Policy Handbook Printed 17 Oct-06

  • Uploaded by: JOSEPH MWIRIGI
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Policy Handbook Printed 17 Oct-06 as PDF for free.

More details

  • Words: 31,057
  • Pages: 88
INTERNATIONAL AID SERVICES ’Creating a positive reaction’

POLICY HANDBOOK VERSION 1.0 - 2006

Our mission is ‘to save lives, promote self-reliance and dignity and enable people to invest in their future, regardless of race, creed, gender or nationality of the recipient’.

TABLE OF CONTENTS PREAMBLE ...............................................................................................................................................8 INTRODUCTION TO IAS........................................................................................................................9 INTRODUCTION .........................................................................................................................................9 IAS Mission Statement .........................................................................................................................9 IAS Vision Statement............................................................................................................................9 OBJECTIVES ..............................................................................................................................................9 ACTIVITIES AND WAYS OF IMPLEMENTATION............................................................................................9 AGRICULTURE ......................................................................................................................................10 INTRODUCTION .......................................................................................................................................10 OBJECTIVES ............................................................................................................................................10 Goal ...................................................................................................................................................10 Purpose..............................................................................................................................................10 Outputs ..............................................................................................................................................10 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................10 Areas of intervention .........................................................................................................................10 Specific programme implementation .................................................................................................10 Sector intervention guidelines. ..........................................................................................................11 ASSUMPTIONS AND RISKS .......................................................................................................................11 EDUCATION ...........................................................................................................................................12 INTRODUCTION .......................................................................................................................................12 OBJECTIVES ............................................................................................................................................12 Goal ...................................................................................................................................................12 Purpose..............................................................................................................................................12 Outputs ..............................................................................................................................................12 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................12 Activities ............................................................................................................................................12 Other guiding principles concerning implementation .......................................................................13 Community inputs ......................................................................................................................................... 13 IAS Education Inputs..................................................................................................................................... 13 Support and encourage .................................................................................................................................. 13

Special Criteria for support to community based schools and training institutions:.........................13 IAS can terminate support to any school or schools on the following grounds ............................................. 14

ASSUMPTIONS AND RISKS .......................................................................................................................14 HEALTH...................................................................................................................................................15 INTRODUCTION .......................................................................................................................................15 OBJECTIVES ............................................................................................................................................15 Goal ...................................................................................................................................................15 Purpose..............................................................................................................................................15 Outputs ..............................................................................................................................................15 ACTIVITIES AND WAYS OF IMPLEMENTATION .........................................................................................15 Promotional activities........................................................................................................................15 Operational activities ........................................................................................................................16 Capacity enhancement activities .......................................................................................................16 ASSUMPTIONS AND RISKS .......................................................................................................................16 WATER AND SANITATION .................................................................................................................17 INTRODUCTION .......................................................................................................................................17 OBJECTIVES ............................................................................................................................................17 Goal ...................................................................................................................................................17 Purpose..............................................................................................................................................17 Outputs ..............................................................................................................................................17 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................18 Activities ............................................................................................................................................18 Approaches ........................................................................................................................................18 Community-based.......................................................................................................................................... 18 Training and capacity building ...................................................................................................................... 18

Inter-agency cooperation ............................................................................................................................... 18

ASSUMPTIONS AND RISKS .......................................................................................................................18 CRITERIA FOR STARTING A PROJECT .........................................................................................20 INTRODUCTION .......................................................................................................................................20 OBJECTIVES ............................................................................................................................................20 Goal ...................................................................................................................................................20 Purpose..............................................................................................................................................20 Outputs ..............................................................................................................................................20 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................20 ASSUMPTIONS AND RISKS .......................................................................................................................21 CRITERIA FOR CLOSING A PROJECT............................................................................................22 INTRODUCTION .......................................................................................................................................22 OBJECTIVES ............................................................................................................................................22 Goal ...................................................................................................................................................22 Purpose..............................................................................................................................................22 Outputs ..............................................................................................................................................22 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................22 ASSUMPTIONS AND RISKS .......................................................................................................................23 EXIT STRATEGY ...................................................................................................................................24 INTRODUCTION .......................................................................................................................................24 OBJECTIVES ............................................................................................................................................24 Goal ...................................................................................................................................................24 Purpose..............................................................................................................................................24 Outputs ..............................................................................................................................................24 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................24 Exit criteria........................................................................................................................................25 When is the exit point? .................................................................................................................................. 25 When should you plan to exit? ...................................................................................................................... 25 Who should be involved in the process?........................................................................................................ 25 What needs to remain in the area? ................................................................................................................. 25 How will IAS prevent a recurrence of the original problems?....................................................................... 25 Handover process .......................................................................................................................................... 25 Checklist of other vital points to consider before exit ................................................................................... 25

ASSUMPTIONS AND RISKS .......................................................................................................................26 EMERGENCY RESPONSE....................................................................................................................27 INTRODUCTION .......................................................................................................................................27 OBJECTIVES ............................................................................................................................................27 Goal ...................................................................................................................................................27 Purpose..............................................................................................................................................27 Outputs ..............................................................................................................................................27 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................27 ASSUMPTIONS AND RISKS .......................................................................................................................28 ENVIRONMENT .....................................................................................................................................29 INTRODUCTION .......................................................................................................................................29 OBJECTIVES ............................................................................................................................................29 Goal ...................................................................................................................................................29 Purpose..............................................................................................................................................29 Outputs ..............................................................................................................................................29 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................30 Check list ...........................................................................................................................................30 ASSUMPTIONS AND RISKS .......................................................................................................................31 ETHICS AND INTEGRITY ...................................................................................................................32 INTRODUCTION .......................................................................................................................................32 OBJECTIVES ............................................................................................................................................32 Goal/purpose .....................................................................................................................................32 Outputs ..............................................................................................................................................32 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................32

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 2

Actions instituting corruption, fraud, theft and/or maladministration...............................................32 Protection of whistle blowers ............................................................................................................33 The IAS Code of Conduct ..................................................................................................................33 ASSUMPTIONS AND RISKS .......................................................................................................................33 GENDER...................................................................................................................................................34 INTRODUCTION .......................................................................................................................................34 OBJECTIVES ............................................................................................................................................34 Goal ...................................................................................................................................................34 Purpose..............................................................................................................................................34 Outputs ..............................................................................................................................................34 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................34 ASSUMPTIONS AND RISKS .......................................................................................................................35 HIV/AIDS..................................................................................................................................................36 INTRODUCTION .......................................................................................................................................36 OBJECTIVES ............................................................................................................................................36 Goal ...................................................................................................................................................36 Purpose..............................................................................................................................................36 Outputs ..............................................................................................................................................36 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................36 The key elements of our policy are: ...................................................................................................36 HIV/AIDS and conflicts .....................................................................................................................37 Specific activities during programme implementation include: ........................................................37 ASSUMPTIONS AND RISKS .......................................................................................................................37 INTEGRATED COMMUNITY EMPOWERMENT PROGRAMME ...............................................39 INTRODUCTION AND BACKGROUND ........................................................................................................39 What is Integrated Community Empowerment Programme? ............................................................39 OBJECTIVES ............................................................................................................................................40 Goal ...................................................................................................................................................40 Purpose..............................................................................................................................................40 Outputs ..............................................................................................................................................40 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................40 The Approaches of ICEP ...................................................................................................................40 The Stages of ICEP............................................................................................................................41 ICEP Functions .................................................................................................................................41 ICEP Programme Implementation ....................................................................................................41 ASSUMPTIONS AND RISKS .......................................................................................................................41 PARTNERSHIP – PROGRAMME COUNTRIES ...............................................................................42 INTRODUCTION .......................................................................................................................................42 IAS believes in the 10 following principles of partnership ................................................................42 OBJECTIVES ............................................................................................................................................42 Goal ...................................................................................................................................................42 Purpose..............................................................................................................................................42 Outputs ..............................................................................................................................................42 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................43 Cross-sectoral collaboration within IAS ...........................................................................................43 Co-operation with beneficiaries. .......................................................................................................43 Co-operation with International- and national organisations...........................................................43 ASSUMPTIONS AND RISKS .......................................................................................................................43 PEACE BUILDING, RECONCILIATION, DEMOCRACY AND HUMAN RIGHTS ....................45 INTRODUCTION .......................................................................................................................................45 OBJECTIVES ............................................................................................................................................45 Goal ...................................................................................................................................................45 Purpose..............................................................................................................................................45 Outputs ..............................................................................................................................................45 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................45 General ..............................................................................................................................................45 Role of IAS .........................................................................................................................................46 Check list ...........................................................................................................................................46 International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 3

ASSUMPTIONS AND RISKS .......................................................................................................................46 POST TRAUMATIC STRESS TRAINING ..........................................................................................48 INTRODUCTION .......................................................................................................................................48 OBJECTIVES ............................................................................................................................................48 Goal ...................................................................................................................................................48 Purpose..............................................................................................................................................49 Outputs ..............................................................................................................................................49 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................49 ASSUMPTIONS AND RISKS .......................................................................................................................49 POVERTY REDUCTION .......................................................................................................................50 INTRODUCTION .......................................................................................................................................50 Categories of Poverty ........................................................................................................................50 Dependants .................................................................................................................................................... 50 The transitory poor ........................................................................................................................................ 50 The economically active poor........................................................................................................................ 50 The landless and pastoralists ......................................................................................................................... 50 Internally displaced persons and refugees ..................................................................................................... 50 The urban poor .............................................................................................................................................. 50

OBJECTIVES ............................................................................................................................................51 Goal ...................................................................................................................................................51 Purpose..............................................................................................................................................51 Outputs ..............................................................................................................................................51 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................51 ASSUMPTIONS AND RISKS .......................................................................................................................51 SECURITY MANUAL ............................................................................................................................53 INTRODUCTION .......................................................................................................................................53 The Use of the Security Manual.........................................................................................................53 OBJECTIVES ............................................................................................................................................53 Goal ...................................................................................................................................................53 Purpose..............................................................................................................................................53 Outputs ..............................................................................................................................................53 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................53 Responsibilities..................................................................................................................................53 Responsibilities of IAS.................................................................................................................................. 54 Responsibilities of IAS employees ................................................................................................................ 54

IAS provision .....................................................................................................................................54 Protection ..........................................................................................................................................54 Property security............................................................................................................................................ 54 Vehicle security ............................................................................................................................................. 54 Travel security ............................................................................................................................................... 55

Communication..................................................................................................................................56 Mine awareness .................................................................................................................................56 Land mines .................................................................................................................................................... 56 Typical mine areas......................................................................................................................................... 56 Precautions when walking in high risk areas ................................................................................................. 57 Vehicle and Land mines ................................................................................................................................ 57 How to get out from a minefield?.................................................................................................................. 57

Facing Hostility .................................................................................................................................58 When IAS is a target ..........................................................................................................................58 Hold-ups and hostage .................................................................................................................................... 58

The Aftermath ....................................................................................................................................59 Relocation and Evacuation................................................................................................................59 To stay or leave..................................................................................................................................59 Contingency plans .............................................................................................................................59 Type of evacuation ........................................................................................................................................ 59 Duration of withdrawal.................................................................................................................................. 60 Means of withdrawal ..................................................................................................................................... 60 Project equipment.......................................................................................................................................... 60

Evacuation plan.................................................................................................................................60 Contents of the plan....................................................................................................................................... 60

ASSUMPTIONS AND RISKS .......................................................................................................................60

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 4

SPECIAL NEEDS EDUCATION ...........................................................................................................61 INTRODUCTION .......................................................................................................................................61 OBJECTIVES ............................................................................................................................................61 Goal and Purpose..............................................................................................................................61 Output ................................................................................................................................................61 What are special educational needs? ................................................................................................61 Basic principles .................................................................................................................................62 Guiding principles ......................................................................................................................................... 62

Provision............................................................................................................................................62 ASSUMPTIONS AND RISKS .......................................................................................................................63 VEHICLE .................................................................................................................................................64 INTRODUCTION .......................................................................................................................................64 OBJECTIVES ............................................................................................................................................64 Goal ...................................................................................................................................................64 Purpose..............................................................................................................................................64 Outputs ..............................................................................................................................................64 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................64 Approved Drivers ..............................................................................................................................64 Driver Responsibilities ......................................................................................................................65 ASSUMPTIONS AND RISKS .......................................................................................................................65 VOLUNTEER...........................................................................................................................................66 INTRODUCTION .......................................................................................................................................66 OBJECTIVES ............................................................................................................................................66 Goal ...................................................................................................................................................66 Purpose..............................................................................................................................................66 Outputs ..............................................................................................................................................66 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................66 ASSUMPTIONS AND RISKS .......................................................................................................................67 EMPLOYMENT ......................................................................................................................................68 INTRODUCTION .......................................................................................................................................68 People in Aid Code ............................................................................................................................68 OBJECTIVES ............................................................................................................................................68 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................68 IAS as employer .................................................................................................................................68 Job-description .............................................................................................................................................. 68 Requirement for employees........................................................................................................................... 69

The employee .....................................................................................................................................69 Service........................................................................................................................................................... 69 Moral standard............................................................................................................................................... 69 Teamwork...................................................................................................................................................... 69 Background and education ............................................................................................................................ 69 Cultural adjustment ....................................................................................................................................... 69

Termination of Services .....................................................................................................................69 Temporary Employment.....................................................................................................................69 Short term Contract Employees/Consultants.....................................................................................70 Duration of the contract ....................................................................................................................70 Payment policies and procedures ......................................................................................................70 Salaries/Wages .............................................................................................................................................. 70 Working hours ............................................................................................................................................... 70 Allowances .................................................................................................................................................... 70 Loans ............................................................................................................................................................. 70 Terminal Benefits/Gratuity............................................................................................................................ 70 Death ............................................................................................................................................................. 70

Staff development...............................................................................................................................71 Training ......................................................................................................................................................... 71 Promotion ...................................................................................................................................................... 71

Leave and sickness.............................................................................................................................71 Annual Leave ................................................................................................................................................ 71 Sick Leave ..................................................................................................................................................... 71 Maternity Leave............................................................................................................................................. 71 Compassionate Leave .................................................................................................................................... 71

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 5

Unpaid Leave ................................................................................................................................................ 72 Holidays ........................................................................................................................................................ 72

Disciplinary procedures ....................................................................................................................72 Minor offences............................................................................................................................................... 72 First or Second Offence................................................................................................................................. 72 Failure to react positively on First Warning .................................................................................................. 72 Second Warning ............................................................................................................................................ 72 Third/Final Warning Suspension ................................................................................................................... 72 Suspension without Pay and Summery Dismissal ......................................................................................... 72 Serious Offences............................................................................................................................................ 73 Appeals.......................................................................................................................................................... 73 Gross Misconduct.......................................................................................................................................... 73

Grievances procedures ......................................................................................................................73 First point of Grievance................................................................................................................................. 73 Second point of Grievance............................................................................................................................. 73 Grievance against the Country Director/Representative or the Organisation represented by the Director/Representative ................................................................................................................................. 74

ASSUMPTIONS AND RISKS .......................................................................................................................74 RECRUITMENT......................................................................................................................................75 INTRODUCTION .......................................................................................................................................75 OBJECTIVES ............................................................................................................................................75 Goal/purpose .....................................................................................................................................75 Outputs ..............................................................................................................................................75 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................75 Equal Employment Opportunity ........................................................................................................75 Confidentiality ...................................................................................................................................75 Employment of Relatives....................................................................................................................75 Recruiting ..........................................................................................................................................76 Recruitment Process ...................................................................................................................................... 76 Recruitment ................................................................................................................................................... 76 Interviews ...................................................................................................................................................... 76 Hiring Process ............................................................................................................................................... 77

ASSUMPTIONS AND RISKS .......................................................................................................................77 REST AND RELAXATION....................................................................................................................78 INTRODUCTION .......................................................................................................................................78 OBJECTIVES ............................................................................................................................................78 Goal ...................................................................................................................................................78 Purpose..............................................................................................................................................78 Outputs ..............................................................................................................................................78 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................78 Authority for Rest and Relaxation (R&R) Leave ...............................................................................78 Eligibility for Rest and Relaxation Leave ..........................................................................................79 Rest and Relaxation Leave Entitlements............................................................................................79 Timing of Rest and Relaxation Leave ................................................................................................79 Cancellation of Rest and Relaxation Leave .......................................................................................79 Location of Rest and Relaxation Leave .............................................................................................79 Accommodation for Rest and Relaxation Leave ................................................................................79 Expense Allowance during Rest and Relaxation Leave .....................................................................80 ASSUMPTIONS AND RISKS .......................................................................................................................80 STAFF HEALTH .....................................................................................................................................81 INTRODUCTION .......................................................................................................................................81 OBJECTIVES ............................................................................................................................................81 Goal ...................................................................................................................................................81 Purpose..............................................................................................................................................81 Outputs ..............................................................................................................................................81 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................81 Pre-employment Medical examinations.............................................................................................81 Employment Medical examinations ...................................................................................................81 Out-patient care.................................................................................................................................82 Staff insurance ...................................................................................................................................82 Chronic illness...................................................................................................................................82 ASSUMPTIONS AND RISKS .......................................................................................................................82 International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 6

STAFF TRAINING AND DEVELOPMENT ........................................................................................83 INTRODUCTION .......................................................................................................................................83 OBJECTIVES ............................................................................................................................................83 ACTIVITIES AND WAYS OF IMPLEMENTATION..........................................................................................83 Responsibilities..................................................................................................................................83 Education department .................................................................................................................................... 83 The Individual ............................................................................................................................................... 83 Line Managers/Supervisors ........................................................................................................................... 83

Employee orientation programmes....................................................................................................84 Performance review and development plans .....................................................................................84 Forms of training in IAS ....................................................................................................................84 In- House Learning........................................................................................................................................ 84 External Training........................................................................................................................................... 84

Location of Learning .........................................................................................................................84 In-house learning ........................................................................................................................................... 85 External Training........................................................................................................................................... 85

Nomination for training.....................................................................................................................85 Full time studies.................................................................................................................................85 Priority Areas for Full Time Studies.............................................................................................................. 85 Study leave .................................................................................................................................................... 86 Scholarship .................................................................................................................................................... 86 Applications................................................................................................................................................... 86 Applicants Responsibilities ........................................................................................................................... 86

Distance learning ..............................................................................................................................86 Training evaluation system................................................................................................................86 Pre-course...................................................................................................................................................... 87 End of Course ................................................................................................................................................ 87 Post Course Evaluation.................................................................................................................................. 87

Staff library........................................................................................................................................87 ASSUMPTIONS AND RISKS .......................................................................................................................87

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 7

PREAMBLE Since the inception of IAS in 1989 there has been a considerable amount of policy documents circulating within the organisation. A policy working committee was therefore appointed to consolidate and streamline these documents into one single working document. The policy handbook is intended to be used on all levels of the organisation and towards all stakeholders. It consists of living documents which will be updated on a regular basis. There are many different types of policy documents. In this handbook they are divided into the following categories: • •







Introductory paper; giving a brief introduction of IAS and stating the organisations mission statement: o Introduction to IAS Sector policies; outlining the strategies and approaches of IAS various sectors: o Agriculture o Education o Health o Water and Sanitation Project cycle policies; policies related to the project cycle: o Criteria for Starting a Project o Criteria for Closing a Project o Exit Strategy General policies; policies mainly not directly linked to any specific activity or sector, but applicable in all interventions: o Emergency Response o Environment o Ethics and Integrity o Gender o HIV/AIDS o Integrated Community Empowerment Programme o Partnership – Programme Countries o Peace Building, Reconciliation, Democracy and Human Rights o Post Traumatic Stress Training o Poverty Reduction o Security Manual o Special Needs Education o Vehicle o Volunteer Human resource policies; policies linked to the management of IAS personnel: o Employment o Recruitment o Rest and Relaxation o Staff Health o Staff Training and Development

The method being used in this handbook is based on the logical framework. It is assumed that this will provide a logical and easy way of examining the contents of each policy. It also has advantages in the stage of programme planning and proposal writing. If there are any questions related to the contents of this handbook, please do not hesitate to inform us accordingly. /IAS Policy working group Stockholm, October 2006

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 8

INTRODUCTION TO IAS

Introduction International Aid Services (IAS) is a non-political and non-profitable humanitarian relief- and development organisation. It was founded in 1989 with the purpose of assisting people in need. Over the years, IAS has grown considerably and is now represented in 18 countries with approximately 400 employees. During the first 15 years the organisation used ‘Sweden’ in its logo; and therefore was called International Aid Sweden (IAS). In the last couple of years, IAS northern offices have expanded to also include Denmark, Norway, Germany and USA. To make the organisational name more suitable for the partners in these countries, IAS changed its name to ‘International Aid Services’ with effect from January 2004. IAS desire is to support projects with a ripple, multiplying and reproducing effect. IAS Mission Statement “To save lives, promote self-reliance and dignity and enable people to invest in their future, regardless of the race, creed, gender or nationality of the recipient.” IAS Vision Statement “A world where resources and opportunities are distributed in a just and fair way and where poverty is eradicated and communities are self reliant.”

Objectives The goal and purpose for this policy is to create an overview of IAS as an organisation and the beliefs and values it represents.

Activities and ways of implementation IAS is currently involved in four major sectors, namely: • • • •

Water and sanitation Agriculture Health Education

The geographical focus is mainly the Eastern parts of Africa, but IAS also supports projects elsewhere, for example West Africa, South America and Asia. IAS activities are guided by the Sphere Project standards (Humanitarian Charter and Minimum Standards in Disaster Response) and United Nations Millennium Development goals. The organisation is also a signatory to the ICRC Code of Conduct. For more information, see IAS policy documents and www.ias.nu. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 9

AGRICULTURE

Introduction The policy guideline developed by the agriculture sector will act as reference tool for the implementation of agricultural projects in the organisation. Attempts were made to include conditions under various operational environments in respect of tropical agriculture.

Objectives Goal The goal of the sector is to promote self-reliance in food and agricultural development for better living conditions. Relief interventions will still be conceivable in areas of sporadic conflict scenario. Purpose The purpose is to create a better standard of living for the beneficiaries. Outputs It is IAS aim that the outputs will contribute to raising the standard of living for the beneficiaries through promoting self-reliance in food and agricultural development.

Activities and ways of implementation Based on the interpretation of the organisational mission statement, the agriculture sector would want to translate this into action plans to meet food and income security in order to attain an over all individual and community relative security. Hunger, poverty and limited access to resources are recipes for insecurity in any given unit area of livelihood. The sector will focus mainly on planned interventions. However, flexibility will remain the key as these plans may be affected by variation from one geographical area and scenario disparities from another in terms of action plans and implementation procedures. Ideally every element of service provision is to target sustainable livelihood even at emergency level. Areas of intervention The intervention strategy is based on the nature of the scenarios on the ground. The responses are in the following areas: • • •

Relief Recovery Development

Specific programme implementation • Felt need assessment. • Provision of tools and seeds. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 10

• • • • • • • •

Seminars and Skills training. Promotion of appropriate technology (PAT). Supporting local initiatives on improved storage facility. Supporting processing of produce for value addition. Training on market/marketing of agricultural produce. Promoting projects that are environment friendly. Develop livestock sector for both quality milk and meat production. Provision of revolving funds/ loans.

Sector intervention guidelines. • The agriculture sector is aware of the political situation facing third world countries, and would therefore appreciate playing a role in provision of tools and seeds in disaster affected communities. • The sector will also play a role in ensuring food and income security and any other aspect of agricultural development within its capacity during Recovery and Reconstruction phases in any country where its services are needed. • The sector would work with the community to promote food and income security in areas of need. • Agricultural services shall be provided without discrimination in terms of colour, tribe, creed, ethnic background, nationality, gender or political affiliation. • The sector shall ensure efficient utilization of resources to benefit the intended target community. • The agriculture sector appreciates and values the role of Indigenous Community Based Organisations (ICBO) and shall identify partners to work with to promote sustainable agriculture. • The sector shall respect the norms and cultures of the community where its services are needed • The sector shall endeavour to promote coordination and collaboration with relevant authorities and other service providers in areas of operation. • Projects shall be approved for implementation on the basis of community initiative and participation; however, emergency intervention shall be handled as the situations may dictate.

Assumptions and risks • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitudes and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 11

EDUCATION

Introduction Education is essential for any long term development and a vital tool in fighting poverty. The importance of proper educational systems cannot be overemphasized. IAS is working in areas where education is very poor, especially when it comes to girl child education, due to various reasons. The causes of the low access, low retention and high drop out of children particularly for girls include: shortage of well trained and committed teachers; over age pupils or girls; negative cultural attitudes towards girl education; inadequate parents support; poverty; poor resource mobilization and management; shortage of learning/teaching materials; in conducive learning environment: monitoring/ evaluation, and standardization/quality. This policy outlines IAS aim and beliefs in its support in the education sector.

Objectives Goal The goal of this policy is to promote and form recognized education programmes with sustainable strategies in terms of access, equity, retention, quality, relevancy (dignity) and sustainability. Purpose The purpose is to raise the standard of education on a general and national level, as well as individual level for the specific beneficiary. Outputs Quality educational programmes meeting the needs of the beneficiaries and the society as a whole.

Activities and ways of implementation Activities To meet the objectives outlined in this policy, IAS will conduct the following activities: • • • • •

Support the training of competent, highly motivated and committed teachers to enhance access, equity, retention, and quality. Support the provision of basic essential school supplies. Provide assistance for school reconstructions in terms of building materials etc. Encourage community ownership and sustainability of their schools. Assist in the integration of education activities into the sectors of water, health and sanitation, food and economic security, women and youth programmes, income generating activities and others.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 12

• • • • •

Promote the development of special programmes, policies and strategies for marginalized, traumatized and mentally handicapped persons. Participate in collection and analysis of information, which will enhance sustainable education in the beneficiary communities. Jointly participate with local partners in planning, co-ordination, monitoring/ supervision and evaluation exercises. Incorporate IAS general policies when forming the education programmes. Literacy for adults.

Other guiding principles concerning implementation In all IAS interventions, it is crucial to involve the local communities as early as possible and work in close partnership with the local authorities and stakeholders. IAS therefore expects the community to be active and contribute to meet the objectives of the education programmes. Community inputs • Positive attitudes towards ownership of education. • Positive response to invest in education both in kind and cash. • Readily available human and material resources to support education. • Positive initiatives to improve household food security and household incomes to support children both at home and in schools. • Active community participation in sharing of ideas (planning), knowledge and experiences on matters relating to development in education. • Development of supportive education policies. • Enforcement of education policies. • Promotion of Regional and National Education Campaigns. • Parents and Teachers Associations. IAS Education Inputs • Support and strengthen the teachers’ education and training. • Conduct wide community sensitization workshops or meetings on ownership and investment in education. • Encourage and support development of coherent education policies. • Support provision of basic essential school supplies and encourage the development and production of local education materials. • Promote and support provision of Integrated Sustainable Education Programmes. Support and encourage • Data collection and analysis in education. • Regular monitoring and evaluation exercise in education processes. • Inter and intra-collaboration linkages. Special Criteria for support to community based schools and training institutions: As IAS continues its support in the education sector to many communities, it is important to understand the basic rationales behind this venture. This criterion stipulates the area of concern to IAS in the provision of support in the area of education. IAS together with the donor agencies expects a very high degree of transparency and accountability in the management of the projects. The following points will serve as IAS education guidelines or the criteria for support to schools or training institution: • •

The schools must be physically established entities with children, staff and a capacity for learning to take place. The day-to-day running of the school must be done in collaboration with recognised representatives of the community who have positive interest in the school and community. This would take the form of an officially recognised body such as School Management

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 13



• •

• • • •



Committee (SMC), Parents and Teachers’ Association (PTA), Board of Governors (BOG) or any other relevant name that it may have in the community. The schools must be local initiatives with the support of community leadership. It must be understood that IAS does not start or own any school, they are community properties and IAS depends on the kind support of donors that is not permanent. The communities should therefore play a greater role in making the schools self-supporting with the local resources available. The SMC, PTA, BOG, etc. should solve any problems arising within the schools without getting IAS involved. The local authority/agency supporting education should however be informed on all developments within the schools. IAS will also be furnished with the latest data on school’s statistics, staff establishment and pupils’ performance regularly by the school management who will also have the responsibility of ensuring that teaching and learning is taking place in a conducive environment. IAS will create empowerment programmes aimed at building the capacity of the school management towards greater independence in decision-making and self-reliance. It is the responsibility of the SMC, PTA, BOG and School Administration to mobilize the community so as to develop the schools in a sustainable manner in partnership with IAS. The school management should facilitate the regular inspection and supervision of their schools by the mandated IAS staff for monitoring and evaluation purposes. Finances and any other support given to the school must be used for the stated purposes and the leadership of the school must be accountable and trustworthy in this regard. The schools will be provided with guidelines on managing their school finances through PTA /BOG workshops. IAS will not be bound to extra expenses without prior administrative arrangements. Recruitment and termination of services of teachers and any other workers in the schools is the responsibility of school administration.

IAS can terminate support to any school or schools on the following grounds • When the donor agencies cease to fund the project. • When the budget is exhausted. • If there is misappropriation of funds or school materials supplied. • Security reasons. • For any other reason deemed serious enough in accordance with our memorandum of understanding or terms of partnership. • The above will also affect any school on any phase of renovation.

Assumptions and risks • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project and that the community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitudes and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy, in particular to female education.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 14

HEALTH

Introduction In the Millennium Development Goals (MDGs), three out of eight goals, eight of the 16 targets and 18 of the 48 indicators relate directly to health which is also an important contributor to several other goals. These goals form an important benchmark in determining minimum standards for the provision of relief and development aid. Regrettably, the situations of conflict and disasters in which relief and development work is undertaken have a negative impact in the achievement of the MDGs. The destruction of facilities, systems and institutions affect the delivery of healthcare. Conflict also results in physical, emotional and mental trauma, immigration and transmigration, spread of diseases and malnutrition among other ills with all their attendant implications on the health of the affected persons. These make the dream of health for all continue to be nothing but a mirage in the desert.

Objectives Goal The IAS health sector hopes to contribute towards the achievement of “health for all” in the communities where IAS is operating. Purpose To promote wholesome living in the beneficiary communities so as to realize the personal and social political and economic ideals cherished therein. Outputs The IAS health programme provides Primary Health Care services in beneficiary community. The package provides integrated, accessible health care services by health workers and clinicians who are accountable for addressing a large majority of personal health care needs, developing a sustained partnership with patients, and practicing in the context of family and community. Promotion of health and self care are core components of this approach.

Activities and ways of Implementation The Primary Health Care approach necessarily focuses on preventive measures of promoting health. Consequently, the activities in the IAS programme are informed by this in method and implementation. They fall under three broad categories namely; Promotional, Operational and Capacity enhancement. Promotional activities • Community Health Education. • Awareness raising and advocacy through appropriate multimedia. • Community mobilization including the formation of community health committees. • Extended programme on immunization in conjunction with partners and other authorities. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 15



Coordination and information sharing with other actors at various forums.

Operational activities • Delivery of out patient medical services. • Maternal and Child Health services. • Horizontally integrated programmes such as TB, leprosy HIV/AIDS etc. • Out sourcing and provision of technical support for common problems such as eye cataract. • Case management and referral procedures. Capacity enhancement activities • Training of health workers. • Health Information System Management. • Formation and training of community health committees. • Provision of essential drug supplies tools and equipments. • Improvement of basic facilities at medical centres.

Assumptions and risks • • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitudes and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 16

WATER AND SANITATION

Introduction The following document outlines IAS water and sanitation policy for its donors, partners and staff. The water and sanitation policy serves to create and promote an understanding on the IAS water and sanitation sector with emphasis on the activities undertaken and approaches used; promote an inter-sector understanding within the organisation on the water and sanitation sector objectives and to promote sound implementation of water resource management within the sector. The IAS water and sanitation sector and its related activities seek to contribute to meeting the standards related to access to water in accordance with the Sphere project (Humanitarian Charter and Minimum Standards in Disaster Response) and the United Nations Millennium Development Goals.

Objectives Goal The goal of the IAS water and sanitation sector is increase access to safe water and, in connection to safe water, the provision of appropriate sanitary facilities. Purpose The purpose of this policy is three fold: 1. Improve the quality of life by providing access to safe potable water and appropriate sanitary facilities. 2. Reduce the incidence of water borne diseases. 3. Develop a sustainable water point maintenance strategy for both old and new water points. Outputs The main results expected from the interventions are: • • • • •

Healthier populations due to increased access to, and consumption of safe water and proper use of available sanitary facilities. Reduction in time and energy spent obtaining water due to better and nearer water delivery systems. Improved livelihood capacities due to increased productive capacities for the community to meet basic needs and generate income for themselves. Improved hygiene and sanitation practices among the beneficiary community. Improved capacities of the beneficiary community to maintain and repair water points.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 17

Activities and ways of implementation Activities At the onset of the project activities, participatory situational analysis is carried out in the proposed project area to ascertain among others the following: number of water points/ sources; number of beneficiaries; hydro-geological surveys to determine the water; the ground water and recharge levels. Apart from the initial situation analysis, the following are the other activities involved in this sector: • • • • •

Drilling of deep boreholes and installation of hand pumps. Spring protection. In-service training for hand pump technicians. Construction of latrines. Construction of shallow wells.

Approaches Community-based The water and sanitation interventions are undertaken through a community centered approach considered instrumental in not only increasing the community participation and ownership of the water points but also in enhancing local sustainability mechanisms of the project. From the onset of the project, the organisation seeks consultative meetings with the community to discuss allocation of water points and sanitary facilities, and to define the roles and responsibilities of the community and IAS as an implementing organisation. Training and capacity building The service delivery component is complimented with training on two levels. Firstly, the organisation conducts general hygiene education and sanitation. This is done through community workshops and seminars addressing issues related to proper use of water; especially handling of water containers and cleanliness at the water source and in the home. Secondly, community based hand pump technicians are trained on operation and maintenance of water points. Inter-agency cooperation In order to enhance the impact of the water and sanitation sector, the organisation seeks to create and work within linkages and partnerships, where relevant and possible with other actors both national and international organisations involved in water and sanitation.

Assumptions and risks The progress and impact of the water and sanitation policy and sector interventions will depend on the following risks and assumptions: • • • • •

Climatic conditions and ground water potential are favourable for the implementation of the project activities. Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of good hygiene and sanitation practices. The organisation is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 18

• • • • • •

There is coherence between the organisations project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. There is synergy between the organisation, local authorities and line ministries in relation to spare parts procurement and delivery. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 19

CRITERIA FOR STARTING A PROJECT

Introduction From its vast experience as a Relief and Development organisation, IAS deems it fit that certain strategies for initiating a project in order to utilize the maximum of every specific intervention are a vital tool. This policy will serve as a guideline, in the light of IAS mission statement, to what circumstances that should be taken into account when starting a project.

Objectives Goal The goal is to provide a foundation for better run projects. Purpose The purpose is to utilize the maximum of every project in order for IAS to best serve the people benefiting from the project. Outputs Projects that are more carefully planned and therefore are implemented in a more efficient and professional manner serving in the best possible way the community amongst which IAS works.

Activities and ways of implementation The following points are to be considered before starting a project: • • • • • • • •

Humanitarian concern; In accordance with IAS vision and mission statement as well as ICRC code of conduct, the humanitarian concern is imperative when initiating aid projects. Need; No project should be started unless there is a clear identified need for assistance by IAS. One of IAS targets is also to provide assistance to the forgotten and lost people getting deprived of aid from elsewhere – to reach out to the un-reached. Holistic view Geographical focus; IAS will give priority to projects that are within the geographical focus of the organisation. Sector focus; IAS will give priority to projects that are within the sectors of the organisation. Local partners; IAS strongly believe that, in order to achieve sustainable projects, local partners and stakeholders must be involved from the very first step of the project. Capacity of organisation and local partner; this include the following; financial resources, personnel resources, knowledge and experience as well as administrative and logistics capacity. A clear exit strategy, in line with IAS Exit Strategy Policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 20

Assumptions and risks • • • • • • •

Adequate funding for the proposed intervention. Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the project objectives. Sustained security access to and within the project areas is assured. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 21

CRITERIA FOR CLOSING A PROJECT

Introduction The intensive focus of resources on an area for a limited period of time is expected to catalyze self-sustaining development, but reality shows that this is often not the case. There are several different circumstances that can serve as criteria for closing a project, some are forced by external unwilling circumstances and others are a natural part of every project. This policy will serve as a guideline to what criteria should be achieved or can be justified for closing a project. The policy will in most cases reflect what is outlined in IAS policy “Criteria for starting a project” and is intended to be implemented together with IAS “Exit strategy policy”.

Objectives Goal The goal is to provide a foundation for closing projects in the most appropriate way. Purpose The purpose is to utilize the maximum of every project in order for IAS to best serve the people benefiting from the project. Outputs The results that should be achieved are projects that are closed in the most appropriate and best possible way causing the least harm to the community in which IAS is working.

Activities and ways of implementation As mentioned in the introduction, some circumstances force a closure of a project while other circumstances form a natural end of the project. The points mentioned below are criteria that should be achieved or can justify a closure of a project. •

• • • •

Project objectives accomplished; this is the most wanted outcome of any project and will form a natural end to a successful project. This will include a correct implementation of IAS exit strategy policy meaning that the project is self sustaining due to the involvement of local stakeholders. Needs, geographical and/or sector focus changed; what used to be needs have become resources. This can be both material and human. Security situation deteriorating; in the event of risk of life for staff and the communities. Changed donor focus; the donor community is need driven and therefore might shift its focus to other geographical areas. Lack of continued funding.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 22

Assumptions and risks • • • • • •

The project objectives have been accomplished. Changed donor focus. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community has accepted and adapted to knowledge, attitude and practice of the project objectives. Sustained security access to and within the project areas is assured. . Cultural acceptance of the project has been achieved.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 23

EXIT STRATEGY

Introduction The transition from acute emergency to sustainability affects all stakeholders - local people, the employees, civil authorities, community leaders etc. IAS realizes that the intensive focus of resources on an area for a limited period of time is expected to catalyze self-sustaining development but the reality is that there are no quick fixes. IAS also realizes that development is a continuing process and that it is important to maintain that continuity. It is also important to note that when an aid programme comes to an end, there may be tasks left to do as community expectations may not have been satisfied. Getting into an area is often easier than getting out. Reminding oneself why the programme was developed in the first place and what the programme was designed to achieve is the key factor that will help one focus to the exit of a project. This Exit Strategy will ensure that maintenance and utilization for all investment that has been made in the area is secured and planned for.

Objectives Goal The goal is to ensure the sustainability of impacts after a programme ends. Purpose The purpose is to improve the chance of sustainable outcomes of the programme. Outputs The result should be sustainable programmes that can continue even when IAS has ended the programme.

Activities and ways of implementation There are three basic approaches to exit strategies. They are: 1. Phasing down 2. Phasing over 3. Phasing out Phasing down is a gradual reduction of programme activities and is often a preliminary stage to phasing over and/or phasing out. Phasing over is when a sponsor or agency transfers its programme activities to local institutions or communities. Phasing out is when a sponsor or agency withdraws completely without turning it over to any local institution for continued implementation. IAS believes in the importance of continued sustainability and therefore all programmes should have as an aim to phase down and phase over, not phase out.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 24

Exit criteria When is the exit point? Aid programmes should be limited to a specific period of time and should have a known end date. Ideally the programme would be phased over a period of time; different projects within the programme would have different exit points according to the achievement of predetermined objectives. In a time-bound programme there should still be set targets. These would be regularly monitored and evaluated, so that the organisation can predict what is being handed over. When should you plan to exit? Plans for exit should be at the start of the programme. IAS will not wait until the end is in sight. As the aid programme develops, every individual project should incorporate an exit strategy into its development. IAS shall beware of projects requiring continuous funding to keep running. Donors may not want to fund such projects after the end of the programme unless the donors are willing to support a local NGO or institution that IAS will be handing over to. Who should be involved in the process? IAS will involve all stakeholders; the recipients of aid (beneficiaries), project partners etc. IAS will also involve the main organisations and bodies such as civil authorities or municipality departments that will continue to have a management or maintenance function. Those responsible for looking after individual projects when the aid programme is completed will also be involved - these may be interim successors or local organisations. What needs to remain in the area? A problem that might arise when exiting a programme is that the momentum can easily get lost, despite the best intentions of the organisation for taking on the activities. IAS must ensure that there is focus within the area for development e.g. a community organisation, which can monitor continuous improvement. How will IAS prevent a recurrence of the original problems? IAS realizes that there are no easy answers to this question, especially in chronic complex emergencies or natural disasters when causes of the crisis are beyond control. However, below are some basic points to consider: • • •

The initial needs assessment; the regular programme monitoring and final evaluation should form the basis of a few indicators. These should be agreed upon by all, easy to measure and should be regularly checked to monitor progress. IAS should encourage the local authorities and the local organisation to plan to meet on a regular basis to review the results of the monitoring. Further deterioration in any of the indicators may lead to the need for further intervention. “IAS should develop a mechanism that this does not happen.”

Handover process IAS is to make sure that the handover is done formally, so that all the stakeholders are aware when it takes place and the commitments, which new people are entering into, or recommitments by existing partners can be acknowledged. In the areas where IAS has worked for a long time, the point of exit is a "Rite of Passage" and needs to be marked with celebratory events within the community. Much as exit is never wanted, it should end in style. Checklist of other vital points to consider before exit IAS realizes that there is no standard pattern while planning to exit. Each activity or project should be reviewed to consider what should happen to it after the aid programme is finished. Below is a checklist that IAS will use to exit. •

IAS will ensure that competent officers to handle the exit activity are in place.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 25

• • • • • • • • • •

There should be a local NGO or agency e.g. the municipality or a community organisation to which the project should be transferred. The process on how the activity be transferred must be in place. All performance specifications to be maintained must be clarified. If the project is to be funded when handed over, such will be clarified by IAS. IAS must have a mechanism on how the project will be monitored. The role of the community in managing or monitoring must also be clarified. If need be IAS must clarify how the community’s role will be supported. IAS must ensure that the role of the local authorities is clearly stipulated out. IAS officers on the ground must know whether the successor organisations or persons need any training. IAS must have on record such assets as need to be retained by the organisation and which ones can be transferred to the successor?

Assumptions and risks • • • • • • • • • • •

Funding problems; the project/funding cycle can force an exit even when IAS is not ready to handover the programme. Uncertainty of continued donor support can cause considerable constraints on IAS as an organisation, IAS staff and the local stakeholders. Political instability. Lack of local stakeholders to take over the responsibility of the programme. Limited follow-up capacity. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Need for training among IAS staff in order to make clear exit strategies a natural part of all programme planning and implementation. Inter-agency partnership and the existence of coherence between the organisation, IAS´, project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the Exit Strategy goals and purpose. Sustained security access to and within the project areas is assured. Cultural acceptance of the project has been achieved.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 26

EMERGENCY RESPONSE

Introduction Despite efforts to reduce the risk of disasters of various kinds, such as famine, drought, earthquakes, floods and acts of war, they continue to affect human lives all over the world. Lack of planning for such catastrophes or the breakdown of normal coping mechanisms has caused increased suffering for the people who are affected. Within the context of IAS work it is imperative that mechanisms be put in place to help guide IAS response to disasters, especially in communities among whom IAS is already working.

Objectives Goal The primary goal of emergency response is to minimize the effects of a disaster on a population through the delivery of appropriate emergency relief services and materials in a timely and efficient manner. Purpose The purpose of all emergency response is to improve the quality of life for the beneficiary to the level that was status quo before the disastrous event occurred. Outputs Appropriate delivered emergency relief services in order to improve the quality of life for the beneficiaries.

Activities and ways of implementation In order for IAS to make the best impact it should focus on the activities that are the strength of the organisation and the type of activities that is best suitable for an emergency response. Lessons shall be taken from previous interventions and experiences. Local governmental authorities should always be informed of any planned intervention, preferably prior to the actual implementation. Regardless of sector, the emergency response must, in order to achieve substantial sustainability, involve the beneficiaries in the implementation. IAS also believes that emergency response must work towards preparedness, why mechanisms must be set in place to decrease a community’s vulnerability to a disaster and to help communities prepare for the unforeseen and unexpected. The intervention shall also raise community awareness and public education about possible future hazards and vulnerabilities for people living in high-risk communities as well as provide knowledge of basic coping strategies that can minimize the loss of life and property. Finally, special attention must be given to the more vulnerable and marginalized in the response. Such people include unaccompanied minors, the elderly, mentally

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 27

challenged/handicapped, victims of physical abuse and violence, and pregnant or lactating women.

Assumptions and risks • • • •

• •

Adequate funding for emergency and disaster response must be secured. Special consideration shall be taken to the political stability in the area of operation. IAS upholds the right to stop any activities when security measures so require. IAS will, based on the knowledge obtained by previous emergency interventions, continuously improve the emergency response mechanism. Improved mechanism for disaster preparedness. Country Representatives and Sector Heads will be more equipped with material about possible negative future scenarios based on reports from the field where IAS operates and other relevant reports, such as FEWS – Famine Early Warning Systems. IAS must be prepared to respond to disasters and catastrophes that might occur to the people it’s working among. For future purposes, IAS will ensure that all IAS projects have a component where sustainability, disaster mitigation and reduction are included. In some cases, the help provided will result in a better state for the beneficiary than previous state. If that is the case, it is a welcome output but does not have to be the aim for the intervention.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 28

ENVIRONMENT

Introduction Man is completely dependant on nature for existence and survival. On the other hand the situation for the environment is very alarming as a result of an increasing degree of pollution. This is due to short-term use of natural resources, lack of knowledge about the environment and lack of willingness to act in an environmental way. In view of the above, IAS has an active and self-critical way of using the environment resources. There is a clear link between environmental degradation and poverty. Poor people are more dependent on renewable natural resources than others. The pollution of the environment is classed as one of the reasons why poverty is on the increase and not decreasing in the world. The poor have few resources and are forced to live on very limited geographical areas. It is therefore high risk that the eco system is exhausted. The livelihood of the rural poor is extremely dependent on the fragile environmental resource-base that the poor are often compelled to inhabit. Further degradation and depletion of the nature in their local community will invariably worsen the lot of the poor. An aggravation of poverty, in turn, will compel the poor to make use of the marginal natural resources at their disposal in a way that may not be sustainable. IAS is closely following the international discussions and signing of conventions relating to environmental issues. The use and the management of natural resources by the present generation must not take place at the expense of future generations. There is no doubt that the present generation must take serious action if a sustainable development for future generations will be achieved.

Objectives Goal The overall goal is for IAS interventions to be as beneficial to the environment as possible. Purpose The purpose of this policy is to protect the environment through taking precautions in minimizing the harmful effects that a humanitarian programme might cause on the environment, working towards upholding a sustainable environmental future for generations to come. Outputs The outputs that can be expected through this policy are increased awareness of the importance of including environmental aspects in planning and implementing humanitarian interventions, and minimized harmful effects on the surrounding environment.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 29

Activities and ways of implementation IAS will include the environmental aspects in all sectors from the planning stage to the actual implementation of the programmes. This will include the following: • • • • •

IAS will give priority to interventions that contribute towards use of alternative energy resources. IAS will strengthen its education programme by ensuring that environmental issues are included in all curriculum at all training workshops on all levels. IAS will conduct training for its personnel in environmental related issues. IAS will carefully study and examine the link between interventions addressing poverty reduction and how poverty affects the environment. IAS will use an environmental analysis on all proposed projects.

Check list IAS will also have a check list of points to be considered before commencing the actual implementation of a programme: • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

How will the proposed project have consequences for the environment? Effects, such as pollution, on soil, water and air. Cause possible erosion. Overgrazing or overuse of the soil, resulting in destruction. Lowering of the groundwater. Increase or decrease of carbon dioxide. Are the environmental issues properly taken into consideration before refugee camps and camps for displaced people are planned? Analysis of water quality. What are the provisions for future availability of fuel wood and wood for construction? Biological consequences. Will sensitive eco-systems be negatively affected? Risk for the spread of diseases on plants or animals. Threats on the biological variety? Effects on human beings. Risk for the spread of diseases on human beings. Will the living standard of the national population including nomadic population get better or worse? Will the project change traditional behaviour negatively? Risk for conflicts between people groups. Are traditional or religious sites protected and respected? Are personnel and beneficiaries, including teachers and medical personnel, given necessary education about environmental issues and its effect on health? Chemical consequences. Are dangerous chemicals used that will have future negative consequences? Are the personnel well informed about the handling procedures of dangerous chemicals? Will the chemicals affect those who handle them and/or the population at large? Procurement/Logistics. Are the transports well planned to avoid unnecessary movement of vehicles and material? Are all inputs including food culturally accepted? Can packing material be used for other future purposes? Energy. Are energy saving stoves and cooking utensils used? Are there provisions of re-forestation in areas where fuel wood is used for cooking? Have other energy sources, such as sun and wind, been considered?

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 30

Assumptions and risks • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project. The community is able to accept and adapt to knowledge, attitude and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 31

ETHICS AND INTEGRITY

Introduction Ultimately, the struggle against corruption will entirely depend upon the morality of all the employees of IAS; which stipulates that the employees’ egoistic interests do not come before those of the communities they serve. We can take all kinds of preventive measures and they can be broken down and subverted. But if the moral fibre of IAS staff in the delivery of services is high, then no amount of corruption can subvert the organisation’s preventive measures. If we are honest and open in our everyday dealings and communication with other people, if we fulfil our commitment at all times and practice trust, tolerance and respect, only then can we achieve dignity and integrity.

Objectives Goal/purpose The goal and purpose of this policy is to eradicate all forms of corruption, fraud, theft, maladministration or suspected irregularities of this nature involving the following: • • • • •

All IAS Employees. Suppliers. Contractors. Consultants. And any other providers of goods and services to IAS.

Outputs The results attained should be achieved dignity and integrity by being a truly honest and transparent organisation which fulfils the commitment of practice trust, tolerance and respect.

Activities and ways of implementation It is the policy of IAS that corruption, theft, fraud, maladministration or any other acts of dishonesty of a similar nature will not be tolerated. It is the responsibility of the persons mentioned above to report all incidents of corruption, fraud, theft, maladministration in their countries, sectors or area of operation. All IAS Staff in Senior Management level are responsible for the detection and prevention of all corruption, theft, fraud and maladministration. Actions instituting corruption, fraud, theft and/or maladministration • Any dishonest, fraudulent or corrupt act. • Theft of funds, supplies or other assets. • Financial misconduct in handling or reporting of money, financial transactions or other assets. • Disclosing confidential information to outside parties. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 32

• • •

Irregularly accepting, requesting, offering or giving anything of material value to or from contractors, suppliers or other persons supplying services/goods to IAS. Irregular destruction, removal or abuse of office records, furniture and equipment. Deliberate omitting or refusal to report or act upon reports of any such irregular or dishonest conduct or any similar irregularity.

Protection of whistle blowers Any employee/official who suspects or reports suspected dishonest activity or any such activity that he/she has witnessed, may remain anonymous if he/she so requires. Allegations made by employees/officials which allegations are false and made with malicious intents, should be discouraged by IAS Senior management. Where such malicious or false allegations are discovered, the person who made the false allegations should be subjected to firm disciplinary action. There will be no reprisal against an employee/official who in good faith reported a violation or a suspected violation. The IAS Code of Conduct • IAS assumes that the employee lives a moral life that can be examined and serves as an example to colleagues and the environment. • The code is intended to be a guide for staff in sustaining behaviour in their professional and private life which is in line with IAS ethical principals and guidelines. • The Code is intended to help the employee to better understand the special obligations he /she has as a humanitarian worker in assisting vulnerable individuals or groups of people. • By accepting employment with IAS all employees shall know and accept the special duty of a humanitarian worker and the ethical conduct that goes with their responsibility. • Any senior manager must acknowledge their special duty to personally set a good example and maintain the IAS ethical working environment in which their colleagues can sustain an ethical behaviour fulfilling their duties. • IAS is a drug free working environment. It is dangerous and unlawful to manufacture, distribute, dispense posses or use any kind of drugs. • IAS shall maintain the basic ethics of integrity, stewardship, transparency, accountability, diligence, fairness etc. These ethical standards shall be expected of all IAS employees and volunteers. • IAS´ values like, truthfulness, honesty, transparency, respect for humanity as created in Gods image, shall be the bottom line in maintaining linkages and networking with other organisations. • IAS expects every employee to initiate and maintain cooperation and teamwork with colleagues and other partners. • The employee shall acknowledge, respect and show sensibility to local culture and traditions as long as these are not in conflict with the Christian morals and standards. • The employee shall not sexually harass their colleagues and locals, or in any other way live in a way which is shamefully and not in accordance with Christian morals. • Every employee shall respect, submit and obey their superiors, be it at the workplace or in the organisation as a whole. • The employees shall promote human rights of all regardless of social status, race, ethnicity, colour, religion, gender or age. • Never commit any act or harassment that could lead to physical or physiological harm, especially to women and children.

Assumptions and risks • •

Sustained donor funding. Highly committed IAS staff.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 33

GENDER

Introduction International Aid Services humanitarian mandate is to prevent and alleviate suffering without discrimination as expressed in the IAS Mission Statement. Gender equality ensures that there is no sex-based discrimination in the allocation of resources, benefits or in access to services. Gender refers to the roles, responsibilities, needs, interests and capacities of both men and women as opposed to looking at the special interests and needs of women alone. Male and female roles, responsibilities, needs, interests and capacities are influenced by social and cultural factors. It is important to understand that men and women play different roles in society and that gender does not mean that men and women should necessarily change their behaviour and execute the other’s duties. IAS believes that the gender issue must be looked at in a broader context where the different needs of men and women are distinctively addressed.

Objectives Goal The goal of this policy is to make gender-related issues a part of every intervention from the planning stage to the implementation, in order to make sure that both men and women equally benefit from an intervention. Purpose The purpose is to understand the underlying causes that contribute to an unjust balance between men and women when it comes to relief and development interventions. Natural disasters, conflicts, social and political instability affect men and women differently, and by understanding these differences it will be possible to meet the needs of both men and women accordingly. All people should have access to humanitarian aid, regardless of sex, age or race. Outputs Sufficient balance between the needs of men and women addressed in all IAS interventions.

Activities and ways of implementation • • • •

IAS will ensure that the needs of boys and girls, men and women are met accordingly in all interventions. IAS realizes the importance of having to be extremely sensitive to culture and religion. Gender issues must be addressed contextually. IAS believes in the importance of having full participation of men and women in its programmes. This will not only strengthen gender balance but also make the programmes more efficient. IAS will continue supporting women development initiatives. Project proposals for women programmes will be considered on the same level as other proposals.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 34



• •

IAS will continue to encourage girls’ education and take measures through its Integrated Community Empowerment Programme (ICEP) to educate all parties concerned about the importance of girls’ education. IAS is aware that the consequences of girls’ education in some societies will drastically change traditional systems and therefore will take precaution to approach in a non-offensive way. IAS will continue addressing the needs of women and children specifically in armed conflicts. This includes involving women in conflict resolution and negotiations. IAS will continue to lay emphasis on the importance of maintaining its status as nondiscrimination and serve as a model for partner organisations and individuals. Gender therefore plays an important role in capacity building as well as institutional development programmes.

Assumptions and risks • • • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy. Men and women benefiting equally from IAS interventions.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 35

HIV/AIDS

Introduction In the first 20 years of its known existence, the HIV/AIDS virus (Human Immuno-Deficiency Virus/Acquired Immune Deficiency Syndrome) has been essentially considered as a long term development problem due to implied costs and timeframe, and also for reasons of political sensitivity. More than 23 million people have been killed by the virus and the World Health Organisation body (WHO) in October 2003 declared HIV/AIDS to be a global health emergency. IAS is working in some of the most affected nations and feels the need to make its own contribution towards eliminating the outbreak of further HIV/AIDS. Studies also indicate that HIV/AIDS needs to be considered across the full spectrum of the sustainable livelihood framework, which IAS intends to do.

Objectives Goal The overall goal is for IAS to make HIV/AIDS related issues a natural and vital part of every intervention. This is in order to reduce the spread of HIV/AIDS and to encourage/enable already affected victims to go on with life. Purpose The purpose is to reduce the possibilities of further HIV/AIDS outbreaks among the beneficiaries in the areas of IAS operations, all in accordance with IAS mandate to save and promote life. Outputs Results to be achieved are a noticeable decrease in the spread of HIV/AIDS related cases among the beneficiaries and more consideration for HIV/AIDS issues in all IAS interventions.

Activities and ways of implementation IAS will have most of the activities in its operations focusing on making HIV/AIDS a cross cutting issue in the already existing programmes in all relevant sectors. IAS will also ensure that HIV/AIDS considerations will be included in all programme planning, carried out through the actual implementation and be a sustainable component after IAS phase-out. The key elements of our policy are: • The provision of information to employees on HIV/AIDS, its magnitude, impact ad preventative measures. • Implementation of non-discriminatory policies, procedures and practices in managing individuals who have HIV/AIDS.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 36

• • • • • • • • • •

To approach individuals who have HIV/AIDS in the same manner as those with any other progressive or debilitating illness. To join forces with other organisations to counter HIV/AIDS and alleviate its impact by sharing the results of our internal research and supporting their efforts where appropriate. Increasing focus on women and strengthening the linkages between gender equality, sexual and reproductive health and HIV/AIDS programmes. Increasing focus on the synergies between HIV prevention and treatment. Increasing focus on young people and on children orphaned or made vulnerable by HIV/AIDS. Strengthening the involvement of the civil society in the planning and implementation of the HIV/AIDS response. Support the promotion of HIV prevention initiatives in primary and secondary schools. Support interventions aimed at ensuring that orphans and other vulnerable children remain in the education system. Support community mobilization and capacity building to mitigate the effects of HIV and AIDS on orphans and vulnerable children. Fighting stigma and discrimination.

HIV/AIDS and conflicts HIV/AIDS is both a long-term crisis in its own right and a contributory factor in acute emergencies. HIV/AIDS is one of many factors contributing to food insecurity. It is important to understand how the impact of HIV/AIDS relates to other factors, such as drought and conflict, to create acute humanitarian crises. Tackling the wider implications of the HIV/AIDS epidemic on the security situation in the highly affected countries among refugees and internally displaced people and among uniformed services and peacekeepers is an important element in the fight against HIV/AIDS. Conflicts and other emergency situations create conditions such as increased vulnerability of women and girls, collapse of health systems, break down of traditional sexual norms etc. that increase the risk of contracting HIV-infection and may lead to the further spread of the infection. In view of the above IAS will deploy the following below to try to reduce the rate of infection of HIV/AIDS. Specific activities during programme implementation include: • Designing safe environments in the activities in order to minimize risks of rape for women and minors. • Include HIV/AIDS education in all IAS programmes, i.e. holding courses/seminars at schools targeting HIV/AIDS related issues. • Training of IAS staff in HIV/AIDS. • Close collaboration with other partners in HIV/AIDS related matters. • Care for victims and the sick.

Assumptions and risks • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 37

• • • • • •

Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy, in particular when it comes to HIV/AIDS related matters such as family planning etc. IAS interventions creating a positive effect on the eradication of HIV/AIDS virus.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 38

INTEGRATED COMMUNITY EMPOWERMENT PROGRAMME

Introduction and background For many years IAS has used the Integrated Community Empowerment Programme (ICEP) to address issues related to community ownership of IAS supported projects and has recorded little success. Much of the reason behind this has been that IAS, as well as other international agencies have been focused mainly on the emergency type of intervention in the many countries/areas of operation. Unfortunately, the relief oriented type of intervention, whose objective is to quickly intervene in emergencies, does not take community development and ownership related issues into account during the implementation process. Furthermore, the relief oriented type of intervention does not take project sustainability into account either. This resulted in the creation of a “dependency syndrome” among beneficiary communities in many areas of IAS operation. In addition to the problem of dependency, minimal co-ordination between the different sectors of IAS intervention led to diminished impact in beneficiary communities. IAS’ intervention is through the sectors of Water and Sanitation, Education, Agriculture, Christian Ministries and Health. There are many occasions where the above sectors worked independent of each other. And so with time the need for concerted, integrated efforts among the sectors became very apparent especially when one thinks about bringing a holistic and sustainable intervention. In many countries/areas of IAS operation the situation is characterized as an emergency by any standards. However many parts of those countries/areas are more stable than others and therefore offer an opportunity for alternative means of international agency intervention. In the more stable parts of those countries/areas, IAS would evaluate its ways of operation and begin to adopt methods of intervention that would facilitate sustained development. This is easily affected using the Integrated Community Empowerment Programme (ICEP) tool. The ICEP tool is to encourage a unified approach among sectors during the planning and implementation of projects. Furthermore, the programme should encourage community participation and ownership from the outset of any project with all the IAS sectors having input, bringing about holistic development. Using the Integrated Community Empowerment Programme IAS is to work among beneficiary communities in a much more coordinated, holistic and concerted manner. What is Integrated Community Empowerment Programme? The Integrated Community Empowerment Programme was established to incorporate all IAS activities in the sectors of Water and Sanitation, Health, Agriculture, Education and Christian Ministries so as to address jointly the issue of joint community dependency. The programme aims at motivating positive community behavioural change towards project ownership, dignity, participation, sustainability and self-reliance. It was developed as a means to help bridge this gap in IAS implementation policies. The programme also draws heavily on experience gathered over the years and bases a lot of future implementation on the results of an evaluation process. Through integration and empowerment of communities, this programme is deemed to bring about the restoration of dignity and self-confidence.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 39

Objectives Goal In line with the overall mandate of IAS, the overall goal of ICEP is to promote sustainable community based programmes in all IAS' served areas regardless of race, creed, gender or nationality of the recipient. This will be done by strengthening the capacity of the communities through training, which will increasing their sense of ownership of the projects. Purpose The purposes of this policy are: • • • • • • • •

To encourage and strengthen community participation in the planning and implementation of projects through dialogue, community mobilization, and sensitization meetings, all done in an effort to bring about an increased sense of ownership of projects. To identify and prioritize community needs using a problem tree, after which intervention measures will be coordinated with all key players. To build the capacity of given communities through workshops and seminars on the identified needs. To identify and empower vulnerable groups through training, workshops and seminars enabling them to become self reliant e.g. the disabled, widows and orphans. To help improve household economies, by supporting emerging income generating activities with materials and training. To encourage a change of attitude within given communities on gender related issues through mobilization, sensitization and training. To train IAS programme/field staff in data collection techniques who will then use these techniques, together with pre-defined indicators, to carry out continuous monitoring and evaluation of all IAS programmes. Encourage the development of inter- and intra-sectoral collaboration within IAS and with all international and indigenous agency partners.

Outputs The result should be sustainable programmes by integrating and empowering the communities which are benefiting from the programme.

Activities and ways of implementation The Approaches of ICEP The programme opts to encourage and strengthen the communities to adopt sustainable practices. Through the programme IAS staff will endeavour to work with communities and learn from them what they know, what the communities do and what they want to do. IAS staff will also endeavour to offer concrete ideas about participatory development and effective communication as well as help communities put these concrete ideas together to plan an effective empowerment promotion programme. At the same time the programme is to target individuals and bodies involved directly or indirectly in the empowerment of communities. These include: • • •

Local leaders, government officials and other organized groups. Community based organisations, other NGOs and implementing agencies. Water technicians, agricultural extension workers, health promoters, PTAs, and BOGs.

It will be through such as the above that the capacity for sustainable and continuous empowerment will be sought.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 40

The Stages of ICEP The programme will be implemented in the following stages: • • • •

Planning of the local strategic implementation framework. Identification and analysis of dependency practices and to target these practices for positive change. Motivating stakeholders' positive behavioural change towards ownership, dignity, participation, sustainability and self-reliance. Implementation and effective communication of the programme.

ICEP Functions The programme management committee will be comprised of a community development officer, an administrator, a sector head, a programme support officer and a field coordinator. The management committee will meet regularly and oversee the integration and implementation of the programme. All the sectors will have an opportunity to have an input in the communities that IAS is involved in hence synergistically encourage lasting change in the communities IAS staff through this programme will use the available means at their disposal to enter the communities in the most effective way. These will include civil and local authority channels, churches and other influential groups within the communities. These structures will be crucial in the mobilisation and eventual sensitisation of the communities IAS hopes to reach. The programme will aim at having a "bottom-up" participatory approach in all the communities that IAS is involved in. Each of the sectors will lay down its strategies to meet the identified needs within the communities and the core committees will co-ordinate their implementation. Through a series of workshops and seminars focusing on the training of trainers IAS hopes to initiate change. All activities of the programme will encourage gender sensitivity and the development of all strata of society. ICEP Programme Implementation In order to be more effective in planning and implementation of programmes, establishing a database of baseline information is the first objective of the Integrated Community Empowerment Programme. Then this will be followed by the sensitization and training of all IAS staff including the evaluation and collection of baseline information. The information collected will be analyzed for the creation of a database which later will help in the planning and implementation.

Assumptions and risks • • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the Empowerment programme. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the Integrated Community Empowerment Programme objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the empowerment programme goals and purpose. Sustained security access to and within project areas is assured. Sustained donor funding that allows for project goals to be met. Overall policies for conditions relating to the programme’s objectives adapted by the national government in order for the programme to be in line with the national development. Cultural acceptance of the programme.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 41

PARTNERSHIP – PROGRAMME COUNTRIES

Introduction There are principles that need to be developed in order to have quality partnership in the implementation of projects. With true partnership, efficiency in project implementation is improved. A good partnership also creates trust between beneficiaries and the organisations involved in the projects’ implementation. IAS believes in the 10 following principles of partnership 1. Partners jointly determine objectives, principles, values and criteria related to humanitarian action. Flexibility and equity (non-discrimination) are seen as shared core values. 2. Each partner knows and respects the mandates, charters or statutes of the other. 3. Partners establish a climate of mutual trust and respect. 4. Partners inform and create networks. 5. Partners share responsibilities. 6. Partners promote accountability of the whole system, in particular to the recipients of aid. 7. Partners ensure monitoring and evaluation of the partnership. 8. Partners share successes and failures to develop best practices. 9. Partners promote a learning environment by engaging in the dissemination of experience and best practices. 10. Partners commit to reinforcing the linkages between relief, rehabilitation and development, with the view to help the recipients of humanitarian aid regaining a minimum if not maximum of self-sufficiency.

Objectives Goal The overall goal is to create lasting and trustworthy partnerships for the implementation of humanitarian programmes. Purpose The purpose is to reach out to those in most need/target groups by utilizing the network and trust that the partnership creates. Outputs To create lasting and trustworthy partnerships establishing more efficient means in reaching out to the target group.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 42

Activities and ways of implementation IAS believes in the importance of cooperation and partnership in all interventions. There are three levels of co-operation that IAS will continue to maintain, and where needed, continue to improve: 1. Cross-sectoral collaboration within IAS. 2. Co-operation with the beneficiaries. 3. Co-operation with international and national organisations. Cross-sectoral collaboration within IAS It is very common that each programme sector tends to develop its own strategies independently of other sectors. This sometimes causes unnecessary confusion among the beneficiary communities. A community is in need of health, education, water and sanitation and agricultural support. In the community these sectors are tightly linked together. IAS believes in a holistic approach where all the sectors are integrated and a joint approach is conducted. Although this approach is not always possible, IAS will strive to improve the cross-sectoral collaboration within the different sectors and encourage sector heads to agree on joint policies on programmes targeting the same communities. Co-operation with beneficiaries. To create self-reliance the target group must be involved from day one in the planning and implementation of a project. The project belongs to them and the issue of ownership should be addressed at an early stage. IAS has developed a strategy called ICEP – Integrated Community Empowerment Programme. This document will serve as a guide in all IAS programmes and in IAS’ relationship with the beneficiary communities. In a situation where the local authorities are not amongst the target group, IAS will endeavour to foster such co-operation. Co-operation with International- and national organisations • IAS is a member of several consortiums. No organisation can claim to have enough resources to meet all the needs in a given community. It is therefore imperative to link up with organisations, both international and national, to compliment each other. • IAS will continue to seek ways of channelling support through local indigenous organisations where feasible. IAS recognizes the expertise that is available in these groups. However, it is important to understand that in order for local organisations to effectively operate, the international organisations must build their capacity by providing training and logistics support. • A guiding rule is that IAS will only pay for expenses occurring in the country of operation and not support regional office expenses for local partners.

Assumptions and risks • • • • • •

Willingness of the communities and local authorities to actively endorse the policy. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the policy objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Shared common vision and goals with partner agencies. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the policy goals and purpose.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 43

• •

Overall policies for conditions relating to the policy objectives adapted by the national government in order for the policy to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 44

PEACE BUILDING, RECONCILIATION, DEMOCRACY AND HUMAN RIGHTS

Introduction The message about reconciliation plays an important role. Without reconciliation there will be no peace. Peace is more than a bureaucratic and diplomatic agreement between warring parties. Issues like visions and values are important in peace building processes. Furthermore, reconciliation is the platform for democracy and the principles for human rights. A person who has been reconciled is a person who has been restored. Experience has proved that humanitarian interventions have not been linked to peace building interventions, as should have, resulting in little or no future sustainability. Humanitarian aid only addresses the symptoms and not the root cause of conflicts. Much as it is deemed difficult, the aim should be to stop conflicts before they turn into disasters. As the cost for prevention of conflicts is much less than the cost for delivery of emergency aid there is a great need to further develop Early Warning Systems at all levels. In order to create sustainable solutions in countries with conflicts an analysis of peace and security political aspects of the dynamics in the conflict is essential.

Objectives Goal The goal of this policy is to highlight the importance of peace building, reconciliation, democracy and human rights in the context of a relief- and development programme. Purpose The purpose is to prevent further conflicts by implementing programmes that adhere to seeking the root cause of the conflict and not only address the obviously displayed symptoms. Outputs More attention focused on peace building, reconciliation, democracy and human rights issues when planning and implementing a programme, resulting in the prevention of further possible conflicts.

Activities and ways of implementation General For any organisation it is imperative that the humanitarian principles are adhered to: • • •

Impartiality; humanitarian aid should be delivered without discrimination. Neutrality; humanitarian actors should not favour any of the parties in a conflict. Access; warring parties should guarantee access to people in need and not use humanitarian aid as a weapon.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 45



Responsibilities of the warring parties; the warring parties and other local authorities are responsible and should see to it that all parties concerned adhere to the basic principles of delivery of humanitarian aid.

Role of IAS IAS will seek to prioritize interventions that lead to improvements of the conditions of marginalized people groups and prioritize interventions addressing: • • • • • • • • • • • • • •

Civic Education at all levels. Trauma Counselling. Grass root Peace and Reconciliation. The support to local institutions or organisations that promote peace building and reconciliation. The support to disabled persons as per the United Nations declaration on rights for people with disability. The support to discriminated ethnic groups as per the United Nations convention on rights for indigenous people groups. The support to minorities as per articles 18-20 in the General declaration of human rights. The increased understanding among its staff, project beneficiaries and local authorities about the conflict preventive role of human rights conventions. Strengthening people’s identity, self-esteem and dignity in order to create a platform for democracy as per the IAS mission statement. Encouraging partner organisations to develop democratic decision making structures and methods. In countries where war or ethnic conflicts exist, the focus on interventions that promote peace building and reconciliation. All projects that enhance reconciliation. The rights of the children in armed conflicts. The learning from, and co-operation with, other organisations that have experience in human rights, democracy development, and peace building and reconciliation activities.

Check list Questions to be asked in all interventions: • • • • • •

Will certain individuals or groups be discriminated as a result of the intervention? How can negative effects be minimized or eliminated? How are target groups or partner organisations involved in the planning, implementation and evaluation of the intervention? How can the target groups’ involvement be strengthened? How can components in the intervention that encourage development of democracy and public involvement be strengthened? Will the intervention affect the relationship between warring parties? How will the intervention encourage peace and reconciliation? How can these components be strengthened?

Assumptions and risks • • •

Willingness of the communities and local authorities to actively endorse and take part in the policy implementation process. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the policy objectives.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 46

• • • • • •

The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the policy goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the policy goal to be met. Overall policies for conditions relating to the policy objectives adapted by the national government in order for the policy to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 47

POST TRAUMATIC STRESS TRAINING

Introduction The world today is full of monuments to conflicts that have affected different countries from time to time. Destroyed schools, hospitals, homes and entire cities are telling testimonies to the bitter conflicts that the world has seen. No sooner is one conflict resolved than another starts. Fuelled by all manner of reasons from ideological differences to competition for scarce resources, conflicts continue to have serious impacts on world civilizations today. Whatever their motivation, conflicts have a common and invariable outcome in the destruction of human life and underdevelopment. The most visible part of a conflict is the polarized struggle between a mass of opponents. The protagonists in the conflict engage in protracted talks towards peaceful resolution while the international community focuses on rebuilding the broken economies and social institutions through relief and development aid. The nature of conflicts has changed dramatically in the last few decades. Positive values that have been carried even through conflicts in the past are no longer adhered to. Women and children are today as much victims as they are combatants in conflicts. The world today has to deal with cases of outright terrorist attacks. The strain on the lives of peoples is appalling. Vast numbers of people that go through conflicts are not able to adjust to normal life because the conflict has put ugly scars in their lives. They spend the rest of their lives in this state which consequently affects their productivity as useful members of the society. This also has an impact on the next generations as they become open to abuse from their traumatized parents. And the cycle of violence continues. A fundamental fact is that though every conflict is the result of differences existing between parties, each is started and sustained by individual persons. Each individual sufferer in a conflict setting is also a potential perpetrator. The effects of the same, though affecting entire societies, are also experienced individually. There is need to address the conflict at both levels. There is need to develop policies that support and enhance peace building and also respond to the need of individual persons suffering from the result of conflict. More attention needs to go towards the rebuilding of the broken people in conflicts. The truth is that for every broken building in a conflict setting, several impaired lives are struggling to survive somewhere. Though it is helpful to provide food, clothing and shelter to the victims of conflict, this does not restore their fullness of being. Post traumatic stress training is an essential component of conflict transformation.

Objectives Goal The goals of the post traumatic stress training are: • • •

To provide the avenue for healing of the inner wounds inflicted by war or any other disaster. Build strong interpersonal relationships based on love and mutual trust among all members of the society starting from the family unit. Provide a tool with which individual members of the society can look at their life situation with a new perspective. Participants will have a deeper understanding of their conflict circumstances and how to solve their problems amicably.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 48

• •

Transform participants into powerful agents of change as healers in their strife torn societies. Support conflict transformation by promoting wholesome personal living and peaceful coexistence between communities.

Purpose This policy is designed to promote emotional health of persons that have gone through traumatic stress. This will also raise the standard of living by reducing conflicts at the family and society level. Outputs Emotionally stable and well adjusted persons that make meaningful contribution to their families and community at large. It is also expected that family and society conflicts will be reduced as stress is managed effectively.

Activities and ways of implementation The main implementation strategy is the provision of personalized and group therapy counselling services to traumatized persons. The curriculum consists of a flexible and adaptable content to suit a variety of situations. It is designed to not only enhance healing of individuals that have gone through traumatic stress but also transform them into powerful agents of change. The family unit is targeted as the basis of expected social transformation. The training is offered by teams of trained trainers that will visit various conflict stricken communities assessing the level and degree of trauma in the societies. Three day group therapy counselling sessions will be given in a participatory manner. A few selected trainees that show promise and capacity to reach others will then be given a three-week training of trainer course after which they will also be dispatched to offer more training.

Assumptions and risks It is risky to assume the willingness, cooperation and participation of survivors of conflicts in the training workshops. Political and ideological differences among the conflicting communities may also affect the success of the programme while political instability and recurrence of active conflict could snap at any time and derail the programme.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 49

POVERTY REDUCTION

Introduction Poverty could be defined as the state of being poor, resources existing in too small amounts, scarcity or lack of and the state of being in want. As one looks at poverty, one must understand that poverty engulfs more than just the lack or scarcity of money. There are many dimensions that interlink to bring about poverty for an individual or a given community. These dimensions include, but are not limited to, culture, religion, infrastructure, economics, and politics. Examples of these different actors are a poor economy, lack of education, ignorance, natural and man-made disasters, the HIV/AIDS epidemic, lack of investment, and political instability. Finally, food, shelter, clothing, health, security and freedom of choice all have an important bearing in determining poverty in any given society. Categories of Poverty Dependants Many of the destitute such as the elderly, disabled and orphans are dependant on others for their livelihood and yet the very hosts they depend upon are equally chronically so poor that their economic status in the community is not sufficient to maintain themselves. Hence the level of dependence aggravates the degree of poverty. The transitory poor Many of those who are economically active may move in and out of poverty. Causes for this include person’s health, theft, conflict, disasters and the number of children in the family or economic crises. The economically active poor Many people may be active and productive, especially in agriculture, but are incapacitated to have access to services and markets because of remoteness, gender, and ethnicity. For example: in most countries in Africa, the majority of the poor live in rural areas with poor infrastructure that limit their capacity, giving them little or no access to services and markets. The landless and pastoralists Pastoralists are often illiterate and are geographically and politically remote. Despite the wealth they physically own they still lead a poor and primitive life in the community. Internally displaced persons and refugees Refugees and internally displaced persons often have little or no access to food and social services. They need external assistance in order to become stable: such conditions expose them to dependency on others and therefore more prone to poor livelihood earning. The urban poor These are those who live in crowded slum conditions and are a security risk to themselves and to others as people of low income earnings in the urban social strata.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 50

Objectives Goal The overriding goal is to provide an environment for improvements in the living conditions of the poverty stricken sections of the population through poverty reduction strategy. The method to reduce poverty is to create awareness for the people concerning their human rights, such as social, political and religious freedom, and access to resources. IAS will contribute to reduce poverty through long-term and short-term partnership and engagement with local communities and organisations. For further reference regarding the latter, see IAS Integrated Community Empowerment Programme policy. Purpose To reduce poverty among the people affected by IAS various interventions. Outputs Improved standard of life for the beneficiaries in terms of increased awareness of human rights and increased access to resources.

Activities and ways of implementation IAS seeks to reduce poverty by: • • • • • • • • •

Promoting human development through programmes in the social sectors such as education and health. Promoting local participation in the development process. Supporting public administration that is accountable and transparent. Supporting education and integrating education into other sectors like health, water etc. Contributing to reduction of vulnerability of the poor and empowering them Involving vulnerable groups like the elderly, ethnic minority groups and disabled into development programmes. Contributing to the elimination of ignorance rooted in cultural traditions and faiths that impoverish people or groups and preventing them from attaining positive social and economical development. Promote peace and reconciliation between ethnic and religious groups that are hostile to each other by using local initiatives as mediating tools. Promoting capacity building of local staff and personnel to enable local people to participate in poverty reduction.

Assumptions and risks • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the implementation of the policy. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitude and practice of the policy objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the current existence of coherence between the organisation is maintained. Sustained security access to and within project areas is assured. Sustained donor funding that allows the policy goal to be met.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 51

• • •

Overall policies for conditions relating to the policy objectives adapted by the national government in order for the policy to be in line with the national development. Cultural acceptance of the policy. Long history of poverty results in low morals culminating into depression which takes a long time to change.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 52

SECURITY MANUAL

Introduction IAS is operational in many severely insecure areas and ensuring the safety of all IAS staff and other personnel under IAS responsibility is an obligation to the organisation. This policy is intended to serve as a security manual for these categories of people. The Use of the Security Manual Each IAS staff with an assignment of field work should receive a copy of the manual, read it and sign the attached form before leaving for the field. The manual should work as a reminder on what to observe while working in the field. It should be read by the Field Coordinators at least every month and proposed amendments should be submitted to the Country Director.

Objectives Goal The goal for the security manual is to prevent incidents caused by insecure working environments towards the persons who fall under the responsibility of IAS. Purpose The purposes for the security manual are: • • • •

To enable IAS staff to best protect their staff and other persons under IAS responsibility working in conflict zones. To prepare staff for incidents that might occur while working in an insecure environment. To state clearly the responsibilities of both IAS, as an organisation, and the employee working for IAS. To give practical guidelines and procedures on how to best deal with security incidents.

Outputs The results that are expected from this security manual are: • •

Fewer incidents related to hazardous and insecure working environments. Guidelines and full overview for IAS staff on practical ways to protect IAS staff and other persons who fall under the responsibility of IAS. Such persons like Volunteers and International staff on field visits.

Activities and ways of implementation Responsibilities The guiding principle within IAS is that security is everyone’s responsibility. Each individual staff member bears as much responsibility for their own safety as does IAS.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 53

Responsibilities of IAS • IAS is concerned about the well being of its staff and believes that its human resources are central to the achievement of mission. IAS is therefore enforcing certain security principles to be implemented throughout the work of the organisation in order to protect its staff. • IAS is a relief and development organisation with a mandate to respond to crises situations. For this purpose staff is essential. • IAS will provide as much of security as possible for its staff but can not guarantee safety. • IAS will provide information on possible risk for its staff on a monthly basis through their Field Coordinators. Town offices will get their information through their Administrators. • IAS will train its staff on security awareness at different levels relevant to their duties. Responsibilities of IAS employees • All IAS staff shall always carry IAS ID card in order to identify themselves. Where applicable, passport, visa and travel permit should also be carried. • All IAS drivers should have a valid driving license which should be carried by the driver. • When travelling in insecure areas the employee should carry a Satellite telephone or radio. An up-dated list of emergency contacts should be attached. • Each staff shall submit to the Field Coordinator details on next of kin, blood group, allergies, insurance details etc. It is the responsibility of the Field Coordinator that these are regularly up-dated. • Before leaving the field the employee must be sure he/she is up-dated on the security situation. • If large amounts of money is carried it should, where possible, be divided between several staff. It is the responsibility of the Field Coordinator to ensure that maximum protection is provided. IAS provision IAS will not negotiate or pay ransom to any individual or organisation threatening or abducting IAS personnel. IAS will however use every national or international means to support, help and save its personnel. IAS will decide to remain operational in a specific area of armed conflict considering the impact and effect on the local population as well as the staff of IAS. Protection Property security • Robbery is a most probable threat in the field. It is therefore extremely important to ensure that maximum care is taken to protect staff, buildings and inventories from damage. • Each IAS office should be clearly marked. • All compounds should be as secure as possible. All keys should be clearly labelled and easy to find in case of emergency. • Keys to the vehicles should always be kept in a safe place and easy to find. • All field offices and camps should have first aid kit, emergency stock of food, water and fuel. • A list of emergency contacts should be known by key personnel and easy to find. • If large sums of money are kept it should be stored in two or three different places. • Maintain a good relationship with local staff and guards in particular. • Armed guards can be used in certain situation. The Country Director is to approve this. Vehicle security • Vehicles operating in the field must be in good mechanical condition. Each vehicle must have a spare wheel, jack, wheel spanner and a small set of tools. In addition there should always be a first aid kit in the vehicle. The Field Coordinator should on regular bases check the vehicles and ensure that all is in good condition. • Vehicles should only be driven by drivers specifically employed by IAS. Others should be authorized by the field coordinator to drive the vehicle. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 54

• • • • • • • • •

Where vehicles are fitted with radios, the drivers should be trained in using the equipment. Seat belts should be used at all times for driver and passengers in front seats. Speed limits should be followed. SPEED KILLS! The speed should be adopted based on weather and road conditions. When parked for the night the vehicle should have at least half tank. All IAS Vehicles should wear IAS stickers. In certain conditions they should also have flags. Weapons are strictly forbidden in IAS vehicles. Care should be taken when asked to give lifts to military and government personnel. If there is a risk that the neutrality stand of the organisation might be at stake, carrying of non IAS passengers should be avoided. Photocopy of vehicle documents should be kept in a safe place in the vehicle. All staff should know how to change a wheel and where the tool kit is.

Travel security • It is a known fact that most security incidents happen during travel. Precautions should therefore always be taken before and during travel. • IAS vehicles should only carry passengers authorized by the Field Coordinator. It is not allowed to pick up passengers at road blocks unless they have a letter of authorization by the IAS office. • Prior to departure the Field Coordinator should be informed about details of the journey. This includes names of passengers, goods and destination. • Changes in the travel plan should be communicated to the Field Coordinator who also should be informed when the vehicle has reached its destination. • Before departure the driver should ensure that all passengers have the necessary documents. • Before travelling on a new road, check if it is safe. Contact other NGOs, business people and local people who might have used the road recently. If there is any doubt special clearance should be obtained by the Field Coordinator who will consult with the security focal point. • Dependant on the security situation, driving by night should be avoided. Staff should ensure that they will reach the destination before dark. • Never travel alone in the car. • Always park the car facing the direction to which you want to leave. • Convoys: o During certain conditions it might be advisable to travel in a convoy of 2 or more vehicles. The convoy might or might not be escorted. o IAS vehicles should not take part in a military or civilian non-humanitarian convoy unless specific permission has been granted by the Country Director. o Convoys of more than 5 vehicles should have a convoy leader. o Radio contact should be kept between the first and the last vehicle. o All drivers should be briefed before departure in case the convoy is obstructed. Designated stops should also be decided prior to departure. o When driving in a convoy the speed should be low enough for all to stay together. Never overtake a vehicle. o A distance between the vehicles of 100 meters in day and 50 meters at night is recommended. • Road blocks: o A road block should be treated as any other military instillation. You may not be afraid of them but remember they might be afraid of you until they see who you are. Also remember that driving through checkpoints at night is much more dangerous than during daytime. It is more likely that soldiers are drunk late afternoon/evening. o Always slow down the vehicles when approaching a check point. Remove sunglasses, turn down all background noise such as radio and fan and wind down the window so that you can hear any command from the people at the road block. o Always dim the light if driving by night.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 55

o o o o o o o o

Always obey an order to stop. If the persons manning the checkpoint point their guns towards you all in the vehicle should remain calm. Never make any fast move or jump out of the vehicle. Answer all questions accurately. If asked to open the boot or luggage, don’t argue. Report any abuse to the local authority. Try to identify the person concerned by taking the name. Resist pressure to give lifts to unauthorized people. If waved through a checkpoint, make sure his fellow soldier agrees with this. Drive slowly and watch the mirrors and be prepared to stop immediately. If you hear gunshots, stop immediately and remain calm inside the car. Wait and see. Don’t give bribes or ‘gifts’. You might be passing though regularly and you spoil for yourself and others.

Communication • IAS considers good communication important for safety. Even if the best equipment is used and the staff does not know how to use it, it is of no use. IAS is mainly using two communication systems; radios and sat phones. Both systems have strengths and weaknesses. Remember that radios can be monitored by anyone who has a radio and tuned in to your frequency. The sat phones can be monitored by the country security organ. • Communication should be brief and straight to the point. Avoid unnecessary greeting phrases etc. Use SMS messages for Thuraya sat phones but remember that it sometimes takes long time to send and receive. • Make sure that you have the knowledge to use the equipment. • Make sure you have enough credits on your sat phone. • The radio and sat equipment should be on standby 24 hours in emergency situations. • Details in an emergency situation to be communicated to IAS Field office and UN when applicable: o Give details on who you are o If possible give the coordinates for your location. o Give report on the incident. What happened, where did it happen, when did it happen, what response made, what help wanted o Make sure that your messages have been received. Mine awareness Land mines Land mines are widespread and are a serious problem in armed conflicts. They are a threat to civilians long after the conflicts are over. Areas with land mines are difficult to clear as there are seldom accurate maps and mines are spread randomly. They might even move as a result of heavy rains and floods. Typical mine areas • Former or existing military bases, camps and stores and the area surrounding them. • Around former military routes, roads and paths. • On or around mountain tops or areas of high ground that once have been used as military positions or observation points. • Around airfields, power stations, telecommunication centers and similar installations of military and strategic interest. • Dry riverbeds near former or existing military positions. • The scenes of fighting in the past. • To the rear of blockhouses or road checkpoints. • Near bridges and river crossings. • Under shady trees. • Overgrown disused areas. • Near water sources. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 56



Abandoned villages.

Precautions when walking in high risk areas • Try to avoid high risk areas but if you find yourself in one of these areas there are some basic guidelines to follow. • Be alert at all times. • Travel with a guide at all times. • Do not take short cuts. • Look for warning clues. • Do not step over or cut a trip-wire. • Do not touch mines or unexploded ordinance. • Ask the local people about known or suspected mined areas. • Stick to well worn paths on roads and follow animal and human, cart or motor tracks wherever possible (this will not necessarily work if mines have been laid recently). • Travel in single file. • Stay at least 10 meters apart. • Report any sightings of mines or unexploded ordinance to the local authorities and the local people – but do not tell children who may go and look. • Do not explore ruins or abandoned villages. • Do not go ‘souvenir-hunting’. Vehicle and Land mines General precautions: • Never assume that a road is clear of mines just because a light vehicle or a few heavy vehicles have passed along it without incident. • Do not consider any road that has been reportedly cleared as entirely safe if the clearance did not extend into the verges. Basic precautions: • Never travel along possibly mined roads unless they have been tested over time by the passage of large number of heavy vehicles. • Where there is a known risk of old mines but no evidence of new ones, stick to the well worn roads and never drive where there are no previous vehicle tracks. • Drive with extreme caution, keeping your eyes open for obvious holes in the road surface. It is NOT TRUE that if you drive fast enough, you will escape the blast of a land-mine. In fact all this will do is to make your vehicle to come off the road even faster, so increasing your chances of being injured. • Never overtake on the verges. • Always wear seat belts. If the vehicle turns over because of a mine explosion, it is better to be well strapped-in and turn with it. • If a vehicle is involved in a land-mine incident, remember that anti-personnel mines may have been laid in conjunction with the mine. Personnel on foot and other vehicles arriving at the scene should be told to stick to well worn vehicle tracks in the middle of the road and not to walk or drive on the verges. • If you leave the vehicle in such an area, always exit with care from the side of the vehicle nearest the centre of the road. • Sandbags placed under the seats and on the floor of the vehicle can absorb some of the blast. How to get out from a minefield? • If suspicion have been raised that mines are found, remember that there could be many mines in a limited area. There fore treat the whole surrounding area as a minefield. • The most likely indicator of a minefield will be a casualty. • Uninjured people MUST observe the following procedures rather than immediately rushing to the aid of the injured person as this could lead to further casualties. • As soon as you realize you have entered a minefield: International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 57

o o o o o o o

o o o

Stop. Stand still and check the ground around your feet. Identify the nearest safe area, such as a tarmac road or a patch of ground upon which vehicles have drive or many people have walked. Facing this safe area, carefully check the ground in front of you for signs of disturbances, depressions where the soil has subsided, visible fuses or trip-wires. If seems clear, advance. If you discover a mine do not touch it. Mark the spot, using twigs within reach or items of discarded clothing and circumvent it. If you have reached a safe area, you need to re-enter the minefield to assist a casualty follow the route you have just marked to where you started. Then, following the same technique, check and mark the rest of the route to the casualty. When you reach the casualty, try to avoid giving them first aid while you are still in the minefield, since while doing so you may not be able to confine your body movements to the safe area. Drag the casualty from the minefield following your previously checked and marked route. (But if you have to travel a long distance to get out of the minefield, it may be better to treat the casualty on site. Treated casualties who cannot see their blood pumping out will be easier to handle in the middle of a minefield than those who think they are dying). Upon reaching the safe area, give emergency first aid to the casualty. Your first priority is to stop the bleeding. Mark the mine area with a sign or other means of identification. Organize the immediate evacuation of the casualty to a centre where they can receive proper medical care.

Facing Hostility The general principle in hostility situations is to ALWAYS REMAIN AS CALM AS POSSIBLE AND AVOID PANIC. The following precautions should be taken when hostile situations occur: • • • • • • • • • •

If fighting occurs it is in most cases safer to stay put. Moving to a safer place should only take place when fighting stops or gets less, or if reliable information suggests that this is the safest thing to do. Staff should try to stay together, or at least within easy communication distance of each other. If someone is injured in the fighting, you should weigh the seriousness of the injury against the risk of going for help. Members of staff who become separated from the main group or base should report their position, or report that they are safe as soon as it is possible. When reporting on the fighting itself, staff should give factual information only, using predetermined code and keeping the messages brief. Always listen to the advice of local people. If in a building – stay clear of the windows. Do not go out on the balconies or roofs to watch. If in a vehicle when shelling or bombardment is likely to occur, immediately leave the vehicle and run for cover as far away from the vehicle as possible. If you have no time to stop the vehicle and run, make U-turns or zigzag rather than to drive in a straight line.

When IAS is a target Being a target of a local armed group requires adopting a very different approach to security. Hold-ups and hostage If you are held up or taken hostage: • •

Cooperate Remain where you are – never try to run away.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 58

• • • • • • • • •

Make sure your hands are clearly visible. Do not be aggressive. Remain passive. Move slowly with precise gestures. Speak quietly and distinctly. Do not talk among yourselves more than necessary, particularly if it is in a language not understood by your assailants. Do what you are told. Give what they request. Identify yourself. Ask for assistance in returning to safety.

The Aftermath • No one sees a disaster and is unaffected by it. Disasters and crisis stress reactions are normal responses to an abnormal situation. IAS offers staff that suffers from crisis stress as much help as possible. • Staff will be debriefed by a qualified person on the field. • If the staff has undergone intense stress and they need further help IAS will offer them critical incident stress debriefing locally or if more appropriate by sending a qualified professional de-briefer, or otherwise by repatriating the victim. Relocation and Evacuation When the security situation deteriorates too far, the emergency evacuation of staff is sometimes the only response. For this reason an up to date contingency plan for emergency evacuation should be prepared in the field. This plan should, wherever it is feasible, follow agreed plan by the plans of UN and other NGOs. Evacuation is needed when: • • • • • • • • •

It becomes clear that an escalating local conflict will continue for a long time. Severe fighting seems likely to break out in the near future. Staff is exposed to unreasonable risk. Told to leave by the controlling forces. The relevant embassies or High commissions have advised foreign nationals to leave. If staff is not exposed to unreasonable risk, there may be a cause of scaling down to a skeleton staff and staying to observe events. This could mean that certain project activities temporarily need to close or be reduced. In case of an urgent emergency situation, the evacuation can be imposed immediately and unilaterally by the Country Director or person mandated by him/her and the IAS headquarters in Europe. The reason is that any of these parties can have information that is so urgent and sensitive that it can not be communicated over radio, email or telephone. The decision to return to the evacuated area must be made by the authority that issued the evacuation order in close collaboration with IAS senior management team.

To stay or leave IAS will never force any staff to stay in an insecure place against their will. If a staff member wish to withdraw due to inadequate security this will be respected and facilitated when possible. Where possible staff will be offered work in alternative locations. Contingency plans Contingency stock of essential supplies should be prepared at all times. The following factors should be considered when drawing up the contingency plan. Type of evacuation • Partial withdrawal. Should a small group of staff remain in order to maintain a presence in the area? How many project activities should close? Any foreseen time frame?

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 59



Total withdrawal. The IAS office will close completely and all staff should be evacuated. All IAS activities should cease leaving behind no official presence.

Duration of withdrawal • Temporary • Permanent • Destination o Temporary or permanent relocation to a nearby place that is outside the area of immediate danger. o Another region in the same country. o Another country. Means of withdrawal • Form of transport – cars, foot, air. • Who will provide the transports? • Is escort needed? Project equipment • Should all, some or none of the equipment be taken along? Evacuation plan A written evacuation plan should be prepared in each location that that IAS senior management team considers ‘high risk security area’. It is the responsibility of the Field Coordinator to prepare this. The plan should be sent to the IAS Country Director for endorsement before it is shared with the staff. After endorsement it is a must that each staff member is made aware of the security procedures in the plan. Contents of the plan The evacuation plan should cover the following aspects, a series of indicators/measures of security levels: • • • • • • • • • •

A set of actions and procedures to take place when security levels change. Identify priority targets and risk areas for each field location. List of all staff that are included in the plan, divided into groups, with group leaders. Individual responsibilities in plan. Possible evacuation routes with maps. Means of transport and the regulations governing them. (Contingency plans should be made for hiring transport in case IAS vehicles are commandeered). Communication arrangements on route. This should include emergency codes. Personal documentation needed and rules about which personal belongings can be brought out. Project equipment to evacuate. Vehicles and equipment to be left behind.

Assumptions and risks • • • • •

Politically tense working conditions for IAS staff. Sustained security access to and within project areas is assured. IAS staff trained in security related matters and having full insight and awareness of the local security conditions surrounding them. Full provision of up to date technical equipment and materials. Sustained donor funding that allows for the policy goal to be met.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 60

SPECIAL NEEDS EDUCATION

Introduction The purpose of education for all children is the same; the goals are the same. But the help individual children need in progressing towards the goals is different. IAS values all input placed in all education as an investment and aims to ensure that appropriate education provision is made for children and young people of all abilities through special needs education. The IAS policy on special needs education is a wide-ranging one, extending well beyond the education service. It requires us to take into consideration of the health and psychological needs of the children and young persons with special needs, together with preparing theme for integrating them into their societies. The policy takes into consideration the social aspects of their needs, to relations between the different professionals engaged in meeting the needs of special needs, to the contribution of their parents and the parents own needs for support children with special needs. IAS is committed to its mission to save lives, promote self-reliance and dignity and enable people to invest in their future, regardless of race, creed, gender or nationality of the recipient and will therefore ensure equal opportunities in order that all children benefit fully from their educational provision and develop their full potential. The policy also supports the need for research and development in the provisions for special needs. The extent of special needs education is very difficult to assess. The scale on which children are ascertained as requiring special needs education varies widely from one society to another.

Objectives Goal and Purpose The goal and purpose of this policy is to train all children including those who may: • • • • •

Have sensory impairments. Have severe learning difficulties. Exhibit severe disruptive behaviours. Have severe physical problems that interfere with learning. Be exceptionally intelligent or talented.

Output The output is to have quality educational programmes meeting the needs of the beneficiaries and the society and as a whole. What are special educational needs? A child has Special Educational Needs if he/she has a learning difficulty, which calls for special educational provision to be made for him/her. Such children may require specially designed education programmes to meet their individual needs. They may also require supportive services from specialized teachers, speech therapists, audiologists, physiotherapists and occupational therapists, psychologists, counselors and others. IAS believes that exceptionally intelligent or talented children also fall under this category, since they require special attention

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 61

for their personal growth which the ordinary school might not be able to cater for. Therefore, they shall also be given the provisions as stipulated in this policy. A child has a learning difficulty if he/she: • •

Has a significantly greater difficulty in learning than most other children of the same age Has a disability which either prevents or hinders him or her from making use of educational facilities of a kind generally provided for children of his or her age in schools within the area where IAS works.

Learning difficulties may be due to, for example: • • • • •

A physical or mental disability. A medical or health problem. Difficulties with sight, hearing or speech. Emotional and behavioural difficulties. Difficulties with language, reading or number work.

Basic principles Guiding principles The major guiding principle of IAS is its commitment to its mission to save lives, promote selfreliance and dignity and enable people to invest in their future, regardless of race, creed, gender or nationality of the recipient and will therefore ensure equal opportunities in order that all children benefit fully from their educational provision and develop their full potential. This policy therefore aims at helping children and young people to become independent, caring, able to form independent judgments and aware of what they can contribute to and expect from society. This is done through: • • • • • • •

Encouraging effective participation of all key stakeholders in education to provide inclusive education to all children. Work collaboratively with schools, encouraging and supporting them in taking responsibility for the learning of all the children in the areas of IAS’ operation. Make arrangements for the early identification of pre-school children with special education needs and provide appropriate specialist Make arrangements for the identification and assessment of the educational needs of children experiencing complex and significant learning difficulties. Work with parents as partners in the interests of children who require special educational provision. Support the professional development of staffs who work with children with special educational needs. Monitor and evaluate the effectiveness of the policy for children with special educational needs.

Provision • IAS will enable children with special educational needs to be educated in local schools where possible and desirable, provided this takes into account parental views, and is compatible with the child’s receiving the special educational provision which his/her learning difficulty calls for. • Every effort will be made to ensure that special educational provision will be consistent and coherent for all children with educational special needs. • It should be planned carefully to allow continuity between phases, with agencies/other schools and between mainstream and specialist provision. • In making a suitable provision, IAS will be aware that children and young people: o Have different educational needs and aspirations. o Have different strategies for learning. International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 62

o o o o

Learn at different rates. Need a range of different teaching approaches and experiences. Achieve different levels of attainment in line with their different capabilities. Have differing skills, interests and personalities resulting in differing needs.

Therefore a variety of teaching approaches and methods are required to meet this variety of need. IAS’ provision will be monitored to ensure that children’s needs are met appropriately and adequately, consistent with the efficient use of resources. It will be supported by an administrative procedure which is collaborative and understood by parents, partners, professionals and volunteers. IAS field office will work closely with colleagues from nearby Hospitals or Health Centres in a partnership which will aim to meet the needs of the whole child.

Assumptions and risks • • • • • • • • •

Willingness of the communities and local authorities to actively endorse and take part in the project. The community is willing to be self-reliant and not dependent on continual external assistance (aid-dependency syndrome). The community is able to accept and adapt to knowledge, attitudes and practice of the project objectives. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Inter-agency partnership and the existence of coherence between the organisation, IAS´ project design and other agencies in the operational areas such that the latter’s activities and strategies do not hamper negatively the project goals and purpose. Sustained security access to and within the project areas is assured. Sustained donor funding that allows for the project goal to be met. Overall policies for conditions relating to the project objectives adapted by the national government in order for the project to be in line with the national development. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 63

VEHICLE

Introduction The safety of the staff and guests is a central concern of International Aid Services. The policy governing the use of IAS vehicles by staff is designed to support safe prudent use of vehicles. Vehicles cost a lot of money to purchase, maintain, and insure. As such a policy guideline in place is deemed necessary so that IAS gets the best out of its vehicles life spans. The following rules not only protect the employer from unnecessary losses but also benefits the employee in that higher vehicle costs means endangering project goals which might lead to termination of projects before the projected time.

Objectives Goal The main goal for this policy is to make IAS staff aware of the importance of vehicle maintenance, and good practice of using the vehicles. Purpose The purpose is to ensure safe travel of all IAS staff and to avoid any accidents involving both IAS staff and others; also to minimize costs towards maintenance. Outputs IAS staff maintaining and handling vehicles in a responsible and correct manner.

Activities and ways of implementation IAS will make sure that this policy is implemented and maintained by using some important guidelines and rules, see below. Approved Drivers • IAS vehicles are to be driven by IAS employees who are 18 years and older, holding a valid driver’s license and having driven for at least one year. The employee must also be authorized by the relevant IAS authority to drive the vehicle. In order to drive, employee drivers must have a driving record free of any two moving violations in the past year, or one moving violation and one accident, or two accidents, or any single alcohol related stop. • A driver could also be a non-IAS staff who has been authorized by IAS to drive an IAS vehicle, provided that the same conditions as for an IAS driver are met. • IAS shall ensure adequate funds, spare parts and skilled personnel to handle maintenance

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 64

Driver Responsibilities • Drivers must be in possession of a valid drivers license or a copy whenever driving an IAS vehicle. Also, drivers must report any change in status of their driving record immediately to the Management. • Drivers shall be alcohol and drug free. This includes prescription and non-prescription drugs that may impair a driver's judgment or other faculties. • Drivers are responsible to ensure that the vehicle is used only for IAS business. • Drivers are responsible for inspecting the vehicle prior to going on any journey or errand. • Drivers must observe all traffic regulations. Drivers are personally responsible for any traffic tickets that may be issued as a result of operating an IAS vehicle. • Drivers must not drive when driving conditions are hazardous – this includes but not limited to fog, heavy rains or any conditions that might endanger the driver and those with whom he is in the vehicle let alone the vehicle itself. • Drivers must report all accidents to their immediate IAS supervisor and when relevant also to the nearest police station or local authority. • Drivers must report any irregularities on the vehicle to those responsible for maintenance.

Assumptions and risks • • • •

IAS staff trained in vehicle maintenance. The community is able to accept and adapt to knowledge, attitude and practice of the policy objectives. Sustained donor funding that allows for the policy goal to be met. Cultural acceptance for the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 65

VOLUNTEER

Introduction A volunteer shall be considered as any individual, 16 years or older, who assists with IAS Operations within the Operational Areas where IAS works, without remuneration. Exceptions to the age requirement may be made by the Regional Board. International Aid Services recognizes that volunteers have a positive contribution to make to the work of the organisation and its various activities. It aims to encourage volunteers' involvement in all aspects of its work, as a means of empowering and supporting the local community, as well as creating an avenue for volunteers to gain practical field experiences in areas of their specialization.

Objectives Goal The goals for this policy are to: • • •

Provide a platform for missions out reach. Give opportunity for gaining experience in relief and development work. Provide attachment opportunities for learning through experience in fulfilling college requirements or gaining practical experience.

Purpose The purpose is to highlight the need and relevancy of reaching out to the most needy people groups of the world. Outputs Expected results are a good foundation for volunteers to reach out with a helping hand to the unreached and fulfil their goals in life.

Activities and ways of implementation IAS will use the following guidelines and principles in the implementation of this policy: •



A volunteer shall apply in writing attaching all relevant documents and thereafter shall go through a formal interview by a select committee of the relevant IAS office in which the application is received. One of the relevant documents attached should be a letter of recommendation from the church leader of the applicant. Those doing internship should submit both the recommendation from their church and from the learning institution that is sending them. The voluntary service shall be for at least one month. More than one month will require a contract to be signed with IAS for accountability purposes with a maximum of a one-year voluntary period.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 66



• • • • • • • • • •

All volunteers shall sign the IAS non-liability claim agreement form. One such signatory shall be from the closest relation of the volunteer. A non-liability agreement is a document that stipulates that the said volunteer will not hold liable the organisation and its officials, employees or agents for any claim or action for any loss, damage, injury or death that might occur to him or her in the course of service. (see attached form for details) Volunteers shall abide by IAS staff code of conduct. Volunteers shall submit to and report any issues they encounter while in the field to the field coordinator or immediate supervisor. Flexibility is required of all volunteers in case of change of location of service, as the management deems necessary. To maintain good working relations and build bridges, volunteers are expected to respect the customs of the people in areas where they are working IAS shall facilitate the transport, food and accommodation of volunteers when in the field, when feasible. Serving as a volunteer with IAS shall not necessarily lead to employment in the organisation. Volunteers are not entitled to any specific benefits during or after the period of their service. Volunteer service is ministry. Volunteers are entitled to rest and recuperation (R & R) after a certain period of time that will be arranged by the immediate supervisor. Details on location and terms of service will be mentioned in the contract signed by the volunteer and the organisation. Prior to accepting the volunteer a medical examination will be performed as per IAS medical standards. Volunteers shall be required to submit progress reports while in the field and a final report to IAS after the period of their service. IAS will provide an orientation for the volunteer where IAS policies, culture etc. will be communicated.

Assumptions and risks • • • •

Willingness and administrative preparedness for IAS offices to receive and cater for volunteers. The organisation, IAS, is able to progressively build the capacity of its staff to deliver quality service while maintaining close links with the community. Sustained security access to and within the project areas is assured. Cultural acceptance of the policy.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 67

EMPLOYMENT

Introduction People in Aid Code IAS is a member of People in Aid (PIA). IAS therefore agrees to commit itself to an external ‘standard’, which consists of the PIA Code as well as to the PIA message: • • •

People are central to the achievement of mission Accountability towards staff and volunteers Good people management can increase the impact of programmes.

The PIA Code is expressed in seven principles: 1. Human Resources Strategy; Human resources are an integral part of our strategic and operational plans. 2. Staff Policies and Practices; Our human resources policies aim to be effective, fair and transparent. 3. Managing People; Good support, management and leadership of our staff is key to our effectiveness. 4. Consultation and Communication; Dialogue with staff on matters likely to affect their employment enhances the quality and effectiveness of our policies and practices. 5. Recruitment and Selection; Our policies and practices aim to attract and select a diverse workforce with the skills and capabilities to fulfil our requirements. 6. Learning, Training and Development; Learning, training and staff development are promoted throughout the organisation. 7. Health, Safety and Security; The security, good health and safety of our staff are a prime responsibility of our organisation.

Objectives The goal and purpose of this policy is to abide and fulfil the above mentioned People in Aid Code. IAS believes that this standard is of vital importance for the management of all staff and expects an output of highly committed staff being managed in a tight, caring and correct way.

Activities and ways of implementation IAS as employer Job-description IAS provides the new employee with an appointment letter and detailed job description before the work commences. The objectives for the assignment as well as concrete, well-specified and limited functions will be spelled out. It will be clear to the employee who will be his superior, and within which frames the employee can make independent decisions or when the immediate International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 68

senior colleague has to be consulted. The job description can be changed during the contract period. Requirement for employees IAS expects staff members to fit into their assigned positions within the Organisation and obey lawful instructions from those to whom they are accountable to. All new staff must serve a probationary period of at least 3 months. At the end of the probation period their status will be reviewed. The employee Service IAS assumes that all staff are highly committed to the organisation and that the aim for the employment is to support the IAS motto “Creating a positive change” in peoples’ lives. IAS is a platform where the employee can use and develop his/her talents. Moral standard IAS expects that the employee lives a moral life that can be examined, and serves as an example to staff and others. The employee is expected to abide by the IAS Code of Conduct. IAS is a non-alcoholic, drug free and smoking free organisation. Teamwork IAS believes that teamwork creates possibilities for success, and gives protection against abuse of power. The decision making staff is encouraged to communicate with other staff not only in a hierarchic way, but to listen to colleagues in order to create a two-way communication. Cooperation between staff is necessary. Every project leader should have a colleague to discuss ideas and problems with, and has to be open to suggestions and corrections. Background and education It is of great value that the employee has an adequate background education to accomplish the tasks he/she will perform. IAS attaches great importance to personal qualities like social competence, co-operation ability, creativity, stress management, adjustment to different cultural environments etc. Cultural adjustment IAS employees should obtain information about the conditions and the people in the country or in the area he/she will be working in. It is obvious that the employee adjusts his/her way of dressing, ways of treating people, relationship with the opposite sex etc. to local circumstances. The employee must be willing to listen, and to be corrected by a more experienced colleague. For expatriate staff IAS recommends special courses for culture adjustment that are available within different schools and agencies. Termination of Services The service can be terminated by the employer or the employee on the condition that any of the parties gives a written notice not less than 1 month prior to termination of the employment or otherwise specified in contract. Temporary Employment Temporary employee is a casual employee engaged by International Aid Services to do a specified work and is paid on a daily basis. Such services as rendered by a temporary employee may be terminated any time without notice being given by either party. No other benefits apart from wages are applicable to this category.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 69

Short term Contract Employees/Consultants A contract employee is one who is hired to discharge a specified job for an agreed time or period and at an agreed pay. Contracts are administered through agreed terms and conditions of service. Any change of the conditions of service is to be done in writing. Short-term contracts do not exceed 6 months. Duration of the contract The duration of the contract will be well specified. Possible extension of the contract may be given with the consent of the employee. Request of extension of the contract has to be given in writing at least 3 months before the expiry date. Payment policies and procedures Salaries/Wages Staff will be paid a salary according to the agreement, contract or letter of appointment. Any amendments are to be effected by a written letter from the IAS Senior Management. Salary and applicable allowances will normally be paid monthly and in arrears on or before the last working day of each month. Staff may receive their salaries by automatic bank transfers or in cash depending on their work places. Appropriate taxes will be deducted according to prescribed regulations in a given country of operation. Working hours Working hours per week are adjusted according to the labour regulations of the respective country. Recommended working hours are 40 hours per week. Allowances Gross salaries include all allowances. Medical allowance or reimbursement of medical bills is only applicable to the employee if clearly spelled out in the contract. No travelling allowance will be given for field trips. Reimbursement will only be given according to actual costs and upon submission of accurate receipts. Loans International Aid Services grants no loans to any employee. Terminal Benefits/Gratuity A gratuity will be paid according to the labour laws of the respective country. In countries without labour laws or in countries where the labour laws do not cover terminal benefits/gratuity IAS will pay a maximum of one-month salary after a minimum of 12 months of service. When a person enters into a new contract of employment with International Aid Services then he/she may immediately claim the accumulated gratuity on the old contract. This would be payable at the date when the contract comes into force. Payment would be done at the rate of the old contract on the final day before it was superseded by the new contract. If International Aid Services has a claim against the individual for loss of money or property the accumulated gratuity will be forfeited from the right of the employee. Death If a staff member dies, the next of kin will receive 3 months salary on the condition that the employee has been working for the organisation for at least one year. In cases where death results from injury connected to the nature of work of the employee the labour laws of the respective country are applicable. Members of staff are requested to inform the personnel officer specifying to whom their benefits should be paid in the event of their death.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 70

Staff development Training International Aid Services supports a policy of progressive development for staff. All training will be directly relevant to the responsibilities of the officer. Details can be found in the IAS Staff Development Policy. Promotion Promotion may occur for an employee moving to a more responsible job, or in some circumstances the responsibilities will be extended within the current job. A formal interview will be held. During the interview clarification will be made to the employee of the implications of taking on additional responsibilities, his/her competence in being promoted. The promoted member of staff will be paid the salary according to the contract from the date of assumption of duty. Under no circumstances will a staff member be promoted when still serving on probation. Leave and sickness Annual Leave An employee who has completed 12 consecutive months of service with International Aid Services shall be entitled to 21 working days leave with full payment or leave according to the labour laws of the respective country or if otherwise outlined in employment contract. Annual leave must be taken in the year it is due at a time mutually convenient to both the employer and the employee. A schedule for leave must be prepared by the beginning of the fiscal year, a copy of which should be sent to the Senior Management for approval. Sick Leave • Sick leave has to be reported the first day of absence. • Sick leave of more than 3 days must be evidenced by a doctor’s certificate. • On the basis of a valid medical certificate, long-term sickness leave will be granted for 2 months or according to the respective labour laws. After 2 months of sick leave International Aid Services is not obliged to keep the person as an employee. • Treatment for injury that occurs at work will be covered up to a maximum of $1000 (one thousand US dollars only), but not necessary the entire value, if the treatment requires less. • The employee is encouraged to get his own insurance at his own cost in order to add coverage in case of sickness or injury. Maternity Leave • International Aid Services recognises the need for an expectant mother to have adequate rest both before and after childbirth confinement. Maternity leave shall consist of 60 calendar days with full pay effective 15 days before childbirth with the exception where the Employment Act says different in that country. • Any additional days required will be taken as un-paid leave, except on production of a doctor’s certificate certifying that one is unable to resume duty on medical grounds. • When maternity leave is taken, annual leave will be forfeited for that year. Adequate notice (minimum 4 months before expected delivery) must be given to the Senior Management when maternity leave will be taken. An employee is eligible for paid maternity leave once every two years. • Following the maternity leave, lactating mothers will be allowed 2 hours off to go and breast-feed their children every working day either before lunch or after 3:00 p.m. for a period of 2 months. Compassionate Leave Compassionate leave of 5 working days will be granted on the occasion of death of spouse, child, mother or father.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 71

Unpaid Leave A person may apply for leave without pay in order to attend to a personal issue. Holidays All official public holidays will be observed by the staff and taken. Certain category of staff on management level will be expected to be on duty. Disciplinary procedures Minor offences These are offences deemed by the management to be contrary to the standards of the Organisation but not serious enough to lead to dismissal or suspension. Examples are: • • • •

Occasional lateness/unauthorised absence. Poor work performance, carelessness, untidiness. Poor co-ordination with other staff; Breaking specific rules, safety procedures or other procedures set down by the organisation and known to the employee.

First or Second Offence On first or second offences, the Senior Management will give the employee a written warning explaining the nature of the offence, the importance of not repeating it and the penalties that can be applied if it is repeated. The warning should always be attached to the employee’s personal file. Failure to react positively on First Warning Formal procedures will apply if first warning has had no effect. In such case, the Senior Management will give a formal second written warning to the employee explaining the nature and seriousness of the offence. The warning should always be attached to the employee’s personal file. Second Warning Following delivery of the second warning, the responsible person will hold a formal interview with the employee during which the contents of the letter will be discussed. Third/Final Warning Suspension If there is further offence or for even more serious issues, the Senior Management will automatically issue a second and final warning to the employee. Following delivery of the warning, there will be a third formal meeting attended by the employee. The Senior Management will keep records of the meeting. At the meeting, the employee may if he/she so wishes be accompanied by another member of staff as a witness. Depending on the seriousness of the offences, this warning may be accompanied by suspension without pay for a maximum of 14 days. The member of staff being disciplined must countersign all disciplinary letters or minutes of the proceedings of the disciplinary interviews. Such copies of documentation must be put on the staff member’s personal file. Suspension without Pay and Summery Dismissal If the offences occur after the issuing of the final warning, the Senior Management will recommend action. This may be suspension without pay for one month or dismissal without benefits depending on the seriousness of the offence and in accordance with the labour laws in the respective country. The Senior Management will discuss with the supervisor on site who will carry out and implement the agreed penalties.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 72

Serious Offences These are the offences deemed by the management to be sufficiently serious as to require immediate application of formal procedures. A typical example of the above offences or more serious breaches would be: • •

Physical abuse. Refusal to follow clear or reasonable instruction.

In such cases, the formal procedures will be by-passed and the supervisor on site will immediately report to the Senior Management to issue formal warning letters. If the offence(s) is thought to be serious enough, the Senior Management will issue a second warning letter without having issued the first and will consider disciplinary action to a maximum of suspension without pay, for up to 1 month. Appeals At any stage of the above proceedings, the employee may appeal to the Senior Management. The Senior Management will then investigate and make a final decision. Gross Misconduct There are offences that are sufficiently serious to warrant immediate dismissal with no notice and no benefits. Examples are: • • • • • • •

Fraud or intent to defraud by falsely claiming sickness or other benefits, or giving incorrect information to the Organisation in order to receive additional benefits; Misappropriation of the Organisation’s funds through false receipts or expenditure statements or other means; Misuse or damage of Organisation’s property or deliberate acts that cause loss and disrepute to the Organisation; Unauthorised disclosure of confidential matters in a manner harmful to the Organisation; Physical attack on a colleague or member of the public; Engaging in political activities which are detrimental to the interests of International Aid Services, and other activities than those in the conditions of services; Use of alcohol, smoking and drugs whilst on duty;

There may be other types of gross misconduct that may be determined at the discretion of the Senior Management. All such instances will be immediately reported to him/her. Grievances procedures From time to time, a staff member may have a legitimate grievance against a colleague, or the Organisation in relation to benefits that may apply to him. This for instance could be condition of work, unreasonable instructions, poor co-ordination or other matters. First point of Grievance This will be with the employee’s Supervisor, if the latter is not the one against whom the grievance is held. The Supervisor may investigate the matter and if possible solve the issue to the employee’s satisfaction. Second point of Grievance If the point above does not achieve satisfactory results, the employee through the Human Resource Manager may present the issue to the Senior Management. If all those channels fail, the grievance may be presented in writing to the Regional Board. The Regional Board will investigate and take appropriate decision. The decision will be final.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 73

Grievance against the Country Director/Representative or the Organisation represented by the Director/Representative For grievance held against the Country Director (Country Representative), or the Organisation as represented by the Country Director (Country Representative) the employee may appeal to the Senior Management through the Human Resource Manager. The Human resource manager will then present the issue to the Regional Board. The Regional Board will investigate the matter and reach a decision. The decision will be final.

Assumptions and risks • •

Sustained donor funding that allows for the policy goal to be met. Highly committed staff.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 74

RECRUITMENT

Introduction This policy shall be followed for all IAS vacancy openings, with the exception of temporary and short-term appointments (3 months or less).

Objectives Goal/purpose The goals and purposes of this policy are to: • • •

Ensure that IAS attracts, identifies, and hires the most qualified applicant for the job. Ensure that appropriate funding levels are identified and approved for each position. Ensure that confidentiality for all is maintained in the recruitment process.

Outputs The results attained should be highly qualified applicants receiving employment in IAS.

Activities and ways of implementation Equal Employment Opportunity It is the policy of IAS to provide an environment free from discrimination, including sexual harassment and sexual assault. As per IAS Mission, IAS does not discriminate against eligible persons on the basis of race, creed, gender or nationality. No qualified person shall, on the basis of race, creed, gender or nationality, be excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination in IAS programmes or activities. Confidentiality To protect the privacy of candidates and to preserve the integrity of the recruiting process, all committee members are required to maintain confidentiality throughout and after the conclusion of the recruitment process. Confidential information includes matters discovered or discussed during the recruiting process. All information relating to the search may only be discussed with other committee members, the Human Resource Manager or IAS Senior Management. Employees who violate this requirement for confidentiality will be subject to corrective or disciplinary action. False information from persons appointed shall be reported to the Human Resource Manager. The qualifications and experience of successful candidates that they presented during the hiring process may be publicly shared following the search. Reference checks of applicants shall be made, and the committee is not limited to those persons listed as references by the applicant. Employment of Relatives IAS permits the employment of one or more relatives. However, staff and administrators shall not initiate or participate in decisions involving a direct benefit to members of their immediate International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 75

families. Immediate family for purposes of this policy shall mean spouse, children, siblings, parents, members of the extended family, in-laws and grandparents. Recruiting IAS shall require recruitment under the following circumstances: • •

When filling a vacancy for a probationary position (more than 6 months). When filling a vacancy for a temporary position with a duration period greater than 3 months but less than 6 months. • Recruitment is not required under the following circumstances: o Appointments funded by a grant or contract where the individual is specifically named in the grant or contract. o Special or emergency appointments as deemed necessary by the Regional Board. o Transition of an employee from a lower rank within the same Sector to a higher rank or position. • IAS shall only conduct recruitment upon approval of the appropriate budget. It shall be the responsibility of the Country Director/Representative to obtain all the necessary budget approvals before submitting the requisition to the Human Resource Manager. The Country Director shall indicate on the recruitment request the maximum salary level budgeted for the position. • IAS will require that all position openings be advertised. In outstanding and unusual circumstances, the Human Resource Manager may determine and advise that the advertisement may be waived. Recruitment Process IAS shall require that a current position description be submitted to the Human Resource Manager before recruiting. All posts will be specified in the budgets approved by the Senior Management team of IAS. Prior to recruitment of any posts, a detailed job description will be prepared by the prospective supervisor of the staff being recruited and approved by the relevant office concerned. It shall be the responsibility of the Country Director/ Senior Manager to identify the minimum qualifications and essential functions of the job; and then present such to the Human Resource Manager. Recruitment Approved posts shall be advertised stating the required skills/competencies and personality of the staff being sought through any or a combination of the following: • • • •

IAS web page. Media. Church contacts. Existing staff.

In filling the posts, preference will be given to existing staff that have the right qualifications and experience needed for the position. It shall be the responsibility of Human Resource Manager to receive, track, acknowledge, and store all applications. Only applications that have been received by the Human Resource Manager may be considered for interview. The Human Resource Manager shall provide support to the Senior Management or the committee in screening applications for minimum qualifications. The Human Resource Manager shall be available to provide assistance in the development of interview questions. Interviews Selection will be on the basis of final short lists. The interviewing panel will consist of decision making staff within the organisation. The Human Resource Manager shall be available to provide assistance in the development of interview questions. The panel will include a technical person from the area in which the staff being interviewed falls.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 76

Hiring Process The Human Resource Manager shall review the selection process and recommendation for hire to ensure that the search was conducted in accordance with this policy. It is the responsibility of the Senior Management or chair of the committee to submit a recruitment report to the Human Resource Manager on the recruitment process. An offer of employment shall not be extended to any candidate before the Human Resource Manager’s review and approval of the process. Any offer of employment to a candidate above the pre-approved salary amount shall require prior written justification, including appropriate administrative, fiscal and the Human Resource Manager’s approval. The Human Resource Manager will coordinate with the committee to ensure that all unsuccessful applicants are informed when a candidate has accepted an offer of employment.

Assumptions and risks • •

Sustained donor funding that allows for the policy goal to be met. Highly qualified applicants for the desired posts.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 77

REST AND RELAXATION

Introduction IAS recognizes its full responsibility for the well-being of its staff members. In order for any programme to run successfully, there is a need for staff to be able to obtain complete rest and relaxation. However, in some relief aid and development programmes, working and living conditions are such that it is not possible for staff to achieve complete rest and relaxation within the locality. IAS has therefore created a Rest and Relaxation Policy, enabling staff to leave their hostile working environment for some days to regain their maximum momentum.

Objectives Goal The goal of this policy is to provide adequate opportunities for complete rest and relaxation for IAS staff in order to maintain their well-being and, in turn, to run successful and effective programmes. It’s a long term responsibility for IAS to keep its employees sound and running at full potential. Purpose The purpose of the policy is to provide eligible staff members with an opportunity to leave the programme where they are based on a regular basis, in order to recover, both mentally and physically, from the stressful environment in which they work. Outputs The results that should be achieved through the policy is successfully completed rest and relaxation for all staff working in the environments where the rest and relaxation policy is applicable.

Activities and ways of implementation The activities in this policy are limited to transport of staff to and from the various places of work. However, there are a few guidelines needed for the implementation of this policy, see below. Authority for Rest and Relaxation (R&R) Leave The Country Representative, in liaison with the Director, has the overall responsibility for deciding which Operational Areas are eligible for staff to take R&R leave. He/she will review the list of locations on an annual basis based on the security situations in those areas, and frequently on a monthly basis as per the information received in advance from each Field Coordinator. The list of locations eligible for R&R leave during the following year shall be well known by the Field Coordinator before the beginning of each year. Should a programme’s working and living conditions change significantly during the year, the Country Representative, still in liaison with the Director, has the authority to authorize International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 78

additional R&R leave for eligible staff within that programme. Individual Field Coordinators are responsible for ensuring each eligible staff member receives their R&R entitlement. Responsibility for planning R&R leave within the programme may be delegated to another member of staff by the Country Representative. Staff will be consulted before any changes are made to the R&R policy, except in emergency situations where consultation is not possible before such changes are required. Field Coordinators are responsible for reporting change of security to the Country Representative to effect changes Eligibility for Rest and Relaxation Leave The Country Representative will publish, on a monthly basis, a list of locations and those staff working within such areas eligible for R&R leave. Rest and Relaxation Leave Entitlements Members of staff in this category are entitled to 10 working days of R&R leave after 8 weeks of continuous service. They are also entitled to 2 week ends which should cater for their travel at the beginning and end of each R&R leave period. R&R is leave provided by the organisation as a response to the working and living conditions experienced by staff in certain locations. It is therefore not connected to salary or annual leave entitlements and, as such, cannot be accumulated, exchanged for a monetary value or transferred to another member of staff. Timing of Rest and Relaxation Leave Staff will be advised of the date and length of their R&R leave entitlement at least three week(s) in advance of travel. Staff may request an alternative date for their R&R leave, which may be authorized by the Field Coordinator after giving due consideration to the effect of such a change on the programme’s operations and other staff members. No R&R leave may be taken within 4 weeks of the end of service of a particular contract. Any R&R leave due within this period will be forfeited. R&R leave may be taken in conjunction with annual leave and a public holiday(s) if authorized by the Field Coordinator. Cancellation of Rest and Relaxation Leave The Field Coordinator has the authority to postpone R&R leave in the event of circumstances requiring an emergency response from the organisation or in the event of a security threat. In such a situation, staff will continue to accrue R&R leave, which will be rescheduled as soon as possible. Location of Rest and Relaxation Leave The Country Representative is responsible for accepting the location(s) for staff R&R leave, based on the following: • • •

Ease of transportation, cost and provision of an environment appropriate for R&R (in the case of International Staff or International Volunteers from any given country). The Head office of each country will arrange travel to and from the R&R location. International or Volunteer Staff may request an alternative location for personal reasons not later than 3 weeks before travel. This may be authorized by the Country Representative. The individual staff member is liable for any additional costs incurred in travelling to, or staying at an alternative location and may be helped by the Head Office for their bookings and arrangements.

Accommodation for Rest and Relaxation Leave The Head Office of each particular country will be responsible for booking accommodation of a reasonable standard. Should a member of staff wish to stay in alternative accommodation, they should communicate their request to the same office not later than 3 weeks before travel. They will be personally liable for any additional costs incurred.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 79

Expense Allowance during Rest and Relaxation Leave Staff will be entitled to travel expenses but will not be entitled to any other allowance of their R&R leave to cover expenses such as meals. Such expenses incurred will be the responsibility of the individual.

Assumptions and risks There are two major assumptions and risks with the implementation of this policy: • •

Sustained security access to and within project areas is assured. Sustained donor funding that allows the policy goal to be met.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 80

STAFF HEALTH

Introduction IAS will aim to have information on education and prevention programmes developed for the staff for diseases of primary health care, HIV/AIDS and sexually transmitted diseases. These programmes will be developed in line with National Health Development Programmes of each country where IAS operates.

Objectives Goal The goal of this policy is to meet the basic health needs of IAS staff. Purpose The purpose is to meet the basic health need when sickness occurs. Outputs A vibrant staff while at work.

Activities and ways of implementation Pre-employment Medical examinations Because IAS is not and has no intention of being seen as a discriminatory organisation, HIV testing or the testing for similar life-threatening conditions will not be made a compulsory preemployment requirement. It will however remain the informed choice of the employee to have this test taken and the findings will remain confidential between the employee and the Human Resource Manager. As the organisation promotes openness in HIV/AIDS related issues, the organisation recommends dialogue between the employee and their immediate supervisor but this will be done only with the consent of the employee in question. Employment Medical examinations All IAS staff will have a routine medical examination held in confidence at the beginning of a new contract. The test will comprise of a health questionnaire to be filled by the employee, a medical examination to be carried out by a qualified medical person and routine blood, urine and stool examinations. This will be carried out in liaison with the health coordinator and the respective administrator. The employee will be advised on the results and should the need arise, be counselled on the implications of the findings. These findings will not be used to affect the tenure of one’s contract, the availability of training or the security of one’s job. Should the need arise; at the discretion of the health coordinator, the results will be communicated to the immediate superior. Leakage of this information is criminal, a breach of professional ethics and a violation of one’s right to confidence and must not be encouraged lest there be legal ramifications.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 81

Out-patient care Outpatient care is a right for all employees. Therefore, outpatient care will be the responsibility of the employee and the organisation will not be obliged to meet these costs for the employee or their dependants. Staff insurance IAS has recognised that emergency admission to a medical facility may be inevitable and sudden. This may occur at a time when one has no sufficient funds to meet the costs. The organisation will pay 50% of the costs for any reputable company that can insure staff. A deduction of 50% of the insurance fee will be effected. This will be built in to any new contract a staff signs with the organisation. In-patient care will be provided at any one of the hospitals that have been certified by the various insurance companies or authorized by the IAS Head Office. The maximum amount IAS will pay for in-patient medial treatment is USD 500 per year. Chronic illness Any person with a chronic illness will be entitled to in-patient and out-patient care as laid down in the health policy above. The organisation will not be obliged to keep any employee whose illness is affecting the productivity and effectiveness of that particular member of staff. This will however be done in all fairness and in liaison with all parties and as per IAS Employment Policy.

Assumptions and risks • •

Sustained donor funding. Highly committed and healthy IAS staff.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 82

STAFF TRAINING AND DEVELOPMENT

Introduction IAS regards its employees as its most important asset, and is committed to ensuring that all staff are trained to carry out their current jobs and are also equipped in good time to perform future roles. IAS encourages and supports staff in the overall context of meeting its goals and objectives.

Objectives The goal and purpose of this policy is to outline IAS´ commitment to the training and developments of staff and to support staff attain their maximum potential. It contains guidance into the procedure for and activities designed to support such training and development. This policy applies to exclusively all employees of IAS.

Activities and ways of implementation Responsibilities Education department The Human Resource function is responsible for the communication, administration and information, including preparing budgets, designing training programmes, interpretation of this policy and also developing manuals to be used for in-house training at IAS. Examples of specific tasks under this responsibility include: • • • • • •

Following up applications and other arrangements. Facilitating the provision of visas and transport by reasonable means. Providing medical insurance when required by the institution. Providing other specified requirements accordingly. Keeping copies of certificates until reports from the trainee have been submitted. Keeping updated files of institutions and will be responsible to secure funding for the training.

The Individual Basing on the assessment of training needs identified from staff performance appraisals, the supervisor should take the lead in identifying areas of training for each individual staff member. It is also the responsibility of each individual to identify personal training and development needs and seek assistance from IAS and see to it that he/she acquires the necessary knowledge, skills and ability to perform current and future roles. Line Managers/Supervisors The role of Line Managers/Supervisor is to:

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 83

• • • • •

Represent IAS when it comes to supporting the development of employees working under them. Encourage staff to learn. Work with team members to identify their development needs. Create and facilitate learning opportunities. Make the most effective use of training and development budgets.

Employee orientation programmes An employee orientation programme will be conducted for all new staff assisted by other IAS employees and departments. The programme will be designed to ensure that the common information required by all the employees is provided in a timely and consistent manner. The programme will consist of the following: • • • •

The structure and organisation including administrative issues of IAS. Operations of IAS may necessitate a sitting with each departmental head to gain a working exposure. A reading and understanding of all IAS policies. Any other information peculiar to IAS that may be found necessary to impart to a new employee.

Performance review and development plans IAS has an annual performance appraisal. During the appraisal, future objectives are identified and staff development is examined to identify possible training programmes which employees may require in order to assist them in their objectives. Forms of training in IAS In- House Learning This describes activities other than formal training. In- house learning is usually focused on “learning by doing” or self-initiated study, such as: • • • • • •

On the job coaching. Mentoring. Reading and research. Expert briefing. Team-based activities. Job rotation.

Such courses will specifically address issues unique to IAS, its history, policies, procedures, operations basic skills, and knowledge pertinent to the vision and mission of IAS. It is in these that staff will be introduced to new innovative ideas of operations, uniformity of operations will be streamlined, and skill and competences enhanced in house. External Training This describes formal training programmes. Courses might take place outside the premises of IAS in areas that might be identified as specifically equipped and designed for staff training. This form of training will be used to implant highly specialized knowledge or advanced skills and will broaden the horizons of staff taking part because it will expose them to peers from other organisations which will facilitate exchange of ideas and networking with potential new partners. Location of Learning Whether formal or informal training will be conducted in the following manner:

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 84

In-house learning This will be conducted on the job as described above. Each person’s manager/supervisor will be responsible for imparting to staff the way of doing things by coaching, mentoring, teaching, demonstrating, counselling, and any other means by which staff can learn how to do their jobs while on the job. External Training This will take place in a location external to IAS’ premises with the facilitation of external resource persons. IAS will sponsor staff to relevant courses that will assist them in acquiring managerial, team leading, technical and social knowledge and skills. External training will be useful in supplying staff with the quality of instruction that might be uneconomical to provide internally Nomination for training Each year the person in charge of the Human Resource function will design a programme containing all courses on offer whether external or internal. This programme will be forwarded to all line managers who will nominate the staff in their departments. Such nomination shall be forwarded to the Country Representative for approval. Staff in agreement with and through their supervisor/manager whether arising from the performance appraisal interview or in the course of performance of duty may request for a certain course that is not indicated in the programme. Approval shall be granted by the Country Representative in consultation with the person for the time being in charge of Human Resources provided that the course sought after shall be relevant to the employee’s job and in line with the goals and objectives of IAS. Full time studies Staff may engage in full time studies. This is when they are absent from the office studying full time at institutions of learning whether within or outside their country of operation. Priority Areas for Full Time Studies Staff development assistance/scholarships for full time studies or distance learning will be considered in the following areas: Organisational Core Needs These will look at the general and continuing need within the organisation as a whole that need improvement and to develop professional expertise. The subjects of study will encompass areas such as peace and conflict resolutions, humanitarian aid in complex emergencies, and the changing world international relations among others. These courses will be seen as being able to give more focus and direction to the organisation in view of the happenings in the relief/humanitarian/ NGO world. For most part the target trainees will be individuals at management level. Job Needs These will focus on the needs for particular jobs to be done well within the organisation. This is very vital especially at the sectors level and will seek to enhance the technical expertise within each sector and the organisation at large. For most part, the target trainees will be individuals involved as sector heads, project leaders, field coordinators, administrators, logisticians etc. Others This will be accorded to individuals that have shown exemplary abilities, commitment and initiatives in their job performances but lack or need improvement in one or two areas e.g. communication skills. The scope of trainees is wide ranging from team house leaders, secretaries, and receptionists to drivers, radio operators etc.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 85

Study leave At the discretion of the management study leave may be granted up to a maximum of one year. Once study leave is so granted, IAS will not be responsible to pay the salary of staff in the event that it will become necessary to fill the vacancy of the employee going to study. IAS will not support one’s family once they have taken study leave. Should the employee wish to take study leave and be accompanied by members of his family, IAS will not be in a position to fund such a move. Scholarship IAS may at its discretion offer scholarship whose extent will depend on availability of funds. Depending on factors to be determined by the Board, IAS may decide to retain a particular employee after his/her studies. Accordingly such an employee will be required to sign a bond promising to work for IAS for at least 3 years after the training or pay IAS a sum of money equivalent to the person’s three years salary or the amount of the scholarship whichever is more. Applications • Applications for full time studies will be done on standard application forms available from the Human Resource department. • All applications must be done in good time before the studies begin. Preferably, it should be done six months to a year before to enable IAS source the funds and find a replacement for the staff proceeding to study. • All applications must contain as much detail as possible to facilitate expeditious and informed decision-making. • Applications must be approved and recommended by one’s immediate supervisor and by the Country Representative. • Applications will only be considered if they are relevant to one’s job and are in conformity with the vision and mission of IAS. • Once approval to proceed for studies is received, IAS may assist the employee in making the necessary arrangements e.g. making travel arrangements and visa applications. Applicants Responsibilities Applicants will be responsible for the following: • • • • •



Give an account of any funds advanced to them by IAS; Give a periodical report on the progress of the studies; Give an evaluation of the course as per paragraph 11 below Pursue the training courses diligently and continue until successful completion of the course. If the employee gets sick or is unable to complete the studies due to circumstances beyond his or her control he must immediately inform IAS. Conduct himself at all times as an honest and faithful person and to the best of his power and ability faithfully observe, obey and perform such instructions, directions, rules and regulations as may from time to time be made or given to him by the trainers all the while bearing in mind that he/she is representing IAS in the institution of learning. Sit for and pass all examinations or assessments/evaluations fixed or set by the trainers unless prevented from so doing by the circumstances mentioned above.

Distance learning Distance learning programmes are considered a good option to full time studies. The distance learning programmes enable staff to continue their duties and at the same time pursue studies. This form of training is preferred for longer periods of training. Training evaluation system To maximize learning and development, a tripartite effort is essential at all stages, pre-course, end of course and post course. This involves the learner, his/her manager and the provider of training. The objectives and processes of each stage will be as follows: International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 86

Pre-course The purpose of pre-course evaluation is to determine the need for the training programme and the benefits expected to be gained. This has to be agreed by the nominated staff and his/her immediate supervisor/line manager. End of Course The purpose of this stage will be to: • • •

Help participants ascertain improvement areas and determine on action points. Help trainers obtain feedback regarding course conduct and participant training. Establish minimum standards for satisfactory course completion.

Post Course Evaluation The true test of training effectiveness must necessarily be reflected in job performance. Therefore, both the participant and immediate superior need to be in agreement on an action plan with precise, measurable, visible performance criteria. To do this, there should be a postcourse debrief and a joint action plan formulation. Discussion of the same periodically and impact on performance will be noted during the annual appraisal discussion. Staff library There is a need to develop staff libraries in each of the hubs of operation with one serving as the central distributing library. Books can be borrowed and have to be returned within the stated time limit. The officer in-charge is to search for relevant books spanning a range of subjects for example in professional, spiritual, personal development or general interest. The staff can also request for new titles. In addition to books, other publications will be available in the library e.g. the IAS manuals.

Assumptions and risks • •

Sustained donor funding that allows for the policy goal to be met. Highly committed IAS staff.

International Aid Services

POLICY HANDBOOK Version 1.0 – 2006 p. 87

Related Documents

Slideshow Oct06
November 2019 7
Slides Howl D Oct06
November 2019 3
Swip-an Handbook 17.pdf
November 2019 6
Mib 2006 Vancouver Oct06
October 2019 2

More Documents from ""