Project Status: New Project Type/Scale: New Unit Industry: Electricity generation Investment/Estimated Cost: Rs. 2,475.00 Crores / USD 618.75 Million Tuesday, June 26, 2007
Date of announcement
More projects (By Tamil Nadu Electricity Board): • Alamathy Substation • Kayathar-Sankaneri Transmission Line • Kondiyan Kuppam SubStation • Lower Bhavani Hydel Power • Marungur Sub-Station • Oragadam Sub-Station • Pykara Hydel Power
• Bhavani Kattalai Barrage I • Gummidipoondi Sipcot Hydel Power Sub-Station • Kollimalai Hydel Power • Komangalam Sub-Station • Kovilkalappal Power
• Kuttalam Power
• M Parur Sub-Station • • •
• Sriperumpudur Sipcot • Sub-Station • Thiruverkadu Sub-Statiion • • Umangalam Sub-Station
•
• Veerapuram Sub-Station • Athipalli(Gudalur) Upgradation Of Ss • Jaggasamudiram SubStation • Kaduvettipalayam-Cbe Ss • Karuvalur-Cbe Ss
• •
• Manapalayam SubStation Melakottaiyur Substation • Neduncherry Sub-Station Perunkulam (Valuthur) • Pinnathur Sub-Station Power Rajendra Pattinam Subs- • Sathnur Hydel Power Station Tatabad-Peelamedu • Thirumurthy Hydel Power Transmission Thozhudur Sub-Station • Trichy-Podukkottai Transmission Line Uraiyur Sub-Station • Valuthur Gas Based Power Achipatty-Cbe Ss • Anaimalai-Cbe Ss Bommidi Power-Station • Cherambadi-Nilgiris Ss
• Kadathur Power-Station • •
• Kozhumankondan-Cbe Ss • • Matlampatti Sub-Station
•
• Nagadasampatti SubStation • Nocchipatti Sub-Station
•
• Papparapatti Power-
•
•
• Kadayur-Erode Upgradation Of Ss Kanavanahalli Sub-Station • Kaniyur-Cbe Ss Kavalakarankottai Sub• Kolathupalayam SubStation Station Kundah Pumped Storage • Madampalayam- Cbe Ss Hydroelectric Mettur Thermal Power • Muthampatti Sub-Station Station Neelambur-Cbe Ss • Netaji Apparel Park-Cbe Ss North Chennai Thermal • Odasalpatti Sub-Station Power Station Pappireddipatti Power• Samichettipatti Sub-
Station Station • Sholinganallur Sub• Sindalpadi Sub-Station Station • Udangudi Power • Urachikottai-Erode Ss • Vadugapatty Sub-Station
Station • Sunguvarchattiram SubStation • Uthiyur-Erode Ss