Perhitungan Penulangan Pile Cap Pondasi Tower Crane.docx

  • Uploaded by: Irvan Maruli
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Perhitungan Penulangan Pile Cap Pondasi Tower Crane.docx as PDF for free.

More details

  • Words: 206
  • Pages: 2
Perhitungan Penulangan Pile Cap Pondasi Tower Crane Desain pile cap menggunakan beton bertulang dengan kualitas beton K-270 dan tulangan baja Ø25. = 350 kg/cm2

Fc’

= 3500 ton/m2 Fy

= 400 MPa = 40000 ton/m2

Ο’ fc’

a T

Cc

T Dalam perhitungan luas bagian yang mengalami tekan digunakan kedua rumus di bawah: 1) 𝐢𝑐 = 𝑇 π‘Ž π‘₯ 𝑏 π‘₯ Ο’ 𝑓𝑐 β€² = 𝐴𝑠 π‘₯ 𝑓𝑦 π‘Ž π‘₯ 5 π‘₯ 0,85 π‘₯ 3500 = 𝐴𝑠 π‘₯ 40000 π‘Ž = 2,689 𝐴𝑠 2) 𝑀𝑛 = 𝐢𝑐 ( 𝑑 βˆ’

1 π‘Ž) 2

678 = 𝐴𝑠 π‘₯ 40000 ( 1,25 βˆ’

678 = 𝐴𝑠 π‘₯ 40000 ( 1,25 βˆ’

1 π‘Ž) 2

1 π‘₯ 2,689 𝐴𝑠) 2

678 = 𝐴𝑠 π‘₯ 40000 ( 1,25 βˆ’

1 π‘₯ 2,689 𝐴𝑠) 2

678 = 𝐴𝑠 π‘₯ 40000 ( 1,25 βˆ’ 1,344 𝐴𝑠) 678 = βˆ’53780 𝐴𝑠² π‘₯ 50000 𝐴𝑠 53780 𝐴𝑠² βˆ’ 50000 𝐴𝑠 + 678 = 0 Dari persamaan di atas didapatkan luas tulangan tarik sebesar: 𝐴𝑠 1 = 0,916 π‘šΒ²

𝐴𝑠 2 = 0,014 π‘šΒ² Ambil nilai: ο‚·

As = 9200 cm2

Penentuan Jumlah Tulangan 𝑛=

𝐴𝑠′ 9200 = = 18,75 Μ΄ 19 π‘π‘’π‘Žβ„Ž 𝐴 Ø25 490,63

Jarak antar tulangan: 𝑆=

500 (19+1)

= 25 cm