Nasa 168216main 01 30 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 168216main 01 30 2007 Tl as PDF for free.

More details

  • Words: 322
  • Pages: 2
Radiogram No. 4611u Form 24 for 01/30/07 CREW HALF-DUTY. TESTING АСН-М [SATELLITE NAVIGATION SYSTEM - M] HARDWARE GMT

CREW

10:00-10:10 10:10-10:40 FE-1 10:10-10:25 FE-2 10:10-10:25 CDR 10:25-10:40 FE-2 10:25-10:55 CDR 10:40-10:55 FE-2 10:40-11:30 FE-1 10:55-11:45 CDR, FE-2

ACTIVITY Morning Inspection Post-sleep Biochemical urine test Post-sleep BREAKFAST

12:30-14:30 FE-1

Progress 358 Rodnik Water Tank 2 [БВ2] bladder compression

14:00-14:15 FE-2

Pre-EVA Private Medical Conference (Ku + S-band)

14:00-14:05 CDR

Atmosphere Revitalization Rack Activation (CDRA)

14:15-14:30 CDR

EVA procedure printout

14:30-16:00 CDR

Physical Exercise (CEVIS)

14:30-16:00 FE-1

Physical Exercise (TVIS), day 3

14:35-15:00 FE-2

IWIS installation

15:00-16:00 FE-2

Physical Exercise (RED)

16:00-17:00 .

LUNCH

17:00-17:45 CDR, FE-2 Equipment Lock config 17:00-17:30 FE-1

СОЖ maintenance

17:30-17:40 FE-1

Replacing ИК0501 ГА СО2 Gas Analyzer Filter Unit (Install #092, 00038918R ФГБ_210_1. Stow removed unit for return in ЗИП ГА. Update the IMS)

17:45-18:30

EVA tagup with MCC (S-band)

18:30-18:45 CDR

SSC config

19:25-19:35 FE-2

TVIS weekly Maintenance

19:05-20:05 FE-1

Physical Exercise (VELO + RED) day 3

19:30-19:45 CDR

Pre-EVA Private Medical Conference (Ku + S-band)

19:35-21:05 FE-2

Physical Exercise (TVIS)

19:45-19:50 CDR

PCS laptop power up in A/L

19:55-20:00 CDR

Connect DCP power cable

20:00-20:05 CDR

HAM radio powerdown in FGB

20:05-21:05 CDR

Physical Exercise (RED)

20:10-20:30 FE-1

IMS update

20:30-20:45 FE-1

Private Medical Conference (Ku + S-band)

21:05-21:10 CDR

Transfer TVIS/RED/CEVIS/HRM data to MEC

21:05-21:10 FE-2

Payload status check /

21:10-21:25

Evening work prep

21:25-21:40

Daily Planning Conference (S-band)

21:40-22:25

Evening work prep

22:25-22:55 CDR, FE-2 Daily food prep 22:30-22:45 FE-1 22:45-23:20 FE-1 22:55-23:25 CDR, FE-2 23:20-23:55 FE-1

PILLE dosimeter preparation for EVA DINNER Daily food prep

23:25-23:55 CDR,FE-2 Pre-sleep 23:55-01:00 CDR, FE-2 23:55-00:40 FE-1 00:40-01:30 FE-1 01:00-01:30 CDR, FE-2 01:30-10:00

Start pre-breathe Pre-sleep SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check

Task List

FE-1

Fan ВПрК replacement (Retrieve new one from bag II-1/255-2 ФГБ_430_1, leaving 9902158 (b/c 003338R); discard the removed unit. Update the IMS.) Note: See OSTP for references to US activities. End of Radiogram

Related Documents