Radiogram No. 4963u

Form 24 for 03/30/07

SM Aft and -Y FGB (2 Strings) Kurs Hardware Test. CREW OFF DUTY GMT

CREW

ACTIVITY

19:00-19:10

Morning inspection

19:10-19:40

Post-sleep

19:40-20:30

BREAKFAST

20:35-20:50

FE-1

Liquid Unit БЖ #056 (Elektron-VM) pressure monitoring

20:45-21:00

CDR

IWIS deactivation

21:40-22:00

Flight Director / ISS Crew Tagup (S-band)

22:20-23:50

FE-2

Physical Exercise (CEVIS)

22:20-23:50

FE-1

Physical Exercise (TVIS), day 1

22:50-23:50

CDR

Physical Exercise (RED)

23:50-00:50

LUNCH

00:50-00:55

CDR

Payload status check

00:50-01:00

FE-1

PLANTS-2. Photography

00:50-01:05

FE-2

Food frequency questionnaire

00:55-01:00

CDR

OCA SSC router reboot

01:00-01:05

CDR

SSC file server reboot

01:00-01:15

FE-1

Taking readings from АОК ГАНК-4М gas analyzer

01:05-01:20

CDR

Food frequency questionnaire

01:05-01:25

FE-2

PCS relocation

01:20-01:30

CDR

O2 level check

01:25-01:35

FE-2

US hardware transfer on USOS

01:40-02:20

FE-1

Activation of Elektron-VM, temperature check on Liquid Unit after activation. Tagup (S-band)

01:55-03:25

CDR

Physical Exercise (TVIS + CEVIS)

02:20-03:00

FE-1

Filling EDV [KOB] for Elektron

02:30-03:30

FE-2

Physical Exercise (RED)

03:00-03:30

FE-1

СОЖ Maintenance

03:25-03:30

CDR

Transfer TVIS/RED/CEVIS/HRM data to MEC

03:30-04:00

DINNER

04:00-04:30

Daily Food Prep

04:30-05:30

Pre-sleep

05:30-15:30

SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check

Task List

FE-1

URAGAN. Observation and photography

RASTENIYA-2. Status check Note: See OSTP for references to US activities. End of Radiogram