Tabel 4.1 Proyeksi Penduduk dengan Metoda Aritmatika NO Xi

Tahun

1

2005

2

2006

3

2007

4

2008

5

2009

6 7 8 9 10 55 a = b = Y' =

2010 2011 2012 2013 2014

Pendd (Yi) Yrata-rata

38292 38464 38827 39135 39439 40841.5 41643 42254 42627 43457 44277 408,415

Xi 2

Xi.Yi

Y'

(Yi - Y')

(Yi -Y' )2

1

38,292

37,586

706

498770

4

76,928

38,309

155

23944

9

116,481

39,033

-206

42336

16

156,540

39,756

-621

385957

25

197,195

40,480

-1041

1083164

36 49 64 81 100 385

249,858 295,778 341,016 391,113 442,770 2,305,971

41,203 41,927 42,650 43,374 44,097 408,415

440 327 -23 83 180 0

193381 107096 540 6932 32315 2374436

36862.27 723.50 45258.87 + 245.88.X

Tabel 4.2 Proyeksi Penduduk dengan Metoda Logaritma NO. Xi 1 2 3 4 5 6 7 8 9 10 55 a = b = Y' =

Tahun

Pendd (Yi)

ln Xi

ln Xi2

Yi ln Xi

Y'

(Yi-Y')

(Yi-Y')2

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457 44,277 408,415

0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10

0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65

0.00 26,661.21 42,655.82 54,252.63 63,474.62 74,614.24 82,222.49 88,640.35 95,484.79 101,951.56 629,957.71

36,759 38,632 39,728 40,506 41,109 41,602 42,019 42,379 42,698 42,983 408,415

1533 -168 -901 -1371 -1670 41 235 248 759 1294 0.00

2350166 28379 812486 1879496 2789151 1692 55453 61289 576407 1675572 10230091

36758.975 2702.8692 45156.48+ (963.11 x ln Xi)

Tabel 4.3 Proyeksi Penduduk dengan Metoda Eksponensial NO Xi 1 2 3 4 5 6 7 8 9

Tahun

Pendd (Yi)

Xi2

ln Yi

Xi ln Yi

Y'

(Yi -Y' )

(Yi -Y' )2

2005 2006 2007 2008 2009 2010 2011 2012 2013

38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457

1 4 9 16 25 36 49 64 81

10.55 10.56 10.57 10.57 10.58 10.64 10.65 10.66 10.68

10.55 21.11 31.70 42.30 52.91 63.82 74.56 85.28 96.12

37,672 38,342 39,025 39,720 40,428 41,148 41,880 42,626 43,385

620 122 -198 -585 -989 495 374 1 72

384961 14775 39319 342574 977492 245358 139526 0 5118

10 55 ln a = b = Y' =

2014

44,277 408,415

100 385

10.70 106.16

106.98 585.34

44,158 408,385

119 30

14133 2163256

10.519 0.018 10.720.e^0.005.X

Tabel 4.4 Proyeksi Penduduk dengan Metoda Geometri NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a= b = Y' =

Tahun

Pendd (Yi)

ln Xi

ln Xi2

ln Yi

ln Xi ln Yi

Y'

(Yi - Y' )

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457 44,277 408,415

0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10

0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65

10.55 10.56 10.57 10.57 10.58 10.64 10.65 10.66 10.68 10.70 106.16

0.00 7.32 11.61 14.66 17.03 19.06 20.73 22.17 23.47 24.63 160.67

36,903 38,637 39,689 40,452 41,054 41,553 41,980 42,352 42,684 42,983 408,288

1389 -173 -862 -1317 -1615 90 274 275 773 1294 127

10.516 0.066 EXP(10.718+ (0.021 x ln X))

Tabel 4.5 Proyeksi Jumlah Penduduk Tahun 2013- 2027 No

Tahun

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Proyeksi Penduduk Aritmatika LogaritmaEksponensialGeometrik 38,292 38,292 38,292 38,292 38,464 38,464 38,464 38,464 38,827 38,827 38,827 38,827 39,135 39,135 39,135 39,135 39,439 39,439 39,439 39,439 41,643 41,643 41,643 41,643 42,254 42,254 42,254 42,254 42,627 42,627 42,627 42,627 43,457 43,457 43,457 43,457 44,277 44,277 44,277 44,277 44,821 43,240 44,945 43,255 45,544 43,475 45,745 43,505 46,268 43,692 46,560 43,736 46,991 43,892 47,389 43,952 47,715 44,078 48,233 44,153 48,438 44,253 49,092 44,342 49,162 44,417 49,966 44,520 49,885 44,571 50,856 44,689 50,609 44,717 51,762 44,850 51,332 44,856 52,683 45,002

Tabel 4.7 Hasil Proyeksi Pe

Penduduk

No

38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457 44,277

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21 22 23 24 25 26 27 28 29 30 31 32

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

52,056 52,779 53,503 54,226 54,950 55,673 56,397 57,120 57,844 58,567 59,291 60,014

44,988 45,114 45,234 45,349 45,459 45,565 45,667 45,765 45,860 45,952 46,041 46,126

53,622 54,577 55,549 56,538 57,545 58,570 59,613 60,674 61,755 62,855 63,974 65,113

45,148 45,287 45,421 45,549 45,672 45,791 45,906 46,016 46,123 46,227 46,328 46,425

21 22 23 24 25 26 27 28 29 30 31

Tabel 4.9 Rekapitulasi Peningkatan Jumlah Pendu No. Tahapan Proyek Jumlah Penduduk Persen Pelayanan Jumlah yang terlayani 1 2010 44277 0.55 24352 2 2020 52683 0.7 36878 3 2030 62855 0.8 50284

Tabel 4.8 Standar Pemakaian Air Kota 1001 Malam Standar Kebutuhan No

Jenis Fasilitas

Air Tahap I Tahap II

Kapasitas

Keteranga n

Rumah Tangga 1

2

3

Sambungan rumah

130

130

L/jiwa/hari

- Hidran umum Sekolah

30

30

L/jiwa/hari

- TK - SD - SMP - SMU

20* 40 50 80

20* 40 50 80

L/jiwa/hari L/jiwa/hari L/jiwa/hari L/jiwa/hari

PT/Akadem i

80

80

L/jiwa/hari

Peribadatan

10

10

L/jiwa/hari

- Rumah Sakit

500

500

L/tt/hari

Puskesmas

350

350

- Klinik

350

350

L/tt/hari L/tt/hari

Kesehatan

4

*data asumsi

4

- Apotek

350

350

L/h/unit *data DPU tahun 2010

Industri* Industri Besar 5

Karyawan Pria

60

60

L/o/h

Karyawan wanita

100

100

L/o/h

Karyawan Pria

60

60

L/o/h

Karyawan wanita

100

100

L/o/h

- Pasar - Toko - Restoran

5 3 15

5 3 15

L/m2/h L/o/h L/o/h

Perkantoran Besar

100

100

L/jiwa/hari

100 100

100 100

L/jiwa/hari L/jiwa/hari

300 10

300 10

L/tt/h L/td/h

30

30

L/o/h

3

3

L/o/h

Industri Kecil

Perdaganga n 6

7

8

Menengah Kecil Lain-lain - Hotel - Bioskop -Stadion Olahraga* - Terminal bus

*data asumsi

Data standarpemakaian air

Tabel 4.11 Rekapitulasi Kebutuhan Air Domestik Kota 1001 Malam Tahun Tahun Awal (2010) Jenis Sambungan SR HU Sambungan (%) 0.82 0.18 Jumlah Penduduk Yang Terlayani (Jiwa) 24352 Jumlah Pengguna (Jiwa) 19888 4465 Standar Kebutuhan Air (L/o/h) 130 30 Kebutuhan Air (L/det) 29.92 1.55 Total 31.47

Tahap I (2020) SR HU 0.82 0.18 36878 30117 6761 130 30 45.32 2.35 47.66

Tahap II (2030) SR HU 0.85 5.01 50284 42741 251921 130 30 64.31 87.47 151.78

Tabel 4.10 Jenis Pemukiman Penduduk Kota 100 No.

Jenis Rumah

1 2 3

Permanen Semi Perman Non perman

2010 65 25 10

Persen Jenis 2020 55 40 5

2030 65 30 5

Tabel 4.12 Rekapitulasi Penambahan Fasilitas Perkotaan K Jumlah No.

Jenis Fasilitas

Kapasitas

Data Awal (2009)

*Tahap I (2019)

*Tahap II (2029)

100 jiwa/unit 600 jiwa/unit 800 jiwa/unit 800 jiwa/unit 1500 jiwa/unit

23

30

35

30

35

40

1

Sekolah a. TK b. SD c. SMP d. SMU e. PT/Ak ademi

24

25

30

12

25

30

9

15

18

SOAL 18 25 19 7

4

Peribadatan - Mesjid

400 jiwa/unit 100 jiwa/unit 400 jiwa/unit

41

45

50

37

40

44

10

14

16

- Rumah 300 tt/unit Sakit 40 tt/unit Puskesmas

10

13

16

17

27

31

2 - Mushalla - Gereja

36 32 5

Kesehatan

3

4

- Klinik - Apotik Industri - Industri Besar - Industri Kecil

15 tt/unit 5 tt/unit

13 14

23 25

30 29

2 Ha/Unit

9

15

23

200 m2/Unit

17 23

30

5

12 8 9

4 12

Perdaganga n - Pasar

700 m2/unit

8

16

20

- Toko

50 m2/unit

255

305

330

5

3 250

- Restauran 50 m /unit 2

31

45

54 26

Perkantoran

6

- Kantor besar

1000 m2/unit

13

20

25

- Kantor Menengah

600 m2/unit

19

30

37

8

14 - Kantor kecil Lain-Lain - Hotel - Bioskop 7 - Stadion Olahraga - Terminal bus

300 m2/unit

25

35

43

50 tt/Unit

11

20

26

500 td/Unit 4 Ha

7

10

12

2

6

9

200 unit bus/Hari

2 6

10

20

6 2 1 1

Tabel 4.13 Rekapitulasi Kebutuhan Air Untuk Sarana Pendidikan No. 1 2 3 4 5

Jumlah (unit)

Sarana Pendidika n TK SD

Tahun Awal 23 30

SMP/MTS N SMU

24 12

PT/Akadem i

9

Tahap I

Tahap II

30 35 25

35 40 30

25 15

30 18

Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (jiwa/unit) an Air Tahun Awal (L/o/h) 20 0.53 100 40 8.33 600 800 800 1500

50 80

11.11 8.89

80

12.50 41.37

Kebutuhan Total

Tabel 4.14 Rekapitulasi Kebutuhan Air Untuk Sarana Peribadatan No. 1 2 3

Sarana Peribadata n Mesjid Mushalla Gereja

Jumlah (unit) Tahun Awal 41 37 10

Tahap I

Tahap II

45 40 14

50 44 16

Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (jiwa/unit) an Air Tahun Awal (L/o/h) 400 10 1.90 100 10 0.43 400 10 0.46

Kebutuhan Total

2.79

Tabel 4.15 Rekapitulasi Kebutuhan Air untuk Sarana Kesehatan No.

Sarana Kesehatan

Jumlah (unit) Tahun Awal

1

Rumah sakit

10

2 3 4

Puskesmas Klinik Apotek

17 13 14

Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (tt/unit) an Air Tahun Awal (L/tt/h) 300 500 17.36

Tahap I

Tahap II

13

16

27

31

40

23 30 25 29 Kebutuhan Total

15 5

350 350 350

2.75 0.79 0.28 21.19

Tabel 4.16 Rekapitulasi Kebutuhan Air untuk Sarana Perind Kriteria 2010 2020 Jumlah (unit) 2030 Kapasitas (m2/unit) P 2010 W Jumlah P 2020 Karyawa W n P 2030 W P Standar Kebutuhan Air (l/jiwa/hr) W P 2010 W Kebutuh P 2020 an Air W (l/dtk) P 2030 W

Industri Industri Kecil Besar 9 17 15 23 23 30 20000 200 720 27 1080 41 1200 37 1800 55 1840 48 2760 72 60 60 Kebutuhan Total 100 100 0.50 0.02 1.82 1.25 0.05 0.83 0.03 3.01 2.08 0.06 1.28 0.03 4.59 3.19 0.08 9.41

Tabel 4.17 Rekapitulasi Kebutuhan Air untuk Sarana Perdagangan No. 1 2 3

Sarana Perdagang an Pasar Toko Restoran

Jumlah (unit) Tahun Awal 8 255 35

Tahap I

Tahap II

16 20 305 330 45 54 Kebutuhan Total

Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (m2/unit) an Air Tahun Awal (L/m2/h) 5 0.32 700 3 0.44 50 15 0.30 50 1.07

Tabel 4.18 Rekapitulasi Kebutuhan Air untuk Sarana Perkantoran No.

Sarana Perkantor an

Jumlah (unit)

Standar Kapasitas Kebutuh (m2/unit) an Air (L/o/h)

Kebutuhan Air (L/det)

1

Sarana Perkantor an Besar

2 3

Menengah Kecil

No.

Tahun Awal

Tahap I

Tahap II

13 19

20 30

25 37

25

35 43 Kebutuhan Total

Standar Kapasitas Kebutuh (m2/unit) an Air Tahun Awal (L/o/h) 100 1.50 1000 600 300

100 100

1.32 0.87 3.69

Tabel 4.19 Rekapitulasi Kebutuhan Air untuk Sarana Lain-lain No. 1 2

Sarana fasilitas

3

Hotel Bioskop Stadion Olahraga

4

Terminal Bus

Jumlah (unit) Tahun Awal 11 7 2

Tahap I

Tahap II

20 10 6

26 12 9

200 2

6 10 Kebutuhan Total

Tabel 4.20 Rekapitulasi Kebutuhan Air Kota 10 No.

1.

Parameter

2010 Kebutuhan Domestik Jumlah pend 44277 % Pelayanan 0.55

3

62855 0.8 2030 64.31 87.47 151.78

41.37 2.79

61.34 3.19

73.03 3.56

Kesehatan Industri Perdaganga n

21.19 1.82

28.85 3.01

35.21 4.59

1.07

1.57

1.85

Perkantoran Sarana lainnya TOTAL

3.69

5.61

6.96

2.73 74.65

5.30 108.87

7.15 132.36

Kebutuha n Total (l/det)

106.13

156.54

284.14

Peribadatan

2.

Tahun Desain 2020 2030

52683 0.7 Tahun Desain Parameter 2010 2020 Sambungan R 29.92 45.32 Hidran Umum 1.55 2.35 TOTAL 31.47 47.66 Kebutuhan Non Domestik (l/det) Pendidikan

Standar Kebutuhan Air (L/det) Kebutuh Kapasitas an Air (L/o/h) Tahun Awal 300 1.91 50 10 0.41 500 40000 30 0.28 3

0.14 2.73

4 5

Kebocoran (20%) 21.23 Kebutuhan ra127.35

31.31 187.84

56.83 340.97

Tabel 4.21 Rekapitulasi Qmd dan Qp Tahap I II

TahunQ rata-rata (l/dt) Q md (l/dt) 2020 2030

187.84 340.97

225.41 409.16

Q p (l/dt) 281.77 511.45

656.17

Metoda Aritmatika

Proyeksi Penduduk Kota Dre (Yi-Yrata)2

S

-2550

6,499,950

2005

-2378

5,652,506

2006

-2015

4,058,210

2007

-1707

2,912,142

2008

-1403

1,967,006

802 1413 1786 2616 3436

642,402 1,995,156 3,188,010 6,840,840 11,802,660 45,558,885

513.64

R

Tahun Aritmatika Jumlah Penduduk

0.97

2009 2010 2011 2012 2013 2014

JumlahPenduduk

(Yi-Yrata)

38292 125000 38464 38309 37586

38827 39033 120000 39135 39756 115000 39439 40480 110000 41643 41203 41927 105000 42254 42650 42627 100000 43374 43457 44097 95000 44277 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

gan Metoda Logaritma Yrata-rata

40841.5

(Yi-Yrata)

(Yi-Yrata)2

-2549.5 -2377.5 -2014.5 -1706.5 -1402.5 801.5 1412.5 1785.5 2615.5 3435.5

6,499,950 5,652,506 4,058,210 2,912,142 1,967,006 642,402 1,995,156 3,188,010 6,840,840 11,802,660 45,558,885

S

R

x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

1066.15

0.88

S

R

x

0.98

2005 2006 2007 2008 2009 2010 2011 2012 2013

Logaritmatik Jumlah Penduduk 36759 38632 39728 40506 41109 41602 42019 42379 42698 42983

38292 38464 38827 39135 39439 41643 42254 42627 43457 44277

engan Metoda Eksponensial Yi rata-rata (Yi -Yrata)

40841.5

-2549.50 -2377.50 -2014.50 -1706.50 -1402.50 801.50 1412.50 1785.50 2615.50

(Yi -Yrata)2 6,499,950.25 5,652,506.25 4,058,210.25 2,912,142.25 1,967,006.25 642,402.25 1,995,156.25 3,188,010.25 6,840,840.25

490.26

Eksponensial Jumlah Penduduk 37672 38342 39025 39720 40428 41148 41880 42626 43385

38292 38464 38827 39135 39439 41643 42254 42627 43457

3435.50

11,802,660.25 45,558,884.50

2014

dengan Metoda Geometri (Yi - Y')2 1,928,004 29,954 742,482 1,734,778 2,609,437 8,080 75,344 75,399 597,405 1,674,517 9,475,400

Yrata-rata

40841.5

Yi-Yrata

(Yi-Yrata)2

-2549.50 -2378 -2015 -1707 -1403 802 1413 1786 2616 3436 0

6,499,950 5,652,506 4,058,210 2,912,142 1,967,006 642,402 1,995,156 3,188,010 6,840,840 11,802,660 45,558,885

S

R

1025.98

0.89

44158

44277

x

Geometri

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

36903 38637 39689 40452 41054 41553 41980 42352 42684 42983

Tabel 4.7 Hasil Proyeksi Penduduk dengan Metode Terpilih Penduduk

Eksponensial

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

38292 38464 38827 39135 39439 41643 42254 42627 43457 44277

38292 38464 38827 39135 39439 41643 42254 42627 43457 44277 44945 45745 46560 47389 48233 49092 49966 50856 51762 52683

180000 Jumlah Penduduk

Tahun

170000

160000

150000

140000

130000

120000

110000

100000 2000 2005 2010 2015 2020 2025 2030 2035 Tahun

120000

110000

53622 54577 55549 56538 57545 58570 59613 60674 61755 62855 63974

100000 2000 2005 2010 2015 2020 2025 2030 2035 Tahun

REKAPITULASI PROYEKSI PE 190000

Penduduk

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

170000

f(x) = 2718.719893212x - 53543 R² = 0.9935089654

150000

130000

No

Tahun 1 2

2003 2004

3

2005

4

2006

5 6

2007 2008

7 8 9 10

2009 2010 2011 2012

11

2013

12

2014

13

2015

14

2016

15

2017

16

2018

Penduduk 43,423 43,523

110000

43,623 43,823

90000

43,923 44,123 44,723 44,923 45,123 45,323 45,520 45,756 45,992 46,230 46,469 46,722

Tahun

17

2019

46,959 47,196

18

2020

19

2021

20

2022

21

2023

22

2024

23

2025

24

2026

25

2027

230.92

47,433 47,670 47,913 48,153 48,392 48,632 48,872

X=

5

Y=

1

Z=

2

1

Kebutuhan Air (L/det) Tahap I

Tahap II

0.69 9.72

0.81 11.11

11.57 18.52

13.89 22.22

20.83 61.34

25.00 73.03

Kebutuhan Air (L/det) Tahap I 2.08 0.46 0.65

Tahap II 2.31 0.51 0.74

175.74

3.19

3.56

9.55

Kebutuhan Air (L/det) Tahap I

Tahap II

22.57

27.78

4.38 1.40 0.51 28.85

5.02 1.82 0.59 35.21

85.25

Kebutuhan Air (L/det) Tahap I

Tahap II

0.65 0.53 0.39 1.57

0.81 0.57 0.47 1.85

Kebutuhan Air (L/det)

4.49

Tahap I

Tahap II

2.31

2.89

2.08 1.22 5.61

2.57 1.49 6.96

16.26

Kebutuhan Air (L/det) Tahap I

Tahap II

3.47 0.58

4.51 0.69

0.83

1.25

0.42 5.30

0.69 7.15

15.19

Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Aritmatika

125000 120000 115000 110000 Column Q

105000

Column R

100000 95000

JumlahPendudukk

90000 2004 2006 2008 2010 2012 2014 2016 Tahun

0 -1142.277 -2431.399 -3279.572 -3632.882 2573.1372 5348.5249 7720.6397 12627.1 18214.671 35997.943

Proyeksi Penduduk KotaDream Island Tahap II dengan Metode Logaritma 125000 120000 115000 110000 105000

Column Q Column R

100000 95000 90000 2004200620082010201220142016 Tahun

Jum lahPenduduk

Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Eksponensial 125000 120000 115000 110000 105000 100000 95000 90000 2004 2006 2008 2010 2012 2014 2016

Column Q Column R

115000 110000 Column Q

105000

Column R

100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

Jumlah Penduduk

JumlahPenduduk

38292 38464 38827 39135 39439 41643 42254 42627 43457 44277

Proyeksi Penduduk Kota Drea Island Tahap II dengan Metode Geometri 125000 120000 115000 110000 Column R

105000 100000 95000 90000 2004200620082010201220142016 Tahun

15 2020 2025 2030 2035 2040 Tahun

Column S

15 2020 2025 2030 2035 2040 Tahun

REKAPITULASI PROYEKSI PENDUDUK TAHUN 2005-2035

00

00

f(x) = 2718.719893212x - 5354363.87055883 R² = 0.9935089654

00

Penduduk

00

Linear (Penduduk)

00

00

Tahun

3549

Tabel 4.6 Perbandingan Metode Proyeksi Penduduk Metode Aritmatik

S 513.64

R 0.97

Logaritma 1066.15

0.88

Eksponensial 490.26

0.98

Geometri

1025.98

0.89

Tabel 4.1 Proyeksi Penduduk dengan Metoda Aritmatika NO Xi

Tahun Pendd (Yi)Yrata-rata

1

2005

2

2006

3

2007

4

2008

5

2009

6 7 8 9 10 55 a = b = Y' =

2010 2011 2012 2013 2014

22593 22852 23411 23893 24359 24565.2 24665 25253 25446 26342 26838 245,652

Xi 2

Xi.Yi

Y'

(Yi - Y')

(Yi -Y' )2

1

22,593

22,460

133

17728

4

45,704

22,928

-76

5732

9

70,233

23,396

15

238

16

95,572

23,863

30

875

25

121,795

24,331

28

769

36 49 64 81 100 385

147,990 176,771 203,568 237,078 268,380 1,389,684

24,799 25,267 25,735 26,203 26,671 245,652

-134 -14 -289 139 167 0

17990 195 83426 19407 28041 174402

21992.00 467.85 45258.87 + 245.88.X

Tabel 4.2 Proyeksi Penduduk dengan Metoda Logaritma NO. Xi 1 2 3 4 5 6 7 8 9 10 55 a = b = Y' =

Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342 26,838 245,652

ln Xi

ln Xi2

Yi ln Xi

Y'

(Yi-Y')

(Yi-Y')2

0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10

0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65

0.00 15,839.80 25,719.61 33,122.73 39,204.30 44,193.75 49,140.07 52,913.47 57,879.29 61,796.78 379,809.80

21,827 23,084 23,819 24,340 24,745 25,075 25,355 25,597 25,810 26,001 245,652

766 -232 -408 -447 -386 -410 -102 -151 532 837 0.00

586804 53617 166144 199932 148740 168258 10332 22717 282760 700146 2339452

21826.969 1812.8685 45156.48+ (963.11 x ln Xi)

Tabel 4.3 Proyeksi Penduduk dengan Metoda Eksponensial NO Xi 1 2 3 4 5 6 7 8 9

Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013

22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342

Xi2

ln Yi

Xi ln Yi

Y'

(Yi -Y' )

(Yi -Y' )2

1 4 9 16 25 36 49 64 81

10.03 10.04 10.06 10.08 10.10 10.11 10.14 10.14 10.18

10.03 20.07 30.18 40.33 50.50 60.68 70.96 81.15 91.61

22,515 22,948 23,389 23,838 24,296 24,763 25,238 25,723 26,217

78 -96 22 55 63 -98 15 -277 125

6044 9178 499 3026 3975 9548 212 76897 15504

10 55 ln a = b = Y' =

2014

26,838 245,652

100 385

10.20 101.08

101.98 557.49

26,721 245,649

117 3

13652 138536

10.003 0.019 10.720.e^0.005.X

Tabel 4.4 Proyeksi Penduduk dengan Metoda Geometri NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a= b = Y' =

Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342 26,838 245,652

ln Xi

ln Xi2

ln Yi

ln Xi ln Yi

Y'

(Yi - Y' )

0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10

0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65

10.03 10.04 10.06 10.08 10.10 10.11 10.14 10.14 10.18 10.20 101.08

0.00 6.96 11.05 13.98 16.26 18.12 19.73 21.09 22.37 23.48 153.03

21,925 23,084 23,789 24,303 24,709 25,046 25,335 25,587 25,812 26,015 245,605

668 -232 -378 -410 -350 -381 -82 -141 530 823 47

9.995 0.074 EXP(10.718+ (0.021 x ln X))

Tabel 4.5 Proyeksi Jumlah Penduduk Tahun 2013- 2027 No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Proyeksi Penduduk Tahun AritmatikaLogaritmaEksponensialGeometrik 2005 22,593 22,593 22,593 22,593 2006 22,852 22,852 22,852 22,852 2007 23,411 23,411 23,411 23,411 2008 23,893 23,893 23,893 23,893 2009 24,359 24,359 24,359 24,359 2010 24,665 24,665 24,665 24,665 2011 25,253 25,253 25,253 25,253 2012 25,446 25,446 25,446 25,446 2013 26,342 26,342 26,342 26,342 2014 26,838 26,838 26,838 26,838 2015 27,138 26,174 27,235 26,199 2016 27,606 26,332 27,758 26,369 2017 28,074 26,477 28,291 26,527 2018 28,542 26,611 28,834 26,673 2019 29,010 26,736 29,388 26,810 2020 29,478 26,853 29,953 26,939 2021 29,946 26,963 30,528 27,060 2022 30,413 27,067 31,115 27,176 2023 30,881 27,165 31,713 27,285 2024 31,349 27,258 32,322 27,389

Tabel 4.7 Hasil Proyeksi

Penduduk

No

22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342 26,838

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21 22 23 24 25 26 27 28 29 30 31 32

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036

31,817 32,285 32,753 33,221 33,688 34,156 34,624 35,092 35,560 36,028 36,495 36,963

27,346 27,431 27,511 27,588 27,662 27,733 27,802 27,868 27,931 27,993 28,052 28,110

32,943 33,576 34,221 34,878 35,548 36,231 36,927 37,637 38,360 39,097 39,848 40,613

27,489 27,584 27,675 27,763 27,847 27,928 28,006 28,082 28,156 28,226 28,295 28,362

21 22 23 24 25 26 27 28 29 30 31

Tabel 4.9 Rekapitulasi Peningkatan Jumlah Pend No. Tahapan Proyek Jumlah Penduduk Persen Pelayanan Jumlah yang terlayani 1 2010 26838 0.55 14761 2 2020 32322 0.7 22625 3 2030 39097 0.8 31277

Tabel 4.8 Standar Pemakaian Air Kota 1001 Malam Standar Kebutuhan No

Jenis Fasilitas

Air Tahap I Tahap II

Kapasitas

Keterangan

Rumah Tangga 1

2

3

Sambunga n rumah

130

130

L/jiwa/hari

- Hidran umum Sekolah - TK - SD - SMP - SMU

30

30

L/jiwa/hari

20* 40 50 80

20* 40 50 80

L/jiwa/hari L/jiwa/hari L/jiwa/hari L/jiwa/hari

PT/Akade mi

80

80

L/jiwa/hari

Peribadata n

10

10

L/jiwa/hari

- Rumah Sakit

500

500

L/tt/hari

Puskesma s

350

350

- Klinik

350

350

L/tt/hari L/tt/hari

Kesehatan

4

*data asumsi

4

- Apotek

350

350

L/h/unit *data DPU tahun 2010

Industri* Industri Besar

5

Karyawan Pria

60

60

L/o/h

Karyawan wanita

100

100

L/o/h

Karyawan Pria

60

60

L/o/h

Karyawan wanita

100

100

L/o/h

- Pasar - Toko

5 3

5 3

L/m2/h L/o/h

- Restoran Perkantor an Besar

15

15

L/o/h

100

100

L/jiwa/hari

Menengah Kecil Lain-lain - Hotel

100 100

100 100

L/jiwa/hari L/jiwa/hari

300

300

L/tt/h

- Bioskop

10

10

L/td/h

-Stadion Olahraga*

30

30

L/o/h

- Terminal bus

3

3

L/o/h

Industri Kecil

Perdagang an 6

7

8

*data asumsi

Data standarpemakaian air

Tabel 4.11 Rekapitulasi Kebutuhan Air Domestik Kota 1001 Malam Tahun Tahun Awal (2010) Jenis Sambungan SR HU Sambungan (%) 0.82 0.18 Jumlah Penduduk Yang Terlayani (Jiwa) 14761 Jumlah Pengguna 12055 2706 Standar(Jiwa) Kebutuhan Air (L/o/h) 130 30 Kebutuhan Air (L/det) 18.14 0.94 Total 19.08

Tahap I (2020) SR HU 0.82 0.18 22625 18477 4148 130 30 27.80 1.44 29.24

Tahap II (2030) SR HU 0.85 5.01 31277 26586 156700 130 30 40.00 54.41 94.41

Tabel 4.10 Jenis Pemukiman Penduduk Kota 100 No.

Jenis Rumah

1 2 3

Permanen Semi Perm Non perma

2010 65 25 10

Persen Jenis 2020 55 40 5

2030 65 30 5

Tabel 4.12 Rekapitulasi Penambahan Fasilitas Perkotaan Kot Jumlah No.

1

Jenis Kapasitas Fasilitas Sekolah a. TK b. SD c. SMP d. SMU e. PT/A kade mi

Data Awal (2009)

*Tahap I (2019)

*Tahap II (2029)

23

30

35

30

35

40

24

25

30

12

25

30

9

15

18

SOAL 100 jiwa/unit 600 jiwa/unit 800 jiwa/unit 800 jiwa/unit 1500 jiwa/unit

18 25 19 7

4

Peribadata n - Mesjid 2

400 jiwa/unit 100 jiwa/unit

41

45

50

37

40

44

400 jiwa/unit

10

14

16

- Rumah 300 tt/unit Sakit 40 tt/unit Puskesma s

10

13

16

17

27

31

- Klinik - Apotik Industri - Industri Besar

15 tt/unit 5 tt/unit

13 14

23 25

30 29

2 Ha/Unit

9

15

23

Mushalla

36

32 - Gereja

5

Kesehatan

3

4

5

12 8 9

4

4 - Industri Kecil

200 m2/Unit

17

- Pasar

700 m2/unit

8

- Toko

50 m /unit

255

23

30

16

20

12

Perdagang an

5

2

3 305

330 250

50 m /unit Restauran 2

31

45

54 26

Perkantor an

6

- Kantor besar

1000 m2/unit

13

20

25

- Kantor Menengah

600 m2/unit

19

30

37

- Kantor kecil

300 m2/unit

25

35

43

50 tt/Unit

11

20

26

500 td/Unit 4 Ha

7

10

12

2

6

9

6

10

8

14 20

Lain-Lain - Hotel - Bioskop 7

- Stadion Olahraga - Terminal 200 unit bus bus/Hari

6 2 1

2 1

Tabel 4.13 Rekapitulasi Kebutuhan Air Untuk Sarana Pendidikan No. 1 2 3 4 5

Jumlah (unit)

Sarana Pendidik an TK SD

Tahun Awal 23 30

SMP/MT SN SMU

24 12

PT/Akade mi

9

Tahap I

Tahap II

Kapasitas (jiwa/unit)

30 35 25

35 40 30

100 600 800

25 15

30 18

800 1500

Standar Kebutuhan Air (L/o/h) 20 40

Kebutuhan Air (L Tahun Awal 0.53 8.33

50 80

11.11 8.89

80

12.50 41.37

Kebutuhan Total

Tabel 4.14 Rekapitulasi Kebutuhan Air Untuk Sarana Peribadatan No.

Sarana Peribadat an

Jumlah (unit)

Kapasitas (jiwa/unit)

Standar Kebutuhan Air (L/o/h)

Kebutuhan Air (L

No. 1 2 3

Sarana Peribadat an Mesjid Mushalla Gereja

Tahun Awal 41 37 10

Standar Kebutuhan Air (L/o/h)

Tahap I

Tahap II

Kapasitas (jiwa/unit)

45 40

50 44

400 100

10 10

1.90 0.43

400

10

0.46 2.79

14 16 Kebutuhan Total

Tahun Awal

Tabel 4.15 Rekapitulasi Kebutuhan Air untuk Sarana Kesehatan No.

Sarana Kesehata n

Jumlah (unit) Tahun Awal

1

Rumah sakit

10

2 3 4

Puskesma s Klinik Apotek

17 13 14

Tahap I

Tahap II

Kapasitas (tt/unit)

13

16

300

27

31

23 30 25 29 Kebutuhan Total

Standar Kebutuhan Air (L/tt/h)

Kebutuhan Air (L Tahun Awal

500

17.36

350 350 350

2.75 0.79 0.28 21.19

40 15 5

Tabel 4.16 Rekapitulasi Kebutuhan Air untuk Sarana Perindus Kriteria 2010 2020 Jumlah (unit) 2030 Kapasitas (m2/unit) P 2010 W Jumlah P 2020 Karyawa W n P 2030 W P Standar Kebutuhan Air (l/jiwa/hr) W P 2010 W Kebutuh P 2020 an Air W (l/dtk) P 2030 W

Industri Industri Kecil Besar 9 17 15 23 23 30 20000 200 720 27 1080 41 1200 37 1800 55 1840 48 2760 72 60 60 100 100 0.50 0.02 1.25 0.05 0.83 0.03 2.08 0.06 1.28 0.03 3.19 0.08

Kebutuhan Total 1.82 3.01 4.59 9.41

Tabel 4.17 Rekapitulasi Kebutuhan Air untuk Sarana Perdagangan No. 1 2

Sarana Perdagan gan Pasar Toko

Jumlah (unit) Tahun Awal

Tahap I

Tahap II

Kapasitas (m2/unit)

8 255

16 305

20 330

700 50

Standar Kebutuhan Air (L/m2/h) 5 3

Kebutuhan Air (L Tahun Awal 0.32 0.44

3

Restoran

35

45 54 Kebutuhan Total

15

50

0.30 1.07

Tabel 4.18 Rekapitulasi Kebutuhan Air untuk Sarana Perkantoran

1

Sarana Perkanto ran Besar

2 3

Menengah Kecil

No.

Jumlah (unit) Tahun Awal

Tahap I

Tahap II

Kapasitas (m2/unit)

13 19

20 30

25 37

1000 600

25

35 43 Kebutuhan Total

300

Standar Kebutuhan Air (L/o/h) 100 100 100

Kebutuhan Air (L Tahun Awal 1.50 1.32 0.87 3.69

Tabel 4.19 Rekapitulasi Kebutuhan Air untuk Sarana Lain-lain No. 1 2

Sarana fasilitas

3

Hotel Bioskop Stadion Olahraga

4

Terminal Bus

Jumlah (unit) Tahun Awal 11 7 2

Kapasitas Tahap I

Tahap II

20 10 6

26 12 9

1.

6 10 Kebutuhan Total

2.

Tahun Desain Paramete r 2010 2020 Kebutuhan Domestik Jumlah pen 26838 32322 % Pelayana 0.55 0.7 Tahun Desain Parameter 2010 2020 Sambungan 18.14 27.80 Hidran Umu 0.94 1.44 TOTAL 19.08 29.24 Kebutuhan Non Domestik (l/det) Pendidika n 41.37 61.34 Peribadata 2.79 3.19 n Kesehatan Industri Perdagang an Perkantor an

Tahun Awal

300 10

1.91 0.41

30

0.28

3

0.14 2.73

200 2

Tabel 4.20 Rekapitulasi Kebutuhan Air Kota 1 No.

50 500 40000

Kebutuhan Air (L

Standar Kebutuhan Air (L/o/h)

2030 39097 0.8 2030 40.00 54.41 94.41

73.03 3.56

21.19 1.82

28.85 3.01

35.21 4.59

1.07

1.57

1.85

3.69

5.61

6.96

2.

3

4 5

Sarana lainnya TOTAL

2.73 74.65

5.30 108.87

7.15 132.36

Kebutuh an Total (l/det)

93.73

138.12

226.77

Kebocora n (20%) 18.75 Kebutuhan 112.48

27.62 165.74

45.35 272.12

Tabel 4.21 Rekapitulasi Qmd dan Qp Tahap I II

TahunQ rata-rata (l/dt) Q md (l/dt) 2020 2030

165.74 272.12

198.89 326.55

Q p (l/dt) 248.61 408.18

550.34

a Aritmatika

Proyeksi P (Yi-Yrata)2

S

-1972

3,889,573

2005

22460

22593

-1713

2,935,054

2006

22928

22852

-1154

1,332,178

2007

23396

23411

-672

451,853

2008

23863

23893

-206

42,518

2009

24331

24359

100 688 881 1777 2273

9,960 473,069 775,809 3,157,018 5,165,620 18,232,652

2010 2011 2012 2013 2014

24799 25267 25735 26203 26671

24665

139.20

R

Tahun Aritmatika Jumlah Penduduk

1.00

JumlahPenduduk

(Yi-Yrata)

125000 120000 115000 110000 105000

25253 25446 26342 26838

100000 95000

90000 2004 2006 2008

Yrata-rata

24565.2

(Yi-Yrata) (Yi-Yrata)2 -1972.2 -1713.2 -1154.2 -672.2 -206.2 99.8 687.8 880.8 1776.8 2272.8

3,889,573 2,935,054 1,332,178 451,853 42,518 9,960 473,069 775,809 3,157,018 5,165,620 ###

S

509.84

R

0.93

x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Logaritmatik Jumlah Penduduk 21827 23084 23819 24340 24745 25075 25355 25597 25810 26001

22593 22852 23411 23893 24359 24665 25253 25446 26342 26838

JumlahPendudukk

etoda Logaritma 0 -823.1121 -1393.06 -1291.842 -534.1179 320.39812 2604.4003 3808.6471 8578.0277 12050.154 23319.495

Proyeksi P 125000 120000 115000 110000 105000 100000 95000

90000 20042006200

Metoda Eksponensial

24565.2

(Yi -Yrata) (Yi -Yrata)2 -1972.20 -1713.20 -1154.20 -672.20 -206.20 99.80 687.80 880.80 1776.80

### ### ### ### 42,518.44 9,960.04 ### ### ###

S

124.07

R

x

1.00

2005 2006 2007 2008 2009 2010 2011 2012 2013

Proyeksi P

Eksponensial Jumlah Penduduk 22515 22948 23389 23838 24296 24763 25238 25723 26217

22593 22852 23411 23893 24359 24665 25253 25446 26342

Jum lahPenduduk

Yi rata-rata

125000 120000 115000 110000 105000 100000 95000

90000 2004 2006 200

115000 110000 105000

2272.80

### ###

2014

26721

100000

26838

95000

90000 2004 2006 200

an Metoda Geometri (Yi - Y')2 445,980 53,609 143,106 168,170 122,670 145,261 6,650 19,900 281,011 677,850 2,064,209

x Yrata-rata

24565.2

Yi-Yrata (Yi-Yrata)2 -1972.20 -1713 -1154 -672 -206 100 688 881 1777 2273 0

3,889,573 2,935,054 1,332,178 451,853 42,518 9,960 473,069 775,809 3,157,018 5,165,620 ###

S

R

478.89

0.94

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Geometri Jumlah Penduduk 21925 23084 23789 24303 24709 25046 25335 25587 25812 26015

22593 22852 23411 23893 24359 24665 25253 25446 26342 26838

abel 4.7 Hasil Proyeksi Penduduk dengan Metode Terpilih 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

180000

Penduduk Eksponensial 22593 22852 23411 23893 24359 24665 25253 25446 26342 26838

22593 22852 23411 23893 24359 24665 25253 25446 26342 26838 27235 27758 28291 28834 29388 29953 30528 31115 31713 32322

Jumlah Penduduk

Tahun

170000

160000

150000

140000

130000

120000

110000

100000 2000 2005 2010 2015 2020 2025 2030 2035 2040 Tahun

120000

110000

32943 33576 34221 34878 35548 36231 36927 37637 38360 39097 39848

100000 2000 2005 2010 2015 2020 2025 2030 2035 2040 Tahun

REKAPITULASI PROYEKSI PENDU 190000

Penduduk

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

170000

f(x) = 2718.719893212x - 5354363.870 R² = 0.9935089654

150000

P

No

Tahun 1 2

2003 2004

3

2005

Penduduk

130000

L

43,423 43,523 43,623

110000

43,823 4

2006

5 6 7 8 9 10

2007 2008 2009 2010 2011 2012

11

2013

12

2014

13

2015

14

2016

15

2017

16

2018

90000 43,923 44,123 44,723 44,923 45,123 45,323

Tahun

45,520 45,756 45,992 46,230 46,469 46,722

3549

17

2019

18

2020

19

2021

20

2022

21

2023

22

2024

23

2025

24

2026

25

2027

142.73

46,959 47,196 47,433 47,670 47,913 48,153 48,392 48,632 48,872

X=

5

Y=

1

Z=

2

1

Kebutuhan Air (L/det) Tahap I

Tahap II

0.69 9.72

0.81 11.11

11.57 18.52

13.89 22.22

20.83 61.34

25.00 73.03

Kebutuhan Air (L/det)

175.74

Tahap I

Tahap II

2.08 0.46

2.31 0.51

0.65 3.19

0.74 3.56

9.55

Kebutuhan Air (L/det) Tahap I

Tahap II

22.57

27.78

4.38 1.40 0.51 28.85

5.02 1.82 0.59 35.21

Kebutuhan Air (L/det) Tahap I

Tahap II

0.65 0.53

0.81 0.57

85.25

0.39 1.57

0.47 1.85

4.49

Kebutuhan Air (L/det) Tahap I

Tahap II

2.31

2.89

2.08 1.22 5.61

2.57 1.49 6.96

16.26

Kebutuhan Air (L/det) Tahap I

Tahap II

3.47 0.58

4.51 0.69

0.83

1.25

0.42 5.30

0.69 7.15

15.19

JumlahPenduduk

Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Aritmatika

125000 120000 115000 110000 Column Q

105000

Column R

100000 95000

JumlahPendudukk

90000 2004 2006 2008 2010 2012 2014 2016 Tahun

Proyeksi Penduduk KotaDream Island Tahap II dengan Metode Logaritma 125000 120000 115000 110000 105000

Column Q Column R

100000 95000 90000 2004200620082010201220142016 Tahun

Jum lahPenduduk

Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Eksponensial 125000 120000 115000 110000 105000 100000 95000 90000 2004 2006 2008 2010 2012 2014 2016

Column Q Column R

115000 110000 Column Q

105000

Column R

100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

mlah Penduduk

JumlahPenduduk

Proyeksi Penduduk Kota Drea Island Tahap II dengan Metode Geometri 125000 120000 115000 110000 Column R

105000 100000 95000 90000 2004200620082010201220142016 Tahun

2025 2030 2035 2040

Column S

2025 2030 2035 2040

ULASI PROYEKSI PENDUDUK TAHUN 2005-2035

2718.719893212x - 5354363.87055883 0.9935089654

Penduduk Linear (Penduduk)

Tahun

Tabel 4.6 Perbandingan Metode Proyeksi Penduduk Metode Aritmatik

S 139.20

R 1.00

Logaritma

509.84

0.93

Eksponensial 124.07

1.00

Geometri

478.89

0.94

Tabel 4.1 Proyeksi Penduduk dengan Metoda Aritmatika NO Xi

Tahun Pendd (Yi)Yrata-rata

1

2005

2

2006

3

2007

4

2008

5

2009

6 7 8 9 10 55 a = b = Y' =

2010 2011 2012 2013 2014

40390 40912 42040 43017 44007 44553.5 44928 46062 46342 48461 49376 445,535

Xi 2

Xi.Yi

Y'

(Yi - Y')

(Yi -Y' )2 (Yi-Yrata)

1

40,390

40,046

344

118486

-4164

4

81,824

41,047

-135

18359

-3642

9

126,120

42,049

-9

85

-2514

16

172,068

43,051

-34

1151

-1537

25

220,035

44,053

-46

2083

-547

36 49 64 81 100 385

269,568 322,434 370,736 436,149 493,760 2,533,084

45,054 46,056 47,058 48,060 49,061 445,535

-126 6 -716 401 315 0

15966 35 512352 161200 99088 928806

375 1509 1789 3908 4823

39044.07 1001.72 45258.87 + 245.88.X

Tabel 4.2 Proyeksi Penduduk dengan Metoda Logaritma NO. Xi 1 2 3 4 5 6 7 8 9 10 55 a = b = Y' =

Tahun

40390

ln Xi

ln Xi2

Yi ln Xi

Y'

(Yi-Y')

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

40,390 40,912 42,040 43,017 44,007 44,928 46,062 46,342 48,461 49,376 445,535

0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10

0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65

0.00 28,358.04 46,185.66 59,634.22 70,826.53 80,500.17 89,632.51 96,365.48 106,479.70 113,692.44 691,674.76

38,706 41,390 42,959 44,073 44,937 45,643 46,239 46,756 47,212 47,620 445,535

1684 -478 -919 -1056 -930 -715 -177 -414 1249 1756 0.00

(Yi-Y')2 Yrata-rata 2834407 228171 845055 1114956 864390 510526 31415 171526 1559733 3083647 11243828

44553.5

38706.43 3871.1003 45156.48+ (963.11 x ln Xi)

Tabel 4.3 Proyeksi Penduduk dengan Metoda Eksponensial NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a =

Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

10.579

40,390 40,912 42,040 43,017 44,007 44,928 46,062 46,342 48,461 49,376 445,535

Xi2

ln Yi

Xi ln Yi

Y'

1 4 9 16 25 36 49 64 81 100 385

10.61 10.62 10.65 10.67 10.69 10.71 10.74 10.74 10.79 10.81 107.02

10.61 21.24 31.94 42.68 53.46 64.28 75.16 85.95 97.10 108.07 590.48

40,186 41,098 42,032 42,987 43,963 44,962 45,984 47,028 48,096 49,189 445,526

(Yi -Y' ) (Yi -Y' )2 Yi rata-rata 204 -186 8 30 44 -34 78 -686 365 187 9

41793 34764 63 906 1899 1165 6159 470758 132902 34956 725363

44553.5

b = Y' =

0.022 10.720.e^0.005.X

Tabel 4.4 Proyeksi Penduduk dengan Metoda Geometri NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a= b = Y' =

Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

40,390 40,912 42,040 43,017 44,007 44,928 46,062 46,342 48,461 49,376 445,535

ln Xi

ln Xi2

ln Yi

ln Xi ln Yi

Y'

0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10

0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65

10.61 10.62 10.65 10.67 10.69 10.71 10.74 10.74 10.79 10.81 107.02

0.00 7.36 11.70 14.79 17.21 19.19 20.89 22.34 23.70 24.88 162.08

38,954 41,390 42,886 43,979 44,847 45,568 46,187 46,731 47,215 47,652 445,410

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1436 -478 -846 -962 -840 -640 -125 -389 1246 1724 125

2,063,459 228,731 715,243 926,256 705,490 410,153 15,749 150,971 1,552,881 2,971,039 9,739,973

10.570 0.088 EXP(10.718+ (0.021 x ln X))

Tabel 4.5 Proyeksi Jumlah Penduduk Tahun 2013- 2027 No

(Yi - Y' ) (Yi - Y')2

Proyeksi Penduduk Tahun Penduduk AritmatikaLogaritmaEksponensialGeometrik 2005 40,390 40,390 40,390 40,390 40,390 2006 40,912 40,912 40,912 40,912 40,912 2007 42,040 42,040 42,040 42,040 42,040 2008 43,017 43,017 43,017 43,017 43,017 2009 44,007 44,007 44,007 44,007 44,007 2010 44,928 44,928 44,928 44,928 44,928 2011 46,062 46,062 46,062 46,062 46,062 2012 46,342 46,342 46,342 46,342 46,342 2013 48,461 48,461 48,461 48,461 48,461 2014 49,376 49,376 49,376 49,376 49,376 2015 50,063 47,989 50,306 48,052 2016 51,065 48,326 51,449 48,419 2017 52,066 48,636 52,618 48,759 2018 53,068 48,922 53,813 49,077 2019 54,070 49,190 55,036 49,374 2020 55,072 49,439 56,286 49,654 2021 56,073 49,674 57,565 49,918 2022 57,075 49,895 58,872 50,168 2023 58,077 50,105 60,210 50,406 2024 59,078 50,303 61,577 50,633 2025 60,080 50,492 62,976 50,850 2026 61,082 50,672 64,407 51,057 2027 62,084 50,844 65,870 51,256 2028 63,085 51,009 67,366 51,448 2029 64,087 51,167 68,897 51,632 2030 65,089 51,319 70,462 51,810 2031 66,090 51,465 72,063 51,981 2032 67,092 51,606 73,700 52,147

Tabel 4.7 Hasil Proyeksi Penduduk No

Tahun

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032

29 30 31 32

2033 2034 2035 2036

68,094 69,096 70,097 71,099

51,742 51,873 52,000 52,123

75,374 77,086 78,837 80,628

52,307 52,463 52,613 52,760

29 30 31

2033 2034 2035

Tabel 4.9 Rekapitulasi Peningkatan Jumlah P No. Tahapan Proyek Jumlah Penduduk Persen Pelayanan Jumlah yang terlayani 1 2010 49376 0.55 27157 2 2020 61577 0.7 43104 3 2030 77086 0.8 61669

Tabel 4.8 Standar Pemakaian Air Kota 1001 Malam Standar Kebutuhan No

Jenis Fasilitas

Air Keterang Tahap I Tahap II Kapasitas an

Rumah Tangga 1

2

3

Sambunga n rumah

130

130

L/jiwa/hari

4

- Hidran umum Sekolah

30

30

L/jiwa/hari

5 6

- TK

20*

20*

L/jiwa/hari

- SD

40

40

L/jiwa/hari

8

- SMP

50

50

L/jiwa/hari

9

- SMU

80

80

L/jiwa/hari

10

PT/Akade mi

80

80

L/jiwa/hari

11

Peribadata n

10

10

L/jiwa/hari

12

*data asumsi

7

13

- Rumah Sakit

500

500

L/tt/hari

14

Puskesma s

350

350

15

- Klinik

350

350

- Apotek

350

350

L/tt/hari L/tt/hari L/h/unit

Industri* Industri Besar 5

1 2 3

Kesehatan

4

No

16 17 *data DPU tahun 2010

18 19

5

Karyawan Pria

60

60

L/o/h

20

Karyawan wanita

100

100

L/o/h

21

Industri Kecil

22

Karyawan Pria

60

60

L/o/h

23

Karyawan wanita

100

100

L/o/h

24

- Pasar - Toko

5 3

5 3

L/m /h L/o/h

- Restoran Perkantor an

15

15

L/o/h

Besar

100

100

L/jiwa/hari

Menengah

100

100

L/jiwa/hari

Kecil Lain-lain - Hotel

100

100

L/jiwa/hari

300

300

L/tt/h

- Bioskop

10

10

L/td/h

-Stadion Olahraga*

30

30

L/o/h

- Terminal bus

3

3

L/o/h

Perdagang an 6

7

8

25 2

*data asumsi

Data standarpemakaian air

Tabel 4.11 Rekapitulasi Kebutuhan Air Domestik Kota 1001 Malam Tahun Tahun Awal (2010) Jenis Sambungan SR HU Sambungan (%) 0.82 0.18 Jumlah Penduduk Yang Terlayani (Jiwa) 27157 Jumlah Pengguna 22178 4979 Standar(Jiwa) Kebutuhan Air (L/o/h) 130 30 Kebutuhan Air (L/det) 33.37 1.73 Total 35.10

Tahap I (2020) SR HU 0.82 0.18 43104 35202 7902 130 30 52.97 2.74 55.71

Tabel 4.10 Jenis Pemukiman Penduduk Kota No.

Jenis Rumah

1

Permanen

2010 65

Persen Jenis 2020 55

2030 65

Tahap II (2030) SR HU 0.85 5.01 61669 52418 308961 130 30 78.87 107.28 186.15

276.96

2 3

Semi Perm Non perma

25 10

40 5

30 5

Tabel 4.12 Rekapitulasi Penambahan Fasilitas Perkot Jumlah No.

1

Jenis Kapasitas Fasilitas Sekolah a. TK b. SD c. SMP d. SMU e. PT/A kade mi

Data Awal (2009)

*Tahap I *Tahap II (2019) (2029) SOAL

100 jiwa/unit 600 jiwa/unit 800 jiwa/unit 800 jiwa/unit 1500 jiwa/unit

23

30

35

30

35

40

24

25

30

12

25

30

9

15

18

18

X=

25

Y=

19

Z=

7

4

Peribadata n - Mesjid 2

Mushalla

400 jiwa/unit 100 jiwa/unit

41

45

50

37

40

44

36

32 - Gereja

400 jiwa/unit

10

14

16

- Rumah 300 tt/unit Sakit 40 tt/unit Puskesma s

10

13

16

17

27

31

- Klinik - Apotik Industri - Industri Besar - Industri Kecil

15 tt/unit 5 tt/unit

13 14

23 25

30 29

2 Ha/Unit

9

15

23

200 m2/Unit

17 23

30

- Pasar

700 m2/unit

8

16

20

- Toko

50 m /unit

255

5

Kesehatan

3

4

5

12 8 9

4 12

Perdagang an

5

2

3 305

330 250

5 50 m2/unit Restauran

31

45

54 26

Perkantor an

6

- Kantor besar

1000 m2/unit

13

- Kantor Menengah

600 m2/unit

19

20

25 8

30

37 14

- Kantor kecil

300 m2/unit

25

35

43

50 tt/Unit

11

20

26

500 td/Unit 4 Ha

7

10

12

2

6

9

6

10

20

Lain-Lain - Hotel - Bioskop 7

- Stadion Olahraga - Terminal 200 unit bus bus/Hari

6 2 1

2 1

Tabel 4.13 Rekapitulasi Kebutuhan Air Untuk Sarana Pendidikan No. 1 2 3 4 5

Standar Kapasitas Kebutuh (jiwa/unit an Air Tahap II ) (L/o/h) 20 35 100 40 40 600

Jumlah (unit)

Sarana Pendidik an TK SD

Tahun Awal 23 30

SMP/MT SN SMU

24 12

PT/Akade mi

9

Tahap I 30 35 25 25 15

30

800

30 18

800 1500

Kebutuhan Air (L/det) Tahun Tahap I Awal 0.53 0.69 8.33 9.72

50 80

11.11 8.89

11.57 18.52

80

12.50 41.37

20.83 61.34

Kebutuhan Total

Tabel 4.14 Rekapitulasi Kebutuhan Air Untuk Sarana Peribadatan No. 1 2 3

Sarana Peribadat an Mesjid Mushalla Gereja

Standar Kapasitas Kebutuh (jiwa/unit an Air Tahap II ) (L/o/h) 50 400 10 44 100 10

Jumlah (unit) Tahun Awal 41 37 10

Tahap I 45 40

14 16 Kebutuhan Total

400

10

Kebutuhan Air (L/det) Tahun Tahap I Awal 1.90 2.08 0.43 0.46 0.46 2.79

0.65 3.19

Tabel 4.15 Rekapitulasi Kebutuhan Air untuk Sarana Kesehatan No.

Sarana Kesehata n

Standar Kapasitas Kebutuh an Air Tahap II (tt/unit) (L/tt/h)

Jumlah (unit) Tahun Awal

Tahap I

Kebutuhan Air (L/det) Tahun Tahap I Awal

1

Rumah sakit

2 3 4

Puskesma s Klinik Apotek

13

16

300

27

31

40

10 17 13 14

23 30 25 29 Kebutuhan Total

15 5

500

17.36

22.57

350 350 350

2.75 0.79 0.28 21.19

4.38 1.40 0.51 28.85

Tabel 4.16 Rekapitulasi Kebutuhan Air untuk Sarana P Kriteria 2010 2020 Jumlah (unit) 2030 Kapasitas (m2/unit) P 2010 W Jumlah P 2020 Karyawa W n P 2030 W P Standar Kebutuhan Air (l/jiwa/hr) W P 2010 W Kebutuh P 2020 an Air W (l/dtk) P 2030 W

Industri Besar 9 15 23 20000 720 1080 1200 1800 1840 2760 60 100 0.50 1.25 0.83 2.08 1.28 3.19

Industri Kecil 17 23 30 200 27 41 37 55 48 72 60 100 0.02 0.05 0.03 0.06 0.03 0.08

Kebutuh an Total 1.82 3.01 4.59 9.41

Tabel 4.17 Rekapitulasi Kebutuhan Air untuk Sarana Perdagangan No. 1 2 3

Sarana Perdagan gan Pasar Toko Restoran

Standar Kapasitas Kebutuh Tahun Tahap I Tahap II (m2/unit) an Air Awal (L/m2/h) 5 8 16 20 700 3 255 305 330 50 15 35 45 54 50 Kebutuhan Total Jumlah (unit)

Kebutuhan Air (L/det) Tahun Tahap I Awal 0.32 0.65 0.44 0.53 0.30 0.39 1.07 1.57

Tabel 4.18 Rekapitulasi Kebutuhan Air untuk Sarana Perkantoran

1

Sarana Perkanto ran Besar

2 3

Menengah Kecil

No.

Standar Kapasitas Kebutuh Tahun Tahap I Tahap II (m2/unit) an Air Awal (L/o/h) 100 13 20 25 1000 19 30 37 600 100 100 25 35 43 300 Kebutuhan Total Jumlah (unit)

Kebutuhan Air (L/det) Tahun Tahap I Awal 1.50 2.31 1.32 0.87 3.69

2.08 1.22 5.61

Tabel 4.19 Rekapitulasi Kebutuhan Air untuk Sarana Lain-lain No.

Sarana fasilitas

Jumlah (unit)

Standar Kebutuh Kapasitas an Air (L/o/h)

Kebutuhan Air (L/det)

No. 1 2

Sarana fasilitas

3

Hotel Bioskop Stadion Olahraga

4

Terminal Bus

Standar Kebutuh Kapasitas an Air Tahap II (L/o/h) 300 26 50 10 12 500 9 40000 30

Jumlah (unit) Tahun Awal 11 7 2

Tahap I 20 10 6

1.

6 10 Kebutuhan Total

2.

3

4 5

Tahun Desain Paramete r 2010 2020 Kebutuhan Domestik Jumlah pen 49376 61577 % Pelayana 0.55 0.7 Tahun Desain Parameter 2010 2020 Sambungan 33.37 52.97 Hidran Umu 1.73 2.74 TOTAL 35.10 55.71 Kebutuhan Non Domestik (l/det) Pendidika n 41.37 61.34 Peribadata 2.79 3.19 n Kesehatan Industri Perdagang an Perkantor an Sarana lainnya TOTAL

3

2030 77086 0.8 2030 78.87 107.28 186.15

73.03 3.56

21.19 1.82

28.85 3.01

35.21 4.59

1.07

1.57

1.85

3.69

5.61

6.96

2.73 74.65

5.30 108.87

7.15 132.36

109.75

164.58

318.51

Kebocora n (20%) 21.95 Kebutuhan 131.70

32.92 197.50

63.70 382.21

Kebutuh an Total (l/det)

Tabel 4.21 Rekapitulasi Qmd dan Qp Tahap I II

TahunQ rata-rata (l/dt) Q md (l/dt) Q p (l/dt) 2020 2030

Tahun Awal 1.91 0.41

Tahap I 3.47 0.58

0.28

0.83

0.14 2.73

0.42 5.30

200 2

Tabel 4.20 Rekapitulasi Kebutuhan Air Kot No.

Kebutuhan Air (L/det)

197.50 382.21

237.00 458.65

296.25 573.31

711.41

tmatika (Yi-Yrata)2

S

R

Tahun Aritmatika Jumlah Penduduk

17,334,732

2005

40046

40390

13,260,522

2006

41047

40912

6,317,682

2007

42049

42040

2,360,832

2008

43051

43017

2009

44053

44007

2010 2011 2012 2013 2014

45054 46056 47058 48060 49061

44928

298,662

321.25

0.99

140,250 2,275,572 3,198,732 15,268,556 23,256,506 83,712,049

JumlahPenduduk

Proyeksi Penduduk Kota D

120000 115000 110000 105000

46062 46342 48461 49376

100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

a Logaritma ### ### 6,317,682 2,360,832 298,662 140,250 2,275,572 3,198,732 ### ### ###

S

1117.73

R

0.93

x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Logaritmatik Jumlah Penduduk 38706 41390 42959 44073 44937 45643 46239 46756 47212 47620

40390 40912 42040 43017 44007 44928 46062 46342 48461 49376

Proyeksi Penduduk Kota JumlahPendudukk

(Yi-Yrata) (Yi-Yrata)2 -4163.5 -3641.5 -2513.5 -1536.5 -546.5 374.5 1508.5 1788.5 3907.5 4822.5

125000

0 -1749.57 -3033.666 -2952.864 -1415.594 1202.2955 5712.0353 7733.6119 18864.612 25568.404 49929.265

125000 120000 115000 110000 105000 100000 95000

90000 2004200620082010201220142016 Tahun

oda Eksponensial -4163.50 -3641.50 -2513.50 -1536.50 -546.50 374.50 1508.50 1788.50 3907.50 4822.50

### ### ### ### ### ### ### ### ### ### ###

S

283.89

R

1.00

x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Proyeksi Penduduk Kota

Eksponensial Jumlah Penduduk 40186 41098 42032 42987 43963 44962 45984 47028 48096 49189

40390 40912 42040 43017 44007 44928 46062 46342 48461 49376

Jum lahPenduduk

(Yi -Yrata) (Yi -Yrata)2

125000 120000 115000 110000 105000 100000 95000

90000 2004 2006 2008 2010 2012 2014 20 Tahun

100000 95000

90000 2004 2006 2008 2010 2012 2014 20 Tahun

x

Yrata-rata Yi-Yrata (Yi-Yrata)2

44553.5

-4163.50 -3642 -2514 -1537 -547 375 1509 1789 3908 4823 0

### ### 6,317,682 2,360,832 298,662 140,250 2,275,572 3,198,732 ### ### ###

S

R

1040.21

0.94

Geometri Jumlah Penduduk

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

38954 41390 42886 43979 44847 45568 46187 46731 47215 47652

40390 40912 42040 43017 44007 44928 46062 46342 48461 49376

Proyeksi Pend JumlahPenduduk

etoda Geometri

125000 120000 115000 110000 105000 100000 95000

90000 200420062008201 Tahu

Hasil Proyeksi Penduduk dengan Metode Terpilih 180000

40390 40912 42040 43017 44007 44928 46062 46342 48461 49376

40390 40912 42040 43017 44007 44928 46062 46342 48461 49376 50306 51449 52618 53813 55036 56286 57565 58872 60210 61577 62976 64407 65870 67366 68897 70462 72063 73700

Jumlah Penduduk

Penduduk Eksponensial

170000

160000

150000

140000

130000

120000

110000

100000 2000 2005 2010 2015 2020 2025 2030 2035 2040 Tahun

REKAPITULASI PROYEKSI PENDUDUK TAHU 190000

REKAPITULASI PROYEKSI PENDUDUK TAHU 75374 77086 78837

Penduduk

190000

170000

f(x) = 2718.719893212x - 5354363.87055883 R² = 0.9935089654

150000

Penduduk

Tahun 2003 2004 2005

Penduduk

130000

Linear (Penduduk)

43,423 43,523 43,623

110000

43,823 90000

2006 2007 2008 2009 2010 2011 2012

43,923 44,123

Tahun

44,723 44,923 45,123 45,323 45,520

2013 2014 2015 2016

45,756 45,992 46,230 46,469

2017 2018

46,722

2019

46,959 47,196

2020 2021

47,433

3549

2022 2023 2024 2025 2026 2027

47,670 47,913 48,153 48,392 48,632 48,872

5 1 2

1

butuhan Air (L/det) Tahap II 0.81 11.11 13.89 22.22 25.00 73.03

175.74

butuhan Air (L/det) Tahap II 2.31 0.51 0.74 3.56

butuhan Air (L/det) Tahap II

9.55

27.78 5.02 1.82 0.59 35.21

85.25

butuhan Air (L/det) Tahap II 0.81 0.57 0.47 1.85

4.49

butuhan Air (L/det) Tahap II 2.89 2.57 1.49 6.96

butuhan Air (L/det)

16.26

butuhan Air (L/det) Tahap II 4.51 0.69 1.25 0.69 7.15

15.19

Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Aritmatika 125000 120000 115000 110000 105000

Column Q Column R

100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

Proyeksi Penduduk KotaDream Island Tahap II dengan Metode Logaritma 125000 120000 115000 110000 105000

Column Q Column R

100000 95000 90000 2004200620082010201220142016 Tahun

Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Eksponensial 125000 120000 115000 110000 105000 100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

Column Q Column R

5 5 9 9 9 9 9 9 13 13

0 0 0 0 0 0 0 0

0 0 0 0

100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun

JumlahPenduduk

Proyeksi Penduduk Kota Drea Island Tahap II dengan Metode Geometri

125000 120000 115000 110000 Column R

105000 100000 95000 90000 2004200620082010201220142016 Tahun

0 2035 2040

OYEKSI PENDUDUK TAHUN 2005-2035

Column S

OYEKSI PENDUDUK TAHUN 2005-2035

212x - 5354363.87055883

Penduduk Linear (Penduduk)

Tabel 4.6 Perbandingan Metode Proyeksi Penduduk Metode Aritmatik

S 321.25

R 0.99

Logaritma 1117.73

0.93

Eksponensial 283.89

1.00

0 0 0 0 0 0 0 0 0

Geometri

1040.21

0

0

0.94

0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0

0 0

0 0 0 0

0

0 0

0 0

0

Hasil Proyeksi Penduduk Per Kecamatan Kota Bukittinggi 2015-2034 No

Tahun

Jumlah Penduduk perkecamatan GP

ABTB

MAKS

Total penduduk (orang)

Rekapitulasi Total Sampah per Kecamatan No

Tahun

1

2015

44945

27235

50306

122485

1

2015

2

2016

45745

27758

51449

124952

2

2016

3

2017

46560

28291

52618

127469

3

2017

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

47389 48233 49092 49966 50856 51762 52683 53622 54577 55549 56538 57545 58570 59613 60674 61755 62855 63974

28834 29388 29953 30528 31115 31713 32322 32943 33576 34221 34878 35548 36231 36927 37637 38360 39097 39848

53813 55036 56286 57565 58872 60210 61577 62976 64407 65870 67366 68897 70462 72063 73700 75374 77086 78837

130037 132657 135331 138059 140843 143684 146583 149541 152559 155639 158783 161990 165263 168602 172011 175488 179037 182659

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Total Timbulan Tingakat pelayanan (%)/Zona Timbulan terlayani Tahun Timbulan Zona I Zona II Zona III Zona I Zona II Zona III Zona I (m3) Eksisti 471.006 172.83 104.73 193.45 83.3 60 33.6 143.97 2016 480.490 175.91 106.74 197.84 86.6 63 37.36 152.34 2017 490.168 179.04 108.79 202.34 89.9 66 40.52 160.96 2018 500.043 182.23 110.88 206.93 93.2 69 43.68 169.84 2019 510.119 185.47 113.01 211.63 96.5 72 46.84 178.98 2020 520.401 188.78 115.18 216.44 100 75 50 188.40 2021 530.893 192.14 117.39 221.36 100 78 54 191.76 2022 541.598 195.56 119.65 226.39 100 81 58 195.17 2023 552.523 199.04 121.95 231.53 100 84 62 198.65 2024 563.670 202.59 124.29 236.79 100 87 66 202.18 2025 575.045 206.20 126.68 242.17 100 90 70 205.78 2026 586.652 209.87 129.11 247.67 100 91 72 209.45 2027 598.496 213.61 131.59 253.30 100 92 74 213.18 2028 610.582 217.41 134.12 259.05 100 93 76 216.98 2029 622.916 221.28 136.70 264.94 100 94 78 220.84 2030 635.501 225.22 139.32 270.95 100 95 80 224.77 2031 648.344 229.23 142.00 277.11 100 96 82 228.78 2032 661.449 233.32 144.73 283.40 100 97 84 232.85 2033 674.823 237.47 147.51 289.84 100 98 86 237.00 2034 688.470 241.70 150.34 296.43 100 99 88 241.22 2035 702.397 246.01 153.23 303.16 100 100 90 245.51 0.00 3.19 463.43 0.688346

ulasi Total Sampah per Kecamatan Kota Bukittinggi 2015-2034 hari biasa Timbulan (m3) GP

ABTB

Total Sampah (m3)

MAKS

Rekapitulasi Total Sampah per Kecamatan Kota Bukitt No

Tahun

Timbulan (m3) GP

172.83

104.73

193.45

471.01

1

2015

181.50

175.91

106.74

197.84

480.49

2

2016

184.73

179.04

108.79

202.34

490.17

3

2017

188.02

182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01

110.88 113.01 115.18 117.39 119.65 121.95 124.29 126.68 129.11 131.59 134.12 136.70 139.32 142.00 144.73 147.51 150.34 153.23

206.93 211.63 216.44 221.36 226.39 231.53 236.79 242.17 247.67 253.30 259.05 264.94 270.95 277.11 283.40 289.84 296.43 303.16

500.04 510.12 520.40 530.89 541.60 552.52 563.67 575.04 586.65 598.50 610.58 622.92 635.50 648.34 661.45 674.82 688.47 702.40

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

191.37 194.78 198.25 201.78 205.37 209.03 212.75 216.54 220.40 224.32 228.32 232.38 236.52 240.73 245.02 249.39 253.83 258.35

Timbulan terlayani Zona II Zona III Zona I 62.84 65.00 67.25 73.91 71.80 81.99 76.51 90.39 81.37 99.13 86.39 108.22 91.57 119.53 96.92 131.30 102.44 143.55 108.13 156.28 114.01 169.52 117.49 178.32 121.07 187.44 124.73 196.88 128.50 206.65 132.36 216.76 136.32 227.23 140.39 238.06 144.56 249.26 148.84 260.86 153.23 272.84

Kenaikan tingkat pelayanan/tahun tingkat pelayanan/kota Zona II Zona III Zona I Zona II Zona III 30.57 13.34 13.80 0 0 0 31.70 14.00 15.38 1.1 0.7 1.6 32.84 14.65 16.73 1.1 0.7 1.3 33.96 15.30 18.08 1.1 0.7 1.3 35.09 15.95 19.43 1.1 0.7 1.4 36.20 16.60 20.80 1.1 0.6 1.4 36.12 17.25 22.52 0 0.6 1.7 36.04 17.89 24.24 0 0.6 1.7 35.95 18.54 25.98 0 0.6 1.7 35.87 19.18 27.73 0 0.6 1.7 35.79 19.83 29.48 0 0.6 1.8 35.70 20.03 30.40 0 0.2 0.9 35.62 20.23 31.32 0 0.2 0.9 35.54 20.43 32.24 0 0.2 0.9 35.45 20.63 33.17 0 0.2 0.9 35.37 20.83 34.11 0 0.2 0.9 35.29 21.03 35.05 0 0.2 0.9 35.20 21.22 35.99 0 0.2 0.9 35.12 21.42 36.94 0 0.2 0.9 35.04 21.62 37.89 0 0.2 1.0 34.95 21.82 38.84 0 0.2 1.0

mpah per Kecamatan Kota Bukittinggi 2015-2034 hari lebaran

38292 38464 38827 39135 39439 41643

Timbulan (m3) ABTB

MAKS

Total Sampah (m3)

109.98

203.15

494.63

112.09

207.77

504.59

114.25

212.49

514.76

116.44 118.68 120.96 123.28 125.65 128.07 130.53 133.03 135.59 138.19 140.85 143.56 146.31 149.12 151.99 154.91 157.88 160.92

217.31 222.25 227.30 232.46 237.74 243.15 248.67 254.32 260.10 266.00 272.05 278.23 284.55 291.01 297.62 304.38 311.30 318.37

525.13 42254 535.71 42627 546.51 43457 557.53 44277 568.77 580.24 591.95 603.89 616.08 628.52 641.21 287.9 654.16 463.43 tngkat 667.38 62.12373 pelayanan 680.87 Kota 694.63 708.68 175.53 723.01 0.378763 737.63

Beban tingkat pelayanan Kota 0 3.4 3.1 3.1 3.1 3.1 2.3 2.3 2.3 2.3 2.3 1.0 1.0 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1

0.03 0.024 271.80 293.50 314.75 336.73 359.48 383.01 402.86 423.39 444.63 466.60 489.31 505.26 521.68 538.59 555.99 573.89 592.33 611.30 630.82 650.91 671.59

57.7 61.1 64.2 67.3 70.5 73.6 75.9 78.2 80.5 82.8 85.1 86.1 87.2 88.2 89.3 90.3 91.4 92.4 93.5 94.5 95.6

62.3 65.5 68.6 71.8 74.9 77.3 79.6 81.9 84.3 86.6 87.6 88.6 89.6 90.6 91.6 92.6 93.6 94.6 95.6 96.6

3.4

22593 22852 23411 23893 24359 24665

40390 40912 42040 43017 44007 44928

25253 25446 26342 26838

46062 46342 48461 49376

349.42 0.3 0.35 0.57 4.75 3.17 17.59 13.07 74.21 463.43 114.01 0.3262836 3092 3092 0.0249515

101275 102228 104278 106045 107805 111236 113569 114415 118260 120491 368.7025

368.7 1.055177 0.3 0.57 4.753 3.17 13.74 39.143 16.61 77.15 116.29 77.15 484.993 116.293 116.293

92.76 74.208

2.9 3.06

0.3 0.57 4.753 3.17 13.74 16.61 61.36

100.503 372.85 473.353

5 5 9 9 9 9 9 9 13 13

0 0 0 33.183 0.027 0.0513 0.42777 0.4121 1.7862 0

0 0 0 0

0 33.183 0.027 0.0513 0.42777 0.4121 1.7862

0.35 0.4 0.81 0.9 0.99 1.08 1.17 1.26 1.95 2.08

0.105

0 0

0.245 0.28 0.567 0.63 0.693 0.756 0.819 0.882 1.365 1.456 0 0 0 0

0.73 -1.08

0.574 -0.819

-0.105

0.351 0.378 0.585 0.624

0

tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

timbulan hari biasa (m3/h)

timbulan jumlah penduduk timbulan (l/h) per orang Domestik 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90

44945 45745 46560 47389 48233 49092 49966 50856 51762 52683 53622 54577 55549 56538 57545 58570 59613 60674 61755 62855 63974

130339.15 132660.38 135022.95 137427.59 139875.05 142366.11 144901.52 147482.09 150108.62 152781.93 155502.84 158272.21 161090.90 163959.79 166879.77 169851.75 172876.67 175955.45 179089.06 182278.48 185524.70

Non Domestik 130.34 132.66 135.02 137.43 139.88 142.37 144.90 147.48 150.11 152.78 155.50 158.27 161.09 163.96 166.88 169.85 172.88 175.96 179.09 182.28 185.52

tahun

26.1 129.61 103.51 3.9659004

42.49 43.25 44.02 44.80 45.60 46.41 47.24 48.08 48.94 49.81 50.69 51.60 52.52 53.45 54.40 55.37 56.36 57.36 58.38 59.42 60.48

timbulan per orang

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22

2030 2031 2032 2033 2034 2035

1. Kel. Kayu Kubu

Kelurahan

% Pesebaran

Tahun

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

2. Kel. Pakan Kurai

0.22 0.22 0.22 0.22 0.22 0.22

3. Kel. Benteng Pasar Atas

8.30 11.95 12.64 13.36 14.10 14.86 15.64 15.92 16.20 16.49 16.78 17.08 17.38 17.69 18.01 18.33 18.66 18.99 19.33 19.67 20.02 20.38 6449.60

14.66 21.11 22.33 23.60 24.90 26.24 27.62 28.11 28.61 29.12 29.64 30.17 30.71 31.25 31.81 32.38 32.95 33.54 34.14 34.74 35.36 35.99 2102.57

2.93 4.22 4.46 4.72 4.98 5.24 5.52 5.62 5.72 5.82 5.92 6.03 6.14 6.25 6.36 6.47 6.59 6.70 6.82 6.94 7.07 7.19 8552.17

4450.59848091

12906.7355946459

4207.5958038546

biasa (m3/h)

timbulan ZONA I

Timbulan hari lebaran Total 172.83 175.91 179.04 182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01

Domestik 138.16 140.62 143.12 145.67 148.27 150.91 153.60 156.33 159.12 161.95 164.83 167.77 170.76 173.80 176.89 180.04 183.25 186.51 189.83 193.22 196.66

Non domestik 43.34 44.11 44.90 45.70 46.51 47.34 48.18 49.04 49.91 50.80 51.71 52.63 53.57 54.52 55.49 56.48 57.48 58.51 59.55 60.61 61.69

Total

Tahun 181.50 184.73 188.02 191.37 194.78 198.25 201.78 205.37 209.03 212.75 216.54 220.40 224.32 228.32 232.38 236.52 240.73 245.02 249.39 253.83 258.35

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

timbulan hari biasa (m3/h) jumlah penduduk 44945 45745 46560 47389 48233 49092 49966 50856 51762 52683 53622 54577 55549 56538 57545

timbulan (l/h)

9887.80 10063.89 10243.12 10425.54 10611.21 10800.19 10992.53 11188.30 11387.55 11590.35 11796.77 12006.86 12220.69 12438.33 12659.84

Domestik 9.89 10.06 10.24 10.43 10.61 10.80 10.99 11.19 11.39 11.59 11.80 12.01 12.22 12.44 12.66

Non Domestik 33.62 34.22 34.83 35.45 36.08 36.72 37.37 38.04 38.72 39.41 40.11 40.82 41.55 42.29 43.04

(m3/hari ) 172.83 175.91 179.04 182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01 16.7

Timbulan hari lebaran Total 43.51 44.28 45.07 45.87 46.69 47.52 48.37 49.23 50.11 51.00 51.91 52.83 53.77 54.73 55.70

Domestik

Non domestik

10.48 10.67 10.86 11.05 11.25 11.45 11.65 11.86 12.07 12.29 12.50 12.73 12.95 13.18 13.42

34.29 34.90 35.52 36.16 36.80 37.46 38.12 38.80 39.49 40.20 40.91 41.64 42.38 43.14 43.90

Total 44.77 45.57 46.38 47.21 48.05 48.90 49.77 50.66 51.56 52.48 53.42 54.37 55.34 56.32 57.32

58570 59613 60674 61755 62855 63974 4. Kel. Bukit Cangang Kayu Ramang 5.54 7.98 8.44 8.92 9.41 9.92 10.44 10.62 10.81 11.00 11.20 11.40 11.60 11.81 12.02 12.23 12.45 12.67 12.90 13.13 13.36 13.60

17114.3313985

12885.31 13114.78 13348.34 13586.07 13828.02 14074.29

12.89 13.11 13.35 13.59 13.83 14.07

5. Kel. Aur Tajungkan g Tengah Sawah

6. Kel. Tarok Dipo

17.21 24.78 26.22 27.70 29.23 30.80 32.42 33.00 33.59 34.19 34.80 35.42 36.05 36.69 37.34 38.01 38.68 39.37 40.07 40.79 41.51 42.25

40.15 57.59 60.93 64.38 67.93 71.59 75.36 76.70 78.07 79.46 80.87 82.31 83.78 85.27 86.79 88.34 89.91 91.51 93.14 94.80 96.49 98.21

43.81 44.59 45.38 46.19 47.02 47.85

56.70 57.71 58.73 59.78 60.84 61.93

7. Kel. Bukit Apit Puhun

11.22 16.15 17.09 18.06 19.06 20.08 21.14 21.51 21.90 22.29 22.69 23.09 23.50 23.92 24.34 24.78 25.22 25.67 26.13 26.59 27.06 27.55

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

13.66 13.90 14.15 Ti 14.40 m 14.66 bu la 14.92

44.69 45.48 46.29 47.12 47.96 48.81

58.34 59.38 60.44 61.52 62.61 63.73

Smpah nyang ditampung dengan menggunakan k de ng an pe w mknn ad dan sisa ah mkn daun an 0.00 0.00 K 7.40 0.22 11.95 o m 7.83 0.24 12.64 un 8.28 0.25 13.36 al 8.73 0.26 14.10 9.20 0.28 14.86 9.69 0.29 15.64 9.86 0.30 15.92 23.61 0.71 38.10 24.03 0.73 38.78 24.45 0.74 39.47 24.89 0.75 40.17 25.33 0.76 40.88 25.78 0.78 41.61 26.24 0.79 42.35 30.72 0.93 49.58 31.27 0.94 50.46 31.82 0.96 51.36 32.39 0.98 52.27 32.97 0.99 53.21 33.55 1.01 54.15 34.15 1.03 55.12

Sampah Basah Sampah Kering tingkat mknn besi dan pelayana Timbula dan sisa kertas metal n n (ton/h) mkn daun krtn kain kaca plastik lainnya lain-lain 83.3 143.97 89.20 2.69 19.72 0.63 0.85 23.31 0.09 7.49 87 152.34 94.39 2.85 20.87 0.67 0.90 24.66 0.09 7.92 90 160.96 99.73 3.01 22.05 0.71 0.95 26.06 0.10 8.37 93 169.84 105.23 3.18 23.27 0.75 1.00 27.50 0.10 8.83 97 178.98 110.90 3.35 24.52 0.79 1.06 28.98 0.11 9.31 100 188.40 116.73 3.52 25.81 0.83 1.11 30.50 0.11 9.80 100 191.76 118.81 3.59 26.27 0.84 1.13 31.05 0.12 9.97 100 195.17 120.93 3.65 26.74 0.86 1.15 31.60 0.12 10.15 100 198.65 123.08 3.71 27.21 0.87 1.17 32.16 0.12 10.33 100 202.18 125.27 3.78 27.70 0.89 1.19 32.73 0.12 10.51 100 205.78 127.50 3.85 28.19 0.91 1.21 33.32 0.12 10.70 100 209.45 129.77 3.92 28.69 0.92 1.24 33.91 0.13 10.89 100 213.18 132.09 3.99 29.21 0.94 1.26 34.51 0.13 11.09 100 216.98 134.44 4.06 29.73 0.95 1.28 35.13 0.13 11.28 100 220.84 136.83 4.13 30.26 0.97 1.30 35.75 0.13 11.48 100 224.77 139.27 4.20 30.79 0.99 1.33 36.39 0.13 11.69 100 228.78 141.75 4.28 31.34 1.01 1.35 37.04 0.14 11.90 100 232.85 144.27 4.35 31.90 1.02 1.37 37.70 0.14 12.11 100 237.00 146.84 4.43 32.47 1.04 1.40 38.37 0.14 12.32 100 241.22 149.46 4.51 33.05 1.06 1.42 39.05 0.14 12.54 100 245.51 152.12 4.59 33.64 1.08 1.45 39.75 0.15 12.77 3.34 0.0 0.0 ZONA I

komposisi sampah

timbulan Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

tingkat mknn (m3/hari pelayana Timbula dan sisa kertas ) n n (m3/h) mkn daun krtn kain 43.51 83.5 36.33 22.51 0.68 4.98 0.16 44.28 87 38.44 23.81 0.72 5.27 0.17 45.07 90 40.61 25.16 0.76 5.56 0.18 45.87 93 42.84 26.55 0.80 5.87 0.19 46.69 97 45.15 27.97 0.84 6.19 0.20 47.52 100 47.52 29.44 0.89 6.51 0.21 48.37 100 48.37 29.97 0.90 6.63 0.21 49.23 100 49.23 30.50 0.92 6.74 0.22 50.11 100 50.11 31.05 0.94 6.86 0.22 51.00 100 51.00 31.60 0.95 6.99 0.22 51.91 100 51.91 32.16 0.97 7.11 0.23 52.83 100 52.83 32.73 0.99 7.24 0.23 53.77 100 53.77 33.32 1.01 7.37 0.24 54.73 100 54.73 33.91 1.02 7.50 0.24 55.70 100 55.70 34.51 1.04 7.63 0.25

2030 2031 2032 2033 2034 2035

ung dengan menggunakan kontainer

56.70 57.71 58.73 59.78 60.84 61.93

100 100 100 100 100 100

56.70 57.71 58.73 59.78 60.84 61.93

35.13 35.75 36.39 37.04 37.70 38.37

1.06 1.08 1.10 1.12 1.14 1.16

7.77 7.91 8.05 8.19 8.34 8.48

0.25 0.25 0.26 0.26 0.27 0.27

bentor dan besam

besi dan kertas metal Sampah Sampah krtn kain kaca plastik lainnya lain-lain Basah Kering basah kering 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.64 0.05 0.07 1.93 0.01 0.62 7.63 4.32 4.32 1 1.73 0.06 0.07 2.05 0.01 0.66 8.07 4.57 4.57 1 1.83 0.06 0.08 2.16 0.01 0.69 8.53 4.83 3.38 1 1.93 0.06 0.08 2.28 0.01 0.73 9.00 5.10 3.06 1 2.04 0.07 0.09 2.41 0.01 0.77 9.48 5.37 2.69 1 2.14 0.07 0.09 2.53 0.01 0.81 9.98 5.66 2.27 1 2.18 0.07 0.09 2.58 0.01 0.83 10.16 5.76 2.31 1 5.22 0.17 0.22 6.17 0.02 1.98 24.32 13.78 9.68 2 5.31 0.17 0.23 6.28 0.02 2.02 24.75 14.03 9.26 2 5.41 0.17 0.23 6.39 0.02 2.05 25.19 14.28 8.21 2 5.50 0.18 0.24 6.50 0.02 2.09 25.64 14.53 7.74 2 5.60 0.18 0.24 6.62 0.02 2.13 26.10 14.79 7.88 2 5.70 0.18 0.25 6.74 0.02 2.16 26.56 15.06 6.74 2 5.80 0.19 0.25 6.86 0.03 2.20 27.03 15.32 6.21 2 6.79 0.22 0.29 8.03 0.03 2.58 31.65 17.94 8.00 2 6.91 0.22 0.30 8.17 0.03 2.62 32.21 18.26 7.47 2 7.04 0.23 0.30 8.32 0.03 2.67 32.78 18.58 6.91 2 7.16 0.23 0.31 8.46 0.03 2.72 33.37 18.91 6.34 2 7.29 0.23 0.31 8.61 0.03 2.77 33.96 19.25 5.74 2 7.42 0.24 0.32 8.77 0.03 2.82 34.57 19.59 5.12 2 7.55 0.24 0.33 8.92 0.03 2.87 35.18 19.94 5.21 2

Total Volume (m3/h) Sampah Sampah Basah Kering Tahun 91.89 97.24 102.74 108.41 114.24 120.26 122.40 124.58 126.80 129.05 131.35 133.69 136.07 138.50 140.96 143.47 146.03 148.63 151.28 153.97 156.71

52.09 55.12 58.23 61.45 64.76 68.16 69.38 70.61 71.87 73.15 74.45 75.78 77.13 78.50 79.90 81.32 82.77 84.25 85.75 87.27 88.83

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

S. Jalan 0.99 1.05 1.11 1.17 1.23 1.30 1.32 1.35 1.37 1.40 1.42 1.45 1.47 1.50 1.52 1.55 1.58 1.61 1.64 1.66 1.69

1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Pengom target 3r posan 0 0.00 0 0.00 3 3.08 4 4.34 5 5.71 6 7.22 6 7.34 7 8.72 8 10.14 10 12.91 11 14.45 11 14.71 13 17.69 14 19.39 15 21.14 16 22.96 17 24.82 18 26.75 19 28.74 20 30.79 20 31.34

Total sampah yang di Daur Ulang olah 0.00 0.00 0.00 0.00 1.75 4.83 2.46 6.79 3.24 8.95 4.09 11.31 4.16 11.51 4.94 13.66 5.75 15.89 7.32 20.22 8.19 22.64 8.34 23.04 10.03 27.72 10.99 30.38 11.98 33.13 13.01 35.97 14.07 38.90 15.16 41.92 16.29 45.03 17.45 48.25 17.77 49.11 6.83 7.74

kaca 0.21 0.23 0.24 0.25 0.27 0.28 0.29 0.29 0.30 0.30 0.31 0.31 0.32 0.32 0.33

plastik 5.88 6.22 6.57 6.94 7.31 7.69 7.83 7.97 8.11 8.26 8.40 8.55 8.71 8.86 9.02

besi dan metal Sampah Sampah lainnya lain-lain Basah Kering 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

1.89 2.00 2.11 2.23 2.35 2.47 2.52 2.56 2.61 2.65 2.70 2.75 2.80 2.85 2.90

23.19 24.53 25.92 27.35 28.82 30.33 30.87 31.42 31.98 32.55 33.13 33.72 34.32 34.93 35.56

13.14 13.91 14.69 15.50 16.33 17.19 17.50 17.81 18.13 18.45 18.78 19.11 19.45 19.80 20.15

target 3r 0 2 2 5 5 5 8 8 10 10 10 15 15 15 15

16.72 18.73

Total sampah yang di olah 0.00 0.00 4.83 6.79 8.95 11.30 11.51 13.66 15.89 20.22 22.64 23.04 27.71 30.38 33.13 35.96 38.89 41.91 45.03 48.24 49.10 11.53 12.92 13.14

Pengompos Daur an Ulang 0.00 0.00 0.49 0.28 0.52 0.29 1.37 0.78 1.44 0.82 1.52 0.86 2.47 1.40 2.51 1.42 3.20 1.81 3.26 1.85 3.31 1.88 5.06 2.87 5.15 2.92 5.24 2.97 5.33 3.02

0.33 0.34 0.35 0.35 0.36 0.37

9.18 9.34 9.51 9.68 9.85 10.03

0.03 0.03 0.04 0.04 0.04 0.04

2.95 3.00 3.05 3.11 3.16 3.22

2 2 2 2 2 2 2 3 3 3 3 3 2 2 2 2 2 1 1 1 1

1 1 1 1 1 1 2

2 2 2 2 2 3 3

Total truck 7.63 8.07 5.15 4.24 3.22 2.07 2.11 14.75 13.63 11.04 9.79 9.97 7.16 5.77 8.46 7.04 5.56 4.03 2.44 0.80 0.81

15 5.43 3.08 36.19 20.51 20 7.37 4.18 36.83 20.88 20 7.50 4.25 37.49 21.25 20 7.63 4.33 38.16 21.63 20 7.77 4.40 38.84 22.01 20 7.91 4.48 39.53 22.41 Sampah yang diangkut dengan becak motor volume sampah yang diangkut dengan mknn dan kertas becak sisa mkn daun krtn motor 25.42 0.77 5.62 41.03 26.90 0.81 5.95 5 2 43.42 28.42 0.86 6.28 5 2 45.87 29.99 0.91 6.63 5 2 48.40 31.61 0.95 6.99 6 3 51.01 33.27 1.00 7.36 6 3 53.69 33.86 1.02 7.49 6 3 54.65 34.46 1.04 7.62 7 3 55.62 35.08 1.06 7.76 5 3 56.61 35.70 1.08 7.89 6 3 57.62 36.34 1.10 8.03 6 3 58.65 36.99 1.12 8.18 6 3 59.69 37.64 1.14 8.32 6 3 60.76 38.31 1.16 8.47 6 3 61.84 39.00 1.18 8.62 6 3 62.94 39.69 1.20 8.78 7 4 64.06 40.40 1.22 8.93 7 4 65.20 41.12 1.24 9.09 7 4 66.36 41.85 1.26 9.25 7 4 67.54 42.60 1.29 9.42 8 4 68.75 43.35 1.31 9.59 8 4 69.97 5298.92 159.93 1171.65 8 4 8552.17 0.00

Sampah yang di olah kompos 0.00 0.00 3.38 4.76 6.26 7.91 8.05 9.56 11.12 14.15 15.85 16.13 19.40 21.26 23.19 25.17 27.22 29.34 31.52 33.77 34.37 8.07 9.05 9.20

Total sampah yang di olah 0.00 0.77 0.81 2.14 2.26 2.38 3.87 3.94 5.01 5.10 5.19 7.93 8.07 8.21 8.36

daur ulang 0.00 0.00 1.45 2.04 2.68 3.39 3.45 4.10 4.77 6.07 6.79 6.91 8.31 9.11 9.94 10.79 11.67 12.57 13.51 14.47 14.73

SB

SK 0.00

0.00

0.00 2.13 3.00 3.95 4.99 5.07 6.02 7.01 8.92 9.98 10.16 12.22 13.40 14.61 15.86 17.15 18.48 19.86 21.28 21.65

0.00 1.01 1.42 1.87 2.36 2.41 2.86 3.32 4.23 4.73 4.82 5.80 6.35 6.93 7.52 8.13 8.77 9.42 10.09 10.27

3.46 3.88 3.94

bebab tingkat tingkat timbulan pelayana pelayana m3/h n n 39.26 42.59 44.86 47.20 49.61 50.49 51.39 52.31 53.58 54.53 55.50 56.49 57.50 58.52

368.06 392.2456 405.9437 419.6418 433.3399 433.3399 433.3399 433.3399 436.0787 436.0787 436.0787 436.0787 436.0787 436.0787

306.86 24.1856 13.69811 13.69811 13.69811 0 0 0 2.738711 0 0 0 0 0

Residu sampah 0.00 0.00 1.69 2.38 3.13 3.95 4.03 4.78 5.56 7.07 7.92 8.06 9.70 10.63 11.59 12.58 13.61 14.66 15.75 16.88 17.18

Jumlah Kontaine Tahun r

Sampah Volumeyang angsung ke TPA

sampah Kontainer Kontainer yang 6 m3 8 m3 masuk 2015 ke143.97 13 0 TPA

1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

152.34 156.13 163.04 170.03 177.10 180.25 181.51 182.75 181.97 183.15 186.41 185.47 186.60 187.71 188.81 189.88 190.94 191.97 192.97 196.41

18 18 18 18 15 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0

78.00

97

6 7 7 7 10 15 18 18 23 23 23 23 23 23 24 24 24 24 24 25

8.51 11.54 11.75 11.96 12.17 12.39

kain 0.18 0.19 0.20 0.21 0.22 0.24 0.24 0.24 0.25 0.25 0.26 0.26 0.27 0.27 0.28 0.28 0.29 0.29 0.30 0.30 0.31 37.63

59.56 57.71 58.73 59.78 60.84 61.93

kaca

436.0787 0 415.0943 -20.9843 415.0943 0 415.0943 0 415.0943 0 415.0943 0

plastik 0.24 6.64 0.26 7.03 0.27 7.43 0.29 7.84 0.30 8.26 0.32 8.69 0.32 8.85 0.33 9.01 0.33 9.17 0.34 9.33 0.35 9.50 0.35 9.66 0.36 9.84 0.36 10.01 0.37 10.19 0.38 10.37 0.38 10.56 0.39 10.74 0.40 10.94 0.41 11.13 0.41 11.33 50.46 1384.60

besi dan metal Sampah Sampah lainnya lain-lain Basah Kering 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 5.13

2.13 2.26 2.39 2.52 2.65 2.79 2.84 2.89 2.94 3.00 3.05 3.10 3.16 3.22 3.27 3.33 3.39 3.45 3.51 3.57 3.64 444.71

26.19 27.71 29.28 30.90 32.56 34.27 34.88 35.50 36.14 36.78 37.44 38.10 38.78 39.47 40.17 40.89 41.62 42.36 43.11 43.88 44.66 5458.85

14.84 15.71 16.60 17.51 18.46 19.43 19.77 20.12 20.48 20.85 21.22 21.60 21.98 22.37 22.77 23.18 23.59 24.01 24.44 24.87 25.32 3094.17

Pengadaa pengadaa n6m n 8 m truck 6 m3 truck 8m3 ritasi 0 16 5 6 16 0 1 16 0 0 16 0 10 3 8 0 1 3 9 0 1 3 9 0 1 3 9 0 2 3 9 0 8 0 12 0 2 0 12 0 2 0 12 0 5 0 12 0 1 0 12 0 2 0 12 0 3 0 12 0 3 0 12 0 6 0 12 0 2 0 12 0 2 0 12 0 5 0 13

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

pengadaan pengadaan 8 m 0 0 0 0 0 0 0 0 3 8 0 1 0 1 0 1 0 1 0 1 0 1 0 1 7 5 0 1 0 1 0 1 0 1 0 1 0 1 0 1 7 6

timbulan hari biasa (m3/h) tahun

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

jumlah timbulan pendudu per orang k

2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90

27235 27758 28291 28834 29388 29953 30528 31115 31713 32322 32943 33576 34221 34878 35548 36231 36927 37637 38360 39097 39848

timbulan (l/h)

78980.08 80497.39 82043.86 83620.04 85226.49 86863.81 88532.59 90233.42 91966.93 93733.74 95534.50 97369.85 99240.46 101147.01 103090.18 105070.69 107089.24 109146.57 111243.43 113380.57 115558.77

Non Domesti Domesti k k 78.98 80.50 82.04 83.62 85.23 86.86 88.53 90.23 91.97 93.73 95.53 97.37 99.24 101.15 103.09 105.07 107.09 109.15 111.24 113.38 115.56

25.75 26.24 26.75 27.26 27.78 28.32 28.86 29.42 29.98 30.56 31.14 31.74 32.35 32.97 33.61 34.25 34.91 35.58 36.27 36.96 37.67

Total

104.73 106.74 108.79 110.88 113.01 115.18 117.39 119.65 121.95 124.29 126.68 129.11 131.59 134.12 136.70 139.32 142.00 144.73 147.51 150.34 153.23

timbulan hari biasa (m3/h) tahun

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

jumlah timbulan pendudu per orang k 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22

27235 27758 28291 28834 29388 29953 30528 31115 31713 32322 32943

timbulan (l/h) 5991.59 6106.70 6224.02 6343.59 6465.46 6589.67 6716.27 6845.29 6976.80 7110.84 7247.44

Non Domesti Domesti k k 5.99 6.11 6.22 6.34 6.47 6.59 6.72 6.85 6.98 7.11 7.25

20.37 20.76 21.16 21.57 21.98 22.40 22.84 23.27 23.72 24.18 24.64

Total 26.36 26.87 27.39 27.91 28.45 28.99 29.55 30.12 30.70 31.29 31.89

Timbulan hari lebaran

Domestik

Non domestik

83.72 85.33 86.97 88.64 90.34 92.08 93.84 95.65 97.48 99.36 101.27 103.21 105.19 107.22 109.28 111.37 113.51 115.70 117.92 120.18 122.49

26.26 26.77 27.28 27.81 28.34 28.88 29.44 30.00 30.58 31.17 31.77 32.38 33.00 33.63 34.28 34.94 35.61 36.29 36.99 37.70 38.43

Total

109.98 112.09 114.25 116.44 118.68 120.96 123.28 125.65 128.07 130.53 133.03 135.59 138.19 140.85 143.56 146.31 149.12 151.99 154.91 157.88 160.92

Timbulan hari lebaran Domestik

Non domestik

6.35 6.47 6.60 6.72 6.85 6.99 7.12 7.26 7.40 7.54 7.68

20.78 21.18 21.58 22.00 22.42 22.85 23.29 23.74 24.20 24.66 25.13

Total 27.13 27.65 28.18 28.72 29.28 29.84 30.41 31.00 31.59 32.20 32.82

2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22

Kelurahan

% Pesebaran 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Tahun 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

33576 34221 34878 35548 36231 36927 37637 38360 39097 39848

el ak an g Ba lo k

11.15 11.68 11.90 12.13 12.36 12.60 12.84 13.09 13.34 13.60 13.86 14.12 14.40 14.67 14.95 15.24 15.53 15.83 16.14 16.45 16.76 17.09

7386.68 7528.59 7673.22 7820.63 7970.88 8124.01 8280.08 8439.16 8601.28 8766.53

Birug o

23.16 24.25 24.72 25.20 25.68 26.17 26.68 27.19 27.71 28.24 28.79 29.34 29.90 30.48 31.06 31.66 32.27 32.89 33.52 34.16 34.82 35.49

7.39 7.53 7.67 7.82 7.97 8.12 8.28 8.44 8.60 8.77

25.11 25.60 26.09 26.59 27.10 27.62 28.15 28.69 29.24 29.81

32.50 33.13 33.76 34.41 35.07 35.75 36.43 37.13 37.85 38.57

7.83 7.98 8.13 8.29 8.45 8.61 8.78 8.95 9.12 9.29

25.62 26.11 26.61 27.12 27.64 28.17 28.72 29.27 29.83 30.40

33.45 34.09 34.74 35.41 36.09 36.79 37.49 38.21 38.95 39.69

A ur K un in g

sa pir an

ku bu ta nj un g

pa ka n la bu ah

la da ng ca kl ah

Pa rit an ta ng

25.94 27.17 27.69 28.22 28.76 29.31 29.88 30.45 31.04 31.63 32.24 32.86 33.49 34.14 34.79 35.46 36.14 36.83 37.54 38.26 39.00 39.75

12.25 12.83 13.08 13.33 13.58 13.84 14.11 14.38 14.66 14.94 15.23 15.52 15.82 16.12 16.43 16.75 17.07 17.40 17.73 18.07 18.42 18.77

5.08 5.32 5.42 5.53 5.63 5.74 5.85 5.96 6.08 6.19 6.31 6.44 6.56 6.68 6.81 6.94 7.08 7.21 7.35 7.49 7.64 7.78

10.75 11.26 11.47 11.69 11.92 12.15 12.38 12.62 12.86 13.11 13.36 13.62 13.88 14.15 14.42 14.69 14.98 15.27 15.56 15.86 16.16 16.47

6.78 7.10 7.24 7.38 7.52 7.66 7.81 7.96 8.11 8.27 8.43 8.59 8.75 8.92 9.09 9.27 9.45 9.63 9.81 10.00 10.19 10.39

4.89 5.12 5.22 5.32 5.42 5.53 5.63 5.74 5.85 5.96 6.08 6.19 6.31 6.43 6.56 6.68 6.81 6.94 7.08 7.21 7.35 7.49

zona B

mknn dan sisa kertas timbulan tingkat p Timbulan mkn daun krtn kain kaca 104.73 60 62.84 38.93 1.18 8.61 0.28 0.37 106.74 63.00 67.25 41.67 1.26 9.21 0.30 0.40 108.79 66.00 71.80 44.49 1.34 9.84 0.32 0.42 110.88 69.00 76.51 47.40 1.43 10.48 0.34 0.45 113.01 72.00 81.37 50.42 1.52 11.15 0.36 0.48 115.18 75.00 86.39 53.52 1.62 11.83 0.38 0.51 117.39 78.0 91.57 56.74 1.71 12.54 0.40 0.54 119.65 81.0 96.92 60.05 1.81 13.28 0.43 0.57 121.95 84.0 102.44 63.47 1.92 14.03 0.45 0.60 124.29 87.0 108.13 67.00 2.02 14.81 0.48 0.64 126.68 90.0 114.01 70.64 2.13 15.62 0.50 0.67 129.11 91.0 117.49 72.80 2.20 16.10 0.52 0.69 131.59 92.0 121.07 75.01 2.26 16.59 0.53 0.71 134.12 93.0 124.73 77.28 2.33 17.09 0.55 0.74 136.70 94.0 128.50 79.62 2.40 17.60 0.57 0.76 139.32 95.0 132.36 82.01 2.48 18.13 0.58 0.78 142.00 96.0 136.32 84.46 2.55 18.68 0.60 0.80 144.73 97.0 140.39 86.98 2.63 19.23 0.62 0.83 147.51 98.0 144.56 89.57 2.70 19.80 0.64 0.85 150.34 99.0 148.84 92.22 2.78 20.39 0.65 0.88 153.23 100.0 153.23 94.94 2.87 20.99 0.67 0.90 interval tgkt pelayanan per tahun 15 3.00 3 1.00 zona B

timbulan tingkat p 26.36 60 26.87 63.00 27.39 66.00 27.91 69.00 28.45 72.00 28.99 75.00 29.55 78.0 30.12 81.0 30.70 84.0 31.29 87.0 31.89 90.0

mknn dan sisa kertas Timbulan mkn daun krtn kain kaca 15.82 9.80 0.30 2.17 0.07 0.09 16.93 10.49 0.32 2.32 0.07 0.10 18.07 11.20 0.34 2.48 0.08 0.11 19.26 11.93 0.36 2.64 0.08 0.11 20.48 12.69 0.38 2.81 0.09 0.12 21.75 13.47 0.41 2.98 0.10 0.13 23.05 14.28 0.43 3.16 0.10 0.14 24.40 15.12 0.46 3.34 0.11 0.14 25.79 15.98 0.48 3.53 0.11 0.15 27.22 16.87 0.51 3.73 0.12 0.16 28.70 17.78 0.54 3.93 0.13 0.17

32.50 33.13 33.76 34.41 35.07 35.75 36.43 37.13 37.85 38.57

91.0 92.0 93.0 94.0 95.0 96.0 97.0 98.0 99.0 100.0

29.58 30.48 31.40 32.35 33.32 34.32 35.34 36.39 37.47 38.57

18.33 18.88 19.45 20.04 20.64 21.26 21.90 22.55 23.21 23.90

0.55 0.57 0.59 0.60 0.62 0.64 0.66 0.68 0.70 0.72

4.05 4.18 4.30 4.43 4.56 4.70 4.84 4.99 5.13 5.28

0.13 0.13 0.14 0.14 0.15 0.15 0.16 0.16 0.16 0.17

0.17 0.18 0.19 0.19 0.20 0.20 0.21 0.21 0.22 0.23

3 1.00 m bu la n un tu k w ad besi dan ah mknn kertas metal ko dan sisa m mkn daun krtn kain kaca plastik lainnya lain-lain un 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.83 0.51 3.72 0.12 0.16 4.40 27.17 0.02 1.41 17.16 0.52 3.79 0.12 0.16 4.48 27.69 0.02 1.44 17.49 0.53 3.87 0.12 0.17 4.57 28.22 0.02 1.47 17.82 0.54 3.94 0.13 0.17 4.66 28.76 0.02 1.50 18.16 0.55 4.02 0.13 0.17 4.75 29.31 0.02 1.52 18.51 0.56 4.09 0.13 0.18 4.84 29.88 0.02 1.55 18.87 0.57 4.17 0.13 0.18 4.93 30.45 0.02 1.58 19.23 0.58 4.25 0.14 0.18 5.02 31.04 0.02 1.61 19.60 0.59 4.33 0.14 0.19 5.12 31.63 0.02 1.64 19.98 0.60 4.42 0.14 0.19 5.22 32.24 0.02 1.68 20.36 0.61 4.50 0.14 0.19 5.32 32.86 0.02 1.71 20.75 0.63 4.59 0.15 0.20 5.42 33.49 0.02 1.74 21.15 0.64 4.68 0.15 0.20 5.53 34.14 0.02 1.78 21.56 0.65 4.77 0.15 0.21 5.63 34.79 0.02 1.81 21.97 0.66 4.86 0.16 0.21 5.74 35.46 0.02 1.84 22.39 0.68 4.95 0.16 0.21 5.85 36.14 0.02 1.88 22.82 0.69 5.05 0.16 0.22 5.96 36.83 0.02 1.92 23.26 0.70 5.14 0.17 0.22 6.08 37.54 0.02 1.95 23.71 0.72 5.24 0.17 0.23 6.19 38.26 0.02 1.99 24.16 0.73 5.34 0.17 0.23 6.31 39.00 0.02 2.03 24.63 0.74 5.45 0.17 0.23 6.44 39.75 0.02 2.07

40 63.83 0.626665

plastik 10.17 10.89 11.62 12.39 13.17 13.99 14.82 15.69 16.58 17.51 18.46 19.02 19.60 20.19 20.80 21.43 22.07 22.73 23.40 24.10 24.81

besi dan metal lainnya 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.07 0.07 0.07 0.07 0.08 0.08 0.08 0.08 0.09 0.09 0.09

Sampah Sampah lain-lain Basah Kering S. Jalan 3.27 3.50 3.73 3.98 4.23 4.49 4.76 5.04 5.33 5.62 5.93 6.11 6.30 6.49 6.68 6.88 7.09 7.30 7.52 7.74 7.97

40.11 42.92 45.83 48.83 51.94 55.14 58.45 61.86 65.39 69.02 72.77 75.00 77.28 79.62 82.02 84.48 87.01 89.61 92.27 95.00 97.81

22.73 24.33 25.98 27.68 29.44 31.25 33.13 35.06 37.06 39.12 41.25 42.51 43.80 45.13 46.49 47.89 49.32 50.79 52.30 53.85 55.44

0.43 0.46 0.50 0.53 0.56 0.60 0.63 0.67 0.71 0.75 0.79 0.81 0.84 0.86 0.89 0.91 0.94 0.97 1.00 1.03 1.06

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Pengom Daur target 3r posan Ulang 0 0.00 0.00 5 2.15 1.22 6 2.75 1.56 6 2.93 1.66 6 3.12 1.77 6 3.31 1.88 6 3.51 1.99 7 4.33 2.45 8 5.23 2.96 9 6.21 3.52 10 7.28 4.12 10 7.50 4.25 12 9.27 5.26 13 10.35 5.87 13 10.66 6.04 14 11.83 6.70 15 13.05 7.40 16 14.34 8.13 17 15.69 8.89 18 17.10 9.69 20 19.56 11.09

2.72

plastik 2.56 2.74 2.93 3.12 3.32 3.52 3.73 3.95 4.17 4.41 4.65

besi dan metal lainnya 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02

Sampah Sampah lain-lain Basah Kering 0.82 0.88 0.94 1.00 1.07 1.13 1.20 1.27 1.34 1.42 1.49

10.10 10.80 11.54 12.29 13.07 13.88 14.71 15.57 16.46 17.37 18.32

5.72 6.12 6.54 6.97 7.41 7.87 8.34 8.83 9.33 9.85 10.38

Pengom Daur target 3r posan Ulang 2 0.20 0.11 3 0.32 0.18 5 0.58 0.33 8 0.98 0.56 10 1.31 0.74 10 1.39 0.79 12 1.77 1.00 12 1.87 1.06 12 1.98 1.12 15 2.61 1.48 15 2.75 1.56

4.79 4.93 5.08 5.24 5.39 5.56 5.72 5.89 6.07 6.24

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.54 1.58 1.63 1.68 1.73 1.78 1.84 1.89 1.95 2.01

18.88 19.45 20.04 20.65 21.27 21.90 22.56 23.23 23.92 24.62

17 17 17 18 18 18 20 20 20 20

10.70 11.03 11.36 11.70 12.05 12.42 12.79 13.17 13.56 13.96

3.21 3.31 3.41 3.72 3.83 3.94 4.51 4.65 4.78 4.92

1.82 1.87 1.93 2.11 2.17 2.23 2.56 2.63 2.71 2.79

gerobak s Sampah Di olah

Sampah Sampah Basah Kering 17.34 17.67 18.01 18.36 18.71 19.07 19.44 19.81 20.19 20.58 20.97 21.38 21.79 22.21 22.63 23.07 23.51 23.96 24.42 24.89 25.37

0.00 9.83 10.02 10.21 10.41 10.61 10.81 11.02 11.23 11.44 11.66 11.89 12.12 12.35 12.59 12.83 13.08 13.33 13.58 13.84 14.11 14.38

SB

sb

SK 9.83 9.01 8.92 9.03 9.14 9.25 9.37 9.19 8.99 8.75 8.47 8.59 7.99 7.72 7.82 7.52 7.19 6.84 6.47 6.07 5.19

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

sk 10 10 10 10 10 10 10

sb 9 9 9 9 9 9 9

sk 2 2 2 2 2 2 3 7 7 7 7 8 8 8 8 8 12 12 12 12 12

1 1 1 1 1 1 1 4 4 4 4 5 5 5 5 5 7 7 7 7 7

4

1

4 2

1

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037

Total sampah yang di olah 0.00 3.36 4.31 4.59 4.88 5.18 5.49 6.78 8.20 9.73 11.40 11.75 14.53 16.22 16.71 18.53 20.45 22.46 24.58 26.79 30.65

Total sampah yang di olah 0.32 0.51 0.90 1.54 2.05 2.17 2.77 2.93 3.09 4.08 4.31

Total sampah yang di olah 0.00 3.36 4.31 4.59 4.88 5.18 5.49 6.78 8.19 9.73 11.40 11.75 14.53 16.22 16.70 18.53 20.45 22.46 24.57 26.79 30.65

70 0.00 2.35 3.02 3.21 3.42 3.63 3.85 4.75 5.74 6.81 7.98 8.22 10.17 11.35 11.69 12.97 14.31 15.72 17.20 18.75 21.45

30 0.00 1.01 1.29 1.38 1.46 1.55 1.65 2.04 2.46 2.92 3.42 3.52 4.36 4.86 5.01 5.56 6.13 6.74 7.37 8.04 9.19

6.26 10.71 10.20 12.12

6.60 10.10 5.73 9.45

2.32 4.84 3.58 4.69

Tahun 1.48 1.90 2.02 2.15 2.29 2.42 2.99 3.61 4.29 5.03 5.18 6.41 7.15 7.37 8.17 9.02 9.91 10.84 11.81 13.51

0.70 0.90 0.96 1.02 1.08 1.15 1.42 1.71 2.04 2.38 2.46 3.04 3.39 3.49 3.88 4.28 4.70 5.14 5.60 6.41

1.18 1.51 1.61 1.71 1.81 1.92 2.37 2.87 3.40 3.99 4.11 5.08 5.67 5.84 6.48 7.15 7.86 8.60 9.37 10.72

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2

2.52

0.84

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Volume sampah yang masuk ke TPA 62.84 63.88 67.49 71.92 76.49 81.20 86.07 90.13 94.24 98.40 102.61 105.74 106.54 108.52 111.79 113.83 115.87 117.92 119.98 122.05 122.58

5.03 5.18 5.34 5.82 6.00 6.18 7.07 7.28 7.49 7.72

volume sampah yang diangkut mknn dengan dan sisa becak mkn daun motor 28.47 45.94 29.01 46.83 29.57 47.73 30.14 48.64 30.72 49.58 31.31 50.53 31.91 51.50 32.52 52.49 33.15 53.50 33.78 54.53 34.43 55.57 35.10 56.64 35.77 57.73 36.46 58.84 37.16 59.97 37.87 61.12 38.60 62.30 39.34 63.49 40.10 64.71 40.87 65.96 41.65 67.22 0.00 0.00

0.86 0.88 0.89 0.91 0.93 0.94 0.96 0.98 1.00 1.02 1.04 1.06 1.08 1.10 1.12 1.14 1.16 1.19 1.21 1.23 1.26 0.00

kertas krtn kain kaca plastik 6.29 0.20 0.27 7.44 6.42 0.21 0.28 7.58 6.54 0.21 0.28 7.73 6.66 0.21 0.29 7.88 6.79 0.22 0.29 8.03 6.92 0.22 0.30 8.18 7.06 0.23 0.30 8.34 7.19 0.23 0.31 8.50 7.33 0.24 0.32 8.66 7.47 0.24 0.32 8.83 7.61 0.24 0.33 9.00 7.76 0.25 0.33 9.17 7.91 0.25 0.34 9.35 8.06 0.26 0.35 9.53 8.22 0.26 0.35 9.71 8.37 0.27 0.36 9.90 8.53 0.27 0.37 10.09 8.70 0.28 0.37 10.28 8.87 0.28 0.38 10.48 9.04 0.29 0.39 10.68 9.21 0.30 0.40 10.88 0.00 0.00 0.00 0.00

besi dan metal Sampah lainnya lain-lain Basah 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.00

2.39 2.43 2.48 2.53 2.58 2.63 2.68 2.73 2.78 2.84 2.89 2.95 3.00 3.06 3.12 3.18 3.24 3.30 3.37 3.43 3.50 0.00

29.33 29.89 30.46 31.05 31.65 32.25 32.87 33.50 34.15 34.80 35.47 36.15 36.85 37.56 38.28 39.01 39.76 40.53 41.31 42.10 42.91 0.00

Kotainer 8 m3 pengadaan truck 8 m3 ritasi 0 0 0 8 9 5 8 0 5 9 0 5 10 0 5 10 1 6 11 0 6 11 1 7 12 0 7 12 9 7 13 1 7 13 1 8 13 0 8 14 1 8 14 1 8 14 1 8 14 0 8 15 9 8 15 1 8 15 1 8 15 0 8

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

pengadaan truck 0 5 0 0 0 1 0 1 0 5 0 1 0 1 0 1 0 5 0 1 0

Sampah Kering 16.62 16.94 17.27 17.60 17.94 18.28 18.63 18.99 19.36 19.73 20.11 20.49 20.89 21.29 21.70 22.11 22.54 22.97 23.41 23.86 24.32 0.00

tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

timbulan jumlah per pendudu orang k 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90

50306 51449 52618 53813 55036 56286 57565 58872 60210 61577 62976 64407 65870 67366 68897 70462 72063 73700 75374 77086 78837

timbulan hari biasa (m3/h) timbulan Non Domesti (l/h) Domesti k k

Total

145888.70 149202.82 152592.21 156058.61 159603.75 163229.42 166937.46 170729.73 174608.15 178574.68 182631.31 186780.09 191023.12 195362.54 199800.54 204339.35 208981.27 213728.64 218583.85 223549.36 228627.67

193.45 197.84 202.34 206.93 211.63 216.44 221.36 226.39 231.53 236.79 242.17 247.67 253.30 259.05 264.94 270.95 277.11 283.40 289.84 296.43 303.16

145.89 149.20 152.59 156.06 159.60 163.23 166.94 170.73 174.61 178.57 182.63 186.78 191.02 195.36 199.80 204.34 208.98 213.73 218.58 223.55 228.63

47.56 48.64 49.75 50.88 52.03 53.21 54.42 55.66 56.92 58.22 59.54 60.89 62.27 63.69 65.13 66.61 68.13 69.68 71.26 72.88 74.53

timbulan hari biasa (ton/h) tahun

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

timbulan jumlah per pendudu orang k 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22

50306 51449 52618 53813 55036 56286 57565 58872 60210 61577 62976 64407 65870

timbulan Non Domesti (kg/h) Domesti k k 11067.42 11318.83 11575.96 11838.93 12107.87 12382.92 12664.22 12951.91 13246.14 13547.04 13854.79 14169.52 14491.41

11.07 11.32 11.58 11.84 12.11 12.38 12.66 12.95 13.25 13.55 13.85 14.17 14.49

37.63 38.48 39.36 40.25 41.17 42.10 43.06 44.04 45.04 46.06 47.11 48.18 49.27

Total 48.70 49.80 50.93 52.09 53.27 54.48 55.72 56.99 58.28 59.61 60.96 62.35 63.76

Timbulan hari lebaran Domestik

Non domestik

154.64 158.15 161.75 165.42 169.18 173.02 176.95 180.97 185.08 189.29 193.59 197.99 202.48 207.08 211.79 216.60 221.52 226.55 231.70 236.96 242.35

48.51 49.61 50.74 51.89 53.07 54.28 55.51 56.77 58.06 59.38 60.73 62.11 63.52 64.96 66.44 67.95 69.49 71.07 72.68 74.33 76.02

Total 203.15 207.77 212.49 217.31 222.25 227.30 232.46 237.74 243.15 248.67 254.32 260.10 266.00 272.05 278.23 284.55 291.01 297.62 304.38 311.30 318.37

Timbulan hari lebaran Domestik

Non domestik

11.73 12.00 12.27 12.55 12.83 13.13 13.42 13.73 14.04 14.36 14.69 15.02 15.36

38.38 39.25 40.15 41.06 41.99 42.94 43.92 44.92 45.94 46.98 48.05 49.14 50.26

Total 50.11 51.25 52.42 53.61 54.82 56.07 57.34 58.65 59.98 61.34 62.73 64.16 65.62

2028 2029 2030 2031 2032 2033 2034 2035

0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22

Kelurahan

% Pesebaran 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Tahun 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

14820.61 15157.28 15501.61 15853.75 16213.90 16582.22 16958.92 17344.17

14.82 15.16 15.50 15.85 16.21 16.58 16.96 17.34

50.39 51.53 52.71 53.90 55.13 56.38 57.66 58.97

Ca m pa go ip uh

camp ago gugu k bulek

K ub u G ul ai ba nc ah

Pu hu n te m bo k

20.11 38.90 39.79 40.69 41.61 42.56 43.53 44.52 45.53 46.56 47.62 48.70 49.81 50.94 52.10 53.28 54.49 55.73 56.99 58.29 59.61 60.97

13.76 26.62 27.22 27.84 28.47 29.12 29.78 30.46 31.15 31.86 32.58 33.32 34.08 34.85 35.65 36.46 37.28 38.13 39.00 39.88 40.79 41.71

11.30 21.86 22.36 22.86 23.38 23.91 24.46 25.01 25.58 26.16 26.76 27.37 27.99 28.62 29.27 29.94 30.62 31.31 32.02 32.75 33.50 34.26

13.43 25.98 26.57 27.17 27.79 28.42 29.07 29.73 30.40 31.09 31.80 32.52 33.26 34.02 34.79 35.58 36.39 37.22 38.06 38.93 39.81 40.71

67366 68897 70462 72063 73700 75374 77086 78837

65.21 66.69 68.21 69.76 71.34 72.96 74.62 76.31

Pu hu n pi ny u ka bu n 13.26 25.65 26.23 26.83 27.44 28.06 28.70 29.35 30.02 30.70 31.40 32.11 32.84 33.59 34.35 35.13 35.93 36.74 37.58 38.43 39.31 40.20

15.71 16.07 16.43 16.80 17.19 17.58 17.98 18.38

51.40 52.57 53.76 54.98 56.23 57.51 58.81 60.15

67.11 68.63 70.19 71.79 73.42 75.08 76.79 78.53

M an gg is ga nti ng

Pu lai an ak air

G ar eg eh

10.00 19.34 19.78 20.23 20.69 21.16 21.64 22.14 22.64 23.15 23.68 24.22 24.77 25.33 25.91 26.49 27.10 27.71 28.34 28.98 29.64 30.32

10.36 20.04 20.50 20.96 21.44 21.93 22.42 22.93 23.45 23.99 24.53 25.09 25.66 26.24 26.84 27.45 28.07 28.71 29.36 30.03 30.71 31.41

5.06 9.79 10.01 10.24 10.47 10.71 10.95 11.20 11.46 11.72 11.98 12.25 12.53 12.82 13.11 13.41 13.71 14.02 14.34 14.67 15.00 15.34

zona C Komposisi Sampah timbulan zona A tingkat mknn (m3/hari pelayana Timbula dan sisa kertas ) n n (m3/h) mkn daun krtn kain kaca 193.45 33.6 65.00 40.27 1.22 8.90 0.29 0.38 197.84 37.4 73.91 45.80 1.38 10.13 0.33 0.44 202.34 40.5 81.99 50.80 1.53 11.23 0.36 0.48 206.93 43.7 90.39 56.00 1.69 12.38 0.40 0.53 211.63 46.8 99.13 61.42 1.85 13.58 0.44 0.58 216.44 50.0 108.22 67.05 2.02 14.83 0.48 0.64 221.36 54.0 119.53 74.06 2.24 16.38 0.53 0.71 226.39 58.0 131.30 81.36 2.46 17.99 0.58 0.77 231.53 62.0 143.55 88.94 2.68 19.67 0.63 0.85 236.79 66.0 156.28 96.83 2.92 21.41 0.69 0.92 242.17 70.0 169.52 105.03 3.17 23.22 0.75 1.00 247.67 72.0 178.32 110.49 3.33 24.43 0.78 1.05 253.30 74.0 187.44 116.14 3.51 25.68 0.82 1.11 259.05 76.0 196.88 121.99 3.68 26.97 0.87 1.16 264.94 78.0 206.65 128.04 3.86 28.31 0.91 1.22 270.95 80.0 216.76 134.31 4.05 29.70 0.95 1.28 277.11 82.0 227.23 140.79 4.25 31.13 1.00 1.34 283.40 84.0 238.06 147.50 4.45 32.61 1.05 1.40 289.84 86.0 249.26 154.44 4.66 34.15 1.10 1.47 296.43 88.0 260.86 161.63 4.88 35.74 1.15 1.54 303.16 90.0 272.84 169.05 5.10 37.38 1.20 1.61 interval per tahun 16.4 3.28 3.0 2.0

zona C

Komposisi Sampah

timbulan zona A tingkat mknn (m3/hari pelayana Timbula dan sisa kertas ) n n (m3/h) mkn daun krtn kain kaca 48.70 33.7 16.41 10.17 0.31 2.25 0.07 0.10 49.80 37.4 18.61 11.53 0.35 2.55 0.08 0.11 50.93 40.5 20.64 12.79 0.39 2.83 0.09 0.12 52.09 43.7 22.75 14.10 0.43 3.12 0.10 0.13 53.27 46.8 24.95 15.46 0.47 3.42 0.11 0.15 54.48 50.0 27.24 16.88 0.51 3.73 0.12 0.16 55.72 54.0 30.09 18.64 0.56 4.12 0.13 0.18 56.99 58.0 33.05 20.48 0.62 4.53 0.15 0.20 58.28 62.0 36.14 22.39 0.68 4.95 0.16 0.21 59.61 66.0 39.34 24.38 0.74 5.39 0.17 0.23 60.96 70.0 42.67 26.44 0.80 5.85 0.19 0.25 62.35 72.0 44.89 27.81 0.84 6.15 0.20 0.26 63.76 74.0 47.18 29.24 0.88 6.46 0.21 0.28

65.21 76.0 66.69 78.0 68.21 80.0 69.76 82.0 71.34 84.0 72.96 86.0 74.62 88.0 76.31 90.0 interval per tahun 16.4 3.28 3.0 2.0 m bu al an w ad ah mknn ko dan sisa m mkn un

K ot o Se la ya n 2.72 5.26 5.38 5.50 5.63 5.76 5.89 6.02 6.16 6.30 6.44 6.59 6.74 6.89 7.05 7.21 7.37 7.54 7.71 7.88 8.06 8.25

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

20.04 20.50 20.96 21.44 21.93 22.42 22.93 23.45 23.99 24.53 25.09 25.66 26.24 26.84 27.45 28.07 56.42 57.70 59.01 60.35 61.72

12.42 12.70 12.99 13.28 13.58 13.89 14.21 14.53 14.86 15.20 15.54 15.90 16.26 16.63 17.01 17.39 34.96 35.75 36.56 37.39 38.24

49.56 52.02 54.57 57.20 59.93 62.75 65.66 68.68

30.71 32.23 33.81 35.44 37.13 38.88 40.69 42.56

kertas krtn

daun 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.52 1.06 1.08 1.10 1.13 1.15

2.75 2.81 2.87 2.94 3.00 3.07 3.14 3.21 3.29 3.36 3.44 3.52 3.60 3.68 3.76 3.85 7.73 7.91 8.08 8.27 8.46

0.93 0.97 1.02 1.07 1.12 1.17 1.23 1.28

kain

6.79 7.13 7.48 7.84 8.21 8.60 9.00 9.41

kaca 0.09 0.09 0.09 0.09 0.10 0.10 0.10 0.10 0.11 0.11 0.11 0.11 0.12 0.12 0.12 0.12 0.25 0.25 0.26 0.27 0.27

0.22 0.23 0.24 0.25 0.26 0.28 0.29 0.30

plastik 0.12 0.12 0.12 0.13 0.13 0.13 0.14 0.14 0.14 0.14 0.15 0.15 0.15 0.16 0.16 0.17 0.33 0.34 0.35 0.36 0.36

3.24 3.32 3.39 3.47 3.55 3.63 3.71 3.80 3.88 3.97 4.06 4.15 4.25 4.35 4.44 4.54 9.13 9.34 9.55 9.77 9.99

0.29 0.31 0.32 0.34 0.35 0.37 0.39 0.41

besi dan metal lainnya 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.04 0.04 0.04

isi Sampah

Potensi Pengomposan dan Daur Ulang

plastik 10.52 11.97 13.27 14.63 16.05 17.52 19.35 21.26 23.24 25.30 27.45 28.87 30.35 31.87 33.46 35.09 36.79 38.54 40.36 42.23 44.17

besi dan metal Sampah Sampah lainnya lain-lain Basah Kering S. Jalan 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.09 0.09 0.10 0.11 0.11 0.12 0.12 0.13 0.14 0.14 0.15 0.16 0.16

3.38 3.84 4.26 4.70 5.15 5.63 6.22 6.83 7.46 8.13 8.81 9.27 9.75 10.24 10.75 11.27 11.82 12.38 12.96 13.56 14.19

41.49 47.18 52.33 57.70 63.27 69.08 76.30 83.81 91.63 99.75 108.20 113.82 119.64 125.67 131.90 138.36 145.04 151.95 159.11 166.50 174.16

23.52 26.74 29.66 32.70 35.87 39.15 43.25 47.51 51.94 56.54 61.33 64.52 67.82 71.23 74.77 78.42 82.21 86.13 90.18 94.38 98.72

isi Sampah

0.45 0.51 0.57 0.62 0.68 0.75 0.82 0.91 0.99 1.08 1.17 1.23 1.29 1.36 1.43 1.50 1.57 1.64 1.72 1.80 1.88

1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2

5 5 9 9 9 9 9 9 13 13

Pengom target 3r posan 0 0.00 0 0.00 2 1.05 3 1.73 4 2.53 5 3.45 5 3.81 6 5.03 7 6.41 8 7.98 10 10.82 10 11.38 11 13.16 12 15.08 13 17.15 14 19.37 15 21.76 16 24.31 17 27.05 18 29.97 20 34.83

Potensi Pengomposan dan Daur Ulang

plastik 2.66 3.01 3.34 3.68 4.04 4.41 4.87 5.35 5.85 6.37 6.91 7.27 7.64

besi dan metal Sampah Sampah lainnya lain-lain Basah Kering 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03

0.85 0.97 1.07 1.18 1.30 1.42 1.56 1.72 1.88 2.05 2.22 2.33 2.45

10.47 11.88 13.17 14.52 15.93 17.39 19.21 21.10 23.07 25.11 27.24 28.65 30.12

5.94 6.73 7.47 8.23 9.03 9.86 10.89 11.96 13.07 14.23 15.44 16.24 17.07

Pengom Daur target 3r posan Ulang 4 0.42 0.24 5 0.59 0.34 5 0.66 0.37 8 1.16 0.66 10 1.59 0.90 10 1.74 0.99 13 2.50 1.42 15 3.16 1.79 18 4.15 2.35 18 4.52 2.56 20 5.45 3.09 20 5.73 3.25 20 6.02 3.41

Total sampah yang di olah 0.66 0.93 1.03 1.82 2.50 2.72 3.91 4.96 6.51 7.08 8.54 8.98 9.44

8.02 8.42 8.83 9.26 9.70 10.16 10.63 11.12

0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04

2.58 2.71 2.84 2.97 3.12 3.26 3.41 3.57

31.63 33.20 34.83 36.51 38.25 40.05 41.91 43.84

Sampah Sampah lain-lain Basah Kering SB 1.04 1.07 1.09 1.11 1.14 1.17 1.19 1.22 1.25 1.28 1.30 1.33 1.36 1.40 1.43 1.46 2.93 3.00 3.07 3.14 3.21

12.79 13.08 13.38 13.68 13.99 14.31 14.64 14.97 15.31 15.66 16.01 16.38 16.75 17.13 17.52 17.92 36.01 36.83 37.67 38.52 39.40

7.25 7.42 7.58 7.76 7.93 8.11 8.30 8.49 8.68 8.88 9.08 9.28 9.49 9.71 9.93 10.16 20.41 20.88 21.35 21.84 22.33

17.93 18.82 19.74 20.70 21.68 22.70 23.76 24.85

SK 7.25 7.42 7.09 6.94 6.74 6.49 6.50 6.12 5.66 5.12 3.99 3.93 3.31 2.62 1.87 1.05 10.19 9.45 8.64 7.75 5.96

sb

20 20 20 20 20 20 20 20

6.33 6.64 6.97 7.30 7.65 8.01 8.38 8.77

3.59 3.76 3.95 4.14 4.34 4.54 4.75 4.97

1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 3 5 5 5 5 5

12 12 12 12 12 12 12

8 8 8 8 8 8 8

9.91 10.40 10.91 11.44 11.99 12.55 13.13 13.74

sk

2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 2 2 2 2 2

2 2 2 2 2 2 2 5 5 5 5 5 6 6 4 4 8 8 8 9 9

31 25 13

1 1 1.5

2

5 0

1 7 1 5 1

1

31 25 19.5 75.5

59

engomposan dan Daur Ulang

Daur Ulang 0.00 0.00 0.59 0.98 1.43 1.96 2.16 2.85 3.64 4.52 6.13 6.45 7.46 8.55 9.72 10.98 12.33 13.78 15.33 16.99 19.74

Total sampah yang di olah

Total sampah yang di olah

0.00 0.00 1.64 2.71 3.97 5.41 5.98 7.88 10.05 12.50 16.95 17.83 20.62 23.63 26.87 30.35 34.09 38.09 42.38 46.96 54.57

0.00 0.00 1.64 2.71 3.97 5.41 5.98 7.88 10.05 12.50 16.95 17.83 20.62 23.63 26.86 30.35 34.08 38.09 42.37 46.95 54.57

15.75 33.95

11.86 12.51 24.22

S. S.Basah Kering 0.00 0.00 1.15 1.90 2.78 3.79 4.18 5.51 7.03 8.75 11.87 12.48 14.43 16.54 18.81 21.24 23.86 26.66 29.66 32.87 38.20 4 8.30 8.76 16.96

0.00 0.00 0.49 0.81 1.19 1.62 1.79 2.36 3.01 3.75 5.09 5.35 6.19 7.09 8.06 9.10 10.23 11.43 12.71 14.09 16.37 2 3.56 3.75 7.27

Tahun

0.72 1.20 1.75 2.39 2.64 3.47 4.43 5.51 7.48 7.86 9.09 10.42 11.85 13.38 15.03 16.80 18.69 20.71 24.06 2.52

0.34 0.57 0.83 1.13 1.25 1.65 2.10 2.62 3.55 3.73 4.31 4.94 5.62 6.35 7.13 7.97 8.86 9.82 11.41 1.39

0.57 0.95 1.39 1.89 2.09 2.76 3.52 4.37 5.93 6.24 7.21 8.27 9.40 10.62 11.92 13.33 14.82 16.43 19.09 2.09

1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

3

5 3

1

volume sampah yang diangkut mknn besi dan dengan dan sisa kertas metal becak mkn daun krtn kain kaca plastik lainnya motor 52.58 1.59 11.63 0.37 0.50 13.74 84.87 0.05 42.57 1.28 9.41 0.30 0.41 11.12 68.71 0.04 43.54 1.31 9.63 0.31 0.41 11.38 70.27 0.04 44.53 1.34 9.85 0.32 0.42 11.64 71.87 0.04 45.54 1.37 10.07 0.32 0.43 11.90 73.50 0.04 46.58 1.41 10.30 0.33 0.44 12.17 75.17 0.05 47.63 1.44 10.53 0.34 0.45 12.45 76.88 0.05 48.72 1.47 10.77 0.35 0.46 12.73 78.62 0.05 49.82 1.50 11.02 0.35 0.47 13.02 80.41 0.05 50.95 1.54 11.27 0.36 0.49 13.31 82.24 0.05 52.11 1.57 11.52 0.37 0.50 13.62 84.11 0.05 53.30 1.61 11.78 0.38 0.51 13.93 86.02 0.05 54.51 1.65 12.05 0.39 0.52 14.24 87.97 0.05 55.74 1.68 12.33 0.40 0.53 14.57 89.97 0.05 57.01 1.72 12.61 0.40 0.54 14.90 92.01 0.06 58.31 1.76 12.89 0.41 0.56 15.24 94.10 0.06 59.63 1.80 13.18 0.42 0.57 15.58 96.24 0.06 60.98 1.84 13.48 0.43 0.58 15.94 98.43 0.06 62.37 1.88 13.79 0.44 0.59 16.30 100.66 0.06 63.79 1.93 14.10 0.45 0.61 16.67 102.95 0.06 65.24 1.97 14.42 0.46 0.62 17.05 105.29 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Volume sampah Kontainer pengada yang 8 m3 an masuk ke truck TPA 65.00 73.91 80.35 87.68 95.16 102.81 113.56 123.43 133.50 143.78 152.57 160.49 166.82 173.25 179.79 186.42 193.15 199.97 206.89 213.90 218.28

0 9 10 10 12 13 14 15 17 18 19 20 21 22 23 23 24 25 26 27 28

0 10 0 1 1 1 2 1 0 12 1 2 2 1 3 2 0 13 2 3 3

ritasi 0 5 5 6 7 7 8 9 9 10 10 11 11 11 12 12 12 13 13 14 14

pengadaan truck 2 0 2 5 2 2 1 2 1 2 2 1 2 1 2 2 6 2 2 2 2 1 2 2 2 2 1 2 2 7 2 2 3 2 1

lain-lain 4.41 3.57 3.65 3.74 3.82 3.91 4.00 4.09 4.18 4.28 4.37 4.47 4.57 4.68 4.78 4.89 5.00 5.12 5.23 5.35 5.47 0.00

Sampah Sampah Basah Kering 54.17 43.86 44.85 45.87 46.92 47.98 49.07 50.19 51.33 52.49 53.68 54.90 56.15 57.43 58.73 60.07 61.43 62.83 64.25 65.71 67.21 0.00

30.70 24.86 25.42 26.00 26.59 27.20 27.81 28.45 29.09 29.75 30.43 31.12 31.83 32.55 33.29 34.05 34.82 35.61 36.42 37.25 38.09 0.00

Kec. Guguk Panjang 1. Kel. Kayu Kubu 2. Kel. Pakan Kurai 3. Kel. Benteng Pasar Atas

21,490 1,794 3,119 634

22,787 1,880 3,370 662

44,277 3,674 6,489 1,296

100.00 8.30 14.66

29.89 61.96

2.93 4. Kel. Bukit Cangang Kayu Ramang

1,135

5. Kel. Aur Tajungkang Tengah Sawah 6. Kel. Tarok Dipo 7. Kel. Bukit Apit Puhun

3,715

Kec. Mandiangin Koto Selayan 1. Kel. Campago Ipuh 2. Kel. Campago Ggk. Bulek 3. Kel. Kubu Gulai Bancah 4. Kel. Puhun Tembok 5. Kel. Puhun Pintu Kabun 6. Kel. Manggis Ganting 7. Kel. Pulai Anak Air 8. Kel. Garegeh 9. Kel. Koto Selayan Kec. Aur Birugo Tigo Baleh 1. Kel. Belakang Balok 2. Kel. Birugo 3. Aur Kuning 4. Kel. Sapiran 5. Kel. Kubu Tanjung 6. Kel. Pakan Labuah 7. Kel. Ladang Cakiah 8. Kel. Parit Antang Total

1,317

2,452 5.54

3,906

7,621

8,669 2,424 24.261

9,110 2,542 25.115

17,779 4,966 49,376

4,953 3,340

4,978 3453

9,931 6793

2579

3001

5580

17.21 40.15 11.22

20.11 13.76

3,218 3,183

3,411 3,364

6,629 6,547

2,495 2,580 1,214 699 12,657

2,444 2,533 1,285 646 14,181

4,939 5,113 2,499 1,345 26,838

1,170 2,901

1,822 3,316

3,421 1,579 669 1,379 891 647 58,408

3,540 1,709 694 1,506 928 666 62,083

2,992 6,217 6,961 3,288 1,363 2,885 1,819 1,313 120,491

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

11.30 13.43 13.26 10.00 10.36 5.06 2.72

11.15 23.16 25.94 12.25 5.08 10.75 6.78 4.89

Jumlah Kontainer (buah) Jumlah Amroll Truck Zona I Zona II Zona III Zona I Zona II Zona III 0 2 12 0 1 5 2 12 2 1 5 2 12 2 1 5 2 12 2 1 6 2 12 3 1 6 2 12 3 1 6 3 12 3 1 7 7 0 3 4 5 7 0 3 4 6 7 0 3 4 6 7 0 3 4 6 8 0 3 5 6 8 0 3 5 6 8 0 3 5

Total T 0 8 8 8 8 8 8 0 0 0 0 0 0 0

2029 2030 2031 2032 2033 2034 2035

6 7 7 7 7 8 8

8 8 12 12 12 12 12

0 0 0 0 0 0 0

3 4 4 4 4 4 4

5 5 7 7 7 7 7

0 0 0 0 0 0 0

6.29 1.87

36.18 63.83 100.01

0.83 sampah K &P dari sampah kering

84%

83

69.72

0.84 dari sampah kertas dan plastik 0.63 DARI SAMPAH BASAH

5 5 9 9 9 9 9 9 13 13

0

0

0

0

0 0

0 0

0

0

0

0

0 0

0 0

0 0

0 0

0 0 0 0

0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0

0 0

0 0 0

0 0

0 0

0

0 0 0 0

0 0

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Timbulan sampah Total (m3/h) Zona I Zona II Zona III 172.83 104.73 193.45 175.91 106.74 197.84 179.04 108.79 202.34 182.23 110.88 206.93 185.47 113.01 211.63 188.78 115.18 216.44 192.14 117.39 221.36 195.56 119.65 226.39 199.04 121.95 231.53 202.59 124.29 236.79 206.20 126.68 242.17 209.87 129.11 247.67 213.61 131.59 253.30 217.41 134.12 259.05 221.28 136.70 264.94 225.22 139.32 270.95 229.23 142.00 277.11 233.32 144.73 283.40 237.47 147.51 289.84 241.70 150.34 296.43 246.01 153.23 303.16

Target 3R (m3/h) Sampah yang langsung Timbulan Sampah Telayani (m3/h) (m3/h) Zona I Zona II Zona III Zona I Zona II Zona III Zona I 143.97 62.84 65.00 0.00 0.00 0.00 143.97 152.34 67.25 73.91 0.00 3.36 0.00 152.34 160.96 71.80 81.99 4.83 4.31 1.64 156.13 169.84 76.51 90.39 6.79 4.59 2.71 163.04 178.98 81.37 99.13 8.95 4.88 3.97 170.03 188.40 86.39 108.22 11.30 5.18 5.41 177.10 191.76 91.57 119.53 11.51 5.49 5.98 180.25 195.17 96.92 131.30 13.66 6.78 7.88 181.51 198.65 102.44 143.55 15.89 8.19 10.05 182.75 202.18 108.13 156.28 20.22 9.73 12.50 181.97 205.78 114.01 169.52 22.64 11.40 16.95 183.15 209.45 117.49 178.32 23.04 11.75 17.83 186.41 213.18 121.07 187.44 27.71 14.53 20.62 185.47 216.98 124.73 196.88 30.38 16.22 23.63 186.60 220.84 128.50 206.65 33.13 16.70 26.86 187.71 224.77 132.36 216.76 35.96 18.53 30.35 188.81 228.78 136.32 227.23 38.89 20.45 34.08 189.88 232.85 140.39 238.06 41.91 22.46 38.09 190.94 237.00 144.56 249.26 45.03 24.57 42.37 191.97 241.22 148.84 260.86 48.24 26.79 46.95 192.97 245.51 153.23 272.84 49.10 30.65 54.57 196.41

Zona I Sampah ba 91.89 97.24 102.74 108.41 114.24 120.26 122.40 124.58 126.80 129.05 131.35 133.69 136.07 138.50 140.96 143.47 146.03 148.63 151.28 153.97 156.71

Sampah yang langsung ke TPA (m3/h) Zona II Zona III 62.84 65.00 63.88 73.91 67.49 80.35 71.92 87.68 76.49 95.16 81.20 102.81 86.07 113.56 90.13 123.43 94.24 133.50 98.40 143.78 102.61 152.57 105.74 160.49 106.54 166.82 108.52 173.25 111.79 179.79 113.83 186.42 115.87 193.15 117.92 199.97 119.98 206.89 122.05 213.90 122.58 218.28

Total Volume sampah ke TPA 271.80 290.13 303.97 322.64 341.68 361.11 379.88 395.07 410.50 424.15 438.32 452.64 458.82 468.37 479.29 489.05 498.90 508.83 518.84 528.92 537.27

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

zona I zona I Total SampSampah BaSampah KeTotal SampSampah Ba 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.36 2.35 4.83 3.38 1.45 4.31 3.02 6.79 4.76 2.04 4.59 3.21 8.95 6.26 2.68 4.88 3.42 11.30 7.91 3.39 5.18 3.63 11.51 8.05 3.45 5.49 3.85 13.66 9.56 4.10 6.78 4.75 15.89 11.12 4.77 8.19 5.74 20.22 14.15 6.07 9.73 6.81 22.64 15.85 6.79 11.40 7.98 23.04 16.13 6.91 11.75 8.22 27.71 19.40 8.31 14.53 10.17 30.38 21.26 9.11 16.22 11.35 33.13 23.19 9.94 16.70 11.69 35.96 25.17 10.79 18.53 12.97 38.89 27.22 11.67 20.45 14.31 41.91 29.34 12.57 22.46 15.72 45.03 31.52 13.51 24.57 17.20 48.24 33.77 14.47 26.79 18.75 49.10 34.37 14.73 30.65 21.45

Pemilahan Sampah Zona I Zona II Zona III Sampah keSampah ba Sampah kering Sampah ba Sampah kering 52.09 40.11 22.73 41.49 23.52 55.12 42.92 24.33 47.18 26.74 58.23 45.83 25.98 52.33 29.66 61.45 48.83 27.68 57.70 32.70 64.76 51.94 29.44 63.27 35.87 68.16 55.14 31.25 69.08 39.15 69.38 58.45 33.13 76.30 43.25 70.61 61.86 35.06 83.81 47.51 71.87 65.39 37.06 91.63 51.94 73.15 69.02 39.12 99.75 56.54 74.45 72.77 41.25 108.20 61.33 75.78 75.00 42.51 113.82 64.52 77.13 77.28 43.80 119.64 67.82 78.50 79.62 45.13 125.67 71.23 79.90 82.02 46.49 131.90 74.77 81.32 84.48 47.89 138.36 78.42 82.77 87.01 49.32 145.04 82.21 84.25 89.61 50.79 151.95 86.13 85.75 92.27 52.30 159.11 90.18 87.27 95.00 53.85 166.50 94.38 88.83 97.81 55.44 174.16 98.72

Residu Sampah di TPS 3R dan TPST Zona I Zona II Zona III 2015 0.00 0.00 0.00 2016 0.00 1.18 0.00 2017 1.69 1.51 0.57 2018 2.38 1.61 0.95 2019 3.13 1.71 1.39 2020 3.95 1.81 1.89 2021 4.03 1.92 2.09 2022 4.78 2.37 2.76 2023 5.56 2.87 3.52 2024 7.07 3.40 4.37 2025 7.92 3.99 5.93 2026 8.06 4.11 6.24 2027 9.70 5.08 7.21 2028 10.63 5.67 8.27 2029 11.59 5.84 9.40 2030 12.58 6.48 10.62 2031 13.61 7.15 11.92 2032 14.66 7.86 13.33 2033 15.75 8.60 14.82 2034 16.88 9.37 16.43 2035 17.18 10.72 19.09

Tahun

zona I

zona I Sampah KeTotal SampSampah BaSampah Kering 0.00 0.00 0.00 0.00 1.01 0.00 0.00 0.00 1.29 1.64 1.15 0.49 1.38 2.71 1.90 0.81 1.46 3.97 2.78 1.19 1.55 5.41 3.79 1.62 1.65 5.98 4.18 1.79 2.04 7.88 5.51 2.36 2.46 10.05 7.03 3.01 2.92 12.50 8.75 3.75 3.42 16.95 11.87 5.09 3.52 17.83 12.48 5.35 4.36 20.62 14.43 6.19 4.86 23.63 16.54 7.09 5.01 26.86 18.81 8.06 5.56 30.35 21.24 9.10 6.13 34.08 23.86 10.23 6.74 38.09 26.66 11.43 7.37 42.37 29.66 12.71 8.04 46.95 32.87 14.09 9.19 54.57 38.20 16.37 Total residu sampah 0.00 1.18 3.77 4.93 6.23 7.66 8.04 9.91 11.94 14.85 17.84 18.41 21.99 24.56 26.83 29.68 32.68 35.85 39.17 42.68 46.99

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Volume sampah Residu Jumlah terlayani Sampah Sampah yang di TPST ke TPA langsung 0.00 271.80 ke271.80 TPA 290.13 1.18 291.31 303.97 3.77 307.74 322.64 4.93 327.57 341.68 6.23 347.91 361.11 7.66 368.77 379.88 8.04 387.92 395.07 9.91 404.98 410.50 11.94 422.44 177.14 14.85 191.99 240.29 17.84 258.13 252.90 18.41 271.31 292.55 21.99 314.54 335.39 24.56 359.95 381.56 26.83 408.39 431.23 29.68 460.91 484.58 32.68 517.26 508.83 35.85 544.68 518.84 39.17 558.02 528.92 42.68 571.60 537.27 46.99 584.26

Volume sampah ke kontainer Zona I Zona II Zona III S. Basah S. Kering S. Basah S.kering S.basah S.kering 91.89 52.09 40.11 22.73 41.49 23.52 97.24 55.12 40.57 23.32 47.18 26.74 99.36 56.79 42.82 24.69 51.18 29.17 103.65 59.41 45.62 26.30 55.80 31.89 107.98 62.07 48.52 27.97 60.50 34.68 112.34 64.77 51.51 29.70 65.29 37.53 114.34 65.93 54.60 31.48 72.11 41.45 115.01 66.51 57.11 33.03 78.30 45.14 115.67 67.10 59.65 34.60 84.59 48.92 114.90 67.08 62.21 36.20 91.00 52.79 115.51 67.66 64.79 37.83 96.34 56.25 117.56 68.87 66.77 38.98 101.34 59.17 116.67 68.81 67.11 39.44 105.21 61.63 117.23 69.39 68.27 40.26 109.13 64.14 117.77 69.96 70.33 41.48 113.10 66.71 118.30 70.53 71.51 42.33 117.12 69.32 118.80 71.10 72.70 43.19 121.18 71.99 119.29 71.67 73.89 44.05 125.29 74.70 119.75 72.24 75.07 44.93 129.44 77.47 120.20 72.80 76.25 45.81 133.64 80.29 122.34 74.10 76.35 46.25 135.96 82.34

Tahun

0 0 0 0 0 0 0 0 0 0

0 0 0 0 Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Volume sampah Jalan Jumlah becak sampah yang dibutuhkan Zona I Zona II Zona III Zona I Zona II Zona III 0.99 0.43 0.45 1 1 1 1.05 0.46 0.51 1 1 1 1.11 0.50 0.57 1 1 1 1.17 0.53 0.62 1 1 1 1.23 0.56 0.68 1 1 1 1.30 0.60 0.75 1 1 1 0.00 0.63 0.82 2 1 1 1.35 0.67 0.91 2 1 1 1.37 0.71 0.99 2 1 1 1.40 0.75 1.08 2 1 1 1.42 0.79 1.17 2 1 1 1.45 0.81 1.23 2 1 2 0.00 0.84 1.29 2 1 2 0.00 0.86 1.36 2 1 2 0.00 0.89 1.43 2 1 2 0.00 0.91 1.50 2 1 2 1.58 0.94 1.57 2 1 2 1.61 0.97 1.64 2 1 2 1.64 1.00 1.72 2 1 2 0.00 1.03 1.80 2 1 2 1.69 1.06 1.88 2 1 2 1.45

2015 2016 2017 2018 2019 2020 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2035 0 0 Residu Sampah (m3/h) Zona I Zona II Zona III 0 0 0 0 1.18 0 1.69 1.51 0.57 2.38 1.61 0.95 3.13 1.71 1.39 3.95 1.81 1.89 4.03 1.92 2.09 4.78 2.37 2.76 5.56 2.87 3.52 7.07 3.40 4.37 7.92 3.99 5.93 8.06 4.11 6.24 9.70 5.08 7.21 10.63 5.67 8.27 11.59 5.84 9.40 12.58 6.48 10.62 13.61 7.15 11.92 14.66 7.86 13.33 15.75 8.60 14.82 16.88 9.37 16.43 17.18 10.72 19.09

kontainer yang dibutuhkan Zona I Zona II Zona III 0 0 0 1 0 0 0 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 2 2 1 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Volume Sampah yang diolah di TPS3R/ TPST (m3/h) Pengomposan Zona I Zona II Zona III 0.00 0.00 0.00 0.00 1.48 0.00 2.13 1.90 0.72 3.00 2.02 1.20 3.95 2.15 1.75 4.99 2.29 2.39 5.07 2.42 2.64 6.02 2.99 3.47 7.01 3.61 4.43 8.92 4.29 5.51 9.98 5.03 7.48 10.16 5.18 7.86 12.22 6.41 9.09 13.40 7.15 10.42 14.61 7.37 11.85 15.86 8.17 13.38 17.15 9.02 15.03 18.48 9.91 16.80 19.86 10.84 18.69 21.28 11.81 20.71 21.65 13.51 24.06

Zona I 0.00 0.00 1.01 1.42 1.87 2.36 2.41 2.86 3.32 4.23 4.73 4.82 5.80 6.35 6.93 7.52 8.13 8.77 9.42 10.09 10.27

Daur Ulang Zona II Zona III 0.00 0.00 0.70 0.00 0.90 0.34 0.96 0.57 1.02 0.83 1.08 1.13 1.15 1.25 1.42 1.65 1.71 2.10 2.04 2.62 2.38 3.55 2.46 3.73 3.04 4.31 3.39 4.94 3.49 5.62 3.88 6.35 4.28 7.13 4.70 7.97 5.14 8.86 5.60 9.82 6.41 11.41

Residu Sampah (m3/h) Zona I 0.00 0.00 1.69 2.38 3.13 3.95 4.03 4.78 5.56 7.07 7.92 8.06 9.70 10.63 11.59 12.58 13.61 14.66 15.75 16.88 17.18

Zona II 0.00 1.18 1.51 1.61 1.71 1.81 1.92 2.37 2.87 3.40 3.99 4.11 5.08 5.67 5.84 6.48 7.15 7.86 8.60 9.37 10.72

Zona III 0.00 0.00 0.57 0.95 1.39 1.89 2.09 2.76 3.52 4.37 5.93 6.24 7.21 8.27 9.40 10.62 11.92 13.33 14.82 16.43 19.09

zona I zona I zona I Total Sampah Total Sampah Total Sampah Sampah Basah Sampah Kering Sampah Basah Sampah Kering Sampah Basah Sampah Kering 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 1.01 3.36 0.00 0.00 0.00 3.38 1.45 4.83 3.02 1.29 4.31 1.15 0.49 1.64 4.76 2.04 6.79 3.21 1.38 4.59 1.90 0.81 2.71 6.26 2.68 8.95 3.42 1.46 4.88 2.78 1.19 3.97 7.91 3.39 11.30 3.63 1.55 5.18 3.79 1.62 5.41 8.05 3.45 11.51 3.85 1.65 5.49 4.18 1.79 5.98 9.56 4.10 13.66 4.75 2.04 6.78 5.51 2.36 7.88 11.12 4.77 15.89 5.74 2.46 8.19 7.03 3.01 10.05 14.15 6.07 20.22 6.81 2.92 9.73 8.75 3.75 12.50 15.85 6.79 22.64 7.98 3.42 11.40 11.87 5.09 16.95 16.13 6.91 23.04 8.22 3.52 11.75 12.48 5.35 17.83 19.40 8.31 27.71 10.17 4.36 14.53 14.43 6.19 20.62 21.26 9.11 30.38 11.35 4.86 16.22 16.54 7.09 23.63 23.19 9.94 33.13 11.69 5.01 16.70 18.81 8.06 26.86 25.17 10.79 35.96 12.97 5.56 18.53 21.24 9.10 30.35 27.22 11.67 38.89 14.31 6.13 20.45 23.86 10.23 34.08 29.34 12.57 41.91 15.72 6.74 22.46 26.66 11.43 38.09 31.52 13.51 45.03 17.20 7.37 24.57 29.66 12.71 42.37 33.77 14.47 48.24 18.75 8.04 26.79 32.87 14.09 46.95 34.37 14.73 49.10 21.45 9.19 30.65 38.20 16.37 54.57

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

Zona I

Timbulan yang diangkut (m3/h) Zona II Zona III 0.00 0.00 0.00 2.35 3.38 3.02 4.76 3.21 6.26 3.42 7.91 3.63 8.05 3.85 9.56 4.75 11.12 5.74 14.15 6.81 15.85 7.98 16.13 8.22 19.40 10.17 21.26 11.35 23.19 11.69 25.17 12.97 27.22 14.31 29.34 15.72 31.52 17.20 33.77 18.75 34.37 21.45

0.00 0.00 1.15 1.90 2.78 3.79 4.18 5.51 7.03 8.75 11.87 12.48 14.43 16.54 18.81 21.24 23.86 26.66 29.66 32.87 38.20

Kebutuhan Becak motor Zona I Zona II Zona III 0 0 0 1 1 1 2 1 2 1 2 1 2 1 3 2 3 2 4 2 4 2 4 2 5 3 5 3 6 3 6 3 6 4 7 4 8 4 8 5 8 5

0 0 2 2 2 2 2 2 2 2 3 3 4 4 5 5 6 6 7 8 9

Tahun Timbulan sampah (m3/h)

Jenis Sarana*

Jumlah Ritasi Pengadaan becak motor

BS/GS (1 m3) S. Basah 2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

7.63 8.07 8.53 9 9.48 9.98 10.16 24.32 24.75 25.19 25.64 26.1 26.56 27.03 35.33 35.95 36.59 37.25 37.91 38.58 39.27

Becak motor (1,5 m3)

S. S. basah S. Kering Kering 4.32 4.57 4.83 5.1 5.37 5.66 5.76 13.78 14.03 14.28 14.53 14.79 15.06 15.32 20.02 20.38 20.74 21.11 21.49 21.87 22.26

1 1 1 1

Tahun Timbulan sampah (m3/h)

2 2 2 2

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

17.34 17.67 18.01 18.36 18.71 19.07 19.44 19.81 20.19 20.58 20.97 21.38 21.79 22.21

3 3 3 3 3 3 3 6 6 6 6 6 6 6 8 8 9 9 9 9 9

BS/GS 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4 4 4 4 4 3 3

Becak Motor S. basah 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 2 2

1 1 5 2

1 1 2 6 2 1 1 1 2

Jumlah Ritasi

Becak motor (1,5 m3)

S. S. basah S. Kering Kering 9.83 10.02 10.21 10.41 10.61 10.81 11.02 11.23 11.44 11.66 11.89 12.12 12.35 12.59

S. Kering

Jenis Sarana

BS/GS (1 m3) S. Basah

S. Basah

S. Basah

pengadaan becak motor

S. Kering 4 4 4 5 5 5 5 5 5 5 5 5 5 5

BS/GS 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Becak Motor 1 1 1 1 1 1 1 1 1 1 1 1 1 1

s. Basah 3 3 3 3 3 3 3 3 3 3 3 3 3 3

1 1 5

1 1 1

2029 2030 2031 2032 2033 2034 2035

22.63 23.07 33.26 33.89 34.55 35.21 35.89

12.83 13.08 18.85 19.21 19.58 19.96 20.34

5 5 5 5 5 6 6 2=2012

Jenis Sarana

BS/GS (1 m3)

2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

12.79 13.08 13.38 13.68 13.99 14.31 14.64 14.97 15.31 15.66 16.01 16.38 16.75 39.88 40.79 41.72 42.66 43.63 44.62 45.64 46.67

11 11 11 11 11 11

Volume sampah Jalan (m3/h) Tahun 2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024

3 3 3 3 3 3 3

5

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

13 13 13 14 14 14 17 21 21 21 20 20 20 20 22 22 28 28 28 30 30

4

1 1

Zona I Zona II Zona III 0.99 0.43 0.45 1.05 0.46 0.51 1.11 0.5 0.57 1.17 0.53 0.62 1.23 0.56 0.68 1.3 0.6 0.75 1.32 0.63 0.82 1.35 0.67 0.91 1.37 0.71 0.99 1.4 0.75 1.08

Jumlah Ritasi

Becak motor (1,5 m3)

S. S. basah S. Kering Kering 7.25 7.42 7.58 7.76 7.93 8.11 8.3 8.49 8.68 8.88 9.08 9.28 9.49 22.61 23.12 23.65 24.18 24.73 25.29 25.87 26.46

1 1 1 1 1 1 1

5=2014

Tahun Timbulan sampah (m3/h)

S. Basah

2 2 2 2 2 2 2

7 7 7 7 7 7

S. Basah

S. Kering

2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 8 8 8 9 9 pengadaan 2013

BS/GS 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 2 2 2 2 2

Becak Motor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Jumlah gerobak sampah yang dibutuhkan* Pengadaan gerobak sampah Zona I

Zona II 1 1 1 1 1 1 2 2 2 2

Zona III 1 1 1 1 1 1 1 1 1 1

Zona I 1 1 1 1 1 1 1 1 1 1

Zona II

1 1

Zona III

1

1

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

1.42 1.45 1.47 1.5 1.52 1.55 1.58 1.61 1.64 1.66 1.69

0.79 0.81 0.84 0.86 0.89 0.91 0.94 0.97 1 1.03 1.06

1.17 1.23 1.29 1.36 1.43 1.5 1.57 1.64 1.72 1.8 1.88

2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1

Jumlah Kontainer (buah) Kontainer 6 m

3

Zona I 13 18 18 18 18 15 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0

0 6 7 7 7 10 15 18 18 23 23 23 23 23 23 24 24 24 24 24 25

Zona II 0 8 8 9 10 10 11 11 12 12 13 13 13 14 14 14 14 15 15 15 15

1

1

1 1

1

1

1

Jumlah Amroll Truck(buah)

Kontainer 8 m3

Zona I Tahun 2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

1 2 2 2 2 2 2 2 2 2 2

Amroll Truck 8 m3

Dump Truck 8 m3

Zona III 0 9 10 10 12 13 14 15 17 18 19 20 21 22 23 23 24 25 26 27 28

Zona I Zona I 7 7 7 7 7 5 4 2 2 0 0 0 0 0 0 0 0 0 0 0 0

0 4 4 4 4 5 8 9 9 12 12 12 12 12 12 12 12 12 12 12 13 2012=2

Zona II 0 4 4 5 5 5 6 6 6 6 7 7 7 7 7 7 7 8 8 8 8 2013=3

Jumlah Ritasi*

Zona III 0 5 5 5 6 7 7 8 9 9 10 10 11 11 12 12 12 13 13 14 14 2014=2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Pengadaan becak motor

Tahun S. kering

2015 (eksisting)*** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

1 2 1 1

1 2 1 3

1 1

Volume Sarana sampah pewadahan yang Pengadaa Komunal masuk Kontain Kontain n ke TPA er 6 er 8 kontainer (m3/h)* m3** m3** 6 m3 143.97 152.34 160.96 157.95 166.45 175.21 178.33 171.75 174.81 177.92 181.09 184.32 187.6 190.94 176.67 179.82 183.02 186.28 189.6 192.97 196.41

2 pengadaan BS 2012

pengadaan becak motor

2014

13 18 18 18 18 15 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0

0 6 7 7 7 10 15 18 18 23 23 23 23 23 23 24 24 24 24 24 25 12=3

Tahun

Volume sampah yang masuk ke TPA (m3/h)*

5

13=5

Sarana pewada han penambah Komuna an l Kontainer (Kontai Pergantia 8 m3 ner 8 ) n m3** Kontainer

s. kering

3 0 1

1 3

2015 (eksisting)*** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

62.84 67.25 68.21 72.68 77.3 82.07 86.99 92.07 97.31 98.4 103.75 106.92 110.17 113.51 116.93

0 8 8 9 10 10 11 11 12 12 13 13 13 14 14

9 0 0 0 1 1 1 0 0 1 1 0 0 1

0 0 0 0 0 1 1 2 5

1 2

2030 2031 2032 2033 2034 2035

1 2

1

Tahun penamba pergantia pengadaa han n n 0 0 0 1 0 0 3 4 0 0 0 0 0 0 2 0 6 0 0 2 2 2009=5

0 0 5 1 2 0 7 6 0 0 5 1 2 3 6 4 8 0 5 3 2

5 0 2 0 4 2

5 1 2 3 4 4 2 0 5 1 0 2011=2

2015 (eksisting)*** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

2013=4

115.15 118.6 112.31 115.65 119.07 122.58

Volume sampah yang masuk ke TPA (m3/h)* 65 73.91 81.99 86.77 95.16 103.89 114.75 126.05 129.19 140.65 152.57 160.49 168.7 167.35 175.65 184.25 181.78 190.45 199.41 208.68 218.28

14 14 15 15 15 15

0 0 0 0 0 0

Sarana pewada han Komuna l (Kontai Pengadaa Pergantia ner 8 ) n n m3** Kontainer Kontainer 0 9 10 10 12 13 14 15 17 18 19 20 21 22 23 23 24 25 26 27 28

9 1 1 1 1 2 1

1 2 3 3 1 1 1 1 3 3 5 3 2 2 1

2 1 1 1 0 1 1 0 1 1 1 1

2014=2 Residu Sampah (m3/h)

3 3 3 3 3 3 4 4 4 4

2 3 4 1 1

penamba pergantia pengadaa han n n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 1 0 1 0 0 0 0 0 0 0 0 0

Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Zona I 0 0 0 4.16 4.38 4.61 4.7 8.19 8.34 8.49

Zona II Zona III 0 0 0 0 1.26 0 1.34 1.26 1.42 1.39 1.51 1.51 1.6 1.67 1.7 1.84 1.79 5.02 3.4 5.47

kontainer yang dibutuhkan* Zona I 0 0 1 1 1 1 1 2 2 2

4 0 5 1 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 asumsi pengadaan 2013

0 0 3 1 0 0 0 0 0 1 3

0 0 3 1 0 0 0 0 0 1 3

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

8.64 8.79 8.95 9.11 15.45 15.73 16.01 16.29 16.58 16.88 17.18

3.59 3.7 3.81 3.93 4.05 6.02 6.2 9.82 10.11 10.41 10.72

pengdaan Amroll truck Zona I

4

Zona II

5

Zona III

5 1 1

1 3 1

1 1

1 1

3

5

6

1

2 1

0 0 0 0 0 0 0 0 1

1 1 5 1

2 1 1 6 3 1

0 13 13 14 15 17 21 23 24 27 29 29 30 30 31 31 31 33 33 34 35

penamba pergantia pengadaa han n n 0 13 0 13 0 0 0 1 0 1 1 0 1 2 0 2 4 1 5 2 2 4 1 4 5 3 3 6 2 0 2 0 1 1 1 5 6 0 2 2 1 5 6 0 5 5 0 5 5 2 6 8 0 1 1 1 2 3 1 0 1

5.93 6.24 6.56 10.33 10.84 11.37 15.9 16.66 17.44 18.25 19.09

2 2 3 3 3 3 3 4 4 4 4

Pengadaa n pergantia kontainer n 8 m3 kontainer

6 1 0 0 3 5 3 0 5 0 0 1 0 0 0 0 0 0 0 1

0 0 0 0 0 1 1 1 3 1 0 0 3 5 3 0 5 0 0 1

5 5 9 9 9 9 9 9 13 13

14=5

Pengadaa n kontainer

9 0 0 0 1 2 2 2 5 1 1 0 1 3

1 2 3 4 5 6 7

0 0 0 0 0 0 0 0

0 0 0 0

2 3 4 1 1

Pengadaa n kontainer penamba pergantia pengadaa han n n 9 1 1 1 1 3 3 3 5 2 2 2 1 4 4 5 4 3 3 2

kontainer yang dibutuhkan* Zona II Zona III 0 0 1 0 1 0 1 1 1 1 1 1 1 1 2 2 2 2 2 2

0 24 27 29 32 36 43 50 53 59 61 62 66 68 69 70 71 76 77 78 80

24 3 2 3 4 7 7 3 6 2 1 4 2 1 1 1 5 1 1 2

12 12 3 2 3 4 7 7 15 18 5 3 7 6

Pengadaan Kontainer Zona I

Zona II

Zona III 1

1

1

1

24 3 2 3 4 7 19 15 9 4 4 8 9 8 16 19 10 4 8 8

5

2 2 3 3 3 3 3 4 4 4 4

2 2 3 3 3 3 3 4 4 4 4

1

1 1

1

1

1 1

1

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0

0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0

0 0

0

0 0 0 0

0

5.18

Tahun

Luas Jumlah Tinggi Faktor Volume TPA Sampah timbuna pemadat terpadatk yang ke TPA n an an dibutuhk (m3/h) rencana an (Ha)

2015

271.80

1.2

226.50

10

0.55

0.55

2016

291.31

1.2

242.76

10

0.59

1.13

2017 2018

307.74 327.57

1.2 1.2

256.45 272.97

10 10

0.62 0.66

1.75 2.41

2019

347.91

1.2

289.92

0.70

3.11 3.11

2020

368.77

1.2

307.31

0.74

3.85

2021

387.92

1.2

323.27

0.78

4.63

2022

404.98

1.2

337.48

0.82

5.45

2023

422.44

1.2

352.03

0.85

6.30

2024

191.99

1.2

159.99

0.39

6.69

2025

258.13

1.2

215.11

0.52

7.21

2026

271.31

1.2

226.09

10 10 10 10 10 10 10 10

0.55

7.75

2027

314.54

1.2

262.12

0.63

8.38

2028

359.95

1.2

299.96

0.72

9.11

2029

408.39

1.2

340.32

0.82

9.93

2030

460.91

1.2

384.09

0.93

10.86

2031

517.26

1.2

431.05

1.04

11.90

2032 2033

544.68 558.02

1.2 1.2

453.90 465.01

1.10 1.12

13.00 14.12

2034

571.60

1.2

476.33

1.15

15.27

2035

584.26

1.2

486.88

10 10 10 10 10 10 10 10 10

1.18 16.45

16.45

89.2

22.95

287.9 11.5 388.6

74.09 2.96

8 5.926917

Ruang Pencurahan dan pemilahan Sampah Basah

24

2

Ruang pencacahan Sampah basah

14

1

44.4

2

Ruang pengayakan kompos

9

2

Ruang pengemasan kompos

12

1

Ruang pengomposan

Bank Sampah

6

1

Ruang pencucian dan pengemasan sampah kering daur ulang

12

2

Gudang penyimpanan Kompos dan sampah daur ulang

8.5 -

Lahan penampungan residu sampah

6 -

Ruang kantor dan pos jaga

10.5

Mobilisasi

38.6 -

Area Parkir

Ruang Pencurahan dan pemilahan Sampah Basah Ruang pencacahan Sampah basah Ruang pengomposan Ruang pengayakan kompos Ruang pengemasan kompos Bank Sampah Ruang pencucian dan pengemasan sampah kering daur ulang Gudang penyimpanan Kompos dan sampah daur ulang Lahan penampungan residu sampah Ruang kantor dan pos jaga Mobilisasi Area Parkir

1

24 209

12

44 15 81 12 12 6

2 1 2 2 1 1

20 18 6 14 352.5 50 402.5

2 1 12

Ruang Pencurahan dan pemilahan Sampah Basah Ruang pencacahan Sampah basah Ruang pengomposan Ruang pengayakan kompos Ruang pengemasan kompos Bank Sampah Ruang pencucian dan pengemasan sampah kering daur ulang Gudang penyimpanan Kompos dan sampah daur ulang Lahan penampungan residu sampah Ruang kantor dan pos jaga Mobilisasi Area Parkir

50 28 120 12 12 6

3 1 3 2 1 1

22 30 6 12 Err:522 48 494

2

Err:522

1 14

Tabel 8.5 Rancangan Anggaran Biaya Pengelolaan Persampahan Kota Bu No

Jeni/Alat

1 Aspek Teknis a. Pewadahan Kontainer 6 m3 Konatainer 8 m3 b. pengumpulan becak motor 1,5 m3 Gerobak sampah 1 m3 c. pengangkutan Amroll truck 8 m3 d. Pengolahan

Harga Satuan

Satuan

19,000,000 unit 27,000,000 unit

2016

5 24

24,071,000 unit 1,700,000 unit 390,923,150 unit

Jumlah 2018

2017

3

3

5

1

13

1

2

Optimalisasi TPS 3R Aur Kuning (Zona II) - penamabahan bangunan - Komposter takakura - mesin pencacah - alat pengayak manual - timbangan - sekop - gerobak dorong -Troli Barang -termometer -cangkul 3 2. TPS 3R Tipe I di Zona III - penamabahan bangunan - Komposter takakura - mesin pencacah '- alat pengayak manual - timbangan - sekop - gerobak dorong -Troli Barang -termometer -cangkul 4 3. TPS 3R Tipe II - penamabahan bangunan - Komposter takakura - mesin pencacah '- alat pengayak manual - timbangan - sekop - gerobak dorong -Troli Barang -termometer -cangkul No B 1. 2

Jeni/Alat

1,500,000 250,000 16,500,000 11,000,000 300,000 20,000 350,000 900,000 20,000 50,000

m3 unit

137 14

unit unit unit unit unit unit unit

1 1 2 2 1 1 2

1,500,000 250,000 16,500,000 100,000 11,000,000 20,000 350,000 900,000 20,000 50,000

m3 unit

200

2.5 14 1 1 1 2 2 1 1 2

202.5

200.0 28 1 1 1 2 2 1 1 2

unit unit unit

1,500,000 m3 250,000 16,500,000 11,000,000 300,000 20,000 350,000 900,000 20,000 50,000 Harga Satuan

Satuan

2016

14

Jumlah 2018

2017

Aspek non Teknis Sosialisasi peraturan, perundangan dan sosialisai tentang Perda pengelolaan sampah serta tetribusi pelayanan persampahan/ kebersihan Sosialisasi Pengolahan sampah dengan metode 3R dengan masyarakat

5,000,000 Kali

3

3

3

5,000,000 Kali

3

3

3

3

Pelatihan teknis SDM untuk pengelolaan sampah

Kali

1

4

Pemantauan dan persampahan

pelayanan

5,000,000 Kali

3

5

Penguatan kelembagaan stekholder bidang persampahan (pola hubungan RT, RW , kelurahan, Kecamatan dengan DKP Kota Bukittinggi)

10,000,000 Kali

3

6

Sosialisasi sembarangan

5,000,000 Kali

3

3

3 12

evaluasi

prilaku

tidak

pelaksanaan

membuang

1,000,000

sampah

2

3

7

Sosialisasi dan kampanye tatacara pemilahan sampah dari sumbernya

dan gerakan

5,000,000 Kali

12

12

8

Pelatihan tentang pengolahan sampah untuk Kelompok Swadaya Masyarakat (KSM) yang peduli lingkungan Sosialisasi tentang bank sampah. Total (Rp)

Kali 10,000,000 5,000,000 Kali

1

2

3

3

9

3

lolaan Persampahan Kota Bukittinggi Jangka Pendek (2016-2020) Jumlah 2019

2020

Rencana Anggaran Biaya 2018

2016

2017

105,000,000 504,000,000

63,000,000

2019

2020

63,000,000

63,000,000

84,000,000

3

4

2

0 3

0

105,000,000

21,000,000

42,000,000

0 63,000,000

1

2

273,000,000

0

21,000,000

21,000,000

42,000,000

205,500,000 3,500,000

14

3,500,000

11,000,000 300,000 40,000 700,000 900,000 20,000 100,000 300,000,000 14

303,750,000 14

14

0 0 Jumlah 2019

2020

2016 0

3 3

3,750,000 3,500,000 16,500,000 100,000 11,000,000 40,000 700,000 900,000 20,000 100,000 300,000,000 0 7,000,000 2,800,000 16,500,000 11,000,000 300,000 40,000 700,000 900,000 20,000 0 100,000 0 Rencana Anggaran Biaya 2017 2018 0 0

2,800,000

2,800,000

0 0

0 0

2019

2020 0

0

3 3

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

3

3

2,000,000

0

0

0

15,000,000

0

0

0

15,000,000

30,000,000

0

30,000,000

30,000,000

30,000,000

15,000,000

15,000,000

15,000,000

15,000,000

15,000,000

60,000,000

60,000,000

60,000,000

65,000,000

60,000,000

10,000,000 15,000,000 1,778,812,016

20,000,000 15,000,000 683,172,017

0 15,000,000 257,802,018 3,363,890,090

0 15,000,000 287,302,019

0 15,000,000 356,802,020

3

3

3

13

12

3

1,000,000

3

Tabel 8.1 Rencana Program dan Kegiatan Pengelolaan Persampahan Tahun 2016-2020

No

Program dan Kegiatan

Detail Lokasi

1

2

3

A. Aspek Teknis 1.

2. 3

Penambahan sarana pewadahan, pengumpulan dan pengangkutan sampah a. Kontainer 6 m3 Kota Bukittinggi b.Kontainer 8 m3 c. becak motor 1,5 m3 d. Gerobak sampah d. Amroll Truck Optimalisasi TPS 3R Tipe I Kelurahan Aur Kuning Zona II a. Pembangunan TPS 3R tipe II Kayu Kubu (Zona I) Kelurahan Pulai Anak Aia b. pembangunan TPS 3R tipe I (Zona III)

4

Penutupan TPA sampah Panorama Baru

Kota Bukittinggi

5

Studi pemilihan lokasi TPA sampah

Kota Bukittinggi

B

Aspek non Teknis

1.

seluruh Kecamatan Kota Sosialisasi peraturan, perundangan dan sosialisai tentang Perda Bukittinggi pengelolaan sampah serta tetribusi pelayanan persampahan/ kebersihan

2

Sosialisasi Pengolahan sampah dengan metode 3R dengan masyarakat

seluruh Kecamatan Kota Bukittinggi

3

Pelatihan teknis SDM untuk pengelolaan sampah

Kelurahan Aur Kuning, Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia

4

Pemantauan dan evaluasi pelaksanaan pelayanan persampahan

seluruh Kecamatan Kota Bukittinggi

Kali

5 6 7

Kelurahan Aur Kuning, Penguatan kelembagaan stekholder bidang persampahan (pola hubungan Kelurahan Kayu Kubu, RT, RW , Kelurahan, Kecamatan dengan DKP Kota Bukittinggi) Kelurahan Pulai Anak Aia seluruh Kecamatan Kota Sosialisasi prilaku tidak membuang sampah sembarangan Bukittinggi Kelurahan Aur Kuning, Sosialisasi dan kampanye tatacara dan gerakan pemilahan sampah dari Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia sumbernya

8

Kelurahan Aur Kuning, Pelatihan tentang pengolahan sampah untuk Kelompok Swadaya Kelurahan Kayu Kubu, Masyarakat (KSM) yang peduli lingkungan Kelurahan Pulai Anak Aia

9

Sosialisasi tentang bank sampah.

Kelurahan Aur Kuning, Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia

VIII-3

an Persampahan Tahun 2016-2020

Kebutuhan Penanganan Menyeluruh Volume Satuan 2016 2017 2018 2019 4 5 6 7 8

unit unit unit

5 24

unit Kali Kali

13 1 1

1

Kali

1

1

3 5

3 1

3 2

2020 9

4 0 3

1

Kali

1

paket

1

Kali

3

3

3

3

3

Kali

3

3

3

3

3

Kali

1

2

Kali

3

Kali

3

Kali

3

Kali

3 3

3

3

3

3

3

3

12

12

12

13

12

Kali

1

2

Kali

3

3

3

3

3

VIII-3

No

Jeni/Alat

Harga Satuan

1 Aspek Teknis a. Pewadahan Kontainer 6 m3 Konatainer 8 m3 b. pengumpulan becak motor 1,5 m3 Gerobak sampah 1 m3 c. pengangkutan Amroll truck 8 m3 d. Pengolahan Optimalisasi TPS 3R Aur 2 Kuning (Zona II) 3 2. TPS 3R Tipe I di Zona III 4 3. TPS 3R Tipe II Total (Rp)

No

A. 1.

2. 3

4 5 B

18,000,000 unit 21,000,000 unit

2016

5 24

23,500,000 unit 3,000,000 unit 350,000,000 unit

2017

Jumlah 2018 2019

2020

4

1

3

4

6

1

3

4 3

1

1

2

13

paket paket paket

Program dan Kegiatan

Detail Lokasi

2

3

Penambahan sarana pewadahan, pengumpulan dan pengangkutan sampah a. Kontainer 6 m3 b.Kontainer 8 m3 c. becak motor 1,5 m3 d. Gerobak sampah d. Amroll Truck

Kota Bukittinggi

1

Satuan

Kebutuhan Penanganan Menyeluruh Volume Satuan 2016 2017 2018 2019 2020 4 5 6 7 8 9

Aspek Teknis

Kelurahan Aur Kuning Optimalisasi TPS 3R Tipe I Zona II a. Pembangunan TPS 3R tipe II Kayu Kubu (Zona I) Kelurahan Pulai Anak Aia b. pembangunan TPS 3R tipe I (Zona III) Penutupan TPA sampah Kota Bukittinggi Panorama Baru Studi pemilihan lokasi TPA sampah Kota Bukittinggi Kali Aspek non Teknis

unit unit unit

5 24

unit

13

Kali

1

Kali

1

1

Kali

1

1

3 5

3 1

3 2

4 0 3

1

Kali

1

paket

1

1.

Sosialisasi peraturan, perundangan dan sosialisai tentang Perda pengelolaan seluruh Kecamatan Kota sampah serta tetribusi Bukittinggi pelayanan persampahan/ kebersihan

Kali

3

3

3

3

3

2

Sosialisasi Pengolahan sampah seluruh Kecamatan Kota dengan metode 3R dengan Bukittinggi masyarakat

Kali

3

3

3

3

3

3

Pelatihan teknis SDM untuk pengelolaan sampah

Kelurahan Aur Kuning, Kali Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia

1

2

4

Pemantauan pelaksanaan persampahan

Kali

3

5

Penguatan kelembagaan stekholder bidang persampahan Kelurahan Aur Kuning, (pola hubungan RT, RW , Kelurahan Kayu Kubu, Kali kelurahan, Kecamatan dengan Kelurahan Pulai Anak Aia DKP Kota Bukittinggi)

3

6

Sosialisasi membuang sembarangan

Kali

3

7

Sosialisasi dan kampanye Kelurahan Aur Kuning, tatacara dan gerakan Kelurahan Kayu Kubu, Kali pemilahan sampah dari Kelurahan Pulai Anak Aia sumbernya

8

9

dan

evaluasi seluruh Kecamatan Kota pelayanan Bukittinggi

prilaku

tidak seluruh Kecamatan Kota sampah Bukittinggi

Pelatihan tentang pengolahan Kali sampah untuk Kelompok Kelurahan Aur Kuning, Swadaya Masyarakat (KSM) Kelurahan Kayu Kubu, yang peduli lingkungan Kelurahan Pulai Anak Aia Sosialisasi sampah.

tentang

bank

Kelurahan Aur Kuning, Kelurahan Kayu Kubu, Kali Kelurahan Pulai Anak Aia

3

3

3

3

3

3

3

3

12

12

12

13

12

1

2

3

3

3

3

3

Rencana Anggaran Biaya 2017 2018 2019

2016

2020

504,000,000

84,000,000

21,000,000

63,000,000

84,000,000

0

126,000,000

21,000,000

63,000,000

84,000,000

273,000,000

0

21,000,000

21,000,000

42,000,000

0 0 316,370,000 0 7,710,000 2,097,820,000 1,150,450,000 206,800,000 3,817,670,000

0 0

0 0

210,410,000 300,000,000

149,800,000 212,800,000

Tahap Jangka Pendek Jangka Menengah Jangka Panjang

Tahap Jangka Pendek Jangka Menengah Jangka Panjang

Tahap Jangka Pendek Jangka Menengah Jangka Panjang

24 3 3 3 4

becak motor 0 5 1 2 0

Jumlah Pewadahan Komunal Jumlah timbulan Konvesional Sistem 3R sampah Kota Terlayani (m3/h) Kontainer 8 m3 Kontainer 8 m3 383.38 48 36 489.73 61 61 672.08 84 80

gerobak sampah 0 0 0 0 3

Amroll truck 13 0 1 1 2

T im b u la n S a m p a h Ko ta (m 3 / h )

Tabel 8.4 Pengadaan jumlah sarana prasarana jangak pendek Kontainer tahun 6 m3 8 m3 2016 5 2017 2018 2019 2020

Jumlah Sarana Pengumpulan Sarana Pengangkutan 700.00 Jumlah timbulan Konvesional Sistem 3R Konvesional Sistem 3R sampah Kota 600.00Amroll Truck Terlayani (m3/h) Becak Motor Becak Motor Amroll Truck 383.38 85 14 24 22 500.00 489.73 109 20 31 29 672.08 149 31 42 35 400.00

Jumlah timbulan sampah Kota Terlayani (m3/h) Konvesional Sistem 3R 383.38 361.11 489.73 438.32 672.08 537.27

300.00 200.00 Jangka Pendek

Jangka Mene Tahp Pere

dek

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

172.83 175.91 179.04 182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01

62.84 67.25 71.80 76.51 81.37 86.39 91.57 96.92 102.44 108.13 114.01 117.49 121.07 124.73 128.50 132.36 136.32 140.39 144.56 148.84 153.23

65.00 73.91 81.99 90.39 99.13 108.22 119.53 131.30 143.55 156.28 169.52 178.32 187.44 196.88 206.65 216.76 227.23 238.06 249.26 260.86 272.84

300.66 317.07 332.83 349.12 365.97 383.38 403.24 423.78 445.03 467.00 489.73 505.68 522.11 539.02 556.43 574.34 592.78 611.76 631.29 651.40 672.08 Juml ah timbul an sampah Kota Terl ayani (m3/h) Konvesi onal Si stem 3R

Jangka Menengah Tahp Perencanaan

Jangka Panjang