EJEMPLO DE COSTO DE PRODUCCION TUBERCULILLOS(SISTEMA AEROPONICO ) DETALLE Campaña: 2006-2007 Lote: 59,130 tubérculillos Ubicación: Estación Sta Ana - Hunacayo ============================ =========== ========= ================= =========== ========== ============ ============= Rubro Unidad Precio Coef. de Cantidad Costo Total Porcentaje US $ ponderación US $ US $ total ============================ =========== ========= ================= =========== ========== ============ ============= A. PERSONAL Obrero Tecnico

Jornal/dia Sueldo/mes

6 270

1.00 0.70

10 6

B. INSUMOS Producción Plantas de papa Tutores Nutrientes

planta unidad juegos

0.22 0.20 28.70

1.00 0.05 1.00

*

1,314 1314 2

unidad unidad

Tecnopor (planchas) 2.40 x 1. 20 m Madera (cuartones) 2"x2"x10' Madera (cuartones) Unidad (base) Plástico doble ancho m Cinta adhesiva rollos Silicona chisguetes Barras de aluminio unidad Clavos de 3" Kg Boquillas nebulizadoras unidad Manguera 16 mm

m

1.30 1.80

0.10 0.10

8.48 3.08 1.23 1.54 1.23 3.07 13.85 1.23 2.15

0.05 0.05 0.05 0.10 0.50 0.05 0.05 0.05 0.10

0.16

0.10

** ** * * * ** *** * * * ** **

13 4

1.69 0.72

61 102 57 100 14 10 16 10 88

25.86 15.71 3.51 15.40 8.61 1.54 11.08 0.62 18.92

60

0.96

D. EQUIPO Generador eléctrico unidad Interruptor horarrio unidad Interruptor térmico unidad Bomba Hisdrostal unidad Presurizador (hidroneumático) unidad Tanque rodoplast unidad F. SERVICIOS Luz, agua, teléfono

500.00 50.77 10.77 398.00 80.00 90.90

0.05 0.10 0.10 0.10 0.05 0.05

19

1.00

Cuenta

COSTOS TOTALES: Costos fijos Costos variables PRODUCCION DE MINITUBERCULOS Numero total Precio US$/tuberculillo

* ** ** ** * *

64.85%

360

19.53%

105

5.68%

79

4.32%

104

5.62%

1,841

100.00%

1,317 524

71.53% 28.47%

289 13 57

C. MATERIALES

Tubería PVC Accesorios pvc

1,194 60 1134

1 1 1 1 1 1

25.00 5.08 1.08 39.80 4.00 4.55

5.5

104

59,130 tuberculillos 0.22

COSTO UNITARIO = Costo en US $ por tuberculillo

0.03

============================ =========== ========= ================= =========== ========== ============ =============

NOTAS: (a) Tiempo dedicado a tuberculillos. =

100.00% 70.00% 30.00% 1.00%

*** (b) tiempo de vida útil materiales (campañas)= ** *

2 10 20

(c) porcentaje uso de materiales en papa =

100.00% 40.00% 50.00%

** (d) tiempo de vida útil equipos

10 20 50.00% 100.00%

(años)=

* (e) porcentaje uso de equipos en papa =

Analisis comparativo y rentabilidad Sistema convencional

Indicadores Costos fijos Costos variables Total costos Producción (tuberculillos) Precio (US$/tube) Total Ingresos Beneficios Tasa rentabilidad(%) VAN (US$) TIR (%)

Inversion Inicial (US$)

14,000

Costo/campaña (US$) 404 863 1,267 18,032 0.22 3,967

Sistema Aeropónico Inversion Inicial (US$)

3,500

2,700.1 113 17568 38

Aeropónico Costo/campaña (US$) 1,317 524 1,841 59,130 0.22 13,009 11,167.6 545

122 650