Integration Test Plan Test Scenario : create object link and link objects. No
BUSINESS PROCESS STEPS
1
Preliminary configuration settings for object networking: Assign equipment category in object type net working.
2
Preliminary configuration settings for object networking: Define media type in object links
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
SPRO>PM&C S>Master data in plant maintenance and customer service >Technical objects >Object links>Define object types SPRO>PM&C S>Master data in plant maintenance and customer service >Technical objects >Object links>Define media types
INPUT DATA
OUTPUT DATA / RESULT
Patch/ Reference SAP Doc Reference/
OK / Error (support by Screen Shots)
Category: M Description:Technical system standard. Alpha numeric nos and change documents are not selected.
Equipment category assigned in Object type net working.
Ok
Medium:000001 Short text for medium:H2O Material:
Data accepted,
OK
Medium 000001 is created.
Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
3
1.
BUSINESS PROCESS STEPS
Preliminary configuration settings for object networking: Define number range for object links
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
SPRO>PM&C S>Master data in plant maintenance and customer service >Technical objects >Object links>Define number range for object links.
Create equipment IE01
2
INSTALL EQUIPMENT
IE02
INPUT DATA
Patch/ Reference
OUTPUT DATA / RESULT
SAP Doc Reference/
01:10000000 to 19999999 Data accepted, interval for internal Number range for object 02:20000000 to 29999999 links is created. interval for external number range is selected.
Name: ACFLMC-001 Description:Acid filling machine. Object type:1051 Category: Mechanical Plant:1000 Costcenter: 101010 Work center: ELE-MNT In structur: change installation location > Enter functional location:OP-PROD-P11, Select confirm
OK / Error (support by Screen Shots)
OK
EQUIPMENT: ACFLMC001 IS CREATED.
OK
Equipment has the status installed.
OK
DATA accepted
DATA accepted
Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
3
BUSINESS PROCESS STEPS
List of equipment create
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
IE10
INPUT DATA
OUTPUT DATA / RESULT
Plant:1000 DATA accepted No.of equipment created:3 Reference Equipment: ACFLMC-001. Equipment nos: 1. ACFLMC-002. 2. ACFLMC-003. 3. ACFLMC-004.
Patch/ Reference SAP Doc Reference/
Equipment: ACFLMC-002, ACFLMC-003, ACFLMC-004,
OK / Error (support by Screen Shots)
OK
Are created.
Decription: Acid filling machine. Confim the data transfer from reference equipment to new equipment.
Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
BUSINESS PROCESS STEPS
1
Create Object networking
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
Transaction code: IN07
INPUT DATA
Link: CFL Category: Technical – Standard. Description: Acid flow between pumps 1& 2. Objects Linked: From object: ACFLMC001 To object: ACFLMC-002 . Link number: 1(identification number of the parallel link between objects) Relationship Possible: ONE way Relationship used: one way. Medium:
OUTPUT DATA / RESULT
Object link CFL created.
Patch/ Reference SAP Doc Reference/
OK / Error (support by Screen Shots)
OK
Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
BUSINESS PROCESS STEPS
2
Create Object networking
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
Transaction code: IN07
INPUT DATA
OUTPUT DATA / RESULT
Link: AFL1 Category: Technical – Standard. Description: Acid flow between pumps 1 & 4. Objects Linked: From object: ACFLMC001 To object: ACFLMC-004. Equipment link:
Patch/ Reference SAP Doc Reference/
OK / Error (support by Screen Shots)
Object link AFL 1created.
OK
Object link AFL 2 created.
OK
Link number: 2 Relationship Possible: one way Relationship used: one way. 3
Create Object networking
Transaction code: IN07
Link: AFL 2 Category: Technical – Standard. Description: Acid flow between pumps 2 &3. Objects Linked: From object: ACFLMC002 To object: ACFLMC-003 . Link number: 1 Relationship Possible: one way Relationship used: one way.
Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
BUSINESS PROCESS STEPS
4
Create Object networking
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
INPUT DATA
Patch/ Reference
OUTPUT DATA / RESULT
Transaction code: IN07
Link: AFL 3 Object link Category: Technical – 3 created. Standard. Description: Acid flow between pumps 3 & 4. Objects Linked: From object: ACFLMC003 To object: ACFLMC-004. Link number: 1 Relationship Possible: one way Relationship used: one way.
Test Date 16/04/2007
Approved By
AFL
SAP Doc Reference/
OK / Error (support by Screen Shots)
OK
Comments : Tested By K.Kiran Kumar
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
BUSINESS PROCESS STEPS
4
Create Object networking
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
INPUT DATA
Patch/ Reference
OUTPUT DATA / RESULT
Transaction code: IN07
Link: AFL 4 Object link Category: Technical – 4 created. Standard. Description: Acid flow between pumps 4& 1. Objects Linked: From object: ACFLMC004 To object: ACFLMC-001. Link number: 1 Relationship Possible: one way Relationship used: one way.
Test Date 16/04/2007
Approved By
AFL
SAP Doc Reference/
OK / Error (support by Screen Shots)
OK
Comments : Tested By K.Kiran Kumar
Approved Date
Integration Test Plan Test Scenario : create object link and link objects.
Module - Plant Maintenance Maintenance Cycle
No
BUSINESS PROCESS STEPS
TRANS. CODE
INPUT DATA
4
Create Object networking
Transaction code: IN07
Link: AFL 5 Object link Category: Technical – 5 created. Standard. Description: Acid flow between pumps 4& 1 Objects Linked: From object: ACFLMC004 To object: ACFLMC-001. Link number: 3 Relationship Possible: one way Relationship used: one way.
5
Display Object Links
IN 19
Node; ACFLMC-001 to Node: ACFLMC-004
Patch/ Reference
OUTPUT DATA / RESULT
AFL
Graphical display of equipments connected is displayed.
SAP Doc Reference/
OK / Error (support by Screen Shots)
OK
OK
Displays all links available for the objects mentioned. Select all links, go to extras> Network – graphic > Network.
8 9 10 Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date
Integration Test Plan Test Scenario : create object link and link objects. No
BUSINESS PROCESS STEPS
Module - Plant Maintenance Maintenance Cycle TRANS. CODE
INPUT DATA
OUTPUT DATA / RESULT
Patch/ Reference SAP Doc Reference/
OK / Error (support by Screen Shots)
11 12 13 14 15
Comments : Tested By K.Kiran Kumar
Test Date 16/04/2007
Approved By
Approved Date