Radiogram No. 4963u
Form 24 for 03/30/07
SM Aft and -Y FGB (2 Strings) Kurs Hardware Test. CREW OFF DUTY GMT
CREW
ACTIVITY
19:00-19:10
Morning inspection
19:10-19:40
Post-sleep
19:40-20:30
BREAKFAST
20:35-20:50
FE-1
Liquid Unit БЖ #056 (Elektron-VM) pressure monitoring
20:45-21:00
CDR
IWIS deactivation
21:40-22:00
Flight Director / ISS Crew Tagup (S-band)
22:20-23:50
FE-2
Physical Exercise (CEVIS)
22:20-23:50
FE-1
Physical Exercise (TVIS), day 1
22:50-23:50
CDR
Physical Exercise (RED)
23:50-00:50
LUNCH
00:50-00:55
CDR
Payload status check
00:50-01:00
FE-1
PLANTS-2. Photography
00:50-01:05
FE-2
Food frequency questionnaire
00:55-01:00
CDR
OCA SSC router reboot
01:00-01:05
CDR
SSC file server reboot
01:00-01:15
FE-1
Taking readings from АОК ГАНК-4М gas analyzer
01:05-01:20
CDR
Food frequency questionnaire
01:05-01:25
FE-2
PCS relocation
01:20-01:30
CDR
O2 level check
01:25-01:35
FE-2
US hardware transfer on USOS
01:40-02:20
FE-1
Activation of Elektron-VM, temperature check on Liquid Unit after activation. Tagup (S-band)
01:55-03:25
CDR
Physical Exercise (TVIS + CEVIS)
02:20-03:00
FE-1
Filling EDV [KOB] for Elektron
02:30-03:30
FE-2
Physical Exercise (RED)
03:00-03:30
FE-1
СОЖ Maintenance
03:25-03:30
CDR
Transfer TVIS/RED/CEVIS/HRM data to MEC
03:30-04:00
DINNER
04:00-04:30
Daily Food Prep
04:30-05:30
Pre-sleep
05:30-15:30
SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check
Task List
FE-1
URAGAN. Observation and photography
RASTENIYA-2. Status check Note: See OSTP for references to US activities. End of Radiogram