Activity Guide
D60079GC10 Edition 1.0 August 2011 D73723
For Instructor Use Only. This document should not be distributed.
R12.x Oracle Advanced Supply Chain Planning Fundamentals
Copyright © 2011, Oracle. All rights reserved. This document contains proprietary information and is protected by copyright and other intellectual property laws. You may copy and print this document solely for your own use in an Oracle training course. The document may not be modified or altered in any way. Except where your use constitutes "fair use" under copyright law, you may not use, share, download, upload, copy, print, display, perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part without the express authorization of Oracle. The information contained in this document is subject to change without notice. If you find any problems in the document, please report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not warranted to be error-free.
U.S. GOVERNMENT RIGHTS The U.S. Government’s rights to use, modify, reproduce, release, perform, display, or disclose these training materials are restricted by the terms of the applicable Oracle license agreement and/or the applicable U.S. Government contract. Oracle, JD Edwards, PeopleSoft, and Siebel are registered trademarks of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective owners.
Author Jason Lansdowne Technical Contributors and Reviewers Rod Sernett, Moshin Lee, Roger Goossens, David Nelson, Lez Stodart This book was published using:
oracletutor
For Instructor Use Only. This document should not be distributed.
If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the United States Government, the following notice is applicable:
R12.x Oracle Advanced Supply Chain Planning Fundamentals ..................................................................1-1 R12.x Oracle Advanced Supply Chain Planning Supplemental Practices......................................................1-3 Lesson 1 - Advanced Supply Chain Planning Overview ................................................................................1-4 Lesson 2- Planning Information and Planner Workbench ..............................................................................1-5 Practice - Copying Plans ............................................................................................................................1-6 Solution – Copying Plans ...........................................................................................................................1-7 Practice - Researching Data for Planning ..................................................................................................1-13 Solution – Researching Data for Planning..................................................................................................1-14 Practice - Researching Planning Results ...................................................................................................1-31 Solution – Researching Planning Results ..................................................................................................1-32 Lesson 3 - Unconstrained Plans ....................................................................................................................1-51 Viewing Unconstrained Plan Options .........................................................................................................1-52 Solutions: Viewing Unconstrained Plan Options ........................................................................................1-53 Lesson 4 - Demand and Supply .....................................................................................................................1-57 Practice - Reviewing Demand and Supply .................................................................................................1-58 Solution – Reviewing Demand and Supply ................................................................................................1-59 Lesson 5 - Modeling the Supply Chain...........................................................................................................1-65 Practice: Defining an Item Attribute Simulation Set....................................................................................1-66 Solutions: Defining an Item Attribute Simulation Set ..................................................................................1-68 Guided Demonstration - Sourcing ..............................................................................................................1-78 Practice - Modeling the Supply Chain ........................................................................................................1-80 Solution – Modeling the Supply Chain .......................................................................................................1-81 Lesson 6 - Collections....................................................................................................................................1-100 Practice - Viewing Collections ....................................................................................................................1-101 Solution – Viewing Collections ...................................................................................................................1-102 Lesson 7 - Analyzing Unconstrained Plans ....................................................................................................1-105 Practice - Analyzing Supply and Demand ..................................................................................................1-106 Solution – Analyzing Supply and Demand .................................................................................................1-107 Practice - Releasing Recommendations ....................................................................................................1-114 Solution – Releasing Recommendations....................................................................................................1-115 Lesson 8 - Constrained Plans ........................................................................................................................1-117 Practice - Setting Up Constrained Plans ....................................................................................................1-118 Solution – Reviewing Constrained Plans ...................................................................................................1-119 Lesson 9 - Querying Supply Chain Plan Information......................................................................................1-133 Practice - Filtering Exception Messages Using Queries.............................................................................1-134 Solution - Filtering Exception Messages Using Queries.............................................................................1-135 Practice - Order Query Setup and Process ................................................................................................1-137 Solution - Order Query Setup and Process ................................................................................................1-138 Lesson 10 - Constrained Enforce Capacity Constraints Plans .......................................................................1-142 Practice - Working with Enforce Capacity Constraints Plans I ...................................................................1-143 Solution – Working with Enforce Capacity Constraints Plans.....................................................................1-144 Practice - Working with Enforce Capacity Constraints Plans II ..................................................................1-150 Solution – Working with Enforce Capacity Constraints Plans II..................................................................1-151 Lesson 11 - Constrained Enforce Capacity Constraints with Decision Rules Plan.........................................1-152 Practice - Working with Decision Rule Plans..............................................................................................1-153 Solution – Working with Decision Rule Plans.............................................................................................1-154 Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents i
For Instructor Use Only. This document should not be distributed.
Table of Contents
For Instructor Use Only. This document should not be distributed.
Lesson 12 - Constrained Enforce Demand Due Dates Plans ........................................................................1-160 Practice - Working with Enforce Demand Due Date Plans.........................................................................1-161 Solution – Working with Enforce Demand Due Date Plans ........................................................................1-162 Lesson 13 - Cost-Based Optimized Plans......................................................................................................1-165 Practice - Working with Optimized Plans....................................................................................................1-166 Solution – Working with Optimized Plans...................................................................................................1-167 Lesson 14 - Global Forecasting .....................................................................................................................1-168 Lesson 15 - Integrating Advanced Supply Chain Planning with Other Oracle Applications ...........................1-169 Lesson 16 – Planning Strategies....................................................................................................................1-170 Practice - Performing Simulationss ............................................................................................................1-171
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents ii
Preface Profile
Prerequisites • Oracle Inventory • Oracle Engineering Bills of Material.
How This Course Is Organized R12.x Oracle Advanced Supply Chain Planning Fundamentals is an instructor-led course featuring lecture and hands-on exercises. Online demonstrations and written practice sessions reinforce the concepts and skills introduced.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents iii
For Instructor Use Only. This document should not be distributed.
Before You Begin This Course • Basic knowledge of planning • Basic knowledge of Oracle applications navigation
Related Publications Oracle Publications Oracle Advanced Planning Implementation and User’s Guide, Release 12
Additional Publications • System release bulletins • Installation and user’s guides • Read-me files • International Oracle User’s Group (IOUG) articles • Oracle Magazine
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents iv
Part Number B31553-01
For Instructor Use Only. This document should not be distributed.
Title
Typographic Conventions Typographic Conventions in Text
Caps and lowercase Courier new, case sensitive (default is lowercase)
Initial cap
Element Glossary term (if there is a glossary) Buttons, check boxes, triggers, windows Code output, directory names, filenames, passwords, pathnames, URLs, user input, usernames
Arrow Brackets Commas
Graphics labels (unless the term is a proper noun) Emphasized words and phrases, titles of books and courses, variables Interface elements with long names that have only initial caps; lesson and chapter titles in crossreferences SQL column names, commands, functions, schemas, table names Menu paths Key names Key sequences
Plus signs
Key combinations
Italic
Quotation marks
Uppercase
Example The algorithm inserts the new key. Click the Executable button. Select the Can’t Delete Card check box. Assign a When-Validate-Item trigger to the ORD block. Open the Master Schedule window. Code output: debug.set (‘I”, 300); Directory: bin (DOS), $FMHOME (UNIX) Filename: Locate the init.ora file. Password: User tiger as your password. Pathname: Open c:\my_docs\projects URL: Go to http://www.oracle.com User input: Enter 300 Username: Log on as scott Customer address (but Oracle Payables) Do not save changes to the database. For further information, see Oracle7 Server SQL Language Reference Manual. Enter
[email protected], where user_id is the name of the user. Select “Include a reusable module component” and click Finish. This subject is covered in Unit II, Lesson 3, “Working with Objects.”
Use the SELECT command to view information stored in the LAST_NAME column of the EMP table. Select File > Save. Press [Enter]. Press and release keys one at a time: [Alternate], [F], [D] Press and hold these keys simultaneously: [Ctrl]+[Alt]+[Del]
Typographic Conventions in Code Convention
Element
Example Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents v
For Instructor Use Only. This document should not be distributed.
Convention Bold italic
Oracle Forms triggers Column names, table names
When-Validate-Item
Passwords
DROP USER scott IDENTIFIED BY tiger; OG_ACTIVATE_LAYER (OG_GET_LAYER (‘prod_pie_layer’))
SELECT last_name FROM s_emp;
PL/SQL objects
Lowercase italic Uppercase
Syntax variables
CREATE ROLE role
SQL commands and SELECT userid FROM emp; functions
Typographic Conventions in Oracle Application Navigation Paths This course uses simplified navigation paths, such as the following example, to direct you through Oracle Applications. (N) Invoice > Entry > Invoice Batches Summary (M) Query > Find (B) Approve This simplified path translates to the following: 1.
(N) From the Navigator window, select Invoice then Entry then Invoice Batches Summary.
2.
(M) From the menu, select Query then Find.
3.
(B) Click the Approve button.
Notations: (N) = Navigator (M) = Menu (T) = Tab (B) = Button (I) = Icon (H) = Hyperlink (ST) = Sub Tab
Typographical Conventions in Oracle Application Help System Paths This course uses a “navigation path” convention to represent actions you perform to find pertinent information in the Oracle Applications Help System. The following help navigation path, for example— (Help) General Ledger > Journals > Enter Journals —represents the following sequence of actions: 1.
In the navigation frame of the help system window, expand the General Ledger entry.
2.
Under the General Ledger entry, expand Journals. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents vi
For Instructor Use Only. This document should not be distributed.
Caps and lowercase Lowercase
Under Journals, select Enter Journals.
4.
Review the Enter Journals topic that appears in the document frame of the help system window.
For Instructor Use Only. This document should not be distributed.
3.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents vii
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Table of Contents viii
Chapter 1
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 1
For Instructor Use Only. This document should not be distributed.
R12.x Oracle Advanced Supply Chain Planning Fundamentals
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 2
For Instructor Use Only. This document should not be distributed.
R12.x Oracle Advanced Supply Chain Planning Supplemental Practices
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 3
There are no Practices and Demonstrations in this Lesson
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 4
For Instructor Use Only. This document should not be distributed.
Lesson 1 - Advanced Supply Chain Planning Overview
For Instructor Use Only. This document should not be distributed.
Lesson 2- Planning Information and Planner Workbench
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 5
Practice - Copying Plans Overview
• • •
Assign station names or numbers to each classroom computer station. Substitute that station identifier wherever you see “XX” in these instructions. Demonstrate how to log on to the Oracle e-Business Suite. Provide the User Name and Password.
Tasks 2. Sign in to the Oracle E-Business Suite Portal. User Name: _____________ Password: ______________ 3. Navigate to the Supply Chain Plan Names form. Responsibility: Advanced Supply Chain Planner Organization: TST: M1 4. Navigate to the Copy Plan form. 5. Copy plan name: Unconstrnd to create plan name XX_Unconst. 6. Save and check your work.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 6
For Instructor Use Only. This document should not be distributed.
1. In this practice you make your own copy of an existing unconstrained plan. Your Instructor will:
Solution – Copying Plans
Notes:
The E-Business Suite portal appears:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 7
For Instructor Use Only. This document should not be distributed.
1. Sign in to the Oracle E-Business Suite Portal. User Name: _____________ Password: ______________
2. In the Applications Navigator, from the Advanced Supply Chain Planner responsibility, navigate to the Supply Chain Plan Names form. • Click on the Advanced Supply Chain Planner link from the list of responsibilities in the Navigator. The center portion of the page will display the menu that is accessible to the Advanced Supply Chain Planner responsibility. (N) Supply Chain Plan > Names • The Organizations window appears in front of the Navigator – Advanced Supply Chain Planner window.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 8
For Instructor Use Only. This document should not be distributed.
Notes:
3. Select TST: M1 Seattle Manufacturing. Click OK. The Supply Chain Names (TST:M1) window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 9
For Instructor Use Only. This document should not be distributed.
Notes:
4. Highlight plan Name Unconstrnd. 5. Navigate to the Copy Plan form. Click (B) Copy Plan The Copy Plan form appears:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 10
For Instructor Use Only. This document should not be distributed.
Notes:
6. In the Destination region , enter the following information for your copy of the plan: − Name: XX_Unconst − Descripition: XX_Unconstrained Plan − Plan Type: Manufacturing Plan 7. Click OK. The Note window appears.
Note the request number: _________________ Click OK. 8. Verify completion of the ‘Copy Plan’ program: (M) View > Requests The Find Requests window opens. (B) Find Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 11
For Instructor Use Only. This document should not be distributed.
Notes:
Notes:
Close the Supply Chain Plan Names window.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 12
For Instructor Use Only. This document should not be distributed.
Locate your request id and verify the status. If your request is pending or running, click the Refresh Data button. Your request should complete with Normal status. If you receive an error, please notify your instructor. (M) File > Close Form. 9. To check your work: Reopen the Supply Chain Plan Names window. (N) Supply Chain Plan > Names Scroll down the list to find your copy of the Unconstrnd plan.
Practice - Researching Data for Planning Overview This practice covers finding and recording information about material and labor. 1. From the Advanced Supply Chain Planner responsibility, navigate to the Planner Workbench in the Instance: Organization TST:M1. 2. Select your plan xx_Unconst. 3. Find Item AS66311 in the Planner Workbench navigator while viewing by Organizations. 4. What organizations have AS66311 enabled? ________________________ 5. View information about item AS66311. 6. What other information shows on the Items window? _________________________ _____________________________________________________________________
7. Look at the hidden fields in the Items window. Add the Description column. 8. View the supply chain for AS66331 9. Diagram the supply chain. 10. What are the components that make up AS66331 at M1 and what are their quantities per? 11. Where does M1 get SB66328? 12. What are the components that make up SB66328 at M2 and S1 and what are their quantities per? 13. Where do all organizations M1, M2, and S1 get the CM components? 14. Where does D2 get AS66311? 15. View components information for some assemblies in the supply chain. 16. View operation information for some assemblies in the supply chain. 17. View resource information for some assemblies in the supply chain. 18. View the where used information for CM66331 in M2, then for other items in the supply chain bill 19. View the capacity load ratio of a resource. 20. View the available capacity for a supplier/supplier site.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 13
For Instructor Use Only. This document should not be distributed.
Tasks
Solution – Researching Data for Planning
For Instructor Use Only. This document should not be distributed.
1. From the Advanced Supply Chain Planner responsibility, navigate to the Planner Workbench in the Instance:Organization TST:M1. (N) Supply Chain Plan > Workbench. If you are prompted to select an Instance/Org, select TST:M1. The Navigator window opens to either the Queries tab or the Plans tab, depending on which has been configured as the default in the Preferences form.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 14
For Instructor Use Only. This document should not be distributed.
2. Select the Plans tab. The Plans tab opens to the View By Organizations.
Notes:
Change the View to View by Items. Click the “+” icon to expand the Plans directory.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 15
Notes:
4. Click the “+” icon to expand your plan. The Plan item categories and descriptions appear.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 16
For Instructor Use Only. This document should not be distributed.
3. Highlight your plan: XX_Unconst.
5. Follow these instructions to find Item AS66311: Expand directory XX_Unconst Expand item category COMPUTER.VPADELITE Expand item AS66311 Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 17
For Instructor Use Only. This document should not be distributed.
Notes:
8. What other information appears on the Items window? BOM Item Type Pegging, Lead times Order modifiers Notes:
9. Add the Description column to the Items window display. Right-click in the scrollable region of the Items window Select Folder > Show Field The Show Field window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 18
For Instructor Use Only. This document should not be distributed.
6. Search the other organizations for AS66311. Which organizations have item AS66311 enabled? − TST:M1 − TST: D2 7. View information about item AS66311 in TST:M1. Click the TST:M1 node under item AS66311. Click the Items icon The Items (TST:M1) Window Appears.
Notes:
10. View the supply chain for AS66311: Click (B) Supply Chain. The Supply Chain Bill (TST:M1) window appears. 11. Diagram the supply chain. You will discuss in class. Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 19
For Instructor Use Only. This document should not be distributed.
Select Description. Click OK.
Notes:
13. Where does M1 get SB66328? Transfer from TST:M2 and TST:S1
Notes:
14. What are the components that make up SB66328 at M2 and S1 and what are their quantities per? Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 20
For Instructor Use Only. This document should not be distributed.
12. What are the components that make up AS66311 at M1 and what are their quantities per? CM66321, 1 per; CM66326, 1 per; and SB66328, 1 per
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 21
For Instructor Use Only. This document should not be distributed.
CM66331, 1 per; CM66332, 1 per; and CM66333, 3 per Return to Navigator > Plans Tab Change the View By to Organization. Expand the navigator tree to focus on item SB66328: Plans> XX_Unconstr > TST:M1 > COMPUTER.VPADELITE > AS66311>SB66328. Select SB66328. Click the Items icon. Click (B) Supply Chain. Expand the Supply Chain Bill: SB66328 > 100% Transfer From TST:M2 > 100% Make At TST:M2. Review the Supply Chain Bill of Materials for item SB66328 in TST:M2; then optionally use the same steps to review the bill in S1.
16. Where does D2 get AS66311? − 100% Transfer from TST:M1 Return to Navigator > Plans Tab > XX_Unconstr > TST:D2 > COMPUTER.VPADELITE > AS66311 Select the Items icon. Click (B) Supply Chain Expand AS66311.
Notes:
17. View components information for some assemblies in the supply chain. Select AS66311 in org TST:M1. Use Planner Workbench context window Components. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 22
For Instructor Use Only. This document should not be distributed.
15. Where do all organizations M1, M2, and S1 get the CM components? − They buy them from suppliers
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 23
Click OK The Components (TST:M1) window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 24
For Instructor Use Only. This document should not be distributed.
Notes:
Notes:
19. View resource information for some assemblies in the supply chain. Use Planner Workbench context window Resources. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 25
For Instructor Use Only. This document should not be distributed.
18. View operation information for some assemblies in the supply chain. Use Planner Workbench context window Routing Operations.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 26
For Instructor Use Only. This document should not be distributed.
20. View the where used information for CM66331 in M2, then for other items in the supply chain bill. Return to the Planner Workbench navigator, Plans tab. Expand the nodes under your plan to find item CM66331 in org. M2 (XX_Unconst>TST:M2>COMPONENT.ELECTRICAL>CM66331) Click on item CM66331 (I) More Select Where Used from the list of values (B) OK The Where Used window is displayed:
21. View the capacity load ratio of a resource. In the Planner Workbench Navigator, View By = Resources Expand directories under Plans, plan XX_Unconst. Expand TST:M1. Select, and then right-click a resource, such as MACHINE > MOLDING > INJECTMOLD Select Horizontal Plan > Default from the right-click menu.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 27
For Instructor Use Only. This document should not be distributed.
To help you locate some other items in the Supply Chain Bill, here is a list of the appropriate categories that each item belongs to: Item CM66332 => Item Category COMPONENT.ELECTRICAL Item CM66333 => Item Category COMPONENT.ELECTRICAL Item SB66328 => Item Category ASSEMBLY.SUBASSY
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 28
For Instructor Use Only. This document should not be distributed.
Note row Capacity Load Ratio
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 29
For Instructor Use Only. This document should not be distributed.
22. View the available capacity for a supplier/supplier site. In the Planner Workbench Navigator, View By = Suppliers Expand directories under Plans, plan XX_Unconstr. Expand a supplier/supplier site node, such as Allied Manufacturing (SAN JOSE-ERS) by clicking the ‘+’ sign to the left. Expand the category COMPONENT.ELECTRICAL, then select Item CM66321. Right click on the item and select Horizontal Plan > Default. Note the Available Capacity row.
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 30
Practice - Researching Planning Results Overview This practice covers researching plan results. 1. From the Advanced Supply Chain Planner responsibility, navigate to the Planner Workbench in the Instance:Organization TST:M1. − (N) Supply Chain Plan > Workbench 2. Select plan XX_Unconstr. 3. Find Item AS66311 in the Planner Workbench navigator. 4. View the horizontal plan and projected available balance graph for some items in the supply chain bill. 5. View Planner Workbench preferences. 6. View supply and demand information for some items in the supply chain. For pegging, follow the pegging tree for supplies and demands in different organizations and verify that the planning process followed the supply chain bill. 7. Look at detailed information about some items in the plan. 8. Find the Supply/Demand fields that relate to date. Look first at fields that display in the Supply/Demand window. Then look at those that do not display; differentiate between those that seem to relate to demands and those that relate to supplies. 9. Make a folder for your use in which you sort records by Sugg Due Date. 10. View only the supply information and only the demand information for some items in the supply chain. 11. View resource information in the supply chain. 12. View requirements against some resources. 13. View availability of some resources. 14. View safety stock information for item AS66311 in organization D2. 15. View key indicators for the plan and some organizations, item categories, and items in the supply chain.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 31
For Instructor Use Only. This document should not be distributed.
Tasks
1. From the Advanced Supply Chain Planner responsibility, navigate to the Planner Workbench in the Instance: Organization TST:M1. (N) Supply Chain Plan > Workbench 2. Select your plan. View by = Organizations Expand the Plans directory Select your plan XX_Unconst. 3. Find Item AS66311 in the Planner Workbench navigator. TST:M1 > COMPUTER.VPADELITE > AS66311 4. View the horizontal plan projected available balance for some items in the supply chain bill. In the Planner Workbench navigator, highlight AS66311, and then click the Horizontal Plan icon, or right click AS66311, and then select Horizontal Plan > Detail from the rightclick menu. − The Projected Available Balance in the first period is 727. Note: The quantities and the dates in the classroom environment may not match those in the screenshot below.
Notes:
Additional information: − Item AS66311 item category is COMPUTER.VPADELITE − Item CM66321 item category is COMPONENT.ELECTRICAL − Item CM66326 item category is COMPONENT.MECHANICAL − Item CM66331 item category is COMPONENT.ELECTRICAL Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 32
For Instructor Use Only. This document should not be distributed.
Solution – Researching Planning Results
− Item CM66332 item category is COMPONENT.ELECTRICAL − Item CM66333 item category is COMPONENT.ELECTRICAL − Item SB66328 item category is ASSEMBLY.SUBASSY
For Instructor Use Only. This document should not be distributed.
5. View Planner Workbench preferences. (M) Tools > Preferences
Notes:
On the Material Plan tab, change Show Graph to Yes. Change the Supplies dropdown to Demands Select the Sales Orders check box. Click Save. Close Preferences. Return to the horizontal plan. Horizontal Plan > Detail Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 33
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 34
For Instructor Use Only. This document should not be distributed.
6. Review the preference settings available on the remaining preferences tabs. Capacity Plan
For Instructor Use Only. This document should not be distributed.
Notes:
Supplier Plan
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 35
For Instructor Use Only. This document should not be distributed.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 36
For Instructor Use Only. This document should not be distributed.
Transportation Plan
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 37
For Instructor Use Only. This document should not be distributed.
Allocated ATP
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 38
For Instructor Use Only. This document should not be distributed.
Gantt
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 39
Notes:
7. View supply and demand information for item AS66311. From the Planner Workbench navigator, select View By Items Expand the tree: Plans > XX_Unconst > COMPUTER.VPADELITE > AS66311 Select item AS66311, then right-click and select Supply and Demand > Supply and Demand The Supply/Demand (TST:M1) window opens.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 40
For Instructor Use Only. This document should not be distributed.
Other
The quantity available is 727, as shown in the horizontal plan.
9. Click on a row in the Supply/Demand form for an item with a planned order and then select the Pegging Supply icon, which is the second icon from the left.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 41
For Instructor Use Only. This document should not be distributed.
8. For pegging, follow the pegging tree for supplies and demands in different organizations and verify that the planning process followed the supply chain bill. The left most icon (Demand Pegging) is selected.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 42
For Instructor Use Only. This document should not be distributed.
10. Look at detailed information about some items in the plan. Right click item AS66311, and then select the Items > Items from the right-click menu. Review the information on the Items context window Use the buttons and the right-click menu options to find resource, component and supplier information. Refer to your supply chain bill diagram in your search and update it with information that is significant to note.
Notes:
Right click the Order Number column, and the select Folder > Show Field from the rightclick menu. In the Show Field window, set Find = %dat% Click Find. The Show Field window lists available fields.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 43
For Instructor Use Only. This document should not be distributed.
11. Find the Supply/Demand fields that relate to date. Look first at fields that display in the Supply/Demand window. Then look at those that do not display; differentiate between those that seem to relate to demands and those that relate to supplies.
For Instructor Use Only. This document should not be distributed.
Notes:
12. Click (B) Cancel. 13. View only the supply information and only the demand information for some items in the supply chain. From the Supply/Demand window, navigate (M) Tools > Supply From the Supply/Demand window, navigate and (M) Tools > Demand
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 44
14. View resource information in the supply chain. From the Supply/Demand window, navigate (M) Tools > Resources.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 45
For Instructor Use Only. This document should not be distributed.
Notes:
Notes:
Notes:
Close the Resource Requirements window. 16. View availability of some resources. Use Planner Workbench context window Resource Availability, accessible from the Resources window. Click Availability. The Resource Capacity window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 46
For Instructor Use Only. This document should not be distributed.
15. View requirements against some resources. Use Planner Workbench context window Resource Requirements, accessible from the Resources window. Click (B) Requirements. The Resource Requirements (TST:M1) window appears.
Close the Resource Capacity window. 17. View safety stock information for item AS66311 in organization D2. Use Planner Workbench context window Safety Stock. Select a supply/demand row, right click, and select Items.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 47
For Instructor Use Only. This document should not be distributed.
Notes:
For Instructor Use Only. This document should not be distributed. Notes:
The Safety Stock window is accessible from the Items window, click Safety Stock.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 48
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 49
For Instructor Use Only. This document should not be distributed.
18. View key indicators for the plan and some organizations, item categories, and items in the supply chain. In the Planner Workbench navigator, select the XX_Unconst plan, click the More icon, and select Key Indicators.
Then, repeat using some organizations, item categories, and items.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 50
For Instructor Use Only. This document should not be distributed.
Notes:
For Instructor Use Only. This document should not be distributed.
Lesson 3 - Unconstrained Plans
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 51
Viewing Unconstrained Plan Options Overview This practice covers viewing unconstrained plan options.
Tasks
Instance:Organization TST:M1 1. From the Advanced Supply Chain Planner responsibility, navigate to the Plan Options window in the Instance:Organization TST:M1. (N) Supply Chain Plan > Options 2. Select your plan, XX_Unconst. 3. In the Main tabbed region, what are the values of: Planned Items _________________ Material Scheduling Method _________________ Assignment Set _________________ Demand Priority Rule _________________ Overwrite _________________ Append Planned Orders _________________ Schedule By _________________ Enable Pegging _________________ 4. In the Organization tabbed region, what are the values of: Organizations _________________ Net WIP _________________ Net Reservations _________________ Net Purchases _________________ Plan Safety Stock _________________ Demand Schedules _________________ 5.
In the Constraints tabbed region, what are the values of: Constrained Plan _________________ Calculate Resource Requirements _________________
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 52
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solutions: Viewing Unconstrained Plan Options Responsibility = Advanced Supply Chain Planner
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1 1. From the Advanced Supply Chain Planner responsibility, navigate to the Plan Options window in the TST:M1 Instance:Organization. (N) Supply Chain Plan > Options 2. On the Find Plan window, select your plan XX_Unconst.
Notes:
Click OK.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 53
Notes:
In the Main tabbed region, what are the values of: − Planned Items _________________ − Material Scheduling Method _________________ − Assignment Set _________________ − Demand Priority Rule _________________ − Overwrite _________________ − Append Planned Orders _________________ − Schedule By _________________ − Enable Pegging _________________
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 54
For Instructor Use Only. This document should not be distributed.
3. The Plan Options (TST:M1) window opens to the Main tab.
Notes:
Organizations Net WIP Net Reservations Net Purchases Plan Safety Stock Demand Schedules
_________________ _________________ _________________ _________________ _________________ _________________
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 55
For Instructor Use Only. This document should not be distributed.
4. In the Organization tabbed region, what are the values of:
Notes:
Constrained Plan Calculate Resource Requirements
_________________ _________________
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 56
For Instructor Use Only. This document should not be distributed.
5. In the Constraints tabbed region, what are the values of:
For Instructor Use Only. This document should not be distributed.
Lesson 4 - Demand and Supply
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 57
Practice - Reviewing Demand and Supply Overview This practice covers reviewing demand and supply information.
Tasks
Instance:Organization = TST:M1 1. Navigate to the Planner Workbench window. 2. Select plan XX_Unconstr. 3. In the Planner Workbench navigator, select item AS66331 in organization TST:M1 while viewing by Organizations. 4. View the planned orders and their demands for item in AS66311 in organization M1. 5. In plan XX_Unconstr, view on-hand for AS66311. 6. View the scheduled receipts (buy from) for items in plan XX_Unconstr. 7. View the scheduled receipts (make at) for items in plan XX_Unconstr. 8. View the scheduled shipments (transfer from) for items in plan XX_Unconstr. 9. View sales orders and forecasts for AS66311. 10. View consumption against a forecast for AS66311. 11. In plan XX_Unconstr, view pegging for an AS66311 demand.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 58
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
1. From the Advanced Supply Chain Planner responsibility, Instance:Organization TST:M1, navigate to the Planner Workbench window. (N) Supply Chain Plan > Workbench > (T) Plans 2. On the Plans tab of the Navigator window, View by = Organizations Expand the Plans directory Expand plan XX_Unconstr 3. Expand Instance: Organization TST:M1 Expand item category COMPUTER.VPADELITE Select item AS66311
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 59
For Instructor Use Only. This document should not be distributed.
Solution – Reviewing Demand and Supply
Notes:
5. In plan XX_Unconstr, view on-hand for AS66311. Navigate Tools > On Hand. The On hand (TST:M1) window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 60
For Instructor Use Only. This document should not be distributed.
4. To view the planned orders and their demands for item in AS66311 in organization M1, select the Supply/Demand icon.
Close the On hand inventory window. 6. View the scheduled receipts (buy from) for items in plan XX_Unconstr. In organization TST:M1, expand plan XX_Unconst to a buy item, such as COMPONENT.ELECTRICAL>CM66321. Click the Supply/Demand icon. Select the item. Navigate (M) View > Find. The Find Supply/Demand window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 61
For Instructor Use Only. This document should not be distributed.
Notes:
Close the Supply/Demand window. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 62
For Instructor Use Only. This document should not be distributed.
Set the following values: − Criteria = Order Type − Condition = Among − Among = Purchase requisition, Purchase order (B) Click Find. Purchase requisitions and purchase orders for the selected item appear in the Supply/Demand window.
10. To view consumption against a forecast for AS66311. Highlight a row that has Order Type: forecast Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 63
For Instructor Use Only. This document should not be distributed.
7. View scheduled receipts (make at) for items in plan XX_Unconstr: Expand plan XX_Unconstr to a make item, such as COMPUTER.VPADELITE > AS66311. Click the Supply/Demand icon. Select the item. Navigate (M) View > Find… − Criteria = Order Type − Condition = Equals − From = Work Order 8. View the scheduled receipts (transfer from) for items in plan XX_Unconstr − Expand plan XX_Unconstr to item AS66311 under org TST:D2. − Click icon Supply/Demand − Select the item − (M) View > Find… − Criteria = Order Type − Condition = Equals − Among = In-transit Shipment 9. To view sales orders and forecasts for AS66311 under org TST:D2. Click the Supply/Demand icon. The Supply Demand (TST:M1) window appears. Navigate (M) Tools > Demand. The Demand (TST:M1) window appears.
The Consumption Details window appears.
Close the Consumption Details window. 11. Returning to the Demand window for plan XX_Unconstr, item AS66311, view pegging for a demand. Highlight a row for a Demand. In the Pegging region, expand the pegging tree and view each entry. See also Solution steps # 8, 9, and 10 in the Practice – Researching Planning Results.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 64
For Instructor Use Only. This document should not be distributed.
Right click the forecast, and then select Consumption Details from the right-click menu.
For Instructor Use Only. This document should not be distributed.
Lesson 5 - Modeling the Supply Chain
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 65
Practice: Defining an Item Attribute Simulation Set Overview
Tasks Responsibility: Advanced Supply Chain Planner Instance:Organization TST:M1 1. From the Advanced Supply Chain Planner Responsibility, navigate to the Item Attributes Mass Maintenance window. 2. Create a new simulation set. Navigate to return to the Item Attributes Mass Maintenance window. 3. Enter the following information: Item Simulation Set Name: XX_Increase LT Description: Increase LT by 20% for Buy Items. 4. In the Find region, select the All radio button. Click (B) Find. 5. In the Find Items window, set the following Criteria / Condition / From values: Original Make or Buy / Equals / Buy Original Planner / Equals / J. Smith Org(anization) / Equals / TST:M1 Original Processing LT / Less Than / 25 Item / Starts with / CM66 6. In the selection table, select several items, such as CM66321, CM66333, and CM66326. 7. In the Item attributes available for update region, set the following Attribute Name / Condition / Attribute Values: Processing LT / Increase Original by Percentage / 20 8. Find your existing Item Simulation Set Name. Find items that match the following Criteria / Condition / From values: Original Make or Buy / Equals / Buy Original Planner / Equals / J. Smith Org(anization) / Equals / TST:M1 Processing LT / Greater Than / 2 9. You can modify this simulation set. 10. In the Item attributes available for update region enter the Attribute Name for an attribute that you want to update, such as: Attribute Name: Post processing. LT. Condition: Set value to Attribute Value: 6 Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 66
For Instructor Use Only. This document should not be distributed.
In this practice you: • Create a new Item Attribute Simulation Set. • Modify an existing Item Attribute Simulation Set. • Use the Plan Options form to assign the new Item Attribute Simulation Set to a plan.
For Instructor Use Only. This document should not be distributed.
11. From the Advanced Supply Chain Planner responsibility, navigate to the Plan Options for your XX_Uncontr plan in Instance:Organization TST:M1. Select your plan 12. In the Item Simulation Set field, select your simulation set. Save your work.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 67
Solutions: Defining an Item Attribute Simulation Set
For Instructor Use Only. This document should not be distributed.
1. From the Advanced Supply Chain Planner Responsibility, navigate to the Item Attributes Mass Maintenance window. − Setup > Item Attribute Mass Maintenance The Item Attribute Mass Maintenance window appears.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 68
2. Enter the following information: Item Simulation Set Name: XX_Increase LT Description: Increase LT by 20% for Buy Items.
4. In the Find Items window, set the following Criteria / Condition / From values: − Original Make or Buy / Equals / Buy − Original Planner / Equals / J. Smith − Org(anization) / Equals / TST:M1 − Original Processing LT / Less Than / 25 − Item / Starts with / CM66 Click (B) Find The Item Attributes Simulation Set window populates. 5. In the selection table, select several items, such as CM66321, CM66333, and CM66326. 6. In the Item attributes available for update region, set the following Attribute Name / Condition / Attribute Values: − Processing LT / Increase by Percentage / 20 Click (B) Apply. Close the Item Attributes Maintenance window.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 69
For Instructor Use Only. This document should not be distributed.
3. In the Find region, select the All radio button. Click (B) Find.
7. Find the Simulation Set that you just created. Open the Item Attribute Mass Maintenance Form. (N) Setup > Item Attribute Mass Maintenance. (M) View > Find From the list of values select XX_Increase LT (B) OK In the Find Items region, select All (B) Find. The Find Items window opens. Input the following values for the Criteria/Condition/From Values: Original Make or Buy / Equals / Buy Original Planner / Equals / J. Smith Organization / Equals / TST:M1 Original Processing LT / Less Than / 25 Item / Starts With / CM66 Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 70
For Instructor Use Only. This document should not be distributed.
Notes:
8. Use Query functionality to find your existing Item Simulation Set Name. Press the
key. In the Item Simulation Set Name field, type “%”. Press . The Item Simulation Set Name field populates with the first of several retrieved simulation sets. The example used for creating the solution screen captures is: − Item Simulation Set Name: XX_Increase LT − Description: Increase LT by 20% for Buy Items Work with your Item Simulation Set Name. To find already updated items in the simulation set, in the Find Items region, select the All radio button. Click (B) Find. The Find Items window appears in front of the Item Attribute Mass Maintenance window. Set the following Criteria / Condition / From values: − Original Make or Buy / Equals / Buy − Original Planner / Equals / J. Smith − Org(anization) / Equals / TST:M1 − Original Processing LT / Less Than / 25 − Item / Starts with / CM66
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 71
For Instructor Use Only. This document should not be distributed.
(B) Find The Items region of the form is populated with the Items that meet the criteria. Scroll through the list of items. The magenta text color indicates that these records have already been modified. For example, the original Processing Lead Time for several items is 20. The Processing LT for this simulation set for those same items is 24, which is a 20% increase in lead time.
Click (B) Find. The Item Attribute Mass Maintenance window populates.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 72
For Instructor Use Only. This document should not be distributed.
Notes:
The magenta text font color indicates that these records have already been modified. For example, the original Processing Lead Time for several items is 20. The Processing LT for this simulation set for those same items is 24, which is a 20% increase in lead time. 9. You can modify this simulation set. Select the check box for a few items, such as CM66321 and CM66331. 10. In the Item attributes available for update region enter the Attribute Name for an attribute that you want to update, such as: − Attribute Name: Post processing. LT. − Condition: Set value to − Attribute Value: 6
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 73
For Instructor Use Only. This document should not be distributed.
Notes:
Click Apply. The attribute values are modified for this simulation set. The Original value is not updated.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 74
For Instructor Use Only. This document should not be distributed.
Notes:
11. Close the Item Attributes Mass Maintenance window. From the Advanced Supply Chain Planner responsibility, navigate to the Plan Options for your XX_Uncontr plan in Instance:Organization TST:M1. − Supply Chain Plan > Options The Find Plan window appears.
Notes:
Select your plan, and then click OK. The Plan Options window appears for your plan.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 75
For Instructor Use Only. This document should not be distributed.
Notes:
Notes:
Save your work. Close the Plan Options window.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 76
For Instructor Use Only. This document should not be distributed.
12. In the Item Simulation Set field, select your simulation set.
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 77
Guided Demonstration - Sourcing Overview This lecture demonstration covers sourcing. 1. 2. 3.
4.
5.
Navigate to the Planner Workbench form: (N) Supply Chain Plan > Workbench Select the Plan Tab. View by = Organizations Expand the Plans directory: Plans directory Plan XX_Unconst Instance:Organization TST:D2 Item Category: COMPUTER.VPADELITE To view the sourcing for item AS66311 in organization D2: Select item AS66311 Click the Items icon Click the Sources button.
Allocating Demand to Suppliers 6. View the Sourcing Rule form: (N) Sourcing > Sourcing Rules The Sourcing Rule (TST:M1) window appears. 7. From the menu bar, navigate: (M) View > Find The Sourcing Rules / BOD window appears. 8. Demonstrate how to define a rank for each source of supply named in the sourcing rules. You can then define a sourcing percentage for each source within a rank, allowing you to allocate a portion of the total orders to each source. Sourcing Splits 9. Specify the sourcing Allocation Percentages in the Sourcing Rule form using the Allocation % field. 10. Review some of the System Profile Options that impact sourcing. Change your responsibility to System Administrator. (N) Profile > System. When the Find System Profile Values window opens, enter MSO%Sourcing% in the Profile field and click (B) Find. One of the profile options that you will retrieve will be MSO: Sourcing Allocation Window. The default is set to 7 days. The Sourcing Allocation Window profile is used to specify a length of time (in days) used to satisfy allocation percentages. The sourcing constraints are enforced in a rolling horizon manner, in multiples of the Sourcing Allocation Window. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 78
For Instructor Use Only. This document should not be distributed.
Tasks
Bills of Distribution 12. Access the Bills of Distribution form: (N) Supply Chain Planning > Sourcing > Bills of Distribution 13. Assign bills of distribution to: Items Item in an organization Categories of items in organizations Organization Instances
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 79
For Instructor Use Only. This document should not be distributed.
11. Query some additional profile options which affect the behavior of sourcing splits, for example: MSC: Sourcing Variance Tolerance – can be used to specify the tolerance band for the difference between the user-specified allocation percentages and the planderived allocation percentages. If the difference is greater than the tolerance, then an exception is triggered. MSC: Start Date Offset for Sourcing History (in months) – can be used to specify a global allocation percentages start date from which the sourcing history is collected and accumulated for making sourcing decisions. The default value is Null (the system collects all history if the collection parameter Recalculate History is set to Yes).
Practice - Modeling the Supply Chain Overview This practice covers modeling the supply chain.
Tasks
Instance:Organization = TST:M1 1. View instance/organization codes. 2. Navigate to the Planner Workbench window. 3. Select plan XX_Unconst. 4. View the sourcing for item AS66311 in organization D2 5. Where does AS66311 come from? 6. What type of rule sets this sourcing and what is it’s name? 7. View the sourcing rule. 8. View the sourcing for item AS66311 in organization M1. 9. Where does AS66311 come from? 10. What type of rule sets this sourcing and what is its name? 11. View the sourcing rule. 12. View the sourcing for item CM66321 in organization M1. 13. Where does CM66321 come from? 14. What type of rule sets this sourcing and what is it’s name? 15. What is the allocated order quantity from each supplier of CM66321? 16. View the sourcing rule. 17. What is the assignment set for plan XX_Unconst? 18. View the assignment set and the entries for AS66311 in TST:D2 and TST:M1, CM66321 in TST:M1, and any other items that you want. 19. Using your supply chain bill diagram, view the sourcing for the supply chain bill that begins with item AS66311 in organization D2: 20. View sourcing information for some items in the supply chain. 21. View destination information for some items in the supply chain. 22. View the supplier capacity against CM66321 and any other items that you want. 23. View the lead times of AS66311 in organization M1 and any other items that you want. 24. View time fences for items in the AS66311 supply chain. 25. View in-transit lead times for the organizations in the AS66311 supply chain.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 80
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solution – Modeling the Supply Chain Responsibility: Advanced Supply Chain Planner
Notes:
The practices in this course are designed to work with Instance: Organization TST:M1. Select TST:M1. (B) Click OK. 2. View collected data for some of the entities in the SB66328 supply chain: Navigate to the Planner Workbench navigator. (N) Supply Chain Plan > Workbench. 3. Select the Plans Tab. View by = Organizations Expand: − Plans directory − Plan XX_Unconst − Instance:Organization TST:D2 Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 81
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1 1. View instance/organization codes. (N) Other > Change Instance/Organization
Notes:
(B) Click Sources The Sources (TST:M1) window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 82
For Instructor Use Only. This document should not be distributed.
− Item Category: COMPUTER.VPADELITE 4. To view the sourcing for item AS66311 in organization D2: Select item AS66311 Click the Items icon
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 83
For Instructor Use Only. This document should not be distributed.
5. Where does Item AS66311 come from? Answer: Transfer from Organization M1. Sourcing tabbed region > Source Org = TST:M1 Assignment Information tabbed region > Assignment Type = Transfer from
7. View the Sourcing Rule. (N) Sourcing > Sourcing Rules. The Sourcing Rule (TST:M1) window appears. From the menu bar, navigate: − (M) View > Find The Sourcing Rules / BOD window appears.
Select Xfer-M1, and then (B) click OK. The Sourcing Rule (TST:M1) window populates
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 84
For Instructor Use Only. This document should not be distributed.
6. What type of rule sets this sourcing and what is it’s name? Answer: Sourcing Rule name Xfer-M1. Sourcing tabbed region > Source Type = Sourcing Rule Assignment Information tabbed region > Sourcing Rule Type = Item Assignment Information tabbed region > Sourcing Rule Name = Xfer-M1 Close the Sources window. Close the Items window. Close the Navigator window.
8. View the sourcing for item AS66311 in organization M1. Navigate to the Planner Workbench navigator View by = Organizations Expand directory Plans Expand plan XX_Unconst Expand organization TST:M1 Expand item category COMPUTER.VPADELITE Select item AS66311 Click the Items icon Click Sources Select the Assignment Information tabbed region.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 85
For Instructor Use Only. This document should not be distributed.
Notes:
10. What type of rule sets this sourcing and what is its name? Sourcing tabbed region > Source Type = ___________________ Assignment Information tabbed region > Sourcing Rule Type = __________________ Assignment Information tabbed region > Sourcing Rule Name = __________________ (M) File > Close Form, and then to click OK when prompted to Close the Workbench. 11. View the sourcing rule. Select M-M1, and then (B) click OK. The Sourcing Rule (TST:M1) window populates Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 86
For Instructor Use Only. This document should not be distributed.
9. Where does AS66311 come from? Answer: Make at organization M1. Assignment Information tabbed region > Assignment Type Make At Sourcing tabbed region > Source Org TST:M1)
13. Where does CM66321 come from? Buy from (Assignment Information tabbed region > Assignment Type) Allied Manufacturing/SAN JOSE-ERS, rank 1 and Industrial Dressler, rank 2 (Sourcing tabbed region > Supplier/Supplier Site, Rank) Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 87
For Instructor Use Only. This document should not be distributed.
12. View the sourcing for item CM66321 in organization M1. Navigate to the Planner Workbench navigator View by = Organizations Expand directory Plans Expand plan XX_Unconst Expand organization M1 Select item category COMPONENT. ELECTRICAL Select item CM66321 Click the Items icon Click Sources
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 88
For Instructor Use Only. This document should not be distributed.
14. What type of rule sets this sourcing and what is it’s name? Sourcing tabbed region > Source Type = Sourcing rule Assignment Information tabbed region > Sourcing Rule Name B-Allied/Industrial 15. What is the allocated order quantity from each supplier of CM66321? Sourcing tabbed region > Allocated Qty
16. View the sourcing rule. (N) Sourcing > Sourcing Rules (M) View > Find Select B-Allied/Industrial
17. What is the assignment set for plan XX_Unconst? (N) Supply Chain Plan > Options On the Find Plan window, select XX_Unconst In the Main tabbed region, Assignment Set = TST:Supplier Scheduling
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 89
For Instructor Use Only. This document should not be distributed.
Notes:
Select TST:Supplier Scheduling and then click OK. The TST:Supplier Scheduling Assignment set appears. Set the cursor focus on the item/category field. (M) View Find − Item: AS66311 Click Find. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 90
For Instructor Use Only. This document should not be distributed.
18. View the assignment set and the entries for AS66311 in TST:D2 and TST:M1, CM66321 in TST:M1, and any other items that you want. In the previous instruction, from the Main tabbed region of Plan Options for the XX_Unconst plan field, we determined that the Assignment Set = TST:Supplier Scheduling. In Instruction 10, we determined that for AS66311 in TST:M1 − Sourcing Rule Type: Item-Org − Sourcing Rule Name: M-M1 (N) Sourcing > Sourcing Rules − (M) View > Find − Select M-M1 The Sourcing Rule window appears. − (B) Assignment Set The Assignment Sets window appears. This sourcing rule is used in many assignment sets.
For Instructor Use Only. This document should not be distributed.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 91
Assignment Set: TST:Supplier Scheduling Organization: TST:M1 Item AS66311 (B) Click View Indented Bill. The Object Navigator appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 92
For Instructor Use Only. This document should not be distributed.
19. To view the supply chain bill for item AS66311 in organization M1, navigate Sourcing > View Supply Chain Bill.
21. View destination information for some items in the supply chain. Use Planner Workbench context window Destinations, accessible from the Items window. Navigate as shown in the previous instruction, except on the Items (TST:M1) window, click (B) Destinations. 22. View the supplier capacity against CM66321 and any other items that you want. Navigate to the Planner Workbench navigator View by = Items Expand the Plans directory Expand plan XX_Unconst Expand item category COMPONENT. ELECTRICAL Expand item CM66321 Expand instance:organization TST:M1 Right-click Allied Manufacturing (SAN JOSE-ERS), and then select Supplier Information from the right-click menu. − View supplier capacity and supplier flexfences.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 93
For Instructor Use Only. This document should not be distributed.
20. View sourcing information for some items in the supply chain. Use Planner Workbench context window Sources, accessible from the Items window. (N) Supply Chain Plan > Workbench From the Navigator, expand Plans > XX_Unconst > TST:M1 > COMPUTER.VPADELITE > AS63311 Select AS66311, and then click the Items icon On the Items (TST:M1) window, click (B) Sources.
For Instructor Use Only. This document should not be distributed.
Notes:
Repeat for Industrial Dressler (US HEADQUARTERS) Item CM66321 item category is COMPONENT.ELECTRICAL
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 94
In organization M1: − Preprocessing LT: 0 − Processing LT: 1 − Postproc. LT: 0 − Fixed LT: 0 − Variable LT: 0 In organization D2: − Preprocessing LT: 0 − Processing LT: 5 − Postproc. LT: 0 − Fixed LT: 1 − Variable LT: 0 24. View time fences for items in the AS66311 supply chain. Navigate to the Planner Workbench navigator View by = Items Expand directory Plans Expand plan XX_Unconst Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 95
For Instructor Use Only. This document should not be distributed.
23. View the lead times of AS66311 in organization M1 and any other items that you want. Navigate to the Planner Workbench navigator View by = Items Expand directory Plans Expand plan XX_Unconstr Select item category COMPUTER.VPADELITE Select item AS66311, and then click the Items icon
Select Demand Time Fence Date, Demand Time Fence Days, Planning Time Fence Date, and Planning Time Fence Days
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 96
For Instructor Use Only. This document should not be distributed.
Select item category COMPUTER.VPADELITE Select item AS66311, and then click the Items icon On the Items window, click a cell in the Preprocessing LT column. (M) Folder >Show Field…
Item CM66321 item category is COMPONENT.ELECTRICAL Item CM66326 item category is COMPONENT.MECHANICAL Item CM66331 item category is COMPONENT.ELECTRICAL Item CM66332 item category is COMPONENT.ELECTRICAL Item CM66333 item category is COMPONENT.ELECTRICAL Item SB66328 item category is ASSEMBLY.SUBASSY 25. View in-transit lead times for the organizations in the AS66311 supply chain. (N) Setup > Transit Times Organization = TST:D2 Click Find In the Shipping Networks region, select From Org = TST:M1 View details in the Ship Methods region.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 97
For Instructor Use Only. This document should not be distributed.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 98
For Instructor Use Only. This document should not be distributed.
Check details for Organization = TST:M1 which receives from TST:M2 and TST:S1
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 99
For Instructor Use Only. This document should not be distributed.
Lesson 6 - Collections
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 100
Practice - Viewing Collections Overview This practice covers viewing collections.
Tasks
Instance:Organization = TST:M1 1. Navigate to Collections Workbench. 2. View collected data for the items in the SB66328 supply chain.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 101
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solution – Viewing Collections
Instance:Organization = TST:M1 1. Navigate to Collections Workbench. (N) Collections > View Collected Data 2. View the collected data for some of the entities in the SB66328 supply chain. View by = Items Expand Plans > Collection > ASSEMBLY.SUBASSY > SB66328 > TST:M1 Select the TST:M1 node, and then click the Items icon. Review the item information that has been collected. Is the leadtime information available? Why or why not? Return to the planner workbench navigator and click the Supply/Demand icon for item SB66328 in TST:M1. Review the supply and demand information that has been collected. What kinds of supplies and demands are displayed? Did you see any planned orders? Why or why not? Return to the planner workbench navigator, and select item SB66328. Right-click and select Resources>Resources. Review the resource availability and resource requirements information that has been collected. 3. Review the resource availability and resource requirements information that has been collected.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 102
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 103
For Instructor Use Only. This document should not be distributed.
Click Items icon and review data, then Supply/Demand icon and review data. For the department and resource of SB66328, right-click and select Resources from the Resources menu. The Resources window appears.
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 104
For Instructor Use Only. This document should not be distributed.
Lesson 7 - Analyzing Unconstrained Plans
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 105
Practice - Analyzing Supply and Demand Overview This practice covers analyzing supply and demand.
Tasks
Instance:Organization = TST:M1 1. Navigate to the Planner Workbench window. 2. Select plan XX_Unconst. 3. Re-view Planner Workbench Supply/Demand context window. 4. View exception messages for your unconstrained plan 5. Create an item personal query. 6. Create a resource personal query. 7. Create an exception personal query. 8. Create a supplier personal query. 9. Create exception personal queries using “days from today” criteria. Responsibility: Manufacturing and Distribution Manager Instance:Organization = M1 10. View exception sets. 11. In addition to exception sets, what other setting need to be in place for the planning engine to issue exception messages? Responsibility: Advanced Supply Chain Planner Instance:Organization = TST:M1 12. View unconstrained exception messages Resource overloaded for resource CHIPMOUNT1 in organization S1. How often do the exception messages appear? When does the first exception message occur? 13. Resolve one Resource overloaded exception message. 14. View unconstrained exception messages Supplier capacity overloaded for item CM66321 in organization M1. How often do the exception messages appear? When does the first exception message occur? 15. Resolve one Supplier capacity overloaded exception message.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 106
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solution – Analyzing Supply and Demand
Instance:Organization = TST:M1 1. Navigate to the Planner Workbench window. (N) Supply Chain Plan > Workbench 2. Select plan XX_Unconstrnd. View by = Items Expand directory Plans Select plan XX_Unconst 3. Re-view Planner Workbench Supply/Demand context window. Expand directories until you reach some items in the supply chain Item CM66321 item category is COMPONENT.ELECTRICAL Item CM66326 item category is COMPONENT.MECHANICAL Item CM66331 item category is COMPONENT.ELECTRICAL Item CM66332 item category is COMPONENT.ELECTRICAL Item CM66333 item category is COMPONENT.ELECTRICAL Item SB66328 item category is ASSEMBLY.SUBASSY In the Planner Workbench navigator, click icon Supply/Demand 4. View exception messages for your unconstrained plan (N) Supply Chain Plan > Workbench View by = Actions Expand directory Plans Select plan XX_Unconst and right-click Exceptions > Summary View exception groups that pertain to this plan Expand exception groups and double-click on exception message names to view the exception messages for the plan Navigate to the Planner Workbench navigator and re-select plan XX_Unconst Click icon Exceptions. The Find Exceptions window opens. Criteria = Planner Condition = Equals From = J. Smith (B) Find 5. Create an item personal query. (N) Supply Chain Plan > Workbench Select tab Queries
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 107
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 108
For Instructor Use Only. This document should not be distributed.
Expand Personal Queries > Item Click icon Create Query
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 109
For Instructor Use Only. This document should not be distributed.
Query Name = XX_Item Query Criteria = Planner Condition = Equals From = J. Smith Criteria = Organization Condition = Equals From = TST:M1 Click the Save button Click Execute Choose the plan name ‘XX_Unconst’ (B) OK Select Item SB66328, then click icon Horizontal Plan to view the details.
(N) Supply Chain Plan > Workbench Select tab Queries Click Personal Queries > Resource Click icon Create Query Query Name = XX_Resource Query Criteria = Organization Condition = Equals From = TST:S1 Click the Save button Click Execute Choose Plan XX_Unconst (B) OK Select Resource CHIPMOUNT1, then click icon Horizontal Plan Return to the Planner Workbench navigator query results, Select Resource CHIPMOUNT1, then click icon More Select Resource Availability 7. Create an exception personal query.
(N) Supply Chain Plan > Workbench Select tab Queries Click Personal Queries > Exception Click icon Create Query Query Name = XX_Exception Query In the Exceptions region, select Resource overloaded In the Criteria region, Criteria = Resource Condition = Starts With From = CHIPMOUNT Click the Save button Click Execute Choose Plan = XX_Unconst (B) OK Click Exception Resource overloaded To view the Exception Details, click on the Resource Overloaded Exception, then rightclick and select Exceptions – All 8. Create a supplier personal query.
(N) Supply Chain Plan > Workbench (T) Queries Click Personal Queries > Supplier Click the Create Query icon Query Name = XX_Supplier Query Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 110
For Instructor Use Only. This document should not be distributed.
6. Create a resource personal query.
Responsibility: Manufacturing and Distribution Manager Instance: Organization = TST:M1 9. View exception sets. (N) Material Planning > Setup > Exception Set (N) View > Find… Select exception set ASCP and view the information. Then, select exception set ES-ASCP (ES is CASE sensitive) and compare the information to exception set ASCP. 10. In addition to defining the exception sets, what other setting need to be in place for the planning engine to issue exception messages? Each item assigned to an exception set. Each resource assigned to an exception set. Responsibility: Advanced Supply Chain Planner Instance: Organization = TST:M1 11. View unconstrained exception messages Resource overloaded for resource CHIPMOUNT1 in organization S1. How often do the exception messages appear? When does the first exception message occur? (N) Supply Chain Plan > Workbench Select tab Plans View By = Actions Expand directory Plans. Select plan XX_Unconst. Expand version Current. Expand exception group Material and Resource Capacity Exceptions. Expand exception message Resource overloaded. Expand instance:organization TST:S1 Expand department SURF MOUNT. Right-click resource CHIPMOUNT1 and select Exceptions > Detail. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 111
For Instructor Use Only. This document should not be distributed.
Criteria = Approved Supplier Condition = Among From = Advanced Network Devices, Industrial Dressler, Allied Manufacturing Click OK to close the Among window. Criteria = Planner Condition = Equals From = J. Smith Click the Save button Click the Execute button If prompted to choose a plan, select XX_Unconst and click OK. Find the record for the supplier Allied Manufacturing for item CM66321 in TST:M1. Select it then right-click and choose Supplier Information.
Note how often the messages occur. Note the date of the first exception message.
Navigate to the Exception Details window. Select the exception message (not the first one). Right-click and select Resource Availability. Note when the resource works (shifts and hours) on the resource requirement date. Navigate to the Exception Details window. Right-click and select Resource Requirements. Note how many resource requirements are scheduled on the resource requirement date. Select one of them. Click (B) Supply. Find the source of the resource requirement. Expand the pegging tree through the supply chain to determine the ultimate demand for this resource requirement. Navigate to the Planner Workbench navigator. Right-click the resource and select Horizontal Plan > Default. Note the resource overload on the resource requirement date. At this point a planner might run a simulation to see the impact of the various alternatives. Navigate to the Exception Details window. Select the original exception message. Right-click and select Resource Availability. Navigate to the Update Resource region, enter as many lines as you need. Update Mode = Add Capacity Enter From Date, To Date, Shift Num 13. View unconstrained exception messages Supplier capacity overloaded for item CM66321 in organization M1. How often do the exception messages appear? When does the first exception message occur? (N) Supply Chain Plan > Workbench Select tab Plans. View By = Actions Expand directory Plans. Select plan XX_Unconst. Expand version Current. Expand exception group Material and Resource Capacity Exceptions. Expand exception message Supplier capacity overloaded. Expand instance: organization TST:M1. Right-click item CM66321 and select Exceptions > Detail. Note how often the messages occur. Note the date of the first exception message. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 112
For Instructor Use Only. This document should not be distributed.
12. Resolve one Resource overloaded exception message.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 113
For Instructor Use Only. This document should not be distributed.
14. Resolve one Supplier capacity overloaded exception message. Click Supplier. Note the supplier capacity for the requirement date. Navigate to the Exception Details window and click Supply/Demand. Note the quantity of the planned order due on the requirement date. Expand the pegging tree through the supply chain to determine the ultimate demand for this requirement. Navigate to the Planner Workbench navigator . View By = Suppliers Select plan XX_Unconst. Expand directories until you reach the supplier from the exception message. Right-click the item and select Horizontal Plan > Default. View the horizontal plan for the requirement date. Note the overload. Decide whether to reduce the forecast, increase the supplier capacity, or source to another supplier. You decide to increase the supplier capacity. If you decide to reduce the forecast, you need to do so in the source instance or in Oracle Demand Planning. If you decide to source to another supplier, you can select another supplier when you release the planned order. Or, you can reduce the quantity of this planned order, create a firm planed order for the remaining quantity, select another supplier, and release. To affect a permanent solution, change the approved supplier list sourcing information. Navigate to the Exception Details window. Select the original exception message. Click Suppliers. In the Supplier Capacity tabbed region, enter the new capacity.
Practice - Releasing Recommendations Overview This practice covers processing recommendations.
Tasks
Instance:Organization = TST:M1 1. Navigate to the Planner Workbench window. 2. Select plan XX_Unconst. 3. Find the planned orders scheduled to start between two dates for planner J. Smith. 4. Release at least one make at and one buy from planned order. Change the quantity on one of the planned orders that you release and change the date on another planned order that you release.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 114
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solution – Releasing Recommendations
Instance:Organization = TST:M1 1. Navigate to the Planner Workbench window. (N) Supply Chain Plan > Workbench 2. Select plan XX_Unconst. Expand the Plans directory Click on the XX_Unconst plan. 3. Find the planned orders scheduled to start between two dates for planner J. Smith. Right-click plan XX_Unconst and select Supply and Demand>Supply Click in Sugg Due Date of the first supply (N) Folder > Show Fields… Select Sugg Order Date (N) View > Find… Criteria = Planner Condition = Equals From = J. Smith Criteria = Order Type Condition = Equals From = Planned order Criteria = Suggested Order Date Condition = Between From = To = 4. Release at least one make at and one buy from planned order. Change the quantity on one of the planned orders that you release and change the date on another planned order that you release. For each order that you want to release, select For Release. Navigate to the Release Properties tabbed region. For at least one make at planned order, change Implement Date. For at least one buy from planned order, change Implement Qty/Rate. Click icon Save. Right-click in a field in the Release Properties tabbed region and select Release.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 115
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 116
For Instructor Use Only. This document should not be distributed.
Lesson 8 - Constrained Plans
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 117
Practice - Setting Up Constrained Plans Overview This practice covers reviewing constrained plans.
Tasks
Instance:Organization = TST:M1 1. View the constrained plan options. 2. Which type of plan is this? 3. Find and note at least five similarities or differences between the plan options for this plan and your XX_Unconst plan in the Main, Aggregation, and Organizations tabbed regions. 4. View manufacturing, supplier, shipping, receiving, and carrier calendars. 5. Find a planned order for a make at item. Confirm that it meets lead times, resource hours, and resource availability. 6. Find a planned order for a buy from item. Confirm that it meets lead times and supplier capacity. 7. In general, if supplier capacity is 100 per day and you run a plan at 0001 hours, how much capacity does the supplier show on the third day?
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 118
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solution – Reviewing Constrained Plans Responsibility: Advanced Supply Chain Planner
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1 1. View the constrained plan options. (N) Supply Chain Plan > Names Select plan Const-Cap.
Notes:
Click Plan Options.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 119
2. Which type of plan is this? Navigate to the Constraints tabbed region. − The Constrained Plan check box is selected. − The Enforce Capacity Constraints radio button is selected.
Navigate to the Decision rules tabbed region. − The Decision Rules check boxes are not selected. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 120
For Instructor Use Only. This document should not be distributed.
Notes:
Answer: Therefore, the Plan Const-Cap is a Constrained - Enforce capacity constraints plan without decision rules. 3. Find and note at least five similarities or differences between the plan options for this plan and your XX_Unconst plan in the Main, Aggregation, and Organizations tabbed regions. Notes:
4. Which View manufacturing, supplier, shipping, receiving, and carrier calendars. Navigate to the Planner Workbench navigator. − View by = Items Expand the Plans directory. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 121
For Instructor Use Only. This document should not be distributed.
Navigate to the Optimization tabbed region. − The Optimize check box is not selected.
Notes:
Select Work Dates. Click OK. View the manufacturing calendar. − Calendar Type = Manufacturing − Scope = Organization − Organization = TST:M1 − (B) Click Refresh
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 122
For Instructor Use Only. This document should not be distributed.
Select plan Const-Cap. (M) Tools > Work Dates…
View the supplier calendar. − Calendar Type = Capacity − Scope = Supplier − Supplier = Allied Manufacturing − Supplier Site = SAN JOSE – ERS − Item = CM66321 − Click Refresh View the shipping calendar from supplier. − Calendar Type = Shipping − Scope = Supplier/Supplier site − Supplier = Allied Manufacturing − Supplier Site = SAN JOSE – ERS − Click Refresh View the shipping calendar from other organization. − Calendar Type = Shipping − Scope = Organization − Organization = TST:S1 − Click Refresh Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 123
For Instructor Use Only. This document should not be distributed.
Notes:
(B) Click Routing Operations.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 124
For Instructor Use Only. This document should not be distributed.
View the receiving calendar at other organization − Calendar Type = Receiving − Scope = Organization − Organization = TST:D2 − Click Refresh 5. Find a planned order for a make at item. Confirm that it meets lead times, resource hours, and resource availability. − (N) Supply Chain Plan > Workbench − View By = Items Expand plan Const-Cap. − Expand item category COMPUTER.VPADELITE. − Expand item AS66311. − Highlight, and then right-click instance: organization TST:M1. From the right-click menu, select Items > Items. − Note the Processing lead time: 1 day
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 125
For Instructor Use Only. This document should not be distributed.
(B) On Routing Operations (TST:M1), highlight the row for Item CM66321. Click (B) Resources. − Note the resource usage for the resource. 0.008 hours per item
Notes:
Calculate the resource load. − (Routing resource usage per piece * Planned order number of pieces) − (0.008 * 700) = 5.6 hours Note: With the default environment settings, you may see routing resources as 0.0. To correct this, change the decimal places setting under Tools > Preferences for the default preference set under the Materials Plan tab. Right-click the planned order and select Calendar > Organization Manufacturing Calendar. − Note whether the planned order is due on a workday. − In this example, the Suggested Due Date is Wednesday, May 23, 2007, which is a workday.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 126
For Instructor Use Only. This document should not be distributed.
Return to the Planner Workbench Navigator. Right-click organization M1 under item AS66311 and select Supply/Demand > Supply. Find a planned order against item AS66311, note the Suggested Due Date and Quantity.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 127
For Instructor Use Only. This document should not be distributed.
Return to the Supply window at organization M1 under item AS66311.
Notes:
− Note whether Resource Hours meet your calculated resource load. − If calculated resource load does not match resource hours, it may be because of efficiency and utilization factors (Adjusted Resource Hours and Touch Time). A mismatch also could occur when a plan schedules in days and modifies the resource hours by the calculation 24 / Total Available hours, for example 24 / 16 = 1.5. Return to the Planner Workbench Navigator. − Highlight item AS66311 under M1, and then right-click and select Resources > Resources. − On the Resources form, click (B)Availability. − On the Resource Capacity form, select the date that corresponds to the resource requirement date.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 128
For Instructor Use Only. This document should not be distributed.
Right-click the planned order and select Resource Requirements; note Start Date, End Date, and Resource Hours.
− Note the Total Available resource hours. 6. Find a planned order for a buy from item. Confirm that it meets lead times and supplier capacity. − (N) Supply Chain Plan > Workbench − View By = Items Expand plan Const-Cap. Expand item category COMPUTER.VPADELITE. Expand item AS66311. Expand organization M1. Highlight, and then right-click component CM66321. From the right-click menu, select Items > Items.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 129
For Instructor Use Only. This document should not be distributed.
Notes:
− Note the Processing Lead Time is 20 days. Navigate to the Planner Workbench navigator. Highlight, and then right click item CM66321. From the right-click menu, select Supply/Demand > Supply. − Find planned orders against item CM66321. Select the Sugg Due Date column − (M) Folder > Show Field… − Select Sugg Start Date Select the Order Number column − (M) Folder > Show Field… − Select Source Supplier − Select Source Supplier Site
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 130
For Instructor Use Only. This document should not be distributed.
Notes:
− The planned orders start and are due on workdays − The planned orders meet lead time − Notice the planned orders are sourced from Allied Manufacturing, SAN JOSE-ERS Navigate to the Planner Workbench navigator − Expand item category COMPONENT.ELECTRICAL Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 131
For Instructor Use Only. This document should not be distributed.
Note the planned order start and due dates. ______________ ________________ − Right-click the planned order and select Calendar > Organization Receiving Calendar.
− The supplier capacity for the period of the planned orders is 400 per day − The planned orders are within supplier capacity 7. In general, if supplier capacity is 100 per day and you run a plan at 0001 hours, how much capacity does the supplier show on the third day? − The supplier shows 200 on the third day. Supplier capacity is as of 0000 hours each day. If the plan ran at 0001 hours, the first day shows no supplier capacity, the second day 100, and the third day 200.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 132
For Instructor Use Only. This document should not be distributed.
− Expand item CM66321 − Highlight, and then right click Allied Manufacturing. From the right-click menu, select Supplier Information.
For Instructor Use Only. This document should not be distributed.
Lesson 9 - Querying Supply Chain Plan Information
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 133
Practice - Filtering Exception Messages Using Queries Overview This practice covers filtering exception messages using queries. • • •
Log on using the seeded Advance Supply Chain Planner responsibility. Your instructor will provide login information. You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks Responsibility: Advanced Supply Chain Planner Instance: Organization = TST:M1 1. View instance/organization codes. 2. Navigate to the Planner Workbench window. 3. Create and execute a personal query named XX_FiltExcep to filter the following exception messages for planner J.Smith: Late replenishment for sales order Sales order/forecast at risk due to material shortage Items below safety stock Past due orders
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 134
For Instructor Use Only. This document should not be distributed.
Assumptions
Solution - Filtering Exception Messages Using Queries Responsibility: Advanced Supply Chain Planner
2. 3.
The practices in this course are designed to work with Instance: Organization TST:M1. Select TST:M1. (B) Click OK. Navigate to the Planner Workbench window. (N) Supply Chain Plan > Workbench Create and execute a personal query named XX_FiltExcep to filter the exception messages for planner J. Smith. Click the Create Query icon. The Create Query window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 135
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1 1. View instance/organization codes. (N) Other > Change Instance/Organization
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 136
For Instructor Use Only. This document should not be distributed.
Input the following information in the Create Query window: Query Name: XX_FiltExcept Query Type: Exceptions Exception= Late Replenishment for Forecast Critera= Item Condition=Starts With From=AS Exception=Past Due Orders Criteria=Planner Condition=Equals From= J. Smith Click the Save button. Click the Execute button. If prompted for a plan name, select Const-Cap and click OK. (B) Click Save. (B) Click Execute.
Practice - Order Query Setup and Process Overview This practice covers: • Setting up order queries using Advance Supply Chain Planning Planner Workbench. • Executing order queries. Log on using the seeded Advance Supply Chain Planner responsibility. Your instructor will provide login information. You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
• • •
Tasks Responsibility: Advanced Supply Chain Planner Instance:Organization = TST:M1 1. View instance/organization codes. 2.
Navigate to the Planner Workbench window.
3.
Create a personal order query named XX_Order with the following criteria: Criteria
Condition
From
Order type
Equals
Purchase order
Supplier
Equals
Advanced Network Devices
Suggested Dock Date
Days From Today
10
Exception Name
Equals
Orders to be rescheduled in
Planner
Equals
J. Smith
4.
Execute XX_Order manually.
5.
Specify the Queries tabbed pane to be the default tab for the Planner Workbench.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 137
For Instructor Use Only. This document should not be distributed.
Assumptions
Solution - Order Query Setup and Process Responsibility: Advanced Supply Chain Planner
The practices in this course are designed to work with Instance: Organization TST:M1. Select TST:M1. (B) Click OK. 2.
Navigate to the Planner Workbench window. (N) Supply Chain Plan > Workbench
3.
Create a personal order query named XX_Order Click the Create Query icon. The Create Query window may appear (depending on your how your workbench preferences have been set). Input the following information in the Create Query window: Query Name = XX_Order Query Query Type = Orders Name = Industrial Dressler (Reschedule Out) Criteria = Order Type Condition = Equals From= Purchase Order Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 138
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1 1. View instance/organization codes. (N) Other > Change Instance/Organization
(B) Click Save. Close the Create Query window.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 139
For Instructor Use Only. This document should not be distributed.
Criteria = Supplier Condition = Equals From = Industrial Dressler Criteria = Exception Name Condition = Equals From = Orders to be Rescheduled Out Criteria = Planner Condition = Equals From = J. Smith
Execute XX_Order manually. On the Queries tab, expand Personal Queries > Order
Select the XX_Order Query. Click the Execute Query icon. The Plans window appears:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 140
For Instructor Use Only. This document should not be distributed.
4.
For Instructor Use Only. This document should not be distributed.
Select XX_Unconst in the Name field. (B) Click OK to run the query. Note: It is possible that this query will not retrieve any records, if there are no Reschedule Out messages in the plan that pertain to the specified supplier.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 141
For Instructor Use Only. This document should not be distributed.
Lesson 10 - Constrained Enforce Capacity Constraints Plans
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 142
Practice - Working with Enforce Capacity Constraints Plans I Overview This practice covers working with enforce capacity constraints plans.
Make a Copy of the Constrained Plan 1. Navigate to the Supply Chain Plan Names form. 2. Select plan 00_ECC and enter the information to copy the plan. Work With the ECC Plan 3. Navigate to the Planner Workbench window. 4. Select plan XX_ECC. 5. Resolve one Material constraint exception message. 6. View Constrained - Enforce capacity constraints exception message Resource constraint for resource CHIPMOUNT1 in organization S1. When does the first exception message occur? 7. Resolve one Resource constraint exception message. 8. Compare the three strategies for analyzing causes of late demands. Begin the comparison by trying the basic strategy--look over the late replenishment exception details. 9. Continue the comparison of the three strategies for analyzing causes of late demands. Try the more detailed strategy--analyze related exceptions to the late replenishment exception details. 10. Finish the comparison of the three strategies for analyzing causes of late demands. Try the most detailed strategy--use the late demand diagnosis capabilities of the Critical Path Gantt Chart view. Note some of its features. 11. Respond to recommendations.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 143
For Instructor Use Only. This document should not be distributed.
Tasks
Make a Copy of the Constrained Plan 1. After the instructor has rerun the collections, launch your XX_ECC plan again. (N) Supply Chain Plan > Launch In the Parameters window, enter your plan name XX_ECC. Accept the rest of the default parameters and click (B) OK. Click Submit, and then No when prompted to submit another request. Optionally, click (M) View > Requests to check on the status of your request. 2. After the request has been completed successfully, navigate to the Planner Workbench to observe the impact of the recommendations that you implemented. (N) Supply Chain Plan > Workbench Expand the XX_ECC plan to locate the items that you have adjusted in the previous lab. Are there any new recommendations for these orders? Work With your ECC Plan 3. Navigate to the Planner Workbench window. (N) Supply Chain Plan > Workbench 4. Select plan CONST-CAP. Navigate to the Planner Workbench Navigator Select tab Plans View By = Actions Expand directory Plans Select plan CONST-CAP 5. Resolve one Material constraint exception message. Expand version Current Expand exception group Material and Resource Capacity Exceptions Expand exception message Material constraint Expand instance:organization TST:M1 Right-click item CM66321 and select Exceptions > Detail
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 144
For Instructor Use Only. This document should not be distributed.
Solution – Working with Enforce Capacity Constraints Plans
7.
Analyze and resolve one Material constraint exception message. Select a material constraint exception message. Make note of the date that the constraint applies to. _______________________ Click Suppliers. What are the supplier and supplier sites that have a capacity constraint defined for item CM66321? _________________ What is the daily supplier capcity? _______________ Return to the Planner Workbench navigator. Right-click item CM66321 and select Bills of Material/Routing > Where Used. What is the usage of CM66321 in each AS66311 assembly? ______________ Close the Where Used form. Right click item CM66321 in the Workbench navigator and select Exceptions > Detail to return to the Exception Details form. Click (B) Supply/Demand Find the requirements listed for the day of the exception message. Return to the Planner Workbench navigator Change the View By option to Suppliers Expand directories Plans>Const-Cap>Allied Manufacturing (SAN JOSEERS)>COMPONENT.ELECTRICAL>CM66321 Select and right-click item CM66321 Select Horizontal Plan > Default View the overload on the supplier (Net Available Capacity, Cumulative Available Capacity) To resolve this exception message, a planner might decide to run simulations to see the impact of either increasing the supplier capacity, or perhaps adjust the forecast demand. This concept will be covered in the chapter on Simulations. View Constrained - Enforce capacity constraints exception message Resource constraint for resource CHIPMOUNT1 in organization S1. When does the first exception message occur? (N) Supply Chain Plan > Workbench Navigate to the Planner Workbench navigator Select tab Plans View By = Actions Expand directory Plans Select plan CONST-CAP Expand version Current Expand exception group Material and Resource Capacity Exceptions Expand exception message Resource constraint Expand instance:organization TST:S1 Expand department SURF MOUNT Right-click resource CHIPMOUNT1 and select Exceptions > Detail Select the first exception message Click Supply/Demand Right-click the order row and select Resource Requirements Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 145
For Instructor Use Only. This document should not be distributed.
6.
Analyze and resolve one Resource constraint exception message. Return to the exception details form. Right-click the Resource Constraint exception message and select Resource Availability What is the resource capacity (Hours Available) for CHIPMOUNT1 on the date of the exception message? _______ Which shifts is the CHIPMOUNT1 resource assigned to? ________________ Close the Resource Capacity form. From the Exception Details form, select (B) Supply/Demand. The planned order displayed is the one that relates to the exception message. Expand the pegging tree through the supply chain to determine the ultimate demand source for this resource requirement. Return to the Planner Workbench Navigator Change the View by option to Resources Expand the tree to select the CHIPMOUNT1 resource (Plans>ConstCap>TST:S1>Production>SURF MOUNT>CHIPMOUNT1) Right-click the CHIPMOUNT1 resource and select Horizontal Plan > Default View the resource load on the day of the exception message. The planned might run a simulation to evaluate various "what if" scenarios (ie. increasing available capacity, adjusting the forecast etc.). This will be covered in the chapter on Simulations. 9. Compare the three strategies for analyzing causes of late demands. Begin the comparison by trying the basic strategy--look over the late replenishment exception details. Navigate to the Planner Workbench Navigator View by = Actions Expand directory Plans Expand plan CONST-CAP Expand version (current) Expand exception group Late sales orders and forecasts Expand exception message Late replenishment for forecast Expand an organization Right click exception message Late replenishment for forecast and select Exceptions > Summary Double-click exception group Late sales orders and forecasts Double-click exception message Late replenishment for forecast Select a message (not the first one) and click Supply/Demand Navigate to the pegging region Select icon Supply Pegging Expand the pegging tree down to a department/resource of a planned order Right-click the department/resource and select Horizontal Plan From this point, you can view resource requirements and availability and drill-down for more information 10. Continue the comparison of the three strategies for analyzing causes of late demands. Try the more detailed strategy--analyze related exceptions to the late replenishment exception details. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 146
For Instructor Use Only. This document should not be distributed.
8.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 147
For Instructor Use Only. This document should not be distributed.
Navigate to the Planner Workbench Navigator View by = Actions Expand directory Plans Expand plan CONST-CAP Expand version (current) Expand exception group Late sales orders and forecasts Right click exception message Late replenishment for forecast and select Exceptions > Summary Double-click exception group Late sales orders and forecasts Double-click exception message Late replenishment for forecast Select a message (not the first one), right-click it and select Related Exceptions From this point, you can view the material, resource, and order lead time constraints and drill-down for more information 11. Finish the comparison of the three strategies for analyzing causes of late demands. Try the most detailed strategy--use the late demand diagnosis capabilities of the Critical Path Gantt Chart view. Note some of its features. For the best strategy, navigate to the Planner Workbench Navigator View by = Actions Expand directory Plans Expand plan CONST-CAP Expand version (current) Expand exception group Late sales orders and forecasts Right click exception message Late replenishment for forecast and select Exceptions > Summary Double-click exception group Late sales orders and forecasts Double-click exception message Late replenishment for forecast Select a message (not the first one), right-click it and select Gantt Chart The left pane upper display defaults to the critical path; the setting is (M) View > Critical Path Only The right pane upper display defaults to actual times; the setting is (M) View > Actual Times Only (M) View > Latest and Actual Times In the right pane upper display, the red symbols indicate the actual times--the actual start and completion times for each activity from the planning engine schedule Scroll backwards; the black symbols indicate the latest times. These times represent the latest times that activities can start and end to meet the demand due date. The planning engine calculates them backwards from the demand due date without considering resource and material constraints but considering the activity minimum durations. (M) View > Earliest and Actual Times In the right pane upper display, the red symbols indicate the actual times---the actual start and completion times for each activity from the planning engine schedule Scroll backwards; the gray symbols indicate the earliest times--the earliest schedule possible. These times represent the earliest times that activities can start. That planning engine calculates them forward from the plan start date without considering resource and material constraints but considering the activity minimum durations. If the earliest
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 148
For Instructor Use Only. This document should not be distributed.
times are greater than the latest times, not enough lead time is one of the causes for the late demand. (M) View > Constrained Earliest and Actual Times In the right pane upper display, the red symbols indicate the actual times--the planning engine schedule Scroll backwards; the pink symbols indicate the constrained earliest times--the earliest that activities can start and end considering capacity constraints Look for the material or resources with constrained earliest time before actual time; those are the root causes of the late demand For resource and material root causes, right-click the root cause in the left pane upper display and note the options. Then select Properties and review the information on the Properties window. For resource root causes, navigate to the left pane lower display and click Resources In Available Resources, multi-select the root cause resources and then click the icon single right pointing arrow; the resources move to Selected Resources. Click OK and note the right pane lower display that displays the resource profile For material root causes, navigate to the left pane lower display and click Suppliers In Available Suppliers, multi-select the root cause organizations/items/suppliers and then click the icon single right pointing arrow; the organizations/items/suppliers move to Selected Suppliers. Click OK and note the right pane lower display that displays the supplier capacity profile In both resource and supplier graphs, right-click on a period inside the graph and note the Resource Requirements by Demand Priority and Supplier Capacity Requirements by Demand Priority graphs. These graphs show all of the requirements from non-firm orders in the period that peg to end demands of equal, lower, or higher priority that the late demand that you are researching and then the firm orders in the period. 12. Respond to recommendations. (N) Supply Chain Plan > Workbench Expand directory Plans Right-click plan CONST-CAP and select Supply/Demand > Supply Select For Release or Firm for some recommendations and act on them. Make any manual edits that you want to (use the Release Properties tabbed region). Before you release, record the actions that you are about to take. After the instructor reruns the plan, you can check that your recommendations are implemented and see their effect on the plan.
For Instructor Use Only. This document should not be distributed. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 149
Practice - Working with Enforce Capacity Constraints Plans II Overview This practice covers working with enforce capacity constraints plans.
Tasks
Instance:Organization = TST:M1 1. After the instructor re-runs the plan, check the effect on the plan of your exception resolutions for item CM66321, your exception resolution for resource CHIPMOUNT1, and your implemented recommendations.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 150
For Instructor Use Only. This document should not be distributed.
Responsibility: Advanced Supply Chain Planner
Solution – Working with Enforce Capacity Constraints Plans II Responsibility: Advanced Supply Chain Planner
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1 1. After the instructor re-runs the plan, check the effect on the plan of your exception resolutions for item CM66321, your exception resolution for resource CHIPMOUNT1, and your implemented recommendations.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 151
For Instructor Use Only. This document should not be distributed.
Lesson 11 - Constrained Enforce Capacity Constraints with Decision Rules Plan
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 152
Practice - Working with Decision Rule Plans Overview This practice covers working with decision rule plans.
Tasks Responsibility: Advanced Supply Chain Planner
Make a Copy of the Decision Rules Plan 1. Navigate to the Supply Chain Plan Names form. 2. Enter the information to copy the plan. View Decision Rule Plan Options 3. View the constrained plan options. 4. Which type of plan is this? 5. Find differences between the plan options for this plan and your xxECC plan. Review Substitutes and Alternates Responsibility: Inventory Instance:Organization = TST:M1 6. View item substitutes. Responsibility: Advanced Supply Chain Planner Instance:Organization = TST:M1 7. View an alternate bill of material/routing pair for item SB66328 in organization S1. 8. View substitute and alternate exception messages.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 153
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1
Make a Copy of the Decision Rules Plan 1. From the Advanced Supply Chain Planner responsibility, Instance: Organization, TST:M1, navigate to the Supply Chain Plan Names form. (N) Supply Chain Plan > Names 2. Select Plan Name: Decision. Click (B) Copy Plan. In the Destination region of the Copy Plan (TST:M1) window, enter the information to copy the plan. − Name = XXDecision − Description = XX_Decision Rules Plan − Plan Type = Manufacturing Plan Click (B) OK. View Decision Rule Plan Options 3. View your Decision Rules plan options. (N) Supply Chain Plan > Names Select plan XXDecision. Click (B) Plan Options. 4. Which type of plan is this? ___________________________ On Plan Options (TST:M1) navigate to the Constraints tabbed region. − The Constrained Plan check box is selected. − The Enforce Capacity Constraints radio button is selected. Navigate to the Decision rules tabbed region. − The check boxes for several Decision Rules are selected. Navigate to the Optimization tabbed region. − The Optimize check box is clear. Answer: It is a constrained, enforce capacity constraints plan with decision rules. 5. Find differences between the plan options for this plan and your XX_ECC plan. Answer: The plan options are exactly the same except that this plan has decision rules selected. Review Substitutes and Alternates 6. Switch to the Inventory Responsibility, Organization M1. View item substitutes. (N) Items > Item Relationships Select organization M1 The Find Item Relationships window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 154
For Instructor Use Only. This document should not be distributed.
Solution – Working with Decision Rule Plans
Notes:
7.
Switch responsibilities to the Advanced Supply Chain Planner responsibility. In Instance: Organization TST:M1, view an alternate bill of material/routing pair for item SB66328 in organization S1. (N) Supply Chain Plan > Workbench View By = Organizations Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 155
For Instructor Use Only. This document should not be distributed.
Select Substitute from the list of values in the Type field. Click (B) Find. The Item Relationships (V1) window appears.
The alternate bill of material is named LONG TEST. Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 156
For Instructor Use Only. This document should not be distributed.
Expand the Plans directory. Expand plan XXDecision. Expand instance:organization TST:S1. Expand item category ASSEMBLY.SUBASSY. Highlight, and then right click item SB66328. From the right-click menu, select Bill of Material/Routing > Components. The Components window appears.
− The matching alternate routing is also named LONG TEST. Notes:
8.
Return to the Planner Workbench navigator. View substitute and alternate exception messages. On the Plans tab of the Planner Workbench Navigator: − View By = Actions − Expand the Plans directory. − Expand XXDecision > current > Substitutes and Alternates Used − Highlight Planned order uses alternate BOM/Routing Select the Exceptions icon.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 157
For Instructor Use Only. This document should not be distributed.
Return to the navigator. − Highlight, and then right click item SB66328. − From the right-click menu, select Bill of Material/Routing > Routing Operations. The Routing Operations (TST:M1) window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 158
For Instructor Use Only. This document should not be distributed.
The Exception Details window appears.
For Instructor Use Only. This document should not be distributed.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 159
For Instructor Use Only. This document should not be distributed.
Lesson 12 - Constrained Enforce Demand Due Dates Plans
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 160
Practice - Working with Enforce Demand Due Date Plans Overview This practice covers working with enforce demand due date plans.
Tasks Responsibility: Advanced Supply Chain Planner
Make a Copy of the EDD Plan 1. Navigate to the Supply Chain Plan Names form. 2. Select plan Const-Date. 3. Navigate to the Copy Plan form. 4. Enter the information to copy the plan in the Destination region: Work With the EDD Plan 5. Navigate to Planner Workbench Navigator. 6. In the Navigator, select the Plans tabbed region. 7. View By = Actions 8. Expand directory Plans 9. Multi-select plans XX_ECC and XX_EDD. 10. Navigate to the right-click menu and select Exceptions > Summary. Note the columns Plan and Version. 11. Look at the exception messages in exception groups Late Sales Orders and Forecasts and Material and Resource Capacity Exceptions. How might they differ by plan? 12. View Constrained - Enforce demand due dates exception message Sales order/forecast at risk. 13. View one Resource overloaded exception message.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 161
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1
Solution – Working with Enforce Demand Due Date Plans Responsibility: Advanced Supply Chain Planner
Make a Copy of the EDD Plan 1. Navigate to the Supply Chain Plan Names form. (N) Supply Chain Plan > Names 2. Select plan Const-Date. 3. Navigate to the Copy Plan form. (B) Copy Plan 4. Enter the information to copy the plan in the Destination region: Name = XX_EDD Description = Enforce demand due dates plan Plan Type = Manufacturing Plan Click OK to submit, and click OK again when prompted Work With the EDD Plan 5. Navigate to the Planner Workbench Navigator. 6. In the Navigator, select the Plans tabbed region. 7. View By = Actions 8. Expand directory Plans 9. Hold down the shift key, and multi-select plans XX_ECC and XX_EDD. 10. Navigate to the right-click menu, and then select Exceptions > Summary. The Actions window appears.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 162
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1
Note the columns Plan and Version. 11. Look at the exception messages in exception groups Late Sales Orders and Forecasts and Material and Resource Capacity Exceptions. How might they differ by plan? The EDD plan has Sales order/forecast at risk exception messages (with resource and supplier capacity overloaded, end demands are at risk of being late if you can’t resolve the constraints); the ECC plan has Late replenishment for sales order and Late replenishment for forecast exception messages (with resource and supplier capacity respected, end demand fulfillment is scheduled late). The EDD plan has Resource overloaded and Supplier capacity overloaded exception messages (by respecting demand due dates, it overloads resource and supplier capacity); the ECC plan has Resource constraint and Material constraint exception messages (the planning engine reaches the limits on the resource and supplier capacities, it begins to push out end demand due dates).
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 163
For Instructor Use Only. This document should not be distributed.
Notes:
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 164
For Instructor Use Only. This document should not be distributed.
12 View Constrained - Enforce demand due dates (Plan Name: XX_EDD) exception message Sales order/forecast at risk. (N) Supply Chain Plan > Workbench. Navigate to the Navigator. Select tab Plans. View By = Actions. Expand directory Plans. Select plan XX_EDD. Expand version Current. Expand exception group Late Sales Orders and Forecasts. Expand exception message Sales order/forecast at risk. Expand an organization. Right-click an item and click icon Exceptions. 13. View one Resource overloaded exception message. (N) Supply Chain Plan > Workbench. Navigate to the Navigator. Select tab Plans. View By = Actions. Expand directory Plans. Expand plan XX_EDD through the directories to exception message Resource overloaded, right-click it, and select Exceptions > Summary. Double-click Resource overloaded. Select an exception message (not the first one) and note its Start Constraint Date and End Constraint Date. Right-click the same exception message and select Horizontal Plan. Scroll to the constrained dates referenced in the exception message. Note the overload (Net hours available).
For Instructor Use Only. This document should not be distributed.
Lesson 13 - Cost-Based Optimized Plans
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 165
Practice - Working with Optimized Plans Overview This practice covers working with optimized plans.
Tasks Responsibility: Advanced Supply Chain Planner
Make a Copy of the Constrained Plan 1. Navigate to the Supply Chain Plan Names form. 2. View the optimized plan options. 3. Which type of plan is this? 4. Find and note the two tabbed regions that have differences in plan options between this plan and your xx_ECC plan. 5. Compare the exception messages between your enforce capacity constraints plan and your optimized plan.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 166
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1
Solution – Working with Optimized Plans Responsibility: Advanced Supply Chain Planner
Make a Copy of the Constrained Plan 1. Navigate to the Supply Chain Plan Names form. (N) Supply Chain Plan > Names Copy Plan Name Optimized as XX_Opt 2. View the optimized plan options. Select plan XX_Opt Click Plan Options 3. Which type of plan is this? Navigate to the Constraints tabbed region − Constrained Plan is selected − Enforce Capacity Constraints is selected Navigate to the Decision rules tabbed region − Decision rules are selected − Navigate to the Optimized tabbed region Optimize is selected − It is an optimized plan 4. Find and note the tabbed regions that have differences in plan options between this plan and your XX_ECC plan. In the Optimization tabbed region, this plan has optimization objectives specified 5. Compare the exception messages between your enforce capacity constraints plan and your optimized plan. Navigate to Planner Workbench Navigator. In the Navigator, select the Plans tabbed region. View By = Actions Expand directory Plans. Multi-select plans XX_ECC (not XX_EDD) and XX_Opt. Navigate to the right-click menu and select Exceptions > Summary. Note the columns Plan and Version. Browse the exception summary and find the exception messages that are prevalent in each plan type.
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 167
For Instructor Use Only. This document should not be distributed.
Instance:Organization = TST:M1
There are no Practices and Demonstrations in this Lesson
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 168
For Instructor Use Only. This document should not be distributed.
Lesson 14 - Global Forecasting
There are no Practices and Demonstrations in this Lesson
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 169
For Instructor Use Only. This document should not be distributed.
Lesson 15 - Integrating Advanced Supply Chain Planning with Other Oracle Applications
For Instructor Use Only. This document should not be distributed.
Lesson 16 – Planning Strategies
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 170
Practice - Performing Simulationss Overview This practice covers performing simulations.
Tasks
Make a copy of the Baseline Plan 1. (N) Supply Chain Plan > Names 2. In the Name field, click Const-Cap. 3. (B) Copy Plan 4. In the Destination Name field enter XXSIM. 5. In the Description field, type Simulation Plan. 6. (B) OK 7. Use the View>Requests menu to ensure that your new plan has been copied. Compare the Exception Messages 8. (N) Supply Chain Plan > Workbench 9. Expand the Plan node. 10. Using the Ctrl key, select both the Const-Cap and the XXSIM plan. 11. Right click and select Exceptions>Summary. 12. Verify that the Exception messages are the same for both plans. Make changes to your XXSIM Plan 13. (N) Supply Chain Plan > Workbench 14. Change the View By to Resources. 15. Expand the XXSIM plan to find the CHIPMOUNT1 resource (Plans>XXSIM>TST:S1>Production> SURF MOUNT>CHIPMOUNT1) 16. Highlight the CHIPMOUNT1 resource, then right click and select Resources> Resource Capacity. 17. In the Update Mode field, select the Add Capacity. 18. In the Start Date, enter today’s date. 19. In the End Date, enter a date 10 weeks from now. 20. Select Shift Number 1. 21. In the Capacity Units field, enter 1. 22. (B) Apply Run the Batch Replan 23. (M) Plan > Batch Replan 24. Use View>Requests to confirm the completion of the request. Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 171
For Instructor Use Only. This document should not be distributed.
Responsibility = Advanced Supply Chain Planner
Copyright © Oracle Corporation, 2011. All rights reserved.
R12.x Oracle Advanced Supply Chain Planning Fundamentals Chapter 1 - Page 172
For Instructor Use Only. This document should not be distributed.
Compare the Exception Messages 25. (N) Supply Chain Plan > Workbench 26. Using the Ctrl key, select both the Const-Cap and the XXSIM plan 27. Right click and select Exceptions>Summary 28. Evaluate if there are any improvements to your plan. Have the number of Late Replenishment for Forecast messages been reduced? Has there been an improvement to the number of days late? 29. Have there been impacts to any of the other exception messages?