New Bid

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View New Bid as PDF for free.

More details

  • Words: 6,002
  • Pages: 44
Est.Check List

Date: 11/6/2009 Project Number: Project Description:

JC-1 Remodel

Address : 3030 Travis St.

SET UP INSTRUCTIONS I. Enter new proposal in project log & assign project number II. Set up physical file folder ( be sure to include all owner & address information on folder cover) III. WITHIN THE SAME DAY the physical file as well as project specifications are to be given to project coordinator office (Delores) At this phase, a project file is to be set up on the "R" drive database which will include all folders & file templates. The project number & owner information will also be set up with accounting at this phase Project specifications are un-bound and all Bid specific forms are to be copied in triplicate IV. Project information is to be entered on bid board SPECIFICATION REVIEW THE FOLLOWING ITEMS ARE TO BE FILLED IN Project Number: Bid Due Date:

JC-1

Plan Deposit Yes No Bid Bond 5% 10% Bid Security Amount Yes No Payment Bond Yes No Performance Bond Yes No Engineering Estimate NONE Project Duration 90 Calendar Days Liquidated Damages Yes / Per Day No Prevailing Wage Rates Yes No Insurance Requirements Limits Policy Type Standard Company Coverage General Liability Workman's Comp Auto Umbrella Yes No Builders Risk Yes No General Conditions Requirements Special Site Conditions Yes No Building Regulations Yes No Site Telephone Existing Portable Site Trailer Y/N Type Rest Rooms Y/N Site Fencing Y/N NA Type Addenda Owner Required Vendors

Long Lead Items Specialty Items

X X X X X

X X

NA NA NA NA X NA OWNER SUPPLIED

X

Job Information Job Name :

J'Ouvert Caribbean Restaurant

Job Number:

JC-1

Job address:

3030 Travis St.

City, State:

Houston, Texas

Owner Name :

Victory Properties

Owner Contact :

Monique Francis

Owner address:

N/A

City, State:

Houston, Texas

Architect#

Date Bid due:

Margin :

Time Bid due: Total Bid Amount

$39,200.00

0.00%

PROJECT #:

JC-1

DUE DATE:

9700 Richmond, Suite 250 Houston, Texas 77042 Ph: (713) 278-2220 Fx: (713) 278-2228

Owner :

Victory Properties Monique Francis N/A Houston, Texas

Job Description : Cost Code 00700 01063 01063

Job : J'Ouvert Caribbean Restaurant

3030 Travis St. Houston, Texas

Remodel Category - Description General Conditions Permit Red-lined Drwgs

Bid Summary No "General Conditions" Cost… Permits (Already Paid For)… All Mechanical, Electrical & Plumbing - Drawings

01710

Final Clean

Contractor to provide post-construction clean-up to ensure a safe work environment for new tenant…

$650.00

0

02050 02050

Demolition Pressure Wash

Contractor to "Demo" (1,265 SF) of existing VCT throughout entire space… Also Contractor is to provide & install an "acidic coat" on floors to breakdown additional debris… Contractor to "Pressure Wash" the entire restaurant area before "Floor Gloss Paint" can be used…

$619.25 $300.00

0 0

06220

Millwork

Contractor to provide & install millwork for (Front cashier station & Prep area in the kitchen)… Contractor is to use a "Poly-Plastic" top for the prep area in the kitchen. (Approx 12')

$550.00

0

07300

Roofing

Contractor to install "exhaust Hood" vent system for the gas stove/ grille…

$1,000.00

0

Drywall

Contractor to install all drywall & framing outlining the restroom & kitchen & all exterior walls (Price includes installed insulation, tape/ float & sanded)… (Price includes hanging restroom door & office door plus all hardware)… NO PAINT: Tenant will paint the space!

$6,800.00

0

Acoustical Ceiling

Contractor to install "Acoustical Ceiling & Grid" in restroom & kitchen/ office area. Approx (442 SF)… (Tenant is supplying materials)

$685.10

0

Paint

Contractor to install floor paint throughout space… (Kitchen: Clear non-slip gloss, Customer Area: Flat Black non-slip gloss). (Tenant is supplying materials)

$506.00

0

Toilet Partitions & Hardware Specialties

Contractor to install restroom accessories: (36" grab bar, 42" grab bar, mirror, tissue dispenser, paper towel dispenser & soap dispenser) Alternate: Contractor to clean & Spray on black paint at the ceiling to make it have a clean finish!

$150.00 $1,265.00

0 0

15400

Plumbing

Contractor to provide & install all the proper plumbing (including restroom fixtures) for this space… (Includes: restroom, 1 hand sink, 3 compartment sink, floor drain in kitchen & 1 mop sink)… ( This restaurant DOES NOT need a "grease trap", there is a grease disposal area outside the building)!

$6,500.00

0

15500

HVAC

Contractor to provide & install all necessary HVAC (including material) in the space.

$6,000.00

0

16000

Electrical

Contractor to provide & install all necessary elec (including material & light fixtures) throughout the space. Subtotal Profit Tax's

$12,000.00 $39,200.00 $0.00 $0.00

0 $0.00 $0.00 $0.00

Grand Total

$39,200.00

$0.00

09250 09510 09900 10800 10000

Estimator :

Jamel A.Coleman

** Note: This is a labor only quote **

Bid Prices Alternates $0.00 $0.00 $2,174.65

0 0 0

JC-1

00700 General Conditions

Margin =

Description General Conditions General Conditions Mileage Insurance Architect Fees

Units $ Hour

Quantity 0 0

Unit Cost 0.04 28.50 0.47 1.50%

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

No "General Conditions" Cost…

TOTALS

0.00

0.00

$0.00

$0.00

JC-1

01063 Permit

Margin =

Description Certificate of Occupancy Certificate of Compliance One Stop Express Permit Fees

Units

Quantity 0

$1,000

0

Unit Cost 350 55 0

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total Alternate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Permits (Already Paid For)…

TOTALS

0.00

0.00

$0.00

0

J'Ouvert Caribbean Restaurant JC-1 01063 Red-lined Drwgs

Margin =

Description MAN LIFT BOOM LIFT SCISSOR LIFT WAREHOUSE FORKLIFT TERRAIN FORKLIFT SMALL FRONT-END LOADER AIR COMPRESSOR JACKHAMMER/HOSES CHISELS / POINTS/ EACH CONCRETE SAW MASONRY SAW TRAFFIC CONES TRAFFIC BARRIERS SCAFFOLDING 6' W LADDER WATER PUMPS 2" MIM. HAMMER DRILL HAMMER DRILL BIT

Units Week Week Week Week Week Week Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily Daily

Quantity

0 0 0 0

0

1

Unit Cost 600.00 600.00 400.00 480.00 750.00 325.00 255.00 185.00 5.00 110.00 75.00 5.00 7.00 58.00 45.00 35.00 6.00 2174.65

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2174.65

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total Alternate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,174.65

All Mechanical, Electrical & Plumbing - Drawings

TOTALS

2174.65

0.00

$2,174.65

$0.00

J'Ouvert Caribbean Restaurant JC-1 01710 Final Clean

Description Final clean

Margin =

Units sf

Quantity 0

Unit Cost 0.18

1

1

650

Subtotal 0.00 0.00 650.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total Alternates $0.00 $0.00 $650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Contractor to provide post-construction clean-up to ensure a safe work environment for new tenant…

TOTALS

650.00

0.00

$650.00

J'Ouvert Caribbean Restaurant JC-1 02050 Demolition

Description Dumpster Delivery Charge 20 Yard Dumpster 30 Yard Dumpster 40 Yard Dumpster Demo Carpet Demo VCT Demo Ceiling Demo Drywall Demo Doors and Frames

Margin =

Units ea ea ea ea sf sf sf lf ea

Quantity 0

1265

1

Unit Cost 50 210 250 300 1.5 0.45 0.08 8.5 15 50

Subtotal 0.00 0.00 0.00 0.00 0.00 569.25 0.00 0.00 0.00 0.00 50.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total Alternates $0.00 $0.00 $0.00 $0.00 $0.00 $569.25 $0.00 $0.00 $0.00 $0.00 $50.00 $0.00 $0.00

Contractor to "Demo" (1,265 SF) of existing VCT throughout entire space… Also Contractor is to provide & install an "acidic coat" on floors to breakdown additional debris…

TOTALS

619.25

0.00

$619.25

J'Ouvert Caribbean Restaurant

JC-1

02510 Sitework Description

TOTALS

Margin = Units

Quantity

Unit Cost

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00% Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009 Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

$0.00

J'Ouvert Caribbean Resta 02050 Pressure Wash

Description SILT FENCING STEEL STAKE SILT FENCING FOR INLETS TEMPORARY 6' CHAINLINK TEMPORARY 8' CHAINLINK COMMERCIAL 6' CHAINLINK COMMERCIAL 8' CHAINLINK Chainlink Corner Post CEDAR 6' CEDAR 8' WROUGHT IRON 6' WROUGHT IRON 8' ChainLink Ramp Guardrail

Margin = 0.00% Unit Units Quantity Cost lf 1.05 ea 50.00 lf 2.50 lf 5.00 lf 7.00 lf 9.00 ea 1.25 lf 14.00 lf 16.00 lf 25.00 lf 29.00 lf 0 950 0 0.3 1 300

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 300.00 0

Contractor to "Pressure Wash" the entire restaurant area before "Floor Gloss Paint" can be used…

TOTALS

300.00

0.00

an Restaurant JC-1

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $300.00

$300.00

$0.00

J'Ouvert Caribbean Restaurant JC-1 03300 Concrete Repair

Description 4" SMALL MIN. (500 sf) 5"SMALL MIN. 6" SMALL MIN. 4" LARGE (1000 sf) 5" LARGE 6" LARGE CURB MIN. CLUB LARGE

TOTALS

Margin = 0.00%

Units Quantity sf sf sf sf sf sf lf lf

Unit Cost $14.50 $14.50 $14.50 $5.35 $5.35 $5.45 $16.00 $15.00

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total Alternate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

$0.00

J'Ouvert Caribbean Restaurant JC-1 03300 Concrete

Description 4" MIN. 100 SF OR LESS 5" MIN. 100 SF OR LESS 6" MIN. 100 SF OR LESS 4" 100 TO 500 SF 5" 100 TO 500 SF 6" 100 TO 500 SF 4" 500 TO 1,000 SF 5" 500 TO 1,000 SF 6" 500 TO 1,000 SF 4" 1,000 & UP 5" 1,000 & UP 6" 1,000 & UP 12" BY 12" BEAM 12" BY 24" BEAM 12" BY 30" BEAM 12" BY 36" BEAM 12" BY 8' TO 10 PEAR 14" BY 8' TO 10' PEAR

TOTALS

Margin =

Units Quantity Min. Min. Min. sf sf sf sf sf sf sf sf sf lf lf lf lf ea ea

0.00%

Unit Cost Subtotal Margin 650 0.00 0 650 0.00 0 650 0.00 0 10.5 0.00 0 10.5 0.00 0 11.5 0.00 0 5.5 0.00 0 5.5 0.00 0 5.6 0.00 0 5.25 0.00 0 5.25 0.00 0 5.4 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 225 0.00 0 300 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

J'Ouvert Caribbean Restaurant JC-1 04200 Masonry

Description BRICK REPAIR MIN BLOCK REPAIR MIN STD BRICK 500 OR LESS STD BRICK 1,000 OR LESS STD BRICK 5,000 OR LESS STD BRICK 10,000 UP BLOCK 500 OR LESS BLOCK 1000 OR LESS BLOCK 1000 UP

TOTALS

Margin =

Units Min Min

per 1000 per 1000 ea ea ea

Quantity

0.00%

Unit Cost Subtotal Margin 500 0.00 0 500 0.00 0 0.00 0 950 0.00 0 770 0.00 0 680 0.00 0 14 0.00 0 12 0.00 0 10.5 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total Alternates $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

$0.00

J'Ouvert Caribbean Restaurant JC-1 05120 Metals

Description

TOTALS

Margin =

Units

Quantity

Unit Cost

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

J'Ouvert Caribbean Restaurant JC-1

06220 Millwork Description ADA VANITY LOWER ADA CABINETS UPPER CABINETS COUNTER TOP 24"DEEP COUNTER TOP 30" DEEP OPEN SHELVING OPEN SHELVING PASS/THROUGH SHELF STANDARD CHAIR RAIL STANDARD CROWN MOLD

Margin = 0.00% Unit Units Quantity Cost ea 150 lf 150 lf 110 lf 85 lf 95 lf 75 lf 65 lf 110 lf 6.5 lf 6.9 1 50 1 500

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 50.00 0 500.00 0 0.00 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50.00 $500.00 $0.00

Contractor to provide & install millwork for (Front cashier station & Prep area in the kitchen)… Contractor is to use a "Poly-Plastic" top for the prep area in the kitchen. (Approx 12')

TOTALS

550.00

0.00

$550.00

SINGLE W / PANEL DRAWERS & DOORS DOOR & ADJUSTABLE SHELVING OPEN BELOW COUNTER OPEN BELOW COUNTER PLASITC LAMINATE COVERED PAINT GRADE LAMINATE TOP /FOR BYPASS WINDOW PAINT GRADE PAINT GRADE

J'Ouvert Caribbean Restaurant JC-1 07200 Insulation

Margin = 0.00%

Description 2 1/2" BATT BY 16" 2 1/2" BATT BY 24" 3 1/2" BATT BY 16" 3 1/2" BATT BY 24" 6" BATT BY 16" 6" BATT BY 24" 4" 2' BY 4' 6" 2' BY 4' 1 1/2" VINYL CLAD 2" VINYL CLAD

Units Quantity sf sf sf sf 0 sf sf sf sf sf sf 0 MATERIALS

Unit Cost 0.22 0.22 0.25 0.25 0.38 0.38 0.25 0.38 0.95 1.50 1.00

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

WALL ROLL WALL ROLL WALL ROLL WALL ROLL WALL ROLL WALL ROLL LAY IN CEILING LAY IN CEILING DECK INSULATION DECK INSULATION

Tenant is furnishing installation…

TOTALS

0.00

0.00

$0.00

$0.00

J'Ouvert Caribbean Restaurant JC-1

07300 Roofing

Margin =

Description ROOF REPAIR MIN SET ROOF JACK HVAC CRUB MIN. HVAC CRUB THREE PLY/GRAVEL MDF / SEAMLESS

Units Min ea ea ea sf bid

Quantity

1

Unit Cost 350 350 450 450 1.85

1000.00

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 1000.00 0 0.00 0 0.00 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 $0.00 $0.00

Contractor to install "exhaust Hood" vent system for the gas stove/ grille…

TOTALS

1000.00

0.00

$1,000.00

Alternates

J'Ouvert Caribbean Restaurant JC-1 08120 Doors & Frames Description 2'0"x 6'8" PL DOOR 2'8"x 6'8" PL DOOR 3'0"x 6'8" PL DOOR 3'6"x 6'8" PL DOOR 2'0"x 7'0" PL DOOR 2'8"x 7'0" PL DOOR 3'0"x 7'0" PL DOOR 3'6"x 7'0" PL DOOR 2'0"X 8'0" PL DOOR 2'8"X 8'0" PL DOOR 3'0"X 8'0" PL DOOR 3'6"X 8'0" PL DOOR 2'0"X 9'0" PL DOOR 2'8"X 9'0" PL DOOR 3'0"X 9'0" PL DOOR 3'6"X 9'0" PL DOOR MORTIS PREP. ADJ DOOR FRAME ADD 3'0"x 7'0" PL DOOR "B" 3'6"x 7'0" PL DOOR 3'0"X 8'0" PL DOOR "B" 3'6"X 8'0" PL DOOR 3'0"X 9'0" PL DOOR "B" 3'6"X 9'0" PL DOOR 3'0" X'7'0" HL METAL 3'6" x 7'0" HL METAL

TOTALS

Margin =

Units Quantity ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea

Unit Cost 342 342 352 352 353 353 363 388 368 368 368 393 393 393 393 434 10 25 808 868 813 878 828 928 377 439

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB SD PREP.DR,AL375FM,HGS & LB ADD TO DOOR COST ADD TO DOOR COST 90 MIN. FIRE RATING,DR,FM,HG & LB 90 MIN. FIRE RATING,DR,FM,HG & LB 90 MIN. FIRE RATING,DR,FM,HG & LB 90 MIN. FIRE RATING,DR,FM,HG & LB 90 MIN. FIRE RATING,DR,FM,HG & LB 90 MIN. FIRE RATING,DR,FM,HG & LB 6'8" & 7'0" / DR ,FM, HGS,LB 6'8" & 7'0" / DR ,FM, HGS,LB

0

J'Ouvert Caribbean Restaurant JC-1 08300 Special Doors

Description OVERHEAD DOORS 8' X 8' SECTIONAL 8' X 10' 10' X 10' 10' X 12' 10' X 14' 12' X 10' 12' X 12' 12' X 14' ROLL STEEL DOORS 8' X 8' 8' X 10' 10' X 8' 10' X 10' 10' X 12' 12' X 8' 12' X 10' 12' X 12' Door Maintenace

TOTALS

Margin =

Units Quantity ea 0 ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea

Unit Cost 0.00

225

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

J'Ouvert Caribbean Restaurant JC-1 08700 Hardware

Description

Margin =

Units Quantity

Unit Cost

STANDARD KNOB

ENTRANCE LOCK PRIVACY PASSAGE

ea ea ea

75 65 60

ea ea ea

75 65 60

ea ea ea

215 200 190

ea ea ea

200 150 120

ea ea ea

235 176 152

ENTRANCE LOCK PRIVACY PASSAGE

ea ea ea

312 262 221

STANDARD ADA

ea ea

105 120

ea ea

5.5 5.5

LEVER HANDLE

ENTRANCE LOCK PRIVACY PASSAGE MORTISE KNOB

ENTRANCE LOCK PRIVACY PASSAGE MORTISE LEVER

ENTRANCE LOCK PRIVACY PASSAGE BEST LOCK

ENTRANCE LOCK PRIVACY PASSAGE BEST MORTISE

CLOSER

DOOR STOPS

FLOOR STOP WALL CUP STOP

TOTALS

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY MATERIAL ONLY

$0.00

J'Ouvert Caribbean Restaurant JC-1 09250 Drywall

Margin = Unit Units Quantity Cost sf 2.85 sf sf sf 3.06 sf sf sf 3.11 sf sf sf 3.15 sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf sf 1 6800

Description 2 1/2" METAL STUD 26 G

35/8" METAL STUDS 26 G

4" METAL STUD 26 G

6" METAL STUDS 26 G

3 5/8" METAL STUDS 20 G

4" METAL STUD 20 G

6" METAL STUDS 20 G

3 5/8" METAL STUDS 18 G

4" METAL STUD 18 G

6" METAL STUDS 18 G

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 6800.00 0 0.00 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,800.00 $0.00

Contractor to install all drywall & framing outlining the restroom & kitchen & all exterior walls (Price includes installed insulation, tape/ float & sanded)… (Price includes hanging restroom door & office door plus all hardware)… NO PAINT: Tenant will paint the space!

TOTALS

6800.00

0.00

$6,800.00

Alternate STUDS $ 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12' 9' & 10' TALL 12' TALL ABOVE 12'

J'Ouvert Caribbean Restaurant JC-1

08810 Glass

Description SERVICE CALL AFTER HOURS CALL STANDARD STORE FRONT 3'0"X 8'0' 1/4" CLEAR 3'0"X 8'0' 1/4" CLEAR 3/8" CLEAR BUTT JOINT 1/4" MIRROR 3'0"X 7'0" GLASS DOOR

TOTALS

Margin =

Units ea ea sf sf sf sf sf ea

Quantity

Unit Cost 75 225 18.5 12 14 26 16 1070

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternate

$0.00

J'Ouvert Caribbean Restaurant

JC-1

09510 Acoustical Ceiling

Description 2' X 4' STANDARD : 9'-10' 2' X 4' STANDARD : 11'-12' 2' X 4' STANDARD : 12'-16' 2' X 4' FIRE RATED : 9'-10' 2' X 4' FIRE RATED : 11'-12' 2' X 4' FIRE RATED : 12'-16' 2' X 2' STANDARD : 9'-10' 2' X 2' STANDARD : 11'-12' 2' X 2' STANDARD : 12'-16' 2' X 2' FIRE RATED : 9'-10' 2' X 2' FIRE RATED : 11'-12' 2' X 2' FIRE RATED : 12'-16'

Margin =

Units Quantity sf 442 sf sf sf sf sf sf sf sf sf sf sf

Unit Cost 1.55 1.2 1.3 1.45 1.55 1.55 1.1 1.2 1.3 1.45 1.55 1.55

0.00%

Subtotal Margin 685.10 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0

11/7/2009

Total $685.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Alternates

Contractor to install "Acoustical Ceiling & Grid" in restroom & kitchen/ office area. Approx (442 SF)… (Tenant is supplying materials)

TOTALS

685.10

0.00

$685.10

0

J'Ouvert Caribbean Restaurant JC-1 09550 Wood Flooring

Description 2 1/2" RED OAK PLANK 2 1/2" WHITE OAK PLANK 12" X 12" OAK PARQUETT 2 1/2" RED OAK PLANK 2 1/2" WHITE OAK PLANK 12" X 12" OAK PARQUETT

TOTALS

Margin =

Units Quantity sf sf sf sf sf sf

0.00%

Unit Cost Subtotal Margin 5.8 0.00 0 5.5 0.00 0 5 0.00 0 6 0.00 0 6 0.00 0 4.75 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

J'Ouvert Caribbean Restaurant JC-1 09650 VCT & Base

Margin =

Description 12" X 12" COMMERCIAL 12" X 12" COMMERCIAL 12" X 12" COMMERCIAL SHEETVINYL SHEETVINYL SHEETVINYL 2 1/2" VINYL NO TOE 2 1/2" VINYL W / TOE 2 1/2" RUBBER NO TOE 2 1/2" RUBBER W / TOE 4" VINYL NO TOE 4" VINYL W / TOE 4" RUBBER NO TOE 4" RUBBER W / TOE 6" VINYL NO TOE 6" VINYL W / TOE 6" RUBBER NO TOE 6" RUBBER W / TOE

Units Quantity sf sf sf yd yd yd lf lf 0 lf lf lf lf lf lf 0 lf lf lf lf

0.00%

Unit Cost Subtotal Margin 1.25 0.00 0 1.55 0.00 0 4.6 0.00 0 22 0.00 0 30 0.00 0 38 0.00 0 0.85 0.00 0 0.85 0.00 0 0.97 0.00 0 0.97 0.00 0 0.98 0.00 0 0.98 0.00 0 1.1 0.00 0 1.75 0.00 0 1.45 0.00 0 1.45 0.00 0 1.65 0.00 0 1.66 0.00 0 0.00 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Alternates STANDARD NON-SLIP STATIC DISAPATED STANDARD SOLID VINYL C SOLID VINYL IND MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF MIN. 120 LF

Alternate - (Labor Only) Install Basse Board throughout the restaurant… (Recommended)

TOTALS

0.00

0.00

$0.00

0

J'Ouvert Caribbean Restaurant JC-1 09680 Carpet

Description LEVEL LOOP NILON - 26 oz LEVEL LOOP OLIFION - 26 oz CUT PILE NILON - 26 oz CUT PILE OLIFION - 26 oz

LEVEL LOOP NILON - 28 oz LEVEL LOOP OLIFION - 28 oz CUT PILE NILON - 28 oz CUT PILE OLIFION - 28 oz CUT PILE NILON - 28 oz w/ pad CUT PILE OLIFION - 28 oz w/ pad LEVEL LOOP NILON - 30 oz LEVEL LOOP OLIFION - 30 oz CUT PILE NILON - 30 oz CUT PILE OLIFION - 30 oz CUT PILE NILON - 30 oz w/ pad CUT PILE OLIFION - 30 oz w/ pad

TOTALS

Margin =

Units Quantity yard 0 yard yard yard yard yard yard yard yard yard yard yard yard yard yard yard yard yard

Unit Cost 10.25 7.50 9

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternate

Coleman Contracting Group Inc.

J'Ouvert Caribbean Restauran

09900 Paint

Margin =

Description

Units Quantity

MINIMUM MINIMUM LATEX LATEX ENAMEL ENAMEL 3'0"X 7'0" DOOR & FRAME 10'X 10' OVERHEAD DOOR

ls ls sf sf sf sf ea ea

NEW CONCRETE/BLOCK NEW CONCRETE/BLOCK EX. CONCRETE/BLOCK EX.NEW CONC./BLOCK NEW DRYWALL NEW DRYWALL NEW DRYWALL NEW DRYWALL 3'0" X 9'0" NEW DOOR & FRAME 3'0" X 9'0" EXT.DOOR & FRAME MILLWORK

sf sf sf sf sf sf sf sf ea ea sf

Unit Cost

Exterior 150 0.29 0.34 0.4 0.35 35 75

Interior 1265

0.35 0.4 0.4 0.45 0.3 0.4 0.35 0.45 25 25 0.35

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 506.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Contractor to install floor paint throughout space… (Kitchen: Clear non-slip gloss, Customer Area: Flat Black non-slip gloss). (Tenant is

TOTALS

506.00

0.00

bbean Restaurant JC-1 11/7/2009

Total Alternates $0.00 $0.00 NEW 12' & UNDER $0.00 EXISTING 12' TO 24' $0.00 NEW 12' & UNDER $0.00 EXISTING 12' TO 24' $0.00 NEW 12' & UNDER $0.00 EXISTING 12' TO 24' $0.00 EACH SIDE $0.00 $0.00 $0.00 12' & UNDER $506.00 12' TO 24' $0.00 12' & UNDER $0.00 12' TO 24' $0.00 12' & UNDER/ VACANT $0.00 12' TO 24' VACANT $0.00 12' & UNDER/ OCCUP. $0.00 12' TO 24' / OCCUP. $0.00 EACH SIDE $0.00 EACH SIDE $0.00 $0.00

ack non-slip gloss). (Tenant is supplying materials)

$506.00

$-

J'Ouvert Caribbean Restaurant JC-1

09950 Wallcovering

Description MINIMUM (??? SF) Vinyl Wallcovering Fabric Wallcovering

TOTALS

Margin =

Units Quantity ls sf sf

Unit Cost 1.50 3

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

$0.00

Coleman Contracting Group Inc.

J'Ouvert Caribbean Restaurant

JC-1

10800 Toilet Partitions & Hardware

Description Standard Stall - Plam Handicap Stall - Plam Urinal Partition - Plam Standard Stall - Metal Handicap Stall - Metal Urinal Partition - Metal Standard Stall Handicap Stall Urinal Partition Standard Stall Handicap Stall Urinal Partition Standard Stall Handicap Stall Urinal Partition Paper Towel Dispenser Toilet Tissue Diapenser Soap Dispenser Feminine Napkin Dispenser Feminine Napkin Disposal 36" Grab Bars 42" Grab Bars Hand Dryer Standard Toilet Signage

Margin =

Units ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea

Quantity

0

1

Unit Cost 650 750 200 640 800 175

52 15 28 56 28 55 55 146 7.5 150

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150.00

Contractor to install restroom accessories: (36" grab bar, 42" grab bar, mirror, tissue dispenser, paper towel dispenser & soap dispenser)

TOTALS

150.00

0.00

$150.00

Coleman Contracting Group Inc.

J'Ouvert Caribbean Restaurant JC-1

10000 Specialties

Description

Margin =

Units

Quantity

Unit Cost

1265

0

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Alternate: Contractor to clean & Spray on black paint at the ceiling to make it have a clean finish!

TOTALS

0.00

0.00

$0.00

J'Ouvert Caribbean Restaurant

JC-1

11452 Appliances

Description Refrigerator Icemaker Dishwasher Microwave Commercial Stove

TOTALS

Margin = 0.00%

Units Quantity ea ea ea ea ea

Unit Cost 1200 950 850 350 1100

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total Alternates $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

$0.00

J'Ouvert Caribbean Restaurant JC-1 12510 Window Coverings

Description Repair Miniblinds New Miniblinds (<5) New Miniblinds (<10) New Miniblinds (>10) New Curtains

TOTALS

Margin = Unit Units Quantity Cost ea 5 ea 85 ea 75 ea 60 lf 25

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

$0.00

J'Ouvert Caribbean Restaurant JC-1

15300 Fire Protection

Description Demolition Service Trip Minimum Only a few walls moved 1/2 of walls moved most of walls moved

TOTALS

Margin =

Units ls sf sf sf

Quantity

Unit Cost 0 300 0.50 0.75 1.00

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternate

$0.00

Coleman Contracting Group Inc.

J'Ouvert Caribbean Restaurant JC-1

15400 Plumbing

Description New Restroom ADA Lavatory Replace Lavatory with ADA New 2 Compartment Lavatory Hook Up Appliances (10') Replace Water Closet New Water Closet Replace Urinal New Urinal New ADA Drinking Fountain

Margin =

Units ea ea ea ea ea ea ea ea ea

Quantity

Unit Cost

1

6500

Subtotal 0.00 0.00 6500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total $0.00 $0.00 $6,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Contractor to provide & install all the proper plumbing (including restroom fixtures) for this space… (Includes: restroom, 1 hand sink, 3 compartment sink, floor drain in kitchen & 1 mop sink)… ( This re

TOTALS

6500.00

0.00

$6,500.00

Coleman Contracting Group Inc.

J'Ouvert Caribbean Restaurant JC-1

15500 HVAC

Description Relocated Supply Grills New Supply Grills Relocated Return Grills New Return Grills New Ductwork Demo Ductwork Relocate Flexduct 5' Relocate Thermostat New Thermostat New 3 Ton Unit New 4 Ton Unit New 5 Ton Unit New 6 Ton Unit New 7 Ton Unit New 8 Ton Unit New 9 Ton Unit New 10 Ton Unit

Margin =

Units ea ea ea ea lf lf ea ea ea Unit Unit Unit Unit Unit Unit Unit Unit

Quantity

Unit Cost 25.00 220.00 250

65 110

0

6250

1

6000

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6000.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,000.00 $0.00 $0.00 $0.00

Contractor to provide & install all necessary HVAC (including material) in the space.

TOTALS

6000.00

0.00

$6,000.00

J'Ouvert Caribbean Restaurant JC-1 16000 Electrical

Description Relocate Outlet New Outlet 75' New Outlet 150' New Dedicated Outlet 75' New Dedicated Outlet 150' New Phone Outlet With String Relocated Exit Sign New Exit Sign Relocated Switch New Switch New Two Way Switch New Three Way Switch Relocated 2x4 Fixture New 2x4 Fixture Relocated Downlight New Downlight Relocated Strip Fixture New Strip Fixture Relocated High Bay Fixture New High Bay Fixture Bulb Replacement Ballast Repair New Circuit New Panel HVAC Disconnect

Margin =

Units Quantity ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea 1 ea ea ea ea ea

0 0 0 0

Unit Cost 45

215 25 25 65 110 45 65 85 120 45 120 45 85 45 80 12,000 2.5 65 85 650

0.00%

Subtotal Margin 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 12000.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0

11/7/2009

Total Alternates $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $12,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Contractor to provide & install all necessary elec (including material & light fixtures) throughout the space.

TOTALS

12000.00

0.00

$12,000.00

$0.00

J'Ouvert Caribbean Restaurant JC-1 16150 Fire Alarm

Description Relocated Strobe New Strobe Relocated Smoke Detector New Smoke Detector Electric Door Lock Hook Up New Service box

TOTALS

Margin =

Units ea ea ea ea ea ea

Quantity

Unit Cost 175 350 150 350 250 180

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00%

Margin 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00

11/7/2009

Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

Alternates

Related Documents

New Bid
June 2020 9
Bid
October 2019 25
Paco Bid
November 2019 23
Bid Ah
July 2020 17
Sphion Bid
June 2020 12