200M2 100 M3 P.U

CONCRETO 210

PARTIDA

OPERARIO CUADRILLA

UND DE MEDIDA M3 PRECIO UNITARIO S/284.61

CONCRETO PARA ZAPATAS OFICIAL

C1 C2 C3

3

RENDIMIENTOS R1 R2 R3

25.00

DESCRIPCIÓN ARENA GUESA PIEDRA CHANCADA CEMENTO

UND. M3 M3 BLS

DESCRIPCIÓN OPERARIO OFICIAL PEON OP. DE EQUIPO LIVIANO

UND. hh hh hh hh

PEON 2

OP.EQU.LIVIANO 8

0

MATERIALES SUBTOTAL CANTIDAD P.U PARCIAL 0.53 S/54.24 S/28.75 0.52 S/54.24 S/28.20 9.72 S/16.27 S/158.14

MANO DE OBRA CANTIDAD P.U PARCIAL 0.96 S/17.19 0.64 S/14.57 2.56 S/13.12 S/15.00

EQUIPOS Y HERRAMIENTAS DESCRIPCIÓN UND. CANTIDAD P.U HERRAMIENTAS MANUALES % S/59.41 MEZCLADORA hm S/0.32 VIBRADORA hm S/0.32

SUBTOTAL

S/59.41

SUBTOTAL

S/10.10

S/16.50 S/9.32 S/33.59 S/0.00

PARCIAL 0.03 16 10

S/215.09

S/1.78 S/5.12 S/3.20

TOTAL

S/284.61

DESCRIPCIÓN CEMENTO ARENA GUESA PIEDRA CHANCADA AGUA

UND BLS M3 M3 M3

MATERIALES PRECIO CON IGV PRECIO SIN IGV 19.20 16.27 64.00 54.24 64.00 54.24 4.00 3.39

DESCRIPCIÓN OPERARIO OFICIAL PEON OP. DE EQUIPO LIVIANO

UND hh hh hh hh

MANO DE OBRA PRECIO 17.19 14.57 13.12 15.00

DESCRIPCIÓN HERRAMIENTAS MANUALES MEZCLADORA VIBRADORA

EQUIPOS Y HERRAMIENTAS UND PRECIO CON IGV PRECIO SIN IGV % 0.03 hm 18.88 16.00 hm 11.80 10.00

Related Documents

Precios
October 2019 27
Precios
November 2019 43
Precios
October 2019 29
Precios
October 2019 36
Precios
November 2019 32
Precios
May 2020 13

More Documents from ""

November 2019 13
December 2019 7
Observaciones I.docx
November 2019 26