NHA Project Overview E-Toll Project M1 Peshawar By NADRA

Project Planned and Started on 01st October,2007

Project Goals       

To bring change in the Old toll collection system To fully computerize and centralize the whole system To develop the system in such a way so as to promote the institutional growth To take advantage of NADRA’s competencies in different domains. To bring in the concept of Express Lane where vehicles will pass through without stopping. To provide hassle free passage for commuters To facilitate the general public by recharging their balance through NADRA Kiosks and Mobile phones.

Project Resources  Technical

Manpower  Administrative Manpower  State of the art Equipment  Tag Issuance Points

Technical Manpower Designation

Authorized

Posted

Deficiency

Remarks

System Engineers

4

4

0

Nil

1

One SE’s services were taken back by PHQ

Technical Support Engr/ Hardware Engr

4

3

H/W Technician

1

1

0

Recently Appointed in T-2 Scale

DEOs

20

20

0

Nil

Administrative Manpower Designation

Authorized

Posted

Deficiency

Remarks

Security Guards

8

7

1

Nil

Drivers

4

1

3

Nil

Shift Schedule Three

shifts of 8 Hours each which are as follows:



First shift from 6am to 2pm



2nd Shift from 2pm to 10pm



3rd Shift from 10pm to 6am

Each

shift consists of following staff members: Designation Position Strength System Engineer

Enrollment Booth

1

Hardware Engineer

Enrollment Booth

1

Tag Writer

Enrollment Booth

1

Tag Recharge

Enrollment Booth

1

Tag Paster

Enrollment Booth

1

Entry Lane Operator

Entry Booth

1

Exit Lane Operator

Exit Booth

1

Security Guards

One at each booth

3

Total Strength Per Shift

10

Equipment Details Enrollment Booth             

3 DELL Systems with one for backup and one for administrative purposes WLL Set with External Antenna Syscan for CNIC reading Form Scanner for Deposit Slip scanning RFID Desktop Reader and Writer 2KVA Techno ware UPS and 1KVA UPS for backup. 1 Thermal Receipt Printer 2 Dot Matrix Printers PCI Cards 2 Long Range RFID Readers with one for replacement. Electricity Generator 3 Stabilizers Iron safe for cash keeping

Continued.. Entry Booth          

One DELL System complete WLL Set for backup network connectivity DVB with Dish Antenna for network connectivity Long Range RFID Reader LED Display Motion Detector Sensor DB Box with Delta DVP 14SS One PCI Card 1 Traffic signal lights 2KVA UPS and Stabilizer

Continued.. Exit Booth          

One DELL System complete 1 Thermal Receipt Printer WLL Set for backup network connectivity Long Range RFID Reader LED Display DB Box with Delta DVP 14SS Two motion detector sensors One PCI Card 2 Traffic signal lights 2KVA UPS and Stabilizer

Tag Issuance Points 



Three Tag issuance points for issuance of RFID Tags will be established at the following locations. a. NSRC Peshawar City b. NSRC Peshawar III c. PHQ For Network Connectivity a. NADRA Net will be used at PHQ b. WLL will be used at other two sites

Tag Issuance Record Tags Issued So Far

Tags Damaged

1263

53

Total

1316

Balance

Cash Collected So Far

875

Rs. 1100640

Financial Expenditure Monthly Expenses Report Date

Cash Received

Expenses

Balance

12-March-08

5000

4971

29

03-May-08

3738

3738

0

02-June-08

4639

4639

0

14-June-08

4092

4086

06

30-June-08

2810

2810

0

Total

20279

20244

35

Backup Facility    

Network connectivity is backed up by introducing WLL sets for entry and exit booths along with Satellite Dish In case of electricity failure generators of NHA provide the backup for entry and exit booths. Our own generator at enrollment booth is also available as a backup option. Two DELL systems are available for backup.

Shortcomings    

Electricity is the major problem that is hampering the smooth flow of operation at enrollment station. Network problem occurs in WLL but not frequently at enrollment site. A Van for the transportation of staff members. Tag issuance sites are not operational yet