PRECAST BEAM
The first my job is`t in adi oman, at supervisor potition. I worked precast beam, from 9 December 2008 until now. Whatever that, I just work at precast beam. And, if I permit to make some resume of my job, maybe for some one or actually for my self. This is the resume : Material
:
1. balok kayu (kasau) 2. ms box (Hollow) 3. Plywood 4. terod 5. wingnut 6. paku 7. minyak polyrelease 8. sekrup 9. selang Tools
:
1. Gergaji (mesin & tangan) 2. meteran 3. Palu 4. Jack hammer ( Drill ) 5. kapak 6. pahat 7. obeng (mesin & Manual) 8. linggis
Method
:
1. The first thing we must to do is make prepare for the floor.
2. Than we must make the bottom / shift for form work (precast beam)
3. Put the steel beam
4. Pasang bekisting / tembereng kolom Kayu Besi
Bekisting
Lantai
5. Fill with concrete
6. Opened the frame or bekisting after 10 hour ( can`t less from 4 hours, agree with situation), After than curing the beam.
Gambar Alat Lifting (Alat Pengangkut Beam) Fungsinya : agar pada saat pengangkatan tidak terjadi pembenanan Liftingterjadinya Beam terpusat, menghindari patahan.
Seling 2 meter Segel 6 Ton
BEAM