Chapter 1 INDICATOR STATEMENT

INDICATOR:

TECHNICAL TEAM PRODUCTIVITY

DEFINITION: The indicator in this study is the productivity of the technical team of the department based on documented job report service hours (completed/uncompleted) compared with the total number of hours available. TYPE OF INDICATOR This is a rate-based outcome indicator. RELEVANCE Provide feedback to technical staff and hospital administration regarding utilization of available time for department support activities. PROCEDURE 1. Data will be gathered monthly from the work-order records history. Analysis will be performed base from the trend of the previous monthly data in monthly interval. A technical staff available hour is calculated in monthly. 2. The base time available is 192 hours (48 hours/week x 4 weeks) per individual. Overtime work will be added during interval. Holidays, sick days and vacations days will be subtracted during the interval. 3. Productivity (maintenance or management) average = (TCJH+TUJH)/AWH TCJH = total hours of technical staff completed job/number of staff TUJH = total hours of technical staff uncompleted job/number of staff AWH = available working hours per month 4. Indicator threshold A. At least 50% of available technical staff time will be spent providing equipment maintenance support services (resolving equipment problems and scheduled internal Periodic Preventive Maintenance (PPM)). B. At least 25% of available technical staff time will be spent equipment management support services (installation, acceptance testing, incoming inspections, equipment inventory database management, and hazard notification review). 1—1

TECHNICAL TEAM PRODUCTIVITY INDICATOR

5. The indicator will be compared with the threshold, and the information will be provided to the team and individual. The team and individual data can be summoned and reviewed by the department. Historical indicator information will be utilized to determine trends and patterns. INDICATOR DATA COLLECTION Data will be encoded on Microsoft Excel sheet to record all the information needed and will be statistically analyzed.

1—2

TECHNICAL TEAM PRODUCTIVITY INDICATOR

PILOT STUDY

1—3

TECHNICAL TEAM PRODUCTIVITY INDICATOR

PROBLEM STATEMENT 1. According to the statistical data A. The average hours for maintenance work are % from January 15 to April 2015 which is low. B. The average hours for management work are % from January 15 to April 2015 which is low. C. Average work hour each staff members is also not well distributed. 2. Causes A. Most machines are currently under warranty. B. Incomplete information on job order reports. C. Work order requests without job reports . D. Work is not well distributed to technical staff. E. Change in technical staff (engineer or technician). GOAL STATEMENT 1. To increase maintenance productivity to 50% 2. To increase management productivity to 25%. 3. To orient the technical staff about work order requests and job order reports. 4. To distribute the workload evenly to all technical staff.

1—4

TECHNICAL TEAM PRODUCTIVITY INDICATOR

IMPROVEMENT TEAM SELECTION BMED QM Head Coordinator BMED Assistant QM Coordinator BMED Technical Team Coordinators BMED Equipment Management Coordinator BMED Director

: : : : : :

Engr. Joey C. Bagatela Engr. Jayaprakash Veerasamy Ahmed Shafek Ahmed Mohammed Abdullah Saleh Alharbi Engr.Ahmed Hamad Alhumid

IMPROVEMENT PROJECT PLAN PROCEDURE Define the Indicator Measure Statistics Analyze Statistics Improvements Evaluation

1—5

START DATE August 31, 2014 September 14, 2014 September 27, 2014 October 30, 2014 November 30, 2014

TECHNICAL TEAM PRODUCTIVITY INDICATOR

END DATE September 14, 2014 September 27, 2014 October 30, 2015 November 30,2014 January 01,2015

Chapter 2 STATISTICAL ANALYSIS

2—6

TECHNICAL TEAM PRODUCTIVITY INDICATOR

Chapter 3 QUALITY IMPROVEMENT PROCESSES

The Quality Improvement Team is going to do the following actions from January 2015 to May 2015.

TASK

INCHARGE

Meeting with the Technical Staff and summon in individuals that did not meet the threshold

Bio-Medical Engineering Department Director

DATE January 2015

Quality Improvement Team

February and March 2015

Quality Improvement Team

April 2015

Bio-Medical Engineering Department Director

May 2015

Preparing the procedures and collecting data

Analyze the statistics of collected data if there is improvement

Meeting about the analysis report

3—7

TECHNICAL TEAM PRODUCTIVITY INDICATOR

Related Documents

Productivity
November 2019 52
Productivity
June 2020 26
Productivity
November 2019 36
Productivity
May 2020 27
Final Productivity
June 2020 34