ProTrack Training for Operations Team Venugopal R 10-Oct-11
© 2009 2008 MindTree Consulting
Agenda Training Objective
ProTrack – An Overview Fitment with OTC Cycle Project Life Cycle Authorization Matrix – Access Control
ProTrack – Highlights ProTrack – Operations Activities ProTrack – Custom Enhancements
© 2008 MindTree Consulting
Slide 2
Training Objective The Objective of this training is to provide the detailed Training on the ProTrack (cProjects 4.5) for Operations team activities.
© 2008 MindTree Consulting
Slide 3
ProTrack Fitment into OTC Cycle
© 2008 MindTree Consulting
Slide 4
Project Life Cycle Close Project Baseline metrics
PIN mPower id PROJECT PLANNING CYCLE
Monitoring & Control-> Re-planning
1. Project Level Details (Ops)
2. Project WBS Holder using template (Ops)
Project Execution
9. Baseline and Release Plan
3. Create Project and WBS in PS (Ops)
8. Run reports and verify plan
4. Create Tasks & Milestones
7. Assign tasks to people
5. Dependencies & Scheduling 6. Add Project roles & staff people (Ops) © 2008 MindTree Consulting
Slide 5
ProTrack - High Level Authorization Matrix Role
Access
Remarks
Operations
1.Project creation 2.Assign project template 3.Project Level authorization 4.Role creation, updation, deletion 5.Staffing - creation, updation,
Project mPower id is non-editable. All projects are editable by Ops. There is no hierarchy built for Ops.
Project Manager
1.Include project template 2.Task creation, updation, deletion 3.Task assignment 4.Version control 5.Reports 6.Project Level authorization 7.Create roles in simulation mode
Access mentioned here is applicable to people who are assigned as PMs for project. People having mPower PM access will get read only access to all projects. Deletion of task is possible only if time is not booked and project is not in Transfer state. PM can give access to the project to anyone.
Delivery Manager/Qcat
1.DM has read only access to all projects 2.For Qcat access has to be provided by the PM 3.Reports
Refers to delivery manager access in mPower.
OPG
1.Template creation 2.Version Management 3.Task Type and COQ management
Currently this role does not exist in mPower.
Team member
1.Read only access for the project staffed in. 2.Edit task if access is given by the PM.
Team members will not have any access for projects in which they are not staffed in.
All others
1.PM can give access to the project to anyone.
© 2008 MindTree Consulting
Slide 6
ProTrack - Highlights
Restricted Authorization control
Classification of Project Types based on Business Units BP Number is same as Employee ID No Project End Date Maintenance Do not release the ProTrack Project OPS to Create PS Project, Maintain Start Date and End Date, Release PS Project Billing Template in PS is limited to milestones without any Life Cycle activities Manual Linking of ProTrack Project with PS Project
PM will release the ProTrack project for Time Sheet Entry Project Resources have tight Integration with Time Sheet
© 2008 MindTree Consulting
Slide 7
ProTrack in OTC cycle ProTrack– New UI ORDER
New Role Request
Staffing Extension/Rel
PM
PM
PIN
Project Creation
GME
GME Approval
Staffing
DH/IGH
OPS
PM
DM
OPS
SO Creation
Billing Template
Sales Support
OPS
CASH TBR
Task Planning
Sales Support
PM
Invoice Generation
Milestone Confirmation
Timesheet Entry
Finance D2-3
System D2
Team Member Timesheet Transfer
System driven
Process driven Potential bottleneck
GMA
PM © 2008 MindTree Consulting
System
Timesheet Approval
PM Slide 8
ProTrack in OTC cycle contd….
ORDER
New Role Request
Staffing Extension/Rel
PM
PM
PIN
Project Creation
GME
GME Approval
Staffing
DH/IGH
OPS
PM
DM
OPS
SO Creation
Billing Template
Sales Support
OPS
CASH TBR
Task Planning
Sales Support
PM
Invoice Generation
Milestone Confirmation
Timesheet Entry
Finance D2-3
System D2
Team Member Timesheet Transfer
System driven
Process driven Potential bottleneck
GMA
PM © 2008 MindTree Consulting
System
Timesheet Approval
PM Slide 9
ProTrack – OPS Activities ProTrack – cProjects 4.5 Project Creation
Select the Project Type Copy Project Template
Maintain start date of the project Maintain Service Offerings Authorize/Assign Project Manager
Project Role Creation
Select the Project Role Type Maintain the start date and end date for project role Maintain Allocation %
Project Role Staffing
Assign Mind to Project Role
Check the start date and end date with capacity allocation
Project System – ECC Create PS Project, Project Start and End Date Maintenance, Release PS Project Maintain Billing Template for TnM, FPC and FMC Projects. Manual Linking of ProTrack Project with PS Project Execute ZROLES for ProTrack Project Roles and Staffing Synch with ECC © 2008 MindTree Consulting
Slide 10
ProTrack Demo
ProTrack Demonstration
© 2008 MindTree Consulting
Slide 11
ProTrack Demo
Step 1: Create ProTrack Project
© 2008 MindTree Consulting
Slide 12
Step 1: Project Creation
1
2
3
For Service Offerings, Reference is PIN Details
DO NOT CHANGE THE STATUS © 2008 MindTree Consulting
Slide 13
ProTrack Demo
Step 2: Create PS Project
© 2008 MindTree Consulting
Slide 14
Step 2: Create PS Project in ECC System 1 PS Project ID and NAME = ProTrack Project ID and NAME
2
Transaction Code – CJ20N
3
© 2008 MindTree Consulting
CHECKLIST: • PS Project ID = ProTrack Project ID • PS Project Name = ProTrack Project Name • Project Profile = CPR0001 • Project Structure Contains – Project Definition and Project Root WBS (Both Should Have the Same ID and Name ) • Add Billing Template (TnM, FPC, FMC)
Slide 15
Step 3: Release PS Project
© 2008 MindTree Consulting
Slide 16
Step 3: Release the PS Project
Select the Project Definition -> Then Click on EDIT MENU > STATUS -> RELEASE Save The Project After Release
© 2008 MindTree Consulting
Slide 17
Step 4: Manual Linking Of ProTrack Project with PS Project
© 2008 MindTree Consulting
Slide 18
Step 4: Link the ProTrack Project with PS Project (1)
1
STEP 1: Change the Status “SET TO ASSIGN”
STEP 2: Click on the “ACCOUNTING” TAB
2
STEP 3: Click on “ACCOUNT ASSIGNMENT” BUTTON
3 © 2008 MindTree Consulting
Slide 19
Step 4: Link the ProTrack Project with PS Project (2)
2
STEP 1: Change the Status “SET TO ASSIGN” STEP 2: Click on the “ACCOUNTING” TAB STEP 3: Click on “ACCOUNT ASSIGNMENT” BUTTON
3
© 2008 MindTree Consulting
Slide 20
Step 4: Link the ProTrack Project with PS Project (3)
1
2
ProTrack Project ID = PS Project ID
STEP 1: Select the ProTrack Project.
3
STEP 2: Select the PS Project STEP 3: Click on “ASSIGN” BUTTON
© 2008 MindTree Consulting
Slide 21
Step 4: Link the ProTrack Project with PS Project (4)
CHECKLIST BEFORE SAVE: • •
PS Project ID = ProTrack Project ID PS Project Name = ProTrack Project Name
© 2008 MindTree Consulting
Slide 22
Step 5: Maintain the PS Project Start & End Dates
© 2008 MindTree Consulting
Slide 23
Step 6: Maintain the Start date and End Date of the PS Project
© 2008 MindTree Consulting
Slide 24
Step 6: Maintain Billing Templates for PS Project
© 2008 MindTree Consulting
Slide 25
Step 7: Maintain the billing templates in PS Project (1)
© 2008 MindTree Consulting
Slide 26
Step 7: Maintain the billing templates in PS Project (2)
© 2008 MindTree Consulting
Slide 27
Step 7: Maintain the billing templates in PS Project (3)
© 2008 MindTree Consulting
Slide 28
Step 7: Maintain the billing templates in PS Project (4)
© 2008 MindTree Consulting
Slide 29
Step 7: Maintain the billing templates in PS Project (5)
© 2008 MindTree Consulting
Slide 30
Step 7: Assign Authorization
© 2008 MindTree Consulting
Slide 31
Assign Authorization to Project Manager Without Staffing
Step 1
Step 2
© 2008 MindTree Consulting
Slide 32
Step 8: Create Project Role
© 2008 MindTree Consulting
Slide 33
Project Role Creation
Step 1
In Step 2, Maintain the mandatory fields • Project Role Type • Start Date, Finish Date • Allocation %
Step 2
© 2008 MindTree Consulting
Slide 34
Step 9: Create Project Role Staffing
© 2008 MindTree Consulting
Slide 35
Project Role Staffing
• BP Number is same as Employee ID • After Staffing, verify the following • Start Date, End Date, Required Capacity • Any Changes to the Project Role, Recheck the Staffing Details and if required redo the staffing with updated details.
© 2008 MindTree Consulting
Slide 36
Step 10: Run ZROLES
© 2008 MindTree Consulting
Slide 37
Run ZROLES for Staffing Synch - 1
Transaction Code – ZROLES Input – Project ID
© 2008 MindTree Consulting
Slide 38
Run ZROLES for Staffing Synch - 2
Save the ZROLES data.
© 2008 MindTree Consulting
Slide 39
ProTrack – Custom Enhancements Role based Filtering on staffing dates.
Filter on completed and not completed tasks in Task Assignment tab Show only non completed/cancelled task in the Task assignment. Filter on Active and Inactive role in Resource assignment tab
Show only the Active roles in the Resource assignment tab. Including the WBS/tasks from the existing Projects Move cancelled tasks to “Cancelled Task History”
© 2008 MindTree Consulting
Slide 40
© 2008 MindTree Consulting
Slide 41
Imagination Action Joy