Tabel 4.1 Proyeksi Penduduk dengan Metoda Aritmatika NO Xi
Tahun
1
2005
2
2006
3
2007
4
2008
5
2009
6 7 8 9 10 55 a = b = Y' =
2010 2011 2012 2013 2014
Pendd (Yi) Yrata-rata
38292 38464 38827 39135 39439 40841.5 41643 42254 42627 43457 44277 408,415
Xi 2
Xi.Yi
Y'
(Yi - Y')
(Yi -Y' )2
1
38,292
37,586
706
498770
4
76,928
38,309
155
23944
9
116,481
39,033
-206
42336
16
156,540
39,756
-621
385957
25
197,195
40,480
-1041
1083164
36 49 64 81 100 385
249,858 295,778 341,016 391,113 442,770 2,305,971
41,203 41,927 42,650 43,374 44,097 408,415
440 327 -23 83 180 0
193381 107096 540 6932 32315 2374436
36862.27 723.50 45258.87 + 245.88.X
Tabel 4.2 Proyeksi Penduduk dengan Metoda Logaritma NO. Xi 1 2 3 4 5 6 7 8 9 10 55 a = b = Y' =
Tahun
Pendd (Yi)
ln Xi
ln Xi2
Yi ln Xi
Y'
(Yi-Y')
(Yi-Y')2
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457 44,277 408,415
0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10
0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65
0.00 26,661.21 42,655.82 54,252.63 63,474.62 74,614.24 82,222.49 88,640.35 95,484.79 101,951.56 629,957.71
36,759 38,632 39,728 40,506 41,109 41,602 42,019 42,379 42,698 42,983 408,415
1533 -168 -901 -1371 -1670 41 235 248 759 1294 0.00
2350166 28379 812486 1879496 2789151 1692 55453 61289 576407 1675572 10230091
36758.975 2702.8692 45156.48+ (963.11 x ln Xi)
Tabel 4.3 Proyeksi Penduduk dengan Metoda Eksponensial NO Xi 1 2 3 4 5 6 7 8 9
Tahun
Pendd (Yi)
Xi2
ln Yi
Xi ln Yi
Y'
(Yi -Y' )
(Yi -Y' )2
2005 2006 2007 2008 2009 2010 2011 2012 2013
38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457
1 4 9 16 25 36 49 64 81
10.55 10.56 10.57 10.57 10.58 10.64 10.65 10.66 10.68
10.55 21.11 31.70 42.30 52.91 63.82 74.56 85.28 96.12
37,672 38,342 39,025 39,720 40,428 41,148 41,880 42,626 43,385
620 122 -198 -585 -989 495 374 1 72
384961 14775 39319 342574 977492 245358 139526 0 5118
10 55 ln a = b = Y' =
2014
44,277 408,415
100 385
10.70 106.16
106.98 585.34
44,158 408,385
119 30
14133 2163256
10.519 0.018 10.720.e^0.005.X
Tabel 4.4 Proyeksi Penduduk dengan Metoda Geometri NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a= b = Y' =
Tahun
Pendd (Yi)
ln Xi
ln Xi2
ln Yi
ln Xi ln Yi
Y'
(Yi - Y' )
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457 44,277 408,415
0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10
0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65
10.55 10.56 10.57 10.57 10.58 10.64 10.65 10.66 10.68 10.70 106.16
0.00 7.32 11.61 14.66 17.03 19.06 20.73 22.17 23.47 24.63 160.67
36,903 38,637 39,689 40,452 41,054 41,553 41,980 42,352 42,684 42,983 408,288
1389 -173 -862 -1317 -1615 90 274 275 773 1294 127
10.516 0.066 EXP(10.718+ (0.021 x ln X))
Tabel 4.5 Proyeksi Jumlah Penduduk Tahun 2013- 2027 No
Tahun
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Proyeksi Penduduk Aritmatika LogaritmaEksponensialGeometrik 38,292 38,292 38,292 38,292 38,464 38,464 38,464 38,464 38,827 38,827 38,827 38,827 39,135 39,135 39,135 39,135 39,439 39,439 39,439 39,439 41,643 41,643 41,643 41,643 42,254 42,254 42,254 42,254 42,627 42,627 42,627 42,627 43,457 43,457 43,457 43,457 44,277 44,277 44,277 44,277 44,821 43,240 44,945 43,255 45,544 43,475 45,745 43,505 46,268 43,692 46,560 43,736 46,991 43,892 47,389 43,952 47,715 44,078 48,233 44,153 48,438 44,253 49,092 44,342 49,162 44,417 49,966 44,520 49,885 44,571 50,856 44,689 50,609 44,717 51,762 44,850 51,332 44,856 52,683 45,002
Tabel 4.7 Hasil Proyeksi Pe
Penduduk
No
38,292 38,464 38,827 39,135 39,439 41,643 42,254 42,627 43,457 44,277
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25 26 27 28 29 30 31 32
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
52,056 52,779 53,503 54,226 54,950 55,673 56,397 57,120 57,844 58,567 59,291 60,014
44,988 45,114 45,234 45,349 45,459 45,565 45,667 45,765 45,860 45,952 46,041 46,126
53,622 54,577 55,549 56,538 57,545 58,570 59,613 60,674 61,755 62,855 63,974 65,113
45,148 45,287 45,421 45,549 45,672 45,791 45,906 46,016 46,123 46,227 46,328 46,425
21 22 23 24 25 26 27 28 29 30 31
Tabel 4.9 Rekapitulasi Peningkatan Jumlah Pendu No. Tahapan Proyek Jumlah Penduduk Persen Pelayanan Jumlah yang terlayani 1 2010 44277 0.55 24352 2 2020 52683 0.7 36878 3 2030 62855 0.8 50284
Tabel 4.8 Standar Pemakaian Air Kota 1001 Malam Standar Kebutuhan No
Jenis Fasilitas
Air Tahap I Tahap II
Kapasitas
Keteranga n
Rumah Tangga 1
2
3
Sambungan rumah
130
130
L/jiwa/hari
- Hidran umum Sekolah
30
30
L/jiwa/hari
- TK - SD - SMP - SMU
20* 40 50 80
20* 40 50 80
L/jiwa/hari L/jiwa/hari L/jiwa/hari L/jiwa/hari
PT/Akadem i
80
80
L/jiwa/hari
Peribadatan
10
10
L/jiwa/hari
- Rumah Sakit
500
500
L/tt/hari
Puskesmas
350
350
- Klinik
350
350
L/tt/hari L/tt/hari
Kesehatan
4
*data asumsi
4
- Apotek
350
350
L/h/unit *data DPU tahun 2010
Industri* Industri Besar 5
Karyawan Pria
60
60
L/o/h
Karyawan wanita
100
100
L/o/h
Karyawan Pria
60
60
L/o/h
Karyawan wanita
100
100
L/o/h
- Pasar - Toko - Restoran
5 3 15
5 3 15
L/m2/h L/o/h L/o/h
Perkantoran Besar
100
100
L/jiwa/hari
100 100
100 100
L/jiwa/hari L/jiwa/hari
300 10
300 10
L/tt/h L/td/h
30
30
L/o/h
3
3
L/o/h
Industri Kecil
Perdaganga n 6
7
8
Menengah Kecil Lain-lain - Hotel - Bioskop -Stadion Olahraga* - Terminal bus
*data asumsi
Data standarpemakaian air
Tabel 4.11 Rekapitulasi Kebutuhan Air Domestik Kota 1001 Malam Tahun Tahun Awal (2010) Jenis Sambungan SR HU Sambungan (%) 0.82 0.18 Jumlah Penduduk Yang Terlayani (Jiwa) 24352 Jumlah Pengguna (Jiwa) 19888 4465 Standar Kebutuhan Air (L/o/h) 130 30 Kebutuhan Air (L/det) 29.92 1.55 Total 31.47
Tahap I (2020) SR HU 0.82 0.18 36878 30117 6761 130 30 45.32 2.35 47.66
Tahap II (2030) SR HU 0.85 5.01 50284 42741 251921 130 30 64.31 87.47 151.78
Tabel 4.10 Jenis Pemukiman Penduduk Kota 100 No.
Jenis Rumah
1 2 3
Permanen Semi Perman Non perman
2010 65 25 10
Persen Jenis 2020 55 40 5
2030 65 30 5
Tabel 4.12 Rekapitulasi Penambahan Fasilitas Perkotaan K Jumlah No.
Jenis Fasilitas
Kapasitas
Data Awal (2009)
*Tahap I (2019)
*Tahap II (2029)
100 jiwa/unit 600 jiwa/unit 800 jiwa/unit 800 jiwa/unit 1500 jiwa/unit
23
30
35
30
35
40
1
Sekolah a. TK b. SD c. SMP d. SMU e. PT/Ak ademi
24
25
30
12
25
30
9
15
18
SOAL 18 25 19 7
4
Peribadatan - Mesjid
400 jiwa/unit 100 jiwa/unit 400 jiwa/unit
41
45
50
37
40
44
10
14
16
- Rumah 300 tt/unit Sakit 40 tt/unit Puskesmas
10
13
16
17
27
31
2 - Mushalla - Gereja
36 32 5
Kesehatan
3
4
- Klinik - Apotik Industri - Industri Besar - Industri Kecil
15 tt/unit 5 tt/unit
13 14
23 25
30 29
2 Ha/Unit
9
15
23
200 m2/Unit
17 23
30
5
12 8 9
4 12
Perdaganga n - Pasar
700 m2/unit
8
16
20
- Toko
50 m2/unit
255
305
330
5
3 250
- Restauran 50 m /unit 2
31
45
54 26
Perkantoran
6
- Kantor besar
1000 m2/unit
13
20
25
- Kantor Menengah
600 m2/unit
19
30
37
8
14 - Kantor kecil Lain-Lain - Hotel - Bioskop 7 - Stadion Olahraga - Terminal bus
300 m2/unit
25
35
43
50 tt/Unit
11
20
26
500 td/Unit 4 Ha
7
10
12
2
6
9
200 unit bus/Hari
2 6
10
20
6 2 1 1
Tabel 4.13 Rekapitulasi Kebutuhan Air Untuk Sarana Pendidikan No. 1 2 3 4 5
Jumlah (unit)
Sarana Pendidika n TK SD
Tahun Awal 23 30
SMP/MTS N SMU
24 12
PT/Akadem i
9
Tahap I
Tahap II
30 35 25
35 40 30
25 15
30 18
Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (jiwa/unit) an Air Tahun Awal (L/o/h) 20 0.53 100 40 8.33 600 800 800 1500
50 80
11.11 8.89
80
12.50 41.37
Kebutuhan Total
Tabel 4.14 Rekapitulasi Kebutuhan Air Untuk Sarana Peribadatan No. 1 2 3
Sarana Peribadata n Mesjid Mushalla Gereja
Jumlah (unit) Tahun Awal 41 37 10
Tahap I
Tahap II
45 40 14
50 44 16
Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (jiwa/unit) an Air Tahun Awal (L/o/h) 400 10 1.90 100 10 0.43 400 10 0.46
Kebutuhan Total
2.79
Tabel 4.15 Rekapitulasi Kebutuhan Air untuk Sarana Kesehatan No.
Sarana Kesehatan
Jumlah (unit) Tahun Awal
1
Rumah sakit
10
2 3 4
Puskesmas Klinik Apotek
17 13 14
Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (tt/unit) an Air Tahun Awal (L/tt/h) 300 500 17.36
Tahap I
Tahap II
13
16
27
31
40
23 30 25 29 Kebutuhan Total
15 5
350 350 350
2.75 0.79 0.28 21.19
Tabel 4.16 Rekapitulasi Kebutuhan Air untuk Sarana Perind Kriteria 2010 2020 Jumlah (unit) 2030 Kapasitas (m2/unit) P 2010 W Jumlah P 2020 Karyawa W n P 2030 W P Standar Kebutuhan Air (l/jiwa/hr) W P 2010 W Kebutuh P 2020 an Air W (l/dtk) P 2030 W
Industri Industri Kecil Besar 9 17 15 23 23 30 20000 200 720 27 1080 41 1200 37 1800 55 1840 48 2760 72 60 60 Kebutuhan Total 100 100 0.50 0.02 1.82 1.25 0.05 0.83 0.03 3.01 2.08 0.06 1.28 0.03 4.59 3.19 0.08 9.41
Tabel 4.17 Rekapitulasi Kebutuhan Air untuk Sarana Perdagangan No. 1 2 3
Sarana Perdagang an Pasar Toko Restoran
Jumlah (unit) Tahun Awal 8 255 35
Tahap I
Tahap II
16 20 305 330 45 54 Kebutuhan Total
Standar Kebutuhan Air (L/det) Kapasitas Kebutuh (m2/unit) an Air Tahun Awal (L/m2/h) 5 0.32 700 3 0.44 50 15 0.30 50 1.07
Tabel 4.18 Rekapitulasi Kebutuhan Air untuk Sarana Perkantoran No.
Sarana Perkantor an
Jumlah (unit)
Standar Kapasitas Kebutuh (m2/unit) an Air (L/o/h)
Kebutuhan Air (L/det)
1
Sarana Perkantor an Besar
2 3
Menengah Kecil
No.
Tahun Awal
Tahap I
Tahap II
13 19
20 30
25 37
25
35 43 Kebutuhan Total
Standar Kapasitas Kebutuh (m2/unit) an Air Tahun Awal (L/o/h) 100 1.50 1000 600 300
100 100
1.32 0.87 3.69
Tabel 4.19 Rekapitulasi Kebutuhan Air untuk Sarana Lain-lain No. 1 2
Sarana fasilitas
3
Hotel Bioskop Stadion Olahraga
4
Terminal Bus
Jumlah (unit) Tahun Awal 11 7 2
Tahap I
Tahap II
20 10 6
26 12 9
200 2
6 10 Kebutuhan Total
Tabel 4.20 Rekapitulasi Kebutuhan Air Kota 10 No.
1.
Parameter
2010 Kebutuhan Domestik Jumlah pend 44277 % Pelayanan 0.55
3
62855 0.8 2030 64.31 87.47 151.78
41.37 2.79
61.34 3.19
73.03 3.56
Kesehatan Industri Perdaganga n
21.19 1.82
28.85 3.01
35.21 4.59
1.07
1.57
1.85
Perkantoran Sarana lainnya TOTAL
3.69
5.61
6.96
2.73 74.65
5.30 108.87
7.15 132.36
Kebutuha n Total (l/det)
106.13
156.54
284.14
Peribadatan
2.
Tahun Desain 2020 2030
52683 0.7 Tahun Desain Parameter 2010 2020 Sambungan R 29.92 45.32 Hidran Umum 1.55 2.35 TOTAL 31.47 47.66 Kebutuhan Non Domestik (l/det) Pendidikan
Standar Kebutuhan Air (L/det) Kebutuh Kapasitas an Air (L/o/h) Tahun Awal 300 1.91 50 10 0.41 500 40000 30 0.28 3
0.14 2.73
4 5
Kebocoran (20%) 21.23 Kebutuhan ra127.35
31.31 187.84
56.83 340.97
Tabel 4.21 Rekapitulasi Qmd dan Qp Tahap I II
TahunQ rata-rata (l/dt) Q md (l/dt) 2020 2030
187.84 340.97
225.41 409.16
Q p (l/dt) 281.77 511.45
656.17
Metoda Aritmatika
Proyeksi Penduduk Kota Dre (Yi-Yrata)2
S
-2550
6,499,950
2005
-2378
5,652,506
2006
-2015
4,058,210
2007
-1707
2,912,142
2008
-1403
1,967,006
802 1413 1786 2616 3436
642,402 1,995,156 3,188,010 6,840,840 11,802,660 45,558,885
513.64
R
Tahun Aritmatika Jumlah Penduduk
0.97
2009 2010 2011 2012 2013 2014
JumlahPenduduk
(Yi-Yrata)
38292 125000 38464 38309 37586
38827 39033 120000 39135 39756 115000 39439 40480 110000 41643 41203 41927 105000 42254 42650 42627 100000 43374 43457 44097 95000 44277 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
gan Metoda Logaritma Yrata-rata
40841.5
(Yi-Yrata)
(Yi-Yrata)2
-2549.5 -2377.5 -2014.5 -1706.5 -1402.5 801.5 1412.5 1785.5 2615.5 3435.5
6,499,950 5,652,506 4,058,210 2,912,142 1,967,006 642,402 1,995,156 3,188,010 6,840,840 11,802,660 45,558,885
S
R
x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
1066.15
0.88
S
R
x
0.98
2005 2006 2007 2008 2009 2010 2011 2012 2013
Logaritmatik Jumlah Penduduk 36759 38632 39728 40506 41109 41602 42019 42379 42698 42983
38292 38464 38827 39135 39439 41643 42254 42627 43457 44277
engan Metoda Eksponensial Yi rata-rata (Yi -Yrata)
40841.5
-2549.50 -2377.50 -2014.50 -1706.50 -1402.50 801.50 1412.50 1785.50 2615.50
(Yi -Yrata)2 6,499,950.25 5,652,506.25 4,058,210.25 2,912,142.25 1,967,006.25 642,402.25 1,995,156.25 3,188,010.25 6,840,840.25
490.26
Eksponensial Jumlah Penduduk 37672 38342 39025 39720 40428 41148 41880 42626 43385
38292 38464 38827 39135 39439 41643 42254 42627 43457
3435.50
11,802,660.25 45,558,884.50
2014
dengan Metoda Geometri (Yi - Y')2 1,928,004 29,954 742,482 1,734,778 2,609,437 8,080 75,344 75,399 597,405 1,674,517 9,475,400
Yrata-rata
40841.5
Yi-Yrata
(Yi-Yrata)2
-2549.50 -2378 -2015 -1707 -1403 802 1413 1786 2616 3436 0
6,499,950 5,652,506 4,058,210 2,912,142 1,967,006 642,402 1,995,156 3,188,010 6,840,840 11,802,660 45,558,885
S
R
1025.98
0.89
44158
44277
x
Geometri
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
36903 38637 39689 40452 41054 41553 41980 42352 42684 42983
Tabel 4.7 Hasil Proyeksi Penduduk dengan Metode Terpilih Penduduk
Eksponensial
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
38292 38464 38827 39135 39439 41643 42254 42627 43457 44277
38292 38464 38827 39135 39439 41643 42254 42627 43457 44277 44945 45745 46560 47389 48233 49092 49966 50856 51762 52683
180000 Jumlah Penduduk
Tahun
170000
160000
150000
140000
130000
120000
110000
100000 2000 2005 2010 2015 2020 2025 2030 2035 Tahun
120000
110000
53622 54577 55549 56538 57545 58570 59613 60674 61755 62855 63974
100000 2000 2005 2010 2015 2020 2025 2030 2035 Tahun
REKAPITULASI PROYEKSI PE 190000
Penduduk
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
170000
f(x) = 2718.719893212x - 53543 R² = 0.9935089654
150000
130000
No
Tahun 1 2
2003 2004
3
2005
4
2006
5 6
2007 2008
7 8 9 10
2009 2010 2011 2012
11
2013
12
2014
13
2015
14
2016
15
2017
16
2018
Penduduk 43,423 43,523
110000
43,623 43,823
90000
43,923 44,123 44,723 44,923 45,123 45,323 45,520 45,756 45,992 46,230 46,469 46,722
Tahun
17
2019
46,959 47,196
18
2020
19
2021
20
2022
21
2023
22
2024
23
2025
24
2026
25
2027
230.92
47,433 47,670 47,913 48,153 48,392 48,632 48,872
X=
5
Y=
1
Z=
2
1
Kebutuhan Air (L/det) Tahap I
Tahap II
0.69 9.72
0.81 11.11
11.57 18.52
13.89 22.22
20.83 61.34
25.00 73.03
Kebutuhan Air (L/det) Tahap I 2.08 0.46 0.65
Tahap II 2.31 0.51 0.74
175.74
3.19
3.56
9.55
Kebutuhan Air (L/det) Tahap I
Tahap II
22.57
27.78
4.38 1.40 0.51 28.85
5.02 1.82 0.59 35.21
85.25
Kebutuhan Air (L/det) Tahap I
Tahap II
0.65 0.53 0.39 1.57
0.81 0.57 0.47 1.85
Kebutuhan Air (L/det)
4.49
Tahap I
Tahap II
2.31
2.89
2.08 1.22 5.61
2.57 1.49 6.96
16.26
Kebutuhan Air (L/det) Tahap I
Tahap II
3.47 0.58
4.51 0.69
0.83
1.25
0.42 5.30
0.69 7.15
15.19
Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Aritmatika
125000 120000 115000 110000 Column Q
105000
Column R
100000 95000
JumlahPendudukk
90000 2004 2006 2008 2010 2012 2014 2016 Tahun
0 -1142.277 -2431.399 -3279.572 -3632.882 2573.1372 5348.5249 7720.6397 12627.1 18214.671 35997.943
Proyeksi Penduduk KotaDream Island Tahap II dengan Metode Logaritma 125000 120000 115000 110000 105000
Column Q Column R
100000 95000 90000 2004200620082010201220142016 Tahun
Jum lahPenduduk
Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Eksponensial 125000 120000 115000 110000 105000 100000 95000 90000 2004 2006 2008 2010 2012 2014 2016
Column Q Column R
115000 110000 Column Q
105000
Column R
100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
Jumlah Penduduk
JumlahPenduduk
38292 38464 38827 39135 39439 41643 42254 42627 43457 44277
Proyeksi Penduduk Kota Drea Island Tahap II dengan Metode Geometri 125000 120000 115000 110000 Column R
105000 100000 95000 90000 2004200620082010201220142016 Tahun
15 2020 2025 2030 2035 2040 Tahun
Column S
15 2020 2025 2030 2035 2040 Tahun
REKAPITULASI PROYEKSI PENDUDUK TAHUN 2005-2035
00
00
f(x) = 2718.719893212x - 5354363.87055883 R² = 0.9935089654
00
Penduduk
00
Linear (Penduduk)
00
00
Tahun
3549
Tabel 4.6 Perbandingan Metode Proyeksi Penduduk Metode Aritmatik
S 513.64
R 0.97
Logaritma 1066.15
0.88
Eksponensial 490.26
0.98
Geometri
1025.98
0.89
Tabel 4.1 Proyeksi Penduduk dengan Metoda Aritmatika NO Xi
Tahun Pendd (Yi)Yrata-rata
1
2005
2
2006
3
2007
4
2008
5
2009
6 7 8 9 10 55 a = b = Y' =
2010 2011 2012 2013 2014
22593 22852 23411 23893 24359 24565.2 24665 25253 25446 26342 26838 245,652
Xi 2
Xi.Yi
Y'
(Yi - Y')
(Yi -Y' )2
1
22,593
22,460
133
17728
4
45,704
22,928
-76
5732
9
70,233
23,396
15
238
16
95,572
23,863
30
875
25
121,795
24,331
28
769
36 49 64 81 100 385
147,990 176,771 203,568 237,078 268,380 1,389,684
24,799 25,267 25,735 26,203 26,671 245,652
-134 -14 -289 139 167 0
17990 195 83426 19407 28041 174402
21992.00 467.85 45258.87 + 245.88.X
Tabel 4.2 Proyeksi Penduduk dengan Metoda Logaritma NO. Xi 1 2 3 4 5 6 7 8 9 10 55 a = b = Y' =
Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342 26,838 245,652
ln Xi
ln Xi2
Yi ln Xi
Y'
(Yi-Y')
(Yi-Y')2
0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10
0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65
0.00 15,839.80 25,719.61 33,122.73 39,204.30 44,193.75 49,140.07 52,913.47 57,879.29 61,796.78 379,809.80
21,827 23,084 23,819 24,340 24,745 25,075 25,355 25,597 25,810 26,001 245,652
766 -232 -408 -447 -386 -410 -102 -151 532 837 0.00
586804 53617 166144 199932 148740 168258 10332 22717 282760 700146 2339452
21826.969 1812.8685 45156.48+ (963.11 x ln Xi)
Tabel 4.3 Proyeksi Penduduk dengan Metoda Eksponensial NO Xi 1 2 3 4 5 6 7 8 9
Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013
22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342
Xi2
ln Yi
Xi ln Yi
Y'
(Yi -Y' )
(Yi -Y' )2
1 4 9 16 25 36 49 64 81
10.03 10.04 10.06 10.08 10.10 10.11 10.14 10.14 10.18
10.03 20.07 30.18 40.33 50.50 60.68 70.96 81.15 91.61
22,515 22,948 23,389 23,838 24,296 24,763 25,238 25,723 26,217
78 -96 22 55 63 -98 15 -277 125
6044 9178 499 3026 3975 9548 212 76897 15504
10 55 ln a = b = Y' =
2014
26,838 245,652
100 385
10.20 101.08
101.98 557.49
26,721 245,649
117 3
13652 138536
10.003 0.019 10.720.e^0.005.X
Tabel 4.4 Proyeksi Penduduk dengan Metoda Geometri NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a= b = Y' =
Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342 26,838 245,652
ln Xi
ln Xi2
ln Yi
ln Xi ln Yi
Y'
(Yi - Y' )
0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10
0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65
10.03 10.04 10.06 10.08 10.10 10.11 10.14 10.14 10.18 10.20 101.08
0.00 6.96 11.05 13.98 16.26 18.12 19.73 21.09 22.37 23.48 153.03
21,925 23,084 23,789 24,303 24,709 25,046 25,335 25,587 25,812 26,015 245,605
668 -232 -378 -410 -350 -381 -82 -141 530 823 47
9.995 0.074 EXP(10.718+ (0.021 x ln X))
Tabel 4.5 Proyeksi Jumlah Penduduk Tahun 2013- 2027 No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Proyeksi Penduduk Tahun AritmatikaLogaritmaEksponensialGeometrik 2005 22,593 22,593 22,593 22,593 2006 22,852 22,852 22,852 22,852 2007 23,411 23,411 23,411 23,411 2008 23,893 23,893 23,893 23,893 2009 24,359 24,359 24,359 24,359 2010 24,665 24,665 24,665 24,665 2011 25,253 25,253 25,253 25,253 2012 25,446 25,446 25,446 25,446 2013 26,342 26,342 26,342 26,342 2014 26,838 26,838 26,838 26,838 2015 27,138 26,174 27,235 26,199 2016 27,606 26,332 27,758 26,369 2017 28,074 26,477 28,291 26,527 2018 28,542 26,611 28,834 26,673 2019 29,010 26,736 29,388 26,810 2020 29,478 26,853 29,953 26,939 2021 29,946 26,963 30,528 27,060 2022 30,413 27,067 31,115 27,176 2023 30,881 27,165 31,713 27,285 2024 31,349 27,258 32,322 27,389
Tabel 4.7 Hasil Proyeksi
Penduduk
No
22,593 22,852 23,411 23,893 24,359 24,665 25,253 25,446 26,342 26,838
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25 26 27 28 29 30 31 32
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036
31,817 32,285 32,753 33,221 33,688 34,156 34,624 35,092 35,560 36,028 36,495 36,963
27,346 27,431 27,511 27,588 27,662 27,733 27,802 27,868 27,931 27,993 28,052 28,110
32,943 33,576 34,221 34,878 35,548 36,231 36,927 37,637 38,360 39,097 39,848 40,613
27,489 27,584 27,675 27,763 27,847 27,928 28,006 28,082 28,156 28,226 28,295 28,362
21 22 23 24 25 26 27 28 29 30 31
Tabel 4.9 Rekapitulasi Peningkatan Jumlah Pend No. Tahapan Proyek Jumlah Penduduk Persen Pelayanan Jumlah yang terlayani 1 2010 26838 0.55 14761 2 2020 32322 0.7 22625 3 2030 39097 0.8 31277
Tabel 4.8 Standar Pemakaian Air Kota 1001 Malam Standar Kebutuhan No
Jenis Fasilitas
Air Tahap I Tahap II
Kapasitas
Keterangan
Rumah Tangga 1
2
3
Sambunga n rumah
130
130
L/jiwa/hari
- Hidran umum Sekolah - TK - SD - SMP - SMU
30
30
L/jiwa/hari
20* 40 50 80
20* 40 50 80
L/jiwa/hari L/jiwa/hari L/jiwa/hari L/jiwa/hari
PT/Akade mi
80
80
L/jiwa/hari
Peribadata n
10
10
L/jiwa/hari
- Rumah Sakit
500
500
L/tt/hari
Puskesma s
350
350
- Klinik
350
350
L/tt/hari L/tt/hari
Kesehatan
4
*data asumsi
4
- Apotek
350
350
L/h/unit *data DPU tahun 2010
Industri* Industri Besar
5
Karyawan Pria
60
60
L/o/h
Karyawan wanita
100
100
L/o/h
Karyawan Pria
60
60
L/o/h
Karyawan wanita
100
100
L/o/h
- Pasar - Toko
5 3
5 3
L/m2/h L/o/h
- Restoran Perkantor an Besar
15
15
L/o/h
100
100
L/jiwa/hari
Menengah Kecil Lain-lain - Hotel
100 100
100 100
L/jiwa/hari L/jiwa/hari
300
300
L/tt/h
- Bioskop
10
10
L/td/h
-Stadion Olahraga*
30
30
L/o/h
- Terminal bus
3
3
L/o/h
Industri Kecil
Perdagang an 6
7
8
*data asumsi
Data standarpemakaian air
Tabel 4.11 Rekapitulasi Kebutuhan Air Domestik Kota 1001 Malam Tahun Tahun Awal (2010) Jenis Sambungan SR HU Sambungan (%) 0.82 0.18 Jumlah Penduduk Yang Terlayani (Jiwa) 14761 Jumlah Pengguna 12055 2706 Standar(Jiwa) Kebutuhan Air (L/o/h) 130 30 Kebutuhan Air (L/det) 18.14 0.94 Total 19.08
Tahap I (2020) SR HU 0.82 0.18 22625 18477 4148 130 30 27.80 1.44 29.24
Tahap II (2030) SR HU 0.85 5.01 31277 26586 156700 130 30 40.00 54.41 94.41
Tabel 4.10 Jenis Pemukiman Penduduk Kota 100 No.
Jenis Rumah
1 2 3
Permanen Semi Perm Non perma
2010 65 25 10
Persen Jenis 2020 55 40 5
2030 65 30 5
Tabel 4.12 Rekapitulasi Penambahan Fasilitas Perkotaan Kot Jumlah No.
1
Jenis Kapasitas Fasilitas Sekolah a. TK b. SD c. SMP d. SMU e. PT/A kade mi
Data Awal (2009)
*Tahap I (2019)
*Tahap II (2029)
23
30
35
30
35
40
24
25
30
12
25
30
9
15
18
SOAL 100 jiwa/unit 600 jiwa/unit 800 jiwa/unit 800 jiwa/unit 1500 jiwa/unit
18 25 19 7
4
Peribadata n - Mesjid 2
400 jiwa/unit 100 jiwa/unit
41
45
50
37
40
44
400 jiwa/unit
10
14
16
- Rumah 300 tt/unit Sakit 40 tt/unit Puskesma s
10
13
16
17
27
31
- Klinik - Apotik Industri - Industri Besar
15 tt/unit 5 tt/unit
13 14
23 25
30 29
2 Ha/Unit
9
15
23
Mushalla
36
32 - Gereja
5
Kesehatan
3
4
5
12 8 9
4
4 - Industri Kecil
200 m2/Unit
17
- Pasar
700 m2/unit
8
- Toko
50 m /unit
255
23
30
16
20
12
Perdagang an
5
2
3 305
330 250
50 m /unit Restauran 2
31
45
54 26
Perkantor an
6
- Kantor besar
1000 m2/unit
13
20
25
- Kantor Menengah
600 m2/unit
19
30
37
- Kantor kecil
300 m2/unit
25
35
43
50 tt/Unit
11
20
26
500 td/Unit 4 Ha
7
10
12
2
6
9
6
10
8
14 20
Lain-Lain - Hotel - Bioskop 7
- Stadion Olahraga - Terminal 200 unit bus bus/Hari
6 2 1
2 1
Tabel 4.13 Rekapitulasi Kebutuhan Air Untuk Sarana Pendidikan No. 1 2 3 4 5
Jumlah (unit)
Sarana Pendidik an TK SD
Tahun Awal 23 30
SMP/MT SN SMU
24 12
PT/Akade mi
9
Tahap I
Tahap II
Kapasitas (jiwa/unit)
30 35 25
35 40 30
100 600 800
25 15
30 18
800 1500
Standar Kebutuhan Air (L/o/h) 20 40
Kebutuhan Air (L Tahun Awal 0.53 8.33
50 80
11.11 8.89
80
12.50 41.37
Kebutuhan Total
Tabel 4.14 Rekapitulasi Kebutuhan Air Untuk Sarana Peribadatan No.
Sarana Peribadat an
Jumlah (unit)
Kapasitas (jiwa/unit)
Standar Kebutuhan Air (L/o/h)
Kebutuhan Air (L
No. 1 2 3
Sarana Peribadat an Mesjid Mushalla Gereja
Tahun Awal 41 37 10
Standar Kebutuhan Air (L/o/h)
Tahap I
Tahap II
Kapasitas (jiwa/unit)
45 40
50 44
400 100
10 10
1.90 0.43
400
10
0.46 2.79
14 16 Kebutuhan Total
Tahun Awal
Tabel 4.15 Rekapitulasi Kebutuhan Air untuk Sarana Kesehatan No.
Sarana Kesehata n
Jumlah (unit) Tahun Awal
1
Rumah sakit
10
2 3 4
Puskesma s Klinik Apotek
17 13 14
Tahap I
Tahap II
Kapasitas (tt/unit)
13
16
300
27
31
23 30 25 29 Kebutuhan Total
Standar Kebutuhan Air (L/tt/h)
Kebutuhan Air (L Tahun Awal
500
17.36
350 350 350
2.75 0.79 0.28 21.19
40 15 5
Tabel 4.16 Rekapitulasi Kebutuhan Air untuk Sarana Perindus Kriteria 2010 2020 Jumlah (unit) 2030 Kapasitas (m2/unit) P 2010 W Jumlah P 2020 Karyawa W n P 2030 W P Standar Kebutuhan Air (l/jiwa/hr) W P 2010 W Kebutuh P 2020 an Air W (l/dtk) P 2030 W
Industri Industri Kecil Besar 9 17 15 23 23 30 20000 200 720 27 1080 41 1200 37 1800 55 1840 48 2760 72 60 60 100 100 0.50 0.02 1.25 0.05 0.83 0.03 2.08 0.06 1.28 0.03 3.19 0.08
Kebutuhan Total 1.82 3.01 4.59 9.41
Tabel 4.17 Rekapitulasi Kebutuhan Air untuk Sarana Perdagangan No. 1 2
Sarana Perdagan gan Pasar Toko
Jumlah (unit) Tahun Awal
Tahap I
Tahap II
Kapasitas (m2/unit)
8 255
16 305
20 330
700 50
Standar Kebutuhan Air (L/m2/h) 5 3
Kebutuhan Air (L Tahun Awal 0.32 0.44
3
Restoran
35
45 54 Kebutuhan Total
15
50
0.30 1.07
Tabel 4.18 Rekapitulasi Kebutuhan Air untuk Sarana Perkantoran
1
Sarana Perkanto ran Besar
2 3
Menengah Kecil
No.
Jumlah (unit) Tahun Awal
Tahap I
Tahap II
Kapasitas (m2/unit)
13 19
20 30
25 37
1000 600
25
35 43 Kebutuhan Total
300
Standar Kebutuhan Air (L/o/h) 100 100 100
Kebutuhan Air (L Tahun Awal 1.50 1.32 0.87 3.69
Tabel 4.19 Rekapitulasi Kebutuhan Air untuk Sarana Lain-lain No. 1 2
Sarana fasilitas
3
Hotel Bioskop Stadion Olahraga
4
Terminal Bus
Jumlah (unit) Tahun Awal 11 7 2
Kapasitas Tahap I
Tahap II
20 10 6
26 12 9
1.
6 10 Kebutuhan Total
2.
Tahun Desain Paramete r 2010 2020 Kebutuhan Domestik Jumlah pen 26838 32322 % Pelayana 0.55 0.7 Tahun Desain Parameter 2010 2020 Sambungan 18.14 27.80 Hidran Umu 0.94 1.44 TOTAL 19.08 29.24 Kebutuhan Non Domestik (l/det) Pendidika n 41.37 61.34 Peribadata 2.79 3.19 n Kesehatan Industri Perdagang an Perkantor an
Tahun Awal
300 10
1.91 0.41
30
0.28
3
0.14 2.73
200 2
Tabel 4.20 Rekapitulasi Kebutuhan Air Kota 1 No.
50 500 40000
Kebutuhan Air (L
Standar Kebutuhan Air (L/o/h)
2030 39097 0.8 2030 40.00 54.41 94.41
73.03 3.56
21.19 1.82
28.85 3.01
35.21 4.59
1.07
1.57
1.85
3.69
5.61
6.96
2.
3
4 5
Sarana lainnya TOTAL
2.73 74.65
5.30 108.87
7.15 132.36
Kebutuh an Total (l/det)
93.73
138.12
226.77
Kebocora n (20%) 18.75 Kebutuhan 112.48
27.62 165.74
45.35 272.12
Tabel 4.21 Rekapitulasi Qmd dan Qp Tahap I II
TahunQ rata-rata (l/dt) Q md (l/dt) 2020 2030
165.74 272.12
198.89 326.55
Q p (l/dt) 248.61 408.18
550.34
a Aritmatika
Proyeksi P (Yi-Yrata)2
S
-1972
3,889,573
2005
22460
22593
-1713
2,935,054
2006
22928
22852
-1154
1,332,178
2007
23396
23411
-672
451,853
2008
23863
23893
-206
42,518
2009
24331
24359
100 688 881 1777 2273
9,960 473,069 775,809 3,157,018 5,165,620 18,232,652
2010 2011 2012 2013 2014
24799 25267 25735 26203 26671
24665
139.20
R
Tahun Aritmatika Jumlah Penduduk
1.00
JumlahPenduduk
(Yi-Yrata)
125000 120000 115000 110000 105000
25253 25446 26342 26838
100000 95000
90000 2004 2006 2008
Yrata-rata
24565.2
(Yi-Yrata) (Yi-Yrata)2 -1972.2 -1713.2 -1154.2 -672.2 -206.2 99.8 687.8 880.8 1776.8 2272.8
3,889,573 2,935,054 1,332,178 451,853 42,518 9,960 473,069 775,809 3,157,018 5,165,620 ###
S
509.84
R
0.93
x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Logaritmatik Jumlah Penduduk 21827 23084 23819 24340 24745 25075 25355 25597 25810 26001
22593 22852 23411 23893 24359 24665 25253 25446 26342 26838
JumlahPendudukk
etoda Logaritma 0 -823.1121 -1393.06 -1291.842 -534.1179 320.39812 2604.4003 3808.6471 8578.0277 12050.154 23319.495
Proyeksi P 125000 120000 115000 110000 105000 100000 95000
90000 20042006200
Metoda Eksponensial
24565.2
(Yi -Yrata) (Yi -Yrata)2 -1972.20 -1713.20 -1154.20 -672.20 -206.20 99.80 687.80 880.80 1776.80
### ### ### ### 42,518.44 9,960.04 ### ### ###
S
124.07
R
x
1.00
2005 2006 2007 2008 2009 2010 2011 2012 2013
Proyeksi P
Eksponensial Jumlah Penduduk 22515 22948 23389 23838 24296 24763 25238 25723 26217
22593 22852 23411 23893 24359 24665 25253 25446 26342
Jum lahPenduduk
Yi rata-rata
125000 120000 115000 110000 105000 100000 95000
90000 2004 2006 200
115000 110000 105000
2272.80
### ###
2014
26721
100000
26838
95000
90000 2004 2006 200
an Metoda Geometri (Yi - Y')2 445,980 53,609 143,106 168,170 122,670 145,261 6,650 19,900 281,011 677,850 2,064,209
x Yrata-rata
24565.2
Yi-Yrata (Yi-Yrata)2 -1972.20 -1713 -1154 -672 -206 100 688 881 1777 2273 0
3,889,573 2,935,054 1,332,178 451,853 42,518 9,960 473,069 775,809 3,157,018 5,165,620 ###
S
R
478.89
0.94
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Geometri Jumlah Penduduk 21925 23084 23789 24303 24709 25046 25335 25587 25812 26015
22593 22852 23411 23893 24359 24665 25253 25446 26342 26838
abel 4.7 Hasil Proyeksi Penduduk dengan Metode Terpilih 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
180000
Penduduk Eksponensial 22593 22852 23411 23893 24359 24665 25253 25446 26342 26838
22593 22852 23411 23893 24359 24665 25253 25446 26342 26838 27235 27758 28291 28834 29388 29953 30528 31115 31713 32322
Jumlah Penduduk
Tahun
170000
160000
150000
140000
130000
120000
110000
100000 2000 2005 2010 2015 2020 2025 2030 2035 2040 Tahun
120000
110000
32943 33576 34221 34878 35548 36231 36927 37637 38360 39097 39848
100000 2000 2005 2010 2015 2020 2025 2030 2035 2040 Tahun
REKAPITULASI PROYEKSI PENDU 190000
Penduduk
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
170000
f(x) = 2718.719893212x - 5354363.870 R² = 0.9935089654
150000
P
No
Tahun 1 2
2003 2004
3
2005
Penduduk
130000
L
43,423 43,523 43,623
110000
43,823 4
2006
5 6 7 8 9 10
2007 2008 2009 2010 2011 2012
11
2013
12
2014
13
2015
14
2016
15
2017
16
2018
90000 43,923 44,123 44,723 44,923 45,123 45,323
Tahun
45,520 45,756 45,992 46,230 46,469 46,722
3549
17
2019
18
2020
19
2021
20
2022
21
2023
22
2024
23
2025
24
2026
25
2027
142.73
46,959 47,196 47,433 47,670 47,913 48,153 48,392 48,632 48,872
X=
5
Y=
1
Z=
2
1
Kebutuhan Air (L/det) Tahap I
Tahap II
0.69 9.72
0.81 11.11
11.57 18.52
13.89 22.22
20.83 61.34
25.00 73.03
Kebutuhan Air (L/det)
175.74
Tahap I
Tahap II
2.08 0.46
2.31 0.51
0.65 3.19
0.74 3.56
9.55
Kebutuhan Air (L/det) Tahap I
Tahap II
22.57
27.78
4.38 1.40 0.51 28.85
5.02 1.82 0.59 35.21
Kebutuhan Air (L/det) Tahap I
Tahap II
0.65 0.53
0.81 0.57
85.25
0.39 1.57
0.47 1.85
4.49
Kebutuhan Air (L/det) Tahap I
Tahap II
2.31
2.89
2.08 1.22 5.61
2.57 1.49 6.96
16.26
Kebutuhan Air (L/det) Tahap I
Tahap II
3.47 0.58
4.51 0.69
0.83
1.25
0.42 5.30
0.69 7.15
15.19
JumlahPenduduk
Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Aritmatika
125000 120000 115000 110000 Column Q
105000
Column R
100000 95000
JumlahPendudukk
90000 2004 2006 2008 2010 2012 2014 2016 Tahun
Proyeksi Penduduk KotaDream Island Tahap II dengan Metode Logaritma 125000 120000 115000 110000 105000
Column Q Column R
100000 95000 90000 2004200620082010201220142016 Tahun
Jum lahPenduduk
Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Eksponensial 125000 120000 115000 110000 105000 100000 95000 90000 2004 2006 2008 2010 2012 2014 2016
Column Q Column R
115000 110000 Column Q
105000
Column R
100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
mlah Penduduk
JumlahPenduduk
Proyeksi Penduduk Kota Drea Island Tahap II dengan Metode Geometri 125000 120000 115000 110000 Column R
105000 100000 95000 90000 2004200620082010201220142016 Tahun
2025 2030 2035 2040
Column S
2025 2030 2035 2040
ULASI PROYEKSI PENDUDUK TAHUN 2005-2035
2718.719893212x - 5354363.87055883 0.9935089654
Penduduk Linear (Penduduk)
Tahun
Tabel 4.6 Perbandingan Metode Proyeksi Penduduk Metode Aritmatik
S 139.20
R 1.00
Logaritma
509.84
0.93
Eksponensial 124.07
1.00
Geometri
478.89
0.94
Tabel 4.1 Proyeksi Penduduk dengan Metoda Aritmatika NO Xi
Tahun Pendd (Yi)Yrata-rata
1
2005
2
2006
3
2007
4
2008
5
2009
6 7 8 9 10 55 a = b = Y' =
2010 2011 2012 2013 2014
40390 40912 42040 43017 44007 44553.5 44928 46062 46342 48461 49376 445,535
Xi 2
Xi.Yi
Y'
(Yi - Y')
(Yi -Y' )2 (Yi-Yrata)
1
40,390
40,046
344
118486
-4164
4
81,824
41,047
-135
18359
-3642
9
126,120
42,049
-9
85
-2514
16
172,068
43,051
-34
1151
-1537
25
220,035
44,053
-46
2083
-547
36 49 64 81 100 385
269,568 322,434 370,736 436,149 493,760 2,533,084
45,054 46,056 47,058 48,060 49,061 445,535
-126 6 -716 401 315 0
15966 35 512352 161200 99088 928806
375 1509 1789 3908 4823
39044.07 1001.72 45258.87 + 245.88.X
Tabel 4.2 Proyeksi Penduduk dengan Metoda Logaritma NO. Xi 1 2 3 4 5 6 7 8 9 10 55 a = b = Y' =
Tahun
40390
ln Xi
ln Xi2
Yi ln Xi
Y'
(Yi-Y')
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
40,390 40,912 42,040 43,017 44,007 44,928 46,062 46,342 48,461 49,376 445,535
0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10
0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65
0.00 28,358.04 46,185.66 59,634.22 70,826.53 80,500.17 89,632.51 96,365.48 106,479.70 113,692.44 691,674.76
38,706 41,390 42,959 44,073 44,937 45,643 46,239 46,756 47,212 47,620 445,535
1684 -478 -919 -1056 -930 -715 -177 -414 1249 1756 0.00
(Yi-Y')2 Yrata-rata 2834407 228171 845055 1114956 864390 510526 31415 171526 1559733 3083647 11243828
44553.5
38706.43 3871.1003 45156.48+ (963.11 x ln Xi)
Tabel 4.3 Proyeksi Penduduk dengan Metoda Eksponensial NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a =
Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
10.579
40,390 40,912 42,040 43,017 44,007 44,928 46,062 46,342 48,461 49,376 445,535
Xi2
ln Yi
Xi ln Yi
Y'
1 4 9 16 25 36 49 64 81 100 385
10.61 10.62 10.65 10.67 10.69 10.71 10.74 10.74 10.79 10.81 107.02
10.61 21.24 31.94 42.68 53.46 64.28 75.16 85.95 97.10 108.07 590.48
40,186 41,098 42,032 42,987 43,963 44,962 45,984 47,028 48,096 49,189 445,526
(Yi -Y' ) (Yi -Y' )2 Yi rata-rata 204 -186 8 30 44 -34 78 -686 365 187 9
41793 34764 63 906 1899 1165 6159 470758 132902 34956 725363
44553.5
b = Y' =
0.022 10.720.e^0.005.X
Tabel 4.4 Proyeksi Penduduk dengan Metoda Geometri NO Xi 1 2 3 4 5 6 7 8 9 10 55 ln a= b = Y' =
Tahun Pendd (Yi) 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
40,390 40,912 42,040 43,017 44,007 44,928 46,062 46,342 48,461 49,376 445,535
ln Xi
ln Xi2
ln Yi
ln Xi ln Yi
Y'
0.00 0.69 1.10 1.39 1.61 1.79 1.95 2.08 2.20 2.30 15.10
0.00 0.48 1.21 1.92 2.59 3.21 3.79 4.32 4.83 5.30 27.65
10.61 10.62 10.65 10.67 10.69 10.71 10.74 10.74 10.79 10.81 107.02
0.00 7.36 11.70 14.79 17.21 19.19 20.89 22.34 23.70 24.88 162.08
38,954 41,390 42,886 43,979 44,847 45,568 46,187 46,731 47,215 47,652 445,410
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
1436 -478 -846 -962 -840 -640 -125 -389 1246 1724 125
2,063,459 228,731 715,243 926,256 705,490 410,153 15,749 150,971 1,552,881 2,971,039 9,739,973
10.570 0.088 EXP(10.718+ (0.021 x ln X))
Tabel 4.5 Proyeksi Jumlah Penduduk Tahun 2013- 2027 No
(Yi - Y' ) (Yi - Y')2
Proyeksi Penduduk Tahun Penduduk AritmatikaLogaritmaEksponensialGeometrik 2005 40,390 40,390 40,390 40,390 40,390 2006 40,912 40,912 40,912 40,912 40,912 2007 42,040 42,040 42,040 42,040 42,040 2008 43,017 43,017 43,017 43,017 43,017 2009 44,007 44,007 44,007 44,007 44,007 2010 44,928 44,928 44,928 44,928 44,928 2011 46,062 46,062 46,062 46,062 46,062 2012 46,342 46,342 46,342 46,342 46,342 2013 48,461 48,461 48,461 48,461 48,461 2014 49,376 49,376 49,376 49,376 49,376 2015 50,063 47,989 50,306 48,052 2016 51,065 48,326 51,449 48,419 2017 52,066 48,636 52,618 48,759 2018 53,068 48,922 53,813 49,077 2019 54,070 49,190 55,036 49,374 2020 55,072 49,439 56,286 49,654 2021 56,073 49,674 57,565 49,918 2022 57,075 49,895 58,872 50,168 2023 58,077 50,105 60,210 50,406 2024 59,078 50,303 61,577 50,633 2025 60,080 50,492 62,976 50,850 2026 61,082 50,672 64,407 51,057 2027 62,084 50,844 65,870 51,256 2028 63,085 51,009 67,366 51,448 2029 64,087 51,167 68,897 51,632 2030 65,089 51,319 70,462 51,810 2031 66,090 51,465 72,063 51,981 2032 67,092 51,606 73,700 52,147
Tabel 4.7 Hasil Proyeksi Penduduk No
Tahun
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032
29 30 31 32
2033 2034 2035 2036
68,094 69,096 70,097 71,099
51,742 51,873 52,000 52,123
75,374 77,086 78,837 80,628
52,307 52,463 52,613 52,760
29 30 31
2033 2034 2035
Tabel 4.9 Rekapitulasi Peningkatan Jumlah P No. Tahapan Proyek Jumlah Penduduk Persen Pelayanan Jumlah yang terlayani 1 2010 49376 0.55 27157 2 2020 61577 0.7 43104 3 2030 77086 0.8 61669
Tabel 4.8 Standar Pemakaian Air Kota 1001 Malam Standar Kebutuhan No
Jenis Fasilitas
Air Keterang Tahap I Tahap II Kapasitas an
Rumah Tangga 1
2
3
Sambunga n rumah
130
130
L/jiwa/hari
4
- Hidran umum Sekolah
30
30
L/jiwa/hari
5 6
- TK
20*
20*
L/jiwa/hari
- SD
40
40
L/jiwa/hari
8
- SMP
50
50
L/jiwa/hari
9
- SMU
80
80
L/jiwa/hari
10
PT/Akade mi
80
80
L/jiwa/hari
11
Peribadata n
10
10
L/jiwa/hari
12
*data asumsi
7
13
- Rumah Sakit
500
500
L/tt/hari
14
Puskesma s
350
350
15
- Klinik
350
350
- Apotek
350
350
L/tt/hari L/tt/hari L/h/unit
Industri* Industri Besar 5
1 2 3
Kesehatan
4
No
16 17 *data DPU tahun 2010
18 19
5
Karyawan Pria
60
60
L/o/h
20
Karyawan wanita
100
100
L/o/h
21
Industri Kecil
22
Karyawan Pria
60
60
L/o/h
23
Karyawan wanita
100
100
L/o/h
24
- Pasar - Toko
5 3
5 3
L/m /h L/o/h
- Restoran Perkantor an
15
15
L/o/h
Besar
100
100
L/jiwa/hari
Menengah
100
100
L/jiwa/hari
Kecil Lain-lain - Hotel
100
100
L/jiwa/hari
300
300
L/tt/h
- Bioskop
10
10
L/td/h
-Stadion Olahraga*
30
30
L/o/h
- Terminal bus
3
3
L/o/h
Perdagang an 6
7
8
25 2
*data asumsi
Data standarpemakaian air
Tabel 4.11 Rekapitulasi Kebutuhan Air Domestik Kota 1001 Malam Tahun Tahun Awal (2010) Jenis Sambungan SR HU Sambungan (%) 0.82 0.18 Jumlah Penduduk Yang Terlayani (Jiwa) 27157 Jumlah Pengguna 22178 4979 Standar(Jiwa) Kebutuhan Air (L/o/h) 130 30 Kebutuhan Air (L/det) 33.37 1.73 Total 35.10
Tahap I (2020) SR HU 0.82 0.18 43104 35202 7902 130 30 52.97 2.74 55.71
Tabel 4.10 Jenis Pemukiman Penduduk Kota No.
Jenis Rumah
1
Permanen
2010 65
Persen Jenis 2020 55
2030 65
Tahap II (2030) SR HU 0.85 5.01 61669 52418 308961 130 30 78.87 107.28 186.15
276.96
2 3
Semi Perm Non perma
25 10
40 5
30 5
Tabel 4.12 Rekapitulasi Penambahan Fasilitas Perkot Jumlah No.
1
Jenis Kapasitas Fasilitas Sekolah a. TK b. SD c. SMP d. SMU e. PT/A kade mi
Data Awal (2009)
*Tahap I *Tahap II (2019) (2029) SOAL
100 jiwa/unit 600 jiwa/unit 800 jiwa/unit 800 jiwa/unit 1500 jiwa/unit
23
30
35
30
35
40
24
25
30
12
25
30
9
15
18
18
X=
25
Y=
19
Z=
7
4
Peribadata n - Mesjid 2
Mushalla
400 jiwa/unit 100 jiwa/unit
41
45
50
37
40
44
36
32 - Gereja
400 jiwa/unit
10
14
16
- Rumah 300 tt/unit Sakit 40 tt/unit Puskesma s
10
13
16
17
27
31
- Klinik - Apotik Industri - Industri Besar - Industri Kecil
15 tt/unit 5 tt/unit
13 14
23 25
30 29
2 Ha/Unit
9
15
23
200 m2/Unit
17 23
30
- Pasar
700 m2/unit
8
16
20
- Toko
50 m /unit
255
5
Kesehatan
3
4
5
12 8 9
4 12
Perdagang an
5
2
3 305
330 250
5 50 m2/unit Restauran
31
45
54 26
Perkantor an
6
- Kantor besar
1000 m2/unit
13
- Kantor Menengah
600 m2/unit
19
20
25 8
30
37 14
- Kantor kecil
300 m2/unit
25
35
43
50 tt/Unit
11
20
26
500 td/Unit 4 Ha
7
10
12
2
6
9
6
10
20
Lain-Lain - Hotel - Bioskop 7
- Stadion Olahraga - Terminal 200 unit bus bus/Hari
6 2 1
2 1
Tabel 4.13 Rekapitulasi Kebutuhan Air Untuk Sarana Pendidikan No. 1 2 3 4 5
Standar Kapasitas Kebutuh (jiwa/unit an Air Tahap II ) (L/o/h) 20 35 100 40 40 600
Jumlah (unit)
Sarana Pendidik an TK SD
Tahun Awal 23 30
SMP/MT SN SMU
24 12
PT/Akade mi
9
Tahap I 30 35 25 25 15
30
800
30 18
800 1500
Kebutuhan Air (L/det) Tahun Tahap I Awal 0.53 0.69 8.33 9.72
50 80
11.11 8.89
11.57 18.52
80
12.50 41.37
20.83 61.34
Kebutuhan Total
Tabel 4.14 Rekapitulasi Kebutuhan Air Untuk Sarana Peribadatan No. 1 2 3
Sarana Peribadat an Mesjid Mushalla Gereja
Standar Kapasitas Kebutuh (jiwa/unit an Air Tahap II ) (L/o/h) 50 400 10 44 100 10
Jumlah (unit) Tahun Awal 41 37 10
Tahap I 45 40
14 16 Kebutuhan Total
400
10
Kebutuhan Air (L/det) Tahun Tahap I Awal 1.90 2.08 0.43 0.46 0.46 2.79
0.65 3.19
Tabel 4.15 Rekapitulasi Kebutuhan Air untuk Sarana Kesehatan No.
Sarana Kesehata n
Standar Kapasitas Kebutuh an Air Tahap II (tt/unit) (L/tt/h)
Jumlah (unit) Tahun Awal
Tahap I
Kebutuhan Air (L/det) Tahun Tahap I Awal
1
Rumah sakit
2 3 4
Puskesma s Klinik Apotek
13
16
300
27
31
40
10 17 13 14
23 30 25 29 Kebutuhan Total
15 5
500
17.36
22.57
350 350 350
2.75 0.79 0.28 21.19
4.38 1.40 0.51 28.85
Tabel 4.16 Rekapitulasi Kebutuhan Air untuk Sarana P Kriteria 2010 2020 Jumlah (unit) 2030 Kapasitas (m2/unit) P 2010 W Jumlah P 2020 Karyawa W n P 2030 W P Standar Kebutuhan Air (l/jiwa/hr) W P 2010 W Kebutuh P 2020 an Air W (l/dtk) P 2030 W
Industri Besar 9 15 23 20000 720 1080 1200 1800 1840 2760 60 100 0.50 1.25 0.83 2.08 1.28 3.19
Industri Kecil 17 23 30 200 27 41 37 55 48 72 60 100 0.02 0.05 0.03 0.06 0.03 0.08
Kebutuh an Total 1.82 3.01 4.59 9.41
Tabel 4.17 Rekapitulasi Kebutuhan Air untuk Sarana Perdagangan No. 1 2 3
Sarana Perdagan gan Pasar Toko Restoran
Standar Kapasitas Kebutuh Tahun Tahap I Tahap II (m2/unit) an Air Awal (L/m2/h) 5 8 16 20 700 3 255 305 330 50 15 35 45 54 50 Kebutuhan Total Jumlah (unit)
Kebutuhan Air (L/det) Tahun Tahap I Awal 0.32 0.65 0.44 0.53 0.30 0.39 1.07 1.57
Tabel 4.18 Rekapitulasi Kebutuhan Air untuk Sarana Perkantoran
1
Sarana Perkanto ran Besar
2 3
Menengah Kecil
No.
Standar Kapasitas Kebutuh Tahun Tahap I Tahap II (m2/unit) an Air Awal (L/o/h) 100 13 20 25 1000 19 30 37 600 100 100 25 35 43 300 Kebutuhan Total Jumlah (unit)
Kebutuhan Air (L/det) Tahun Tahap I Awal 1.50 2.31 1.32 0.87 3.69
2.08 1.22 5.61
Tabel 4.19 Rekapitulasi Kebutuhan Air untuk Sarana Lain-lain No.
Sarana fasilitas
Jumlah (unit)
Standar Kebutuh Kapasitas an Air (L/o/h)
Kebutuhan Air (L/det)
No. 1 2
Sarana fasilitas
3
Hotel Bioskop Stadion Olahraga
4
Terminal Bus
Standar Kebutuh Kapasitas an Air Tahap II (L/o/h) 300 26 50 10 12 500 9 40000 30
Jumlah (unit) Tahun Awal 11 7 2
Tahap I 20 10 6
1.
6 10 Kebutuhan Total
2.
3
4 5
Tahun Desain Paramete r 2010 2020 Kebutuhan Domestik Jumlah pen 49376 61577 % Pelayana 0.55 0.7 Tahun Desain Parameter 2010 2020 Sambungan 33.37 52.97 Hidran Umu 1.73 2.74 TOTAL 35.10 55.71 Kebutuhan Non Domestik (l/det) Pendidika n 41.37 61.34 Peribadata 2.79 3.19 n Kesehatan Industri Perdagang an Perkantor an Sarana lainnya TOTAL
3
2030 77086 0.8 2030 78.87 107.28 186.15
73.03 3.56
21.19 1.82
28.85 3.01
35.21 4.59
1.07
1.57
1.85
3.69
5.61
6.96
2.73 74.65
5.30 108.87
7.15 132.36
109.75
164.58
318.51
Kebocora n (20%) 21.95 Kebutuhan 131.70
32.92 197.50
63.70 382.21
Kebutuh an Total (l/det)
Tabel 4.21 Rekapitulasi Qmd dan Qp Tahap I II
TahunQ rata-rata (l/dt) Q md (l/dt) Q p (l/dt) 2020 2030
Tahun Awal 1.91 0.41
Tahap I 3.47 0.58
0.28
0.83
0.14 2.73
0.42 5.30
200 2
Tabel 4.20 Rekapitulasi Kebutuhan Air Kot No.
Kebutuhan Air (L/det)
197.50 382.21
237.00 458.65
296.25 573.31
711.41
tmatika (Yi-Yrata)2
S
R
Tahun Aritmatika Jumlah Penduduk
17,334,732
2005
40046
40390
13,260,522
2006
41047
40912
6,317,682
2007
42049
42040
2,360,832
2008
43051
43017
2009
44053
44007
2010 2011 2012 2013 2014
45054 46056 47058 48060 49061
44928
298,662
321.25
0.99
140,250 2,275,572 3,198,732 15,268,556 23,256,506 83,712,049
JumlahPenduduk
Proyeksi Penduduk Kota D
120000 115000 110000 105000
46062 46342 48461 49376
100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
a Logaritma ### ### 6,317,682 2,360,832 298,662 140,250 2,275,572 3,198,732 ### ### ###
S
1117.73
R
0.93
x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Logaritmatik Jumlah Penduduk 38706 41390 42959 44073 44937 45643 46239 46756 47212 47620
40390 40912 42040 43017 44007 44928 46062 46342 48461 49376
Proyeksi Penduduk Kota JumlahPendudukk
(Yi-Yrata) (Yi-Yrata)2 -4163.5 -3641.5 -2513.5 -1536.5 -546.5 374.5 1508.5 1788.5 3907.5 4822.5
125000
0 -1749.57 -3033.666 -2952.864 -1415.594 1202.2955 5712.0353 7733.6119 18864.612 25568.404 49929.265
125000 120000 115000 110000 105000 100000 95000
90000 2004200620082010201220142016 Tahun
oda Eksponensial -4163.50 -3641.50 -2513.50 -1536.50 -546.50 374.50 1508.50 1788.50 3907.50 4822.50
### ### ### ### ### ### ### ### ### ### ###
S
283.89
R
1.00
x 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Proyeksi Penduduk Kota
Eksponensial Jumlah Penduduk 40186 41098 42032 42987 43963 44962 45984 47028 48096 49189
40390 40912 42040 43017 44007 44928 46062 46342 48461 49376
Jum lahPenduduk
(Yi -Yrata) (Yi -Yrata)2
125000 120000 115000 110000 105000 100000 95000
90000 2004 2006 2008 2010 2012 2014 20 Tahun
100000 95000
90000 2004 2006 2008 2010 2012 2014 20 Tahun
x
Yrata-rata Yi-Yrata (Yi-Yrata)2
44553.5
-4163.50 -3642 -2514 -1537 -547 375 1509 1789 3908 4823 0
### ### 6,317,682 2,360,832 298,662 140,250 2,275,572 3,198,732 ### ### ###
S
R
1040.21
0.94
Geometri Jumlah Penduduk
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
38954 41390 42886 43979 44847 45568 46187 46731 47215 47652
40390 40912 42040 43017 44007 44928 46062 46342 48461 49376
Proyeksi Pend JumlahPenduduk
etoda Geometri
125000 120000 115000 110000 105000 100000 95000
90000 200420062008201 Tahu
Hasil Proyeksi Penduduk dengan Metode Terpilih 180000
40390 40912 42040 43017 44007 44928 46062 46342 48461 49376
40390 40912 42040 43017 44007 44928 46062 46342 48461 49376 50306 51449 52618 53813 55036 56286 57565 58872 60210 61577 62976 64407 65870 67366 68897 70462 72063 73700
Jumlah Penduduk
Penduduk Eksponensial
170000
160000
150000
140000
130000
120000
110000
100000 2000 2005 2010 2015 2020 2025 2030 2035 2040 Tahun
REKAPITULASI PROYEKSI PENDUDUK TAHU 190000
REKAPITULASI PROYEKSI PENDUDUK TAHU 75374 77086 78837
Penduduk
190000
170000
f(x) = 2718.719893212x - 5354363.87055883 R² = 0.9935089654
150000
Penduduk
Tahun 2003 2004 2005
Penduduk
130000
Linear (Penduduk)
43,423 43,523 43,623
110000
43,823 90000
2006 2007 2008 2009 2010 2011 2012
43,923 44,123
Tahun
44,723 44,923 45,123 45,323 45,520
2013 2014 2015 2016
45,756 45,992 46,230 46,469
2017 2018
46,722
2019
46,959 47,196
2020 2021
47,433
3549
2022 2023 2024 2025 2026 2027
47,670 47,913 48,153 48,392 48,632 48,872
5 1 2
1
butuhan Air (L/det) Tahap II 0.81 11.11 13.89 22.22 25.00 73.03
175.74
butuhan Air (L/det) Tahap II 2.31 0.51 0.74 3.56
butuhan Air (L/det) Tahap II
9.55
27.78 5.02 1.82 0.59 35.21
85.25
butuhan Air (L/det) Tahap II 0.81 0.57 0.47 1.85
4.49
butuhan Air (L/det) Tahap II 2.89 2.57 1.49 6.96
butuhan Air (L/det)
16.26
butuhan Air (L/det) Tahap II 4.51 0.69 1.25 0.69 7.15
15.19
Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Aritmatika 125000 120000 115000 110000 105000
Column Q Column R
100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
Proyeksi Penduduk KotaDream Island Tahap II dengan Metode Logaritma 125000 120000 115000 110000 105000
Column Q Column R
100000 95000 90000 2004200620082010201220142016 Tahun
Proyeksi Penduduk Kota Dream Island Tahap II dengan Metode Eksponensial 125000 120000 115000 110000 105000 100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
Column Q Column R
5 5 9 9 9 9 9 9 13 13
0 0 0 0 0 0 0 0
0 0 0 0
100000 95000 90000 2004 2006 2008 2010 2012 2014 2016 Tahun
JumlahPenduduk
Proyeksi Penduduk Kota Drea Island Tahap II dengan Metode Geometri
125000 120000 115000 110000 Column R
105000 100000 95000 90000 2004200620082010201220142016 Tahun
0 2035 2040
OYEKSI PENDUDUK TAHUN 2005-2035
Column S
OYEKSI PENDUDUK TAHUN 2005-2035
212x - 5354363.87055883
Penduduk Linear (Penduduk)
Tabel 4.6 Perbandingan Metode Proyeksi Penduduk Metode Aritmatik
S 321.25
R 0.99
Logaritma 1117.73
0.93
Eksponensial 283.89
1.00
0 0 0 0 0 0 0 0 0
Geometri
1040.21
0
0
0.94
0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0
0 0
0 0 0 0
0
0 0
0 0
0
Hasil Proyeksi Penduduk Per Kecamatan Kota Bukittinggi 2015-2034 No
Tahun
Jumlah Penduduk perkecamatan GP
ABTB
MAKS
Total penduduk (orang)
Rekapitulasi Total Sampah per Kecamatan No
Tahun
1
2015
44945
27235
50306
122485
1
2015
2
2016
45745
27758
51449
124952
2
2016
3
2017
46560
28291
52618
127469
3
2017
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
47389 48233 49092 49966 50856 51762 52683 53622 54577 55549 56538 57545 58570 59613 60674 61755 62855 63974
28834 29388 29953 30528 31115 31713 32322 32943 33576 34221 34878 35548 36231 36927 37637 38360 39097 39848
53813 55036 56286 57565 58872 60210 61577 62976 64407 65870 67366 68897 70462 72063 73700 75374 77086 78837
130037 132657 135331 138059 140843 143684 146583 149541 152559 155639 158783 161990 165263 168602 172011 175488 179037 182659
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Total Timbulan Tingakat pelayanan (%)/Zona Timbulan terlayani Tahun Timbulan Zona I Zona II Zona III Zona I Zona II Zona III Zona I (m3) Eksisti 471.006 172.83 104.73 193.45 83.3 60 33.6 143.97 2016 480.490 175.91 106.74 197.84 86.6 63 37.36 152.34 2017 490.168 179.04 108.79 202.34 89.9 66 40.52 160.96 2018 500.043 182.23 110.88 206.93 93.2 69 43.68 169.84 2019 510.119 185.47 113.01 211.63 96.5 72 46.84 178.98 2020 520.401 188.78 115.18 216.44 100 75 50 188.40 2021 530.893 192.14 117.39 221.36 100 78 54 191.76 2022 541.598 195.56 119.65 226.39 100 81 58 195.17 2023 552.523 199.04 121.95 231.53 100 84 62 198.65 2024 563.670 202.59 124.29 236.79 100 87 66 202.18 2025 575.045 206.20 126.68 242.17 100 90 70 205.78 2026 586.652 209.87 129.11 247.67 100 91 72 209.45 2027 598.496 213.61 131.59 253.30 100 92 74 213.18 2028 610.582 217.41 134.12 259.05 100 93 76 216.98 2029 622.916 221.28 136.70 264.94 100 94 78 220.84 2030 635.501 225.22 139.32 270.95 100 95 80 224.77 2031 648.344 229.23 142.00 277.11 100 96 82 228.78 2032 661.449 233.32 144.73 283.40 100 97 84 232.85 2033 674.823 237.47 147.51 289.84 100 98 86 237.00 2034 688.470 241.70 150.34 296.43 100 99 88 241.22 2035 702.397 246.01 153.23 303.16 100 100 90 245.51 0.00 3.19 463.43 0.688346
ulasi Total Sampah per Kecamatan Kota Bukittinggi 2015-2034 hari biasa Timbulan (m3) GP
ABTB
Total Sampah (m3)
MAKS
Rekapitulasi Total Sampah per Kecamatan Kota Bukitt No
Tahun
Timbulan (m3) GP
172.83
104.73
193.45
471.01
1
2015
181.50
175.91
106.74
197.84
480.49
2
2016
184.73
179.04
108.79
202.34
490.17
3
2017
188.02
182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01
110.88 113.01 115.18 117.39 119.65 121.95 124.29 126.68 129.11 131.59 134.12 136.70 139.32 142.00 144.73 147.51 150.34 153.23
206.93 211.63 216.44 221.36 226.39 231.53 236.79 242.17 247.67 253.30 259.05 264.94 270.95 277.11 283.40 289.84 296.43 303.16
500.04 510.12 520.40 530.89 541.60 552.52 563.67 575.04 586.65 598.50 610.58 622.92 635.50 648.34 661.45 674.82 688.47 702.40
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
191.37 194.78 198.25 201.78 205.37 209.03 212.75 216.54 220.40 224.32 228.32 232.38 236.52 240.73 245.02 249.39 253.83 258.35
Timbulan terlayani Zona II Zona III Zona I 62.84 65.00 67.25 73.91 71.80 81.99 76.51 90.39 81.37 99.13 86.39 108.22 91.57 119.53 96.92 131.30 102.44 143.55 108.13 156.28 114.01 169.52 117.49 178.32 121.07 187.44 124.73 196.88 128.50 206.65 132.36 216.76 136.32 227.23 140.39 238.06 144.56 249.26 148.84 260.86 153.23 272.84
Kenaikan tingkat pelayanan/tahun tingkat pelayanan/kota Zona II Zona III Zona I Zona II Zona III 30.57 13.34 13.80 0 0 0 31.70 14.00 15.38 1.1 0.7 1.6 32.84 14.65 16.73 1.1 0.7 1.3 33.96 15.30 18.08 1.1 0.7 1.3 35.09 15.95 19.43 1.1 0.7 1.4 36.20 16.60 20.80 1.1 0.6 1.4 36.12 17.25 22.52 0 0.6 1.7 36.04 17.89 24.24 0 0.6 1.7 35.95 18.54 25.98 0 0.6 1.7 35.87 19.18 27.73 0 0.6 1.7 35.79 19.83 29.48 0 0.6 1.8 35.70 20.03 30.40 0 0.2 0.9 35.62 20.23 31.32 0 0.2 0.9 35.54 20.43 32.24 0 0.2 0.9 35.45 20.63 33.17 0 0.2 0.9 35.37 20.83 34.11 0 0.2 0.9 35.29 21.03 35.05 0 0.2 0.9 35.20 21.22 35.99 0 0.2 0.9 35.12 21.42 36.94 0 0.2 0.9 35.04 21.62 37.89 0 0.2 1.0 34.95 21.82 38.84 0 0.2 1.0
mpah per Kecamatan Kota Bukittinggi 2015-2034 hari lebaran
38292 38464 38827 39135 39439 41643
Timbulan (m3) ABTB
MAKS
Total Sampah (m3)
109.98
203.15
494.63
112.09
207.77
504.59
114.25
212.49
514.76
116.44 118.68 120.96 123.28 125.65 128.07 130.53 133.03 135.59 138.19 140.85 143.56 146.31 149.12 151.99 154.91 157.88 160.92
217.31 222.25 227.30 232.46 237.74 243.15 248.67 254.32 260.10 266.00 272.05 278.23 284.55 291.01 297.62 304.38 311.30 318.37
525.13 42254 535.71 42627 546.51 43457 557.53 44277 568.77 580.24 591.95 603.89 616.08 628.52 641.21 287.9 654.16 463.43 tngkat 667.38 62.12373 pelayanan 680.87 Kota 694.63 708.68 175.53 723.01 0.378763 737.63
Beban tingkat pelayanan Kota 0 3.4 3.1 3.1 3.1 3.1 2.3 2.3 2.3 2.3 2.3 1.0 1.0 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1
0.03 0.024 271.80 293.50 314.75 336.73 359.48 383.01 402.86 423.39 444.63 466.60 489.31 505.26 521.68 538.59 555.99 573.89 592.33 611.30 630.82 650.91 671.59
57.7 61.1 64.2 67.3 70.5 73.6 75.9 78.2 80.5 82.8 85.1 86.1 87.2 88.2 89.3 90.3 91.4 92.4 93.5 94.5 95.6
62.3 65.5 68.6 71.8 74.9 77.3 79.6 81.9 84.3 86.6 87.6 88.6 89.6 90.6 91.6 92.6 93.6 94.6 95.6 96.6
3.4
22593 22852 23411 23893 24359 24665
40390 40912 42040 43017 44007 44928
25253 25446 26342 26838
46062 46342 48461 49376
349.42 0.3 0.35 0.57 4.75 3.17 17.59 13.07 74.21 463.43 114.01 0.3262836 3092 3092 0.0249515
101275 102228 104278 106045 107805 111236 113569 114415 118260 120491 368.7025
368.7 1.055177 0.3 0.57 4.753 3.17 13.74 39.143 16.61 77.15 116.29 77.15 484.993 116.293 116.293
92.76 74.208
2.9 3.06
0.3 0.57 4.753 3.17 13.74 16.61 61.36
100.503 372.85 473.353
5 5 9 9 9 9 9 9 13 13
0 0 0 33.183 0.027 0.0513 0.42777 0.4121 1.7862 0
0 0 0 0
0 33.183 0.027 0.0513 0.42777 0.4121 1.7862
0.35 0.4 0.81 0.9 0.99 1.08 1.17 1.26 1.95 2.08
0.105
0 0
0.245 0.28 0.567 0.63 0.693 0.756 0.819 0.882 1.365 1.456 0 0 0 0
0.73 -1.08
0.574 -0.819
-0.105
0.351 0.378 0.585 0.624
0
tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
timbulan hari biasa (m3/h)
timbulan jumlah penduduk timbulan (l/h) per orang Domestik 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90
44945 45745 46560 47389 48233 49092 49966 50856 51762 52683 53622 54577 55549 56538 57545 58570 59613 60674 61755 62855 63974
130339.15 132660.38 135022.95 137427.59 139875.05 142366.11 144901.52 147482.09 150108.62 152781.93 155502.84 158272.21 161090.90 163959.79 166879.77 169851.75 172876.67 175955.45 179089.06 182278.48 185524.70
Non Domestik 130.34 132.66 135.02 137.43 139.88 142.37 144.90 147.48 150.11 152.78 155.50 158.27 161.09 163.96 166.88 169.85 172.88 175.96 179.09 182.28 185.52
tahun
26.1 129.61 103.51 3.9659004
42.49 43.25 44.02 44.80 45.60 46.41 47.24 48.08 48.94 49.81 50.69 51.60 52.52 53.45 54.40 55.37 56.36 57.36 58.38 59.42 60.48
timbulan per orang
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
2030 2031 2032 2033 2034 2035
1. Kel. Kayu Kubu
Kelurahan
% Pesebaran
Tahun
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
2. Kel. Pakan Kurai
0.22 0.22 0.22 0.22 0.22 0.22
3. Kel. Benteng Pasar Atas
8.30 11.95 12.64 13.36 14.10 14.86 15.64 15.92 16.20 16.49 16.78 17.08 17.38 17.69 18.01 18.33 18.66 18.99 19.33 19.67 20.02 20.38 6449.60
14.66 21.11 22.33 23.60 24.90 26.24 27.62 28.11 28.61 29.12 29.64 30.17 30.71 31.25 31.81 32.38 32.95 33.54 34.14 34.74 35.36 35.99 2102.57
2.93 4.22 4.46 4.72 4.98 5.24 5.52 5.62 5.72 5.82 5.92 6.03 6.14 6.25 6.36 6.47 6.59 6.70 6.82 6.94 7.07 7.19 8552.17
4450.59848091
12906.7355946459
4207.5958038546
biasa (m3/h)
timbulan ZONA I
Timbulan hari lebaran Total 172.83 175.91 179.04 182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01
Domestik 138.16 140.62 143.12 145.67 148.27 150.91 153.60 156.33 159.12 161.95 164.83 167.77 170.76 173.80 176.89 180.04 183.25 186.51 189.83 193.22 196.66
Non domestik 43.34 44.11 44.90 45.70 46.51 47.34 48.18 49.04 49.91 50.80 51.71 52.63 53.57 54.52 55.49 56.48 57.48 58.51 59.55 60.61 61.69
Total
Tahun 181.50 184.73 188.02 191.37 194.78 198.25 201.78 205.37 209.03 212.75 216.54 220.40 224.32 228.32 232.38 236.52 240.73 245.02 249.39 253.83 258.35
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
timbulan hari biasa (m3/h) jumlah penduduk 44945 45745 46560 47389 48233 49092 49966 50856 51762 52683 53622 54577 55549 56538 57545
timbulan (l/h)
9887.80 10063.89 10243.12 10425.54 10611.21 10800.19 10992.53 11188.30 11387.55 11590.35 11796.77 12006.86 12220.69 12438.33 12659.84
Domestik 9.89 10.06 10.24 10.43 10.61 10.80 10.99 11.19 11.39 11.59 11.80 12.01 12.22 12.44 12.66
Non Domestik 33.62 34.22 34.83 35.45 36.08 36.72 37.37 38.04 38.72 39.41 40.11 40.82 41.55 42.29 43.04
(m3/hari ) 172.83 175.91 179.04 182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01 16.7
Timbulan hari lebaran Total 43.51 44.28 45.07 45.87 46.69 47.52 48.37 49.23 50.11 51.00 51.91 52.83 53.77 54.73 55.70
Domestik
Non domestik
10.48 10.67 10.86 11.05 11.25 11.45 11.65 11.86 12.07 12.29 12.50 12.73 12.95 13.18 13.42
34.29 34.90 35.52 36.16 36.80 37.46 38.12 38.80 39.49 40.20 40.91 41.64 42.38 43.14 43.90
Total 44.77 45.57 46.38 47.21 48.05 48.90 49.77 50.66 51.56 52.48 53.42 54.37 55.34 56.32 57.32
58570 59613 60674 61755 62855 63974 4. Kel. Bukit Cangang Kayu Ramang 5.54 7.98 8.44 8.92 9.41 9.92 10.44 10.62 10.81 11.00 11.20 11.40 11.60 11.81 12.02 12.23 12.45 12.67 12.90 13.13 13.36 13.60
17114.3313985
12885.31 13114.78 13348.34 13586.07 13828.02 14074.29
12.89 13.11 13.35 13.59 13.83 14.07
5. Kel. Aur Tajungkan g Tengah Sawah
6. Kel. Tarok Dipo
17.21 24.78 26.22 27.70 29.23 30.80 32.42 33.00 33.59 34.19 34.80 35.42 36.05 36.69 37.34 38.01 38.68 39.37 40.07 40.79 41.51 42.25
40.15 57.59 60.93 64.38 67.93 71.59 75.36 76.70 78.07 79.46 80.87 82.31 83.78 85.27 86.79 88.34 89.91 91.51 93.14 94.80 96.49 98.21
43.81 44.59 45.38 46.19 47.02 47.85
56.70 57.71 58.73 59.78 60.84 61.93
7. Kel. Bukit Apit Puhun
11.22 16.15 17.09 18.06 19.06 20.08 21.14 21.51 21.90 22.29 22.69 23.09 23.50 23.92 24.34 24.78 25.22 25.67 26.13 26.59 27.06 27.55
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
13.66 13.90 14.15 Ti 14.40 m 14.66 bu la 14.92
44.69 45.48 46.29 47.12 47.96 48.81
58.34 59.38 60.44 61.52 62.61 63.73
Smpah nyang ditampung dengan menggunakan k de ng an pe w mknn ad dan sisa ah mkn daun an 0.00 0.00 K 7.40 0.22 11.95 o m 7.83 0.24 12.64 un 8.28 0.25 13.36 al 8.73 0.26 14.10 9.20 0.28 14.86 9.69 0.29 15.64 9.86 0.30 15.92 23.61 0.71 38.10 24.03 0.73 38.78 24.45 0.74 39.47 24.89 0.75 40.17 25.33 0.76 40.88 25.78 0.78 41.61 26.24 0.79 42.35 30.72 0.93 49.58 31.27 0.94 50.46 31.82 0.96 51.36 32.39 0.98 52.27 32.97 0.99 53.21 33.55 1.01 54.15 34.15 1.03 55.12
Sampah Basah Sampah Kering tingkat mknn besi dan pelayana Timbula dan sisa kertas metal n n (ton/h) mkn daun krtn kain kaca plastik lainnya lain-lain 83.3 143.97 89.20 2.69 19.72 0.63 0.85 23.31 0.09 7.49 87 152.34 94.39 2.85 20.87 0.67 0.90 24.66 0.09 7.92 90 160.96 99.73 3.01 22.05 0.71 0.95 26.06 0.10 8.37 93 169.84 105.23 3.18 23.27 0.75 1.00 27.50 0.10 8.83 97 178.98 110.90 3.35 24.52 0.79 1.06 28.98 0.11 9.31 100 188.40 116.73 3.52 25.81 0.83 1.11 30.50 0.11 9.80 100 191.76 118.81 3.59 26.27 0.84 1.13 31.05 0.12 9.97 100 195.17 120.93 3.65 26.74 0.86 1.15 31.60 0.12 10.15 100 198.65 123.08 3.71 27.21 0.87 1.17 32.16 0.12 10.33 100 202.18 125.27 3.78 27.70 0.89 1.19 32.73 0.12 10.51 100 205.78 127.50 3.85 28.19 0.91 1.21 33.32 0.12 10.70 100 209.45 129.77 3.92 28.69 0.92 1.24 33.91 0.13 10.89 100 213.18 132.09 3.99 29.21 0.94 1.26 34.51 0.13 11.09 100 216.98 134.44 4.06 29.73 0.95 1.28 35.13 0.13 11.28 100 220.84 136.83 4.13 30.26 0.97 1.30 35.75 0.13 11.48 100 224.77 139.27 4.20 30.79 0.99 1.33 36.39 0.13 11.69 100 228.78 141.75 4.28 31.34 1.01 1.35 37.04 0.14 11.90 100 232.85 144.27 4.35 31.90 1.02 1.37 37.70 0.14 12.11 100 237.00 146.84 4.43 32.47 1.04 1.40 38.37 0.14 12.32 100 241.22 149.46 4.51 33.05 1.06 1.42 39.05 0.14 12.54 100 245.51 152.12 4.59 33.64 1.08 1.45 39.75 0.15 12.77 3.34 0.0 0.0 ZONA I
komposisi sampah
timbulan Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
tingkat mknn (m3/hari pelayana Timbula dan sisa kertas ) n n (m3/h) mkn daun krtn kain 43.51 83.5 36.33 22.51 0.68 4.98 0.16 44.28 87 38.44 23.81 0.72 5.27 0.17 45.07 90 40.61 25.16 0.76 5.56 0.18 45.87 93 42.84 26.55 0.80 5.87 0.19 46.69 97 45.15 27.97 0.84 6.19 0.20 47.52 100 47.52 29.44 0.89 6.51 0.21 48.37 100 48.37 29.97 0.90 6.63 0.21 49.23 100 49.23 30.50 0.92 6.74 0.22 50.11 100 50.11 31.05 0.94 6.86 0.22 51.00 100 51.00 31.60 0.95 6.99 0.22 51.91 100 51.91 32.16 0.97 7.11 0.23 52.83 100 52.83 32.73 0.99 7.24 0.23 53.77 100 53.77 33.32 1.01 7.37 0.24 54.73 100 54.73 33.91 1.02 7.50 0.24 55.70 100 55.70 34.51 1.04 7.63 0.25
2030 2031 2032 2033 2034 2035
ung dengan menggunakan kontainer
56.70 57.71 58.73 59.78 60.84 61.93
100 100 100 100 100 100
56.70 57.71 58.73 59.78 60.84 61.93
35.13 35.75 36.39 37.04 37.70 38.37
1.06 1.08 1.10 1.12 1.14 1.16
7.77 7.91 8.05 8.19 8.34 8.48
0.25 0.25 0.26 0.26 0.27 0.27
bentor dan besam
besi dan kertas metal Sampah Sampah krtn kain kaca plastik lainnya lain-lain Basah Kering basah kering 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.64 0.05 0.07 1.93 0.01 0.62 7.63 4.32 4.32 1 1.73 0.06 0.07 2.05 0.01 0.66 8.07 4.57 4.57 1 1.83 0.06 0.08 2.16 0.01 0.69 8.53 4.83 3.38 1 1.93 0.06 0.08 2.28 0.01 0.73 9.00 5.10 3.06 1 2.04 0.07 0.09 2.41 0.01 0.77 9.48 5.37 2.69 1 2.14 0.07 0.09 2.53 0.01 0.81 9.98 5.66 2.27 1 2.18 0.07 0.09 2.58 0.01 0.83 10.16 5.76 2.31 1 5.22 0.17 0.22 6.17 0.02 1.98 24.32 13.78 9.68 2 5.31 0.17 0.23 6.28 0.02 2.02 24.75 14.03 9.26 2 5.41 0.17 0.23 6.39 0.02 2.05 25.19 14.28 8.21 2 5.50 0.18 0.24 6.50 0.02 2.09 25.64 14.53 7.74 2 5.60 0.18 0.24 6.62 0.02 2.13 26.10 14.79 7.88 2 5.70 0.18 0.25 6.74 0.02 2.16 26.56 15.06 6.74 2 5.80 0.19 0.25 6.86 0.03 2.20 27.03 15.32 6.21 2 6.79 0.22 0.29 8.03 0.03 2.58 31.65 17.94 8.00 2 6.91 0.22 0.30 8.17 0.03 2.62 32.21 18.26 7.47 2 7.04 0.23 0.30 8.32 0.03 2.67 32.78 18.58 6.91 2 7.16 0.23 0.31 8.46 0.03 2.72 33.37 18.91 6.34 2 7.29 0.23 0.31 8.61 0.03 2.77 33.96 19.25 5.74 2 7.42 0.24 0.32 8.77 0.03 2.82 34.57 19.59 5.12 2 7.55 0.24 0.33 8.92 0.03 2.87 35.18 19.94 5.21 2
Total Volume (m3/h) Sampah Sampah Basah Kering Tahun 91.89 97.24 102.74 108.41 114.24 120.26 122.40 124.58 126.80 129.05 131.35 133.69 136.07 138.50 140.96 143.47 146.03 148.63 151.28 153.97 156.71
52.09 55.12 58.23 61.45 64.76 68.16 69.38 70.61 71.87 73.15 74.45 75.78 77.13 78.50 79.90 81.32 82.77 84.25 85.75 87.27 88.83
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
S. Jalan 0.99 1.05 1.11 1.17 1.23 1.30 1.32 1.35 1.37 1.40 1.42 1.45 1.47 1.50 1.52 1.55 1.58 1.61 1.64 1.66 1.69
1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Pengom target 3r posan 0 0.00 0 0.00 3 3.08 4 4.34 5 5.71 6 7.22 6 7.34 7 8.72 8 10.14 10 12.91 11 14.45 11 14.71 13 17.69 14 19.39 15 21.14 16 22.96 17 24.82 18 26.75 19 28.74 20 30.79 20 31.34
Total sampah yang di Daur Ulang olah 0.00 0.00 0.00 0.00 1.75 4.83 2.46 6.79 3.24 8.95 4.09 11.31 4.16 11.51 4.94 13.66 5.75 15.89 7.32 20.22 8.19 22.64 8.34 23.04 10.03 27.72 10.99 30.38 11.98 33.13 13.01 35.97 14.07 38.90 15.16 41.92 16.29 45.03 17.45 48.25 17.77 49.11 6.83 7.74
kaca 0.21 0.23 0.24 0.25 0.27 0.28 0.29 0.29 0.30 0.30 0.31 0.31 0.32 0.32 0.33
plastik 5.88 6.22 6.57 6.94 7.31 7.69 7.83 7.97 8.11 8.26 8.40 8.55 8.71 8.86 9.02
besi dan metal Sampah Sampah lainnya lain-lain Basah Kering 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
1.89 2.00 2.11 2.23 2.35 2.47 2.52 2.56 2.61 2.65 2.70 2.75 2.80 2.85 2.90
23.19 24.53 25.92 27.35 28.82 30.33 30.87 31.42 31.98 32.55 33.13 33.72 34.32 34.93 35.56
13.14 13.91 14.69 15.50 16.33 17.19 17.50 17.81 18.13 18.45 18.78 19.11 19.45 19.80 20.15
target 3r 0 2 2 5 5 5 8 8 10 10 10 15 15 15 15
16.72 18.73
Total sampah yang di olah 0.00 0.00 4.83 6.79 8.95 11.30 11.51 13.66 15.89 20.22 22.64 23.04 27.71 30.38 33.13 35.96 38.89 41.91 45.03 48.24 49.10 11.53 12.92 13.14
Pengompos Daur an Ulang 0.00 0.00 0.49 0.28 0.52 0.29 1.37 0.78 1.44 0.82 1.52 0.86 2.47 1.40 2.51 1.42 3.20 1.81 3.26 1.85 3.31 1.88 5.06 2.87 5.15 2.92 5.24 2.97 5.33 3.02
0.33 0.34 0.35 0.35 0.36 0.37
9.18 9.34 9.51 9.68 9.85 10.03
0.03 0.03 0.04 0.04 0.04 0.04
2.95 3.00 3.05 3.11 3.16 3.22
2 2 2 2 2 2 2 3 3 3 3 3 2 2 2 2 2 1 1 1 1
1 1 1 1 1 1 2
2 2 2 2 2 3 3
Total truck 7.63 8.07 5.15 4.24 3.22 2.07 2.11 14.75 13.63 11.04 9.79 9.97 7.16 5.77 8.46 7.04 5.56 4.03 2.44 0.80 0.81
15 5.43 3.08 36.19 20.51 20 7.37 4.18 36.83 20.88 20 7.50 4.25 37.49 21.25 20 7.63 4.33 38.16 21.63 20 7.77 4.40 38.84 22.01 20 7.91 4.48 39.53 22.41 Sampah yang diangkut dengan becak motor volume sampah yang diangkut dengan mknn dan kertas becak sisa mkn daun krtn motor 25.42 0.77 5.62 41.03 26.90 0.81 5.95 5 2 43.42 28.42 0.86 6.28 5 2 45.87 29.99 0.91 6.63 5 2 48.40 31.61 0.95 6.99 6 3 51.01 33.27 1.00 7.36 6 3 53.69 33.86 1.02 7.49 6 3 54.65 34.46 1.04 7.62 7 3 55.62 35.08 1.06 7.76 5 3 56.61 35.70 1.08 7.89 6 3 57.62 36.34 1.10 8.03 6 3 58.65 36.99 1.12 8.18 6 3 59.69 37.64 1.14 8.32 6 3 60.76 38.31 1.16 8.47 6 3 61.84 39.00 1.18 8.62 6 3 62.94 39.69 1.20 8.78 7 4 64.06 40.40 1.22 8.93 7 4 65.20 41.12 1.24 9.09 7 4 66.36 41.85 1.26 9.25 7 4 67.54 42.60 1.29 9.42 8 4 68.75 43.35 1.31 9.59 8 4 69.97 5298.92 159.93 1171.65 8 4 8552.17 0.00
Sampah yang di olah kompos 0.00 0.00 3.38 4.76 6.26 7.91 8.05 9.56 11.12 14.15 15.85 16.13 19.40 21.26 23.19 25.17 27.22 29.34 31.52 33.77 34.37 8.07 9.05 9.20
Total sampah yang di olah 0.00 0.77 0.81 2.14 2.26 2.38 3.87 3.94 5.01 5.10 5.19 7.93 8.07 8.21 8.36
daur ulang 0.00 0.00 1.45 2.04 2.68 3.39 3.45 4.10 4.77 6.07 6.79 6.91 8.31 9.11 9.94 10.79 11.67 12.57 13.51 14.47 14.73
SB
SK 0.00
0.00
0.00 2.13 3.00 3.95 4.99 5.07 6.02 7.01 8.92 9.98 10.16 12.22 13.40 14.61 15.86 17.15 18.48 19.86 21.28 21.65
0.00 1.01 1.42 1.87 2.36 2.41 2.86 3.32 4.23 4.73 4.82 5.80 6.35 6.93 7.52 8.13 8.77 9.42 10.09 10.27
3.46 3.88 3.94
bebab tingkat tingkat timbulan pelayana pelayana m3/h n n 39.26 42.59 44.86 47.20 49.61 50.49 51.39 52.31 53.58 54.53 55.50 56.49 57.50 58.52
368.06 392.2456 405.9437 419.6418 433.3399 433.3399 433.3399 433.3399 436.0787 436.0787 436.0787 436.0787 436.0787 436.0787
306.86 24.1856 13.69811 13.69811 13.69811 0 0 0 2.738711 0 0 0 0 0
Residu sampah 0.00 0.00 1.69 2.38 3.13 3.95 4.03 4.78 5.56 7.07 7.92 8.06 9.70 10.63 11.59 12.58 13.61 14.66 15.75 16.88 17.18
Jumlah Kontaine Tahun r
Sampah Volumeyang angsung ke TPA
sampah Kontainer Kontainer yang 6 m3 8 m3 masuk 2015 ke143.97 13 0 TPA
1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
152.34 156.13 163.04 170.03 177.10 180.25 181.51 182.75 181.97 183.15 186.41 185.47 186.60 187.71 188.81 189.88 190.94 191.97 192.97 196.41
18 18 18 18 15 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0
78.00
97
6 7 7 7 10 15 18 18 23 23 23 23 23 23 24 24 24 24 24 25
8.51 11.54 11.75 11.96 12.17 12.39
kain 0.18 0.19 0.20 0.21 0.22 0.24 0.24 0.24 0.25 0.25 0.26 0.26 0.27 0.27 0.28 0.28 0.29 0.29 0.30 0.30 0.31 37.63
59.56 57.71 58.73 59.78 60.84 61.93
kaca
436.0787 0 415.0943 -20.9843 415.0943 0 415.0943 0 415.0943 0 415.0943 0
plastik 0.24 6.64 0.26 7.03 0.27 7.43 0.29 7.84 0.30 8.26 0.32 8.69 0.32 8.85 0.33 9.01 0.33 9.17 0.34 9.33 0.35 9.50 0.35 9.66 0.36 9.84 0.36 10.01 0.37 10.19 0.38 10.37 0.38 10.56 0.39 10.74 0.40 10.94 0.41 11.13 0.41 11.33 50.46 1384.60
besi dan metal Sampah Sampah lainnya lain-lain Basah Kering 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 5.13
2.13 2.26 2.39 2.52 2.65 2.79 2.84 2.89 2.94 3.00 3.05 3.10 3.16 3.22 3.27 3.33 3.39 3.45 3.51 3.57 3.64 444.71
26.19 27.71 29.28 30.90 32.56 34.27 34.88 35.50 36.14 36.78 37.44 38.10 38.78 39.47 40.17 40.89 41.62 42.36 43.11 43.88 44.66 5458.85
14.84 15.71 16.60 17.51 18.46 19.43 19.77 20.12 20.48 20.85 21.22 21.60 21.98 22.37 22.77 23.18 23.59 24.01 24.44 24.87 25.32 3094.17
Pengadaa pengadaa n6m n 8 m truck 6 m3 truck 8m3 ritasi 0 16 5 6 16 0 1 16 0 0 16 0 10 3 8 0 1 3 9 0 1 3 9 0 1 3 9 0 2 3 9 0 8 0 12 0 2 0 12 0 2 0 12 0 5 0 12 0 1 0 12 0 2 0 12 0 3 0 12 0 3 0 12 0 6 0 12 0 2 0 12 0 2 0 12 0 5 0 13
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
pengadaan pengadaan 8 m 0 0 0 0 0 0 0 0 3 8 0 1 0 1 0 1 0 1 0 1 0 1 0 1 7 5 0 1 0 1 0 1 0 1 0 1 0 1 0 1 7 6
timbulan hari biasa (m3/h) tahun
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
jumlah timbulan pendudu per orang k
2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90
27235 27758 28291 28834 29388 29953 30528 31115 31713 32322 32943 33576 34221 34878 35548 36231 36927 37637 38360 39097 39848
timbulan (l/h)
78980.08 80497.39 82043.86 83620.04 85226.49 86863.81 88532.59 90233.42 91966.93 93733.74 95534.50 97369.85 99240.46 101147.01 103090.18 105070.69 107089.24 109146.57 111243.43 113380.57 115558.77
Non Domesti Domesti k k 78.98 80.50 82.04 83.62 85.23 86.86 88.53 90.23 91.97 93.73 95.53 97.37 99.24 101.15 103.09 105.07 107.09 109.15 111.24 113.38 115.56
25.75 26.24 26.75 27.26 27.78 28.32 28.86 29.42 29.98 30.56 31.14 31.74 32.35 32.97 33.61 34.25 34.91 35.58 36.27 36.96 37.67
Total
104.73 106.74 108.79 110.88 113.01 115.18 117.39 119.65 121.95 124.29 126.68 129.11 131.59 134.12 136.70 139.32 142.00 144.73 147.51 150.34 153.23
timbulan hari biasa (m3/h) tahun
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
jumlah timbulan pendudu per orang k 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
27235 27758 28291 28834 29388 29953 30528 31115 31713 32322 32943
timbulan (l/h) 5991.59 6106.70 6224.02 6343.59 6465.46 6589.67 6716.27 6845.29 6976.80 7110.84 7247.44
Non Domesti Domesti k k 5.99 6.11 6.22 6.34 6.47 6.59 6.72 6.85 6.98 7.11 7.25
20.37 20.76 21.16 21.57 21.98 22.40 22.84 23.27 23.72 24.18 24.64
Total 26.36 26.87 27.39 27.91 28.45 28.99 29.55 30.12 30.70 31.29 31.89
Timbulan hari lebaran
Domestik
Non domestik
83.72 85.33 86.97 88.64 90.34 92.08 93.84 95.65 97.48 99.36 101.27 103.21 105.19 107.22 109.28 111.37 113.51 115.70 117.92 120.18 122.49
26.26 26.77 27.28 27.81 28.34 28.88 29.44 30.00 30.58 31.17 31.77 32.38 33.00 33.63 34.28 34.94 35.61 36.29 36.99 37.70 38.43
Total
109.98 112.09 114.25 116.44 118.68 120.96 123.28 125.65 128.07 130.53 133.03 135.59 138.19 140.85 143.56 146.31 149.12 151.99 154.91 157.88 160.92
Timbulan hari lebaran Domestik
Non domestik
6.35 6.47 6.60 6.72 6.85 6.99 7.12 7.26 7.40 7.54 7.68
20.78 21.18 21.58 22.00 22.42 22.85 23.29 23.74 24.20 24.66 25.13
Total 27.13 27.65 28.18 28.72 29.28 29.84 30.41 31.00 31.59 32.20 32.82
2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
Kelurahan
% Pesebaran 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Tahun 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
33576 34221 34878 35548 36231 36927 37637 38360 39097 39848
el ak an g Ba lo k
11.15 11.68 11.90 12.13 12.36 12.60 12.84 13.09 13.34 13.60 13.86 14.12 14.40 14.67 14.95 15.24 15.53 15.83 16.14 16.45 16.76 17.09
7386.68 7528.59 7673.22 7820.63 7970.88 8124.01 8280.08 8439.16 8601.28 8766.53
Birug o
23.16 24.25 24.72 25.20 25.68 26.17 26.68 27.19 27.71 28.24 28.79 29.34 29.90 30.48 31.06 31.66 32.27 32.89 33.52 34.16 34.82 35.49
7.39 7.53 7.67 7.82 7.97 8.12 8.28 8.44 8.60 8.77
25.11 25.60 26.09 26.59 27.10 27.62 28.15 28.69 29.24 29.81
32.50 33.13 33.76 34.41 35.07 35.75 36.43 37.13 37.85 38.57
7.83 7.98 8.13 8.29 8.45 8.61 8.78 8.95 9.12 9.29
25.62 26.11 26.61 27.12 27.64 28.17 28.72 29.27 29.83 30.40
33.45 34.09 34.74 35.41 36.09 36.79 37.49 38.21 38.95 39.69
A ur K un in g
sa pir an
ku bu ta nj un g
pa ka n la bu ah
la da ng ca kl ah
Pa rit an ta ng
25.94 27.17 27.69 28.22 28.76 29.31 29.88 30.45 31.04 31.63 32.24 32.86 33.49 34.14 34.79 35.46 36.14 36.83 37.54 38.26 39.00 39.75
12.25 12.83 13.08 13.33 13.58 13.84 14.11 14.38 14.66 14.94 15.23 15.52 15.82 16.12 16.43 16.75 17.07 17.40 17.73 18.07 18.42 18.77
5.08 5.32 5.42 5.53 5.63 5.74 5.85 5.96 6.08 6.19 6.31 6.44 6.56 6.68 6.81 6.94 7.08 7.21 7.35 7.49 7.64 7.78
10.75 11.26 11.47 11.69 11.92 12.15 12.38 12.62 12.86 13.11 13.36 13.62 13.88 14.15 14.42 14.69 14.98 15.27 15.56 15.86 16.16 16.47
6.78 7.10 7.24 7.38 7.52 7.66 7.81 7.96 8.11 8.27 8.43 8.59 8.75 8.92 9.09 9.27 9.45 9.63 9.81 10.00 10.19 10.39
4.89 5.12 5.22 5.32 5.42 5.53 5.63 5.74 5.85 5.96 6.08 6.19 6.31 6.43 6.56 6.68 6.81 6.94 7.08 7.21 7.35 7.49
zona B
mknn dan sisa kertas timbulan tingkat p Timbulan mkn daun krtn kain kaca 104.73 60 62.84 38.93 1.18 8.61 0.28 0.37 106.74 63.00 67.25 41.67 1.26 9.21 0.30 0.40 108.79 66.00 71.80 44.49 1.34 9.84 0.32 0.42 110.88 69.00 76.51 47.40 1.43 10.48 0.34 0.45 113.01 72.00 81.37 50.42 1.52 11.15 0.36 0.48 115.18 75.00 86.39 53.52 1.62 11.83 0.38 0.51 117.39 78.0 91.57 56.74 1.71 12.54 0.40 0.54 119.65 81.0 96.92 60.05 1.81 13.28 0.43 0.57 121.95 84.0 102.44 63.47 1.92 14.03 0.45 0.60 124.29 87.0 108.13 67.00 2.02 14.81 0.48 0.64 126.68 90.0 114.01 70.64 2.13 15.62 0.50 0.67 129.11 91.0 117.49 72.80 2.20 16.10 0.52 0.69 131.59 92.0 121.07 75.01 2.26 16.59 0.53 0.71 134.12 93.0 124.73 77.28 2.33 17.09 0.55 0.74 136.70 94.0 128.50 79.62 2.40 17.60 0.57 0.76 139.32 95.0 132.36 82.01 2.48 18.13 0.58 0.78 142.00 96.0 136.32 84.46 2.55 18.68 0.60 0.80 144.73 97.0 140.39 86.98 2.63 19.23 0.62 0.83 147.51 98.0 144.56 89.57 2.70 19.80 0.64 0.85 150.34 99.0 148.84 92.22 2.78 20.39 0.65 0.88 153.23 100.0 153.23 94.94 2.87 20.99 0.67 0.90 interval tgkt pelayanan per tahun 15 3.00 3 1.00 zona B
timbulan tingkat p 26.36 60 26.87 63.00 27.39 66.00 27.91 69.00 28.45 72.00 28.99 75.00 29.55 78.0 30.12 81.0 30.70 84.0 31.29 87.0 31.89 90.0
mknn dan sisa kertas Timbulan mkn daun krtn kain kaca 15.82 9.80 0.30 2.17 0.07 0.09 16.93 10.49 0.32 2.32 0.07 0.10 18.07 11.20 0.34 2.48 0.08 0.11 19.26 11.93 0.36 2.64 0.08 0.11 20.48 12.69 0.38 2.81 0.09 0.12 21.75 13.47 0.41 2.98 0.10 0.13 23.05 14.28 0.43 3.16 0.10 0.14 24.40 15.12 0.46 3.34 0.11 0.14 25.79 15.98 0.48 3.53 0.11 0.15 27.22 16.87 0.51 3.73 0.12 0.16 28.70 17.78 0.54 3.93 0.13 0.17
32.50 33.13 33.76 34.41 35.07 35.75 36.43 37.13 37.85 38.57
91.0 92.0 93.0 94.0 95.0 96.0 97.0 98.0 99.0 100.0
29.58 30.48 31.40 32.35 33.32 34.32 35.34 36.39 37.47 38.57
18.33 18.88 19.45 20.04 20.64 21.26 21.90 22.55 23.21 23.90
0.55 0.57 0.59 0.60 0.62 0.64 0.66 0.68 0.70 0.72
4.05 4.18 4.30 4.43 4.56 4.70 4.84 4.99 5.13 5.28
0.13 0.13 0.14 0.14 0.15 0.15 0.16 0.16 0.16 0.17
0.17 0.18 0.19 0.19 0.20 0.20 0.21 0.21 0.22 0.23
3 1.00 m bu la n un tu k w ad besi dan ah mknn kertas metal ko dan sisa m mkn daun krtn kain kaca plastik lainnya lain-lain un 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.83 0.51 3.72 0.12 0.16 4.40 27.17 0.02 1.41 17.16 0.52 3.79 0.12 0.16 4.48 27.69 0.02 1.44 17.49 0.53 3.87 0.12 0.17 4.57 28.22 0.02 1.47 17.82 0.54 3.94 0.13 0.17 4.66 28.76 0.02 1.50 18.16 0.55 4.02 0.13 0.17 4.75 29.31 0.02 1.52 18.51 0.56 4.09 0.13 0.18 4.84 29.88 0.02 1.55 18.87 0.57 4.17 0.13 0.18 4.93 30.45 0.02 1.58 19.23 0.58 4.25 0.14 0.18 5.02 31.04 0.02 1.61 19.60 0.59 4.33 0.14 0.19 5.12 31.63 0.02 1.64 19.98 0.60 4.42 0.14 0.19 5.22 32.24 0.02 1.68 20.36 0.61 4.50 0.14 0.19 5.32 32.86 0.02 1.71 20.75 0.63 4.59 0.15 0.20 5.42 33.49 0.02 1.74 21.15 0.64 4.68 0.15 0.20 5.53 34.14 0.02 1.78 21.56 0.65 4.77 0.15 0.21 5.63 34.79 0.02 1.81 21.97 0.66 4.86 0.16 0.21 5.74 35.46 0.02 1.84 22.39 0.68 4.95 0.16 0.21 5.85 36.14 0.02 1.88 22.82 0.69 5.05 0.16 0.22 5.96 36.83 0.02 1.92 23.26 0.70 5.14 0.17 0.22 6.08 37.54 0.02 1.95 23.71 0.72 5.24 0.17 0.23 6.19 38.26 0.02 1.99 24.16 0.73 5.34 0.17 0.23 6.31 39.00 0.02 2.03 24.63 0.74 5.45 0.17 0.23 6.44 39.75 0.02 2.07
40 63.83 0.626665
plastik 10.17 10.89 11.62 12.39 13.17 13.99 14.82 15.69 16.58 17.51 18.46 19.02 19.60 20.19 20.80 21.43 22.07 22.73 23.40 24.10 24.81
besi dan metal lainnya 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.07 0.07 0.07 0.07 0.08 0.08 0.08 0.08 0.09 0.09 0.09
Sampah Sampah lain-lain Basah Kering S. Jalan 3.27 3.50 3.73 3.98 4.23 4.49 4.76 5.04 5.33 5.62 5.93 6.11 6.30 6.49 6.68 6.88 7.09 7.30 7.52 7.74 7.97
40.11 42.92 45.83 48.83 51.94 55.14 58.45 61.86 65.39 69.02 72.77 75.00 77.28 79.62 82.02 84.48 87.01 89.61 92.27 95.00 97.81
22.73 24.33 25.98 27.68 29.44 31.25 33.13 35.06 37.06 39.12 41.25 42.51 43.80 45.13 46.49 47.89 49.32 50.79 52.30 53.85 55.44
0.43 0.46 0.50 0.53 0.56 0.60 0.63 0.67 0.71 0.75 0.79 0.81 0.84 0.86 0.89 0.91 0.94 0.97 1.00 1.03 1.06
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Pengom Daur target 3r posan Ulang 0 0.00 0.00 5 2.15 1.22 6 2.75 1.56 6 2.93 1.66 6 3.12 1.77 6 3.31 1.88 6 3.51 1.99 7 4.33 2.45 8 5.23 2.96 9 6.21 3.52 10 7.28 4.12 10 7.50 4.25 12 9.27 5.26 13 10.35 5.87 13 10.66 6.04 14 11.83 6.70 15 13.05 7.40 16 14.34 8.13 17 15.69 8.89 18 17.10 9.69 20 19.56 11.09
2.72
plastik 2.56 2.74 2.93 3.12 3.32 3.52 3.73 3.95 4.17 4.41 4.65
besi dan metal lainnya 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02
Sampah Sampah lain-lain Basah Kering 0.82 0.88 0.94 1.00 1.07 1.13 1.20 1.27 1.34 1.42 1.49
10.10 10.80 11.54 12.29 13.07 13.88 14.71 15.57 16.46 17.37 18.32
5.72 6.12 6.54 6.97 7.41 7.87 8.34 8.83 9.33 9.85 10.38
Pengom Daur target 3r posan Ulang 2 0.20 0.11 3 0.32 0.18 5 0.58 0.33 8 0.98 0.56 10 1.31 0.74 10 1.39 0.79 12 1.77 1.00 12 1.87 1.06 12 1.98 1.12 15 2.61 1.48 15 2.75 1.56
4.79 4.93 5.08 5.24 5.39 5.56 5.72 5.89 6.07 6.24
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
1.54 1.58 1.63 1.68 1.73 1.78 1.84 1.89 1.95 2.01
18.88 19.45 20.04 20.65 21.27 21.90 22.56 23.23 23.92 24.62
17 17 17 18 18 18 20 20 20 20
10.70 11.03 11.36 11.70 12.05 12.42 12.79 13.17 13.56 13.96
3.21 3.31 3.41 3.72 3.83 3.94 4.51 4.65 4.78 4.92
1.82 1.87 1.93 2.11 2.17 2.23 2.56 2.63 2.71 2.79
gerobak s Sampah Di olah
Sampah Sampah Basah Kering 17.34 17.67 18.01 18.36 18.71 19.07 19.44 19.81 20.19 20.58 20.97 21.38 21.79 22.21 22.63 23.07 23.51 23.96 24.42 24.89 25.37
0.00 9.83 10.02 10.21 10.41 10.61 10.81 11.02 11.23 11.44 11.66 11.89 12.12 12.35 12.59 12.83 13.08 13.33 13.58 13.84 14.11 14.38
SB
sb
SK 9.83 9.01 8.92 9.03 9.14 9.25 9.37 9.19 8.99 8.75 8.47 8.59 7.99 7.72 7.82 7.52 7.19 6.84 6.47 6.07 5.19
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
sk 10 10 10 10 10 10 10
sb 9 9 9 9 9 9 9
sk 2 2 2 2 2 2 3 7 7 7 7 8 8 8 8 8 12 12 12 12 12
1 1 1 1 1 1 1 4 4 4 4 5 5 5 5 5 7 7 7 7 7
4
1
4 2
1
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037
Total sampah yang di olah 0.00 3.36 4.31 4.59 4.88 5.18 5.49 6.78 8.20 9.73 11.40 11.75 14.53 16.22 16.71 18.53 20.45 22.46 24.58 26.79 30.65
Total sampah yang di olah 0.32 0.51 0.90 1.54 2.05 2.17 2.77 2.93 3.09 4.08 4.31
Total sampah yang di olah 0.00 3.36 4.31 4.59 4.88 5.18 5.49 6.78 8.19 9.73 11.40 11.75 14.53 16.22 16.70 18.53 20.45 22.46 24.57 26.79 30.65
70 0.00 2.35 3.02 3.21 3.42 3.63 3.85 4.75 5.74 6.81 7.98 8.22 10.17 11.35 11.69 12.97 14.31 15.72 17.20 18.75 21.45
30 0.00 1.01 1.29 1.38 1.46 1.55 1.65 2.04 2.46 2.92 3.42 3.52 4.36 4.86 5.01 5.56 6.13 6.74 7.37 8.04 9.19
6.26 10.71 10.20 12.12
6.60 10.10 5.73 9.45
2.32 4.84 3.58 4.69
Tahun 1.48 1.90 2.02 2.15 2.29 2.42 2.99 3.61 4.29 5.03 5.18 6.41 7.15 7.37 8.17 9.02 9.91 10.84 11.81 13.51
0.70 0.90 0.96 1.02 1.08 1.15 1.42 1.71 2.04 2.38 2.46 3.04 3.39 3.49 3.88 4.28 4.70 5.14 5.60 6.41
1.18 1.51 1.61 1.71 1.81 1.92 2.37 2.87 3.40 3.99 4.11 5.08 5.67 5.84 6.48 7.15 7.86 8.60 9.37 10.72
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2
2.52
0.84
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Volume sampah yang masuk ke TPA 62.84 63.88 67.49 71.92 76.49 81.20 86.07 90.13 94.24 98.40 102.61 105.74 106.54 108.52 111.79 113.83 115.87 117.92 119.98 122.05 122.58
5.03 5.18 5.34 5.82 6.00 6.18 7.07 7.28 7.49 7.72
volume sampah yang diangkut mknn dengan dan sisa becak mkn daun motor 28.47 45.94 29.01 46.83 29.57 47.73 30.14 48.64 30.72 49.58 31.31 50.53 31.91 51.50 32.52 52.49 33.15 53.50 33.78 54.53 34.43 55.57 35.10 56.64 35.77 57.73 36.46 58.84 37.16 59.97 37.87 61.12 38.60 62.30 39.34 63.49 40.10 64.71 40.87 65.96 41.65 67.22 0.00 0.00
0.86 0.88 0.89 0.91 0.93 0.94 0.96 0.98 1.00 1.02 1.04 1.06 1.08 1.10 1.12 1.14 1.16 1.19 1.21 1.23 1.26 0.00
kertas krtn kain kaca plastik 6.29 0.20 0.27 7.44 6.42 0.21 0.28 7.58 6.54 0.21 0.28 7.73 6.66 0.21 0.29 7.88 6.79 0.22 0.29 8.03 6.92 0.22 0.30 8.18 7.06 0.23 0.30 8.34 7.19 0.23 0.31 8.50 7.33 0.24 0.32 8.66 7.47 0.24 0.32 8.83 7.61 0.24 0.33 9.00 7.76 0.25 0.33 9.17 7.91 0.25 0.34 9.35 8.06 0.26 0.35 9.53 8.22 0.26 0.35 9.71 8.37 0.27 0.36 9.90 8.53 0.27 0.37 10.09 8.70 0.28 0.37 10.28 8.87 0.28 0.38 10.48 9.04 0.29 0.39 10.68 9.21 0.30 0.40 10.88 0.00 0.00 0.00 0.00
besi dan metal Sampah lainnya lain-lain Basah 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.00
2.39 2.43 2.48 2.53 2.58 2.63 2.68 2.73 2.78 2.84 2.89 2.95 3.00 3.06 3.12 3.18 3.24 3.30 3.37 3.43 3.50 0.00
29.33 29.89 30.46 31.05 31.65 32.25 32.87 33.50 34.15 34.80 35.47 36.15 36.85 37.56 38.28 39.01 39.76 40.53 41.31 42.10 42.91 0.00
Kotainer 8 m3 pengadaan truck 8 m3 ritasi 0 0 0 8 9 5 8 0 5 9 0 5 10 0 5 10 1 6 11 0 6 11 1 7 12 0 7 12 9 7 13 1 7 13 1 8 13 0 8 14 1 8 14 1 8 14 1 8 14 0 8 15 9 8 15 1 8 15 1 8 15 0 8
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
pengadaan truck 0 5 0 0 0 1 0 1 0 5 0 1 0 1 0 1 0 5 0 1 0
Sampah Kering 16.62 16.94 17.27 17.60 17.94 18.28 18.63 18.99 19.36 19.73 20.11 20.49 20.89 21.29 21.70 22.11 22.54 22.97 23.41 23.86 24.32 0.00
tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
timbulan jumlah per pendudu orang k 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90
50306 51449 52618 53813 55036 56286 57565 58872 60210 61577 62976 64407 65870 67366 68897 70462 72063 73700 75374 77086 78837
timbulan hari biasa (m3/h) timbulan Non Domesti (l/h) Domesti k k
Total
145888.70 149202.82 152592.21 156058.61 159603.75 163229.42 166937.46 170729.73 174608.15 178574.68 182631.31 186780.09 191023.12 195362.54 199800.54 204339.35 208981.27 213728.64 218583.85 223549.36 228627.67
193.45 197.84 202.34 206.93 211.63 216.44 221.36 226.39 231.53 236.79 242.17 247.67 253.30 259.05 264.94 270.95 277.11 283.40 289.84 296.43 303.16
145.89 149.20 152.59 156.06 159.60 163.23 166.94 170.73 174.61 178.57 182.63 186.78 191.02 195.36 199.80 204.34 208.98 213.73 218.58 223.55 228.63
47.56 48.64 49.75 50.88 52.03 53.21 54.42 55.66 56.92 58.22 59.54 60.89 62.27 63.69 65.13 66.61 68.13 69.68 71.26 72.88 74.53
timbulan hari biasa (ton/h) tahun
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
timbulan jumlah per pendudu orang k 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
50306 51449 52618 53813 55036 56286 57565 58872 60210 61577 62976 64407 65870
timbulan Non Domesti (kg/h) Domesti k k 11067.42 11318.83 11575.96 11838.93 12107.87 12382.92 12664.22 12951.91 13246.14 13547.04 13854.79 14169.52 14491.41
11.07 11.32 11.58 11.84 12.11 12.38 12.66 12.95 13.25 13.55 13.85 14.17 14.49
37.63 38.48 39.36 40.25 41.17 42.10 43.06 44.04 45.04 46.06 47.11 48.18 49.27
Total 48.70 49.80 50.93 52.09 53.27 54.48 55.72 56.99 58.28 59.61 60.96 62.35 63.76
Timbulan hari lebaran Domestik
Non domestik
154.64 158.15 161.75 165.42 169.18 173.02 176.95 180.97 185.08 189.29 193.59 197.99 202.48 207.08 211.79 216.60 221.52 226.55 231.70 236.96 242.35
48.51 49.61 50.74 51.89 53.07 54.28 55.51 56.77 58.06 59.38 60.73 62.11 63.52 64.96 66.44 67.95 69.49 71.07 72.68 74.33 76.02
Total 203.15 207.77 212.49 217.31 222.25 227.30 232.46 237.74 243.15 248.67 254.32 260.10 266.00 272.05 278.23 284.55 291.01 297.62 304.38 311.30 318.37
Timbulan hari lebaran Domestik
Non domestik
11.73 12.00 12.27 12.55 12.83 13.13 13.42 13.73 14.04 14.36 14.69 15.02 15.36
38.38 39.25 40.15 41.06 41.99 42.94 43.92 44.92 45.94 46.98 48.05 49.14 50.26
Total 50.11 51.25 52.42 53.61 54.82 56.07 57.34 58.65 59.98 61.34 62.73 64.16 65.62
2028 2029 2030 2031 2032 2033 2034 2035
0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
Kelurahan
% Pesebaran 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Tahun 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
14820.61 15157.28 15501.61 15853.75 16213.90 16582.22 16958.92 17344.17
14.82 15.16 15.50 15.85 16.21 16.58 16.96 17.34
50.39 51.53 52.71 53.90 55.13 56.38 57.66 58.97
Ca m pa go ip uh
camp ago gugu k bulek
K ub u G ul ai ba nc ah
Pu hu n te m bo k
20.11 38.90 39.79 40.69 41.61 42.56 43.53 44.52 45.53 46.56 47.62 48.70 49.81 50.94 52.10 53.28 54.49 55.73 56.99 58.29 59.61 60.97
13.76 26.62 27.22 27.84 28.47 29.12 29.78 30.46 31.15 31.86 32.58 33.32 34.08 34.85 35.65 36.46 37.28 38.13 39.00 39.88 40.79 41.71
11.30 21.86 22.36 22.86 23.38 23.91 24.46 25.01 25.58 26.16 26.76 27.37 27.99 28.62 29.27 29.94 30.62 31.31 32.02 32.75 33.50 34.26
13.43 25.98 26.57 27.17 27.79 28.42 29.07 29.73 30.40 31.09 31.80 32.52 33.26 34.02 34.79 35.58 36.39 37.22 38.06 38.93 39.81 40.71
67366 68897 70462 72063 73700 75374 77086 78837
65.21 66.69 68.21 69.76 71.34 72.96 74.62 76.31
Pu hu n pi ny u ka bu n 13.26 25.65 26.23 26.83 27.44 28.06 28.70 29.35 30.02 30.70 31.40 32.11 32.84 33.59 34.35 35.13 35.93 36.74 37.58 38.43 39.31 40.20
15.71 16.07 16.43 16.80 17.19 17.58 17.98 18.38
51.40 52.57 53.76 54.98 56.23 57.51 58.81 60.15
67.11 68.63 70.19 71.79 73.42 75.08 76.79 78.53
M an gg is ga nti ng
Pu lai an ak air
G ar eg eh
10.00 19.34 19.78 20.23 20.69 21.16 21.64 22.14 22.64 23.15 23.68 24.22 24.77 25.33 25.91 26.49 27.10 27.71 28.34 28.98 29.64 30.32
10.36 20.04 20.50 20.96 21.44 21.93 22.42 22.93 23.45 23.99 24.53 25.09 25.66 26.24 26.84 27.45 28.07 28.71 29.36 30.03 30.71 31.41
5.06 9.79 10.01 10.24 10.47 10.71 10.95 11.20 11.46 11.72 11.98 12.25 12.53 12.82 13.11 13.41 13.71 14.02 14.34 14.67 15.00 15.34
zona C Komposisi Sampah timbulan zona A tingkat mknn (m3/hari pelayana Timbula dan sisa kertas ) n n (m3/h) mkn daun krtn kain kaca 193.45 33.6 65.00 40.27 1.22 8.90 0.29 0.38 197.84 37.4 73.91 45.80 1.38 10.13 0.33 0.44 202.34 40.5 81.99 50.80 1.53 11.23 0.36 0.48 206.93 43.7 90.39 56.00 1.69 12.38 0.40 0.53 211.63 46.8 99.13 61.42 1.85 13.58 0.44 0.58 216.44 50.0 108.22 67.05 2.02 14.83 0.48 0.64 221.36 54.0 119.53 74.06 2.24 16.38 0.53 0.71 226.39 58.0 131.30 81.36 2.46 17.99 0.58 0.77 231.53 62.0 143.55 88.94 2.68 19.67 0.63 0.85 236.79 66.0 156.28 96.83 2.92 21.41 0.69 0.92 242.17 70.0 169.52 105.03 3.17 23.22 0.75 1.00 247.67 72.0 178.32 110.49 3.33 24.43 0.78 1.05 253.30 74.0 187.44 116.14 3.51 25.68 0.82 1.11 259.05 76.0 196.88 121.99 3.68 26.97 0.87 1.16 264.94 78.0 206.65 128.04 3.86 28.31 0.91 1.22 270.95 80.0 216.76 134.31 4.05 29.70 0.95 1.28 277.11 82.0 227.23 140.79 4.25 31.13 1.00 1.34 283.40 84.0 238.06 147.50 4.45 32.61 1.05 1.40 289.84 86.0 249.26 154.44 4.66 34.15 1.10 1.47 296.43 88.0 260.86 161.63 4.88 35.74 1.15 1.54 303.16 90.0 272.84 169.05 5.10 37.38 1.20 1.61 interval per tahun 16.4 3.28 3.0 2.0
zona C
Komposisi Sampah
timbulan zona A tingkat mknn (m3/hari pelayana Timbula dan sisa kertas ) n n (m3/h) mkn daun krtn kain kaca 48.70 33.7 16.41 10.17 0.31 2.25 0.07 0.10 49.80 37.4 18.61 11.53 0.35 2.55 0.08 0.11 50.93 40.5 20.64 12.79 0.39 2.83 0.09 0.12 52.09 43.7 22.75 14.10 0.43 3.12 0.10 0.13 53.27 46.8 24.95 15.46 0.47 3.42 0.11 0.15 54.48 50.0 27.24 16.88 0.51 3.73 0.12 0.16 55.72 54.0 30.09 18.64 0.56 4.12 0.13 0.18 56.99 58.0 33.05 20.48 0.62 4.53 0.15 0.20 58.28 62.0 36.14 22.39 0.68 4.95 0.16 0.21 59.61 66.0 39.34 24.38 0.74 5.39 0.17 0.23 60.96 70.0 42.67 26.44 0.80 5.85 0.19 0.25 62.35 72.0 44.89 27.81 0.84 6.15 0.20 0.26 63.76 74.0 47.18 29.24 0.88 6.46 0.21 0.28
65.21 76.0 66.69 78.0 68.21 80.0 69.76 82.0 71.34 84.0 72.96 86.0 74.62 88.0 76.31 90.0 interval per tahun 16.4 3.28 3.0 2.0 m bu al an w ad ah mknn ko dan sisa m mkn un
K ot o Se la ya n 2.72 5.26 5.38 5.50 5.63 5.76 5.89 6.02 6.16 6.30 6.44 6.59 6.74 6.89 7.05 7.21 7.37 7.54 7.71 7.88 8.06 8.25
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
20.04 20.50 20.96 21.44 21.93 22.42 22.93 23.45 23.99 24.53 25.09 25.66 26.24 26.84 27.45 28.07 56.42 57.70 59.01 60.35 61.72
12.42 12.70 12.99 13.28 13.58 13.89 14.21 14.53 14.86 15.20 15.54 15.90 16.26 16.63 17.01 17.39 34.96 35.75 36.56 37.39 38.24
49.56 52.02 54.57 57.20 59.93 62.75 65.66 68.68
30.71 32.23 33.81 35.44 37.13 38.88 40.69 42.56
kertas krtn
daun 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.52 1.06 1.08 1.10 1.13 1.15
2.75 2.81 2.87 2.94 3.00 3.07 3.14 3.21 3.29 3.36 3.44 3.52 3.60 3.68 3.76 3.85 7.73 7.91 8.08 8.27 8.46
0.93 0.97 1.02 1.07 1.12 1.17 1.23 1.28
kain
6.79 7.13 7.48 7.84 8.21 8.60 9.00 9.41
kaca 0.09 0.09 0.09 0.09 0.10 0.10 0.10 0.10 0.11 0.11 0.11 0.11 0.12 0.12 0.12 0.12 0.25 0.25 0.26 0.27 0.27
0.22 0.23 0.24 0.25 0.26 0.28 0.29 0.30
plastik 0.12 0.12 0.12 0.13 0.13 0.13 0.14 0.14 0.14 0.14 0.15 0.15 0.15 0.16 0.16 0.17 0.33 0.34 0.35 0.36 0.36
3.24 3.32 3.39 3.47 3.55 3.63 3.71 3.80 3.88 3.97 4.06 4.15 4.25 4.35 4.44 4.54 9.13 9.34 9.55 9.77 9.99
0.29 0.31 0.32 0.34 0.35 0.37 0.39 0.41
besi dan metal lainnya 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.04 0.04 0.04
isi Sampah
Potensi Pengomposan dan Daur Ulang
plastik 10.52 11.97 13.27 14.63 16.05 17.52 19.35 21.26 23.24 25.30 27.45 28.87 30.35 31.87 33.46 35.09 36.79 38.54 40.36 42.23 44.17
besi dan metal Sampah Sampah lainnya lain-lain Basah Kering S. Jalan 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.08 0.09 0.09 0.10 0.11 0.11 0.12 0.12 0.13 0.14 0.14 0.15 0.16 0.16
3.38 3.84 4.26 4.70 5.15 5.63 6.22 6.83 7.46 8.13 8.81 9.27 9.75 10.24 10.75 11.27 11.82 12.38 12.96 13.56 14.19
41.49 47.18 52.33 57.70 63.27 69.08 76.30 83.81 91.63 99.75 108.20 113.82 119.64 125.67 131.90 138.36 145.04 151.95 159.11 166.50 174.16
23.52 26.74 29.66 32.70 35.87 39.15 43.25 47.51 51.94 56.54 61.33 64.52 67.82 71.23 74.77 78.42 82.21 86.13 90.18 94.38 98.72
isi Sampah
0.45 0.51 0.57 0.62 0.68 0.75 0.82 0.91 0.99 1.08 1.17 1.23 1.29 1.36 1.43 1.50 1.57 1.64 1.72 1.80 1.88
1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2
5 5 9 9 9 9 9 9 13 13
Pengom target 3r posan 0 0.00 0 0.00 2 1.05 3 1.73 4 2.53 5 3.45 5 3.81 6 5.03 7 6.41 8 7.98 10 10.82 10 11.38 11 13.16 12 15.08 13 17.15 14 19.37 15 21.76 16 24.31 17 27.05 18 29.97 20 34.83
Potensi Pengomposan dan Daur Ulang
plastik 2.66 3.01 3.34 3.68 4.04 4.41 4.87 5.35 5.85 6.37 6.91 7.27 7.64
besi dan metal Sampah Sampah lainnya lain-lain Basah Kering 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03
0.85 0.97 1.07 1.18 1.30 1.42 1.56 1.72 1.88 2.05 2.22 2.33 2.45
10.47 11.88 13.17 14.52 15.93 17.39 19.21 21.10 23.07 25.11 27.24 28.65 30.12
5.94 6.73 7.47 8.23 9.03 9.86 10.89 11.96 13.07 14.23 15.44 16.24 17.07
Pengom Daur target 3r posan Ulang 4 0.42 0.24 5 0.59 0.34 5 0.66 0.37 8 1.16 0.66 10 1.59 0.90 10 1.74 0.99 13 2.50 1.42 15 3.16 1.79 18 4.15 2.35 18 4.52 2.56 20 5.45 3.09 20 5.73 3.25 20 6.02 3.41
Total sampah yang di olah 0.66 0.93 1.03 1.82 2.50 2.72 3.91 4.96 6.51 7.08 8.54 8.98 9.44
8.02 8.42 8.83 9.26 9.70 10.16 10.63 11.12
0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04
2.58 2.71 2.84 2.97 3.12 3.26 3.41 3.57
31.63 33.20 34.83 36.51 38.25 40.05 41.91 43.84
Sampah Sampah lain-lain Basah Kering SB 1.04 1.07 1.09 1.11 1.14 1.17 1.19 1.22 1.25 1.28 1.30 1.33 1.36 1.40 1.43 1.46 2.93 3.00 3.07 3.14 3.21
12.79 13.08 13.38 13.68 13.99 14.31 14.64 14.97 15.31 15.66 16.01 16.38 16.75 17.13 17.52 17.92 36.01 36.83 37.67 38.52 39.40
7.25 7.42 7.58 7.76 7.93 8.11 8.30 8.49 8.68 8.88 9.08 9.28 9.49 9.71 9.93 10.16 20.41 20.88 21.35 21.84 22.33
17.93 18.82 19.74 20.70 21.68 22.70 23.76 24.85
SK 7.25 7.42 7.09 6.94 6.74 6.49 6.50 6.12 5.66 5.12 3.99 3.93 3.31 2.62 1.87 1.05 10.19 9.45 8.64 7.75 5.96
sb
20 20 20 20 20 20 20 20
6.33 6.64 6.97 7.30 7.65 8.01 8.38 8.77
3.59 3.76 3.95 4.14 4.34 4.54 4.75 4.97
1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 3 5 5 5 5 5
12 12 12 12 12 12 12
8 8 8 8 8 8 8
9.91 10.40 10.91 11.44 11.99 12.55 13.13 13.74
sk
2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 2 2 2 2 2
2 2 2 2 2 2 2 5 5 5 5 5 6 6 4 4 8 8 8 9 9
31 25 13
1 1 1.5
2
5 0
1 7 1 5 1
1
31 25 19.5 75.5
59
engomposan dan Daur Ulang
Daur Ulang 0.00 0.00 0.59 0.98 1.43 1.96 2.16 2.85 3.64 4.52 6.13 6.45 7.46 8.55 9.72 10.98 12.33 13.78 15.33 16.99 19.74
Total sampah yang di olah
Total sampah yang di olah
0.00 0.00 1.64 2.71 3.97 5.41 5.98 7.88 10.05 12.50 16.95 17.83 20.62 23.63 26.87 30.35 34.09 38.09 42.38 46.96 54.57
0.00 0.00 1.64 2.71 3.97 5.41 5.98 7.88 10.05 12.50 16.95 17.83 20.62 23.63 26.86 30.35 34.08 38.09 42.37 46.95 54.57
15.75 33.95
11.86 12.51 24.22
S. S.Basah Kering 0.00 0.00 1.15 1.90 2.78 3.79 4.18 5.51 7.03 8.75 11.87 12.48 14.43 16.54 18.81 21.24 23.86 26.66 29.66 32.87 38.20 4 8.30 8.76 16.96
0.00 0.00 0.49 0.81 1.19 1.62 1.79 2.36 3.01 3.75 5.09 5.35 6.19 7.09 8.06 9.10 10.23 11.43 12.71 14.09 16.37 2 3.56 3.75 7.27
Tahun
0.72 1.20 1.75 2.39 2.64 3.47 4.43 5.51 7.48 7.86 9.09 10.42 11.85 13.38 15.03 16.80 18.69 20.71 24.06 2.52
0.34 0.57 0.83 1.13 1.25 1.65 2.10 2.62 3.55 3.73 4.31 4.94 5.62 6.35 7.13 7.97 8.86 9.82 11.41 1.39
0.57 0.95 1.39 1.89 2.09 2.76 3.52 4.37 5.93 6.24 7.21 8.27 9.40 10.62 11.92 13.33 14.82 16.43 19.09 2.09
1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
3
5 3
1
volume sampah yang diangkut mknn besi dan dengan dan sisa kertas metal becak mkn daun krtn kain kaca plastik lainnya motor 52.58 1.59 11.63 0.37 0.50 13.74 84.87 0.05 42.57 1.28 9.41 0.30 0.41 11.12 68.71 0.04 43.54 1.31 9.63 0.31 0.41 11.38 70.27 0.04 44.53 1.34 9.85 0.32 0.42 11.64 71.87 0.04 45.54 1.37 10.07 0.32 0.43 11.90 73.50 0.04 46.58 1.41 10.30 0.33 0.44 12.17 75.17 0.05 47.63 1.44 10.53 0.34 0.45 12.45 76.88 0.05 48.72 1.47 10.77 0.35 0.46 12.73 78.62 0.05 49.82 1.50 11.02 0.35 0.47 13.02 80.41 0.05 50.95 1.54 11.27 0.36 0.49 13.31 82.24 0.05 52.11 1.57 11.52 0.37 0.50 13.62 84.11 0.05 53.30 1.61 11.78 0.38 0.51 13.93 86.02 0.05 54.51 1.65 12.05 0.39 0.52 14.24 87.97 0.05 55.74 1.68 12.33 0.40 0.53 14.57 89.97 0.05 57.01 1.72 12.61 0.40 0.54 14.90 92.01 0.06 58.31 1.76 12.89 0.41 0.56 15.24 94.10 0.06 59.63 1.80 13.18 0.42 0.57 15.58 96.24 0.06 60.98 1.84 13.48 0.43 0.58 15.94 98.43 0.06 62.37 1.88 13.79 0.44 0.59 16.30 100.66 0.06 63.79 1.93 14.10 0.45 0.61 16.67 102.95 0.06 65.24 1.97 14.42 0.46 0.62 17.05 105.29 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Volume sampah Kontainer pengada yang 8 m3 an masuk ke truck TPA 65.00 73.91 80.35 87.68 95.16 102.81 113.56 123.43 133.50 143.78 152.57 160.49 166.82 173.25 179.79 186.42 193.15 199.97 206.89 213.90 218.28
0 9 10 10 12 13 14 15 17 18 19 20 21 22 23 23 24 25 26 27 28
0 10 0 1 1 1 2 1 0 12 1 2 2 1 3 2 0 13 2 3 3
ritasi 0 5 5 6 7 7 8 9 9 10 10 11 11 11 12 12 12 13 13 14 14
pengadaan truck 2 0 2 5 2 2 1 2 1 2 2 1 2 1 2 2 6 2 2 2 2 1 2 2 2 2 1 2 2 7 2 2 3 2 1
lain-lain 4.41 3.57 3.65 3.74 3.82 3.91 4.00 4.09 4.18 4.28 4.37 4.47 4.57 4.68 4.78 4.89 5.00 5.12 5.23 5.35 5.47 0.00
Sampah Sampah Basah Kering 54.17 43.86 44.85 45.87 46.92 47.98 49.07 50.19 51.33 52.49 53.68 54.90 56.15 57.43 58.73 60.07 61.43 62.83 64.25 65.71 67.21 0.00
30.70 24.86 25.42 26.00 26.59 27.20 27.81 28.45 29.09 29.75 30.43 31.12 31.83 32.55 33.29 34.05 34.82 35.61 36.42 37.25 38.09 0.00
Kec. Guguk Panjang 1. Kel. Kayu Kubu 2. Kel. Pakan Kurai 3. Kel. Benteng Pasar Atas
21,490 1,794 3,119 634
22,787 1,880 3,370 662
44,277 3,674 6,489 1,296
100.00 8.30 14.66
29.89 61.96
2.93 4. Kel. Bukit Cangang Kayu Ramang
1,135
5. Kel. Aur Tajungkang Tengah Sawah 6. Kel. Tarok Dipo 7. Kel. Bukit Apit Puhun
3,715
Kec. Mandiangin Koto Selayan 1. Kel. Campago Ipuh 2. Kel. Campago Ggk. Bulek 3. Kel. Kubu Gulai Bancah 4. Kel. Puhun Tembok 5. Kel. Puhun Pintu Kabun 6. Kel. Manggis Ganting 7. Kel. Pulai Anak Air 8. Kel. Garegeh 9. Kel. Koto Selayan Kec. Aur Birugo Tigo Baleh 1. Kel. Belakang Balok 2. Kel. Birugo 3. Aur Kuning 4. Kel. Sapiran 5. Kel. Kubu Tanjung 6. Kel. Pakan Labuah 7. Kel. Ladang Cakiah 8. Kel. Parit Antang Total
1,317
2,452 5.54
3,906
7,621
8,669 2,424 24.261
9,110 2,542 25.115
17,779 4,966 49,376
4,953 3,340
4,978 3453
9,931 6793
2579
3001
5580
17.21 40.15 11.22
20.11 13.76
3,218 3,183
3,411 3,364
6,629 6,547
2,495 2,580 1,214 699 12,657
2,444 2,533 1,285 646 14,181
4,939 5,113 2,499 1,345 26,838
1,170 2,901
1,822 3,316
3,421 1,579 669 1,379 891 647 58,408
3,540 1,709 694 1,506 928 666 62,083
2,992 6,217 6,961 3,288 1,363 2,885 1,819 1,313 120,491
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
11.30 13.43 13.26 10.00 10.36 5.06 2.72
11.15 23.16 25.94 12.25 5.08 10.75 6.78 4.89
Jumlah Kontainer (buah) Jumlah Amroll Truck Zona I Zona II Zona III Zona I Zona II Zona III 0 2 12 0 1 5 2 12 2 1 5 2 12 2 1 5 2 12 2 1 6 2 12 3 1 6 2 12 3 1 6 3 12 3 1 7 7 0 3 4 5 7 0 3 4 6 7 0 3 4 6 7 0 3 4 6 8 0 3 5 6 8 0 3 5 6 8 0 3 5
Total T 0 8 8 8 8 8 8 0 0 0 0 0 0 0
2029 2030 2031 2032 2033 2034 2035
6 7 7 7 7 8 8
8 8 12 12 12 12 12
0 0 0 0 0 0 0
3 4 4 4 4 4 4
5 5 7 7 7 7 7
0 0 0 0 0 0 0
6.29 1.87
36.18 63.83 100.01
0.83 sampah K &P dari sampah kering
84%
83
69.72
0.84 dari sampah kertas dan plastik 0.63 DARI SAMPAH BASAH
5 5 9 9 9 9 9 9 13 13
0
0
0
0
0 0
0 0
0
0
0
0
0 0
0 0
0 0
0 0
0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 0
0 0
0
0 0 0 0
0 0
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Timbulan sampah Total (m3/h) Zona I Zona II Zona III 172.83 104.73 193.45 175.91 106.74 197.84 179.04 108.79 202.34 182.23 110.88 206.93 185.47 113.01 211.63 188.78 115.18 216.44 192.14 117.39 221.36 195.56 119.65 226.39 199.04 121.95 231.53 202.59 124.29 236.79 206.20 126.68 242.17 209.87 129.11 247.67 213.61 131.59 253.30 217.41 134.12 259.05 221.28 136.70 264.94 225.22 139.32 270.95 229.23 142.00 277.11 233.32 144.73 283.40 237.47 147.51 289.84 241.70 150.34 296.43 246.01 153.23 303.16
Target 3R (m3/h) Sampah yang langsung Timbulan Sampah Telayani (m3/h) (m3/h) Zona I Zona II Zona III Zona I Zona II Zona III Zona I 143.97 62.84 65.00 0.00 0.00 0.00 143.97 152.34 67.25 73.91 0.00 3.36 0.00 152.34 160.96 71.80 81.99 4.83 4.31 1.64 156.13 169.84 76.51 90.39 6.79 4.59 2.71 163.04 178.98 81.37 99.13 8.95 4.88 3.97 170.03 188.40 86.39 108.22 11.30 5.18 5.41 177.10 191.76 91.57 119.53 11.51 5.49 5.98 180.25 195.17 96.92 131.30 13.66 6.78 7.88 181.51 198.65 102.44 143.55 15.89 8.19 10.05 182.75 202.18 108.13 156.28 20.22 9.73 12.50 181.97 205.78 114.01 169.52 22.64 11.40 16.95 183.15 209.45 117.49 178.32 23.04 11.75 17.83 186.41 213.18 121.07 187.44 27.71 14.53 20.62 185.47 216.98 124.73 196.88 30.38 16.22 23.63 186.60 220.84 128.50 206.65 33.13 16.70 26.86 187.71 224.77 132.36 216.76 35.96 18.53 30.35 188.81 228.78 136.32 227.23 38.89 20.45 34.08 189.88 232.85 140.39 238.06 41.91 22.46 38.09 190.94 237.00 144.56 249.26 45.03 24.57 42.37 191.97 241.22 148.84 260.86 48.24 26.79 46.95 192.97 245.51 153.23 272.84 49.10 30.65 54.57 196.41
Zona I Sampah ba 91.89 97.24 102.74 108.41 114.24 120.26 122.40 124.58 126.80 129.05 131.35 133.69 136.07 138.50 140.96 143.47 146.03 148.63 151.28 153.97 156.71
Sampah yang langsung ke TPA (m3/h) Zona II Zona III 62.84 65.00 63.88 73.91 67.49 80.35 71.92 87.68 76.49 95.16 81.20 102.81 86.07 113.56 90.13 123.43 94.24 133.50 98.40 143.78 102.61 152.57 105.74 160.49 106.54 166.82 108.52 173.25 111.79 179.79 113.83 186.42 115.87 193.15 117.92 199.97 119.98 206.89 122.05 213.90 122.58 218.28
Total Volume sampah ke TPA 271.80 290.13 303.97 322.64 341.68 361.11 379.88 395.07 410.50 424.15 438.32 452.64 458.82 468.37 479.29 489.05 498.90 508.83 518.84 528.92 537.27
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
zona I zona I Total SampSampah BaSampah KeTotal SampSampah Ba 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.36 2.35 4.83 3.38 1.45 4.31 3.02 6.79 4.76 2.04 4.59 3.21 8.95 6.26 2.68 4.88 3.42 11.30 7.91 3.39 5.18 3.63 11.51 8.05 3.45 5.49 3.85 13.66 9.56 4.10 6.78 4.75 15.89 11.12 4.77 8.19 5.74 20.22 14.15 6.07 9.73 6.81 22.64 15.85 6.79 11.40 7.98 23.04 16.13 6.91 11.75 8.22 27.71 19.40 8.31 14.53 10.17 30.38 21.26 9.11 16.22 11.35 33.13 23.19 9.94 16.70 11.69 35.96 25.17 10.79 18.53 12.97 38.89 27.22 11.67 20.45 14.31 41.91 29.34 12.57 22.46 15.72 45.03 31.52 13.51 24.57 17.20 48.24 33.77 14.47 26.79 18.75 49.10 34.37 14.73 30.65 21.45
Pemilahan Sampah Zona I Zona II Zona III Sampah keSampah ba Sampah kering Sampah ba Sampah kering 52.09 40.11 22.73 41.49 23.52 55.12 42.92 24.33 47.18 26.74 58.23 45.83 25.98 52.33 29.66 61.45 48.83 27.68 57.70 32.70 64.76 51.94 29.44 63.27 35.87 68.16 55.14 31.25 69.08 39.15 69.38 58.45 33.13 76.30 43.25 70.61 61.86 35.06 83.81 47.51 71.87 65.39 37.06 91.63 51.94 73.15 69.02 39.12 99.75 56.54 74.45 72.77 41.25 108.20 61.33 75.78 75.00 42.51 113.82 64.52 77.13 77.28 43.80 119.64 67.82 78.50 79.62 45.13 125.67 71.23 79.90 82.02 46.49 131.90 74.77 81.32 84.48 47.89 138.36 78.42 82.77 87.01 49.32 145.04 82.21 84.25 89.61 50.79 151.95 86.13 85.75 92.27 52.30 159.11 90.18 87.27 95.00 53.85 166.50 94.38 88.83 97.81 55.44 174.16 98.72
Residu Sampah di TPS 3R dan TPST Zona I Zona II Zona III 2015 0.00 0.00 0.00 2016 0.00 1.18 0.00 2017 1.69 1.51 0.57 2018 2.38 1.61 0.95 2019 3.13 1.71 1.39 2020 3.95 1.81 1.89 2021 4.03 1.92 2.09 2022 4.78 2.37 2.76 2023 5.56 2.87 3.52 2024 7.07 3.40 4.37 2025 7.92 3.99 5.93 2026 8.06 4.11 6.24 2027 9.70 5.08 7.21 2028 10.63 5.67 8.27 2029 11.59 5.84 9.40 2030 12.58 6.48 10.62 2031 13.61 7.15 11.92 2032 14.66 7.86 13.33 2033 15.75 8.60 14.82 2034 16.88 9.37 16.43 2035 17.18 10.72 19.09
Tahun
zona I
zona I Sampah KeTotal SampSampah BaSampah Kering 0.00 0.00 0.00 0.00 1.01 0.00 0.00 0.00 1.29 1.64 1.15 0.49 1.38 2.71 1.90 0.81 1.46 3.97 2.78 1.19 1.55 5.41 3.79 1.62 1.65 5.98 4.18 1.79 2.04 7.88 5.51 2.36 2.46 10.05 7.03 3.01 2.92 12.50 8.75 3.75 3.42 16.95 11.87 5.09 3.52 17.83 12.48 5.35 4.36 20.62 14.43 6.19 4.86 23.63 16.54 7.09 5.01 26.86 18.81 8.06 5.56 30.35 21.24 9.10 6.13 34.08 23.86 10.23 6.74 38.09 26.66 11.43 7.37 42.37 29.66 12.71 8.04 46.95 32.87 14.09 9.19 54.57 38.20 16.37 Total residu sampah 0.00 1.18 3.77 4.93 6.23 7.66 8.04 9.91 11.94 14.85 17.84 18.41 21.99 24.56 26.83 29.68 32.68 35.85 39.17 42.68 46.99
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Volume sampah Residu Jumlah terlayani Sampah Sampah yang di TPST ke TPA langsung 0.00 271.80 ke271.80 TPA 290.13 1.18 291.31 303.97 3.77 307.74 322.64 4.93 327.57 341.68 6.23 347.91 361.11 7.66 368.77 379.88 8.04 387.92 395.07 9.91 404.98 410.50 11.94 422.44 177.14 14.85 191.99 240.29 17.84 258.13 252.90 18.41 271.31 292.55 21.99 314.54 335.39 24.56 359.95 381.56 26.83 408.39 431.23 29.68 460.91 484.58 32.68 517.26 508.83 35.85 544.68 518.84 39.17 558.02 528.92 42.68 571.60 537.27 46.99 584.26
Volume sampah ke kontainer Zona I Zona II Zona III S. Basah S. Kering S. Basah S.kering S.basah S.kering 91.89 52.09 40.11 22.73 41.49 23.52 97.24 55.12 40.57 23.32 47.18 26.74 99.36 56.79 42.82 24.69 51.18 29.17 103.65 59.41 45.62 26.30 55.80 31.89 107.98 62.07 48.52 27.97 60.50 34.68 112.34 64.77 51.51 29.70 65.29 37.53 114.34 65.93 54.60 31.48 72.11 41.45 115.01 66.51 57.11 33.03 78.30 45.14 115.67 67.10 59.65 34.60 84.59 48.92 114.90 67.08 62.21 36.20 91.00 52.79 115.51 67.66 64.79 37.83 96.34 56.25 117.56 68.87 66.77 38.98 101.34 59.17 116.67 68.81 67.11 39.44 105.21 61.63 117.23 69.39 68.27 40.26 109.13 64.14 117.77 69.96 70.33 41.48 113.10 66.71 118.30 70.53 71.51 42.33 117.12 69.32 118.80 71.10 72.70 43.19 121.18 71.99 119.29 71.67 73.89 44.05 125.29 74.70 119.75 72.24 75.07 44.93 129.44 77.47 120.20 72.80 76.25 45.81 133.64 80.29 122.34 74.10 76.35 46.25 135.96 82.34
Tahun
0 0 0 0 0 0 0 0 0 0
0 0 0 0 Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Volume sampah Jalan Jumlah becak sampah yang dibutuhkan Zona I Zona II Zona III Zona I Zona II Zona III 0.99 0.43 0.45 1 1 1 1.05 0.46 0.51 1 1 1 1.11 0.50 0.57 1 1 1 1.17 0.53 0.62 1 1 1 1.23 0.56 0.68 1 1 1 1.30 0.60 0.75 1 1 1 0.00 0.63 0.82 2 1 1 1.35 0.67 0.91 2 1 1 1.37 0.71 0.99 2 1 1 1.40 0.75 1.08 2 1 1 1.42 0.79 1.17 2 1 1 1.45 0.81 1.23 2 1 2 0.00 0.84 1.29 2 1 2 0.00 0.86 1.36 2 1 2 0.00 0.89 1.43 2 1 2 0.00 0.91 1.50 2 1 2 1.58 0.94 1.57 2 1 2 1.61 0.97 1.64 2 1 2 1.64 1.00 1.72 2 1 2 0.00 1.03 1.80 2 1 2 1.69 1.06 1.88 2 1 2 1.45
2015 2016 2017 2018 2019 2020 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2035 0 0 Residu Sampah (m3/h) Zona I Zona II Zona III 0 0 0 0 1.18 0 1.69 1.51 0.57 2.38 1.61 0.95 3.13 1.71 1.39 3.95 1.81 1.89 4.03 1.92 2.09 4.78 2.37 2.76 5.56 2.87 3.52 7.07 3.40 4.37 7.92 3.99 5.93 8.06 4.11 6.24 9.70 5.08 7.21 10.63 5.67 8.27 11.59 5.84 9.40 12.58 6.48 10.62 13.61 7.15 11.92 14.66 7.86 13.33 15.75 8.60 14.82 16.88 9.37 16.43 17.18 10.72 19.09
kontainer yang dibutuhkan Zona I Zona II Zona III 0 0 0 1 0 0 0 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 2 2 1 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Volume Sampah yang diolah di TPS3R/ TPST (m3/h) Pengomposan Zona I Zona II Zona III 0.00 0.00 0.00 0.00 1.48 0.00 2.13 1.90 0.72 3.00 2.02 1.20 3.95 2.15 1.75 4.99 2.29 2.39 5.07 2.42 2.64 6.02 2.99 3.47 7.01 3.61 4.43 8.92 4.29 5.51 9.98 5.03 7.48 10.16 5.18 7.86 12.22 6.41 9.09 13.40 7.15 10.42 14.61 7.37 11.85 15.86 8.17 13.38 17.15 9.02 15.03 18.48 9.91 16.80 19.86 10.84 18.69 21.28 11.81 20.71 21.65 13.51 24.06
Zona I 0.00 0.00 1.01 1.42 1.87 2.36 2.41 2.86 3.32 4.23 4.73 4.82 5.80 6.35 6.93 7.52 8.13 8.77 9.42 10.09 10.27
Daur Ulang Zona II Zona III 0.00 0.00 0.70 0.00 0.90 0.34 0.96 0.57 1.02 0.83 1.08 1.13 1.15 1.25 1.42 1.65 1.71 2.10 2.04 2.62 2.38 3.55 2.46 3.73 3.04 4.31 3.39 4.94 3.49 5.62 3.88 6.35 4.28 7.13 4.70 7.97 5.14 8.86 5.60 9.82 6.41 11.41
Residu Sampah (m3/h) Zona I 0.00 0.00 1.69 2.38 3.13 3.95 4.03 4.78 5.56 7.07 7.92 8.06 9.70 10.63 11.59 12.58 13.61 14.66 15.75 16.88 17.18
Zona II 0.00 1.18 1.51 1.61 1.71 1.81 1.92 2.37 2.87 3.40 3.99 4.11 5.08 5.67 5.84 6.48 7.15 7.86 8.60 9.37 10.72
Zona III 0.00 0.00 0.57 0.95 1.39 1.89 2.09 2.76 3.52 4.37 5.93 6.24 7.21 8.27 9.40 10.62 11.92 13.33 14.82 16.43 19.09
zona I zona I zona I Total Sampah Total Sampah Total Sampah Sampah Basah Sampah Kering Sampah Basah Sampah Kering Sampah Basah Sampah Kering 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 1.01 3.36 0.00 0.00 0.00 3.38 1.45 4.83 3.02 1.29 4.31 1.15 0.49 1.64 4.76 2.04 6.79 3.21 1.38 4.59 1.90 0.81 2.71 6.26 2.68 8.95 3.42 1.46 4.88 2.78 1.19 3.97 7.91 3.39 11.30 3.63 1.55 5.18 3.79 1.62 5.41 8.05 3.45 11.51 3.85 1.65 5.49 4.18 1.79 5.98 9.56 4.10 13.66 4.75 2.04 6.78 5.51 2.36 7.88 11.12 4.77 15.89 5.74 2.46 8.19 7.03 3.01 10.05 14.15 6.07 20.22 6.81 2.92 9.73 8.75 3.75 12.50 15.85 6.79 22.64 7.98 3.42 11.40 11.87 5.09 16.95 16.13 6.91 23.04 8.22 3.52 11.75 12.48 5.35 17.83 19.40 8.31 27.71 10.17 4.36 14.53 14.43 6.19 20.62 21.26 9.11 30.38 11.35 4.86 16.22 16.54 7.09 23.63 23.19 9.94 33.13 11.69 5.01 16.70 18.81 8.06 26.86 25.17 10.79 35.96 12.97 5.56 18.53 21.24 9.10 30.35 27.22 11.67 38.89 14.31 6.13 20.45 23.86 10.23 34.08 29.34 12.57 41.91 15.72 6.74 22.46 26.66 11.43 38.09 31.52 13.51 45.03 17.20 7.37 24.57 29.66 12.71 42.37 33.77 14.47 48.24 18.75 8.04 26.79 32.87 14.09 46.95 34.37 14.73 49.10 21.45 9.19 30.65 38.20 16.37 54.57
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Zona I
Timbulan yang diangkut (m3/h) Zona II Zona III 0.00 0.00 0.00 2.35 3.38 3.02 4.76 3.21 6.26 3.42 7.91 3.63 8.05 3.85 9.56 4.75 11.12 5.74 14.15 6.81 15.85 7.98 16.13 8.22 19.40 10.17 21.26 11.35 23.19 11.69 25.17 12.97 27.22 14.31 29.34 15.72 31.52 17.20 33.77 18.75 34.37 21.45
0.00 0.00 1.15 1.90 2.78 3.79 4.18 5.51 7.03 8.75 11.87 12.48 14.43 16.54 18.81 21.24 23.86 26.66 29.66 32.87 38.20
Kebutuhan Becak motor Zona I Zona II Zona III 0 0 0 1 1 1 2 1 2 1 2 1 2 1 3 2 3 2 4 2 4 2 4 2 5 3 5 3 6 3 6 3 6 4 7 4 8 4 8 5 8 5
0 0 2 2 2 2 2 2 2 2 3 3 4 4 5 5 6 6 7 8 9
Tahun Timbulan sampah (m3/h)
Jenis Sarana*
Jumlah Ritasi Pengadaan becak motor
BS/GS (1 m3) S. Basah 2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
7.63 8.07 8.53 9 9.48 9.98 10.16 24.32 24.75 25.19 25.64 26.1 26.56 27.03 35.33 35.95 36.59 37.25 37.91 38.58 39.27
Becak motor (1,5 m3)
S. S. basah S. Kering Kering 4.32 4.57 4.83 5.1 5.37 5.66 5.76 13.78 14.03 14.28 14.53 14.79 15.06 15.32 20.02 20.38 20.74 21.11 21.49 21.87 22.26
1 1 1 1
Tahun Timbulan sampah (m3/h)
2 2 2 2
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
17.34 17.67 18.01 18.36 18.71 19.07 19.44 19.81 20.19 20.58 20.97 21.38 21.79 22.21
3 3 3 3 3 3 3 6 6 6 6 6 6 6 8 8 9 9 9 9 9
BS/GS 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 3 3
Becak Motor S. basah 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 2 2
1 1 5 2
1 1 2 6 2 1 1 1 2
Jumlah Ritasi
Becak motor (1,5 m3)
S. S. basah S. Kering Kering 9.83 10.02 10.21 10.41 10.61 10.81 11.02 11.23 11.44 11.66 11.89 12.12 12.35 12.59
S. Kering
Jenis Sarana
BS/GS (1 m3) S. Basah
S. Basah
S. Basah
pengadaan becak motor
S. Kering 4 4 4 5 5 5 5 5 5 5 5 5 5 5
BS/GS 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Becak Motor 1 1 1 1 1 1 1 1 1 1 1 1 1 1
s. Basah 3 3 3 3 3 3 3 3 3 3 3 3 3 3
1 1 5
1 1 1
2029 2030 2031 2032 2033 2034 2035
22.63 23.07 33.26 33.89 34.55 35.21 35.89
12.83 13.08 18.85 19.21 19.58 19.96 20.34
5 5 5 5 5 6 6 2=2012
Jenis Sarana
BS/GS (1 m3)
2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
12.79 13.08 13.38 13.68 13.99 14.31 14.64 14.97 15.31 15.66 16.01 16.38 16.75 39.88 40.79 41.72 42.66 43.63 44.62 45.64 46.67
11 11 11 11 11 11
Volume sampah Jalan (m3/h) Tahun 2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024
3 3 3 3 3 3 3
5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
13 13 13 14 14 14 17 21 21 21 20 20 20 20 22 22 28 28 28 30 30
4
1 1
Zona I Zona II Zona III 0.99 0.43 0.45 1.05 0.46 0.51 1.11 0.5 0.57 1.17 0.53 0.62 1.23 0.56 0.68 1.3 0.6 0.75 1.32 0.63 0.82 1.35 0.67 0.91 1.37 0.71 0.99 1.4 0.75 1.08
Jumlah Ritasi
Becak motor (1,5 m3)
S. S. basah S. Kering Kering 7.25 7.42 7.58 7.76 7.93 8.11 8.3 8.49 8.68 8.88 9.08 9.28 9.49 22.61 23.12 23.65 24.18 24.73 25.29 25.87 26.46
1 1 1 1 1 1 1
5=2014
Tahun Timbulan sampah (m3/h)
S. Basah
2 2 2 2 2 2 2
7 7 7 7 7 7
S. Basah
S. Kering
2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 8 8 8 9 9 pengadaan 2013
BS/GS 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 2 2 2 2 2
Becak Motor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Jumlah gerobak sampah yang dibutuhkan* Pengadaan gerobak sampah Zona I
Zona II 1 1 1 1 1 1 2 2 2 2
Zona III 1 1 1 1 1 1 1 1 1 1
Zona I 1 1 1 1 1 1 1 1 1 1
Zona II
1 1
Zona III
1
1
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
1.42 1.45 1.47 1.5 1.52 1.55 1.58 1.61 1.64 1.66 1.69
0.79 0.81 0.84 0.86 0.89 0.91 0.94 0.97 1 1.03 1.06
1.17 1.23 1.29 1.36 1.43 1.5 1.57 1.64 1.72 1.8 1.88
2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1
Jumlah Kontainer (buah) Kontainer 6 m
3
Zona I 13 18 18 18 18 15 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0
0 6 7 7 7 10 15 18 18 23 23 23 23 23 23 24 24 24 24 24 25
Zona II 0 8 8 9 10 10 11 11 12 12 13 13 13 14 14 14 14 15 15 15 15
1
1
1 1
1
1
1
Jumlah Amroll Truck(buah)
Kontainer 8 m3
Zona I Tahun 2015** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
1 2 2 2 2 2 2 2 2 2 2
Amroll Truck 8 m3
Dump Truck 8 m3
Zona III 0 9 10 10 12 13 14 15 17 18 19 20 21 22 23 23 24 25 26 27 28
Zona I Zona I 7 7 7 7 7 5 4 2 2 0 0 0 0 0 0 0 0 0 0 0 0
0 4 4 4 4 5 8 9 9 12 12 12 12 12 12 12 12 12 12 12 13 2012=2
Zona II 0 4 4 5 5 5 6 6 6 6 7 7 7 7 7 7 7 8 8 8 8 2013=3
Jumlah Ritasi*
Zona III 0 5 5 5 6 7 7 8 9 9 10 10 11 11 12 12 12 13 13 14 14 2014=2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Pengadaan becak motor
Tahun S. kering
2015 (eksisting)*** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
1 2 1 1
1 2 1 3
1 1
Volume Sarana sampah pewadahan yang Pengadaa Komunal masuk Kontain Kontain n ke TPA er 6 er 8 kontainer (m3/h)* m3** m3** 6 m3 143.97 152.34 160.96 157.95 166.45 175.21 178.33 171.75 174.81 177.92 181.09 184.32 187.6 190.94 176.67 179.82 183.02 186.28 189.6 192.97 196.41
2 pengadaan BS 2012
pengadaan becak motor
2014
13 18 18 18 18 15 10 5 5 0 0 0 0 0 0 0 0 0 0 0 0
0 6 7 7 7 10 15 18 18 23 23 23 23 23 23 24 24 24 24 24 25 12=3
Tahun
Volume sampah yang masuk ke TPA (m3/h)*
5
13=5
Sarana pewada han penambah Komuna an l Kontainer (Kontai Pergantia 8 m3 ner 8 ) n m3** Kontainer
s. kering
3 0 1
1 3
2015 (eksisting)*** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
62.84 67.25 68.21 72.68 77.3 82.07 86.99 92.07 97.31 98.4 103.75 106.92 110.17 113.51 116.93
0 8 8 9 10 10 11 11 12 12 13 13 13 14 14
9 0 0 0 1 1 1 0 0 1 1 0 0 1
0 0 0 0 0 1 1 2 5
1 2
2030 2031 2032 2033 2034 2035
1 2
1
Tahun penamba pergantia pengadaa han n n 0 0 0 1 0 0 3 4 0 0 0 0 0 0 2 0 6 0 0 2 2 2009=5
0 0 5 1 2 0 7 6 0 0 5 1 2 3 6 4 8 0 5 3 2
5 0 2 0 4 2
5 1 2 3 4 4 2 0 5 1 0 2011=2
2015 (eksisting)*** 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
2013=4
115.15 118.6 112.31 115.65 119.07 122.58
Volume sampah yang masuk ke TPA (m3/h)* 65 73.91 81.99 86.77 95.16 103.89 114.75 126.05 129.19 140.65 152.57 160.49 168.7 167.35 175.65 184.25 181.78 190.45 199.41 208.68 218.28
14 14 15 15 15 15
0 0 0 0 0 0
Sarana pewada han Komuna l (Kontai Pengadaa Pergantia ner 8 ) n n m3** Kontainer Kontainer 0 9 10 10 12 13 14 15 17 18 19 20 21 22 23 23 24 25 26 27 28
9 1 1 1 1 2 1
1 2 3 3 1 1 1 1 3 3 5 3 2 2 1
2 1 1 1 0 1 1 0 1 1 1 1
2014=2 Residu Sampah (m3/h)
3 3 3 3 3 3 4 4 4 4
2 3 4 1 1
penamba pergantia pengadaa han n n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 1 0 1 0 0 0 0 0 0 0 0 0
Tahun 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Zona I 0 0 0 4.16 4.38 4.61 4.7 8.19 8.34 8.49
Zona II Zona III 0 0 0 0 1.26 0 1.34 1.26 1.42 1.39 1.51 1.51 1.6 1.67 1.7 1.84 1.79 5.02 3.4 5.47
kontainer yang dibutuhkan* Zona I 0 0 1 1 1 1 1 2 2 2
4 0 5 1 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 asumsi pengadaan 2013
0 0 3 1 0 0 0 0 0 1 3
0 0 3 1 0 0 0 0 0 1 3
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
8.64 8.79 8.95 9.11 15.45 15.73 16.01 16.29 16.58 16.88 17.18
3.59 3.7 3.81 3.93 4.05 6.02 6.2 9.82 10.11 10.41 10.72
pengdaan Amroll truck Zona I
4
Zona II
5
Zona III
5 1 1
1 3 1
1 1
1 1
3
5
6
1
2 1
0 0 0 0 0 0 0 0 1
1 1 5 1
2 1 1 6 3 1
0 13 13 14 15 17 21 23 24 27 29 29 30 30 31 31 31 33 33 34 35
penamba pergantia pengadaa han n n 0 13 0 13 0 0 0 1 0 1 1 0 1 2 0 2 4 1 5 2 2 4 1 4 5 3 3 6 2 0 2 0 1 1 1 5 6 0 2 2 1 5 6 0 5 5 0 5 5 2 6 8 0 1 1 1 2 3 1 0 1
5.93 6.24 6.56 10.33 10.84 11.37 15.9 16.66 17.44 18.25 19.09
2 2 3 3 3 3 3 4 4 4 4
Pengadaa n pergantia kontainer n 8 m3 kontainer
6 1 0 0 3 5 3 0 5 0 0 1 0 0 0 0 0 0 0 1
0 0 0 0 0 1 1 1 3 1 0 0 3 5 3 0 5 0 0 1
5 5 9 9 9 9 9 9 13 13
14=5
Pengadaa n kontainer
9 0 0 0 1 2 2 2 5 1 1 0 1 3
1 2 3 4 5 6 7
0 0 0 0 0 0 0 0
0 0 0 0
2 3 4 1 1
Pengadaa n kontainer penamba pergantia pengadaa han n n 9 1 1 1 1 3 3 3 5 2 2 2 1 4 4 5 4 3 3 2
kontainer yang dibutuhkan* Zona II Zona III 0 0 1 0 1 0 1 1 1 1 1 1 1 1 2 2 2 2 2 2
0 24 27 29 32 36 43 50 53 59 61 62 66 68 69 70 71 76 77 78 80
24 3 2 3 4 7 7 3 6 2 1 4 2 1 1 1 5 1 1 2
12 12 3 2 3 4 7 7 15 18 5 3 7 6
Pengadaan Kontainer Zona I
Zona II
Zona III 1
1
1
1
24 3 2 3 4 7 19 15 9 4 4 8 9 8 16 19 10 4 8 8
5
2 2 3 3 3 3 3 4 4 4 4
2 2 3 3 3 3 3 4 4 4 4
1
1 1
1
1
1 1
1
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0
0 0
0
0 0 0 0
0
5.18
Tahun
Luas Jumlah Tinggi Faktor Volume TPA Sampah timbuna pemadat terpadatk yang ke TPA n an an dibutuhk (m3/h) rencana an (Ha)
2015
271.80
1.2
226.50
10
0.55
0.55
2016
291.31
1.2
242.76
10
0.59
1.13
2017 2018
307.74 327.57
1.2 1.2
256.45 272.97
10 10
0.62 0.66
1.75 2.41
2019
347.91
1.2
289.92
0.70
3.11 3.11
2020
368.77
1.2
307.31
0.74
3.85
2021
387.92
1.2
323.27
0.78
4.63
2022
404.98
1.2
337.48
0.82
5.45
2023
422.44
1.2
352.03
0.85
6.30
2024
191.99
1.2
159.99
0.39
6.69
2025
258.13
1.2
215.11
0.52
7.21
2026
271.31
1.2
226.09
10 10 10 10 10 10 10 10
0.55
7.75
2027
314.54
1.2
262.12
0.63
8.38
2028
359.95
1.2
299.96
0.72
9.11
2029
408.39
1.2
340.32
0.82
9.93
2030
460.91
1.2
384.09
0.93
10.86
2031
517.26
1.2
431.05
1.04
11.90
2032 2033
544.68 558.02
1.2 1.2
453.90 465.01
1.10 1.12
13.00 14.12
2034
571.60
1.2
476.33
1.15
15.27
2035
584.26
1.2
486.88
10 10 10 10 10 10 10 10 10
1.18 16.45
16.45
89.2
22.95
287.9 11.5 388.6
74.09 2.96
8 5.926917
Ruang Pencurahan dan pemilahan Sampah Basah
24
2
Ruang pencacahan Sampah basah
14
1
44.4
2
Ruang pengayakan kompos
9
2
Ruang pengemasan kompos
12
1
Ruang pengomposan
Bank Sampah
6
1
Ruang pencucian dan pengemasan sampah kering daur ulang
12
2
Gudang penyimpanan Kompos dan sampah daur ulang
8.5 -
Lahan penampungan residu sampah
6 -
Ruang kantor dan pos jaga
10.5
Mobilisasi
38.6 -
Area Parkir
Ruang Pencurahan dan pemilahan Sampah Basah Ruang pencacahan Sampah basah Ruang pengomposan Ruang pengayakan kompos Ruang pengemasan kompos Bank Sampah Ruang pencucian dan pengemasan sampah kering daur ulang Gudang penyimpanan Kompos dan sampah daur ulang Lahan penampungan residu sampah Ruang kantor dan pos jaga Mobilisasi Area Parkir
1
24 209
12
44 15 81 12 12 6
2 1 2 2 1 1
20 18 6 14 352.5 50 402.5
2 1 12
Ruang Pencurahan dan pemilahan Sampah Basah Ruang pencacahan Sampah basah Ruang pengomposan Ruang pengayakan kompos Ruang pengemasan kompos Bank Sampah Ruang pencucian dan pengemasan sampah kering daur ulang Gudang penyimpanan Kompos dan sampah daur ulang Lahan penampungan residu sampah Ruang kantor dan pos jaga Mobilisasi Area Parkir
50 28 120 12 12 6
3 1 3 2 1 1
22 30 6 12 Err:522 48 494
2
Err:522
1 14
Tabel 8.5 Rancangan Anggaran Biaya Pengelolaan Persampahan Kota Bu No
Jeni/Alat
1 Aspek Teknis a. Pewadahan Kontainer 6 m3 Konatainer 8 m3 b. pengumpulan becak motor 1,5 m3 Gerobak sampah 1 m3 c. pengangkutan Amroll truck 8 m3 d. Pengolahan
Harga Satuan
Satuan
19,000,000 unit 27,000,000 unit
2016
5 24
24,071,000 unit 1,700,000 unit 390,923,150 unit
Jumlah 2018
2017
3
3
5
1
13
1
2
Optimalisasi TPS 3R Aur Kuning (Zona II) - penamabahan bangunan - Komposter takakura - mesin pencacah - alat pengayak manual - timbangan - sekop - gerobak dorong -Troli Barang -termometer -cangkul 3 2. TPS 3R Tipe I di Zona III - penamabahan bangunan - Komposter takakura - mesin pencacah '- alat pengayak manual - timbangan - sekop - gerobak dorong -Troli Barang -termometer -cangkul 4 3. TPS 3R Tipe II - penamabahan bangunan - Komposter takakura - mesin pencacah '- alat pengayak manual - timbangan - sekop - gerobak dorong -Troli Barang -termometer -cangkul No B 1. 2
Jeni/Alat
1,500,000 250,000 16,500,000 11,000,000 300,000 20,000 350,000 900,000 20,000 50,000
m3 unit
137 14
unit unit unit unit unit unit unit
1 1 2 2 1 1 2
1,500,000 250,000 16,500,000 100,000 11,000,000 20,000 350,000 900,000 20,000 50,000
m3 unit
200
2.5 14 1 1 1 2 2 1 1 2
202.5
200.0 28 1 1 1 2 2 1 1 2
unit unit unit
1,500,000 m3 250,000 16,500,000 11,000,000 300,000 20,000 350,000 900,000 20,000 50,000 Harga Satuan
Satuan
2016
14
Jumlah 2018
2017
Aspek non Teknis Sosialisasi peraturan, perundangan dan sosialisai tentang Perda pengelolaan sampah serta tetribusi pelayanan persampahan/ kebersihan Sosialisasi Pengolahan sampah dengan metode 3R dengan masyarakat
5,000,000 Kali
3
3
3
5,000,000 Kali
3
3
3
3
Pelatihan teknis SDM untuk pengelolaan sampah
Kali
1
4
Pemantauan dan persampahan
pelayanan
5,000,000 Kali
3
5
Penguatan kelembagaan stekholder bidang persampahan (pola hubungan RT, RW , kelurahan, Kecamatan dengan DKP Kota Bukittinggi)
10,000,000 Kali
3
6
Sosialisasi sembarangan
5,000,000 Kali
3
3
3 12
evaluasi
prilaku
tidak
pelaksanaan
membuang
1,000,000
sampah
2
3
7
Sosialisasi dan kampanye tatacara pemilahan sampah dari sumbernya
dan gerakan
5,000,000 Kali
12
12
8
Pelatihan tentang pengolahan sampah untuk Kelompok Swadaya Masyarakat (KSM) yang peduli lingkungan Sosialisasi tentang bank sampah. Total (Rp)
Kali 10,000,000 5,000,000 Kali
1
2
3
3
9
3
lolaan Persampahan Kota Bukittinggi Jangka Pendek (2016-2020) Jumlah 2019
2020
Rencana Anggaran Biaya 2018
2016
2017
105,000,000 504,000,000
63,000,000
2019
2020
63,000,000
63,000,000
84,000,000
3
4
2
0 3
0
105,000,000
21,000,000
42,000,000
0 63,000,000
1
2
273,000,000
0
21,000,000
21,000,000
42,000,000
205,500,000 3,500,000
14
3,500,000
11,000,000 300,000 40,000 700,000 900,000 20,000 100,000 300,000,000 14
303,750,000 14
14
0 0 Jumlah 2019
2020
2016 0
3 3
3,750,000 3,500,000 16,500,000 100,000 11,000,000 40,000 700,000 900,000 20,000 100,000 300,000,000 0 7,000,000 2,800,000 16,500,000 11,000,000 300,000 40,000 700,000 900,000 20,000 0 100,000 0 Rencana Anggaran Biaya 2017 2018 0 0
2,800,000
2,800,000
0 0
0 0
2019
2020 0
0
3 3
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
3
3
2,000,000
0
0
0
15,000,000
0
0
0
15,000,000
30,000,000
0
30,000,000
30,000,000
30,000,000
15,000,000
15,000,000
15,000,000
15,000,000
15,000,000
60,000,000
60,000,000
60,000,000
65,000,000
60,000,000
10,000,000 15,000,000 1,778,812,016
20,000,000 15,000,000 683,172,017
0 15,000,000 257,802,018 3,363,890,090
0 15,000,000 287,302,019
0 15,000,000 356,802,020
3
3
3
13
12
3
1,000,000
3
Tabel 8.1 Rencana Program dan Kegiatan Pengelolaan Persampahan Tahun 2016-2020
No
Program dan Kegiatan
Detail Lokasi
1
2
3
A. Aspek Teknis 1.
2. 3
Penambahan sarana pewadahan, pengumpulan dan pengangkutan sampah a. Kontainer 6 m3 Kota Bukittinggi b.Kontainer 8 m3 c. becak motor 1,5 m3 d. Gerobak sampah d. Amroll Truck Optimalisasi TPS 3R Tipe I Kelurahan Aur Kuning Zona II a. Pembangunan TPS 3R tipe II Kayu Kubu (Zona I) Kelurahan Pulai Anak Aia b. pembangunan TPS 3R tipe I (Zona III)
4
Penutupan TPA sampah Panorama Baru
Kota Bukittinggi
5
Studi pemilihan lokasi TPA sampah
Kota Bukittinggi
B
Aspek non Teknis
1.
seluruh Kecamatan Kota Sosialisasi peraturan, perundangan dan sosialisai tentang Perda Bukittinggi pengelolaan sampah serta tetribusi pelayanan persampahan/ kebersihan
2
Sosialisasi Pengolahan sampah dengan metode 3R dengan masyarakat
seluruh Kecamatan Kota Bukittinggi
3
Pelatihan teknis SDM untuk pengelolaan sampah
Kelurahan Aur Kuning, Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia
4
Pemantauan dan evaluasi pelaksanaan pelayanan persampahan
seluruh Kecamatan Kota Bukittinggi
Kali
5 6 7
Kelurahan Aur Kuning, Penguatan kelembagaan stekholder bidang persampahan (pola hubungan Kelurahan Kayu Kubu, RT, RW , Kelurahan, Kecamatan dengan DKP Kota Bukittinggi) Kelurahan Pulai Anak Aia seluruh Kecamatan Kota Sosialisasi prilaku tidak membuang sampah sembarangan Bukittinggi Kelurahan Aur Kuning, Sosialisasi dan kampanye tatacara dan gerakan pemilahan sampah dari Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia sumbernya
8
Kelurahan Aur Kuning, Pelatihan tentang pengolahan sampah untuk Kelompok Swadaya Kelurahan Kayu Kubu, Masyarakat (KSM) yang peduli lingkungan Kelurahan Pulai Anak Aia
9
Sosialisasi tentang bank sampah.
Kelurahan Aur Kuning, Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia
VIII-3
an Persampahan Tahun 2016-2020
Kebutuhan Penanganan Menyeluruh Volume Satuan 2016 2017 2018 2019 4 5 6 7 8
unit unit unit
5 24
unit Kali Kali
13 1 1
1
Kali
1
1
3 5
3 1
3 2
2020 9
4 0 3
1
Kali
1
paket
1
Kali
3
3
3
3
3
Kali
3
3
3
3
3
Kali
1
2
Kali
3
Kali
3
Kali
3
Kali
3 3
3
3
3
3
3
3
12
12
12
13
12
Kali
1
2
Kali
3
3
3
3
3
VIII-3
No
Jeni/Alat
Harga Satuan
1 Aspek Teknis a. Pewadahan Kontainer 6 m3 Konatainer 8 m3 b. pengumpulan becak motor 1,5 m3 Gerobak sampah 1 m3 c. pengangkutan Amroll truck 8 m3 d. Pengolahan Optimalisasi TPS 3R Aur 2 Kuning (Zona II) 3 2. TPS 3R Tipe I di Zona III 4 3. TPS 3R Tipe II Total (Rp)
No
A. 1.
2. 3
4 5 B
18,000,000 unit 21,000,000 unit
2016
5 24
23,500,000 unit 3,000,000 unit 350,000,000 unit
2017
Jumlah 2018 2019
2020
4
1
3
4
6
1
3
4 3
1
1
2
13
paket paket paket
Program dan Kegiatan
Detail Lokasi
2
3
Penambahan sarana pewadahan, pengumpulan dan pengangkutan sampah a. Kontainer 6 m3 b.Kontainer 8 m3 c. becak motor 1,5 m3 d. Gerobak sampah d. Amroll Truck
Kota Bukittinggi
1
Satuan
Kebutuhan Penanganan Menyeluruh Volume Satuan 2016 2017 2018 2019 2020 4 5 6 7 8 9
Aspek Teknis
Kelurahan Aur Kuning Optimalisasi TPS 3R Tipe I Zona II a. Pembangunan TPS 3R tipe II Kayu Kubu (Zona I) Kelurahan Pulai Anak Aia b. pembangunan TPS 3R tipe I (Zona III) Penutupan TPA sampah Kota Bukittinggi Panorama Baru Studi pemilihan lokasi TPA sampah Kota Bukittinggi Kali Aspek non Teknis
unit unit unit
5 24
unit
13
Kali
1
Kali
1
1
Kali
1
1
3 5
3 1
3 2
4 0 3
1
Kali
1
paket
1
1.
Sosialisasi peraturan, perundangan dan sosialisai tentang Perda pengelolaan seluruh Kecamatan Kota sampah serta tetribusi Bukittinggi pelayanan persampahan/ kebersihan
Kali
3
3
3
3
3
2
Sosialisasi Pengolahan sampah seluruh Kecamatan Kota dengan metode 3R dengan Bukittinggi masyarakat
Kali
3
3
3
3
3
3
Pelatihan teknis SDM untuk pengelolaan sampah
Kelurahan Aur Kuning, Kali Kelurahan Kayu Kubu, Kelurahan Pulai Anak Aia
1
2
4
Pemantauan pelaksanaan persampahan
Kali
3
5
Penguatan kelembagaan stekholder bidang persampahan Kelurahan Aur Kuning, (pola hubungan RT, RW , Kelurahan Kayu Kubu, Kali kelurahan, Kecamatan dengan Kelurahan Pulai Anak Aia DKP Kota Bukittinggi)
3
6
Sosialisasi membuang sembarangan
Kali
3
7
Sosialisasi dan kampanye Kelurahan Aur Kuning, tatacara dan gerakan Kelurahan Kayu Kubu, Kali pemilahan sampah dari Kelurahan Pulai Anak Aia sumbernya
8
9
dan
evaluasi seluruh Kecamatan Kota pelayanan Bukittinggi
prilaku
tidak seluruh Kecamatan Kota sampah Bukittinggi
Pelatihan tentang pengolahan Kali sampah untuk Kelompok Kelurahan Aur Kuning, Swadaya Masyarakat (KSM) Kelurahan Kayu Kubu, yang peduli lingkungan Kelurahan Pulai Anak Aia Sosialisasi sampah.
tentang
bank
Kelurahan Aur Kuning, Kelurahan Kayu Kubu, Kali Kelurahan Pulai Anak Aia
3
3
3
3
3
3
3
3
12
12
12
13
12
1
2
3
3
3
3
3
Rencana Anggaran Biaya 2017 2018 2019
2016
2020
504,000,000
84,000,000
21,000,000
63,000,000
84,000,000
0
126,000,000
21,000,000
63,000,000
84,000,000
273,000,000
0
21,000,000
21,000,000
42,000,000
0 0 316,370,000 0 7,710,000 2,097,820,000 1,150,450,000 206,800,000 3,817,670,000
0 0
0 0
210,410,000 300,000,000
149,800,000 212,800,000
Tahap Jangka Pendek Jangka Menengah Jangka Panjang
Tahap Jangka Pendek Jangka Menengah Jangka Panjang
Tahap Jangka Pendek Jangka Menengah Jangka Panjang
24 3 3 3 4
becak motor 0 5 1 2 0
Jumlah Pewadahan Komunal Jumlah timbulan Konvesional Sistem 3R sampah Kota Terlayani (m3/h) Kontainer 8 m3 Kontainer 8 m3 383.38 48 36 489.73 61 61 672.08 84 80
gerobak sampah 0 0 0 0 3
Amroll truck 13 0 1 1 2
T im b u la n S a m p a h Ko ta (m 3 / h )
Tabel 8.4 Pengadaan jumlah sarana prasarana jangak pendek Kontainer tahun 6 m3 8 m3 2016 5 2017 2018 2019 2020
Jumlah Sarana Pengumpulan Sarana Pengangkutan 700.00 Jumlah timbulan Konvesional Sistem 3R Konvesional Sistem 3R sampah Kota 600.00Amroll Truck Terlayani (m3/h) Becak Motor Becak Motor Amroll Truck 383.38 85 14 24 22 500.00 489.73 109 20 31 29 672.08 149 31 42 35 400.00
Jumlah timbulan sampah Kota Terlayani (m3/h) Konvesional Sistem 3R 383.38 361.11 489.73 438.32 672.08 537.27
300.00 200.00 Jangka Pendek
Jangka Mene Tahp Pere
dek
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
172.83 175.91 179.04 182.23 185.47 188.78 192.14 195.56 199.04 202.59 206.20 209.87 213.61 217.41 221.28 225.22 229.23 233.32 237.47 241.70 246.01
62.84 67.25 71.80 76.51 81.37 86.39 91.57 96.92 102.44 108.13 114.01 117.49 121.07 124.73 128.50 132.36 136.32 140.39 144.56 148.84 153.23
65.00 73.91 81.99 90.39 99.13 108.22 119.53 131.30 143.55 156.28 169.52 178.32 187.44 196.88 206.65 216.76 227.23 238.06 249.26 260.86 272.84
300.66 317.07 332.83 349.12 365.97 383.38 403.24 423.78 445.03 467.00 489.73 505.68 522.11 539.02 556.43 574.34 592.78 611.76 631.29 651.40 672.08 Juml ah timbul an sampah Kota Terl ayani (m3/h) Konvesi onal Si stem 3R
Jangka Menengah Tahp Perencanaan
Jangka Panjang