PPAP Level III REQUIREMENTS
PPAP Submission Levels Level Level Level Level Level
1 2 3 4 5
Part Submission Warrant (PSW) only. PSW with product samples and other items requested. PSW with product samples and complete supporting data. PSW and other items requested. PSW with product samples and complete supporting data available for review at the manufacturer.
Note: Level 3 will typically be used. Blackmer’s minimum supporting data is indicated below. Yellow items are always needed. ITEM
REQUIREMENT
COMMENTS
Design Records
Rarely Specified
Blackmer typically owns all design.
Engineering Change Documents Customer Engineering Approval Design FMEA
Rarely Specified
Process Flow Diagrams Process FMEA
Always required. Always required.
Dimensional Results Material Performance Test Results Initial Process Study Measurement System Analysis Study Qualified Laboratory Documentation Control Plans
Always required. Always required.
Rarely Specified
May be requested to assure control of special processes.
Rarely Specified
As specified by QA As specified by QA As specified by QA Always required.
Part Submission Warrant (PSW) Appearance Approval Report Bulk Material Requirements Sample Product
Always required.
Master Samples
As specified by QA
Checking Aids
As specified by QA
Records of Compliance
As specified by QA
As specified by QA As specified by QA Always required.