M.plan For S.entry Sheet Ecc6

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View M.plan For S.entry Sheet Ecc6 as PDF for free.

More details

  • Words: 1,241
  • Pages: 7
Integration Test Plan Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

BUSINESS PROCESS STEPS

Module - Plant Maintenance Maintenance Cycle

TRANS. CODE

INPUT DATA

1

Preliminary setting in configuration for Maintenance plan for service requirement.: define maintenance plan category service requirement(service entry sheet)

SPRO>PM&CS>Maint.pl ans,workcenter,tasklist,& PRT>Mant.Plans>define maintenance plan category.

2

Preliminary setting in configuration for Maintenance plan for service requirement.

SPRO>PM&CS>Maint.pl ans,workcenter,tasklist,& PRT>Mant.Plans>define maintenance plan number range.

Create master service

Transaction no: AC01

3

Patch/ Reference

OUTPUT DATA / RESULT

Maint.Plan.cat:MM Name: service procurement Call object: Service entry sheet. Ref.Object:0140 External number range assignment :02 Internal number range assignment : 01 Select groups:MM Define inmterval, include the group in the interval defined.

SAP Doc Reference/

DATA ACCEPTED,.

Maintenan OK ce plan category MM created.

DATA ACCEPTED

Number OK range for maintenan ce plan category is defined.. OK

,

Activity Number: 3000111 DATA ACCEPTED Descritption: Pnuematic , service created. valve servicing. Service category: Servicepurchase. Base unit of measure: AU Basic data: Material/service group: 01 Valuation class: 3200 STD.SER.CAT: Edition :0 Internal Work: Conversion: 0 AU<=>0

OK / Error (support by Screen Shots)

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Integration Test Plan

Module - Plant Maintenance Maintenance Cycle

Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

1

2

3

BUSINESS PROCESS STEPS

Create Maintenance order for external service:

Release the order 50000121

Create service purchase order

TRANS. CODE

INPUT DATA

Transaction no: IW 31

IW32

Transaction no:ME21N

Patch/ Reference

OUTPUT DATA / RESULT

Order type: PM02 Equipment: ACFLMC-004. Planning plant: 1000 Business area:1000 ,in operation tab enter text for first operation, select control key PM03 and select external detail screen for the operation. Material group:01 Purchase group:004 Plant: 1000 Requisitioned: kiran Select service: 3000111 Quantity: 4 Unit: AU Gross price: 1000 Cost element: 7100601 Order:50000121 Select the button PUT the order in process. Save the order. Pur.oraganisation:1000 Purchase group:004 Company code:1000 Vendor:0000100012

Maintenance order :50000121created.

SAP Doc Reference/

OK / Error (support by Screen Shots)

OK

Purchase requisition: 10000083 Created.

Order 50000121 saved. Purchase Requistion:100000 83 is created. Service PO:4500000078 is created.

OK

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Integration Test Plan

Module - Plant Maintenance Maintenance Cycle

Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

4

BUSINESS PROCESS STEPS

Create characteristics

5 Create measuring point:

TRANS. CODE

INPUT DATA

OUTPUT DATA / RESULT

Your ref: kk Our ref: kiran Sales person:service Telephone:12345 GR message is selected. Payment terms: 001 Pur. Requisition no:10001281 SRV. Based IV is selected. Tax code: V0 Check and save. Name: OP-HR. Description: operating hours; Data type: Numeric format. Number of characters: 3 Decimal Places: 1 Value assignment: Single Value Unit of measure: hrs. Equipment: ACFLMC-004 Measuring position: operating Hours Decimal places:1 Description: operating hours Characteristics: OP-HR Measuring point is counter selected. Counter over reading:

CT04

IE02

Patch/ Reference

SAP Doc Reference/

Data Accepted. Characteristics OP-HR created.

OK

DATA accepted. Measuring point 23 is created for the equipment ACFLMC-004

OK

OK / Error (support by Screen Shots)

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Integration Test Plan

Module - Plant Maintenance Maintenance Cycle

Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

BUSINESS PROCESS STEPS

TRANS. CODE

Create Initial Measuring document

3

Create Preventive Maintenance Transaction no: IP41 - Single cycle plan(performance based) for service procurement

Create second Measuring document

OUTPUT DATA / RESULT

SAP Doc Reference/

DATA accepted. Measuring document 43 is created.

OK

Maintenance plan 21 is created.

OK

DATA accepted. Measuring document 44 is created.

OK

9999 Annual estimate: 3650 Measuring point no:23 Reading of the counter:0

6

4

INPUT DATA

IK11

IK11

Patch/ Reference

Maintenance plan category: Service procurement

OK / Error (support by Screen Shots)

Description: Maint.p[lan for service procurement. Cycle: 10 hrs. Counter:23 Purchase order:4500000078 Item no:0010 Settlement order:50000121 Cal horizon: 100% Scheduling period: 12Months Start of counter reading: 0hr. Measuring point no:23 Reading of the counter:10

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Integration Test Plan Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

BUSINESS PROCESS STEPS

Module - Plant Maintenance Maintenance Cycle

TRANS. CODE

INPUT DATA

Patch/ Reference

OUTPUT DATA / RESULT

5 Schedule the Maintenance Plan

Transaction no:IP10

Maintenance plan: 21 Start of the counter reading:0 Save the maintenance plan.

5

Accept the first service entry sheet: 1000000210

Transaction no: ML81N

PO no: 45000000078 Select services: 3000021 Qty:1 Accept entry sheet and save.

6

Create manual service entry sheet

Transaction no: ML81N

PO no: 45000000078 Select services: 3000021 Qty:1 Accept entry sheet and save.

7

Accept the manual service entry sheet: 1000000213

Transaction no: ML81N

PO no: 45000000078 Select services: 3000021 Qty:1 Accept entry sheet and save.

SAP Doc Reference/

Maintenance call Service entry sheet: 1000000210for PO: 4500000078 is generated. Call Date of the first call:17-04-2007

OK

Service entry sheet accepted, doc. Posted:

OK.

Manual Service entry sheet: 1000000213 for PO: 4500000078 is generated. Service entry sheet accepted, doc. Posted:

OK / Error (support by Screen Shots)

OK

OK.

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Integration Test Plan

Module - Plant Maintenance Maintenance Cycle

Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

8

BUSINESS PROCESS STEPS

Create final Measuring document

9 Schedule Final call for maintenance plan: 21

TRANS. CODE

INPUT DATA

Patch/ Reference

OUTPUT DATA / RESULT

SAP Doc Reference/

IK11

Measuring point no:23 Reading of the counter:20

DATA accepted. Measuring document 51 is created.

OK

Transaction no:IP10

Select the third call release it and save the maintenance plan.

OK

Transaction no: ML81N

PO no: 45000000078 Select services: 3000021 Qty:2 Set final entry Accept entry sheet and save.

Maintenance call Service entry sheet:1000000214 for PO:4500000078 is generated. Service entry sheet accepted, doc. 5000000157 Posted.

Order:50000121 Select technically complete the order. Order:50000121 Period:1 Year:2007 Test run not selected.

Order status TECO is displayed.

OK

Actual cost in the order is zero

OK

10

Accept the final service entry sheet: 1000000214

11

Technically complete the order

Transaction no: IW32

12

Actual settlement of the actual cost

Transaction no: KO88

OK / Error (support by Screen Shots)

OK

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Integration Test Plan Test Scenario :Create Maintenance plan – Service entry and schedule the plan and manual service entry sheet also included . No

BUSINESS PROCESS STEPS

13

Post invoice

Module - Plant Maintenance Maintenance Cycle

TRANS. CODE

INPUT DATA

Transaction no:MIRO

InvoiceDate:25.04.2007 Posting Date:25.04.2007

Patch/ Reference

OUTPUT DATA / RESULT

SAP Doc Reference/

Ionvoice posted doc: is posted.

OK

Order saved.

OK

Completion of the order is done. Order no:50000121

OK

OK / Error (support by Screen Shots)

Amount:4000/Pono:4500000078 Select Booking OK Save the invoice. 14

Set the final invoice indicator in PO

Transaction no: ME22N

15

Complete business the order

Transaction no:IW 32

PO:4500000078 Select the final invoice indictor. Order no: 50000121 Select complete the business.

Comments : Tested By K.Kiran Kumar

Test Date 17/04/2007

Approved By

Approved Date

Related Documents

Ecc6
April 2020 10
Ef Comp+product+mplan
November 2019 4
Configurable Task List Ecc6
November 2019 12
Fleet Equipment Ecc6
November 2019 13
Order Settlement Ecc6
November 2019 5