Precast Slab Design

India Pavilion at World Expo 2010, Shangai, China

DESIGN OF PRE-CAST SLAB

Type :- Oneway slab

M 25 CONC

Fe 415

References

0.860

Length Lx =

0.76

+ 0.10 =

0.860 m c/c

Length Ly =

3.66

0.00 =

3.660 m c/c

TRIAL DEPTH Assumed α1

0.34 % steel

=

for fy = 415

1.6

IS-456:2000

for 210

fs = 0.58 fy

Basic L / d ratio rb =

20 for Simply supported slab

Allowable L / d ratio ra =

1.6

x 20

=

32

Reqd =

Lx / ra

860

/

32

=

Assumed d'

=

Reqd D =

=

20 mm for 26.9

fig. 4

26.9 mm

Fe 415

+ 20 =

46.9 mm

Assume slab thickness

0.120 m

120 mm

Eff. Depth LOADS O S:

0.100 m

100 mm

OK

Dead load :-Self Wt.

0.120

x 25.00

Wt. of land-scapping (200mm th.) Floor finish(water-proofing) WEIGHT OF WALL TOTAL Wud =

Live load :--

=

3.00 KN/m2

= =

3.75 KN/m3 1.25 KN/m2

= Wd = 1.5*Wd say Wl =

Wul =

1.5 *Wl

TOTAL LOAD Wud =

1.00 9.00 13.500 13.500

KN/m3 KN/m2 KN/m2 KN/m2

5.000 KN/m2 7.500 KN/m2 21.000 KN/m2

DESIGN MOMENTS As per IS 456 - 2000 Ly/ Lx =

4.82

>

2 IS-456:2000

Bending moment at any section =

2

Wud*l / 8 =

B.M at mid of outer span SAY

=

Tb-12

1.941

CL-22.5.1

2.000

KNm

1000

mm

CHECK FOR CONCRETE DEPTH Mur.max = Ru max bd2 for slab b = Ru.max =

3.45 N/mm2

For

1

M 25

Fe 415

SP -16

Precast Slab Design

India Pavilion at World Expo 2010, Shangai, China

For outer bars , Mur.max =

3.45

x 1000

=

x 100

34.50 KNm

2

x

1.00E-06

>

2.00 KNm

OK

Check for Concrete depth is satisfied

MAIN STEEL Required Ast = (0.5 fck/fy)[1 - 1 - 4.6 Mud / (fck bd2)] bd ]

span position

Mud

d

Req. Ast

Dia.

KNm

mm

mm2

mm

mm

mm2

mm2

2.00

100

55.94

8

200

251.33

150

x 1000

x 100.0

/ 100.0

main steel

Spacing Prov. Ast

Amin

DISTRIBUTION STEEL Dist. Reinforcement =

120

mm2

= 0.12 =

8ϕ @

Provide

200 c/c

120 (Ast prov =

251.33 mm2 )

as Dist. Steel

CHECK FOR SHEAR pt

=

Tuc =

0.251 %

0 361 0.361

IS -456-2000

N/mm2

pt

Tb-19 Tc

Vuc = k Tuc bd k =

Vuc

1.4

for overall

=

1.40 = 50.489

x 0.361

depth

x 1000

150 mm or less

x 100 / 1000

KN

Shear force at any section

Vu.max =Wud*l/2

Maximum Shear occurs at support next to end support Vu.max =

9.030 KN

Vuc > Vu.max Check for shear is satisfied CHECK FOR DEFLECTION :--

pt provided =

0.251 %

pt assumed =

0.340 %

pt assumed

>

pt provided

o.k

2

O.K

SAFE

0.15

0.28

0.25

0.36

0.50

0.48

0.25

0.36