INPLANT TRAINING REPORT
INTRODUCTION TO PPC3
•
PPC3 was formed in Feb’06 as an additional facility to existing PPC1 and PPC 2. Project Execution & Quality control directly under L&T’ supervision.
• •
QA Manual & QC System of PPC3 is under the same management system of HED-Powai.
Approach of PPC3 Since PPC3 is operated by contractors, all the issues are focused towards motivating for high quality & productivity.
Critical mass of each contractors is identified and care is taken to
maintain & retain them during lean period.
These
critical
mass
workers
are
motivated
by
continuous
interaction & on-job training
Weekly planned meetings with PMG.
Extensive Training of young engineers for
Up-gradation of technical knowledge.
Job specific training by experts & seniors.
V .J .T. I , MATUNGA
Page 16
INPLANT TRAINING REPORT
Shops & Facilities Crane (Mt)
x
Length
Height
(m)
(m)
W (m)
Shop 1 Area : 8250 Sq m
Shop 2 Area : 4000 Sq m Open Yard Area : 900 Sq m
Bay1
Nos 30x 2
158
11
19
Bay2
10x 1
158
9
15
Bay3
5 x 1 10x 1
158
9
15
Bay4
5 x 1 5 x 2
122
7.5
12
Bay3
5 x 1
144
5.4
18
--
--
45
--
20
Additional facilities in PPC3
V .J .T. I , MATUNGA
Page 17
INPLANT TRAINING REPORT
•
Shot Blasting & Painting Facility (15 m x 5.7m wide x 7 m
height). •
Radiography Enclosures (13m X 6 m).
•
Steel Yard and Plate Preparation Center – (880 Sq. Mtr.) 10 Ton
crane, 80 m x 11 m x 6 m height. •
Welder Training Center.
•
RT Film Processing and Viewing room.
•
Welding consumables stores.
Plant & Machinery
Plate Rolling M/c Min Dia. – 710 mm Max Width – 2500 mm Max. Thk CS - 40mm
V .J .T. I , MATUNGA
Page 18
INPLANT TRAINING REPORT
EdgePlanin g M/c Max.Length–12.5m Max thk: - 75mm
Boom Mounted Submerged V .J .T. I , MATUNGA
Page 19
INPLANT TRAINING REPORT
Arc Welding M/c.(Total 5 Nos) Maximum Travel: X – 9 m; Y – 6m.
Weld Positioners:Capacity:-10 Tonne.
V .J .T. I , MATUNGA
Capacity: - 30 Tonne.
Page 20