Duro Shox Pvt Limited
SAP Implementation Project – ‘‘Pragati”
USER MANUAL
USER MANUAL Materials Management
DOCUMENT CONTROL SHEET GENERAL INFORMATION Project name Implementation
Document name Materials Management
DOCUMENT INFORMATION Version Filename Date
Author
Reviewed by
Document location
Changes from previous version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
V 1.0
Version
EUT -MM
REFERENCE DOCUMENTS Document
Version
R Reference
DOCUMENT APPROVALS
Kedar Kulkarni MM Consultant Prepared by (KPIT Cummins Infosystems Limited.)
Confidential Page 2 of 316
Approved by (Duro Shox Pvt Limited)
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
USER PROCEDURE MANUAL TABLE OF CONTENTS Duro Shox Pvt Limited________________________________________________1
1 Procurement of Stock Materials .............................................................................................................10 1.1
Procurement of Stock Materials – Raw Material Local / Return___________10
1.1.1 Purpose.....................................................................................................................................................10 1.1.2 Prerequisites .............................................................................................................................................10 1.1.3 Material Master Record..............................................................................................................................10 1.1.4 Vendor Master Record...............................................................................................................................24 1.1.5 Purchasing Info Record.............................................................................................................................35 1.1.6 Source List.................................................................................................................................................41 1.1.7 CIN Master Data........................................................................................................................................43 1.1.8 Excise Condition Record............................................................................................................................53
1.2
Request for Quotation (RFQ)_______________________________________56
1.2.1 Use............................................................................................................................................................56 1.2.2 Procedure..................................................................................................................................................56 1.2.3 Result.........................................................................................................................................................61 1.2.4 Example ....................................................................................................................................................61
1.3
Message output: RFQ_____________________________________________61
1.3.1 Use............................................................................................................................................................61 1.3.2 Procedure..................................................................................................................................................61
1.4
Maintaining Quotation ____________________________________________64
1.4.1 Use............................................................................................................................................................64 1.4.2 Procedure..................................................................................................................................................64 1.4.3 Result ........................................................................................................................................................66 1.4.4 Example ....................................................................................................................................................66
1.5
Price Comparison ________________________________________________67
1.5.1 Use............................................................................................................................................................67 1.5.2 Procedure..................................................................................................................................................67 1.5.3 Result ........................................................................................................................................................69
1.6
Creating Purchase Requisition _____________________________________69
1.6.1 Use............................................................................................................................................................69 1.6.2 Procedure..................................................................................................................................................69 1.6.3 Result ........................................................................................................................................................70 1.6.4 Example.....................................................................................................................................................70
1.7
Release Purchase Requisition______________________________________70
1.7.1 Procedure..................................................................................................................................................71
1.8.
Assign and Process Purchase Requisition___________________________74
1.8.1 Use...........................................................................................................................................................74 1.8.2 Procedure..................................................................................................................................................74 1.8.3 Result ........................................................................................................................................................76
1.9
Purchase Order__________________________________________________77
1.9.1 Use............................................................................................................................................................77 1.9.2 Procedure..................................................................................................................................................77 1.9.3 Result ........................................................................................................................................................82 1.9.4 Example ....................................................................................................................................................82
Confidential Page 3 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.10. Release Purchase Order_________________________________________83 1.10.1. Procedure............................................................................................................................................83
1.11Message Output_________________________________________________87 1.11.1 Use.........................................................................................................................................................87 1.11.2 Procedure................................................................................................................................................87
1.12
Goods Receipt for Purchase Order_________________________________89
1.12.1 Use..........................................................................................................................................................89 1.12.2 Prerequisites ...........................................................................................................................................89 1.12.3 Procedure................................................................................................................................................89 1.12.4 Result ......................................................................................................................................................99 Material document 5000000009 posted...............................................................................................99 1.12.5 Example ..................................................................................................................................................99
1.13
Logistics Invoice Verification____________________________________100
1.13.1 Use........................................................................................................................................................100 1.13.2 Procedure..............................................................................................................................................100 1.13.3 Result ....................................................................................................................................................105 1.13.4 Example ................................................................................................................................................105
1.14
Returning Delivery _____________________________________________106
1.14.1 Use........................................................................................................................................................106 1.14.2 Procedure..............................................................................................................................................106 1.14.3 Result ....................................................................................................................................................113 Return Delivery document created..................................................................................................................113 1.14.4 Example ................................................................................................................................................113
1.15
Excise Invoice Other Movements__________________________________114
1.15.1 Procedure..............................................................................................................................................114 1.15.2 Result ....................................................................................................................................................116 1.15.3 Example ................................................................................................................................................116
1.16
Posting and Printing the Excise Invoice____________________________117
1.16.1 Use........................................................................................................................................................117 1.16.2 Prerequisites .........................................................................................................................................117 1.16.3 Procedure..............................................................................................................................................117 1.16.4 Result ....................................................................................................................................................120
1.17
Credit Memo___________________________________________________121
1.17.1 Use........................................................................................................................................................121 1.17.2 Prerequisites .........................................................................................................................................121 1.17.3 Procedure..............................................................................................................................................121 1.17.4 Result ....................................................................................................................................................127 1.17.5 Example ................................................................................................................................................127
1.18
Reversals / Cancellation of Invoice or Credit Memo __________________127
1.18.1 Use........................................................................................................................................................127 1.18.2 Prerequisites..........................................................................................................................................128 1.18.3 Procedure..............................................................................................................................................128 1.18.4 Result.....................................................................................................................................................133 1.18.5 Example.................................................................................................................................................133
1.19
Reversals / Cancellation of Goods Receipt (GR) _____________________134
1.19.1 Use........................................................................................................................................................134 1.19.2 Prerequisites..........................................................................................................................................134 1.19.3 Procedure..............................................................................................................................................134 1.19.4 Result ....................................................................................................................................................139
Confidential Page 4 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.19.5 Example ................................................................................................................................................139
1.20
Reversing CENVAT Postings _____________________________________140
1.20.1 Purpose.................................................................................................................................................140 1.20.2 Prerequisites .........................................................................................................................................140 1.20.3 Procedure..............................................................................................................................................140 1.20.4 Result.....................................................................................................................................................144 1.20.5 Example.................................................................................................................................................144
1.21
Canceling Excise Invoices _______________________________________145
1.21.1 Purpose.................................................................................................................................................145 1.21.2 Prerequisites .........................................................................................................................................145 1.21.3 Procedure..............................................................................................................................................145 1.21.4 Result.....................................................................................................................................................150 1.21.5 Example.................................................................................................................................................150
2 Procurement of Imported Materials – Business Process Procedure....................................................151 2.1 Procurement of Imported Materials________________________________151 2.1.1 Purpose..................................................................................................................................................151 2.1.2 Prerequisites ...........................................................................................................................................151
2.2 Creating Purchase Order ________________________________________152 2.2.1 Use.........................................................................................................................................................152 2.2.2 Prerequisites ...........................................................................................................................................152 2.2.3 Procedure................................................................................................................................................152 2.2.4 Result ......................................................................................................................................................158 2.2.5 Example ..................................................................................................................................................158
2.3
Release Purchase Order__________________________________________159
2.3.1 Procedure................................................................................................................................................159
2.4
Message Output_________________________________________________162
2.4.1 Use..........................................................................................................................................................162 2.4.2 Procedure................................................................................................................................................162
2.5
CAPTURING BILL OF ENTRY_____________________________________164
2.5.1 Use..........................................................................................................................................................164 2.5.2 Procedure................................................................................................................................................164 2.5.3 Result ......................................................................................................................................................171 2.5.4 Example ..................................................................................................................................................171
2.6
Goods Receipt for Imported Purchase Order_________________________172
2.6.1 Use..........................................................................................................................................................172 2.6.2 Procedure................................................................................................................................................172 2.6.3 Result ......................................................................................................................................................183 2.6.4 Example ..................................................................................................................................................183
2.7
Logistics Invoice Verification for the Materials_______________________184
2.7.1 Use..........................................................................................................................................................184 2.7.2 Procedure................................................................................................................................................184 2.7.3 Result ......................................................................................................................................................190 2.7.4 Example ..................................................................................................................................................190
3 Procurement of Subcontracting Materials – Business Process Procedure..........................................191 3.1
Procurement of Subcontracting Materials___________________________191
3.1.1 Purpose...................................................................................................................................................191 3.1.2 Prerequisites ...........................................................................................................................................191
Confidential Page 5 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
3.2
Version
Creation of Subcontracting Purchase Order__________________________192
3.2.1 Use..........................................................................................................................................................192 3.2.2 Prerequisites ...........................................................................................................................................192 3.2.3 Procedure................................................................................................................................................192 3.2.4 Result ......................................................................................................................................................196 3.2.5 Example ..................................................................................................................................................196
3.3
Message Output_________________________________________________197
3.3.1 Use..........................................................................................................................................................197 3.3.2 Procedure................................................................................................................................................197
3.4
Transfer of Components to Subcontractor___________________________199
3.4.1 Use..........................................................................................................................................................199 3.4.2 Prerequisites ...........................................................................................................................................199 3.4.3 Procedure................................................................................................................................................199 3.4.4 Result ......................................................................................................................................................201 3.4.5 Example ..................................................................................................................................................202
3.5
Creation of Subcontracting Challan_________________________________202
3.5.1 Use..........................................................................................................................................................202 3.5.2 Prerequisites............................................................................................................................................202 3.5.3 Procedure................................................................................................................................................202 3.5.4 Result ......................................................................................................................................................204 3.5.5 Example ..................................................................................................................................................204
3.6 Printing of Subcontracting Challan________________________________205 3.6.1 Use.........................................................................................................................................................205 3.6.2 Procedure................................................................................................................................................205
3.7
Goods Receipt for Purchase Order _________________________________209
3.7.1 Use..........................................................................................................................................................209 3.7.2 Prerequisites ...........................................................................................................................................209 3.7.3 Procedure................................................................................................................................................209 3.7.4 Result ......................................................................................................................................................217 3.7.5 Example ..................................................................................................................................................217
3.8
Reconciling Subcontracting Challan________________________________218
3.8.1 Use..........................................................................................................................................................218 3.8.2 Procedure................................................................................................................................................218 3.8.3 Result ......................................................................................................................................................220 3.8.4 Example ..................................................................................................................................................220
3.9
Completing/Reversal/Re-credit Subcontracting Challan________________221
3.9.1 Use..........................................................................................................................................................221 3.9.2 Procedure................................................................................................................................................221 3.9.3 Result ......................................................................................................................................................222 3.9.4 Example ..................................................................................................................................................222
3.10
Logistics Invoice Verification for Subcontracting Material_____________222
3.10.1 Use........................................................................................................................................................222 3.10.2 Procedure..............................................................................................................................................222 3.10.3 Result ....................................................................................................................................................226 3.10.4 Example ................................................................................................................................................226
5. Procurement of External Services: Business Process Procedure.......................................................227 5.1
Procurement of External Services – Procurement Process_____________227
5.1.1 Purpose...................................................................................................................................................227 5.1.2 Prerequisites ...........................................................................................................................................227
Confidential Page 6 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
5.2
Version
Creating Service Master__________________________________________228
5.2.1 Use..........................................................................................................................................................228 5.2.2 Procedure................................................................................................................................................228 5.2.3 Result ......................................................................................................................................................229
5.3
Creating Purchase Requisition ____________________________________230
5.3.1 Use..........................................................................................................................................................230 5.3.2 Procedure................................................................................................................................................230 5.3.3 Result ......................................................................................................................................................235 5.3.4 Example...................................................................................................................................................235
5.4
Assign and Process Purchase Requisition___________________________236
5.4.1 Use..........................................................................................................................................................236 5.4.2 Procedure................................................................................................................................................236 5.4.3 Result ......................................................................................................................................................239
5.6 Purchase Order_________________________________________________239 5.6.1 Use.........................................................................................................................................................239 5.6.2 Prerequisites ...........................................................................................................................................240 5.6.3 Procedure................................................................................................................................................240 5.6.4 Result ......................................................................................................................................................242 5.6.5 Example ..................................................................................................................................................243
5.7
For Releasing Purchase Order Refer User Manual of Stock Procurement_243
5.8
Message Output_________________________________________________243
5.8.1 Use..........................................................................................................................................................243 5.8.2 Procedure................................................................................................................................................243
5.9
Creation and Acceptance of Service Entry Sheet _____________________245
5.9.1 Use..........................................................................................................................................................245 5.9.2 Procedure................................................................................................................................................246 5.9.3 Result ......................................................................................................................................................256 5.9.4 Example ..................................................................................................................................................256
5.10
Logistics Invoice Verification_____________________________________257
5.10.1 Use........................................................................................................................................................257 5.10.2 Procedure..............................................................................................................................................257 5.10.3 Result ....................................................................................................................................................261 5.10.4 Example ................................................................................................................................................261
6 Asset Procurement – Business Process Procedure...............................................................................262 6.1
Purchase Order_________________________________________________262
6.1.1 Use..........................................................................................................................................................262 6.1.2 Procedure................................................................................................................................................262 6.1.3 Result.......................................................................................................................................................266
6.2
Release of Purchase Order _______________________________________266
6.2.1 Procedure................................................................................................................................................266
6.3
Goods Receipt for Purchase Order_________________________________267
6.3.2 Use..........................................................................................................................................................267 6.3.3 Prerequisites ...........................................................................................................................................267 6.3.4 Procedure................................................................................................................................................267 6.2.3 Result.......................................................................................................................................................269
6.4
Post Excise Invoice______________________________________________269
6.4.1 Procedure...............................................................................................................................................269
Confidential Page 7 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6.4.2 Result......................................................................................................................................................271
6.5
Logistics Invoice Verification______________________________________272
6.5.1 Use..........................................................................................................................................................272 6.5.2 Procedure................................................................................................................................................272 6.5.3 Result.......................................................................................................................................................275
7 Excise Periodic Processing – Business Process Procedure..................................................................276 7.1
Excise Periodic Processing _______________________________________276
7.1.1 Purpose...................................................................................................................................................276 7.1.2 Prerequisites............................................................................................................................................276
7.2
Excise Report - CENVAT Register __________________________________277
7.2.1 Use..........................................................................................................................................................277 7.2.2 Prerequisites............................................................................................................................................277 7.2.3 Procedure................................................................................................................................................277 7.2.4 Result ......................................................................................................................................................279
7.3 Excise Register Updation....................................................................................................................280 7.3Updation of RG1 Register ________________________________________280 7.3.1 Use..........................................................................................................................................................280 7.3.2 Prerequisites............................................................................................................................................280 7.3.3 Procedure................................................................................................................................................280 7.3.4 Result ......................................................................................................................................................287
7.4
RG1 Register Extraction__________________________________________288
7.4.1 Use..........................................................................................................................................................288 7.4.2 Prerequisites............................................................................................................................................288 7.4.3 Procedure................................................................................................................................................288 7.4.4 Result ......................................................................................................................................................291
7.5
RG1 Register Print Utility_________________________________________292
7.5.1 Use..........................................................................................................................................................292 7.5.2 Prerequisites............................................................................................................................................292 7.5.3 Procedure................................................................................................................................................292 7.5.4 Result ......................................................................................................................................................295
8. PLA Register Extraction.......................................................................................................................295 8.1
PLA Register Extraction__________________________________________295
8.1.1 Use..........................................................................................................................................................295 8.1.2 Prerequisites............................................................................................................................................295 8.1.3 Procedure................................................................................................................................................295 8.1.4 Result ......................................................................................................................................................298
8.2
PLA Register Print Utility_________________________________________298
8.2.1 Use..........................................................................................................................................................298 8.2.2 Prerequisites............................................................................................................................................298 8.2.3 Procedure................................................................................................................................................298 8.2.4 Result ......................................................................................................................................................300
9. Reports .................................................................................................................................................301 7.1
Purchasing____________________________________________________301
7.1.1 Purchasing Documents per Vendor (ME2L)............................................................................................301 7.1.2 Purchasing Documents per Material (ME2M)..........................................................................................302 7.1.3 Source List for Material (ME0M)..............................................................................................................303 7.1.4 Purchase Info Record per Material (ME1M).............................................................................................303
Confidential Page 8 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7.1.5 Purchasing Values(MC$G)......................................................................................................................305
9.2
Inventory_______________________________________________________307
9.2.1 Material Document List (MB51)...............................................................................................................307 9.2.2 Diplay Warehouse Stock (MB52).............................................................................................................309 9.3.3 Stock on Posting Date (MB5B)...............................................................................................................310 9.3.4 Stock Overview (MMBE).........................................................................................................................313 9.3.5 Stock in Transit (MB5T)..........................................................................................................................314 9.3.6 Slow Moving Items (MC46).....................................................................................................................314
Icons Icon
Meaning Caution Example Note Recommendation Syntax
Abbreviations R
Required entry field (used in the end-user procedures)
O
Optional entry field (used in the end-user procedures)
C
Conditional field
Confidential Page 9 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
(used in the end-user procedures)
1 Procurement of Stock Materials 1.1 Procurement of Stock Materials – Raw Material Local / Return 1.1.1
Purpose
This process describes the procurement process of raw materials from indigenous source of supply with Country Version India (CIN) relevant process like processing of Excise Duty (ED) and Sales Tax (ST) process.
1.1.2
Prerequisites
The following scenario specific master data must be created for operation of this building block. 1. 2. 3. 4. 5. 6.
Material Master Record Vendor Master Record Purchase Info Record (Optional) Source List (Optional) CIN Master Data Excise Condition Record (if Tax applicable for the Vendor-Material Combination)
1.1.3 Menu Path T Code
Material Master Record Logistics Materials Management Material Master Material Create (General) MM01 – Create MM02 – Change MM03 – Display
Confidential Page 10 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Internal Number assignment . Enter the Industry Sector Enter the Material Type
Press Enter to see the pop-up window.
Confidential Page 11 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Select the required views and press Enter to input the organizational levels.
Confidential Page 12 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press Enter to input the details of the Material.
1.1.3.1
Basic Data Views
Enter the Material Description Enter the Unit of Measure and material Group Enter the division if Stock Transfer will happen for this material Blocking for Procurement or BOM enter here Enter the Gross and Net Weight for the Finished Goods
Enter here if the material is returnable packing as VERP and non returnable packing as LEIH
Confidential Page 13 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Press Additional Data to maintain Alternate Unit of Measures
Enter any Basic Material is there
Press Additional Data to maintain the Alternate Unit of Measures (for e.g. 1000G= 20Nos for the Semi finished goods)
Confidential Page 14 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press Main data to go to the next view
Confidential Page 15 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.3.2
Purchasing Views
Enter the Purchasing Group – Person/Group responsible to procure this material If the Ordering Unit is other than the Base UoM, enter the Unit and make VAR. OUn as 1
Enter the Purchasing Value Key as G1 (5% Delivery Tolerance) or G2 (10% Delivery Tolerance) Select if QM is not active and want to post to Inspection Stock (Mainly used for Spares) Source list should be maintained for this material select the box. Enter the No. of Days required for GR Processing once the material is arrived at factory.
Confidential Page 16 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the PO Text normally specification is maintained
Confidential Page 17 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.3.3
MRP Views
Enter the appropriate MRP Type)
Confidential Page 18 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 19 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Work Scheduling View:
Confidential Page 20 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.3.4
Quality Management View
Confidential Page 21 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.3.5
Version
Accounting Views
Enter the appropriate Valuation Class (Various Valuation Classes given below) Enter the Price Control as V-Moving Average and S-Standard If Price Control is V enter the Moving Average price, S enter the Standard Price
Confidential Page 22 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.3.6
Version
Costing Views
Enter Respective Profit Centre of Plant/Depot
After entering all the details, press
to save the Material.
Confidential Page 23 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.4 Menu Path T Code
Vendor Master Record Logistics Materials Management Purchasing Master Data Vendor Central XK01 – Create XK02 – Change XK03 – Display
Vendor Number to be put manually Enter Company Code Enter Purchasing Organisation Enter Account Group (Various Group given below)
Press Enter to input the details of the vendor. Vendor Account Groups: VDOM Domestic Vendors VIMP Import Vendors VSRV Service Vendors
Confidential Page 24 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.4.1
General Data
Confidential Page 25 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click on the CIN Details to enter the Vendor Excise and Sales Tax details
Confidential Page 26 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter all the details in the respective fields
Excise Indicator for Vendor as 1 – 100% Taxable
Confidential Page 27 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter all the details in the respective fields
Confidential Page 28 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the detail in the respective field
Enter whether this vendor is approved or on Probation
Confidential Page 29 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
No need to enter in the below screen.
Confidential Page 30 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.4.2
Accounting Data
Enter the appropriate Reconciliation Accounts (Various Accounts given below)
Reconciliation Accounts:
Confidential Page 31 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Enter the appropriate Payment Terms and Select the Chk double inv Enter the appropriate Payment Methods C – Cheque, E – Cash Payment, T – Bank Transfer
The below screen is explained in detail in FI User Manual:
Confidential Page 32 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.4.3
Version
Purchasing Data
Enter the Order Currency, Terms of Payment and Incoterms
Enter the appropriate Schema group, Vendor (Various groups given below)
1. Select GR-based Inv. Verf if Invoice verification is done after GR 2.. Select the Srv-based Inv. Verf if Invoice Verification is done after Service Entry sheet.
Schema group, Vendor: DM IM
Domestic Schema Import Schema
Confidential Page 33 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Enter the Partner for the appropriate Partner Functions
Press
to save the Vendor master and the no is generated automatically.
Confidential Page 34 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.5 Menu Path
T Code
Version
Purchasing Info Record SAP Easy Access Logistics Materials Management Purchasing Master Data Info Record Create ME11 – Create ME12 – Change ME13 - Display
You use this component if you wish to store information on a vendor and a material as master data at purchasing organization or plant level. You can create purchasing info records for different procurement types (standard, subcontracting, pipeline, consignment).
Enter the Info Category as 1. Standard – For normal Procurement (Domestic, Import, etc) 2. Sub-Contracting – For Sub-Contracting
Press enter the details in the Purchasing Info Record.
Confidential Page 35 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
If the message is displayed like this, intimate the Quality Person to maintain the QM Info Record (TCode: QI01)
Confidential Page 36 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
No need to enter anything in the below screen as it copies all the data from the Vendor Master.
Confidential Page 37 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
It is defaulted from the Material Master but change for this Vendor-Material combination if different. Enter the Standard Quantity Enter the appropriate Tax Code It is defaulted from the Material Master but change for this Vendor-Material combination if different. Enter the Net Price
Confidential Page 38 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
It is defaulted from the Material Master but change for this Vendor-Material combination if different.
Confidential Page 39 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.5.1
Result Purchasing Info Record is created
1.1.5.2
Example Purchasing Info Record 5300000384 is created.
Confidential Page 40 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.6 Menu Path
T Code
Source List SAP Easy Access Logistics Materials Management Purchasing Master Data Source List Maintain ME01 – Maintain ME03 – Display ME04 - Changes
Enter the Material No. and Plant
Confidential Page 41 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Select if the Vendor is fixed
Version
Select if the Vendor is blocked for Procurement for this particular material alone
Enter 1 to be included in MRP Run Maintain the Validity Period till until which you will procure this material from this vendor
Enter the Vendor and Purchasing Organisation
Result: Source List changed.
Confidential Page 42 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.7 Menu Path T Code
1.1.7.1
CIN Master Data J1ILN SAP Menu Indirect Taxes Master Data Excise Rate Maintenance J1ID
Chapter IDs
Select Chapter ID and Press
Confidential Page 43 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press New Entries to Create New Chapter ID
Press New Entries to go to the next screen.
Confidential Page 44 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Chapter ID
Enter the Description as per law
Press
to save the data.
Confidential Page 45 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.7.2
Material ID and chapter ID combination
Select the Material and Chapter-Id Combination
Select Material and Chapter ID Combination and Press
Confidential Page 46 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press New Entries to Create New Material Number and Chapter ID Combination
Confidential Page 47 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Material No. and Chapter ID Combination
Enter the material type based on the Material Nature
Press
to save the data.
Confidential Page 48 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.7.3
Vendor Excise Details
Either you can maintain here or else in Vendor Master.
Select the Vendor Excise Details
Confidential Page 49 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press New Entries to Create Vendor Master Excise Details
Press
to save the data.
Confidential Page 50 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.7.4
Excise Indicator for Plants
Select the Excise Indicator for Plant
Select Excise Indicator for Plant and Press
Confidential Page 51 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press New Entries to Create Plant Excise Details
Press
to save the data.
Confidential Page 52 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.1.8 1.1.8.1
Excise Condition Record
Use When you enter a purchasing document, for example, a purchase order, the R/3 System automatically calculates the applicable excise duties using the condition technique.
1.1.8.2
Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu No Menu path available for this transaction Transaction code
FV11
2. Enter the appropriate Condition type (various condition types given in next page) and maintain the respective values.
Enter the appropriate condition type
Confidential Page 53 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Various combinations to maintain the condition record
For Raw Material / Packing Material maintain the Plant/Vendor/Material Combination. For Service Tax /Assets maintain the Plant/Material Group Combination. .
Confidential Page 54 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Plant and Vendor
Enter the Material No.
Enter the Value / amount
3. Press Ctrl+S or 4.
1.1.8.3
Result Condition records saved.
Confidential Page 55 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.2 Request for Quotation (RFQ) 1.2.1
Use
Request for Quotation is used to float enquiries in market to obtain quotations from prospective vendors. This transaction is optional for the process.
1.2.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Material Management Purchasing RFQ/quotation Request for Quotation Create Transaction code ME41 2. RFQ can be created with reference to Purchase Requisition, Outline Agreement (Contract) and another RFQ. 3. On the Create RFQ: Initial Screen, make the following entries:
1. Enter the RFQ type as “AN” 2. Enter the Quotation Deadline 3. Enter Purch. Organisation as 1101 4. Enter the respective Purchasing group
Confidential Page 56 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Press this button to enter the Collective No and Vendor Reference
Enter the Submission date
Enter the appropriate Item category for SubContracting & Service
1. Enter the Material No 2. Enter the RFQ Quantity 3. Enter the Deliv. Date 4. Enter the Plant if it is Plant specific
4. Choose (header details icon) on the toolbar, then on screen Create RFQ: Header Data, enter information in the fields as specified in the table below:
Confidential Page 57 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press this button to enter the vendor code for which it has to be sent?
Enter the Collective No to have a track of all RFQs related to particular instance
Enter the Your Reference if any reference given by the vendor
Confidential Page 58 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5. Choose (vendor address button) on the toolbar, then on screen Create RFQ: Vendor Address, enter information in the fields as specified below:
After entering the vendor code and pressing enter the details of vendor will be displayed automatically.
Confidential Page 59 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6. Press to Save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation of the same RFQ data to a new vendor by following the steps outlined above.
Confidential Page 60 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.2.3
Version
Result
RFQ created Similarly create for other vendor in the same screen and various RFQ Nos will be generated
1.2.4
Example
RFQ created under the number 6000000000.
1.3 Message output: RFQ 1.3.1
Use
A RFQ needs to be printed for transmitting to vendor. This transaction is optional for the process.
1.3.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
Logistics Materials Management Purchasing RFQ/Quotation Request for Quotation Messages Print/Transmit
Transaction code
ME9A
2. On the Message Output screen, make the following entries:
Confidential Page 61 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Enter the RFQ Nos to be printed and Execute (F8) Press this button to Execute
Select the check box
For Printout click this button which will create Spool Request.
For Print Preview click this button
Confidential Page 62 of 316
For Direct Printout click this button
Materials Management User Manual For Duro Shox Pvt Limited 1.0 You will see out put as
Confidential Page 63 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.4 Maintaining Quotation 1.4.1
Use
This transaction is used to maintain the quotation, which is submitted by vendors. Vendor communicates price for material and as a result the RFQ (Request for Quotation) needs to be updated. This transaction is optional for the process.
1.4.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing RFQ/quotation Quotation Maintain Transaction code
ME47
2. On the Maintain Quotation: Initial Screen, make the following entries:
3. Choose the Enter key, or choose green Enter icon to proceed. 4. View the screen “Maintain Quotation: Header Data” by Choosing on the Header data icon in the toolbar.
Confidential Page 64 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5. Enter information in the fields as specified in the table below. Some fields will not be available for input, as they are reference fields only.
2. Press to enter the conditions
1. Press to select the line
6. Once all necessary header data has been maintained, the user can then enter the price information in one of two fashions:
Enter the Conditions given by vendor.
a. Enter the price in the Net Price field on the Maintain Quotation: Item Overview screen by Choosing overview icon on toolbar.
Confidential Page 65 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
b. To enter more detailed information in addition to the net price, select the line item and choose the Item Details icon. Choose the green Back arrow to return to the ‘Overview’ screen once data has been maintained. i. A vendor’s quoted price can be entered in one of two ways. ii. Enter the net price per unit in the Net price field. This price includes the vendor's normal discounts and surcharges only. Cash discounts (for prompt payment) and taxes are calculated separately. iii. Enter the gross price in the Net price field, and maintain the conditions for the item. Then the system automatically replaces the entered gross price with the calculated net price. If the net price for an item is entered for which pricing conditions have been maintained, the system always replaces the price entered with the calculated net price. iv. Enter the Tax Code for any relevant taxes (for example, Excise Duty, Sales Taxes etc.) in the Tax code field. If a purchase order is created by referencing an RFQ, this code facilitates the determination of the tax amount when the invoice is entered in the system. v. After entering tax code, after choosing this system may give an information message showing the effective price, Choose Enter to continue.
7. Once all quotation information has been successfully entered, save the data by Choosing on the Save button, or Choose the keys. A message will be displayed that the data has been saved.
1.4.3
Result
Quotation is maintained.
Maintain the same for other RFQs.
1.4.4
Example
Quotation for RFQ 6000000000 maintained.
Confidential Page 66 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.5 Price Comparison 1.5.1
Use
Required to compare prices from all quotations received as a result of a competitive bidding process. This transaction is optional for the process.
1.5.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing RFQ/Quotation Quotation Price Comparison Transaction code
ME49
2. On the Price Comparison List screen, make the following entries:
Enter the Purchasing Organisation Enter the Quotations to be compared or the Collective RFQ
Parameters included for Comparison
a. Choose the comparison values to be used: i. Reference quotation: You can compare the quotations within the list with a sample quotation. The system displays the percentage deviation between each quotation in the list and the sample quotation. ii. Mean/minimum value quotation: The price comparison list can also display a "fictitious" quotation reflecting the average or minimum value of all quotations. Select either the "Mean value" or "Minimum value" quotation field to choose the type of fictitious quotation. iii. Percentage basis: The price comparison list displays the percentage of each item in relation to the maximum, minimum, or average price. To determine the display type, enter one of the following:
Confidential Page 67 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
+: The highest value for each item is the 100% value -: The lowest value for each item is the 100% value _: The mean value for each item is the 100% value b. Select the desired price computations: i. Select the appropriate field to determine which of the following should be included in the determination of the comparison price: i. Include cash discounts ii. Include delivery costs iii. Determine effective price 3. Once all entries have been made, Choose the Execute. 4. On screen “Price Comparison List in Currency INR”, view the Price Comparison list.
Rank is generated automatically
Mean and Effective Price is highlighted
5. To view any of the following information for a particular quote included in the comparison, Choose the RFQ number with the mouse to select it, then Choose the appropriate icon/button on the menu toolbar: 6. Display Material: Allows the user to view the purchasing data in the material master record. 7. Display Vendor: Allows the user to view the vendor master record. 8. Additional Info: Allows the user to view payment terms, bid dates, currency information for all the vendor quotations in the list. 9. If any information has been modified through the comparison list, save the RFQ before exiting. If changes have been made and the user attempts to exit without saving, the system will return a message to verify action. 10. To exit the transaction, choose the green Back arrow, the yellow Exit arrow, or Choose the F3 button.
Confidential Page 68 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.5.3
Version
Result
Price Comparison List in Currency INR is displayed on the screen.
1.6 Creating Purchase Requisition 1.6.1
Use
A Purchase Requisition is created to indicate purchase department to procure materials or services with details like how much quantity is required, when required. Generally it is created automatically for Raw materials and Packing Materials through MRP Run and Spares and Service related to Plant Maintenance Purchase Requisition is generated automatically from Plant maintenance Order. This transaction is optional for the process.
1.6.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
Logistics Materials Management Purchasing Purchase Requisition Create
Transaction code
ME51N
Confidential Page 69 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2. On the Create Purchase Requisition screen, make the following entries:
Enter Material No.
Enter required Quantity
Enter the Desired Vendor if Vendor is known to the person who is creating PR
Press
or Ctrl+S to Save the Purchase Requisition.
1.6.3
Result
1.6.4
Example
Purchase requisition number 0010000000 created.
1.7
Release Purchase Requisition
Confidential Page 70 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.7.1 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
Logistics Materials Management Purchasing Purchase Requisition Release Individual Release
Transaction code
ME51N
Click Other Purchase Requisition
Enter PR No.
Confidential Page 71 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Click This Icon to Release PR
Click This Icon to Release
Confidential Page 72 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click This Icon to Save
Confidential Page 73 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.8.
Version
Assign and Process Purchase Requisition
1.8.1 Use a) This section explains the functions provided by the SAP System for converting requisitions into external purchasing documents (purchase orders, contract release orders, scheduling agreement delivery schedules, RFQs), and the processing options thereby available to you: •
Assigning means defining the desired source for each purchase requisition item o Further processing involves generating lists of requisitions that have been assigned or flagged as outlined above, and the subsequent creation of RFQs, purchase orders, or lines of delivery schedules under scheduling agreements.
1.8.2 Procedure 2. Access the transaction choosing one of the following navigation options: SAP R/3 menu Transaction code
Logistics Materials Management Purchasing Purchase Requisition Follow-On Functions Assign and Process ME57
Confidential Page 74 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. The assignment of sources to and further processing of purchase requisitions are two distinct functions. You can choose whether you wish to perform the functions in two separate steps or in just one. 4. Below are the Selection Parameters to restrict the process of PO from PR
1. Enter the appropriate Purchasing Group 2. Enter the Scope of List as B1 for PR generated through MRP Run and A for remaining PR 3. Enter the appropriate Plant
1. Select the Assigned Purchase Requisition (For Spares PR normally the End User may have entered the Vendor in the PR) 2. Select the appropriate Check boxes for Processing the PR
5. Press
or F8 to enter into the next screen.
Confidential Page 75 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1. If Source List is available click this button
1. Select the check boxes required PR which are to be converted in to Pos.
After assigning the source click on to this button to process the PO or else save for the assignment of source
1. Since only one source is assigned in Source list system assigns the source automatically or else if more than one source available a Pop-up window will be coming where one vendor has to be selected.
6. O is explained in next chapter.
1.8.3 Result The source is assigned to PR and can be processed for PO.
Confidential Page 76 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.9 Purchase Order 1.9.1 Use A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. This transaction is mandatory for the process.
Please ensure that Purchase Order Value does not exceed specified value and if the purchase order value crosses this limit a release procedure is applied on this purchase order. To release the Purchase Order go to ME28 for collective release and ME29N for individual release.
1.9.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known Transaction code ME21N
Confidential Page 77 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2. If you want create purchase order with reference to the purchase requisition, on item details screen enter the purchase requisition number and item number at Purch. Req. field. System will automatically adopt all the data from requisition.
Click the Purchasing Requisitions and Press Adopt
Press this button to view the Tax Calculation
Confidential Page 78 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 79 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Press this button to view the message
Confidential Page 80 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Check the PO before Saving
Confidential Page 81 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.9.3 Result Purchase Order is created.
1.9.4 Example Standard PO created under the number 210000000.
Confidential Page 82 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.10. Release Purchase Order 1.10.1. Procedure Access the transaction choosing one of the following navigation options: SAP R/3 menu
Logistics Materials Management Purchasing Purchase Order Release Individual Release
Transaction code
ME29N
Click Other Purchase Order
Enter PO No.
Confidential Page 83 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click This Icon to Release PR
Confidential Page 84 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click This Icon to Release
Click This Icon to Save
Confidential Page 85 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 86 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.11Message Output 1.11.1 Use A Purchase Order needs to be printed for transmitting to vendor.
1.11.2 Procedure 2. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit Transaction code
ME9F
3. On the Message Output screen, make the following entries
4. Choose
to Execute.
Confidential Page 87 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
5. On screen Message Output select the appropriate Document number and perform the following:
Choose Output Message and/or Choose Display Message and/or Choose Message Detail and/or Choose Trial Printout.
Confidential Page 88 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.12 Goods Receipt for Purchase Order 1.12.1 Use Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general ledger accounts are also posted and stocks are updated.
1.12.2 Prerequisites Purchase Order
1.12.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known Transaction code 2.
MIGO
On the Goods Receipt Purchase Order screen, make the following entries: Check for correct movement type whenever doing goods movement
Enter the Purchase Order No and Press Enter
Confidential Page 89 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 3.
After pressing Enter system will fetch all the data from the Purchase Order as shown below:
Whichever material is in Blue those detail will be seen in the Item detail
Confidential Page 90 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 4.
System defaults the balance quantity in PO, change the quantity to the received quantity:
Confidential Page 91 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Storage Location in which the material to be placed.
Confidential Page 92 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Delivery Note details of the vendor
Select Item Ok and Press Enter and the Excise tab will appear both in Header and Item Level
Confidential Page 93 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Field name
Description
R/ O/ C
User action and values
Goods Receipt
Goods Receipt
R
Select from drop down list for action
Purchase Order
Purchase Order
R
input the PO number which generated above 4500000277
Movement Type
Version
Comment
101 Enter
Document Date
Document Date
R
Enter document date
Delivery Note
in Header
O
Delivery Number from Vendor
Vendor
Vendor
R
Defaulted from purchase order
Posting Date
Posting date
R
Enter posting date
Bill of lading
Bill of lading
O
Enter bill of lading
Header text
Header text
O
Enter header text
Grayed out
Close Header Detail data to enlarge the Detail data. Select Material tab at Detailed Data. Material
Material tab
R
Defaulted from Purchase Order
Grayed out
Enter the quantity you have received from vendor. As a default system will give purchase order quantity Enter the quantity as per vendor delivery challan
Quantity defaulted from Purchase Order
Select Quantity tab in Detail data. Qty in unit of entry
Quantity in unit of entry
R
Qty in delivery note
Quantity in delivery note
O
Select Where tab in Detail data. Movement type
Movement type
R
Defaulted from header screen
Stock type
Stock type
R
Plant
Plant
R
Storage location
Storage location
R
Goods Recipient
Goods Recipient
O
Defaulted from material master or purchase order Defaulted from purchase order 1000 Defaulted from purchase order if entered 1010 Enter the name of person who received goods
Confidential Page 94 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Unloading point
Unloading point
O
Text
Text
O
Version
Enter the text if required
Select Purchase Order tab in Detail data. Purchase Order
Purchase Order
R
Defaulted from header data
Del. completed ind.
Delivery completion indicator
O
Defaulted by system if PO Qty = GR Qty
O
Grayed out
Grayed out
Select Partner tab in Detail data. Vendor
Vendor name
For this material batch management is not active. Just for reference purpose the following data is given. Select Batch tab in Detail data.
This tab will come only if material is managed in batches. Proceed with the following steps if material is batch managed only. Enter batch number as date Batch Batch number R for batch managed materials Enter vendor batch number Vendor batch Vendor batch O for reference 5. Select the Check box Item OK, after entering all the data.
You will get Excise Invoice tab at Header Data for capturing vendor excise invoice details and for posting Part I and Part II.
6. On the Excise Invoice tab at Header Data make the following entries.
Confidential Page 95 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Select Appropriate Excise settings While posting in Case of dealer only
System defaults the Excise Duty (BED & ECS) and in case
Field name
Description
R/O/C
User action and values
Comment
Capture & Post Excise invoice
Capture & Post Excise Invoice on Excise Action
R
Choose Capture & Post Excise Invoice from drop down list
Defaulted
Excise Group
Excise Group
R
Defaulted by the system
Excise Invoice
Excise invoice
R
Enter the vendor Excise Invoice number For example: D013
Excise Inv. Date
Excise Invoice Date
R
Enter the excise invoice date of vendor
BED
Basic Excise Duty
R
Defaulted from purchase order
Grayed out
AED
Additional Excise Duty
R
Defaulted form purchase order
Grayed out
SED
Special Excise Duty
R
Defaulted from purchase order
Grayed out
NCCD
NCCD
R
Defaulted from purchase order
Grayed out
ECS
Education Cess
R
Defaulted from purchase
Grayed out
Confidential Page 96 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 order MRP Indicator
MRP Indicator
O
Tick the check box Note: If the Base Price in PO is the inclusive of both the Material Cost and Excise Value choose the check box
Close Header Detail data to enlarge the Detail data. Select Excise Item tab at Detailed Data (at the last). Chapter ID
Chapter ID of material
R
Defaulted by the system No action required
EI Quantity
Excise Invoice Quantity
R
Defaulted by the system from Goods Receipt quantity
Base Value
Base value of material
R
Defaulted by the system
BED
Basic Excise Duty
R
Defaulted by the system
AED
Additional Excise Duty
O
Defaulted by the system
NCCD
NCCD
O
Defaulted by the system
SED
Special Excise Duty
O
Defaulted by the system
ECS
Education Cess
O
Defaulted by the system
Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other information is defaulted by the system. Hence, no action required by the user.
6. Choose Check at the top of screen. 7. Choose Post to post the document.
Confidential Page 97 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter Excise Invoice No. and Date vendor
Also See the account postings
Confidential Page 98 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.12.4 Result Material document 5000000009 posted 1.12.5 Example Material document 5000000009 posted
Confidential Page 99 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.13 Logistics Invoice Verification 1.13.1 Use In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.
1.13.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction. 3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Enter Invoice Date
Change Defaulted V0 Tax code and tick Calculate tax tab
Enter the PO No.
Confidential Page 100 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
If Part II entry is not done then system will not allow you to POST Invoice
Unless and until you post part2 system will not allow invoice verification
Enter the amount
Confidential Page 101 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Field name
Description
R/ O/ C
User action and values
Transaction
Invoice
R
Select Invoice from drop down list
Header Data
Header data of Invoice
R
Defaulted by system
Basic tab
Basic information tab
R
Select basic information tab to give initial information
Invoice Date
Invoice Date
R
Enter the Vendor invoice date
Reference
Invoice reference
O
Enter the vendor invoice reference For Example USERMANUAL
Posting date
Posting Date
R
Enter the posting date of document
System will give current date as default
Amount
Invoice Amount
R
Enter invoice gross amount including taxes and duties 299,960.20
Amount mentioned is only an example
Currency
R
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order INR
Check box calculate tax
O
Check this tick box, system will calculate tax amount
Tax code
R
Select the tax code from drop down list V1
Bus.place/se ctn
Business place or section code
R
Enter section code if Tax deduction for source is active for this vendor
Text
Text
O
Enter text if required for reference
Payment tab
Payment tab
R
Select payment details tab
BaselineDt
Base line date for payment
R
Enter the base line date for payment
Pmnt terms
Payment terms
O
Payment terms of document, if entered will be defaulted from purchase order
Due on
Payment due on
O
Will be calculated by
Calculate tax
Confidential Page 102 of 316
Comment
Leave blank for this process
Will be defaulted if payment terms entered in PO
Grayed out
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
system Discount
Cash discount
O
Enter if cash discount is offered by vendor
Hide Header data for getting full screen of items if required.
Layout
Purchase order / Schedule Agreement
R
Select Purchase order / Schedule Agreement in the reference document category from drop down list
Purchase order number
R
Enter the first purchase order number generated above
Goods / service items
R
Select Goods / Service items in indicator from drop down list
Layout of invoice verification
R
Select All information from drop down list
Defaulted for user
Defaulted
Choose Enter 4. Choose Enter to complete the document feeding part. 5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color. 6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.
Confidential Page 103 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Check Simulate Tab
7. Choose Save / Post, for posting the document.
Confidential Page 104 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.13.3 Result Logistics Invoice verification document is posted.
1.13.4 Example Document no. 5105600102 created
Confidential Page 105 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.14 Returning Delivery 1.14.1 Use A material has been received and it needs to be returned for various reasons (i.e. poor quality, incomplete, damaged). The user can use this transaction to return the material to the vendor via the original GR document. This transaction itself is an independent transaction and it is not mandatory in J81 process. This Return Delivery transaction is used only when material is rejected and needs to be returned to vendor. If material is rejected by using QM process there is no need to this transaction. This transaction can be used only without QM process materials.
This transaction is used basically when purchased material is needs to be sent back to vendor because of various reasons like poor quality, incomplete items, damaged etc. b) Bore proceeding with return delivery to vendor please ensure that sufficient stock is available in storage location and if batch managed in particular batch stocks also. Other wise system will give error message.
Before doing Return Delivery to vendor, check if you have already done Invoice Verification to that Goods Receipt. If you have already done invoice verification please raise Credit Memo to the extent of Returns quantity and then proceed with this process. Other wise system will give an error message. How to create Credit Memo transaction is explained in the chapter mentioned 1.17 below.
1.14.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known Transaction code
MIGO
2. Select Return Delivery from drop down list to make Return Delivery to vendor.
3. On the Return Delivery Material Document screen, make the following entries:
Confidential Page 106 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the quantity to be returned to vendor
Enter the appropriate Reason for Movement
Confidential Page 107 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Select Blocked Stock to Return the rejected Material
Enter the appropriate Reason for Movement
Field name
Description
R/ O/ C
User action and values
Return Delivery
Return Delivery
R
You have already selected in above step 2
Material Document
Material Document number
R
Select from drop down list 5000000189 Enter the material document number which you have made at the time of Goods Receipt for purchase order
Enter Document Date
Document Date
R
Enter document date
Delivery Note
in Header
O
Delivery Number. Will be defaulted if you have already entered in original document
Posting Date
Posting date
R
Enter posting date
Confidential Page 108 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Bill of lading
Bill of lading
O
Enter bill of lading.
Header text
Header text
O
Enter header text
Via Delivery
Via Delivery
R
Tick the check box
Version
Close Header Detail data to enlarge the Detail data. Select Material tab at Detailed Data. Material
Material tab
R
Defaulted from Purchase Order
Grayed out
Qty in unit of entry
Quantity in unit of entry
R
You can not return more than what you have in stock
Qty in delivery note
Quantity in delivery note
O
Enter the quantity you want to return to vendor. As a default system will give original Goods Receipt quantity 5000 Enter the quantity 100000
Movement type
Movement type
R
Defaulted by the system with 122 movement
Stock type
Stock type
R
Plant
Plant
R
Storage location
Storage location
R
Goods Recipient
Goods Recipient
O
Enter stock type from drop down list Defaulted from original Goods Receipt 1000 Enter the store location from which you want to return to vendor Enter the name of person who received goods
Unloading point
Unloading point
O
Reason for Movement
Reason for Movement
R
Text
Text
O
Select Quantity tab in Detail data.
Select Where tab in Detail data.
Grayed out
Select from the drop down list the reason for this movement of material 0001 Enter the text if required
Select Purchase Order tab in Detail data. Purchase Order
Purchase Order
R
Defaulted from header data
Confidential Page 109 of 316
Grayed out
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Del. completed ind.
Delivery completion indicator
R
Defaulted from purchase order
O
Grayed out
Select Partner tab in Detail data. Vendor
Vendor name
Select Batch tab in Detail data. This tab will come only if material is managed in batches. Proceed with the following steps if material is batch managed only. Enter batch number if Batch Batch number R externally maintained by you or system will allocate batch number Enter vendor batch number Vendor batch Vendor batch O for reference
Enter the Goods Issue Indicator as IPD
Confidential Page 110 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Enter the Sub type as PR for Vendor Returns
Field name
Description
R/ O/ C
User action and values
Comment
Select Create Excise Invoice
Select Create Excise Invoice
R
Choose Create Excise Invoice from drop down list
Select from drop down list
Excise Group
Excise Group
R
Defaulted by the system
Series Group
Excise Series group
R
Defaulted by the system
Removal time
Removal time of goods
R
System defaults current time, change if required
BED
Basic Excise Duty
R
Defaulted from purchase order
Grayed out
AED
Additional Excise Duty
R
Defaulted form purchase order
Grayed out
SED
Special Excise Duty
R
Defaulted from purchase order
Grayed out
Close Header Detail data to enlarge the Detail data. Select Excise Item tab at Detailed Data (at the last).
Confidential Page 111 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Chapter ID
Chapter ID of material
R
Defaulted by the system No action required
EI Quantity
Excise Invoice Quantity
R
Defaulted by the system from return delivery document 2
Base Value
Base value of material
R
Defaulted by the system
BED
Basic Excise Duty
R
Defaulted by the system
Goods Issue Indicator
Goods Issue Indicator
R
Select from drop down list IPD for this process
Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other information is defaulted by the system. Hence, no action required by the user. 4. Choose Check at the top of screen. 5. Choose Post to post the document.
Confidential Page 112 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.14.3 Result Return Delivery document created 1.14.4 Example Return Delivery Document No. 50000000011 created. Note: Excise Invoice for Return delivery also will be generated in the back ground for this transaction
Confidential Page 113 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.15 Excise Invoice Other Movements 1.15.1 Procedure 1. Access the activity choosing one of the following navigation options: SAP CIN R/3 Indirect taxes Sales / Outbound Movements Excise Invoice User menu For Other Movements Excise Invoice for Other Movements Transaction Code J1IS 2. On the Excise Invoice Other Movements – Main Menu screen, make the following entries: 3. Choose Display Excise Invoice icon to start the transaction Enter the Sub type as PR for Vendor Returns
Confidential Page 114 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Field name Reference Doc Number
Description
R/O/C
User action and values
Document Number
R
Doc Year
Document year
R
Enter the return delivery document number which you have created in above step 0000000126 Enter the year of document created Example: 2006
Enter
Confidential Page 115 of 316
Version
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.15.2 Result Excise invoice generated is displayed.
1.15.3 Example Excise invoice 0000000014 generated and displayed.
Confidential Page 116 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.16 Posting and Printing the Excise Invoice 1.16.1 Use Excise Invoice has to be printed and sent along with the material. This is legal requirement in India.
1.16.2 Prerequisites Excise Invoice Document is generated and posted.
1.16.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP CIN R/3 User menu
Indirect taxes Sales / Outbound Movements Excise Invoice For Other Movements Post and Print
Transaction code
J1IV
2. On the SAP screen, make the following entries: 3. If the document is not posted in step mentioned above, Choose Release to Accounting to post Financial Accounting document.
This transaction is used to just printing of excise invoice. 4. Follow the steps mentioned below for taking print of Excise Invoice. Field name
Description
R/ O/ C
User action and values
Comment
Excise internal reference Select internal excise invoice number from drop down list, you can find it with reference to the Excise Invoice number generated in above step 1100400070 for example with the combination of Excise Group 10 and vendor code 10006. Document No.
Document Number
R
Enter the Excise Invoice Document Number generated in above step For example: 127
Document year
Document Year
R
Enter the document year 2006
Confidential Page 117 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5. To take printout, select Goto from the top main menu and select Print Document from the list. Or Choose Control + P to get the access of Excise Invoice Printing screen.
6. Choose Execute icon to get list of excise invoice ready to be printed.
Confidential Page 118 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7. From the list select the excise invoice number by choosing the check box left side of number. 8. To take printout on printer Choose the Printer icon or Choose F8.
Confidential Page 119 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
9. To display excise invoice on screen Choose Display icon or Choose F9. 10. System will give popup asking for pre-printed invoice serial number, Enter pre-printed excise invoice number. In this process Choose 99 for testing purpose (since it is not expected to have pre-printed invoice for testing purpose). 11. Select printer from the drop down list. Check box for Print Immediately and New spool request. 12. Choose Print Preview or Print icons to display on screen or to print on printer mentioned above. 13. If printer is connected system will print the document on printer.
1.16.4 Result Excise Invoice is printed.
Confidential Page 120 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.17 Credit Memo 1.17.1 Use In this process of Logistics Invoice Verification a credit memo is generated on vendor. Please be careful that during the total process after making logistics invoice verification you have made return delivery to vendor. To recover that money you need to do this credit memo transaction.
1.17.2 Prerequisites •
Logistic Invoice Verification is already made
1.17.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.
Confidential Page 121 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Select Credit Memo in this tab
Put the Qty and Price to be returned
Confidential Page 122 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 123 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Field name
Description
R/ O/ C
User action and values
Confidential Page 124 of 316
Version
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Transaction
Credit memo
R
Select Credit memo from drop down list
Header Data
Header data of Invoice
R
Defaulted by system
Basic tab
Basic information tab
R
Select basic information tab to give initial information
Invoice Date
Invoice Date
R
Enter the Vendor invoice date
Reference
Invoice reference
O
Enter the vendor invoice reference
Posting date
Posting Date
R
Enter the posting date of document
Amount
Credit memo Amount
R
Enter invoice (credit memo) gross amount including taxes and duties
Currency
R
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order
Check box calculate tax
O
Check this tick box, system will calculate tax amount
Tax code
R
Select the tax code from drop down list
Bus.place/se ctn
Business place or section code
R
Enter section code if Tax deduction for source is active for this vendor
Text
Text
O
Enter text if required for reference
Payment tab
Payment tab
R
Select payment details tab
BaselineDt
Base line date for payment
R
Enter the base line date for payment
Pmnt terms
Payment terms
O
Payment terms of document, if entered will be defaulted from purchase order
Due on
Payment due on
O
Will be calculated by system
Discount
Cash discount
O
Enter if cash discount is offered by vendor
Calculate tax
Hide Header data for getting full screen of items if required.
Confidential Page 125 of 316
Version
System will give current date as default
Leave blank for this process
Will be defaulted if payment terms entered in PO
Grayed out
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Layout
Purchase order / Schedule Agreement
R
Select Purchase order / Schedule Agreement in the reference document category from drop down list
Purchase order number
R
Enter the purchase order number
Goods / service items
R
Select Goods / Service items in indicator from drop down list
Layout of invoice verification
R
Select All information from drop down list
Version
Defaulted for user
Defaulted
Choose Enter 4. Choose Enter to complete the document feeding part. 5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color. 6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.
7. Choose Save posting the document.
Confidential Page 126 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.17.4 Result Logistics Invoice verification document is posted.
1.17.5 Example Document no. 5105600791 created
1.18 Reversals / Cancellation of Invoice or Credit Memo 1.18.1 Use Invoice documents in Invoice Verification are either invoices or credit memos. These documents can be cancelled. There are two different cases:
Confidential Page 127 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 • •
Version
If an invoice is cancelled, the system automatically creates a credit memo. If a credit memo is cancelled, the system automatically creates an invoice.
The system takes the amount and quantity for the credit memo or invoice from the invoice or credit memo to be cancelled, thus avoiding any differences between the invoice and the credit memo or the credit memo and the invoice.
1.18.2 Prerequisites An invoice document can only be cancelled if: • • •
it was posted in Logistics Invoice Verification It has not already been cancelled It is not a cancellation document for another document
When you cancel documents in Logistics Invoice Verification, the document line items are not automatically cleared in Financial Accounting. We recommend that you periodically clear such items (using daily background jobs, for example).
1.18.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Further Processing Cancel Invoice Document Transaction code
MR8M
2. The initial screen for reversal appears.
Confidential Page 128 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. In the fields Invoice doc. number and Fiscal year, enter the data for the invoice document you want to cancel. 4. In the Reversal reason field, select the reason for cancelling the invoice. This allows you to differentiate between different types of cancellations.
Confidential Page 129 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Enter the reversal reason
5. You can display the document to check. Choose Display document to do this. You can look at the items of the document to be cancelled. Return to the initial screen by choosing Back.
Confidential Page 130 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
6. Choose Invoice document and reverse or Press Ctrl+S or
Confidential Page 131 of 316
Version
.
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 132 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.18.4 Result Document Reversed and Clear FI Documents Manually.
1.18.5 Example Document Reversed with no. 5105600114.
Confidential Page 133 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.19 Reversals / Cancellation of Goods Receipt (GR) 1.19.1 Use When any data entered incorrect during GR posting it has to be reversed. To do the cancellation of GR, all the follow on documents should be reversed.
1.19.2 Prerequisites A GR can only be cancelled if: •
Invoice Verification posted if any should be reversed.
1.19.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known Transaction code
MIGO
Confidential Page 134 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2. Choose Cancellation and enter the respective Material Document No. (GR No.)
Confidential Page 135 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. Press enter so that all the data will be captured automatically by the system. If any comment is there to mention it can be mentioned in the Head Text and Text which is available at the Item level.
Confidential Page 136 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 4. Press Enter to continue and check all the details
5. Select the Check box Item OK, after entering all the data. You will get Excise Invoice tab at Header Data and Item Details.
6. Choose Check at the top of screen.
Confidential Page 137 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7. Press Ctrl+S or
to post the document
Confidential Page 138 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.19.4 Result Material document posted, please note the document number.
1.19.5 Example Material document 5000000020 posted
Confidential Page 139 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.20 Reversing CENVAT Postings 1.20.1 Purpose When the Material Document is cancelled the CENVAT Posting should also be reversed or cancelled.
1.20.2 Prerequisites Material Document (GR) should be reversed.
1.20.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Procurement → Excise Invoice → Incoming Excise Invoice → Central Processing → Capture / Change / Cancel / Display / Post Transaction code
J1IEX
Confidential Page 140 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 2. Select Post CENVAT. 3. Select Vendor Excise Invoice. 4. Enter the excise invoice number.
5. Press Enter to continue
Confidential Page 141 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
6. Choose Simulate CENVAT 7. A dialog box appears, showing which postings the system will make to reverse the CENVAT.
Confidential Page 142 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
8. Choose Post CENVAT.
Confidential Page 143 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.20.4 Result CENVAT Posting Reversed.
1.20.5 Example CENVAT Posting Reversed with document no. 0000000008.
Confidential Page 144 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
1.21 Canceling Excise Invoices 1.21.1 Purpose When the Material Document is cancelled the CENVAT Posting should also be reversed or cancelled.
1.21.2 Prerequisites • •
Material Document (GR) should be reversed. CENVAT Posting should be Reversed.
1.21.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Procurement → Excise Invoice → Incoming Excise Invoice → Central Processing → Capture / Change / Cancel / Display / Post Transaction code
J1IEX
2. Select Cancel. 3. Select Vendor Excise Invoice.
Confidential Page 145 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
4. Enter the excise invoice number.
Confidential Page 146 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
5. Enter the Rejection Code.
Confidential Page 147 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Rejection Code
6. Save the excise invoice.
Confidential Page 148 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7. Press Yes to Cancel the Excise Invoice.
Confidential Page 149 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1.21.4 Result Excise Invoice has been successfully cancelled.
1.21.5 Example Excise Invoice 0000000008 / 2008 ( 1234 ) has been successfully cancelled.
Confidential Page 150 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2
Version
Procurement of Imported Materials – Business Process Procedure 2.1 Procurement of Imported Materials 2.1.1 Purpose This process Procurement of Imported Materials shows you how to handle the Countervailing duty (CVD) on imports, which is levied in place of excise duty. Unlike other forms of customs duties, such as basic customs duty or special customs duty, you can credit CVD paid on imports to your CENVAT account.
2.1.2 Prerequisites The following scenario specific master data must be created for operation of this building block and subsequent dependent building blocks. •
Material Master record
•
Vendor Master record
•
CIN Master Data
(Refer User Manual – Procurement of Stock Materials (Domestic) Ensure that GR based IV is not selected in Purchasing Data. (Refer User Manual – Procurement of Stock Materials (Domestic) (Refer User Manual – Procurement of Stock Materials (Domestic)
Confidential Page 151 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2.2 Creating Purchase Order 2.2.1 Use A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to goods receipt and invoice verification processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.
2.2.2 Prerequisites
Before starting the process, please ensure the following information: •Commissioner of Customs is created as domestic vendor, for example: vendor code 600000 - RBI Commissioner in this process. •In master record of main imported vendor GR-based invoice verification tick should not be there on Purchasing Data screen of vendor master. And Schema group, Vendor is filled with schema group ZI. For example vendor code 200000 in this process. •These are basic master data changes with respect to this process only.
For all purchase order a release procedure is applied.
2.2.3 Procedure 5. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known ME21N Transaction code
6. On the Create Purchase Order screen, make the following entries:
Confidential Page 152 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Put Doc Type as Import
Don’t Put Tick in GR Based
Mention Tax code as V0
7. For Basic Customs Duty(JCDB),CVD(JCV1),Addition Customs Duty(JADC),E-cess on CVD(JECV) E-Cess (JEDB)
Confidential Page 153 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Customs Duties in respective Condition type fields
Confidential Page 154 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Select Each Condition Type related to Customs and click this Details Button
. 8. To change the vendor for condition type select JCDB condition type and Choose on Condition detail icon located at left bottom side of your screen.
9. System will take to new Item – Conditions – Detail: screen. In this screen at right bottom of screen you can find the vendor code 60000 the main imported vendor is defaulted here. You have to replace this vendor
Confidential Page 155 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
code with respective vendors and Choose enter and green arrow to come back (F3) to condition tab of purchase order.
Confidential Page 156 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Change DS200 to DS250(appropriate vendor) for each condition types
10. Repeat the same for other condition types such as JCV1, JECV, JADC, and JEDB etc.
11. Purchase Order may be posted by Choosing on the Save icon.
Confidential Page 157 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2.2.4
Version
Result A message will be displayed stating that the purchase order was saved, with the purchase order number, please note the purchase order number.
2.2.5
Example Standard PO created under the number 3100000000.
Confidential Page 158 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2.3 Release Purchase Order 2.3.1 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
Logistics Materials Management Purchasing Purchase Order Release Individual Release
Transaction code
ME29N
Click Other Purchase Order Enter PO No
Confidential Page 159 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click This Icon to Release PR
Confidential Page 160 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click This Icon to Release
Click This Icon to Save
Confidential Page 161 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2.4 Message Output 2.4.1
Use
A Purchase Order needs to be printed for transmitting to vendor.
2.4.2
Procedure
8. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit ME9F
Transaction code
9. On the Message Output screen, make the following entries
10. Choose
to Execute.
Confidential Page 162 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
11. On screen Message Output select the appropriate Document number and perform the following:
Choose Output Message and/or Choose Display Message and/or Choose Message Detail and/or Choose Trial Printout.
Confidential Page 163 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2.5 CAPTURING BILL OF ENTRY 2.5.1
Use
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.
2.5.2
Procedure
7. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
8. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction. 9. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Choose Planned Delivery Costs
Confidential Page 164 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Amounts of the Customs Duties Manually in the Amount Column with referring to PO.
Confidential Page 165 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Field name
Description
R/ O/ C
User action and values
Transaction
Invoice
R
Select Invoice from drop down list
Header Data
Header data of Invoice
R
Defaulted by system
Basic tab
Basic information tab
R
Select basic information tab to give initial information
Invoice Date
Invoice Date
R
Enter the Vendor invoice date
Reference
Invoice reference
O
Enter the vendor invoice reference For Example USERMANUAL
Posting date
Posting Date
R
Enter the posting date of document
System will give current date as default
Amount
Invoice Amount
R
Enter invoice gross amount including taxes and duties 39.80
Amount mentioned is only an example
Currency
R
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order USD
Check box calculate tax
O
Check this tick box, system will calculate tax amount
Tax code
R
Select the tax code from drop down list V0
Bus.place/se ctn
Business place or section code
R
Enter section code if Tax deduction for source is active for this vendor
Text
Text
O
Enter text if required for reference
Payment tab
Payment tab
R
Select payment details tab
BaselineDt
Base line date for payment
R
Enter the base line date for payment
Pmnt terms
Payment terms
O
Payment terms of document, if entered will be defaulted from purchase order
Due on
Payment due on
O
Will be calculated by
Calculate tax
Confidential Page 166 of 316
Comment
Leave blank for this process
Will be defaulted if payment terms entered in PO
Grayed out
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
system Discount
Layout
Cash discount
O
Enter if cash discount is offered by vendor
Purchase order / Schedule Agreement
R
Select Purchase order / Schedule Agreement in the reference document category from drop down list
Purchase order number
R
Enter the first purchase order number generated above
Planned Delivery Costs
R
Select Planned Delivery Costs in indicator from drop down list
Layout of invoice verification
R
Select All information from drop down list
Defaulted for user
Choose Enter
10. Choose Enter to complete the document feeding part. 11. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color. 12. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.
Confidential Page 167 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
13. Choose Display Currency which will lead to small pop-up window having the company code currency and Document Currency, position the cursor on the INR to convert to Document Currency and press the details button.
Confidential Page 168 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 169 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 170 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 8. Choose Save / Post, for posting the document.
2.5.3
Result
Logistics Invoice verification document is posted.
2.5.4
Example
Document no. 5105600121created
Confidential Page 171 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2.6
Version
Goods Receipt for Imported Purchase Order
2.6.1
Use
Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general ledger accounts are also posted and stocks are updated.
2.6.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known MIGO
Transaction code
2. On the Goods Receipt Purchase Order screen, make the following entries: Field name
Description
R/ O/ C
User action and values
Goods Receipt
Goods Receipt
R
Select from drop down list for action
Inbound Delivery
Purchase Order
R
Enter the Purchase Order No.generated above 3100000000
Movement Type
Comment
101 Enter
Since this is imported purchase order and you have already done invoice verification for planned delivery cost. System will give a new popup Excise Invoice item number screen (which is not there in normal other process) asking for Commercial invoice number and year. Please enter the invoice verification document number which you have done in above 5105600792 and year 2006.
Confidential Page 172 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 173 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. Choose Enter where a small pop-up window will prompt to enter the Commercial Invoice No. and Year (i.e.,
the Invoice Verification posted for Bill of Entry)
Enter the No generated for the posting of Bill of Entry
4. After pressing Enter system will fetch all the data from the Purchase Order as shown below:
Confidential Page 174 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Whichever material is in Blue those detail will be seen in the Item detail
5. System defaults the balance quantity in Purchase Order.
Confidential Page 175 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 176 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the storage location
Confidential Page 177 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Select Item Ok and Press Enter and the Excise tab will appear both in Header and Item Level
Field name
Description
R/ O/ C
User action and values
Goods Receipt
Goods Receipt
R
Select from drop down list for action
Inbound Delivery
Purchase Order
R
input the Purchase Order number which generated above 4500000059
Movement Type
Comment
101 Enter
Document Date
Document Date
R
Enter document date
Delivery Note
in Header
O
Delivery Number from Vendor
Vendor
Vendor
R
Defaulted from purchase order
Posting Date
Posting date
R
Enter posting date
Bill of lading
Bill of lading
O
Enter bill of lading
Confidential Page 178 of 316
Grayed out
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Header text
Header text
O
Version
Enter header text
Close Header Detail data to enlarge the Detail data. Select Material tab at Detailed Data. Material
Material tab
R
Defaulted from Inbound Delivery
Grayed out
Enter the quantity you have received from vendor. As a default system will give purchase order quantity Enter the quantity as per vendor delivery challan
Quantity defaulted from Purchase Order
Select Quantity tab in Detail data. Qty in unit of entry
Quantity in unit of entry
R
Qty in delivery note
Quantity in delivery note
O
Select Where tab in Detail data. Movement type
Movement type
R
Defaulted from header screen
Stock type
Stock type
R
Plant
Plant
R
Storage location
Storage location
R
Goods Recipient
Goods Recipient
O
Defaulted from material master or purchase order Defaulted from purchase order 1000 Defaulted from Inbound delivery if entered 1010 Enter the name of person who received goods
Unloading point
Unloading point
O
Text
Text
O
Enter the text if required
Select Purchase Order tab in Detail data. Purchase Order
Purchase Order
R
Defaulted from header data
Del. completed ind.
Delivery completion indicator
O
Defaulted by system if PO Qty = GR Qty
O
Grayed out
Grayed out
Select Partner tab in Detail data. Vendor
Vendor name
For this material batch management is not active. Just for reference purpose the following data is given. Select Batch tab in Detail data.
Confidential Page 179 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
This tab will come only if material is managed in batches. Proceed with the following steps if material is batch managed only. Enter batch number as date Batch Batch number R for batch managed materials Enter vendor batch number Vendor batch Vendor batch O for reference 7. Select the Check box Item OK, after entering all the data.
You will get Excise Invoice tab at Header Data for capturing vendor excise invoice details and for posting Part I and Part II. 8. On the Excise Invoice tab at Header Data make the following entries.
Confidential Page 180 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Field name
Description
R/O/C
User action and values
Comment
Capture & Post Excise invoice
Capture & Post Excise Invoice on Excise Action
R
Choose Capture & Post Excise Invoice from drop down list
Defaulted
Excise Group
Excise Group
R
Defaulted by the system
Excise Invoice
Excise invoice
R
Enter the vendor Excise Invoice number For example: 4500000059
Excise Inv. Date
Excise Invoice Date
R
Enter the excise invoice date of vendor
BED
Basic Excise Duty
R
Defaulted from purchase order
Grayed out
AED
Additional Excise Duty
R
Defaulted form purchase order
Grayed out
SED
Special Excise Duty
R
Defaulted from purchase order
Grayed out
NCCD
NCCD
R
Defaulted from purchase order
Grayed out
ECS
Education Cess
R
Defaulted from purchase order
Grayed out
Close Header Detail data to enlarge the Detail data. Select Excise Item tab at Detailed Data (at the last). Chapter ID
Chapter ID of material
R
Defaulted by the system No action required
EI Quantity
Excise Invoice Quantity
R
Defaulted by the system from Goods Receipt quantity
Base Value
Base value of material
R
Defaulted by the system
BED
Basic Excise Duty
R
Defaulted by the system
AED
Additional Excise Duty
O
Defaulted by the system
NCCD
NCCD
O
Defaulted by the system
SED
Special Excise Duty
O
Defaulted by the system
ECS
Education Cess
O
Defaulted by the system
Please cross check the BED, ECS (CVD in this case) amount of item as per the bill of lading, legally you can not avail more than what mentioned in Vendor Excise Invoice. In case of imported purchase order in normal case system will default CVD and ECess (invoice verification made on commissioner of customs) amount as BED and ECS i.e. CENVAT amount.
Confidential Page 181 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
12. Choose Check at the top of screen. 13. Choose Post to post the document.
Confidential Page 182 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2.6.3
Result
Material document posted.
2.6.4
Example
Material document 5000000021 posted You can see account posting here
Confidential Page 183 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2.7
Version
Logistics Invoice Verification for the Materials
2.7.1
Use
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.
2.7.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction. 3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Confidential Page 184 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Select Goods /Service Items
Field name
Description
R/ O/ C
User action and values
Transaction
Invoice
R
Select Invoice from drop down list
Header Data
Header data of Invoice
R
Defaulted by system
Basic tab
Basic information tab
R
Select basic information tab to give initial information
Invoice Date
Invoice Date
R
Enter the Vendor invoice date
Reference
Invoice reference
O
Enter the vendor invoice reference For Example 1000
Posting date
Posting Date
R
Enter the posting date of document
Confidential Page 185 of 316
Comment
System will give current date as default
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Amount
Invoice Amount
R
Enter invoice gross amount including taxes and duties 100
Currency
R
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order USD
Check box calculate tax
O
Check this tick box, system will calculate tax amount
Tax code
R
Select the tax code from drop down list V0
Bus.place/se ctn
Business place or section code
R
Enter section code if Tax deduction for source is active for this vendor
Text
Text
O
Enter text if required for reference
Payment tab
Payment tab
R
Select payment details tab
BaselineDt
Base line date for payment
R
Enter the base line date for payment
Pmnt terms
Payment terms
O
Payment terms of document, if entered will be defaulted from purchase order
Due on
Payment due on
O
Will be calculated by system
Discount
Cash discount
O
Enter if cash discount is offered by vendor
Calculate tax
Version
Amount mentioned is only an example
Leave blank for this process
Will be defaulted if payment terms entered in PO
Grayed out
Hide Header data for getting full screen of items if required. Purchase order / Schedule Agreement
R
Select Purchase order / Schedule Agreement in the reference document category from drop down list
Purchase order number
R
Enter the first purchase order number generated above
Goods / service items
R
Select Goods / Service items in indicator from drop down list
Confidential Page 186 of 316
Defaulted for user
Defaulted
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Layout
Layout of invoice verification
R
Version
Select All information from drop down list Choose Enter
4. Choose Enter to complete the document feeding part. 5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color. 6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.
Choose Display Currency to change in INR
Confidential Page 187 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7. Choose Display Currency which will lead to small pop-up window having the company code currency and Document Currency, position the cursor on the INR to convert to Document Currency and press the details button.
Confidential Page 188 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 189 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9. Choose Save / Post, for posting the document.
2.7.3
Result
Logistics Invoice verification document is posted.
2.7.4
Example
Document no. 5105600122 created
Confidential Page 190 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3 Procurement of Subcontracting Materials – Business Process Procedure 3.1 Procurement of Subcontracting Materials 3.1.1 Purpose In Indian subcontracting process when you issue materials to a subcontractor, you need to keep track of what materials you have issued and when they have to be returned by subcontractor. The reason for this close monitoring has to do with Indian tax law. Under excise law 57AC, when you send materials to a subcontractor for processing, you are not required to pay any excise duty, even though the materials have left your premises. However, if the materials have not been returned to you within 180 days specified by the law, you will have to reverse any excise credit that you posted when you have purchased the materials. When you send material out of your factory premises you need to send with 57F4 Challan. In this process you are going to do the same.
3.1.2 Prerequisites The following scenario specific master data must be created for operation of this building block and subsequent dependent building blocks. •
Material Master record (Refer User Manual – Procurement of Stock Materials (Domestic))
•
Vendor Master record (Refer User Manual – Procurement of Stock Materials (Domestic))
•
Purchasing Info Record (Optional) Ensure that Sub-Contracting as Info Category. (Refer User Manual – Procurement of Stock Materials (Domestic))
•
CIN Master Data (Refer User Manual – Procurement of Stock Materials (Domestic)) o o
Chapter IDs Material ID and chapter ID combination (Ensure Sub-Contract check box is selected for
the Materials that provided to vendor) o o o o o
CENVAT Determination Vendor Excise Details Excise Indicator for Plants Excise Indicator for Plant and Vendor Excise Tax Rates
Confidential Page 191 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.2 Creation of Subcontracting Purchase Order 3.2.1 Use A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to goods receipt and invoice verification processes. The purchase order is a commitment to a vendor for a given subcontracting activity, in a specified quantity at a predetermined price and delivery date.
3.2.2 Prerequisites Components stock should be available for providing to subcontracting vendor.
3.2.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known ME21N Transaction code
Confidential Page 192 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
2. On the Create Purchase Order screen, make the following entries: Select ZSC Document Type for Subcontracting Order
Enter L as Item Category for Sub-Contracting Procurement
Click here to enter Bill of components that are supplying to Subcontractor
Confidential Page 193 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
After filling the above data, choose on Material Data tab at item Details screen. There you will find a new icon called Components, you have to choose on that icon to give the components list which you are likely to transfer post to vendors and give the flowing inputs. 3. Click on the Components or Explode BOM and enter the materials that had to be sent:
4. Choose on Green Arrow or F3 to come back to main purchase order screen. 5. Ensure appropriate tax code have been entered for both the line items (V0 – Nil Tax for Sub-Contracting Item)
Confidential Page 194 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Ensure Taxcode V0 for Sub-Contracting Item and click on the Taxes to view the tax calculation
Confidential Page 195 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6. The Purchase Order may be posted by choosing on the Save icon.
3.2.4 Result A message will be displayed stating that the purchase order was saved, with the purchase order number.
3.2.5 Example Standard PO created under the number 2400000000
Confidential Page 196 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.3 Message Output 3.3.1 Use A Purchase Order needs to be printed for transmitting to vendor.
3.3.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit ME9F
Transaction code
2. On the Message Output screen, make the following entries
3. Choose
to Execute.
4. On screen Message Output select the appropriate Document number and perform the following:
Confidential Page 197 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Choose Output Message and/or Choose Display Message and/or Choose Message Detail and/or Choose Trial Printout.
Confidential Page 198 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.4 Transfer of Components to Subcontractor 3.4.1 Use The Nature of subcontracting purchase order is that company will provide components to subcontractor. This process describes how to transfer post materials to subcontractor.
3.4.2 Prerequisites Sufficient stocks of components should be available for making transfer posting.
3.4.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Transfer posting MB1B
Transaction code
2. On the Enter Transfer Posting: Initial Screen, make the following entries: Field name Document Date Posting Date Movement Type Plant Storage Location
Description Document Date
R/ O/ C R
User action and values Input date
Posting Date Movement Type
R R
Input date 541
Plant Storage location
R R
1000 1010
Press To Purchase Order
Confidential Page 199 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.
Choose on To Purchase Order icon on the top of the screen or choose F9 on key board. System will give new popup screen asking for purchase order number. Give the 45000000## purchase order number and choose enter to continue.
4. 5.
System will display components from purchase order with quantities Choose only the Material that you are sending and enter the Storage Location from which it has to be issued.
Confidential Page 200 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
6.
Choose on Adopt + Details icon or F6.
7. 8.
Choose Enter if required the quantity of components can be changed. Choose Save icon or Control + S to post the document.
3.4.4 Result A message will be displayed stating that the document posted.
Confidential Page 201 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.4.5 Example Material document 4900000039 posted.
3.5 Creation of Subcontracting Challan 3.5.1 Use It is statutory requirement to send the components to subcontractor with 57F4 Challan.
3.5.2 Prerequisites • • • •
Select the Sub-Contracting Material in Material and Chapter ID Combination of the Excise Master (J1ID) for the sending Material. Ensure that the details of the receiving Material maintained in the Excise Master (J1ID). CENVAT Determination of the Excise Master (J1ID) Maintained for the both sending and receiving Material. Ensure that the Assessable value for the sending material is maintained in the Excise Master (J1ID)
3.5.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP User menu Indirect Taxes Procurement CIN Menu Subcontracting Challans Create Transaction code
J1IF01
Confidential Page 202 of 316
Subcontracting
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2. On the Subcontracting Challan - Create, make the following entries: Field name Material Doc. Mat. Doc. Year Excise Group Series Group
3.
Description Material document number Material document year Excise Group Series Group
R/ O/ C R R R R
User action and values 4900000039 2006 10 W3
Comment Appropriate Appropriate Appropriate
Choose Enter to continue, system will take new Subcontracting Challan – Create screen, make the following entries:
Field name Select Posting tab Posting date & time
Description
R/ O/ C
User action and values
R
Print Immediately
Posting date and time Print Immediately
Input date and time of material removal Check this box if you want challan printout immediately.
Select Overview Tab Preprinted no
Preprinted number
O
O
Enter pre-printed number if you have
Confidential Page 203 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
4.
Save challan by choosing on Save icon or Control + S.
3.5.4 Result A message will be displayed stating that the document posted.
3.5.5 Example Subcontracting Challan 000010001 2008; Series Group B1 successfully created.
Confidential Page 204 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
3.6
Version
Printing of Subcontracting Challan
3.6.1 Use It is statutory requirement to send the components to subcontractor with 57F4 Challan.
3.6.2 Procedure Access the transaction choosing one of the following navigation options: SAP User menu Indirect Taxes Procurement CIN Menu Subcontracting Challans Change Transaction code
J1IF11
Confidential Page 205 of 316
Subcontracting
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click the Print Immediately Tab
Press Save Icon
Confidential Page 206 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click the Print Immediately Tab
Press Enter
Confidential Page 207 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Click the Icon to be the Print Preview of the Challan
Execute the Print to Get Print Out.
Confidential Page 208 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.7 Goods Receipt for Purchase Order 3.7.1 Use Normally Goods are received from the Vendor as a result of a Purchase Order at the receiving plant
3.7.2 Prerequisites Purchase Order
3.7.3 Procedure 9. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known Transaction code
MIGO
10. On the Goods Receipt Purchase Order screen, make the following entries:
Enter the Purchase Order No and Press Enter
11. After pressing Enter system will fetch all the data from the Purchase Order as shown below:
Confidential Page 209 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
12. First do the posting for the Sub-Contracting Material.
Whichever material is in Blue those detail will be seen in the Item detail
13. System defaults the balance quantity in PO, change the quantity to the received quantity if it is different from defaulted quantity:
Confidential Page 210 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
14. Ensure that the Movement Type is 101.
Confidential Page 211 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 212 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Select Item Ok and
Confidential Page 213 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Field name
Description
R/ O/ C
User action and values
Goods Receipt
Goods Receipt
R
Select from drop down list for action
Purchase Order
Purchase Order
R
input the PO number which generated above 4500000054
Movement Type
Version
Comment
101 Enter
Document Date
Document Date
R
Enter document date
Delivery Note
in Header
O
Delivery Number from Vendor
Vendor
Vendor
R
Defaulted from purchase order
Posting Date
Posting date
R
Enter posting date
Bill of lading
Bill of lading
O
Enter bill of lading
Header text
Header text
O
Enter header text
Confidential Page 214 of 316
Grayed out
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Close Header Detail data to enlarge the Detail data. Select Material tab at Detailed Data. Material
Material tab
R
Defaulted from Purchase Order
Grayed out
Enter the quantity you have received from vendor. As a default system will give purchase order quantity Enter the quantity as per vendor delivery challan
Quantity defaulted from Purchase Order
Select Quantity tab in Detail data. Qty in unit of entry
Quantity in unit of entry
R
Qty in delivery note
Quantity in delivery note
O
Select Where tab in Detail data. Movement type
Movement type
R
Defaulted from header screen
Stock type
Stock type
R
Plant
Plant
R
Goods Recipient
Goods Recipient
O
Defaulted from material master or purchase order Defaulted from purchase order 1000 Enter the name of person who received goods
Unloading point
Unloading point
O
Text
Text
O
Enter the text if required
Select Purchase Order tab in Detail data. Purchase Order
Purchase Order
R
Defaulted from header data
Del. completed ind.
Delivery completion indicator
O
Defaulted by system if PO Qty = GR Qty
O
Grayed out
Grayed out
Select Partner tab in Detail data. Vendor
Vendor name
For this material batch management is not active. Just for reference purpose the following data is given. Select Batch tab in Detail data.
This tab will come only if material is managed in batches. Proceed with the following steps if material is batch managed only.
Confidential Page 215 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Batch
Batch number
R
Vendor batch
Vendor batch
O
Enter batch number as date for batch managed materials Enter vendor batch number for reference
15. Select the Check box Item OK, after entering all the data.
NCCD
NCCD
O
Defaulted by the system
SED
Special Excise Duty
O
Defaulted by the system
ECS
Education Cess
O
Defaulted by the system
Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other information is defaulted by the system. Hence, no action required by the user.
5. Choose Check at the top of screen. 6. Choose Post to post the document.
Confidential Page 216 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
3.7.4 Result Material document posted.
3.7.5 Example Material document 5000000028 posted, You can see accounting Entries
Confidential Page 217 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.8 Reconciling Subcontracting Challan 3.8.1 Use After making Goods Receipt the GR has to be reconciled with the challan sent to subcontractor.
3.8.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP User menu Indirect Taxes Procurement Subcontracting CIN Menu Subcontracting Challans Reconcile Quantity Transaction code
J1IFQ
As we have refered challan During Goods receipt here we are getting following message, If you have not refred challan during Gr following is the Process
Confidential Page 218 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2. On the Quantity reconciliation for Subcontracting Challan screen, make the following entriees.
Field name
Description
R/ O/ C
User action values
Material Document
Goods Receipt number
R
5000000344
Mat. Doc. Year
Year of document
R
2006
Year
Subcontacting challan year
R
2006
Chalan No
Subcontacting challan No
R
000000031
document
and
Comment
Choose on Reconcile icon or F8 to go reconciliation screen. 3. System will take you to new Quantity reconciliation for Subcontracting Challans. 4. Here on this you can see system display items from Goods Receipt at top and items from challan at bottom of screen.
5. Here you need to allocate the components consumed in GR stage are reconciled with challan to do this, choose on Allocate based on FIFO icon in the middle of screen with calculator icon. 6. Or you can do allocation by entering manually also in respective line items at bottom, where Assigned quantity filed is located in white color.
Confidential Page 219 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 7. After assignment save the document by choosing Save icon or choose Control + S
3.8.3 Result Material document was successfully reconciled.
3.8.4 Example Material Document 5000000028, 2008 was successfully reconciled.
Confidential Page 220 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.9 Completing/Reversal/Re-credit Subcontracting Challan 3.9.1 Use This transaction is basically used to complete the challan if you have reconciled as stated above step. There may be cases subcontractor may not able to supply within stipulated 180 days limit then in this case also same transaction is used for reversal of challan or re-crediting the amount.
3.9.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP User menu Indirect Taxes Procurement Subcontracting CIN Menu Subcontracting Challans Complete/Reverse/Recredit
J1IF13
Transaction code
2. On the Subcontracting Challan – Complete/Reverse/Recredit screen, make the following entries: Field name
Description
R/ O/ C
User action and values
Chalan No
Subcontacting challan No
R
0000000031
Excise year
Document year
R
2006
3. Choose enter to go to inside the challan document.
4. Select the radio button Complete Challan and. 5. Save the document by choosing Save icon or choose Control + S.
Confidential Page 221 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3.9.3 Result Subcontracting challan successfully completed.
3.9.4 Example Subcontracting Challan 0000001 2008; Series Group B1 successfully completed.
3.10 Logistics Invoice Verification for Subcontracting Material 3.10.1 Use In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.
3.10.2 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction. 3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries: 4. Choose only the Subcontracting material to post the document:
Confidential Page 222 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Field name
Description
R/ O/ C
User action and values
Transaction
Invoice
R
Select Invoice from drop down list
Header Data
Header data of Invoice
R
Defaulted by system
Basic tab
Basic information tab
R
Select basic information tab to give initial information
Invoice Date
Invoice Date
R
Enter the Vendor invoice date
Reference
Invoice reference
O
Enter the vendor invoice reference For Example USERMANUAL
Posting date
Posting Date
R
Enter the posting date of document
System will give current date as default
Amount
Invoice Amount
R
Enter invoice gross amount including taxes and duties 19.50
Amount mentioned is only an example
Currency
R
Enter the currency in which the bill is presented by vendor, if not entered by
Confidential Page 223 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
user system will default the document currency from purchase order INR Calculate tax
Check box calculate tax
O
Check this tick box, system will calculate tax amount
Tax code
R
Select the tax code from drop down list V0
Bus.place/se ctn
Business place or section code
R
Enter section code if Tax deduction for source is active for this vendor
Text
Text
O
Enter text if required for reference
Payment tab
Payment tab
R
Select payment details tab
BaselineDt
Base line date for payment
R
Enter the base line date for payment
Pmnt terms
Payment terms
O
Payment terms of document, if entered will be defaulted from purchase order
Due on
Payment due on
O
Will be calculated by system
Discount
Cash discount
O
Enter if cash discount is offered by vendor
Leave blank for this process
Will be defaulted if payment terms entered in PO
Grayed out
Hide Header data for getting full screen of items if required.
Layout
Purchase order / Schedule Agreement
R
Select Purchase order / Schedule Agreement in the reference document category from drop down list
Purchase order number
R
Enter the first purchase order number generated above
Goods / service items
R
Select Goods / Service items in indicator from drop down list
Layout of invoice verification
R
Select All information from drop down list Choose Enter
5. Choose Enter to complete the document feeding part.
Confidential Page 224 of 316
Defaulted for user
Defaulted
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color. 7. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.
10. Choose Save / Post, for posting the document.
Confidential Page 225 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
3.10.3 Result Logistics Invoice verification document is posted.
3.10.4 Example Document no. 5105600132 created, Account postings are following
Confidential Page 226 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5. Procurement of External Services: Business Process Procedure 5.1 Procurement of External Services – Procurement Process 5.1.1 Purpose External Services Management is an application component within Materials Management Module. It covers from creation of service master, bid invitation, order placements process, entering and accepting services and finally invoice verification process.
5.1.2 Prerequisites The following scenario specific master data must be created for operation of this building block and subsequent dependent building blocks. •
Service Master record o
•
AMC Charges for Testing Machine
Vendor Master record
Refer the document of “Procurement of Stock Materials”
Confidential Page 227 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5.2 Creating Service Master 5.2.1 Use The service master record counts as part of the master data within External Services Management and serves as a source of data for you to draw upon when creating services. This enables you to save time and reduces the frequency of errors, since you need only enter the complete service descriptions in the service master record once.
5.2.2 Procedure 8. Access the transaction choosing one of the following navigation options: SAP R/3 Menu Logistics Materials Management Service Master Service Service Master Transaction code
AC03
9. On the Display Service screen, make the following entries:
10. Click on Create new service icon or press F5 (white paper icon) to create new service master. 11. Then you will get Create Service Master Record screen, make the following entries:
No Need to Enter as Internal No will be generated and Enter the Short Text only
Confidential Page 228 of 316 Enter the Service Category and Base Unit of Measure accordingly
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Field name
Description
R/ O/ C
User action and values
Comment
Service Number
Service master record (internally assigned)
R
You can see %_1 will be displayed on this field, leave it as blank. System will assign internal service number
Leave blank
Service description
R
Service Category
Service Category
R
Base unit of Measurement
Base unit of Measurement
Annual Mait. Contract for Input the value Testing M/C. Blocking of service procurement can be done Service:ALL by entering appropriately here Select from drop complete down
R
AU for Activity Unit
Basic Data
Conversion can be maintained here
Mat/srv.grp
Material Group or Service Group
R
91
Division
Division
O
Valuation class
Valuation class
R
3200
This is free input place. You can fully input the service specification.
O
Annual Maintenance Contract for Testing Machine.
Long Text
12. Press enter to complete the entries. 13. Press Save icon or Control + S to save the entries.
5.2.3 Result Service Master Record is created.
Confidential Page 229 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5.3 Creating Purchase Requisition 5.3.1
Use
A Purchase Requisition is created to indicate purchase department to procure materials or services with details like how much quantity is required, when required. Generally it is created automatically for Raw materials and Packing Materials through MRP Run and Spares and Service related to Plant Maintenance Purchase Requisition is generated automatically from Plant maintenance Order. In this process Purchase Requisition is created against Quantity Contract created in above step 1.1.4 with exact delivery / requirement date. This transaction is optional for the process.
5.3.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
Logistics Materials Management Purchasing Purchase Requisition Create
Transaction code
ME51N
3. On the Create Purchase Requisition screen, make the following entries:
Confidential Page 230 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the A/c Assignment Category as K for Cost center and Item Category D for Services
Enter the Short Text
Enter the appropriate Material Group Plant and Purchasing Group
When Item Category D is enterer one new tab in the Item Detail Services is generated to enter the Service No.
Confidential Page 231 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Enter the Service No, Quantity and Gross Price and press Enter
4. After pressing enter system shows a small pop-up window where respective G/L Account and Cost Center to be entered.
Confidential Page 232 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the appropriate G/L Account and Cost Center
Confidential Page 233 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter the Desired Vendor if Vendor is known to the person who is creating PR
5. Press
or Ctrl+S to Save the Purchase Requisition.
Confidential Page 234 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
5.3.3
Result
Purchase Requisition is created,
5.3.4
Example
Purchase requisition number 0010000180 created.
Confidential Page 235 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5.4 Assign and Process Purchase Requisition 5.4.1
Use
c) This section explains the functions provided by the SAP System for converting requisitions into external purchasing documents (purchase orders, contract release orders, scheduling agreement delivery schedules, RFQs), and the processing options thereby available to you: •
Assigning means defining the desired source for each purchase requisition item o Further processing involves generating lists of requisitions that have been assigned or flagged as outlined above, and the subsequent creation of RFQs, purchase orders, or lines of delivery schedules under scheduling agreements.
5.4.2
Procedure
6. Access the transaction choosing one of the following navigation options: SAP R/3 menu Transaction code
Logistics Materials Management Purchasing Purchase Requisition Follow-On Functions Assign and Process ME57
7. The assignment of sources to and further processing of purchase requisitions are two distinct functions. You can choose whether you wish to perform the functions in two separate steps or in just one.
Confidential Page 236 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 8. Below are the Selection Parameters to restrict the process of PO from PR
1. Enter the appropriate Purchasing Group 2. Enter the Scope of List as B1 for PR generated through MRP Run and A for remaining PR 3. Enter the appropriate Plant 4. Enter the Item category as D
1. Select the Assigned Purchase Requisition (For Spares PR normally the End User may have entered the Vendor in the PR) 2. Select the appropriate Check boxes for Processing the PR
9. Press
or F8 to enter into the next screen.
1. If Source List is available click this button
For Manual Assignment of source click this Icon
Confidential Page 237 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1. Select the check boxes required PR which are to be converted in to Pos.
Confidential Page 238 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Click SAVE Icon. Source has been assigned for this Requisition
5.4.3 Result The source is assigned to PR and can be processed for PO.
5.5. For Releasing Purchase Requisition Refer User Manual for Stock Procurement
5.6 Purchase Order 5.6.1 Use A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. This transaction is mandatory for the process.
Confidential Page 239 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Please ensure that Purchase Order Value does not exceed specified value and if the purchase order value crosses this limit a release procedure is applied on this purchase order. To release the Purchase Order go to ME28 for collective release and ME29N for individual release.
5.6.2 Prerequisites
1. Before creating purchase order if this vendor is subject to Tax Deduction at Source (TDS) or with holding tax please ensures that necessary entries in vendor master is updated.
5.6.3 Procedure 6. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known ME21N Transaction code
7. If you want create purchase order with reference to the purchase requisition, on item details screen enter the purchase requisition number and item number at Purch. Req. field. System will automatically adopt all the data from requisition.
Click the Purchasing Requisitions and Press Adopt
Select this check box if Invoice Verification is done after Service Entry Sheet
Confidential Page 240 of 316
Press this button to view the Tax Calculation
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Condition Record for JSVD and JEC4 should be Maintained in FV11 with Material Group/Plant Combination.
Select Invoice tab Tax code
Enter Tax code
R
S1
Select S1 tax code
Since the procurement services covered with service tax of 10% (for example only, check for legal requirement), it is advised to select V1 tax code. Jurisdiction Jurisdiction code R Will be defaulted from plant
Confidential Page 241 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 code
Version
parameters
Depending on for which plant you are procuring the services system will select Jurisdiction code. In system the following Jurisdiction codes were configured IN00 – Central GR-based IV Goods Receipt based O Tick this check box invoice verification Srv.-based IV Service based invoice O Tick this check box If Invoice verification Verification will be done after the Service Entry sheet
8. The Purchase Order may be posted by Choosing on the Save button or Choose Control + S for saving.
5.6.4 Result Purchase Order is created.
Confidential Page 242 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
5.6.5 Example Standard PO created under the number 4500000062.
5.7 For Releasing Purchase Order Refer User Manual of Stock Procurement 5.8 Message Output 5.8.1
Use
A Purchase Order needs to be printed for transmitting to vendor.
5.8.2
Procedure
14. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit Transaction code
ME9F
15. On the Message Output screen, make the following entries
Confidential Page 243 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
16. Choose
to Execute.
17. On screen Message Output select the appropriate Document number and perform the following:
Confidential Page 244 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Choose Output Message and/or Choose Display Message and/or Choose Message Detail and/or Choose Trial Printout.
5.9 Creation and Acceptance of Service Entry Sheet 5.9.1
Use
Confidential Page 245 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
The services actually performed (work actually done) by a service vendor are recorded in a Service Entry Sheet with reference to the purchase order.
5.9.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 Menu Logistics Materials Management Service Entry Sheet Maintain Transaction code
ML81N
2. On the Service Entry Sheet screen, make the following entries:
3. Click on Other Purch. Orders icon or Shift + F5, system will popup new screen.
Confidential Page 246 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
4. In this screen against Purchase Order field give the purchase order number which is created in above steps and press enter to continue.
Confidential Page 247 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5. You will get new Service Entry Against Purchase Order 6. Here on this screen click Create Entry Sheet (white paper icon) or Shift + F1 to get new entry sheet. 7. System allocates service entry sheet number internally and you will get the number on screen.
Confidential Page 248 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press Service Selection and a dialog box appears
8. System will give a popup screen with purchase order number on that, press enter to continue.
Confidential Page 249 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9. Select the line item 10 and click on Services or F9 (Adopt services) icon on top of screen.
Confidential Page 250 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
10. For example the following screen name will come:
Confidential Page 251 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
11. You can observe the system copied the service line item from purchase order with open item quantity i.e. 1 AU.
12. Change the quantity as per your requirement
Confidential Page 252 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 253 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
13. With this the basic information of service entry sheet is fully completed. As per the requirement you can fill other fields also if required. 14. To accept the service click on Accept icon or Control + F1 (Green flag icon).
Press Green Colour Flag Button
15. You can see the traffic light is become Yellow color. That means it is ready to save the service entry sheet.
Confidential Page 254 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
The colour changes from red to yellow and Press Save
16. Press
or Ctrl+S to save the document.
Confidential Page 255 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
5.9.3
Result
A message indicates that the service entry sheet saved, acceptance document posted.
5.9.4
Example
Service entry sheet saved, acceptance document 5000000134 posted.
Confidential Page 256 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
5.10 Logistics Invoice Verification 5.10.1
Use
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.
5.10.2
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction. 3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Confidential Page 257 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Field name
Description
R/ O/ C
User action and values
Transaction
Invoice
R
Select Invoice from drop down list
Header Data
Header data of Invoice
R
Defaulted by system
Basic tab
Basic information tab
R
Select basic information tab to give initial information
Invoice Date
Invoice Date
R
Enter the Vendor invoice date
Reference
Invoice reference
O
Enter the vendor invoice reference For Example USERMANUAL
Posting date
Posting Date
R
Enter the posting date of document
System will give current date as default
Amount
Invoice Amount
R
Enter invoice gross amount
Amount
Confidential Page 258 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0 including taxes and duties 1122.40 Currency
R
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order INR
Check box calculate tax
O
Check this tick box, system will calculate tax amount
Tax code
R
Select the tax code from drop down list S1
Bus.place/se ctn
Business place or section code
R
Enter section code if Tax deduction for source is active for this vendor
Text
Text
O
Enter text if required for reference
Payment tab
Payment tab
R
Select payment details tab
BaselineDt
Base line date for payment
R
Enter the base line date for payment
Pmnt terms
Payment terms
O
Payment terms of document, if entered will be defaulted from purchase order
Due on
Payment due on
O
Will be calculated by system
Discount
Cash discount
O
Enter if cash discount is offered by vendor
Calculate tax
Version
mentioned is only an example
Leave blank for this process
Will be defaulted if payment terms entered in PO
Grayed out
Hide Header data for getting full screen of items if required.
Layout
Purchase order / Schedule Agreement
R
Select Purchase order / Schedule Agreement in the reference document category from drop down list
Purchase order number
R
Enter the first purchase order number generated above
Goods / service items
R
Select Goods / Service items in indicator from drop down list
Layout of invoice
R
Select All information from
Confidential Page 259 of 316
Defaulted for user
Defaulted
Materials Management User Manual For Duro Shox Pvt Limited 1.0 verification
Version
drop down list Choose Enter
4. Choose Enter to complete the document feeding part. 5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color. 6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.
Confidential Page 260 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
11. Choose Save / Post, for posting the document.
5.10.3
Result
Logistics Invoice verification document is posted.
5.10.4
Example
Document no. 5105600795 created
Confidential Page 261 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6 Asset Procurement – Business Process Procedure. 6.1 Purchase Order 6.1.1 Use A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date. This transaction is mandatory for the process.
Prerequisites
1. Before creating purchase order if this vendor is subject to Tax Deduction at Source (TDS) or with holding tax please ensures that necessary entries in vendor master is updated. 2. Asset Management Module Active.
6.1.2 Procedure 7. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known ME21N Transaction code
Confidential Page 262 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Enter Account Assignment ‘A’ and Short text of the Assest
Enter PO Qty,Net Price,Currency, Material Group
Enter Code V1
Confidential Page 263 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
1. Enter the respective Asset No.
Enter the Asset No.
Confidential Page 264 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. Click Taxes Tab to View the Tax Details IIN FV11 maintain Condition record for respective Tax Conditions with Material Group/Plant combination.
3.Click Save Button to Save the PO.
Confidential Page 265 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
6.1.3 Result Purchase Order Created with No. 230000000.
6.2 Release of Purchase Order 6.2.1 Procedure For Release of Purchase order Please refer Stock Procurement Manual.
Confidential Page 266 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6.3 Goods Receipt for Purchase Order 6.3.2 Use Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general ledger accounts are also posted and stocks are updated.
6.3.3 Prerequisites Purchase Order
6.3.4 Procedure 16. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known Transaction code
MIGO
Confidential Page 267 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Select Only Capture Excise Invoice
Save the Document.
Confidential Page 268 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
6.2.3 Result Material Document 500000029 Posted.
6.4 Post Excise Invoice 6.4.1 Procedure Access the transaction choosing one of the following navigation options: SAP R/3 menu CIN Easy Screen(J1ILN) Indirect Taxes Procurement Incoming Invoice Central Processing ->Post Excise Invoice Transaction code
J1IEX
Confidential Page 269 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click Simulate Cenvat.
Confidential Page 270 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click Post Cenvat.
Click Continue
6.4.2 Result Excise Invoice Posted.
Confidential Page 271 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6.5 Logistics Invoice Verification 6.5.1 Use In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.
6.5.2 Procedure 4. Access the transaction choosing one of the following navigation options: SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice Transaction code
MIRO
Confidential Page 272 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click Simulate
Confidential Page 273 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click Save.
Confidential Page 274 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
6.5.3 Result Invoice Document 5105600133 Posted.
Confidential Page 275 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7 Excise Periodic Processing – Business Process Procedure 7.1 Excise Periodic Processing 7.1.1 Purpose Excise Periodic Processing’s that are to be carried out at end of a period. Excise Periodic Processing helps you prepare and carry out the activities required for day-end or month-end and year-end closing. •
TR6 Challan Posting with PLA Register Updation
•
Utilization of CENVAT
•
RG1 Register updation
•
Proforma for Monthly Return under Rule 7 of the Cenvat Credit Rules, 2001
7.1.2 Prerequisites Before execute business scenarios, you need to post the business processes transactions from other scenarios. As part of the integrated scenario, this scenario needs several User Manuals as prerequisites to demonstrate these include: •
Production Planning and Discrete Manufacturing
•
Procurement of Stock Materials
•
Sales and Distribution
Confidential Page 276 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7.2 Excise Report - CENVAT Register 7.2.1 Use Details to submit an Annexure to the Excise Authorities as a Monthly Return Under Rule 57AE of the Central Excise Rules, 2001. CENVAT Register displays input credit details for Raw materials or Capital Goods. This report can be generated detailed as Annexure or summary as Abstract.
7.2.2 Prerequisites User must be assigned the Indian Localization menu.
7.2.3 Procedure 9. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → CENVAT Register Transaction code
J2I9
10. On the Proforma for Monthly Return Under Rule 57AE of the Central Excise Rule screen, make the following entries:
Select the Radio Button for Capital Goods / Inputs to display Annexure / Abstract
Confidential Page 277 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
R/ O/ C
User action and values
Version
Field name
Description
Comment
Company Code
Company code
R
1000
Excise Group
Excise Group for which ID for which CENVAT Register is being generated
R
10
Posting Date
Posting date range
R
Annexure
Output to be generated Annexure or Abstract
C
Select this radio button if the out put is being generated for Annexure
At time you can generate an Annexure or Abstract
Abstract
Output to be generated Annexure or Abstract
C
Select this radio button if the out put is being generated for Abstract
At time you can generate an Annexure or Abstract
Inputs
Annexure to be generated for Input materials or Capital Goods
C
Select this radio button if the out put Annexure is being generated for Input Materials
At time you can generate an Annexure for Input materials or Capital Goods
Capital Goods
Annexure to be generated for Input materials or Capital Goods
C
Select this radio button if the out put Annexure is being generated for Capital Goods
At time you can generate an Annexure for Input materials or Capital Goods
The date from the beginning of the month to end of the month
Confidential Page 278 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
11. The out put can be saved into a local file or printed by using the print options.
7.2.4 Result You are able to generate Proforma for Monthly Return Under Rule 57AE of the Central Excise Rule.
Confidential Page 279 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7.3
Version
Excise Register Updation
7.3Updation of RG1 Register 7.3.1 Use RG1 register maintained at Manufacturing Plants for excisable finished goods. The register shows goods movements from the factory to a store and stores to customer, specifically for excisable finished goods. The R/3 System generates all the necessary entries in the register. This report only creates register entries for goods movements that have not already been entered. It does not create duplicate entries. Using this activity, you can also update the goods issue into RG23A Part I and RG23C Part I, Register by select the radio button option in the Registers.
7.3.2 Prerequisites To extract the data to RG1 Register, Material numbers has to be maintained in the table J_2IRG1BAL - Opening/Closing balance table for RG1.
7.3.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Update RG23A/C Issues and RG1 Transaction code
J1I5
Confidential Page 280 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2. On the Update of Registers RG1 and RG23(Part1) screen, make the following entries:
Select appropriate Classification
Select the Radio Button for RG1 / RG23A Part 1 / RG23C Part 1 Updation
Field name
Description
R/ O/ C
User action and
Confidential Page 281 of 316
Comment
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
values Company Code
Company Code
R
1000
Plant
Plant – for which RG1 Register is being maintained
R
1000
Excise Group
Excise Group for which RG1 register is being maintained
R
10
Material Document Number
Material document number
O
Based on the updation criteria enter values
Document Year
Material document year
O
Material document year
Posting Date
Date of Material document Posted
R
Movement Type
Movement Type used for posting the materials
O
Storage Location
Storage location used for posting the material movements
O
Material
Material number to update the RG1 Register
O
Document Date
Document date of the material document
O
Batch
Batch number of the materials
O
Stock Type
Stock Type declared
O
Rule
Excise Classification Rule
O
Classification
Pre-defined Classifications
R
Enter the Material Document Posting Date
IIM For updating of goods receipts from Manufacturing plant use RMA For updating of Goods issue, i.e. Removal from factory on payment of duty for home use –
Confidential Page 282 of 316
Receipts RMA- Receipt from manufacture ROP-Receipt from outside under any other provision Issues IDH-Removal from factory on payment of duty for Home use IDE-Removal on payment of duty for
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
IDH
export under no bond IWE-Removal without payment of duty for export under bond IWT-Removal without payment of duty for transfers IWO-Removal without payment of duty for other purpose
RG23/ RG1
RG23 / RG1 updation date
R
Select the appropriate radio button to update the RG1 Register. Please select the document entry date radio button
Date to be considered by the system for updation of RG1 Register Document Entry date Document posting date System date
Registers
Register to update
R
Select the RG23A radio button to update the RG1 Register,
By using this Transaction you can update the following Registers RG23A Part1 RG23C Pat1 RG1
Please press enter and ignore any messages. Update the Receipts to RG1 Register and then update the issue to RG1 Registers. Follow the sequence of transactions. You can update the RG1 Register by selecting material document header values or Material document line item level details or both together. The following Classification codes need to be used while updating the Excise Registers: Register Type Goods issues Goods receipts RG 23A
IIM
ROP
IPD IWD RG23C
IIM
ROP
IPD IWD RG1
IDH
RMA
IDE
ROP
Confidential Page 283 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0 IWE IWT IWO
3. System will display the ‘Update of Registers RG1 and RG23 (Part1’) screen: Displays all the line items to meet the selection criteria to update the RG1 Register.
Select Check Boxes for which Updation to be
4. Select the line items which needs to be updated to RG1 Register by selecting the check box at the beginning of the each line item
Confidential Page 284 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Press Simulate
5. Simulate the selection by using the Simulate function or use Shift+F10 to simulate the selection
Confidential Page 285 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6. System will display the selection Green or Red Traffic lights. The line items which can be updated will be displayed with Green Traffic Lights and the line items which can not be updated will be displayed with Red Traffic Lights.
7. After selecting the right documents select the line item and use the Create button to update the RG1 Register or use CTRL+Shit+F11 to make register entry.
Confidential Page 286 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Processing over for 3 records
7.3.4 Result Processing over for records
Confidential Page 287 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7.4 RG1 Register Extraction 7.4.1 Use This step needs to be performed in order to create the RG1 details into the respective tables.
7.4.2 Prerequisites You have to complete the update of RG1 Register before performing this step.
7.4.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Extract Transaction code
J2I5
2. On the Excise Registers Extraction screen, make the following entries:
Choose Execute
Confidential Page 288 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Field name
Description
R/ O/ C
User action and values
Excise Group
Excise group for which RG1 Register being generated
R
10
State Date
Starting date of Extraction
R
Starting date of data to be extracted for RG1 registers
End Date
Ending date of Extraction
R
Ending date of data to be extracted for RG1 registers
Selection Registers
Mass extraction of data to all registers
R
Select the radio button Select Any Register option
Select individual Registers
Selection of individual register
R
Activate the RG1 Check box to extract the RG1 Register
Display Last Extracted dates
Displays the previously upto what date the register has been extracted for information
O
Confidential Page 289 of 316
Version
Comment
User can generate all the registers together or individual register wise
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. Click on execute icon or Press F8 or Program Execute
Press Yes which appears in the Dialog
4. If the RG1 Register is being generated for the Period First Time, system will execute the report and display the pop-screen with Register name and Green Tick mark, if it is successfully extracted, otherwise it will show the Red Cross.
Confidential Page 290 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7.4.4 Result RG1 data has been extracted Using this activity, you can also extract the following Excise Registers in addition to RG1. • RG23A Part I • RG23A Part II • RG23C Part I • RG23C Part II • PLA In the Registers select option, if you select All registers, the system will create an extract for all registers. If you only want to create an extract for specific registers, select Select any register and then the registers that you want to extract.
Confidential Page 291 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7.5 RG1 Register Print Utility 7.5.1 Use The objective of this process is to print the RG1 Register or to display on the screen.
7.5.2 Prerequisites The data must be extracted to the RG1 Register for the period to which RG1 Register need to be printed.
7.5.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
Country India User Menu → Indirect Taxes → Registers → Excise Tax → Print Utility program
Transaction code
J2I6
2. On the Print Excise Registers screen, select the RG1 Radio button to print the RG1 Register.
Choose
Confidential Page 292 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
3. Click on Execute icon or Press F8 or Program Execute 4. On the Print RG1 Register screen, make the following entries:
Choose
Field name
Description
Excise Group
Excise group for which RG1 Register is being generated
Start Date
End Date
R/ O/ C
User action and values
Comment
R
10
Enter the Excise Group
Starting date of the period for which currently RG1Register is being generated
R
For example 01.09.2005
Starting Date
Ending date of the period for which currently RG1Register is being generated
R
For example: 29.09.2005
Ending Date
5. Click on Execute icon or Press F8 or Program Execute
6. System will display the Print parameters maintenance screen assign the out put device name and select the Print Preview option. System will display the output on the screen.
Confidential Page 293 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7. See the output on the screen and based on the requirement print the output using Ctrl + P option or through menu Text Print.
Confidential Page 294 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
7.5.4 Result RG1 Register ready to print or you can see on the screen. Using this activity, you can also view or print the following Excise Registers in addition to RG1 • RG23A Part I • RG23A Part II • RG23C Part I • RG23C Part II • PLA You have to print or see the registers one after another.
8. PLA Register Extraction 8.1 PLA Register Extraction 8.1.1 Use This step needs to be performed in order to extract the data relating to PLA Register to respective tables.
8.1.2 Prerequisites The following process has been executed, if any transactions took place during the period of PLA register extraction for payment of CENVAT and Sale of goods • •
TR6 Challan Updation Utilization of CENVAT
8.1.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Extract Transaction code
J2I5
Confidential Page 295 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
2. On the Excise Registers Extraction screen, make the following entries:
Choose
Field name
Description
R/ O/ C
User action and values
Excise Group
Excise group for which PLA Register being generated
R
10
State Date
Starting date of Extraction
R
Starting date of data to be extracted for PLA registers
End Date
Ending date of Extraction
R
Ending date of data to be extracted for PLA registers
Selection Registers
Mass extraction of data to all registers
R
Select the radio button Select Any Register option
Select individual Registers
Selection of individual register
R
Activate the PLA Check box to extract the PLA Register
Display Last
Displays the
O
Confidential Page 296 of 316
Comment
User can generate all the registers together or individual register wise
System will
Materials Management User Manual For Duro Shox Pvt Limited 1.0 Extracted dates
previously upto what date the register has been extracted for information
Version
display the last extraction date on the screen
3. Click on execute icon or Press F8 or Program Execute
4. If the PLA Register is being extract for the Period First Time, system will execute the report and display the pop-screen with Register name and Green Tick mark, if it is successfully extracted, otherwise it will show the Red Cross.
Confidential Page 297 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
8.1.4 Result PLA data has been extracted
8.2 PLA Register Print Utility 8.2.1 Use The objective of this process is to print the PLA Register or to display on the screen.
8.2.2 Prerequisites The data must be extracted to the PLA Register for the period to which PLA Register need to be printed.
8.2.3 Procedure 1. Access the transaction choosing one of the following navigation options: SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Print Utility program Transaction code
J2I6
2. On the Print Excise Registers screen, select the PLA Radio button to print the PLA Register.
Confidential Page 298 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
Choose
3. Click on Execute icon or Press F8 or Program Execute
4. On the Print PLA Register screen, make the following entries:
Choose
Field name
Description
Excise Group
Excise group for which PLA Register is being generated
Start Date
End Date
R/ O/ C
User action and values
Comment
R
10
Enter the Excise Group
Starting date of the period for which currently PLA Register is being generated
R
For example 01.09.2005
Starting Date
Ending date of the period for which currently PLA Register is being generated
R
For example 30.09.2005
Ending Date
5. Click on Execute icon or Press F8 or Program Execute
Confidential Page 299 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
6. System will display the Print parameters maintenance screen assign the out put device name and select the Print Preview option. System will display the output on the screen.
7. See the output on the screen and based on the requirement print the output using Ctrl + P option or through menu Text Print.
8.2.4 Result PLA register displayed on screen or printed.
Confidential Page 300 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9. Reports 7.1
Purchasing 7.1.1 Purchasing Documents per Vendor (ME2L)
Chose Execute Icon
Confidential Page 301 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7.1.2 Purchasing Documents per Material (ME2M)
Choose Execute
Confidential Page 302 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7.1.3 Source List for Material (ME0M)
7.1.4 Purchase Info Record per Material (ME1M)
Confidential Page 303 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 304 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
7.1.5 Purchasing Values(MC$G)
Choose Execute
Click Switch Drill Down Icon
Confidential Page 305 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 306 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9.2
Inventory
9.2.1 Material Document List (MB51)
Choose Execute
Confidential Page 307 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Click this Icon to have Detail View.
Confidential Page 308 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Version
9.2.2 Diplay Warehouse Stock (MB52)
Choose Appropriate Input for your selection.
Choose Execute or Press F8.
Confidential Page 309 of 316
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9.3.3 Stock on Posting Date (MB5B)
Select Apropriate Entries For your selection
Choose Execute or Press F8
Confidential Page 310 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 311 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 312 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9.3.4 Stock Overview (MMBE)
Choose Execute or Press F8
Confidential Page 313 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
9.3.5 Stock in Transit (MB5T)
Choose Execute or Press F8.
This means no stock in transit
9.3.6 Slow Moving Items (MC46)
Confidential Page 314 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Select Appropriate Input Entries
Choose Execute and Press F8.
Confidential Page 315 of 316
Version
Materials Management User Manual For Duro Shox Pvt Limited 1.0
Confidential Page 316 of 316
Version