New Text Document.txt

  • Uploaded by: putra
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View New Text Document.txt as PDF for free.

More details

  • Words: 53
  • Pages: 1
Skripsi Note : Sumur HLS-E2 trayek 12 1/4" : - section ini menggunakan tipe lumpur water polymer tanpa bentonite - pada trayek 12 1/4" pada kedalaman 1474 mMD terjadi TLC (total lost circulation) - Sistem lumpur pemboran trayek 12 1/4" diganti dengan menggunakan aerated water dan blind drilling sampai kedalaman 2151 mMD -

Related Documents

New Text Document
May 2020 1
New Text Document
June 2020 0
New Text Document
May 2020 1
New Text Document
October 2019 13
New Text Document
October 2019 9

More Documents from ""

Sap Hipertensi.docx
May 2020 34
New Text Document.txt
November 2019 53
Cover.docx
December 2019 40
01 Cover.docx
November 2019 37