Prosedur Cci

  • Uploaded by: azmir
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Prosedur Cci as PDF for free.

More details

  • Words: 4,816
  • Pages: 61
Cadastral Control Infrastructure

Applikasi GPS

Prosidur Cerapan dan Pemprosesan Bagi Cadastral Control Infrastructure (CCI) Seksyen Geodesi, Bahagian Pemetaan JUPEM Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Ringkasan 1.

2. 3.

4.

Sistem dan Perkhidmatan MyRTKnet  Konsep  Jaringan MyRTKnet  Perkhidmatan MyRTKnet Keperluan-keperluan asas Prosidur  Kalibrasi Alatan GPS  Prosidur Lapangan dan Pejabat  Cerapan dan Muat Turun Data Virtual RINEX  Pemprosesan Data  Analisis  Perbandingan Koordinat  Transformasi Koordinat Serahan Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

MyRTKnet – 





Konsep [1 of 4]

Penggunaan network sebagai stesen-stesen rujukan berbanding single reference station membolehkan selsisih sistematik dimodelkan untuk menghapuskan selisih dalam pengukuran. Menambah jarak antara rover dengan stesen rujukan. Mengurangkan tempoh initialization. Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

MyRTKnet –



Konsep [2 of 4]

Dalam Sistem MyRTKnet, Pembetulan akan dihantar kepada rover melalui kaedah berikut: Virtual Reference station (VRS) VRS memerlukan komunikasi dua hala antara rover dan pusat kawalan di Ibu Pejabat JUPEM. Pembetulan akan dihantar dalam bentuk fromat RTCM dan CMR yang mana ianya boleh diterima oleh semua jenis jenama alatan GPS. Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

MyRTKnet – 





Konsep [3 of 4]

Konsep “Virtual Reference Station” adalah dengan memperolehi network daripada stesen rujukan RTK yang dihubungkan ke pusat kawalan bagi menghantar setiap saat data melalui talian khas yang dipanggil lease line. Server di Pusat Kawalan secara berterusan mengumpul data daripada 78 receivers di seluruh malaysia dan mewujudkan pangkalaan data bagi menghasilkan pembetulan. Pangkalan data ini digunakan bagi mewujudkan Virtual Reference Station, yang terletak beberapa meter daripada kedudukan rover. Daripada stesen VRS yang diwujudkan ini pembetulan akan dilakukan dan dihantar kepada Kursus Intensif Jurukur) rover melalui NTRIP.29 February 2007

Konsep [4 of 4]

Cadastral Control Infrastructure

MyRTKnet –

Kursus Intensif Jurukur) 29 February 2007

MyRTKnet – Cadastral Control Infrastructure

Jaringan MyRTKnet [1 of 5]

Dua Fasa Pembangunan MyRTKnet di Malaysia. Fasa 1  Jaringan terdiri daripada 25 dual frequency reference stations di Semenanjung Malaysia.  Dibangunkan pada tahun 2004  Tambahan 2 reference stations di Malaysia Timur  Pusat Kawalan di Seksyen Geodesi, JUPEM  Hanya tiga kawasan yang mempunyai liputan VRS iaitu Lembah Klang, Pulau Pinang dan Johor Baharu. Kursus Intensif Jurukur) 29 February 2007

Jaringan MyRTKnet [2 of 5]

ARAU

6 .5 0

G ETI

UUM K LGKW

6 .0 0 RTPJ

U S M SP G

5 .5 0

PT

KUAL G R IK

BKPL BABH

5 .0 0

SELM M ARG G M US

IP O H 4 .5 0

L a titu d e

Cadastral Control Infrastructure

MyRTKnet –

J U IP

PUPK

4 .0 0

KUAN

BEHR

3 .5 0

KKBH

PEKN

TLOH

KTPK M ERU

3 .0 0

UPM S

KLAW

BANT

SEG A

2 .5 0

M ERS

M A S S S ta tio n s

JUM L

2 .0 0

KLUG

UTM J

M y R T K n e t S t a t io n s

1 .5 0

JH JY KUKP

9 9 .5 0

1 0 0 .0 0

1 0 0 .5 0

1 0 1 .0 0

1 0 1 .5 0

1 0 2 .0 0

1 0 2 .5 0

1 0 3 .0 0

L o n g itu d e

Kursus Intensif Jurukur) 29 February 2007

1 0 3 .5 0

TG PG

1 0 4 .0 0

1 0 4 .5 0

1 0 5 .0 0

Cadastral Control Infrastructure

MyRTKnet – Fasa 2 









Jaringan MyRTKnet [3 of 5]

Jaringan daripada 50 dual frequency reference stations di Semenanjung Malaysia: Jaringan daripada 28 dual frequency reference stations di Malaysia Timur (Sabah dan Sarawak) Projek bermula pada 2006, dan telah siap pada Mei 2007 di Semenanjung Malaysia 14 Stesen dalam pembinaan di Sabah dan Sarawak 95% Semenanjung Malaysia mempunyai Kursus Intensif Jurukur) 29 February 2007

MyRTKnet –

Jaringan MyRTKnet [4 of 5]

A R AU

6 .5 0

U UM K LG K W G ETI

6 .0 0 K TSS

S IK 1 P AS P K KR A I

A YR L SGP T U S MP

5 .5 0

S E TI

K U AL

G R IK T ER I

B AB H

5 .0 0

B KTB

LAS A G MU S BA TU

4 .5 0

L a t it u d e

Cadastral Control Infrastructure

7 .0 0

C AM E P UP K

4 .0 0

L IP I T LK I

C E NH

JR N T

B EH R S R IJ

3 .5 0

BE N T

SB KB

P E KN

TLOH

M ER U

M U AD

K LA W

3 .0 0 UP M S BA N T

2 .5 0

B AH A

SE G A

K ROM

P D IC

ME R S G P58 JUML

2 .0 0

TG R H

P R TS SP G R

1 .5 0

9 9 .0 0

K U KP

9 9 .5 0

1 0 0 .0 0

1 0 0 .5 0

1 0 1 .0 0

1 0 1 .5 0

1 0 2 .0 0

1 0 2 .5 0

1 0 3 .0 0

L o n g itu d e

Kursus Intensif Jurukur) 29 February 2007

1 0 3 .5 0

J H JY

T GPG

1 0 4 .0 0

1 0 4 .5 0

1 0 5 .0 0

MyRTKnet –

KU DA

7

KBE L UM SS 6

LAB1

JA M B

R ANA

SAN D

BEAU

KEN I TEN O

LAH A

L IM B L A W A

5

L a titu d e ( N )

Cadastral Control Infrastructure

Jaringan MyRTKnet [5 of 5]

TU NK

SEM P

M IR I

LSEM

TA W A

M AR U 4

M UKA

3

S IB U 2

B IN T BELA

KAPI

SEM A UM AS AM AN TEBE

1

1 10

11 1

112

113

1 14

11 5

Kursus Intensif Jurukur) L o n g it u d e ( E ) 29 February 2007

116

117

118

1 19

MyRTKnet – Perkhidmatan [1 Cadastral Control Infrastructure

of 1]



Perkhidmatan MyRTKnet  Network-Base RTK  Single-Base RTK  Network-Base DGPS  Virtual Rinex



Ketepatan  Network-Base RTK : ± 2 - 3 cm (up to 20 km outside net)  Single-Base RTK : ± 2 - 3 cm (30 km radius)  Network-Base DGPS : ± 20 - 50 cm (up to 150 km outside Kursus net) Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure









Keperluan Asas Pengukuran - [1 of 2]

GPS Receiver dengan Firmware dan controller yang boleh menerima pembetulan VRS RTK . Data Logger yang boleh menampung Windows CE dan PPP connections to ISPs or to GPRS Mobile Phone dengan GSM Data / GPRS services Melanggan perkhidmatan MyRTKnet dengan JUPEM Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Keperluan Asas Pengukuran - [2 of 2]

Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Prosidur 2. 3.

Kalibrasi Alat Prosidur Lapangan dan Pejabat    

Cerapan & Virtual Data Download Pemprosesan Data Data Analisis Perbandingan Koordinat

Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Prosidur – 





Kalibrasi Alat GPS [1 of 6]

Mematuhi Pekeliling Ketua Pengarah Ukur dan Pemetaan (KPUP) No. 6/1999, No. 9/2005 dan No. 1/2008 Kerja-kerja kalibrasi alat GPS adalah bertujuan untuk memastikan alat berada dalam keadaan baik bagi memastikan koordinat yang diperolehi mempunyai ketepatan yang tinggi. Ujian yang dilakukan akan dapat mengenalpasti ketepatan pengukuran sesebuah receiver disamping untuk menilai perisian pemprosesan yang dibekalkan. Tatacara Ujian Alat GPS bagi tujuan pengukuran menggunakan GPS terdapat dalam Pekeliling Ketua Pengarah Ukur dan Pemetaan (KPUP) No. 6/1999 dan No. 1/2008. Perkara yang perlu Kursus Intensif Jurukur)ujian Alat GPS dipenuhi bagi menjalankan 29 February 2007 dengan menggunakan MyRTKnet adalah seperti

Cadastral Control Infrastructure

Prosidur –

Kalibrasi Alat GPS [2 of 6]



Ujian perlu dijalankan sebelum sesuatu kerja GPS yang menggunakan perkhidmatan MyRTKnet dilakukan.



UJian boleh dilakukan di JUPEM’s GPS/EDM Test Base atau Primary GPS Network stations dalam liputan VRS MyRTKnet.



Ujian dilakukan dengan menghubungkan mobile receiver kepada data cell phone and data collector (seperti yang disarankan oleh pengeluar alat GPS).



Kursus Intensif Jurukur) belas darjah (15°) Cut-off angle adalah lima 29 February 2007

Cadastral Control Infrastructure

Prosidur –

Kalibrasi Alat GPS [3Startof 6]

Real-Time VRS Observation

Calibration Technique ?

Data Processing

Post-Processed VRS Observation

Data Processing No

Repeatability Analyses & Comparison

Acceptance? Yes Data & Results Submission to JUPEM for Certification End Kursus Intensif Jurukur) 29 February 2007

Baseline Solution Analyses & Comparison

Cadastral Control Infrastructure

Prosidur –

Kalibrasi Alat GPS [4 of 6] Real Time VRS Syarat Kalibrasi menggunakan 1.

Cerapan lima (5) saat bagi 10 kali bacaan untuk tiga (3) epoch.

2. Sekurang-kurang menjejak lima (5) satellites dengan GDOP kurang daripada enam (6). 3. Cerapan perlu dilakukan sekurang-kurang diatas tiga (3) pillar/Stesen GPS. 4. Perbezaan maksimum yang dibenarkan adalah 30 mm bagi komponen horizontal dan 60 mm Intensif Jurukur) bagi komponen Kursus vertical. 29 February 2007

Prosidur – Cadastral Control Infrastructure

Kalibrasi Alat GPS [5 of 6]

Cerapan Statik dengan VRS Rinex (Post-Processed) • Cerapan statik dengan cerapan satu (1) saat bagi 2 sesi cerapan selama 5 minit satu sesi. • Menjejak sekurang-kurangnya lima (5) satellite dengan GDOP kurang daripada enam (6). • Cerapan perlu dilakukan sekurang-kurangya diatas tiga (3) pillar. • Mnghasilkan Data VRS Rinex dengan menggunakan koordinat yang tidak lebih daripada 30 m dengan observation interval dan sessions length seperti di Para. [1.]. • Perbezaan maksimum yang dibenarkan adalah Kursus Intensif Jurukur) 30 mm bagi komponen horizontal dan 60 mm 29 February 2007

Cadastral Control Infrastructure

Prosidur –

Kalibrasi Alat GPS [6 of 6]

Serahan data hasil cerapan untuk pengesahan •

• •

• • •

Data cerapan real time (DC file) dalam ASCII format untuk setiap initialisation Raw data bagi cerapan real time. Data RINEX dan Data VRS Rinex untuk kaedah post-processed Baselines solution bagi post processed Senarai Koordinat akhir. Perbandingan Koordinat. Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Prosidur –



Lapangan dan Pejabat Prosidur Lapangan dan Pejabat     

Start

Cerapan di Lapangan Muat turun Data Cerapan dan VRINEX Pemprosesan Data Data Analisis Real-Time Perbandingan Koordinat Survey Observation Technique ?

Static Obs. + Virtual Rinex

Kursus Intensif Jurukur) 29 February 2007

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [1 of 11]

Equipment Preparation

Start

Real-Time Data Processing Epoch No. 01 Repeatability Analyses

Epoch No. 02 Repeatability Analyses

Average Coordinates

Average Coordinates

Comparison? OK

Multi-epochs Average Coordinates

Virtual Rinex Data Download

Data Download 2. Real-Time Data 3. Rinex Data

NO NO

Field Observation Real-Time Login [Two Initializations]

Observation Configuration

Comparison?

Epoch No. 01 Post-Process Kinematic

Epoch No. 02 Post-Process

Baseline Solution & Coordinates Analyses

Baseline Solution & Coordinates Analyses

Kinematic

OK

Data & Results Submission

Multi-epochs Average Coordinates

End Kursus Intensif Jurukur) 29 February 2007

OK

Comparison? NO

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [2 of 11]

Penyediaan Peralatan (Check List) 1. 2. 3. 4. 5. 6.

Rover Receiver Data logger + Communications Devices Reconnaisance Survey Report Tripod or Fixed Height/Telescopic Bipod Field Form Lain-lain bahan yang berkaitan

Kursus Intensif Jurukur) 29 February 2007

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [3 of 11]

Observation Configuration

GPS Receiver/Data Logger    

1 second recording interval Minimum satellites = 5 PDOP < 6 Recording Average = 5 epochs (5 second)

Kursus Intensif Jurukur) 29 February 2007

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :Real-Time [4 of 11]

Field Observation [1 of 2] 1.

Isi Field Form 1. Nombor stesen/Code 2. Ketinggian Antenna 3. Masa Mula Cerapan

2. Connect ke Internet - GPRS or Dial-Up 3. Log into MyRTKnet System 4. Mula 1st Initialization  < 1 minutes 1. PDOP < 6 2. Number of Sats. > 5 3. 30% of GSM/GPRS receptions Kursus Intensif Jurukur) 29 February 2007

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [5 of 11]

Field Observation [2 of 2] 1.

Mula Pengukuran  10 Bacaan bagi setiap initialization



Disconnect daripada sistem MyRTKnet



Mula 2nd Initialization

6.

Mula Pengukuran  10 Bacaan bagi setipa initialization

7.

Kemaskini Field Form 1. Masa Berhenti Kursus Intensif Jurukur) 29 February 2007

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [6 of 11]

Data Download 1. 2.

3.

4. 5.

Connect Data Logger dan Receiver to PC Menggunakan software yang diberikan oleh pengeluar alat untuk muat turun data berikut: Real-Time data daripada Data Logger  GPS raw data daripada Receiver alat. Namakan data files mengikut nama-nama STATION atau apa-apa nama yang difikirkan sesuai. Convert GPS raw data kepada Rinex format Backup data sets:1. Real-Time Data 2. Raw Data in manufacturer proprietary Kursus Intensif Jurukur) 29 February 2007 format

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [7 of 11]

Real-Time Data Processing:

Pilihan 01 • Using manufacturer‘s GPS processing software, import real-time data sets from two initializations • Export the coordinates sets to common files format, preferable: Microsoft Excel • Carry out Coordinate‘s repeatability analyses Pilihan 02 • Using customized software, import real-time data sets from two initializations • Carry out Coordinate‘s repeatability analyses Kursus Intensif Jurukur) 29 February 2007

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime[8 of 11]

Station Name

W0138 - Init 01

Network

Klang Valley Dense Network

Epoch

Latitude (N)

Longitude (E)

Ellipsoidal Hgt (m)

°





v (m)

°





v (m)

Obs.

v (m)

1

3

12

26.49376

0.0021

101

39

12.81005

-0.0024

44.556

0.0053

2

3

12

26.49378

0.0028

101

39

12.81006

-0.0021

44.556

0.0053

3

3

12

26.49375

0.0018

101

39

12.80992

-0.0063

44.554

0.0033

4

3

12

26.49370

0.0002

101

39

12.80996

-0.0052

44.552

0.0013

5

3

12

26.49358

-0.0033

101

39

12.81021

0.0022

44.553

0.0023

6

3

12

26.49365

-0.0013

101

39

12.81037

0.0070

44.556

0.0053

7

3

12

26.49363

-0.0016

101

39

12.81013

-0.0001

44.544

-0.0067

8

3

12

26.49365

-0.0012

101

39

12.81011

-0.0008

44.544

-0.0067

9

3

12

26.49368

-0.0002

101

39

12.81023

0.0030

44.550

-0.0007

10

3

12

26.49371

0.0007

101

39

12.81029

0.0046

44.542

-0.0087

Mean

3

12

26.49369

101

39

12.81013

44.551

Min

3

12

26.49358

101

39

12.80992

44.542

Max

3

12

26.49378

101

39

12.81037

44.556

RMS of Obs (m)

0.002

0.004 Kursus Intensif Jurukur) 29 February 2007

0.005

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [9 of 11]

Station Name

W0138 - Init 02

Network

Klang Valley Dense Network

Epoch

Latitude (N)

Longitude (E)

Ellipsoidal Hgt (m)

°





v (m)

°





v (m)

Obs.

v (m)

1

3

12

26.49365

0.0018

101

39

12.81050

0.0035

44.550

0.0054

2

3

12

26.49368

0.0028

101

39

12.81051

0.0036

44.554

0.0094

3

3

12

26.49359

0.0001

101

39

12.81036

-0.0008

44.550

0.0054

4

3

12

26.49358

-0.0002

101

39

12.81034

-0.0015

44.545

0.0004

5

3

12

26.49358

-0.0002

101

39

12.81034

-0.0015

44.540

-0.0046

6

3

12

26.49360

0.0005

101

39

12.81031

-0.0024

44.545

0.0004

7

3

12

26.49354

-0.0012

101

39

12.81036

-0.0008

44.539

-0.0056

8

3

12

26.49358

-0.0003

101

39

12.81040

0.0003

44.542

-0.0026

9

3

12

26.49353

-0.0017

101

39

12.81040

0.0004

44.541

-0.0036

10

3

12

26.49353

-0.0017

101

39

12.81036

-0.0009

44.540

-0.0046

Mean

3

12

26.49359

101

39

12.81039

44.545

Min

3

12

26.49353

101

39

12.81031

44.539

Max

3

12

26.49368

101

39

12.81051

44.554

RMS of Obs (m)

0.001

0.002 Kursus Intensif Jurukur) 29 February 2007

0.005

Prosidur –

Lapangan & Pejabat :Real-

Cadastral Control Infrastructure

Time [10 of 11]

Jumlah Cerapan : Bil. 001 002 003 004 005 006 007 008 009 010 RMS (m)

01 01 01 01 01 01 01 01 01 01

10

Latitud 49 39.30513 49 39.30513 49 39.30506 49 39.30502 49 39.30507 49 39.30522 49 39.30525 49 39.30514 49 39.30519 49 39.30523 0.0001

103 103 103 103 103 103 103 103 103 103

Longitud 18 35.42678 18 35.42663 18 35.42656 18 35.42664 18 35.42644 18 35.42673 18 35.42659 18 35.42663 18 35.42661 18 35.42643 0.0001

Latitud Purata Longitud Purata Ketinggian Purata

: 1 49 39.30514 : 103 18 35.42660 : 27.8736

Latitud Minimum Latitud Maksimum

: :

Longitud Minimum Longitud Maksimum

: 103 18 35.42643 : 103 18 35.42678

Ketinggian Minimum : Ketinggian Maksimum :

T/Ellip(m) 27.8821 27.8833 27.8830 27.8784 27.8799 27.8698 27.8659 27.8669 27.8591 27.8677 0.0082

1 49 39.30502 1 49 39.30525

27.8591 27.8833 Kursus Intensif Jurukur) 29 February 2007

v-Lat(m) 0.0000 0.0000 -0.0001 -0.0001 -0.0001 0.0001 0.0001 0.0000 0.0000 0.0001

v-Lon(m) v-Ting(m) 0.0002 0.0085 0.0000 0.0097 0.0000 0.0094 0.0000 0.0048 -0.0002 0.0063 0.0001 -0.0038 0.0000 -0.0077 0.0000 -0.0067 0.0000 -0.0145 -0.0002 -0.0059

Prosidur – Cadastral Control Infrastructure

Lapangan & Pejabat :RealTime [11 of 11]

Real-Time – Coordinates Comparison: EPOCH No. 01

3

12

26.49369

101

39

12.81013

44.551

EPOCH No. 02

3

12

26.49359

101

39

12.81039

44.545

Coordinates Difference

0.00010” (0.0030 m)

-0.00026” (-0.0078 m)

0.006 m

Acceptance Criteria

< 20 mm

< 20 mm

< 60 mm

Multi-Epochs Average

3

12

26.49364

Kursus Intensif Jurukur) 29 February 2007

101

39

12.81026

44.548

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin. [1 of 12]

Post-Process with Virtual Rinex Data: Objektif • Pengesahan Koordinat • Legal Traceability Aliran Kerja • Log ke dalam Server MyRTKnet • Hasilkan 1“ Virtual Rinex Data berdasarkan approximate coordinates dan tempoh cerapan yang diperolehi daripada field form. • Menggunakan manufacturer‘s GPS processing software, import kedua-dua set data (Observed + Virtual Rinex). • Lakukan Post-Process Kinematic dengan Virtual Station sebagai STESEN RUJUKAN. Kursus Intensif Jurukur) 29 February 2007

Lapangan & Pejabat :Post-Processed Kin. [2 of 12]

Cadastral Control Infrastructure

Prosidur –

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[3 of 12]

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[4 of 12]

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[5 of 12]

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[6 of 12]

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[7 of 12]

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin. 8 of 12] Baseline Length

Solution Type

Ratio

Reference Variance

RMS

w0138c1vrklvl01

29.752m

L1 fixed

186.5

7.504

0.010m

Virtual_510

w0138c1vrklvl02

29.751m

L1 fixed

186.5

8.019

0.010m

B20

Virtual_510

w0138c1vrklvl03

29.750m

L1 fixed

186.5

8.786

0.010m

B21

Virtual_510

w0138c1vrklvl04

29.752m

L1 fixed

186.5

8.318

0.010m

B22

Virtual_510

w0138c1vrklvl05

29.754m

L1 fixed

186.5

6.257

0.008m

B23

Virtual_510

w0138c1vrklvl06

29.755m

L1 fixed

186.5

6.915

0.009m

B24

Virtual_510

w0138c1vrklvl07

29.754m

L1 fixed

186.5

6.102

0.008m

B25

Virtual_510

w0138c1vrklvl08

29.755m

L1 fixed

186.5

6.719

0.009m

B26

Virtual_510

w0138c1vrklvl09

29.757m

L1 fixed

186.5

4.798

0.008m

B27

Virtual_510

w0138c1vrklvl10

29.759m

L1 fixed

186.5

6.967

0.009m

B28

Virtual_510

w0138c2vrklvl11

29.760m

L1 fixed

186.5

4.390

0.008m

B29

Virtual_510

w0138c2vrklvl12

29.758m

L1 fixed

186.5

5.062

0.008m

B30

Virtual_510

w0138c2vrklvl13

29.756m

L1 fixed

186.5

4.839

0.008m

B31

Virtual_510

w0138c2vrklvl14

29.757m

L1 fixed

186.5

5.346

0.008m

B32

Virtual_510

w0138c2vrklvl15

29.754m

L1 fixed

186.5

6.323

0.009m

B33

Virtual_510

w0138c2vrklvl16

29.754m

L1 fixed

186.5

4.894

0.007m

B34

Virtual_510

w0138c2vrklvl17

29.756m

L1 fixed

186.5

4.975

0.008m

ID

From

To

B18

Virtual_510

B19

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin. [9 of 12]

ID

From

To

Baseline Length

Solution Type

Ratio

Reference Variance

RMS

B45

Virtual_511

w0124c2vrklvl11

43.644m

L1 fixed

1.8

44.416

0.021m

B44

Virtual_511

w0124c1vrklvl10

44.182m

L1 fixed

8.0

4014.840

0.220m

B43

Virtual_511

w0124c1vrklvl09

44.217m

L1 fixed

8.0

4238.133

0.226m

B42

Virtual_511

w0124c1vrklvl08

44.236m

L1 fixed

8.0

4634.481

0.236m

B41

Virtual_511

w0124c1vrklvl07

44.265m

L1 fixed

8.0

5248.506

0.245m

B40

Virtual_511

w0124c1vrklvl06

44.295m

L1 fixed

8.0

5316.994

0.252m

B39

Virtual_511

w0124c1vrklvl05

44.319m

L1 fixed

8.0

5744.657

0.264m

B38

Virtual_511

w0124c1vrklvl04

44.345m

L1 fixed

8.0

6291.366

0.271m

B37

Virtual_511

w0124c1vrklvl03

44.366m

L1 fixed

8.0

6328.713

0.276m

B36

Virtual_511

w0124c1vrklvl02

44.388m

L1 fixed

8.0

6939.540

0.280m

B35

Virtual_511

w0124c1vrklvl01

44.424m

L1 fixed

8.0

7116.175

0.288m

Kursus Intensif Jurukur) 29 February 2007

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[10 of 12]

Station Name

W0138 – Epoch 01

Network

Klang Valley Dense Network

Epoch

Latitude (N)

Longitude (E)

Ellipsoidal Hgt (m)

°





v (m)

°





v (m)

Obs.

v (m)

1

3

12

26.49366

0.0017

101

39

12.81017

-0.0019

44.558

0.0044

2

3

12

26.49367

0.0022

101

39

12.81010

-0.0042

44.555

0.0014

3

3

12

26.49363

0.0010

101

39

12.81009

-0.0043

44.557

0.0034

4

3

12

26.49358

-0.0006

101

39

12.81018

-0.0017

44.555

0.0014

5

3

12

26.49354

-0.0018

101

39

12.81028

0.0014

44.554

0.0004

6

3

12

26.49356

-0.0012

101

39

12.81028

0.0013

44.551

-0.0026

7

3

12

26.49358

-0.0006

101

39

12.81024

0.0000

44.551

-0.0026

8

3

12

26.49359

-0.0004

101

39

12.81028

0.0014

44.552

-0.0016

9

3

12

26.49361

0.0004

101

39

12.81032

0.0025

44.552

-0.0016

10

3

12

26.49358

-0.0007

101

39

12.81042

0.0056

44.551

-0.0026

Mean

3

12

26.49360

101

39

12.81024

44.554

Min

3

12

26.49354

101

39

12.81009

44.551

Max

3

12

26.49367

101

39

12.81042

44.558

RMS of Obs (m)

0.001

0.003

Kursus Intensif Jurukur) 29 February 2007

0.002

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[11 of 12]

Station Name

W0138 - Epoch 02

Network

Klang Valley Dense Network

Epoch

Latitude (N)

Longitude (E)

Ellipsoidal Hgt (m)

°





v (m)

°





v (m)

Obs.

v (m)

1

3

12

26.49347

-0.0002

101

39

12.81052

0.0061

44.549

0.0065

2

3

12

26.49347

-0.0003

101

39

12.81044

0.0038

44.550

0.0075

3

3

12

26.49344

-0.0010

101

39

12.81034

0.0007

44.547

0.0045

4

3

12

26.49348

0.0002

101

39

12.81032

0.0002

44.541

-0.0015

5

3

12

26.49347

-0.0002

101

39

12.81020

-0.0033

44.537

-0.0055

6

3

12

26.49349

0.0004

101

39

12.81020

-0.0033

44.539

-0.0035

7

3

12

26.49348

0.0001

101

39

12.81025

-0.0019

44.534

-0.0085

8

3

12

26.49349

0.0005

101

39

12.81022

-0.0028

44.546

0.0035

9

3

12

26.49347

-0.0002

101

39

12.81023

-0.0025

44.542

-0.0005

10

3

12

26.49350

0.0007

101

39

12.81041

0.0030

44.540

-0.0025

Mean

3

12

26.49348

101

39

12.81031

44.543

Min

3

12

26.49344

101

39

12.81020

44.534

Max

3

12

26.49350

101

39

12.81052

44.550

RMS of Obs (m)

0.000

0.003

Kursus Intensif Jurukur) 29 February 2007

0.005

Prosidur –

Lapangan & Pejabat :Post-

Cadastral Control Infrastructure

Processed Kin.[12 of 12]

Post-Processed – Coordinates Comparison: EPOCH No. 01

3

12

26.49360

101

39

12.81024

44.554

EPOCH No. 02

3

12

26.49348

101

39

12.81031

44.543

Coordinates Difference

0.00012” (0.0036 m)

-0.00007” (-0.0021 m)

0.011 m

Acceptance Criteria

< 20 mm

< 20 mm

< 60 mm

Multi-Epochs Average

3

12

26.49354

Kursus Intensif Jurukur) 29 February 2007

101

39

12.81028

44.549

Prosidur - Lapangan & Pejabat Cadastral Control Infrastructure

:Perbandingan Real-Time vs Post-Processed Coordinates Comparison: REAL-TIME SURVEY

3

12

26.49364

101

39

12.81026

44.548

POST-PROCESSED

3

12

26.49354

101

39

12.81028

44.549

Coordinates Difference

0.0001” (0.0030 m)

-0.00002” (-0.0006 m)

-0.001 m

Acceptance Criteria

< 20 mm

< 20 mm

< 60 mm

Multi-Epochs Average

3

12

26.49354

Kursus Intensif Jurukur) 29 February 2007

101

39

12.81028

44.549

Cadastral Control Infrastructure

Procedures



Lapangan&pejabat : Static + Virtual Rinex [1 of 11]

Equipment Preparation

Start

Observation Configuration

Baseline Processing Two (2) Epochs

Epoch No. 01 Baseline Solution & Coordinates Analyses

NO

Rinex Data Download

Epoch No. 02 Baseline Solution & Coordinates Analyses

Comparison?

Field Observation Static Technique [Two Sessions]

OK

Data & Results Submission

Kursus Intensif Jurukur) 29 February 2007

Virtual Rinex Data Download

End

Procedures

-

Lapangan&pejabat : Static + Virtual

Cadastral Control Infrastructure

Rinex [2 of 11]

Equipment Preparation (Check List) 1. 2. 3. 4. 5. 6.

Rover Receiver Data logger Reconnaisance Survey Report Tripod or Fixed Height/Telescopic Bipod Field Form Lain-lain peralatan

GPS Receiver Configuration 1. 2.

5 second recording interval Minimum number of satellites = 1 Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static +

Cadastral Control Infrastructure

Virtual Rinex [3 of 11]

Field Observation [1 of 2] •

2.

• • •

Mengisi Field Form • Nombor Stesen/Code • Ketinggian Antenna • Masa Mula Cerapan Cerapan Statik [Epoch 01]  Tempoh Cerapan > 5 Minit  Tracked Satellites > 5  Tempoh Cerapan > 30 Minit  Tracked Satellites = 4  End Survey Ukur Semula Ketinggian antenna - semakan Kemaskini Field Form Check Tripod/Bipod Centering and Verticality Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static +

Cadastral Control Infrastructure

Virtual Rinex [4 of 11]

Field Observation [2 of 2] 6. Cerapan Statik [Epoch 02] 

Tempoh Cerapan > 5 Minit 



Tempoh Cerapan > 30 Minit 



Tracked Satellites > 5 Tracked Satellites = 4

End Survey

7. Kemaskini Field Form

Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static +

Cadastral Control Infrastructure

Virtual Rinex [5 of 11]

Data Download 1. Connect Receiver ke PC 2. Menggunakan software yang dibekalkan, muat turun set data berikut: GPS raw data • Namakan data files dengan nama-nama STESEN atau apa-apa nama yang difikrkan sesuai. • Convert GPS raw data ke Rinex format • Backup data set:1. Raw Data in manufacturer proprietary format 2. Raw Data in RINEX format Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static +

Cadastral Control Infrastructure

Virtual Rinex [6 of 11]

Virtual Rinex Download: •



Log in ke dalam server MyRTKnet – JUPEM GEOPORTAL Hasilkan 5“ Virtual Rinex Data berdasarkan approximate coordinates dan tempoh cerapan yang diambil daripada 2 sesi cerapan.

Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static + Virtual

Cadastral Control Infrastructure

Rinex [7 of 11]

Data Processing: •

Menggunakan manufacturer‘s GPS processing software, import data cerapan dan VRINEX.



Set Virtual Rinex Data (VRS) sebagai stesen RUJUKAN



Lakukan baseline processing menggunakan perisian yang dibekalkan. Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static +

Cadastral Control Infrastructure

Virtual Rinex [8 of 11]

Baseline Analyses [1 of 2]: 2.

Baseline solution analyses: • • • • •

Solution Type [Ambiguity/Bias Fixed] RMS Reference Variance Ratio Satellites Residuals Plot

Kursus Intensif Jurukur) 29 February 2007

Procedures

-

Lapangan&pejabat : Static +

Cadastral Control Infrastructure

Virtual Rinex [9 of 11]

Baseline Analyses [2 of 2]: JUP1

W0127

Epoch 01

Epoch 02

Kursus Intensif Jurukur) 29 February 2007

-

Procedures

Lapangan&pejabat : Static + Virtual

Cadastral Control Infrastructure

Rinex [10 of 11]

Post-Processed Coordinates Comparison: JUP1 Epoch

Length (m)

Ratio

Ref. Var.

RMS (m)

Sol.

1

15.492

10.2

7.102

0.010

L1-Fixed

3

10

12.91672

101

43

03.50515

67.139

2

15.488

8.3

3.520

0.007

L1-Fixed

3

10

12.91693

101

43

03.50523

67.121

-0.0024

0.018

Latitude

Coordinates Difference (m)

Longitude

-0.0063

Ell. Hgt (m)

W0127 Epoch

Length (m)

Ratio

Ref. Var.

RMS (m)

Sol.

1

21.462

7.3

4.040

0.008

L1-Fixed

3

12

41.55836

101

39

14.58268

45.670

2

21.402

3.7

4.334

0.007

L1-Fixed

3

12

41.55303

101

39

14.57968

46.039

0.090

-0.369

Latitude

Coordinates Difference (m)

Acceptance Criteria

Longitude

0.1599

< 20 mm Kursus Intensif Jurukur) 29 February 2007

< 20 mm

Ell. Hgt (m)

< 60 mm

Procedures

-

Lapangan&pejabat : Static + Virtual

Cadastral Control Infrastructure

Rinex [11 of 11]

Average Coordinates:

JUP1

Epoch

Length (m)

Ratio

Ref. Var.

RMS (m)

Sol.

1

15.492

10.2

7.102

0.010

L1-Fixed

3

10

12.91672

101

43

03.50515

67.139

2

15.488

8.3

3.520

0.007

L1-Fixed

3

10

12.91693

101

43

03.50523

67.121

3

10

12.91683

101

43

03.50519

67.130

Average Coordinates

Latitude

Kursus Intensif Jurukur) 29 February 2007

Longitude

Ell. Hgt (m)

Cadastral Control Infrastructure

Procedures –

Lapangan & Padang : Coordinates Transformation:  Transformation  



GDM2000 to Geocentric Cassini-Soldner GDM2000 to Geocentric RSO

Software  

Customized or commercial Software Verification

Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Data Serahan Each of CCI Points [1 of 2]: 

Teknik Real-Time  Scanned Field Form  Raw Data  Real-Time Data dalam Ascii Format  Rinex Data daripada GPS Receiver  Virtual Rinex Data  Real-Time Analisis dan Perbandingan  Coordinates Repeatability  Perbezaan koordinat antara Epochs  Hasil Post-Processed Kinematic  Solution Summary  Coordinates Repeatability  Perbezaan koordinat antara Epochs  Perbezaan koordinat antara teknik Real-Time dan PostProcessed. Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

Data Serahan Each of CCI Points [2 of 2]:  Post-Processed Static + Virtual Rinex  

Scanned Field Form Raw Data  



Rinex Data daripada GPS Receiver Virtual Rinex Data

Post-Processed Static Results  

Baseline Solutions Coordinates Difference between Epochs

Kursus Intensif Jurukur) 29 February 2007

Cadastral Control Infrastructure

TAMAT

TERIMA KASIH

Kursus Intensif Jurukur) 29 February 2007

Related Documents

Prosedur Cci
May 2020 36
Document Cci
May 2020 21
Cci Katalogas
April 2020 17
Prosedur
November 2019 54
Como Poner El Cci
October 2019 46
Cci Write Up .docx
April 2020 15

More Documents from "Shaurya Aron"