1
2
17
22 3
7
Triplectides
Total number of taxa
49
13
Triaenodes
Total abundance
98
13
immature
Trichoptera
48
1
Micronecta
Odonata
10
1
1
Baetidae
Notonectidae
5
1
Chironominae Ephemeroptera
3 48
13
Ephydridae Chironomidae
7
3 15
20
Hypogastruridae Sminthuridae
7
3 7
23
23
515
182
140
226
710
625
2398
4
19
8
18
21
24
43
Source: River Murray Wetlands Baseline Survey - 2005 (SKM 2006a)
71