Michigan Welfare From Stimulus

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Michigan Welfare From Stimulus as PDF for free.

More details

  • Words: 837,897
  • Pages: 1,238
Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

16th Circuit Court

16th Circuit Court

16th Circuit Court

16th Circuit Court

Clinton Township

Clinton Township

Warren

Warren

Project Name

Project Description

Start Date

Expected Completion Date

delinquency prevention; school success

Develop infrastructure of connections to familiarize juveniles--who have attendance and behavioral problems at school--and their parents, to 21st-century workforce opportunities; and provide the juveniles with community service experiences that greatly strengthen their sense of personal accomplishment. 6/1/2009

day treatment

Enhance services for education and workforce training in a day treatment program that provides adjudicated juveniles who are at risk of out-of-home placement with comprehensive educational programming to achieve a high school diploma or GED. Other program components include college prep, life skills, work readiness, vocatrional training, counseling, and community service. The program will focus on educational achievement and preparing youth for post-secondary education and entry into the work force. 6/1/2010

delinquency prevention; school success

Develop infrastructure of connections to familiarize juveniles--who have attendance and behavioral problems at school--and their parents, to 21st-century workforce opportunities; and provide the juveniles with community service experiences that greatly strengthen their sense of personal accomplishment. 6/1/2009

day treatment

Enhance services for education and workforce training in a day treatment program that provides adjudicated juveniles who are at risk of out-of-home placement with comprehensive educational programming to achieve a high school diploma or GED. Other program components include college prep, life skills, work readiness, vocationa training, counseling and community service. The program will focus on educational achievement and preparing youth for post-secondary education and entry into the work force. 6/1/2009

Academy of Flint's Rennovation and construction site project

Rennovation and construction of a facility located at G-2040 W. Carpenter Road, Flint MichigaN 48505 The property will be rennovated to make the property more energy efficient. To update classrooms and to construct new classrooms for a High School program. The Academy will also improve the facility wiring for better electrical efficiency and to make the building more technology based. Significant is a focus on a Solar energy production site on the campus. The Academy will also upgrade the different educational resouce labs and rennovate the music room, computer room and other staff and students educational areas. 7/1/2009

T O

9/15/2010

N s

D VE $

100,000

9/30/2010

$

360,000

9/15/2010

$

100,000

9/30/2009

$

360,000

1/1/2010

$

750,000

O R

P P A

Funding Request

Route (Infrastructure Only)

t s e

Academy of Flint Addison Community Schools y

G-2040 Carpenter Rd.

Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools

02262009

R d

Wayne Gray Elementary

Replace boiler

6/8/2009

9/1/2009

$

15,000

Replace roof - Maint. Building

6/8/2009

9/1/2009

$

40,000

Roof repair/replacement

6/8/2009

9/1/2009

$

60,000

Replace bathroom partitions - boys bathroom West

6/8/2009

9/1/2009

$

3,500

Wayne Gray Elementary

Upgrade fire alarm system

6/8/2009

9/1/2009

$

10,000

Upper Elementary Building

Upgrade fire alarm system

6/8/2009

9/1/2009

$

10,000

Upper Elementary Building

Replace boilers

6/8/2009

9/1/2009

$

45,000

General Campus

Security cameras campus-wide

6/8/2009

9/1/2009

$

60,000

Upper Elementary Building

Roof repair/replacement

6/8/2009

9/1/2009

$

108,000

General Campus

New asphalt on west end of campus

6/8/2009

9/1/2009

$

200,000

General Campus

e t t

Wayne Gray Elementary

it

Wayne Gray Elementary

m b u

S

u q e

Submitted Requests - Not Approved

1 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Adrian College

Project Name

Project Description

Start Date

Adrian

Through the renovation, expansion and integration of science-related academic fields and entrepreneurial studies, we propose to completely upgrade and modernize College facilities to be state-of-the-art, energy efficient and a stimulant for jobs in our region. Currently on the campus of Adrian College, there are two buildings, built in 1960 and 1966 respectively, that have not received major renovations or upgrades for nearly 50 years. This plan calls for total renovation of these two buildings that are key gateway facilities to academic programs including science, business, history, entrepreneurial studies, earth science, biology, political science, academic services Science Buildings Renovation and Expansion and sports management. The current state of these facilities at Adrian College is outdated, substandard and lacking in energy efficiency. 3/1/2009 (Peele and Jones Halls)

Adrian

Adrian College

20,000,000

The Adrian College Arts and Interior Design departments are currently located in Mahan Hall, a 44-year-old building with significant energy management, technology, and maintenance challenges. Adrian College intends to convert Mahan into a state-ofthe-art classroom, studio, and exhibition space, providing a stimulus to jobs and the economy in our region.: PHASE ONE (Complete): Limited upgrade of classroom and studio space; Conversion of most basement floor space to Art Department; Conversion of most of first floor to Interior Design, including office renovation, lighting lab relocation, and multiple classroom reconfiguration; Addition of an Art Education Classroom in Mahan basement; Relocation of Fibers Studio to Mahan; Relocation and upgrading of faculty offices; and Relocation of Radio transmitter and remaining Communication Arts equipment to Rush Hall. PHASE TWO (December 2009): Total renovation of existing Mahan space; Major renovation of Mahan basement to accommodate enhanced Mac Lab, photography studio, and related studio space; Major renovation of Mahan first floor for Interior Design use; and Major upgrade of Ma 5/1/2009

8/10/2010

$

3,500,000

Through the renovation, expansion and integration of performing arts facilities, we propose to upgrade and expand Dawson and Spencer Halls, two buildings not significantly upgraded since 1962 and 1974 respectively. This will be accomplished in two phases: PHASE ONE: A large, climate controlled storage room located off the south end of the existing Spencer Hall. This new structure would be used to store band equipment, stage extensions, risers, pianos, chairs, and other stage equipment currently stored in the wings and dressing rooms of Dawson Auditorium, on the floor of Spencer Hall, and in the basement of Pellowe Hall. It would also include replacing the old Spencer men’s/women’s restrooms with new, upgraded restrooms. Ramps would replace stairs in Spencer and a new entrance to Spencer would extend from the north side of Spencer Hall along the Dawson wall, allowing for a new ramp and new entrance doors into the west side of Dawson. PHASE TWO: A two-story building wrapping around the exterior of Spencer hall, providing class rooms, faculty offices, teaching studios, practice rooms for the Adrian College Music Department. A dance s5/1/2009

12/1/2010

$

4,900,000

Fire Suppression Upgrade

The fire suppression upgrade is projected to cost $18,300 and involves an inspection of our wet sprinkler system and the replacement of all sprinkler heads over fifty years old in the body of the library. 3/15/2009

Adrian Public Library

9/15/2009

$

18,300

Elevator Replacement Construction

Our elevator is being replaced by a holeless elevator from Otis. This is a green project as it is being replaced due to concerns of jack failure and potential ground water contamination. The estimated construction cost of the elevator project is $49,000. We are in the process of purchasing the elevator replacement at an additional cost of $61,700. 3/15/2009

6/15/2009

$

61,700

Adrian Public Library Lighting Upgrades

Upgrade of 50 year old building wide lighting system. Installation of fluorescent lighting with electronic ballasts. This project will not only result in energy efficiency but also result in higher quality illumination and color rendition. 3/15/2009

8/15/2009

$

176,500

d e tt

t i m

Performing Arts Building Renovation and Expansion (Dawson/Spencer Halls)

ub

Adrian, MI

S Adrian Public Library

Adrian Public Library

Adrian, MI

Adrian, MI

02262009

N s

st

e u

q e R

P P A

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

Visual Arts Building Renovation and Expansion (Mahan Hall)

Adrian

O R

Funding Request

12/1/2010

T O

Adrian College

Expected Completion Date

2 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Adrian Public Library

Adrian Public Library

Adrian, MI

Adrian, MI

Advanced Technology Academy Dearborn 48126

Project Name

Project Description

Start Date

Expected Completion Date

Adrian Public Library North, East, and West Exterior Renovation

Removal of the existing EFIS (Exterior Finish and Insulation System) with take place on the North, East and West elevations. It will be replaced with new masonry and brick to 8 ‘ above the ground. Installation of new energy efficient EFIS will take place above the new brick to the roof deck. This project is projected to cost $233,000.00 3/15/2009

Adrian Public Library HVAC Upgrade and South Façade and Interior Renovation

Our larger renovation project is taking place on the south side of the library and is estimated to cost $641,000. The south side exterior work involves the construction of a new front façade of brick and cultured stone. The south side interior renovation will result in an expansion of 3,200 square feet of public space where a new teen room, coffee shop, and mezzanine for casual library use will be located. A new small business/entrepreneur center will also be located in the renovated area. Energy effiencenies will be gained in this project by the use of sustainable materials in the furnishings (furniture and floor coverings), updated HVAC and insulation for this area of the building, the recycling of hot air created in the coffee shop to our building wide HVAC system, and solar energy gained by the South windows. 3/15/2009

ATA Phase II Renovations

Addition of new science labs, classrooms and multipurpose building, renovations of existing classrooms, technology and energy efficiency upgrades, site improvements

AGBU Alex and Marie Manoogian School

The AGBU Alex and Marie Manoogian School Board of Directors decided to build a high school building In order to address the growing needs of the school community. Funding for the new high school building is provided by benefactors as well as the school community. The construction The 35,000 square foot building began in August 2007 and is due to be completed in August 2009. As much excitement as this project has created in the school community, the students are deprived of a playgroud. The Manoogian school serves a K-12 student population of 345 and will grow to more than 400 in the very near future. The children need a playgroud desperately as it provides a safe and enjoyable haven, especially for the elementary and middle school students. This is a request to fund a much needed school playground. 8/1/2009

D VE $

233,000

8/15/2009

$

641,000

9/1/2009

$

6,500,000

10/1/2009

$

400,000

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to expand wireless broadband service to a rural region that will pass approximately 255,000 households. This project assumes a 5% market share of those homes passed. Wireless broadband interent technology eliminates any impact to the environment while providing a needed service to rural America. 9/1/2009

8/31/2014

$

12,902,500

Air Advantage is a wireless broadband Internet provider currently serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide a state of the art network operations center (NOC), administration complex and customer support facility to support and service the customers of the Air Advantage network. The new facility has potential to retain our existing 22 jobs and to create at least 30 new high-tech jobs in an area with unemployment rates exceeding the State average. The project will be constructed to LEED specifications. 3/1/2009

12/31/2009

$

4,750,000

T O

9/15/2009

Funding Request

P P A

O R

Spring 2009

Route (Infrastructure Only)

N s

AGBU Alex and Marie Manoogian School Southfield, MI

t s e

u q e

R d

Air Advantage, LLC

Air Advantage, LLC

e t tt

Rural Areas of Lenawee, Monroe counties in MI and Northern Ohio and Wireless Broadband Network Expansion Northern Indiana Regions 7, 8 and 9

i m

b u S

Frankenmuth, MI; Saginaw County

02262009

Wireless Broadband Expansion - Network Operations & Call Center

Submitted Requests - Not Approved

3 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Air Advantage, LLC

Air Advantage, LLC

Air Advantage, LLC

Air Advantage, LLC

Project Name

Project Description

Start Date

Huron, Tuscola, Sanilac, Saginaw, St. Clair, Lapeer Wireless Broadband Network Expansion Counties Current Coverage Area

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to fill in gap coverage that will pass approximately 125,000 customers currently not served in our existing infrastructure footprint. Wireless broadband Internet technology eliminates any impact to the environment while providing a needed service to rural America. 3/1/2009

Rural areas of Bay, Midland, Genesee and Shiawassee Counties

Wireless Broadband Network Expansion Region 1 & 2

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to expand wireless broadband service to a rural region that will pass approximately 155,000 households. This project assumes a 4.5% market share of those homes passed. Wireless broadband internet technology eliminates any impact to the environment while providing a needed service to rural America. 3/1/2009

Wireless Broadband Network Expansion Region 5 & 6

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to expand wireless broadband service to a rural region that will pass approximately 215,000 households. This project assumes a 5% market share of those homes passed. Wireless broadband internet technology eliminates any impact to the environment while providing a needed service to rural America. 6/1/2009

Rural areas of Livingston, Oakland, Isabella, Gratiot Wireless Broadband Network Expansion and Clare Counties Region 3 & 4

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to expand wireless broadband service to a rural region that will pass approximately 200,000 households. This project assumes a 3% market share of those homes passed. Wireless broadband internet technology eliminates any impact to the environment while providing a needed service to rural America. 6/1/2009

Rural areas of Ingham, Clinton and Washtenaw Counties

Expected Completion Date

D VE $

8,725,000

2/28/2014

$

11,146,500

5/31/2014

$

7,166,000

5/31/2014

$

11,784,000

Aisha Shule/W.E.B. DuBois Preparatory Academy

The renovation project for Aisha/Shule/DuBois Academy is designed to modernize and increase the energy efficiency of our circa 1940s building. The renovation plan includes a new roof (that will maintain the historical character of the building); new energy efficient windows and outer doors; remodeling and upgrading of bathrooms facilities; rewiring of the electrical system to support new technologies; the expansion of the school gym facilities to provide the academy's K-12 students with access to an optimum physical education experience during school; and renovation of the school auditorium to create a multi-media center that will allow students to interact with their peers world-wide through video conferencing, as well as provide a place for student presentations and learning through interactions with teachers around the world. 6/1/2009

12/1/2009

$

2,000,000

Replace/Fix High Boiler system

Replace/Fix High Boiler system

5/20/2009

8/30/2009

$

75,000

Modernize Heating and A/C Units

Modernize Heating and A/C Units

7/20/2009

5/20/2009

$

250,000

Classroom Carpet

Classroom Carpet

7/20/2009

7/1/2010

$

30,000

Landscaping HS/Ele

Landscaping HS/Ele

7/20/2009

6/20/2009

$

7,500

Fire/Safety Modernization

Fire/Safety Modernization

7/20/2009

12/30/2010

$

40,000

T O

2/28/2014

Funding Request

P P A

O R

N s

Route (Infrastructure Only)

t s e

u q e

R d

Aisha Shule/W.E.B. DuBois Preparatory Academy Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools

i m

ub

Detroit

02262009

e t tt

S

Submitted Requests - Not Approved

4 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Update Bus Garage

Update Bus Garage

4/20/2009

9/30/2009

$

40,000

Asphalt Resealing and Replacing

Asphalt Resealing and Replacing

4/20/2009

7/20/2010

$

45,000

Replace Plumbing

Replace Plumbing

7/20/2009

6/20/2009

$

55,000

Educational Technology Infrastructure

Educational Technology Infrastructure

7/20/2009

9/20/2009

$

200,000

$

10,000

6/20/2009

$

200,000

9/30/2009

$

70,000

7/20/2009

$

76,000

Fall 09

$ $

100,000 1,000,000

12/31/2009

O R

Well Modernization Well Modernization Replace Exterior Doors, Windows and Reseal Brickwork Replace Exterior Doors, Windows and Reseal Brickwork

5/20/2009

Phone System and File Servers

Phone System and File Servers

5/20/2009

Water Quality Issues

Water Quality Issues

Multipurpose Room

Alcona County

Multipurpose room to be used for numerous activities, Title 1 projects, Special Education activities well as some musical instruction. Completiion of this energy efficient project will also allow for additional classroom space that is much needed in our current cramped quarters. Spring 09 F30 between Wice Road and US 23 (2.5 miles) Hubert Road at N. end of Hubbard Lake from Mt. Maria east to Hubbard Lake Rd (1.0 mile)

Allegan County

Animal Shelter

The Allegan County Animal Shelter Task Force has completed recommendations to build a new shelter to become compliant with State mandates. The Task Force has determined that repair costs to current shelter in combination with remaining life expectancy of current building have been determined to be unreasonable. Location would be adjacent to existing shelter. This would be shovel ready in 180 days. Current General Fund commitments expected to remain in place.

$

750,000

Equipment

The equipment needs for Allegan County Transportation are a back-up power generator, video surveillance for the transit facility, 2ea 2-post vehicle lifts, 1ea screwtype air-compressor. Benefit: Reduces maintenance expense to help maintain fleet an lower operational cost.

$

112,500

Replace six MDOT eligible Transit vehicles. (2 ADA-vans, 4 Buses) Benefit: Reduces maintenance expense, maintains fleet continuity and newer engines reduce emissions providing cleaner air. Public transportation provides more affordable travel options for Americans.

$

332,000

Complete the Phase II portion of the transit facility to include the maintenance shop and enclosed bus storage. Benefit: Supports additional job creation in the construction field immediately and provides additional transit efficiency by reducing operational cost. This facility would create a long term effect by providing ongoing cost savings which would translate into additional access to employment Transportation. Public transportation provides more affordable travel options for Americans. The Phase I under construction now has many “Green Construction” components to include low power consumption lighting and high energy efficient heat and cooling. ACT continues to reduce duplication of services among agencies, by providing access to employment and healthcare to the general public. This has a huge economic impact by assisting residents with employment options not otherwise available.

$

1,645,000

Alba Public School Alcona County

Allegan County

Allegan County

Alba

Allegan City

Allegan City

t s e

02262009

R d

e t t

Bus replacement

b u S Allegan City

O N

u q e

t i m

Allegan County

A T

Transit Facility - Phase II

PP

4/20/2009

s

Allegan

7/20/2009

Submitted Requests - Not Approved

ASAP

9/30/2009

D VE

Route (Infrastructure Only)

5 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Allegan County

Allegan County

Allegan County

Allegan County

City of Allegan

Heath Township

Allegan

Allegan County

Project Name

Park master plan Two years from completed in when funds January of 2009 become available

$

1,791,314

Silver Creek Park Improvements

Park master plan Two years from Make improvements to existing facilities at Silver Creek County Park and completed in when funds Campground (Equestrian Facility) that will draw more tourists and visitors to the area. January of 2009 become available

$

1,296,033

Public Defenders Office

Create a public Defenders Office in Allegan County, or a regional office to serve a group of rural counties, to provide representation to indigent defendants in criminal cases.

$

1,300,000

Environmental Assessment Funds for Brownfield Sites

Allegan County has tried twice and failed to receive brownfield site environmental assessment funds through the EPA grant program. While we currently are awating word on our third application to this program there are economic development opportunities that we are missing out on because of our inability to provide potential developers with funds to assist in assessing brownfield sites throughout the County.

$

400,000

Centralized Economic Development for Allegan County

Allegan County is currently in the process of creating a structure for a county-wide economic development initiative. The County has been without such an initiative since 2004 and our stakeholders, namely cities, villages, and townships, have indicated to us that this void at the county level hinders their economic development abilities at the local level. We will be working with a consultant over the next five months to help us develop a structure for this initiative but there is no question that there will be a large start-up and implementation cost to get this project started. In these tough economic times it will be difficult to impossible for Allegan County to come up with the funding to get this project up and running. We are looking for start-up funding for a two year period that would allow us to establish a county-wide economic development program It is our opinion that after this two-year start-up period this program will be selfsustaining. 1/1/2008

With funding we could implement this program by August, 2009

$

200,000

6/12/2009

$

4,000,000

$

400,000

$

600,000

$

700,000

Allegan County

Allegan,Allegan Township Water and sewer extension

Allegan County

Allegan

Allegan County

Allegan

02262009

Funding Request

Improve and expand the facilities at Littlejohn Lake County Park to increase park usership and increase tourists and visitors to the area.

Allegan County

Allegan

Start Date

Littlejohn Lake Park Improvements and Expansion

Allegan County

Allegan County

Project Description

Expected Completion Date

VoIP system

tt i m

Generations Day Care

b u S

d e t

Dental Clinic/All-In-One Clinic for Dental, Medical, Mental Health/Free Clinic for LowIncome Residents

T O

q e R

P P A

N s

Extend water and sewer from Allegan City system to Dumont Complex at 3283 122nd Ave.to replace aging lagoon system for seven County buildings. 6/10/2009 Deploy a VoIP solution to build a continuity of operations solution with mobility capabilities for County offices. Provide child care services to children of county employees. Allegan County Medical Care Facility is a county owned nursing home that also provides adult day care services. With 300 county employees on campus, child care services would provide inter-generational sharing for residents and children, improve quality of life and serve as a much needed nursing home staff retention tool. March, 2010 To build a comprehensive medical clinic housing: dental, medical, and mental health services all under one roof. This would be funding to construct a new building. This clinic would serve those at 200% or below poverty level. The land would be donated, but construction and initial equipment costs exist.

Submitted Requests - Not Approved

1/10/2009

D VE

When funds become available Ongoing

st

e u

O R

5/9/2009

Route (Infrastructure Only)

September, 2010

6 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Allegan County

Allegan County

Allegan

Allegan

Project Name

Project Description

Start Date

Law Enforcement Center

The Law Enforcement Service Center would be part of an overall phased project to include the County Corrections Center and Inmate Re-entry Center. The facility would accommodate Sheriff’s law enforcement functions including, uniformed services and investigative services and all auxiliary operations of the Sheriff’s law enforcement functions. Furthermore, the Law Enforcement Service Center would include facilities to accommodate the training needs for all Allegan County law enforcement agencies; this would include classrooms, conference rooms and an indoor firearms range.

Inmate Re-Entry Center

The Prisoner Re-Entry center would be part of an overall phased project to include the Correctional Center and the Law Enforcement Service Center. The facility would accommodate all functions necessary to maintain essential operation for a re-entry center, i.e. housing, classrooms, training rooms for vocational education, rehabilitative services and administrative services. This center would share essential operation services such as medical, counseling, food and laundry services.

$

15,000,000

$

35,000,000

Deploy a wireless backbone link between geographically separated data complexes.

$

50,000

The Community Mental Health Outpatient clinic is currently structured in a way that is not safe for staff and for people receiving services. The building needs to be renovated to restrict access beyond the front door, separate children receiving services from adults, and to improve outdoor lighting.

$

145,000

Insulation of moderate value homes for energy efficiency. Specifically attic insulation to an R-38 level in homes with an SEV of >$50,000. The cost would be shared by the homeowner at a 10% rate of the cost of having the desired amount of insulation installed. The US Dept. of Energy estimates that only 20% of homes built before 1980 are adequately insulated. http://www1.eere.energy.gov/consumer/tips/insulation.html

$

1,300,000

P P A

Allegan County

Allegan

Corrections Center

Allegan County

Allegan

A.L.L.C.O.P.S.

The Courthouse Security Program would establish a permanent, supportive enhancement to our Courts at 113 Chestnut, Allegan, MI. Re-allocation of space and construction to allow adequate service to over 110,000 visitors annually is necessary.

Allegan County

Allegan

Wireless infrastructure backbone

Allegan County

Allegan County

tt i m

d e t

q e R

Community Mental Health Clinic Building Renovations (Security)

Allegan

ub

Weatherization Initiatives to Improve Energy Efficiency in Homes

Allegan

st

e u

Courthouse Security

N s

Route (Infrastructure Only)

D VE

10,000,000

T O

Allegan

O R

Funding Request

$

The Correctional Center would be part of an overall phased Project to include the Prisoner Re-Entry Center and the Law Enforcement Service Center. The facility would be a 280-400 bed facility with the ability for future expansions. Facility would accommodate all functions necessary to maintain essential operations, i.e. inmate housing, classrooms, dayrooms, food service, medical services, laundry services, administrative services, educational/program services, visitation services, court services. Furthermore, the Correctional Center would include facilities to accommodate the needs of the staff for training, locker rooms, rest room and break rooms. Allegan County/Township Cooperative Law Enforcement Partnership (Subtitle B. Justice - Byrne COPS ASAP

Allegan County

Expected Completion Date

12/31/2009

S 02262009

Submitted Requests - Not Approved

7 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Allegan County

Allegan County

Allegan County

Allegan County

Project Name

Project Description

Start Date

Allegan

Allegan County has maintained a combined Administrative Services/Courthouse facility in downtown Allegan. As needs have increased over the years and the facility was no longer sufficient to house all operations. General County Administrative Services were moved to a temporary location within Allegan Township as well as Probate Court. Operations such as Equalization, Register of Deeds, Drain Administrative Building to House All Non-Court Commission, and Vital Records still reside in the Courthouse. Given the needs of the Related Functions - Courthouse Bulding For Courts this facility needs to be reengineered to be exclusively a Courthouse. The All Court Functions (Part of County-Wide other operations, including County Administrative Services, need to be located in a Facilities Master Plan) separate facility (County Services Building) within downtown Allegan.

Allegan

Consolidation of Community Mental Health Services Into One Location (Part of CountyWide Facilities Master Plan)

This project is not shovel ready but would include renovating a building, including the possibility of expanding it to accommodate all of Community Mental Health Services a one site. CMH is currently housed in three sites and it would be more efficient if all staff were in the same building.

Allegan

Low Income Housing/Transitional Housing/Shelters/Continuum of Care/Plan to End Homelessness

Lack of affordable housing is a huge issue in Allegan County. We have a developer that is willing to work with us to renovate existing apartment complexes and utilize tax credits or project based vouchers to create housing that is affordable.

Senior Services Funding

Allegan County currently has a millage for senior services and provides such services as personal care, in-home respite, home delivered meals, volunteer drivers, adult day care, homemaking. Unfortunately, the approximate $1 million dollar annual millage is falling short of meeting the demand in these areas and support the implementation of other services designed to meet transportation needs and health/wellness/education with dollars to leverage with the millage funding these services can be enhanced and new services can be implemented.

Allegan

Expected Completion Date

D VE

Preliminary Designs and Internal traffic diagrams are available.

O R

Funding Request

$

6,500,000

Most Judges would tell you that irresponsible alcohol consumption is one of the most significant factors driving our criminal dockets. A solid majority of domestic violence, assault and battery, theft, and property crimes are committed by people with significant alcohol problems. In the last 50 years, the problem of drunk driving has exploded in our society and the courts. Specialty sobriety courts are recognized to be better equipped to handle alcohol cases by permitting swifter resolutions, reducing backlogs, and improving outcomes. The characteristic of most sobriety courts are intense alcohol-addiction treatment and heavy court supervision, using a jail sentence as the last resort. These courts save the court money in jury fees, witness fees and police officer overtime. Also, the time saved on trials and pre-trial motions frees up bench time to be used for review hearings. A probation officer would be necessary to oversee the intensive probation. Some monies (approximately $44,000) could be collected in program revenues and fees.

$

70,000

Deploy a “walk around” wireless solution into strategic municipal areas throughout the County to enhance interconnectivity and provide economic growth.

$

10,000,000

$

40,000

$

850,000

T O

Route (Infrastructure Only)

P P A

N s

t s e

u q e

R d

e t tt

i m

Allegan County

City of Allegan

Allegan County

Various cities throughout Allegan County Municipal Wireless

Allegan County

Allegan County

02262009

Sobriety Court

S

ub

This project to determine feasibility of wind generation on our 240 acre campus at Green Certified/Alternative Energy Feasibility 3283 122nd Ave. to provide part or all energy needs for some of our six buildings at Study this site

Energy Efficiency/Deferred Capital Projects

Goal is to perform replacement of Heating and cooling systems, roofing systems with added insulation, windows and electrical components that are not energy efficient and costly to maintain have been deferred due to lack of available funding. These replacements would be at our Courthouse at 113 Chestnut St, our Jail at 112 Walnut St.,our County Services Building at 3283 122nd Ave., and our Youth Home at 2243 33rd St.

Submitted Requests - Not Approved

8 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Allegan County Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission

Facility Improvement

Ganges Township Otsego and Gun Plain Townships

Culvert Relacement

Replace Culvert carrying Plummers Creek. Current culvert capacity needs improvement to prevent washing out of road which has occurred twice this year.

Road Resurfacing

Resurfacing from Otsego City Limit to 10th Street.

Lee Township Lee and Cheshire Townships

Road Resurfacing

Resurfacing from 48th St to 56th St and Make "All Season" route

Road Resurfacing

Resurfacing from 46th Ave to 56th Ave with minor renovation

Road Resurfacing

Heath Township Watson and Hopkins Townships Saugatuck Township

Lake Michigan Shore Revetment

Lee Township

Culvert Relacement

Overisel Township

Culvert Relacement

Watson Township

Culvert Relacement

Manlius and Saugatuck and Fillmore and Laketown Townships

Allegan Township

Allegan Township

Allendale Township

Start Date

Allegan Township

Detroit Allendale Township, Ottawa County Allendale Township, Ottawa County

02262009

D VE

7/10/2009

$

5/9/2009

7/9/2009

$

180,000 Lakeshore Dr

5/9/2009

7/9/2009

$

450,000 106th Ave

5/9/2009

7/9/2009

$

5/9/2009

9/9/2009

$

Resurface from 58th Ave to Blue Star Hwy.

5/9/2009

7/9/2009

$

732,000 136th Ave

Road Construction and Paving

128th Avenue to 134th Avenue

8/9/2009

11/9/2009

$

3,000,000 38th Street

Road Construction and Paving

15th Street to 1/2 mile west of 12th Street 8/9/2009 Construct shoreline Rock Revetment along Lakeshore Drive in Saugatuck Township to prevent further loss of Lakeshore Drive. 5/10/2009

11/9/2009

$

1,400,000 124th Ave

10/10/2009

$

8,000,000

Replace Culvert washed out in September Storm Event on Local Road System

5/9/2009

8/9/2009

$

180,000 102nd Ave

Replace Culvert washed out in September Storm Event on Local Road System

5/9/2009

8/9/2009

$

160,000 144th Ave

Replace Culvert closed several years ago on Local Road System

6/9/2009

9/9/2009

$

160,000 112th Ave

9/9/2009

$

160,000 20th Street

Road Construction and Paving

Replace Culvert closed several years ago on Local Road System 6/9/2009 Construct and Pave to a three lane width and "All Season" structure from 135th Ave to 129th Ave. 8/9/2009

11/9/2009

$

6,600,000 12th Street

Miner Lake Sanitary Sewer

Construction sanitary sewer around Miner Lake to eliminated failing septic systems.

8/15/2009

11/15/2010

$

6,074,400

Allen Academy

The project comprises a physical education and wellness center facility with four classrooms for a 10-year old, K-12 public school academy in the heart of northwest Detroit. The facility will be enhanced by a landscaped entrance to the campus and appropriate parking that will serve the 1000-student academy community.

6/1/2009

9/1/2009

$

1,400,000

Whispering Creek Drive Grand Valley State University Trunk Sewer Inprovements

Replacement of sewer to eliminate sewer backups. Cured in place pipe lining of trunk sewer to eliminate inflitration of groundwater into sewer. 42nd to Pierce and Pierce to M-45

May, 2009

Aug., 2009

$

186,516

May, 2009

Aug. 2009

$

427,293

Culvert Relacement

s t s

T O

-N

e u

eq

R d

e t t

it

m b u

S

O R

Funding Request

Route (Infrastructure Only)

P P A

Budget Stabilization

Otsego Township Hopkins and Wayland Townships

Allendale Township

Project Description

The County of Allegan is experiencing a similar economic climate as the rest of the state. We are feeling the pain of the economic recession as everyone attempts to cut back on spending. Property taxes, which account for over 65% of our local revenue, are projected to be, at best, stagnate over the next four years. Other revenue sources within the county are either decreasing or at best holding their own. However expenses are continuing to grow 3% to 4% per year with no expansion of services. This in itself presents a serious fundamental problem; there will not be sufficient revenues to support our current level of services. With revenue increases flat over the next four to five years funding for needed capital projects will simply not be available. A choice will have to be made of how to fund the most critical of these projects. In order to pay for some of these projects, current services to the residents of Allegan County may have to be cut (this would mean job loss). The economic stimulus package offers the County of Allegan the opportunity to preserve these jobs while improving the infrastructure of many of the core services we offer the residents of our Rehabitate and replace our Administrative Office and vehicle maintenance facility in Allegan. 5/9/2009

Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission Allegan County Road Commission

Allen Academy

Project Name

Expected Completion Date

Submitted Requests - Not Approved

10,500,000

1,000,000 109th Ave 102nd,103rd,104th 1,400,000 Ave

9 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

City of Alma

City of Alma

Project Name

Project Description

Start Date

Construction of a 40x50 warehouse for the water treatment plant. Warehouse to be used for equipment storage and storage of water distribution repair components such as water valves, and pipe. 8/1/2009

Alma

Water Plant Warehouse Project

Alma

Alterations to the existing Municipal Building that was constructed in 1976 to reduce energy consumption. Retrofit insulation into walls and ceiling areas of the existing structure. Replace existing windows, and install weather stripping; upgrade existing Municipal Bldg Energy Improvements Project mechanical equipment and insulate the existing ductwork.

Alma

Wright Ave Roundabout

Expected Completion Date

7/1/2009

12/31/2009

$

D VE

90,000

$

240,000

10/1/2009

$

500,000 MDOT

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

10/1/2009

$

500,000 MDOT

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

10/1/2009

$

500,000 MDOT

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

T O

s t s

9/1/2009

Funding Request

Route (Infrastructure Only)

O R

P P A

-N

e u

City of Alma

Alma

d e tt

State Street Roundabout

t i m

b u S City of Alma

Alma

02262009

Pine Avenue Roundabout

q e R

Submitted Requests - Not Approved

10 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

City of Alma

Alma

Alma

Project Name

Project Description

Start Date

Sanitary Infiltration & Inflow Project

Project to reduce the infiltration and inflow of ground water and storm water into the sanitary sewer system. Line the interior of existing sanitary sewer mains in the area of Lift Station #8 and repair sanitary sewer manholes to prevent infiltration. Line approximately 10,000 linear feet of sanitary sewer and reconstruction of twenty sanitary manholes. 7/1/2009

Bridge Structure at Pine River

The existing two span bridge structure located on Bridge Avenue crossing the Pine River is presently listed on the MDOT critical bridge list for repairs and reconstruction. Deterioration of the structure has resulted in reduced load limits being imposed and the FSR reduced to its present rating of 38.1.The bridge structure requires replacement of the deck, superstructure, and the replacement or restoration of the mid-span piers of the sub-structure. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed May 2009. 6/15/2009

2010 Sanitary Sewer Replacement

Replacement of sanitary sewer main adjacent to the east side of the Pine River from the north side of Superior Street to the south side of the Mid-Michigan RR tracks. The existing sanitary sewer starts as a twenty inch diameter pipe and flows into a fifteen inch pipe and finally into a 30 inch sewer main. This project would replace the existing fifteen inch pipe with a continuous 20 inch sanitary sewer to the existing 30 inch. The project would reduce sewer backup and overflows during high flow periods. Approximately 900 linear feet of sanitary sewer would be replaced and two bores would be required to cross the RR tracks and the state trunk line of B.R. 127. 6/1/2009

Alma

D VE

500,000

12/15/2009

$

859,000 MDOT

10/1/2009

$

160,000 MDEQ

The Alma Riverfront Brownfield Project is the final phase of removing the remaining contaminated soil in the Alma Downtown Riverfront Redevelopment Project Area. The goal of this long-term project is to reclaim the Mill Pond Riverfront from its history of industrial usage, to create a mixed used development for commercial, retail, recreation and residential living. This development would be like no other in the Mid Michigan area. With funding from an SEP Project, CMI Grant, DEQ Loan, EPA Cleanup Grant and Local Funding the City of Alma as accomplished: The environmental study of the riverfront area, Community Master Planning and Concept drawings for the riverfront, purchase of property, demolition of the existing structures and removal of contaminated soils. A major component of the project was to move outdated Alma Iron and Metal facility (Metal Recycler) off the riverfront and relocating them to a more appropriate area on the former Total Refinery property (this site also considered a brownfield). This piece of the project allowed Alma Iron and Metal to build a brand new facility with today’s current environmental standards and expanded 6/1/2009

10/31/2009

$

270,000 MDEQ

Reconstruction of Golfside Drive from Superior Street south to Riverview Drive (0.37 miles) and Pineview Court from Riverview Drive southward (0.06 miles). Both streets are city local streets with a Paser rating of 4 for Golfside Drive and a Paser rating of 3 for Pineview Court. Reconstruction on Pineview Court would include replacement of concrete curb and gutters as required, improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Reconstruction on Riverview Drive would include improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in March of 2009. 6/1/2009

9/1/2009

$

345,000 MDOT

s

t s e

9/1/2009

Funding Request

Route (Infrastructure Only)

$

A T

City of Alma

Expected Completion Date

PP

O R

O N

u q e

City of Alma

Alma

R d

i m

b u S City of Alma

Alma

02262009

e t tt

Alma Riverfront Brownfield Project

2010 Capital Improvement Project

Submitted Requests - Not Approved

11 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

Alma

Project Name

Project Description

Start Date

2009 Capital Improvement Project

Reconstruction of Prospect Avenue from Center Street north to Ammi Street (026 miles) and the resurfacing two blocks of Pine Avenue from Walnut Street north to Washington (.024 miles). The existing street (Prospect) is a major city street located in the central business district; and has a Paser rating of 2. Pine Avenue is also a major street within the City and is the principle route to the area High School and Middle School which experiences poor drainage issues. Reconstruction would include replacement of concrete curb and gutters as required, improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in March of 2009. 6/1/2009

Downtown Street Lighting Project

This summer working with MDOT the City of Alma completed the first phase of a downtown streetscape. Part of the streetscape included replacement of 36 of the thirty year old mercury vapor lights with new historically significant LED lights. The new LED lights use only 10% of the power the current mercury vapor lights use. Also the light fixture itself is estimated to last 15 years before it needs replacement, saving on maintenance costs. The style of the new lights has also been approved by the Michigan Historic Preservation Office as significant to the downtown of Alma. There is great energy savings potential in replacing the remaining 141 mercury vapor lights owned by the City of Alma in the Downtown District, with the new LED lights. The engineering for this project could be completed by April 15, 2009, and installation by September 30, 2009. 6/1/2009

Alma

S. Lincoln Ave Reconstruction

O R

Funding Request

Route (Infrastructure Only)

D VE

9/1/2009

$

430,000 MDOT

11/15/2009

$

680,000 MDOT

Reconstruction of S. Lincoln Avenue from the south City Limits to Marshall Street (0.50 miles), which is the only access to the City from the southward direction. The existing street is a major city street with an ADT of 5,000; that is presently two lanes and has a Paser rating of 2. Reconstruction would include installation of concrete curb and gutters, improvements to the storm sewer system, replacement of the street substructure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in April of 2009. 6/15/2009

9/15/2009

$

809,000 MDOT

W. Superior Street Reconstruction

Reconstruction of W. Superior Street from West City Limits to Charles Avenue (0.53 miles), which is the only access to the City from the westward direction. The existing street is a major city street with an ADT of 10,000; that is presently two lanes and has a Paser rating of 5. Reconstruction would include concrete curb and gutters, improvement to the storm sewer system, replacement of the street sub-structure, new HMA surfaces and increasing street width at the intersections with two other major streets (Luce Road and Charles Avenue) to three lanes for a center turn lane to increase safety. Street width would also be increase the entire length of the project for the inclusion of two “non-motorized” bicycle lanes”. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in April of 2009. 6/15/2009

9/15/2009

$

860,000 MDOT

Runway 18/36 Rehab Project

The rehab of the 3200’ north/south runway 18/36 and Taxiway B is currently under design and would be ready to go in the time frame specified. The project is part of the Gratiot Community Airport’s Five Year Development Plan. The project involves mill and resurface of the runway and taxiway, crack repair and grooving the runway surface. The Gratiot Community Airport Commission in the last five years has focused on raising revenues and improving current facilities and not construction any new facilities. 6/15/2009

9/15/2009

$

495,000 MDOT

T O

City of Alma

Expected Completion Date

P P A

N s

t s e

City of Alma

Alma

R d

e t tt

i m

City of Alma

City of Alma

Alma

b u S

Arcada Twp

02262009

u q e

Submitted Requests - Not Approved

12 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma Alpena Community College Alpena Community College Alpena Community College Alpena County Alpena County Alpena County Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm Alpena County Road Comm

Arcada Twp

02262009

Project Name

Project Description

Start Date

Runway 9/27 (east/west) is Gratiot Community Airport’s 5,000 foot main runway. In 2005 the east portion (runway 27) of the parallel taxiway was completed. The Airport Commission planned to complete the west portion (runway 9) of the taxiway when funds were available. The taxiway would be 2000 foot long and improves the operational safety of the runways by eliminating the need for backtaxiing on runway 9/27. The completion of the taxiway is also important as the airport moves to a WAAS system for GPS landings. The taxiway will allow the approaches to the runways to be lowered, making it safer to land. The new system will lower the current navigational maintenance costs for the airport. The taxiway project was scheduled as a 2010 project if there were enough AIP funds from the Federal Government available. The airport is a very important tool for rebuilding the County’s economic base and in 2009 Gratiot Community Airport will become an airport authority. The authority will contain the current owners the City of Alma and Gratiot County. The new members of the authority will be City of St. Louis, City of Ithaca, Pine River Township a6/15/2009

Construction of Parallel Taxiway

ACC Lafarge Training Center

P P A

625,000 MDOT

6,825,000

$ $ $ $

7,998,000 50,000 100,000 3,000,000

$

310,000

$

400,000

$

600,000

$

700,000

Misery Bay Road

$

800,000

Genschaw Rd./Hamilton Rd. Connector

$

1,000,000

Leer Road Resurfacing - M065 to Carr Rd. (4.5 miles)

$

1,020,000

Jacks Landing Road

$

1,500,000

Wolf Creek Road Resurfacing

$

1,650,000

Bloom Road Construction - .5 miles east of Wessel Rd. to North Point (3.5 miles)

$

1,750,000

Nicholson Hill Road Resurfacing - Spruce Rd. to Wolf Creek Rd. (6 miles)

$

1,820,000

Lake Winyah Road

$

2,000,000

Werth Road Resurface - Mud Creek to Spruce Rd (3.5 miles)

$

2,020,000

Herron Road Reconstruction

$

2,250,000

Tamrack Road/Werth Road Connector

$

4,000,000

T O

N s

st

e u

Pearl Road

Hamilton Rd. Resurface

eq

Cathro Rd Resurface

S

$

$

New Salt Building Construction

m b u

9/15/2009

R d

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 1,312,000

ACC Transportation Center of Excellence Long Rapids Recreational Imp. Hubbard Lake Rd. Park Imp. Airport Improvements

it

O R

Funding Request

$

ACC Electrical Power Technology Education and Training Center

e t t

Expected Completion Date

13 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Project Description

Start Date

Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township

Bridge Across the Thunder Bay River Highland Ct. Water Extension Industrial Park Lake Winyah Water Extension Infrastructure Improvements in Alpena Twp Park Service Drive to Business off Bagley St. on N. Side of M-32 W. Infrastructure Imp. On Genshaw Rd. to Accommodate Golf Course Third St./Tamrack Rd. Extension

Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township

Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township

Alpena Twp. - Water Extensions in Lay/Werth Rd. and French/Truckey Rd. Areas Long Lake Rd. Imp: Hamilton Rd. to US23 N. Road Relocation & Improvements: Burkholder Dr. to Lake Winyah Rd Water Extension: Burkholder Dr. Area Alpena Twp. Water/Sewer Imp. - Hamilton/US-23 N. Alpena Twp - Misc. Water and Sewer Extension Develop Road from Hamilton Rd. to Bagley St. Service Dr. - Bagley to King Settlement on S. side of M-32 W.

Alpena Township

Alpena Twp

Hamilton Road Water & Sewer Improvements - Includes Extension of 1750 LFT of 12" water and 8" sewer from US-23N east along south side of Hamilton Rd. Extension of 250 LFT of 12" water across Hamilton Road along east side of US-23N. Summer 2009

Fall 2009

$

Hamilton Rd US-23 630,000 North

Alpena Township

Alpena Township, Alpena Hamilton Road Water and Sewer County Improvements

Extension of 1750 l.f. of 12" water and 8" sewer from US 23 north east along sould side of hamilton Road. Extention of 250 l.f. of 12" water across Hamilton Road along east side of US 23 North. Summer 2009

Fall 2009

$

630,000

This project partners a small Michigan company, Alternative Consumable Energy Solutions, Inc., (ACES) of Whitmore Lake, which has assembled and installed solar panels for 12 years, with Solar BanCorp, Inc. (SBC) of Toronto, Canada, to introduce 2 cutting edge Advanced Solar Technologies superior to any currently available. SBC is making them exclusively available to ACES for MI/OH. Bringing this new technology to Michigan now will help make it a leader in Advanced Solar Technology. SBC has: 1 Developed solar panels that deliver 200% of energy per SF of any current solar panel at about the same cost, with advanced solar energy storage for up to 9 days. System tests in Toronto will be completed in May 2009 and new panels will be available for introductory markets in the fall of 2009. 2) Become the North American distributor of new Eastern Europe technology – a solar film that is far more flexible and easier to install than other solar panel material; producing 20% more energy per SF than current technologies – at 10% less cost. ACES seeks state funds to install $60,000 systems on 50 state buildings ($3 Million); 2/3 the cost on 50 county and city office bu 5/1/2009

5/1/2010

$

5,000,000

Oct. 1, 2009

$

150,000 NA

10/1/2009

$

650,000 NA

8/1/2009

$

500,000

Local Road Resurfacing

Altenative Consumable Energy Solutions (ACES) & Eco-Park Ann Arbor/ Whitmore Partners, LLC Lake

Amboy Township American Montessori Academy

Redford Township

02262009

d e tt

t i m

Advanced Solar Installation

ub

S

Amboy Township, Hillsdale County Amboy Township, Hillsdale County

$

T O

s t s

O R

-N

Merry Lake Sewer Renovation Project

Install dry hydrants at Lake Diane to assist local fire departments with water supplies to utilize in fighting house, crop fields, and wildfires. These dry hydrants would service four rural community volunteer fire departments. The water from the lake would be delivered directly from the lake to the fire truck on the street. This eliminates the need of using well water. 8/1/2009 Lift station renovation, pond sludge removal and discharge measuring device installation. 4/1/2009

Elementary School Renovatoin

Renovate a 1950s parochial school for use as a public school academy.

Dry Hydrant Installation

Submitted Requests - Not Approved

6/1/2009

5,000,000

D VE

P P A

e u

q e R

Funding Request

Route (Infrastructure Only)

Submitting Agency Alpena County Road Comm Alpena County Road Comm Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township Alpena Township

Amboy Township

Project Name

Expected Completion Date

$ $ $ $ $ $ $

115,000 120,000 198,000 300,000 565,000 600,000 1,200,000

$ $ $ $ $ $ $

1,430,000 1,500,000 1,800,000 2,000,000 3,000,000 3,200,000 4,200,000

14 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Berrien Spirngs Andrews University Oronoko Township

Project Name

Project Description

Start Date

Buller Hall Buller/Nethery Hall

6/1/2009

Andrews University

Oronoko Township

Upgrade ResNet connectivity

Upgrade broadband connections from 10Mbps to 100Mbps to the 640 residence hall rooms. 1 port per pillow. Each of three buildings would have 1GBps connections to Campus network. 5/9/2009

Andrews University

Oronoko Township

Broadband to University Housing

Install 100Mbps broadband Internet service to each of the 350 University apartments 6/9/2009

The Film Empowerment Project

This project will directly reach high school students throughout Southeast Michigan with art-driven, high-caliber short films presented by a filmmaker, with moderated discussion to teach media literacy. This program leverages the world-class creative content of the Ann Arbor Film Festival (AAFF) and a new focus within the State of Michigan toward the film industry. The AAFF is already conducting a traveling tour within the State of Michigan in the Summer of 2009 (state funded project) and has the capabilitiy to deliver this Film Empowerment project with a funded coordinator position. Increasing the impact of these workshops, the AAFF will provide free tickets to the participating students to attend the film festival and meet visiting filmmakers from throughout the world. This experience can enrich and empower high school students as they consider their future careers. 9/15/2009

Arab American National Museum

Ann Arbor Film Festival

Ann Arbor

Expected Completion Date 9/1/2010

Nov. 2010

$

13,000,000

D VE $

160,000

$

804,900

9/15/2010

$

35,000

We seek to demolish and renovate two small buildings adjacent to the Arab American National Museum (a project of ACCESS). This project will expand the Arab American National Museum by 15,000 square feet, increasing its size by almost 50%. This expansion will add space to the museum’s current 750 sq.-ft. store, and its 1,800 sq.ft. public library. It will also add a coffee shop, two classrooms, and exhibit design space. ACCESS has already received a Federal allocation through HUD of $1.1 million in restricted funding to purchase these two adjacent buildings. We have also developed architectural plans but put the project on hold due to the current state of the U.S. economy. The Arab American National Museum is the only museum in the U.S. that is dedicated to documenting and presenting Arab American history and culture. It is located in East Dearborn, adjacent to Detroit. It provides services to 50,000 people annually; 50% are students. The Museum serves diverse populations, many of whom come from low-income and/or new immigrant communities. Our programs are either free or very affordable. This expansion will not only ensure long-term employment for 6/1/2009

3/1/2011

$

8,100,000

Five pedestrian connections will be constructed for access to the commercial and retail uses on the north and south side of West 7 Mile Road. Designed as green spaces they will also serve to connect the residential neighborhoods on each side of the commercial corridor as well. 8/15/2009

7/15/2010

$

1,100,000

To define the image and support the marketing of the area, the neighborhood streetscape project will install streetlights, repair/replace sidewalks, street trees, planting beds, and pedestrian amenities such as benches and signage.

8/15/2009

5/15/2011

$

15,500,000

7/1/2009

7/1/2012

$

3,000,000

4/1/2010

$

4,500,000

T O

1/10/2009

Funding Request

P P A

O R

Route (Infrastructure Only)

N s

t s e

Arab Community Center for Economic and Social Service

Arab-American and Chaldean Council

Arab-American and Chaldean Council

Arab-American and Chaldean Council

Arab-American and Chaldean Council

Dearborn, Michigan

Detroit

it

m b u

Detroit

Detroit

Southfield

02262009

R d

e t t

Green Pedestrian Connections to Neighborhoods

Neighborhood Streetscapes

S

u q e

The program will target training and placing 300 jobs seekers per year in to the construction trades , including Electricians, plumbers, home remodelers, and CAD designers. The emphasis will be placed not on numbers alone, but on effectively Bridges to Building Career Center Consortium- serving each client as indicated by successful job placement in a Career with a New Career Center in the city of Detroit. laddering opportunities.

ACC Headquarters-Oakland County

The Arab-American and Chaldean Council (ACC) will construct an Oakland County headquarters. The ACC serves the areas of Wayne, Oakland and Macomb Counties as well as the City of Detroit and needs a visible and central presence to serve the growing Arabic population in Oakland County. 8/15/2009

Submitted Requests - Not Approved

15 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Arab-American and Chaldean Council

Arab-American and Chaldean Council

Arab-American and Chaldean Council Arab-American and Chaldean Council

Arab-American and Chaldean Council Arab-American and Chaldean Council Arab-American and Chaldean Council

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Souk Development

The souk market will serve as the focal point of the West 7 Mile Road neighborhood to highlight the Arabic heritage and image of the community. Operated with enclosed and open air vendor stalls merchants will set up displays, and sell wares, art, and ethnic foods to the public. 7/15/2009

Detroit

Seven Mile Streetscape

The proposed streetscape project, consisting of new street trees and flowering plantings, benches and trash receptacles, sidewalk improvements, and crosswalks will result in increased pedestrian traffic and improved esthetics that inherently generate increased revenue for local businesses. The overarching goals of this project are to provide sustainability and livability, attract economic development and preserve the community.

Detroit

Demolition of Unsalvageable Foreclosed Properties

To aid in the marketing of the area and provide land area for new housing, the infrastructure and surface improvements, the green pedestrian connections, the neighborhood streetscape improvements, and the souk market.

6/15/2009

4/15/2010

$

350,000

Infrastructure and Surface Improvements

This project will repair/replace/install public water, sewer and storm water systems in the area and construct 150 new parking stalls for the West 7 Mile Road corridor retailers, souk market and commercial venues. 6/15/2009

4/15/2011

$

1,450,000

Detroit

Neighborhood Redevelopment Strategy

This plan will present redevelopment guidelines to improve neighborhood safety and security, expanded housing options, neighborhood recreation and park facilities, traffic circulation and parking, pedestrian-friendly access, wayfinding systems, and funding strategies. Emphasis is placed on easily maintained materials and plantings, energy efficient building components, and green building design. The geographic area is north from Nevada Street to West State Fair Street and east from Woodward Avenue to the Canadian National Rail right-of-way. 2/17/2009

8/17/2009

$

425,000

Detroit

Administration of Redevelopment Strategy

0.03

$

1,200,000

Assemblage of Vacant Properties

Assembling properties in the area will be performed by real estate professionals for the purpose of expediting the redevelopment of the area for the local residents and expected influx of Iraqi immigrants.

Detroit

Detroit

Detroit

T O

q e R

O R

6/15/2009

P P A

N s

st

e u

5/15/2010

4/1/2009

4/15/2011

$

1,300,000

$

1,600,000 Seven Mile Road

D VE

10/1/2010

$

2,500,000

This project will rehab up to 250 homes in the area. Similar to CDBG in administration and goals the renovations will mitigate lead-based paint, and improve energy efficiency through the replacement of windows, exterior doors, siding, insulation, roofing and appliances using Energy Star® certified building materials and construction methods. 5/1/2009

5/1/2011

$

5,400,000

Arab-American and Chaldean Council

Detroit

Armbruster Inter County Drainage Board

Tuscola County, Huron County, Michigan The Armbruster Drain outlets into the Wiscoggin Drain at Clark Rd. in Sec. 14 of Akron Twp., Tuscola County. The Drain runs east 2 miles along Wildner Rd. and enters Huron County; continues east along Wildner Rd. 0. Armbruster Intercounty Drain

Flood Relief for School & Agricultural Land Reconstruct existing channel to proper grade and cross-section Install new road and driveway culverts with proper size and grade Extend branches to currently inadequately drained areas Install appropriate soil erosion control facilities Jul. 2009

Sept. 2010

$

790,000

Mt.Pleasant

Demolition of a portion of the existing Art Reach Center, retaining the original historic recital hall. Construction of a new multi-story 8000 sq. ft.addition to house classrooms art studios, meeting & exhibit spaces, staff offices & work areas, etc. 5/9/2009

5/10/2009

$

1,580,000

tt i m

Art Reach of Mid Michigan

d e t

Housing Rehab and Renovation

b u S

02262009

Art Reach Center Expansion & Remodeling

Submitted Requests - Not Approved

Route (Infrastructure Only)

16 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Arts Council of Greater Lansing Lansing, MI

Project Name

Project Description

Start Date

Arts Tickets Box Office Expansion

The Arts Tickets Box Office Expansion would provide an improved physical location, as well as a virtual online system to serve up to 140 arts and cultural groups in Ingham, Eaton and Clinton counties. Details of the expansion include a robust cultura calendar system, customizable cultural itineraries for paid and free activities, cultural mapping for tourism activities, online payments and donations for additional arts services, links to area restaurants and other businesses, and a highly visible physical location in downtown Lansing, blocks from the state capitol. The service would maintain and grow jobs in the arts and cultural sector, would help attract employees and cultural tourists, would add up to four jobs to to maintain and manage the Box Office, and would provide an additional four jobs for local designers, programmers and IT persons to assist with the operations of the system. The project has the support of the Lansing Economic Area Partnership (LEAP), the Greater Lansing Convention and Visitors Bureau, and the regional cultural community. upon notification

Arts League Cranbrook Urban Campus

O R

100,000

Arts League Cranbrook proposes to create an Urban Campus Neighborhood in Detroit utilizing adaptive reused, renovated, LEED certified buildings that would house K-12 charter schools. In addition to utilizing the building(s) for the schools, the multiuse facilities would also be used as a community oriented after school and weekend Arts and Sciences Center. The facilities would educate more than 1250 school children and adults daily. The "Artology" Center will provide public programs, classes, tutoring, educational enhancement activities and capitalize on the community resources in the immediate area as well as the variety of resources and educational opportunities available throughout the state. Faculty and staff will be drawn from the ranks of Cranbrook Academy of Arts graduates, Cranbrook Institute of Science interns and Arts League of Michigan affiliated artists, as well as experienced educators. 200 construction workers would be employed over the next 18 months and the school and “Artology” Center would provide 150 new permanent jobs. A set of existing buildings will be renovated to house the AL-C charter school(s), a K-12 colleg 7/1/2009

6/1/2011

$

25,000,000

Blue Shores: Tours Via Michigan Art

Project Description Goal: to stimulate tourism, revenues and appreciation of Michigan in three ways: 1. Twenty Michigan artists create individual art pieces which when joined become a mural featuring a prominent Michigan shoreline locale: ie, Sleeping Bear Dunes. Michigan shoreline galleries and/or town halls would each have one of the segments displayed, creating 20 destinations for touring Michigan. Annually the 20 sites would change, allowing many Michigan sites to participate over the years. Promotion to include Michigan.org, travel guides, yearly posters, website updating. Promotion to be both national and international for travel opportunities in the Us, especially Michigan. For example utilizing Intrepid Travel which brings Austrailians to the western US but not Michigan. 2. Yearly a book would be published of the works of the 20 participating artists via Lulu.com or other website. This showcases Michigan artists, project information and history. The book would be distributed and sold at Maritime Museums, lighthouse sites, State Parks, national Lakeshores, libraries, travel bureaus, bookstores, online, etc. 3. Blue shores Festival, annually, would promoas soon as

year 2

$

308,400

Monroe Street Water Main

Monroe Street Water Main: Ash Township developed plans to extend a 12” water line through the downtown Village of Carleton. The current water mains are 4” to 6’ in diameter and are near70 years old. The Village is in the process of creating a new streetscape on Monroe Street within the Historical Downtown area. They are in need of a new water line prior to undertaking the streetscape project. 4/1/2009

1.5 years

$

1,350,000

t s e

Route (Infrastructure Only)

D VE $

s

Detroit and Pontiac

PP

Funding Request

180 days

A T

Arts League Cranbrook

Expected Completion Date

O N

u q e

R d

ArtServe

i m

ub

Lansing, MI base

e t tt

S Ash Township

Ash Township

02262009

Submitted Requests - Not Approved

17 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Ash Township

Ash Township

Ash Township

Ash Township

Project Name

Ash Township Water Main Improvements

Grafton Road Water Main Replacement

Grafton Road Water Main Replacement: Currently Grafton Road between Sigler and Newport has 4” water main that was installed in the 1920’s to service an old Nike base. The water line is in poor condition and unable to provide the 30 residents with adequate fire protection. The resident’s serviced by the line request that Ash Township remove and replace the 4” line with a new 12” main that will provide them with adequate flows and pressures and ensure them proper fire protection. Estimated Cost $375,000. 4/1/2009 Telegraph Rd. Sewer Treatment Facility. Purchase sewer treatment facility on Labo and Telegraph Rd. to allow us to run sewer lines down Telegraph Rd. This is the heart of our commercial and industrial zoned property The location is a rural community of 10,000 called Ash Township (Carleton), MI. Their currently is no sewer on Telegraph Rd. in our Township. Their are several residential septic tanks that are starting to fail requiring sewer treatment. 4/1/2009

Ash Township

Telegraph Road Sewer Treatment Facility

Ash Township

Ash Township, Monroe

Monroe Stret Water line

City of Auburn Hills

Auburn Hills

CC Water Storage Tank

City of Auburn Hills

Auburn Hills

Opdyke Water Storage Tank

City of Auburn Hills

Auburn Hills

Auburn Road 20" Water Main

City of Auburn Hills

Auburn Hills

Featherstone Road 20" Water Main

City of Auburn Hills

Auburn Hills

Featherstone Road 16" Water Main

City of Auburn Hills

Auburn Hills

Adams Road 12" Water Main

City of Auburn Hills

Auburn Hills

Pontiac Road 12" Water Main

City of Auburn Hills

Auburn Hills

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

City of Auburn Hills

Auburn Hills

City of Auburn Hills

Auburn Hills

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

02262009

Start Date

Water Main Improvements: Over the past several years Ash Township has extended their water distribution system over 18 miles to service residents who’s wells have either dried up or are experiencing high levels of sulfur. In the past, residents relied on water being trucked in. Now approximately 75% of Ash Township residents are serviced with water. There are still many residents in need of water. Extending the water system not only eliminates the need for residents to truck in water but will also help improve the over distribution system by providing much needed looping. The Township also experiences low pressures and low flows in the summer season. Estimated Cost $18,000,000. 4/1/2009

Ash Township

T O

N s

st

e u

q e R

O R

P P A

Run water lines down Monroe Street providing water and new fire protection. 4/1/2009 1.5 Million Gallon elevated water storage tank centrally located at the City Civic Cente Complex Aug., 09

2 years

Funding Request

Route (Infrastructure Only)

D VE $

18,000,000

1 year

$

375,000

1 Year

$

3,725,000

July, 2009

$

Dec., 10

$

925,000 NA Civic Center 4,000,000 Complex

Opdyke Road North of Pontiac Road 1.5 Million gallon elevated water storage tank

Aug., 09

Dec., 10

$

Auburn Road 16" water main improvement Squirrel Road to Opdyke Featherstone Road 20" water main improvement between DWSD Meter and Doris Road

Aug., 09

May, 10

$

Aug., 09

May, 10

$

Featherstone Road 16" water main improvement Doris Road to Opdyke

Aug., 09

May, 10

$

Adams Road 12" water main improvement Auburn Road to South Boulevard. Aug., 09 Pontiac Road 12" water main improvement Pontiac Road from Commonwealth to Five Points Drive Aug., 09

May, 10

$

May, 10

$

Opdyke Road 16" Water Main

Opdyke Road 16" water main improvement Featherstone Road to Walton Boulevard Aug., 09

May, 10

$

Brown Road 12" Water Main Village Center Parking Structure

Brown Road 12" water main improvement Glenmeade Road to Lapeer Road Village Center 200 space parking structure

Aug., 09 Aug., 09

May, 10 March, 11

$ $

5,000,000 Opdyke Road Squirrel Rd. to 2,000,000 Opdyke DWSD meter and 2,500,000 Doris Road Doris Road to 500,000 Opdyke Auburn Rd. to 2,000,000 South Boulevard Commonwealth to 2,000,000 Five Points Dr. Featherstone Rd. 3,000,000 to Walton Blvd. Glenmeade Rd. to 500,000 Lapeer Rd. 3,500,000

River Walk

River Walk master plan development along the Clinton River in the Village Center

Aug., 09

April, 10

$

5,000,000

Taylor Road

Completion of Taylor Road realignment to Lapeer Road

$

Taylor Rd. to 2,000,000 Lapeer Rd.

Sanitary Sewer Rehabilitation Galloway Storm Water Management

Reconstruct the Sanitary Sewer System in the Clinton Oakwood Sanitary Sewer District Completion of the Galloway Storm Water Management project

$ $

Clinton Oakwood Sanitary Sewer 2,100,000 District 5,000,000

tt i m

d e t

ub

S

Project Description

Expected Completion Date

Submitted Requests - Not Approved

Nov., 09 Nov., 09

Nov., 10 April, 10

18 of 1238

Michigan Federal Economic Recovery - Request List

City of Auburn Hills

Auburn Hills

Bloomfield Orchards Water Main

Bloomfield Orchards water main improvement project

June, 09

Nov., 09

Route (Infrastructure Funding Request Only) Bloomfield $ 3,000,000 Orchards

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Joy Road Water Main Dept. of Public Service relocation

May, 09 May, 09

Sept., 09 May, 10

$ $

City of Auburn Hills

Auburn Hills

Hawkwoods Nature Center Cabins

Joy Road water main improvement, sewer rehabilitation, asphalt road reconstruct Reconstruction and relocation of the Department of Public Services facility Reconstruction of the cabins, nature center and lodge at the Hawkwoods Nature Center

April, 09

April, 10

City of Auburn Hills

Auburn Hills

Walton Blvd. Streetscape

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Hawthorne Forrest Pedestrian Pathways

Walton Boulevard streetscape and street lighting from Opdyke Road to Squirrel Road Hawthorne Forrest subdivision curb/catch basin rehabilitation, asphalt road mill and overlay Pedestrian pathway intersection improvements for ADA compliance

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Galloway Trail Link Amberwood Conservation Area

Galloway Trail Link pedestrian pathway from Squirrel Road to Bald Mountain Road connecting to the Hawkwoods Nature Center Amberwood Conservation Area park development

Location City or Township

Submitting Agency

Project Name

Avondale School District

Avondale School District: Auburn Hills, Bloomfield Twp., Troy and Rochester Hills Avondale schools SMART Classrooms

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

02262009

tt i m

d e t

Start Date

O R

A T

Win-Kae Place Road Reconstruction Fletcher Subdivision Drainage Improvement Phase II

ub

Gary and Erie St. Water Main Improvement

PP

May, 09

Sept., 09

1,500,000 Joy Road 15,000,000

D VE $

7,500,000

$

1,000,000

$ $

1,500,000 Hawthorne Forrest 1,500,000

$ $

Squirrel Rd. to Bald 500,000 Mountain Road 500,000

John Pagel, Director of Technology and Elementary 600,000 Principal

My name is John Pagel and I currently have a dual role in the Avondale School Distric (Auburn Hills, MI) of Elementary Principal and District Technology Director. During the past year, I have worked with our District Technology Team to develop plans for SMART classrooms within our district. We have recently installed a fiber network and now have the infrastructure ncessary to capture and distribute educational video content throughout our district. The district vision is to create a central hub for educational video content (including but not limited to: digitized/licensed copies of purchased content, distribution of educational cable television, and district created video content and professional development that can be distributed throughout the district to classrooms that each have a SMART Board, a mounted data projector and sound field system. The project would also allow for live capture of special district events, concerts, sporting events and digital announcements. Teachers and students would then become not only the end users, but also the creators of content that can be used for teaching and learning for years to come. We have installed 9 classrooms a2/1/2009

6/1/2009

$

Install 700 feet of new 8-inch water main from the end of Hidden Road to Lupine Drive. Which will loop the water system to improve water quality and fire flows.

5/1/2009

8/1/2009

$

58,800

Install storm water collection tile in the northwestern streets in Fletcher’s Subdivision 5/1/2009

8/1/2009

$

160,700

Remove approximately 900 feet and a width of 31 feet from back-of-curb to back-ofcurb of existing concrete pavement and subbase and replaced with a new bituminous pavement section consisting of 12 inches of sand subbase, 6 inches of aggregate base, and 3 inches of bituminous pavement. With minor curb and gutter replacement, and approximately 280 lineal feet of the existing storm sewer improvement. 5/1/2009

8/1/2009

$

177,000

Install storm water collection tile in the remaining streets in Fletcher’s Subdivision

5/1/2009

8/1/2009

$

265,000

Extending 450 feet of new 12-inch PVC water main from the existing Bay County Civic Area, located on Shrestha Drive, eastward across the Huron and Eastern Railroad and along the existing Gary Street right-of-way to the intersection of Gary and Chilson Streets. Additional 1,500 feet of 8-inch PVC water main will be installed along Gary and Erie Streets. 5/1/2009

8/1/2009

$

284,000

s

st

e u

q e R

Hidden Road to Lupine Dr. Water Main Loop Fletcher Subdivision Drainage Improvement Phase I

S

Bangor Township

Project Description

Expected Completion Date

O N

Submitted Requests - Not Approved

19 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bangor Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Project Name

Project Description

Start Date

Euclid Ave. - Beaver Rd. to Tobico Beach Water Main

Replacing 2,600 lineal feet of aged and/or undersized existing water mains with a 12inch PVC water main. The new main will extend from the existing 24-inch main at Beaver Road northward along North Euclid Avenue to Tobico Beach Road where it wi be connected to an existing 10-inch water main. An existing 8-inch water main at Killarney Beach Road and approximately five existing 1-inch water services will also be reconnected. 5/1/2009

Expansion of Township Hall

Purchase of adjacent property for expansion of township hall. Our township hall is a hub for our community with many rentals for wedding receptions, family reunions, community events and is in need of more facilities, ie bathrooms, kitchen facility, gathering/meeting rooms. Desire is to purchase adjacent property, demolish existing structure and construct addition to our township hall with small park/sitting area on grounds. 8/1/2009

Banks Township, Antrim County

Expansion of Township Hall

Purchase of adjacent property for expansion of township hall. Our township hall is a hub for our community with many rentals for wedding receptions, family reunions, community events and is in need of more facilities, ie bathrooms, kitchen facility, gathering/meeting rooms. Desire is to purchase adjacent property, demolish existing structure and construct addition to our township hall with small park/sitting area on grounds. 8/9/2009

Banks Township

Atwood is small rural village along US 31 corridor. Desire to place 20-30 street lamp posts along business corridor to improve visibility and improve aesthetics of the New Street Lighting in rural village of Atwood community. 6/1/2009

Bangor Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township

Banks Township, Antrim County

02262009

T O

8/1/2009

N s

D VE $

307,950

9/1/2010

$

Infrastructure & Economic 500,000 Development

9/10/2009

$

500,000

O R

P P A

Funding Request

Route (Infrastructure Only)

10/1/2009

$

Infrastructure & Economic 90,000 Development

Township Hall Lighting

Historic Township Building, built in 1930's with WPA funds, lacks energy efficiency lighting. Building lighting currently consists of 10 300W lamps in the ceiling to illuminate a large auditorium. Seeking funds to replace existing with new energy efficient lighting fixtures.

5/1/2009

7/1/2009

$

Energy & Natural 8,000 Resources

Township Hall Insulation

Historic Township Building, built in 1930's with WPA funds, no insulation when constructed, lacks energy efficiency. Windows have been changed within 20 years to more energy efficient. Seeking funds to thoroughly insulate historic building to modern standards. 5/1/2009

7/1/2009

$

Energy & Natural 20,000 Resources

Township Hall Heating & Cooling Upgrade

Historic Township Building, built in 1930's with WPA funds, needs more energy efficient heating and cooling systems. Currently using 3 furnaces with LP fuel to heat the building. Desire to replace with geothermal heating/cooling units. 6/1/2009

10/1/2009

$

Energy & Natural 40,000 Resources

t s e

u q e

R d

Replace two old fire dept tanker trucks

Desire to replace two old gasoline powered fire department water tanker trucks with two new diesel powered tanker trucks. Old trucks currently have leaks in the water tanks and engines lack power to climb the many hills within the township. In dire need to replace these two trucks soon for the safety of personnel, property owner assets and improve efficiencies. 5/1/2009

Improve Internet Access

Ellsworth is small community of less than 400 residents with limited high speed internet access. Desire is to improve wireless high speed availability with hotspot with a new antenna on the township hall. 7/1/2009

e t t

t i m

b u S

Banks Township

Expected Completion Date

5/1/2010

10/1/2009

$

Infrastructure & Economic 500,000 Development

$

Infrastructure & Economic 10,000 Development

Infrastructure & Economic 750,000 Development

C-48 upgrade to Class A Road

Upgrade portion of main trunk line east to west within the township, connecting to adjacent city. Upgrade to establish Class A standards for purpose of job development and retention. Currently, businesses must travel an additional 23 miles to deliver goods & services during the spring load limit season. The top three employers within the local village are transportation based employers. 5/1/2009

9/1/2009

$

Township Hall Lighting

Historic Township Building, built in 1930's with WPA funds, lacks energy efficiency lighting. Building lighting currently consists of 10 300W lamps in the ceiling to illuminate a large auditorium. Seeking funds to replace existing with new energy efficient lighting fixtures.

7/9/2009

$

Submitted Requests - Not Approved

5/9/2009

8,000

20 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

7/9/2009

Township Hall Heating & Cooling Upgrade

Historic Township Building, built in 1930's with WPA funds, needs more energy efficient heating and cooling systems. Currently using 3 furnaces with LP fuel to heat the building. Desire to replace with geothermal heating/cooling units. 6/9/2009

10/9/2009

Replace two old fire dept tanker trucks

Desire to replace two old gasoline powered fire department water tanker trucks with two new diesel powered tanker trucks. Old trucks currently have leaks in the water tanks and engines lack power to climb the many hills within the township. In dire need to replace these two trucks soon for the safety of personnel, property owner assets and improve efficiencies. 5/9/2009

Banks Township, Antrim County

Improve Internet Access

Ellsworth is small community of less than 400 residents with limited high speed internet access. Desire is to improve wireless high speed availability with hotspot with a new antenna on the township hall. 7/9/2009

Banks Township, Antrim County

Atwood is small rural village along US 31 corridor. Desire to place 20-30 street lamp posts along business corridor to improve visibility and improve aesthetics of the New Street Lighting in rural village of Atwood community. 6/9/2009

Banks Township, Antrim County

Banks Township

Banks Township, Antrim County

Banks Township

Banks Township Bark River-Harris Schools Bark River-Harris Schools Bark River-Harris Schools Bark River-Harris Schools Bark River-Harris Schools Bark River-Harris Schools

Funding Request

$

20,000

$

40,000

5/10/2009

$

500,000

10/9/2009

$

10,000

10/9/2009

$

90,000

Road Improvement

Upgrade portion of main trunk line east to west within the township, connecting to adjacent city. Upgrade to establish Class A standards for purpose of job development and retention. Currently, businesses must travel an additional 23 miles to deliver goods & services during the spring load limit season. The top three employers within the local village are transportation based employers. 5/9/2009

9/9/2009

$

Harris / Harris Twp

Gym Lighting

Replace and upgrade gym lights

Harris / Harris Twp

Boiler project

Replacement of two boilers

Harris / Harris Twp

Security System

Harris / Harris Twp

Clock system

Harris / Harris Twp

Computer Lab Upgrade

Harris / Harris Twp

Security Fencing

Banks Township, Antrim County

T O

itt

u S Baroda Township

Start Date

Township Hall Insulation

Banks Township, Antrim County

Banks Township

Project Description

Historic Township Building, built in 1930's with WPA funds, no insulation when constructed, lacks energy efficiency. Windows have been changed within 20 years to more energy efficient. Seeking funds to thoroughly insulate historic building to modern standards. 5/9/2009

Banks Township

Banks Township

Project Name

Expected Completion Date

Baroda Twp

02262009

bm

Sanitary Sewer System Extension

C-48 upgrade to 750,000 Class A Road

st

5/1/2009

6/30/2009

$

15,000

5/1/2009

6/30/2009

$

56,000

Security in a new door locking system

5/1/2009

6/30/2009

$

18,000

Student transition and time management

5/1/2009

6/30/2009

$

20,000

Replace 32 computers in main lab

5/1/2009

6/30/2009

$

25,000

Safe Guard the students and facility

5/1/2009

6/30/2009

$

30,000

e u

d e t

N s

P P A

O R

D VE

q e R

Baroda Township was requested to look into extending sanitary sewers into a residential portion of their community on the west side of the Village of Baroda. The homes in this area are forty to sixty years old. The native soils in the area are a heavy soil and there is a high groundwater table. These two conditions are not at all favorable for septic fields. The septic fields for these homes have failed. The life cycle for a typical septic field is ten to twenty years. Recently, some homeowners have replaced their septic fields. This activity and associated costs have caused the homeowners to approach the Township to look at costs for extending the sanitary sewers from the village into this area of the township. Various scenarios were explored and project costs were estimated. These results were presented to the homeowners and the decision was made to table the project until a later date. 4/1/2009

Submitted Requests - Not Approved

12/1/2009

$

Route (Infrastructure Only)

Cleveland Ave from Church Street to Jayme Dr, Mariane Dr from Russell Road to Marlen Dr amd Amy Dr from Russell Rd to Marlen Drive, Marlen Dr from Cleveland Ave to Mariane Dr and Russell Rd from Cleveland Ave to 1,400,000 Mariane Dr

21 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Barton Township

Barton Township

Barton Township

E.17 mile Barton Twp.

Beech Ave. Barton Twp.

E.17 mile Barton Twp.

Project Name

Project Description

New Town hall

Beech rd. paving

Grub,grade,gravel and pave Beech Ave. from 16 mile 4300' North. This section of Beech Ave. has been Prepared for paving by Grubing,grading and graveling. Cost to complete was $14,468.10 Newaygo County Road Commission Project # 488.01.02

17 mile paving

Grub,grade,gravel and pave 17 mile from Cypress 11/2 miles west to entrance of Golf Course. 17 mile has had some preperation work finished in 2007. This preperation work consisted of Grub, grade and gravel of approximatly 1/2 mile between Cypress and elm cost to the Township was $42,791.71 Newaygo County Road Commission Project # 488.01.01

Bay Arts Council Masonic Temple Restoration/Repurposing

Bay Arts Council’s Masonic Temple has 3 usable floors and a 4th floor attic space. Each floor is approximately 9600 SF of space. Building height is approximately 50’. Project includes stabilization and upgrading of historically significant building. Emphasis on efficient systems, care and repair of structure to control energy usage. After renovations, the building will look like it did in the late 19th, early 20th century and function like a 21st century building. Exterior: excavate/repair/waterproof foundation, install drain tile, connect to sump pump Repair/Clean/Seal Sandstone & Terra Cotta, Clean & Tuck point brick Restore clay tile Mansard Roof Replace built-up roof with energy-efficient membrane roofing, insulation and flashing Restore, paint, retrofit double hung windows with insulated glass Interior: Install new electrical system and distribution Install general power and lighting Remove existing steam system, install HVAC system with VAV boxes for control and zoning options Remove existing plumbing pipes and fixtures, replace all sanitary & supply lines, install lines for new w/in 90 days of toilet rooms and catering kitchen, install hot water heater and fixtures, all gas piping Infunding award

Upgrade the 30 year old West Bay County Regional Wastewater Treatment Plant. "Green" design elements will include: 1) Design to Leadership in Energy & Environmental Design (LEED) standards 2) 30% aeration energy reduction by converting aeration system from "coarse bubble" to "fine pore" aeration and installation of variable frequency drives 3) Heating, ventilating and air conditioning (HVAC) energy reduction by replacing current HVAC systems with a geothermal HVAC system using plant effluent water as the water source 4) Building energy savings by replacing building exterior walls panels with new energy efficient panels 5) Improve operational efficiency by expansion of the treatment plants supervisory control and data acquisition system (SCADA) 6) Reduced stormwater generation through installation of native vegetation and permeable concrete surfaces 7) Reduced toxic chemical usage by replacement of chlorine disinfection system with ultraviolet (UV) disinfection 8) Completion of solar and wind turbine investigations during design to determine the cost-effectiveness of installing these renewable energy sources 9) CoMay, 2009

A T

t s e

Bay City

e t tt

b u S

Bangor Township, County of Bay Wastewater Treatment Plant Improvements

02262009

O R ?

$

280,000

$

142,953

$

278,817

w/in 1 year from start

$

3,839,882

May, 2010

$

26,056,000

PP

u q e

Submitted Requests - Not Approved

Funding Request

D VE

O N

R d

i m

Bay County Dept of Water & Sewer

Start Date

Barton Twp. Owns 27 acres that has a small park and building with pit style toilets. This building was rented out 45 times in 08' the building is small and substandard for this use. The Township hall is the 100 plus year old converted school house that is non-compliant for handicap use. This building is tearably outdated and in need of major repairs and renovations, roof, furnace,Etc.. A new Township hall at the park property would eliminate the need for two seperate locations and would serve as a rental hall as well as Township hall and offices. All Township officials are currently When funding is keeping office space in their homes due to substandard building space. available

s

Bay Arts Council, Inc

Expected Completion Date

Route (Infrastructure Only)

22 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bay County Dept of Water & Sewer Bay County PSA

Project Name

Project Description

Start Date

Redirect Hampton Township, Portsmouth Township and City of Essexville's Wastewater to the West Bay County Regional Wastewater Treatment Plant. "Green' design elements will include: 1) Design to Leadership in Energy & Environmental Design (LEED) standards 2) Construction of 36 million gallon earthen retention basin and internal pumping station and piping to address increased wet weather event Hampton Township, severity due to climate change and eliminate all future sanitary sewer overflows from Portsmouth Township, the West Bay County Regional Wastewater Treatment Plant 3) Wastewater overflows City of Essexville, Bangor from the City of Bay City's wastewater collection system will be reduced 4) Township (all in the Wastewater overflows from the City of Essexville's combined sewer overflow basin County of Bay) Wastewater Collection System Improvements will be reduced May, 2009 Bay City new gym and enlarge kitchen 7/1/2009

Essexville/Hampton Township

Ann Arbor Beaver Island Bedford Township, Monroe County

Liquid Propane (LP) is the least expensive and most abundant US Alternative Fuel (AF); 90% U.S. produced and environmentally beneficial as Compressed Natural Gas (CNG), has wider retail distribution than CNG, E85 or biodiesel, and is prioritized by the EPA for all AF and Alternative-Fuel Vehicle (AFV) subsidies. Public use is limited by a lack of LP-using engines on the road. Though LP-vehicle production is multiplying, retrofitting millions of vehicles can increase use of this superior AF now. Michigan has the 3rd largest US supply of LP and can be a national leader. Widespread retrofit and LP distribution programs will create thousands of jobs in 3-18 months. The Diesel Magnum (successfully tested by Ford Mo. Co. and Georgia Tech) is a retrofit system that inject 30+% LP into a Diesel engine, increasing its MPGs by 20-45%; Vogas+ retrofit systems inject 90+% LP into a gasoline engine. Both lower fuel cost; reduce NOx and particulate emissions’ and cost $5,000 installed. The Diesel Magnum Introductory Retrofitts to Propane Education & Research Council (PERC) sees them as the most cost Advance LP as Alternative Fuel effective, easily distributed method to increase LP use – now – benefiting the economy4/1/2009 Road Commission Facility Bedford Charter Township Fire Station No. 56 Addition to dormitory, new apparatus bay, new special equipment bay and interior construction renovations for training. 5/15/2009

BCD, Inc. & 21st Century Fuels, LLC Beaver Island Bedford Township

d e tt

t i m

ub

S Bellaire Public Schools

02262009

q e R

N s

st

e u

Bellaire Public Schools

Purchase wireless hubs plus Power Over Ethernet Hubs to make both school buildings in the district completely wireless. The addition of this technology would enable the students and community to have unlimited access to the latest technology available. It would increase the connectivitiy to ensure that no areas within the district are without broadband access. 7/1/2009

Submitted Requests - Not Approved

O R

P P A

Creation of a waterfront environmental education center for delivering K-12 curriculum based science lessons and for promoting stewardship and awarness of the Saginaw River, Saginaw Bay, and Great Lakes. These programs will complement BaySail's existing shipboard science programs (established in 1997) that have served over 28,000 students. The center will be a model of green design with solar energy systems, on-site stormwater management, extensive green roof, rain water cistern, permeable parking area, and a greenhouse for propigating native species. The center will also include two classrooms, outdoor education areas, a raised walkway over the wetlands, and a pier for mooring BaySail's two schooners. Student capacity will be approximately 16,500 annually. The center will be located on 3.0 acres of Saginaw River property donated to BaySail by the US Coast Guard in 2006. The project will include restoring the wetlands on this property through invasive species control and 6/1/2009 Saginaw Bay Environmental Education Center native species growing projects.

T O

BaySail

Expected Completion Date

May, 2010 11/1/2009

Funding Request

Route (Infrastructure Only)

D VE $ $

32,050,000 910,000

10/30/2009

$

1,670,000

1/1/2010

$ $

5,000,000 870,000

Nov. 1, 2009

$

1,017,000 NA

12/31/2009

$

30,000

23 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

12/31/2009

Bellaire Public Schools

Connect the elementary building with the village sewer system. This was a component of a previous bond proposal but had to be removed due to the cost of the project. Prelimnary plans are still available. 7/1/2009

12/31/2009

Bellaire Public Schools

Addition of interactive whiteboards technology for six (6) classrooms to integrate technology into the classroom and curriculum to help increase student achievement, as well as to prepare students for the 21st century learning model. 6/1/2009

Bellaire Public Schools

Purchase of fifteen (15) document cameras that connect to teacher computer work stations. These cameras allow the entire class to view what is being displayed on the teacher workstation. 7/1/2009

Bellaire Public Schools

Purchase additional "leveled readers" for our READ 180 program. Also puchase additional materials and an additional ten (10) site licenses for the READ 180 program. These purchases will allow us to service additional students who are struggling with reading and are at least two grade levels behind where they should be at this time. 7/1/2009

Bengal Township, Clinton County Bengal Township Hall

Construction of a new township hall to replace the existing hall which was built around 1850 with no restrooms or running water. The township does not own the land that the existing hall sits on. 7/1/2009

Benton Harbor

Benton Harbor Charter School

HVAC renovation to provide energy efficiency.

Benton Harbor

Benton Harbor Charter School

Benton Harbor

Benton Harbor Charter School

Renovation of approximately 40,000 sq ft for expansion of K-8 program. To enhance technology with wireless broadband connectivity, two modern computer labs, and classroom smart boards.

Bellaire Public Schools Bellaire, MI

Bellaire Public Schools

Bellaire Public Schools

Benton Harbor

d e tt

Benton Harbor Public Library Renovation/Expansion

t i m

b u S Berlin Township

Start Date

Bellaire Public Schools

Bellaire Public Schools

Benton Harbor Public Library

Project Description

Purchase of a new telephone system for the entire school district (two buildings). The current system is more than 10-12 years old and needs to be replaced. This would add to the safety of all students and staff and allow for better communication with student families. 7/1/2009

Bellaire Public Schools

Bengal Township Benton Harbor Charter School Benton Harbor Charter School Benton Harbor Charter School

Project Name

Expected Completion Date

Berlin Township, MI

02262009

Sanitary Sewer Extension

Funding Request

Route (Infrastructure Only)

$

40,000

$

200,000

$

9,000

8/31/2009

$

8,000

8/31/2009

$

15,000

Dec. 31, 2009

$

400,000

8/1/2009

$

750,000

12/1/2009

$

3,000,000

8/1/2009

$

150,000

This project in intended to completely renovate and expand the Benton Harbor Public Library. The project will bring the Library into compliance with ADA/Handicapped accessibility requirements. It will also "green" the Library by replacing the HVAC systems for energy efficiency, replacing windows with modern glazing materials, installing a "green" roof, and using other energy saving methods. It will update the wiring and other areas for modern technology needs. It will bring the building into compliance with current building codes. It will completey reconfigure the interior for maximum use of available space. Finally, the renovated Library will serve as an archo and drawing card for the ongoing rebuilding of downtown Benton Harbor. 8/1/2009

7/1/2010

$

4,000,000 N/A

Sanitary Sewer Improvement and Extension Projects: Berlin Township has taken the incentive to provide its residents with sanitary sewers. As stated above they built their own WWTP in the 1970’s. Also, as stated above Berlin Township is located along the western shores of Lake Erie. The existing sanitary sewer system needs to be extended in order to eliminate septic fields and to improve improved water quality. There are many residents within the Township who are still on septic fields. Given Berlin Township borders the shores of one of our Great Lakes it is important from an environmental standpoint that the Township eliminate the septic fields. Water quality is a top priority. The new sanitary sewer extension projects could be ready for construction in approximately 120 –180 days. Estimate Cost of the project ready for construction is $8,500,000.

3-4 Years

$

8,500,000

A T

e u

st

q e R

s

PP

O N

Submitted Requests - Not Approved

O R 8/31/2009

D VE

24 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Berlin Township

Berlin Township

Berlin Township

Berlin Township

Berlin Township, MI

Berlin Township, MI

Berlin Township, MI

Berlin Township, MI

Project Name

Project Description

Expected Completion Date

Start Date

WWTP IMProvements

Berlin Township Waste Water Treatment Plant (WWTP) Improvements: The Berlin Township WWTP was built in the 1970’s. Berlin has performed several upgrades, however, with the new clean water requirements and environmental standards the WWTP is in need for even further upgrades. Recently, the EPA guidelines changed and Berlin Township’s WWTP is struggling to remain in compliance. New the WWTP needs new aeration and clarification upgrades. The distribution chamber is the original chamber and is deteriorating and the valves do not function correctly. 180 Days

Water Main Looping

Water Main Looping: Throughout the past 10 years Berlin Township has taken the incentive to provide its residents with water. The new water main projects have eliminated wells and improved water quality. There are several areas within the Township where residents are still on wells and areas that have dead end lines. In order to eliminate wells, improve the water quality and water pressure additional water mains need to be added and dead end lines need to be looped. There are several projects completed and the project is ready to bid immediately. There are other projects could be ready for construction in approximately 90 –120 days. 120 days

D VE $

10,500,000

2-3 Years

$

10,500,000

Berlin Pump station #6

Berlin Township Pump Station #6: In 2008, Berlin Township upgraded two of their undersized pumping lift stations. Pump Station #7 was completely upgraded, however, there was not enough funds available to completely upgrade Pump Station #6. In 2008 the pumps were replaced to help alleviate the problems. The existing station is undersized, deteriorated and needs to be completely upgraded. The plans for this project are complete and the project is ready to bid immediately. Construction could begin within 30 day of approval. ASAP

90 days

$

450,000

Estral Beach Sanitarty Sewer Lead Lining

Estral Beach Slip Lining Sanitary Sewer House Leads: Estral Beach is a Village located along the shores of Lake Erie. In 2001, the Township slip lined the main line sewer but did not have the funds to slip line the house leads. The house leads produce a considerable amount of Inflow & Infiltration (I&I) into the sanitary sewer system. The plans for this project are complete and the project is ready to bid immediately. Construction could begin within 30 day of approval. ASAP

120 Days

$

1,300,000

18 months after construction begins

$

2,600,000

T O

3-4 Years

Funding Request

O R

P P A

N s

t s e

u q e

Route (Infrastructure Only)

R d

Berrien County

ub

Berrien Twp, Berrien County, MI

02262009

i m

S

e t tt

Berrien County Animal Control

In 1998 and again in 2005, the Berrien County Board commissioned master plans for the replacement of the County's Animal Control Shelter. It was determined that renovation of the existing facility was simply not cost effective. The public has become more sensitive to the needs of animals, and animal control shelters have become more sophisticated. Shelters are brighter, more airy, and technological advancements have created new materials that do a better job of meeting a shelter’s needs, specifically in controlling the spread of disease and energy consciousness. Since this is a rural site, consideration has been given to installing wind turbines as an alternative energy source. A 12,367 ft2 facility has been proposed on property Construction will already acquired by the County for this purpose. This is 1,150 ft2 larger than the begin 6 months existing facility which will house more animals and permit a more efficient operation. after award

Submitted Requests - Not Approved

25 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Berrien County Jail

The Berrien County Jail currently has three floors and 112,000 ft2 of floor space. It was originally constructed in 1951 and added on to in 1981. The inmate population has exceeded the “safe classification” (273) capacity in every year since 1995. It has exceeded the State rated capacity (341) in every year since 1995 except in 2008. Extreme measures were implemented that year by restricting the number and term of DOC inmates, expanding the use of alternative sentencing programs, reducing bond requirements, and early releases. While successful in reducing the numbers over this relatively short period, these methods have increased the risk to public safety and reduced the overall effectiveness of incarceration. The County is just finishing a master plan of a new facility which will increase capacity by 47% and provide a safe and secure environment for the staff and inmates. The project will also include new Construction will 28 months after parking for the Jail and Courthouse. The County currently owns the property on which begin 14 months construction it intends to build the new facility. after award begins

$

44,850,000

Nurse Family educator

Pediatric nurse public health educators with directly with teen mothers and low income mothers and families from pregnacy through early childhood to assure positive human development outcomes reducing child abuse, learning disabilities will increasing the capacity of low income mothers and families to raise healthy children and prepare them for academic success 6/1/2009

6/1/2011

$

1,200,000

Baroda Township

Sparling and Gonder Drain

The propert owners in this draiange district have had drainage issues recently due to the accumulation of silt in the open channel and failed pipe sections in the balance of the project. As a result of these inadequaccies, the homeowners have been unable to move storm water from their basements as well as from their yards and fields. This project would update the drain with properly sizes pipe and an open channel which could adequatley handle the flow. The project would redistribute the trench and channel spoils on to the adjacent properties. 4/9/2009

7/9/2009

$

Landon Road North 220,000 of Browntown Road

Bainbridge

Biastock Road

Territorial to North Branch-Resurface 1.5 miles

5/1/2009

11/1/2009

$

220,000

Baroda

insulation-Baroda Garage

Insulate Building

5/1/2009

11/1/2009

$

12,000

Baroda

Metal Siding-Baroda Garage

Install Sheet Metal Siding

5/1/2009

11/1/2009

$

24,000

Baroda

Salt Storage-Baroda Garage

5,500 Ton Salt Storage (60 x 100)

5/1/2009

11/1/2009

$

181,000

Baroda

Ruggles Road

Hills to Hinchman-Resurface 1.4 miles

5/1/2009

11/1/2009

$

210,000

Baroda

Hills Road

Freehling to Snow Road-Resurface 2.0 miles

5/1/2009

11/1/2009

$

320,000

Jericho to Cleveland-Resurface 2.0 miles

5/1/2009

11/1/2009

$

320,000

Garage Access Door-Benton Harbor Garage

Install North Garage Access Door

5/1/2009

11/1/2009

$

40,000

Drain Field-Benton Harbor Garage

Connect Sanitary Sewer – Drain Field

5/1/2009

11/1/2009

$

50,000

Pipestone Road

Clean & Video Storm Sewer System-1.9 miles

5/1/2009

11/1/2009

$

70,000

O R

Berrien County

Berrien County DOH

Berrien County Drain Commissioner Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission

Funding Request

Route (Infrastructure Only)

St. Joseph, MI

Benton Harbor

Benton Benton Benton

S

Hinchman Road

eq

N s

st

e u

R d

e t t

it

m b u

Baroda/Lake

T O

P P A

D VE

Benton

Separate Floor Drains-Benton Harbor Garage Connect Sanitary Sewers-Separate Floor Drains

5/1/2009

11/1/2009

$

89,000

Benton

Generator-Benton Harbor Facility

Install generator for power failure-Admin Building & Garage

5/1/2009

11/1/2009

$

150,000

Benton

Empire Avenue

Euclid to Benton Center-Resurface 0.8 mile

5/1/2009

11/1/2009

$

160,000

02262009

Submitted Requests - Not Approved

26 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Benton

Salt Storage Facility-Benton Harbor Garage

5,500 Ton Salt Storage (60 x 100)

5/1/2009

11/1/2009

$

181,000

Benton

Britain Avenue

Benton Harbor City Limits to Crystal-Resurface 1.0 mile

5/1/2009

11/1/2009

$

250,000

Benton

Highland Avenue

Benton Harbor City Limits to Crystal-Resurface 1.0 mile

5/1/2009

11/1/2009

$

300,000

Benton

Yore Avenue

Napier to Empire -Resurface 0.9 mile

5/1/2009

11/1/2009

$

300,000

Benton

Napier Avenue

Broadway to M-139-Mill&fill 0.6 mile

5/1/2009

$

350,000

Benton

Napier Avenue

Plaza Drive to I-94-Mill&fill 1.1 miles

5/1/2009

11/1/2009

$

550,000

Benton/St. Joseph

Napier Avenue

Clean & Video Storm Sewer System-3.4 miles

5/1/2009

11/1/2009

$

150,000

Berrien

Huckleberry Road

Pokagon to Eau Claire-Resurface 1.8 miles

5/1/2009

11/1/2009

$

300,000

Berrien

Eau Claire Road

Hochberger to Hipps Hollow-Resurface 1.6 miles

5/1/2009

11/1/2009

$

400,000

Berrien

Hochberger Road

Eau Claire to Pipestone-Resurface 1.8 miles

5/1/2009

11/1/2009

$

475,000

Berrien/Niles

Fairland Road

Old Us 31 to M-140-Resurface 1.8 miles

5/1/2009

11/1/2009

$

300,000

Bertrand

Chamberlain Road

Rynerson to Mayflower-Resurface 0.9 miles

5/1/2009

11/1/2009

$

190,000

Bertrand

Mayflower Road

Chicago to US 12-Resurface 0.8 mile

5/1/2009

11/1/2009

$

220,000

Bertrand

Buffalo Road

Red Bud to Mayflower-Resurface 2.0 miles

5/1/2009

11/1/2009

$

250,000

Buchanan

Insulation-Bakertown Garage

Insulate Building

5/1/2009

11/1/2009

$

12,000

Buchanan

Metal Siding-Bakertown Garage

Install Sheet Metal Siding

5/1/2009

11/1/2009

$

24,000

Buchanan

Furnace-Bakertown Garage

New Furnace

5/1/2009

11/1/2009

$

40,000

Buchanan

Salt Storage-Bakertown Garage

3,400 Ton Salt Storage (60 x 80)

5/1/2009

11/1/2009

$

136,000

Buchanan

Miller Road

Madron Lake to Red Bud-Resurface 2.8 miles

5/1/2009

11/1/2009

$

420,000

Buchanan

Wagner Road

Boyle Lake Road to Madron Lake-Resurface 2.9 miles

5/1/2009

11/1/2009

$

450,000

Cleveland to Garr Road-Resurface 5.3 miles

5/1/2009

11/1/2009

$

850,000

m b u

O N

R d

e t t

it

st

e u

eq

s

A T

PP

O R 11/1/2009

D VE

Buchanan/Weesaw

Glendora Road

Chikaming

Harbert Road

Prairie to Flynn-Resurface 2.0 miles

5/1/2009

11/1/2009

$

350,000

Flynn Road

Warren Woods to Sawyer-Resurface 3.0 miles

5/1/2009

11/1/2009

$

460,000

Lake Shore Road

Red Arrow to Red Arrow-Resurface 4.6 miles

5/1/2009

11/1/2009

$

750,000

Friday Road

Mountain to Coloma City Limits-Resurface 0.5 mile

5/1/2009

11/1/2009

$

100,000

Coloma

Becht Road

Little Paw Paw Lake to Hagar Shore-Resurface 1.0 mile

5/1/2009

11/1/2009

$

120,000

Coloma

Paw Paw Avenue

Paw Paw Lake to Township Line-Resurface 0.7 mile

5/1/2009

11/1/2009

$

200,000

Chikaming Chikaming Coloma

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

27 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Coloma

Red Arrow Highway

Boyer to Coloma City Limits-Resurface 0.9 mile

5/1/2009

11/1/2009

$

350,000

Coloma

N. Coloma Road

Little Paw Paw Lake to Hagar Shore-Reconstruct 1.0 mile

7/1/2009

8/1/2010

$

800,000

Galien

Olive Branch Road

Nye to Cleveland-Resurface 1.3 miles

5/1/2009

11/1/2009

$

200,000

Galien

Buffalo Road

Hampton to Cleveland-Resurface 2.3 miles

5/1/2009

11/1/2009

$

360,000

Hagar

Martin Road

Little Paw Paw Lake to Hagar Shore-Resurface 1.0 mile

5/1/2009

$

120,000

Hagar

Zoschke Road

Paw Paw to Eaman-Resurface 1.0 mile

5/1/2009

11/1/2009

$

125,000

Hagar

Riverside Road

Coloma to Martin Road-Resurface 2.6 miles

5/1/2009

11/1/2009

$

400,000

Hagar/Benton

Riverside Road

Paw Paw to Chabot-Resurface 3.7 miles

5/1/2009

11/1/2009

$

600,000

Lake

California Road

Bridgman to Red Arrow Highway-Resurface 0.3 mile

5/1/2009

11/1/2009

$

100,000

Lincoln

Red Arrow Highway

Stevensville City Limits to I-94-Mill & fill 0.9 mile

5/1/2009

11/1/2009

$

350,000

Lincoln

Washington Avenue

John Beers to Linco-Resurface 2.0 miles

5/1/2009

11/1/2009

$

350,000

Lincoln

John Beers Road

Washington to Cleveland-Reconstruct 0.5 mile

5/1/2009

11/1/2009

$

400,000

Lincoln

Red Arrow Highway

Linco to Stevensville City Limits-Mill&fill 1.3 miles

5/1/2009

11/1/2009

$

450,000

Lincoln

Lincoln Avenue

John Beers to Maiden Lane-Resurface 2.5 miles

5/1/2009

11/1/2009

$

650,000

New Buffalo

Townline Road

Lake Shore West to End-Resurface 0.6 mile

5/1/2009

11/1/2009

$

100,000

New Buffalo

Yasko Road

Wilson to Maudlin-Resurface 1.0 mile

5/1/2009

11/1/2009

$

125,000

New Buffalo

Wilson Road

US 12 to M 239-Reconstruct 2.9 miles

5/1/2009

11/1/2009

$

1,500,000

New Buffalo

Maudlin and Hoder Roads

Reconstruction-1.7 miles and install sanitary sewer

5/1/2009

11/1/2009

$

2,680,000

Niles

East Main St.

Niles City Limits to County Line-Resurface 0.7 mile

5/1/2009

11/1/2009

$

200,000

Niles

Philip Road

Niles-Buchanan to St. Joe River-Resurface 2.0 miles

5/1/2009

11/1/2009

$

350,000

Bertrand to Fort-Resurface 2.7 miles

5/1/2009

11/1/2009

$

400,000

Third Street/State Line

State Line to Fulkerson-Resurface 1.8 mile

5/1/2009

11/1/2009

$

450,000

Lemon Creek Road

Scottdale to Garr-Resurface 1.5 miles

5/1/2009

11/1/2009

$

220,000

Snow Road

Red Bud to US 131-Resurface 0.9 mile

5/1/2009

11/1/2009

$

250,000

Hochberger Road

Pipestone to Sinclair-Resurface 1.5 miles

5/1/2009

11/1/2009

$

220,000

Pipestone

Naomi Road

Park to M-140-Resurface 3.5 miles

5/1/2009

11/1/2009

$

550,000

Royalton

Tilly Road

Marquette Woods to John Beers-Resurface 1.0

5/1/2009

11/1/2009

$

150,000

Bond Street

Niles Oronoko Oronoko Pipestone

02262009

S

O N

R d

e t t

it

m b u

Niles

st

e u

eq

s

A T

Submitted Requests - Not Approved

PP

O R 11/1/2009

D VE

Route (Infrastructure Only)

28 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Royalton

Miners Road

M-139 to End-Reconstruct 1.5 miles

5/1/2009

11/1/2009

$

500,000

Royalton

Marquette Woods Rd.

Cleveland to M-139-Resurface 3.6 miles

5/1/2009

11/1/2009

$

670,000

Sodus

Sodus Parkway

Clean & Video Storm Sewer System-2.3 miles

5/1/2009

11/1/2009

$

100,000

Sodus

Hillandale Road

Pipestone to Naomi-Resurface 1.7 miles

5/1/2009

11/1/2009

$

280,000

Sodus

Pipestone Road

Park to Naomi-Resurface 4.3 miles

5/1/2009

$

1,050,000

St. Joseph

Hilltop & Washington

Clean & Video Storm Sewer System-1.0 mile

5/1/2009

11/1/2009

$

90,000

St. Joseph

Nelson Road

Cleveland to Washington-Resurface 0.5 mile

5/1/2009

11/1/2009

$

100,000

St. Joseph

Fairplain

Jakway to Napier-Resurface 0.8 mile

5/1/2009

11/1/2009

$

160,000

St. Joseph

Napier Avenue

St. Joe River to Broadway-Mill&fill 1.2 miles

5/1/2009

11/1/2009

$

500,000

St. Joseph

Cleveland Avenue

I-94 to Hilltop-Mil&fill 2.1 miles

5/1/2009

11/1/2009

$

550,000

Three Oaks

Drain Field-Three Oaks Garage

Connect Sanitary Sewer – Drain Field

5/1/2009

11/1/2009

$

26,000

Three Oaks

Separate Floor Drains-Three Oaks Garage

Connect Sanitary Sewers-Separate Floor Drains

5/1/2009

11/1/2009

$

34,000

Three Oaks

Salt Storage Facility-Three Oaks Garage

3,400 Ton Salt Storage (60 x 80)

5/1/2009

11/1/2009

$

136,000

Three Oaks

Basswood Road

Kruger to Elm Valley-Resurface 0.9 mile

5/1/2009

11/1/2009

$

190,000

Three Oaks

Schwark Road

Forest Lawn to US 12-Resurface 1.5 miles

5/1/2009

11/1/2009

$

220,000

Three Oaks

Building Expansion Three Oaks Garage

Building Expansion

5/1/2009

11/1/2009

$

225,000

Three Oaks

Three Oaks Road

Three Oaks to State Line-Resurface 2.4 miles

5/1/2009

11/1/2009

$

400,000

Three Oaks

Forest Lawn Road

Basswood to Lakeside-Reconstruct 1.1 mile

7/1/2009

8/1/2010

$

750,000

Various

Clean Drainage Structures-Primary system

County wide-1,000 primary structures

5/1/2009

11/1/2009

$

80,000

Various

Clean Drainage Structures-Local system

County wide-1,200 local structures

5/1/2009

11/1/2009

$

100,000

Concrete Bridge Decks-Local System

County wide-12 local bridges

5/1/2009

11/1/2009

$

200,000

County wide

Seal Cracks in Concrete Bridge Decks-14 Bridges

5/1/2009

11/1/2009

$

500,000

Gravel Local Roads

Add 8” gravel local roads-177.9 miles

5/1/2009

11/1/2009

$

8,100,000

Countywide

Upgrade Guardrail-20 miles

7/1/2009

8/1/2010

$

3,100,000

Village of Eau Claire

Salt Storage-Eau Claire Garage

3,400 Ton Salt Storage (60 x 80)

5/1/2009

11/1/2009

$

136,000

Watervliet

Bowe’s Landing Sub

Watervliet Township-Resurface 0.5 mile

5/1/2009

11/1/2009

$

120,000

Watervliet

Dan Smith Road

Hennesey to M-140-Resurface 1.0 mile

5/1/2009

11/1/2009

$

130,000

m b u

Various Various Various Various

02262009

S

O N

R d

e t t

it

st

e u

eq

s

A T

Submitted Requests - Not Approved

PP

O R 11/1/2009

D VE

Route (Infrastructure Only)

29 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Berrien County Road Commission Bessemer Area School District BEST Academy BEST Academy BEST Academy BEST Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy Bingham Arts Academy

Bingham Tonwnship

Location City or Township

Project Name

Birch Run Township

Start Date

Funding Request

Watervliet

Dwight Boyer

N. Watervliet to County Line-Resurface 1.3 miles

5/1/2009

11/1/2009

$

200,000

Watervliet

Fairview Subdivision

Watervliet Township-Resurface 1.5 miles

5/1/2009

11/1/2009

$

250,000

Weesaw

Wagner Road

Holden to Cleveland-Resurface 1.0 miles

5/1/2009

11/1/2009

$

125,000

Weesaw

Pardee Road

Kruger to Glendora-Resurface 4.4 miles

5/1/2009

11/1/2009

$

700,000

Weesaw

Cleveland Avenue Bessemer Area Schools Washington Elementary/AD Johnston

Wagner to Elm Valley-Resurface 2.5 miles

5/1/2009

$

800,000

5/1/2009 6/1/2009 6/1/2009

$ $ $

325,000 600,000 1,000,000

3/1/2009 5/1/2009

9/1/2009 9/1/2009

$ $

98,000 250,000

Alpena

Hot water heaters for (3) classroom restrooms

P P A

8/1/2009 10/1/2009 1/1/2010

Highland Park Highland Park

Window replacement. 4th floor renovations (5 classrooms) multi-purpose room repair boiler system, electrical system, plumbing system, elevator and parking lot paving roof repair and replacement

6/1/2009

9/1/2009

$

3,000

Alpena

Steel interior doors for security

6/1/2009

9/1/2009

$

18,000

Alpena

Thermal windows throughout building

6/1/2009

9/1/2009

$

130,000

Alpena

Modernize boiler system peripherals

3/1/2009

7/1/2009

$

100,000

Alpena

Staff restroom

6/1/2009

9/1/2009

$

8,000

Alpena

Repair basement foundation leaks

6/1/2009

9/1/2009

$

20,000

Repair retaining wall

6/1/2009

9/1/2009

$

30,000

Enlarge and fence playground

6/1/2009

9/1/2009

$

50,000

Camera and door security/access systems

6/1/2009

9/1/2009

$

65,000

7/1/2009

Nov., 2009

$

1,900,000

Bessemer Highland Park Highland Park

Alpena Alpena Alpena Bingham Township, Clinton County

d e tt

Birch Run Township

u S

Birch Run Township

02262009

s t s

T O

-N

q e R

e u

Intergovernmental Sewer Agreement between Replacement of township lagoon system with a hook-up to the City of St. Johns City of St. Johns & Bingham Townhsip sanitary sewer system.

it

Birch Run Township

Project Description

Expected Completion Date

bm

Water Storage/Pumping

Construct potable water storage for Birch Run Township to comply with MDEQ's recommendations.

Dixie Hwy Water Transmission Main

Construct approximately 4 miles of 12”-16” water transmission main to provide additional water supply to the Township. This water main will provide a second supply for reliability and additional fire flows to existing commercial and light industrial development and will supplement an existing water main that supplies both the Village of Birch Run and Birch Run Township. This water main will also provide an additional supply to much of the water distribution system that has no secondary supply if the existing primary water supply were to fail. This water main would also allow the Township to meet MDEQ and City of Saginaw requirements for the Township water system. 6/1/2009

Submitted Requests - Not Approved

6/1/2009

O R 11/1/2009

9/1/2009

9/1/2009

D VE

Route (Infrastructure Only)

$

Elevated water storage tank or ground storage tank with booster 800,000 pumping station

$

Dixie Hwy Pumping Station near Townline Road to Birch Run 3,800,000 Road

30 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Birmingham Bloomfield Art Center Birmingham

OR

Birmingham Bloomfield Art Center Birmingham

Parking lot replacement

Remove and replace approximately 56,000 sq ft of bituminous asphalt parking lot with standard DOT asphalt. June, 2009

June, 2009

Birmingham Bloomfield Art Center Birmingham

Roof replacement

Remove and replace existing aging roofs, including adding insulation to exceed code requirements with LEED certified insulation April, 2009

July, 2009

HVAC replacements

Replace 3 rooftop plus 3 interior HVAC units with energy efficient units.

Feb., 2009

Terminal Expansion

Terminal Expansion

6/1/2009

Blair Memorial Library Imagine the Future

Birmingham Bloomfield Art Center Birmingham Bishop International Airport Authority Flint

An alternative to the above: replace with green, environmentally-friendly permeable asphalt.

Green Parking lot

July, 2009

Harbor Springs

e t tt

i m

Blue Lake Fine Arts Camp

b u S

Twin Lake, Michigan

02262009

Blue Lake Construction

D VE $

212,500

June, 2009

$

75,000

6/1/2011

$

37,000,000

Blair Memorial library is celebrating 80 years of operations in a building that is over 46 years old. The proposed project was designed by Anderson, Eckstein and Westnick, Inc., which includes exterior building improvements, window replacements, entrance improvements, floor carpeting improvements, alarm system additions, electrical up grades, restroom improvements, Work/Staff area improvements. The project further will add an additional 60 per cent to the reconstructed building and further added amenities such as computer work stations, entrance enhancements, expanded collections area, a children's library, circulation desk, a community room and exterior links to landscape areas outdoors. Project Cost is 1.6 million The Blar Memorial Library Services over 12,000 residents and circulates over 100,000 transactions in the last year. Blair Memorial Library has high traffic and usage especially for the children's programming and other adult services and programs. The Library is located in a central downtown location of a very action urban City that is undergoing huge re-vitalization. 6/9/2009

Fall 2009

$

1,600,000

Development of a retreat center for arts and cultural enrichment activities that includes cabins, a campground, guest house and solar pavilion on property that is owned by the Blissfest Music Organization and used only one weekend a year for the Annual BLissfest Festival. This proposal will expand the use of the property for year round activities Spring 2009

2011

$

1,000,000

As Blue Lake Fine Arts Camp prepares for its 44th Season, construction of new camper housing and replacement of two outdoor rehearsal facilities destroyed by record snowfalls will be critical to our operation. We are respectfully submitting this “shovel ready” project for consideration by the pending American Recovery and Reinvestment Plan (ARRP). Two of Blue Lake’s outdoor rehearsal facilities were destroyed due to excessive snow weight-load in December of 2008. These 40’ X 80’ structures serve as primary rehearsal facilities for several of Blue Lake’s student symphonic bands during the primary summer season. Designed in keeping with Blue Lake’s natural setting within Manistee National Forest, the rehearsal facilities are open on all four sides and include percussion storage. An energy efficient lighting system with timers is included in the reconstruction costs. In response to the demands of growing enrollment and student waiting lists, we are prepared to begin construction on a new boys housing unit in April of 2009. The unit will include 4 cabins, housing 11 students and one counselor each; 1 unit director cabin; and 1 unit bathroom with toile 4/1/2009

6/1/2009

$

140,900

t s e

PP

O R

O N

u q e

R d

Blissfest Arts Recreation Center

839,820

182,000

s

Blissfest Music Organization

$

$

A T

Blair Memorial Library City of Clawson

July, 2009

Funding Request

Route (Infrastructure Only)

Submitted Requests - Not Approved

31 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Blue Lake Fine Arts Camp Blumfield Township Blumfield Township Blumfield Township Blumfield Township Blumfield Township Blumfield Township

Borgess Medical Center

Twin Lake, Michigan Blumfield Twp/Road Commission Blumfield Twp/Road Commission Blumfield Twp/Road Commission Blumfield Twp/Road Commission Blumfield Twp/Road Commission Blumfield Twp/Road Commission

Kalamazoo, MI

Project Name

Project Description

Start Date

Expected Completion Date

Blue Lake Construction

As Blue Lake Fine Arts Camp prepares for its 44th Season, renovation of two outdoor rehearsal facilities, the Student Arts Center, and the Miller Theater will be critical to our operation. We are respectfully submitting these “shovel ready” projects for consideration by the pending American Recovery and Reinvestment Plan (ARRP). Two of Blue Lake’s outdoor rehearsal facilities were significantly damaged due to excessive snow weight-load in December of 2008. These 40’ X 80’ structures serve as rehearsal facilities for several of Blue Lake’s student symphonic bands during the primary summer season. Designed in keeping with Blue Lake’s natural setting within Manistee National Forest, the rehearsal facilities are open on all four sides and include percussion storage. The renovated rehearsal facilities will include installation of a grid tie solar electric system and an energy efficient lighting system with timers. Blue Lake’s Student Arts Center, constructed in 1999, is a 73,000 sq. ft. facility which houses the Blue Lake Dining Hall, Blodget Recital Hall and numerous rehearsal spaces. This 3 story facility was originally designed with 8 traditional rooftop HVAC Air4/1/2009

Wadsworth Bridge Rebuild

P P A

O R

D VE $

504,220

Rebuild Bridge, Wadsworth over Uncle Henry Drain. -Also gave to Road Commission

$

500,000

Muller Rd Rebuild

Rebuild Mueller Rd - M-46 to Janes Rd - Also gave to Road Commission

$

300,000

Becker Rd Rebuild

Rebuild Becker Rd. - Knight Rd to Reimer Rd. Also gave to Road Commission

Spring 2009

$

320,000

Muller Rd Rebuild

Rebuild Mueller Rd - M-46 to Janes Rd - Also gave to Road Commission

Spring 2009

$

300,000

Becker Rd Rebuild

Rebuild Becker Rd. - Knight Rd to Reimer Rd. Also gave to Road Commission

$

320,000

Wadsworth Bridge Rebuild

Rebuild Bridge, Wadsworth over Uncle Henry Drain. -Also gave to Road Commission Summer 2009

$

500,000

$

3,500,000

t i m

d e tt

Computerized Physician Order Entry

T O

s t s

-N

6/1/2009

Funding Request

e u

Computerized physician order entry (CPOE), is a process of electronic entry of physician instructions for the treatment of patients. These orders are communicated over a computer network to the medical staff (nurses, therapists, pharmacists, or other physicians) or to the departments (pharmacy, laboratory or radiology) responsible for fulfilling the order. CPOE decreases delay in order completion, reduces errors related to handwriting or transcription, allows order entry at point-ofcare, provides error-checking for duplicate or incorrect doses or tests, and simplifies inventory and posting of charges. Implementation of CPOE at Borgess Medical Center would create or perserve over 30 jobs. Borgess has completed the necessary design work required to implement this system and awaits funding to implement this very important service. Eliminating paper and verbal orders would not only improve patient saftey, it would lower costs associated with current manual procedures. These savings could be used to help sustain the CPOE systems going forward. 6/1/2009

q e R

9/1/2010

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

32 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Borgess Medical Center

Kalamazoo, MI

Project Name

Project Description

Start Date

Conversion of IV Pumps to Smart Pumps

Replace our current IV Pumps with Smart Pumps, an infusion pump also capable of accessing patient specific drug dosage information from a Pharmacy database which would prevent/eliminate medication errors delivered to patients. Specifically, the system allows bar code scanning of three items: • patient’s identification bracelet • physician’s order for the drug to be administered • the bar code on the drug itself The system then matches all three pieces of information to ensure the right drug is delivered to the right patient in the right dose. If all components don’t match, the IV pump will not administer the drug to the patient. Our existing IV pumps, which are not Smart Pumps, are comprised of a discontinued model and cannot be replaced. If we are unable to replace our existing pumps with Smart Pumps, this will impact our ability to admit and care for patients, which in turn, would result in work force reductions across all spectrums of job classes. 4/1/2009

Philips Telemetry Monitoring System s

Philips Medical Telemetry System is a wireless patient monitoring of heart rate, rhythm, and the level of oxygen in the bloodstream. This wireless, IT capability constantly tracks this medical data while allowing the patient to move about freely in their hospital bed, or even get up and move about in their room, without getting tangled up in wires and lines. The computer system that drives this telemetry system for our cardiovascular and telemetry units is obsolete at Borgess, with Philips no longer able to support the technology because it is so old. If the system goes down, it is highly unlikely a repair could be achieved, and we would lose the ability to monitor patients in 80 beds, thus effectively closing those beds. This would result in ambulance diversions and the inability to admit patients to Borgess. A reduction of 80 of our 400 beds is possible plus the loss of patients associated with ambulance diversions, would cause significant work force reductions across the entire spectrum of employees, potentially involving hundreds of nurses, respiratory therapists, pharmacists, physical therapists, radiology technicians, food service employees, hous 8/1/2009

A T

Borgess Medical Center

Kalamazoo, MI

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2010

$

2,500,000

2/2/2010

$

6,000,000

8/1/2010

$

22,938,000

O N

u q e

Borgess Medical Center began the implementation of an electronic medical record. Many components of the electronic medical record are now in place, but due to difficult economic conditions the progress toward a complete EMR across the entire health system has been put on hold over the few months. A capital investment is required to move forward. To complete the implementation of the EMR across the health system, new systems like an Emergency Department system, Physcian Documentation, OB system, and ambulatory EMR would need to be purchased and implemented. Completing the EMR at Borgess will create or preserve over 30 jobs. This project is "shovel ready," design is near complete. A completely implemented EMR not only will significantly improve patient saftey, it will eliminate the time consuming paper records and lower patient care costs for the health system. The lower aministrative costs will more than offset the cost of maintaining these healthcare information systems going forward. 10/1/2008

R d

Borgess Medical Center

02262009

i m

b u S

Kalamazoo, MI

e t tt

Electronic Medical Record (EMR)

Submitted Requests - Not Approved

33 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Boyne City Public Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brevort Township

Brevort Township

Project Name

Boyne City

Energy Retro Fit

Niles Township

Merritt Elementary

Niles Township

Bell Education Center

Niles Township

Bell Education Center

Heating plant replacement

Niles Township

District wide

Niles Township

Brandywine Elementary

Niles Township Brevort Township, Mackinaw County

Bell Education Center

9/1/2010

$

30,000

8/1/2009

$

200,000

6/1/2009

8/1/2009

$

250,000

Network connectivity upgrades between buildings;upgrade to fiber optics

7/1/2009

9/1/2009

$

100,000

Bus Loop parking lot lights in around front of building Parking lot repaving; original to building from mid 60's in one section; mid 80's in second section

6/1/2009

8/1/2009

$

30,000

6/1/2009

8/1/2009

$

50,000

Feb. 2009

Dec. 2009

$

680,000 NA

Feb. 2009

Dec. 2009

$

64,000 NA

t i m

Frank N. Andersen Recreational Complex

This regional facility will draw participants from the Great Lakes Bay Region and provide a safe synthetic playing surface that accommodates wheelchairs and other assistive devices, while helping to prevent injuries by removing barriers that arise from the natural grass fields. This project also includes two separate accessible parking areas, a specially designed restroom facility, changing rooms, a universally accessible spray park and almost a mile of accessible paths throughout the park including a perimeter path and walkways to link the features of the complex together and to the other amenities within the park. This facility will be only the second of its type in the state with the other facility located in Southfield, MI. The topo survey is competed and the design engineering is scheduled to start within the next few weeks. Preliminary estimate of cost of Phase 1 is $1,530,000.00. This project would provide jobs for thirty people and could be started within 180 days. 5/1/2009

2/1/2010

$

1,530,000

Drainage on Miriam Drive

Drainage Improvements on Miriam Drive and Fort Road. The drainage project has been designed and engineered but could not be started due to lack of funds. The poor drainage on Miriam results in several crawl spaces being consistently flooded. Preliminary estimate of cost is $53,000.00. This project would provide jobs for five people and could be started within 90 days. 4/1/2009

5/1/2009

$

53,000

Brevort Township Sewer Up-grades

ub

Bridgeport Twp.

Bridgeport Twp.

02262009

D VE 720,507

A T

e u

st

s

O N

Brevort Township Community Center/ Firehall Construct a combination Community Center/ Firehall on township property.

Brevort Township, Mackinaw County

PP

O R

Funding Request

Route (Infrastructure Only)

$

S Bridgeport Township

Start Date

The project is to employ various Energy Conservation Measures (ECM) throughout five buildings in the Boyne City Public School district to reduce electrical, gas, and water consumption. An initial feasibility and investment grade audit has been completed by an Energy Service Company (ESCO) indicating a current Energy Star rating of 58 (unsubstantiated by the EPA) with an anticipated rating improvement of approximately 20 points as a result of the ECMs. Specifically, all lighting components (bulbs, fixtures, ballasts) will be upgraded and natural light and motion sensors addedsubstantially improving the buildings’ green standards. Newer energy efficient (modulating) boilers will be added to the heating systems. Sinks, urinals, and water closets will be replaced throughout the district to reduce the amount of domestic water consumption and waste water. Four of our five buildings are over 30 years old and although structurally sound, it is anticipated that the proposed ECMs will minimally save the district $60,000 annually at current gas and electric rates. Multi-purpose room remodel; ceilings, tile floor (original gym and lunchroom for mid 60's 6/1/2010 Energy efficient windows; ceiling tiles throughout building; original to building from mid 60's 6/1/2009

d e tt

Bridgeport Township

Project Description

Expected Completion Date

Install Presure guages on existing forcemain at various locations. Remove and replace approximately 38 air release valves. Place flow meter at outlet. Work mandated by MDEQ

q e R

Submitted Requests - Not Approved

34 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bridgeport Township

Bridgeport Township

Bridgeport Township

Bridgeport Township

Bridgeport Township

Bridgeport Township

Bridgeport Township

Bridgeport Twp.

Project Name

Project Description

Start Date

Expected Completion Date

Municipal Parking Lot on Williamson

This project has been designed and engineered but has not been started due to lack of funds. The design incorporates low impact runoff features encouraged by Phase II Storm Water guidelines. Parking for businesses in this area of the Township is minimal and this 16 space parking lot would reduce the need for curbside parking and reduce the associated inherent hazards therein. Preliminary estimate of cost is $110,000.00. This project would provide jobs for five people and could be started within 90 days 4/1/2009

Zelle Water Main

Replace 2000’ of Water Main on Zelle Dr. The existing 4” and 6” water main is undersized and provides poor fire flows as demonstrated in reliability studies. The new main will be 12” water main and will significantly improve system reliability and fire flow. The topo survey and design engineering are complete. Preliminary estimate of cost is $230,000.00. This project would provide jobs for ten people and could be started within 90 days. 4/1/2009

D VE $

110,000

7/1/2009

$

230,000

Bearcat Water Main

Replace 4500’ of Water Main on Bearcat. The existing 4” and 6” water main is undersized and provides poor fire flows as demonstrated in reliability studies. The school system has the high school, two elementary schools, the bus garage, the football stadium and central supply located on Bearcat. The new main will be 8” water main and will significantly improve system reliability and fire flow. The topo survey and design engineering are complete. Preliminary estimate of cost is $360,000.00. This project would provide jobs for ten people and could be started within 90 days. 4/1/2009

7/1/2009

$

360,000

Townline Road & Drainage -Bell to Pettit

Road and Drainage Improvements on Townline Road – Bell to Pettit. This one mile project has been designed and engineered and some work has been done but had to be stopped due to lack of funds. The drainage is very poor and consequently the roadway is badly deteriorated. The project would consist of storm drainage on both sides of the road and crushing, milling, shaping, paving and shouldering the road. Preliminary estimate of cost is $450,000.00. This project would provide jobs for fifteen people and could be started within 120 days. 4/1/2009

8/1/2009

$

450,000

Bridgeport Twp.

Baker Road & Drainage

Road and Drainage Improvements on Baker Road – Portsmouth to Reimer. This one mile project has been designed and engineered but could not be done due to lack of funds. The drainage is poor and consequently the roadway is badly deteriorated. The project would consist of storm drainage on both sides of the road and crushing, milling, shaping, paving and shouldering the road. Preliminary estimate of cost is $600,000.00. This project would provide jobs for fifteen people and could be started within 120 days. 4/1/2009

8/1/2009

$

600,000

Bridgeport Twp.

Road and Drainage Improvements on Townline Road – Blackmar to I-75. This one mile project has been designed and engineered but has not been started due to lack of funds. The drainage is very poor and consequently the roadway is badly deteriorated. The project would consist of storm drainage on both sides of the road and crushing, milling, shaping, paving and shouldering the road. Preliminary estimate of cost is $600,000.00. This project would provide jobs for fifteen people and could be Townline Road & Drainage - Blackmar to I-75 started within 120 days. 5/1/2009

9/1/2009

$

600,000

Replace the Bridge on Fort Road over the Cass River. This project has been designed and engineered in conjunction with the Saginaw County Road Commission, Michigan Department of Transportation and the Federal Highway Administration but has not been started due to lack of funding. The badly deteriorated bridge is the only connection over the Cass River that connects the easterly side of the township with the westerly side. Preliminary estimate of cost is $2,200,000.00. This project would provide jobs for thirty people and could be started within 180 days. 5/1/2009

2/1/2010

$

2,000,000

Bridgeport Twp.

Bridgeport Twp.

Bridgeport Twp.

Bridgeport Twp.

02262009

N s

t s e

u q e

R d

e t tt

Replace Bridge-Fort Road over Cass River

Submitted Requests - Not Approved

O R

P P A

i m

ub

S

T O

5/1/2009

Funding Request

Route (Infrastructure Only)

35 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bridgeton Township

Bridgeton Township

Bridgeton Township

Bridgeton Township

Grant

Grant

Bridgewater Township, Bridgewater Township Washtenaw County

Project Name

Community Technology Implementation

Bridgeton Community Boat Launch

Township Boat Launch renovation and expansion for improved access to the Muskegon River project is based on the portion of the Muskegon River's most heavily fished and State Fisheries maintained region. Over the past several years, as employment has become more urban-centered and local and regional industry has closed down, the recreational interests have become the most viable economic boon to the rural community in general and to Bridgeton Township in particular. 4/1/2009

Bridgeton Community Park

Bridgeton Community Park Development project will provide for public recreational usage and access to the Muskegon RIver and the enjoyment of natural features including ADA nature trails, river-overlook and picnic & playground areas. Focus is on environmental-friendly sustainable & "greening" features that incorporate recycled materials-usage, open space preservation, solar-powered structures, natural raingardens/retention sites and non-toxic/natural composting restroom facilities. 4/1/2009

Wireless Bridgewater

t i m

Bridgewater Hamlet Drain

O R

Funding Request

$

205,000

10/1/2009

$

150,000

10/1/2009

$

175,000

Establish up to 3 "nodes" for wireless internet service that would interface with existing "nodes" in adjacent townships to further develop wireless connections in our rural area. The project would involve attaching transmission boxes ("nodes") onto three existing structures in the township: one onto township hall, a second onto a barn and a third onto a silo. This would allow the township to follow through with this project to provide quality wireless service to our residents and businesses. 5/1/2009

Aug. 1, 2009

$

Repair and replace significant portions of this "turn-of-the-century" drain tile (19081910). This project desperately needs to go through as the drain's tile's disrepair has been causing flooding and blow holes in the land and cracks and erosion through a main road for several years. These conditions are dangerous to the health and safety of our residents and a liability to our businesses. Funding this project will relieve future impending tax burden on the residences and businesses in our rural area. This project will involve reviewing existing engineering plans to identify the areas of the drain tile that need to be replaced and those that need repair. As the township already paid Washtenaw County to evaluate the design requirements for this project, this phase should proceed expeditously. The construction phase of the project will involve digging up segments of the old drain tile and repairiong and replacing them with new materials. 4/1/2009

10/1/2009

$

T O

q e R

P P A

N s

st

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

10/1/2009

e u

b u S

02262009

Start Date

Community Technology Implementation Plan provides immediate broadband/satellite access for the municipal government offices. For the community, a public computer lab and a wireless-café setting provide internet services as well. In all, the project creates efficiency for governmental functionality, e-commerce opportunities for citizens, as well as economic improvement/impact for home based & local /retail businesses. Further, it provides access to online-education opportunities, re-training services for senior citizens and displaced workers, opportunities for upgrading technology skills with accredited and continuing education courses, and access to online job-bank. Each of which, provide the tools necessary to maintain a viable workforce and to expand employment opportunities while reducing the carbon-foot print of travel. 3/1/2009

d e tt

Bridgewater Township, Bridgewater Township Washtenaw County

Project Description

Expected Completion Date

82,000 NA

990,000

36 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Briggs Public Library

Saint Johns/ Bingham Township

Project Name

Project Description

Start Date

Briggs Public Library

Heating and Cooling

Exterior Facility Improvments

Our building was built in 1987 and originally used as a carpet store. We lose a great deal of energy to the outside and as the building has settled there are gaps around ou exterior doors where air leeks. The siding and doors are original and the siding is of low grade quality, has holes in it and is brittle. Our plan is to put 3/8" fan fold insulation board on the exterior of the building and then install 6" Polar Wall insulated vinyl siding. By replacing the four exterior doors with steel insulated doors our goal is to eliminate the gaps especially at the threshold thus reducing or eliminating the exchange of air with the outside. The one set of windows we are replacing are at the circulation desk. Currently those widows do not open even though there seems to be energy lose around them. It was a staff wish and the Board agreed that we could get double hung (low-E argon) windows that open. It may sound a little silly in the age of Bids to be air conditioning but in the spring and fall we often turn the furnaces/air conditioners off reviewed and job and open the windows to cool the building. We are hoping all these measures will hel awarded 04/09/09

Until a contractor is awarded the job there is no set completion date. It is the Library's expectation that the work will be done during the spring and summer of 2009. $

July

$

1,000,000

9/1/2009

$

623,000

12 months

$

1,872,210

12/1/2009

$

11,000,000

3/1/2010

$

675,000

7/15/2009

$

880,000 NA

Oct, 2009

$

120,000

O R

P P A

N s

t s e

Brighton Township

Charter Township of Brighton

East Grand River water main extension project

The water main extension would serve many businesses and residents who currently are relying on individual wells. The lack of adequate infrastructure is prohibitive to economic development at a time when Brighton Township, Michigan, and the United States, need jobs the most. April

Brighton Township

Brighton Township, Livingston County

Grand River - Hilton Water Main Extension, Phase II

Approximately 3200 feet of 12-inch water main extension to encourage development and growth in the area. North along the east side of Grand River Road from Conference Center Drive to existing water main just north of hacker Road. 4/1/2009

Buchanan Community Schools Buchanan Charter Township of Buena Vista Township Buena Vista Charter Township of Buena Vista Township Buena Vista

u q e

R d

e t tt

Guaranteed Energy Savings

i m

Sanitary Rehabilitation Project

b u S

Electronic Water Meter Upgrade

Butman Township

Butman Township, Gladwin County

Infiltration & Inflow Restoration Project

Byron Area Schools

Byron/Burns

Energy Savings

02262009

Funding Request

Route (Infrastructure Only)

Until a contractor is awarded the job there is no set completion date. It is the Library's expectation that The Library is planning to replace three furnaces and three air conditioners. These the work will be units are original to the 1987 construction of the building. Within the last several years these units have needed to be repaired a number of times. Our hope is that replacing Bids to be done during the units that are twenty years old with new ones it will not only lessen our maintenance reviewed and job spring and costs but that the units will be more energy efficient as well. awarded 04/09/09 summer of 2009. $

T O

Saint Johns/ Bingham Township

Expected Completion Date

The proposed facility infrastructure imporvements will reduce our energy consumption from $0.99 per square foot to $0.80 per square foot. This is a potential savings of $50,053.00 per year if we focus on our three least efficient buildings. EMCOR will selfperform the total project which keeps costs low by avoiding double mark up. A complete description of the proposed improvements is attached. See pages 1-7 90 Days I/I removal project responding to the Judicial Consent Order entered in to with the State of Michigan 6/1/2009

Installation of radio reading equipment on Township wide water meter system.

6/1/2009

20,000 linel feet of sewer main located within the Sugar Springs Developmnet. To eliminate the inflitration of ground water into the waste water collection system. The system consists of 396,000 linel feet of sewer main; of which, approx. 20,000 feet have been identified as being in immediate need of restoration. The most cost efficien method of restoration is accomplished by inserting a permmanenet lining into the affected areas; rather than replacing the pipe itself. 4/15/2009 To conserve energy and money we want to install new insulation, thermostats and enery conserving windows in our existing buildings. Jun, 2009

Submitted Requests - Not Approved

D VE

18,189

41,000

37 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Byron Area Schools

Byron Area Schools Byron Area Schools

Byron/Burns

Byron/Burns Byron/Burns

Project Name

Project Description

Start Date

Expected Completion Date

Lighting Upgrades

To conserve energy and money we want to complete the project we have begun to replace all of the lighting in our buildings with more efficient lighting and install a control and monitor system

May, 2009

Sept, 2009

Building Upgrades Bus Fleet

Our buildings are very dated and lack many of the modern features of newer buildings We would like to renovate our existing buildings, add classrooms, add a common library for our secondary students, expand our elementary cafeteria and build a common cafeteria for our secondary students May, 2009 We need to update our bus fleet. The average fleet age is over 10 years May, 2009

Sept, 2010 Sept, 2009

$

D VE

8,000,000 800,000

Sept, 2009

$

180,000

October '09

$

5,000,000

October '10 2010 2010

$

3,500,000

O R

Byron Area Schools

Byron/Burns

Tecnology Upgrades

Byron Township

Byron Township, Kent County, MI

Sanitary Sewer System Replacement

Construction of Approximately four miles of sanitary sewer, a pump station, and 1-1/2 miles of forcemain to replace an existing sewer which has reached capacity July '09

Byron Township Byron Township Byron Township

Byron Township, Kent County, MI Byron Twp Byron Twp

Redundant Water Supply Development Pump Station and 3 Miles Force Main Pump Station 1,000 ft pipe

Construction of a pump station and three miles of watermain to provide a redundant water supply connection for a water system serving 6000 people Pump Station and 3 Miles Force Main Pump Station 1,000 ft pipe

Juvenile Home Facility Improvements

The Calhoun County Juvenile home was built over 50 years ago. Juvenile detention in today's society requires the type of structure that facilitates administrative segregation to keep youth committing lesser crimes separated from the predatory behavior of the more troubled juveniles. Also, the juvenile home has operated strictly as a detention facility due to building issues that severely limit the development of programs for youth behavior that requires special attention. As the juvenile home ages and the building condition deteriorates, passing the State Child Licensing requirements becomes more difficult and expensive each year. The Juvelile home could be improved by implementing facility improvement plan which has been developed but not executed 180 days after due to funding restraints. funding approval Within 1 year

T O

N s

January '09 2009 2009

150,000

$ $

The technology available to our students and staffs is out of date. We will install new teaching stations, work stations, LCD projectors, smartboards, new servers, and new cabling to provide ready access to technolgy as a teaching and learning tool. May, 2009

P P A

Funding Request

Route (Infrastructure Only)

Yes Yes

t s e

Calhoun County

Marshall

u q e

$

700,000

$

3,000,000

R d

Calhoun County

Battle Creek

ub

i m

e t tt

Justice Complex Roof Replacement

In 1993 , an Ethylene Propylene Diene Terpolyner (EPDM) single-ply rubber roofing membrane was installed at the Calhoun County Justice Center Complex in Battle Creek, MI. In 2008, the County contracted with a rubber membrane roofing consultan to provide a thermographic analysis and visual assessment of the roof system to determine the condition and life expectancy of the roof. As a result of the analysis it was determined that the 165,000 Sq Ft roof is in poor condition with a life expectancy of 1-2 years. The Justice Center has experienced failures in a number of roof sections resulting in water damage to the interior surfaces. Temporary repairs to comprised roof secitons are no longer an option. A detailed construcion plan and replacement schedule was included in the consultants report. 5/1/2009

Within 1 year

S 02262009

Submitted Requests - Not Approved

38 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Calhoun County

Calhoun County

Project Name

Project Description

Start Date

County Facilities Energy Efficiency Program

Over the past several years the County has implemented an Energy Management Strategic Plan reducing overall energy costs by over $1 million dollars while reducing the environmental footprint of its six county buildings. Energy reduction projects have been identified as principal developments in the effort to reduce facility costs related to utilities. This capital improvement program reduces the County's operating costs and environmental impact by replacing inefficient and outdated building system equipment The County has worked with Johnson Controls to successfully design and execute a number of energy reduction strategies. The County is in a precarious position where we can not fund the capital requirements for additional energy conservation measures due to the significant increase in utility costs which have placed a drain on funds available for capital projects. The County has a number of energy conservation projects in the planning pipeline but the capital funding requirements are not available 120 Days after from county general fund resources at this time. funding approval Within 2 years

Calhoun County Law Enforcement Center

In 1993, the Office of the Sheriff’s Law Enforcement and Corrections Divisions moved into the Justice Center Complex in Battle Creek, MI. Due to office space constraints in the Justice Center and the desire by the Sheriff to move Law Enforcement back to a more central location in the County, the Sheriff Road Patrol temporarily occupied the first floor of the previously abandoned jail in Marshall in 1996. The jail had been vacated in 1993 due to jail overcrowding and the deteriorating condition of the 50 year old structure. The Road Patrol has occupied the first floor of the old jail for more than 12 years while waiting for the development of plans for a multi-jurisdiction public safety facility for Michigan State Police, City of Marshall Police and the Sheriff Law Enforcement Division. Due to an inability to sustain the plan for a joint public safety campus, in addition to a State of Michigan Attorney General legal opinion which requires the Sheriff to maintain a principle office in the county seat (Marshall, MI), the 120 Days after County contracted with an architectural firm to evaluate space needs for the Sheriff’s pfunding approval Within 2 years

O R

Marshall

Funding Request

PP

1,000,000

$

1,900,000

Marshall Township contains a large site known as "G and G property" that has had considerable interest with growing industry. Within the past year the property has been considered by Volkswagon and United Solar Ovonic. Both companies chose alternate sites largely due to the lack of public utilities available. Preliminary design basis report has been prepared and a consultant engineer has been selected. The project includes an extension of the City of Marshall's wastewater collection system, water distribution system and electric distribution system to service the property. Also included in the project improvements are an elevated water storage tank, water 120 Days after treatment facility, property acquisition and electrical substation. funding approval Within 2 years

$

23,200,000

The three Public Service Access Points (PSAP's) providing 911 dispatch in Calhoun County are currently operated in the cities of Marshall, Albion and Battle Creek. In 2008 representatives from these three cities, other municipalities, and County Government collaborated on a plan to consolidate the three PSAP's to one centralized 911 dispatch center. A 911 Authority Board was established and it was determined that a consolidated plan would eliminate the significant costs associated with redundant technology upgrades and reduce reoccurring expenses through the synergy and operational efficiencies. The 911 Board has authorized the County to remodel office space within the County Building and purchase equipment to enhance facility security and provide an environment conducive to executing the responsibilities associated with responding to emergencies. The County has utilized the services of an architectural firm to develop construction plans and estimate the costs for improvements to the 3,000 Sq Ft of space in the County Building in Marshall. 4/1/2009

$

750,000

s

t s e

Route (Infrastructure Only)

D VE $

A T

Calhoun County

Expected Completion Date

O N

u q e

Calhoun County

Marshall

R d

e t t

C Drive Infrastructure Extension, Marshall

t i m

b u S Calhoun County

Marshall

02262009

E 911 Consolidated Dispatch Center

Submitted Requests - Not Approved

11/1/2009

39 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Calumet-Laurium & Keweenaw Public Schools Calumet-Laurium & Keweenaw Public Schools

Calument, Michigan

Calumet and Mohawk

Project Name

Project Description

Start Date

Expected Completion Date

AC, Energy Replacement and Ventilation Improvements

Install air conditioning and energy replacement systems and make improvements to current ventilation system.

4/1/2009

8/1/2009

Lighting Replacment

Replace antiquated lighting system in all district buildings to a more modern and energy efficient system. A new lighting system will improve visual acuity, decrease maintenance and energy costs dramatically.

2/1/2009

8/1/2009

4/1/2009 5/1/2009

Funding Request

$

Route (Infrastructure Only)

2,500,000

D VE $

295,000

$

500,000

10/1/2009

$

360,000

Calumet-Laurium & Keweenaw Public Schools

Mohawk, Michigan

Mohawk heating Plant

The proposed plant would burn wood chips and wood by products of the Keweenaw Peninsula wood products industry, for example, tree tops, sawdust, and bark. This heating system would reduce operational costs and increase energy efficiency.

Canton Township

Canton Township

CDBG Program - Housing Rehabilitation

Housing rehabilitation projects for low income families within Canton Township.

Stormwater Detention Basin Retrofits and Enhancements

The project involves the retro-fit and enhancement of existing storm water detention basins around the community. These ponds will be upgraded to current storm water standards and enhanced with native vegetation. 5/30/2009

10/1/2009

$

500,000

12/1/2009

$

650,000 Hanford Road

Canton Township

Canton Township

P P A

O R 11/1/2009

Canton Township

Canton Township

Watermain Replacement

The water master plan requires a 12" diameter watermain to balance system pressures and provide future service in the district. Done via trenchless technology to protect trees. 8/1/2009

Canton Township

Canton Township

Pedestrian Pathway & Bridges

The project includes the construction of pedestrian bridges and trails over the Rouge River providing interconnection of community pathway system segments. 5/15/2009

8/15/2009

$

700,000

Regional Stormwater Quality Basin

This basin will serve several future commercial developments planned for the area. It has been designed to function as a cold water basin to support sport fish populations in an existing area of concern (AOC) identified by the MDEQ/EPA. The basin meets the latest native planting & green infrastructure ordinance requirements of the community. 6/30/2009

9/30/2009

$

745,000

Watermain Replacement Canton Softball & Sports Complex Improvements

The existing 8" diameter watermains have a high frequency of breaks causing significant water service disruption to customers. Replacement will be done via trenchless technology. 5/1/2009 The project includes the replacement of the existing softball field lighting network with energy efficient lighting panels. 6/1/2009

8/1/2009

$

Aberdeen, Oakview, Brookline 995,000 and Arlington

8/1/2009

$

1,000,000

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

Canton Township

st

e u

eq

N s

R d

Various energy efficiency improvements (i.e. lighting, water conservation, heating & cooling) to existing community facilities based on the 2007 State of Michigan DLEG Energy Audit to reduce energy demands.

4/1/2009

12/31/2009

$

Community facilities located throughout Canton 1,230,000 Township

The project includes the paving of an existing gravel road from Ford Rd. north to Warren Rd. with a three (3) lane asphalt cross section. The project also includes a bridge replacement over the County drain. Includes LID design features.

6/1/2009

10/1/2009

$

1,500,000 Ford to Warren

Sauk Trail Hill Landfill Gas Recovery Project

The existing solid waste landfill produces over 3,500 standard cubic feet per minute of landfill gas that is flared off to the atmosphere. The project involves the construction of a landfill gas-to-energy facility in partnership with the landfill operator. The electricity produced from this renewable energy project will save local businesses cost and reduce reliance on non-renewable energy. 9/1/2009

9/1/2010

$

Sauk Trail Hill 7,500,000 Landfill

6/1/2010

$

8,000,000

12/31/2009

$

101,571

e t tt

Building Energy Efficiency Retrofits

i m

Ridge Road Paving

b u S

Canton Township

T O

Canton Township

Canton Township

Phase 3 - Sanitary Sewer Relief Projects

The sewer master plan requires 24" and 36" diameter relief sanitary sewers to comply with an existing Administrative Compliance Agreement with the MDEQ. Project also includes pedestrian trails. 5/1/2009

Canton Township

Canton Township

Human Services Center Renovation

The currently unfinished basement in this facility will be renovated to add much needed office space to provide non-profit social services to our community.

02262009

Submitted Requests - Not Approved

6/1/2009

40 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Canton Township

Canton Township

ADA Transition Plan Projects - Phase 1

Project Description Start Date The project includes the improvement of existing sidewalks, building ramps and curb ramps in the public right of way in the Cherry Hill Theater District. 4/1/2009

Canton Township

Canton Township

Intersection Safety Improvements (2009)

Signalization & safety improvements to the intersection of Crowndale at Beck Rd. including traffic signal modernizations with LED pedestrian and signal heads.

7/1/2009

9/30/2009

Canton Township

Canton Township

Watermain Replacement

The existing 12" diameter watermain is undersized. It requires replacement in advance of a future road widening project for a commercial development.

10/1/2009

12/1/2009

Canton Township

Canton Township

Watermain Replacement

The existing 6" diameter watermain is undersized to meet fire flow & pressure. It requires replacement in advance of an industrial building redevelopment project.

6/1/2009

Canton Township

ADA Transition Plan Projects - Phase 2

The project includes the improvement of existing sidewalks, building ramps and curb ramps in the public right of way throughout the community. 6/15/2009

Canton Township

Canton Township

Canton Township

Canton Township

Various preventative maintenance treatments to the existing sanitary sewer system including cured-in-place-pipe (CIPP) lining and manhole rehabilitation throughout Annual Sanitary Sewer Rehabilitation Program Canton Township. 5/1/2009 Replacement of 12" existing watermain on Canton Center Rd. from Palmer to Geddes Watermain Replacement Rd. 10/1/2009

Canton Township

Canton Township

Intersection Safety Improvements (2008)

Various safety improvements to three signalized intersections along Sheldon Center Rd. including traffic signal modernizations with LED pedestrian and signal head. 9/30/2009

7/1/2009

Canton Township

Project Name

Expected Completion Date

T O

s t s

Crowndale and 250,000 Beck

$

250,000 Belleville Road

$

250,000 Willard/Yost

$

Public right of way throughout Canton 500,000 Township.

7/1/2009

$

Existing sanitary sewer system within Canton 500,000 Township

2/1/2010

$

750,000 Canton Center Rd.

7/1/2010

$

Canton Center, 945,000 Sheldon and Joy

9/30/2009

$

Various primary roads in Canton 969,650 Township

7/1/2009

9/30/2009

$

Haggerty, Lilley 1,147,500 and Canton Center

5/30/2009

5/31/2010

$

1,500,000

6/30/2009

6/30/2011

$

2,182,988

7/1/2010

$

Canton Center to 3,800,000 Joy

6/1/2010

$

Palmer to Cherry 4,530,000 Hill

9/1/2009

$

65,000

-N

Canton Township

Canton Township

Annual Road Rehabilitation Program

Canton Township

Canton Township

Intersection Safety Improvements (2009)

Various safety improvements to three signalized intersections along Cherry Hill Rd. including traffic signal modernizations with LED pedestrian and signal head.

e u

q e R

$

Acquisition and rehabilitation of a Henry Ford era factory listed on the National Register of Historic places to incubate arts related businesses, stimulate economic development, serve as an arts education center and preserve the pristine wetlands and forests on the property. This project involves the purchase of existing foreclosed homes and properties, renovation and re-sale to low and moderate income buyers.

Canton Township

Canton Township

Historic Site Restoration

Canton Township

Canton Township

Neighborhood Stabilization Program

Canton Township

Canton Township

Sheldon Center Rd. Reconstruction & Widening

Reconstruction of a two-lane road and widening to a five-lane cross section including traffic signal modernizations with LED pedestrian and signal heads. 9/30/2009

Canton Township

Canton Township

Canton Center Rd. Reconstruction and Widening.

Reconstruction of a two-lane road and widening to a five-lane cross section including traffic signal modernizations with LED pedestrian and signal heads. 9/1/2009 repair boiler system, electrical system, plumbing system, elevator and parking lot paving 3/1/2009

Capital Area Academy Lansing

ub

Capital Area Academy Lansing Capital Area Academy Lansing Capital Area Academy Lansing

02262009

tt i m

S

d e t

O R

P P A

Various preventative maintenance treatments to primary roads throughout Canton. The project includes milling & resurfacing of asphalt, asphalt and concrete patching, crack sealing and ADA compliant curb ramps.

7/1/2009

Route (Infrastructure Funding Request Only) Cherry Hill Theater $ 235,000 District

8/1/2009

9/15/2009

D VE

music room needs to be divided into two classrooms

6/1/2009

9/1/2009

$

20,000

replace sign

6/1/2009

9/1/2009

$

26,000

parking lot repair and re-surface

6/1/2009

9/1/2009

$

33,000

Submitted Requests - Not Approved

41 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Capital Area District Library

Lansing, MI

Project Name

Project Description

Start Date

New Downtown Lansing Library including Central Services

Downtown Lansing Library - This project is the design and construction of a 101,000 square foot facility to house both the central library and administative services functions of the Capital Area District Library. It would be constructed in Downtown Lansing, MI., near the current library and would be a two or three story structure with up to 50 on-site parking spaces. The quality level of the facility would be a 7 or 8 on a scale of 1-10. Design intention would include the latest green building technologies to provide efficient heating, cooling, lighting, insulation, and window technologies. This facility would have an enormous economic impact on the area in terms of the number of direct library jobs created and indirect construction jobs. It would replace an existing facility that is 45 years old, in very poor condition, and does not meet all ADA requirements. It would also provide additional computers for patron use, meeting spaces for taxpayers, reader seating, collection space and allow the staff to provide their high quality services in a modern environment 180 days

Lansing, MI

New Downtown Lansing Library including Central Services and Impression 5 museum

PP

O R

Funding Request

$

32,750,000

Downtown Lansing Library + I5 - This project includes all the facility requirements from the above proposal and the additional space to include a 37,000 square foot children's science museum. This site concept strategy would include each facility having its own distinct physical presence, while keeping them separate enough to maintain their own sense of identity. They would share common areas such as a visitors entry, main lobby area, and parking area. The combination of these two entities would create a new downtown destination with unique synergies that come from both parties located on the same site. All the unique building attributes mentioned in the description of the Downtown Library and Central Services area would apply to this facility, as well. 180 days

24 months

$

40,350,000

Foster Library (Lansing North) - . A new Foster Library would be constructed on East Michigan Ave and would consist of 10,825 square feet.The location of the new library will be more visible to the public The additional size will allow for more public computers and a larger collection with room for business and job training materials. Current databases with practice tests for jobs are already available through the CADL website. The increased space for computers will bring these resources to a greater number of unemployed Lansing residents. New permanent library jobs will be created, at the larger space, connecting more information professionals to the people in need. The current library occupies a 2000 square foot space in the basement of the Foster Community Center, a former school building. The space has low ceiling heights, exposed pipes and high window sills consistent with a basement location. The head librarian has a desk in the middle of the library and the staff workspace is measured in inches within view of the public behind the circulation desk. The library appears cluttered and crowded with little space for books and materials. Materials are weeded 180 days

12 months

$

2,783,000

s

t s e

Route (Infrastructure Only)

D VE

24 months

A T

Capital Area District Library

Expected Completion Date

O N

u q e

Capital Area District Library

Lansing, MI (Ingham Township)

R d

b u S 02262009

e t tt

i m

Foster Library

Submitted Requests - Not Approved

42 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Capital Area District Library

Leslie, MI (Ingham Township)

Project Name

Project Description

Start Date

Leslie Library

Leslie Library - The new Leslie Library will add 3000 square feet to the current 3000 square foot building, increasing shelf space, public computer space, staff work space, readers seating as well as adding a program/meeting room. Currently summer reading programs and other large programs are held in the elementary school across the street. The mostly rural Leslie community built the current library from grants and donated funds and with the support of the community, it soon outgrew its space. Cooperation with the school district will allow the library to expand onto school property. Leslie residents are proud of their library and believe the cultural and educational opportunities created by the library greatly enhance the quality of community life. An Expansion Committee made up of local officials and citizens is enthusiastically exploring grant and donation opportunities to increase the size of the library with an eye to a green design. Green technologies included in the design will provide efficient heating, cooling, lighting and insulation. The addition will provide community members a gathering place for meetings, programs or training, something 180 days

Mason, MI (Ingham Township)

Mason Library

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

12 months

$

1,398,000

Mason Library - A new 17,034 square foot freestanding Mason Library would be constructed in the downtown area, sharing parking with City Hall and the police department and within walking distance of shops and restaurants. Mason draws people from all over the area and circulation is increasing every year. A needs analysis done in 2007 indicated that the current building is inadequate to meet the space needs of the future. The new library would provide space for an increase in the collection, reader seating, computers, staff work space and meeting or program space. The increased needs of the unemployed would be addressed with more access to computers and information on job seeking. New permanent library jobs and construction jobs will have a direct economic effect on the area. Green technologies included in the design will provide efficient heating cooling, lighting and insulation. The current library built in 1939 has a history of problems with mold, flooding, and indoor air quality. 180 days

12 months

$

4,375,000

Meridian Township Library - The new Meridian Township library will be constructed on property purchased by the Township near the Meridian Mall, the Township offices, and high volume businesses of Okemos Road. Plans for the two-story 41,006 square foot building anticipate a balcony and clerestory windows to provide natural light, providing a sense of scale and ambiance to the interior. Using the latest green technology, the building will include the latest green technologies to provide efficient heating, cooling, lighting and insulation. The creation of direct library jobs and indirect construction jobs would have an economic impact on the area. A needs assessment completed in 2007 concluded the current library of 6,000 square feet is inadequate to meet the needs of the community. Restrooms are shared by the public and staff and during peak times, the library is overcrowded with long lines at the desks. More shelf space, readers seating and meeting room space will be created. The current library has a program /meeting/ art gallery room which is in high demand by both the community and the libr 180 days

24 months

$

10,998,000

T O

Capital Area District Library

Expected Completion Date

N s

t s e

u q e

R d

Capital Area District Library

i m

ub

Meridian Township, MI (Ingham Township)

e t tt

Meridian Township Library

S 02262009

Submitted Requests - Not Approved

43 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Capital Area District Library Caro Community Schools Caro Community Schools Caro Community Schools Caro Community Schools

Carrollton Township

Cascade Township

Project Name

Project Description

Start Date

Williamston, MI (Ingham Township)

Williamston Library

Williamston Library - The new proposed 10,619 square foot Williamston Library will be constructed on property along the Grand River, purchased by the Williamston Community Library Foundation. The design will blend the building into the natural river setting and make good use of green technology throughout. Green technologies will provide efficient heating cooling, lighting, insulation and windows. The land, located within walking distance of the downtown area promises to draw attention to the beauty and proximity of the river, encouraging further development and business in Williamston. The new library will provide space for a larger collection, more reader seating, staff work space, more public computers and a meeting room for programs and community groups. Small business resources and job seeking skill training will receive special consideration in the new library. Additional permanent staff will be needed to provide services, and construction jobs will also have an economic impact on the area. The Williamston Library is currently housed in a former school, having moved from its long-time location near City Hall. The original building had numerous is180 days

Village of Caro

Middle

Replace bathroom

Village of Caro

McComb/Schall

Install energy efficient lighting

Village of Caro

High, Middle, McComb/Schall

Technology Infrastructure

Village of Caro

Schall

New Boilers

CarrolltonTownship

Cascade Charter Township

02262009

2009 Water Main Replacement

d e tt

b u S

t i m

36th Street Park & Ride

s t s

T O

-N

e u

A “park-‘n-Ride needs to be constructed at 36th Street and the I-96 Freeway entrance (exit 45). This location is just west of the M-6 freeway that bypasses Grand Rapids to the south. The I-96 access is 60 miles from Lansing and 45 miles from Muskegon (it is amazing the number of Greater Grand Rapids residents that commute daily to Lansing!). The only park-n-ride now is at exit 52 (seven miles to the east) at AldenNash Road. This park-‘n-ride is almost always full! And, most of the vehicles come from a location west of the 326th Street location. The parking area would save miles driven (thousands in a year) and save gasoline, oil and maintenance costs for commuters. In addition, this area has a railroad line abutting it – a possible station for passenger traffic between Lansing and Grand Rapids or Muskegon!

Submitted Requests - Not Approved

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE

12 months

$

2,926,000

5/20/2009

8/15/2009

$

20,000

6/20/2009

9/15/2009

$

140,000

5/20/2009

9/1/2009

$

67,000

$

150,000

$

Flanders Street Michigan Ave to east 1500', Alura Place - Flanders to Schust, Cadillac 400,000 Flanders to Schust

$

250,000

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 4/1/2009

q e R

Expected Completion Date

12/1/2009

44 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Cascade Township

Cascade Charter Township

Project Name

Project Description

Start Date

Kraft/60th Street Utility Improvements

There is an area in the southwest corner (south of the Grand Rapids Airport) of Cascade Township that is a prime location for industrial development, but is not developed due to there being no city water (for both fire protection and water supply) or sewer. And, a portion of the roads are not equipped to handle industrial loads. Kraft Road from 52nd Street to 60th Street needs to be rebuilt to be an “all-season” road. Both Kraft and 60th streets need city water and sewer mains installed. This will create an attractive area for industry to build on, as the airport is less than one mile away along with a rail line the same distance away. We have had interest in the properties in this area, however the lack of roads, water & sewer cause a developer to look elsewhere. This project could bring anywhere from 50-500 jobs to the area. The project costs are estimated at $1,500,000. Sept. 1, 2009

36th Street Park & Ride

A “park-‘n-Ride needs to be constructed at 36th Street and the I-96 Freeway entrance (exit 45). This location is just west of the M-6 freeway that bypasses Grand Rapids to the south. The I-96 access is 60 miles from Lansing and 45 miles from Muskegon (it is amazing the number of Greater Grand Rapids residents that commute daily to Lansing!). The only park-n-ride now is at exit 52 (seven miles to the east) at AldenNash Road. This park-‘n-ride is almost always full! And, most of the vehicles come from a location west of the 326th Street location. The parking area would save miles driven (thousands in a year) and save gasoline, oil and maintenance costs for commuters. In addition, this area has a railroad line abutting it – a possible station for passenger traffic between Lansing and Grand Rapids or Muskegon!

Kraft/60th Street Utility Improvements

There is an area in the southwest corner (south of the Grand Rapids Airport) of Cascade Township that is a prime location for industrial development, but is not developed due to there being no city water (for both fire protection and water supply) or sewer. And, a portion of the roads are not equipped to handle industrial loads. Kraft Road from 52nd Street to 60th Street needs to be rebuilt to be an “all-season” road. Both Kraft and 60th streets need city water and sewer mains installed. This will create an attractive area for industry to build on, as the airport is less than one mile away along with a rail line the same distance away. We have had interest in the properties in this area, however the lack of roads, water & sewer cause a developer to look elsewhere.

Sentinel Pointe Basin

Sentinel Pointe Basin – This area needs both banks stabilized for 250 feet. A small amount of stream bed needs to be cleaned. The total for this project is estimated to cost $30,000.

T O

Cascade Township

Cascade Township

Cascade Township

Cascade Charter Township, Kent County

Cascade Charter Township, Kent County Cascade Charter Township

Cascade Township

Cascade Charter Township Cascade Charter Township Cascade Charter Township

Cascade Township

Cascade Charter Township

Cascade Township Cascade Township

02262009

P P A

O R

Funding Request

Sept. 1, 2010

N s

t s e

e t tt

R d

$

$

i m

$

Sept. 1, 2009

Hidden Hills Basin

Cascade Southeast Basin – This section of drainage area is 1,000 feet long and needs to have the streambanks stabilized. The cost of this project is estimated to be $50,000. Sept. 1, 2009 The Schoolhouse Creek Basin needs the banks stabilized (500 feet) and the sedimentation removed at a total cost of $50,000. Sept. 1, 2009 Hidden Hills Basin – This drainage course runs through a residential area for 2,000 feet. Stabilization of the banks will cost $100,000. Sept. 1, 2009

Highgrove Basin

Highgrove Basin – This is a small basin in the northeast section of the township that is 2,000 feet long and will require $100,000 of bank stabilization. Sept. 1, 2009

ub

Schoolhouse Creek

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

u q e

Cascade Southeast Basin

S

Expected Completion Date

Kraft & 52nd Street south to 60th; west to Broadmoor; 1,500,000 north to Patterson

250,000

Kraft & 52nd Street south to 60th; west to Broadmoor; 1,500,000 north to Patterson

Sept. 1, 2010

$

30,000

Sept. 1, 2010

$

50,000

Sept. 1, 2010

$

50,000

Sept. 1, 2010

$

100,000

Sept. 1, 2010

$

100,000

45 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Cascade Township

Cascade Charter Township

Cascade Township

Cascade Charter Township

Cascade Township

Cascade Township

Cascade Township

Cascade Charter Township

Cascade Charter Township

Cascade Charter Township

Project Name

Project Description

Start Date

Cascade Rec. Park Soccer Field Improvements

The Township has begun the engineering work to "rebuild" the soccer field at our Rec Park. The field is used by AYSO and other soccer teams on a regular basis. It is in poor condition. The rebuild will include underground sprinkling to keep it in pristine condition. Any Federal Funds for this project were anticipated to come from the National Park Service Land & Water Conservation Fund, if positively affercted by the Stimulus Plan. .July 1, 2009

Burger Basin I

Burger Basin 1 – This area is mainly in a residential area that needs about 2,500 linear feet of the streambank stabilized, along with cleaning out of 500 feet of channel bottom. The cost of this project is estimated at $140,000. Sept. 1, 2009

Quiggle Lake Basin

Quiggle Lake Basin – The drainage from Quiggle Lake to the Thornapple River needs about 5,000 feet of streambank restored. Also, about 500 feet of streambed needs to be cleaned. This project will cost $265,000. Sept. 1, 2009

28th Street Pedestrian Access across I-96

The Township has new sidewalk on 28th Street from the "Village" area (east terminus of 28th Street) to Kraft (just east of I-96). Sidewalk needs to be added connect the western commercial district (including hotels and motels) with the east. The sidewalk will be installed under the freeway interchange along 28th Street. After years of discussion, Michigan Department of Transportation has recently provided the approva for the township to move forward on this project. We are working with our engineering firm to put a plan together so the work can be done this summer if funds become available. The expected cost of this project is $1,000,000. Sept. 1, 2009

Energy Saving Streetlights

The Township has a network of decorative street lights in our commercial areas that provide necessary light at night and also provide a positive ambiance to create a desirable shopping area. However, these lights need to be converted to LEDs to conserve energy. The cost of switching to LEDs has been estimated at $15,000 for the district.

LEED Certification for Cascadse Township Buildings

Cascade Township

Cascade Charter Township

Cascade Township

Cascade Charter Township

Cascade Road Basin Storm Water Project

Cascade Township

Cascade Charter Township, Kent County

Sentinel Pointe Basin

Cascade Township

Cascade Charter Township, Kent County

Cascade Township

Cascade Charter Township, Kent County

Cascade Township

Cascade Township

itt

d e t

Expected Completion Date

Funding Request

D VE $

120,000

Sept. 1, 2010

$

140,000

Sept. 1, 2010

$

265,000

Sept. 1, 2010

$

1,000,000

.July 1, 2009

Nov. 1, 2009

$

15,000

The Township is interested in improving our buildings to be LEED certified. We have a township office, two fire stations and a library. While we have not obtained an estimate for the engineering and work to achieve this goal, we would be committed to move forward if funding were available to assist us toward this goal. .July 1, 2009

.July 1, 2010

$

20,000

$

370,000

T O

s t s

O R

P P A

-N

e u

q e R

Sept. 1, 2010

Cascade Road Basin – This is an area that needs about 5,000 linear feet of streambank stabilized along with 2,500 feet of the bed cleaned out. Some culvert replacement is also planned. The cost of this project is estimated to be $370,000.

Sentinel Pointe Basin – This area needs both banks stabilized for 250 feet. A small amount of stream bed needs to be cleaned.

Sept. 1, 2009

Sept. 1, 2010

$

30,000

Cascade Southeast Basin

Cascade Southeast Basin – This section of drainage area is 1,000 feet long and needs to have the streambanks stabilized.

Sept. 1, 2009

Sept. 1, 2010

$

50,000

Schoolhouse Creek

The Schoolhouse Creek Basin needs the banks stabilized (500 feet) and the sedimentation removed.

Sept. 1, 2009

Sept. 1, 2010

$

50,000

Cascade Charter Township, Kent County

Hidden Hills Basin

Hidden Hills Basin – This drainage course runs through a residential area for 2,000 feet.

Sept. 1, 2009

Sept. 1, 2010

$

100,000

Cascade Charter Township, Kent County

Highgrove Basin

Highgrove Basin – This is a small basin in the northeast section of the township that is 2,000 feet long. Sept. 1, 2009

Sept. 1, 2010

$

100,000

u S

02262009

bm

Submitted Requests - Not Approved

Route (Infrastructure Only)

46 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Cascade Township

Cascade Township

Cascade Township

Cascade Township

Cascade Township

Cascade Township

Cascade Township

Cascade Charter Township, Kent County Cascade Charter Township, Kent County Cascade Charter Township, Kent County

Cascade Charter Township, Kent County

Cascade Charter Township, Kent County

Cascade Charter Township, Kent County Cascade Charter Township, Kent County

Project Name

Cass County Council on Aging Cass County Council on Aging

Sept. 1, 2010

$

120,000

Burger Basin I

Burger Basin 1 – This area is mainly in a residential area that needs about 2,500 linear feet of the streambank stabilized, along with cleaning out of 500 feet of channel bottom. Sept. 1, 2009

Sept. 1, 2010

$

140,000

Quiggle Lake Basin

Quiggle Lake Basin – The drainage from Quiggle Lake to the Thornapple River needs about 5,000 feet of streambank restored. Also, about 500 feet of streambed needs to be cleaned. cost $265,000. Sept. 1, 2009

$

265,000

28th Street Pedestrian Access across I-96

The Township has new sidewalk on 28th Street from the "Village" area (east terminus of 28th Street) to Kraft (just east of I-96). Sidewalk needs to be added connect the western commercial district (including hotels and motels) with the east. The sidewalk will be installed under the freeway interchange along 28th Street. After years of discussion, Michigan Department of Transportation has recently provided the approva for the township to move forward on this project. We are working with our engineering firm to put a plan together so the work can be done this summer if funds become available.

$

1,000,000

Energy Saving Streetlights

The Township has a network of decorative street lights in our commercial areas that provide necessary light at night and also provide a positive ambiance to create a desirable shopping area. However, these lights need to be converted to LEDs to conserve energy.

.July 1, 2009

Nov. 1, 2009

$

15,000

LEED Certification for Cascadse Township Buildings

The Township is interested in improving our buildings to be LEED certified. We have a township office, two fire stations and a library. While we have not obtained an estimate for the engineering and work to achieve this goal, we would be committed to move forward if funding were available to assist us toward this goal. .July 1, 2009

.July 1, 2010

$

20,000

Cascade Road Basin Storm Water Project

Cascade Road Basin – This is an area that needs about 5,000 linear feet of streambank stabilized along with 2,500 feet of the bed cleaned out. Some culvert replacement is also planned.

Sept. 1, 2010

$

370,000

CASMAN Academy

Our building, erected in 1952 has its original single-pane windows, many not opening or closing correctly and wasting a great amount of heat because they are inefficient. We propose replacing them with energy efficient windows. Upgrading the airexchange system would provide fresh air for our students and staff. Insulation in the roof area would help tighten our building and make it more energy efficient. Adding wall insulation and siding to the front of the building and an airtight vestibule to our main entryway would eliminate a great amount of heat loss. Our building has asbestos in its floor tile and in insulation around water pipes, and although it is being managed safely, it is a drain on our budget. This is an opportune time to have it abated. Our boiler which provides heat throughout the building is outdated and inefficient. Replacing it with several smaller, more energy-efficient units is proposed. Pipes carrying hot water are corroded and leak, needing replacement. Paving the gravel parking area would also save on cleaning time and products throughout the building. We would propose erecting a wind spire on our property as well as photovoltaic cells o6/1/2009

9/1/2010

$

401,900

Fitness Facility Addition

Construct and equip 5,000 sq ft addition to senior center and move all fitness programs into it. Remodel current fitness space for use as resource center and computer lab.

8/1/2009

11/30/2009

$

1,080,000

New Roof

Replace all flat roof on Senior Center building at 60525 Decatur Rd, Cassopolis, MI

5/1/2009

6/1/2009

$

61,930

ub

S

Penn Township Penn Township

02262009

Funding Request

Cascade Rec. Park Soccer Field Improvements

t i m

Manistee

Start Date

The Township has begun the engineering work to "rebuild" the soccer field at our Rec Park. The field is used by AYSO and other soccer teams on a regular basis. It is in poor condition. The rebuild will include underground sprinkling to keep it in pristine condition. .July 1, 2009

d e tt

CASMAN Academy

Project Description

Expected Completion Date

T O

s t s

-N

Submitted Requests - Not Approved

Sept. 1, 2010

P P A

e u

q e R

O R

D VE

Sept. 1, 2009

Route (Infrastructure Only)

47 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Cedarville Township

Project Description

Beaver Island Tower

Looking Back Looking Forward

A new addition has been started to the present museum, doubling the size of the current building. We need funds to hire professional exhibit builders for our Native American display, Railroad and early Lumbering history displays, General store and the construction of display cubicles that will house diaplays such military, Doctors office and a pioneer home. The flooring and sound system are also part of this faze of the project. One of our goals is to make some of the display areas interactive, especially the Native American display. 11/1/2008

Cedarville Township, Menominee County

Fire Station Expansion

The fire building no longer meets the needs of the department or state codes. Our men never had a bathroom or shower facilities in the fire hall. To have meetings, we have to move out all of the trucks due to the fact that we do not have a meeting room either. Some equipment has to remain outdoors.

Mt. Pleasant

CMU's University Art Gallery hosts exhibitions of nationally and internationally recognized artists working across a variety of media appropriate to a broad area of public interest. Programs include professionally curated and juried shows, many of which include specialized programs for area youth designed and led by arts educators and CMU students engaged in service learning. These collaborations introduce children from underserved communities to arts and cultural resources, bring families and the greater community to the arts and cultural resources available at CMU, and return value to the community through enhanced local economic activity and cultural tourism. Funding is sought for hiring support personnel, shipping and exhibition costs, University Art Gallery - Exhibition Series with publication and promotion costs, and supply costs for community outreach activities Community Outreach to Youth over two project years. 5/9/2009

Cedar Springs Mi. Solon twp. Kent co.

A T

s

Central Michigan University

Start Date

Construction of a public safety radio transmission facility at an exisiting tower site. The constructio would include an equpiment shelter, emergency power generator, lightning suppression, etc. While most of the jobs created for this project would be for the construction project, there will be ongoing maintenance postions for radio and generator service techniciains to monitor and service equipment. 6/1/2009

Peaine Township, CCE Central Dispatch Charlevoix County

Cedar Springs Museum

Project Name

t s e

Expected Completion Date

8/31/2009

200,000

$

300,000

$

500,000

4/11/2009

$

100,000

4/10/2009

$

200,000

Aug. 2009

O N

u q e

D VE $

O R

PP

Funding Request

Route (Infrastructure Only)

R d

Central Michigan University

The movie will bring alive Dr. Madgett’s early struggles and triumphs when she first came to Detroit, the development of her poetry, her work in a wide range of community efforts, her philosophy and practice as an educator, and enormous influence of her work as an editor in encouraging, challenging, and guiding two generations of young poets. We follow Madgett through her early life in Detroit; we hear her thoughts on what influenced her, on the pressures and joys of the creative process, the roles of family, colleagues, friends, and the Detroit community in shaping her vision. We see and hear her in performance from the 1980’s to the present. The juxtaposition of performance and interviews, the capturing of Detroit artifacts and Film documentary of Naomi Long Madgett: institutions, allow us to feel her creative risks and her growing commitment to words, Detroit's Poet Laureate and the City's Literary people, the city of Detroit, and spiritual values. Funding is sought for hiring research Heritage and production staff, equipment rentals, and promotion. 5/9/2009

e t tt

i m

b u S

Mt. Pleasant

02262009

Submitted Requests - Not Approved

48 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Central Michigan University

Mt. Pleasant

Project Name

Project Description

Start Date

For over 30 years the Clarke Library has preserved on microfilm historic Michigan newsapers, with a focus on the states' rural communities and smaller, weekly newspapers.To forward this endeavor, the library has worked with a variety of partners, ranging from local history societies to the Library of Congress and the National Endowment for the Humanities . Building on this experience, and supplementing it with recently acquired technology that makes it possible to both preserve on microfilm and then distribute digitized versions of newspaper pagess via the internet, this project will preserve and make available to the public (through both an appropriate local public library and the Library of Michigan) approximately 600,000 pages of local newspaper material, again focusing primarily on historic newspapers from underserved, rural communities. The project will benefit both scholars, seeking local history information, and genealogists, who in great numbers turn to local Historic Newspaper Preservation and Access newspapers as a primary source of information. 3/15/2009

T O

Central Michigan University

Central Michigan University

N s

st

Mt. Pleasant

Michigan Story Festival

Mt. Pleasant

CMU's School of Music Annual Summer Music Camp is open to all high school woodwind, brass, percussion and vocal students. Students interact with CMU faculty members, perform in chamber ensembles, and participate in full orchestra or concert band in our state-of-the-art concert halls. While at Music Camp, students stay in the CMU residence halls, eat in the residential restaurant and experience college life first hand. To include as many students as possible in this unforgettable camp experience, funding is sought for student scholarships and recruitment materials across two CMU School of Music Annual Summer Camp project years. 5/9/2009

d e tt

t i m

b u S

Central Michigan University

Mt. Pleasant and Idlewild, MI CMU/Idlewild Orchestra and Choral Camp

Charleston Township

Charleston Township

Michigan Ave. & 40th Street Water Main

Charleston Township

Charleston Township

L Ave. & 38th St. Water Main

Charleston Township

Charleston Township

E. Michigan Ave. Sanitary Sewer

02262009

q e R

A five-day camp focused on African-American music administered as a special program within CMU’s long-standing Summer Music Camp. It will feature daily workshops in music theory, music technology, as well as rehearsals, sectionals, private lessons, and concerts by students, camp faculty, and guest artists. A unique feature of the camp will be a series of daily presentations on African American music and culture by noted scholars and performers. The camp will conclude with a field trip to Idlewild for a student performance and guided learning experiences in the Idlewild Historical Center. While at Music Camp, students stay in the CMU residence halls, eat in the residential restaurant and experience college life first hand. Campers and Guest Instructors will be recruited from high school music ensembles in the Detroit, Flint, Saginaw, Benton Harbor, and Baldwin public schools. 5/9/2009 Construct water main in Michigan Ave. & 40th St. along with booster stations/pressure reducing stations. 8/15/2009 Construction water main in "L" Ave. & 38th St. along with booster stations/pressure reducing stations. 8/15/2009 Construction sanitary sewer in E. Michigan Avenue, Between McCollum and Kalamazoo River 5/15/2009

Submitted Requests - Not Approved

O R

P P A

The two-day Michigan Story Festival offers a complete showcase of the power of storytelling in all its art forms. Michigan Story Festival is one of the only storytelling festivals to integrate the stories of many cultures and traditions. With the exception of the opening performance, there is no charge to experience the magic of Michigan Story Festival events and presentations. A visit to the award-winning Michigan Story Festival is an opportunity to experience the wonder of story telling at its finest, with national, regional, and local storytelling masters. Funding is sought for hiring support personnel, paying travel and honoraria for guest presenters, event production and technical support, advertising, and promotional materials over two project years. 5/9/2009

e u

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

3/14/2011

$

496,667

4/11/2009

$

140,000

4/11/2009

$

120,000

8/9/2009

$

80,000

11/15/2010

$

1,800,000

11/15/2010

$

1,800,000

11/15/2009

$

75,120

49 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Charlevoix County Road Commission

Beaver Island, MI

Charlevoix County Road Commission

Evangelin Twp., Bay Twp., Hay Twp., Charelvoix Twp.

Charlevoix County Road Commission

South Arm Township

Charlevoix Township

Charlevoix Twp

Commerce Township

Commerce Township

Commerce Township

Commerce Township

Project Name

Start Date

Beaver Island Road Commission New Maintenance Garage

Beaver Island is an island in Lake Michigan, on which the Charlevoix County Road Commission maintains about 92 miles of public roadways. This project will provide the road commission with a maintenance garage building and office in which to store their equipment and materials, and provide an adequate space to base their Beaver Island maintenance operations. The proposed project will replace a woefully inadequate existing facility. The current garage was constructed in the 1920’s.The new facility will meet today’s building and energy code requirements. It will employ energy efficient technology and green design features, to reduce energy costs and environmental impacts. It will provide adequate heated equipment storage space, office and living space for road maintenance personnel. This project is needed to provide the people of Beaver Island with a road maintenance garage facility that meets current codes and standards and that can house equipment in a fashion that most communities take for granted.

Boyne City-Charlevoix Road Rehabilitation

Road rehabilitation including 13.65-Miles of HMA base crushing and shaping, HMA paving, grading, minor vertical alignment corrections, curve superelevation corrections, drainage and roadside safety improvements. Also includes improvements to 43 side road intersections and storm sewer through Horton Bay.

Ellsworth Road Rehabilitation

Road rehabilitation including 3.79-Miles of HMA base crushing and shaping, HMA paving, grading, minor vertical alignment corrections, curve superelevation corrections, drainage and roadside safety improvements. Also includes improvements to 5 side road intersections and storm sewer through Horton Bay.

T O

New well Water Tower

Newton Rd FM

d e t

Sleeth Road H2S Project

Commerce Township Charter Township of Harrison Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township

Commerce Township

Effluent Force Main

Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP

Harrison Township Harrison Township

Harrison TWP Harrison TWP

Acacia Road Sanitary Sewer Extension Union Lake Sanitary Sewer Boniare Court Sanitary Sewer Chartier Bridgeview Watermain Ereplacement Elmite Sanitary Sewer Hazel Willomere Hamon Long Winkler Beachwood stormwater pump station rehabilitation Pineridge

b u S

e u

q e R

Sanitary Sewer Force Main $2,000,000.00

Commerce Township

tt i m

s t s

-N

To construct a 1.5 Million Gallon water storage tower $2,200,000.00

Commerce Township

02262009

Project Description

Expected Completion Date

O R

Funding Request

D VE

P P A 6/1/2009

6/1/2009

9/1/2010

11/1/2009

$

Boyne City Limits to Western Ave. 6,826,800 (13.65-Miles)

$

East Jordan City Limits to Antrim 1,879,400 County Line

$ 6/1/2009

4/1/2009

250,000

6/1/2010

Near Huron Valley Hospital

9/1/2009

From Commerce Road to Newton Road, south to Oakley Park Road Located near Huron Valley Hospital Near WWTP off of Welch Road

200 feet of sanitary sewer to remove H2S emissions from the force main $90,000.00 5/1/2009

11/1/2009

Effluent force main for WWTP $500,000.00

4/1/2009

10/1/2009

Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Replacement of failing watermain Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Replacement of storm water pump station to protect upstream properties from flooding Extend sanitary sewer to replace failing septic systems

7/1/2009 7/1/2009 7/1/2009 7/1/2009 8/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

10/15/2009 6/1/2010 4/1/2010 10/15/2009 6/1/2010 10/15/2009 4/1/2010 6/1/2010 6/1/2010 6/1/2010 6/1/2010

$ $ $ $ $ $ $ $ $ $ $

230,000 250,000 250,000 350,000 350,000 400,000 400,000 500,000 500,000 500,000 500,000

8/1/2009 7/1/2009

6/1/2010 6/1/2010

$ $

500,000 600,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

50 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Harrison Township

Harrison TWP

Prentiss Pump Station Upgrade

Increase capacity to accommodate industrial development in northern end of township8/1/2009

6/1/2010

$

650,000

Harrison Township Harrison Township Harrison Township

Harrison TWP Harrison TWP Harrison TWP

Increase capacity to accommodate industrial development in northern end of township8/1/2009 Clean out of Regional Drain 8/1/2009 Clean out of Regional Drain 8/1/2009

6/1/2010 6/1/2010 6/1/2010

$ $ $

800,000 850,000 1,000,000

Harrison Township

Harrison TWP

Coleridge Pump Station Upgrade Petit-ConleT Drain Cleanout Venter DeBeuff Drain Cleanout L'Anse Creuse/Tucker Trunk Sanitary Sewer Extension

Extend sanitary sewer to replace failing septic systems

6/1/2010

$

1,200,000

Harrison Township

Harrison TWP

Ashland Chartier Sanitary Sewer Extension

$

1,350,000

Harrison Township

Harrison TWP

Lenfesty Sanitary Sewer Rehabilitation

9/1/2009

$

250,000

Harrison Township

Harrison TWP

Irwin Drive Water Main & Meter Pit

Extend sanitary sewer to replace failing septic systems 7/1/2009 Sewer Lining/Repair to reduce infilitration and protect ajacent properties against sewe back up 5/1/2009 New connection to DWSD water system to provide necessary redundancy and seervice pressures to northern portions of the township 5/1/2009

4/1/2010

$

1,400,000

Lyon Township

Lyon Township

WWTP Expansion

Expansion of Lyon Township's Waste Water Treatment Plant $21,000,000.00

6/1/2009

12/1/2010

Lyon Township

Lyon Township

Pontiac Trail WM

Approximately 2 Miles of Water Main $3,500,000.00

6/1/2009

2/1/2010

10 Mile and Chubb Roads Along Nine Mile and Pontiac Trail

Lyon Township

Lyon Township

New Hudson Well Expansion

Expansion of Lyon Township's Well House along with an iron removal system $3,000,000.00

6/1/2009

2/1/2010

South Hill and Twelve Mile Road

Energy Efficiency Improvements

Public Works - Building & Grounds Maint. Facility. Expansion, Insulation, Heating & Electrical Improvements. Community Center - Install Insulation, Roof and Exterior Siding.

6/30/2009

6/30/2010

$

850,000

Sewage Treatment Plant

Oscoda - Wurtsmith Sewage Treatment Plant - Modifications for Industrial Sludge & Septage Treatment capabilities. Install lagoon aerators and seepage bed dosing equipment.

6/30/2009

9/30/2010

$

1,800,000

9/30/2010

$

450,000

12/31/2009 9/30/2010

$ $

60,000 200,000

6/30/2010

$

1,600,000

11/1/2010

$

10,642,500

4/1/2010

$

1,250,000

8/1/2010

$

1,400,000

5/1/2010

$

1,975,887

9/1/2010

$

3,006,250

10/1/2009

$

625,000

10/1/2009

$

750,000

6/1/2010

$

1,005,000

9/9/2009

$

32,480,000

Oscoda Township

Oscoda Township

Oscoda Township

Oscoda Township

Oscoda Township

Oscoda Township

Downtown Streetscape

Oscoda Township Oscoda Township

Oscoda Township Oscoda Township

Public Water System Extension Sewage Collection System

e u

Oscoda Township

Industrial Park Expansion

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Sanitiary Sewer Lining Sanitary Sewer Retention Basin at Calvert Pump Station

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Rehabilitation of Lift Stations

Waterford Township

Waterford Township

Main Street Water Tower Lead Abatement

Waterford Township

Waterford Township

Cass Lake Water Tower Lead Abatement

Waterford Township

Waterford Township

Huron Gardens Gate Valve Replacement

Waterford Township

Waterford Township

Water Main Relining

m b u

S

02262009

A T

O N

eq

e t t

Ejector Station Rehabilitation Campbellgate Farms Sanitary Sewer Extension

Oscoda - Wurtsmith Industrial Park - Infrastructure extension / completion. Demolish vacant decaying buildings. Survey & Platting. Extend road and utility infrastructure. Install gateway and 'way-finding' signage. 6/30/2009 Installation of reinforcing lining for approximately 320,000 feet of existing vitrified clay sanitary sewer 5/1/2009 Construction of a underground retention vault to hold storm surge from infiltration durring a storm event. 4/1/2009 Rehabilitation of the existing wet wells of four converted ejector stations. Replacement of pump station equipment. 7/1/2009 Construction of approximately 5,000 linear feet of 8" sanitary sewer, and replacement of the disturbed pavement. 4/1/2009 Rehabilitation of 11 sanitary sewer lift stations including new tanks, pumps, valves and piping, controls, and security. 7/1/2009 The removal and containment of existing lead based paint from the water tower as well as a new coat of paint. 5/1/2009 The removal and containment of existing lead based paint from the water tower as well as a new coat of paint. 5/1/2009 Replacement of 150 existing gate valves in the Huron Gardens area watermain system. 5/1/2009 Installation of reinforcing lining for approximately 144,000 feet of existing asbestoscement water main 5/1/2009

Submitted Requests - Not Approved

O R

PP

Downtown' / 'Central Shopping' District - Continue / extend on-going initiatives that involve makeover of sidewalks, decorative streetlight fixtures and green spaces within the Downtown. 6/30/2009 Water Distribution Main Pipeline - Extend a section of main pipeline - serving airport industrial park properties. 6/30/2009 Lift Station #4 - Wet Well Improvements. Lift Station #5 - Corrosian Control 6/30/2009

R d

Oscoda Township

it

st

s

7/1/2009

6/1/2010

D VE

51 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Waterford Township

Waterford Township

Project Name Section 9 and Nelsey Road Water System Booster Stations

Waterford Township

Waterford Township

Windmill Pond Flood Mitigation

Waterford Township

Waterford Township

Maceday Water Tank Roof Rehab

Waterford Township

Waterford Township

Sanitary Manhole Rehabilitation

Waterford Township

Waterford Township

Project Description

Start Date

Construction of 2 water system booster stations and 4 pressure sustaining valves.

6/1/2010

$

393,750

9/1/2009

$

380,000

$

1,287,500

$

3,120,000

Water Treatment Plant 32-1

Construction of a 27" concrete pipe storm water outlet to Eagle Lake. 5/1/2009 Removal of an existing concrete roof and installation of a color matched aluminum geodesic dome. 4/1/2009 Inspection of 2,400 sanitary sewer Manholes and rehabilitation of an expected 30% of failing manholes. 4/1/2009 Construction of new source well and a pipe line from well to the water treatment plant. Removal and replacement of existing filter equipment. 5/1/2009

$

3,260,000

Private Property Inflow Elimination / Stormwater Conveyance

Instalation of a stormwater conveyance pipeline, disconnection of existing private footing and sump drains from sanitary sewer, and connection of private footing and sump drains to new conveyance system.

8/1/2010

$

34,247,500

9/30/2010

$

500,000

9/30/2010

$

24,670,000

9/30/2010 9/30/2010

$ $

41,500,000 41,500,000 M-21/I-75

Flint Township

Project Description --- As a Center for Energy Excellence, we have targeted areas in our community for Alternative Energy Research and Development including Wind, BioFuels, Electric Vehicles, Hydrogen Vehicles, etc. These areas will need some investment in infrastructure and many of the buildings may be rehabilitated, retooled or new construction may need to occur. We would request $350,000 to pay for the needed infrastructure including rehabilitation or new construction of sewer/water lines, fire suppression lines, and roadways. To generate the response needed from companies and investors who may wish to locate here, we would request $150,000 to be used to issue bonds for but not limited to the following: the rehabilitation of, the new Center for Energy Excellence - Jobs Creation construction of, and/or the retooling of existing businesses interested in joining the search for alternative energy sources. 4/1/2009 Charter Township of Flint Incentive Package

Flint Township

Project Description - As a Center for Energy Excellence, the Charter Township of Flint will be a leader in the use of Alternative Energies. We propose to build an Energy Excellence Center using Green Architecture, LEED Design and the latest standards and trends in Green Technologies, incorporating the use of Geothermal Technologies Solar Energy, Green Roofs, Recycled Materials and renewable and sustainable building materials. The Energy Excellence Center would contain a Municipal Building, Recreation/Fitness Center, Library, Alternative Energies Research and Community Education Center, Senior Facilities and space for independent companies to lease (ie. coffee shop, restaurants, office space, daycare center, etc.). This will be a walkable site-plan centered around a Hero's Plaza Veteran's Memorial. By utilizing Green Technologies, the site will focus on educating the public by demonstrating how they can incorporate Alternative Energy Technology in their homes and businesses. Center for Energy Excellence - Green Building Pedestrian access from the surrounding residences, senior living complexes and professional offices will enhance the use and viability of the development. This plan w 4/1/2009 Charter Township of Flint Initiative

T O

d e tt

t i m

ub

Restoration and Purchase of Conservation Charter Township of Flint Easements in River Flood Zones Flint Township M-21/I-75 Interchange

02262009

q e R

5/1/2009

N s

st

e u

We hope to purchase and/or restore conservation easements in river flood plain zones. Non-motorized path projects are ready for implementation in these zones. The easements are required in order for the projects to move forward. Impact and Engineering studies have been completed. Immediately Design, property acquisition, & constructionof the M-21/1-75 Interchange 4/1/2009

Submitted Requests - Not Approved

10/1/2010 12/1/2009

O R

P P A

Waterford Township

S

Funding Request

Route (Infrastructure Only)

4/1/2009

Waterford Township

Flint Township Flint Township

Expected Completion Date

9/1/2010

D VE

52 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Charyl Stockwell Academy Cheboygan Co Road Comm Cheboygan Co Road Comm Cheboygan Co Road Comm Cheboygan Co Road Comm Cheboygan Co Road Comm Cheboygan Co Road Comm Cheboygan Co Road Comm

Brighton Township

Project Name

Taylor Road Middle School and High School

This project is the construction of a new Middle School and High School for a public charter school in Brighton Township, Livingston County. The project will consist of three builidings to serve up to 800 students and include classroom, laboratory, and indoor actities spaces. The classroom space will be designed around mulitiple learning styles with an emphasis placed on the ability to adapt to every changing education pdeagogy. A "high-tech" infrastructue will support the education process. Sustainable aspects will ensure that the school is a healthy and invigorating place to learn and work. Energy efficient mechanical systems, low voc and renewable materials and effective day-lighting will be employed. The project will include the sensitive development of the school's 50 acre rural site which will provide natural environment for students to both learn and recreate. The site will provide an additional classroom and laboratory to the school, emphasizing the native flora and fauna, hydrology and biology or Southeast Michigan. In an age of child inactivity, this exterior learning area will provide an environment for students to learn active healthy h7/1/2009

$

150,000

$

200,000

$

270,000

$

500,000

$

1,707,000

$

1,832,000

$

2,140,000

Roof replacement, exterior door replacement, finish and casework replacement, boiler replacement, upgrade energy management controls, replace plumbing fixtures, electrical upgrades, replace kitchen equipment, replace furniture. On site, replace parking lots, retaining wall replacement, extend storm sewer system, replace playground surfacing and equipment, landscaping.

$

1,038,063

Refinish exterior entry decking, cooling tower replacement, upgrade HVAC equipment and energy management controls, replace furniture, new window blinds, electrical upgrades. On site, repave parking lots, drives and playground, replace playground soft surfacing and equipment, landscaping.

$

766,250

Beach Middle School Renovation

Roof replacement, building finishes and casework replacement, boiler replacement, upgrade HVAC equipment and energy management controls, replace drinking fountains, electrical upgrades, pool equipment, new café tables and office furniture. On site, repave bus transfer lot, replace sidewalks, resurface tennis courts, landscaping.

$

1,432,270

Washington Street Education Center Renovation

Bldg. 500 roof replacement, replace finishes, replace HVAC equipment, remodel restrooms (bldg. 500, 400, 300), remodel gym and mezzanines, replace doors and windows bldg. 400, add entry canopies bldg. 100, add ramp to stage. On site, repave parking lot, new irrigation system, replace playground surfacing and equipment, resurface track, replace sidewalks, add sidewalks, replace plumbing fixtures at stadium, new parking lot lighting, landscaping.

$

1,702,394

A T

Tandem Trucks (4 total)

s

Trowbridge Road

st

Quarry & Ostrander Roads

e u

Mann Road Reconstruction

q e R

North Creek Elementary School Renovation

tt i m

d e t

Pierce Lake Elementary School Renovation

ub

S

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 20,000,000

Long Lake Road Paving

Chelsea School District Chelsea

PP

O R

Funding Request

$

Indian River Garage Fuel Facility

Chelsea School District Chelsea

02262009

Start Date

Cheboygan Garage Fuel Facility

Chelsea School District Chelsea

Chelsea School District Chelsea

Project Description

Expected Completion Date

53 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Chelsea School District Chelsea

Chelsea High School Renovation

Chelsea School District Chelsea

Transportation Center Renovation

Remodel weight room, remodel storage in scene shop, replace flooring, upgrade HVAC equipment and energy management controls, electrical upgrades, replace exterior door hardware, replace toilet partitians, paint gym and receiving ceilings. On site, Repave parking lots, irrigation system, resurface tennis courts, replace sidewalks, landscaping. Bus wash bay building addition with storage, replace HVAC units. On site, repave parking lots, new electric gate.

South Meadows Elementary School Renovation

Gymnasium and music room addition, replace windows, new roofing, replace boilers, upgrade HVAC equipment and energy management system, electrical upgrades, replace kitchen equipment, new window blinds. On site, repave parking lot, extend storm drain system, replace playground surfacing and equipment, landscaping. 8/1/2009

Chelsea School District Chelsea

Cherryland Electric Cooperative (CEC) is “shovel ready” on their next smart grid Initiative with the deployment of a Supervisory Control and Data Acquisition (SCADA) system to monitor system demand and load flow such that load control can be initiated on Traverse City Chesterfield Township Chesterfield Township Chesterfield Township Chesterfield Township

T O

eq

N s

st

Chesterfield Township Chesterfield Township

Construct a water system reservoir to reduce energy required to operate entire Water Storage regional (DWSD) system as well as increase system reliability and available fire flows.8/1/2009 Jefferson Avenue Sanitary Sewer Force Main Extend existing force main to increase system efficieny and reroute flow to a Extension downstream district 6/1/2009

Chesterfield Township Chesterfield Township

Connie Bowles Park

Chesterfield Township Chesterfield Township

Chesterfield Township Chesterfield Township

Chesterfield Township Chesterfield Township

u S

Chesterfield Township Chesterfield Township Chesterfield Township Chesterfield Township

R d

e t t

Funding Request

D VE

2,702,236

$

2,866,965

8/30/2010

$

4,066,325

9/1/2010

$

1,650,000

4/1/2010

$

4/1/2010

$

23 Mile Road (M2,300,000 29) 23 Mile Road (M1,000,000 29)

8/1/2010

$

Chesterfield Road, North of 24 Mile 2,400,000 Road

12/31/2009

$

1,500,000 Jefferson Ave 25 Mile, east of 300,000 Gratiot

Improvements (parking lot, entrance, grading) to create a new Township park

8/1/2009

10/1/2009

$

Municipal Parking Lot Reconstruction

Reconstruct the failing municipal parking lot

7/15/2009

10/1/2009

$

Municipal Offices, 500,000 Sugar Bush Road

Gratiot Ave Water Main - 21 Mile to 22 Mile Gratiot Ave Water Main - GFS to 24 Mile Road 23 Mile Road Water Main - Gratiot to Waterside

Replace aging water main along this busy and important Township corridor

3/1/2009

8/1/2009

$

750,000 Gratiot Ave (M-5)

Replace aging water main along this busy and important Township corridor

3/1/2009

8/1/2009

$

500,000 Gratiot Ave

3/1/2009

8/1/2009

$

5/1/2009

12/31/2009

$

350,000 23 Mile Road (M-5) 24 Mile and 800,000 Fairchild Rd

it

bm

Chesterfield Township Chesterfield Township

24 Mile/Fairchild PRV

Replace aging water main along this busy and important Township corridor Replace underground PRV/meter vault with new above-ground building to improve safety and operation

Chesterfield Township Chesterfield Township

26 Mile Rd Water Main

Extend water main to this unserved area of the Township

4/1/2009

10/1/2009

$

Chesterfield Township Chesterfield Township

New Haven Road Water Main

Extend water main to this unserved area of the Township

4/1/2009

10/1/2009

$

02262009

Route (Infrastructure Only)

$

O R

P P A

Cherryland Electric Cooperative (CEC) is “shovel ready” on their next smart grid Initiative with the deployment of a Supervisory Control and Data Acquisition (SCADA) system to monitor system demand and load flow such that load control can be initiated on an intelligent basis to manage both distribution system demands and power supply demand. This demand response scheme will be integrated with our Advanced Metering Infrastructure (AMI) system. Load control measures will be implemented through the SCADA system to operate existing load management transponders, through new and upgrade transponders, and new residential Smart Meter thermostats giving us the ability to control heating, air conditioning, and water heading loads and send pricing signals for customer level demand management as well. Our existing two-way power line carrier communication AMI system will be the back bone for the communication into our members’ homes. The SCADA system includes master station and work stations at our central office and connects to existing equipment at 16 substations in order to have real-time monitoring of system demands and load flow 5/1/2009 Demand Response 23 Mile Road Water Main - I94 to Baker (north Replace major trunkline water main, which is experiencing serious corrosion and side) excessive breaks 7/1/2009 23 Mile Road Water Main - I94 to Baker Replace aging water main along this busy and important Township corridor and fill in (south side) gaps/complete loops 7/1/2009

e u

Expected Completion Date

Submitted Requests - Not Approved

1,950,000 26 Mile Road New Haven Road 800,000 (M-19)

54 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Chesterfield Township Chesterfield Township

Project Name

Project Description Start Date Extend water main to this unserved area of the Township, completing a vital Township loop 4/1/2009

10/1/2009

Route (Infrastructure Funding Request Only) Pollard Park, east $ 100,000 of M-19 $

850,000 Sugar Bush Road

$

450,000 Sugar Bush Road

$

550,000 23 Mile Road (M-5)

Expected Completion Date

Chesterfield Township Chesterfield Township

Pollard Park Water Main Sugar Bush Road Water Main - 21 Mile to Cotton

Replace and enlarge aging water main along this Township corridor

5/15/2009

4/1/2010

Chesterfield Township Chesterfield Township

Sugar Bush Road Water Main - 21 Mile to end Replace and enlarge aging water main along this Township corridor

5/15/2009

4/1/2010

Chesterfield Township Chesterfield Township

23 Mile Road Pump Station Replacement

5/15/2009

4/1/2010

Chikaming Township Chikaming Township Chikaming Township Chikaming Township

Chippewa County

Chippewa County

Chippewa County

Chickaming Twp, Berrien County Chickaming Twp, Berrien County Chikaming Township, Berrien County Chikaming Township, Berrien County

Chippewa County

Chippewa County

Sault Ste. Marie

Replace aging and failing sanitary sewer pump station

Turner Shores Watermain

Install 8" watermain for Turner Shores subdivision

Sawyer Road Watermain

Install 8" watermain along Sawyer Road

Saywer Road Watermain

Water system improvements, Red Arrow Hwy. to Flynn Road.

Turner Shores Watermain

Water system improvements, Turner, Dingman, Bluff, Porter and Thomas streets.

Feeding Chippewa County Seniors

Due to budget constraints, Chippewa County has currently had to cut it's appropriation to the "meals on wheels" program to seniors by nearly twenty five percent. With pressing economic times this has been devastating to the program. And at the same time need among seniors has increased dramatically. The County is asking for money for the next two years to enhance funding for the program. 3/1/2009

Safe Citizens Project

t i m

d e tt

Historic Courthouse Renovation Project

O R

5/1/2009

P P A 5/1/2009

7/1/2009

D VE

7/1/2009

Turner, Dingman, Bluff, Porter and 450000 Thomas Streets Red Arrow Hwy to 2400000 Flynn Road

4/15/2009

Oct. 31, 2009

$

749,375

4/15/2009

Aug. 31, 2009

$

271,000

3/1/2011

$

100,000

Chippewa County has lost three road patrol positions in the last few years due to lack of funding as well as two school liaison officers. This has created unsafe conditions for our Sheriff's road patrol compliment as well as security in our schools. The situation in particularly is dangerous after dark when we only have one officer assigned to a vehicle. The County is requesting two road patrol officers and one school liaison officer. The County can pay a twenty five percent match for the first three years of employment and can guarantee that we will pay the fourth year in full. Chippewa County is a major border crossing with Canada. Furthermore, with the Soo Locks in the County, security is critical to our infrastructure. 3/1/2009

3/1/2013

$

900,000

The Chippewa County Courthouse is on the National Register for Historic Sites. Originally built in the late 1800's, the Courthouse underwent its last major renovation more than twenty years ago. The building is in need of major repair including sandstone preservation, woodworking and window replacement, roof and sidewalk repairs, a backup command and control center, air conditioning and numerous security updates. The County also needs to modernize how the building is heated. Currently it is heated with an outdated boiler system. We would like the building to become "green friendly". 5/1/2009

12/31/2009

$

700,000

T O

s t s

-N

e u

q e R

b u S 02262009

Submitted Requests - Not Approved

55 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Chippewa County

Sault Ste. Marie

Project Name

Project Description

Start Date

91st District Court Security and energy efficiency Update

Currently Chippewa county is in the process of trying to obtain funding for the purchase of the City County Building and the security renovation of the 91st District Court within that building. Currently, we are co-owners with the City of Sault. Ste. Marie and they have asked us to purchase their share of the building for $750,000.00. Our District Court is in need of serious renovations. Former Judge Michael McDonald has been asking the County to address a wide variety of security concerns for quite sometime. Current Judge Elizabeth Church has noted that if something is not done the State Court Administrator's Office may have to step in. These concerns include, but are not limited to, the lack of a jury room, handicap compliance issues, visitor seating, lack of client/attorney privacy, an aging boiler system that needs to be replaced with "green" technology, and most importantly, security concerns. There are approx. 9300 persons served each year through the Court. The cost of the renovation would be approximately 2.3 million dollars. Thus making the total cost of the project 3 6/1/2009

Chippewa County

PP

O R

Funding Request

$

3,150,000

Sault Ste. Marie

Ashmun Creek Drain District

Currently in an area of economic development within the County we have a drainage problem that is creating unsafe conditions for apartment owners and business in the I75 business spur area. Over the years as business development began to increase in the area, several surrounding property owners increased the volume of water flowing into a man made ditch in the area. This has created unsanitary conditions and flooding. A drain district named "The Ashmun Creek Drain District" has been proposed for quite sometime. The cost of this project would have to be on the backs of business and property owners in the area. Due to the current economic situation, business cannot afford to address this issue. However, to get more business in the area and create jobs we must address the issue. Therefore, we respectfully ask that the Stimulus package address our need for this most important project. 6/1/2009

10/1/2009

$

750,000

All 83 Counties

State Survey and Remonumentation Fund: On behalf of all 83 County Representative to the State Survey and Remonumentation Program, I am requesting $15,000,000 be allocated to the fund from the expected economic stimulus monies. This first allocation would essentially be a replacement of monies removed from the fund in 2006. Please see the attached letter. I am asking for an additional $15,000,000 to be allocated to supplement the fund through 2010. All of these monies would be distributed using the existing State of Michigan Grant Program. They would be classified as Category II funds, and would be distributed, based on the area of the individual counties. All 83 counties would receive grants. Act 345 of 1990 is titled “State Survey and Remonumentation Act” which in part states “…..to create the state survey and remonumentation fund and to provide for its use; to coordinate and implement the monumentation and remonumentation of property controlling corners in State of Michigan Remonumentation Program this state and coordinate the establishment of geographic information systems….” If Supplemental Funding funds were made available, each County would apply for a supplemental grant to the O3/1/2009

10/1/2010

$

Upgrades to the rail crossing on M-80. 7/1/2009 Replace existing underground fuel storage tank with new above ground storage tank and pump. 6/15/2009 Replace existing underground fuel storage tank with new above ground storage tank and pump. 6/15/2009

7/1/2010

$

9/30/2009

$

25,000

9/30/2009

$

25,000

Replace failed roof system on cold starage building at Goetzville garage location 6/15/2009 Replace existing underground fuel storage tanks with new above ground storage tank and pump. 6/15/2009 Replace existing underground fuel storage tank with new above ground storage tank and pump. 6/15/2009

9/30/2009

$

20,000

9/30/2009

$

25,000

9/30/2009

$

25,000

d e tt

t i m

ub

Chippewa County EDC Kinross Charter Twp. Chippewa County Brimley, MI Superior Road Commission Township Chippewa County Road Commission Drummond Island, MI Goetzville, MI Raber Chippewa County Road Commission Township Chippewa County Goetzville, MI Raber Road Commission Township Chippewa County Pickford, MI Pickford Road Commission Township

S

02262009

M-80 Rail Crossing

Brimley facility storage tank

Drummond Island facility storage tank

Goetzville garage roof Goetzville facility storage tank Pickford facility storage tank

e u

st

q e R

s

Route (Infrastructure Only)

D VE

6/1/2010

A T

Chippewa County

Expected Completion Date

O N

Submitted Requests - Not Approved

30,000,000 N/A 396,307 M-80

56 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Chippewa County Soo Township, Pickford Road Commission Township, MI

Chippewa Nature Center

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

Start Date

Replace main garage doors at Sault and Pickford facilities

Visitor Center Expansion

The Chippewa Nature Center (CNC) Visitor Center expansion will allow CNC to increase its regional presence as a leader in environmental awareness and an innovator in the field of natural history education. This expansion will better accommodate current and future programs, create a model of green architecture and sustainable lifestyle and increase our regional presence in education and on environmental issues. 11/2/2008

East Side Adrian Loop

This project will loop an existing 8 inch dead end water main on Oakwood Road and extend it to Howell Hwy, reconnecting at Siena Heights Drive. This will improve water quality in the area as well as provide better water pressure for both domestic and fire flow uses in this area. 10/1/2009

Trenton Hills Water Main Rehabilitation

This project will involve the rehabilitation of the existing 6 inch water main. The existing water main is unlined cast iron and we have experienced numerous water quality and pressure complaints. This project would include the cleaning and lining of the existing 6 inch main to improve water quality and fire flow. 10/1/2009

Brick Arch Sewer Rehabilitation

This project will rehabilitate the original sewer collection system that runs through the downtown area. This collection area was installed in the early 1900's and runs under many downtown structures. This project will rehabilitate the brick arch sewer with cured-in-place piping to significantly extend useful life. 9/1/2009

City of Adrian

Force Main Replacement

Replacement of 10,000 LF of 18 inch sanitary sewer force main that runs from Broad St. Pump Station to the Wastewater plant. The current force mains have been in service since 1930 and have reached their useful life. This project could also help eliminate SSO's in the system due to insufficient sizing of the mains. 7/1/2009

City of Adrian

This project will be Phase III of the previous Sewer System Improvement projects aimed toward the removal of illicit storm water entering the sanitary sewer system. Eliminating Sanitary Sewer Overflows (SSO'S) resulting from intense storm events is the Citys ultimate goal. Installing a parallel sewer and an enclosed retention basin will provide addtional storage to relieve the sanitary sewer system under such storm Sewer System Improvements-Phase III-River events. Construction of this Phase of the Improvement project will significantly reduce risk of SSO's occuring in Riverside Park and direct contamination of the River Raisin. 8/1/2009 Interceptor SSO Elimination

Midland/Homer

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

Project Description

Sault and Pickford Garage doors

City of Adrian

City of Adrian

Project Name

City of Adrian

02262009

-N

e u

q e R

9/30/2009

3/1/2010

O R

P P A

Install new storm sewers to alleviate ponding issues and traffic impediments during intense storm events and remove storm water from Combined sewer. Rehabilitate existing storm sewers with sign of structural dilapidation or are undersized. Clean major collecting ditch to increase storage and convey storm water to an existing Storm Sewer Rehab.- Phase I outfall. Total Estimated Construction Cost = $1.5 Million 5/1/2009 This project will include replacing 2-4 inch undersized water mains with 8 inch to Replacing Undersized Mains improve both water quality and fire flow. 11/1/2009 The project will replace approximately 700 LF of 8 inch water main. The current main West Church Street Water Main Replacement is 4 inch and is undersized based on the demand in the area. 4/1/2009

ub

S

City of Adrian

tt i m

d e t

6/15/2009

T O

s t s

Expected Completion Date

Funding Request $

4/1/2010

$

6/1/2010

$

Westwood, Oregon 500,000 and Trenton

3/1/2010

$

750,000 Downtown Area

7/1/2010

$

Broad St. to 1,500,000 Wastewater Plant

8/1/2010

$

Riverside Park to Winter Street 6,000,000 Retention Basin

12/31/2009

$

11/1/2010

$

6/1/2009

$

West Side Adrian Loop

12/31/2009

$

2009 City Street Resurfacing Project

Mill and Resurface or Base Stabilize City streets categorized as ACT 51 streets. Projected streets include McKenzie, Division, Frank, Maplewood, Scott Ct., and a handful of others. Total Estimated Construction Cost = $1.6 Million

11/15/2009

$

Submitted Requests - Not Approved

11,000,000 N/A Oakwood Dr. to Howell to Siena 400,000 Heights

This project will loop an existing 12 inch dead end water main in the City of Adrian Industrial Park and extend it our to Sand Creek Hwy. This would improve water quality as well as provide better water presure for both domestic and fire flow uses in our Industrial Park. 6/1/2009

4/15/2009

11,000

D VE $

Route (Infrastructure Only)

Misc areas 1,500,000 throughout City City Distribution 1,000,000 System West Church 150,000 Street

Industrial Drive to 300,000 Sand Creek Hwy.

Misc areas 1,000,000 throughout City

57 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Adrian

City of Adrian

2009 Federal Aid Street Rehabilitation

Mill and Resurface approximately 8,500 feet in Length x 38 feet in Width of McKenzie Street from Burr Street to Loveland Street. Total Estimated Construction Cost = $750,000 4/15/2009

City of Adrian

City of Adrian

2009 Federal Aid Street Rehabilitation

Mill and Resurface approximately 8,200 feet in Length x 40 feet in Width of Division Street from US-223 to Church Street. Total Estimated Construction Cost = $800,000 4/15/2009

City of Adrian

City of Adrian

2009 Federal Aid Street Rehabilitation

Mill and Resurface approximately 3,000 feet in Length x 28 feet in Width of Bent Oak Ave from Siena Heights to Abbot Court. Total Estimated Construction Cost = $225,000 4/15/2009

City of Adrian

City of Adrian

2009 Non-Federal Aid Street Rehabilitation

Mill and Resurface approximately 1,300 feet in Length x 33 feet in Width of Frank Street from Division to Center. Total Estimated Construction Cost = $85,000

2009 Non-Federal Aid Street Rehabilitation

Mill and Resurface approximately 1,500 feet in Length x 33 feet in Width of Park St. from Maumee St. to Michigan Ave. Total Estimated Construction Cost = $95,000 4/15/2009

2009 Non-Federal Aid Street Rehabilitation

Mill and Resurface approximately 2,100 feet in Length x 20 feet in Width of Westwood Ave. from Maple St. to Maple St. Total Estimated Construction Cost = $90,000

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian

City of Adrian (downtown) Police Department

This is a new structure to be located next to the city library, which is located next to the future city hall. It will replace the undersized department at current city hall. It will be a 2 story structure and will be connected to the adjacent historic original Adrian Post Office for training and other police uses, along with public meeting space. 5/1/2009

City of Adrian (downtown) City Hall

Current city hall (circa 1970) houses city staff and the police department and has been determined to have insufficient space and due to code violations and obsolescence, the costs would exceed 4.5 million to renovate city hall, plus locate a new area for a police department to build a new structure. Due to the sale of a local bank, the new owner was going to vacate the old main branch (1907 building). This has been acquired by the city to re-locate city hall. Renovations are needed to transform the building to house city hall functions. 4/1/2009

t s e

City of Adrian

City of Adrian

O N

4/15/2009

u q e

City of Adrian (downtown) Chamber Annex

e t t

it

bm

City of Adrian

City of Adrian (downtown) Library renovations

City of Albion City of Albion City of Albion

City of Albion City of Albion City of Albion & Albion Township

City of Albion City of Albion

City of Albion City of Albion

City of Albion City of Albion

City of Albion City of Albion

u S

02262009

R d

Renovate City Hall Victory Park Dam Michigan Horse Park Facility Retrofit City Street Lights WWTP Generator Industrial Incubator Building Roof Replacement Water Tower Painting

This is the final building involved in the new Municipal complex. This historic building (1904), which housed the first city Post Office and which is vacant, will be renovated to be co-used by the city police department and as city commission chambers and for other city agencies and commissions. The building needs complete historic renovation, including electric, mechanical, plaster, windows, etc. 4/1/2009 Two years ago, the façade of the city library experienced a structural failure, causing this entrance to be closed for safety reasons. The project will replace the façade and add space for a teen area, a proposed coffee shop, and opens a mezzanine for seating in part to create a small business entrepreneur area. 3/1/2009 New geothermal heating/cooling system, windows, lights, drainage improvements and basement renovation 7/1/2009 Repair/retrofit dam into whitewater rapids facility 5/1/2009

Regional horse park - show facility 7/1/2009 Convert decorative City street lights in downtown to LED plus add on extra light fixture for sidewalk area 6/1/2009 Install backup generator at WWTP 6/1/2009 Replace roof on incubator building Clean and paint inside and outside of City's water towe

Submitted Requests - Not Approved

5/1/2009 5/1/2009

11/15/2009

11/15/2009

Funding Request

Route (Infrastructure Only)

McKenzie St. from 750,000 Burr to Loveland

$

D VE $

Division St. from 800,000 US-223 to Church

$

Bent Oak Ave. from Siena Heights 225,000 to Abbot Ct.

$

Frank St. from 85,000 Division to Center

$

Park St. from Maumee St. to 95,000 Michigan Ave.

11/15/2009

$

Westwood Ave. from Maple St. to 90,000 Maple St.

12/30/2009

$

2,800,000

5/1/2009

$

330,000

8/1/2009

$

750,000

10/31/2009

$

1,000,000

12/1/2009 $ 11/1/2009 $ Phases Dec 2009 Dec 2010 $

1,000,000 1,000,000

O R

PP

4/15/2009

A T

s

Expected Completion Date

11/15/2009

11/15/2009

11/15/2009

70,000,000

9/1/2009 11/1/2009

$ $

55,000 250,000

7/1/2009 8/1/2009

$ $

50,000 150,000

58 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Albion City of Albion City of Albion City of Albion City of Albion-Sheridan City of Albion Township City of Albion City of Allegan City of Allegan City of Allegan

Project Name Ismon House Renovation Sidewalk Improvement Program

Project Description Complete renovation of upper 2 floors of this historic structure Repair sidewalks in City Extend City sanitary sewer system into adjoining township to serve industrial Regional Sewer Extension Project (425 Area) development area

Start Date 5/1/2009 5/1/2009

Expected Completion Date Funding Request 11/1/2009 $ 200,000 11/1/2009 $ 1,500,000

5/1/2009

11/1/2009

4/1/2009 2009 7/1/2009

8/1/2009 2010 12/31/2009 12/10/2009

$

1,000,000

$ $ $ $

187,000 1,000 Yes 150,000 y 8,000,000

12/31/2010

$

1,945,000 NA

7/1/2009

12/31/2009

$

284,000 y

Resurfacing of State route within City of Allegan

7/1/2009

12/31/2009

$

435,000 y

The project purpose is to renovate a 35 years old water plant. Further, this project would affect in a positive way all the water customers in Allegan City and beyond.

7/1/2009

12/31/2010 7/10/2009 12/9/2009 12/9/2009

$ $ $ $

8,400,000 NA 300,000 535,000 1,000,000

12/31/2009

$

785,000

Energy Efficiency Improvements - Regent Theatre

The Regent Theatre is the main attraction to Downtown Allegan and a State recognized Award winner for Historic Preservation. The City purchased the theatre after many attempts by private and non-profits to sustain. The city has done this with the support of the city and other grant funds. The State funded a study in 2007 which identified energy efficiency improvements which could save thousands of dollars annually in operational costs by investing in the mechanical systems. With Federal Stimulus, this downtown icon can be energy efficient and provide reduced operational costs. 5/1/2009

12/31/2009

$

228,000 NA

Energy Efficiency Improvements - Griswold Auditorium

The Griswold Auditorium is the main community facility for public meetings and services. The City was donated the facility in the 1930’s, and we continue to maintain with dedication to the citizens. The State funded a study which in 2007 identified energy efficiency improvements to save thousands of dollars in operational costs by investing in the mechanical systems. With Federal Stimulus, this critical community building can be energy efficient and provide reduced operational costs. 5/1/2009

12/31/2009

$

110,000 NA

Rieger Park, City of Albion Rieger Park Swimming Beach Allegan Miner Lake City of Allegan North Main Street Reconstruction City of Allegan New Water Treatment Plant

Outside swimming pond and beach area with handi-capped facilities Miner Lake Resurfacing of State route within City of Allegan

The city purchased a hydro power plant and dam in 1997, and has been pursuing the renovation and eventually production of power to the region ever since. The structure of the hydro plant is in need of major renovations. It not only can produce power, but provides for a scenic overlook in Downtown Allegan. The hydro plant can be renovated and positioned to produce green power to the grid with the investment of $1,945,000. The cost listed not only provides for structural improvements, but flood impact reduction tools in the area (including protections for the existing water treatment facilities), such as advanced electronic communications, enhanced power reliability to the gates and other flood controls. The City has already completed multiple engineering studies and design on the structural integrity of the structure, so with federal stimulus, we can start the construction to rehabilitate the hydro plant withi four months. Once this is complete, the city will seek the permit to produce the power. But the investment would absolutely position the City to produce green power for the region. 7/1/2009

T O

N s

City of Allegan

City of Allegan

City of Allegan

City of Allegan

City of Allegan

Hydroelectric Power Plant Renovation River Street Reconstruction - Cora Street to City Limits River Street Reconstruction - M-222 to City Limits

City of Allegan City of Allegan City of Allegan City of Allegan

City of Allegan City of Allegan City of Allegan City of Allegan

Water Treatment Plant Renovation Airport Terminal Building Eastern Ave. Lift Station Water Distribution System Improvements

City of Allegan

This critical street section is the main artery for thousands of citizens. The City Engineer has reviewed the project and with federal stimulus, we can begin the project Eastern Avenue/Hooker Road Reconstruction within four months. 5/1/2009

itt

City of Allegan

City of Allegan

m b u

S

City of Allegan

City of Allegan

02262009

d e t

st

Resurfacing of State route within City of Allegan

e u

q e R

Submitted Requests - Not Approved

O R

D VE

P P A

City of Allegan

City of Allegan

Route (Infrastructure Only)

y

59 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Allegan

City of Allegan

City of Allegan

City of Allegan

City of Allegan

City of Allegan

City of Allegan

City of Allegan

Project Name

Project Description

Start Date

Expected Completion Date

Energy Efficiency Improvements - Dept. of Public Works

The Public Works Garage is the home of the critical services of the City of Allegan. The State funded a study which in 2007 identified energy efficiency improvements which could save thousands of dollars in operational costs by investing in the mechanical systems. With Federal Stimulus, this critical facility can be energy efficient and provide reduced operational costs.

Eastern Avenue Lift Station Improvements

The city has conducted an engineering study for this critical project. This particular public lift station carries waste from many properties. The lift station facility is in need of redesign, and can be started within less than two months with the federal stimulus. 4/1/2009

Second Street Bridge Renovation

The city has prepared engineering specification as is ready to bid immediately upon notice of federal stimulus. This is a non-federal bridge, but has structural needs which must be addressed. The Second Street Bridge is an Allegan Icon, and has received historic recognition at the federal level. However, the structure does not meet modern design standards, so the opportunity to receive general federal bridge money is very limited. This show piece is a critical artery to Downtown Allegan and continues to be a source of pride for the Allegan Area. 3/1/2009

JayCee Park Improvements

The city has prepared engineering bid specifications as is ready to proceed immediately upon notice of federal stimulus. This park is in Downtown Allegan, and is a gathering spot for the young and young at heart, by providing walking trails and play equipment. Plans are already prepared for improvements to the outdoor basketball courts, drives, parking facilities and the establishment of a sledding hill and a new skate board park. 3/1/2009

Hooker Road Pedestrian Walk

The city has prepared engineering specifications and is ready to bid immediately upon notice of federal stimulus. This walkway is critical to providing access to many underprivileged citizens access to shopping and other critical services on M-89. Because of the dangerous terrain and amount of individuals who utilize this route for walking, the federal stimulus program could instantly assist individuals access to work and services. Some individuals, especially during the winter months, even ride down the middle of the road in conflict with auto mobiles, so we believe it is a critical project The city has provided tax incentives to the low income housing near this project zone and believes the federal stimulus program will directly affect many individuals in a positive way. 3/1/2009

T O

5/1/2009

12/31/2009

N s

D VE $

150,000 NA

$

535,000 NA

12/31/2009

$

539,126 NA

12/31/2009

$

280,000 NA

12/31/2009

$

360,000 NA

12/31/2010 12/9/2009 12/9/2009 12/9/2009

$ $ $ $

9,500,000 NA 150,000 725,000 900,000

Fall 2009

$

O R

P P A

Funding Request

Route (Infrastructure Only)

12/31/2009

t s e

City of Allegan

City of Allegan

R d

e t t

t i m

City of Allegan City of Allegan City of Allegan City of Allegan

City of Allegan City of Allegan City of Allegan City of Allegan

Waste Water Treatment Plant Renovation North Main St. Resurfacing River St Resurfacing Eastern Ave. & Hooker Rd Resurfacing

City of Allen Park

Allen Park

Generators

02262009

b u S

u q e

Currently under construction, this project will renovate a 35 years old waste water plant. This project would also positively effect all the sanitary sewer customers in Allegan City an beyond. Further, we are installing a septic receiving station, which will provide a region site for septage, and improve environmental quality. The septage receiving portion of the project costs approximately $1,000,000 and will begin construction in the next six months. Sept. 1, 2008

Design-Build of pump station generators at sanitary/storm pump stations throughout the City.

Submitted Requests - Not Approved

Spring 2009

250,000 1500 Moran St.

60 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Allen Park

City of Allen Park

City Of Allen Park

Allen Park

Allen Park

Allen Park

Project Name

Project Description

Sanitary District One Storage Tunnel Project

Detailed plans and specifications have been prepared that includes the replacement o the existing Outer Drive Lift Station and 18-21 inch gravity sewer pipe within a new upstream pump station and force main, constructing of a 96-inch tunnel sized to meet the 1.35 MG storage need, elimination of an upstream "bottleneck" within the existing sanitary sewer, construction of approximately 900 lineal feel of new 18-inch sewer, and construction of a new outfall conduit to the Ecorse Creek for emergency wet weather flow. A project plan has been completed and submitted to the MDEQ. Construction is required in accordance with a December 21, 2005 Consent Judgment. Fall 2009

2009 Sanitary Sewer Rehabilitation

Lining of the existing sanitary sewer throughout the Kennedy Subdivision through the use of Cured-In-Place Pipe (CIPP). The quantities include approximately 2,532 linear feet of 8-inch sewer, 16,167 linear feet of 10-inch, 5,912 linear feet of 12-inch, 1,180 linear feet of 15-inch sewer and the rehabilitation of 127 sanitary structures. The construction is necessary in order to reduce infiltration into the existing system and to increase the structural integrity of an aging system. State and local agency permits are required. Preliminary specifications are complete. Spring 2009

Fire Department

Re-location of Fire Department to better serve community. Current location is in Downtown area and on parcel viable for re-development. New facility is designed by a LEED certified architect and the contractor will be a Green Certified builder. The new facility will be more energy -efficient and 21st century technology will be implemented throughout the facility. Both active and passive solar as well as geo-thermal heating and cooling will be used. These changes will reduce the operating costs for the city and the location is better to serve the residents. 5/1/2009

Allen Park

Police Department and Court Facility

d e t

P P A

12/1/2010

$

4,341,817

Re- location of Police and District Court facility. Current site of Police Department and grounds are in Film Studio development area. District Court Is a shared facility serving both Allen Park and Melvindale. New facility will allow for 21st century technology upgrades as well as creating a more energy- efficient building. The architect is LEED certified and the building contractor will be a Green Certified Builder. The new facility will reduce the maintenance costs as well as the energy costs. Both active and passive solar as well as geo-thermal heating and cooling will be used. 5/1/2009

12/1/2010

$

17,785,215

Fall 2009

$

T O

q e R

N s

st

Allen Park

2009 Catch Basin Rehabilitation Program

City of Allen Park

Allen Park

Bondie/Northway Road Reconstruction

federal economic recovery

City of Allen Park

City of Allen Park

Allen Park

Allen Park

02262009

$

I-94/Outer Drive/Enterprise 19,500,000 Drive

Kennedy 8,000,000 Subdivision

City of Allen Park

b u S

D VE $

Construction includes the replacement and/or rehabilitation of approximately sixty (60) existing storm sewer structures. The improvements are necessary in order to increase the structural integrity of the storm sewer system. Specification documents are bid ready, pending receipt of sufficient funding. Spring 2009

tt i m

O R Fall 2011

Funding Request

Route (Infrastructure Only)

Fall 2010

e u

City of Allen Park

Start Date

Expected Completion Date

$

300,000 City-Wide Bondie/Northway 1,100,000 Road

2009 Water Main Lining

Lining of existing water mains through the use of Cured-In-Place Pipe (CIPP). The existing water mains to be lined include both 6-inch and 8-inch mains. The chosen method of construction is one that minimizes impact and disruption to both residents and existing trees, roads, green belt areas, etc. Impacted hydrants and gate valves will also be replaced. The specification documents have been prepared and are bid ready, pending receipt of permits and sufficient funding. Spring 2009

Fall 2009

$

Northeast Quadrant of the 2,400,000 City

Municipal Library

Re-location of Library. New Leed Certified building constructed by Green Certified builder. Building is designed using 21st century technology and will be much more efficient than current facility. Geo-thermal heating and cooling as well as active and passive solar will be used in the building. These changes will reduce the maintenance and operating costs for the city. 5/1/2009

5/1/2010

$

4,873,575

Submitted Requests - Not Approved

61 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Allen Park

Allen Park

Project Name

Project Description

Start Date

Re-location of Municipality City Hall. Current site is part of Film studio Development area. Building is designed for LEED certification and the contractor must be a Green certified builder. Fuel - efficient geo-thermal heating and cooling as well as active and passive solar will be used. New building will allow for 21st century technology upgrades. 4/15/2009

City Hall

City of Allen Park

Allen Park

City of Allen Park

Allen Park

Film Studio Exterior Light Repair and Security Camera System

City of Allen Park City of Allen Park

Allen Park Allen Park

Retention Basin Emergency Generator Retention Basin Roof Repair

City of Allen Park

Allen Park

HVAC Air Handling Unit + Boiler Unit

Redevelopment of 104 acres for a Film Studio development that will create approximately 3000 - 5000 permanent jobs. Cost to include construction of green space, roads , storm sewers , sanitary sewers, sidewalks and water distribution system. Development will provide job opportunities for unemployed workers and provide worker training and placement in growth and emerging industry. Development to diversify the areas dependency on the automotive industry. 3/1/2009 Repair-Replace non functional site lighting improve lighting as required to eliminate vandalism. Implement security system for facility as required. Summer 2009 Repair the Emergency Generator fuel tank to meet newly established MDEQ regulations. Spring 2009 Repair-Replace aged leaking roof top on the Basin and attached facilities Spring 2009 Replace HVAC air handling unit as required per existing unit has reached life expectancy. Spring 2009

Ecorse Creek Pollution Abatement Disinfectant Facility

Electrical Services include the complete removal and replacement of eight (8) mixers in Basin's 1, 2, and 3, one (1) vacuum/pressure pump, and a full implementation of the Computer Maintenance Management System (CMMS) Spring 2009

2009 Mill and Resurfacing Program

Specifications have been prepared to Mill and Resurface approximately 17,000 linear feet of 33-foot wide road and approximately 3,600 linear feet of 66-foot road. The work is needed in order to extend the life of the affected roads. Specifications and contract documents are bid ready, pending receipt of sufficient funding. All work lies within City jurisdiction.

City of Allen Park

City of Allen Park

Allen Park

Allen Park

City of Allen Park

Allen Park

2009 Street Sectioning Program

City of Allen Park

Allen Park

Flushing System Replace-Repair

City of Alma

d e tt

t i m

ub

Alma

Expected Completion Date

2010 Sanitary Sewer Replacement

A T

e u

st

s

4/15/2010

O N

D VE $

6,765,120

10/15/2009

$

Southfield Road & Enterprise Drive Acreage. See 8,200,000 Attach Survey

Winter 2009

$

25,000 1500 Moran St.

Summer 2009 Summer 2009

$ $

15,000 1500 Moran St. 100,000 1500 Moran St.

Summer 2009

$

220,000 1500 Moran St.

Fall 2009

$

350,000 1500 Moran St.

O R

PP

Funding Request

Route (Infrastructure Only)

$

2,500,000 City-Wide

$

2,600,000 City-Wide

Concrete panel replacement and joint repair work is needed within numerous roads throughout the entire City. Construction includes the replacement of cracked and broken panels and failing joints. Panel and joint replacement at this time will significantly extend the life of the road. Specifications and contract documents are bid ready, pending receipt of sufficient funding. Replace-Repair as needed non functional flushing system to improve overall functionality of the facility. Fall 2009

Spring 2010

$

170,000 1500 Moran St.

Replacement of sanitary sewer main adjacent to the east side of the Pine River from the north side of Superior Street to the south side of the Mid-Michigan RR tracks. The existing sanitary sewer starts as a twenty inch diameter pipe and flows into a fifteen inch pipe and finally into a 30 inch sewer main. This project would replace the existing fifteen inch pipe with a continuous 20 inch sanitary sewer to the existing 30 inch. The project would reduce sewer backup and overflows during high flow periods. Approximately 900 linear feet of sanitary sewer would be replaced and two bores would be required to cross the RR tracks and the state trunk line of B.R. 127. 6/1/2009

10/1/2009

$

160,000 MDEQ

q e R

S 02262009

Submitted Requests - Not Approved

62 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

City of Alma

Alma

Alma

Project Name

Project Description

Start Date

Expected Completion Date

2010 Capital Improvement Project

Reconstruction of Golfside Drive from Superior Street south to Riverview Drive (0.37 miles) and Pineview Court from Riverview Drive southward (0.06 miles). Both streets are city local streets with a Paser rating of 4 for Golfside Drive and a Paser rating of 3 for Pineview Court. Reconstruction on Pineview Court would include replacement of concrete curb and gutters as required, improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Reconstruction on Riverview Drive would include improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in March of 2009. 6/1/2009

S. Lincoln Ave Reconstruction

Reconstruction of S. Lincoln Avenue from the south City Limits to Marshall Street (0.50 miles), which is the only access to the City from the southward direction. The existing street is a major city street with an ADT of 5,000; that is presently two lanes and has a Paser rating of 2. Reconstruction would include installation of concrete curb and gutters, improvements to the storm sewer system, replacement of the street substructure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in April of 2009. 6/15/2009

O R

D VE $

345,000 MDOT

9/15/2009

$

809,000 MDOT

W. Superior Street Reconstruction

Reconstruction of W. Superior Street from West City Limits to Charles Avenue (0.53 miles), which is the only access to the City from the westward direction. The existing street is a major city street with an ADT of 10,000; that is presently two lanes and has a Paser rating of 5. Reconstruction would include concrete curb and gutters, improvement to the storm sewer system, replacement of the street sub-structure, new HMA surfaces and increasing street width at the intersections with two other major streets (Luce Road and Charles Avenue) to three lanes for a center turn lane to increase safety. Street width would also be increase the entire length of the project for the inclusion of two “non-motorized” bicycle lanes”. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in April of 2009. 6/15/2009

9/15/2009

$

860,000 MDOT

e t tt

The existing two span bridge structure located on Bridge Avenue crossing the Pine River is presently listed on the MDOT critical bridge list for repairs and reconstruction. Deterioration of the structure has resulted in reduced load limits being imposed and the FSR reduced to its present rating of 38.1.The bridge structure requires replacement of the deck, superstructure, and the replacement or restoration of the mid-span piers of the sub-structure. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed May 2009. 6/15/2009

12/15/2009

$

859,000 MDOT

Runway 18/36 Rehab Project

The rehab of the 3200’ north/south runway 18/36 and Taxiway B is currently under design and would be ready to go in the time frame specified. The project is part of the Gratiot Community Airport’s Five Year Development Plan. The project involves mill and resurface of the runway and taxiway, crack repair and grooving the runway surface. The Gratiot Community Airport Commission in the last five years has focused on raising revenues and improving current facilities and not construction any new facilities. 6/15/2009

9/15/2009

$

495,000 MDOT

Water Plant Warehouse Project

Construction of a 40x50 warehouse for the water treatment plant. Warehouse to be used for equipment storage and storage of water distribution repair components such as water valves, and pipe. 8/1/2009

12/31/2009

$

T O

9/1/2009

Funding Request

Route (Infrastructure Only)

P P A

N s

t s e

City of Alma

City of Alma

Alma

R d

i m

Alma

Bridge Structure at Pine River

ub

S City of Alma

City of Alma

Arcada Twp

Alma

02262009

u q e

Submitted Requests - Not Approved

90,000

63 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

Alma

City of Alma

Alma

City of Alma

Alma

Project Name

Project Description

Start Date

Expected Completion Date

Alterations to the existing Municipal Building that was constructed in 1976 to reduce energy consumption. Retrofit insulation into walls and ceiling areas of the existing structure. Replace existing windows, and install weather stripping; upgrade existing Municipal Bldg Energy Improvements Project mechanical equipment and insulate the existing ductwork.

7/1/2009

9/1/2009

Funding Request

D VE $

240,000

Route (Infrastructure Only)

Pine Avenue Roundabout

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

10/1/2009

$

500,000 MDOT

Sanitary Infiltration & Inflow Project

Project to reduce the infiltration and inflow of ground water and storm water into the sanitary sewer system. Line the interior of existing sanitary sewer mains in the area of Lift Station #8 and repair sanitary sewer manholes to prevent infiltration. Line approximately 10,000 linear feet of sanitary sewer and reconstruction of twenty sanitary manholes. 7/1/2009

9/1/2009

$

500,000

The Alma Riverfront Brownfield Project is the final phase of removing the remaining contaminated soil in the Alma Downtown Riverfront Redevelopment Project Area. The goal of this long-term project is to reclaim the Mill Pond Riverfront from its history of industrial usage, to create a mixed used development for commercial, retail, recreation and residential living. This development would be like no other in the Mid Michigan area. With funding from an SEP Project, CMI Grant, DEQ Loan, EPA Cleanup Grant and Local Funding the City of Alma as accomplished: The environmental study of the riverfront area, Community Master Planning and Concept drawings for the riverfront, purchase of property, demolition of the existing structures and removal of contaminated soils. A major component of the project was to move outdated Alma Iron and Metal facility (Metal Recycler) off the riverfront and relocating them to a more appropriate area on the former Total Refinery property (this site also considered a brownfield). This piece of the project allowed Alma Iron and Metal to build a brand new facility with today’s current environmental standards and expanded 6/1/2009

10/31/2009

$

270,000 MDEQ

11/15/2009

$ $

680,000 MDOT 880,000

T O

O R

P P A

N s

t s e

u q e

R d

City of Alma

Alma

i m

b u S City of Alma City of Alpena

Alma Alpena, MI

02262009

e t tt

Alma Riverfront Brownfield Project

Downtown Street Lighting Project

This summer working with MDOT the City of Alma completed the first phase of a downtown streetscape. Part of the streetscape included replacement of 36 of the thirty year old mercury vapor lights with new historically significant LED lights. The new LED lights use only 10% of the power the current mercury vapor lights use. Also the light fixture itself is estimated to last 15 years before it needs replacement, saving on maintenance costs. The style of the new lights has also been approved by the Michigan Historic Preservation Office as significant to the downtown of Alma. There is great energy savings potential in replacing the remaining 141 mercury vapor lights owned by the City of Alma in the Downtown District, with the new LED lights. The engineering for this project could be completed by April 15, 2009, and installation by September 30, 2009. 6/1/2009 Long Rapids Road Resurfacing

Submitted Requests - Not Approved

64 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena

City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena

Traffic Signal Controller Replacement 4 locations which have not been upgraded Cavanaugh Street Resurfacing M-32, Washington Ave to Eighth Ave Ninth Avenue Water Tower Piping and Pump House Circuit Breaker Upgrade and Rebuild Water Recycling Plan Water Production Plant Sanitary Discharge Replacement Railroad Crossing Improvements Grant St, Third & Fifth Aves, Franklin St Third Avenue Resurfacing Garden St. to Bagley St Lift Station Telemetry - 11 Stations throughout the system Merchant Street Reconstruction Fletcher St. to Oldfield St Miller Street resurfacing N. Second Ave to Beech St. Water Recycling Plant SCADA System Municipal Parking Lot Reconstruction Lockwood St. and M-32 Ford Avenue Resurfacing Lafarge Railroad crossing to City Jurisdiction Methane Gas Storage Water Recycling Plant Wessel Road Truck Route Resurfacing Citywide Resurfacing Targeting 40 Blocks Throughout the System Wastewater Treatment Plants Improvements: Phase III Ninth Avenue Water Tower Coating Energy Efficiency Upgrades Per Honeywell Study City Ha Ripley Blvd. Reconstruction Hobbs/Grant Intersection Imp. Hobbs Dr. Improvements: 34d Ave. to Grant St. Energy Efficiency Upgrades Per Honeywell Study Street Light System

City of Alpena

City of Alpena

East Commerce Dr. Infrastructure Sewer & Water (Hueber St. to Wessel Rd.)

City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena

City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena City of Alpena

Energy Efficiency Upgrades Per Honeywell Study Water System Meter Replacement River St. Improvements: 3rd Ave. to Ninth Ave. Water Street Riverfront Development Project Downtown riverfront Development Project Mich-e-ke-wis Park/Starlite Beach Imp. Infrastructure Replacement

T O

d e tt

O R

P P A

N s

st

e u

q e R

Expected Completion Date

Funding Request $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

14,000 30,000 35,000 50,000 75,000 80,000 106,200 125,000 140,000 142,500 150,000 175,000 200,000 250,000 260,000 280,000 500,000 615,000 750,000 850,000 900,000 1,000,000 1,250,000

$

1,500,000

$ $ $ $ $ $

1,750,000 1,800,000 2,500,000 3,000,000 4,000,000 9,475,825

D VE

Install a 11 kW photovoltaic (PV) system, a 8 kW PV system and one domestic hot water system at City fire stations to reduce energy costs and greenhouse gas emissions. Replacement of failing portion of existing sanitary sewer system

6/1/2009 4/1/2009

10/31/2009 Fall 2009

$ $

200,000 2,050,000

7/1/2009 2/1/2009

12/31/2010 3/1/2010

$ $

3,800,000 1,025,000

City of Ann Arbor City of Ann Arbor

Ann Arbor Ann Arbor

Fire Station Solar Energy Installation Southside Interceptor Rehabilitation

City of Ann Arbor City of Ann Arbor

Ann Arbor Ann Arbor

Streetlight LED Conversion Northside Sanitary Submain

Replace 5,500 mercury vapor and high pressure sodium streetlights with new LED fixtures to reduce energy use, greenhouse gas emissions, and maintenance costs. Replacement of failing portion of existing sanitary sewer system

Footing Drain Disconnection Curb Drains

Installation of curb drains to accept flow from new sump pump discharge lines installed to remove footing drain connections from the sanitary sewer system, thus eliminating wet weather and groundwater flow from the santiary system and ultimately the wastewater treament plant 6/1/2009

5/1/2010

$

3,000,000

Sanitary System Manhole Rehabilitation and Replacement Project

Rehabilitiation and/or replacement of failing sanitary sewer manholes which no longer allow access for maintenance and operation of the City's sanitary collection system 7/1/2009

11/1/2010

$

250,000

it

m b u

City of Ann Arbor

Ann Arbor

City of Ann Arbor

Ann Arbor

City of Ann Arbor

Ann Arbor

S Ashley, S Main & Londonderry Water Main Reconstruction of approximately 1000 feet of 8 and 12 inch water main, 340 feet of Projects directionally drilled 12 inch HDPE water main, and 400 feet of concrete storm drain.

5/15/2009

9/1/2009

$

500,000

City of Ann Arbor

Ann Arbor

Stadium Iroquois Water Main Replacement Project

5/20/2009

8/31/2009

$

550,000

02262009

S

Replace approximately 3,350 lf of existing 4" and 6" water main with new 8" water main in order to improve water quality and increase fire protection coverage.

Submitted Requests - Not Approved

Route (Infrastructure Only)

65 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Ann Arbor

Ann Arbor

City of Ann Arbor

Ann Arbor

Replace approximately 4,500 lf of existing 4" and 6" water main with new 8' water main in order to reduce water main breaks, improve water quality by providing looping and increase fire protection coverage on Glendaloch, Loyola, Elmcrest, Anderson, Clair 5/1/2009 GLEACH Water Main Replacement Project Washtenaw Avenue Water Main Replacement Replace approximately 3,000 lf of existing 12" ductile iron pipe that has corroded to Project the point of failure with a new 12" water main. 6/1/2009

City of Ann Arbor

Ann Arbor

Steere Farm Raw Water Main Replacement Project

Replace approximately 4,200 lf of existing 20" ductile iron pipe that has corroded to the point of failure with a 30" water main that will meet future capacity needs.

700,000

$

1,100,000

$

1,750,000

July, 2011

$

54,000,000

Fall 2009

$

250,000

8/15/2009

$

500,000

12/1/2009

$

600,000

4/1/2009 7/1/2009

Fall 2009 8/1/2009

$ $

150,000 150,000

2/1/2009

8/1/2009

$

230,000

2/1/2009

8/1/2009

$

250,000

8/1/2009

9/15/2009

$

80,000

7/1/2009

7/1/2010

$

2,000,000

7/1/2009

12/1/2010

$

3,500,000

8/1/2009

10/15/2009

$

125,000

8/1/2009

10/15/2009

$

250,000

8/1/2009 8/1/2009 8/1/2009

10/15/2009 10/15/2009 10/15/2009

$ $ $

250,000 400,000 550,000

5/1/2009

Ann Arbor

City of Ann Arbor

Ann Arbor

Residuals Handling Improvements Project Oakwood & Edgewood Storm Sewer Replacement

City of Ann Arbor

Ann Arbor

Plymouth Road Water Main Project

City of Ann Arbor

Ann Arbor

Sludge Pond Improvements

Replacement of failing portion of existing storm sewer system 4/1/2009 Replace approximately 1200 LF of 20-inch water main and approximately 350 feet of 12-inch water main which has reached the end of it's life 6/1/2009 Replace concrete outlet structure at lime solids residual pond. Existing structure is heavily deteriorated and failing. 7/1/2009

City of Ann Arbor City of Ann Arbor

Ann Arbor Ann Arbor

Parkwood/Fernwood Sanitary Pipe Bursting Packard Road Water Main Bore

Replacement of failing portion of existing sanitary sewer system Bore new water main to connect Pittsfield Village system to city system

City of Ann Arbor

Ann Arbor

City of Ann Arbor

Ann Arbor

Parkwood/Fernwood Crosslots Sanitary Lining Repair of failing portion of existing sanitary sewer system This project includes the replacement of approximately 313 feet of 10-inch sanitary Yost Sanitary Sewer sewer by pipe bursting with new 12-inch HDPE pipe.

e u

Detroit Street Water Main Replacement First Street Sanitary Replacement Pauline Sanitary Replacement Arbor Oaks Subdivision Water Main Replacement

6/1/2009

Fall 2010

$

1,500,000

Facilities Renovations Project

The Facilities Renovations Project consists of upgrading, rehabilitating and/or replacing the aging and deteriorating wastewater treatment facilities at the Ann Arbor WWTP. The WWTP consists of an older West Plant (constructed in the 1930’s) and a newer East Plant (constructed in the late 1970’s). Renovations include process, energy and efficiency improvements. Additionally, the plant wide electrical grid system will be replaced. This project is critical to maintaining treatment and solids processing capacity at the WWTP. Fall 2009

Fall 2014

$

94,000,000

Ann Arbor

Harvard Drain Improvements

City of Ann Arbor

Ann Arbor

Water System Security Improvements

City of Ann Arbor

Ann Arbor

Lime Handling Improvements

City of Ann Arbor

Ann Arbor

City of Ann Arbor

Ann Arbor

North State Street Water Main Replacement McKinley Avenue/White Street/Arch Street Storm Vault

City of Ann Arbor City of Ann Arbor City of Ann Arbor

Ann Arbor Ann Arbor Ann Arbor

City of Ann Arbor

Ann Arbor

City of Ann Arbor

Ann Arbor

02262009

10/1/2009

D VE

Installation of a drop structure to reduce outlet velocities to minimize erosion in the intermittent stream within the Nichols Arboretum. This project coordinates with steppool/native plantings to help restore the stream geomorphology. Upgrade water system security at Water Treatment Plant and remote facilities to implement Vulnerability Assessment recommendations. Replace again lime softening system infrastructure. Modify lime storage bins to eliminate lime slides which have resulted in staff injuries. Replace existing, aged, undersized water main before brick pavement is reconstructed Repair of failing portions of storm vault structure that are to remain in service, and permanent abandoment of portions that are no longer in use. Replace existing, aged, undersized water main before brick pavement is reconstructed Replacement of failing portion of existing sanitary sewer system Replacement of failing portion of existing sanitary sewer system Replacement of failing portion of existing water main system within the Arbor Oaks Subdivision, east of Stone School Road, north of Ellsworth

City of Ann Arbor

m b u

eq

R d

e t t

it

S

-N

8/15/2009

O R

P P A

City of Ann Arbor

T O

9/30/2009

Funding Request

$

The Residuals Handling Improvements Project replaces the worn and inefficient residual solids processing equipment and renovates the existing structure housing the process equipment at the Ann Arbor WWTP. Additional items such as odor management and treatment are also being addressed as part of this project. This project is critical to maintaining treatment and solids processing capacity at the WWTP. 2/1/2009

s t s

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

66 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Ann Arbor

City of Ann Arbor

Vision 2020: Sustainable Design Standards

City of Ann Arbor

City of Ann Arbor

Wheeler Center Wind Energy Installation

This project is a comprehensive assessment and rewrite of Chapter 55: Zoning and Chapter 57: Subdivision and Land Use Control of Ann Arbor City Code, as well as the integration of related areas of code such as streets, parking, signs, and landscape and screening. The current code is cumbersome, piecemeal, contains conflicting language, and is inefficient for residents, developers, and city staff to use. A key goal of this project is to insure that the City’s land use regulations are user friendly and simpler in format in order to streamline and increase the efficiency of the site plan review process. Funding will we used to hire consultants to facilitate the process. The new code will be based on sustainability principles that the current code lacks. The completed code will embrace the community’s character, protect the local environment, promote housing affordability and choices, promote sustainable development practices, enable the expansion of existing businesses, and promote new business and employment growth. 7/9/2009 Install a 50 kW wind generator at City maintenance garage to reduce energy costs and greenhouse gas emissions. 8/9/2009

Westover/ Ferry Neighborhood

The scope of this project is to install roads, curbs, gutters, and water infrastructure, and to address drainage problems for the Westover-Ferry Neighborhood, a neighborhood consisting of 10 Habitat homes, serving people at 50% average median income or less 8/9/2009

Vision 2020: Creating Vital Places

City of Ann Arbor

City of Ann Arbor

310,000

12/9/2009

$

300,000

11/10/2009

$

350,000

This project will update the land use element of Ann Arbor’s master plan and include public outreach, design guidelines, and updated land use recommendations. This effort will include the hiring of a consultant to facilitate public outreach, develop design guidelines, and assist in making sustainable land use recommendations. The effort will impact economic development, affordable housing and sustainability in the following manner: Economic Development – encourage economic development along major transportation corridors, and higher density, mixed-use development in areas that currently have low intensity land uses; Affordable Housing – creation of additional affordable housing opportunities along commercial corridors. Mixed-use development that allows residential use above retail uses significantly expands new housing opportunities; and Sustainability – allowing land and infrastructure to be used more efficiently, support the existing mass transit system with additional densities, ensure the construction of new storm water detention systems, and encourage non-motorized access through higher density, mixed-use development. 7/9/2009

7/11/2009

$

435,000

This City owned 2.46 acre parcel served as a County Road Commission service yard for many years, and later as a municipal maintenance yard. There is an unoccupied, two-story brick industrial building built in 1907, which lies in a historic district (which prevents demolishing the building). The site is in the floodplain and floodway of Allen Creek, and abuts the Ann Arbor Railroad track on the east, and residential uses on the south and west. Soil contamination from leaking underground storage tanks on the site has been remediated and the tanks removed. Contaminant concentrations are significantly reduced, but levels are not below residential clean-up standards and the site has not reached closure. An ongoing contaminant source may be off-site and additional investigation and possible remediation may be needed for the site to be reused. The City of Ann Arbor is a member of the Washtenaw County Brownfield Redevelopment Authority and is a core community. The City proposes to remediate known contamination on the site and identify additional sources of contaminants. 7/9/2009 Replacement of failing portion of existing sanitary sewer system 2/9/2009

1/11/2009 3/10/2009

$ $

580,000 1,025,000

A T

b u S City of Ann Arbor City of Ann Arbor

02262009

u q e

R d

e t tt

i m

City of Ann Arbor City of Ann Arbor

O N

Brownfield Remediation: 415 W Washington Northside Sanitary Submain

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

t s e

City of Ann Arbor

PP

O R

Funding Request

7/11/2009

s

City of Ann Arbor

Expected Completion Date

67 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ann Arbor

City of Ann Arbor

Project Name

Project Description

Start Date

West Park Storm Water Issues

West Park is located at the confluence of two branches of the Allen Creek. The park has suffered increasing flooding problems due to the increased development surrounding the park. This project will address stormwater issues by creating a series of bio-swales and naturalized ponds that follow the general alignment of the creek to capture surface water and improve water quality. The project will include removal of the impermiable surfacing from the floodway by relocating pathways, a game court, parking lot and drive. The project will also include environmental interpretation and demonstration of sustainable principals while improving the usability of the park. Other features to be included are seating for a public bandshell which has free concerts each summer, a community Project Grow garden, a public restroom, access and visibility improvements, repair of crumbling retaining walls, removal of invasive species, and installation of native plantings. The location of the park near the downtown makes it espciallyappealing for individuals who need a respite from the hard surfaces and lack of green space. 8/9/2009

1,500,000

5/10/2009

$

3,000,000

12/10/2009

$

3,800,000

9/9/2009

$

80,000

10/9/2009

$

125,000

8/9/2009

10/9/2009

$

150,000

8/9/2009

10/9/2009

$

250,000

8/9/2009 8/9/2009

10/9/2009 10/9/2009

$ $

250,000 400,000

11/9/2009 10/9/2009

$ $

450,000 550,000

Fall 2010

$

1,500,000

11/10/2009

$

2,000,000

7/10/2009

$

2,000,000

12/10/2009

$

3,500,000

Footing Drain Disconnection Curb Drains

City of Ann Arbor

City of Ann Arbor

Streetlight LED Conversion

Replace 5,500 mercury vapor and high pressure sodium streetlights with new LED fixtures to reduce energy use, greenhouse gas emissions, and maintenance costs.

City of Ann Arbor

Harvard Drain Improvements

City of Ann Arbor

City of Ann Arbor

North State Street Water Main Replacement

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

Springbrook Street McKinley Avenue/White Street/Arch Street Storm Vault

City of Ann Arbor City of Ann Arbor

City of Ann Arbor City of Ann Arbor

Detroit Street Water Main Replacement First Street Sanitary Replacement

d e tt

t i m

ub

City of Ann Arbor City of Ann Arbor

City of Ann Arbor City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

Sound Barrier

City of Ann Arbor

City of Ann Arbor

Water System Security Improvements

City of Ann Arbor

City of Ann Arbor

Lime Handling Improvements

S

02262009

Bandemer Park Vehicle Bridge Pauline Sanitary Replacement Arbor Oaks Subdivision Water Main Replacement

7/9/2009

Installation of a drop structure to reduce outlet velocities to minimize erosion in the intermittent stream within the Nichols Arboretum. This project coordinates with steppool/native plantings to help restore the stream geomorphology. 8/9/2009 Replace existing, aged, undersized water main before brick pavement is reconstructed 8/9/2009

s t s

e u

The scope of this project is to install sewer connections to enable affordable housing to be built for households at 80% average median income or less. Repair of failing portions of storm vault structure that are to remain in service, and permanent abandoment of portions that are no longer in use. Replace existing, aged, undersized water main before brick pavement is reconstructed Replacement of failing portion of existing sanitary sewer system

q e R

The Bandemer Park bridge over the Huron River is the primary access point to Bandemer Park. With the threat of the only other access to the park being cut off because of safety issues, this bridge is crucial to keeping the park open. The park contains numerous amenities, including a disc golf course, a dirt bike jump course, a bicycle path, and the center for rowing for the university, the high schools and the community rowing club. The bridge is in need of replacement as the structural steel has deteriorated to the point where it is not cost effective to repair the structure. 8/9/2009 Replacement of failing portion of existing sanitary sewer system 8/9/2009 Replacement of failing portion of existing water main system within the Arbor Oaks Subdivision, east of Stone School Road, north of Ellsworth 6/9/2009 The scope of this project is to build a sound barrier along I-94 on Arbor Oaks' northern boundary. Arbor Oaks is a low to moderate income neighborhood. 8/9/2009 Upgrade water system security at Water Treatment Plant and remote facilities to implement Vulnerability Assessment recommendations. 7/9/2009 Replace again lime softening system infrastructure. Modify lime storage bins to eliminate lime slides which have resulted in staff injuries. 7/9/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

City of Ann Arbor

-N

Funding Request

10/9/2009

City of Ann Arbor

T O

O R

P P A

Installation of curb drains to accept flow from new sump pump discharge lines installed to remove footing drain connections from the sanitary sewer system, thus eliminating wet weather and groundwater flow from the santiary system and ultimately the wastewater treament plant 6/9/2009

City of Ann Arbor

Expected Completion Date

68 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Ann Arbor

City of Ann Arbor

Facilities Renovations Project

City of Ann Arbor

Pittsfield Twp

Wheeler Center Wind Energy Installation

The Facilities Renovations Project consists of upgrading, rehabilitating and/or replacing the aging and deteriorating wastewater treatment facilities at the Ann Arbor WWTP. The WWTP consists of an older West Plant (constructed in the 1930’s) and a newer East Plant (constructed in the late 1970’s). Renovations include process, energy and efficiency improvements. Additionally, the plant wide electrical grid system will be replaced. This project is critical to maintaining treatment and solids processing capacity at the WWTP. Fall 2009 Install a 50 kW wind generator at City maintenance garage to reduce energy costs and greenhouse gas emissions. 8/1/2009

6/9/2009

Fall 2014

Funding Request

D VE $

94,000,000

$

300,000

10/9/2009

$

200,000

O R 12/31/2009

City of Ann Arbor

City of Ann Arbor

Fire Station Solar Energy Installation

Install a 11 kW photovoltaic (PV) system, a 8 kW PV system and one domestic hot water system at City fire stations to reduce energy costs and greenhouse gas emissions.

City of Ann Arbor

City of Ann Arbor

Arbor Oaks

The scope of this project is to address drainage issues throughout Arbor Oaks neighborhood, a low to moderate income neighborhood of 250 homes.

7/9/2009

10/9/2009

$

300,000

Public Housing Window Replacement at Green Baxter Court Apartments

The scope of this project is to replace aging windows at three public housing sites, totalling 84 units. This result of this project will be increased energy efficiency as a result of the weatherization. The three Ann Arbor sites are Green Baxter Court (24 units located at 1701-1747 Green Road); Hikone (30 units located at 2702-2760 Hikone Drive); and Maple Meadows (30 units located at 800-890 South Maple Road). 7/9/2009

10/9/2009

$

420,000

Veterans Memorial Park Energy Efficiencies

Veterans Ice Arena is an 40-year-old facility in need of renovations and upgrades to be more energy efficient and better serve the public. The energy consumed can be greatly reduced with energy efficient infrastructure improvements, including replacing lighting, upgrading the dehumidification system and installing ceiling insulation in the arena. Additionally, a fire suppression system must be installed to comply with safety regulations, and locker rooms are being reconfigured to better serve ice hockey teams and other skaters. 8/9/2009

9/9/2009

$

550,000

The scope of this project is to install Energy Efficiency retrofitting for 39 units of affordable housing for households with income of 50% average median income or les, as part of a complete rehabilitation of the buildings 7/9/2009

10/9/2009

$

600,000

The scope of this project is to install Energy Efficiency retrofitting for 142 units of lowincome housing for seniors, with 60% average median income or less. 6/9/2009

10/9/2009

$

710,000

The scope of this project is to install Energy Efficiency retrofitting for 202 units of lowincome housing for seniors over age 62 or disabled households, with 50% average median income or less. 6/9/2009

10/9/2009

$

1,000,000

The scope of this project is to install Energy Efficiency retrofitting for 129 units of affordable housing for households with income of 80% average median income or less, as part of a complete rehabilitation of the buildings Replacement of failing portion of existing sanitary sewer system

10/9/2009 Fall 2009

$ $

1,600,000 2,050,000

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

Stimson Apartments

City of Ann Arbor

City of Ann Arbor

Lurie Terrace

City of Ann Arbor

City of Ann Arbor City of Ann Arbor

City of Ann Arbor

City of Ann Arbor City of Ann Arbor

02262009

tt i m

Cranbrook Tower

d e t

Pinelake Cooperative Southside Interceptor Rehabilitation

b u S

T O

s t s

P P A

-N

e u

q e R

Submitted Requests - Not Approved

6/9/2009 4/9/2009

Route (Infrastructure Only)

69 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ann Arbor

City of Ann Arbor

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Achieving Energy Efficiency in Historic Buildings

This project proposes to produce a four-page brochure on ways to conserve energy and make buildings more comfortable in cold and hot weather while respecting historic structures’ character and materials. Residents and building owners in historic districts regularly seek advice on how to make structures more energy efficient while still complying with historic district regulations. Though written with historic districts as the audience, the information would apply to any older building. Possible brochure topics include weatherproofing wood windows and doors, new kinds of insulation that can be installed with minimal harm to interior or exterior walls, the value of energy audits, etc. as well as the role of preservation in sustainable communities and its environmental and economic benefits. There will also be an address for a city web page that links to related resources specific to historic structures, and also general energy efficiency As soon as information that could apply to any structure. The brochure is targeted to serve funding is owners and occupants of the 1,800+ properties in historic districts in the City of Ann A available

60 days after start

$

2,423

11/10/2009

$

275,000

P P A

O R

D VE

City of Ann Arbor

City of Ann Arbor

Pittsfield Annexations

The scope of this project is to install water and sewer connections for properties being annexed from Pittsfield Township to Ann Arbor, an area that includes a low to moderate income neighborhood. 7/9/2009

City of Ann Arbor

City of Ann Arbor

Courthouse Square

The scope of this project is to install Energy Efficiency retrofitting for 114 units of lowincome LIHTC project for seniors, with 60% average median income or less. 5/9/2009

8/9/2009

$

570,000

Burton Commons

The scope of this project is to create public infrastructure, including road pavement, gutters, sewers, water, and a traffic light, to support the construction of 120 units of affordable rental housing serving households with 50% average median income or less.

6/9/2009

12/10/2009

$

1,250,000

Parkhurst

The scope of this project is to install Energy Efficiency retrofitting for 43 units of affordable housing for households with income of 50% average median income or less, as part of a complete rehabilitation of the building.

4/9/2009

7/9/2009

$

1,400,000

Ann Arbor Municipal Center Expansion/ Rehabilitation

The scope of this project is four-fold: first, to construct a 4-floor addition to the Ann Arbor Municipal Center for a new Police headquarters, District Courthouse, and joint City/County computer center; second, to renovate the existing City Hall (1) replacing the energy-wasting exterior with a high-efficiency wall, (2) expanding accessibility for disabled persons, (3) upgrading technology, and (4) installing energy-efficient mechanical systems; third, to construct a new public meeting space for City Council and citizens committees; and fourth, to construct a new public plaza with an underground storm water detention system. 3/9/2009

8/11/2009

$

65,000,000

The scope of this project is to repair the foundations and install foundation drain tiles on five, public housing buildings. These buildings experience flooding during heavy rainfall, causing damage to personal property and creating a health issue. These single unit buildings are located at North Maple Estates (731-739 North Maple Road). Summer 2009

Fall 2009

$

120,000

Replacement of failing portion of existing sanitary sewer system Bore new water main to connect Pittsfield Village system to city system

4/9/2009 7/9/2009

Fall 2009 8/9/2009

$ $

150,000 150,000

2/9/2009

8/9/2009

$

230,000

4/9/2009

Fall 2009

$

250,000

2/9/2009

8/9/2009

$

250,000

6/9/2009

8/9/2009

$

500,000

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

T O

N s

t s e

Route (Infrastructure Only)

u q e

City of Ann Arbor

R d

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor City of Ann Arbor

City of Ann Arbor City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

Public Housing Foundation Repairs at North Maple Road

ub

S

02262009

i m

e t tt

Parkwood/Fernwood Sanitary Pipe Bursting Packard Road Water Main Bore

Parkwood/Fernwood Crosslots Sanitary Lining Repair of failing portion of existing sanitary sewer system Oakwood & Edgewood Storm Sewer Replacement Replacement of failing portion of existing storm sewer system This project includes the replacement of approximately 313 feet of 10-inch sanitary Yost Sanitary Sewer sewer by pipe bursting with new 12-inch HDPE pipe. Replace approximately 1200 LF of 20-inch water main and approximately 350 feet of Plymouth Road Water Main Project 12-inch water main which has reached the end of it's life

Submitted Requests - Not Approved

70 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sludge Pond Improvements

Project Description Replace concrete outlet structure at lime solids residual pond. Existing structure is heavily deteriorated and failing.

Public Housing Draining Tile Installation on South Maple Road

The scope of this project is to install draining tiles to connect to the storm drain that runs adjacent to this public housing property. Poor drainage on this property causes basement flooding and poses a threat to resident health. The five townhouse style units are located at 860-870 South Maple Road. Spring 2009

City of Ann Arbor

Public Housing Roof Replacement at South Maple and North Maple Roads

The scope of this project is roof replacement or repair on sixteen, public housing buildings. These aging roofs are a constant threat to leak, causing personal property damage and creating fire hazards for residents. Four buildings (20 units total) at Maple Meadows, located at 800-850 South Maple Road, need shingle replacement. Twelve buildings (12 units total) at North Maple Estates, located at 701-739 North Maple Road, need full roof replacement, including gutters and vents. 4/9/2009

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

Start Date 7/9/2009

12/9/2009

Funding Request $

D VE

50,000

6/9/2009

$

106,000

City of Ann Arbor

The scope of this project is to replace aging fire/smoke monitoring alarm systems at Public Housing Fire/Smoke Monitoring System two, high-rise, public housing buildings. The current systems are between 30 and 40- 30 days after Replacement at Maple meadows and North years-old. The two, Ann Arbor sites are Miller Manor (located at 727 Miller Avenue) funds are Maple Estates Baker Commons (located at 106 Packard Road). disbursed

60 days after construction begins

$

120,000

City of Ann Arbor

City of Ann Arbor

Sanitary System Manhole Rehabilitation and Replacement Project

11/10/2009

$

250,000

City of Ann Arbor

City of Ann Arbor

S Ashley, S Main & Londonderry Water Main Reconstruction of approximately 1000 feet of 8 and 12 inch water main, 340 feet of Projects directionally drilled 12 inch HDPE water main, and 400 feet of concrete storm drain.

5/9/2009

9/9/2009

$

500,000

City of Ann Arbor

City of Ann Arbor

Stadium Iroquois Water Main Replacement Project

5/9/2009

8/9/2009

$

550,000

A T

O N

t s e

Replace approximately 3,350 lf of existing 4" and 6" water main with new 8" water main in order to improve water quality and increase fire protection coverage.

u q e

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

City of Ann Arbor

Replace approximately 4,500 lf of existing 4" and 6" water main with new 8' water main in order to reduce water main breaks, improve water quality by providing looping and increase fire protection coverage on Glendaloch, Loyola, Elmcrest, Anderson, GLEACH Water Main Replacement Project Clair 5/9/2009 Washtenaw Avenue Water Main Replacement Replace approximately 3,000 lf of existing 12" ductile iron pipe that has corroded to Project the point of failure with a new 12" water main. 6/9/2009

City of Ann Arbor

City of Ann Arbor

Steere Farm Raw Water Main Replacement Project

R d

e t tt

$

700,000

8/9/2009

$

1,100,000

1,750,000

10/9/2009

$

7/11/2009 12/20/2009 6/30/2010

$ $ $

54,000,000 540,000 n/a 850,000 n/a

Storm system South Main Street to mouth of River

8/30/2009

6/30/2009

$

815,000 n/a

Wastewater system improvements Water Plant Upgrade

Treatment plant, clean holding cells, upgrade force main and collection system Replace aged diatomaceous water plant

10/30/2009 3/30/2010

3/30/2010 12/30/2010

$ $

Resurface major street 6/30/2009 1.5 Million Gallon elevated water storage tank centrally located at the City Civic Cente Complex Aug., 09

10/3/2009

$

i m

b u S

City of Ann Arbor City City

Residuals Handling Improvements Project Water Distribution System Improvement Au Gres Industrial Park Expansion Storm System Extension with Pedestrian Access.

City of Au Gres

City

City of Au Gres City of Au Gres

City City

City of Au Gres

City

Street surface overlay

City of Auburn Hills

Auburn Hills

CC Water Storage Tank

Submitted Requests - Not Approved

5/9/2009

9/9/2009

The Residuals Handling Improvements Project replaces the worn and inefficient residual solids processing equipment and renovates the existing structure housing the process equipment at the Ann Arbor WWTP. Additional items such as odor management and treatment are also being addressed as part of this project. This project is critical to maintaining treatment and solids processing capacity at the WWTP. 2/9/2009 Upgrade and improve water system 8/30/2009 Storm sewer, water main sanitary sewer roadway 9/30/2009

City of Ann Arbor City of Au Gres City of Au Gres

02262009

Replace approximately 4,200 lf of existing 20" ductile iron pipe that has corroded to the point of failure with a 30" water main that will meet future capacity needs.

O R

PP

Rehabilitiation and/or replacement of failing sanitary sewer manholes which no longer allow access for maintenance and operation of the City's sanitary collection system 7/9/2009

s

Summer 2009

Route (Infrastructure Only)

600,000

$

City of Ann Arbor

City of Ann Arbor

Project Name

Expected Completion Date

Dec., 10

785,000 n/a 2,000,000 n/a North and South of 225,000 US 23 Civic Center Complex

71 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Auburn Hills

Auburn Hills

Opdyke Water Storage Tank

Opdyke Road North of Pontiac Road 1.5 Million gallon elevated water storage tank

Aug., 09

Dec., 10

City of Auburn Hills

Auburn Hills

Auburn Road 20" Water Main

Aug., 09

May, 10

City of Auburn Hills

Auburn Hills

Featherstone Road 20" Water Main

Auburn Road 16" water main improvement Squirrel Road to Opdyke Featherstone Road 20" water main improvement between DWSD Meter and Doris Road

Aug., 09

May, 10

City of Auburn Hills

Auburn Hills

Featherstone Road 16" Water Main

Featherstone Road 16" water main improvement Doris Road to Opdyke

Aug., 09

May, 10

City of Auburn Hills

Auburn Hills

Adams Road 12" Water Main

City of Auburn Hills

Auburn Hills

Pontiac Road 12" Water Main

Adams Road 12" water main improvement Auburn Road to South Boulevard. Aug., 09 Pontiac Road 12" water main improvement Pontiac Road from Commonwealth to Five Points Drive Aug., 09

City of Auburn Hills

Auburn Hills

Opdyke Road 16" Water Main

Opdyke Road 16" water main improvement Featherstone Road to Walton Boulevard Aug., 09

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Brown Road 12" Water Main Village Center Parking Structure

City of Auburn Hills

Auburn Hills

City of Auburn Hills

Auburn Hills

O R May, 10

Brown Road 12" water main improvement Glenmeade Road to Lapeer Road Village Center 200 space parking structure

Aug., 09 Aug., 09

May, 10 March, 11

River Walk

River Walk master plan development along the Clinton River in the Village Center

Aug., 09

April, 10

Taylor Road

Completion of Taylor Road realignment to Lapeer Road

Aug., 09

April, 10

Nov., 09 Nov., 09

Nov., 10 April, 10

s

O N

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Sanitary Sewer Rehabilitation Galloway Storm Water Management

City of Auburn Hills

Auburn Hills

Bloomfield Orchards Water Main

Bloomfield Orchards water main improvement project

June, 09

Nov., 09

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Joy Road Water Main Dept. of Public Service relocation

May, 09 May, 09

Sept., 09 May, 10

City of Auburn Hills

Auburn Hills

Hawkwoods Nature Center Cabins

Joy Road water main improvement, sewer rehabilitation, asphalt road reconstruct Reconstruction and relocation of the Department of Public Services facility Reconstruction of the cabins, nature center and lodge at the Hawkwoods Nature Center

April, 09

April, 10

City of Auburn Hills

Auburn Hills

Walton Blvd. Streetscape

Nov., 09

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Hawthorne Forrest Pedestrian Pathways

Walton Boulevard streetscape and street lighting from Opdyke Road to Squirrel Road May, 09 Hawthorne Forrest subdivision curb/catch basin rehabilitation, asphalt road mill and overlay May, 09 Pedestrian pathway intersection improvements for ADA compliance April, 09

City of Auburn Hills City of Auburn Hills

Auburn Hills Auburn Hills

Galloway Trail Link Amberwood Conservation Area

City of Bay City

Bay City

City of Bay City

Bay City

City of Bay City

Bay City

City of Bay City

Bay City

City of Bay City

Bay City

City of Bay City

Bay City

02262009

S

ub

eq

R d

e t tt

i m

e u

Galloway Trail Link pedestrian pathway from Squirrel Road to Bald Mountain Road connecting to the Hawkwoods Nature Center Amberwood Conservation Area park development

April, 09 May, 09

D VE

May, 10

Reconstruct the Sanitary Sewer System in the Clinton Oakwood Sanitary Sewer District Completion of the Galloway Storm Water Management project

st

Opdyke Road Squirrel Rd. to Opdyke DWSD meter and Doris Road Doris Road to Opdyke Auburn Rd. to South Boulevard Commonwealth to Five Points Dr. Featherstone Rd. to Walton Blvd. Glenmeade Rd. to Lapeer Rd.

May, 10

PP

A T

Funding Request

Taylor Rd. to Lapeer Rd. Clinton Oakwood Sanitary Sewer District Bloomfield Orchards Joy Road

July, 09 Nov. 11

Hawthorne Forrest

Squirrel Rd. to Bald Mountain Road

June, 09 Sept., 09

OakRidge Cemetery

Replace 5,700 lineal foot of chain link perimeter fencing for municipal owned cemetery8/1/2009

12/31/2009

$

125,000

OakRidge Cemetery

Mill and resurface 4,300 feet of asphalt drives in municipal owned cemetery 8/1/2009 Replace approximate 1 1/2 miles of chain link permiter fencing and security gates for municipal owned airport 8/1/2009

12/31/2009

$

250,000

12/31/2009

$

350,000

8/15/2009

10/15/2009

$

1,100,000

Walnut Street Reconstruction

Concrete Joint Repair on 6,500 lineal feet of Truman Parkway & Signal Upgrades Reconstruct 1,950 lineal feet of Walnut Street from Vermont Street to Veterans Memorial Bridge including utilities and sidewalks

3/1/2010

6/30/2010

$

1,050,000

Midland Street Reconstruction

Reconstruct 1,700 lineal feet with replacement of utilites and a portion of sidewalks

3/1/2010

6/30/2010

$

1,160,000

James Clements Airport Truman Pkwy/Woodside Ave.

Submitted Requests - Not Approved

Route (Infrastructure Only)

72 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Bay City

City of Bay City

City of Belding

Bay City

Bay City

Belding, Michigan

Project Name

Project Description

Start Date

Expected Completion Date

11th Street Reconstruction

Reconstruct 11th Street less than two blocks west of Saginaw Street. This will complete the entryway to a 48 acre brownfield site to encourage private investment on this high profile riverfront. 6/1/2009

11/15/2009

James Clements Airport - Seaplane

Provide funding for improvements to the City owned James Clements Airport Seaplane Base. Construction of launch ramp with accompanying docks; with paved access drive linking to the Airport proper. 9/1/2009

3/1/2010

Belding Wastewater Improvements

These sewer improvements will complete the work listed in the Project Plan approved by MDEQ. The two lift stations are already designed and are desperately needed. A local business is hooking up to the City sewer system in the next month or so, and will be sending wastewater through the W. Ellis Lift Station which may not be able to handle the flow. In addition, this business is adding over fifty new employees. Since this business is not industrial, we are not able to obtain grants for lift station improvements. We spent over $4.5 million in wastewater upgrades last year, and don’t have the funds for more improvements. Most of the sanitary sewer improvements will be lining the sewer mains. About $89,000 will be to replace the sewer mains. At this time, we do not have the funds available for an SRF low-interest loan. This project is of very high priority. 6/9/2009

Water Main Improvements and York Street Reconstruction Project

Although York Street needs to be reconstructed, the main focus is the water main improvements on York Street and subsequently crossing the Flat River. This water main upgrade is the number one priority in our Water Master Plan. This upgrade will provide a direct connection between our two 500,000 gallon water towers. This will provide a tremendous boost to our water system by stabilizing and increasing pressure and flows by looping the water system from the Reed Street Well, which is immediately adjacent to the north end of York St., to the Hall Street water tower. This line will also serve the City’s largest manufacture which employs 225 people in a meta extrusion process producing metal for other industries. The four businesses in the city’s only industrial park which employ approximately 190 people will also be served by this upgrade, along with another nine small manufacturers on adjacent streets employing approximately 143 people. York Street is nothing but a pot hole patched street with no storm sewer or curb and gutter. This road would be fully reconstructed to bring it up to standards. The need is so great among our local streets that we do no6/9/2009

T O

P P A

O R

Funding Request

$

550,000

D VE $

3/10/2009

$

3/10/2009

$

Route (Infrastructure Only)

355,000

1,285,900 City-Wide

N s

t s e

City of Belding

Belding, Michigan

R d

e t tt

i m

City of Belding

b u S

Belding, Michigan

02262009

u q e

High Street Reconstruction and Bank Stabilization Project

High Street may soon have to be renamed Low Street. The bank is destabilizing and the road is sagging in many places. It needs to be fully reconstructed and new watermain installed. This road is not a federal-aid eligible road, so therefore it is our hope that this road would qualify under the stimulus package. With the Flat River, a Michigan Natural Waterway, at the bottom of the hill, there are erosion concerns as well. This is a critical road due to the need for erosion control, the need to install storm sewer, the need to upgrade watermain, the need to stabilize the bank, and the need to reconstruct the deteriorated road. High Street is a connector for two major streets that are gateways into the downtown of Belding. Through a traffic survey conducted in 2005, approximately 3,000 vehicles per day travel through the area feeding into the downtown. The high location of the north bank of the Flat River is visible from all vantage points along the south side of the River, and is particularly visible from the downtown and the community’s Main Street. Because the topography rises up to the north side of the river, and the river curves through the downtown, the d6/9/2009

Submitted Requests - Not Approved

3/10/2009

$

727,000 York Street

High Street between North State and Bridge 1,393,100 Street.

73 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Belding

Project Name

Project Description

Belding, Michigan

Central Riverside Downtown Parking Lot & Trailhead Parking Lot

Start Date

Expected Completion Date

Central Riverside Parking Lot services the City's downtown area, which is participating in Michigan's Main Street Program at an Associates Level, providing parking for downtown employees and visitors to the dowtown area. The lot, located on the banks of the Flat River, provides parking for the following: Central Riverside Park, on the bank of the River also, with picnic sites & shelters, soccer field, tennis courts, in-line skate park area, play equipment, basketball courts & public restoorms; two downtown restaurants, one with banquet facilities; & the City's Registered Historic ca. 1920 train depot, now used as a community center, meeting facility, & the public transportation dispatch center with restrooms & a kitchen. Employees of one of the City's largest downtown employers, 90 people, could use this lot for parking. Adjacent to the parking lot is the Mid-Michigan Railroad which is a Rails-to-Trails project slated for purchase in 2010 through a $650,000 Non-Motorized Pathway Enhancement grant. This area will be the trailhead for the City, & connects into the City's river trail & pathway system. The adjacent streets at the intersections of Main & Bridge St., & at D6/9/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

3/10/2009

$

Depot St. & Bridge 3,314,268 St.

Belding City Hall Restoration and Rehablitation

The City Hall of Belding, Michigan, or “Town Hall” as it was originally known was designed by the Grand Rapids firm of Osgood and Osgood architects and constructed in 1912. It is an excellent example of the Classical Revival period of American architectu Belding, Michigan

New Construction of E Klock Road - See Attached

8/31/2009

12/31/2010

$

1,500,000 Klock Road

Reconstruction of Klock Road - See Attached

8/31/2009

12/31/2010

$

1,500,000 Klock Road

Reconstruction of Highland Ave - See Attached

10/31/2009

12/31/2010

$

2,000,000 Highland Ave

Reconstruction of Territorial Road - See Attached

10/31/2009

12/31/2010

$

2,500,000 Territorial Road

Pipestone Ave

Reconstruction of Piipestone Ave - See Attached

10/31/2009

12/31/2010

$

3,000,000 Pipestone Avenue

Waterfront Stage

Construct Waterfront Stage - See Attached

10/1/2009

12/31/2010

$

5,000,000 Jean Klock Park

RiverView Canal

Riverview Canal Project - See Attached

10/31/2009

12/31/2010

$

10,000,000 Riverview Drive

City of Benton Harbor Benton Harbor

undersized watremains

Replacement of undersized watermains - See Attached

10/1/2009

12/31/2010

$

15,000,000 Citywide

City of Benton Harbor Benton Harbor

Local Streets

Reconstructing Local Streets - See Attached

10/31/2009

12/31/2010

$

25,000,000 Citywide

City of Benton Harbor Benton Harbor

Main St

Main St Sewer and Water Replacement - See Attached

4/1/2009

12/31/2010

$

12,000,000 BL-I94

N s

t s e

City of Belding

(616) 794-4800

City of Benton Harbor Benton Harbor

E Klock Road

City of Benton Harbor Benton Harbor

W Klock Road

City of Benton Harbor Benton Harbor

Highland Avenue

City of Benton Harbor Benton Harbor

Territorial Road

City of Benton Harbor Benton Harbor

S

City of Benton Harbor Benton Harbor

02262009

R d

e t tt

i m

ub

City of Benton Harbor Benton Harbor

u q e

Submitted Requests - Not Approved

[email protected] ng.mi.us

74 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

City of Benton Harbor Benton Harbor

Lift stations

Lift station Upgrades - See Attached

10/1/2009

12/31/2010

$

1,000,000 Citywide

City of Benton Harbor Benton Harbor

Hall Park

Hall Park Renovation - See Attached

10/1/2009

12/31/2010

$

1,500,000 Hall Park

City of Benton Harbor Benton Harbor

Ravine Sewer

Replacement of Sewer in Ravine - See Attached

5/1/2009

12/31/2009

$

750,000 Ravine

City of Benton Harbor Benton Harbor

2009 Watermain

2009 Watermain Replacements - See Attached

6/1/2009

12/31/2009

City of Benton Harbor Benton Harbor

Bishop Sewer

Replacement of Bishop St Sanitary Sewer - See Attached

6/1/2009

City of Benton Harbor Benton Harbor

Washington St

Replacement of Washington St Sanitary Sewer - See Attached

6/1/2009

City of Benton Harbor City of Boyne City City of Boyne City City of Boyne City

McCord Sewer

Replacement of McCord Sanitary Sewer - See Attached New well Contruct new public works facility Marina/boat launch reconstruct and expansion

6/1/2009

Benton Harbor Boyne City Boyne City Boyne City

A T

City of Boyne City

Court Street Area ReConstruction: Existing: Gravel/deteriorated bituminous-extreme wash out areas even with medium intensity rains. Existing sanitary sewer and water main in poor conditions and some areas in need of sanitary sewer and water service. Proposed: Reconstruct 5,280 linear feet of street /drainage improvements/saintary sewer/water mains Boyne City Marina Renovation/Expansion: Reconstruction/expansion of the existing marina and launch ramp facilities

City of Boyne City

Division Street Reconstruction: Existing: Bituminous Street with gravel shoulders, bike path and poor drainage in need of sanitary sewer in several areas. Proposed: Reconstruct 8940 linear feet of street to accommodate truck route. Reconstruct bike path as necessary and install some sanitary sewer

City of Bridgman

The proposed project is located in the City of Bridgman on Lake Street from Church Street to Red Arrow Highway and on Red Arrow Highway from Willard Street to I-94. The project will include a gateway intersection unique to the City of Bridgman and seatwall planters with a lower elevation adjacent to the roadway. Symbols of Bridgman will be stamped in or attached to various features such as the sidewalk, seatwall planters, and light poles throughout the project. The gateway intersection arches will be mimicked on both I-94 off-ramps to help promote tourism in the downtown area and provide signing for the City owned Weko Beach and Campground and other local amenities. The sidewalks are in fair condition and will be improved where needed to enhance non-motorized access. Additionally, decorative sidewalk treatments, vegetation, seatwall planters, and lighting will be used to enhance the streetscape for tourists visiting Bridgman. 5/15/2009

City of Boyne City

s

t s e

O N

u q e

$

1,000,000

$

1,000,000 Bishop

12/31/2009

$

1,200,000 Washington St

12/31/2009

$ $ $ $

1,300,000 McCord 300,000 1,850,000 6,000,000

11/1/2009

$

1,752,000

5/1/2011

$

1,306,000

11/1/2010

$

2,368,000

11/15/2009

$

Lake Street and Red Arrow 5,720,000 Highway

4/1/2010

$ $

4,649,200 905,000

$

COURT STREET TO GENESEE 2,500,000 ROAD

O R

PP

D VE

12/31/2009

R d

City of Bronson City of Burton

City of Burton

i m

Lake Street and Red Arrow Highway Streetscape Project

City of Bridgman

ub

S

Bronson City CITY OF BURTON

CITY OF BURTON

02262009

e t tt

Rural Development - Bronson MAPLE AVE BRIDGE RECONSTRUCT

Upgrade the effeciences of local government by improving well houses, electricial, and security, installing a backup generator, overhauling a pump and motor, additional well and iron removal plant, and limited land acquisition to support these projects. 6/1/2009 RECONSTRUCTION OF MAPLE AVE BRIDGE OVER THREAD CREEK

DAVISON ROAD RECONSTRUCT

THE RECONSTRUCTION OF THE 4 AND 5 LANE PORTION OF DAVISON ROAD BETWEEN COURT STREET AND GENESEE ROAD

Submitted Requests - Not Approved

9/1/2009

75 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Burton

Burton CITY OF BURTON

City of Burton

CITY OF BURTON

CITY OF BURTON

ATHERTON RD BRIDGE OVER THREAD CREEK BRISTOL RD BRIDGE OVER THREAD CREEK

CENTER RD RESURFACE

City of Burton City of Burton City of Burton

CITY OF BURTON CITY OF BURTON CITY OF BURTON

CENTER RD RESURFACE MAPLE AVE DRAIN X-ING WATER TOWER REHAB

City of Burton

CITY OF BURTON

CLARICE STREET PAVING

City of Burton City of Burton City of Burton City of Burton City of Burton

Project Description

CITY OF BURTON CITY OF BURTON CITY OF BURTON CITY OF BURTON CITY OF BURTON

425,000

REHABILITATION OF BRISTOL RD BRIDGE OVER THREAD CREEK

$

425,000

MILL AND RESURFACE WITH CURB REPAIRS AND SIDEWALK IMPROVEMENTS ON A MAJOR 5 LANE STREET BETWEEN THE CITY OF FLINT AND THE CITY OF BURTON 0.5 MILES

$

LAPEER RD. TO 850,000 COURT STREET

7/1/2009 7/1/2009

$ $ $

MAPLE AVENUE TO LAPEER 1,100,000 ROAD 45,000 70,000

7/1/2009

$

A T

O N

u q e

INSTALLATION OF NEW 8 INCH DUCTILE IRON WATERMAIN FOR THE PURPOSES OF LOOPING AND INCREASING PRESSURE RECONSTRUCTION OF THE DRAIN CROSSING AT PHILLIPS DRAIN PAVING OF OLD GENESEE RD PAVING OF SITKA STREET PAVING OF ALCOTT STREET THIS STREET BORDERS A COUNTY PARK

R d

ub

S

$

t s e

e t tt

City of Burton

CITY OF BURTON

SOUTHEAST SEWER RELEIF

City of Burton

CITY OF BURTON

GRAVEL STREET PAVING PROGRAM

D VE 3,500,000

REHABILITATION OF ATHERTON RD BRIDGE OVER THREAD CREEK

10/1/2010

Funding Request

Route (Infrastructure Only)

$

s

SOUTH SAGINAW WATER LOOP VASSAR RD DRAIN X-ING OLD GENESEE RD PAVING SITKA STREET PAVING ALCOTT STREET PAVING

O R

PP

MILL AND RESURFACE WITH MINOR CURB REPAIRS AND RESTRIPING FROM MAPLE AVE TO LAPEER RD 3.5 MILES RECONSTRUCTION OF THE DRAIN CROSSING AT GILKEY CREEK 4/1/2009 ROUTINE MAINTAINENCE BASED ON MANDATORY INSPECTIONS 4/1/2009 PAVING OF CLARICE FROM CENTER ROAD TO ATHERTON ROAD PROVIDING A PAVED ROAD TO VAN WYE SCHOOL. 4/1/2009

i m

02262009

Start Date

The City of Burton and Burton Fire and Rescue are presenting a shovel ready project for your consideration. Burton’s fire station #2 located on Belsay and Lapeer Roads was built in 1948 and a small addition added in 1972. Station #1 is a steel pole building with the interior being designed and built by firefighters from that station. Station #3 is a gas station that had been converted to a fire station in the 1970s. Prior to the economy making a u-turn Burton government had decided to build a new fire station to replace station #2 and remodel the other two stations. We therefore obtained property necessary for the build, had the property surveyed and bore samplings done. An architect was hired and all of the plans were drawn for all of the work on all three stations. Prices were quoted and we were ready to start. Station #2 will be a 17,000 square foot building with five bays for apparatus, a training and general assembly room (available to use by the public), a kitchen, both male and female locker rooms and rooms with the possibility of becoming dorm rooms in the future. Geothermal heating and cooling would be used along with other green options April 14,2009

City of Burton

City of Burton

Project Name

Expected Completion Date

4/1/2009 4/1/2009 4/1/2009 4/1/2009 4/1/2009

INSTALLATION OF NEW SANITARY SEWER LINES TO RELIEVE OVER CAPACITY IN THE SOUTH EAST CORNER THE CITY OF BURTON, NORTHEAST CORNER OF GRAND BLANC TOWNSHIP, SOUTHWEST CORNER OF DAVISON TOWNSHIP AND THE NORTHWEST CORNER OF ATLAS TOWNSHIP 4/1/2009 SHAPING AND PAVING OF THE 13 + OR - REMAINING MILES OF GRAVEL STREETS IN THE CITY OF BURTON WITH STORM SEWER IMPROVEMENTS 5/1/2009

Submitted Requests - Not Approved

95,000

$ $ $ $ $

SAGINAW RD FROM MAPLE AVE TO JOLSON 145,000 ST 165,000 172,690 175,000 188,000

10/1/2009

$

CROSS COUNTRY FROM THE COUNTY PUMP STATION AT THE CENTER OF SECTION 28 TO ATHERTON ROAD BETWEEN GENESEE RD 2,500,000 AND BELSAY RD

11/1/2010

$

8,750,000

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

76 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Caspian

City of Caspian

City of Caspian

City of Caspian

Project Name

Project Description

Start Date

Phase III - Sewer System Improvements Project

In 2004 the City of Caspian completed a sanitary sewer system flow metering study to identify areas of collection sewers prone to excessive clear water infiltration and inflow (I/I). This study was completed to comply with the City’s District Compliance Agreement (DCA) with the Michigan Department of Environmental Quality (MDEQ). Their DCA also requires that the City complete improvements to reduce I/I to acceptable levels. Over the past 4 years the City of Caspian has completed a series of projects on their sanitary sewer collection system to remedy their I/I problem. However there are still areas identified within the collection system which are prone to I/I due to their location and deteriorated state. The portions in particular include collection sewers on Lawrence Ave., Bengal St., River Ave. and Spring Valley Road. These areas have been included within proposed project planning and design stages, however have not been construction due to budget constraints. The proposed stimulus project submitted includes the replacement of the deteriorated sewers identified above which were eliminated from previous projects. 6/1/2009

City Hall Upgrades

In this project, all windows will be replaced with high energy rated windows. The building exterior will be cleaned, the mortar joints tuck pointed, defective or missing bricks replaced, and the loose fascia repaired.

Community Center Upgrades

240,000

9/1/2009

9/1/2010

$

225,000

In this project, all windows will be replaced with high energy rated windows. The roof will be properly insulated to reduce heat loss and gain. The existing roofing will be replaced with proper venting installed. 9/1/2009

9/1/2010

$

190,000

$

63,000

A T

O N

City of Cedar Springs

The City of Cedar Springs/Nelson Township Fifth Street Resurfacing

Mill and resurface Fifth Street and parking lot between Cherry and Muskegon.

The City of Cedar Springs/Nelson Township South Main Street Reconstruction

Project includes removal of the asphalt surface and base materials, curb and gutter, drive approaches, and sidewalk as needed at the driveway approaches. Reconstruction will include new storm sewer as needed, asphalt surface roadway of three lanes in width, concrete curb and gutter, and sidewalk at driveways. It also replaces a 4-inch diameter water main with a 12-inch diameter water main to complete a critical larger diameter loop within the City.

City of Cedar Springs City of Charlevoix City of Charlevoix City of Charlevoix

s

City of Charlevoix

City of Charlevoix

City of Charlevoix

City of Charlevoix

itt

d e t

m b u

City of Charlevoix City of Charlevoix

02262009

qu

e R

installation of LED lights at Muncipal Airport

Park avenue road and utility improvements fiber optic network extensino

6/15/2009

The City has one 10" water main serving the entire system (from the well field). The 10" main is too small to run wells #4 & #5 simultaneously when demand is high. According to the City's water reliability study, the #1 priority for the water system is to When funding install a 12" water main extending from the south and tie into the existing 12" water becomes main at the high school. available. Mason St. improvements Park Ave. improvements Clinton St. improvement

9/4/2009

Four weeks after start date

Commence upon receipt of federal funding fall of 2009

Building efficiency improvements

S City of Charlevoix City of Charlevoix

t s e

North Central Michigan College has a duty to provide quality instruction in these areas and help students seeking a career in health care to acquire the necessary skills. North Central Michigan College requests $10,428,400 for the renovation and addition to the current chemistry and science buildings (Health Education and Science Center) A project of this size would have a tremendous impact on our entire region. It would lead to employment for hundreds of people. And once the building project is completed, we would be training workers to fill positions that are currently going unfilled in our local health care institutions. This is workforce development from beginning to end! spring of 2009

Submitted Requests - Not Approved

9/9/2009 fall of 2009

Route (Infrastructure Only)

D VE $

City of Caspian

The City of Cedar Springs/Nelson Township Well Field Water Main Loop Completion Charlevoix Charlevoix Charlevoix

PP

O R

Funding Request

11/1/2009

City of Caspian

City of Cedar Springs

Expected Completion Date

$

South of Muskegon 528,400 to South Street

$ $ $ $

410,000 164,000 406,000 534,000

$

Five City Hall 116,499 Buildings

$

Charlevoix 300,000 Muncipal Airport

$ $

Parke Avenue from bridge to lake 876,698 street 138,000 city of charlevoix

77 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Charlevoix

City of Charlevoix

City of Charlevoix

City of Charlevoix

City of Charlevoix

City of Charlevoix

City of Charlevoix

City of Charlevoix

Project Name

Project Description

Start Date

clinton street road and utility improvements

Health care is the largest and fastest-growing industry in the northern Lower Michigan counties served by North Central. Northern Michigan Regional Hospital (NMRH) based in Petoskey is a 243-bed regional referral hospital with a staff of 1,700 including more than 200 physicians, 536 registered nurses and an annual payroll of $77.9 million. The majority of registered nurses working at NMRH graduated from North Central's nursing program. Charlevoix Area Hospital, a 25-bed community hospital serving Charlevoix and Antrim counties, also depends on North Central for the majority of its nurses. Approximately half the nurses at Cheboygan Memorial Hospital are NCMC graduates. Also, at Cheboygan Memorial the majority of certified medical office assistants are NCMC graduates. Additionally, Otsego Memorial Hospital in Gaylord continues to hire registered nurses, licensed practical nurses and technicians to serve the growing needs of our area's full- and part-time residents. Nationwide, the Bureau of Labor Statistics forecasts that 13 of the 20 fastest-growing occupations in the next seven years will be in health care-related fields.

industrial park

At the same time, the rising cost of tuition at four-year colleges is heightening the importance of North Central's role as an economical alternative close to home for students who seek a college education. A registered nurse who graduates from our two-year program will have a positive impact on our local economy of an estimated $84,000 annually.

T O

State street road and utility improvements Construction of Airport Hangars at Municipal Airport

State street road and utility improvements

s t s

Expected Completion Date

O R

P P A spring of 2009

-N

Funding Request

Route (Infrastructure Only)

D VE

9/9/2009

$

clinton street from bridge to state 115,340 street

fall of 2009

$

Charlevoix 510,000 industrial park

9/9/2009

Construction of Airport Hangars at Municipal Airport

$ $

state street from park avenue to 1,263,949 carpenter avenue Charlevoix 1,900,000 Muncipal Airport

e u

City of Charlevoix

City of Charlevoix

tt i m

d e t

City of Charlevoix

City of Charlevoix

02262009

q e R

Construction of Airport Hangars at Municipal Airport

b u S

Building Efficiency Improvements

The Charlevoix Municipal Airport currently has a waiting list of approximately 10-12 airplane owners who are looking for aircraft hangar space. The City has no additional hanger space to offer to pilots with the current hangars beginning to reach the end of their useful life. Federal dollars could be used to construct new hangars with immediate occupancy for most of the new hanger space. The hangar space would create an additional revenue stream for the airport that would further assist to make the airport self-sufficient. Proposal is to build two hangar complexes that would house 15 additional aircraft (ranging in size from small, single engine planes through larger multi-engine and small corporate jets). This would provide about 35,000 square feet of new hangar space on City-owned land. Funding for project would be a strong Project will investment into sustainable air travel, a key economic development component in commence in northern Michigan. summer of 2009

Completion expected in Spring of 2010 $

In June of 2008 the City of Charlevoix in partnership with U.S. Energy Engineers, completed an energy audit for five City buildings- 1)City Hall, 2)Fire/EMS Department, 3)Mt. McSauba Ski Hill, 4)Water Treatment Plant, 5)Wastewater Treatment Plant. The audit was a result of the City’s on-going environmental efforts to create more efficient buildings by reducing both energy consumption and the City’s overall carbon footprint. The numerous energy efficiency improvements will continue the City’s efforts to be an environmental responsible leader in the community. Additionally, energy efficiency improvements will virtually pay for themselves with returns on investments of 2-4 years considering lower annual utility costs. Improvements and estimated costs per energy audit include: Installation of occupancy/daylight sensors ($15,000), updating lighting ($31,085), installing new and more efficient HVAC Project will systems in Water/Wastewater Treatment Plants, Street Department and Ski Lodge commence upon ($55,000), new heating in Fire/EMS vehicle bays ($15,414), We firmly believe federal receipt of federal monies spent on improving building efficiencies closely aligns with President Obama’s funding. Fall of 2009

Submitted Requests - Not Approved

$

Charlevoix 1,900,000 Municipal Airport

Five City buildingsCity Hall, Water Treatment Plant, Wastewater Treatment Plant, Fire/EMS, Ski Hill 116,499 Lodge

78 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Charlevoix

Project Name

Project Description

Start Date

Recently the City of Charlevoix has installed new LED Christmas lights on our downtown trees. The LED lights use substantially less electricity saving the City in energy costs while reducing the City’s carbon footprint. The downtown lighting project has been extremely well-received by residents and visitors alike and continue our efforts to be an environmental leader within our community. Furthering these efforts is a proposal to upgrade and improve the City’s Municipal Airport lighting (runways, taxiways, parking lights and general facility lighting) towards the newer LED and ‘greener’ lighting options available. The new technology that exists could save as much as 30%-40% from our current energy usage and therefore have a long-term Project will cost saving and pay back. The project closely aligns with President Obama’s green commence upon initiatives and would further the City efforts to be an environmentally friendly receipt of federal funding. 9/1/2009 Installation of LED Lights at Municipal Airport municipality.

O R

City of Charlevoix

City of Charlevoix

City of Charlevoix

Park Avenue Road and Utility Improvements

City of Charlevoix

d e tt

t i m

Fiber Optic Network Extension

Funding Request

Route (Infrastructure Only)

D VE

P P A

$

Charlevoix 300,000 Municipal Airport

Park Avenue reconstruction and underground utility work from Bridge Street to Lake Street (approximately 3,350 l.f.). The total costs of the project would be approximately $876,698, with an estimated $685,989 attributed to street reconstruction and drainage and $190,709 attributed to water and sewer lines. The main benefits to this project would be to improve one of the most deteriorated and frequently travelled roads in the City. Park Avenue serves as the main thoroughfare to the local hospital and the community’s most popular beach. It would improve water flows for fire protection, replace a section of sanitary sewer that has substantial root intrusion, radial and longitudinal cracking, and offset joints and improve drainage along the roadway. As Park Avenue runs parallel with Pine River Channel and Lake Michigan, stormwater filtration systems will be installed to filter out sediment and any contaminants from runoff whereby increasing efforts to maintain high water quality in Mid-April early Lake Michigan, Round Lake and Lake Charlevoix. May of 2009

9/1/2009

$

Park Avenue from Bridge Street to 876,698 Lake Street

The City of Charlevoix has recently executed an agreement with the Charlevoix School District collaborating on the installation of a joint fiber optic line though the community. Installation of the expanded joint fiber bandwidth will benefit both the City and School District allowing for video conferencing, added phone functionality, improved information flow, ability to monitor lift stations and promote radio read meters. In early 2009 the main fiber backbone will be complete with individual fiber cables to City buildings set to be installed in late spring/early summer of 2009. Furthermore, the City is in discussions with the local business community on ways tha the private sector could connect to, and benefit from, the expanded fiber optic network. To this end, the City requests funding for installation of the individual fiber lines serving five City buildings along with the Municipal Airport and Industrial Park. Funding would promote additional fiber lines to be installed in close proximity to our downtown area, airport and Industrial Park serving as a key component to recruit and retain much needed employers to our community. Offering the expanded fiber optic n Spring of 2009

Fall of 2009

$

138,000 City of Charlevoix

$

Clinton Street from Bridge Street to 115,340 State Street

T O

City of Charlevoix

Expected Completion Date

st

e u

q e R

N s

ub

S City of Charlevoix

City of Charlevoix

02262009

The construction of the Clinton Street Water Main Loop will greatly contribute to a more reliable water source whereby increasing fire protection in Charlevoix’s densely populated downtown area. Scope of the project is approximately 450 l.f beginning at Bridge Street and terminating at State Street. The project is consistent with the City’s efforts to loop main water lines throughout the community. Additionally, the street pavement on this well-travelled stretch of Clinton Street is deteriorating and will be repaved after installation of underground utilities. Based upon inspections done by City engineers, the water lines in this area are extremely old and deteriorating and need to be replaced as soon as possible. The total estimated costs of the project would be $115,340, with an estimated $96,922 attributed to street reconstruction and Mid-April early May of 2009 Clinton Street Road and Utility Improvements drainage and $18,418 attributed to a new water line.

Submitted Requests - Not Approved

9/1/2009

79 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Charlevoix

City of Charlevoix

Project Name

Project Description

Start Date

Industrial Park Underground Electric Circuit Construction

9/1/2009

$

5/1/2009

11/1/2009

$

Street Repair and Resurfacing Add New Sanitary Sewer Servcie to Commercial Zoned Area

5/1/2009 5/12/2010

11/1/2009 11/1/2010

$ $

State Street from Park Avenue to 1,263,949 Carpenter Avenue Major and Local 900,000 Streets Major and Local 900,000 Streets 1,000,000

Treatment System Upgrades and Repair Water Main Replacement - Storage Tank - Metering System

5/1/2010 5/1/2010

11/1/2009 11/1/2010

$ $

2,400,000 4,800,000 Through out City

Treatment System Upgrades and Repair Water Main Replacement - Storage Tank - Metering System Major and Local Street resurfacing and repair Wastewater Treatment Plan Upgrades Water System - Water Main Replacement

5/1/2010 5/1/2010

11/1/2009 11/1/2010

$ $ $ $ $

2,400,000 4,800,000 Through out City 950,000 2,200,000 2,900,000

Elmwood Reconstruction - Crooks to Rochester Road

$

3,000,000 Elwmood

Line or Replace Deteriorated Sanitary Sewers Road Patching - Various Streets

$ $

6,000,000 Various 500,000 Various

Main Street & Walper Traffic Signal Replacement

$

175,000 Main Street

14 Mile & Main Street Traffic Signal Replacement

$

175,000 14 Mile Road

$

175,000 14 Mile Road

$

125,000 14 Mile Road

O R

T O

P P A

City of Charlevoix

City of Charlevoix

State Street Road and Utility Improvements

City of Cheboygan

city

Street Repair and Resurfacing

Street Repair and Resurfacing

City of Cheboygan City of Cheboygan

city

City of Cheboygan City of Cheboygan

city city

Street Repair and Resurfacing East State St. Sanitary Sewer Ext. Wastewater Treatment Plant Repair and Upgrades Water System Upgrades Wastewater Treatment Plant Repair and Upgrades Water System Upgrades

tt i m

City of Cheboygan City of Cheboygan City of Cheboygan

City of Clawson

City of Clawson

City of Clawson City of Clawson

City of Clawson City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

02262009

d e t

Line or Replace Deteriorated Sanitary Sewers Road Patching - Various Streets Main Street & Walper Traffic Signal Replacement 14 Mile & Main Street Traffic Signal Replacement

N s

st

e u

q e R

Elmwood Reconstruction - Crooks to Rochester Road

ub

S

Funding Request

Route (Infrastructure Only)

The construction of a new three-phase underground electrical circuit from the Meech/Dixon intersection to the Mercer/Division intersection and then to the Industrial Park Substation will greatly improve the reliability of the electric system both in the Industrial Park and also for the whole north side of the City of Charlevoix. The City has recently faced the possibility of losing a large customer in the Industrial Park due to reliability concerns. Completion of the three-phase project would add a feeder circuit that would allow alternate feeds to the Industrial Park as well as alternate feeds to the rest of the electric system on the north side of the bridge. This would mean a potential outage of several hours would be reduced to a few minutes. Rectifying this on-going electrical infrastructure issue will greatly assist the City of Charlevoix to maintain current employers in the Industrial Park promoting job retention and recruitment to a sagging manufacturing economy. Spring of 2009

The construction of the State Street Water Main Loop will greatly contribute to a more reliable water source whereby increasing fire protection efforts. Scope of the project is approximately 3,600 l.f beginning at Park Avenue and terminating at Carpenter Avenue. The project is consistent with the City’s efforts to loop main water lines throughout the community. Additionally, the pavement on this highly- travelled stretch of State Street is deteriorating and will be repaved after installation of underground utilities. Based upon inspections done by City engineers, the sewer lines in this area are cracking with offsets in joints. The utilities in this area are extremely old and deteriorating and need to be replaced as soon as possible. The total estimated costs of the project would be $1,263,949, with an estimated $855,812 attributed to street Mid-April early reconstruction and drainage and $408,137 attributed to water and sewer lines. May of 2009

City of Cheboygan City of Cheboygan City of Cheboygan City of Cheboygan City of Cheboygan

Expected Completion Date

14 Mile & Bellevue Traffic Signal Replacement 14 Mile & Bellevue Traffic Signal Replacement 14 Mile & Guardian Angels Traffic Signal Replacement 14 Mile & Guardian Angels Traffic Signal Replacement

Submitted Requests - Not Approved

D VE

Fall of 2009

$

Charlevoix 510,000 Industrial Park

80 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

City of Clawson

Project Name 14 Mile & Rochester Road Traffic Signal Replacement Rochester Road & Goodale Traffic Signal Replacement Crooks Road & Elmwood Traffic Signal Replacement

City of Clio

City of Clio

Clio Sidewalk Upgrades

Crooks Road & Elmwood Traffic Signal Replacement Repair existing deteriorated sidewalk in the City of Clio. Upgrade numerous sidewalk ramps to meet current ADA standards. 3/26/2009

City of Clio City of Clio City of Clio

City of Clio City of Clio City of Clio

Clio Trail Project City Hall Parking Lot Lighting Clio Energy Audit

Repair existing trailway within city limits and construct new trail from M-57 to city park 6/26/2009 Install parking lot lighting at the Clio City Hall. 3/26/2009 Complete Energy Audit on City Facilities 3/26/2009

City of Clio

City of Clio

Clio Salt Storage Building

City of Clio City of Clio City of Clio

City of Clio City of Clio City of Clio

Clio Amphitheater Renovations Clio Water System Improvements Clio Sanitary Sewer Improvements

City of Clio

City of Clio

I/I Footing Drain Connections

Construction of a salt storage building for the Clio Department of Public Works. Building renovations to the existing amphitheater include: electrical, HVAC, windows, and stage reconstruction Alexander Street Water Main Replacement (560') Alexander Street Sanitary Sewer Replacement (560' Complete foot drain connections to the City's storm sewer system for approximately 600 homes.

Downtown Clio Streetscape

Improve the downtown corridor of Clio with the addition of Landscaping, Lighting/electrical, Pavement, Trash containers, sidewalks, Farmers market/community center, and signage.

City of Clio

City of Clio

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

Project Description

Start Date

$

125,000 14 Mile Road

Rochester Road & Goodale Traffic Signal Replacement

$

125,000 Rochester

$

125,000 Crooks

$

100,000

$ $ $

500,000 10,000 150,000

8/20/2009

$

125,000

6/26/2009 6/26/2009 6/26/2009

9/20/2009 6/28/2010 6/28/2010

$ $ $

200,000 2,611,500 2,611,500

6/26/2009

8/20/2010

$

3,000,000

6/26/2009

9/28/2009

$

3,000,000

s

t s e

O N

City of Coldwater

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only.Monroe St.

City of Coldwater

u S

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

02262009

qu

5/20/2009

O R

PP

6/26/2009

A T

City of Coldwater

City of Coldwater

Funding Request

Route (Infrastructure Only)

14 Mile & Rochester Road Traffic Signal Replacement

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Washington and Washington & Sprague Road Reconstruction Sprague St.

City of Coldwater

Expected Completion Date

6/9/2009

9/28/2009 5/20/2009 5/20/2009

12/9/2009

D VE

$

Washington (Clay to Jefferson) and Sprague St (Chicago to 900,000 Waterworks)

7/10/2009

$

Monroe St (Washington to 800,000 Grand)

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. E. Washington - Jefferson to Elm 10/9/2009

10/10/2009

$

E.Washington 360,000 (Jefferson to Elm)

E.Washington St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. E. Washington - Elm to Dead End

10/9/2009

10/10/2009

$

E.Washington (Elm 615,000 to Dead End)

N. Michigan Ave Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. N. Michigan - Chicago to Grahl

10/9/2009

10/10/2009

$

N. Michigan Ave ( 981,540 Chicago to Grahl)

N. Michigan Ave Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Orleans Michigan/Deadend

10/9/2009

10/10/2009

$

N. Michigan (Orleans to 367,080 Michigan/Deadend)

S. Michigan Ave Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. S.Michigan Saulk/Chicago

10/9/2009

10/11/2009

$

S. Michigan Ave 605,000 (Saulk to Chicago)

Bennett St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Bennett St Park to Hooker

10/9/2009

10/11/2009

$

Bennett St (Park to 170,000 Hooker)

Grand St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Grand Clark/Church

10/9/2009

10/11/2009

$

Grand St (Clark to 2,040,000 Church)

Monroe St Road Reconstruction

E.Washington St Road Reconstruction

itt

d e t

bm

e R

Submitted Requests - Not Approved

6/9/2009

81 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

City of Coldwater

Project Name

Project Description

Start Date

Pearl St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Pearl Hudson/Sprague

10/9/2009

10/11/2009

Walnut St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Walnut Riverside/Pearl

10/9/2009

10/11/2009

Taylor St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. Taylor Grand to Clay

10/9/2009

10/11/2009

S. Jefferson Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. S. Jefferson - Garfield/Chicago

10/9/2009

City of Coldwater

City of Coldwater

N. Jefferson St Road Reconstruction

Public roadway, curb and gutter reconstruction; in conjunction with reconstruction of water & wastewater infrastructure. Roadway only. N. Jefferson - Chicago/Pierce

City of Coldwater

City of Coldwater

Storm Water Illicit Discharge

Public storm water collection system illicit discharge study.

City of Coldwater

City of Coldwater

Downtown Parking Lot Reconstruction

Municipally owned, public parking lot reconstruction.

O N

City of Coldwater City of Coldwater

Chicago St Roadway Improvement Race St Bridge

City of Coldwater City of Coldwater City of Coldwater

City of Coldwater City of Coldwater City of Coldwater

Road Maintenance Linear Trail Extension Public Fishing Pier

Public roadway, mill and overlay berm, curb and gutter reconstruction. Bridge repair and culvert replac Public roadway maintenance to include mill/pulverize, overlay, crack fill, seal coat, micro pave, chip seal application on failing surface conditions. Linear trail extension Municipally owned, public fishing pier; Cemetery Lake

City of Coldwater City of Coldwater City of Coldwater City of Coldwater City of Coldwater City of Coldwater

City of Coldwater City of Coldwater City of Coldwater City of Coldwater City of Coldwater City of Coldwater

South Lake Dredging Smoke Stack Demolition Traffic Study Aerial Photography Sidewalk Improvements Willow's Bridge

Sauk River sediment dredging at South Lake inlet. Brownfield retired smoke stack demolition. Traffic study and signalization improvements at critical locations GIS mapping system, aerial photography Sidewalks extensions, repairs and ADA ramp design compliance Public two lane bridge demolition and footbridge construction

t s e

City of Crystal Falls

e t tt

02262009

Route (Infrastructure Only)

Pearl St (Hudson to 1,255,000 Sprague)

D VE $

Walnut St 675,000 (Riverside to Pearl)

$

Taylor St (Grand to 740,000 Clay)

10/9/2009

PP

10/11/2009

$

6/9/2009

8/10/2009

$

8/9/2009

8/11/2009

$

S. Jefferson (Garfield to 1,905,000 Chicago) N. Jefferson St 840,000 (Chicago to Pierce) Entire collection 125,000 system Downtown 2,500,000 Coldwater Chicago St ( Michigan Ave to 225,000 Butters) 400,000 Race St

6/9/2009 10/9/2009

8/10/2009 10/11/2009

$ $

6/9/2009 8/9/2009 10/9/2009

8/10/2009 8/11/2009 8/10/2009

$ $ $

6/9/2009 6/9/2009 6/9/2009 8/9/2009 6/9/2009 10/9/2009

8/10/2009 10/9/2009 6/10/2009 10/9/2009 6/11/2009 10/11/2009

$ $ $ $ $ $

2,000,000 City Wide 1,500,000 City Wide 200,000 Heritage Park Sauk River / South 225,000 Lake Inlet 70,000 Riverside Dr 60,000 City Wide 60,000 City Wide 1,200,000 City Wide 250,000 Old US 12

10/1/2011

$

2,271,202

$

7,032,732 Entire City

Sewer System Improvements Project

Water Distribution Project

Replace deteriorated watermain throughout the City. Old mains are leaking and flow is poor in many areas. Phase I of the replacement program was completed last year with Rural Development loan money. The overall project with all phases has been estimated and presented in a Rural Development Preliminary Engineering Report.

Submitted Requests - Not Approved

$

$

In 2008 the City of Crystal Falls completed a Project Plan through the Michigan Department of Environmental Quality’s (MDEQ) State Revolving Fund (SRF) program. This Project Plan included an evaluation of the City’s Sanitary Sewer System and identified system needs. The Project Plan identified six (6) Principal Project Alternatives (phases) which were recommended to be completed. A summary of each is included as follows. The Western Lift Station and Forcemain includes the replacement of the existing Western Lift Station with a new submersible sanitary sewer lift station and replacement of the forcemain. The Main Lift Station Upgrade includes a number of improvements to the lift stations grit handling and screening capabilities and access to the wet well to increase safety and ease cleaning. The Crystal Avenue, Park Street, and Poplar Avenue Sewer includes the replacement of deteriorated collection piping on Crystal Avenue, Park Street, and Poplar Avenue. The East Park Street Sewer includes the replacement of deteriorated collection piping on East Park Street. The Bristol Street Sewer includes the replaceme10/1/2009

b u S

City of Crystal Falls, MI

u q e

R d

i m

City of Crystal Falls

s

O R

Funding Request

10/11/2009

A T

City of Coldwater City of Coldwater

City of Crystal Falls

Expected Completion Date

Potential Start of 2009 depending on funding agency requirements 1 Year

82 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Crystal Falls

City of Davison

City of Crystal Falls, MI

Davison

Project Name

Project Description

Start Date

Expected Completion Date

Elevated Water Storage Tank Rehabilitation

Recoat (interior and exterior) the existing elevated water storage tank that is deteriorating. Upgrades to be in accordance with Professional Tank Inspection Recommendations completed in 2008. Repairs will also include cathodic protection, foundation repairs, overflow pipe improvements, hatch and vent replacement, ladder and handrail replacement and aviation lights. 6/1/2009

Footing Drain Disconnect Program

In 2006, City residents passed a millage (1.35 mils for twenty years) to support the City's participation in a State program to reduced inflow and infiltration to the City and County sanitary sewer system. Davison was one of the first communities to utilize the State Strategic Water Quality Initiatives Fund. In 2007, the City inspected the sewer connections in approximately 400 homes in an effort to disconnect 300 homes (as required by the City's application for funding). The City has met its target of 300 disconnections, and, based upon the successful diversion of unwanted water into the sanitary sewer system, the City wishes to expand the scope of the program to the remainder of the City. This program reduces the amount of water required to be treated by the regional wastewater treatment plant and improves the overall quality of the State's greatest natural resource: water. The program has been highly commended by area residents and has actually been completed at a cost below the original budget. 4/1/2009

Municipal Center Energy Conversion

D VE $

345,000 Existing Tank Site

3/31/2010

$

Streets: Oda, Kay, Gary Ray, Maxine, Leona; Sequoia, Fitzner, Tamarac, Hemlock, Juniper, Balsam; Rosemoor, Wisler, South, Viet; Collingwood, Delzingro, S. Dayton, Plymouth, 50,000 Salem

The City of Davison Municipal Center, constructed in the mid-1960s, houses City offices, including the Police Department and the district court. The facility's infrastructure is obsolete. The original boilers and air-handlers are no longer in production, nor are components for those units: repairs require cannibalization of othe units in the facility. The original five boilers have been reduced to four operational units. The air handler and condenser are the original units. Heating and cooling "zones" are dysfunctional: individual heating and cooling units are common throughou work areas. Windows are not energy-efficient and the original roof has been frequently patched. A preliminary energy audit, completed in late 2008, indicates that thousands of dollars can be saved annually with the application of modern energy technology. The City has a Letter of Intent on file to conduct a complete energy audit and proceed with the redesign and implementation of recommended improvements. The adjacent and identical sister building, which houses the second-busiest branch of the county's Genesee District Library, suffers from similar shortcomings, including the recent loss o5/4/2009

8/31/2009

$

500,000

As part of the existing and growing cooperation between City and Township government, discussions related to complete consolidation have commenced between high-level officials of both entities. Current cooperative agreements between the two governments include a fire department, a senior citizen center, parks and recreation operations, and several economic development initiatives. A review of combining additional departments (police) and services (building inspection, code enforcement, and assessing) is underway. The likelihood of total consolidation within the next five years is considered highly likely. The current municipal center located in the City and the government center in the township are both inadequate to meet the needs of this new streamlined government. In addition to housing the local district court (which offers no security to court personnel) and the Police Department (which does not mee current operational and safety standards), the City center is extremely inefficient from an energy perspective (another short-term project to modernize the center is being considered). The Township facility is too small to support the needs of a fully-functioni 6/1/2009

5/28/2010

September, 2010

$

5,000,000

December, 2010

$

6,000,000

T O

9/30/2009

Funding Request

Route (Infrastructure Only)

P P A

O R

N s

t s e

City of Davison

Davison

R d

e t tt

i m

b u S

City of Davison

Davison

City of Dearborn

City of Dearborn

Rouge River Wind Turbines

City of Dearborn

City of Dearborn

City Hall Campus Green Zone

02262009

u q e

Municipal Center Development

Install wind turbines along Rouge River as part of the Rouge Gateway project, which includes various energy conservation and water quality improvements 6/1/2009 Multiple improvements to the City Hall campus as a laboratory and showcase of green technologies and applications for the community 7/1/2009

Submitted Requests - Not Approved

83 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Dearborn

City of Dearborn

City of Dearborn

City of Dearborn

Dearborn

Dearborn

Dearborn

Dearborn

Project Name

Project Description

Expected Completion Date

Start Date

Patrol Rifle Program

This program provides rifles to the Patrol Division of the Police Department. This is an on-going funded project to increase the number of rifles assigned to scout car or unit. The approximate price of each rifle is $1,100.00.

TASER Initiative

This project will provide another tool to the uniformed officer working the street to assist in the apprehension of subjects. The project will help limit the injuries and laibility in arrest situations. Currently the police department has 15 TASERS, the additional 5 would allowed for every office working the shift to have one. The current cost of the unit is $810.00. Current Program On-going

A/V upgrade for police classroom

This project will upgrade the current A/V equipment in the classroom. The A/V system is obsolete which limits the type and quality of training the department can receive. The improvements would include a sound system, projection unit and upgraded command unit.

TBD

IT Specialist Initiative

This project if funded will provide a full-time civilian employee to assist the police departments IT manager with the everyday operations in technology, research and equipment maintenance.

Provides 80 new ballistic vests to uniformed officers for 2010. This is an on-going funded project replacing vests every five years for eligble officers The current price per vest is $500.00. WATERMAIN REPLACEMENT WATERMAIN REPLACEMENT WATERMAIN REPLACEMENT WATERMAIN REPLACEMENT

Funding Request

Will be on-going as Current Program long as it is funded $

O R

D VE

5,500

$

4,050

If funded July 2010 $

20,000

TBD

If funded July 2009 $

85,000

Current Program 7/1/2009 7/1/2009 7/1/2009 7/1/2009

Will be on-going as long as it is funded 6/30/2009 11/30/2009 6/30/2009 11/30/2009

$ $ $ $ $

40,000 157,500 275,000 350,000 420,000

2/1/2010 7/1/2009 7/1/2009 7/1/2009 7/1/2009

11/30/2010 6/30/2010 11/30/2010 8/30/2011 11/30/2011

$ $ $ $ $

551,100 1,000,000 4,000,000 6,000,000 10,000,000

CSO Control Facility WATERMAIN REPLACEMENT

Spring 2009 7/1/2009

12/1/2013 11/30/2009

$ $

Lower Rouge River 50,000,000 at Telegraph 180,000

STREET RESURFACING

7/1/2009

10/30/2009

$

207,900

STREET RESURFACING STREET RESURFACING STREET RESURFACING

7/1/2009 7/1/2009 7/1/2009

10/30/2009 10/30/2009 11/30/2009

$ $ $

268,552 389,670 393,145

STREET RESURFACING

2/1/2010

11/30/2010

$

75,000

STREET RESURFACING STREET RESURFACING

2/1/2010 2/1/2010

11/30/2010 11/30/2010

$ $

93,920 100,220

T O

P P A

City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn

Dearborn DEARBORN DEARBORN DEARBORN DEARBORN

Ballistic Armor Program MORROSS: WYOMING TO WISCONSIN BARRIE:WARREN TO MORROSS MOROSS: YINGER TO CHASE MONROE: DARTMOUTH TO MADISON

City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn

DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN

LODGE LANE: TELEGRAPH TO OUTER DR. STREET RESURFACING YINGER: DONALD TO WARREN WATERMAIN REPLACEMENT AND ASPHALT RESURFACING PARKING LOT RESURFACING PARKING LOT RESURFACING (AT 5050 SCHAEFER) SIDEWALK REPLACEMENT REPLACE DEFECTIVE AND HAZARDOUS SIDE WALK-CITY WIDE STREET PAVING REPAIR REPLACE DEFECTIVE AND HAZARDOUS PAVEMENT-CITY WIDE

City of Dearborn City of Dearborn

City of Dearborn DEARBORN

CSO Contract 9 LEONARD: MAPLE TO IRVING

City of Dearborn

DEARBORN

City of Dearborn City of Dearborn City of Dearborn

DEARBORN DEARBORN DEARBORN

LAPHAM: MICHIGAN AVE. TO PROSPECT FORT DEARBORN: CHERRY HILL TO KENSINGTON LINCOLN: CARLYSLE TO MADISON McKINLEY: CARLYSLE TO MADISON

City of Dearborn

DEARBORN

City of Dearborn City of Dearborn

DEARBORN DEARBORN

City of Dearborn

DEARBORN

S.MARTHA: MARSHALL TO CHERRY HILL STERLING PLACE: HIGHLAND TO ELMWOOD ROWE: HIGHLAND TO ELMWOOD STERLING PLACE: HIGHLAND TO ELMWOOD

WATERMAIN REPLACEMENT

2/1/2010

11/30/2010

$

100,650

City of Dearborn City of Dearborn

DEARBORN DEARBORN

ROOSVERE: MARSHALL TO CHERRY HILL STREET RESURFACING ROWE: HIGHLAND TO ELMWOOD WATERMAIN REPLACEMENT

2/1/2010 2/1/2010

11/30/2010 11/30/2010

$ $

104,280 107,400

City of Dearborn

DEARBORN

ROOEVERE: MARSHALL TO CHERRY HILL WATERMAIN REPLACEMENT

2/1/2010

11/30/2010

$

111,750

City of Dearborn City of Dearborn City of Dearborn

DEARBORN DEARBORN DEARBORN

ELMWOOD CT.: FORDSON TO FORDSON ELMWOOD: FORDSON TO CHERRY HILL S. YORK: FORDSON TO CHERRY HILL

2/1/2010 2/1/2010 2/1/2010

10/30/2010 11/30/2010 11/30/2010

$ $ $

118,928 120,000 211,760

tt i m

d e t

N s

02262009

t s e

qu

e R

b u S

Route (Infrastructure Only)

STREET RESURFACING WATERMAIN REPLACEMENT STREET RESURFACING

Submitted Requests - Not Approved

84 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Dearborn DEARBORN City of Dearborn DEARBORN City of Dearborn DEARBORN

Start Date 2/1/2010 2/1/2010 2/1/2010

Expected Completion Date Funding Request 11/30/2010 $ 211,800 11/30/2010 $ 232,450 10/30/2010 $ 244,955

Project Name S. YORK: FORDSON TO CHERRY HILL ROCKFORD: TELEGRAPH TO MELBORN BREWSTER: MIDDLEBURY TO ENDOVER

City of Dearborn

DEARBORN

S. MELBORN: FORDSON TO CHERRY HILL STREET RESURFACING

2/1/2010

11/30/2010

City of Dearborn

DEARBORN

2/1/2010

11/30/2010

DEARBORN DEARBORN

WOODLAND: EASTHAM TO MIDDLEBURY STREET RESURFACING LONG MEADOW: EASTHAM TO GREENFIELD STREET RESURFACING ELMWOOD: FORDSON TO CHERRY HILL STREET RESURFACING

City of Dearborn City of Dearborn

2/1/2010 2/1/2010

11/30/2010 10/30/2010

City of Dearborn City of Dearborn City of Dearborn

DEARBORN DEARBORN DEARBORN

ELMWOOD CT.: FORDSON TO FORDSON WAVERLY: FORDSON TO CHERRY HILL WAVERLY: FORDSON TO CHERRY HILL

WATERMAIN REPLACEMENT STREET RESURFACING WATERMAIN REPLACEMENT

2/1/2010 2/1/2010 2/1/2010

City of Dearborn City of Dearborn City of Dearborn

DEARBORN DEARBORN DEARBORN

MARSHALL: TELEGRAPH TO OUTER DR. ROOSEVELT: CARLYSLE TO MADISON DIX: FERNEY TO CITY LIMITS

City of Dearborn City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights City of Dearborn Heights

Dearborn

Window Replacement

STREET RESURFACING 2/1/2010 STREET RESURFACING 2/1/2010 DIX AVENUE STREETSCAPE 2/1/2010 Replacement of all window, doorwall and screens a total of 254 unit and lobby area fo Senior High Rise. 9/1/2008

Dearborn Heights

Street Lighting

Dearborn Heights

River Oaks Stormwater Pond Restoration

Dearborn Heights

DPW Facility Improvements

Dearborn Heights

Local Community Center Improvements

Dearborn Heights

City Hall Renovations

Dearborn Heights

Canfield Recreation Center

Dearborn Heights

Major Street Rehabilitation

Dearborn Heights

Local Street Rehabilitation

Dearborn Heights

Sewer Main Rehabilitation

Dearborn Heights

Water Main Replacement

Dearborn Heights

S

Dearborn Heights

-N

Improve street lighting and add new lighting for public safety and use LED lighting 3/1/2009 Restore existing River Oaks Stormwater retention pond and return to its original functionality 4/1/2009 Energy efficient improvements including windows, hvac, reorganization of office space including garage space 6/1/2009

s t s

e u

Improve existing Senior Centers and RA Young Center 6/1/2009 Improve existing City Hall to allow for energy efficient savings and allow for better use of space 4/1/2009 Replacement of the existing Recreation Building with 70,000 square foot Recreation and Fitness Center. 3/1/2009

eq

R d

$

279,000

$ $

328,500 331,141

11/30/2010 11/30/2010 11/30/2010

$ $ $

331,200 343,440 343,500

11/30/2010 11/30/2010 10/30/2010

$ $ $

359,800 400,830 1,500,000

4/1/2009

$

1,050,405

10/1/2009

$

500,000

12/1/2009

$

750,000

12/1/2009

$

1,000,000

12/1/2010

$

1,000,000

12/1/2010

$

2,500,000

9/1/2010

$

25,000,000

5/1/2009

12/1/2010

$

1,500,000

Improve local roads to allow for safety and effeciency

5/1/2009

12/1/2010

$

6,250,000

Replacement of aging sewer mains througout the community

3/1/2009

12/1/2009

$

8,000,000

12/1/2009

$

9,500,000

CSO Control URT Tunnel

Replacement of aging water mains throughout the community 3/1/2009 Elimination of three uncotrolled CSOs to the Middle Rouge River. These CSOs will be connected to the Detroit Regional Tunnel. 10/1/2009

10/1/2011

$

11,000,000

CSO Control Lower Rouge River

Elimination of three uncotrolled CSOs to Lower Rouge River

10/1/2009

10/1/2011

$

15,000,000

All-Kids Playground

To create a nature based experience that is accessible to all kids. The creation of a recreational experience where all patrons are able to learn, play, communicate, and enjoy the environment.

4/9/2009

6/9/2009

$

280,000

Purchase a GPS unit and software for GIS mapping, inventorying and assessing of storm sewers including outfalls in areas of possible riverbank erosion. To stablize the current river bank by using native grasses and shurbbery and the installation of a handicapped accessible boat launch.

4/9/2009 May 09 to June 09

11/9/2009

$

8,000

May 09 to June 09 $

57,000

e t t

it

City of DeWitt

City

City of DeWitt

City

GIS/GPS Mapping

City of DeWitt

City

River Bank Stabilization

02262009

T O

255,000

O R

P P A

D VE $

Improve major roads to allow for safety and effeciency

m b u

Dearborn Heights

Project Description WATERMAIN REPLACEMENT STREET RESURFACING STREET RESURFACING

Submitted Requests - Not Approved

Route (Infrastructure Only)

85 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of DeWitt

City of DeWitt

City of Dowagiac

City of Dowagiac

City

City

City of Dowagiac

City of Dowagiac

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

$

Main Street between Norris Road & Scott 220,000 Street

$

Wilson Street from Main Street to 550,000 Dartmouth

$

200,000

$

250,000

The Dowagiac school system has their middle school located on the end of Riverside Drive. This entrance is the only way in and out for the all the community activities which occur at this site. There has been a desire to have a second entrance created which will allow for better emergency vehicle access as well as community access to the facilities. Also, as part of this project, the City would like to loop their water main between the two dead ends in this area. The water main was extended to the middle school when the facilities were constructed in 2003 and a second water extension was just completed with a water main extended to the Southwestern Michigan College recent expansion. The college is growing and their recent expansion was a new dormitory facility. The City would like to connect these two dead ends to create better fire flow, higher quality of circulating water and create a more reliable feed to both of these educational facilities. The project will also encourage additional development by the P okagon Band of

$

907,000

The Division Street water main runs east – west through the heart of the City and is a very important part of the water distribution system. The line is currently undersized and is in need of attention. There are several twelve-inch lines that connect on to this six-inch line which would better serve this community if the Division Street water main were to be replaced. The benefits would not only be for better fire protection but also an increase in the reliability of the system and quality of the water.The water main will be replaced between the back of curb and the R.O.W. line. The exact location will be determined by the existing infrastructure in the area. Quite a bit of the sidewalk in the area will have to be replaced as part of this project. The estimated cost for this project is $1,133,814.

$

1,133,814

Main Street Resurfacing

Resurface road, repair sidewaks, including ADA ramps

7/7/2009

Wilson Street Reconstruction

Recontruction of Wilson Street. Cold mill and resurface entire street to Dartmouth and storm sewer repairs as needed.

Wolf Street Lift Station Project

The City currently has two lift stations within 1,200 feet of each other. Both of these lif stations are on the end of their life cycles and replacement of these structures will need to be accomplished within the next two years. The operation and maintenance for these structures is becoming excessive.The fiscally sound way of approaching this situation is to replace these two lift stations with a single lift station and pipe the flow from the other one. The cost for the abandonment of one lift station, gravity sanitary sewer and a new lift station is estimated to cost $200,000.

Relocate fire apparatus

The City has an undersized fire station located at a dangerous intersection in the downtown that is extremely energy inefficient. The operation can be moved to an existing building that was formerly a MDOT district operations building. The building has an efficient, radiant heating system. Plans call for adding insullation and energy efficient windows, moving of communications equipment, etc. Upon completion the old fire station would be removed and a public parking facility would be built in its place. Estimated cost - $250,000

Second Entrance to Middle School

T O

s t s

8/14/2009

P P A

O R

-N

D VE

e u

City of Dowagiac

City of Dowagiac

itt

City of Dowagiac

S

City of Dowagiac

02262009

m b u

d e t

Division Street Water Main

q e R

Submitted Requests - Not Approved

86 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Dowagiac

City of Dowagiac

Project Name

Project Description

Start Date

The City has several areas where sewer, water and storm sewer which are in dire need of attention. Grand Boulevard, Johnson Street, Halsted Street and Ashland Street are on top of this list. This area of the city has a sanitary sewer system which is too shallow and has issues with freezing during the winter. The water main in this area is undersized and should be upgraded for better fire protection flow, as well as for reliability of the distribution system. A new storm water collection system needs to be installed. so that the current runoff can be adequately managed and increase the life cycle of the roadway. The utility reconstruction will require road replacement. The project will update the infrastructure in an area of the community which could certainly use it. The upgraded facilities will also create a sense of pride in the area and could facilitate update to some of the local homes. The proposed new sidewalks will also create a sense of community and lead to better pedestrian movement in this area to the local park. The estimated cost for this project is $2,523,890.

Infrastructure Upgrade

O R

A T

City of Dowagiac

City of Dowagiac

Infrastructure Upgrade

City of East Jordan City of East Jordan City of East Jordan

City of East Jordan East Jordan City of East Jordan

Maple Street Water/Sewer Harbor Dredging

City of East Jordan

City of East Jordan

Culvert Replacement Mill Street

City of East Jordan City of East Jordan City of East Jordan City of East Jordan City of East Jordan City of East Jordan

City of East Jordan City of East Jordan City of East Jordan City of East Jordan East Jordan East Jordan

Vance & Pine Street Reconstruction and Infrastructure Watermain Under Jordan River Bridge Street Reconstruction Project Harbor Electric Airport Lighting Project Airport Runway Painting

City of East Lansing

City of East Lansing

City of East Lansing

d e t

PP

The City has several streets which are in dire need of attention. Thickstun Street and Andrew Street are on top of this list. This area of the city has a sanitary sewer system which is too shallow and has issues with freezing during the winter. This area of the city has a sanitary sewer system which is too shallow and has issues with freezing during the winter. The water main in this area is undersized and should be upgraded for better fire protection flow, as well as for reliability of the distribution system. A new storm water collection system needs to be installed. so that the current runoff can be adequately managed and increase the life cycle of the roadway. The utility reconstruction will require road replacement. The project will update the infrastructure in an area of the community which could certainly use it. The upgraded facilities will also create a sense of pride in the area and could facilitate update to some of the loca homes. The proposed new sidewalks will also create a sense of community and lead to better pedestrian movement in this area to the local park. The estimated cost for th Install new Water and Sewer Lines as well as Sewer Lift Station in Conjunction with MDOT Project 9/1/2009 Sewer Plant upgrade Dredging of the Harbor 4/1/2009 To Replace Culvert under Mill Street which is for Brown's Creek feeding the Jordan River 7/1/2009

s

t s e

Funding Request

D VE $

2,523,890

$

2,720,358

6/1/2009

$ $ $

800,000 400,000 75,000

8/1/2009

$

300,000

12/1/2009

Reconstruct Pine and Vance Streets. Deepening and Replacing Water and Sanitary Sewer. Install New Storm Sewer. New Road surface with wedge curb and gutter Replace 8" Water Line under Jordan River Bridge Pave, Crush and Shape Various City Streets Replace current electric at Harbor To replace existing lighting at the Airport To repaint the exisiting runways

7/1/2009 7/1/2009 6/1/2009 4/1/2009 6/9/2009 6/9/2009

10/1/2009 8/1/2009 8/1/2009 6/1/2009 9/9/2009 7/9/2009

$ $ $ $ $ $

Evergreen Water Main

Replace/Upgrade Existing Water Main

7/1/2009

11/30/2009

$

City of East Lansing

Kensington Water Main

Provide Water Main Loop & Replace Exist. Main

7/1/2009

11/30/2009

$

City of East Lansing City of East Lansing

City of East Lansing City of East Lansing

Collingwood Water Main Durand Water Main

Provide Water Main Loop & Replace Exist. Main Replace/Upgrade Existing Water Main

7/1/2009 7/1/2009

11/30/2009 11/30/2009

$ $

City of East Lansing City of East Lansing

City of East Lansing City of East Lansing

Oakwood Area Water Main Berkshire/Kings Ct Water Main

Replace/Upgrade Existing Water Main Provide Water Main Loop & Replace Exist. Main

7/1/2009 7/1/2009

11/30/2009 11/30/2009

$ $

City of East Lansing

City of East Lansing

Foxcroft Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

tt i m

ub

S

02262009

Route (Infrastructure Only)

O N

qu

e R

Expected Completion Date

Submitted Requests - Not Approved

M-66 to Elizabeth 600,000 St. 80,000 300,000 125,000 37,000 25,081 Oakhill N to Exist. 243,000 Main Grand River to 616,000 Michigan Grand River to 865,000 Burcham 261,000 Linden to Snyder North of Grand 488,000 River 245,000 Burcham to Alton Applegate to Lake 252,200 Lansing

87 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only) Hagadorn to N City Limits Cambria to N. City Limits Ramblewood to N End Rolling Brook to Green Tree Ramblewood to Red Leaf

City of East Lansing

City of East Lansing

Cambria Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

222,800

City of East Lansing

City of East Lansing

Smithfield Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

55,800

City of East Lansing

City of East Lansing

Rolling Brook Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

183,700

City of East Lansing

City of East Lansing

Red Leaf Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

211,400

City of East Lansing

City of East Lansing

Green Tree Street Improvements

Rebuild Existing Local Street

7/1/2009

$

53,400

City of East Lansing

City of East Lansing

Harvard Street Improvements

Rebuild Existing Local Street

7/1/2009

$

95,500 Coolidge to Cowley

City of East Lansing

City of East Lansing

Cowley Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Gilcrest Street Improvements

Rebuild Existing Local Street

PP

11/30/2009

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Bainbridge Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Rosewood Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Woodingham Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Pine Forest Street Improvements

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Rebuild Existing Local Street

7/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

7/1/2009

12/31/2009

$

200,000

City of East Lansing

City of East Lansing

Spruce Hill Street Improvements Green Enhancements to the Department of Public Works Green Enhancements to the Department of Public Works

111,600 Roxburgh to E End Bainbridge to 61,400 Gainsborough Harrison to Spruce 171,000 Hill Saginaw to 139,900 Harrison Pine Forest to 101,500 Woodingham

7/1/2009

12/31/2009

$

75,000

City of East Lansing

City of East Lansing

Green Infrastructure for Parking System

7/1/2009

12/31/2009

$

400,000

A T

s

st

e u

Solar PV array at DPW facility

O N

Installation of wind turbine Roof-mounted solar panels, wind turbine, electric vehicle charging stations, LED lighting

eq

R d

O R 11/30/2009

D VE

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

East Village Infrastructure Downtown Technology Enhancements City Center II Theater City Center II Exhibition Space Hannah Community Center 3rd Floor 210 Michigan Ave.

Bury utility lines Expand boradband infrastructure in downtown Construction of 400-seat performing arts theater Construction of 10,000 museum exhibition space renovate 3rd floor at Hannah Community Center Brownfield site redevelopment

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

12/31/2009 6/30/2010 6/30/2011 6/30/2011 6/30/2011 6/30/2010

$ $ $ $ $ $

City of East Lansing

City of East Lansing

Columbine Street Improvement

Rebuild Existing Local Street

6/1/2009

9/30/2009

$

City of East Lansing

City of East Lansing

Glenhaven Street Improvements

Rebuild Existing Local Street

6/1/2009

9/30/2009

$

City of East Lansing

City of East Lansing

Harrison Road Water Main

Replace/Upgrade Existing Water Main

6/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Stoddard/Cornell Water Main

Provide Water Main Loop & Replace Exist. Main

6/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Flowerpot/Ivanhoe Water Main

Replace/Upgrade Existing Water Main

6/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Coleman Road Extension

Construct New Roadway

6/1/2009

11/30/2009

$

City of East Lansing

City of East Lansing

Kalamazoo Road Pavement Project

Rebuild Existing Roadway

6/1/2009

11/30/2009

$

i m

ub

S

02262009

e t tt

Submitted Requests - Not Approved

64,200 Saginaw to N End Woodingham to N 202,600 End

M-43 Grand River (Bogue to 1,200,000 Hagadorn) 200,000 1,500,000 1,000,000 350,000 435,000 Loree to 67,800 Bessemaur Woodingham to 191,500 Gainsborough Michigan to 350,000 Trowbridge Grand River to 1,165,000 Burcham Hicks to 689,000 Trowbridge West Road to 3,900,000 Wood Street Harrison to W City 564,100 Limits

88 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Provide Storm Drainage and Road Improvements

6/1/2009

11/30/2009

Route (Infrastructure Funding Request Only) Abbey to County $ 700,000 Line $

2,500,000 Various Locations

$

750,000 Grand River Ave.

$

Michigan Avenue from Grand River 500,000 to city boundary

Project Description

Start Date

Expected Completion Date

City of East Lansing

City of East Lansing

Project Name West Road Pavement & Drainage Improvements

City of East Lansing

City of East Lansing

LED Street Lights

Upgrade street light lamps to LED

7/1/2009

6/30/2010

City of East Lansing

City of East Lansing

Downtown Sidewalk Improvements

Reconstruction from Abbot to Collingwood

7/1/2009

11/30/2009

City of East Lansing

City of East Lansing

Michigan Avenue Streetscape

Street and streetscape improvements

7/1/2009

City of East Lansing City of East Lansing

City of East Lansing City of East Lansing

Wayfinding Design/Build Contract Rental Weatherization Porgram

Signage - expressways, parking structures, downtown pedestrian signage Matching grant pogram for weatherization improvements

7/1/2009 7/1/2009

City of East Lansing

City of East Lansing

Harrison Road Pavement Project

Rebuild Existing Roadway

City of East Lansing

City of East Lansing

Harrison Road Pavement Project

Rebuild Existing Roadway

City of East Lansing

City of East Lansing

Mt Hope Road Pavement Project

Rebuild Existing Roadway

City of East Lansing

City of East Lansing

Saginaw Street Non-Motorized Pathway

Construct 8' Wide Non-Motorized Pathway Both Sides of Street

City of East Lansing

City of East Lansing

Bogue Street Bridge Repair

Rehabilitation of Deck and Appurtenanaces

City of East Lansing

City of East Lansing

Bessemaur Street Improvements

Rebuild Existing Local Street

City of East Lansing

City of East Lansing

Roseland Street Improvements

Local Street Resurfacing

City of East Lansing

City of East Lansing

Oakland Street Improvements

Local Street Resurfacing

City of East Lansing

City of East Lansing

Maplewood Street Improvements

Local Street Resurfacing

City of East Lansing

City of East Lansing

Ridgewood Street improvements

Local Street Resurfacing

City of East Lansing

City of East Lansing

Whitehills Street Improvements

City of East Lansing

City of East Lansing

Old Hickory Street Improvements

City of East Lansing

City of East Lansing

Lantern Hill Street Improvements

City of East Lansing

City of East Lansing

Wick Court Street Improvements

City of East Lansing

City of East Lansing

City of East Lansing

City of East Lansing

City of East Lansing

11/30/2009

D VE

6/1/2009

O R 11/30/2009

$

6/1/2009

11/30/2009

$

6/1/2009

11/30/2009

$

7/1/2009

6/30/2010

$

6/1/2009

11/30/2009

$

6/1/2009

9/30/2009

$

6/1/2009

9/30/2009

$

6/1/2009

9/30/2009

$

6/1/2009

9/30/2009

$

6/1/2009

9/30/2009

$

Local Street Resurfacing

6/1/2009

9/30/2009

$

Local Street Resurfacing

6/1/2009

9/30/2009

$

Local Street Resurfacing

6/1/2009

9/30/2009

$

Local Street Resurfacing

6/1/2009

9/30/2009

$

Knoll Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

Oxford Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

City of East Lansing

Sabron Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

City of East Lansing

City of East Lansing

Sunset Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

City of East Lansing

City of East Lansing

Gilcrest Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

City of East Lansing

City of East Lansing

Greenview Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

City of East Lansing

City of East Lansing

Mt Vernon Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

m b u

S

02262009

-N

e u

eq

R d

e t t

it

s t s

T O

Submitted Requests - Not Approved

P P A

6/30/2010 6/30/2010

$ $

500,000 1,000,000

Mt Hope to 850,000 Trowbridge Trowbridge to 900,000 Kalamazoo W City Limits to E 826,400 City Limits Coolidge to 2,300,000 Stonegate Over Red Cedar 220,000 River 290,600 Abbot to Colorado Hagadorn to E City 103,200 Limits Grand River to 106,400 Roseland Grand River to 104,100 Roseland Hagadorn to E of 126,400 Wood 230,900 E of Abbot to Alton Saginaw to N of 87,200 Cambria Burcham to N of 131,500 Knoll Lantern Hill to N 19,700 End Burcham to 51,300 Lantern Hill Abbot to W of 100,300 Sunset Saginaw to 45,500 Clarendon Saginaw to 84,500 Northlawn Woodingham to S 54,000 of Gainsborough Woodingham to 64,600 Gainsborough Hagadorn to 143,900 Moorland

89 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

City of East Lansing

City of East Lansing

Linden Street Improvements

Local Street Resurfacing

6/1/2009

9/30/2009

$

201,100

City of East Lansing City of East Lansing City of East Lansing

City of East Lansing City of East Lansing City of East Lansing

Lilac Street Improvements Daisy Street Improvements Larspur Street Improvements

Local Street Resurfacing Local Street Resurfacing Local Street Resurfacing

6/1/2009 6/1/2009 6/1/2009

9/30/2009 9/30/2009 9/30/2009

$ $ $

141,600 169,200 53,000

City of East Lansing City of East Lansing City of East Lansing

City of East Lansing City of East Lansing City of East Lansing

Narcissus Street Improvements Hicks Street Improvements Rowena Street Improvements

Local Street Resurfacing Local Street Resurfacing Local Street Resurfacing

6/1/2009 6/1/2009 6/1/2009

9/30/2009 9/30/2009 9/30/2009

$ $ $

76,000 45,600 33,200

City of East Lansing City of East Lansing

City of East Lansing City of East Lansing

Scott Street Improvements Rebecca Street Improvements

Local Street Resurfacing Local Street Resurfacing

6/1/2009 6/1/2009

9/30/2009 9/30/2009

$ $

28,300 32,600

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

Sanitary Sewer Rehabilitation Former Public Work Site Downtown Reforestation Reclamation of Ash Borer Trees Bailey AHU Bailey Cabinet Unit Heaters Bailey Door Replacement Bailey High Efficiency Lighting Bailey Roof Replacement City Hall ADA Handrails City Hall AHU City Hall Energy Management City Hall Entry Doors City Hall Freight Elevator City Hall High Efficiency Lighting City Hall Sensor Faucets City Hall Strobes City Hall Trash Compactor Fire Station AHU Fire Station Air Condenser Unit Fire Station Door Closure Sensors Fire Station Energy Management Fire Station High Efficiency Lighting

Sanitary Sewer Lining/Bursting & Manhole Rehab Demolition and site remediation to prep for private developmen Downtown Reforestation Replace 600 trees @$300/tree Replace gym air handling unit at Bailey Community Cente Rebuild Bailey Cabinet Unit Heaters Replace interior double doors at Bailey Community Cente Replace interior lights with high efficiency lights at Bailey Community Cente Roof Replacement at Bailey Community Center Install ADA handrail at City Hal Replace City Hall air handling unit and AHU-2 Install automated energy mamagement system at City Hal Replace Police and Court entry doors at City Hal Replace freight elevator at City Hal Replace existing City Hall lighting with high efficiency lighting Install sensor faucets at City Hall Sychronize Strobes at City Hal Replace trash compactor at City Hall Replace main and kitchen air handling unitss at the Fire Station Replace Fire Station Air Condenser Unit Install automatic overhead door closure sensors at Fire Station Install automated energy mamagement system at Fire Station Replace Fire Station interior and exterior lighting with high efficiency lighting

6/1/2009 6/1/2009 4/1/2009 4/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

12/31/2009 7/31/2009 6/30/2009 6/30/2010 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

Fire Station Truck Bay and Interior Lighting Fire Station Truck Bay Heater Hannah Back-up Generator Hannah Elevator Piston Boot Hannah Fire Alarm Pane Hannah Front Door Replacement

Install new truck bay and interior high efficiency lighting at Fire Station Replace Fire Station truck bay heater Back-up Generator for Hannah Community Center Install piston boot on Hannah service elevator Replace fire alarm panel at Hannah Community Cente Replace front door at Hannah Community Center

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009

$ $ $ $ $ $

16,000 8,000 60,000 16,000 41,000 25,000

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing City of East Lansing

Hannah High Efficiency Lighting Hannah Pool Dehumidifyer Hannah Roof Replacement Hannah Tuck Pointing Library AHU Library Energy Management System Library Fire Alarm System Library Carpet Replacement

Replace existing Hannah lighting with high efficiency lighting (pool & gymnasium Install dehumidifier at Hannah Community Center poo Replace roof sections N,O,A,A1 at Hannah Community Center Tuck-Pointing Hannah Community Center brick Replace two air handling units at the Library Install automated energy mamagement system at Library Upgrade Library Fire Alarm System CRI green label carpet replacement at the Library

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009 12/31/2009

$ $ $ $ $ $ $ $

34,000 50,000 235,000 46,000 24,000 44,000 36,000 65,000

City of East Lansing

City of East Lansing

Albert Avenue Improvement

Rebuild and Realign Local Street (City Center II project)

5/1/2009

7/31/2009

$

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

T O

P P A

Submitted Requests - Not Approved

O R

D VE

Route (Infrastructure Only) Hagadorn to Timberlane Narcissus to W End Lilac to W End Marigold to S End Marigold to S of Daisy Marigold to Daisy Ivanhoe to Scott Rebecca to Rowena Scott to Ivanhoe

1,000,000 Various Locations 2,000,000 20,000 180,000 20,560 36,000 30,000 31,000 67,000 12,500 108,000 40,000 30,000 20,000 142,400 9,500 10,000 30,000 21,150 30,000 10,000 42,000 35,000

2,500,000 Abbot to Evergreen

90 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City of East Lansing

City of East Lansing

Avondale Square

City of East Lansing

City of East Lansing

City of East Lansing

Project Description

Start Date

Expected Completion Date

Construction of alleys, parks, and street surfacing

4/1/2009

5/30/2009

Board of Water & Light Building Rehabilitation Renovation of historic building for public space

6/1/2009

7/31/2009

City of East Lansing

Division Street Parking Garage Improvements Structural and surface repairs

6/1/2009

11/30/2009

City of East Lansing

City of East Lansing

Grove Street Parking Garage Improvements

Structural and surface repairs

6/1/2009

11/30/2009

City of East Lansing City of East Lansing City of East Tawas

City of East Lansing City of East Lansing East Tawas, Michigan

University Place - East Plaza Improvements Downtown Technology Enhancements Washing & River St Intersection

6/1/2009 5/1/2009 10/1/2009

City of East Tawas

East Tawas, Michigan

Tawas Beach Road

Reconstruction and renovation of public plaza Technology Innovation Center expansion Same as above. Realign intersection. Insufficient funds last application Hot mix asphalt resurfacing from Sawyer St to Tawas River. Crush & shape, cold milling, drainage & stop restoration work.

City of East Tawas

East Tawas, Michigan

Sanitary Sewer rehabilitation, Phase I

City of East Tawas

East Tawas, Michigan

Library

Rehabilitate 70-year old sewer distribution system 7,500 Sq Ft library in central business district, "green" project w/ rain gardens, increased high tech center

Improve business access, storm drainage, sewer, lighting, reconstruct & resurface road, add parking, landscaping, roundabouts & reduce lanes (calm traffic), add bike lane.

T O

City of East Tawas

East Tawas, Michigan

US-23 Improvement

City of East Tawas

East Tawas, Michigan

City of East Tawas

East Tawas, Michigan

Harbor Park Streetscape East Tawas parking lots, insufficient funding

City of East Tawas City of East Tawas

East Tawas, Michigan East Tawas, Michigan

Heritage Rte Multi-use / Bikepath Extension Community Center generator

City of East Tawas

East Tawas, Michigan

City of East Tawas

East Tawas, Michigan

Bridge & State St East Tawas City Park campsite electrical upgrade

City of East Tawas

East Tawas, Michigan

Housing Commision rehabilitation

City of Eastpointe

City of Eastpointe

Water Meter/PRV Pit

City of Eastpointe

City of Eastpointe

Water Meter/PRV Pit

tt i m

d e t

s t s

e u

q e R

Hot mix asphalt resurfacing from Sawyer St to Tawas River. Crush & shape, cold milling, drainage & stop restoration work. Insufficient funds to complete.

Upgrade electrical to 174 RV campsites

Rehabilitate existing 44 unit, low income, senior citizen housing complex Install a new water meter and PRV on an existing 20" water main that feeds the City from the DWSD system. Install a new water meter and PRV on an existing 24" water main that feeds the City from the DWSD system.

D VE

300,000

$

490,000

$

160,000

$ $ $

400,000 550,000 50,000

5/1/2010 7/1/2010 Fall 2009 / Spring 2010 Fall 2011

$

225,000

$

4,000,000

5/15/2009

11/15/2009

$

1,700,000

6/15/2009

Fall 2010

$

2,500,000

questionable

$

450,000

4/15/2009

7/1/2009

$

200,000

5/1/2009 5/01/20089

7/15/2009 6/1/2009

$ $

225,000 80,000

5/15/2009

5/31/2009

$

160,000

5/1/2009 6/15/2009 Fall 2009 / Spring 2010 Fall 2011

$

350,000

$

250,000

7/1/2009

1/1/2010

$

8 Mile and Kelly 550,000 Roads

7/1/2009

1/1/2010

$

600,000 8 Mile and Gratiot

7/1/2010

$

9/15/2009

$

10 Mile Road at 1,300,000 Schroeder North of Oak, East 550,000 of Gratiot

11/15/2010

$

5,500,000 City Wide

Create "green" space , upgrade electrical, add bandshell & stage for performing arts, improve storm drainage, sewer & lighting adjacent to DNR State dock 6/1/2009 Reconstruct, resurface, landscape, drainage, lighting, pocket park 1 mile extension to connect Regional Pathway System in East Tawas to continue northbound Upgrade old community center generator

Avondale from 450,000 Burcham to Snyder

$ $

O R

P P A

-N

Funding Request

Route (Infrastructure Only)

7/31/2009 7/31/2009 11/1/2009

City of Eastpointe

City of Eastpointe

Water Reservoir Upgrades

City of Eastpointe

City of Eastpointe

Library Parking Lot Reconstruction

City of Eastpointe

City of Eastpointe

Sanitary Sewer Repairs

Upgrade an existing water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows. 7/1/2009 Remove and replace existing 150 car parking lot including mail box drop off, lighting, landscaping, screen wall and bio-swale. 4/15/2009 Line and/or replace deteriorated sanitary sewer lines recently indentified by CCTV Inspection 4/15/2009

Wilmot Water Main Replacement

Replace an aged cast iron water main with a new 8" ductile iron water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

4/15/2009

8/15/2009

$

Stephens to 10 500,000 Mile

Cushing Avenue Water Main Replacement

Replace an aged cast iron water main with a new 8" ductile iron water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

4/15/2009

8/15/2009

$

9 Mile Road to 500,000 Stephens Road

City of Eastpointe

City of Eastpointe

b u S

City of Eastpointe

City of Eastpointe

02262009

Submitted Requests - Not Approved

91 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Eastpointe

City of Eastpointe

10 Mile Road Water Main Replacement

Replace an aged cast iron water main with a new 12" ductile iron water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

City of Evart

City of Evart

Lauman Rd. Improvements

Mill and replace existing pavement on Lauman Rd. from US-10 to Five Mile Road

6/1/2009

9/30/2009

City of Evart

City of Evart

Main St. Improvements

Mill and replace existing pavement through the central business district including Main Street from US-10 to Fifth Street and Main from US-10 to Ninth St. 6/1/2009

9/30/2009

Oak St. Improvements

Oak Street Improvements including replacement of existing sanitary sewer from Fourth to Jefferson Street, replacement of existing undersized water main from Fifth to Third Street and reconstruction of road pavement from Fifth to Jefferson Street.

6/1/2009

City of Evart

WWTP Safety and Operation Improvements

Wastewater treatment plant improvements including safety upgrades at aerated lagoons, influent sampling and grinding station, and control upgrade with SCADA system.

7/1/2009

City of Evart

Replace existing twin CMP culverts for Twin Creek at Pine St. & Ninth St. intersection, with twin concrete box culverts, concrete headwalls and replacement of road Twin Creek box culvert @ Pine St. and 9th St. pavement 9/1/2009

City of Evart

City of Evart

City of Evart

City of Evart

City of Evart

City of Farmington

4/15/2009

8/15/2009

D VE $

260,000 Main Street

11/15/2009

$

665,000 Oak Street

11/30/2009

$

450,000 Five Mile Road

6/1/2010

$

350,000 Pine St.

6/1/2010

$

5,714,562

11/30/2009

$

4,300,000

Trailer Mounted Hydroseeder

This involves the acquisition of a hydroseeder to equip staff with the means to restore barren soil following ditch cleanout operations and other construction-maintenance activities. Hydroseeding, as compared to traditional seed, straw and topsoil restoration, has many advantages including its ability to adhere to or stabilize soil, even during heavy downpours, and quickly germinate - accelerated rooting and soil retention. The ability to restore vegetation more quickly benefits the environment by reducing pollutant transport and also helps the City to address NPDES Phase II permit requirements. In addition, less staff time is necessary for hydroseeding over traditional seeding thereby freeing them up for other activities. The recommended uni for purchase would have a 2,500 - 3,500 gallon tank and discharge boom system (enabling hydroseeding over large areas), agitator (to keep the mix consistent), extended hose and rewind system. 5/1/2009

12/1/2009

$

40,000

Tree Replacement

This project consists of planting 300 trees ($400 per tree) on the city owned Farmington Hills Golf Course. These trees will replace trees that were lost during various construction activities and as a result of attack by the Emerald Ash Borer. Tree replacement will also demonstrate City support for the “Green Infrastructure” campaign in Southeast Michigan. Improving the tree canopy on City properties also supports the watershed plan developed for the Rouge River Watershed and addresses NPDES Phase II requirements. 5/1/2009

11/1/2009

$

120,000

Construction of an Airport Terminal Building with Start Up Industrial Park Tenant Office Space, A University Business Education Training Facility, Offices of the Evart Local Development Finance Authority, 10 additional new developed and platted lots on land recently acquired by the LDFA for expansion of the Evart Air Industrial Park (Note: only 2 small lots remain available for sale and development) 3/30/2009

N s

City of Farmington

Reconstruction of Grove Street along with Water Main Replacement and Streetscape Improvements. Provides for additional on-street parking. The Grand River Streetscape Component involves realigning the road geometrics to provide a safer environment for both motorists and pedestrians. This requires changing the curb Downtown Farmington Street Reconstruction alignment along Grand River and necessary drainage structures. Project includes and Streetscape Improvements asphalt mill and overlay, and streetscape improvements. 5/15/2009

t s e

qu

d e tt

t i m

ub

S

e R

Submitted Requests - Not Approved

O R

P P A

Evart Air Industrial Park Expansion Project

02262009

874,000 Gratiot to Flower 195,000 Lauman Road

City of Evart

City of Farmington Hills City of Farmington Hills

$ $

T O

City of Farmington Hills City of Farmington Hills

Funding Request

Route (Infrastructure Only)

92 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

Project Name

Vacuum Sweeper

Fleet Vehicle Replacement

This involves the replacement of 15 gas operated fleet vehicles ($25,000 per vehicle) with more energy efficient and environmentally friendly hybrid vehicles. Expected benefits include savings on fuel; education of staff on benefits and operation of hybrids; environmental (air and global warming); incentive to initiate training of staff involved in fleet maintenance. Acquisition of these vehicles will demonstrate City support of protecting the environment and encourage the use of alternatives to fossil fuel. 5/1/2009

Street Tree Program

This project is provides for replacement of trees along the City's rights-of-ways in areas whose green canopy has been damaged by the infestation of the Emerald Ash Borer. 8/1/2009

Heritage Park Handicap Amphitheatre Lot

Porous pavement allows water to infiltrate through it thereby reducing the volume/rate of storm water runoff and pollutants. Installation of porous pavement demonstrates City support and leadership in the use of environmentally friendly best management practices that improve and protect water quality. Reductions in winter salt application and associated costs have been experienced in other areas that utilize porous pavement. 9/1/2009

Founders Park Ballfield Lot

Porous pavement allows water to infiltrate through it thereby reducing the volume/rate of storm water runoff and pollutants. Installation of porous pavement demonstrates City support and leadership in the use of environmentally friendly best management practices that improve and protect water quality. Reductions in winter salt application and associated costs have been experienced in other areas that utilize porous pavement. 9/1/2009

02262009

T O

N s

st

e u

eq

P P A

O R 12/1/2009

Funding Request

D VE $

170,000

7/1/2009

$

375,000

11/1/2009

$

60,000

11/1/2009

$

168,000

11/1/2009

$

840,000

Porous pavement allows water to infiltrate through it thereby reducing the volume/rate of storm water runoff and pollutants. Installation of porous pavement demonstrates City support and leadership in the use of environmentally friendly best management practices that improve and protect water quality. Reductions in winter salt application and associated costs have been experienced in other areas that utilize porous pavement. 9/1/2009

11/1/2009

$

870,000

Heritage Park Playground Lot

Porous pavement allows water to infiltrate through it thereby reducing the volume/rate of storm water runoff and pollutants. Installation of porous pavement demonstrates City support and leadership in the use of environmentally friendly best management practices that improve and protect water quality. Reductions in winter salt application and associated costs have been experienced in other areas that utilize porous pavement. 9/1/2009

11/1/2009

$

972,000

I-275 Living Wall

This project is proposed on the east side of I-275 from Eight Mile to just south of Nine Mile. This is a demonstration project to show the feasibility of constructing a Living Wall to protect the abutting residential properties from traffic noise. The Living Wall was selected due to the site constraints along this route as well as provide an environmentally appropriate wall surface for the motorists and the abutting property owners. 6/1/2009

3/1/2010

$

5,314,000

R d

e t t

Founders Skate Park/ Soccer Lot

t i m

S

City of Farmington Hills City of Farmington Hills

Start Date

This involves the acquisition of a vacuum sweeper to equip staff with a means to collect fugitive road dust during road and parking lot cleaning operations. Vacuum sweepers are far superior to mechanical sweepers in capturing soluble pollutants and fines including phosphorous, zinc, lead, copper, brake, tire rubber, asphalt fragments, nitrates, sulfates, salt, and clay. A vacuum sweeper that is capable of removing additional pollutants from paved surfaces, and thereby preventing them from entering the storm water system, would help improve storm water quality and address the City’s NPDES Phase II permit requirements. Porous parking lot maintenance requires the use of a vacuum sweeper. 5/1/2009

ub

City of Farmington Hills City of Farmington Hills

Project Description

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

93 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Danvers Pond

This project consists of the removal of a failing dam and restoring the stream channel and floodplain to a self-sustaining ecologically friendly environment. Dam removal will allow for fish passage and eliminate the potential for downstream problems associated with a failure. Future maintenance costs associated with the existing impoundment will also be eliminated. 7/1/2009

City Hall Revitilization

Currently Farmington Hills’ City Hall, with its 14 separate HVAC systems, is an extremely energy inefficient building with an Energy Star Score of 38/100. The revitalization project will consist of a complete renovation and some new space making way for a more functional and efficient municipal building. With the use of a ground source heating and cooling system, more efficient lighting, daylighting, graywater reclamation, green roofs, renewable energy and many other sustainable design features, we are expecting large efficiency gains. Further, this project will be used to promote sustainable concepts throughout the community and region. Currently this project is tracking LEED NC Certification at the Gold Level.

7/1/2009

Drake Resurfacing, Nine Mile to Lytle

This concrete pavement will be rehabilitated using both crack and seat and overlay and fabric and overlay construction methods. This project will improve the ride ability of this segment of Drake Road. 5/1/2009

Halsted Resurfacing, 11 Mile to I-696 Bridge

Halsted Road was resurfaced from Grand River to 11 Mile Road last year. The bridge over I-696 is scheduled for replacement in the 2009 construction season. Resurfacing of this ! mile segment of roadway is needed at this time and can be done with the closure of the road for the Halsted Road Bridge Replacement. 5/1/2009

City of Farmington Hills City of Farmington Hills

Nine Mile Resurfacing, Gill to M5/Folsom

This project will rehabilitate the existing concrete pavement with slab replacement and diamond grinding. It is being constructed in cooperation with the City of Farmington that owns a portion of the roadway. 5/1/2009

City of Farmington Hills City of Farmington Hills

This project will upgrade an existing 8” watermain to a 12” watermain that has a history of numerous breaks. In addition, it will provide a redundant feed of appropriate size for the nearby Botsford Hospital. This includes a pice of main on 8 St Francis Watermain, 8 Mile to Independence Mile Rd.

City of Farmington Hills City of Farmington Hills

Replace Existing Watermain under Northwestern at 13 Mile Rd

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills

City of Farmington Hills City of Farmington Hills City of Farmington Hills City of Farmington Hills

tt i m

S 02262009

q e R

Upgrade Traffic Signals

P P A

N s

st

5/1/2009

The existing watermain crossing of Northwestern at Middlebelt has a history of leaks. Because of the large number of utilities in the Northwestern ROW, a new main would be bored and the old one abandoned. 9/1/2009

This project proposes to replace four existing, 20-year old traffic signals with modern, SCATS type traffic signals. These intersections include 9 Mile Rd/Halsted Rd, 13 Mile Rd/Halsted Rd, 13 Mile Rd/Drake Rd & 13 Mile Rd/Farmington Rd. These upgraded signals will allow more efficient traffic handling operations at these locations, reducing vehicle delay & fuel consumption while improving safety. The new signals will use LED lights reducing electricity consumption also. They will be constructed following the new "box span" requirements which also improves visibility and improves safety. 9/1/2009

Submitted Requests - Not Approved

10/1/2010

Funding Request

D VE $

500,000

1/1/2011

$

8,000,000

8/1/2009

$

330,000

8/1/2009

$

500,000

8/1/2009

$

650,000

8/1/2009

$

1,350,000

12/1/2009

$

200,000

12/1/2009

$

250,000

12/1/2009

$

390,000

9/1/2010

$

600,000

O R

The twin 48” drainage culverts under Fourteen Mile Rd at the Pebble Creek Drain nea Club House Lane are undersized and deteriorated and need to be replaced. The 14 Mile Culvert Replacement at Pebble Creek preliminary plan calls for replacement with a 5’x 9’ box culvert. 9/1/2009 When this watermain breaks traffic is affected on Thirteen Mile Road. By increasing 13 Mile Watermaineast of Lorikay the size it will also provide better fire hydrant flows to the area. 9/1/2009

ub

City of Farmington Hills City of Farmington Hills

d e t

T O

e u

Expected Completion Date

Route (Infrastructure Only)

94 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Replace Existing Watermain in Old Homestead Subdivision

This entire subdivision has watermain that is undersized for proper fire protection and service and has suffered many watermain breaks. Replacing the existing watermain that was originally installed in the 1960's will eliminate the breaks and improve water service to the entire subdivision. 9/1/2009

City of Farmington Hills City of Farmington Hills

Replace Existing Watermain in Kendallwood Subdivision No 1

This entire subdivision has watermain that is undersized for proper fire protection and service and has suffered many watermain breaks. Replacing the existing watermain that was originally installed in the 1950's will eliminate the breaks and improve water service to the entire subdivision. 9/1/2009

City of Farmington Hills City of Farmington Hills

Farmington Freeway Business Park Street Replacement

The major roads in the Farmington Freeway Business Park have deteriorated to the point where patxhing is no longer possible. This project replaces the roads and maintains the viability and attractiveness of a premiere office park.

City of Ferrysburg City of Ferrysburg

City of Ferrysburg City of Ferrysburg

Sanitary Sewer Upgrade Lift Station

Upgrade sanitary sewer pipe that is at capacity and serves two (2) communities Rebuild pumps, add variable speed drives, upgrade controls

City of Ferrysburg

City of Ferrysburg

Construct new energy efficient DPW garage with salt barn. Site plan reviewed by Department of Public Works Garage/Salt Barn Planning Commission, approved by City Council. Property is City-owned.

City of Farmington Hills City of Farmington Hills

City of Ferrysburg

City Hall Project

City of Flint

Flint

Genesee Valley Trailway - City of Flint

City of Flint

Flint

Grand Traverse Greenway

City of Flint

City of Flint City of Flint

Flint

Kettering Gateway Project

d e tt

Flint Flint

City of Flint

Flint

City of Flint

Flint

City of Flint

Flint

City of Flint City of Flint City of Flint City of Flint City of Flint

Flint Flint Flint Flint Flint

02262009

t i m

S

ub

The City of Flint Police Department Vehicle Purchase Software Upgrade at the Water Service Center Energy Efficent Heating/Cooling for the City Fire Dept Weatherization/Energy Efficiency Improvements Pump Station #3 Upgrade Water Valve Replacements Public Housing Renovations Comercial Demolition

st

D VE

3,600,000

$

5,350,000

11/1/2010

$

6,000,000

7/1/2009 7/1/2009

12/1/2009 12/1/2009

$

North Shore Road 1,000,000 to Lift Station #1 Lift Station No. 1

5/1/2009

11/1/2009

$

1,750,000

10/1/2009

$

5,000,000

9/30/2009

$

O R

PP

9/1/2009

Construct new energy efficient LEED designed City Hall, renovate existing school structure. The gymnasium would be used for community events. The site would also contain areas for public gatherings, e.g. farmers market, concerts, ice rink. Site plan reviewed by Planning Commission, approved by City Council. Property is City-owned 2/17/2009 Construction of a regionally significant non-motorized pathway connecting to existing paths in the City of Flint 4/1/2009 Construction of a regionally significant non-motorized pathway connecting to existing paths in the City of Flint 4/1/2009

8/1/2011

9/30/2009

$

Riverbank Park to 500,000 City Limits Riverbank Park to 1,300,000 Hemphill

Construction of a gateway route from I-69 at Hammerberg Road to Chrevolet Avenue providing a direct route to Kettering University in the City of Flint. Including reconfiguration of existing roadway to facilitate a direct route and corridor enhancements. 4/1/2009

9/30/2010

$

Hammerberg Rd to 1,200,000 Chevrolet Ave

The City of Flint Police Department needs to develop a location for required firearms qualification and training. This location shall be made available to neighboring jurisdictions for the same purpose for a collaborative effort. Currently there is no local avenue to conduct this necessary training. 9/1/2009 Naturalize and restore Flint River fish passage at Hamilton Dam 9/9/2009

9/30/2010 9/30/2010

$ $

5,000,000 N/A 1,500,000 N/A

The City of Flint Police Department through this program shall enhance and replace where necessary the existing aging vehicle fleet that is tasked with first response duties. The Police Department Leadership is committed to purchase locally manufactured vehicles and support Michigan produced products.

3/1/2009

9/30/2010

$

3,000,000 N/A

Upgrade to the work order software that dispatches work to City employees. Restore and Update for efficency the heating and cooling system for the City Fire Department Primary Station #1.

5/1/2009

12/31/2009

$

100,000 N/A

5/1/2009

12/31/2009

$

500,000 N/A

Rehab homes city wide to improve energy efficiency Switch gear and pump replacement at Water Treatment Plant. Replace broken water distribution valves City wide Ren;ovations to Business Incubator Facility Demolition of commerical structures Citywide.

5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009

9/30/2010 12/31/2009 9/30/2010 9/30/2010 9/30/2010

$ $ $ $ $

e u

q e R

City of Flint Fire Arms Training Range Flint River Naturalized Fish Passage

s

O N

8/1/2011

Funding Request

Route (Infrastructure Only)

$

A T

City of Ferrysburg

Expected Completion Date

Submitted Requests - Not Approved

1,000,000 1,200,000 2,000,000 2,000,000 2,000,000

N/A N/A N/A N/A N/A

95 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Flint Flint City of Flint Flint City of Flint Flint City of Flint Flint

Project Name Windcliff Village Rowe Building Lofts Construction City Hall Energy Efficency Improvements Oak Business Renovations

Project Description New construction of homes in Windcliff Village Complete construction of lofts in Rowe Building City Hall improvement according to completed energy audit. Renovations to Business Incubator Facility

Start Date 5/1/2009 5/1/2009 5/1/2009 5/1/2009

The City of Flint Police Department currently lacks the ability to communicate with surrounding jurisdictions. The inability to communicate with mutual aid partners hampers response where swift action promises a safer community. The program shall purchase and adopt an 800 Mhz. communications platform that will ensure interoperability among collaborative community partners. Security improvements at the Waste Water Treatment Plant Waste Water Treatment Plant pump station replacement. Replace chlorine and chemical based wastewater disinfection system with safer ultraviolet light based system Waste Water Treatment Plant incinerator stack renovation Purchase 3 homes; lease to those leaving shelter

7/1/2009 5/1/2009 5/1/2009

Improve internal roadway system Rental housing near Wood Ave. and M.L. King Blvd. Waste Water Treatment Plant sludge disposal Installation of backflow preventers/sump pumps to prevent flooding

City of Flint City of Flint City of Flint

Flint Flint Flint

City of Flint City of Flint City of Flint

Flint Flint Flint

City of Flint City of Flint City of Flint City of Flint

Flint Flint Flint Flint

CITY OF FLINT POLICE DEPT. Interoperable Communications Project Security Improvements Sewage Pump Station #6 WasteWater Treatment Plant Disinfection Improvements Incinerator Stack Renovation Acquisiton /Rehab/Resale Waste Water Treatment Plant Roadway improvements Metawananee Vineland Village Sludge Storage Improvements Backflow Preventers

City of Flint

Flint

Illegal Dumping Enforcement

Monitor hot spots for illegal dumping, patrol, advertise, ticket and enforce City code.

City of Flint

City of Flint

Flint

Flint

D VE

9/30/2010 9/30/2010 1/31/2010

$ $ $

120,000 150,000 N/A 240,000 N/A

5/1/2009 5/1/2009 5/1/2009 5/1/2009

9/30/2010 1/31/2010 9/30/2010 12/31/2009

$ $ $ $

250,000 400,000 750,000 800,000

5/1/2009

9/30/2010

$

800,000 N/A

City of Flint Police Activities PAL Program

This is a program designed for the City's youth population. This program shall be designed and implemented to steer our youth towards positive activity and away from long term crime. This endeavor shall also foster community police relationships. 5/1/2009

9/30/2010

$

1,000,000 N/A

Harvest Trees in Flint Parks

Remove dying trees and thin out forests to promote healthy growth within the City of Flint Parks. Also, replant young trees that promote the reasonable sized trees and offering necessary shade to the park area. This offers the citizens an improved park setting and invites families of all age to use and enjoy the City of Flint Parks and Recreation areas. 5/1/2009

9/30/2010

$

1,000,000 N/A

Replace/repair fishing piers along Flint River; restore wildlife natural habitat to improve the fishing opportunity along the Flint River and to be inviting to the community to participate in fresh water fishing. 5/1/2009 Inspections to identify health/safety issues. 5/1/2009 Dam removal and construction of a pedestrian bridge. 5/1/2009

10/30/2009 1/31/2010 12/31/2009

$ $ $

1,000,000 N/A 1,020,000 N/A 1,300,000 N/A

12/31/2009 12/31/2009 9/30/2010 9/30/2010 9/30/2010

$ $ $ $ $

1,400,000 2,000,000 2,000,000 2,000,000 2,000,000

9/30/2010 9/30/2010

$ $

2,000,000 N/A 3,000,000 N/A

9/30/2010

$

3,000,000 N/A

12/31/2009

$

3,000,000

e u

st

eq

s

A T

O N

PP

5/1/2009 5/1/2009 5/1/2009

R d

City of Flint Fishing Pier Reconstruction Code Enforcement/ 68th District Court Utah Dam Removal

City of Flint City of Flint City of Flint City of Flint City of Flint

Flint Flint Flint Flint Flint

William Street reconstruction Torrey Road Booster Station Acquisition/Demolition in Flood Plain Weed and Trash Abatement Bel-Aire Woods

City of Flint City of Flint

Flint Flint

City of Flint

Flint

02262009

Funding Request 3,000,000 3,200,000 5,000,000 2,600,000

5,000,000 100,000 N/A 100,000 N/A

Flint Flint Flint

Flint

O R

e t tt

i m

Owner Occupied Rehab

Infrstructure Improvements in Flint Homeownership Zone area. 3/1/2009 Water distribution improvements to General Motors facilities 5/1/2009 Purchase of structures located in flood plain; relocation/demolition 5/1/2009 Cut weeds/tall grass city wide, mow parkways and remove dumping 5/1/2009 New construction and rehabilitation on Cloverlawn and Home Ave 5/1/2009 Expand existing Citywide emergency repairs program to replace roofs, furnaces, other emergency housing situations. 5/1/2009 Purchase of surveillance cameras for City wide application 5/1/2009 Expand existing owner occupied rehab programs to inculude energy efficiency improvements 5/1/2009

River Bank Park

Upgrade the River Bank Park water pumping system and improve the recreational use of the park with natural habitat restoration and fish passage. This project is critical as the catalyst to draw business, University of Michigan-Flint, Kettering University, Mott Community College, Baker College students' and community activities to the City of Flint downtown area as an economic stimulus. 5/1/2009

b u S

Emergency Repairs City Wide Surveillance Camera Purchase

Submitted Requests - Not Approved

9/30/2010 12/31/2009 9/30/2010

$ $ $ $

Route (Infrastructure Only) N/A N/A N/A N/A

$ $ $

City of Flint City of Flint City of Flint

City of Flint

Expected Completion Date 9/30/2010 9/30/2010 9/30/2010 9/30/2010

N/A N/A N/A N/A

From Saginaw St. to M.L. King Blvd. Van Slyke Road N/A N/A N/A

96 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Flint Flint City of Flint Flint City of Flint Flint City of Flint Flint City of Flint

Flint

Project Name Water Main Replacements University Ave. Pumping Station Sanitary Sewer Repairs HAMILTON DAM REPLACEMENT City of Flint Police Department Building Renovation and Security

Project Description Replace water mains city wide to prevent breaks and flooding Electrical upgrade of pumping station. Repair leaking sanitary sewers throughout the City Dam replacement as safety is our over riding priority Improve the build energy efficency and security. Also upgrade to meet building code and especially ADA compliance.

City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint City of Flint

Flint Flint Flint Flint Flint Flint Flint Flint Flint Flint Flint Flint

LAW ENFORCEMENT HIRING INiTIATIVE Water Plant Upgrade Water Plant Upgrade Genesee Valley Trailway Fenton Road Bridge Grand Traverse Greenway Grand Traverse Bridge Robert T. Longway Bridge Kearsley Park Blvd. Bridge Saginaw Street Bridge Second Ave. Bridge West Second Street Bridge

City of Flint

Flint

City of Flushing City of Flushing City of Flushing

City of Flushing City of Flushing City of Flushing

I-69 Sound Wall WASTEWATER TREATMENT PLANT UPGRADES FIRE HALL UPGRADES AMBULANCE BUILDING RENOVATIONS

City of Flushing

City of Flushing

FIBER LINK UTILITY UPGRADE

City of Flushing

City of Flushing

MULTI-USE TRAILWAY

City of Flushing City of Flushing

City of Flushing Flushing City

d e t

SANITARY SEWER UPGRADES Canoe Launch

itt

m b u

S City of Frankenmuth

City of Frankenmuth

02262009

Frankenmuth Dam Project

Start Date 5/1/2009 5/1/2009 5/1/2009 5/1/2009

Expected Completion Date 9/30/2010 9/30/2010 9/30/2010 9/30/2010

$ $ $ $

Funding Request 4,000,000 4,000,000 4,000,000 6,000,000

5/1/2009

9/30/2010

$

6,000,000

6/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010

$ $ $ $ $ $ $ $ $ $ $ $

10,000,000 15,000,000 25,000,000 700,000 1,000,000 1,300,000 1,500,000 1,500,000 1,500,000 1,500,000 2,000,000 3,400,000

9/30/2010

$

4,000,000

4/31/2010 5/20/2009 11/20/2009

$ $ $

1,750,000 30,000 100,000

5/4/2009

$

180,000

11/14/2009

$

795,000

8/31/2014 7/15/2009

$ $

12,300,000 90,000

7/31/2010

$

2,400,000

The City of Flint Police Department is requesting funds to hire additional police officers to enhance crime fighting and crime prevention. This request is in response to recently difficult economic conditions. This project will enable the City to hire a total of 110 Police Officers and strengthen the fine City of Flint Police work. This is supportive of the Police Department Mission Statement "providing a safe community to live, work and visit!" 7/1/2009 Upgrade Water Plant to treat Port Huron raw water source 5/1/2009 Upgrade Water Plant to treat Flint River water source 5/1/2009 Design and construct Genesee Valley Trailway 5/1/2009 Replace Bridge over Thread Creek. 5/1/2009 Design and construct 1.3 miles of Grand Traverse Greenway 5/1/2009 Replace Bridge over Thread Creek. 5/1/2009 Replace Bridge over Gilkey Creek. 5/1/2009 Replace bridge over Gilkey Creek. 5/1/2009 Replace bridge over Flint River 5/1/2009 Replace bridge over Swartz Creek. 5/1/2009 Replace bridge over Swartz Creek 5/1/2009 Neighborhood Sound Wall from Center Road to Dort Hwy. Along the north side of I69. 5/1/2009 Upgrades to the city's WWTP including: grit handling, pumping, controls,emergency bypass, backup power, metering, and digester cover. 7/20/2009 Upgrade existing heating system in the city's fire hall 4/20/2009 Upgrade brick façade and HVAC system in the existing ambulance building 4/20/2009 Connection of community broad band fiber optic from the public school system to City Hall and Department of Public Works facilities. 4/1/2009 Construct 10' wide bituminous pathway connecting Riverview Park to Windmill Point Subdivision. 7/20/2009

T O

N s

st

e u

q e R

P P A

Upgrade storm sewer outfalls (15,000'); Complete footing drain connections to the city's storm sewer system for 2000 homes; rehabilitate existing sanitary sewer river crossings by pipe lining. Installation of new Canoe Launch on Flint River

7/20/2009 4/15/2009

The Project is a capital improvement project designed to modify the Frankenmuth dam, enabling fish passage on the Cass River. The project places rock material immediately downstream of the existing dam to create a gradual slope. Modifying the Frankenmuth dam re-establishes the free flow of water over the dam, opening up approximately 73 miles of fish spawing area. This action supports the restoration of certain Great Lakes fish populations including walleye and lake sturgeon. This project completes an important step in the MDNR Walleye Recovery Plan, received a high priorty rating by the Great Lakes Fisher Commission and is rated the highest priority fisheries restoration/dam project in Michigan by the US Corps of Engineers. The project supports enhanced recreation opportunities and tourism while stimulating the local economy, provides an exceptional opportunity for environmental education and exposes hundreds of thousands of visitors to the environmental value of the Great Lakes and our water quality. The project is of interest to the MDNR and Corps of Engineers (Detroit Office). 8/1/2009

Submitted Requests - Not Approved

O R

D VE

Route (Infrastructure Only) N/A N/A N/A N/A

97 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

Project Name

Harlan Drive Storm Relief Drain

Memorial Park Street and Parking Improvements

This project provides for improved street access, parking and handicap accessiblility servicing a City Park, Ampitheater and the local school district. The area includes Park Street and adjacent land owned by the Frankenmuth School District and leased to the City The project constructs drainage improvements, curb and gutter paving, LED lighting, a picnic pavilion, additional parking for general use, concerts and sporting events and site preparation for new playground and playground equipment. The park area and ampitheater offerings provide destinations for Frankenmuth's tourism industry. 7/1/2009

5/1/2010

$

975,000

Flint Street Improvements

The project improves Flint Street infrastructure including upgraded drainage, curb and gutter, street construction, sidewalk. The street improvements enable the development of a non-profit housing development to provide aging in place services for seniors (including low to moderate income). Services include the development of single family homes, duplexes/condominiums, apartments, assisted living and nursing home style residences. The non-profit developer projects the creation of 80 new, permanent full-time jobs at the site. 7/1/2009

7/1/2010

$

1,100,000

Main Street Streetscaping Project

Complete streetscaping improvements along the west side section of Main Street from Covered Bridge Lane to the River. Streetscape improvements, including new landscape beds, support connectivity for community assets supporting tourism and tourism related jobs development.The project completes a $12 million streetscape project finished over the past 10 years.

5/1/2009

10/1/2009

$

150,000

The development of an 80-space parking lot built with green grass block pavers with a bio-swale drainage system. The parking lot serves the Rose Garden, a City park and host to multiple weddings and family reunions. The parking lot will also provide overflow parking for the amphitheater in Memorial Park. The Rose Garden is a destination supporting Frankenmuth's significant tourism industry. The project helps to preserve tourism jobs and promote economic recovery. 5/1/2009

10/1/2009

$

160,000

E. Genesee Storm Drain Replacement near Block Rd

The Storm Drain provides service for a one square mile area including existing and potential residential development. The undersized and deteriorated 36" diameter pipe needs replacement with 54" concrete pipe. A large junction chamber also needs to be built where the new pipe connects to an existing culvert. Replacing the drain assures storm drainage reliability for the area and reduces potential flooding. The Storm Drain serves an area in both City of Frankenmuth and Frankenmuth Township. 5/1/2009

7/31/2009

$

251,000

Main Street (M83) and Weiss Street Light Upgrade to LED

Change light fixtures from high pressure sodium or metal halide to LED to reduce electical usage. The project includes approximately 400 light poles. The upgrade will reduce electricity consumption by 80%, reduce out of pocket expenses from $50,000 to $10,000 annually. 7/1/2009

City of Frankenmuth

7/1/2010

$

400,000

Ash Tree Replacement Project

A total of 845 diseased and insect ridden Ash trees are planted in the City of Frankenmuth public right of ways and parks. The project includes tree removal, stump grinding, appropriate disposal of waste and replanting of new species in its place. The existing Ash trees are dying; Replacement of trees in this urban setting helps to provide shade, cooling the general area and reducing the carbon footprint.

City of Frankenmuth

5/1/2010

$

400,000

d e t

Memorial Park Rose Garden Add'l Parking

S

City of Frankenmuth

City of Frankenmuth

02262009

P P A

N s

t s e

qu

e R

Submitted Requests - Not Approved

O R

5/1/2009

Route (Infrastructure Only)

D VE

1,650,000

T O

4/1/2011

Funding Request

$

m b u

City of Frankenmuth

Start Date

The current Storm Sewer System serving the northwest quandrant of the City is undersized, creating basement flooding in both residences and commercial properties. Street flooding is common. For use as a relief sewer during heavy rain events, the project installs a new 3600 feet long / 36" concrete pipe paralell to the existing pipe at the most severe bottleneck within the general area's street right of way. The project protects private property including the property of a major employer and property owner within the City. 4/1/2010

itt

City of Frankenmuth

Project Description

Expected Completion Date

98 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

City of Frankenmuth

Project Name

Project Description

Start Date

Expected Completion Date

Beyerlein, Heine, Reif, Hubinger, Franklin, Plant and E. Tuscola Mill and Resurface

The project includes curb repair, milling of 3" of asphalt and replacement of same. The total length of the reconstruction project is about 1.5 miles. The mill and resurface project for these streets has been on the City's 50 year improvement plan since 1999. The last major repair to these streets was more than 30 years ago; the streets are in poor condition. Improvement to these streets retains property home values.

West Tuscola Reconstruct & Resurface Project

Reconstruct, mill and resurface W. Tuscola Street in the City of Frankenmuth, one of the City's major arteries. This project has been on the City's Capital Improvements Plan for more than 10 years; the last major repair of the street was more than 30 years ago. The project assures mobility through the business district and retains property values. 5/1/2009

Pedestrian Bridge to Heritage Park

Construction of a pedestrian bridge from Main Street (M83) to Heritage Park will provide imrproved access for walking, improved connectivity from Downtown to a major City park and improved access to parking. The Pedestrian Bridge maximizes the use of existing parking areas, reducing the need to build more parking, ultimately protecting existing greenspace and decreasing the carbon footprint. 7/1/2010

E. Genesee Storm Drain Replacement near Block Rd

The Storm Drain provides service for a one square mile area including exisitng and potential residential development. The undersized and deteriorated 36" diameter pipe needs replacement with 54" concrete pipe. A large junction chamber also needs to be built where the new pipe connects to an existing culvert. Replacing the drain assures storm drainage reliability for the area and reduces potential flooding. The Storm Drain serves an area in both City of Frankenmuth and Frankenmuth Township.

T O

5/1/2009

10/30/2009

N s

D VE $

490,000

$

600,000

7/1/2011

$

1,200,000

7/31/2009

$

251,000

7/31/2009

$ $ $ $ $ $

600,000 y 300,000 400,000 400,000 410,000 660,000

O R

P P A

Funding Request

10/30/2009

Route (Infrastructure Only)

t s e

City of Frankenmuth City of Fraser City of Fraser City of Fraser City of Fraser City of Fraser

City of Frankenmuth City of Fraser City of Fraser City of Fraser City of Fraser City of Fraser

City of Fraser City of Fraser City of Fraser City of Fraser City of Fraser

City of Fraser City of Fraser City of Fraser City of Fraser City of Fraser

u q e

R d

North Main M83 Ditch Enclosure supporting Frankenmuth Business Park Rainbow Water Main 14 Mile Water Main Calahan Drain Breezeway Water Main Mulvey Road Resurfacing

e t tt

i m

b u S

Asphalt Road Rehab Utica Road Water Main Water System Reservoir Concrete Road Rehab Hayes Masonic Interceptor

City of Fraser

Fraser

Rainbow Water Main

City of Fraser

Fraser

Callahan Drain Improvements

02262009

North of the City limits, M83 (Main St/Gera Road) narrows from five lanes to two lanes inclusive of an open ditch on the East side of the highway. The City, with agreement from Frankenmuth Township, has initiated development of the Frankenmuth Business Park in the immedeate area. The City has already invested in utilities to the site. To provide for appropriate road improvements to widen the street to service the Business Park and to add curb, gutter and sidewalks to the area, the ditch along the east side of the road must be filled with appropriate material and a drain tile installed, connecting to existing service. The investment is necessary to provide for proper storm water drainage preventing flooding. This project is on the City's Five Year Capital Improvement Plan. It is hoped that the Business Park will generate between 50 and 200 long-term, sustainable jobs. 5/1/2009 Rainbow Water Main - Eveningside to Slumber Ln 5/1/2009 14 Mile Water Main Replacement - Edgegrove to Garfield 5/1/2009 Calahan Drain Improvements 5/1/2009 Breezeway Water Main Replacement -Eveningside to Kelly 5/1/2009 Mulvey Road Resurfacing - 14 Mile to Utica Road 5/1/2009 Asphalt Road Rehabilitation - College Blvd, Caroline, Callahan, Leota, Park Ln, Depot other various locations 5/1/2009 Utica Road Water Main - 14 Mile to Groesbeck 5/1/2009 Water System Reservoir 5/1/2009 Concrete Road Rehabilitation - various locations 5/1/2009 Hayes Masonic Interceptor-Beacon Lane to 15 Mile 4/1/2009 Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year. Regrade and improve drain to address several drainage issues and to protect drain slopes and prevent soil erosion.

Submitted Requests - Not Approved

$ $ $ $ $

750,000 1,000,000 2,500,000 5,000,000 12,000,000

5/1/2009

9/1/2009

$

Eveningside to 300,000 Slumber

5/1/2009

9/1/2009

$

400,000 13 mile to 14 Mile

99 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Fraser

City of Fraser

Fraser

Fraser

Project Name

Project Description

Start Date

Expected Completion Date

Breezeway Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

8/1/2009

14 Mile Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

8/1/2009

6/1/2009

O R

Funding Request

$

Eveningside to 410,000 Kelly

$

Edgegrove to 800,000 Fraser

D VE

City of Fraser

Fraser

Utica Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

City of Fraser

Fraser

Water System Reservoir

Construct a water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows.5/1/2009

Fraser

Hayes Masonic Sanitary Sewer Overflow

Construct a sanitary sewer interceptor designed to carry wet weather flow for a large portion of the City. This project will eliminate a sanitary sewer overflow and satisfy a current Administrative Consent Order from MDEQ 5/1/2009

6/1/2010

$

City of Fremont

Fremont School Resource Officer Program (Police)

Fremont Public Schools and the City of Fremont have identified a need for a School Resource Officer. Funds will be used to implement Fremont's first School Resource Officer for a three (3) year program serving nine (9) schools. 9/1/2009

9/1/2012

$

225,000

Fremont Brownfield Development Project on Elm Street (Brownfield/Economic Development)

The Newaygo County Brownfield Authority has identified a property on Elm Street in Fremont as a potential brownfield site. The funds will be used to test, evaluate, revitalize and market this potential brownfield site. The City wants to relocate the existing recycling business to the Fremont Industrial Park. Testing of the soils is necessary and clean up of the site is likely. The subject property is located near the downtown, and there is a possibility for the redevelopment of the site into multi-family housing, a city park, etc. 8/1/2009

8/1/2010

$

200,000

City of Fremont

Downtown Fremont Parking Lot Reconstruction Project (Economic Development)

In accordance with the Fremont Downtown Revitalization Enhancement Plan, the City of Fremont will make improvements to three downtown public parking lots. Improvements include reconstruction of retaining walls, parking lot resurfacing, new decorative street lights, landscaping, etc. Improving these lots will assist businesses in meeting the needs of its patrons, which will aid in retaining businesses. 7/1/2009

9/1/2010

$

2,720,750

City of Fremont

Fremont - New Well #11 and Wellhouse Project (Infrastructure)

The City of Fremont's recent water system assessment identified the need for an additional well to provide long-term sustainability and growth of the municipal water supply system. Funds will cover the costs of a new well and wellhouse.

7/1/2009

9/1/2010

$

400,000

Fremont - Sewage Lift Station Project (Infrastructure)

Fremont's Joint Comprehensive Development and Growth Management Plan outlines the need for a new lift station to handle planned mixed-use developments. The City encourages mixed-use developments as part of a Smart Growth strategy. Funds will cover the installation of a lift station that will be located at 56th and Warner. 7/1/2009

9/1/2010

$

143,750

Fremont Police Outdoor Shooting/Practice Range Enhancements (Police)

The funds will be used to enhance the Police Outdoor Shooting/Practice Range, which serves all county, state and federal law enforcement agencies. Specifically, the funds will be used to remove and recycle over 25 years of lead ammunition from the shooting range berms and to make improvements for safety enhancements. 4/1/2009

10/1/2009

$

75,000

City of Fraser

City of Fremont

City of Fremont

City of Fremont

City of Fremont

City of Fremont

City of Fremont

City of Fremont

S

m b u

City of Fremont

City of Fremont

02262009

s

t s e

O N

u q e

R d

e t t

it

A T

PP

Submitted Requests - Not Approved

Route (Infrastructure Only)

11/1/2009

$

14 Mile to 1,000,000 Groesbeck

12/1/2009

$

14 Mile and 2,500,000 Garfield Masonic- Beacon Lane to Hayes and Hayes- Masonic to 12,000,000 15 Mile Road

100 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Fremont

City of Fremont

Project Name

Project Description

Start Date

Expected Completion Date

City of Fremont

In order to spur on regional tourism, Fremont is creating a public art public walking tour as part of an economic development strategy. In keeping with the City's Art Fremont Public Art Walking Tour Art Projects Placement Plan, funding will be used to create public art for the tour on the Fremont (Economic Development) Cooperative's Main building (mural) and in Veterans' Memorial Park (sculpture).

City of Fremont

Fremont - Town & Country Path Phase 2b Construction (Environment, Recreation and Green)

Fremont's Joint Parks & Recreation Plan identifies the need for many phases for the development of the Town & Country Path. The funds will be used to construct Phase 2b of the Town & Country Path from Main Street to Pathfinder School. The Path is one way Fremont supports creating healthy communities. 4/1/2009

3/1/2009

10/1/2009

D VE $

75,000

$

175,000

10/1/2010 11/15/2009 11/15/2009

$ $ $

115,000 397,800 601,860

O R

P P A

Funding Request

6/1/2010

City of Fremont City of Galesburg City of Galesburg

City of Fremont Galesburg, City of Galesburg, City of

Fremont Streetscape/Signage Project (Economic Development) 35th St. to 36th St. Water Main 36th St. to 37th St. Water Main

In accordance with the Downtown Fremont Marketing Plan, the City wants to create the "WOW" factor to encourage visitors to come to Fremont to enjoy all it has to offer. In order to create the "WOW" factor, streetscape and signage improvements are proposed. Improvements to be funded include community event signs, a City Hall information sign, landscaping, flowers, etc. 4/1/2009 Close water main loop from 35th Street to 36th Street 6/15/2009 Close water main loop from 36th Street to 37th Street 6/15/2009

City of Galesburg

Galesburg, City of

Blake Water Main

Replace 6-inch water main in Blake (Grant to Grove) with 8-inch water main

5/15/2009

11/15/2009

$

70,200

City of Galesburg

Galesburg, City of

Grove Water Main

11/15/2009

$

70,200

City of Galesburg

Galesburg, City of

Mills St. Water Main

11/15/2009

$

70,200

City of Galesburg

Galesburg, City of

Norms Place Water Main

11/15/2009

$

72,000

City of Galesburg City of Galesburg City of Galesburg

Galesburg, City of Galesburg, City of Galesburg, City of

New St. Water Main Morhouse Dr. Water Main Battle Creek Mill/Resurface

11/15/2009 11/15/2009 11/15/2009

$ $ $

86,400 116,340 144,000

City of Galesburg

Galesburg, City of

M-96 (Burgess/36th St) Water Main

Replace 6-inch water main in Grove (Battle Creek to M-96) with 8-inch water main 5/15/2009 Replace 4-inch and 6-inch water main in Mills Street (South of Battle Creek Street) with 8-inch water main 5/15/2009 Replace 6-inch water main in Norms Place (M-96 to Beckwith) with 12-inch water main 5/15/2009 Replace 4-inch water main in New Street (Battle Creek to Gale Valley Estates) with 8inch water main 5/15/2009 Close water main loop at Morhouse Drive 5/15/2009 Mill and resurface Battle Creek Street 5/15/2009 Replace 8-inch water main in M-96 (Burgess/36th Street, east of 12” water main) with 12-inch water main 5/15/2009

11/15/2009

$

216,000

City of Galesburg

Galesburg, City of

M-96 (Grant to Norms Place) Water Main

11/15/2009

$

230,400

City of Galesburg

Galesburg, City of

Battle Creek Water Main

Replace 6-inch water main in M-96 (Grant to Norms Place) with 12-inch water main 5/15/2009 Replace 6-inch water main in Battle Creek from Shafter/35th Street to Burgess / 36th Street with 12-inch water main 5/15/2009

11/15/2009

$

720,000

City of Garden City

Garden City

City Hall Roof Replacement

Replace the existing roof at City Hall that requires constant maintenance and repairs. 7/1/2009

10/31/2009

$

250,000

City of Garden City

Garden City

Sewer Lining

7/1/2009

10/31/2009

$

2,500,000

City of Garden City City of Garden City

Garden City Garden City

Sewer lining of 2.5 miles of critical sanitary sewer to prevent sewer failures Removal of two underground storage tanks at PD and the construction of an above ground fuel tank at the DPS yard Complete renovation of the Maplewood Community Cente

7/1/2009 7/1/2009

10/31/2009 10/31/2010

$ $

500,000 7,000,000

City of Garden City

Garden City

7/1/2009

10/31/2010

$

10,000,000

City of Garden City

Garden City

7/1/2009

6/30/2010

$

4,000,000

City of Garden City City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord

Garden City City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord

7/1/2009

10/31/2009

$ $ $ $ $ $ $

2,000,000 237,781 337,062 350,000 663,200 700,000 1,700,000

02262009

S

m b u

s t s

-N

e u

eq

R d

e t t

it

T O

Underground Storage Tanks (UST) Maplewood Center Renovation Department of Public Service (DPS) Building Renovation Complete renovation of the DPS Building. Paving of 3 miles of local residential street rated as in poor condition. These street do Residential Street Paving not qualify for Federal funding through the TIP. Replacement of 2.5 mile of aging watermains. Replacing areas of the system with Watermain Replacement excessive watermain breaks. East mankowski Road Extension East and West Main Street Water and Samitary Main Addition Gateway Entrance to Downtown Gaylord - DDA WWTP Equipment Replacement - Priority and Secondary Downtown Gaylord Elevated Crosswalk - DDA Downtown Special Events Area - DDA

Submitted Requests - Not Approved

Route (Infrastructure Only)

101 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Gaylord City of Grand Blanc City of Grand Blanc

Perry Road Pathway

City of Grand Blanc

City of Grand Blanc

Center Road

City of Grand Blanc

City of Grand Blanc

Genesee Road

City of Grand Blanc City of Grand Blanc

City of Grand Blanc City of Grand Blanc

Reid Road Jewett Trail

City of Grand Blanc City of Grand Blanc City of Grand Blanc City of Grand Blanc City of Grand Haven City of Grand Haven

City of Grand Blanc City of Grand Blanc City of Grand Blanc City of Grand Blanc City of Grand Haven City of Grand Haven

Grand Blanc Road Davis Street Perry Road Saginaw Street New Water Plant Boardwalk

Project Description Street Improvements - North Otsego, North Court, and Mitchell Streets West M-32 Streetscape & Pathway Business Loop I-75 Streetscape Improvements WWTP - Plant Expansion Creation of Pathway on South Side of Perry Road Resurfacing, Curb and Gutter of Center Road from McFarland to 400 ft. north of Brainard Resurfacing, Curb and Gutter of Genesee Road from Hills of Kings Pointe Green to end Creation of Streetscape and On street Parking and resurfacing of Reid Road from Saginaw to West Street Creation of Pathway along Jewett Trail and north up Davis Stree Creation of Streetscape and Bike Pathway and Resurfacing of Grand Blanc Road within City Limits Resurfacing of Davis Street from Reid Road to Jewett Trail Resurfacing of Perry Road from Terrace to City Limits Resurfacing of Saginaw Street from Grand Blanc Road to City Limits Renovate Water Plant Reconstruct Boardwalk at City Connector Park

City of Grand Haven

City of Grand Haven

Beechtree Infrastructure

Total reconstruction of Beechtree Street from Waverly to Fulton in the City of Grand Haven including sanitary sewer, storm drains, water lines and electrical utilities.

City of Grand Haven

City of Grand Haven

Harbor Drive

Total reconstruction of Harbor Drive from Waverly to Fulton in the City of Grand Haven including sanitary sewer, storm drains, water lines and electrical utilities.

City of Grand Haven

City of Grand Haven

Washington Avenue

City of Grand Haven City of Grand Haven City of Grand Haven City of Grand Haven City of Grand Haven

City of Grand Haven City of Grand Haven City of Grand Haven City of Grand Haven City of Grand Haven

WWTP Phosphorus Removal North End Infrastructure Odor Contrtol WWTP Adams Street RR Crossing UV Disinfection

City of Grandville

Grandville

Admin Building Air Handler Replacement

City of Grant City of Grant

City City

City of Grant Blanche Lake Park City of Grant Storm Water Improvement

City of Grant

City

City of Grant City of Grant City of Grant City of Grant

City City City City

City of Grant

City

02262009

Streetscape

S

Start Date

9/15/2009

6/5/2010

9/15/2009

6/5/2010

9/15/2009

6/5/2010

9/15/2009 6/15/2009

City of Grant Industrial Park

Funding Request 1,752,684 1,873,942 7,250,000 7,300,000 500,000 Major Street

$

500,000 Major Street

$

500,000 Major Street

$ $

750,000 Major Street 250,000 Major Street

D VE $ $ $ $ $ $

9/1/2009

9/1/2010

$

3,000,000 Beechtree

9/1/2009

9/1/2010

$

3,000,000 Harbor

Total reconstruction of Washington Avenue from Waverly to Fulton in the City of Grand Haven including sanitary sewer, storm drains, water lines and electrical utilities.9/1/2009

9/1/2010

$

5,000,000 Washington

9/1/2009 5/1/2010 9/1/2011 9/1/2010 9/1/2010

$ $ $ $ $

350,000 4,500,000 1,000,000 1,000,000 Adams/3rd 1,100,000

6/1/2009

$

summer 2009 summer 2009

$ $

300,000 500,000 M-37

$

700,000 M-37

summer 2009

$

700,000 M-37

summer 2009 summer 2009 summer 2009

$ $ $ $

2,862,000 50,000 250,000 250,000

summer 2009

$

1,000,000

t s e

O N

u q e

New biological system to remove phosphorus from wastewater in Grand Haven 5/1/2009 Boardwalk, sanitary sewer, water, streets, lighting, parking 5/1/2009 Implement odor control technology at WWTP 9/1/2010 Construct approved RR Crossing to facilitate Grand Landing Developmen 9/1/2009 Eliminate chlorine feed & go to UV light disinfection at WWTP 5/1/2010 Retrofit existing Multi Zone air handler and upgrade system to VAV System. Expected energy savings to be 25 - 35%. Spring 2009 Provide baseball diamond, shelter, new fishing dock, recreational equipment and paving summer 2009 Provide more adequate storm sewers to handle runoff summer 2009

R d

Streetscape Wastewater treatment plant and collection system upgrade Solar Roof for City Office Pave-Resurface Roadways 6.03 miles Pave-Resurface Roadways 6.03 miles

6/5/2010 9/1/2009

$ $ $ $ $

9/1/2009 10/15/2009 10/15/2009 10/15/2009 5/1/2012 5/1/2011

s

e t t

O R

PP

6/15/2009 8/15/2009 8/15/2009 8/15/2009 5/1/2010 5/1/2010

A T

it

m b u

City

City of Grant

Project Name

Route (Infrastructure Only)

Expected Completion Date

Revitalize M-37 corridor through the center of the City, to improve traffic, pedestrian friendly sidewalks, new LED environmentally friendly street lights, in effort for economic benefit Revitalize M-37 corridor through the center of the City, to improve traffic, pedestrian friendly sidewalks, new LED environmentally friendly street lights, in effort for economic benefit spring 2009 Upgrade treatment plant and collection system that was installed in 1954 that is in dire need of repair and upgrades spring 2009 Solar roof for City Office will reduce energy cost to the City by ~40% summer 2009 resurface streets in need of repair resurface streets in need of repair with 2 inch high density paver summer 2009 Provide water, sewer and road access in order to create three industrial sites for job and tax base growth summer 2009

Submitted Requests - Not Approved

800,000 200,000 500,000 750,000 20,000,000 1,000,000

Major Street Major Street Major Street Major Street

70,000

102 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grant

City

Project Name

Project Description

Expected Completion Date

Start Date

Provide water, sewer and road access in order to create three industrial sites for job and tax base growth on 40+ acres of land the City already owns on the northeast side This would help foster economic grow in tax base and future jobs.

City of Grant Industrial Park

Funding Request

Route (Infrastructure Only)

$

1,000,000

$

2,500,000 M-37

$

700,000 M-37

D VE

City of Grant

City

Burry overhead utilities downtown

City of Grant

City of Grant

Streetscape

Burry overhead utility lines that run through the downtown corridor along M-37. This would enhance the streetscape project, which promotes economic development and would eliminate driving hazards along M-37 in town. Fix and add sidewalks along M-37 through town, add trees, new LED streetlights (save energy), improve curbing, etc…beautification

City of Grant

City of Grant

Wastewater treatment plant and collection system upgrade

Upgrade treatment capacity and process at the plant, repair original collection system spring/summer originally installed in 1954. Much needed upgrades and improvements 2009

summer 2009

$

Newcastle Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

8/1/2009

$

Mack to West City 335,000 Limit

Ridgemont Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

8/1/2009

$

Mack to West City 350,000 Limit

Hampton Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

9/1/2009

$

Wedgewood to 350,000 East City Limit

Lancaster Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

9/1/2009

$

Mack to West City 350,000 Limit

Bournemouth Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

9/1/2009

$

360,000 Mack to Leslie

5/1/2009

8/1/2009

$

365,000 Goethe to Marter

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year. 5/1/2009 Provide water main loops where dead ends currently exist. The project will increase system reliability and available fire flows. 5/1/2009

9/1/2009

$

Wedgewood to 500,000 East City Limit

9/1/2009

$

500,000 Various Locations

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Hollywood Water Main

t i m

Lochmoor Water Main

Grosse Pointe Woods

Water Main Loops

ub

S

Grosse Pointe Woods

Grosse Pointe Woods

02262009

s t s

P P A

-N

e u

eq

R d

e t t

Grosse Pointe Woods

Grosse Pointe Woods

T O

O R

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

2,862,000

Severn Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

11/1/2009

$

Mack to West City 500,000 Limit

Sunningdale Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

9/1/2009

$

Fairway to East 520,000 City Limit

Anita Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

10/1/2009

$

560,000 Mack to Marter

Submitted Requests - Not Approved

103 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grosse Pointe Woods

City of Grosse Pointe Woods

City of Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Grosse Pointe Woods

Project Name

Project Description

Start Date

Expected Completion Date

Allard Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

10/1/2009

Brys Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

10/1/2009

Fairholme Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

$

Mack to West City 620,000 Limit

$

640,000 Mack to Marter

10/1/2009

$

820,000 Mack to Fairford

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE

City of Grosse Pointe Woods

Grosse Pointe Woods

South Renaud Water Main

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2009

11/1/2009

$

Mack to North 900,000 Renaud

City of Grosse Pointe Woods

Grosse Pointe Woods

Water System Reservoir

Construct a water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows.5/1/2009

10/1/2009

$

2,000,000 North end of City

Line or Replace Sewers

Line or replace structurally deficient sewers throughout the City in order to alleviate sewer failures which may cause sewer backups, sanitary sewer overflows and costly, disruptive restoration. 5/1/2009

6/1/2010

$

8,000,000 Various Locations

$

1,200,000

City of Grosse Pointe Woods

Grosse Pointe Woods

Conant Avenue

Park Playscape Equipment

Veteran's Park used to have playscape equipment that was burned by vandals. The City has not had the funds to replace the equipment. The new equipment would draw more people into the park, and the equipment would be handicap accessible. 7/1/2009

October 31,2009

$

200,000

Replacement of an outdoor ice rink

The outdoor ice rink was widely used every year. Due to age, the chiller units need to be replaced as they can no longer be repaired. As part of the project we want to add a warming house and washrooms. 5/1/2009

October 31,2009

$

2,000,000

Hamtramck

Hamtramck Trail

City of Hamtramck

Hamtramck

Caniff Street

City of Hamtramck

Hamtramck

Holbrook Street

City of Hamtramck

Hamtramck

Gallagher Street

City of Hamtramck

Hamtramck

Lumpkin Avenue

City of Hamtramck

Hamtramck

Caniff Street

City of Hamtramck

Hamtramck

Conant Avenue

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

Hamtramck

02262009

m b u

Holbrook Street

s t s

e u

eq

R d

e t t

it

S

-N

Construction of a hike/bike trail system connecting several neighborhoods, schools, parks, and amenities throughout the City of Hamtramck. It will serve as both a recreation asset, and create an option for alternative transportation. The planned network will also connect with the City of Detroit Non-motorized plan, the Dequinder Cut, and will ultimately integrate the City into a region wide net work of over 450 miles of trailways. 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1/2 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1/2 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1 1/4 mile of roadway 4/1/2009 Upgrade 80 year old water main and service connections, replacement of storm sewers to reduce flooding and repair 4 lane, 1 mile of roadway 4/1/2009

City of Hamtramck

City of Hamtramck

T O

Submitted Requests - Not Approved

8/31/2009

$

8/31/2009

$

9/30/2009

$

9/30/2009

$

9/30/2009

$

9/30/2009

$

9/30/2009

$

9/30/2009

$

Jos. Campau to 2,500,000 Conant Jos. Campau to 2,500,000 Conant Carpenter to 2,700,000 Denton Carpenter to 3,300,000 Denton Jos. Campau to 4,500,000 Nagel Holbrook to 4,500,000 Hamtramck Drive Jos. Campau to St. 5,250,000 Aubin Carpenter to 5,500,000 Holbrook

104 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Hamtramck

City of Hamtramck

City of Hamtramck

Project Name

Project Description

Start Date

Hamtranck City Promenade

Construction of a linear park/median system along Joseph Campau running from Caniff north to Carpenter. This new linear park will add valuable green space, which is at a premium in the City of Hamtramck’s dense, urban environment. The Promenade is envisioned to include a landscaped median, public art, pocket parks, and design elements that will allow for coordinated closure of all traffic lanes for large scale public events and festivals, effectively tripling the size of the park space. 4/1/2009

Hamtramck

New Fire Station

Currently the Fire Department is housed in a 75+ year old facility, Numerous repairs have been done simply to keep the facility operational. Upgrades have not addressed the need for upgrading equipment, enhanced facilities for equipment maintenance or training for the fire fighters. Upgrading is no longer a viable option, only replacement will work. 8/1/2009

Hamtramck

The current City Hall is housed in an old, historic hospital building. While many upgrades have occurred, much more work is required in order to complete the Rehabilitation of the Current City Hall Building renovation and to make overall operations more efficient.

Hamtramck

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

City of Hamtramck

Hamtramck

T O

-N

e u

Funding Request

$

3,500,000

7/31/2010

$

6,000,000

3/31/2010

$

8,000,000

3/31/2010

$

10,000,000

9/30/2009

$

6,000

October 31,2009

$

8,000

October 31,2009

$

8,000

October 31,2009

$

8,000

11/30/2009

$

11,020

11/30/2009

$

16,000

11/30/2009

$

18,500

O R

Links the City Assessor with the County Assessor's Office allowing for "real time" transfer of information. Would eventually allow for a link through the City's website for use by citizens. 7/1/2009 Development of a new website to allow for more effective communications with our citizens and business people. 7/1/2009 Acquisition and installation of Laserfiche software and hardware to enhance the City's ability to track and retrieve documents 7/1/2009 Installation of security cameras in the downtown district to enhance security. Cameras would be monitored by the Police Department 7/1/2009

10/31/2009

$

30,600

10/31/2009

$

50,000

eq

City of Hamtramck

Hamtramck

County Equalizer Data Link

City of Hamtramck

Hamtramck

Website Enhancement

City of Hamtramck

Hamtramck

Document Imaging/ Management Software

City of Hamtramck

Hamtramck

Wireless CCTV Cameras

City of Hamtramck

Hamtramck

PC Upgrade/Replacement Project

Purchase and installation of new personal computers and software in order to standardize applications throughout the City and enhance communcations.

7/1/2009

10/31/2009

$

58,500

In-Car Mobile Data Consoles

Installation of Mobile Date Computers in our Police cars. This will allow for faster running of information, running of LEIN inquiries, and filing of reports without having officers leave their vehicles

7/1/2009

11/30/2009

$

100,000

Income Tax Software

Replaces current 13 year old software which has become obsolete and is not longer supported by the distributor. Project enhances collection and reporting efforts, and improve overall cash flow. 7/1/2009

8/31/2009

$

101,307

Radio Upgrade Project

This will bring the City to the current State recommended communications platform allowing Hamtramck to communicate with Federal, State and Local agencies during an emergency

7/1/2009

8/31/2009

$

160,000

Insitu repair of municipal sewer lines

In situ lining of the municipal system with a rubberized material that will ensure the stability of the system.

Immediately when 60 days after contract is funds become awarded available

$

2,000,000

City of Hamtramck

City of Hamtramck

City of Hamtramck

City of Harbor Beach

Hamtramck

m b u

S

Hamtramck

Harbor Beach

02262009

e t t

it

Hamtramck

R d

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

October 31,2009

P P A 4/1/2009

Currently the Hamtramck City Hall is housed in an old, historic hospital building. We have on old store which has the size and location that would be perfect for a new City Rehabilitation of Building for New City Hall Hall. If approved the current city Hall would be remodeled and converted for housing. 4/1/2009 Allows for these capabilities within the Public Works Department. Improves Engineering Plotter / Non Imaging Scanner turnaround and reduces overall cost of operations 7/1/2009 Allows for improved security for City facilities and for our residents by assuring the ID Card Equipment City employees are clearly identified 7/1/2009 Enhance the Police Department's capability to perform undercover and SCAT Covert Surveillance Equipment operations. 7/1/2009 Replaces current system which fails frequently and adds to problems in broadcasting Audio / Visual Upgrade for Council Chambers City Council meetings for our residents 7/1/2009 Installs wireless broadband in two public parks to allow for public access. Will Wireless Broadband for Public Spaces improve the overall utilization of the parks. 7/1/2009

s t s

Expected Completion Date

105 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Harbor Beach

Harbor Beach

City of Harbor Beach

Harbor Beach

City of Hart

City of Hart

City of Hart City of Hazel Park City of Hazel Park

City of Hazel Park City of Hazel Park City of Hazel Park

City of Hazel Park City of Hazel Park City of Hazel Park City of Hazel Park City of Hazel Park City of Hazel Park City of Hazel Park

Project Description

Start Date

Extension of water and sewer line to threshold Connecting onto existing city water and sewer lines and running those lines to the of Brownfield site threshold of the Brownfield site. Upgrade existing base and resurface 2 miles of roads Redevelop 2 miles of existing base and resurface with asphalt.

City of Hart

City of Hart

Project Name

Hart Public Schoos, City of Hart City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030

Wood Street & Dryden Street Water/Sewer Improvements

This project would include replacement of a sanitary sewer, water main, Stormwater separation, and street replacement located at Wood Street and Dryden Street

Peach Street Improvements

This project would include street, sewer, water and sidewalk replacement/improvements on Peach Street;which is the primary route for traffic to the Hart Public School campus.

Johnson Street Extension North and South Chrysler Service Drive Resurfacing

This project would consist of an extension of Johnson Street to 72nd Avenue to enhance safety to students and pedestrians, and security of the Hart Public School campus. Resurface both the North and South Chrysler I-75 service drives from 10 Mile Road to 8 Mile Road

City-wide surface street restriping

Restripe all surface streets and roads in the City

Immediately when 60 days after funds become contract is available awarded

O R

4/9/2009

PP

6/9/2009

A T

8/9/2009

Funding Request

500,000

$

400,000

$

Intersection of Wood/Dryden, south on Dryden to 277,000 Wigton Street

$

Peach Street, between W. Main Street and Johnson 550,000 Street

$

Johnson Street between Peach Street and 72nd 389,000 Avenue

D VE

9/9/2009

9/9/2009

O N

2,000,000

$

25,000

$

35,000

$

35,000

$

78,344

$

85,000

Resurface DPW parking lot Resurface a 900' x 30' stretch of W. Elza (a residential street) from John R Road to Ford Road.

$

100,000

$

150,000

$

165,000

$

170,000

$

170,000

West End Resurface

Install 75 new handicap ramps in sidewalks Resurface a 900' x 30' stretch of W. Elza (a residential street) from Ford Road to West End Road. Resurface a 900' x 30' stretch of W. George (a residential street) from John R Road to Ford Road. Resurface a one mile stretch the eastern half of West End (a residential street) from 8 Mile Road to 9 Mile Road.

$

200,000

Couzens Resurface

Resurface and install new curbs for Couzens Street. This project is for the entire 1/2 mile portion of Couzens Street that is located within the jurisdiction of Hazel Park.

$

250,000

$

100

s

Morehouse Resurface

Resurface a 200' x 30' section of Annabelle (a residential street). The project would also include new sewers, catch basin, curbs, and sidewalks. Resurface a 200' x 30' section of Morehouse(a residential street). The project would also include new sewers, curbs, sidewalks, and an apron.

9 Mile Road Maintainence

Crack seal a 1 1/4 mile section of 9 Mile Road from Dequindre Road to West End

Annabelle Resurface Phase I

Resurface a 500' x 30' section of Annabelle (a residential street). The project would also include a new catch basin, sewer work, new curbs and sidewalks.

Annabelle Resurface Phase II

e u

e t t

ADA upgrades

it

eq

R d

DPW Parking Lot W. Elza Resurface Phase I

st

W. Elza Resurface Phase II W. George Resurface

City-wide Sidewalk Program

Sidewalk program for new sidewalks throughout city

City of Hazel Park

City of Hazel Park, MI 48030 City of Hazel Park, MI 48030 City of Hazel Park, MI 48030

City Hall Façade

New façade for City Hall

early spring '09

mid summer '09

$

17,000

City of Highland Park

Highland Park

McGregor Building

Library Building Rehabilitation

1/1/2010

12/31/2010

$

6,000,000

City of Highland Park

Highland Park

Water Treatment Plant Rehabilitation

Rehabilitation throughout the entire Water Treatment Plant

1/1/2010

12/31/2010

$

25,000,000

City of Hazel Park City of Hazel Park

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

$

$

m b u

S

Expected Completion Date

106 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

City of Highland Park

Highland Park

Water Meter Remote Reads

Provide remote read capability for 4,000 residential accounts

1/1/2010

12/31/2010

$

1,000,000

City of Highland Park

Highland Park

City-Wide Water Main Lining

Cured-in-Place Lining throughout City

6/1/2009

8/31/2010

$

72,990,720

City of Highland Park

Highland Park

6/1/2009

8/31/2010

$

72,990,720

City of Highland Park

Highland Park

City-Wide Sanitary Sewer Lining Cured-in-Place Lining throughout City NW Corner of City (West of Hamilton, north of Puritan) Replace 12,770 feet of 6-inch main with new 8-inch main

9/1/2009

12/31/2010

$

2,949,000

City of Highland Park

Highland Park

Oakland 8-inch WM

5/1/2009

$

19,000

City of Highland Park

Highland Park

$

89,000

Highland Park

9/30/2009

$

146,000

City of Highland Park

Highland Park

PP

9/30/2009

City of Highland Park

Cottage Grove WM Replacement Replace 390 feet of 6-inch main with new 8-inch main SE Corner of City (formerly Connecticut St.) WM Replacement Replace 630 feet of 6-inch main with new 8-inch main John Glenn, JF Kennedy and Shawcross WM Replacement Replace 690 feet of 6-inch main with new 8-inch main

6/1/2009

9/30/2009

$

159,000

City of Highland Park

Highland Park

Parking Meters

Install 400 parking meters on Woodward and City lots

6/1/2009

10/31/2009

$

160,000

City of Highland Park

Highland Park

Fire Hydrant Replacement

Replacement of existing hydrants throughout the City

6/1/2009

10/31/2009

$

168,000

City of Highland Park

Highland Park

Candler WM Replacement

Replace 1,320 feet of 6-inch main with new 8-inch main

7/1/2009

10/31/2009

$

305,000

City of Highland Park

Highland Park

Replace 1,830 feet of 6-inch main with new 8-inch main

7/1/2009

10/31/2009

$

423,000

City of Highland Park

Highland Park

7/1/2009

10/31/2009

$

474,000

City of Highland Park

Highland Park

Gerald WM Replacement Glendale, Second and Mulford WM Replacement Oakman, Kendall and Lincoln WM Replacement

Replace 2,910 feet of 6-inch main with new 8-inch main

7/1/2009

10/31/2009

$

675,000

City of Highland Park

Highland Park

City-Wide Alley Pavement Rehabilitation

3-inch Bituminous Overlay

6/1/2009

10/31/2009

$

6,656,000

City of Highland Park

Highland Park

Bituminous Street Rehabilitation

Hot-in-Place with 2-inch Bituminous Overlay

6/1/2009

10/31/2009

$

9,736,000

City of Highland Park

Highland Park

Sidewalk Safety Improvements

Sidewalk Gap Project and Sidewalk Repair

5/1/2009

10/31/2009

$

24,121,600

City of Highland Park

Highland Park

Concrete Road Rehabilitation

Joint, Crack and Panel Repair and Replacement

5/1/2009

10/31/2009

$

46,732,800

City of Highland Park

Highland Park

Fire Truck - Ladder Truck

$

1,200,000

City of Howell City of Howell

Howell City Howell City

Parking Lot#1 Construction Public Works Complex Improvements

City of Howell City of Howell City of Howell City of Howell City of Howell City of Howell

Howell City Howell City Howell City Howell City Howell City Howell City

City of Howell City of Howell City of Howell City of Howell

Howell City Howell City Howell City Howell City

City of Howell

Howell City

02262009

Place 80 feet of main to loop the 8-inch and the 16-inch

A T

O N

Replace 2,050 feet of 6-inch main with new 8-inch main

e u

eq

Sibley & Michigan 1,184,500 Ave. 7,500,000 Sibley & Michigan Ave.

RECONSTRUCT PARKING LOT # 1 DPW COMPLEX IMPROVEMENT

8/9/2009 8/9/2009

8/10/2009 8/10/2009

$ $

Parking Lot#1 Construction Public Works Complex Improvements Tennis Court Replacement Argyle Lake Pedestrian Path Tennis Court Improvements - Bennett

RECONSTRUCT PARKING LOT # 1 DPW COMPLEX IMPROVEMENT TENNIS COURT REPLACEMENT AT BALDWIN PARK PLAY STRUCTURE FOR ARGYLE ST PARK PEDESTRIAN WALKING PATH ALONG LAKE RECONSTRUCT TENNIS COURTS AT BENNETT REC CTR

8/9/2009 8/9/2009 6/9/2009 7/9/2009 6/9/2009 7/9/2009

8/10/2009 8/10/2009 10/9/2009 10/9/2009 9/9/2009 10/9/2009

$ $ $ $

23,000 49,000 51,500 Howell City Park 120,000

Bennett Center Parking Lot Improvements Running Track Upgrades Water Tower Improvements South Walnut reconstruction

REPLACE PARKING LOT AT BENNET RECREATION CTR RUNNING TRACK AT PAGE FIELD WATER TOWER PLANT IMPROVEMENTS Reconstruction of South Walnut Ave from Mason to Maple

6/9/2009 6/9/2009 6/9/2009 6/9/2009

9/9/2009 10/9/2009 10/9/2009 5/10/2009

$ $ $ $

North National Street

Reconstruction of North National Street from Grand River to Railroad

6/9/2009

5/10/2009

$

189,000 Grand River Ave. 200,000 300,000 576,812 South Walnut North National 663,843 Street

ub

S

st

6/1/2009

R d

e t t

t i m

s

6/1/2009

O R 7/30/2009

D VE

Route (Infrastructure Only)

Submitted Requests - Not Approved

107 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Howell Howell City

Project Name Water Treatment Plant Improvements

Project Description WATER TREATMENT PLANT IMPROVEMENTS

Start Date 6/9/2009

Expected Completion Date Funding Request 8/10/2009 $ 905,000

City of Howell

Howell City

East Clinton Reconstruction

Reconstruction of East Clinton from Michigan Avenue to National Street

6/9/2009

5/10/2009

City of Howell

Howell City

West Sibley Reconstruction

6/9/2009

5/10/2009

City of Howell

Howell City

Phase I Street Program

6/9/2009

8/10/2009

City of Howell

Howell City

Phase I Street Program

Reconstruction of West Sibley - Tompkins to Michigan Avenue PHASE I STREET IMPROVEMENT 4.575 MILES LOCAL STREET RECONSTRUCTION PHASE I STREET IMPROVEMENT 4.575 MILES LOCAL STREET RECONSTRUCTION

6/9/2009

8/10/2009

City of Howell

Howell City

East Clinton Reconstruction

Reconstruction of East Clinton from Michigan Avenue to National Street

6/9/2009

City of Howell City of Howell

Howell City Howell City

West Sibley Reconstruction South Walnut reconstruction

Reconstruction of West Sibley - Tompkins to Michigan Avenue Reconstruction of South Walnut Ave from Mason to Maple

City of Howell City of Howell

Howell City Howell City

North National Street Lake Pedestrian Path

Reconstruction of North National Street from Grand River to Railroad PEDESTRIAN WALKING PATH ALONG LAKE

City of Howell City of Howell City of Howell City of Howell City of Howell City of Howell City of Howell City of Howell

Howell City Howell City Howell City Howell City Howell City Howell City Howell City Howell City

Bennett Center Parking Lot Improvements Tennis Court Replacement Running Track Upgrades Argyle Tennis Court Improvements - Bennett Water Treatment Plant Improvements Water Tower Improvements Asset Management - Phase II

REPLACE PARKING LOT AT BENNET RECREATION CTR TENNIS COURT REPLACEMENT AT BALDWIN PARK RUNNING TRACK AT PAGE FIELD PLAY STRUCTURE FOR ARGYLE ST PARK RECONSTRUCT TENNIS COURTS AT BENNETT REC CTR WATER TREATMENT PLANT IMPROVEMENTS WATER TOWER PLANT IMPROVEMENTS RESURFACING BRIARHAVEN ST;MICROSEALING PHASE II & Rolling Oaks

City of Howell City of Howell

Howell City Howell City

Catrell/Sutton Resurfacing Browning Street Lift station

CATRELL ST REMILL/ RESURFACING BROWNING ST LIFT STATION REPLACEMENT

City of Howell

Howell City

Michigan Ave Rehab

City of Howell

Howell City

Michigan Ave Rehab

City of Howell City of Howell City of Howell

Howell City Howell City Howell City

Catrell/Sutton Resurfacing Browning Street Lift station Asset Management - Phase II Commuter Rail Project-WALLY North-South Commuter Rail

City of Howell City of Huntington Woods

Huntington Woods, City, located in S.E. Oakland County ,MI

tt i m

d e t

ub

P P A

O R

6/9/2009 6/9/2009

5/10/2009

D VE $

$

1,169,234 West Sibley Street Multiple Local 7,239,150 Streets Multiple Local Streets East Clinton Street West Sibley Street South Walnut North National Street Howell City Park

6/9/2009 6/9/2009

5/10/2009 9/9/2009

6/9/2009 6/9/2009 6/9/2009 7/9/2009 7/9/2009 6/9/2009 6/9/2009 6/9/2009

9/9/2009 10/9/2009 10/9/2009 10/9/2009 10/9/2009 8/10/2009 10/9/2009 10/9/2009

$

200,000

5/9/2009 6/9/2009

9/9/2009 10/9/2009

$ $

Catrell & Sutton 285,000 Streets 350,000

Milling and Resurfacing of Michigan Ave from Grand River Ave to M-59.

5/9/2009

6/9/2009

$

Michigan Avenue 430,000 Grand Rive to M-59

Milling and Resurfacing of Michigan Ave from Grand River Ave to M-59.

5/9/2009

6/9/2009

CATRELL ST REMILL/ RESURFACING BROWNING ST LIFT STATION REPLACEMENT RESURFACING BRIARHAVEN ST;MICROSEALING PHASE II & Rolling Oaks Construct five stations and institute operations for a north-south commuter rail from Howell to Ann Arbor on existing track.

5/9/2009 6/9/2009 6/9/2009

9/9/2009 10/9/2009 10/9/2009

4/1/2009

7/1/2009

T O

st

e u

q e R

N s

Replace light fixtures, windows, and HVAC Systems in the library and recreation center to reduce energy consumption by approximately 30%

City of Huntington Woods

Huntington Woods, City, located in S.E. Oakland County ,MI

Coolidge Highway Reconstruction

Complete reconstruction of the northbound lanes to replace extremely deteriorated asphalt on a high traffic road. Replacement to include water mains, gate valves, and sewer lines as needed. The proposed concrete surface will match the concrete already existing on the southbound lanes. 6/1/2009

12/1/2009

City of Huntington Woods

Huntington Woods, City, located in S.E. Oakland County ,MI

Energy Conservation Initiative

Replace light fixtures, windows, and HVAC Systems in the library and recreation center to reduce energy consumption by approximately 30%

4/1/2009

7/1/2009

City of Huntington Woods

Huntington Woods, City, located in S.E. Oakland County ,MI

Sewer Line Reconstruction

The re-lining and possible replacement (where required) of 50 to 75 year old main-line sanitary sewers 4/1/2009

9/1/2009

02262009

1,151,037 East Clinton Street

5/10/2009 5/10/2009

Energy Conservation Initiative

S

$

Route (Infrastructure Only)

Submitted Requests - Not Approved

Grand River Ave.

Michigan Avenue Grand Rive to M-59 Catrell & Sutton Streets

$

620,000 Coolidge Hwy 11 Mile Road to I-696 Service Drive 2,640 linear feet

Main-line collector sewers in the city

108 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Huntington Woods

Huntington Woods, City, located in S.E. Oakland County ,MI

City of Huntington Woods

Huntington Woods, City, located in S.E. Oakland County ,MI

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Inkster

City of Ionia

City of Ionia

City of Ionia

Project Name

Start Date

Sewer Line Reconstruction

The re-lining and possible replacement (where required) of 50 to 75 year old main-line sanitary sewers 4/1/2009

Coolidge Highway Reconstruction

Complete reconstruction of the northbound lanes to replace extremely deteriorated asphalt on a high traffic road. Replacement to include water mains, gate valves, and sewer lines as needed. The proposed concrete surface will match the concrete already existing on the southbound lanes. 6/1/2009

Eastern Outfalls CSO Control Project

The new collector pipes will collect the combined sanitary overflows from the uncontrolled eastern outfalls and will redirct the flows to the CSO Basin on Inkster Road

Harrison Road Reconstruction Project

From Henry Ruff to Michigan Ave. Reconstruction of road along with replacement of 12 inch water main and 36 inch storm pipe. The existing water main is more than 65 years old and the the breaks have contributed to the poor condition of the street. Will also improve the fire fighting requirements in terms of the water presure. 6/1/2009

City's major and Local streets which are in poor condition. Need water main replacement as well due to age and condition 1.9 Million gallon Retention and Treatment Basin for the western outfalls Farnum District sanitary releif sewer and pump station

T O

9/1/2009

12/1/2009

O R

10/1/2009

-N

To mitigate Basement flooding and capacity issues in th district.

4/1/2009

PROJECT #2 The project proposes improvements to the City of Ionia's historic City Hall. City Hall, constructed in 1908, is in need of heating and cooling system upgrades and light fixture replacement / upgrading. Most of these components are well beyond their useful lives and do not permit the City to heat, cool and light the building in an efficient, environmentally conscious manner.

e u

Main-line collector 875,000 sewers in the city

$

D VE $

Coolidge Hwy 11 Mile Road to I-696 Service Drive 2,850,000 2,640 linear feet

$

21,000,000

$

5,000,000

11/1/2009

$

12,000,000

11/1/2012

$

19,500,000

sept.2010

$

4,500,000

P P A

The poor condition of these streets is due to their age and has been contributed by very volume of water main breaks. The water mains under these streets are more thatn 65 to70 years old. The current surface condition of the streets is very unsafe for the users, like the residents, Police and Fire departments 5/1/2009 To capture and treat the uncontrolled combined sanitary overflows from the city's western outfalls 1/1/2009

s t s

Dec. 2012

Funding Request

Route (Infrastructure Only)

City of Ionia

City Hall Renovations

Within 30 days of Within 120 days of notification notification $

140,000 N/A

City of Ionia

PROJECT #1 The project proposes improvements to the City of Ionia's historic Ionia Armory which is utilized by the City as its community center. The Armory, constructed in 1908, is in need of new windows, tuck pointing and restroom upgrades. The new windows and tuck pointing will permit the City to achieve efficiencies in heating and cooling the building. The Armory is used for recreation programs and leagues sponsored by the City; acts as a meeting place for local non-profit groups such as the Ionia Lions club, Ionia Area Chamber of Commerce and Ionia Within 30 days of Within 120 days of notification notification $ Ionia Armory Community Center Renovations Ambassadors.

200,000 N/A

d e tt

t i m

Washington Street Municipal Parking Lot

Lafayette Street Infrastructure Upgrades

PROJECT #4 This project proposes the reconstruction of Lafayette Street in the City of Ionia so that water / sanitary sewer / storm sewer utilities may be replaced. A recent City Water System Master Plan revealed the need to upgrade / oversize the water main that is located along Lafayette street primarily to improve fire protection flows in served neighborhoods and water service reliability to Ionia county Memorial Hospital. Recent analysis also revealed the need to replace the aging sanitary and storm sewer mains located under Lafayette Street due to capacity concerns.

ub

City of Ionia

City of Ionia

02262009

q e R

PROJECT #5 The project proposed the construction of a municipal parking lot on West Washington Street in downtown Ionia to serve the businesses located along the north side of Main street. This area currently lacks off-street municipal parking which hampers the re-sale and sale-ability of buildings located along these several blocks. The City proposed to redevelop a brownfield site into a 100 space municipal parking Within 120 days lot. of notification

S City of Ionia

Project Description

Expected Completion Date

Submitted Requests - Not Approved

Within 240 days of notification $

$

800,000 N/A

3,250,000 Lafayette Street

109 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ionia

City of Ionia

City of Iron Mountain

City of Iron Mountain

City of Iron Mountain

City of Iron Mountain

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Ionia Wastewater Treatment Plant Facility Improvements

PROJECT #3 The Ionia Area Wastewater Treatment Facility provides wastewater treatment services to the City of Ionia and Berlin, Easton, Ionia and Orange Townships. The facility also provides services to the five state of Michigan Department of Corrections facilities (prisons) located in Ionia. Originally constructed in 1965 and upgraded / expanded in 1991, a recent facilities assessment commissioned by the owners revealed that the facility needs $7 million in mechanical Within 120 days upgrades / component replacement in the next 5-7 years. of notification

F Street Sewer Replacement

The City of Iron Mountain has completed a series of combined sewer separation projects. However there are still sewers located in the City that are combined sanitary and storm. One such area is West F Street located between Kimberly and Carpenter Avenue. The proposed improvements include the separation of the deteriorated combined sewer on West F Street, the replacement of watermain from Kimberly Avenue to Prospect Avenue, and associated storm sewer construction resulting in the separation of the combined sewer as shown on the attached drawing. This area has been included within proposed project planning and design stages, however has not been constructed due to budget constraints. 7/1/2009

11/1/2009

$

350,000

Lehman Avenue Sewer Installation

The proposed project includes the installation of new sanitary sewers to an unsewered portion of the City of Iron Mountain along Lehman Avenue. This area contains a large Resort which currently operates its own on-site treatment facility. A key factor of importance for this project is the fact that this area is within the City's Wellhead Protection Area for its only water system production wells. Therefore the installation of sewers in this area is an important step in protecting the City's current aquifer. 9/1/2009

9/1/2010

$

1,315,000

In 2007 the City of Iron Mountain completed a Project Plan through the Michigan Department of Environmental Quality’s (MDEQ) State Revolving Fund (SRF) program. This Project Plan included an evaluation of the City’s Sanitary Sewer System and identified system needs. The Project Plan identified six (6) Principal Project Alternatives (phases) which were recommended to be completed. They are as follows: The W Pump Station phase which includes the complete reconstruction of the sanitary sewer pump station located on West B Street. The East A Street Sewer phase which includes the replacement of deteriorated collection piping on East A Street. Pump Station Radio Telemetry phase which includes the installation of radio telemetry equipment at each of the City’s pump stations and provisions for integration into the existing radio control panel at the DPW building. The backup power phase which includes the installation of generator receptacles at all the City’s remaining pump stations and the procurement of a portable Generator to provide backup power. The West B and West C Street phase which includes the replacement of deteriorated 9/1/2009

11/1/2010

$

1,583,000

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES recommended that the City install a radio telemetry system at all three (3) lift stations to provide greater reliability in the event of a problem with the lift stations. Currently the City only has one (1) lift station with a telephone dialer that is working properly. This project will provide greater reliability and faster response in an emergency and eliminate dedicated phone lines to each lift station which is extremely costly. This project entails the full replacement of the existing lift station telemetry with radio telemetry. 6/1/2009

10/1/2009

$

45,000

T O

P P A

N s

t s e

D VE

Within 365 days of notification $

O R

Route (Infrastructure Only)

7,000,000 N/A

u q e

R d

City of Iron Mountain

City of Iron Mountain

i m

b u S City of Iron River

City of Iron River

02262009

e t tt

City Wide Sewer System Improvements Project

Sanitary Sewer Lift Station Telemetry

Submitted Requests - Not Approved

110 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Expected Completion Date

Local Street Resurfacing & Reconstruction

The City of Iron River's local streets are severely deteriorated and have been patched numerous times over the past 50 years. Most of the local roads were paved during the mining days and are way past their useful life. The proposed project would entail cold milling and resurfacing with new ashpalt pavement. This project could begin immediately after funding becomes available as no significant design or permits will be required. 5/1/2009

City Hall building restoration and enrgy improvements

The three-story Iron River City Municipal building was constructed in 1914. It houses the usual municipal offices and the top floor is used for young adult programs in conjunction with the local school system. In the mid 50’s, all the original windows were replaced with glass block. The buildings’ roof is constructed of a non-insulated wood deck covered with tar. The roofing material has been replaced with a modern membrane roof, but remains inadequately insulated. The building exterior has fallen into a state of disrepair. In this project, all windows will be replaced with high energy rated windows which resemble the appearance of the original units. The roof will be properly insulated to reduce heat loss and gain. The building exterior will be cleaned, the mortar joints tuck pointed, defective or missing bricks replaced, and the loose fascia and cornice repaired. 5/1/2009

GIS Development and Implementation

D VE $

2,500,000

9/15/2009

$

390,000

The City of Iron River has been developing a Geographic Information System (GIS) to accurately record mapping records, locations of valves and hydrants, record operating costs and ages of electrically operated pumps and equipments, map resident locations, and assist in the management of many other community assets. The City wishes to continue working with its consultant to continue improving this system. The successful development and implementation of this program will result in engergy savings, enhanced emergency response time, and increased reliability of the many utilities the City operates. The estimated project cos to complete the implementation of this program is $90,000. This project is "shovel ready" and can continue to proceed as soon as funds are available. 5/1/2009

9/15/2009

$

90,000

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. Based on the aged condition of the electrical service and controls at the Ice Lake Lift Station the SSES recommended that improvements be made to this lift station. It was also recommended that a permanent on-site backup power generator also be installed due to the inability of the City’s Department of Public Works (DPW) to access this lift station by vehicle all year round due to its location. This project entails the construction of a new control panel, site electrical upgrades, on-site standby generator, and sealing of the wet well penetrations. 6/1/2009

10/1/2009

$

46,000

T O

11/15/2009

Funding Request

P P A

O R

Route (Infrastructure Only)

N s

City of Iron River

City of Iron River

t s e

u q e

R d

City of Iron River

City of Iron River

i m

b u S 02262009

e t tt

Ice Lake Sanitary Sewer Lift Station Improvements

Submitted Requests - Not Approved

111 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Lay Avenue Streetscape and Street Reconstruction

The proposed Lay Avenue Streetscape Enhancement portion of this project is intended to improve the aesthetics along Lay Avenue from Amber Street north to Highway US-2 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings, corner enhancements, major gateways and a traffic circle (round-a-bout) will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the project. The proposed project would also entail full reconstruction of Lay Avenue from Highway US-2 north to Franklin Street and Franklin Street from Lay Avenue west to River Avenue which includes subgrade undercutting, subbase, aggregate base, new bituminous pavement, ADA sidewalks and ramps, and general restoration. This p5/1/2009

Ice Lake Sanitary Sewer Lift Station Improvements

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. Based on the aged condition of the electrical service and controls at the Ice Lake Lift Station the SSES recommended that improvements be made to this lift station. It was also recommended that a permanent on-site backup power generator also be installed due to the inability of the City’s Department of Public Works (DPW) to access this lift station by vehicle all year round due to its location. This project entails the construction of a new control panel, site electrical upgrades, on-site standby generator, and sealing of the wet well penetrations. 6/1/2009

T O

City of Iron River

City of Iron River

City of Iron River

City of Iron River

City of Iron River

02262009

tt i m

b u S

City of Iron River

d e t

Sanitary Sewer Lift Station Telemetry

Local Street Resurfacing & Reconstruction

O R

P P A

N s

st

e u

Expected Completion Date

11/15/2009

10/1/2009

The City of Iron River's local streets are severely deteriorated and have been patched numerous times over the past 50 years. Most of the local roads were paved during the mining days and are way past their useful life. The proposed project would entail cold milling and resurfacing with new ashpalt pavement. This project could begin immediately after funding becomes available as no significant design or permits will be required. 5/1/2009

11/15/2009

Submitted Requests - Not Approved

D VE $

1,330,000

10/1/2009

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES recommended that the City install a radio telemetry system at all three (3) lift stations to provide greater reliability in the event of a problem with the lift stations. Currently the City only has one (1) lift station with a telephone dialer that is working properly. This project will provide greater reliability and faster response in an emergency and eliminate dedicated phone lines to each lift station which is extremely costly. This project entails the full replacement of the existing lift station telemetry with radio telemetry. 6/1/2009

q e R

Funding Request

Route (Infrastructure Only)

112 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Lay Avenue Streetscape and Street Reconstruction

The proposed Lay Avenue Streetscape Enhancement portion of this project is intended to improve the aesthetics along Lay Avenue from Amber Street north to Highway US-2 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings, corner enhancements, major gateways and a traffic circle (round-a-bout) will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the project. The proposed project would also entail full reconstruction of Lay Avenue from Highway US-2 north to Franklin Street and Franklin Street from Lay Avenue west to River Avenue which includes subgrade undercutting, subbase, aggregate base, new bituminous pavement, ADA sidewalks and ramps, and general restoration. This p5/1/2009

City Hall building restoration and enrgy improvements

The three-story Iron River City Municipal building was constructed in 1914. It houses the usual municipal offices and the top floor is used for young adult programs in conjunction with the local school system. In the mid 50’s, all the original windows were replaced with glass block. The buildings’ roof is constructed of a non-insulated wood deck covered with tar. The roofing material has been replaced with a modern membrane roof, but remains inadequately insulated. The building exterior has fallen into a state of disrepair. In this project, all windows will be replaced with high energy rated windows which resemble the appearance of the original units. The roof will be properly insulated to reduce heat loss and gain. The building exterior will be cleaned, the mortar joints tuck pointed, defective or missing bricks replaced, and the loose fascia and cornice repaired. 5/1/2009

T O

City of Iron River

City of Iron River

City of Iron River

City of Iron River

d e tt

t i m

GIS Development and Implementation

b u S City of Iron River

City of Iron River

02262009

High Priority Sanitary Sewer Pipe Replacement for I/I Removal

q e R

O R

P P A

N s

st

e u

Expected Completion Date

D VE

11/15/2009

9/15/2009

The City of Iron River has been developing a Geographic Information System (GIS) to accurately record mapping records, locations of valves and hydrants, record operating costs and ages of electrically operated pumps and equipments, map resident locations, and assist in the management of many other community assets. The City wishes to continue working with its consultant to continue improving this system. The successful development and implementation of this program will result in engergy savings, enhanced emergency response time, and increased reliability of the many utilities the City operates. The estimated project cos to complete the implementation of this program is $90,000. This project is "shovel ready" and can continue to proceed as soon as funds are available. 5/1/2009

9/15/2009

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES identified several improvements to the sanitary sewer system for removal of additional I/I which was designated as a lower priority to the highest priority pipe replacement for excessive I/I removal. These improvements were identified due to infiltration being present during televising and recommended for replacement as soon as funds become available. This project entails the construction of approximately 2,200 linear feet of sanitary sewer main, replacement of sanitary sewer laterals within the public R.O.W., new sanitary sewer manholes and general landscape and public street reconstruction. 9/1/2009

10/1/2010

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

$

609,000

113 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Sanitary Sewer Pipe Replacement for Structural Reasons

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES identified improvements to the sanitary sewer system where the existing piping is in need of replacement due to structural reasons. These improvements were recommended in the SSES and should be undertaken by the City as soon as funding becomes available. These sanitary sewers are severely deteriorated and are susceptible to collapsing at any time. This project entails the construction of approximately 5,400 linear feet of sanitary sewer main, replacement of sanitary sewer laterals within the public R.O.W., new sanitary sewer manholes and general landscape and public street reconstruction. 9/1/2009

Riverside Sanitary Sewer Lift Station Replacement

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES recommended that the Riverside Lift Station be completely replaced in the near future due to the deteriorating condition of the wet well. The controls and electrical system are operational for now but are antiquated and in need of replacement once funds become available. This lift station is critical in serving as it serves the largest commercial development along with a laundromat and hospital. The failure of this lift station could have dire consequences. This project entails the full replacement of this lift station including new controls and electrical system upgrades, new wet well and valve vault, new pumps and valves, and 300 linear feet of HDPE forcemain to be directionally bored beneath the Iron River. 9/1/2009

City of Iron River

928,000

7/1/2010

$

225,000

This Homer Road septic tank and drain field site has been under scrutiny from the MDEQ in recent years due to high flows and elevated levels of pollutants observed in groundwater samples. Due to these reasons, the connection of this sewered area to the City’s Central District is a priority and should be constructed as soon as funds become available. This project entails the construction of approximately 5,200 linear feet of sanitary sewer main, 14 new sanitary sewer manholes, 3,500 linear feet of HDPE sanitary sewer forcemain, two (2) new sewer lift stations, backup standby power generator, and general landscape and public street reconstruction. 9/1/2009

City of Iron River

d e t

North District Sanitary Sewer Connection

10/1/2010

$

920,000

The City of Iron River’s Hunter Road water system is in need of system upgrades and improvements to improve reliability. Currently this water system does not have a backup well. The MDEQ is requiring the City to provide mechanical reliability for this water system which entails the construction of a new water well, well house, and transmission main. The City’s current telemetry system for the entire water system consists of dedicated phone lines for each site (total of 7) which is not very reliable and is costly to operate each month. It has been identified that the City replace this antiquated telemetry system with a radio system which is more reliable and more cost effective to operate. Past studies also identified other system improvements in its Central District water system consisting of watermain replacement due to deteriorated piping which is an ongoing maintenance problem along with eliminating several deadend water mains to reduce the potential for these water lines to freeze during winter months and to improve water quality in these areas. 9/1/2009

tt i m

b u S City of Iron River

City of Iron River

02262009

Water Distribution System Improvements

10/1/2010

$

950,000

q e R

P P A

N s

st

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

e u

City of Iron River

O R

Funding Request

10/1/2010

T O

City of Iron River

Expected Completion Date

114 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Highest Priority Sanitary Sewer Pipe Replacement for Excessive I/I Removal

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. This SSES identified several projects where improvements to the sanitary sewer system which must be made in order to remove excessive I/I in a sufficient amount to meet the conditions for their current Administrative Consent Order (ACO). It is estimated these improvements will remove enough I/I so that the City can meet the flow requirements set by West Iron County Sewer Authority (WICSA) for a 25 Year, 24 Hour storm event and allow all three (3) of the City’s lift stations to be able to pump the flows for the same storm event with the largest pump out of service. These improvements included areas where complete sanitary sewer pipe replacement was recommended along with areas where catch basins are still connected to the sanitary sewer system and need to be disconnected. This project entails the construction of approximately 13,500 linear feet of sanitary sewer main, 3,100 linear feet of sanitary sewer laterals, 79/1/2009

Washington Avenue Reconstruction

This project entails the reconstruction of Washington Avenue from Evergreen Street to Amber Street which is approximately 1,500 linear feet of roadway. This roadway is in very poor condition and badly in need of reconstruction. The existing asphalt and concrete pavement will be removed along with the existing sidewalks and curb and gutter. The roadway will be reconstructed to the cross section as identified in the City’s Streetscape Master Plan which includes narrowing the roadway and widening the sidewalks to provide greater walkability of this downtown area. New subbase and aggregate base will be constructed along with new asphalt, curb and gutter, concrete sidewalk, and decorative sidewalk pavers to keep with the City’s Streetscape Master Plan. 9/1/2009

T O

City of Iron River

City of Iron River

City of Iron River

d e tt

t i m

Highest Priority Sanitary Sewer Pipe Replacement for Excessive I/I Removal

City of Iron River

ub

S City of Iron River

City of Iron River

02262009

High Priority Sanitary Sewer Pipe Replacement for I/I Removal

O R

P P A

N s

st

e u

Expected Completion Date

$

2,209,000

10/1/2010

$

1,691,000

10/1/2010

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES identified several improvements to the sanitary sewer system for removal of additional I/I which was designated as a lower priority to the highest priority pipe replacement for excessive I/I removal. These improvements were identified due to infiltration being present during televising and recommended for replacement as soon as funds become available. This project entails the construction of approximately 2,200 linear feet of sanitary sewer main, replacement of sanitary sewer laterals within the public R.O.W., new sanitary sewer manholes and general landscape and public street reconstruction. 9/1/2009

10/1/2010

Submitted Requests - Not Approved

D VE

10/1/2010

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. This SSES identified several projects where improvements to the sanitary sewer system which must be made in order to remove excessive I/I in a sufficient amount to meet the conditions for their current Administrative Consent Order (ACO). It is estimated these improvements will remove enough I/I so that the City can meet the flow requirements set by West Iron County Sewer Authority (WICSA) for a 25 Year, 24 Hour storm event and allow all three (3) of the City’s lift stations to be able to pump the flows for the same storm event with the largest pump out of service. These improvements included areas where complete sanitary sewer pipe replacement was recommended along with areas where catch basins are still connected to the sanitary sewer system and need to be disconnected. This project entails the construction of approximately 13,500 linear feet of sanitary sewer main, 3,100 linear feet of sanitary sewer laterals, 79/1/2009

q e R

Funding Request

Route (Infrastructure Only)

115 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Sanitary Sewer Pipe Replacement for Structural Reasons

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES identified improvements to the sanitary sewer system where the existing piping is in need of replacement due to structural reasons. These improvements were recommended in the SSES and should be undertaken by the City as soon as funding becomes available. These sanitary sewers are severely deteriorated and are susceptible to collapsing at any time. This project entails the construction of approximately 5,400 linear feet of sanitary sewer main, replacement of sanitary sewer laterals within the public R.O.W., new sanitary sewer manholes and general landscape and public street reconstruction. 9/1/2009

Riverside Sanitary Sewer Lift Station Replacement

The City of Iron River completed a Sanitary Sewer Evaluation Study (SSES) in June o 2008 which was required by the MDEQ S2 SRF Project Plan Requirements due to excessive Infiltration/Inflow (I/I) in the existing sanitary sewer system. The SSES recommended that the Riverside Lift Station be completely replaced in the near future due to the deteriorating condition of the wet well. The controls and electrical system are operational for now but are antiquated and in need of replacement once funds become available. This lift station is critical in serving as it serves the largest commercial development along with a laundromat and hospital. The failure of this lift station could have dire consequences. This project entails the full replacement of this lift station including new controls and electrical system upgrades, new wet well and valve vault, new pumps and valves, and 300 linear feet of HDPE forcemain to be directionally bored beneath the Iron River. 9/1/2009

T O

City of Iron River

City of Iron River

City of Iron River

City of Iron River

d e t

North District Sanitary Sewer Connection

tt i m

b u S City of Iron River

City of Iron River

02262009

Water Distribution System Improvements

O R

P P A

N s

st

e u

Expected Completion Date

7/1/2010

10/1/2010

The City of Iron River’s Hunter Road water system is in need of system upgrades and improvements to improve reliability. Currently this water system does not have a backup well. The MDEQ is requiring the City to provide mechanical reliability for this water system which entails the construction of a new water well, well house, and transmission main. The City’s current telemetry system for the entire water system consists of dedicated phone lines for each site (total of 7) which is not very reliable and is costly to operate each month. It has been identified that the City replace this antiquated telemetry system with a radio system which is more reliable and more cost effective to operate. Past studies also identified other system improvements in its Central District water system consisting of watermain replacement due to deteriorated piping which is an ongoing maintenance problem along with eliminating several deadend water mains to reduce the potential for these water lines to freeze during winter months and to improve water quality in these areas. 9/1/2009

10/1/2010

Submitted Requests - Not Approved

D VE

10/1/2010

This Homer Road septic tank and drain field site has been under scrutiny from the MDEQ in recent years due to high flows and elevated levels of pollutants observed in groundwater samples. Due to these reasons, the connection of this sewered area to the City’s Central District is a priority and should be constructed as soon as funds become available. This project entails the construction of approximately 5,200 linear feet of sanitary sewer main, 14 new sanitary sewer manholes, 3,500 linear feet of HDPE sanitary sewer forcemain, two (2) new sewer lift stations, backup standby power generator, and general landscape and public street reconstruction. 9/1/2009

q e R

Funding Request

Route (Infrastructure Only)

116 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Washington Avenue Reconstruction

This project entails the reconstruction of Washington Avenue from Evergreen Street to Amber Street which is approximately 1,500 linear feet of roadway. This roadway is in very poor condition and badly in need of reconstruction. The existing asphalt and concrete pavement will be removed along with the existing sidewalks and curb and gutter. The roadway will be reconstructed to the cross section as identified in the City’s Streetscape Master Plan which includes narrowing the roadway and widening the sidewalks to provide greater walkability of this downtown area. New subbase and aggregate base will be constructed along with new asphalt, curb and gutter, concrete sidewalk, and decorative sidewalk pavers to keep with the City’s Streetscape Master Plan. 9/1/2009

Highway US-2 Streetscape Enhancements

As the City of Iron River’s Downtown Development Authority (DDA) moves forward with preliminary layouts for the River District and overall Streetscape Master Plan completed in 2007, and the Iron River Cool Cities Downtown Blueprint 2006, an opportunity exists to combine the efforts with the proposed MDOT Highway US-2 reconstruction project and other City infrastructure projects. The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Highway US-2 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, and major gateways will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the pr 5/1/2010

T O

City of Iron River

City of Iron River

City of Iron River

City of Iron River

t i m

ub

S City of Iron River

City of Iron River

02262009

Old Town District Streetscape

D VE

N s

11/15/2010

$

1,800,000

As the City of Iron River’s Downtown Development Authority (DDA) moves forward with preliminary layouts for the River District and overall Streetscape Master Plan completed in 2007, and the Iron River Cool Cities Downtown Blueprint 2006, an opportunity exists to combine the efforts with the proposed MDOT Highway M-189 reconstruction project and other City infrastructure projects. The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Highway M-189 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, and major gateways will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the pr 5/1/2010

11/15/2010

$

850,000

The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Genesee Street from Hwy M-189 west to Sixth Avenue within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, and an urban street plaza will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and wayfinding signage for tourists are also important components of the project. 5/1/2010

11/15/2010

$

375,000

q e R

Highway M-189 Streetscape Enhancements

O R 10/1/2010

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

st

e u

d e tt

Expected Completion Date

117 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Business District Streetscape

The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Genesee Street from Hwy M-189 east to River Avenue within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements and "pocket parks" will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the project. 5/1/2010

City of Iron River

River District Streetscape

O R

Funding Request

$

1,350,000

The proposed City Streetscape Enhancement project is intended to improve the aesthetics along River Avenue from Hwy US-2 south to Genesee Street and Genesee Street from River Avenue east to Highway US-2 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, major gateways and a traffic circle (round-a-bout) will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the project. 5/1/2010

11/15/2010

$

1,500,000

As the City of Iron River’s Downtown Development Authority (DDA) moves forward with preliminary layouts for the River District and overall Streetscape Master Plan completed in 2007, and the Iron River Cool Cities Downtown Blueprint 2006, an opportunity exists to combine the efforts with the proposed MDOT Highway US-2 reconstruction project and other City infrastructure projects. The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Highway US-2 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, and major gateways will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the pr 5/1/2010

11/15/2010

N s

t s e

P P A

Route (Infrastructure Only)

D VE

11/15/2010

T O

City of Iron River

Expected Completion Date

u q e

R d

City of Iron River

City of Iron River

i m

b u S 02262009

e t tt

Highway US-2 Streetscape Enhancements

Submitted Requests - Not Approved

118 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Iron River

City of Iron River

Project Name

Project Description

Start Date

Highway M-189 Streetscape Enhancements

As the City of Iron River’s Downtown Development Authority (DDA) moves forward with preliminary layouts for the River District and overall Streetscape Master Plan completed in 2007, and the Iron River Cool Cities Downtown Blueprint 2006, an opportunity exists to combine the efforts with the proposed MDOT Highway M-189 reconstruction project and other City infrastructure projects. The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Highway M-189 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, and major gateways will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the pr 5/1/2010

Old Town District Streetscape

The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Genesee Street from Hwy M-189 west to Sixth Avenue within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, and an urban street plaza will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and wayfinding signage for tourists are also important components of the project. 5/1/2010

T O

City of Iron River

City of Iron River

City of Iron River

City of Iron River

d e tt

t i m

Business District Streetscape

b u S City of Iron River

City of Iron River

02262009

River District Streetscape

q e R

O R

P P A

N s

st

e u

Expected Completion Date

D VE

11/15/2010

11/15/2010

The proposed City Streetscape Enhancement project is intended to improve the aesthetics along Genesee Street from Hwy M-189 east to River Avenue within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements and "pocket parks" will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the project. 5/1/2010

11/15/2010

The proposed City Streetscape Enhancement project is intended to improve the aesthetics along River Avenue from Hwy US-2 south to Genesee Street and Genesee Street from River Avenue east to Highway US-2 within the City of Iron River and maintain the themes of the City’s Streetscape Master Plan and Cool Cities Downtown Blueprint, improve the walk-ability within the City’s Downtown, and provide furnishings for recreational enhancement. Decorative sidewalk paving, improved street lighting, barrier-free ramps at intersections, stop bars and striping delineation at crosswalks, decorative plantings (street trees, bushes), corner enhancements, major gateways and a traffic circle (round-a-bout) will be the main components of the enhancement projects. Welcome signs, decorative street signs, banners, and way-finding signage for tourists are also important components of the project. 5/1/2010

11/15/2010

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

119 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ishpeming

Ishpeming, MI

Project Name

Project Description

Start Date

Ishpeming Area Wastewater Treatment Facility, Class "A" Sludge Addition

The Ishpeming Area Joint Wastewater Treatment Facility is in the process of final design for a biosolids dryer to produce a class "A" exceptional quality biosolids product. This product will be used for soil enhancement to the general public. The reuse of these biosolids will eliminate the disposal to the county landfill, therefore prolonging the life of the landfill and saving taxpayers as well as user of this system money. The project costs have been estimated at $1,496,000.00. The dryer will reduce the biosolids to 90% solids from the current 14% solids. This facility is owner by the City of Ishpeming and the Township of Ishpeming and currently serves approximately 8,500 users. This facility is also used by the area communities for disposal of their septage, the landfill for leachate disposal as needed and MDOT for disposal of their highway catch basin sediment. 7/1/2009

Partridge Creek Diversion

Replace existing failed brick 66"-78"storm sewer. Originally constructed as a combined sewer in the 1800's, it also enclosed Partridge Creek which flowed through the central business district of Ishpeming. In 1971, at the request of the Michigan Department of Public Health, the flow from Partridge Creek was diverted into the inactive underground mine workings which discharged to Carp Creek and subsequently Deer Lake and then to Lake Superior. In 2006, a court orded consent judgment required that Partridge Creek be diverted from the underground mine works to eliminate mercury discharges to Carp Creek, Deer Lake, and Lake Superior. Deer Lake is a federally designated Area-Of-Concern. Before Partridge Creek is diverted back to the City sewer, it must be rebuilt. An engineering study has been completed which recommends a 12' by 6' box culvert. This project would include the restoration of 3000' of stream which is presently enclosed. 7/1/2009

City of Ishpeming

City of Ishpeming

City of Ishpeming

Ishpeming, MI

Ishpeming, MI

Ishpeming Senior Center Heating System Improvements

Ishpeming, MI

DPW Garage, Firehall and Police Station Complex Heating and Lighting System upgrades

Ishpeming, MI

02262009

S

ub

tt i m

d e t

Utility Service to US 41 Commercial Development West

O R

Funding Request

$

1,496,000

11/15/2010

$

9,920,000

The existing boilers ars standard effciency, natural gas fueled boilers which do not have adequate capacity to heat the building above 63 degrees during cold weather conditions. New, high efficiency boilers will have adequate heating capacity and use less fuel than presently being consumed. 5/1/2009

10/15/2009

$

65,000

Existing complex has inefficient boilers, old lighting, old windows and old overhead doors. Boilers to be replaced with multiple, high efficiency natural gas fired units. Infloor radiant heating to be installed where applicable to reduce lost heat. Windows to be upgraded to energy saving thermopanes. Lighting system to be replaced with energy saving fixtures. 6/1/2009

11/15/2009

$

897,500

Install 3,060 feet of 8" & Sanitary Sewer and 3,090 feet of DI Water Main to provide service to proposed commercial development to employ 75 people at two 40 room motels, a 120 seat restaurant and a 6 module strip mall. Land owner/developer has demonstrated success with the Country Village Shopping Center located " mile East of this parcel. Development is not possible until water and sewer service are extended to this area. This new development will be constructed by local contractors and will serve both local residents and tourists, providing both short term and long term employment. 6/1/2009

11/15/2009

$

679,000

N s

st

e u

q e R

P P A

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

5/1/2010

T O

City of Ishpeming

Expected Completion Date

120 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ishpeming

Ishpeming, MI

Project Name

Project Description

Start Date

Flood Relief-Second and Third Streets

Replacement and upgrading of 850 feet of existing road and alley surface and 1,750 feet of storm sewer and 650 feet of Cast Iron water main. All storm sewer and water main have approximately 90 years of continuous service and have outlived their design life. Residences and businesses served by the under sized storm sewer are subject to flooding in the spring when large snow melts lead to heavy runoff or during heavy rain event. This flooding causes annual expense to the City in the form of property damage claims against the City, additional City labor costs and inconvenience to local business people and residences. The cast iron water mains currently serving 2nd Street have brittled with age and are subject to catastrophic breaking, leading to interruption of service to local residences and businesses. Replacement of the cast iron with new, ductile iron water main would increase the reliability of the system. The project can be ready for construction within 90 days after funding is available and will provide instant jobs for local contractors and sales for local suppliers. 6/1/2009

City of Ishpeming

Ishpeming, MI

Hematite Drive & Malton Road Infrastructure and road construction

890,000

Construction of 11,800 feet of bituminous roadway and associated storm water drainage. Also install 9,800 feet of 8" DI watermain and 8,800 feet of sanitary sewer. This would provide access and infrastructure to a presently vacant 600 acre parcel of property which the city purchased from the mining company and enable planned development to take place. This development would include up to 200 single family residences, multi family residential units, professional offices and general commercial development. In addition to the jobs created during the actual construction of the roadway, there will be a long term increase in employment by local contractors as the development takes place. There will also be increased long term employment related to the professional offices, commercial development. 9/1/2009

11/15/2010

$

3,027,000

Replace 8,500 feet of existing paved street, 4,200 feet of storm sewer and 9,000 feet of CI water main (both) approximately 90 years old). Street pavement, curbs, sidewalks, curb inlets and storm sewer will be replaced. Existing sanitary sewer is in good condition. Water main is subject to failure and in constant need of repair. Asphalt pavement is deteriorated and patched from water main repairs. Both streets are certified as Major Streets on the Ishpeming street system and provide access between US 41 and the downtown commercial area. More that 200 homes and businesses front on these streets. New water mains will increase pressure and reduce operating costs. Asphalt surface will be removed and recycled, handicapped ramps will be constructed at intersections. 7/1/2009

11/15/2010

$

4,490,000

Infrastructure Expansion to serve Proposed Wabash Heights Subdivision (20 lots)

Extend streets, water and sanitary sewer to serve proposed 20 lot residential subdivision. City purchased property from the mining company and has a developer planning to build residential houses. Project is stalled until infrastructure improvements can be constructed. Site is adjacent to existing residential development which minimizes infrastructure costs. City has minimal land suitable for residential development.Extend streets, water and sanitary sewer to serve proposed 20 lot residential subdivision 6/1/2009

11/15/2009

$

414,000

Water Main Replacement

Replace and Upgrade Watermain Service Lines

4/13/2009

6/19/2009

$

d e tt

t i m

ub

st

e u

q e R

N s

City of Ishpeming

Ishpeming, MI

City of Ithaca

City of Ithaca

City of Ithaca

City of Ithaca

Water and Sewer System Telemetry

Alarm/monitoring System for City Wells, Water Towers and Lift Stations

1/2/2009

2/28/2009

$

City of Ithaca

City of Ithaca

Production Well

New Production Well to provide water service to residents

1/22/2009

4/30/2009

$

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

Second & Third Street Infrastructure Improvements

Ishpeming, MI

P P A

O R

Funding Request

11/15/2009

T O

City of Ishpeming

Expected Completion Date

Multiple City 280,000 Locations Mulitiple City 250,000 locations Center St and 200,000 Union Rd

121 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City of Ithaca

City of Ithaca

St. Johns Street Sanitary Sewer Extension

City of Ithaca City of Ithaca

City of Ithaca City of Ithaca

Water Metering System Wastewater Lagoon

Project Description

Start Date

Extend Sanitary Sewer to current residents, businesses and potential housing development possibilities Install a Fixed Based Network meter reading system for more efficient monitoring of water consumption, resources and loss control Upgrade Controls on Lagoon Sanitary Lift Station

1/20/2009

6/15/2009

5/1/2009 6/1/2009

7/1/2009 7/10/2009

City of Ithaca

City of Ithaca

Road Reconstruction

Crush and Shape HMA Pavement

City of Ithaca

City of Ithaca

Sidewalk and Crossing Replacements

City of Ithaca City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Ithaca City of Kalamazoo City of Kalamazoo City of Kalamazoo

Industrial Park Storm Water Detention Pond

City of Kalamazoo

City of Kalamazoo

Replace and Upgrade Sidewalks and Crossings to meet ADA requirements 5/4/2009 Installation and creation of a Storm Water Detention Pond for Growing Michigan Certified Industrial Park 10/15/2008 Riverview Lift Station - Renovation and Equipment Upgrade Gravity Sanitary Sewer to replace Burke Court Ejector Station Parking system infrastructure improvements Water Pumping Station Improvements and replacement of building station structures and equipment

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

Replacement of deteriorated equipment and facilities at Water Reclamation Plant, including Raw Sewage Pumps, Site Heat loop system and other major equipment Intersection Improvements at Parkview Avenue and Oakland Drive - widen to Improve capacity and safety

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

Arboretum Parkway/Solon/Howard Intersection Improvements (2 roundabouts) Portage Street Streetscape, Phase I

City of Kalamazoo

City of Kalamazoo

Secondary Process Improvements - Enhanced Biological Phosphorus Removal System and fine bubble aeration system. Significant energy savings of $500,000/yr.

City of Kalamazoo

City of Portage

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

Water Pump Station #8

City of Kalamazoo City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

02262009

tt i m

ub

S

City of Kalamazoo City of Kalamazoo

P P A

-N

e u

d e t

q e R

O R

5/4/2009

T O

s t s

Expected Completion Date

Funding Request

$

S St. Johns St between Webster 320,000 St and Fillmore Rd

$ $

275,000 Entire City 150,000 Center Street

D VE

6/19/2009

$

6/1/2009 6/1/2010 6/1/2010

$ $ $ $

Mulitiple City Blocks throughout 360,000 the City Mulitiple City 250,000 locations North Industrial 80,000 Park 281,000 406,000 580,000

$

900,000

12/31/2009

$

1,000,000

11/15/2010

$

1,300,000

7/15/2010

$ $

1,400,000 3,340,000

2/1/2011

$

8,000,000

3,500,000 200 E. Kilgore Rd.

6/30/2009

$

Replace existing Water Pump Station #8, including design & construction, with a new PS #8 on a recently purchased parcel adjacent to the existing pump station property. The new station will provide improved water quality through addition of iron removal and increased finishe water supply of 3 MGD. 1/30/2009 Design and construct a sewer from the Tertiary Mud well into the Recycle Pump Station Paving of cemetery roads Energy efficient lighting renovations for City Hall and other City Building Edwards Street conversion to two-way Replace lead water services Placement of sidewalk in areas where sidewalk is defici

9/1/2010

$

10/1/2009 11/15/2009 12/31/2009 11/15/2009 11/15/2009 11/15/2009

$ $ $ $ $ $

75,000 100,000 200,000 218,000 223,000 240,000

City Hall Improvements - Roof replacement, security system installation - Upgrade deteriorated Budget & Accounting facilities and Treasury Dept. ADA Upgrade. Upgrade City Centrex Phone System Replace the three existing bar screens in the Raw Pump Building

9/1/2010 4/1/2010

$ $

570,000 773,000

6/1/2010

$

920,000

11/15/2009 12/31/2009 11/15/2009 7/1/2010

$ $ $ $

2,000,000 2,400,000 3,000,000 3,500,000

Painting of exterior of Mt. Olivet, Dartmouth, and Edgemoor water storage tanks New and replacement Water Main as a result of Public Works projects or substandard main due to size, condition Arcadia Trunk Sanitary Relief Sewer - Ransom Street Citywide ADA Sidewalk Ramp Improvements Replacement of Water Pumping Station #8

Submitted Requests - Not Approved

Route (Infrastructure Only)

122 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

Project Description Bronson Park Improvements - Install 17 above ground pedestals with electric receptacles and timers New Process Analyzers for Phosphorus levels Water Street (Pitcher to Kalamazoo) Mill and resurface Water Pumping System - Replacement of old and worn pump and motors that can not be repaired

City of Kalamazoo

City of Kalamazoo

Computer hardware and software for water and wastewater support staff

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

T O

e u

st

d e tt

ub

t i m

q e R

Submitted Requests - Not Approved

10/1/2009 8/1/2009 11/15/2009

Funding Request $ $ $

35,000 50,000 51,000

$

70,000

$

130,000

$ $ $ $ $

150,000 252,000 260,000 265,000 278,000

11/15/2009 11/15/2009

$ $

300,000 315,000

12/1/2009 11/15/2009 12/31/2009 12/31/2009

$ $ $ $

320,000 400,000 500,000 1,425,000

$ $ $

77,000 80,000 96,000

$ $ $ $ $

128,100 175,000 250,000 274,568 285,555

$ $

325,000 502,000

$ $ $

550,000 562,000 610,000

$

700,000

$

750,000

$ $ $ $

800,000 880,000 1,250,000 1,500,000

$ $

1,785,030 1,900,000

12/1/2009

O R

P P A

Update deteriorated instrumentation, variable frequency drives, actuators, controls and electrical equipment at the Water Reclamation Plant, as well as upgrade to telemetry to Lift Stations Parkview Avenue - Non-motorized pathway and bridge at Cherry Creek Install new tertiary screw pump with the open design in place of existing New and replacement sewers as well as the lining of sewers prone to I & Remarcite Kik Pool - New plaster in entire pool, repair and replace tiles in lane line, feather new plaster into gutter Axtell Creek (at National City) Stormwater Improvement Project Burr Oak Court Street & Streetscape Improvements Improvements to Soisson/Rapzez/Clason Field - New scoreboard, PA system, and Restroom Improvements Big Lots (Near Kilgore & Westnedge) Stormwater Improvement Project Stuart/Fairmount Community Center - Remodel and Renovations Portage Creek Urban Stormwater Treatment Project Portage Creek Milham Park Fish Passage Restoration Project Washington Square Neighborhood Retail Center - Renovation of an existing building in a State-designated "Cool Cities" target area N. Park & N. Westnedge Streetscape Improvements Demolition of Public Station #4 on Rose Street to green space and demolition of Cedar Street Training Center Sidewalk Replacement - N. Park & N. Westnedge (4 miles of sidewalk) Business Loop I-94 - Business Loop Gateway Improvements, Phase Crane Park - Redevelopment of park, demolition, ADA accessibility improvements, parking improvements & landscaping Northside Community Recreation Center - Renovation of an existing building in a State-designated "Cool Cities" target area Woods Lake - Redevelopment of park, demolition, walkways, ADA accessibility, restroom/shelter, play land, landscaping & park furnishings Additional (10) Public Safety Officers Home Weatherization for low-moderate income households Family Health Center Expansion KVET Multi-Jurisdictional Narcotics Task Force Operational Expenses (NonPersonnel) Replace Public Safety Fire Engine 5, Fire Engine 3, and Fire Truck 4

N s

Start Date

11/1/2009

Replace the remaining Distributed Control Units (DCU 2000s) with the updated DCU 3200s and upgrade conductor software to most recent revision Davis Street (Wheaton to Lovell Street) Mill and resurface Lovers Lane (Cork to Royce) Mill and resurface Reed Street (Burdick to Portage Street) Mill and resurface S. Burdick (Cork to Crescent Drive) Mill and resurface Scattered Site Paving: Milling and reconstruction of intersections and small sections of streets Cork Street (Burdick to W of Lovers Lane) Mill and resurface

S

02262009

Project Name

Expected Completion Date

12/1/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009

D VE

Route (Infrastructure Only)

123 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

City of Kentwood City of Kentwood

City of Kentwood City of Kentwood

City of Lansing City of Lansing

Lansing, City of Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

City of Lansing City of Lansing

Lansing, City of Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Project Name

Project Description Facility expansion of administrative office area as part of transition of Kalamazoo Metro Transit from a city department to the governance of a county-wide transit authority Acquire and install an integrated, comprehensive management/customer service automatic vehicle locator (AVL) system Construct 60' x 300' concrete and steel passenger canopy over the AMTRAK rail platform at the Kalamazoo Transportation Center Firearms Range at Public Safety Training Complex

Wastwater Collection System Improvements Water Distribution System Improvements Sign Shop/Sweeper Barn Energy Improvements Police Firing Range

P P A

e u

Energy Efficient Window Replacement; Replace Chiller Unit; Insulate Plaza Ceiling Area; Energy Management System; Lighting Control System; Mechanical Unit Replacement with Controls

City Hall Energy Improvements

$ $

4,000,000 5,000,000

$ $

600,000 3,000,000

12/9/2009 12/9/2009

$ $

35,000 90,000

12/9/2009

$

185,000

12/9/2009

$

185,000

12/9/2009

$

210,000

12/9/2009 12/9/2009

$ $

210,000 245,000

12/9/2009

$

285,000

12/9/2009

$

285,000

12/9/2009

$

285,000

eq

9/9/2009

9/10/2009

$

2,830,000

Modernization of City's 30 year old data center, new floor, new fire suppression system, improved environmental monitoring, video surveillance, enhanced security, HVAC improvements. Build New Fire Station and Training Center to Replace Obsolete Facilities Install redundant fiber optic voice/video/data communications network. To improve reliability of system, especially during disasters

6/9/2009 9/9/2009

12/9/2009 9/10/2009

$ $

750,000 3,200,000

6/9/2009

12/9/2009

$

1,000,000

Reconfigure intersection to provide center turn lane for MLK Jr. Blvd.

7/9/2009

9/9/2009

$

7/10/2009

$

Waverly Road Non-Motorized Pathway

Construct 5.5 mile non-motorized pathway between west city limits and US-127/I-496 8/9/2009 Construct 1.75 mile non-motorized pathway between Jolly Road and Moores River Drive 8/9/2009

12/9/2009

$

Hunter Blvd roundabout

Contruct roundabout at intersection

8/9/2009

12/9/2009

$

Holmes & Main intersection improvements

Contruct roundabout at intersection

8/9/2009

12/9/2009

$

595,000 Waverly Road Hunter Blvd & 50,000 Wildwood Holmes St & Main 500,000 St I-96 ramps/ Penn/American/ 7,750,000 Cedar/Edgewood

R d

City of Lansing City of Lansing

Lansing, City of Lansing, City of

Update Data Center New Fire Station

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

Redundant Fiber Optic System MLK Jr Blvd & Willow intersection Improvements Consumer's Right of Way Non-Motorized Pathway

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

City of Lansing

Lansing, City of

e t t

t i m

ub

S

s t s

-N

D VE

2,700,000

O R

Route (Infrastructure Only)

2,200,000

$

12/9/2009 12/9/2009

T O

Funding Request

$

Boiler with Controls 9/9/2009 Mechanical Unit Replacement with Controls 9/9/2009 Lighting Replacement with Control System; Boiler with Controls; Energy Management Fenner Nature Center System 9/9/2009 Miller Road Community Center Energy Boiler with Controls; Lighting Replacement with Control System; Energy Management Improvements System 9/9/2009 Boiler with Controls; Energy Management System with Transfer System; Lighting Fire Station #2 Replacement with Control System 9/9/2009 Boiler with Controls; Energy Management System with Transfer System; Lighting Fire Station #10 Replacement with Control System 9/9/2009 Service Garage Energy Improvements Mechanical Unit Replacement with Controls; Insulate Ceiling Area 9/9/2009 Boiler with Controls; Energy Management System; Lighting Replacement with Control Gier Community Center Energy Improvements System 9/9/2009 Foster Community Center Energy Boiler with Controls; Energy Management System; Lighting Replacement with Control Improvements System 9/9/2009 Letts Community Center Energy Boiler with Controls; Energy Management System; Lighting Replacement with Control Improvements System 9/9/2009

Lansing, City of

City of Lansing

Lansing, City of

IPACE

City of Lansing

Lansing, City of

Roadway traffic sensors

02262009

Start Date

Expected Completion Date

Improvements to 3 intersections in area bounded by I-96 ramps/Penn/American/Cedar/Edgewood Installation of roadway sensors to allow for the implementation of adaptive traffic signal timing plans

Submitted Requests - Not Approved

8/9/2009

11/9/2009

$

6/9/2009

6/9/2009

$

MLK Jr Blvd & 150,000 Willow 1,870,000

650,000

124 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Lansing

Lansing, City of

Project Name

Project Description

Grand/Kalamazoo Parking Structure

Start Date

Expected Completion Date

Construct new parking structure and BoarsHead theater near State Police HQ

8/9/2009

11/9/2009

O R

City of Lansing

Lansing, City of

STP

Major Street Rehabilitation

P P A

Milling and resurfacing, including installation of ADA sidewalk ramps, stripping, manhole adjustments, and minor greenbelt restoration. Mt. Hope-including watermain $2,000,000. To improve ridability, safety and extend the life of the City's street system. 6/9/2009

T O

Funding Request $

Route (Infrastructure Only)

12,000,000

D VE

Washington: MillerJolly; Edgewood: Washington-Cedar; Edgewood: MLKWashington; Holmes: Pleasant Grove-Berwick; Jolly: PennsylvaniaAurelius; Michigan: US127-East City Limits; Mt. Hope: Bedford-Moores 6,750,000 River

11/9/2009

$

5/31/2009 9/9/2009 9/9/2009 9/9/2009

$ $ $ $

35,000 10,000 10,000 10,000

N s

A non-profit community theatre, Community Circle Players (dba Riverwalk Theatre) provides quality entertainment to mid-Michigan theatre goers. The theatre is completing its 2nd major expansion that will provide a smaller theatre for use by Riverwalk, but also available to other arts groups for a variety of events. This grant would fund acoustical treatments and equip this new theatre space in downtown Lansing. Funding of $35,000 ($32,00 grant request) will provide a venue that will be a community resource with excellent acoustics, and modern light and sound systems. Currently the theatre does 10 productions/year and ticket sales over 14,000. The building is in use over 300 days per year and attracts performers, technical crews and patrons to downtown Lansing on a daily nightly basis. This grant will also help maintain the one fulltime theatre manager position and 1/2 time maintenance position at the theatre by providing additional revinue to meet operating expenses. This project could be funded throughTITLE VIII - National Endowment for the Arts or TITLE XII - Community Development Block Grants. 3/1/2009 Lighting Control System 6/9/2009 Lighting Control System 6/9/2009 Lighting Control System 6/9/2009

t s e

City of Lansing City of Lansing City of Lansing City of Lansing

Lansing Lansing, City of Lansing, City of Lansing, City of

City of Lansing

Lansing, City of

Grant for Riverwalk Theatre Renovation and Technical Equipment Fire Station #4 Fire Station #6 Fire Station #8 Operations and Maintenance Facility Energy Improvements

City of Lansing

Lansing, City of

Fire Station #5

City of Lansing

Lansing, City of

City of Lansing City of Lansing

Lansing, City of Lansing, City of

City of Lansing

Lansing, City of

R d

e t t

6/9/2009

9/9/2009

$

75,000

6/9/2009

9/9/2009

$

175,000

Fire Station #9 South Washington Office Complex Energy Improvements Virtualized Servers

Lighting Control System Lighting Replacement with Control System; Energy Management System with Transfer System Lighting Replacement with Control System; Energy Management System with Transfer System Mechanical System Replacement; Light Fixture Replacements; Roofing/Insulation System Replacements Replace existing servers with more energy efficient servers.

9/9/2009

9/9/2009

$

175,000

7/9/2009 6/9/2009

9/10/2009 9/9/2009

$ $

1,325,000 150,000

HVAC Improvements

Replace existing 25 year old system, with a more energy efficient HVAC system.

6/9/2009

9/9/2009

$

250,000

9/9/2009

$

700,000

4/10/2009

$

600,000

it

m b u

S

u q e

City of Lansing

Lansing, City of

Frances Park Shoreline Improvements

Construction of a new pathway to connect to an existing pathway on the shore of the Grand River. New fishing platforms (2) and boat docking facilities (2) will be constructed. Pathway will provide a safe route for joggers who currently run along with car traffic. 3/9/2009

City of Lansing

Lansing, City of

Baker Donora Focus Center

4000 sq. ft. structure with a multipurpose room, four offices, reception area, computer lab, restrooms, storage, fully equipped commercial kitchen and furnishings. 7/9/2009

02262009

Submitted Requests - Not Approved

125 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Lansing City of Lansing

Lansing, City of Lansing, City of

Neighborhood Empowerment Center Video Training System

17,000 sq. ft. of renovated office and program space on the former campus of the Michigan School for the Blind. The Greater Lansing Housing Coalition and other nonprofits will provide neighborhood, housing-related and human services to the community. 7/9/2009 The system would be used to train police and fire personnel 6/9/2009

City of Lansing

Lansing, City of

Public Wireless Internet Access System

Wireless internet access points to be placed in public buildings for public use.

Gier Community Center Gym Expansion

Creation of seating space for spectators, replacement of gymnaisum floor, expansion will create more community meeting space, replacement of outdated lighting system to a more efficient "green" lighting. 4/9/2009

Green Program/Single Stream Recycling

Purchase equipment to convert recycling operation to single steam. 7-Recycle Trucks; 44,000 residential 65 gallon curb carts; 10 - 5 cubic yard containers; 1,000 commercial 95 gallon curb carts. Customer education program. To streamline and make the City's recycling efforts more productive and efficient.

City of Lansing

City of Lansing

Lansing, City of

Lansing, City of

T O

6/9/2009

Lansing, City of Lansing, City of

Streetscape Miscellaneous Sewer Lining

City of Lansing

Lansing, City of

Cleaning/Grubbing Open Storm Drains

New sidewalk, decorative brickwork, streetscape furnishings, road reconstruction. Enhance the approach to the State Capitol. 6/9/2009 CIPP line apx. 300 lineal feet of sewer pipe 6/9/2009 Restoring the functionality of open storm drains by clearing, realigning, grubbing and bank stabilization. 6/9/2009

Letts Community Center Gym Expansion

Creation of seating space for spectators, replacement of gymnaisum floor, expansion will create more community meeting space, replacement of outdated lighting system to a more efficient "green" lighting. 4/9/2009

Lansing, City of

d e tt

st

e u

q e R

N s

4/10/2009 9/9/2009 9/9/2009

O R

P P A 6/9/2009

City of Lansing City of Lansing

City of Lansing

Expected Completion Date

9/9/2009

11/9/2009

Funding Request

$ $

1,100,000 250,000

$

250,000

$

900,000

D VE $

3,400,000 Citywide

11/9/2009 11/9/2009

$ $

Grand: KalamazooShiawasee; Washington: Allegan3,000,000 Washtenaw 50,000

11/9/2009

$

750,000 Citywide

9/9/2009

$

900,000

$

Saginaw; Grace: Ionia-Michigan; Maplehill: HomewoodGlenwood; Elm: River-Cedar; Cooley Garden Stormwater Outlet; Scott Woods Retension Basin Outlet; Pennsylvania: north of Miller Rd.eastside; Wood: DavidHampton; Donald: Cox-Potter; Sommerset: south 900,000 of Mi

t i m

City of Lansing

City of Lansing

b u S

Lansing, City of

Lansing, City of

02262009

Miscellaneous Sewer Repair

Bridge Rehabilitation

Repair, replace, line, rehab manholes, bank stabilization, install headwall. To extend the life of existing City sanitary sewers and provide uninterrupted sewer service to its customers. 6/9/2009

Aurelius-Red Cedar: Deck Replacement; Aurelius-Pawlowski Creek: Install box culvert and repair road.

Submitted Requests - Not Approved

6/9/2009

Route (Infrastructure Only)

11/9/2009

11/9/2009

$

Aurelius Rd: Red Cedar River; Aurelius Rd: 1,500,000 Pawlowski Creek

126 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Lansing

Lansing, City of

Project Name

Start Date

ADA Sidewalk Ramp Upgrade Program

Project Description Install ADA sidewalk ramps in the City's on going efforts to improve access to all its citizens.

6/9/2009

11/9/2009

10/9/2009

11/9/2009

City of Lansing

Lansing, City of

Southside Community Center

Provide community recreation/community services to the southside of Lansing by adding onto an existing underutilized school. Amenities include use of swimming pool auditorium, classrooms, gymnaisum and kitchen area. A new entrance, lobby and office area will be built. 3/9/2009

City of Lansing

Lansing, City of

Smith-Evans Drain Improvement

Enclose existing open storm drain for axp one mile to improve drainage, eliminate potential safety issue, and protect existing utilities (electrical and sewer)

New Sidewalk

Install sidewalk along major streets to improve safety and eliminate gaps in the City's sidewalk system. Encourage green modes of transportation within the City. 6/9/2009

City of Lansing

Lansing, City of

Expected Completion Date

City of Lansing

Lansing, City of

CSO Downtown 2009 - Allegan St./Chestnut St.

City of Lansing

Lansing, City of

Local Street Rehabilitation

T O

O R

P P A

CSO Control/sewer separation project that includes construction of new sanitary sewer, new water main, some new storm sewer, some new steam-utility mains, storm sewer rehabilitation, road reconstruction, and street enhancement Resurfacing, curb repair, ADA ramps and sidewalk

s t s

6/9/2009

-N

11/9/2009

Funding Request $

11/9/2009

D VE

2,200,000

$

Waverly Rd. at 2,500,000 Holmes Rd.

$

Construct 12 miles of new sidewalk 3,000,000 citywide

$

Allegan St. from Capital Ave. to Grand Ave., Chestnut St. from Ottawa St. to 4,000,000 Shiawassee St. 12 Miles of Local 6,000,000 Streets

$

Mt. Hope Ave. from Herbert St. to Bradley Ave.; S. Washington Ave. from Mt. Hope Ave. to Holmes Rd.; Barnes Ave. from Bradley Ave. to Todd Ave.; Smith Ave. from Bradley 10,250,000 Ave. to Todd Ave.

$

Many streets are impacted; the project is bounded by Willow St. on the north, Walnut St. on the east, Saginaw St. on the south, Westmoreland 20,500,000 Ave. on the west

e u

City of Lansing

Lansing, City of

CSO Sub-area 034B

itt

City of Lansing

S

Lansing, City of

02262009

m b u

d e t

CSO Sub-area 015 North

q e R

CSO Control/sewer separation project that includes construction of new sanitary sewer, new water main, some new storm sewer, storm sewer rehabilitation, and road reconstruction

CSO Control/sewer separation project that includes construction of new sanitary sewer, new water main, some new storm sewer, storm sewer rehabilitation, and road reconstruction

Submitted Requests - Not Approved

2,000,000 Citywide

$

$ 6/9/2009

Route (Infrastructure Only)

127 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Lapeer

City of Lapeer

City of Lapeer

City of Lapeer

City of Lapeer

City of Lapeer

City of Lapeer

City of Leslie

City of Lapeer

Project Name

Project Description

Start Date

To improve sustainability of the facility for the Lapeer Community through energy efficiency and conservation. The Lapeer Center Building was constructed in the 1950's with an addition in the mid 1960's; it has been adequately maintained but is still using many of the original fixtures. Our consultant has volunteered their services to do an energy consumption measurement on the facility and to develop and engineer an energy conservation and savings plan. Our Lapeer Center Building Inc. is a broad based non-profit community organization that operates the building while the land is owned by the City of Lapeer. Every week the Center Building hosts community wide activities like HDC emergency food assistance program, Lions Bingo, Masons weekly meeting, Historical Society meetings and it is a daily community senior meal site. Other regular activities are Michigan Works Job Fairs, Big Brother Big Sister events Immediate Center Building Energy Conservation Project and 4 -H events.

Saginaw Water Line

Saginaw Sanitary Sewer

Required sanitary sewer improvements must be constructed with Saginaw Street improvements funded by MDOT. The sewer main needs replaced due to age, this wil prevent future damage to the new roadway and sanitary sewer back-ups for property owners and businesses in the area. It is a MDEQ unfunded requirement. 6/1/2009

City of Lapeer

Genesee Sanitary Sewer

A sanitary sewer improvement that needs installed when the Genesee Street (old M21) gets reconstructed. Genesee Street improvements should be funded partially be MDOT. This section of Sanitary Sewer has outlived its design life. This new project will move the sanitary line into the greenbelt to preserve the life of the new road and allow much easier access for the sanitary sewer maintenance and repair. It is a MDEQ unfunded requirement. 6/1/2009

City of Lapeer

This is a 15 inch sanitary sewer line that needs replaced and relocated. The City proposes to build a new street to connect three major streets that are county collector roads. In the immediate area of the new street is an old 15 inch sanitary sewer line that is very dilapidated. This line passes through a wetland, therefore, replacement of the sanitary line that has outlived its design life that allows significant infiltration of the surface water into the sanitary system is a must. This upgrade is a MDEQ unfunded Village West Drive Sanitary Sewer Relocation requirement. 4/1/2009

City of Lapeer

City of Lapeer

City of Leslie

02262009

s t s

-N

e u

q e R

Funding Request

approximately 10 months

$

165,500

11/1/2010

$

1,084,166

11/1/2010

$

1,084,166

11/1/2010

$

1,599,600

10/30/2012

$

130,000

Sanitary Sewer upgrade

10/1/2012

$

32,000,000

Genesee Water Main

A water line that needs replaced when the Genesee Street (old M21) gets reconstructed. Genesee Street improvements should be partially funded with MDOT dollars through the Small Urban Task Force Region 5. This project consists of replacing 4 inch water line with 12 inch waterline due to the age and condition of the existing line. 6/1/2009

11/1/2010

$

1,599,600

Water Meter Installation

Currently the City of Leslie does not meter water and is on a flat billing system. It is essential to install water meters to reduce the consumption of water and the long-term costs of the City. Summer 09

Spring 2010

$

600,000

tt i m

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

Lapeer has concluded a detailed MDEQ planning grant that reviewed the status of the Lapeer Waste Water Treatment Plant. A draft project plan is in the hands of the MDEQ for review. this plan reviewed plant rehabilitation and design. The review concluded that the treatment plant has many sections that have outlived their design life and are in need of upgrade. Also, some additional capacity needs to be created at the facility. 4/1/2009

b u S

City of Lapeer

d e t

T O

O R

P P A

Must abandon old parallel 6 inch water line under Saginaw Street with reconnection of its existing water services onto existing 18 inch water main in Saginaw Street. These improvements will prevent future damage to new road. It is a MDEQ unfunded requirement. 6/1/2009

City of Lapeer

Expected Completion Date

128 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Leslie

City of Leslie

City of Leslie

City of Leslie

City of Litchfield

City of Litchfield

City of Litchfield

City of Litchfield

City of Litchfield

City of Leslie

City of Leslie

City of Leslie

City of Leslie

City of Litchfield

City of Litchfield

City of Litchfield

Project Name

Mill Street Bridge

North and South Main Street

The North and South sections of Main Street need to be completely reconstructed including curb, gutter, road, and new water and sewer mains. The water and sewer mains have had multiple breaks and the road is deteriorated to dangerous levels.

Waste Water Treatment Plant

Due to new permit limits imposed by EPA/MDEQ, the City of Leslie must install additional treatment capacity in its Wastewater treatment plant by 2011. This project needs to collect data for one year before the final design. The pilot testing should be complete in September of 09 and the design and engineering should be complete around that time as well. Fall 09

Water Treatment and Iron Removal Plant

The Water treatment plant which provides clean drinking water for the City has deteriorated extremely. The aerator, filters, detention area, and alert system are bad. In addition, the distribution pipe from the wells to the system could fail at anytime leaving the City with no bypass and no way to get water to its residents. The options have been researched and an entirely new plant would be the most cost effective way to go. Immediately

Sanitary SewerLift Station Replacement

The City of Litchfield is in the process of replacing aging sanitary sewer lift stations. The current lift statons are 30+ years old and are experiencing frequent failures. It is the goal of the Litchfield City Council to replace all six (6) lift stations. 7/1/2009

10/30/2009

Watermain Rplacement

The City of Litchfield is in the process of replacing aging watermain pipe. The current watermain are 50+ years old and are experiencing frequent failures. It is the goal of the Litchfield City Council to replace 30,000 linial feet . 7/1/2009

litchfield District Library Project

The City of Litchfield is working cooperatively with the Litchfield District Library in pursuing a new state of the art Library and Community Center. This project will provide informational media services for both the working and unemployed citizen of Litchfield. The building project is currently being designed and has a construction start up date of August 30, 2009. The tenative is estimated aat $900,000. 8/30/2009

10/30/2010

The City of Litchfield is in the process of replacing aging Sanitary Sewer pipe. The current watermain are 40+ years old and are experiencing frequent failures. It is the goal of the Litchfield City Council to replace 20,000 linial feet .

7/1/2011

7/1/2011

The City of Litchfield is in the process of replacing aging road infrastructure. The current road system is . It is the goal of the Litchfield City Council to replace 31,680 linial feet or six (6) miles roads and streets.

City of Litchfield

7/1/2011

7/1/2014

Existing runway and taxiway pavements have deteriorated and are in need of reconstruction. Airport provides a valuable transportation link and is a vital part of the community; however it is ineligible for federal funds. Runway will be lengthened from the existing 2,394' to 2,750’ and widened from the existing 50’ to 60' to meet minimum size standards. Existing navigational lighting aids along runway will be replaced with updated fixtures which will provide a safer more energy efficient system. A flight school and growing Fixed Base Operator are currently using this runway and plan to add additional buildings and jobs. The continuing deterioration of this pavement will soon begin to limit these businesses operations and force them to relocate to another area. Project will create temporary construction jobs and preserve jobs that are currently tied to the airport. 5/1/2009

8/1/2009

Sanitary Sewer Rplacement

t i m

Road Rehabilitation Project

S Lowell, MI

02262009

Runway Reconstruction

A T

s

t s e

u q e

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

D VE $

1,012,000 Truck route

$

Main thoroughfare 1,795,000 in town

Spring 2010

$

1,085,000

10/1/2009

$

1,259,775

O R

PP

O N

R d

e t t

City of Litchfield

Start Date

The Mill Street Bridge is located on Mill Street and turns into Fitchburg. It is a designated truck route and leads to the City of Leslie's Certified Business and Industrial Park. The Bridge is currently eroding and has had its weight limit dropped to 20 tons, limiting the amount of truck traffic to the Business park. The bridge is near failure.

ub

City of Lowell

Project Description

Expected Completion Date

10/30/2012

$

990,000 Rwy 12/30

129 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Ludington

City of Ludington

Mitchell St. Sewer Main Replacement

City of Ludington

City of Ludington

Resurface Downtown Parking Lots

Replace approximately 600 LF of sanitary sewer main on Mitchell Street. The existing sanitary sewer is flat, which results in periodic sewage backups into residents' homes. 6/1/2009 This project would resurface and restripe the City-owned downtown parking lots located adjacent to the Eagles club and the Post Office. 5/1/2009

City of Ludington

City of Ludington

Rath Ave. Lift Station Upgrades

This project would install a new sewage transfer pump at the Rath Ave. lift station in order to provide a bypass or back in the event of a failure of the City's largest lift station. This lift station handles 50% of the City's sewage flow. Without this transfer pump, sewage would back up into hundreds of properties in the event of a failure of this lift station. 5/1/2009

City of Ludington

City of Ludington

North Lewis Street Reconstruction

This project would entail reconstructing North Lewis Street, including new pavement, new curb & gutter, new water & sewer mains, and new sidewalk. 5/1/2009

T O

City of Ludington

Tamarac Village/Bryant Road Force Main Project

City of Ludington City of Ludington

City of Ludington City of Ludington

Resurface City Streets Gaylord Water Tower Repainting

City of Ludington

This project would entail constructing a new breakwater at the Loomis Street boat launch in order to prevent sedimentation from filling in the boat launch area. An ADAcompliant walkway would be placed on top of the breakwater to allow greater public access to the waterfront. This project will eliminate the need for annual dredging of Loomis Street Breakwater & Walkway Project the boat launch area. 5/1/2009

City of Ludington

City of Ludington

Municipal Marina Transient Dock Project

City of Ludington

City of Ludington

District Library Addition

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Ludington

d e tt

City of Ludington

Ice Rink

t i m

North Staffon Street Reconstruction

N s

st

e u

8/1/2009 6/1/2009

Funding Request

$

D VE

125,000

$

175,000

7/1/2009

$

175,000

7/1/2009

$

200,000

7/1/2009 7/1/2009

$ $

300,000 450,000

9/1/2009

$

500,000

8/1/2009

This project would entail constructing a new transient dock at the Municipal Marina to handle 30 boats. The project would include observation platforms and a 8' wide public walkway along the waterfront. It would reduce the current waiting list at our marina. 5/1/2009 This project would entail constructing an addition to the District Library to ease severe overcrowding conditions. 7/1/2009

8/1/2009

$

1,100,000

11/1/2009

$

1,300,000

This project would entail constructing a new outdoor public ice rink in downtown Ludington. The project would include a pavilion covering over the rink to protect it from the elements along with a cooling system. The project would encourage more people to visit downtown and shop at the local retailers.

8/1/2009

11/1/2009

$

500,000

North Staffon Street between Ludington Avenue and Tinkham Avenue would be reconstructed with new pavement, new curb & gutter, new sidewalk and new water and sewer utilities.

q e R

7/1/2009

10/1/2009

$

750,000

New Fire Station

This project would entail purchasing property upon which the City already has an option and constructing a new fire station, so that the site of the existing fire station can be used to construct a new office building, which will result in approximately 100 jobs moving into downtown Ludington. 6/1/2009

11/1/2009

$

1,500,000

City of Ludington

North Concession Stand Replacement

This project would tear down and replace the existing north concession stand and restrooms at Stearns Beach, which is the City's most popular beach. The existing concession stand is in poor condition and none of the bathrooms are ADA-compliant. 8/1/2009

11/1/2009

$

200,000

City of Ludington

Wastewater Treatment Plant Outfall Pipe Relocation

This project would extend and relocate the Wastewater Treatment Plant's outfall discharge pipe in order to bring the City into compliance with expected changes to our National Pollutant Discharge Elimination System (NPDES) permit. 8/1/2009

11/1/2009

$

800,000

ub

City of Ludington

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

120,000

$

O R

P P A

Relocate three force mains and install approximately 700 LF of sanitary sewer main on Bryant Road. The three force mains carry sewage from locations outside of the City. The condition of the force mains and sanitary sewers has resulted in numerous complaints of sewage odors. This project will eliminate these odors and relcoate a 40 year-old force main, which runs through the City's cemetery. 4/1/2009 This project would entail resurfacing various City-owned streets that have fallen in various states of disrepair. 5/1/2009 This project would entail repainting the Gaylord Avenue water tower 6/1/2009

City of Ludington

City of Ludington

Expected Completion Date

130 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Luna Pier City of Luna Pier

Luna Pier, MI Luna Pier, MI

Water Treatment Plant Upgrades

This project would entail constructing new filters at the Water Treatment Plant in order to increase the quantity and quality of water treatment. Currently, if one of the two existing filters goes out of service, the City would be unable to meet its peak summertime demand for water. 11/1/2009

$

5,500,000

P P A

12/1/2009

$

5,700,000

7/5/2009 8/1/2009

5/28/2011 6/30/2010

$ $

2,500,000 3,500,000

7/1/2009

7/1/2011

$

5,500,000

9/9/2009

6/10/2009

$

East End River 1,200,000 Street

7/9/2009

10/9/2009

$

600,000

7/9/2009

10/9/2009

$

600,000 US 31 to Princeton

5/9/2009

8/9/2009

$

6/9/2009

8/9/2009

$

475,000 Firse Street Beach Maple Street to 200,000 Tamarack

$5,000,000 Historic and Cultural Landmark. Over $3,000,000 of rehabilitation over the past 20 years funded through Grants from the Michigan Council for the Arts, Citizens Donations, Memorials and Endowments. Roof and HVAC replacement and upgrades to this 1903 Opera House will result in protecting the asset and energy efficient operation.. 5/9/2009

10/30/2009

$

500,000

T O

6th Ave /Century Terrace

Reconstruction of a major Route serving two High Schools

City of Manistee

City of Manistee

12th Street Reconstruction

City of Manistee

City of Manistee

Douglas Park BathHouse

City of Manistee

City of Manistee

12th Street Upgrades

d e t

D VE

1,800,000

This project would entail constructing a new water transmission main between the cities of Ludington and Scottville to handle the increase in commercial growth in and between the two cities. Renovate and restructure the dyke system for sustained flood protection and economic development. Upgrade water treatment plant for compliance and growth Upgrades and enhancements to the City of Mackinac Island's wastewater treament plan.

s t s

-N

Replaces deteriorated Bathhouse on Major West-Michigan Beach. Eliminates two failing septic systems on beach and replaces with lift-station and Sanitary Sewer Upgrade a minor street adjacent to Regional HighSchool to Major Street status to handle traffic overburden.

e u

q e R

8/1/2009

12/1/2009

Funding Request

O R 5/1/2010

City of Manistee

City of Manistee

Ramsdell Theatre Roof and HVAC

City of Manistee

City of Manistee

Ramsdell Theatre Interior Rehabilatation

Renovation of several interior areas including rehearsal space, Theatre subfloor waterproofing, rentable office space, stage and substage and utility areas.

4/9/2009

12/9/2009

$

400,000

Street Upgrades

State of Michigan endorsed Asset Management Plan. Pavement recycling and rejuvenation. Taking advantage of “Windows of Opportunity” before the pavement reaches its critical distress point.

City of Manistee

City of Manistee

City of Manistee

City of Manistee

City of Manistee

S

City of Manistee

02262009

5/9/2009

7/9/2009

$

800,000 Various

River Bank Sewer

Replacing and protecting 60 year old Interceptor Sanitary Sewer Line along rivers edge serving a State Prison and Community Hospital. Failure would environmentally threaten the Manistee River. 7/9/2009

9/9/2009

$

West of Maple 650,000 Street Bridge

Maple Street Bridge

Replaces and repairs 50 year old electrical components on City owned and operated Bascule Bridge. Operation of bridge is critical to allow passage of freighter traffic directly supporting over 600 “Held of Household” jobs. Approaching 1,000,000 tons of freight annually. 9/9/2009

6/10/2009

$

Maple Street and 800,000 River Street

Arthur Street Boat Launch

Reconstruction of primary boating access site to the waters of Lake Michigan, Manistee River, and the Little Manistee River. Universal accessibility for fishing and boating. The Manistee River is a Federally designated Wild and Scenic River and the Little Manistee Blue Ribbon Trout Stream. 6/9/2009

8/9/2009

$

400,000 29 Arthur Street

ub

City of Manistee

City of Manistee

tt i m

Route (Infrastructure Only)

$

Eliminates Combined Sewers, Upgrades Infrastructure to allow Brownfield Redevelopment to a “Cool Cities” neighborhood. Separation required by MDEQ no later than 2011. Street and Utility Reconstruction and Drainage improvements to serve HUD senior housing complex

Jones Street Sewer Separation

City of Manistee

Start Date

South Washington Avenue Bridge Replacement

Waste Water Treatment Plant Upgrade Mackinac Island Wastewater Plant Improvements

City of Manistee

Project Description

This project would entail replacing the 41-year-old S. Washington Ave. bridge that is in poor condition. It would include raising the bridge approximately 2 feet to allow boaters greater access to local marinas, replacing about 200 feet of approach on each side of the bridge along with any necessary utilities, and include a 10' wide public walkway to link existing walkways by the waterfront. 8/1/2009

Water Transmission Main Extension

City of Mackinac Island Mackinac Island

City of Manistee

Project Name

Expected Completion Date

Submitted Requests - Not Approved

131 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Manistee

City of Manistee

Marina Building

City of Manistee

City of Manistee

6th Ave. Pump Station

Completes Phase II of Reconstruction of Municipal Marina Service Building. Upgrades structurally failing building and adds amenities to attract and serve boaters from around Lake Michigan. 4/9/2009 Completes replacement of undersized pump station serving Prison, Hospital and North Side of the City. Upgrades required by MDEQ. 4/9/2009

City of Manistee

City of Manistee

Truck Route rehabilitation

Final ten blocks of rehabilitation on Truck Route Serving regional Heavy Industrial District.

4/9/2009

City of Manistee

City of Manistee, Filer Township, Manistee Township

Fiber Optics

Connects all major City facilities with fiber optics to facilitate data exchange, water system monitoring

6/9/2009

US 31 Sanitary Force Main Safe Routes to School Sidewalk improvements

Replace 30+ year old force main which suffers frequent breaks. 5/9/2009 Walkability audit by Schools under Safe-Routes-2-Schools program identified lacking and inadequate sidewalk. 4/9/2009

Bridge-to-Bay Trail Loop

Bridge-to-Bay Trail: This project would provide a trail loop to and through Marine City's Downtown area. Currently the Bay Trail runs along the Western boarder of the city. The trail loop would allow safe crossing of the Belle River with a trail bridge and provide a marked path to and through the riverside downtown area. 7/1/2009

City of Manistee City of Manistee

City of Marine City

City of Marine City

City of Marine City

City of Marine City

City of Marine City

City of Marine City

City of Marine City

City of Marine City

City of Marine City

6/9/2009

7/9/2009

O R

350,000

D VE $

130,000

$

From 10th Street to 350,000 South City Limits

$

7/9/2009

$

600,000

11/1/2009

$

643,000

Renovation of Historic City Hall (300 Broadway)

This project would restore the interior, exterior and the grounds of the historic city hall facility. The building was listed on the State of Michigan Historic register on August 6, 1976, and entered on the National Register of Historic Places on January 11, 1982. In 2008, Historic 300 Broadway and its surrounding grounds and park became the cornerstone of Marine City’s Historic District with the State of Michigan. Currently on the preservation list of SHPO 7/1/2009

12/15/2010

$

2,510,000

Historic Light House Restoration & Sea-wall Repair

This project would restore the 1908 Peche Island Lighthouse located in Marine City to a level allowing limited public access. In addition it would provide sea wall repairs in the park located around the lighthouse on the St Clair River reducing shore line erosion. 5/15/2009

6/30/2009

$

95,000

Waste Water Plant & Pumping Station Generator

This project would fulfill a DEQ requirement for waste water plant operators to provide emergency back-up power for waste water plants and remote pumping stations. The scope of this project would provide a back-up generator at the Marine City Waste Water Plant and a critical remote pumping station. 4/15/2009

6/15/2009

$

293,000

North Belle River Avenue – Degurse to West Blvd: Total reconstruct. Add curb and gutter, storm. Replace sanitary and water. Main Street – Broadway to Bridge Street: Total reconstruct. Replace sanitary, storm, water S. Belle River Avenue & Alger Street – Parker to Brown Street: Total reconstruct. Add curb and gutter. Replace water and storm sewer. Sanitary is ok. West Blvd – Parker Street to South Belle River Avenue: Total reconstruct. Replace water main. Investigate sanitary and storm for possible replacement. 6/1/2009

9/15/2009

$

2,725,000

12/1/2009

$

6,504,000

12/31/2009

$

1,324,000

tt i m

d e t

N. Belle River / Main Street / West Blvd Rebuild

S City of Marine City

Marine City King Road Extension

City of Marine City

City of Marine City

South Main Street Bridge Rebuild

T O

N s

st

e u

q e R

P P A

King Road Extension: Total construction - curb and gutter, sidewalks, storm, sanitary and water. This project opens up the south end of Marine City for development of a St Clair County Industrial Park by providing access to almost 400 acres of property with access to city water and sewer and other private utilities. Project would also provide a save-way to local elementary, middle, and high school students. 6/1/2009 Reconditioning of bridge understructure and complete replacement of road surface. This is an MDOT requirement by 2012 5/1/2009

Submitted Requests - Not Approved

9/9/2009

$

7/9/2009

City of Marine City

02262009

7/9/2009

Funding Request

Route (Infrastructure Only)

150,000 Various Lakeshore Road to 250,000 Hahn Road

ub

City of Marine City

Expected Completion Date

$

132 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Marine City City of Marquette

City of Marine City City of Marquette

Degurse / Ward Street Rebuild Street Structure Reconstructs

Degurse – King Road to Belle River Ave: Existing concrete pavement needs sealing, mud jacking of settled panels, diamond grinding, replacement of cracked panels and curb, minor storm sewer work on east end (needs to be televised) Ward Street – King to Parker: Existing concrete pavement needs sealing, mud jacking of settled panels, diamond grinding, replacement of cracked panels and curb, minor storm sewer work on east end (needs to be televised) 6/1/2009 Total Street Reconstruction and Minor Utility Repairs (Various Locations 6/8/2009

City of Marquette

City of Marquette

Pave Gravel Streets

Gravel Street Structure Upgrade with HMA, and Curbing. Minor Utility Replacements. 6/8/2009

T O

City of Marquette City of Marquette

City of Marquette City of Marquette

City of Marquette

City of Marquette

Ciff Dow Site Clean Up Clean up of Brownfield site that is presently owned by the City of Marquette. SIMP Various Street Resurfacing Water Main/Sewer Main LS & I Lakeshore to Fair Distribution Sanitary Sewer Main and Water Main Replacement

City of Marquette

City of Marquette

Seventh Street Extension

City of Marquette City of Marquette City of Marquette

City of Marquette City of Marquette City of Marquette

City of Marquette

9/15/2009 9/12/2009

P P A

O R 10/10/2009

Funding Request

Route (Infrastructure Only)

D VE $ $

260,000 1,160,000 Various Streets

$

Wilkinson, White, 1,828,000 and Harlow Streets North of Wright Street,South of UnionStreet and between the abandonded RR. ROW and 2,000,000 Lakeshore Blvd. 1,800,000 Various Streets Lakeshore Blvd. to 709,000 Fair Ave.

6/8/2009 6/8/2009

8/8/2009 9/12/2009

$ $

4/30/2009

6/6/2009

$

New Collector Street and Utility Construction for an Important North-South Corridor Link

5/11/2009

7/11/2009

$

W. Michigan Street Sidewalk Repair San. Sewer Lateral Replacements

Total Street and Utility Reconstruction Project Sidewalk Replacement and ADA Ramp Construction (Various Locations Failing Orangeburg Lateral Replacements (Various Locations

5/11/2009 5/11/2009 5/11/2009

9/12/2009 7/11/2009 7/11/2009

$ $ $

City of Marquette

San. Sewer Slip Lining

Sanitary Sewer Main Replacement (Trenchless Method) (Various Locations)

5/11/2009

7/11/2009

$

City of Marquette

City of Marquette

Champion Street

Total Street and Utility Reconstruction Project

5/11/2009

9/19/2009

$

1,000,000 Various Streets Genesee Street to 2,000,000 Fisher Street

City of Marquette

City of Marquette

Wright Street Water Main Upgrade & Street Resurfacing

5/11/2009

8/8/2009

$

Industrial Parkway 2,509,000 to Ontario Ave.

Recently, two dams along Rice Creek were taken out of commission and flow rates altered to resemble the original natural flow, which makes the existing culvert undersized. The culvert replacement is the last phase of the Rice Creek Stream Restoration Project. The goal of the project is to re-establish Rice Creek as a natural trout stream as it existed prior to the dams being installed. The current culvert width is 12 feet wide, but needs to be doubled to 24 feet wide to allow for adequate flow. If this crossing is not increased, a catastrophic failure may occur. Phase One of the projects was funded in part by three grants (DNR, Great Lakes Basins, and US Fisheries and Wildlife) and constructed by four governmental agencies (City of Marshall, Calhoun County Road Commission, Calhoun County Conservation District, and the DNR) and completion is scheduled for the fall of 2009. The culvert also allows citizen access to North Ketchum Park, including open green space, playground, picnic pavilion, grills, and skateboarding area. 5/15/2009

9/1/2009

$

City of Marshall

b u S

City of Marshall

02262009

Rice Creek Culvert

e u

eq

R d

e t t

t i m

s t s

-N

Major Arterial Street Structure Replacement and Water Main Upgrade. Designated Truck Route

Submitted Requests - Not Approved

Spring Street to 851,000 Washington Street Oak Street to Front 1,561,000 Street 100,000 Various Streets 800,000 Various Streets

150,000 NA

133 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Marshall

City of Marshall

Project Name

Project Description

Start Date

Compost Spreader

The City currently operates a compost center which takes in leaves, grass, brush and other organic materials. Those materials are then ground, mixed and turned to produce mulch. This product remains onsite until picked up by interested persons for use as a “natural” additive for their gardens and/or farms. The purchase of a compost mulch spreader will allow the City of Marshall to more efficiently distribute organic material to local farmers by means of delivering this material to farm sites. The use of natural compost will help reduce reliance on petrochemical-based fertilizers. This piece of equipment will also allow the City to comply with MDEQ/MDNR regulations, as the State of Michigan mandates that compost material can only remain onsite for 3 years. Due to reliance on a limited, voluntary customer base, and the logistics of moving and distributing the material, the City of Marshall has been unable to dispose of enough material to comply with this regulation. The mulch spreader would be shared among multiple governmental jurisdictions having the same problem. 5/15/2009

Street Lamp Replacement

In an effort to reduce the amount of electricity needed to operate the street lights in the City of Marshall, the city is proposing to replace all mercury vapor street lights to more efficient high pressure sodium lights. Along with reducing the overall amount of electricity that will be used, the street light replacement program will reduce the required maintenance for bulb replacement due to the expected additional life of the high pressure sodium bulbs. The program also addresses both light pollution and environmental pollution as high pressure sodium lights cast a different type of light tha creates less light pollution. The mercury bulbs will be recycled and disposed of properly to reduce environmental pollution. The City of Marshall replaces all new fixtures with high pressure sodium bulbs when needed, but the city has over 850 mercury vapor fixtures which need to be converted. The light replacements would have a dramatic effect in reducing energy use. 5/15/2009

City of Marshall

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

10/15/2009

$

167,000 NA

10/15/2009

$

185,000 NA

The Cronin Project involves the rehabilitation and adaptive reuse of a significant historic building in downtown Marshall, resulting in creation of approximately twenty new permanent jobs and preservation of an historic asset. Marshall is the county seat of Calhoun County. This rural community has been hard hit by recent corporate moves and plant closings, resulting in workforce reductions. The aggregate total for the past four years is more than 2,000 jobs lost from this small city of 7,459. On a macro level, Marshall’s competitive standing faces an even greater threat. A recent study of Calhoun County’s economic growth published by Upjohn Institute for Employment Research (Erickcek, 8/2/02), states the county’s residential, retail and service industry growth has fallen far below national averages. Marshall is working to reverse these trends. In 2003, the City was designated a Michigan Main Street community. In 2007, the DDA partnered with the City, investing $100,000 of leverage funds for a Signature Building Initiative Grant from Michigan State Housing Development Authority to purchase the Cronin Building. Plans include installation of a2/15/2009

12/31/2009

$

The Marshall House is a HUD, rent-supported, 100 unit senior citizen apartment complex managed by the City. It serves the independent living needs for economically disadvantaged senior citizens. The building is 30 years old and some of its systems have significantly deteriorated. The roof is need of full replacement, and resultant moisture problems have caused the failure of several windows and other problems with the supporting structures. The Marshall House Project will prevent further deterioration of the building, reduce ongoing maintenance problems, increase resident health and safety, and improve energy efficiency by insulating and resealing the roof and window structures. 5/15/2009

10/15/2009

$

A T

City of Marshall

Expected Completion Date

s

t s e

O N

u q e

R d

City of Marshall

City of Marshall

e t tt

i m

Cronin Project

ub

S City of Marshall

City of Marshall

02262009

Marshall House Repairs

Submitted Requests - Not Approved

1,200,000

300,000 NA

134 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Marshall

City of Marshall

Project Name

Project Description

Start Date

City of Marshall

Funding Request

Route (Infrastructure Only)

$

Eagle Street, Jefferson Street, Madison Street, Arms Street, Green Street, Monroe Street, Page Street, Mansion Street, Grand Street, Division Street, Forest Street, Kalamazoo Street, Sibley, Gorham Street and 1,380,000 Liberty

10/15/2009

$

Montgomery Street, Warren Street, Fair Street, Washington Street, Clinton Street, River Road, River Street, Maple Street, Elm Street, 4,775,000 Chestnut Street

The Monroe Street Bridge over Rice Creek is 117 years old and services over 2,300 vehicles per day. This bridge has been posted for reduced loading due to it’s structurally deficit condition. The City of Marshall has attempted to secure funding for the replacement for this bridge for the past 3 years through the Michigan Department of Transportation Local Bridge Program without any success. The bridge was originally constructed in 1891 and is one of two crossings over Rice Creek within the City. Due to safety concerns, the City of Marshall recently increased the frequency of inspection on this bridge and started design engineering for a structurally sound replacement. 6/15/2009

10/23/2009

$

600,000 Monroe Street

The South Marshall Bridge over the Kalamazoo River is nearly 100 years old and services over 3,000 vehicles per day. This bridge has been posted for reduced loading due to it’s structurally deficit condition. The City of Marshall has attempted to secure funding for the replacement for this bridge for the past 3 years through the Michigan Department of Transportation Local Bridge Program but has been unsuccessful. The bridge was originally constructed in 1910 and is one of two crossings over the Kalamazoo River within the City. Due to safety concerns, the City of Marshall recently increased the frequency of inspection on this bridge and started design engineering for a structurally sound replacement. 6/15/2009

10/23/2009

$

South Marshall 1,300,000 Avenue

Street Rehabilitation

The number of streets in the City of Marshall rated "poor" has more than doubled in the past two years. This is largely due to limited capital funding along with increased operational expenses from fuel and materials costs, as well as severe winter weather. The Street Reconstruction Project includes over 10 miles of street reconstruction within the City of Marshall in various locations. The project allows the City to advance its Street Reconstruction Program to increase the average “Remaining Service Life” of the street system to 6 years from today’s average 3 years RSL. Asset management software has been used to calculate the amount of investment needed to increase pavement service life to an acceptable level. The analysis recommended that $250,000 worth of work occur each year for the next 15 years, to prevent several streets from completely failing. 5/15/2009

Fairgrounds Infrastructure Improvements

The residential area surrounding the Calhoun County Fairgrounds in the City of Marshall is considered economically depressed and is currently serviced with private wells and septic systems which continue to fail. In 2001, the City of Marshall paid for the design of sanitary sewer, water main, storm sewer and street improvements. Shortly after the design was completed, the Michigan Supreme Court “Bolt” ruling prohibited the use of system funds for the extension of utilities. The residents of this area could not afford the special assessment cost and the project was never constructed. The project includes the extension of water distribution mains and sanitary sewer collection mains for approximately 70 parcels that are currently on privately owned systems. Also included in the improvement is approximately 2 miles of street reconstruction along with installation of curb and gutter and storm sewer. 5/15/2009

T O

City of Marshall

Expected Completion Date

P P A

O R

N s

t s e

10/15/2009

D VE

u q e

City of Marshall

City of Marshall

City of Marshall

02262009

e t t

Monroe Street Bridge Replacement

t i m

b u S

City of Marshall

R d

Marshall Avenue Bridge Replacement

Submitted Requests - Not Approved

135 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Marshall

City of Marshall

Project Name

Project Description

Start Date

The City of Marshall’s Fire Department building does not meet size recommendations as sited by the National Fire Prevention Association. Currently, the fire department occupies a portion of City Hall, a 152 year old building which is too small to allow for all the equipment to be available to the department in a moment’s notice. The department's ladder truck is stored offsite, which increases response time to structure fires. A new fire department building will remedy these problems and also free up space at City Hall for the Police Department (also in need of office and garage space) The fire department relocation will also improve the security for Police vehicles and other public safety equipment which is currently stored outside. The fire department building would also include the Local Ambulance Service operations. This would improve intra-agency operability and efficiency. The city mechanic also has the need for additional space in order to safely, efficiently and effectively maintains city equipment. The proposed fire station construction would include a mechanic’s garage in order to relieve spatial concerns and improve maintenance operations. Constructio 7/15/2009

Fire Department Building

A T

City of Marshall

s

t s e

City of Marshall / Marshall Township C-Drive Infrastructure Extension

City of Menominee

Replacement of Humidifiers at Spies Public Library

City of Monroe

CITY OF MONROE

CITY HALL PLAZA RECONSTRUCTION

City of Monroe

CITY OF MONROE

u q e

The existing humidifiers are old and in need of replacement. New humidifiers will do a much better job of adding just the amount of moisture to the indoor air, especially in the fall and winter months, and this is essential to maintaining the appropriate indoor environment to preserve the Library's book collections. Summer, 2009 RECONSTRUCTION OF EXTERIOR MAIN ENTRANCE TO MONROE CITY HALL AND MONROE COUNTY COURTHOUSE 5/1/2009

e t tt

ROESSLER STREET BRIDGE REHABILITATION

4/15/2009

Funding Request

REHABILITATION OF BRIDGE SUPERSTRUCTURE, INCLUDING ALL BEAM ENDS, AND OTHER RELATED WORK

8/1/2009

Route (Infrastructure Only)

D VE $

O N

WEST THIRD STREET RESURFACING AND REPLACEMENT OF ALL CURB AND GUTTER SECTIONS, MILLING AND CURB REPLACEMENT - UNION TO RESURFACING OF TOP 3" OF BITUMINOUS PAVEMENT, RELATED INCIDENTAL MONROE WORK 8/1/2009

ub

CITY OF MONROE

PP

R d

i m

O R

The Marshall area has experienced severe job losses over the past 5 years due to the local facility closings by Eaton Corporation (570 jobs), State Farm Insurance Company (569 jobs), Collins & Aikman (210 jobs), and Lear Corporation (810 jobs). In Marshall Township, just west of I-69, there are a number of large industrial-zoned parcels with interstate highway and railroad access that have attracted significant interest by growing industrial companies. The Gerholz site is approximately 750 acres. With adjoining properties, we are able to offer approximately 1,140 acres for industrial development on these parcels. In 2008, the properties were strongly considered by Volkswagen (estimated 2,500 jobs at full build out) and United Solar Ovonic (estimated 2,400 jobs at full build out on 200 acres) for large-scale industrial complexes. Both companies chose other sites largely due to the lack of water, sewer and electric utilities. The proposed project allows the City of Marshall to serve the site, effectively attracting new industry to the area. The preliminary design basis report has been prepared and a consulting engineer has been selected for the design 8/1/2009

City of Menominee

City of Monroe

Expected Completion Date

4,000,000 NA

Industrial Road, West Drive, W. Michigan Avenue, Myron Avery Drive, 23,220,000 C Drive North

5/1/2010

$

7/1/2010

$

8,500

8/1/2009

$

100,000

$

WEST THIRD STREET - UNION STREET TO SOUTH MONROE 800,000 STREET

$

ROESSLER STREET BRIDGE OVER RIVER 800,000 RAISIN

11/1/2009

12/1/2009

S 02262009

Submitted Requests - Not Approved

136 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Monroe

City of Monroe

City of Monroe

City of Monroe

City of Monroe

City of Monroe

FRENCHTOWN TOWNSHIP

CITY OF MONROE

CITY OF MONROE

Project Name

Project Description

Start Date

NEW CENTRAL FIRE STATION / PUBLIC SAFETY BUILDING

CONSTRUCTION OF NEW FACILITY TO REPLACE UNDER-SIZED AND OUTDATED CENTRAL FIRE STATION, WILL ACCOMMODATE CITY POLICE DEPARTMENT AS WELL

Turning Basin Industrial Site – Site 2

Situation: The Port of Monroe currently has no terminal warehouses to store breakbulk material being transloaded from ships to surface transportation. This project would provide an intermodal transportation warehouse to be built on the west shore of the River Raisin Turning Basin near the existing Port office building. The warehouse would provide additional port facilities to assist in the shipping and receiving of waterborne commerce. The project would include area paving and service utilities, as well as, shore protection along the River Raisin edge of the property and a dock and associated dredging along the Turning Basin edge of the property. 2/1/2010

T O

t s e

u q e

DETROIT AVENUE RECONSTRUCTION RECONSTRUCTION OF EXISTING PAVEMENT, REPLACEMENT WITH 9" MILL STREET TO NORTH DIXIE HIGHWAY CONCRETE PAVEMENT WITH INTEGRAL CURB

CITY OF MONROE

MACOMB STREET BRIDGE SUPERSTRUCTURE REPLACEMENT

R d

i m

REPLACEMENT OF BRIDGE DECK AND BEAMS, REHABILITATION OF ABUTMENTS AND BACKWALLS ON NORTH AND SOUTH ENDS

4/1/2010

4/1/2010

12/1/2010

$

11/1/2010

$

2/1/2012

8/1/2010

9/30/2010

$

$

MACOMB STREET BRIDGE OVER 2,000,000 RIVER RAISIN Port of Monroe property south of Front Street, east of I-75 and west of MACSTEEL 2,500,000 property.

$

30 days after start

$

City of Monroe

Village of Mancelona

police vehicle

Our current police car is 3 years old and it is the only reliable police vehicle owned by the village. It is shared by 2 officers and currently has over 90,000 miles on it. 2010

Submitted Requests - Not Approved

3/1/2009

6,000,000

DETROIT AVENUE - MILL STREET TO NORTH DIXIE 750,000 HIGHWAY

7/1/2011

WASTEWATER TREATEMENT PLANT IMPROVEMENTS

NORTH MONROE ST (NORTH MONROE #1), BURKE AVE (STONEYPOINTE #1), MAIN ST (STONEY POINTE #2), GRANDVIEW AVE (STONEYPOINTE #3), POINTE AUX PEAUX RD (STONEYPOINTE 680,000 #4)

$

$

CITY OF MONROE

Route (Infrastructure Only)

Port of Monroe River Raisin Turning Basin dock, west of Port Avenue and North 10,200,000 of Front Street

3/1/2010

City of Monroe

02262009

D VE

Port of Monroe Industrial Park

MODIFICATIONS TO PLANT ELECTRICAL DISTRIBUTION SYSTEM, WET WEATHER ENHANCEMENTS, IMPLEMENT PLANT-WIDE SCADA SYSTEM, ENHANCE PLANT SECURITY & LIGHTING SYSTEMS. PROJECT WILL ENHANCE SECURITY & RELIABILITY; ELIMINATE BLENDING PARTIALLY TREATED WASTEWTER DURING PRECIPITATION EVENTS; ENABLE MORE EFFICIENT MEANS TO MONITOR AND CONTROL PLANT PROCESSES.

S

Funding Request

Situation: The land is vacant and zoned industrial. This industrial area is located east of I-75 and south of Front Street. Approximately 40 acres are available for development. The project involves extending the existing roadway and existing service utilities. 6/1/2009

ub

CITY OF MONROE

4/1/2010

N s

CITY OF MONROE

O R

P P A

SANITARY SEWER PUMP STATION IMPROVEMENTS

UPGRADE 5 EXISTING PUMP STATIONS TO MEET CURRENT STANDARDS. EXISTING STATIONS ARE 30+ YEARS OLD AND ARE BEYOND THEIR SERVICE LIFE. PROJECT WILL UPGRADE PUMP STATION TO CURRENT STANDARDS, REDUCE EMERGENCY REPAIRS AND SYSTEM BACKUPS. 6/1/2009

e t tt

Expected Completion Date

2205 EAST 12,700,000 FRONT STREET

40,000

137 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Monroe

CITY OF MONROE

City of Monroe

CITY OF MONROE

City of Monroe

City of Monroe

City of Monroe

City of Monroe

City of Monroe

City of Monroe

City of Monroe

CITY OF MONROE

Project Name

Project Description

NORTH CUSTER ROAD BIKE PATH RESURFACING - CRANBROOK PARK TO YMCA DOWNTOWN BRICK PAVER REPLACEMENT

Start Date

RESURFACING OF EXISTING 6-FOOT-WIDE BICYCLE PATHWAY 6/1/2009 REPLACEMENT OF EXISTING BRICK PAVER CORNERS IN DOWNTOWN AREA, VARIOUS LOCATIONS 5/1/2009

A T

MUNSON PARK ACCESS ROAD PAVING

PAVING OF EXISTING UNIMPROVED ROADWAY THROUGH MUNSON PARK

s

O N

5/1/2009

CITY OF MONROE

CITY OF MONROE

CUSTER DRIVE RESURFRACING AND REPLACEMENT OF ALL CURB AND GUTTER SECTIONS, MILLING AND CURB REPLACEMENT - N. CUSTER ROAD RESURFACING OF TOP 3" OF BITUMINOUS PAVEMENT, RELATED INCIDENTAL TO ELM AVENUE WORK 6/1/2009

CITY OF MONROE

CITY OF MONROE

e u

ELM / DIXIE / WINCEHSTER INTERSECTION RECONSTRUCTION

tt i m

EAST ELM AVENUE RESURFACING NORTH MONROE STREET TO NORTH DIXIE HIGHWAY

b u S

CITY OF MONROE

CITY OF MONROE

02262009

d e t

q e R

WEST SEVENTH STREET RESRFACING TELEGRAPH TO UNION

6/1/2009

RECONSTRUCTION OF ENTIRE INTERSECTION TO RAISE GRADE 2 TO 3 FEET IN ORDER TO ACCOMMODATE BETTER ROADWAY GEOMETRY AND FUTURE NON-MOTORIZED PATHWAY 6/1/2009

RESURFACING OF TOP 3" OF BITUMINOUS PAVEMENT, RELATED INCIDENTAL WORK 6/1/2009

MILLING AND RESURFACING OF TOP 3" OF BITUMINOUS PAVEMENT, RELATED INCIDENTAL WORK

5/1/2009

LAPLAISANCE ROAD RECONSTRUCTION - RECONSTRUCTION OF EXISTING ROADWAY PAVEMENT AND BASE, RELATED SCOTT TO JONES INCIDENTAL WORK 5/1/2009

Submitted Requests - Not Approved

O R

PP

EAST NOBLE AVENUE RECONSTRUCTION RECONSTRUCTION OF EXISTING ROADWAY TO RAISE GRADE BY - MICHIGAN AVENUE TO NORTH DIXIE APPROXIMATELY 1 FOOT DUE TO UTILITY STRUCTURES ON CROSS HIGHWAY STREETS

st

Expected Completion Date

9/1/2009

8/1/2009

7/1/2009

9/1/2009

9/1/2009

9/1/2009

8/1/2009

7/1/2009

8/1/2009

Funding Request

D VE $

Route (Infrastructure Only)

PARALLEL TO NORTH CUSTER ROAD FROM CRANBROOK PARK (NEAR CRANBROOK DRIVE) TO THE YMCA, LOCATED EAST OF HUBER 75,000 DRIVE

$

200,000

$

FROM PARK ENTRANCE AT NORTH CUSTER ROAD TO NEARLY 3/4 MILE 150,000 NORTH

$

EAST NOBLE AVENUE MICHIGAN AVENUE TO NORTH DIXIE 150,000 HIGHWAY

$

CUSTER DRIVE NORTH CUSTER ROAD TO WEST 200,000 ELM AVENUE

$

INTERSECTION OF EAST ELM AVENUE, NORTH DIXIE HIGHWAY, AND WINCHESTER 250,000 STREET

$

EAST ELM AVENUE - NORTH MONROE STREET TO NORTH DIXIE 400,000 HIGHWAY

$

WEST SEVENTH STREET - SOUTH TELEGRAPH ROAD TO UNION 190,000 STRET

$

LAPLAISANCE ROAD - SIXTH STREET TO 220,000 JONES AVENUE

138 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Monroe

CITY OF MONROE

City of Monroe

CITY OF MONROE

City of Monroe

CITY OF MONROE

Project Name

Project Description

RIVERVIEW AVENUE RECONSTRUCTION SCOTTWOOD TO MAYWOOD MASON RUN SUBDIVISION PHASE 5 STORM SEWER INSTALLATION PUBLIC SERVICES DEPARTMENT EMERGENCY GENERATOR

Start Date

Expected Completion Date

RECONSTRUCTION OF EXISTING ROADWAY PAVEMENT, REPLACEMENT WITH NEW 8" CONCRETE PAVEMENT AND INTEGRAL CURB, RELATED INCIDENTAL WORK 5/1/2009 CONSTRUCTION OF 27" STORM SEWER THROUGH UNDEVELOPED PORTION OF MASON RUN SUBDIVISION 5/1/2009 EMERGENCY GENERATOR OF SUFFICIENT CAPACITY TO POWER PUBLIC SERVICES DEPARTMENT FACILITY 5/1/2009

T O

7/1/2009 8/1/2009

O R 7/1/2009

Funding Request

$

RIVERVIEW AVENUE SCOTTWOOD AVENUE TO MAYWOOD 250,000 AVENUE

$

250,000

$

300,000

D VE

P P A

N s

t s e

City of Monroe

CITY OF MONROE

u q e

RELINING OF EXISTING SANITARY SEWERS ON 17 DIFFERENT STREETS THAT ARE BEYOND THEIR SERVICE LIFE. REHABILITATE EXISTING SANITARY SEWERS RANGING FROM 60~100 YEARS OLD THAT ARE FAILING SANITARY SEWER COLLECTION SYSTEM AND IN NEED OF REPAIR. PROJECT WOULD PROVIDE FOR AN ADDITIONAL IMPROVEMENTS 50 YEAR SERVICE LIFE.

R d

5/1/2009

11/1/2009

Route (Infrastructure Only)

$

E. & W. FRONT STREETS, NAVARRE STREET (2 LOCATIONS), O'BRIEN & ISLAND STREETS, HUBBLE STREET, E. & W. FRONT STREETS, E. 2ND STREET, SCOTT STREET, JEROME STREET, S. MONROE STREET, WASHINGTON STREET, W. 5TH STREET, W. 6TH STREET, HOLLYWOOD DRIVE, 2,214,089 ALLEYSCAPE

e t tt

i m

b u S 02262009

Submitted Requests - Not Approved

139 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Monroe

City of Monroe

City of Monroe

City of Monroe

City of Monroe

Project Name

Project Description

Start Date

T O

CITY WATER DISTRIBUTION SYSTEM IMPROVEMENTS

FRENCHTOWN TOWNSHIP

INSTALL REDUNDANT RAW WATER PUMPS & APPURTENANCES WITHIN THE RAW WATER PUMPING STATION TO PROVIDE BOTH REDUNDANT PUMPING CAPABILITIES AND PROVIDE RAW WATER CAPABLE OF MEETING THE CITY OF MONROE WATER TREATMENT PLANT CAPACITY RATING. CURRENTLY THE CITY OF MONROE CAN NOT PUMP RAW WATER CAPACITIES AND HAS LIMITED REDUNDANT PUMPING CAPABILITIES TO MEET THE CITY OF MONROE WATER TREATMENT PLANT RATED CAPACITY. REDUNDANT RAW WATER PUMP STATION EXPANSION PUMPING CAPABILITIES AND PUMPING CAPACITY WILL BE PROVIDED. 2/1/2009

t s e

Village of Mancelona

02262009

u q e

UPGRADES TO THE SOUTH CUSTER BOOSTER STATION SERVICE AREA INCLUDING AN ISOLATION VALVE, TWO RIVER CROSSING LOOPS, PUMPING STATION FACILITY EXPANSION, AND ENLARGING WATER MAIN PIPING. ADEQUATE PRESSURE AND FLOW WILL NOT BE PROVIDED TO MEET REGULATORY AGENCY REQUIREMENTS AND MAXIMUM DAY WATER DEMANDS THAT THE CITY OF MONROE IS CURRENTLY UNDER CONTRACT TO PROVIDE.

R d

SOUTH CUSTER BOOSTER STATION SERVICE AREA UPGRADES

e t tt

3/1/2009

Office Renovation

Complete overhaul of the village office, including the police department. The building was built in 1940. Stone work on front of the building is currently falling off and dangerous to people, there is also a lack of insulation behind stonework, creating large heating bills. A new roof in needed to prevent leaking, currently building leaks in police office creating damage to the office. Entire building is not up to current codes and possibly could create hazards. Immediately

plow trucks

Two plow trucks to maintain village streets and parks. The current village plow trucks are 21 years old and17 years old and have cost the village over $20,000 this year alone in repairs. Breakdowns have cost the village time and the inability to maintain roads in an efficient manner which could cause delays in ambulance service and police response time. Snow totals over the last few years have averaged 170 inches, typically 10-12 inches at one time.

i m

Submitted Requests - Not Approved

Route (Infrastructure Only)

S. TELEGRAPH RD, PALMWOOD AVE, O'BRIEN ST, ISLAND ST, W. 6TH ST, WASHINGTON ST, HUMPHREY ST, JEROME ST, E. 2ND ST, E. 4TH ST, EASTCHESTER ST, E. 1ST ST, LINCOLN AVE, E. NOBLE AVE, TREMONT ST, E. VINE ST, N. MONROE ST, W. ELM AVE, E. ELM AVE, W. WILLOW 6,218,800 AVE

D VE

3/1/2011

$

2/1/2010

$

POINTE AUX 891,700 PEAUX ROAD

$

LEWIS AVE, IDAMAYBEE RD, S. CUSTER RD, S. 4,482,020 RAISINVILLE RD

N s

b u S

Village of Mancelona

O R

Funding Request

P P A

REPLACE, REHABILITATE, AND LOOP 26,770 FEET (5.07 MILES) OF 4 INCH ~ 8 INCH DIAMETER UNLINED WATER MAIN ON 25 STREETS; REPLACE ALL LEAD WATER SERVICES AND UPGRADE ALL WATER METERS TO THE RADIO READING SYSTEM WITHIN EACH RESPECTIVE PROJECT LIMIT. A MORE SAFE AND RELIABLE WATER SYSTEM WILL RESULT BY REPLACING, LOOPING, AND REHABILITATING THE TARGETED WATER MAIN SECTIONS AND REPLACING ALL LEAD WATER SERVICES, AND UPGRADING ALL WATER METERS TO THE RADIO READING SYSTEM. 3/1/2009

CITY OF MONROE

MONROE AND RAISINVILLE TOWNSHIPS

Expected Completion Date

9/1/2010

same year as start $

400,000

$

225,000

140 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

The Village of Mancelona currently has several streets that are in disrepair. They are becoming serious safety issues. The Village has over the years done maintenance on them, but it was only for a short term fix. Portions of Maple Street, All of Palmer Park Road and Rose Street need to be pulverized and repaved. All of these roads are major streets and have frequent heavy traffic with heavy loads. Reconstruct Dowling Street between Meade and Ferry Street and Old Channel Trail between Dowling and Church Street 7/9/2009 Install 12" water main along Eilers Road between Dicey and Cook Street to provide more reliable service in the area

City of Monroe

Village of Mancelona

City of Montague

City of Montague

village streets Dowling Street and Old Channel Trail Hill Reconstruction

City of Montague

City of Montague

Eilers Road Water Main

City of Montague

City of Montague

Dicey Street Road Reconstruction and Water Reconstruct Dicey Street and install 12" water main between Stanton and Eilers Road Main Installation in conjunction with a proposed expansion for Montague Public Schools. 7/9/2009

City of Montague City of Montague

City of Montague Montague

Downtown Water Transmission Main Water

City of Montrose

Montrose, City

Public Safety/Water System

GPS System for Water Mains, Hydrants, Valves, Etc.

3/9/2009

City of Montrose

Montrose, City

Fencing Blueberry Park to improve public safety

Replace deteriorated chain-link fence around Blueberry Park to improve public safety so children will not be able to run into the surrounding streets from the playscape area 3/9/2009

Montrose, City

New "stork's" adapters for City fire hydrants to reduce firefighting hook-up time in improving Install new "stork's" adapters to City fire hydrants in order to reduce firefighting hookpublic safety up time needed to improve public safety response time 3/9/2009

Montrose, City Montrose, City Montrose, City

Purchase of new pick-up truck 4WD with snowplow and tommylift Street Maintenance Equipment Street Maintenance Equipment

City of Montrose City of Montrose City of Montrose

Montrose, City Montrose, City Montrose, City

Turning mirrors at the intersection of M-57 (State St.) and Genesee St. to improve public safety by preventing motor vehicle crashes Street Maintenance Equipment Street Maintenance Equipment

City of Montrose

Montrose, City

New City Water Meters System

City of Montrose City of Montrose City of Montrose

tt i m

d e t

City of Montrose

Montrose, City

Purchase storm water sewer drain system video camera to check joints and lines for routine repair maintenance

City of Montrose

Montrose, City

Washington Street

City of Montrose

b u S

Montrose, City

02262009

N s

st

e u

q e R

T O

Purchase of new pick-up truck 4WD with snowplow and tommylift Street Crack Sealer Machine/Equipment Hot Asphalt Patching Machine/Equipmen

Turning mirrors at the intersection of M-57 (State St.) and Genesee St. to improve public safety by preventing motor vehicle crashes High Ranger Machine/Equipment GM 7500 Series Dump Truck/or comparable brand Replacement of Old Water Meters with New Metering System Along with Software to Identify Problems in Office

Purchase and use video camera storm water sewer drain system for routine repair maintenance of joints and lines suffering physical structural damages Reconstruction of Washington Street between State St. (M-57) and Maples street including water, sanitary sewer, and storm sewer lines

Downtown north side alley property acquisition and construction of new parking lot Downtown north side alley property acquisition and construction of new parking lot

Submitted Requests - Not Approved

8/9/2009

O R

P P A

Install a 12" water main from downtown Montague, along Dowling Street to Meade Street, then south west to Wilcox Street, then west along Wilcox Street to the existing main at Cook Street. This project is a recommended improvement in the City's Water Reliability Study which was submitted to the MDEQ. Water

City of Montrose

Expected Completion Date

3/9/2009 3/9/2009 3/1/2009

10/9/2009

Funding Request

D VE

Route (Infrastructure Only)

$

150,000

$

130,000 Dowling Street

$

320,000 Eilers Road

$

550,000 Dicey Street

$ $

Meade, Dowling 1,810,000 and Wilcox Streets 1,200,000 Yes

4/9/2009

$

10,000 City Water System

4/9/2009

$

25,000 Blueberry Park

12/9/2009

$

All City fire 25,000 hydrants

$ $ $

Department of Public works maintenance on all 30,000 City streets 50,000 All City Streets 50,000 All City Streets

5/9/2009 4/9/2009 4/9/2009

6/9/2009 3/9/2009 3/9/2009

7/9/2009 4/9/2009 4/9/2009

$ $ $

Intersection of M57 (State St.) and 50,000 Genesee St. 80,000 All City Streets 100,000 All City Streets

3/9/2009

6/9/2009

$

150,000 City Water System

3/9/2009

3/10/2009

$

All City storm water 150,000 sewer drain lines

11/9/2009

7/10/2009

$

185,000 Washington Street

$

North side downtown alley and purchase property at 119 N. Saginaw 200,000 Street

5/9/2009

10/10/2009

141 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Montrose

Montrose, City

Project Name

Project Description

Start Date

Construction of Carlann Street between N. Saginaw St. and Elizabeth st. including replacement of water and sanitary sewer lines and construction of storm water management sewer system

Carlann Street

11/9/2009

7/10/2009

5/9/2009

11/9/2009

11/9/2009 11/9/2009 11/9/2009

7/10/2009 8/10/2009 8/10/2009

City of Montrose

Montrose, City

City of Montrose City of Montrose City of Montrose

Montrose, City Montrose, City Montrose, City

Perform street asphalt resurfacing maintenance on various City streets suffering Contract for asphalt paving resurfacing maintenance on various City streets suffering minor deterioration minor deterioration through competitive bid award process Reconstruction of Genesee Street between Maple St. and Russell St. including Genesee Street Replacement of Water and Sanitary Sewer Lines City/Lions Park Parking Lot Construct motor vehicle parking lot Blueberry Park Parking Lot Construct motor vehicle parking lot after acquiring additional open space

City of Montrose

Montrose, City

Clark Street Watermain

Replacement and looping of water main line and replacement of sanitary sewer line

11/9/2009

City of Montrose

Montrose, City

New Skate/Ice Park

Construct new multi-purpose outdoors skate park for all seasons with ice skating in winter and BMX bicycling and skate boarding/in-line skating in other seasons

City of Montrose

Montrose, City

West Maple Street

Construction paving of West Maple street between Railroad to West End including building storm sewer lines and replacement of water and sanitary sewer lines

City of Montrose

City of Montrose

City of Montrose

City of Montrose

City of Montrose

City of Montrose

City of Montrose

Expected Completion Date

Funding Request

$

Route (Infrastructure Only)

275,000 Carlann Street

D VE $

300,000 Various City streets

$ $ $

7/10/2009

$

450,000 Genesee Street 60,000 City/Lions Park 60,000 Blueberry Park Clark Street 100,000 Watermain

7/9/2009

10/9/2009

$

New Skate/Ice 200,000 Park

11/9/2009

7/10/2009

$

275,000 West Maple Street

Montrose, City

New telephone/broadband network, new City Hall furniture, new copier and printers, new accounting software system integrated to new cash register and new computer network system for all city office locations, new Purchase and install the equipment systems described in previous column for all city automatic water meter reading interface sy buildings networked together 1/10/2009

3/10/2009

$

350,000 141 Parkway Drive

Montrose, City

Latting and Russell Streets

Construction paving of Latting and Russell Streets between N. Genesee St. and West End including building storm water sewer lines and replacement of water and sanitary sewer lines 11/9/2009

7/10/2009

$

Latting and Russell 500,000 Streets

Montrose, City

New Department of Public Works Building & Complex

Construct new Department of Public Works Main Building to LEED standards and complex including cooperative diesel fuel and unleaded gasoline procurement and distribution system among the City of Montrose, Montrose Community schools, and Montrose Charter Township to reduce costs for all public entities

3/9/2009

3/10/2009

$

600,000 149 Ruth Street

Montrose, City

Complete restoration of Railroad Depot Museum structure to LEED standards, expansion of parking lot, and landscaping improvements to grounds

Complete restoration of historic 1888 Railroad Depot Museum structure to LEED standards along with expansion of asphalt parking lot and additional landscaping improvements to the grounds area

5/9/2009

7/10/2009

$

154 West State 600,000 Street (M-57)

Montrose, City

Reconstruction of Hickory Street between Saginaw Street to Nanita Drive with Hickory Street Reconstruction and Water Main replacement upgrade of water main line, sanitary sewer line, and construction of storm Upgrade water sewer lines system 11/9/2009

7/10/2009

$

1,250,000 Hickory Street

12/10/2009

$

205 South Saginaw 1,250,000 Street

$

New City Hall, parking lot and 1,500,000 grounds

Montrose, City

02262009

d e t

m b u

S

Montrose, City

itt

A T

e u

st

q e R

s

PP

O R

O N

Restoration of City water wells pumps, buildings to LEED standards, treatment and storage tower system for emergency back-up purposes in conjunction with Genesee County Drain Commissioner's Office-Water & Waste Services Division in accordance with recomme

Restore old City water wells pumps, storage buildings, treatment facility, and storage tower system for emergency back-up purposes in conjunction with Genesee County drain Commissioner's Office-Water & waste Services division in accordance with written recommendation provided by MDEQ 3/9/2009

New City Hall, parking lot and grounds

Construct new City Hall structure on existing grounds using LEED guidelines with new asphalt parking lot and grounds landscaping 7/9/2009

Submitted Requests - Not Approved

12/10/2009

142 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Montrose

Montrose, City

Project Name

Project Description

Non-motorized pedestrian pathways

Start Date

Construction of non-motorized pedestrian pathways linking downtown Depot to City/Lions Park to all Montrose Community Schools buildings and public library to Seymour Road to Barber Park in Montrose Charter Township to Blueberry park in City of Montrose loop 3/9/2009

City of Montrose

Montrose, City

City of Montrose

Montrose, City

Acquire easements from downtown building owners to construct historic restoration of front and rear entrance exterior façade Acquire easements from downtown building owners to construct historic restoration of improvements to attract tenants, businesses, front and rear entrance exterior façade improvements to attract tenants, businesses, and customers to existing downtown district and customers to existing downtown district suffering many vacant and deteriorating suffering many vacant and deteriorating s storefronts in DDA Board redevelopment efforts 2/9/2009 Installation and operation of a broadband fiber network system for the entire City of Montrose Broadband Montrose area July, 2009

City of Montrose

Montrose, City & Montrose, Township

New 12" water main line and 24" sewer collection lines and reconstruction of M-57 with new storm water sewer lines system and asphalt paving between Seymour Road and M Install new 12" water main line and 24" sanitary sewer collection line and 13 in cooperation with Montrose Charter reconstruction of M-57 with new storm water sewer lines system and asphalt paving Township between Seymour Road and M-13 in cooperation with Montrose Charter Township

City of Mt. Clemens

Mt. Clemens

Water Filtration Plant Improvements

City of Mt. Clemens

Mt. Clemens

Sanitary Sewer CIPP

City of Mt. Clemens

Mt. Clemens

City of Mt. Clemens

Mt. Clemens

Basin Flushing Gun Improvements Downtown Bike/Hike Path, Rain Garden & Informational Kiosk Project

City of Mt. Clemens

Mt. Clemens

Sidewalk Replacement Program

City of Mt. Clemens

Mt. Clemens

City of Mt. Clemens

Mt. Clemens

City of Mt. Clemens

Mt. Clemens

City of Mt. Clemens

Mt. Clemens

City of Mt. Clemens City of Mt. Clemens

Mt. Clemens Mt. Clemens

City of Mt. Clemens

Mt. Clemens

City of Mt. Clemens City of Mt. Clemens City of Mt. Clemens

02262009

s t s

-N

7/9/2009

O R

$

3,000,000 City DDA district

D VE

July, 2010

Entire City

3,500,000 M-57

7/10/2009

$

7,000,000

7/9/2009

$

500,000

7/9/2009

$

500,000

8/9/2009

$

1,500,000

6/9/2009

$

800,000

9/9/2009

$

4,000,000

12/10/2009

$

1,750,000

8/10/2009

$

8,500,000

2/9/2009

8/10/2009

$

2,750,000

2/9/2009 2/9/2009

8/10/2009 9/9/2009

$ $

6,850,000 1,200,000

R d

Replacement of existing 18" sanitary sewer line and appurtenances in Meadle Street. TV inspection of the sewer line show failures in the pipe due to age. 2/9/2009 Historic rehabilitation of city-owned 1859 train station to retain and expand Michigan Rehabilitation of Edison Train Station Transit Museum. 2/9/2009 Downtown Mt. Clemens Streetscape Project- Construction of new streetscape along Main Street from northbound Gratiot Avenue to Robertson. 2/9/2009 Phase II

e t tt

Construction of new gateways into downtown Mt. Clemens on northbound and Downtown Mt. Clemens Gateway southbound Gratiot Avenue - Welts, Market, Macomb, Cass, Crocker, North River, Improvements and Main Street. Downtown Mt. Clemens Streetscape Project- Construction of new streetscape in the heart of downtown along Macomb Place and Phase I Cherry Street. Downtown Seawall Repair Marine work, sheeting, and dredging in downtown area

$

Non-motorized pedestrian pathways from Depot to all school buildings and public library to Seymour 1,750,000 Road to Bark Park

$

e u

i m

12/10/2009

Funding Request

Downtown Bikepath Connector

Construction of connector from Robertson to county greenway at Shadyside Park.

2/9/2009

8/10/2009

$

350,000

Wastewater Treatment Plant Improvements Water Transmission Valve Replacement Water Main Rehabilitation

Replace chlorine gas treatment with ultravoilet treatment to promote safety, install additional raw sewage lift pump, install sludge press, and perform necessary odor control. Replacement of existing 20" water valves older than 20 years of age Rehabilitation of water mains in the City older than 30 years of age

2/9/2009 2/9/2009 2/9/2009

8/10/2009 8/10/2009 8/10/2009

$ $ $

6,000,000 500,000 1,000,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

11/9/2009

Upgrade and replace four filter beds. Filter bed medium material to be upgraded allow beds to operate more efficiently. Provide and install emergency generator. 2/9/2009 Lining of existing 30" sanitary sewer in Wellington Crescent, parallel to the Clinton River. Lining will eliminate infiltration/inflow and exfiltration. 2/9/2009 Ramp construction for vehicle access for cleaning purposes, furnish and install 4 additional water deluge guns to spray and clean the basin 2/9/2009 Construction of bike/hike path in the City downtown as well as rain gardens and informational kiosks to promote environmental awareness. 2/9/2009 Sidewalk replacement / ADA ramp installation throughout the City to protect the safety of the public. 2/9/2009

eq

7/10/2009

P P A

Meadle Street Sanitary Sewer Replacement

S

Mt. Clemens Mt. Clemens Mt. Clemens

T O

ub

Expected Completion Date

143 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Mt. Clemens

Mt. Clemens

Water Main Replacement & Upsizing

Replacement of existing 4" water main line and appurtenances to 6" water main. The water main is being reconstructed due to age and evidence of fractures and breaks in the system. 2/9/2009

City of Mt. Clemens City of Mt. Clemens

Mt. Clemens Mt. Clemens

Northwest Storm Separation City Hall Reconstruction

Sanitary sewer separation project which will elminate 300,000 cubic feet of rain water from sanitary sewer system during 10 year/1 hour rain events. 2/9/2009 Replacement of 52 year old functionally obsolete structure 3/9/2009

City of Munising

Munising

Fire/Police Hall

City of Munising

Munising

Water/Sewer Improvements

City of Munising

Munising

Elm Street Enhancement

Replace old, totally deteriorated fire hall. Police department is now located in two small rooms without parking. A new, green facility will greatly reduce utility costs. 5/4/2009 Wastewater Treatment Plantand water/sewer line upgrades to satisfy MDEQ consent order requirements 5/4/2009 Street/Sidewalk/Lighting improvements between City Hall and County Court House. Five-block major street. 5/4/2009

City of Munising

Munising

Boat Launch & Restrooms

Large boat entry facilities to Lake Superior. Fish cleaning and restroom facilities

City of Munising

Munising

Landmark Building Renovation

Joint Project to renovate large downtown landmark building for retail development

City of Munising

Munising

City of Munising

Munising

City of Munising City of Munising

Munising Munising

City of Munising

Munising

City of Muskegon

Muskegon

City of Muskegon

Muskegon

Bike Path Bike Path 5/4/2009 Demolition and Disposal of Old Municipal Fire Hall/Dpw Building Disposal of Abandoned DPW/Fire Hall for Retail Development. Joint project with DDA5/4/2009 New Traffic Signal. Joint project with City and DDA, to control traffic between Traffic Signal business district and Pictured Rocks Cruises/Marina 5/4/2009 Automated Utility Reading Install Automated Water Meter Reading 5/4/2009 Reconstruction of H-58 from M-28 East to City Limits. Alger County is presently H-58 Reconstruction completing H-58 to Grand Marais. 5/1/2010 Reconstruction of Muskegon Ave - Sixth St. to Reconstruction of Muskegon Ave. from Sixth St. to Pine St. including green spaces, Pine St. sustainable drainage 2009 Reconstruction of Webster Ave - Ninth St. to Reconstruction of Webster Ave. from Ninth St. to Pine St. including green spaces, Pine St. sustainable drainage 2009

City of Muskegon City of Muskegon City of Muskegon

Muskegon Muskegon Muskegon

City of Muskegon

Muskegon

City of Muskegon

Muskegon

City of Muskegon

Muskegon

City of Muskegon City of Muskegon City of Muskegon

Muskegon Muskegon Muskegon

T O

s t s

10/30/2009

$

1,100,000

10/30/2009

$

M-28 to Varnum 450,000 Street

5/4/2009

10/30/2009

$

435,000

4/27/2009

6/1/2010

$

1,300,000

10/30/2009

$

Maple Street to 414,000 Washington Street

10/30/2009

$

340,000

6/26/2009 10/30/2009

$ $

140,000 M-28 & Elm Street 375,000

10/30/2010

$

875,000 M-28 to City Limits

9/1/2009

$

400,000

9/1/2009

$

1,000,000

9/1/2009 12/1/2009 12/1/2009

$ $ $

2,000,000 750,000 2,000,000

9/1/2009

$

350,000

Spring 2010

$

500,000

12/1/2009

$

300,000

9/1/2009 9/1/2009 9/1/2009

$ $ $

600,000 600,000 600,000

9/1/2009

$

700,000

9/1/2009

$

1,000,000

7/1/2009

$ $

150,000 230,000

-N

i m

City of Muskegon

Muskegon

City of Muskegon

Muskegon

City Hall Building

City of Muskegon City of Muskegon

Muskegon Muskegon

Muskegon Public Works Building Bike Path, Phase IB

Improvements to parking area. Porous Pavement. Make building energy efficient. construct the last piece that connect the Musketawa trail to Laketon

Submitted Requests - Not Approved

O R

P P A

Improvements to the former Central Fire Station to convert to office use, allowing for up to 50 working spaces. Add wind turinines, LED lighting, and green roof. Make ADA compliant. 5/1/2009 Make City Hall more energy efficient by adding wind turbines, green roof, energy efficient light bulbs, porous material for parking areas. 5/1/2009

02262009

D VE

1,900,000

e t tt

Former Fire Station Retrofitting

3,000,000

$

R d

S

8/10/2009 8/10/2009

$

1,000,000 3,500,000

Relocate the Farmer's Market to the parking to lot on Morris St. in the developing new downtown area. Plans call for a new structure that would accomidate some year Farmer's Market Relocation round vending areas and space for a restaurant. 7/1/2009 Terrace St. Reconstruction Reconstruction of Terrace St. from Apple Ave. to Western Ave. 5/1/2009 Sherman Ave. Reconstruction Reconstruction of Sherman Ave. , Lincoln to Henry 5/1/2009 Reconstruction of Muskegon Ave - Sixth St. to Reconstruction of Muskegon Ave. from Sixth St. to Ninth St. including green spaces, Ninth St. sustainable drainage. 2009 McGraft Park Building-Improvements & Retrofit for Energy Savings Improvements to the building and retrofit for energy savings. 2009 Expansion of current building. Addition of alternative energy equipment (wind turbine, Surf Shack LED lights, etc.). Suite for additional commercial space. 5/1/2009 Remodel annex, add locer rooms, upgrade restroom facilities, aoncert to energy LC Walker Arena Restaurant / Clubhouse efficient building and add restaurant accomidations. 5/1/2009 Clay Hill Sanitary Sewer Alinning of sanitary sewer to prevent sewer backups 5/1/2009 Water Filtration Plant Wind Turbines Large Wind Turbines to power the Water Filtration Plant 5/1/2009

ub

8/10/2009

Funding Request

Route (Infrastructure Only)

$ $

e u

eq

Expected Completion Date

2009 7/1/2009

10/30/2009

144 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Muskegon

Muskegon

Kruse Park Upgrades

Project Description Upgrades to the parking area and facilities at Kruse park. Porous pavement, LED lights.

City of Muskegon

Muskegon

Shoreline Dr. Pedestrian Bridge

Construct a predestrian bridge over Shoreline Dr. from the LC Walker Arena to the parking lot across the street. Paring lot improvements, porous pavement.

City of Muskegon City of Muskegon

Muskegon Muskegon

Muskegon County Fire & Police Departments Construct Police and Fire training facility. Smith-Ryerson Park Building improvements including green elements, addition of tennis courts

City of Muskegon

Muskegon

City of Muskegon City of Muskegon City of Muskegon City of Muskegon City of Muskegon City of Muskegon City of Muskegon

Muskegon Muskegon Muskegon Muskegon Muskegon Muskegon Muskegon

Former Fly Ash Site / Consumers Milling & Resurfacing of Latimer/Port City Industrial Park Veridian Dr. Road Connection Veridian Dr. Reconstruction Ottawa St. Bridge Reconstruction Getty St. Reconstruction Sanitary Sewer Improvements Laketon Ave. Reconstruction

City of Muskegon

Muskegon

Henry St. Extension

City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

City of Muskegon Heights

City of Muskegon Heights City of Muskegon Heights

Project Name

2009

7/1/2009

2009

12/1/2009

2009 2009

9/1/2009 7/1/2009

P P A

Reconstruction of Latimer/Port City Blvd. from Black Creek Rd to Laketon Ave. Connect Veridian Dr. and Terrace Point Dr Reconstruct easterly portion of Veridian Dr. to Seaway Dr Reconstruction of Ottawa St. bridge. Reconstruction of Getty St. from Laketon Ave to Apple Ave. Sanitary Sewer Improvements from Blackcreek Rd. to Sherman Blvd. Reconstruct road from Getty to Park. Extend Henry St. north of Laketon Ave. to Western Ave. The project will link the Henry street business district to downtown.

T O

N s

2009 9/1/2009 9/1/2009 9/1/2009 9/1/2009 2009 2009

$

D VE

1,400,000

$ $

1,500,000 1,700,000

$

3,000,000

$ $ $ $ $ $ $

400,000 100,000 250,000 450,000 800,000 850,000 1,200,000

$

2,000,000

1/1/2010

$

1,000,000

1/1/2012

$

2,000,000

9/1/2009

9/1/2009 7/1/2009

9/1/2009 12/1/2009 Spring 2010 12/1/2009

7/1/2010

Muskegon Heights Muskegon Heights

Merriam / Hoyt St Replacement

Reconstruction of Merriam Street from Hoyt Street to Peck Street

10/1/2009

6/30/2012

$

2,000,000

Muskegon Heights

Peck Street Replacement

Reconstruction of Peck Street from Norton Ave to Keating Ave

10/1/2009

6/30/2012

$

3,000,000

Muskegon Heights

Expansion of Muskegon-Ottawa Bike Trail along Seaway Drive through Mona Lake Park north along Hoyt Street to Norton Avenue connecting to Peck Street to existing MuskOttaw Bicycle Trail Expansion and Street connection at Peck Street and Laketon Avenue. Repaving of Peck Street from Norton Improvement Avenue to Keating Avenue. 7/1/2011

1/1/2012

$

4,000,000 X

2010

2012

$

4,500,000 X

10/1/2009

6/30/2012

$

4,500,000

1/1/2010

$

5,000,000

1/1/2010

$

8,000,000 X

6/1/2011

$

Muskegon Heights

e u

eq

R d

e t tt

Muskegon Heights

Edgewood Green Village Infrastructure Improvements

Muskegon Heights

Major Street Replacement

i m

S Muskegon Heights

Rowan Park Expansion

Muskegon Heights

Residential Street Replacement

Muskegon Heights

Muskegon Heights Wind Energy Project

02262009

st

Development of 17 acres into a green residential subdivision on Wood Street. Infrastructure improvements would include new roads, sewer and waterlines, development of alternative energy measures such as wind, solar and other green energy resources. Reconstruction of Hackley Ave, Sherman Blvd, Broadway Ave from Peck Street to Glade Street

Rehabilitation and expansion of a 1.5 acre park in the city’s Central Business District. Acquisition and demolition of one city block of houses on Baker Street across from the park. Installations of underground utilities, new water sprinkling system, re-sod entire park and install above ground video security system. Construct new outdoor performance stage, splash/wading pool, reconfigure parking lot and connect park with Strand Performance Center, install permanent game boards, picnic shelters and park seating. 7/1/2009 Replacement of 8 residential street, sewer and waterlines, from Keating Street to Seaway Drive, and from Getty Street to Glade Street. 7/1/2009 Development of wind turbine sites for the generation of residential, commercial and industrial energy. 1/1/2010

Submitted Requests - Not Approved

Route (Infrastructure Only)

250,000

$

O R

Development of the Shoreline Trail to expand public access property and waterways. Development of a sports complex to include up to 8 soccer fields. 2009

Funding Request

Acquisition of additional land for park redevelopment. Install underground utilities, water sprinkling system, security cameras and re-sod park; redevelop baseball fields per National Little League specifications; construct basketball courts, children splash Charles Lindbergh School / Park Development pool, small picnic, restroom and seating areas. 7/1/2009 Construction of a centrally located youth center for social and recreation services Construction of Youth Center delivery. 7/1/2011

ub

City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

Start Date

Expected Completion Date

10,000,000

145 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Muskegon Heights Muskegon Heights

City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

City of Muskegon Heights

City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

Project Name

Project Description

Start Date

Expected Completion Date

Pedestrian Crosswalk over Seaway Drive

Overpass across Seaway Drive for pedestrian use.

7/1/2011

1/1/2012

Muskegon Heights

Muskegon Heights Market Place and Train Station Plaza

Incorporation of the Muskegon Heights Market Place (Farmers Market) with the Train Station Project. Project will include construction of new plaza, market place building and train station; railroad track repair and upgrade where needed. 6/1/2009

1/1/2010

Muskegon Heights

Manahan Street Repairs

Muskegon Heights

Peck Street Broadway Streetscape

Construction/Opening of Manahan Street from Peck Street to Jefferson Street. Peck Street from Summit Avenue to Hackley Avenue, Broadway Street from Hoyt Street to Sixth Street

Muskegon Heights

Construction of Fire Station Construction of Department of Public Works Building Muskegon Heights High School Athletic Building Expansion

Contruction of a 6,000 sq.ft. new fire garage, office space and sleeping quarters 10/1/2009 Construction of new public works facility including public works & utilities department on former Bennett Pump Site 7/1/2010 Construction of auxiliary gymnasium with seating, dressing rooms, showers, restrooms and fitness center. 7/1/2009

Muskegon Heights Muskegon Heights

Muskegon Heights

Muskegon Heights

1/1/2011

$

5,000,000

1/1/2010

$

City of Muskegon 5,500,000 Heights

Strand Building Renovation

Anchor building in the city’s central business district. Project includes the historic renovation of theater, first floor commercial rehabilitation with second & third floors mixed commercial & residential.

PP

2,500,000

6/1/2009

1/1/2010

$

9,000,000

Mona View Cemetery

Rehabilitation of the city’s historic cemetery including the installation of a water sprinkling system, re-sod entire cemetery, renovated water fall/fountain on Airline Drive; move and replace service drive; repair retaining wall, memorial chapel, administrative buildings and new signage

7/1/2009

6/1/2010

$

2,500,000

1/1/2010

$

2,500,000

4/1/2010

$

1,800,000

7/1/2010

$

3,000,000

6/30/2010

$

3,000,000

1/1/2010

$

3,000,000

10/1/2010

$

4,000,000 X

12/1/2010

$

5,600,000

s

R d

Muskegon Heights

e t tt

Muskegon Heights

Muskegon Heights Water System Upgrade

Muskegon Heights

Redevelopment of the Waste Water Treatment Plant and Dept of Public Works Building

Muskegon Heights

S

02262009

Upgrades to the Muskegon Heights water infiltration plant and pumping station including ADA upgrades, enhanced internal and external security systems; alternative wind energy systems, new sewer and waterlines. 7/1/2009

Demolition of waste water plant; environmental assessment and demolition of the public works building; installation of public green infrastructure for a 12 acre mixed residential / commercial/ recreation use development. 4/1/2009 Redevelopment of a 34 acre urban park with a conference center, outdoor Mona Lake Park Redevelopment Project (ED) entertainment&exhibit center and a lakefront outdoor sports facilities. 6/1/2009 Downtown Security in the Muskegon Hts Installation of cameras and hiring of (3) police officers to monitor criminal activities in Central Business District the downtown central business district. 1/1/2009

i m

ub

Muskegon Heights

Muskegon Heights

A T

Muskegon Heights Youth Micro Business Development Project Muskegon Heights Business Development Fund

1/1/2011

$

25,000,000

$

O R

7/1/2010

u q e

Muskegon Heights

D VE $

7/1/2010

t s e

Muskegon Heights

10,000,000 X

$

O N

1/30/2011

$

1,000,000 X City of Muskegon 2,000,000 Heights

The redevelopment of a former dilapidated, polluted industrial site in the city’s downtown area. Activities include: subdivision of land into lots, installation of Bennett Pump Site Redevelopment (Public underground green utilities, alternative energy /wind facilities, upgrading of service Works) roads and construction of green business incubator. 7/1/2009 Muskegon Family Care Inc., Facility Expansion of the existing site to increase office space interview rooms and a Expansion community room for clients of the Federally Qualified Health Care Center. 10/1/2009 Acquisition of property adjacent to Mona Lake Park for recreation, land easements Acquisition of Property and mixed use construction. 7/1/2009 Consolidation of West Michigan Therapy clinical and residential Treatment centers on West Michigan Therapy, Facility Construction one site. New green LEED rated building. 1/1/2009

Muskegon Heights

Muskegon Heights

10/1/2009

Funding Request

Route (Infrastructure Only)

6/1/2010

$

500,000

The development, coordination of youth business development services and projects. The establishment and monitoring of youth micro businesses located in the Muskegon Heights Market. 1/1/2009

6/1/2010

$

800,000

Recapitalization of the city’s economic development fund for business gap financing. 7/1/2009

1/1/2010

$

1,000,000

Submitted Requests - Not Approved

146 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Newaygo

City of Newaygo

Project Name

Project Description

Start Date

City of Newaygo Museum

The Newaygo museum is a historic building dating back to the early 1900s. It does not have a heating or cooling system or any windows and housed over 1.6 million dollars in historic artifacts which have been slowly deteriorating over the years. The City was able to obtain some grant funds to build a 40' x 60' storage building in which college students, over the summer of 2008, were able to categorize, electronically inventory and pack up all the inventory from the museum and place in the storage facility. This was done in hopes that the museum might be able to be renovated and better utilized for the community and county. The museum is an old Portland Cement Company building (1901) and sits directly on the Muskegon River. It lies adjacent to one of the City's many beautiful parks. The project would consist of renovating the building and bringing it back to its original state with a new enery efficient heating and cooling system, new energy efficient windows and doors and new roof this landmark could be open year round for citizens, visitors and tourists alike to visit. 5/1/2009

City of Newaygo Library / City Hall

The City of Newaygo currently has a Carnegie Library that was built in 1915. The library is 3,000 SF and not handicap assessible. The City needs funding to expand the library as well as to make it handicap assessible. The library is not large enough for the volumn of patrons who visit each month. People come from not only the City but surrounding townships. The library would like to expand to offer more programs to children but currently the children area is not large enough to accomodate. It also needs updated heating and cooling systems and energy efficient windows and lighting Next door is City Hall. The plan is to connect to City Hall to increase opportunities for collaboration and cost sharing. City Hall is at capacity with no more space to hire additional employees. We would like to renovate an old auditorium to be utilized for Council and other meetings as well as be a large space for elections which are held up to four times a year in the City. This would free up space for more offices and other needed facilities in other parts of City Hall. 4/1/2009

A T

City of Newaygo

City of Newaygo

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

5/30/2010

$

1,300,000

4/1/2010

$

1,400,000

5/1/2010

$

798,000

10/1/2010

$

178,620

O N

u q e

City of Newaygo

City of Newaygo

R d

Automation of Controls for Water and Sewer system

e t tt

i m

b u S City of Newaygo

City of Newaygo

02262009

In order to reduce the City's carbon footprint, the City needs to automate the monitoring and operation of the water and sewer system controls. Currently all controls are manual and require physical onsite labor to operate or take meter readings. This is extremely inefficient, requiring many labor hours and numerous automobile trips which use many galllons of fuel. Automated computer controls will produce quicker response times to emergencies increasing community safety. Computer controls will also collect valuable data that can be used for predicting failures and prolonging equipment life.

Muskegon River Joint Public Safety Project

4/15/2009

The Muskegon River spans the width of Newaygo County, flowing through the City of Newaygo. The river is famous for its fishing and its recreational opportunities, drawing tourists regionally and nationally. There are local canoe and inner-tube rental businesses along the river and each year thousands of people recreate by floating down the river. Unfortunately, this has brought many criminal problems; drunken and disorderly conduct, narcotics use and sales, assaults, thefts, littering, illegal boating and even drownings. Currently, the Newaygo Police Department and Newaygo County Sheriff do not have the funds for policing this influx of problems along the river and in the city parks. This project would work Newaygo Police Department officers and the Newaygo County Sheriff deputies in a combined effort to lessen criminal activity, encourage a safe environment for the tourists and residents and also to protect this natural resource. This project would create a number of police officer jobs and bring more tourists to the area because of the safer environment created on the Muskegon River. 4/15/2009

Submitted Requests - Not Approved

147 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Newaygo

City of Newaygo

Project Name

Project Description

Start Date

Community Business Center (CBC) and business incubator

The City of Newaygo is considering purchasing the second floor or condo unit (13,000 sq. ft.) of a building that is breaking ground in our downtown district. The first floor will be available for leaseing to retail shops and the second floor will be a Remote Work Center known as "The Steam". The City has partnered with Haworth, Inc. on the second floor to make it LEED certified and hi-tech for those wishing to work closer to home in an office environment. Spaces and offices will be available to "members" who wish to work remotely. This concept will be marketed and furnished by Haworth, Inc. to be a model for other cities and communities throughout the United States. Newaygo being a rural community but yet only 40 miles from major cities is a perfect place to have a remote work center. Eductional opportunities will also be offered as well as hi-tech training facilities. We are looking at funding to help offset the costs of the second floor and to make it LEED certified. 3/15/2009

Riverbank Development / Waste Water Treatment system Expansion

A developer has purchased 226 acres of property, some of which are adjacent to the Muskegon River. The developer is going to be building a lodge and condos and needs to put in 2.6 miles of road to get back to the lodge and condos. The City of Newaygo, because of this new project, will need to increase it's sewer plant capacity to go from 400,000 gallons to 1 million gallons as well as put in new sewer infrastructure, water infrastructure, water tower, storm drains, paving, curbs and gutters. This is a huge opportunity for the City of Newaygo to expand housing and provide lodging for visitors and tourists. 4/1/2009

A T

City of Newaygo

City of Newaygo

t s e

City of Newaygo City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles

City of Newaygo City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles City of Niles

Wood St Reconstruct/Repaving

City of Northville

City of Northville, MI

Sanitary Sewer Rehabilitation project

City of Northville

City of Northville, MI

Watermain Replacement Project

Wood St is located in one of the oldest parts of the City of Newaygo. Elements along the road such as the brick-laid manholes date back to the early 1900s. This road is useful to County, State, and Federal persons since it serves as the only access to the Newaygo Post Office. Wood St is the only detour option if highway M-37 is closed due to construction or local events. Parking Lot Improvement (Second St.) Intersection Safety Project (Wayne St.) Intersection Safety Project (E. Main St.) Parks Department Maintenance Facility Bridge Repairs - 4 Locations City-wide Street Paving (New Construction) Energy Savings Project - Public Bldgs Wastewater Treatment Plant Improvements Parking Lot Construction (Plym Park) Airport Runway Resurfacing Fencing Project (Plym Park) Parking Lot Improvement (Street Dept.) Cemetery Road Paving City-wide Street Resurfacing City-wide Sidewalk Replacement

u q e

e t tt

i m

City of Northville

City of Northville, Michigan Downtown Street Lighting Upgrade

City of Northville

City of Northville, Michigan City Hall Energy Efficiency Project

4/1/2009 9/1/2009 8/1/2009 9/1/2009 10/1/2009 8/1/2009 7/1/2009 5/1/2009 6/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

Line and seal existing sanitary sewer pipe to elimiante water infiltration into the pipe. June, 2009 Replace and undersized 6/8" watermain with a new 12" watermain to improve fire protection in the town. June, 2009 Change street lights from high pressure sodium vapor street lighting to LED street lighting reducing energy use in half and extending the usfull life of the fixture from 18 months to 8 years. May, 2009 Renovations to heating and cooling system, lighting, plumbing, and building insulation in the Northville City Hall. April, 2009

Submitted Requests - Not Approved

O R

PP

O N

R d

b u S

02262009

s

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

12/1/2009

$

4,000,000

6/30/2010

$

37,000,000

9/30/2009 12/31/2009 11/30/2009 12/31/2009 6/1/2010 5/1/2010 7/1/2010 6/1/2010 7/30/2010 9/1/2009 9/1/2009 9/1/2009 9/1/2009 10/1/2009 7/1/2010 12/1/2010

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

771,000 100,000 200,000 600,000 750,000 1,500,000 2,400,000 3,000,000 10,000,000 125,000 215,000 40,000 60,000 250,000 3,000,000 6,000,000

may, 2010

$

300,000

5/1/2010

$

700,000

May, 2010

$

400,000

February, 2010

$

1,300,000

148 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Northville

City of Norton Shores

City of Norton Shores

City of Northville, Michigan Purchase of Electric Utility Trucks

Project Description Purchase four electric utility trucks for Public Works Department fleet to perform routine service in the water and streets division.

Norton Shores

Grand Haven Rd Reconstruction

Reconstrucion of 1 mile of roadway including drainage improvements and some sidewalk

Norton Avenue Reconstruction

Reconstrucion of 1.1 miles of roadway including drainage improvements and watermain replacement. Reconstrucion of 2.2 miles of roadway including drainage improvements and some sidewalk.

Norton Shores

Project Name

City of Norton Shores

Norton Shores

Pontaluna Rd. Reconstruction

City of Norton Shores

City of Norton Shores

Getty Street Improvements

City of Norton Shores

Norton Shores

Henry St Reconstruction

Reconstrucion of 1.25 miles of roadway including drainage improvements and sidewalk.

Start Date April, 2009

Norton Shores

Getty St Reconstruction

Reconstrucion of 1.15 miles of roadway including drainage improvements.

City of Novi

City of Novi

Nine Mile Road

City of Novi

City of Novi

City of Novi

May, 2010

8/1/2009

150,000

$

Norton Avenue, Henry St to 1,775,000 Roosevelt Rd

$

Pontaluna Rd, Grand Haven Rd to 3,000,000 Henry St

12/9/2009

$

2,500,000

10/1/2009

$

Henry St, Hile Rd 1,850,000 to Seminole Rd

O R

PP

5/1/2009

$

$

10/1/2009

6/1/2009

Funding Request

Route (Infrastructure Only)

Grand Haven Rd, Pontaluna Rd to 1,700,000 Wilson Rd

11/1/2009

6/1/2009

A T

City of Norton Shores

Expected Completion Date

11/1/2009

D VE

Getty St, Seaway Dr to Braodway 2,750,000 Ave Meadowbrook to 593,688 Haggerty

5/1/2009

10/1/2009

$

Pavement repairs and repaving the one mile length of 2- and 3- lane roadway.

7/1/2009

10/1/2009

$

Nine Mile Road

Pavement repairs and repaving the one mile length of 2- and 3- lane roadway.

7/1/2009

10/1/2009

$

City of Novi

Meadowbrook Rd

7/1/2009

10/1/2009

$

City of Novi

City of Novi

NW Quad Ring Rd

Pavement repairs and repaving the one mile length of 2- and 3- lane roadway. Constructiion of a one-third mile long roadway consisting of a 4-lane boulevard to connect two major thoroughfares.

8/15/2009

9/1/2010

$

City of Novi

City of Novi

Beck Road

Pavement repairs and repaving the one mile length of 2- and 3- lane roadway.

7/1/2009

10/1/2009

$

556,600 Novi to Taft Eight Mile to Nine 653,200 Mile Novi Road to 3,494,800 Grand River Ave Nine Mile to Ten 510,000 Mile

City of Novi

City of Novi

Grand River Ave

Pavement repairs and maintenance overlay of the over two mile length of 2- and 3lane roadway to extend pavement life until reconstruction/widening occurs in 2025.

8/15/2009

12/1/2009

$

920,000 Novi to Haggerty

City of Novi

City of Novi

Novi Road

9/1/2009

12/1/2009

$

City of Novi

City of Novi

Signalizations Program

7/1/2009

12/1/2009

$

951,050 I-96 to Twelve Mile Various 822,000 Intersections

City of Novi

City of Novi

City of Novi

City of Novi

City of Novi

City of Novi

City of Novi City of Novi

City of Novi City of Novi

City of Novi

City of Novi

02262009

itt

e u

d e t

q e R

Pavement repairs and repaving the half mile length of 6-, 7- and 8- lane roadway. New traffic signals at two intersections (Beck/Cider Mill, Wixom/Ten); signal support improvments at six Novi Road intersections.

Meadowbrook Glens Sanitary Sewer Fuerst Park

Pedestrian and bicycle pathways to fill gaps along a major arterial and adjacent to elementary school. Improve three storm water detention basins (C&O, Cedar Springs, McManus) to attenuate flooding and prevent erosion downstream. Upgrade four sanitary lift stations to improve energy efficiency and mitigate risks to human health and the environment. Rehabilitate failing sanitary sewer to address inflow/infiltration issues, which diminish the city's sanitary capacity. Construction of a new 6.5 acre park.

Solar Photovoltaic System - Civic Center

Installation of solar photovoltaic collectors on the roof of the Novi Civic Center to generate electricity and realize an annual reduction in annual electrical power consumption of over 13,000 kwh, resulting in savings of $1,100 per year.

Non-motorized Pathway Program

bm

Regional Basin Retrofit Program

u S

st

s

O N

Sanitary Lift Station Upgrade Program

Submitted Requests - Not Approved

7/1/2009

12/1/2009

$

Ten Mile/Catherine to Hampton Hill; Willowbrook/ Guilford to Oak 259,500 Tree

6/1/2009

11/1/2009

$

605,000

5/1/2009

9/1/2009

$

453,100

7/1/2009 5/1/2009

12/31/2009 7/31/2009

$ $

330,000 440,000

5/1/2009

7/1/2009

$

106,889

149 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Novi

City of Novi

Project Description

Start Date

School Resource Officer

The City of Novi Police Department currently has one School Resource Officer (SRO) Assigned to the Novi High School. This Officer is also responsible for activities and investigations at other facilities related to Novi Community Schools. It would be extremely beneficial to this program to add a second SRO and have that Officer assigned to The Novi Middle School. This would allow Officers to split the District assignments such as disaster drills, lock down drills and other School District extra curricular activities. Additionally, other investigations and educational programs would be handled by the officer more familiar with the building and personnel. We are requesting funding for one additional School Resource Officer. Immediate

Novi, Michigan

Applicant Live Scan for Records/Investigations

Police department staff would have the ability to fingerprint citizens of Novi via an approved state livescan system for applicant purposes. The system allows for immediate transmission of the fingerprints to the state for immediate processing. The state has mandated that specific applicant fingerprints must be transmitted to the state via a livescan system. Currently the closest location is Livonia with limited hours. Convenience of the location will save time and money for the citizens and timely submission of fingerprints. Immediate

Novi, Michigan

The sole purpose of granting Novi Police Department rapid visual access to the various malls and Novi Civic Center interior and exterior. This would establish a connection between Twelve Oaks Mall existing camera system and the Novi Police Department for the sole purpose of granting law enforcement rapid access to the Digital Camera System Connecting Twelve Oak Mall, Main Street, Fountain Walk Mall and mall’s interior and exterior camera system. The project would also establish pan, tilt Novi Civic Center to the Novi Police and zoom cameras around the local shopping districts for viewing at the police Department department.

Novi, Michigan

City of Novi

Project Name

Expected Completion Date

T O

O R

P P A

N s

t s e

Immediate

Funding Request

D VE

Within 90 days of approval

$

115,500

Within 90 days of approval

$

22,000

Within 180 days of approval $

300,000

The Senior Education Program will provide two specific programs for all Novi residents fifty five years of age or better. The Mature Driver Workshop is offered in conjunction with the Traffic Improvement Association, TIA, to provide education and training for any Novi resident who may be interested in improving road safety. Participants of this program will have the opportunity to evaluate their driving strengths and deficiencies, understand the effects aging has on a driver's skills, created driving strategies and learn compensation skills for any diminished abilities. The Emergency Preparedness program provides support and education to the seniors. The following topics will be covered, severe heat and cold temperatures, chemical emergencies, vial for life program, personal safety and mass casualty response. Immediate

Within a year of approval

$

14,000

This unit will specifically be dedicated to crime prevention and apprehension of criminals. Officers assigned to this unit will focus their enforcement and prevention activities on specifically identified crime patterns and trouble spots. The formation of this unit will require the hiring of two additional police officers.

On-going

$

240,000

Winter 2010

$

17,500,000

Route (Infrastructure Only)

u q e

City of Novi

Novi, Michigan

City of Novi

Novi, Michigan

R d

i m

Crime Suppression Unit

b u S City of Oak Park

City of Oak Park

02262009

e t tt

Senior Citizen Education Program

City building energy reduction project

6/1/2009

This project will replace the old, undersized, inefficient and functionally deficient City Hall, Public Safety (police and fire), and Court with new energy efficient buildings. These buildings will take into consideration the needs of the community and staff to efficiently perform the business of the City of Oak Park. A schematic design package with design development was done in 1998 and an independent needs assessment was done in 2008 for the City Complex. The assessment showed that the current City buildings were inadequate for the current staffing levels and needs of the employees and residents of the City. The City is interested in energy conservation and we have already hired an architect to design new buildings with a goal of achieving a LEED Spring/Summer gold standard and a minimum requirement of LEED silver. 2009

Submitted Requests - Not Approved

150 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Onaway

Onaway, MI

Runway Reconstruction

City of Otsego

City of Otsego

Rvierfront Tral Extension

Existing runway and taxiway pavements have deteriorated and are in need of reconstruction. Airport provides a valuable transportation link and is a vital part of the community; however it is ineligible for federal funds. Runway was originally paved in 1971. Existing pavement has deteriorated so badly that the pavement has needed extensive crack sealing 4 times in the last 12 years. Existing navigational lighting aids along runway will be replaced with updated fixtures which will provide a safer more energy efficient system. This work will allow this airport to provide an important transportation link for this rural community. The continuing deterioration of this pavement will soon begin to limit operations and cause people to relocate to another area. Project will create temporary construction jobs and preserve jobs that are currently tied to the airport. 5/1/2009 Extend existing 10 foot wide paved Riverfront Trail approximatley 4,00 linear feet westerly to City park. Phase II of III.

City Transfer Station Relocatoin

New construction of City Transfer Station, to complete relocation of City Department of Public Works facilities allwoing commercial redevelopment in downtown adjacent to Kalamazoo River. Spring 2009

PP

9/1/2009

City of Otsego

city of Otsego

A T

O R

Funding Request

D VE

8/1/2009

$

870,000 Rwy 15/33

$

320,000

180 days from start

$

357,000

12/31/2009

$

City of Owosso

City of Owosso

Holman Pool Rehabilitation

Owosso is designated as a low/mod community. Owosso has a 50 year old Holman Pool which is free to the public. The Pool needs to be rehabilitated and rebuilt. We have a partnership with several local public/private partners to develop a new pool recreation area.

City of Owosso

City of Owosso

Federal Aid Road Projects

Owosso is a low/mod community. We want to rehabilitate 10 homes in the next year. 8/1/2009

Dec 1. 2009

City of Owosso

LED Light Conversion

Owosso is investing $4 million in a downtown streetscape in 2008-2010. This LED light conversion would be part of the streetscape development. The City had this in the original plan, but could not afford the conversion. This investment will save the City 60% of lighting costs in downtown.

July 31,2009

$

City of Owosso

The Steam Railroad Institute is nonprofit entity located in the City of Owosso. The SRI brings in approximately 30,000 visitors a year to our area. The SRI is home of the "North Pole Express" The SRI needs to expand to meet this tourism demand. The City is working with the SRI to create jobs and develop infrastructure around this location. We will build and develop a new public parking lot, a new public area with green space, and a new visitor center. This project would also join two other MDOT Enhancement projects, other private funding, and a DEQ funded project. We have Steam Railroad Institute Development Project spoken with MEDC on this project 6/1/2009

9/1/2009

$

Construct a central community center facility with indoor recreational facilities such as tennis courts, racquetball courts, youth meeting areas, cultural venues such as an amphitheater and town hall community room. The ideal size of the facility would be 50,000 square feet with sizeable outdoor space to accommodate seasonal events. 8/15/2009

11/15/2010

$

5,500,000

River Reach Main Road City wide conductivity

6/15/2009 6/15/2009

11/15/2010 11/15/2009

$ $

756,000 1,070,000

Pump Station on-site Generators (2)

5/15/2009

11/15/2009

$

72,000

Sanitary manhole replacement Park & Hubbard

5/15/2009

11/15/2009

$

180,000

City of Owosso

City of Owosso

tt i m

st

e u

d e t

q e R

6/1/2009

80,000 City Park Area Housing

300 Downtown 80,000 Streetlights

150,000 Infrastructure

City of Parchment

Parchment

City of Parchment City of Parchment

Parchment Parchment

City of Parchment

Parchment

City of Parchment

Parchment

City of Parchment City of Parchment

Parchment Parchment

River Reach Trailway Thomas/Orient Sanitary Sewer

14,100 LF of trail way connecting city central recreation area to Kindleberger Park Thomas/Orient Sanitary Sewer Replacement (2000 LF)

5/15/2009 5/15/2009

11/15/2009 11/15/2009

$ $

570,000 720,000

City of Parchment

Parchment

Switches for fluoride receptacle outlet

Install a flow switch or pressure switch in series to the fluoride receptacle outlet.

5/15/2009

11/15/2009

$

3,600

02262009

Parchment Community Center River Reach Development's main road sewer and water Sidewalk Replacement (City wide) 2 Sanitary Sewer Pump Station on-site generators Sanitary manhole replacement Park & Hubbard

s

O N

b u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

151 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

City of Parchment

Parchment

Iron sediment removal at backwash lagoons

Remove the iron sediments from within the backwash lagoon.

5/15/2009

11/15/2009

$

36,000

City of Parchment City of Parchment

Parchment Parchment

Lottie Ave. Water Main Generator at water Tower

11/15/2009 11/15/2009

$ $

42,000 60,000

City of Parchment

Parchment

Eunice Ave. Water Main

$

98,400

City of Parchment

Parchment

Haymac & Clarnin Water Main

500 LF of 12-inch main to extend Lottie Avenue to Eunice Avenue (expansion driven). 5/15/2009 Generator at water Tower 5/15/2009 1,200 LF of 12-inch water main to extend Eunice Avenue to “G” Avenue (expansion driven). 5/15/2009 2,100 LF of 12-inch main in Haymac and Clarnin from “G” Avenue to Parchmount (replacement). 5/15/2009

$

240,000

City of Parchment City of Parchment City of Parchment

Parchment Parchment Parchment

McKinley Water Main Solvel Water Main Lead Water Service Replacement

6,200 LF of 12-inch main in McKinley and Riverview Drive to Collingwood Avenue. Solvel Water Extension Lead Water Service Replacement

$ $ $

696,000 732,000 2,100,000

$

2,200,000 NA

T O

City of Plainwell

N s

5/15/2009 5/15/2009 5/15/2009

11/15/2009 11/15/2009

P P A

O R 11/15/2009 11/15/2009 11/15/2010

D VE

Due to the completion of the existing conditions analysis and concept design, the project could be ready to start construction by July 2009 ^January 2010

Plainwell, Michigan 49080 Plainwell Public Safety Building

Project would construct an 18,000 sq. ft. Public Safety Building to be located on the former Plainwell Paper site.

Plainwell, MI

Existing runway and taxiway pavements have deteriorated and are in need of reconstruction. Airport provides a valuable transportation link and is a vital part of the community; however it is ineligible for federal funds. Runway was originally paved in 1970. Existing navigational lighting aids along runway will be replaced with updated fixtures which will provide a safer more energy efficient system. This project has been on the 5 year plan since 2003. Project will create temporary construction jobs and preserve jobs that are currently tied to the airport. The continuing deterioration of this pavement will soon begin to limit operations and cause people to relocate to another area. 5/1/2009

t s e

City of Plainwell

R d

Runway Reconstruction

City of Pleasant Ridge Pleasant Ridge

Elm Park Water Main Replacement

City of Pleasant Ridge Pleasant Ridge

Elm Park Reconstruction

City of Pleasant Ridge Pleasant Ridge

Fairwood Reconstruction

u S City of Plymouth

City of Plymouth

02262009

e t t

it

bm

u q e

Redevelopment of Central Middle School Athletic Fields

The replacement of the Water main on Elm Park Blvd. 5/1/2009 The removal and replacement of Elm Park Blvd Concrete. Portions of the sewer will be repaired as needed. 5/1/2009 The removal and replacement of Fairwood Ave.Concrete. Portions of the sewer will be repaired as needed. 5/1/2009

8/1/2009

$

920,000 Rwy 9/27

9/1/2009

$

210,000

9/1/2009

$

375,000

9/1/2009

$

390,000

This Project is based on a partnership between the City of Plymouth and the Plymouth Canton School District to complete significant upgrades to the athletic fields at the Central Middle School facility in Plymouth. Both agencies share use of these fields and thus desire to combine available matching funds to complete the improvements. Planned improvements would include (1) ADA accessible bleachers, (2) ADA accessible bathroom facilities, (3) LED/Energy Efficient lighting upgrades for the primary fields, (4) solar energy powered lighting along walkable routes throughout the athletic complex, (5) synthetic athletic turf to save both water and the electricity required to run sprinkler systems, reduce pesticides and fertilizer use and reduce maintenance costs to create a "green field", and (6) a full field turf practice field.

Submitted Requests - Not Approved

152 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Plymouth

City of Plymouth

Project Name

Project Description

Expected Completion Date

Start Date

Tonquish Creek Flood Reduction and Storm Water Management

Flows in the Tonquish Creek have increased from 350 cubic feet per second to nearly 3 times that amount over the past 35 years. The Tonquish Creek flows through the TBD, pending City of Plymouth in an enclosed 84" elliptical tube that is drastically undersized. funding Localized flooding occurs along the Creek during large rain events. This project will availability, construct improvements (water quality devices, detention areas, additional storm project can be sewer for conveyance, etc...) to minimize local flooding and improve water quality to obligated in 120 safely allow the storm water to pass through the City. days

Tonquish Creek Flood Reduction and Storm Water Management

Flows in the Tonquish Creek have increased from 350 cubic feet per second to nearly 3 times that amount over the past 35 years. The Tonquish Creek flows through the TBD, pending City of Plymouth in an enclosed 84" elliptical tube that is drastically undersized. funding Localized flooding occurs along the Creek during large rain events. This project will availability, construct improvements (water quality devices, detention areas, additional storm project can be sewer for conveyance, etc...) to minimize local flooding and improve water quality to obligated in 120 safely allow the storm water to pass through the City. days

Cultural Center Energy Efficiency Improvements

The Plymouth Cultural Center is a public building that serves many uses including a full size ice skating rink, community rooms, an auditorium, kitchen, and the City's recreation department. The Cultural Center is identified as an emergency shelter for the community. The project consists of: (1) upgrading the 40 year old compressors, chillers and ice making equipment that support the ice rink activities with modern energy efficient models, (2) updating the building's HVAC systems to improve energy efficiency (i.e replace old boilers with new high efficiency boilers, replace/improve HVAC control systems), (3) provide a back up power source in the form of a gas generator to run the facilities critical systems (i.e. lighting, heat, etc..) in times where electricity is lost, (4) add insulation to the roof to help reflect the cold air down to the ice areas, and (5) updating the building's plumbing systems to save energy and water consumption (i.e. replace old domestic hot water heaters with new more efficient heaters, replace aging plumbing fixtures with sensor operated/low flow fixtures, etc..) 7/1/2009

O R

City of Plymouth

City of Plymouth

T O

Funding Request

Route (Infrastructure Only)

D VE

P P A

$

1,500,000

$

2,000,000

$

1,500,000

N s

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

02262009

it

qu

e R

12/1/2009

Upgrade 3 intersections in downtown Plymouth including (1) new LED traffic signals on new mast arms, (2) ADA ramp improvements to improve pedestrian accessibility at each intersection and (3) technology improvements isuch as countdown pedestrian signals to increase safety and reduce pedestrian/vehicle conflicts, which improves the overall efficiency of the roadway network.

Traffic Signal & Intersection Upgrades

TBD, pending Upgrade 3 intersections in downtown Plymouth including (1) new LED traffic signals funding on new mast arms, (2) ADA ramp improvements to improve pedestrian accessibility availability, at each intersection and (3) technology improvements isuch as countdown pedestrian project can be signals to increase safety and reduce pedestrian/vehicle conflicts, which improves the obligated in 120 overall efficiency of the roadway network. days

Massey Field Upgrades

TBD, pending funding availability, project can be obligated in 120 Add ADA accessible walking routes and bathrooms around the baseball field, add new energy efficient lighting to minimize the nighttime glare into adjacent properties. days

m b u

S

City of Plymouth

d e tt

Traffic Signal & Intersection Upgrades

t s e

Submitted Requests - Not Approved

Construction Complete by Summer 2010

$

(1) Ann Arbor Trail and Main Street, (2) Ann Arbor Trail and Harvey, and (3) Main Street and 600,000 Penniman

$

(1) Ann Arbor Trail and Main Street, (2) Ann Arbor Trail and Harvey, and (3) Main Street and 600,000 Penniman

$

350,000

153 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

City of Plymouth

02262009

Start Date

Funding Request

2009 Infrastructure Improvement Program

2009 Infrastructure Improvement Program

The 2009 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase Construction pedestrian and bicycle safety along the public road network. ADA compliant sidewalk anticipated to ramps will be constructed at each intersection. start June 1, 2009

2010 Infrastructure Improvement Program

The 2010 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase pedestrian and bicycle safety along the public road network. ADA compliant sidewalk ramps will be constructed at each intersection.

Holbrook, Hartsough, Burroughs and Irvin

2011 Infrastructure Improvement Program

The 2011 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase pedestrian and bicycle safety along the public road network. ADA compliant sidewalk ramps will be constructed at each intersection.

Dewey, Byron, and Simpson

d e tt

O R

T O

Construction Completion anticipated by Oct 15, 2009

N s

st

e u

q e R

P P A

D VE

The 2012 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase pedestrian and bicycle safety along the public road network. ADA compliant sidewalk ramps will be constructed at each intersection.

Adams, Maple, Park Place and Evergreen

Adams, Maple, Park Place and Evergreen

Harvey, Roosevelt, Harding, Linden and Sutherland

2010 Infrastructure Improvement Program

The 2010 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase Construction pedestrian and bicycle safety along the public road network. ADA compliant sidewalk anticipated to ramps will be constructed at each intersection. start June 1, 2010

Construction Completion anticipated by Oct 15, 2010

Holbrook, Hartsough, Burroughs and Irvin

2011 Infrastructure Improvement Program

The 2011 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase Construction pedestrian and bicycle safety along the public road network. ADA compliant sidewalk anticipated to ramps will be constructed at each intersection. start June 1, 2011

Construction Completion anticipated by Oct 15, 2011

Dewey, Byron, and Simpson

it

m b u

S

Project Description

Route (Infrastructure Only)

The 2009 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase pedestrian and bicycle safety along the public road network. ADA compliant sidewalk ramps will be constructed at each intersection.

2012 Infrastructure Improvement Program

City of Plymouth

City of Plymouth

Project Name

Expected Completion Date

Submitted Requests - Not Approved

154 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Plymouth

City of Plymouth

City of Pontiac

City of Plymouth

City of Plymouth

Pontiac

Project Name

Project Description

Start Date

2012 Infrastructure Improvement Program

Economic Development Assistance

This project involves the creation of technical assistance programs for businesses in the downtown and old Village commercial districts of the City of Plymouth. These programs would include the colaboration, cooperation and participation of the City, the Downtown Development Authority and the Chamber of Commerce to provide assistance to local businesses in areas of financial management, cooperative marketing, sharing of resources, business development and job creation.

DPW & U Facility

Design and construction of a new DPW&U Facility. The current facility is extremely dated and requires a significant amount of maintenance and repair. New Building would be LEEDS certified and contain up to date, proven environmental additions to make the building as "Green" as possible.

10/9/2009

10/11/2009

$

15,000,000 N/A

10/11/2009

$

15,000,000 N/A

11/9/2009

9/11/2009

$

15,000,000 N/A

6/9/2009

9/9/2009

$

300,000 N/A

9/9/2009

7/10/2009

$

10,000,000 N/A

5/9/2009

10/10/2009

$

5,000,000 N/A

7/9/2009 10/9/2009 10/9/2009 11/9/2009

9/10/2009 11/10/2009 6/10/2009 9/10/2009

$ $ $ $

15,000,000 1,000,000 250,000 5,000,000

9/9/2009

7/10/2009

$

July, 2009 3/9/2009 5/10/2009

7/10/2009 3/10/2009 2/11/2009

$ $ $

250,000 N/A Woodward Avenue 50,000,000 (M-10) 160,000 N/A 5,000,000 N/A

T O

P P A

Pontiac

Civic Center (City Hall, Police, and Court)

City of Pontiac

Pontiac

WWTP Expansion

Expansion to the wastewater treatment plant to allow the City to more effectively collect and treat wastewater from Pontiac and surrounding communities.

Pontiac

Replacement of the #1,2 primary and final clarifiers with 10 state standard tanks, at the Auburn plant

Replacement of the #1,2 primary and final clarifiers with 10 state standard tanks, at the Auburn plant

Pontiac

Central Fire Station

City of Pontiac

Pontiac

Smart Zone

City of Pontiac City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac Pontiac

City of Pontiac

Pontiac

Marina Purchase WHRC Building Adaptive Reuse Environmental remediation 50th District Court/Community Development Stimulus Project

City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac

City of Pontiac

Pontiac

City of Pontiac

Pontiac

02262009

tt i m

d e t

ub

e u

q e R

City of Pontiac

s t s

-N

Design and construction of a new central fire station and training facility. The current station was built in 1961 and has no training facilities. The department has outgrown this station. The newest Ladder Truck will not fit through the doors. Establishment of High density & high technology office/ user space along State Trunkline etween two medical anchor institutions Dredge connection between Mill pond and all sports lake to give Pontiac residents access to water sports. Create a community banquet facility. Retrofit building for City Offices or Community Center Adaptive Reuse of all vacant school buildings vacant brownfield sites such a Skandia and Kennett Road Landfi Major foundation, wall, electrical, plubming, roof, ventilation, roof, and ceiling repair throughout courthouse

D VE

Construction Completion anticipated by Oct 15, 2012

O R

City of Pontiac

S

Funding Request

Route (Infrastructure Only)

The 2012 Infrastructure Improvement program includes the reconstruction of streets, water main, sanitary sewer, storm sewer and sidewalk in residential neighborhoods to increase water transmission, eliminate utility deficiencies, reduce inflow and infiltration reduce water loss and main breaks, reduce roadway maintenance and increase Construction pedestrian and bicycle safety along the public road network. ADA compliant sidewalk anticipated to ramps will be constructed at each intersection. start June 1, 2012

Design and construction of a new Civic Center. The current facilities are stand only buildings, they are extremely dated and require a significant amount of maintenance and repair. New Building would be LEEDS certified and contain up to date, proven environmental additions to make the building as "Green" as possible. 10/9/2009

City of Pontiac

Expected Completion Date

Harvey, Roosevelt, Harding, Linden and Sutherland

N/A N/A N/A N/A

Daylighting of Clinton River volt Central Community Center

Uncover original waterway and create greeen spcace and development potential Purchase of 4 electric GM Volts for fleet pool cars Design and construction of a central Community Center

Water Main Upgrade (Looping in Isolated Areas)

Installation new 8" and 12" water mains for improved system reliability and efficiency, and pressures on dead-end and isolated areas of the City water systems 9/9/2009

9/11/2009

$

3,620,000 City Wide

Water Main Upgrade from 6" to 8" Pipe

Installation and replacement of existing aged 4" water mains (many which are 60+ years old) with new 8" mains for improved system reliability and efficiency, and pressures

9/12/2009

$

19,100,000 City Wide

Submitted Requests - Not Approved

9/9/2009

155 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Pontiac

Project Name

Project Description

Start Date

Expected Completion Date

Installation and replacement of existing aged 4" water mains (many which are 60+ years old) with new 8" mains for improved system reliability and efficiency, and pressures

Pontiac

Water Main Upgrade from 4" to 8" Pipe

9/9/2009

9/12/2009

City of Pontiac

Pontiac

9/11/2009

City of Pontiac

Pontiac

Installation and replacement of existing aged 6" & 8" water mains (many which are 60+ years old) with new 12" mains for improved system reliability and efficiency, and Water Main Upgrade, Installation of 12" Main pressures 9/9/2009 Rehabilitation and replacement of pumps, motors, electrical controls, and structural Lift Station Repairs/Reconstruction improvements to 13 sanitary lift stations 9/9/2009

City of Pontiac

Pontiac

Sanitary Sewer Repairs

Point repairs to various sanitary sewers to removal inflow and infiltration, through the use of grouting of various joints within the sanitary sewer pipes 5/9/2009 Repairs to roof, boiler, minor structural work to building, doors and windows within water & sewer administration and water pumping station building, including security measures 9/9/2009 Repairs to roof, heating unit, concrete flooring, and minor structural repairs, including security measures 9/9/2009 Convert Woodward Avenue to 2-way traffic. Renovation of subject HVAC Sysyem Demolition & Construction of Restroom Facilities at City Parks

City of Pontiac

Pontiac

City of Pontiac

Pontiac

Capital Repairs Water and Sewer Maintenance Building Water and Sewer Maintenance Building Facilities

City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac

Woodward Avenue Police Station HVAC Renovations Park Facilities

City of Pontiac City of Pontiac

Pontiac Pontiac

Rehabilitation of Existing Community Centers Rehabilitation of Existing Community Center Buildings through out the City Green or energy effcient Roofs City Hall, DPW, Police Building, and Fire station

s

Construction of pedestrian bridge over Telegraph Road for the Clinton River Trail. The structure will connect the existing trail in Sylvan Lake with the existing trail in Pontiac. Demolish Silverdome and prepare the site for redevelopment Replacement of street signs along major and local roads. Existing signs will be out of compliance with federal regulations by 2012. Total Removal and Replacement Total Removal and Replacement

t s e

City of Pontiac City of Pontiac

Pontiac Pontiac

Clinton River Trail Pedestrian Bridge Demolition of Silverdome

City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac

Street Sign Replacement City Hall Roof Police Station Roof

City of Pontiac

Pontiac

Demolition of Hayes Jones Center and Pool

City of Pontiac

Pontiac

Weed Abatement

City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac

Park Clean Up and Maintenance Tree Planting Tree Removal

City of Pontiac City of Pontiac City of Pontiac City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac Pontiac Pontiac Pontiac

City of Pontiac

Pontiac

City of Pontiac

Pontiac

SCADA Upgrade Project Driveway Resurfacing Tank Concrete Repairs Roof Repair Incenerator ID Fan New Pump for East Bound Plant Modernize and update the Electrical systems at the auburn and E.B. plants Modernize and update the Electrical systems at the auburn and E.B. plants Security systems for both the Auburn and E.B. plants Security systems for both the Auburn and E.B. plants

City of Pontiac City of Pontiac

Pontiac Pontiac

02262009

b u S

Submitted Requests - Not Approved

D VE $

3,620,000 City Wide

$

5,000,000 N/A

$

2,500,000 City Wide

9/10/2009

$

5/10/2009 9/9/2009 9/9/2009

9/11/2009 11/9/2009 9/10/2009

$ $ $

8/9/2009 9/9/2009

9/10/2009 7/10/2009

$ $

5,000,000 N/A 600,000 N/A

7/9/2009 3/9/2009

7/10/2009 10/9/2009

$ $

Telegraph Road 2,500,000 (US-24) 5,000,000 N/A

6/9/2009 July, 2009 July, 2009

11/9/2009 9/9/2009 9/9/2009

$ $ $

8/9/2009

$

80,000 N/A

10/9/2009

$

200,000 N/A

10/9/2009 11/9/2009 11/9/2009

$ $ $

170,000 N/A 300,000 N/A 300,000 N/A

9/9/2009 8/9/2009 8/9/2009 8/9/2009 6/9/2009 6/9/2009

$ $ $ $ $ $

350,000 350,000 300,000 200,000 60,000 80,000

5/9/2009

9/9/2009

$

700,000 N/A

4/9/2009

7/9/2009

$

100,000 N/A

5/9/2009 4/9/2009

8/9/2009 7/9/2009

$ $

500,000 N/A 200,000 N/A

Total demolition of subject structure July, 2009 Purchase of 2 tractors with mowing attachements and hiring of seasonal employees to maintain vacant lots 5/9/2009 Hiring of seasonal staff for spring clean up and summer maintenance in parks including vehciles and small equipment 5/9/2009 City wide tree planting 5/9/2009 Removal of Blighted and unsafe trees City wide 5/9/2009 Connection between the Auburn Road Plant and the East Boulevard Plant as well as equipment and operation to centeral computer. July, 2009 Repaving of both the Auburn Road and Rast Boulevard Driveways 5/9/2009 Concrete Repair of Tanks and Buildings at both the Auburn and E.B. plants 4/9/2009 Replacement of roofs on buildings at both plants. Eight Buildings 4/9/2009 New Induced Draft Fan for incenerator 5/9/2009 New Cationic pump system for the E.B. plant 4/9/2009

(1) new digested Sludge Heat Exchanger for the Auburn plant and (2) new digested Sludge (1) new digested Sludge Heat Exchanger for the Auburn plant and (2) new digested Heat Exchangers for the E.B. plant Sludge Heat Exchangers for the E.B. plant Laboratory Modernization New equipment for the laboratory

1,520,000 City Wide

$

R d

e t tt

i m

u q e

PP

O R 9/9/2009

$

9/10/2009

A T

O N

5/10/2009

Funding Request

Route (Infrastructure Only)

500,000 N/A 2,500,000 N/A Woodward Avenue 10,000,000 (M-10) 100,000 N/A 500,000 N/A

300,000 City Wide 200,000 N/A 200,000 N/A

N/A N/A N/A N/A N/A N/A

156 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Pontiac Pontiac City of Pontiac Pontiac City of Pontiac Pontiac City of Pontiac Pontiac

Project Name New Engines for Blowers Scrubber and Ash Lagoon New Fencing Drive Units for Clarifires

City of Pontiac

Pontiac

SCADA System

City of Pontiac

Pontiac

Upgrades to Water Pumping Station

City of Pontiac

Pontiac

SCADA System (Lift Stations

City of Pontiac

Pontiac

Sanitary Sewer Manhole Repairs

City of Pontiac

Pontiac

Sanitary Sewer Lining

City of Pontiac

Pontiac

Fire Station #1 Parking Lot Paving

City of Pontiac

Pontiac

Fire Station #2 Parking Lot Paving

Remove and repave parking lot, rear deck and driveway. 23,000 Square feet. 5/9/2009 Remove and repave parking lot, rear deck, front deck and driveways. 13,000 square feet. 5/9/2009

City of Pontiac

Pontiac

Fire Station #5 Parking Lot Paving

Remove and repave parking lot, rear deck and front deck. 6,000 square feet.

City of Pontiac City of Pontiac

Pontiac Pontiac

Job Training Strand Theater

Provide Firefighter, EMT and Paramedic training for new and current employees. Restoration of historic theater

Project Description (2) new gas Engines for Blowers Scrubber and Ash Lagoon New fence line around both plants (4) new Drive Units for final clarifiers at the E.B. plant Installation of a SCADA system for the monitoring and control the City water pumping station, elevated tanks and pressure areas Replacement and rehabilitation of the pumps, motors, and electrical controls to the city water pumping station, including minor structural repairs

Start Date 6/9/2009 6/9/2009 5/9/2009 5/9/2009

$ $ $ $

5/9/2009

5/10/2009

$

200,000 N/A

5/9/2009

12/11/2009

$

1,300,000 N/A

$

500,000 N/A

9/9/2009

$

650,000 City Wide

9/9/2009

$

1,500,000 City Wide

6/9/2009

$

50,000 N/A

6/9/2009

$

75,000 N/A

5/9/2009

6/9/2009

$

50,000 N/A

4/9/2009 5/9/2009

Ongoing 11/9/2009

$ $

250,000 N/A 3,000,000 N/A

6/9/2009

$

300,000 N/A

Installation of a SCADA system for the monitoring and control of the 14 lift stations operated and maintained by the City, with alarms and system controls 5/9/2009 Rehabilitation of Sanitary Sewer manholes to remove inflow and infiltration, and structural deficiencies 5/9/2009 Rehabilitation of existing sanitary sewers to removal inflow and infiltration, through the use of full pipe lining systems 5/9/2009

T O

s t s

-N

Route (Infrastructure Only) N/A N/A N/A N/A

Expected Completion Date 8/9/2009 9/9/2009 8/9/2009 6/9/2009

P P A

O R 5/10/2009

Funding Request 650,000 700,000 250,000 250,000

D VE

City of Pontiac

Pontiac

Bear Cat

Bear Cat tactical armored response vechile -Designed for special operations within law enforcement has proven itself against attackes from assault wepons and provided SWAT teams with unprecedented balistic protection. It also alows teams fo perform critical response and resuce operations wth speed mobiltiy and safety. 3/9/2009

City of Pontiac

Pontiac

Alt fuel Bio-Diesel/E -85 Dispensing system

Replaced 25 year old fuel tanks with modern tanks for use of Bio deisel 20 and E-10 or E 85 fuels with up to date leak detection and secondary containment 3/9/2009

6/9/2009

$

100,000 N/A

Eliminate idle time of diesel and gas engines. Autotherm units provide heat for up to 4 hours from existing engine heat. Also cools vehcile when hot by cirulation of air in vehcile. 3/9/2009

6/9/2009

$

18,000 N/A

Modernize/Downsize and Re-organize fleet operations DPW,Water,Sewer and Police Standardize Fleet and Equipment Alternative Fuel Program/Bio-Diesel Lower emissions and become DOE compliant Combine garages and stockrooms under one fleet management system CCG FASTER program 3/9/2009

8/9/2009

$

5,200,000 N/A

ASTRO 25 uses project 25 standards that is used by most public safety agencies in the state of michigan.Astro 25 uses the project 25 standards and has flexiblity and modularity built in allowig future growth and innovation . P25 common air interface is a standard that specifies the type of digital signal transmitted by a compliant radio. This proposed radio system will allow the city of Pontiac first resoponders to have direct interroperability between various deparments within the city of pontiac as weel as surronding counties and the state of michigan. 3/9/2009

6/9/2009

$

3,000,000 N/A

Community Gardens on vacant City owned property purchase CN Railroad property for bike path purchase vacant lots in signature area for future developmen

4/9/2009 5/9/2009 5/9/2009

10/9/2009 6/9/2009 11/9/2009

$ $ $

250,000 N/A 2,000,000 N/A 500,000 N/A

Paving/resurfacing of courthouse parking lot.

7/9/2009

9/9/2009

$

60,000 N/A

Irrigation system

6/9/2009

7/9/2009

$

10,000 N/A

City of Pontiac

City of Pontiac

Pontiac

Pontiac

City of Pontiac

Pontiac

City of Pontiac City of Pontiac City of Pontiac

Pontiac Pontiac Pontiac

City of Pontiac

Pontiac

City of Pontiac

Pontiac

02262009

e t tt

i m

b u S

eq

R d

Autotherm

Fleet Reoganization plan

e u

Project 25 voice and data soluitions for the police fire and dpw&u for the city of pontiac Community Gardens/sustainable urban agriculture program Acqusition and const.of bike paths Acquisition of vacant lots 50th District Court/Community Development Stimulus Project 50th District Court/Community Development Stimulus Project

Submitted Requests - Not Approved

157 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Pontiac

Pontiac

City of Pontiac

Pontiac

Project Description

Start Date

As-Needed Services and maintenance of existing GIS database. Field work to locate City owned assets (storm sewer, water main, sanitary sewer , street lights, traffic Geographic Information System (GIS) Project signals etc.) 3/9/2009

Pontiac

City of Pontiac

Project Name

City would hire a consultant or coordinate with County. This testing is mandated as part of the MDEQ outfall permit but is an unfunded mandate. Due to budget constraints, the City does the minimum acceptable. Funding for this would give the Outfall Testing and other permit complaince City to opportunity to do a thorough job with testing outfalls and increasing public activities. awarness. Fire Station #4 Parking Lot Paving and Storm Remove existing concrete; install storm sewers; cement rear deck, parking lot and Sewer Installation driveway

Pontiac

Ongoing

O R

5/9/2009

6/9/2009

Oakland Drive

Reconstruction of major streets that have maximized life cycle. West Milham serves as primary detour route for I-94 and will be particularly important for maintaining regional traffic flow during the upcoming widening of I-94. Specifically, West Milham contains the nearest I-94 interchange to the South Westnedge interchange, which will be under construction and out of service for periods of time as discussed in Project 1. This interchange will handle a significant portion of the 40,000 to 60,000 vehicles that utilize South Westnedge Avenue. Construction requires some sub-base rehabilitation and new pavement. Additionally, neccesary repairs to curb and gutter/paved shoulders and storm drainage will also be identified within project limits.

City of Portage

City of Portage

City of Portage

City of Portage

City of Portage

City of Portage

-N

Milham Road

Improve safety and traffic flow on West Milham Avenue from Angling Road to 12th Street. West Milham serves as primary detour route for I-94 (1st major street south of I-94 running parrelel) and will be particularly important for maintaining regional traffic flow during the upcoming widening of I-94 as discussed in Project 1. Project will include widening the existing roadway and adding an optional center turn lane. Additional components include curbs and gutters, bike lanes, sidewallk, storm drainage and sanitary sewer enhacements.

I-94 Widening Project

Ongoing MDOT project that widens I-94 to six lanes. The project, based on discussions with MDOT officials, is being included in MDOT stimulus requests. The project includes approximaately $2,500,000 worth of construction costs that were to be the City of Portage's share of the project. The $62,500,000 total project costs includes the $2,500,000 Portage share.

b u S

City of Portage

City of Portage

02262009

R d

e t tt

i m

Kilgore Road

Submitted Requests - Not Approved

100,000 N/A

D VE $

100,000 N/A

$

220,000 N/A

11/9/2009

$

e u

eq

Route (Infrastructure Only)

P P A

Bloomfield Park

s t s

Funding Request

$

3/9/2009

This infrastructure project, which will be dedicated to the City of Pontiac upon completion, is made up of $2.7 M for roadways, curbs, sidewalks and parks, $1.4 M for street lights, $1.6 M for utilities, $400 K for traffic signals and $6 M for parking garages, totaling $12.1 M. This infrastructure, along with $75.5 M of recently installed infrastructure are to be an intregral component of the Bloomfield Park Phase I project, which suspended construction in the fall of 2008 due to the global economic conditions.The Bloomfield Park - Phase I project is a 34 acre mixed use development scheduled to include 420,000 square feet of retail space, 123,000 square feet of office space and 139,000 square feet of residential space. This walkable, dense mixed use development will provide for shopping, dining, living, working and playing unlike any other new construction project development in southeast Michigan.The project is located along a traditional commercial corridor in a Qualified Local Unit of Government. Pontiac is designated as a City of Promise. 5/9/2009

T O

City of Pontiac

Expected Completion Date

$

Adjacent to Telegraph Road 378,000,000 (US-24)

Oakland Drive from the I-94 interchange to 250,000 Kilgore Road

$

Kilgore Road from South Westnedge Avenue to Lovers 1,400,000 Lane

$

Milham Avenue from Angling Road 4,800,000 to 12th St.

$

I-94 from approximately Oakland Drive to 62,500,000 Portage Road

158 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Portage

City of Richmond

City of Riverview

Project Name

Project Description

Start Date

Expected Completion Date

City of Portage

Reconstruction of major streets that have maximized life cycle. Romence Road is a major thoroughfare that serves the regional mall (The Crossroads), the South Westnedge Retail Corridor and Pfizer's largest manufacturing facility in the world. Construction requires some sub-base rehabilitation and new pavement. Additionally, neccesary repairs to curb and gutter/paved shoulders and storm drainage will also be Major Street Reconstruction - Romence Road identified within project limits.

City of Richmond, Macomb County

City of Riverview

Division Road Improvements

1. Reconstruct the sanitary sewer from Forest Street, North of M-19, to Division Road and then East on Division Road to the pump station on Division Road at Skinner Drive and then to the Railroad in order to eliminate I/I sources per the MDEQ Consent Agreement.. 2. Reconstruction the water main on Forest Street from M-19 to Division Road to meet the current 10 States Standards. 3. Reconstruct Forest Street from M19 to Division Road. 4. Re-construction/Upgrade of the Division Road Pump Station per the MDEQ Consent Agreement and to meet 10 States Standards.

Marsha Road water main replacement

Project consists of the removal and replacement of the existing water main between Mattews and Valade with an 8" water main including hydrants, valves and appurtenances.

T O

O R

P P A

Funding Request

D VE $

Romence Road from Sprinkle Road to Constitution 1,000,000 Drive

$

2,250,000

5/1/2009

11/1/2009

$

400,000

5/1/2009

11/1/2009

$

430,000

City of Riverview

City of Riverview

Dundee Road water main replacement

City of Riverview

City of Riverview

Marsha Road reconstruction

Project consists of the removal and replacement of the existing water main between Devonshire and Berkshire with an 8" water main including hydrants, valves and appurtenances. Project consists of the removal and reconstruction of pavement including new base, subdrains new concrete etc. between Mattews and Valade

5/1/2009

11/1/2009

$

572,000

Hinton Road water main replacement

Project consists of the removal and replacement of the existing water main between Sibley and Longsdorf with an 8" water main including hydrants, valves and appurtenances.

5/1/2009

11/1/2009

$

582,000

5/1/2009

11/1/2009

$

582,000

5/1/2009

11/1/2009

$

587,000

5/1/2009

11/1/2009

$

610,000

5/1/2009

11/1/2009

$

798,000

5/1/2009

11/1/2009

$

798,000

5/1/2009

11/1/2009

$

843,000

5/1/2009

11/1/2009

$

905,000

5/1/2009

11/1/2009

$

2,500,000

5/1/2009

11/1/2009

$

2,950,000

$

2,208,125

$

1,500,000

Summer/Fall 2009 $ $

90,000 270,000

City of Riverview

City of Riverview

s t s

-N

City of Riverview

City of Riverview

Koester Road water main replacement

Project consists of the removal and replacement of the existing water main between Sibley and Longsdorf with an 8" water main including hydrants, valves and appurtenances.

City of Riverview

City of Riverview

Dundee Road reconstruction

Project consists of the removal and reconstruction of pavement including new base, subdrains, new concrete etc. between Devonshire and Berkshire

City of Riverview

Mattews Road water main replacement

City of Riverview

City of Riverview

Hinton Road reconstruction

City of Riverview

City of Riverview

Koester Road reconstruction

City of Riverview

City of Riverview

Mattews Road reconstruction

e t tt

ub

City of Riverview

City of Riverview

City of Riverview

City of Riverview

City of Riverview

City of Riverview

City of Rochester

City of Rochester

Meadow Lane Area Infrastructure

City of Rochester

City of Rochester

Downtown Lighting Upgrade

City of Rochester City of Rochester

S

City of Rochester City of Rochester

02262009

Quarry Road water main replacement

Riverfront Enhancement Quarry Road reconstruction

City Hall Emergency Generator Charles/Wiliams St. Infrastructure

eq

Project consists of the removal and replacement of the existing water main between Valade and Valade with an 8" water main including hydrants, valves and appurtenances. Project consists of the removal and reconstruction of pavement including new base, subdrains, new concrete etc. between Sibley and Longsdorf Project consists of the removal and reconstruction of pavement including new base, subdrains, new concrete etc. between Sibley and Longsdorf Project consists of theremoval and reconstruction of pavement including new base, subdrains new concrete etc. between Valade and Valade

R d

City of Riverview

i m

e u

Project consists of the removal and replacement of the existing water main between Sibley and Pennsylvania with a 12" water main including hydrants, valves and appurtenances. Project consists of the installation of sheet piling, railings, brick pavers and the construction of a gazebo at the riverfront. Project consists of theremoval and reconstruction of pavement including new base, subdrains new concrete etc. between Sibley and Pennsylvania Reconstruct existing roadways and replace failing water, sewer and storm sewer infrastructure. Replace 365 metal halide light fixtures and poles that are 20 years old with energy efficient induction lighting. Purchase and install emergency generator at City Hall. Reconstruct existing roadways and replace failing clay sanitary pipe

Submitted Requests - Not Approved

Summer/Fall 2009

Route (Infrastructure Only)

159 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Rochester

City of Rochester

Paint Creek Trail Bridge

City of Rochester City of Rochester

City of Rochester City of Rochester

Elizibeth Area Sewer Interceptor Parkdale Safety Improvements

City of Rochester

City of Rochester

Ferndale Area Infrastructure

Project Description Replace wood brige along the Paint Creek Trail which has deteriorated. The new bridge would be able to support emergency vehicles. Reconstructs existing roadway and replaces a main sanitary sewer interceptor which is failing. Make several safety improvements to Parkdale Road Reconstruct existing roadways and replace failing water, sewer and storm sewer infrastructure.

Water Storage Facility

Construction of a water storage facility to provide adequate water pressure to the north and east-central areas of the City of Rochester Hills, as well as to potentially reduce peak hour charges from DWSD.

Crooks Road Interchange Reconstruction

Complete reconstruction of the existing interchange owned by the Michigan Department of Transportation to a boulevard crossing of M-59 including reconstruction of all ramps to and from M-59 8/1/2009

City of Rochester Hills, City of Rochester Hills Michigan

City of Rochester Hills Rochester Hills

City of Rochester Hills Rochester Hills

City of Rochester Hills City of Rogers City City of Rogers City City of Rogers City City of Rogers City City of Rogers City

City of Saginaw

City of Saginaw

City of Saginaw

Project Name

Rochester Hills Rogers City Rogers City Rogers City Rogers City Rogers City

Crooks Road Reconstruction

M-59 Widening between Crooks and Ryan

T O

Complete reconstruction of the existing two-lane roadway owned by the Road Commission for Oakland County to a four-lane boulevard section

s t s

Start Date

O R

6/10/2009

P P A 8/1/2009

6/11/2009

11/1/2010

11/1/2010

Funding Request $

300,000

$ $

470,000 530,000

$

2,100,000

D VE

e u

11/1/2010

10,000,000 NA

$

24,000,000 at M-59

$

Hamlin Road Intersection and south to the existing boulevard section south of M8,000,000 59

$ $ $ $ $ $

Hamlin Road Intersection and south to the existing boulevard section south of M60,000,000 59 120,000 1,500,000 2,000,000 2,500,000 5,000,000

$

City of Saginaw Wastewater 2,000,000 Treatment Plant

10/1/2010

$

City of Saginaw Wastewater 15,000,000 Treatment Plant

8/1/2010

$

over Veterans 1,300,000 Memorial Parkway

Reconstruction of .3 miles of two lane roadway with two parking lanes to include removal and replacement of existing roadway with asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc Hamilton Street reconstruction including water along with related items of work. Upgrade of existing street light system to new and sewer replacement decorative street lights and decorative stamped sidewalk. 3/1/2011

8/1/2011

$

Lyon Street to 3,000,000 Court Street

Reconstruction of 0.65 miles of five lane roadway to include removal and replacement of existing roadway with asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc. along with related items of work. 3/1/2011

9/1/2011

$

Fraser Street to 4,500,000 Joslin Street

Saginaw

Aerator replacement at the Wastewater treatment plant

Saginaw

Environmentally friendly green project, Biosolids to energy (digestors and power generators)

Saginaw

Reconstruction/redecking of this bridge that was built in 1971. Existing bridge has Norman Street Bridge over Veterans deteriorated and is in need of a redecking/reconstruction. The existing bridge consists Memorial Parkway Reconstruction/Redecking of two span, 114 feet long steel structure with a composite deck. 4/1/2010

tt i m

d e t

Aerator replacement at the Wastewater treatment plant Environmentally friendly green project, Bio-solids to energy (digestors and power generators)

5/1/2009

4/1/2010

7/1/2009

ub

City of Saginaw

City of Saginaw

Saginaw

Saginaw

02262009

S

Route (Infrastructure Only)

$

-N

Addition of a third thru-lane along M-59 to eliminate the existing chokepoint between Crooks and Ryan Roads 8/1/2009 Water Main expansion and replacement Grambau Center historic building renovation Water Main repair and looping Street Lighting Wastewater Treatment Plant improvement

q e R

Expected Completion Date

Michigan Avenue reconstruction including water and sewer replacement

Submitted Requests - Not Approved

160 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

Project Name

Project Description

Start Date

Parallel Raw Water main installation

Installation of a 36" raw watermain from the City of Saginaw Water Treatment Plant to Hotchkiss Road to provide assurance that the City of Saginaw can continue to provide water should the existing raw water main fail. 4/1/2010

Saginaw

miscellaneous improvements to the City of Saginaw Wastewater Treatment Plant wastewater processing systems

Miscellaneous improvements to the City of Saginaw Wastewater Treatment Plant wastewater processing systems to include the following: Settling tank weir replacements - $150,000, Return activated sludge valves replacement - $150,000, Septage receiving station - $250,000, Sludge storage tank mixing replacement $250,000, final settling tank rate control valve replacement - $500,000 along with related items

Saginaw

Interim Improvements to disinfection system for Water Treatment Plant

Saginaw

Influent bar screen replacement at wastewater treatment plant Influent bar screen replacement at wastewater treatment plant

Saginaw

Saginaw

Interim Improvements to disinfection system for Water Treatment Plant

Final Settling tanks substructure replacement Final Settling tanks substructure replacement

Expected Completion Date

O R

7/1/2009

PP

5/1/2009

A T

O N

4/1/2011

6/1/2009

7/1/2009

4/1/2010

8/1/2009

9/1/2009

12/1/2009

Funding Request

$

Route (Infrastructure Only)

30,000,000 various roads

D VE $

City of Saginaw Wastewater 1,300,000 Treatment Plant

$

City of Saginaw Water Treatment 1,500,000 Plant

$

City of Saginaw Wastewater 1,500,000 Treatment Plant

$

City of Saginaw Wastewater 1,700,000 Treatment Plant City of Saginaw Wastewater 2,000,000 Treatment Plant

River crossing pipeline

Install additional Sanitary sewer from the Wastewater treatment plant beneath the Saginaw River going to the west.

4/1/2010

7/1/2010

$

Saginaw

Emergency diesel generator for water treatment plant pump stations

purchase emergency diesel generator for various water treatment pump stations to continue to provide water to various locations throughout Saginaw County during events that cause power failures.

3/1/2009

4/1/2009

$

200,000

Saginaw

Blast and paint Gratiot Road ground storage tank

$

Gratiot Road near Tittabawassee 200,000 River

Saginaw

Installation of membrane type coating on west clearwell at Water Treatment Plant Installation of membrane type coating on west clearwell at Water Treatment Plant

$

City of Saginaw Water Treatment 750,000 Plant

$

City of Saginaw Water Treatment 2,000,000 Plant

$

1315 South Washington Avenue, Saginaw 4,000,000 MI 48601

$

Bay Road from Court Street to 4,000,000 Weiss Street

Saginaw

e u

st

s

Blast and paint Gratiot Road ground storage tank

eq

7/1/2009

7/1/2009

8/1/2009

9/1/2009

R d

City of Saginaw

i m

security upgrades and improvements at the Water Treatment Plant

Saginaw

ub

Saginaw

Renovations and mechanical and plumbing upgrades to Saginaw City Hall to include but not be limited to removal of existing boiler and steam heat system with new roof mounted HVAV system and associated plumbing upgrades, new efficient window installations, new green roof to replace existing deteriorated roof, skylight over existing interior court system and all necessary internal improvements to make existing City hall more energy and people efficient. Proposed design was completed and bid in June of 2002, constructed has not taken place due to lack of funds. Project 4/1/2009 Saginaw City Hall Renovations and upgrades could be ready to bid within 30 to 90 days.

Saginaw

Replace existing 6" watermain with new 8" watermain

S City of Saginaw

City of Saginaw

e t tt

Security system shall consist of a chain link fence along the back side of the plant and infrared cameras in the front of the plant creating a virtual fence. Two thermal imaging cameras located at the front area of the plant and three thermal imaging cameras at the back of the plant. A card reader access system to eliminate keys and monitor access to the water plant facilities. In addition fencing, cameras, magnetic door locks and proximity card readers will be added to the remote stations. An Ethernet radio network and programmable logic controllers will be added to update monitoring between the Saginaw water treatment plant and the remote stations, along with many other security measures installed. 7/1/2009

02262009

replace existing 6" watermain and water services with new 8" watermain and water services and necessary road repairs to accommodate water main improvements

Submitted Requests - Not Approved

4/1/2010

4/1/2010

9/1/2009

9/1/2010

161 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

replace existing 6" and 30"watermain and water services with new watermain and water services and necessary road repairs to accommodate water main improvements

4/1/2010

9/1/2010

3/1/2011

9/1/2011

City of Saginaw

Saginaw

Replace existing 6" and 30"watermain with new watermain

City of Saginaw

Saginaw

Michigan Avenue resurfacing

Resurfacing to include cold milling and paving of 2.2 miles of five-lane roadway with HMA material and adjusting structures and isolated curb and gutter replacement

Re-line existing Twin 30" water mains

City of Saginaw recently spent over $600,000 to make improvements to the existing twin 30" watermains on the West side of the Saginaw River located between the River and Niagara Street. The existing cast iron/steel watermains that go from the Kidney Dialysis center on the west side of the river to Ojibway Island on the east side of the river are in need of relining or reconstruction. We believe that relining is a more economical solution to repair these deteriorating utilities. 7/1/2009

Woodbridge Street reconstruction including water and sewer replacement

Reconstruction of .5 miles of two lane roadway to include removal and replacement of existing two lane roadway with two lane asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc. along with related items of work. 4/1/2010

Court Street reconstruction including water and sewer replacement

Reconstruction of 1.0 miles of five lane roadway to include removal and replacement of existing roadway with asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc. along with related items of work. Upgrade of existing street light system to new decorative street lights and decorative stamped sidewalk in the block between Court Street Bridge and Michigan Avenue. 3/1/2011

City of Saginaw

City of Saginaw

City of Saginaw

Saginaw

Saginaw

Saginaw

Expected Completion Date

T O

N s

t s e

$

Sheridan Road from Hoyt Street to 5,600,000 Hess Street

D VE $

Stephens Street to 1,400,000 State Street

$

beneath Saginaw 2,000,000 River

8/1/2010

$

Houghton Avenue to Davenport 2,400,000 Avenue

9/1/2011

$

Court Street Bridge 6,500,000 to Bay Road

$

Catherine Street to 1,500,000 Houghton Avenue

$

Franklin Street to 6,500,000 Janes Avenue

O R

P P A

Funding Request

Route (Infrastructure Only)

8/1/2009

u q e

City of Saginaw

Saginaw

Reconstruction and Streetscape of Harrison Street to include .15 miles of removal and replacement of existing roadway with four lane boulevard concrete/asphalt pavement and curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Streetscape to include decorative sidewalks, decorative stamped ADA sidewalk ramps, decorative street lights, park benches, landscape areas, trees and tree grates, altogether with related items of work. This will finish the $2,000,000 plus dollar project that was constructed in 2004 on Houghton Boulevard from Harrison Street to Michigan Avenue. This project was designed in anticipation of construction in 2004. Lack of available funds to build this has put this project on hold. This project is designed and ready to be bid!

R d

e t tt

Harrison Street Reconstruction, water and sewer replacement and Streetscape

i m

City of Saginaw

Saginaw

02262009

Reconstruction and Streetscape of East Genesee Avenue to include .5 miles of removal and replacement of existing five lane roadway with five lane concrete pavement and curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Streetscape to include decorative sidewalks, decorative stamped ADA sidewalk ramps, decorative street lights, park benches, landscape areas, improvements to Jeffers Memorial Park area,, tree and tree grates, etc. Upgrade traffic signals and the intersections of Jefferson, Warren East Genesee Avenue Reconstruction, water and Janes with East Genesee Avenue to decorative mast arms with LED signals and and sewer replacement and Streetscape countdown pedestrian signals, altogether with related items of work. 3/1/2010

b u S

Submitted Requests - Not Approved

8/1/2010

162 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Saginaw

Reconstruction and Streetscape of East Genesee Avenue to include .5 miles of removal and replacement of existing five lane roadway with five lane concrete pavement and curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Streetscape to include decorative sidewalks, decorative stamped ADA sidewalk ramps, decorative street lights, park benches, landscape areas, improvements to Jeffers Memorial Park area,, tree and tree grates, etc. Upgrade traffic signals and the intersections of Jefferson, Warren East Genesee Avenue Reconstruction, water and Janes with East Genesee Avenue to decorative mast arms with LED signals and and sewer replacement and Streetscape countdown pedestrian signals, altogether with related items of work. 3/1/2010

City of Saginaw

Woodbridge Street reconstruction including water and sewer replacement

Reconstruction of .5 miles of two lane roadway to include removal and replacement of existing two lane roadway with two lane asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc. along with related items of work. 4/1/2010

O R

Funding Request

Route (Infrastructure Only)

D VE $

Franklin Street to 6,500,000 Janes Avenue

8/1/2010

$

Houghton Avenue to Davenport 2,400,000 Avenue

City of Saginaw

Reconstruction of .3 miles of two lane roadway with two parking lanes to include removal and replacement of existing roadway with asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc Hamilton Street reconstruction including water along with related items of work. Upgrade of existing street light system to new and sewer replacement decorative street lights and decorative stamped sidewalk. 3/1/2011

8/1/2011

$

Lyon Street to 3,000,000 Court Street

City of Saginaw

City of Saginaw

Court Street reconstruction including water and sewer replacement

Reconstruction of 1.0 miles of five lane roadway to include removal and replacement of existing roadway with asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc. along with related items of work. Upgrade of existing street light system to new decorative street lights and decorative stamped sidewalk in the block between Court Street Bridge and Michigan Avenue. 3/1/2011

9/1/2011

$

Court Street Bridge 6,500,000 to Bay Road

City of Saginaw

City of Saginaw

Michigan Avenue resurfacing

Resurfacing to include cold milling and paving of 2.2 miles of five-lane roadway with HMA material and adjusting structures and isolated curb and gutter replacement

3/1/2011

9/1/2011

$

Stephens Street to 1,400,000 State Street

Reconstruction of 0.65 miles of five lane roadway to include removal and replacement of existing roadway with asphalt pavement and concrete curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Installation of ADA compliant sidewalk ramps, etc. along with related items of work. 3/1/2011

9/1/2011

$

Fraser Street to 4,500,000 Joslin Street

Reconstruction and Streetscape of Harrison Street to include .15 miles of removal and replacement of existing roadway with four lane boulevard concrete/asphalt pavement and curb and gutter. Construction of new utilities to replace existing 80 plus year old water main and sewer main and services. Streetscape to include decorative sidewalks, decorative stamped ADA sidewalk ramps, decorative street lights, park benches, landscape areas, trees and tree grates, altogether with related items of work. This will finish the $2,000,000 plus dollar project that was constructed in 2004 on Houghton Boulevard from Harrison Street to Michigan Avenue. This project was designed in anticipation of construction in 2004. Lack of available funds to build this has put this project on hold. This project is designed and ready to be bid! anytime

anytime

$

Catherine Street to 1,500,000 Houghton Avenue

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

d e tt

Michigan Avenue reconstruction including water and sewer replacement

t i m

b u S City of Saginaw

City of Saginaw

02262009

Harrison Street Reconstruction, water and sewer replacement and Streetscape

T O

s t s

P P A

-N

e u

q e R

Submitted Requests - Not Approved

8/1/2010

163 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

Project Description

Start Date

City of Saginaw

Reconstruction/redecking of this bridge that was built in 1971. Existing bridge has Norman Street Bridge over Veterans deteriorated and is in need of a redecking/reconstruction. The existing bridge consists Memorial Parkway Reconstruction/Redecking of two span, 114 feet long steel structure with a composite deck. 4/1/2010

City of Saginaw

Renovations and mechanical and plumbing upgrades to Saginaw City Hall to include but not be limited to removal of existing boiler and steam heat system with new roof mounted HVAV system and associated plumbing upgrades, new efficient window installations, new green roof to replace existing deteriorated roof, skylight over existing interior court system and all necessary internal improvements to make existing City hall more energy and people efficient. Proposed design was completed and bid in June of 2002, constructed has not taken place due to lack of funds. Project Saginaw City Hall Renovations and upgrades could be ready to bid within 30 to 90 days. 4/1/2009

City of Saginaw

Funding Request

Route (Infrastructure Only)

$

over Veterans 1,300,000 Memorial Parkway

9/1/2009

$

1315 South Washington Avenue, Saginaw 4,000,000 MI 48601

Parallel Raw Water main installation

Installation of a 36" raw watermain from the City of Saginaw Water Treatment Plant to Hotchkiss Road to provide assurance that the City of Saginaw can continue to provide water should the existing raw water main fail. 4/1/2010

4/1/2011

$

City of Saginaw

Re-line existing Twin 30" water mains

City of Saginaw recently spent over $600,000 to make improvements to the existing twin 30" watermains on the West side of the Saginaw River located between the River and Niagara Street. The existing cast iron/steel watermains that go from the Kidney Dialysis center on the west side of the river to Ojibway Island on the east side of the river are in need of relining or reconstruction. We believe that relining is a more economical solution to repair these deteriorating utilities. 7/1/2009

8/1/2009

$

beneath Saginaw 2,000,000 River

City of Saginaw

Replace existing 6" watermain with new 8" watermain

replace existing 6" watermain and water services with new 8" watermain and water services and necessary road repairs to accommodate water main improvements

$

Bay Road from Court Street to 4,000,000 Weiss Street

Replace existing 6" and 30"watermain with new watermain

replace existing 6" and 30"watermain and water services with new watermain and water services and necessary road repairs to accommodate water main improvements

4/1/2010

9/1/2010

$

Sheridan Road from Hoyt Street to 5,600,000 Hess Street

purchase emergency diesel generator for various water treatment pump stations to continue to provide water to various locations throughout Saginaw County during events that cause power failures.

3/1/2009

4/1/2009

$

200,000

$

Gratiot Road near Tittabawassee 200,000 River

City of Saginaw

T O

Emergency diesel generator for water treatment plant pump stations

City of Saginaw

Blast and paint Gratiot Road ground storage tank

City of Saginaw

Interim Improvements to disinfection system for Water Treatment Plant

City of Saginaw

City of Saginaw

02262009

itt

d e t

bm

s t s

-N

Blast and paint Gratiot Road ground storage tank

Interim Improvements to disinfection system for Water Treatment Plant

Installation of membrane type coating on west clearwell at Water Treatment Plant Installation of membrane type coating on west clearwell at Water Treatment Plant

security upgrades and improvements at the Water Treatment Plant

4/1/2010

7/1/2009

5/1/2009

7/1/2009

Security system shall consist of a chain link fence along the back side of the plant and infrared cameras in the front of the plant creating a virtual fence. Two thermal imaging cameras located at the front area of the plant and three thermal imaging cameras at the back of the plant. A card reader access system to eliminate keys and monitor access to the water plant facilities. In addition fencing, cameras, magnetic door locks and proximity card readers will be added to the remote stations. An Ethernet radio network and programmable logic controllers will be added to update monitoring between the Saginaw water treatment plant and the remote stations, along with many other security measures installed. 7/1/2009

Submitted Requests - Not Approved

8/1/2010

O R

P P A

e u

q e R

City of Saginaw

u S City of Saginaw

Project Name

Expected Completion Date

9/1/2010

8/1/2009

8/1/2009

9/1/2009

4/1/2010

D VE

30,000,000 various roads

$

City of Saginaw Water Treatment 1,500,000 Plant

$

City of Saginaw Water Treatment 750,000 Plant

$

City of Saginaw Water Treatment 2,000,000 Plant

164 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

City of Saginaw

Project Name

Project Description

miscellaneous improvements to the City of Saginaw Wastewater Treatment Plant wastewater processing systems

Start Date

Expected Completion Date

Miscellaneous improvements to the City of Saginaw Wastewater Treatment Plant wastewater processing systems to include the following: Settling tank weir replacements - $150,000, Return activated sludge valves replacement - $150,000, Septage receiving station - $250,000, Sludge storage tank mixing replacement $250,000, final settling tank rate control valve replacement - $500,000 along with related items

Funding Request

Route (Infrastructure Only)

$

City of Saginaw Wastewater 1,300,000 Treatment Plant

$

City of Saginaw Wastewater 1,700,000 Treatment Plant

$

City of Saginaw Wastewater 2,000,000 Treatment Plant

$

City of Saginaw Wastewater 1,500,000 Treatment Plant

$

City of Saginaw Wastewater 15,000,000 Treatment Plant

7/1/2009

$

City of Saginaw Wastewater 2,000,000 Treatment Plant

The City of Saline proposes to convert a portion of an existing city owned parking lot into a public market facility for a weekly Farmers Market facility' community events, special market events, and a public gathering site to enhance econmic activity and smart growth community revitalization of its downtown. The proposed 4,200 square foot covered open air market structure with related site work would create a permanant site for seasonal farmers market operations for between 30 and 40 vendors. This would develop regional retail sales location for area vegetable farmers, and other startup businesses like bakers, florists, etc to provide service and sales the citizens of Saline. The Market Plaza is also invisioned as a new community destination that will enhance existing downtown retail growth and provide a site for community organized cutlural arts presentations such and summer music concerts, and arts events. The Market Plaza site and building would be developed using sustainable( green) design and technology. The Market plaza will enhance downtown. 10.1.2009

5.1.2010

$

900,000

The City of Saline proposes to reconstruct and enhance their aging streetscape (within the public right-of-way) along Michigan Avenue and Saline-Ann Arbor Street, from Harris to Lewis and Mckay to Henry. Work includes the removal and reinstallation of existing concrete and brick paving, the installation of new light fixtures on existing historic street light poles with sustainable new lighting technology (LED), the installation of new landscaping, signage, and streetscape appurtenances (benches, bicycle racks, trash receptacles, and signage). This project will coordinate with future planned road improvements along Michigan Avenue (State Trunckline) proposed by the Michigan Department of transportation. 9.1.2009

7.1.2010

$

1,950,000

Final Settling tanks substructure replacement Final Settling tanks substructure replacement

4/1/2010

7/1/2009

Install additional Sanitary sewer from the Wastewater treatment plant beneath the Saginaw River going to the west.

City of Saginaw

River crossing pipeline

City of Saginaw

Influent bar screen replacement at wastewater treatment plant Influent bar screen replacement at wastewater treatment plant

City of Saginaw

Environmentally friendly green project, Biosolids to energy (digestors and power generators)

City of Saginaw

Aerator replacement at the Wastewater treatment plant

T O

N s

4/1/2010

6/1/2009

4/1/2010

5/1/2009

12/1/2009

O R

P P A

Environmentally friendly green project, Bio-solids to energy (digestors and power generators)

Aerator replacement at the Wastewater treatment plant

7/1/2009

7/1/2010

9/1/2009

10/1/2010

D VE

t s e

u q e

City of Saline

Saline, Michigan

R d

Saline Market Plaza (FARMERS MARKET)

i m

e t tt

City of Saline

b u S

Saline, Michigan

02262009

Saline Streetscape Reconstruction and Enhancement Project

Submitted Requests - Not Approved

165 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Saugatuck

City of Saugatuck

Project Name

Project Description

Start Date

2009 Drainage and Utility Improvements

Allegan:Storm Drainage, watermain and of road improvements between Elizabeth and Maple Streets. Project will eliminate drainage issues and improve storm water quality to Kalamazoo River and Lake Michigan. Also provide adequate fire flow capabilities with new water main. Holland:Storm water, watermain and road improvements between Francis and North Streets. Project will eliminate drainage issues and improve storm water quality to Kalamazoo River and Lake Michigan. Also provide adequate fire flow capabilities with new water main. IMason: mprove storm sewer, sanitary sewer, water main and roadway between Kalamazoo River and Griffith Streets. Project will eliminate drainage issues and improve storm water quality to Kalamazoo River and Lake Michigan. Also provide adequate fire flow capabilities with new water main. Also provide safer traffic and pedestrian flow downtown. Also provide reliable sanitary sewer to eliminate back-ups. North: Improve drainage with ditches and roadway improvements between Blue Star a5/9/2009

SAUGATUCK-DOUGLAS HARBOR DREDGING/IMPROVEMENTS

City of Saugatuck City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie

PP

O R

Funding Request

Route (Infrastructure Only)

D VE Allegan, Holland, Mason and North 3,950,000 Streets

7/10/2009

$

The Kalamazoo Harbor is the economic engine for the Saugatuck-Douglas area. It is host to 1,000 boats and many thousands more water sports enthusiasts during the summer season and a growing number of off season visitors as well. It provides the single most important reason that over two million visitors come from throughout the Midwest, the USA, Europe and beyond to vacation here. The area’s reputation as one of the Top 25 Art Destinations in the USA, the fifth most popular Midwest destination and one of the National Trust’s Dozen Distinctive Destinations in the United States has been earned in large part due to our pristine setting on one of Michigan’s most beautiful protected harbors. Today the area’s entire tourism economy, which is one of the largest in Michigan, including pleasure boating, charter fishing, water sports, retail businesses, restaurants, attractions, galleries, museums and the lodging industry are in great jeopardy because of the natural silting process that has reduced the depth of our harbor in most places to two feet! We are also faced with the need to remove and dispose of safely PCB contaminated materials from up stream paper mills that have je 90 Days

within 2 years

$

Bridge Repair including:• Replacement of the six (6) concrete/steel pier caps (the driving force for the project) • Patching of the concrete pier columns, abutments and deck • Repairs to the structural steel girders • Realignment and replacement of the steel bearings • Replacement of the expansion joints • Upgrades to the railings and guardrail • Extension of the deck drains • Channel improvements Project is funded in 2010 by MDOT Bridge Program but nonparticipating costs are expected to be $320,000 for each community. We are looking for assistance on these costs. 3/11/2009

3/12/2009

$

4,008,000 Blue star Highway

Construction of new box hanger at Municipal Airport

$

1,254,200

Emergency generator fuel system safety improvement

$

34,000

Install rotating beadcon at Municpal Airport

$

67,500

Construct PRV valve between Radar Base Area and High Press Zones

$

85,000

Expand existing T-hanger

$

94,500

Upgrade LED lighting at Municipal Airport

$

126,900

SSM

Expansion of existing airport apron

$

134,000

SSM

Improve Historical Landmark Water Standpipe

$

150,000

A T

City of Saugatuck

Expected Completion Date

City of Saugatuck

City of Saugatuck and City of the Village of Douglas Blue star Highway Bridge Repair Sault Sainte Marie

ub

SSM SSM SSM SSM

02262009

S

t s e

u q e

R d

e t tt

i m

SSM

s

O N

Submitted Requests - Not Approved

40,000,000 Infrastructure

166 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie City of Sault Sainte Marie

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

SSM

Install multi-purpose trail along W. Portage Ave

$

175,000

SSM

Construct Cold Storage Bldg at DPW Yard

$

200,000

SSM

Dredge Ashmun Bay board launch access

$

280,000

SSM

Energy improvement to Industrial Incubator Bldg

$

300,000

SSM

Construct new 4 unit T-hanger

$

351,000

SSM

Construct new parallel taxiway at Airport

$

460,000

SSM

Improve Rustic Campground

$

550,000

SSM

Relocate Meridian Street with Airport Industrial Park

$

750,000

SSM

Reassemble historic Fort Street Bridge for trail

$

1,400,000

SSM

Construct Smart Zone Breeder Bldg

$

1,500,000

SSM

Renovate Historic Federal Bldg for new City Hall

$

3,200,000

SSM

Consruct new Emergency Service Bldg for fire,police

$

6,200,000

SSM

$

50,000

SSM

Install interpretative walkway between Parking Deck and River of History Museum Install pump controller and telemetry system between Radar Tank and 14th St. Booster Station

$

80,000

SSM

Install bike/walkway on W., Easterday Ave

$

100,000

SSM

Improve various downtown parking areas

$

250,000

Restore and renovate Old Water Pumping Station at Sherman Park for public use

$

350,000

Install walkway base trailhead on Lower Coast Guard property

$

450,000

Linear Trail System

$

575,000

Improve Lower River Island city park

$

700,000

Install sanitary sewer and water main along Three Mile Road

$

800,000

Possible road widening and walk onW. Easterday Ave

$

1,000,000

Replace Riverside Drive Bridge over MissionCreek

$

1,250,000

Access and improve Lower River Island Park

$

1,300,000

Structural improvement to Carbide Dock

$

3,000,000

Construct new DPW Facility Bldg

$

6,300,000

$

3,200,000

SSM

e t t

SSM

it

SSM

m b u

SSM SSM

SSM SSM

S

SSM

City of Sault Ste. Marie City of Sault Ste. Marie

02262009

Historic Federal Bldg. Renovation

A T

PP

O N

R d

SSM

SSM

st

e u

eq

s

O R

Renovation of the Historic Federal Building to be utilized as the new City Hall

Submitted Requests - Not Approved

5/9/2009

11/9/2009

D VE

Route (Infrastructure Only)

167 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

Project Name

Project Description

Pine Street

Pine Street Reconstruction between W. Easterday Avenue and Leroy Street

E. 9th Avenue

A grade lift and stabilization of E. 9th Avenue between Seymour Street and E. 7th Street

E. 10th Avenue

A grade lift and stabilization of E. 10th Avenue between Seymour Street and E. 7th Street

A grade lift and stabilization of E. 10th Avenue between Shunk Road and E. 13th Street

E. 10th Avenue

City of Sault Ste. Marie City of Sault Ste. Marie

Standpipe Phase III

City of Sault Ste. Marie City of Sault Ste. Marie

Radar Road Tank Improvements

City of Sault Ste. Marie City of Sault Ste. Marie

PRV Valve Construction

City of Sault Ste. Marie City of Sault Ste. Marie

WTP Fuel Tank Improvements

City of Sault Ste. Marie City of Sault Ste. Marie

City Cold Storage Building

City of Sault Ste. Marie City of Sault Ste. Marie

Energy Improvements to Industrial Incubator

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

u S

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

02262009

Swinton Street

E. 7th Street

itt

W. 10th Avenue

bm

W. 14th Avenue

W. 18th Street

W. Spruce Street

Ridge Street

4/9/2009

9/9/2009

4/9/2009

6/9/2009

PP

O R 6/9/2009

Funding Request

$

D VE

Route (Infrastructure Only)

Pine St between W. Easterday Ave 360,000 and Leroy St

$

9th Ave between Seymour St and E. 70,000 7th St

$

E. 10th Ave between Seymour 70,000 St and E. 7th St E. 10th Ave between Shunk Road and E. 13th 80,000 St

4/9/2009

6/9/2009

$

4/9/2009

8/9/2009

$

150,000

4/9/2009

8/9/2009

$

175,000

4/9/2009

5/9/2009

$

85,000

4/9/2009

5/9/2009

$

34,000

Construction of a Cold Storage Building at the Department of Public Works Yard 6/9/2009 Energy improvements to the Industrial Incubator Building located in the Industrial Park which houses both City EDC and Private Industry 6/9/2009

9/9/2009

$

200,000

9/9/2009

$

300,000

$

Swinton St between E. 7th Ave and E. 350,000 5th Ave

$

E. 7th St between Swinton St and 325,000 Seymour St

$

W. 10th Ave from Davitt St to 340,000 Ashmun St

$

W. 14th Ave from Davitt St to 325,000 Ashmun St

$

W. 18th St between Oak St at W. 11th Ave and W. 4th 450,000 Ave

$

W. Spruce St from W. Portage Ave to 150,000 Fort St

$

Ridge St between W. Portage Ave 175,000 and Magazine St

Improvements, including tuckpointing, to the existing Historical Landmark Water Standpipe located at the intersection of Ryan Avenue and W. Easterday Avenue Improvement, including painting and safety improvements, to both the Exterior and Interior of the Radar Road Water Tank Construction of a PRV valve to isolate the system between the Radar Base Area and High Press Zones Emergency Generator Fuel System Safety Improvements at the Water Treatment Plant

e u

st

q e R

s

O N

Swinton Street Reconstruction between E. 7th Avenue and E. 5th Avenue

d e t

5/9/2009

A T

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

Start Date

Expected Completion Date

E. 7th Street Reconstruction between Swinton Street and Seymour Street

W. 10th Avenue Reconstruction from Davitt Street to Ashmun Street

W. 14th Avenue Reconstruction from Davitt Street to Ashmun Street

W. 18th Street Reconstruction between Oak Street at W. 11th Avenue and W. 4th Avenue

W. Spruce Street resurfacing from W. Portage Avenue to Fort Street

Ridge Street resurfacing between W. Portage Avenue and Magazine Street

Submitted Requests - Not Approved

5/9/2009

5/9/2009

5/9/2009

5/9/2009

5/9/2009

5/9/2009

5/9/2009

9/9/2009

9/9/2009

9/9/2009

9/9/2009

9/9/2009

7/9/2009

7/9/2009

168 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

Project Name

Oak Street

Project Description

Start Date

Oaka Street Reconstruction between Peck Street and W. Spruce Street

Seymour Street Resurfacing

Resurfacing of Seymour Street between Three Mile Road and Marquette Avenue

Ryan Avenue Resurfacing

Expected Completion Date

Resurfacing of Ryan Avenue between W. 10th Avenue and W. Easterday Avenue

5/9/2009

6/9/2009

8/9/2009

6/9/2009

8/9/2009

PP

O R 8/9/2009

Funding Request

Route (Infrastructure Only)

$

Oaka St between Peck St and W. 140,000 Spruce St

$

Seymour St between Three Mile Road and 250,000 Marquette Ave

$

Ryan Ave between W. 10th Ave and 225,000 W. Easterday Ave

D VE

6/9/2009

8/9/2009

$

Meridian St between W. 12th Ave and W. 8th 125,000 Ave

6/9/2009

9/9/2009

$

200,000

7/9/2009

12/9/2009

$

1,254,200

7/9/2009

9/9/2009

$

134,000

8/9/2009

11/9/2009

$

94,500

4 Unit T-Hangar

Construction of a new 4 unit T-Hangar at the local Municipal Airport - Sanderson Field 8/9/2009

11/9/2009

$

351,000

City of Sault Ste. Marie City of Sault Ste. Marie

Meridian Street Reloc. (Airport)

Relocation of Meridian Street from the I-75 Business Spur to Davitt Street, within the Airport Industrial Park 8/9/2009

11/9/2009

$

Meridian St from the I-75 Business 750,000 Spur to Davitt St

City of Sault Ste. Marie City of Sault Ste. Marie

Rotating Beacon

Installation of a rotating beadcon at the local Municipal Airport - Sanderson Field

7/9/2009

9/9/2009

$

67,500

City of Sault Ste. Marie City of Sault Ste. Marie

LED Lighting Upgrades

7/9/2009

9/9/2009

$

126,900

City of Sault Ste. Marie City of Sault Ste. Marie

Fort Street Bridge Reassembly

8/9/2009

7/10/2009

$

1,400,000

City of Sault Ste. Marie City of Sault Ste. Marie

Emergency Serv. Bldg.

Upgrading of LED lighting at the local Municipal Airport - Sanderson Field The reassembly of the historic Fort Street Bridge at Ashmun Bay for multi-purpose trail Construction of a new Emergency Service Building that will house Fire and Police Departments

8/9/2009

8/10/2009

$

6,200,000

City of Sault Ste. Marie City of Sault Ste. Marie

Smart Zone Breeder Building

Construction of a Smart Zone Breeder Building in the Airport Industrial Park Improvements to the Rustic Campground and entrance drive at Sherman Park. Construction of a picnic shelter near the beach

8/9/2009

8/10/2009

$

1,500,000

8/9/2009

7/10/2009

$

550,000

A T

City of Sault Ste. Marie City of Sault Ste. Marie

Meridian Street Resurfacing

City of Sault Ste. Marie City of Sault Ste. Marie

W. Spruce Street

City of Sault Ste. Marie City of Sault Ste. Marie

Box Hangar

City of Sault Ste. Marie City of Sault Ste. Marie

Expand Airport Apron

City of Sault Ste. Marie City of Sault Ste. Marie

2 - T-Hangar Expansion

Constrution of a new box hangar at the local Municipal Airport - Sanderson Field Expansion of the Existing Airport Apron at the local Municipal Airport - Sanderson Field Expand an existing T-Hangar by 2 units at the local Municipal Airport - Sanderson Field

City of Sault Ste. Marie City of Sault Ste. Marie

Sherman Park Phase II

eq

s

st

e u

O N

R d

e t t

it

m b u

City of Sault Ste. Marie City of Sault Ste. Marie

Resurfacing of Meridian Street between W. 12th Avenue and W. 8th Avenue Underground utility improvements on W. Spruce Street between Pine Street and Governor Osborn Blvd.

City of Sault Ste. Marie City of Sault Ste. Marie

W. Portage Avenue

Installation of a Multi-Purpose Trail along W. Portage Avenue between W. Easterday Avenue and the Power Canal 7/9/2009

10/9/2009

$

W. Portage Ave between W. Easterday Ave and 175,000 the Power Canal

City of Sault Ste. Marie City of Sault Ste. Marie

Ashmun Bay Dredging

Dredging for existing Ashmun Bay boat launch access

8/9/2009

10/9/2009

$

280,000

CSO Phase C-1

Construction of the next CSO Phase (C-1), which will be located in the Water Street Area. All roads will include underground utility improvements and street reconstruction. Water street will also include Streetscape improvements in the historic area.

7/9/2009

11/10/2009

$

3,000,000

S

City of Sault Ste. Marie City of Sault Ste. Marie

02262009

Submitted Requests - Not Approved

169 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

City of Sault Ste. Marie City of Sault Ste. Marie

Project Name

Project Description

Ashmun Streetscape (I-75 Bus Spur)

Start Date

Expected Completion Date

Construction of a new Ashmun Streetscape including both underground and above ground improvements along the existing Ashmun street between Easterday Avenue and Sheridan Drive

8/9/2009

$

Ashmun St between Easterday Ave and Sheridan 2,000,000 Drive

$

3-Mile Road, Mackinac Trail, I75 Bus Spur 1,720,000 Intersection

$

1,500,000

7/1/2012

$

2,000,000

N/A

$

1,500,000

$

575,000

6/10/2009

Construction of a new roundabout at the 3-Mile Road, Mackinac Trail, I-75 Bus Spur Intersection 8/9/2009

Funding Request

Route (Infrastructure Only)

O R

City of Sault Ste. Marie City of Sault Ste. Marie

Roundabout Traffic Safety Project

City of Sault Ste. Marie Sault Ste. Marie

Airport Industrial Park

City of Sault Ste. Marie Sault Ste. Marie

Camp Lucas Infrastructure

City of Sault Ste. Marie City of Sault Ste. Marie

Historic Structures - Water Street

Southwest side infrastructure related to the development of the Airport Industrial Park 7/1/2010 Construction of the necessary infrastructure to develop the Camp Lucas site, including road, water and sewer. 7/1/2010 Improvements to two existing historical homes/structures located on Water Street between Brady Street and Johnston Street N/A

City of Sault Ste. Marie City of Sault Ste. Marie

Ashmun Bay Recreation Area

Linear Trail System

City of Sault Ste. Marie City of Sault Ste. Marie

City Parking Lots Impr. Downtown

Improvements to various downtown parking areas owned by the City

N/A

N/A

$

250,000

City of Sault Ste. Marie City of Sault Ste. Marie

Installation of Sheet Piling at the City's Kemp Marina dock to alleviate wave damage N/A Installation of floating docks and pavement of the parking lot at the City's Harvey Marina N/A

N/A

$

200,000

City of Sault Ste. Marie City of Sault Ste. Marie

Kemp Marina Sheet Piling Harvey Marina Floating Docks and Parking Lot Pavement

N/A

$

250,000

City of Sault Ste. Marie City of Sault Ste. Marie

Lower River Island Phase I

Access and improvements to the Lower River Island Park which is a City park

N/A

N/A

$

1,300,000

City of Sault Ste. Marie City of Sault Ste. Marie

Lower River Island Phase II

Improvements to the Lower River Island Park which is a City park

N/A

N/A

$

700,000

City of Sault Ste. Marie City of Sault Ste. Marie

I-500 Track Relocation

N/A

$

1,500,000

City of Sault Ste. Marie City of Sault Ste. Marie

Multipurpose Trail

The relocation of the I-500 track should the current location be sold to a developer. N/A Construction of a multi-purpose trial to be located between the I-75 Tunnel and the I75 Business Spur

$

300,000

$

E. 20th Ave between M-129 (Ashmun St) and 500,000 Minneapolis St

$

Ashmun St between W. 10th Ave and Easterday 1,200,000 Ave

N/A

$

7,000,000

N/A

$

8,000,000

City of Sault Ste. Marie City of Sault Ste. Marie

t i m

CSO Phase C-2

b u S

City of Sault Ste. Marie City of Sault Ste. Marie

02262009

R d

e t t

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

7/1/2012

E. 20th Avenue Reconstruction between M-129 (Ashmun Street) and Minneapolis Street

E. 20th Avenue

Ashmun Street (I-75 Bus Spur)

City of Sault Ste. Marie City of Sault Ste. Marie

s t s

-N

e u

eq

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

T O

P P A

6/10/2009

D VE

CSO Phase C-3

Armory Place

Ashmun Street reconstruction and utility improvements between W. 10th Avenue and Easterday Avenue Construction of Phase C-2 of the CSO project which will be performed in the East Island Area N/A Construction of Phase C-3 of the CSO project which will be performed in the West Island Area N/A

Armory Place Reconstruction between Bingham Avenue and Kimball Street

Oak Street

Oak Street Reconstruction between W. 20th Street and W. 4th Avenue

South St. Infrastructure

Improvements to the South Street infrastructure between W. 4th Avenue and W. 12th Street

Submitted Requests - Not Approved

$

Armory Place between Bingham 450,000 Ave and Kimball St

$

Oak St between W. 20th St and W. 4th 200,000 Ave

$

South St between W. 4th Ave and W. 1,000,000 12th St

170 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

City of Sault Ste. Marie City of Sault Ste. Marie

Project Name

Project Description

Start Date

Marquette Avenue

Construction/Extension of Marquette Avenue between Shunk Road and Riverside Drive (near where 16th Avenue would intersect)

Easterday Avenue Overpass

Possible road widening and walkway improvements on the W. Easterday Avenue Overpass/Bridge (over I-75)

Installation of a Bikepath/Walkway on W. Easterday Avenue between Riverview Way and W. Portage Avenue

W. Easterday Avenue Bikepath/Walkway

Expected Completion Date

O R

A T

PP

O N

Funding Request

$

Marquette Ave between Shunk Road and Riverside Drive (near where 16th Ave would 2,200,000 intersect)

$

W. Easterday Ave Overpass/Bridge 1,000,000 (over I-75)

D VE $

W. Easterday Ave between Riverview Way and W. 100,000 Portage Ave

$

south side of the Power Canal from W. Portage Ave to 300,000 Ashmun St

City of Sault Ste. Marie City of Sault Ste. Marie

Installation of a Biking/Hiking Trail to run along the south side of the Power Canal from W. Portage Avenue to Ashmun Street Installation of an interperative walkway between the existing Parking Deck and the Interpretive Walkway River of History Museum Lower Coast Guard Base Property Waterfront Installation of walkway base trailhead on the Lower Coast Guard Base Property Walkway Base Trail Head located on Riverside Drive on the St. Mary's River N/A

City of Sault Ste. Marie City of Sault Ste. Marie

Brady Park on St. Mary's River

City of Sault Ste. Marie City of Sault Ste. Marie

Pump Controller & Telemetry

City of Sault Ste. Marie City of Sault Ste. Marie

Three Mile Road

City of Sault Ste. Marie City of Sault Ste. Marie

Old Water Pumping Station Reuse Project

City of Sault Ste. Marie City of Sault Ste. Marie

Riverside Drive Bridge

City of Sault Ste. Marie Sault Ste. Marie

Riverside Drive Bridge

City of Sault Ste. Marie City of Sault Ste. Marie

Parallel Taxiway Project: Phase II

Construction of a new parallel taxiway at the local Municipal Airport - Sanderson Field

City of Sault Ste. Marie City of Sault Ste. Marie

Carbide Dock Impr.

N/A

$

3,000,000

N/A

$

1,500,000

N/A

$

6,300,000

City of Sault Ste. Marie City of Sault Ste. Marie City of Sault Ste. Marie City of Sault Ste. Marie

Power Canal South Side Biking/Hiking Trail

tt i m

d e t

s

$

50,000

$

450,000

$

450,000

N/A

$

80,000

N/A

$

800,000

N/A

$

350,000

Replacement of the Riverside Drive Bridge Over Mission Creek

$

1,250,000

Replacement of the Mission Creek bridge on Riverside Drive

$

1,250,000

$

460,000

st

Installation of a Waterfront walkway trailhead area at the City's Brady Park Installation of pump controller and telemetry system between the Radar Tank and the 14th Street Booster Station to WTP datalink N/A Installation of Sanitary Sewer and Water Main along Three Mile Road between Ashmun Creek and M-129 N/A Restoration and renovation of the Old Water Pumping Station at Sherman Park for public use N/A

e u

q e R

N/A

City of Sault Ste. Marie City of Sault Ste. Marie

Pullar Phase II & Pullar Parking Lot

City of Sault Ste. Marie City of Sault Ste. Marie

DPW Facility Bldg.

Structural improvements to the existing Carbide Dock via Sheet Pile Dock Facing N/A Improvements to the Pullar Stadium located on E. Portage Avenue. Includes Phase II construction and parking lot improvments. N/A Construction of a new DPW Facility Building to replace the existing building located on E. Easterday Avenue N/A

Cannelton Superfund Site

Infrastructure needed to develop the Cannelton Superfund Site.

7/1/2009

7/1/2011

$

850,000

City of Sault Ste. Marie Sault Ste. Marie

Meridian Street Reconstruction

Reconstruction, repaving, Meridian Street

7/1/2009

7/1/2010

$

1,300,000

City of Sault Ste. Marie Sault Ste. Marie

Fort Street Bridge Reassmebly

7/1/2010

$

1,400,000

City of Scottville City of South Lyon City of South Lyon

Repaint Elevated Water Tank

Reassembly of the historic Fort St. Bridge 7/1/2009 This project would include sandblasting and repainting the interior and exterior of the City's 200,000 gallon elevated water tank. 5/9/2009 4" & 6" Water main Uprgades Storm Sewer System Improvements

7/9/2009

$ $ $

294,000 5,500,000 4,400,000

S

ub

City of Sault Ste. Marie Sault Ste. Marie

City of Scottville City of South Lyon City of South Lyon

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

171 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon City of South Lyon

City of Southgate

Southgate, MI

City of Springfield

City of Springfield

Project Name

$

125,000

4/15/2009 5/31/2009 4/30/2009 6/30/2009

$ $ $ $

150,000 40,000 100,000 250,000

Reconstruction of a local roadway that is in poor condition. The project will consist of road reconstruction, curb/gutter installation, and some storm sewer work. 4/1/2009

8/1/2009

$

275,000

Harmonia Road Reconstruction

Reconstruction of a major roadway that services the cities of Springfield and Battle Creek, as well as Bedford Township, and serves as a major artery to the Fort Custer Industrial Park. This project would also consist of removing an existing 90 degree turn that has been a safety concern for many years. 4/15/2009

9/30/2009

$

2,500,000

Ladder Truck Rehabilitation

Our Fire Department has one ladder truck; it was put into action in 1993. The cost to rehabilitate said truck is about 40% of what the estimated cost is to replace it. This project would cover the long and expensive process of rehabilitating the ladder truck. 6/1/2009

9/30/2009

$

150,000

Business 94/20th Street Intersection Heights Resurfacing

This project will consist of removing a dangerous turn lane at the SE corner of Business I94 and 20th Street. The configuration of the "New Jersey Turn" is a problem with traffic flow, safety, and development of this busy corner, Mill and overlay

8/1/2009 8/30/2009

$ $

210,000 Business I94 600,000

New Moon Terrace Reconstruction

d e tt

t i m

ub

City of Springfield

S

02262009

st

9/1/2009

City of Springfield

City of Springfield City of Springfield

N s

D VE

141,000 N/A

City of Springfield

City of Springfield City of Springfield

T O

P P A

Funding Request 4,750,000 1,750,000 750,000 100,000 20,000 58,000 70,000 1,330,000 875,000 250,000 400,000 2,000,000 550,000 1,100,000 775,000 150,000 350,000 300,000 500,000 30,000 40,000 2,150,000 1,200,000

$

Hybrid Public Safety Vehicle Purchase 33rd Street Helmer Farms Resurfacing Westlake Woods Resurfacing

City of Springfield

O R

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Route (Infrastructure Only)

8/1/2009

City of Springfield City of Springfield City of Springfield City of Springfield

City of Springfield

Start Date

This is a 10 kilowatt Photovoltaic System at the Southgate Veterans' Memorial Library using thin amorphous silicon cells (or equally cost-effective and resilient material. 5/1/2009 Replace current heating/cooling infrastructure in the Springfield Municipal Building with 6/1/2009 City Hall Geothermal Heating/Cooling Project a geothermal source. Veterans Library Photovoltaic System

City of Springfield City of Springfield City of Springfield City of Springfield

City of Springfield

Project Description Pressure District Separation WTF - New Well Site WTF - Re-Chlorination Facility LED Street Lighting for Public Property LED Lighting for Volleyball/Skating Rink Insulation for Public Building Upgrade/Update Public Building Heating Systems Sanitary Sewer Rehabilitation Program Public Parking Lot Rehabilitaton Volunteer Park Paving Rail Trail Rehabilitation Dixboro Road Paving - 8 Mile Rd. to 9 Mile Rd 10 Mile Rd. Widening - Dixboro to Hagadorn Pontiac Trail Widening - CSX Railroad to 11 Mile Rd 9 Mile Rd. Reconstruction Backup Generators for Pump Stations WWTP - Standby Generator WWTP - Main Electronic Switchgear WTF - R & R Induced Draft Aerator SCADA System Bury Electrical Service - Wells St. Paking Lot 2009 Road Rehabilitation Program Pontiac Trail Widening - 8 Mile Rd. to 9 Mile Rd

Expected Completion Date

e u

Purchase and equip three hybrid vehicles to be utilized by the Public Safety Department for patrols, responding to emergencies, and other travel. This is expected to reduce the Department's $60,000 annual fuel expenses by 50%. Payback on three vehicles will be approximately 3 years; patrol vehicles typically continue in our department for 5-7 years. Road construction Mill and overlay Mill and overlay

q e R

Submitted Requests - Not Approved

4/1/2009 4/15/2009 4/1/2009 4/15/2009

6/1/2009 6/1/2009

172 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Springfield

City of Springfield

Project Name

Project Description

Start Date

Expected Completion Date

Due to failing pavement and roadway flooding associated with rain events 0.46 Miles of HMA Base Crushing and Shaping, Conc. Curb & Gutter, HMA Paving & Restoration, Drainage Improvements, Storm Sewer Improvements, and Misc. Reconstruction have been designed for to address New Moon Terraces issues 4/1/2009

New Moon Terrace Improvements Project

7/31/2009

O R

City of Springfield

City of Springfield

City of Springfield

City of Springfield

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

02262009

$

Oak Grove Rd. & Beaver Dam Rd.; Castle Drive Rd. & Royal Rd.; West Lake Woods & Windy Place; Hickory Nut Lane & Fortune St.; 20th St. & 24th St. 28th St.& Goguac St. 21st St.& 22nd St. 23rd St. & 25th St. 26th St. & 27th St. 1,300,000 Betterly & Fris

Main East/West Thoroughfare between 96 and 37 2,050,000 in Springfield

D VE

P P A

2009 Streets Paving Project

Harmonia Road Reconstruction Project Municipal Dam-Pine River Shore Protection Project

Harmonia Rd. running between 96 and 37 has always been problematic for the city. Poor swampy sub soils weaken the structural condition and shorten the lifespan of the roadway. The project will include approximately 7,000' of roadway reconstruction including structural treatments consisting of excavation and backfill as well as utilizing geogrid and geotextile fabric in select sections. The project will also involve replacing failing sections of water main and extending the existing sanitary sewer system to the west. 6/1/2009 Replace/construct approximately 500 feet existing failing Sheet Piling shore protection and related work including Canoe Portage provisions. 8/1/2009

10/30/2009

$

10/31/2009

$

100,000

East Water Tower Construction Project

Construct new 500,000 gallon Water Tower on East area of City to stabilize water pressure from large demand at 3 State prisons and for the development of the Saint Louis/Bethany Reniassance Zone.

9/1/2009

10/31/2010

$

1,110,000

Jackson Road Watermain and Road Reconstruction Project

Jackson Road watermain has been identified as necessary for transmission route for the City Water System Replacement Project. Jackson Road also serves the Woodside Industrial Park and would serve Great Lakes Trucking facility and the proposed location of a Bio-diesel plant which the two firms are located on opposite sides of a railroad that has no crossing at Jackson Road. The project would include water main, road improvements road reconstruction including curb and gutter, storm sewer, sanitary sewer extension and rail crossing to serve existing and new industry.. 9/1/2009

12/31/2010

$

Michigan Avenue to 1,619,370 Main Street

Jackson Road Watermain and Road Reconstruction Project

Jackson Road watermain has been identified as necessary for transmission route for the City Water System Replacement Project. Jackson Road also serves the Woodside Industrial Park and would serve Great Lakes Trucking facility and the proposed location of a Bio-diesel plant which the two firms are located on opposite sides of a railroad that has no crossing at Jackson Road. The project would include water main, road improvements road reconstruction including curb and gutter, storm sewer, sanitary sewer extension and rail crossing to serve existing and new industry.. 9/1/2009

12/31/2010

$

Michigan Avenue to 1,619,370 Main Street

t i m

b u S

City of St. Louis

$

New Moon Terrace from Helmer Rd. to 350,000 Helmer Rd.

The existing roadways through "The Heights" and "West Lake Woods" are showing significant signs of surface aging with the overall structural condition being ok. In orde to preserve the existing structural condition and improve surface conditions 7.31 Miles of Cold Milling and resurfacing 1-1/2" HMA pavement, misc. structure adjustments, and misc. sidewalk replacement have been designed for. 4/1/2009

d e tt

City of St Louis

T O

Funding Request

Route (Infrastructure Only)

s t s

-N

e u

q e R

Submitted Requests - Not Approved

7/31/2009

173 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St. Louis

Project Name

St Louis/Bethany Reniassance Zone Development

Project Description

Start Date

Construct Class A roadway, water main, sanitary sewer, storm sewer/drainage improvements to Reniassance Zone for future business/Industrial development.

St Louis/Bethany Reniassance Zone Development

City of St Louis

Wastewater Treatment System Improvements identified by Rowe Incorpoated in consultation with MDEQ include a total of 11,310,000 in improvements necessary including Sanitary Sewer Retention Basin $5,200,000, Michigan Avenue Pump Station Upgrade and Force Main $1,560,000, and Sewer Treatment Plant upgrades $4,550,000. Rowe has indicated that of these Projects the Sanitary Sewer Retention Wastewater Treatment system Improvements Basin could be engineered, permitted and bid in 180 days. 9/1/2009

City of St Louis

City of St Louis-City of Alma

Construct Class A roadway, water main, sanitary sewer, storm sewer/drainage improvements to Reniassance Zone for future business/Industrial development.

9/1/2009

City of St Louis

City of St Louis

T O

9/1/2009

12/31/2010

$

5,200,000

7/1/2009

9/30/2009

$

400,000,000

Velsicol Superfund Site Clean-up Project

7/1/2009

9/30/2009

$

400,000,000

M46-Begole-Cheesman Road Water Main Project

Part of project to replace the City's water system as "strongly suggest"ed by the MDEQ Water Bureau estimated to cost $30,000,000 in total. TheM-46-BegoleCheesman Water Main Project is to complete a water main loop necessary as part of the project whole. Project estimated by FTCH Engineers. 7/1/2009

9/30/2010

$

Rehabilitate one 36" vertical Hydrolic Trubine and Misc electrical upgradesHydroelectric generation Unit #6 - Part of City Renewable portfolio standards plan required by PA 295 2008. 3/1/2009

8/31/2009

$

100,000

12/31/2009

$

160,000

9/30/2009

$

105,000

6/30/2010

$

175,000

$

Center Street from Mill Street to 280,000 Watson Street

s t s

-N

e u

q e R

City of St Louis

City of St Louis

City of St Louis

tt i m

d e t

City Hall/Fire Station/Police Department Energy and Security Improvement Project

Energy and security related improvements to the 60+ year old City Hall/|Police Department/Fire Hall which is one building. Improvements to include ceilinig insulation replacement of lighting fixtures with more energy efficient fixtures, construct exterior wall and partial roof of courtyard for offices of Code and Building enforcement officers to combine offices with Police department for security and safety reasons, install computerized building passkey security system, replace windows, insulate walls of building, Council chambers security improvements, and computerized temperature control system, among other security and energy related improvements Project currently being designed under the supervision of the City Safety and Security Committee. 7/1/2009

Center Street Water Main Replacement

Replacement of 50+ year old watermain. Replacement of street surface necessitated by water main excavation. 7/1/2009

b u S 02262009

$

O R

Superfund Site Clean-up. Feasibility Study Nearly complete by MDEQ Superfund Division. Need State match of $40,000,000 for perported $400,000,000 estimated cost of project.

City of St Louis

City of St. Louis

10/31/2010

M-46 At Croswell Road South approximately .7 mile + drainage to 2,900,000 Pine River

D VE

Velsicol Superfund Site Clean-uo Project

Replace existing high pressure sodium street lamping to energy efficient LED technology throughout the City. Part of the City's Energy Optimization plan required Street Lighting Replacement Project under PA 295 2008 7/1/2009 Rebuild one existing launch and construct new launch with docks, lighting and related Leppien Park-Michigan Avenue Boat Launch work. 7/1/2009

City of St Louis

$

Superfund Site Clean-up. Feasibility Study Nearly complete by MDEQ Superfund Division. Need State match of $40,000,000 for perported $400,000,000 estimated cost of project.

Hydroelectric Unit #6 Rehabilitation

City of St Louis

Funding Request

Route (Infrastructure Only)

M-46 At Croswell Road South approximately .7 mile + drainage to 2,900,000 Pine River

10/31/2010

P P A

City of St Louis

City of St Louis

Expected Completion Date

Submitted Requests - Not Approved

10/31/2009

Water Main along State Street and Cheesman Road to Begole Road to M2,785,400 46 to City Limits

174 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St Louis

City of St. Louis

City of St. Louis

City of St Louis

City of St. Louis

City of St Louis

City of St. Louis

City of St Louis

City of St. Louis

City of St Louis

Project Name

Project Description

Start Date

Saginaw Street Water Main Replacement

Replacement of 50+ year old watermain. Replacement of street surface necessitated by water main excavation. 7/1/2009

Center Street Water Main Replacement

Replacement of 50+ year old watermain. Replacement of street surface necessitated by water main excavation. 7/1/2009

Saginaw Street Water Main Replacement

Replacement of 50+ year old watermain. Replacement of street surface necessitated by water main excavation. 7/1/2009

Delaware Street Water Main Replacement

Replacement of 50+ year old watermain. Replacement of street surface necessitated by water main excavation. 7/1/2009

Delaware Street Water Main Replacement

Replacement of 50+ year old watermain. Replacement of street surface necessitated by water main excavation. 7/1/2009

Maple Street Infrastructure Reconstruction

Replace 50+ year old water main, sanitary and storm sewer. Reconstruct street surface including curb and gutter, drainage and sidewalk.Current project status - in final design.

Maple Street Infrastructure Reconstruction

Replace 50+ year old water main, sanitary and storm sewer. Reconstruct street surface including curb and gutter, drainage and sidewalk.Current project status - in final design.

Corinth/Prospect Street Infrastructure Reconstruction

Replace 50+ year old water main, sanitary and storm sewer repairs. Reconstruct street surface including curb and gutter, drainage.Current project status - in preliminary design

Corinth/Prospect Street Infrastructure Reconstruction

Replace 50+ year old water main, sanitary and storm sewer repairs. Reconstruct street surface including curb and gutter, drainage.Current project status - in preliminary design

Main Street Infrastructure Reconstruction

tt i m

d e t

Main Street Infrastructure Reconstruction

T O

s t s

10/31/2009

10/31/2009

-N

Replace 50+ year old water main, sanitary and storm sewer. Reconstruct street surface including curb and gutter, drainage.Current project status - in preliminary design

Replace 50+ year old water main, sanitary and storm sewer. Reconstruct street surface including curb and gutter, drainage.Current project status - in preliminary design

5/1/2009

5/1/2009

10/31/2009

O R

P P A

e u

q e R

Expected Completion Date

10/31/2009

10/31/2009

9/30/2009

9/30/2009

6/1/2009

6/1/2009

6/1/2009

6/1/2009

Funding Request

$

Route (Infrastructure Only)

Saginaw Street from Mill Street to 280,000 Watson Street

$

Center Street from Mill Street to 280,000 Watson Street

$

Saginaw Street from Mill Street to 280,000 Watson Street

$

Delaware Street from North Street 330,000 to Crawford Street

$

Delaware Street from North Street 330,000 to Crawford Street

$

Maple Street from State Street to 578,000 Hazel Street

$

Maple Street from State Street to 578,000 Hazel Street

$

Corinth/Prospect Streets from Main Street to Olive 891,985 Street

$

Corinth/Prospect Streets from Main Street to Olive 891,985 Street

$

Main Street from Pine River bridge 988,720 to north City Limits

$

Main Street from Pine River bridge 988,720 to north City Limits

D VE

City of St. Louis

Reconstruct alley in 300 block of downtown to include milling existing asphalt, construct storm sewer, make drainage improvements and repave alley. Construct Downtown 300 Block Alley Imrovements and public parking lot at end of North Street at Mill Street including drainage and paving of Public Parking Lot Project existing gravel lot. 7/1/2009

9/30/2009

$

180,000

City of St Louis

City of St Louis

Reconstruct alley in 300 block of downtown to include milling existing asphalt, construct storm sewer, make drainage improvements and repave alley. Construct Downtown 300 Block Alley Imrovements and public parking lot at end of North Street at Mill Street including drainage and paving of Public Parking Lot Project existing gravel lot. 7/1/2009

9/30/2009

$

180,000

City of St Louis

City of St. Louis

Mill Street Bridge Rehabilitation

Upgrades include bridge deck replacement, barrier rail rehabilitation, approach improvements and misc. maintenance - Project Status: Preliminary design complete. 5/1/2009

8/31/2009

$

Mill Street Bridge 400,000 over the Pine River

City of St Louis

City of St Louis

Mill Street Bridge Rehabilitation

Upgrades include bridge deck replacement, barrier rail rehabilitation, approach improvements and misc. maintenance - Project Status: Preliminary design complete. 5/1/2009

8/31/2009

$

Mill Street Bridge 400,000 over the Pine River

City of St Louis

b u S

02262009

Submitted Requests - Not Approved

175 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of St Louis

City of St Louis

Project Name

Project Description

Start Date

Mill and repave Woodside Drive through the Woodside Industrial Park. Project Status Log Job which would not require much engineering. 5/1/2009

Woodside Drive Rehabilitation

City of St Louis

City of St Louis City of St. Louis-City of Alma City of St Louis-City of Alma

Franklin Street Infrastructure Reconstruction Michigan Avenue Sidewalk-Pedestrian Path Project Michigan Avenue Sidewalk-Pedestrian Path Project

City of St. Ignace

St. Ignace

North Huron Scenic Pathway

Replace 50+ year old water main, sanitary and storm sewer. Reconstruct street surface including curb and gutter, drainage and sidewalk.Current project status - in final design. 5/1/2009 Construct Sidewalk-Pedestricn path from State Street to Jerome Road in City of Alma. Pedestrian safety project to connect the two cities. 7/1/2009 Construct Sidewalk-Pedestricn path from State Street to Jerome Road in City of Alma. Pedestrian safety project to connect the two cities. 7/1/2009 Development of a non-motorized pathway from St. Igance to Drummond Island, along current state, county and federal routes. 7/1/2009

City of St. Ignace

St. Ignace

City of St. Ignace WWTP Upgrades

Upgrades and enhancements to the cit of St. Ignace Wastewater Treatment Plan.

Historic Train Depot Project.

In the mid 1990’s, the City purchased the abandoned railroad depot, which is located on the north end of the downtown, and renovated the building with the aid of State Historic Preservation grants. The building, still City-owned, houses the Clinton County Arts Council Train Museum, a public meeting site, and is located across the street from the Briggs Public Library. The City contracted with THA Architects and Engineers to develop a master plan for the Depot site. The plan proposes a permanent location for a farmer’s market, a play area for children, and a pavilion and stage area for local events, in addition to landscaping, parking and further restoration of the site. In 2009 the St Johns Rotary in partnership with the City and other civic organizations are resurrecting the exterior master plan to address those needs. The addition of a Rails to Trails convenience center/rest rooms, full size gazebo, and other amenities will further the develop the area as a historic destination. The restoration of (3) existing rail cars and museum will further educate current and future generations o the critical role that railroads provided in years past. The railroad created new commun

South State Area - CSO

Combined Sewer Overflow Separation Project Separate combined sewers, new water main, roadway and ADA accessible sidewalk construction included. To MDEQ 1/26/09 for Permits. [4th Quarter 2009 SRF Funding] 3/30/2009

City of St Louis City of St Louis

Expected Completion Date

T O

7/31/2009

9/30/2009

O R

P P A 7/1/2009

9/30/2009 9/30/2009

Funding Request

$

D VE $

$ $

Route (Infrastructure Only)

Woodside Drive from Main Street to 439,416 Michigan Avenue Franklin Street from State Street 723,850 to Hazel Street Jerome Road to 170,000 State Street Jerome Road to 170,000 State Street

7/1/2014

$

57,000,000 M-134, H-63

7/1/2011

$

4,435,000

$

300,000

$

South State Street Wallace to 820,000 Granada Michigan Ave Morton to East Dead End Morton Avenue - Harrison to Wolcott Harrison Avenue - Wayne to 1,123,000 Morton

N s

City of St. Johns

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

u S

City of St. Joseph

City of St. Joseph

City of St. Joseph

02262009

d e tt

t s e

qu

e R

6/30/2009

Combined Sewer Overflow Separation Project Separate combined sewers, new water main, roadway and ADA accessible sidewalk construction included. To MDEQ 1/26/09 for Permits. [4th Quarter 2009 SRF Funding] 3/30/2009

6/30/2009

$

Marina Drive to Ridgeway - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Design is well underway. [On DWRF PPL List, not funded]

4/30/2009

7/30/2009

$

87,000 Not Applicable

Upton Drive to Ridgeway - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Design is well underway. [On DWRF PPL List, not funded]

4/30/2009

7/30/2009

$

87,000 Not Applicable

North Upton - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Design is well underway. [On DWRF PPL List, not funded]

4/30/2009

7/30/2009

$

North Upton Drive 180,000 Upton to Ridgeway

Morrison Channel River Crossing

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Design is well underway. [On DWRF PPL List, not funded]

4/30/2009

8/30/2009

$

188,000 Not Applicable

it

Michigan Avenue Area - CSO

bm

Submitted Requests - Not Approved

176 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of St. Joseph

Morton Avenue - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability) to be bid with Michigan Avenue Project listed above. To MDEQ 1/26/09 for Permits. [On DWRF PPL List, not funded] 3/30/2009

City of St. Joseph

West Basin Marina Site and Building Improvements - Phase I

Site enhancements and roadway safety improvements on Marina Drive next to West Basin Marina. 4/30/2009

Orchard Avenue - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Project will also include sanitary sewer, storm sewer, roadway and ADA accessible sidewalk construction. Design is well underway. [On DWRF PPL List, not funded] 5/15/2009

Morton Avenue - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Project will also include sanitary sewer, storm sewer, roadway and ADA accessible sidewalk construction. Design is well underway. [On DWRF PPL List, not funded] 5/15/2009

Kingsley Avenue - Water Main

Drinking Water Revolving Loan Fund Project Water distribution improvements (improve looping and reliability). Project will also include sanitary sewer, storm sewer, roadway and ADA accessible sidewalk construction. Design is well underway. [On DWRF PPL List, not funded] 6/15/2009

City of St. Joseph

Intake & Low Service Pump Station

Drinking Water Revolving Load Fund Project Construct new intake and low service pump station to address the highest priority MDEQ concern at the St. Joseph Water Treatment Plant as per the 2007 Sanitary Survey. Project Plan Estimate was $7,400,000 most recent estimate $11,700,000. Design is well underway. [4th Quarter 2009 DWRF Funding] 7/15/2009

City of St. Joseph City of Sturgis City of Sturgis

City of St. Joseph City of Sturgis City of Sturgis

West Basin Marina Dock & Piling Replacement - Phase II Airport Runway Rehab 6/24 Airport Taxiway Rehabilitation

City of Sturgis

City of Sturgis

Franks Ave. Extension

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

City of St. Joseph

A T

s

t s e

Expected Completion Date

O N

Dock & Piling Replacement Project Grant application has been submitted to MDNR due to poor condition of docks and pilings - considered to be in emergency status by consulting engineer. Construction can not commence until after boating season) Rehabilitate runway 6/24 (3,457' X 75') including rehabilitation of taxiway C Rehabilitate taxiway A and B and also apron (350' X 350') Extend Franks Ave. from Doyle Community Center to Lafayette St. Provides north/south connection from Franks Ave. to Lafayette St.

u q e

$

Morton Ave 361,000 Michigan to Wolcott

$

Marina Drive adjacent to West 501,000 Basin Marina

$

Orchard Ave 682,000 Morton to Langley

9/30/2009

$

Morton Ave - Van 1,088,000 Brunt to Orchard

11/1/2009

$

Kingsley - S. State 1,215,000 to Morton

6/30/2009

11/15/2009

O R

PP

Funding Request

Route (Infrastructure Only)

9/30/2009

D VE

7/1/2011

$

Not Applicable Water Treatment 11,700,000 Plant Project

9/30/2009 6/1/2009 6/1/2009

5/1/2010 11/1/2009 11/1/2009

$ $ $

606,000 Not Applicable 1,055,000 759,500

6/1/2009

11/1/2009

$

1,800,000

12/1/2010

$

2,620,000

R d

e t tt

i m

City of Sturgis

b u S

City of Sturgis, Sherman Township

02262009

M66 Bypass Road Construction

Construction of Haines Boulevard as a three lane, 40-loot wide section with curb and gutter and leaching basins with a T-intersection at Nottawa and Centerville. Dating back to the 1950’s, City Master Plans have called for a reduction in traffic, particularly truck traffic, downtown. M-66/US-12 (Chicago Road) which runs through downtown Sturgis is a major throughway for in-town and out-of-town traffic, including large trucks. The recent construction on US-12, which reduced the number of traffic lanes from four down to three has helped to reduce traffic speeds and create a more pedestrian-friendly environment downtown, but has not addressed the volume of traffic in the area. A long-standing proposal in the City has been to create a bypass of M-66, rerouting truck and other pass-through traffic away from the downtown area. The proposed route takes traffic north on Centerville Road, constructing a connector between North Centerville and North Nottawa near Haines Boulevard. The City has received $750,000 in grant monies from MDOT and is programmed for 2010, however the total project is estimated at $2.8 million.

Submitted Requests - Not Approved

177 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Sturgis

City of Sturgis

DPS Facility Project

For over a decade the City has been discussing the need to construct a new public services facility that would house vehicles and equipment for public works, water, sewer and electric. The current facilities are deteriorated and highly inefficient in terms of function and utilities. The City has received a storm water sustainability grant from the MDEQ, which will assist in paying for site storm water management, a green roof and a wash bay that uses recycled rain water. This grant provides for over $400,000 and the City has earmarked about $1 million. Total project cost is estimated at $2.8 million leaving the project just out of reach. 6/1/2009

City of Sturgis

City of Sturgis

Water Tower Painting (exterior and interior)

Paint exterior and interior of 1,500,000 gallon elevated tank.

Sturges-Young Auditorium parking lot improvement

The Sturges-Young Civic Center and Auditorium is a municipally owned facility that includes a 900 seat auditorium for performing arts and a civic center area utilzed for community events. The project would include resurfacing and expanding the existing parking lot. 5/1/2009

Salt Storage Shed Project

Contruct 3,600 square foot salt shed for storage of winter salt melt. Building consists of asphalt floor, reinforced concrete sidewalls extending 10' feet above finished floor elevation with a steel framed, tensioned fabric cover system. 5/1/2009

Dresser Industrial Park Sewer Project

Extend Sanitary Sewer from the corner of Bogen Rd and South Centerville Rd. east on Bogen road to Nottawa Rd. to service the Industrial park. Extend approximately 2,700 LF of 24” gravity sewer from the corner of M-66(S.Centerville) and Bogen Road east along Bogen to S. Nottawa. Will require the Bore & Jack of casing piping across the existing railroad track on Bogen Road.(S.Centerville) and Bogen Road east along Bogen to S. Nottawa. 6/1/2009

City of Sturgis

City of Sturgis

City of Sturgis

City of Sturgis

City of Sturgis

City of Sturgis, Sturgis Township

City of Swartz Creek

SANITARY SEWER UPGRADES

City of Swartz Creek

City of Swartz Creek

BRIDGE REPLACEMENT

City of Swartz Creek

City of Swartz Creek

WATERMAIN UPGRADES

City of Tecumseh City of Tecumseh City of Tecumseh City of Tecumseh

City City City City

Non-motorized Trail Salt Storage Building Tecumseh Business &Tech park Traffic signal upgrade

Replace 12" watermain along Miller Road from Third Street to Dye Road (14,000'); Replace 10" watermain along Morrish Road from I-69 to Miller (2,800') 12ft bituminus foot trail along M-50 from the Tecumseh Business and Technology Campus,west to the Tecumseh Community Center Required to meet MDEQ Clean Water Initiative Roads and Infrastrure of 55 acres. To be development ready Upgrade traffic signals with LEDs to improve electrical efficiency

City of Tecumseh

City

HVAC for TCA

Upgrade HVAC system for Tecumseh Center for the Arts to improve energy efficiency

m b u

02262009

S

6/1/2009

$

100,000

7/1/2009

$

250,000

11/9/2009

$

916,690

11/1/2009

$

1,081,990

7/1/2009

$

240,000

11/1/2009

$

1,877,000

8/31/2016

$

4,700,000

11/30/2009

$

650,000

7/20/2009

11/30/2009

$

2,100,000

8/9/2009 8/9/2009 6/9/2009 4/9/2009

11/9/2009 11/9/2009 12/9/2009 5/9/2009

$ $ $ $

110,000 250,000 2,250,000 23,000

$

150,000

st

City of Swartz Creek

itt

Fawn River Crossing Sewer Project

420,000

N s

City of Sturgis

City of Sturgis

d e t

Dresser Industrial Park Water Project White Elephant Stormwater Detention Basin Expansion

$

P P A

City of Sturgis, Sturgis Township City of Sturgis, Sturgis Township City of Sturgis, Sturgis Township

City of Sturgis

Submitted Requests - Not Approved

D VE

2,800,000

Extend Water from the corner of Bogen Rd and South Centerville Rd. east on Bogen road to Nottawa Rd. to service the Industrial park. Loop up Nottawa Rd. to Fawn River Rd. This proposed project consists of extending water to the corner of Bogen Road and S. Nottawa Street. In accordance with the feasibility study recommendations, the following improvements will be designed: • Extend approximately 5,100 LF of 12” watermain. The connection to the existing watermain would be made on the east side of M-66 across (approximately across from Carter Lumber) and extend south to Bogen Road, then east to the corner of S.Nottawa Street. 6/1/2009 Expand the White Elephant Storm Sewer Detention Basin to alleviate flooding problems in the area. 5/1/2009 Extend Sanitary Sewer to the Indiana State line to service Fawn River Crossing development area near the I80-90 Toll Road 4/1/2009 Rehabilitate the city's gravity sewer system by pipe re-ling; Complete footing drain connections to the city's storm sewer system for 800 homes. 7/20/2009 Remove and Replace Bridge Superstructure on Morrish Road at the Swartz Creek crossing. 7/20/2009

q e R

O R 12/1/2009

Funding Request

$

9/1/2009

T O

e u

Expected Completion Date

11/1/2009

Route (Infrastructure Only)

178 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Tecumseh City of Tecumseh

City of The Village of Douglas

City of The Village of Douglas

City of The Village of Douglas

City of The Village of Douglas

City of The Village of Douglas

City City

City of the Village of Douglas

City of the Village of Douglas

City of the Village of Douglas

City of the Village of Douglas

Project Name

Start Date

Maumee Street ADA Ramps

Rebuild/ Resurfacing project.The work is required for a new company in Tecumseh Replace handicap ramps to meet curent ADA standards

Union Street Storm water Improvements

Union Street Improvements (from the boat launch southerly to the right hand curve): Improvements would include a trunk storm sewer outlet that collects water from the Union Street right-of-way with future connection capabilities from appropriate side streets. The storm sewer would outlet at or near the boat launch. The sanitary sewer would be video inspected to identify potential deficiencies. The boat trailer parking area near the boat launch would also be improved along with drainage collection at the boat pull out area. 8/9/2009

Wall Street Storm water Improvements

Wall Street Improvements (from west of Union Street to Water Street): Improvements would include the installation of tributary storm sewer to be connected to the trunk storm sewer constructed in the Union Street project described above and the currently existing storm sewer in Main Street. The sanitary sewer would be video inspected to identify potential deficiencies. The roadway pavement will get replaced after storm sewer construction with valley gutter added where appropriate for drainage. 8/9/2009

Randolph Street Storm water Improvements

T O

9/9/2009 7/9/2009

O R

P P A

10/10/2009

$ $

500,000 50,000

D VE

Union Street

Wall Street

Randolph Street Improvements (Blue Star Highway to Water Street): Improvements would include a trunk storm sewer from Union Street easterly to Water Street continuing downhill in Water Street to the Jager-Crane County Drain. This trunk sewer would allow future storm sewer connection into it from areas generally south of Randolph Street between Water Street and Union Street. The existing 4” and 6” watermain from Blue Star Highway to Washington Street would be replaced with a new 8” diameter watermain. The sanitary sewer would be video inspected to identify potential deficiencies. The roadway pavement will get replaced after storm sewer and watermain construction with valley gutter added where appropriate for drainage. 8/9/2009

10/10/2009

Randolph Street

Freemont Street Improvements (Ellis Street to Water Street): Improvements would be made to the storm water collection and drainage by appropriate connections to the existing storm sewers that ultimately drain to the recently constructed trunk storm sewer in Center Street. The sanitary sewer would be video inspected to identify potential deficiencies. The roadway pavement will get replaced after storm sewer construction with valley gutter added where appropriate for drainage. 8/9/2009

10/10/2009

Freemont Street

Campbell Road, Golf View Drive & McVea Drive Improvements

Campbell Road, Golf View Drive & McVea Drive Improvements: Improvements would include storm sewer construction and the replacement of the existing 2” and 6” watermains with 8” watermain in portions of Campbell Road as well as ditch improvements at other locations within the project limits. The sanitary sewer would be video inspected to identify potential deficiencies. Roadway reconstruction of Golf View and McVea Drive with partial roadway reconstruction of Campbell over the newly installed watermain and storm sewer. 8/9/2009

10/10/2009

Campbell Road, Golf View Drive & McVea Drive

8/9/2009

10/10/2009

Park Drive

7/1/2009

11/1/2009

N s

t s e

u q e

R d

Freemont Street Storm water Improvements

e t tt

i m

S

City of The Village of Douglas

City of the Village of Douglas

Park Drive Improvements

Park Drive Improvements: Improvements would include the construction of watermain and sanitary sewer from Third Street southerly to the dead end of Park Drive to replace the existing undersized watermain and sewer piping. Roadway improvements would consist of roadway reconstruction with paving and appropriate storm sewers or culverts connected to the Warnock Drain as appropriate.

City of Trenton

Trenton

Westfield Facility Expansion and Renovation

Renovate and expand including a second story addition to the current facility.

02262009

5/9/2009 5/9/2009

Funding Request

Route (Infrastructure Only)

10/10/2009

ub

City of the Village of Douglas

Project Description

Expected Completion Date

Submitted Requests - Not Approved

$

3,700,000

179 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Trenton

Trenton

Project Name

Trenton

City of Trenton

Trenton

New Police and Fire Station Fort Street over CN Railroad Grade Separation

City of Trenton

Trenton

Riverside Hospital Demolition

Trenton

City of Trenton

Trenton

City of Trenton

Trenton

City of Trenton

Trenton

City of Trenton

Trenton

City of Trenton

Trenton

City of Trenton

Trenton

City of Wakefield

City of Wakefield

City of Wakefield

8/1/2009

City of Wakefield

8/1/2010

O R

45,000,000

$

8,000,000

$

26,000,000 M 85 (Fort Street)

$

500,000,000

11/1/2009

$

600,000

9/30/2009

$

1,000,000

7/1/2009

$

1,100,000

11/1/2009

$

1,300,000

11/1/2009

$

1,500,000

10/1/2009

$

1,500,000

The City has completed studies and preliminary design studies and estimates for a project with a totol estimated cost of approximately $75,000. The project will provide for an adjustable lake level outlet control structure which will enable the City to lower lake levels prior to spring melt off. Lowering the lake levels prior to spring melt will help prevent flooding to many homes which are threatened each spring. Flooding in recent years has resulted in millions of dollars being spent in recent years to improve sewer systems in this area, but money has not yet been made available for this project. 8/1/2009

10/1/2009

$

75,000

Road Improvements

The City has identified more than $275,000 in road repair and reconstruction costs. Preliminary studies and estimates detailing the scope of these improvements and the City is in need of funding. 8/1/2009

10/1/2009

$

75,000

Old US-2 Water Booster Pump Station Reconstruction

In a 2006 letter from the MDEQ, it was stated that the Booster Pump Station on Old U.S. 2 was in poor condition and unsafe, because it is a confined space. The MDEQ recommended the facility be replaced. If the City received funding, the Old U.S. 2 booster pump would be replaced with an above ground pump station. The booster pump station is necessary to serve the Plymouth Location residents. 9/1/2009

7/1/2010

$

260,000

s t s

-N

d e tt

it

q e R

Sunday Lake Outlet Flood Control Structure

bm

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

11/1/2009

P P A

8/1/2009

$

1,500,000

e u

u S

8/1/2010

Funding Request

$

T O

City of Wakefield

11/1/2010

Project would require the acquisition of property in an appropriate area of town to service the needs of the community and building a new police and fire station of approximately 20,000 sq ft. 8/1/2009 Project would provide for M85 to overpass the existing CN Rail line. The project would be administered through MDOT. 8/1/2009 Project includes the demolition and site clean-up of the hospital which encompasses over 5 acres on the Detroit River. 5/1/2009

Project would build a new Electric Arc furnace, Melt & Mold shop and various upgrades. The Mill will focus on State of the Art Green technologies and provide JustIn-Time need for raw steel for Defense Logistics Agency and prime contractors. This will be coordinated with the Office of the Secretary of Defense and Defense Logistics Surge and Sustainment Department for Special projects under the "Warstopper Program", specifically pertaining to the Diminishing Manufacturing Sources and DSC former McLouth Steel Plant Re-Opening Material Shortages (DMSMS) program. 4/1/2009 Remove gravel within alleys, replace with concrete pavement and install storm sewer Downtown Alley Paving Project to improve poor drainage areas. 4/1/2009 Removal and replacement of area identified for repair within the City of Trenton Major Major & Local Street Repairs and Local Street system. 4/1/2009 Complete removal and replacement of Harrison Avenue concrete pavement from Fort Harrison Ave. Pavement Repair Street to Grange. 4/1/2009 Pave gravel streets with concrete pavement and install storm sewer to improve poor Paving of Existing Gravel Streets drainage. 4/1/2009 Install new water mains within the City in areas with significant water main breaks and Water Main Replacement areas of low pressure. 5/1/2009 To extend the service life and improve the overall condition of the sanitary sewer Sanitary Sewer Rehabilitation infrastructure, the existing sanitary sewer lines need to be lined. 5/1/2009

City of Wakefield

02262009

Start Date

Project will construct a new 13 MGD capacity water treatment plant, 1 Mgal above ground storage tank, intake pump station from the Detroit River and connecting transmission pipelines to the City of Riverview and Grosse Ile Township.

Water Treatment Plant

City of Trenton

City of Trenton

Project Description

Expected Completion Date

180 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Wakefield

City of Wakefield

Project Name

Project Description

Start Date

Expected Completion Date

Residential Area Yard Drain Installations

This area of work was identified as first priority in the MDEQ S2 SRF Project Plan completed in June 2008 and submitted to MDEQ July 2008. Work in this area is primarily within areas where main line sewers have been replaced within the past 10 years. Work in these areas needs to be done now to reduce the amount of Infiltration/Inflow (I/I) that enters the collection system by seeping through basement walls or leaking into defective laterals. Flow metering performed in this area verified elevated sewer flows during wet weather events and confirms observations of the City’s operators. The flow meter data and observations in this area during wet conditions indicates that this area is at or nearly at capacity and flow to the City’s Main Lift Station is much greater than would be expected based upon the served population. In order to reduce this flow, a combined approach of establishing yard drainage to storm sewers, disconnecting foundation drains, re-plumbing basement sanitary piping and installing basement sump pumps is proposed. 9/1/2009

City of Wakefield

Plymouth Location Elevated Water Storage Tank

Dixon Engineering inspected the Plymouth Location water tank in the Spring of 2008. Because the repairs that were addressed in the Dixon report are cost prohibitive, Dixon Engineering recommended that the water tank be replaced with a 100,000 gallon elevated tank. It is imperative that the City replace the water tank to provide adequate service to the Plymouth Location residents, which includes the Gogebic Medical Care Facility, the home of 109 elderly individuals. 8/1/2009

City of Wakefield

This work was identified as third priority in the MDEQ S2 SRF Project Plan completed in June 2008 and submitted to MDEQ July 2008. Work in this area will significantly reduce the amount of sanitary wastewater that is discharged at the diversion manholes at the Sunday Lake and Charles Street intersections. Once this work is done, sanitary wastewater from the Tobin Location will be able to directly connect to the separated sanitary sewers downstream of the diversion manhole on Sunday Lake Street without being mixed with excessive clear water flows from upstream of this diversion manhole. Accomplishing this work should result in a significant decrease in the amount of clear water entering the sanitary sewer collection system which is Tobin Location Sanitary Sewer Replacement estimated to be 1.85 million gallons per day (MGD) of clear water flow. 9/1/2009

P P A

O R

Funding Request

D VE

10/1/2010

$

312,000

6/1/2010

$

500,000

10/1/2010

$

742,000

City of Wakefield

Bedell Street Sanitary Sewer Replacement

This work was identified as second priority in the MDEQ S2 SRF Project Plan completed in June 2008 and submitted to MDEQ July 2008. This work entails the construction of new sanitary sewers with improvements to private laterals and interior plumbing including disconnecting foundation drains and re-plumbing basement sanitary piping with the installation of sump pumps is recommended for this area. It is also recommended that the existing buried piping in this area be converted to a storm water collection system and an outlet for it created by extending it eastward to an existing ditch. Accomplishing this work should result in a significant decrease in the amount of clear water entering the sanitary sewer collection system which is estimated to be 0.15 million gallons per day (MGD) of clear water flow. 9/1/2009

10/1/2010

$

1,120,000

City of Wakefield

This work was identified as fourth priority in the MDEQ S2 SRF Project Plan completed in June 2008 and submitted to MDEQ July 2008. The most significant amount of improvement that needs to be made in any one area or the City in order to reduce the amount of I/I and volume of SSOs, needs to be accomplished in this area. Accomplishing this work should result in a significant decrease in the amount of clear water entering the sanitary sewer collection system which is estimated to be 3.0 9/1/2009 Castile Location Sanitary Sewer Replacement million gallons per day (MGD) of clear water flow.

10/1/2010

$

1,705,000

City of Wakefield

T O

s t s

-N

Route (Infrastructure Only)

e u

City of Wakefield

d e tt

t i m

City of Wakefield

City of Wakefield

b u S

02262009

q e R

Submitted Requests - Not Approved

181 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Walker, City of Grand Rapids Utility District

Project Name

Project Description

Expected Completion Date

Start Date As soon as funding is available

Four Mile Road Water Tank

Construct a 500,000 gallon water tank in northern Walker to supplement supply and fire supression in the area north of I-96 and south of Four Mile.

City of Walker

City of Walker, City of Grand Rapids Utility District

South Walker Water II

Build 1.5 miles of 16" watermain to tie in water system to Grand Rapids ground storage tank. This will improve system reliability and bring public water to residential neighbors with poor well water quality. It will also make water available to the Millennium Commerce Park, a state designated brownfield. Development can not take place without public water on this old landfill (Fenske Landfill). 8/1/2009

City of Walker

City of Walker, City of Grand Rapids Utility District

Four Mile Road Watermain

Construct a 16" watermain to tie in new water tank between Fruitridge and Bristol

M-140

Water service replacement due to rehabilitation of M-140 (by MDOT in 2010) through the City including the downtown commercial district. As part of this project, there would be in excess of 30+ water service(s) that would be replaced supplying the downtown commercial district. The services are very old with a number that are lead services. Replacement of the water service(s) is being done ahead of the rehabilitation of M-140 so the City does not have to "after the fact" tear-up the work 5/12009 subject completed by the MDOT on the newly done roadway. to funding

Medical Drive

City of Walker

City of Watervliet

City of Watervliet

City of Wayne

City of Wayne

City of Wayne

City of Wayne

City of Wayne

City of Watervliet

City of Watervliet

City of Wayne

City of Wayne

Second St. Repaving

D VE $

12 months total

$

Four Mile Road 3,500,000 east of Fruitridge

9/1/2009

$

M140 & Red Arrow 125,000 Hwy.

The City is home to an award winning regional serving community public hospital. The project would entail redevelopment of the ingress/egress and drive off of Red Arrow 3/1/2009--subject Hwy. (including storm retention) to the hospital proper. to funding 9/1/2009

$

570,000 Red Arrow Hwy.

$

Newburgh – Glenwood to 800,000 Michigan Ave

N s

st

Deficient concrete pavement removal and replacement

e u

q e R

8/1/2009

O R

P P A

City of Wayne

Elizabeth Street Repaving

City of Wayne

Watermain and concrete replacement Phase X Watermain replacement and deficient concrete pavement removal and replacement

itt

Four Mile Road 2,000,000 east of Fruitridge

12 months total

Deficient concrete pavement removal and replacement

d e t

$

Wilson from Riverbend south to Millennium Commerce Park 1,800,000 (Grand River)

T O

Newburgh Road Repaving

12 months total

Funding Request

Route (Infrastructure Only)

Deficient concrete pavement removal and replacement

5/15/2009

5/15/2010

5/15/2010

10/15/2009

10/15/2010

10/15/2010

$

Elizabeth – Glenwood to 2,000,000 Annapolis

$

Hubbard, Mildred, Winifred, and 2,600,000 Niagara Sts

$

Annapolis – Elizabeth to 3,000,000 Merriman

City of Wayne

City of Wayne

Watermain and concrete replacement Phase IX Watermain replacement and deficient concrete pavement removal and replacement

5/15/2009

10/15/2009

$

Hubbard, Mildred, Winifred, and 3,100,000 Niagara Sts

City of Wayne

City of Wayne

Sliplining Phase XI

Lining of old/deficient sanitary sewer

5/15/2009

10/15/2011

$

Streets throughout 14,000,000 the city

James St. Area Infrastructure Upgrades

The City of White Cloud in the County Seat for Newaygo County. The County is working on an expansion of the County Jail. This would require the City to expand sewer and water to the site and also require upgrades to the roads to serve the facility 6/9/2009

6/10/2009

$

North St. and 1,000,000 William St.

City of White Cloud Industrial Water Loop

The City of White Cloud Industrial Park needs to add a loop to the water line that serves the park. This is necessary to add redundancy in the event that there would be a disruption in the current line due to a break or other cause. This redundant line would also add to the marketability of the park for future tenants. 5/1/2009

10/1/2009

$

1,000,000

City of White Cloud

City of White Cloud

City of White Cloud

City of White Cloud

02262009

Submitted Requests - Not Approved

10/15/2009

$

Second – Glenwood to 2,000,000 Annapolis

Annapolis Repaving

S

5/15/2009

10/15/2010

City of Wayne

m b u

Deficient concrete pavement removal and replacement

5/15/2010

182 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of White Cloud

City of White Cloud

Water System Improvement

Water System improvements from the north end of Webster St. to east end of Washington St. in Industrial Park by placing 1200 feet of 12inch watermain plus 200 ft bored and jacked

City of White Cloud

City of White Cloud

Industrial Park Water Main Loop

To loop the Industrial Park water main with instillation of 12 inch watermain

City of White Cloud City of White Cloud

City of White Cloud City of White Cloud

City of White Cloud City of Whitehall City of Whitehall City of Whitehall

Township City of Whitehall City of Whitehall City of Whitehall

City of Williamston

City of Williamston

Road and utilities improvements to James Street 1,500 ft from M-37 to North Street, Williams Street 500 ft from James St to Newell Street and Williams Street 900 ft from James, Williams & North Street Improvement James St to Wilcox Ave. City of White Cloud Master Plan A full rewrite of the Cities Master Plan current Expansion to the White Cloud Sewer Authority facility to accommodate disposal of White Cloud Sherman Sewer Expansion private septic haulers waste. Pump Station #2 Rehabilitation Mears Avenue Improvements Lake St. and Misco Dr. Improvements restructuring three wells to raise them above the flood plain for health concerns during flooding Summer 2010 Water System Improvements

City of Williamston

City of Williamston

reconstruction of WWTP influent structure

wastewater treatment plant influent structure rebuilding

City of Williamston City of Williamston City of Williamston

City of Williamston City of Williamston City of Williamston

DPW Garage Community Center Improvements Water Treatment Plant

New construction of Public Works Building for health, safety and energy efficiency building rehabilitation to include energy efficiency improvements construction of water treatment plant for improvement of water quality

DDA Streetscape & water main

Streetscape improvements including sidewalks, energy efficient street lighting, trash cans, benches, water main replacement

City of Williamston

City of Williamston City of Williamston City of Williamston

City of Williamston

City of Williamston City of Williamston City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Williamston

City of Wixom

Middle Street Parking Lot Williamston Road resurfacing Putnam St.,/High St Parking Lot

City of Wixom

02262009

N s

Parking lot expansion and improvements in downtown district mill & resurface Williamston Rd from I-96 to Linn Rd construction of parking lot with amenities in Downtown Distric

q e R

install pedestrian sidewalks for non-motorized transportation in highly developed neighborhoods replacement of sanitary sewer under Red Cedar River from Brookshire Golf Club to Sanitary Sewer River Crossing Replacement WWTP Influent Structure

t i m

south side sidewalks

90 days from start

$

100,000 Industrial Park area White Cloud 5,500,000 Industrial Park

D VE $

Around County 750,000 Complex 7,000

$ $ $ $

60,000 200,000 300,000 800,000

Summer 2010

$

1,000,000

Summer 2010

Summer 2010

$

1,000,000

Summer 2010 Summer 2010 Summer 2010

Summer 2010 Summer 2010 Summer 2010

$ $ $

1,500,000 3,000,000 3,500,000

5/1/2009

6/1/2009 6/1/2009 6/1/2009

12/31/2009 120 days from start 12/9/2009 12/9/2009 12/9/2009

O R

8/1/2009

8/1/2009 6/1/2009 8/1/2009

$

Putnam St from Middle St N to alley 850,000 (water main)

$ $ $

storm drainage from 1/2 block e of 160,000 Putnam to Putnam 200,000 250,000

5/1/2009

8/1/2009

$

N Williamston Rd from Wallace St to Linn Rd, Wallace & Lloyd Sts from Wmstn Rd to end, 280,000 Georgia St

7/9/2009

9/1/2009

$

450,000

N Side Water Main Upgrades

replace undersized water mains (2") for fire flow

6/1/2009

8/1/2009

$

Elevator Street (Industrial Park)

build roadway in Industrial Park including sanitary, storm and water

7/1/2009

10/1/2009

$

Putnam St to Bismark, McCauley, Fuller, 550,000 Irving Sanitary, storm, 700,000 water & street

Industrial Park Roadway

water, sanitary, storm & street to connect improve industrial park, allow better traffic flow and safety

$

Centurion Way to Industrial Park 800,000 Drive

Downtown Street Lighting Energy Improvements

Replace inefficient street lighting in the downtown business district with efficient light emitting diode (LED) technology and synchronize system sub-units. Project will reduce energy consumption and costs by 40-50%.

$

153,750

ub

S

City of Williamston

d e tt

T O

190 days from start

Funding Request

Route (Infrastructure Only)

$ $

P P A

st

e u

Expected Completion Date

Submitted Requests - Not Approved

4/1/2009

8/1/2009

183 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

Project Name

Project Description

Start Date

West Maple Reconstruction

1st Quarter 2010 3rd Quarter 2011

$

850,000

Wastewater Treatment Plant Effluent Disinfection System Improvements

Replace obsolete effluent disinfection system with a state of the art ultraviolet light disinfection technology. Project will enhance effluent quality and reduce energy consumption and operational costs.

1st Quarter 2009 3rd Quarter 2009

$

500,000

Potter Road Safety Path

Construct a safety path, for non-motorized transportation uses, along Potter Road from Beck Road to Wixom Road. Project will provide facilities for the use of nonmotorized vehicles and promote physical fitness.

$

315,630

City of Wixom

Downtown Street Lighting Energy Improvements

Replace inefficient street lighting in the downtown business district with efficient light emitting diode (LED) technology and synchronize system sub-units. Project will reduce energy consumption and costs by 40-50%. 2nd Quarter 2009 3rd Quarter 2009

City of Wixom

Wastewater Treatment Plant Effluent Disinfection System Improvements

Replace obsolete effluent disinfection system with a state of the art ultraviolet light disinfection technology. Project will enhance effluent quality and reduce energy consumption and operational costs.

West Maple Reconstruction

Reconstruction of West Maple Road from Wixom to the west City limits. The current road is rated in poor to very poor utilizing the nationally recognized PASER System. Project will reduce fuel consumption and vehicle repair costs.

$

750,000

$

275,000

$

12,000,000

$

500,000

City of Wixom

City of Wixom

City of Wixom

City of Wixom

T O

-N

City of Wixom

Potter Road Safety Path

City of Wixom

City of Wixom

Reconstruct And Pave City Hall Parking Lot

City of Wixom

City of Wixom

Reconstruct And Pave City Hall Parking Lot

Historic Spencer Barn Preservation Initiative

Acquisition and relocation of 1840's era historic Wixom Barn. Effort will culminate in the further development of the historic Wixom Gibson Farm and agricultural interpretative center

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

02262009

q e R

4th Quarter 2009 4th Quarter 2009 2nd Quarter 2009 3rd Quarter 2009 2nd Quarter 2009 3rd Quarter 2009

2nd Quarter 2009 4th Quarter 2009

d e t

Acquisition and relocation of 1840's era historic Wixom Barn. Effort will culminate in the further development of the historic Wixom Gibson Farm and agricultural Historic Spencer Barn Preservation Initiative interpretative center 2nd Quarter 2009 4th Quarter 2009 Gilbert Willis and Gunnar Mettala Park Paving Pave the access drive and parking lots for two of the City's largest parks that are Improvements commonly utilized for community events and public gatherings. 4th Quarter 2009 4th Quarter 2009

tt i m

12 Mile Road Extension

Construction of a concrete roadway from Beck Road to the existing roadway system in Alpha Tech Corporate Park providing a connection to Wixom Road thereby providing a significant east-west connection within the City and facilitating infill development.

Community Center Expansion/Renovation

Expansion and renovation of the current Wixom Community Center for the purpose of providing activity areas for senior citizens and the general public. Project will promote physical activity and community events. 4th Quarter 2009 4th Quarter 2010

$

1,250,000

Construction of a second water main crossing of I-96. Currently the system is served by one crossing. A second/emergency connection is needed in the event of a 1st Quarter 2010 3rd Quarter 2011 Secondary/Emergency Water Main Extension calamity and to provide consistency.

$

550,000

ub

S

City of Wixom

e u

1st Quarter 2009 3rd Quarter 2009

Construction of a concrete roadway from Beck Road to the existing roadway system in Alpha Tech Corporate Park providing a connection to Wixom Road thereby providing a significant east-west connection within the City and facilitating infill 12 Mile Road Extension development. 4th Quarter 2009 4th Quarter 2009 Gilbert Willis and Gunnar Mettala Park Paving Pave the access drive and parking lots for two of the City's largest parks that are Improvements commonly utilized for community events and public gatherings. 4th Quarter 2009 4th Quarter 2009

City of Wixom

City of Wixom

s t s

O R

D VE

Route (Infrastructure Only)

P P A

City of Wixom

City of Wixom

Funding Request

Reconstruction of West Maple Road from Wixom to the west City limits. The current road is rated in poor to very poor utilizing the nationally recognized PASER System. Project will reduce fuel consumption and vehicle repair costs.

Construct a safety path, for non-motorized transportation uses, along Potter Road from Beck Road to Wixom Road. Project will provide facilities for the use of nonmotorized vehicles and promote physical fitness. Reconstruct and pave City Hall parking lot including base repairs and drainage improvements using best storm water management practices Reconstruct and pave City Hall parking lot including base repairs and drainage improvements using best storm water management practices

City of Wixom

Expected Completion Date

Submitted Requests - Not Approved

184 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Landrow Road Extension

Construction of a new concrete road from Pontiac Trail to Maple Road to provide a significant north-south connection within the City. Project will increase capacity, traffic efficiencies and reduce delays for the City and our surrounding communities.

Wixom Road Reconstruction

Construction of a concrete boulevard from the I-96 interchange to Old Wixom Road at the Village Center Area promoting access from the nearest highway into the commercial area of the City including the future redevelopment of the old Ford-Wixom Assembly Plant property. 1st Quarter 2010 3rd Quarter 2011

City of Wixom

Wixom Habitat Pathway Project

Expansion and extension of the existing Habitat pathway through Wixom's Habitat Park, a 297 acre nature preserve. Project will provide access to natural areas for educational purposes and recreational nature viewing.

City of Wixom

Install a new mechanical influent screening system to improve debris removal. Wastewater Treatment Plant Debris Removal Project will improve efficiency of plant and reduce energy consumption and System Improvements. operational costs.

City of Wixom

City of Wixom

Wastewater Treatment Plant Solid Handling System Improvements

City of Wixom

City of Wixom

Wastewater Treatment Plant Instrumentation Replacement of obsolete instrumentation and control systems with new state of the and System Control Improvements art programmable logic controllers for all areas and operations of the WWTP

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

$

12,000,000

$

29,000,000

$

300,000

$

2,000,000

$

3,000,000

4th Quarter 2009 4th Quarter 2010

$

600,000

The City of Wixom WWTP, pursuant to an Agreement with Milford Twp., serves a substantial portion of Milford Township. Additional capacity in the WWTP is needed to meet the demands of the service area. Improvements include: a new influent force main, aeration channel aerator replacements, and additional secondary clarifier, and Wastewater Treatment Plant Milford Township additional biological sludge storage tank, and disinfection system upgrades. Through Service Sharing Upgrades this Agreement, ground and surface waters will be protected. 4th Quarter 2009 4th Quarter 2010

$

3,000,000

$

20,000,000

A T

t s e

O N

u q e

Construction of a concrete roadway from the I-96 interchange north to West Road. Beck Road provides access to the City's office light industrial areas to the north of I96 and to the new Providence-St. Johns hospital complex to the south increasing connectivity within the Beck Road corridor. Project will also reduce traffic delays thereby reducing fuel consumption.

R d

Community Center Expansion/Renovation

City of Wixom

Install a new mechanical influent screening system to improve debris removal. Wastewater Treatment Plant Debris Removal Project will improve efficiency of plant and reduce energy consumption and System Improvements operational costs.

i m

2nd Quarter 2010 3rd Quarter 2011

Expansion and renovation of the current Wixom Community Center for the purpose of providing activity areas for senior citizens and the general public. Project will promote physical activity and community events. 4th Quarter 2009 4th Quarter 2010

City of Wixom

e t tt

PP

4th Quarter 2009 1st Quarter 2011

Replacement of aerobic digester components, addition of a new digester and sludge dewatering equipment, and various system replacements, improvements, and additions. Project will reduce energy consumption and operational costs. 4th Quarter 2009 4th Quarter 2010

s

Beck Road Reconstruction

O R

D VE

4th Quarter 2009 1st Quarter 2011

Replacement of aerobic digester components, addition of a new digester and sludge dewatering equipment, and various system replacements, improvements, and additions. Project will reduce energy consumption and operational costs. 4th Quarter 2009 4th Quarter 2010

City of Wixom

City of Wixom

Wastewater Treatment Plant Solid Handling System Improvements

City of Wixom

City of Wixom

Wastewater Treatment Plant Instrumentation Replacement of obsolete instrumentation and control systems with new state of the and System Control Improvements art programmable logic controllers for all areas and operations of the WWTP

City of Wixom

The City of Wixom WWTP, pursuant to an Agreement with Milford Twp., serves a substantial portion of Milford Township. Additional capacity in the WWTP is needed to meet the demands of the service area. Improvements include: a new influent force main, aeration channel aerator replacements, and additional secondary clarifier, and Wastewater Treatment Plant Milford Township additional biological sludge storage tank, and disinfection system upgrades. Through this Agreement, ground and surface waters will be protected. 4th Quarter 2009 4th Quarter 2010 Service Sharing Upgrades

City of Wixom

b u S

02262009

Funding Request

Route (Infrastructure Only)

Submitted Requests - Not Approved

4th Quarter 2009 4th Quarter 2010

185 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wixom

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

Start Date

Wixom Habitat Pathway Project

Expansion and extension of the existing Habitat pathway through Wixom's Habitat Park, a 297 acre nature preserve. Project will provide access to natural areas for educational purposes and recreational nature viewing.

Landrow Road Extension

Construction of a new concrete road from Pontiac Trail to Maple Road to provide a significant north-south connection within the City. Project will increase capacity, traffic efficiencies and reduce delays for the City and our surrounding communities. 4th Quarter 2009 3rd Quarter 2011

Beck Road Reconstruction

Construction of a concrete roadway from the I-96 interchange north to West Road. Beck Road provides access to the City's office light industrial areas to the north of I96 and to the new Providence-St. Johns hospital complex to the south increasing connectivity within the Beck Road corridor. Project will also reduce traffic delays thereby reducing fuel consumption.

Funding Request

O R

P P A

T O

-N

Installation of an emissions reduction system at the Wyandotte Municipal power plant. 6/1/2009 Replace the current fleet of city-owned Municipal Services automobiles with Hybrid Vehicles. 3/1/2009

2/1/2010

$

7/1/2009

$

4/30/2009

$

1,380,000 N/A

9/1/2009

$

1,860,000 N/A

2/1/2009

4/1/2009

$

175,000 N/A

Roof replacement, solar panel and wind turbine installation at city-owned building. 3/1/2009 Provide site paving and new covered storage bins at the Department of Public Services site. 5/1/2009 Upgrades to HVAC, lighting and fire protection at City Hall. Installation of new roof & solar panels at City Hall. 2/1/2009

6/1/2009

$

605,000 N/A

9/30/2009

$

750,000 N/A

5/1/2009

$

1,280,000 N/A

PH I - 3/1/2009 PH 2 - 9/1/2099

PH 1- 9/30/2009 PH 2 - 12/31/2010 $

1,850,000 N/A

5/1/2009

10/1/2009

$

940,000 N/A

5/30/2010

$

350,000 N/A

8/31/2010

$

395,000 N/A

Dredge the Detroit River at the Wyandotte Municipal Docks to allow full shipments of coal to be delivered to the power plant. Project would also allow for remediation of Dredging of River at Municipal Service Docks contaminants in the river. 3/1/2009 Replacement of High-Pressure Sodium Replace High Pressure Sodium street lights, pedestrian lights and security light Lighting w/LED fixtures throughout the city with LED lighting. 3/1/2009

Wyandotte

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

Upgrades to DPS Site City Hall Systems Upgrades & Solar Panel Installation

City of Wyandotte

Wyandotte

Wyandotte Masonic Lodge Arts Center

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

City of Wyandotte

Wyandotte

City of Wyandotte City of Wyandotte

Wyandotte Wyandotte

City of Wyandotte

Wyandotte

itt

m b u

Municipal Services Electrical Upgrades

e u

Restoration of Historic Masonic Lodge building & creation of community arts center. Upgrades to the existing Municipal Services electrical system to meet increasing consumer demand

6,756,000 N/A 400,000

Parking Lot Reconstruction

Completion of downtown streetscape project to add pedestrian lighting, expanded sidewalks to further support a walkable downtown business district. 8/1/2009 Reconstruct several city-owned parking lots throughout the city. These lots are used for snow-emergency parking, schools and special events. 4/1/2010

Sanitary Sewer Replacement and Upgrades Water Main Replacement & Upgrades

Replacement, repair and upgrading of sanitary sewer lines throughout the city. Replacement, repair and upgrading of water mains throughout the city

8/1/2009 3/1/2009

9/30/2010 6/30/2010

$ $

1,061,800 N/A 1,900,000 N/A

Street Reconstruction, Repair & Resurfacing

Repair, resurfacing & reconstruction of various streets throughout the city.

3/1/2009

6/30/2010

$

3,327,000 Various

Downtown Streetscape Project

S

s t s

Implementation of the 2007 Energy Audit, which identified several cost-saving opportunities through the application of efficient technologies in city facilities.

q e R

Implementation of 2007 Energy Audit Roof Replacement & Solar Panel Installation at City-Owned Building

d e t

D VE

4th Quarter 2009 4th Quarter 2009

Construction of a concrete boulevard from the I-96 interchange to Old Wixom Road at the Village Center Area promoting access from the nearest highway into the commercial area of the City including the future redevelopment of the old Ford-Wixom Assembly Plant property.

Wixom Road Reconstruction Municipal Services Power Plant Emission Reduction Municipal Services Hybrid Vehicle Replacement

City of Wyandotte

02262009

Project Description

Route (Infrastructure Only)

Construction of a second water main crossing of I-96. Currently the system is served by one crossing. A second/emergency connection is needed in the event of a Secondary/Emergency Water Main Extension calamity and to provide consistency. 1st Quarter 2010 3rd Quarter 2011

City of Wixom

City of Wixom

Project Name

Expected Completion Date

Submitted Requests - Not Approved

186 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming

Project Name

Project Description

Start Date

Expected Completion Date

Sanitary Sewer Sliplining

The existing sanitary sewer system has a number of isolated pipe segments which are in need of repair. This project would involve the internal repair of these pipe segments so as to avoid possible pipe collapse. 5/9/2009

10/9/2009

Watermain Replacement

The existing water distribution system has a number of pipe segments which have experienced pipe failures and associateedd service disruptions. Three of these segments, located in Avon and Meyer Avenues, can be constructed in 2009

10/9/2009

Raw Water Line and Carbon Feed Facility

The existing water treatment plant services approximately 200,000 customers in Kent and Ottawa Counties. The plant has one raw water line which transports water approximately one mile from Lake Michigan to the plant. Plans are being prepared to construct a parallel 66-inch diameter pipeline, with an associated carbon feed facilitym to provide the necessary security and reliability that a second raw water pipeline will provide to the entire water system.

Wyoming - Holland Water Interconnect

The existing water treatment plant services approximately 200,000 customers in Kent and Ottawa Counties. Wyoming and Holland are planning to construct a 30-inch diameter interconnection pipeline to provide additional reliability and securety for both systems.

Odor Control - Primary Clarifier Tank Covers

This project will conclude a comprehensive odor control project that began in early 2001 at the City of Wyoming’s wastewater plant. This project will enhance the neighborhood environment surrounding the area of the plant and create jobs for the engineering, procurement, installation and final commissioning of the odor scrubbing components of the new system. 5/9/2009

Centrifuge Procurement

This capital investment will enhance reliability and add redundancy by providing a third centrifuge for solids control of the activated sludge process at the wastewater plant. This third unit will be placed into a rotation of usage and allow for service of the existing units. This enhancement in reliability will create several opportunities for employment in the engineering, procurement and installation of this third centrifuge unit. 7/9/2009

T O

5/9/2009

O R

Funding Request

D VE

P P A

N s

10/9/2009

$

2,500,000

10/9/2009

$

1,000,000

This project includes the installation of an ultraviolet disinfection system that will replace an existing gaseous chlorine feed system. The USEPA, the MDEQ and the Department of Homeland Security have all expressed concerns about the use of gaseous chlorine for disinfection purposes and are providing guidance and decision making tools to local utility owners to encourage movement to less hazardous disinfection technologies such as ultraviolet light. In addition to eliminating the security risk of chlorine and sulfur dioxide, the overall safety risk to the plant staff and surrounding community is also greatly reduced. The engineering, procurement, construction and commissioning of this new system will create several employment opportunities. 7/10/2009

7/11/2009

$

7,500,000

Howard Miller Library Energy Conservation

Upgrade All Existing Computerized Energy Management Software

7/1/2009

12/31/2009

$

3,000

Roosevelt Fire Station Energy Conservation

Remove Aging Roof Top DX Air Conditioner and Install New High Efficiency Unit Install Fiber Optic Loop For Internet Access for Computerized Energy Management System Capability

7/1/2009

12/31/2009

$

6,000

7/1/2009

12/31/2009

$

7,000

7/1/2009

12/31/2009

$

9,000

d e tt

t i m

UV Disinfection Project

t s e

qu

e R

City of Wyoming

City of Wyoming

City of Zeeland

City of Zeeland

City of Zeeland

City of Zeeland

City of Zeeland

City of Zeeland

City of Zeeland

City of Zeeland

Public Safety Building Energy Conservation

City of Zeeland

City of Zeeland

Roosevelt Fire Station Energy Conservation

Install high efficiency flourescent lighting and motion sensors for control in all areas Remove Existing Exterior Windows, Partially Close Existing Openings and Install Thermal Window Units

7/1/2009

6/30/2010

$

9,000

City of Zeeland

City of Zeeland

Howard Miller Library Energy Conservation

Repair and Rebuild All Variable Air Volume Systems for HVAC efficiency and Balance 7/1/2009

6/30/2010

$

10,000

S

ub

02262009

Roosevelt Fire Station Energy Conservation

Submitted Requests - Not Approved

Route (Infrastructure Only)

187 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Zeeland

City of Zeeland

Public Safety Building Energy Conservation

City of Zeeland

City of Zeeland

Roosevelt Fire Station Energy Conservation

City of Zeeland

City of Zeeland

Public Safety Building Energy Conservation

City of Zeeland City of Zeeland

City of Zeeland City of Zeeland

Howard Miller Library Energy Conservation Valley Lift Station Upgrade

Project Description Re Configure Existing Air Duct System to Accommodate Energy Management System Design Install Computerized Energy Management System and all Applicable Controls Tech Support Install Computerized Energy Management System and all Applicable Controls Tech Support Replace Two Aging 40 Ton Air Conditioning Compressors and All Controls With High Efficiency Units and Updated Controls and Sensors Upgrade of pumps and controls for more capacity

City of Zeeland City of Zeeland City of Zeeland City of Zeeland City of Zeeland City of Zeeland Zeeland BPW

Howard Miller Building Renovation Paw Paw Pavilion Construct. Howard Miller Library Repairs Lawrence Park Bowl Project Central Ave. Sanitary Sewer Clean Water Plant Upgrade Central Ave. Watermain

Renovate building to expand Children's Area into Conference Room, upgrade rooms in basement to replace Conference Room, replace carpet and complete other modifications to building. Construction of a Outdoor Pavilion Repairs to Exterior Façade of Howard Miller Library Reconstruction of Outdoor Amphitheater Replace existing sewer Upgrade of the City's Clean Water Plant Replace Watermain

City of Zilwaukee

To install Sanitary Sewer Service on these two roads to allow businesses to locate in Westervelt Road & Adams St. Sanitary Sewer the only areas left large enough and with zoning for businesses but with no Extension infrastructure, it makes it difficult for our little community to provide these services. 6/1/2009

City of Zeeland City of Zeeland City of Zeeland City of Zeeland City of Zeeland City of Zeeland City of Zeeland

City of Zilwaukee

Project Name

T O

s t s

Start Date

Expected Completion Date

Funding Request

7/1/2009

12/31/2009

$

10,000

7/1/2009

12/31/2009

$

15,000

7/1/2009

12/31/2009

$

28,000

7/1/2009 7/1/2009

6/30/2010 11/1/2009

$ $

50,000 200,000

10/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 6/1/2010 7/1/2009

$ $ $ $ $ $ $

310,000 25,000 80,000 250,000 286,000 4,500,000 400,000

12/15/2009

$

731,700

11/30/2011

$

3,000,000

12/15/2009

$

731,700

7/1/2009 3/1/2009 3/1/2009 3/1/2009 3/1/2009 4/1/2009 3/1/2009

P P A

O R

-N

A separate storm sewer system to allow for the disconnection of storm water from the sanitary sewer and to pickup groundwater is required in order to eliminate the inflow that is causing inflow and infiltration of rainwater into the Sanitary Sewer system. This causes basement flooding and excessive flow to the City of Saginaw Wastewater Treatment Plant. The flooding during storm events and increased volume of untreated waste water that is required to go to the city of Saginaw wastewater treatment plant has to be corrected. All the storm water that is treated as wastewater is costly and requires us to spend $1000s of dollars a year to treat uncontaminated water as wastewater. With only 1799 residents this project is too much of a burden on our small community. We have already nearly doubled our sewer commodity rates which are a hardship on our people. We just went from $2.79 per 1,000 gallons to $5.50 per 1,000 gallons. We need help badly. 6/22/2009

D VE

Route (Infrastructure Only)

e u

City of Zilwaukee

q e R

City of Zilwaukee

City of Zilwaukee weep Tile Disconnect and Sanitary Sewer Service Lead Improvement Project

itt

d e t

City of Zilwaukee TIFA City of Zilwaukee

To install Sanitary Sewer Service on these two roads to allow businesses to locate in Westervelt Road & Adams St. Sanitary Sewer the only areas left large enough and with zoning for businesses but with no Extension infrastructure, it makes it difficult for our little community to provide these services. 6/1/2009

m b u

S 02262009

Submitted Requests - Not Approved

188 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City Opera House Heritage Association

Traverse City

Project Name

Project Description

Start Date

City Opera House Phase III Renovation

This is the third and final phase of a comprehensive renovation of the 750 seat Victorian era City Opera House located in downtown Traverse City, Michigan. Construction documents have been completed for Phase III, ready for immediate construction. The Opera House serves as a multi-use community space including performing arts, music, banquets and weddings. Phase I and II involved both public and private funds during a seven-year 8.3 million restoration and upgrade completed in 2006. Major upgrades included; structural, mechanical, electrical, life safety and accessibility upgrades in the three story structure. Scope remaining as part of Phase III include: recreating historic decorative painting in the auditorium, balcony and lobby, Auditorium chandelier, installation of a decorative acoustical ceiling and woodwork in the lobby including a concessions counter, fitting out the third floor restrooms and backstage dressing rooms, sound booth and stage lighting equipment, catering kitchen equipment and exterior masonry cleaning and pointing. Sustainable features include; use of regional materials and labor ,energy conserving lighting fixtures, plumb60 days

Expansion of Clara B. Ford and Vista Meadows Academies

Clara B. Ford (CBF) and Vista Meadows (VMA) Academies, located on the campus of Vista Maria, are alternative junior and senior high schools designed to meet the complex needs of economically disadvantaged children and their families. Many of ou students are 1 to 3 grade levels behind, have already dropped out of school, or are at great risk for not completing their high school diploma. Both academies provide individualized instruction using a nationally recognized credit recovery model (PLATO); small student/teacher ratio; clearly stated mission and program purpose; caring faculty with continual staff development; high expectations for students; and total commitment to student success. Vista Maria will expand the capacity to educate an additional 250-280 students at CBF and VMA through a combination of new construction and renovation projects. Improvements will include: construction of a 2story, 22,655 square feet structure that will house state-of-the-art computer labs, technology center, science lab, classrooms, multipurpose resource and activity center, athletic center, and a cafeteria. In addition to providing alternative education to

T O

Clara B. Ford and Vista Meadows Academies

Clarkston Community Schools

Expected Completion Date

P P A

O R 6 months

Funding Request

Route (Infrastructure Only)

D VE $

9,350,500

$

1,800,000

$

500,000

$

850,000

N s

Dearborn Heights

Clarkston, MI

d e tt

Building Exterior Renovations

t i m

t s e

qu

e R

Exterior renovations are the key to maintaining a strong and healthy school building infrastructure. In Clarkston, our renovations will improve aging windows, exterior doors, brick and mortar, stucco, painting, caulking, and gutters. Once completed, this work will improve rodent/pest intrusions, standing water/ice and further damage to the infrastructure. Currently, educational dollars are being spent on maintaining our aging buildings and creating infrastructure to handle the growing air quality and technology needs. 6/15/2009

Clarkston Science, Math and Technology Academy (CSMTech) is a unique program housed within Clarkston High School. CSMTech delivers a rigorous curriculum preparing every student with 21st century skills in the area of math, science and technology literacy. Strong partnerships further enhance our student learning, which can be evidenced in Team RUSH and CSMTech. In the past 4 years, Team RUSH (CHS Robotics Team) partnered with public and private corporations, receiving over $100,000 in sponsorships. CSMTech is able to provide opportunities for K-12 students to gain real-world experience and applications through these partners which include a majority from Automation Alley. Team RUSH Robotics has competed in the World Championships for the past 13 years. In the past two years, Team RUSH has shared the excitement of math, science, robotics and technology and celebrated learning at over 100 community events. Expansion is needed to handle the growing Educational Technology -- Clarkston Science, demands and specific goal of encouraging young females and minorities to enter the field of engineering, math, science and technology. This expansion requires one com 4/9/2009 Math and Technology and Team RUSH

9/1/2009

b u S Clarkston Community Schools

Clarkston, MI

02262009

Submitted Requests - Not Approved

189 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarkston Community Schools

Clarkston, MI

Project Name

Project Description

Start Date

Site Improvements

Site improvements are essential to the overall safety and security of school buildings. Proposed projects will improve aging parking lots, walkways, and safety paths in the District. Safety paths will help our district to reduce transportation costs and improve quality of life for youngsters. With obesity on the rise, students and families need safe areas in which to walk, ride bikes and exercise. Lighting improvements are integral component to keeping our schools safe and secure. Proper lighting ensures the perimeter of the buildings can be seen and provides proper lighting to help in the use of security cameras. Access to and from our buildings are in need of repair. Entrances allow for better traffic control and emergency access for equipment and needed safety vehicles. Signage and electronic messaging will provide public awareness of activities within schools and can help in strengthening better partnerships with preschool and senior citizen residents. Landscaping is far more than aesthetic. Improved landscaping provides shading and safety from traffic along with reduced noise levels. 6/15/2009

Building Interior Renovations

Ensuring our buildings are safe and secure is always a priority. Additionally, handling the growing needs of our disabled population is an area of concern. School buildings need additional funds to ensure that all ADA accessibility issues are addressed and work is maintained to allow everyone full access to programs and services. Proposed projects will repair and renovate 11 instructional buildings and 2 support structures. Work such as replacing carpeting and tile will take place at these sites. Improvements in classroom casework, doors, plumbing fixtures, partitions, bleachers, improved entry ways, ADA accessibility, and a lift in the pool will enhance student behavior and environment. 6/15/2010

T O

Clarkston Community Schools

Clarkston, MI

Expected Completion Date

N s

t s e

P P A

O R

True integration of technology into the classroom requires a robust and reliable infrastructure to support it. In order to insure that our students receive the maximum benefit from the use of technology they must be able to access it as expected, when expected. The Clarkston Community School district strives to provide the best infrastructure at the lowest possible cost to the community. Server and desktop virtualization technology shows great promise in enabling school districts to increase system reliablility while at the same time reducing acquisition costs and operating expenses. In addition, virtualization allows the district to operate it's computer resources in a more environmentally friendly manner. Virtualized servers and desktops consume far less energy than traditional servers and desktop computers. The district would encorporate this "greening" of our technology into science and social studies curriculums. This project would allow the district to update and virtualize its network servers and operating system. It would allow us to establish thin-client desktop computing technology that will extend the useful life-cycle of our end-user com

Funding Request

Route (Infrastructure Only)

D VE

9/1/2009

$

3,000,000

9/1/2010

$

2,000,000

$

589,450

u q e

Clarkston Community Schools

R d

Clarkston, MI

i m

b u S 02262009

e t tt

Virtualization & Access Technology Upgrade

Submitted Requests - Not Approved

190 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarkston Community Schools

Clarkston Community Schools

Clarkston, MI

Project Name

Project Description

Start Date

Community Based Instruction

Clarkston Community Schools has been involved in vocational education for secondary students in accordance with federal mandates and state mandates up to age 26. In order to provide community awareness for students with autism and cognitive impairments, we would need to expand the opportunity to develop microenterprise businesses. With the current emphasis on environmental effects, one type of business would be to provide the community with services such as recycling plastic products such as bottles as well as shredding paper. Another micro-enterprise would be collaboration with medical facilities in the area with the goal of assembly and packaging of medical instruments. Micro-enterprises would also include collaboration with local businesses for packaging, i.e., packaging sugar, creamers for coffee companies, or packaging baby products for hospitals for new mothers. Transportation means for delivering services would be needed. In addition, Clarkston Community Schools’ special education post-high program seeks to provide a location for vocational training of students with autism and cognitive impairments in areas such

Health & Safety Projects

Safety projects are of utmost importance when dealing with schools and the children we serve. Aging school buildings often struggle with hazardous materials and poor ventilation. In Clarkston, our projects include ventilation for art and science classrooms, removal of environmental hazards such as chemicals and asbestos and improved playground equipment. Upgrading our security systems, keying systems and scan cards are also being addressed. Buildings that have these upgrades are able to better secure their sites and modify heating and cooling systems to coincide with building usage. 6/15/2010

O R

P P A

Funding Request

670,000

9/1/2011

$

975,000

Clarkston Community Schools has been working diligently on efficiency and recycling efforts to both educate our students and to have a lasting impression on our environment. Working in harmony with the U.S. Environmental Protection Agency (EPA), our schools have earned recognition for superior energy efficiency and environmental protection. To continue this work and make more projects available to targeted populations, the district is proposing improvement of energy efficiency to all 13 buildings in the district. Electrical projects include changing obsolete t-12 lamps to t-8 lighting, installing motion sensors that can also include daylight harvesting, lighting programmer controls for various buildings, and LED lighting. Mechanical projects include boiler replacement, energy recovery units, pumps and motors, variable speed drives, uni-vents and energy management controls. These enhancements can further reduce our operating costs while helping to protect and maintain our natural resources. 6/15/2010

9/1/2010

$

2,500,000

Efficient school buildings help to put more money into classroom instruction and academic support for every learner. Aging roofs on school buildings is a major concern throughout the State of Michigan. When building repairs are ignored, air quality becomes an issue, the efficiencies of the building can drain operating expenses and other more costly problems can surface. In Clarkston, our proposed project will repair and replace the roofs on all structures that are 20+ years. The modernization of ten building roofs will improve life expectancy to 2035. The repair will eliminate leaks, mold, and rust from existing roofing structures. It will also decrease the amount of maintenance time and money that is currently expended due to aging roofs. Modern installation will also improve energy within the buildings. Heating and cooling efficiencies are key to keeping educational dollars flowing directly into the classroom and not on maintenance and building repairs. Lastly, jobs will be generated through this project, as district projects are bid out and open to the public. 6/15/2009

9/1/2009

$

1,000,000

N s

Route (Infrastructure Only)

D VE $

T O

Clarkston, MI

Expected Completion Date

t s e

u q e

Clarkston Community Schools

Clarkston, MI

e t t

Energy Efficiency Upgrades

t i m

b u S Clarkston Community Schools

Clarkston, MI

02262009

R d

Roof Replacement

Submitted Requests - Not Approved

191 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarkston Community Schools

Clarkston, MI

Project Name

Project Description

Start Date

Online Experiences

The state of Michigan requires that all students have an online educational experience as a requirement of graduation. The Clarkston Community School District is striving to meet this requirement in several ways. One strategy is to encourage our teachers to develop and deliver at least a portion of their curriculum online. To this end we have acquired the Moodle Learning Management System. While there is no specific cost to the district for the software itself, a successful implementation of online curriculum requires that teachers are thoroughly trained in the use of the application as well as in online educational practices. In addition, to ensure the highest quality of online content, teachers must be compensated for time spent developing and managing their online courses. This project would provide funds for professional development in the creation, use and management of online curriculum and materials It would also provide initial funding for the development of specific online courses.

Enhanced Alternative High School Program

Clarkston Renaissance Alternative High School (RHS) is a separate, non-traditional program within a K-12 public school district established to provide personalized education for students who are at risk of not graduating with their class and/or have individual needs not being met in a traditional setting. Renaissance services 170, 9th through 12th grade general and special education students (17%). One hundred percent of the students are at risk of dropping out or not graduating on time. Eightytwo percent are behind in credits when they enroll at RHS, sixty percent are males and thirty-two percent receive subsidized lunches. Currently, remediation and acceleration are provided in math, science, social studies and language arts through on-line programs, extended time courses, cross curricular collaboration and independent work with teachers. Technology allows RHS to deliver curriculum at speeds and times that are most beneficial to the learner. PLATO curriculum and Fast For Word intervention are currently used. The current program’s effectiveness could be greatly enhanced with the following. First money would be used to purchase hardw

$

145,000

Clarkston Community Schools has been and continues to support state and federal mandates in regard to Extended school year (ESY) for students as indicated on their Individual Educational Program (IEP). Extended school year services must be considered for every student with a disability and must be provided if determined by the IEP team to ensure a free and appropriate public education (FAPE). ESY services refer not only to special education but also to related services that may be needed to support the student’s ability to sustain an attained level in academic and/or social areas. A student with a goal area of concern may be determined to need ESY services due to a serious potential for regression of skills beyond a reasonable period of recoupment, the nature or severity of the disability or critical stages or areas of learning. Supporting students through best practice interventions, especially in the area of Autism and emotional impairments, allow students to continue working on goals with minimal regression at the start of the new school year. In order to structure each student’s summer opportunities, team planning must begin during the months pr

$

200,000

t s e

Route (Infrastructure Only)

D VE 100,800

s

Clarkston, MI

PP

O R

Funding Request

$

A T

Clarkston Community Schools

Expected Completion Date

O N

u q e

R d

Clarkston Community Schools

Clarkston, MI

ub

i m

e t tt

Extended School Year Services

S 02262009

Submitted Requests - Not Approved

192 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarkston Community Schools

Clarkston, MI

Project Name

Project Description

Start Date

Early Childhood Intervention

As early intervention strategies and expectations are developed through state and federal mandates, Clarkston Community Schools has begun to develop programming that support early intervention strategies. Developing interventions and providing services in a minimum of 51% of the natural environment has moved students out of the classroom. Children 0-2 years old, who receive services as indicated on an Individual Education Program (IEP), are serviced through appropriate home visits by the early childhood special education teacher, occupational therapist, physical therapist, speech teacher and/or social worker. Meeting the mandate can be difficult as some families refuse home visits; therefore, impacting the district’s ability to meet state and federal mandates. In order to support children early and to provide opportunities for social interaction, the Clarkston Community Schools’ DOLLS early intervention program seeks to support needed services through field trips, which can also maintain the natural environment between each month. In addition, technology needs would assist with communication as staff travel between home visits and provid

Response to Intervention

Clarkston Community Schools

Clarkston Community Schools

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE $

228,500

Clarkston Community Schools is in the process of collecting information as well as preparing to implement Response to Intervention (RTI) as a district initiative to support struggling learners. Response to Intervention is a multi-tiered approach to help learners who have difficulty in comprehension and understanding of concepts when compared with their peers. Students' progress is closely monitored throughout each intervention to determine the need for further research-based instruction and/or intervention in general education. Supported through on-going monitoring and a collection of data, RTI delivers scientifically based interventions for students and indicates each student’s response to provided strategies. Information is collected which either supports a sustained intervention or a need for change. Educational best practice, with the goal of supporting individual student needs especially at the primary and middle years, indicates that in many cases struggling learners can prosper and grow when supported through interventions prior to being tested for special education eligibility. When academic skills fail to thrive despite well-designed interventions, this

$

370,000

During bond funded projects in 1998 and 2003, Clarkston Community Schools was able to equip all district schools with at least one computer lab. With the expanded use of technology in the curriculum in general, and the adoption of several key curricular applications, this has proven to be insufficient to adequately meet the needs of our students. This project will provide access to mobile, network connected notebook computer labs at every school in the district. Each of these labs will contain thirty-two notebook computers housed in two carts. Each cart will also contain a wireless network access point and a wireless printer.

$

396,800

In today's classrooms, as well as in the world in general, flexibility and mobility are key components in the effective use of technology. Wireless networking technology is a critial component in allowing for maximum flexibility when planning for the integration of technology in education. This project would provide building-wide wireless networking at all secondary schools in the district. This would enhance the ability of our staff and students to utilize notebook computers, wireless equipped handheld computers and other WI-Fi enabled technologies.

$

420,000

T O

Clarkston Community Schools

Expected Completion Date

N s

Clarkston, MI

Clarkston, MI

S

Clarkston, MI

02262009

it

Wireless Access Enhancement

u q e

R d

e t t

Mobile Technology Access

m b u

t s e

Submitted Requests - Not Approved

193 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarkston Community Schools

Clarkston, MI

Project Name

Project Description

Start Date

Teacher Incentive Fund

Teacher Specialists for at-risk learners in reading and mathematics will be hired to provide both remedial and accelerated lessons to at-risk learners at all three Title I elementary schools (North Sashabaw Elementary, Pine Knob Elementary and Andersonville Elementary). While all three Title I schools are meeting AYP standards, the at-risk populations still demonstrate below grade level performance in reading and math. The units of instruction and lessons will be designed by these at-risk teacher specialists and taught by the teacher specialists and other teachers that they train. These lessons will be provided during the regular school day and will also be offered after school and during extended summer school academic camps at these schools. As an incentive to keep the teachers working in this program, those teachers hired for these six positions will be provided enhanced professional development opportunities through professional conferences and tuition-based training. Costs for such development will be reimbursed to the teachers through the Teacher Incentive Fund dollars, and teacher reimbursements will be based on increased student achievement

International Baccalaureate Middle Years Program

Clarkston Community Schools is seeking the opportunity to provide the International Baccalaureate (IB) Middle Years Program (MYP) to students in grades 6-10. The IB MYP strives to intellectually and personally develop students' international awareness of an increasingly global and changing world. In addition, because the IB Middle Years Program is structured to incorporate all students into learning how to learn and evaluate critical information, the program is designed to reach out to all level learners. It is the belief of the district that it is during these early adolescent years that students have the greatest potential to develop their learning style, achieve success while maintaining rigor within their academics, undertand and empathize with peers who may not necessarily share similar view points as well as to begin to balance personal and school responsibilities. Learning through a positive attitude, challenging students through critical thinking, reflecting on conversations and lessons are opportunities students in grades 6-10 will develop as a school that will carry on not only through hig

Clarkston, MI

PP

O R

Funding Request

447,667

$

662,400

In 2008 the Clarkston Community School District began a pilot Fast ForWord program. Fast ForWord is a reading intervention for students who are reading below grade level. The district currently licenses this product at three of its 10 schools. Preliminary data are very encouraging and indicate that the program is achieving the desired effect. The district would like to make use of the program at all of its schools so that all district students have an equal opportunity to benefit from this application. This project would provide funding for Fast ForWord licensing for the remaining seven schools in the district.

$

671,000

21st Century communication tools are essential in today’s classroom. Computers and video sources connected to data projectors enable teachers to display clear expectations, communicate ideas clearly and dramatically, and augment discussions seamlessly with relevant information from the Internet or other data sources. Electronic whiteboards give teachers and students the ability to interact with the data and other information in a way that is more natural and engaging. This project will provide for the installation of the following equipment in each of the districts four hundred and forty-one classrooms: mounted data projector, electronic whiteboard, DVD/VCR player with TV tuner, and sound field (voice amplification) system. It would provide for all data and electrical cabling and connections and would include Crestrontype control units to make it easier for teachers and students to use the equipment. In addition it would provide for shared document cameras for each grade level or department in all buildings. Clay Pit bridge rehab

$ $

1,765,800 25,000

s

t s e

Route (Infrastructure Only)

D VE $

A T

Clarkston Community Schools

Expected Completion Date

O N

u q e

Clarkston Community Schools

Clarkston, MI

R d

e t tt

Educational Software Enhancement

i m

b u S Clarkston Community Schools Clay Township

Clarkston, MI Clay Township

02262009

Classroom Technology Enhancement

Submitted Requests - Not Approved

194 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Cliffs Natural Resources

Battle Creek, MI

Project Name

Project Description

Battle Creek Renewable Fuels Project: In Battle Creek, Renewafuel is in the process of developing its current R&D facility into a commercial grade operation. 6/1/2008

Renewafuel

Cliffs Natural Resources

Sawyer Intl. Airport

Renewafuel

Climax Township

Township

Township Hall

Township

43rd St.

Pulverize,gravel, and HMA paving road surface.

Climax Township

Township

TS Ave.

Pulverize,gravel, and HMA paving road surface.

Climax Township Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Clio Area Schools Cohoctah Township Cohoctah Township

Township City of Clio Same Same Same Same Same Same Same Same Same Cohoctah Township Cohoctah Township

T Ave Community Education Building Community Education Building Clio, Carter MS Clio, Carter MS Clio, Carter MS Community Education Building Community Education Building Clio, Carter MS Clio, Carter MS Clio, Carter MS Building Restoration Building Addition

Pulverize,gravel, and HMA paving road surface. Replacement of boilers (over 30 years old) Replacement of motors with variable drive motors. Replacement of motors with variable drive motors. Replacement of inefficient lighting in gymnasium Replacement of boilers (over 30 years old) Replacement of inefficient and leaking roofs Replacement of energy inefficient windows Replacement of energy inefficient windows Replacement of inefficient and leaking roofs Loading dock repair to facilitate access and improve safety Old Barn Restoration on Township Property Firehall Addition 24x40

Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities

City of Coldwater

u q e

S

e t tt

5/15/2009

10/1/2009

$

5/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/30/2009 6/15/2009 6/1/2009 9/1/2009

10/1/2009 10/1/2009 8/15/2009 8/15/2009 6/30/2009 10/1/2009 8/30/2009 9/30/2009 9/30/2009 8/15/2009 9/30/2009

$ $ $ $ $ $ $ $ $ $ $ $ $

TS Ave from 39th 238,535 St. to 42nd St. T Ave from 36th St. 268,570 to 39th St. 125,000 5,000 15,000 25,000 125,000 300,000 500,000 750,000 1,250,000 50,000 15,000 67,500

$

Washington (Clay to Jefferson) and Sprague St (Chicago to 550,000 Waterworks)

Public water distribution system; 4" to 8" water main reconstruction. Washington and Sprague St. 6/9/2009

Public water distribution system; 4" to 10" water main reconstruction. Monroe St.

8/9/2009

Coldwater Board of Public Utilities

City of Coldwater

Monroe St Sanitary Sewer Main

Public sanitary sewer collection system; 10" sewer main replacement. Monroe St.

Coldwater Board of Public Utilities

City of Coldwater

E.Washington St Water Main

Public water distribution system; 4" to 8" water main reconstruction. E. Washington Jefferson to Elm 10/9/2009

02262009

Submitted Requests - Not Approved

18,500,000 n/a

$

i m

Monroe St Water Main

D VE $

10/1/2009

Public sanitary sewer collection system; 15" sewer main reconstruction. Washington & Washington & Sprague Sanitary Sewer Main Sprague St. 6/9/2009 Wastewater Treatment Ammonia Discharge Public wastewater treatment plant ammonia discharge reduction. Includes trash Reduction screen installation and aeration tank media. 6/9/2009

ub

City of Coldwater

City of Coldwater

t s e

3,500,000 n/a

43rd Street from P Avenue to Q 184,090 Avenue

P P A

N s

Washington & Sprague Water Main

O R

8/9/2009

12/1/2009

$

500,000

5/15/2009

T O

8/31/2009

Funding Request

Route (Infrastructure Only)

$

R d

City of Coldwater

9/30/2009

Marquette Renewable Fuels Project: Renewafuel produces high energy, low emitting biofuels from local feedstocks for use in industrial and institutional power plants as a replacement or supplement to out-of-state coal. Renewafuel is in the process of designing and permitting a 150,000 ton facility at K.I. Sawyer in Marquette County. 4/1/2009 Construction of new energy efficient building for utilization as Township Hall, emergency shelter, and community center 5/15/2009

Climax Township

Coldwater Board of Public Utilities

Start Date

Expected Completion Date

12/9/2009

12/9/2009

$

12/9/2009

$

Washington (Clay to Jefferson) and Sprague St (Chicago to 2,470,000 Waterworks) Wastewater 2,080,000 Treatment Plant

$

Monroe St ( Washington to 600,000 Grand)

7/10/2009

$

Monroe St ( Washington to 2,200,000 Grand)

10/10/2009

$

7/10/2009

E.Washington 247,500 (Jefferson to Elm)

195 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Coldwater Board of Public Utilities

City of Coldwater

E.Washington St Water Main

Public sanitary sewer collection system; sewer main replacement. E. Washington Jefferson to Elm

10/9/2009

10/10/2009

Coldwater Board of Public Utilities

City of Coldwater

E.Washington St Water Main

Public water distribution system; 12" water main reconstruction. E. Washington Elm to Dead End

10/9/2009

10/10/2009

Coldwater Board of Public Utilities

City of Coldwater

E.Washington St Water Main

Public sanitary sewer collection system; sewer main replacement. E. Washington Elm to Dead End

10/9/2009

10/10/2009

Coldwater Board of Public Utilities

City of Coldwater

N. Michigan Ave Water Main

Public water distribution system; 12" water main reconstruction. N. Michigan Chicago to Grahl

10/9/2009

Coldwater Board of Public Utilities

City of Coldwater

N. Michigan Ave Water Main

Public sanitary sewer collection system; sewer main replacement. N. Michigan Chicago to Grahl

10/9/2009

N. Michigan Ave Water Main

Public water distribution system; 4" to 8" water main reconstruction. Orleans Michigan/Deadend

Coldwater Board of Public Utilities

City of Coldwater

O N

City of Coldwater

N. Michigan Ave Water Main

Public sanitary sewer collection system; sewer main replacement. Orleans Michigan/Deadend

Coldwater Board of Public Utilities

City of Coldwater

S. Michigan Ave Water Main

Public water distribution system; 12" water main reconstruction. Saulk/Chicago

City of Coldwater

S. Michigan Ave Water Main

City of Coldwater

Bennett St Water Main

City of Coldwater

Bennett St Water Main

City of Coldwater

Grand St Water Main

City of Coldwater

Grand St Water Main

City of Coldwater

Pearl St Water Main

City of Coldwater

Pearl St Water Main

Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities

tt i m

b u S

d e t

s

t s e

$

E.Washington (Elm 470,000 to Dead End)

PP

10/10/2009

$

N. Michigan Ave ( 575,000 Chicago to Grahl)

10/10/2009

$

N. Michigan Ave ( 485,000 Chicago to Grahl)

10/9/2009

10/10/2009

$

N. Michigan (Orleans to 175,000 Michigan/Deadend)

10/9/2009

10/10/2009

$

10/9/2009

10/11/2009

$

S. Michigan Ave 350,000 (Saulk to Chicago)

10/11/2009

$

10/11/2009

$

10/11/2009

$

10/11/2009

$

10/11/2009

$

10/11/2009

$

10/11/2009

$

S. Michigan Ave 285,000 (Saulk to Chicago) Bennett St (Park to 150,000 Hooker) Bennett St (Park to 105,000 Hooker) Grand St (Clark to 1,200,000 Church) Grand St (Clark to 830,000 Church) Pearl St (Hudson to 730,000 Sprague) Pearl St (Hudson to 485,000 Sprague)

10/11/2009

$

Walnut St 470,000 (Riverside to Pearl)

10/11/2009

$

10/11/2009

$

10/11/2009

$

S.Michigan -

qu

Public water distribution system; 4" to 8" water main reconstruction. Walnut Riverside/Pearl

Walnut St Water Main

City of Coldwater

Walnut St Water Main

City of Coldwater

Taylor St Water Main

City of Coldwater

Taylor St Water Main

Public sanitary sewer collection system; sewer main replacement. Walnut Riverside/Pearl 10/9/2009 Public water distribution system; 4" to 8" water main reconstruction. Taylor - Grand to Clay 10/9/2009 Public sanitary sewer collection system; sewer main replacement. Taylor - Grand to Clay 10/9/2009

S. Jefferson Water Main

Public water distribution system; 4" to 8" water main reconstruction. S. Jefferson Garfield/Chicago

02262009

O R

N. Michigan (Orleans to 185,000 Michigan/Deadend)

City of Coldwater

City of Coldwater

D VE

E.Washington (Elm 423,000 to Dead End)

Public sanitary sewer collection system; sewer main replacement. S.Michigan Saulk/Chicago 10/9/2009 Public water distribution system; 12" water main reconstruction. Bennett St - Park to Hooker 10/9/2009 Public sanitary sewer collection system; sewer main replacement. Bennett St - Park to Hooker 10/9/2009 Public water distribution system; 12" water main reconstruction. Grand Clark/Church 10/9/2009 Public sanitary sewer collection system; sewer main replacement. Grand Clark/Church 10/9/2009 Public water distribution system; 4" to 12" water main reconstruction. Pearl Hudson/Sprague 10/9/2009 Public sanitary sewer collection system; sewer main replacement. Pearl Hudson/Sprague 10/9/2009

e R

Submitted Requests - Not Approved

E.Washington 275,000 (Jefferson to Elm)

$

$

A T

Coldwater Board of Public Utilities

Funding Request

Route (Infrastructure Only)

10/9/2009

10/9/2009

10/11/2009

$

Walnut St 365,000 (Riverside to Pearl) Taylor St (Grand to 510,000 Clay) Taylor St (Grand to 380,000 Clay) S. Jefferson (Garfield to 1,320,000 Chicago)

196 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Coldwater Board of Public Utilities

City of Coldwater

Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities Coldwater Board of Public Utilities

Project Name

Project Description

Start Date

Expected Completion Date

S. Jefferson Water Main

Public sanitary sewer collection system; sewer main replacement. S. Jefferson Garfield/Chicago

10/9/2009

10/11/2009

City of Coldwater

N. Jefferson St Water Main

Public water distribution system; 4" to 8" water main reconstruction. N. Jefferson Chicago/Pierce

10/9/2009

10/11/2009

City of Coldwater

N. Jefferson St Water Main

Public sanitary sewer collection system; sewer main replacement. N. Jefferson Chicago/Pierce

10/9/2009

10/11/2009

City of Coldwater

Wastewater I&I reduction study

Public wastewater collection system I&I study.

6/9/2009

City of Coldwater

Water Treatment Emergency Generation

6/9/2009

City of Coldwater

State St Sanitary Sewer Lift Station

Public water treatment plant emergency generation. Public sanitary sewer collection system; lift station and forced main reconstruction. State St and Fairfield Dr.

City of Coldwater

Sanitary Sewer Liner

City of Coldwater

Funding Request

S. Jefferson (Garfield to 930,000 Chicago)

$

D VE $

Route (Infrastructure Only)

N. Jefferson St 550,000 (Chicago to Pierce)

12/9/2009

$

10/9/2009

7/10/2009

$

Public sanitary sewer collection system; sewer relining in various critical locations.

8/9/2009

8/11/2009

$

Willowbrook Water Main Extension

Public water distribution system extension; Willowbrook / I69 / MI Ave.

8/9/2009

8/10/2009

$

N. Jefferson St 390,000 (Chicago to Pierce) Entire collection 700,000 system Water Treatment 220,000 Plant State St and 270,000 Fairfield Dr. Entire collection 1,000,000 system Willowbrook / I69 / 750,000 MI Ave.

City of Coldwater

Broadband System Expansion

10/9/2009

10/11/2009

$

5,000,000 Coldwater Lake

City of Coldwater

Garfield Substation Reconstruction

8/9/2009

12/10/2009

$

1,200,000 Garfield

City of Coldwater

Garfield Substation Transformers

8/9/2009

12/10/2009

$

4,000,000 Garfield

City of Coldwater

Bennett St Substation Reconstruction

8/9/2009

12/10/2009

$

1,000,000 Bennett St

City of Coldwater

Bennett St Substation Transformers

Public broad band system expansion to rural areas. Public electric utility; 66 MVA electrical substation protective equipment reconstruction; Garfield Substation. Public electric utility; 138 / 13.8 kV, 33 MVA transformer replacement; two each. Garfield Substation Public electric utility; 40 MVA electrical substation protective equipment reconstruction; Bennett St Substation Public electric utility; 13.8 kV / 8.32 kV, 20 MVA transformer replacement; two each. Bennett St. Substation

8/9/2009

12/10/2009

$

City of Coldwater

Electric System Load Study

Public electric utility system load study and improvements.

6/9/2009

6/11/2009

$

City of Coldwater

Electric System Efficiency Study

Public electric utility system efficiency study and improvements.

6/9/2009

6/11/2009

$

City of Coldwater

Smart Electric Grid

Public electric utility system AMR/AMI and smart electric grid conversion.

8/9/2009

8/11/2009

$

4,000,000 Bennett St Electric Distribution 1,000,000 Grid Electric Distribution 1,000,000 Grid Electric Distribution 500,000 Grid

City of Coldwater

Bulk Electric transmission Line Source to City Public electric utility, bulk electric transmission line, alternate source. Bulk Electric transmission Line Loop Feed to Distribution Substations Public electric utility, bulk electric transmission line radial to loop feed conversion.

10/9/2009

8/11/2009

$

10/9/2009

8/11/2009

$

5/1/2009

$

City of Coldwater

tt i m

d e t

T O

s t s

P P A

-N

e u

q e R

O R

Implementation of a full service supermarket to address the Fresh Food, Fruit and Produce imbalance within underserved communities within the City of Detroit. This state of the art full service market will compliment the recently developed Coleman Foundation Strip Mall located directly across the street at the intersection of Linwood and Clairmont. The full service Super Market will be configured in a manner consisten with addressing issues and concerns associated with the negative affects of malnutrition. learning diabilities, mental and pyschological issues within these under served communities. The Value Proposition for the Market will link the consumption o Fresh Foods, Fruit,Vegetables and Produce to studies that measure the impact of Diet on high mortality high negative impact diet related diseases in underserved communities. A world class supermarket located in said community has as it's objective reduction medical cost, facilitate the healthy rearing of children.World Class Coleman Foundation Full Service "Whole Life Food Shopping in a Food Vacuum. In addition it will serve as an instrument to study diet impact on a number of health issues indemic to the communities that it will serve. 10/1/2008 Food Market

7/10/2009

$

$

10,000,000 Quincy /US 12 Electric Distribution 3,000,000 Grid

b u S COLEMANFOUNDATI ON Detroit

02262009

Submitted Requests - Not Approved

5,000,000

197 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Colin Powell Academy Detroit

Colin Powell Academy

Colin Powell Academy Colin Powell Academy

Colin Powell Academy Colin Powell Academy

Colin Powell Academy Colin Powell Academy

Colin Powell Academy

Project Name

Project Description

Start Date

Expected Completion Date

Colin Powell Academy Detroit's School Community Education Center

Colin Powell Academy's School-Community Development Project will rehabilitate the 60-year-old, 148,532 square foot physical plant to ensure: a safe and healthy K-5 learning environment ; provide classroom and office facilities for adult education, employment and employability skills training programs; free family health and medical services clinics; and, indoor sports and fitness opportunities. The proposed project consists of the five following components detailed below:

Colin Powell Academy Detroit's School Community Education Center

(2) Resurface parking lot, create "green area" and children's and youth playground,: includes: excavation of current lot; removal of construction debris; ground leveling and resurfacing; landscaping and construction of special play, leisure and sports areas. 3/1/2009

(1)Remove/Replace 60-year-old slate and asphalt shingle roof/decking; repair and/or Colin Powell Academy Detroit's School replace underlying roof structures, reconstruct support structure, drainage system; Community Education Center replace roof 3/1/2009 Colin Powell Academy Middle School Harper (3) Remove and Install Boilers and Install Air Conditioning System for 103, 297 Woods Education Center Project square foot building. 2/1/2009

A T

PP

O R 7/1/2009

Funding Request

D VE $

100,000

7/1/2009

$

300,000

7/1/2009

$

375,000

Route (Infrastructure Only)

Colin Powell Academy Middle School Harper Woods Education Center Project Colin Powell Academy Middle School Harper Woods Education Center Project

(1) Upgrade and enhance the usability of 50,000 square feet of space in three vacant training and dormitory buildings on school property for professional development, conferences and events rental to generate jobs and sustainable income 4/1/2009 (2) Renovate Repair /Replace \flooring spectator areas, male and female locker rooms for Gym and Fitness Center 3/1/2009

1/1/2009

$

500,000

9/1/2009

$

500,000

Colin Powell Academy Detroit's School Community Education Center Colin Powell Academy Detroit's School Community Education Center

(3) Remove and Install Heating, Ventilation and Air Conditioning systems, including: removal of four boilers from sub-basement; and installation of new boiler and air conditioning systems. (4) Renovate Existing Gymnasium and Build New Indoor Sports and Family Fitness Center

6/1/2009

10/1/2009

$

500,000

8/1/2009

9/1/2009

$

750,000

$

300,000 Not Applicable

d e tt

t i m

Colin Powell Academy School-Community Development Project

e u

st

s

O N

Parking Lot Resurfacing and Outdoor Recreation Space for Colin Powell Academy's School-Community Development Project is a critical component in our overall Community-School Initiative. Essentially our Initiative aims to rehabilitate and reconstruct our 60-year-old physical plant and its grounds to ensure (1) a safe and healthy learning environment for K-5 students; (2) create classroom and office facilities for comprehansive adult and community education programs; (3) provide space use for public and private employment and employability skills training and job placement services and free family health and medical services clinics;and,(4) offer access to community and faith-based organizations for indoor sports practice and games.The Parking Lot and Exterior Recreation Space will consist of (1) design and blueprinting for parking lot and "green area" and children's and youth playground; (3) excavation of current parking lot; (2) removal of construction debris; (3) ground leveling and resurfacing; (4)landscaping and construction of special play, leisure and sports areas.

q e R

b u S 02262009

Submitted Requests - Not Approved

198 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Colin Powell Academy

Colin Powell Academy

Project Name

Project Description

Start Date

Expected Completion Date

Colin Powell Academy School-Community Development Project

Heating,Ventilation and Air Conditioning Replacement Project is a critical componet in Colin Powell Academy's School-Community Development Initiative is a critical component in the rehabilitating and reconstructing our 60-year-old,148,532 square foot physical plant. Our Initiative to ensure (1) a safe and healthy learning environment for K-5 students; (2) create classroom and office facilities for comprehansive adult and community education programs; (3) provide space use for public and private employment and employability skills training and job placement services and free family health and medical services clinics;and,(4) offer access to community and faith-based organizations for indoor sports practice and games.The HVAC Project consists of: (1) HVAC mechanical engineering design, drawings, permits and approvals (2) removal of two 60-year-old boilers and associated nonfunctioning equipment and structures in the sub-basement. This step will necessitate significant metal cutting, masonry and metal working.(3) installation, testing and permit approvals for boilers (4) design for airconditioning installation and ducting; (5) n

Colin Powell Academy Detroit's School Community Education Center

(5) Remodel and Reconstruct approximately 40,000 square feet of the currently unoccupied west wing of the structure for use as the Colin Powell Adult Training and Skills Development Center for employment and training-retraining services, health care and family social services. 6/1/2009

T O

P P A

O R

Funding Request

D VE $

9/1/2010

Route (Infrastructure Only)

500,000 Not Applicable

$

2,500,000

$

2,500,000 Not Applicable

N s

The Adult Training and Skills Development Center is a critical component of Colin Powell Academy's School-Community Development Project. Our Iniative aims to rehabilitate and reconstruct our 60-year-old, 148,532 square foot physical plant to ensure (1) a safe and healthy learning environment for K-5 students; (2) create classroom and office facilities for comprehansive adult and community education programs; (3) provide space use for public and private employment and employability skills training and job placement services and free family health and medical services clinics;and,(4) offer access to community and faith-based organizations for indoor sports practice and games.The Adult Training and Skills Development Center will remodel and reconstruct approximately 40,000 square feet of the currently unoccupied west wing of the structure for use as adult employment and training-retraining services, health care and family social services. The Project will consist of (1) Colin Powell Academy School-Community architectural and mechanical designs; (2) interior demolition/reconstruction; (3) Development Project finishing (carpentry, plastering, partitions, electrical, plumbing). Colin Powell Academy Middle School Harper The Colin Powell Harper Woods' Education Center Project consists of the three (3) Woods Education Center Project components detailed below:

t s e

u q e

Colin Powell Academy Colin Powell Academy

College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies

College for Creative Studies

Argonaut Project

m b u

Detroit

Argonaut Project

Detroit Detroit Detroit

Detroit

02262009

e t t

it

Detroit

R d

Cultural Center Campus Upgrades

S

Argonaut Project

Thermal Comfort: If a survey is conducted and 20% of occupants are not comfortable, a plan will need to be developed and implemented. This may take engineer time. However if system is working correctly we should achieve this point without cost. NA Alternative Transportation: Low Emission Vehicles would need to be purchased and given priority parking. NA New Information Technology Infrastructure: integrated with system at Argonaut, including Voice 0ver IP for data, telephony and security. NA

Argonaut Project

Commissioning Building System NA On site renewable energy: In coordination with Next Energy on site Bio-fuel generation plant can be installed and a future location has been identified. NA

Cultural Center Campus Upgrades

Relocate and expand Crafts department into Kresge Ford; create a Student Center with enhanced cafeteria, 24 hour computer lab and studio, bookstore and student group offices/meeting area; also, includes system to recapture heat from gas furnace for heat recovery. NA

Submitted Requests - Not Approved

NA

$

25,000

NA

$

540,000

NA

$

750,000

NA

$

800,000

NA

$

1,000,000

NA

$

1,000,000

199 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies

Project Name

Project Description

Start Date

Expected Completion Date

Detroit

Cultural Center Campus Upgrades

Detroit

Argonaut Project

Upgrade and rehabilitate Kresge Ford Building: new HVAC system, including completion of DDC control implementation for energy cost control; LED lighting systems; replacement of existing roof with one incorporating solar panels and/or green roof; building envelope (curtain wall) reclad with energy efficient double clad facade as well as structural work to restore building. NA Alternative Transportation: Bike Storage is possible, quantity and location needs to be confirmed. NA

Detroit

Argonaut Project

Conference Center

6/1/2009

Detroit

Argonaut Project

NA

Detroit

Argonaut Project

Detroit

Argonaut Project

Detroit

Argonaut Project

Green Globe Rating Heat Island Effect: Install vegetated roof to reduce heat absorption at the South Entry Canopy and Light Well Roof on 9th Floor. Green Power: A 2 year contract could be purchased from DTE for Green Power at 2 cents a KWH. Alternative Transportation: Changing Facility is possible by adding new shower room or arranging membership at New Center Fitness.

Detroit

Argonaut Project

Detroit

D VE $

8,000,000

$

6,000

$

4,562,074

PP

NA

$

100,000

NA

$

132,000

NA

NA

$

225,000

NA

NA

$

250,000

NA

$

350,000

Argonaut Project

Conference Center - Completion of Perimeter Breakout Rooms NA Controllability of HVAC systems is possible but additional Thermostats and Box would be necessary to meet NA

NA

$

500,000

Detroit

Argonaut Project

Argonaut Building Basement Parking

NA

NA

$

570,000

Detroit

Argonaut Project

LEED EB silver level ratings

NA

NA

$

600,000

Detroit

Argonaut Project

Surface Parking

5/1/2009

9/1/2009

$

648,106

Detroit

Argonaut Project

College for Creative Studies - Additional Graduate Studies & Design Research Center

$

971,000

Detroit

Argonaut Project

Road, Infrastructure, Streetscape, Parks & Landscaping

Detroit

Argonaut Project

Detroit

Argonaut Project

Detroit

Argonaut Project

Detroit

Argonaut Project

NA

A T

st

e u

eq

s

O N

R d

College for Creative Studies - Public Art Gallery

e t t

NA

Funding Request

NA

O R 9/1/2009

5/1/2009

9/1/2009

$

1,197,643

5/1/2009

9/1/2009

$

1,260,447

$

1,370,172

College For Creative Studies - Student Housing - 6th Floor Middle/High Charter School Gymnasium

5/1/2009

9/1/2009

$

3,086,449

Third Party Lease Space - Tenant Specific Build-out

NA

NA

$

4,592,350

Middle/High Charter School 5/1/2009 Regionally Manufactured Materials: We may have achieved this point but may have an opportunity to achieve this point with minimal costs NA

9/1/2009

$

31,038,721

9/1/2009 9/1/2009

$

200,000

Argonaut Project

Storage of Recyclables 5/31/2008 Measurement and Verification: We have enhanced electronic meters on electrical, gas and water services 5/31/2008 Enhanced Refrigeration Management: We are using refrigerant free of CFC’s and HCFC’s and compliant with LEED Guideline 5/31/2008

9/1/2009

$

250,000

Detroit

Argonaut Project

Controllability of lighting systems all rooms are on motion sensors and or timers

5/31/2008

9/1/2009

$

300,000

Detroit

Argonaut Project

Heat Island Effect Roof: We are replacing roof with PVC (SR SRI 79 or greater

5/31/2008

9/1/2009

$

900,000

it

m b u

Detroit

Argonaut Project

Detroit Detroit Detroit Detroit

02262009

Argonaut Project

S

Argonaut Project

Argonaut Project

Submitted Requests - Not Approved

Route (Infrastructure Only)

NA

200 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies

College for Creative Studies College for Creative Studies Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Columbia Township Commerce Township Commerce Township Commerce Township Commerce Township

Location City or Township

Project Name

Project Description Start Date Brownfield Redevelopment: Major cleanup in compliance with ASTM 1903-97 Phase 2 has occurred. 5/1/2009 Building Reuse: We have reused all structural components or the building. Doing so has cost a premium to renovate this historical building NA

Detroit

Argonaut Project

Detroit

Argonaut Project

Detroit

Argonaut Project

Detroit

Argonaut Project

Sustainable Project Scope 5/31/2008 Technology Infrastructure, Services & Support - Rapid Prototyping, 3D Visualization, Imaging Center & Voice/Data Technology 5/31/2008

Detroit

Argonaut Project

Parking Deck

10/1/2008

Detroit

Argonaut Project

Third Party Lease Space - White Box Condition

5/31/2008

Detroit

Argonaut Project

College For Creative Studies - Student Housing

5/31/2008

Detroit

Argonaut Project

College for Creative Studies - Under Graduate & Graduate Studies

Community Arts Partnerships (CAP)

To expand community-based art education programs to serve 8,000 predominately low-income minority youth in the inner-cities of Detroit and Highland Park through free neighborhood programs. 2009

Detroit

Continuing Education

To expand the College’s Continuing Education Department to offer re-training and professional development in creative fields, art and design certification courses and education camps for children and adults to serve 3,000 people annually.

Detroit Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp Columbia Twp

Argonaut Project Township Vehicles Miller Elementary Sewer Sewage Lift Station Dry Hydrants Fire Station #2 Fire Station #1 Non-motorized Trails Retrofit Township Park Road Signs Disaster Centers Township Park Non-motorized Trails Retrofit Fire Engine

Detroit

Commerce Township, Oakland County Commerce Township, Oakland County Commerce Township, Oakland County Commerce Township, Oakland County

02262009

S

ub

Sleeth Road H2S Project Effluent Force Main

Newton Rd FM

Funding Request

9/1/2009

$

1,300,000

NA

$

3,000,000

$

5,950,000

$

7,457,826

$

9,627,111

9/1/2009

$

12,799,425

9/1/2009

$

25,101,343

9/1/2009

$

59,985,040

2010

$

600,000

2009

2010

$

1,510,000

Additional Sustainable Project Scope Purchase 2 alternative fuel vehicles for twp business Extend Sanitary Sewer System Install Odor/Corrosion Preventation Equipment Install 30 Dry Hydrants Construct 960 Sq Ft Addition Construct 20x60 Addition Construct 2.5 miles of new trails Expand Twp Park, Hyde Road Purchase 100 Road Signs Purchase Relief Supplies Construct Water Park Upgrade 7 miles to current standards Purchase Ladder Truck

NA 7/1/2009 6/1/2009 4/1/2009 5/1/2009 7/1/2009 4/1/2009 6/1/2009 4/1/2009 3/1/2009 3/1/2009 5/1/2009 5/1/2009 3/12009

NA 8/1/2009 9/1/2009 10/1/2009 8/1/2009 9/1/2009 8/1/2009 10/1/2009 6/1/2009 6/1/2009 4/15/2009 6/15/2009 7/1/2009 6/1/2010

$ $ $ $ $ $ $ $ $ $ $ $ $ $

5,253,000 60,000 400,000 450,000 75,000 150,000 250,000 1,200,000 20,000 30,000 50,000 80,000 150,000 800,000

To construct a 1.5 Million Gallon water storage tower. Near Huron Valley Hospital. 200 feet of sanitary sewer to remove H2S emissions from the force main. Located near Huron Valley Hospital.

6/9/2009

6/10/2009

$

2,200,000

5/9/2009

11/9/2009

$

90,000

Effluent force main for WWTP. Near WWTP off of Welch Road. 4/9/2009 Sanitary Sewer Force Main. From Commerce Road to Newton Road, south to Oakley Park Road. 4/9/2009

10/9/2009

$

500,000

9/9/2009

$

2,000,000

s

t s e

A T

O N

u q e

R d

e t tt

i m

Water Tower

Expected Completion Date

Submitted Requests - Not Approved

12/31/2009 9/1/2009

PP

O R

5/31/2008

9/1/2009

Route (Infrastructure Only)

D VE

201 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

Community Health and Social Services (CHASS) Center Community Health Center Development 39912

T O

Detroit

P P A

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing

Jolly Rd Lighting Renovations

Enhancing the lighting and electrical systems.

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing

520 Cherry St. HVAC / Lighting/ Windows Renovations

Replace and enhance Lighting/HVAC/ and windows to increase energy efficiency.

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing

606 Shiawassee. HVAC/ Lighting/ Windows/ Renovation

Willoughby Rd Construction

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Holt/Delhi Twp

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties Comstock Township Comstock Township Comstock Township

Lansing/Delta Twp Comstock Township Comstock Township Comstock Township

Comstock Township Comstock Township Comstock Township Comstock Township Comstock Township Comstock Township

Comstock Township Comstock Township Comstock Township Comstock Township Comstock Township Comstock Township

02262009

D VE $

CHASS is developing a new 48,000 square foot facility on the land adjacent to its existing building to replace its Southwest Center. The building is intended to serve not only as a primary care facility but as a community center for health 17,700,000 and wellness. C

10/9/2009

2/10/2009

$

80,000

10/9/2009

2/10/2009

$

350,000

Replace and enhance Lighting/HVAC/ and windows to increase energy efficiency.

10/9/2009

2/10/2009

$

350,000

New construction: Specialized Residential Home for Adults with Developmental Disabilities

4/9/2009

10/9/2009

$

730,000

Storage Building to house Maintenance Supplies for servicing 50 plus properties owned by Community Mental Health Authority - supplies now stored at scattered sites throughout the tri-county region. Will greatly reduce transportation required to retrieve supplies - and thus unnecessary use of gasoline. 1/9/2009

4/9/2009

$

250,000

Appletree Home Renovations Chubb Ave. Sanitary Sewer Ext 28th St. Sanitary Sewer Ext. Miller Ave. & River St. Sanitary Sewer

To bring a Respite Home, for children with emotional disturbance, into ADA compliance, thus avoiding unnecessary use of inpatient care. Construction of sanitary sewer in Chubb Ave Construction of sanitary sewer in 28th Street Construction sanitary sewer in Miller Ave & River St

3/9/2009 6/15/2009 6/15/2009 6/15/2009

5/9/2009 11/15/2009 11/15/2009 11/15/2009

$ $ $ $

30,000 62,803 402,377 428,766

Gaywood Woodfield Sanitary Sewer Ext. M-96 Water Main & Sanitary Sewer Worden & JK Ave. Sanitary Sewer Ext. Merry Brook Sanitary Sewer Ext. Comstock Ave. Area Sanitary Sewer Shields Area Water Main Ext.

Construction of sanitary sewer in Gaywood - Woodfield. Construction of water main & sanitary sewer in M-96 west of Galesburg Construction of sanitary sewer in Worden & JK Ave Construction of sanitary sewer in Merry Brook Construction of sanitary sewer in the Comstock Ave Area Construction of water main in the Shields Area

5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009

$ $ $ $ $ $

125,705 194,775 457,817 1,111,992 1,340,607 1,816,350

itt

d e t

Maintenance Storage Building

u S

-N

6/10/2009

Funding Request

bm

s t s

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

202 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Concord Academy Petoskey Petoskey, MI

Connected Vehicle Proving Center

Consortium for Community Development

Consortium for Community Development Constantine Public Schools Constantine Public Schools Constantine Public Schools Constantine Public Schools Constantine Public Schools Constantine Public Schools Convenant Hospital Cooper Charter Township

Dearborn, MI & Brooklyn MI

Benton Harbor

Project Name Music Wing

Project Description Start Date Approximately 6,500 square foot building additiona, including Band room, Orff Room, and two classrooms 4/1/2009

Connected Vehicle Proving Center

Wireless communication is enabling vehicles to communicate with other vehicles and with road side equipment enabling significant improvements in safety, mobility, vehicle performance, and personal convenience. This project will build a complete laboratory and test environment for the Connected Vehicle Proving Center (CVPC) that was originally established in 2007 with a grant from Michigan Economic Development Corporation (MEDC) to create an integrated environment for testing and evaluating connected vehicle products throughout their lifecycle—from early conception to their final testing. This will include: (1) a rich set of live physical test sites including open roads supported by Michigan Department of Transportation an closed testing environment at Michigan International Speedway; (2) an operations center with stateof-the-art application software development environment and test configuration and results diagnosis tools; and (3) software simulation models of tests sites that support early, pre-product, use case definition and virtual testing. By offering a cost-shared environment that provides global vehicle manufacturers, parts suppliers, transportation8/5/2009

Harbortown Walk-able Certified Day Care Centers

Nationally certified license daycare is unavailable in the City f Benton Harbor. Consequently, many of the children of Benton Harbo are academicall, emotionally and behviorally unprepared to enter into the K-12 system. The impact of this disparity can be seen in the catagorically low MEAP scores (longitudinal studies bear this out) and extreme drop-out rate by 9th grade and dismal graduation rates. This program will wil help low-income (poverty line) families better prepare their children for success in K12 whichis the gateway to a higher life trajectory. Local residents will be trained to build and support the ongoing operation of these daycare centers. This project is owned and operated by a 501(c)3 Michigan Non-profit organization. 6/1/2009

T O

N s

t s e

u q e

Partial Roof Replacement

Constantine

Demolition of Canaris Building

The Canaris Building is a 100 year-old building that is no longer used by the District. The money would be used to raze the building and create parking space and/or a space for an alternative education building. 6/1/2009

Constantine

Update Server System

Saginaw Cooper Township

R d

Mercy Center for Community Revitalization

Constantine

Asbestos Removal

Constantine

Octagon Renovation

Constantine

Pipe Replacement

i m

b u S

Constantine

02262009

e t tt

6/1/2009

City of Saginaw Parking Ramp

Replace current server system with 3 Virtual Servers Purchase foreclosed, vacant properties and rehabilitate existing properties surrounding the main campus for expansion of existing programs.

Brackett Ave. Area Sanitary Sewer

Construction of sanitary sewer in Brackett Avenue Area.

8/15/2009

Submitted Requests - Not Approved

8/31/2009

O R

P P A

Primary health care site for 10,000 people in the Benton Harbor area who live at or below the poverty line. Rehabilitation of this building will assure the retention of 150 skilled jobs in Benton Harbor and put "walk-able" medical care in reach of the people who need it most. Rehabilitation of the physical plant will be used as job skills training employment targeting hardest serve populations. This building project is held/owned by a 501(c)3 Michigan non-profit organization 7/1/2009 Removal of asbestos from 100 year-old Canaris Building so that building is asbestos free and ready for demolition 6/1/2009 The Octagon is a separate building used by Riverside Elementary for Music and Art. It is in need of repairs - heating/cooling and interior work 6/1/2009 Replacing 50 year-old pipes that are constantly breaking and leaking. This will lead to a reduction in our water usage/bills for the District 6/1/2009 This is the final section of roofing within the District that needs to be replaced - 25 years-old 6/1/2009

Benton Harbor

Expected Completion Date

Funding Request $

500,000

D VE

12/31/2010

$

1,519,000

6/1/2011

$

2,500,000

12/1/2010

$

8,200,000

6/30/2009

$

20,000

8/15/2009

$

50,000

8/15/2009

$

150,000

6/30/2009

$

30,000

7/1/2009

$

100,000

8/30/2009

$

110,000

$

1,000,000

$

11,160,000

4/1/2009 11/15/2010

Route (Infrastructure Only)

203 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Corrosion Control Solutions, Inc.

Grand Rapids

Countryside Academy Benton Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Project Name

Countryside Academy Benton Township

02262009

Start Date

Corrosion Control Solutions, Inc. is requesting $500,000 in funding to assist in the development, manufacturing and sale of its innovative Wind Turbine Anchor Bolt Cover. With a current installed capacity of 21,017 MW of wind power in the United States today, this represents an estimated 3,236,618 anchor bolts for wind turbines. A majority of these anchor bolts are currently uncovered and have no protection from corrosion. As these anchor bolts corrode, the wind turbines become less stable, which could create future catastrophic problems. Currently, there are no anchor bolt covers that can provide the necessary protection as well as a facilitated removal method that the Corrosion Control Anchor Bolt Cover can provide. Corrosion Control Inc. is looking for funding to engage key staff, begin manufacturing, and implement a marketing/sales strategy. We believe that Corrosion Control Inc. can bring new jobs to Michigan and become a major part of the wind energy manufacturing supply chain. Corrosion Control Solutions, Inc. Anchor Bolt With a guaranteed 1,100 MW of wind to be developed in Michigan over the next Cover several years, it is estimated that this will create a market of a minimum of 86,350 anc March, 2009

A T

PP

O R

Funding Request

August, 2009

$

500,000

Upgrades for Jr/Senior High

6/1/2009

8/30/2009

$

570,000

Hydroponic Plant Science Laboratory

Renovate the existing greenhouse structure and agricultural science facility to better accommodate instruction in hydroponics. Replace existing natural gas heating system with more efficient and environmentally friendly geothermal and natural gas heating and cooling systems. Upgrade work surfaces for more efficient student hands-on learning. Install high-efficiency lighting systems. Renovation of climate control equipment. Allow for year round activity focusing on plant propogation (reduction of carbon footprint). 6/1/2009

11/1/2009

$

385,000

Color Laser Printers

Replacing out-dated laser jet printers with newer energy-efficient printers that have more memory, and take less power to operate at a more efficient capacity. These units require less amounts of toner per page. Four units are required to complete this project. 3/1/2009

6/30/2009

$

12,000

CCTV cameras are highly useful as the school administration can use these to monitor the movements of students and detect illegal activities like vandalism, drug use, fights, trespassing, and thefts. Video surveillance ensures that rules and regulations are followed and discipline is maintained in the school. CCTV security cameras help police to monitor schools remotely with CCTV digital technology.CCTV cameras in school can provide a sense of security to the students as well staff. 16 units will be required to complete this project. 3/1/2009

5/1/2009

$

16,000

PC Monitors

Replace existing CRT style pc monitors in the classrooms and offices. Flat panel monitors are energy efficient. Flat panel pc monitors have less glare and flicker, minimal radiation output and consume less power than CRT pc monitors. 120 units wi be required to complete this project. 3/1/2009

6/30/2009

$

22,000

Meadowbrook CCTV

CCTV cameras are highly useful as the school administration can use these to monitor the movements of students and detect illegal activities like vandalism, drug use, fights, trespassing, and thefts. Video surveillance ensures that rules and regulations are followed and discipline is maintained in the school. CCTV security cameras help police to monitor schools remotely with CCTV digital technology.CCTV cameras in school can provide a sense of security to the students as well staff. 32 units will be required to complete this project. 3/1/2009

5/1/2009

$

32,000

d e tt

t i m

Millburg CCTV

e u

st

q e R

s

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

Replace out-dated classroom heating systems with energy efficient geothermal energy source. Convert natural gas units in common areas to geothermal units. Replace main entrance/exit double doors. Install, for health reasons, water filtration system to bring the school within compliance of federal arsenic standards.

b u S

Countryside Academy Benton Township

Project Description

Expected Completion Date

204 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Countryside Academy Benton Township

Project Name

02262009

Start Date

Black and White Laser Printers

Replacing out-dated laser jet printers with energy efficient printers that have more memory. Take less power to operate at a more efficient capacity. Requiring less amounts of toner per page. Fifteen units are required to complete this project.

Interactive Whiteboards

Interactive whiteboards are used in many schools as replacements for traditional whiteboards or flipcharts or video/media systems such as a DVD player and TV combination. Users can also connect to a school network. Interactive whiteboards can also interact with online shared annotation and drawing environments in the form of interactive vector based graphical websites. The interactive whiteboard will allow the teacher to keep notes and annotations as an electronic file for later distribution either on paper or through a number of electronic formats. Interactive whiteboards allow teachers to record their instruction as digital video files and post the material for review by students at a later time. This can be a very effective instructional strategy for students who benefit from repetition, who need to see the material presented again, for students who are absent from school, for struggling learners, and for review for examinations. 3/1/2009

35,000

6/30/2009

$

65,000

PC

Replace out-dated pc's in the Labs and offices with newer pc's which consume less power, are more powerful and have more memory. Making them more efficient to utilize time and internet bandwidth.120 units will be required to complete this project. 3/1/2009

6/30/2009

$

80,000

Upper El Renovation

The Upper Elementary building consists of several modular buildings linked together. These units are 15 years old. In an effort to improve the building's ability to contain heat in the winter and conserve energy year round the windows, doors, hallway and bathroom floors, ramps and railings need renovation. In addition, the existing heating sources are out-dated and need replacing to more energy-efficient equipment. The building entrance and exits need to be outfitted with double doors to provide an energy efficient air lock. 3/1/2009

8/30/2009

$

165,000

Millburg Renovation

The Millburg Early Learning Center consists of a circa1928 historical building coupled with a 1964 addition. Part of the building has a flat roof which needs replacement for efficiency and functionality. The structure requires additional ceiling and wall insulation and window and door upgrades for energy efficiency and comfort. 3/1/2009

8/30/2009

$

310,000

Replace existing CRT style televisions in the classrooms currently used for in-school announcements/presentations. Special events such as the presidential inauguration with a more environmentally friendly flat panel TV's. Flat panel TV's have less glare and flicker, minimal radiation output and consume less power than CRT televisions. 50 units will be required to complete this project. 3/1/2009

6/30/2009

$

50,000

Virtually all projectors make it possible to attach a video camera and display what the camera is seeing on the big screen. In a high school history class, we can project a source document or an artifact of local importance. In a second-grade mathematics or science class, we could show a ruler as we explain the importance of starting a measurement at zero, or how to make measurements to the half-inch or millimeter. In a middle school science classroom, we could display an image of a Bunsen burner as you demonstrate the proper way of lighting it. In a writing class at any grade level, group editing requires a shared visual environment, and aiming the camera at a piece of student work would allow us to be confident that everyone is literally on the same page. 3/1/2009

6/30/2009

$

75,000

T O

3/1/2009

i m

Digital Projectors

t s e

u q e

R d

e t tt

Submitted Requests - Not Approved

O R

P P A

N s

Classroom Monitors

6/30/2009

Funding Request

$

b u S Countryside Academy Benton Township

Project Description

Expected Completion Date

D VE

Route (Infrastructure Only)

205 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

CraftWORKS! Foundation

Plainwell

Project Name

Project Description

Start Date

Plainwell LEED Construction for Historic Downtown Building

This construction project is for energy efficient green building renovations at the 119 N. Main St., Plainwell, Michigan. The Craftworks Foundation is set to rent the historic building for ten years once it becomes LEED project certified. As well as creating a green energy efficient structure, the building would serve as a LEED model for other rural downtowns and our community. 119 N. Main St. is located near the main downtown intersection and therefore should be one of the business district’s anchors but unfortunately has been vacant for three years. The local foundation will establish craft artist small business incubator at this location once the renovations are complete. A low-income housing apartment is on the upper floor and could be used as a live work space. Plainwell is located along the Kalamazoo River, and is a rural community that has suffered from the loss of our industrial base when the over 100year-old Plainwell Paper Mill shut down in November of 2000. At one point the company comprised 18% of the City’s taxable value and employed over 400 people. The 36-acre property continues to sit idle.The community desires to attract new entrep5/1/2009

Plainwell

Plainwell Historic Preservation and Adaptive reuse for Historic Downtown Building

PP

O R

Funding Request

$

396,000

This construction project is for historic preservation adaptive reuse renovations at the 119 N. Main St., Plainwell, Michigan downtown historic building to become ready for a ten year Foundation occupancy and use. 119 N. Main St. is located near the main downtown intersection and therefore should be one of the business district’s anchors but unfortunately it has been vacant for three years. We have a commitment from a local foundation to establish a craft small business inncubator once the renovations are complete. A low-income housing apartment is on the upper floor and could be used as a craft artist live-work space. Located along the Kalamazoo River, Plainwell, Michigan is a rural community that has suffered from the loss of their industrial base when the over 100-year-old Plainwell Paper Mill shut down in November of 2000. At one point the company comprised 18% of the City’s taxable value and employed over 400 people. The 36-acre property continues to sit idle. The City is seeking ways to attract new business and entrepreneurs to help grow the economy. 5/1/2009

12/31/2009

$

231,000

This construction project is for energy efficient green building renovations at the 119 N. Main St., Plainwell, Michigan. The Craftworks Foundation is set to rent the historic building for ten years once it becomes LEED project certified. As well as creating a green energy efficient structure, the building would serve as a LEED model for other rural downtowns and our community. 119 N. Main St. is located near the main downtown intersection and therefore should be one of the business district’s anchors but unfortunately has been vacant for three years. The local foundation will establish craft artist small business incubator at this location once the renovations are complete. A low-income housing apartment is on the upper floor and could be used as a live work space. Plainwell is located along the Kalamazoo River, and is a rural community that has suffered from the loss of our industrial base when the over 100year-old Plainwell Paper Mill shut down in November of 2000. At one point the company comprised 18% of the City’s taxable value and employed over 400 people. The 36-acre property continues to sit idle.The community desires to attract new entrep5/1/2009

12/31/2009

$

396,000

s

t s e

Route (Infrastructure Only)

D VE

12/31/2009

A T

CraftWORKS! Foundation

Expected Completion Date

O N

u q e

R d

CraftWORKS! Foundation 14128 S. Lake Doster Dr. Plainwell MI 49080

Plainwell

02262009

i m

e t tt

Plainwell LEED Construction for Historic Downtown Building

b u S

Submitted Requests - Not Approved

206 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

CraftWORKS! Foundation 14128 S. Lake Doster Dr. Plainwell MI 49080

Project Name

Project Description

Plainwell Historic Preservation and Adaptive reuse for Historic Downtown Building

Plainwell

Start Date

Expected Completion Date

This construction project is for historic preservation adaptive reuse renovations at the 119 N. Main St., Plainwell, Michigan downtown historic building to become ready for a ten year Foundation occupancy and use. 119 N. Main St. is located near the main downtown intersection and therefore should be one of the business district’s anchors but unfortunately it has been vacant for three years. We have a commitment from a local foundation to establish a craft small business inncubator once the renovations are complete. A low-income housing apartment is on the upper floor and could be used as a craft artist live-work space. Located along the Kalamazoo River, Plainwell, Michigan is a rural community that has suffered from the loss of their industrial base when the over 100-year-old Plainwell Paper Mill shut down in November of 2000. At one point the company comprised 18% of the City’s taxable value and employed over 400 people. The 36-acre property continues to sit idle. The City is seeking ways to attract new business and entrepreneurs to help grow the economy. 5/1/2009

T O

P P A

O R

The Millrace, located along Cranbrook Road south of Kingswood Lake and north of Lone Pine Road is an essential resource to the Cranbrook community as a diversion channel from Kingswood Lake to the Mill at Cranbrook Road. This channel is a trapezoidal channel, lined with an asphalt layer to reduce groundwater infiltration from the Millrace channel. The asphalt liner, over time, has experienced severe deterioration and consequently, the flowing water of the Millrace has been “leaking” into the groundwater and may be contributing to a flooding problem in the boiler room of the Brookside School. The Millrace Restoration project proposes to replace the asphalt lining of the Millrace channel with an impermeable geomembrane liner. The project goals consist of: ¨ Reducing or eliminating the groundwater infiltration from the Millrace channel, ¨ Providing a habitat to encourage a diverse ecological system, and ¨ Providing an aesthetically pleasing water resource on the Cranbrook campus. The proposed design for the Millrace consists of removing the asphalt from the channel, grading the channel to have consistent longitudinal and side slopes, covering the unde

12/31/2009

Funding Request

Route (Infrastructure Only)

D VE $

231,000

$

400,000 NA

$

16,000,000 N/A

N s

d e tt

t i m

ub

Cranbrook Educational Community Bloomfield Hills, Michigan Kingswood Girls' Middle School Project

S

02262009

t s e

qu

Cranbrook Educational Community Bloomfield Hills, Michigan Brookside Millrace

e R

The Kingswood Girls’ Middle School has for many years occupied the lower level of Kingswood, an area originally intended for recreational and service spaces in the original Saarinen design. While alterations and improvements have been made over the years, the layout of the spaces, the level of finish, and accesses to daylight have proved challenging. This proposed project includes the construction of a 48,000 square foot one story masonry building that will house 175 student and 25 faculty, administrators and staff. It also includes a drop off loop, visitor parking, a service drive, and restoration and improvements to the adjacent landscape. The building will house fifteen classrooms for 6th, 7th, and 8th grade girls, two computer classrooms, and art classroom, a library, a dining hall with kitchen and servery, a full size gymnasium with a fitness classroom and locker room, and administrative offices and support spaces. The entire project has been thoughtfully design with sustainable and environmentally sound considerations. The building has been designed to give the Girls’ Middle School program its own identity while incorporating design elements that

Submitted Requests - Not Approved

207 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Cranbrook Educational Community Bloomfield Hills, Michigan Kingswood Lake Restoration

Cranbrook Educational Community campus in Bloomfield Hills, Michigan has a history of flooding problems, and CEC has an interest in creating a more environmental sustainable campus with water resources as an aesthetic and educational focus. Because of this focus CEC has committed to the restoration of the campus's largest lake, Kingswood Lake (also known as Cranbrook Lake.) This impoundment is a key component for sediment and flow attenuation on the campus and for the Upper Rouge River Watershed. As part of this mutimillion-dollar restoration effort, Cranbrook conducted a smaller-scale "pilot" project in 2004/2005 that gathering exisiting data; identifying a portion of the lake to serve as a pilot area; completed dredging design and permitting of that pilot area; implemented the restoration; and developed the next phase of the restoration that encompasses the entire lake. For complete restoration of Kingswood Lake the following three components have been identified 1) Sediment Removal & Fisheries Habatit 2) Shoreline Retoration 3) Dam Restoration. By completing this project (CEC) would benefit from continued flood and resident protecti Spring 2009

Cranbrook Educational Community Bloomfield Hills, Michigan CEC Roofing Replacements

The Performing Art Center was constructed as a gynasiusm in 1927. In 1932 the building was expanded to include a stage along the south side, and an entrance addition to the west.Currently the space serves as a performance space. The road slope at roof areas, pitch and below the minumum recommended pitch of 2:12 for a batten seam roof. The roof should be fully replaced using a flat seem copper roofing system, which is acceptable for the existing low roof slope. Expansion joints are required with this type of roofing at approximately 30 feet intervals. This roofing system would have a 50 to 75 year life. The Wenger Gynmasium was constructed in 1965. Locations of gutter expansion joints, locations of downspout profiles were documented. We propose replacement of the roof with the batten seam copper roof using a historcially appropriate batten seam cooper roof. The Keppel Gymnasium was constructed in 1933. It consists of exterior lad bearing memory walls with an exposed steel truss roof and concrete panel deck. The roofing has reached its useful life and needs to be replaced. The existing roofing is copper batten seam roofing with ridge anSpring 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

Fall 2009

$

4,500,000 NA

12/9/2009

$

1,200,000 N/A

12/10/2009

$

21,400,000 N/A

N s

d e tt

t i m

ub

Cranbrook Educational Cranbrook Art MuseumClimate Control Community Bloomfield Hills, Michigan Systems and New Collections Wing

t s e

qu

e R

Cranbrook Art Museum is part of a major capital project which will include renovating the historic Eliel Saarinen-designed buidling; installing for the the first time museum quality climate control systems and build a new Collections Wing for the secure storage and preservation of our permanent collection. At the same time, the new Collections Wing has been designed in a way that will make the collection much more accessible to school groups and individual scholars alike. Part of our project will include quality storage systems for the main vault of the collection wing (which will allow school groups to study Cranbrook's world-reown furniture collection within the vault itself.) the shelving and storage systems for the glass-walled ceramics storage area, which represents another strength of the Art Museum's collection.) the cabinetry and shelving for the glass-waited print study room, and the cabinetry and furnishings for the collections seminar room-which is being designed using a classroom model.

S 02262009

Submitted Requests - Not Approved

208 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Crawford County

Project Name

Project Description

Start Date

Public Health

There are ten counties that fund the District #10 health department. The lion’s share of the budget however is funded through state and federal pass through dollars. Even though Crawford County spends close to $100,000 a year for public health services in this rural and impoverished area, our primary obligation is to ensure that there is an adequate facility in which public health may provide its needed services to the community. Public health service in Crawford County have been dispensed out of approximately 2,000 square feet leased from the our Mental Health Authority. District #10 Health Department has been housed in that building for over 15 years and has ou grown its space. District #10 Health Department is looking for a building that has at least 4,000 square feet and will allow for current and future storage along with privacy for the clinical programs run out of the office. In their present location, there is very little privacy afforded to clients as they seek services they could not otherwise acquire This is becoming a serious challenge for Public Health as they try to maintain the delivSummer 2009

City of Grayling

Commission on Aging Building

The Crawford County Commission on Aging (COA) is a component unit of the County The COA serves 44,000 meals each year for a growing senior population in the rural and impoverished area of Crawford County. Aside from meals, the COA provides respite care for caregivers, home care and personal care for those seniors unable to provide for themselves and makes available a range of activities/events throughout the year for our senior population. In total, the Crawford County Commission on Aging touches the lives of 1,700 seniors in our community throughout the year. The COA leases space from the Grayling Housing Commission this space includes offices, a commercial kitchen, dining area and an activities area. The Grayling Housing Commission has indicated that federal Housing and Urban Development (HUD) has questioned the lease arrangement it has with the COA. HUD is evaluating the arrangement and may determine that it is not appropriate for the COA to remain in that location. In any event the COA has determined that it needs approximately 12,000 square feet to adequately serve the seniors of our community. During the last Fall 2009

City of Grayling

With two agencies that Crawford County that require additional and updated accommodations it seems only natural that we should explore the possibility of a joint project. The Crawford County Commission on Aging (COA) serves 44,000 meals each year for a growing senior population in the rural and impoverished area of Crawford County. Aside from meals, the COA provides respite care for caregivers, home care and personal care for those seniors unable to provide for themselves and makes available a range of activities/events throughout the year for our senior population. In total, the Crawford County Commission on Aging touches the lives of 1,700 seniors in our community throughout the year. The Grayling Housing Commission which leases space to the COA has indicated that federal Housing and Urban Development (HUD) has questioned the lease arrangement it has with the COA and that it may not be allowable. Public health services in Crawford County have bee dispensed out of approximately 2,000 square feet leased from the our Mental Health Combined Building for COA and Public Health Authority. Having been housed in that building for over 15 years they have outgrown tSummer 2009

City of Grayling

A T

s

Crawford County

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

Summer 2010

$

1,000,000

Summer 2010

$

2,000,000

Summer 2010

$

2,000,000

O N

u q e

R d

Crawford County

e t tt

ub

i m

S 02262009

Submitted Requests - Not Approved

209 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Crawford County

City of Grayling

Project Name

Project Description

Start Date

County Building Renovation

The Crawford County building was built in 1969. Most county agencies are housed in this facility along with the 46th unified trial court. There are many instances in which employees share offices due to the shortage of space. Storage facilities have been added or created to manage the voluminous amount of paper that needs to be retained in government. The building itself was built as a block building with large open spaces. We have since created offices in existing places as needs arise but without the benefit of future planning. Since that time our population has doubled. The current building is too small and is not compliant with the Americans with Disabilities Act (ADA.) Additionally, the building has much inefficiency with regards to its layout and energy consumption. The County spent two years investigating new sites for a new building. After a great deal of investigation, it was decided that the current building and location was the most beneficial to our community. In May of 2006, a conceptual design study was completed. This study analyzed the current condition of our building and forecasted the future needs that the County could expect Summer 2009

Crawford County

City of Grayling

Hatchery

4,000,000

The Grayling Fish Hatchery Museum Project is at a point where the building itself is ready for total renovation. This will provide the Grayling/Crawford County area a unique tourist attraction expected to provide both full time and seasonal employment in the economically depressed community. These are in addition to the immediate jobs provided for construction workers. Efforts in recent years, funded in part by United States Department of Agriculture Rural Business Enterprise Grants totaling over $80,000 and local donations in excess of $30,000 have allowed for: building analysis, roof replacement, water damage repair, painting, asbestos abatement, trip hazard repair, walkway replacement and a variety of other projects. In the end a historical building would be useable for: community gatherings, office space for environmental organizations, educational opportunities surrounding the history of the area along with being a museum. Fall 2009

Summer 2010

$

1,500,000

The Crawford County Commission on Aging (COA) serves 44,000 meals each year for a growing senior population in the rural and impoverished area of Crawford County Aside from meals, the COA provides respite care for caregivers, home care and personal care for those seniors unable to provide for themselves and makes available a range of activities/events throughout the year for our senior population. In total, the Crawford County Commission on Aging touches the lives of 1,700 seniors in our community throughout the year. The Grayling Housing Commission has indicated tha federal Housing and Urban Development (HUD) has questioned the lease arrangement it has with the COA. HUD is evaluating the arrangement and may determine that it is not appropriate for the COA to remain in that location. The existing Grayling Fish Hatchery Building can be renovated to provide adequate space and utility for the Senior Center, in conjunction with the Grayling Fish Hatchery Museum. This joint use of a historic building is an ideal solution to serious needs within the Crawford County community. The Hatchery building itself is ready for complete renovaSummer 2009

City of Grayling

Summer 2010

$

2,500,000

st

t i m

Commission on Aging at the Hatchery

q e R

s

Route (Infrastructure Only)

D VE $

e u

d e tt

PP

O R

Funding Request

Summer 2010

A T

Crawford County

Expected Completion Date

O N

b u S 02262009

Submitted Requests - Not Approved

210 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Crawford County

Project Name

Project Description

Start Date

Although this may be the most costly option, this option would create the most synergy of all of the projects Crawford County is currently considering. The Grayling Fish Hatchery is at a point where the building itself is ready for total renovation. Aside from providing some 44,000 meals, the COA provides respite care for caregivers, home care and personal care for those seniors unable to provide for themselves and makes available a range of activities/events throughout the year for our senior population. In total, the Crawford County Commission on Aging touches the lives of 1,700 seniors in our community throughout the year. The Grayling Housing Commission which leases space to the COA has indicated that federal Housing and Urban Development (HUD) has questioned the lease arrangement it has with the COA and that it may not be allowable. Public health services in Crawford County have bee dispensed out of approximately 2,000 square feet leased from the our Mental Health Combined Building for COA and Public Health Authority. Having been housed in that building for over 15 years they have outgrown their space. District #10 Health Department is looking for a building that has at least 4Spring 2010 @ the hatchery

City of Grayling

Expected Completion Date

T O

P P A

O R

D VE

Summer 2011

Grayling Michigan is in the center of northern Michigan in the Lower Peninsula. Grayling, along with Crawford County are bisected north and south by I-75 and US127 along with M-72 east and west. When I-75 was constructed Grayling was left without a four-way interchange. Mile marker 254 will allow I-75 north bound traffic to exit or south bound traffic to enter. Meanwhile, at mile marker 256, south bound I-75 traffic can exit but only north bound traffic can merge on to I-75. Repeatedly, one of our major obstacles sited in recruiting business and jobs to our area is the lack of a 4way interchange. A traffic study was completed in 2009 for the purposes of analyzing the flow of traffic through the area and identifying the most logical location to place a 4 way interchange. The traffic study identified the North Down River Road (mile marker 256) interchange as the most logical place to construct the four-way interchange. The North Down River Road site was selected predominately due to cost. The entrance to south bound I-75 can be constructed using a cloverleaf within the property already ow

Funding Request

Route (Infrastructure Only)

$

3,000,000

$

10,000,000

$

6,000,000

N s

Crawford County

t s e

Grayling Township

Four-Way interchange

Creative Learning Academy of Science, Mathematics, and Humanities

Beaverton

Creative Learning Academy of Science, Mathematics, and Humanities

Creative Learning Academy of Science, Mathematics, and Humanities

Beaverton

Creative Learning Academy of Science, Mathematics, and Humanities

Creative Learning Academy of Science, Mathematics, and Humanities

Beaverton

Creative Learning Academy of Science, Mathematics, and Humanities Creative Learning Academy of Science, Mathematics, and Humanities

Beaverton

Beaverton

02262009

R d

e t t

To construct an Elementary (Grades K-8) Facility by GREEN standards.

Update and modernize media equipment in all classrooms to allow for video streaming, connection broadcast systems, projection systems for teachers.

9/1/2009

$

20,000

Creative Learning Academy of Science, Mathematics, and Humanities

Equipment for expanding humanities, arts, and recreation programs to include collapsible risers, playground equipment, etc.

9/1/2009

$

40,000

Creative Learning Academy of Science, Mathematics, and Humanities

Replace carpeting and furniture, by GREEN standards, in current facility. Update electrical system and add built in back up generator for this rural school. Repair entrances to provide security for students/staff. Improve insulation and repair current roof in facility.

9/1/2009

$

60,000

Creative Learning Academy of Science, Mathematics, and Humanities

To enhance technology with fiber optic connection with local RESD, wireless broadband connectivity, update and modernize 10 year old computer lab, classroom smart boards, updated laptops for teachers. Green standards would be applied.

9/1/2009

$

80,000

t i m

ub

S

u q e

Submitted Requests - Not Approved

211 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Creative Montessori Academy Southgate

Project Name

Project Description To enhance technology with wireless broadband connectivity, two modern computer labs, and classroom smart boards.

Creative Montessori Academy

Start Date

8/1/2009

Creative Spirit Center, Homer Township near Restoration of John Pratt Mosaic House in Inc. Midland in Midland County Midland County, MI

Demolish and restore the interior of a 1,000 square foot house in Homer Township. Exterior walls are covered with mosaic art, a treasure of folk or naïve art created by the late John Pratt, a Midland County resident. Late in his life after coping with mental illness (paranoid schizophrenia), he was able to give expression to his artistic vision in creating these mosaics on the walls of his childhood home. The interior has suffered water damage and is uninhabitable, and eventually if not restored will result in the destruction of the art on the exterior walls. The interior will be restored to provide 2 artists' studios and accommodations for an artist-in-residence program. 9/1/2009

Crescent Academy

Crescent Academy Secondary Building

Purchase of already renovated office building to be used as a public charter school middle school and highschool. Five elementary public charter schools are in the immediate area of the building.

CrimFit Youth Program - Flint

The Crim Fitness Foundation, founded by former House Speaker Bobby Crim, has been providing fitness programs for children and adults in Flint for over 30 years. Today the CrimFit Youth Program provides structured, results oriented physical fitness programs in all 23 Flint Public Elementary Schools. Funding for these programs will expire in May 2009, leaving a significant gap in access to vital services for Flint youth. As the state with the third highest rate of obesity in the U.S., Michigan has reason to be concerned with the associated costs. In 2001, obesity-related health expenditures were roughly $117B, nearly half of which was publicly financed through Medicaid and Medicare. Experts consider increasing physical activity the single most important factor in reducing obesity. In addition to its health benefits, research consistently shows that physical activity improves school performance and is associated with higher self esteem and achievement. Because obese children are likely to become obese adults, establishing healthy physical activity habits in children is critical to preventing obesity in this population. The Crim Fitness Foundation seeks fASAP

Industrial Park Sanitary Sewer

Construct 2,600' of sanitary sewer and pumping station within the Township Industrial Park located off of M-104. Sanitary sewer service to provide additional business opportunities to existing and future businesses. 9/9/2009

Southfield

Expected Completion Date

O R

$

150,000

D VE $

125,000

$

8,000,000

5/11/2009

$

1,375,000

11/9/2009

$

550,000

Construct 7,200' of 12" water main on State Road, from Apple Drive to 112th Avenue. Improvements to provide system reliability, looping, improved fire flows and recommended in their recent MDEQ reliability study as system priority. 9/9/2009

11/9/2009

$

600,000

Apple Drive Water Main

Construct 3,800' of 12" water main on State Road, from dead end, east of 130th Avenue to dead end on Apple Drive and 1,800' of 8" water main on Apple Drive from the dead end on State Road. Improvements to provide system reliability, looping, improved fire flows and recommended in their recent MDEQ reliability study as system priority. The MDEQ has threatened limiting system extension if this loop was not completed in the immediate future. 9/9/2009

11/9/2009

$

650,000

M-104 and 136th Water Main

Construct 6,500' of 12" water main on Cleveland (M-104), from 144th to 136th Avenue. Construct Water Main on 136th Avenue from Cleveland to Leonard Road, along with Cone Street. Improvements to provide system reliability, looping, improved fire flows and recommended in their recent MDEQ reliability study as system priority. 9/9/2009

11/9/2009

$

1,100,000

Community Center Renovation

Renovation of Facility Purchased for a Community Center to include Fitness and Physical Therapy Areas

12/1/2009

$

700,000

T O

P P A

12/15/2009

Funding Request

Route (Infrastructure Only)

N s

Crim Fitness Foundation

Flint

Crockery Township

Crockery Township

Crockery Township

Crockery Township

i m

Crockery Township

Crockery Township

S

Crockery Township

Crossroads Community Center, Inc City of Reed City

02262009

u q e

R d

e t tt

State Road Water Main

ub

Crockery Township

t s e

Submitted Requests - Not Approved

8/1/2009

212 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Crossroads Community Center, Inc City of Reed City

Community Center Project

Acquisition of Property and Development of a Community Center

11/1/2009

7/1/2010

Crossroads Community Center, Inc City of Reed City

Community Center Property Acquisition

Puchase of Property for the purpose of developing a Community Center

5/1/2009

6/1/2009

Croton Twp Community Building

Croton Twp has an old fire barn building that is in dire need of repair. Plans for the building include combining the Post Office, Library, and a Community Hall. This will allow for increased efficiencies and opportunities for collaboration. The building will be re-roofed and re-faced, among other improvements, to make it an attractive asset for the community. 5/1/2009

DEAW Environmental Revitalization Project

The Academy plans for the revitalization of a school building. The project will include (1) revamping a 50-year old boiler to a geo thermal system, (2) installation of thermal windows to improve energy efficiency, (3) design of our landscaping structures inclusive of planting sod, trees, and providing additional playscapes for students and the community, (4) improved outside lighting, (5) safety gates, (5) demolition of on-site deteriorated building to expand green area.

The daVinci Primary School Addition/Renovation

Construction and/or renovation of four classrooms and space for support services. Includes 2800 square feet for classroom construction or renovation and additional 1200 square feet for support services such as Counselor Office, Computer Lab and other tutorial space.

Croton Township

Croton Twp

David Ellis Academy West 19800 Beech Daly Rd. Redford, MI 48240 Redford, Michigan

daVinci Institute

Jackson

Davison Township

Davison Twp

Building Energy Update

Dearborn Academy Deerfield Public Schools

Dearborn MI

TDA Renovation

Deerfield

heat/HVAc system upgrade

Delhi Township

City of Lansing/Delhi Charter Township, Ingham Project No. 15 County Station

Delhi Township

City of Lansing/Delhi Township

Delhi Township

Delhi Charter Township, Ingham County

Project No. 15 Station

t i m

Project No. 5 Sewage Pumping Station Improvements for Lift Station D

b u S

Project No. 5 Sewage Pumping Station Improvements for Lift Station D

Delhi Township

Delhi Township

Delhi Township

City of Lansing/Delhi Charter Township, Ingham Project No. 14 County Improvements City of Lansing/Delhi Project No. 14 Township Improvements

Delhi Township

02262009

West Town Drain West Town Drain

D VE $

435,000

$

2,700,000

8/1/2010

$

500,000

12/1/2009

$

675,000 N/A

9/1/2010

$

2,500,000

8/1/2009

$

400,000

Installation of new water booster station with new valves in existing system to increase water supply for existing commercial and industrial fire protection. Summer 2009

11/10/2009

$

1,000,000

Installation of new water booster station with new valves in existing system to increase water supply for existing commercial and industrial fire protection. Summer 2009

11/1/2010

$

1,000,000

Installation of three additional pumps along with a new forcemain including road restoration for two (2) miles necessitating the enclosure of a road ditch. Entire route would include a shared use pathway. Along Grovenburg Drain from Aurlius Road west to Grovenburg Road. Fall 2009

12/1/2010

$

10,000,000

12/1/2010

$

Along Grovenburg Drain from Aurelius Road west to 10,000,000 Grovenburg Road

11/10/2009

$

2,000,000

11/1/2010

$

2,000,000

T O

-N

s t s

eq

2/1/2010

Installation of three additional pumps along with a new forcemain including road restoration for two (2) miles necessitating the enclosure of a road ditch. Entire route would include a shared use pathway. Fall 2009 Clean out, widen, restore and replace tile and open channel stabilization a significant length of the West Town Drain in Ingham County. Summer 2009 Clean out, widen, restore and replace tile and open channel stabilization a significant length of the West Town Drain in Ingham County. Summer 2009

Submitted Requests - Not Approved

O R 12/31/2009

P P A

R d

e t t

3,000,000

176,000

e u

Water Booster Pumping

$

$

Project will consist of replacement of antiquated heating and cooling system to new 90% Energy Star equipment. Modifying existing lighting & electrical communications to new energy standards . Office reconfiguration to provide for additional space to expand present services and create room for new operations in Building & Planning Department.Reconfigure building entrances to provide for more energy efficient building envelope. 7/1/2009 Renovations and repairs to existing charter school facility, including the construction o a new gymnasium and library. 9/1/2009 replace and upgrade heating units in 30 class rooms. Electronic controls to better be able to control temperature and save on energy costs. 6/1/2009

Water Booster Pumping

Funding Request

Route (Infrastructure Only)

213 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Delhi Township

Delhi Charter Township, Ingham County

Project Name

Project Description

Start Date

Project No. 7 Remodel Township Hall to Obtain Energy Efficiency and Sustainability

Renovations to the existing Township Hall would include a geo-thermal HVAC system a metal roof, window treatments, new lighting fixtures and permanent standby power. Summer 2009

8/1/2010

12/1/2010

Delhi Township

Delhi Charter Township, Ingham County

Project No. 6 Pine Tree Road Sewage Pumping Station

Relocation of thirty year old sewage pumping station from the south side of Sycamore Creek to the north side. Included in the improvements would be ADA restrooms accessible to the public using our adjacent 40-acre natural park and non motorized pathway. Summer 2009

Delhi Township

Delhi Charter Township, Ingham County

Project No. 12 Complete Construction of Veterans Memorial Gardens

Veterans Memorial Gardens is located in the center of Holt and is approximately two thirds complete. The final construction phase needs to include a bandshell, shareduse pathways and two side gardens with walkways. Summer 2009

Delhi Township

Delhi Charter Township, Ingham County

Project No. 8 Fiber Optic Connectivity between All Municipal and School Facilities

Installation of a fiber optic ring that would utilize existing school facilities fiber optic lines creating redundant fiber connections to all major municipal owned facilities and provide single fiber optic lines to 13 sewage pumping stations. Summer 2009

Delhi Township

Delhi Charter Township, Ingham County

Project No. 10

Extend a new gravity sewer from an existing lift station north along College Rd about College Road Sanitary Sewer one half mile then west along Holt Rd approximately one half mile. Summer 2009

T O

Delhi Township

Delhi Charter Township, Ingham County

Project No. 13 Construction of Two New Restrooms/ Pavilions

Delhi Township

Delhi Charter Township, Ingham County

Project No. 11 Replace/Install Playground Equipment at Three Township Parks

Install new ADA and age appropriate playground equipment at three existing parks (Kiwanis Park, Jaycee Park, and Deadman’s Hill).

Delhi Charter Township, Ingham County

Construction of a shared-use path from its current terminus at Maple Ridge Cemetery Project No. 9 North Trail Connector from west one quarter (1/4) mile along Willoughby Road then north one mile along the Willoughby Rd (cemetery) North to chain of lakes and continuing one and one half miles northwest along Sycamore Cree Jolly/Aurelius Rd Intersection under I-96.

Delhi Township

Delhi Township

Project No. 6 Pine Tree Road Sewage Pumping Station

Delhi Township

Delhi Township

Project No. 7 Remodel Township Hall to Obtain Energy Efficiency and Sustainability

Delhi Township

Project No. 8 Fiber Optic Connectivity between All Municipal and School Facilities

Delhi Township

Delhi Township

Delhi Township

Delhi Township

Delhi Township

e t tt

i m

Delhi Township

Delhi Township

Project No. 12 Complete Construction of Veterans Memorial Gardens

Delhi Township

Delhi Township

Project No. 11 Replace/Install Playground Equipment at Three Township Parks

2,200,000

D VE

2,500,000

$

1,000,000

8/1/2010

$

1,000,000

9/10/2009

$

1,500,000

11/10/2009

11/10/2009

$

750,000

Summer 2009

11/10/2009

$

750,000

11/10/2009

$

3,000,000

12/1/2010

$

2,500,000

Renovations to the existing Township Hall would include a geo-thermal HVAC system a metal roof, window treatments, new lighting fixtures and permanent standby power. Summer 2009

8/1/2010

$

2,200,000

Installation of a fiber optic ring that would utilize existing school facilities fiber optic lines creating redundant fiber connections to all major municipal owned facilities and provide single fiber optic lines to 13 sewage pumping stations. Summer 2009

8/1/2010

$

1,000,000

11/1/2010

$

9/1/2010

$

See Project 3,000,000 Description See Project 1,500,000 Description

t s e

u q e

Relocation of thirty year old sewage pumping station from the south side of Sycamore Creek to the north side. Included in the improvements would be ADA restrooms accessible to the public using our adjacent 40-acre natural park and non motorized pathway. Summer 2009

Construction of a shared-use path from its current terminus at Maple Ridge Cemetery Project No. 9 North Trail Connector from west one quarter (1/4) mile along Willoughby Road then north one mile along the Willoughby Rd (cemetery) North to chain of lakes and continuing one and one half miles northwest along Sycamore Cree Jolly/Aurelius Rd Intersection under I-96. Summer 2009 Extend a new gravity sewer from an existing lift station north along College Rd about Project No. 10 College Road Sanitary Sewer one half mile then west along Holt Rd approximately one half mile. Summer 2009

ub

$

Route (Infrastructure Only)

Summer 2009

R d

S

02262009

N s

Funding Request

$

O R

P P A

Demolish old restroom facilities at Valhalla Park and Kiwanis Park and install new restrooms with ADA accommodations along with adjoining pavilions and storage rooms.

Delhi Township

Expected Completion Date

Veterans Memorial Gardens is located in the center of Holt and is approximately two thirds complete. The final construction phase needs to include a bandshell, shareduse pathways and two side gardens with walkways. Summer 2009

11/1/2010

$

1,000,000

Install new ADA and age appropriate playground equipment at three existing parks (Kiwanis Park, Jaycee Park, and Deadman’s Hill).

11/1/2010

$

750,000

Submitted Requests - Not Approved

Summer 2009

214 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Delhi Township

Delta County

Depot Town Community Development Corporation

Delhi Township

Wells Township, Delta County

Project Name

Start Date

Project No. 13 Construction of Two New Restrooms/ Pavilions

Demolish old restroom facilities at Valhalla Park and Kiwanis Park and install new restrooms with ADA accommodations along with adjoining pavilions and storage rooms.

Escanaba River Restoration Project, Delta County

Funding will be used for removal of collapsed bridge sections and residual pilings from the navigable waters of the Escanaba River thereby restoring the River to safe recreational and commercial use. The old U.S. Highway 41 bridge over the Escanaba River was abandoned when the highway was relocated further upstream. The concrete bridge has deteriorated into an blighted and unsafe condition in danger of further collapse, blocking navigation on the river. In addition to the collapsed bridge posing a danger to navigation and public safety, it significantly detracts from the beauty of the river and poses a barrier to further economic development along the riverfront. Delta County is requesting funds to remove the bridge and restore the river to a safe and navigable condition. The plan is to remove the concrete bridge (approximately 750 feet in length), remove the adjacent old trolley bridge, recycle and dispose of the materials, remove all pilings (300 plus) and other man-made obstructions to navigation, and restore the river bed and bank to a natural condition.

Riverside and Frog Island Parks Border-toBorder Trail

Washtenaw County envisioned a 35-mile pathway for cyclists, joggers and pedestrians that crossed the county, largely near the Huron River nearly a decade ago. The non-motorized trail passes through both Riverside and Frog Island Parks, however the trail is in need of resurfacing and does not meet safety or design standards set by the county. The project would expand and realign the path network to improve functionality and increase useable space. Proposed improvements facilitate the trail along the berm west of the soccer field in Frog Island Park. It would also provide seating for spectators through permanent seating on the west side of the soccer field, providing slope stabilization along with increased functionality. In Riverside Park, the existing curvilinear circulation pattern is enhanced and extended to improve functionality and increase useable space. A proposed path extends along the river at the south end of the park creating a new loop to the Riverside Arts Center. Existing paths would be resurfaced and where indicated on the plan upgraded to accommodate the minimum 10 foots width and other standards for the Border-to-Bord 9/7/2009

Frog Island Park is located immediately upstream from Riverside Park and the parks are linked by an existing pedestrian bridge in the center of Ypsilanti. Frog Island Park provides a diversity of park functions. The park provides active and passive recreation space to the community, and is home to events and festivals. With the city's diminished fiscal capacity, funding for park improvements and maintenance will come primarily from park programming and special events revenue. The park is currently operated and maintained by a non-profit organization, the Depot Town Community Development Corporation. Providing a new band shell at Frog Island would allow the park to become a venue suitable for special events as well as local groups such as the Ypsilanti Community Band. Such a venue could give Ypsilanti more regional recognition, encourage cultural programming and generate significant revenue for the park. The shell could also function as a shelter for small gatherings and day-to-day use. The shell would be designed to encourage and facilitate use for a variety of performing arts. 7/17/2009

T O

Summer 2009

11/1/2010

O R

P P A

Funding Request

$

Route (Infrastructure Only)

750,000

D VE $

1,970,000

8/19/2011

$

1,065,167

6/11/2010

$

258,840

N s

Ypsilanti

d e tt

Depot Town Community Development Corporation

Project Description

Expected Completion Date

t i m

Ypsilanti

02262009

b u S

Frog Island Park Band Shell & Pavillion

t s e

qu

e R

Submitted Requests - Not Approved

215 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Depot Town Community Development Corporation Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences Detroit Academy of Arts and Sciences

Project Name

Project Description

Start Date

Ypsilanti

Riverside Park Bridge

Riverside Park is the center piece of Ypsilanti's riverfront park system. Located between the Downtown and Depot Town Business Districts the space provides a diversity of park functions. The Park is home to numerous events and festivals, but also functions as a passive open space retreat for many local residents. Riverside Park is a valuable asset to the City of Ypsilanti, yet many visitors pass by on Michigan Avenue without ever knowing it is there. In addition, physical access to the park is limited to a steep set of stairs and an inconspicuous driveway shared with local businesses. A proposed tridge (bridge with three access points) would replace the existing steps and add an ADA ramp from the east side of the Michigan Avenue road bridge. Illuminated archways with park name would announce the park and frame pedestrian entries on both sides of the road bridge. Improved access to the park from the south would encourage more residents to utilize the parks and tie into the city's plan for the redevelopment of the Water Street project, which is across the street on Michigan Avenue. 9/7/2009

Detroit

DAAS Jefferson

Removing boiler system to put in HVAC system

Detroit

DAAS Jefferson

Limestome Sill Repair

Detroit

DAAS Medbury

Window Replacement

Detroit

DAAS Jefferson

Window Replacement

Detroit

DAAS Medbury

connect buildings with walkways

Detroit

DAAS Medbury

Detroit

Daas Jefferson

Detroit

DAAS Medbury

Detroit

DAAS Jefferson

Detroit

DAAS Medbury

Detroit

DAAS Jefferson

Detroit

DAAS Jefferson

b u S

tt i m

DPTV is located in Wixom and broadcasts to residents and families throughout southeast Michigan. In addition, DPTV provides online programs and content to Detroit Educational Detroit Public TV Because Minds Matter Television Foundation anyone with an internet connection. Capital Campaign (DPTV)

02262009

P P A

O R

Funding Request

$

553,740

4/1/2009

10/1/2009

$

450,000

3/1/2009

5/1/2009

$

45,000

5/1/2009

8/1/2009

$

50,000

5/1/2009

8/1/2009

$

175,000

7/1/2009

9/1/2009

$

12,000

Building a storage garage for supplies/deliveries

5/1/2009

7/1/2009

$

20,000

Parking Lot Paving

6/1/2009

7/1/2009

$

40,000

Paving Alley Ways

6/1/2009

7/1/2009

$

60,000

connect buildings with walkways

7/1/2009

9/1/2009

$

115,000

Parking Lot Paving

6/1/2009

7/1/2009

$

140,000

remove chair lift and put in ramp for wheel chairs

7/1/2009

8/1/2009

$

160,000

Roof Repair

5/1/2009

7/1/2009

$

250,000

7/1/2009

$

4,400,000

s t s

T O

-N

q e R

Construct 3 new digital (HDTV) studios at the Riley Broadcast Center in which educational, cultural, employment, training, health, news and public affairs programs will be produced for the millions of public and commercial viewers in southeast Michigan. The need for this project was necessitated by the FCC's unfunded mandate requiring TV broadcasters' conversion to digital technology in 2009. Studio construction was postponed when the recession of the past two years caused crippling reductions in private, foundation and corporate contributions. Stimulus package funding for this project would effect the immediate re-start of construction. Most important, it would speed up delivery of local information (see above) needed in this depressed region and allow DPTV to maintain core commitments with Wayne State University to produce education content; continue Arts and Culture programs promoting the Detroit Symphony Orchestra, the Detroit Institute of Arts and The Sphinx Organization and launch JOBS NOW! apprising southeast Michigan of workforce opportunities on a daily basis. 3/15/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

8/8/2011

e u

d e t

Expected Completion Date

216 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Detroit Historical Society

Detroit

Project Name

Project Description

Start Date

Dossin Great Lakes Museum (Dossin) Renovation and Expansion

The Dossin Great Lakes Museum (Dossin), southeast Michigan’s only maritime museum, is owned by the City of Detroit and operated by the Detroit Historical Society (DHS), and independent non-profit 501c3 organization. While the Dossin remains a popular educational and historical resource for school children, adults and maritime enthusiasts from around the state, immediate capital investment is critical to sustaining operations at this location. The Dossin is a 1960s era building in need of significant capital investment to support its aging and marginally maintained infrastructure. The building is in below average condition, with major systems and important infrastructure components showing severe signs of age and deferred maintenance. Further, the museum lacks many modern amenities including proper lighting, efficient heating and cooling systems, reliable security systems, adequate electrical service, insulation and energy efficient windows. The Society has moved forward with a preliminary plan to enhance the facility in compliance with the criteria cited for energy efficient and environmentally sustainable LEED certified buildings. Th 7/1/2009

Collections Resource Center (CRC)

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

2/1/2010

$

3,000,000

This Collections Resource Center (CRC) serves to preserve, protect, store and conserve a priceless collection of rare and historic artifacts that chronicle the history of Detroit and southeast Michigan. The collection is owned by the City of Detroit; the Detroit Historical Society, an independent 501c3 organization manages the collection and operates the facility. The CRC is housed on the grounds of Historic Fort Wayne in aging World War II-era block buildings. While some CRC structures are secure and climate controlled, several other buildings have no climate control and poor security. Theses aging structures lack modern windows, proper insulation and energy efficient heating, cooling and ventilation systems. Proposed plans to renovate the existing CRC buildings and build a new structure present a major opportunity to improve the efficiency and environmental sustainability of these facilities. We expect to construct an energy efficient and environmentally sustainable LEED certified building. The final design will align with the LEED Green Building Rating System, with special emphasis on ensuring that the site is environmentally sustainable, use of water for all purposes i 4/1/2009

12/1/2009

$

3,500,000

The Detroit Historical Museum (DHM) was built in 1951 and contains 78,900 square feet of exhibition and office space. The museum is owned by the City of Detroit; operations are managed by the Detroit Historical Society (DHS), an independent 501c3 non profit organization. The existing building is in average condition; major systems and infrastructure components are several decades old. The museum lacks modern and efficient amenities including proper lighting, efficient heating and cooling, reliable security systems, modern elevators, adequate electrical service, proper drainage and plumbing systems, insulation and energy efficient windows. Further, several museum exhibits need upgrades or replacement. The Society has engaged a professional architecture and design firm to develop an environmentally sustainable LEED certified plan renovation and addition plan that will update the museum and add approximately 20,000 square feet. Our design aligns with the LEED Green Building Rating System and places special emphasis on ensuring that the site is environmentally sustainable, the use of water for all purposes inside and outside is eff 4/1/2009

10/1/2010

$

35,900,000

T O

Detroit Historical Society

Expected Completion Date

N s

Detroit

t s e

u q e

R d

Detroit Historical Society

i m

e t tt

ub

Detroit

Detroit Historical Museum (DHM)

S 02262009

Submitted Requests - Not Approved

217 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Detroit Institue of Arts Detroit

Project Name

Project Description

Start Date

Expected Completion Date

Cultural Center Parking/Electric Vechical Charging Stations

The Detroit Institute of Arts, a City of Detroit-owned comprehensive art museum, is requesting supporting the amount of $15,000,000 for the building of a 900-1,000 space parking deck on the Cultural Center surface parking lot and remediation of the Farnsworth Garage, including the capacity to charge electric vehicles in both facilities. The project aligns directly with the Michigan Economic Recovery qualifying criteria. This innovative project, which will employ cutting-edge technology, is shovel-ready, will be completed within two years, will preserve and create employment in the City of Detroit, will be financially sustainable and has significant emphasis on the use of green technology. Currently, the Cultural Center has limited parking for its anchor institutions—The Detroit Institute of Arts, New Detroit Science Center, and Charles A. Wright Museum of African American History. Adding to the parking shortage will be the opening of New Detroit Science Center School in September 2009. The DIA has been in discussions for several months to address the additional need for parking and the financial and safety liabilities of the Farnsworth garage. During this exploratory ph 5/1/2009

Energy Efficiency Plan

The Detroit Institute of Arts, a City of Detroit-owned comprehensive art museum, is requesting support in the amount of $5,000,000 for a sweeping energy efficiency plan aimed at reducing our energy consumption and annual operating expenses. The DIA would realize an estimated 15% - 20% annual reduction in energy usage and utility expenses with the completion of three critical upgrades: the conversion of our lighting system from fluorescent bulbs to LED lighting; installation of an Air Economizer and replacement of the north and central sections of the roof (75%) that currently require remediation. To achieve reductions in energy consumption and costs, in 2007 the DIA approached DTE Energy to be a test site for LED lighting. We have successfully tested and are ready for a complete conversion and installation of LED lights in nongallery spaces. The implementation of this green technology would eliminate our use of compact fluorescent bulbs and reduce our use of T 5 fluorescent ballasts. We would achieve a 50% energy savings with the conversion and realize an estimated $20,000 in annual saving. Inspection of the north and central roof identified significant4/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

11/1/2010

$

29,000,000

6/30/2010

$

5,000,000

6/1/2010

$

150,000

N s

Detroit Institue of Arts Detroit

d e tt

Detroit Institue of Arts Detroit

02262009

t i m

S

ub

Thinking Through Art

t s e

qu

e R

The Detroit Institute of Arts, a City of Detroit-owned comprehensive art museum, is requesting support in the amount of $150,000 for Thinking Through Art which targets 3rd through 5th grade students in disadvantaged public schools utilizing an innovative arts curriculum known as Visual Thinking Strategies (VTS). TTA consists of eight classroom-facilitated discussions of works of art utilizing VTS over the course of a school year, culminating in a museum visit that includes an art-making studio experience. Created by Visual Understanding in Education, VTS is based on research into the process of developing aesthetic understanding of art by examining objects and communicating a range of observations in a lively, student-centered environment. Students are shown multiple images of fine art that are then discussed and expanded upon. From the start, teachers reported on the many ways that the method supports development of learning habits necessary to excel in other subjects. This unexpected outcome prompted over ten years of longitudinal study in school districts across the nation to test these observations. The evidence overwhelmingly supports the reasonin6/1/2009

Submitted Requests - Not Approved

218 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Detroit Institue of Arts Detroit

Project Name

Project Description

Start Date

Expected Completion Date

Art Discovery

The Detroit Institute of Arts, a City of Detroit-owned comprehensive art museum, is requesting support in the amount of $150,000 for the DIA’s exciting, innovative Art Discovery program has helped to fill a gap in arts education in the Detroit Public Schools, providing 3rd-5th-graders with multiple visits to the museum to discuss and make art. Art Discovery was praised by the Detroit Free Press as “something that should be available to thousands more students.” Art Discovery also utilizes the innovative arts curriculum known as Visual Thinking Strategies (VTS). Created by Visual Understanding in Education, VTS is based on research into the process of developing aesthetic understanding of art by examining objects and communicating a range of observations in a lively, student-centered environment. Students are shown multiple works of fine art that are then discussed and expanded upon. From the start, teachers reported on the many ways that the method supports development of learning habits necessary to excel in other subjects. This unexpected outcome prompted over ten years of longitudinal study in school districts across the nation to te 6/1/2009

Learning Institute

The Detroit Institute of Arts, a City of Detroit-owned comprehensive art museum, is requesting support in the amount of $250,000 to establish a Learning Institute to offer specialized training for museum colleagues, educators and teaching artists. The interpretive strategies that guided the reinstallation of the DIA’s galleries have been recognized nationally as among the most innovative and stimulating methods for engaging non-expert visitors of all ages with art objects. In addition, the DIA is also a leader in integrating studio art-making experiences with more traditional museum or classroom teaching. Our learning, evaluation and interpretive specialists are being invited to participate on panels and to host entire sessions for colleagues at professional conferences throughout the coming year. The DIA’s education staff was asked to moderate a symposium on art museums and community to an international audience, however it had to decline even though a foundation was willing to fund more than half the costs due to lack of resources. The DIA is poised to become a venue for ongoing professional development for a nationwide audience. Building on that succes6/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

6/1/2010

$

150,000

6/1/2010

$

250,000

10/1/2010

$

7,000,000

N s

Detroit Institue of Arts Detroit

qu

d e tt

Detroit Institue of Arts Detroit

02262009

t i m

S

ub

t s e

Emergency Management Plan

e R

The Detroit Institute of Arts, a City of Detroit-owned comprehensive art museum, is requesting support in the amount of $7,000,000 for the implementation of the capital projects included in our master planning process with regard to fire protection and life safety. This planned project would fulfill the museum’s need for life safety and art collection protection in the event of any type of an emergency. The master plan identified the following needs: upgrading the fire detection and electrical systems, installation of a museum-wide Public Address System and the installation of an Emergency Generator. It is critical for the Detroit Institute of Arts to install a public address system to allow the DIA Executive Crisis Management Team to make public announcements during an emergency or catastrophic event. More than 600,000 adults and school children visit the museum annually. Currently, the only announcement option is for security guards to alert each person in the museum individually. An emergency generator is essential in the event of an electrical outage resulting from a power failure. The 2003 national blackout and subsequent local powe6/1/2009

Submitted Requests - Not Approved

219 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Detroit Midtown Academy

Detroit Public Library

Detroit Public Library

Detroit

Detroit

Detroit

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Detroit Midtown Academy

The project proposed, the DMA Student Laptop Loan Program, would require purchasing 50 laptop computers and internet cards, as well as acquiring instruction for the students and families in proper care and usage. Obtaining the laptops and internet cards would allow the students to have access to technology that they otherwise would be unable to acquire. This allows our educational community to address the issue of the Digital Divide with our families. Our population consists of a high percentage of at-risk and economically disadvantaged students (92%). Many children and families have virtually no access to the types of technologies that can already be found in many of our state’s wealthier schools and districts. Some students begin their enrollment at our school performing one or more grade levels below satisfactory in core academic subject area's). The technology described above would enhance and extend classroom instruction and the learning process in the core academic areas of English Language Arts/Reading, Mathematics, Science, and Socia Studies. This program also gives the students the opportunity to become technologica 3/1/2009

$

163,250

Mark Twain Branch Lease & build-out

Branch closed in 1997 due to structural issues; rehab too expensive. Partnering with the Gratiot Woods Dev. Initiative for new branch as part of a development initiative in that community. December, 2009 April, 2011

$

1,500,000

South Wing Renovations @ Main Library

Renovation of second floor South Wing of Main Library to provide increased access to collections, programming and technology in the Business, Science and Technology department. June, 2009

June, 2010

$

1,500,000

June, 2011

$

10,000,000

T O

P P A

O R

N s

5/1/2009

D VE

Detroit Public Library

Detroit

New Riverfront Branch Library to expand Elmwood Park Branch service area

A new 25,000 sq ft building is proposed to serve a growing eastside community. Currently, the closest library to the community is the Elmwood Park Branch, located in a leased storefront at Chene & E. Lafayette. July, 2009

Detroit Public Library

Detroit

HVAC @ Main Library

Total updating and replacing of the mechanical and electrical systems at Main Library July, 2009

June, 2011

$

13,700,000

Wilder Branch renovation

Located at 7140 E. 7 Mile Rd., the Wilder Branch serves an eastside neighborhood. Renovations will include HVAC, electric updates; expanded technology capacity and increased programming space. July, 2009

June, 2010

$

2,500,000

$

3,500,000

Detroit Public Library

Detroit

d e tt

Detroit Public Library

Detroit

Renovation & Expansion of Detroit Public Library's Children's Library @ Main Library

Detroit Public Library

Detroit

New Branch for 48217 area

Detroit Public Library

Detroit Public Library

Detroit Public Library

it

Detroit

Detroit

Detroit

02262009

bm

New Roof @ Main Library

u S

e u

st

q e R

Children's Library is located at Main Library, 5201 Woodward Avenue, located in the University Cultural Center. Plans call for the renovation and expansion of the existing Children's Library, resulting in a 13,000+ square foot space for serving Detroit's youth. Open & flexible programming space, increased interactive technology and improved access to library collections will be the of this project. The library plays a significant role in developing and nurturing literacy Detroit's children. This project will enhance Children's Library's ability to serve as modern center for literacy and lifelong learning for children and families. In 2001, DPL acquired a site in southwest Detroit to provide service to an underserved area. Currently, closest branch is at least 5 miles away. July, 2009

June, 2011

$

6,000,000

New roof for Main Library because current roof has exceeded lifespan, resulting in leaks & constant patching. Will also replace the deteriorating bricks and mortar around the lightwells, windows and parapet walls.

April, 2009

April, 2011

$

6,000,000

Proposing a new 20,000 sq ft branch to replacing two existing branches that are located within a two miles radius. The 7500 sq ft Chandler Park Branch has significant New branch library to replace Chandler Park & structural issues, including a shifting foundation. The 5000 sq ft Franklin Branch is landlocked and in need of expansion. July, 2009 Franklin branches

June, 2011

$

8,000,000

The Chase (17731 W 7 Mile Rd) & Hubbard (12929 W. McNichols) branches are located on the westside, in close proximity to each other. Plans call for a new 20,000 sq ft branch building that will include a teen center and a technology & business center. July, 2009

June, 2011

$

8,000,000

New branch to replace Chase & Hubbard Branches

Submitted Requests - Not Approved

Route (Infrastructure Only)

220 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Detroit Public Library

Detroit Repertory Theatre

Detroit Repertory Theatre Detroit Repertory Theatre

Detroit Science Center Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society

Project Name

Project Description

Start Date

Detroit

New branch to replace Knapp & Lincoln Branches

These eastside branches, Knapp (13330 Conant) & Lincoln (1221 E. 7 Mile Rd), are landlocked and without room for expansion to accommodate growing service needs. A new 20,00 sq ft library is proposed, which will include community meeting spaces, a teen center and a service emphasis for new Americans. July, 2009

Detroit

Detroit Repertory Theatre Energy Saving Project #1

The "greening" of building #1 (scene shop and rehearsal space). Insulate walls and ceiling. Replace all windows with glass block. Wall up sliding door portal and install standard metal door. Improve steam heat circulation and modify air exhaust system. 90 days

Detroit Repertory Theatre Energy Saving Porject #2

The "greening" of building #2 (costume shop & storage and print shop - & archival records). Replace and insulate roof. Install insulated ceilings. Make all external windows energy efficient. Modify interior structures to improve circulation & energy efficiency. Modify exhaust system.

Detroit Repertory Theatre Public Safety Project

Replace the crumbling and dangerous public sidewalk from corner of Buena Vista/Woodrow Wilson to Theatre parking lot entrance to make the Theatre entrance safe and user friendly.

Detroit

Detroit

Expected Completion Date

T O

June, 2011

D VE $

8,000,000

$

50,000

$

100,000

$

35,000

12/31/2009

$

3,345,000

9/1/2010

$

1,985,000

O R

P P A 90 days

Funding Request

60 days

60 days

Detroit

The Science Center is requesting a grant of $450,000 for building construction and modification to support two major, related projects, Going Green: Renewable Energy and Energy Efficiency Demonstration Project and Future Fuels Gallery, that focus on the important issues of energy and fuel technologies and the exciting new Detroit Science Center Energy Demonstration developments and careers in renewable energy technologies, energy efficiency and Projects alternative fuels (brief narrative attached). 4/1/2009 Expansion of Nature Trails and Interpretive Center for Nature Center serving 65,000 Belle Isle Nature Zoo Improvements urban visitors. 7/1/2009

Huntington Woods, MI

Animal Management Building

Structural renovation of animal care areas for animal welfare and USDA compliance

2/15/2009

5/1/2009

$

150,000

Huntington Woods, MI

Antelope Exhibit Renovation

2/15/2009

6/1/2009

$

200,000

Huntington Woods, MI

Arctic Ring of Life Improvements

Structural renovation of animal care areas for animal welfare and USDA compliance Improvements to life support systems, Seal exhibit, visitor areas, necessary for animal welfare and education programs

11/1/2008

9/1/2009

$

750,000

Huntington Woods, MI

Barnyard Renovations

Renovation of animal care and exhibit areas

5/1/2009

9/1/2009

$

100,000

Huntington Woods, MI

Wolverine Exhibit Renovation

Structural renovation of animal care areas for animal welfare and USDA compliance

5/1/2009

9/1/2009

$

225,000

Huntington Woods, MI

African Veldt Animal Holding

Structural renovation of animal care areas for animal welfare and USDA compliance

6/1/2009

12/1/2009

$

300,000

Huntington Woods, MI

Primate Holding at Tiger Building

Structural renovation of animal care areas for animal welfare and USDA compliance

7/1/2009

12/1/2009

$

100,000

Huntington Woods, MI

African Wild Dog Holding

Structural renovation of animal care areas for animal welfare and USDA compliance

7/1/2009

12/1/2009

$

100,000

Detroit

tt i m

d e t

ub

s t s

-N

e u

q e R

Huntington Woods, MI

Kangaroo / Wallaby Holding

Structural renovation of animal care areas for animal welfare and USDA compliance

7/1/2009

12/1/2009

$

100,000

Huntington Woods, MI

Guanaco Holding

Structural renovation of animal care areas for animal welfare and USDA compliance 7/1/2009 Structural renovation of animal care areas for animal welfare, USDA compliance, and education programs 7/1/2009

12/1/2009

$

150,000

3/1/2010

$

250,000

Structural renovation of animal care areas for animal welfare and USDA compliance

7/1/2009

3/1/2010

$

300,000

Improvement of animal care area of "center exhibit" at Holden Museum. 7/1/2009 Major renovation to interior animal care areas, and exterior improvements, for animal welfare and USDA compliance. MiOSHA fall protection upgrade. 7/1/2009 Major renovation to interior and exterior of this structure for animal welfare, USDA compliance, and educational programming 6/1/2009

3/1/2009

$

600,000

3/1/2010

$

750,000

3/1/2010

$

1,150,000

S

Huntington Woods, MI

Hippo Building Renovations

Huntington Woods, MI Huntington Woods, MI

Rhino Building Improvements Holden Museum of Reptiles - Animal Care Improvements

Huntington Woods, MI

Great Apes Facility Upgrades

Huntington Woods, MI

Lion / Primate Facility

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

221 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Project Name Detroit Zoological Royal Oak and Huntington Society Woods, MI Backup Power Supplies Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society Detroit Zoological Society

Project Description

Start Date

Expected Completion Date

Backup power supplies as part of all-hazards mitigation plan.

3/1/2009

7/1/2009

3/1/2009

9/1/2009

5/1/2009

10/1/2009

Royal Oak and Huntington Woods, MI Access Control Improvements Royal Oak and Huntington Woods, MI ADA / Sidewalk Improvements Royal Oak and Huntington Woods, MI Gunite Improvements Royal Oak and Huntington Woods, MI Emergency / Service Vehicle Ingress / Egress Royal Oak and Huntington Woods, MI IT Infrastructure

Major renovation of facility security system and access control as part of all-hazards mitigation plan. Biometric, key, lock, and gate control. Phase I of 2. Improvements to pathways, sidewalks, curbs, entrances to better accommodate all persons, as part of barrier-free design process. Phase 1.

Royal Oak, MI

National Amphibian Center - Boardwalk

Expansion of exterior wetlands trail from National Amphibian Conservation Center

Royal Oak, MI

Guest Services Building

Creation of secure cash handling area.

Green Jobs Training Program

DWEJ’s Green Jobs Training Program focuses on providing high-quality, certified training to underemployed and unemployed Detroit and SE Michigan residents in the burgeoning job sectors of energy efficiency/auditing; green housing construction/deconstruction; weatherization; retrofitting; and lead, asbestos, and mold remediation (brownfields remediation). This program has successfully placed 85% of its previous trainees, and has its roots in a well-established training program of the Deep South Center for Environmental Justice (New Orleans) at Dillard University, funded by the National Institute of Environmental Health Sciences. This program addresses the need for an efficient and effective short-term training program that will quickly develop well-trained workers drawn from underemployed workforce pools in Michigan, in order to fill the surging demand for workers able to pursue the jobs funded by the Obama administration’s new Economic Stimulus and Green Collar Jobs Funding Initiatives. In addition, our training program responds to the long-term demand for workers with the skills needed to address the remediation and redevelopm7/1/2009

Funding Request $

125,000

D VE $

100,000

$

300,000

$

500,000

$

300,000

3/1/2010

$

250,000

7/1/2009

12/1/2009

$

300,000

2/15/2009

3/15/2009

$

50,000

12/1/2010

$

1,300,000

The mission of DWEJ's Detroit Sustainability Center is to be the catalyst for a paradigm shift in approaches to sustainable development in Detroit and Southeast Michigan by providing an inspirational physical headquarters where collaboration, coordination, and training will help to develop a new urban infrastructure for healthy and environmentally efficient housing, green careers and businesses, and restoration of the urban environment through sustainable land redevelopment practices. 8/1/2009

6/1/2011

$

24,000,000

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area. The number one citizen concern in this plan is the lack of public water. The lack of water has helped and to the destabilized of this year. 6/1/2009

10/1/2010

$

3,500,000

Improvements to exterior exhibit structures for animal welfare and USDA compliance. 5/1/2009 Upgrades to emergency and service vehicle access areas, and to general parking areas. Includes Avian Influenza modifications. 7/1/2009 Improvements to data communications infrastructure to enhance life safety and access control systems 7/1/2009

T O

7/1/2010

P P A

O R 12/1/2009

Route (Infrastructure Only)

N s

t s e

Detroiters Working for Environmental Justice Detroit

Detroiters Working for Environmental Justice Detroit

DeWitt Charter Township

i m

ub

R d

e t tt

Detroit Sustainability Center

u q e

DeWitt Charter Township Expansion of Public Water in Southern Tier

S 02262009

Submitted Requests - Not Approved

222 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DeWitt Charter Township

DeWitt Charter Township

DeWitt Charter Township

DeWitt Charter Township

DeWitt Charter Township

DeWitt Charter Township

Project Name

Project Description

Start Date

DeWitt Charter Township Elimination of pump station 108

Station #108 is operated by DeWitt Charter Township. This 36 year old station constructed in 1972 is past its anticipated useful life. Located in close proximity to a heavily trafficked intersection, it is at risk for damage and failure from traffic accidents. Elimination of this pump station could redirect the sewage flow by gravity sewer through the adjacent Watertown Charter Township sewer. That change would eliminate the operating costs of the existing station, reduce energy usage by routing the sewage through a modern, efficient pump station and reduce the sewage flow into the 18” interceptor feeding station #501. This change would also increase the available capacity in the 18” south interceptor and reduce the risk of an SSO from it. 8/9/2009

DeWitt Charter Township Sewer Master Plan

DeWitt Charter Township sewer system is 30 years old in many areas. The system is aging and is in need of repairs. We have completed a collection system rehab plan, but have not evaluated the complete deficiencies in our system. We are in the need of reviewing our pump stations and developing a long term plan for upgrade and growth of the system. This plan would also help identify areas with high inflow and infiltration, allowing us to fix them and reduce costs for the Township and its customers. 3/9/2009

DeWitt Charter Township New Fire Station

DeWitt Charter Townships Fire Station One is in need of major repairs. A study is currently being done to determine if it is more cost effective to remodel the building or build a new one. The building needs many expensive repairs and is not energy efficient. Three HVAC units are used to heat the building. 10/9/2009

Wastewater Collection System Extension DeWitt Charter Township North Business 27 Corridor

d e tt

it

u S

bm

DeWitt Charter Township BR127 streetscape improvements

02262009

O R

D VE

250,000

10/9/2009

$

250,000

2010

$

1,500,000

The Business 27 corridor, north of the I-69 interchange, has experienced significant economic development over the past five years, the latest being the opening of the Meijer store in 2007. The extension of sanitary sewer north of the currently developed area has been anticipated for over eight years; 2003 study provided the basis for the sanitary sewer extension. The initial phase of the sanitary sewer extension includes the construction of 2,400 feet of sewer with the Business 27 corridor, opening approximately 60 acres of land to commercial development. 7/9/2009

12/9/2009

$

750,000

The Capital International Airport will be relocating the passenger terminal to an area a the intersection of DeWitt Road and State Road. In conjunction with the terminal relocation, approximately 100 acres of commercial and industrial property, adjacent to the new terminal is anticipated to be developed. The anticipated timeline for the airpor expansion is within the next five years. In order to serve the new terminal and commercial/industrial development, it will be necessary to upgrade the Township’s wastewater collection system. The estimated project cost for the collection system upgrade is $ $2,155,000. 7/1/2009

12/9/2009

$

2,155,000

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area for both commercial and residential. One way is to make streetscape improvements along BR127 and State Roads. This would include the addition of sidewalks to increase safety. 2010

2010

s t s

P P A

-N

e u

q e R

Submitted Requests - Not Approved

10/1/2010

Funding Request

$

T O

Waste Water Collection system DeWitt Charter Township capacity/reliability upgrade

Expected Completion Date

Route (Infrastructure Only)

223 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DeWitt Charter Township & Capital City Airport

Project Name

Project Description

Start Date

Expected Completion Date

DeWitt Charter Township Widening of State Road

The Capital International Airport will be relocating the passenger terminal to an area a the intersection of DeWitt Road and State Road. In conjunction with the terminal relocation, approximately 100 acres of commercial and industrial property, adjacent to the new terminal is anticipated to be developed. The anticipated timeline for the airpor expansion is within the next five years. In order to serve the new terminal and commercial/industrial development, it will be necessary to widen State Road to handle the additional traffic Load 2010

DeWitt Charter Township Upgrade pump station 501

Station #501 is jointly operated by DeWitt and Bath Charter Townships. This 31 year old station constructed in 1977 pumps an approximate daily average 1.61 MGD. 100% of Bath Township’s sewage (.6085 MGD) and approximately 83% of DeWitt Township’s sewage (1.0 MGD) are pumped by this station. The sewage is unmetered Two of the three pumps and each of ten valves are original and in need of reconditioning and /or replacement. Additionally, the original sewage pipe configuration results in a major interceptor (the 18” to the south) backing up during high flows due to inflow and infiltration and caused SSO’s in the past. 8/9/2009

D VE $

5,700,000

10/1/2010

$

200,000

DeWitt Charter Township Upgrade pump station 504

Station #504 is jointly operated by DeWitt and Bath Charter Townships. This 31 year old station constructed in 1977 pumps a daily average of 0.71 MGD. 100% of Bath Township’s sewage (.6085 MGD) and approximately 7% of DeWitt Township’s sewage (0.1 MGD) are pumped by this station. The sewage is unmetered and the two pumps are original. The station is located in the right of way, the wet well is severely damaged from Hydrogen Sulfide, and relocation is necessary due to the unavailability of space to repair the station in place. Upgrade of the station during relocation would eliminate the need to redirect the flow from station #118 (Meijer’s) as the area it services develops. 8/9/2009

10/1/2010

$

2,000,000

DeWitt Charter Township Bath Waste Water Interceptor Replacement

All of Bath Township wastewater runs cross country through DeWitt Township. This line that runs next to the a major Remy-chandler. Inspections of the line have found major areas of concern that must be addressed before they cause a problem. If this occurs it could causes all of Bath township wastewater to enter into this major drain system. An upgrade would also increase the size of the pipe, thus allowing for future growth in Bath Township. 8/9/2009

10/1/2010

$

3,500,000

To facilitate future development on the Airport extend water main to new freight building. This is a project critical to the Greater Lansing Region because it will allow the airport to open its port of entry and fair trade zone

8/9/2009

10/1/2010

$

650,000

DeWitt Charter Township and Capital City Airport DeWitt Charter Township Airport redirect Sanitary sewer lift station

To Facilitate future development on the Airport redirect Sanitary sewer lift station for new freight building. This is a project critical to the Greater Lansing Region because it will allow the airport to open its port of entry and fair trade zone 8/9/2009

10/1/2010

$

1,500,000

DeWitt Charter Township, East Lansing, and Lansing Township

Extension of Coleman Road between Wood Road and West Road

9/9/2009

$

4,000,000

10/10/2009

$

3,500,000

DeWitt Charter Township and Bath Charter Township

DeWitt Charter Township and Bath Charter Township

DeWitt Charter Township and Bath Charter Township

DeWitt Charter Township and Capital Water main extension for freight building City Airport DeWitt Charter Township development

DeWitt Township

itt

City and Township

d e t

S

m b u

Extension of Coleman Rd

DeWitt Charter Township, Clinton County Expansion of Public Water in Southern Tier

02262009

T O

q e R

N s

3/9/2009

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area. The number one citizen concern in this plan is the lack of public water. The lack of water has helped and to the destabilized of this year. 6/9/2009

Submitted Requests - Not Approved

O R

P P A

st

e u

2010

Funding Request

Route (Infrastructure Only)

224 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DeWitt Township

Project Name

Project Description

Start Date

Expected Completion Date

DeWitt Charter Township, Clinton County Upgrade pump station 501

Station #501 is jointly operated by DeWitt and Bath Charter Townships. This 31 year old station constructed in 1977 pumps an approximate daily average 1.61 MGD. 100% of Bath Township’s sewage (.6085 MGD) and approximately 83% of DeWitt Township’s sewage (1.0 MGD) are pumped by this station. The sewage is unmetered Two of the three pumps and each of ten valves are original and in need of reconditioning and /or replacement. Additionally, the original sewage pipe configuration results in a major interceptor (the 18” to the south) backing up during high flows due to inflow and infiltration and caused SSO’s in the past. 8/9/2009

DeWitt Charter Township, Clinton County Elimination of pump station 108

Station #108 is operated by DeWitt Charter Township. This 36 year old station constructed in 1972 is past its anticipated useful life. Located in close proximity to a heavily trafficked intersection, it is at risk for damage and failure from traffic accidents. Elimination of this pump station could redirect the sewage flow by gravity sewer through the adjacent Watertown Charter Township sewer. That change would eliminate the operating costs of the existing station, reduce energy usage by routing the sewage through a modern, efficient pump station and reduce the sewage flow into the 18” interceptor feeding station #501. This change would also increase the available capacity in the 18” south interceptor and reduce the risk of an SSO from it. 8/9/2009

O R

D VE $

200,000

10/10/2009

$

250,000

DeWitt Charter Township, Clinton County Upgrade pump station 504

Station #504 is jointly operated by DeWitt and Bath Charter Townships. This 31 year old station constructed in 1977 pumps a daily average of 0.71 MGD. 100% of Bath Township’s sewage (.6085 MGD) and approximately 7% of DeWitt Township’s sewage (0.1 MGD) are pumped by this station. The sewage is unmetered and the two pumps are original. The station is located in the right of way, the wet well is severely damaged from Hydrogen Sulfide, and relocation is necessary due to the unavailability of space to repair the station in place. Upgrade of the station during relocation would eliminate the need to redirect the flow from station #118 (Meijer’s) as the area it services develops. 8/9/2009

10/10/2009

$

2,000,000

DeWitt Township

DeWitt Charter Township, Water main extension for freight building Clinton County development

To facilitate future development on the Airport extend water main to new freight building. This is a project critical to the Greater Lansing Region because it will allow the airport to open its port of entry and fair trade zone

8/9/2009

10/10/2009

$

650,000

DeWitt Township

DeWitt Charter Township, Clinton County Airport redirect Sanitary sewer lift station

To Facilitate future development on the Airport redirect Sanitary sewer lift station for new freight building. This is a project critical to the Greater Lansing Region because it will allow the airport to open its port of entry and fair trade zone 8/9/2009

10/10/2009

$

1,500,000

All of Bath Township wastewater runs cross country through DeWitt Township. This line that runs next to the a major Remy-chandler. Inspections of the line have found major areas of concern that must be addressed before they cause a problem. If this occurs it could causes all of Bath township wastewater to enter into this major drain system. An upgrade would also increase the size of the pipe, thus allowing for future growth in Bath Township. 8/9/2009

10/10/2009

$

3,500,000

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area. With the recent creation of the Clinton County Brownfield authority the Township would like to take advantage of our ability to clean up some blighted area's in the Southern tier. This would greatly encourage redevelopment in this area. 4/9/2009

2010

$

675,000

DeWitt Township

T O

10/10/2009

Funding Request

Route (Infrastructure Only)

P P A

N s

DeWitt Township

itt

DeWitt Township

d e t

m b u

S DeWitt Township

DeWitt Charter Township, Clinton County Brownfield redevelopment in southern tier

02262009

qu

e R

DeWitt Charter Township, Clinton County Bath Waste Water Interceptor Replacement

t s e

Submitted Requests - Not Approved

225 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DeWitt Township

DeWitt Township

DeWitt Township

DeWitt Township

DeWitt Township

DeWitt Township

DeWitt Township

DeWitt Township Dexter Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

DeWitt Charter Township, Clinton County Sewer Master Plan

DeWitt Charter Township sewer system is 30 years old in many areas. The system is aging and is in need of repairs. We have completed a collection system rehab plan, but have not evaluated the complete deficiencies in our system. We are in the need of reviewing our pump stations and developing a long term plan for upgrade and growth of the system. This plan would also help identify areas with high inflow and infiltration, allowing us to fix them and reduce costs for the Township and its customers. 3/9/2009

DeWitt Charter Township, Clinton County Community Center window replacement

Over the last number of years the Township has put significant dollars into remodeling our community Center. The only project not completed was replacement of the energy inefficient windows. 4/9/2009

DeWitt Charter Township, Clinton County New Fire Station

DeWitt Charter Townships Fire Station One is in need of major repairs. A study is currently being done to determine if it is more cost effective to remodel the building or build a new one. The building needs many expensive repairs and is not energy efficient. Three HVAC units are used to heat the building. 10/9/2009

DeWitt Charter Township, Wastewater Collection System Extension Clinton County North Business 27 Corridor

The Business 27 corridor, north of the I-69 interchange, has experienced significant economic development over the past five years, the latest being the opening of the Meijer store in 2007. The extension of sanitary sewer north of the currently developed area has been anticipated for over eight years; 2003 study provided the basis for the sanitary sewer extension. The initial phase of the sanitary sewer extension includes the construction of 2,400 feet of sewer with the Business 27 corridor, opening approximately 60 acres of land to commercial development. 7/9/2009

DeWitt Charter Township, Waste Water Collection system Clinton County capacity/reliability upgrade

The Capital International Airport will be relocating the passenger terminal to an area a the intersection of DeWitt Road and State Road. In conjunction with the terminal relocation, approximately 100 acres of commercial and industrial property, adjacent to the new terminal is anticipated to be developed. The anticipated timeline for the airpor expansion is within the next five years. In order to serve the new terminal and commercial/industrial development, it will be necessary to upgrade the Township’s wastewater collection system. The estimated project cost for the collection system upgrade is $ $2,155,000. 7/9/2009

D VE $

250,000

$

40,000

2010

$

1,500,000

12/9/2009

$

750,000

12/9/2009

$

2,155,000

The Capital International Airport will be relocating the passenger terminal to an area a the intersection of DeWitt Road and State Road. In conjunction with the terminal relocation, approximately 100 acres of commercial and industrial property, adjacent to the new terminal is anticipated to be developed. The anticipated timeline for the airpor expansion is within the next five years. In order to serve the new terminal and commercial/industrial development, it will be necessary to widen State Road to handle the additional traffic Load 2010

2010

$

5,700,000

DeWitt Charter Township, Clinton County BR127 streetscape improvements

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area for both commercial and residential. One way is to make streetscape improvements along BR127 and State Roads. This would include the addition of sidewalks to increase safety. 2010

2010

DeWitt City and Township, Clinton County Extension of Coleman Rd

Extension of Coleman Road between Wood Road and West Road

3/9/2009

9/9/2009

$

4,000,000

Dexter Village

Remodel and Enlarge Community Education Office

7/1/2009

7/1/2010

$

37,500

02262009

Wylie Elementary

-N

eq

10/9/2009

R d

i m

b u S

s t s

O R

P P A

e u

e t tt

DeWitt Charter Township, Clinton County Widening of State Road

T O

10/9/2009

Funding Request

Route (Infrastructure Only)

Submitted Requests - Not Approved

226 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Dickinson County

Project Name

Project Description

replace existing doors

Discovery Arts and Technology Academy Inkster

boiler, ventitlation and piping

Discovery Arts and Technology Academy Inkster

renovate empty wing

Discovery Arts and Technology Academy Inkster

parking lot repair and re-surface

Discovery Arts and Technology Academy Inkster

d e tt

S

Duncan Township, Houghton County

12/10/2009

$

13,000

6/1/2009

9/1/2009

$

195,000

6/1/2009

9/1/2009

$

390,000

6/1/2009

9/1/2009

$

20,000

repair electrical system, HVAC, windows, and plumbing system

3/1/2009

5/31/2009

$

20,000

replacement roof

3/1/2009

7/1/2009

$

420,000

q e R

N s

st

Sidnaw Fire Hall & Township Offices

Construct a new voting precinct for Sidnaw, office space for Duncan Township, and needed improvements to the fire hall in Sidnaw. A new, ADA complinat, townshipowned voting facility is essential to permit Sidwaw voters to continue to vote in their community.

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

9/1/2009

Dreamers Building Acquisition

ub

Dramatic Action, Inc. (DBA Dramatic Action Marshall, MI (Calhoun Theatre Company) County)

P P A

Marshall has seen many major employers disappear over the past ten years and is in desperate need of new businesses and new ideas to promote its special brand of small-town charm. Aware that the Arts are an important component in jump-starting a stagnant economy and a major consideration for employers/employees moving to the area, Calhoun County has recently begun expanding its focus on this sector. Dramatic Action Theatre Company, incorporated in November 2005 and granted 501(c)(3) non-profit designation by the I.R.S. in July 2007, was founded by three experienced Michigan performers and is centered in Marshall. The theatre company exists to provide innovative, worthwhile, affordable and life-affirming professional productions, with a special emphasis on providing employment opportunities to Michigan artists. Major goals also include providing each patron with access to high- May 1, 2009 (or quality theatre, regardless of personal circumstance, and to positively impact the as soon as the community of Marshall; specifically, to assist in the revitalization of Marshall’s financing is downtown. The company’s immediate Project/Objective is to raise the funds for purch secured)

t i m

02262009

T O

O R

Funding Request

6/1/2009

e u

Discovery Arts and Technology Academy Inkster

Duncan Township

Start Date

The State of Michigan Remonumentation program has been a great asset to the State of Michigan Residents in our County of Dickinson. We invoice all of the local surveyors, the MDNR and the road commissions to ensure the county residents are receiving the maximum benefit for their dollars spent. Our county is very rural and many of our cadastral corners are being obliterated by logging operations. This program recovers and rehabilitates many of these corners before original evidence is lost forever. This program is allows many rural larger tracts to be surveyed at a reasonable cost. A typical forty survey prior to the remonumentation program would cost in the neighborhood of $5,000 to $7,000. If the remonumentation program had been performed on the owners Section in which the forty resides, the cost is in the neighborhood of $1,500 to $2,000 and there is no dispute on the corners as the exterior of the Section has been reviewed by the peer group and everyone is in agreement on the work performed, eliminating lawsuits and problems in the future. All 83 Michigan Counties State of Michigan Remonumentation Program The most positive aspect of this program is it puts surveyors throughout the State to w3/1/2009

Discovery Arts and Technology Academy Inkster

Expected Completion Date

November 1, 2009 (approximately six months after financing is secured) $

500,000 N/A

$

130,000 NA

227 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

restaurant re-opening

Assist in the re-opening of a local restaurant. Funds will be used for insulation, system upgrades, efficient appliances, and other actions required to bring the facility up to code. The resulting facility would be the only stand alone, non-bar family restaurant in Duncan Township.

Duncan Township Hall Restoration

Restoration and renovatin of a 102 year old community building, preservation of a remaining CCC camp building that served as a dining hall for german POW's in WWII and creation of energy efficient green public building.

Duncan Township

Duncan Township, Houghton County

Duncan Township

Duncan Township, Houghton County

East China Township

East China Charter Township, St. Clair County WWTP Upgrades

Replace rotating biological contactors and other plant equipment upgrades

7/1/2009

East China Township

East China Charter Township, St. Clair County Orchard Drive Water Main

Extension of water main to replace failing on-site wells

5/1/2009

East China Township

East China Charter Township, St. Clair County Sanitary Sewer Extension - Meisner Road

Extend sanitary sewer to replace failing septic systems.

Ypsilanti

Public Safety Facility

The project includes the renovation of the Hoyt Conference Center into the Public Safety Facility. This facility will allow the Department of Public Safety (DPS) to be able grow with each passing year; upgrade security features whenever new technology becomes available and sufficient for use at EMU; and will be a more visible entity on campus showing the campus community that EMU is dedicated to the safety and security of the University's students, faculty, staff, and visitors to campus. 1/29/2009

EMU Energy Savings Project

Renovation of existing dormitory and dining services areas throughout campus. Replace aging and inefficient building envelope systems such as window,door and roof systems. Installation of new highly energy efficient building systems and equipment, including heating and ventilation systems and associated controls, light fixtures and water fixtures. Potential energy savings are significant and initial assessment by Chevron engineers is complete.

Eastern Michigan University

Eastern Michigan University

Ypsilanti

Eastern Michigan University

t i m

ub

Ypsilanti

Autism Collaborative Center

O R

$

80,000 NA

$

120,000 NA

D VE

1,000,000

10/1/2009

$

350,000

6/1/2010

$

950,000

9/1/2009

$

3,900,000 n/a

2/2/2009

2/1/2010

$

33,960,000 n/a

The renovation and support for the Autism Collborative Center (ACC) at Eastern Michigan University which will address the critical shortage of special education teachers and related services personnel that work with students with autism in our public schools. The ACC will train university students in six professional disciplines to provide services identified under IDEA. These disciplines include special education teachers, speech and language therapists, psychologists, social workers, occupational therapists and music therapists. Programs such as early intervention, integrated preschool and kindergarten opportunities, community based instruction, pre vocational and vocational training as well as parent education will be offered through the ACC. All programs have been developed from evidence based best practices. University students will be trained in a multidisciplinary model while providing intervention services to students with autism. 6/1/2009

9/1/2009

$

350,000 n/a

t s e

A T

7/1/2009

O N

qu

e R

PP

6/1/2010

Funding Request

Route (Infrastructure Only)

$

s

d e tt

Expected Completion Date

S 02262009

Submitted Requests - Not Approved

228 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Eastern Michigan University

Eastern Michigan University

Eastern Michigan University

Eastern Michigan University

Ypsilanti

Ypsilanti

Ypsilanti

Project Name

Project Description

Start Date

Expected Completion Date

PhD Nursing Education Program

The growing nursing shortage in Michigan and the nation is compounded by a dearth of diversity within the nursing workforce. In order to achieve the goals of Healthy People 2010 creative solutions are necessary. This PhD program is an innovative approach to addressing both the nursing shortage and the lack of diversity in the nursing workforce. The program is a soundly crafted interdisciplinary collaboration between the faculty from the EMU School of Nursing and the College of Education, drawing on their years of experience working with minority and under represented populations. This collaboration synthesizes evidence-based teaching and learning skills of both faculty groups, to develop new strategies for recruiting, admitting, retaining, and graduating a new generation of nursing educators. These changes in nursing education are congruent with the Institute of Medicine recommendations for improved health care education and will result in a better, larger, and more diverse nursing workforce. This PhD program will be the premier model for nursing education in the future. Our new generation of PhD nur 8/1/2009

Science Complex - Strong Hall Renovation (Phase 2)

Renovation and Modernization of outdated facility, including replacing existing HVAC, plumbing and electical systems to improving energy efficiency and reduce existing operating costs. Providing educational and research facilities for Geology and Geography and the Physics and Astronomy departments, which will complete Eastern Michigan University's Science Complex project. All design to meet LEED Silver Criteria and in compliance with the Americans with Disabilities Act.

Science Complex - Mark Jefferson Renovation (Phase 1B)

Renovation and Modernization of an outdated and inefficient natural sciences facility, to promote collaboration of the primary natural sciences of Biology, Chemistry and Psychology. This renovation will enhance the University's ability to compete for NIH and NSF funding to conduct biomedical research. Project includes the installation of state-of-the-art HVAC and controls, plumbing and electrical systems to reduce existing operating costs. All design to meet LEED Silver Criteria and in compliance with the Americans with Disabilities Act. 9/10/2010

PP

O R

D VE $

1,700,000 n/a

$

38,000,000 n/a

11/26/2011

$

43,750,000 n/a

Addition to the Science Complex to house Interdisciplinary Natural Science Laboratories, Classrooms, and Faculty offices. This facility is to be used for the introduction of our students to a diverse array of techniques and technologies currently used by researchers, and to provide opportunities for students to pursue independent research projects. Project includes installation of new state-of-the-art HVAC and controls, plumbing and electrical systems for energy efficient operation of natural sciences research and teaching laboratories. Installation of a "green roof" system on the second floor. All design to meet LEEDS Silver certification. Best Management Practices will be used in accordance with the Michigan Department of Enviromental Quality. 12/22/2008

9/10/2010

$

46,250,000 n/a

Infrastructure improvements necessary to develop 400 Acre Alternative Energy Renaissance Zone (drinking water, electrical service, natural gas service, wastewater treatment, rail service & primary road Gaines Highway) – one tenant identified – detailed cost breakdown is available 3/31/2009

9/30/2010

$

44,821,120

A T

s

t s e

8/1/2009

Funding Request

Route (Infrastructure Only)

O N

u q e

R d

Ypsilanti

i m

e t tt

Science Complex Addition (Phase 1A)

Economic Development Corp. of Chippewa County Kinross Charter Township

ub

S 02262009

Submitted Requests - Not Approved

229 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Eco-Park/EWI, LLC Emmet Co. DPW

Detroit/Ecorse

Project Name

Scrap Tire Recycling Through Reverse Polymerization Technology

Emmet Co. DPW Emmet Co. DPW

Project Description

Start Date

Expected Completion Date

A new, environmentally-safe, scrap tire processing technology, the Reverse Polymerization (RP) Process, developed, patented and successfully tested in Canada creates significant supplies of synthetic bio-fuels (from rubber trees) and 2 recycled industrial commodities, steel and carbon black. EP/EWI has raised $5 Million of $7 Million needed to begin operation of the 1st model plant by Nov. 2009. It seeks $2 Million in state funds, creates 60 immediate jobs, and leads to building the first fullscale plants creating 140 jobs in Michigan (2010) and up to 600 jobs by 2011. It also helps build 2 new US industries centered in Michigan, one producing carbon black (the US now imports 2 Million Tons of it each year and the auto industry is a major user) and another manufacturing future RP Process Equipment. The TR900 pilot plant (handling 900 tires/day; 600,000/year) will be on leased property in an Eco-Industrial Park on the 20-acre/2 Million SF Russell Industrial Center in Detroit, near GM’s Poletown Plant. The first full scale TR6000 plant, with 80 more jobs, is currently planned for late-2010 on the Detroit River at Nicholson’s Marine Terminal – next to US6/1/2009 Building Orgamics Waste Diversion & Collection Infrastructure in Emmet Co

T O

P P A

O R 1/1/2010

Funding Request

Route (Infrastructure Only)

D VE $ $

2,000,000 454,000

$ $

900,000 4,572,926

Emmet County

Emmet County Road Commission Emmet County Facilities Energy Saving Measures

Building Recycling Collection Infrastructure in Emmet & Neighboring Counties Building Recycling Processing Infrastructure in Northen Michigan replace 80 year old, inefficient road commission garage with new energy efficient building to house trucks and other equipment. completing "green updates" to Emmet County facilities, including Airport, Bay Bluffs Medical Facility, courthouse, and road patrol

Emmet County

Emmet County

Emmet County Road Commission

Replace deteriorating metal/concrete bridge deck with timber deck and rails

5/9/2009

8/9/2009

$

Emmet County

Emmet County

Emmet County Road Commission

resurface West Conway Road from Clayton Road to Heydey Street.

5/9/2009

8/9/2009

$

Maple River Road 300,000 Bridge West Conway 390,000 Road

Emmet County

Emmet County

Emmet County Road Commission

resurface State Road (C-77) from Harbor Springs to Middle Road

5/9/2009

8/9/2009

$

400,000 County Road C-77

Emmet County

Emmet County

Emmet County Road Commission

resurface Mitchell Road (C-58) from Division Road to Maplewood Road

5/9/2009

8/9/2009

$

470,000 County Road C-58

Emmet County

Emmet County

Emmet County Road Commission

resurface Pleasantview Road (County Road C-81) from M-119 to Nubs Nob Road

5/9/2009

8/9/2009

$

604,000 County Road C-81

Project Build upon Emmet County’s success in Commercial Curbside Recycling by expanding it to include cardboard collection to greatly increase diversion from the waste stream. Background Emmet County provides weekly curbside collection of recyclables (excluding cardboard) for over 200 businesses within the county. Most of these businesses and many others have requested cardboard collection for recycling due to no service or inadequate service from their private solid waste hauler. Cardboard can account for 70% of business waste. A Cardboard Commercial Collection Program was outlined in the Emmet County DPW.’s 2005 Business Plan slated for 2008 implementation. Emmet County Recycling just received the Petoskey Regional Chamber of Commerce’s Mission Award, for helping area businesses succeed. This project would utilize Michigan industries in the construction of alternative fuel collection trucks, divert cardboard from disposal in landfills where it breaks down into methane, a potent greenhouse gas, and process it in Emmet County's Recycle Facility, providing jobs for processors, and then shipping it to Michig 2/9/2009

8/9/2009

$

900,000

Emmet County

Emmet County

Emmet County

d e tt

t i m

Emmet County

Harbor Springs, Little Traverse Township (facility), service area to include Petoskey, Harbor Springs, all Emmet County up to Mackinaw Building Commercial Recycling Collection City, with potential expansion into Cheboygan Infrastructure in Emmet & Neighboring and Charlevoix Counties Counties

02262009

b u S

s t s

-N

e u

q e R

Submitted Requests - Not Approved

4/9/2009

11/9/2009

TBD

$ $

500,000 Levering Garage 1,115,091

230 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Emmet County

Harbor Springs/Little Traverse Township

Emmet County Recycling Facility

Emmet County

Pellston, Emmet County

Pellston Regional Airport Improvements

Emmet County plans to expand its Recycle Facility to quadruple its capacity from 7,500 to 30,000 tons per year to provide processing for curbside, commercial and drop-off recycling collections in Emmet and surrounding counties.This proven facility is well-poised to expand processing with design and engineering well underway. Designed for dual-stream processing, it will have the ability to upgrade to a single stream facility in the future if warranted. This 20,000 sq. ft. facility expansion will build on an already successful recycling program, where over 30 items are accepted for recycling, and recyclables are currently received from six neighboring counties. Emmet County's model program ensures incentives for maximizing recycling, transparency, accountability and cost-effectiveness, including cost-sharing to counties when markets allow. Recycling provides one of the lowest cost options for greenhouse gas reduction and results in a high job-to-investment ratio compared to other industries. The only publicly owned and operated facility north of Mt. Pleasant in the lower peninsula, this expanded facility could serve the entire region's recycling nee5/9/2009 construction of a new aircraft rescue and fire fighting/snow removal equipment building.

Building Organics Waste Diversion & Collection Infrastructure in Emmet County

Project Build upon Emmet County’s success in Residential & Commercial Curbside Recycling by expanding curbside collection to include source separated organics and yard waste. Background Emmet County DPW is an 18-year old thriving resource recovery program. We operate a model cost-effective, self-funded facility that offers comprehensive recycling, including drop-off, collection, and processing, as well as composting, hazardous waste and solid waste transfer services. Our next opportunity to maximize waste diversion is the development of a countywide food waste collection and composting program. EPA estimates that food waste makes up roughly 10.4% of the solid waste stream by composition. When buried in a landfill, food waste, grass clippings and paper boxes decompose anaerobically and in the process become the number one source of human-caused methane and a major player in climate change. This expansion will not only helps us reach our diversion goal of 40% but will provide Emmet County residents with something that they can do everyday to reduce global warming. Cool 2012 website explains, “Since there is only 5/9/2009

T O

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE

4/10/2009

$

4,572,926

$

11,500,000

5/10/2009

$

454,000

August, 2009

$

900,000

N s

Emmet County

Petoskey & Harbor Springs. Resort, Little Traverse & Bear Creek Townships

t s e

u q e

R d

Emmet County Department of Public Works

i m

e t tt

Harbor Springs, Little Traverse Township (facility), service area to include Petoskey, Harbor Springs, all Emmet County up to Mackinaw Building Commercial Recycling Collection City, with potential expansion into Cheboygan Infrastructure in Emmet & Neighboring and Charlevoix Counties Counties

02262009

b u S

Project Build upon Emmet County’s success in Commercial Curbside Recycling by expanding it to include cardboard collection to greatly increase diversion from the waste stream. Background Emmet County provides weekly curbside collection of recyclables (excluding cardboard) for over 200 businesses within the county. Most of these businesses and many others have requested cardboard collection for recycling due to no service or inadequate service from their private solid waste hauler. Cardboard can account for 70% of business waste. A Cardboard Commercial Collection Program was outlined in the Emmet County DPW.’s 2005 Business Plan slated for 2008 implementation. Emmet County Recycling just received the Petoskey Regional Chamber of Commerce’s Mission Award, for helping area businesses succeed. This project would utilize Michigan industries in the construction of alternative fuel collection trucks, divert cardboard from disposal in landfills where it breaks down into methane, a potent greenhouse gas, and process it in Emmet County's Recycle Facility, providing jobs for processors, and then shipping it to Michig February, 2009

Submitted Requests - Not Approved

231 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Emmet County Department of Public Works

Harbor Springs/ Little Traverse Township

Project Name

Project Description

Start Date

Recycle Facility Expansion

The Emmet County Dept. of Publis Works plans to expand its Recycle Facility to quadruple its capacity from 7,500 to 30,000 tons per year to provide processing for curbside, commercial and drop-off recycling collections in Emmet and surrounding counties.This proven facility is well-poised to expand processing with design and engineering well underway. Designed for dual-stream processing, it will have the ability to upgrade to a single stream facility in the future if warranted. This 20,000 sq. ft. facility expansion will build on an already successful recycling program, where over 30 items are accepted for recycling, and recyclables are currently received from six neighboring counties. Emmet County's model program ensures incentives for maximizing recycling, transparency, accountability and cost-effectiveness, including cost-sharing to counties when markets allow. Recycling provides one of the lowest cost options for greenhouse gas reduction and results in a high job-to-investment ratio compared to other industries. The only publicly owned and operated facility north of Mt. Pleasant in the lower peninsula, this expanded facility could serve the entire regionMay, 2009

Building Organics Waste Diversion & Collection Infrastructure in Emmet County

Project Build upon Emmet County’s success in Residential & Commercial Curbside Recycling by expanding curbside collection to include source separated organics and yard waste. Background Emmet County DPW is an 18-year old thriving resource recovery program. We operate a model cost-effective, self-funded facility that offers comprehensive recycling, including drop-off, collection, and processing, as well as composting, hazardous waste and solid waste transfer services. Our next opportunity to maximize waste diversion is the development of a countywide food waste collection and composting program. EPA estimates that food waste makes up roughly 10.4% of the solid waste stream by composition. When buried in a landfill, food waste, grass clippings and paper boxes decompose anaerobically and in the process become the number one source of human-caused methane and a major player in climate change. This expansion will not only helps us reach our diversion goal of 40% but will provide Emmet County residents with something that they can do everyday to reduce global warming. Cool 2012 website explains, “Since there is only 5/1/2009

T O

Emmet County Department of Public Works & Emmet County Recycling

Ensley Township

Petoskey & Harbor Springs. Resort, Little Traverse & Bear Creek Townships

Ensley Township, Newaygo County

u S

Ensley Township

Ensley Township, Newaygo County

02262009

Expected Completion Date

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

April, 2010

$

4,572,926

5/1/2010

$

454,000

N s

t s e

qu

e R

Ensley Township has 15 miles of remaining unpaved roads. Ensley Township through funding and mill age originally followed a program to improve and pave on mile per township quarter each year. Gradually the paved roads required upkeep and the repair and resealing costs upset the original plan. Currently 1.8 miles of Cottonwood, and 1 mile of Elm are already site prepared and await paving. Elm will require gravel repair because it has deteriorated in the period between site preparation and paving. This final mile of Elm will provide a direct route from M-82 into Kent County. Cottonwood provides route between 104th and 120th, two major roads in the township. 4/15/2009

9/30/2009

$

Cottonwood Ave. 1.8 Miles, Elm Ave, 145,000 1 Mile

Baptist Lake Park is located on the north side of Baptist Lake and includes Boat launch and parking, beach area, 20 X30 covered picnic pavilion, base ball diamond and green area. The Park does not have permanent restroom, bathhouse facilities, or water and the picnic pavilion is inadequate to meet public demand. The project proposes to build a closed facility to include well, septic, restroom and bathhouse facilities and a larger picnic facility. The perm ant facility would be ecofriendly and reduce the cost of renting Port-a-Johns in favor of hiring locally for supervisory and Ensley Township, Baptist Lake Park and Boat eminence. The facility would meet extended community needs and extended user Ramp Facilities needs from the boat launch facility. 4/15/2009

8/15/2009

$

Baptist Lake, 120th 50,000 Street

it

d e tt

Road Development and Sealing

bm

Submitted Requests - Not Approved

232 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Ensley Township

Ensley Township, Newaygo County

Project Name

Project Description

Ensley Nature Preserve

Ensley Nature Preserve is comprised of forty acres of woods, and wetlands gifted by the Michigan Department of Natural Resources to Ensley Township to develop for community use and education. The goal is to link use of forest and wetlands with a new Ensley Township hall to provide safe parking at trail heads, adequate restroom facilities, and use of community rooms for local, school, environmental, and recreation groups. The goal of trail development is to provide a close-up educational experience with handicap access to unique and protected species, a safe environment for community use, and a link with trails criss-crossing Michigan. Community involvment would be maximized by local groups working through the Ensley Nature Preserve Committee, helping with trail development and maintainence, individual sponsorship o trail materials, rest benches, picnic pavilions, bridges, and walk ramps. The Ensley Nature Preserve Committee's 2009 goal is to complete the parking facilities, design and develop the perimeter trail, identify endangered species, schedule the state forester to identify trees in jepoardy, map the bog area, map out future trails, identify a 3/30/2009

Ensley Township

Eric Fox (private commercial party)

PP

D VE $

136th and Cypress 65,000 Ave.

Ensley Township Hall

New Ensley Township Hall to reflect the changes in area growth by meeting community and administrative needs. The building now in use is a one room school house built in 1912. Structural deterioration, lack of insulation, inadequate restroom facilities, and the interior are no longer conducive to; fiscal responsibility, safety of staff, providing identity secure administrative services, provide voting facilities, or meet requested community use needs. Ensley Township, primarily a farming community also serves as bedroom and playground community to cities of Grand Rapids, Big Rapid, and Muskegon. Growth within Ensley Township has been steady until 2004, close proximity to 131 Expressway and larger cities make the township a popular recreation area for the lakes, a golf course, and hunting. In order to meet the current needs, as well as provide for future growth, the new town hall will be located on forty acres of forest land located at 136th and Cypress. The forty acre property donated by the Michigan Department of Natural Resources includes plans to link the town hall to the Ensley Nature Center at the rear of the property for trails, hiking, educ 4/15/2009

10/30/2010

$

136th and Cypress 350,000 Ave

Caro Hydro-Electric Dam Recommissioning

Feasibility study for the recommissioning of the existing hydro-electric dam to provide green, eco-friendly energy in an efficient manner. Preliminary calculations indicate thi existing dam, which was originally a hydroelectric dam, could produce 2 million kilowatt hours per year. This project could be turned around quickly to provide clean, renewable energy to the public power entities. 6/26/2009

11/20/2009

$

Left blank 100,000 intentionally

A T

t s e

O N

u q e

R d

City of Caro

O R

Funding Request

e t tt

i m

Erik Wilson, City Manager, 141 N. Main St., Plainwell, MI Plainwell, Michigan 49080 Plainwell Mill Redevelopment

Due to the completion of the For over one hundred years, the Plainwell Paper Mill had been a significant contributo existing conditions to Plainwell’s economy, culture and history. In November of 2000, the Plainwell Pape analysis, master Mill announced it would be shutting down operations. At one point, the mill consisted plan development of 500 employees and 18% of the City’s taxable value. When it become apparent that and concept design the project no developer would step forward without the City’s involvement the community could be ready to decided to purchase the 36 acre Superfund site in 2006. Plainwell is a low to start construction moderate income community of about 4,000 but has invested over $1,000,000 into by June 2009 ^June 2011 redevelopment efforts.

$

EUPISD

Our Rudyard Center program provides classroom space for severely disable students from eight of our constituent districts. We are in need of additional classrooms at this center. This project would build two additional classrooms up to LEED gold level certification and provide collaboration and consolidation of services at a greater level across our region. 7/1/2009

$

b u S

Rudyard, Michigan

02262009

Route (Infrastructure Only)

10/30/2009

s

Ensley Township, Newaygo County

Start Date

Expected Completion Date

Special Education Center Expansion

Submitted Requests - Not Approved

9/1/2010

7,510,250 NA

360,000

233 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Every Woman's Place, Inc. and Webster House Youth Services Muskegon

Exeter Township

Project Name

Project Description

Shelter and Service Expansion Project

Exeter Township, Monroe Exeter Township Water Main Construction Township District #4

Start Date

Expected Completion Date

The proposed project will build an addition to and remodel existing structures to address increased client demand for services, eliminate denial of service due to existing facility capacity/infrastructure failures, enable the agency to serve the additional catchment area requested of the agency by the State of Michigan, and allow 50 TANF-eligible current clients the opportunity to be mentored by 50 professional tradesmen while earning a stipend on the jobsite, gain skills, complete academic credentialing, and become certified in a trade that is projected to offer high future employability. It is anticipated that this dual-track attention to both addressing employment concerns of existing workers and providing specialized construction and non-construction related vocational and academic opportunities will result in the removal of 50 current TANF recipients from the rolls and into a variety of vocational opportunities that match their interests and skill sets. The proposed project will increase the square footage from 17,000 to 40,000 square feet, more than doubling the number of available beds, provide for private counseling offices, enhance security April, 2009

P P A

O R

Funding Request

D VE

November, 2010

$

Construction of approx. 148,497 linel feet of water mains to serve Exeter Township residents with contaiminated wells. Water will be provided from City of Monroe thru a joint operating agreement. May, 2009

Aug. 2010

$

Project: To build a 22 unit Hospitality House providing veteran/family-centered lodging for patients of Alpena Regional Medical Center, a federally-designated, rural regional referral center for all of Northeast Michigan. As hospitals address cost containment, more procedures are performed on an out-patient basis, often including same-day surgical care. On-going treatments, like radiation or chemotherapy, may not require overnight hospitalization, but usually involve a series of exhausting treatments for patients, especially if daily-round trips to the hospital are required. Even when medical treatment is covered by insurance, living expenses are not. Families cannot afford expensive motels. To reduce healthcare costs, Alpena’s Hospitality House will offer inexpensive accommodations during hospitalizations, before and after surgery, and during repeated visits. Alpena’s Hospitality House becomes a family’s home away from home. Jobs: Building “green” means that “green” experts and other construction jobs will be employed to build the house. Once built, the house will employ new administrative, clerical, maintenance, housekee9/1/2009

T O

Route (Infrastructure Only)

7,000,000

10,273,127 NA

N s

Faith & Hope Hospitality House

Farwell Area Schools

Farwell Area Schools

u q e

Alpena, MI

Alpena Hospitality House for Patients & Veterans

9/1/2011

$

4,000,000

The village of Farwell, Surrey township

NINTH PRIORT PROJECT The administration building is a structure over 100 years old. It is structurally sound but not energy efficient. This The Administration building needs renovated project would modernize the energy conservation design of the building using green to become energy efficient disign 6/1/2009

11/1/2009

$

25,000

SIXTH PRIORITY PROJECT Our current location of our District transportation center and bus garage is just shy of 400 yards from the nearest natural gas pipeline. This project would extend the pipeline thereby allowing our facility to access natural gas to heat our building. The building is in need of additional insulation Access Natural gas line and improve to conserve energy. The project would enable us to save significant public money on insulation to improve heating efficiency of our heating and burn a fuel that is more efficient and cleaner for the environment. This transportation center project is a green initiative. 5/1/2009

8/1/2009

$

30,000

EIGHTH PRIORITY PROJECT The district completed a bond project in 2008 that retrofitted much of our lighting throughout the district to become energy efficient. Unfortunately we fell short of 100% retrofit due to lack of funding. To completely finish the retrofit started with the bond project, 16 classrooms and two multipurpose rooms are in need of more energy efficient lighting. Our specifications are the most energy efficient on the market today 6/1/2009

8/1/2009

$

45,000

R d

The village of Farwell, Surrey township

02262009

e t tt

i m

ub

The village of Farwell, Surrey township

S Farwell Area Schools

t s e

Lighting Retrofit

Submitted Requests - Not Approved

234 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Farwell Area Schools

Farwell Area Schools

Farwell Area Schools

Farwell Area Schools

Project Name

Project Description

Start Date

Farwell Elementary School Energy and Security Renovation

FIRST PRIORITY PROJECT Replace exterior doors and windows with energy efficient models. Many doors and window were original installation prior to 1964. Current doors present a security and safety problem as energy waste. A local bond project has recently upgraded the other school buildings. There was not enough funding to upgrade the elementary building. 6/1/2009

The village of Farwell, Surrey township

Re-roof and additional insulation

FOURTH PRIORITY PROJECT There are two sections of District roofs that are still in need of repair. Nearly all of the districts roofs were upgraded three years ago through a local bond project, unfortunately these two areas were not completed with bond funds. A section of the elementary building and a small section on the high school needs improved isulation and new roofing. 6/1/2009

The village of Farwell, Surrey township

SEVENTH PRIORITY PROJECT Remodel existing shop area into a state of the art vocationally certified complex. The existing area was originally built in 1949 and is need of significant repair and upgrade. The need for vocational training for our students is crutial and this project would be completed in cooperation with ClareGladwin RESD and their vocational training plan. CGRESD is currently renting Automotive, small engines prevocational and temporary housing for the vocational automotive program. The remodeled site would vocational classroom and shop area enable our students to earn the needed skills to be cetified and ready for the job renovation market. 6/1/2009

The village of Farwell, Surrey township

FIFTH PRIORITY PROJECT The district upgraded approximately 20% of its monitoring and control of the heating, ventilation and cooling systems in a bond project recently completed. To become more efficient and save energy in our daily operation the district needs to finish the upgrade to include 100% o our facilities. The vendor has not been selected however, all potential vendors are designing state of the art green technologies into this project. 6/1/2009

The village of Farwell, Surrey township

9/1/2009

Funding Request

D VE $

225,000

11/1/2009

$

350,000

12/1/2009

$

400,000

12/1/2009

$

420,000

THIRD PRIORITY PROJECT The school district is in need of a multipurpose room that has a main function as an area for elementary tumbling and body awareness, middle and high school gymnastics, wrestling and aerobics and adul wellness and aerobics. This area would have access daily for all of our students K-12 and the community to promote wellness and an overall healthier lifestyle. The addition or building would be 7,200 square feet. We currently rent space for our wrestling team, the cheer team practices in the hallway and we have no facility for our younger students to be exposed to tumbling and gymnastic activities. Design uses green technology and is being designed by a firm certified in green design 6/1/2009

12/1/2009

$

540,000

SECOND PRIORITY PROJECT Currently we rent a portion of a service groups building in the village of Farwell to house our Alternative education program. The Program currently has 54 students enrolled. Our enrollment has increased to this number and remained static over the last few years inspite of many program improvements. The current site stifles our growth and quality of programs due to space, lack of educational design and poor technology and internet connectivity. To provide quality instruction to the standards needed for all students to be successful a new structure is needed. The new building would include a technology center, science facility, life skills room, multipurpose room and one conventional classroom. The new facility would be equipped with state of the art claimate comtrol, technology, internet connectivity and science equipment. Design uses green technology and is designed by a firm certified in green architecture. 9/1/2009

8/1/2010

$

620,000

T O

automated regulation of heating ventilation and cooling

Expected Completion Date

P P A

O R

N s

t s e

Route (Infrastructure Only)

u q e

Farwell Area Schools

The village of Farwell, Surrey township

The village of Farwell, Surrey township

02262009

e t tt

Multi-purpose room addition

i m

b u S Farwell Area Schools

R d

Design and Build State of the art Alternative Education Building

Submitted Requests - Not Approved

235 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ferndale

City of Ferndale

Ferndale

Ferndale

Project Name

Project Description

Start Date

Streetlight Conversion to LED

The City of Ferndale owns 255 street lights consisting of sodium and metal halide lighting throughout several developed corridors in the City. Conversion / retrofit of these light fixtures to light emitting diode (LED) would reduce energy consumption by approximately 75%.This project would retrofit 255 street lights to LED lighting and reduce energy consumption and cost. 2009

Water System Hydraulic Improvements

The City’s main water distribution system was constructed in the 1920’s, generally with 6” unlined cast iron pipe with universal joints which are prone to failure. The water main is considered in poor condition with significant tuberculation within the pipeline. Frequent water main breaks significantly reduce the reliability of the water system, pressures, and fire protection. Water quality would be increased with this project.The project would consist of replacing 2.1 miles (2.5 %) of the water main distribution system to increase the hydraulics and reliability of the water distribution system.

2009

Ferndale

43rd District Court

2010

Funding Request

D VE $

382,000

2010

$

1,980,000

The existing 43rd District Court is currently located in a 6,000 sft building which was converted years ago from a former mattress outlet store. The existing building is classified in poor condition and requires constant maintenance. The existing court house is located across from the Police Department which requires frequent crossing of a busy 4 lane road by Police Officers. The City of Ferndale has approved the construction of a new 12,000 sft facility which will be located adjacent to the City’s Police Station on City owned property.The project would consist of the construction of a new 12,000 sft District Court adjacent and connected to the City’s Police Station. 2010

2011

$

3,500,000

The City has recently completed a sewer analysis of approximately 38 miles of existing combined sewers. The assessment of this project has concluded that structural improvements are required in order to maintain the integrity and functionality of the sewer system.The sewer system was originally installed in the 1920’s and 30’s and located both in the road right-of-way and in rear yard easements. The existing clay pipes were installed with 2 – 3’ joint sections which were constructed with open joints. Existing concrete pipe has deteriorated and consists of longitudinal and radial cracks. Significant deterioration has occurred due to root intrusions, mineral deposits, and the general age of the system.This project would line 34,000 lft (7.7%) of existing combined sewers utilizing trenchless technology. 2009

2010

$

2,620,000

The existing Police Station was constructed in the 1960’s and is considered obsolete due to current size constraints and requirements. All files are currently stored off-site due to size constraints. Currently in the planning and preliminary design phase is the relocation of the 43rd District Court building. District Court is to be relocated adjacent to and connected with the Police Station. This project would consist of updating and renovating the existing Police Station to current architectural design standards for standard police activities and protocols. 2010

2011

$

1,942,000

T O

City of Ferndale

Expected Completion Date

O R

P P A

N s

t s e

Route (Infrastructure Only)

u q e

City of Ferndale

City of Ferndale

Ferndale

Ferndale

02262009

i m

S

ub

R d

e t tt

CIPP Structural Improvements

Police Station Renovations

Submitted Requests - Not Approved

236 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ferndale

City of Ferndale

City of Ferndale

City of Ferndale

Ferndale

Ferndale

Ferndale

Ferndale

Project Description

Start Date

Eight Mile Water Main Replacement

The Eight Mile Water Main was installed between 1933 and 1935 when Eight Mile was a 2 lane road. Currently, Eight Mile is an eight lane boulevard. The existing 8” and 12” water main is located under eastbound traffic lanes and in some potions, the wate main is outside of the City’s jurisdiction. The water main is considered in poor condition with significant tuberculation within the pipeline. Frequent water main breaks significantly reduce the reliability of the water system, pressures, and fire protection. Water main repairs generally cause significant traffic delays due to the traffic volume and location of the water main.Over 9 water main breaks have been identified on this segment.The project would consist of replacing 2.1 miles (2.5 %) of the water main distribution system to increase the hydraulics and reliability of the water distribution system. Water quality would be increased with this project. The water main would be relocated to the north in existing right-of-way. 2010

ADA Ramp Improvements

Sidewalk ramps within the City road right-of-way require upgrades to current ADA design guidelines.This project would replace non-compliant curb ramps throughout 500 City intersections to increase the walk-ability of the community and disabled.

City hall Renovations

City Hall was constructed in the 1960’s and is in need of updating and renovation. With the proposed 43rd District Court constructed adjacent to City Hall, renovations could be made for all departments and activities performed by the City. All departments would be housed under one roof with sufficient space and technology upgrades consistent with the current requirements of municipal governments. This project would consist of updating and renovating the existing City Hall to current standards.

Dept of Public Works Facility

2,184,000

2009

2011

$

2,250,000

2010

2011

$

2,282,000

The Department of Public Works facility was constructed in the 1940’s and has consisted of minor additions and upgrades over the years. Currently, the DPW has four separate buildings and a fuel area. The DPW is responsible to maintain infrastructure, parks, buildings, snow removal, tree trimming. DPW personnel are on the front-line of the federal homeland security.This project would consist of reconstructing the Department of Public Works facility to current design standards and homeland security requirements. 2010

2011

$

13,526,000

Replacment of the existing inefficient heating and cooling system (natural gas fired/air cooled condensing rooftop unit and boiler) with a super efficient, sustainable, geothermal heating and cooling system. Includes: cutting edge geothermal heating and cooling system for a 19,500 sf public library; 8 geothermal heat pumps, two energy recovery ventilators, one water to water heat pump and associated controls, ductwork, diffusers, radiant heating equipment and the closed loop geothermal vertica well field. The project is targeted to be LEED Certified. Funding of the geothermal system would allow the project to meet the LEED Silver Certification level. Architect: Penchansky Whisler Architects, Ann Arbor, MI Construction Manager: Frank Rewold & Son, Rochester Hills, MI 3/1/2009

3/1/2010

$

450,000

Summer 2009

Spring 2010

$

3,260,000

Summer 2009

Spring 2010

$

3,260,000 NA

6/1/2009

8/1/2009

$

s

t s e

O N

u q e

R d

Ferndale Public Library Geothermal Heating and Cooling System

Fillmore Township, Filmore Township Allegan County Flat River Community Players Greenville, MI 48838

02262009

D VE $

30,000 l.f. of 8", 12" and 16" water main serving commercial/light industrial areas Fillmore Township Allegan Fillmore Township, Allegan County, Michigan, along Blue Star Highway and 143nd Avneue. Also serving residential areas along County, Michigan Water main SAD's 4, 5 and 6 142nd Avenue, 143rd Avenue and 56th Street.

S

PP

O R

Funding Request

Route (Infrastructure Only)

2010

A T

e t tt

i m

ub

Ferndale Public Library Ferndale, Michigan

Fillmore Township

Project Name

Expected Completion Date

30,000 l.f. of 8", 12" and 16" water main serving commercial/light industrial areas Fillmore Township, Allegan County water main along Blue Star Highway and 143rd Avenue. Also serving residential areas along SAD's 4,5 and 6 142nd Avenue, 143rd Avenue and 56th Street. 40' x 100' Pole Barn: Headquarters, Storage and Construction facility for Flat River Community Players

Submitted Requests - Not Approved

60,000

237 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

FLEXSYS WIND ENERGY, LLC

Project Name

Project Description

Expected Completion Date

Start Date

FlexSys Wind Energy LLC (FlexSys) is requesting funding to test and manufacture its high value, adaptive, trailing edge wind turbine blade components in Michigan. These Ann Arbor, Michigan patented Flexsys designs have been extensively examined by internationally (engineering); Holland, recognized experts in wind turbine blade technology at Sandia National Laboratories. Michigan (Prototype Sandia’s experts concluded FlexSys’ technology offers 15% increase in energy development and initial capture combined with 75% reduction in blade fatigue over current technology. In their review, Sandia experts also noted use of FlexSys components will allow many manufacturing with cascading benefits of load alleviation such as cost savings due to simpler design and possible long term construction of the blade, tower, gearbox and the pitching mechanism. Sandia further manufacturing); Mackinaw identified the possibility of gains in energy capture beyond 15%. In short, Sandia’s City, Michigan (Prototype experts have determined FlexSys’ proprietary technology is transformational for wind testing); and possible energy production: one that will dramatically increase efficiency while significantly additional Michigan Demonstrate and Manufacture Proprietary, location for manufacturing High Efficiency "Adaptive Edge" Components reducing costs. To bring this transformational technology to market, FlexSys is requesting funding to build and test full-scale, prototype turbine blades in the first 12 toMarch 01 2009 scale up for Next Generation Wind Turbine Blades

O R

T O

P P A

K-12 School Modernization, Renovation and Repair: The Flint Community School District has not had a new school built since 1972. Declining enrollment and a weak local and state economy have greatly impacted operating revenues. The district has not been able to afford preventive maintenance and has made building repairs on an emergency basis only. Because of the preceding conditions, many improvements and upgrades are needed for our grounds and facilities. Due to enrollment losses, currently the district is "right-sizing" itself from 35 buildings to 18-20 buildings. The district has just completed a year long study of its facilities complete with an evaluation of all sites by an engineering and architectural firm. Site deficiencies were identified and repair/renovation costs have been established. Our remaining facilities would be greatly improved by the renovation and repair of sidewalks, parking lots and lighting. These improvements would also ensure safe access to our buildings for students, parents and busses. The estimated costs of these repairs and renovations is $4,400,580.00. 6/1/2009

Funding Request

Route (Infrastructure Only)

D VE

2/11/2009

$

7,000,000

6/1/2011

$

4,400,580

6/1/2011

$

78,891,502

N s

Flint Community Schools

Education Infrastructure Exterior Improvements

Flint

d e tt

Flint Community Schools

Flint

02262009

t i m

S

ub

Education Infrastructure Interior Improvements

t s e

qu

e R

K-12 School Modernization, Renovation and Repair: The Flint Community School District has not had a new school built since 1972. Declining enrollment and a weak local and state economy have greatly impacted operating revenues. The district has not been able to afford preventive maintenance and has made building repairs on an emergency basis only. Because of the preceding conditions, many improvements and upgrades are needed for our grounds and facilities. Due to enrollment losses, currently the district is "right-sizing" itself from 35 buildings to 18-20 buildings. The district has just completed a year long study of its facilities complete with an evaluation of all sites by an engineering and architectural firm. Site deficiencies were identified and repair/renovation costs have been established. Our remaining facilities would be greatly improved by the renovation and repair of sidewalks, parking lots and lighting. These improvements would also ensure safe access to our buildings for students, parents and busses. The estimated costs of these repairs and renovations is $78,891,502.00. 6/1/2009

Submitted Requests - Not Approved

238 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Flint Community Schools

Project Name

Project Description

Start Date

Youth Programs: Physical Fitness Camps

In partnership with the Crim Fitness Foundation, Michigan State University, and Hurley Medical Center, the Flint Community Schools will create and coordinate a five week, summer physical fitness camp for children at 23 elementary schools. The devastating impact childhood obesity has on learning is a clarion call to focus on the physical, emotional, and social development of children. Over 1,000 8-12 year olds will participate in a physical education curriculum that is designed to develop effective, cognitive and psychomotor domain of students, by providing fun-filled developmentally appropriate activities of movement skills and strategies, needed to participate in a variety of sports and games. Specific aspects of the five week development of higher fitness levels, knowledge of nutrition, thinking and problem solving, cooperation and healthy choices, and decision-making will be presented to students. The program includes physical fitness, hygiene, aquatics, body awareness, and health related physical activity. Pre and post assessments, President's Physical Fitness, will monitor the growth and development skills of 1,200 students. Qualified and certified physical f 6/1/2009

Flint

Adult Education

A sense of urgency spurs adults to seek further education in tough economic times. Adult Education is a viable means to employment, college preparation, parent education and productive citizenry in an economy of change. Adults 18 and over have been served by the public school district, the Flint Community Schools, for over 65 years at Mott Adult High School. The district serves over 500 adults in English as a Second Language (ESL), Pre-GED, GED, Adult Basic Education (ABE), high school diploma, school to work courses, and vocational education. The focus and purpose of the district's adult education program is to provide educational opportunities to parents and families of the district's student population to prepare them to earn a living wage. 8/1/2009

Flint

The installation of new HVAC controls that will significantly reduce the amount of Whiting Auditorium Energy Efficiency Improve- energy used heating and cooling The Whiting, Genesee County's premiere ments performance venue. The installation of new steam converters that are part of Whiting's heating system, Whiting Auditorium Heating System Upgrade replacing obsolete equipment and improving energy efficiency.

Flint

Flint Cultural Center Corp Flint Cultural Center Corp

300,000

6/1/2010

$

800,000

4/1/2009

5/1/2009

$

78,900

5/15/2009

6/15/2009

$

30,000

Flint Cultural Center Corp

Flint Cultural Center Corp

Flint DDA

Flint DDA

Flint

5/15/2009

6/15/2009

$

36,000

11/31/2010

$

1,420,000

MLK/NORTH SAGINAW STREET STREETSCAPING

Installation of paving, lighting, landscaping, benches, bike racks and trash recepticals. Includes vacation of First Avenue between Saginaw Street and Garland Street. The proposed project is expected to leverage additional private equity to the area and Carriage Town. Phase I was completed five years ago and has leveraged millions of dollars of investment in downtown Flint and has changed the image of Flint.

$

2,000,000

BUCKHAM ALLEY IMPROVEMENTS

Installation of paving, lighting, landscaping, benches, bike racks and trash recepticals. Project is expected to leverage millions more in private dollars in the heart of downtown Flint.

$

2,500,000

Wide Area Network Installation

tt i m

Flint

Kearsley Street-scape Improve-ments

ub

Flint

Flint

02262009

d e t

S

q e R

N s

st

The installation of a fiber optic Wide Area Network for voice and data that will link together Whiting Auditorium, Bower Theater, Longway Planetarium, Sloan Museum and the Flint Institute of Music on the Flint Cultural Center campus.

The construction of a redesigned segment of the Kearsley Street corridor (from Crapo Street to Walnut Street) that serves as the main access to the Flint Cultural Center, incorporating improvements to lighting, traffic flow, pedestrian access and aesthetics. 7/30/2010

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

e u

Flint

P P A

O R

Funding Request

8/1/2009

T O

Flint Community Schools

Expected Completion Date

239 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Flint DDA

Flint

Flint DDA - MDOT

Flint

Flint DDA - U.S. Army Corps of Engineers Flint

Project Name

Project Description

Start Date

Expected Completion Date

RIVERBANK PARK IMPROVEMENTS

Provides for improvements to a park designed by world-renowned landscape architect, Lawrence Halprin. Improvements would include getting the fountains and waterfalls operating. Repairing damaged concrete, replacing railings that do not meet code and planting ivy on concrete walls to mitigate graffitti. Much electrical repairs would also be made to lights and pumps. This section of the Flint River is the focual open space for downtown and connects to the UM-Flint campus. April, 2009

KEARSLEY STREET IMPROVMENTS

The Kearsley Street connection when finished will connect Mott College to the Cultura Center to the University of Michigan Flint to downtown to Kettering University. This project is directly connected to the proposed Miller Road/Chevrolet Avenue connection. The project would include new sidewalks, lighting, trees, signage and traffic controls.

ALTERATIONS TO FLINT RIVER FLOOD CONTROL PROJECT

Restoration of the Flint River between the Grand Traverse Avenue Bridge and the Third Avenue Bridge, past the Kettering University campus. This project would restore the Flint River ecosystem and would provide an appropriate setting for the proposed Kettering/Hurley medical school and expansion of Kettering University campus. It proposes the removal of the concrete banks that are cracked and falling apart and re-naturalize the river, attract fish, birds, butterflies and other wildlife. Envisioned as the centerpiece of the expansion of Kettering University's riverfront campus. U.S. Army Corps of Engineers Study Complete. July, 2009

T O

April, 2010

N s

D VE $

5,000,000

$

5,000,000

July, 2010

$

15,000,000

7/31/2010

O R

P P A

ARTreach is a high-priority program advancing Michigan’s vision for K-12 education to prepare students to be literate individuals, healthy and fit people, responsible family members, productive workers, involved citizens, and self-directed, lifelong learners. It is a comprehensive, cross-curricular initiative for at-risk K-12 students organized around major themes explored in reading series adopted by local schools. It incorporates the Flint Institute of Arts’ (FIA) outstanding permanent collection, temporary exhibitions, and public, family and educator programs to meet national, state, and local school reform goals. ARTreach is a model program utilizing authentic instruction (higher-order thinking, deep knowledge, substantive conversations, and connections to the world beyond the classroom) to provide a structure for infusing visual arts learning into language arts, mathematics, science, and social studies curricula to improve literacy and student achievement. 8/1/2009

Funding Request

Route (Infrastructure Only)

t s e

Flint Institute of Arts Flint Mass Transportation Authority (MTA) Flint Mass Transportation Authority (MTA)

Flint Mass Transportation Authority (MTA)

Flint

R d

$

385,000

Purchase of 10 inter-city coaches to replace 1989 RTS buses and support the MTA’s regional work-related service. Regional ridership is up 25% year-to-date and MTA has many requests for additional regional transportation to provide work rides for job opportunities outside of Genesee County.

$

5,000,000

Mid-Size CNG Hybrid Buses

Purchase of 20 mid-size buses for MTA’s peak period service. MTA has added routes and increased ridership by 34% year-to-date in response to customer needs and service requests. The vehicles will have a CNG hybrid configuration.

$

6,000,000

CNG Fueling module

Add CNG fueling capability to our present Hydrogen Generation Fueling Facility. Addition of a module for compressing and dispensing natural gas to the design/build RFP for a hydrogen generation and fueling station. The hydrogen station has been funded and the RFP is in final review by the Federal Transit Administration (FTA). This will add the CNG capability to the project and provide the opportunity for CNG to be added to our alternative fuels program.

$

1,000,000

ARTreach

Genesee County MI

Grand Blanc Township, Genesee County, MI

e t tt

Inter-City Coaches

i m

b u S

Genesee County, MI

02262009

u q e

Submitted Requests - Not Approved

240 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Flint Mass Transportation Authority (MTA)

City of Flushing, Michigan, on Pierson Road approximately 1/8 mile east of the intersection at Flushing Road Flushing Service Center

Construction of an MTA Service Center for the Flushing, Michigan service area. The facilities will provide customer service, administration, vehicle storage and light maintenance. The site is identified and building prints/specifications are replicated from other service centers. Green construction techniques will be used. Nineteen (19) permanent employees will be employed here. Construction will begin within 90 90 days from days. grant award

Flint Mass Transportation Authority (MTA)

Genesee County MI

Hybrid Electric Paratransit Vans

Purchase of hybrid electric paratransit vehicles (20) to replace vans from model years 1995-1997. The existing fleet averages over 364,000 life miles per vehicle.

ITS Phase III

Implementation of Phase III of MTA’s approved Intelligent Transportation Systems Plan. Phases I and II are underway. Phase III is designed and approved but not yet funded. Project includes Advanced Traveler Information System, Collision Avoidance equipment, and Maintenance Management Software.

Hybrid Vehicle Changeover

Upgrade fifty (50) New Flyer buses with a power plant modification. The modification involves the removal of a standard diesel engine and replacement with an advanced electric hybrid power plant. This project will substantially reduce the diesel fuel consumption of the MTA fleet.

Two-Way Mobile Radio System

This project will replace the existing two-way mobile communication system and upgrade from a DOS based version. The MTA’s mobile radio system is over 10 years old and will not be serviced any longer. Replacement parts will no longer be available after 2009. It must be replaced with digital technology, which will offer improved reliability and effectiveness. Mobile radios are installed on every MTA vehicle (342) 90 days from plus base station and sub stations. grant award

Flint Mass Transportation Authority (MTA) Flint Mass Transportation Authority (MTA)

Genesee County MI

Genesee County, MI

Flint Mass Transportation Authority (MTA)

Genesee County, MI

Flint Mass Transportation Authority (MTA)

On M-57 (Vienna Rd) 1/4 mile east of I-75, Vienna Township, Genesee County, Michigan Clio Service Center

Expected Completion Date

Funding Request

D VE

1 year from contract award

$

1,750,000

$

1,000,000

$

2,000,000

$

10,000,000

9 months from contract award

$

1,500,000

Construction of an MTA Service Center for the Clio, Michigan service area. The site is identified and building prints/specifications are replicated from other service centers Green construction techniques will be used. Fifteen (15) permanent employees will be90 days from employed here. Construction will begin within 90 days. grant award

1year from contract award

$

2,300,000

In order to spur economic and housing development along the Oakman Boulevard corridor which was devastated by a 1997 tornado, Focus: HOPE will install new streetscape improvements along Oakman Boulevard from Linwood to Hamilton. This project leverages previous Brownfields redevelopment in this corridor by creating a connecting corridor and green streetscape improvements which will further the economic generator impact Focus: HOPE has already had, serving to connect a lowincome Detroit neighborhood to the regional economy by attracting sustainable development to the community and generating immediate jobs. This project includes: a) Barrier-free walks with sustainable street furniture, b) Way-finding graphics with urban braille signage, c) The establishment of bicycle lanes, d) Sustainable utility improvements including stormwater infiltration devices, nonpoint source (NPS) pollution reduction, e) The extension of Green streetscape improvements along Oakman Boulevard from Rosa Parks to Hamilton street. f) The creation of a Green streetscape gateway into the Focus: HOPE campus 11/1/2009

6/1/2011

$

6,600,000

A T

s

t s e

PP

O N

u q e

O R

Route (Infrastructure Only)

R d

Focus: HOPE

i m

e t tt

ub

Detroit and Highland Park, Focus: HOPE Oakman Boulevard Michigan Streetscape Renovations

S 02262009

Submitted Requests - Not Approved

241 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Focus: HOPE

Detroit

Project Name

Project Description

Start Date

Focus: HOPE Workforce Development Expansion Project

For workers to acquire the skills and knowledge needed to compete in an increasingly global economy, Focus: HOPE plans a workforce development expansion project that would provide classroom, lab, and staff space for future jobs training programs adjacent to the existing Focus: HOPE Machinist Training Institute ("MTI"). The expansion program involves flexible process training and retraining for a workforce that needs assistance in transitioning from one career to another and may include anything from basic construction to technical skill fields such as advanced machine programming, robotics, etc. The project involves: a) Demolition of existing obsolete Focus: HOPE Buildings adjacent to the Focus: HOPE MTI building, b) Construction of new workforce development building including classroom, training lab, and staff office/administrative space totalling 40,000sf in area, c) Completion of necessary underground infrastructure improvements, a fire loop, utilities and parking. d) Acquisition, demolition and remediation of the adjacent "production services" property and building (would commence within 90 days). e) Relocation of Focus: HOPE's Rese 11/1/2009

Focus: HOPE

Focus: HOPE

Detroit

Detroit

Detroit

02262009

P P A

O R

Funding Request

$

11,600,000

Center For Advanced Technologies Workforce Development Initiative

Focus: HOPE will modify an existing workforce development facility, the Center for Advanced Technologies (CAT) to support new, agile, employer-driven and customized worker training programs as well as programs to encourage entrepreneurship and small business support. This project includes: a) Additional classroom / lab space and supporting infrastructure required for planned workforce and youth development initiatives. b) Mechanical infrastructure upgrades. c) Removal, clean-out and infill existing filtration systems to provide additional floor space for new workforce development facilities. d) Renovation of the existing conference center for use by the workforce development program and future conference center opportunities. e) Small Business Incubator with offices and floor space for operations and storage. 11/1/2009

4/1/2010

$

3,800,000

Focus: HOPE Youth Development Center Expansion

The Focus: HOPE Center for Children was established in 1987 and provides successful and highly-regarded early childhood preschool education, infant and toddle care, summer day camp, and a before- and after-school care program for children of colleagues, students and community residents. Focus: HOPE wishes to build on this success by expanding it as the renamed Youth Development Center. This project includes a 15,000 square foot building addition that would create an addition capacity of 225 children, bringing overall capacity to 450. 11/1/2009

9/1/2010

$

4,200,000

Most Focus: HOPE programming today is intended for young children and adult students (post-high school). For years, charter school operators have expressed interest in partnering with Focus: HOPE to offer school-age education on our campus. This project will prepare a facility for a K-8 charter school program for children of community residents, students, and colleagues. This project includes a) Complete renovation (with some new construction) of an existing vacant industrial building located in the center of the Focus: HOPE campus, b) Parking lot renovation. 11/1/2009

6/1/2011

$

8,200,000

d e tt

t i m

Focus: HOPE Youth Development Charter School Initiative

b u S

st

e u

q e R

N s

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

6/1/2011

T O

Focus: HOPE

Expected Completion Date

242 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Focus: HOPE

Detroit

Project Name

Project Description

Start Date

Focus: HOPE Center for Community

As Detroit faces a veritable crisis in connecting its population with the regional economy, and the community around the Focus: HOPE campus lacks modern facilities for human service providers to operate in, Focus: HOPE's Center for Community aims to involve and connect the local community with the regional economy through workforce development programs that provide necessary hard skills for gainful employment combined with the soft skills necessary for sustained career success. This project involves 1) state-of-the-art recreational facilities addressing health, nutrition and fitness issues, 2) work support tools for working people to access benefits for educational loans/scholarships, pooled health care coverage, etc., 3) financial tools including financial literacy, coaching, financial services such as Individual Development Accounts (IDAs), home ownership and emphasizing stable employment, 4) safe and educational after school programs, 5) anti-domestic violence programs, and 6) a volunteer and visitor services center. This project includes: a) The demolition and Brownfields cleanup of two underutilized buildings located in the cente 11/1/2009

Federal Commodity Supplemental Food Program Warehouse / Distribution Center

Focus: HOPE administers the U.S. Department of Agriculture's Commodity Supplemental Food Program (CSFP) for southeast Michigan, providing 41,000 pregnant women, postpartum mothers, young children, and senior citizens with a monthly package of nutritionally balanced food. This highly efficient federal program provides this box, which has a retail value of over $50, at a total cost of approximately $20. Existing warehouse and main campus distribution centers are in desperate need of new facilties in order to continue this vital program. This project includes the following: a) Demolition of existing rundown and decaying buildings, b) Brownfields cleanup of property, c) Construction of new CSFP warehouse and distribution center with solar panel roof, d) Sitework including U.G. utilities, parking, fencing, etc., e) Connecting link to the main campus, f) Renovation of the 3 satelite distribution centers located in Detroit and Inkster, Michigan. 11/1/2009

Focus: HOPE

Detroit

13,100,000

10/1/2010

$

21,000,000

Over the last decade, improvements in the production and installation of solar panels have enabled organizations to become more energy efficient at lower costs. Focus: HOPE aims to demonstrate the possibilities of such energy efficiency by installing an integrated solar panel roofing system on all Focus: HOPE campus buildings. The energy output for the system is projected to be 2,800,344 kwh/year, which will provide power for campus programs. This equates to a yearly operations budget savings of $250,015.00 7/1/2009

11/1/2010

$

17,900,000

In 2008 Ford River Township received funding from the Michigan Department of Environmental Quality’s (MDEQ) Drinking Water Revolving Fund (DWRF) program to complete water system improvements. The proposed improvements included the installation of a 2nd watermain crossing of the Ford River, the installation of water meters and meter pits and the replacement of service lines under the existing roadways. Due to the outcome of the construction bids received, the project was scaled back in order to fit into the Township’s construction budget. The items removed from the project include the replacement of the service line crossings on L.15 Lane and K Road. These services line crossings consist of deteriorated galvanized piping and are in need of replacement. The proposed stimulus project submitted includes the replacement of all crossings which were eliminated from the 2008 project. 5/1/2009

9/1/2009

$

200,000

Forest Area Community Schools Forest Area Community Schools

$

154,215

$

234,000

N s

t s e

e t tt

b u S

Ford River Township

Phase II - Water System Improvements Project

u q e

High school roof replacementFife Lake Fife Lake / Boardman twp. Elementary gym roof replacement

The Forest Area High School roof and Fife Lake Elementary gym roof are both in need of replacing. The district will replace the roof during the summer of 09 for the start of the school year.

Fife Lake/Boardman twp. Gym renovation

Replace original rubber gym floor, bleechers and lighting

02262009

Route (Infrastructure Only)

D VE $

R d

Sustainable Green Energy Initiative: Solar Roof Installation

Detroit

i m

Ford River Township

P P A

O R

Funding Request

11/1/2011

T O

Focus: HOPE

Expected Completion Date

Submitted Requests - Not Approved

Summer 09

Fall 09

243 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Forest Area Community Schools Forest Area Community Schools Forest Park School District Forest Park School District Forest Park School District Forest Park School District

Project Name

Project Description

Fife Lake/Boardman twp. And Fife Lake twp. Parking lot and walk replacement. Fife Lake/Fife Lake twp. City of Crystal Falls, Michigan City of Crystal Falls, Michigan City of Crystal Falls, Michigan City of Crystal Falls, Michigan

Expected Completion Date

Start Date

Asphalt parking lots at both sites need to be resurfaced. Concrete approaches at Fife Lake Elementary and Forest Area Middle School need replacing. Concrete handicap ramp at High School needs replacement. Concrete retaining wall at Fife Lake Elementary needs to be replaced.

$

72,500

$

15,000

$

6,360

$

22,500

8/1/2009

$

25,379

8/1/2009

$

34,750

Drainage system

Repair drainage system around building. Currently floods building in spring.

6/9/2009

8/9/2009

Energy Efficiency

4/1/2009

Safety

Remove and replace light switches in 106 rooms with energy efficient light sensors. 2/1/2009 Remove and replace 3 domestic hot heaters for our entire heating/boiling system with energy efficient units. 2/1/2009 Remove unsafe floor tile in front entrance with green products that reduce life cycle costs of labor and chemical applications 6/8/2009

Energy Efficiency

Remove and replace 33 exterior doors with energy efficient doors and thermal, broken, aluminum doors and frames and access controls with a barrier free door acesss including a keyless security system.

Energy Efficiency

O R

P P A 4/1/2009

Funding Request

4/1/2009

D VE

Route (Infrastructure Only)

Fort Gratiot Township, St. Fort Gratiot Township Clair County Energy Efficient Municipal Office Building

Funding assistance would allow Fort Gratiot Township to build a new municipal office using green energy saving technoligies and self sustaining options such as solar/geothermal heating and cooling and wind generator for electrical service. April, 2009

Dec., 2009

$

2,700,000 NA

Fort Gratiot Township, St. Fort Gratiot Township Clair County Pine Grove Sanitary Sewer District

Install sanitary sewer lines to service residential and municipal areas; including three municipal buildings and one middle school sanitary sewer where there are aged and failed septic systems or a septic lagon. April, 2009

Dec. 2009

$

5,700,000

Four Corners Montessori Academy

Madison Heights

Four Corners Montessori Academy

Media equipment in all classrooms to allow for video streaming, connection broadcast systems, projection systems for teachers. 7/1/2009

9/1/2009

$

20,000

Four Corners Montessori Academy

Madison Heights

Four Corners Montessori Academy

Equipment for expanding humanities, arts, and recreation programs to include collapsible risers, playground equipment, etc.

7/1/2009

9/1/2009

$

40,000

To enhance technology with fiber optic connection with local RESD, wireless broadband connectivity, provide equipment for one computer lab, classroom smart boards, updated laptops for teachers. Green standards would be applied.

7/1/2009

9/1/2009

$

80,000

Install 2 hour fire rated door wall, repair broken sidewalks, door assemblies, repair improperly installed electrical panels, repair boiler.

7/1/2009

9/1/2009

$

100,000

To construct an Elementary (Grades K-8) Facility by GREEN standards.

7/1/2009

$

6,000,000

8,500,000 M-83

Four Corners Montessori Academy

Madison Heights

Four Corners Montessori Academy

Four Corners Montessori Academy

Madison Heights

Four Corners Montessori Academy

Four Corners Montessori Academy

Madison Heights

Four Corners Montessori Academy

m b u

Frankenmuth Youth Frankenmuth/Frankenmut Sports Association h Frankenmuth Recreation Center Frankfort-Elberta Area Schools Frankfort New doors in old cafeteia

S

Fremont Area District Library

City of Fremont

s t s

-N

e u

eq

R d

e t t

it

T O

The Frankenmuth Recreation Complex is a multi-use recreation complex supporting indoor and outdoor activities on a year-round basis. This complex will include 4 indoo recreation courts (baskeball/volleyball size), a community swimming pool, indoor & outdoor walking track and path and 10 AYSO soccer fields. The project will provide recreational opportunities supporting Frankenmuth's critical tourism industry. MSU feasibility study suggests 30 new or preserved jobs as a result of this project. 5/1/2009

4/30/2010

$

New doors in old cafeteia

5/20/2009

9/1/2009

$

6,700

w/in 30 days of notification

w/in 60 days of notification

$

84,315

$

5,700,000

Install an Energy Management System in the 49,000 sq ft. Fremont Area District Library. The system would enable the library to reduce energy usage, ensure lower Fremont Library Energy Management System maintenance costs, and enhance the comfort of patrons.

Reconstruction and renovation of existing shoreline dike system constructed 35 years Frenchtown Charter Frenchtown Charter Township Resort District ago by U.S. Army Corps of Engineers to prevent flooding to the Beaches Area of the Frenchtown Township Township, Monroe County Authority Dike Rehabilitation Projects Phase I township.

02262009

Submitted Requests - Not Approved

244 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Reconstruction and renovation of existing shoreline dike system constructed 35 years Frenchtown Charter Frenchtown Charter Township Resort District ago by U.S. Army Corps of Engineers to prevent flooding to the Beaches Area of the Frenchtown Township Township, Monroe County Authority Dike Rehabilitation Projects Phase II township.

Friends of the Felt Estate & Laketown Township

Allegan County

Saginaw Fruitport Fruitport

Fruitport Township

Fruitport Township

Fruitport Township

The Theodore and Carl Roethke homes are adjacent residences formerly belonging to the family of the Michigan Pulitzer Prize-winner, Theodore Roethke. The Friends of Theodore Roethke have undertaken "to promote Theodore Roethke's literary heritage by raising funds to purchase and restore" the homes. Theodore's will be used as an interactive museum, while Carl's will be developed as a cultural/educational center. In 2008, the poet's centennial year, programs supported by NEA and MHC were sponsored by Friends of Theodore Roethke resulting in $55,000 input to area economies and a prestigious Saginaw "All Area Arts Award" for adding to the quality of community life. Saginaw Mayor Joyce Seals said the Roethke home "gives hope to Saginaw." Architectural Study has been donated by Leslie Tincknell, FAIA, to address the renovation goals, including: classrooms for arts education, literacy improvement, adult reading instruction, career counseling; multimedia facilities for education and Museum, Greenhouse,and Development Center Serve Community in the name of poet, publishing; bedrooms for visiting artist-teachers; greenhouse pavilion for arts events, environmental education, gardening programs, writing camps, landscape study; menta5/1/2009 Theodore Roethke Water Water Sewers Sewers 600 l.f. of 8" distribution water main to connect a dead end and provide service to a Mark Street Water Main residential area and improve fire flows 4/9/2009

Dangl Road Water Main

Fruitport Township

Fruitport Township

Brooks Road Water Main

Fruitport Township

Fruitport Township

Broadway Avenue Water Main

Fruitport Township

Fruitport Township

$

Restoration of a 1920's estate (which historically had alternative energy!). Implementation of Dorr Felt's Wave Power machine, windmills, water warming reservoir, and organic farm. Creation of a online farmer's market. Partnerships with local universities bringing inner city students to the estate to plant and cultivate crops, run the restaurant, learn business principles. Immediately

T O

Friends of Theodore Roethke Foundation, non profit 501c3 Fruitport Township Fruitport Township

Fruitport Township

Shore Acres Farm/The Felt Estate

tt i m

d e t

Village of Fruitport Sanitary Sewer

s t s

2010-11

O R

7,900,000

D VE $

2,000,000

P P A

-N

e u

Funding Request

Route (Infrastructure Only)

5/1/2011

$ $ $

3,000,000 2,100,000 Yes 11,800,000 Yes

6/9/2009

$

75,000 Mark Street

12" Transmission water main to connect two dead ends in their water system to improve reliability, fire flows and water quality. Recommended in their 2008 MDEQ reliability study

4/9/2009

7/9/2009

$

530,000 Dangl Road

16" Transmission water main to connect two dead ends in their water system to improve reliability, fire flows and water quality. Recommended in their 2008 MDEQ reliability study

4/9/2009

7/9/2009

$

885,000 Brooks Road

12" Transmission water main to connect two dead ends in their water system to improve reliability and fire flows. Recommended in their 2008 MDEQ reliability study 7/9/2009

10/9/2009

$

615,000 Broadway Avenue

Sanitary Sewer to service the Village of Fruitport including the elementary, middle and high school, commercial areas and residential areas. Sanitary sewer service is not currently available to the area and there exists a high groundwater table and concerns that many of the failing systems are discharging into Spring Lake. The project would consist of gravity sewer, pumping stations, force main and street reconstruction. Sept. 2009

10/1/2010

$

q e R

11,800,000

b u S 02262009

Submitted Requests - Not Approved

245 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Full Circle Media Gage Products Company Gage Products Company Gage Products Company

Gage Products Company

Ludington To be determined Ferndale

Ferndale

Ferndale

Project Name

Project Description

State Mental Hospitals once typified the approach to psychiatric care. But advances in drug therapy and maturing treatment philosophies emptied the nation's "insane asylums" decades ago. The Traverse City State Hospital -- to offer a symbolic local example -- closed in 1989 after 100 years' psychiatric service to reopen in 2005 as an upscale residential/commercial community. Supplanting the institutional icons of the One-Flew-Over-the-Cuckoo's-Nest era, community mental health (CMH) agencies model new definitions of "recovery." Where once clinicians imposed "cures" on their patients, today's CMH professionals now assist clients who articulate and achieve their own personal life goals. Relying primarily on the success stories of its clients, a half-hour documentary will profile the West Michigan Community Mental Health System as an example of current therapy trends, paying special attention to 1. developing and conveying the CMH "recovery culture" as one which levels a decadesold heirarchy of care providers and clients. 2. the challenges of establishing a West Michigan Community Mental Health Film therapeutic trust between CMH providers and... (a) Oceana County's migrant comm1/28/2009 Construct another recycling facility to accommodate growing volumes of industrial Recycling Facility solvent streams requiring reclamation. 8/1/2009 In Production Administration Building replace all single pane aluminum frame wildows Window Energy Reduction Project with new energy efficient windows. 4/1/2009

8/1/2010

$

20,000,000

8/1/2009

$

60,000

65,000

Delivery Backhaul Trailer Project

Replace single-way deliveries of product and pick-up of waste with roundtrip deliveries by utilizing multi-compartment trailers for closed-loop recycling customers. Purchasing three (multi-compartment) trailers for product/waste delivery-backhauls thereby reducing fuel use and environmental impacts. 4/1/2009

1/1/2010

$

600,000

Resource Conservation Project

Reduce solvent waste and air emmissions and conserve resources by installing a single tote blend station, reducing pipe size around solvent blend pumps and tote filling system, replacing gear flow meters with mass flow meters, installing a cooling water filter and installing radar level indicators in all storage tanks.

3/1/2009

12/1/2009

$

613,400

January '09

October '10

$

3,000,000

Community Technology Center Project

Develop a multifunctional, multipurpose technology center as a shared resource for use by Library, City, Schools, Family Resource Center, Emergency Management Team, Community Coalition, and vital community organizations. 3,200 square feet of space will be renovated (flooring, painting, install drop-ceiling, rewire, install efficient lighting,...) to accomodate the Technology Center. The Center will include 12-15 desktop computers, a mobile computing lab with 8-10 laptops, building-wide WiFi network, white boards, ELMO projector, and other technology requested by project partners. The Center will enable project partners to collaborate more on programming and training to the benefit of the residents. An IT Tech will be contracted to setup server, WiFi network, and computers, and to secure computers for a public use environment. Staff will be hired to teach basic computer skills, perform basic troubleshooting, and to coordinate room/mobile lab usage among project partners. When not reserved for project partners, the Center may be rented by outside groups. The fees for such rentals will provide sustainability for the project. 3/9/2009

12/9/2009

$

233,000

Demolition and Reconstruction of McCree Parking Deck

Demolition and reconstruction of the Genesee County owned 813 car parking deck in downtown Flint. This structure provides parking for the Genesee County Health Department, County district courts, and the City of Flint district courts. This structure is a safety issue to it's users. 4/1/2009

4/1/2011

$

t i m

s t s

e u

eq

R d

e t t

b u S

02262009

20,000

$

Gaines Charter Township, Kent County, MI Diaz Hill Water System

Flint

$

7/1/2009

Gaines Township

Genesee County

Fall 2009

4/1/2009

-N

Construction of a new watersystem in existing neighborhoods currently served by private wells.

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

Warehouse Energy Reduction Project

Ferndale

Garden City

T O

P P A

O R

Funding Request

In heated 40,000 sq. ft. Warehouse replace building replace steel frame single pane windows with a cinderblock wall that has foam insulation inside the cinderblocks to reduce heating fuel usage by 40%.

Gage Products Company

Garden City Public Library

Start Date

Expected Completion Date

16,000,000 Beach Street

246 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesee County

Genesee County

Flint

Flint

Genesee County Drain Commissioner Argentine Township, Division of Water and Michigan Waste Services Serves Entire Region

Genesee County Drain Commissioner Argentine Township, Division of Water and Michigan Entire Waste Services Region

Genesee County Drain Commissioner Division of Water and Waste Services

City of Burton, Montrose Township, Genesee Township, and Richfield Township, Michigan

Genesee County Drain Commissioner Fenton Township, Division of Water and Michigan Waste Services Serves Entire Region

Genesee County Drain Commissioner Fenton Township, Division of Water and Michigan Waste Services Serves Entire Region

Project Name

Energy Saving & Emergency Operations Center Improvements

Demolition and Reconstruction of the Genesee Valley Regional Center

Demolition and reconstruction of the Genesee Valley Regional Center which provides secure residential detention for juveniles 10 through 17 years of age. This facility currently employs 50 people. Due to safety issues, this facility could close if the facility is not reconstructed. 4/1/2009

Vacuum Sewer District #7 Genesee County

The project would improve and provide additional safety to the lake environment in Argentine Township. The project will replace an aging gravity sewer system on Stages Island with a vacuum sewer system, which would eliminate sewer spills in the waters of the State and a high recreation area. 6/1/2009

Solar Powered Mixing System Genesee County District #7 Treatment Plant

This project will improve the treatment capacity of the District 7 Treatment Plant and improve the environment of the Shiawassee River by improving the wastewater effluent quality. This project involves replacement of the electrical motors at the District 7 Treatment Plant with solar powered mixing units. It will also add new mixing units to increase treatment of the wastewater effluent quality before it is discharged to the Shiawassee River. This will reduce the electrical requirements and carbon footprint of the treatment plant by 80%. This project will provide economic stimulus to the U.S. manufacturers in the amount of $750,000 and $750,000 to the local skilled trades. 6/1/2009

Generator Program County

This project will provide a safety measure to protect the environment in Genesee County by adding emergency generators to pump stations at key locations to prevent sewer spills during power outages. This project will add security to our collection system in the event of any incidents similar to the widespread power outages in 2003. This project would provide generators to five pump stations. 3/1/2009

$

19,250,000

4/1/2010

$

750,000

1/1/2010

$

1,500,000

Genesee

10/1/2009

$

750,000

The purpose of this project is to improve and expand the digester treatment system at the District 3 Treatment Plant, to produce energy and provide environmental improvement to the Shiawassee River. Construction of methane production facilities at the District 3 Treatment Plant will utilize biosolids to reduce the volume of waste generated, reduce the carbon footprint at the treatment plant, and develop a renewable energy supply. The project will provide an economic stimulus to our U.S. manufacturers in the amount of $2 million for equipment and $2.5 million to the local skilled trades. 6/1/2009

d e tt

District #3 Methane Production Genesee County

1/1/2011

$

4,500,000

t i m

The existing treatment plant is located on a rural gravel road. The project would construct approximately one mile of road and one bridge that would link the plant to a main class A road. This project would provide economic stimulus to the skilled trades in roadway construction and bridge work. This project would benefit the plant by providing a "shorter" distance for the plant's routine hauling. 6/1/2009

Roadway Improvement Genesee County Distrct 3 Treatment Plant

4/1/2010

$

2,000,000

This project will replace existing facility with new energy-efficient, environmentally friendly housing for personnel and equipment dedicated to operating and maintaining the water and sewer systems of Genesee County. Additionally, this project will replace the energy inefficient facility that houses the staff that is responsible for protecting surface water in Genesee County. 6/1/2009

7/1/2010

$

7,000,000

t s e

PP

O N

qu

e R

Submitted Requests - Not Approved

O R 4/1/2011

Route (Infrastructure Only)

D VE

3,622,500

s

010/1/10

Funding Request

$

A T

Genesee County Drain Commissioner Division of Water and Office and Conference Center Genesee Waste Services Flint Township, Michigan County Drain Commissioner Offices

02262009

Start Date

Energy saving and operation improvements will be made to the Genesee County Administration Building including the Emergency Operations Center such as exterior window replacement, ugrade lighting & controls, air distribution and temperature control improvements, replacement of40 yr old steam boilers, and replacement of emergency generator 4/1/2009

ub

S

Project Description

Expected Completion Date

247 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Genesee County Drain Commissioner Division of Water and Flint Township, Michigan Septage Receiving Station Waste Services Serves Entire Region Genesee County

This project will provide the addition of a septage receiving station to the County's treatment system, which will improve the environment by providing a place to dispose of septage waste from a region where sanitary sewers are not available. This project will provide an economic stimulus of $1 million to the local skilled trades, mechanical contractors, general contractors, electrical contractors, and material suppliers. This project will also screen and sample the sewage prior to entering the system for flammables and toxic waste. This will prevent the toxic sewage from entering the sanitary sewer system and wastewater treatment facility, preventing an upset to the plant and potentially a discharge quality issue into the Flint River. 3/1/2009

Genesee County Drain Commissioner Division of Water and Flint Township, Michigan Collection System - Pump Station #1 Waste Services Serves 50% of the County Relocation Genesee County

Currently, Pump Station #1 is sited in the 100-year floodplain of the Swartz Creek. In 2001, the pump station and site were flooded during a significant rain event. The County received Federal Emergency Management Agency Grant monies to perform some emergency repairs. At that time, it was also recommended to relocate the pump station. The County has acquired additional land to relocate the new pump station above the 100 year floodplain elevation. The design has been complete and has been permitted by the MDEQ. This project will protect the Swartz Creek from further vulnerability and will replace an aged facility. The project will provide immediate employment to our local skilled trades. 3/1/2009

Genesee County Drain Commissioner Genesee County, Lapeer Division of Water and County, and Sanilac Water Supply Initiative Waste Services County, Michigan County

O R

D VE $

1,500,000

3/1/2010

$

12,000,000

The project will replace aging infrastructure supplying water to the communities of Flint and Lapeer and the residents three counties: Genesee, Lapeer, and Sanilac. The construction of 85 miles of water pipeline and treatment plants will serve 500,000 residents of central Michigan. The project would provide safe, reliable, high quality drinking water to this central region of Michigan. This is vital to the return of long-term growth of manufacturing to this region. Sustainable water supply is critical to the County. 100% of water used in this region is returned to the watershed, resulting in no net loss to the Great Lakes basin. The existing pipeline is over 50 years old and has had numerous failures due to the age of the pipeline. The project will provide economic stimulus of $3 million to the design profession, $150 million to the U.S. manufacturers, specifically, the pipe manufacturers, $100 million to the underground contractors, and $47 million to skilled trades of the general contractors, mechanical contractors, and electrical contractors. This project will allow this region of the State to7/1/2009

7/1/2013

$

300,000,000

The purpose of this project is to eliminate transportation of hazardous materials on highways and public roadways. It will reduce the use of high electrical demandproduced chemicals by construction of an onsite chlorine generation facility at the Anthony Ragnone Treatment Plant. This system will replace our one-ton container of liquid chlorine, which is transported via the roadway from manufacturing facilities to the treatment plant. The byproducts of onsite generation include hydrogen, which is a renewable energy. By eliminating transportation of chlorine via the roadway, we have increased security of the facility and eliminated the inherent risks when transporting hazardous chemicals. This project will continue to provide treatment to the effluent while eliminating the public transport of a toxic liquid. In capturing the hydrogen, we produce a renewable energy. This project would provide economic stimulus to the Chlorine Generation Genesee County Anthony U.S. manufacturers in the amount of $9 million, and the local skilled trades would Ragnone Treatment Plant receive $6 million. 9/1/2009

3/1/2012

$

15,000,000

T O

1/1/2010

Funding Request

Route (Infrastructure Only)

P P A

N s

t s e

u q e

R d

Genesee

e t t

t i m

b u S

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Serves Entire County

02262009

Submitted Requests - Not Approved

248 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Serves Entire County

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Entire County

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Entire County

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Serves Entire County

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Serves Entire County

Project Name

Clarifier Project Treatment Plant

Anthony Ragnone

02262009

The purpose of this project is to rebuild and expand the secondary treatment system of the Anthony Ragnone Treatment Plant, which will improve the quality of treatment to the Flint River. The project includes the construction of two new final clarifiers and reconstruction of eight existing clarifiers. It will increase secondary treatment capacity by 10 mgd, which will improve wastewater quality to the Flint River. This project will provide an economic stimulus of $7 million to the U.S. manufacturing sector and $8 million to the local skilled trades - general contractors, mechanical contractors, and electrical contractors. All permits have been applied for or received. 3/1/2009

10/1/2009

$

750,000

10/1/2009

$

1,000,000

9/1/2010

$

7,000,000

The project will provide security and safety to the residents and environment of the property surrounding the Anthony Ragnone Treatment Plant . The project would reroute 2 " miles of road, which runs through the existing plant. This would allow the County to improve security at the treatment plant, especially around the chemical storage facilities, and would provide added safety to the personnell. The project would provide an economic stimulus to the skilled trades in the road-building sector in the amount of $2 million. 6/1/2009

11/1/2009

$

2,000,000

The funds for this project will be used for development of a renewable energy and improvements to the environment by improving the discharge of treated wastewater and reducing the amount of biosolids. A digestion facility at the Anthony Ragnone Treatment Plant will be constructed, which will extract methane, a renewable energy from the wastewater biosolids, process it, and transfer it to the local gas supplier for distribution to the local area. The project will result in a reduction of biosolids produced at the treatment plant and will reduce the carbon footprint of the facility. It would also reduce chemicals transported to the treatment plant required to reduce pathogens in the biosolids. The project will provide an economic stimulus to the engineering profession in the amount of $2 million dollars, U.S. manufacturers in the amount of $13 million, and skilled trades, general contractors, mechanical contractors and electrical contractors in the amount of $10 million. 9/1/2009

3/1/2012

$

25,000,000

P P A

Blower Project Genesee County Anthony Ragnone Treatment Plant

Chlorine Contact-Outfall Genesee County Anthony Ragnone Treatment Plant

This project would improve the environment and develop a renewable energy source. The project would consist of the reconstruction of the chlorine contact tanks at the Anthony Ragnone Treatment Plant and include a hydraulic fall, which will allow the County to extract hydroelectric power from the outfall as it descends from the treatment plant to the Flint River. The project would reduce the carbon footprint of the treatment plant. 9/1/2009

d e t

Methane Production Gensee County Anthony Ragnone Treatment Plant

T O

s t s

-N

3/1/2009

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

15,000,000

The purpose of this project is to convert our existing 3-stage aeration blowers to a more efficient 2-stage blower. This project will reduce our electrical demand by 5%, reducing our carbon footprint and increasing our electrical efficiency. The project would involve the rebuilding of the blowers at a U.S. manufacturing facility putting skilled labor to work for approximately 6 months.

Road Re-Route Genesee County Anthony Ragnone Treatment Plant

O R 6/1/2010

Funding Request

$

Railing Project Genesee County Anthony Ragnone Treatment Plant

m b u

S

Start Date

The purpose of this project would be to improve employee safety in and around the wastewater treatment plant. The original plant was constructed in 1971. Since that time, new requirements have been developed for handrail safety. Additionally, this wil reduce the annual maintenance costs to the county. The project would employ local skilled trades in the removal and installation of new railing. 3/1/2009

itt

Genesee County Drain Commissioner Montrose Township, Division of Water and Michigan Waste Services Serves Entire County

Project Description

Expected Completion Date

249 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesee County Drain Commissioner Vienna Township, Division of Water and Michigan Waste Services Serves Entire Region Genesee County Drain Commissioner Vienna Township, Division of Water and Michigan Waste Services Serves Entire Region

Project Name

Sewer Cleaning Project Township

Project Description

Vienna

Dave Drive Sanitary Sewer Project Township

Genesee County Drain Commissioner Vienna Township, Division of Water and Michigan Entire Waste Services Region Linden Road Watermain

Start Date

Expected Completion Date

This project would clean and video tape the sanitary sewer system of Vienna Township and would repair/replace damaged sewers to improve the performance and reliability of the sanitary sewer system. This project will be broken into three contracts and would be available for immedate construction. 3/1/2009

Replace 1,300 feet of 10" sewer on Dave Drive. This is a section of sewer that needs immediate replacement. This project is totally designed and could be let for Vienna immediate construction. The work would cost approximately $289,000.00. Project can be under construction in three months. 3/1/2009

9/1/2009

P P A

This project would connect the existing 18" line on Linden Road, constructing 2,700 feet to the existing 12" line on Wilson Road, constructing 300 feet. The new line greatly enhanced the fire protection to the school. This line would cost approximately Vienna Township $598,650.00. The project can be under contract in three months. 6/1/2009

T O

O R 9/1/2009

D VE

12/1/2010

GCFMC is a non-profit organization that opened its doors in 1991. The clinic is driven by compassion and care of the general and medical communities to provide free health care services to the uninsured working poor in Genesee County. The Free Clinic serves about 3,000 patients a year. The clinic is located in an old building. No major renovation work was taken place since that time. At present the clinic experiences a very tough situation: almost all rooms and hallways inundated with mold. The clinic attempts to solve the problem by repainting the walls did not help. It is time to take more drastic measures such as carpet change, cleaning of heating and ventilation systems and crawlspaces, ozone sanitation of crawlspaces and installation of ultraviolet light system in each HVAC unit. Inability to provide a safe working environment for volunteer professionals, backbone of GCFMC, can jeopardize the As soon as funds very existence of the clinic. will be available Within 6 months

N s

t s e

Genesee County Free Medical Clinic Flint

Mold and Safe Working Environment

Genesee County Free Medical Clinic Flint

The Free Clinic is planning to expand its Prescription Assistance Program by hiring an additional Enrollment Coordinator. It will help the clinic continue reducing its one of the biggest items of budget expenses. It will positively effect the ability of the clinic to supply its patients with needed medications as well as increase the sustainability of As soon as funds will be available Within 6 months Expansion of Prescription Assistance Program the clinic operation.

Genesee County Health Department

u q e

R d

e t tt

Genesee County Land Bank Flint

02262009

$

200,000

$

300,000

$

600,000

$

15,000 .

$

20,000 .

McCree North Health Center Modernization

The McCree North Health Center is owned by the County of Genesee, Michigan, and houses clinical programs of the Genesee County Health Department. It is located in the northern section of the City of Flint where residents are at high risk for poor and racially disparate health outcomes. Services provided include: WIC (Women, Infants, and Children Supplemental Nutrition Program), STD/HIV Outreach and Partner Notification, Immunizations, Breast and Cervical Cancer Screening, Family Planning, and Pregnancy Testing and Counseling. Due to the age of the building and the cost o needed modernization, this important health services center is at risk for closure. $192,000 is requested, to be utilized as follows: $100,000 to replace roof; $40,000 to replace roof top HVAC units; $50,000 to repair/repave parking lot; $2,000 to repair/replace perimeter fence. 5/1/2009

9/30/2009

$

192,000

CHEVROLET BROWNFIELD SITE

Clean up and remediation of the site known as "Chevy in the Hole", on both sides of the Flint River, from the Grand Traverse Avenue Bridge to the Third Avenue Bridge. The new use of the site would include medical school buildings, research buildings, private medical institutions, academic buildings and a new riverfront arena. Sasaki Master Plan complete and Brownfield Plan complete.

August, 2010

$

10,000,000

i m

Flint

Funding Request

b u S

Submitted Requests - Not Approved

April, 2009

Route (Infrastructure Only)

250 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Genesee County Land Bank Flint

Genesee County Land Bank Authority (GCLBA) Flint

Project Name

Project Description

Start Date

Expected Completion Date

BUICK CITY BROWNFIELD SITE

Clean up and remediation of the site known as "Buick City", between I-475 and Industrial Avenue and Hamilton Avenue to Stewart Avenue. The project is proposed to be purchased by the Guggenheim Trust to be developed into a multi-million dollar Intermodal Transporation Hud for distribution of goods from air to rail to road. The proposed new use would help Flint to become an international port and provide potentially thousands of new jobs. Intermodal Hub Master Plan complete and Brownfield Plan complete. April, 2009

Spring Grove Wetland Restoration

Restore a wetland and a natural spring on a GCLBA owned 4.4 acre tax foreclosed brownfield site adjacent to historic homes, a rails to trails bike path, and very near the Flint River and Downtown Flint. In partnership with the Grand Traverse District Neighborhood Association, the City of Flint, and Stockton Center at Spring Grove, the site will be transformed into an environmental education center, a wetland demonstration, a neighborhood gathering place and community garden. The former brownfield site was remediated using a $200,000 EPA cleanup grant so the site is prepared for restoration. Shrubs have been removed, plans have been developed, and the wetland permitting process is underway. Volunteers will be cleaning and planting the upland area of the site in the spring. The adjacent Stockton Center at Spring Grove is investing in improvements surrounding the site. Additional funding requests are pending to support the restoration efforts. 4/1/2009

D VE $

20,000,000

6/30/2010

$

75,000

The GCLBA is partnering with the the University of Michigan-Flint to retrofit a tax foreclosed property close to campus in the Land Bank’s strategic reinvestment area in downtown Flint into a environmental demonstration house. The renovated house will maximize energy efficiency and introduce sustainable, innovative ways to minimize water use. The UAH will have an educational classroom space on the first floor and residential space oriented to students on the second and third floors. In supporting the revitalization of a downtown neighborhood and expanding the reach of the university, this project also provides the Land Bank, non-profit housing developers, local builders contractors and residents with a model for renovating a dilapidated structure into an environmentally sustainable house. The critical heating and cooling infrastructure for the house includes a geothermal system driven by a horizontal loop in the lot adjacent to the house. $50,00 in funding is requested for the installation of the efficient energy system. 8/1/2009

August, 15 2010

$

592,000

The Manhattan project includes the development of a mixed-income 22 multi-family residential units. The project has been partially completed in 2000, the project stopped and is unable to be completed by the current owner. Since 2000, the building has suffered from vandalism and a lack of property management. The total cost of this project will be $3.7 million to renovate the existing 9 units and complete the remaining 5/1/2009

12/31/2009

$

3,700,000

Energy Efficient Affordable Housing

Retrofit 15 foreclosed homes owned by the GCLBA to make them energy efficient while also affordable. This will stabilize neighborhoods, return foreclosed properties to the tax roll, prevent further decline of neighborhoods, and make housing costs more affordable. Those who invest in these properties will be expected to make an average of $5,000 in investments in additional home improvements. The investment in these properties will increase investments in the surrounding properties. 3/1/2009

3/1/2010

$

300,000

Neighborhood Greening/ Maintenance of foreclosed properties

Remove debris, maintain, board, and clean 300 foreclosed homes to prepare them for sale and prevent further decline. 3/1/2009

3/1/2010

$

500,000

T O

s t s

April, 2010

Funding Request

O R

Route (Infrastructure Only)

P P A

-N

e u

Genesee County Land Bank Authority (GCLBA) Flint

tt i m

Genesee County Land Bank Authority (GCLBA) Flint

Manhattan Place Project

ub

S

Genesee County Land Bank Authority (GCLBA) Genesee County

Genesee County Land Bank Authority (GCLBA) Genesee County

02262009

d e t

Flint Urban Alternatives House

q e R

Submitted Requests - Not Approved

251 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesee County Land Bank Authority (GCLBA) Genesee County

Project Name

Project Description

Start Date

Expected Completion Date

Demolition and Greening on Foreclosed Properties

Demolish GCLBA owned blighted foreclosed homes and prepare the remaining vacant lot for urban gardening by removing brush, using quality soil for fill, and planting the site with a cover crop, a turf alternative or slow growing grass

3/1/2009

3/1/2010

Genesee County Land Bank Authority (GCLBA) Genesee County

Demolition and Greening

Demolish blighted foreclosed homes and prepare the remaining vacant lot for urban gardening by removing brush, using quality soil for fill, and planting the site with a cover crop, a turf alternative or slow growing grass

3/1/2009

3/1/2010

Genesee County medical Society

Tax credits or deductions for physicians caring To increase access to care for Medicaid, Genesee Health Plan, and medically for Medicaid, Genesee Health Plan and indigent patients by allowing physicians to take tax deductions or tax credits for the Medically indigent patients. care they provide patients who fall into these catagories

Funding Request

$

1,500,000

$

1,500,000

9/30/2009

$

100,000

4/1/2009

9/30/2009

$

135,000

4/1/2009

9/30/2009

$

600,000

Genesee County Parks & Recreation Commission Flushing Township - City of Flushing - Thetford Township - Fenton Township - Richfield Township - Oregon Genesee County Parks & Recreation Law Enforcement Training and Professional Development - Critical Incident Genesee County Parks Township - Marathon Commission Park Ranger Division Park Law Management, (Violence in the Workplace, Grappling Techniques, Report Writing, & Recreation Township Enforcement (Act 261 Agency) Enviromental Contamination Response)

4/1/2009

9/30/2009

$

16,000

Genesee County Parks & Recreation Commission Flushing Township - City of Flushing - Thetford Township - Fenton Township - Richfield Township - Oregon Genesee County Parks & Recreation Genesee County Parks Township - Marathon Commission Park Ranger Division Park Law Law Enforcement Equipment - Medical Emergency, Haz-met, crowd-control, anti& Recreation Township Enforcement (Act 261 Agency) terrorist and communications equipment

4/1/2009

9/30/2009

$

106,392

Genesee County Parks & Recreation Commission Flushing Township - City of Flushing - Thetford Township - Fenton Township - Richfield Township - Oregon Genesee County Parks & Recreation Genesee County Parks Township - Marathon Commission Park Ranger Division Park Law Patrol/Law Enforcement Vehicles - (4) Chevrolet Tahoe Special Service Vehicles, & Recreation Township Enforcement (Act 261 Agency) 5W4, 4WD, specially equipped with communication and police implements

4/1/2009

9/30/2009

$

236,000

Genesee County Parks & Genesee County Parks Recreation Commission Genesee Township Huckleberry Railroad Bridge Improvement & Recreation

4/1/2009

9/30/2009

$

135,000

Genesee County

Construction of a Pedestrian Bridge

Construction of a pedestrian bridge to improve mobility and safety along nature trails in the For Mar Nature Preserve and Arboretum 4/1/2009

City of Burton - For Mar Genesee County Parks Nature Preserve and & Recreation Arboretum

Kearsley Creek Bank/Shoreline Stabilization

Bank stabilization to reduce sediment in Kearsley Creek and prevent erosion that threatens the stability of the Merkley Visitors Center

Genesee County Parks Genesee County Parks Richfield Township, & Recreation Oregon Township

Erosion Control

Construction - Assist Genesee County Parks and Recreation Commission with erosion control at Wolverine Campground on Holloway Reservoir.

T O

O R

Immediately

City of Burton - For Mar Genesee County Parks Nature Preserve and & Recreation Arboretum

P P A

none

Route (Infrastructure Only)

D VE

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

Replace piling supports and decking along with crossbeams; tressel/bridge upgrade (Genesee County's largest tourist attraction)

Submitted Requests - Not Approved

252 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Genesee County Parks & Genesee County Parks Recreation Commission & Recreation Genesee Township Huckleberry Railroad Track Improvement

Replace and upgrade four miles of narrow gauge railroad track for Huckleberry Railroad (Genesee County's largest tourist attraction)

4/1/2009

Genesee County Parks & Recreation Commission Genesee County Parks Richfield Township, & Recreation Genesee Township Fishing Piers

Construction - Assist Genesee County Parks and Recreation Commission with construction of 4 fishing piers along the Flint River Trail.

4/1/2009

Genesee County Parks & Recreation Commission Genesee County Parks Richfield Township, & Recreation Genesee Township Boat Launch Improvements

Construction - Assist Genesee County Parks and Recreation Commission with boat launch improvements including replacement of docks to meet ADA standards.

4/1/2009

Genesee County Parks & Recreation Commission Richfield Township, Genesee County Parks Genesee Township - City & Recreation of Flint Public Access Sites

Construction - Assist Genesee County Parks and Recreation with 4 canoe access sites along the Flint River Trail

Genesee County Road Commission Flint Township Genesee County Road Commission Flint Township

Genesee County Road Commission Flint Township Genesee County Road Commission Flint Township

Genesee County Road Commission Flint Township Genesee County Road Flushing & Mt. Morris Commission Township

Genesee County Road Commission Mt. Morris Township

u S

Genesee County Road Commission Mt. Morris Township

Genesee County Road Commission Mt. Morris Township Genesee County Road Commission Mt. Morris Township

02262009

Flushing Road Improvements

Pasadena Avenue Improvements

Flushing Road Improvements

d e t

Pasadena Avenue Improvements

itt

500,000

$

80,000

9/30/2009

$

100,000

4/1/2009

9/30/2009

$

80,000

Construction of a regionally significant non-motorized pathway in Flint Township that connects to a City of Flint section of the Genesee Valley Trail. This project will expand upon and connect to an existing non-motorized trail facility in Flint Township and multimodal transit facilities. 4/1/2009

9/30/2009

$

1,400,000

$

Flushing Road from Linden Road to Mill 1,313,000 Road

$

Pasadena Avenue from I-75 to Flint 1,737,000 City Limits

$

Flushing Road from Linden Road to Mill 1,313,000 Road

Elms Road Improvement

bm

Jennings Road Improvements

Clio Road Improvements

Jennings Road Improvements

Clio Road Improvements

s

st

O N

Concrete pavement repair, mill and HMA resurface

e u

Concrete pavement repair

q e R

Concrete pavement repair, mill and HMA resurface

9/30/2009

Funding Request

Route (Infrastructure Only)

$

A T

Genesee Valley Trail- Flint Township

Expected Completion Date

PP

O R

5/1/2009

5/1/2009

7/1/2009

9/30/2009

11/1/2009

11/1/2009

11/1/2009

D VE

Concrete pavement repair

7/1/2009

11/1/2009

$

Pavement Reconstruction

7/1/2009

11/1/2009

$

Pasadina Avenue from I-75 to Flint 1,737,000 City Limits River Road to 1,063,000 Flushing Road

$

Jennings Road from Pasadena Avenue to Pierson 1,600,000 Road

$

Clio Road from Pierson Road to 1,653,000 Carpenter Road

$

Jennings Road from Pasadena Avenue to Pierson 1,600,000 Road

$

Clio Road from Pierson Road to 1,653,000 Carpenter Road

Concrete pavement repair

Concrete pavement repair

Concrete pavement repair

Concrete pavement repair

Submitted Requests - Not Approved

5/1/2009

5/1/2009

7/1/2009

7/1/2009

11/1/2009

11/1/2009

11/1/2009

11/1/2009

253 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Vienna Twp, Mt. Morris Genesee County Road Twp, Genesee Twp, City Commission of Mt. Morris Genesee County Road Commission Atlas Township Genesee County Road Commission Fenton Township Genesee County Road Commission Fenton Township Genesee County Road Commission Fenton Township Genesee County Road Commission Fenton Township Genesee County Road Commission Fenton Township

Project Name

Project Description

Start Date

Expected Completion Date

Trolley Line Trail

Construction of a multi-jurisdictional, regionally significant non-motorized pathway connecting to existing paths in the four jurisdictions

4/1/2009

9/30/2009

Green Road Bridge

Bridge Replacement

4/1/2010

8/1/2010

Thompson Road

Base Crush & Shape & HMA Resurfacing

4/1/2010

8/1/2010

Ripley Road

Base Crush & Shape & HMA Resurfacing

4/1/2010

8/1/2010

Jennings Road Improvements

Base Crush & Shape & HMA Resurfacing

4/1/2010

North Road

Base Crush & Shape & HMA Resurfacing

Torrey Road

Base Crush & Shape & HMA Resurfacing

4/1/2010

T O

Genesee Early College (GEC) is an intensive, state-of-the-art, five-year high school combining the best elements of the high school and early university experiences. It is designed to prepare underserved students for careers and advanced study in the medical and health professions. The school is operated by the Genesee Intermediate School District and is a fully integrated part of the University of Michigan-Flint community. Students begin dual enrolling in grade 10 and experience relevant and hands-on experiences related to the health-care professions. Students may also earn up to sixty (60) college credits at no cost to their family. GEC serves students in Genesee County and accepts students from neighboring counties as well. Students are identified for this program based on student/family interest, counselor and teacher recommendation, demonstrated academic path, as well as being identified as underserved academically, socially, and/or economically. A one-week summer orientation is required for new students to prepare them for college-level work and to introduce them to the University’s campus, faculty, and resources. Students attend s9/1/2007 Completion of the Inflow / Infiltration Investigations and select improvements to reduce I&I connections. 3/1/2009 Construction of a 12-inch DI watermain from Dort Highway east to Genesee Road, which will complete a northern loop within the Township for Fire Flow and pressure requirements.

9/1/2010

$

Wilson Rd to Flint 6,869,108 River Trail Over Kearsley 625,000 Creek US-23 to Torrey 351,000 Road Rolston Road to 606,000 Lahring Road Lahring Road to 909,000 Thompson Road Lahring Roadto US1,426,000 23 Ramp

9/1/2010

$

Thompson Road to 1,812,000 Fenton City Limits

O R

P P A 4/1/2010

Funding Request

Route (Infrastructure Only)

8/1/2010

$

D VE $

$ $

$

N s

Genesee Intermediate School District Flint

Genesee Early College

Genesee Township

Sanitary Sewer Improvements

Genesee Township

Genesee Township

Genesee Township

Genesee Township

Genesee Township

d e t

Mt. Morris Road Watermain

tt i m

Belsay Road Watermain

b u S Genesys Health Sysem

Grand Blanc

02262009

Genesys Outpatient Imaging Center

t s e

qu

e R

$

969,036

5/1/2010

$

750,000 Various

3/1/2009

11/1/2009

$

2,200,000 Mt. Morris Road

Construction of a 12-inch DI watermain from Richfield Road north to Coldwater Road, including connecting loops at Carpenter Road, Hopkins Road, and 4 subdivision roads. 3/1/2009

11/1/2009

$

2,100,000 Belsay Road

Create a free-standing outpatient diagnostic imaging center on the Genesys Health Park Campus, which would offer radiology, ultrasound, mammography, computed tomography, and MRI services in a setting separate from in-patient services. Currently, out patients and in patients are treated in the same space within the Medica Center, often resulting in “bumping” of outpatients off the schedule or delaying in patient testing. A new out patient imaging center would separate out these two patient populations, resulting in providing care in the most appropriate, cost-effective setting. This center would have integration with the Genesys Regional Medical Center, creating seamless viewing of all diagnostic testing between a patient’s inpatient and out-patient care. This will result in faster diagnosis and treatment delivery thus enhancing health care in this region. This initiative would create at least 60 new, sustainable jobs, consisting of X-ray, ultrasound, mammography, CT and MRI technicians; Radiologists; and several clerical and transcription positions. 1/1/2010

7/1/2011

$

Submitted Requests - Not Approved

10,000,000

254 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Grand Blanc

Project Name

Project Description

Start Date

Genesys Health System Medical Simulation Center

Genesys Health System proposes a new 30,000 square foot state of the art simulation center that would be the first of its kind in mid-Michigan. Simulation is a way to improve the quality of health care delivery by creating safe environments in which to learn, thereby minimizing risks to patients. Genesys will have simulated operating, intensive care, trauma and recovery rooms which will create numerous high tech and support staff jobs. A center of this caliber will bring cutting edge team-based learning opportunities to a full spectrum of diverse students including Nursing, EMS, Surgical Tech, Medical students, residents, military personal and attending physicians. With strong partnerships with Kettering University, University of Michigan, Baker Collage, Mott Community Collage and Michigan State University, Genesys will bring innovative research endeavors to the area. It will be a destination for medical technology companies such as: Ethicon, Covidian and Stryker, who need regional training centers to educate their employees and clients. Through the influx of out of area users of this facility, we will see a direct positive impact our local economy. This will directly create ASAP

National Help Desk Located in Genesee County

Ascension Health is looking for a location to house a national help desk to support some or all of its 27 health systems. This help desk would provide up to 90 new technology jobs that would suport the Ascension Health hospitals 24 hours a day. The technology specialists that would answer the phones at this help desk would provide technical support for clinical applications across Ascension Health. Help desk are often used as entry points for college graduates into the healthcare information technology industry. This help desk would be sustained over time by payments from the Ascension Health hospitals across the country for support calls.

A T

Genesys Health System

Grand Blanc, MI

s

t s e

Expected Completion Date

O N

O R

PP

6/1/2009

Project Description: Human Resources and payroll systems would be upgraded to allow employees to view and update their personal information on-line from a remote secured platform and from within the hospital. Managers would be able to view and update HR transactions (pay and hour changes; employment status, etc.) on-line both from a secured remote platform and from within the hospital. New hires would be able to complete all paperwork and review standard materials prior to their start date from a remote secure platform . Integration programs would link the requisition technology to the application technology and then to the HR/payroll technology for new hires. Online technology would be added to conduct new hire skills based testing to access ability to meet job requirements; identify opportunities for skill development and “best match for positions/units”. Scanning for on-line personnel record retention would HR On-line Personnel Record, Recruiting and include 5 years of history for active employees and the most recent two years of terminations. June, 2009 On-Boarding Systems

Funding Request

Route (Infrastructure Only)

D VE

2011

$

1,400,000

6/1/2010

$

3,000,000

The project completion date for the Flint work will be June 2010 and for the first phase of the new sites will be September 2010. We anticipate the work in the new sites continuing beyond that time frame. $

2,450,000

u q e

t i m

b u S Genesys Health System

R d

e t t

Genesys Health System

Flint

02262009

Enterprising Health

Enterprising Health is an innovative program that works with grassroots populations to develop entrepreneurial businesses that improve health. The project follows a business creation process originally created to help companies serve those struggling economically in developing countries and has been used successfully in Kenya, India and Mexico. It is currently being adapted for use in the US, focusing on health care. Out of 22 potential locations, Flint was chosen as the pilot site for the US based work, which is currently being sponsored by Ascension Health. A group of 20 individuals from diverse backgrounds has come together over the last four months to co-create business ideas and become business owners. The goal is to create sustainable businesses that will not only be owned by those most in need, but will also improve The project was health, provide jobs, and bring additional revenue to local communities. Because started in June there is an expectation that the businesses are self-sustaining once they are 2008 in Flint and established, the process provides a way to continue to create jobs and stimulate the is continuing to local economy without relying on grants, fundraisers and other methods that are typicamove forward.

Submitted Requests - Not Approved

6/1/2010

255 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Flint

Project Name

Project Description

Start Date

Expected Completion Date

Genesys Care Management Center

The Genesys Care Management Center is a centralized call center/resource designed to help patients and families navigate the complexities of the healthcare process. A virtual extension of the medical home to support the growing number of un insured and underinsured who need access to healthcare advice and help, the center improves the health of our community with accurate and timely medical information.The Call Center service area is Mid-Michigan, with approximately 300,000 patients and families. The Call Center, located in Flint, is a 24/7/365 accepts incoming patient health questions and concerns. The Center will be staffed by phone response line nurses. The nurses will have immediate access and reference to physician specific calls, as well as evidence based software to support triage and decision making for patients determining whether or not they need or should seek medical care. As access to healthcare is increasingly limited, this community wide service can translate into reduced utilization through appropriate response and referral. Services will include:Post hospitalization follow up calls; April, 2009

Transportation and Distribution Hub

Genesee County and Flint are strategically and geographically positioned at the hub o multiple modes of transportation including: Rail, Freeway (I75, US23 & I69) as well as being the location of Bishop International Airport. In this unique setting, established through the demanding delivery and distribution needs of the automobile industry, Genesys Health System proposes the development of a distribution and supply chain hub to serve Genesee County, the State of Michigan and also international commerce between the USA, Canada and potentially other foreign outliers. Currently the US and Canada enjoy one of the largest and longest business relationships in world history. Flint and Genesee County are uniquely positioned at the transition point of the three main modes of transportation, and hence, propose investing $30 - 50 million to develop a supply chain hub in this region. Areas of utilization would include medical supply and distribution, biomedical, educational and traditional automotive supply and distribution. Core competencies developed would include supply chain research methodology, enhanced and refined over- road, rail, and air transportation, warehousi

P P A

O R

Funding Request

D VE

June, 2011

$

6,400,000

2011

$

50,000,000

School at Work is the premier career development system for entry-level workers in the healthcare industry. School at Work is a proven tool to grow your own workforce, providing education and encouraging career advancement. School at Work is a bridge program that prepares employees for better-paying jobs and for entrance to local community colleges. Genesys will implement the School at Work program to create a career lattice to support the existing Workforce development programs in our County. ASAP

7/1/2009

$

50,000

The Genesys Learning Institute will develop a tutoring center to provide educational and training support to any person enrolled in a healthcare career curriculum. Students in our community today face a variety of social, economic, psycho-social, cultural and academic challenges that result in discouraged students, high attrition rates, delayed graduation and students who may be unprepared for the rigors of a healthcare career. Through a tutoring program, Genesys will match students with professionals working in or retired from their chosen field, to gain first hand experience and educational support, and identify social and cultural issues that can be referred fo the appropriate professional support. Senior citizens are ideal tutors, and may be engaged as volunteer tutors, leading to the sustainability of the program. This program was piloted with nursing students, and resulted in a 20% drop in attrition and an increase of 45+ nurses entering the field each year. ASAP

2011

$

500,000

T O

Route (Infrastructure Only)

N s

Genesys Health System

Genesys Health System

Genesee County

Grand Blanc

School At Work

d e tt

t i m

b u S Genesys Health System

Grand Blanc

02262009

Health Care Education Tutoring Center

t s e

qu

e R

Submitted Requests - Not Approved

256 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Project Name

Project Description

Start Date

The Home Health Telemedicine Project would extend certified home health care services with telemedicine support to both rural and urban areas of Genesee, Saginaw, Lapeer, Livingston, Tuscola, Huron and Oakland counties. Certified home health agencies provide skilled nursing, home health aides, physical therapists, occupational therapists and speech therapists services in the home under the guidance of a physician. Telemedicine allows the home health agency to monitor and report the patient’s physical status to the physician before an acute, more costly medical intervention is required. Telemedicine monitoring includes the measurement of physiologic parameters such as weight, blood pressure, pulse, and oxygenation. In addition, a disease specific patient profile and assessment is performed by a registered nurse trained in telemedicine monitoring. Abnormal values or trends are communicated to the physician immediately. Physiologic trends are communicated to the physician at least weekly. When abnormal trends Immediately

Home Health Telemedicine

Grand Blanc

Through a collaborative effort with Mott Community College, UM Flint, and the other two health systems, we will increase the number of graduating RN's to meet the RN workforce shortage both current and anticipated. We will accomplish this in 3 parts. Part 1: Increase the number of nursing faculty to allow expansion of the current nursing education programs - through engaging current nurses in tutoring and metoring nursing students, we introduce them to academia, and stimulate their interest in pursuing additional credentials to qualify them to become faculty at the nursing schools. Part 2: Nurse tutors and mentors support current nursing students Expanding the capacity of nursing instruction to be successful through educational, clinical and psycho-social support during their and accelerating the entry of nurses into the education program. This reduces attrition, increased on-time graduation and first time workforce in Genesee county NCLEX success. Part 3. Focus on ASAP

Genesys Health System

Grand Blanc, MI

e u

t i m

d e tt

Long-Term Care Information Technology

N s

st

Care Tracker is a unique data collection/reporting system for long-term care organizations, this integrated system effectively manages operations, improves the quality of resident care and supplements our MDS system in ways that improve MDS accuracy and maximize reimbursement. Care Tracker electronically delivers information to our other flexible data collection system without having to replace our MDS, Billing, Payroll and Other Software Systems. Care tracker will help ensure residents receive proper services by warning nurses and managers of situations such as dehydration, constipation, or any other condition that needs immediate attention. It allows management to proactively identify and care plan to avoid events that may result in negative residents quality outcomes. Because information recorded is more detailed and complete, reimbursement will be more accurately tied to the services actually received by the resident. Care Tracker records the date, time, and staff member on each observation for 100% accountability. Any data that is changed in the computer is logged for a complete audit trail including the ID number of the staff memb5/1/2009

q e R

O R

P P A

Grand Blanc

T O

Genesys Health System

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE $

500,000

2011

$

1,500,000

9/1/2009

$

200,000

b u S 02262009

Submitted Requests - Not Approved

257 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Grand Blanc, MI

Project Name

Project Description

Start Date

Healthcare Decision Support System

Decision Support is a tool used to provide analysis, research and quantitative support primarily to service industries such as health care. Genesys Health System lacks a decision support system. The current trend within the healthcare industry has been and continues to be decision support systems. Fueled by mergers, alliances, business "partnerships", etc. as well as pressures placed on the healthcare industry from payment cutbacks by payers such as Medicare, Medicaid and others has made critica the need to improve operations and maintain high levels of patient care. In order to produce accurate standardized information for comparative analysis, healthcare entities are being forced to consider new technology that embraces and delivers standard decision support /executive information systems solutions. A decision support system would allow us to anticipate the clinical and financial information needs of healthcare professionals across all disciplines in order to support enhanced decision-making which would be beneficial to both patients and caregivers. Decision support would provide accurate, methodical and consistent answers to clinical questio 5/1/2009

Web Access To Patient Records

A patient's medical record is currently spead across many points of the continuim of care. Many parts of a patient record are maintained by health systems, while other parts are stored electronically by primary care providers. A patient portal would allow a patient to go online to access a single consolidated view of their patient record. The portal would have the ablity to reach out to both the health system and primary care data bases to present a single consolidated view of a patient's record. This patient portal would also allow this data to be share via a RHIO or HIE so that other health care system could share informaton on a patient. Genesys health system has been looking at a patient portal for over 12 months as part of the population based care HealthWorks model. This patient portal could tie together the many primary care doctors that refer to Genesys Health System within a 18 month time frame. 5/1/2009

T O

Genesys Health System

Grand Blanc, MI

Expected Completion Date

P P A

N s

t s e

O R

Funding Request

Route (Infrastructure Only)

D VE

12/1/2009

$

650,000

12/1/2009

$

1,100,000

3/1/2010

$

2,500,000

u q e

Genesys Health System proposes to create a unified data repository coupled with patient management tools for all patients and related information originating across the continuum of care. This would be a proof point for a commercially viable interoperable data exchange linking data from Hospitals, Physician Offices, Clinics, Ambulatory Diagnostic and Treatment Centers, Home Health, and most important – patients and their support structure. The fundamental test of success will be the ability for a patient’s data to be available in the proper context at any time or place care is delivered. This will be a new generation of enabling tool that optimizes the capabilities and benefits of a medical home and functionally be the virtual component of that home. This project would be built in conjunction with software partners utilizing existing products to minimize the time for deployment. Additionally, such an effort would be done in concert with major portal partners in order to most effectively deploy access in a rapid fashion to the broader community. This project with create 12 new jobs within the Information Technology space supporting Health Care. It is highly likel 5/1/2009

R d

Genesys Health System

Grand Blanc, MI

i m

Patient Centered Medical Home

b u S 02262009

e t tt

Submitted Requests - Not Approved

258 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Project Name

Project Description

Start Date

Grand Blanc, MI

Current printer does not print labels for component parts of whole blood, meaning blood products will not be correctly labeled in the format required by the American Association of Blood Bank or the Joint Commission. Failure to comply may result in shutting down our Blood Bank, eliminating our ability to provide blood transfusions at the Medical Center. This will, in turn, force ambulance diversions away from our Emergency Room for any patient that may need a blood transfusion. Similarly, admissions would have to be denied to any patient with even a remote chance of requiring a blood transfusion while an in patient at Genesys. Besides the 6 Laboratory Medical Technologists who work in the Blood Bank and would be directly affected with a job loss, the Emergency Department diversions and limited in patient admissions would cause significant work force reductions across the entire spectrum of employees, potentially involving hundreds of nurses, respiratory therapists, Laboratory ISBT Printer for Blood Component pharmacists, physical therapists, radiology technicians, food service employees, housekeepers, etc. 4/1/2009 Labeling

Grand Blanc, MI

10,000

Replace our current electrocardiogram (ECG) system with a new system that will interpret, edit, and bill our 110 daily ECGs here at Genesys Regional Medical Center. This system will also store all past and future ECG tracings, allowing physicians to quickly retrieve and compare medical information to assist with rapid, accurate diagnosis of conditions. Additionally, new system would automate all billing functions for ECGs whereas today, some billing functions are still manual. Our existing system is 13 years old, obsolete, and no longer supported by the vendor (vendor support expired 12-31-08). If the system fails, we lose all ability to download recorded heart rhythm tracings, as well as the ability to automatically bill for ECG services on 110 daily ECGs (would require reverting to an entirely manual billing system). Loss of the service would force us to limit admissions and divert ambulances from our Emergency Department, which in turn would result in significant work force reductions across the entire spectrum of employees, potentially involving hundreds of nurses, respiratory and physical therapists, pharmacists, radiology techni 4/1/2009

6/30/2009

$

450,000

The Home Health Telemedicine Project would extend certified home health care services with telemedicine support to both rural and urban areas of Genesee, Saginaw, Lapeer, Livingston, Tuscola, Huron and Oakland counties. Certified home health agencies provide skilled nursing, home health aides, physical therapists, occupational therapists and speech therapists services in the home under the guidance of a physician. Telemedicine allows the home health agency to monitor and report the patient’s physical status to the physician before an acute, more costly medical intervention is required. Telemedicine monitoring includes the measurement of physiologic parameters such as weight, blood pressure, pulse, and oxygenation. In addition, a disease specific patient profile and assessment is performed by a registered nurse trained in telemedicine monitoring. Abnormal values or trends are communicated to the physician immediately. Physiologic trends are communicated to the physician at least weekly. When abnormal trends are identified or treatment plans modified, a home health nurse is dispatched to the patient’s home for implemen 4/1/2009

11/1/2009

$

500,000

t s e

Route (Infrastructure Only)

D VE $

s

ECG Tracemaster

PP

O R

Funding Request

5/1/2009

A T

Genesys Health System

Expected Completion Date

O N

u q e

R d

Genesys Health System

Grand Blanc, MI

ub

i m

e t tt

Promoting Telemedicine In Genesee County

S 02262009

Submitted Requests - Not Approved

259 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Genesys Health System

Project Name

Project Description

Grand Blanc, MI

Replace all 38 patient monitoring systems in each of the ED rooms. These monitors display, record, and report all vital signs---heart rate, blood pressure, cardiac output, temperature, level of oxygen in the blood stream, diagnostic/interpretive quality electrocardiogram (12 lead ECG). The current system is not now fully supported by Philips and there exist only a limited number of replacement parts from the manufacturer. Once parts are no longer available, the monitor would not function, requiring that we close the particular ED treatment room serviced by that monitor. Obviously, this would limit our capacity and throughput in the Emergency Department and delay and/or deny life saving care. Sixty percent of Genesys’ admissions come through our Emergency Department. A lack of these monitors would cripple not only our Emergency Department, but our entire Medical Center, resulting in workforce Philips Emergency Department Heart Monitors reductions across our entire spectrum of employees. 4/1/2009

Grand Blanc, MI

900,000

Digital Medical Imaging

Digital medical imaging uses a picture archiving and communication systems (PACS) storage, retrieve, distribute, and present medical images. The PACS system at Genesys currently can handle images from various medical imaging instruments, including ultrasound, magnetic resonance, PET, endoscopy, and mammograms. Genesys would like to expand the current PACS capablity to include other areas like cardiology. The expansion of the current PACS capablity would have a significant impact on patient saftey. 4/1/2009

9/1/2009

$

1,520,000

Philips Telemetry Monitoring System for Cardiovascular and Telemetry Units at Genesys

Philips Medical Telemetry System is a wireless patient monitoring of heart rate, rhythm, and the level of oxygen in the bloodstream. This wireless, IT capability constantly tracks this medical data while allowing the patient to move about freely in their hospital bed, or even get up and move about in their room, without getting tangled up in wires and lines. The computer system that drives this telemetry system for our cardiovascular and telemetry units is obsolete at Genesys, with Philips no longer able to support the technology because it is so old. If the system goes down, it is highly unlikely a repair could be achieved, and we would lose the ability to monitor patients in 80 beds, thus effectively closing those beds. This would result in ambulance diversions and the inability to admit patients to Genesys. A reduction of 80 of our 410 beds, plus the loss of patients associated with ambulance diversions, would cause significant work force reductions across the entire spectrum of employees, potentially involving hundreds of nurses, respiratory therapists, pharmacists, physical therapists, radiology technicians, food service employees, hous 4/1/2009

6/1/2009

$

2,000,000

Replace our current IV Pumps with Smart Pumps, an infusion pump also capable of accessing patient specific drug dosage information from a Pharmacy database which would prevent/eliminate medication errors delivered to patients. Specifically, the system allows bar code scanning of three items: • patient’s identification bracelet • physician’s order for the drug to be administered • the bar code on the drug itself The system then matches all three pieces of information to ensure the right drug is delivered to the right patient in the right dose. If all components don’t match, the IV pump will not administer the drug to the patient. Our existing IV pumps, which are not Smart Pumps, are comprised of a discontinued model and cannot be replaced. If we are unable to replace our existing pumps with Smart Pumps, this will impact our ability to admit and care for patients, which in turn, would result in work force reductions across all spectrums of job classes. 4/1/2009

10/1/2009

$

2,500,000

s

b u S Grand Blanc, MI

02262009

u q e

R d

e t tt

i m

Genesys Health System

O N

Conversion of IV Pumps to Smart Pumps

Route (Infrastructure Only)

D VE $

A T

Grand Blanc, MI

PP

O R

Funding Request

6/1/2009

t s e

Genesys Health System

Start Date

Expected Completion Date

Submitted Requests - Not Approved

260 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Project Name

Project Description

Start Date

Grand Blanc, MI

Human Resources and payroll systems would be upgraded to allow employees to view and update their personal information on-line from a remote secured platform and from within the hospital. Managers would be able to view and update HR transactions (pay and hour changes; employment status, etc.) on-line both from a secured remote platform and from within the hospital. New hires would be able to complete all paperwork and review standard materials prior to their start date from a remote secure platform . Integration programs would link the requisition technology to the application technology and then to the HR/payroll technology for new hires. Online technology would be added to conduct new hire skills based testing to access ability to meet job requirements; identify opportunities for skill development and “best match for positions/units”. Scanning for on-line personnel record retention would HR on-line personnel record, recruiting and on include 5 years of history for active employees and the most recent two years of terminations. 4/1/2009 boarding systems

Grand Blanc, MI

Giving medications safely is a key component of improving patient care. The accuracy standard is expressed as “The Five Rights of Medication Safety,” that is, Right Patient, Right Drug, Right Dose, Right Route, Right Time. Technology can enable caregivers to perform their tasks at levels of effectiveness that are otherwise impossible to achieve. By implementing all phases of a new Pharmacy system at Genesys, a closed loop medicaton administration process can be implemented, which will help ensure the five rights of medication saftey are met. Genesys started the Pharmacy system implementation in 2008, but due to difficult economic conditions the project was put on hold. Resuming the project could take place immediately. With the appropriate funding the project can be completed within two years. The savings associated with manual tracking of medication would be used to sustain this pharmacy system over time. 4/1/2009

T O

Genesys Health System

Closed Loop Medication Administration

Expected Completion Date

P P A

N s

t s e

O R

Funding Request

Route (Infrastructure Only)

D VE

6/1/2010

$

2,700,000

9/1/2010

$

3,817,000

9/1/2010

$

6,760,000

u q e

Computerized physician order entry (CPOE), is a process of electronic entry of physician instructions for the treatment of patients. These orders are communicated over a computer network to the medical staff (nurses, therapists, pharmacists, or other physicians) or to the departments (pharmacy, laboratory or radiology) responsible for fulfilling the order. CPOE decreases delay in order completion, reduces errors related to handwriting or transcription, allows order entry at point-ofcare, provides error-checking for duplicate or incorrect doses or tests, and simplifies inventory and posting of charges. Implementation of CPOE at Genesys Health System would create or perserve over 35 jobs. Although Genesys has not begun the implementation of CPOE, planning toward implementing CPOE began in 2001. The CPOE work could begin immediately with implementation finishing within six months o completing the EMR. Eliminating paper and verbal orders would not only improve patient saftey, it would lower costs associated with current manual procedures. These savings could be used to help sustain the CPOE systems going forward. 4/1/2009

R d

Genesys Health System

02262009

i m

b u S

Grand Blanc, MI

e t tt

Computerized Physician Order Entry

Submitted Requests - Not Approved

261 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Grand Blanc, MI

Project Name

Project Description

Start Date

Replacement of 3 Cardiac Catheterization Labs

Fully re-outfit all 3 of the Genesys Cath Labs into state-of-the-art labs, including full fluoroscopy and electrophysiology capabilities in each. Our current cath labs possess varying capabilities in each of the three rooms, limiting throughput and the number of cases that can be completed. Our technology is frail and out-dated. Reoutfitting all three in an up-dated, standardized fashion would increase capacity and improve throughput, allowing more life saving procedures to be performed. Over 30 Registered Nurses, Cath Lab Technicians, managers, schedulers, Medical Records personnel, clerks, etc. are required to keep the Cath Labs running. There are 28 Credentialed Cardiologists at Genesys. Failure to maintain state-of-the-art Cath Labs will eventually result in a loss of all of these jobs. 4/1/2009

Electronic Medical Record (EMR)

Genesys Health System began the implementation of an electronic medical record back in 2001. Many components of the electronic medical record are now in place, but due to difficult economic conditions the progress toward a complete EMR across the entire health system has been put on hold over the past 18 months. To complete the implementation of the EMR across the health system, new systems like an Emergency Department system, Physcian Documentation, OB system, and ambulatory EMR would need to be purchased and implemented. Completing the EMR at Genesys will create or preserve over 30 jobs. Because Genesys had been working on the EMR since 2001, this projects is immediately "shovel ready". A completely implemented EMR not only will significantly improve patient saftey, it will eliminate the time consuming paper records and lower patient care costs for the health system. The lower aministrative costs will more than offset the cost of maintaining these healthcare information systems going forward. 2001

Grand Blanc, MI

d e tt

t i m

Genesys Health System

02262009

b u S `````

O R

Funding Request

$

7,500,000

9/1/2010

$

14,064,400

Current funding expires 5/31/2009. Because the One The need for a single entry point for homeless services has been recognized by Stop is currently homeless service providers and the homeless as an efficient system to meet the operational the needs of the homeless and those at risk of becoming homeless. This population often doesn’t know where to go or has to go from agency to agency before they get help; additional funding some may give up without ever being helped. In Genesee County, Twelve non-profit Currently would allow for agencies partnered to implement the One Stop Housing Resource Center which operational. little or no provides comprehensive housing placement and supportive services to people who Funding for the disruption in are homeless, at risk of becoming homeless, or have special needs. The homeless One Stop Housing service delivery. and near homeless can access housing and receive assistance in securing medical Resource was a Additional phases care, mainstream resources, counseling, employment counseling and other services one year grant (construction to ensure long-term housing placement. Partners include Health Access/Genesys from the Michigan and/or Health System, Metro Housing, GCCARD, Legal Services of Eastern Michigan, State Housing renovations) of the Carriage Town Mission, Resource Center, Community Mental Health, Shelter of Flint, Development project would be Department of Human Services, Genesee County Youth Corporation, Hamilton CommAuthority which completed wi $

4,110,000

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

Route (Infrastructure Only)

D VE

9/30/2009

T O

Genesys Health System

Expected Completion Date

262 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

expires 5/31/2009. Additional funding was also secured from the United Way of Genesee County. We are currently Kitchen and Intake, Assessment .and Referral Center. Funding this project would searching for enable the Center to continue and expand services by purchasing a building and land; sustainable renovate and build emergency shelter beds; expand operations to 5 days a week; funding to provide cla continue the work.

O R

Genesys Health System

Enterprising Health

T O

Funding Request

Route (Infrastructure Only)

D VE

P P A

Genesys Health System

are identified or treatment plans modified, a home health nurse is dispatched to the patient’s home for implementation of the treatment and/or monitoring. Diseases most commonly seen in the identified counties are diabetes, congestive heart failure (CHF), and chronic obstructive pulmonary disease (COPD). The use of telemedicine monitoring allows the physician access to critical, time sensitive medical information and reports that allows early intervention and treatment to patients who are most at risk. The ability to monitor the patient in the home environment offers critical information to the physician that can prevent a further deterioration of the patient’s condition that can result in a costly hospital admission.

Genesys Health System

Adult day care services provide a comprehensive, structured environment in a protective setting to help older adults and people with disabilities live at home and postpone or avoid nursing home or assisted living care. Genesee County officials have projected that approximately 200 seniors in our area need adult day care services. Our current location has a space capacity to provide service for up to 80 clients per day. However, current funding sources (Community Mental Health, Valley Area Agency on Aging, United Way, and the Genesee County Sr. Millage ) only provide the Center with enough funding to service 40 to 50 seniors per day. This two phase project would require the initial funding to equip, add staff and provide additional transportation at our current location in order to meet the needs of up to 80 seniors. We are also seeking the funding to equip, staff and add the transportation services necessary to start a second location, housed in a proposed Geriatric Services Center which will be located near the health system flagship, Genesys Regional Medical Center.

N s

t s e

u q e

Genesee County

Grand Blanc

02262009

R d

e t tt

Adult Day Care Project

i m

b u S Genesys Health System

Expected Completion Date

Genesys Continuing Care Retirement Community (CCRC)

May/June 2009 for current location; August/Septembe r 2009 for expansion

This project would create an affordable green designed retirement community for medium to low income seniors with services including independent living, assisted living and skilled nursing care which would provide seniors the opportunity to age in place. This project would create the possibility of moving seniors who would normally remain in a more expensive health care setting, to a safe environment which will ensure their actual needs are met. A CCRC of this nature would create over 100 sustainable new jobs in our community utilizing professional, skilled and unskilled staff. Located near the health system’s flagship Genesys Regional Medical Center, the services offered by this new CCRC would also be integrated with a full line of othe senior services located nearby on the same campus. 9/1/2009

Submitted Requests - Not Approved

November 2009 for current location;Septembe r 2011 for expansion $

9/1/2011

$

1,300,000

10,000,000

263 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Grand Blanc

Project Name

Project Description

Start Date

Geriatric Services Center

This project would create a center, technologically integrated throughout the health system, that would house a variety of accessible senior services such as adult day care services, senior/patient transportation services, a senior medical clinic with geriatric specialists and geriatric assessment expertise, a geriatric medical care navigation service, podiatry, dental, optical and durable medical equipment services, outpatient senior rehabilitation services, outpatient pharmacy, satellite laboratory and other diagnostics services, a senior media and conference learning center with community meeting space for senior support groups and activities. It is estimated a project of this nature would create approximately 50 sustainable new jobs in our community utilizing professional, skilled and unskilled staff. The Geriatric Services Center will be located near the health system’s flagship Genesys Regional Medical Center, the services offered by this new service center would also be integrated with a full line of other senior services located nearby on the same campus. 9/1/2009

Genesys Convalescent Center Replacement

This project would replace an inefficient, aging, 40 year old nursing home with a stateof-the-art green facility that has fully integrated healthcare information technology that will be designed to meet the increased medical acuity and psycho-social needs of our 21st century senior population who are seeking effective rehabilitative and chronic care services. The new facility would include sub-acute / transitional care capabilities, skilled care and licensed residential hospice care which would make possible the seamless integration of care paths for seniors moving from the acute care environment into an appropriate more cost-effective long-term-care environment (LTC). This project would sustain approximately 200 full and part-time jobs while creating the need for additional, higher paying nursing positions to manage the higher acuity of seniors being cared for in this new environment. Located near the health system’s flagship Genesys Regional Medical Center, the services offered by this new facility would also be integrated with a full line of other senior services 9/1/2009

Grand Blanc

PP

O R

Funding Request

$

10,000,000

9/1/2011

$

24,000,000

Genesee County is lacking a coordinated approach to cancer care with “one stop” shopping. The population is aging; cancer is a chronic condition and a disease of the aging. Michigan has one of the highest instances of cancer in the nation; with Genesee County one of the highest in the state. Currently, patients are traveling place to place within a system as well as out of the area to receive the cancer care they need. Creation of a cancer center will provide one point of reference for this patient population. It will also provide immediate jobs in construction as well as sustainable healthcare jobs. 2009

2011

$

37,600,000

Each day, the Center for Gerontology receives calls from older adults requesting rides for medical appointments. Many times, these individuals do not understand what the appointments are for and have no one to navigate through the medical system for them or to help ensure compliancy with the medical recommendations of their physician. Through the use of medical care navigators to coordinate the older adult’s medical services and follow up on compliancy, the older adult’s health status should improve, there should be reduction in emergency room usage and hospital admissions creating efficiencies in utilization of medical services. This service would be provided as part of a geriatric clinic. Currently, there is only 1 geriatric clinic in county. Under the direction of a board certified geriatrician, medical care navigation could be provided if funding were available. This would require funding for facility, equipment, 1.0 board certified geriatrician, 1.0 FTE nurse supervisor, 5.0 FTE RNs, 10.0 FTE August/ companion aides and 1.0 FTE intake specialist, equipment/furniture. The program September 09

Ongoing

$

750,000

s

t s e

Route (Infrastructure Only)

D VE

9/1/2009

A T

Genesys Health System

Expected Completion Date

O N

u q e

Genesys Health System

Grand Blanc

R d

e t tt

Genesys Cancer Center

i m

b u S Genesys Health System

Flint

02262009

Geriatric Medical Care Navigator Service

Submitted Requests - Not Approved

264 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Genesee County

Project Name

Project Description

Start Date

Genesys Convalescent Center Direct Dining

In order to meet our resident’s psycho-social needs and nutritional needs, we are proposing to purchase the equipment necessary to implement a “Direct Dining” project. This project creates a restaurant style atmosphere for resident’s to select and eat their meals. Direct Dining allows the resident to make their meal selection at the time of service. It also provides the resident with more choices, and encourages them to eat their meals in the dining room increasing their opportunity for social interaction. Increasing social interaction enhances overall health and well being. Direct Dining also improves the quality of the food by eliminating the holding and transporting of meals. Implementing direct dining will de-institutionalize and provide for a more homelike environment for our residents.Our resident council and resident surveys have pointed out our residents want greater choice and a better service model. Enhancing the dining experience will help us meet our resident’s psycho-social needs and maintain regulatory compliance. 5/1/2009

Senior Transport

Providing door to door transportation for older adults to adult day care, medical appointments, specialist appointments, grocery shopping, governmental agencies is a very valuable service for older adults. Many older adults do not drive, do not have funds to purchase an automobile, and have no support system to get to and from medical appointments which can potentially help them maintain their health and independence. Our Center for Gerontology receives several calls daily requesting miscellaneous senior transportation services but due to resource limitations, we are unable to meet the transportation demand. This project would create approximately 6.0 FTE positions including an intake specialist and drivers. The project would also include an electronic scheduling system, 5 handicap accessible vans and transportation costs. Program would be housed in a Geriatric Services Center will be located near the health system flagship Genesys Regional Medical Center. The Adult Day Care Services would also be integrated with a full line of other senior services located nearby on the same campus. May/June 2009

Ongoing

Genesys Regional Medical Center in Grand Blanc is proposing development of a Level IIB Special Care Nursery (SCN) as a means of enhancing its overall obstetric services to meet the need for safer obstetrics care in our region. U.S. Census projections indicate a rising national birth rate over the next several years. This rise is projected to continue over the next decade, translating into growing demand within hospital obstetrical units. High-risk pregnancies and deliveries are also escalating. A major driving factor is advanced maternal age. Other factors include a greater number of multiple births due to fertility treatment, rising obesity rates, and the increasing lack of health insurance by women of childbearing age. Development of this new program will provide Genesee County with additional construction jobs, as well as the addition of “long term” jobs including: nursing, physician, respiratory and “other” healthcare jobs. The physical plant construction will support job growth and development of new and essential services. ASAP

2009-2010

A T

Genesys Health System

s

Genesee County

Expected Completion Date

t s e

PP

O R 8/1/2009

Funding Request

Route (Infrastructure Only)

D VE $

100,000

$

3,000,000

O N

u q e

R d

Genesys Health System

02262009

i m

b u S

Grand Blanc

e t tt

Level IIB Special Care Nursery (SCN)

Submitted Requests - Not Approved

265 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesys Health System

Grand Blanc

Project Name

Project Description

Start Date

As part of the Genesys Health System’s integrated strategic plan, Genesys intends to build a new Genesys Learning Institute to house and promote numerous programs either existing or in development within its service area. We anticipate the total cost of this new facility to be at or about $45 million. Housed within this facility will be numerous departments including: Medical Research Center, Graduate Medical Education, Genesys Learning Programs, Community Health Education, Nursing Education, Health Care Careers Stimulus Programs, Condon Lecture Series, Medical Scholarship Programs, Surgical Training Services, and others. This proposed facility will be an economic driver for the entire community, first through construction jobs and then through development and dissemination of new research, technology, education and healthcare delivery on a local, national, and international level. Additionally, development of the Genesys Learning Institute will provide community space for Genesys Learning Institute/ Genesys Institute symposia, physician education programs, classroom and lecture space, as well as a community meeting areas. This new facility will ASAP for Health & Well Being:

T O

P P A

O R

Dispensary of Hope is an efficient system to handle the high volume of prescription drugs it dispenses each year. Physicians’ offices, distributors, and manufacturers send their donated medications and excess inventory to the program’s distribution center, which receives prescription requests from the dispensing partners and forwards the medications as needed. The Dispensary’s purpose is to meet short and long term pharmaceutical needs by collecting and distributing unused sample medications and through prescription assistance at a local dispensing site. This is a new service being proposed by Genesys Health System/Health Access to improve access to necessary medications. It is estimated there are 60,000 individuals in Genesee County without any health insurance. The number without prescription drug coverage is higher, as the 60,000 does not include senior citizens on Medicare who have not signed up for Plan D and those with health insurance that do not have prescription drug coverage. 5/1/2009

Funding Request

Route (Infrastructure Only)

D VE

2011

$

45,000,000

9/1/2009

$

677,800

Ongoing

$

850,000

October '10

$

5,000,000

N s

Genesys Health System

t s e

u q e

Dispensary of Hope

Genesys Health System in partnership with Genesee Health Plan Genesee County Georgetown Charter Township Georgetown Township

High Pressure System Improvements

Expansion and full deployment of existing evidence-based Health Navigator (HN) program for the underserved in Genesee Health Plan. HN program supports patients and providers in self management support for prevention and chronic disease, and links to community and public health services. Funds to be used to hire, train and deploy Health Navigators with diverse backgrounds ranging from health educators, to social work to nurses. Plan for 15 HNs to support 30,000 patients. Immediate Construct Pump Station, 1,000,000 gallon water storage tank, and 4.5 miles of watermain September '09

Georgetown Township Georgetown Twp

Pump Station and 3 miles pipe

Pump Station and 3 miles pipe

Gerald R. Ford International Airport

Expected Completion Date

u S

Cascade Twp/Kent County

02262009

R d

Health Navigators for the Underserved

bm

it

e t t

2009

2010

Yes

Taxiway 'Z' Reconstruction - The current pavement condition index rating of this taxiway is Poor. This taxiway serves major corporate tenants on the airfield, including Amway and the Kent Intermediate School District's aviation program. Daily activity on the taxiway includes business class jets. This project will provide improved access to vacant property allowing for improved development potential resulting in future job creation. The design engineer has been selected and contract approval is underway. Environmental approval for the project has been received.

Submitted Requests - Not Approved

266 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Gerald R. Ford International Airport Gerald R. Ford International Airport

Gerald R. Ford International Airport

Gerald R. Ford International Airport

Project Name

Project Description

In-Line Baggage System - This project will replace the existing bag screening devices with newer more efficient units, and relocate them out of the terminal lobby. Current screening units were installed in 2002, making Gerald R. Ford International Airport(GFIA) the first airport in the country to have 100% checked baggage screening. TSA used lessons learned at GFIA to improve screening operations throughout the country. Screening units continue to occupy space in our ticketing lobby, creating long lines at ticket counters leading to more confusion for our passengers. Preliminary design is underway in cooperation with TSA. September, 2009 July, 2010

Grand Rapids/Kent County Kent County

Start Date

Expected Completion Date

O R

Terminal Apron Expansion

D VE $

2,100,000

$

7,000,000

$

763,000

$

1,596,600

$

2,500,000

6/15/2009

$

500,000

6/10/2009

$

13,900,000

7/10/2009

P P A

Cascade Twp/Kent County

Perimeter Road Reconstruction - This project will reconstruct those portions of the Perimeter Road that have a pavement condition index rating of Poor or Very Poor as a result of our pavement analysis update. The Perimeter Road is used for the movement of operations, emergency, security, & maintenance vehicles around the airfield without having to cross an active runway. The Perimeter Road is an important part of the airport's security program as it allows for a perimeter security check to be made on an ongoing basis. Design plans are currently underway and environmental approval has been received. The project will be ready to bid in April, 2009.

Cascade Twp/Kent County

Taxiway 'Y' Reconstruction - The current pavement condition index rating of this taxiway is Poor. This taxiway serves major corporate tenants on the airfield, including AeroMed. Daily activity on the taxiway includes business class jets. This project will provide improved access to vacant property allowing for improved development potential resulting in future job creation. Design plans have been completed, environmental approvals received, and the project is ready to go out to bid.

T O

Funding Request

Route (Infrastructure Only)

N s

t s e

u q e

Gerald R. Ford Grand Rapids/Kent International Airport County Gift of A Helping Hand, Inc. Detroit

Gilmore Car Museum

Hickory Corners/Barry

02262009

i m

b u S

R d

e t tt

Family Creativity Center

Gilmore Car Museum Expansion

Security Bollards - This project will provide improved security to the terminal building with the installation of security approved bollards along the front curb. The major threat to current building facilities is a vehicle coming through the front of the terminal. The proposed security bollards are designed to Dept. of State K4 and K12 ratings, stopping a 15,000 pound vehicle traveling at 35 or 50 MPH. The project has been endorsed by the Transportation Security Administration(TSA). Design plans have been completed, environmental approvals received, and the project is ready to be bid.

Setting up education & workforce development resources for families in need.

2/15/2009

The Gilmore Car Museum (a501c3) in Southwest Michigan has initiated a $13.9 million capital campaign to expand its facilities and programing to accomidate growing numbers of visitors and school groups drawn by its world-class collections displayed in historic structures on 90 scenic acres in rural Barry County. This expansion will enable the Museum to go to year-round operations and will help enhance its role as a Michigan destination and, equally important, as an educational resource for local schools. Since 2000 annual attendance at the Museum has doubled to 45,000 (sixmonth season), of which an estimated one-third comes from out of state. 4/1/2009

Submitted Requests - Not Approved

267 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

This project's purpose is to construct a multi-generational community center, providing Senior Meal Services / Activities and Library Services / Activities in the same building, with the existing hockey rink, gymnasium, fitness & aerobics areas. It will consist of a 31,200 square foot expansion on 2 floors, concrete and steel construction. This one "stop-shop" will provide efficiencies of scale with public transportation available, and additional employment. This facility will become a complete multi-generational Will start within 90 Completion 9 (nine) months after Gladwin County District Gladwin County --- District Library Expansion community center which will improve the 'Quality of Life" for residents and tourists of days of funding availabilty start date $ Library Gladwin, Michigan 48624 / Council on Aging Kitchen and dining FacilitiesGladwin County.

Glen Lake Community Maple City, Kasson Schools Township

Glen Lake Community Maple City, Kasson Schools Township

Glen Lake Community Maple City, Kasson Schools Township Global Educational Excellence Global Educational Excellence

Global Educational Excellence

Global Educational Excellence

Global Educational Excellence

Dearborn

Dearborn

Lighting Upgrade

Lighting Upgrade - Replace old technology lighting (metal halide, T-12 florescents) with energy efficient T-5 florescent lighting in gyms, classrooms and hallways. Oldest generation of lighting is 30+ years, newest is 17 years. 80% of project is in the 30+ years old. 4/1/2009

Window & Door Upgrade

Window & Door Upgrade - Replace existing single pane classroom windows with energy efficient thermopane units to greatly reduce heat loss and provide more student comfort and security. Windows are in disrepair have fallen out of frame and add to both energy and security issues. Oldest windows & doors are 30 years old. Newest windows and doors are 17 years old. 80% of the project would address windows and doors 30 years old. This would also include replacing older door systems at entry ways to reduce heat loss and provide a higher level of security. We have a problem of either being locked in building or out of building because of disrepair of doors. 7/1/2009

Restroom/Locker Room Upgrades

Restroom/Locker Room Upgrades - Renovate areas and reduse water and electric use by replacing old high use fixtures and lighting with new low flow fixtures and energy efficient lighting. Provide ADA compliant facilities for staff and students.

Riverside Academy

The Academy on the Schaefer Road site needs environmental clean-up for the outside to provide green space for the students to participate in outside recreational activities.

02262009

$

750,000

8/1/2010

$

300,000

7/1/2009

8/1/2010

$

400,000

6/1/2009

$

150,000

9/1/2009

$

200,000

This project is a multi-disciplinary project encompassing various aspects of construction. The preschool program is moving to a new site and the new site will need environmental clean-up and renovation to the existing interior and exterior of the building to meet all required inspections. including adding technology infrastructure, HVAC, electrical and plumbing work 9/1/2009

3/1/2010

$

300,000

Bridge Academy

This project is a multi-disciplinary project encompassing various aspects of construction. The Academy has a large empty green space that needs to be renovated to be developed into sport fields so the students have a safe place to play outside and participate in sport competitions. This project will include the cleaning of the grounds (environmental) and construction of sport facilities. 6/1/2009

12/1/2009

$

100,000

Bridge Academy

This project will be placing modular classrooms on the current Academy site to encompass the increasing number of students. The Academy has 4 existing modular rooms on an off-site location. This project would be to move the modulars and do the required renovations to them to make them into functional classrooms including adding technology infrastructure, HVAC, electrical and plumbing work 6/1/2009

11/1/2009

$

250,000

d e tt

it

m b u

S Hamtramck

8/1/2010

-N

e u

5,000,000

12/1/2009

Riverside Academy

Hamtramck

s t s

D VE

This project is a multi-disciplinary project encompassing various aspects of construction. The Academy has two building sites and needs space built on both sites to create space for a cafeteria. 6/1/2009

Riverside Academy

Dearborn

T O

P P A

O R

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

268 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Global Educational Excellence

Global Educational Excellence

Global Educational Excellence

Global Environmental Engineering, Inc.

Hamtramck

Ann Arbor

Ypsilanti

Project Name

Frontier International Academy

Central Academy

This project is a multi-disciplinary project encompassing various aspects of construction. The project entails renovation of an empty office building leased by the Academy. The renovation includes creating 12 more classrooms and other necessary rooms such as bathrooms/office space in the new building, including adding technology infrastructure, HVAC, electrical and plumbing work. 6/1/2009

Victory Academy

This project is a multi-disciplinary project encompassing various aspects of construction. The Academy is moving from a 1 acre site to a 10 acre site which has an existing building that needs environmental clean-up and remodeling to be student ready including adding technology infrastructure, HVAC, electrical and plumbing work 6/1/2009

P P A

O R

Funding Request

$

1,500,000

9/1/2009

$

400,000

9/1/2009

$

375,000

In Michigan alone, there are hundreds of low producing natural gas wells that are not in production due to the high cost of hydrogen sulfide (H2S) removal. Global Environmental Engineering Inc (Global) has been discussing the implementation of a low cost removal technology with Dr. Marc Deshusses in the Department of Civil and Environmental Engineering at Duke University and BreitBurn Energy, LLC in Gaylord, Michigan. Dr. Deshusses has conducted extensive research utilizing bacterial to remove H2S from gas streams. Global has approached him to partner and take his work to the commercial application stage. Dr. Deshusses will pilot the technology and Global will engineer commercial scale units for application in the natural gas production field. BreitBurn has agreed to allow Global to conduct pilot and full scale testing of the treatment units at several of their natural gas wells that are currently shut-in (not producing) due to high H2S removal costs. BreitBurn is very interested in applying the technology once perfected.This technology will have innumerable applications in the oil and gas industry, biofuels industry, landfill gas industry and man 7/1/2009

6/30/2011

$

250,000

This proposal is to implement a technology to remove volatile organic compounds (VOCs) from gas streams. Currently many industries use Regenerative Thermal Oxidizers (incinerators) to burn VOCs to meet air quality standards. To accomplish this natural gas is burned in a chamber the VOCs pass through. The VOCs are converted to nitrous oxides, carbon monoxide, and carbon dioxide. These are used by any coating operation: automobile, printing, pharmaceutical, and plastics industries for example. This technology can remove VOCs from the gas stream and recycle the solvents recovered. The result is the company no longer burns natural gas to control pollution; the resulting pollutants from the combustion of the natural gas and VOC are eliminated; and the company can reuse the recovered solvents. Global Environmenta Engineering Inc. is currently working with a medium sized client (84 employees) to develop a full scale system to recover their solvent using this technology. We estimate the technology will save the company approximately $16,500 in electricity costs; $112,000 in natural gas costs; and $926,000 in solvent costs per year. This com8/1/2009 Silver Lake 2009

3/1/2010 2010

$ $

N s

Route (Infrastructure Only)

D VE

12/1/2009

T O

t s e

u q e

R d

e t t

t i m

b u S 02262009

Start Date

This project has three parts; Renovating the current Academy Site Renovating a building near the current site to house more students Building two new gymnasiums This project is a multi-disciplinary project encompassing various aspects of construction. The Academy is currently in a building that is 100 years old and requires a renovation to encompass the modern infrastructure needed to house a high school. The project will include environmental clean-up and renovations to the existing infrastructure of the building. The project also entails the renovation of a building near to the current building to house the middle school students. The renovation includes creating classrooms and other necessary rooms such as bathrooms/office space in the new building, including adding technology infrastructure, HVAC, electrical and plumbing work. The project also includes the building of two new gymnasiums one at both work sites. 6/1/2009

In Michigan alone, there are hundreds of low producing natural gas wells that are not in production due to the high cost of hydrogen sulfide (H2S) removal. Global Environmental Engineering Inc (Global) has been discussing the implementation of a low cost H2S Removal

Global Environmental Engineering, Inc. Golden Township

Project Description

Expected Completion Date

VOC removal from gas streams Silver Lake

Submitted Requests - Not Approved

1,000,000 10,000 Yes

269 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Goodrich Area Schools Goodrich, MI

Project Name

Project Description

Start Date

Goodrich Reid Elementary

Goodrich Reid Elementary is part of a K-12 program that serves 2,200 students. Upgrades to lighting equipment and modificatiopns to entry ways would improve energy efficiency.

7/1/2010

11/1/2010

7/1/2009

Goodrich, Village

Village of Goodrich

Wheelock & Watkins Drain Enclosure

Replacing the existing undersized and outdated material for approximately 1,200 feet with a 30-inch concrete enclosed drain. This drain currently floods homes and businesses during major rain events. 3/1/2009

Goodrich, Village

Village of Goodrich

Hegel Road Bridge Dam

Replacement of the existing dam, which contains three flood gates, with a stream naturalization, including a spillway which will control the Mill Pond water level.

T O

N s

st

12/31/2009

3/1/2009

Through a new strategic plan, the Michigan State Fairgrounds and Exposition Center will be recognized and enhanced as the preferred special event venue in Metropolitan Detroit through a new collaboration that will train over 120 Goodwill Industries of Greater Detroit trainees for future careers annually. The Goodwill workers are disadvantaged individuals who will gain valuable employment experience in a professional work environment while the MSFEC gains the additional labor necessary to more effectively maintain and enhance its grounds. The ability of the MSFEC to realize its vision of becoming the preferred venue for year round, family oriented educational, entertainment and recreational activities is hindered by the deteriorating infrastructure of many of its buildings and the lack of attractiveness of its grounds. Goodwill Industries of Greater Detroit will plan, implement and manage a workforce Workforce Development and Restoration preparedness program designed to assist men and women in moving to financial Project Goodwill Industries and the Michigan stability with goal-based workforce preparedness activities that include an array of State Fairgrounds & Exposition Center vocational and employment outcome focused services. Through collaboration with Go 5/1/2009

Goodwill Industries of Greater Detroit Contact: Russ Russell Detroit

Expected Completion Date

O R

Funding Request

$

26,350

D VE $

$

300,000 Seneca Street

1,000,000 West Hegel Road

P P A

5/1/2011

$

721,656

6/1/2009

9/1/2009

$

10,000

6/1/2009

9/1/2009

$

50,000

Grand Blanc Academy Grand Blanc

Replace (6) exterior doors

Grand Blanc Academy Grand Blanc

Construct athletic fields

Grand Blanc Academy Grand Blanc

Build (5) new classrooms and gym

6/1/2009

9/1/2009

$

1,600,000

Grand Blanc Academy Grand Blanc

Carpet offices and library

6/1/2009

9/1/2009

$

13,000

6/1/2009

9/1/2009

$

40,000

e u

eq

R d

Grand Blanc Academy Grand Blanc

Tile (22) classrooms

Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc

Township Hall energy efficiency and conservation program

i m

ub

Charter Township of Grand Blanc Township Grand Blanc

S

Charter Township of Grand Blanc Township Grand Blanc

02262009

e t tt

ADA ramp installation

Route (Infrastructure Only)

Develop and implement an energy efficiency and conservation plan for the township's government building 4/1/2009

7/1/2009

$

Township Hall Grand Blanc 100,000 Township

Install ADA ramps in subdivsion where sidewalk is present without any connections or ramps to public road to allow all pedestrians to cross streets and walk to schools. Expand existing contract in place for work. 4/1/2009

7/31/2009

$

150,000 various locations

$

Perry Road (Genesee Road to 150,000 Township limits)

$

Maple Road - south side (Fenton Road 180,000 to I-475)

Pathway installation

Install 2,000 l.f. of 10' wide pedestrian/non-motorized pathway system to allow neighborhood residents/students to walk to school and recreational facilities

Maple Road Sidewalk - CDBG

Install 1,500 l.f. of 5' wide concrete sidewalk adjacent to 5 lane road for pedestrians to walk to services from home. Expand existing contract in place for work. 4/1/2009

Submitted Requests - Not Approved

4/1/2009

9/15/2009

7/31/2009

270 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc

Project Name

Project Description

Start Date

Expected Completion Date

The project is part of the Grand Blanc Township Water System Master Plan and is in the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. The project consists of the installation of 1800 feet of 8" watermain with fire hydrants Grand Blanc Township Water System Capital and provides public water supply to a portion of the Ottawa Hills subdivision that is Improvement Program, Ottawa Hills currently on individual wells. Project is in conjunction with a street repaving and storm Subdivision 8" watermain installation project drain improvement project. State and Local permits have been applied for. 6/1/2009

Pathway installation

Install 3,200 l.f. of 10' wide pedestrain/non-motorized pathway system to allow neighborhood residents to walk to shopping center.

4/1/2009

Charter Township of Grand Blanc Township Grand Blanc

Hybrid vehicle purchase

Replace 10 government fleet vehicles with hybrid vehicles removing gasoline only vehicles from primary fleet. Vehicles to be purchased from local Ford dealer immediately.

2/27/2009

Charter Township of Grand Blanc Township Grand Blanc

Install 18,300 l.f. of 5' wide sidewalk along Saginaw Street in accordance with approved non-motorized master plan and adopted Saginaw Corridor redevelopment Saginaw Road sidewalk - pedestrian pathway plan

A T

6/1/2010

PP

O R

4/1/2009

9/15/2009

3/15/2009

7/1/2009

Funding Request

Route (Infrastructure Only)

$

The project will be located in Ottawa Hills Subdivision on Woodworth Drive 194,400 and Cayuga Drive

$

Dort Highway (Gibson Road to 250,000 Hill Road)

$

273,000 n/a

$

Saginaw Road from Maple Road south to the 366,000 Township limits

D VE

Pathway installation

Install 5,200 l.f. of 10' wide pedestrian/non-motorized pathway system to allow neighborhood residents to walk to shopping center

4/1/2009

9/15/2009

$

Embury Road (Grand Blanc Road 390,000 to Cook Road)

Charter Township of Grand Blanc Township Grand Blanc

Hybrid vehicle purchase

Replace 10 government fleet vehicles with hybrid vehicles removing gasoline only vehicles from primary fleet. Vehicles to be purchased from local GM dealer immediately.

2/27/2009

3/15/2009

$

480,000 n/a

Charter Township of Grand Blanc Township Grand Blanc

The project is part of the Grand Blanc Township Water System Master Plan and is in Grand Blanc Township Hydrant Replacement the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. Program The project consists of replacing 124 obsolete hydrants in Grand Blanc Township 4/1/2009

$

Multiple locations throughout Grand 500,000 Blanc Township

$

The project route is along Baldwin Road from the western Township border to the existing 16" on Fenton Road in 572,500 Mundy Township

Charter Township of Grand Blanc Township Grand Blanc

Charter Township of Grand Blanc Township Grand Blanc

Charter Township of Grand Blanc Township Grand Blanc

u S

Charter Township of Grand Blanc Township Grand Blanc

02262009

e u

st

d e t

Grand Blanc Township Baldwin Road Interconnect Project

itt

q e R

s

O N

The project is part of the Grand Blanc Township Water System Master Plan and is in the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. The project will consist of the construction of approximately 1/2 mile of 16" watermain with fire hydrants that will provide a much needed loop to aid in reliability and fire flow capability. 4/1/2009

The project is part of the Grand Blanc Township Water System Master Plan and is in the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. The project is Phase 2 of the Embury Road Facility Improvements and consists of Grand Blanc Township Embury Road 500,000 500,000 gallons of additional ground storage that will serve the south end of Grand Gallon Ground Storage Upgrade Blanc Township and improve reliability, pressure, and fire flow in service area. 3/1/2009

bm

The project is part of the Grand Blanc Township Sanitary Sewer Master Plan and is in the Grand Blanc Township 2009 - 2015 Sanitary Sewer Capital Improvement Program. The project consists of the upgrade or abandonment of 6 sanitary sewer pump stations located in various areas of the Township. In some cases, where economically feasible, pump stations can be replaced with gravity sanitary sewers. In Grand Blanc Township Pump Station Upgrade other cased the stations have reached their design life and will be replaced and and/or Abandonment Program upgraded. 5/1/2009

Submitted Requests - Not Approved

11/1/2009

11/1/2009

6/1/2010

9/30/2010

$

8071 Embury Road, Grand 1,188,000 Blanc, Mi

$

Projects are located in various areas of the 2,748,000 Township.

271 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Charter Township of Grand Blanc Township Grand Blanc

Project Name

Project Description

Grand Blanc Township Subtrunk Televising and Rehabilitation Program

Start Date

The project is part of an ongoing Grand Blanc Township Program that has televised and repaired all sewers in the Township with the exception of the remaining subtrunks.5/1/2009

T O

Charter Township of Grand Blanc Township Grand Blanc

Charter Township of Grand Blanc Township Grand Blanc

Grand Blanc Township Footing Drain Disconnection Program

d e tt

t i m

Grand Blanc Township 24" Water Transmission Line

b u S

Charter Township of Grand Blanc Township Grand Blanc

Charter Township of Grand Blanc Township Grand Blanc

02262009

q e R

N s

st

The project is part of the Grand Blanc Township Water System Master Plan and is in the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. The project provides for a 24" transmission main with fire hydrants from the primary source of water for Grand Blanc Township, GCDC-WWS Center Road pumping and storage complex, through the middle of the service area to the recently upgraded Grand Blanc Township Embury pumping and storage facility. The project provides upgraded pressures and fire flows for the entire Grand Blanc Township service area. The project has been designed and all local and state permits have been secured. The design was paid for by Grand Blanc Township. State and local permits have been issued. 3/1/2009

Grand Blanc Township East Hill Road Watermain Replacement Project

The project is part of the Grand Blanc Township Water System Master Plan and is in the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. The project will consist of the construction of approximately 1 mile of 12" watermain with fire hydrants to replace the existing 8" watermain that is undersized. 5/1/2009

Grand Blanc Township Pressure District 1 Elevated Storage Tank

The project is part of the Grand Blanc Township Water System Master Plan and is in the Grand Blanc Township 2009 - 2015 Water System Capital Improvement Program. The project will consist of the construction of a 1 MG elevated storage tank in the northeast portion of Grand Blanc Township in pressure district 1. This area currently experiences low pressure and the tank will provide increased system reliability, pressure and fire flow capabilities. 7/1/2009

Submitted Requests - Not Approved

O R

P P A

The project is part of the Grand Blanc Township Sanitary Sewer Master Plan and is in the Grand Blanc Township 2009 - 2015 Sanitary Sewer Capital Improvement Program. The project consists of removing footing drain connections from the sanitary sewer, installing a sump and connecting sump pump to approved outlet thereby reducing basement sewage backups, sanitary sewer overflows and system inflow. 5/1/2009

e u

Expected Completion Date

9/30/2010

9/30/2010

9/1/2010

11/1/2009

9/30/2010

Funding Request

Route (Infrastructure Only)

$

The project involves the clearing of the existing easement, the televising of the subtrunk, and analyzing the digital films to determine the appropriate 3,000,000 repairs.

$

The project involves the disconnection of residential sump pumps and footing drains from the sanitary sewer. The targeted homes were constructed prior to 1980 and are located in various areas of 3,435,000 the Township.

$

The project begins in Grand Blanc Township at Maple Road and Center Road and travels south down Center Road to Hill Road, west on Hill Road to Dort Highway and then south on Dort Highway to 4,698,000 Embury Road.

$

The project route is along East Hill Road from Belsay Rd to Wakefield 744,250 Road

D VE

$

The project will be locate in Section 1 of Grand Blanc Township on approximately 2 2,862,500 acres of land.

272 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Charter Township of Grand Blanc Township Grand Blanc

Project Name

Project Description

Grand Blanc Township Slack Lake Subtrunk Upgrade

Start Date

The project is part of the Grand Blanc Township Sanitary Sewer Master Plan and is in the Grand Blanc Township 2009 - 2015 Sanitary Sewer Capital Improvement Program. The project consists of the replacement of approximately 14,000 feet of 15" and 18" sanitary sewer upgraded to 21" sanitary sewer to relieve a sanitary sewer area that is at design capacity and exhibits surcharging during the 25 year/24 hour design storm. 7/1/2009

T O

Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc

Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc

Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc

Expected Completion Date

P P A

O R

N s

9/30/2010

Funding Request

Route (Infrastructure Only)

$

The project is located in Grand Blanc Township and begins on Baldwin Road east of Saginaw Street and travels south through Woodfield Subdivision to the Woodfield Pump 4,122,000 Station.

The project begins at Baldwin Road and New Tech Drive and goes south a short distance, then east along the back of existing developments to Saginaw Street aligning with Woodfield 5,782,250 Parkway.

D VE

Technology Village Infrastructure Project

The project will provide roads, water, sanitary sewer, and storm drain to Technology Village incubator area that is currently zoned research and development. This will be joint private/public project with the R.O.W. being donated by the private property owners and the infrastructure being constructed with public funds. There will be tax abatements and utility connection abatements offered as further enticement for job creation. 7/1/2009

9/30/2010

$

Hiring youth for summer jobs

Hire 10 summer youth for government part-time jobs.

9/5/2009

$

50,000 n/a

7/15/2009

$

Genesee Road (Old Haverhill to south of Beverly 75,000 Drive)

7/31/2009

$

500,000 various locations

Sanitary Sewer installation Sanitary Sewer lining

d e t

e u

st

q e R

6/14/2009

Install 900 l.f. public sanitary sewer in area served by private septic fields. Several lots are vacant and do not pass soil tests for the installation of septic fields. 5/1/2009 Reline existing sanitary sewer system to reduce basement sewage backups, sanitary sewer overflows, inflow and infiltration. 2/27/2009

Holly Cook Regional Flood control basin

Purchase of flood plain easements 200'x2,000' = 400,000s.f. @ $2/s.f. to construct regional storm water detention basin.

4/1/2009

5/1/2009

$

Seaver Drain regional storm water detention 800,000 basin.

Watermain installation

Install 26,400 l.f.public water main with fire hydrants in area served by private individual wells to provide potable water and fire protection. Area is known for high arsenic levels.

5/1/2009

11/15/2009

$

Williamsburg 1,320,000 Farms Subdivision

tt i m

b u S 02262009

Submitted Requests - Not Approved

273 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Charter Township of Grand Blanc Township Grand Blanc

The project is part of the Grand Blanc Township Sanitary Sewer Master Plan and is in the Grand Blanc Township 2009 - 2015 Sanitary Sewer Capital Improvement Program. The project design has been completed and paid for with Grand Blanc Township funds. The project consists of the replacement of approximately 18,000 feet of 15" and 18" sanitary sewer upgraded to 24" sanitary sewer to relieve a sanitary sewer area that is at design capacity and exhibits surcharging during the 25 year/24 Grand Blanc Township District 6 & 11 Sanitary hour design storm. State and local permits have been applied for. Private contribution from Pulte Homes in lieu constructing peak flow storage. 4/1/2009 Sewer Upgrade

Charter Township of Grand Blanc Township Grand Blanc

Sump pump collection system

Install sump pump collection system to remove sump pump connections from sanitary sewer system reducing basement sewage backups, sanitary sewer overflows and inflow. 6/1/2009

Charter Township of Grand Blanc Township Grand Blanc

Saginaw Road / I-75 Regional Flood control basin

Purchase of flood plain easements 1,200'x2000' = 2.4million s.f. @$2/l.f. to construct regional storm water dentetion basin. 4/1/2009

Charter Township of Grand Blanc Township Grand Blanc

Hill Road / Fenton Road Intersection Reconstruct

The project consists of the reconstruction of the Hill Road and Fenton Road Intersection. Project is on the TIP list.

Charter Township of Grand Blanc Township Grand Blanc

McCandlish Road at Saginaw Street Right Turn Lane

The project consists of the placement of a right turn lane from west bound McCandlish Road to north bound Saginaw Street. Project is on the TIP list. 8/1/2009

T O

s t s

-N

e u

The project consists of the evaluating and adjusting the timing of all signals from the City Limit to Maple Road in Grand Blanc Township. Project is on the TIP list.

8/1/2009

Saginaw Street Signal Timing

Charter Township of Grand Blanc Township Grand Blanc

McWain Road Paving Cook Road To Baldwin The project consists of paving McWain Road an existing gravel road. Project is on the Road TIP list. 8/1/2009

Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc Charter Township of Grand Blanc Township Grand Blanc

The project consists of the reconstruction of approximately 2.1 miles of Hill Road from Fenton Road to Saginaw Street with signal improvements. Project is on the TIP list 6/1/2009 The project consists of extending M-54 (Dort Highway) from the overpass over I-75 south to Cook Road. Project is on the TIP list 8/1/2010 The project consists of the construction of an entrance ramp off Dixie Road onto North Bound I-75. Project is on the TIP list 8/1/2010

M-54 (Dort Highway) and I-75

i m

Dixie Highway and I-75

b u S

8/1/2009

R d

e t tt

Hill Road Reconstruction

Charter Township of Grand Blanc Township Grand Blanc

I-75 at Holly Road / Pollock Road

The project consists of constructing a loop from North bound Holly Road to north bound I-75. Project is on the TIP list

Grand Haven Township

Lakeshore Drive Water Main

Construction of 3,150' of 12" water main to tie in two dead ends and to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. 8/9/2009

Grand Haven Township Grand Haven Township

Grand Haven Charter Township

Grand Haven Charter Township Grand Haven Charter Township

02262009

Pierce, Winans, 168th Water Main Sunset Trail Water Main

8/1/2010

Construction of Water Main to provide service to Zelenka Nurseries and to connect dead end mains on the southern portion of the Township. The water main improvements are to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan. 8/9/2009 Construction of 2,600 feet of 8" water main to provide water to residents in the Sunset Trails Area. Sept. 09

Submitted Requests - Not Approved

O R

P P A

Charter Township of Grand Blanc Township Grand Blanc

eq

Expected Completion Date

Funding Request

Route (Infrastructure Only)

The project is located in Grand Blanc Township and begins at Vassar and Baldwin Road and travels north and slightly west to the Grand Blanc City limits near the Grand Blanc Golf 7,560,000 Course.

D VE

9/30/2010

$

9/15/2009

$

Ottawa Hills 800,000 subdivison

$

Regional storm water detention 48,000,000 basin.

11/15/2010

$

Hill Road and Fenton Road 200,000 Intersection

8/1/2010

$

McCandlish Road 200,000 at Saginaw Street

$

Saginaw Street from Grand Blanc North City Limits to 250,000 Maple Road

$

McWain Road from Cook Road south 1,600,000 to Baldwin Road

7/1/2009

10/1/2009

8/1/2010

6/1/2011

$

8/1/2012

$

8/1/2011

$

Hill Road from Fenton Road to 5,000,000 Saginaw Street M-54 from I-75 to 6,000,000 Cook Road Dixie Highway and I 7,000,000 75

8/1/2012

$

Intersection of Holly 10,000,000 Road and I-75

11/9/2009

$

400,000

11/9/2009

$

1,300,000

11/9/2009

$

320,000

274 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Grand Haven Township

Grand Haven Township Grand Haven Township Grand Haven Township Grand Haven Township

Grand Ledge Area District Library

Project Name

Project Description

M-45 Wastewater Collection System Extension: Service to Grand Rapids Water Treatment Plant

Construction of sanitary sewer and pumping station to service the southwestern portion of the Township and the City of Grand Rapids Water Treatment Plant with sanitary sewer.

Grand Haven Charter Township

Comstock Street Improvements

Reconstruction and widening of 2,600 feet of roadway with curb and gutter, storm sewer, water main, and sanitary sewer to service mixed use area of the township. Water Main proposed is recommended in the MDEQ reliability study for the Township. Additional 2,600 of milling and resurfacing to be completed. 4/10/2009

Grand Haven Twp

Water

Water

Grand Haven Twp

Wastewater

Wastewater

Grand Haven Twp

Street

Street

Grand Ledge Area District Library

Addition and renovation of the Grand Ledge Area District Library to include adding additional public access internet computers for job searching and unemployment claims The project would create construction job opportunities in the short term and improve the infrastructure in the long term.

Grand Haven Charter Township

Grand Ledge, also benefiting Oneida Twp. And Parts of Eagle, Watertown, Riley, Westphalia townships

A T

Grand Rapids, Michigan population 197,800 Library Community Center

Traverse City

i m

b u S Grand Traverse Academy

Traverse City

02262009

e t tt

Integrated Visual Learning

7/10/2009

PP

$

D VE $

1,150,000 Comstock Street

$

600,000 Yes

$

1,000,000 Yes Yes

720,600

Community center at Van Belkum branch of the Grand Rapids Public Library to be located in remodeled space on the 2nd floor of the existing building. An elevator must be installed to provide ADA access. The following is a summary of the costs of this project: Building/Renovation Expense $398,000; Site Modifications $5,000; Contingency for Design $35,000; Contingency for Construction $40,000; Furnishings $78,000; Fees/Permits $50,000; Initial Design $7,800. Many youth programs are currently limited due to lack of sufficient space in the present configuration. This will allow expansion of programs and avoid encroachment on patrons using the Library in other capacities. This project was put on hold due to lack of funding available on July 21, 2008, when the initial design was completed. The competitive bidding process could be completed within 60 days and construction could begin shortly thereafter. Only two of our eight urban locations have community centers. This would be a community-wide asset, since our community centers are used for literacy training and other groups and organizations. 5/1/2009

12/31/2009

$

613,800

Grand Traverse Academy will upgrade its 104,000 square foot 52 classroom facility to continue its transition to a less paper intensive operation. Wireless hubs will connect newly installed Smartboards and overhead digital projectors in order to rely on interne resources reducing traditional paper information delivery.

9/1/2009

$

320,000

Grand Traverse Academy and consultants will electronically reorganize lesson conten to enhance student performance and teacher efficiency. The software builds on Integrated Visual Learning (IVL), which has already been implemented successfully among a small core of teachers. Further investment in software development, researchers and illustrators will allow thousands of students to learn from hundreds of more effective teachers. Lessons will be built from Michigan's Grade Level Content Expectation standards. Teachers benefit from this intuitively elegant methodology while students learn faster and retain longer. Content will be organized to match the structure of human thought. Thinking mirrors the branching physical structure of our brain; one thought leads to another and another much like branches of a tree. We think in images, meaningful conceptual wholes; whereas, language is sequential and symbol-based. Teaching and learning is complicated by the structural difference between thought and language. IVL includes a system of enhancing visual thinking and visually reorganizing lesson content. When the interface between computer and u

9/1/2010

$

850,000

u q e

Submitted Requests - Not Approved

Route (Infrastructure Only)

950,000

$

O N

5/9/2009

R d

Grand Traverse Academy Technology Upgrade

11/9/2009

Funding Request

5/10/2009

t s e

Grand Traverse Academy

Sept. 09

O R

s

Grand Rapids Public Library

Start Date

Expected Completion Date

275 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Grand Traverse Academy

Grand Traverse Academy Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools

Project Name

Project Description

Start Date

High School Building

Grand Traverse Academy will build an energy efficient 51,000 square foot High School building to open September 2010. Local site plan approval and architectural plans have been completed. Project timetable, originally planned to commence March, 2009 had been delayed due to economic factors. This grant would re-establish a 2009 start date.

Traverse City

Climate Control System

Grand Traverse Academy will install the TotalControl environmental energy usage controller program to allow Grand Traverse Academy to conserve natural gas and electricity. With the flexibility of remote access to hvac controls we would be able to conserve energy at any time, not just when we are onsite to access the heating and cooling controls. With 44 heating and cooling units at this facility any day school was not in session we could run an unoccupied program that would reduce the demand for heat by 8 degrees and cooling by 10 degrees. Reducing the demand reduces the amount of natural gas and electricity used. If we combine the number of days school is not in session throughout the school year due to weather, the 19 days of holiday break, and 60 days of summer vacation the potential to save energy is substantial.

Grandville MI

Central Elementary plumbing

Replace and upgrade hot water and cold water plumbing to classrooms.

Grandville MI

Cummings Elementary classroom lighting

Replace and upgrade calssroom lighting.

Grandville MI

South Elementary roof replacement

Grandville MI

Traverse City

Expected Completion Date

9/1/2010

O R

Funding Request

D VE $

7,650,000

P P A

6/1/2009

$

6,100

6/8/2009

8/31/2009

$

67,972

6/8/2009

8/31/2009

$

74,250

8/31/2009

$

310,000

Grand View Elementary roof

Replacement of roof. 6/8/2009 Replacement of roof, including improvements to gutters and exterior finish insulation system. 6/8/2009

8/31/2009

$

360,000

Grandville MI

Grand View Elementary boilers

Replace boilers, univent filter frames, and general upgrades to HVAC system.

6/8/2009

8/31/2009

$

450,000

Grandville MI

East Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

500

Grandville MI

Central Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

3,400

Grandville MI

West Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

3,600

Grandville MI

West Elementary fence

Install fence at the south side of the campus.

6/8/2009

8/31/2009

$

3,750

Grandville MI

Cummings Elementary power pole

Replace power pole at parking lot with underground supply.

6/8/2009

8/31/2009

$

4,160

Grandville MI

South Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

4,420

Grandville MI

Cummings Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

4,950

East Elementary dumpster

Move dumpster and enclose

6/8/2009

8/31/2009

$

5,000

Central Elementary ventilation

Replace and upgrade staff bathroom ventilation system.

6/8/2009

8/31/2009

$

5,000

Grand View Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

6,220

Grandville MI

East Elementary fence

Install fence at the north side of the campus.

6/8/2009

8/31/2009

$

7,500

Grandville MI

Central Elementary fence

Install fence at the south side of the campus.

6/8/2009

8/31/2009

$

7,500

Grandville MI

East Elementary fire alarm system

Replace and upgrad building's fire alarm system.

6/8/2009

8/31/2009

$

7,500

Grandville MI

West Elementary ceiling

Replace and upgrade acoustical tiles in building.

6/8/2009

8/31/2009

$

14,750

ub

Grandville MI Grandville MI

S

Grandville MI

02262009

tt i m

d e t

s t s

T O

-N

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

276 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools

Location City or Township

6/8/2009

8/31/2009

$

15,000

Grandville MI

Grand View Elementary fence

Install fence at the north side of the campus.

6/8/2009

8/31/2009

$

18,000

Grandville MI

Install fence at the edge of the campus.

6/8/2009

8/31/2009

$

22,500

Grandville MI

South Elementary fence Grandville Administration building fire protection

8/31/2009

$

25,000

Grandville MI

West Elementary parking and entrance.

Replace fire protection plumbing. 6/8/2009 Redesign and improvement of parking area at entrance to building to improve safety and expand space available for pick-up and drop-off. 6/8/2009

$

81,200

Grandville MI

Central Elementary ceiling

Replace and upgrade acoustical tiles in entire building.

8/31/2009

$

85,000

Grandville MI

Central Elementary entry and parking

Redesign and improvement of parking area at entrance to building to improve safety. 6/8/2009

8/31/2009

$

89,000

8/31/2009

$

190,000

County of Gratiot

Gratiot County Gratiot County Gratiot County Road Commission

County of Gratiot County of Gratiot

Grass Lake Township Grass Lake Township Grass Lake Township Grass Lake Township Grass Lake Township Grass Lake Township

Funding Request

Replace and upgrade acoustical tiles in entire building.

Gratiot County

Grass Lake Township

Start Date

East Elementary ceiling

Grass Lake Township

Grass Lake Township

Project Description

Grandville MI

Grandville MI Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township Grass Lake Charter Township

Grass Lake Township

Project Name

Expected Completion Date

6/8/2009

A T

PP

Upgrade and/or replace playground equipment to meet mandatory safety standards, Cummings Elementary playground including relocation of certain equipment from a different campus. 6/8/2009 Grass Lake Township Safe Routes to School Projects Portage St. to Willow Creek Ln. subdivision (Mt. Hope Rd.) Grass Lake Township Safe Routes to School Projects Pious Union to Andover subdivision (Mich. Ave.)

s

Grass Lake Township Infrastructure Projects Sewer extention on Norvell Rd. Grass Lake Township Safe Routes to School Projects Clark St. to Keane Dr. subdivision (Wolf Lake Rd.)

st

O N

O R

Spring 2009

8/31/2009

D VE

Summer 2009

Route (Infrastructure Only)

$

18,000 NA

$

27,000 NA

$

45,000 NA

$

45,000 NA

Grass Lake Township Infrastructure Projects

Water extention on east Michigan Avenue

Spring 2009

Summer 2009

$

135,000 NA

Grass Lake Township Infrastructure Projects

Equalization basin on east Michigan Avenue

Spring 2009

Summer 2009

$

478,000 NA

e u

q e R

Grass Lake Township Infrastructure Projects

Water extention on Knight Rd to Tenneco Corp.

Spring 2009

Summer 2009

$

520,000 NA

Grass Lake Township Infrastructure Projects

Sewer extension on Warrior Dr. and north to Grass Lake Road

Spring 2009

Summer 2009

$

578,000 NA

Grass Lake Township Infrastructure Projects

Sewer extension in Lockwood subdivision

Spring 2009

Summer 2009

$

633,000 NA

Grass Lake Township Infrastructure Projects

Sewer extension on east Michigan Avenue Fortification of Gratiot County Courthouse fo modern security requirements. Badge access, doors, locks. Repair of crumbling plaster, concrete, etc. from water damage and aging of 106 year old structure Purchase of van for transporting handicapped senior citizes

Spring 2009

Summer 2009

$

2,570,000 NA

3/9/2009

4/9/2009

$

40,000

3/9/2009 2/9/2009

5/9/2009 2/9/2009

$ $

275,000 40,000

tt i m

d e t

County Courthouse Securitization County Courthouse Historical Structure Repairs / Preservation Handicapped Senior Van

b u S

Bethany Twp

Riverside Drive

1 mile of Road Reconstruction

7/9/2009

11/9/2009

$

McGregor Road to 500,000 City limits Bridge over County 320,000 Drain #131

Gratiot County Road Commission Gratiot County Road Commission

New Haven Twp

Bennett Road Bridge

Structure Replacement

6/9/2009

11/9/2009

$

North Star Twp

Road Commission Garage

Replace existing main Garage/Shop which was built in 1940

8/9/2009

8/10/2009

$

Gratiot County Road Commission Gratiot County Road Commission

Seville Township Seville, Sumner, Pine River, Arcada Twps

LumberjackRoad

4.1 miles of Road Reconstruction

6/9/2009

11/9/2009

$

Lincoln Road

7.5 miles of Road Reconstruction

6/9/2009

11/9/2009

$

02262009

Submitted Requests - Not Approved

6,000,000 from M46 to North 1,640,000 County Line Lumberjack Road 3,000,000 to Luce Road

277 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Gratiot County Road Commission Gratiot County Road Commission Grattan Academy Grattan Academy

Washinton & Elba Twps

Wilson Road

9.75 miles of Road Reconstruction

North Star Twp Grattan Grattan

US127 Buchanan Road Interchange Grattan Academy Grattan Academy

Grattan Academy

Grattan

Grattan Academy

Construct Interchange Legs for an overpass as a part of US127 Construction Install a two-way intercom system in the Elementary for student safety Green Heating and Cooling system for the Elementary New floor covering for the Elementary. The flooring that is currently there is over 30 years old.

Grattan Academy Great Lakes Energy Service

Greenville & Grattan

Grattan Academy

To enhance technology with wireless broadband connectivity, two modern computer labs, and classroom smart boards for the High School and Elementary.

DeWitt

Green Buildings - LEED Educational Center

Development of a LEED Certified Educational Center showcasing Green technologies

Energy Efficiency Housing Retrofits

Low Income Energy Services: We provide a variety of energy efficiency services and programs that serve the low-income population throughout Michigan. Programs include educational workshops and trainings on weatherization, home energy visits, heating system , water heaters and thermostats repair or replacement. 3/1/2009

3/1/2011

Home Weatherization

Energy Education Workshops, Seminars , Trainings and Audits: Residents and businesses in Michigan can learn low cost ways to improve their energy efficiency and lessen their impact on the environment. We provide economical and practical solutions that prioritize energy efficiency for homes and small businesses. Introductions to renewable energy and technologies.Residential Assessments and Audits: We provide top quality home energy audits (visit) to a full blown energy audit to Michigan residents and small businesses. Clients are provided with energy technologies and information for making their homes and businesses more energy efficient. We tailor our services to fit the needs of each client. 3/1/2009

3/1/2011

Great Lakes Energy Service

Great Lakes Energy Service

Statewide

Statewide

Project Name

Project Description

Start Date

Expected Completion Date

6/9/2009

T O

t s e

$

9/1/2009 9/1/2009

$ $ $

9/1/2009

O R

P P A

N s

11/9/2009

9/1/2009

Route (Infrastructure Funding Request Only) US127 to Mason 3,900,000 Road Buchanan Road at 3,000,000 US127 12,000 30,000

D VE $

40,000

$

80,000

$

190,000

4/22/2011

u q e

Great Lakes Energy Service Great Lakes Energy Service

Rural Home Weatherization

Statewide

Smart Appliances

it

Great Lakes Labs, LLC Portage, MI

Paperboard recycling

u S 02262009

bm

R d

e t t

Statewide

Energy Education Workshops, Seminars, Trainings and Audits: Residents and businesses in Rural Michigan can learn low cost ways to improve their energy efficiency and lessen their impact on the environment. We provide economical and practical solutions that prioritize energy efficiency for homes and small businesses. Introductions to renewable energy and technologies.Residential Assessments and Audits: We provide top quality home energy audits (visit) to a full blown energy audit to Michigan residents and small businesses. Clients are provided with energy technologies and information for making their homes and businesses more energy efficient. We tailor our services to fit the needs of each client. 3/1/2009 Offer rebates to replace old appliances such as referigrators, thermostats old air conditioners 3/1/2009

Recycling paperboard eliminating new processing and landfill. Current customer base with excellent references - would like to have state incentives for both suppliers and customers. 1/1/2009

Submitted Requests - Not Approved

3/1/2011 3/1/2011

N/A

278 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Great Lakes Shipwreck Historical Society

Project Name

Project Description

Start Date

Federal stimulus funding will implement the 2002 Whitefish Point Human Use/Natural Resource Management Plan (“Plan”). The Plan was created by adjacent property owners Michigan Audubon Society, the Shipwreck Museum and the United States Fis and Wildlife Service. SHPO participated in and supports the Plan. The Plan is regarded as a model of land use planning, achieving the highest and best use of one of Michigan’s most important destinations from the point of view of history, education, cultural preservation and environmental enhancement. The Plan improves the former U.S. Coast Guard property at Whitefish Point on Lake Superior. The Plan enhances habitat for migratory birds, minimizes the impact of traffic upon the environment, develops educational assets on-site by constructing a video-theatre, changing exhibit gallery and replicates an historic building for use as a visitor center. Whitefish Point is Whitefish Township, a National Historic Site. The historic buildings and Shipwreck Museum serve as an Chippewa County, eastern Implementation of Whitefish Point Human Use educational and cultural destination for more than 150,000 visitors annually. The Upper Peninsula / Natural Resource Management Plan Shipwreck Museum owns and manages the museum complex which is a major contrib7/1/2009

T O

Greater Corktown Development Corporation

P P A

O R 12/31/2010

The Welcome Center (WC) is located in the Corktown Historic District of Downtown Detroit. Corktown is the oldest neighborhood in the City, dating to 1834. The WC will be located in an 1850's house, next door to the Workers Row House (WRH). The WC will serve as the orientation center for the WRH and the Corktown Historic District. The WRH is a three unit, four room row house built in 1850. The WRH was built to house workers and labors. And housed, "the people who built Detroit". The WRH Experience will connect the past to the present by promoting the experiences in immigration, labor, domestic daily life that link us. The WRH received a "Cool Cities" designation in 2005. It is the catalyst project for GCDC and has leveraged $260,000 private investment, partnerships with Wayne State University Department of Anthology Archeological Dig at the WRH. Also, Ball State University, U of M Dept. of Victorian Studies, Detroit Historical Society, the Motor Cities Auto Heritage, and Matrix Theatre. The WC will be the tour center for the historic district, Old Tiger Stadium, or the Workers Row House. The WC will also be the center for the Annual Corktown Tou 7/9/2009

Funding Request

Route (Infrastructure Only)

D VE $

2,935,500 n/a

N s

The Welcome Center at the Workers Row House

Detroit

d e tt

Greater Flint Arts Council

Expected Completion Date

Flint

02262009

t i m

S

ub

Building Renovation

t s e

qu

e R

In 1996 Greater Flint Arts Council purchased an abandoned building downtown Flint. We were the first to renovate a downtown building in 20 years. The building had an historic Vernors mural painted on the north side 40 feet high and 150 feet long. Our success in raising the funds to purchase and renovate, creating our first permanent residence, stimulated interest in the rest of the downtown area and was the catalyst for the formation of the Uptown Reinvestment Corporation, a non-profit development firm dedicated to the complete rehabilitation of downtown Flint. This resulted in more than 200 million in downtown renovations. At the time of renovation we could only afford to renovate the first floor of this 3-story building. We also could not afford the adjacent parking areas. Two very important agencies have lost their homes in the past year. There is a critical need to renovate the remaining two floors and create a home for the Flint Area Television Producers and the Buckham Alley Theatre. More than three dozen agencies use our current space for a wide variety of programs. Greater Flint Arts Council also needs additional space to accomodate the growing nee

Submitted Requests - Not Approved

$

9/30/2011

$

425,000

1,900,000 n/a

279 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Greater Flint Arts Council Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition Greater Flint Health Coalition

Project Name

Project Description

Start Date

Expected Completion Date

Genesee County

geneseefun.com

Greater Flint Arts Council seeks to implement a county-wide online virtual billboard for the arts. With a purchase of software from the ARTOPOLIS group in San Jose, CA, we will be able to tap into a growing nation-wide network. The arts and cultural agencies and producers of events of all kinds enter their information in an online form with pictures and links to other web sites. We employ a "gate-keeper" who approves each entry and sends it to the site. The site is a complete "one stop shop" for events where visitors can find out about the artists who are partcipating and even purchase Test site is up and tickets and find nearby restaurants and hotels. This site will increase participation in project is ready to local events, increase tourism, stimulate the local economy and create jobs. go at any time. 12/31/2010

Flint

Community Health Worker Training Program

Phone / copying / etc

Flint

Community Health Worker Training Program

Curriculum development

Flint

Community Health Worker Training Program

Admin costs

Flint

Community Health Worker Training Program

Background checks

Flint

Community Health Worker Training Program

Other

Flint

Community Health Worker Training Program

Supplies

Flint

Community Health Worker Training Program

Office space

Flint

Community Health Worker Training Program

Part time

Flint

Community Health Worker Training Program

Flint

Community Health Worker Training Program

Flint

Community Health Worker Training Program

Flint

Community Health Worker Training Program

d e tt

Greater Flint Health Coalition, 519 S. Saginaw Street, Suite 306, Flint, MI 48502 Flint

02262009

b u S

e u

Recruitment costs for students

q e R

t i m

Greater Flint Health Coalition Depression in Primary Care Program

s t s

-N

Community Health Workers Full time

1,144,360 n/a

6/1/2009

$

2,145

9/1/2009

6/1/2009

$

2,800

9/1/2009

6/1/2009

$

6,000

9/1/2009

6/1/2009

$

6,090

9/1/2009

6/1/2009

$

12,000

9/1/2009

6/1/2009

$

42,000

9/1/2009

6/1/2009

$

53,200

9/1/2009

6/1/2009

$

98,000

9/1/2009

6/1/2009

$

105,000

9/1/2009

6/1/2009

$

232,000

9/1/2009

6/1/2009

$

254,800

9/1/2009

6/1/2009

Within two years of start date $

300,000

P P A

Greater Flint Health Coalition (GHFC) is prepared to implement the Depression in Primary Care (DPC) project in Genesee County, consistent with the goals of the Health and Human Services’ Prevention and Wellness fund to improve Michigan’s healthcare infrastructure in the long term. The DPC project is seeking $300,000 to improve community-based prevention and wellness strategies in the area of depression treatment by implementing a Care Navigator program in Genesee County. This “shovel ready” project received planning support from a partnership grant to from the National Institute for Mental Health (NIMH) to the University of Michigan Depression Center and is now require funding to support infrastructure and implementation. Specifically, the DPC project will enhance job creation by employ local Care Managers to work with primary care physician practices and their patients. Care Managers will be trained to improve communication between interested primary care physicians and their depressed patients while aiding depressed patients with system navigation and referral services. This evidence-based clinical and community- ASAP

Submitted Requests - Not Approved

D VE $

9/1/2009

T O

O R

Funding Request

Route (Infrastructure Only)

280 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Greater Flint Health Coalition, 519 S. Saginaw Street, Suite 306, Flint, MI 48502 Flint

Greater Flint Health Coalition (GFHC) is prepared to implement and operate a Regional Health Information Exchange (HIE) for the Genesee Medical Trading Area (MTA) of Genesee, Lapeer, and Shiawassee Counties in Michigan. The proposed HIE would link 5 competing hospitals (Genesys Health System, Hurley Medical Center, McLaren Regional Medical Center, Lapeer Regional Medical Center, and Memorial Healthcare) across the region, as well as a critical mass of employed and private physicians thus facilitating the exchange of clinical patient health information to improve patient care outcomes. By building infrastructure to link disparate healthcare organizations, the GFHC’s Regional HIE will advance healthcare information enterprise integration, by building Health Information Technology (HIT) architecture that will support regional exchange while preparing for later interoperability with future statewide and nationwide HIT networks. Interoperability of clinical data repositories, as Greater Flint Health Coalition Regional Health well as privacy and security standards will be adhered to. Sustainability is a priority for Information Organization the project, as so far two regional hospitals (Genesys & Hurley) have pledged funds toASAP

Greater Flint Health Coalition, 519 S. Saginaw Street, Suite 306, Flint, MI 48502 Flint

Greater Flint Health Coalition (GFHC) is prepared to implement and expand its sector Workforce Employment and Training program, known as the Flint Healthcare Employment Opportunities (FHEO) Program, to enhance job creation in the healthcare field. Since 2002, the FHEO Program has offered training and education to Genesee County’s residents interested in a future healthcare career. The FHEO program currently offers training for three population subsets: (1) dislocated workers seeking to transition into a healthcare career; (2) community residents with little to no experience that are interested in entry-level healthcare careers; and, (3) currently employed healthcare professionals interested in expanding their skills to move up the career ladder. In 2004, Governor Granholm based the creation of 12 Michigan Regional Skills Alliances on the FHEO Program model. The GFHC, as a partner in both the U.S. Department of Labor programs Workforce Innovation in Regional Economic Development (WIRED) and the Mid-Michigan Partnership for Training in Healthcare (M-PaTH), is requesting $3 million in federal stimulus support to expand th ASAP

Greater Gratiot Development, Inc.

A T

s

Flint Healthcare Employment Opportunities (FHEO) for Dislocated and Entry-Level Worker Training

St. Johns to Ithaca (all communities north to benefit)

d e tt

t i m

ub

Green and Energy Operations

royal oak township, michigan 48220

Green Oak Township

Green Oak Township

Green Oak Township

Green Oak Township

Fieldcrest from Lee Rd south to 9 Mile Whitmore Lake road from 8 Mile north to silver Lake Road

Township of Grosse Ile

HVAC Replacement at the Waste Water Treatment Plant

Grosse Ile Township

S

02262009

Royal Oak Township Greening Project

O R

PP

Funding Request

Route (Infrastructure Only)

D VE

Within two years of start date $

10,000,000

Within two years of start date $

3,000,000

O N

qu

e R

US127 Limited Access Freeway Completion (St. Johns to Ithaca)

t s e

Expected Completion Date

Conversion of 16 miles of open access highway to limited access freeway. Project has been planned for 40+ years. Will benefit all communities of Michigan north of St. Johns. Engineering completed for majority of project. Partial Right of Way (ROW) acquisition funding has been secured. Will create hundreds of jobs for sustained period of time and will enable enhanced viability of communities north of St. Johns. 9/9/2009

9/11/2009

$

Construct a new LEED platinum certified municipal township public safety and municipal center . Rehab 30 homes to energy efficient standards and build 60 green build energy efficient homes both will use ground source geothermal as the heating and cooling source. The use of ground source geothermal is a renewable sustainable energy source which will eliminate the need for natural gas as the heating source for all the forementioned structures. The geothermal energy will be supplied by the Royal Oak Township Geo Utility. July, 2009

November,2011

$

24,000,000

Project consists of the replacement of the existing HVAC system at the Waste Water Treatment Plant to provide for more reliable heating, air conditioning and ventillation system in order to protect the existing controls and equipment from corrosion. 4/9/2009

11/9/2009

$

550,000

Submitted Requests - Not Approved

US127 (St. Johns 275,000,000 to Ithaca)

281 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Grosse Ile Township

Grosse Ile Township

Grosse Ile Township

Grosse Ile Township

City of Grosse Pointe

Township of Grosse Ile

Project Name

Start Date

East River Road Water Main Replacement

Project consists of the replacement of the existing water main between Ferry Road and Horsemill Road with a 12" water main including hydrants, valves and appurtenances to provide for a more reliable fire protection system and complete the 12" loop around the Island. 5/9/2009

11/9/2009

West River Road Water Main Replacement

Project consists of the replacement of the existing water main between Church Road and Grosse Ile Parkway with a 12" water main including hydrants, valves and appurtenances to provide for a more reliable fire protection system and complete the 12" loop around the Island. 5/9/2009

11/9/2009

Sanitary Interceptor Rehabilitation

Project consists of lining the existing 42" interceptor to provide for the removal of excessive amounts of infiltration/inflow from the sanitary collection system thus reducing the possibility of sewage bypasses and reducing sewage treatment cost.

4/9/2009

Church Road Water Main Replacement

Project consists of the replacement of the existing water main between East River Road and West River Road with a 12" water main including hydrants, valves and appurtenances to provide for a more reliable fire protection system and support the 12" loop around the Island.

5/9/2009

Funding Request

Route (Infrastructure Only)

$

1,650,000

$

1,610,000

P P A

10/9/2009

$

840,000

11/9/2009

$

1,405,000

8/1/2009

3/30/2010

$

South of Kercheval between Notre 7,500,000 Dame and St. Clair

2/1/2010

$

11/15/2010

$

8/30/2009

$

500,000

The existing 10" forcemain from the main lift station in the City of Bridgman to the connection to the GRSD Sewer Authority system was constructed in 1951 and has experienced numerous breaks in the last several years, causing untreated wastewater to be discharged onto the ground within the City limits. The proposed project would replace the 5,000 feet of 10" forcemain, not only creating short term construction jobs, but also eliminating an enviromental hazard. 4/15/2009

10/1/2009

$

Baldwin Street and 405,000 Rambo Road

Tamarron Sanitary Sewer

Construct Public Sanitary Sewer in the Tamarron plat

8/15/2009

11/15/2010

$

1,560,000

Hidden Lake Sanitary Sewer

Construct sanitary sewer around Hidden Lake to eliminate failing septic systems

8/15/2009

11/15/2010

$

2,431,020

Construct water main around Gull Lake - 150,000 LF water main around lake and elevated storage tank

8/15/2009

11/15/2011

$

20,400,000

North Peak Plat to Roll Ridge Sanitary Sewer Construct sanitary sewer North Peak Plat to Roll Ridge development

6/15/2009

11/15/2009

$

219,348

Richland Township

F Ave. Sanitary Sewer

Construct sanitary sewer in "F" Avenue from 27th St to 28th St

6/15/2009

11/15/2009

$

440,106

Richland Township

Gull Way Sanitary Sewer

Gull Way Sanitary Sewer

6/15/2009

11/15/2009

$

465,234

Richland Township

30th St. & Cottonwood Plat Sanitary Sewer

Construct sanitary sewer in 30th St Sanitary & Cottonwood Plat

6/15/2009

11/15/2009

$

514,914

Township of Grosse Ile

Township of Grosse Ile

Township of Grosse Ile

Grosse Pointe

Rehabilitation of 4800V electrical service, install exhaust fans and automatic damper ventilation system, re-point mortar on building, replace windows and doors, replace 1 pump and isolation valves, upgrade lighting, replace pipe supports, paint piping, replace motor on 1 pump with variation control along with other miscellaneous items of work. 8/1/2009 Line and/or replace deteriorated sanitary sewer lines recently indentified by CCTV Inspection 4/15/2009 Replacement of 1100 water meters and the installation of an Automatic Reading System on 2200 meters 4/15/2009

Neff Road Pumping Station Upgrades

City of Grosse Pointe

Grosse Pointe

Sanitary Sewer Repairs

City of Grosse Pointe

Grosse Pointe

Water Meter Replacement

d e t

10" Forcemain Replacement Project in the City of Bridgman

tt i m

Richland Township, Ross Township, Barry Township, Prairieville Township Gull Lake Water Main & Elev Tank

ub

S

Cooper Township

02262009

N s

400 car municipal parking structure

Grosse Pointe

GRSD Sewer Authority City of Bridgman Gull Lake Sewer & Water Authority Richland Township Gull Lake Sewer & Water Authority Richland Township

T O

Municipal Parking Structure

City of Grosse Pointe

Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority

Project Description

Expected Completion Date

t s e

qu

e R

Submitted Requests - Not Approved

O R

D VE

Northwest corner of 770,000 Neff and Charlevoix 5,250,000 City Wide

282 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gull Lake Sewer & Water Authority Gun Plain Township Gun Plain Township

Gun Plain Twp Gun Plain Twp

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Richland Township

27th St. & Eastern Heights Sanitary Sewer

Construct sanitary sewer in 27th St & Eastern Heights subdivision

6/15/2009

11/15/2009

$

863,171

Richland Township

Little Long Lake South Sanitary Sewer

6/15/2009

11/15/2009

$

912,000

Richland Township

30th St. (South of "D" Ave.) Sanitary Sewer

Construct sanitary sewer along the south shoreline of Little Long Lake Construct sanitary sewer in Gull Rd. (M-43); Gull Manor Plat; 30th St. (Gull Rd. to "DE" Ave.); 30th St. ("DE" Ave. to Englewood).

6/15/2009

11/15/2010

$

2,127,473

Ross Township

Gull Vista Plat Sanitary Sewer

Construct sanitary sewer in the Gull Vista Plat

6/15/2009

11/15/2009

$

610,608

Ross Township

MSU/40th St. Sanitary Sewer 10th Street, 106th Avenue & Miller Road Sanitary 8th St. & M-89 Sanitary Sewer

Construct sanitary sewer to M.S.U. and along 40th Street Install Sanitary Sewer in 10th Street, 106 Avenue, Miller Road and Adjacent Plant, including pump station and force main. 8th Street & M89 Sanitary Sewer & Sulfide Contro

5/15/2009

$

600,000

$ $

2,625,000 300,000

$

2,205,224

$

3,400,000

The project is a new PreK-12 school building for 750 students that will provide room for 300 new student enrollees. The remaining 450 students will transfer from another existing site. The school is designed by a LEEDs Hamadeh Educational certified architect firm. Its Services, Inc. ad Universal Academy Hamburg Township Hamburg Township Sewer Upgrade

Hamilton Commmunity Health Network Burton, Michigan

T O

st

Ore Lake Low Pressure Sanitary Sewer Upgrade

e u

d e tt

t i m

Burton Buiding

N s

q e R

8/15/2009 5/15/2009

P P A

O R 11/15/2009

11/15/2010 11/15/2009

3/1/2009

This project consist of a complete remodeling, including roof and parking lot replacement of a 17,000 square foot building located at G-3375 South Saginaw in Burton, Michigan. The building most recently housed a discount retail store and a donut shop. The remodeled facility will be a premier primary care medical clinic and a modern dental clinic with a retail pharmacy. The medical clinic will consist of 21 exam rooms, an X-ray room, patient waiting room, administrative areas and storage. The dental area is designed for 12 treatment rooms and also includes a waiting room and administrative areas. The small pharmacy area contains a retail counter and a separate exterior entrance for public access. Hamilton Community Health Network formerly Hamilton Family Health Center operates six (6) clinics providing family medicine, dental, behavior health and social services as well as family planning, immunizations for children and adults, pregnancy testing and counseling and pediatric services for the medically underserved populations in the Genesee County. 3/1/2009

7/1/2009

D VE

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

283 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

HCHN's Management Information Systems The requested funding would be used to purchase a new computer system (hardware and software) and telephone system for our medical and dental sites. First, our current software HealthPro is outdated and limited technical support from the company who wrote the program. The practice management software and hardware are used for patient scheduling, registration, discharge, billing medical and dental encounters for data collection that will be used for reporting the uniform data system (UDS) which is a required report for our federal grant. A new computer system for patient management and disease management would allow us to provide accurate data to our accrediting body Joint Commission of Accreditation Healthcare Office (JCAHO) and HRSA. Second, we discovered that our telephone system is obsolete and we need to upgrade our telephone equipment. We will immediately begin to implement the telephone system changes. These changes must be made quickly before our phone system is no longer operational. The result Health Information and Technology Equipment could shut down our operations in a manner of days. Staffing for our information mana4/1/2009

Hamilton Commmunity Health Network Flint

Expected Completion Date

T O

P P A

O R

This project consists of a complete replacement of Hamilton's oldest 16,000 square foot facility located at 4001 N Saginaw in Flint, Michigan. The facility, constructed over 70 years ago, has housed Hamilton's main service location for twenty years. The 15,000 square foot replacement facility will accommodate 22 medical exam rooms (12 adult/OB, 6 pediatrics, 4 specialty), 10 dental treatment rooms and a retail pharmacy. Replacing the aged, inefficient facility will afford the provision of services in a more cost-effective manner, provide better separation for adult and pediatric patients, add dental services and significantly improve the energy efficiency (green) of the location. The new facility would be located on the current site to ensure patient retention. Additionally, services would be maintained during construction with demolition of the existing facility occurring upon project completion. Hamilton Community Health Center formerly Hamilton Family Health Center operates six (6) clinics providing family medicine, dental, behavior health and social services as well as family planning, immu5/1/2009 Sidewalks 7/9/2009 Sidewalks 7/9/2009 Bridge 7/11/2009

Funding Request

Route (Infrastructure Only)

D VE

10/1/2009

$

1,100,000

1/1/2010

$ $ $ $

4,650,000 100,000 Grand River 200,000 Folwerville Road 5,000,000 Gregory Road

6/1/2011

$

N s

Hamilton Commmunity Health Network Handy Township Handy Township Handy Township

Flint Handy Township Handy Township Handy Township

Happendance

Okemos

02262009

qu

Main Building Sidewalks Sidewalks Overpass

tt i m

b u S

Happendance To Go

t s e

d e t

e R

For over 30 years, Happendance has stood at the forefront of arts-in-education programs by offering two outreach components to schools: 1) Performing - a team of professional dancers presenting a 55-minute interactive dance concert specially designed for young audiences. The Team?s performance/assembly program has been extremely popular, and until 2006-07, in very high demand. It served up to 8,000 schoolchildren per year, many of them inner-city. The show always features bringing a work of children?s literature to life (literacy), with other dances offering audiences a chance to look at everyday objects differently (math, science), or develop perspectives on social issues from environmentalism to cultural diversity. 2) Teaching - specially-trained professional educators involve students/teachers in a variety of age-appropriate movement experiences that are closely aligned with Michigan Education Standards for dance and core curricula. These activities not only enhance curricular goals, they reinforce ?kinesthetic intelligence?, as described by brain and education researcher Howard Gardner. Funding for the program has been fr7/1/2009

Submitted Requests - Not Approved

10,000

284 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Harbor Beach Area District Library

City of Harbor Beach in Huron County

Project Name

Project Description

Start Date

We are adding a new entry, stairwell and elevator to our Library Community Building which was built in 1927 and renovating the existing building so that each floor will have elevator access. A new Childrens Library Room will be created and the existing Childrens Room will be renovated to a Local History Room and Director's Office. Besides the public library, the building houses meeting rooms, a gymnasium and a theatre/auditorium. Accessibility to the meeting rooms is vital in our community because this building serves as a meeting place for many non-profit and community groups, including Girl & Boy Scouts, the local United Way, the Woman's Club and more. Improved accessibility will allow more people to take advantage of this Tentative community asset. We will be installing energy efficient doors in windows in the new groundbreaking April 1, 2009 Community Building Renovation and Addition construction areas.

O R

PP

Harbor Sewer Authority Harbor Sewer Authority

Reroute sewer mains south of Petoskey

Harbor Sewer Authority Harbor Sewer Authority

Sewer main project

Harbor Shores Development

City of Benton Harbor in conjunction with Harbor Shores Development Public At Plan. Five public art sculptures. Four of them would be commissioned to various State of Michigan Sculptors and one would be by world re-known sculptor Richard Hunt who has a studio in Benton Harbor. Breakdown of the selected locations. Two would be on the Bus. I-94 Turn Arounds in downtown Benton Harbor. One would be at the Benton Harbor Library. Two would be at Jean Klock Beach., 2/1/2009

Benton Harbor

Public Art

A T

Airport ramp rehabiitation, extension

Harbor Springs Airport Harbor Springs Airport

New terminal building

Harbor Springs Harbor Harbor Springs Harbor Springs Airport Springs Airport

Airport runway rehabilitation

City of Harrison

Harrison Township Harrison Township Harrison Township

e u

q e R

s

st

Harbor Springs Airport Harbor Springs Airport

Harrison Community Library

Expected Completion Date

O N

12/1/2009

6/1/2010

This project is for a building expansion/renovation to the current library building. Over the last 5 years the library is completed a building study regarding building a new library building. After careful discussion the library board has decised to renovate and currently in design expand at our current location. process 12/1/2010

Harrison TWP Harrison TWP Harrison TWP

Harrison Community Library building expansion/renovation L'Anse Creuse/Tucker Trunk Sanitary Sewer Extension Extend sanitary sewer to replace failing septic systems Acacia Road Sanitary Sewer Extension Extend sanitary sewer to replace failing septic systems Union Lake Sanitary Sewer Extend sanitary sewer to replace failing septic systems

7/1/2009 7/1/2009 7/1/2009

6/1/2010 10/15/2009 6/1/2010

Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township Harrison Township

Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP Harrison TWP

Ashland Chartier Sanitary Sewer Extension Elmite Sanitary Sewer Pineridge Chartier Willomere Hamon Long Winkler Hazel Boniare Court Sanitary Sewer

Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems Extend sanitary sewer to replace failing septic systems

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

6/1/2010 10/15/2009 6/1/2010 10/15/2009 6/1/2010 6/1/2010 6/1/2010 6/1/2010 4/1/2010 4/1/2010

Harrison Township

Harrison TWP

Coleridge Pump Station Upgrade

Increase capacity to accommodate industrial development in northern end of township8/1/2009

6/1/2010

Harrison Township Harrison Township Harrison Township

Harrison TWP Harrison TWP Harrison TWP

Prentiss Pump Station Upgrade Bridgeview Watermain Ereplacement Petit-ConleT Drain Cleanout

Increase capacity to accommodate industrial development in northern end of township8/1/2009 Replacement of failing watermain 8/1/2009 Clean out of Regional Drain 8/1/2009

6/1/2010 6/1/2010 6/1/2010

m b u

S

02262009

itt

d e t

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

D VE $

920,000

$

400,000

$

4,000,000

$

500,000

$

850,000

$

1,000,000

$

1,200,000

$

589,200

285 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Harrison Township Harrison TWP Harrison Township

Harrison TWP

Project Name Venter DeBeuff Drain Cleanout Beachwood stormwater pump station rehabilitation

Harrison Township

Harrison TWP

Irwin Drive Water Main & Meter Pit

Harrison Township

Harrison TWP

Lenfesty Sanitary Sewer Rehabilitation

Heat Transfer International Heat Transfer International

Heat Transfer International

Heat Transfer International

Heat Transfer International

Kalkaska, MI

Municipal Solid Waste (MSW) to Energy Project with American Waste located in Kalkaska, MI. American Waste recently installed a state-of-the-art Material Recycling Facility (MRF) that reduces approx. 50% of the MSW that goes to landfill. The remaining 50% of the MSW will be converted to approx. 2,300KWH of power. 7/1/2009

Kentwood, MI

HTI

Manistique, MI

Municipal Solid Waste (MSW) to Steam Project with Manistique Rental Inc. (MRI) located in Manisique, MI. MRI is located next to Manistique Paper Company so the scope of the project is to produce 140,000lb/hr of "green" steam that Manisique Paper Co. will purchase from MRI. This project will allow Manistique Paper Company to shu down their existing coal fired boilers. 7/1/2009

Funding Request

4/1/2010 9/1/2009

O R 7/1/2010

$

30,000,000

Pewamo, MI

Simon's Dairy Farm will convert dairy manure and agricultural crop residue into steam that will be sent to Pewamo High School complex located across from the dairy. The project has been approved by the school district to move forward to create a renewable energy resource and to eliminate the odor from the dairy 7/1/2009

7/1/2009

$

4,000,000

Mackinac Island, MI

To develop a state-of-the-art Mackinac Island Waste Energy Center. The biosolid feedstock for the WTE center would utilize the islands current sewer sludge, MSW, food waste, and horse manure to supply "green" power and heat for the island. All "waste" streams that are currently shipped back to the mainland would be eliminated. Any current ordors from the islands "composting" system would be eliminated. 5/1/2009

5/1/2011

$

12,000,000

Woodbridge After School Revitalization project will renovate administrative and program delivery spaces used by Heritage Works and other youth service organizations housed at the Woodbridge Community Youth Center. These rooms include: administration space, activity/craft room, dance studio, flex studio (music and movement), multipurpose room, and computer lab. The goal is to develop safe, efficient and youth-friendly arts and recreation spaces for after-school program participants. Heritage Works serves families with youth ages 5-17 through afterschool programs, weekend programs, and summer activities. Renovations range from cosmetic renovations (e.g., furniture, paint, AV equipment) to infrastructure development in other rooms. Specific renovations include: new lighting, installation of dance floor as well mirrors and bars, new electrical and computer wiring, computer hardware and software, painting, winterizing and installation of new windows, furniture shelving and storage units. 4/25/2009

6/25/2010

$

225,000

A T

s

02262009

t s e

O N

qu

t i m

Detroit

PP

b u S

Woodbridge After School Revitalization Project

e R

Submitted Requests - Not Approved

7/1/2011

D VE 30,000,000

7/1/2009

Route (Infrastructure Only)

6/1/2010

$

d e tt

Heritage Works

Project Description Start Date Clean out of Regional Drain 8/1/2009 Replacement of storm water pump station to protect upstream properties from flooding 8/1/2009 New connection to DWSD water system to provide necessary redundancy and seervice pressures to northern portions of the township 5/1/2009 Sewer Lining/Repair to reduce infilitration and protect ajacent properties against sewe back up 5/1/2009

Expected Completion Date 6/1/2010

7/1/2010

286 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Highland Park School District Highland Park

Project Name

Project Description

Start Date

Highland Park Leadership and Sports Academy Charter School

Highland Park Leadership and Sports Academy (HPLSA) is a charter school to be opened in Highland Park, Michigan with approval to be decided by Central Michigan University on February 20, 2009. HPLSA, in partnership with parents and the community, will provide a safe, motivating, challenging and team-centered environment to inspire academic excellence, to develop leadership skills, and engage students in healthy lifestyles through athletics. HPLSA will reverse the 70% drop-out rate in the city, with a graduation rate of 90% and 75% of our graduates will go on to college. HPLSA will promise 2 years of college tuition upon graduation through scholarships (academic and athletic), financial aid, a proposed endowment and fund raising. No student will be unable to go to college due to lack of finances. HPLSA academics will prepare each student to succeed in college and become a leader in all they do. The Core Knowledge curriculum is proven to get results in urban environments. Our leadership curriculum will ensure that students have the necessary skills for making decisions, managing conflict, developing trust and team work, giving

Water Main extensions to interconnect SE and NW water systems and address arsenic issues. Wardlow Road from Milford Road to Harvey Lake Road.

9/9/2009

11/9/2009

$

1,000,000

2 wells, water treatment plant, 500,000 gallon storage tank and transmission mains

5/1/2009

5/1/2010

$

580,000

Highland Township, Oakland County

transmission main

Highland Township

Highland Township

WTP and Storage

Highland Township Highland Township Highland Township Hillsdale Preparatory School Hillsdale Preparatory School Hillsdale Preparatory School Hillsdale Preparatory School

Hillsdale Preparatory School

5,000,000

$

Highland Township

Highland Township

$

11/1/2009

transmission main

Highland Township

D VE

9/1/2009

T O

Highland Township

S. Milford Road Watermain WWTP

Funding Request

s t s

-N

$ $

Milford Road from M-59 to Rowe 2,450,000 Road 4,150,000

5/1/2010

$

Milford Road from Clyde to Rowe 11,300,000 Road

2 wells, water treatment plant, 500,000 gallon storage tank and transmission mains 5/9/2009 Water Main extensions to serve population of 1200. Milford Road from M-59 to Rowe Road. 5/9/2009

5/10/2009

$

580,000

5/10/2009

$

2,450,000

5/10/2009

$

4,150,000

5/10/2009

$

11,300,000

Water Main extensions to serve population of 1200 300 MGD Wastewater Treatment Facility

e u

q e R

S. Milford Road Sanitary Sewers

300 MGD Wastewater Treatment Facility 5/9/2009 Sanitary Sewers, Pump Station and Force Main to serve population of 2600. S. Milford Road from Clyde to Rowe Road 5/9/2009

Hillsdale

Hillsdale Preparatory School

Repair and upgrade flood prevention systems around school facility.

9/1/2009

$

10,000

Ceiling lighting replacement using GREEN bulb system

9/1/2009

$

5,000

Hillsdale

Hillsdale

02262009

tt i m

d e t

ub

Hillsdale

Hillsdale

WWTP

Hillsdale Preparatory School

S

5/1/2009

5/1/2010 5/1/2010

S. Milford Road Sanitary Sewers

S. Milford Road Watermain

Sanitary Sewers, Pump Station and Force Main to serve population of 2600

5/1/2009 5/1/2009

Highland Township Highland Township, Oakland County Highland Township, Oakland County Highland Township, Oakland County Highland Township, Oakland County

WTP and Storage

9/1/2009

$

20,000

Hillsdale Preparatory School

Update and modernize media equipment in all classrooms to allow for video streaming, connection broadcast systems, projection systems for teachers. Equipment for expanding humanities, arts, and recreation programs to include collapsible risers, playground equipment, etc.

9/1/2009

$

40,000

Hillsdale Preparatory School

To enhance technology with fiber optic connection with local RESD, wireless broadband connectivity, update and modernize 10 year old computer lab, classroom smart boards, updated laptops for teachers. Green standards would be applied.

9/1/2009

$

100,000

Hillsdale Preparatory School

Route (Infrastructure Only)

Wardlow Road from Milford Rd to 1,000,000 Harvey Lake Rd

Highland Township

Highland Township Highland Township

O R

P P A

Water Main extensions to interconnect SE and NW water systems and address arsenic issues

Highland Township Highland Township

Expected Completion Date

Submitted Requests - Not Approved

287 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Hillsdale Preparatory School

Hillsdale

Historical Preservation Society of Dundee/Village of Dundee Dundee, MI

Historical Society of Saginaw County, Inc.

Project Name

Project Description

Start Date

Hillsdale Preparatory School

Replace carpeting and furniture, by GREEN standards, in current facility. Update electrical system and add built in back up generator. Repair entrances to provide security for students/staff. Improve insulation in ceiling, walls, windows, and repair soffits and roof in facility.

Reactivating Hydro-electricity on The River Raisin

Restore the hydroelectric plant that Henry Ford created in Dundee in 1935 and 1936. Rebuild the Leffel Turbine, refurbish GE generator and install the necessary components/controls. The generated electricity then may be used for village electric power needs and/or sold back to the Edison grid. 6/1/2009

Castle Museum Entrance Renovation

The Historical Society of Saginaw County has operated the Castle Museum since 1979. The building, listed on the National Registry of Historic Places, was built in 1897 by the federal government as Saginaw’s main post office. It resembles a French chateau to honor the earliest Europeans settlers to this region. The building is owned by Saginaw County. The museum maintains a collection of over 100,000 donated items, provides permanent and traveling exhibits, offers a full calendar of educational programs and events and maintains an archeological repository and outreach program. The main entrance of the Castle Museum has fallen into significant disrepai creating a negative first impression. It is also not barrier-free for handicapped persons. In 2005, the Museum purchased a portion of a former Jacobson’s department store just across the street for additional exhibit space, library, storage and research services. Its 1960s-era façade does not relate architecturally at all to the main museum and creates confusion in the visitor as we attempt to build a downtown cultural campus and singular identity. The Society has worked with a local architectura4/15/2009

Energy Effiicency Conversion Project

The Detroit Symphony Orchestra uses the Detroit steam system to heat its facility. Due to the age of the system and the increasing costs of steam, many businesses are getting off the system and converting to different sources. This raises the cost for remaining users. Because of this, we are converting to gas heat. This will also make our energy system more energy efficient and cost effective. 1/1/2009

9/1/2009

Funding Request

Route (Infrastructure Only)

$

250,000

$

250,000

9/15/2009

$

650,000 n/a

8/1/2009

$

New pumps and motors and extension of 1400 l.f. of force main to add capacity as is needed due to discharges from expanding industry. Summer 2009

Winter 2009

$

515,000 NA

New pumps and motors and extention of 8000 l.f. of force main to eliminate sewer back ups.

Summer 2009

Winter 2009

$

1,200,000 NA

T O

Saginaw

Expected Completion Date

O R 11/30/2009

D VE

P P A

N s

t s e

qu

History Arts and Libraries

Detroit

Holland Township

Holland Charter Township, Ottawa County Pump Station No. 16 Improvements

Holland Township

Holland Charter Township, Ottawa County Pump Station No. 17 Improvements

Holland Township

Holland Charter Township, Ottawa County, Michigan Pump Station No. 16 Improvements

New pumps and motors and extension of 1400 l.f. of force main to add capacity as is needed due to discharges from expanding industry. Summer 2009

Winter 2009

$

515,000

Holland Township Holland Township

Holland Charter Township, Ottawa County, Michigan Pump Station No. 17 Improvements Holland Charter Twp Pump Station and Force Main

New pumps and motors and extension of 8000 l.f. of force main to elminate sewer back ups Pump Station and Force Main

Summer 2009 2009

Winter 2009 2010

$

1,200,000

Holland Township

Holland Charter Township, Ottawa County Pump Station No. 3 Improvements

New pumps and motors.

Summer 2009

Winter 2009

$

135,000 NA

Holland Township

Holland Charter Township, Ottawa County Pump Station No. 23 Improvements

New pumps and 5600 l.f. of 12" forcemain needed for added capacity and a corrossion issue in the existing main.

Spring 2009

Fall 2009

$

835,000 NA

Holland Township

Holland Charter Township, Lakewood Blvd. Water Transmission Main Ottawa County Replacement

8200 l.f. of 20" and 11,000 l.f. of 16" transmission replacement. Needed as the existing main is starting to require repairs due to corrossion.

Summer 2009

Fall 2009

$

4,200,000 NA

tt i m

d e t

b u S

02262009

e R

Submitted Requests - Not Approved

1,600,000

Yes

288 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Holland Township

Holland Charter Township, Ottawa County Eric Stret Sanitary Sewer

250 l.f. of 8" sanitary sewer for homes on septic systems.

Holland Township

Holland Charter Township, Ottawa County Water Supply Booster Station Air handler

Needs replacement to maintain air quality so as to minimize corrossion at the station. Summer 2009

Summer 2009

$

70,000 NA

Holland Township

Holland Charter Township, Corrosion Protection for Wastewater Pump Ottawa County Stations

Add impressed current systems to 12 waste water pumping stations as the current anode systems are not working.

Spring 2009

Summer 2009

$

110,000 NA

Holland Township

Holland Charter Township, Ottawa County 144th Avenue Water Main

1600 l.f. of 12" water main needed for system reliability and to loop dead ends

Spring 2009

Summer 2009

$

130,000 NA

Holland Township

Holland Charter Township, Ottawa County Repainting Lakewood Blvd. Tank

To maintain the tank from corrossion.

Summer 2009

Summer 2009

$

175,000 NA

Holland Township

Holland Charter Township, Ottawa County 104th Avenue Sanitary Sewer

1700 l.f. of 12" sanitary sewer for a proposed school and future improvements.

Spring 2009

Summer 2009

$

255,000 NA

Holland Township

Holland Charter Township, Ottawa County Adams Street Water Transmission Main

3000 l.f. of 16" water main needed for system reliability and to loop dead ends

Spring 2009

Fall 2009

$

520,000 NA

Holland Township

Holland Charter Township, Ottawa County Pump Station No. 31 Improvements

New pump station and 5400 l.f. of 16" force main needed to add capacity for an expanding industry in the area.

Spring 2009

Fall 2009

$

1,500,000 NA

Holland Township

Holland Charter Township, Ottawa County Water Service Replacement

Replacement of neatrly 6000 water services. (Currently polybutlene to be replaced with cooper.)

Spring 2009

Fall 2009

$

6,600,000 NA

Holland Township

Holland Charter Township, Ottawa County, Michigan Pump Station No. 3 Improvements

New pumps and motors.

Summer 2009

Winter 2009

$

135,000

Holland Township

Holland Charter Township, Ottawa County, Michigan Pump Station No. 23 Improvements

New pumps and 5600 l.f. of 12" forcemain needed for added capacity and a corrossion issue in the existing main.

Spring 2009

Fall 2009

$

835,000

Holland Township

Holland Charter Township, Lakewood Blvd Water Transmission Main Ottawa County, Michigan Replacement

8200 l.f. of 20" and 11,000 l.f. of 16" transmission replacement. Needed as the existing main is starting to require repairs due to corrossion.

Summer 2009

Fall 2009

$

4,200,000

Holland Township

Holland Charter Township, Ottawa County, Michigan Eric Court Sanitary Sewer

250 l.f. of 8" sanitary sewer for homes on septic systems.

Spring 2009

Summer 2009

$

45,000

Holland Township

Holland Charter Township, Ottawa County, Michigan Water Supply Booster Station Air Handler

Needs replacement to maintain air quality so as to minimize corrosion at the station.

Summer 2009

Summer 2009

$

70,000

Holland Township

Holland Charter Township, Corrosion Protection for Wastewater Pump Ottawa County, Michigan Stations

Add impressed current systems to 12 waste water pumping stations as the current anode systems are not working.

Spring 2009

Summer 2009

$

110,000

Holland Township

Holland Charter Township, Ottawa County, Michigan 144th Avenue Water Main

1600 l.f. of 12" water main needed for system reliability and to loop dead ends.

Spring 2009

Summer 2009

$

130,000

Holland Township

Holland Charter Township, Ottawa County, Michigan Repainting Lakewood Blvd Tank

To maintain the tank from corrossion.

Summer 2009

Summer 2009

$

175,000

Holland Township

Holland Charter Township, Ottawa County, Michigan 104th Avenue Sanitary Sewer

1700 l.f. of 12" sanitary sewer for a proposed school and future developments.

Spring 2009

Summer 2009

$

255,000

d e tt

t i m

ub

S

02262009

Spring 2009

T O

q e R

N s

Submitted Requests - Not Approved

O R

P P A

st

e u

Summer 2009

$

45,000 NA

D VE

289 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Holland Township

Holland Charter Township, Ottawa County, Michigan Adams Street Water Transmission Main

3000 l.f. of 16" water main needed for system reliability and to loop dead ends.

Spring 2009

Fall 2009

Holland Township

Holland Charter Township, Ottawa County, Michigan Pump Station No. 31 Improvements

New pump station and 5400 l.f. of 16" force main needed to add capacity for an expanding industry in the area.

Spring 2009

Fall 2009

Holland Township

Holland Charter Township, Ottawa County, Michigan Water Service Replacement

Replacement of nearly 6000 water services. (Currently polybutylene to be replaced with copper.)

Spring 2009

Fall 2009

Holy Cross Children's Services Saginaw/Spaulding

Funding Request

$

520,000

D VE $

1,500,000

$

6,600,000

8/30/2009

$

700,000

O R

P P A

Holy Cross Children's Services Queen of Angels Educational facility and gymnasium

The Queen of Angels facility in Saginaw provides residential treatment services for 60 male adolescents referred by county courts or the Michigan Department of Human Services. Average length of stay is between six and nine months, during which time focus is treatment, education and skill development to assist in successful community living once treatment is completed. A critical focus of placement is education, in that most of these youth lag significantly behind their peers in school credits because of their life situations. Currently, Queen of Angels has no educational facilities and the clients are bussed to another facility which is now beyond capacity. The current facility also lacks a gym, making physical education and recreation impossible. For our clients, a physical outlet is critical in supporting treatment progress. This project would create four classrooms and a gymnasium on the campus that the clients reside on, reducing transportation costs, related staff costs and eliminating the overcrowding at the current educational site used. These improvements enhance existing services a3/1/2009

Houghton County Corrections Facility

Houghton County is seeking funding for the construction of a new facility to house the Houghton County Jail, County Work Camp, Sheriff's Department and 97th District Court. Current operations are now housed at three separate locations. Two recent studies have concluded that the current jail facility is inadequate and that a new one should be built. Combining the operations under one roof will lead to greater security for County employees and guests and to a more efficient use of current man power and will result in reduced maintenance, heating and energy costs by replacing structures built in the 1950's and 60's. 6/1/2009

2/1/2010

$

11,000,000

This project would complete 1,500 feet of a water main loop through the Houghton County Memorial Airport Industrial Park and rehabilitate the system's 500,000 gallon water tank. Completion of the system would allow for for the development of additiona lots in the Park and on the Airport's property. 5/1/2009

10/1/2009

$

720,000

Houghton County Memorial Airport Terminal

The Houghton County Memorial Airport wishes to replace its current terminal which was built in 1972. A new structure is desired to provide space for future growth, comply with current safety measures implemented since September 11, replace mechanical systems that have exceeded their useful life, and to provide for better passenger security and flow.

6/1/2010

$

18,000,000

Houghton County Transfer Station

Houghton County is seeking to replace its Transfer Station due to structural issues with the current facility. The new structure is designed to allow for better access which will reduce waiting times for both municipal and private customers. 6/1/2009

12/1/2009

$

1,000,000

Water system improvements

Repair 71 year old municipal water system/ replace water storage tank

6/1/2009

8/1/2009

$

40,000

Bridge Restoration Project

Repair former vehicle bridge for foot traffic New windows/ wall and ceiling insulation/ and energy efficient furnace for township hall built in the 1890's

5/1/2009

$

40,000

$

45,000

T O

Route (Infrastructure Only)

N s

t s e

Houghton County

Houghton County

City of Houghton

e t t

it

Houghton County

Houghton County Houghton Township Houghton Township Houghton Township

m b u

Franklin Township

S

Portage Township Eagle River MI---Houghton Township Eagle River MI---Houghton Township Eagle River MI---------Houghton Township

02262009

R d

Houghton County Memorial Airport Industrial Park Water Main

Franklin Township

u q e

Township hall renovation/improvement

Submitted Requests - Not Approved

6/1/2009

2/16/2009

3/15/2009

290 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Houghton Township, Houghton Township Houghton County Houghton Township, Houghton Township Keewanaw County Houghton Township, Houghton Township Keewanaw County Howell Historic Society Howell City

Hurley Medical Center Flint

Project Name Water system improvements

Project Description

Start Date

Expected Completion Date

Funding Request

Repair 71 year old municipal water system/ replace water storage tank New windows/ wall and ceiling insulation/ and energy efficient furnace for township hall built in the 1890's

6/1/2009

8/9/2009

$

40,000

2/16/2009

$

45,000

5/1/2009

$

40,000

Historic Depot Rennovation

Repair former vehicle bridge for foot traffic Exterior renovations of the 1880’s Depot, including repointing the bricks, replacing rotted wood facia, trim and doors and painting

3/15/2009 One month after start

6/9/2009

10/10/2009

Emergency Department/Trauma Center Expansion

To meet the growing demand for emergency services from unemployed, uninsured, children who require our specialized Pediatric Emergency Department care and others, Hurley Medical Center is renovating and expanding its Emergency Department/Trauma Center. Originally designed to treat 55,000 patients annually, Hurley's ED (Emergency Department) now sees 76,000 visits per year. As the only Level 1 Trauma Center in the region, Hurley provides ready access to the highest level of emergency care available to people in mid-Michigan. Patients also include uninsured who resort to the ED as their only source of health care, automobile accident victims transported from the state's I-75 highway and patients undergoing evaluation for involuntary admission for inpatient psychiatric care. The ED is also the tri-county region's center for disaster preparedness and the designated hospital to provide emergency care for the U.S. President while in our area. Preliminary bids and designs began in 2008 for this "shovel-ready" project that will be completed by 2011. The ED presently occupies 28,531 square feet. Renovations include provisions for obt8/1/2009

12/31/2011

$

40,000,000

Hurley Medical Center is located in Census Tract 15 which is designated by the Federal Government as a Health Professional Shortage Area. Presently, Hurley Medical Center does not qualify for the National Health Services Corp Program. A depressed economy, loss of jobs, increase in uninsured and Flint’s declining population has made the recruitment of primary care physicians difficult. As a safety net hospital, located in an urban setting with an affiliation with Michigan State University College of Human Medicine, Hurley residency training programs provide the poor and uninsured patients access to primary care physicians in outpatient clinics and inpatient units. Nearly 57% of Hurley’s patients are Medicaid. Hurley incurs over $55 million of uncompensated care annually. Hurley Medical Center is requesting $1,000 to attract/retain primary care physicians through the National Health Corps Program. Scholarships would be prioritized for medical students from Michigan State University College of Human Medicine who lived or had some roots within Genesee County. Local universities ( Kettering University and University of Michigan-Flint) woul 7/1/2009

6/30/2011

$

1,000,000

A collaborative effort is underway between Hurley Medical Center, McLaren Regional Medical Center, Genesys Regional Medical Center, Kettering University , Hamilton Health Network and Michigan State University College of Human Medicine to establish a School of Public Health in Flint. A curriculum will be designed to focus on specific areas of need for county residents. Genesee County has a severely depressed economy with concomitant high rates of infant mortality, syphilis, HIV, STI (sexually transmitted illness) and a disproportionate burden of chronic disease and its complications. Scientific research by faculty and students would focus on improving the health care of the community by studying and instituting a systematic approach to treating chronic illness and preventing disease. This would ultimately reduce health care costs as well as improve the health status of the population. The development of a School of Public Health would create an opportunity to conduct a wide variety of studies that would lead to innovative solutions and to a decline in preventable and chronic disease in our community and beyond. The initiation of this school will result in7/1/2009

6/10/2009

$

3,500,000

Township hall renovation/improvement Bridge Restoration Project

T O

s t s

O R

D VE

Route (Infrastructure Only)

P P A

-N

e u

d e tt

Hurley Medical Center Flint

t i m

b u S Hurley Medical Center Flint

02262009

School of Public Health

q e R

Submitted Requests - Not Approved

291 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Hurley Medical Center Flint

Project Name

Project Description

Start Date

Expected Completion Date

Care Navigator for Depression

Most care for depression occurs in primary health care settings, where physicians struggle to identify and treat mood disorders under the twin constraints of limited resources and competing demands. However, initiatives through the University of Michigan Depression Center (MDOCC) and the DIAMOND project in Minnesota shows promise in helping primary care physicians in treating depression through the use of Care Navigators. Outcomes based research has led to an interest in extending this model on a community-wide basis. Benefits include greater access to care for underserved populations who are known to have increased prevalence of depression, fewer emergency room visits for depression related episodes, and a decreased demand on shrinking psychiatric resources. Care Navigators have been used in support of many other disease management programs. This project seeks to direct this model to the increasing epidemic of depression occurring in our culture. Funding of this project is estimated at $200,000 and, within 180 days of being funded, would create a Care Navigator system in support of Hurley Medical Center’s primary care ph 6/1/2009

Create Jobs With Clean, Efficient, American Energy

To improve our energy efficiency, Hurley Medical Center will contract with a Michiganbased engineering firm to conduct an energy audit/operational evaluation that will be completed by April 30, 2009. As a 443-bed teaching hospital and safety net provider in Flint, Hurley provides over 66% of the region’s uncompensated care, costing $55 million annually. The hospital on the main campus covers 1 million square feet with the oldest building being built in 1927 and the newest building in 1979. The engineer’s firs stage recommendations will include measures to reduce energy consumption associated with heating and ventilation systems, lighting and water systems, etc. Energy cost saving measures, such as fuel switching, on-site generation, utility bill auditing, utility rate changes, and distribution upgrade will also be recommended. The engineers will provide training of hospital maintenance workers to implement the new preventive maintenance procedures required for energy efficiency. Such training will promote greater awareness and personal responsibility for energy conservation to all hospital occupants. Hurley will select the specific measures that will be cost-detailed a1/16/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

12/31/2009

$

200,000

7/1/2010

$

16,000,000

7/1/2011

$

35,000,000

N s

Hurley Medical Center Flint

d e tt

t i m

Health Information Technology - Clinical Information System/ Electronic Medical Record

ub

Hurley Medical Center Flint

t s e

qu

e R

Hurley Medical Center is a 443 bed public, non-profit, teaching medical center in Flint, Michigan. Hurley has a legacy clinical information system that is 20 years old. The current system is used to its fullest capacity, however, current system capabilities cannot meet the functionality required to meet patient safety and quality improvement goals available in a state-of-the-art clinical information system. Hurley has completed a clinical system selection process and identified a preferred vendor. The primary goals of a new clinical information system are to: 1) provide clinical decision support to clinicians with rules (evidence-based clinical guidelines) and alerts (drug interaction allergies, etc.) that will improve patient safety and quality of care; 2) improved CPOE (computerized physician order entry) capabilities to increase physician use. Increased CPOE can improve patient safety by eliminating handwriting illegibility and providing decision support alerts as orders are entered. Quality of care improves through the reduced turnaround time from order to treatment; 3) provide a comprehensive electron9/1/2009

S 02262009

Submitted Requests - Not Approved

292 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Hurley Medical Center Flint

Mobile Health Unit

Between 1998 and 2007 uninsured Michigan adults grew by more than half (9.3% to 14.4%). Adults without health care coverage are less likely to access health care and are more likely to delay getting needed care. Data shows that persons without health care coverage are also more likely to be physically inactive and smoke. Growing numbers of Michigan residents are underinsured, which means their health care insurance coverage is not sufficient to meet their needs. Studies have shown that the underinsured are nearly as likely as uninsured adults to go without needed medical care to not incur medical debt. Rural counties have higher crude death rates, and reflect the overall burden of disease and death on a community as well as a need for health care resources to address these issues. Rural areas are geographically distant from health care providers. Many older adults tend to live in Michigan’s rural areas when compared with urban areas. We are proposing a mobile health unit that can provide access to health care and services in the outlying communities that HMC serves. This mobile unit would be staffed to screen, handle or stabilize an emergent h 7/1/2009

Huron Academy

Sterling Heights

New Huron School

Construction of a new upper elementary public charter school in Macomb County

Huron County Drain Commission

Huron County, Michigan; Begins at the New River in Sec.18 of Huron Twp. Then travels westerly approx. 1.5 miles and ends in Sec. 13 of Dwight Twp. Existing and proposed branches extend southerly to the north edge of Sec. 24 in Dwight Twp. And Sec. 19 in Arnott and Branch County Drain

Huron County Drain Commission

Huron County, Michigan; The Bad Axe Drain Phase III would begin at the Bad Axe Drain and travel several hundred feet west to Cleveland Street extended then south along Cleveland St. to M-53, West Huron Avenue. Located within Colfax Twp., Sections 13/24 a Bad Axe County Drain Phase III

d e tt

t i m

ub

Expected Completion Date

P P A

O R

Funding Request

D VE

6/30/2010

$

750,000

8/1/2010

$

6,000,000

Flood Relief for Agricultural Land Clean sediment out of existing channel to restore original design capicities Install new road and driveway culverts with proper size and grade Install appropriate erosion control facilities Sept. 2009

Jun. 2010

$

210,000

Flood Relief for State Highway & City Construct a relief drain along Cleveland St. that will properly drain Cleveland St. and provide drainage outlet for West Huron Avenue (M-53). MDOT has plans to reconstruct West Huron Ave. (M-53) but cannot proceed without proper drainage outlet (Bad Axe Drain Phase III). The project would include: 1,300 feet of open channel 3,300 feet storm sewer Relocate sanitary sewer Restore Cleveland Street Appropriate Soil Erosion Control Measures Sept. 2009

Nov. 2010

$

1,360,000

T O

11/1/2009

Route (Infrastructure Only)

N s

t s e

qu

e R

S 02262009

Submitted Requests - Not Approved

293 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Huron County Drain Commission

Huron County, Michigan; The Betty Drain begins at the north end of Larned Rd. at Saginaw Bay and travels south along Larned Rd. 1,900' with branches along Cove Drive and behind houses on east side of Larned Rd. Located along the west edge of the Village Betty and Branches County Drain

Huron County Drain Commission Huron County EDC

Huron County, Michigan; The Gallup Drain begins at Saginaw Bay approximately 600' north of the intersection of Spring Street (M-25) and Sand Rd. in the Village of Port Austin and travels south to Spring Street (M25), southwest along Sand Road, southeast Gallup County Drain Bad Axe Bad Axe Small Business Incubator

Start Date

Expected Completion Date

Flood Relief for Township & Village Construct a properly sized storm sewer system along Larned Rd. and Cove Drive. The project would include 3,500 feet of storm sewer (12" to 24" diameter) Appropriate Soil Erosion Control Measures

PP

O R

Jun. 2009

Funding Request

D VE

Nov. 2009

$

465,000

Flood Relief for Village Construct 1,200 feet of new 36" outfall sewer to replace badly decayed 24" sewer Increase pump size at pump station and install new controls Restore Park and Streets Appropriate Soil Erosion Control Measures Sept. 2009 7/9/2009

Aug. 2010 7/10/2009

$ $

460,000 2,800,000

Manufacturing/Art is a manufacturing diversification and creative economy project designed to integrate Michigan’s art and design schools with the state’s vast manufacturing base. In order for Michigan to successfully compete and remain competitive a new relationship must be forged between our state’s creative talent (i.e. designers, artists, artisans, and creative individuals) and local manufacturers toward development of new opportunities, businesses, products and jobs. The project is to establish access; an easy, but structured, method for local manufacturers to contact and interact with creative talent and ultimately produce products for the global marketplace. Based on research, we believe that there is a strong market for locally designed and locally manufactured, “boutique” products, (furniture, environmental/green etc..) and move away from mass-merchandised goods. The second part of our work is the engagement of the state’s design schools to encourage more interaction between students and manufacturers to showcase creative talent and innovative product design and development. Michigan’s research universities have ca 3/1/2009

2/1/2010

$

350,000

A T

s

t s e

Route (Infrastructure Only)

O N

u q e

R d

Huron County EDC

Huron County

ub

i m

e t tt

Mfg. Art

S 02262009

Submitted Requests - Not Approved

294 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Huron County EDC

Port Austin

Project Name

Project Description

Start Date

Expected Completion Date

Port Austin Farm Market Roof

The Port Austin Famers Market is considered to be one of the top ten markets in the State of Michigan. During an average weekend, the market will bring 3,000 visitors to the community and on holiday weekends the market will generate over 10,000 unique visitors. This vibrant market links locally grown produce and the farmers that grow it with end consumers who are looking for the freshest produce available. In addition, the market provides a dynamic venue for local artisans who use the market to build name recognition and add to their incomes. The market has shown substantial growth over the past several years, topping out last year with over 200 vendors. The proposed project would construct a permanent cover over the market area to provide shelter to the patrons and vendors from the weather. In addition, the roof structure would allow the market to expand the number of days it would be open as well as offering other types of activities to the community, such as arts festivals, car shows, local entertainment, dances etc… The proposal calls for the construction of the permanent roof structure, installation of small scale wind turbines and photovoltaic sys5/1/2009

Port Austin Creative Incubator

P P A

O R

Funding Request

D VE

12/9/2009

$

2,100,000

The project is to adaptively reuse a closed gymnasium. The Village could not afford the cost of utilities to the building which has been used as a community activity center and so, closed the building in the fall of 2008. Being a small waterfront community the Village is seeking new and creative ways to grow their economy. They are currently home to one of the top ten farm markets in Michigan, an active community theater and the Thumb Arts Guild and its annual Labor Day Arts festival. The project would take the existing gym and convert it into an arts incubator, focused on developing new arts related businesses. In addition, the project would include space for post-production space for digital media, flexible office space, conference facilities etc… One key aspect of the adaptive reuse of the building is the utilization of new technologies for utilities. The Village is planning on a green roof, geo-thermal heating and cooling system, small scale wind turbines as well as solar cells for electrical generation. In addition, every attempt will be made to utilize locally sourced materials to reduce the b5/1/2009

5/1/2010

$

1,400,000

The proposed project would build a multitenant building on property that the village owns on the community’s main street. The building would provide low cost space and technical support services for small and start up retail businesses that need space and an opportunity to test their business concept. This space would be flexible in nature, allowing the interior spaces to be reconfigured on an as needed basis. The intent is to quickly grow small retail businesses, which will then move into larger space in the community. The project will cement the community as a dynamic retail hub in this waterfront community. A second part of the project is project is the inclusion of the village’s public library in the development. The library has outgrown its current space and has struggled with finding more space. This project would use the library as the anchor/hub of the development pulling patrons past the retail establishments creating a constant stream of potential retail customers for the retailers in the development. The library would also offer a collection of information for small business development 8/9/2009

8/10/2009

$

2,500,000

Nov. 2010

$

850,000

T O

Route (Infrastructure Only)

N s

Huron County EDC

Port Austin

t s e

u q e

R d

Huron County EDC

Port Austin

e t tt

i m

b u S

Port Austin Library/Retail Hub

Huron County Parks

Village of Caseville, Huron County, Michigan Caseville Park Beach Development

Improve Access to Saginaw Bay 1000' Beach Promenade Vehicular Access & Parking Restroom Facilities Playground Equipment Picnic Facilities, Shelters & Furnishings Gateway Pavilion

Huron County Parks

Village of Caseville, Huron County, Michigan Caseville County Park Sewer Extension

Enhance Camping Facilities Along Saginaw Bay 14 electrical pedestals with 50 amp hookup 14 sewer hookups to existing campsites landscaping 1000' of 6 sewer main Jun. 2009

Nov. 2009

$

40,000

Huron County Parks

Village of Port Hope, Huron County, Michigan

Preserve Historic Chimney Restore brick and motar at chimney top Repair stone foundation and braces

Nov. 2009

$

19,000

02262009

Stafford County Park Historical Chimney Restoration

Submitted Requests - Not Approved

Sept. 2009

Jun. 2009

295 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Huron County Parks

Village of Sebewaing, Huron County, Michigan

Huron County Road Commission

City of Bad Axe & Colfax Townshp, Huron County, Michigan Engine Shop Expansion

Image & Arts Council of Troy Image & Arts Council of Troy

Image & Arts Council of Troy Image & Arts Council of Troy

Image & Arts Council of Troy

Sebewaing County Park Pedestrian Bridge and Fishing Access

Start Date

Improve Access to Saginaw Bay Construct a 100' long by 8' wide footbridge 2 - 10' x 20' floating fishing/viewing platforms Access trails to and from the parking lot Picnic tables 300' of crushed compacted limestone pathway Jun. 2009

329,000

$

500,000

Not Sure

$

6,000,000

July, 2009

$

9,000

June, 2009

$

25,000

9/9/2009

$

30,000

Create two part time positons to expand the Troy Arts Council. The Executive Director would have the strategic overview, marketing and community interface. The Membership Coordinator would maintain the database, send out email updates and look for creative ways to bring in additional members. The Image & Arts Council of Troy wants to encourage membership in all areas of creative arts not just graphic arts. Estimated cost $3,000 per month February, 2009

None - On going

$

36,000

Iner-G, Inc will refurbish a dilapidated structure within the city, known to be a community eye sore, and transform it into Southeastern Michigan’s first and only state of-the art alternative energy facility. The building will be renovated by Iner-G, partner companies (Habitat for Humanity Michigan, Motor City Blight Busters, Hardin Geotechnologies, etc.), individuals who have completed the Iner-G Training and Certification Program for Green Building and Geothermal Technology, and other organizations in the alternative energy industry. This three phase redevelopment project will take place over an eighteen month period of time. This rehabilitated green building will be a structure where individuals can come to learn about the benefits of green/alternative energy with a major focus on geothermal energy and its concepts and applications. It will also serve as a central place where the public, research organizations, educational institutions, corporations, and the like can come together to share information and link green industry research and development to practical job standards and training curricula. As a training institute where people can April, 2009

October, 2010

$

2,250,000

Improve Road Commission Efficiency Existing Road Commission repair facilities are in two buildings, one built around 1960 and the other around 1920. The buildings are on two different sides of a public street. Proposed expansion would expand and update the existing 1960 building to current standards. Jun. 2009

Troy, Michigan

Troy, Michigan

Documentary film video about Yamasaki Building in Troy Michigan - the building wher the Plans and the original "mock up" for the world trade center" was created. This building was close to being demolished a few years ago -but is now again on the auction block. Interviews with architects, photographers and art historians about the Yamasaki Building, its history and why it deserves recognition. Program will be broad Documenatary Film: Building that gave birth to cast on local cable TV - would like to be able to produce a video that could also be the World Trade Center shown on public broadcasting. (See also 4 PDF Files attached) Feb, 2009

Troy, Michigan

Troy, Michigan

Troy, Michigan

Detroit

02262009

Nov. 2009

T O

O R

P P A

N s

t s e

u q e

Troy has begun a trails and pathways project. Goal is to provide art along the pathways, at meeting points and at trail heads. Art would be 3-D sculptural objects that would be created by local artists /artisans.

Art for Troy Trails and Pathways

March, 2009

R d

e t tt

Executive Director and Membership Coordinator

i m

Green Alternative Energy Learning Center

Funding Request

$

The original HQ building of architect Minoru Yamasaki is currently up for sale. New owners may tear it down and rebuild because the 5 acre property is very valuable. Yamasaki was the architect of the World Trade Center and this building is the location where the original WTC "mock up" was created. Artists are currently using part of this building. Several symposiums about the history of this building were held over a 4 yea period (pdf's attached). We propose an Arts and Conference Center which would bring art and busines together under the same roof, provide on-going jobs, save a Purchase of the Historic Yamasaki building for historic landmark and also be self-supporting going into the future. The property is probably a good value at this time. Feb, 2009 Arts & Conference Center Public Art Mural at Niles Continuing Education Public Beautification mural to reflect the cultural diversity of the attendees of the Niles Center Continuing Education Center in Troy, Michigan March, 2009

b u S Iner-G, Inc.

Project Description

Expected Completion Date

Submitted Requests - Not Approved

Nov. 2009

D VE

Route (Infrastructure Only)

296 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Iner-G, Inc.

Southeastern Michigan

Project Name

Project Description

Start Date

Fundamentals of Geothermal Workforce Employment & Training

Iner-G, Inc will conduct training courses that will give participants an overall fundamental understanding of the Geothermal Heating & Cooling Industry and its applications within residential, commercial, and mixed-use structures. Our target population for this training will be individuals in low income and economically distressed communities. This population includes but is not limited to veterans, displaced workers, at-risk youth and young adults, ex-offenders (those with criminal records/backgrounds), low-income (those on public assistance and below the poverty line), and other unemployed persons. Additional skill training courses will be provided for those interested in job specific training such as HVAC Installers, Pipe Fitters & Plumbers, Design Engineers, Electricians, Drillers, Architects, and other related fields within the industry. Upon completion of the training, participants will receive Iner-G Geothermal Certification which gives them the fundamental competency to test for nationally recognized certification programs as well as a customized skill-set within the aforementioned fields. Training this population for careers in an emerging renewable April, 2009

Inland Township

1,000,000

HUD housing retrofit

Iner-G, Inc. has devised a comprehensive solution to the current rising energy cost environment for non-profits organizations, state and local government entities, and community development corporations by retrofitting properties designated for lowincome residents. Retrofitting structures with geothermal heating and cooling systems will in most cases completely eliminate the gas portion of utility spending, thus decreasing overall utility spending by more than 50%. We believe that you can’t truly have affordable housing if the utility portion of residential living isn’t addressed and reduced. By drastically reducing the utility spending, housing turnover will decrease, community organizations will be more economically viable, resources for utility assistance programs can be reduced and reallocated, homes will be less toxic, facility maintenance cost will decline, and low-income residents will truly live in affordable housing. Individuals who have completed the Iner-G Certification will be used as HVAC Installers, Plumbers, Design Engineers, Drillers, etc. on the retrofit of these properties from gas forced air, radiant, and stream systems to geothermal heatinApril, 2009

Ongoing

$

1,500,000

Fire Station Project

Construct a fire station and equip it. Approx. size 44' X 66' pole construction

Oct. 1, 2009

$

200,000 NA

Flint

10/1/2009

$

500,000

02262009

t i m

S

ub

t s e

O N

qu

d e tt

Insight Management and Consulting Services, Inc.

D VE $

s

Southeastern Michigan Inland Township, Benzie County

PP

O R

Funding Request

Route (Infrastructure Only)

Ongoing

A T

Iner-G, Inc.

Expected Completion Date

Michigan area Neuroscience Science Fair

e R

5/1/2009

It is our proposal to hold an elite Neuroscience Science Fair at IINN, which would focus on the clinical and basic Neurosciences to develop interest in research in areas of the brain, spinal cord, cognitive sciences, philosophical sciences related to mind research. This would be held at a state wide level and would require to provide awards and scholarships for those who succeed. These students will be able to enter into this particular contest along with other science fairs as well but the idea would be that this would be a preeminent display of the neurosciences for high school students across the country. We would like to see competitors come in from all over the United States to help rejuvenate the area in terms of economic stimulus. It would also open Flint up as a corridor into the study of the neurosciences for students. As we continue to develop a research feel for the city of Flint, we believe we will position ourselves for a brighter future. 4/1/2009

Submitted Requests - Not Approved

297 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Insight Management and Consulting Services, Inc.

Flint

Project Name

Project Description

Start Date

Paperless Software System

The Insight Management Company has positioned itself to help Physicians offices and medical facilities to transition into paperless systems, known as Electronic Medical Records (EMR). The paperless system includes research tools that allow easier and more efficient ways that outcomes can be measured and followed by Physicians and their staff as well better management of medical records. This is a very important project for Flint as the Federal Government has mandated a switch into EMR for a variety of reasons. We currently have a relationship with eClinical Works, which is a corporation that we believe to be one of the best EMR application systems in the country. This software also offers a practice management system, which will help facilitate better patient care. This project would require a significant amount of capital to help develop this system throughout the area. Flint has huge Physician community which creates a great market for this to occur with the right infusion of capital we would be able to assist offices transition into this. This will be a very sustainable project that will require the need for continued surveillance in order to continue better m4/1/2009

Neuro Rehab Unit

We would like to establish a Neuro Rehab Unit, in which will be a state of the art facility which would allow for patients who suffer brain injury, either through trauma or stroke, or through brain diseases or illnesses. These patients need a fully developed rehab unit to meet the unique and specific needs to produce the best possible outcome. We believe such an Institute should have research capabilities to look at the variety of outcome measures to ensure that we are actually improving the quality of our patient’s lives. Currently in the greater Flint area, we do not have a facility that offers the full gamut of treatment, including neuro-psychology, psychiatry, neurosurgery, rehab, physical and occupational therapy and a variety of other modalities. By establishing such a unit in an area which is densely populated with Physician, we believe we will have a sustainable model for a much needed services. This facility will also generate jobs in the area. This plan is multi-faceted in terms in its effect on the area and certainly will enhance the areas feel for science and technology.4/1/2009

A T

Insight Management and Consulting Services, Inc.

Flint

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2009

$

1,000,000

10/1/2009

$

2,000,000

10/1/2009

$

2,000,000

O N

u q e

Insight Institute of Neurosurgery and Neuroscience (IINN) is a an Institute set up in an impoveraged area with the intent of introducing a high level research facility that delivers clinical medicine, basic science and technology related research with the added goal of stimulating the economy in this region. We are attempting to do our share of introducing our ideas into an underprivileged area and have been working extensively with Dan Kildee, who has been very helpful with our revitalization project(s). As an Institute, we would like to apply for funds to help establish a Spinal Cord Stimulator, Neuromodulation Research Center. We are involved currently in the utilization of a device which is implanted directly into patients to help decrease the amount of pain they are feeling from a variety of elements. This device specifically interrupts the pain signal to the brain and instead produces a pleasant sensation in the painful area. Currently, we have reached a point where we are implanting a large number of devices and exceed almost anyone else in the country. At this point, we have embarked on research in which we will implant the device, which is already FDA 4/1/2009

R d

Insight Management and Consulting Services, Inc.

Flint

02262009

b u S

i m

e t tt

Spinal Cord Stimulation

Submitted Requests - Not Approved

298 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Insight Management and Consulting Services, Inc.

Project Name

Project Description

Start Date

Scar Tissue Project

Prevention of scar tissue formation in spine surgery is a very important topic that needs more research. We have a novel technology which is currently not used anywhere else and are planning to implant in animals to study whether it is successful in reducing scar tissue formation. Scar tissue formation is one of the problems of spinal surgeries and can lead to residual problems and is one of the major issues that have been unable to be tackled. Until today one other product was utilized, the produc that we have has already been trialed in humans for other applications in other areas of the body; therefore we feel this is an extremely strong candidate for successfully reducing scar tissue formation. We would need laboratory facilities to allow for research. We would also need the capital to pay science students hired from the Flint area who will be able to man the laboratories and do the research required to prove successful results in animal models. Once that is accomplished, we will transition into human trials and if that ultimately succeeds we believe Flint would be well positioned to become a supplier of the technology in the future. This will then help rejuvenate the 4/1/2009

Flint

Closed Head Injury

This proposal is in regards to a Closed Head Injury Research initiative that has been currently unstudied in the country. Closed head injury, brain injury and brain trauma is a huge issue, as it has cost millions of dollars as well as loss of human life across our nation. Currently the databases that are used to study the effect of a variety of treatments and interventions are sorely lacking. The last major med-analysis and reviews of the literature produced a low level class three evidence for most interventions. Class one evidence for treatments were almost non-existent. One of the main problems is the way that the data is gathered. IINN is proposing to develop a database where every known interventional parameter, as well as data point can be incorporated into one database, such that we will be able to objectively study the effects of interventions. For example, if we were to increase the oxygen level of the brain, at what threshold would we be hurting the patient and/or what threshold would we be significantly adding to the patients care. This topic proposes a variety of questions of this nature that are clearly unanswered. By developing a database that ca4/1/2009

Flint

Glioblastoma Multiforme (GBM) is an incurable primary brain tumor. It remains a great challenge for neurosurgeons and oncologist alike. Surgical resection in addition to radiation prolongs life to approximately 12-18 months. Radioresistance of the these tumors pose an obstacle to treatment. Recently, COX-2 inhibitors have been shown to increase the sensitivity of GBM to radiation, in vitro. The radioresistant cell line had greater expression of COX-2 than did the radiosensitive cell line, as per immunofluorescence histochemistry. Western blot analysis confirmed this finding. Statistical analysis (Bonferroni/Dunn) showed the results to be significant. The wells containing radioresistant cells exposed to incremental doses of radiation and COX-2 inhibitors appeared to have higher cell kill when compared to radiation alone. Furthermore, increasing the COX-2 inhibitor concentration yielded higher cel.l We propose a randomized double blind clinical study to test the hypothesis that patients Radiosensitizaton of Glioblastoma Multiforme with GBM treated with COX-2 inhibitors, prior to whole brain or stereotactic radiation, will have enhanced sensitivity to radiation. COX-2 inhibition may lower the required do4/1/2009 with COX-2 Inhibitors

Flint

A T

Insight Management and Consulting Services, Inc.

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2009

$

2,000,000

10/1/2009

$

3,000,000

10/1/2009

$

4,000,000

O N

u q e

R d

Insight Management and Consulting Services, Inc.

02262009

e t tt

b u S

i m

Submitted Requests - Not Approved

299 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Insight Management and Consulting Services, Inc.

Insight Management and Consulting Services, Inc.

Insight Management and Consulting Services, Inc.

Flint

Flint

Project Name

Project Description

Start Date

Expected Completion Date

Genesee Academy - Education Expansion Proposal

Genesee Academy is currently a well run privately funded school in the greater Flint area, located in Swartz Creek, Michigan. This school is producing exceptional students in a variety of areas, including the arts and sciences. It is my hope, with the help of an outside infusion of funds the school will be able to further expand and develop numerous other science and technology programs that will allow it to offer these elite programs to students thereby producing very gifted graduates. By having such a stature of training programs in the area it will increase the possibilities that such graduates will return and both accept and create potions that will stimulate the economy of the area. Investing in our area students at a young age will likely pay off great dividends in the year to come. Requested funds of $5 million. 4/1/2009

Nursing Home

The Flint area is in great need for a Nursing Home facility. Currently we (IINN) have access to a Certificate of Need (CON) for a 130 beds and the space it would require. The location of (IINN) will be perfect for a clinical facility of this nature as it is close to all three area hospitals and sits near all main roadways. We would need the capital infusion in order to begin the build out and to immediately proceed with occupancy. 4/1/2009

High School

This funds proposal is with intent to establish a high school that is directly affiliated with Insight Institute of Neurosurgery and Neuroscience. This will be designed as private institution which will be catered to developing students with a high level of education beyond what can be offered at other institutions. To this end, we intend to introduce the international bachelorette program and have them directly affiliated with our research and clinical facilities, which will perhaps aspire towards a higher level of education. In an area that is so economically depressed, we believe that having such a strong institution in place, which has a unique affiliation with a scientific institution such as ours, we will be able to produce students who will hopefully then go on to help develop and revitalize the area by furthering or building the research sector in the area. 4/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2009

$

20,000,000

10/1/2009

$

25,000,000

10/1/2009

$

25,000,000

N s

Flint

t s e

u q e

A majority of the dormitories on campus are 40 years old or older. Major renovations to student housing include: installing fire suppression systems in the remaining three dormitories without sprinklers ($225,000); improving heating, ventilation and air conditioning systems and installing new boilers that will allow for greater energy efficiency ($500,000); adding siding to cover the exterior of the three cement block dormitories that will also improve energy efficiency ($390,000); and renovations to the flooring in dormitory hallways and rooms in 40 student areas ($800,000). Complete or partial funding assistance would allow Interlochen Center for the Arts to perform some of its most pressing capital improvements and devote its resources to the world’s most talented and motivated young artists that attend our boarding High School. Total estimated cost is $1,915,000.

R d

Interlochen Center for the Arts Interlochen

i m

Student Housing Renovations

b u S 02262009

e t tt

Submitted Requests - Not Approved

300 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Individual projects could be completed by September, 2009. A comprehensive renovation (all Braeside is one of Interlochen’s original structures and served as the first Camp projects listed) of cafeteria. Currently Braeside is used as the girls Camp recreation building. Necessary campus would be renovations include repairing the original foundation, replacing the roof and interior renovations would completed within roof support structures, windows and doors, and major updates to the electrical and begin upon two years of the plumbing (Green Project). Total estimated cost is $200,000. receipt of funding start date

O R

D VE

Interlochen Center for the Arts Interlochen

Braeside girls recreation building (1928)

Interlochen Center for the Arts Interlochen

Individual projects could be completed by Contains the Culver Faculty Center, Stone Hotel, and the campus’ largest September, 2009. cafeteria—where a majority of the 9,000 summer meals a day are prepared. Over the A comprehensive last several decades many renovation projects have been completed, including recent renovation (all updates to the hotel rooms. Replacing the Stone Student Center roof is a top priority projects listed) of to ensure recent upgrades are not damaged by a roof that is already leaking. campus would be Additional needed renovations include replacing windows and carpeting, installing air renovations would completed within Stone Student Center (1940, reconstructed in conditioning, and modernizing the kitchen and dish-room (Green Project). Total begin upon two years of the 1958) estimated cost is $250,000. receipt of funding start date

Interlochen Center for the Arts Interlochen

Individual projects could be completed by September, 2009. A comprehensive The Historic Fine Arts building has served as a classroom for some of the greatest renovation (all artists of our time, past and present. Today the Fine Arts building is still being used as projects listed) of a classroom and for performances and rehearsals. Essential updates include campus would be replacing the original floor, windows and doors (Green Project). Interior work includes renovations would completed within electrical, plumbing, acoustical treatment, partitions for classes, and installation of begin upon two years of the cabinetry for art supplies and instrument storage. Total estimated cost is $100,000. receipt of funding start date

T O

P P A

N s

t s e

u q e

R d

i m

b u S Interlochen Center for the Arts Interlochen

02262009

e t tt

Fine Arts Classroom Building (1946)

Maddy Administration Building (1952)

Individual projects could be completed by The Maddy Administration building is the primary office building on campus. As the September, 2009. Center has grown, parts never intended for use have been converted to office space. A comprehensive For example, the basement was originally built for storage and has now been renovation (all converted into office space. These Lower level offices need windows installed to fix projects listed) of inadequate ventilation and provide egress in case of emergency. Other critical campus would be updates include: reinforcing an aging roof structure to withstand heavy snow loads; adding insulation and improvements to heating, ventilation and air conditioning that wi renovations would completed within two years of the allow for greater energy efficiency (Green Project); along with requisite electrical and begin upon plumbing work. Total estimated cost is $200,000. receipt of funding start date

Submitted Requests - Not Approved

301 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Interlochen Center for the Arts Interlochen

Project Name

Project Description

Historic Student and Faculty Housing Renovations (1935-1965)

Start Date

We are in the process of green renovations to our summer faculty housing, and have about 25 residences left to update at a cost of $20,000 each ($500,000). Since we have already completed several green renovations of a like nature, details are available, as well as photos and other documentation. Essential green renovations include repairing original foundations, replacing roofs and windows, and updating the electrical and plumbing. A majority of the dormitories on campus are 40 years old or older. Major green renovations to student housing include: installing fire suppression systems in the remaining three dormitories without sprinklers ($225,000); improving heating, ventilation and air conditioning systems and installing new boilers that will allow for greater energy efficiency ($500,000); adding siding to cover the exterior of the three cement block dormitories that will also improve energy efficiency ($390,000) and renovations to the flooring in dormitory hallways and rooms in 40 student areas ($800,000). Complete or partial funding assistance would allow us to perform our most pressing capital improvements that are critical to the retention of faculty and stud

T O

Interlochen Center for the Arts Interlochen

Summer faculty housing (1935-60)

i m

Outdoor Pavilion

b u S 02262009

D VE

P P A

N s

t s e

A new outdoor facility to accommodate a wide range of performance and event needs including expanded summer Camp offerings, a segment of adult education programming, our growing need to connect with a large number of summer visitors, and our desire to showcase a new annual professional theatre initiative, the Interlochen Shakespeare Festival, which made a resounding debut in 2008. The total project cost for the Pavilion is $500,000; we have received gifts totaling $225,000; construction is scheduled to begin as soon as the remaining $275,000 in funds is construction is available. Drawings are available. This new outdoor facility will increase our ability to scheduled to attract people to our campus, region and state, thus increasing our impact on the loca begin as soon as economy during a time when Michigan is facing a serious economic crisis. 250,000 the remaining visitors from all over the world already come to Interlochen each year positively $275,000 in funds impacting on our region’s hospitality economy. is available.

R d

Interlochen Center for the Arts Interlochen

O R

Funding Request

Route (Infrastructure Only)

Individual projects could be completed by September, 2009. A comprehensive We are in the process of renovating our summer faculty housing, and have about 25 renovation (all residences left to update at a cost of $20,000 each. Since we have already completed projects listed) of several renovations of a like nature, details are available, as well as photos and other campus would be documentation. Essential renovations include repairing original foundations, replacing construction completed within roofs, and updating the electrical and plumbing (Green project). Total estimated cost would begin upon two years of the is $500,000. receipt of funding start date

u q e

e t tt

Expected Completion Date

Submitted Requests - Not Approved

Individual projects could be completed by September, 2009. A comprehensive renovation (all projects listed) of campus would be completed within two years of the start date

$

225,000

302 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Interlochen Center for the Arts Interlochen

Project Name

Project Description

Start Date

3 summer visual arts buildings

Individual projects could be completed by September, 2009. A comprehensive Construction of 3 summer visual arts outbuildings designed to be located adjacent to renovation (all our new year-round visual arts facility, to accommodate year-round needs relating to projects listed) of atmospheric ceramics firing and large-scale sculpture as well as summer visual arts campus would be learning for campers ages 8-15. Adult-education programs will also make use of construction completed within these outbuildings. Total cost is $300,000 and construction would begin upon receipt would begin upon two years of the of funding. receipt of funding start date

Apollo Hall Alumni Center (1937)

Individual projects could be completed by September, 2009. A comprehensive renovation (all projects listed) of Currently serves as the summer Alumni welcome center. Crucial structural repairs are campus would be needed to save this historic building, including roof support beams and major tuck renovations would completed within pointing to save the exterior stone façade, which is crumbling. Total estimated cost is begin upon two years of the $30,000. receipt of funding start date

O R

T O

Interlochen Center for the Arts Interlochen

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

P P A

N s

t s e

u q e

Interlochen Center for the Arts Interlochen

i m

b u S Interlochen Center for the Arts Interlochen

02262009

R d

e t tt

Lochaven Cafeteria (1953)

Individual projects could be completed by September, 2009. Lochaven serves as the summer cafeteria for the junior and intermediate boys Camp, A comprehensive serving over 1500 meals a day. As Interlochen continues to expand its programming renovation (all to serve more people and hosts more conferences, special events, and programs, projects listed) of Lochaven needs to be converted into a year-round cafeteria. This includes winterizing campus would be the seasonal building and renovating the dining hall and kitchen for increased renovations would completed within capacity, new roof and support struts, and foundation stabilization. Total estimated begin upon two years of the cost is $375,000. receipt of funding start date

Originally Kresge Auditorium was built for live performances that were completely acoustic in nature, did not require any type of amplification and needed only very simple lighting. Over the last several decades the nature of live presentation as changed dramatically. To continue to be a world class arts presenter, Interlochen Kresge Auditorium (1948, expansion in 1964) must invest in electrical and acoustical upgrades. Total estimated cost is $150,000.

Submitted Requests - Not Approved

Individual projects could be completed by September, 2009. A comprehensive renovation (all projects listed) of campus would be renovations would completed within begin upon two years of the receipt of funding start date

303 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

International Academy of Flint

The school seeks to install the appropriate technologies to make the school into a completely wireless facility. This will help with the school's attendance and disciplinary tracking information which is conducted on PDAs. 6/9/2009

9/9/2009

International Academy of Saginaw Saginaw

International Academy of Saginaw

The school seeks to install the appropriate technologies to make the school into a completely wireless facility. This will help with the school's attendance and disciplinary tracking information which is conducted on PDAs. 6/9/2009

9/9/2009

International Academy of Saginaw Saginaw

International Academy of Saginaw

In lieu of construction, the school would rent two mobile classrooms for the upcoming year to handle increased student population. 6/1/2009

International Academy of Saginaw

Creation of three parking lots for the school. These lots would include a parent/visitor lot with appropriate lighting, a staff/parent/visitor lot with appropriate lighting and a staff lot with appropriate lighting. Currently there is insufficient parking for staff and parents which has been raised as a concern by both parties. 6/1/2009

International Academy of Saginaw

Construction of an addition to the existing facility to include 8 classrooms, hallways, bathrooms and other educational and office space as needed. This will include all necessary wiring, cabling, etc. to fully integrate these new classrooms with the existing school facility.

International Academy of Flint Flint

Funding Request

Route (Infrastructure Only)

$

40,000

$

30,000

$

165,000

9/1/2010

$

245,000

9/1/2009

$

2,500,000

City of Ionia

Ionia Community Library Building

The Ionia Community Library has been located in the same historic 5,500 sq ft home since 1903 when it was donated to the City of Ionia to be used as a Library. The community’s needs have outgrown this home. A gentler use as a Genealogy branch is planned to sustain its historic beauty. A new 16,686 sq ft building, located 1 block away, would provide for a larger collection that all patrons would have access to and could use. A new building would meet the needs of the community by creating space for: a larger collection, more than one toilet, parking and drive-up book drop, access to computers and the internet, shorter waiting lists for books and materials, aisles wide enough for wheelchairs, walkers, strollers, an on-site program room, comfortable seating, quiet study areas and greater access to programming events. The new building would be built on property already purchased. This project was presented to the voters of the district in 2007 as a millage increase of .83 mills and was turned down due to the declining economic situation in Ionia County. Private funds were pledged of $250,000 of which half have been collected and the rest expected once a b6/15/2009

6/15/2010

$

5,023,000 n/a

Caspian, Michigan

The Iron County Museum plans a major renewable energy/conservation project in the main Museum complex and to use this installation for greening education, demonstration and training. This will include: 1) insulation of the 7200 sq.ft. "Cultura Center", built in 1987.K5 By using blown foam and cellulose, the R rating of the building will be tripled; 2) The four 20+ year old 80% efficient furnaces will be replaced with two +90% units and 2 heat pumps. This will further reduce our energy consumption by 15% and reduce the humidity in the summer, protecting our exhibits. 3) the installation of an 8KWH solar electric system that will offset approximately 25% (10000KWH) of the Museum's electric load; 4) an electrical conservation demonstration that will replace incandescent light bulbs with CFL bulbs. The main overhead lighting used throughout will be replaced with 25-30W bulbs and new fixture Greening the Iron County Museum: renewable where applicable. Motion activated switches, smart timed outlets, and radio controlled energy/conservation, -- installation, education, switches and outlets will reduce the electrical usage when visitors are not present. Between the use of solar generation and good conservation techniques, the Museum 5/15/2009 demonstration and training

6/30/2010

$

International Academy of Saginaw Saginaw

International Academy of Saginaw Saginaw

T O

P P A

O R

6/1/2009

9/1/2009

D VE

N s

t s e

Ionia Community Library

u q e

R d

e t tt

i m

Iron County Museum

02262009

b u S

Submitted Requests - Not Approved

138,745

304 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Iron River Township

Ironwood Carnegie Library Ironwood Township Ironwood Township

Iron River Township

Ironwood, MI Ironwood Township, Gogebic County Ironwood Township, Gogebic County

Project Name

Project Description

Start Date

In June of 2008, Nelson Tank Engineering and Consulting, Inc. (NTEC) of Lansing completed tank inspections for the Township’s Nash and Beechwood elevated water storage tanks. NTEC completed and submitted reports for each tank which summarized the results of their inspection, and recommended improvements. The proposed improvements for the Beechwood tank included repainting of the tank interior and exterior, spot weld repairs on the tank interior, the installation of a fall prevention devise, repairs to the roof hatch and overflow piping, repairs to the column footings and the repainting of the pit piping. The proposed improvements for the Nash tank included repainting of the tank exterior, spot cleaning and painting of the interior, repairs to the antivortex plate and overflow, repairs to the concrete footing and the installation of a fall prevention device. In addition, due to the presence of lead the removal of the Nash tank coating will require that lead abatement procedures be followed. 5/1/2009

Water Tank Rehabilitation

Renovation of an historic, 1901 library in the Upper Peninsula Charter Township of Ironwood Water Improvements Charter Township of Ironwood Wastewater Improvements

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2009

$

4 months after start date

$

1,800,000 N/A

May, 2011

$

3,500,000 NA

2010

$

1,000,000 NA

Funds for this project will cover program cost including; purchase and maintenance of curbside recycling truck, residential curbside collection bins, and printing of informational material. Future funding will be provided through program fees charged to participating residents. The Program will be designed for expansion to serve other communities as demands for recycling services increase. In Isabella County this program would expand recycling options to all residents at financially feasible rates. Directly this program will serve a projected population over 15,000 and generate permanent jobs for collection and processing of recyclables. There is an increasing demand/need from County residents for expanding recycling in Isabella County. This ultimately will lessen the County’s dependency on landfill space and reduce the cost o hauling to out county landfills. Isabella County has a goal to recycling more, which directly preserves and protects natural resources for our future residents. 6/1/2009

10/1/2009

$

188,950

A collaboration of Isabella County Municipalities, Saginaw Chippewa Indian Tribe, and Central Michigan University propose to create a regional composting program. The program will facilitate the recovery of organic waste created by businesses, governmental agencies, and residences. The organic waste, including food waste will be processed via anaerobic digestion and composting to produce biogas and compost. Products will be utilized as liquid fuel and compost will be sold to generate revenue, enabling the site to become self-sustaining. As organic waste is a daily part of the municipal waste stream, the jobs created, will be permanent positions. The result of the program will be new employment opportunities in the local community for site development (short term) and site operation (long term), decrease landfill dependency, reduce tipping fees, and produce a valuable by-product. Funds provided through the American Recovery and Reinvestment Plan will be used to develop the needed infrastructure for the composting site. The selected site will require installation of a compost pad, an access road, the construction of an office and6/1/2009

10/1/2009

$

971,000

A T

Built in 1901, the library serves a rural and underserved community. The historical builidng is beautiful, however, relatively unchanged, it is showing its age. Little has been done to update the electrical, HVAC, handicap accessibility, and space needs of the 21st century. The majority of the renovations will allow us to be green (energy efficient heating, ventilation, air conditioning and electrical. windows, and other improvements) as well as handicap accessible. ASAP

s

O N

Installing own water system with miles of water lines. Spring 2009 In conjunction with our water sytem, we will install new sewer lines along Lake Road, as the existing sewer lines are disintegrating. July, 2009

t s e

258,000

u q e

Isabella County Recycling Center MRF

Mt. Pleasant, MI

Community Curbside Program

i m

b u S Isabella County Recycling Center MRF and Isabella County MSU Extension Mt. Pleasant, MI

02262009

e t tt

R d

Community Compost Program

Submitted Requests - Not Approved

305 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency IWRHS Inland Water Route Historical Society

IxCore Solutions, Inc.

Alanson Michigan

Flint

Project Name

Project Description

Start Date

Steamer Boat House

Consruction of a 2 stall boat house for the Inland Water Route Historical Society. The boathouse will house a Launch Steamer. 6/9/2009

OnlineCare

Currently all major medical device, pharmaceutical as well as other bio-medical companies have very limited access to consumers related to the medications they use, medical devices they have in their body or they utilize as well as clinical providers are being restricted from accessing these fundamental educational knowledge base due their over commitment in their professional work load or by the institution they work for due to conflict of interest or because of formulary restrictions. Impact of such a lack of access to consumers and clinical providers are extremely “risky” and will increase cost of clinical care either due to lack of follow-though, knowledge, risk, high or un-needed utilization as well as lack of access for proper / sufficient clinical education specially for rural regions of the country. This technology will link “all” medical device manufactures, pharmaceutical and bio-medical firms to the consumers and medical/ clinical care providers creating an “access” to the knowledge base / education which other wise doesn’t exists. 9/1/2008

T O

ceiling tile replacement through out building currently building has exposed wiring in some spots .

Jackson Arts and Technology Academy Jackson

replace warped gym floor and refinish

Jackson Arts and Technology Academy Jackson

roof replacement

Jackson Arts and Technology Academy Jackson

repair boiler system, electrical system, plumbing system, elevator and parking lot paving

Jackson Arts and Technology Academy Jackson

steam trap replacement

-N

e u

eq

9/9/2009

O R

P P A

Jackson Arts and Technology Academy Jackson

s t s

Expected Completion Date

Funding Request

$

Route (Infrastructure Only)

42,626

D VE

8/1/2011

$

15,000,000

6/1/2009

9/1/2009

$

65,000

6/1/2009

9/1/2009

$

20,000

6/1/2009

9/1/2009

$

98,000

3/1/2009

7/1/2009

$

26,000

2/1/2009

3/1/2009

$

39,000

$

2,500,000

R d

Jackson County Intermediate School District (JCISD) Jackson District Library Jackson District Library Jackson District Library

i m

e t tt

b u S

Jackson, Summit Township

Ingenuity Center

The project is an addition/renovation to the current Jackson Area Career Center (JACC) facilities. This addition/renovation, called an "Ingenuity Center", willl allow for secondary advanced manufacturing programs that allow high school students to work along side adult learners from the Academy for Manufacturing Careers (AMC). The AMC is a proprietary school run by the Jackson Area Manufacturers Association, in partnership with the JCISD, Jackson Community College, and South Central Michigan Works!. It provides targeted training for current manufacturing firm employees and displaced workers. A majority of their classes currently take place at the JACC. Due to the growth of their program and the increased need to train young people in advanced manufacturing, current facilities need to be expanded/renovated to answer this demand. This addition/renovation will be built using Green concepts and allow all JACC programs to explore Green connections to their studies. This expansion/renovation would also facilitate a larger educational pipeline that exposes students at a young age to the skills necessary for "creating and making things" and th

City of Jackson, MI

9/1/2009

8/31/2011

$

16,159,800

Grass Lake, MI (Grass Lake Charter Township)

9/1/2009

3/31/2011

$

2,059,100

Summit Township

9/1/2009

3/31/2011

$

2,654,600

02262009

Submitted Requests - Not Approved

306 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Jackson District Blackman Charter Library Township Jackson District Brooklyn, MI (Columbia Library Township) Jackson District Concord, MI (Concord Library Township) Jackson District Hanover, MI (Hanover Library Township) Jackson District Library Henrietta Township Jackson District Library Leoni Township Jackson District Napoleon, MI (Napoleon Library Township) Jackson District Parma, MI (Parma Library Township)

Project Name

Project Description

Start Date

Jackson District Library Infrastructure Improvement Project

12/31/2010

$

2,981,980

7/1/2009

12/31/2010

$

1,652,475 Not Applicable

7/1/2009

12/31/2010

9/1/2009

3/31/2011

968,700

$

949,290

$

923,190

3/31/2011

$

2,491,068

12/31/2010

$

555,175

9/1/2009

3/31/2011

$

1,018,690

9/1/2009

3/31/2011

$

1,603,175

9/1/2009

3/31/2011

$

969,190

March '09

July '10

$

2,300,000

October '09

$

1,200,000

Zoo Warehouse expansion and loading dock for storage of equipment and other resources. Movement and improvement of electrical utilities from above to below ground.Needed renovation of 50 year old bear exhibit to provide shade, improved surfaces, improved educational opportunities, energy efficiencies. Also renovation of July 1, 2009 if former lion/tiger exhibits into educational activity center for visitors. funding is in hand 4/1/2010

$

3,000,000

Zoo needs to add turn lane on Rt21. ,provide new zoo/park entrance, driveway into park, new "green" parking lots, and pedestrian pathways

$

3,000,000 M21

Commence Construction Early Fall 2009 & complete 9-1-10 $

2,069,000 N/A

9/1/2009

A T

Spring Arbor, MI (Spring Arbor Township) Springport, MI (Springport Township)

Jamestown Charter Township

Jamestown Charter Township, Ottawa County, MI New Fire Department Facility

Construction of a 14,140 square foot Fire Department Facility to replace an existing extremely undersized and outdated facility.

Jamestown Charter Township

Jamestown Charter Township, Ottawa County, MI Sanitary Sewer System Replacement

Construction of approximately 1 mile of sanitary sewer and pump stations to replace an existing step sanitary sewer system with multiple delapidated pump stations. July '09

John BallZoo Society

Zoo/Park entrance, state road work, driveways, and parking lots

itt

Jonesfield/ Lakefield Fire District

02262009

d e t

Jonesfield / Lakefield Fire/Rescue Facilities

s

st

e u

q e R

m b u

S

Village of Merrill, Jonesfield Twp. & Lakefield Twp.

O R

PP

7/1/2009

Zoo Infrastructure and Exhibit Renovation

D VE $

7/1/2009

John Ball Zoo Society Grand Rapids

Funding Request

Route (Infrastructure Only)

7/1/2009

Jackson District Library Jackson District Library

Grand Rapids

Expected Completion Date

O N

July 1,2009, if funding is in hand 4/1/2010

Design and Construct a new F/R facility & sub-station. Formed in 1964, the all Volunteer Dept. provides Fire/Rescue services for the Village, 2 Twps and mutual aid to surrounding Depts. which include HSC & CE. The main facility, built in the1940's, is functionally & structually obsolete, undersized and has a serious flooding problem. It is planned to replace the main facility and small substation, serving the Southern part of the Dist. Adjacent properties have been acquired and an Architect engaged to develop preliminary plans and cost estimates. Originally it was planned to present a ballot proposal for a millage, along with grants, to finance. Due to costs and the economic downturn, coupled with the costs to residents for a new, 2007 completed 2009-Finish municipal water system, it is doubtful this much needed project can become a reality Design- Bid & unless other finances can be secured. Award Project

Submitted Requests - Not Approved

12/31/2010

307 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Jonesfield/ Lakefield Fire District

Kalamazoo Cultural Center (c/o Arts Council of Greater Kalamazoo)

Kalamazoo Cultural Center (c/o Arts Council of Greater Kalamazoo)

Village of Merrill, Jonesfield Twp. & Lakefield Twp.

Project Name

Project Description

Start Date

Jonesfield / Lakefield Fire/Rescue Facilities

Design and Construct a new Fire/Rescue facility & sub-station. Formed in 1964, the all Volunteer Dept. provides Fire/Rescue services for the Village, 2 Twps and mutual aid to surrounding Depts. which include Hemlock Semi Conductor & Consumers Energy. The main facility, built in the1940's, is functionally & structually obsolete, undersized and has a serious flooding problem. It is planned to replace the main facility and small substation, serving the Southern part of the Dist. Adjacent properties have been acquired and an Architect engaged to develop preliminary plans and cost estimates. Originally it was planned to present a ballot proposal for a millage, along with grants, to finance. Due to costs and the economic downturn, coupled with the costs to residents for a new, 2007 completed municipal water system, it is doubtful this much needed project can become a reality unless other finances can be secured. 9/1/2009

Building Greening - Energy, Water, and Plumbing

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

9/1/2010

$

The Kalamazoo Cultural Center, also known as the Epic Center, is located in the City of Kalamazoo, in the downtown district. The building has four (4) levels and houses 14 organizations, consisting of 11 non-profit arts organizations, two performance theatres, a retail store, a restaraunt, and the local cable access television station. The building was renovated 10 years ago from a former Jacobson's department store, but an old infrastrucure was left in place in the form of the elevators, for which we have requested funding, above. In addition, we are requesting funding for the "greening" of our building, including water and plumbing fixtures, efficient lighting systems and mechanical controls for the entire building. These will provide tremendous energy efficiency for this 4-level building, which houses 174 employees in downtown Kalamazoo. 6/1/2009

10/1/2009

$

Capital Investment 520,000 Grant

The Kalamazoo Cultural Center, also known as the Epic Center, is located in the City of Kalamazoo, in the downtown district. The building has four (4) levels and houses 14 organizations, consisting of 11 non-profit arts organizations, two performance theatres, a retail store, a restaraunt, and the local cable access television station. The building was renovated 10 years ago from a former Jacobson's department store built in the 1960s, is extremely inefficient, and in dire need of updating. Therefore, we are requesting funding for the "greening" of our building, including water and plumbing fixtures, efficient lighting systems, LED exit signs, and efficient mechanical controls for the entire building, including elevators and escalators. These will provide tremendous energy efficiency and sustainability for this 4-level building, which houses 174 employees in downtown Kalamazoo. 6/1/2009

10/1/2009

$

Capital Investment 640,000 Grant

New 111,442 sq. ft. Special Education Facility on Milham Avenue in Portage Michigan to serve students with severe disabilities and students with autism spectrum disorder. (Request for funding is to assist with shortfall due to economic indicators that have greatly reduced our ability to earn projected interest required for the project) 4/1/2009

7/1/2010

$

25,514,851

T O

City of Kalamazoo

Expected Completion Date

N s

t s e

2,069,000 N/A

u q e

R d

e t tt

Building Greening - Energy, Water, Mechanical and Plumbing

City of Kalamazoo

i m

Kalamazoo Regional Educational Service Agency

Portage, MI

Kalamazoo Township

Kalamazoo Township

Old Douglas (Goodrich) to G Avenue Sanitary 1,900 LF of sanitary sewer extension

8/15/2009

11/15/2009

$

450,000

Kalamazoo Township

Kalamazoo Township

Nichols Road Sidewalk Barney south

2,700 LF Nichols Road sidewalk from Barney Road to Grand Prairie

8/15/2009

11/15/2009

$

145,000

Kalamazoo Township

Kalamazoo Township

Eastwood Fire Station

13,000 SF fire station with living quarters and community room

8/15/2009

9/15/2011

$

3,500,000

Kalamazoo Township

Kalamazoo Township

Eastwood Area Storm Sewers

Eastwood area storm sewers

8/15/2009

11/15/2010

$

5,100,000

Kalamazoo Township

Kalamazoo Township

East Main and Nazareth

1,200 LF of 8 inch sanitary sewer from Huntington Avenue

5/15/2009

11/15/2009

$

202,000

Kalamazoo Regional Educational Service Agency

ub

S

02262009

Submitted Requests - Not Approved

308 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Kalamazoo Township

Kalamazoo Township

Francis Avenue

1,250 LF of 8 inch sanitary sewer

5/15/2009

11/15/2009

$

210,000

Kalamazoo Township

Kalamazoo Township

Douglas Avenue from Red Maple south

5/15/2009

11/15/2009

$

234,000

Kalamazoo Township

Kalamazoo Township

Winding Way

1,300 LF of sanitary sewer extension in Douglas Avenue 2,000 LF Winding Way 10 inch sanitary sewer from existing pump station to Ravine Road

5/15/2009

11/15/2009

$

300,000

Kalamazoo Township

Kalamazoo Township

Nichols Road

1,400 LF of sanitary sewer deepened to serve to BL 131

5/15/2009

11/15/2009

$

336,000

Kalamazoo Township

Kalamazoo Township

Huntington Avenue

1,400 LF of 8 inch sanitary sewer, lift station, 1,300 LF of force main

5/15/2009

$

598,000

Kalamazoo Township

Kalamazoo Township

N. Pitcher Street

5/15/2009

11/15/2009

$

624,000

Kalamazoo Township

Kalamazoo Township

Kendall Avenue Sidewalk to Solon

2600 LF of 21 inch sanitary sewer in Pitcher to G Avenue, eliminating lift station 2,500 LF Kendall Avenue sidewalk connecting West Main (M43) to campus of Western Michigan University

11/15/2009

$

150,000

Kalamazoo Township

Kalamazoo Township

Solon Street Sidewalk

800 LF Solon sidewalk from West Main (M43) to Santos Street

5/15/2009

11/15/2009

$

38,000

Kalamazoo Township

Kalamazoo Township

Grand Prairie Sidewalk

1,300 LF Grand Prairie sidewalk from Drake to Cumberland

5/15/2009

11/15/2009

$

45,000

Kalamazoo Township

Kalamazoo Township

Intersection Sidewalk ADA ramps

Improve intersection sidewalk ramps to conform to ADA requirements

5/15/2009

11/15/2009

$

60,000

Kalamazoo Township

Kalamazoo Township

Nichols Road Sidewalk Barney north

5,000 LF Nichols Road sidewalk from Barney Road to Valleywood Plats

5/15/2009

11/15/2009

$

270,000

Kalamazoo Township

Kalamazoo Township

Township hall expansion

Addition of 1,600 SF for office, fire and police services

5/15/2009

11/15/2009

$

450,000

Kalamazoo Township

Kalamazoo Township

Maintenance/Storage Facility

maintenance facility and storage garage

5/15/2009

9/15/2010

$

570,000

Kalamazoo Township

Kalamazoo Township

Squires Road

Reconstruction of Squires Road from Drake to Ravine

6/15/2009

11/15/2009

$

396,000

Kalamazoo Township

Kalamazoo Township

Huntington and Francis Avenue

2,100 LF of 8 inch water main

5/15/2009

11/15/2009

$

190,000

3/1/2011

$

d e tt

Kent/MSU Extension

ub

t i m

Grand Rapids/Kent County

Energy Sense Means Cents

e u

st

q e R

s

6/15/2009

A T

O N

PP

O R

The Grand Rapids/Kent County area will provide a spectrum of educational and energy efficiency measures to primarily low income home owners through a unique partneship of: City of Grand Rapids, West MI Environmental Action Council, Community Action Agency Weatherization Program, several neighborhood associations, and Kent/MSU Extension. Neighborhood Energy Organizers (NEOs), newly created positions, will take the newly developed Energy Tool Box to neighborhood homeowners who need a basic home energy audit. They will work with the household to achieve preliminary savings on utility bills and then refer them to other energy efficiency programs for additional improvements and education. As the number of energy-saving improvements are made, their knowledge of the environmental consequences of their actions will also increase. The NEOs will also do follow-up visits in their neighborhood to those who had energy efficiency improvements made by the City of Grand Rapids grant/loan programs and ACSET's weatherization program to make sure the homeowner is making full use of the improvements and answer any questions. The ultimate goal is having each participan 3/1/2009

11/15/2009

D VE

Route (Infrastructure Only)

1,157,500 N/A

S 02262009

Submitted Requests - Not Approved

309 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kettering University

Kettering University

Kettering University

Project Name

Project Description

Replacing two existing chillers that are 600-ton single effect absorbers. The new chillers will be ordered for manufacture during the spring and installed over the winter. Energy efficient electric centrifugal chillers will be installed. Electrical service will be upgraded to handle the additional load and include sound testing due to the proximity of the units to classrooms. The removed chillers will be recycled as scrap with proper disposal of the lithium bromide coolant. The machine room will be upgraded to Replace 30 year old central chiller system with ASHRAE standard 15-2004 compliance providing a safe work environment for high energy efficiency units (1,200 tons of university employees and local contractors. The projected return on investment is cooling capacity) calculated to be 10 years based on energy savings. 2/15/2009

Flint

Dislocated and At-Risk Technology Workers Skills and New Competencies Training

Flint

Center for Alternative Energy and Advanced Materials Manufacturing Research and Development

This center will prepare Michigan's manufacturers to mass produce alternative energy technologies such as fuel cell components and systems. Mass production of the many innovative technologies in this field involves integrating advanced materials and manufacturing methods into our Michigan productive capacity of plants, logistics, and people. The center will work on materials, process and design innovations to reduce complexity, streamline operations, minimize waste and increase overall operational efficiencies. 3/1/2009

Flint

Providing Michigan students with the critical skills for the New Economy is the imperative for our primary and secondary teachers. From laboratory to classroom, this program puts cutting-edge case studies, practical examples and exciting problemsolving exercises in the hands of K-12 "STEM" teachers across Michigan. Working with professors and technologists, teachers will enhance their knowledge and apply proven methods and processes to achieve the three key teaching objectives of Rigor, Relevance, and Relationships. Real-world Michigan economic development priorities in life sciences, alternative energy, advanced materials and manufacturing, homeland security and next generation automotive can be integrated into their instruction within their BOE and state-approved course structures. Kettering will partner with other universities' Education Departments and intermediate school districts to allow Statewide Science, Technology, Engineering, teachers to obtain graduate and continuing education credit for their participation. The students themselves can benefit from creating their Educational Development Plans and Mathematics ("STEM") Teaching Skills to take advantage of better awareness of their newly emerging career options. The ap2/15/2009 and Knowledge Certificate Program

Flint

T O

d e tt

q e R

N s

st

t i m

O R

P P A

Scaling a highly-successful pilot program, more than 5,000 at-risk and displaced workers would bring their skills and advanced technology knowledge current for key Michigan economic development needs. Leveraging the candidate recruitment and training facilitation successes of the "Java™ Michigan" program, hands-on and live on line training will update and expand our tech and engineering workers in: IT, advanced manufacturing, design, engineering, global logistics, machine vision, robotics, and others. 4/1/2009

e u

Kettering University

Start Date

Expected Completion Date

5/15/2010

Funding Request

Route (Infrastructure Only)

D VE $

1,250,000

1/31/2010

$

1,750,000

1/31/2011

$

1,800,000

1/31/2011

$

2,125,000

6/30/2009

$

2,750,000

ub

S Kettering University

Flint

02262009

This investment in alternative energy will provide long-term employment sustainability benefits. Fuel cell, solar, wind and geo-thermal alternative energy installations will provide hands-on experiences for students and researchers on commercial-scale facilities at several locations on campus. The C.S. Mott Science and Engineering Center presently has the required infrastructure in place to accept integration of a 200 kilowatt stationary fuel cell as both a sustainability measure reducing fossil fuels usage as well as an emergency backup generator for critical power circuits. A study for Alternative Energy Research and Generation positioning solar panels, low-noise wind turbines, and other potential technologies on campus will be conducted with numerous small contractor installation opportunities. 2/15/2009 Capacity

Submitted Requests - Not Approved

310 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kettering University

Kettering University

Flint

Flint

Project Name

Project Description

Start Date

Expected Completion Date

Kettering University Science & Technology Incubator Building - LEED Certification

Per Title IX, Subtitle C, Section 9302 - Higher Education Modernization, Renovation and Repair - To construct the approximately 9,000 gsf laboratory incubator building to be designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System. The proposal includes costs associated with 'Greening' this facility which currently is being bid for General Construction. $260,000 is being requested for expenses including but not limited to: design & contruction cost premium for energy efficiency, USGBC filing fees, A&E design fees & building commissioning. 2/15/2009

Former Manufacturing Plant Evaluation and Site Remediation Plan

A portion of the Kettering University campus were former industrial manufacturing facilities. The concrete pad from the site still exists. During the closure of the facilities, limited environmental studies were conducted. In order to develop the site and provide adequate storm water drainage, additional environmental evaluation is required. The results of this evaluation will be used to develop a site remediation plan At that time, uses for the site will be evaluated and prioritized. The current visual condition of the site is estetically unappealing and discourages future development in a very economically depressed community. The improvement of the site is hoped to result in attracting new businesses and increasing student enrollment at the University. 2/15/2009

Kids 'N' Stuff Outdoor Exhibit

O R

D VE $

3,700,000

2/15/2011

$

500,000

Kids ‘N’ Stuff will create an outdoor play space to extend the museum learning experience to the outdoors. Transforming a currently vacant downtown lot near the museum into a learning space will not only help the museum, but help with the revitalization of the downtown area. This space will be used by museum staff and guests, as well as those people visiting the downtown area. Connecting kids to nature and giving them activities to do while outside will allow the museum to expand the learning that is taking place. This outdoor area will include trees, flowers, and other plants that will be used to teach the needs of living things. The play areas will include items like climbing structures and sand boxes. 5/1/2009

8/1/2009

$

25,000

To repair unsafe access areas--reconfigure the back employee/delivery entrance and remove and replace steps and asphalt to code; repair/replace concrete on front steps from street to public entrance; intall dock area for large deliveries by reconfiguring the double entrance; repair fire escape, hand rails, and metal grates (especially those that have failed and are now unsafe) around building. Each of these projects address safety issues. 6/1/2009

12/31/2009

$

59,000

Alternative Energy

To lower energy bills: Install solar panels on roof, install 4 rooftop wind turbines units (to include lightning protectection); estimated cost of $140,000 includes products, delivery, and installation. Current average monthly electricity bill is $1800. To light up the parking lots: Intall 8 parking lot solar light units (to include lights, solar energy panels, poles, batteries); $50,000 price includes product, shipping, and installation. Currently, there are no lights in the two parking lots. 6/1/2009

12/31/2009

$

190,000

Ext. Public Areas

Replace 3 unsafe and dilapidated wooden benches with concrete or green product, install 4 hose bibs for access to outside water supply and run necessary piping from city water supply. Currently, we carry the water in buckets from inside or we open doors and string hoses to area needing water. This is a loss of energy (human and/or electricy). 6/1/2009

9/30/2009

$

16,000

Handicap Access

The handicap access from the parking lot to the front of the door has not been updated in 30 years. It is impossible for someone in a wheelchair to make it to the front door without assistance. We need to pull out the old asphalt walkway, regrade the area, expand the width, lay new asphalt or cement, install curbs on both sides, and install handrails as there is a slight incline. 6/1/2009

10/31/2009

$

25,000

T O

2/1/2010

Funding Request

Route (Infrastructure Only)

P P A

N s

Kids 'N' Stuff Children's Museum Albion

Kingman Museum

Kingman Museum

Kingman Museum

Kingman Museum

Battle Creek, MI

Access Safety

tt i m

b u S

Battle Creek, MI

Battle Creek, MI

Battle Creek, MI

02262009

d e t

t s e

qu

e R

Submitted Requests - Not Approved

311 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Kingston Community Schools Kingston Community Schools Kingston Community Schools Kingston Community Schools Kingston Community Schools Kingston Community Schools Kingston Community Schools Kinross Charter Township

Kinross Charter Township

Kinross Charter Township Kinross Charter Township Kinross Charter Township

Location City or Township

Project Name

Project Description

Start Date

Funding Request

Kingston

Kingston Community

Replace Elementary Compressor with Dryer System

5/1/2009

9/1/2009

$

6,500

Kingston

Kingston Community

Upgrade Student Data System to include parent portal

5/1/2009

9/1/2009

$

7,500

Kingston

Kingston Community

New Computer System Server

5/1/2009

9/1/2009

$

8,000

Kingston

Kingston Community

Polycom Unit Distance Learning

5/1/2009

9/1/2009

$

10,000

Kingston

Kingston Community

Reconstruct Elementary Playground

5/1/2009

$

200,000

Kingston

Kingston Community

Education Technology Infrastructure-Fiber to ISD

8/1/2009

12/31/2010

$

140,000

Kingston

Kingston Community

Energy Audit and Retrofit

5/1/2009

9/1/2009

$

50,000

Kincheloe/Kinross Township

upgrade of Township Hall and Receration Centers to provide for Wind Energy useage.

Install VAWT (Vertical Axis Wind Turbines) to the Kinross Township Hall and Kinross Recreation Center to reduce energy dependence and improve our carbon footprint late 2009

2011

storm drain repair/cleaning in Kincheoloe housing complex

The housing in Kincheloe is the product of an Air Force base conversion. The sewer service is from this era. As such, it is in need of service/repair/upgrades. This project is of the utmost importance to this housing area as we have serious drain problems in spring because of its age. ASAP

2011

Kinross Township is in need of an upgraded ambulance/fire barn. This is also as a result of this area being a Air Force base conversion. The two emergency service buildings are old Air Force buildings from the 1950's, and in need of extensive repairs. We are also fortunate enough to be the future site of Mascoma, an alternative energy corporation. When this project is completed, the township will be in need of updated buildings and equipment to be able to service this project should the need arise. late 2009

2011

Kincheloe/Kinross Township

Kincheloe/Kinross Township Kincheloe/Kinross Township Kincheloe/Kinross Township

A T

s

t s e

O N

qu

O R

PP

9/1/2009

Kinross ambulance/Fire Barn Forest Lodge Rd & Cypress Lane Water main replacement This is a continuation of work already done in this area of the Kincheloe sbudivision.

ASAP

2010

Windermere Drive main replacement

ASAP

2010

2011

e R

This is a continuation of work already done in this area of the Kincheloe sbudivision.

Kinross Charter Township

Kincheloe/Kinross Township

To assess and deteremine why sand is in the water on the streets in this area. Resident complaints have been ongoing. An assessment of the cause of this problem Taylor Day Way and Christopher Stree Water needs to be done and then from the findings the township needs to be able to fix/repair whatever needs to be done in this area of the housing complex ASAP Improvements

Kinross Charter Township

Kincheloe/Kinross Township

Waste Water Treatment Plant

Kinross Charter Township Kinross Charter Township

Expected Completion Date

d e tt

it

The waste water treatment plant is in need of several repairs including: Air diaphram pump and waste sludge controls, a primary digester, and outfall line. ASAP

2011

Kinross/Kinross Township M-80 to 1-75 water/sewer project

Run water and sewer along W. M-80 from Fair Rd. running approx. 6 miles west to I 75 area. This would allow the businesses in the area access to township water and sewer as well as allowing for residents in this area access to township water services ASAP

2010

Kinross/Kinross Township Fair Rd. area water/sewer project

Run water and sewer along Fair Rd. area from each end of M.80

2010

02262009

u S

bm

Submitted Requests - Not Approved

ASAP

D VE

Route (Infrastructure Only)

312 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kochville Township

Kochville Township, Saginaw County

Project Name

Project Description

Start Date

Kochville Road

Replacement of one (1) mile of old Crown style constructed road. There is extensive deterioration on both side edges and the center of the road. Surface has had years of patching for pot holes which has left an estimated 80% of an uneven cobble-stone effect, with sections sinking and dipping down one to two feet. It is the quickest route for the Fire Department to take to access the center eastside of the township, which contains businesses, residential sub-divisions, trailer parks, and off campus housing for Saginaw Valley State University students. The road is heavily used by residents and commercial venders to bypass the business area one & a half (1 ") miles south. The Township board is considering a request to Saginaw County to shut the road down to all but local traffic. The Township board may have no choice but to make a motion to disallow the Fire Department to use the road in case of emergency because of the road’s condition in regard to safety. This would have a devastating impact on emergency response time by the Fire Department adding a minimum of roughly five (5) minutes extra travel time for an alternate route, and would jeopardize health and sa5/1/2009

Interceptor Sewer

Construct approximately 5700 lft. of 36" dia. Gravity sanitary sewer and approximately 4000 lft. of 12" dia. Water main to permit the Township to continue to serve the needs of SVSU and continue to promote residential, commercial and industrial uses in the areas of the existing collection system and water distribution system. The interceptor sewer will eliminate 2 existing pump stations and provide the potential for the elimination of 2 additional existing pump stations. The 12" water main will provide a second supply for reliability and additional fire flows to an existing developed light industrial area. The elimination of the pump stations will reduce engergy requirements for normal operation and eliminate emmission of hydrocarbons when it it necessary to operate on-site generators. A portion of this project will be funded by an existing CDBG awarded to assist in creating 40 semi-skilled manufacturing jobs. 4/1/2009

Hospital Smart Pump Initiative

The is new technology that aids healthcare workers by providing exact dosing of critical medication to increase positive medical outcomes, reduce costly mistakes, and waste of expensive medications 6/1/2009 Electronic health records (EHR) improve the efficiency of the health system by reducing error, fraud and abuse while incresing the quality of care for Medicare, Medicaid, and private pay patients. Further, by providing connectivity between the hospital, medical groups and physician community can help to substantially improve the overall health statistic for the community at large.

T O

Kochville Township Lakeland Healthcare Association

Lakeland Healthcare Association

Kochville Township, Saginaw County

Benton Harbor

Greater Benton Harbor and surrounding areas

d e t

Benton Harbor Area Electronic Health Records Initative

itt

m b u

S

Lakes Area Sewer Authority

Marcellus and Volinia Township, Cass County and Porter Township, Van Buren County

02262009

Lakes Area Sewer Authority Wastewater Collection & Treatment System Project Septage Receiving Station and Alternative Energy Portion

t s e

qu

6/1/2009

The Lakes Area Sewer Authority, through the Cass County Board of Public Works, has secured USDA funding and is proceeding with a $10.4 million wastewater collection and treatment system project to construct sanitary sewers around the Finch Fish, Gravel and West Saddlebag Lake areas. The proposed wastewater treatment plant will also serve the Village of Marcellus customers. This project is fully funded, assessed and is scheduled to begin construction on 06/06/09. The treatment plant will be a 250,000 gpd activated sludge process, expandable to 1.0 mgd, with conventional utility and generator electric sources. The base basin designs will permit the receipt of septage, requiring installation of only a septage receiving station and associated headworks/piping/etc. In an effort to construct an even more environmentally friendly project, the LASA is now pursuing additional grant funding to install alternative/green energy technologies, which were previously cost preventative. This will help lower operating costs. Grant funding is also being sought for construction of a septage receiving station. With a lack of dump stations in the vicinity6/1/2009

Submitted Requests - Not Approved

O R

P P A

N s

e R

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

11/1/2009

$

800,000

10/1/2009

$

3,000,000

6/1/2010

$

1,000,000

6/1/2011

$

1,300,000

$

Finch, Fish, Gravel and West 1,250,000 Saddlebag Lakes

12/1/2009

313 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Landmark Academy

Kimball Township, MI

L'Anse School District Chestonia Township

L'Anse School District Chestonia Township

L'Anse School District Chestonia Township

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing, MI

Lansing, MI

02262009

Start Date

Landmark Academy

L'Anse School District

Another building improvement listed on our energy audit is the installation of new exterior doors. The amount of heat loss in winter months because of poor weather sealing is unbelieveable.

L'Anse School District

During the summer of 2008 we had a temporary 24' x 40' building erected for storage of lawn and garden equipment as well as storage for our theater production materials. We would like to put in a foundation, slab and solar electrical system for that building. 6/1/2009

L'Anse School District

Concord currently has a large garden 40' x 800' that we irrigated with hoses and sprinklers last summer (2008). We are in desperate need of a more reliable irrigation system. The garden provides great curriculum integration as well as an outlet for service to the local community food pantries and citizens for healthy local produce. 5/1/2009

Drinking Water Infrastructure Energy Efficiency Improvements

One of the largest electric users in a City environment is the drinking water system, with much of the energy usage on-peak. This project includes the installation of energy efficiency improvements in all aspects of the drinking water transmission and distribution system, including variable frequency drive motors on wells (the BWL has 122 14” wells), wellhead pre-conditioning and high efficiency high speed pumps (often 1,000 horsepower each).

$

6,500,000

Smart Grid Investment

Invest in advanced relaying, metering & communications at the 138 and 13. 2 kv substations to allow more efficient utilization of transmission & distribution system, improve distribution reliability & enable deployment of distributed generation. This investment supports the overall goal of utilizing distributed, renewable energy sources within a metropolitan area. Program targets 65% of substations for investment based on reliability needs & potential for distributed generation options.

$

12,500,000

This project involves the deployment of distributed solar generation technologies throughout the Lansing area. The project will include the installation of multiple solar installation and technologies in the 1Kw to 20Kw size range to be located on buildings in various downtown areas and larger ground level installations in the 50Kw to 100Kw range located strategically where the current land size, land uses and transmission and distribution infrastructure best supports the utilization of large solar installations.

$

2,000,000

Interconnect the Lansing Board of Water and Lights electric distribution system to a landfill methane electric generation facility located outside the Lansing service territory. This project will allow Lansing to interconnect with the production facility in order to take advantage of the facility as a renewable energy source and to meet renewable energy portfolio standards.

$

2,000,000

t i m

ub

Landfill Gas Interconnection

N s

st

e u

q e R

P P A

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

D VE

5,400,000

T O

8/30/2009

Funding Request

$

Solar Power Deployment

S

Project Description

In June 2009 Landmark Academy intends to purchase a nine-year old, 100,000 square foot building for use as a middle school and high school. The building is located adjacent to the existing elementary building and is currently being leased by the academy. Plans include the renovation of the first floor to maximize classroom space and the construction of a full-size, hgh-school gymnasium. The project will take approximately 12 weeks to complete. Plans are being prepared for submission to the State of Michigan for approval. 6/15/2009

d e tt

Lansing, MI

Lansing, MI

Project Name

Expected Completion Date

7/1/2009

6/1/2009

314 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lansing Board of Water & Light

Lansing, MI

Project Name

Project Description

Start Date

AMI Advanced Metering Initiative

This project involves the replacement of traditional metering with advanced metering infrastructure (AMI). AMI allows two way communications with customers, improves system reliability, reduces system losses, and supports distributed generating technologies. AMI represents a significant component of smart grid applications and will be important in promoting distributed renewable generation options. Project represents first phase of AMI system for approximately 96,000 electric, 55,000 water meters and 200 steam meters. This phase will include installation of networking infrastructure, billing and customer information systems to store and process data to allow for end use product for customers to measure energy efficiencies measures per meter. First phase include conversion of approximately 32,000 meters.

Biomass & Biofuel Injection Systems for Conventional Coal Plant Conversion

This project includes the installation of equipment and materials to allow biomass fuels to be utilized in a conventional pulverized coal fired boiler. Burning biomass fuels (produced using various waste products) will reduce the amount of coal burned and the associated greenhouse gas emissions and produce renewable energy in the process. The project will support the burning of biomass fuels utilizing various mechanical systems to provide a safe and efficient combustion process without any associated loss of existing generating capacity. This project also involves the co-firing of a conventional pulverized coal generation unit with biodiesel to generate renewable energy using existing generation assets. The project infrastructure would include loading/unloading facilities for handling large quantities of bio-diesel, inside storage including agitated tank systems to prevent the bio-diesel from gelling, and bio-diesel injection guns. A majority of the power plants in the U.S. utilize pulverized coal fired boilers and this technology would have widespread application throughout the utility industry if proven viable.

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing, MI

Lansing, MI

Plug-In Hybrid Vehicle Infrastructure & Fleet

Lansing, MI

d e tt

t i m

Wind Turbine Deployment

O R

Funding Request

21,000,000

$

4,800,000

This project includes the replacement of all 40 light-duty in-town fleet at the public power system, plus 20 additional City of Lansing vehicles with hybrid plug-in electric vehicles and the infrastructure to charge the vehicles.

$

7,000,000

This project implements a strategy to capture wind energy in and around the Lansing metropolitan area. The project will make use of different sizes and types of wind turbines to properly fit the best wind duration/intensity locations within the Lansing metropolitan area. Eight to ten windmills will be 5 to 20 Kw vertical machines that are designed for siting on buildings and other structures within a downtown area. Six additional windmills will be larger, 250 kW, placed strategically to take advantage of elevated topology and high impact wind duration/intensity locations within the Lansing area. The projects are designed to capture the benefit of distributed renewable energy sources within a metropolitan area for the supply of electric power and to utilize existing transmission and distribution infrastructure.

$

7,000,000

N s

st

e u

q e R

P P A

Route (Infrastructure Only)

D VE $

T O

Lansing Board of Water & Light

Expected Completion Date

b u S 02262009

Submitted Requests - Not Approved

315 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lansing Economic Development Corporation Lansing Township Lansing Township Lansing Township Lansing Township Lansing Township

Lansing Township

Project Name

Start Date

City of Lansing Charter Township of Lansing Charter Township of Lansing Charter Township of Lansing Charter Township of Lansing Charter Township of Lansing

Construction of an outdoor community events venue at Adado Riverfront Park to accommodate ethnic and cultural festivals, outdoor symphony and theater performances, the Common Ground Music Festival and national touring acts. The design includes a stage area with production support structure, roof, stage and dressing room. The amphitheater will be the catalyst for the development of an increased number and diversity of events and festivals along Lansing's downtown riverfront. Possible new festivals and events include Diversity Fest, Cinco de Mayo Fest, October Fest, Symphony in the Park, BoarsHead Theater, Riverwalk Theater and LCC Theater Department performances. Existing Events that would benefit include the Common Ground Music Festival, 4th of July Celebration/fireworks, Lansing Park Events, Board of Water & Light Chili Cook Off, "Be a Tourist in Your Own Town", Silver Bells in the City and others. Benefits of a new amphitheater include: Increased crowd capacity on the west side of Adado Riverfront Park, thus allowing larger events Adado Riverfront Park Amphitheater to be held on the grounds. Present capacity os 12,000 and the proposed capacity wo7/1/2009 Safety and Energy Efficient Upgrades at Fire Exposed wood siding and soffits would be covered with energy efficient vinyl siding Station 52 including new exterior insulation. 6/1/2009 Safety and Energy Efficient Upgrades at Fire Station 52 Replace current roofing with heavy duty, energy efficient shingles. 6/1/2009 Safety and Energy Efficient Upgrades at Fire Station 52 Replace current lighting fixtures with modern, energy efficient fixtures. 6/1/2009 Safety and Energy Efficient Upgrades at Fire Station 52 Replace front drives with reinforced concrete to support modern apparatus weights. 6/1/2009 Purchase 2009-2010 Spartan/Crimson fire truck with 1750 gpm Waterous pump, 6 New Ladder Truck person cab with 103 foot mid-mount Ladder tower or platform. 4/1/2009

Charter Township of Lansing

New facility would be constructed to be a 4 bay, energy efficient building, with ample square footage to house current apparatus including aerial device, living and sleeping quarters for 5 on-duty personnel (approximately 4000 Sq. Ft.) plus the office of the Fire Chief. Approximately 4000 Sq. Ft. 6/1/2009

T O

Construction of New Central Fire Station

d e tt

Lansing Township

Project Description

ub

t i m

Charter Township of Lansing

Biosolids to Electricity Renewable Energy Powerplant

s t s

-N

e u

q e R

Expected Completion Date

P P A

O R

Funding Request

D VE

11/1/2009

$

1,900,000

11/1/2009

$

4,500

11/1/2009

$

5,000

11/1/2009

$

8,000

11/1/2009

$

24,000

12/31/2009

$

800,000

11/9/2009

$

2,000,000

$

20,000,000

This project seeks to address several challenges. The project would be constructed on an existing brownfield that was created after the 2 General Motors plants were closed in 2005. Those facilities are currently under demolition, and the resulting loss of property tax revenue has placed extreme stress on the Township general fund. With tax incentive programs available at the State level, and grant and low interest loan opportunities made available through US EPA and other sources, this project would become the center of a "sustainable" light industrial/R&D mixed use development. The EDC would act as the developer, but would seek partnership with public research institutes (e.g. Michigan State University) and private commerical concerns in an effort to catalyze further research into renewable energy generation and its commercial application. The resulting benefits are 1) redevelopment of vacant/underutilized land in the urban core of the Lansing region, 2) revenue for the local unit of government to provide public services to its citizens, 3) enabling local utilities to meet and exceed Renewable Energy Portfolio Standards requirements, 4) eSeptember, 2009 June, 2011

Route (Infrastructure Only)

S 02262009

Submitted Requests - Not Approved

316 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lansing Township

Charter Township of Lansing

Project Name

Project Description

Start Date

Eastwood Development

The Charter Township of Lansing, who is the only community in the Nation to experience the concurrent shuttering and loss of approximately 1,700 jobs at two General Motors plants (Craft Center and Metal Fabrication) since 2005. Both plants totaling 2,900,000 square feet are currently being demolished, causing a decrease of nearly 15% in the Township's general fund and an approximate 95% reduction of industrial buildings within the Township. These tax dollars will likely not be replaced in this current economy without initiatives such as this immediate project. Development of public infrastructure (water, sanitary sewer, storm drains, public transit shelters and pederstrina linkages) to support $28,000,000 in 240,000 square feet of medical office and general office/service development. May, 2009

Groesbeck Park Drain

The Charter Township of Lansing, who is the only community in the Nation to experience the concurrent shuttering and loss of approximately 1,700 jobs at two General Motors plants (Craft Center and Metal Fabrication) since 2005. Both plants totaling 2,900,000 square feet are currently being demolished, causing a decrease of nearly 15% in the Township's general fund and an approximate 95% reduction of industrial buildings within the Township. These tax dollars will likely not be replaced in this current economy without initiatives such as this immediate project. Establishment of low impact development ponds and wetlands to comport with the Federal Clean Water Act's National Pollutant Discharge Elimination System (NPDES) Phase II storm water quality while providing a connection to an outlet to the Grand River. There are at least two medical office users totaling 130,000 square feet who wish to develop and are on hold until this project is completed. Furthermore 85,000 square feet of the proposed medical office building development is located within the highest priority area (qualified-distressed) for the New Markets Tax Credit Program pre the CommunitMay, 2009

T O

Lansing Township

Charter Township of Lansing

O R

Funding Request

D VE

September, 2009

$

31,000,000

N s

May, 2010

$

32,000,000

September, 2010

$

52,500,000

Lansing Township

Charter Township of Lansing

Eastwood Hospitality Center

The Charter Township of Lansing, who is the only community in the Nation to experience the concurrent shuttering and loss of approximately 1,700 jobs at two General Motors plants (Craft Center and Metal Fabrication) since 2005. Both plants totaling 2,900,000 square feet are currently being demolished, causing a decrease of nearly 15% in the Township's general fund and an approximate 95% reduction of industrial buildings within the Township. These tax dollars will likely not be replaced in this current economy without initiatives such as this immediate project. Development of public infrastructure (water, sanitary sewer, storm drains, public transit shelters and pederstrina linkages) and LEED certified efforts to support $45,000,000 for a hospitatlity development that includes 250 hotel rooms, 27,000 square feet of conference center and destination waterpark. August, 2009

Lansing Township

Charter Township of Lansing

2009 DWRF Waverly Road Water Main

Replacement of 55 year old/defective water main in Waverly Road, from St. Joseph to Michigan and Saginaw to Willow; and Kalamazoo Street, from Waverly to Clement 6/9/2009

11/9/2009

$

Patrol Vehicle Digial In-Car Camera System

Digital In-car cameras would promote and protect the safety and integrity of the community and the Police Officers that serve it. All entities involved would be assured of an accurate accounting of their contact during a traffic or arrest investigation. The evidence that would be available through the digital recording would allow for a higher conviction rate of offenders involved in alcohol and/or drug investigations stemming from traffic encounters. This would decrease the amount of time an officer is off the road and in the courtroom. In the event that there is a complaint made alleging a wrongdoing by the officer, the evidence from the system would allow the investigation to be completed more efficiently and accurately. Gathering and downloading the digital evidence could be done quickly and transmitted electronically allowing a more timely resolution for both prosecution and internal purposes. 6/1/2009

9/1/2009

$

d e tt

q e R

it

m b u

S Lansing Township

Charter Township of Lansing

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

st

e u

Expected Completion Date

1,500,000 Waverly Road

40,000

317 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

New facility would be constructed to be a 4 bay, energy efficient building, with ample square footage to house current apparatus including aerial device, living and sleeping quarters for 5 on-duty personnel (approximately 4000 Sq. Ft.) plus the office of the Fire Chief. Approximately 4000 Sq. Ft. 6/1/2009

Lansing Township

Charter Township of Lansing, Ingham County

Construction of New Central Fire Station

Lansing Township

Charter Township of Lansing, Ingham County

Safety and Energy Efficient Upgrades at Fire Station 52 Replace current lighting fixtures with modern, energy efficient fixtures.

6/1/2009

Lansing Township

Charter Township of Lansing, Ingham County

Safety and Energy Efficient Upgrades at Fire Station 52 Replace current roofing with heavy duty, energy efficient shingles.

6/1/2009

Lansing Township

Charter Township of Lansing, Ingham County

Safety and Energy Efficient Upgrades at Fire Station 52 Replace front drives with reinforced concrete to support modern apparatus weights.

6/1/2009

Lansing Township

Charter Township of Lansing, Ingham County

Safety and Energy Efficient Upgrades at Fire Exposed wood siding and soffits would be covered with energy efficient vinyl siding Station 52 including new exterior insulation.

Lansing Township

Charter Township of Lansing, Ingham County

New Ladder Truck

Purchase 2009-2010 Spartan/Crimson fire truck with 1750 gpm Waterous pump, 6 person cab with 103 foot mid-mount Ladder tower or platform.

Lansing Township

Charter Township of Lansing, Ingham County

2009 DWRF Waverly Road Water Main

Replacement of 55 year old/defective water main in Waverly Road, from St. Joseph to Michigan and Saginaw to Willow; and Kalamazoo Street, from Waverly to Clement 6/9/2009

Lansing Township

Charter Township of Lansing, Ingham County

Groesbeck Park Drain

$

2,000,000

$

8,000

$

5,000

11/1/2009

$

24,000

6/1/2009

11/1/2009

$

4,500

4/1/2009

12/31/2009

$

800,000

11/9/2009

$

May, 2010

$

32,000,000

The Charter Township of Lansing, who is the only community in the Nation to experience the concurrent shuttering and loss of approximately 1,700 jobs at two General Motors plants (Craft Center and Metal Fabrication) since 2005. Both plants totaling 2,900,000 square feet are currently being demolished, causing a decrease of nearly 15% in the Township's general fund and an approximate 95% reduction of industrial buildings within the Township. These tax dollars will likely not be replaced in this current economy without initiatives such as this immediate project. Development of public infrastructure (water, sanitary sewer, storm drains, public transit shelters and pederstrina linkages) to support $28,000,000 in 240,000 square feet of medical office and general office/service development. May, 2009

September, 2009

$

31,000,000

The Charter Township of Lansing, who is the only community in the Nation to experience the concurrent shuttering and loss of approximately 1,700 jobs at two General Motors plants (Craft Center and Metal Fabrication) since 2005. Both plants totaling 2,900,000 square feet are currently being demolished, causing a decrease of nearly 15% in the Township's general fund and an approximate 95% reduction of industrial buildings within the Township. These tax dollars will likely not be replaced in this current economy without initiatives such as this immediate project. Development of public infrastructure (water, sanitary sewer, storm drains, public transit shelters and pederstrina linkages) and LEED certified efforts to support $45,000,000 for a hospitatlity development that includes 250 hotel rooms, 27,000 square feet of conference center and destination waterpark. August, 2009

September, 2010

$

52,500,000

T O

s t s

-N

11/9/2009

Funding Request

11/1/2009

P P A

O R

May, 2009

11/1/2009

D VE

Route (Infrastructure Only)

1,500,000 Waverly Road

e u

Lansing Township

Charter Township of Lansing, Ingham County

Eastwood Development

tt i m

Lansing Township

b u S

Charter Township of Lansing, Ingham County

02262009

d e t

Eastwood Hospitality Center

q e R

Submitted Requests - Not Approved

318 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Patrol Vehicle Digial In-Car Camera System Recreation Plan

Bike Racks

Recreation Plan

Swing set

Recreation Plan

BBQ's

Recreation Plan

ADA material

Recreation Plan

Picnic tables.

Recreation Plan

Pavilion

Recreation Plan

Playground structure

Recreation Plan

Construction of walk path.

Lapeer Township Lathrup Village Lathrup Village

Lathrup Village

Manhole Rehab

Lathrup Village

Lathrup Village

Disconnect Footing Drains

Lathrup Village Lathrup Village Lathrup Village Lathrup Village Lathrup Village

Lathrup Village Lathrup Village Lathrup Village Lathrup Village Lathrup Village

Reconstruct DPW Lot Water System Hydraulic Improvements Pavement Rehab Pavement Rehab Water Main Replacement

Lathrup Village Lathrup Village

Lathrup Village Lathrup Village

Lapeer Township Lapeer Township Lapeer Township Lapeer Township Lapeer Township Lapeer Township Lapeer Township Lapeer Township

Lee Township

Lee Township

02262009

Broadband Internet Service Geothermal Update

tt i m

ub

S

Start Date

Digital In-car cameras would promote and protect the safety and integrity of the community and the Police Officers that serve it. All entities involved would be assured of an accurate accounting of their contact during a traffic or arrest investigation. The evidence that would be available through the digital recording would allow for a higher conviction rate of offenders involved in alcohol and/or drug investigations stemming from traffic encounters. This would decrease the amount of time an officer is off the road and in the courtroom. In the event that there is a complaint made alleging a wrongdoing by the officer, the evidence from the system would allow the investigation to be completed more efficiently and accurately. Gathering and downloading the digital evidence could be done quickly and transmitted electronically allowing a more timely resolution for both prosecution and internal purposes. 6/1/2009

Charter Township of Lansing, Ingham County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lapeer Township, Lapeer County Lathrup Village

Lansing Township

Project Description

Saniatary Sewer Lining Pavement Recontruct

d e t

T O

s t s

Expected Completion Date

P P A

O R 9/1/2009

-N

e u

q e R

Tower #1 in system, 1-150' - 175' tower Replace old enrgy wasting heating cooling system with geo-thermal system Rehab 616 manholes to reduce infiltration and improve condition to Comply with Cour Order Disconnect 1,300 Footing Drains from Sanitary Sewer System to eliminate SSO'S and Comply with Court Order Reconstruct crumbling DPW lot, will aid with BMP for stormwater regarding salt storage and use Upgrade old 1920's water main. Replace 3.76 miles of main Local Street Pavement Rehabilitation Major Street 11 Mile Pavement Rehabilitation Replace 3 miles of Old water main as part of County Project Reline 80,000 feet of existing clat pipes due to age, condition and infiltration to comply with Court Order Reconstruct 10 miles of local roads

Replacement of a failed twin culvert with an 80' long by 6' rise by 16' span culvert. The culvert failed due to age and large flood events in 2008. 102nd street is a county primary road that is used extensively for local agriculture and industry. The road is currently closed and the detour is approximately 2 miles. The Township does not 3/1/2009 102nd Street Culvert over Brush Creek Drain have a road millage or the funds to complete the repair.

Submitted Requests - Not Approved

6/1/2009

Funding Request

Route (Infrastructure Only)

D VE $

40,000

$

300

$

1,800

$

2,360

$

4,000

$

6,800

$

15,000

$

31,000

$

65,000

$ $

95,000 602,682

$

368,000

$

14,144,000

$ $ $ $ $

248,000 2,977,000 3,710,000 1,364,000 2,914,000

$ $

4,037,500 10,050,000

$

183,000 102nd Street

319 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lee Township

Leelanau County

Lee Township

All 11 townships & 3 villages in the County

Project Name

Project Description

Start Date

Expected Completion Date

Township Hall and Fire Station

Construction of a new Township Hall and Fire Station. The existing facilities are outdated, too small, not energy efficient, cannot accommodate the existing and needed equipment. The new facility would consolidate the services, improve efficiencies, reduce operating costs and provide a long term solution to the existing problems.

Rural Broadband Initiative

Providing wireless broadband services for Leelanau County. Leelanau County has begun deploying wireless broadband services thru several privately funded companies. These companies have prepared business plans and are ready to expand service to up to 65% of the County residents. These companies need assistance thru low/negative interest loans and/or public tower construction to implement their business plan. With local government support for establishing tower sites and allowing broadband deployment via private industry, Leelanau County can attract new jobs for it's full time residents. This would also provide it's seasonal residents with the ability to "telecommute" thus improving the local business economy This project would also include the development of 8-9 new tower sites in the county, and leasing of land for these tower sites. These sites and new towers are necessary for public safety (9-1-1 services) as well as increased power to utilize the latest technology in telecommunications with the least impact on the environment. The County's initiative is to increase connectivity and coverage of broadband, and 9-1-1 ca1/1/2009

Purchase of SugarLoaf Resort & Position for Redevelopment

T O

11/1/2009

7/1/2010

O R

Funding Request

D VE $

Route (Infrastructure Only)

500,000 NA

P P A

12/31/2010

$

2,740,000

Once the County's major employer and the finest ski area in Michigan, Sugar Loaf Resort closed in 2000 and remains vacant. The loss of the resort, lodging, skiing, and recreational activities, has been devastating. Elimination of year?round and seasonal jobs has negatively impacted families and local businesses. The REsort has been vandalized, and signs of mold are evident. Sewer damage occurred from a shut off malfunciton; causing waste to flow into the basement. In 2007, the Health Departmen declared the lodge 'unfit for human habitation' and placed a ban on occupancy. It is suspected there have been leaks and contamination from fuel and chemicals stored onsite. The property is stagnant, with no increase in value and a loss of tax revenue. Surrounding properties have decreased in value, with lower selling prices. The County has placed itself in a positive position for acquisition and redevelopment. There is an active County Economic Development Corporation, Brownfield Redevelopment Authority, and Land Bank Fast Track Authority, and the County has received 2 EPA site assessment grants. The Land Bank Authority is requesting $6 mi 5/1/2009

April 30 2011

$

6,500,000

The Leelanau County Land Bank Fast Track Authority requests $1.5 million to acquire and $2.5 million to improve the wastewater treatment system located at the SugarLoaf Resort, Cleveland Township, Leelanau County, Michigan. The current system needs updating and expansion to protec tthe environment and accommodate development a the site. The Authority is proposing the development of a state-of-the-art, innovative system incorporating advanced technologies with a 'green' and sustainable design. The proposed system is both cost effective and meets these goals. The proposed wastewater treatment system is a wetland based treatment facility using below surface flow. The system consists of a minimum of 2 septic tanks in series to provide pretreatment prior to discharge to a two-step wetland treatment/polishing system. The wetland system consists of constructed lined cells that provide treatment and unlined cells that provide polishing using the establishment of plants. The effluent from the las wetlands is then dispersed into the ground. A pressure force main will be used to transport the sewage from homes and resort structures to the treatment system. It is o5/1/2009

April 30 2011

$

4,000,000

11/15/2009

$

N s

t s e

Leelanau County Brownfield Redevelopment Authority

Cedar, MI Cleveland Township

R d

e t t

t i m

b u S

u q e

Leelanau County Land Bank Fast Track Cedar, MI Cleveland Authority Township

Sugar Loaf Septage Treatment Purchase/Upgrade

Lenawee County Road Commission Lenawee County

Weston Road Berkey to Riga Hwy single lift of Asphalt to complete Class A all season classification Structural Improvements

02262009

Submitted Requests - Not Approved

6/1/2009

174,504 Primary

320 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Lenawee County Road Commission Lenawee County Lenawee County Road Commission Lenawee County Lenawee County Road Commission Lenawee County

Pavement on newly graded Ottawa Lake RoadBetween Riga Hwy and Rodesiler Hwy 2 Miles Repave Previously Pulverized Federal Aid Eligible Road Springville Hwy Plank Road Benner Hwy Mill and Fill Culvert Replacement Structural Improvements/Preventive Maintainance Wedge and Seal Coat various County Primary Roads Structural Improvements/Preventive Maintainance

Lenawee County Road Commission Lenawee County

Rogers Hwy and Rouget Road Mill and Fill Between US 223 and Tecumseh City Limits. 9.81 Mile

Structural Improvements/Preventive Maintainance

6/1/2009

Lenawee County Road Commission Lenawee County

Deerfield Rd, Parr Hwy to Deerfield Village Limit, Mill and Fill, Stearns and Kingsbury to Deerfield Village Limits. 12.15 Miles

Structural Improvements/Preventive Maintainance

6/1/2009

Lenawee County Road Commission Lenawee County Lenawee County Road Commission Lenawee County

Weston Rd Pence to Berkey Hwy Total Reconstruction Per Plans 5.09 Miles Class A All Season Connector Total Reconstruction, To Class A All Season Standards Remove and Replace Bentoak Highway Bridge Remove and Replace Bent Oak Highway Bridge Sutton Road from Occidential Hwy to Raisin Center Hwy. Reconstruct to Class A All Season Standards

Lenawee County Road Commission Lenawee County Lenawee County Road Commission Lenawee County

Lenox Township

Lenox Township

Lenox Township

Lenox Township Lenox Township

Lenox Township Lenox Township Lenox Township

Lenox Township Lenox Township

s

Chesterfield Water Interconnection

Lenox Township, Macomb County County Connector Phase 1 Pathway

st

O N

Construction of new 16" watermain that is needed as an emergency interconnection for Lenox & Chesterfield Townships

e u

Approximately 2.25 miles of paved, multi-use pathway 10-feet wide constructed to AASHTO guidelines

eq

R d

Lenox Township, Macomb County County Connector Phase 3 Pathway

e t tt

Lenox Township, Macomb County County Connector Phase 2 Pathway Lenox Township, Macomb County Wetland Mitigation Bank

i m

ub

Lenox Township, Macomb County Water Meters Replacement Lenox Township, Macomb County Lenox Recreation Park Improvements Lenox Township, Macomb County DPW Complex Expansion

S

Lenox Township, Macomb County SCADA Lenox Township, Macomb County Lenox PRV Station 1 Rehab

02262009

6/1/2009

11/15/2009

6/1/2009

11/15/2009

6/1/2009

11/15/2009

Approximately 2.5 miles of paved, multi-use pathway 10-feet wide constructed to AASHTO guidelines

Approximately3 miles of paved, multi-use pathway 10-feet wide constructed to AASHTO guidelines Construction of mitigated wetland for future impacts (Salt River watershed) to also serve an outdoor environmental classroom and walking pathway

Replacement of 150 water meters due to deterioration

Funding Request

$

260,000 Primary

D VE

385,871 Primary

$

555,000 Primary

$

836,000 Primary

11/15/2009

$

1,036,554 Primary

6/1/2009

11/15/2009

$

3,308,500 Primary

6/1/2010

11/14/2010

$

550,000 Local

6/1/2010

11/15/2010

$

995,000 Primary

6/1/2010

11/15/2010

$

1,240,000 Primary

6/1/2009

8/1/2009

$

26 Mile Road West 60,000 of I-94

$

Township Civic Center to Macomb Orchard Trail in 1,130,000 Richmond

$

Wetzel State Recreation Area to Village of New 1,250,000 Haven

PP

O R

6/1/2009

6/1/2009

11/15/2009

11/1/2009

11/1/2009

6/1/2009

11/1/2009

$

5/1/2009

11/1/2009

$

6/1/2009

10/1/2009

$

Rehabilitation of existing Hockey Rink, Basketball & Tennis courts 6/1/2009 Expansion of public service complex (DPW / EMS / FD) including a staging area and training facility 6/1/2009

12/1/2009

$

12/1/2009

$

Construction of new SCADA system that is needed to aid the Township in the operation & maintenance of the existing water & sewer trunklines

6/1/2009

12/1/2009

$

Replacement of 3 old PRVs due to deterioration

6/1/2009

9/1/2009

$

Submitted Requests - Not Approved

Route (Infrastructure Only)

$

A T

Total Reconstruction, To Class A All Season Standards

Remove and Replace Benner Highway Bridge Remove and Replace Benner Highway Bridge

Lenox Township / Chesterfield Township, Macomb County

Expected Completion Date

Township Civic Center to Village of New Haven Park 1,500,000 on Haven Ridge Gratiot Ave at 29.5 2,400,000 Mile Various local locations in Lenox 37,500 Township Lenox Township 120,000 Park Gratiot Ave at 27.5 140,000 Mile Various local locations in Lenox 350,000 Township 26 Mile Road West 420,000 of I-94

321 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Lenox Township

Lenox Township, Macomb County Frost Road Watermain Extension Lenox Township, Macomb County Booster Station

Extension of 16" watermain to provide a second feed to the northerly portion of the Township and add redundancy to the water system Construction of new Booster Station that is needed to help meet the demand of the northerly portion of the Township

Lenox Township

Lenox Township

Expected Completion Date

6/1/2009

11/1/2009

6/1/2009

11/1/2009

Lenox Township, Macomb County Lenox Water Storage Tank

Construction of 500,000 gallon water storage tank per DWSD service agreement that will provide adequate pressures to the northern portion of the Township 6/1/2009

11/1/2009

Lenox Township

Lenox Township, Macomb County 30 Mile Road Watermain Extension

Construction of new 16" watermain along easterly portion of the Township adding looping and redundancy to the water system

Lenox Township

Lenox Township, Macomb County 29 Mile Road Sanitary Sewer Extension

Construction of new 18" sanitary sewer provide service to the existing landfill and loca properties 6/1/2009

Lenox Township

Lenox Township, Macomb County 27 Mile Road Sanitary Sewer Extension

Construction of new 18" sanitary sewer provide service to proposed 2 subdivisions and local properties

Lenox Township

Lenox Township, Macomb County Line Road (26-27) Watermain County Extension

Extension of 16" watermain to the northerly portion of the Township and add redundancy to the water system

Lenox Township

Lenox Township, Macomb County Line Road (29-21) Watermain County Extension

Construction of new 16" watermain along easterly portion of the Township adding looping and redundancy to the water system

A T

s

t s e

O N

u q e

O R

6/1/2009

PP

6/1/2009

6/1/2009

6/1/2009

6/1/2010

6/1/2010

6/1/2010

6/1/2010

12/1/2010

Funding Request

$

Frost Road from 26 Mile to 27 Mile 1,300,000 Road Gratiot Ave at 29 1,400,000 Mile Road

$

Gratiot Ave at 30 1,420,000 Mile Road

$

30 Mile Road from County Line to 1,480,000 Gratiot

$

29 Mile Road from Gratiot Ave one 2,590,000 mile east

$

27 Mile Road from Gratiot Ave one 2,590,000 mile east

$

County Line Road from 26 Mile to 27 2,780,000 Mile Road

$

County Line Road from 29 Mile to 31 3,700,000 Mile Road 31 Mile Road northeasterly through Lenox, Casco, Columbus & Richmond 3,850,000 Townships

$

D VE

Lenox Township

Lenox, Casco, Columbus, and Richmond Townships, Macomb County ACT425 Watermain Extension

6/1/2009

6/1/2010

$

Lenox Township

Lenox Township, Macomb Parking lot expansion. Construction of water & sewer service lines, concession stand County Lenox Park Utilities & Parking Improvements and public bathrooms 4/1/2009

6/1/2009

$

Construction of a new sidewalk extension along Washington Road that will connect existing neighborhoods to existing sidewalk on John Beers Road, allowing pedestrian access to the middle school. Project includes approximately 5,000 feet of sidewalk from Marquette Woods Road to John Beers Road. 7/15/2009

9/15/2009

$

300,000

Lincoln Charter Township, Roosevelt/Marquette Woods Non-motorized Berrien County Trail Extension

Construction of an extension to the Safe Routes to School trail on Roosevelt Road. Includes 2,300 feet of non-motorized trail on Roosevelt Road and a pedestrian bridge over Hickory Creek. Also includes 2,400 feet on Marquette Woods Road which will connects to existing sidewalks on Cleveland avenue, providing complete pedestrian access to the library, school and Township offices. 7/15/2009

11/15/2009

$

500,000

Petoskey, Michigan

This project will employ five individuals to initiate and complete the documentation of the artifacts and archival collections of the Little Traverse Regional Historical Society. Formed in 1905 the agency has been actively collecting material culture since the 1970s. These objects, however have never been registered, cataloged or otherwise documented. Through this project the museum will gain intellectual control over its collections and archival holdings. The creation of finding aids will allow it to improve exhibits, programming and its overall service to the community. 4/9/2009

10/11/2009

$

115,000

Lincoln Township

Lincoln Township

Little Traverse Regional Historical Society

Construction of approximately 11,000 LF of a new 16" water main that will provide service to the ACT425 Area outside Lenox Township per communities agreement

R d

e t tt

Lincoln Charter Township, Berrien County Washington Rd Sidewalk Extension

i m

b u S

02262009

Operation Documentation!

Submitted Requests - Not Approved

Route (Infrastructure Only)

Township Center at 42,000 29.5 Mile & Gratiot

322 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Little Traverse Township Little Traverse Twp Little Traverse Township Little Traverse Twp

Little Traverse Township

Little Traverse Township

Project Name

Project Description

Start Date

$

20,000

Replace old water lines

$

100,000

$

100,000

$

100,000

Replace 500 l.f. of water main in the Township's system. It is the final link of an ongoing project to replace a deteriorated water system that is over 70 years old. Included is replacement of two old fire hydrants no longer serviceable.

5/1/2009

Little Traverse Township, Water System Radio SCADA Network Emmet County system.

Includes 900 MHz radio monitoring and control system including towers, radios, computer monitors, and security camera equipment. The project is necessary to improve iperating efficiency by reducing travel time, automate alarm reporting, and increasing water supply security at two source locations.

5/1/2009

Genoa and Howell Townships

Livingston County Livingston County

Howell Howell/ Hartland

$

10,800,000

Repair and Replace Parking Lot, Storm Drains and Site Lights.Replace current site lighting MV/HID/MH Replace with LED. LED lights are considered ”green” - they save maintenance cost and energy.

$

700,000

A Multi-jurisdictional Response and Training Complex: 1. To provide an emergency response location for EMS, Fire and Aero medical services thus improving response time and quality care to the citizens of Livingston County. 2. To prepare all Public Safety Agencies with the appropriate initial and reoccurring training for EMS, Fire, 911 and Law enforcement. Training would be available to meet all Homeland Security, Bio Terrorism and Emergency Management training requirements. Our purpose would be to make available any Public Safety Training to all disciplines at one local location and at a reasonable cost.(See attached list for training possibilities) 3. Headquarters for the Livingston County Medical Examiner. 4. Future site of Fire Rescue response to the Livingston County Airport. 5. Location of Medrun drug cache. 6. Potential location of National Strategic Stock Pile drug cache. 7. Location for Mass Fatality storage ( airport, local and Regional) 8. Location for prophylaxis treatment in event of Pandemic Flu 9. Location of the Livingston County Mobile Command Unit 10. Location of Region 1 Bio Terrorism Communications Trailer

$

14,000,000

$

1,500,000

02262009

ub

S

P P A

LIVINGSTON COUNTY EAST & WEST COMPLEX PARKING LOT & SITE LIGHT REPLACEMENT

t i m

Howell

O R

Howell Opera House Preservation and Adapted Re-use

d e tt

Livingston County

D VE

Oct. 1, 2009

The Opera House in Howell, an historic building housing an original 1881 theatre, was purchased by the Livingston Arts Council in 2000 with the mission to preserve and adapt it for re-use for performance, education and cultural events. The Livingston Arts Council (LAC), a non-profit arts and cultural organization, provides a variety of quality programs and activities for all ages in the community. In 2007 a Masterplan was completed by renowned preservation architects with a three phase process. Phase I was completed in May 2007 with the renovation of the first floor level for $2M, $1.6M of which was private donations. The Livingston Arts Council is now seeking capital resources to fund the final Phases of construction. The Masterplan estimated project cost in 2006 for Phase II as $8.8 million. Phase II includes: - upgraded electrical system - new sprinkler system - box office, catering kitchen, theater storage exterior restoration including windows - passenger elevator - upgraded heating and cooling system - entire building structural reinforcement - restoration of theatre and stage and balcony (2nd and 3rd floors of building) - addition to building and fire rated s2/15/2009

T O

Livingston County

Funding Request

Scada system on water system

Little Traverse Township, Emmet County Township Water main

Livingston Arts Council (The Opera House) City of Howell

Expected Completion Date

LIVINGSTON COUNTY EMS PUBLIC SAFETY COMPLEX Latson Rd. Interchange/ I 96- HowellI 96 Exit/Entrance M 59 Expansion

st

e u

q e R

N s

To provide a cloverleaf exit/entrance ramp at the Latson Rd. Interchange. Complete expansion from Oak Grove to Hartland

Submitted Requests - Not Approved

October, 2010

Route (Infrastructure Only)

323 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Livingston County Livingston County

LIVINGSTON COUNTY Howell Township

Project Name

COUNTYWIDE BROADBAND FIBER PROJECT Livingston Regional Airport

Project Description

Start Date

Livingston County needs a high speed, large capacity broadband fiber network to connect the Sheriff’s Department with all local Police Departments, EMS, Central Dispatch and Fire Departments in the county. The fiber project is design to connect all existing school district intra-district fiber and the county’s fiber to complete a continuous loop around the county. This fiber backbone will be available for both emergency management and the schools to enhance communications and take advantage of other savings through shared services. Feb. 30 Continued expansion with cross wind runway

Livingston County Board of Public Works Handy Township

Handy Township is located in the County of Livingston , Michigan. To prepare for growth along it’s main corridor an agreement was reached with neighboring Village of Fowlerville, whereas Handy Township purchased capacity in their waste water treatment plant. In addition, approximately 7500 LF of sanitary sewer, 2500 LF of sanitary force main and a sanitary pump station was constructed. Funding is being sought for the remainder of the Project. This work consists of approximately 1000 LF of 12" sanitary sewer, 1400 LF of force main and four- 4' dia. sanitary manholes. The Handy Township Infrastructure Improvements work will take place in Section 8, Handy Township, County of Livingston in the State o West Grand River Sanitary Sewer Project Michigan. 5/9/2009

Livingston County Drain

Conway No. 1 Drain

Replacement of decaying culvert under Sherwood Road on the Section Line between Sections 21 & 28, Conway Township, Livingston County (T4N, R3E) 5/9/2009

Sunrise Park Drain

Conway Twp.

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE $ $

1,500,000 2,000,000

Along the southerly side of West Grand 397,500 River Ave.

9/9/2009

$

6/9/2009

$

This project, located in Sections 4 & 9 of Genoa Township, Livingston County (T2N, R5E), was petitioned by residents in 2004, and due to a backlog of work with the Drain Commissioners office has not been made ready for construction until now. The project consists of the renewal of storm sewers within the subdivision that were installed in 1950, and were previously petitioned to be replaced in the 1980’s. However the project was deemed too expensive to be assessed on top of the costs of a proposed sanitary sewer assessment and was therefore abandoned. Televising of these lines in 2006 revealed portions of metal pipes without a bottom and severe deterioration in many portions of the system. Allowing deterioration to continue will soon result in undermining of nearby homes and road infrastructure. Complete restoration of all public storm sewer (approximately 4400 feet of pipe with structures) within the subdivision would cost in excess of $1,500,000. We are currently proposing the expenditure of $500,000 to $600,000 to replace approximately 2000 feet of the most crucial deteriorated pipe with new pipe ranging in size from 12 to 18 inches in dia8/9/2009

4/10/2009

$

Generally W to E & 600,000 S to N

This project, located in Sections 22 & 23 of Handy Township, Livingston County (T3N, R5E) was petitioned by the Handy Township Board in 2006. This petition was provided in response to residents concerns regarding the operation of a decaying agricultural drainage system which was installed between 1915 and 1922. A previous attempt at proper restoration of the drainage system in the late 1990’s failed due to residential concerns over costs. At this point the drainage system has continued to deteriorate and substantial flooding of driveways to the east of Fowlerville Road threatens emergency access for several homeowners. The County Road Commission has postponed necessary work on the Fowlerville Road Crossing for the drain due to the deteriorated condition of the downstream drainage system. Approximately 925 ft. of drain tile is proposed to be replaced with 24” storm sewer to restore historical drainage service to the area, plus an additional 600 ft of open ditch excavation is proposed. Costs of the project including reconstruction of the Fowlerville Road Crossing are estimated in the range of $250,000. 8/9/2009

10/9/2009

$

Generally W to E & 250,000 S to N

s t s

-N

30,000 Generally N to S

e u

Livingston County Drain

Genoa Township

itt

m b u

S Livingston County Drain

Handy Township

02262009

Handy No. 14A Drain

d e t

q e R

Submitted Requests - Not Approved

324 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Livingston County Drain Livingston County Drain

Livingston County Drain

Livingston County Drain Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission

Project Name

Project Description

Start Date

Expected Completion Date

Howell/Howell Twp

Howell City Drain

Marion Twp.

Marion No. 3 Drain

This drain, located in the western half of the City of Howell and portions of Section 17 of Howell Township, Livingston County (T3N, R4E) was established in 1898. A series of projects over the years has improved drainage in a manner necessary to serve the expanding population of the City of Howell. However, portions of the system remain severely undersized and over aged. In 2003 the Michigan Department of Transportation partnered with the City of Howell, the Howell Public Schools, and Livingston County to replace the historical 14” tile under Grand River Avenue (Business Loop I-96) with a 54” diameter tile meeting modern urban drainage criteria. Due to litigation between the City and an adjoining property owner, a 323 foot section of the original 14 inch tile installed in 1922 remains in place. This floods significant portions of property owned by Howell Public Schools, and in September of 2008 contributed to significant flooding at the Red Cross facility in Howell, creating over $300,000 in property damage. We estimate a cost of $120,000 to remove the aging 14 inch clay tile, replace it with an equivalent length of larger pipe, and repair damage 8/9/2009 Lining or replacement of 120 ft. of aging culvert buried deeply under D-19, HowellPinckney Rd. 3/9/2009

Livingston No. 27 Drain

This project, located in Section 30 of Tyrone Township, Livingston County (T4N, R6E) was petitioned by residents to address severe erosion and remove the source of substantial sedimentation into Lake Shannon. Unfortunately approximately a decade of litigation expense involving the County Road Commission, the residents, and the developer, occurred prior to a court settlement leading to the petition. The costs for the project, which includes 740 ft. of pipe, with drainage structures and stabilization, are high due to the severity of the topography. Costs relative to the area it serves are likely to cause additional home foreclosures due to the severity of the assessments proposed. Without the project the stability of an adjoining private road will soon be in question, as well as the foundation of a nearby house will be undermined.

Hartland No. 4 Drain

Replacement of deteriorated agricultural drainage system to provide proper flood protection to lands in Section 21 of Hartland Township, Livingston County (T3N, R6E) Also allows for development of retail shopping center at intersection of M-59 & US-23. 2/9/2009

Crush and Overlay

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

10/9/2009

$

120,000 Generally E to W

4/9/2009

$

40,000 Generally E to W

N s

Tyrone Township

Cohoctah Township

Fleming

Cohoctah Township

Antcliff

Cohoctah Township

Hayner

Cohoctah Township

Gannon

t s e

270,000 N to S

8/9/2009

$

230,000 Generally S to N

8/9/2009

10/9/2009

$

Crush and Overlay

8/9/2009

10/9/2009

$

150,000 Hayner to Gannon Gannon to 275,000 Cohoctah

Crush and Overlay

8/9/2009

10/9/2009

$

280,000 Owosso to Fleming

Crush and Overlay

8/9/2009

10/9/2009

$

R d

e t tt

i m

u q e

$

Cohoctah Township

Cohoctah

Crush and Overlay

8/9/2009

10/9/2009

$

Cohoctah Township

Oak Grove

Base Repair and Overlay

7/9/2009

9/9/2009

$

325,000 Fleming to Antcliff Antcliff to Oak 700,000 Grove N Gannon to 350,000 Cohoctah

Conway Township Deerfield and Oceola Townships

Hayner

Crush and Overlay

8/9/2009

10/9/2009

$

275,000 Robb to Owosso

Argentine Road

Crush and Overlay

8/9/2009

10/9/2009

$

1,200,000 M-59 to Faussett

Handy Township

Fowlerville Road

Crush and Overlay

7/9/2009

9/9/2009

$

Putnam Township

PattersonLake Rd

Crush and Overlay

8/9/2009

10/9/2009

$

740,000 Mason to I-96 Patterson Lk to 150,000 Pinckney

ub

S

02262009

Submitted Requests - Not Approved

325 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Livingston County Road Commission Luce County EDC Luce County EDC

Location City or Township

Project Name

Project Description

Expected Completion Date

Start Date

Putnam Township

Glenbrook

Crush and Overlay

8/9/2009

10/9/2009

Putnam Township

PattersonLake Rd

Crush and Overlay

7/9/2009

10/9/2009

Tyrone Township

Fenton/Denton Hill

Crush and Overlay

8/9/2009

10/9/2009

Tyrone Township Unadilla and Iosco Townships Luce County Pentland Township

Old 23 Rehabilitation

Mill, repair joints, all-season overlay

7/9/2009

9/9/2009

Bull Run Road Luce County Industrial Park Expansion Luce County Industrial Park Expansion

Crush and Overlay Brownfield site redevelopment Extension of infraustructre to expand the County Industrial Park

8/9/2009 7/1/2009 7/1/2009

O R

P P A

10/9/2009 7/1/2010 7/1/2011

D VE

This is a $3.5 million dollar project in accordance with a thoroughly researched and detailed construction and cost analysis plan prepared by architect Rich Craig and Elzinga/Volkers Construction Services along with a five phase plan of renovation to complete the Ludington Area Center for the Arts (LACA). The LACA is a planned business anchor for downtown businesses and as such is becoming an important Cultural Economic Development component of downtown revitalization and sustainability by bringing people to town and through the preservation and creation of new jobs. The LACA will benefit the region with the addition of arts center jobs, construction jobs, downtown preservation and job growth. Also benefitting will be condo development sales and residences (40% of which are projected to be year around) residents living in and near the town center, and tourist destination Renovation of the 1892 historic former United enhancement through a full menu of visual and performing arts events. Tax base Ludington Area Arts Within 90 days of Methodist Church to become the Ludington revenue will be improved. And we are meeting with school administrators to Council/Ludington Area Center for the Arts Ludington/Pere Marquette Area Center for the Arts (LACA) coordinate support for school arts programs. With the requested money from the Econfunding approval 8/29/2011 Lyon Township, Oakland Expansion of Lyon Township's Well House along with an iron removal system. South Lyon Township County New Hudson Well Expansion Hills and Twelve Mile Road. 6/9/2009 2/10/2009 Lyon Township, Oakland Lyon Township County Pontiac Trail WM Approximately 2 Miles of Water Main. Along Nine Mile and Pontiac Trail. 6/9/2009 2/10/2009 Lyon Township, Oakland Expansion of Lyon Township's Waste Water Treatment Plant. !0 mile and Chubb Lyon Township County WWTP Expansion Roads. 6/9/2009 12/10/2009

T O

q e R

Mackinaw Power Michigan Tall Tower Study

Mackinaw Power is requesting funding to assist in the instrumentation of Michigan Police Tall Towers throughout the state with anemometers to study the wind speeds a 100 meters. We are seeking to instrument twenty (20) Police Towers throughout the state at a cost of $10,000/tower for a total of $200,000. The data derived from these anemometers will be open to the public and will provide both utility scale wind developers and smaller home wind turbine system owners the ability to initially assess the feasibility of doing a wind project in a certain area of Michigan. A similar project was undertaken by Indiana Energy Group to instrument tall towers in Indiana. This Project was done to help develop more accurate wind maps for the state. The study found that the potential for wind power generation was much higher than had been previously thought due to the tall tower studies at 100 meters. This Project will prove extremely valuable for furthering the development of wind energy projects in the State of Michigan. The Tall Tower Study will undoubtedly show that Michigan has a much higher wind capacity than many currently believe, and in turn will attract more wind de March, 2009

Sebille Manor Redevelopment - Selfridge Air National Guard Base

Sebille Manor is a housing development located inside Selfridge Air National Guard Base. This residential component has recently been shut down. Macomb County alongside Chesterfield Township would seek to redevelop this property incorporating Winter mixed-use development with residential, commercial, and public space opportunities. 2010/Spring 2010

d e tt

t i m

b u S

Mackinaw Power, LLC Grand Rapids

Macomb County

Chesterfield Township

02262009

N s

st

e u

Submitted Requests - Not Approved

Route (Infrastructure Funding Request Only) Cty Line to $ 220,000 Patterson Lk Rd Livermore to Cedar $ 950,000 Lk

August, 2009

$

1,300,000 Holtforth to Center

$

1,400,000 Faussett to Center

$ $ $

1,650,000 Wasson to Mason 1,650,000 2,920,000

$

373,500

$

3,000,000

$

3,500,000

$

21,000,000

$

200,000

326 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Chesterfield Township, Harrison Township, City of Fraser Upgrade Pump Stations

In the county's Hazard Mitigation Plan, three communities identified the need to upgrade their pump stations. Currently, sanitary sewage enters the storm system and eventually flows into Lake St. Clair, causing health & safety issues. Further, if the sewage is not allowed into the storm system it will flood residential basements. 9/9/2009

Clinton Township, Michigan

Nicholson Floodplain Easement

Macomb County Establishes New Floodplain Conservation Easement For 1 Mile Along the North Branch of the Clinton River. Conservationists in Macomb County have reason to celebrate: a 33-acre site in Clinton Township has been set aside to create a new outdoor education laboratory. To be officially designated as the James B. & Ann V. Nicholson Nature Center and Floodplain Conservation Easement, the site is located along the east banks of the North Branch of the Clinton River adjacent to the Macomb County Public Works Office off Dunham Road. The property has been relatively untouched by development and remains rich in natural flora and fauna. MCPED Senior Planner Gerard Santoro confirms that the property - located within a floodplain is home to deer, fox, Blue Heron, coyotes and raccoons. With access to the North Branch of the Clinton River, the property meets the goals of the 2007 Macomb County Recreation and Open Space Plan to increase public spaces and access to Macomb County's rivers and waterfronts. Centrally situated, the property will help to provide a link with a county-wide network of hiking/biking trails. In 2009, Macomb County Public5/1/2009

Mass Notification

Provide for the mass notification of county residents & first responders of an emergency/disaster event. System is computer based and provides notification to wireless devices.

County at-large

Conduct Power Distribution Study

Macomb County

County-wide

Rebuilding public health infrastructure means developing the capacity of the local health department and strengthening the competency of the public health workforce to implement the core functions of public health (e.g. capacity to assess health status, surveillance, and investgation of threats to public health). The health care system itself is a social determinant of health, and inadequate numbers of public health workers affect coverage and quality of care. Investment in training public health PUBLIC HEALTH WORKFORCE workers is vital to an effective prevention and health promotion system. The Training DEVELOPMENT: Public health worker training and Orientation program would focus on building and strengthening the public health workforce and expanding their functional capabilities. 10/1/2009 & orientation

Macomb County

Eastpointe, Roseville, Clinton Township, Mount Clemens Gratiot Mass Transit

Macomb County

Macomb County

Macomb County

Macomb County

Macomb County

County at-large

itt

S

Macomb County

02262009

m b u

d e t

Livable Communities Initiative

Expected Completion Date

D VE $

200,000

6/30/2010

$

800,000

9/9/2009

9/10/2009

$

275,000

Conduct a study of the electrical distribution system across Macomb County to identify who owns the power lines, which power lines are most critical in terms of customers served and which power lines experience the most outages & impact the most customers. 9/9/2009

6/10/2009

$

150,000

T O

s t s

O R

P P A

-N

e u

q e R

9/10/2009

Funding Request

Route (Infrastructure Only)

9/1/2011

Detroit Regional Mass Transit recently released a study highlighting the desirability of utilizing Gratiot Avenue for a fixed transit route from 8 Mile Road to Hall Road. Leveraging Transit appropriations under the ARRP begin construction on the infrastructure needed to support transit along Gratiot.

Gratiot Avenue

The Aging of Macomb County Study highlighted objectives that communities could undertake to make their communities more "livable" for the growing aging population. MCPED would employ funds for the Aging Services appropriation to develop resource materials for communities and private developers that incentivise incorporating Ongoing "livable community" standards into new development, redevelopment, and community Winter dependant on facilities. 2010/Spring 2010 funding

Submitted Requests - Not Approved

327 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County

Macomb County

Macomb County

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Macomb County Jail 43565 Elizabeth Road Mt. Additions & Renovations - Macomb County Clemens, MI 48043 Jail

The proposed project consists of a 288 bed addition to the current facility. The plan adds special management beds to better manage suicide risks, mental health prisoners, prisoners undergoing substance abuse detoxification and medical isolation requirements. Included also is remodeling to address operational problems and inefficiencies in the existing complex. The new mechanical and electrical system would also serve the existing complex and replace the old energy inefficient system. This work is the first part of the master plan presented in 2005.

Macomb County Parking Structure, 31 Market Street, Mt. Clemens, MI 48043

The County of Macomb has a 600-space parking structure located in the City of Mt. Clemens. The structure provides much-needed parking for employees of the Court Commence the Building and County Building, Jurors and the general public doing business within the bid process within City of Mt. Clemens. The structure is over 30 years old and requires extensive 120 days after renovation to extend its useful life and continued structural integrity. This project receipt of 12 months after would require extensive demolition of the upper levels most exposed to the weather. approval of commencement of All light fixtures within the structure would be replaced with energy-efficient fixtures. funding construction $

3,500,000

Commence the bid process within 180 days after receipt of 2 years after approval of commencement of funding construction $

13,500,000

Macomb County Parking Structure, 31 Market Street, Mt. Clemens, MI 48043

Commence the bid process within 180 days after receipt of 2 years after approval of commencement of funding construction $

O R

Parking Structure Restoration Project

Parking Structure Replacement

T O

s t s

D VE

P P A

Replacement of a 600-car parking structure located in the City of Mt. Clemens. The parking structure provides much needed parking for employees of the Court and County Buildings, jurors, the general public utilizing government services as well as doing business in the downtown area. The parking structure to include energyefficient lighting.

-N

# 1: A 20 bed residential transitional program where adjudicated juvenile delinquents are trained in high growth job categories including but, not limited to, the service industry, medical support, and building trades. Initial inverventions include testing, classroom instruction, virtual classes, work readiness and like skills with the youth progressing to industry standard job training resulting in the enventual completion of full certification in their chosen field. This program is designed to work with Macomb County temporary wards of the Court who are destined to leave court supervsion without employment readiness skills. Each youth placed into the program will be tested, assessed and counseled to determine which employment skill/interest may be best suited for the youth. Each youth will be placed into their field of interest -- paid either by the employer or as a trainee with a grant paid stipend. 5/1/2009

Route (Infrastructure Only)

82,350,000

e u

Macomb County

Macomb County

Mt Clemens

Mt. Clemens

Learn to Earn

tt i m

d e t

Juvenile Court VAV System Replacement Project

b u S

Macomb County

Mt. Clemens

Court Building Hot Water Heating System

Macomb County

Mt. Clemens

Wireless EOC Project

02262009

q e R

Replace VAV system, duct work, controls, heating coils. Variable volume boxes are inefficient and parts are obsolete. Save energy and improve air quality.

Replace the hot water heating system and domestic hot and cold system. Systems are old and deteriorating, requiring constant repair and costs. Purchase the necessary components to create a wireless Emergency Operations Center (EOC) environment.

Submitted Requests - Not Approved

$

1,015,000

Commence the bid process within 180 days after receipt of 12 months after approval of commencement of funding construction $

Ongoing

500,000

Commence the bid process within 180 days after receipt of 12 months after approval of commencement of funding construction $

500,000

9/9/2009

200,000

3/10/2009

$

328 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County

Macomb County

Macomb County

Macomb County

Macomb County

Macomb County

Project Name

Start Date

Funding Request

Wireless Macomb

provides wireless broadband service to northern tier of macomb county which lacks sufficient coverage for broadband availability as geography is rural; provides for city activity center coverage in southern urban communities to provide wireless services at government locations and to interconnect all Macomb County cities/villages/townships thru a ubiquitous broadband network for public use and for intergovernmental collaborative use.

$

4,798,400

IT Department Tenant Finish - Macomb County Clemens Center

Renovation of approximately 15,400 sq. ft. of a former strip mall to accommodate the Commence the IT Department. This project would create a centralized data center. Renovation to bid process within include architectural, structural, mechanical and electrical. Project to focus on energy-30 days after saving light fixtures, motion sensors and water-saving features. This project has been receipt of 12 months after designed and bid documents are complete and ready to distribute for solicitation of approval of commencement of bids. funding construction $

2,300,000

Clinton River

Clinton River Revival

Employing the Habitat Restoration funds in the American Recovery and Reinvestment Plan deploy a habitat restoration initiative for the Clinton River from Budd Park in Clinton Township traveling southeast through Mount Clemens and straight into Lake St Clair. This initiative will seek to unify the Six Rivers land Conservancy, Costal Zone Management initiatives at the state level, EPA, and MCPED's efforts along the Clinton River. Fall 2009

Clinton Township

Commence the bid process within 120 days after Replace and renovate heating and cooling system, roof tops, ductwork and controls. receipt of 2 years after Project includes senior citizen area and meeting hall and will save energy and improveapproval of commencement of Robert A. VerKuilen Bldg. HVAC Replacement indoor air quality funding construction $

Northern Communities

Clemens Center, 22 Market Street, Mt. Clemens, MI 48043

Clinton Twp. Michigan

Clinton Twp. Michigan

County-wide

02262009

T O

P P A

O R

Dependant on further environmental testing

t s e

u q e

R d

Imaging Vital Records

e t tt

Hi/Lo Replacement from Lp to Electric (Green)

i m

The Macomb County Archives Requires Imaging/Microfilming of permanent Vital records. The County has 37,000 Archive Banker Boxes of County Records from various departments under one roof. It also has 36,000 additional boxes at various sites through out the County. In effort to reduce our over all paper storage Imaging and microfilming should be done to accomplish a reduction of 25% of our total box record count of 73,000. It is also a means to reduce building space for record storage. This project could train displaced auto workers. A skill in computer ImagingArchival record storage. Creating marketable job skills utilized in medical, government and financial applications. 3/30/2009

Route (Infrastructure Only)

D VE

18 mos from start date for all communities

N s

b u S Macomb County

Project Description

Expected Completion Date

900,000

March 30., 2011

Central Receiving converting to Electric Hi/Lo (fork lift) from Lp/Gas Electric Hi/Lo non polluting saving every. For the year 2008 $1,358.73 was expended on Lp gas for existing Hi/Lo. Through replacement of Lp/gas zero emmissions will be realized. Enclosed are quotations for 2 electric Hi/Lo's. The quote represents an each price of $36,787.

Cancer is the second leading cause of death in Macomb County. Colorectal cancer is 4th most commonly diagnosed cancer; it affects both genders and ranks 4th as a cause of cancer deaths in Michigan. Education and appropriate screening can detect and remove precursor conditions and prevent development of colorectal cancer. A Breast & Cervical Cancer Screening Program exists and can be expanded into a broader cancer prevention program to address colorectal cancer and reduce gender disparity in cancer services. The Program will provide risk assessments and referral COMMUNITY-BASED PREVENTION STRATEGY: Cancer Education and Screening for screening, diagnosis and treatment for economically-disadvantaged population in Macomb County according to accepted Guidelines. 7/1/2009 Program (Breast, Cervical and Colon)

Submitted Requests - Not Approved

6/1/2011

329 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County

Macomb County

County-wide

County-wide

Project Name

Project Description

Start Date

Expected Completion Date

PUBLIC HEALTH WORKFORCE DEVELOPMENT: Training on Strategies to address Health Disparities

Due to the evolving population, to improve health and promote safe and supportive environments, one strategy must be to reduce racial and ethnic health disparities. Culturally and linguistically appropriate services must be integrated throughout the healthcare organization and be undertaken in partnership with the communities being served, through utilization of external minority health groups for input into policy design, implementation, and evaluation. Adequate training of health care managers and public health workforce must precede this approach. Training must be cultureand gender-appropriate. 7/1/2009

SCHOOL & COMMUNITY-BASED PREVENTION STRATEGY: Comprehensive Youth Tobacco Prevention Program

Tobacco use accounts for 1 in 10 adult deaths and kills roughly half of all persons who use it – whether directly or indirectly. Secondhand smoke is the 3rd leading preventable cause of death. More women (26.7%) are current smokers than males (21.8%) (2005 Macomb County BRFS). Women’s rate of smoking has not changed much over the last decade (28.0% to 26.7%), while men’s smoking rate has decreased from 32.6% in 1999 to 21.8% in 2005. The highest proportion of smokers is found in the 25-34 year age group. The 3 main overarching goals for the Comprehensive Tobacco Prevention Program are to 1) protect the public from the effects of environmental tobacco smoke, 2) prevent young people from taking up smoking tobacco, and 3) promote/encourage tobacco smoking cessation by users who want to quit. The proposed Project will focus on prevention of smoking intiation among youth in schools and community through health education and promotion. 6/1/2009

T O

O R 12/1/2009

Funding Request

D VE

P P A

-N

6/1/2011

$

20,000

At Census 2000, Macomb ranked 3rd among Michigan counties by percentage of population who are foreign-born (8.76%). In 2006, racial minorities accounted for 10.3% of the population - increasing from 3.1% in 1990. Factors contributing to disparities in health include: poverty, educational level, cultural attitudes/norms/values language, and mistrust of the health-care system by minorities. Health disparities are seen in adult immunization, cardiovascular care, cancer care, diabetes, HIV/AIDS and infant mortality. The Macomb County Health Department's Community Health Outreach Program (CHOP) presently provides health information and outreach services to people residing in Mt. Clemens and Clinton Township. The expanded program will engage the increasing minority population groups (e.g. asian, arabic) by providing appropriate outreach and language services to prevent health problems, promote health and protect the population. This involves the increased use of community health advocates. 7/1/2009

6/1/2011

$

100,000

INFECTIOUS DISEASES: Hepatitis Prevention & Control Program

Chronic hepatitis C disease in 2008 ranked third among reported communicable disease in Macomb County (behind flu-like disease and gonorrhea). This represented a 30% increase over numbers reported in 2007. Chronic hepatitis B disease ranked 6th in 2007 & 2008. The new Hepatitis Prevention & Control Program will provide counseling, testing and referral for clients, and provide vaccination for Hepatitis A & B.7/1/2009

9/1/2011

$

180,000

SCHOOL-BASED PREVENTION & WELLNESS STRATEGY: Expansion of Healthy Kids Healthy Hearts Program

Increasing prevalence of childhood obesity is a leading risk factor for later development of chronic diseases (e.g. heart disease, diabetes). Healthy Kids-Healthy Hearts Program is designed to teach healthy habits (physical activity and proper diet) to 4th Grade students in Macomb County. In 2008-2009, there is participation in the program by 10 schools, but we project to expand the Healthy Kids-Healthy Hearts program to 20 schools by school year 2010/2011. Benefits include reduced levels of childhood obesity; reduced incidence of chronic diseases; and reduced health care costs in the long-term. 4/1/2009

6/1/2011

s t s

Route (Infrastructure Only)

e u

Macomb County

Macomb County

County-wide

d e tt

ADDRESSING HEALTH DISPARITIES: Expansion of Community Health Outreach Program for under-served Populations

it

m b u

County-wide

S Macomb County

County-wide

02262009

q e R

Submitted Requests - Not Approved

330 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County

Macomb County

Macomb County

Macomb County

County-wide

County-wide

Gratiot Avenue

Project Name

Project Description

Expected Completion Date

Start Date

INFECTIOUS DISEASES: Expansion of the Sexually Transmitted Disease Prevention & Control Program

Increasing levels of sexually transmitted diseases, affecting mainly the 19-24 year age group, emphasizes the need for expanded STD/HIV services. The need for enhanced clinical services and Partner Counseling and Referral (PCRS) services must be addressed to effect reduced incidence of STDs and HIV infection. 4/1/2009

INFECTIOUS DISEASES: Expanded Tuberculosis (TB) Prevention & Control Program

The priorities of the Macomb County TB Control Program are 1) identification and treatment of all persons who have Tuberculosis (active TB disease), 2) contact Investigation - finding and evaluating persons who have had contact with TB cases and 3) screening of persons at high risk for tuberculosis - to identify and treat latent TB infection (LTBI). The expanded program will increase the focus on expanding contact investigation and screening for LTBI with the overall aim of reducing the incidence of active TB cases.

Ride SMARTer

Utilizing the Alternative Buses and Trucks allocation provide the Suburban Mobility Authority for Regional Transportation (SMART) with the resources to purchase an alternative fuel bus for the Gratiot Avenue Route in Macomb County. The Gratiot route has the highest ridership for SMART.

T O

9/1/2011

O R

P P A 4/1/2009

Health Department Dental Clinic. Dental Outreach Days

Dental Outreach Days for Special Needs populations ie Cultural (Hispanic) programatic (Headstart) Special needs clinics would be held on non traditional days of the week or routine work hours to encourage and fascilitate Dental services to theses populations. 7/1/2009

Macomb County

Green Macomb

In conjunction with Macomb Community College and Michigan State University Extension the Macomb County Department of Planning and Economic Development will seek to establish a training and career development program that will provide workers with opportunities to get involved in careers in the energy efficiency and renewable energy industries. The effort will be founded on the Macomb County Targeted Industries Report and relationships already established with company's working alongside the Macomb County Department of Planning and Economic Development. The training and workforce development will also incorporate curriculum for developers to learn Low Impact Development (LID) and green building techniques to re-tool how developers work (For the LID/Green Building training we can utilize the newly published SEMCOG LID Development Manual).

Macomb County

The Macomb County Department of Planning and Economic Development alongside Transmitting Change: Macomb County Smart ITC Transmission will seek to develop the infrastructure and intergovernmental Fall 2009/Winter Grid Pilot Project agreements to develop a grid connection for a commercial grade wind turbine. 2010

N s

Funding Request

D VE

9/1/2011

$

200,000

$

250,000

Route (Infrastructure Only)

Gratiot Avenue SMART Route

12/30/2010

$

70,000 N/A

t s e

Macomb County

Macomb County

u q e

R d

e t tt

i m

Macomb County

Macomb County

ub

S

Macomb County

Macomb County

02262009

In partnership with the Macomb Community College Department of Continuing and Professional Education the Macomb County Department of Planning and Economic Development alongside the Macomb County Department of Senior Citizen Services will develop a volunteer program for senior citizens to perform community service work. The initiative will focus on community service work not only with seniors Macomb County Senior Community Outreach assisting other seniors, but also with seniors engaging in activities with school aged Network children to spur the whole "multi-generational" communities concept".

Macomb County Lidar Aerial Photo

Utilizing Watershed and Flood Prevention allocation perform a Countywide LIDAR Aerial Photo flight in order to establish accurate elevations for the purpose of evaluating watersheds and floodplains, developing flood mitigation programs, and emergency management practices.

Submitted Requests - Not Approved

Ongoing once startup funds established

Summer/Fall 2009

Ongoing dependant on funding

Summer/Fall 2009

Fall 2009

331 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

This project encompasses retro-fitting Lighting fixtures in two buildings currently running in Macomb County. With this project, we feel that it meets all criteria set forth in this Stimulus Package. It will create an immediate infusion of work,Revenue, & Tax Revenue for a number of Local Michigan companies, as the Vendor is from Grosse Pointe, the Manufacturing Facility is in Romeo, MI., and they would be utilizing local Trades to perform the installation. Macomb County would benefit from the energy savings that would be realized for years to come, along with the potential savings of tax dollars for current, and future budgets. In conclusion this project could also generate a potential energy savings of 50%, which attains the objective of reducing environmental impact on the energy side. 60 Days

Macomb County

Macomb County

Lighting Reto-Fit

Macomb County

Macomb County

Macomb County Health Profile & Assessment Develop county health profile and assessment

Macomb County

Macomb County Building, 10 N. Main St., Mt. Clemens, MI 48043 and Macomb County Court Building, 40 N. Main St., Mt. Clemens, MI 48043 Elevator Replacement Program

Macomb County

Macomb County Jail, 43565 Elizabeth, Mt. Clemens, MI 48043, Central Receiving, 21930 Dunham, Mt. Clemens, MI 48043, Southeast Health Center, 25401 Harper, St. Clair Shores, MI 48081 and Macomb County Health Department, 43525 Elizabeth, Mt. Clemens, MI 480 Masonry Restoration Project

Macomb County

Macomb County

Macomb County

Macomb County

02262009

T O

D VE

2/1/2010

$

$

Route (Infrastructure Only)

124,754 35,000 N/A

1,000,000

N s

t s e

u q e

In order to preserve the exterior of various County facilities, masonry tuckpointing is required. The County would focus on the Macomb County Jail, Central Receiving, Southeast and Health Center. Project to include tuckpointing, stone cap replacements, cutting in expansion joints.

R d

Mount Clemens Sugar Beet Factory

ub

S

Mt Clemens

t i m

180 Days

Funding Request

Commence the bid process within Replace two passenger elevators in the Macomb County Building and four passenger 60 days after elevators in the Macomb County Court Building. Elevators were installed in the early receipt of 12 months after to late 1970s. Minor upgrades have been made throughout the years. Elevators are approval of commencement of unreliable. funding construction $

e t t

Mount Clemens

O R

P P A 8/5/2009

Macomb Township Card Road former landfill site Superfund site clean up

Macomb Township

Mount Clemens

Start Date

Expected Completion Date

Brownfield evalutaion and clean up for former Sugar Beet Factory site

Commence the bid process within 120 days after receipt of 12 months after approval of commencement of funding construction $

Fall 2009

Dependant on further environmental testing

Fall 2009

Dependant on further environmental testing

Prenatal Care Healthy Kid MiChild Advocate

Paraprofessional to assist low income Women and families who are pregnant or have children and are uninsured or underinsured;help clients understand what program they may be eligible for; advocate for the client with DHS when there are extenuating health concerns or eligibility problems and link them to approriate services. 7/1/2009

12/30/2010

Jeep (Juvenile Employment Enrichment Program)

#2: Juvenile Employment Education Program (JEEP): Youth at the Juvenile Justice Center take vocational training to learn entry level job skills, take work readiness workshops for job hunting skills, and perform career exploration and interest inventory testing to establish their career pathways. Youth will earn certificates from the local community college, elective credits toward graduation, and finish with a portfolio of credentials and a basic resume. 5/1/2009

Ongoing

Submitted Requests - Not Approved

$

1,500,000

50,000 N/A

332 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County

Macomb County

Macomb County

Macomb County

Macomb County

Macomb County

Macomb County

Project Name

Start Date

Complete renovation of a 1931 13-story Macomb County office building. 104,000 sq. ft. Renovation to include mechanical upgrades to reduce water, electric and natural gas use. Make a healthy building by using more fresh air for indoor air quality, and saving energy by using outdoor temps for free cooling and heating. Electrical upgrades to include energy efficient light fixtures, motion sensors for lights, sensors for faucets and toilets, water restrictors on water closets. Renovations to also address life safety issues, fire suppression, and evacuation. Projects have been designed only requiring minor revisions.

Funding Request

Mt. Clemens

County Building Renovation

9,000,000

Mt. Clemens

Commence the bid process within 90 days after Renovate and remove package water cooled units and tie into existing chilled water receipt of 10 months after County Building 1st Floor Cooling System and system. These units will bring in fresh air for indoor air quality. This will save on wate approval of commencement of IT Cooling System and sewage costs. funding construction $

300,000

Mt. Clemens

Probate Court Lobby Expansion

Expand lobby to accommodate security system and public overflow. Currently, the public is required to stand outside due to the limited lobby space within the current facility.

Commence the bid process within 30 days after receipt of 2 months after approval of commencement of funding construction $

60,000

Court Building HVAC System

Commence the bid process within 120 days after Built in 1967, cooling and heating (steam) coils need to be replaced. Blowers, motors receipt of 90 days after and drives need to be updraded to be more efficient and reduce the load on the approval of commencement of chillers, cooling tower and boilers. funding construction $

250,000

1st Floor Court Building Renovation

Commence the Renovate the 1st Floor of the Court Building to accommodate the Jury Commission bid process within and renovate the Clerk's Office area to accommodate Court files and related Clerk's 120 days after Office functions. Relocating the Jury Commission from its current location would allowreceipt of for additional court rooms for future growth. Renovation would contain energy-efficien approval of lighting, motion sensors, etc. funding

Mt. Clemens

Mt. Clemens

d e tt

Installation of Lift Station at the Macomb County Jail

Mt. Clemens

t i m

ub

Mt. Clemens

Mt. Clemens

02262009

T O

O R

P P A

N s

e u

st

12 to 18 months after commencement of construction $

2,000,000

Commence the bid process within 90 days after receipt of 8 months after Emergency overflow sewer system. Safely diverts raw sewage from Macomb County approval of commencement of Jail in care of breakdown of forced sanitary main or pumps. funding construction $

55,000

q e R

Commence the bid process within 90 days after receipt of 6 months after approval of commencement of funding construction

Jail Domestic Hot Water System Tank Replacement

The hot water system is old and inefficient and in constant need of repair. New equipment would be energy efficient and reduce cost.

CONSERVACAPS

This project encompasses installing Conservacaps & Sloan Replacement Kits, on the toilets at the Macomb County Jail, which would provide a substantial savings in Water & Sewer payments currently incurred and reducing the amount of water currently used. The project could be implemented very quickly, and would provide a long term savings to Macomb County in that the $29,000.00 savings could be realized every year. 60 Days

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

Commence the bid process within 90 days after receipt of 2 years after approval of commencement of funding construction $

S Macomb County

Project Description

Expected Completion Date

180 Days

$

27,000

333 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County

New Haven

Project Name

Project Description

New Haven Foundry

Start Date

Brownfield evalutaion and clean up for former New Haven Foundry site

Shelby Township Superfund Site 23 Mile Road between Dequindre and Ryan Superfund site clean up

Fall 2009

Dependant on further environmental testing

Fall 2009

Dependant on further environmental testing

Macomb County

Shelby Township

Macomb County

Three Health Department offices. Well Child Clinic

Under the guidance of a Family Health or Pediatric Health Practioner provide a clnic setting for assessing infants and childrens Health,Growth and Developemnt, Nutritional, Immunization and Lead status.

Macomb County

To be identified

School Dental Program

Provide Dental assessment,cleaning and Fluoride Varnish applicaton through a collaborative effort between the Department's Dental program and identified school(s).7/1/2009

Macomb County

Warren, Center Line, Sterling Heights, Utica, Shelby Township, Washington Township, Romeo, and Bruce Township

Van Dyke (M-53) Access Management

Utilizing Federal Highway Administration funds to perform an Access Management Study for Van Dyke from 8 Mile Road in Warren to 33 Mile Road in Bruce Township. The County would work alongisde SEMCOG and MDOT and institute the same projec structure that it instituted to develop the Gratiot Access Management Study.

Macomb County Macomb County

Macomb County Health Department

Macomb County Health Department

Macomb County Health Department

Macomb County Health Department

PP

Utilizing Federal Highway Administration funds to perform an Access Management Study for Groesbeck from 8 Mile Road in Warren to Hall Road in Macomb Township. The County would work alongisde SEMCOG and MDOT and institute the same projec structure that it instituted to develop the Gratiot Access Management Study.

12 Northern Municipalities Illicit Discharge Elimination Program

The Macomb County Health Department will identify and eliminate sources of pollution which negatively impact the water quality of the storm water infrastructure throughout Macomb County. Resulting beach closings and generally poor water quality has far reaching economic impacts. An increased level of field staff will be necessary and additional support staff may also be necessary. 5/1/2009

Clinton Township and Sterling Heights

02262009

$

20,000 N/A

Van Dyke

Groesbeck

u q e

331,000

Macomb County Health Department will establish investigative teams to conduct dye tests within every commercial, industrial & institutional facility in Clinton Township & Sterling Heights to ensure proper infrastructure connections. The additional staff will identify and eliminate illegal connections within these buildings which have contributed to environmental pollutants. 5/1/2009

5/1/2011

$

384,000

Electronic Waste Collection

The Macomb County Health Department proposes an electronic waste collection/reclamation in response to the ongoing accumulation of computer-related wastes and upcoming television digital transition. Additional staffing at the collection point and reclamation point will be necessary to effectively divert these wastes from local landfills and arrange environmentally responsible reclamation.

5/1/2009

5/1/2011

$

50,000

Clinton River Expanded Monitoring Program

The Macomb County Health Department proposes to install automated sampling devices at significant, predetermined locations throughout the Clinton River watershed to gather 24/7 water quality data. This data will offer insight into the sources of pollution during rain events, after hours & holidays/weekends. Additional field staff, data compilation staff and analytical staff will be necessary. 5/1/2009

5/1/2011

$

63,000

m b u

R d

e t t

Facility Dye Testing Program

Submitted Requests - Not Approved

Route (Infrastructure Only)

N/A

$

S County-wide

12/30/2010

D VE

5/1/2011

it

County-wide

12/30/2010

Funding Request

O N

Warren, Roseville, Fraser, Clinton Township, Mount Clemens, and Macomb Township Groesbeck (M-97) Access Management

t s e

O R

7/1/2009

A T

s

Expected Completion Date

334 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb County Health Department

Macomb County Health Department

Macomb County Health Department

Project Name

Project Description

Start Date

Macomb County and St. The Effects of Nutrients on Lake St. Clair's Clair County (county-wide) Ecosystem

The Macomb County Health Department will develop and implement a sampling regimen at 5 strategic locations throughout the Clinton River watershed to determine the cause and effect of nutrients on the Lake St. Clair ecosystem. Additional staff will be necessary to increase our understanding on how phosphorous and chlorides affec the overall water quality in Macomb County. 5/1/2009

Macomb County Lake Shoreline

The Macomb County Health Department proposes to conduct E. coli sampling activities three times a week at 30 major infrastructure outfalls throughout the County. The collected data will be gathered, analyzed and interpreted to determine the relationship between the County's storm sewer infrastructure and the affect(s) on nearby bathing beaches. Staffing resources will be increased to accommodate the additional work load. 5/1/2009

Lake St. Clair Shoreline Water Quality Monitoring

Macomb County, St. Clair County (county-wide) and City of Detroit Drinking Water Monitoring Project

N s

The Macomb County Health Department intends to partner with the City of Sterling Heights to offer its 127,000+ residents a convenient & environmentally superior alternative to land filling their household hazardous waste. Hiring interns/summer students will be necessary at the collection level and additional part-time/full-time staff may be necessary at the reclamation level. 5/1/2009

D VE

63,000

5/1/2010

$

40,000

5/1/2011

$

2,000,000

9/30/2010

$

52,000

Sterling Heights

Macomb Michigan State University Extension

Clinton Township Office / Countywide Impact Digital Media Specialist

Expand educational programs in the areas of financial literacy, housing assistance, Two months after nutrition information, green living, energy conservation and food production through release of federal After end of federal digital media. Technical expertise is needed adapt service delivery in the digital age. money. funding.

Macomb Michigan State University Extension

Clinton Township Office / Foreclosure Prevention Information and Countywide Impact Referral Service

MSUE has a foreclosure and counseling program that is partially funded. Additional revenue is needed to provide triage, initial screening, scheduling of counseling, and referrals to community resources.

d e tt

Clinton Township

ub

t i m

Kitchen Incubator

t s e

qu

e R

Funding Request

$

O R

P P A

Macomb County has partnered with neighboring counties to conduct continuous, automated, real-time water quality monitoring in response to historic chemical spills/releases from industries which impact drinking water supplies. Staffing will be necessary to operate equipment, collect, analyze, interpret and disseminate data. Stakeholders will receive results to identify responsible parties and undertake actions to protect drinking water supplies. 5/1/2009

T O

5/1/2011

Macomb County Health Department

Macomb Michigan State Universtiy Extension

Expanded Household Hazardous Waste Satellite Collection

Expected Completion Date

Route (Infrastructure Only)

Two months after release of federal After end of federal money. funding.

A kitchen incubator is a business incubator dedicated to the food business, especially catering, retail and wholesale businesses. They allow individuals who aspire to own and operate their own food related business an opportunity to start that business with minimal capital investment, develop their product and market, then move to their own facility after their concept is proven. There are currently nine food related businesses in Macomb County being counseled through the Michigan State University Product Center, with an additional twenty-eight businesses being counseled in the counties surrounding Macomb County. The closest kitchen incubator to Macomb County is located in Bad Axe, Michigan, some 75 miles away. In addition, a facility in Macomb County would attract entrepreneurs from throughout southeast Michigan. 6/1/2009

6/1/2011

S 02262009

Submitted Requests - Not Approved

335 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb MSU Extension

Project Name

Project Description

Start Date

Lake St. Clair Observing System

Michigan Sea Grant Extension, through Macomb MSU Extension, will help meet NOAA program goals relating to satellites and sensors by developing and implementing the Lake St. Clair Observing System (LSCOS), a needed addition to the Great Lakes Observing System (GLOS). Lake St. Clair is a dominant feature of Macomb County, and is home to the largest concentration of recreational boating in the Great Lakes. It also supports multiple world-class sport fisheries, supplies drinking water to coastal communities, and is vital to regional and international shipping. The LSCOS will be developed in collaboration with the Marine Hydrodynamics Laboratories (MHL) of the University of Michigan, and will feature a series of three environmental monitoring buoys on Lake St. Clair. Michigan Sea Gran Extension has been integral in developing the GLOS, and has a successful record of working in partnership with the UM MHL. Our goal for this project is to make Lake St. Clair data readily available to all those who would use it to improve coastal and marine safety, aid in predictions of climate change, manage resources for sustainable use, pr 6/1/2009

Macomb County

Energy Education for Homeowners

Develop and implement energy education training programs for county residents to improve energy efficiency and savings. These programs will educate and promote both action and equipment to reduce energy use. Programs will cover current energy use, how to determine energy use, conservation practices, energy conserving and ENERGY STAR products. These programs will include hands on activities. Possibly partner with local retailers that carry ENERGY STAR products to host programs to expand outreach. Target audiences will be the general public and low-income residents currently in MSUE programs. Program will use group program events, in home educational sessions and web based information through MSUE county and MSU websites. Participant incentives will be offered to promote changes in current practices and /or equipment updates. Products produced through this program will include updated energy curriculum and presentation media, informational brochures, materials, fact sheets web information and media pieces. There is potential to expand this program to include small businesses. May, 2009

Macomb Township

Construction of up to approximately 20 Miles of sidewalk/pathway to complete Pedestrian Sidewalk/Pathway Connnection linkages in an effort to achieve a contiunous pedestrian pathway system along the Program (three phases each of the next three major arterial roadways of the Township. An annual maintenance program will also be years) established for the existing and expanded pathway system. 3/1/2009

Clinton Township

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

5/30/2011

$

324,000

September, 2010

$

100,000

9/30/2010

$

10,000,000

N s

Macomb MSU Extension

Macomb Township

Macomb Township

Macomb Township

Macomb Township

Macomb Township

d e t

qu

e R

Pump Station #9 Replacement (21 Mile Rd East of Romeo Plank) Fire Station No. 1 and Sheriff's Substation Replacement

Replacement of an existing sanitary sewage pump station with a new pump station. Additional sewage flow from recent growth in the community are approaching the ultimate capacity of the pump station. A larger pump station must be constructed to handle the ultimate flow from the service area. 3/1/2009 Construction of new fire station and sheriff's substation on the site of the old facilities along with associated site improvements. 3/1/2009

9/30/2010

$

4,000,000

9/30/2010

$

10,000,000

Buckingham Village Detention Pond Rehabilitation

Repair storm water pump station, stabilize side slopes of detention pond and restore pond site to original condition. Due to an unstable soil condition, the pond is no longer functioning as designed causing potential flooding concerns. 3/1/2009

7/1/2010

$

200,000

Construction of additional athletic facilities including: 3 ball diamonds, 3 U10 and U8 soccer fields, 2 volleyball courts, walking paths and associated facilities.

2/1/2009

11/1/2009

$

4,000,000

3/1/2009

9/30/2010

$

1,100,000

itt

m b u

S

t s e

Macomb Township

Macomb Township

Macomb Township

Macomb Township

Macomb Corners Park Phase II

Macomb Township

Replacement of old 6" water main through the older residential areas of the Urban, Shepherd, North Branch, Deneweth, & community with a new 8" water main. Due to the age of the existing water main, breaks are beginning to occur which is affecting system reliability. Patnick Water Main Replacement

Macomb Township

02262009

Submitted Requests - Not Approved

336 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Macomb Township

Replacement of a 30 year old sanitary sewage pump station with a new pump station. Pump Station #2 Replacement (21 Mile Rd & Due to the age and excessive use of the existing pump station, the existing equipment North Ave.) has begun to deteriorate which is affecting system reliability. 9/1/2008

7/1/2010

Macomb Township

Macomb Corners Park Phase II Sanitary Sewer Extension (Between Card Road and Luchtman Road)

7/1/2009

Macomb Township

Macomb Township

Relocation and Replacement of an old 12" asbestos-cement transmission water main under the roadway with a new 16" transmission water main outside the roadway. The Romeo Plank Road Water Main Replacement new main will provide for better pressures and reliability for residents and business (S. of 21 Mile Road to 22 Mile Road) owners. Jan. 1,2007

Macomb Township

Macomb Township

New Haven Schools Trunkline Sanitary Sewer Construction of a new trunkline sanitary sewer to provide service to the new school Extension (25 Mile Road to 26 Mile Road) complex for New Haven School District in Ray Township.

Macomb Township

Macomb Township

Macomb Township

Macomb Township

Macomb Township

Construction of a new trunkline sanitary sewer to provide service to the second phase of Macomb Corners Park. 1/1/2008

2,700,000

$

300,000

$

2,000,000

D VE

11/1/2009

$

2,500,000

Macomb Township

22 Mile Road Water Main (1/2 East of North Ave to Fairchild Road)

9/1/2010

$

385,000

Macomb Township

Relocation and Replacement of an old 12" asbestos-cement transmission water main under the roadway with approximately 5,400 LF of a new 16" transmission water main Romeo Plank Road Water Main Replacement outside the roadway. The new main will provide for better pressures and reliability for (22 Mile to 23 Mile Road) residents and business owners. 3/1/2009

7/1/2010

$

1,300,000

Macomb Township

Replacement of an existing undersized trunkline sanitary sewer with a larger diameter sanitary sewer. Additional sewage flow from recent growth in the community are approaching the ultimate capacity of the trunkline sanitary sewer. A larger trunkline sanitary sewer must be constructed to handle the ultimate flow from the service area. 3/1/2009

6/30/2011

$

10,400,000

23 Mile Rd Sanitary Sewer Replacement (PS#7 East to McBride PS)

d e tt

Livonia, Metropolitan Detroit, northern Michigan Michigan and the Journey to Freedom: (Gaylord area) Mobilizing a Young Actor/Humanist Corps

it

m b u

1/1/2008

$

Construction of approximately 1,600 LF of a new 16" water main, which will complete the water main loop in this area. The new main will provide for better pressures and reliability for residents. 9/1/2009

A T

s

st

e u

Madonna University

PP

O R 6/30/2009

Funding Request

O N

Michigan and the Journey to Freedom is a two-year project that will employ young actors and professional humanists on a part-time basis to work with community groups (especially disadvantaged minority youth) on activities that will teach them about Michigan history and a restore hope in their ability to realize their goals and ambitions. The project will entail a series of related activities that will be made available to communities in metropolitan Detroit and in the northern Michigan vicinity o Gaylord. The project will sponsor (1) a writer-playwright to create a series of short dramatic pieces based on Michigan's role in the "Journey to Freedom"; (2) a part-time theatrical director to produce the plays with young actors, who will take the play to school and community centers; (3) a recently graduated Sign Language interpreter to provide dramatic interpretation for deaf and hard-of-hearing audiences; (4) four young humanities scholars to initiate reading and discussion programs in local libraries or reading groups focused on historical and literary texts related to the themes of the plays; and (5) a festival of the arts, which will bring young visual and musical artists int9/30/2009

q e R

Route (Infrastructure Only)

9/29/2011

S 02262009

Submitted Requests - Not Approved

337 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Madonna University Manistee County Manistique Area Schools Manistique Area Schools Manton Consolidated Schools

Livonia, Metropolitan Detroit, southeastern Michigan

Project Name

Start Date

Preparing Michigan Citizens for Jobs in Film and Video Production will enable Madonna University to complete construction of a state-of-the-art media center/broadcast and cinema arts studio, which is part of a new $20 million science and media building being constructed on the University's main campus in Livonia. The Media Center is a key component of the project and will provide an exceptional environment where students can receive hands-on training in film and video production as well as other advanced technologies. Designed as a stand-alone structure of 15,000 square feet within the larger science and media building, the Media Center will provide facilities for preparing unemployed workers for entry-level jobs in a broad range of positions: production assistant (15-week certificate program); directors, producers, editors, digital cinematographers, production managers, writers, script supervisors, colorists, anchors, reporters, on camera talent, camera operators, Preparing Michigan Citizens for Jobs in Film production assistants, web designers, teachers, and managers (four-year bachelor's degree program). The Center will house facilities for the advanced digital technologies9/30/2009 and Video Production Bear Lake Bear Lake 2009

Manistique, Michigan

Middle/High School Roof

Manistique, Michigan

Middle/High School Direct Digital Control

Manton

Project Description

T O

-N

Light and switch retrofitting

Light and switch retrofitting

Maple Grove Township Maple Grove Twp

Pave Senior Citizen Center parking lot

Pave parking lot at Senior Citizen center. Existing lot is in poor shape with many cracks and patches which create trip hazards for seniors using the center. Center is open 5 days a week with activities and meals for seniors in the area.

Maple Grove Township Maple Grove Twp

Replace bridge, 14000 mile Bishop rd

Maple Grove Township Maple Grove Twp

South Bueche Rd

Maple Grove Township Maple Grove Twp

Upgrade Township Park

Maple Grove Township Maple Grove Twp

North Bueche Rd

Maple Grove Township Maple Grove Twp

d e tt

Mar Lee School District

t i m

Eliminate flooding on bueche road Upgrade Network system to accommodate AR

e u

Replace bridge over Albert drain Prep south Bueche rd including setting back ditches, tree removal, scarify existing road, prep road bed, fill as required, mpave

q e R

O R

P P A

Replace 33-year-old roof with a more energy-efficient roofing system. Replace our pneumatic control system with DDC controls. Other upgrade to HVAC system.

s t s

Expected Completion Date

Funding Request

D VE

12/29/2009 2010

$ $

7/1/2009

9/1/2009

$

500,000

20,000,000 1,000 Yes

5/1/2009

9/1/2009

$

800,000

Two months after funds are appropriated One month

$

61,400

7/1/2009

8/1/2009

$

60,000

8/1/2009

10/1/2009

$

150,000

7/1/2009

10/1/2009

$

225,000

7/1/2009

$

60,000

6/1/2009

$

125,000

$

200,000

Create storage area at Twp park for activities equipment 6/1/2009 Pave north Bueche rd. Road has been prepared but Township is unable to complete due to lack of funds 5/1/2009 Currently a 1/4 mile section of bueche rd @ Volkmer rd floods several times each year during times of high water, blocking (6) residences from access in or out of the property. There is no way for emergency vehicles to get to their homes during the high water. 9/1/2009 2. Upgrade Network system to accommodate AR

6/1/2009

9/30/2009

$

8,000

Purchase mobile wireless computer lab

3. Purchase mobile wireless computer lab

7/1/2009

10/30/2009

$

24,000

Upgrade new phone/intercom system

1. Upgrade new phone/intercom system

6/1/2009

9/30/2009

$

22,000

Install small greenhouse for science program 4. Install small greenhouse for science program

6/1/2009

9/30/2009

$

3,000

Purchase new playground equipment

5. Purchase new playground equipment

6/1/2009

9/30/2009

$

3,000

Marion Public Schools Marion

Renovate Elementary Cafeteria

Renovate Elementary Cafeteria

5/1/2009

8/25/2009

$

120,000

Marion Public Schools Marion

Create New CAD classroom/workstation

Create New CAD classroom/workstation

5/1/2009

8/25/2009

$

5,000

ub

Mar Lee School District Mar Lee School District Marengo Twp. Mar Lee School District Mar Lee School District

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

338 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Marion Public Schools Marion

Project Name Replace water heater and renovate boiler room

Replace water heater and renovate boiler room

5/1/2009

6/1/2009

$

20,000

Marion Public Schools Marion

Replace doors and Hardware interior Doors

Replace doors and Hardware interior Doors

6/1/2009

8/25/2009

$

100,000

Technology Smart Building

Renovation of building to house technology training programs. Programs will be provided by Northern Michigan University and local businesses and potentially Michigan Tech and MTEC Smart Zone.

6/1/2009

9/1/2009

$

5,800,000

Water System

Modeling study identified several locations where there is inadequate water pressure for fire protection at or adjacent to the K.I. Sawyer Airport. Approximately 11,000 LF of water main will be replaced with larger diameter pipe. 5/1/2010

$

1,300,000

6/1/2009

$

1,656,000

10/1/2009

$

2,090,000

Marquette County

Marquette County

KI Sawyer

KI Sawyer

Project Description

Start Date

Expected Completion Date

P P A

O R 11/1/2010

Funding Request

D VE

Marquette County

Chocolay Township

Community Corrections Detention Center

Marquette County

Powell Township

Big Bay Harbor Environ-mental Restoration

The Marquette County Community Corrections Detention Center will increase jail bed capacity. As Governor Granholm and the legislature consider changes to Michigan's corrections system, county jails must be positioned to absorb community-level impacts. The project will renovate a vacant state facility for use by Marquette County. 4/1/2009 Restoration of breakwall to reduce silting. Erosion control and shoreline stabilization work. 6/1/2009

History on the Move

Marquette County History Museum is requesting up to $125,000 in federal economic recovery funds, for renovation of a new museum facility. Founded in 1918, MCHM is the oldest museum in Michigan’s Upper Peninsula. Increased demand for services, an inadequate, deteriorating infrastructure and demands of new technology place a serious strain on our ability to serve the public. The Museum purchased, a former bus garage, in 2007 and began a $4.7 million capital campaign to finance the project. Over two years of planning, the Museum has developed partnerships with stakeholders. Construction is scheduled to begin in spring 2009. When completed, in summer 2010, the renovation will be a model for green re-use of buildings. The stateof-the-art facility offers four times the current exhibit space, cutting edge technological interactives, travelling exhibit gallery, climate-controlled storage, expanded research library, educational “classroom”, public gathering space, on-site parking and universal access. The community has supported the project with $1.6 million in donations from individuals, corporations and foundations over 18 months. We also received a prestigi 5/1/2009

6/1/2010

$

4,750,000

Deploy HIT architecure to support electronic exchange of health information across the Upper Peninsula of Michingan, allowing for seamless transfers between hospitals, clinics, and other relevant agencies. This technology provides all HIPAA required security, and does not require all data elements be replecated in a centralized repository. It also ensures absolute positive patient identification to avoid intermingling of data between patients with similar demographic profiles. 7/1/2009

dependent on funding and scope of project $

1,500,000

Functional Telemedicine

In conjunction with Michigan State University, expand the reach of telemedicine services to leverage the abilities of the phyicians available at our regional referral facility across the Upper Peninsula of Michigan to be able to reach more rural communities, FQHCs, RHCs and other venues where this would be a cost effective and clinicially appropriate service.

7/1/2009

dependent on funding and scope of project $

1,000,000

Ambulatory EMR

Implementation of an ambulatory electronic medical record for the Superior Care Partners which provide care across the Upper Peninsula of Michigan. This wil allow better coordinated care, and the ability to leverage scare medical resources across rural communuities.

12/1/2009

12/1/2010

1,000,000

T O

Route (Infrastructure Only)

N s

t s e

Marquette County History Museum

Marquette General Health System

Marquette General Health System

Marquette General Health System

Marquette

Marquette

02262009

R d

e t t

it

Marquette

Marquette

u q e

Secure HIT Information Exchange

u S

bm

Submitted Requests - Not Approved

$

339 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Upper Penisular Center for Human Marquette City, Marquette Preformance Enhancement, Reseach and Township Wellness Marquette Charter Township Township Facilities Marquette Charter Township Township Facilities

An innovative public/private partnership between Marquette General Health Systems and Northern Michigan University to build a premiere regional center for sports medicine and sports science. The new facility will integrate physical, educational and human resources from both institutions. The Center will allow faculty and staff to use their experience, proximity and shared goals to inspire creative and innovative efficiencies, methods and solutions. Benefits will include: · Centralization of programs and services for management and delivery of injury and disease prevention, education, rehabilitation and fitness; · Health and fitness management services and educational and athletic opportunities that will support regional economic development; · New and expanded programs, curricula and training that support experiential education, academic service learning and clinical education through community outreach and participation; · Reduced health care costs through effective, efficient, accessible and centralized health and wellness services. · A comprehensive center for research into the science of human motion, injury epidemiology and exercis Construct drinking water wells, transmission mains, storage facilities, and pumping facilities to serve residents on threatened private water supplies. June, 2009 Construct Energy Efficient Combined Township Hall, Community/Evacuation Center, Public Safety Center. May, 2009

Marquette Charter Township Marquette Charter Township

Township Facilities

Construct water reservoir and pump station to supply volunteer/paid on-call Fire Department wild fire suppression operations in remote northern portion of the township. Need results from residential growth; and Michigan DNR fire service inability to effectively respond due to distance and reduced resources. Construct new road access for community evacuation center; and access for emergency responders.

Martin Public Schools Martin, Michigan

locker rooms

construct 2 additional locker rooms

Martin Public Schools Martin, Michigan

HVAC

Martin Public Schools Martin, Michigan

walkways

Martin Public Schools Martin, Michigan

building security

Martin Public Schools Martin, Michigan

emergency service

Marquette General Hospital Marquette Township Marquette Township

Marquette Township Marquette Township

Township Facilities

Expected Completion Date

P P A

O R

Funding Request

D VE

2/11/2009

$

June, 2011

$

6,500,000 NA

May, 2010

$

6,800,000 NA

immediate

45 - 90 days

$

150,000 NA

April, 2009

Dec., 2009

$

1,500,000 NA

6.1.09

8.31.10

$

1,600,000

replace HVAC in shop,Gyms, cafeteria

6.1.09

8.1.09

$

250,000

remove & replace selected concrete walkways

6.1.09

8.1.09

$

13,000

video surveillance system upgrade & expansion

6.1.09

8.1.09

$

25,000

install emergency lighting and signage

4.1.09

T O

eq

N s

st

e u

R d

10,000,000

6.1.09

$

10,000

Mason County

Mason County/Amber Township Wastewater A Project to provide gravity sewer on the south side of US 10 from Quarterline Road Amber Township, Mason System Improvements - Quarterline Road flowing west to the existing main at Lange Auto Body shop to accommodate request County, Michigan Extension for service. 7/1/2009

11/1/2009

$

107,000

Mason County

A Project to provide gravity sewer on the south side of US 10 from the Cemetery east Amber Township, Mason Mason County/Amber Township Wastewater and crossing US 10 to the existing main at the Scottville City limits to accommodate County, Michigan System Improvements - Cemetery Extension request for service. 7/1/2009

11/1/2009

$

316,000

Mason County

Mason County/Amber Township Wastewater Amber Township, Mason System Improvements - Northside of US 10 A Project to provide gravity sewer from Lift Station #3 to the end of the existing gravity main to accommodate request for service. 7/1/2009 County, Michigan Extension

11/1/2009

$

330,000

Mason County

Mason County/Amber Township Wastewater A Project to provide gravity sewer on the south side of US 10 from Quarterline Road Amber Township, Mason System Improvements - Gordon Road flowing east and crossing US 10 to the existing main at Gordon Road to County, Michigan Extension accommodate request for service. 7/1/2009

11/1/2009

$

423,000

Mason County

Mason County/Amber Township Wastewater A Project to install a new lift station on the Northside of US 10 and gravity and forcemain sewer lines to increase the capacity of the Mason County/Amber Township Amber Township, Mason System Improvements - Meyers Road Trunkline and Lift Station Wastewater System to accommodate increased demand for capacity. 7/1/2009 County, Michigan

11/1/2009

$

949,000

e t tt

i m

ub

S

02262009

Route (Infrastructure Only)

Submitted Requests - Not Approved

340 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

The Project entails increasing funds for the current Mason County Home Improvemen Program which currently receives $175,000 every two years from MSHDA. This level of funding does not meet the current demand that has increased during the difficult economic times that the State of Michigan has been experiencing over the past few years. A grant of $200,000 for weatherization, new insulation, energy efficient windows and furnaces for low to modest income families would meet the demand for the next 12 months. This program would have a greening effect and have a long term return on investment by reducing the energy costs for our familes who are most at risk during this economic crisis. We would also request $50,000 for the removal of leadbased paint hazards that we will encounter during these projects. 5/1/2009

Mason County

Mason County, Michigan Mason County Home Improvement Program

Mason County

The scope of the project provides for the engineering and deployment of dark fiber optic cable from a central point in Mason County to all households and businesses in Mason County, construction to be accomplished in two phases. Phase I includes the outlying townships of Hamlin, Amber, Custer, Sherman, Free Soil, Grant, Victory, and Eden; the tier-one digital divide townships in the county. Phase II includes the remote tier-two townships of Branch, Sheridan, Logan, and Meade as well as the provision for connecting households in the Cities of Ludington & Scottville, and Pere Marquette Charter Township into the Municipal FTHP project. The citizens of Mason County will own the dark fiber which will be regulated by the Mason County Fiber Authority. The MCFA will contract with a private company to equip, light, and maintain the electronics housed in the central fiber office and outlying powered Ethernet switch locations. The MCFA will also contract with several service providers who wish to connect to the Mason County Municipal Fiber to the PremisesMunicipal /FTHP network. Individual home owners will contract with competitive service providers for voice, data, and video services. A surcharge will be included in t 5/1/2009 Mason County, Michigan Project

T O

O R

P P A

N s

st

e u

Expected Completion Date

Request to hire a new road patrol deputy under the Cops Hiring Grant Program. Mason County would be responsible for at least 25% in matching funds for 3 years and 100% of local funds in year 4.

Funding Request

D VE

5/1/2010

$

250,000

May 1, 2010 for Phase I and May 1, 2011 for Phase II

$

23,486,000

Mason County

Mason County, Michigan COPS Hiring Grant Program

4/1/2009

6/1/2009

$

68,000

Mason County

A Project to make the 115 year old Mason County Courthouse more energy efficient Mason County Courthouse Energy Efficiency by installing a high efficiency furnace, energy efficient windows and lighting , and new Mason County, Michigan Project insulation thus reducing carbon emissions. 5/1/2009 Mason County Terminal Apron Expansion Project to construct a 9,000 S. Yd. Expansion to the Terminal Apron at the Mason Mason County, Michigan Project County Airport. 5/1/2009

9/1/2009

$

346,000

10/1/2009

$

240,000

10/1/2009

$

600,000

10/1/2009

$

600,000

10/1/2009

$

1,313,000

6/1/2009

$

38,000

6/1/2009

$

68,000

Mason County

Mason County Mason County

d e tt

Mason County Airport Snow Removal Mason County, Michigan Equipment Project

it

q e R

Mason County

Mason County, Michigan Mason County T-Hangar Project Mason County Airport Taxiway Construction Mason County, Michigan Project

Mason County

Mason County, Michigan SSCENT Program Equipment

Mason County

S

m b u

Mason County, Michigan SSCENT Program Operating Costs

02262009

Project to purchase Snow Removal Equipment for the Mason County Airport including a Combination Loader/Blower, Plow Truck with Sand Spreader and a Sand Storage Building. 5/1/2009 Project to construct a 10 Unit T-Hangar with Taxi Lanes to the Airport Apron at the Mason County Airport. 5/1/2009 Project to construct a taxiway to Service Runway 8-26 at the Mason County Airport including land acquisition. 5/1/2009 Request to use additional Byrne Justice Assistance formula funds to purchase a new Tahoe for the SSCENT Officer. 4/1/2009 Request to use additional Byrne Justice Assistance formula funds to increase funding from the current of approximately 12% of an officer to agreed upon 50% of actual costs. 4/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

341 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Mason County

Mason County

Project Name

Project Description

Expected Completion Date

Start Date

Pere Marquette Charter Township and the City of Ludington, Mason County, Creamery Corners Outlet Extension IntraMichigan County Drain

The construction of storage facilities for the Creamery Corners Outlet Extension IntraCounty Drain. This drainage facility is severely overtaxed during major rain events. The inability to store rainwater during major rain events was a contributing factor in the failure of the Madison Avenue crossing structure in the City of Ludington during a recent flooding. This drain also provides stormwater drainage for US 10 (Ludington Avenue), Business US 31, and the new Pere Marquette Charter Township First Street Industrial Park. Providing uninterrupted stormwater drainage to streets and roads that serve as access to and from local businesses is imperative to the continued success of these business. 5/1/2009

Pere Marquette Charter Township and the City of Ludington, Mason County, Michigan Jackson Road Drain

Reconstruction of the Jackson Road Drain system. This aging storm sewer causes major flooding in and near major business facilities. It is the desire of the County to secure funding to make complete and permanent improvements to this drainage facility in order to improve access to and the ability of local industries to withstand future flood events. Providing uninterrupted stormwater drainage to streets and roads that serve as access to and from local businesses is imperative to the continued success of these business. 5/1/2009

Ludington

The Mason County Historical Society and the City of Ludington have an agreement fo planning, creating, and operating a Maritime Museum in the former U.S. Coast Guard Station on the channel entering the beautiful harbor. The vision will create an outstanding, “top-notch” multi-themed Port of Ludington Maritime Museum, adding a wonderful cultural and educational facility to the waterfront area. Plans will feature the preserving and displaying of the 1934 U.S. Coast Guard Station and its history. The history of earlier Life Saving Stations at Ludington and Big Sauble Point and the two Mason County Lighthouses will be highlighted.The schooner, break-bulk, carferry, commercial fishing, and Great Lakes freighter usage of the harbor are natural companion stories. The large boat room in the museum will be professionally developed into the main gallery. Some exhibits will be interactive, allowing the visitor to possibly light up one of our fresnel lens or operate a scaled down version of the channel ferry operated from 1860 to 1900. A rescue experience “in” a Coast Guard 44’ motor lifeboat would be an exciting interactive exhibit. With an elevator added, are 8/9/2009

O R

D VE $

200,000

8/1/2009

$

300,000

8/11/2009

$

2,000,000

The current walk in cooler and freezer are to small to store the amount of supplies needed in a safe and organized manner. Because of the limited sizes food must be ordered 3 times per week. Larger units would allow for 1 order to be placed per week Depends upon thus saving on fuel cost and stocking time. funding

$

30,000

Add overhead sprinkler system to balance of 1966 building which has become a new Depends upon life safety requirement. funding

$

42,000

Additional parking lot

Parking for visitors and staff at Oakview Medical Care Facility is very limited and at times unable to accommodate all vehicles. A twenty bed Alzheimer's unit is currently Depends upon being added which will make additional space even more needed. funding

$

46,000

Replace roof for 1966 building

Roof in 1966 building leaks in a number of places and needs to be replaced.

Depends upon funding

$

86,000

Electronic medical record system for resident Electronic medical records will result in more accurate records and instructions. It will Depends upon records enable faster sharing of health information and bring modern technology to the facility. funding

$

99,000

$

270,000

T O

P P A

8/1/2009

Funding Request

Route (Infrastructure Only)

N s

Mason County Historical Society

t s e

Port of Ludington Maritime Museum

R d

Mason County's Oakview Medical Care Facility Ludington

Larger walk in cooler and freezer

Mason County's Oakview Medical Care Facility Ludington

Fire suppression system to install overhead sprinkler system

Mason County's Oakview Medical Care Facility Ludington Mason County's Oakview Medical Care Facility Ludington Mason County's Oakview Medical Care Facility Ludington

02262009

e t tt

i m

Mason County's Oakview Medical Care Facility Ludington

S

ub

Add Laundry addition

u q e

The laundry is currently in a renovated garage which does not provide the space necessary for an efficiently run operation. It is also not connected to the facility so laundry must be transported through all types of weather. This creates numerous safety issues for the staff.

Submitted Requests - Not Approved

Depends upon funding

342 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Expected Completion Date

Start Date

Air Condition 1966 Building

The 1966 building is not air conditioned in the resident, public, or staff areas. It is mandated by nursing home rules that the temperature in resident areas be controlled within specific parameters for the comfort and well being of the residents. This Depends upon necessitates the use of window air conditioners which are very inefficient. funding

Remodel old 1966 wing into private resident rooms

The current wing house the nursing administrative offices. If it were renovated back to 14 private resident rooms and 14 existing resident rooms were made private this would result in 28 private resident rooms, greatly increasing the quality of life for those Depends upon residents. funding

Build Nursing Administrative office wing

The current nursing administrative offices are located in a wing of the 1966 building that used to be resident rooms. This makes efficient space usage difficult. If office areas were available these rooms could be converted into private resident rooms.

Mason County's Oakview Medical Care Facility Ludington

Mason County's Oakview Medical Care Facility Ludington

Funding Request

D VE $

500,000

$

950,000

Depends upon funding

$

972,000

Wireless emergency call system for Alzheimer's unit

A wireless call system would eliminate the over head pages and walkie talkies noise in the Alzheimer's unit. It would also provide an opportunity to track the length of time it takes staff to respond to resident calls. The noise reduction would make the facility Depends upon more homelike for the residents. funding

$

30,000

Mason County's Oakview Medical Care Facility Ludington

Wireless emergency call system for Skilled unit

A wireless call system would eliminate the over head pages and walkie talkies noise in the Skilled unit. It would also provide an opportunity to track the length of time it takes Depends upon staff to respond to resident calls. The noise reduction would make the funding

$

40,000

Mason Public Schools Mason

Cedar Elementary

Replace classroom unit-ventalating systems with efficient heating and cooling units

Mason Public Schools Mason

North Aurelius Elementary

Mason Public Schools Mason

Alaiedon Elementary

Mason Public Schools Mason

Steele Elementary

Mason Public Schools Mason

North Aurelius Elementary

Mason Public Schools Mason

Cedar Elementary

Mason Public Schools Mason

Steele Elementary

Mason Public Schools Mason

North Aurelius Elementary

Mason Public Schools Mason

Cedar Elementary

Mason Public Schools Mason

North Aurelius Elementary

Mason County's Oakview Medical Care Facility Ludington Mason County's Oakview Medical Care Facility Ludington

Mason Public Schools Mason Mason Public Schools Mason

S

$

150

Rebuild/replace steam traps and condensate return pipe Renovate restrooms and install low water consumption fixtures, waterless urinals and touch-free controls Renovate restrooms and install low water consumption fixtures, waterless urinals and touch-free controls Renovate restrooms and install low water consumption fixtures, waterless urinals and touch-free controls Renovate restrooms and install low water consumption fixtures, waterless urinals and touch-free controls

6/10/2009

8/31/2009

$

25,000

6/10/2009

8/31/2009

$

30,000

6/10/2009

8/31/2009

$

30,000

6/10/2009

8/31/2009

$

40,000

6/10/2009

8/31/2009

$

40,000

Replace old roofing membrane and add insulation

6/10/2009

8/31/2009

$

40,000

Replace windows with low-E glass 6/10/2009 Remove asbestos containting materials (ACM) and replace with non-ACM insulation and floor tile 6/10/2009

8/31/2009

$

60,000

8/31/2009

$

120,000

Replace classroom unit-ventalating systems with efficient heating and cooling units

6/10/2009

8/31/2009

$

150,000

Alaiedon Elementary

Replace classroom unit-ventalating systems with efficient heating and cooling units

6/10/2009

8/31/2009

$

150,000

Steele Elementary

Replace classroom unit-ventalating systems with efficient heating and cooling units Remove asbestos containting materials (ACM) and replace with non-ACM insulation and floor tile Remove asbestos containting materials (ACM) and replace with non-ACM insulation and floor tile Remove asbestos containting materials (ACM) and replace with non-ACM insulation and floor tile Install natural gas piping to building (approx. 2.5 miles) and convert boilers from fuel oil to gas.

6/10/2009

8/31/2009

$

150,000

6/10/2009

8/31/2009

$

200,000

6/10/2009

8/31/2009

$

200,000

6/10/2009

8/31/2009

$

200,000

6/10/2009

8/31/2009

$

225,000

d e t

North Aurelius Elementary

Alaiedon Elementary

Mason Public Schools Mason

Steele Elementary

Mason Public Schools Mason

Alaiedon Elementary

02262009

-N

8/31/2009

ub

Mason Public Schools Mason

P P A 6/10/2009

tt i m

Mason Public Schools Mason

T O

O R

s t s

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

343 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Mason Public Schools Mason

North Aurelius Elementary

Install new vestibule at south west entrance

6/10/2009

8/31/2009

$

10,000

Mason Public Schools Mason

Steele Elementary

Repair and Resurface Parking lot

6/10/2009

8/31/2009

$

60,000

Gymnasium rennovation and addition

The renovation of and addition to our 41 year old gymnasium. This would include renovation of locker rooms and shower facilities for boys and girls. Replacement of the gym floor. Replacement of PA and Scoreboards. The replacement of the orignal wood bleachers. The addition of locker room and shower facilities for boys and girls. The addition of storage facilities and concession area. The addition of gym area for class use. The renovation of the building's energy management system. 9/1/2009

$

2,750,000

MBS Terminal

Shovel Ready MBS Airport Terminal Will Provide Immediate Jobs The new MBS International terminal building, which has been in the research planning, design and development stages for the last six years, is now ready for construction crews. $24 million dollars of funding is needed to complete the project. Through prudent financial management, MBS Airport has also pledged $10 million of its own funds, over 20% of the total $48 million cost, for the new terminal. The MBS terminal will employ 250 workers during construction. These well paying jobs will last throughout the three to five years the terminal is under construction, and will have a significant overall positive economic impact on the region. This is in addition to the $100 million annually that MBS now contributes to the region’s economy. The Great Lakes Bay Regional Alliance, an economic development consortium of business and community leaders, from Midland, Bay and Saginaw counties with a proven track record of collaboration, has made MBS Airport its number one priority. Our leading corporations, The Dow Chemical Company and Dow Corning Corporation , consider the new terminal crucial 4/1/2009

4/1/2014

$

48,000,000

2010

$

222,000,000

Mayville Community School District

Mayville

T O

MBS international Airport Commission

Tittabawassee Twp.

e u

d e tt

t i m

McBain Renewwable Energy Park

P P A

N s

st

The McBain Renewable Energy Park is a multi energy producing park, run by renewable energy processes, producing products and by-products to be used in related processes. The cornerstone of the project is an existing 18 MW electric station in McBain, currently fueled by wood and recycled tire derived fuel, but will produce 50 MW of thermal energy to power adjacent facilities. This power plant will produce both steam and electricity, and can power the ethanol and biodiesel production. CO2 will produce Enhanced Oil Recovery (EOR) and Algae production; Corn Bran for Power Plant Fuel; Corn Oil for Biodiesel Feedstock; Succinic Acid for Plastics; and DDG's for Food, Fuel and Power Plant Fuel. The Glycerin produced from biodiesel can be used in soaps and pharmaceuticals, and fuel for the power plant. Anaerobic digestion converts organic agricultural by-products into methane and CO2, to be used to power engine generators, or as a fuel in the power plant. CO2 will be recovered and Algae production can be fed CO2 from power plant flue gas, and will capture the carbon, release oxygen, producing up to 10,000 gallons of ethanol per acre annually. District E

q e R

O R 6/30/2010

D VE

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

344 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Remus (Chppewa Hills Mecosta-Osceola ISD HS area), Michigan

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

02262009

Central Park Splash Pad

Central Park is located at 5151 Marsh Road, Okemos, Michigan. The proposed sprayscape/splash pad will provide a universally accessible area for water play within a large community park. 5/2/2009

P P A

O R

Funding Request

12,000,000

8/1/2009

$

300,000

Towner Road Park Development

Construct a multi-use community park on a 22-acre site located at 2055 Towner Road, Meridian Township, Michigan. This beautiful site features woods, wetlands, a remnant prairie, and open space features that lend themselves to both active and passive recreation opportunities. We envision a destination spot that will attract park users of all ages and with a variety of interests including soccer, lacrosse, baseball, hiking, bird watching, picnicking, outdoor environmental education, and many other uses. 5/1/2009

6/1/2010

$

1,300,000

Inter-Urban Off-Road Trail Phase II

Construct 1.1 miles of paved off-road east-west trail along the north side of the Canadian National railroad tracks from Okemos Road to Marsh Road. This is a continuation of the section completed in 2007 west of Okemos Road and will provide a 2 mile off-road trail. 6/2/2009

11/1/2009

$

300,000

The proposed dog park will be located within an existing community park, Legg Park, located at 3891 Van Atta Road, Okemos, Michigan. Improvements include fencing a 4-acre area, parking and entrance construction, paths, utilities, restroom and pavilion 6/1/2009

10/1/2009

$

350,000

North Meridian Road Park is located at 5191 N. Meridian Road. Park improvements include the construction of an all-seasons pavilion, restrooms, accessible walkways, trail improvements, and landscaping at this popular community park. 6/1/2009

5/1/2010

$

550,000

Smith Drain Off-road Trail

Construct 1.5 mile paved off-road north-south trail along the Smith Drain from Jolly Road to Sower Boulevard. This trail will intersect an existing 1.2 mile off-road eastwest trail that connects to a Township park and to Okemos High School.

10/1/2010

$

400,000

Indiana Rd Water & Sewer Mains

Install 750 feet of water main and 750 feet of sewer main from Jolly Road to the north end of Indiana Road to serve existing homes that are currently on wells and septic systems. 5/2/2009

8/1/2009

$

150,000

Towner Rd Water Main

Install 3,000 feet of water main to serve existing homes and businesses that are currently on wells, and to close a loop in the water main system to increase system reliability.

10/1/2009

$

350,000

7/1/2010

$

2,500,000

d e t

itt

T O

st

e u

q e R

N s

4/2/2010

4/1/2009

Construct new sanitary sewage pump station at the Township’s Service Center and 6,000 feet of 16 inch force main from east of Okemos Road to Small Acres Lane to N. Okemos Rd. Sanitary Sewage Pump Sta & provide relief to our main pump station and to provide additional capacity for additiona Force Main areas to develop. 5/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

m b u

S

Meridian Township

Start Date

Wind Turbines

North Meridian Road Park Improvement

Meridian Township

Project Description

The MOISD has been working with Alternative Energy Solutions (AED) of Eastpointe, MI for the past year on the installation of four 1.5-Mega Watt Turbines for the five MOISD public and one charter schools. The energy would also power the educational portions of three juvenile facilities run by the ISD on the U.S. 10 corridor. We are at the data gathering/virtual wind study stage as we have interest from a private Michigan investor group to help build the project and put the MOISD as purchasers of the created energy. Since comparable turbines are located in McBain, much of the wind-testing, environmental studies, etc. could be shortened. The infusion of Federal dollars would change our current agreements, but could be adapted quickly as we have an excited group of private investors to put "green" dollars into schools. We plan on opening a corresponding program at our Career Center on Alternative Energy once the Turbines get under way. Since this is a private-public partnership, we would be willing to adjust the dollar request downward if our orginal estimations are too high. Currently, we are estimating a total project of $12 million.

Legg Park Dog Park

Meridian Township

Meridian Township

Project Name

Expected Completion Date

345 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Meridian Township

Meridian Township

Sleepy Hollow Dr Water & Sewer Mains

Meridian Township

Meridian Township

Replace Sub-Standard Water Mains

Install 2,500 feet of water main and 2,500 feet of sewer main south of Lake Lansing Road to serve existing homes that are currently on wells and septic systems. This wil improve the health and safety for these residents. 8/1/2009 Replace several thousand feet of deteriorated and /or undersized water main to improve capacity and reliability of the water system. 8/1/2009

Lining Sanitary Sewers

Treat for roots, clean, and line several thousand feet of leaking sanitary sewer main to prevent infiltration/ inflow of storm water and ground water into the sanitary sewers, and to increase the life of the sewers. This project will reduce maintenance and sewage treatment costs. 6/1/2009

Towner Road Park Development

Construct a multi-use community park on a 22-acre site located at 2055 Towner Road, Meridian Township, Michigan. This beautiful site features woods, wetlands, a remnant prairie, and open space features that lend themselves to both active and passive recreation opportunities. We envision a destination spot that will attract park users of all ages and with a variety of interests including soccer, lacrosse, baseball, hiking, bird watching, picnicking, outdoor environmental education, and many other uses. 5/9/2009

Central Park Splash Pad

Central Park is located at 5151 Marsh Road, Okemos, Michigan. The proposed sprayscape/splash pad will provide a universally accessible area for water play within a large community park. 5/9/2009

Indiana Rd Water & Sewer Mains

Install 750 feet of water main and 750 feet of sewer main from Jolly Road to the north end of Indiana Road to serve existing homes that are currently on wells and septic systems. 5/9/2009

Towner Rd Water Main

Install 3,000 feet of water main to serve existing homes and businesses that are currently on wells, and to close a loop in the water main system to increase system reliability.

Legg Park Dog Park

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Expected Completion Date

$

700,000

$

1,000,000

$

1,500,000

6/10/2009

$

1,300,000

8/9/2009

$

300,000

8/9/2009

$

150,000

4/9/2009

10/9/2009

$

350,000

The proposed dog park will be located within an existing community park, Legg Park, located at 3891 Van Atta Road, Okemos, Michigan. Improvements include fencing a 4-acre area, parking and entrance construction, paths, utilities, restroom and pavilion 6/9/2009

10/9/2009

$

350,000

Meridian Township

North Meridian Road Park Improvement

North Meridian Road Park is located at 5191 N. Meridian Road. Park improvements include the construction of an all-seasons pavilion, restrooms, accessible walkways, trail improvements, and landscaping at this popular community park. 6/9/2009

5/10/2009

$

550,000

Meridian Township

Construct new sanitary sewage pump station at the Township’s Service Center and 6,000 feet of 16 inch force main from east of Okemos Road to Small Acres Lane to N. Okemos Rd. Sanitary Sewage Pump Sta & provide relief to our main pump station and to provide additional capacity for additiona Force Main areas to develop. 5/9/2009

7/10/2009

$

2,500,000

Inter-Urban Off-Road Trail Phase II

Construct 1.1 miles of paved off-road east-west trail along the north side of the Canadian National railroad tracks from Okemos Road to Marsh Road. This is a continuation of the section completed in 2007 west of Okemos Road and will provide a 2 mile off-road trail. 6/9/2009

11/9/2009

$

300,000

Lining Sanitary Sewers

Treat for roots, clean, and line several thousand feet of leaking sanitary sewer main to prevent infiltration/ inflow of storm water and ground water into the sanitary sewers, and to increase the life of the sewers. This project will reduce maintenance and sewage treatment costs. 6/9/2009

8/10/2009

$

1,500,000

Sleepy Hollow Dr Water & Sewer Mains

Install 2,500 feet of water main and 2,500 feet of sewer main south of Lake Lansing Road to serve existing homes that are currently on wells and septic systems. This wil improve the health and safety for these residents. 8/9/2009

8/10/2009

$

700,000

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

d e tt

t i m

b u S

Meridian Township

Meridian Township

Meridian Township

02262009

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

8/1/2010

Funding Request

10/2/2010

P P A

O R 8/1/2010

D VE

Route (Infrastructure Only)

346 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Meridian Township

Meridian Township

Smith Drain Off-road Trail

Meridian Township

Meridian Township

Replace Sub-Standard Water Mains

Construct 1.5 mile paved off-road north-south trail along the Smith Drain from Jolly Road to Sower Boulevard. This trail will intersect an existing 1.2 mile off-road eastwest trail that connects to a Township park and to Okemos High School. Replace several thousand feet of deteriorated and /or undersized water main to improve capacity and reliability of the water system.

Meridian Township

Meridian Township, Ingham County

Smith Drain Off-road Trail

Construct 1.5 mile paved off-road north-south trail along the Smith Drain from Jolly Road to Sower Boulevard. This trail will intersect an existing 1.2 mile off-road eastwest trail that connects to a Township park and to Okemos High School.

Meridian Township Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township, Ingham County Meridian Township, Ingham County

Meridian Township, Ingham County

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

u S

Meridian Township

Meridian Township

Meridian Township

02262009

Expected Completion Date

4/10/2009

10/10/2009

8/9/2009

10/10/2009

$

400,000

$

1,000,000

$

400,000

8/10/2009

$

700,000

O R

4/10/2009

Funding Request

10/10/2009

D VE

Replace Sub-Standard Water Mains

Install 2,500 feet of water main and 2,500 feet of sewer main south of Lake Lansing Road to serve existing homes that are currently on wells and septic systems. This wil improve the health and safety for these residents. 8/9/2009 Replace several thousand feet of deteriorated and /or undersized water main to improve capacity and reliability of the water system. 8/9/2009

10/10/2009

$

1,000,000

Lining Sanitary Sewers

Treat for roots, clean, and line several thousand feet of leaking sanitary sewer main to prevent infiltration/ inflow of storm water and ground water into the sanitary sewers, and to increase the life of the sewers. This project will reduce maintenance and sewage treatment costs. 6/9/2009

8/10/2009

$

1,500,000

Farmers' Market Expansion

The farmers’ market is currently located within an aging pavilion within Central Park, located at 5151 Marsh Road, Okemos, Michigan. The market has a positive economic impact on our community but has outgrown its current building years ago. The proposed enhancements include an expansion of the pavilion, restroom renovations, an outdoor café/gathering area, increased parking, and improved pedestrian and vehicular circulation. 4/1/2010

10/1/2010

$

600,000

Wonch Park Improvement

Located at 4545 Okemos Road, Okemos, Michigan (within the Okemos DDA district), improvements to Wonch Park include a new pavilion, accessible pathways, utilities, benches, fishing dock/canoe launch, plaza with fountain, and expansion and resurfacing of a parking lot. 4/1/2010

12/1/2010

$

915,000

The Harris Nature Center is located at 3998 Van Atta Road, Okemos, Michigan. The proposed building expansion will add additional meeting, activity, and classroom space. 4/1/2010

7/1/2011

$

1,025,000

The proposed pedestrian bridge is located in Legg Park, 3891 Van Atta Road, Okemos, Michigan. The bridge will replace a former bridge that was washed out in a major flood event several years ago. The absence of this bridge is significant because park users are currently unable to access large portions of the park during the wet season. 6/1/2010

10/1/2010

$

175,000

Herron Road Sewer Main

Install 1,800 feet of sewer main from Mount Hope Road to the northeast end of Herron Road to replace the existing sewer leads that cross the Herron Creek Drain. These leads must be removed to allow required maintenance of the drain. The new sewer will also provide sewer service to homes on the north side of Herron Road.

8/2/2009

12/2/2009

$

250,000

Hickory Island Water Main

Install 2,150 feet of water main to serve existing homes that are currently on wells, and to close a loop in the water main system to increase system reliability around Lake Lansing.

8/2/2009

6/1/2010

$

350,000

Kansas Road Water & Sewer Mains

Install 2,000 feet of water main and 2,000 feet of sewer main from Jolly Road to the north end of Kansas Road to serve existing homes that are currently on wells and septic systems.

8/1/2009

12/1/2009

$

400,000

Okemos Rd Non-motorized Pathway Bridge

Construct non-motorized bridge across the Red Cedar River on the west side of Okemos Road to connect a large Township park and downtown Okemos to an elementary school and neighborhood south of the river. The new bridge will eliminate the existing safety concern for both pedestrians and bicyclists crossing the river. 4/1/2010

8/1/2010

$

450,000

Sleepy Hollow Dr Water & Sewer Mains

Harris Nature Center Expansion

d e tt

A T

q e R

Legg Park Pedestrian Bridge

it

bm

e u

st

s

PP

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

347 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Project Name

Meridian Township, Ingham County Meridian Township, Ingham County

02262009

Start Date

Sylvan Glen Rd Water & Sewer Mains

Install 3,900 feet of water main and 3,900 feet of gravity sewer main and force main from Dobie Road to the east end of Sylvan Glen Road to serve existing homes that are currently on wells and septic systems.

Okemos Rd Non-motorized Pathway Bridge

Construct non-motorized bridge across the Red Cedar River on the west side of Okemos Road to connect a large Township park and downtown Okemos to an elementary school and neighborhood south of the river. The new bridge will eliminate the existing safety concern for both pedestrians and bicyclists crossing the river. 4/10/2009

Hickory Island Water Main

Install 2,150 feet of water main to serve existing homes that are currently on wells, and to close a loop in the water main system to increase system reliability around Lake Lansing.

8/9/2009

Kansas Road Water & Sewer Mains

Install 2,000 feet of water main and 2,000 feet of sewer main from Jolly Road to the north end of Kansas Road to serve existing homes that are currently on wells and septic systems.

8/9/2009

Sylvan Glen Rd Water & Sewer Mains

Install 3,900 feet of water main and 3,900 feet of gravity sewer main and force main from Dobie Road to the east end of Sylvan Glen Road to serve existing homes that are currently on wells and septic systems.

PP

Herron Road Sewer Main

Install 1,800 feet of sewer main from Mount Hope Road to the northeast end of Herron Road to replace the existing sewer leads that cross the Herron Creek Drain. These leads must be removed to allow required maintenance of the drain. The new sewer will also provide sewer service to homes on the north side of Herron Road.

Farmers' Market Expansion

The farmers’ market is currently located within an aging pavilion within Central Park, located at 5151 Marsh Road, Okemos, Michigan. The market has a positive economic impact on our community but has outgrown its current building years ago. The proposed enhancements include an expansion of the pavilion, restroom renovations, an outdoor café/gathering area, increased parking, and improved pedestrian and vehicular circulation. 4/10/2009

Wonch Park Improvement

Located at 4545 Okemos Road, Okemos, Michigan (within the Okemos DDA district), improvements to Wonch Park include a new pavilion, accessible pathways, utilities, benches, fishing dock/canoe launch, plaza with fountain, and expansion and resurfacing of a parking lot. 4/10/2009

8/2/2009

s

t s e

D VE $

350,000

12/9/2009

$

400,000

8/9/2009

12/9/2009

$

500,000

8/9/2009

12/9/2009

$

250,000

10/10/2009

$

600,000

O R 6/10/2009

12/10/2009

$

915,000

10/10/2009

$

175,000

The Harris Nature Center is located at 3998 Van Atta Road, Okemos, Michigan. The proposed building expansion will add additional meeting, activity, and classroom space. 4/10/2009

7/11/2009

$

1,025,000

Farmers' Market Expansion

The farmers’ market is currently located within an aging pavilion within Central Park, located at 5151 Marsh Road, Okemos, Michigan. The market has a positive economic impact on our community but has outgrown its current building years ago. The proposed enhancements include an expansion of the pavilion, restroom renovations, an outdoor café/gathering area, increased parking, and improved pedestrian and vehicular circulation. 4/10/2009

10/10/2009

$

600,000

Wonch Park Improvement

Located at 4545 Okemos Road, Okemos, Michigan (within the Okemos DDA district), improvements to Wonch Park include a new pavilion, accessible pathways, utilities, benches, fishing dock/canoe launch, plaza with fountain, and expansion and resurfacing of a parking lot. 4/10/2009

12/10/2009

$

915,000

Harris Nature Center Expansion

The Harris Nature Center is located at 3998 Van Atta Road, Okemos, Michigan. The proposed building expansion will add additional meeting, activity, and classroom space. 4/10/2009

7/11/2009

$

1,025,000

R d

e t tt

Legg Park Pedestrian Bridge

i m

Harris Nature Center Expansion

Submitted Requests - Not Approved

Route (Infrastructure Only)

500,000

450,000

u q e

8/10/2009

$

$

A T

O N

12/2/2009

Funding Request

The proposed pedestrian bridge is located in Legg Park, 3891 Van Atta Road, Okemos, Michigan. The bridge will replace a former bridge that was washed out in a major flood event several years ago. The absence of this bridge is significant because park users are currently unable to access large portions of the park during the wet season. 6/10/2009

b u S

Meridian Township, Ingham County

Project Description

Expected Completion Date

348 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township

Meridian Township, Ingham County

Herron Road Sewer Main

Install 1,800 feet of sewer main from Mount Hope Road to the northeast end of Herron Road to replace the existing sewer leads that cross the Herron Creek Drain. These leads must be removed to allow required maintenance of the drain. The new sewer will also provide sewer service to homes on the north side of Herron Road.

8/9/2009

Hickory Island Water Main

Install 2,150 feet of water main to serve existing homes that are currently on wells, and to close a loop in the water main system to increase system reliability around Lake Lansing.

8/9/2009

Kansas Road Water & Sewer Mains

Install 2,000 feet of water main and 2,000 feet of sewer main from Jolly Road to the north end of Kansas Road to serve existing homes that are currently on wells and septic systems.

8/9/2009

6/10/2009

$

350,000

12/9/2009

$

400,000

Okemos Rd Non-motorized Pathway Bridge

Construct non-motorized bridge across the Red Cedar River on the west side of Okemos Road to connect a large Township park and downtown Okemos to an elementary school and neighborhood south of the river. The new bridge will eliminate the existing safety concern for both pedestrians and bicyclists crossing the river. 4/10/2009

8/10/2009

$

450,000

Sylvan Glen Rd Water & Sewer Mains

Install 3,900 feet of water main and 3,900 feet of gravity sewer main and force main from Dobie Road to the east end of Sylvan Glen Road to serve existing homes that are currently on wells and septic systems.

8/9/2009

12/9/2009

$

500,000

Inter-Urban Off-Road Trail Phase II

Construct 1.1 miles of paved off-road east-west trail along the north side of the Canadian National railroad tracks from Okemos Road to Marsh Road. This is a continuation of the section completed in 2007 west of Okemos Road and will provide a 2 mile off-road trail. 6/9/2009

11/9/2009

$

300,000

Legg Park Dog Park

The proposed dog park will be located within an existing community park, Legg Park, located at 3891 Van Atta Road, Okemos, Michigan. Improvements include fencing a 4-acre area, parking and entrance construction, paths, utilities, restroom and pavilion 6/9/2009

10/9/2009

$

350,000

North Meridian Road Park Improvement

North Meridian Road Park is located at 5191 N. Meridian Road. Park improvements include the construction of an all-seasons pavilion, restrooms, accessible walkways, trail improvements, and landscaping at this popular community park. 6/9/2009

5/10/2009

$

550,000

Central Park Splash Pad

Central Park is located at 5151 Marsh Road, Okemos, Michigan. The proposed sprayscape/splash pad will provide a universally accessible area for water play within a large community park. 5/9/2009

8/9/2009

$

300,000

Meridian Township, Ingham County

Towner Road Park Development

Construct a multi-use community park on a 22-acre site located at 2055 Towner Road, Meridian Township, Michigan. This beautiful site features woods, wetlands, a remnant prairie, and open space features that lend themselves to both active and passive recreation opportunities. We envision a destination spot that will attract park users of all ages and with a variety of interests including soccer, lacrosse, baseball, hiking, bird watching, picnicking, outdoor environmental education, and many other uses. 5/9/2009

6/10/2009

$

1,300,000

Meridian Township, Ingham County

Construct new sanitary sewage pump station at the Township’s Service Center and 6,000 feet of 16 inch force main from east of Okemos Road to Small Acres Lane to N. Okemos Rd. Sanitary Sewage Pump Sta & provide relief to our main pump station and to provide additional capacity for additiona Force Main areas to develop. 5/9/2009

7/10/2009

$

2,500,000

Meridian Township, Ingham County

Install 750 feet of water main and 750 feet of sewer main from Jolly Road to the north end of Indiana Road to serve existing homes that are currently on wells and septic systems. 5/9/2009

8/9/2009

$

150,000

Meridian Township, Ingham County Meridian Township, Ingham County

Meridian Township, Ingham County Meridian Township, Ingham County

Meridian Township

Meridian Township, Ingham County Meridian Township, Ingham County

b u S

02262009

Indiana Rd Water & Sewer Mains

N s

t s e

u q e

Submitted Requests - Not Approved

O R

P P A

R d

e t tt

i m

T O

10/10/2009

D VE

250,000

Meridian Township

Meridian Township

Legg Park Pedestrian Bridge

Funding Request

$

Meridian Township, Ingham County

Meridian Township, Ingham County

Meridian Township

Start Date

175,000

Meridian Township, Ingham County

Meridian Township

Project Description

The proposed pedestrian bridge is located in Legg Park, 3891 Van Atta Road, Okemos, Michigan. The bridge will replace a former bridge that was washed out in a major flood event several years ago. The absence of this bridge is significant because park users are currently unable to access large portions of the park during the wet season. 6/10/2009

$

Meridian Township

Meridian Township

Project Name

Expected Completion Date

12/9/2009

Route (Infrastructure Only)

349 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Meridian Township

Merrill Community Schools

Merrill Township

Project Name

Project Description

Start Date

Install 3,000 feet of water main to serve existing homes and businesses that are currently on wells, and to close a loop in the water main system to increase system reliability.

Meridian Township, Ingham County

Towner Rd Water Main

Merrill/Jonesfield Township

Essential rennovations to Merrill Elementary, Merrill Middle and Merrill High Schools including roof insulation and repairs, energy efficiency upgrades to heating/cooling systems. This project was engineered by the architectural firm Kingscott Associates and by Granger Construction. Cost estimates and project scope are ready to be Merrill Community Schools Rennovations and implemented. Please see additional data contained in the additional sheets as listed Community Center on the tabs below. 4/1/2009

Bitely/Merrill Township

Expected Completion Date

4/9/2009

Merrill twp Green Project

We currently have a large Community building with major needs for enhancements, weatherization. We are looking to replace roof with metal (currently old shingleleaking) Desperate in need of efficient furnace, hoping to install geothermal, solar panels and a wind generator. We need to have more insulation. We would like to use our community for local projects, meetings and communication, senior citizen services etc 5/1/2009

T O

10/9/2009

P P A

O R 8/31/2010

Funding Request

$

350,000

D VE

8/1/2010

$

200,000

11/1/2010

$

550,000

12/1/2009

$

150,000

Merrill Township

Bitely/Merrill Township

Merrill Twp Housing project

We live in a very poor community, which primarily consists of senior citizens living in poverty and substandard housing, our winters are long and severe. We are looking to provide an apartment complex in our community to assist our seniors. We need to have low income housing and provide them with support locally. 7/1/2009

Merrill Township

Bitely/Merrill Township

Merrill Twp Internet

We currently only have dial up available for everyone. It is almost impossible to take care of daily functions through the township. Our businesses are also suffering.

Merrill Twp Transfer Station/recycle

we currently have our own transfer station which we fund with millage. We are looking to expand, offer and encourage our citizens to recycle which would save our dollars overall. It is important to lean that direction and expand our services. We would like to have easy recycle access, bins for citizens to separate trash and education to encourage compliance within ouor community. 3/1/2009

8/1/2009

$

50,000

The Michigan Association of Non-public Schools (MANS) package will retrofit schools with more energy efficient lighting, installing water saving shower heads and faucet aerators, and performing energy conservation audits. This creates jobs in the manufacturing industry through the use of energy efficient fluorescent lighting fixtures made in Michigan by Alumalight to retrofit less efficient metal halide lighting systems in high bay areas such as gymnasiums. Fluorescent lamp and ballast retrofit kits will replace older fluorescent lighting in classrooms. Construction trades will be used for the installation of the lighting fixtures and water conservation devices. The implementation will employ people living in Michigan to conduct building surveys and project implementation. In addition, administrators, teachers, students, housekeeping personnel and maintenance technicians in schools will be involved in the projects. An estimated sixty-two people will be employed to accomplish the work. The project can be completed in one year. This package supports the Economic Stimulus Package as well as the Michigan Energy Optimization Plan. The plan provides jobs for Michiga 7/9/2009

8/10/2009

$

5,000,000

Merrill Township

Bitely/Merrill Township

N s

6/1/2009

t s e

u q e

Route (Infrastructure Only)

R d

i m

ub

Michaigan Association Various throughout of Non-public Schools Michigan

e t tt

Lighting and water retrofit

S 02262009

Submitted Requests - Not Approved

350 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Council for Arts and Cultural Affairs

Michigan Festivals and Events Association (MFEA) [the associated Foundation is the 501(c) 3 NonProfit that would receive/administer any funding] Sue Bila, Executive Director, CFEE, 144 S Saginaw Street, Chesaning MI 48616, 989-845-2080 [email protected] [hi

Traverse City

Project Name

Project Description

City Opera House Phase III Renovation

Start Date

This is the third and final phase of a comprehensive renovation of the 750 seat Victorian era City Opera House located in downtown Traverse City, Michigan. Construction documents have been completed for Phase III, ready for immediate construction. The Opera House serves as a multi-use community space including performing arts, music, banquets and weddings. Phase I and II involved both public and private funds during a seven-year 8.3 million restoration and upgrade completed in 2006. Major upgrades included; structural, mechanical, electrical, life safety and accessibility upgrades in the three story structure. Scope remaining as part of Phase III include: recreating historic decorative painting in the auditorium, balcony and lobby, Auditorium chandelier, installation of a decorative acoustical ceiling and woodwork in the lobby including a concessions counter, fitting out the third floor restrooms and backstage dressing rooms, sound booth and stage lighting equipment, catering kitchen equipment and exterior masonry cleaning and pointing. Sustainable features include; use of regional materials and labor ,energy conserving lighting fixtures, plumbimmediate

T O

N s

Funds would be used to complete the restoration of a 1908 Carriage House (with addition) located along Downtown Chesaning's mainstreet. Immediately upon completion, the structure would house the offices of the association/foundation and provide a showcas [email protected]

Expected Completion Date

t s e

u q e

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

6 months

$

1,050,500

Carriage House Renovation and Addition on Pearl Street to establish the Michigan Festivals and Events Association Headquarters, Foundation Offices, Showcase and National Training Center

Work can begin once the Economic Chesaning, MI Stimulus Package (Saginaw County) is enacted.

R d

i m

b u S

Michigan Flywheelers Museum South Haven / Geneva

02262009

e t tt

Stephenson Education and Cultural Building

Dedicated to the preservation and restoration of antique farming equipment, the Michigan Flywheelers Museum has been in need of a main building that can be used for educational displays, instructional programming and skill-building workshops for large audiences especially during its Farm History Day event when over 1,200 local school students visit the museum for a day of hands-on learning activities. Currently, these activities are held outside and are contingent on the weather. In 2006, a 100year-old barn was moved to the museum with the goal of renovating it for use as the main building. The renovation process began immediately - a new roof was installed, a cement floor poured, in-floor heating put in and handicap accessible entrances were added. The next step of the project will be replacing the exterior wood siding on the walls, and adding insulation to make the barn energy efficient. Once the restoration is completed, the museum will have a facility that will allow for activities to be held throughout the calendar year instead of just the summer months. This in turn, should increase visitor attendance at workshops and educational programs and provide a pla 5/9/2009

Submitted Requests - Not Approved

Oct. 2009

$

58,000

351 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Michigan Government Television (MGTV) Lansing, Michigan

Michigan Government Television (MGTV), a non-profit 501(c) 3 corporation, is the sole provider to Michigan residents of live and taped coverage of State Government via cable television. This funding request is to redesign the MGTV website to allow updated content including more archived and streaming video. The cost is $92,000, ($67,000 for one-time capital costs and $25,000 in operating costs for the first year). Costs include site design, software and hardware for the conversion of broadcast files into web formats, live streaming of video, and the engineering and integration for master control. The project requires high speed broadband to deliver video files and servers with enough bandwidth for streaming video. This would make programming more available to K-12 schools, higher education and the general public. More of our archives, housed at Michigan State University, would also be available on our site.. MGTV Web Site & Video Streaming Project: The House and Senate stream sessions live on the web and MGTV would like to Increasing Online Outreach stream press conferences, the Supreme Court and other programs. 5/1/2009

Michigan Government Television (MGTV) Lansing, Michigan

MGTV, a non-profit 501(c) 3 corporation is the sole provider to Michigan residents of live and taped coverage of state government. MGTV’s non-partisan programming promotes transparency in government, reaching a statewide audience of 1.5 million Michigan households via cable operators who provide our funding on a per subscriber basis. We request $225,000 for infrastructure improvements. As a first step to expand hours, we would double server capacity to record more state programming, add necessary hardware and software, add uninterrupted power to protect equipment, and replace analog equipment. Engineering design, installation, and integration are included. Infrastructure improvements are needed to expand hours and add future employees. We have 6 employees and indirectly affect 15 state employee and private contractors that produce MGTV programming. High unemployment and the transition to digital cable has resulted in the loss of subscribers and revenue for MGTV. We are looking for other sources of revenue, but we need time to make the transition. 5/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

8/1/2009

$

142,000

8/1/2009

$

250,000

7/1/2010

$

4,500,000

N s

Michigan Historic Preservation Netowrk

Grand Rapids

MGTV Capital Improve- ments to Expand State Govt. Trans- parency

t i m

d e tt

Flat Iron Building Redevelopment

t s e

qu

e R

A downtown Grand Rapids renovation project that includes the redevelopment of three adjacent four-story historic landmark buildings, the Flat Iron, Herkner, and Groskopfs buildings. The three building, build between 1860 and 1870 are the oldest buildings o Grand Rapids’ Monroe Center Street. Portions of the buildings have not been occupied since the 1940's. The $4.5M investment will include: • the repair of the historic facades, including window replacement, elevator, cornice repair, exterior sand blasting, and painting • a complete overhaul of the buildings’ interiors, including new HVAC, electrical and plumbing systems, and • the internal connection of the three buildings to create one contiguous floorplan on each floor. Upon completion, the building's 31,500 SF will achieve a LEED Certified designation. 5/1/2009

b u S 02262009

Submitted Requests - Not Approved

352 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Historic Preservation Netowrk

Grand Rapids, Michigan

Project Name

Project Description

Start Date

This project contemplates the repurposing of the former U. S. Post Office and Federal Building in Grand Rapids Michigan, into a downtown location for Ferris State University’s Kendall College of Art and Design. Until recently, the former Federal Building was home to the Grand Rapids Art Museum, and is now vacant. The City of Grand Rapids, which owns the facility, had acquired it for the Museum’s use, and has no further plans for the building. In order to prevent continuing deterioration, the structure is in dire need of repair. Ferris’ plans involve a complete renovation of the facility, including new mechanical and electrical systems, as well as a small addition, to create classroom and office space for Kendall’s academic programs, which will include a new undergraduate Architecture program. There are also plans to make portions of the building available for public use. The facility is listed on the National Ferris State University (Ferris) renovations to Register of Historic Places, and the rehabilitation work being planned will be in former US Post Office and Federal Building in compliance with the Secretary of the Interior’s Standards. In addition, the project has Grand Rapids, Michigan a strong commitment to sustainability, and is expected to seek Leadership in Energy a

A T

Michigan Historic Preservation Network

Bay City

Michigan Historic Preservation Network

Buchanan, Berrien County, Michigan

Michigan Historic Preservation Network

Calumet Township, Houghton County

Bay City City Hall

Buchanan Art Center

Entire roof replacement and increased insulation for approximately 6,000 square feet. Buchanan Art Center is a "Mid-Century Usonian-styled" contributing resource in the the Buchanan Downtown NR Historic District nomination for 2009. May, 2009

t s e

e t tt

i m

b u S Michigan Historic Preservation Network

City of Marshall

02262009

Fitch, Gorham Brooks Inn & Historical Site

Funding Request

Route (Infrastructure Only)

D VE $

27,600,000

8 months

$

1,500,000

O N

u q e

June, 2009

$

49,879

Repair and replace roof of the former Calumet & Hecla Mining Co. Drill Shop. Now owned by the Township, the Drill Shop accommodates a curling rink. Project would remove existing roof, build a new wooden structure, and cover it with standing-seam metal roof over plywood sheathing. 5/1/2009

12/31/2010

$

450,000

Rehabilitation of the circa 1840 Fitch-Gorham-Brooks home in the City of Marshall, Michigan for use as a Bed and Breakfast. Home previously owned by abolitionist Jabez Fitch, national statesman Charles T. Gorham (Assistant Secretary to the Interior of the United States) and city benefactor and early adaptive reuse proponent Harold C, Brooks (Brooks Airport, Brooks Memorial Fountain, City Hall). Standing on a knoll high above the City of Marshall this impressive Greek Revival home was once considered one of the finest homes in Michigan. Celebrated landscape architect Jens Jensen was commissioned to develop its grounds and the home has hosted nearly every Governor of the State of Michigan. From 1921-1978, Harold C. Brooks was personally responsible for saving more than a dozen historic buildings in this town of 8000 allowing it to eventually own the designation of “largest historic landmark district (small urban area)” in the U.S. with more than 850 structures within its borders. In 2004 Marshall was awarded one of Dozen Distinctive Designation awards by the National Trust for Historic Preservation. Returning this structure to again host citizens 3/3/2006

6/30/2010

$

243,500

R d

Repair and replacement of Drill Shop Roof

O R

PP

Bay City’s City Hall is an 1897 Romanesque-style governmental building housing Bay City’s administrative functions, Council Chambers, and four-story atrium with ornamental cast iron columns, railings, and framed skylight. Local architects Pratt and Koeppe are credited with the design. The 111-year-old French clay tile roof system is severely deteriorated and should be replaced in-kind to restore this character-defining building feature. The work will salvage and reuse 50% of the original tiles, making the project far more environmentally sensitive than to require all new material. The intent of the project is to protect and preserve existing historic materials and prevent further loss of original design integrity. Although well maintained by the City, the original roof has never been replaced, attesting to the overall quality of the design and original materials. The last major rehabilitation projects occurred in the 1970s, when the skylights were altered. Many areas of deteriorated roof deck and poorly-functioning gutters are now threatening the entire system and contributing to leaks and damage throughout the building. This project wi immediate

s

Expected Completion Date

Submitted Requests - Not Approved

353 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Historic Preservation Network

Coldwater, Michigan

Project Name

Project Description

Start Date

Expected Completion Date

Tibbits Opera House Restoration

Restoration and rehabilitation of the 126-year-old Tibbits Opera House, listed in the Michigan Register of Historic Places, including construction of backstage facilities, an expanded lobby and attached offices. Restoration will include removal of the 1960s brick facade, stabilization of original masonry (with complete replacement only as a last resort), and faithful restoration of missing architectural ornament. New windows and doors will be selected to be both historically accurate and energy efficient. All work will meet the Secretary of the Interior's Standards for Treatment of Historic Property. Rehabilitation of the interior will involve re-establishment of the building's primary features and spaces, adaptive reuse of secondary spaces, and new electrical, mechanical, and plumbing systems. New construction will be designed to meet both LEED certification standards, and Standards 9 and 10 of the Secretary of the Interior's Standards for Rehabilitation. All work will be designed to promote energy conservation and sustainability to the highest extent possible. Tibbits is the center forAs soon as funds 9 months after start arts, culture, entertainment and tourism for Branch County and a key landmark along t available

O R

A T

D VE

PP

$

9,000,000

$

3,500,000

9/15/2009

$

400,000

12/1/2009 construction

$

874,000

Fall 2009

$

100,000

Michigan Historic Preservation Network

Ypsilanti

Thompson Block Re-development

The Thompson Block Re-development Project consists of the comprehensive renovation and build-out of a former civil war barracks constructed in 1861 in the historic Depot Town neighborhood of Ypsilanti. This historic building is one of the last remaining historic structures in the area. The building, underutilized since the mid The project is 1960’s will be converted into 16 luxury lofts apartments above 10,000sf of retail / restaurant space at street level. The project, designed by JC Beal Construction Inc., is ready to start, being developed by Beal Properties, LLC, and constructed by JC Beal Construction pending resolution Inc. The project is ready to start, with design and engineering work completed, tax of financial and credits approved, trade contractors selected, and financing in final negotiations with typical closing 8-10 months from several different banks. issues. project start

Michigan Historic Preservation Network

Birmingham

Village Players Annex

Renovation of 1865 house into a rehearsal hall for a community theatre group,

Bloomfield Township

The project calls for the restoration and adaptive use of an historic 1830’s Greek Revival farmhouse. Restored to a mid-19th century timeframe it will become an integral part of a school district’s elementary social studies curriculum as well as a community-wide resource. In 2007, Bloomfield’s historic Barton Farmhouse had become available as a “move it or lose it” proposition. The threat of losing one of the last examples of our early history galvanized leaders of the City of Bloomfield Hills, Bloomfield Township, Bloomfield Hills Schools and the Bloomfield Historical Society to pool their knowledge and resources and work collaboratively to save the house for the benefit of the community. An all-volunteer team raised the funds for the move in a few months from more than 700 community donors. Now the farmhouse is on hold at the Schools’ 80 acre Bowers Farm, the last working farm in Bloomfield, awaiting additional funding for restoration. The house is an authentic example from our agrarian past. When restored, it will be key to helping school children experience life 4/1/2009 Barton House restoration and adaptive reuse on an historic Michigan farm. It will also welcome community events and provide officeconstruction

s

t s e

Funding Request

Route (Infrastructure Only)

O N

3/1/2009

u q e

R d

Michigan Historic Preservation Network

Michigan Historic Preservation Network

i m

ub

S

e t tt

Wexford County Historical Society museum Cadillac, Wexford County copper dome/roof project

02262009

Former Carnegie Library in downtown Cadillac, now county museum, is restoring the former copper dome and repairing the surrounding shingle roof area. Work includes removal of deteriorated materials and installation of new copper batten seam panels, trim and repair/replacement of shingled roof areas. April/May

Submitted Requests - Not Approved

354 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Historic Preservation Network

City of Eaton Rapids

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Eaton Rapids Red Ribbon Hall

From 1879 onwards, the Red Ribbon Hall served as a city center of entertainment and congregation, housing everything from athletic contests, civic meetings, and performances including vaudeville shows, operas, and even a circus. This revival style structure has been a prominent community meetinghouse and entertainment venue since its construction. Currently the Eaton Rapids Area Historical Society with help from the downtown Development authority is reconditioning the structure, a new handicapped entrance and restrooms have been added. A building conditions assessment has been completed and priorities from this show several energy efficiency improvements that need to be made. These improvements include attic insulation, restore foundation, masonry repair, replace windows and front door, installation of new HVAC systems. Mission Statement - The Red Ribbon Hall is a facility for all citizens of Eaton Rapids, a place for activities of all kinds. It is a facility that could bring large groups of people to the downtown area, which would spur economic development in the downtown region of Eaton Rapids. Banquet Facility - Th4/15/2009

October, 2010

$

10,800,000

T O

O R

D VE

P P A

$

149,400 M50 & M99

Michigan Historic Preservation Network

City of Howell

Howell Opera House Preservation and Adapted Re-use

The Opera House in Howell, an historic building housing an original 1881 theatre, was purchased by the Livingston Arts Council in 2000 with the mission to preserve and adapt it for re-use for performance, education and cultural events. The Livingston Arts Council (LAC), a non-profit arts and cultural organization, provides a variety of quality programs and activities for all ages in the community. In 2007 a Masterplan was completed with a 3 phase process. Phase I was completed in May 2007 with the renovation of the first floor level for $2M, $1.6M of which was private donations. The LAC is now seeking fund the final Phases Phase II includes: - upgraded electrical system, new sprinkler system, box office, catering kitchen, theater storage, exterior restoration including windows, passenger elevator, upgraded heating and cooling system, entire building structural reinforcement, restoration of theatre and stage and balcony (2nd and 3rd floors of building), addition to building and fire rated staircase, theatrical audio visual and lighting equipment The renovation of the second level the2/15/2009

Michigan Historic Preservation Network

Detroit

585 Studio

Rehabilitation of a former fire station in downtown Detroit into recording studios and offices.

April, 2009

May, 2010

$

3,000,000

Delta Brewery Rehab Project

Former brewery building at the entrance of Escanaba is being transformed into high end apartment lofts with retail space on the first level. The project will be called the Lofts on Ludington.

February

4/1/2010

$

2,400,000

This project involves restoration and rehabilitation of historic buildings within the Quincy Unit of the Keweenaw National Historical Park to provide a home for the A. E. Seaman Mineral Museum at Michigan Technological University, the official Mineral Museum of Michigan. It will be located in a Heritage Site of the Park, will provide an educational facility for the University and through a partnership arrangement, is targeted by the National Park Service to host the park’s Visitor Center.The site embodies the mining heritage of the Keweenaw Peninsula and will provide 30,000 gross square feet of high quality space by in two buildings of the former Quincy Mining Company, the Machine and Blacksmith Shops. It will present the museum’s collection in a conservation environment and will provide a dynamic experience engaging visitors in the topics of mining heritage, importance of minerals to society, and sustainable extraction of minerals while instilling an appreciation for the natural world. The project will utilize sustainable design, construction, and operational practices, including a geothermal energy heating and cooling system. The project will aim for LE 5/1/2009

11/30/2010

$

17,000,000

Renovation work on National Retistered 1930 spanish style theatre. Plumbing replace last galvanized cold and hot water lines.

4/15/2009

$

10,000

Michigan Historic Preservation Network

Escanaba/Delta County

i m

b u S

Michigan Historic Preservation Network

Franklin Township, Houghton County, Michigan

Michigan Historic Preservation Network

Jackson

02262009

Michigan Theatre

N s

t s e

u q e

R d

e t tt

Route (Infrastructure Only)

Submitted Requests - Not Approved

3/1/2009

355 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Michigan Historic Preservation Network

Jackson

Project Name

Project Description

Start Date

Michigan Theatre

Renovation work on 1930s theatre. Electrical-restoring existing and installing new circuits to improve electrical service for stage shows

3/1/2009

Michigan Historic Preservation Network

Jackson

Michigan Theatre

Renovation work on National Registered 1930 Spanish style theatre. Masonry repair to 4th floor cuppola, and repair to the 3rd floor roof around the cupola to allow the manager's 3rd floor apartment to be renovated, creating a stream of income 4/1/2009

Michigan Historic Preservation Network

Kalamazoo, Kalamazoo County

First Congregational Church of Cooper Repairs

This historic church is in need of several repairs including a new bell rope, furnace repair, and new P.A. system.

Leland / Leland

Fishtown is a working waterfront with a cultural fishing heritage on the National Register in Leland. The Leelanau Tourism Initiative identified Fishtown as the second most important attraction in Leelanau Peninsula, so it is clearly essential to the economics of Leland, the County and northwest Lower Michigan. Fishtown is a rare example of a cultural fishing heritage in that it retains much of the character of the 1800’s commercial fishing village. In Fishtown visitors find the historic working fish Preservation and Infrastructure Improvement tugs, fishery buildings and the on-going activities of commercial, sport fishing and for Historic Fishtown Working Waterfront on shore-based angling. Interwoven into this fishing heritage are local tribal fishermen fo Lake Michigan whom the Fishery provides a market for their fish. 4/1/2009

Michigan Historic Preservation Network

Expected Completion Date

T O

4/1/2009

6/30/2009

$

16,500

D VE $

110,000

Summer 2009

$

2,000

10/1/2010

$

2,270,000 NA

2010

$

750,000

O R

March/April

Funding Request

P P A

-N

Ludington/Mason County Port of Ludington Maritime Museum

Former Coast Guard station being rehabilitated into a maritime museum. City will own the building and Mason Co. Historical Society will rehab/maintain building and manage museum.

Michigan Historic Preservation Network

Marquette County

This is a 48-mile walking/biking trail that connects preserves and interprets the significant historic ore mining sites, structures and stories of Marquette County. The costs proposed cover the materials to surface the trails, signage and trail head costs.

2010

$

1,300,000

Michigan Historic Preservation Network

Menominee, Menomonee County Crawford Inn

Former office building in downtown Menominee is being rehabbed into a 15-room hote with a lounge on the first floor. April/May

Fall 2009

$

1,400,000

Michigan Historic Preservation Network

Milton Township, Cass County

This 1840s church, owned by Milton Township, needs numerous repairs.

March/April

Fall 2009

$

90,000

Rehabilitation of a 1866 historic school house into a learning center for adults and students, which includes displays, archives, and historic materials. This specific project encompasses the rehabilitation of the lower level, which will be the tech center skills learning center, and will house the archives. March/April

Fall 2009

$

41,250

Michigan Historic Preservation Network

Iron Ore Heritage Trail

Smith Chapel Rehabiliation project

d e tt

s t s

e u

q e R

Michigan Historic Preservation Network

Saugatuck, Allegan County

Old School house Discovery Center

Michigan Historic Preservation Network

Sault Ste. Marie, Chippewa County

Federal Building Rehabilitation Project

Former federal building/post office being rehabilitated for new city offices. Work includes ADA complaincy.

April/May

2010

$

3,100,000

Michigan Historic Preservation Network

St. Ignace, Mackinac County

Museum of Ojibwa Culture

Exterior rehabilitation of 171 year old mission church now museum. Project includes repair/replacement of deteriorated wood siding, repair of window sills and trim, painting and installation of wood roof (to replace ashalt shingles).

April/May

Fall 2009

$

100,000

Michigan Historic Preservation Network

Traverse City, Peninsula Twp., Grand Traverse County

Dougherty Historical Home Site

Phase 1 and 2 of rehabilitation plan for the historical Dougherty House. Work includes roof and porch repair, foundation stabilization and door repair/replacement. March/April

Fall 2009

$

117,596

02262009

u S

it

bm

Submitted Requests - Not Approved

Route (Infrastructure Only)

356 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Historic Preservation Network

Michigan Historic Preservation Network

Michigan Historic Preservation Network for Hope Community Church

Michigan Historic Preservation Network for Michigan Sports Hall of Fame Michigan Historic Preservation Network for Old Tiger Stadium Conservancy Michigan Historic Preservation Network for People's Community Church

Michigan Historic Preservation Network Nancy Finegood

Project Name

Project Description

Start Date

In accordance with the completed Historic Structure Master Plan and Economic Feasibility Analyses, rehabilitation work will be accelerated at the Birthplace of the Model T, a National Historic Landmark, towards the eventual establishment of the "Birthplace of the Model T" interpretive site as well as two training centers one for Innovation and and one for Restoration Arts. Work may include a new roof ("white" roof being considered), window and exterior door restoration, plumbing and electrical Accelerated Rehabilitation Work at the upgrades, "greening" of lighting, addition of a serving kitchen, and other structural Birthplace of the Model T, a National Historic repairs to the building. Funding provided will be maximized to carry out as much Landmark rehabilitation work as possible.

Detroit

Expected Completion Date

Work can begin once the Economic Stimulus Package is enacted.

Funding Request

D VE

Within 2 years from the enactment of the Economic Stimulus Package $

1,200,000

Work can begin once the Economic Stimulus Package is enacted.

Within 2 years from the enactment of the Economic Stimulus Package $

4,500,000

1/1/2009

4/1/2010

$

1,500,000

O R

PP

Enhancements to Highland State Recreation Area - Reintroducing a State Park to its Highland State Recreation Region through the addition of Historic Area (Oakland County) Preservation and Cultural Development

Restoration and adaptive reuse of historic properties of former Edsel Ford Estate “Haven Hill.” Includes Gatehouse, Groom’s House and remainder of Sheep Barn. Creation of new amphitheater and sheltered interpretive/exhibit/picnic space. Together, structures will be used to establish a needed cultural hub/enhanced destination for region as well as tourists. Objective is also to optimize the utility of a state recreation area now within a highly urbanized context and better integrate programming with the needs of surrounding communities.

Detroit

Hope Community Church

Interior & exterior restoration of historic Late Gothic Revival church sanctuary & Fellowship addition. Congregation participated in joint MHPN/ Partners for Sacred Places "New Dollars/New Partners" program, defined their community outreach services provided to incl: food (12,800 lbs.)/clothing distribution to over 450 people annually, with total value of outreach services over $250,000 annually.

Michigan Sports Hall of Fame

Interior adaptive re-use of the former Madison Theater Office building in downtown Detroit's theater district on Grand Circus Park, 49,000 sf five floor destination events center incl. Athletes with Disabilities Hall of Fame, incls. Orientation theater, "sacred Hall" with multimedia tributes to honored athletes, banquet capacity for 800, rooftop event space overlooking stadia, rotating exhibits of professional sports franchises, research archives, and sports memorabilia shop. Design accomodates ease of throughput for visiting school groups with emphasis on educational use of sports activities, stats, etc. Oct. 2008

6/1/2010

$

10,350,000

Adaptive re-use of 1923 Navin field stadium structure, 106,000 sf of exhibits, sports retail & restaurant, banquet facility, lease office space, field support services, and preservation of historic baseball field for youth play through collegiate-sanctioned league/championships.

9/1/2008

9/1/2010

$

36,830,000

Interior & Exterior restoration of the historic Norman Gothic Church sanctuary and adjacent Community Buillding. Congregation participated in joint MHPN/ PSP- "New Dollars/New Partners" program, they conduct a daily lunch program. 6/1/2008

6/1/2010

$

1,990,000

Within 2 years from the Work can begin enactment of the once the Economic Stimulus Economic Package, target is Stimulus Package within 1 year of is enacted. enactment $

1,050,000

A T

s

t s e

Detroit

Detroit

Detroit

Tiger Stadium

b u S

Chesaning, Michigan (Saginaw County)

02262009

People's Community Church

u q e

R d

e t t

t i m

O N

Funds would be used to complete the restoration of a 1908 Carriage House (with addition) located along Downtown Chesaning's mainstreet. Immediately upon completion, the structure would house the offices of the association/foundation and Coach House Renovation and Addition on provide a showcase to promote Michigan products, festivals and events. Within a Pearl Street to establish the Michigan year of completion, a national training center will be established as the MFEA Festivals and Events Association Headquarters, Foundation Offices, Showcase capitalizes on its strength as the largest association of its kind in the United States and becomes the preeminent festivals and events educator nationwide. and National Training Center

Submitted Requests - Not Approved

Route (Infrastructure Only)

357 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Michigan Historic Preservation Network Nancy Finegood, Executive Director, 107 E. Grand River, Lansing MI 48906

Project Name

Project Description

Start Date

Meadow Brook Hall Preservation and Conservation Project

Funds would be used to preserve the building systems and collections at Meadow Brook Hall within the guidelines of the Secretary of the Interior's Standard for Rehabililtation of Historic Buildings. Work would include repairs and restoration of mechanical, electrical and plumbing systems, roofing, window,timber repairs, code upgrades, kitchen upgrades, conservation of collections.

Detroit

Bell Building

NSO is acquiring the historic 253,000 square foot Bell Building located at 882 Oakman Blvd. in the City of Detroit for the following: 1. NSO Administrative and Service Headquarters – the Bell site will serve NSO well both from functional and mission standpoints. The first floor and part of the second floor of the building will be used for this commercial purpose and owned by a separate entity due to the use of New Market Tax Credits for financing. 2. Supportive Housing – the presence of NSO offices will provide a strong anchor for providing 150 one bedroom units of permanent supportive housing in the rest of the building for individuals who have been homeless. NSO will also be working to partner with other organizations to provide on-site primary healthcare and vocational training. In fact, one of the key factors in the selection of this site was due to its proximity to Focus: HOPE and the employment, education and training programs it offers just a few blocks away. Financing for the supportive housing component will be provided through Low Income Housing Tax Credits, HOME funds, Brownfield Credits, Historic Credits and other financing such as AHP. The hous9/1/2009

Michigan Historic Preservation Organnization

Detroit

The Broderick Tower Re-development Project consists of the comprehensive renovation and build-out of the 34 story David Broderick Tower Building overlooking Grand Circus Park in downtown Detroit. This historic building is located in the heart of the Detroit Sports / Entertainment District - and with the David Whitney Building across the street - forms the north gateway into downtown. The building, vacant since the mid 1980’s, will be converted into 127 apartments above 11,000sf of retail / restaurant space at street level and 12,000sf of Class A office space. The project, designed by Kraemer Design Group, is being developed by MOTOWN CONSTRUCTION PARTNERS LP and constructed by JC Beal Construction Inc. The project is ready to start, with design and engineering work completed, tax credits approved, trade contractors selected, and financing in final negotiations with Bank of The Broderick Tower Re-development Project America.

Michigan Historic Preservation Organnization

Wyandotte

Masonic Temple

Michigan Historic Preservation Organnization

Rochester,Michigan Oakland County

T O

d e t

m b u

S Statewide

02262009

t s e

qu

itt

Michigan Library Association

Upon enactment

Reference USA Statewide Business Intelligence through Michigan eLibrary

Within 2 years from the enactment of the Economic Stimulus Package $

O R

D VE

3/1/2011

immediately upon resolution of small funding gap (relative to project size) 12/31/2010

Reference USA business intelligence resource purchase for the Michigan eLibrary wi provide necessary business intelligence for new and growth stage small businesses and jobseekers. Small businesses are the driving force for new jobs in the economy-60 to 80 percent of net new jobs created since the mid-1990’s have been created by small businesses. Most small businesses are hampered by a lack of actionable market data. This constraint to their growth disproportionately impacts rural businesses, since they do not have ready access to metropolitan library business centers or large research institutions. Michigan unemployment figures are currently at 10.6%. Jobseekers require extensive company information to craft an effective job search strategy. ReferenceUSA provides information on 10.5 million businesses across the United States, with result sets which can be customized by geographic area and company characteristics. Currently only about 63 of the Michigan public libraries and library systems out of over 360 possess this tool. By purchasing ReferenceUSA for the Michigan eLibrary, the state would be the first in the nation to p Immediately

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

958,832

P P A

N s

e R

Expected Completion Date

2 years after start date, renewable

$

44,000,000

$

52,000,000

$

1,800,000

$

4,265,700

358 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Michigan Maritime Museum Michigan Maritime Museum Michigan Maritime Museum Michigan Maritime Museum Michigan Maritime Museum Michigan Maritime Museum

Museum Campus City of South Haven Museum Campus City of South Haven Museum Campus City of South Haven Museum Campus City of South Haven Museum Campus City of South Haven Museum Campus City of South Haven

Michigan Maritime Museum Michigan Maritime Museum

Museum Campus City of South Haven Museum Campus City of South Haven

Michigan Maritime Museum

Museum Campus City of South Haven

Michigan Maritime Museum Michigan Maritime Museum Michigan Maritime Museum

Museum Campus City of South Haven Museum Campus City of South Haven Museum Campus City of South Haven

Project Name

Project Description

Start Date

Expected Completion Date

Museum is a top attraction in one of the poorest counties in Michigan. Museum store would replace lost major donor revenue of recent years and help secure survival of 120 days from the museum. award date

180 days from start date

Project 1. Museum Theatre

An early 19th century commercial fishing tug has been partially restored and is part of the museum campus exhibit, but the tug requires a supporting base and roof shelter 90 days from to protect it from the elements award date Storage and exhibit building that can house 16 historic small water crafts currently in 90 days from the collection. Presently not displayed because of space. award date A small adjoining conference facility to attract and produce revenue from small groups 90 days from interested in training, education and team building award date An audio visual or mini theatre annex to existing mall exhibit hall to provide 90 days from continuous, short educational videos of Michigan Maritime History award date

90 days from start date 90 days from start date 90 days from start date 90 days from start date

Project 6. Canister Raft for Historic Ship

The historic replica of the ship, Friends Good Will, needs a canister raft to replace bulky existing life rafts. A canister raft would allow more room for passengers thus increasing revenue.

Project 7. Destination Billboard Display Project 11. Michigan Maritime Museum Educational Film

Three billboards highlighting the historic ship Friends Good Will to market the community and museum. The use of highway billboards has long been considered the best means to advertise the Museum and the educational experience it offers its visitors. Custom-made educational film relating Michigan Maritime History to orient visitors to 30 days from the museum award date

Project 12. Education sails on historic ship

Continue and expand education sails to elementary school children. The current 38 yearly sails are always sold out and operate at a loss of $451 per sail (cost: $766 charge: $315). Add 50% more sails, plus a second captain.

Project 5. Museum Store Project 4. Historic Fish Tug Protective Enclosure Project 3. Historic Small Boat Display Building Project 2. Museum Training & Conference Center

Project 8. Education Director Position Project 10. Ship's Captain Position Project 9. Development Director Position

PP

30 days from award date

A T

O R

Funding Request

$

D VE

60 days from award date

615,000

$

28,000

$

30,000

$

50,000

$

60,000

$

3,500

$

15,000

90 days from award date

$

22,000

30 days from award date

60 days from award date

$

25,000

To continue to educate more than 1,000 school children a year, salary and benefits for full time education coordinator needed to enhance the education mission integral to30 days from the Museum's mission award date Salary and benefits for full time Ship's Captain to sail and maintain the historic ship 30 days from Friends Good Will and conduct educational sails/events award date Salary and benefits for full time development director needed to secure the long term 30 days from financial health of the Museum and its education mission award date

90 days from award date 90 days from award date 90 days from award date

$

105,000

$

165,000

$

275,000

e u

st

eq

s

O N

Route (Infrastructure Only)

R d

Michigan Milk Ovid and Ovid Twp. Producers Association Michigan

i m

b u S 02262009

e t tt

MMPA is considering expanding their operations in Ovid by constructing a new dry milk power facility. This will result in increase truck traffic in the commuity. To solve the truck traffic problem the village in coopweration with the county road commission would like to improve Front Street to handle these trucks on a daily basis. Right now trucks are prohibited from using Front Street. The township is agreeable to having the road improved to all season status. MMPA willinvest approximately $25 million and create 5 new permanent full time jobs. This will result in many moreindirect jobs on the surrounding farms. Ovid is fast becoming a major dairy processing facility. 6/1/2009

Submitted Requests - Not Approved

359 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Opera Theatre

Michigan Opera Theatre

Michigan Opera Theatre

Michigan Opera Theatre

Project Name

Start Date

Detroit Opera House - Theater Carpet Replacement

The Detroit Opera House (DOH) includes all the carpet that was originally installed when the theater was opened in 1996. Over 200,000 people attend MOT opera, dance and educational programs at the DOH. Over thirteen years, millions of people have walked on the carpets in the opera house. Carpet in all public spaces will need to be replaced soon for the theater to remain functional and safe. The current carpeting is coming up at all cuts and seals. The carpet backing is dissolving and has the potential to create areas of possible tripping hazards around the facility. Replacing of current carpet will uphold the integrity of the facility along with allowing the facility to remain attractive to potential clients and renters. In recent years, MOT has formed a partnership with Broadway in Detroit to bring large musical productions to the Detroit Opera House. This has created increased wear and tear on the carpet and made the Within 60 days of its replacement very urgent. project approval Sept. 2009

Digital Board Display

Installation of a billboard-sized, 14'x48' electronic digital display board on the roof of the Detroit Opera House. The digital display board will be used to 1) Generate awareness of Michigan Opera Theatre, 2) Promote upcoming events at the Detroit Opera House, 3) Promote other other arts and entertainment events that generate tourism in Detroit, and 4) To generate advertising revenue.

Detroit

Detroit Opera House - Center for Arts and Learning - Sixth Floor Black Box Theater Completion

The Sixth Floor of the Center for Arts and Learning created a dedicated black-box theater, with flexible stage and seating capabilities ideal for small and experimental productions, as well as community outreach performances. Some additional work is needed to complete the project, including: 1) Portable seating risers that can be removed and added as needed, 2) A curtaining system that allows many different stage arrangements, 3) A portable refreshment station.

Detroit

Detroit

Detroit

02262009

PP

$

410,000

Within 45 days of project approval. July, 2009

$

25,000

All guests doing business at the Detroit Opera House, (with the exception of patrons attending a performance) enter the building at the Stage Door entrance. The current layout of the Stage Door Lobby doesn't provide a security barrier between the public and the main elevator of the Detroit Opera House, which serves the administrative office tower. Plans for a complete renovation, restoration, and reconfiguration of the Stage Door Lobby have been developed to implement needed security Within 60 days of Detroit Opera House Main Lobby Renovation enhancements. project approval Sept. 2009

$

62,000

$

85,000

b u S

A T

e u

q e R

Detroit Opera House Façade Repair - Stage House

st

s

O N

Within 120 days of project approval

6/9/2009

When the Detroit Opera House was opened in 1996, the Stage House was completely new construction, which was designed to meet the specifications of producing opera and dance of world-class standards. The opening of the Detroit Opera House served as the spark for urban revitalization surrounding the Grand Circus Park, and is now the centerpiece of a thriving arts and entertainment district of downtown Detroit. Thirteen years later, the Stage House needs façade repair on all of its elevations. The work is detailed as follows: 1) Remove and replace sealant at all vertical and horizontal joints. 2) Repair all damaged dryvit along upper elevation and loading dock. 3) Apply two coats of elastomeric paint to all elevations and underside of ceiling at 30 days following loading dock. 4) Clean steel fence and gates, prime and apply coating. approval Aug. 2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 350,000

t i m

Detroit

O R

Funding Request

$

d e tt

Michigan Opera Theatre

Project Description

Expected Completion Date

360 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Opera Theatre

Detroit

Project Name

Project Description

Start Date

Expected Completion Date

Detroit Opera House - Center for Arts and Learning - Fourth Floor Media Studio Completion

An important part of MOT’s mission is to make its work accessible to all segments of the population in a variety of ways. MOT's award-winning Department of Community Programs has developed many educational and outreach programs to help underserved and disadvantaged individuals, especially youth, have access to its work When MOT opened the DOH in 1996, one office tower, surrounding the theater, was renovated to become offices for staff. The opposite office tower was dedicated to educational and community programs and was renovated in 2006. The Fourth Floor of the Center for Arts and Learning was designed to be a media center, allowing MOT to record its opera, dance and educational programs and share them with remote students. The physical space was completed, but the budget did not include equipment. After exploring the state of the art processes involved in distance learning, MOT created an online course in Visual, Performing and Applied Arts in partnership with Michigan Virtual University that high school students in Michigan can take for credit towards graduation requirements. A media company was hired as a consultant t

Detroit Opera House Parking Center - Retail Center Build Out - Lease Ready

When the Detroit Opera House opened in 1996, it was located in an area of downtown that had deteriorated and did not have a lot of traffic. Shortly thereafter, the Detroit Tigers and Detroit Lions announced plans to build new stadiums within a few blocks o the opera house. The MOT Board of Directors decided that its opera and dance patrons (many elderly) would need dedicated parking to continue their attendance at MOT productions. MOT originally purchased and then built its own parking structure to serve its patrons and to provide parking revenue related to the new sports stadiums and other new businesses. When the DOH Parking Center was opened in 2005, retail space was created that was available for rent. The second floor of the retail space (10,000 square feet) was leased by a design firm, resulting in revenue for MOT and new jobs for Detroit. The lower 10,000 square feet of the Retail Center remains available. It must be renovated to be made ready for tenant occupancy. The following work needs to be done at minimum: 1) Pour a concrete floor including drain lines, 2) Within 60 days of Pull electrical service, 3) Completion of two restrooms with plumbing. A potential tena project approval Sept. 2009

T O

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE $

215,000

$

359,000

$

505,000

N s

Michigan Opera Theatre

Detroit

d e tt

Michigan Opera Theatre

Detroit

02262009

t i m

S

ub

Detroit Opera House Façade Restoration East Elevation

t s e

qu

e R

The Detroit Opera House was originally built in 1922 as an urban movie palace called the Capitol Theater. Designed by renowned architect, C. Howard Crane, the theater was constructed with superb acoustics and in the style of the grand European opera houses. The building operated as a movie theater through the 1960s, when it began to deteriorate, continued in the 1970s, when it began to be closed intermittently, until it finally closed for good as a movie palace in 1985. Michigan Opera Theatre purchased the abandoned facility, which had undergone serious damage, in 1989, and began to renovate the building to create its permanent home, the Detroit Opera House. Two buildings adjacent to the opera house to the east and to the west were demolished in the renovation. The east side of the Detroit Opera House is now an exposed brick façade, which was never meant to be an outside wall. The east façade was never restored when the Detroit Opera House was opened in 1996. The entire wall needs to be completely replaced. Work would consist of a construction of a wall consisting of Within 45 days of new ceramic block veneer bricks that would be tied into the existing brick structure. Thproject approval. July, 2009

Submitted Requests - Not Approved

361 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan State University

Michigan State University Center for Latin American & Caribbean Studies

Michigan State University Center for Latin American & Caribbean Studies

Michigan State University Center for Latin American & Caribbean Studies

state of Michigan

East Lansing, MI

East Lansing, MI

East Lansing, MI

Project Name

Art, Culture & the Innovative Workforce

Contemporary Global Issues: Preparing Teachers to Meet the Michigan World History/Geography & Global Studies Expectations:

Expand exisiting Global/International Curricular Collection to include resources to support teaching MI World History/Geography Content Expectations. Develop integrated curriculum guide (hard copy & web-based) to accompany collection to address the MI Contemporary Global Issues strand. This guide will incorporate regional, interegional, and global perspectives as they relate to U.S. and Latin America. This content will be dissemintated statewide.

Internationalizing the Curriculum: Building Teacher Capacity

Provide professional development in-service training to K-12 teachers in the arts & humanities, foreign languages, and social sciences for the purpose of internationalizing their classrooms. Content and themes will focus on Latin America and the Caribbean and connect to the MI Content Expectations. This program will build on our successful model of summer institutes by creating a year-long professional development program (offered for SBCEU credits). Target audience is teachers in the social sciences and foreign languages.

Building Partnerships & Sharing Best Practices: Latin American School and Education Resources

T O

e t tt

b u S

P P A

O R 6/30/2010

3/1/2009

3/1/2010

3/1/2009

3/1/2010

Integrate new technologies into the award-winning website Latin American School and Education Resources to create accessible digital media content to internationalize K12 curriculum. Innovative web-based modules and learning objects will build on existing database of teacher-developed lessons. These technologies will facilitate networking and build parterships between Michigan and Latin America. 3/1/2009

3/1/2010

The Michigan Quilts! project would be a multi-faceted collaboration of the Michigan Office of Cultural Economic Development, Michigan State University Museum, Michigan Museums Association, regional arts councils, rural Michigan communities, individual artists, and quilt-related small business owners. The project would provide $1 million for: 1) Direct grants to Michigan museums to hire photographers and cultural heritage workers to inventory, catalogue and photograph quilt collections, digitize text and image data, and upload data into the national Quilt Index (www.quiltindex.org); 2) Direct grants to regional arts councils to hire photographers, writers, and cultural heritage workers to inventory, photograph, and write descriptions of quilt-related industries; 3) Build marketing linkages of quilt-based industries with cultural economic development and tourism through the online CraftWORKS! Michigan Marketplace, Travel Michigan and Travel North web sites; 4) Create eight mini “Festivals of Michigan Quilts” one each in Monroe, St. Johns, Plainwell, Niles, Manistee, the western UP, the Saginaw/Thumb region, and the Mackinaw straits that wApr 1 09

9/30/2010

N s

t s e

u q e

R d

Base location for statewide coordination is East Lansing; majority of work will be done by paid individuals contracted by museums and regional arts councils around the state. Special events to be held in one each in Monroe, St. Johns, Plainwell, Niles, Ma Michigan Quilts!

02262009

Start Date

We propose to carry out such a study on a group of Michigan innovators and to interview some of these innovators to determine specifically how arts and crafts avocations may have had an impact on their professional work. Such a study could provide a novel basis for promoting art education, community arts programs, and art institutions at a time when all of these are at risk. More particularly, it may provide a basis for arguing the utility of the arts both practically and economically. We therefore see this study as the first stage in a three-part project in which we will, assuming the results warrant it, later develop a) specific funding and educational policy recommendations for promoting arts education and linking it to the training of innovators, and b) pilot projects to implement some of those educational recommendations through collaborators at Michigan State University and local schools. 4/1/2009

i m

Michigan State University Museum

Project Description

Expected Completion Date

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

D VE $

70,171

$

1,250,000

362 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan State University Museum

Project Name

Project Description

Start Date

Expected Completion Date

E. Lansing with statewide impact focused in rural & remote communities Rural Arts Community Incentive Program

MSU Museum/Extension rural arts community incentive program will strenngthen artist entrepreneurs and local or regional resources devoted to cultural community and economic development. Three arms of grant or contract funding would be awarded on a competitive basis. Successful applicants would have a demonstrated record and contribute a 25% match (combined cash and in-kind) of awarded funds demonstrating commitment and direct investment. Accomplishment of proposed activities would be required prior to commplete funding award. A) Ten artist entrepreneur and small business success awards of $10,000 would support marketing, technology, roduct development = $100,000. B) Ten-plus community/regional artist incubators and collaborative awards of $10,000-$20,000 would be available to established organizations for collaborative regional marketing, sales venues, professional development and other income producing service functions = $200,000; C) Eight capitol/green building awards of $100000 for adaptation, rehabilitation, and restoration of existing facilities being transformed into local or regional cultural/entertainment facil 4/9/2009

Detroit

Model Energy Efficient School Building -- Major renovation of existing 41,000 square feet, 40+ year old concrete block school building to bring building to USGBA LEED-for Schools Platinum Standards (in excess of 58 points, version 1). Project intention is to be highest LEED rated school building renovation in the nation. Renovation to include replacement of existing windows with energy efficient windows, teardown and installation of 80% vegetated roof, removal of 40+ year old boiler sy+K4stem with high efficiency geothermal HVAC system meeting AHSRAE comfort requirements, installation of onsite biodiesel electric generator incorporated in school system to provide electric power (school makes large volume of biodiesel from used vegetable oil); R-30 exterior walls; retention of storm water for urban agriculture program; waterreducing fixtures; CFC-free and energy efficient applicances; water efficient landscaping; natural light and ventilation; bicycle-friendly site design; low light-pollution exterior lights; energy-efficient flourescent lighting; modern fire suppression and safety systems. As possible all-American products & materials. 6/15/2008

T O

P P A

O R 9/10/2009

Funding Request

Route (Infrastructure Only)

D VE $

1,586,120

$

6,000,000

$

10,900,000

N s

Michigan Technical Academy

Michigan Technical Academy K-8 Building

d e tt

Michigan Technical Academy

Detroit

02262009

t i m

S

ub

Michigan Technical Academy K-8 Building

t s e

qu

e R

Model New Construction of 60,000 square feet school building addition in line with USGBA LEED-for-Schools Platinum Standards (in excess of 58 points, version 1). Building to be on site of and connected to above-described renovated building. Building to include latest advanced electronic technology within each classroom, including SmartBoards, low-power thin client computers and mini-laptops, video conferencing capabilities within each classroom. Project intention is to be the highest LEED rated school with new construction. Building to feature R30 exterior walls, 80% vegetated roof, natural light with low-e glass throughout, non-VOC paint, renewable and recycled materials, including flooring, and furnishings. Building to have 36 classrooms, electronic/traditional library, health center/gymnasium/community center open all evenings and weekends for community events, training, tutoring, children's activities, computer access and neighborhood meetings. The facility will serve as an authentic "hub" in depressed northwest Detroit. 8/15/2008

Submitted Requests - Not Approved

8/15/2010

363 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan Technical Academy

Project Name

Project Description

Start Date

Teardown and replacement of 30,000 sq. ft. roof on high school building. Roof is failing in several areas and represents the building's greatest source or heat loss; current roof insulated with 1.5" - 2.5" rigid foam insulation; replacement product to have R-value of 35, exceeding recent ASHRAE model commercial building standards (R-25). Construction of biodiesel research and production facility operated by high school staff, students and private sector to improve school's already good production (100 gallons of biodiesel weekly from used vegetable oil) to include alternative sources including biomass to liquid (BTL); replace existing manufacturing system with components designed for production system, including larger reaction and storage tanks, fuel testing lab, fuel delivery vehicle, 6/15/2008

Township of Redford

Michigan Technical Academy High School Building

Ann Arbor

Renovation, restoration and energy efficient retrofitting of all public areas of the historic theater to ensure effective operation, energy conservation and public safety, to preserve the historic characteristics of the theater, and to maintain the theater's 80 year history as a downtown landmark and vital economic resource in our community. This includes general "green" lighting improvements to provide a more energy efficien operation, the replacement of worn out seats, restoration of historic paint and plaster Historic Theater Auditorium & Public Area treatments, historic chandelier restoration, energy saving improvements to the exterior Renovation, Restoration and Energy Efficient marquee, improvements to public restrooms including water conserving technologies, Retrofitting fire safety upgrades, and carpet replacement. 5/1/2009

Michigan Theater Foundation

Ann Arbor

Historic Theater Stage & Production Infrastructure Renovation & Improvement

Michigan Trails and Greenways Alliance

Acme

TART Trail

Michigan Trails and Greenways Alliance

Dexter

Border to Border Trail

Michigan Trails and Greenways Alliance

Garfield Twp.

West Boardman Lake Trail

Michigan Trails and Greenways Alliance

Meridian Township

Michigan Trails and Greenways Alliance

Middleville

Michigan Theater Foundation

12/1/2009

$

2,000,000

A key aspect of this project will be "green" improvement to this historic structure. The safety and functioning of the stage, production, and technical areas of our historic theater will be improved to ensure productions are of the highest quality, enhance the operating efficiency of our facility, and maintain the theater's 80 year history as a downtown landmark and vital economic resource in our community. This project includes the counterweight mechanical stage system, orchestra pit lift, audio system improvements, lighting system repairs, and dressing room renovations. 6/1/2009

8/1/2010

$

3,000,000

Asphalt Pave 1.5 mile gap in rail-trail between Bunker Hill and Lautner Rds.

10/30/2009

s t s

P P A

-N

e u

q e R

9/1/2009

Route (Infrastructure Only)

D VE 325,000

Bunker Hill Lautner Rds.

3-mile combination of boardwalk, asphalt pavement, and nonmotorized bridge facility over Mill Creek to continue cross-county trail system 9/1/2009

3/1/2010

$

Main St. to HCMA 1,300,000 Hudson Mills Park

Asphalt Pave final 2 mile segment of a 5-mile trail around Boardman Lake on publicly owned land 9/1/2009

10/30/2009

$

10th St. - S. Airport 2,500,000 Rd.

Smith Drain Trail - 2

Asphalt Pave .85 mile of drainage corridor to extend trail north to Sower Rd.

9/1/2009

10/30/2009

$

Existing trail to 330,000 Sower Rd.

Paul Henry Thornapple Trail

Asphalt Pave 1.1 mile segment of rail-trail to extend trail northward towards Kent County where trail is completed - (not a direct connection yet)

9/1/2009

10/30/2009

$

East Main to Crane 185,000 Rd.

tt i m

b u S

Michigan Trails and Greenways Alliance

Wayland - Wayland Twp. Wayland Interurban Trail

Asphalt Pave rail-trail 6 miles from Dahlia (Wayland) to 124th St. (Shelbyville in Wayland Twp.) This is a critical north-south connection between Kent County and the Kalamazoo regional trails network.

Michigan Trails and Greenways Alliance

Elmwood Twp. - Bingham Twp. Leelanau Trail

Asphalt Pave 7 miles of rail-trail, Lakeview Rd. to Revold Rd.

02262009

O R

Funding Request

$

T O

d e t

Expected Completion Date

Submitted Requests - Not Approved

5/1/2009

6/1/2009

$

1,550,000 Dahlia to 124th St.

$

Lakeview Rd. to 1,600,000 Revold Rd.

364 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Michigan Trails and Greenways Alliance

Kalamazoo

Kalamazoo River Valley Trail - Segment 3

Construct 1.7 mile ashphalt paved east extension to the Kalamazoo River Valley Trailway from Mayor's Riverfront Park in the City to Sprinkle Rd. at the Kalamazoo River

Michigan Trails and Greenways Alliance

Kalamazoo

Kalamazoo River Valley Trail - Segment 2

Construct 5 mile asphalt paved north extension to the Kalamazoo River Valley Trailway along the Kalamazoo River

Michigan Trails and Greenways Alliance

Meridian Township

Smith Drain Trail - 1

Asphalt Pave .5 mile of drainage corridor to directly connect to existing Meridian OffRoad trail 5/1/2009

Michigan Trails and Greenways Alliance

Meridian Township

Interurban Pathway

Asphalt Pave 1.1 mile segment of interurban rail corridor to extend existing trail east across the twp.

5/30/2009

10/1/2009

5/30/2009

10/1/2009

5/1/2009

Negaunee

Iron Ore Heritage Trail

Acquire railroad corridor and pave 3.5 miles with crushed limestone and asphalt pave a 1 mile segment (through City of Negaunee) of the Iron Ore Heritage Trail from Negaunee Senior Center to the Michigan Iron Ore Industry Museum 7/1/2009

Michigan Trails and Greenways Alliance

Pontiac

Clinton River Trail

Construct a bicycle/pedestrian bridge over Telegraph Rd. to mitigate high-traffic crossing on rail-trail

Clinton River Trail

Construct a bike/pedestrian safety island on Orchard Lake Rd. and make trail alignment perpendicular to road to provide continuity and a safe crossing between West Bloomfield Trail and Clinton River trail

Michigan Trails and Greenways Alliance

Sylvan Lake

Traverse City

N s

Safe Routes to School Connections

Michigan Trails and Greenways Alliance

Traverse City

Michigan Trails and Greenways Alliance

Williamsburg - Whitewater Twp. TART Trail

Middle Michigan Development Corporation

Harrison, MI

02262009

T O

d e t

Safe Routes to School Connections

b u S

tt i m

Harrison Industrial Park

6/1/2009

Funding Request

$

Route (Infrastructure Only)

1,254,633

D VE $

Mosel Ave. to D 1,766,125 Ave.

$

Jolly Oak Rd. to 110,000 existing trail

6/1/2009

$

Okemos to Marsh 330,000 Rds.

9/1/2009

$

310,000

6/1/2009

O R

P P A

Michigan Trails and Greenways Alliance

Michigan Trails and Greenways Alliance

Expected Completion Date

$

7/1/2009

Telegraph Rd. 1,200,000 Crossing

$

Orchard Lake Rd. 150,000 Crossing

Develop new 10' asphalt trail connection from school property along Silver Lake Rd., new paved shoulder along Wyatt and new 10' asphalt trail connection 7/1/2009

9/1/2009

$

Along Silver Lake Rd. from Barnes to Wyatt, and along Wyatt to Zimmerman and along Zimmerman from Heritage to 262,377 Buckhorn

Make necessary ADA improvements to 2600 feet of existing asphalt pathway and develop a total of 2100 feet of new trail consisting of 3 new asphalt trail connections on West Middle School property to link into TART Trails nonmotorized trail network to enable use by students to get to school; Also develop designated bus drop and corresponding new concrete pathway to school 7/1/2009

9/1/2009

$

on West Middle 404,269 School property

Asphalt Pave rail-trail 2 miles from M-72 (Williamsburg) to Elk Lake Rd.(Whitewater Twp.)

7/1/2009

8/1/2009

Construction of a 40+ acre industial park to be served by all amenities including sewer, water, electric, roads and fiber optic

April, 2009

10/9/2009

t s e

qu

e R

Submitted Requests - Not Approved

M-72 to Elk Lake Rd.

$

500,000 BR127

365 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Install set of energy efficient sliding exterior glass doors ($10,400.00) in Garden Room (banquet facility) to connect facility to adjacent botanical garden. The doors would allow easier access to the outdoors and facilitate audiences ability to reach the area for outdoor concerts and events. Replace one boiler ($128,000.00), replace two chillers ($435,000.00), and upgrade electrical service ($262,000.00) to accommodate the new boiler and chillers. Current boilers and chillers are original equipment installed prior to building opening in 1970. The new boiler and chillers will be much more energy efficient and will have a relatively swift pay-back period. Also replace Alpine gas kiln which is used in the museum's ceramic department/studio school program. Current kiln is over 40 years old and is not operating properly or efficiently. A new kiln will be much more energy efficient. 4/15/2009

Midland Center for the Arts, Inc. Midland, Michigan

Improve the energy efficiency of building systems

Midland County ESA

The Sugnet School building was built in 1920 with additions in 1938 and1944. Rennovations wqere made in 1966,1970 and 1992. Currently windows are single pane glass wood or aluminum frame. This project would replace all single pane Sugnet School Window Replacement Project windows with energy efficient windows and framing.

Midland County ESA

Midwest Energy Electric Cooperative

Midland

Windover High School Rennovation Expansion

Midland

Berrien County Townships of Bainbridge, Coloma, Pipestone and Watervliet. Cass County Townships of Calvin, Howard, Jefferson, LaGrange, Marcellus, Mason, Milton, Newberg, Ontwa, Penn, Pokagon, Porter, Silver Creek, Volinia and Wayne. Smart Grid For Efficiency Gains to Energy Kalamazoo Count Optimization Benchmarks

T O

P P A

O R

6/1/2009

The Windover Alternative High School is chartered by the ESA. The project is for the addition of six classrooms and rennovations of the exisiting facility which is owned by the ESA and leased by Windover. 10/1/2009

N s

e t tt

b u S

Mattawan Township in Kalamazoo County, Michigan

02262009

Mattawan Fibre Ring

Funding Request

Route (Infrastructure Only)

D VE

8/15/2009

$

870,400

8/1/2009

$

150,000

9/1/2010

$

2,400,000

$

1,125,000

$

81 mile route in and around Mattawan, Michigan (Van 6,635,000 Buren County)

In 2009, utilities in Michigan will be implementing a renewable portfolio standard (RPS and energy optimization programs (EO). Demand Reduction Units (DRU) are devices that can control smart appliances through Advanced Metering Infrastructure (AMI). According to the Demand Response and Advanced Metering Coalition (DRAM), AMI is the communications hardware and software associated system and data management software that creates a network between advanced meters and utility business systems which allows collection and distribution of information to customers and other parties such as competitive retail suppliers, in addition to the utility itself. This can help customers better understand how power is used and ultimately conserved and provide key data to utilities enabling them to provide more efficient delivery of power to members. All this requires further development of the Smart Grid being promoted by President Obama which, in turn, requires broadband Third Quarter interconnection capabilites such as those delineated above. 2009

t s e

u q e

R d

i m

Midwest Energy Electric Cooperative

Expected Completion Date

In response to member calls, a planned significant expansion at MPI Research and continued growth in area population, MWE was asked to explore a fibre to the home project in and around Mattawan, Michigan in 2008. As part of their research, MWE visited with Hiawatha Broadband Communications, Inc. (HBC) in Winona, Minnesota who has been very successful in deploying this technology in rural areas. With their assistance, multiple economic models were analyzed - the best being a three year build-out with 75% penetration of a potential 4,000 initial customers. Even at that scenario, the project was not pursued as projected net income was a negative factor for too many years. Support of this project through federal stimulus money, could help the economic model make sense thus promoting job retention and growth as wel Third Quarter as generating much needed investment in this growth area of the state. 2009

Submitted Requests - Not Approved

Second Quarter 2012

366 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

D VE

Midwest Energy Electric Cooperative

Berrien County Townships of Bainbridge, Coloma, Pipestone and Watervliet. Cass County Townships of Calvin, Howard, Jefferson, LaGrange, Marcellus, Mason, Milton, Newberg, Ontwa, Penn, Pokagon, Porter, Silver Creek, Volinia and Wayne. Kalamazoo Count Rural BPL Deployment

In November 2008, IBM and International Electric Communications, Inc. (IBEC) signed a $9.6 million agreement to have IBM install Broadband over Power Line (BPL networks at electric cooperatives throughout the eastern U.S. Their focus is on providing "last mile" broadband services to underserved residents in rural America. BPL, effectively leverages an existing asset, the power lines, to quickly and inexpensively deploy broadband access. IBM, the first major systems integrator to enter the market, is providing overall project management, oversight and training of local line crews. IBEC will provide the BPL technology and equipment and serve as the Internet Service Provider (ISP) for rural residents. MWE will be installing the technology and is working with our 26,000+ members to gauge interest (significant) and schedule deployment. With the expected increase in home based businesses brought about by a downturn in the local economy (especially recreational vehicles and auto parts suppliers) BPL and other broadband technologies will be an important Fourth Quarter component of retaining residents, jobs and investment in Cass County. First Quarter 2009 2010

Midwest Energy Electric Cooperative

Cass County - Townships of Calvin, Howard, Jefferson, LaGrange, Marcellus, Mason, Milton, Newberg, Ontwa, Penn, Pokagon, Porter, Silver Creek, Volinia and Wayne. Kalamazoo County - Townships of Brady, Oshtemo, Portage, Prairie Ronde, Schoolcraft, Texas a Rural County Fiber Backbone

MWE has been working with the Cass County Intermediate School District (ISD) to offer solutions to an expressed need for broadband connectivity. Though the schools have some T-1 lines and building-to-builidng communication, they are not connected to a larger fibre ring that would allow them to stream video or provide the type of technology needed to prepare students for employment in a global economy. As part of MWE's effort to assist the ISD, they began to explore what is needed to economically deploy a fibre backbone throughout its primary market area that schools governmental entities, businesses and residents could tap into. At present, costs have been identified, but additional work must be undertaken to gauge whether this is Second Quarter an economically vialble project to pursue. 2009

d e tt

Midwest Strategy Group Mills Township Mills Township

t i m

ub

Multiple Mills Township, Ogemaw County Fire hall Expansion Mills Township, Ogemaw County New Library

02262009

S

$

Follows MWE lines throughout Cass County and portions of Berrien, Kalamazoo, St. Joseph, Van Buren and Lenawee County. At full build-out, BPL will traverse 2,844 miles of line that includes small portions of northern 2,992,256 Indiana and Ohio.

First Quarter 2011 $

110 mile route through portions of Cass, Kalamazoo, St. Joseph and Van 2,140,000 Buren Counties.

O R

T O

Funding Request

P P A

N s

t s e

qu

e R

The eradication of all Ash Trees that are currently infested or have died due to infestation from the Invasive Species known as the Emerald Ash Borer Beetle. Removal of these trees on public property, private property and electrical utility Rights of Way would produce an ample supply of Green Energy material in the form of wood and wood chips that could be utilized by the (5) existing Bio-Mass plants currenlty operating in Michigan. The number of jobs this project could create is literally in the thousands as the Tree Service, Logging, Landscape & Biomass industries would receive an incredible boost by the amount of work that needs to be accomplished in order to remove these hazardous trees and turn them into Bio-Fuels. Removal of these dead and diseased trees also rids the State of a Health and Safety risk that results from the potiential falling or snapping of these trees that could result in loss of property and/or life. The Electrical Utililites would also be alleviated from any falling risk that could result in large scale power outages and potential wildfire(s) due to these trees currenlty standing in their rights of way and potentially falling across highly4/1/2009 40' by 60' addition to our existing Fire Hall and a 10,000 gallon fire water storage tank because we don't have fire hydrants June, 2009 The library is currently an extension of the Ogemaw District Library. The proposal is to build a new library to service the residents of the township. June, 2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

4/1/2011

$

500,000,000

Sept., 2009

$

275,000

Nov, 2009

$

400,000

367 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Monroe County Council CIO Social & Welfare Association Monroe Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Montmorency County Road Comm. Moran Township Morey Public School Academy Morley Stanwood Community Schools Morley Stanwood Community Schools Morley Stanwood Community Schools

Morley Stanwood Community Schools Morley Stanwood Community Schools Morley Stanwood Community Schools

Project Name

Project Description

The Philip Murray Building was built in the 1920s. During labor’s heyday it was the active hall for many unions. It was dedicated by Walter Reuther, and several historic events took place there. In 2001, the Association was struggling and had to revaluate the building’s 50-year history and its place in Monroe’s historic downtown. City leaders agreed it would be a great loss for the oldest, continuously run downtown organization to close. Local unions offered substantial support. A plan was developed to convert the building into the only Labor History Museum in Michigan; continue its use as a Living Union Hall for a dozen unions, and as a meeting center and public concert hall. Its objectives were; youth education and outreach programs; sustainable operations; and a realistic funding plan. The Museum became 501c3 in 2002, and its first exhibitions were successfully presented in 2005. The Building and Museum are a significant element in the DDA/Historic District Downtown Revitalization program. It will be LEED Certified. The County Historical Museum, Community College and Intermediate School District have supported the Museum and its restoration, and help 3/1/2009

Monroe Labor History Museum

$

550,000

$

630,000

CR612 reconstruction - S. county line to Meridian Line Rd. (2.2 miles)

$

660,000

CR487 reconstruction - CR 489 to landfill entrance (4,5 miles)

$

990,000

$

1,600,000

Pleasant Valley Rd. resurfacing - M-32 to M-32 Bus. (10.5 miles)

$

2,100,000

CR624 reconstruction - M033 to CR459 (12.0 miles)

$

2,400,000

Farrier Rd. reconstruction - Turtle Lake Rd. to M-32 (11.0 miles)

$

2,970,000

$

4,140,000

7/1/2010

$

275,000

8/1/2009

$

150,000

$

617,000

$

772,000

$

9,405,000

$

15,325,000

$

97,000

$

8,872,000

O N

st

s

CR451 resurfacing - M-32 to N. county line (8.0 miles)

e u

eq

R d

Morley Stanwood Community Schools

CR622 reconstruction - Meridian Line Rd. to M-33 (13.8 miles) Water line extension along Pte. LeBarbe Road to alleviate historical water quality problems 7/1/2009 To enhance technology with wireless broadband connectivity, two modern computer labs, and classroom smart boards. Construct an addition to Morely Stanwood High School to accommodate industrial arts and technology. Construct a new Alternative Education Facility to include geothermal mechanical system and a green roof.

Morley Stanwood Community Schools

Upgrade Morely Elementary to include building infrastructure,energy effeciency, technology infrastructure and equipment, safety and security, barrier free and geothermal mechanical system for entire facility.

Morey Public School Academy

Morley

Morley Stanwood Community Schools

e t t

it

m b u

Morley

Morley

02262009

500,000

Meridian Line Rd. reconstruction - M-32 to Briley Rd. (2.1 miles)

Shepherd

Stanwood

$

A T

12/31/2010

S

Morley Stanwood Community Schools

Upgrade Morely Stanwood Middle School to include building infrastructure,energy effeciency, technology infrastructure and equipment, safety and security, barrier free and geothermal mechanical system for entire facility. Construct an enclosed canopy over school buses to protect from winter conditions and extend the life of school buses 7/9/2009

Morley Stanwood Community Schools

Upgrade Stanwood Elementary to include building infrastructure,energy effeciency, technology infrastructure and equipment, safety and security, barrier free and geothermal mechanical system for entire facility.

Morley Stanwood Community Schools

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 1,000,000

CR489 resurfacing - S. county line to CR612 (2.2 miles)

Pte. LaBarbe Water Extension

Morley

PP

O R

Funding Request

$

Meridian Line Rd. resurfacing - Old State Rd. to M-32 (2.1 miles)

Moran Twp.

Morley

Start Date

Expected Completion Date

368 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Mosaic Youth Arts Center Motor City Youth Theatre Mott Community College Mott Community College

Mott Community College

Mott Community College

Mott Community College

Mott Community College

Mott Community College

Mott Community College

Mott Community College

Project Name

Project Description

Start Date

Mosaic Youth Theatre of Detroit will renovate an historic building at Second Avenue and Bethune -- formerly the home of WJBK and WTVS -- to become a multi-use facility for award-winning youth development programming. The Mosaic Youth Arts Center will provide accessible arts and employability training to more than 1,000 Detroit area youth annually, the majority being economically-disadvantaged. In addition to arts and employability training, Mosaic provides college-preparation. In Mosaic's 16 year history, 95% of its members have graduated from high school and entered college. The renovation of the building will incorporate cutting-edge Green Technology, including geothermal energy, to make the building sustainable and environmentally efficient. The Mosaic Arts Center will include a black box performance space, rehearsal rooms, a choir room, a design room, a resource library and office space for Mosaic and other youth and arts organizations. Through its central location the Mosaic Youth Arts Center will be accessible to youth from throughout metro Detroit, while focusing specific programs on the youth of the econom4/1/2009

Mosaic Youth Arts Center

Livonia

Handicapped accessible ramp

Flint

Pappas Conference Center Renovation

To build a ramp for access into the theatre by wheelchairs. March, 2009 Renovaiton to convert garage to conference room and convert kitchen and entry foyer to new kitchen and ADA accessible toilets. 7/9/2009

Longway Boulevard Landscaping

Reconstruction of landscaping, retaining walls, etc. along the Longway Boulevard frontage of the college; extensive use of native plant species is proposed; Phase IV of the college's master land use plan. 7/9/2009

Court Street Landscaping

Enhancement of landscaping, etc. along the Court Street frontage of the college; a manicured look consistent with adjacent neighborhoods is proposed along with use of native plant species; Phase V of the college's master land use plan. 7/9/2009

Flint

Longway Boulevard Parking

Construction of additional 500 parking spaces adjacent to Horrigan Drive at Longway Boulevard; use of permeable asphalt and current "green" construction technologies is proposed; Phase III of the college's master land use plan. 7/9/2009

Flint

Mott Boulevard & Gorman Drive Renovation: Mott Boulevard from Court Street to Gorman Realignment of Gorman Drive along with reduction and reconstruction of adjacent Drive (private) & Court Street to Horrigan parking lots; use of permeable asphalt and current "green" construction technologies Drive (private) is proposed; Phase VII of the college's master land use plan. 7/9/2009

Flint

d e tt

T O

s t s

-N

e u

q e R

O R

P P A

Detroit

Flint

Expected Completion Date

Funding Request

D VE

7/1/2010

$

6,000,000

March, 2009

$

17,000

9/9/2009

$

250,000

11/9/2009

$

1,500,000

11/9/2009

$

2,200,000

11/9/2009

$

2,500,000

12/10/2009

$

3,000,000

Flint

Horrigan Drive Renovation: Longway Boulevard to Court Street (private)

Widening, narrowing and realignment of Horrigan Drive to promote traffic and pedestrian safety, improve access and egress from the campus and improve the campus environment; use of permeable pavement is proposed along with other current "green" construction technologies; Phase II of the college master land use plan.

7/9/2009

11/9/2009

$

3,500,000

Flint

Wagner Workforce Development Center Addition

Addition necessary for increased workforce development traffic generated by "No Worker Left Behind" and similar programs; includes 4 classrooms, 2 shop-type labs, redesigned entrance including skywalk across Saginaw Street to parking. 7/9/2009

1/10/2009

$

3,855,000

Campus Core Parking / Landscaping

Reduction and reconstruction of parking in the campus core along with restoration of landscaping, retaining walls, etc.; use of permeable asphalt and current "green" construction technologies is proposed; a manicured landscape look consistent with campus "quadrangle" spaces is proposed along with use of native plant species; Phase VIII of the college's master land use plan. 7/9/2009

12/11/2009

$

5,500,000

Northern Tier Center Classroom Fitup

Fitup of existing "core-and-shell" space adjacent to current facility into classrooms and other spaces to create a Clio Area Health, College and Community Center; "Healthy Community" outreach to local jobless, dislocated workers, elderly, disadvantaged persons. 7/9/2009

9/9/2009

$

378,125

Flint

b u S

Vienna Township, Genesee County

02262009

t i m

Submitted Requests - Not Approved

Route (Infrastructure Only)

369 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Mott Community College Mott Community College Mott Community College Mott Community College Mott Community College Mott Community College Mott Community College Mott Community College Mott Community College Mott Community College

Project Name

Project Description

Start Date

Renovations to accommodate operations and program changes required to accommodate Continuing Education and Corporate Training Services in addition to Southern Lakes Branch Center Rehabilitation current programs.

Fenton Township, Genesee County

4/9/2009

8/9/2009

6/9/2009

Flint

Renovation of portion of SLBC to accommodate Phase I and Phase II of the IMS, a Relocation of Institute for Medical Simulation program that trains healthcare professionals in new techniques and procedures using to Southern Lakes Branch Center simulated human patients 4/9/2009 West Wing elevator and HVAC systems replacement; finishes and doors Mott Memorial Building West Wing Renovation replacement. 6/9/2009

Flint

Mott Memorial Building Television Education Studios

Conversion of old public broadcasting facility in basement of Mott Memorial Building to modern TV and film production studio for audio-visual teaching programs 6/9/2009

Flint

Gilkey Creek Restoration

Habitat restoration of approximately 1,350' of Gilkey Creek and adjacent riparian land. 6/9/2009

Mott Library Renovation

Renovation of Third Floor; Replacement of exterior window systems and repair of masonry systems; HVAC improvements; Toilet, elevator and other system improvements.

Fenton Township, Genesee County

Flint

$

1,373,500

11/9/2009

$

1,500,000

3/10/2009

$

8,156,000

8/9/2009

$

400,000

7/9/2009

$

750,000

8/9/2009

$

250,000

8/11/2009

$

6,295,000

September, 2010

$

75,034

7/10/2009

$

2,500,000

Connection of 12-inch watermain between existing watermain on Coldwater Road and Carpenter Road, for looping fire flow protection - Jennings Road. 3/9/2009

11/10/2009

$

700,000

Install 700 feet of new 8-inch water main from the end of Hidden Road to Lupine Drive. Which will loop the water system to improve water quality and fire flows.

5/1/2009

8/1/2009

$

58,800

Install storm water collection tile in the northwestern streets in Fletcher’s Subdivision 5/1/2009

8/1/2009

$

160,700

Win-Kae Place Road Reconstruction Fletcher Subdivision Drainage Improvement Phase II

Remove approximately 900 feet and a width of 31 feet from back-of-curb to back-ofcurb of existing concrete pavement and subbase and replaced with a new bituminous pavement section consisting of 12 inches of sand subbase, 6 inches of aggregate base, and 3 inches of bituminous pavement. With minor curb and gutter replacement, and approximately 280 lineal feet of the existing storm sewer improvement. 5/1/2009

8/1/2009

$

177,000

Install storm water collection tile in the remaining streets in Fletcher’s Subdivision

5/1/2009

8/1/2009

$

265,000

Gary and Erie St. Water Main Improvement

Extending 450 feet of new 12-inch PVC water main from the existing Bay County Civic Area, located on Shrestha Drive, eastward across the Huron and Eastern Railroad and along the existing Gary Street right-of-way to the intersection of Gary and Chilson Streets. Additional 1,500 feet of 8-inch PVC water main will be installed along Gary and Erie Streets. 5/1/2009

8/1/2009

$

284,000

Repairs necessary to bring CTCs to condition of other campus facilities; renovations of lab spaces at Wagner to accommodate new "No Worker Left Behind" and other workforce development programs. 6/9/2009 Consolidation of informational and educational technology departments into one central location at Curtice-Mott Complex 4/9/2009

T O

Curtice-Mott ITS Consolidation

Flint

Parking Structure G Bridge Cover Glassed weather cover for bridge from Parking Deck G to campus. 6/9/2009 Parking Deck Structural Repairs (Decks G, H, Structural, expansion joint, sealant, coating repairs necessary to preserve existing 34 J) and 42 year old parking decks. 5/9/2009

s t s

-N

MSU Extension

Macomb County

Foreclosure Case Management

Mt. Morris Township

Mt. Morris Charter Township, Genesee County

Bangor / Humphrey Subdivision

Extending 8-inch watermain and sanitary sewer throughout the subdivision to eliminat the individual water wells and septic tanks, which are currently failing. Bangor, Humphrey, Chicago and Smith roads. 3/9/2009

Mt. Morris Township

Mt. Morris Charter Township, Genesee County

Jennings Road

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

Bangor Township

02262009

R d

e t t

Hidden Road to Lupine Dr. Water Main Loop Fletcher Subdivision Drainage Improvement Phase I

it

m b u

S

Bangor Township

e u

eq

Submitted Requests - Not Approved

O R

P P A 6/9/2009

Flint

Bangor Township

D VE

1,210,200

8/9/2009

ASAP

10/9/2009

Route (Infrastructure Only)

5,850,000

$

Community Technology Centers &Wagner Workforce Education Center

Bangor Township

$

1,600,000

Flint

Flint

Funding Request

$

Foreclosures are projected to continue to increase through 2009. In addition, nationally over half of the loan modifications processed during the first half of 2008 failed.To assist these residents, foreclosure counseling and financial management education will be needed.

Bangor Township

Expected Completion Date

370 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bangor Township

Music Hall Center for the Performing Arts

Muskegon County

Muskegon County

Bangor Township

Detroit

City of Muskegon

Project Name

Euclid Ave. - Beaver Rd. to Tobico Beach Water Main

Music Hall Building Renovation Project

Music Hall opened in 1928 as the Wilson Theatre, named for founder Detroit philanthropist Matilda Dodge Wilson. Ms. Wilson believed theatre must be made available to everyone regardless of their race, culture or financial abilities. Music Hall quickly became an important element of the strong arts and cultural traditions in Detroit. Our programming reflects that full spectrum of Detroit’s diversity. Our complimentary education programs reach over 25,000 youth and our performances employ over 4,000 artists annually along with thousands of vendors and contractors who depend upon a robust season of Music Hall activities. Our collaborations with over 75 other non-profits support Detroit’s continued renaissance. To that end, the need for building renovation has placed this 80-year-old institution at risk for continuin its operations. Our proposal to renovate necessities include replacing a 20-year-old leaky roof with a green roof to reduce utilities and protect the theatre, replacement of original stage fire curtains, fire suppression system, fire alarm system, exterior storm canopy, basement sump pump, HVAC and plumbing. We also need to repair brick ex March, 2009

Pump Station D

Muskegon County

City of Muskegon

D to C forcemain

City of Muskegon

ub

Muskegon County

Egelston Township

Muskegon County

S

Muskegon County

i m

Egelston Township

Moorland Township

02262009

eq

Lining of approximately 1 mile of 24" and 30" sanitary sewer and manholes.

4/9/2009

R d

e t tt

Ruddiman Sewer Rehab

s t s

-N

e u

Ruddiman Sewer Rehabilitation

City of Muskegon

T O

Replacement of Existing Pump Station D, yard piping modifications, demolition of the existing pump station, and appurtenances. 8/9/2009 The old force main that was abandoned in 2008 needs to be filled with grout to protect local roads. summer

An old main line gravity sewer serving the communities of Norton Shores, City of Muskegon, and Roosevelt Park has been videoed and is in major need of lining. The first third of the work was done in 2008. summer

Outfall 002

Modifications to Cell 4 to improve septage receiving facilities.

Cell #4 Septage Receiving

As a service to much of the state, the plant has expanded its acceptance of hauled liquid waste, primarily septage, restaurant grease, and food processing waste so that about 3 million gallons is trucked in to the plant monthly. Cell #4 needs an upgrade to handle up to six trucks dumping at once. summer

Outfall 002

Reconstruct Outfall 002 pump station and construct 1 mile of force main to route force main to the north. This will give the County the ability to discharge to a collection ditch, storage lagoon, and in emergencies to the existing discharge. 4/9/2009

Submitted Requests - Not Approved

8/1/2009

O R

Funding Request

D VE $

307,950

$

5,000,000

Route (Infrastructure Only)

P P A

Flowable Filling 3.2 miles of force main ranging from 30"-42" diameter from PS D on Lakeshore Drive through the city streets to PS C on Western Avenue. 4/9/2009

PS D to C FM Abandonment

City of Muskegon

Start Date

Replacing 2,600 lineal feet of aged and/or undersized existing water mains with a 12inch PVC water main. The new main will extend from the existing 24-inch main at Beaver Road northward along North Euclid Avenue to Tobico Beach Road where it wi be connected to an existing 10-inch water main. An existing 8-inch water main at Killarney Beach Road and approximately five existing 1-inch water services will also be reconnected. 5/1/2009

Muskegon County

Muskegon County

Project Description

Expected Completion Date

5/9/2009

May, 2010

9/9/2009

9/9/2009

$

Upstream of PS D along the Ruddiman Lagoon and adjacent to 450,000 McGraft Park

$

Upstream of PS D along the Ruddiman Lagoon and adjacent to 900,000 McGraft Park On Existing PS D site by Muskegon 4,500,000 Lake

11/10/2009

$

fall

$

400,000

fall

$

800,000

9/9/2009

$

Septage Receiving Improvements Cell 600,000 4

fall

$

500,000

$

Outfall 002 to discharge 1 mile 900,000 north.

10/9/2009

371 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Muskegon County

Moorland Township

Project Name

Project Description

Start Date

Expected Completion Date

The 40-foot tall fly ash landfill at the down-wind side of 1,700 acres of storage lagoons is an ideal site for wind generation. Three 1-megawatt units can fit in this area and begin what could be a large wind generation farm at the Wastewater Plant's 11,000 acres. Several years of data have been taken on the site. summer

Fly Ash Wind Turbines

fall

O R

Muskegon County Muskegon County Muskegon County

Muskegon County

Muskegon County

Muskegon Charter Township, Egelston Township, Moorland Township Muskegon County Muskegon County

City of Muskegon

City of Muskegon and Laketon Township

Muskegon County Muskegon County

Egelston Township Muskegon County

Muskegon County Muskegon County Muskegon County Muskegon County Muskegon County Muskegon County

All Townships City of Muskegon City of Muskegon City of Muskegon City of Muskegon City of Muskegon

Muskegon County

City of Muskegon

u S

02262009

T O

Business Park East infrastructure Water Wastewater

Pump Station D

This aging lift station needs replacement with smaller pumps and the paper mill piping will need to be changed so that the mill can pump directly to C Station, saving much energy and providing more reliability at D Station. 2010

d e t

Muskegon Channel Crossing

itt

bm

Sullivan Pump Station Apron Reconstruction and Expansion

Juvenile Detention Center Jail Facility Y Property Vets Center Mental Health Building Transit Parking Ramp

-N

e u

q e R

Construct a 36" water main that crosses the channel at the west end of Muskegon Lake and traverses Laketon Township to connect into the existing North Side Water System . This channel crossing will provide reliability for the system.

Rehabilitation of the existing Sullivan Pump Station.

1/10/2009

10/9/2009

Establishment of perpetuation of remonumentation PLS corners, installation of MCOR stations 3/1/2009 Replace Existing Juvenile Detention Center 7/1/2009 Replace Existing Jail 7/1/2009 Purchase Waterfront Property/Clean up/recreation Spring 2009 Construct A Veteran Center/Clinic Spring 2009 Build new 38,000 square foot Community Mental Health Building Immediate Construct a downtown Muskegon Transit Center and Parking Structure for the Muskegon Area Transit System. 4/1/2009

Submitted Requests - Not Approved

D VE $

P P A

Placement of approximately 18,500 lineal feet of 16" watermain and approximately 42,500 lineal feet of 24" watermain, two 500,000 gallon elevated water storage tanks and one booster pumping station. 6/10/2009 Water Wastewater

s t s

Funding Request

Route (Infrastructure Only)

6,000,000

M-46 (Apple Avenue), Mill Iron Road to Swanson Road; Hall Road, Sheridan to Mill Iron Road, Mill Iron Road, Hall Road to Apple Avenue; Evanston Avenue, Dangl Road to Mill Iron Road, Mill Iron Road, Evanston Avenue to Laketon 18,000,000 Avenue 5,000,000 Yes 6,200,000 Yes

9/11/2009

$ $ $

2010

$

4,000,000

$

Crossing the Channel at the west end of Muskegon Lake and connecting into the existing North Side Water System in Laketon 6,000,000 Township

7/9/2009 7/10/2009

$ $

On Metro site at the existing Sullivan Pump Station south of the storage 1,800,000 lagoons. 2,500,000

12/9/2009 12/31/2010 12/31/2010 Fall 2009 Fall 2010 11/9/2009

$ $ $ $ $ $

73,358 County 6,000,000 14,000,000 2,000,000 2,500,000 6,150,000 NA

3/31/2011

$

10,000,000

11/10/2009

372 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Muskegon County

Dalton Township

Project Name Class A Roads

Muskegon County

Moorland Township

Metro Outfall 002

Muskegon County Muskegon County

Muskegon Muskegon

Jail Road Patrol Garage John Halmond Center

Muskegon County

Muskegon

Energy Retrofit

Muskegon County

Muskegon

TEROD

Muskegon County

Muskegon Charter Township

Muskegon County Muskegon County Muskegon County Muskegon County Muskegon County Muskegon County Muskegon Heights High School

Project Description Upgrade Central/Tyler Road to Class A for Econ Dev in Business Park North Contract with General Motors

Muskegon Heights High School Athletic Building Expansion

Muskegon Heights

5/9/2009

6/9/2009

Spring 2009

3 2009 2009

1 2009

P P A

N s

t s e

Route (Infrastructure Only)

1,600,000 Central/Tyler

D VE $

600,000

$ $

100,000 5,749,832

$

6,000,000

2009

$

350,000

10/9/2009

$

Easement on 220,000 private property

6/30/2010 9/30/2010 10/31/2009 10/31/2009 10/31/2009 10/31/2009

$ $ $ $ $ $

600,000 1,300,000 2,000,000 2,500,000 1,000,000 3,000,000

1/1/2010

$

5,500,000

8/30/2010

$

6,000,000

O R

Spring 2009

Extnd approximately 2000 feet of 16" watermain into the Bayer Crop Science property to facilitate expansion of their production facility and to allow for future expansion of economic development of property owned by Bayer 6/9/2009 Purchase and install upgraded fare collection equipment for Muskegon Area Transit System. 7/1/2009 Replace aging buses in Muskegon Area Transit System fleet 4/1/2009 Four Bay Airport Fire Station 6/1/2009 Rental Car Service Facility 6/1/2009 Airport Entrance Road Reconstruction 6/1/2009 Aircraft Hangar Development 6/1/2009 Construction of auxiliary gymnasium with seating, dressing rooms, showers, restrooms and fitness center. 7/1/2009

T O

Transit Fare Equipment Upgrade Transit Bus Replacements

Funding Request $

By MDEQ Order, the discharge from the Metro Outfall 002 must be diverted to the Wastewater System's Rapid Infiltration Basins or the storage lagoons by rebuilding the pump station and constructing a mile of 20-inch pipe Convert pole bldg.garage to Muskegon County Sherrif Dept. Road Patrol Service Garage. 37,361 SF Addition to Community Mental Health Upgrade Muskegon Coutny Facilities Lighting, HVAC, water usage components and building shell/glass. Renovate an existing County facility to accommodate the Muskegon County: Treasurer Dept.; Equalization Dept.; Register of Deeds.

Bayer Crop Science Water

Muskegon Heights Muskegon Heights Norton Shores Norton Shores Norton Shores Norton Shores

Start Date

Expected Completion Date

2010

Muskegon Museum of Art City of Muskegon

MMA Facility Upgrade Project

The Muskegon Museum of Art, accredited by the AAM since 1984, and owned and governed by Muskegon Public Schools, houses a substantial permanent collection of American and European art (6,000+ objects) that significantly enhances the quality of life in the West Michigan region. This project will provide provide critically needed upgrades to the physical plant, including ASHRAE Compliant mechanical and electrical systems that will meet American Association of Museums' standard of care requirements, additional ADA improvements, more suitable and appropriate storage facilities for the art, and additional public education spaces, housed in a 17,000 square foot addition (basement plus 2 floors) to the current facility. The current mechanical systems were installed in the early 80's and some in the early 90's, and must be replaced within the next five to seven years, but cannot be replaced in the attics where they currently are located, thus requiring addtional square footage. This project, and the entire facility, will be LEED certified at a minimum at its completion. 6/15/2009

Napoleon Township

Napoleon Township

Municipal Water Service Extension to High Density Residential District via System Loop

Connect 321 residences to existing municipal water system and complete system loop.

6/1/2009

12/1/2009

$

5,061,392

Napoleon Township

Napoleon Township

Municipal Sewer and Water Service to Township's West End Industrial Corridor

Construct 5 miles of underground sewer main and 5 miles of underground water main to 330 parcels in the west end industrial district of the Township. 6/1/2009

12/1/2009

$

10,366,675

Napoleon Township

Municipal Water Service to TransPharm HiTech Business District

Construct 2,150 feet of underground water main extending the Township municipal water system to the TransPharm Hi-Tech Business District in order to facilitate hi-tech business and job growth. 5/1/2009

9/1/2009

$

190,383

Napoleon Township

Wireless high-speed Internet Infrastructure for Implement hi-speed wireless internet across a two square mile area providing access Village, Schools, and TransPharm Hi-Tech for 481 residences, Napoleon Schools, the M-50 Business Corridor, and the Township's TransPharm High-Tech Business District 6/1/2009 Business District

12/1/2009

$

307,036

u q e

Napoleon Township

Napoleon Township

R d

i m

ub

S

02262009

e t tt

Submitted Requests - Not Approved

373 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Napoleon Township

Deteriorated Sidewalk Infrastructure Replacement and Extension

Replace 8,886 feet of badly deteriorated sidewalk and construct 18,042 feet of sidewalk to connect 280 low-income and elderly single-family residences to the municipal sidewalk network and schools.

Canton

Achieve Charter Academy

New charter school facility

3/1/2009

8/15/2009

Lansing

Lansing Charter Academy

New charter school facility

3/1/2009

8/15/2009

Taylor Alcona County

Quest Chater Academy Alcona Black River Watershed Initiative

New charter school facility Develop an approved watershed management plan

3/1/2009 7/1/2009

8/15/2009 7/1/2010

NEMCOG

Cheboygan County

Cheboygan/ Lower Black River Watershed Land Use and Stormwater Management Initiative

Implementation of the approved Nonpoint Source Pollution Management Plan for the Cheboygan River/Lower Black River Watershed. 7/1/2009

NEMCOG

Montmorency, Alpena, Alcona, Oscoda and Presque Isle Counties

Thunder Bay River Watershed Implementation Implementation of an approved Nonpoint Source Pollution Management Plan for the Project Thunder Bay River Watershed. 6/1/2009

NEMCOG

Montmorency, Alpena, Alcona, Oscoda and Presque Isle Counties

Thunder Bay River Watershed, Watershed Education and Land Use Center

Provide for the long-term protection of the Thunder Bay River Watershed through the integration of water resource protection measures into local regulatory programs and landuse/master plans and daily planning decisions. Immediate

Water, sewer and road infrastructure improvements

Water, sewer and road infrastructure improvements along a primary commercial corridor in New Buffalo Township Michigan (the “Infrastructure Project”) which will promote tourism businesses and development to the area, including the following project recently approved by the Township: a mixed-use destination resort with 280 rooms, 60 detached resort units, 30,000 sft conference facilities, 60,000 sft indoor waterpark, 212 residential units, 7 retail outlots, all in a clustered/open space development with 40% of the 100-acre property being dedicated to open green space (the “Resort Project”). The engineering field work for the Infrastructure Project has been completed, and portions of the final design are in process. The Infrastructure Project, followed by the Resort Project, will increase out-of-state tourism to Southwest Michigan (30.2 million people live within 200 miles of New Buffalo, more than 75% of whom reside outside the State); induce additional development of related and support businesses along US-12 from New Buffalo to Three Oaks; improve the Township’s water system reliability and fire protection by correcting what are now two long dead e 7/15/2009

11/15/2010

$

Laporte Road intersects I-94 at Exit 1 in New Buffalo Township. This interchange area has been developing and currently has a Holiday Inn, Best Western, Roadway Inn, McDonalds and Shell gas station. A new Marriot Fairfield Inn will be opening this spring and the planning commission just approved a 150 unit residential/commercial development and another hotel within this same area. Other hotel, recreation and multifamily housing developments are in the planning and design stages. The sewer system for this area discharges to the City of New Buffalo’s sewer system. The City’s system is at capacity and the MDEQ has restricted the amount of sewer than can be discharged through the City. The Township has completed the plans and obtained the permits to redirect the sewers from this area to a recently constructed and oversized forcemain that flows around the City directly to the interceptor and GRSD Sewer Authority Plant. The work includes extending gravity sewer from the existing lift station on Laporte Road to the intersection of Kinst and Farina Road, installing a new lift station at Kinst and Farina Road, extending a new forcemain to the existing main a 4/1/2009

11/15/2009

$

Napoleon Township National Heritage Academies National Heritage Academies National Heritage Academies NEMCOG

T O

5/1/2009

8/1/2009

$

851,733

D VE $

7

$

6

$ $

7 36,000

7/1/2011

$

128,000

6/1/2012

$

532,000

One year project

$

159,408

O R

P P A

Route (Infrastructure Only)

N s

New Buffalo Township New Buffalo Township

tt i m

b u S

New Buffalo Township New Buffalo Township

02262009

d e t

Sanitary Sewer Improvements

t s e

qu

e R

Submitted Requests - Not Approved

US Route 12, Maudlin Rd., Hoder Rd. and Lakeside Rd. in New Buffalo 124,600,000 Township

LaPorte, Kinst and 1,200,000 Farina Road

374 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

New Buffalo Township New Buffalo Township New Buffalo New Buffalo Township County

Project Name

Project Description

The Berrien County Road Commission is reconstructing approximately 2 miles of roads on Hoder Road from US12 to Maudlin Road and Maudlin Road from Hoder Road approximatley 1 mile west. The roads will be constructed to all season standards and are schedule for reconstruction in 2009. The heavy soils and high groundwater are not suitable for septic systems and municipal sewer service is needed. The watermain is necessary to loop the system and eliminate two dead ends. The extesion will also provide water and sewer service to the I-94/exit 4 interchange. The availability of water and sewer in this area will encourage development. The existing municipal water and sewer end at the beginning of this project and need to be extended prior to the road being reconstructed this year. The Township does not have the funds to extend the water and sewer and the cost will increase significantly after the road is reconstructed. The plans are almost complete and ready for permitting. The work can begin within 90 days. 5/1/2009

Water and Sewer Improvements

Berrien

New Buffalo Township New Buffalo Township

Start Date

Expected Completion Date

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

11/15/2009

$

Maudlin and Hoder 1,190,000 Roads

4/1/2009

10/31/2009

$

LaPorte Rd to Kinst 1,200,000 Rd to Maudlin Rd

60 days

6-8 months

$

1,200,000 NA

Within two years

$

120,000

2/15/2009

8/15/2009

$

150,000

Scan records for each Court for Newaygo County. Records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing Objectives: ease of access, increased efficiency, improved image quality. 2/15/2009

8/15/2009

$

27,000

Construct sanitary sewer to by-pass City of New Buffalo limited capacity sewer system and foster local economic growth along highway

LaPorte Rd Sewer By-Pass Laporte Road Sewer By-Pass/Laporte Road /Kinst/Maudlin Road

By-passing City of New Buffalo limited capacity sewer system

New Detroit Sounds

Programming of New Detroit Sounds addresses three important needs in the city of Detroit: the critical shortage of viable venues for significant national contributors to the arts, the relative lack of contemporary art in the public realm, and the lack of intergration across the regional creative scene. Our long-term mission as New Detroit Sounds is to be the most affordable, dynamic venue for culture in Detroit, bridging the gaps between age, ethnicity, economics and religion. We hope to continue elevating the quality and cooperation of Detroit’s creative community by presenting major artists of merit, regardless of medium or genre, while exposing a wider audience to workshops and master classes by our local greats and international masters. We will facilitate behind the scenes, with cheap or free work studios and rehearsal space that are utilized by local and visiting artists. ASAP

T O

N s

t s e

New Detroit Sounds

Detroit

u q e

R d

Newaygo Circuit Court White Cloud, MI

i m

b u S

Newaygo Circuit Court White Cloud, MI

02262009

e t tt

Community, County & Court Connectivity Initiative (4C's)

Court & Community Connectivity Initiative (CCCI)

Scan records for each county office. Records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Objectives: ease of access, increased efficiency, improved image quality, for both public and staff.

Submitted Requests - Not Approved

375 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo Circuit Court (including Clerk's office and Friend of the Court White Cloud, MI

Newaygo County

Newaygo County Newaygo County

Newaygo County

Newaygo County

County of Newaygo, White Cloud, MI

County of Newaygo, White Cloud, MI County of Newaygo, White Cloud, MI County of Newaygo, White Cloud, MI

County of Newaygo, White Cloud, MI

Project Name

Court & Community Connectivity Initiative (CCCI)

GIS web-based mapping

Restructure and redevelop the current web-based GIS map program to provide the public and other businesses a consistant, accurate and simple to use internet map service.

Thin-Client/Virtual Desktop

Thin-Client/Virtual Desktop system solution project to enable end user computing resources through a VDI model in compairson to the traditional workstation model. Eliminating excessive end user desktop hardware and increasing IT efficiencies.

End user software upgrade

Bring all end users MicroSoft Office software up to the same version. (150 licenses)

AS400 Upgrade

Purchase and implementitation of new i-Series AS400 Server to replace the current unit which is at it's end-of-life. Project and cost assumes new scanning program is in place. immediate

25,000

immediate

9/1/2011

$

30,000

immediate

7/1/2009

$

42,000

12/31/2009

$

75,000

SAN System

SAN network storage system expansion and upgrade. Implementation of virtual servers and eliminate multiple server hardware components (towers and monitors) and expand networking capabilities. Improved SAN technology would permit off-site backup of data and allow for the Implementation of thin-client technology. immediate

3/1/2010

$

100,000

Scanning

Upgrade current scanning system and offer scanning capabilities to other County departments, progressing towards paperless document processing, retention and archiving.

immediate

9/1/2010

$

160,000

immediate

5/1/2011

$

90,000

8/9/2009

1/11/2009

$

200,000

Esuite Foundation

Esuite Foundation - Eemployees, Ebenefits, Benefits Administration, this would allow employees to view and maintain personal information. Employees can view a history of paychecks, the user can view and request changes to their direct deposit account information. Employees can see the Vacation/PTO accruals. Employees can see taxes and pay rate information history without having to contact the payroll department. Employees can view a history of their benefits and deductions, open enrollment periods can be done at the employees convenience over the internet with the enrollment information automatically collected and validated. This saves time within the HR/Payroll Dept by not having to re-key enrollment information. It also saves employee time by not having to deliver the hand written forms to a specific location and reduces waste used for duplicate hard copies of each form. 6/9/2009

9/30/2010

$

60,000

Newaygo County

Grant

COA satellite office

tt i m

b u S

d e t

T O

N s

st

e u

q e R

P P A

New County-wide GIS orthophotography flyover. Purchase existing vacant building and retrofit as a satellite office to expand current services.

Newaygo County

Newaygo County

GASB software upgrade

New World Govt Reporting module - This would enable us to have our audit in the proper format so the auditors wouldn't have to convert our numbers to the correct format.

6/9/2009

9/30/2009

$

13,000

Newaygo County

Newaygo County

2-11 Response system

To establish a 2-11 response system for Newaygo County so that individuals in need of human services can most effectively be directed to the available service. 6/9/2009

6/10/2009

$

350,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

Orthophotography-GIS flyover

Newaygo County

O R 8/15/2009

Funding Request

9/1/2009

Newaygo County

Newaygo County

Start Date

Scan all Circuit Court records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. Objectives: ease of access, increased efficiency, improved image quality.

County of Newaygo, White Cloud, MI County of Newaygo, White Cloud, MI

Newaygo County

Project Description

Expected Completion Date

376 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Newaygo County

Newaygo County

Wellness Center/Child Day Care Center

Wellness Center/Child Day Care Center - It would be beneficial to the economy to provide day care services to the county employees. By providing this service, it would place more single parents in the work force. In addition, providing a wellness center would afford county employees an opportunity to become healthier and maintain good health; which in turn saves on health insurance costs. Therefore, Newaygo County is taking this opportunity to ask for a feasibility study in regards to providing a Wellness Center/Child Day Care Center for its county employees. 6/9/2009

Newaygo County

White Cloud

Bus garage

Insulated bus garage with electricity, overhead doors at each end of the building, and a wash bay to help prolong the lives of the fleet vehicles (5 buses and 6 vans). 8/9/2009

Jail Expansion Project

To expand the Newaygo County Jail and construct a new Sheriff's Office. The jail expansion would create 60 beds to house additional federal inmates and the new Sheriff's Office would replace an antequated mdular structure. The new facility would incorporate green infrastructure technology to reduce utilty costs and better harness renewable energy. 6/9/2009

Jail Expansion Project Infrastructure Improvements

To upgrade and expand critical infrastructure that supports the county Jail expansion project. Project includes the expansion and/or upgrade of water, sanitary sewer, storm sewer, street and sidewalks. 6/9/2009

5 Year Financial Forcasting & Cash Flow Module

5 Year Financial Forcasting & Cash Flow Module - In these times of billing taxes in July and not receiving the majority of the tax money until after February in the next year, it is very difficult to maintain the proper operating cash flow. This module would help us determine how much we can safely invest. 6/9/2009

GIS system upgrade

Updating the current GIS system, data and user skill sets

Newaygo County

Newaygo County

White Cloud, Newaygo County White Cloud, Newaygo County

Newaygo County Newaygo County

Newaygo County

Newaygo County

Newaygo County

County of Newaygo, White Cloud, MI

Brooks Township, Everett Township, City of Newaygo Community Pennoyer NonNewaygo Motorized Recreation Trail

d e tt

City of Newaygo

it

02262009

st

immediate

The Newaygo Community Recreation Authority has in its recreation plan a 3.4 mile non-motorized trail along M-37 that will connect the Newaygo area to the County Sports Park Complex. This proposed path will also connect to trailhead of the North Country National Scenic Trail, which will allow area residents and visitors to access a comprehensive trail system. This trail system will provide the opportunity for better health among County residents and alleviate automobile congestion on M-37. 4/1/2009

q e R

Funding Request

D VE $

100,000

$

275,000

6/10/2009

$

7,000,000

6/10/2009

$

1,000,000

9/30/2009

$

53,000

3/31/2009

$

16,600

6/1/2010

$

933,280

8/1/2009

O R 8/10/2009

$

507,289

Homeowner Training and Tool Sharing Programs

Provide homeowners the opportunity to learn basic maintenance/repair skills, housekeeping skills, life skills (budgeting, shopping, recycling, landscaping). Inventory common tools for loan to homeowners, and provide environmentally friendly cleaning Immediately upon 2 years following supplies. receipt of funds start date

$

50,000

Contractor Training Programs

Provide funds for building/general contractors and other licensed trades education and training assistance for lead remediation and abatement, continuing education for license renewal, housing program updates and orientation. This will lead to more redeveloped, energy efficient homes. Redeveloping homes rather than building new Immediately upon 2 years following will preserve greenspace (including farmland) in our county. receipt of funds start date

$

55,000

m b u

Newaygo County

Newaygo County

N s

9/30/2010

P P A

As part of its mission to increase the physical well being of the county and combat childhood obesity, the Newaygo Community Recreation Authority is creating a new skate park. The property has been purchased, which includes a house that will be renovated for bathrooms and a warming shelter. Funding has also been secured for Newaygo Community Recreation Skate Park the skateboard portion of the facility. Additional funding is needed to provide parking, (ice, board, blade, etc.) lighting, and the outdoor ice rink. 3/20/2009

S Newaygo County

T O

e u

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

377 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Newaygo County

Project Name

Project Description

Start Date

Expected Completion Date

Provide funds to homeowners that have exhausted all options for assistance in making emergency repairs, other necessary repairs that need attention, pay delinquent property taxes when necessary to meet various assistance programs' eligibility requirements or to prevent property foreclosure. The program will improve neighborhood presentation by preventing blight, prevent potential homelessness, and Immediately upon 2 years following improve homeowner self-esteem and pride in the community. receipt of funds start date

Home Repair and Housing Needs Program Update of Newaygo County's Solid Waste Management Plan To update the Newaygo County Solid Waste Management Plan. County Wide High Speed Internet Feasability To conduct a feasibility study to determine the steps needed to provide high speed Study internet services county wide. To conduct a feasibility study to determine the likelihood of creating a county-wide Newaygo County Recycling Feasibility Study recycling program that would include drop off sited staged throughout the county. Newaygo County FarmLand Presevation To conduct a feasibility study to determine the likelihood of creating a county-wide Feasibility Study farm land preservation program.

D VE $

60,000

$

220,000

$

220,000

6/10/2009

$

220,000

6/10/2009

$

220,000

9/9/2009

$

100,000

6/9/2009 4/1/2009

6/9/2009 6/30/2009

$ $

10,000 15,000

6/9/2009

PP

6/9/2009

A T

6/9/2009

6/10/2009

O R

6/9/2009

Multiple County departments utilize the BS&A software system to carry out their essential functions (taxes, assessments, permits) and provide services to the public. The current software system will soon be to out of date to receive maintenance and needs to be upgraded to the .net platform. This will involve hardware and software upgrades. 4/9/2009

O N

Funding Request

6/10/2009

Newaygo County

Newaygo County

Newaygo County Newaygo County

White Cloud White Cloud

BS&A Software Upgrades Update restroom stools in Health Services Building Lighting efficiency

Newaygo County Newaygo County

White Cloud White Cloud

Update HVAC at DBH Energy Study

Change out all the stools in the Health Services Building to water efficient stools. Change out all ballasts now T12's to T8 ballast for more energy efficiency Roof top units(HVAC) at DBH are beyond their life expectancy. Changing the units out will provide better efficiency for energy. Conduct energy audits on our buildings

7/9/2009 6/1/2009

7/9/2009 12/9/2009

$ $

60,000 200,000

Fixed Asset Tracking

New World Fixed Asset module - Currently we have only Excel spreadsheets to track our fixed assets. This module would be very helpful in tracking assets per department, calculating depreciation, and removing assets we no longer have. 4/9/2009

9/30/2009

$

7,000

Newaygo County has applied for funding through the EPA Brownfields program to assess and inventory brownfield properties.The Newaygo County Brownfield Authority established in 2007, has received a $100,000 startup grant from a local community foundation. With this grant, the Authority has developed a county-wide brownfield plan to guide future redevelopment projects, supplied funding to perform Phase I and II environmental assessments and write a Baseline Environmental Assessment and brownfield plan for a pilot project in the City of Newaygo, which is able to be recouped through tax increment financing, and put the small amount of remaining moneys into a local site remediation revolving fund. With a $200,000 EPA grant for hazardous materials contaminated sites and a $200,000 grant for petroleum contaminated sites, the Brownfield Redevelopment Authority would be able to target an additional 12 sites for redevelopment. This would provide environmental remediation, stimulate economic development, protect existing greenspaces in the county, and limit urban sprawl, as well as removing some environmental cleanup burdens from the Michigan DImmediately

12/1/2010

$

400,000

To upgrade the computer aided dispatch system for 911 police/fire/ems dispatching along with server upgrades for the new software application. Server upgrade would also cover county mapping GIS, implementation of computer aided dispatch in emergency units. Creating interoperability between County emergency units, data sharing, and file sharing. Also including AVL (automatic vehicle location) tracking on dispatching software. Along creating interoperability with several neighboring counties in the state using the same type of system. 5/1/2009

5/1/2010

$

450,000

Newaygo County

d e tt

Newaygo County Brownfield Redevelopment Authority

Newaygo County Central Dispatch

Newaygo County, Michigan - Specifically Fremont, Grant, Newaygo, White Cloud, and Hesperia, Michigan

t i m

b u S

Brownfield Assessment

Newaygo County and all encompassing townships within. Computer Aided Dispatching

02262009

e u

st

q e R

s

Submitted Requests - Not Approved

Route (Infrastructure Only)

378 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County Convention & Visitor's Bureau Newaygo County

Newaygo County Economic Development Office

Newaygo County

Newaygo County Emergency Services

Troy Township, Lilley Township, Home Township, Barton Township, Beaver Township, Denver Township, Merrill Township, Monroe Township, Norwich Township, Lincoln Township, Wilcox Township, and Goodwell Township in Newaygo County

Newaygo County Emergency Services

City of White Cloud

Project Name

Project Description

Start Date

Expected Completion Date

Newaygo County Tourism Promotion

Newaygo County has a newly formed Convention and & Visitor's Bureau. Unfortunately, we do not have many lodging facilities that can collect a room assessment fee to properly fund a comprehensive tourism marketing program. Funds under this program will also be used to partner with state and regional tourism agencies to promote Newaygo County. Tourism is a major industry in Newaygo County and can also lead to private investment. 4/1/2009

Newaygo County Targeted Industry Study

The Newaygo County Economic Development Office (NCEDO) is the lead economic development agency for the County. Currently, the county has several Industrial/Business parks that have land available for business relocation and expansion. This study would allow us to target industries and companies that would be a good fit for our community and create jobs. Our current budget is not sufficient to carry out this type of needed study. 4/1/2009

D VE $

270,000

9/1/2009

$

100,000

Newaygo County Wildfire Urban Interface

The Huron Manistee National Forest covers 61 percent of Newaygo County and hosts a high concentration of recreational and seasonal forest activities such as camping, hiking, recreational vehicle trails, horseback riding, etc. In addition to providing recreational opportunities, many seasonal and permanent homes have been built in and around the Manistee National Forest making Wildland-Urban interface difficult. Currently, there are no regulations to prevent residents from building in fire prone areas or requiring defendable spaces around their homes. Many of these residential areas are built around narrow roads and driveways and directly next to the wood line. This project would coordinate with the National Forest Service in developing a Wildfire Urban Interface Plan and working with townships to develop wildfire mitigation ordinances. 3/1/2009

12/31/2010

$

500,000

EOC Funature and Office Supplies

Funding was recently provided for upgrades to the Newaygo County Emergency Operations Center out of the FY 2006 Homeland Security Grant for communications equipment, data displays, and cyber security for the Emergency Operations Center Network. However, the funding did not allow for Tables, Chairs, EOC Go-Kits, Supply Package, and Copy Machine. This project would provide need equipment for the Newaygo County Emergency Operations Center that was not eligible under other funding sources. 4/1/2009

7/1/2009

$

10,320

8/1/2009

$

66,073

T O

O R

P P A

N s

t s e

u q e

4/1/2011

Funding Request

Route (Infrastructure Only)

R d

e t tt

i m

Newaygo County Emergency Services

b u S

City of White Cloud

02262009

EOC/Sheriff Department Generator

Newaygo County recognizes a fully capable emergency operations center facility is an essential element of a comprehensive emergency management system and is necessary to ensuring continuity of operations and continuity of government in a majo disaster. With Newaygo County touching 8 out of the 13 Counties in Region 6, it makes the County EOC an ideal location for a Regional Coordination Center during incidents impacting multiple Counties within the Region. This project investment would make the Newaygo County Emergency Operations Center sustainable, secure, and more efficient by installing a generator with an automatic transfer switch, installing a card swipe access security system, and creating a separate conference room within the EOC. The generator will provide the EOC Building with a stable, self-sufficient power source allowing the EOC to maintain its operational integrity during power outages. The card swipe access security system will enhance the physical security measures making the EOC and the EOC Communications Room safe and secure by adding three readers on the exterior and interior EOC doors and the EOC Communica4/1/2009

Submitted Requests - Not Approved

379 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County Emergency Services Newaygo County Emergency Services

Newaygo County

Newaygo County

Newaygo County Park and Recreation Big Prairie Township, Department Newaygo County

Newaygo County Park and Recreation Lincoln Township, Department Newaygo County

Newaygo County Park and Recreation Big Prairie Township, Department Newaygo County

Newaygo County Park and Recreation City of Newaygo, Department Newaygo County

Project Name

u S

Newaygo County Road Big Prairie Township, Commission Newaygo Cty.

02262009

Start Date

Newaygo County Shelter Supplies

The Muskegon, Oceana, Newaygo Chapter of the American Red Cross serves Newaygo County. During times of emergencies, when Newaygo County needs to establish a shelter to provide food, clothing, and shelter services to residences, all equipment and volunteers come from Muskegon County. Because the chapter serves three counties, their resources are split in half if multiple shelters are opened. The American Red Cross would like to establish shelter supplies including Cots, Blankets, Disaster Health Service Kits, Comfort Kits, and food clean up kits within Newaygo County. 3/1/2009

Newaygo County Narrow Banding

Mobile and portable radios, pagers, and dispatch equipment upgrades to be narrow band compliant for emergency first responders, schools, and department of public works agencies across the county

Sandy Beach County Park Improvement

Sandy Beach is an important destination park on 4,000 acre Hardy Pond. It has a funded project of $448,000 to begin park improvements including paving one mile of roadway, utility service to 22 campsites, picnic shelter, boat launch dock, and 2 camping cabins. Additional improvements remaining to be funded include: pave remaining interior roads (225,000), electric service to 90 campsites (150,000), replacement of aged toilet/shower building (300,000), provide public contact station (60,000), 2 vault toilets (20,000), and maintenance/storage garage (20,000). 9/30/2009

D VE

56,520

$

200,000

9/30/2010

$

1,198,000

Diamond Lake County Park Improvement

Diamond Lake sits on 156 acres of land purchased by Newaygo County in 2008 for $1,200,000. This site was formerly an abandoned private recreation area. A number of improvements are needed for this facility to effectively serve as a public park. This project would provide for a public contact station (75,000), day use road and parking (100,000), level and construct camping pads on camp sites (50,000), develop boat launch (75,000), construct 2 vault toilets (20,000), grading and sign at entrance (5,000). 9/30/2009

9/30/2010

$

325,000

Hardy Dam County Marina Improvement

Hardy Dam Marina provides a regional public boat slip and launching facility for boaters on 4,000 acre Hardy Pond. The existing slips were inadequate to meet the needs of current boaters and a new design was engineered. $240,000 was invested in new toilet facilities and replacing 24 slips and walkways. The remaining 16 slips are unsafe for continued use and require imediate replacement (150,000). The plan also includes electric service to 40 boat slips (100,000). 4/1/2009

11/1/2009

$

250,000

In addittion to a variety of recreational facilities, this park provides rear round boating access to the Muskegon River. It receives extensive use by the general public, liveries, and commercial fishing guides. The roads asphalt surface is over 35 years old and requires an asphalt overlay to protect it from further deterioration. Project would provide an asphalt overlay on 17,000 square yards of road and parking lot. 4/1/2009

4/30/2009

$

114,000

Day use and boat launching activity at Pettibone Lake has grown to the point that the site requires expanded parking lot development (20,000), with a vault toilet (10,000). 4/1/2009

9/30/2009

$

30,000

60,000

itt

d e t

Henning County Park Road Repair

bm

T O

q e R

O R

5/1/2009

P P A

N s

st

e u

8/1/2009

Funding Request

$

Newaygo County Park and Recreation Lilly Township, Newaygo Department County Pettibone Lake County Park Improvement

Newaygo County Register of deeds Office Newaygo County Newaygo County Road Commission Ashland, Newaygo Cty.

Project Description

Expected Completion Date

12/1/2009

Route (Infrastructure Only)

3 Years

$

Alger Ave.

Indexing into the system documents that have been scanned but not indexed, for retrieval by the public and title companies for title searches to help constituents when purchasing real estate. This project would help get our systems up to speed and help in employing 1 or 2 employees. A much needed project. Immediately Construct to all weather standards by means of crush/shape to allow area agricultural operations to operate at normal legal load limits year around. 7/1/2009

9/1/2010

$

between 128th St. 625,000 & Moore Rd.

16th St.

Rehab road surface with addition of valley gutter to control erosion and to complete route to township park.

9/1/2010

$

between Elm Ave. 1,200,000 & Beech Ave.

Indexing

Submitted Requests - Not Approved

7/1/2009

380 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Newaygo County Road Denver Township, Commission Newaygo Cty. Garfield, Ashland, Newaygo County Road Bridgeton Township, Commission Newaygo Cty. Newaygo County Road Lincoln Township, Commission Newaygo County Newaygo County Road Newaygo County Road Commission Commission

Project Name

Project Description

Expected Completion Date

Start Date

Dickinson Ave.

Construct to all weather standards by means of crush/shape.

7/1/2009

9/1/2010

North River Dr.

Construct to all weather standards by means of crush/shape to allow area agricultural operations to operate at normal legal load limits year around. 7/1/2009

9/1/2010

Mundy Ave.

Construct roadway to newly designated county park.

7/1/2009

9/1/2010

Complex improvements

Improve energy efficiencies of building and complex

7/1/2009

9/1/2010

Fuel Facility

Onsite fueling facility that will allow all Newaygo County government entities to purchase fuel on a volume, wholesale pricing program saving thousands of dollars a month. 5/1/2009

New Shelter

In an attempt to make Newaygo County more attractive as a place to live, work and raise a family, we would like to construct a new Animal Shelter. The current shelter does not meet the needs of the county because of its age and size. By constructing a new shelter we could expand our operation and hold more animals and provide better service to the people of the County. This would ensure work during the time of construction and create the potential for added employees in the future for the shelter operation. March 1st, 2009

Route (Infrastructure Funding Request Only) between M-20 & 4 $ 800,000 Mile Rd. between City of Newaygo & Warner 750,000 Ave. between Foss & 5 1,500,000 Mile Rd.

D VE $

$

$

350,000

7/1/2009

$

230,000 n/a

November 31st, 2009

$

300,000

Newaygo District Court White Cloud, MI

Scan all District Court records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. Objectives: ease of access, increased efficiency, improved image quality. 2/15/2009

8/15/2009

$

27,000

Newaygo Probate Court

Scan all Probate Court records and documents to be used online by clients and staff. Clients can obtain data online for records from the 1970's until present, as well as file any approved documents electronically. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. Objectives: ease of access, increased efficiency, improved image quality. 2/15/2009

8/15/2009

$

27,000

6/15/2009 2010

$ $

27,000 10,000 Yes

7/1/2010

$

Newaygo County Road Newaygo County Road Commission Commission

Newaygo County Sheriff's Office

White Cloud

T O

P P A

O R

N s

t s e

u q e

R d

White Cloud, MI

e t tt

Court & Community Connectivity Initiative (CCCI)

i m

Newaygo Probate Court Newaygo Township

White Cloud, MI Newaygo

Connectivity Initiative Brooks/Hess Lakes

Scan all Probate Court records and documents to be used online by clients and staff. Clients can obtain data online for records from the 1970's until present, as well as file any approved documents electronically. An online user friendly database will be developed to provide such services regardless of the user's location. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. 2/15/2009 Brooks/Hess Lakes 2009

Niles Township

Niles Charter Township, Berrien County

Western Water System Expansion

Well, elevator storage, watermains

b u S

02262009

Submitted Requests - Not Approved

Aug. 1, 2009

4,250,000

381 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Niles Township

Niles Charter Township, Berrien County

Niles-Buchanan Watermain Ext.

16" D.I. Watermain extension

4/15/2009

Oct. 31, 2009

Nitin Amersey, Photo Artist NKSA

Saginaw NKSA

MBS Airport Project North Kent Sewer I/I Elimination

To provide large scale (5 foot and larger) photo art murals of the Tri-City Area (Saginaw, Midland, Bay City) for display in the new MBS Airport Terminal. North Kent Sewer I/I Elimination

2009

2010

Noordyk Broadcasting, Newaygo County, Inc. dba West Northwest Kent County, Michigan Broadband Northeast Ottowa County West Michigan Broadband North Adams-Jerome Public Schools

North Adams

building maintenance

adding a building control center to control heating and electrical usage

North Adams-Jerome Public Schools

North Adams

transportation center

updating of bus transportation center

North Adams-Jerome Public Schools

North Adams

entrance doors

upgrading entrance doors

North Adams-Jerome Public Schools

North Adams

lighting

North Adams-Jerome Public Schools

North Adams

roofing

North Adams-Jerome Public Schools

North Adams

earlier childhood center

North Adams-Jerome Public Schools

North Adams

building security

tt i m

P P A

O R

1,560,000

D VE

45,000 Yes

Phase 1 - 240 days max. Phase 2 - 365 days from funding

$

1,909,000

8/1/2009

Sept. 30, 2009

$

28,000

8/1/2009

Dec. 30 2009

$

420,000

6/1/2009

7/1/2009

$

7,500

upgrading lighting to T-5

6/1/2009

7/1/2009

$

12,500

elem. Building roofing

6/1/2009

8/9/2009

$

78,000

earlier childhood center

7/1/2009

Sept. 30, 2009

$

175,000

8/30/2009

$

65,000

q e R

N s

st

e u

d e t

$

$

It is our intent to build a high speed wireless broadband network for unserved, rural households in Newaygo County, Southeast Oceana County, Northeast Muskegon County, Northeast Ottawa County and Northwest Kent County. Based upon 2000 census data, this project will reach 67,665 people. This represents 24,065 homes. These households are not being served with high speed broadband service. This network shall be completed using a combination of existing tower structures and a series of new towers that will be seamlessly linked together. Our propagation studies indicate that we can use some existing tower structures. This will allow us to start construction within 30 days of funding. By utilizing existing structures, start up costs will be reduced and completion of this portion of the network will be within 240 days of funding. The 2nd phase of the project will require 4 new tower structures and shall be completed within one year of funding. Immediate

T O

Funding Request

adding exterior and interior surveillance cameras and electronic locks for exterior and interior locks 7/1/2009

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

382 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

The North Berrien Historical Museum plans on renovating the circa 1860 Carter House and grounds that is located on the museum property. The building currently stands empty and used only for a Holiday Open House weekend in December. An architectural report completed in 2008 found that little historic value was left in the building after a series of renovations had taken place between 1950 and 2005. The museum seeks to renovate the building to make it an accessible public space for programs and activities related to the region’s heritage. This green re-use of the site would created valuable community space both inside the building and outside on the grounds. The inside of the house would be renovated to include a handicap accessible washroom, updated plumbing, a small office, and a large multipurpose space. The lawns would be leveled and debris removed to create an outdoor park area to be used for outdoor events.

O R

Funding Request

D VE

North Berrien Historical Society Coloma Township

Carter House Renovation

North Central Michigan North Central Michgan College Petoskey MI College 49770 North Central Michgan College Petoskey MI

Renovation and addition to the chemistry and Priority #1 This is far more than a building renovation project request. This project is Addition - 5/09 Addition - 7/10 science building a workforce development initiative. Renovation - 7/10 Renovation - 12/11 $ 6/1/2009 (2) Sanitary riser renovation in Residence Hall 6/1/2010 9/2009 9/2010 $

Northeast Michigan Council of Governments (NEMCOG)

All in Northeast MI

Northern Michigan Broadband Cooperative

Acme, Acme Twp, East Bay Twp, Traverse City, Garfield Twp, Elmwood Twp, Long Lake Twp, Solon Twp, Kasson Twp, Empire Twp, Empire NMBC 21

Northern Michigan Broadband Cooperative

Acme, Acme Twp, Whitewater Twp, Kalkaska Twp, Excelsior Twp, Bear Lake Twp, Grayling

Northern Michigan Broadband Cooperative

Cadillac, Clam Lake Twp, Haring Twp, Richland Twp, Lake Twp, Reeder Twp, Caldwell Twp, Forest Twp, West Branch Twp, Aetna Twp, Butterfield Twp, Enterprise Twp, Nellsville NMBC 25

Northern Michigan Broadband Cooperative

Cadillac, Haring Twp, Ceddar Creek Twp, Liberty Twp, Fife Lake Twp, Boardman Twp, Kalkaska Twp, Kalkaska

Regional Broadband Project

s t s

e u

eq

R d

NMBC 19

ub

-N

Acme to Empire following M-72 for 31.9 miles

Acme to Grayling following M-72 to CR-612 to M-72 for 43.8 miles

n/a

$

8/1/2010

7/1/2010

9/1/2010

8/1/2010

Cadillac to Nellsville following M-55 for 33.7 miles

9/1/2010

10/1/2010

cadillac to kalkaska following US-131 for 39.3 miles

Submitted Requests - Not Approved

9/1/2010

10/1/2010

1,127,117

50,000,000

$

$

Fiber Optic buried in Conduit following 1,314,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,011,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,179,000 JULIET rules

S

NMBC 26

10,428,400

Fiber Optic buried in Conduit following 957,000 JULIET rules

e t tt

i m

02262009

T O

P P A

Fiber Backbone Deployment in Alcona, Alpena, Cheboygan, Crawford, Montmorency Oscoda, Otsego, Presque Isle Counties

Route (Infrastructure Only)

383 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Northern Michigan Broadband Cooperative

Charlevoix, Charlevoix Twp, Marion Twp, Eveline Twp, South Arm Twp, Jordan Twp, Warner Twp, Elmira Twp, Livingston Twp, Bagley Twp, Gaylord NMBC 16

Northern Michigan Broadband Cooperative

Charlevoix, Charlevoix Twp, Norwood Twp, Banks Twp, Torch Lake Twp, Milton Twp, Elk Rapids Twp, Acme Twp, Acme

Northern Michigan Broadband Cooperative

Empire, Empire Twp, Glen Arbor Twp, Cleveland Twp, Leland Twp, Leelanau Twp, Suttons Bay Twp, Bingham Twp, Elmwood Twp, Garfield Twp, Travers City NMBC 22

Northern Michigan Broadband Cooperative

Empire, Empire Twp, Platte Twp, Crystal LAke Twp, Gilmore Twp, Blane Twp, Arcadi Twp, Onekama Twp, Manistee Twp, Manistee NMBC 23

Northern Michigan Broadband Cooperative

Gaylord, Bagley Twp, Otsego Twp, Maple Forest Twp, Grayling Twp, Grayling NMBC 12

Northern Michigan Broadband Cooperative

Grayling, Grayling Twp, Beaver Creek Twp, Lyon Twp, lake Twp, Enterprise Twp, Nellsville NMBC 13

Northern Michigan Broadband Cooperative

Indian River, Tuscarora Twp, Mentor Twp, Ellis Twp, Nunda Twp, Corwith Twp, Livingston Twp, Baagley Twp, Gaylord NMBC 11

Northern Michigan Broadband Cooperative

Kalkaska, kalkaska Twp, Rapid River Twp, Custer Twp, Mancelona Twp, Star Twp, Warner Twp

02262009

S

ub

NMBC 20

Start Date

Charlevoix to Gaylord following M-66 to M-32 for 42.9 miles

NMBC 18

tt i m

Project Description

6/1/2010

Charlevoix to Acme following US-31 for 42 miles

-N

Empire to Northport to Traverse City following M-22 for 67.1 miles

e u

Empire to Manistee following M-22 to US-31 for 48.1 miles

q e R

Gaylord to Grayling following I-75 for 28.2 miles

d e t

Grayling to Nellsville following I-75 to US-127 to M-55 for 25.2 miles

Indian River to Gaylord following I-75 for 30 miles

Kalkaska to US-131 and M-32 near Elmira for 27.3 miles

Submitted Requests - Not Approved

7/1/2010

O R

P P A 7/1/2010

T O

s t s

Expected Completion Date

8/1/2010

8/1/2010

5/1/2010

5/1/2010

5/1/2010

7/1/2010

8/1/2010

9/1/2010

9/1/2010

6/1/2010

6/1/2010

6/1/2010

8/1/2010

Funding Request

Route (Infrastructure Only)

D VE $

Fiber Optic buried in Conduit following 1,287,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,260,000 JULIET rules

$

Fiber Optic buried in Conduit following 2,013,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,443,000 JULIET rules

$

Fiber Optic buried in Conduit following 846,000 JULIET rules

$

Fiber Optic buried in Conduit following 756,000 JULIET rules

$

Fiber Optic buried in Conduit following 900,000 JULIET rules

$

Fiber Optic buried in Conduit following 819,000 JULIET rules

384 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Northern Michigan Broadband Cooperative

Mackinaw City, Mackinaw Twp, Carp Lake Twp, McKinley Twp, Maple River Twp, Littlefield Twp, Springvale Twp, Bear Creek Twp, Petoskey NMBC 14

Northern Michigan Broadband Cooperative

Mackinaw City, Mackinaw Twp, Hebron Twp, Munro Twp, Burt Twp, Mullett Twp, Tuscarora Twp, Indian River NMBC 10

Northern Michigan Broadband Cooperative

Manistee, Manistee Twp, Stronch Twp, Norman Twp, South Branch Twp, Henderson Twp, Cherry Grove Twp, Cadillac NMBC 24

Northern Michigan Broadband Cooperative

Mio, Big Creek Twp, Mentor Twp, Comins Twp, Clinton Twp, Loud Twp, Avery Twp NMBC 09

Northern Michigan Broadband Cooperative

Petoskey, Bear Creek Twp, Resort Twp, Hayes Twp, Charlevoix Twp, Charlevoix

Northern Michigan Broadband Cooperative

Warner Twp, Boyne Valley Twp, Melrose Twp, Bear Creek Twp, Petoskey NMBC 17

Northern Michigan Broadband Cooperative

Alcona, Alpena, Antrim, B enzie, Charlevoix, Cheboygan, C rawford, Emmet, Grand Traverse, Kalkaska, Leelanau, Manistee, Missaukee, Montmorency, Oscoda, Ot sego, Presque Isle and Wexford counties. NMBC Backbone

Northern Michigan Broadband Cooperative

Alpena, Alpena Twp, Presque Isle Twp, Krakow Twp, Pulawski Twp, Rogers Twp, Rogers City NMBC 04

Northern Michigan Broadband Cooperative

Alpena, Wilson Twp, Green Twp, Rust Twp, Avery Twp, Briley Twp, Vienna Twp, Charlton Twp, Chester Twp, Gaylord.

Mackinaw City to Indian River following I-75 for 28.3 miles

Mio to M-32 following M-33 for 28.2 miles

02262009

s t s

T O

-N

e u

Petoskey to Charlevoix following US-31 for 17.1 miles

q e R

M-32 and US-131 near Elmira to Petoskey following Us 131 for 22.9 miles

d e tt

6/1/2010

9/1/2010

4/1/2010

6/1/2010

6/1/2010

Create a 958 mile GPON fiber optic backbone to connect health and emergency services, education, government and business entities, as well as under-served and unassigned areas in the northern Michigan region. 8/1/2009

Alpena to Rogers City following US-23 for 38.3 miles

Alpena to Gaylord following M-32 for 70.2 miles

Submitted Requests - Not Approved

7/1/2010

O R

P P A 5/1/2010

Manistee to Cadillac following M-55 for 52.7 miles

t i m

NMBC 01

Start Date

Mackinaw City to Petoskey following I-75 to US-31 for 36 miles

NMBC 15

b u S

Project Description

Expected Completion Date

8/1/2009

8/1/2009

6/1/2010

10/1/2010

5/1/2010

7/1/2010

7/1/2010

10/31/2011

9/1/2009

9/1/2009

Funding Request

D VE

Route (Infrastructure Only)

$

Fiber Optic buried in Conduit following 3,000,036 JULIET rules

$

Fiber Optic buried in Conduit following 849,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,581,000 JULIET rules

$

Fiber Optic buried in Conduit following 846,000 JULIET rules

$

Fiber Optic buried in Conduit following 513,000 JULIET rules

$

Fiber Optic buried in Conduit following 768,000 JULIET rules

$

Fiber Optic buried in Conduit following 32,538,036 JULIET rules

$

Fiber Optic buried in Conduit following 1,149,000 JULIET rules

$

Fiber Optic buried in Conduit following 2,106,000 JULIET rules

385 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Northern Michigan Broadband Cooperative

Cheboygan, Berton Twp, Aloha Twp, Grant Twp, Waverly Twp, North Allis Twp MNBC 06

Northern Michigan Broadband Cooperative

Harrisville, Harrisville Twp, Gustin Twp, Millen Twp, Mitchell Twp, Comins Twp, Elmer Twp, Greenwood Twp, Lovells Twp, Graying Twp, Grayling NMBC 08

Northern Michigan Broadband Cooperative

Harrisville, Harrisville Twp, Haymes Twp, Alcona Twp, Sanborn Twp, Alpena Twp, Alpena NMBC 03

Northern Michigan Broadband Cooperative

Onaway, Allis Twp, Montmorency Twp, Briley Twp, Altanta NMBC 07

Northern Michigan Broadband Cooperative

Rogers City, Rogers Twp, Moltke Twp, Ocqueoc Twp, Case Twp, Alis Twp, Forest Twp, Walker Twp, Ellis Twp, Koehler Twp, Tuscarola Twp, Indian River NMBC 02

Northern Michigan Broadband Cooperative

Rogers City, Rogers Twp, Ocqueoc Twp, Bearinger Twp, Berton Twp, Cheboygan, Beaugrand Twp, Mackinaw Twp, Mackinaw City NMBC 05

Northfield Township Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College

Northfield Township

Project Description

Start Date

Expected Completion Date

Cheboygan to Onaway following CR-F05 (Butler and N and S Black River Rds, M-33 and M-68 for 28.8 miles 8/1/2009

Harrisville to Grayaling following M-72, CR-608 and CR-F32 to M-72 for 78.1 miles

Harrisville to Alpena following US-23 to M-32 for 31.7 miles

T O

P P A 8/1/2009

9/1/2009

N s

st

e u

Rogers City to Indian River following M-68 to S Straits Hwy for 43.3 miles

d e t

Bridge for US23 and North Territorial

q e R

O R 5/1/2009

Onaway to Atlanta following M-68, M-33 and M-32 for 28 miles

Rogers City to Mackinaw City following US-23 for 56.8 miles Replace Bridge and ramps at US23 and North Territorial Intersection and improve intersections at the interchange of the two roads

4/1/2010

9/1/2009

8/1/2009

8/1/2009

8/1/2009

9/1/2009

9/1/2009

Funding Request

$

Fiber Optic buried in Conduit following 864,000 JULIET rules

$

Fiber Optic buried in Conduit following 2,343,000 JULIET rules

$

Fiber Optic buried in Conduit following 951,000 JULIET rules

$

Fiber Optic buried in Conduit following 780,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,299,000 JULIET rules

$

Fiber Optic buried in Conduit following 1,704,000 JULIET rules

D VE

$

18,000,000

NMC key management systems internal keys

$

25,000

NMC mass communication message alert system

$

35,000

NMC computer systems upgrades required to support technology

$

40,000

NMC HVAC Upgrades -- Observatory

$

50,000

NMC building PA systems

$

75,000

Traverse City

NMC HVAC upgrades -- Fine Arts

$

100,000

Traverse City

NMC HVAC upgrades -- Beckett

$

125,000

Traverse City

NMC HVAC updates - Dennos

$

150,000

itt

Traverse City

m b u

Traverse City Traverse City

S

Traverse City Traverse City

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

386 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Northwestern Michigan College Norway-Vulcan Area Schools Nottawa Community School

Novi Public Library

Location City or Township

Project Name

Start Date

Funding Request

Traverse City

NMC HVAC upgrades - University Center

$

175,000

Traverse City

NMC geothermal heating -- MTEC

$

200,000

Traverse City

NMC power house boiler replacement

$

250,000

Traverse City

NMC geothermal heating system- Dennos

$

300,000

Traverse City

NMC centralized building management system

$

350,000

Traverse City

NMC roof replacement East Hall

$

400,000

Traverse City

NMC offsite transit facilities (3)

$

450,000

Traverse City

NMC window replacements campuswide

$

525,000

Traverse City

NMC HVAC updates-Tanis Bldg

$

550,000

Traverse City

NMC buses (4)

$

1,000,000

Traverse City

NMC transit hub

$

2,000,000

Traverse City

NMC Leeds Platinum Certification

$

3,000,000

Traverse City

Northwestern Michigan College student learning center

$

14,000,000

e u

st

s

O R

A T

D VE

PP

O N

Route (Infrastructure Only)

Norway

Lighting Retrofit

Replace 800 T-12 flourescent lighting fixtures with T-8 flourescent fixtures.

June 8,2009

7/30/2009

$

96,000

Sturgis

Upgrade Internet capability in building

Purchase new server and go wireless.

28,000 yes

Novi

new Novi Public Library

tt i m

Oakland County Government

Project Description

Expected Completion Date

b u S

Oakland County, Michigan Wireless Oakland

02262009

d e t

6/1/2009

7/31/2009

$

A new 55,000 square foot library will be built to replace the existing 23,900 square foo library building. The new building will be constructed adjacent to the existing building on property already owned by the Library. The current facility will remain open, and service will continue there until the new building is completed and ready for occupancy. 2/9/2009

8/10/2009

$

17,542,667

Wireless Oakland is an initiative launched by County Executive L. Brooks Patterson that consists of three goals. The first goal is to blanket the County's 910 square miles with wireless internet service at a cost of $70 million to complete the build-out. Phase 1 covering 18.5 square miles is already in place. The second goal will directly address the County’s "digital-divide" and provide low-cost or no-cost PC's and technology training to underserved population groups. Finally, the third goal will develop a Telecommunication and Technology Planning Toolkit that will support continued hightech investments in local government and promote the integration of those investments with local community character and quality of life. The benefits of this initiative are nearly endless. Wireless Oakland will prepare the residents of the County for the jobs of tomorrow. As businesses go high-tech and more high-tech firms locate and relocate their businesses within the County, the residents of the County must be prepared to fill the jobs those businesses have to offer. Through its private sector partners(s), this initiative intends to provide “open-air” and “in-building” wireless interneImmediately

24 months from start date

$

70,000,000

q e R

Submitted Requests - Not Approved

387 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Oakland County Water Resources Commissioner Commerce Township

Project Name

Project Description

S2S control - Commerce Twp. under Water Technology Center of Excellence

Start Date

Demonstrate effectiveness of Wayne State Developed technology for eliminating hydrogen sulfide in Commerce sewage collection system.The Office of the Oakland County Water Resources Commissioner (OCWRC) will install and validate DynamOx, an innovative technology developed at Wayne State University, to eliminate the public health concerns and the structural damage expected from hydrogen sulfide generation in sewer systems. Hydrogen sulfide converts to sulfuric acid in collection systems and the resulting corrosion causes accelerated infrastructure degradation and often sewer collapses. OCWRC is responsible for operation of Commerce Township, Michigan which faces the problem of excessive hydrogen sulfide gas being formed within the plant causing human health concerns, odor problems, and contributing to the excessive corrosion of process piping and equipment. Hydrogen sulfide is poisonous and explosive; it ruins infrastructure. This first phase project will install a DynamOx system at a single location within the collection system that will allow accurate measurement of the down stream H2S concentrations both in solution and in the gase5/1/2009

T O

Oakland County Water Commerce Twp., Resources Farmington Hills, Detroit, H2Opportunities - Water Technology Center Commissioner Leonard. of Excellence

d e tt

Oakland County Water Resources Commissioner Farmington Hills

S

ub

02262009

t i m

O R

P P A

Initiate four water/Wastewater technology projects under the Michigan Center of Excellence Program - H2Opportunities (H2Opps) - H2Opps will leverage the operational knowledge of operating water and wastewater utilities, research capabilities of Michigan and business support services already established through the MDEC, Automation Alley, and the university Incubator system. H2Opps will provide access to operations and highly skilled professionals to identify, prototype, test, verify and ultimately purchase developing technology. These technology developers will have access to business support services already available through non-profit entities that focus on workforce and business development initiatives. Specifically, the H2Opps is requesting funding to initiate the following four projects: 1) EPC technology installation, validation, and regulatory acceptance in Lenard, Michigan. 2) Miya technology validation to measure the ability to measure, identify, prioritize, and repair water loss in water distribution systems in Farmington Hills. 3) DynamOx Hydrogen Sulfide Control Technology in Commerce Township, Michigan. 4 4/15/2009

Funding Request

Route (Infrastructure Only)

D VE

9/1/2010

$

2,000,000

5/1/2011

$

2,000,000

5/1/2010

$

5,000,000

N s

t s e

qu

e R

Miya - Water Loss under Water Technology Center of Excellence

Expected Completion Date

Identify and repair water loss in Oakland County community using Israeli technology leading to Michigan based operation Farmington Hills has been chosen to be the American Launch site of Miya, an innovative collection on internationally recognized companies now head quartered in Israel that target the identification, prioritization and elimination of losses in drinking water distribution systems. The technology is appropriate for all communities and provides rapid payback. Farmington Hills was chosen as an older urban areas that has a history of high water loss (i.e. the community pays for a lot of water that never makes it to a tap) and can be sufficiently isolated that reductions in water loss can be accurately measured. The Miya system will measure water flows throughout the distribution system, identify the areas with the largest losses, and repair and /or replace these “worst case” areas. The initial cost is quickly offset by on-going savings. Once documented, the procedure will be expanded through the local distribution area on an ongoing basis. 5/1/2009

Submitted Requests - Not Approved

388 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Install wastewater collection/treatment system and demonstrate Israeli technology in Leonard, Mi leading to establishment of Mi based operation.Leonard Michigan has been chosen to be the American Launch site of EPC, an innovative decentralized wastewater treatment technology developed in Israel. The technology is appropriate for small communities and is a cost effective way of aerobically treatment municipal wastewater when size constraints are problematic given the stringent effluent requirements. This first phase project will require constructing a collection system in on portion of Leonard, establishing appropriate discharge standards and locations, constructing a small, but full scale, EPC treatment system, and operating the system EPC - Leonard, Mi. Wastewater System under through out the two year demonstration period. Once the entire system has been Water Technology Center of Excellence proven, the rest of Leonard will be retrofitted to capture and treat their wastewater. 5/1/2009

Oakland County Water Resources Commissioner Leonard

Oakland County Water Resources Commissioner Oakland County

d e tt

2,500,000

Repair/restore major interceptor beyond the repairs required by the previous collapse This interceptor experienced a catastrophic failure and the cost of the repair was been just one of the ongoing financial disputes between Detroit Water and Sewage Department (DWSD) and their customers. This project allows an orderly transfer of ownership of the Macomb Oakland Interceptor from DWSD to a newly established drain board to oversee the long term operation and maintenance of the interceptor. The Project, while crucial on its own, is more important because it is a critical component needed to provide a global settlement of the long standing federal law suit in Judge Feikens’ court between the US EPA and the DWSD customers. Besides settling all financial claims, the agreement would satisfy the suburban concerns for transparency and governance as well as Detroit’s need to maintain ownership and numerical control of the Water Board. 5/1/2009

11/1/2011

$

200,000,000

Demonstrate the effeciveness of Israeli Biological Fuel Cell leading to Michigan Based operation. - The EMECFY technology is an Israeli technology that has the potential to be extremely disruptive to the wastewater market. It relies on natural biological processes and nano-technology membranes to directly generate electricity for wastewater. Furthermore, it eliminates the airborne carbon discharges and therefore would be an ideal candidate for carbon capture and trading. It works on municipal waste, agricultural waste, and food processing waste: all challenges to the state of Michigan. One kilogram of biochemical oxygen demand generates 1 kilowatt of energy. The potential for this technology is endless. EMEFCY has agreed to work with the Michigan Center of Innovative Water Technology to validate the process. The quickest and most conservative approach is to test the process within an existing wastewater treatment process, preferably with a very concentrated waste stream. The Center has identified a large dairy operation (CAFO) that is installing an innovative wastewater treatment system. This will give the technology a very large su 5/1/2009

Oakland International Academy

Detroit

t i m

5/1/2011

$

2,500,000

S

ub

8/15/2009

$

5,646,707

9/1/2009

$

7,260,000

7/1/2010

$

150,000

e u

st

Client owns and operates a Michigan Charter School, Oakland International Academy in Detroit, Michigan. The current school is at the client’s site: 8228 Conant Street. Oakland International Academy- Middle/ High Since the needs of the community are changing and the demand for the placement of students is increasing, the client wishes to increase the size of the school. School

Oakland Township

Oakland Township

Detroit Water System (DWSD)

Oakland Township

Oakland Township

Cranberry Lake Farm Subdivision

02262009

N s

Connect to the Detroit Water System (DWSD). The project involves the construction of 8-inch to 20-inch water main, meter structures, fire hydrants, and 500,000 gall storage facilities. 5/1/2009 Construct sanitary sewer lines and pumping facilities and connect to an existing wastewater treatment plant, 6/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

q e R

EMECFY - Biological Fuel Cell under Water Technology Center of Excellence

P P A

O R

Funding Request

5/1/2011

T O

Oakland County Water Multiple cities throughout Resources Oakland and Macomb Commissioner Counties Oakland Macomb Interceptor

Expected Completion Date

389 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Oakland Township

Oakland Township Oceana County Oceana County Office of Genesee County Sheriff Office of Genesee County Sheriff Office of Genesee County Sheriff Office of Genesee County Sheriff Office of the Macomb County Public Works Commissioner

Oakland Township, Oakland County

Project Name

Project Description

Start Date

Construct sanitary sewer lines and pumbing facilities and connect to an existing wastewater treatment plant. Currently, the homes are served by on-site sewage disposal systems which are in disrepair and are polluting adjancent Cranberry Lake (largest lake in the township).

Cranberry Lake Farm Subdivision

Expected Completion Date

6/9/2009

7/10/2009

$

1,500,000

$ $ $

7,260,000 400,000 650,000

$

280,538

6/30/2009

$

280,538

3/1/2009

6/30/2009

$

581,076

3/1/2009

6/30/2009

$

289,538

Connect to the Detroit Water System (DWSD). The project involves the construction of 8 inch to 20 inch water main, meter structures, fire hydrants, and 500,000 gallon storgae facilities. 5/9/2009

DWSD Runway Extension Property Acquisition Parallel Taxiway Construction

Genesee County

Financial Crimes Unit

Genesee County

Violent Crimes Unit

Expansion of the Financial Crimes Unit w/ addition of two (2) detective sergeants. Includes salary, vehicles, overtime, and equipment. The Violent Crimes Unit is asking for funding for two Detective Sergeants, including salary, benefits, vehicles and equipment.

Genesee County

Gangs & Drugs

Expansion of Federal Violent Crime Task Force to combat gang activity in Genesee County w/ addition of four (4) detective sergeants. Includes salary, vehicles, overtime, and equipment.

Genesee County

Vulnerable Adult and Abuse Investigator

Addition of 2 investigators for the Elder Abuse & Financial Exploitation Task Force.

Harrington Drain Cleanout

Remove silt, sediment, and clogging debris from the main channel beginning at the confluence with the North Brranch of the Clinton River an continuing upstream to the Utica Road crossing north of 14 Mile Road for a distance of approximately 5 miles. bid in 180 days

180 days

$

1,000,000

630 days

$

3,500,000

$

3,800,000

City of Fraser, Clinton Township

T O

P P A 3/1/2009

-N

Clinton, Macomb, Shelby Townships Middle Branch Clinton River Drain Cleanout

Office of the Macomb County Public Works Commissioner

Macomb Township

Construction of 600 feet of drain enclosure immediately adjacent to traffic lanes of Hal Road (M-59)

Office of the Macomb County Public Works Commissioner

540 days

$

25,000,000

Rehabilitation of each of the four, 30 year old, screw pumps and motors. Refurbishment of the electrical switch gear system. Replacement of the corroded wet well ventilation system. Improvements to the existing SCADA system to provide additional instrumentation and control. These SCADA improvements will better utilization of station operators during wet weather conditions. bid in 180 days

360 days

$

390,000

Martin Retention Treatment Basin Improvements

Rehabilitation of the existing flushing system to improve flushing, and to reduce resuspension of solids and the associated chlorine demand. Improvements to the existing SCADA system to provide additional instrumentation and control. These SCADA improvements will better utilization of station operators during wet weather conditions.

bid in 180 days

360 days

$

760,000

Chapaton Retention Treatment Basin Improvements

Segmentation of the basin to provide first flush capture, flow control and effective chlorination. This effort require the construction of two dividing walls and two flushing gates. Replacement of the existing flushing system to improve flushing, and to reduce resuspension of solids and the associated chlorine demand. Improvements to the existing chlorination system to provide better control of chlorine application rate, to effect better fecal coliform kill, and to control Total Chlorine Residual as required by NPDES Permit. bid in 180 days

360 days

$

3,275,000

itt

d e t

Bon Huer Pump Station Improvements

m b u

St. Clair Shores

S Office of the Macomb County Public Works Commissioner

St. Clair Shores

02262009

q e R

Construction of 3 miles of 48" and 1 mile of 42" sanitary sewer to provide a gravity outlet to Washington and Ray Townships. This project will eliminate a deficient pump station and force main currently owned by Washington Township. bid in 180 days

North Hayes Interceptor

St. Clair Shores

6/30/2009

e u

Gloede Drain Enclosure

Macomb Township

s t s

9/9/2009 7/10/2009 12/9/2009

O R

3/1/2009

Office of the Macomb County Public Works Commissioner

Office of the Macomb County Public Works Commissioner

D VE

Oakland Township, Oakland County Oceana County Oceana County

Remove silt, sediment, and clogging debris from the main channel beginning at the confluence with the North Brranch of the Clinton River an continuing upstream to the Mound Road crossing south of 24 Mile Road for a distance of approximately 15.5 miles bid in 180 days

Office of the Macomb County Public Works Commissioner

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

390 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Office of the Macomb County Public Works Commissioner

Project Name

Project Description

Start Date

Refurbishment of for two Fairbank Morse 2750 HP, 240 RPM, 3?, 601Amp, 4800 Volt, Synchronous Motors (# 1 and # 2) and one Fairbank Morse 72-inch, 6310X, Variable Pitch, Mixed Flow Pump (# 1) with support equipment modernization (hydraulic blade pitch control system, lubrication system, pump vibration and bearing temperature monitoring). Motor refurbishment includes rewinding of the exciter, stator and rotor windings; and abatement of the existing asbestos insulation in the motor windings. This 40 year old equipment provides stormwater pumping to control flooding. These stormwater pumps discharge to the Chapaton Retention Treatment Basin for control of CSO in accordance with NPDES Permit No. MI-0025585. Stormwater pumps # 2 and # 3, and motor # 3 are currently being refurbished. bid in 120 days

St. Clair Shores

Chapaton Storm Water Pump #1 Rehabilitation

Office of the Macomb County Public Works Commissioner

St. Clair Shores

This construction contract replaces the one original 500 gpm pump with two new pumps. Each new small pump will be rated at 1,000 gpm and will use a 30 hp motor. One pump will be placed in each of the two dry wells. Each of these pumps will be capable of pumping 100% of the maximum expected dry weather flow, based on flow monitoring data from the Project Performance Certification. These new pumps will utilize a separate header. The new header provides sufficient valving for reliable operation. The installation of this separate header allows easier and more cost effective maintenance of the existing intermediate weather pumps on the existing header. This project also provides long term cost savings through energy efficiencies Chapaton Dry Weather Pumps Replacement in the pumps, motors and header. bid in 30 days

Office of the Macomb County Public Works Commissioner

St. Clair Shores

Inspection of the 8 1/2 Mile Relief Drain

T O

Ojibwe Charter School Brimley/Chippewa

d e tt

ub

Old Redford Academy Detroit Old Redford Academy Detroit Old Redford Academy Detroit

02262009

t i m

Ojibwe Charter School

S

Expected Completion Date

s t s

P P A

-N

Physical inspection of approximately 10 miles of combined sewer tributary to the Chapaton Pump Station. Last inspection was completed over 25 year ago.

e u

bid in 30 days

The Bay Mills Indian Community is a rural reservation that at one time experienced low achieving educational levels, high unemployment, high incidences of health relate issues and limited resources. Through hard work and an optimistic world view, the community has now become a major provider of access to opportunities that developed the tribe into a provider of services for the region including the opening of a K-12 charter school on the reservation in 2003 as well as a tribally controlled community college in 1984. Many of these entities are currently housed in modular buildings and other dated facilities.The development of this modern (green) facility has been designed to meet the needs of the Ojibwe Charter School, Bay Mills Indian Community, Recreation Department, Senior Citizen Recreation Services, Child Development Center, Boys and Girls Club, History Department and Bay Mills Community College. This facility will house these organizations with the idea of collaborating programs and to enhance the scope of these projects. The collective goal of these entities is to maintain long term development and sustainability of comm 6/9/2009

q e R

Acquisition of adjacent vacant parcel, construction of athletic field and football stadium9/1/2009 Property acquisition and construction of a middle school- 29 classrooms, offices, cafeteria and gymnasium- 65,000 sq, ft 7/1/2009 Building addition to the existing high school- 11 classrooms, cafeteria, offices, parking lot- 20,202sq. Ft 4/1/2009

Submitted Requests - Not Approved

O R

Funding Request

Route (Infrastructure Only)

D VE

270 days

$

2,250,000

240 days

$

650,000

180 days

$

1,000,000

5/31/2011

$

12,676,200

5/1/2010

$

2,000,000

6/1/2010

$

8,000,000

9/1/2009

$

3,500,000

391 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Opera Grand Rapids Orion Township Orion Township

Grand Rapids, MI Orion Township Orion Township

Project Name

Project Description

Start Date

Betty VanAndel Opera Center Township Hall Sanitary Sewer Indoor Field House

The Betty Van Andel Opera Center is designed to house rehearsal space, practice rooms, education and public program rooms, costume shop, scenery and properties storage, Opera Grand Rapids’ offices and meeting spaces, along with catering and special event space. The design calls for a two-story, 14,000 sq. ft. building in the Uptown area of Grand Rapids, MI. The building is designed for Silver Level LEED certification and includes energy efficient lighting and HVAC systems; sustainable building products; maximum use of exterior light into the building through energy efficient glass; and storm water cleaning and site containment. Construction will be completed under sustainability guidelines using local products when possible. The Opera Center will free Opera Grand Rapids from having to locate, negotiate for, rent and equip temporary spaces for every production, saving hundreds of hours and thousands of dollars annually. It will provide a home for the Opera, facilitating its educational outreach with the goal of bringing the enjoyment and understanding of the art to a broader and more diverse audience. It will permit Opera Grand Rapids to be a 4/1/2009 Provide sanitary sewer to Township Hall and eliminate aging septic field Provide an indoor field house as an extension of Parks and Recreation

T O

Orion Township

Orion Township

Baldwin-Indianwood Water main

Complete water main loop in northwest portion of Twp increasing reliability and expanding service

Orion Township

Orion Township

Sunset Hills

Provide road maintenance and alleviate flooding of private property

Orion Township

Orion Township Orion Township

Orion Township Orion Township

Orion Township

Orion Township Orion Township

Orion Township Orion Township

s t s

Water main extension for southeast portion of the Twp

Odyssey Sanitary Sewer Extension Silverbell Sanitary Sewer

Sewer extension to expand development potential for vacant property and minimize expansion of septic fields Provide sanitary sewer for southeast portion of the Twp

e u

q e R

Water main extension to densely populated area currently on individual wells Provide a community center for the citizens of Orion Twp

Axford Drain - Miller Road

Baldwin Road Booster Station

Orion Township

Orion Township Orion Township Orion Township

Ash Township, Monroe County Orion Township Orion Township Orion Township

Orion Township

Orion Township

Orion Township

Orion Township

Orion Township

Orion Township

Orion Township

d e tt

Telegraph Road Sewer treatment Facility Township Meeting Space Amphitheater McConnell Park

t i m

10/1/2009

-N

Purchase sewer treatment facility on Labo and Telegraph Road to allow us to run sewer lines down Telegraph Road. This is the heart of our commercial and industrial zoned property. The location is a rural community of 10,000 septic tanks that are starting to fail requiring sewer treatment. 4/1/2009 Provide a meeting space for Township functions Provide an amphitheater at Civic Center Park Create Baseball/Softball Field in residential area for handicap accessible Pave existing gravel and extend Park access road to Baldwin for future park development and access Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property 5/1/2009

Orion Township Orion Township Orion Township Orion Township

O R

P P A

Silverbell - Kern Water main

Northeast Water main Loop Community Center

Expected Completion Date

July, 2009

Funding Request

Route (Infrastructure Only)

D VE $ $ $

2,250,000 600,000 700,000

$

Barn Meadow to Indianwood, east 950,000 2400 feet

$

1,000,000 Entire subdivision

$

Kaeleaf to Kern, Kern north 4700 1,200,000 feet

$ $

Hills at Indianwood 1,500,000 north to Odyssey 1,600,000 Kaeleaf to Kern

$ $

Miller, Conklin, Indian Lake, 2,600,000 Lapeer 4,000,000

$ $ $ $

3,725,000 250,000 400,000 500,000

$

Clarkston to 750,000 Baldwin Orion Road to 800,000 Detroit Blvd.

Booster station to alleviate low pressures at the northwest portion of the Twp

$

800,000

Judah Road Water main

Provide water main for homes adjacent to Judah Lake and loop the system

$

Orion Township

Giddings Road

$

Orion Township Orion Township

Judah Road Sanitary Sewer Waldon Road

Rebuild asphalt road to accommodate increased bus and truck traffic Provide sanitary sewer for residential homes adjacent to lake and increase development potential of vacant properties Asphalt road rebuilding for increased bus and truck traffic

1,000,000 Baldwin to Joslyn Waldon to 1,200,000 Silverbell

$ $

1,900,000 Baldwin to Joslyn 2,500,000 Joslyn to Lapeer

S

ub

02262009

Friendship Park Road

Submitted Requests - Not Approved

$

392 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Orion Township Orion Township

Fire Station

Orion Township

Orion Township

Police Station

Orion Township

Orion Township

Water Storage Facility

Orion Township Orion Township

Orion Township Orion Township

Grampian Drainage Township Vehicles

Orion Township

Orion Township

Joslyn-Baldwin Trail

Storm sewer to alleviate flooding at road intersections and private property Replace aging vehicles with alternative fuel vehicles Pedestrian Trail construction consistent with County wide trails plan to aid access to schools.

Orion Township

Orion Township

North Oakland Transit Authority

Purchase alternate fuel vehicles and upgrade bus garage for senior citizen transport

Orion Township

Orion Township

Stonegate Park Road

Provide access to the new Park that currently does not have public access

Orion Township

Orion Township

SRF Project Plan

Manhole and sewer rehab to remove inflow/infiltration to be under capacity

Orion Township Orion Township Orion Township

Orion Township Orion Township Orion Township

Nakomis Dam Replacement Brown Drain Regional Farmer's Market

Replace aging dam/bridge structure Clean out and restore the drain to alleviate flooding Acquire land to provide a facility to develop a regional farmer's market

Orion Township

Orion Township

Brown Road

Orion Township

Orion Township Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County Orion Township, Oakland County

Lower/Relocate CMS Gas Main

Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township Orion Township

02262009

Project Name

Start Date

$

Funding Request 3,200,000

$

4,000,000

$ $

Brown Road at 6,000,000 Giddings Road Orion Road to Paint 250,000 Creek 480,000

$

500,000 Baldwin to Joslyn

$

500,000

$

Squirrel Road to 500,000 Stonegate Park

D VE $

5/1/2009

O R

P P A

Route (Infrastructure Only)

$ $ $

1,700,000 Various locations Nakomis Road at 1,000,000 Indianwood Lake 2,500,000 3,000,000

Widen from 3 lanes to 5 lanes to promote business development Lowering/Relocate CMS Gas Main to open up development potential of vacant property Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet. Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet. Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet. Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet. Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet. Complete water main loop in northwest portion of Twp increasing reliability and expanding service. Barn Meadow to Indianwood, east 2400 feet.

$

4,000,000 Baldwin to Joslyn

$

20,000,000 Baldwin and Joslyn

Axford Drain - Miller Road

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to detroit Blvd.

Baldwin Road Booster Station

Amphitheater

T O

Baldwin-Indianwood Water main

Baldwin-Indianwood Water main Baldwin-Indianwood Water main

e t t

Baldwin-Indianwood Water main

it

Baldwin-Indianwood Water main Amphitheater

Axford Drain - Miller Road Amphitheater Axford Drain - Miller Road

$

$

950,000

$

1,345,000

$

1,750,000

$

2,290,000

$

2,695,000

$

3,235,000

$

3,640,000

$

4,180,000

$

400,000

$

800,000

Booster station to alleviate low pressures at the northwest portion of the Twp

$

800,000

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

$

1,075,000

$

1,210,000

$

1,480,000

$

1,615,000

eq

R d

Baldwin-Indianwood Water main Baldwin-Indianwood Water main

s t s

-N

e u

Baldwin-Indianwood Water main

m b u

S

Project Description Fire Station in Gingellville to update facility and increase response time Replacement of aging facility to centralized facility for greater response time and service 2.5 million gallon above-ground storage facility to increase reliability and reduce water rates

Expected Completion Date

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

Submitted Requests - Not Approved

5/9/2009

6/9/2009

7/9/2009

393 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County Orion Township, Oakland Orion Township County

Orion Township Public Lake Orion/Charter Library Township of Orion

Orion Township Public Library Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Baldwin Road Booster Station

Booster station to alleviate low pressures at the northwest portion of the Twp

$

1,885,000

Amphitheater

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

$

2,020,000

$

2,155,000

$

2,425,000

$

2,560,000

$

2,830,000

$

2,965,000

$

3,100,000

$

3,370,000

$

3,505,000

Axford Drain - Miller Road Amphitheater Axford Drain - Miller Road

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

Baldwin Road Booster Station

Booster station to alleviate low pressures at the northwest portion of the Twp

Amphitheater

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

8/9/2009

A T

Axford Drain - Miller Road Amphitheater

O R

Sept. 9, 2009

PP

Oct. 9, 2009

D VE

Axford Drain - Miller Road

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

Baldwin Road Booster Station

Booster station to alleviate low pressures at the northwest portion of the Twp

$

3,775,000

Amphitheater

$

3,910,000

Axford Drain - Miller Road

Provide an amphitheater at Civic Center Park Storm sewer to alleviate flooding of the road, sidewalks, driveways, and private property. Orion Road to Detroit Blvd.

$

4,045,000

Amphitheater

Provide an amphitheater at Civic Center Park

$

4,315,000

Orion Township Public Library Expansion & Renovation

To renovate 29,000 sq ft library and add 44,000 additional square feet to meet the current needs of the community for changes in technology, furnishings, and equipment. Design to include green technology for efficiency in operation and conservation of resources. Includes areas for adults, teens, senior citizens and children, meeting rooms for community use and enhancement of site to access wetlands and Polly Ann Trail.

e u

st

q e R

s

O N

Nov. 9 2009

Dec. 9, 2009

Sept. 2009

Sept. 2011

$

19,000,000

Equip the library with an RFID Tracking System to include: 2 self-checks; 3 corridor gates; 2 Didital Library Assistants; 6 months rental of a tag conversion station for the conversion of bar codes to RFID; 3 intelligent unlocking stations for media; 13 pad Orion Township Public Library RFID Tracking work stations; DVD/CD cases and tags; 170,000 book tags; 13,000 media tags; 1 C System series RFID automated book return. Sept. 2009

Nov. 2009

$

372,000

WaterWheel Court Bridge

$

200,000

Lenroy Valley Road

$

400,000

Big Creek Township

Park Road

$

500,000

Big Creek Township

Park Road Bridge (CR489)

$

600,000

Big Creek Township

Old 144 (CR490)

$

700,000

Big Creek Township

Coupland Road

$

800,000

Big Creek Township

Mapes Road (CR 487)

$

900,000

Lake Orion/Charter Township of Orion

m b u

itt

Big Creek Township

Big Creek Township

S

02262009

d e t

Submitted Requests - Not Approved

Route (Infrastructure Only)

394 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek Oscoda Co RC Big Creek

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Big Creek Township

Park Road (CR489)

$

1,000,000

Big Creek Township

Valley Road (CR 488)

$

1,100,000

Big Creek Township

Valley Road W.of Mapes

$

1,500,000

Big Creek Township

Mishler Road

$

1,800,000

Big Creek Township

Pierce Road

$

2,000,000

Big Creek Township

Zimowske road (CR489)

$

2,500,000

$

200,000

$

600,000

$

900,000

$

1,100,000

$

1,300,000

$

1,400,000

$

200,000

$

300,000

$

400,000

$

500,000

Abbe Road (CR601)

$

600,000

Helmer Lake Road

$

800,000

Perry Crk Road(CR614)

$

900,000

Kittle Road (CR614)

$

1,000,000

McCollum Lk Rd(CR607)

$

1,100,000

Kneeland Road

$

1,500,000

Weaver Road

$

3,100,000

Booth Road

$

200,000

Oscoda Co RC Elmer Elmer Township

Galbraith Road N/CR606

$

300,000

Oscoda Co RC Elmer Elmer Township

Kittle Road (CR614)

$

500,000

Oscoda Co RC Elmer Elmer Township

Bills Road

$

600,000

Oscoda Co RC Clinton Clinton Township

Steiner Road

Oscoda Co RC Clinton Clinton Township

Abbe Road

Oscoda Co RC Clinton Clinton Township

McCollum Lake Rd (CR607)

Oscoda Co RC Clinton Clinton Township

Island Lake (CR616)

Oscoda Co RC Clinton Clinton Township

Weaver Road

Oscoda Co RC Clinton Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins Oscoda Co RC Comins

Clinton Township

Bailey Road (CR610)

Comins Township

Oakes Road

Comins Township

Oakes Road E/Schmidt

Comins Township

Schmidt Road

Comins Township

Cedar Run Road

e t t

it

Comins Township

m b u

Comins Township Comins Township

S

Comins Township

Oscoda Co RC Elmer Elmer Township

02262009

st

s

O N

R d

Comins Township

Comins Township

A T

e u

eq

Comins Township

O R

Submitted Requests - Not Approved

PP

Route (Infrastructure Only)

D VE

395 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Oscoda Co RC Elmer Elmer Township

Kneeland Road

$

700,000

Oscoda Co RC Elmer Elmer Township

Galbraith Rd (CR614)

$

1,100,000

Oscoda Co RC Elmer Oscoda Co RC Greenwood Oscoda Co RC Greenwood Oscoda Co RC Greenwood Oscoda Co RC Greenwood Oscoda Co RC Greenwood Oscoda Co RC Greenwood Oscoda Co RC Greenwood

Elmer Township

Miller Road (CR608)

$

3,200,000

Greenwood Township

Vacationland Drive

$

200,000

Greenwood Township

Stickfort Road

$

500,000

Greenwood Township

Townline Road (CR485)

$

700,000

Greenwood Township

Mielke Way Road

$

800,000

Greenwood Township

Williams Road (CR605)

$

900,000

Greenwood Township

Moon Lake Subdivision

$

1,900,000

Greenwood Township

Miller Road (CR608)

$

3,100,000

$

100,000

$

300,000

$

400,000

$

500,000

$

600,000

$

800,000

$ $ $ $ $ $ $

1,100,000 120,000 200,000 300,000 450,000 1,200,000 1,500,000

Oscoda Co RC Mentor Mentor Township

Hughes Lake Road

Oscoda Co RC Mentor Mentor Township

Eggleston Road

Oscoda Co RC Mentor Mentor Township

Warbler Road

Oscoda Co RC Mentor Mentor Township

Curtisville Rd (CR604)

Oscoda Co RC Mentor Mentor Township

Old State Road

Oscoda Co RC Mentor Mentor Township

Curtisville Rd (CR604)

Oscoda Co RC Mentor Mentor Township Oscoda County Oscoda County Oscoda County Oscoda County Oscoda County Oscoda County Oscoda Township, Iosco Oscoda Township County

Oscoda Township

Oscoda Township

Oscoda Township Oscoda Township

S

Oscoda Township, Iosco County

Oscoda Township, Iosco County Oscoda Township, Iosco County

02262009

A T

s

st

e u

eq

PP

O N

R d

Curtisville Rd (CR604) Handicap upgrade for the fair grounds Bridge over river at 489 and 33 for ATV/Snowmobiling Broadband for county Luzerne Fire - New Bldg. New Courthouse and Jai Sewer and water north of town Water Distribution Main Pipeline - Extend a section of main pipeline - serving airport industrial park properties. 6/30/2009

12/31/2009

$

60,000

Downtown Streetscape

Downtown' / 'Central Shopping' District - Continue / extend on-going initiatives that involve makeover of sidewalks, decorative streetlight fixtures and green spaces within the Downtown. 6/30/2009

9/30/2010

$

450,000

Industrial Park Expansion

Oscoda - Wurtsmith Industrial Park - Infrastructure extension / completion. Demolish vacant decaying buildings. Survey & Platting. Extend road and utility infrastructure. Install gateway and 'way-finding' signage. 6/30/2009

6/30/2010

$

1,600,000

Sewage Treatment Plant

Oscoda - Wurtsmith Sewage Treatment Plant - Modifications for Industrial Sludge & Septage Treatment capabilities. Install lagoon aerators and seepage bed dosing equipment.

6/30/2009

9/30/2010

$

1,800,000

Sewage Collection System

Lift Station #4 - Wet Well Improvements. Lift Station #5 - Corrosian Control

6/30/2009

9/30/2010

$

200,000

e t tt

i m

Public Water System Extension

ub

Oscoda Township, Iosco County

O R

D VE

Submitted Requests - Not Approved

Route (Infrastructure Only)

396 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Public Works - Building & Grounds Maint. Facility. Expansion, Insulation, Heating & Electrical Improvements. Community Center - Install Insulation, Roof and Exterior Siding.

6/30/2009

6/30/2010

Sanitary Sewer, Pump Station and Force Main, 6th St at W. Main to KL Ave & 8th Sanitary Sewer, Chime St Trailway, H Avenue from 9th to 10 Street Sanitary Sewer, Beech Ave Atlantic Ave. Sanitary Sewer Trailway, 9th Street from West Main St. to H Avenue Trailway Extension, Van-Kal Trailhead to West Main St Sanitary Sewer, Whitegate, Castleton, Lamplighter & Powerhorn Sanitary Sewer, Fairgrove,Mansfield, Wildemere & Strathmore 10th St Sanitary Sewer, Pump Station and Force Main S. 6th St Sanitary Sewer, Stadium Drive to N Ave. Trailway, 9th Street from Stadium Dr. to West Main St.

8/1/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

11/15/2010 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 5/1/2010 11/15/2009 11/15/2009

Non-Motorized Enhancements, West Main St, Maple Hill, Croyden, Drake & Stadium S. 11th St Sanitary Sewer KL Ave Sanitary Sewer 8th St to 9th St. Sanitary Sewer Pump Station Force main and Collector System, Skyridge, Driftwood, Westview & Mandalay Parkview Sanitary Sewer Multiple plat roads off Lodge Lane entryway H Ave Sanitary Sewer, 6th St to 9th St H Ave Sanitary Sewer and Pump Station East of 9th St West Port Plats, southern portion, below Torrington Rd Water Main, Technology Dr to N. Ave. S. 11th St Public Water Atlantic Ave. Public Water Oshtemo Trace Public Water 5th St, Gibbs and Frie Ave Public Water Extension (loop) W. Main Public Water (North Side) 2nd St. to 5th St. 8th St Public Water ML Ave. Public Water

5/15/2009 5/15/2009 5/15/2009

11/15/2009 11/15/2009 11/15/2009

$ $ $

5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 3/1/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

5/1/2010 11/15/2009 11/15/2009 11/15/2009 5/1/2010 11/15/2009 4/30/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009 11/15/2009

$ $ $ $ $ $ $ $ $ $ $ $ $ $

938,000 1,200,000 1,464,000 1,800,000 2,100,000 2,200,320 75,100 129,000 132,000 133,400 221,400 382,800 655,200 683,100

Charles Brink Road (Krys to end)

$

540,000

McCoy Road - Krys to M-32 (east leg of I-75 crossing access)

$

2,500,000

Wilkinson Road - M32 to Treetops

$

2,400,000

Mankowski Rd. Extension to Home Depot

$

237,781

East & West Main St. Sewer

$

337,062

O'Rourke Blvd.

$

400,000

City of Gaylord

N. Otsego, N. Court, Mitchell Streets (water/sewer/street)

$

1,752,684

City of Gaylord

Van Tyle to S. Wisconsin I-75 Crossing

$

4,000,000

City of Gaylord

South Otsego Project Pedestrian Road & Streetscape Improvements

$

7,250,000

City of Gaylord

Waste Water Treatment Plant Expansion

$

7,300,000

Oscoda Township

Oscoda Township, Iosco County

Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township

Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township

Oshtemo Township Oshtemo Township Oshtemo Township

Oshtemo Township Oshtemo Township Oshtemo Township

W Main St Sanitary Pump Station Chime St Sanitary H Ave Trailway Allenwood Sanitary Atlantic Ave. Sanitary Sewer 9th St Trailway North of W Main 10th St Trailway Whitegate Farms Sanitary Fairlane Sanitary 10th St Sanitary Pump Station 6th St. Sanitary Sewer 9th St Trailway South of W Main West Main Street Non-motorized Enhancements 11th St. Sanitary Sewer KL Ave Sanitary Sewer

Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance Otsego Co Economic Alliance

Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township Oshtemo Township

Sky Ridge Sanitary Parkview Sanitary Sewer Country Club Village Sanitary H Ave. 6th St. to 9th St. Sanitary Sewer H Ave. Sanitary Pump Station West Port Sanitary Sewer Technology Dr Water 11th St. Water Main Atlantic Ave. Water Main Oshtemo Trace Water Main 5th St., Gibbs & Frie Ave. Water Main W. Main Water Main 8th St. Water Main ML Ave. Water Main

Energy Efficiency Improvements

S

City of Gaylord

02262009

e t tt

i m

ub

City of Gaylord

s

t s e

O N

u q e

R d

Bagley Township Bagley/Chester Townships Bagley/Livingston/Dover Township City of Gaylord

A T

Submitted Requests - Not Approved

PP

O R

$

850,000

D VE $ $ $ $ $ $ $ $ $ $ $ $

Route (Infrastructure Only)

3,035,000 154,000 200,000 288,000 295,000 400,000 570,000 630,000 686,000 690,000 694,000 700,000

W. Main KL Ave H Ave Atlantic Ave 9th St 10th St

10th St 6th St 9th St W. Main St Drake 761,000 Road Stadium Dr. 773,000 11th St 860,000 KL Ave

Parkview H Ave H Ave

11th St Atlantic 5th St W. Main 8th St ML Ave

397 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Otsego Co Economic City of Gaylord/Bagley Alliance Township Otsego Co Economic City of Gaylord/Bagley Alliance Township Otsego Co Economic City of Gaylord/Bagley Alliance Township Otsego Co Economic City of Gaylord/Bagley Alliance Township Otsego Co Economic Alliance Corwith Township Otsego Co Economic Alliance Elmira Township Otsego Co Economic Gaylord/Bagley/Livingston Alliance Township Otsego Co Economic Alliance Hay Township Otsego Co Economic Alliance Hay Township Otsego Co Economic Alliance Livingston Township Otsego Co Economic Alliance Livingston Township Otsego Co Economic Livingston/Elmira Alliance Township Otsego Co Economic Alliance Otsego Lake Township Otsego Co Economic Alliance Otsego Lake Township Otsego Co Economic Vanderbilt/Corwith Alliance Township Otsego Co Economic Vanderbilt/Corwith Alliance Townships

Otsego County

Bagley Township

Project Name

02262009

$

552,033

Dickerson Rd. - Van Tyle to West Otsego Lake Drive

$

900,000

$

1,100,000

$

3,000,000

$

700,000

$

500,000

$

2,400,000

$

1,094,000

$

1,280,000

$

450,000

$

1,035,000

$

650,000

$

900,000

West Otsego Lake Drive (Mancelona to Cottage Tr.)

$

1,280,000

Vanderbilt Streetscape

$

500,000

$

4,500,000

O R

Alexander Road Elmira Streetscape West M-32 Streetscape and Pathways

A T

Hay Tower Road - Balance Mancelona Road (Hay Tower to WOL Dr.) Meecher Road Poquette Road

s

North Townline (Allis to Theisen Rds.)

st

PP

O N

Marlette & Sherman Roads - Waters Landfill Access

e u

eq

Vanderbilt Water System (storage & distribution system)

Otsego County Jail

Otsego County Library Expansion

Construct a new 68-bed County Jail. The County has just completed a two-year process, culminating in a Citizen Jail Committee recommending the construction of this facility on currently owned County land. The County could provide a $200,000 match.

R d

e t tt

Funding Request

McVannel Road Extension to Van Tyle

I-75 Ramps @ New I-75 Crossing

b u S City of Gaylord

Start Date

Milbocker Road - S. Townline to New I-75 Crossing

i m

Otsego County

Project Description

Expected Completion Date

D VE

7/1/2009

7/1/2011

$

8,000,000

Otsego County is proposing a 15,700 sq. ft. expansion of its main library in the heart of the City of Gaylord. Since 1985 the current facility has been a centerpiece of our rural community as a cultural and educational destination, but rapid growth has far surpassed the original design population and space needs are critical. Library statistics consistently surpass state averages, yet our 9,031 sq. ft. library is just half the recommended size for our current census. The building program is based on a well-documented study which identified community needs through public input. The expansion will take the library into the next 25 years with space for expanded collections and programs, new technologies, increased access to public computers, and training and group rooms. It will bring the community in line with per capita space allocation as recommended by the Library of Michigan’s Quality Services Checklist and accommodate a level of service to meet needs of a growing number of families, students, small business owners, and jobseekers facing difficult times. The expansion plan provides an appropriate long term vision for new developments in tech7/1/2009

7/1/2010

$

4,500,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

398 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Otsego County

Otsego County

Livingston Township

Bagley Township

Project Name

Project Description

Start Date

Expected Completion Date

University Center at Gaylord Science & Technology Expansion

The University Center at Gaylord is seeking a Building Construction Grant. The locally owned University Center is centrally located within the state, serving the Northern Third of Lower Michigan by providing extended learning and higher education for this rural area. The grant will be used to add an Applied Research and Development Center focusing on entrepreneurship and innovation in the fields of Science, Technology, Engineering and Mathematics (STEM). The grant is being sought in collaboration with Lake Superior State University (LSSU), our STEM partner and anchor four year state university. The LSSU College of Science, Technology, Engineering and Mathematics houses several nationally accredited programs and LSSU was recently awarded a designation as a SmartZone in collaboration with the city of Sault Ste. Marie. This collaboration between the Gaylord University Center and LSSU, with the addition of this new facility, will be the last step in moving the K-16 educational emphasis of the region away from traditional auto dependent manufacturing, to one encouraging innovation and entrepreneurship in the region by fo3/1/2009

Otsego County Animal Control Bldg

This is for construction of a new Animal Control Facility, on currently owned County property, to replace the existing out-dated, under-sized facility. The County can provide a $80,000 match.

Otsego Lake County Park Restroom Facility

P P A

O R

Funding Request

D VE

4/1/2011

$

15,000,000

5/1/2009

5/1/2010

$

800,000

Otsego County Parks and Recreation has in their current 5 year State and County approved Community Recreation Plan (2006-2010) a need for a new restroom facility at the Otsego Lake County Park. The County can provide a $6,250 match. In 1990 the Otsego Lake County Park was a 40 site rustic campground. The campground was only full on Fourth of July weekend. Presently, the Otsego Lake County Park is an 80 site modern campground that is full every weekend from Memorial Day through Labor Day as well as 60 % occupancy during the mid week. Otsego Lake County Park has 0ver 40,000 users each year. During special events such as Seaplane Splash In, Big Ticket Concert, fourth of July fireworks, and the Halloween weekend, two of them, we must rent porta johns because of the demand. Otsego Lake County Park is a definite revenue stimulus for Otsego County. A Northern Michigan Community that can not survive without tourism. A new modern restroom facility has been needed for a long time. The facility would consist of 4 female and 4 male restrooms, 3 female and 3 male lavatories, 4 unisex showers, and a male and female 4/1/2009

9/1/2009

$

250,000

A new snow blower is requested to keep the runways of the Gaylord Regional Airport free of obstacles that would impede aeronautic operations. The Snow Blower would greatly minimize the potential for an airfield hazard resulting from an average snow fal of 153.3” per year which the current blower strains to keep up with. This purchase would replace our existing 1978 SMI snow removal vehicle which has operated longer than it was feasibly intended. The requested replacement blower Model # H2723B from OSHKOSH of Wisconsin would come with the U.S. manufacturer’s warrantees and technical support. This would elevate the recurring cost of major maintenance that the current equipment requires in repairs. This substantial investment in the infrastructure of the Airport an estimated $700,000 will insure a safe and functional facility for the next 25 years. Upon receiving this new equipment we can promote to surrounding airports and communities that may have a need for a similar product the quality of “Made in America” workmanship by holding a media event for the unveiling. 4/1/2009 Gaylord Regional Snow Removal Equipment The County can provide a match of $50,000.

9/1/2009

$

700,000

T O

Route (Infrastructure Only)

N s

t s e

Otsego County

Bagley Township

u q e

R d

e t tt

i m

Otsego County

b u S

Bagley Township

02262009

Submitted Requests - Not Approved

399 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Gaylord

This is for the renovation of the County Courthouse property, consisting of one full block in the center of downtown Gaylord's Main Street. Updgrades would include a splash park, café sitting area, a modern kiosk, paving for a group gathering space, renovation/upgrades to an existing Veteran's monument, and numerous plantings of indigenous northern trees. These improvements are expected to bring potential retail Otsego County Courthouse Downtown Open consumers to the dowtown retail district. The County can provide a $80,000 match fo Space/Park Improvement this project. 4/1/2009

Otsego County

City of Gaylord

Sportsplex Multi-Purpose Room Project

The project would place a 48’ x 100’ addition onto the back of the current Otsego County Sportsplex building. This addition would include a 24’ x 48’ meeting room as well as a 60’ x 48’ activity room. The goal of this addition is to supplement to current activities we offer, swimming and skating, with other, low cost activities. One of the most frequently asked questions we receive is “do we offer exercise classes.” The meeting room will allow us to offer low cost classes to students of all ages. We currently host a senior’s exercise group that uses our lobby. We also have a cheerleading group that practices in our lobby that would move to this room. The activity room would include batting cages, an indoor golf practice net, as well as a surface that would allow for indoor soccer on a small scale. This multi-purpose surface would also be used by the local spring sports teams for winter training. The Sportsplex was constructed, and continues to be partially supported by taxpayers’ money. Our goal is to continue to offer the county residents low cost recreation activities. This addition would allow us to provide multiple activities for people of all ag5/1/2009

Otsego County Otsego County Otsego County Otsego County Otsego County Otsego County Otsego County Otsego County

City of Gaylord

Sportsplex Tennis Court Project

Otsego Township

Otsego Township

12th St. Lift Station & Sanitary Sewer

Otsego Township

Otsego Township

McPherson Water Main Loop

Otsego Township

Otsego Township

Meijer Water Main Loop

Otsego Township

Otsego Township

Otsego Township

Otsego Township

Walgreens Water Main Loop Cross Oaks and Van Bruggen Water Extensions

Otsego Township

Otsego Township

Otsego County

Otter Lake Area Historical Society Village of Otter Lake Overisel Township Oxford Charter Township Oxford Charter Township

T O

9/1/2009

itt

d e t

m b u

D VE $

750,000

5/1/2010

$

160,000

9/1/2009

$ $ $ $ $ $ $ $

125,000 125,000 175,000 750,000 800,000 3,000,000 4,500,000 8,000,000

11/15/2009

$

672,000

11/15/2009

$

48,000

11/15/2009

$

60,000

11/15/2009

$

72,000

O R

-N

4/1/2009

e u

q e R

Funding Request

12th Street lift station replacement and generator and gravity sewer / force main 5/15/2009 Construct 500 L.F. of 8” water main to loop the dead end line behind McPherson back to M-89 and 13th Street. 6/15/2009 Construct 450 L.F. of 8” water main to loop the water main east of 12 Street and M-89 (near US-131) back to the loop at Meijer. 6/15/2009 Construct 850 L.F. of 8” water main to close the dead-end at Walgreens with the dead end behind Tractor Supply / Home Depot. 6/15/2009 Construct 3,800 LF of 8" water main in existing residential area

6/15/2009

11/15/2009

$

325,000

12th Street and 103rd Avenue Water Loop

Construct 3,100 LF of 12" water main loop

6/15/2009

11/15/2009

$

350,000

Village of Otter Lake Overisel Township, Allegan County

History in Progress

Building addition to Museum, including restrooms in lower level, and solar lighting around perimeter This project will include update such as the 2 restrooms, well, sewer, updated heating and cooling.

3/9/2009

8/9/2009

$

196,000

$

148,000

Oxford Township

M-24 Safety Path

11/1/2010

$

150,000

Oxford Township

Parks and Recreation Golf Course

11/1/2011

$

3,000,000

S

02262009

Overisel 144th Ave. Culvert, LH 4501

Replace 90" round CMP culvert, 100' long with a 96" round concrete culvert 111' long. To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle 11/1/2009 To purchase an existing golf course and potentially utilize the clubhouse as a community center 11/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

This is for construction of four tennis courts along with associated lighting for the Otsego County Sportsplex. The Sportsplex would provide a $3,125 match. Sportsplex - Four new Tennis Courts and Lighting New Park Restroom Facility for Otsego Lake Park County Courthouse Open Space/Park Improvements New Animal Control Facility Airport Fire & Rescue Library Expansion New Jail

s t s

Expected Completion Date

400 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Oxford Charter Township Oxford Township Oxford Charter Township Oxford Township Oxford Charter Township Oxford Township

Project Name

Project Description To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

East Drahner Road Safety Path Ray Road/M-24 Safety Path Grampian Road Safety Path

Oxford Charter Township Oxford Charter Township

Oxford Township

Manitou Lane Water Main

Oxford Township

Oxford Charter Township

Start Date

Expected Completion Date

Funding Request

9/1/2009

12/31/2009

$

100,000

11/1/2009

11/1/2010

$

200,000

9/1/2009

12/31/2009

$

100,000

$

250,000

$

500,000

As soon as funds are released. 12/31/2009

West Drahner Road Safety Path

Installation of a new water main to provide water system redundancy and improved water quality to residents To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

Oxford Township

South M-24 Water Main

Installation of a new water main to provide additional capacity and better fire protection to the businesses on M-24

As soon as funds are released. 12/31/2009

Oxford Charter Township

Oxford Township

Drahner-Lakeville Water Main Loop

Oxford Charter Township

Oxford Township

Oxford Township

Mt. Morris Charter Township, Genesee County

Oxford Township

Oxford Charter Township, Oakland County Lakeville Water Main

Installation of a new water main to provide treated water on the eastern edge of the Township's Water District

Oxford Township

Oxford Charter Township, Oakland County Drahner-Lakeville Water Main Loop

Oxford Township

Oxford Charter Township, Oakland County South M-24 Water Main

Oxford Township

Oxford Charter Township, Oakland County Manitou Lane Water Main

Oxford Township

Oxford Charter Township, Oakland County East Drahner Road Safety Path

Oxford Township

Oxford Charter Township, Oakland County West Drahner Road Safety Path

Oxford Township

Oxford Charter Township, Oakland County M-24 Safety Path

Oxford Township

O R 12/31/2009

D VE $

700,000

Installation of a new water main to provide water system redundancy and improved water quality to residents

PP

As soon as funds are released. 12/31/2009

$

750,000

Lakeville Water Main

Installation of a new water main to provide treated water on the eastern edge of the Township's Water District

As soon as funds are released. 12/31/2009

$

800,000

Stanley Road Pump Station Re-route

Construction of gravity sewer from Stanley Road pump station to the new 72-inch Northeast Extension Sewer (constructed summer 2006), this will eliminate the need for a pump station at Stanley Road and I-75. Stanley Road.

3/9/2009

$

400,000

As soon as funds are released. 12/31/2009

$

800,000

Installation of a new water main to provide water system redundancy and improved water quality to residents

As soon as funds are released. 12/31/2009

$

750,000

Installation of a new water main to provide additional capacity and better fire protection to the businesses on M-24

As soon as funds are released. 12/31/2009

$

700,000

Installation of a new water main to provide water system redundancy and improved water quality to residents

As soon as funds are released. 12/31/2009

$

250,000

To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

9/1/2009

12/31/2009

$

100,000

12/31/2009

$

500,000

e u

st

eq

s

O N

R d

e t t

t i m

A T

ub

To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

5/10/2009

To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

11/1/2009

11/1/2010

$

150,000

Oxford Charter Township, Oakland County Grampian Road Safety Path

To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

9/1/2009

12/31/2009

$

100,000

Oxford Township

Oxford Charter Township, Oakland County Ray Road/M-24 Safety Path

To provide a safe pedestrian route for residents to run/walk/bike and promote a healthy lifestyle

11/1/2009

11/1/2010

$

200,000

Oxford Township

Oxford Charter Township, Oakland County Parks and Recreation Golf Course

To purchase an existing golf course and potentially utilize the clubhouse as a community center

11/1/2009

11/1/2011

$

3,000,000

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

401 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Packard Motor Car Foundation Packard Motor Car Foundation Packard Motor Car Foundation Packard Motor Car Foundation Packard Motor Car Foundation

Shelby Township

Park Township Park Township Park Township Park Township Park Township Park Township Park Township Park Township Park Township Park Township

Start Date

Packard Proving Grounds Restoration Packard Proving Grounds Restoration

Storm Drains: Clean and repair existing storm drains

Packard Proving Grounds Restoration

Packard Proving Grounds Restoration

Repair Garage: Interior storm windows Landscaping: (1)Evergreens along north and south property lines to screen adjacent commercial property, (2)Decorative landscaping throughout site Reconstruction of Utility Garage: Rebuild former storage garage on existing concrete slab

Packard Proving Grounds Restoration

Relocated Hangar Building: (1)Water main construction for fire suppression, (2)Sanitary sewer for domestic use, (3)Floor construction, (4)Waterproofing the roof, (5)Install insulation, (6)Ceiling construction, (7)Install HVAC and plumbing

Packard Proving Grounds Restoration Ottawa County/Park Twp., Ottawa County County Wide Wireless Park Township, Ottawa County Airport Improvements Park Township, Ottawa County Fish Cleaning Station Park Township, Ottawa County Drain Improvements Park Township, Ottawa County Airport Improvements Park Township, Ottawa County Airport Improvements Park Township, Ottawa County Airport Improvements Park Township, Ottawa County Airport Improvements Park Township, Ottawa County Airport Improvements Park Township, Ottawa County Airport Improvements

02262009

Project Description

Gate Lodge: (1)Electrical system replacement, (2)Heating renovation, (3)Fire suppression upgrade, (4)Air conditioning installation, (5)Plumbing repairs, (6)Interior storm windows, (7)Storm doors, (8)Install ceiling insulation in attic 3/1/2009

Packard Proving Grounds Restoration

Packard Motor Car Foundation

Packard Motor Car Foundation

Project Name

b u S

tt i m

d e t

Expected Completion Date

T O

11/30/2009

O R

s t s

provide wireless services to residents of the county

P P A June, 2009

Within 180 days

Obstruction & Tree Clearing Phase I (Rwy 5)

e u

Provide utilities to Fish Cleaning Station

$

D VE

Existing Pavement Repair and New Pavement Construction: (1)Clean and seal all concrete paving joints, (2)Remove and replace existing asphalt on entrance and exit drives, (3)Remove and replace failed concrete areas, (4)Resurface existing driveway to Hangar, (5)Resurface existing driveway to the west of the Engineering Building, (6)New asphalt pavement north of the Repair Garage, (7)Construction of new 200-car parking lot west of the Engineering Building

-N

Funding Request

870,000 NA

$

6,500

$

30,000

$

60,000

$

65,000

$

125,000

$

234,000

$

22,000

$

56,000

June, 2009

Within 270 days

$

100,000

June, 2009

Within 2 years

$

3,000,000

Obstruction & Tree Clearing Phase II (Rwy 23)

$

54,000

Acquisition of Avigation Easements

$

131,000

q e R

expand drainange system to reduce flooding issues along Estate Drive.

Acquisition of Avigation Easements

April, 2009

in 5 year plan

$

148,600

Development of Airport Layout Plan

April, 2009

in 5 year plan

$

5,000

Approach Survey

April, 2009

in 5 year plan

$

5,400

$

150,000

Runway Resurfacing

Submitted Requests - Not Approved

Route (Infrastructure Only)

402 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Park Township Pavilion Township

Park Township, MI Pavilion Township

Runway Reconstruction S Ave. Sanitary Sewer

Pavilion Township

Pavilion Township

Kilgore Rd./"N" Ave. Sanitary Sewer

Start Date

Existing runway and taxiway pavements have deteriorated and are in need of reconstruction. Airport provides a valuable transportation link and is a vital part of the community; however it is ineligible for federal funds. Existing pavement will be pulverized and used as base for new pavement. Existing navigational lighting aids along runway will be added and existing fixtures replaced with updated ones which will provide a safer more energy efficient system. There is currently a demand for private companies to build additional hangar buildings for aircraft storage. There is currently no suitable location to build these hangars. The apron area will be expanded to allow for additional hangars to be built. Project will create temporary construction jobs and preserve jobs that are currently tied to the airport. The continuing deterioration of this pavement will soon begin to limit operations and cause people to relocate to another area. 5/1/2009 Construct sanitary sewer along "S" Avenue 6/15/2009 Extend sanitary sewer along Kilgore Rd/East N Ave to serve businesses and residents 5/15/2009

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

8/1/2009 11/15/2009

$ $

11/15/2009

$

600,000

The Paw Paw Lake Area WWTP was constructed in 1973 and is an activated sludge treatment process with first and second stage trickling filters. Overall, the plant has been well maintained but does utilize outdated equipment throughout various stages of the treatment process. After an operational review, it was determined that the most effective way to further improve the plant performance is to install a modern headworks system, thereby preventing screenings and other debris from reaching downstream systems. This is the primary portion of the proposed project, including a new screen, grit collection system, and influent/flow monitoring/chemical addition basins. Additionally, minor improvements to the chlorination room/process and contact basin are included in the proposed project. Foregoing these improvements will result in greater difficulties for operators and further outdating of the treatment plant. 5/1/2009

11/1/2009

$

500,000 Defield Road

This project would fund finishing the basement area at the Pere Marq District Library. PMDL has an unfinished 10,000 ft. basement area that has been designed to address the need for community space. We already have design plans for the basement project. We have a partnership with the Clare County Arts Council and our area public access television channel. The Clare County Arts Council has received funding from the Clare County Enterprise Community. The Enterprise Community realizes the community need to promote the arts and has provided funding to our local Art Council The finishing of the basement area would provide community areas for the Clare County Art Council for art displays. It will also provide an area for a small public access television studio. MAC3TV has appropriated funds to purchase equipment for the studio. Local contractors will be used for the work on this project. immediately

6-8 months after approval

$

172,455 no

T O

Paw Paw Lake Area Joint Sewage Disposal Headworks and Chlorination Process Board Coloma Charter Township Improvements Project

Expected Completion Date

970,000 Rwy 5/23 1,500,000

N s

t s e

u q e

R d

Pere Marquette District Library City of Clare

e t tt

i m

Pere Marquette District Library

b u S

Pere Marquette Township

Pere Marquette Township, Purchase and development of Industrial Mason County Property

Purchase of former Harbison-Walker property (approx. 40 acres) on S. pere marquette Hwy. (Business31), cleanup of industrial site, and development into multiuse business park. Site has railroad acccess and potential lake Michigan port access through the Dow Chemical Company property (by agreement which would have to be negotiated).

Pere Marquette Township

Pere Marquette Township, Mason County Watermain Extension

Extenstion of approx. 2600 l.f. of watermain On U.S. 10 from S. Pere Marquette Hwy. (Business 31) to Jebavy Drive to connect north and south side water service districts allowing access to municipal wall/water tower system on the south side. May, 2009

Pere Marquette Township

Pere Marquette Township, Mason County Wireless Internet Service

Instalation of wireless communication systems on existing towers and water towers to provide service to all businesses and residences in the township. June, 2009

02262009

Submitted Requests - Not Approved

$

1,746,000

Aug. 2009

$

312,000

June, 2010

$

600,000

403 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Pere Marquette Township

Project Name

Project Description

Start Date

Extenstion of approx. 1650 l.f. of watermain from First Street along S. Pere Marquette Hwy. (Business 31) to complete a loop in the water service system for service in business/industrial sector including two business/industrial parks. 4/9/2009

Pere Marquette Township, Mason County First Street Water Extension

Performance Network Theatre Ann Arbor, Michigan

Structural and Infrastructure Upgrades for Energy Efficiency

Piast Institute

Koscuiczko Garden Project

Ten year ago Performance Network Theatre ( PNT) rennovated the first level of a senior living center in the heart of downtown Ann Arbor, Michigan to serve as their new theatre. Focus was on speed since their rental facilty was being sold and torn down. Time did not allow for focus on energy efficiency only to create a working theatre space. Now a goal in PNT's five year plan is to become a totally green facility abd in turn reduce high monthly facilty costs. A grant was obtained from the Downtown Area Association of Ann Arbor to create a energy efficienty plan. Thus, this processcan can begin immediately by first replacing the antiquated windows, lighting system and HVAC systems in our lobby and office space with energy efficient systems at a cost of $70,010, payback in 7 years.. The second component is to replace our antiquated computer hardware with energy efficient and faster operational hardware at a cost $16,460. The third component, the stage lighting, would cost in excess of $140,000 with a 22 year payoff, but an immediate saving of $6,300 annually. 3/1.09 Schools and Libraries Lecture and Exhibit Project - "Koscuiczko's Garden" - Please see attached Immediate

multi purpose building

We are looking to construct a multi purpose facility to use as a gym and cafetreria and auditorium. At present we do not have a fcaility for our gym classes and a very small room that handles our lunches. 10/9/2009

Hamtramck

Pierre Toussaint Academy

Detroit

Pigeon River Intercounty Drain Board

Huron County, Sanilic County and Tuscola County, Michigan; Proposed work would be along the Pigeon River beginning at Saginaw Bay in the Village of Caseville thence easterly and southerly along the River through Caseville, Lake, Chandler, Mckinley and Win Pigeon River Intercounty Drain

T O

7/9/2009

O R

P P A

N s

Funding Request

$

D VE

180,000

6/1/2009 5/1/2010

$

34,316 N/A

8/10/2009

$

750,000

Nov. 2010

$

5,000,000

Oct. 16, 2009

$

705,000 NA

6/12/2009

$

140,000 NA

u q e

R d

Stream Mgmt. & Flood Relief for 13 Twps. & 3 Villages in 3 Counties Dredge flood relief channel Replace causeway with clear-span bridge Construct sediment basin Remove abandoned railroad bridge Stream bank stabilization Preserve the River as a "Natural Stream" Stream corridor management (selective clearing, log jam removal, sand bar removal) Oct. 2009

The project consists of extending 15,800 liner feet of water main from an existing 12" water main located at Cody Estey Road North Bay Arenac Road. 7/20/2009 The project consists of extending 2,900 liner feet of water main from an existing 12" water main across the I-75 interchange at Pinconning Road. 4/20/2009

Pittsfield Township

Pinconning Township, Bay County Infrastructure Improvements Pinconning Township, Bay County Infrastructure Improvements Pittsfield Charter Township Fire Hall Roof Replacement

Re-roof Fire Station 3.

5/1/2009

7/1/2009

$

25,000

Pittsfield Township

Pittsfield Charter Township

Digital Kiosk

Purchase and install an interactive outdoor digital kiosk to provide perpetual and up to the minute access to meeting postings, announcements and directory of services. 6/1/2009

8/1/2009

$

50,000

Environment Day

Conduct two annual Environment Days for residents to bring their trash and recyclables for free disposal. This would include large items such as refrigerators, toxics such as paint, electronic devices such as computers and items that residents want to dispose of but don't know where or how to do so.

9/1/2010

$

60,000

Pinconning Township Pinconning Township

Pittsfield Township

u S

Pittsfield Charter Township

02262009

bm

Route (Infrastructure Only)

t s e

e t t

it

Expected Completion Date

Submitted Requests - Not Approved

9/1/2009

404 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Pittsfield Township

Pittsfield Township

Pittsfield Charter Township

Pittsfield Charter Township

Pittsfield Township

Pittsfield Charter Township Pittsfield Charter Township

Pittsfield Township

Pittsfield Charter Township

Pittsfield Township

Pittsfield Township

Pittsfield Charter Township

Project Name

Pittsfield Charter Township

02262009

Start Date

GIS Implementation

Eliminate information silos and realize efficiencies by utilizing GIS technology to integrate data between the Utility, Planning, Building, Assessing Depts and the offices of Supervisor, Clerk and Treasurer. Complete GIS implementation plan by purchasing hardware, software and licenses. 3/1/2009

Ellsworth Road: Multimodal Pathway

The east side of the Township is completely dissected from the west side of the Township by US-23. As such, residents from the densely populated east side of the Township are unable to access, via non-motorized means, the majority of the Township’s green, open and park spaces. In order to address this disconnect, the sidewalk network along Ellsworth Road – a principal arterial that is a major east/west corridor – must be expanded. A complete sidewalk network on this road will provide non-motorized connection from one end of the Township to the other. Ellsworth is the northernmost corridor that connects the east side of the Township to the west. There are many existing businesses and residential developments along this corridor, as well as a concentration of development in the immediate surrounding area. There are major gaps in the existing sidewalk along Ellsworth Road from Carpenter Road, west to Lohr Road. Excluding the Ann Arbor capped landfill site at the southwest corner of Platt Road and Ellsworth Road, the entire south side of Ellsworth between these two intersections is within Pittsfield. There are approximately 2,100 total linear feet that wo5/1/2009

T O

N s

Platt Road Greenway

Residential Water Meter Replacement

Install and upgrade new and existing homes with radio meter reading technology. Replacement of these meters will enable faster and more accurate readings.

Township Recycling

d e tt

Ellsworth Road: Overpass Connections

t i m

Lohr Road & Textile Road: Multimodal Pathway

e u

st

q e R

3/1/2010

D VE $

200,000

12/1/2009

$

632,500

9/1/2009

9/1/2010

$

1,000,000

4/1/2009

12/1/2009

$

1,000,000

11/1/2008

1/1/2010

$

1,450,000

$

2,000,000

$

2,400,000

O R

In addition to sidewalks, providing a safe pedestrian crossing on highway overpasses is a critical element to completing the connection between the eastern and western portions of Pittsfield Township. Ellsworth Road between Platt Road and Carpenter Road crosses both I-94 and US-23. As described above, the Ellsworth corridor is the prime location for this connection. Based on initial observations it appears there may be capacity on both the US-23 Bridge and the I-94 Bridge to provide pedestrian facilities on the existing structure by resizing lanes and providing a safety barrier. 7/1/2009

An integral aspect of the overall non-motorized initiative of my administration is to create connections between different land uses and between different communities. Based on existing land uses within the Township and the juxtaposition of the cities of Ann Arbor and Saline, a pathway located along Lohr Road and Textile Road has been identified as another important project within Pittsfield. The concept for this project includes a ten-foot-wide multimodal pathway along roughly two (2) miles of Lohr Road south of Ellsworth Road to Textile Road and a pathway along roughly 9,000 feet of Textile Road between State Road and Maple Road. The proposed pathways would provide connections between the commercial center in the northwest corner of the Township, near Ann Arbor/Saline Road, and ultimately the City of Ann Arbor, to the jurisdictional boundary of the City of Saline south of the Saline Recreation Center at Textile Road and Woodland Drive. The portion of the proposed Textile Road pathway east of Lohr Road will allow for the connection to Marsh View Meadows, a developed Township park. Adjacent to the above mentioned commercial center and along this pr7/1/2009

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

P P A

Institute a Township-wide recycling program to reduce both residential and commerical waste streams. In addition to the traditional household recycling, this program would implement and support recycling at Apartment complexes, Condominiums and businesses that are currently without a recycling option. Complete right of way acquisitions, engineering and construction of pathways to connect Lillie and Prairie Township Parks.

b u S Pittsfield Township

Project Description

Expected Completion Date

9/30/2010

405 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Pittsfield Township Pittsfield Township Pittsfield Township Pittsfield Township

Pittsfield Township

Pittsfield Township Pittsfield Township

Pittsfield Township Pittsfield Township

Pittsfield Township

Pittsfield Charter Township Pittsfield Charter Township Pittsfield Charter Township Pittsfield Charter Township

Pittsfield Charter Township

Pittsfield Charter Township Pittsfield Charter Township Pittsfield Charter Township Pittsfield Charter Township

Project Name

New Utilities Building

9/30/2010

Sanitary Sewer Lining

Install new sanitary sewer lining in the Washtenaw Heights and Oak Park Subdivision 5/1/2009

9/1/2010

Parking Lot Replacement Fire Hall Addition

Replace existing and deteriorated parking lot (Section 4) Construct a 500 sq foot addition to provide adequate sleeping quarters for Firefighters.

Fiber Optic Connection

Install a fiber optic data connection between Pittsfield Twp and Washtenaw County Gov'ts to facilitiate a Twp-County computerized partnership. This connection is essential to maximizing the collaborative potential in the offerings and support services associated with Human Resources, Planning, technology, payroll and billing, foreclosure prevention, coordination of Human Services, purchasing and emergency management. 3/1/2009

Emergency Generator

Replace existing emergency generator with a model that can provide adequate power for heating and air conditioning to enable the Township Hall to serve as an emergency shelter and safe refuge during power outages or other emergency situations in both summer and winter. 3/1/2009

Water Booster Pump replacement

Replace Booster Pumps to achieve an optimal level of water delivery.

Admin Bldg Expansion & Interior Renovation

Construct a 2500 square foot addition to the current Administration Building to accommodate record retention, work space improvements, technology integration and HVAC upgrades. 3/1/2009 Replace and upsize 30,000’ of 6” water main in the Washtenaw Heights subdivision to increase flow and water quality. 5/1/2009

T O

School Crossing Safety Upgrades

tt i m

ub

d e t

Plymouth Canton Plymouth, Canton Wayne, Symphony Society Westland, MI CLASSical Music Outreach Program Plymouth Educational Plymouth Educational Center Preparatory Center Detroit High School

S

02262009

Start Date

Construct a new 15,000 square foot Utilities Building to meet future needs. The proposed new building would have a total of 15,000 square feet for customer greeting office, meeting, storage and staff locker needs. This building will include large indoor storage for vehicles to include a one-bay maintenance lane for minor repairs. The cost estimate is based on $200.00 per square foot, for the building and an additional $1,000,000 for utility installation and road construction. 6/1/2009

Water Main Renewal - Washtenaw Hts

Pittsfield Charter Township

Project Description

Expected Completion Date

s t s

-N

P P A 6/1/2009

3/1/2009

e u

q e R

Add safety features at the intersection of Dalton and Packard Roads; modify curbs, crosswalk markings and signal lights to improve the safety of children crossing at the ill configured intersection. 6/1/2009

The CLASSical Music Outreach program was developed with teachers to compliment standard elementary curricula, to supplement and enhance school music programs by integrating music into the Science and Language Arts curriculia. Students have the opportunity to experience live musical performances with professional musicians while learning about composers and music as well as being introduced to the four instruments families. The program consists of several visits by musicians to the schools - 2 visits (fall and Spring for 3rd grade) where students hear a string/woodwind quartet and then a brass/percussion quartet learning about the science of sound - and in 4th grade students hear a Prelude concert with all instruments families represented followed by a full orchestra performance field trip. Fall 2009 Small innovative high school to be built on planning and development land in the city o Detroit, MI. Gross square footage of 63, 211. 3/1/2009

Submitted Requests - Not Approved

D VE $

4,000,000

$

3,500,000

$

75,000

12/31/2009

$

87,500

12/1/2009

$

113,814

9/1/2009

$

200,000

10/1/2009

$

400,000

6/1/2010

$

1,050,000

9/1/2010

$

4,000,000

9/1/2009

$

125,000

Spring 2010

$

50,000

10/1/2009

$

14,000,000

O R

5/1/2009

Funding Request

7/1/2009

Route (Infrastructure Only)

406 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Storage space is at a premium in the Plymouth Historical Museum. This project will creatively reuse existing space. The locked storage addition will be built to match the esthetics of existing exhibits. Inside the addition, environmentally controlled and locked storage will provide for safekeeping of valuable historical documents and artifacts, including 2 original Abraham Lincoln signature documents valued between $10-20,000. The storage area will be secure and have limited access. The older portion of the building contains an exhibit area with a Victorian living room, dining room, kitchen, and bedroom. The area has a high ceiling and allows us to add a second story directly over the exhibit, adding 660 square feet of additional storage space. We need to add a Victorian-era facade to the front of the exhibit as the loadbearing structural support. The wooden facade will contain 5 Victorian-era windows and a door with sigelights to allow exhibit materials to be viewed. The facade will be covered with beveled siding. The remaining support for the second story will tie in to the existing block walls and the bond will be anchored into the existing masonry. There3/1/2009

Plymouth

Plymouth Township

Phase 1: Rehabilitation and stabilization of the existing township sanitary sewer to maintain the current high levels of economic development. Rehab, repairs and adjustments of existing sanitary sewer lines and manholes. Phase II: Extend water main and sanitary sewer to open up potential for the new development area in the northwestern section of the township. Add a 12 inch water main along Five Mile Road parallel to the existing line extending west of the Five Mile tank to the office structure for the State Prison. From that point, extend a new 24 inch water main to Napier Road Plymouth Charter Retention and stabilization of current township and extend the sanitary sewer along Five Mile Road and install a pump station west of Township, Wayne County infrastructure and economic areas. Ridge Road to Napier Road. 4/1/2009

Plymouth Township

Clean Water Compliance: Storm Water The area within and around the building is not paved and therefore collects the runoff from the building; various chemicals used in the operations, as well as drippings from the vehicles that are parked and travel this Elimination of negative storm water flows from area. These soils are then mixed into the general runoff for the site and ultimately into an unpaved, unsafe and deteriorating the nearby creek. The project will construct a new building and introduce best Plymouth Charter maintenance building adjacent to storm water management practices for containing the storm water flow and keep it from entering Township, Wayne County runoff stream. the creek. 4/1/2009

A T

s

t s e

Poetry Slam, Inc.

R d

2009 Women of the World Poetry Slam

e t tt

i m

Port Austin Area Sewer & Water Authority

O N

u q e

Detroit

b u S

Port Austin Township

Port Hope Community School Port Hope/Rubicon Port Hope Community School Port Hope/Rubicon

02262009

Green Energy

Insulate ceiling Window Replacement

O R

PP

Plymouth Historical Society

Locked Storage Addition

Expected Completion Date

PSI’s Women of the World (WOW) Poetry Slam is a four-day event that includes over 80 poets competing in competitive bouts held in multiple venues and culminating in a thrilling final event where the winning poet will become the Women’s World Poetry Slam Champion. 3/18/2009

Submitted Requests - Not Approved

D VE

5/1/2009

$

80,000

8-12 months after beginning consrtuction

$

4,435,000

Nov., 2009

$

500,000

3/21/2009

$

10,000

$

750,000

9/9/2009

$

130,000 yes

9/9/2009

$

56,000 yes

The Port Austin Area Sewer & Water Authority is upgrading its wastewater treatment plant per the Michigan Deparment of Environmental Quality. This upgrade is needed to bring the facility into compliance with the NPDES discharge permit. The upgrade will increase the cost of electrical power by approximately 120%. The Authority is seeking alternative sources for its energy. It is proposed that the Authority explore and implement a alternate methods of power such as wind and or solar. This program has been quite successful at the Laker School system near Pigeon. The cost of this type of alternate power would increase the cost of the facility upgrade by 31% in a community where the residents are primarily fixed income senior citizens. The facility currently uses approximately 18,000kw of electricity per month. The upgrade will increase that average to 50,000kw to 60,000kw per month. The increase in the monthly cost based upon current rates will be about $4,000 from the current mo 5/1/2009 Insulate 14,000 sq ft. of ceiling along with replacing existing roof with EDPM. Can not insulate our ceiling untill we resurface our roof, too many leaks. 7/6/2009 Window replacement replace existing windows with much more energy efficient windows. June 10,2009

Funding Request

Route (Infrastructure Only)

407 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Project Name

Submitting Agency Port Hope Community Schools Port Hope/Rubicon

Port Hope Community

Project Description WINDOW REPLACEMENT replace existing windows with much more energy efficient windows.

Port Hope Community Schools Port Hope/Rubicon

Port Hope Community

Insulate 14,000 sq ft. of ceiling along with replacing existing roof with EDPM. Can not insulate our ceiling untill we resurface our roof, too many leaks. July 5 2009

Sept 2009

Port Huron

City

Relace Makeup Air Furnances

Replace aging makeup are for the secondary treatment builing at the wastewater plant6/1/2009

9/1/2010

Port Huron

City

Replace Raw Sewage Pumps

9/1/2010

Port Huron

City

Replace Parks and Parking Lot Lighting

Replace three aging raw sewage pumps at the headworks of the plant Replace aging inefficient lighting with more efficient environmenally friendly fixtures and lamps

Port Huron Port Huron Port Huron

City City City

Replace Blowers Water Street Stone Street Phase II

Replace the blowers and diffusers in the WWTP secondary treament tanks Water main replacement, and Street reconstuction Water main replacement, sewer repair and Street reconstuction

Port Huron

City

Erie North

Combined Sewer Overflow Control Project replace sewers, and water mains

Port Huron

City

21st Street Phase I

Combined Sewer Overflow Control Project replace sewers, and water mains

T O

Start Date

Expected Completion Date

6/10/2009

6/1/2009

Sept. 2009

O R

7/1/2009

P P A 6/1/2009 6/1/2009 7/1/2009

9/1/2010

Funding Request $

56,000

D VE $

$

$

$

12/1/2010 12/1/2009 12/1/2009

$ $ $

7/1/2009

12/1/2010

$

4/1/2009

130,000 Wastewater 350,000 Treatment Plant Wastewater 825,000 Treatment Plant

1,000,000 Across the City Wastewater 1,620,000 Treatment Plant 648,000 Water Street 678,000 Stone Street

8,910,000 Various Various local 17,431,049 streets

12/1/2010

$

Port Huron Township, St. Capital Improvement Program System Clair County Upgrade - Alternative 2

Construct 4,076 lineal feet f 12 inch diameter watermain, 2,863 lineal feet of 8 inch diameter watermain, 7-12 inch gate valves and wells, 6-8 inch gate valves and wells, and 14 fire hydrants. Strawberry Lane from West Water to Huckelberry, and from Huckelberry north. 4/1/2009

Feb. 1, 2010

$

750,000

Port Huron Township

Port Huron Township, St. Capital Improvement Program System Clair County Upgrade - Alternative 1

Construct 10,591 linel feet of 12 inch diameter watermain, 15-12 inch gate valves and wells, and 21 fire hydrants. Michigan from West Water to Lapeer, and then from Lapeer to Griswold. 4/1/2009

Aug. 1, 2010

$

1,250,000

Port Huron Township

Sanitary Sewer System Upgrade Port Huron Township, St. Recommendation - Griswold Pump Station Clair County Pump Upgrade.

Install two chopper pumps with guide rails, pump discharge base elbows and wet well piping. Griswold at 25th Street. 4/1/2009

Sept. 1, 2009

$

75,000

Port Huron Township

Sanitary Sewer System Upgrade Port Huron Township, St. Recommendation - West Water Street Pump Replace exisitng 12 inch forcemain with 16 inch forcemain under I-94 to a discharge Clair County Station - Force Main Replacement manhole. West Water Street at I-94. 4/1/2009

Dec. 1, 2009

$

450,000

Port Huron Township

Port Huron Township, St. Capital Improvement Program Sstem Clair County Upgrade - Alternative 4

Construct 4,991 lineal feet of 12 inch diameter watermain, 8-12 inch gate valves and wells, and 10 fire hydrants. Henry from Water Street to 32nd Street. 4/1/2009

Dec. 1, 2009

$

540,000

Port Huron Township

Port Huron Township, St. Capital Improvement Program System Clair County Upgrade - Alternative 3

Construct 6,623 lineal feet of 8 inch diameter watermain, 8-1- inch gate valves and wells, and 13 fire hydrants. Country Club, Woodland and Waldheim.

Oct. 1, 2009

$

850,000

Port Huron Township

Upgrade alarm systems at eight of thirteen pump stations in the sanitary sewer system. Beech Road at Black River, Lewis Drive at Stock's Creek, Maywood south of Sanitary Sewer System Upgrade West Water, Stock's creek Manufactured Home Community north of Lapeer and west Port Huron Township, St. Recommendation - system telemetry for eight of I-94, Yorkshire at Berkshire, Ravenswood at Michigan, 32nd Street at Clair County pump stations Ravenswood, Strawbery Lane at Bakers Field. 4/1/2009

Sept. 1, 2009

$

50,000

Port Huron Township

Sanitary Sewer System Upgrade Port Huron Township, St. Recommendation - Maywood Pump Station Clair County rehabiliatation

4/1/2009

7/1/2009

$

125,000

4/1/2009

Sept. 1, 2009

$

160,000

7/1/2009

7/1/2011

$

4,300,000

Port Huron Township

Port Huron Township Portage Township

S

m b u

e u

eq

R d

e t t

it

s t s

-N

Upgrade pump station from pneumatic ejector to conventional submersible pump configuration. Maywood south of West Water.

Construct upgrades to the Strawberry Lane pump station to include duplex and one Port Huron Township, St. Sanitary Sewer System Upgrade spare 750 GPM pumps, control panel with VFDs, and wetwell top replacement with Clair County Recommendation - Strawberry Lane Upgrade. safety hatch. Development of a sanitary sewer system within the business district of Portage Portage Twp. Portage Twp. Sanitary Sewer System Township, in Curtis.

02262009

Submitted Requests - Not Approved

4/1/2009

Route (Infrastructure Only)

408 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Presque Isle Academy Onaway Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC Presque Isle Co RC

Public Museum of West Michigan

Project Name

Presque Isle Academy

Project Description

Start Date

Expected Completion Date

The Presque Isle Academy is prepared to begin new construction or remodel an existing building. The Academy has several options available at this time and can be "shovel ready". One option is to remodel an existing elementary school into an alternative high school. All options range between $450,000.00 and $650,000.00. The Presque Isle Academy is currently in the pre-application process of securing a USDA grant. Fund equity is approx. $300,000.00 and the Academy is financially stable. Whiskey Point Road East Grand Lake Road west Beach Grove Highway Felax Road west West 634 Highway Co. Rd. 451 west Swan River Road US-23 south Walker Highway Ocqueoc Road east Darga Highway Leer Road east Hagensville Road W. Metz Highway north Ocqueoc Falls Highway M-68 west N. Grand Lake Highway* US-23 southwest Polaski Road E. 634 Highway north Hackett Lake Hwy M-33 east N. Grand Lake Highway* M-65 east Petersville Road US-23 south Long Lake Highway* M-65 east East Heythaler Hwy* US-23 west East 638 Highway US-23 east Shubert Highway/Road US-23 west, south Leer Road East Metz Highway south Glaiser Road M-68 south East 638 Highway M-65 west Co. Rd. 451* Hawks south South Porter Road* M-68 south Ocqueoc Road* US-23 south West 638 Highway M-33 east Three Mile Highway* M-33 east Co. Road 451* US-23 south

T O

O R

P P A

N s

t s e

u q e

R d

The Roger B. Chaffee Planetarium has a long history of promoting science awareness and education in West Michigan. Its mission to help visitors understand the universe and their place in it is increasingly being hampered by equipment obsolescence. The Planetarium must upgrade its technology, or face unsustainability by 2011. This upgrade project will introduce state-of-the-art full dome video technology to the sky theater, creating a much more immersive planetarium experience than ever before, allowing educational concepts to be taught in new ways. The project will also implement improvements to the show production and educational program development processes that will allow the Planetarium to utilitize this newly upgraded 10/1/2009 Planetarium Immersive Technology Upgrade technology to its full potential.

D VE $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

450,000 46,500 69,750 93,000 116,250 139,500 186,000 200,000 209,250 232,000 250,000 269,700 279,000 325,500 372,000 375,000 465,000 488,250 558,000 562,500 651,000 697,500 750,000 976,500 1,000,000 1,600,000 2,500,000

$

2,000,000

e t tt

i m

ub

Grand Rapids

Funding Request

Route (Infrastructure Only)

10/10/2010

S 02262009

Submitted Requests - Not Approved

409 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Public Museum of West Michigan

Project Name

Project Description

Start Date

Expected Completion Date

Grand Rapids

This is a two part project. The first part of project will bring together a team of engineers, technicians, museum professionals, and renewable energy professionals to re-engineer and re-design the Heating, Ventilation and Air Conditioning (HVAC) system and the Direct Digital Control (DDC) system at the Van Andel Museum Center in order to improve energy efficiency, energy conservation, maintain a museum quality environmental standards, and to incorporate alternative, renewable energy systems to achieve partial energy independence and sustainability. Working in tandem with this group, a second team made up of museum staff, designers, engineers, volunteers and educators will develop an accompanying exhibit, of up to 3500 sq. ft., dealing with the topic of alternative, renewable energy developments, sustainable living practices, environmental choices, emerging "green" technology. This exhibit and its supporting programs will provide an educational resource for local schools, help them meet state guidelines in Science Education and present to the public at large an informative, 5/1/2009 Energy Conservation and Sustainabilty Project evolving exhibit that deals with Michigan's place in the "green" economy.

Grand Rapids

The Public Museum collects and preserves community treasures and strives to make them accessible and available to the public. A key strategic vision for the Museum is to dramatically increase public access to the Museum's collections to encourage high quality and innovative learning experiences for all facets of our community including developing new partnerships that bring local college/university faculty and students in direct contact with the museum's stored collections on a regular basis. The currently vacant museum facility on Jefferson Avenue in Grand Rapids that was originally constructed with Works Progress Administration (WPA) dollars in 1938-40 needs significant interior renovations in order to be repurposed. The Art Deco building is an architectural gem that anchors the Heritage Hill Historic District neighborhood and the expanding St. Mary's Hospital and surrounding medical community. This building's renovation is the last phase needed to complete the larger centralized community archives in downtown Grand Rapids, known as the Community Archives and Research Center, that's been developed collaboratively with the Grand Rapids and Ke5/1/2009

P P A

O R

Funding Request

D VE

Phase #1 April 2010: Phase #2 April 2011

$

4,500,000

9/1/2010

$

3,071,000

7/20/2009

$

300,000

Northwest Michigan Biodiesel is a small business that has been operating in Grand Traverse Country, MI since the Fall of 2006. It has been developing, using only the modest discretionary income of the founder, a unique process for manufacturing ASTM 5761 quality biodiesel from field-grow canola oil seeds. The process is unique because it encompasses all aspects of manufacturing biodiesel, from planting the Canola feedstock to using the biodiesel, such that profit is produced from at least three steps in the process. This makes the business profitable, therefore sustainable, at B-100 production scales of 500K gallon per year for a total investment of approximately $500K. This relatively low investment level lends itself to setting up many biodiesel production sites to service customers in relatively small regions around the production site, minimizing fuel-hauling charges as well as providing business and employment opportunities for many. To date, only the individual steps Immediately upon One complete Demonstration of unique biodiesel production of this unique process have been demonstrated and only at a small scale and not cycle, but at the approval of integrated. This project would set up a full scale demonstration which is necessary to aproject process latest August 2010 $

825,000

T O

Route (Infrastructure Only)

N s

Public Museum of West Michigan

Public Museum of West Michigan

Grand Rapids

Historic Renovation and Adaptive Re-use of Museum's WPA Facility

02262009

it

m b u

S

Pure Eco Environmental Solutions on behalf of Northwest Michigan Biodiesel Traverse City, MI

d e tt

Catering Kitchen Construction Project

t s e

qu

e R

Catering Kitchen - The Public Museum is in need of a renovated and enlarged catering kitchen. This would expand the Museum's capacity to provide food service for a growing facility rental program. Current kitchen facilities only allow small to medium scale catering. The catering kitchen would enable the Museum to handle larger catering opportuinites and also integrate food into other Museum programs for an enhanced visitor experience. The proceeds from the catering program support the Museum's educational programming. 6/1/2009

Submitted Requests - Not Approved

410 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Pure Eco Environmental Solutions on behalf of OU Inc. Putnam Township Putnam Twp. Putnam Township Putnam Twp.

Raven Hill Discovery Center Raven Hill Discovery Center

Wilson Township

Wilson Township

Project Name

Project Description

Start Date

Expected Completion Date

Energy Efficiency Improvements to, and Renewable Energy Generators for, OU Inc Smart Zone Facility Recycling Program Lakelands Trail Development

OU Inc is considering a move to a larger facility at 1350 Hamlin Rd in Rochester Hills, MI. The facility was built in 1984 and lacks the operating efficiency of modern buildings. Pure Eco Environmental Solutions is considering becoming a client of OU Inc. It would like to use this building and this project to improve the energy efficiency of the building first, then add renewable energy generators like a photovoltaic array and a wind turbine, to further reduce the operating cost of the building for both its owners and tenants. This project would result in a model for what can be done for the many other similar buildings in SE MI. This project and the building would also attract clients to this OU Inc site interested in the conservation and renewable energy businesses. Recycling bin program 4/1/2009 Paving & Development

O R

Funding Request

D VE

2009 2009

$ $

Back to School

The focus of Raven Hill Discovery Center's Back to School project is on remodeling the Center’s one room schoolhouse. Building two enclosed porches and improving the main building will result in three locations for groups to enjoy classes, projects, and 'play' school. Financial help is needed to replace the roof, straighten walls, repai siding and replace trim, relocate the bell, install energy efficient windows, build a handicapped entry, and provide storage areas. The main part of the school building will have heat added for year round use and the two porches will be screened for three season use. Updated electrical wiring and a support beam will make the 'old' structure safe and sound. 5/1/2009

9/1/2009

$

97,750

Sky Pod Observatory

Installation of a Sky Pod Observatory will allow for permanent storage and greater usage of the 16" reflecting telescope and other smaller telescopes that have been donated to Raven Hill Discovery Center.

5/1/2009

$

4,000

The final phase for Raven Hill Discovery Center’s Energy House is to finish the interio of the building with ceiling and floor insulation; small amounts of drywall, electrical wiring, flooring and painting; complete the bathroom and closet; add ramps and railings, as well as add additional batteries and solar panels, a sun tracker and a smal wind turbine to complete the alternative energy exhibit/house. The total cost to finish & equip the Energy House exhibit is $67,430. The goal of the Energy House is to showcase how wind and solar energy can be used as alternatives to fossils fuels and how Northern Lower Michigan residents and visitors might incorporate some of the energy conservation, wind and solar energy ideas in the Energy House into their own homes and businesses. The Energy House Exhibit will look like an average American Home, but demonstrate energy conservation and alternative energy ideas. It will also be a building that will provide much needed space for activities, workshops, meetings and conferences. 6/1/2009

10/1/2009

$

67,430

North Hayes Sewer Interceptor

Construction of 3 miles of 48" and 1 mile of 42" sanitary sewer to provide a gravity outlet to Washington and Ray Townships. This project will serve an area of Ray Township with failed septic systems and eliminate a deficient pump station and force main currently owned by Washington Township 180 Days

18 Months

$

E-Waste

re.Source Partners is currently involved with efforts to avoid E-Waste from entering our landfills. The Company works with both the business and consumer sectors to make available the downstream recycling process for electronics. re.Source Partners is an ISO 14001 registered organization that employs sound business practices to ensure full transparency of all material downstream flows. These polices ensure a “no landfill” solution to this growing concern. 6/1/2009

90 Days

$

7,500,000

Recycle Center

Build recycle center to provide residents a place to recycle their plastic, glass, cardboard, tires, and other recyclable items, to reduce the amount of material going to landfills. 4/1/2009

7/15/2009

$

125,000

T O

s t s

-N

P P A 4/1/2009

Route (Infrastructure Only)

20,800 100'x200' lot 1,262,400 6.1 miles

e u

Raven Hill Discovery Center

Ray Township

Wilson Township

it

Energy House

m b u

Ray Township

S re.Source Partners

Reading Township

Clinton Township, Michigan Reading Township, Hillsdale County

02262009

d e tt

q e R

Submitted Requests - Not Approved

13,351,518 See Attachment

411 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Reading Township, Reading Township Hillsdale County

Wild Fire Truck

Red Barn School for the Performing Arts

The Red Barn Theater in Saugatuck is one of the few remaining Barn Theaters in the United States. It began as a cow barn on the Belvedere estate in 1914. The Saugatuck Community Players made it into a Summer Stock Theater in 1952 and continued to add on to the structure until the house held over 240 seats. The Lakeshore Arts Alliance feels compelled to preserve this historic building as a theater and as a year around venue for the performing arts so that future generations can see and experience the history of Barn Theaters in the Midwest. Instead of tearing down the structure, the LAA has done the ultimate in recycling by putting thousands of hours and close to One Hundred Thousand Dollars into the preservation and partial insulation of The Red Barn. More needs to be done to make the space amenable to patrons and tourists. Since Tourism is so important to our local and state economy, we see the need for suitable The Red Barn School for the Performing Arts air conditioning for the summer and heat in the winter. We have need of toilet facilities, safety features, insulation, low VOC paint and other amenities which will cha4/1/2009 Project

Laketown Township

Project Name

Project Description

Start Date

Purchase wild fire truck to fight wild fires in the district.

3/1/2009

T O

Improvements to foster economic growth and revitalization of a blighted commercial corridor using various enhancements including, on and off street parking (using porous pavement and stormwater BMP's), street trees, landscaping, and lighting. 7/1/2009 Replacement of Traffic signals with new mast arms and L.E.D. signals at three major intersections within the DDA. 7/1/2009 Community wide on and off road bicycle facilities 7/1/2009 Pedestrian Bridge that provides a critical link in a community wide non-motorized transit system. 7/1/2009 Street closure and retrofit with porous pavement, native landscaping and L.E.D. lighting. 7/1/2009 Placement of walking trail in Phoenix Park. Walking trail will be constructed with pourous pavement and will be ADA compliant. 7/1/2009 Purchase of 10 vehicles (hybrid), including plug-in and alternative fuel type vehicles to improve energy and fuel efficiency. 7/1/2009 Elimination of the remaining 8 uncontrolled Combined Sewer Overflows to the Bell Branch and Ashcroft Drain 7/1/2010

Redford Township

Seven Mile Road District Improvements

Redford Township Redford Township

Redford Township Redford Township

L.E.D. Traffic Signals Non-Motorized Trails

Redford Township

Redford Township

Bell Creek Park Bridge

Redford Township

Redford Township

Elsinore Street Parking

Redford Township

Redford Township

Phoenix Park Lot

Redford Township

Redford Township

Motor Vehicle Fleet

Redford Township

Redford Township

CSO Control Program

Redford Township

Redford Township

Five Mile and Beech Daly Roads Streetscape Streetscape Enhancement including; pedestrian amenities, L.E.D. street lamps, onImprovements street parking, street trees, landscaping, bike lanes and bump-outs

Redford Township

The Redford Town Hall complex has numerous HVAC systems that service 3 separate buildings and the existing system is extremely inefficient. The Township would like to install a new "Green" energy efficient system that will meet all Energy Star and LEED Standards. The new system will allow us to have a significant reduction in energy costs yearly.

Redford Township

Redford Township

Redford Township

Redford Township

Redford Township

02262009

$

D VE

This help will enable us to begin the project this Spring. Construction will be finished by September, 09 $

270,250

6,000,000

10/31/2009 10/31/2009

$ $

1,200,000 4,500,000

10/31/2009

$

500,000

10/31/2009

$

500,000

10/31/2009

$

200,000

10/31/2009

$

250,000

12/31/2014

$

90,000,000

7/1/2009

10/31/2009

$

3,000,000

7/1/2009

10/31/2009

$

1,000,000

Kraft Park Lot

Installation of pourous pavement that will allow for proper water discharge and reduction of storm water runoff and pollutants. The Township fully supports the efforts of environmentally friendly practices to improve water quality for our residents. 7/1/2009

10/31/2009

$

100,000

Jaycee Park Lot

Installation of pourous pavement that will allow for proper water discharge and reduction of storm water runoff and pollutants. The Township fully supports the efforts of environmentally friendly practices to improve water quality for our residents. 7/1/2009

10/31/2009

$

150,000

Township Hall Parking Lot

Installation of pourous pavement that will allow for proper water discharge and reduction of storm water runoff and pollutants. The Township fully supports the efforts of environmentally friendly practices to improve water quality for our residents. 7/1/2009

10/31/2009

$

500,000

tt i m

s t s

-N

e u

d e t

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

45,000

$

ub

S

O R

Funding Request

10/31/2009

Township Hall Building Improvements

Redford Township

7/1/2009

P P A

Redford Township

Redford Township

Expected Completion Date

412 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Redford Township

Project Name

Project Description

Start Date

Expected Completion Date

Replacement of trees along the Township's major thoroughfares where the exisitng trees have been diseased and destroyed by the Emerald Ash Borer infestation.

Redford Township

Street Tree Replacement Program

7/1/2009

10/31/2009

Redford Township

Redford Township

10/31/2009

Redford Township

Redford Township

Replace existing watermain in central Redford. The application for this project has been submitted to MDEQ and is currently on the Drinking Water Revoloving Fund Replace existing Watermain (Central Redford) (DWRF) Priority List. 4/1/2009 Law Enforcement Communications (911 This telecommunications improvement will allow for the purchase of a new 911 public System) safety answering point equipment (PSAP). 5/1/2009

Redford Township HOWELL TWP.

To replace all Redford Township two-way radios and to allow the police, fire and publi service departments to have statewide interoperability capabilities. This communication improvement will allow Redford Township to join the Michigan Public Law Enforcement Communications (MPSCS) Safety Communications System (MPSCS). 7/1/2009 M-59/I-96 Interchange Improvements RAMP REALIGNMENT 3/1/2009

Redford Township Rep. Cindy Denby

Rochester Hills, MI

Richfield Township

Ribbon Technology International (Horizontal Ribbon Growth)

d e tt

t i m

Richfield Township Development

$

250,000

D VE $

5,000,000

$

200,000

10/31/2009 12/15/2009

$ $

600,000 5,150,110

Ribbon Technology International (RTI) is respectfully requesting $5,000,000 in funding to assist in the development, manufacturing and sale of its revolutionary processing technology to create single crystal silicon wafers. RTI produces single crystal silicon wafers using its patented breakthrough material processing technology at a cost 50% lower than current state of the art methods. The silicon wafer material is produced with consistent material properties and high quality characteristics. We produce single crystal silicon in a continuous ribbon rather than a cylinder of limited length. Our price advantage in the production of high quality single crystal wafers resulting from this process allows us to sell single crystal wafers at a significantly lower cost than today’s market. That lower cost can translate to a substantial reduction in the price of solar electricity; and lower cost for quality silicon wafers for the electronics industry. Our process will dramatically extend the usage of the available polysilicon feedstock due to far less waste of material during production, and a thinner final wafer. This will release March, 2009

September, 2010

$

5,000,000

The Richfield Township Project is for new building construction (11,160 sq. ft.) to replace the current (6,500 sq. ft.) aging essential government facility that is beyond repair. Richfield Township, 1 of 11 rural Townships within Roscommon County, has a median Household Income of $26,806 compared to the State of Michigan $45,763. High poverty level in Richfield Township allows a priority status for grants submitted to USDA. The new facility is energy efficient using material such as R-50 insulation and other materials and technology that reduce carbon footprint. Major focus of this project is building a multi-purpose municipal facility with capacities beyond the basic public needs. The new facility will house the current Richfield Township Department o Public Safety consisting of police, fire, EMS, and CERT (Citizens Emergency Response Teams).The current aging structure is the only governmental building that presently serves as an emergency shelter serving all of Roscommon County certified by the Red Cross. Additionally, of 13 northern counties, Richfield Township is one of only two shelters that has a generator with the capability for full function use of the fac 5/9/2009

12/9/2009

$

1,328,173

T O

Ribbon Technology International

Funding Request

e u

q e R

O R

P P A

N s

st

10/31/2009

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

413 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Richland Township

Project Name

Project Description

Start Date

Richland Township Park

Richland Township Community Park serves as the hub for many recreational/community activities servicing the Richland Township Community and Hemlock Public Schools, along with the neighboring communities who do not have a parks. The park is 33 acres in size with five ball diamonds, basketball court, playground equipment, four picnic shelters (tables/grills), horseshoe pits, nature trails, exercise pathway with stations, shuffleboard court, soccer fields, Skate Park, restrooms. All facilities are handicap accessible. The Park operates a very successful softball/baseball program, along with a joint summer recreation program with the Hemlock School District with overall attendance at approximately 1662; annual Hemlock Sawdust Day event which draws approximately 2000 people; concerts in the Park which drew approximately 800; picnic pavilions are rented nearly every weekend for various group gatherings. The Township Park works very closely with the Hemlock Public Schools and two local parochial schools regarding shared use of the facilities and programs for recreation activities. The Park operates on one mill until 20 Spring 2009

Richland Township

Richland Township Road Improvements

Based on the recent traffic study performed by Wade Trim, Inc. in October of 2008 which addresses traffic and transportation impacts of the proposed Hemlock Semiconductor Corporation (HSC) development, the site will be accessed from Orr and Geddes Roads, both located in Richland Township. According to the directional traffic study trip distribution, approximately 77% of trips for Hemlock Semiconductor Corporation employees, based on the employee zip codes, travel through Richland Township (south 4%/west 18%/north 35%). In order to handle the large traffic volumes, the rural roads, as submitted, definitely need to be addressed. The roads listed have all deteriorated and with the increased traffic volume, safety has become an important issue. Funding for the roads submitted would alleviate congestion in the developing areas all related to Michigan’s economic development, the “Anchor District” . Orr Road, Frost to Tittabawassee (2 Miles), Geddes Road, Orr to Hemlock Rds. (3 Miles), Tittabawassee Road, Steel to Brennan Rds. (2 Miles), Watson Road, Gratiot (M-46) to Doyle Rds. (1 Mile) 5/1/2009

Richmond Richmond

Lee Elementary Carpet Replacement Lee Elementary Classroom Ventilation Replacement

Richmond

Lee Elementary Wireless Network

Richmond Richmond

Richland Township

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

Summer 2009

$

175,000

N s

Richland Township Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Riga Township Riga Township Riga Township Riga Township

S

Richmond Riga Township, Lenawee County Riga Township, Lenawee County Riga Township, Lenawee County Riga Township, Lenawee County

02262009

e R

10/1/2009

10/1/2009

12/31/2009

$

180,000

Lee Elementary Classroom Ventilation Replacement

10/1/2009

12/31/2009

$

450,000

Lee Elementary Wireless Network

7/1/2009

9/30/2009

$

50,000

Lee Elementary Door Window Replacement

Lee Elementary Door Window Replacement

7/1/2009

9/30/2009

$

200,000

Lee Elementary Masonry Restoration

Lee Elementary Masonry Restoration

7/1/2009

9/30/2009

$

450,000

Lee Elementary Security Entrance

Lee Elementary Security Entrance

6/15/2009

8/15/2009

$

40,000

Lee Elementary Computer Replacement

Lee Elementary Computer Replacement

7/1/2009

9/1/2009

$

130,000

Lee Elementary Roof Replacement

Lee Elementary Roof Replacement

6/15/2009

8/15/2009

$

275,000

Energy Efficiency for Township Hall

Replacement of 9 windows

5/1/2009

6/30/2009

$

2,089 NA

Energy Efficiency for Township Hall

Replace 4 thermostats with touchscreen programmable thermostats

March, 2009

March, 2009

$

800 NA

Energy Efficiency for Township Hall

Additional insulation installation

4/1/2009

5/31/2009

$

2,339 NA

Energy Efficiency for Township Hall

Replacement of ceiling tile with fiberglass insulated tile

4/1/2009

5/31/2009

$

3,270 NA

d e t

m b u

Richmond

qu

Lee Elementary Carpet Replacement

itt

Richmond

t s e

Submitted Requests - Not Approved

414 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Project Name Riga Township, Lenawee Riga Township County Energy Efficiency for Township Hall

Window replacement with Low E Argon

Riverside Arts Center

Riverside Arts Center "green" proposal

Energy conservation and solar energy installation. Modify existing community arts center's HVAC, plumbing fixtures & windows to reduce energy demands. Install 5KW photovoltaic system to augment electrical useage. Reduced energy expenditures will allow more income to be devoted to programming. The arts center's primary goal is to stimulate economic activity within a struggling downtown business district. This proposal furthers that goal. 4/1/2009

City of Ypsilanti

Project Description

Start Date 5/1/2009

Rochester College Rockford

Rochester Hills Rockford

Rochester College Health and Life Science Building Spring St. Utilities

The Project is the completion of the Rochester College Health and Life Science Center. The Center will house the Crittenton Hospital School of Nursing and the Behavorial Science Institute. The proposed shovel ready project is a partnership between Rochester College and Crittenton Hospital and will provide nursing curricula for nurses and behaviorial science graduates of the 21st century. Crittenton Hospita Foundation has committed 3.25 Million over 5 years for programming as well as 1.5 million raised to date by Rochester College. Delivery Platforms in the form of distance learning utilyzing state of art interactive methods of educational delivery is a plus to their approach. 5/9/2009 Replace 4" Watermain under street 7/1/2009

Rockford

Rockford

Street Utilities

Water & Sewer Main Upgrades Under Four Local Streets in the City of Rockford

Rockford Rockford Rogers City Rogers City Rogers City Rogers City Rogers City Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County

Rockford Rockford Rogers City Rogers City Rogers City Rogers City Rogers City Denton Twp. Denton Twp. Denton Twp. Denton Twp. Denton Twp. Denton Twp. Denton Twp.

Main Street Well Expansion

Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County Roscommon County

Denton Twp. Village of Roscommon Village of Roscommon Richfield Twp. Richfield Twp. Village of Roscommon Village of Roscommon Village of Roscommon Village of Roscommon Lake Twp Richfield Twp. Markey Twp. Markey Twp.

Roseville

02262009

T O

Funding Request

6/30/2009

9/30/2009

P P A

O R

Route (Infrastructure Only) NA

D VE $

150,000

11/9/2009 9/1/2009

$ $

4,750,000 220,000 Bridge to Summitt

7/1/2009

9/30/2009

$

1,400,156

6/1/2009 6/1/2009

7/1/2009 7/31/2009

Law Enforcement Garage Rental to State offices - Well Rental to State offices -Doors Rental to State Offices - Lighting Houghton Lake Comm Center/Roof Houghton Lake Comm Center/Parking lot Houghton Lake Comm Center/Ceiling

Mill & Overlay Main Street from Division to Courtland Expand Current Well Field to Increase Capacity Per MDEQ Requirements Water Main - Part 1 Grambau Center Water Main - Part 2 Street Lighting Wastewater Treatment 1) Storage garage 40'x100' 2) New Well - Arsenic free drinking water 3) Door replacement/Hardware 4) Rental - Outside Lighting 5) HL Center Lower Roof Replacement 6) HL Center resurface parking lot 7) HL Center - New ceiling/lights/fans

5/1/2009 4/1/2009 4/1/2009 5/1/2009 5/1/2009 5/1/2009

5/10/2009 4/15/2009 4/15/2009 5/30/2009 5/30/2009 5/30/2009

$ $ $ $ $ $ $ $ $ $ $ $ $ $

Division to 210,000 Courtland 343,000 120,000 1,500,000 2,000,000 2,500,000 5,000,000 286,200 10,000 12,400 6,000 25,000 30,000 20,000

Houghton Lake Comm Center/outside doors Roscommon Center-Parking lot Roscommon Center-Outside lighting St. Helen Center - Parking Lot St. Helen Center - Roof Replacement County Bldg-Ceiling/lights County Bldg - Roof Replacement County Bldg - Boiler duct work Sheriff Carport front closure Houghton Lake Dam - Flood Gates St. Helen - 2 Flood Gates County Airport - Hanger Addition Airport - New boiler/air conditioner

8) HL Center - New outside Doors 9) Roscommon Center - Parking lot 10) Roscommon Center - Outside lighting 11) St. Helen Center - Resurface parking lot 12) St. Helen Center - Roof Replacement 13) County Building -new ceiling & lighting 14) County Building - Roof Replacement 15) County Building - Boiler duct work 16) Sheriff Carport - Add front closure 17) H.L. Dam - 5 Flood Gates 18) St. Helen Dam - 2Flood Gates 19) Airport Hangers 20) Airport - New Boiler system in terminal

5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009

5/30/2009 5/30/2009 5/30/2009 5/30/2009 5/30/2009 5/30/2009 6/30/2009 6/30/2009 6/30/2009 10/30/2009 6/30/2009 8/30/2009 12/31/2009

$ $ $ $ $ $ $ $ $ $ $ $ $

Sewer Lining and Replacement

Line or replace structurally deficient sewers throughout the City in order to alleviate sewer failures which may cause sewer backups, sanitary sewer overflows and costly, disruptive restoration. 6/1/2009

12/1/2010

$

s t s

-N

e u

eq

R d

e t tt

i m

b u S

Roseville

Expected Completion Date

Submitted Requests - Not Approved

4,000 30,000 3,200 40,000 10,000 30,000 200,000 50,000 30,000 250,000 50,000 450,000 25,000

15,000,000 City Wide

415 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Roseville

Roseville

Project Name Project Description Start Date Parks and Recreation Building Rehabilitation Rehabilitate the existing building with many needed structural renovations in order to (CDBG) maintain the building's serviceability 7/1/2009

Roseville

Roseville

Martin Road Water Main Replacement

Roseville

Roseville

Kathy Road Reconstruction (CDBG)

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year. Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area.

Roseville

Roseville

Groveland Road Reconstruction (CDBG)

Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area.

Roseville

Roseville

Roseville

Roseville

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main Utica Water Main Replacement which breaks within the roadway several times a year. 6/1/2009 Parks and Recreation Building Rehabilitation Rehabilitate the existing building with many needed structural renovations in order to (CDBG) maintain the building's serviceability 7/1/2009

Roseville

Roseville

Roseville

Roseville

Expected Completion Date

4/15/2009

8/1/2009

5/1/2009

10/1/2009

Utica Water Main Replacement

Martin Road Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

s

t s e

O N

O R

6/1/2009

A T

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

5/1/2010

PP

6/1/2009

4/15/2009

11/1/2009

Funding Request $

800,000

D VE

11/1/2009

$

$

Route (Infrastructure Only)

Martin RoadBrinker to East City 550,000 Limit Kathy St- Frazho to 640,000 11 Mile

$

Groveland- Martin 1,000,000 to 12 Mile Road

$

Utica Road- Castle 1,500,000 to Gratiot

5/1/2010

11/1/2009

Utica Road- Castle to Gratiot

8/1/2009

Martin RoadBrinker to East City Limit

Roseville

Roseville

Sewer Lining and Replacement

Roseville

Roseville

Kathy Road Reconstruction (CDBG)

Line or replace structurally deficient sewers throughout the City in order to alleviate sewer failures which may cause sewer backups, sanitary sewer overflows and costly, disruptive restoration. 6/1/2009 Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area. 5/1/2009

Roseville

Roseville

Groveland Road Reconstruction (CDBG)

Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area.

Water System Reservoir

Construct a bi-City(Roseville and Eastpointe) water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows. 7/1/2009

7/1/2010

Construct a bi-City(Roseville and Eastpointe) water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows. 7/1/2009

7/1/2010

Water system improvements. M-139 to Old Wyndwicke Road.

7/1/2009

Nov. 30, 2009

$

350,000 NA

Maiden Lane Watermain

Water system improvements. Hollywood Road to Niles Road.

6/1/2009

Aug. 31, 2009

$

212,000 NA

Scottdale Road Watermain

Water system improvements. Marquette Woods Road to M-139

4/15/2009

Aug. 31, 2009

$

337,000 NA

Hollywood Road Watermain

Water system improvements. John Beers to Tilly Road.

4/15/2009

Sept. 30, 2009

$

855,000 NA

John Beers Road Watermain

Water system improvements. John Beers Road to M-139 to Marquette

4/15/2009

Oct. 31, 2009

$

935,000 NA

Roseville

Roseville/Eastpointe

Roseville Royalton Township Royalton Township Royalton Township Royalton Township Royalton Township

Roseville/Eastpointe Royalton Township, Berrien County Royalton Township, Berrien County Royalton Township, Berrien County Royalton Township, Berrien County Royalton Township, Berrien County

02262009

i m

M-139 Watermain

S

ub

R d

e t tt

Water System Reservoir

u q e

Submitted Requests - Not Approved

6/1/2009

12/1/2010 10/1/2009

City Wide Kathy St- Frazho to 11 Mile

11/1/2009

Groveland- Martin to 12 Mile Road

$

2,500,000 10 Mile and Gratiot

10 Mile and Gratiot

416 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Russel Center for the Creative Arts (501C3) Detroit

Project Name

Project Description

Russell Arts & Technology Center

Saginaw County

James Township and Saginaw Township

Saginaw County

Saginaw County Airport

Phase IV Saginaw Valley Rail Trail Harry Browne Airport Jet Fuel System Upgrade

Saginaw County

Saginaw County Airport

Harry Browne Airport Terminal New

Saginaw County

Saginaw County Airport

Harry Browne Airport Taxiway Rehab

Saginaw County

Saginaw County Airport

Harry Browne Airport Runway Refurbished

Start Date

Expected Completion Date

The Russell Center for the Creative Arts (RCCA), a 501c3 organization, began 3 years ago in a 2.2 Million SF former industrial facility near Detroit’s Poletown plant. RCCA has already developed 400,000SF as arts studios, now filled with 150 working artists; some beginners, some accomplished artists shipping their art worldwide. RCCA also developed 70,000SF in the same complex as the Russell Bazaar, which draws thousands of people every weekend, selling arts and crafts in 100 individual booths; with stages for music and other performances. 4/1/2009 Construction of approximately 1.4 miles of bituminous non-motorized pathway connecting the northernmost trailhead of the Saginaw Valley Rail Trail on Stroebel Road to the non-motorized Center Road Bridge that is slated for construction in 2010. This is a critical connection that will effectively link the trail into Saginaw Township and ultimately Bay and Midland Counties. 6/1/2010 Jet Fuel System - upgrade to antiquated system, need $5,000 - our 2.5% match of Federal Grant New Terminal - Replaces 83 year old terminal - Need $12,500 - our 2.5% match of Federal Grant Rehab to existing & Cracked taxiways A,C,D,E - Need $37,500 - our 2.5% match of Federal Grant Refurbish Main Runway that is in bad shape - Need $75,000 - our 2.5% match of Federal Grant

A T

s

t s e

10/1/2010

PP

O R 12/1/2010

O N

Funding Request

D VE $

Route (Infrastructure Only)

4,500,000

$

Stroebel Road Parking Lot to Center Road 565,000 Bridge

$

200,000

$

500,000

$

1,500,000

$

3,000,000

The Cheboyganing Creek Intercounty Drain is an established drain. The drainage district encompasses 76,357 acres and is 16 miles long thru Saginaw, Tuscola and Bay Counties. It discharges into the Saginaw River at the North Saginaw and South Bay County line. The drain was established in 1884 and has had limited maintenance done throughout the years. The last major project on the drain was in 1968. A full engineered project was proposed in 2000 that showed several feet of sediment in the lower end of the drain and much debris throughout the drain was creating flooding and the loss of capacity. The lack of funding and the Saginaw River not being kept dredged stopped the project. The drain is a major outlet for very valuable farmland, public roads and municipal facilities in all three counties. Because the Saginaw River is now being cleaned out it is practical that the Saginaw River can accommodate the increased flow from the Cheboyganing Creek. The cleaning out of the Cheboyganing Creek could have a major positive impact on the drainage district. ASAP

6/1/2011

$

3,000,000

The self cleaning trash rack was placed in the Gage Drain in 1981, just upstream of the pumping station, which has a capacity of 90,000gpm and has not been updated since installation. The drain is 7.0 miles long and drains approximately 4,000 acres of which 20% are residential parcels, 45% are commercial, and 35% agricultural. The district takes in approximately 16 miles of local roads, 1 mile of MDOT highway, and serves a portion of one of the most densely populated municipalities, Buena Vista Charter Township. The drainage district serves several schools, churches and municipal buildings crucial to the area. The trash rack debris removal is crucial to assure the maximum flow of water reaches the pumps. A pump station failure would cause flooding that would endanger life, property and a disruption of a densely populated area. The trash rack has an impact on the quality of water that is discharged into the Saginaw River which holds a huge economic stake in the local work force and the shipping of commerce in and out of the Saginaw Valley. The replacement would create local jobs in the design and construction phases and also h 4/1/2009

1/1/2010

$

588,600

u q e

Saginaw County

Blumfield Twp

i m

b u S Saginaw County

Buena Vista Charter Township

02262009

R d

e t tt

Cheboyganing Creek

Gage Trash Rack

Submitted Requests - Not Approved

417 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw County

Project Name

Project Description

Start Date

Saginaw

The publicly owned Dow Event Center is located in the heart of Saginaw Michigan. The facility contains the only 5,000+ seat arena in the Mid-Michigan area. Attached is a theater and conference hall. The Arena Floor supports several hockey events with its major tenant being the international Saginaw Spirit Hockey team of the Ontario Hockey League. The area floor is refrigerated and the floor and associated compressors/motors are in need of replacement. Engineering has been completed. Project if funding will start June 20, 2009. 1. Support Public Infrastructure – The arena floor is key to the recently revitalized yet economically challenged City of Saginaw. The floor serves all ice events. The Saginaw Spirit team is the main tenant the only minor league sports team in the area. 2. Create Jobs – The arena floor project will create many construction jobs in the greater Saginaw area. Saginaw’s unemployment rate is amongst the highest in the State of Michigan. Michigan is amongst the highest in the Country. These jobs will enable workers to work and Arena Floor Replacement - Dow Event Center spend. The project will employ dozens on labors in several trades. The project will pr 6/1/2009

Saginaw

The 40 year old, 6 level parking structure is in the heart of Saginaw Michigan. It’s deteriorated to where the top story is unusable. The remaining 5 levels future is in jeopardy. It needs new expansion joints, water removal system, lighting systems, elevators, handicap accessories, support lines and columns. Engineering firm has identified needs/costs. Work can begin May 1, 2009 1. Create Jobs – The project will create construction jobs. Saginaw’s unemployment rate is amongst the highest in the Nation. These new jobs will enable workers to work and spend. The project will employ hundreds of area workers via a dozen trades for up to 18 months. Also maintains Parking and Event Center Jobs. 2. Go Green on Energy – The 6th (top) floor is to be covered with solar panels with the goal to be energy self sufficient. All lighting, ticketing stations, elevators etc, will function via solar panels. Excess electricity from the solar panels will go to the publicly owned Event Center. Area will also include green space and be modeled after Green Roof Initiative. 3. Support Public Infrastructure – The parking ramp serves an economically challenged City in M 5/1/2009

A T

Saginaw County

s

t s e

City of Saginaw Parking Ramp

Expected Completion Date

O R

PP

Funding Request

Route (Infrastructure Only)

D VE $

910,000

10/1/2010

$

8,000,000

1/1/2010

$

303,100

O N

u q e

The self cleaning trash rack was placed in the Saginaw/Zilwaukee Drain in 1979, just upstream of the pumping station, which has a capacity of 90,000gpm and has not been updated since installation. The drain is 8.0 miles long and drains approximately 3,200 acres of which 50% are residential parcels, 20% are commercial, and 30% agricultural. The district takes in approximately 32 miles of local roads, 2 miles of MDOT highway, and serves a portion of four of the most densely populated municipalities, Carrollton Township, Kochville Township, Zilwaukee Township, and Saginaw Charter Township. The drainage district serves several schools, churches and municipal buildings crucial to the area. The trash rack debris removal is crucial to assure the maximum flow of water reaches the pumps. A pump station failure would cause flooding that would endanger life, property and a disruption of a densely populated area. The trash rack has an impact on the quality of water that is discharged into the Saginaw River which holds a huge economic stake in the local work force and the shipping of commerce in and out of the Saginaw Valley. The replac4/1/2009

R d

Saginaw County

02262009

i m

b u S

City of Zilwaukee

e t tt

Saginaw Zilwaukee Trash Rack

Submitted Requests - Not Approved

418 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw County

City of Zilwaukee

Project Name

Project Description

Start Date

The self cleaning trash rack was placed in the Universal Drain in 1984, just upstream of the pumping station, which has a capacity of 145,000gpm and has not been updated since installation. The drain is 6.0 miles long and drains approximately 4,000 acres of which 90% are residential parcels, and 10% are commercial and agricultural. The district takes in approximately 50 miles of local roads, 3 miles of MDOT highway, and serves a portion of three of the most densely populated municipalities, City of Zilwaukee, Carrollton Township, and Saginaw Charter Township. The drainage district serves several schools, churches and municipal buildings crucial to the area. The trash rack debris removal is crucial to assure the maximum flow of water reaches the pumps. A pump station failure would cause flooding that would endanger life, property and a disruption of a densely populated area. The trash rack has an impact on the quality of water that is discharged into the Saginaw River which holds a huge economic stake in the local work force and the shipping of commerce in and out of the Saginaw Valley. The replacement would create local jobs in the design and constructio4/1/2009

Universal Trash Rack

T O

Saginaw County

Saginaw County

Saginaw

02262009

t i m

S

ub

O R

P P A

The North West Utility Authority consists of pump stations for four communities that utilizes common force mains to transport wastewater to the City of Saginaw Wastewater Treatment Plant for treatment. This cooperative ___ has allowed Saginaw Charter Township, Kochville Township, City of Zilwaukee and Carrollton Township to pool their resources to operate this system. The flows from these four communities travel under the Saginaw River to the wastewater treatment plant. This 24” main is approximately 20 years old and the only means of the NWUA system to discharge to the Saginaw WWTP. If anything were to happen to this line, the results could be disastrous potentially discharging 8 to 12 MGD of raw sewage to the Saginaw River. Therefore, the authority is planning to construct a parallel force main of equal size that will not only provide the much needed redundancy for the system, but also relieve hydraulic bottlenecks in the system. This project would not only provide a safer environment for the public and the operators, improve the reliability of the station, but create jobs in the design and construction of the project. 6/1/2009

1/1/2010

Funding Request

qu

e R

Saginaw County 911/EOC/Sheriff expansion

t s e

The project would involve an addition to the existing Saginaw County Sheriff Department and the Saginaw County Communication Center building, which was built several years ago. The addition was initially motivated by the increasing communication demands and changes in technology as well as the need to update the system to a digital system. With an increase in staff in both the Sheriff’s Department and the 911 Call Center and evolving technology, an addition would accommodate the increased staff and house the machinery and equipment necessary to operate the 911 Call Center. In addition, the current Emergency Operations Center is located in a separate building. To facilitate response and coordination in a time of emergency, the EOC should be located with the 911 Call Center and the Sheriff’s Department. This would serve the new technolgy needs of central dispatch, the needs of the sheriffs department, and place the Emergency operations center in a location that would better facilitate communications. This project would involve a two story expansion of the current building. The construction of the building should be fairly straight forward a 4/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

N s

City of Zilwaukee, Carrollton Township, City of Saginaw NWUA River Crossing

d e tt

Expected Completion Date

467,500

9/1/2010

$

On Sherman from Schust to Center. On Center to 1st St, across the Saginaw River to the Saginaw 3,500,000 WWTP.

11/1/2009

$

1,730,400

419 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw County

Saginaw County

Saginaw Charter Township

Saginaw County

Project Name

Project Description

Saginaw County

McCarty Road Pump Station Replacement

Saginaw County Neighbor-hood Restoration

The Saginaw County Land Bank is established under Michigan Law. The purpose of the Land Bank is to return unused and delapidated properties back to the tax rolls. This is accomplished by acquisition, demolition, residential and commercial rehab, and returning land to Green Areas for future development. The project would purchase old and vacant delapidated homes and businesses, perform Phase I, II and BEAs in order to encourage development and improve neighborhoods in Saginaw County. Now-Immediate

Saginaw County Improvement Project

The Saginaw County Land Bank receives foreclosed properties on an annual basis. Michigan Law allows for Counties to hold these properties in a Land Bank. This Land Bank manages the use and re-use of these properties for the express purpose of neighborhood revitilization by re-use of formerly abandoned properties. The project would demolish buildings Countywide which are not repairable, help to establish designated Green Areas (Hospital District), acquire marginal homes and businesses to repair and re-use and restore neighborhood pride through landscaping and greening of previously unkept properties. $1.5 Million for Acquisition, Demolition and Rehab. $500,000 for Phase I, Phase II & BEA Now-Immediate

PP

2 Years

$

500,000

2 Years

$

1,500,000

Senior Center Building Renovation

The West Side Friendship Center is located in the City of Saginaw and serves Hispanic seniors who are at least 60 years old. The building is in need of repair to bring it up to code to meet ADA regulations such as installing automatic entry doors and renovating the bathrooms to allow for wheelchair access. The kitchen is also in need of repairs to bring it up to meet health code regulations. This center serves approximately 40 seniors each day and provides 100 home delivered meals each day to home bound elderly. The Friendship Center recently was forced to relocate and as a result, had to combine its center with the West Side Center. Based on the increased number of seniors now attending at this building site, the need to make it ADA compatible is crucial. Also, without the ability to bring the kitchen up to code, this center may need to also be closed. ASAP

$

42,000

$

22,000

$

4,000

A T

t i m

t s e

O N

qu

e R

Saginaw County

Saginaw County

Technology Infrastructure

The information system currently being utilized by the Commission on Aging and its l4 senior centers is inadequate. Many computers currently being utilized are outdated and unable to be upgraded. Only three of the l4 senior centers have a computer and thus the exchange of information between each center, the administrative offices, and the county government offices is hindered. New computers with adequate storage space and providing computers to those senior centers which currently do not have one will cut down on paperwork and streamline the information processes ASAP

Saginaw County

Saginaw County Airport

Harry Browne Airport Internet Access

Internet Access for Airport - currently using a customers internet

02262009

Submitted Requests - Not Approved

ASAP

ASAP

Route (Infrastructure Only)

D VE $

b u S

Saginaw County

O R

Funding Request

10/1/2010

d e tt

Saginaw County

Start Date

This is the main pumping station in the Northwest District of Saginaw Township. This pump station was originally built in 1970 and was upgraded in 1994. This station has a firm pumping capacity of 3,800 gpm. During wet weather events, this station has had to operate at its full capacity in order to try to handle incoming flows. There are additional areas in the service district under development that would require a 5,700 gpm capacity. The pump capacity is the limiting factor of the system because the current pumping capacity is less than the force main and trunk sewer capacities. Not only are there capacity issues, but there are more pressing safety, operation and maintenance issues. The current station is 35’ deep and operators have to ride an elevator in a confined space daily to check pump operation. The access in the station is very limiting and routine maintenance is not only difficult, but dangerous. By replacing the entire pump station with a submersible station with all of the controls and valves above grade, the safety risk can be eliminated and the operation and maintenance problems can be resolved. Not having adequate pumping capacity can r6/1/2009

s

Saginaw County

Expected Completion Date

1,800,000 NA

420 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Saginaw County

Saginaw County Airport

Harry Browne Airport Automobile for Pilots

Auto for Pilots/ Customer Use

Saginaw County

Saginaw County Airport

Harry Browne Airport Equipment Repair

Repair & Refurbish existing airport equipment

Saginaw County

Saginaw County Airport

Harry Browne Airport Front End loader

Front End loader for Airport Maint/repairs/upkeep/improvements

Saginaw County

Saginaw County Airport

Harry Browne Airport Dump Truck

Dump Truck for Snow Removal and Maintenance to the Property

Imerman Memorial Park Paving/Utilities Improvements

Imerman Memorial Park is adjacent to the Tittabawassee River and floods 1-3 times annually. Due to the age of the park and the constant abuse it takes from routine flooding, the roadways, parking areas and utilities are in great need of replacement. This project would include the demolition of existing bituminous drives and parking lots, earthwork, new pavement with concrete apron (for erosion control) and landscaping. In addition, the project would include installation of 2,328 LF of 6" PVC water main with tracer wire, three fire hydrants, and 3,290 LF of underground electrica in 2" conduit (for corrosive environments). 6/1/2009

Saginaw County

Saginaw Township

Expected Completion Date

ASAP

T O

ASAP

The 40 year old, 6 level parking structure is in the heart of Saginaw Michigan. It’s deteriorated to where the top story is unusable. The remaining 5 levels future is in jeopardy. It needs new expansion joints, water removal system, lighting systems, elevators, handicap accessories, support lines and columns. Engineering firm has identified needs/costs. Work can begin May 1, 2009 1. Create Jobs – The project will create construction jobs. Saginaw’s unemployment rate is amongst the highest in the Nation. These new jobs will enable workers to work and spend. The project will employ hundreds of area workers via a dozen trades for up to 18 months. Also maintains Parking and Event Center Jobs. 2. Go Green on Energy – The 6th (top) floor is to be covered with solar panels with the goal to be energy self sufficient. All lighting, ticketing stations, elevators etc, will function via solar panels. Excess electricity from the solar panels will go to the publicly owned Event Center. Area will also include green space and be modeled after Green Roof Initiative. 3. Support Public Infrastructure – The parking ramp serves an economically challenged City in M 5/1/2009

$

25,000

$

30,000

$

40,000

$

100,000

12/1/2009

$

502,000

10/1/2010

$

8,000,000

$

910,000

O R

P P A

Funding Request

D VE

Route (Infrastructure Only)

N s

Saginaw County

City of Saginaw, Saginaw County City of Saginaw Parking Ramp

t s e

qu

e R

The publicly owned Dow Event Center is located in the heart of Saginaw Michigan. The facility contains the only 5,000+ seat arena in the Mid-Michigan area. Attached is a theater and conference hall. The Arena Floor supports several hockey events with its major tenant being the international Saginaw Spirit Hockey team of the Ontario Hockey League. The area floor is refrigerated and the floor and associated compressors/motors are in need of replacement. Engineering has been completed. Project if funding will start June 20, 2009. 1. Support Public Infrastructure – The arena floor is key to the recently revitalized yet economically challenged City of Saginaw. The floor serves all ice events. The Saginaw Spirit team is the main tenant the only minor league sports team in the area. 2. Create Jobs – The arena floor project will create many construction jobs in the greater Saginaw area. Saginaw’s unemployment rate is amongst the highest in the State of Michigan. Michigan is amongst the highest in the Country. These jobs will enable workers to work and Arena Floor Replacement - Dow Event Center spend. The project will employ dozens on labors in several trades. The project will pr 6/1/2009

d e tt

t i m

ub

Saginaw County

City of Saginaw

Saginaw County

Saginaw County Airport

Harry Browne Airport Equipment Repair

Repair & Refurbish existing airport equipment

ASAP

ASAP

$

30,000

Saginaw County

Saginaw County Airport

Harry Browne Airport Front End loader

Front End loader for Airport Maint/repairs/upkeep/improvements

ASAP

ASAP

$

40,000

Saginaw County

Saginaw County Airport

Harry Browne Airport Automobile for Pilots

Auto for Pilots/ Customer Use

$

25,000

Saginaw County

Saginaw County Airport

Harry Browne Airport Internet Access

Internet Access for Airport - currently using a customers internet

$

4,000

S

02262009

Submitted Requests - Not Approved

421 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Section 19 Tuscola Saginaw County County Saginaw County Road Commission Birch Run Township

Project Name

Project Description

Reese Road County Drain

Clean existing inter county drain along east side of Reese Road from Truax Road to Tuscola Road. Project also consist of redigging and grading county drain to remove silt and sediments and to provide proper positive drainage from north to south in accordance with all construction plans and special provisions. Project will also include roadway, driveway and mainline culvert replacement with new culverts meeting drain commissioner requirements. Project will also consist of all soil erosion control measures. 4/1/2010

6/1/2010

Dixie Highway Reconstruction

Reconstruction of Dixie Highway from (South County Line to Birch Run Road)

7/1/2011

Birch Run Township, Saginaw County Road Frankenmuth Township, Commission and Bridgeport Township Dixie Highway Reconstruction Saginaw County Road Commission Bridgeport Township Dixie Highway Reconstruction Saginaw County Road Commission Saginaw County Road Commission Saginaw County Road Commission

Start Date

Expected Completion Date

Reconstruction of Dixie Highway from (Birch Run Road to I-75) Reconstruction of Dixie Highway from (I-75 to State Street)

7/1/2009

O R

Funding Request

D VE $

$

300,000

Dixie Highway 3,500,000 Reconstruction

7/1/2011

$

7/1/2009

7/1/2011

$

Dixie Highway 14,000,000 Reconstruction Dixie Highway 2,000,000 Reconstruction

7/1/2009

7/1/2011

$

Dixie Highway 6,000,000 Reconstruction

8/1/2009

8/1/2010

$

1,500,000 N/A

8/1/2009

8/1/2010

$

1,500,000 N/A

P P A 7/1/2009

Bridgeport Township and Buena Vista Township Dixie Highway Reconstruction

Reconstruction of Dixie Highway from (State Street to Saginaw City Limits)

Chesaning

Chesaning Satellite Garage

Reconstruction of Chesaning (District 3) Satellite Garage

Richland

Hemlock Satellite Garage

Reconstruction of Hemlock (District 4) Satellite Garage

Saginaw Depot Neighborhood Revitalization Project

Saginaw’s Potter St. Depot – on the National Historic Register – is the largest Victorian era depot in Michigan, and the center of a struggling but strong community on the edge of downtown. Its restoration and the economic revitalization of 6 blocks of Potter St., once a vibrant entertainment district, will lead to the redevelopment of the surrounding 30-block Depot District Neighborhood. SDPC’s District Revival plan, a model of historic and sustainable economic development, which had strong community involvement, is recognized by the city as important to its economic future. Two catalysts, a public/private Rail History Museum (which restores the Depot’s Power House) and a 400-seat theatre/concert hall, designed by Detroit’s Attic Theatre with Ann Arbor’s Ark, along with a dance studio and 12 arts studios, will be the initial economic generator, drawing audiences from a 50-mile radius. 4/1/2008

3/30/2010

$

500,000

Saginaw Future is launching an initiative called REAP - Renewable Energy Assistance Program, to promote the use of renewable energy and assist businesses, schools and government in implementing energy efficiency. SFI will be bringing retired automotive engineers, skilled trades and maintenance workers together to work as teams, tour business, school and government sites and make recommendations to reduce the useage of energy and become more energy efficient. REAP will also promote energy efficiency within schools and the community, provide leadership with local governments in preparing for renewable energy (zoning ordinances, building codes, etc.) and help prepare shovel ready sites for renewable energy investment. May 1 2009

Fall, 2009 with operations ongoing into the future $

1,800,000

s t s

T O

-N

Route (Infrastructure Only)

e u

Saginaw Depot Preservation Corporation

Saginaw

d e tt

t i m

Saginaw Future Inc.

ub

Saginaw Future Inc. 515 N. Washington in the City Renewable Energy Assistance Program of Saginaw, MI 48607 (REAP)

02262009

S

q e R

Submitted Requests - Not Approved

422 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

u S

Saginaw Charter Township

Saginaw Charter Township

02262009

Project Name

Project Description

Start Date

Expected Completion Date

Neighborhood Stabilization

Saginaw Charter Township would like to purchase ten percent of the foreclosed homes (approximately 6) within Census Tract 104.02. In 2006, Saginaw Charter Township had a total of 68 properties within it's 36 square miles that were in foreclosure. In 2008, Census Tract 104.02 had 62 properties in foreclosure. Saginaw Township would work cooperatively with Saginaw County Habitat for Humanity to purchase and rehabilitate the homes and market these affordable homes to new families. Proceeds from the sale would go towards purchasing and renovating additional homes with the intent of making the homes available to those at 60% of the area median income. The Township will work with Habitat to implement their Green Building and Renovations guidelines. 7/1/2009

Waverly Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

PP

O R 7/1/2010

Funding Request

D VE $

Route (Infrastructure Only)

650,000

12/1/2010

$

Passolt Road to 33,000 Glendale Road

Wood Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Vincent Road to 88,000 West

Joslin Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Vincent Road to 88,000 West

Burrows Green Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Easement - Vincent 88,000 Road to west

Lelia to Green Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Easement from Lelia Road to 154,000 Green Road

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Township limits to 158,200 west 1400'

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

W. Michigan to 165,000 Easement

A T

q e R

W. Michigan Ave. Water Main Replacement

itt

d e t

Leo Road Water Main Replacement

e u

st

s

O N

Green Acres Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Easement from Hemmeter to State 169,500 Street

Coolidge Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

Brockway Drive to 226,000 Montery Road

Pacelli Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

$

W. Michigan to 253,000 Easement

bm

Submitted Requests - Not Approved

423 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Charter Township

Saginaw Township

Saginaw Charter Township

Saginaw Township

Saginaw Charter Township

Saginaw Township

Saginaw Charter Township

Project Name

Coolidge Road Water Main Replacement

12/1/2010

Passolt Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

12/1/2010

Saulk Street Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

Brockway Drive Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

Brockway Drive Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

South Center Road Connection/Pathway

Installation of 2600 lineal feet of pathway to connect the existing Pedestrian system in Saginaw Charter Township to the Center Road Bridge and the Saginaw Valley Rail Trail. I 7/1/2009

Fortune Boulevard

This is a project identified in the Saginaw Area MPO 2035 Transportation Plan. This is also a project that was identified and prioritized in the 2027 Long Range Plan. This road is intended to preserve and protect the township’s existing commercial corridor by providing opportunity for denser, mixed use development as opposed to orthodox strip development. The property for this project was secured by the Township six years ago. 6/1/2010

02262009

T O

s t s

M-58 State Street Streetscape

q e R

Stretching across Saginaw Charter Township for 2.5 miles from the City of Saginaw to the Tittabawassee River, State Street/M-58 provides a connection with the City of Saginaw and the suburbs to the west. This commercial corridor has historically been the center of commercial activity in Saginaw Township. Many of the Township’s oldest businesses are located along State Street. With over 2,000 homes in the immediate vicinity, this built-in market of nearby rooftops and neighborhoods ensures the continued viability of State Street as a diverse and relevant commercial corridor. Anticipating that change and planning for it is the purpose of the Recreate State initiative. Because State Street – the M-58 state trunkline – acts as the “downtown” of Saginaw Township, business persons, community leaders, and Township officials have recognized the need to improve the overall appearance of the corridor and to focus on systematic improvements to State Street in order to achieve measurable and timely results. A community planning process, completed in November of 2008, recommended installation of a streetscape along this stretch of trunkline as well as ide6/1/2010

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

$

Montery Road to 282,500 State Street

$

Brockway Drive to 293,800 Montery Road

12/1/2010

$

Brockway to south 352,000 3200'

12/1/2010

$

Fromm Drive to 452,000 Trout Drive

12/1/2010

$

Trout Drive to 497,000 Passolt Road

7/1/2010

$

240,000

O R

P P A

-N

e u

t i m

b u S

Saginaw Charter Township

Start Date

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 1/1/2010

d e tt

Saginaw Township

Project Description

Expected Completion Date

D VE

10/1/2010

$

Extend, Fortune Boulevard north to Tittabawassee 1,500,000 Road

10/1/2010

$

Passolt to Midland 3,200,000 Road

424 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Township

Saginaw Charter Township

Project Name

Project Description

Start Date

Bay Road Pedestrian Improvements

Installation of approximately 16,000 lineal feet of sidewalk, one "countdown" pedestrian crossing signal, and two railroad crossings to ensure walking and biking are provided as an alternative mode of transportation in order to connect the neighborhood to its neighborhood school and provide an alternative for transit users and City residents. This one mile portion of Bay Road/M-84 is a state highway which physically connects the City of Saginaw and Saginaw Township, located between Weiss Street and Shattuck Road. Directly east of Shattuck and Bay Roads is Plainfield Elementary School, which serves the surrounding area including the west side of Bay Road. This neighborhood, Block Group 1 of Census Tract 104.1 is a mix of dwelling types ranging from single family to multiple family. The area is a divergen group of ages and families. According to the 2000 Census, 40% of the households are single person over the age of 60. Twenty percent of family households have children under the age of 18. This neighborhood is also home to one of the Township’s only age restricted and accessible apartment complexes. Many of the sen4/30/2009

Wieneke Road Pump Stations Upgrade

Saginaw Charter Township’s Southwest Wastewater Collection District is the largest of four districts in the township. The Wieneke/ Weiss sub district transports an average of 418,000 gpd. In 1986, three “wet weather relief stations” along Wieneke Road were built to provide relief. Barberry station handles flows from the area around Wienkeke and Shattuck; Weiss station handles flows from Weiss, east to Center and north to Heritage High School and George station handles flows from its immediate area, including M-58, and the other two stations. Gradually, the sub district’s area upstream has experienced, with increasing frequency, backups and basement floods during heavy rain and snowmelt events. This risk to health and safety is current and is increasing. During wet weather, the sewage’s hydraulic grade line has become unacceptably high and the stations’ current operating mode no longer helps. 7/1/2009

Saginaw Charter Township

P P A

O R

Funding Request

D VE

Route (Infrastructure Only)

M-84/Bay Road, between Weiss Street (City of Saginaw City Limit) 625,000 and Shattuck Road

9/30/2009

$

3/1/2010

$

1,265,000 M-58

36-inch Trunk Relief Sewer

Saginaw Charter Township’s Southwest Wastewater Collection District is the largest of four districts in the township. It was begun as a system in the 1960’s. Approximately 15,000 ft of the subject 36-inch trunk sewer carries all the collected wastewater from this 3,200 acre (9,200 connections) district into the township’s Southwest WWTP. It serves portions of M-46 and M-58. At build out, it is estimated that there will be 15,500 connections, an increase of 67%. Flow monitoring in the area and flow records indicate that the 36-inch trunk currently flows full during larger wet weather events, during summer’s high use times and has backed up into basements in the Frost Road area, a risk to health and safety. Continued growth and development in the Southwest District will exceed the capacity of this trunk’s capability, increasing risk to health and safety. SCT proposes to build approximately 15,000 feet of 36-inch relief trunk sewer roughly parallel to the existing trunk from the Lawndale (extended) Thistle area southerly to the WWTP. In addition, 1,800 feet of new 30-inch sewer would be built fro6/1/2009

9/1/2010

$

2,805,000 M-46 & M-58

Township Hall Remodel

Saginaw Charter Township hall was first constructed in the 1960s. The building has energy inefficiencies throughout - not only in relation to the age and equipment but in its design and layout. During the past year, the Township has secured an architect to review the building systems and make recommendations for improvements. Identified in the plans are new energy efficient lighting fixtures, HVAC improvements, windows and additional insulation. 7/1/2009

5/1/2010

$

Hemmeter Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 4/1/2009

12/1/2009

$

T O

Saginaw Township

Expected Completion Date

N s

t s e

u q e

R d

Saginaw Township

Saginaw Township

Saginaw Township

Saginaw Charter Township

i m

b u S

Saginaw Charter Township

Saginaw Charter Township

02262009

e t tt

Submitted Requests - Not Approved

355,000

State Street to 46,000 South 210"

425 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Township

Saginaw Township

Saginaw Charter Township

Saginaw Charter Township

Project Name

Project Description

Start Date

Expected Completion Date

Shattuck Road Water Main Replacement

Replace aging water main infrastructure that is undersized and deteriorating, with new water main. This will improve available fire flows, provide system reliability, and improve service to water customers. This project is on the Township's 10 year improvement plan. 4/1/2009

Public Safety Storage Building

With the higher gas prices this year and as a way to be more environmental and economically conscience, the Township sought a way to reduce gas prices and the effort and energy expended to maintain our fleet of police vehicles. For example, when the Township parking area needs to be plowed during the winter the employees must first start and move all the vehicles, plow, and then move them back. The Township is seeking funds to construct an enclosed storage building to house public safety vehicles. Construction of the building would result in less man hours for maintenance, but would importantly reduce the amount of time officers would leave their vehicles running in the winter. The building would be constructed using green building best practices in order to minimize impact. 5/1/2009

Saginaw Township Soccer Complex

The Saginaw Township Soccer Complex supports nearly 2,000 regional youth for soccer play, clinic and camps. This regional park and soccer complex holds several regional soccer tournaments each year. In 2008, visiting soccer teams contributed more than $3.5 million to our local economy (Michigan State University Economic Impact of Visitor Spending Survey). According to Penny Bailey at the Saginaw County Convention and Visitor’s Bureau, the 7-Eleven Tournament alone resulted in more than $1 million in local spending. “Soccer tournaments are a big economic boost to the area and we can host more if we increase the size of the facility and continue to aggressively market the venue. A typical family that travels to a multiple-day youth soccer tournament spends about $700, which means a team spends about $10,000 when it visits. Local families spend a lot at tournaments too -- about $200 on food, Tshirts, supplies and equipment. The average ''travel'' team has about 14 families and often friends and grandparents also follow the action,” she said. The additional green parking lot will hold 243 vehicles and equip the complex to hold more and larger tourn 4/30/2009

T O

12/1/2009

P P A

O R 10/1/2009

Funding Request

Route (Infrastructure Only)

$

Bay Road to 349,000 Barnard Road

$

800,000

D VE

N s

Saginaw Township

Saginaw Charter Township

Saginaw Township

Saginaw Charter Township

Saginaw Township Saginaw Township

Saginaw Township Saginaw Township Saginaw Township

Saginaw Township

Saginaw Charter Township Saginaw Charter Township Saginaw Charter Township

Saginaw Charter Township

02262009

$

Widen to three lanes

$

Fashion Square Boulevard to Bay 600,000 Road/M-84

Widen to five lanes, add a dedicated left turn lane along this Principal Arterial roadway. This road is adjacent to Covenant Medical Center, a regional medical center and bisects more than 500 acres planned for high tech and industrial development.

$

Widen to three lanes

$

Hemmetter Road

Widen to three lanes

$

Hemmeter Road

Widen to four lanes

$

Mackinaw Road

Widen to four lanes

$

Brockway to State 700,000 Street (M-58) State Street (M-58) 700,000 to Weiss Schust to McCarty 700,000 Road

Shattuck Road

Widen to four lanes. This section of roadway includes the collector road for a developing commercial corridor parallel to Bay Road/M-84 and the only elementary school within three miles and as well as the only elementary school east of Bay Road/M-84.

$

Bay Road/M-84 to Fashion Square 850,000 Boulevard

Tittabawassee Road

itt

Brockway Road

m b u

S

qu

McCarty Road, between Mackinaw 1,485,000 and Bay Roads

McCarty Road

Saginaw Charter Township Saginaw Charter Township

t s e

d e t

e R

Submitted Requests - Not Approved

8/1/2008

Mackinaw Road to 700,000 Center Center Road to 700,000 Wieneke Road

426 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Township

Saginaw Township/SMATS

Saginaw Charter Township

Saginaw Charter Township

Project Name

Project Description

Start Date

Expected Completion Date

Campus Business District

Installation of infrastructure within the Campus Business District, a high-tech, manufacturing, research and development zoning district of more than 300 acres. Located within eight miles of the expanded Hemlock Semiconductor expansion, the entire 500 plus acres are eligible for inclusion as an ANCHOR zone. The total project includes installation of approximately 9,000 lineal feet of 10” sanitary sewer and approximately 7,100 lineal feet of 12" to 6" water main, storm water management, and construction of a 1 1/2 mile road parallel to Tittabawassee Road to reduce congestion and isolate larger vehicles. Saginaw Charter Township and impacted property owners are financing the sanitary sewer installation at a cost of $1.3 million. The zoning district and area was developed to permit high-tech and green technology and related businesses. The zoning and development process is designed to take 30 days or less from submission to approval, with construction drawings submitted concurrently. Guidelines in place for this new area provide regulations and incentives for reducing impervious surface, the use of innovative storm water and landscaping te 4/30/2009

Fortune Boulevard

This is a project identified in the Saginaw Area MPO 2035 Transportation Plan. This is also a project that was identified and prioritized in the 2027 Long Range Plan. This road is intended to preserve and protect the township’s existing commercial corridor by providing opportunity for denser, mixed use development as opposed to orthodox strip development. The property for this project was secured by the Township six years ago. 6/1/2010

M-58 State Street Streetscape

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE $

Tittabawassee Road, west of 5,200,000 Center Road

10/1/2010

$

Extend, Fortune Boulevard north to Tittabawassee 1,500,000 Road

Stretching across Saginaw Charter Township for 2.5 miles from the City of Saginaw to the Tittabawassee River, State Street/M-58 provides a connection with the City of Saginaw and the suburbs to the west. This commercial corridor has historically been the center of commercial activity in Saginaw Township. Many of the Township’s oldest businesses are located along State Street. With over 2,000 homes in the immediate vicinity, this built-in market of nearby rooftops and neighborhoods ensures the continued viability of State Street as a diverse and relevant commercial corridor. Anticipating that change and planning for it is the purpose of the Recreate State initiative. Because State Street – the M-58 state trunkline – acts as the “downtown” of Saginaw Township, business persons, community leaders, and Township officials have recognized the need to improve the overall appearance of the corridor and to focus on systematic improvements to State Street in order to achieve measurable and timely results. A community planning process, completed in November of 2008, recommended installation of a streetscape along this stretch of trunkline as well as ide6/1/2010

10/1/2010

$

Passolt to Midland 3,200,000 Road

Installation of 2600 lineal feet of pathway to connect the existing Pedestrian system in Saginaw Charter Township to the Center Road Bridge and the Saginaw Valley Rail Trail. I 7/1/2009

7/1/2010

$

T O

N s

10/1/2009

t s e

Saginaw Township/SMATS

Saginaw Charter Township

Saginaw Township/SMATS

Saginaw Charter Township

Saginaw Township/SMATS Saginaw Township/SMATS

Saginaw Charter Township Saginaw Charter Township

Saginaw Township/SMATS

Saginaw Charter Township

Saginaw Township/SMATS

u q e

South Center Road Connection/Pathway

02262009

i m

240,000

Tittabawassee Road

Widen to five lanes, add a dedicated left turn lane along this Principal Arterial roadway. This road is adjacent to Covenant Medical Center, a regional medical center and bisects more than 500 acres planned for high tech and industrial development.

$

Brockway Road

Widen to three lanes

$

Mackinaw Road to 700,000 Center Center Road to 700,000 Wieneke Road

$

Fashion Square Boulevard to Bay 600,000 Road/M-84

$

Bay Road/M-84 to Fashion Square 850,000 Boulevard

ub

S

Saginaw Charter Township

e t tt

R d

McCarty Road

Widen to three lanes

Shattuck Road

Widen to four lanes. This section of roadway includes the collector road for a developing commercial corridor parallel to Bay Road/M-84 and the only elementary school within three miles and as well as the only elementary school east of Bay Road/M-84.

Submitted Requests - Not Approved

427 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Saginaw Township/SMATS Saginaw Township/SMATS Saginaw Township/SMATS

Saginaw Valley State University

Saginaw Valley State University

Saginaw Charter Township Saginaw Charter Township Saginaw Charter Township

Saginaw Valley State University, Kochville Township, Saginaw County, Michigan

Saginaw Valley State University, Kochville Township, Saginaw County, Michigan

Salem Housing C.D.C. Flint

Saline Fiddlers (listed with DLEG as Fiddle Ensemble Inc.)

Sanilac County Historical Society

Sanilac County Historical Society

Saline, MI

Port Sanilac

Start Date

Widen to three lanes

Hemmeter Road

Widen to four lanes

Mackinaw Road

Widen to four lanes

Health Sciences Building Phase II

This project would be an addition to a new Health Sciences project that is currently underway. The Health Sciences Building is a State of Michigan funded project. When completed, it will be a new home for the Departments of Nursing, Occupational Therapy, Health Sciences and Social Work. This project was requested over three years ago and has lost 20% to 25% of the planned purchasing power of the approved budget. In order to meet the originally planned program for the new building, several additions to the current plans would be included. This project would provide 10 additional classrooms, two computer labs, a movement analysis lab, parking, mechanical and electrical building equipment, and infrastructure system piping to connect to the Regional Education Building, a nearby structure. 4/15/2009

Funding Request

$

D VE $ $

T O

O R

P P A

Route (Infrastructure Only)

Brockway to State 700,000 Street (M-58) State Street (M-58) 700,000 to Weiss Schust to McCarty 700,000 Road

6/15/2010

$

5,000,000

Energy Conservation Measures

This project consists of the implementation of many energy conservation measures across campus. These measures have been outlined in a recently completed engineering study that has been underway for the past year. Over 170 individual items for energy conservation were identified in the study with an average payback of approximately four years. Most of these items are related to mechanical or electrical building systems. The items of work are spread across campus in many buildings. A sizeable portion of the work, however, will take place in Wickes Hall, an academic and administrative building on campus. This facility has mechanical, electrical and plumbing systems that are over 40 years old. These systems are very inefficient and in great need of repair. 4/15/2009

1/15/2010

$

6,000,000

Rehab: Green

Salem Housing will rehab and retro-fit using green technology on 15 homes per year in a focused service area on the north side of Flint involving homebuyers in the decisions and use of a home designed for for effective energy alternative energy use. 5/9/2009

on-going

$

1,500,000 x

Since 1994, the Saline Fiddlers have undeniably set the standard for extracurricular music programs in the United States. The group began with a simple idea: introduce an alternative style of music education to public school students. It has grown into a model of instruction and motivation that is being emulated across the nation. Yet more importantly, it is a brilliant example of what young adults can and will achieve if given a direction and the opportunity to explore, and pursue their own interests. already started

ongoing

$

200,000

Train Depot Project, Phase 1, Step 2

The former Deckerville train depot will be relocated to the Sanilac County Museum, refurbished and converted into a railroad museum. Phase 1, Step 2 is the relocation of the structure a distance of 16 miles and placement on the new foundation. 6/1/2009

9/1/2009

$

25,000

Train Depot Project, Phase 1, Step 1

The former Deckerville train depot will be relocated to the Sanilac County Museum, refurbished and converted into a railroad museum. Phase 1, Step 1 is the excavation and construction of a new cement and cinder block foundation to receive the structure.4/1/2009

6/1/2009

$

6,000

N s

t s e

u q e

R d

e t tt

i m

ub

S

Project Description

Hemmetter Road

Saline Fiddlers

Port Sanilac

02262009

Project Name

Expected Completion Date

Submitted Requests - Not Approved

428 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saugatuck Center for the Arts, Inc.

Saugatuck

Saugatuck Township

Saugatuck Township, Allegan County

Saugatuck Township

Saugatuck Township, Allegan County

Project Name

Project Description

Start Date

Expected Completion Date

Phase VI renovations to Art Center

Final phase of renovation to the Saugatuck Center for the Arts (green redaptive reuse of an abandoned pie factory) involves completion of the lobby, staff offices, gallery, plus key exterior renovations including installation of a new roof, repaving of parking lot, painting, and installation of exterior signage. Lobby renovation work focuses on use of natural lighting plus installation of energy efficient lighting, installation of energy efficient doors, recycled flooring product, and elimination of paper signage via installation of energy efficient electronic monitors. Re-roofing will maximize energy efficiency throughout the 23,000 sq ft facility. Gallery HVAC will be energy efficient. This final phase of capital work will employ a significant number of regional workers (short-term) while also creating stability for the organization thus ensuring long-term employment of Michigan artists (including other non-profit organizations) and SCA personel. These key activities will: 1) equip the SCA for long-term sustainability; 2) enable us to maximize our potential as a regional economic sparkplug and epicenter f 4/1/2009

Saugatuck Township Water Main Looping

8 inch watermain on 134th Avenue between 64th Street and Bluestar Highway which would eliminate a deadend and result in a continous flow of water which would provide increased fire protection flow and eliminate a stagnant water pocket which is detrimental to public health. 4/1/2009

Saugatuck Township Water Main Looping

PP

O R

Funding Request

D VE

7/7/2010

$

459,800

8/1/2009

$

119,000 NA

12 inch watermain on old Allegan Road which would eliminate a deadend and result in a continous flow of water which would provide increased fire protection and eliminate stagnant water which is detrimental to health. Approx. 4500 foot watermain. 4/1/2009

8/1/2009

$

345,000 NA

1/1/2010

$

1,500,000

A T

s

O N

SCCMUA

DeWitt Charter Township UV Disinfection

replacement of the existing chlorine gas disinfection system with ultraa violet treatment. UV is a safe effective disinfection system in use at numerous watewater and water treatment facilities throughout Michigan. The existing chlorine gas sytem requires the use handling and storage of a toxic chemical in the midst of a suburban residential area, which has surrounded the watewater facility since its construction.

SCCMUA

DeWitt Charter Township Tertiary Filter Improvement.

Construction of an isolation wall and replavement of the ventalation system to isolate the filter control system from the damaging atmosphere inheret to the filter system. June 1, 209

Sept. 1, 2009

$

150,000

Replacement with an improved design of the first two of four equalization mixing systems which have failed. The equalization basin controls the flow of wastewater throgh the treatment plant. Mixing keeps solids suspended and prevents shock loading of the solids handling process.

5/1/2009

7/31/2009

$

320,000

Replacement with an improved design of the second two of four equalization mixing systems which have failed. The equalization basin controls the flow of wastewater through the treatment plant. Mixing keeps solids suspended and prevents shock loading of the solids handling process.

5/1/2009

7/31/2009

$

320,000

Upgrade and improve energy efficiency of heating and lighting systems in selected District facilites as well as weather proof an attached mechanical support area.

4/1/2009

6/1/2009

$

100,000

Parking Improvements

Reshaping and adding to existing parking infrastructure through the use of recycled material. Project would include expanding parking areas adjacent to two instructural buildings to improve the safety and flow of both student and staff traffic, as well as, providing a covered canopy for the bus storage area. This facility would increase the safety of the drivers (slipping and falling hazards) and prolong the life of the busses by providing both some coverage from the weather. 4/1/2009

6/1/2009

$

125,000

Roof

Reroof the HS instructional building.

6/1/2009

$

150,000

SCCMUA

SCCMUA

DeWitt Charter Township Equalization Basin Mixing phase 1

itt

d e t

DeWitt Charter Township Equalization Basin Mixing phase 2

Schoolcraft Community Schools Schoolcraft

Schoolcraft Community Schools Schoolcraft Schoolcraft Community Schools Schoolcraft

02262009

bm Update

u S

Route (Infrastructure Only)

t s e

8/1/2009

qu

e R

Submitted Requests - Not Approved

5/1/2009

429 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Schoolcraft County

Manistique, Michigan

Project Name

Schoolcraft County Industrial Park

Schoolcraft County

Manistique, Michigan

Schoolcraft Township

Schoolcraft Township

Schoolcraft County jail NE Portion of Township Water Main & Sanitary Sewer

Schoolcraft Township

Schoolcraft Township

VW Ave. Water Main & Well House

Schoolcraft Township SEEDS

Schoolcraft Township Traverse City

The Preserves Sanitary Sewer NW Michigan Youth Corp

Shelby Township

Shelby Township

Shelby Township Shelby Township Shelby Township

Shelby Township

Shelby Township, Macomb County Shelby Township, Macomb County

Shelby Township, Macomb County Shelby Township, Macomb County Shelby Township, Macomb County

u S

Shelby Township, Macomb County

02262009

Van Dyke Sanitary Sewer

d e t

Water System Reservoir

itt

Project Description

Start Date

Schoolcraft County has the potential to attract or expand manufacturing companies that produce wood products and fabricated metal products, however we need to complete the development of our county industrial park in order to attract these companies to our community. The site requires water, sewer lines, electrical and broadband service, road construction and site restoration work. With the completion of the site, we would have the ability to create proper marketing materials and promote the park as building-ready. 9/1/2009

10/1/2010

$

386,000

8/15/2009

11/15/2011

$

1,700,384

8/15/2009

11/15/2010

$

2,106,445

6/15/2009 4/9/2009

11/15/2010 on-going

$ $

1,426,996 1,000,000

Construct 2 miles of a sanitary sewer along Van Dyke and Messmore to replace aged and failing septic fields that discharge septage into the waters of the State of Michigan, support businesses that may need to close as a result of failing setic fields and environmental concerns. 22 Mile to Nancy Street. 11/1/2009

6/1/2010

$

4,300,000

Construct a water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows. 24 Mile and M-53. 9/1/2009

5/1/2010

$

4,900,000

10/1/2009

$

300,000

10/1/2009

$

300,000

10/1/2009

$

350,000

11/15/2010

$

20,100,000

T O

-N

Water Main and Sanitary Sewer Extensions within 4 Sections of Township. Install water main along "VW" Avenue Water & Well House at the Township hall parcel

s t s

e u

The Preserves Sanitary Sewer Extension (18th St & XY Ave)

q e R

Justice Center

Construct a 90,000 sf Justice Center Building with 52,000 sf alocated to the Police and 38,000 sf alocated to the 41A district court, serving the communities of Shelby Township, Macomb Township and the City of Utica. Combining both departments into one building improves operational effeciencies between the departments and in building usage, and improves safety and security concerns at the courthouse. 24 Mile and van Dyke on Shelby Township property. 7/1/2009

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

P P A

Cured in Place Pipe, sectional

bm

Pipe Joint Grouting

D VE

850,000

Camp Manistique is a former State Correctional Facility which Schoolcraft County is currently in the process of aquiring from the State of Michigan. Schoolcraft County proposes to utilize this facility for the creation of a County Jail with the potential for regional jail expansion. The current Schoolcraft County Jail is out of compliance with State Regulations and needs to be replaced. A study conducted by national expert, Rod Miller, finds that the best option for a County Jail in Schoolcraft County is through reuse of the existing Camp Manistique Facility. Mr. Miller is also conducting a Regional Jail Study for the Upper Peninsula of Michigan. We are hopeful that through this study there will be identified needs which will result in regional collaboration in the reuse of Camp Manistique. The initial phase of construction calls for creation of a forty to fifty bed County Jail with expansion of up to 200 beds for regional use. Reconstruction costs of the Camp Manistique Facility are estimate at 3.5 million dollars whcih is roughly half the cost of new construction. Schoolcraft County Officials9/1/2009

10/1/2010

Funding Request

$

Line a 10, 12 and 30 inch pipe with cured in place pipe to correct structurally deficient pipes. Cured in place pipe eliminates costly restoration efforts associated with excavation to replace sewer lines. Melton, Hayes Road and Napi Drive. 5/15/2009 Grout Pipe joints to eliminate excessive infiltration, reduce DWSD costs for treatment and stablize pipe joints. 5/15/2009 Line short segements of sewer lines to elimenate infiltation, reduce DWSD treatment costs and stablize pipe joints. 5/15/2009

SRF, Cured in Place Pipe, full length

Expected Completion Date

430 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Shelby Township Shelby Township

Shelby Township, Macomb County Shelby Township, Macomb County

Shelby Township

Shelby Township, Macomb County

Shelby Township

Shelby Township, Macomb County

Project Name

Project Description

Start Date

Local Street, Asphalt resurfacing

Provide partial patching, full depth patching, slab replacement and reconstruction for approximately 45 miles of concrete roadways as identified the 2008 Concrete Street Evaluation for Shelby Township 7/1/2009 Resurface 78 miles of local asphalt streets identified in the Shelby Township 2008 Asphalt Road Evaluation and report. 7/1/2009

Sanitary sewer manhole rehabilitation

Rehabilitate existing manholes to reduce infiltration, improve flow channels and raise structures to existing grade to improve access to the sewer system during emergency situations. 5/15/2009

Sanitary Sewer Lead Reconnections

Reconnect 104 sanitary sewer service leads that are separating from the sanitary sewer. Separated service leads are showing signs of plugging that can lead to sewer back-ups. Various locations within the limits of Shelby Township. 5/15/2009

Local Street, Concrete Repairs and replacement

Shelby Township

Van Dyke Sanitary Sewer

Shelby Township

Shelby Township

Water System Reservoir

Construct a water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows.9/1/2009

Pipe Joint Grouting

Grout Pipe joints to eliminate excessive infiltration, reduce DWSD costs for treatment and stablize pipe joints. 5/15/2009

SRF, Cured in Place Pipe, full length

Line a 10, 12 and 30 inch pipe with cured in place pipe to correct structurally deficient pipes. Cured in place pipe eliminates costly restoration efforts associated with excavation to replace sewer lines. 5/15/2009

Cured in Place Pipe, sectional

Line short segements of sewer lines to elimenate infiltation, reduce DWSD treatment costs and stablize pipe joints. 5/15/2009

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

Shelby Township

T O

t i m

e u

eq

Construct a 90,000 sf Justice Center Building with 52,000 sf alocated to the Police and 38,000 sf alocated to the 41A district court, serving the communities of Shelby Township, Macomb Township and the City of Utica. Combining both departments into one building improves operational effeciencies between the departments and in building usage, and improves safety and security concerns at the courthouse. 7/1/2009

$

11,500,000

$

450,000

11/1/2009

$

800,000

6/1/2010

$

22 mile to Nancy 4,300,000 St.

5/1/2010

$

4,900,000 24 mile and M-53

$

Various locations within the limits of 300,000 Shelby Township

$

Melton, Hayes Road and Napi 300,000 Drive.

$

Various locations within the limits of 350,000 Shelby Township

10/1/2009

O R 10/1/2009

10/1/2009

10/1/2009

11/15/2010

$

24 mile and Van Dyke on Shelby 20,100,000 Township Property

11/15/2010

$

8,000,000 Community Wide

11/15/2010

$

11,500,000 Community Wide

10/1/2009

$

450,000 Community Wide

Various locations within the limits of 800,000 Shelby Township

Sanitary sewer manhole rehabilitation

11/1/2009

$

Summer, 2009

$

Shelby Township

Sanitary Sewer Lead Reconnections

Sherman Township

Sherman Township, Newaygo County, Michgian

Sherman Township Cemetery

Drill new well and build storage building for Sherman Township Cemetery

Submitted Requests - Not Approved

Summer 2009

8,000,000

D VE

Rehabilitate existing manholes to reduce infiltration, improve flow channels and raise structures to existing grade to improve access to the sewer system during emergency situations. 5/15/2009

Shelby Township

Route (Infrastructure Only)

$

Local Street, Asphalt resurfacing

Local Street, Concrete Repairs and replacement

Reconnect 104 sanitary sewer service leads that are separating from the sanitary sewer. Separated service leads are showing signs of plugging that can lead to sewer back-ups. 5/15/2009

02262009

11/15/2010

Funding Request

Provide partial patching, full depth patching, slab replacement and reconstruction for approximately 45 miles of concrete roadways as identified the 2008 Concrete Street Evaluation for Shelby Township 7/1/2009 Resurface 78 miles of local asphalt streets identified in the Shelby Township 2008 Asphalt Road Evaluation and report. 7/1/2009

b u S

Shelby Township

-N

R d

e t t

Justice Center

s t s

11/15/2010

P P A

Shelby Township

Construct 2 miles of a sanitary sewer along Van Dyke and Messmore to replace aged and failing septic fields that discharge septage into the waters of the State of Michigan, support businesses that may need to close as a result of failing setic fields and environmental concerns. 11/1/2009

Shelby Township

Expected Completion Date

40,000

431 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sherman Township Sherman Township

Shiawassee Arts Council

Sherman Township, Newaygo County, Michigan White Cloud, Michigan

Owosso

Project Name

Project Description

Start Date

Expected Completion Date

Robinson Lake Road Improvement White Cloud Area Fire Station

Paving Ransom and ParkLane roads at Robinson Lake, Sherman Township, Newaygo County Build a new fire station for White Cloud Area Fire Departmen

SAC Capital Improvement Project

The Shiawassee Arts Council (SAC), a non-profit organization established in 1972, began the Capital Improvement Project March, 2008 with completion target date of March, 2010. The project modernizes the 2,900sq.ft. Shiawassee Arts Center educational area for art classes --- insulation, lighting, heating, ADA accessibility, new entrance/exit, concrete floor, walls and doors, equipment and supplies. Many elementary school children in Shiawassee County do not have an art education program the expanded class offerings will help to fill that void in their educations. The project also includes retrofitting the second floor terrace using Green construction for better energy efficiency. The Arts Center building, which was built in the 1920's, is owned by the City of Owosso and is located in Curwood Castle Park along the Shiawassee River in downtown Owosso. The mission of SAC is to present quality arts and cultural activities that educate, entertain and enhance the quality of life in our community. The project benefits current SAC activities including exhibitions, receptions, meetings and classes and allows for new offerings including musical recita3/15/2008

Youth Options Training Program (YOTP)

Funding Request

$ $

64,000 800,000

3/15/2010

$

750,000

Youth Options Training Program. The purpose of the project is to support a newly implemented program designed to train in-need youth to build job skills, develop disciplined personal and work habits, and prepare them for potential employment and self-sufficiency. SmartShop Metal Arts Center developed the Youth Options Training Program to engage in-need youth from the greater Kalamazoo area in a metal working program to teach them the art and skill of welding and forging. They will develop artistic and vocational competencies and explore multiple career pathways in blacksmithing and the metal arts. The project structure would be to select four to six students at a time, repeated three times over the course of a year and a half, with each group developing their skills in three phases through 2009 and 2010. The program is designed to inspire personal growth and develop advanced employability skill in interested youth participants. History - SmartShop Metal Arts Center is an educationally driven organization that provides support and encouragement to anyone interested in the metal arts. Mission- (abbreviated) SmartShop Metal Arts Center's m 9/1/2009

1.5 years from start. Dec. 2010

$

40,260

This project is a priority to provide adequate public sewer and water to residents of Cedar and improve health and safety conditions. Cedar is a small unincorporated village in Solon Township, Leelanau County, Michigan which has historically experienced problems with private water and septic systems. Cedar is built on a moraine and is surrounded on 3 sides by wetlands. There was a Leaking Underground Storage Tank (LUST) site in the village, and other potentially contaminated sites are being researched under the County's EPA site assessment grants initiative. Historically, there have been many cases of cancer, as well as cancer related deaths in Cedar and the surrounding area - leading to suspicions of lingering and perhaps more extensive contamination problems. Because of setback requirements from existing wells and septic systems, current residents have no alternatives but holding tanks, and there are no opportunities for additional development of residential or commercial uses. Pumping costs for holding tanks average $250 per month and continue to escalate. Residents need a solution for a proposed sewer system whcih d5/1/2009

4/30/2011

$

2,250,000

Construct sanitary sewer around Howard Lake & Barton Lake to eliminate failing septic systems

11/15/2010

$

4,159,818

T O

2010

2011

P P A

O R

D VE

Route (Infrastructure Only)

N s

t s e

SmartShop Metal Art Center

Solon Township; & Leelanau County Brownfield Redevelopment Authority

Kalamazoo, MI

R d

e t tt

i m

b u S

Cedar, MI Solon Township Develop Public Sewer (and water) for Cedar

South County Sewer & Water Authority Schoolcraft Township

02262009

u q e

Howard Lake & Barton Lake Sanitary Sewer

Submitted Requests - Not Approved

8/15/2009

432 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

South County Sewer & Water Authority Schoolcraft Township

US 131 Corridor Sanitary Sewer

Construct sanitary sewer along the US 131 Corridor to serve the Village of Schoolcraft and businesses in Schoolcraft Township. 8/15/2009

11/15/2010

South County Sewer & Water Authority Schoolcraft Township

J Rettenmaier Water Main

Extend public water to J Rettenmaier in Schoolcraft Twp

8/15/2009

11/15/2010

South County Sewer & Water Authority Schoolcraft, Village

Village of Schoolcraft Sanitary Sewer (Village Construct sanitary sewer within the Village of Schoolcraft (Village Wide) to eliminate Wide) failing septic systems.

8/15/2009

11/15/2011

South County Sewer & Water Authority Schoolcraft Township

Portage Rd.-Gourdneck Creek Sanitary Sewer & Water Main Construct sanitary sewer and water main in Portage Rd under Gourdneck Creek

6/15/2009

South County Sewer & Water Authority Schoolcraft Township

Channel View Dr. Area-Sunset Lake Sanitary Install water main and sanitary sewer to the residents of the Channel View Dr AreaSewer Sunset Lake Sanitary Sewer

South County Sewer & Water Authority Schoolcraft Township

VW Ave. Sanitary Sewer

VW Ave Sanitary Sewer

Southeast Shores Business Incubation Network

The incubation network will allow artists and entrepreneurs access to space and equipment at a below market rate cost. At a time when credit is difficult to obtain, the incubation network can play a key role in allowing the entrepreneur's vision to be realized. By coordinating efforts with the Michigan Small Business Technology and Development Center--a division of the Small Business Administration (SBA)--we will work with entrepreneurs to develop comprehensive business plans. The incubation network will allow creative individuals access to: 1) Sewing Machines: Allowing for the manufacturing of clothing and other items. 2) Audio Recording Equipment: Allowing the aspiring artist, producer to record music. Also, the recording equipement can help churches and other organizations raise funds through disc sales. 3) Camcorders and Video Editing Equipment: Will allow aspiring video artists the opportunity to develop documentaries and other projects; and will provide the opportunity for young people to gain practical experience in video prodution; and the opportunity to oversee video projects from pre-production to post production. At a tim 4/2/2009

T O

Funding Request

$

8,400,000

D VE $

1,800,000

$

9,600,000

11/15/2009

$

268,800

6/15/2009

11/15/2009

$

1,457,799

6/15/2009

11/15/2010

$

4,156,200

7/13/2009

$

P P A

O R

Route (Infrastructure Only)

N s

Southeast Shores CDC

Mount Clemens

Southgate Downtown Development Authority Southgate, MI

Eureka Road Streetscape

Southwest Michigan Regional Sanitary Sewer and Water Authority

b u S

Lincoln Charter Township, St. Joseph Charter Hickory Creek Interceptor Rehabilitation Township Project

02262009

u q e

R d

e t t

t i m

t s e

This is a beautification project which includes the landscaping of the route described. 4/1/2009

10/1/2009

$

The Southwest Michigan Regional Sanitary Sewer & Water Authority (SMRSS&WA), which is comprised of Lincoln Charter Township, St. Joseph Charter Township and Royalton Township in Berrien County, is proposing a project to restore a quickly aging and susceptible 36" to 42" sanitary sewer interceptor line that serves all of these communities. The existing line is constructed mostly of Corrugated Metal Pipe (CMP) and was installed in the late 1960's. Discussions with the MDEQ have indicated that only a few other sewer lines were constructed of CMP, installed during the same time period, and have long since failed. This is the last know line of its type and has well exceeded its designed service life. The susceptibility of this line is a considerable concern to local officials and planning efforts for its rehab are underway. The interceptor collects wastewater from the Township collection systems and conveys it along Hickory Creek to the wastewater treatment plant located in the City of St. Joseph. The project is significant in size, is critical for the sustained economic development of the three Township area, will provide numerous jobs during constructi 5/15/2009

10/1/2009

$

Submitted Requests - Not Approved

117,000 N.A Eureka Road from Fort Street to Allen 1,500,000 Road

12,000,000 Hickory Creek

433 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Spaulding Township

Spaulding Twp.

Project Name

Project Description

Start Date

Expected Completion Date

Cass River Dike

Spaulding Township has a dike project that we have been working on since 1990. With using only local assessment funds we have built the dike on the north side of the Cass River from East Road/M-13 to Sheridan Road. East Road is a major highway for our township and South Saginaw County. Access to fire, police and emergency medical services is along this road. It has been determined that if a dike system is constructed along the Cass River to at least the 10 year design flood level, this major highway will be functional during most all flood situations. Most of the plans are ready for this section of the dike system and by April we could have the entire system ready to bid out; we simply have to complete final engineering calculations, The cost estimate for Phase 1 – construct the south dike from Sheridan Road to East Road/M13 – is approximately $1.2 million; Phase 2 – construct the dike from East Road on the south side of the Cass River west for 1.25 miles – is estimated at $1.3 million; and Phase 3 – extend the north dike system from East Road west to the City of Saginaw – Any Time is estimated at $1.6 million. We need approximately $4.1 million in financial assistanceShovel Ready

Cass River Dike

Spaulding Township has a dike project that we have been working on since 1990. With using only local assessment funds we have built the dike on the north side of the Cass River from East Road/M-13 to Sheridan Road. East Road is a major highway for our township and South Saginaw County. Access to fire, police and emergency medical services is along this road. It has been determined that if a dike system is constructed along the Cass River to at least the 10 year design flood level, this major highway will be functional during most all flood situations. Most of the plans are ready for this section of the dike system and by April we could have the entire system ready to bid out; we simply have to complete final engineering calculations, The cost estimate for Phase 1 – construct the south dike from Sheridan Road to East Road/M13 – is approximately $1.2 million; Phase 2 – construct the dike from East Road on the south side of the Cass River west for 1.25 miles – is estimated at $1.3 million; and Phase 3 – extend the north dike system from East Road west to the City of Saginaw – Any Time is estimated at $1.6 million. We need approximately $4.1 million in financial assistanceShovel Ready

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

8/1/2010

$

4,100,000

8/1/2010

$

4,100,000

NOWS North Ottawa Water System. Spring Lake Township is one of five communities that share a fresh water filtration plant. The plant has been running at over its approved capacity for several years and is need of expansion. The project was bid out several years ago, but the contract was not let for several reasons. One of those reasons was financial. The plans and bid specs have now been updated and 10/1/2009 subject could be advertised in the next 90 days. to funding 9/1/2012

$

24,000,000

Construction of 8" water main to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan. 7/9/2009

11/9/2009

$

100,000

Vinecrest - Oak Drive Water Main

Construction of 8" water main to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan. 7/9/2009

9/9/2009

$

100,000 Vinecrest

Pump Station No. 4 Rehabilitation

Rehabilitation to a pump station with new pumps, motors, controls and installation of a permanent standby generator. The Pump Station services the major industrial portion of the township. Rehabilitation will provide continued service the the industrial area. The project was identified in their 2008 wastewater capital improvement plan. 4/9/2009

10/9/2009

$

300,000

Pump Station No. 17 Rehabilitation

Rehabilitation to a pump station with new pumps, motors, controls and installation of a permanent standby generator. The Pump Station services the northeastern portion of the township. Rehabilitation will provide continued service to this area which includes residential and industrial users. The project was identified in their 2008 wastewater capital improvement plan. 4/9/2009

10/9/2009

$

300,000

T O

N s

Spaulding Township

Spaulding Twp.

City of Grand Haven/Spring Lake Spring Lake Township Township, O

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township

u S

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township

02262009

qu

d e t

Water Filtration Plant Expansion Project

itt

t s e

Highland Drive - Judson Road Water Main

bm

e R

Submitted Requests - Not Approved

434 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Spring Lake Township Spring Lake Township

Project Name

Project Description

Expected Completion Date

Start Date

Water Service Replacements

Spring Lake Township's water system consist of a large number of polybutylene services that have are in need of replacement. Services breaks have increased and the costs for these emergency repairs have led the Township to replace the "blue plastic" services throughout the Township with copper services. Approximately 900 services remain to be completed. The project was identified in their 2008 water system capital improvement plan. 4/9/2009

Submersible Pump Station Upgrades

Spring Lake Townships wastewater collection system consists of 8 submersible pump stations constructed in 1982 that are in the need of rehabilitation. Project to include replacement of pumps, motors and controls. The project was identified in their 2008 wastewater capital improvement plan. 7/9/2009

Fruitport Road - South Shore Water Main

Construction of 2,500 l.f. of 8" water main to connect dead end segments along Fruitport Road and the south shore of Spring Lake. Improvements to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan. 7/9/2009

Leonard Road Water Main

Construction of 2,100 l.f. of 12" water main to connect dead end segments along Leonard Road and across Lloyd's Bayou. Improvements to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan. 9/9/2009

D VE $

900,000

12/9/2009

$

750,000

11/9/2009

$

230,000 Fruitport Road

11/9/2009

$

300,000 Leonard Road

Pump Station Upgrades

Spring Lake Townships wastewater collection system consists of 15 packaged can stations constructed in the early 1980's that have been identified for the rehabilitation. Project to include replacement of pumps, motors and controls. The project was identified in their 2008 wastewater capital improvement plan. 10/9/2009

8/10/2009

$

3,600,000

Spring Lake Township, Spring Lake Township Ottawa County

Sewer Lift Station Replacement Project #2

Spring Lake Township has eighteen sanitary sewer lift stations that will need of replacement over the next 5 years. With approved grant funding or low interest loan 6/1/2009 subject funding, this project can be brought forward to 2009. to funding

9/1/2010

$

2,000,000

Spring Lake Township Spring Lake Twp

Wastewater

Wastewater

$

5,400,000 Yes

Tomahawk Ct and Hoffmaster Water Main

Construction of 1,100' of 8" water main to provide system reliability, improved fire flows as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan.

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township

Spring Lake Township Spring Lake Township Spring Lake Township, Spring Lake Township Ottawa County

i m

Sewer Lift Station Replacement Project #1

ub

S Springfield Township

Charter Township of Springfield

02262009

s t s

Davisburg Community Septic System

O R

P P A

-N

eq

e u

R d

e t tt

20" Lake Crossing Repair

T O

11/9/2009

Funding Request

Route (Infrastructure Only)

7/10/2009

$

150,000

Repair of 20" lake crossing servicing the Northern portions of the Township. Improvements to provide system reliability as recommended in their MDEQ reliability study. The project was identified in their 2008 water system capital improvement plan. 6/10/2009

10/10/2009

$

1,000,000

Spring Lake Township has two sanitary sewer lift stations that are in need of replacement. Both liftstations are under sized and need emergency power generation 4/1/2009 subject equipment to funding

9/1/2009

$

600,000

Davisburg is a historic downtown hamlet in the heart of Springfield Township. It is the intent of the Township, stated in the Township's Master Plan, to preserve these unique architectural characteristics and to encourage improvements (including exterior alterations and signage) that respect and enhance their historic character. However, the area lacks sanitary sewers and many of the septic systems are failing, which inturn limits redevelopment and reinvestment opportunities. The failing systems are negatively impacting the most substantial wetland system in Springfield Township. A package sewer system would greatly diminish the hurdle required for developers to reinvest in Davisburg. The Township's Capital Improvement Plan has identified this project as a high priority. 7/1/2009

7/1/2010

$

350,000 Davisburg Road

Submitted Requests - Not Approved

4/10/2009

435 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Springfield Township

Springfield Township

Springfield Township

Springfield Township

Charter Township of Springfield

Charter Township of Springfield

Charter Township of Springfield

Charter Township of Springfield

Project Name

City of St. Clair

Tawas City

St. Clair

Dixie Highway Corridor Improvements

Dixie Highway Sewer Installation

Installation of a sanitary sewer system on Dixie Highway (US-24) from Davisburg Road to the Independence Township boundary. Dixie Highway is the main commercial corridor through Springfield Township and installation of sanitary sewer would encourage quality commercial and mixed-use development. Installation of sewers is supported by the Township's Capital Improvement Plan and has been identified as a high priority project.

7/1/2009

D VE

Dixie Highway (US2,000,000 24)

7/1/2011

$

Dixie Highway (US2,000,000 24)

Parks & Recreation Improvements

The Township has identified as a high priority in the Capital Improvements Plan and Parks & Recreation Plan to make substantial improvements to the Township's parks. The parks and open space in Springfield Township are a significant amenity that the Township wants to preserve and enhance. 5/1/2009

5/1/2010

$

Installation of Township multi-use trails

The Township has identified priority areas that safety paths and multi-use trails in the Township's Master Plan. Linking residential areas, parks, schools and other community facilities, and shopping areas is essential in order to encourage alternative transportation. In response to demand for pathway linkage systems, Oakland County Planning Department prepared the Headwaters Trail concept Plan for northwestern Oakland County. The plan proposes to link via a pathway system state and county parks and other major open space areas in the region. This project supports the goals of Oakland County to develop Countywide pathways. Additionally, this project is listed as a high priority in the Capital Improvement Plan. 5/1/2009

5/1/2011

$

2,000,000 Township Wide

Expansion/renovation of existing 20 year old Emergency Room

Total cost of the project is $9.5 million to update and expand a 20 year old 5,000 sq ft Emergency Room to 13,000 sq ft. The expansion would allow our facility to meet the growing needs of our community, improve patient and associate safety and efficiency with the latest technology. In order to expand the ER, the Oncology Dept would have to be moved to the second floor. Currently our automated medication dispensing units are too large to fit in existing medication rooms and have to be stored in open bays. There is no privacy for patients, cardiac monitoring have to be done with bay curtains open. ER disaster supplies and equipment is stored outside the dept and are not easily accessible. Current net sq ft of the existing room/bays is only 75-137 sq ft. The trauma room is severely undersized at 135 sq. ft. The new plans would expand the size of the rooms to approximately 700 sq.ft. In addition the lobby, registration, and the working areas for the physicians and staff would double giving privacy to the patients and the care givers. The total dollars included in the costs above includes mo7/9/2009

8/11/2009

$

9,500,000

Bike Path Extension

Construct 0.85 Miles of bituminous bike path from the end of an existing path at Fred Moore Highway at 15th Street to the downtown area 8/1/2009

ub

City of St. Clair

St. Clair

Floating Dock and Fishing Pier

City of St. Clair City of St. Clair

St. Clair St. Clair

Sanitary Sewer Repairs Barrier Free Kayak Access and Dock

02262009

O R

Funding Request

Route (Infrastructure Only)

$

t i m

S

Start Date

Dixie Highway is currently a 5 lane principal arterial going through Springfield Township. The Township has identified the goal of improving the physical characteristics of the corridor in both the Township's Master Plan and Capital Improvement Plan. Intersections may require realignment and the corridor requires new signage and traffic signals. The improvement of Dixie Highway is a high priority. It is the Township's intent to encourage physical improvements to Dixie Highway roadway in such a way as to facilitate the smooth and safe flow of traffic, improve vehicular and pedestrian safety, and help to promote the image of Dixie Highway as an entryway into the Township. 7/1/2009

d e tt

St Joseph Health System

Project Description

Expected Completion Date

T O

P P A

N s

t s e

qu

e R

New floating dock and fishing pier Line and/or replace deteriorated sanitary sewer lines recently indentified by CCTV Inspection Construct barrier free access dock to a barrier free kayak launch

Submitted Requests - Not Approved

7/1/2011

11/15/2009

250,000 Davisburg Road

$

Fred Moore Hwy 15th Street to 250,000 Clinton Rotary Park - south of Clinton, west of 175,000 M-29

4/15/2009

8/15/2009

$

4/15/2009 8/1/2009

11/15/2010 11/15/2009

$ $

2,000,000 City Wide 75,000 Municipal Marina

436 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of St. Clair

St. Clair County

St. Clair County

St. Clair County

St. Clair County

St. Clair County

St. Clair County

St. Clair County

St. Clair County

St. Clair County

St. Clair

Project Name

Project Description Replace existing deteriorated pavillion with a new pavillion, install radient heat and lights along with retractable wind curtains

Pavillion Replacement

Expected Completion Date

Start Date 8/1/2009

11/15/2009

All within St. Clair County, specifically Ira and Casco Twp's Ira/Casco Twp 2 Mile Water Main Project

Ira Twp is in the process of getting funding for a 2 mile water main project that will deliver water to the residents of Ira and Casco Twps. This project has been engineered and is in the process getting funding for a portion of this project. St. Clair County is looking at getting funding for half of this project to cover the Casco Twp portion of the water main lines. Aug/Sept 2009

Capac, MI, St. Clair, MI and Port Huron Twp, MI

800 Mhz Communications System

This is the last phase of our 800 Mhz Communications system. We would construct a communications tower in the western area of St. Clair Co. and also build a microwave hop from our Sheriff's Office to the tower in Goodells, MI, as well as put a microwave antenna system on the top of the water tower in St. Clair to improve communications along our border with Canada. The project is ready to go, but on hold due to lack of funding for the project. 4/1/2009

Hazmat Storage Building

The County is in need of a new facility to store the emergency and/or hazmat equipment which is currently being stored in the main hanger of the St. Clair County International Airport. The airport is putting forth bids for an FBO and the hanger is considered part of the contract. The building will be a 30,000 s.f. facility. The project will be started once the funding is determined.

Maintenance Building - Intervention Center

The Intervention Center is in need of storage to hold the maintenance supplies for the building as there is not enough room for the supplies in the main building due to the large quantity ordered. The building will be located next to the Intervention Center andEarly Summer will be 1,200 s.f. 2009

Intervention Center Storage Building

Kimball Twp., MI

Port Huron Twp, MI

Port Huron Twp, MI

Port Huron, MI

Port Huron, MI

Port Huron, MI

02262009

$

75,000 Municipal Marina

D VE

30-60 days from Start

$

1,250,000

$

3,750,000

$

1,138,500

6 months from start

$

151,800

The County is in need of an Evidence/Compound Storage Building with a security fence around it to store vehicles, boats or other large items which have been seized either because it is evidence or the item may be forfeited due to drunk driving. The building will be a 4,800 s.f. building with security lighting and a security fence around Early Summer the building. The project will be started once the funding is determined. 2009

6 months from start

$

518,650

The County Building & Grounds Department is in need of a facility to store their vehicles and equipment. Currently the Maintenance equipment is being stored in the old jail which will be torn down when the funding is available. The building will be 1,840 s.f. with offices and a shop. Summer 2009

9 months from start

$

231,242

The County is looking to repair/reconstruct the main entrance of the Port Huron Library. The building canopy, footings and foundation are starting to deteriorate due to old age. The County needs to get this project accomplished soon due to the liability issues that any falling debris and walkways may cost the county. Summer 2009

4-6 months from start

$

81,592

Day Treatment/Night Watch New Building

The County is looking to build a new Day Treatment/Night Watch facility as the curren facility was built in the 1930's and the repairs needed to remain up to codes will be costly to the County. The County is looking at building this facility near the Intervention Center which houses the Juvenile Center. The Child Care fund can be utilized to pay a portion of this project, however, the County would still need to find Early Summer funding for the remaining portion. 2009

12 to 18 months from start

$

1,500,000

Abatement and Demolition of Old Jail

The old County Jail is not suitable for renovation as there is asbestos, lead, etc. which would have to be abated prior to any renovation projects. The County has conducted an environmental assessment of the building which estimates that abatement would cost $350,000 and demolition/site improvements would cost $650,000. The other environmental issue is that this building is located less than 200 feet from the St. Clair Early Summer River which feeds into the Great Lakes. 2009

6 months from start date

$

1,000,000

A T

e t t

St. Clair County Library Entry Repair/Reconstruction

t i m

s

t s e

O N

u q e

Submitted Requests - Not Approved

O R

PP

R d

Library Maintenance Building

b u S

Port Huron Twp, MI

Funding Request

Route (Infrastructure Only)

10/31/2010

437 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Clair County

St. Clair County

Project Name

Project Description

Start Date

The current Health Department building is in such a state of disrepair that the repairs to the building are getting to be costly. Significant facility problems include roof leaks, mold, air handling and electrical issues, sewer backups, handicap access, and space limitations for programs. The plan is to build a new facility for the Health Department Late Summer which will add space to expand programs and correct these issues. 2009

Port Huron, MI

Health Department Building

Port Huron, MI

The Annex Building is in a state of disrepair that makes it too costly to make the repairs to make the building usable. The County has had a consultant assess the building for asbestos abatement. The County is planning on abating the asbestos, demo the building and convert the land into additional parking for the general public. The other environmental issue is that this building is located less than 200 feet from Early Summer Abatement and Demolition of Annex Building the St. Clair River which feeds into the Great Lakes. 2009

St. Clair County

St. Clair County/ Kimball Twp.

St. Clair County/Kimball Twp

Funding Request

9,000,000

3 months from start date

$

450,000

Expansion of the St. Clair County Airport Runway

St. Clair County International Airport is proposing a 1200 foot extension to our main Instrument Landing System Runway 4/22, from 5100 feet to a total of 6300 feet. The airport is rapidly becoming a very important factor in the growth of the County of St. Clair. This runway extension would increase airfreight demands, Commercial Corporate travel, General Aviation, US Customs and Border Protection flights, Trans Atlantic International Flights, Medivac/Lifeline flights, and Commercial operations within the Air Industrial Park. Flight operations of this type operate under various restrictions. The length of the current ILS runway 4/22 puts a limit on inbound and outbound aircraft. Therefore, limiting the amount of cargo and corporate flights in and out of St. Clair County. Lengthening this runway would allow cargo and corporate aircraft demands to grow generating economic activity for St. Clair County. An increase of aircraft traffic into St. Clair County International Airport will also increase employment opportunities. 6/1/2009

6/1/2011

$

15,000,000

Rehabilitate Runway Drainage System

This project consists of reconstruction of the existing storm sewer and inlet structures. The existing drainage system is over 50 years old and is not functioning well, creating soil erosion that has started to compromise the Runway Safety Area. This project will restore the life of the drainage system and the integrity of the runway asphalt itself. 6/1/2009

7/1/2009

$

480,000

9/30/2010

$

7,000,000

N s

st

e u

eq

P P A

O R

Route (Infrastructure Only)

D VE

16 months after start date

$

T O

St. Clair County

Expected Completion Date

R d

i m

e t tt

St. John's Health

Novi, MI

02262009

b u S

Computerized Provider Order Entry Providence Park Hospital

Computerized Provider Order Entry (CPOE): This project would design, build and implement a house-wide CPOE solution for Providence Hospital and Medical Center. This 200-bed facility services the Novi and surrounding communities. Traditionally, providers (physicians, residents, mid-level providers, etc.) interact with the patient and then write a series of paper-based orders that will be communicated to the various departments over a matter of hours usually by a Hospital Unit Clerk. CPOE pushes the electronic ordering directly into the hands of the provider. This project will deploy evidence-based clinical protocols, order sets and clinical decision support prompts that will guide the caregivers through their complete ordering process including medications, laboratory tests, imaging services and other consultative services. St. John Health has been working in partnership with other Ascension Health Ministries to identify and develop leading practices for improving overall patient care. It is this work that St. John Health will build upon to develop the complete CPOE solution. This functionality allows for the following patient benefits: - Allows clinical decision support 9/1/2009

Submitted Requests - Not Approved

438 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. John's Health

Southfield, MI

Project Name

Project Description

Start Date

Computerized Provider Order Entry Providence Hospital and Medical Center

Computerized Provider Order Entry (CPOE): This project would design, build and implement a house-wide CPOE solution for Providence Hospital and Medical Center. This 459-bed hospital facility is the largest employer in Southfield consisting of more than 4,000 staff members, 1,151 physicians and more than 400 active volunteers dedicated to healing the bodies and touching the souls of thousands each year. Traditionally, providers (physicians, residents, mid-level providers, etc.) interact with the patient and then write a series of paper-based orders that will be communicated to the various departments over a matter of hours usually by a Hospital Unit Clerk. CPOE pushes the electronic ordering directly into the hands of the provider. This project will deploy evidence-based clinical protocols, order sets and clinical decision support prompts that will guide the caregivers through their complete ordering process including medications, laboratory tests, imaging services and other consultative services. St. John Health has been working in partnership with other Ascension Health Ministries to identify and develop leading practices for improving overall patient care. 9/1/2009

PP

O R

Funding Request

$

9,000,000

Detroit

Electronic Health Record - St John Hospital and Medical Center

Electronic Health Records: Complete the implementation of an Electronic Health Records (EHR) system at St. John Hospital and Medical. This Detroit-based 607 licensed beds acute care facility has a 1200-member medical staff and more than 50 medical and surgical specialties. This project includes the creation of a clinical data warehouse, order processing systems, results viewing, Pharmacy Information Systems, Emergency Department Information System, and Health Information Management (Medical Records). This program will improve the overall quality of patient care within Detroit and Southeast Michigan by: - Providing care that is based on structured on-line clinical documentation, and implementation of research-based clinical protocols. - Providing care givers with clinical decision support alerts and reminders, - Improves the quality of Emergency Department medical records which support improvements in care for the under-insured population - Improving medication safety by providing legible, portable documentation on-line including allergies and other drug alerts - Eliminates paper-based records that come into the organization from2/2/2009

9/30/2009

$

15,000,000

Detroit

Computerized Provider Order Entry (CPOE): This project would design, build and implement a house-wide CPOE solution for St. John Hospital and Medical Center. This Detroit-based 607 licensed beds acute care facility has a 1200-member medical staff and more than 50 medical and surgical specialties. Traditionally, providers (physicians, residents, mid-level providers, etc.) interact with the patient and then write a series of paper-based orders that will be communicated to the various departments over a matter of hours usually by a Hospital Unit Clerk. CPOE pushes the electronic ordering directly into the hands of the provider. This project will deploy evidencebased clinical protocols, order sets and clinical decision support prompts that will guide the caregivers through their complete ordering process including medications, laboratory tests, imaging services and other consultative services. St. John Health has been working in partnership with other Ascension Health Ministries to identify and Computerized Provider Order Entry - St. John develop leading practices for improving overall patient care. It is this work that St. John Health will build upon to develop the complete CPOE solution. This functionality 5/1/2009 Hospital and Medical Center

9/30/2010

$

12,000,000

s

t s e

Route (Infrastructure Only)

D VE

9/30/2010

A T

St. John's Health

Expected Completion Date

O N

u q e

R d

St. John's Health

e t tt

i m

ub

S 02262009

Submitted Requests - Not Approved

439 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. John's Health

Project Name

Project Description

Start Date

East China Township, MI Electronic Health Record - River District

Electronic Health Records: Complete the implementation of an Electronic Health Records (EHR) system at St. John River District Hospital. This 68 licensed beds acute care facility located in East China Township services Algonac, Marine City and St. Clair and four surrounding townships. This project includes the creation of a clinical data warehouse, order processing systems, results viewing, Pharmacy Information Systems, Emergency Department Information System, and Health Information Management (Medical Records). This program will improve the overall quality of patient care within Detroit and Southeast Michigan by: - Providing care that is based on structured on-line clinical documentation, and implementation of researchbased clinical protocols. - Providing care givers with clinical decision support alerts and reminders, - Improves the quality of Emergency Department medical records which support improvements in care for the under-insured population - Improving medication safety by providing legible, portable documentation on-line including allergies and other drug alerts - Eliminates paper-based records that come into the org7/1/2009

Southeast Michigan: Detroit Southfield Macomb Warren Novi St. Clair Cardiology Systems

Cardiology Information System: Implementation of an enhanced Cardiology Information Systems that will allow access to critical cardiology procedures and results across the continuum of care. Quick access to a patient's history during a clinical event can dramatically impact the clinical outcomes. This program will provide Southeast Michigan with: - Creation of 10+ new jobs and/or protection of existing jobs. Includes information technology specialists, trainers, software engineers, clinicians, and other administrative support staff. - Improve the overall wellness for patients in Southeast Michigan through the improved outcomes and management of cardiology patients - Significant reduction in paper/film-based medical records resulting in reduction in paper products, storage locations, transportation costs. 5/1/2009

Southeast Michigan: Detroit Southfield Macomb Warren Novi St. Clair Brighton Patient Centered Medical Home

Patient Centered Medical Home: St John’s Health (SJH) proposes to create a unified data repository coupled with patient management tools for all SJH patients and related information originating across the continuum of care. This would be a proof point for a commercially viable interoperable data exchange linking data from Hospitals, Physician Offices, Clinics, Ambulatory Diagnostic and Treatment Centers, Home Health, and most important – patients and their support structure. The fundamental test of success will be the ability for a patient’s data to be available in the proper context at any time or place care is delivered. This will be a new generation of enabling tool that optimizes the capabilities and benefits of a medical home and functionally be the virtual component of that home. This project would be built in conjunction with software partners utilizing existing products to minimize the time for deployment. Additionally, such an effort would be done in concert with major portal partners in order to most effectively deploy access in a rapid fashion to the broader community. This project with create 10 new jobs within the Information Technology sp8/1/2009

Laboratory Information System: St. John Health's Laboratory Services Division consists of 6 hospital laboratories, 5 satellite laboratories and 21 services centers that service Southeast Michigan. In support of the laboratory outreach program, the current Laboratory System is being enhanced. This upgrade will bring the laboratory system up to current software release levels which will improve vendor support, ensure continued support and will bring new functionality. The new features of the upgrade will enable the implementation of improved patient safety measures and workflows that will increase laboratory efficiency and decrease cost, particularly for outreach processing. 8/1/2009

T O

St. John's Health

St. John's Health

d e tt

t i m

b u S

St. John's Health

Southeast Michigan: Detroit, MI Macomb Warren St. Clair

02262009

Laboratory Information Syetem - Upgrade

P P A

O R 6/30/2010

Route (Infrastructure Only)

D VE 8,000,000

$

10,000,000

9/30/2010

$

25,000,000

1/31/2010

$

3,600,000

N s

Submitted Requests - Not Approved

Funding Request

$

st

e u

q e R

Expected Completion Date

440 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. John's Health

Southeast Michigan: Southfield Novi

Project Name

Project Description

Laboratory Information System - Upgrade

Start Date

Expected Completion Date

Laboratory Information System: St. John Health's Laboratory Services Division consists of 6 hospital laboratories, 5 satellite laboratories and 21 services centers that service Southeast Michigan. In support of the laboratory outreach program, the current Providence Laboratory System is being enhanced. This upgrade will bring the laboratory system up to current software release levels which will improve vendor support, ensure continued support and will bring new functionality. The new features of the upgrade will enable the implementation of improved patient safety measures and workflows that will increase laboratory efficiency and decrease cost, particularly for outreach processing. 6/1/2009

D VE $

100,000

6/30/2010

$

10,000,000

$

9,000,000

P P A

Electronic Health Records: Complete the implementation of an Electronic Health Records (EHR) system at St. John Macomb-Oakland Hospital. This 587 licensed beds acute care facility services both Macomb and Oakland couties. This project includes the creation of a clinical data warehouse, order processing systems, results viewing, Pharmacy Information Systems, Emergency Department Information System, and Health Information Management (Medical Records). This program will improve the overall quality of patient care within Detroit and Southeast Michigan by: Providing care that is based on structured on-line clinical documentation, and implementation of research-based clinical protocols. - Providing care givers with clinical decision support alerts and reminders, - Improves the quality of Emergency Department medical records which support improvements in care for the underinsured population - Improving medication safety by providing legible, portable documentation on-line including allergies and other drug alerts - Eliminates paperbased records that come into the organization from other providers and incorporates t 7/1/2009

T O

O R 9/30/2009

Funding Request

Route (Infrastructure Only)

N s

St. John's Health

Warren, MI Madison Hts, Electronic Health Record - Macomb & MI Oakland Hospitals

St. John's Health

Computerized Provider Order Entry (CPOE): This project would design, build and implement a house-wide CPOE solution for St. John Macomb-Oakland Hospital. This 587 licensed beds acute care facility services both Macomb and Oakland couties. Traditionally, providers (physicians, residents, mid-level providers, etc.) interact with the patient and then write a series of paper-based orders that will be communicated to the various departments over a matter of hours usually by a Hospital Unit Clerk. CPOE pushes the electronic ordering directly into the hands of the provider. This project will deploy evidence-based clinical protocols, order sets and clinical decision support prompts that will guide the caregivers through their complete ordering process including medications, laboratory tests, imaging services and other consultative services. St. John Health has been working in partnership with other Ascension Health Ministries to identify and develop leading practices for improving overall patient care. Warren, MI Madison Hts, Computerized Provider Order Entry - St. John It is this work that St. John Health will build upon to develop the complete CPOE solution. This functionality allows for the following patient benefits: - Allows clinical de7/1/2009 MI Macomb - Oakland Hospital

9/30/2010

Clinical Foundation Suite - EHR

To aid in a total healthcare quality transformation, St. Joseph's would like to implement an electronic heath record (EHR) that will be a secure, real-time, point-ofcare, patient centric information resource. Phase 1 will be the creation of the central data repository, involving integration existing departmental systems. Functionality will include Results Viewing for Laboratory and Radiology results, Physician transcribed progress notes, and a new, integrated Pharmacy system. This implementation is on hold due to the current economic climate. We anticipate that 2 fulltime jobs will be created in Information Technology for build and support purposes. The cost of 2 million 3/9/2009

9/10/2009

Lab System

The current lab system is nearing end of life , in order to provide safe healthcare to the population of Tawas which will improve reporting of result to the physician. This project will add two fulltime jobs in information technology for build and support purpose. This will also add one permanent fulltime position with in the lab. The cost of this project 2.5 million. 3/9/2009

3/10/2009

t s e

u q e

St. Joseph Health System

St. Joseph Health System, Tawas

R d

e t tt

i m

b u S

Tawas, Michigan

Tawas, Michigan

02262009

Submitted Requests - Not Approved

441 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Joseph's Health System`

Tawas City, MI

St. Mary's of Michigan Saginaw

Project Name

Project Description

Start Date

Clinical Foundation Suite - EHR

To aid in a total healthcare quality transformation, St. Joseph's Health System would like to implement an electronic heath record (EHR) that will be a secure, real-time, point-of-care, patient centric information resource. Phase 1 will be the creation of the central data repository, involving integration existing departmental systems. Functionality will include Results Viewing for Laboratory and Radiology results, Physician transcribed progress notes, and a new, integrated Pharmacy system. This implementation is on hold due to the current economic climate. We anticipate that 2 fulltime jobs will be created in Information Technology for build and support purposes. The cost of 2 million dollars. 3/9/2009

Medical Center Renovation-Main CampusDowntown Saginaw

Renovation of Medical Center Main Campus to expand ED, add Rehabilitaiton unit an consolidate ICU to improve access and qualilty of patient care. 7/1/2009

$

33,000,000

$

250,000

6/1/2011

$

16,000,000

St. Mary's of Michigan is in the process of building an electronic heath record (EHR) that will be a secure, real-time, point-of-care, patient centric tool for our clinicians. Working with our vendor partners we have built the foundation of this clinical tool. The next phase of implementation is on hold due to the current economic climate. Key applications that will be implemented as part of this Grant include: Order Entry, CPOE Clinical Documentation, Electronic Signature, Prescription Writer and Secure Health Messaging. These applicaitons provide closed loop medication administration, legible order communications and real-time clinician access to vital patient information, creating a quality driven patient care environment. The centralized electronic record will eliminate duplication of testing and data gathering within our patient care continuum, a great satisfier for physicians and patients alike. This project will create 3 new full time jobs within the Healthcare Information Technology space, with more jobs likely in the Patient Care areas. St. Marys is a mid michigan leader in the care and ser 3/9/2009

3/11/2009

$

24,000,000

St. Mary's of Michigan is in the process of building an electronic heath record (EHR) that will be a secure, real-time, point-of-care, patient centric tool for our clinicians. Working with our vendor partners we have built the foundation of this clinical tool. The next phase of implementation is on hold due to the current economic climate. Key applications that will be implemented as part of this Grant include: Order Entry, CPOE Clinical Documentation, Electronic Signature, Prescription Writer and Secure Health Messaging. These applicaitons provide closed loop medication administration, legible order communications and real-time clinician access to vital patient information, creating a quality driven patient care environment. The centralized electronic record will eliminate duplication of testing and data gathering within our patient care continuum, a great satisfier for physicians and patients alike. This project will create 3 new full time jobs within the Healthcare Information Technology space, with more jobs likely in the Patient Care areas. St. Marys is a mid michigan leader in the care and ser 3/1/2009

3/1/2011

$

24,000,000

P P A 4/1/2009

7/1/2009

Route (Infrastructure Only)

D VE

2,000,000

T O

St. Mary's of Michigan Standish

O R 12/10/2009

Funding Request

$

Purchase foreclosed, vacant properties and rehabilitate existing properties in the Cathedral District surrounding the main campus for expansion of existing programs, Cathedral District Neighborhood Revitalization Greenhouse, Crxsp, Healthy Futures, Employer Assisted Home Buyer program to /Stabilization stabilize and revitalize the neighborhood surrounding the medical center. Renovate and expand space of existing facility to create a permanent structure to Standish Hospital Rural Health Clinic deliver health care services in a medically underserved area.

St. Mary's of Michigan Saginaw

Expected Completion Date

N s

t s e

St. Mary's Of Michigan Saginaw Saginaw Michigan

b u S

St. Mary's Of Michigan Saginaw Saginaw Michigan

02262009

R d

Clinical Foundation Suite - EHR

e t tt

i m

Clinical Foundation Suite - EHR

u q e

Submitted Requests - Not Approved

442 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

St. Mary's Of Michigan Saginaw Saginaw

St. Mary's Of Michigan Saginaw Saginaw

St. Mary's Of Michigan Saginaw Saginaw

Project Name

Project Description

Start Date

Data Center Renovation

St. Mary's of Michigan proposes the building of a new Data Center using industry standard technology. This will enable St. Mary's to maintain and deliver consistent, high standard healthcare information tools to end users by supporting the complex integration required. The current data center has reached its maximum potential and will not support additional growth as St. Mary's moves toward an EHR. This project will create 4 new jobs within the Information Technology arena. St. Mary's is a MidMichigan leader in the care of the poor and underserved. This grant will facilitate the delivery of quality patient care throughout the areas we serve. The cost of this project will be 1.5 million dollars. 10/9/2009

Cooling system renovation

St. Mary's of Michigan proposes to renovate the current technology data center and replace obsolete and inefficient cooling systems. The data center houses all of the computer servers, network equipment, etc. needed to support current information systems across the hospital. This project will cost $150,000 to complete.

Nursing Automation

St. Mary's of Michigan proposes the implementation of an integrated Nursing communication system that will coordinate voice communications, nurse call and electronic bed information. This will facilitate improved patient safety by providing an automated way to communicate Nurse and Patient location, status and requirements for quality and safe patient care. This project will create Nursing satisfaction and assist St. Mary's in retaining quality nursing personnel to care for our patients. The cost of this project will be $750 thousand dollars.

Emergency Department Renovation

The expansion project for the Emergency Department is critical to future growth and success of St Mary’s of Michigan as a healthcare ministry. The expansion will positively impact the population that St Mary’s of Michigan serves, as well as stay abreast of direct competition. The plan provides increased local community patient access as well as a primary point of access as a referral / trauma center. The capital for this project is estimated at $10,834,063. The expansion of the Emergency Department, as well as the continued growth of St Mary’s of Michigan Ambulatory Care Center, will offset the actions our direct competitor has taken. St Mary’s of Michigan has a trauma program that is recognized as the regions leader when compared to the major competitor in our area. St Mary’s of Michigan Emergency room serves the inner city of Saginaw and the surrounding 11 counties as a regional referral center. The Emergency department will grow from 16 to 26 treatment rooms, observation unit from 6 to 12 beds and provide ICU overflow. The plan encompasses updates to patient and family rooms and a security department within the Emergency

T O

s t s

Expected Completion Date

O R 9/10/2009

P P A

-N

Funding Request

Route (Infrastructure Only)

D VE $

1,500,000

$

150,000

$

750,000

$

30,000,000

$

2,000,000

e u

d e tt

St. Mary's Of Michigan Saginaw Saginaw

t i m

b u S

St. Mary's of Michigan Standish Hospital Standish, MI

02262009

Electronic Medical Record

q e R

To aid in a total healthcare quality transformation in Michigan, St. Mary's of Michigan Standish Hospital would like to implement an electronic health record (EHR) that will be a secure, real-time, point-of-care, patient centric information source. Phase 1 of the project will be the creation of the central data repository, involving integration of existing departmental systems. Functionality will include Results viewing for Laboratory and Radiology, Physician transcribed progress notes, and a new integrated Pharmacy system. This implementation is on old due to the current economic climate. We anticipate that 2 fulltime jobs will be created and sustained in the Information Technology department for build and support purposes. Funding for the project would be 2 million dollars. 3/9/2009

Submitted Requests - Not Approved

9/10/2009

443 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Mary's of Michigan Standish Hospital Standish, MI

St. Mary's of Michigan Standish Hospital Standish, MI

Project Name

Project Description

Start Date

Laboratory System

St. Mary's of Michigan Standish Hospital requires a new laboratory information system (LIS) to replace the current system that is outdated technology that cannot integrate to other systems. To provide safe, quality patient care, and to provide laboratory result information to the proposed EHR and the physician community, the old system must be replaced. Due to the current economic situation, we have been unable to find private funding for this venture. We anticipate that jobs will be lost if laboratory services have to be moved to another provider. The new system would allow the hospital to maintain its current staff. Funding for this project would be 1.2 million dollars 4/1/2009 St. Mary's of Michigan Standish Hospital requires a new hospital information system (HIS) to continue to support patient registration, tracking, billing and scheduling functions. The current system is out of date an no longer supported by the vendor. A new HIS that would be able to integrate with the EHR is being requested. New positions are not planned, however, the system replacement will keep existing employees at work. St. Mary's. St. Mary's is the leading source of healthcare in the Standish area, and we are a leader in supporting the poor and underserved. This project will cost 3 million dollars to complete. 5/9/2009 The purchase of a Reverse 9-1-1 Mass Notification System used to notify residents of emergency circumstances through the telephone system. 5/9/2009

T O

Sterling Heights

Sterling Heights

Hospital Information System Replacement Public Safety Equipment - Mass Notification System

Sterling Heights

Sterling Heights

Energy Conservation & Efficiency - LED Lights Retro-fitting City facility parking lot lights & street lights to LED.

Energy Conservation & Efficiency - Roof Replacement Energy Conservation & Efficiency - HVAC, Lighting in City Buildings Energy Conservation & Efficiency/Public Safety Equipment - Generator

-N

4/9/2009

9/9/2009

$

500,000

The replacement of the 20-year old roof on the Police Station and Public Library, and the 15-year old roof on the 41-A District Court, which are falling apart and leaking, with new roofing and insulation for energy efficiency. 3/9/2009

6/9/2009

$

175,000

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Public Safety Equipment - Fire Training Tower Structural repairs to the City's 19-year old fire training tower to correct mold problems, Repairs repair cracked bricks, repair windows, fix leaking roof and rusted stairwell. 3/9/2009 Road Maintenance Equipment - Street Sweeper Replacement of 13-year old Street Sweeper with new Waterless Street Sweeper. 3/9/2009 Road Maintenance Equipment - Tandem Axle Replacement of 17-year old dump truck with new Tandem Axle Dump Truck w/Snow Snow Plow Plow & Spreader to meet federal mandated emmission standards. 3/9/2009 Road Maintenance Equipment - Front End Loader Replacement of a 16-year old Front End Loader. 3/9/2009

Sterling Heights

Purchase of (9) Salt Brine Spreaders for snow plows, which will reduce the quantity of Environmental Road Maintenance Equipment -salt needed on roads and melt ice at a lower temperature, which will improve road Salt Brine Spreaders safety conditions. 4/9/2009

Sterling Heights

u S

02262009

itt

5/11/2009 100,000

s t s

e u

To retro-fit HVAC and lighting systems in City facilities. To install a back-up emergency generator in City Hall to continue emergency operations during black-outs. Replacement of (2) 20- & 21-year old Fire Trucks with EPA emmission upgrades to meet federal mandated emmission standards.

3/9/2009

11/9/2009

$

500,000

3/9/2009

7/9/2009

$

250,000

3/9/2009

12/9/2009

$

1,040,000

To replace (45) 8-year old Mobile Data Computers in all Police Vehicles.

3/9/2009

6/9/2009

$

300,000

4/9/2009

6/9/2009

$

175,000

4/9/2009

9/9/2009

$

200,000

7/9/2009

$

60,000

6/9/2009

$

240,000

6/9/2009

$

150,000

6/9/2009

$

220,000

6/9/2009

$

720,000

q e R

Replacement of 7-year old vital 9-1-1 Main Computer System used 24 hours/day in Police Dispatch, including the server, computers, and monitors. To upgrade, from analog to digital, the 20-year old outdoor Emergency Warning Sirens, which are failing and have outlived their useful life.

bm

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

Sterling Heights

d e t

1/11/2009

Funding Request

8/9/2009

Sterling Heights

Public Safety Equipment - Police 9-1-1 Computer System Public Safety Equipment - Emergency Warning Sirens

O R

P P A

Sterling Heights

Public Safety Equipment - Fire Trucks Public Safety Equipment - Mobile Data Computers

Expected Completion Date

444 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Replacement of 14-year old Sewer Jet with new Sewer Jet w/Heat Box (for use in cold Sewer weather) to be used in Sanitary Sewer Cleaning Program to help prevent sewer backups. 3/9/2009

Sterling Heights

Sterling Heights

Sewer Maintenance Equipment Jet

Sterling Heights

Sterling Heights

Storm Water Improvements - Storm Sewer Lift Station Pump Repairs

The replacement of (4) 35-year old storm sewer lift station pumps and electrical panels needed to prevent neighborhood flooding and improve safety conditions.

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Sterling Heights

Neighborhood Street Resurfacing (assumed not to be federal TIP dollar eligible) Sidewalk Infrastructure & Transit Improvement - Sidewalk Gap Technology & Resource Workflow Automation - Digital Document Imaging

Four miles of Neighborhood Road Resurfacing to repair potholes, cracks, and crumbling road surfaces. This will also help to increase residential property values. 4/9/2009 To complete sidewalk installation where pedestrian traffic is impeded due to gaps in the sidewalk. 4/9/2009 To digitize public records and streamline and increase document retention automation and workflow, to achieve efficiency savings. 3/9/2009

Sterling Heights

Reimbursement to City for Partial Property Value Decline - Budget Deficit Elimination

Sterling Heights

Sturgis Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township

Sturgis Township Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp

Summit Township Summit Township Summit Township Summit Township Summit Township Summit Township

Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp Summit Twp

Superior Township

02262009

$

D VE $

2,500,000

$

1,500,000

12/9/2009

$

450,000

Due to declining City tax base, the City will lose $20 million in tax revenue over a three year period. Seeking $4 million to reduce loss of full-time positions to continue to provide vital City services including Police, Fire, and Public Works. 3/9/2009

3/9/2009

$

4,000,000

Township Hall improvements Street Lighting Fire Engine Horton Rd Area Sewer Floyd Avenue Sewer South Jackson Rd Sewer Spring Arbor Rd & Robinson Rd. Sewer North Side Sewer Park Dr Sewer South Street Sewer Frogtown Sewer Garden City Sewer Walnut Lane Sewer Wireless/Interconnect Expansion Kimmel Rd Mun Water Loop Non-motorized Trails Retrofit Non-motorized Trails New Southwest Area Mun Water Main Station #3 Township Vehicles Mun Water Reliability Improvement and VFD Pump Conversion #1 Sewage Lift Station Retro-fit DPW Addition Paint Water Tower Horton Rd Lift Stn Retrofit 340 Farms Mun Water Pump

The project includes leveling of the existing lot, hauling in stone to make a sound base, compacting the stone, then completely covering with asphalt. Installing bumper stops, and also paving markers to show parking spots, handicap areas, etc. Also to install a fence on the north edge of the parking area along US-12. The fence to be about 3 feet in height and made of material that will allow for the use of the same type stone as the face of the Township Hall. 5/1/2009 Replace obsolete luminaires 7/1/2009 Replace obsolete engine 7/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Install mun water loop for reliability 8/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Install sanitary sewer system 8/1/2009 Add/Replace Mobile Data Computers & offsite backup 7/1/2009 Install mun water loop for reliability 8/1/2009 Upgrade 3.5 miles to current stds. 7/1/2009 Construct 5.04 miles of new trails Install mun water main 8/1/2009 Remove 2nd Floor 4/1/2009 3 alternative fuel vehicles for twp business 6/1/2009

8/1/2009 12/1/2009 7/1/2010 12/1/2009 1/1/2010 1/1/2010 12/1/2009 1/1/2010 12/1/2009 2/1/2010 4/1/2010 4/1/2010 2/1/2010 12/1/2009 12/1/2009 11/1/2009 11/1/2009 4/1/2010 10/1/2009 8/1/2009

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

80,000 75,000 525,000 862,500 870,100 900,000 990,000 1,185,000 1,237,500 1,398,000 1,797,500 1,822,500 2,400,000 330,000 1,200,000 1,750,000 2,500,000 3,978,000 85,000 100,000

Add two back up generators & convert 15 pumps to soft start. Add third pump 1000 s.f. Addition Re-paint wet and dry areas of tower Install larger pump motor Upgrade mun water well pump

10/1/2009 8/1/2009 12/1/2009 12/1/2009 8/1/2009 9/1/2009

$ $ $ $ $ $

475,000 200,000 100,000 150,000 100,000 115,000

Stamford Road Trunk Sewer Rehabilitation

Rehabilitation of approximately 1900 feet of 15-inch sanitary sewer, including localized pipe replacement, root cutting, cleaning, pipe lining, and MH rehabilitation. From MacArthur Bld. Southeast along Stamford Road behind apartments, through the woods. 4/1/2009

7/1/2009

$

270,000

e t tt

i m

t s e

u q e

Submitted Requests - Not Approved

O R

P P A

N s

6/1/2009 5/1/2009 5/1/2009 6/1/2009 5/1/2009 5/1/2009

11/9/2009

11/9/2009

Route (Infrastructure Only)

230,000

720,000

T O

7/9/2009

Funding Request

$

ub

Superior Township, Washtenaw County

6/9/2009

4/9/2009

R d

S

Expected Completion Date

445 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Superior Township

Superior Township, Washtenaw County Superior Township, Washtenaw County

Project Name

Project Description

Start Date

Expected Completion Date

Township Facility Improvements

Miscellaneous upgrades to various Township facilities including, energy saving improvements to buildings, upgrade of parking facilities to porous pavements, upgrading outdated HVAC systems to high efficiency ones, stormwater quality improvements

8/1/2009

8/1/2010

Water Storage Facility

Installation of 1 million gallon water storage facility

8/1/2009

9/1/2011

Superior Conservation Corps (SCC)

The Superior Conservation Corps (SCC) is an established summer employment program for young adults (ages 15-24) that serves the Upper Peninsula of Michigan (15 counties) and accomplishes a wide variety of natural resource conservation projects on local, state, federal and tribal lands. The SCC also has an energy conservation program that provides home energy assessments for low income families and the elderly. The SCC provides young adults with job skills training, environmental education and a strong work ethic. Stimulus funding would be used to expand the program to additional youth and young adults. Specific natural resource conservation projects include but are not limited to; Great Lakes pollution prevention, dune restoration, stream restoration, erosion control, native plant reintroduction, invasive species removal, creating public hiking trails and public access sites. Expanding the Superior Conservation Corps helps meet specific regional, state and national challenges such as safeguarding the environment; improving energy efficiency, increasing public access opportunities on local, state, tribal and federal land5/1/2009

Funding Request

Route (Infrastructure Only)

$

1,000,000 N/A

$

3,725,000

4/30/2011

$

625,000

Energy and Natural Resources/Habitat Restoration: The Lake Superior Critical Dune Restoration Project will use native plants (beach grass, shrubs and trees) to restore sensitive Great Lakes dune habitat at a heavily used public access site adjacent to the AuTrain River and Lake Superior in Alger County, Michigan. In addition, the proposed project will create wind breaks to prevent blowing sand from accumulating at the mouth of the AuTrain River that each year causes ice jams and flooding of nearby residential homes. Related damages include reduced property values of affected homes and numerous insurance claims and repair bills due to flooding basements and septic systems. Sand accumulation at the mouth of the AuTrain River has caused the river mouth to migrate east, where it has severely eroded the dunes and bluff and threatens Michigan State Highway M-28, which is now located less than 60 feet away from the river. The proposed project will prevent further accumulation of sand at the river mouth and will also mitigate maintenance costs associated with blowing sand that fills in parking areas at a heavily used public access site and rest stop. Annually, a5/1/2009

4/30/2011

$

125,000

Energy and Natural Resources/Habitat Restoration: The Lake Superior Critical Dune Restoration Project will use native plants (beach grass, shrubs and trees) to control severe erosion and create wind breaks to prevent blowing sand and snow that threatens public safety along two sections of Michigan State Highway M-28 immediately adjacent to Lake Superior in Marquette County, Michigan. The proposed project will protect public safety by controlling blowing sand and snow which each winter closes state highway M-28 (8,100 cars per day) due to lack of visibility. Another public safety concern associated with the road closures is the inability of emergency vehicles (police, fire, ambulance) to use this section of highway due to periodic closures that result in a 42 mile (or more) detour. According to the Michigan Department of Transportation (MDOT), road closures occur in this area at least once Superior Watershed Lake Superior Critical Dune Restoration and per year and up to 6 times annually (avg. 2 closures per year lasting approx. 8 hours). Partnership (NGO/501 City: Marquette Township: Hazard Mitigation Project, Marquette County, Annually, almost 3 million cars drive past this site (MDOT) with many visitors stopping to rest at the three scenic turnouts/Lake Superior beach access sites. In addition to pu5/1/2009 c 3 non-profit) Chocolay Michigan

4/30/2011

$

125,000

Superior Township

Superior Watershed Partnership (NGO/501 Upper Peninsula of c 3 non-profit) Michigan (15 Counties)

T O

O R

D VE

P P A

N s

t s e

Superior Watershed Partnership (NGO/501 City: AuTrain (Village) c 3 non-profit) Township: AuTrain

u q e

R d

Lake Superior Critical Dune Restoration and Hazard Mitigation Project, Alger County, Michigan

e t tt

i m

b u S

02262009

Submitted Requests - Not Approved

446 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Energy and Natural Resources/Wildfire Hazard Reduction: The Luce County Wildfire Mitigation Project will mitigate the occurrence of wildfires in Luce County, Michigan by 1) Creating defensible space around at-risk structures (vegetative management) in prioritized population use risk areas and hazard fuels areas; and 2) Providing information and education to landowners, recreational users and the public. Luce County experiences a high incidence of wildfires that threaten public and private property, close county and state roads, interrupt commerce and threaten public safety Luce County has averaged almost seven wildfires a year for the last twenty years including the most recent Sleeper Lake Fire that consumed over 18,000 acres and cost over $6 million to control. According to the Michigan Department of Natural Resources Newberry Fire Unit, certain areas of Luce County have the potential to hos Superior Watershed major wildfires due to fuel types, fuel loadings, response times, access (remote Partnership (NGO/501 Luce County, All Cities, All locations), increased human activity, increased number of structures, and weather c 3 non-profit) Townships Luce County, Michigan Fire Mitigation Project patterns. The Luce County Firewise Committee has identified and evaluated these are5/1/2009

T O

Marquette County, City of Ishpeming, City of Negaunee, City of Marquette, Ishpeming Superior Watershed Township, Negaunee Partnership (NGO/501 Township, Marquette Superior Wind Power: Clean Alternative c 3 non-profit) Township Energy for the Upper Peninsula of Michigan

Energy and Natural Resources/Renewable Energy Research Development, Demonstration and Deployment: The Superior Wind Power Project will be constructed in Marquette County, Michigan and provide clean alternative energy and employment opportunities for residents of the Upper Peninsula of Michigan. The Superior Wind Power Project will generate up to 525,600 megawatt hours annually and will dramatically reduce carbon dioxide emissions, conserving water and diversifying Michigan’s energy portfolio. Directly, the Superior Wind Park will create a minimum of 10 permanent jobs. These jobs will be full-time positions offering competitive salaries. The project will also create up to 340 indirect jobs in the manufacturing, construction and maintenance sectors. The Superior Wind Park stands to create significant economic, social and environmental value for the State of Michigan. The project furthers the pollution reduction (i.e. mercury, carbon dioxide, sulphur dioxide, etc.) goals and recommendations of numerous state, federal and international planning documents including the Lake Superior Lakewide Management Plan (LaMP). The proj 5/1/2009

S

02262009

Funding Request

Route (Infrastructure Only)

D VE

4/30/2011

$

315,000

4/30/2011

$

1,200,000

4/30/2011

$

4,300,000

N s

t s e

qu

e R

t i m

ub

Superior Watershed State of Michigan, All Partnership (NGO/501 Counties, All Cities, All c 3 non-profit) Townships

O R

P P A

Education and Workforce/Youth Program: The Michigan Youth Conservation Corps (MYCC) will consolidate and expand four established regional summer youth programs into one state-wide employment program for Michigan youth and young adults (ages 15-24). The MYCC can employ up to 450 young adults across Michigan during the first year. The MYCC is "shovel ready" and can begin implementation within 90 days of award notice. The four existing youth employment programs that will serve as regional hubs are currently located in Marquette, Traverse City, Kalamazoo and Detroit. Current MYCC partners and supporting agencies include but are not limited to; Superior Watershed Partnership, Sustainable Environmental and Engineering Design (SEEDS), Greening of Detroit and Michigan WORKS as well as numerous local, state and tribal partners. MYCC work crews will complete a variety of prioritized natural resource conservation projects on local government, state, federal and tribal Michigan Youth Conservation Corps: A State- public lands. In addition, some MYCC crews will be trained to provide basic home wide Employment Program for Michigan Youth energy conservation assistance for low income households and the elderly. The MYCC5/1/2009

d e tt

Expected Completion Date

Submitted Requests - Not Approved

447 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Superior Watershed Upper Peninsula of Partnership (NGO/501 Michigan, all cities, all c 3 non-profit) townships, 15 counties

Project Name

Project Description

Start Date

Developing a Michigan Model for New Wind Energy Projects: Creating New Jobs and Protecting Natural Resources

Energy and Natural Resources/Renewable Energy Research, Development, Demonstration and Deployment: Developing a Michigan Model for New Wind Energy Projects, Creating New Jobs and Protecting Natural Resources. This cooperative research and demonstration project will further the goals of the Michigan RPS by creating a replicable model for developing successful wind energy projects throughout Michigan. Emphasis will be placed on developing viable new projects in the hilly and forested terrain of northern Lower Michigan and the Upper Peninsula. Studies confirm that northern Michigan contains many of the best wind sites required for a viable community or commercial wind project. Participating or contributing partners include but are not limited to; Mackinaw Wind Power, Superior Watershed Partnership, The Nature Conservancy, Michigan Natural Features Inventory and Northern Michigan University (NMU). The project will develop a replicable boilerplate for low-impact wind power development in the northern forest ecosystem of Michigan and will include a student training and internship component with NMU. Specifically, this project will prov5/1/2009

Superior Youth Conservation Corps: A Summer Employment Program for Youth in the Upper Peninsula of Michigan

Education and Workforce/Youth Program and Energy and Natural Resources/Habitat Restoration and Home Weatherization: The Superior Youth Conservation Corps (SYCC) is an established summer employment program for young adults (ages 1524) that serves the Upper Peninsula of Michigan (15 counties) and accomplishes a wide variety of natural resource conservation projects on local, state, federal and triba lands. The SYCC also has an energy conservation program that provides home energy assessments for low income families and the elderly. The SYCC provides young adults with job skills training, environmental education and a strong work ethic while earning a paycheck. Stimulus funding would be used to expand the program to additional youth and young adults in the Upper Peninsula of Michigan including at-risk and tribal youth. The SYCC can employ up to 100 young adults across the Upper Peninsula of Michigan during the first year. The SYCC is "shovel ready" and can begin implementation within 90 days of award notice. Specific natural resource conservation projects include but are not limited to; Great Lakes pollution prevention, dune restorati 5/1/2009

T O

Superior Watershed Upper Peninsula of Partnership (NGO/501 Michigan, all cities, all c 3 non-profit) townships, 15 counties

d e tt

ub

t i m

Superior Watershed Upper Peninsula of Partnership (NGO/501 Michigan, all cities, all c 3 non-profit) townships, 15 counties

S

02262009

Great Lakes Protection and Restoration in Lake Superior, Lake Michigan, and Lake Huron Watersheds

Expected Completion Date

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

4/30/2011

$

225,000

4/30/2011

$

625,000

4/30/2011

$

750,000

N s

t s e

qu

e R

Energy and Natural Resources/Habitat Restoration: The Superior Watershed Partnership (SWP) has developed and implemented five state approved watershed management plans in watersheds of the Upper Peninsula of Michigan (Whetstone Brook and Orianna Creek, Chocolay River, Lower Dead River, Salmon Trout River (MDEQ and EPA approved), and Two Hearted River (MDEQ and EPA approved). The SWP maintains and inventory of “shovel ready” habitat restoration and water quality improvement projects that have been developed in cooperation with local, state, Federal and Tribal partners. Stimulus funding is requested to implement on-theground improvements at ten (10) priority sites in three Great Lakes watersheds (Superior, Michigan, and Huron) located in the Michigan’s Upper Peninsula. These “shovel ready” projects can be implemented within 90 days of award notice. Specifically, these projects would replace undersized and failing road/stream crossing structures that impact water quality (non-point source pollution - sedimentation) and aquatic habitat for priority Great Lakes fish species and other aquatic life. The propose5/1/2009

Submitted Requests - Not Approved

448 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Superior Watershed Upper Peninsula of Partnership (NGO/501 Michigan, all cities, all c 3 non-profit) townships, 15 counties

SustainErgy

Flint

SustainErgy

Flint

SustainErgy Suttons Bay Public Schools Suttons Bay Public Schools

Sylvan Township

Sylvan Township

Sylvan Township

Sylvan Township

Sylvan Township

Project Name

Retrofit/weatherize Flint homes

Train Energy/Hazardous Material Assessors, commerical and residential, and prepare unskilled labor for weatherization/retro-fitting, schools, homes, churches for long-term sustainability and reduced carbon impact.With Career Alliance, Mott Community College and Salem Housing as recruiting, assessment and training partners and University Michigan Interns as program evaluators. 5/9/2009

6/11/2009

$

1,267,500 x

SustainErgy/ Green Job Development

Identify, assess, prepare specs of properties, train local contractors (Mott Community College/Kettering) and handypersons in best practices for green retrofits and weatherization, establish tool bank for implementation, retrofit and/or weatherize 300 houses in 2009, 600 in 2010 in partnership with Salem Housing CDC. 5/9/2009

Suttons Bay, MI

WiFi Connectivity

Sylvan Township

02262009

d e t

State Police Outpost Driveway Installation

itt

Township Hall Repairs

m b u

S

D VE 2,100,000

Renewable Energy Demo Site

Sylvan Township

Funding Request

$

Suttons Bay, MI

Sylvan Township

P P A

O R

Route (Infrastructure Only)

4/30/2011

SustainErgy/ Green Entrepreneurs

Sylvan Township

Start Date

Energy and Natural Resources/Habitat Restoration: Environmental Knowledge Organizer (EKO) is an on-line, Geographic Information Systems (GIS) based data organizer and project management tool specifically designed to coordinate and integrate large quantities of natural resources related data. In one location, managers can access and track all related environmental project information (e.g. plans, permits, designs, photos, maps, charts, PDF and Word documents, Excel files), accessed through a GIS map interface. EKO will allow the Superior Watershed Partnership and regional partners (local, state, Federal, and Tribal) to accelerate implementation of projects and actions related to the Great Lakes Initiative by: 1) Providing Immediate Access to Information – All project-related data is available through a web-based public portal that enables Natural Resource Managers, PolicyEnvironmental Knowledge Organizer (EKO): makers, Funders, and the general public immediate access to a single repository of An Innovative Management System for Great information; and 2) Providing Transparency and Accountability – All projects are easily Lakes Protection and Restoration tracked and monitored through a highly intuitive map-based interface. Local and comm5/1/2009

Genesee County

Sylvan Township

Project Description

Expected Completion Date

Heim Road

T O

N s

st

6/11/2009

$

140,000 x

Educate, train a core group of green economy business owners through U of Michigan & Kettering Business Incubators. Initial group of 10-15 potential owners will receive certified training/support. 5/9/2009 Contruct wind and solar energy demonstration sites on campus for use by students as research projects 6/8/2009

6/11/2009

$

486,010 x

8/31/2010

$

1,000

Equip each classroom with multi-media and WiFi connections

8/31/2009

$

545,000

e u

q e R

6/8/2009

Install a driveway that wraps around the front of the Township Hall to the back. This would allow the Michigan State Police outpost currently in the Township Hall to expan its presence there, and achieve savings. Anytime

Within 2 years of start date

Repair the Township Hall, in which currently the Michigan State Police has an outpost, including conducting an energy efficiency audit and making energy efficiency upgrades. Pave Township Hall parking lot. Anytime

Within 2 years of start date

Work to include shaping the existing surface, the application of about 4" (CIP) of 23a ilmestone (about 550 tons) with associated sut control and project restoration. Estimated project cost: $7,700 (note - the Washtenaw County Road Commission has suggested this project be completed).

Kilmer Road

Work to include shaping the existing surface, the application of about 4" (CIP) of 23a limestone (about 2,450 tons) with associated dust control and project restoration. Estimated project cost: $34,100.

Hoppe Road to Notten Road

Bush Road

Work to include shaping the existing surface, the application of about 4" (CIP) of 23a limestone (about 3,750 tons) with associated dust control and project restoration. Estimated project cost: $52,100 (note - the Washtenaw County Road Commission has suggested this project be completed).

Blacktop to the Township line

Submitted Requests - Not Approved

449 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sylvan Township

Tecumseh District Library Texas Township Texas Township Texas Township

The Art Center

Sylvan Township

Tecumseh Texas Township Texas Township Texas Township

Mount Clemens

Project Name

Project Description

Expected Completion Date

Start Date

Winters Road

Work to include spot roadside berm removal, shaping the existing surface, the application of about 4" (CIP) of 23a limestone (about 2,450 tons) with associated dust control and project restoration. Estimated project cost: $34,100 (note - the Washtenaw County Road Commission has suggested this project be completed).

TDL Space Utilization/Renovation Colony Woods I Sanitary Sewer 10th St. Sanitary Sewer Texas Dr. Water Main

In an effort to make maximum use of our existing building we are renovating the interior to accommodate additional public access to the Internet through library computers and users of our WiFi. We are also opening up the space and enhancing the traffic flow to accommodate increase of usage by our community. Construct sanitary sewer to the residents of Colony Woods I subdivision South 10th St Sanitary Sewer Extension Install water main in Texas Drive

Mount Clemens Arts Incubator

With an emphasis on sustainable materials and Green building practices, refurbish an historic building within walking distance of downtown Mount Clemens, creating affordable studio and live/work space for artists and other creatives, including gallery space, workshops, and ancillary businesses. 7/1/2009

Electrical Infrastructure Upgrade at Henry Ford Museum

O R

Mid to late April, 2009 6/15/2009 5/15/2009 5/15/2009

D VE

Kalmbach to Musbach

$ $ $ $

300,000 600,000 655,200 300,000

$

3,000,000

To maintain its significant contribution to Michigan's economy, The Henry Ford must compete against other tourism destinations, like Chicago and Cleveland. To remain All competitive in the regional and national tourism markets, an industry that contributes design/engineerin significantly to Michigan's economy and provides hundreds of thousands of jobs, THF g for the project has been must develop new exhibitions and visitor amenities. Today's exhibitions and visitor completed. amenities require dramatically improved lighting, sound and technological interface Project is "shovel capabilities, none of which is possible without a comprehensive upgrade to the ready." museum's 80-year old electrical infrastructure, one now well beyond its reasonable and reliable life. The electrical upgrade will help THF create and retain jobs in its own Implementation can begin as soon workforce, with the electrical and other construction workers that will work on this as federal/state within 1 year of specific project, and within other segments of MI's tourism industry (e.g., hotels, funding receiving funding restaurants, cabs, airlines, etc.) which serve the 1.5+ million visitors THF draws to commitment is commitment from Michigan. The comprehensive electrical infrastructure upgrade to Henry Ford federal/state gov't. $ Museum is necessary to support visitor expectations and is critically important for prot received.

6,000,000

T O

P P A

11/1/2009 11/15/2009 11/15/2009 11/15/2009

Funding Request

4/1/2010

Route (Infrastructure Only)

N s

t s e

The Henry Ford

Dearborn, MI

R d

e t t

t i m

b u S The MIX (Michigan Information Exchange) Brighton

The MIX (Michigan Information Exchange)

The Torii Institute

Peaceful Warriors Studio

Dearborn Heights

02262009

u q e

Already obtained the building and A destination center that will highlight art, history, athletes, writers, resources, local restaurants, museums, foods and anything else you want to know about Michigan. Funds need to be raised to repurpose an old industrial building located on the hub of governmental approval. Have 96 and 23 in Brighton. This will bet a place that mixes all of Michigan artistic, intellectual and other methods of exchange in a unique environment. A place that will architect and a team who have show that combining commerce with meaning can be the norm instead of the looked into exception. As a result, without knowing, you will have done something good for alternative forms yourself by being there. Working studios and collaborative galleries would allow technical and/or historical aspects to enhance and encourage visits. There are ample of energy. Start opportunities with this exciting and innovative project to: · Encourage new business to implement growth by having a location to affordably showcase Michigan resources of all kinds. · infrastructure Provide jobs and people that will become rooted in our community. · Have a crucial changes as soon as funding is impact on our local and State economy, and as a model, trickle into our nations economy. · Be an important catalyst for learning, discovery and achievement. · Leveraavailable. Development of after school tutoring, recreation and martial arts training center for local youth. 3/1/2009

Submitted Requests - Not Approved

90 days to no more than 180 days after funding available. 8/1/2009

$

140,000

450 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

The Village of Athens

The Village of Atthens, Athens Township, Calhoun County

Project Name

Project Description

Start Date

Athens Water Improvements

The Village of Athens is proposing water system improvements to increase the reliability of water supply and quality to its low to moderate income residents. The system improvements involve watermain, the water tower, and the water treatment plant. There is currently no emergency power at the water treatment plant. Therefore, genorators are proposed at the plant and wells to ensure that in the case of power failure the Village's water supply can still properly function. The Village currently has old undersized watermain serving many customers. This undersized watermain is a water quality problem for the customers on these lines. Some of these lines have lead joints and unreliable fire hydrants. The village proposes to replace about 5,300 feet of old watermain with new to provide good water quality and reliable fire hydrants Finally, the Village desires to install controls at the water tower that would allow for the use of all the capacity of the tower. This would benifit the whole Village from a fire flow standpoint and would be more appealling to potential commercial users. The wat 6/1/2009

Green Fire Station

1,052,000

We have a need in the western part of our Township for a fire station. The residents and commercial properties in our entire western part of the Township must pay a higher insurance premium due to the fact their fire station is located more than five miles from their homes / business. If a fire station was built closure to their homes, the entire western part of our community would benefit from LOWER insurance rates. We already have some property where this could be constructed on but would need the federal dollars provided by this stimulus package to make this a reality and thereby allow some residents to enjoy a saving the rest of our community enjoys. This would clearly demonstrate the positive impact and commitment your desire by the stimulus package. This fire station would house a fire engine and rescue squad. It would provide a modern training facility for many fire fighters. This building would be constructed of the most modern technology known to create an ENERGY EFFICIENT GREEN BUILDING. The use of solar panels for its energy would be a must. Today’s fire stations must not only just be a fire station, but we must think green not red. We ne7/1/2009

8/1/2010

$

1,300,000

Solar Traffic Control Signs

Due to a limited number of police officers, and the need for speed enforcement within Thomas Township, it is proposed that 6 portable solar powered electronic speed signs be purchased and placed in strategic areas of our community. Maintaining a safe traffic speed is increasingly more difficult in Thomas Township due to Hemlock Semi Conductor (HSC) expansion which has created over 1000 full and part time jobs. Our goal is to keep both contractors and residents in the township safe by keeping traffic at posted speeds. This type of electronic speed sign will have many benefits: Solar powered speed signs will allow rapid electronic adjustment in problem areas with excessive speed. Safety for the public is paramount while shopping in our business district. Just a few of the major uses of electronic speed signs are: Traffic monitoring and management; providing traveler information; Incident management; Enhancing safety of both the road user and pedestrians; increasing capacity; enforcement; tracking and evaluation of travel habits 7/1/2009

12/1/2009

$

48,000

Thomas Township North Business District

This Project consists of constructing the remainder of Shields Drive and related appurtenances. This roadway extension will create both an alternative route to the congested State highway (M-46) and a new community business district. This proposed project will create a new district that will consist of mixed uses such as residential, office business and service business. This new district will promote Thomas Township’s long-term economic liveliness and encourage high quality development. In addition, it will encourage a walkabout and pedestrian friendly business district to keep residents safe and enhance their quality of life.

8/1/2010

$

863,337

t s e

Route (Infrastructure Only)

D VE $

s

Thomas Township

PP

O R

Funding Request

11/1/2009

A T

Thomas Township

Expected Completion Date

O N

u q e

R d

Thomas Township

i m

ub

Thomas Township

e t tt

S Thomas Township

Thomas Township

02262009

Submitted Requests - Not Approved

5/1/2009

451 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Project Name

Project Description

Start Date

Thomas Township Gratiot Road Business District Corridor

Corridor investments bring a number of tangible benefits to the citizens of a community. At the most basic level, we are encouraging the public to shop in our business district, so it must be attractive, safe and attainable. A clean and safe corridor is an indicator of civic pride and will help transform the rundown downtown area along Gratiot Road (M-46) into an attractive public amenity for all to enjoy. Secondly, these improvements lead to increases in the overall tax base by stimulating sales for existing businesses, helping to attract new investment to the improved area and ultimately by increasing property values. These benefits do not occur without the willingness of the private sector to respond to the public sector’s investment. For this reason, Thomas Township and the business community have teamed up to form a Downtown Development Authority (DDA). The Township and DDA’s plan is to help revitalize the business district and to stimulate growth and create jobs. 5/1/2009

Thomas Township

Thomas Township Trail

Thomas Township is proposing to construct a 4.8 mile eight (8’) foot trail along the Consumers Energy easement. Community and family are at the heart of the American trail experience. One of the most significant benefits of trails is the sense of community and the connections they build. Trails also build strong, economically vital communities. According to the National Association of Home Builders study cited in The New York Times, trails are the number one amenity potential homeowners cite when they are looking at moving into a new community. Trails provide communities with a valuable amenity that translates into increased housing values. Trails can also revitalize neighborhoods, as well as build local businesses. 5/1/2009

Thomas Township

Thomas Township operates and maintains 14 sewage pumping stations throughout the community’s service area. These facilities are manually checked routinely, and utilize a rudimentary alarm telemetry system for alarms only and do not monitor operations. By incorporating a standardized, modern and efficient alarm telemetry system, the monitoring of these facilities could be accomplished remotely by utilizing data links through cellular systems connecting to a computer interface at various locations. This would be an immense savings in the amount of man hours currently dedicated for monitoring and would significantly reduce vehicle usage thus reducing fuel costs. The proposed system will integrate solar technology for the powering of the individual units. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide an uninterrupted power supply source to the telemetry system would be incorporated, not only for energy efficiency, but to also showcase the viability of Thomas Township Alarm Telemetry Upgrade renewable energy sources for practical purposes in a utility’s operations and monitorin5/1/2009

Thomas Township

A T

Thomas Township

s

t s e

Expected Completion Date

PP

O R

O N

Funding Request

Route (Infrastructure Only)

D VE

8/1/2010

$

1,706,469

12/1/2009

$

2,006,050

8/1/2010

$

48,000

12/1/2009

$

52,230

u q e

Thomas Township

Thomas Township

e t tt

i m

b u S

Thomas Township

02262009

R d

Communication/IT Server Improvement

Thomas Township has three main buildings with in a "campus type area". These buildings all have their own outdated servers which provide software, communication (email), archives of documents, communications to County and elsewhere. Our plan is to link the buildings through the use of updated large capacity servers which would enhance the ability to archive sensitive documents while enhancing and strengthen th ability to communicate from one server, and have our own back up file system. 5/1/2009

Submitted Requests - Not Approved

452 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township

Project Name

Project Description

Start Date

75' Ladder Fire Truck (Quint)

Our current aerial apparatus is a 1977 Mack Tele-Squirt with an open back cab. This truck is old and has several maintenance issues which at times make this truck inoperable. The National Fire Protection Association (NFPA) has addressed old fire trucks like ours in a standard section entitled NFPA 1901 annex D. In this standard, it requires retrofitting any apparatus having an open style cab. The cost to complete this project is cost prohibitive and therefore prevents us from meeting this standard. We have spent several thousand dollars maintaining this truck in an attempt to keep it road worthy and because we have a serious need for it. We don’t have the funding to replace this truck. The occupancies in our community which require the use of this type of truck are several two story homes, a three story senior citizens complex, several two story apartment type complexes, several large commercial buildings and chemical plant with several structures some of which are four stories in height. There are no other aerial apparatus located in the western part of our county, thereby making this unit a needed commodity. The only way we could continue to protect our c5/1/2009

Thomas Township Department of Public Works Facility

Thomas Township Public Works currently utilizes numerous storage areas scattered over an approximately 36 square mile area for both equipment and materials. The main storage area is located 5 " miles from the main population center where most of the department’s duties are completed. Additionally, this storage area is in an unsafe and unsound condition and needs to be replaced. This proposed project would replace all storage areas scattered around the community to one centralized facility located within the population center. By centralizing operations and storage, this will reduce the amount of fuel considerably that is used to retrieve or return supplies to various areas, numerous times over the course of a workday. The project has been designed by a LEED certified Architect and incorporates modern energy efficient measures for both lighting and heating. The design is complete and ready to bid out for construction immediately, providing funding is in place for that construction. 5/1/2009

Thomas Township

Thomas Township

Thomas Township

700,000

1/1/2010

$

1,305,000

Thomas Township had the opportunity to purchase 29 acres from a local service club two years ago that allows us to expand one of our parks. The plans for this expansion has been split into three phases and we are requesting money to begin the first phase. Phase one includes three soccer fields, three sand volleyball courts, parking, eight foot walking trails, bathroom/storage facilities, and the picnic tables and landscaping necessary to make this a wonderful park for our residents. 5/1/2009

12/1/2009

$

1,352,000

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/1/2009

e t tt

i m

Thomas Township

b u S

Thomas Township

12/1/2009

$

243,000

02262009

s

t s e

Thomas Township Sewage Pumping Station #2 Replacement

Route (Infrastructure Only)

D VE $

O N

u q e

R d

Roberts Park Expansion

PP

O R

Funding Request

7/1/2010

A T

Thomas Township

Expected Completion Date

Submitted Requests - Not Approved

453 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township

Project Name

Project Description

Start Date

Thomas Township Sewage Pumping Station #3 Replacement

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/1/2009

Thomas Township Sewage Pumping Station #6 Replacement

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/1/2009

A T

Thomas Township

Thomas Township

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

12/1/2009

$

243,000

12/1/2009

$

243,000

12/1/2009

$

243,000

O N

u q e

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/1/2009

R d

Thomas Township

Thomas Township

i m

Thomas Township Sewage Pumping Station #8 Replacement

b u S 02262009

e t tt

Submitted Requests - Not Approved

454 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township

Project Name

Project Description

Start Date

Thomas Township Sewage Pumping Station #5 Replacement

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/1/2009

Thomas Township Sewage Pumping Station #7 Replacement

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/1/2009

A T

Thomas Township

Thomas Township

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

12/1/2009

$

258,000

12/1/2009

$

258,000

12/1/2009

$

763,315

6/1/2009

$

24,150

O N

u q e

Thomas Township

Thomas Township

Thomas Township

Thomas Township is proposing to install an electronic community sign on the corner of Gratiot and North Miller Roads. This is a highly visible corner not only for local residents but commuters traveling the Gratiot Road corridor. This electronic sign would be used primarily as a community sign announcing upcoming community events, but could also be used by the local businesses to advertise. In addition, this sign could display emergency disaster information through effective real-time messaging alerting the public to safety situations, broadcasting information on wanted Thomas Township Electronic Community Sign fugitives and Amber Alerts. 5/1/2009

b u S

Thomas Township

02262009

e t t

R d

Thomas Township Sidewalk Enhancement

t i m

Thomas Township is a very active community, and it is looking to expand the sidewalks. Sidewalks are a vital component of an active community. Sidewalks also enhance safety. Pedestrian safety must be paramount, especially for children walking to school. Increasing sidewalk networks in areas where people live, learn, work and play will keep more children and families safe. Neighborhoods with sidewalks may actually have higher housing values. An Urban Land Institute study showed homebuyers were willing to pay a $20,000 premium for homes in pedestrian-friendly communities. Sidewalks can also help reduce vehicle emissions that pollute our air. 6/1/2009

Submitted Requests - Not Approved

455 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township

Project Name

Project Description

Start Date

Two or More Full Time Police Officers

The Thomas Township Police Department services an area of 34.5 square miles, populated by more than 13,000 residents, has a major state highway that carries 50,000 plus daily traffic counts and is home to Hemlock Semi Conductor Corporation. Governor Jennifer Granholm calls HSC the gemstone and foundation for, “the new silicon valley.” She is courting other new business investments to this anchor zone to feed off HSC’s solar power division. HSC and the Dow Corning Corporation have committed to or already invested over 3 billion dollars in the HSC site. With this comes an additional 700 jobs and 1,100 construction jobs. The already overburdened police department is requesting funding under the Cops More Grant to add two full-time police officers to provide two-officer coverage on most shifts. The Council on State Governments, a policy study group of the Bureau of Justice Statistics of the U.S. Department of Justice, recently released findings that indicate Michigan is the most violent of the 14 Great Lakes States. They also noted that we have fewer police officers per capita than any of the other 13 States. The two most violent countie4/1/2009

Thomas Township Department of Public Works Facility

The Thomas Township water utility services 4639 customers in an operational area of approximately 36 square miles. Currently, all water meters are read for billing purposes manually. By utilizing modern technology, a considerable amount energy savings can be achieved by less vehicle usage in obtaining those readings. The proposed system would utilize remote battery based radio transmissions for the collection of water usage records throughout the Township. The solicited funds would purchase the necessary equipment to retrofit the Township’s existing system. By retrofitting the Township’s existing system instead of replacing it, the requested funds are being utilized prudently and wisely by avoiding undue waste of material and time. 5/1/2009

d e tt

Several years ago the Village of Three Oaks replaced a rather antiquated lighting system in the downtown area. The residential areas of the Village still have the old lighting system. The Village is a very small community and funds were limited. The lighting system for the downtown area encompases 24 lights and the residential area has several hundred. The lights in the village are in need of replacement with energy efficient, green lighting. The lights should be run on a global clock with the ability to dim the lights and adjust them as needed. Replacing the lighting could reduce energy consumption by as much as 50%, maintenance by 99% and save the Village nearly $10,000 per year. The Village is financially strapped and this project has been on the Village's list without the resources to begin the project. There is a company in Farmington Hills, MI that can begin the project immediately. See attached lighting piece. 2/9/2009 To enhance technology with wireless broadband connectivity, a modern computer lab, and classroom smart boards.

T O

Thomas Township

Thomas Township

Three Oaks Lighting Three Oaks Public School Academy Three Oaks Public School Academy

t i m

Village of Three Oaks

Three Oaks Lighting

Muskegon

Three Oaks Public School Academy

Muskegon

02262009

b u S

Three Oaks Public School Academy

q e R

To construct a new school (Grades K-8) by GREEN standards.

Submitted Requests - Not Approved

O R

P P A

N s

st

e u

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

Continuing

$

299,245

8/1/2010

$

670,500

10/9/2009

$

250,000

9/1/2009

$

100,000

$

6,000,000

456 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Three Oaks Public School Academy Three Rivers Community Schools Three Rivers Community Schools Three Rivers Community Schools Three Rivers Community Schools

Three Rivers Community Schools Three Rivers Community Schools Three Rivers Community Schools Three Rivers Community Schools Three Rivers Community Schools Three Rivers Community Schools

Three Rivers Community Schools Three Rivers Community Schools

Project Name

Start Date

Muskegon

Three Oaks Public School Academy

Three Rivers

Insulating Administration Building

Three Rivers

Thermo Pane window for Barrows

Creation of a self-sufficient, solar Greenhouse/Classroom as an addition to our school. Three Oaks Public School Academy is a Charter School in the heart of the inner city of Muskegon, Michigan. The majority of students live in households that earn less than $26,000 per year. To say that the students in this area are underserved is an understatement. They know little about becoming more self-sufficient, and even less about the need to begin to create a “greener” world. What the students understand about energy is that they lose it and often. The students at Three Oaks Public School Academy deserve the opportunity to learn in a “real life” scientific environment how to grow plants and vegetables with the newest techniques, and see and understand first hand how the sun and the wind can sustain the energy needed to heat and light the Greenhouse classroom. The outcome for these students and parents can be summed up with four words: collaboration, conservation, creation, and career. The students will have the opportunity to collaborate in experiential learning activities. The students will learn to live with what the word conservation means and begin to understand the affec Add insulation to district administrative building. Currently heating and cooling are Start When inefficient Approved Start When Replace window at Barrows Adult Education Building Approved

Three Rivers

Replace Middle School Chiller

Currently only one chiller is functioning leading to inefficient power usage. Replacing nonfunctioning chiller will allow system to operate at full efficiency

$

12,000

$

40,000

$

60,000

$

110,000

$

150,000

$

400,000

Add additional light to high school auditorim Replace chainlink fencing around Andrews Elementary, Hoppin Elementary, Middle School, and High School

$

20,000

$

75,000

Add additional parking for high school

$

150,000

Expand parking lot at bus garage could merge with High School project

$

180,000

$

200,000

$

265,000

T O

-N

Three Rivers

Conversion of Middle School Physical Education Classroom Heating system

Three Rivers

Renovation of Middle School Kitchen

Three Rivers

Auditorium Lighting

Three Rivers

Fencing

Three Rivers

High School Parking Lot Addition

Three Rivers

Parking Lot fpr Bus Garage

t i m

ub

Three Rivers

Fiber

Tittabawassee Township, Freeland Mi Hospital/Hoskiss/Hackett loop

02262009

9/1/2009 120 days after start date 120 days after start date

120 days after start date

Converting Three Rivers Middle School PE classroom from electric heating to hot water heat. This cost would remove existing equipment and replace it with necessary equipment to upgrade to the more energy efficient method of heating. New energy efficient appliances and equipment, upgrades to serving line and other produtivity improvements

e u

eq

R d

e t t

Wireless and Network upgrades

s t s

Start When Approved

Put in new network equipment to allow faster data speeds and that will upgrade capabilities in both the high school and middle school. Primarily replacing old hubs with switches. Putting in wireless access through out the middle school and high school Connect our four elementary schools, adult education school and bus garage to our high school with fiber optic cable The construction of a new terminal at MBS international airport and the extension of sanitary sewer and watermain to service that facility has left a dead-end watermain at the airport. This project would resolve that issue by extending the watermain north on Hospital road creating a loop for the northeast portion of the township. Additionally, we would extend water service north to Hoskiss Rd and complete the loop to Hackett and back to Hospital Rd. 8/15/2009

Submitted Requests - Not Approved

10/30/2009

Route (Infrastructure Only)

D VE 50,000

Replace eisting servers with Virtual Seervers Repalce 25 servers with 3 Virtual Servers,software and backup systems

Three Rivers

P P A

O R

Funding Request

$

Three Rivers

S Tittabawassee Township

Project Description

Expected Completion Date

$

Hospital/Hoskiss/H 1,200,000 ackett Rds

457 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

To continue the Townships efforts to create a true Looped system and better serve the portion of the community on the west bank of the Tittabawassee River a Sarle Rd crossing is essential. To accomplish such a crossing , an extension water main north on Old Midland Rd to Gleaner Rd N. & South to Wilkinson Rd with watermain constructed on Wilkinson to Gleaner, Orr to Freeland and Orr between Scott and Freeland, replacing Scott Rd main between Gleaner and Orr. Also a Gleaner Rd Loop – Mielke to Gleaner , Freeland to Gleaner with Tittabawassee Road Meter pit to Graham Rd also being added. 10/1/2009 This project consists of pavement rehabilitation, minor widening and grading, and new asphalt surface 6/30/2009

Tittabawassee Township Tittabawassee Township

Tittabawassee Township, Freeland Mi River Crossing and West Side Loop Tittabawassee Township, Freeland Mi Carter Rd rehab

Tittabawassee Township

This project would improve drainage in these existing streets by extending storm Tittabawassee Township, sewer branches east, from the main located in 7th Street. Grading and minor asphalt Freeland Mi Myers/Wheelock/Roeser/Church St Drainage repairs would also be necessary. 8/1/2009

Tittabawassee Township

Tittabawassee Township, Freeland Mi Scott Rd Drainage

This project establishes a reliable and appropriate drainage outlet for this existing residential area. The eastern section of Scott Road has experienced flooding problems and Scott road has deteriorated due to insufficient drainage. Therefore, work would include the construction of a county drain to the river and storm sewer in the Scott Road right-of-way. 7/1/2009

Tittabawassee Township, Freeland Mi Midland Rd Sidewalk

This project would supply a safe bike/walkway along M-47. This route through Freeland is a high traffic area with highway speed limits. This also sers as the most direct route between the Freeland elementary school and the Freeland Sports Zone and links many of the local businesses to the downtown area.

Tittabawassee Township

Tittabawassee Township, Freeland Mi Powley Dr Intersection

This project will consist of widening the Powley Drive leg of the intersection to accommodate a left turn lane for south M-47 turns and improve overall safety of the intersection. This intersection is a main conduit for traffic going to an elementary school. This work will include sub-grade rehabilitation, curb and gutter, sidewalk, pavement, traffic markings, drainage enclosure, and grading.

Tittabawassee Township

Tittabawassee Township, Freeland Mi Freeland Rd resurface

Tittabawassee Township

Tittabawassee Township, Freeland Mi Ralph Drain

Tittabawassee Township

i m

ub

O R 3/25/2010

D VE $

Sarle/Old Midland/Gleaner/Wi lkenson/Orr/Freela 3,500,000 nd Rds. 100,000 Carter Rd

9/1/2009

$

Myers/Wheelock/R oeser/Church St 120,000 Drainage

7/30/2009

$

300,000 Scott Rd

6/15/2009

9/30/2009

$

450,000 Scott/River Rd

5/15/2009

6/30/2009

$

Powley Dr 100,000 Intersection

The project will consist of removing the deteriorated asphalt surface, repairing curb and gutter, minor widening at intersections, road shoulders, sidewalks, drainage inlets and repave this section of downtown road with new asphalt. 5/1/2009

5/15/2009

$

180,000 Freeland Rd

Currently the Township discharges to the Ralph Drain. This drain is partially open allowing for public access and exposure to the wastewater plant effluent. As a public safety issue it would be preferred if the drain were totally enclosed. 5/15/2009

7/30/2009

$

Hercules Dr. to M200,000 47

Description: The headworks project consists of a Parshall Flume and a rotary perforated screen at our wastewater treatment facility. This project will give Tittabawassee Township the ability to accurately measure influent flows and remove much of the objectionable nonorganic material found in the wastewater stream. A more accurate flow measurement will allow for increased process control and a more energy efficient operation of the aeration blowers, resulting in energy savings and a higher quality effluent. 3/1/2009

6/30/2009

$

195,000 9560 Pierce Rd

s

t s e

O N

u q e

PP

R d

9/30/2009

Funding Request

Route (Infrastructure Only)

$

A T

e t tt

Expected Completion Date

Tittabawassee Township

Tittabawassee Township, Freeland Mi Plant Headworks

Tittabawassee Township Tittabawassee Township

Tittabawassee Township, Freeland Mi 3rd & 5th St. Tittabawassee Township, Freeland Mi SSD Extension #2

This portion of the community still has some old 6” water main that needs upgrading for capability and reliability of the water delivery system in this area. 3/15/2009 The Sanitary Sewer District needs to be expanded north on Garfield Rd to include that portion of the Township in the collections system. 4/30/2009

4/30/2009

$

200,000 3rd & 5th streets

5/30/2009

$

500,000 Garfield Rd

Tittabawassee Township, Freeland Mi Water Storage

A 0.5 MG water facility needs to be constructed to insure adequate flow and pressure for the Township customers in the northeast section of the Township this is particularly important for future growth and expansion of MBS International Airport and the surrounding area 1/1/2009

6/30/2009

$

Tittabawassee Township

S

02262009

Submitted Requests - Not Approved

Garfield/Freeland 7,834,000 Rd intersection

458 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tittabawassee Township

Tittabawassee Township

Project Name

Project Description

Start Date

Tittabawassee Township, Freeland Mi Scott/River Rd rehab

This highly traveled secondary roadway provides a significant transportation need for a large section of residential dwellings. This work will include pavement rehabilitation, including sub-grade repair, minor widening to improve traffic safety, additional drainage, intersection geometry correction, and new asphalt surface. 5/30/2009

Tittabawassee Township, Freeland Mi Replace Pump Stations #3 & 8

Description: Replacement of two aging pump stations. Tittabawassee Township has nine pump stations that deliver wastewater to the aerated lagoon system throughout the service area. Two of these stations have reached the end of their useful life and need to be replaced. 4/15/2009

Church Road Water Main Replacement

Project consists of the replacement of the existing water main between East River Road and West River Road with a 12" water main including hydrants, valves and appurtenances to provide for a more reliable fire protection system and support the 12" loop around the Island.

West River Road Water Main Replacement

Project consists of the replacement of the existing water main between Church Road and Grosse Ile Parkway with a 12" water main including hydrants, valves and appurtenances to provide for a more reliable fire protection system and complete the 12" loop around the Island. 5/9/2009

Township of Grosse Ile Township of Grosse Ile

East River Road Water Main Replacement

Project consists of the replacement of the existing water main between Ferry Road and Horsemill Road with a 12" water main including hydrants, valves and appurtenances to provide for a more reliable fire protection system and complete the 12" loop around the Island. 5/9/2009

Township of Grosse Ile Township of Grosse Ile

HVAC Replacement at the Waste Water Treatment Plant

Project consists of the replacement of the existing HVAC system at the Waste Water Treatment Plant to provide for more reliable heating, air conditioning and ventillation system in order to protect the existing controls and equipment from corrosion. 4/9/2009

Township of Grosse Ile Township of Grosse Ile

Township of Grosse Ile Township of Grosse Ile

Township of Grosse Ile Bloomingdale Public School District Forest Hills Public Schools Forest Hills Public Schools Forest Hills Public Schools Adams Township School District

Adams Township School District

Township of Grosse Ile

Sanitary Interceptor Rehabilitation

Bloomingdale

Bus Maintenance Garage

Ada Township

Forest Hills

Ada Township

Forest Hills

Ada Township

Forest Hills Adams Township Schools, South Range Elementary School

Adams Twp.

Adams Township Schools, Jeffers High School

b u S

Adams Twp.

02262009

tt i m

d e t

Expected Completion Date

T O

7/30/2009

O R

P P A 5/9/2009

N s

t s e

10/30/2009

Funding Request

D VE $

450,000 Scott/River Rd

$

Hercules Dr. /MBS 700,000 Airport

11/9/2009

$

1,405,000

11/9/2009

$

1,610,000

11/9/2009

$

1,650,000

11/9/2009

$

550,000

Project consists of lining the existing 42" interceptor to provide for the removal of excessive amounts of infiltration/inflow from the sanitary collection system thus reducing the possibility of sewage bypasses and reducing sewage treatment cost. Wash equipment for buses at bus maintenance garage. We will use liss soap, water and employee time.

4/9/2009

10/9/2009

$

840,000

3/1/2009

4/1/2009

$

70,000

Ada Vista Elementary - Building addition and renovation

4/1/2009

10/1/2009

$

3,087,279

Ada Elementary - Building addition and renovation

4/1/2009

10/1/2009

$

3,343,397

Central campus project - CHS and CMS building renovation and site work 1. Replace and repair the roof on the South Range Elementary School. 2. Install a security system at the South range Elementary School.

4/1/2009

6/1/2010

$

14,345,125

8/1/2009

10/1/2009

$

100,000

8/1/2009

10/1/2009

$

150,000

qu

e R

1. Replace and repair the roofs on the 2 wings of Jeffers High School. 2. Install a security system on all levels of Jeffers High School. 3. Update existing HVAC computer to provide for additional safety and signaling features.

Submitted Requests - Not Approved

Route (Infrastructure Only)

459 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools Addison Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Addison

Addison K-12 Consolidation - STAGE 1 (Elementary Only)

This project creates a new K-12 school for the Addison Community School District by renovating the existing Middle School and constructing two new additions. These two new additions replace the Elementary and the High School which will be demolished upon completion of the new construction. The possibility of constructing new facilities allows the school district a chance to provide the students with up dated educational spaces while reducing the burden of operating older, non-energy efficient structures. Designing the new elementary and high school addition would provide the chance to demonstrate to the community that green sustainable practices can be implemented, making the building environmentally friendly. This request is for Stage 1 only, which incorporates the elementary school with the middle school. 6/8/2009

Addison

Addison High School

Replace rusted breezeway entrance doors

Addison

Addison Middle School

Replace 2 sets of entry doors- south side

Addison

Addison High School

Re-insulate ductwork over locker rooms

Addison

Addison Wayne Gray

Replace boiler

Addison

Addison High School

Asbestos removal

Addison

Addison General Campus

Replace roof - Maint. Building

Addison

Addison Middle School

Add doors to open classrooms (10)

Addison

Addison High School

Replace 30 year old boilers

Addison

Addison High School

Addison

Addison Wayne Gray

Addison

Addison Middle School

Addison

Addison High School

Addison

Addison Upper Elementary

Addison

Addison High School

O R

Funding Request

D VE

12/8/2010

$

16,000,000

9/1/2009

$

5,000

6/8/2009

9/1/2009

$

6,000

6/8/2009

9/1/2009

$

15,000

6/8/2009

9/1/2009

$

15,000

6/8/2009

9/1/2009

$

20,000

6/8/2009

9/1/2009

$

40,000

6/8/2009

9/1/2009

$

50,000

6/8/2009

9/1/2009

$

50,000

Heat for hallways/Common areas (Currently no heat)

6/8/2009

9/1/2009

$

55,000

Roof repair/replacement

6/8/2009

9/1/2009

$

60,000

Roof repair/replacement

6/8/2009

9/1/2009

$

307,000

Roof repair/replacement,

6/8/2009

9/1/2009

$

480,000

Add exhaust fans to restrooms

6/8/2009

9/1/2009

$

1,000

Add vent hoods to Art room kilns

6/8/2009

9/1/2009

$

2,000

Addison Middle School

Replace heating system air compressor

6/8/2009

9/1/2009

$

3,000

Addison Wayne Gray

Replace bathroom partitions - boys bathroom West

6/8/2009

9/1/2009

$

3,500

Addison Middle School

Modify/Repaint lockers

6/8/2009

9/1/2009

$

5,000

Addison Wayne Gray

Upgrade fire alarm system

6/8/2009

9/1/2009

$

10,000

Addison Upper Elementary

Upgrade fire alarm system

6/8/2009

9/1/2009

$

10,000

Addison

Addison High School

Replace chemistry countertops/fixtures

6/8/2009

9/1/2009

$

12,000

Addison

Addison Upper Elementary

Replace boilers

6/8/2009

9/1/2009

$

45,000

m b u

Addison Addison Addison Addison Addison

02262009

S

A T

O N

R d

e t t

it

st

e u

eq

s

PP

6/8/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

460 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Addison Community Schools Addison Community Schools Addison Community Schools Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Addison

Addison General Campus

Concrete repair/replacement

6/8/2009

9/1/2009

$

60,000

Addison

Addison Upper Elementary

Roof repair/replacement

6/8/2009

9/1/2009

$

108,000

Addison

Addison General Campus

New asphalt on west end of campus

6/8/2009

9/1/2009

$

200,000

Adrian

Adrian Public Schools - Varsity baseball

Install site drainage

5/1/2009

11/1/2010

$

35,000

Adrian

Adrian Public Schools-Highschool

Window treatments

5/1/2009

$

43,000

Adrian

Adrian Public Schools - 5/6 Middle School

11/9/2009

$

78,000

11/9/2009

$

87,000

Adrian

Remodel locker rooms inclusive of HVAC, flooring, Showers, ceiling and lighting Classroom renovations in old locker room area which is currently being used for Adrian Public Schools - Michener Elementary storage Replace exterior windows/ curtain wall system with energy efficient, tempered Adrian Public Schools-7/8 Middles School windows with thermal, EE glass

5/1/2009

12/1/2010

$

97,000

Adrian

Adrian Public Schools - Soccer

Install new bleachers, improve egress, install handicap restrooms

5/1/2009

11/9/2009

$

118,000

Adrian

Adrian Public Schools - Tennis

Resurface Tennis Courts

5/1/2009

11/9/2009

$

125,000

Adrian

Adrian Public Schools - Track

Resurface tracks

5/1/2009

11/9/2009

$

150,000

Adrian

Adrian Public Schools - 5/6 Middle School

HVAC Control upgrades

5/1/2009

12/1/2010

$

217,000

Adrian

Adrian Public Schools-Highschool

HVAC and filtration equipment replacement for swimming pool

5/1/2009

12/1/2010

$

270,000

Adrian

Adrian Public Schools-7/8 Middles School

5/1/2009

10/1/2010

$

272,000

Adrian

Adrian Public Schools-Highschool

Remodel Science Rooms - Chemical Miscellaneous mechanical upgrades inclusive of asbestos removal, insulation, exhaust fans, dehumidification and ventilation

5/1/2009

12/1/2010

$

315,000

Adrian

Adrian Public Schools - 5/6 Middle School

Replace Swimming Pool HVAC/Filtration system inclusive of ceiling and windows

5/1/2009

12/1/2010

$

331,000

Adrian

Adrian Public Schools-Highschool

Improve site drainage / stormwater runoff

5/1/2009

11/9/2009

$

507,000

Adrian

Adrian Public Schools-Highschool

Replace asphalt parking lots with new base, asphalt curb, gutter and security lighting 5/1/2009

11/9/2009

$

851,000

Adrian

Adrian Public Schools - Tennis

Architetural Fees @ 5.5%

5/1/2009

11/9/2009

$

3,441,697

Adrian

Adrian Public Schools - Tennis

Construction Management Fees @ 7%

5/1/2009

11/9/2009

$

4,380,341

11/9/2009

$

5,279,875

Lenawee ISD

Contingency + General Conditions @ 7.5% 5/1/2009 LISD TECH Center: Combine/renovate Welding and Machine Trades classrooms into new Advanced Manufacturing Lab (approx. 6,500 sq. ft.) 6/1/2009

9/1/2009

$

1,205,400

Lenawee ISD

LISD TECH Center East Building: Renovate two classrooms (approx. $3,000 sq. ft).

When/if funds are Within two years of available start date $

369,000

Lenawee ISD

LISD Ag Learning Center: Install public sewer system for campus

When/if funds are Within two years of available start date $

276,750

Adrian

m b u

Adrian

Adrian Public Schools - Tennis

Lenawee ISD

Adrian

Lenawee ISD

Adrian

Lenawee ISD

Adrian Township

02262009

S

O N

Submitted Requests - Not Approved

PP

5/1/2009

A T

R d

e t t

it

st

e u

eq

s

5/1/2009

O R 11/9/2009

D VE

Route (Infrastructure Only)

461 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

LISD Ag Learning Center: Construct three classrooms plus conference space and offices to serve as Lenawee County's home for green (sustainable) buiding and site design education. It will also be the instructional home to LISD's agriscience technology and ornamental horticulture programs, where students are responsible for developing raw product growth models and implementing the process which allows raw products to be utilized by the biochemical program in the creation of ethanol and biodiesel fuels. The site will also provide occasional lab space for the Careers in Biochemical Technologies program, which provides student instruction in alternative When/if funds are Within two years of energy development and usage. available start date $

Lenawee ISD

Adrian Township

Lenawee ISD

Chesaning Union Schools

Albee Twp

Remodel/Update of Albee Elementary: replace roof, replace/update HVAC, remove Chesaning Union Schools - Albee Elementary asbestos, add art room, replace windows with safety glass, update technology

P P A

O R

6/10/2009

D VE

2,078,700

9/1/2010

$

2,309,000

9/1/2010

$

30,000,000

7/1/2009

6/1/2010

$

6,500,000

4/1/2009

5/1/2009

$

35,000

6/15/2009

9/1/2009

$

50,000

Albion Public Schools Albion

Albion Public Schools

Construction of a new gym and pool. Construction and renovation to add 10 new classroom to the High School. Complete renovation of the HVAC system at the High School, Crowell Elementary, Caldwell Elementary and Crowell/Administration Building to make them energy effiecent to meet the Green Building standards. Upgrade the technology system to meet the 21st century needs of the students. 8/10/2009

Allegan Public Schools Allen Park Public Schools Allen Park Public Schools Allen Park Public Schools Allen Park Public Schools Allen Park Public Schools

Allegan

Allegan - New Facility

Construct a Community Wellness Center

Allen Park

Allen Park - Allen Park High School

Repair and improvements to degraded exterior HVAC ductwork located on roof

Allen Park

Allen Park - Bennie Elementary

Installation of drop ceilings in cafeteria

Allen Park

Allen Park - Lindemann Elementary

Installation of drop ceilings in cafeteria

6/15/2009

9/1/2009

$

50,000

Allen Park

Allen Park - Distrist wide

Climate Control System upgrade to improve energy effeciency

3/1/2009

1/1/2010

$

290,000

Allen Park

Allen Park - Allen Park High School

6/15/2009

s t s

T O

-N

e u

q e R

9/1/2009

$

20,000

Windows are uninsulated and in some areas the glazing is failing. The windows should be replaced with energy efficient units. School was built in 1970 . This improvement would save on energy costs. 7/1/2009

8/1/2009

$

740,000

Unit ventalator upgrades and replace deteriorating hot water piping in tunnels.

7/1/2009

8/1/2010

$

1,025,000

7/1/2009

8/1/2010

$

480,000

7/1/2009 7/1/2009

8/1/2009 8/1/2009

$ $

215,000 330,000

Alma High School

Controls in the High School are a mix of pneumatic with some digital control components and systems. In general, zone heating is controled through the Metasys by Pod or wing rather than by room. Renovation should include replacement of mechanical systems pneumatic controls with electric components that communicate with the existing Metasys system.Many of the existing pneumatic thermostats and control valves are old and in need of replacement. Update emergency lighting to code and replace fire alarm system not meeting current requirements. Replace original lay-in acoustical ceiling tiles in corridors and classrooms Power Distribution: Upgrade electrical panels and classroom receptacles to accomadate technology

7/1/2009

8/1/2010

$

410,000

Almont

Almont

Site improvement -Parking Lot with site draining improvement

May O9

July O9

$

250,000

Almont

Almont

Roofing Project with additional insulation

May O9

July O9

$

500,000

Almont

Almont

Roofing Project with additional insulation

May O9

July O9

$

1,335,000

Alma Public Schools

Alma

Alma High School

Alma Public Schools

Alma

Alma High School

Alma Public Schools

Alma

Alma Public Schools Alma Public Schools

Alma Alma

Alma Public Schools Almont Community Schools Almont Community Schools Almont Community Schools

Alma

02262009

tt i m

ub

Alma High School

S

Alma High School Alma High School

d e t

Replacement and retrofit of gym lights

Submitted Requests - Not Approved

Route (Infrastructure Only)

462 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Alpena Public Schools Alpena

APS- Alpena High School

Alpena Public Schools Alpena

APS - Alpena High School APS - Thunder Bay Junior High School/Alpena High School Technology integration in the classroom.

Alpena Public Schools Alpena

Start Date

6/30/2009

$

25,000

8/15/2009

$

175,000

2/2/2009

8/15/2009

$

667,000

8/31/2010

$

950,000

$

175,000

8/31/2009

$

475,000

8/31/2009

$

540,000

8/31/2009

$

40,000

8/31/2009

$

60,000

8/31/2009

$

200,000

8/31/2009

$

200,000

8/15/2009

$

65,000

8/31/2009

$

285,000

6/15/2009

8/15/2009

$

1,202,800

5/15/2009

8/15/2009

$

900,000

6/15/2009

8/31/2009

$

30,000

Alpena Public Schools Alpena

APS - Ella White Elementary

Alpena Public Schools Alpena

APS - ACES Academy

Replace boiler snd upgrade unit ventilators.

Alpena Public Schools Alpena

APS - District-wide

Upgrade lighting by replacing and relamping fixtures and adding dimmer switches.

P P A 6/15/2009

Alpena Public Schools Alpena

Alpena Public Schools Alpena

APS - District-wide

Alpena Public Schools Alpena

APS - District-wide

T O

Alpena Public Schools Alpena Alpena Public Schools Alpena Alpena Public Schools Alpena

s t s

-N

e u

Replace floor covering (carpet and tile) in four buildings (Alepna High School, Thunde bay Junior High School, Besser Elementary, and Sunset Elementary 6/15/2009

q e R

O R

6/15/2009

Replace Roofs at four buildings where they at or past their warranty periods and beginning to leak. (Besser Elementary, Wilson Elementary, ACES Academy, and APS - District-wide Central Office 6/15/2009 Replace the Energy Management Controls - Allows HVAC personnel to monitor and APS - ACES Academy control temperature settings via computer. 6/15/2009 Replace the Energy Management Controls - Allows HVAC personnel to monitor and APS - Sunset Elementary control temperature settings via computer. 6/15/2009 Replace the Energy Management Controls - Allows HVAC personnel to monitor and APS - Besser Elementary control temperature settings via computer. 6/15/2009 Replace the Energy Management Controls - Allows HVAC personnel to monitor and APS - Ella White Elementary control temperature settings via computer. 6/15/2009 APS - Thunder Bay Junior High School/Alpena Install complete security camera system to the Junior High School and add additiona High School security cameras to the High School. 5/1/2009

Alpena Public Schools Alpena

Funding Request

Replace Physical Education Gymnasium Lighting with more energy efficient fixtures. 4/1/2009 Upgrade Energy Management Systems - 3 remaining wings of Alpena High School. Other wings have been completed in stages as dollars permit. 4/1/2009

Replace Boiler and retrofit steam to hot water (Unit Ventilators and mechanical plumbing . A vertical geo-thermal system is being considered for this land-locked city location. 4/1/2009

Alpena Public Schools Alpena

Expected Completion Date

Pave School Parking Lots

8/31/2009

D VE

Replace ______ sq feet of badly deteriorated asphalt on pitched roof with an adhered state-of-the-art rubber membrane roof designed to eliminate leaking and mimic the appearance of steel Replace the Energy Management Controls - Allows HVAC personnel to monitor and control temperature settings via computer. Replace the Energy Management Controls - Allows HVAC personnel to monitor and control temperature settings via computer. Develop access road to 12 future sites for CTE Building Trades Program on existing lots. Plans have already been developed.

6/15/2009

8/31/2009

$

60,000

5/1/2009

8/31/2009

$

150,000

Lowell-Alto Elementary

Create a 50 car parking lot.

6/8/2009

8/21/2009

$

250,000

Lowell-Alto Elementary

Replace exterior windows, replace front sidewalks, Replace roof, replace interior doors, install new mechanical controls, replace primary hot water mixing valve, upgrade emergincy lighting and fire alarm, and add electric for ceiling mounted projectors.

6/8/2009

8/21/2009

$

769,621

Mattawan

Construct or expand facilities

10/1/2009

4/30/2009

$

500,000

Armada Middle School

Replace 11 exterior doors

6/8/2009

8/31/2009

$

33,000

Armada Area Schools Armada

Armada Middle School

Replace water softener and gas piping

6/8/2009

8/31/2009

$

50,000

Armada Area Schools Armada

Armada High School

Replace 23 exterior doors

6/8/2009

8/31/2009

$

69,000

Alpena Public Schools Alpena Township

APS - Thunder Bay Junior High School

Alpena Public Schools Alpena Township

APS - Central Office

Alpena Public Schools Alpena Township

APS - Hinks Elementary

Alpena Public Schools Alpena Township

APS - CTE Program -Alpena High School

Lowell Area Schools

Lowell Area Schools Mattawan Consolidated School

Alto

S

Antwerp Twp

Armada Area Schools Armada

02262009

it

m b u

Alto

d e tt

Submitted Requests - Not Approved

Route (Infrastructure Only)

463 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Armada Area Schools Armada

Armada Middle School

Install a new science lab

6/8/2009

8/31/2009

$

100,000

Armada Area Schools Armada

District

Install elevator in two-story building

6/1/2009

8/31/2009

$

115,000

Armada Area Schools Armada

Armada High School

Renovate cafeteria

6/8/2009

8/31/2009

$

155,000

Armada Area Schools Armada

Armada High School

Renovate exterior football stadium bleachers with ADA accesibility (1976)

6/1/2009

6/30/2009

$

180,000

Armada Area Schools Armada

Armada High School

Replace high school parking lot (1976)

6/8/2009

$

400,000

Armada Area Schools Armada

District

Visual Presentors w/ infrastructure for all classrooms

6/8/2009

8/31/2009

$

480,000

Ash Township

Airport Community Schools

Funds will be used to abate and replace hazardous broken and loose asbestos tiles with recycled content VCT (10% to 20% recycled content) throughout several student occupied classrooms and hallways. Cost is estimated at $590,000 or $5.00 per square foot for abatement, installation labor and material cost for approximately 118,000 square feet throughout six school buildings. 7/15/2009

9/15/2009

$

590,000

Ashley

Ashley Community Schools

Replace lighting fixtures with energy efficient fixtures in elementary wing.

6/15/2009

8/31/2009

$

3,500

Ashley

Ashley Community Schools

Replace defective exterior doors to enhance energy consumption.

6/15/2009

8/13/2009

$

5,000

Ashley

Ashley Community Schools

6/15/2009

8/31/2009

$

6,000

Ashley

Ashley Community Schools

Relocate electrical fixtures in gymnasium which are a safety hazard. Install a vestibule set of fire doors as an air lock for energy conservation and also to add a level of security at the main entrance.

6/15/2009

8/31/2009

$

12,000

Ashley

Ashley Community Schools

Replace lighting fixtures with energy efficient fixtures in gymnasium.

6/15/2009

8/31/2009

$

20,000

Ashley

Ashley Community Schools

Replace old technology with energy efficient technology.

6/15/2009

8/31/2009

$

35,000

Ashley

Ashley Community Schools

Construct greenhouse to enhance science curriculum.

6/15/2009

8/31/2009

$

60,000

Ashley

Ashley Community Schools

6/15/2009

8/31/2009

$

14,000

Ashley

Ashley Community Schools

8/31/2009

$

18,000

Ashley

Ashley Community Schools

9/1/2009

$

30,000

Ashley

Ashley Community Schools Construct additional classroom for Alternative education. Bay City Public Schools, Western High/Middle School Replacement/repair of approximately 100,000 square feet of existing roofing

8/1/2009

12/31/2009

$

85,000

6/1/2009

1/1/2010

$

400,000

7/1/2009

6/1/2010

$

5,000,000

7/1/2009

7/1/2010

$

750,000

Airport Community School District Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Ashley Community Schools Bay City School District Bay City School District Bay City School District Avondale School District Avondale School District Avondale School District

ub

s t s

-N

e u

eq

R d

e t tt

i m

Auburn

T O

P P A

O R

Paint gymnasium to repair peeling paint.

Replace original tile flooring in K-4 elementary wing of our facility. Tiles are worn and cracked throughout the hallway and have shrunk in size over time. 6/15/2009 Renovate elementary restroom facilities with water conservation fixtures and replace broken ceramic tile. 6/15/2009

8/31/2009

D VE

Bay City Public Schools, Western High/Middle School Bay City Public Schools, Auburn Elementary School

Construction of new gym and cafeteria dedicated for middle school use, (2) court gym, seating for 1000 in the gym and cafeteria area that will service 500 students Addition of (4) student classrooms and related construction for Auburn Elementary Schools

Auburn Hills

Avondale/Districtwide

Roof replacement and repair

6/1/2009

8/9/2009

$

520,000

Auburn Hills

Avondale/Districtwide

Energy management upgrades

6/9/2009

8/9/2009

$

155,169

Auburn Hills

Avondale/High Sch.

Upgrade lighting to T-8

6/9/2009

8/9/2009

$

156,214

Auburn Auburn

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

464 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools

Location City or Township

Project Name

Project Description

Funding Request

Auburn Hills

Avondale/Districtwide

Master clock replacement

6/9/2009

8/9/2009

$

238,019

Auburn Hills

Avondale/High Sch.

PA replacement-safety issue

6/9/2009

8/9/2009

$

330,189

Auburn Hills

Avondale/High Sch.

RTU w/heat recovery replacement

6/9/2009

8/9/2009

$

572,646

Auburn Hills

Avondale/High Sch.

Boiler replacement w/controls

6/9/2009

8/9/2009

$

913,410

Auburn Hills Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township

Avondale/High Sch.

Door/Window replacement/repair

6/9/2009

$

250,158

Yale Public Schools/Avoca

Install 30 room motion sensors to control lighting

6/9/2009

$

3,000

Yale Public Schools/Avoca Elementary

Asbestos removal

6/9/2009

8/1/2009

$

5,000

Yale Public Schools/Avoca Elementary

Automatic flush urinals & stools

PP

8/2/2010

6/9/2009

8/25/2010

$

6,000

Yale Public Schools/Avoca Elementary

Water restrictive water softeners

6/10/2009

8/13/2010

$

7,000

Yale Public Schools/Avoca Elementary

Energy efficient water heaters

6/15/2009

8/18/2010

$

10,000

Yale Public Schools/Avoca Elementary

Automatic faucets

6/9/2009

8/30/2010

$

16,800

Yale Public Schools/Avoca Elementary

Automatic hand dryers

6/9/2009

8/3/2010

$

24,000

Yale Public Schools/Avoca Elementary

New roofing & insulation

6/9/2009

8/1/2009

$

50,700

Yale Public Schools/Avoca Elementary

Skylights

6/9/2009

8/15/2010

$

200,000

Yale Public Schools/Avoca Elementary

Windows

6/9/2009

8/20/2010

$

210,000

Yale Public Schools/Avoca Elementary

HVAC - Geothermal

6/9/2009

8/9/2010

$

1,500,000

R d

6/9/2009

8/1/2009

$

25,000

Yale Public Schools/Avoca Elementary

Reconstruct bus lane and front parking area

5/9/2009

8/1/2009

$

108,000

Yale Public Schools/Avoca Elementary

New computers, server, mobile lab, video projectors

6/9/2009

8/1/2009

$

210,900

$

11,965,000

$

600,000

e t t

Bangor Public Schools (Van Buren)

partially remodeling, furnishing and refurnishing, equipping and re-equipping the Bangor Primary Building and the Middle/High School; constructing additional lecture space for the existing science labs at the High School; acquiring, installing and equipping instructional technology for school facilities; constructing, equipping, developing and improving athletic/physical education facilities and play fields and improving a playground; and developing and improving sites.

Calhoun ISD Career Center HVAC Units

The Career Center of the Calhoun ISD rooftop HVAC units (8) are in need of replacement. They are 40 years old. Maintenance needs have increased annually and the efficiency of the units need improvement. We would replace with indivdual units in the lab areas allowing us greater efficiency in heating and cooling the building while give us better distribution of air flow. 5/31/2009

S Battle Creek

02262009

O N

Repave parking lot area

m b u

Bangor Public Schools (Van Buren) Bangor

s

st

e u

eq

A T

O R 8/9/2009

D VE

Yale Public Schools/Avoca Elementary

it

Calhoun ISD

Start Date

Expected Completion Date

Submitted Requests - Not Approved

8/31/2009

Route (Infrastructure Only)

465 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Battle Creek Public Schools

Battle Creek

Project Name

Project Description

School District of the City of Battle Creek Fremont Elementary School

Start Date

Expected Completion Date

New replacement elementary school for (K-8 Schoolwide Title I designation) Fremont School / existing school is over 80 years old and has outlived its useful life / school is the most highly sought after "school of choice" / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification / requires additional land purchase which will delay bidding 8/1/2009

D VE $

20,500,000

Lakeview Sch. District (Calhoun) Battle Creek

Remove approximately 30 ft. of asbestos pipe insulation located above the ceiling at Lakeview School District - Lakeview Middle Lakeview Middle School. Replace approximately 18,000 sq. ft. of vinyl asbestos tile School, Minges Brook, Prarieview, Riverside, with carpet at each elementary building (Minges Brook, Prarieview, Riverside, and 6/8/2009 - earliest 90 days after & Westlake Elementaries Westlake). Replace asbestos pipe insulation at Prarieview. work can begin commencement

$

216,000

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Minges Brook, Riverside and Westlake Elementaries & Territorial School

Upgrade Electrical Systems including the replacement of distribution and lighting panels.

$

216,000

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Territorial School

Mechanical/plumbing renovation - converting steam to hot water and adding air conditioning

$

412,000

Lakeview School District - New Riverside Elementary School

PLEASE NOTE: THIS IS HALF OF THE LAKEVIEW SCHOOL DISTRICT'S AUGUST 2008 UNSUCCESSFUL BOND PROPOSAL. SINCE THE ENTIRE PROPOSAL CAN NOT BE COMPLETED IN A TWO YEAR PERIOD IT IS OUR PREFERENCE THAT THIS PROJECT BE GIVEN CONSIDERATION IN PLACE OF OUR AUGUST 2008 BALLOT LANGUAGE. ADDITIONALLY, IF THIS PROJECT WAS SELECTED FOR FUNDING, OTHER PROJECTS ON OUR LIST WOULD NEED TO BE MODIFIED AS SOME OF THE WORK WOULD NO LONGER BE APPLICABLE. Construction of a new 119,500 square foot elementary school with a two-story academic wing to be constructed on the existing Riverside Elementary School site. This site would house and operate as two schools-within a school and Site Package supports the Educational Vision of the district at the elementary level. This project could be ready includes a partnership with Woodlawn Pre-school, whereby space in the new facility within 6 months of would be leased to the organization for the operation of their program. The existing notification of Riverside Elementary School and Minges Brook Elementary School would be funding with the discontinued for use as elementary schools. The New Riverside Elementary would beBuilding Package 24 months after commencement designed to achieve USGBC LEED Silver Certification. Elements of this certification into follow

$

26,780,000

Lakeview Sch. District (Calhoun)

Erecting, furnishing and equipping two new elementary schools, acquiring and installing educational technology improvements and developing and improving sites and playgrounds.

$

55,460,000

t s e

Lakeview Sch. District (Calhoun) Battle Creek Lakeview Sch. District (Calhoun) Battle Creek

Calhoun ISD

Calhoun ISD

Calhoun ISD

O R

PP

6/8/2009 - earliest 180 days after work can begin commencement

A T

s

9/1/2010

Funding Request

6/8/2009 - earliest work can begin 120 days

O N

u q e

R d

e t tt

Calhoun ISD Career Center Technology Generator

The Career Center of the Calhoun ISD does not have sufficient backup to its servers, access to internet, and access to the fiber backbone. This project will allow continuos communication availability which will also allow us to continuous access of out surveilance cameras for safety of the students. Other educantion entities are also connected to the fiber backbone beyond our connection so this would allow them continuous communciation. 3/31/2009

4/30/2009

$

65,000

Battle Creek

Calhoun ISD Career Center Fire Alarm Upgrade

The Career Center of the Calhoun ISD has a fire alrm that is not up to code and will need to be updated if any construction is completed in the building. This project will update all the panels and the fire alarm system to code and provide the students with a system that meets current standards. 5/31/2009

8/30/2009

$

125,000

Battle Creek

The Career Center of the Calhoun ISD currently does not have handicap accessibility to its main student entrance. This project would reconstruct the entrance by removing stairs and allowing for accessibility to the hadicapped. It will also allow the Center to Calhoun ISD Career Center Student Entrance make this the single access point into the building adding to the safety and security of Accessibility the students. 5/15/2009

7/31/2009

$

300,000

i m

b u S

Battle Creek

02262009

Route (Infrastructure Only)

Submitted Requests - Not Approved

466 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Calhoun ISD Career Center Lab Painting

The Career Center of the Calhoun ISD has labs (4) in need of repainting the walls, ceilings, and floors. This project will allow for the completion of removing the large equipment from the areas, painting and returning the equipment to the areas.

6/10/2009

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Minges Brook, Riverside, and Westlake Elementaries & PV

Replace fire alarm systems at four elementaries. Panels are original construction, 1950's vintage.

6/8/2009 - earliest 90 days after work can begin commencement

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Lakeview Middle School

Remodel and reconfigure physical education locker rooms to address ADA compliance, life cycle, and gender equity issues.

6/8/2009 - earliest 90 days after work can begin commencement

Battle Creek

Pennfield

Remodeling an old shop room into two classrooms appropriate for grades 5-8. Would include demolition of existing dust removal systems, paint room and other storage areas. New heating and ventilation system would be installed. All other interior needs would be addressed to make the space usable as a classroom. Techonology infrastructure would be installed as well. 5/1/2009

Battle Creek

Pennfield

Complete replacement of old bleachers and press box at football field.

Calhoun ISD

Pennfield School District Pennfield School District

Pennfield School District Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bay City School District Bay City School District Bay City School District Bay City School District Bay City School District Bay City School District Bay City School District Bangor Township Schools

Battle Creek

T O

8/31/2009

6/22/2009

$

202,000

$

206,000

$

1,030,000

8/30/2009

$

126,000

8/1/2009

$

750,000

8/30/2009

$

131,000

8/30/2009

$

98,000

O R

P P A

Funding Request

D VE

Battle Creek

Pennfield

Bay City

Bangor Township Schools/ John Glenn High

Remodeling of rooms in an elementary building to gain additional class rooms. Would include new windows and doors, demolition of some walls and replacement in new positions to equalize rooms size to largest possible. Install two new wall unit ventilators/heaters with appropriate piping and electrical instalation. New paint and floor coverings throughout all areas under remodeling. 6/22/2009 JGHS Bathroom Updates would reduce water usage and electrical by updating fixtures 4/1/2009

Bay City

Bangor Township Schools/ Edison Adm

Edison Roof Replacement would add additional insulation to the facility

5/1/2009

5/30/2009

$

150,000

Bay City

Bangor Twp School/ Lincoln Elem

Lincoln Bathroom Renovations to update and replace the lighting and fixtures in the restrooms to reduce electrical and water usuage of the facilities

6/8/2009

8/30/2009

$

60,000

Bay City

Bangor Township Schools/ John Glenn High

JGHS classroom ceiling and light replacement

6/8/2009

8/30/2009

$

100,000

Bay City

Construction of new student bus pick up and bus drop off area for Handy Middle School, would eliminate the use of a public road that is currently being used for this Bay City Public Schools, Handy Middle School purpose. Eliminate a potential safety problem

6/1/2009

1/1/2010

$

150,000

Bay City

Bay City Public Schools, Central High School Renovation/repair of the existing 400 space, south parking lot at Central High School 6/1/2009

1/1/2010

$

300,000

Bay City

Repair and improvements of the existing parking facility used by the District's bus fleet. Includes, excavation, paving and drainage improvements to the parking area for 80 buses 6/1/2009

1/1/2010

$

500,000

1/1/2010

$

200,000

7/1/2010

$

750,000

6/1/2010

$

1,000,000

12/31/2010

$

3,500,000

6/30/2009

$

60,000

tt i m

Bay City Public School, Transportation Department

ub

Bay City Bay City

Bay City

Bay City Bay City

02262009

d e t

st

e u

q e R

N s

S

Bay City Public School, Maintenance Bldg, Western High School, Central High School Construction of (3) new storage facilities at three different locations within the district 7/1/2009 Bay City Public Schools, Hampton Elementary Addition of (4) student classrooms and related construction for Hampton Elementary School Schools 7/1/2009 Renovation to the current administation building include architectural renovations and modifications as well as replacement/repair of the HVAC, plumbing, life safety and Bay City Public School, Administration Buildingelectrical systems 7/1/2009

Complete the renovation in the remaining portions of Central High School that were not covered under the District's 2005 bond project. This would include, cafeteria, 7/1/2009 Bay City Public Schools, Central High School kitchen, locker rooms, auditorium, etc JGHS Storage Building to enhance student and staff safety by permitting items to be Bangor Township Schools/ John Glenn High stored out of the high school 4/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

467 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools Bangor Township Schools

Beal City Public Schools

Location City or Township

Project Name

Bay City

Bangor Twp School/ Lincoln Elem

Bay City

Bangor Township Schools/ West Elem

Bay City Bay City

Bangor Township Schools/ Central Elem Bangor Township Schools/ Christa Mcauliffe Middle

Bay City

Bangor Township Schools/ John Glenn High

Project Description Start Date Lincoln Write Board Technology would enhance the education of students by providing interactive student teacher learning 4/1/2009 West Write Board Technology would enhance the education of students by providing interactive student teacher learning 4/1/2009 Central Write Board Technology would enhance the education of students by providing interactive student teacher learning 4/1/2009 CMMS Write Board Technology would enhance the education of students by providing interactive student teacher learning 4/1/2009 JGHS Write Board Technology would enhance the education of students by providing interactive student teacher learning 4/1/2009

Bay City

Bangor Township Schools/ John Glenn High

JGHS Water Lines In/Out

6/8/2009

Bay City

Bangor Township Schools/ Central Elem

Central - Replace/Add cabinets/plumbing in the classrooms to reduce water usage

6/8/2009

Bay City

Bangor Twp School/ Lincoln Elem

Bay City Bay City

Funding Request

8/30/2009

$

60,000

8/30/2009

$

60,000

$

85,000

$

160,000

$

170,000

$

60,000

8/30/2009

$

70,000

Lincoln - Replace/Add cabinets/plumbing in the classrooms to reduce water usage

PP

8/30/2009

6/8/2009

8/30/2009

$

70,000

Bangor Township Schools/ West Elem

West - Replace/Add cabinets/plumbing in the classrooms to reduce water usage

6/8/2009

8/30/2009

$

70,000

West Parking Lot with Drainage

6/8/2009

8/30/2009

$

82,920

Bay City

Bangor Township Schools/ West Elem Bangor Township Schools/ Christa Mcauliffe Middle

6/8/2009

8/30/2009

$

85,000

Bay City

Bangor Township Schools/ John Glenn High

JGHS Locker Replacement

6/8/2009

7/30/2009

$

150,000

Bay City

Bangor Township Schools/ Edison Adm

Edision Parking Lot with Drainage

5/1/2009

6/30/2009

$

217,820

Bay City

Bangor Township Schools/ John Glenn High

JGHS Tennis Courts Repair/Replace

5/1/2009

8/30/2009

$

250,000

Bay City

Central parking Lot with Drainiage

6/8/2009

7/30/2009

$

260,100

Bay City

Bangor Township Schools/ Central Elem Bangor Township Schools/ Christa Mcauliffe Middle

CMMS Parking Lot with Drainage

6/8/2009

8/30/2009

$

665,400

Bay City

Bangor Township Schools/ John Glenn High

John Glenn High School parking lot

6/8/2009

8/30/2009

$

1,104,920

Bay City

Bangor Twp School/ Lincoln Elem

Lincoln Parking Lot with Drainage

6/8/2009

7/30/2009

$

264,200

Beal City Public Schools District

The proposal would fund the update of our current HVAC controls system to allow the monitoring and scheduling of our heating and cooling systems. Too much energy is wasted in the heating and cooling of unoccupied spaces. The installation of the ASPECT controls system would allow control over weekend and holiday scheduling Project would and can be accessed via the web so that the system can be monitored outside of begin immediately school hours. This system even interfaces with weather forcasting sytems to provide following the accurate data for building scheduling. This type of control over our HVAC system will funding of the Eight weeks from greatly reduce energy consumption and costs. proposal. start date.

$

10,500

Beal City Public School Distirct

By installing variable speed pumps on our existing wells, Beal City Schools is working to reduce the amount of energy consumed annually. Variable speed pumps, which adjust the speed they run based on multiple well factors, has been proven to use 45% less energy than well pumps with standard electric motors. This proposal would fund the installation of variable speed pumps on (2) existing wells. 5/1/2009

$

21,000

e t tt

i m

ub

Beal City

Beal City

02262009

CMMS New Water Lines in/out

A T

st

e u

eq

s

O N

R d

S Beal City Public Schools

Expected Completion Date

Submitted Requests - Not Approved

8/30/2009 8/30/2009

O R 8/30/2009

5/8/2009

D VE

Route (Infrastructure Only)

468 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Beal City Public Schools

Beal City Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

Beal City Public School Distirct

The proposal would fund the purchase and installation of carbon dioxide detectors in our classrooms and offices. Currently, our air handling system brings in fresh outside air at timed intervals during day. Energy is burned in the process of moving that air inside and then heating or cooling it to reach optimum temperature levels inside. This proposal would fund the purchase and installation of carbon dioxide sensors that Project would would only bring fresh air into a room when it is needed, reducing energy costs. This begin immediately project is a green project because it will help to reduce energy consumption by our following the current heating and cooling system and it will also work to improve the air quality in funding of the Eight weeks from our classroooms and offices. proposal. start date.

Beal City Public School Distirct

This proposal would fund the purchase and installation of unit ventilators in nineteen classrooms. These are modern units capable of being connected to a control system. The current units and manually controlled and waste energy and money by running when they are not needed. By placing new units that can be controlled by a computer based software system, we can greatly reduce the amount of energy we are using each year. The system can then control the production of the units on evenings, weekends and holidays. This proposal would bring the district to 100% energy efficient units in our classrooms. 4/1/2009

Beal City

Beal City Public Schools - Carl D. Mayes Elementary

This project will renovate a current elementary classroom and convert it to a modern computer lab. This lab will have to be wheelchair accessible due to a wheelchair bound student in our population. Additional electrical circuits will need to be added to the room to accommodate the technology and the room will need to be wired to connect to the District's local area network. This lab will provide technology access to over three hundred students, giving them the tools needed to develop their technologyProject would skills. The classroom in question is available and work would begin immediately begin immediately following the funding of this proposal. Bids have been prepared and will be sent out tofollowing the local contractors immediately following the funding of this proposal. Expected funding of the Six weeks from completion time would be six weeks out from the start date. proposal. start date.

Belding

Construct a fiber optics backbone (network) connecting Lakewood Public Schools, Belding Area Schools, Ionia Public Schools, Portland Public Schools, Palo Community Schools, Berlin Township School, Easton Township School, Ionia Township School, Ionia County Intermediate School District Fiber Grattan Academy and Threshold Academy to the Ionia County Intermediate School District for instruction and management services. 7/1/2009 Optics

Belleville

Van Buren Public Schools, District Wide

Beal City

Beal City

O R

Funding Request

D VE $

32,300

$

75,600

$

70,500

6/30/2010

$

1,957,500

8/1/2010

$

1,100,000

Bellevue Community Schools Middle School/High School

Consolidate the current Bellevue High School and Middle School facilities into one expanded and improved facility utilizing the existing high school as that facility to host grades 7-12. To do this the district will partially renovate select areas of the existing building and add six new classrooms, two new science labs, two new computer labs, a new gym and locker rooms, replace doors, windows and roof, upgrade and install a new security system and all current technology. We will also upgrade the existing football field, add new lighting, bleachers and press box. July, 2008

December, 2009

$

13,720,410

Bellevue Community Center

Convert use of former Elementary into a community center that will house community activities as well as the District's age 0-5 Day Care and Preschool Program and Administration. Existing areas remain as-is with the exception of minor remodeling in select areas and upgraded mechanical in the gymnasium and replacement of wood floor in gymnasium.July, 2008

December, 2009

$

436,260

T O

P P A

7/31/2009

Route (Infrastructure Only)

N s

Beal City Public Schools

Ionia ISD Van Buren Public Schools

Bellevue Community Schools

Bellevue Community Schools

Bellevue

Bellevue

02262009

tt i m

d e t

b u S

t s e

qu

e R

Provide a new high-speed fiber optic network between all of the district schools.

Submitted Requests - Not Approved

8/1/2009

469 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bellevue Community Schools

Bellevue Community Schools

Bellevue Community Schools

Project Name

Project Description

Start Date

Bellevue

Bellevue Community SchoolsRemodeling/Improvements to Existing areas of Elementary School Project

Additional remodeling and improvements not addressed by bond issue project including; Replace existing boiler system and HVAC units, upgrade controls, replace existing roof and upgrade insulation, replace windows and exterior doors and remodel all existing classrooms, replaceexisting lighting and controls. Install new technology infrastructure and computers for the remodeled classrooms. Expand parking lot and lighting and outdoor instructional area and playground areas. Imediately

Bellevue

Bellevue Community SchoolsRemodeling/Improvements to Bellevue Community Center

Additional remodeling and improvements not addressed by bond issue project including; Remodel current classrooms to better meet the needs of the age 0-5 programs and administration. Upgrade/replace all ceilings, electrical lighting and controls; Replace roof and upgrade insulation, replace exterior doors.

Bellevue community SchoolsRemodeling/Improvements to the Middle School/High School Facility

Additional remodeling and improvements not addressed by bond issue project including; Replace HVAC units & upgrade existing mechanical system, replace roof and upgrade insulation, replace all exterior doors, and upgrade security system and current technology infrastructure. Additional remodeling of existing classrooms to replace ceilings, electrical lighting and contols. Replace existing parking, expand the parking lot and replace parking lot lighting for security and energy efficiency. Imediately

Bellevue Community Schools-Bellevue Elementary School Ionia County Intermediate School District Alternate Energy

Convert the current Middle School into a facility to host Pre-School - 6th Grade students. To do this we will construct new classrooms, remodel the cafeteria, restrooms, partially remodel select classrooms areas and computer lab. We will replace chalkboards and install new computers, printers, servers for additions. Site work will include a new bus loop, parking lot with lighting, an outdoor learning area, new sidewalks, signage, landscaping and playground areas. July, 2008 Construct 3 wind turbines for a "renewable energy" source for operations of the Ionia County Intermediate School District. 7/1/2009 Replace all of the asphalt paving and most of the concrete walks, upgrade drainage and widen the main student drop off area to improve student and staff safety. Construct canopy structure to shield wheelchair bound students from the weather while being loaded and unloaded onto school buses. Provide fiber connections to all Berrien county school districts

Bellevue

Bellevue Community Schools

Bellevue

Ionia ISD

Berlin Township

T O

Funding Request

2,825,000

December, 2009

$

3,054,000

December, 2009

December, 2009

$

3,456,000

December, 2009

$

8,898,790

12/31/2009

$

225,000

6/15/2009

6/30/2009

$

190,000

6/15/2009 8/30/2009

8/31/2009 8/30/2010

$ $

275,000 3,500,000

O R

P P A Imediately

N s

Ionia ISD

Berlin Township

Ionia ISD Berrien ISD Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools

Berlin Township Berrien county

Ionia County Intermediate School District Freedom Acres Parking Lot Repairs and Improvements Ionia County Intermediate School District Freedom Acres Canopy Berrien RESA Fiber

Big Rapids

Big Rapids Public Schools - Middle School

Replace 14 aged air handlers

5/1/2009

9/1/2009

$

210,000

Big Rapids

Big Rapids Public Schools - Middle School

Replace aged digital projectors

6/1/2009

9/1/2009

$

8,400

Big Rapids

Big Rapids Public Schools - Brookside Elem

1 digital projector per classroom

6/1/2009

9/1/2009

$

12,000

Big Rapids Public Schools - Eastwood Elem

1 digital projector per classroom

6/1/2009

9/1/2009

$

12,000

Big Rapids Public Schools - Hillcrest Elem

1 digital projector per classroom

6/1/2009

9/1/2009

$

12,000

Big Rapids Public Schools - Riverview Elem

1 digital projector per classroom

6/1/2009

9/1/2009

$

12,000

Big Rapids Public Schools-Eastwood Elem

Teacher computer for each classroom

6/1/2009

9/1/2009

$

12,000

Big Rapids

Big Rapids Public Schools-Hillcrest Elem

Teacher computer for each classroom

6/1/2009

9/1/2009

$

12,000

Big Rapids

Big Rapids Public Schools - Middle School

Teacher computer for each classroom

6/1/2009

9/1/2009

$

33,000

R d

ub

Big Rapids

Big Rapids

02262009

e t tt

i m

Big Rapids

Big Rapids

eq

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

st

e u

Expected Completion Date

470 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools Big Rapids Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Big Rapids

Big Rapids Public Schools -District

Clerical/Administration computers

6/1/2009

9/1/2009

$

35,200

Big Rapids

Big Rapids Public Schools - Middle School

Replace air conditioning units

6/4/2009

8/4/2009

$

45,000

Big Rapids

Big Rapids Public Schools - Brookside Elem

Replace air conditioning units

6/4/2009

8/4/2009

$

50,000

Big Rapids

Big Rapids Public Schools - Eastwood Elem

Replace air conditioning units

6/4/2009

8/4/2009

$

50,000

Big Rapids

Big Rapids Public Schools - Hillcrest Elem

Replace air conditioning units

6/4/2009

$

50,000

Big Rapids

Big Rapids Public Schools - Brookside Elem

Replace aged roof

6/4/2009

$

76,461

Big Rapids

Big Rapids Public Schools - Hillcrest Elem

Replace aged roof

6/4/2009

8/15/2009

$

76,461

Big Rapids

Big Rapids Public Schools - Riverview Elem

Replace aged roof

PP

8/15/2009

6/4/2009

8/15/2009

$

76,461

Big Rapids

Big Rapids public Schools - Bus Garage

Replace metal roof

6/4/2009

7/4/2009

$

81,000

Big Rapids

Big Rapids Public Schools - Middle School

Install video surveillance system

5/1/2009

7/1/2009

$

25,000

Big Rapids

Big Rapids Public Schools - Brookside School Replace carpet in building

4/1/2009

6/1/2009

$

33,000

Big Rapids

Big Rapids Public Schools - Eastwood School Replace carpet in building

4/1/2009

6/1/2009

$

33,000

Big Rapids

Big Rapids Public Schools - Hillcrest School

4/1/2009

6/1/2009

$

33,000

Big Rapids

Big Rapids Public Schools - Riverview School Replace carpet in building

4/1/2009

6/1/2009

$

33,000

Big Rapids

Big Rapids Public Schools - Middle School

Replace carpet in building

4/1/2009

6/1/2009

$

66,000

Big Rapids

Big Rapids Public Schools - Middle School

Replace/repair sidewlaks and retaining walls

5/1/2009

10/1/2009

$

207,153

Big Rapids

Big Rapids Public Schools - Hillcrest Elem

Replace aged parking lot

6/4/2009

6/30/2009

$

6,780

Big Rapids

Big Rapids Public Schools - Brookside Elem

Replace aged parking lot

6/4/2009

6/30/2009

$

9,992

Big Rapids Township

Big Rapids Public Schools _ Alternative Ed

Teacher computer for each classroom

6/1/2009

9/1/2009

$

3,300

Big Rapids Township

Big Rapids Public Schools - Central Office

New Server to support district software

6/1/2009

9/1/2009

$

4,000

m b u

e u

O N

R d

e t t

it

s

st

Replace carpet in building

eq

A T

O R 8/4/2009

D VE

Big Rapids Township

Big Rapids Public Schools - High School

Mass Media Lab

6/1/2009

9/1/2009

$

7,200

Big Rapids Township

Big Rapids Public Schools - High School

CAD Lab

6/1/2009

9/1/2009

$

17,600

Big Rapids Township

Big Rapids Public Schools - High School

Advanced Computer Lab

6/1/2009

9/1/2009

$

33,000

Big Rapids Township

Big Rapids Public Schools - High School

Teacher computer for each classroom

6/1/2009

9/1/2009

$

38,500

Big Rapids Township

Big Rapids Public Schools - central Office

Complete parking lot paving project

5/1/2009

5/30/2009

$

20,000

Big Rapids Township

Big Rapids Public Schools - High School

Replace video surveillance system

5/1/2009

7/1/2009

$

50,000

Big Rapids Township

Big Rapids Public Schools - High School

Replace carpet in building

4/1/2009

6/1/2009

$

132,000

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

471 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Big Rapids Public Schools Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birch Run Area School District Birmingham City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Big Rapids Township

Big Rapids Public Schools - High School

Replace aged driveway

6/4/2009

6/30/2009

$

257,992

Birch Run Township

Birch Run Area Schools

Replace Middle school Roof

5/1/2009

6/30/2009

$

245,000

Birch Run Township

Birch Run Area Schools

Replace Portion on HS Roof

5/1/2009

6/30/2009

$

60,000

Birch Run Township

Birch Run Area Schools

Replace Portion of Elem Roof

5/1/2009

6/30/2009

$

144,000

Birch Run Township

Birch Run Area Schools

Replace outside lighting at Elem with energy efficient lighting

6/15/2009

$

9,000

Birch Run Township

Birch Run Area Schools

Replace outside lighting with efficient lighting @ MS

6/15/2009

$

15,000

Birch Run Township

Birch Run Area Schools

Energy efficient lighting in hallways of Elem

6/15/2009

9/1/2009

$

30,000

Birch Run Township

Birch Run Area Schools

Install new exterior doors at the MS

PP

9/1/2009

6/15/2009

9/1/2009

$

32,000

Birch Run Township

Birch Run Area Schools

Replace Classroom windows in MS

6/15/2009

9/1/2009

$

40,000

Birch Run Township

Birch Run Area Schools

Technology upgrade and new computers

6/15/2009

9/1/2009

$

1,000,000

Birch Run Township

Birch Run Area Schools

New Boilers in Middle School

8/1/2009

11/1/2009

$

500,000

Birch Run Township

Birch Run Area Schools

Replace sidewalks from HS to Elem

6/15/2009

7/15/2009

$

4,000

Birch Run Township

Birch Run Area Schools

Pole Barn for district storage

6/15/2009

9/1/2009

$

70,000

Birch Run Township

Birch Run Area Schools

Demolition of old abandoned high school

6/15/2009

9/1/2009

$

145,000

Birch Run Township

Smart boards and projectors in all classrooms (Technology)

6/15/2009

9/1/2009

$

500,000

Bloomfield Hills

Birch Run Area Schools Birmingham Public Schools - West Maple Elemenatary

Close West Maple pool and convert space to classrooms

9/1/2008

8/15/2010

$

650,000

Bloomingdale

High School

7/1/2009

8/31/2009

$

350,000

Chesaning Union Schools

Brady Twp

Remodel/Update Brady Elementary: replace roof, replace/update HVAC and water systems, replace outdated play ground equipment, replace asbestos tiling, add art Chesaning Union Schools - Brady Elementary room, add classroom storage cabinets

6/10/2009

9/1/2010

$

1,766,500

Breckenridge Community Schools

Breckenridge

Breckenridge High School

School was built in 1966 and the windows are uninsulated. The windows should be replaced with energy efficient units. This improvement would save on energy costs.

6/1/2009

8/1/2009

$

96,000

Breckenridge High School

Upgrade ceilings and Install energy efficient T-8 lamp lighting and electric ballast in high school classes and hallways, resulting in more light and energy efficiency.

6/1/2009

8/1/2009

$

145,400

9/1/2009

$

715,000

8/1/2009

$

59,700

8/1/2009

$

139,000

Bloomingdale Public School District

Breckenridge Community Schools Breckenridge Community Schools Breckenridge Community Schools Breckenridge Community Schools

Breckenridge

u S

Breckenridge

st

e u

eq

s

A T

O N

R d

Add new HS cafeteria. One cafeteria currently services 2 buildings. Due to current situation and volume of students, the students are eating from 10:20 until 1:20.

e t t

it

bm

Breckenridge

Breckenridge High School

To abate the building of asbestos and demolish the 1936 building. 6/1/2009 Update emergency lighting to code and replace fire alarm system not meeting current requirements. 6/1/2009

Breckenridge

Breckenridge Elementary

Replace original carpet in corridors and classrooms.

02262009

Breckenridge Community Education

Submitted Requests - Not Approved

6/1/2009

O R 9/1/2009

D VE

Route (Infrastructure Only)

472 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bridgeport-Spaulding Community School District

BRIDGEPORT

Project Name

Project Description

Start Date

Expected Completion Date

MOVING THE DISTRICT TOWARDS A STAR RATED SCHOOL IN ALL POSSIBLE WAYS. EFFIENCIENT LIGHTING, STAGED BOILER REPLACEMENT, NEW CONTROLS, COMPUTER CONTROLED HAVC, EFFIECIENT WINDOWS, EFFIECIENT WATER CONTROLS, EDUCATION ON CONTROLS AND NEW EQUIPMENT, PAYED OVER TIME WITH SAVINGS IN ENERGY JUNE 1,2009

BRIDGEPORT SPAULDING COMMUNITY SCHOOLS

9/1/2009

Funding Request

D VE $

1,500,000

$

22,000,000

$

1,015,000

Bridgman Public Schools

Bridgman

Bridgman Public Schools

Brimley Area Schools

Brimley

Brimley Area Schools

acquiring, installing and equipping instructional technology for school facilities; equipping and re-equipping, furnishing and refurnishing and partially remodeling school facilities; purchasing school buses; constructing, equipping, developing and improving athletic/physical education facilities and play fields; and developing and improving sites. Acquiring, installing and equipping educational technology and purchasing school buses.

Bronson

The Bronson Community School system is currently involved in a facilities assessment. While in the preliminary stages, it appears that the elementary schools will be the focus of the most change. The building housing the junior and senior high school is approaching 50 years of age and is our youngest building. Plans for this building would be to make it energy efficent by replacing windows and doors Summer 2009

$

721,636

Branch ISD- Anderson Elementary School

Branch ISD's Head Start facility on the site of the Anderson Elementary School which is part of Bronson Community Schools is a 1992 modular building which is too small for the Head Start and Great Start School Readiness classes that operate in it. A permanent brick addition of four classrooms, approximately 6,000 sq ft, to the east side of the Anderson Elementary Schools will be constructed to replace this old 120 days from modular building. A parking lot will be added near the addition for the preschool 120 days from commencement of classrooms. approval of funds construction $

1,092,168

Brown City Community Schools, Brown City High School

School Building Roof Replacement: Project to replace the roof at Brown City High School. The high school building was built in 1972, has undergone countless roof repairs in the past few decades, and continues to develop numerous leaks. Patching the patches does not appear to be an option any longer. The current repairs required are so extensive that it would be more cost effective to replace the entire roof. Roof replacement would also add the benefit of a more energy efficient building. 6/11/2009

8/30/2009

$

430,000

Transportation Facility Project: The current transportation facility for Brown City Community Schools is housed in a 100-year old building located off campus. The building is not energy efficient and has multiple major problems, including a leaky roof and structural integrity. This project would entail building a new energy efficient transportation facility on the district’s campus. 9/1/2009

2/20/2010

$

400,000

Playground Project: The playground at Brown City Elementary School has not been updated or had additions in at least 11 years. Currently the playground, which plays host to 510 children daily (multiple times), is terribly outdated and often times not safe It is very common for us to close down slides to fix rusted and broken areas. Recently we have pushed for students to play in the open areas for soccer, football, basketball area, etc and stay away from our structures.Our playground does include slides, swings, monkey bars, funnel ball poles, and a wooden climbing structure. 6/11/2009

8/30/2009

$

200,000

Bronson Community School District

Branch ISD

Bronson

Bronson

Brown City Community Schools Brown City

Brown City Community Schools Brown City

Brown City Community Schools Brown City

02262009

T O

d e tt

t i m

Brown City Community Schools

b u S

Brown City Community Schools, Brown City Elementary School

Fall 2009

N s

st

e u

q e R

P P A

O R

Submitted Requests - Not Approved

Route (Infrastructure Only)

473 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Brown City Community Brown City/Maple Valley Schools Twp, Speaker Twp

Brown City Community Schools

Fiber Connectivity Project: Project to connect Brown City Community Schools (BCCS) to the existing Sanilac County school fiber network through a fiber optic installation from Brown City Community Schools to the Sanilac Intermediate School District (SISD) fiber route. The proposed project’s fiber route entails approximately 10 miles of fiber, running from the BCCS campus network to a fiber connect point 3 miles south of Peck. The resulting connectivity will result in decreased Internet costs for Brown City Community Schools, increased bandwidth for Brown City Elementary and Brown City High School, and increased collaboration with the Sanilac schools currentl on the fiber network. Planned collaborations include remote backup, online learning and assessment, interactive video and VoIP. Brown City Community Schools doubled bandwidth in 2008-2009 from 1.5 Mbps to 3.0 Mbps. This bandwidth is still not enough to meet the educational needs of students and staff. Unfortunately, in this rural area Internet options are limited. No DSL. Limited wireless. Costly leased circuits. In the long term, a fiber connection to our intermediate school district would be our most cos 6/1/2009

WoodhavenBrownstown School District

Brownstown Twp.

Woodhaven-Brownstown School District Gudith Elementary

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls

WoodhavenBrownstown School District

Brownstown Twp.

Woodhaven-Brownstown School District Wegienka Elementary

WoodhavenBrownstown School District

Brownstown Twp.

Woodhaven-Brownstown School District Brownstown Middle School

Buckley Community School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District

O R

P P A

Funding Request

$

150,000

8/1/2009

8/1/2011

$

1,300,000

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls

8/1/2009

8/1/2011

$

1,550,000

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls. Install energy efficient lighting.

8/1/2009

8/1/2011

$

2,450,000

18 months

$

11,750,000

Classrooms are needed, Buckley is at the capacity level. 9 through 12th grade classrooms will be built on to the existing gym that was built in 1996. This will leave the sufficient amount of classrooms we need to have early childhood program, after school program, and all day kindergarten, counselors room, and title classroom. This will give the publications its own class. Seven Classrooms will be built. This will require Bids, Engineer, contractor, site preparation. With the classrooms, furniture will be needed and technology upgrades with computers, server, phone system. 5/1/2010

5/1/2012

$

15,000,000

Mechanical & Electrical Upgrades

6/15/2009

7/15/2009

$

10,000

Mechanical & Electrical Upgrades

6/15/2009

7/15/2009

$

10,000

Renovate and upgrade kitchen

6/15/2009

8/15/2009

$

20,000

Renovate and upgrade kitchen

6/15/2009

8/15/2009

$

20,000

Renovate and upgrade kitchen

6/15/2009

7/15/2009

$

20,000

Renovate and upgrade kitchen

6/15/2009

7/15/2009

$

50,000

Mechanical & Electrical Upgrades

6/15/2009

7/15/2009

$

60,000

Mechanical & Electrical Upgrades

6/15/2009

7/15/2009

$

100,000

Renovate restrooms to include barrier-free access

6/15/2009

8/15/2009

$

150,000

T O

N s

t s e

Route (Infrastructure Only)

D VE

5/1/2010

Renovation of our middle school from its original open concept design of the 1970's to Buchanan Community Schools Middle School a more appropriate learning space consistent with 21st century teaching and learning Renovation styles. A description of the project is attached. Please refer to pages 8 and 9. 120 Days

Buchanan Community Schools Buchanan

Expected Completion Date

u q e

Buckley Buena Vista Township Buena Vista Township

Buena Vista Township

S

Buena Vista Township

Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township

02262009

e t t

it

m b u

Buena Vista Township

R d

Buckley Community Schools Buena Vista School District- Brunkow Elementary Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Buena Vista High School Buena Vista School District- Ricker Middle School Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Brunkow Elementary Buena Vista School District- Ricker Middle School Buena Vista School District- Buena Vista High School Buena Vista School District- Doerr Early Childhood Center

Submitted Requests - Not Approved

474 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Whittemore-Prescott Area Schools Whittemore-Prescott Area Schools Whittemore-Prescott Area Schools Whittemore-Prescott Area Schools

Location City or Township

Buena Vista Township

Project Name Buena Vista School District- Brunkow Elementary Buena Vista School District- Ricker Middle School Buena Vista School District- Buena Vista High School Buena Vista School District- Buena Vista High School Buena Vista School District- Ricker Middle School Buena Vista School District- Brunkow Elementary Buena Vista School District- Buena Vista High School Buena Vista School District- Brunkow Elementary Buena Vista School District- Ricker Middle School Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Ricker Middle School Buena Vista School District- Buena Vista High School Buena Vista School District- Buena Vista High School Buena Vista School District- Buena Vista High School Buena Vista School District- Ricker Middle School

Burleigh

High School

Burleigh

High School

Burleigh

High School

Burleigh

Elementary

Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township

Whittemore-Prescott Area Schools

Burleigh

Atherton Community Schools

Burton, MI

Byron Area Schools

Byron

Byron Area Schools

Byron Area Schools

Byron Area Schools

Byron

Byron

Byron

02262009

ub

S

Start Date

Funding Request

Renovate restrooms to include barrier-free access

6/15/2009

8/15/2009

$

200,000

Renovate restrooms to include barrier-free access

6/15/2009

8/15/2009

$

250,000

Renovate auditorium - stage flooring and HVAC

6/15/2009

7/15/2009

$

400,000

Update electrical panel and low voltage control

6/15/2009

7/1/2009

$

15,000

Update electrical panel and low voltage control

6/15/2009

$

30,000

Update pla;yground

6/15/2009

$

45,000

Replace floor tiles

PP

8/15/2009

6/15/2009

8/15/2009

$

60,000

6/15/2009

8/15/2009

$

100,000

6/15/2009

8/15/2009

$

123,000

7/10/2009

8/10/2009

$

143,000

7/15/2009

8/15/2009

$

290,000

6/15/2009

8/15/2009

$

300,000

6/15/2009

8/15/2009

$

350,000

Locker room renovation and upgrade 7/15/2009 Renovate athletic facilities - baseball field, running track, tennis courts, site drainage system, and landscape the campus 6/15/2009

8/15/2009

$

375,000

8/15/2009

$

700,000

Computer Lab Addition

6/1/2009

8/31/2009

$

200,000

6/1/2009

8/31/2009

$

500,000

6/1/2009

8/31/2009

$

700,000

6/1/2009

8/31/2009

$

700,000

Science/Metal Shop/Woodshop renovation. Renovation would include the installation of a clean air system and complete renovation to the existing metal shop and woodshop 6/1/2009

8/31/2009

$

900,000

A T

Fencing Replace Gym Floor Resurface parking lot Locker room renovation and upgrade

s

O N

Renovate and upgrade science labs Renovate athletic facilities - baseball field, storage building, tennis courts, and landscape the campus

e u

st

eq

R d

e t t

t i m

High School

Project Description

Expected Completion Date

High School toilet room renovation utilizing low flow water sensors High School main entrance and office renovation. This would include barrier free accessibility and additional security. Replace and repair elementary roof including the installation of a higher R-value insulation for heating efficiency.

O R 7/1/2009

D VE

Purchase Busses -Atherton High School (HS); Purchase 5 Energy Efficient Busses to be used for daily routes and extra curricular Middle School (MS); & Van Y Elementary (VY) activities. To conserve energy and money we want to install new insulation, thermostats and Byron Area Schools-Energy Savings enery conserving windows in our existing buildings.

ASAP

8/1/2010

$

500,000

Jun, 2009

Oct, 2009

$

120,000

Byron Area Schools-Lighting Upgrades

To conserve energy and money we want to complete the project we have begun to replace all of the lighting in our buildings with more efficient lighting and install a control and monitor system

May, 2009

Sept, 2009

$

150,000

Byron Area Schools-Preschool/Childcare

Our preschool and childcare need a new building. They are currently housed in 15 year old portables that are not only uncomfortable, but very inefficient to heat and maintain

May, 2009

May, 2010

$

200,000

Heating Plant

Our school would like to update our heating plants with new boilers and new control systems. We currently are using the original boilers (circa 1960) and have no automated controls.

May, 2009

Sept, 2009

$

250,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

475 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Byron Area Schools

Byron Area Schools

Byron Area Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools Byron Center Public Schools

Cadillac Area Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

Byron Area Schools-Building Upgrades

We would like to increase the available physical education space for our secondary students. Our current space is shared between high school and middle school students; often during the same hour.

May, 2009

Sept, 2010

Byron

Building Upgrades

Our buildings are very dated and lack many of the modern features of newer buildings We would like to renovate our existing buildings, add classrooms, add a common library for our secondary students, expand our elementary cafeteria and build a common cafeteria for our secondary students May, 2009

Sept, 2010

Byron

Byron Area Schools-Byron High School Career Tech

We currently offer a number of Career and Technical Education opportunities for our students. The facilities are aging. We would update and equip our metal machining, construction trades and computer aided drafting rooms. May, 2009

Byron

Byron Township Byron Township Byron Township Byron Township

Byron Township Byron Township

Byron Township Byron Township Byron Township

Cadillac

Byron Center Public Schools - Byron Center District Services Learning Center - Roof Byron Center Public Schools - All Buildings HVAC Controls Replacement Byron Center Public Schools - Nickels Intermediate School - HVAC Work Byron Center Public Schools - Brown School HVAC Work Byron Center Public Schools - Northwest Elementary - Early Childhood Space Byron Center Public Schools - Marshall Elementary School - Parking Lot

Caledonia Community Schools Caledonia Township Caledonia Community Schools Caledonia Township

u S

Repace the obsoleted controls systems on all HVAC systems

T O

Partial replacement and upgrade of HVAC system

N s

Partial replacement and upgrade of HVAC system

Renovation of unused school into early childhood center

st

Partial repacement, repair and resurfacing of parking lot

e u

d e t

itt

q e R

Caledonia Energy Efficient lighting upgrades

bm

Caledonia Energy efficient Boiler replacements

Caledonia Roof Replacements

D VE

Aug, 2009

$

15,000

6/1/2009

8/1/2009

$

125,000

6/1/2009

8/1/2010

$

750,000

6/1/2009

10/1/2009

$

600,000

6/1/2009

10/1/2009

$

1,500,000

8/1/2009

6/1/2010

$

400,000

6/1/2009

8/1/2009

$

250,000

6/1/2009

8/1/2009

$

250,000

6/1/2009

8/1/2009

$

600,000

8/1/2009

10/1/2009

$

60,000

$

8,225,000

O R

6/15/2009

8/25/2009

$

460,000

The 2007 school construction bond included money for renovations in 6 buildings. 4 of those buildings would greatly benefit by replacing old boilers with energy efficient boilers. 7/15/2009 The Caledonia school buildings have several roof sections that are beyond their life expectancy and need to be replaced. 6/15/2009

10/1/2009

$

1,200,000

8/25/2009

$

1,870,000

9/1/2011

$

2,800,000

12/1/2010

$

4,500,000

Plymouth-Canton Community Schools

Canton Township

New technical training center located at the Districts 3 high school site / It will be a magnet school attracting students from other Districts / it will provide better utilization of the Districts crowded high school facilities/ provide career path planning for PCCS - New Career & Technical and Adult Ed students / new school will include innovative program supported with seamless Training Center technology / capacity = 800 students / designed to gain LEED Certification 1/12/2010

Plymouth-Canton Community Schools

Canton Township

PCCS - Canton High School remodeling

02262009

1,000,000

8,000,000

remodeling, equipping and re-equipping school buildings; acquiring, installing and equipping school buildings for technology; purchasing school buses; remodeling and improving an athletic facility and a playground; and developing and improving sites? The 2007 school construction bond included money for 50% of 2 buildings to get an energy efficient lighting upgrade. With additional funds we could upgrade all of the lighting in these buildings.

$

$

P P A

Byron Center Public Schools - Byron Center Renovation of old HS shop & machine tool training areas into classrooms and other High School - Classroom Renovation teaching space Byron Center Public Schools - Byron Center High School - Parking Lot Partial repacement, repair and resurfacing of parking lot Byron Center Public Schools - Transportation Storage Relocation Addition to District transportation/storage facility

Cadillac Area Public Schools

Caledonia Community Schools Caledonia Township

Roof Repair/Replacement

Funding Request

Remodel existing Classrooms, Cafeteria, and Kitchen to meet the needs of the growing population / improve science and technology equipment and facilities

Submitted Requests - Not Approved

6/1/2009

Route (Infrastructure Only)

476 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Plymouth-Canton Community Schools

Plymouth-Canton Community Schools Universal Academy

Canton Township

Canton Township Canton Township

Project Name

Project Description

Start Date

Plymouth Canton - Canton High School remodeling

Remodel existing Classrooms, Cafeteria, and Kitchen to meet the needs of the growing population / improve science and technology equipment and facilities

Plymouth Canton - New Career & Technical and Adult Ed Training Center Universal Academy

New technical training center located at the Districts 3 high school site / It will be a magnet school attracting students from other Districts / it will provide better utilization of the Districts crowded high school facilities/ provide career path planning for students / new school will include innovative program supported with seamless technology / capacity = 800 students / designed to gain LEED Certification 1/12/2010 Purchase land and construct new school facility 7/1/2009

Monroe Public Schools

Construct, remodel, equip and reequip, furnish and refurnish, and improve the buildings and sites for Eyler, Niedermeier, Ritter, and Sterling Elementary Schools; acquire, prepare and develop a site, including playgrounds, and erect, construct, complete, equip, including equipping for technology, acquire technology, and furnish thereon a new elementary school building, including sitework; construct, remodel, equip and reequip, furnishing and refurnish, and improve the building and site, including relocation of tennis courts and remodeling of physical education facilities, at the existing high school; acquire a site for future construction for educational purposes; remodel and equip and re-equip, furnish and refurnish and improve building and site for Wagar Middle School. It is estimated that 4.86 mills ($4.86 per $1,000 of taxable valuation) will be levied in 2002. It is expected that the bonds will be outstanding for a period of not more than 30 years, exclusive of refunding, with an estimated simple average annual levy of property taxes of 3.47 mills ($3.47 per $1,000 of taxable valuation). 6/1/2009

High, Middle, McComb

Exterior Doors

T O

Monroe Public Schools Carleton Caro Community Schools Caro

Tuscola ISD

Caro

Tuscola ISD

Caro

Tuscola ISD

Caro

Tuscola ISD Caro Community Schools

Caro Caro

Tuscola ISD

Tuscola ISD

Tuscola ISD

Tuscola Intermediate School District/Tech Center HVAC Tuscola Intermediate School District Highland Pines School, A/C Tuscola Intermediate School DistrictAdministration Building, HVAC Tuscola Intermediate School District/Tech Center Lighting

q e R

12/1/2010

9/1/2011 4/1/2010

Funding Request

$

D VE $ $

28,000,000 11,000,000

8/15/2012

$

30,400,000

9/15/2009

$

23,000

7/30/2009

$

450,000

O R

P P A

N s

st

4/20/2009

Replace and upgrade air conditioning unit

5/1/2009

8/1/2009

$

30,000

Replace and upgrade heating/cooling system and controls in 1 building Lighting upgrade. Current lighting in halls and classrooms need to be upgraded for inproved efficiency.

3/1/2009

9/1/2009

$

30,000

3/1/2009

6/1/2009

$

50,000

9/15/2009

$

10,000

Caro

Ceiling tile and plaster 4/20/2009 Replace Commercial, Domestic Water Heating units - 3 units - current units 38 years old - replace with energy efficient units 6/1/2009

9/1/2009

$

25,000

Caro

Tuscola Intermediate School District Highland Pines School and Tuscola Technology Center, Boilers

Boiler Replacements - School Buildings - 2 boilers

tt i m

12/1/2009

$

200,000

Tuscola Intermediate School District/Tech Center Construction Lab

Expanded Construction Technology lab. This expansion will assist in accommodating green technologies related to construction and improved efficiencies in architectural design. 6/30/2009

10/1/2009

$

200,000

Tuscola Intermediate School District Highland Pines School and Tuscola Technology Center, Boilers

Boiler Replacements - School Buildings - 2 boilers

6/1/2009

12/1/2009

$

80,000

Caro

Caro Community Schools-Middle

Replace bathroom

5/20/2009

8/15/2009

$

20,000

Caro

Middle

Replace bathroom

5/20/2009

8/15/2009

$

20,000

Caro

Caro Community Schools-McComb/Schall

Install energy efficient lighting

6/20/2009

9/15/2009

$

140,000

ub

Caro

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

4,500,000

McComb/Schall Tuscola Intermediate School District, Water Heaters

Caro

Tuscola ISD Caro Community Schools Caro Community Schools Caro Community Schools

d e t

6/1/2009

Upgrade heating and air conditioning system. The current heating and air conditioning system is approximately 30 years old. New controls and related equipment will reduce energy consumption. 3/1/2009

e u

Expected Completion Date

6/1/2009

477 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Caro Community Schools Caro Caro Community Schools Caro Caro Community Schools Caro

Tuscola ISD

Tuscola ISD

Caro

Caro

Tuscola ISD

Caro

Tuscola ISD

Caro

Project Name

Project Description

McComb/Schall

Start Date

Install energy efficient lighting

9/15/2009

$

140,000

Caro Commnuty Schools-Middle/High Schools Install damages hardwood gym floor

6/20/2009

9/15/2009

$

200,000

Middle/High Schools

Install damages hardwood gym floor

6/20/2009

9/15/2009

$

200,000

Tuscola Intermediate School District Highland Pines School, Bus Parking Lot

Additional bus parking lot with new exit and entrance drives to improve traffic flow includes fueling facility and electrical stantions - locates transportation vehicles closer to building to reduce travel time to reduce fuel consumption 7/1/2009

$

250,000

Tuscola Intermediate School District Highland Pines School, Transition

Build Center-Based Transition building for secondary/young adult cognitively impaired students - provide job training, life skills experience, and community access for special needs students 3/1/2009

P P A

6/1/2010

$

800,000

9/1/2009

$

40,000

4/1/2009

Install building entry systems at Tech Center, Main Office and Highland Pines School. System would allow proximity card access, automatic lock down for school safety, automated alarms in case a door is propped open, scheduled locking/unlocking based on time of day. The system would interface with our existing security cameras. One new door would be installed at HPS to improve building safety. 3/1/2009

T O

Tuscola Intermediate School District - Door Security Tuscola Intermediate School District, Storage Roof Roof Replacement on Storage Building - current roof 30 years old

N s

$

42,000

8/1/2009

$

60,000

12/1/2009

$

60,000

9/1/2009

$

70,000

3/1/2009

8/1/2009

$

70,000

Replace 6 aging computers labs, 5 in the Tech Center and 1 at the Transition Center. 4 are PC labs, 2 are mac labs. Labs are used for Special Ed and CTE students as well as by the community through enrichment classes and MI Works clients as part of a program called Designed By You that offers one to one computer training for peopling seeking jobs. 3/1/2009

9/1/2009

$

110,000

3/1/2009

6/30/2009

$

25,000

Tuscola Intermediate School District - LAN

Caro

Tuscola Intermediate School District Highland Pines School and Tuscola Technology Center, Fire Alarm

Security, Fire Alarm System upgrade - special needs school facility - current system 30+ years old - no longer meets fire safety standards

Tuscola ISD

Caro

Replace aging network servers used for file storage, e-mail storage, firewall, network security, printing, etc. 4 Servers with adequate processor, ram, operating system and Tuscola Intermediate School District - Servers disk storage capacity, including SAN device for primary storage. 3/1/2009

Tuscola ISD

Caro

Tuscola Intermediate School District - copiers Replacing aging copy machines at Tech Center and Main Office with new machines

Tuscola ISD

Tuscola ISD

Tuscola ISD

t s e

u q e

R d

e t tt

Caro

Tuscola Intermediate School District Computer Labs TTC and Prep

Caro

Replace phone and voice mail servers with new hardware. District has an existing Tuscola Intermediate School District - Phone contract on the software but servers are now too old to run it and already has phone System and internal network equipment in place.

Caro

Tuscola ISD

Caro

Tuscola ISD

Caro

Tuscola ISD

Caro

02262009

i m

b u S

Tuscola Intermediate School District Wireless

Tuscola Intermediate School District Highland Pines School and Tuscola Technology Center, Generators Tuscola Intermediate School District Highland Pines School, Sidewalks Tuscola Intermediate School District, Manhole/Water Retention

O R 11/1/2009

D VE

12/1/2009

Caro

Tuscola ISD

Funding Request

6/20/2009

Replace network switches at Tech Center, Main Office, and Transition Center. Current equipment is 6 years old and becoming inadequate for current needs as well as being out of warranty. New switches would be 48 port 10/100/1000 with POE and capable of multi-vlan support. 3/1/2009

Tuscola ISD

Expected Completion Date

Expand wireless infrastructure at all buildings on TISD campus with wireless - N standard access points and a controller server for management. Allows for more secure wireless access, better coverage and separate public/private access for security.

4/1/2009

3/1/2009

8/1/2009

$

30,000

New Backup, Emergency Generators for 2 buildings, one of the generators will have a direct impact on the ability of the Tuscola County Sheriff and Central Dispatch to function as they receive Internet access from TISD. 4/1/2009

8/1/2009

$

20,000

Sidewalk Replacement - around school facilities

6/1/2009

12/1/2009

$

20,000

Manhole reinforcements - water retention collection repair

6/1/2009

10/1/2009

$

50,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

478 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Tuscola ISD

Caro

Tuscola ISD Caro Community Schools Caro Community Schools Caro Community Schools

Caro

Caro

Tuscola ISD

Caro

Tuscola ISD

Caro

Tuscola ISD

Tuscola ISD

Start Date

Funding Request

6/1/2009

12/1/2009

$

60,000

6/1/2009

12/1/2009

$

75,000

High, Middle, McComb Caro Community Schools-High, Middle, McComb/Schall

Add cameras and wiring to our security system

4/20/2009

9/1/2009

$

30,000

Technology Infrastructure

5/20/2009

9/1/2009

$

67,000

Technology Infrastructure

5/20/2009

$

67,000

Carpet Replacement - School Building - 70,000 sq ft building

6/1/2009

$

120,000

Surface water retension upgrades

PP

8/31/2009

7/1/2009

11/1/2009

$

35,000

Caro

High, Middle, McComb/Schall Tuscola Intermediate School District Highland Pines School, Carpet Tuscola Intermediate School District, Water retension upgrades Tuscola Intermediate School District Administrative Building, Parking Lots

7/1/2009

11/1/2009

$

75,000

Caro

Tuscola Intermediate School District Highland Pines School and Tuscola Technology Center, Resurface Parking Lots

7/1/2009

11/1/2009

$

200,000

Install fiber optic network to all local schools within Tuscola ISD. TISD already has a connection to a regional ISD fiber network that would facilitate a connection to a state backbone. TISD has 9 local districts, none of which are currently connected to the ISD with any type of high bandwidth connection. 3/1/2009

3/1/2011

$

2,100,000

Bus Repair Maintenance Facility

7/1/2009

5/1/2010

$

200,000

July, 2009

Nov. 2009

$

250,000

$

350,000

Caro Caro

Carson City

Tuscola Intermediate School District Network Infrastructure Tuscola Intermediate School District Highland Pines School, Bus Facility Carson City-Crystal Area Schools, Carson Elementary

Carson City

Carson City-Crystal Area Schools, Carson Elementary

Carson City

Carson City-Crystal Area Schools

Caro

Tuscola ISD Carson City-Crystal Area Schools

Caro

Cass City Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools

Project Description Upgrade Playground to new federal standards Replace Existing Therapy Pool for Sensory and Rehabilitative services to disabled students

Tuscola ISD

Carson City-Crystal Area Schools Carson City-Crystal Area Schools

Project Name Tuscola Intermediate School District Highland Pines School, Playground Tuscola Intermediate School District Highland Pines School, Therapy Pool

Expected Completion Date

Cass City Cassopolis

ub

Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis

02262009

S

Resurfacing existing parking lots at 2 school facilities

st

s

e u

O N

Replace existing 30 year old roof.

eq

Move school office to entrance from the middle of the building for logistics and safety and renovate old office into classrooms and conference area. Upgrade electrical. September, 2009 February, 2010

e t tt

R d

Cass City Public Schools Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Sam Adams Elementary

i m

Cassopolis

A T

Parking Lot replacement - 2 parking lots

O R 9/1/2009

D VE

Resurface, seal, repair and re-stripe all existing parking lots.

May, 2009

Nov. 2009

$

175,000

Site work, Mechanical upgrades, new windows & doors, 4 new busses, four new roofs, remodel bus garage, remove and replace althletic track, update technology and technology infrastructure.

8/1/2008

8/1/2009

$

6,900,000

Mechanical room controls

5.1.09

12.1.09

$

12,000

Fresh air intake/duct controls

5.1.09

12.1.09

$

21,000

Heat exchanger and pumps

5.1.09

12.1.09

$

36,000

Mezzaninin mechanical upgrades

5.1.09

12.1.09

$

40,000

Ventilator controls

5.1.09

12.1.09

$

46,000

Ventilator controls

5.1.09

12.1.09

$

61,000

DDC controls upgrade

5.1.09

12.1.09

$

80,000

Classroom ventilators

5.1.09

12.1.09

$

82,000

Classroom ventilators

5.1.09

12.1.09

$

113,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

479 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cedar Springs Public Schools Cedar Springs Public Schools Cedar Springs Public Schools Cedar Springs Public Schools Cedar Springs Public Schools Cedar Springs Public Schools

Center Line Public Schools

Center Line Public Schools

Center Line Public Schools

Center Line Public Schools

Center Line Public Schools

Location City or Township

Cassopolis

Project Name Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Ross Beatty Jr./Sr. High School

Primary piping replacement

5.1.09

Cedar Springs

Cedar Springs Public Schools

Boiler upgrades at Beach Elementary and High School.

4/20/2009

Cedar Springs

Cedar Springs Public Schools

Cedar Springs

Cedar Springs Public Schools

Cedar Springs

Cedar Springs Public Schools

Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis

Project Description

Start Date

Expected Completion Date

Funding Request

DDC control system

5.1.09

12.1.09

$

180,000

Mezzanine controls

5.1.09

12.1.09

$

199,000

Air conditioning

5.1.09

12.1.09

$

380,000

Kitchen remodel and equipment 5.1.09 Remodel empty classroom space to consolidate central office/alt adult ed building into Jr./Sr. high 5.1.09

12.1.09

$

289,000

$

354,600

12.1.09

$

365,000

5/20/2009

$

150,000

5/4/2009

$

7,500

3/16/2009

$

40,000

6/15/2009

7/15/2009

$

240,000

6/15/2009

A T

PP

Replacement of windows at Beach Elementary and installation of screens. Current windows are inefficient and there is no screening to allow for appropriate ventalation. 6/15/2009 Replacement of sidewalk at middle school. Current sidewalk must be removed, the site regraded and new cement poured. 4/20/2009 Replacement of leaking water main. Projects includes excavation, pipe replacement, and replacement of asphalt. 3/2/2009

O N

O R 12.1.09

D VE

7/15/2009

Cedar Springs

Cedar Springs Public Schools

Cedar Springs

Cedar Springs Public Schools

Road/Parking lot resurfacing and striping. The majority of our campus requires road/parking lot resurfacing. Additional parking space is needed and drainage work will need to be done. Gym floor replacements at Beach Elementary and Cedar View Elementary. Current floors are old and contain hazardous material.

8/15/2009

$

250,000

Center Line

Center Line Public Schools Wolfe Middle School

Computer Upgrade. This project is for the upgrade of eight year old computers. The new computers will reduce energy cost by approximately 30% as a result of monitors which will use 33% less energy and programming that monitors and power down computers when not in use. 5/1/2009

6/30/2009

$

161,000

Center Line

Computer Upgrade. This project is for the upgrade of eight year old computers. The new computers will reduce energy cost by approximately 30% as a result of monitors Center Line Public Schools Center Line High which will use 33% less energy and programming that monitors and power down School computers when not in use. 5/1/2009

6/30/2009

$

250,000

Center Line

Network Wiring. This project is to wire Center Line High School for data and voice in each classroom. The project includes low voltage copper and fiber cabling for internet Center Line Public Schools Center Line High phone, building security, and data access. The new wiring will assist in the control of School HVAC units and door security. 4/13/2009

5/1/2009

$

140,000

School Improvement. This project will assist in transforming instruction in all classroom by installing projectors and document cameras in each classroom. The equipment in conjunction with training that the district will provide, will help teachers to greatly expand the tools and opportunities for each student. The overall goal is to Center Line Public Schools Miller Elementary reduce a reliance on paper for worksheets 5/1/2009

6/30/2009

$

39,900

Security System. This project is for the installation of a video security system at Wolfe Middle School which will allow school administration and first responders to record and monitor the activities around the building and in the hallways. This system will increase safety in the building and assist first responders in case of emergency. 5/1/2009

6/30/2009

$

90,000

d e tt

e u

st

q e R

s

Route (Infrastructure Only)

it

m b u

Center Line

Center Line

02262009

S

Center Line Public Schools Wolfe Middle School

Submitted Requests - Not Approved

480 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Center Line Public Schools

Center Line Public Schools Charlevoix Public Schools Charlevoix Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Charlotte Public Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools

Project Name

Center Line Public Schools Wolfe Middle School

Center Line

Project Description

Start Date

School Improvement. This project will assist in transforming instruction in all classroom by installing projectors and document cameras in each classroom. The equipment in conjunction with training that the district will provide, will help teachers to greatly expand the tools and opportunities for each student. The overall goal is to reduce a reliance on paper for worksheets 5/1/2009

School Improvement. This project will assist in transforming instruction in all classroom by installing projectors and document cameras in each classroom. The equipment in conjunction with training that the district will provide, will help teachers to Center Line Public Schools Center Line High greatly expand the tools and opportunities for each student. The overall goal is to School reduce a reliance on paper for worksheets 5/1/2009 Single pane windows throughout the middle school will be removed and replaced with Charlevoix Public Schools, Middle School energy efficient windows and shades. 6/1/2009

Center Line Charlevoix

Charlotte Charlotte

Charlotte Public Schools

Elevator Infrastructure Improvements @ Charlotte High School

Charlotte

Charlotte Public Schools

ASAP

Charlotte

Charlotte Public Schools

Flooring Replacement - District-wide (including asbestos abatement) Ceiling Tile and Grid - abatement and replacement @ Charlotte High School and all elementary buildings

Charlotte

Charlotte Public Schools

Doors and Window Replacements - District-wide

ASAP

Charlotte

Charlotte Public Schools

Playground Improvements @ All district elementary buildings (4) total

ASAP

Charlotte

Charlotte Public Schools

Charlotte

Charlotte Public Schools

Charlotte

Charlotte Public Schools

Charlotte

Charlotte Public Schools

Charlotte

Charlotte Public Schools

Charlotte

Charlotte Public Schools

Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan

02262009

S

D VE $

94,500

6/30/2009

$

128,100

8/30/2009

$

375,000

$

75,000

$

25,000

$

100,000

$

150,000

$

250,000

$

400,000

$

500,000

$

800,000

$

1,000,000

$

1,500,000

$

4,000,000

$

6,000,000

$

650,000

$

750,000

O R

Roof Replacements (Parkview and Weymouth Elementary Buildings) Plumbing Replacement and Improvements @ Charlotte High School and all elementary buildings (piping, fixtures, controls, valves, traps, etc...) Lighting Improvements - High School & Elementary Buildings (internal & external, security /egress/sensors, etc. ) Construction of an Auxiliary Gym w/ appropriate infrastructure amenities @ Charlotte High School Complete HVAC renovation at Charlotte High School with Web Based Building Automation DDC Energy Management System

ASAP

Casework and Cabinetry Replacement - District-wide Construction of Tennis Courts - 12 total @ Charlotte High School w/ appropriate infrastructure amenities

ASAP ASAP

EXTERIOR DOOR REPLACEMENT

6/1/2009

8/31/2010

$

25,000

REMODEL ENTRANCES

6/1/2009

8/31/2010

$

100,000

HEATING RENOVATION OF CLASSROOMS

6/1/2009

8/31/2010

$

150,000

REPLACE EXHAUST FAN UNITS

6/1/2009

8/31/2010

$

8,000

CHEBOYGAN AREA SCHOOLS EAST ELEM REPLACE EXHAUST FAN UNITS CHEBOYGAN AREA SCHOOLS WEST ELEM REPLACE EXHAUST FAN UNITS

6/1/2009

8/31/2010

$

8,000

6/1/2009

8/31/2010

$

8,000

ub

Cheboygan

Funding Request

8/30/2009 TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP TBD if funding provided - ASAP

tt i m

Charlotte

A T

6/30/2009

PP

The elementary school currently has walls that do not go to the ceiling; it is an "open atmosphere" building. We would like to modify the corridor walls and classroom doors 6/1/2009 Charlevoix Public Schools, Elementary School to close off individual classrooms and reduce noise. Web Based Building Automation DDC Energy Management System at the CPS Charlotte Public Schools Service Center ASAP

Charlevoix Township

Expected Completion Date

d e t

Charlotte Public Schools CHEBOYGAN AREA SCHOOLS HIGH SCHOOL CHEBOYGAN AREA SCHOOLS HIGH SCHOOL CHEBOYGAN AREA SCHOOLS HIGH SCHOOL CHEBOYGAN AREA SCHOOLS HIGH SCHOOL

st

e u

q e R

s

O N

Submitted Requests - Not Approved

ASAP

ASAP

ASAP ASAP ASAP ASAP

Route (Infrastructure Only)

481 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools

Location City or Township Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan Cheboygan

Chesaning Union Schools

Cheboygan

8/31/2010

$

10,000

NEW FLOORING IN FIELD HOUSE

6/1/2009

8/31/2010

$

20,000

POWER WASH & RESEAL BLDG EXTERIOR

6/1/2009

8/31/2010

$

20,000

RESURFACE OF TENNIS COURTS

6/1/2009

8/31/2010

$

30,000

EXTERIOR DOOR REPLACEMENT

6/1/2009

$

40,000

RESURFACING PARKING & DRIVE AREAS

6/1/2009

8/31/2010

$

50,000

BLEACHER REPLACEMENT

6/1/2009

8/31/2010

$

70,000

6/1/2009

8/31/2010

$

75,000

6/1/2009

8/31/2010

$

75,000

6/1/2009

8/31/2010

$

75,000

6/1/2009

8/31/2010

$

80,000

6/1/2009

8/31/2010

$

115,000

6/1/2009

8/31/2010

$

115,000

6/1/2009

8/31/2010

$

120,000

6/1/2009

8/31/2010

$

120,000

6/1/2009

8/31/2010

$

120,000

6/1/2009

8/31/2010

$

150,000

6/1/2009

8/31/2010

$

150,000

6/1/2009

8/31/2010

$

175,000

6/1/2009

8/31/2010

$

180,000

6/1/2009

8/31/2010

$

200,000

6/1/2009

8/31/2010

$

220,000

$

18,720,000

$

2,301,000

A T

APPLY VIC SYSTEM TO TERRAZZO TILE RECONDITIONING OF OUTSIDE TRACK RENOVATE KITCHEN REPAIR OUT SIDE OF BLDG & REPLACE PANELS

eq

Cheboygan Cheboygan Cheboygan

s

st

O N

m b u

Cheboygan Cheboygan

S

R d

e t t

it

Cheboygan

Funding Request

6/1/2009

CHEBOYGAN AREA SCHOOLS EAST ELEM PARKING LOT & DRIVE RECAP CHEBOYGAN AREA SCHOOLS HIGH SCHOOL REPLACE TEXTURE CEILING IN GYM CHEBOYGAN AREA SCHOOL MIDDLE SCHOOL PARKIN LOT REFURBISHING CHEBOYGAN AREA SCHOOLS BOARD OFFICE REPLACE ROOF OVER SHOP/GYM AREA CHEBOYGAN AREA SCHOOLS BUS GARAGE ADDITIONAL STOROAGE ADDED CHEBOYGAN AREA SCHOOLS HIGH SCHOOL REMODEL FOUR BATHROOMS CHEBOYGAN AREA SCHOOLS HIGH SCHOOL PARKING LOT REFURBISHING CHEBOYGAN AREA SCHOOLS HIGH SCHOOL ASBESTOS TILE REMOVAL & NEW FLOOR

Cheboygan

02262009

Start Date

FENCE REPLACEMENT @ FOOTBZALL FIELD

e u

Cheboygan

Chesaning

Project Description

CHEBOYGAN AREA SCHOOLS EAST ELEM ASBESTOS TILE REMOVAL & NEW FLOOR CHEBOYGAN AREA SCHOOLS WEST ELEM ASBESTOS TILE REMOVAL & NEW FLOOR CHEBOYGAN AREA SCHOOLS BUS GARAGE FINISH PARKING LOT/DRIVEWAY

Cheboygan

Chelsea School District Chelsea

Project Name CHEBOYGAN AREA SCHOOLS ATHLETIC FIELDS CHEBOYGAN AREA SCHOOLS ATHLETIC FIELDS CHEBOYGAN AREA SCHOOL MIDDLE SCHOOL CHEBOYGAN AREA SCHOOLS HIGH SCHOOL CHEBOYGAN AREA SCHOOLS BOARD OFFICE CHEBOYGAN AREA SCHOOLS WEST ELEM CHEBOYGAN AREA SCHOOLS ATHLETIC FIELDS CHEBOYGAN AREA SCHOOL MIDDLE SCHOOL CHEBOYGAN AREA SCHOOLS HIGH SCHOOL CHEBOYGAN AREA SCHOOLS WEST ELEM CHEBOYGAN AREA SCHOOLS BUS GARAGE

Expected Completion Date

Chelsea School District

erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping educational technology for school facilities; purchasing school buses; constructing, equipping, developing and improving physical education/athletic facilities play fields, and playgrounds; erecting storage buildings; and developing and improving sites?

Chesaning Union Schools - Big Rock Elementary

Remodel/Update Big Rock Elementary: install emergency lighting, replace light fixtures, replace HVAC, replace roof, replace lockers, remove asbestos, add art room, new library/media center, update computers

Submitted Requests - Not Approved

PP

O R

6/10/2009

8/31/2010

9/1/2010

D VE

Route (Infrastructure Only)

482 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Chesaning Union Schools Chesaning Union Schools Anchor Bay School District

Project Name

Project Description

Chesaning Union Schools - Chesaning High School

Chesaning

Start Date

Remodel/Update High School: upgrade HVAC, replace light fixtures, remove asbestos, replace carpeting, construct team rooms/bathrooms at stadium, correct the direction of the stadium, replace hallway ceilings, add auxilary gym, install projectors/smart boards, move soccer field 6/10/2009

Remodel/Update Middle School: replace roof, rebuild classroom walls, replace gym Chesaning Union Schools - Chesaning Middle floor, add auditorium scene shop, update computers, update security systems, School reconfigure main office, create play/fitness area. Anchor Bay School District Anchor Bay Middle School South Parking lot replacement

Chesaning Chesterfield

Expected Completion Date

9/1/2010

Funding Request

$

4,226,000

$

9,985,500

$

108,000

8/31/2010

$

3,185,325

60 days after start

$

228,000

None Set

$

575,000

9/1/2009

$

350,000

6/10/2009

9/1/2010

4/2/2009

10/1/2009

O R

D VE

Lapeer Community Schools City of Coldwater Community Schools City of Coldwater Davison Community Schools City of Davison

Coldwater Fremont Street School Davison Community Schools - Collins Field Renovations

Install geothermal heating and cooling system; replace existing windows; increase electrical service capacity, building remodeling to accomodate geothermal; asbestos abatement; remodel existing classrooms. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009 Within 90 days Masonry repairs after approval Renovation of football stadium including fencing, track, bleacher upgraddes, concessions renovations None Set

Saugatuck Public Schools

Saugatuck Public Schools Transportation Garage

Exisitng bus garage is circa 1930, funds would be used to build facility that would be used for mechanical repairs and maintenance for districts transportation fleet. 6/1/2009

October, 2009

$

418,600

LCS/Turrill Elem.

City of Douglas

A T

s

PP

O N

Grand Haven Area Public Schools

City of Grand Haven

Grand Haven Area Public Schools - White Pines Middle School

Construction of a multi-purpose room at White Pines Middle School would consist of filling in an existing closed pool with sand, cap the opening with a concrete sub floor, install a multi-purpose rubber floor surfacing material. Install 6 basketball backboards/frames, install volleyball stansions and game lines. The renovation shall also include new energy efficient lighting, doors and frames, paint, upgrading the electrical and HVAC systems, and renovation of an existing vestibule for a community entrance. The existing area has showers and restroom facilities in place. June, 2009

Leslie Public Schools

City of Leslie

Leslie Public Schools Leslie Middle School

Energy Efficiency Upgrades - replace remaining ballasts to T8

3/30/2009

4/30/2009

$

2,700

Leslie Public Schools

City of Leslie

Leslie Public Schools Leslie Middle School

Energy Efficiency Upgrades - gym light replacement at Middle School

3/30/2009

4/30/2009

$

4,500

Leslie Public Schools

City of Leslie

Leslie Public Schools FLC building

Connect Jean Ekins FLC to network via wireless

3/30/2009

4/30/2009

$

2,000

Leslie Public Schools

City of Leslie

Leslie Public Schools Bus Garage

Wireless Network Connection to Bus Garage

3/30/2009

4/30/2009

$

2,000

Leslie Public Schools

City of Leslie

Leslie Public Schools Leslie High School

Wireless connection for student use in Commons

3/30/2009

4/30/2009

$

12,000

Leslie Public Schools

City of Leslie

Leslie Public Schools district - wide

Staff/Teacher computer replacement

3/30/2009

4/30/2009

$

25,000

Leslie Public Schools

City of Leslie

Leslie Public Schools district - wide

New Network Switches

3/30/2009

4/30/2009

$

40,000

Leslie Public Schools

City of Leslie

Leslie Public Schools Leslie High School

Upgrade/replace Computer Labs

3/30/2009

4/30/2009

$

50,000

Leslie Public Schools

City of Leslie

Leslie Public Schools district - wide

Major Roofing Repairs District Wide

6/14/2009

7/14/2009

$

100,000

Leslie Public Schools

City of Leslie

Leslie Public Schools Bus Garage

Major Asphalt Replacement at our Bus Garage

6/14/2009

7/1/2009

$

110,000

Leslie Public Schools

City of Leslie

6/14/2009

8/30/2009

$

1,500,000

Newaygo County Resa City of Newaygo

Leslie Public Schools Woodworth Elementary Major Parking Lot Work to improve student safety at Elementary School HVAC Systems Renovation - to include geothermal installation and energy NC RESA Neway Center management control

5/1/2009

$

1,332,800

Newaygo County Resa City of Newaygo

NC RESA Neway Center

5/1/2009

$

380,800

ub

S

02262009

tt i m

d e t

t s e

qu

e R

Repair/replace electrical wiring & lighting systems

Submitted Requests - Not Approved

Route (Infrastructure Only)

483 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Oakland Schools Clarkston Swartz Creek Community Schools Clayton Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Chippewa Valley Schools Clinton Township Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp Clintondale Community Schools Clinton twp

Project Description

Start Date

Oakland Schools-Tech Campus NW

Upgrades to a career and technical education facility replacing bldg infrastructure, lighting, plumbing, security, electrical, HVAC and upgrading labs. Extend water and sewer to building.

5/1/2009

9/1/2010

Swartz Creek Community Schools

Upgrading HVAC Dieck Elemnetary

6/1/2009

9/1/2009

Chippewa Valley - Mohegan High School

Upgrade lighting (LED, O.S.)

9/1/2009

8/1/2010

Chippewa Valley - Administration Building

Upgrade lighting (T8, LED, O.S.)

9/1/2009

8/1/2010

Chippewa Valley - Clinton Valley Elem

Upgrade lighting (T8, T5, LED, O.S.)

9/1/2009

Chippewa Valley - CVHS 9th Grade Center

Upgrade lighting (T8, T5, LED, O.S.)

Chippewa Valley - Erie Elementary

Upgrade lighting (T8, LED, O.S.)

Chippewa Valley - Chippewa Valley High

Replace auditorium lights

Chippewa Valley - Cherokee Elementary

Upgrade lighting (T8, T5, LED, O.S.)

Chippewa Valley - Chippewa Valley High

Upgrade lighting (T8, T5, O.S.)

Chippewa Valley - Cherokee Elementary

Repave parking lot

Chippewa Valley - Wyandot Middle School

Repave parking lot

Chippewa Valley - Ottawa Elementary

Replace roof

Chippewa Valley - Chippewa Valley High

Replace portion of roof

s t s

e u

q e R

D VE $

16,875

$

123,438

$

191,563

8/1/2010

$

205,625

9/1/2009

8/1/2010

$

248,000

9/1/2009

8/1/2010

$

312,500

9/1/2009

8/1/2010

$

354,188

9/1/2009

8/1/2010

$

1,275,000

9/1/2009

8/1/2010

$

103,125

9/1/2009

8/1/2010

$

187,500

9/1/2009

8/1/2010

$

632,670

9/1/2009

8/1/2010

$

1,235,640

9/1/2009

8/1/2010

$

1,407,705

O R 8/1/2010

Replace roof

Clintondale

Add an additional 100 student computer stations to the combined MS/HS libarary

6/15/2009

8/25/2009

$

120,000

High School & Admin parking lot resurfacing

6/20/2009

8/20/2009

$

200,000

Replace and install all Audio Visual equipment in HS conference center

6/15/2009

8/25/2009

$

41,000

Add 1 MS Computer lab, 36 computers, to support MS Math improvement

6/15/2009

8/25/2009

$

89,000

Add 2 HS Computer labs, 75 computers, to support HS Math improvement

6/15/2009

8/25/2009

$

89,250

Clintondale

Asbestos floor tile removal & replacement at Price drive

6/20/2009

8/20/2009

$

150,000

Clintondale

Wireless connection to all 6 Clintondale Buildings (Admin, HS, MS & 3 Els)

6/15/2009

8/25/2009

$

175,000

Clintondale

I Elmo, projector and smartboard for each classroom (225)

6/15/2009

8/25/2009

$

295,000

Clintondale

Asbestos floor tile removal & replacement middle school

6/20/2009

8/20/2009

$

300,000

Clintondale

High School & Pool Roof

6/20/2009

8/20/2009

$

320,000

Clintondale

tt i m

Clintondale Clintondale

ub

d e t

Submitted Requests - Not Approved

Route (Infrastructure Only)

7,000,000 2,000,000

P P A

-N

$ $

9/1/2009

T O

Funding Request

Chippewa Valley - Algonquin Middle School

Clintondale

S

02262009

Project Name

Expected Completion Date

484 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Gratiot-Isabella Resd

Branch ISD

Coe Township

Coldwater

Branch ISD Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools

Project Name

Project Description

$

2,300,000

Branch ISD- Lakeland Head Start Facility

The existing wood T-11 exterior siding,including the skirting, on the two classroom modular building is extremely rotten and in need of replacement. Because of the way it was constructed, the exterior handicapped accessible ramp will have to be removed 60 days from and replaced after the removal and reinstallation of exterior siding. The present wood 90 days from commencement of siding is original to the building in 1994. approval of funds construction $

25,000

Coldwater

Coldwater Jefferson Elementary

Coldwater

Coldwater Fremont Street School

Coldwater

Coldwater Lincoln Elementary

Coldwater

Coldwater Fremont Street School

Coldwater

Coldwater Jefferson Elementary

Coldwater

Coldwater Legg Middle School

Coldwater Coldwater

m b u

Coldwater Lincoln Elementary

Coldwater Fremont Street School Coldwater Legg Middle School Coldwater Max Larsen

Coldwater

Coldwater High School

Coldwater

Coldwater Legg Middle School

Coldwater

Coldwater Jefferson Elementary

02262009

O R

A T

s

PP

The existing exterior entrance ramp to the Branch ISD Early Education Offices (Head Start, Great Start School Readiness, & other programs) is in very poor condition and does not meet ADA accessibility requirements. The existing concrete surface ramp with steel piping rails would be completely removed and a new ramp in full compliance of all accessibility requirements would be installed. This is the only accessible entrance to the main floor of the building and is used by parents, staff, and other 90 days from members of the public to enter the building approval of funds Within 90 days Provide control system for domestic hot water pumps automatic operation from approval Within 90 days Recommission heating, ventilation, and hot water systems from approval Within 90 days Recommission hot water, heating, and ventilation systems from approval Within 90 days Replace sinks with enegy efficient sinks and fixtures from approval Within 90 days Recommission heating, ventilation, and hot water systems from approval Within 90 days Replace 65 wall mounted thermostats from approval Replace heating hot water pump number 2 and provide control system for domestic Within 90 days hot water pumps automatic operation from approval Within 90 days Replace original exterior doors from approval Within 90 days Replace 21 sinks, fixtures, and urinals with energy efficient from approval Within 90 days Provide heating hot water non-chemical filtration system from approval Within 90 days Provide heating hot water non-chemical filtration system from approval Within 90 days Provide heating hot water non-chemical filtration system from approval Within 90 days Provide heating hot water non-chemical filtration system from approval

e u

st

eq

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

9/1/2010

O N

R d

e t t

it

S

Funding Request

District = Gratiot-Isabella RESD; Facility = Winding Brook Conference Centre

Branch ISD- Early Education Offices

Coldwater

Start Date

Expansion and renovation of a facility that is used primarily for teacher and administrator training, educational and professional development, and as a professional conference center. Expansion of main conference room will allow maximum capacity of 300 attendees. Technology equipment enhancements will allow two way communication between multiple sites, and two way communication between rooms at the conference center. Energy and utility renovations will improve energy efficiency of building, using various "green" technology improvements including natura lighting, solar power, and complete replacement of heating, ventilation, and air conditioning systems with more cost and energy efficient equipment and technologies Improvements are also planned for insulation and window replacement, increasing the energy efficiency of the facility. Renovation will also consolidate special education June 1 if funds professional staff into a single location as opposed to multiple sites within a two countyare made area. available

Coldwater

Coldwater

Expected Completion Date

60 days from commencement of construction $

35,820

60 days after start

$

6,000

30 days after start

$

9,600

30 days after start

$

9,600

60 days after start

$

12,000

30 days after start

$

14,000

90 days after start

$

18,000

60 days after start

$

18,000

60 days after start

$

19,200

90 days after start

$

21,600

60 days after start

$

22,000

60 days after start

$

22,000

60 days after start

$

22,000

60 days after start

$

24,000

485 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools

Location City or Township

Project Description

Coldwater

Coldwater Lincon Elementary

Provide heating hot water non-chemical filtration system

Coldwater

Coldwater Fremont Street School

Replace 14 water closets and plumbing with energy efficient closets

Coldwater

Coldwater Legg Middle School

Recommission heating, ventilating, and hot water systems

Coldwater

Coldwater Fremont Street School

Replace 150 lighting fixtures with electronic ballasts and T8 lamps

Coldwater

Coldwater Lincoln Elementary

Replace original exterior doors

Coldwater

Coldwater Lincoln Elementary

Replace 24 sinks and plumbing with energy efficient fixturers

Coldwater

Coldwater Legg Middle School

Replace 21 water closets with energy efficient closets

Coldwater

Coldwater High School

Recommission heating,ventilating,and hot waer systems

Coldwater

Coldwater Lincoln Elementary

Replace 24 water closets with high efficiency closets

Coldwater

Coldwater Legg Middle School

Replace original exterior doors

Coldwater

Coldwater High School

Replace original exterior doors

Coldwater

Coldwater Jefferson Elementary

Provide Variable Frequency Drive and controller for boiler heating hot water pumps

Coldwater

Coldwater Lincoln Elementary

Provide Variable Frequency Drive and controller for boiler heating hot water pumps

Coldwater

Coldwater High School

Provide Variable Frequency Drive and controller for boiler heating hot water pumps

Coldwater

Coldwater Legg Middle School

Provide Variable Frequency Drive and controller for boiler hot water pumps

Coldwater

Coldwater Lincoln Elementary

Replace roof

Coldwater

Coldwater Lincoln Elementary

Coldwater

Coldwater Legg Middle School

Coldwater

Coldwater High School

Coldwater Coldwater Coldwater

u S

eq

Masonry repairs

Coldwater Legg Middle School

Masonry repairs

Coldwater Lincoln Elementary Coldwater High School Coldwater Legg Middle School

Coldwater Legg Middle School

Coldwater

Coldwater High School

O N

Replace 1,500 lighting fixtures with electronic ballasts and T8 lamps

Replace original boilers

bm

A T

Masonry repairs

Coldwater Legg Middle School

Coldwater

02262009

e u

st

s

Start Date Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days from approval Within 90 days after approval Within 90 days after approval Within 90 days from approval Within 90 days after approval

PP

Within one year from approval date Within 90 days after approval

Within one year from approval Modifications to building for barrier free accessability date Within 90 days Replace outside lighting after approval Replace 14 severly corroded heating and ventilating units from original installation of Within 90 days 1966 that have reached their useful life from approval Within 90 days Replace roof after approval Within 90 days Replace roof after approval

Submitted Requests - Not Approved

Funding Request

60 days after start

$

24,000

60 days after start

$

27,500

30 days after start

$

27,600

90 days after start

$

36,000

60 days after start

$

36,000

90 days after start

$

37,400

90 days after start

$

37,800

30 days after start

$

42,000

90 days after start

$

43,700

60 days after start

$

60,000

60 days after start

$

78,000

60 days after start

$

84,000

90 days after start

$

84,000

90 days after start

$

84,000

90 days after start

$

84,000

60 days after start

$

159,600

60 days after start 180 days after start

$

168,000

$

270,000

60 days after start

$

282,000

120 days after start

$

372,000

60 days after start

$

450,000

90 days after start

$

462,000

90 days after start 120 days after start

$

492,000

$

600,000

60 days after start

$

762,000

60 days after start

$

1,368,000

O R

R d

e t t

it

Coldwater Community Schools Coldwater Coldwater Community Schools Coldwater Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools

Project Name

Expected Completion Date

D VE

Route (Infrastructure Only)

486 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Colon Community School District

erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping the Colon school building; acquiring and installing educational technology improvements and developing and improving playgrounds and sites?

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Operations

Install new waste oil furnace to reduce energy costs

6/1/2009

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Northern High

Replace deteriorated entrance carpeting

6/1/2009

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Western High

Replace deteriorated locker room floors

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Central High

Replace deteriorated corridor carpeting

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Glengary El

Replace deteriorated classroom doors

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Central High

Redesign parking lot for improved pedestrian safety

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Smart Middle

Reconstruct deteriorated parking lots

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Western High

Replace deteriorated parking lots and loading dock

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Western High

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Central High

Walled Lake Consolidated Schools Commerce Twp.

Walled Lake - Northern High

Comstock Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools

Expand the district's building operating system to control lighting, air handling units, blowers, pumps and other facility items that use electricity. This would allow the Comstock Public Schools - All building district to save electricity. Comstock Park Public Schools (CPPS) Install software to improve overall energy efficiency and management of building Stoney Creek Elementary heating and cooling. Comstock Park Public Schools (CPPS) Install software to improve overall energy efficiency and management of building Greenridge Elementary heating and cooling. Comstock Park Public Schools (CPPS) - Pine Install software to improve overall energy efficiency and management of building Island Elementary heating and cooling. Comstock Park Public Schools (CPPS) - Mill Install software to improve overall energy efficiency and management of building Creek Middle School heating and cooling. Comstock Park Public Schools (CPPS) North Kent High School Replacement of old windows with high efficiency windows. Comstock Park Public Schools (CPPS) - High Install software to improve overall energy efficiency and management of building School heating and cooling.

Colon Community School District

Colon

Comstock

itt

d e t

Comstock Park, MI

S

Comstock Park, MI Comstock Park, MI Comstock Park, MI

Comstock Park, MI

Comstock Park Public Schools Comstock Park, MI

02262009

Funding Request

$

22,045,000

$

50,000

$

25,000

8/31/2009

$

100,000

6/1/2009

8/31/2009

$

150,000

6/1/2009

8/31/2009

$

200,000

6/1/2009

8/31/2009

$

250,000

6/1/2009

8/31/2009

$

500,000

6/1/2009

8/31/2009

$

700,000

Install security and surveillance systems

6/1/2009

8/31/2009

$

500,000

Install security and surveillance systems

6/1/2009

8/31/2009

$

500,000

Install security and surveillance systems

6/1/2009

8/31/2009

$

500,000

9/1/2001

9/1/2010

$

5,000,000

June of 2009

8/1/2009

$

12,031

June of 2009

8/1/2009

$

12,474

June of 2009

8/1/2009

$

18,349

June of 2009

8/1/2009

$

18,983

June of 2009

8/1/2009

$

24,000

June of 2009

8/1/2009

$

36,684

June of 2009

8/1/2009

$

40,000

s t s

T O

-N

e u

q e R

Comstock Park Public Schools (CPPS) - High District data center improvements including hardware reconfiguration, improved School electrical systems, battery backup device, and fire suppression system.

Submitted Requests - Not Approved

8/31/2009

O R

P P A 6/1/2009

m b u

Comstock Park, MI

Expected Completion Date

8/31/2009

D VE

Route (Infrastructure Only)

487 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Park Public Schools Comstock Public Schools Comstock Public Schools Comstock Public Schools Comstock Public Schools Comstock Public Schools

Location City or Township Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI Comstock Park, MI

Project Name Comstock Park Public Schools (CPPS) - Mill Creek Middle School Comstock Park Public Schools (CPPS) - High School Comstock Park Public Schools (CPPS) North Kent High School Comstock Park Public Schools (CPPS) Greenridge Elementary Comstock Park Public Schools (CPPS) - High School Comstock Park Public Schools (CPPS) Stoney Creek Elementary Comstock Park Public Schools (CPPS) - Pine Island Elementary Comstock Park Public Schools (CPPS) North Kent High School Comstock Park Public Schools (CPPS) - Mill Creek Middle School Comstock Park Public Schools (CPPS) - Pine Island Elementary Comstock Park Public Schools (CPPS) Stoney Creek Elementary Comstock Park Public Schools (CPPS) - High School Comstock Park Public Schools (CPPS) Transportation Garage Comstock Park Public Schools (CPPS) Greenridge Elementary Comstock Park Public Schools (CPPS) - Mill Creek Middle School Comstock Park Public Schools (CPPS) - Mill Creek Middle School Comstock Park Public Schools (CPPS) Stoney Creek Elementary Comstock Park Public Schools (CPPS) - High School Comstock Park Public Schools (CPPS) - Pine Island Elementary Comstock Park Public Schools (CPPS) - High School

June of 2009

8/1/2009

$

60,000

June of 2009

8/1/2009

$

160,000

Cabling and equipment upgrades.

June of 2009

8/1/2009

$

3,000

Cabling and equipment upgrades.

June of 2009

8/1/2009

$

5,000

Install two new in-duct heaters to replace obsolete and no longer available units.

June of 2009

$

13,440

Cabling and equipment upgrades.

June of 2009

$

15,000

Cabling and equipment upgrades. Classroom technology upgrades including ceiling mounted projectors, document cameras, interactive whiteboards, and computers.

PP

8/1/2009

June of 2009

8/1/2009

$

20,000

June of 2009

8/1/2009

$

20,000

Cabling and equipment upgrades.

June of 2009

8/1/2009

$

30,000

June of 2009

8/1/2009

$

35,000

Replacement of current damaged roofing membrane with new pitched roof.

June of 2009

8/1/2009

$

40,000

Cabling and equipment upgrades.

June of 2009

8/1/2009

$

50,000

June of 2009

8/1/2009

$

50,000

June of 2009

8/1/2009

$

54,000

June of 2009

8/1/2009

$

61,400

June of 2009

8/1/2009

$

65,000

June of 2009

8/1/2009

$

72,000

June of 2009

8/1/2009

$

78,000

June of 2009

8/1/2009

$

93,000

June of 2009

st

s

A T

O N

Remodel and expansion of existing parking lot. Classroom technology upgrades including ceiling mounted projectors, document cameras, interactive whiteboards, and computers. Install rooftop air conditioning units, piping, electrical work, temperature controls and steel structural supports. Classroom technology upgrades including ceiling mounted projectors, document cameras, interactive whiteboards, and computers. Classroom technology upgrades including ceiling mounted projectors, document cameras, interactive whiteboards, and computers. Classroom technology upgrades including ceiling mounted projectors, document cameras, interactive whiteboards, and computers. Classroom technology upgrades including ceiling mounted projectors, document cameras, interactive whiteboards, and computers. Install rooftop air conditioning units, piping, electrical work, temperature controls and steel structural supports.

e u

eq

R d

e t t

it

Project Description Replacement of old boilers with new high efficiency models and installation of improvements. Replacement of old boilers with new high efficiency models and installation of improvements.

Replace Rotary Chiller Compression system.

Start Date

Expected Completion Date

O R 8/1/2009

Funding Request

D VE

8/1/2009

$

137,400

Comstock Public Schools - East Elementary

Remodel and replace the electrical system to install a high efficiency electrical service. In addition to the electrial service replacement, we would install solar panels and wind turbines. 9/1/2001

9/1/2010

$

3,000,000

Comstock Public Schools - Green Meadow Elementary

Remodel and replace the electrical system to install a high efficiency electrical service. In addition to the electrial service replacement, we would install solar panels and wind turbines. 9/1/2001

9/1/2010

$

3,000,000

Comstock Township

Remodel and replace the electrical system to install a high efficiency electrical service. In addition to the electrial service replacement, we would install solar panels Comstock Public Schools - North Elementary and wind turbines. 9/1/2001

9/1/2010

$

3,000,000

Comstock Township

Comstock Public Schools - North East Elementary

Remodel and replace the electrical system to install a high efficiency electrical service. In addition to the electrial service replacement, we would install solar panels and wind turbines. 9/1/2001

9/1/2010

$

5,000,000

Comstock Public Schools - High School

Remodel and replace the electrical system to install a high efficiency electrical service. In addition to the electrial service replacement, we would install solar panels and wind turbines. 9/1/2001

9/1/2010

$

6,000,000

Comstock Township

u S

Comstock Township

Comstock Township

02262009

bm

Submitted Requests - Not Approved

Route (Infrastructure Only)

488 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Constantine Public School District Constantine Public School District Constantine Public School District Constantine Public School District Constantine Public School District

Constantine Public School District Constantine Public School District Constantine Public School District Constantine Public School District Constantine Public School District

Constantine Constantine Constantine

Start Date

Constantine Public Schools Windows/Doors at The windows and doors at the Middle School are old and drafty. New energy efficient MS windows and doors would greatly reduce energy bills and increase energy efficiency. 6/1/2009 Replacing 50 year-old pipes that are constantly breaking and leaking. This will lead to Constantine Public Schools Pipe Replacement a reduction in our water usage/bills for the District 6/1/2009

Constantine Constantine

6/30/2009 6/30/2009

$

D VE

20,000

$

50,000

$

50,000

8/15/2009

$

150,000

7/15/2009

$

15,000

O R 7/30/2009

Constantine

6/30/2009

$

30,000

Constantine

Our middle school locker room is seriously overcrowded and needs to be expanded. We plan on using part of a stage area as additional space for our middle school locker room. The work would be done by our staff. 6/1/2009

8/15/2009

$

50,000

The Canaris Building is a 100 year-old building that is no longer used by the District. The money would be used to raze the building and create parking space and/or a space for an alternative education building. 6/1/2009

7/1/2009

$

100,000

Replace current server system with 3 Virtual Servers

8/30/2009

$

110,000

12/31/2009

$

13,225,000

12/31/2009

$

1,430,000

8/20/2011

$

17,000,000

$

15,400,000

Constantine

Constantine Public Schools Locker Room Renovation Constantine Public Schools Demolition of Canaris Building Constantine Public Schools Update Server System

Constantine Constantine

d e tt

t i m

Croswell-Lexington

ub

Croswell

Crystal Township

Croswell-Lexington Community Schools Carson City-Crystal Area Schools, Crystal Elementary Carson City-Crystal Area Schools, Crystal Elementary

Custer

Mason County Eastern Schools

Custer Dansville

Mason County Eastern Schools Dansville

S

Crystal Township

s t s

-N

e u

6/1/2009

Entry and Prinicipal Office Complex; Renovation of three existing science rooms; addition of 1 science rooms; Renovation of Cafeteria/Commons Area; Remodel Auditorium; New Community Gymnasium; New Music room; New Green House; Addition of 6 classrooms for Special Education, Math and Technology Smart Lab, and Athletic Complex and Pool Area and JROTC renovation; 7/1/2008 Central Office Renovation; Addition of a Youth After-School Center; Renovation of Elementary Bathrooms 4/1/2009

q e R

Covert Public Schools - Covert High School Covert Public Schools - Covert Elementary and District

Croswell

02262009

T O

Bond project that includes construction of new high school classrooms, renovations of existing classrooms, new high school cafeteria and gymnasium, renovation of all district restrooms for ADA compliance, improvements in lighting and windows for energy efficiency in all district buildings, and technology infrastructure to include wireless internet access and security systems in all buildings, and fire alarm system at middle school 9/1/2009 erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping the Colon school building; acquiring and installing educational technology improvements and developing and improving playgrounds and sites?

Replace existing single pane windows and glass outside walls.

July, 2009

Nov., 2009

$

80,000

Replace existing 25 year old roof.

July, 2009

Nov., 2009

$

225,000

Repair/Replacement of main roof section on Mason County Eastern High School Repair/Replacement of the cafeteria floor for the K-12 program located at Mason County Eastern Elementary School Building renovation of our elementary and high schoo

6/29/2009

8/28/2009

$

350,000

6/29/2009 11/1/2009

8/28/2009 6/1/2011

$ $

150,000 2,500,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

15,000

$

8/15/2009

P P A

Funding Request

Currently, traffic backs up on US-131 due having only one entry/exit into the building. The plan would be to continue the current blacktop to the back of the elementary to Constantine Public Schools Entry/Exit Traffic create an entry/exit to another road on the backside of the building to eliminate traffic Addition back-up on US-131. This is a safety issue for students and parents. 6/1/2009 Constantine Public Schools Partial Roof This is the final section of roofing within the District that needs to be replaced - 25 Replacement years-old 6/1/2009

Covert Public Schools Covert

Croswell-Lexington Community Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Mason County Eastern Schools Mason County Eastern Schools Dansville Schools

Project Description

This loop will enable to air condition the high school buildings in sections - currently if the air condition is on - the entire building is air conditioned causing high energy bills and waste 6/1/2009 Removal of asbestos from 100 year-old Canaris Building so that building is asbestos free and ready for demolition 6/1/2009 The Octagon is a separate building used by Riverside Elementary for Music and Art. It is in need of repairs - heating/cooling and interior work 6/1/2009

Constantine Public Schools Chiller Loop Constantine Public Schools Asbestos Removal Constantine Public Schools Octagon Renovation

Covert Public Schools Covert

Croswell-Lexington Community Schools

Project Name

Expected Completion Date

489 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools

Dearborn Heights School District #7

Location City or Township Davison Davison Davison Township Davison Township Davison Township Davison Township Davison Township

Project Name Davison Community Schools - Central Elementary School Davison Community Schools - Central Elementary School Davison Community Schools - Gates Elementary School Davison Community Schools - Davison High School Davison Community Schools - Davison High School Davison Community Schools - Transportation Department

Davison Township

Davison Community Schools - All Buildings Davison Community Schools - Davison High School Davison Community Schools - Gates Elementary School

Davison Township

Project Description

Funding Request

Kitchen and Cafeteria Renovations

None Set

None Set

$

284,500

Classroom renovations including ceilings, flooring, cabinetry

None Set

None Set

$

937,500

Parking Lot Expansion and related Drainage

None Set

None Set

$

300,000

Main Office Renovations

None Set

None Set

$

341,500

$

858,000

None Set

$

1,240,000

None Set

$

1,650,000

None Set

None Set

$

1,875,000

Gymnasium bleacher replacement None Set Construction of new transportation facility inclduing bus parking, driver lounge, offices, wash bay None Set Electrical upgrades and low voltage wiring and related network infrastructure renovations None Set

A T

Construction of new auxiliary gymnasium

PP

O R None Set

D VE

None Set

None Set

$

1,920,000

Crestwood School District

Erecting, furnishing and equipping additions to, and remodleing, furnishing and refurnishing, equipping and re-equipping the elementary schools; acquiring, installing and equipping technology for the elementary schools; and developing and improving sites? 6/1/2009

8/15/2011

$

21,435,000

Dearborh Heights

Westwood Community Schools

Erecting, furnishing and equipping a new elementary, a new middle school and additions to the high school; remodeling, refurnishing and re-equipping existing school buildings, including educational technology improvements; purchasing land and developing and improving sites, playgrounds, playfields, athletic and outdoor physical education facilities. The following is for informational purposes only: The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated millage that will be levied for the proposed bonds in the year 2002 is 8.70 mills ($8.70 on each $1,000 of taxable valuation). The estimated simple average annual millage anticipated to be required to retire this bond debt is 8.67 mills ($8.67 on each $1,000 of taxable valuation). 6/1/2009

8/15/2012

$

44,700,000

Dearborn Heights

Crestwood, Hillcrest Elementary

Domestic water piping replacement

6/1/2009

8/30/2009

$

131,000

Dearborn Heights

Crestwood, Kinloch Elementary

Domestic water piping replacement

6/1/2009

8/30/2009

$

150,000

Dearborn Heights

Crestwood, Highview Elementary

Domestic water piping replacement

6/1/2009

8/30/2009

$

175,000

Dearborn Heights

Crestwood, Kinloch Elementary

Replace exterior doors and windows with high efficiency models.

6/1/2009

8/30/2009

$

200,000

Crestwood, Hillcrest Elementary

Replace exterior doors and windows with high efficiency models.

6/1/2009

8/30/2009

$

330,000

Crestwood, Highview Elementary

Replace exterior doors and windows with high efficiency models.

6/1/2009

8/30/2009

$

400,000

Crestwood, Crestwood High School

Replace exterior doors, windows, walls with high efficiency models.

6/1/2009

8/30/2010

$

825,000

Dearborn Heights

Crestwood, Kinloch Elementary

H & V unit ventilator replacement, AC addition

6/1/2009

8/30/2009

$

850,000

Dearborn Heights

Crestwood, Hillcrest Elementary

H & V unit ventilator replacement, AC addition

6/1/2009

8/30/2009

$

926,000

Dearborn Heights

Crestwood, Highview Elementary

H & V unit ventilator replacement, AC addition

6/1/2009

8/30/2009

$

1,115,000

Dearborn Heights

Crestwood, Riverside Middle School

Domestic water piping replacement

6/1/2009

8/30/2009

$

1,300,000

Dearborh Heights

Construction of new multi-purpose room/cafeteria with kitchen and storage

s

t s e

Dearborn Heights School District #7 Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District

Start Date

Expected Completion Date

Dearborn Heights

S

Dearborn Heights

02262009

u q e

R d

e t tt

i m

ub

Dearborn Heights

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

490 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District Crestwood School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Dearborn Heights

Crestwood, Riverside Middle School

Replace exterior doors, windows, walls with high efficiency models.

6/1/2009

8/30/2010

$

2,100,000

Dearborn Heights

Crestwood, Crestwood High School

H & V unit ventilator replacement, AC addition

6/1/2009

12/31/2009

$

2,230,000

Dearborn Heights

Crestwood, Riverside Middle School

H & V unit ventilator replacement, AC addition

6/1/2009

8/30/2009

$

2,350,000

Dearborn Heights

Crestwood, Hillcrest Elementary

Security system installed

6/1/2009

8/30/2009

$

25,000

Dearborn Heights

Crestwood, Highview Elementary

Security system installed

6/1/2009

$

40,000

Dearborn Heights

Crestwood, Kinloch Elementary

Security system installed

6/1/2009

8/30/2009

$

40,000

Dearborn Heights

Crestwood, Riverside Middle School

Security system installed

6/1/2009

8/30/2009

$

85,000

Dearborn Heights

Crestwood, Crestwood High School

Security system installed

6/1/2009

8/30/2009

$

85,000

Dearborn Heights

Crestwood, Hillcrest Elementary

Perimeter building grade improvements, pavement repairs, and parking lot expansion 6/1/2009

12/1/2009

$

95,000

Dearborn Heights

Crestwood, Highview Elementary

Fire alarm system replacement

6/1/2009

8/30/2009

$

100,000

Dearborn Heights

Crestwood, Hillcrest Elementary

Fire alarm system replacement

6/1/2009

8/30/2009

$

100,000

Dearborn Heights

Crestwood, Kinloch Elementary

Fire alarm system replacement

6/1/2009

8/30/2009

$

100,000

Dearborn Heights

Crestwood, Crestwood High School

Site Improvements

6/1/2009

8/30/2010

$

185,000

Dearborn Heights

Crestwood, Kinloch Elementary

Perimeter building grade improvements, pavement repairs, and parking lot expansion 6/1/2009

12/1/2009

$

195,000

Dearborn Heights

Crestwood, Highview Elementary

Perimeter building grade improvements, pavement repairs, and parking lot expansion 6/1/2009

12/1/2009

$

217,000

Dearborn Heights

Crestwood, Riverside Middle School

Pavement and sidewalk repairs, new bus drive and parking lot expansion

6/1/2009

12/1/2009

$

225,000

Dearborn Heights

Crestwood, Riverside Middle School

Fire alarm system replacement

6/1/2009

8/30/2009

$

325,000

Dearborn Heights

Crestwood, Crestwood High School

Fire alarm system replacement

6/1/2009

8/30/2009

$

375,000

Dearborn Heights

Crestwood, Crestwood High School

Perimeter building grade improvements, pavement repairs, and parking lot expansion 6/1/2009

12/1/2009

$

525,000

Dearborn Heights

Crestwood, Hillcrest Elementary

New Art & Music Room, Toilet Rooms

6/1/2009

8/30/2010

$

750,000

Crestwood, Hillcrest Elementary

Gymnasium expansion

6/1/2009

8/30/2010

$

900,000

Crestwood, Kinloch Elementary

Classroom, Toilet, Cafeteria, Gym Upgrades

6/1/2009

8/30/2010

$

2,225,000

Crestwood, Highview Elementary

Classroom, Toilet, Cafeteria, Upgrades

6/1/2009

8/30/2010

$

2,565,000

Crestwood, Kinloch Elementary

New Cafeteria, Kitchen Addition, Gym Addition

6/1/2009

8/30/2010

$

2,800,000

Dearborn Heights

Crestwood, Highview Elementary

Two story classroom wing addition

6/1/2009

8/30/2010

$

3,125,000

Dearborn Heights

Crestwood, Hillcrest Elementary

Classroom, Toilet, Cafeteria, Gym Upgrades

6/1/2009

8/30/2010

$

3,420,000

Dearborn Heights

Crestwood, Riverside Middle School

New Gym, Fitness, Locker Room, Auditorium Additions

6/1/2009

8/30/2010

$

4,650,000

m b u

Dearborn Heights Dearborn Heights

S

Dearborn Heights Dearborn Heights

02262009

O N

R d

e t t

it

s

st

e u

eq

A T

Submitted Requests - Not Approved

PP

O R 8/30/2009

D VE

Route (Infrastructure Only)

491 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Crestwood School District Crestwood School District Crestwood School District Crestwood School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Dearborn Heights

Crestwood, Crestwood High School

Additions to Classroom Wing, Media Center, Cafeteria

6/1/2009

12/31/2010

$

6,400,000

Dearborn Heights

Crestwood, Crestwood High School

Classroom, General Building, Toilet, Cafeteria, Gym, Locker Room Upgrades

6/1/2009

8/30/2010

$

6,735,000

Dearborn Heights

Crestwood, Crestwood High School

Athletic Facility improvements

6/1/2009

8/30/2010

$

7,460,000

Dearborn Heights

Crestwood, Riverside Middle School

Classroom, General Building, Toilet, Cafeteria, Gym, Locker Room Upgrades

6/1/2009

8/30/2010

$

9,725,000

Decatur Public Schools - All Holt/Elliot Holt/Sycamore, Midway Holt/Hope

Needed renovations and upgrades for basic infrastructure for the High School built in 1962 and the Davis Elementary oldest wing built in 1952 to include energy efficient heating/AC; replacement of single pane windows; lighting upgrades for energy efficiency; plumbing replacement; handicapped accessibility. Upgrade of High School Science classroom. In addition the Athletic facilities need renovations and upgrades to meet safety and security needs, including locker rooms, gymnasium, and stadium with the addition of a multi purpose room. Technology upgrades for the 21st century. Bus Garage area renovation. Raze a building built in the early 1900's no longer in use and deteriorating. 6/1/2009 New Boilers. Convert from steam to hot water. 6/1/2012 New Boilers for 2 elementaries. Convert from steam to hot water. 6/10/2009 Replace unit ventilators in Child Care 6/12/2009

$ $ $ $

9,500,000 500,000 1,000,000 150,000

Waverly Community Schools, High School

Install solar paneling for heating of water to building.

Waverly Community Schools, Middle School

Replace communication system (PA system).

Waverly Community Schools, Middle School

Replace hot water tank

Waverly Middle School

Electrical wiring in ceilings; mount data projectors in ceilings

Decatur Public Schools Decatur Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Waverly Community Schools Delta Township Delton-Kellogg School District Delton

Reese Public Schools Denmark Twp

02262009

-N

D VE

8/1/2010 8/30/2009 8/12/2009 8/12/2009

5/1/2010

8/31/2010

7/1/2009

6/30/2010

$

6,000

7/1/2009

7/31/2009

$

10,000

7/15/2009

8/8/2009

$

15,000

Electrical wiring in ceilings; mount data projectors in ceilings

7/1/2009

7/15/2009

$

20,000

Insulate pipes.

7/1/2009

9/30/2009

$

30,000

Install full-coverage wireless network

7/1/2009

7/31/2009

$

40,000

Repair roof.

7/1/2009

7/31/2009

$

50,000

Install full-coverage wireless network

7/1/2009

7/31/2009

$

80,000

Replace lighting and electrical units in auditorium.

7/1/2009

6/30/2010

$

250,000

Waverly Community Schools, Middle School

Replace HVAC system.

8/31/2009

12/31/2009

$

240,000

Delton Kellogg Middle School Gym Lights

We would like to install energy efficient lights in the MS gym as this is used all of the school day and most evenings for school classes and athletic events. The bulbs are longer lasting, and will use less energy. 7/1/2009

7/30/2009

$

18,000

$

150,000

$

300,000

Waverly High School Waverly Community Schools, Winans Waverly Middle School

d e t

Waverly Community Schools, High School

tt i m

Waverly High School

s t s

e u

q e R

Waverly Community Schools, High School

b u S

Reese Public Schools Denmark Twp

T O

P P A

O R

Reese Public Schools

Roofs, boilers and carpeting at all district buildings. We have older buidlings well maintained but in need of general upkeep.

04/01/2009 all projects could be started as soon 30 days after as 30 days project started

Reese Public Schools

Covered walkway between Elem. And Middle School, Bus Compound to include fueling facilites, renovation of classrooms for techonolgy lab space at all 3 buildings and locker rooms at the middle school

7/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

3-6 months after project started

492 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Detroit City School District Detroit City School District Detroit City School District Detroit City School District Detroit City School District Detroit City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Detroit

Detroit Public Schools

Demolition of 65 vacant buildings

4/1/2009

8/31/2009

$

38,500,000

Detroit

Detroit Public Schools

Energy Efficiency Projects (HVAC, Windows, Roofs) 100 schools

4/1/2009

9/1/2010

$

205,000,000

Detroit

Detroit Public Schools

Demoltion of Replaced Schools

7/1/2009

12/31/2009

$

28,600,000

Detroit

Detroit Public Schools

New Elementary Schools x 8

7/1/2009

12/31/2010

$

144,000,000

Detroit

Detroit Public Schools

New High School x 5

7/1/2009

$

300,000,000

Detroit

Detroit Public Schools

New K-8 School x 16

7/1/2009

12/31/2010

$

368,000,000

Dewitt Public Schools DeWitt

DeWitt Public Schools

HVAC upgrades

7/1/2009

9/30/2009

$

20,000

Dewitt Public Schools DeWitt

DeWitt Public Schools

replace bus fueling system

7/1/2009

8/30/2010

$

40,000

Dewitt Public Schools DeWitt

DeWitt Public Schools – Junior High

replace aging electric transformer

5/1/2009

8/31/2008

$

45,000

Dewitt Public Schools DeWitt

DeWitt Public Schools

replace gym floor

7/1/2009

12/31/2009

$

60,294

Dewitt Public Schools DeWitt

DeWitt Public Schools

connect facility to municipal water supply

7/1/2009

8/30/2010

$

65,000

Dewitt Public Schools DeWitt

Window replacement

7/1/2009

12/31/2009

$

123,080

5/1/2009

9/30/2009

$

200,000

Dewitt Public Schools DeWitt

DeWitt Public Schools DeWitt Public Schools – Central Administration DeWitt Public Schools – Early Childhood Center

install new boiler

7/1/2009

10/31/2009

$

23,825

Dewitt Public Schools DeWitt

DeWitt Public Schools

electrical upgrades

8/30/2009

8/30/2010

$

39,709

Dewitt Public Schools DeWitt

DeWitt Public Schools - Herbison Woods

replace aging doors and windows

7/1/2009

10/31/2009

$

60,887

Dewitt Public Schools DeWitt

DeWitt Public Schools

door and window replacement

8/30/2009

8/30/2010

$

119,479

Dewitt Public Schools DeWitt

DeWitt Public Schools – Junior High

replace roof

7/1/2009

9/30/2009

$

610,108

Dewitt Public Schools DeWitt

DeWitt Public Schools - Herbison Woods

upgrade aging electrical system

9/1/2009

12/31/2009

$

39,709

Dewitt Public Schools DeWitt

DeWitt Public Schools

remove and replace aging fuel system

8/30/2009

12/31/2009

$

40,000

DeWitt Public Schools – Scott

roof replacement

8/30/2009

12/31/2009

$

100,000

DeWitt Public Schools – Junior High

replace aging boiler

8/30/2009

12/31/2009

$

156,716

DeWitt Public Schools

replace district wide lighting with more fuel efficient lighting

8/30/2009

12/31/2010

$

1,090,185

DeWitt Public Schools – all buildings

convert HVAC system to digital controls

7/1/2009

12/31/2009

$

1,264,148

DeWitt Public Schools - Herbison Woods

replace roof

8/30/2009

12/31/2009

$

1,325,277

Dewitt Public Schools DeWitt

DeWitt Public Schools – Junior High

replace bowing wall

6/30/2009

12/31/2009

$

88,000

Dewitt Public Schools DeWitt

DeWitt Public Schools

upgrade clock and bell system

7/1/2009

8/30/2010

$

209,372

Dewitt Public Schools DeWitt

m b u

Dewitt Public Schools DeWitt Dewitt Public Schools DeWitt Dewitt Public Schools DeWitt Dewitt Public Schools DeWitt Dewitt Public Schools DeWitt

02262009

S

s

st

O N

replace 20+ year old boiler with more fuel efficient boiler system

e u

eq

R d

e t t

it

A T

Submitted Requests - Not Approved

PP

O R 12/31/2010

Route (Infrastructure Only)

D VE

493 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Dewitt Public Schools DeWitt

DeWitt Public Schools – all buildings

install strobe warning lights – fire alarm system

6/1/2009

Dewitt Public Schools DeWitt

DeWitt Public Schools

construct new sidewalk and road crossing to improve student safety

7/1/2009

Dewitt Public Schools DeWitt

DeWitt Public Schools

Lockers

8/30/2009

12/31/2009

Dewitt Public Schools DeWitt

DeWitt Public Schools

air conditioning added to classrooms

8/30/2009

8/30/2010

Dewitt Public Schools DeWitt

DeWitt Public Schools – all buildings

install security systems including cameras, alarms and swipe cards

8/1/2009

Dewitt Public Schools DeWitt

DeWitt Public Schools – all buildings

replace aging parking lots and entrance roads

8/1/2009

Kaleva Norman Dickson School District Dickson

Kaleva Norman Dickson, Brethren HS, Brethren MS

Waterproof Sealant to Buildings

Kaleva Norman Dickson School District Dickson

Kaleva Norman Dickson, Brethren HS, Brethren MS

Asphalt Bus Garage Parking Lot

Kaleva Norman Dickson, Norman, Maple Dickson School District Grove

Kaleva Norman Dickson, Brethren HS, Brethren MS, Wellston EL, Kaleva EL

Roof Warranties & Repairs

Kaleva Norman Dickson, Norman, Maple Dickson School District Grove

Kaleva Norman Dickson, Brethren HS, Brethren MS, Wellston EL, Kaleva EL

Seal/Stripe all Parking Lots

Dollar Bay-Tamarack City Area Schools

Dollar Bay

DollarBay-Tamarack city Area Schools

new interior doors

Dollar Bay-Tamarack City Area Schools

Dollar Bay

DollarBay-Tamarack city Area Schools

new windows

Dollar Bay-Tamarack City Area Schools

Dollar Bay

DollarBay-Tamarack city Area Schools

Dollar Bay-Tamarack City Area Schools

Dollar Bay

DollarBay-Tamarack city Area Schools

Dollar Bay-Tamarack City Area Schools

Dollar Bay

Dollar Bay-Tamarack City Area Schools

Dollar Bay

Dollar Bay-Tamarack City Area Schools

Dollar Bay

Dollar Bay-Tamarack City Area Schools

Dollar Bay

Dollar Bay-Tamarack City Area Schools Hopkins Public Schools Dowagiac Union School District

$

60,000

$

100,000

$

215,090

$

250,000

$

200,000

P P A

8/30/2010

$

1,000,000

6/9/2009

10/9/2009

$

30,000

6/9/2009

10/9/2009

$

150,000

6/9/2009

10/9/2009

$

30,000

6/9/2009

10/9/2009

$

50,000

4/1/2009

5/1/2009

$

29,575

6/1/2009

8/1/2009

$

72,000

update temperature controls

6/1/2009

9/1/2009

$

125,000

New roof

2/1/2010

3/1/2011

$

327,600

DollarBay-Tamarack city Area Schools

build new locker room facilities

8/1/2009

1/1/2010

$

6,270,000

DollarBay-Tamarack city Area Schools

install new science lab faucets

6/1/2009

9/1/2009

$

6,000

DollarBay-Tamarack city Area Schools

Keyless Entry at entrances

4/1/2009

5/1/2009

$

9,000

DollarBay-Tamarack city Area Schools

re-finish auditorium floor

6/1/2009

8/1/2009

$

9,750

6/1/2009

8/1/2009

$

24,375

Dorr township

gym acoustics Replace existing equipment to be age appropriate playground equipment and Hopkins Public Schools Sycamore Elementary equipment which can be integrated into phys. Ed. Curriculum.

6/8/2009

8/31/2009

$

125,000

Dowagiac

Dowagiac

ASAP

24 months

$

1,500,000

d e tt

t i m

S

Dollar Bay

02262009

ub

N s

st

e u

q e R

T O

DollarBay-Tamarack city Area Schools

Roof replacements

Submitted Requests - Not Approved

8/31/2008

Funding Request

O R 12/31/2009

D VE

Route (Infrastructure Only)

494 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Dowagiac Union School District Dowagiac Union School District Dowagiac Union School District Dundee Community Schools Dundee Community Schools East Grand Rapids Public Schools East Grand Rapids Public Schools East Grand Rapids Public Schools East Grand Rapids Public Schools East Grand Rapids Public Schools East Jordan Public Schools East Jordan Public Schools East Jordan Public Schools East Jordan Public Schools East Jordan Public Schools East Jordan Public Schools East Jordan Public Schools East Jordan Public Schools East Lansing School District East Lansing School District East Lansing School District East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Dowagiac

Dowagiac

Aux. gym

ASAP

24 months

$

2,500,000

Dowagiac

Dowagiac

Safety upgrades

ASAP

12 months

$

8,000,000

Dowagiac

Dowagiac

ASAP

24 months

$

32,000,000

Dundee

Dundee Community Schools

Interrior remodeling resurface parking lot and correct drainage to funnel to detention drain to correct current flooding issues beneath building structure.

6/15/2009

8/15/2009

$

300,000

Dundee

Dundee Community Schools East Grand Rapids Public Schools: High School & Middle School

update and improve infrasturcture: lighting, heating controls, increase insulation, conservation and explore use of solar energy usage for heating domestic hot water. 7/15/2009 Install geo-thermal heating and cooling system. Outcomes of the systems will reduce greenhouse gases and energy consumption. 6/1/2009

$

900,000

8/1/2009

$

1,100,000

East Grand Rapids Public Schools, All buildings East Grand Rapids Public Schools, All buildings East Grand Rapids Public Schools, All buildings

Replace roofs with higher efficiency roofs: 298,000 sq. ft. of white single ply membrane roofing with an additional of 1 1/2 ridge insulation to reduce greenhouse gases and energy consumption. 6/1/2009 Water conservation: replace 275 toilet and urnial flush values with a 1/2 quart consumtion and double flush systems. Jun-09 Security measures: Install 80 surveillance cameras and infrastructure district wide and 227 secure in place classroom locks. Jun-09

8/1/2009

$

1,639,000

Aug-09

$

151,250

Aug-09

$

244,850

Jun-09

Aug-09

$

990,000

6/30/2009

7/31/2009

$

4,000

6/10/2009

7/15/2009

$

4,000

6/10/2009

7/10/2009

$

6,000

6/10/2009

7/15/2009

$

12,000

6/20/2009

7/30/2009

$

15,000

6/30/2009

7/31/2009

$

2,300

6/10/2009

6/30/2009

$

2,400

East Grand Rapids

East Grand Rapids East Grand Rapids East Grand Rapids

East Grand Rapids East Jordan East Jordan

T O

-N

East Grand Rapids Public Schools, High Replace steam boilers with twenty two 90+% efficient modular package boilers. The School, Middle School & Wealthy Elementary replacement of these boilers would reduce greenhouse gases and energy East Jordan Public Schools-E. J. Middle School Install lawn irrigation at middle school Reduce window opening size and install new energy efficient windows at the bus East Jordan Public Schools-Bus Garage garage East Jordan Public Schools-E.J. Elementary School Replace four older breaker boxes with new energy efficient breaker boxes

s t s

e u

East Jordan East Jordan

P P A

q e R

East Jordan Public Schools-E. J. High School Replace gym lighting with energy efficient flourescent fixtures for PE classes East Jordan Public Schools-E. J. Middle School Replace failing rooftop air conditioning/heating unit with new energy efficient unit

East Jordan East Jordan

O R 12/15/2009

D VE

East Jordan

East Jordan Public Schools-E. J. High School Re-gout boys and girls locker room floors East Jordan Public Schools-E.J. Elementary School Replace selected interior doors

East Jordan

East Jordan Public Schools-E. J. High School Replace lockers in boys locker room

6/15/2009

7/20/2009

$

12,000

East Lansing

East Lansing Public Schools - Towar Site

Renovation of District's maintenance facility

8/1/2009

6/1/2010

$

400,000

East Lansing Public Schools - DPW Site

Construction of a new building for the District's transportation department.

8/1/2009

6/1/2010

$

800,000

East Lansing Public Schools - Admin Site

Renovation of District's administrative building to correct flooding issue

7/1/2009

10/1/2009

$

300,000

East Detroit Public Schools Elm wood

New water heaters

Summer 2009

Fall 2009

$

17,400

East Detroit Public Schools All Schools

Upgrade Computer Equipment

Summer 2009

Fall 2009

$

133,215

Site Improvements

Summer 2009

Fall 2009

$

231,750

Eastpointe

East Detroit Public Schools All Schools East Detroit Public Schools All Schools & Admin

Non-Instructional Technology upgrades

Summer 2009

Fall 2009

$

380,355

Eastpointe

East Detroit Public Schools All Schools

Instructional Technology upgrades

Summer 2009

Fall 2009

$

392,945

ub

East Lansing East Lansing Eastpointe Eastpointe Eastpointe

02262009

tt i m

d e t

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

495 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools

East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools East Detroit Public Schools Adams Township School District Adams Township School District Adams Township School District

Calhoun ISD Yale Public Schools Yale Public Schools Yale Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Eastpointe

East Detroit Public Schools All Schools

Upgrade furniture and equipment

Summer 2009

Fall 2009

$

438,000

Eastpointe

East Detroit Public SchoolsAll Schools

Roof Replacements

Summer 2009

Fall 2009

$

598,000

Eastpointe

East Detroit Public Schools All Schools

Replace Exterior Doors

Summer 2009

Fall 2009

$

59,400

Eastpointe

East Detroit Public Schools Koepsell

Install new furnaces

Summer 2009

Spring 2010

$

240,000

Eastpointe

East Detroit Public Schools All Schools

Electrical Upgrades, lighting, controls, infrastructure,etc.

Summer 2009

$

251,000

Eastpointe

East Detroit Public Schools High School

Upgrade Mechanical and control systems

Summer 2009

$

277,000

Eastpointe

East Detroit Public Schools High School

Remodel Exterior Façade

Summer 2009

Fall 2009

$

285,000

Eastpointe

East Detroit Public Schools All Elem.

Add security vestibules

PP

Fall 2009

Fall 2009

Spring 2010

$

430,000

Eastpointe

East Detroit Public Schools High School

Auto Shop expansion

Fall 2009

Summer 2010

$

450,000

Eastpointe

East Detroit Public Schools

Remodeling, re-equipping, and re-furnishing school buildings, playgrounds and other facilities; preparing, developing and improving sites at school buildings, playgrounds and other facilities; acquiring, installing, equipping and re-equipping school buildings and other facilities for technology systems and equipment and purchasing school buses.

$

23,055,000

Eastpointe

East Detroit Public Schools All Schools

Exterior Masonry Repairs

Eastpointe

East Detroit Public Schools Middle School

Remodel classroom into computer lab

Eastpointe

East Detroit Public Schools Admin

Repave existing parking lot

Eastpointe

East Detroit Public Schools High School

Eastpointe

East Detroit Public Schools All Schools

Eastpointe

East Detroit Public Schools High School

Eastpointe

East Detroit Public Schools Middle School

Emmett Township

Adams H.C. Schools

Emmett Township

Adams H.C. Schools

Emmett Twp Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township

02262009

s

st

O N

Summer 2009

Fall 2009

$

65,000

Summer 2009

Fall 2009

$

85,000

Summer 2009

Fall 2009

$

175,000

Remodel classroom into science lab

Summer 2009

Fall 2009

$

250,000

Replace Interior Doors

Summer 2009

Fall 2009

$

174,000

Remodel Library

Summer 2009

Fall 2009

$

225,000

Addition for classroom, Band and Choir Rooms

Fall 2009

Spring 2010

$

1,051,200

Installation of Electrical metering for campus buildings

n/a

n/a

$

45,000

Temperature Controls for Administration

n/a

n/a

$

130,000

Adams H.C. Schools

Wind Aided power for Campus Facilities

n/a

n/a

$

400,000

Calhoun ISD Developmental Center Building Generator

The Developmental Center of the Calhoun ISD is a buinding for instruction of special education children. The local districts bus students to these building. This project would provide a generator for the building and allow the building to have continuous electrical and heating for the fragile students that are educated there. 3/31/2009

6/30/2009

$

225,000

Yale Public Schools/Farrell

Install 20 room motion sensors to control lighting

6/9/2009

8/3/2010

$

2,000

Yale Public Schools/Farrell Elementary

Automatic flush urinals & stools

6/9/2009

8/26/2010

$

5,000

Yale Public Schools/Farrell Elementary

Water restrictive water softeners

6/11/2009

8/14/2010

$

7,000

tt i m

d e t

b u S

Emmett Township

A T

O R Fall 2009

D VE

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

496 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Emmett/ Emmett Yale Public Schools Township Mason Consolidated Schools (Monroe)

Erie

Project Name

Project Description

Erie

Monroe Public Schools Erie

Energy efficient water heaters

6/16/2009

8/19/2010

$

10,000

Yale Public Schools/Farrell Elementary

Automatic faucets

6/9/2009

8/31/2010

$

14,000

Yale Public Schools/Farrell Elementary

Automatic hand dryers

6/9/2009

8/4/2010

$

20,000

Yale Public Schools/Farrell Elementary

New roofing & insulation

6/9/2009

8/1/2009

$

25,000

Yale Public Schools/Farrell Elementary

Partial replacement of carpeting, VCT, doors in classrooms

6/9/2009

$

35,000

Yale Public Schools/Farrell Elementary

Windows

6/9/2009

8/21/2010

$

150,000

Yale Public Schools/Farrell Elementary

Skylights

6/9/2009

8/16/2010

$

200,000

Yale Public Schools/Farrell Elementary

New (2) classroom addition of 2100 sf for All-Day Kindergarten

6/9/2009

8/1/2010

$

349,410

Yale Public Schools/Farrell Elementary

HVAC - Geothermal

6/9/2009

8/10/2010

$

1,500,000

Mason Consolidated Schools

As a result of the district not receiving the COPS Secure our Schools grant in the summer of 2008, we were not able to finance the installation of a much needed security camera system in our high school.

6/1/2009

8/31/2009

$

18,400

Mason Consolidated Schools

As a result of the building & site needs specified in a June 2007 Projects Study completed by John Kohler, Architect, PC and the fact that the voters in our school district failed to pass a sinking fund levy on two occasions in 2007, we are submitting projects totaling $10,554,565 (original estimate of $9,504,150 adjusted 10% for inflation + $100,000 for lighting to be installed along the driveways and parking lots). There are 8 pages of capital needs such as new windows in high school bldg; for all bldgs, interior & exterior doors, upgrading electrical, upgrade restrooms, repave driveways and parking lots, install sprinkler systems. 6/1/2009

8/31/2009

$

10,554,565

Erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school district buildings, including a new cafeteria\gymnasium facility connecting Central Elementary and Mason Junior High Schools; and developing and improving playgrounds and sites. It is expected that the Bonds will be outstanding for not less than 28 years, exclusive of refunding. The estimated millage rate is 4.98 mills ($4.98 for each $1,000 of valuation) in the first year, 2000, and over the repayment period of the bond issue an estimated simple average annual millage rate of 4.17 mills ($4.17 for each $1,000 of valuation). 6/1/2009

8/15/2011

$

17,480,000

LEED (Leadership in energy and Environmental Design) Certified Project Architect Diekema Hamann Construction Wolgast Corporation New Roof, Decking, and Insulation, New Sewage System and Parking Lot, New Univent Heating System Upgrade Classrooms Infrastructure for Technology Replace 1963 windows and frame work with energy efficient units, Replace all doors and hardware, Replace toliets, sinks and plumbing with water and energy conserving efficient units Removal of two 1963 fuel oil tanks, Redesign traffic routing in front of school for student safety, Remove asbestos based floor tiles and ceiling and replace, Re-configure classrooms for requirements of no no child left behind and the Michigan Merit curriculum, Improve assessibility for students that have disabilities, Replace all lighting with energy efficient efficient units, Install air handlers for indoor air quality and add Air 180 days after Conditioning, New classroom furniture to meet the needs for changes in curriculum notification of Physical Education gymnasium locker room improvements. Funding

3/1/2011

$

19,000,000

02262009

t s e

A T

O N

i m

Escanaba Area Public Schools- High School renovation

u q e

Submitted Requests - Not Approved

O R

PP

R d

e t tt

Mason Consolidated Schools

b u S Escanaba Area Public Schools Escanaba

Funding Request

Yale Public Schools/Farrell Elementary

s

Mason Consolidated Schools (Monroe)

Start Date

Expected Completion Date

8/1/2009

D VE

Route (Infrastructure Only)

497 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Delta-Schoolcraft ISD Escanaba Essexville-Hampton Public Schools Essexville

Project Name Delta-Schoolcraft ISD

Project Description Fitzharris High School Campus to educate our cooperative education and at risk students

Start Date 10/1/2009

Evart Public Schools

Evart

Evart Middle School

Evart Public Schools

Evart

Evart Middle School

Evart Public Schools

Evart

Evart Elementary School

Evart Elementary School

Put new blinds in every classroom. Most of the blinds are broke and don't work. This is a safety concern when we go into lockdowns because everyone in the classrooms can be seen from the outside at all times. It will also help to conserve energy. 6/15/2009

Evart

Evart Public Schools Evart Public Schools Evart Public Schools

Evart Evart Evart

Evart Middle School Evart Elementary School Evart Middle School

Evart Public Schools

Evart

Evart Middle School

Evart Public Schools Evart Public Schools

Evart Evart

Evart Public Schools Bus Garage Evart Elementary School

Evart Public Schools

Evart

Evart Middle School

Evart Public Schools Evart Public Schools Evart Public Schools

Evart Evart Evart

Evart Elementary School Evart Public Schools Bus Garage Evart Middle School

Evart Public Schools

Evart

Evart Public Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools

9/30/2010

Essexville-Hampton Public Schools We would install 1/4 inch panels with aluminum stops screwed onto our existing aluminum windows and apply caulk as required on every window in our middle school Our middle school is three stories high and was built 85 years ago. This would give us more insulation for our classrooms and be an energy saver for our district. 6/8/2009 We would purchase some 17 inch flat panel displays, thin clients, and a PC for each classroom. 6/8/2009 We would purchase thin clients for the classrooms, a PC for each classroom, and two network switches. 6/8/2009

Evart Public Schools

Expected Completion Date

d e t

T O

st

e u

q e R

N s

Put 6 inch thick concrete parking pad at the bus garage where are buses pull in and park between runs. It currently is a dirt area and is damp which leads to body damage under our buses. We would replace carpeting in a portion of the building

$

8,750,000

D VE $

35,000

$

38,900

8/15/2009

$

48,350

7/15/2009

$

66,000

6/8/2009 6/8/2009 6/8/2009

8/25/2009 9/15/2009 9/15/2009

$ $ $

68,358 84,000 98,000

5/8/2009

6/30/2009

$

18,500

9/15/2009 6/15/2009

9/30/2009 7/15/2009

$ $

20,000 25,500

6/30/2009

$

28,500

8/8/2009 6/5/2009 7/15/2009

$ $ $

33,000 34,500 35,500

8/6/2009

$

60,500

O R

P P A

We would have a company tuckpoint our three story middle school. It is a brick building that is 85 years old. In tuckpointing the building, the following steps would take place: power wash the building, tuckpoint damaged mortar joints, replace defective bricks, seal cracks, caulk window joints, caulk door joints, caulk other joints and areas as needed, repair construction joints, remove the top 3 feet of the chimney and install ColorKlad 26-gauge prefinished sheet metal solid chimney cap and apply colorflex to the exposed concrete foundation. This will protect and improve the buildings appearance, reduce future maintenance, improve safety and help cut down our lost of heat. We would replace heating units in some classrooms We would replace heating units in some classrooms Replace/Repair remaining sidewalks around Evart Middle School. This has been an on going project because of safety concerns.

8/15/2009

Funding Request

8/15/2009

Evart Elementary School

Repair/Replace the roof over the gymnasium in our middle school. It currently leaks as of a month ago when the temperature gets above 32 degrees or it is raining. 6/15/2009 We would install security cameras inside the building and on the outside of the building. 6/8/2009 Repair/Replace the roof on our bus garage as it is starting to leak 5/15/2009 We would replace carpeting in a portion of the building 6/15/2009 We would purchase heavy durable plastic playground equipment to be used by our K2 students. 7/6/2009

Evart Public Schools Bus Garage

Build a 120 foot by 60 foot pole barn with 14 foot side walls to house our remaining buses that cannot be parked in our bus garage. This would be heated. This would prolong the life of our buses.

7/6/2009

9/1/2009

$

100,000

Akron-Fairgrove

Replace/Fix High Boiler system

5/20/2009

8/30/2009

$

75,000

Fairgrove

Akron-Fairgrove

Modernize Heating and A/C Units

7/20/2009

5/20/2009

$

250,000

Fairgrove

Akron-Fairgrove

Classroom Carpet

7/20/2009

7/1/2010

$

30,000

Fairgrove

Akron-Fairgrove

Elementary Center for Academic Success

4/20/2009

8/30/2009

$

140,000

Evart Fairgrove

02262009

itt

S

m b u

Submitted Requests - Not Approved

Route (Infrastructure Only)

498 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Akron-Fairgrove Schools Farmington Public School District

Farmington Public School District

Farmington Public School District

Farmington Public School District

Farmington Public School District

Farmington Public School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Fairgrove

Akron-Fairgrove

Update High School Building- Classrooms

5/20/2009

7/1/2009

$

250,000

Fairgrove

Akron-Fairgrove

Landscaping HS/Ele

7/20/2009

6/20/2009

$

7,500

Fairgrove

Akron-Fairgrove

Fire/Safety Modernization

7/20/2009

12/30/2010

$

40,000

Fairgrove

Akron-Fairgrove

Update Bus Garage

4/20/2009

9/30/2009

$

40,000

Fairgrove

Akron-Fairgrove

Asphalt Resealing and Replacing

4/20/2009

$

45,000

Fairgrove

Akron-Fairgrove

Replace Plumbing

7/20/2009

$

55,000

Fairgrove

Akron-Fairgrove

Fix High School Roof

4/20/2009

9/30/2009

$

15,000

Fairgrove

Akron-Fairgrove

Well Modernization

PP

6/20/2009

5/20/2009

9/30/2009

$

10,000

Fairgrove

Akron-Fairgrove

Energy Audit and Retrofit

7/20/2009

8/30/2009

$

50,000

Fairgrove

Akron-Fairgrove

Replace Exterior Doors, Windows and Reseal Brickwork

7/20/2009

6/20/2009

$

200,000

Fairgrove

Akron-Fairgrove

Phone System and File Servers

5/20/2009

9/30/2009

$

70,000

Fairgrove

Akron-Fairgrove

Water Quality Issues

4/20/2009

7/20/2009

$

76,000

Farmington

Farmington Public Schools-Neighborhood Sidewalk Installation Program

Sidewalks for Children Safety - Installation of 22,500 lineal feet of sidewalk in the subdivisions adjacent to nine elementary school sites where elementary school children currently walk to school in the street.

150 days from approval

Oct.2009

$

90,000

Farmington

Replace Roof Top A/C Units - Roof top units typically have a 20 year life and so far Farmington Public Schools -Farmington High these 1989 units have not required major repairs to replace the compressors or other 150 days from School major components. They will be replaced with more energy efficient units. approval

8/1/2009

$

250,000

Farmington

Replace Auditorium - Replace existing 1970's auditorium with Performing Arts Center designed with teaching of performing arts at the forefront. The existing auditoriumns Farmington Public Schools -Farmington High have outdated sound, lighting, and stage areas and are unsuitable to offer students 180 days from School the kinds of education in these areas that are necessary in the 21st century. approval

Aug. 2010

$

4,500,000

Replace Auditorium - Replace existing 1970's auditorium with Performing Arts Center designed with teaching of performing arts at the forefront. The existing auditoriumns have outdated sound, lighting, and stage areas and are unsuitable to offer students 180 days from the kinds of education in these areas that are necessary in the 21st century. approval

Aug. 2010

$

4,500,000

Farmington Public Schools -Harrison High School

Replace Auditorium - Replace existing 1970's auditorium with Performing Arts Center designed with teaching of performing arts at the forefront. The existing auditoriumns have outdated sound, lighting, and stage areas and are unsuitable to offer students 180 days from the kinds of education in these areas that are necessary in the 21st century. approval

Aug. 2010

$

4,500,000

Farmington Public Schools - Fairview

New Elementary School -This project would provide for the replacement of two of the District's small 250 student, inefficient, 1950's vintage schools with larger more efficient 500 student schools. These school will have larger classrooms that accommodate technology for teaching in the 21st Century. The new school would be 90 days from LEED certified to provide a sustainable solution to the District's buildings needs. approval.

Oct.2010

$

19,000,000

tt i m

Farmington Public Schools -North FarmingtonHigh School

Farmington

Farmington

ub

S

Farmington Hills

02262009

d e t

e u

st

q e R

s

A T

O N

Submitted Requests - Not Approved

O R 7/20/2010

D VE

Route (Infrastructure Only)

499 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Farmington Public School District

Farmington Public School District

Farmington Public School District Farmington Public School District

Farmington Public School District Farmington Public School District

Farmington Public School District

Farmington Public School District

Farmington Hills

Farmington Hills

Farmington Hills

Farmington Hills

Farmington Hills

Farmington Hills

Farmington Hills

Project Description

Start Date

Farmington Public Schools -Harrison High School

Replace Chiller - During the warmer months, on many occasions, the existing chiller does not have enough capacity to adequately cool the building. The present energy saving ice bank was designed for the chiller to make ice at night and assist the chiller with cooling during the day. However with evening events, there is not enough capacity for the chiller to both make ice for the following day and cool the building for the evening event. Adding a secondary energy efficient chiller also making use of the ice bank will add to the sustainablilty of this site over time. This will require increasing the electrical switchgear which will also require space modification. This will be a two year project as substantial engineering is required and long lead time for equipment 180 days from purchases will be required. approval

Farmington Public Schools -Harrison High School

Add Auxillary Gym -This project proposes for the addition of an auxillary gym at this site to this 1970 High School. There are two other high schools in the District, both of which have auxillary gyms, but for budgetary reasons this site did not receive an aux gym when the others were added in 2000. This will have a regulation basket ball court, gymnastics area, seating for 200, fitness area and comply with storm water regulstions. It will also be energy efficient. This building received a renovation in 180 days from 2000 and has had the boilers system replaced in 2006. approval

Farmington Public Schools -North FarmingtonHigh School

Replace Pool Ventilation Unit - This 1995 ventilation unit runs 24 hours a day 365 day a year and has had some major repairs to the unit. Since 1997 we have spent $19,671 on contractor repairs (not including FPS technician’s time). Both compressors have been replaced. We will be exploring alternative ventilation 180 days from systems. approval

Farmington Public Schools -East Middle School

Repair Parking Lot - This asphalt lot has been on "our watch list" for several years and is in need of major repair in order to stop the unraveling of the pavement to avoid 150 days from future larger cost to replace the entire lot. approval

Farmington Public Schools -Harrison High School

Repair Parking lot - This asphalt area is becoming unraveled including some of the walkways in the area which have settled creating trip hazards at this busy intersection This project will stop the unraveling of the pavement to avoid future larger cost to 150 days from replace a much larger area at a later date. approval

Replace Roofs - This roof was replaced with a single ply roof in 1988. This roof is in need of replacement. Interesting to note the single ply has lasted 21 years . It will be 150 days from replaced by a long life built-up 4 ply roof. approval

O R

D VE

600,000

Aug. 2010

$

3,400,000

8/1/2009

$

125,000

Aug. 2009

$

150,000

Aug. 2009

$

75,000

8/1/2009

$

115,000

Replace Roofs - One of these roofs was replaced with single ply roofs in 1991. The southeast classroom roof was placed in 1978.and restored in 1997. Both of these Farmington Public Schools -Farmington High roofs are in need of replacement. Interesting to note the single ply has lasted 18 150 days from School years and the built-up 32 years. It will be replaced by a long life built-up 4 ply roof. approval

8/1/2009

$

255,000

Replace Piping - Because of the aging 1973 plumbing system at this location we have been experiencing numerous leaks due to corrosion and rust accumulation in both the domestic and heating water piping. Previous leaks of some piping has been repaired at various locations. This project will replace the piping starting at mechanical rooms and proceed down the corridors including replacemnt of the toiklet rooms and fixtures. The heating piping replacement will extend to the equipment it serves. The heating and cooling equipment has already been replaced and this piping project will sustain 150 days from this Energy Star Awarded building for many years. approval

9/1/2009

$

2,571,000

Farmington Public Schools -North FarmingtonHigh School

tt i m

d e t

Farmington Public Schools -Warner Milldle School

T O

N s

st

e u

q e R

P P A

Submitted Requests - Not Approved

Aug. 2010

Funding Request

$

b u S

Farmington Hills

02262009

Project Name

Expected Completion Date

Route (Infrastructure Only)

500 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Farmington Public School District

Farmington Public School District

Farmington Public School District

Farmington Public School District

Farmington Public School District Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools

Farmington Hills

Farmington Hills

Farmington Hills

Farmington Hills

Farmington Hills Fennville

Fennville

Fennville

Fennville Fennville

02262009

Start Date

Farmington Public Schools -O.E. Dunckel Middle School

Farmington Public Schools -Alameda

New Elementary School -This project would provide for the replacement of two of the District's small 250 student, inefficient, 1950's vintage schools with larger more efficient 500 student schools. These school will have larger classrooms that accommodate technology for teaching in the 21st Century. The new school would be 180 days from LEED certified to provide a sustainable solution to the District's buildings needs. approval

S

O R Aug. 2010

$

19,000,000

Farmington Public Schools -Wm Grace

New Elementary School -This project would provide for the replacement of two of the District's small 250 student, inefficient, 1950's vintage schools with larger more efficient 500 student schools. These school will have larger classrooms that accommodate technology for teaching in the 21st Century. The new school would be 180 days from LEED certified to provide a sustainable solution to the District's buildings needs. approval

Aug. 2010

$

19,000,000

Farmington Public Schools -Beechview

New Elementary School -This project would provide for the replacement of two of the District's small 350 student, inefficient, 1950's vintage schools with larger more efficient 500 student schools. These school will have larger classrooms that accommodate technology for teaching in the 21st Century. The new school would be 180 days from LEED certified to provide a sustainable solution to the District's buildings needs. approval

Aug. 2010

$

19,000,000

Replace Parking Lot -This 1990 asphalt lot has really started to unravel the last couple of years including much of the concrete curbs, sidewalks, and dumpster enclosure. Because of the increased parent drop-off of students causing congestion; we have had our traffic engineer review the site and offer suggestions for improvement which will be incorporated into the project. We will be incorporating Phase II Storm water measures such as stand pipe filters and aqua-swirls into the project to reduce storm 150 days from water run-off. approval

Aug. 2009

$

250,000

6/1/2009

6/8/2009

$

15,000

4/1/2009

4/8/2009

$

30,000

6/1/2009

7/15/2009

$

70,000

6/1/2009

6/15/2009

$

70,000

Immediate

6/15/2009

$

100,000

4/1/2009

4/22/2009

$

125,000

Immediate

Immediate

$

2,000

4/1/2009

4/8/2009

$

2,000

Immediate

Immediate

$

4,000

T O

st

e u

q e R

N s

Farmington Public Schools -Hillside Fennville Public Schools, Transportation Department Remove diesel fuel tanks from bus garage area Fennville Public Schools, Fennville High School Replace exhaust fans Fennville Public Schools, Fennville Elementary School Install dampers with direct digital control (plus electrical work) Fennville Public Schools, Fennville High School Replace Office HVAC Unit Fennville Public Schools, Fennville High School Update Controls to DDC Fennville Public Schools, Fennville High School Replace Football Stadium Lighting Fennville Public Schools, Fennville Elementary School Install motorized movie screen in media center Fennville Public Schools, Fennville High School Repair/replace fencing at football stadium seating area Fennville Public Schools, Fennville Middle School Replace kiln in art room

d e t

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

2,935,000

P P A

Aug. 2009

Funding Request

$

ub

Fennville

Fennville

Project Description

Replace Piping - Because of the aging 1957 plumbing system at this location we have been experiencing numerous leaks due to corrosion and rust accumulation in both the domestic and heating water piping. Previous leaks of some piping has been repaired at various locations. This project will replace the piping starting at mechanical rooms and proceed down the corridors including replacemnt of the toilet rooms and fixtures. The heating piping replacement will extend to the equipment it serves. The heating and cooling equipment has already been replaced and this piping project will sustain 150 days from this building for many years. approval

tt i m

Fennville

Fennville

Project Name

Expected Completion Date

501 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools Fennville Public Schools

Location City or Township Fennville Fennville Fennville Fennville Fennville Fennville Fennville Fennville Fennville Fennville Fennville Fennville Fennville

Fennville

Fennville Fennville Fennville

Fennville

Fennville Fennville Fennville

02262009

5,000

4/1/2009

4/8/2009

$

5,000

4/1/2009

4/8/2009

$

7,500

Immediate

3 Days

$

10,000

$

12,000

5 Days

$

15,000

6/8/2009

$

20,000

Immediate

Immediate

$

24,000

Immediate

5 Days

$

25,000

3/1/2009

3/15/2009

$

25,000

6/1/2009

6/15/2009

$

25,000

4/1/2009

4/21/2009

$

25,000

Immediate

5 Days

$

35,000

Immediate

30 days

$

35,000

6/1/2009

6/8/2009

$

35,000

6/1/2009

6/30/2009

$

50,000

Immediate

5 Days

$

50,000

Immediate

5 Days

$

50,000

6/1/2009

7/15/2009

$

56,000

Fennville Public Schools Install cable television in all buildings Fennville Public Schools, Fennville Elementary School Complete parking lot at Later Elementary Fennville Public Schools, Fennville Middle School Install classroom ceiling-mounted LCD projectors Fennville Public Schools, Transportation Department Replace bus garage roof Fennville Public Schools, Fennville High School Replace classroom carpeting

Immediate

Immediate

$

65,000

6/1/2009

6/8/2009

$

75,000

4/1/2009

4/8/2009

$

75,000

4/1/2009

4/15/2009

$

75,000

6/1/2009

7/15/2009

$

100,000

Fennville Public Schools Fennville Public Schools, Fennville High School Fennville Public Schools, Fennville Middle School

Replace servers, switches, and other technology infrastructure

Immediate

Immediate

$

100,000

Replace lockers in locker rooms

6/1/2009

6/15/2009

$

120,000

Replace student/teacher furniture

Immediate

Immediate

$

150,000

m b u

Fennville

Fennville

$

S

s

st

O R

4/1/2009 Immediate

PP

6/1/2009

A T

O N

R d

e t t

it

Fennville

Funding Request

3 Days

eq

Fennville

Start Date Immediate

e u

Fennville

Fennville

Project Name Project Description Fennville Public Schools, Fennville High School Motorize gymnasium basket hoists Fennville Public Schools, Fennville Middle School Replace exhaust fans Fennville Public Schools, Fennville High School Replace walkway on home side of football stadium Fennville Public Schools, Fennville High School Install fence for mezzanine weight area Fennville Public Schools, Fennville Elementary School Install fencing around playground Fennville Public Schools, Fennville High School Update sound system in gymnasium Fennville Public Schools, Fennville High School Replace south parking area Fennville Public Schools, Transportation Department Purchase and install digital video/GPS system for buses Fennville Public Schools, Fennville High School Install new sound system at football stadium Fennville Public Schools, Fennville High School Motorize gymnasium bleachers Fennville Public Schools, Fennville High School Replace analog clock system with digital clocks Fennville Public Schools, Fennville High School Replace site lighting around high school Fennville Public Schools, Fennville Middle School Create a new computer lab Fennville Public Schools, Fennville High School Create a new distance-learning computer lab Fennville Public Schools, Fennville High School Resurface track Fennville Public Schools, Fennville High School Replace corridor lighting Fennville Public Schools, Fennville High School Replace exterior doors Fennville Public Schools, Fennville Middle School Replace exterior doors Fennville Public Schools, Fennville High School Corridor carpet replacement

Expected Completion Date

Submitted Requests - Not Approved

4/4/2009

D VE

Route (Infrastructure Only)

502 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Fennville Public Schools Fennville Public Schools Ferndale Public Schools Ferndale Public Schools

Location City or Township

Fennville

Project Name Fennville Public Schools, Fennville Middle School Fennville Public Schools, Fennville High School

Ferndale

FPS-Jefferson Center

Ferndale

FPS-Taft Center

Elevator Addition to provide barrier free access to gymnasium and second floor Add Air conditioning at all classrooms. A/C to be added to existing newer unit ventilators

Ferndale Public Schools

Ferndale

FPS- Grant Early Childhood Center

Remodel existing building to add a full service kitchen facility including equipment, freezer and refrigerator. Existing facility being serviced by outside food vendor

9/1/2009

Ferndale Public Schools

Ferndale

FPS-Jackson Center

Remodel existing building to add a full service kitchen facility including equipment, freezer and refrigerator. Existing facility being serviced by outside food vendor

9/1/2009

Ferndale Public Schools

Ferndale

FPS- Roosevelt Primary School

Ferndale Public Schools

Ferndale

Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools

Ferndale Public Schools Ferndale Public Schools

Fennville

Project Description

Start Date

Expected Completion Date

Funding Request

Replace fascia on building exterior

4/1/2009

5/1/2009

$

309,000

Replace theatrical lighting in auditorium

Immediate

15 Days

$

80,000

9/1/2009

8/1/2010

$

250,000

6/1/2009

1/1/2010

$

300,000

$

400,000

O R 8/1/2010

D VE

8/1/2010

$

400,000

Add Air conditioning at all classrooms and replace heating and ventilation unit at gymnasium for energy efficiency. A/C to be added to existing newer unit ventilators

PP

9/1/2009

8/1/2010

$

500,000

FPS-Taft Center

Remodel existing building to add a full service kitchen facility including equipment, freezer and refrigerator. Existing facility being serviced by outside food vendor

9/1/2009

8/1/2010

$

500,000

Ferndale

FPS- Jefferson Center

Remodel existing building to add a full service kitchen facility including equipment, freezer and refrigerator. Existing facility being serviced by outside food vendor

9/1/2009

8/1/2010

$

600,000

Ferndale

FPS-Roosevelt Primary School

Remodel existing building to add a full service kitchen facility including equipment, freezer and refrigerator. Existing facility being serviced by outside food vendor

9/1/2009

8/1/2010

$

600,000

Ferndale

FPS-University High School

9/1/2009

8/1/2010

$

600,000

Ferndale

FPS-High School/Middle School campus

9/1/2009

8/1/2010

$

700,000

Ferndale

FPS-Jackson Center

9/1/2009

8/1/2010

$

700,000

Ferndale

FPS-Jefferson Center

9/1/2009

8/1/2010

$

800,000

12/1/2010

$

1,500,000

8/1/2010

$

2,000,000

8/1/2010

$

2,500,000

12/1/2010

$

2,750,000

8/1/2010

$

4,000,000

d e tt

Ferndale

FPS-High School/Middle School campus

Ferndale

FPS-High School/Middle School campus

it

m b u

Ferndale

Ferndale Ferndale

02262009

FPS-Jefferson Center

S

FPS-High School/Middle School campus FPS-High School/Middle School campus

A T

e u

st

s

O N

Remodel existing building to add a full service kitchen facility including equipment, freezer and refrigerator. Existing facility being serviced by outside food vendor Add Air conditioning at all classrooms. A/C to be added to existing newer unit ventilators Add new HVAC unit ventilators at all classrooms and support spaces for energy efficiency Add new HVAC unit ventilators at all classrooms and support spaces for energy efficiency

q e R

Remodeling existing Auditorium, Stage, replace stage equipment, sound system, theatrical lighting and rigging system. Project includes removal of asbestos ceiling in auditorium house. 9/1/2009 Remodel existing Cafeteria and Kitchen, replace kitchen equipment, walk-in freezers and refrigerators 9/1/2009 Remodel existing building to meet the needs of the growing program / improve technology equipment and facilities 9/1/2009 Replacement of the buildings original 1950's Heating and Ventilation systems at Auditorium, Student Commons, Cafeteria/Kitchen, Gymnasium, Pool and Main Office with new HVAC system for code compliance and energy efficiency 9/1/2009 Removal and replacement of ceiling and lights at all asbestos plaster ceilings at Classrooms, Corridors, Student Commons, Main Office, etc. 9/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

503 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Grand Haven Area Public Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools

Project Name

Start Date

Ferrysburg

Construction of an addition to Lake Hills Elementary would consist of adding a wing on the north end of the existing building to add additional classroom instructional space. Construction would consist of but not limited to, brick and mortar, electrical, HVAC, plumbing, flooring, ceilings, cabinetry, white boards, lighting, paint, windows, doors/frames, fire suppression. The construction would also include 6 additional Grand Haven Area Public Schools - Lake Hills classroom instructional spaces, and restrooms. The addition would be approximately 11,000 square feet, September, 2009 April, 2010 Elementary

Fillmore Township

Hamilton & Blue Star Elementary

conversion to T5 or T8 lighting fixtures

6/1/2009

Fillmore Township

Hamilton & Hamilton Middle

conversion to T5 or T8 lighting fixtures

6/1/2009

Fillmore Township

Hamilton & Hamilton High

conversion to T5 or T8 lighting fixtures

6/1/2009

Fillmore Township

Hamilton & Blue Star Elementary

geo-thermal heating & cooling system

Fillmore Township

Hamilton & Hamilton High

wind turbine for electric generation

Fillmore Township

Hamilton & Hamilton Middle

geo-thermal heating & cooling system

Fillmore Township

Hamilton & Hamilton High

geo-thermal heating & cooling system

Fillmore Township

Hamilton & Hamilton Middle

security cameras and card access

Fillmore Township

Hamilton & Blue Star Elementary

security cameras and card access

Fillmore Township

Hamilton & Blue Star Elementary

wireless data communications

Fillmore Township

Hamilton & Hamilton High

Fillmore Township

Hamilton & Hamilton Middle

Fillmore Township

Hamilton & Blue Star Elementary

Flint Flint Flint

02262009

b u S

Flint Community Schools

Beecher

Beecher - Tucker Elementary

Funding Request

D VE $

2,242,400

$

88,500

PP

8/1/2009

$

319,600

8/1/2009

$

390,000

9/1/2009

2/1/2010

$

1,180,000

8/1/2009

8/1/2010

$

1,350,000

9/1/2009

2/1/2010

$

6,392,000

9/1/2009

2/1/2010

$

7,800,000

6/1/2009

8/1/2009

$

79,900

6/1/2009

8/1/2009

$

89,500

6/1/2009

8/1/2009

$

118,000

security cameras and card access

6/1/2009

8/1/2009

$

136,500

wireless data communications

6/1/2009

8/1/2009

$

639,200

8/1/2009

2/1/2010

$

594,000

8/15/2012

$

175,000,000

9/15/2009

$

300,000

9/1/2009

$

100,000

eq

A T

s

st

e u

O N

R d

e t tt

i m

Flint City School District Beecher Community School District Beecher Community School District

Project Description

Expected Completion Date

additional classrooms for kindergarten (state forcing extended day programming)

Erecting, equipping and furnishing two new elementary school buildings and playgrounds; remodeling, equipping and reequipping existing school buildings; furnishing and refurnishing remodeled school buildings; equipping and reequipping school buildings for technology; and preparing, developing and improving existing school building sites and playgrounds. The maximum number of years the bonds may be outstanding, exclusive of refunding, is 25 years; the estimated millage that will be levied to pay the bonds in the first year that the levy is authorized is 5.0 mills (which is equal to $5.00 per $1,000 of taxable value of real and tangible personal property in the school district); the estimated millage that will be levied to pay the bonds in the second year that the levy is authorized and in each year thereafter is 8.00 mills; and the estimated simple average annual millage that will be required to retire the bonds is 7.83 mills. 6/1/2009 Replace 35 air handling units in all classrooms for more efficient heating in all buildings. 6/15/2009 Replacement of lighting fixtures in original building for more efficient electrical usage and better lighting. 6/15/2009

Submitted Requests - Not Approved

O R 8/1/2009

Route (Infrastructure Only)

504 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Flushing Community Schools

Flushing Community Schools

Flushing

Flushing

Project Name

Project Description

Start Date

Expected Completion Date

District-wide Temperature Control Upgrades

Upgrade existing building pneumatic temperature controls to digital temperature controls for increased energy efficiency and reduction of annual operating costs at the following schools: Flushing High School, Elms Elementary, Central Elementary, Springview Elementary, Seymour Elementary, Early Childhood Center / Community Services Building, and Administration Building. 4/22/2009

District-wide Re-roofing Projects

Replacement of existing roofing and partial insulation with new roofing and partial insulation. New roofing to be light colored reflective material to reduce heat island effect. New insulation to improve thermal performance of roof assembly and reduce energy consumption for building heating and cooling. Roofing replacement at the following schools: Springview Elementary, Elms Elementary, Central Elementary, and Community Services Building. 4/22/2009

8/1/2009

Funding Request

D VE $

1,230,775

8/1/2009

$

858,915

6/1/2009

9/1/2009

$

1,412,678

6/1/2009

9/1/2009

$

180,000

P P A

O R

Flushing

District-wide Interior Lighting Upgrades

Flushing

Boiler Replacement Projects

Upgrade existing interior T12 lighting with new energy efficient T8 lighting with electronic ballast and lighting control (occupancy sensors) for improved energy efficiency at the following schools: Flushing High School, Central Elementary, Elms Elementary, Seymour Elementary, Springview Elementary, Community Services Building, and Administration Building. Replacement of existing original boilers with new high efficiency boilers at Elms Elementary and Central Elementary Schools.

Flushing

Fire Alarm System Upgrade

Replacement of existing fire alarm system panel at the Community Services Building. 4/22/2009

6/1/2009

$

30,000

Fowler Public Schools Fowler

Installation of new roofs (or portions of) at Fowler Elementary/Middle school.

Cracked roof surfaces, leakage, molding, moisture problems and brick/tile discolorations are just a few of the issues that Fowler Public Schools are experiencing with old, worn and faulty roofs. 6/1/2009

7/1/2009

$

30,000

Fowler Public Schools Fowler

Roof improvements at Fowler High School. Project includes ventilation improvements

To alleviate condensation and moisture issues. Adding vents to roof fabric and additional building air handlers.

6/1/2009

8/1/2009

$

14,000

Fowler Bleacher repair and or refurbishing Fowler Replace sinks and water fountains at Fowler High school. Fowler Replace and repair damaged sidewalks around all school buildings.

To bring our current aged/outdated bleachers up to code. 6/1/2009 Due to age and wear many sinks are not functioning properly and replacement parts are not available. 6/1/2009 Due to age, wear and weather all sidewalks need to be repaired and or replaced around all school buildings. 6/1/2009

7/1/2009

$

7,000

7/1/2009

$

8,000

8/1/2009

$

10,000

4/1/2009

5/1/2009

$

15,000

4/1/2009

7/1/2009

$

25,000

Fowler High School track resurfacing Fowler Air conditioning in various locations in educational buildings Fowler Replace and repair light fixtures throughout entire district

Repair and resurface high school track. 6/1/2009 Replace current window units with integrated air conditioning system to extend the life of our technology and computer hardware systems. 6/1/2009 To improve energy efficiency and quality of lighting. All lighting fixtures need to be replaced. 6/1/2009

7/1/2009

$

40,000

7/1/2009

$

50,000

7/1/2009

$

180,000

Fowler Replacement and repair of exterior doors and windows in all school buildings.

Due to age and heating inefficiency, all exterior doors at Fowler elementary/middle school need to be replaced. In addition, there are a select few at the high school that need to be replaced as well. 6/1/2009

7/1/2009

$

200,000

Asphalt repair and replacement on parking lots and drives at both Fowler Waldron Elementary/Middle and High Schools Repair and replacement of all univents at Fowler High School building.

Mill and replace aged and cracked parking lots and drives and add curb and gutter to extend the life of project. 6/1/2009 Repair and replace ageing univents and air handling systems. Project would improve air quality and heating efficiency. 6/1/2009

8/1/2009

$

220,000

8/1/2009

$

80,000

Flushing Community Schools Flushing Community Schools Flushing Community Schools

Fowler Public Schools Fowler Fowler Public Schools Fowler

Fowler Public Schools Fowler

ub

Fowler Public Schools Fowler Fowler Public Schools Fowler

02262009

e t tt

i m

Fowler Public Schools Fowler

Fowler Public Schools Fowler

e u

eq

Fowler Replace locks and door handles, both exterior and interior, at all school building Replace all exterior and interior door handles and locks due to excessive wear and locations ageing and lack of reliability. Exterior wall and brick repair at Fowler High school building Repair, repoint and seal exterior brick.

Fowler Public Schools Fowler

Fowler Public Schools Fowler

s t s

-N

R d

Fowler Public Schools Fowler

Fowler Public Schools Fowler

T O

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

505 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Frankfort-Elberta Area Schools Frankfort-Elberta Area Schools Frankfort-Elberta Area Schools Frankfort-Elberta Area Schools Frankfort-Elberta Area Schools Frankfort-Elberta Area Schools Freeland Community School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Frankfort

Frankfort Elementary School

New doors in old caferia at high school: $6,700

5/20/2009

9/1/2009

$

6,700

Frankfort

Frankfort Elementary School

Sidewalk repair at high school: $12,350

5/20/2009

9/1/2009

$

12,350

Frankfort

Frankfort Elementary School

Three roofs at high school: $24,844

5/20/2009

9/1/2009

$

24,844

Frankfort

Frankfort Elementary School

Construction of meeting room and office space: $160,000

5/20/2009

9/1/2009

$

160,000

Frankfort

Frankfort High School

Re-surfacing high school parking lot: $64,429

5/20/2009

$

64,429

Frankfort

Frankfort Elementary School

Parking lot repair at elementary school: $25,000

5/20/2009

9/1/2009

$

25,000

4/30/2009

$

717,989

5/1/2009

$

1,500,072

5/1/2009

$

1,542,464

5/1/2009

$

428,592

5/1/2009

$

440,704

P P A

O R 9/1/2009

D VE

Freeland

Freeland Community School District

Fremont

Fremont-Quest

Fremont

Fremont-Pine Street

Technology replacement needs, including: computers, mounted data projectors, switches, data wiring, wireless WAN, server racks, servers, priinters, laptops, and backup tape drive. HVAC Systems Renovation - to include geothermal installation and energy management control HVAC Systems Renovation - to include geothermal installation and energy management control

Fremont

Fremont-Quest

Repair/replace electrical wiring & lighting systems

Fremont

Fremont-Pine Street

Repair/replace electrical wiring & lighting systems

Fremont

Fremont Daisy Brook

Repair/replace electrical wiring & lighting systems

5/1/2009

12/1/2010

$

888,000

Fremont

Fremont Middle School

5/1/2009

12/1/2010

$

1,760,000

Fremont

Fremont Daisy Brook

5/1/2009

5/1/2011

$

3,108,000

Fremont

Fremont-Pathfinder

5/1/2009

5/1/2011

$

4,480,000

Fremont

Fremont Middle School

Repair/replace electrical wiring & lighting systems HVAC Systems Renovation - to include geothermal installation and energy management control HVAC Systems Renovation - to include geothermal installation and energy management control HVAC Systems Renovation - to include geothermal installation and energy management control

5/1/2009

5/1/2010

$

6,160,000

Fremont

Fremont High School

HVAC Systems Renovation and energy management control

5/1/2009

5/1/2011

$

6,200,000

$

43,875,000

tt i m

Fremont Public School District Fremont

ub

-N

e u

d e t

Fremont Public School District

Fremont Public School District Fremont

s t s

T O

q e R

2/1/2009

Erecting, equipping and furnishing a new high school building and other facilities at the site for the new high school building; acquiring, preparing, developing and improving a site for a new high school building and other facilities; and acquiring and installing technology and technology equipment at a new high school building. Acquiring and installing technology and technology equipment in school buildings, including related infrastructure improvements.

Fremont-Quest

Improve safety and security of building occupants by redesigning main entrance and installation of additional access control points throughout the building 5/1/2009

5/1/2011

$

214,296

Fremont-Pine Street

Improve safety and security of building occupants by redesigning main entrance and installation of additional access control points throughout the building 5/1/2009

5/1/2011

$

220,352

Fremont Public School District Fremont

Fremont Daisy Brook

Improve safety and security of building occupants by redesigning main entrance and installation of additional access control points throughout the building 5/1/2009

5/1/2011

$

444,000

Fremont Public School District Fremont

Fremont-Pathfinder

Improve safety and security of building occupants by redesigning main entrance and installation of additional access control points throughout the building 5/1/2009

5/1/2011

$

640,000

Fremont Public School District Fremont

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

506 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Fremont Public School District Fremont Fremont Public School District Fremont Fremont Public School District Fremont

Fremont-Pine Street

Improve safety and security of building occupants by redesigning main entrance and installation of additional access control points throughout the building 5/1/2009 Improve wireless technologies, infrastructure and upgrades including fiber optics and computers 6/1/2009 Improve wireless technologies, infrastructure and upgrades including fiber optics and computers 6/1/2009

Fremont Public School District Fremont

Fremont-Quest

Bring the QU into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance

Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District

Fremont Middle School Fremont-Quest

Fremont

Fremont-Pine Street

Fremont

Fremont Daisy Brook

Fremont

Fremont-Pathfinder

Fremont

Fremont Middle School

Fremont Public School District Fremont Fremont Public School District Fremont

Fremont Public School District Fremont

Fruitport Community Schools

Fulton Schools

Garden City School District

Bring the PI into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance Improve wireless technologies, infrastructure and upgrades including fiber optics and computers Improve wireless technologies, infrastructure and upgrades including fiber optics and computers Improve wireless technologies, infrastructure and upgrades including fiber optics and computers

T O

5/1/2011 6/1/2011

Funding Request

$

D VE $

133,935

$

137,720

$

267,870

6/1/2011

$

275,440

6/1/2009

6/1/2011

$

277,500

6/1/2009

6/1/2011

$

400,000

6/1/2009

6/1/2011

$

550,000

6/1/2011

$

555,000

6/1/2011

$

775,000

6/1/2011

O R

6/1/2009

P P A 6/1/2009

-N

6/1/2011

Fremont High School

Fremont Middle School

Bring the MS into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance

6/1/2009

6/1/2011

$

1,100,000

Fremont High School

Repair/replace electrical wiring & lighting systems

5/1/2009

5/1/2010

$

2,480,000

Fremont High School

Bring the HS into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance

6/1/2009

6/1/2011

$

18,000,000

$

83,000,000

s t s

e u

eq

Route (Infrastructure Only)

880,000

Bring the DB into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance 6/1/2009 Improve wireless technologies, infrastructure and upgrades including fiber optics and computers 6/1/2009

Fremont Daisy Brook

Fremont Public School District Fremont Fremont Public School District Fremont

Expected Completion Date

R d

Fruitport

i m

Fulton Schools - Fulton Middle-High School

Exterior window replacement, wall insulation, building ventilation equipment, replace room heating units from radiant to univent, upgade electrical service, DDC controls system and new boilers. 6/14/2009

9/1/2009

$

1,366,200

Garden City Public Schools

A district-wide energy conservation project to replace boilers, add a district-wide HVAC control system and also provide an inspection and repair system for all buildings to maintain optimum efficiency. The estimated annual energy savings for the project is $230,000 or 16% of the annual energy cost; the project will produce a significant reduction in greenhouse gas emissions. With the exception of one elementary building and the administration building, all boilers in the district are 50 years or older. The estimated payback, with stimulus package funding, is 9.04 years, without the funding the payback is estimated at 12 years. Following is a project cost by building. 6/15/2009

4/1/2010

$

2,875,000

b u S

Fulton Township

Garden City, MI

02262009

e t tt

Fruitport Community Schools

Erecting, furnishing and equipping a new high school; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities to convert the existing high school to an intermediate/middle school and the existing middle school to an elementary school; acquiring, installing and equipping educational technology for existing school facilities and the new high school; constructing, equipping, developing and improving play and practice fields and related facilities and playgrounds, and developing and improving the sites.

Submitted Requests - Not Approved

507 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Traverse City Area Public Schools

Traverse City Area Public Schools Traverse City Area Public Schools Traverse City Area Public Schools

Traverse City Area Public Schools

Traverse City Area Public Schools

Gaylord Community Schools Gibraltar School District Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools

Garfield Township

Garfield Township

Garfield Township

Garfield Township

Garfield Township

Garfield Township

Project Name

Project Description

Start Date

Traverse City Area Public Schools

Creation of new fuel island dispensing station for Traverse City Area Public Schools bus fleet, support vehicles and local municipal transit entities including Bay Area Transit Authority, Traverse Bay ISD, and shared services for Bellaire School District. Fuel island constructed with specific environmentally friendly methods and focus on conservation practices creating a low VOC and low engine emission of fleet operation Current/existing facility at end of existing life cycle. 6/1/2009

Traverse City Area Public Schools

Renovate existing building to move Administrative support and operational staff to a centralized location within the district which will result in more efficient/less costly administrative functions, thereby allowing more $ to be allocated to classroom instructional or instructional support functions. Building will also house data and communications center.

6/1/2009

Traverse City Area Public Schools

Renovate existing warehouse operations to accommodate print shop. Print shop works with local ISD to help with supporting regional printing, shipping and maintenance including local governmental entities and local college.

Gibraltar Girard Township Girard Township

12/1/2009

$

800,000

6/1/2009

12/1/2009

$

850,000

Traverse City Area Public Schools - West Middle School

Complete redevelopment of a middle school site to address safe routes to school, safe parent drop off, and pedestrian walk ways to promote safe walking to school and community activities. 6/1/2009

12/1/2009

$

2,000,000

Traverse City Area Public Schools

Develop and install storm water control systems with curb, gutter, water infiltration system, and water reclamation systems. Create land surface paving and concrete to decrease dust and control and manage all oil and gas leakage to prevent ground and stream contamination. Surface water to be run through oil and water separators and hazards shipped to environmental disposal sites. 8/1/2009

8/1/2010

$

800,000

Traverse City Area Public Schools

Construction of a data and communication center, with shared services for area government entities, scope includes command center, disaster recovery, security and building automation control systems. Replace current phone system and switch with new IP phone system. 8/1/2009

8/1/2010

$

1,800,000

8/30/2009

$

1,000,000

Aug, 2009

$

64,000

30 days after start

$

14,000

60 days after start

$

22,000

60 days after start

$

54,000

Girard Township

90 days after start

$

91,200

S

Girard Township

60 days after start 120 days after start

$

96,000

Girard Township

$

375,000

O R

P P A

N s

t s e

Replace existing roof @ High School with Steel or Recycled Rubber,Replace exterior doors and thresholds, Replace obsolete energy management system, Retrofit all HID lighting with energy efficient induction or flourescent, Replace parking lot lighting w/energy efficient induction lighting lighting, Replace existing carpet with climate Gaylord Community Schools neutral recyclable carpet, 6/8/2009 Gibraltar School District Carlson High School Relamp lighting areas in the Hallways, Gymnasiums, and Cafeteria. Estimated annual and Shumate Middle School savings in energy costs of $16,000 June, 2009 Within 90 days Coldwater Franklin High School Recommission heating, ventilation, and hot water systems from approval Within 90 days Coldwater Franklin High School Provide heating hot water non-chemical filtration system from approval Within 90 days Coldwater Franklin High School Masonry repairs after approval Within 90 days Coldwater Franklin High School Provide Variable Frequency Drive and controller for boiler heating hot water pumps from approval Within 90 days Coldwater Franklin School Replace roof after approval Build a gymnasium at a former elementary school that now houses secondary Within 180 days Coldwater Franklin High School students from approval

R d

e t t

it

m b u

Girard Township

D VE

400,000

T O

10/1/2009

Funding Request

$

u q e

Gaylord

Expected Completion Date

Gladstone

Gladstone-High School HVAC Programing

System programing of HVAC system at high school

3/1/2009

3/10/2009

$

10,000

Gladstone

Gladstone-Junior High-Boiler Controls

Replace outdated boiler control systems

3/1/2009

3/10/2009

$

25,000

Gladstone

Gladstone-Cameron-Boiler

Replace outdated boiler system in Cameron Elementary

3/1/2009

3/31/2009

$

70,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

508 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gladstone Area Schools Gobles Public School District

Gobles Public School District Gobles Public School District Gobles Public School District

Location City or Township Gladstone

Project Name Gladstone-District Wide-Technology Replacement

Project Description

Start Date

Expected Completion Date

Funding Request

Replace computers/peripherals beyond useful lives

3/1/2009

3/31/2009

$

200,000

Replace existing energy inefficient lighting with T-8 lighting

6/1/2009

6/30/2009

$

10,000

Gladstone

Gladstone-High School-Gym Lighting Gladstone-District Wide Exterior Weatherization of Schools

Point/tuck brick and waterproof to keep additional brick face from splitting off buildings 6/1/2009

7/31/2009

$

25,000

Gladstone

Gladstone-Football Field-Irrigation System

Replace existing watering system (hoses/sprinklers) with automated irrigation system 6/1/2009

6/30/2009

$

25,000

Gladstone

Gladstone-High School-Roof Repairs

New roof/redesign of section adversely affected by Winter weather

$

50,000

Gladstone

Gladstone-Junior High-Roof New roof at Junior High School Gladstone-Jones, Cameron-Update Sinks and Cupboards Update Sinks and Cupboards

PP

6/30/2009

$

100,000

8/31/2009

$

100,000

6/1/2009

6/30/2009

$

150,000

6/1/2009

8/31/2009

$

300,000

6/1/2009

7/31/2009

$

300,000

6/1/2009

7/31/2009

$

457,000

3/1/2009

3/31/2009

$

100,000

6/1/2009

6/30/2009

$

5,000

6/1/2009

6/30/2009

$

17,000

6/1/2009

6/30/2009

$

25,000

Replace existing entryway at Cameron Elementary which is in need of great repair 6/1/2009 Put up fencing and establish tennis courts which would integrate with playground and make safer 6/1/2009

8/31/2009

$

40,000

8/31/2009

$

45,000

Gladstone

Gladstone Gladstone

O R

6/1/2009 6/1/2009

6/1/2009

A T

Gladstone

Gladstone-Jones-Roof Gladstone-Junior High, Jones, Cameron-ADA Restroom Upgrades Gladstone-District Wide-Green Energy Initiative

Gladstone

Gladstone-District Wide-Window Replacement Replace windows in schools

Gladstone

Gladstone-District Wide-Technology Upgrade Upgrade memory, operating systems on existing computers

Gladstone

Gladstone-High School-Bleacher Repair

Gladstone Gladstone

Gladstone-Jones-Gym Flooring Replace existing asbestos flooring with wood flooring Gladstone-High School-Handicapped Parking Add an additional parking lot for handicapped which would be significantly closer to Lot building

Gladstone

Gladstone-Cameron-Entryway

Gladstone

Gladstone-Jones-Playground/Tennis Courts

Gladstone

Gladstone-Junior High-Bleacher Replacement Replace existing bleachers which do not meet code with new bleachers

6/1/2009

7/31/2009

$

100,000

Gladstone

Gladstone-District Wide-Parking Lots Gladstone-Cameron-Additional Permanent Classrooms (2)

Replace/repair existing lots Add two classrooms to Cameron Elementary to reduce crowding and portable classroom

6/1/2009

6/30/2009

$

155,000

6/1/2009

8/31/2009

$

400,000

Gobles Public Schools

HVAC Upgrade

6/1/2009

9/1/2009

$

30,000

Gobles Public Schools

Energy Efficiency Upgrades: Removal of abestos floor tiles and ceiling tiles in older elementary and MS/HS buildings; installation of flooring and carpet in elementary and MS/HS buildings; installation of ceilings and/or high efficiency lighting in elementary and MS/HS buildings; installation of motion sensors for room light control in elementary and MS/HS buildings; old window replacement with energy efficient windows; replacement of some entry doors; plumbing upgrades in elementary and MS/HS buildings (this project can be broken down into component parts). 6/1/2009

9/1/2009

$

360,000

4/30/2009

8/30/2010

$

270,000

3/1/2009

6/30/2009

$

75,000

Gladstone

m b u

Gobles

Gobles

S

Gobles

Gobles Public Schools

Gobles

Gobles Public Schools

02262009

Upgrade current non-ADA compliant bathrooms to comply with ADA specifications Utilize a combination of wind, solar and biodiesel to reduce utility costs, educate students

st

s

O N

Address a safety issue with our existing bleachers by making needed modifications

e u

eq

R d

e t t

it

Gladstone

New roof at Jones Elementary School

6/30/2009

D VE

Enery Savings: Install a wind turbine to produce electricity for the district Safety Improvements: Modernize fire alarm systems in elementary and MS/HS buildings

Submitted Requests - Not Approved

Route (Infrastructure Only)

509 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Gobles Public School District Gobles Public School District Gobles Public School District Gobles Public School District Gobles Public School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Gobles

Gobles Public Schools

Security Improvements: Upgrade camera system, connective wiring, and computer

3/1/2009

7/1/2009

$

50,000

Gobles

Gobles Public Schools

Security Improvements: Secure entry area in MS/HS

4/15/2009

9/1/2009

$

75,000

Gobles

Gobles Public Schools

4/30/2009

8/30/2009

$

100,000

Gobles

Gobles Public Schools

Safety Improvements: Sidewalks to connect from buildings to community sidewalks Technology Upgrades: wiring, equipment (data projectors, smart boards, document camera)

3/1/2009

8/30/2009

$

160,000

Gobles

$

175,000

PP

6/1/2010

$

30,000

St. Clair County Resa Goodells Grand Blanc Community Schools Grand Blanc Grand Blanc Community Schools Grand Blanc

Gobles Public Schools Security Upgrade: Relocation of MS/HS offices for security St. Clair County RESA - Pine River Nature Center New construction - Pole Barn for outdoor programs St. Clair County RESA - Pine River Nature Center Build pedestrian bridges Grand Blanc Community Schools, High Schoo Install a fully automated pool cover at the High School East Campus Pool to reduce East Campus Pool Cover consumption of energy, water and chemicals. Grand Blanc Community Schools, High Schoo Install a fully automated pool cover at the High School West Campus Pool to reduce West Campus Pool Cover consumption of energy, water and chemicals.

6/1/2010

$

15,000

4/23/2009

9/1/2009

$

75,000

4/23/2009

9/1/2009

$

100,000

Grand Blanc Community Schools

Grand Blanc

Grand Blanc Community Schools, McGrath Elementary School Exterior Restoration and Weatherproofing

Masonry restoration, new metal flashings, water repellent sealing, sheet metal replacement as needed, window replacement as needed, EIFS restoration

4/23/2009

9/1/2009

$

310,000

Grand Blanc

Grand Blanc Community Schools, Perry Center Exterior Restoration and Weatherproofing

Masonry restoration, new metal flashings, water repellent sealing, sheet metal replacement as needed, window replacement as needed, EIFS restoration

4/23/2009

9/1/2009

$

470,000

Grand Blanc

Grand Blanc Community Schools, Brendel Elementary School HVAC Replacement

Replace the existing HVAC system to improve indoor air quality and bring buildings up to current codes for air exchanges. Including removal of asbestos, installing new roof, energy efficient HVAC roof top units and automated HVAC control system. 6/15/2009

9/1/2010

$

3,000,000

9/1/2010

$

3,000,000

St. Clair County Resa Goodells

Grand Blanc Community Schools

Grand Blanc Community Schools

Grand Blanc Community Schools Grand Blanc Community Schools Grand Blanc Community Schools Grand Blanc Community Schools

Grand Blanc Community Schools Grand Blanc Community Schools Grand Blanc Community Schools Grand Blanc Community Schools Grand Blanc Community Schools

6/1/2009 6/9/2009

A T

s

t s e

O N

u q e

O R

6/1/2009

Replace the existing HVAC system to improve indoor air quality and bring buildings up to current codes for air exchanges. Including removal of asbestos, installing new roof, energy efficient HVAC roof top units and automated HVAC control system. 6/15/2009

8/30/2010

D VE

Grand Blanc Community Schools, Myers Elementary School HVAC Replacement Grand Blanc Community Schools, Perry Center Boiler Replacement Grand Blanc Community Schools, Perry Center Window Replacement

Replace existing low pressure steam boiler.

6/15/2010

9/1/2010

$

700,000

Replace existing windows in the Perry Center with energy efficient windows.

7/23/2009

9/1/2010

$

1,000,000

Grand Blanc

Grand Blanc Community Schools, Paul Madison Building Replacement

Replace Paul Madison Building, a modular structure, which has well outlived its useful life with an energy efficient, technologically upgraded facility, which meets current codes. 7/23/2009

9/1/2010

$

2,200,000

Grand Blanc

Grand Blanc Community Schools, McGrath Elementary School HVAC Replacement

Replace the existing HVAC system to improve indoor air quality and bring buildings up to current codes for air exchanges. Including removal of asbestos, installing new roof, energy efficient HVAC roof top units and automated HVAC control system. 6/15/2010

9/1/2010

$

5,000,000

Grand Blanc Community Schools, Anderson Elementary School Projector Project

Install ceiling mounted projectors in all classrooms to enable students to better learn using technology. Provide appropriate electrical service and data service to the projectors.

6/15/2009

9/1/2009

$

88,000

Grand Blanc Community Schools, Perry Center Projector Project

Install ceiling mounted projectors in all classrooms to enable students to better learn using technology. Provide appropriate electrical service and data service to the projectors.

6/15/2009

9/1/2009

$

88,000

Grand Blanc Community Schools, Brendel Elementary School Projector Project

Install ceiling mounted projectors in all classrooms to enable students to better learn using technology. Provide appropriate electrical service and data service to the projectors.

6/15/2009

9/1/2009

$

90,000

Grand Blanc Community Schools, Myers Elementary School Projector Project

Install ceiling mounted projectors in all classrooms to enable students to better learn using technology. Provide appropriate electrical service and data service to the projectors.

6/15/2009

9/1/2009

$

90,000

Grand Blanc

R d

Grand Blanc Grand Blanc

Grand Blanc

Grand Blanc

Grand Blanc

02262009

i m

ub

S

Grand Blanc

e t tt

Submitted Requests - Not Approved

Route (Infrastructure Only)

510 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Grand Blanc Community Schools

Grand Blanc

Grand Blanc Community Schools, McGrath Elementary School Projector Project

Install ceiling mounted projectors in all classrooms to enable students to better learn using technology. Provide appropriate electrical service and data service to the projectors.

Grand Blanc Community Schools

Grand Blanc

Grand Blanc Community Schools, McGrath Elementary School Fire Alarm Replacement

Replace Fire Alarm system at McGrath Elementary School.

6/15/2009

9/1/2009

Grand Blanc Community Schools

Grand Blanc

Grand Blanc Community Schools, Replacement of existing telephone system

Replace existing phone system with VoIP system.

4/23/2009

9/1/2010

Grand Blanc

Rebuild both front and back parking lots and driveway at the High School West Grand Blanc Community Schools, High Schoo Campus. Including removing existing asphalt, curb and gutter and regrading the site. West Campus Parking Lots and Driveway Installing drainage, lighting, appropriate sub base material(sand and stone) and Replacement appropriate base and top coarses of asphalt. 5/23/2009

Grand Blanc Community Schools

Grand Blanc Academy Grand Blanc

Grand Haven

Grand Haven Area Public Schools

Grand Haven

Grand Haven Area Public Schools - White Pines Middle School

This renovation project would convert one classroom, art storage, and maintenance storage into educational classroom space. An additional new maintenance storage building will be built to the north of it's current location, with the conversion of the current storage area into educational classroom space. The current classroom would be renovated to current classroom standards by increasing the amount of floor space, installation of heating/ventilation, ceilings, and upgraded lighting and electrical. The current art storage room would be increased in size to accommodate educational material for the elementary and middle school art programs. The new maintenance area would include new walls, ceilings, roofing, electrical, and lighting. July, 2009

d e t

Grand Haven Area Public Schools

itt

N s

st

D VE

200,000

$

1,500,000

9/1/2009

$

2,000,000

10/1/2009

$

1,400,000

October, 2009

$

275,000

$

29,460,000

Acquiring and installing technology infrastructure in school district buildings; remodeling, furnishing, refurnishing, equipping and reequipping Lake Shore Middle School and Grand Haven High School, including boiler replacement, building entrances, offices, safety and security improvements, window and door replacement, energy conservation improvements including geothermal technology, lighting, and site improvements; roof replacements and improvements for school district buildings, and purchasing school buses. Remodeling, furnishing, refurnishing, equipping and reequipping school district buildings, including boiler replacement, window and door replacement, energy conservation improvements, lighting and site improvements.

q e R

120,000

Grand Haven Area Public Schools - Grand Haven High School

The fitness center to be constructed would be approximately 3,600 spare feet constructed with brick and mortar, including but not limited to block walls, foundation, carpet, rubberized flooring, lighting, electrical, ceilings, windows, doors, and paint. Also included in the construction would be restroom and shower facilities, exercise and weight equipment to service pupils in physical education classes, and the students and community in after school activities. October, 2009

March, 2010

$

800,000

Grand Haven Charter Township

Grand Haven Area Public Schools - Grand Haven High School

Expansion of the music wing would increase the amount of square footage by 4,100 square feet by the movement of the south and west walls, including foundation, roof of the band/orchestra classroom, the installation of new acoustical tiles, electrical, lighting, ceilings, tile, doors, carpet, heating/ventilation, fire suppression, instrument storage, painting, and a sound system. Also includes the expansion of the current hallway and scene shop work space that is connected to the music wing to be symmetric to the layout of the current building. August, 2009

December, 2009

$

540,000

Grand Ledge

Grand Ledge Public, all buildings

upgrade to energy management system

10/1/2009

$

250,000

m b u

Grand Haven Charter Township

S Grand Haven Area Public Schools Grand Ledge Public Schools

7/1/2009

$

$

O R

P P A

Construct addition and improvements to current school facility

e u

Grand Haven Area Public Schools

9/1/2009

Grand Blanc Academy

T O

Grand Haven Area Public Schools

6/15/2009

Funding Request

02262009

Submitted Requests - Not Approved

6/1/2009

Route (Infrastructure Only)

511 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Grand Ledge Public Schools Grand Ledge Public Schools Grand Ledge Public Schools Grand Ledge Public Schools Grand Ledge Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Grand Ledge

Grand Ledge Public, all buildings

replacement of modular boilers with energy efficient condensing boilers

6/1/2009

10/1/2009

$

750,000

Grand Ledge

Grand Ledge Public, Holbrook Elementary

Add acoustic panels in cafeteria for noise reduction

6/1/2009

9/1/2009

$

30,000

Grand Ledge

Grand Ledge Public, Beagle Middle School

replace existing cafeteria roof with energy improvements

6/1/2009

10/1/2009

$

85,000

Grand Ledge

Grand Ledge Public, Beagle Middle School

Parking site lighting replacement with energy efficient fixtures

6/1/2009

9/1/2009

$

200,000

Grand Ledge

Grand Ledge Public, Sawdon

replace single-pane window with energy efficient thermal units

6/1/2009

$

753,512

Grand Rapids

Kelloggsville High School

Eliminate pnumatic controls switch to DDC

3/1/2009

9/1/2009

$

500,000

Grand Rapids

Kelloggsville High School

Replace steam coil univents and abandon steam piping in tunnels

3/1/2009

9/1/2009

$

650,000

Grand Rapids

Kelloggsville High School

Replace steam boilers with hot water boilers

3/1/2009

10/31/2009

$

350,000

Grand Rapids

Kelloggsville Administration Building

Install energy mgmt systems - DDC Controls

3/1/2009

8/31/2009

$

50,000

Grand Rapids

Kellogsville-Disovery Alternative HS

New AHU in gym

3/1/2009

8/31/2009

$

50,000

Grand Rapids

Kelloggsville Administration Building

Replace AHU

3/1/2009

8/31/2009

$

100,000

Grand Rapids

Kelloggsville High School

Replace roof over gym

3/1/2009

8/1/2009

$

120,000

Grand Rapids

Kelloggsville Middle School

Install AHU motor frequency drives

3/1/2009

8/31/2009

$

150,000

Grand Rapids

Kelloggsville West Elementary

Replace single pane windows with insulated windows

3/1/2009

8/31/2009

$

150,000

Grand Rapids

Kelloggsville Early Childhood Center

Replace single pane windows with insulated windows

3/1/2009

8/31/2009

$

150,000

Grand Rapids

Kelloggsville Southeast Elementary

Replace single pane windows with insulated windows

3/1/2009

8/31/2009

$

200,000

Grand Rapids

Kelloggsville Middle School

Upgrade energy mgmt system

3/1/2009

8/31/2009

$

200,000

Grand Rapids

Kelloggsville District-Wide

Upgrade Phone systems

3/1/2009

8/31/2009

$

200,000

Grand Rapids

Kelloggsville Early Childhood Center

Eliminate fin tube heat and install fresh air univents

3/1/2009

8/31/2009

$

250,000

Grand Rapids

Kellogsville-Disovery Alternative HS

Eliminate fin tube heat and install fresh air univents

3/1/2009

8/31/2009

$

250,000

Kelloggsville District-Wide

Network Infrastructure/hardware

3/1/2009

8/31/2009

$

250,000

Kelloggsville West Elementary

Install energy mgmt systems - DDC Controls

3/1/2009

8/31/2009

$

300,000

Kelloggsville Early Childhood Center

Install energy mgmt systems - DDC Controls

3/1/2009

8/31/2009

$

300,000

Kelloggsville Southeast Elementary

Install energy mgmt systems - DDC Controls

3/1/2009

8/31/2009

$

300,000

Grand Rapids

Kelloggsville East Elementary

Install energy mgmt systems - DDC Controls

3/1/2009

8/31/2009

$

300,000

Grand Rapids

Kellogsville-Disovery Alternative HS

Install energy mgmt systems - DDC Controls

3/1/2009

8/31/2009

$

300,000

Grand Rapids

Kelloggsville West Elementary

Eliminate fin tube heat and install fresh air univents

3/1/2009

8/31/2009

$

350,000

m b u

Grand Rapids Grand Rapids

S

Grand Rapids Grand Rapids

02262009

O N

R d

e t t

it

st

e u

eq

s

A T

Submitted Requests - Not Approved

PP

O R 10/1/2009

D VE

Route (Infrastructure Only)

512 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools Kelloggsville Public Schools

Kent ISD Kent Intermediate School District Forest Hills Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Grand Rapids

Kelloggsville Southeast Elementary

Eliminate fin tube heat and install fresh air univents

3/1/2009

8/31/2009

$

350,000

Grand Rapids

Kelloggsville East Elementary

Eliminate fin tube heat and install fresh air univents

3/1/2009

8/31/2009

$

350,000

Grand Rapids

Kelloggsville High School

Replace gym AHU (air handling unit)

3/1/2009

8/31/2009

$

400,000

Grand Rapids

Kelloggsville High School

3/1/2009

10/31/2009

$

700,000

Grand Rapids

Kelloggsville District-Wide

$

800,000

Grand Rapids

Kellogsville-Disovery Alternative HS

8/31/2010

$

1,217,065

Grand Rapids

Kelloggsville High School

Replace AHU/1 Classroom Projection/ClassroomSound/Computer replacement labs and classrooms. Have been unable to keep up with necessary rotation. New addition - 8500 sq ft. Increased student enrollment requires more classroom space. New auditorium to support increasing drama classes as well as all other fine arts classes.

8/31/2010

$

1,800,000

O R

3/1/2009 6/15/2009

PP

6/15/2009

A T

8/31/2009

D VE

3/1/2010

$

3,000,000

Grand Rapids

We are proposing an addition to our current Kent Career Technical Center/CC to provide a Culinary Arts Program partnership with both GRCC and Baker College. This would provide a Community College Hospitality Classes and allow our Hospitality Kent Intermediate School District, Kent Career students the ability to enroll for early college credit. In addition, the colleges would use Technical Center/CC Addition the space after hours to provide college courses to the community. . 6/1/2009 Kent Intermediate School District, Kent Career Technical Center/CC Addition Infrastructure project to rebuild the internal roadway system for the campus. 6/1/2009

9/1/2009

$

750,000

Grand Rapids Township

Forest Hills

10/1/2009

$

2,194,340

Grandville

Grandville Grand View Elementary roof

Collins Elementary - Building addition and renovation 4/1/2009 Replacement of roof, including improvements to gutters and exterior finish insulation system. 6/8/2009

8/31/2009

$

360,000

Grandville

Grandville Grand View Elementary boilers

Replace boilers, univent filter frames, and general upgrades to HVAC system.

6/8/2009

8/31/2009

$

450,000

Grandville

Grandville East Elementary plumbing

Install sink and water fountain in preschool classroom.

6/8/2009

8/31/2009

$

5,000

Grandville

Grandville East Elementary dumpster

Move dumpster and enclose

6/8/2009

8/31/2009

$

5,000

Grandville

GrandvilleCentral Elementary ventilation

Replace and upgrade staff bathroom ventilation system.

6/8/2009

8/31/2009

$

5,000

Grandville

Grandville Middle School fire prevention

Install backflow preventers for existing fire protection system.

6/8/2009

8/31/2009

$

6,000

Grandville

Grandville High School plumbing

Replace and upgrade domestic hot water mixing valves

6/8/2009

8/31/2009

$

6,000

Grandville

Grandville Grand View Elementary PA system Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

6,220

Grand Rapids

m b u

Grandville

R d

e t t

it

st

e u

eq

s

O N

Grandville East Elementary fence

Install fence at the north side of the campus.

6/8/2009

8/31/2009

$

7,500

Grandville Central Elementary fence

Install fence at the south side of the campus.

6/8/2009

8/31/2009

$

7,500

Grandville East Elementary fire alarm system Replace and upgrad building's fire alarm system.

6/8/2009

8/31/2009

$

7,500

Grandville High School ceiling

Replace and upgrade acoustical tiles in building.

6/8/2009

8/31/2009

$

9,000

Grandville High School paint booth

Replace paint spray booth in wood shop.

6/8/2009

8/31/2009

$

10,000

Grandville

Grandville West Elementary ceiling

Replace and upgrade acoustical tiles in building.

6/8/2009

8/31/2009

$

14,750

Grandville

Grandville East Elementary ceiling

Replace and upgrade acoustical tiles in entire building.

6/8/2009

8/31/2009

$

15,000

Grandville Grandville Grandville Grandville

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

513 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Grandville

Grandville High School fire doors

Replace and upgrade roll-up fire doors

6/8/2009

8/31/2009

$

15,000

Grandville

Grandville Middle School PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

16,035

Grandville

Grandville Grand View Elementary fence

Install fence at the north side of the campus.

6/8/2009

8/31/2009

$

18,000

Grandville

Install fence at the edge of the campus.

6/8/2009

8/31/2009

$

22,500

Grandville

Grandville South Elementary fence Grandville Grandville Administration building fire protection

Replace fire protection plumbing.

6/8/2009

$

25,000

Grandville

Grandville Middle School ADA toilets

Improve lavatories by installing ADA toilets in mens' and womens' restrooms.

6/8/2009

8/31/2009

$

40,000

Grandville

Grandville High School security

Replace, upgrade and install additional cameras and card readers.

6/8/2009

8/31/2009

$

50,000

Grandville

Grandville Middle School ceiling Grandville West Elementary parking and entrance.

Replace and upgrade acoustical tiles in building. 6/8/2009 Redesign and improvement of parking area at entrance to building to improve safety and expand space available for pick-up and drop-off. 6/8/2009

8/31/2009

$

60,750

8/31/2009

$

81,200

Grandville Central Elementary ceiling Grandville Central Elementary entry and parking

Replace and upgrade acoustical tiles in entire building.

6/8/2009

8/31/2009

$

85,000

Redesign and improvement of parking area at entrance to building to improve safety. 6/8/2009

8/31/2009

$

89,000

8/31/2009

$

190,000

8/31/2009

$

250,000

8/31/2009

$

265,000

6/8/2009

8/31/2009

$

350,000

6/8/2009

8/31/2009

$

950,000

Replace and upgrade insulation and gas controls for boilers.

6/8/2009

8/31/2009

$

15,000

Install DDC temperature control system.

6/8/2009

8/31/2009

$

25,000

Replace boiler and unit ventilators in Grounds Building on Middle School campus.

6/8/2009

8/31/2009

$

60,000

Grandville Central Elementary plumbing Grandville Cummings Elementary classroom lighting

Replace and upgrade hot water and cold water plumbing to classrooms.

6/8/2009

8/31/2009

$

67,972

Replace and upgrade calssroom lighting.

6/8/2009

8/31/2009

$

74,250

Grandville High School chiller

Upgrade chiller, replace small chiller and add VFD controls.

6/8/2009

8/31/2009

$

160,000

Grandville South Elementary roof replacement Replacement of roof. 6/8/2009 Replacement of roof, including improvements to gutters and exterior finish insulation Grand View Elementary roof system. 6/8/2009

8/31/2009

$

310,000

8/31/2009

$

360,000

Grandville

Grand View Elementary boilers

Replace boilers, univent filter frames, and general upgrades to HVAC system.

6/8/2009

8/31/2009

$

450,000

Grandville

Grandville High School roof

Replacement of roof and eaves.

6/8/2009

8/31/2009

$

1,440,000

Grandville Grandville Grandville

s

A T

O N

PP

Grandville

Upgrade and/or replace playground equipment to meet mandatory safety standards, Grandville Cummings Elementary playground including relocation of certain equipment from a different campus. 6/8/2009 Upgrade and/or replace entry doors and hardware at multiple locations throughout the Grandville Public Schools - district-wide doors district 6/8/2009

Grandville

Grandville Middle School parking lot

Improve traffic flow in the Middle School entrance, exit and parking lot to increase safety of students entering and exiting the building, as well as traffic flow in and out of the campus. 6/8/2009

Grandville

Grandville Public Schools - district-wide carpet Upgrade and/or replace carpeting at multiple locations throughout the district Grandville Public Schools - district-wide telephones Replacement of telephone system, including new hardware and voicemail system.

Grandville

Grandville Grandville Grandville Grandville

Grandville Middle School Grounds Building

m b u

Grandville Grandville Grandville Grandville Grandville

02262009

S

e u

eq

R d

Grandville High School boilers Grandville Orion School temperature control system

e t t

it

st

Submitted Requests - Not Approved

O R 8/31/2009

D VE

Route (Infrastructure Only)

514 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools Grandville Public Schools

Location City or Township Grandville

Project Name Grandville Middle School mechanical upgrades

Phase III of mechanical upgrades project, including unit ventilator replacements.

6/8/2009

8/31/2009

$

2,800,000

Grandville

Grandville East Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

500

Grandville

Grandville Orion School exhaust fans

Install commercial-grade exhaust fans.

6/8/2009

8/31/2009

$

3,000

Grandville

Grandville Central Elementary PA system

Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

3,400

Grandville

Grandville West Elementary PA system

Replace and upgrade building public address system.

6/8/2009

$

3,600

Grandville

Grandville West Elementary fence

Install fence at the south side of the campus.

6/8/2009

8/31/2009

$

3,750

Grandville

Grandville Cummings Elementary power pole Replace power pole at parking lot with underground supply.

8/31/2009

$

4,160

Grandville

Grandville South Elementary PA system

6/8/2009

8/31/2009

$

4,420

Grandville

Grandville Cummings Elementary PA system Replace and upgrade building public address system.

6/8/2009

8/31/2009

$

4,950

Grandville

Central Elementary ventilation

Replace and upgrade staff bathroom ventilation system.

6/8/2009

8/31/2009

$

5,000

Grandville

Central Elementary fence

Install fence at the south side of the campus.

6/8/2009

8/31/2009

$

7,500

8/31/2009

$

190,000

8/24/2010

$

500,000

8/24/2009

$

780,000

111/1/2009

$

161,100

Replace 6 exterior windows. 6/15/2009 Install additional exterior lighting and upgrade existing lighting at all buildings in district to reduce vandalism. 6/1/2009 Upgrade electrical in old wing of the building to add additional classroom outlets and distribution services. 6/1/2009 Upgrade electrical throughout building to add additional classroom outlets and distribution services. 6/1/2009 Replace roof, repair foundation damage near exit 2 & 6 and repair cracked back wall and front canopy. 6/1/2009 Replace roof, repair cracks in the brick exterior wall near custodial entrance and repair/replace cracked chimney. 6/1/2009

7/1/2009

$

70,000

8/25/2009

$

250,000

8/25/2009

$

300,000

8/1/2009

$

300,000

7/30/2009

$

700,000

8/25/2009

$

750,000

6/1/2009

8/25/2009

$

1,000,000

Pinckney Community Schools - District-wide

Renovate existing pool area to utilize the space to create additional classrooms. Replacement and Upgrade of Furniture & Equipment All new equipment would be energy efficient

6/1/2009

6/1/2010

$

4,500,000

Pinckney Community Schools - District-wide

Acquiring & Improving Sites

6/1/2009

6/1/2010

$

500,000

Pinckney Community Schools - Lakeland Elementary

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

6/1/2010

$

873,565

Grandville Public Schools Grandville South Lyon Community Schools Green Oak Twsp. South Lyon Community Schools Green Oak Twsp. Grosse Ile Township Schools Gwinn Area Community Schools Gwinn Area Community Schools Gwinn Area Community Schools Gwinn Area Community Schools Gwinn Area Community Schools Gwinn Area Community Schools Gwinn Area Community Schools Pinckney Community Schools Pinckney Community Schools

Pinckney Community Schools

Project Description

Start Date

Expected Completion Date

6/8/2009

A T

Replace and upgrade building public address system.

s

PP

O N

Upgrade and/or replace playground equipment to meet mandatory safety standards, including relocation of certain equipment from a different campus. 6/8/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009

st

Cummings Elementary playground South Lyon Community Schools - Brummer Elementary School South Lyon Community Schools - Brummer Elementary School

Install air conditioning - No air conditioning currently in building

Grosse Ile Township

East River Administration Building

Replacement of building DDC controls and the installation of two new boilers. Building energy cost is $4.13 per sq. ft. compared to a range of $0.79 to $1.40 per sq. ft. at other school buildings. 8/1/2009

Gwinn

Gwinn/High School

Gwinn

Gwinn District

Gwinn

Gwinn/KI Sawyer Elementary

Gwinn

Gwinn/Gilbert Elementary

m b u

Gwinn

Gwinn/Gilbert Elementary

Gwinn Gwinn Hamburg Hamburg

Gwinn/KI Sawyer Elementary

S

Hamburg Twp

02262009

eq

6/15/2009

R d

e t t

it

e u

Gwinn/High School

Submitted Requests - Not Approved

O R 8/31/2009

Funding Request

D VE

Route (Infrastructure Only)

515 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Pinckney Community Schools

Pinckney Community Schools

Pinckney Community Schools

Hamilton Community Schools Hamilton Community Schools

Hamtramck Public Schools Hancock Public Schools Hancock Public Schools Hancock Public Schools Hancock Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

Hamburg Twp

Pinckney Community Schools - Country Elementary

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

6/1/2010

Hamburg Twp

Pinckney Community Schools - Navigator School

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

6/1/2010

Hamburg Twp

Pinckney Community Schools - Pathfinder School

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

Hamilton

Hamilton Community Schools

Erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; purchasing school buses; and acquiring, developing and improving sites, playgrounds, outdoor physical education and athletic facilities. 6/1/2009

Hamilton

Hamilton Community Schools

Hamtramck

Hancock

Hamtramck Public Schools Hancock Public School - Barkell Elementary Water Heater Replacement Hancock Public School - Barkell Elementary Boiler Replacement Hancock Public School - Barkell Elementary Lighting Upgrades Hancock Public Schools - Phone System Upgrades

Harbor Springs

Harbor Springs, High School

Harbor Springs

Harbor Springs, High School

Harbor Springs

Harbor Springs, High School

Harbor Springs

Harbor Springs, Blackbird Elementary

Hancock Hancock Hancock

tt i m

d e t

b u S City Of Harper Woods Schools Harper Woods

02262009

The School District of the City of Harper Woods, Beacon and Tyrone

Funding Request

$

3,471,343

$

4,167,210

6/1/2010

$

16,762,820

6/1/2011

$

26,920,000

6/1/2009

8/15/2011

$

33,395,000

6/1/2009

8/30/2009

$

100,000

Replace heating boilers with new high efficiency boilers 6/1/2009 Replace HID lighting with energy efficient flourescent lighting and add lighting controls (motion sensors) 6/1/2009

8/30/2009

$

200,000

9/30/2009

$

125,000

T O

P P A

-N

Erecting, furnishing and equipping additions to, and remodleing, furnishing and refurnishing, equipping and re-equipping the schools; acquiring, installing and equipping technology for the schools; and developing and improving sites

s t s

Replace Domestic Water maker with new high efficiency water maker

e u

q e R

O R

D VE

Replace current phone systems with VOIP system interconnecting all facilities

6/1/2009

9/30/2009

$

75,000

Install vents in our High school Science Classrooms

6/15/2009

8/28/2009

$

20,000

New band room with Storage at the High School 6/15/2009 Add Concession Stand, Bathrooms and a lower level changing rooms for the Football Stadium 6/1/2009

8/28/2010

$

210,000

8/28/2010

$

950,000

Early Childhood Center addition attached to Blackbird Elementary

8/28/2010

$

1,012,500

$

13,789,500

Beacon is our K-3 grade building which is in need of major renovations; Tyrone is the 3-6 grade building in need of renovations. Proposed is a plan that would combine both Buildings into one new elementary school. This would result in a building that would be energy efficient and would reduce the carbon footprint of Harper Woods School District. Although the district has tried bond issues for this building; they have failed to pass. In the current economic climate, our community can not/would not support raising taxes. The citizens of Harper Woods are facing many hardships currently as is the state of Michigan. If approved, this building would be built on the exciting property of Beacon elementary and consist of 23 general education classrooms for grades 1 - 6 and 2 Kindergarten classrooms. It would have much needed conference rooms, two special services/ resource rooms. It would also provide the much needed upgrade in the technology in both elementaries.

Submitted Requests - Not Approved

6/15/2009

Route (Infrastructure Only)

516 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City Of Harper Woods Schools Harper Woods

If complete building is not approved, updates for each building are needed.The total dollars to update both buildings is substantial. Estimates for the renovation of asbestos floors to carpeting or vinyl approx $200K. Replacement of windows $439K. Interior classroom, administration and teachers workroom renovations; gymnasium, classroom and media center; site development for Tyrone $4,356K. Beacon interior classroom, administration renovations; gymnasium/stage, media center and classroom addition; site development $4,479K. Converting the existing Steam Boilers to hot water or other reliable heating source in Beacon had been estimated in excess of $30K. All of these projects described are shovel ready or could be with in the next 180 days.

Harrison Community Schools

Harrison Community Schools

All of our school buildings require improvements/additions to our entries which are currently not energy efficient and in some cases unsafe. Accessibility also needs to be improved in some of the buildings. We propose to address these issues in all of our buildings which will involve about eight entries and a loading dock. The renovations will include energy efficient doors and windows, the addition of vestibules, an accessible ramp, replacing and adding more efficient heating units, and walls and a roof on a loading dock. 6/1/2009

Harrison Community Schools

Hillside Elementary currently has a gym floor which is severely damaged and has been for many years. The floor has been repaired a number of times, but it still warps and lifts almost every year. To make this facility more utile and safer for our students, we will replace the floor and the HVAC system for the gymnasium. This project is also critical due to the fact that the current floor adhesive has been determined to contain asbestos. 6/1/2009

Harrison Community Schools

Harrison

Harrison

Harrison Community Schools

Harrison Community Schools

Harrison

Harrison

Harrison

02262009

O R

Funding Request

9,304,200

8/27/2009

$

154,000

8/27/2009

$

224,000

Harrison Community High School and Larson Elementary both are in need of some renovations and additions. In both buildings the offices are undersized, inconvenient and unsafe. Our proposal would be to expand and redesign them. Larson Elementary is in need of additional classroom space due to overcrowding. It is an open space school, and the overcrowding is a safety issue. We propose to build an additional two classroom spaces. The high school is in need of a kitchen expansion, casework, and renovation to the teacher area and storerooms. The building is also an open space school; the lack of storage space and casework creates an unsightly and unsafe environment. 6/1/2009

8/27/2009

$

529,000

Harrison Community Schools

The changes to the state mandated curriculum, the Michigan Merit Core Curriculum, make it imperative that schools change the delivery of services to high school and alternative education students, especially those who fall behind and become credit deficit. We propose to upgrade one or two classrooms to allow for individualized online learning and credit recovery. We would need to purchase up to 40 computers and subscriptions to online instructional software aligned with the state curriculum. 6/1/2009

8/27/2009

$

75,000

Harrison Community Schools Hillside Elementary School

Our upper elementary building, Hillside Elementary, needs a new roof on most of the building. The project would entail about 71,000 square feet. We currently have a number of roof leaks which we continue to patch with little success. We replaced a small portion last summer over the library. The inspection of the rest of the roof at that time indicated that the entire roof would need to be replaced within a few years to prevent the likelihood of major roof failure. Our plan would be to improve the energy efficiency of the building by increasing the insulation on the roof to aid in fuel conservation. 6/1/2009

8/27/2009

$

1,000,000

T O

d e t

Harrison Community Schools

tt i m

b u S

q e R

P P A

N s

st

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

e u

Harrison Community Schools

Expected Completion Date

517 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Hart Public School District

Project Name

Project Description

Start Date

Project 1: Spitler Elementary Addition: A 19500 SF, 12-classroom addition onto the existing elementary school. Also includes a new multi purpose room, serving kitchen and toilet facilities. Total budget including all contingencies, CM and Architectural fees is $3,661,619. Spitler Elementary Renovations: A complete renovation / upgrade of the existing 20100 SF elementary school. Includes demolition, repairs and maintenance to existing structural systems, new millwork, new doors and hardware, new windows, new finishes, new lockers, new plumbing fixtures, new electrical fixtures and upgrades to the mechanical and electrical systems. Total budget including all contingencies, CM and Architectural fees is $1,523,855. Parking Improvements: A new and replaced asphalt paving, curbs and bus drop offs for the Spitler Elementary parking lot, Main campus parking lot, and High School parking lot. Total budget including all contingencies, CM and Architectural fees is $1,331,372. Middle School Hart Public School District/Spitler Elementary, Cafeteria and Classroom Additions: A 1120 SF addition onto the existing Middle School cafeteria and a 4134 SF 2 classroom addition onto the existing Middle School. 4/15/2009 Parking and Middle School

Hart

Expected Completion Date

T O

P P A

O R

Funding Request

D VE

August of 2010

$

7,411,081

July of 2011

$

3,992,217

6/15/2009

8/31/2009

$

35,000

6/15/2009

8/31/2009

$

60,000

6/15/2009

8/31/2009

$

225,000

6/15/2009

8/31/2009

$

450,000

Project 2: Middle School Stage Room Addition: A 2680 SF addition onto the existing Middle School Auditorium for storage and workrooms for the Auditorium. Total budget including all contingencies, CM and Architectural fees is $448,423. High School Renovations: A renovation / upgrade of the existing 71288 SF High School. Work includes demolition, repairs and maintenance to existing structural systems, new millwork, new doors and hardware, new windows, new finishes, new lockers, new plumbing fixtures, new electrical fixtures and upgrades to the mechanical and electrical systems. Total budget including all contingencies, CM and Architectural fees is $2,422,984. Hart Upper Elementary Conversion: A remodel / conversion of the existing Hart Upper Elementary school into the administration building / school board offices. Work includes demolition, repairs and maintenance to existing structural systems, new millwork, new doors and hardware, new windows, new finishes, new plumbing fixtures, new electrical fixtures and upgrades to the mechanical and electrical systems. The total budget including all contingencies, CM and Architectural 7/15/2009

Route (Infrastructure Only)

N s

t s e

qu

Hart Public School District Hart Hartford Public School District Hartford

Hart Public School District/Middle School, High School and Upper Elementary

Hartford Public School District Hartford Hartford Public School District Hartford

Hartford Public Schools - High School, Middle School, Red Arrow Elem, & Woodside Elem Upgrade heating controls to energy efficient computerized controls Hartford Public Schools - High School & Red Arrow Elem Replace 50 year old boilers with new energy efficient boilers

Hartford Public School District Hartford Public School District Hartford Public School District Hartford Public School District Hartford Public School District Hartford Public School District

Hartford Public Schools - High School, Middle School, Red Arrow Elem, & Woodside Elem Replace computers in all classrooms

Hartford Public Schools - Middle School

itt

Hartford

m b u

Hartford Hartford Hartford Hartford Hartford

Hartford Public School District Hartford

02262009

d e t

S

e R

Install energy efficient airconitioner unit in auditorium

Hartford Public Schools - High School

Install automatic bleacher operator on High School Bleachers

6/15/2009

8/31/2009

$

10,000

Hartford Public Schools - Middle School

Install new carpeting in Auditorium

6/15/2009

8/31/2009

$

15,000

Hartford Public Schools - Woodside Elem Hartford Public Schools - Transportation Facility

Install fencing around Woodside Elementary Playground for security

6/15/2009

8/31/2009

$

40,000

construct asphalt parking lot for bus parking

6/15/2009

8/31/2009

$

80,000

Hartford Public Schools - Woodside Elem

construct asphalt parking lot for bus uloading area at elementary school

6/15/2009

8/31/2009

$

80,000

6/15/2009

8/31/2009

$

210,000

Hartford Public Schools - High School, Middle School, Red Arrow Elem, & Woodside Elem Upgrade File Servers and install computer cables to classrooms

Submitted Requests - Not Approved

518 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Hartford Public School District Hartford

Hartford Public Schools - High School, Middle Upgrade all classrooms to support Smart Boards, LCD Projectors and related School, Red Arrow Elem, & Woodside Elem technology

6/15/2009

8/31/2009

Hartland Consolidated Schools Hartland

Hartland Schools boilers

replace boiler and circulation pump at the 51 Building

5/1/2010

6/30/2010

Hartland Consolidated Schools Hartland

Hartland Schools variable speed motors

install variable speed motors on mechanical equip't for energy efficiency at Hartland High School

8/1/2009

3/31/2010

Hartland Consolidated Schools Hartland

Hartland Schools lighting and occupancy sensors

replace lighting and install occupancy sensors in 28,000 SF of classroom space at Round Elementary School

8/15/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools lighting and occupancy sensors

replace lighting and install occupancy sensors in 50,000 SF Farms Intermdiate Schoo (includes replacement of no longer available coffered ceiling system, rework of linear diffusers, and relocation of existing sprinkler heads) 8/15/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools heating system piping

replace deteriorated heating system distribution piping at Lakes Elementary

$

1,142,000

D VE $

48,000

$

50,000

12/31/2009

$

190,000

12/31/2009

$

750,000

8/1/2009

8/1/2010

$

420,000

replace deteriorated heating system distribution piping at Farms Intermediate School 8/1/2009

8/1/2010

$

1,000,000

Hastings

Hartland Schools heating system piping Barry ISD Professional Development Upgrades

Conference Room addition/renovation

Aug. 2009

Mar. 2010

$

250,000

Heath Township

Hamilton & Hamilton Elementary

conversion to T5 or T8 lighting fixtures

6/1/2009

8/1/2009

$

117,825

Heath Township

Hamilton & Hamilton Elementary

geo-thermal heating & cooling system

9/1/2009

2/1/2010

$

1,571,000

Heath Township

Hamilton & Hamilton Elementary

security cameras and card access

6/1/2009

8/1/2009

$

129,275

Heath Township

Hamilton & Hamilton Elementary

wireless data communications

6/1/2009

8/1/2009

$

157,100

Heath Township

Hamilton & Hamilton Elementary

additional classroom for early childhood special education at central location

8/1/2009

2/1/2010

$

297,000

Heath Township

Hamilton & Hamilton Elementary Reed City Area Public Schools Hersey Building Reed City Area Public Schools Hersey Building Gull Lake Community Schools - Kellogg Agricultural Building Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary

additional classrooms for kindergarten (state forcing extended day programming) SAFETY: Update Fire Alarm System in Hersey Building

8/1/2009

2/1/2010

$

594,000

6/8/2009

8/3/2009

$

20,000

Replace Main Electric Service

6/8/2009

8/3/2009

$

22,000

Asbestos Abatement

2/1/2009

3/1/2009

$

75,000

Change over to T-8 lighting in classrooms and halls for energy efficiency Sink and countertop replacement in classrooms for ADA compliance and student safety

6/1/2009

9/1/2009

$

13,000

6/1/2009

9/1/2009

$

20,000

Intercom system for emergency communication

6/1/2009

9/1/2009

$

25,000

Renovate restrooms for ADA compliance Replacement of doors and locks which includes front vestibule. Increase energy efficiency

6/1/2009

5/1/2010

$

30,000

6/1/2009

9/1/2009

$

37,000

Replacement of boilers

6/1/2009

9/1/2009

$

170,000

Hartland Consolidated Schools Hartland Twp. Barry ISD Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Reed City Area Public Schools Reed City Area Public Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools

Funding Request

Hersey Hersey

m b u

Hickory Corners Hickory Corners

S

Hickory Corners Hickory Corners Hickory Corners Hickory Corners Hickory Corners

02262009

s t s

-N

e u

eq

R d

e t t

it

T O

P P A

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

519 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Gull Lake Community Schools Hickory Corners Gull Lake Community Schools Hickory Corners Gull Lake Community Schools Hickory Corners

Project Name Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary Gull Lake Community Schools - Kellogg Elementary

Gull Lake Community Schools Gull Lake Community Schools

Hickory Corners

Gull Lake Community Schools - Kellogg Agricultural Building & Kellogg Elementary Gull Lake Community Schools - Kellogg Agricultural Building

Highland

Huron Valley Schools

Huron Valley Schools

Huron Valley Schools

Hickory Corners

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Start Date

Huron Valley Schools - Highland Middle School Huron Valley Schools - District wide improvements Huron Valley Schools Huron Valley Schools - Spring Mills Elementary School

d e t

Funding Request

HVAC system repair for student safety and improved environment

6/1/2009

9/1/2010

$

200,000

Replace windows with energy efficient windows

6/1/2009

9/1/2009

$

225,000

Rooftop airhandlers; ventilation for air quality and energy efficiency

6/1/2009

9/1/2010

$

300,000

Connect with Gull Lake Sewer & Water authority for public sewer system

6/1/2009

9/1/2009

$

312,500

Renovation project for early childhood center

6/1/2009

$

2,900,000

$

2,933,650

Replace computers 5 or more years old

Huron Valley Schools - Highland Middle School

Highland

Project Description

Expected Completion Date

P P A 4/2/2009

T O

Replace cooling unit in 2 computer labs

N s

st

O R

6/15/2009

5/1/2010

9/1/2009

9/1/2009

D VE $

Huron Valley Schools - replace cooling unit in 10 elementary school 30,000 computer labs

Huron Valley Schools - replace cooling unit in 10 elementary school 60,000 computer labs

Replace domestic water heater and pumps

6/15/2009

9/1/2009

$

Install hand dryers in lieu of paper towel dispensers

6/15/2009

9/1/2010

$

300,000

Replace 7-year old network electronics

6/1/2009

9/1/2009

$

905,175

Replace office and gym air handlers and ductwork

6/15/2010

9/1/2010

$

105,000

e u

q e R

Route (Infrastructure Only)

6/15/2010

9/1/2010

$

Huron Valley Schools - replace cooling unit in 10 elementary school 150,000 computer labs

6/15/2010

9/1/2010

$

175,000

6/15/2010

9/1/2010

$

370,000

6/15/2010

9/1/2010

$

400,000

6/15/2010

9/1/2010

$

540,000

Huron Valley Schools - 10 elementary schools Replace existing modular boilers with 90% efficient boilers

6/15/2010

9/1/2010

$

1,500,000

Highland

Huron Valley Schools

Add SmartBoards to all classroom

4/2/2009

9/1/2009

$

1,299,000

Highland

Huron Valley Schools

Update application software to latest releases

4/2/2009

9/1/2009

$

2,050,000

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Huron Valley Schools

Highland

Huron Valley Schools

itt

Huron Valley Schools - 10 elementary schools Replace cooling unit in 10 elementary school computer labs Huron Valley Schools - Spring Mills Elementary School Replace original boiler with 90% efficient boiler Huron Valley Schools - Highland Elementary School Replace ceilings and upgrade lighting to more energy efficient lighting Huron Valley Schools - Apollo Elementary School Replace ceilings and upgrade lighting to more energy efficient lighting Huron Valley Schools - Spring Mills Elementary School Replace ceilings and upgrade lighting to more energy efficient lighting

Highland

Huron Valley Schools Huron Valley Schools

02262009

S

m b u

Submitted Requests - Not Approved

520 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Huron Valley Schools Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District

Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District

Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District

Project Name

Highland

Huron Valley Schools

Holland

Holland Public Schools - Heights K-7

Holland

Holland Public Schools - West K-7

Holland Holland

Project Description

Start Date

Expected Completion Date

Funding Request

6/1/2009

9/1/2009

$

818,681

9/1/2009

8/4/2010

$

280,000

9/1/2009

8/4/2010

$

300,000

Holland Public Schools - East K-7

Replace old/failing CAT3/5 data wiring with Cat 6 Re-pave parking lots and add bio-swale runoff capture basins with indigenous plants to reduce waste run-off into City Sewers - Heights K-7 Re-pave parking lots and add bio-swale runoff capture basins with indigenous plants to reduce waste run-off into City Sewers - West K-7 Re-pave parking lots and add bio-swale runoff capture basins with indigenous plants to reduce waste run-off into City Sewers - East K-7

9/1/2009

8/4/2010

$

325,000

Holland Public Schools - Jefferson K-7

Re-pave and improve the bus parking to improve student safety - Jefferson K-7

9/1/2009

$

340,000

Holland

Holland Public Schools - High school

8/4/2010

$

350,000

Holland

Holland Public Schools - High School

Develop pedestrian walk way from West K-7 to the High School campus and connect with the existing City of Holland wellness trails and overall wellness initiatives - High school 9/1/2009 Re-pave parking lots and add bio-swale runoff capture basins with indigenous plants to reduce waste run-off into City Sewers - High School 9/1/2009

8/4/2010

$

500,000

9/1/2010

$

850,000

8/4/2011

$

1,350,000

5/1/2010

$

1,750,000

8/3/2011

$

2,435,000

8/2/2011

$

2,525,000

8/1/2011

$

3,500,000

5/1/2010

$

3,585,000

5/1/2010

$

5,240,000

5/1/2010

$

5,630,000

5/1/2010

$

7,500,000

9/1/2010

9/1/2012

$

35,000,000

Improve traffic flow in the K-7 School entrance, exit and parking lot to increase safety of students entering and exiting the building, as well as traffic flow in and out of the campus. - Heights K-7 9/1/2009

8/4/2010

$

150,000

8/4/2010

$

175,000

8/4/2010

$

375,000

8/4/2010

$

375,000

8/4/2010

$

375,000

P P A

Install a bio-diesel fuel tank, re-locate the fueling depot and maintenance garage in close proximity to the central HPS buildings. This fueling depot would be used by HPS, Holland city, MAX bus authority and other city services (Fire, Police). - District Wide 9/1/2009 Replace existing roofing with green roof or energy efficient roof to improve the building envelope - VanRaalte 9/1/2009 Install Geo-Thermal Heating and Cooling Systems to reduce energy usage and improve learning environment - Heights K-7 9/1/2009 Replace existing roofing with green roof or energy efficient roof to improve the building envelope - East K-7 9/1/2009 Replace existing roofing with green roof or energy efficient roof to improve the building envelope - West K-7 9/1/2009 Replace existing roofing with green roof or energy efficient roof to improve the building envelope - High School 9/1/2009 Install Geo-Thermal Heating and Cooling Systems to reduce energy usage and improve learning environment - Jefferson K-7 9/1/2009 Install Geo-Thermal Heating and Cooling Systems to reduce energy usage and improve learning environment - East K-7 9/1/2009 Install Geo-Thermal Heating and Cooling Systems to reduce energy usage and improve learning environment - West K-7 9/1/2009 Install Geo-Thermal Heating and Cooling Systems to reduce energy usage and improve learning environment - High School 9/1/2009

T O

Holland

Holland Public Schools - District Wide

Holland

Holland Public Schools - VanRaalte

Holland

Holland Public Schools - Heights K-7

Holland

Holland Public Schools - East K-7

Holland

Holland Public Schools - West K-7

Holland

Holland Public Schools - High School

Holland

Holland Public Schools - Jefferson K-7

Holland

Holland Public Schools - East K-7

Holland

Holland Public Schools - West K-7

Holland

Holland Public Schools - High School

Holland

Update the current High School building to meet today's standards for energy efficiency (LEED certified), safety and security, adaptive technology use, Holland Public Schools - High School Building organizational sustainability, improved traffic flow, built-in adaptability and lower Energy Efficiency and Usage Updates operational costs

tt i m

ub

Holland

Holland Holland

d e t

Holland Public Schools - Heights K-7

S

Holland Public Schools - East K-7 Holland Public Schools - VanRaalte

Holland

Holland Public Schools - West K-7

Holland

Holland Public Schools - East K-7

02262009

s t s

-N

e u

q e R

Improve traffic flow in the K-7 School entrance, exit and parking lot to increase safety of students entering and exiting the building, as well as traffic flow in and out of the campus. - East K-7 9/1/2009 Enclose internal courtyard and develop a flexible group learning space for alternative education students - VanRaalte 9/1/2009 Improve traffic flow in the K-7 School entrance, exit and parking lot to increase safety of students entering and exiting the building, as well as traffic flow in and out of the campus. - West K-7 9/1/2009 Modify and enhance the security of the building though new entrances and modified egress and flow - East K-7 9/1/2009

Submitted Requests - Not Approved

O R 8/4/2010

D VE

Route (Infrastructure Only)

521 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Holland City School District Holland Holland City School District Holland Holland City School District Holland City School District

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

6/1/2010

$

450,000

Holland Public Schools - District Wide

Project Description Start Date Connect District buildings with Fiber network to allow for efficient data sharing District wide 8/1/2009 Improve Security Entrances for buildings to meet new access realities, including entry doors and hardware - District Wide 9/1/2009

8/4/2010

$

1,245,000

Holland Public Schools - Heights K-7

Renovate and expand science and multi-use learning spaces for technology and performing arts areas of school building to accommodate today's current programs and best teaching practices - Heights K-7

8/1/2009

6/1/2011

$

3,500,000

Holland Public Schools - Jefferson K-7

Renovate and expand science and multi-use learning spaces for technology and performing arts areas of school building to accommodate today's current programs and best teaching practices - Jefferson K-7

8/1/2009

$

7,500,000

West Ottawa Public Schools - Woodside Elementary

The project seeks to reconfigure the traffic flow and expand parking at Woodside Elementary. The district's current standard is to have a separate bus drop off zone, parent pick-up/drop-off zone and general parking areas thereby creating a safe environment for students, parents and the community. The current configuration for this building provides the desired "zones" but capacity significantly limits safe and June 2009 or efficient traffic flow. June 2010

September 2009 or September 2010

$

200,000

West Ottawa Public Schools - Glerum Elementary

The project seeks to reconfigure the traffic flow and expand parking at Glerum Elementary. The district's current standard is to have a separate bus drop off zone, parent pick-up/drop-off zone and general parking areas thereby creating a safe environment for students, parents and the community. The current configuration for this building does not provide the desired "zones" and current capacity is significantly June 2009 or limiting. June 2010

September 2009 or September 2010

$

250,000

Holland Township

West Ottawa Public Schools - North Holland Elementary

The project seeks to reconfigure the traffic flow and expand parking at North Holland Elementary. The district's current standard is to have a separate bus drop off zone, parent pick-up/drop-off zone and general parking areas thereby creating a safe environment for students, parents and the community. The current configuration for this building does not provide the desired "zones" and current capacity is significantly June 2009 or limiting based on demand. June 2010

September 2009 or September 2010

$

250,000

Holland Township

This project seeks to repaint the interior walls, trim and metal ceilings at Macatawa Bay Middle School. The building was last painted during a renovation in the early West Ottawa Public Schools - Macatawa Bay 1990's. The paint is showing its age with wear marks and dirt. The project is on the June 2009 or Middle School district's future capital project list for consideration. June 2010

September 2009 or September 2010

$

250,000

Holland Township

This project seeks to partially replace the carpet at Macatawa Bay Middle School installed in the early 1990's and partially replaced in 2004. The 1990's carpet is worn West Ottawa Public Schools - Macatawa Bay and is difficult to keep clean and odor free. The project is on the district's capital June 2009 or Middle School project list for consideration pending future funding. June 2010

September 2009 or September 2010

$

450,000

The project seeks to resurface the parking lots at Harbor Lights Middle School. The current condition of the asphalt is poor and creates driving hazards for automobiles June 2009 or and busses and walking hazards for students, staff and community. June 2010

September 2009 or September 2010

$

500,000

The project seeks to reconfigure the traffic flow and expand parking at Macatawa Bay Middle School. The district's current standard is to have a separate bus drop off zone, parent pick-up/drop-off zone and general parking areas thereby creating a safe environment for students, parents and the community. The current configuration for West Ottawa Public Schools - Macatawa Bay this building does not provide the desired "zones" and the current traffic flow is June 2009 or congested and raises safety concerns. June 2010 Middle School

September 2009 or September 2010

$

750,000

Holland Public Schools - District wide

Holland

Holland

Holland Township

Holland Township

Holland Township

02262009

itt

m b u

Holland Township

S West Ottawa Public School District

Project Name

Expected Completion Date

d e t

T O

-N

e u

q e R

West Ottawa Public Schools - Harbor Lights Middle School

s t s

P P A

Submitted Requests - Not Approved

O R 6/1/2011

Funding Request

Route (Infrastructure Only)

D VE

522 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District Holly Area School District

Project Name

Project Description

Expected Completion Date

Start Date

Holland Township

Macatawa Bay is one of the few middle schools fortunate enough to have a planetarium. The Minolta equipment was installed when the building was constructed in the early 1970's. The planetarium unit is in remarkable condition, but the console and presentation equipment became dated and non-functional. The district was able to make a basic replacement of the planetarium console, but did not have the resources to upgrade the presentation equipment. This proposal would allow the district to restore the planetarium once again making it a unique and destination West Ottawa Public Schools - Macatawa Bay community resource.. The planetarium hosts many district, township and community Middle School events. It is also used by the local astronomy club. 9/1/2009

P P A

O R 12/1/2009

Funding Request

D VE $

30,000

9/1/2010

$

10,850,000

West Ottawa Public Schools - High School Performing Arts Center

This project seeks to add a multi-purpose performing arts center to the district's high school campus. The performing arts center would be used for school related purposes, but would also serve as a venue for hosting community and regional cultural events. The PAC would also be used for college prep classrooms allowing August of 2009 students to experience a college lecture format prior to their college expereince. pending funding

Holland Township

West Ottawa Public Schools - New Elementary School

This project seeks to build a new elementary school building. The building would be located in an under served area of the district. The additional building would allow the district to relocate early childhood programming to a dedicated building and expand January 2010 early childhood options to better serve the community. pending funding

12/1/2010

$

13,700,000

Holly

Holly Area Schools Patterson Elementary

Replacement original classroom windors from the late 60's with energy efficient ones 6/1/2009

8/1/2009

$

100,000

Holly

Holly Elementary

10/30/2009

$

200,000

Holly

Holly Area Schools

Roof Replacement to increase insulation and replace a 30 year roof 8/1/2009 Voice over IP Phone System to upgrade the district's ability to communicate within the district and to our constiuents 4/1/2009

6/1/2009

$

300,000

Holly

Holly Area Schools

Roof Replacement to increase insulation and replace a 30 year roof

8/1/2009

10/30/2009

$

350,000

Holly

Holly Area Schools Patterson

8/1/2009

10/30/2009

$

350,000

Holly

Holly Area Schools

6/1/2009

8/1/2009

$

400,000

Holly

Holly Area Schools High School

Roof Replacement to increase insulation and replace a 30 year roof Create Wireless Computer Connections to allow for wireless computer connections throughout the buildings for student to learn without textbooks. Enhanced Energy Management System to upgrade efficiency of building environmental systems

7/1/2009

8/15/2009

$

300,000

Holly

Holly Area Schools

8/1/2009

12/31/2009

$

500,000

Holly

Holly Area Schools Patterson

Emergency Generator to sustain a shelter environment for students and community Parking Lot and Exterior Lighting to create safe and green spaces to enhance the building and neighborhood

8/1/2009

10/1/2009

$

800,000

Holly

Holly Area Schools

Security Cameras to create a safe environment for learning

4/1/2009

6/1/2009

$

200,000

7/1/2009

9/1/2009

$

1,000,000

8/1/2009

10/1/2009

$

200,000

7/2/2009

7/31/2009

$

80,000

7/2/2009

7/31/2009

$

100,000

7/15/2009

8/15/2009

$

170,000

Holland Township

tt i m

ub

Holly Holly

Holly Area Schools

S

Holly Area Schools

Holly Academy

Holly / Holly Twp.

Holly Academy

Holly / Holly Twp.

Holly Academy

Holly Academy

Holly / Holly Twp.

Holly Academy

02262009

Holly Academy

d e t

T O

s t s

-N

e u

q e R

District Wide Area Network to create a technolgy connection across the district to increase the ability to bring new educational opportunities to all students Parking Lot and Exterior Lighting to create safe and green spaces to enhance the building and neighborhood Replace exterior windows in Middle School building with energy efficient thermal tempored windows Replace exterior windows in Elementary building with energy efficient thermal tempored windows Duro Last roof with thermal insulation to replace decaying & leaking roof and to increase R value

Submitted Requests - Not Approved

Route (Infrastructure Only)

523 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Holton Public Schools Holton

Holton Public Schools; Holton High School

Holton Public Schools Holton

Holton Public Schools; Holton Middle School

Holton High School's Energy Restoration Project includes replacing 37 year old water boilers; heating pumps, and air handling units. This project targets installing new heating efficiency control systems, roof replacement with additional insulation, and installation of energy efficient exterior doors. 4/1/2009 Holton Middle School's Energy Restoration Project includes the installation of T-5 lighting fixtures. 6/1/2009

Holton Public Schools

Holton Public School's District Wide Restoration Project includes the installation high efficiency hot water system, energy efficient exterior doors and windows and the replacement of the roof with a metal standing seam system including attic insulation for the administrative offices. The project also includes the replacement of the forced air heating system with a hot water boiler system, installation of energy efficient exterior doors and lighting for the transportation facilities. 4/1/2009

Holton Public Schools: Holton Elementary

Holton Elementary School's Energy Restoration Project includes replacing the gas forced furnace system with hot water boilers, 20 year old unit ventilators and 22 year old boilers. This project targets installing new heating efficiency control systems, roof replacement with additional insulation, and installation of energy efficient exterior doors and windows. 5/1/2009

Montabella Community Schools, Montabella Elementary

Adding bathroom space to the building. Originally designed in 1980 with not enough bathroom capaicity, as such we will be adding capacity through additional space and renovating some existing space 1/15/2009

Montabella Community Schools, Montabella Junior/Senior High

We are looking to add 2 permanent classrooms to the Junior/Senior High if we cannot add the entire wing. We have spoke with our architect about this already and our only other option is adding portable classrooms. 7/1/2009

1,799,992

$

12,000

9/1/2009

$

237,000

9/1/2009

$

781,000

4/15/2009

$

350,000

6/1/2010

$

550,000

Montabella Community Schools, Montabella Junior/Senior High

Our building was designed with three classrooms wings, but built specifically for a fourth identical wing to be added. Upon consolidation of school buildings this year we have decided to build that fourth wing, with 4 classrooms, one prep area, and two bathrooms. If we cannot make this happen financially as a brick and morter project we will be forced to add portable classroom space instead to alieviate the stresses of adding 2 grade levels to the building. 7/1/2009

8/15/2010

$

1,300,000

Hopkins

Hopkins School District

Upgrade all file servers in district as well as classroom technology to allow for interactive use by students and faculty allowing real world applications to be brought into classroom 6/8/2009

12/31/2009

$

275,000

Hopkins township

Hopkins Public Schools, Hopkins Elementary Renovate existing kitchen to bring up to code and to make it more energy efficient

6/8/2009

8/31/2009

$

78,000

6/8/2009

8/31/2010

$

51,000

6/8/2009

8/31/2009

$

125,000

6/8/2009

8/31/2009

$

125,000

Hopkins Public Schools, Hopkins Elementary Removal of asbestos floor tile from coatrooms, cafeteria and science areas in building 6/8/2009

8/31/2009

$

20,000

Hopkins Public Schools, Hopkins Elementary Replace existing water cooled units with energy efficient freezer/coolers

6/8/2009

8/31/2009

$

55,000

Holton Public Schools Holton Montabella Community Schools Home Township Montabella Community Schools Home Township

Montabella Community Schools Home Township

Hopkins Public Schools Hopkins Public Schools Hopkins Public Schools Hopkins Public Schools Hopkins Public Schools Hopkins Public Schools Hopkins Public Schools Hopkins Public Schools

Hopkins township Hopkins township

N s

t s e

qu

e R

replace current electrical transformer at school building to incorporate all fields and Hopkins Public Schools, Hopkins Elementary outbuildinds running through one transfer to help reduce energy costs Upgrade all outdoor bleachers to current code to improve visibility, sight lines and Hopkins Public Schools, High School safety Replace existing equipment to be age appropriate playground equipment and Hopkins Public Schools, Hopkins Elementary equipment which can be integrated into phys. Ed. Curriculum.

tt i m

Hopkins township

S

7/31/2009

O R

P P A

ub

Hopkins township

Hopkins township

d e t

T O

9/1/2009

Funding Request

$

Holton Public Schools Holton

Hopkins Public Schools Hopkins Public Schools

Expected Completion Date

D VE

Hopkins township

Hopkins School District

Install fiber cable throughout district to allow for connectivity between buildings and greater bandwidth and speed of communication and data transfer

6/8/2009

12/31/2009

$

75,000

Hopkins township

Hopkins Public Schools, High School

build concession stand and bathroom facilities at new baseball and softball field

6/8/2009

10/31/2009

$

212,000

Hopkins township

Hopkins Public Schools, High School

resurface of district track facility

7/1/2009

10/31/2009

$

85,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

524 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Houghton Lake Community Schools Houghton Lake Houghton Lake Community Schools Houghton Lake Houghton Lake Community Schools Houghton Lake

Houghton Lake Community Schools Houghton Lake Community Schools Houghton Lake Community Schools Houghton Lake Community Schools Houghton Lake Community Schools Houghton Lake Community Schools Houghton Lake Community Schools Houghton Lake Community Schools

Project Name Houghton Lake Community Schools - Collins Elementary Houghton Lake Community Schools - Middle School Houghton Lake Community Schools - High School

Houghton Lake Houghton Lake Houghton Lake

Houghton Lake Community Schools Transportation Houghton Lake Community Schools - Middle School Houghton Lake Community Schools - Collins Elementary Houghton Lake Community Schools - High School

Houghton Lake Houghton Lake Houghton Lake Houghton Lake

8/15/2009

$

216,000

6/15/2009

8/15/2009

$

234,000

6/15/2009

8/15/2009

$

720,000

$

525,000

8/31/2010

$

1,920,000

9/15/2009

8/31/2010

$

2,080,000

9/15/2009

8/31/2010

$

6,400,000

6/30/2009

$

40,000

8/31/2010

$

440,000

8/31/2010

$

550,000

8/31/2010

$

660,000

6/1/2009

8/1/2009

$

270,000

6/9/2009

8/9/2009

$

375,000

indoor practice space

6/1/2009

12/30/2009

$

160,200

Replace roof

6/1/2009

12/30/2009

$

180,000

Build new gym; add conference and interant staff room

6/1/2009

12/30/2009

$

405,000

Build new library and computer lab Replace 48 year old deteriorating wooden light poles and twenty-two year old light fixtures with new greening technology efficiencies

6/1/2009

12/30/2009

$

838,000

4/1/2009

6/1/2009

$

125,000

8/2/2009

$

107,000

T O

Hudson Area Schools Hudson Hudson Area Schools Hudson

Hudson Area Schools Athletic Department Hudson Area Schools, Middle and High School Level

Hudson Area Schools Hudson

Hudson Area Schools, Elementary Level

Hudson Area Schools Hudson Ida Public School District Ida

Hudson Area Schools, Elementary Level

tt i m

Light poles

d e t

Ida Elementary

S

-N

e u

q e R

ub

Ida

s t s

O R

P P A 9/15/2009

SAFETY/SECURITY - Replace antiquated bus radio system to digital radios with GPS capability. This will increase communication range and oversight of bus travel 6/15/2009 SAFETY/SECURITY - Reorientation of middle school offices and entryway to promote better security/visibility of foot traffic 9/15/2009 SAFETY/SECURITY - Reorientation of Collins elementary offices and entryway to promote better security/visibility of foot traffic 9/15/2009 SAFETY/SECURITY - Reorientation of high school offices and entryway to promote better security/visibility of foot traffic 9/15/2009

the howell schools school bldg of howell high school,northwest elementary &high school fieldhouse boiler replacements howell public schools:the howell high school and voyager elementary chillers and cooling towers

Howell Public Schools Howell, MI

Funding Request

6/15/2009

Houghton Lake Community Schools Administration and Technology Facility Houghton Lake Community Schools - High School ENERGY SAVINGS - Install new geothermal mechanical system to building Houghton Lake Community Schools - Collins Elementary ENERGY SAVINGS - Install new geothermal mechanical system to building Houghton Lake Community Schools - Middle School ENERGY SAVINGS - Install new geothermal mechanical system to building

Houghton Lake

Imlay City

Start Date

GEOGRAPHIC CONSOLIDATION - Relocated central administration building and technology hub to main campus. This will cut down on travel between sights and also allow for the construction of a "green" facility to replace the inefficient existing structure. Structure to be approximately 3,000 square feet 9/15/2009

Howell Public Schools Howell, MI

Ida Public School District Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools

Project Description ENERGY SAVINGS - Upgrade lighting system to gain efficiency; add occupancy sensors to reduce unnecessary use ENERGY SAVINGS - Upgrade lighting system to gain efficiency; add occupancy sensors to reduce unnecessary use ENERGY SAVINGS - Upgrade lighting system to gain efficiency; add occupancy sensors to reduce unnecessary use

Expected Completion Date

Implementing all day kindergarten, must renovate 4 existing bathrooms by adding stalls and fixtures to accommodate increase in students, remodeling 6 classrooms for additional students, 6/26/2009

7/15/2010

D VE

Imlay City Community Schools Weston Elem Update windows and exterior doors to provide energy savings

4/1/2009

7/31/2009

$

115,000

Imlay City Community Schools Middle School Update windows to provide energy savings

5/1/2009

7/31/2009

$

25,000

Imlay City Community Schools High School

Update windows to provide energy savings

5/1/2009

7/31/2009

$

25,000

Imlay City

Imlay City Community Schools All School

Replace outside parking lot lighting for safety and energy efficiency

3/1/2009

7/31/2009

$

57,600

Imlay City

Imlay City Community Schools All School

Seal and replace needed brick to achieve energy savings on all school buldings

4/1/2009

6/30/2009

$

60,000

Imlay City Imlay City

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

525 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools Imlay City Community Schools

Location City or Township Imlay City

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

4/1/2009

7/31/2009

$

95,000

Imlay City

Imlay City Community Schools Borland Elem Update windows and exterior doors to provide energy savings Imlay City Community Schools Venture Alternative High School Reinsulate walls to provide for energy savings

6/15/2009

8/31/2009

$

40,000

Imlay City

Imlay City Community Schools High School

5/1/2009

7/31/2009

$

55,000

Imlay City

Imlay City Community Schools Middle School Remodel classrooms to increase efficiency

6/15/2009

8/31/2009

$

60,000

Imlay City

Imlay City Community Schools Weston Elem Remodel classrooms to increase efficiency

6/15/2009

$

384,000

Imlay City

Imlay City Community Schools Borland Elem Remodel classrooms to increase efficiency

6/15/2009

8/31/2009

$

480,000

Imlay City

Imlay City Community Schools Middle School Update exterior & interior doors to provide energy savings

5/1/2009

7/31/2009

$

55,000

Imlay City

Imlay City Community Schools High School

6/15/2009

8/31/2009

$

72,000

Imlay City

Imlay City Community Schools Middle School Remodel and replace bathroom fixtures

6/15/2009

8/31/2009

$

96,000

Imlay City

Imlay City Community Schools Borland Elem Remodel and replace bathroom fixtures Imlay City Community Schools Borland & Weston Elementaries Electric upgrades in classrooms to provide for needs of technology Imlay City Community Schools Middle & High Schools Electric upgrades in classrooms to provide for needs of technology

6/15/2009

8/31/2009

$

192,000

6/15/2008

8/31/2008

$

60,000

6/15/2008

8/31/2008

$

60,000

Imlay City Imlay City

A T

Remodel and replace bathroom fixtures

s

st

O N

PP

O R 8/31/2009

D VE

6/15/2008

8/31/2008

$

220,000

Imlay City

Imlay City Community Schools Weston Elem Replace heating/cooling ventilators and condensing unit to provide energy savings Imlay City Community Schools All School Buildings Roofing repairs to prevent energy loss through roofs

6/15/2009

8/31/2009

$

250,000

Imlay City

Imlay City Community Schools Weston Elem Remodel and replace bathroom fixtures

6/15/2009

8/31/2009

$

95,000

Imlay City Community Schools Borland Elem. replace carpeting in hallways and classrooms

6/15/2009

8/31/2009

$

90,000

Replace (3) Unit Heaters

6/1/2009

8/1/2009

$

30,000

Expand Wood Shop built in 1962

6/1/2009

8/1/2009

$

40,000

Replace (4) Unit Heaters

6/1/2009

8/1/2009

$

40,000

Replace carpet from 1996

6/1/2009

8/1/2009

$

40,000

Inland Lakes Schools

Imlay City Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp

Inland Lakes Schools

Remove Vacant Delapidated Bus Garage and Replace With a Storage Facility

6/1/2009

8/1/2009

$

65,000

Inland Lakes Schools

Indian River, Tuscarora Twp

Inland Lakes Middle School

Energy Conservation lighting upgrade from T-12 to T-8 lighting and incandescent lights to high pressure sodium and associated celing repair/replacement

6/1/2009

8/1/2009

$

70,000

Inland Lakes Schools

Renovate/Repair Administrative Office including new roof, windows, carpet and heating/cooliing and electrical. Office is falling apart (was former bus "garage")

6/1/2009

8/1/2009

$

70,000

Inland Lakes Middle School

Replace carpet from 1989

6/1/2009

8/1/2009

$

100,000

Inland Lakes High School

Replace carpet from 1989 Replace bathroom sinks with low flow sensor faucets; original toilets with dual flush toilets

6/1/2009

8/1/2009

$

100,000

6/1/2009

8/1/2009

$

120,000

Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools

Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools

Imlay City

Update exterior & interior doors to provide energy savings

Inland Lakes High School

S

e t t

Inland Lakes Middle School

it

Inland Lakes Elementary School

Inland Lakes Middle School

eq

R d

Inland Lakes High School

m b u

Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp

02262009

e u

Submitted Requests - Not Approved

Route (Infrastructure Only)

526 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Inland Lakes Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Cheboygan Area Schools Ionia Public Schools Ionia Public Schools

Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp Indian River, Tuscarora Twp

Project Name

Project Description

Inland Lakes High School

Energy Conservation lighting upgrade from T-12 to T-8 lighting and incandescent lights to high pressure sodium and associated celing repair/replacement Replace bathroom sinks with low flow sensor faucets; original toilets with dual flush toilets, original shower heads with sensor heads

Inland Lakes Middle School

Replace all siding

6/1/2009

8/1/2009

Inland Lakes High School

6/1/2009

8/1/2009

Inland Lakes High School

Replace all siding Replacement of exterior windows of plate glass with energy efficient Kalwall and double pane thermal tempered windows

Inland Lakes High School

Extend the wall by 40' to enlarge the HS Library into a true media center

Inland Lakes Middle School

Roof replacement of 1962 roof to increase R value with thermal insulation

Inland Lakes High School

Inland Lakes High School

200,000

$

280,000

8/1/2009

$

300,000

6/1/2009

8/1/2009

$

450,000

8/1/2009

$

459,000

Inland Lakes High School

Roof replacement of 1962/1989 roof to increase R value with thermal insulation 6/1/2009 Extend the cafeteria built in 1962 by 40' and add a kitchen to eliminate transfer of food from Middle School Kitchen to High School 6/1/2009

8/1/2009

$

500,000

Inland Lakes Middle School

Expand/Upgrade PA System for Middle/High School

6/1/2009

8/1/2009

$

50,000

Inland Lakes Elementary School

Replace Telephone System from 1997 (wiring from 1962)

6/1/2009

8/1/2009

$

50,000

Inland Lakes High School

Replace Telephone System from 1997 (wiring from 1962)

6/1/2009

8/1/2009

$

50,000

Inland Lakes Elementary School

Install Video Camera Security System

6/1/2009

8/1/2009

$

70,000

Inland Lakes High School

Install Video Camera Security System

6/1/2009

8/1/2009

$

70,000

Repave and additional layer to parking lot

6/1/2009

8/1/2009

$

100,000

Upgrade and addition of wiring for technology/networks

6/1/2009

8/1/2009

$

175,000

Upgrade and addition of wiring for technology/networks

6/1/2009

8/1/2009

$

175,000

EXTERIOR DOOR REPLACEMENT

6/1/2009

8/31/2010

$

15,000

RENOVATE UNDER WINDOW EXTERIOR

6/1/2009

8/31/2010

$

20,000

AC IN COMPUTER LAB

6/1/2009

8/31/2010

$

5,000

REPLACE EXHAUST FAN UNITS

6/1/2009

8/31/2010

$

8,000

ASBESTOS TILE REMOVAL & NEW FLOOR 6/1/2009 Renovate bathrooms to meet current ADA and LEED codes. 7/9/2009 Purchase and installation of wind generation equipment 7/9/2009 Geothermal mechanical system for all schools including installation of central air condition Sept. 09 HVAC upgrade-fans in 2nd story classrooms at Jefferson Elementary & Middle Schoo for improved energy efficiency 7/9/2009 Demolish existing house at expand parking at Middle School creating safer access for parents and community members 7/9/2009 Purchase and demolish house for additional parking at Jefferson Elementary creating safer access for parents and community members 7/9/2009

8/31/2010 12/9/2009 12/9/2009

$ $ $

12,000 1,800,000 2,000,000

9/10/2009

$

19,500,000

12/9/2009

$

50,000

12/9/2009

$

140,000

12/9/2009

$

250,000

Inland Lakes Schools Inland Lakes High School

Ionia Public Schools

Ionia

Ionia Public Schools

Ionia Public Schools

Ionia

Ionia Public Schools

Ionia Public Schools

Ionia

Ionia Public Schools

tt i m

d e t

s t s

T O

-N

e u

q e R

Ionia Public Schools

02262009

D VE $

Ionia

S

8/1/2009

Submitted Requests - Not Approved

O R

6/1/2009

P P A 6/1/2009

8/1/2009

Route (Infrastructure Only)

147,000

200,000

ub

INVERNESS TOWNSHIP

6/1/2009

$

$

Ionia Public Schools

INVERNESS TOWNSHIP

8/1/2009

150,000

INVERNESS TOWNSHIP Ionia Ionia

INVERNESS TOWNSHIP

6/1/2009

Funding Request

$

Inland Lakes Middle School CHEBOYGAN AREA SCHOOL INVERNESS ELEM CHEBOYGAN AREA SCHOOL INVERNESS ELEM CHEBOYGAN AREA SCHOOL INVERNESS ELEM CHEBOYGAN AREA SCHOOL INVERNESS ELEM CHEBOYGAN AREA SCHOOL INVERNESS ELEM Ionia Public Schools Ionia Public Schools

INVERNESS TOWNSHIP

Start Date

Expected Completion Date

527 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Ionia Public Schools Ionia Ionia Public Schools Ionia

Project Name Ionia Public Schools Ionia Public Schools

Project Description Electronic signs at all buildings Roof replacements at Boyce, Rather & Twin Rivers

Start Date 7/9/2009 7/9/2009

Expected Completion Date Funding Request 12/9/2009 $ 400,000 12/9/2009 $ 720,000

Ionia Public Schools Ionia Public Schools Ionia Public Schools Ionia Public Schools

Ionia Ionia Ionia Ionia

Ionia Public Schools Ionia Public Schools Ionia Public Schools Ionia Public Schools

7/9/2009 7/9/2009 7/9/2009 7/9/2009

12/9/2009 12/9/2009 12/9/2009 12/9/2009

Ionia Public Schools

Ionia

Ionia Public Schools

Retaining wall renovation at Jefferson Elementary School and Middle School Playground equipment for student safety Parking lot replacements as needed through out district Carpeting and tile flooring through out district Mechanical system upgrade for large backup generators for Red Cross or Homeland Security emergencies.

Sept. 09

12/9/2009

Ionia Public Schools

Ionia City

Ionia Public Schools

Ionia Public Schools Ionia Public Schools Ionia Public Schools Ionia Public Schools Ionia Public Schools

Ionia City Ionia Township Ionia Township Ionia Township Ionia Township

Ionia Public Schools Ionia Public Schools Ionia Public Schools Ionia Public Schools Ionia Public Schools

Ionia Public Schools Ionia Public Schools

Ionia Township Ionia Township

Ionia Public Schools Ionia Public Schools

Ionia Public Schools Ionia Public Schools Ionia Public Schools

Ionia Twp Ionia Twp Ionia Twp

Ionia Public Schools Ionia Public Schools Ionia Public Schools

Ionia Public Schools Ionia Public Schools Anchor Bay School District

Ionia Twp Ionia Twp Ira Township

West Iron County Public Schools West Iron County Public Schools

T O

1,500,000

$

160,000

12/9/2009 12/9/2009 12/9/2009 12/9/2009 6/10/2009

$ $ $ $ $

750,000 25,000 50,000 175,000 1,800,000

Sept. 09 Sept. 09

Sept. 11 Sept. 11

$ $

15,000,000 27,000,000

P P A

O R 12/9/2009

7/9/2009 7/9/2009 7/9/2009

12/9/2009 12/9/2009 12/9/2009

$ $ $

25,000 40,000 100,000

Ionia Public Schools Ionia Public Schools

7/9/2009 Sept. 09

12/9/2009 9/10/2009

$ $

1,800,000 11,025,000

Anchor Bay School District High School

Bus loop replacement

4/7/2009

10/6/2009

$

85,000

1. The present Middle School was built in 1928. The infrastructure (steam line, electric, water lines) have been repaired in the past but are not cost effective and becoming unrepairable without a complete new system installed. The new project would be a 12 classroom addition to the present High School along with an auditorium and gymnasium. This would allow us to move the present Middle School children to the High School therefore allowing the Middle School children access to High School curriculum which is not offered to these students at the present time. 6/1/2009

12/1/2009

$

4,000,000

6. Replace sewer line in the Stambaugh Elementary building

9/1/2009

$

200,000

$

6,870,000

d e t

Iron River

West Iron County Public Schools

02262009

$

D VE

Construction of new Performing Arts Center for High School with 1,000 seats Construction of a new Middle Schoo Roof top air conditioner for Data Center Uninterruptable Power Supply equipment for safety of technology equipment. Construct a salt storage enclosure Install underground irrigation system at High Schoo Construction of an Alternative Education school to improve employability skills & improve instruction in math & science. Elementary school to replace Rather

West Iron County Public Schools

tt i m

s t s

-N

e u

q e R

6/1/2009

Ironwood Area Schools

Erecting, furnishing and equipping an addition to the high school building; partially remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; purchasing school buses, and developing and improving playgrounds, play fields, athletic facilities and sites.

JPS McCulloch Elementary

Replace classroom lighting

7/1/2009

12/31/2009

$

32,960

JPS Firth Alternative Middle School

Replace classroom lighting

7/1/2009

12/31/2009

$

37,080

JPS Cascades Elementary

Replace classroom lighting

7/1/2009

12/31/2009

$

41,200

JPS Frost Elementary

Replace classroom lighting

7/1/2009

12/31/2009

$

41,200

JPS Sharp Park Elementary

Replace classroom lighting

7/1/2009

12/31/2009

$

41,200

ub

S

750,000 1,000,000 1,200,000 1,260,000

Restoration of decaying parapet walls at elementary schools that were built in 1922 7/9/2009 Classroom & hallway doors with computer managed locking system for student safety and security. 7/9/2009 Air handling equipment in bus wash bay to reduce condensation Sept. 09 Automatic wash brushes in school bus wash bay Sept. 09 Enclosed canopy over school buses Sept. 09 Construction of a new multi-purpose room for High Schoo Sept. 09

Iron River

Ironwood Area Schools Ironwood Jackson Public Schools Jackson Jackson Public Schools Jackson Jackson Public Schools Jackson Jackson Public Schools Jackson Jackson Public Schools Jackson

$ $ $ $

Submitted Requests - Not Approved

Route (Infrastructure Only)

528 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Jackson Public Schools Jackson Public Schools Jackson Public Schools East Jackson Community Schools Swan Valley School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Jackson

JPS Bennett Elementary

Replace classroom lighting

7/1/2009

12/31/2009

$

55,620

Jackson

JPS Hunt Elementary

Replace classroom lighting

7/1/2009

12/31/2009

$

111,240

Jackson

JPS Middle School at Parkside

12/31/2009

$

296,640

Jackson

East Jackson Community Schools

Replace classroom lighting 7/1/2009 Replace roofs, purchase technology, upgrade lighting, install solar collector, purchase buses

$

995,000

James Township

Swan Valley-Shields Elem.

PP

2/16/2009

$

300,000

2/16/2009

$

68,700

1/26/2009

2/16/2009

$

400,000

1/26/2009

2/16/2009

$

549,600

7/27/2009

7/27/2010

$

5,789,506

O R

6/1/2009

9/1/2009

D VE

Jenison Public Schools Jenison

JPS Classroom Equipment I

Equip all classrooms with data projectors and document cameras.

1/26/2009

Jenison Public Schools Jenison

JPS Equipment - Staff

Equip all teachers with iPod touches

1/26/2009

Jenison Public Schools Jenison

JPS Classroom Equipment II

Equip all classrooms with interactive whiteboard systems.

Jenison Public Schools Jenison

JPS Equipment - Students

Equip all secondary students

Jenison Public Schools Jenison

Early Childhood Center

Build an Early Childhood Center - Approx 35,680 square feet

Jenison Public Schools Jenison

Wireless Infrastructure

Build wireless network infrastructure for each district owned building.

1/26/2009

2/16/2009

$

500,000

Jenison Public Schools Jenison

JPS Computer Infrastructure

Servers District Wide

1/26/2009

2/16/2009

$

45,000

Jenison Public Schools Jenison

Media Center Books

Purchase books for media centers - District wide

1/26/2009

2/16/2009

$

200,000

Jenison Public Schools Jenison

JPS Professional Development

2/16/2009

$

202,500

Jenison Public Schools Jenison

Technology Integration Specilists

Funding for 9 days of tech staff development per staff per year 1/26/2009 10 Technology integration specials - teacher/trainers to work with staff on technology initiatives 1/26/2009

2/16/2009

$

750,000

Jenison Public Schools Jenison

JPS Student Computer Labs

Replace aging computer labs for student use

1/26/2009

2/16/2009

$

854,000

Jenison Public Schools Jenison

Carpet Replacement

Replace carpet in classrooms - district wide

1/26/2009

2/16/2009

$

1,887,385

Jenison Public Schools Jenison Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo

Roof Replacement

Replace roofs - district wide

1/26/2009

2/16/2009

$

2,359,229

Replace existing windows with energy efficient window wall system

6/15/2009

9/1/2010

$

330,400

Replace existing boilers with energy efficient boilers

6/15/2009

9/1/2010

$

510,608

Replace existing windows with energy efficient window wall system Replace one 6 year old computer lab with new computers and energy efficient flat screen monitors Replace one 6 year old computer lab with new computers and energy efficient flat screen monitors Replace one 6 year old computer labs with new computers and energy efficient flat screen monitors Replace one 6 year old computer labs with new computers and energy efficient flat screen monitors Replace one 6 year old computer labs with new computers and energy efficient flat screen monitors Replace one 6 year old computer labs with new computers and energy efficient flat screen monitors

6/15/2009

9/1/2010

$

862,400

7/15/2009

8/31/2010

$

37,200

7/15/2009

8/31/2010

$

37,200

7/15/2009

8/31/2010

$

37,200

7/15/2009

8/31/2010

$

37,200

7/15/2009

8/31/2010

$

37,200

7/15/2009

8/31/2010

$

37,200

02262009

e t t

Kalamazoo Public Milwood Middle

m b u

Kalamazoo Public Lincoln Elementary Kalamazoo Public Arcadia Elementary

S

O N

R d

Kalamazoo Public Milwood Elementary

it

st

e u

eq

s

A T

Kalamazoo Public Woodward Elementary Kalamazoo Public Maple Street Magnet Middle Kalamazoo Public Milwood MS Kalamazoo Public Northglade Elementary Kalamazoo Public Spring Valley Elementary

Submitted Requests - Not Approved

Route (Infrastructure Only)

529 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District

Location City or Township

Project Name

Kalamazoo

Kalamazoo Public Lincoln Elementary

Kalamazoo

Kalamazoo Public Washington Elementary

Kalamazoo

Kalamazoo Public Woods Lake Elementary

Project Description Replace two 6 year old computer labs with new computers and energy efficient flat screen monitors Replace two 6 year old computer labs with new computers and energy efficient flat screen monitors Replace two 6 year old computer labs with new computers and energy efficient flat screen monitors

Kalamazoo

Kalamazoo Public Arcadia Elementary

Kalamazoo

Start Date

Expected Completion Date

Funding Request

7/15/2009

8/31/2010

$

74,400

7/15/2009

8/31/2010

$

74,400

7/15/2009

8/31/2010

$

74,400

Replace existing boiler with energy efficient boiler

6/15/2009

10/1/2009

$

165,000

Kalamazoo Public Northglade Elementary

Replace existing boiler with energy efficient boiler

6/15/2009

$

165,340

Kalamazoo

Kalamazoo Public Vine Street Elementary

$

208,320

Kalamazoo Public Loy Norrix HS

8/31/2010

$

260,400

Kalamazoo

Kalamazoo Public Woods Lake Elementary

6/15/2009

9/1/2010

$

363,552

Kalamazoo

Kalamazoo Public Elementary Teachers

Replace existing windows with energy efficient window wall system Replace 350 6 year old elementary teacher computers with new computers and energy efficient flat screen monitors

PP

9/1/2009

Kalamazoo

Replace existing wood windows with energy efficient window system 6/15/2009 Replace seven 6 year old computer labs with new computers and energy efficient flat screen monitors 7/15/2009

7/15/2009

8/31/2010

$

420,000

Kalamazoo

Kalamazoo Public Washington Elementary

Replace existing windows with energy efficient window wall system

6/15/2009

9/1/2010

$

453,600

Kalamazoo

Kalamazoo Public Arcadia Elementary

Replace existing HVAC system with energy efficient HVAC system

6/15/2009

10/1/2009

$

588,000

Kalamazoo

Kalamazoo Public Northglade Elementary

Replace existing windows with energy efficient window wall system

6/15/2009

9/1/2010

$

588,000

Kalamazoo

Kalamazoo Public Woods Lake Elementary

Replace existing boilers with energy efficient boilers

6/15/2009

9/1/2010

$

591,150

Kalamazoo

Kalamazoo Public Woods Lake Elementary

Replace existing heating system with energy efficient HVAC system

6/15/2009

9/1/2010

$

1,101,240

Kalamazoo

Kalamazoo Public Edison Elementary

6/15/2009

9/1/2010

$

1,167,600

Kalamazoo

Kalamazoo Public Greenwood Elementary

7/15/2009

8/31/2010

$

45,500

Kalamazoo

Kalamazoo Public Winchell Elementary

7/15/2009

8/31/2010

$

48,000

Kalamazoo

Kalamazoo Public Phoenix Alt HS

7/15/2009

8/31/2010

$

50,000

Kalamazoo

Kalamazoo Public Vine Elementary Kalamazoo Public Parkwood Upjohn Elementary

Replace existing windows with energy efficient window wall system Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control)

7/15/2009

8/31/2010

$

60,000

7/15/2009

8/31/2010

$

62,000

7/15/2009

8/31/2010

$

70,000

7/15/2009

8/31/2010

$

76,000

7/15/2009

8/31/2010

$

84,000

7/15/2009

8/31/2010

$

87,500

7/15/2009

8/31/2010

$

90,000

7/15/2009

8/31/2010

$

99,000

7/15/2009

8/31/2010

$

105,000

m b u

Kalamazoo

Kalamazoo Public Milwood Elementary

Kalamazoo Kalamazoo Kalamazoo Kalamazoo

Kalamazoo Public Woods Lake Elementary

S

Kalamazoo Public Washington Elementary Kalamazoo Public Spring Valley Elementary Kalamazoo Public Northglade Elementary

Kalamazoo

Kalamazoo Public Arcadia Elementary

Kalamazoo

Kalamazoo Public Woodward Elementary

02262009

eq

O N

R d

e t t

it

Kalamazoo

e u

st

s

A T

Submitted Requests - Not Approved

O R 10/1/2009

D VE

Route (Infrastructure Only)

530 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Kalamazoo Public School District Kalamazoo Kalamazoo Public School District Kalamazoo Comstock Public Schools Kalamazoo Township Comstock Public Schools Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District

Excelsior Township S/D #1 Kent City Community Schools Kent City Community Schools Kent City Community Schools Kent City Community Schools

Kent City Community Schools Kent City Community Schools Kent City Community Schools Kent City Community Schools Kent City Community Schools

Project Name Kalamazoo Public Lincoln Elementary Kalamazoo Public Loy Norrix HS Comstock Public Schools - Alternative High School

Kalamazoo Township

Comstock Public Schools - Alternative High School

Kalamazoo twp

Kalamazoo Public Kalamazoo Central HS

Kalamazoo twp Kalamazoo twp

Kalamazoo Public Indian Prairie Elementary Kalamazoo Public MLKing-Westwood Elementary

Kalamazoo twp

Kalamazoo Public Hillside Middle

Project Description Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data projectors, audio enhancement, document camera,amplifier,switch,control) Replace energy inefficient boiler and HVAC system with high efficiency heating and control system.

Replace existing windows with energy efficient window wall system Replace existing heating system with energy efficient HVAC system

Kalamazoo twp Kalamazoo twp Kalamazoo twp

T O

8/31/2010

$

150,500

7/15/2009

1/30/2010

$

300,000

9/1/2001

9/1/2010

$

500,000

$

3,000,000

$

148,800

9/1/2010

$

520,800

6/15/2009

9/1/2010

$

798,000

6/15/2009

9/1/2010

$

5,237,000

7/15/2009

8/31/2010

$

52,500

7/15/2009

8/31/2010

$

115,500

7/15/2009

8/31/2010

$

155,000

7/15/2009

8/31/2010

$

450,000

s t s

12/30/2009

$

300,000

6/15/2009

This is a one room schoolhouse that is over 100 years old. We would insulate and rewire our building in order to reduce energy costs. A new heating and cooling system would allow us to be more energy efficient. The bathrooms are in desperate need of updating. More water efficient toilets and faucets would be purchased and installed. For technology, we would put in 3 access points, 10 data drops, 2 routers and a switch to connect the access points and data drops back to the router. 7/1/2009

e u

eq

9/1/2010

O R

P P A

-N

Funding Request

7/15/2009

Remodel and replace the electrical system to install a high efficiency electrical service. In addition to the electrial service replacement, we would install solar panels and wind turbines. 9/1/2001 Replace four 6 year old computer labs with new computers and energy efficient flat screen monitors 7/15/2009

Construct a 26,000 square foot addition. Purchase and install classroom audio/visual package (ceiling mounted data Kalamazoo Public Indian Prairie Elementary projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data Kalamazoo Public Northeastern Elementary projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data Kalamazoo Public King Westwood Elementary projectors, audio enhancement, document camera,amplifier,switch,control) Purchase and install classroom audio/visual package (ceiling mounted data Kalamazoo Public Kalamazoo Central HS projectors, audio enhancement, document camera,amplifier,switch,control)

Kalamazoo twp

Start Date

Expected Completion Date

8/31/2010

D VE

Kalkaska

Excelsior District #1

Kent City

Modify lighting master controls, add motion sensors where appropriate 4/1/2009 Replace single pane windows with energy efficeint multi-pane windows in 4 -5 grade wing 4/1/2009

8/20/2009

$

7,000

Kent City

Kent City Community Schools Kent City Community Schools, Elementry School

8/20/2009

$

30,000

Kent City

Kent City Community Schools, High School

8/20/2009

$

70,000

Kent City

Kent City Community Schools, High School

Replace single pane windows with energy efficeint multi-pane windows 4/1/2009 Replace light fixtures in the school (classrooms, hallways, cafeteria, gymnasium) with new energy efficient fixtures 4/1/2009

8/20/2009

$

105,000

Kent City Community Schools, High School

Replace HVAC system components at the High School. Boilers, rooftop units, flush and clean each boiler piping loop, in classrooms, hallways, gymnasium and auditorium including variable frequency drives to large pumps and motors. 5/1/2009

10/1/2009

$

215,000

Kent City Community Schools, Elementry School Kent City Community Schools, Elementry School

Redesign, reduce number of and replace light fixtures in the school including adding battery packs to emergency night lights fixtures and switches. Currently the are on 24/7 6/6/2009 Replace HVAC system components at the Elementary School. Boilers, rooftop units and univents 6/6/2009

8/20/2009

$

60,000

10/1/2009

$

275,000

Install wind turbine(s) for electricty generation, and develop educational program around energy savings, "green" class (conservation and life style) for life long impact. 4/1/2009

11/1/2009

$

410,000

Install drop ceiling ing classroom with high ceilings and relace lights in those rooms.

8/20/2009

$

40,000

Kent City Kent City

Kent City Kent City

02262009

e t t

it

m b u

Kent City

S

R d

Kent City Community Schools Kent City Community Schools, Elementry School

Submitted Requests - Not Approved

6/6/2009

Route (Infrastructure Only)

531 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kentwood Public Schools North Huron School District Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools

Project Description

Start Date

Kentwood

Kentwood - EKHS

Renovation of existing school field house and adjacent locker rooms. Project includes upgrade to all mechanical and electrical equipment to maximize energy efficiency. Update to current building codes, consistent with the balance of building. Upgrade all seating and supporting facilities to be ADA compliant. 1/1/2010

Kinde

North Huron

elementary window replacement

9/1/2009

5/1/2009

Kingsford

Breitung Twp Schools

Replace light fixtures w/T-5's in the woodshop

2009

2009

Kingsford

Breitung Twp Schools

42 high efficiency electric hot water heaters

2009

Kingsford

Breitung Twp Schools

Compressor unit for walk-in cooler & freezer in middle school kitchen

Kingsford

Breitung Twp Schools

High efficiency variable speed motors for air handling units (5)

Kingsford

Breitung Twp Schools

1 air compressor for heating system

Kingsford

Breitung Twp Schools

64 unit high efficiency ventilator motors

Kingsford

Breitung Twp Schools

Replace light fixtures w/T-5's in 38 high school classrooms

Kingsford

Breitung Twp Schools

Replace light fixtures w/T-5's in 42 middle school classrooms

Kingsford

Breitung Twp Schools

Kingsford

D VE

4,000,000

$

250,000

$

9,000

$

11,500

2009

$

12,000

2009

2009

$

17,500

2009

2009

$

18,000

2009

2009

$

29,400

2009

2009

$

93,000

2009

2009

$

102,900

Install new T-5 light fixtures in classrooms & hallways

2009

2009

$

110,000

Breitung Twp Schools

Replace restroom stalls in middle school (9)

2009

2009

$

7,500

Kingsford

Breitung Twp Schools

Replace a portion of service road

2009

2009

$

14,000

Kingsford

Breitung Twp Schools

Replace rubber membrane and add insulation to flat roof system 156,700 square feet 2009

2009

$

400,000

Kingsford

Breitung Twp Schools

3 recirculating hot water pumps and timer controls

2009

2009

$

3,800

Kingsford

Breitung Twp Schools

Air compressor for heating system

2009

2009

$

22,000

Kingsford

Breitung Twp Schools

Replace air conditioner for middle school computer labs, office, and library area

2009

2009

$

24,000

Kingsford

Breitung Twp Schools

84 high efficiency unit ventilator motors w/variable speed

2009

2009

$

38,640

Kingsford

Breitung Twp Schools

14 high efficiency pumps for heating system 15 high efficiency large air handling unit motors with variable speed motors and related controls

2009

2009

$

46,800

2009

2009

$

52,500

tt i m

ub

Kingsford

-N

e u

d e t

q e R

Breitung Twp Schools

Kingsford

s t s

T O

O R

P P A 2009

6/1/2010

Funding Request

$

2009

Breitung Twp Schools Kingsley Area Schools Kingsley Area High School Kingsley Area Schools Kingsley Elementary School

2 modulating high efficiency boilers 2009 Four additional classrooms added to high school wing. High school built and designed for 480 students, last official enrollment count over 500 6/15/2009

2009

$

124,000

9/15/2010

$

975,000

New building to replace inefficent design and relieve overcrowding

6/15/2009

9/15/2011

$

9,000,000

Kingston

Kingston Community

Replace Elementary School Roof

4/20/2009

5/20/2009

$

165,000

Kingston

Kingston Community

Replace Elementary Compressor with Dryer System

5/1/2009

9/1/2009

$

6,500

Kingston

Kingston Community

Upgrade Student Data System to include parent portal

5/1/2009

9/1/2009

$

7,500

Kingsley Area Schools Kingsley Kingsley Area Schools Kingston Community School District Kingston Community School District Kingston Community School District

Project Name

Expected Completion Date

Kingsley

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

532 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Kingston Community School District Kingston Community School District Kingston Community School District Kingston Community School District Kingston Community School District Kingston Community School District Kingston Community School District Kingston Community School District Kingston Community School District

Location City or Township

Project Description

Start Date

Funding Request

Kingston

Kingston Community

New Computer System Server

5/1/2009

9/1/2009

$

8,000

Kingston

Kingston Community

Polycom Unit Distance Learning

5/1/2009

9/1/2009

$

10,000

Kingston

Kingston Community

Wireless Connectivity to High School Building

5/1/2009

9/1/2009

$

13,000

Kingston

Kingston Community

Renovate Football Field Press Boxes

5/1/2009

9/1/2009

$

50,000

Kingston

Kingston Community

Reconstruct Elementary Playground

5/1/2009

$

200,000

Kingston

Kingston Community

Replace High School Gymnasium Floor

7/1/2009

9/1/2009

$

200,000

Kingston

Kingston Community

Replace A Portion of High School Roof

4/20/2009

5/20/2009

$

10,000

Kingston

Kingston Community

Repave High School Parking Lot

4/20/2009

5/20/2009

$

50,000

Kingston

Kingston Community

Replace A High School Roof Top Heating Unit

6/20/2009

9/1/2009

$

70,000

APS - Long Rapids Elementary

6/15/2009

8/31/2009

$

125,000

LCAS District

Add permanent corridor to attache modular library to building. A retrofit of the District's 1,470 T-12 florescent fixtures to T-8 fixtures would reduce current electric consumption by 33%

6/6/2009

9/1/2009

$

132,300

LCAS High School

Remodel High School Building by replacing entrance and enterior fire doors, nylon commercial grade carpet and installing exterior security cameras. Improvements to the building envelope are need to improve safety, security and energy loss. Carpet in the district would be changed from nylon to Eco Surfaces flooring which uses 60% recycled tire materials. 6/6/2009

9/1/2009

$

246,900

Lake City

LCAS Middle

Renovation of roof, boiler and lighting system of the Middle School Building. Replace current asphalt shingle roof with 60 year life metal decking. The 60 year life of the metal decking roof would eliminate the need for two asphalt shingle roofs from going into local landfill over the life of the building. A 15% reduction in heating cost could be experienced by installing boiler controls on the existing boiler system. The computerized controls would enable the district to heat the building at 70 degrees when occupied and 55 degrees when it is empty. 6/6/2009

9/1/2009

$

421,200

Lake Odessa

Lakewood Vending

Install "vending misers" to all machines in all buildings

6/1/2009

12/31/2009

$

2,300

Lake Odessa

Lakewood Heat exchanges

Install heat exchangers at Clarksville & West El

6/1/2009

12/31/2009

$

30,000

Lake Odessa

Lakewood Gym lighting

Retro-fit gym lighting at all bldgs

6/1/2009

12/31/2009

$

72,000

Lakewood Lighting

Replace all lighting in existing buildings with energy efficient

6/1/2009

12/31/2009

$

100,000

Lakewood Administrative Offices

Build energy efficient Central Offices

6/1/2009

9/1/2009

$

200,000

Lakewood Transportation

Build energy efficient bus maintenance facility

6/1/2009

9/1/2009

$

250,000

Lake Odessa

Lakewood Motion sensors

Install motion sensor devices for all lighting/all bldgs

6/1/2009

12/31/2009

$

300,000

Lake Odessa

Lakewood Power Gleaning

Installs in main power source in all bldgs to reduce energy costs

6/1/2009

12/31/2009

$

900,000

Lake Odessa

Lakewood HS

Site improvements-parking and sidewalks

6/1/2009

12/31/2009

$

200,000

Lake Odessa

Lakewood Technology

Make all buildings wireless throughout

6/1/2009

9/1/2009

$

339,000

Alpena Public Schools Lachine Lake City Area School District Lake City

Lake City Area School District Lake City

Lake City Area School District Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools

Project Name

Expected Completion Date

Lake Odessa

S

02262009

d e t

ub

Lake Odessa

Lake Odessa

tt i m

st

e u

q e R

s

A T

O N

Submitted Requests - Not Approved

PP

O R 9/1/2009

D VE

Route (Infrastructure Only)

533 of 1238

Lansing Township

Lapeer

Lapeer

Lapeer

Lapeer

Lapeer

Lapeer

Lapeer Community Schools

Lapeer Community Schools

Lapeer Community Schools

Lapeer Community Schools

Lapeer Community Schools

Lapeer Community Schools

02262009

i m

e t tt

s t s

-N

T O

6/30/2010

9/30/2009

12/31/2009

12/31/2010

4/1/2010

7/1/2009

7/1/2009

7/1/2009

7/1/2009

7/1/2009

8/1/2009

9/1/2009

P A

10/1/2009

1/1/2010

8/31/2010

Install geothermal heating and cooling system; replace existing windows, building remodeling to accomodate geothermal; relocate existing administrative office; asbestos abatement. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer.

Submitted Requests - Not Approved

8/1/2009

8/30/2010

Install geothermal heating and cooling system; replace existing windows, building remodeling to accomodate geothermal; asbestos abatement. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009

6/30/2009

$

8/1/2009

To compete with more prosperous districts, provide five (5) student computers per classroom. This will replace obsolete technology, add computers comperable to other districts, and enhance the learning environment. Devices will utilize Energy Star compliance. Eliminate energy-wasting CRT monitors in an environmentally-friendly matter and replace with energy-efficient LCD monitors. 6/1/2009

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

Building additions: competition gym, cafeteria, main building entrance, and performing arts center; furniture and loose equipment, kitchen equipment; technology. 8/24/2009

8/31/2010

8/31/2010

7/31/2009

8/31/2009

8/31/2009

7/31/2009

7/31/2009

8/31/2009

12/31/2009

6/30/2010

12/31/2010

$

$

$

$

Route (Infrastructure Only)

534 of 1238

441,600

13,652,719

16,018,200

1,600,000

18,823,613

6,130,575

125,000

80,000

60,000

50,000

25,000

20,000

10,000

8,000

123,000

300,000

92,000

100,000

46,000

90,000

Funding Request

D VE

Expected Completion Date

O PR

1/1/2010

7/1/2009

Building additions: auxilary gym, main building entrance, and fine arts classroom and support space; furniture and loose equipment, kitchen equipment; technology. 8/24/2009

Replace water main to building.

e u q e

Replace roof on school buidling.

Fix soffits/gutters on school building

Install electronic locking system for security

Install full-coverage wireless network

Repair roof.

Electrical wiring in ceilings; mount data projectors in ceilings

Repair/replace showers in locker rooms.

Replace/secure front entrance and select doors/window in buildings for security.

Energy Audit and implementation of findings (i.e. energy efficient windows).

Upgrade interior lighting in buildings to more energy efficient lighting.

Repair broken, cracked, damaged concrete.

7/1/2009

1/1/2010

Start Date

Provide telephones in classrooms, offices, and staff work areas for communication and security purposes. Provide E911 capability, crisis communications, and general Lapeer Community Schools - Telephone/E911 calling ability within the district. The new system will replace the existing antiquated and failing systems. 5/1/2009 Upgrades

LCS/East HS

LCS/ West HS

Project Description

Install security cameras for interior/exterior of buildings

Asbestos abatement

R d

Lapeer Community Schools - Student Learning Stations

LCS/West HS

b u S

Lansing Township

Lansing Township

Lansing Township

LCS/East HS

Waverly East Intermediate School Waverly Community Schools, Multiple Buildings Waverly Community Schools, Windemere View Waverly Community Schools, Windemere View Waverly Community Schools, East Intermediate

Lansing Township

Lansing Township

Waverly East Intermediate School Waverly Community Schools, East Intermediate

Waverly Community Schools, Winans Waverly Community Schools, Multiple Buildings Waverly Community Schools, Multiple Buildings Waverly Community Schools, Multiple Buildings Waverly Community Schools, East Intermediate

Project Name Waverly Community Schools, Multiple Buildings Waverly Community Schools, Multiple Buildings

Lansing Township

Lansing Township

Lansing

Lansing

Lansing

Lansing

Lansing

Lansing

Submitting Agency Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools Waverly Community Schools

Location City or Township

Michigan Federal Economic Recovery - Request List

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lapeer Community Schools Lapeer Community Schools Lapeer Community Schools

Lapeer Community Schools Lapeer Community Schools Lapeer Community Schools Lapeer Community Schools Lapeer Community Schools

Lapeer Community Schools Lapeer Community Schools Lawrence Public School District Lawrence Public School District Lawrence Public School District

Van Buren ISD

Van Buren ISD Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District

Project Name

Project Description

Start Date

Provide cameras, card access, and building perimeter security for twelve (12) buildings, including ten (10) school buildings. The purpose of this is to promote Lapeer Community Schools -Building Security student and faculty health and safety, and secure building property.

Lapeer

Lapeer

Lapeer

Lapeer Schools (LCS)/ East and West HS Lapeer Community Schools - Multimedia Presentation Systems

Install recently purchased multimedia projectors in classrooms, including new projector screens, power, and technology cabling. Provide classroom interactive polling system for student comprehension evaluation.

Lapeer Community Schools - Data Systems

Lapeer

LCS/West HS

Lapeer

LCS/West HS

Site improvements: athletic field improvements, lighting, and paving.

Lapeer

LCS/East HS

LCS/Turrill Elem.

Lapeer Township

LCS/Maple Grove Elem.

Lawrence

Lawrence Public Schools

Lawrence

Lawrence Public Schools

Lawrence

Lawrence Public Schools

tt i m

Technology Center

d e t

O R

6/1/2009

8/1/2009

$

550,000

$

990,000

$

1,002,500

D VE

8/1/2009

$

1,249,000

4/1/2009

8/15/2009

$

1,608,750

6/30/2009

8/30/2010

$

2,079,000

Site improvements: athletic field improvements, lighting, paving, other

6/30/2009

8/31/2010

$

1,831,500

Building additions: physical education classroom; site improvements - playfield improvements, site lighting, and pavement rehabilitation; furniture and loose equipment, kitchen equipment; technology.

8/24/2009

8/31/2010

$

1,918,125

Install geothermal heating and cooling system; replace existing windows; increase electrical service capacity, building remodeling to accomodate geothermal; asbestos abatement; remodel existing classrooms. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009 Site improvements: playfield improvements, site lighting, pavement rehabilitation; technology; furniture and loose equipment; kitchen equipment. 6/30/2009 Replace district building entrance doors with Energy Efficient doors. Old doors are old and very inefficient 9/1/2009

8/31/2010

$

878,625

8/31/2010

$

458,296

11/1/2009

$

50,000

10/1/2009

12/1/2009

$

100,000

5/1/2009

6/1/2009

$

60,000

8/1/2009

4/1/2010

$

1,200,000

4/1/2010

$

1,500,000

Spring 2009

$

10,000

3/1/2010

$

300,000

N s

LCS/Maple Grove Elem.

8/15/2009

Funding Request

5/1/2009

T O

Lapeer Township

8/1/2009

P P A

Lapeer

Lawrence

5/1/2009

Construction and renovation of additional science labs in both high schools. The labs are required to teach science to more students in order to meet the expectations of Michigan's K-12 Curriculum and Standards. 6/15/2009

Provide new data network and server systems for the educational needs of the rural district. The system will allow building-to-building communication, future video and telephone infrastructure, inhance distance learning opportunities, and additional student-learning locations per classroom. Construct auxilary gymnasium. This project will add necessary teaching stations to provide health and fitness instruction.

Lapeer

Expected Completion Date

t s e

qu

e R

Replace district building lighting with energy efficient fixtures and bulbs Purchase of a large backhoe tractor for facility maintenance work and for snow removal in winter. Upgrading existing facility for addition of alternative energy training program that will have at least 50 students attend daily to learn of all new energy sources - i.e. solar, bio-diesel, nuclear, wind, etc…The need is for new equipment, classrooms and supplies.

District

In the process of renovating and upgrading existing infastructure with energy efficent controls. Need to renovate and potential add on classroom space for medical fragile students / special needs students. 8/1/2009 Time clock and attendance system to enhance efficiency and accuracy in paying wages and processing payroll. Spring 2009 Wind turbines and solar panels to create an alternative energy system to reduce utility costs. 9/1/2009

Lawton

High School

Addition to the High School building that adds an entrance enclosure so that students are able to be just outside the building but sheltered from the elements. 9/1/2009

5/1/2010

$

300,000

Lawton

Transportation

No current accommodations exist for maintenance and repair of the district's bus fleet.9/1/2009

3/1/2010

$

500,000

ub

Lawrence Lawton Lawton

02262009

Learning Center

S

District

Submitted Requests - Not Approved

Route (Infrastructure Only)

535 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Lawton Community School District

Lawton Community School District

Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District

Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Lawton Community School District Bloomingdale Public Schools Bloomingdale Public School District Lincoln Park Public Schools

Lawton

Lawton

Project Name

Project Description

Start Date

Expected Completion Date

Alternative Education School

Demolish a facility built in 1917 that is currently only used for the district Alternative Education, Adult Education and Credit Recovery programs. The building is in deteriorating condition

Summer 2010

Spring 2011

Alternative Education School

Replace the facility built in 1917 to house the district's Alternative Education, Adult Education and Credit Recovery programs that serve many low income and disadvantaged students. This building will also include the district administrative offices which are currently housed in a modular building.

Summer 2010

Spring 2011

Funding Request

$

1,000,000

D VE $

5,000,000

Spring 2011

$

16,000,000

Fall 2009

$

3,000

Spring 2009

Spring 2009

$

4,500

Fall 2009

Winter 2010

$

5,000

Fall 2009

Fall 2009

$

10,000

Fall 2009

Fall 2009

$

75,000

O R

Lawton

Elementary

Lawton

District

Replace a 1954 elementary building with a new elementary school building to house grades K - 5, preschool, day care programs and early childhood development programs. This facility will need to contain food service functionality to provide free & reduced meals to more than 60% of the students in attendance. Upgrades in the new builiding will need to include technology infrastructure, electrical and heating/cooling. Playground areas need to be revised to be safe and ADA compliant. Summer 2010 District-wide alert system for accurate, mass communications with school families and staff. Fall 2009

Lawton

Middle School

Mechanical babies for consumers education/family planning class.

Lawton

High School

Photo lab to enhance the yearbook curriculum.

Lawton

Middle School

Kiln for art classes to enhance the curriculum.

Lawton

District

Band instruments and uniforms

Lawton

Elementary

Science kits to enhance the curriculum.

Fall 2009

Fall 2009

$

80,000

Lawton

District

Suburban & truck for snow removal.

Fall 2009

Fall 2009

$

80,000

Lawton

High School

Fall 2009

Fall 2009

$

100,000

Lawton

District

Fall 2009

Fall 2009

$

150,000

Lawton

s t s

T O

P P A

-N

e u

q e R

Electronic curtain for the auditorium & fly system to replace one that does not work. Technology upgrades to include software to enhance current programs offered, graphing calculators, industrial technology equipment.

District

d e t

Purchase and install wireless computer labs in Alternative Education, Elementary, Middle School and High School facilities for the ability to have portable instruction enabling technology to be utilitzed anywhere in the facility.

2/1/2009

3/1/2009

$

200,000

Run fiber from the Village of Lawton to the main trunk (I-94), which is 5 miles. This would increase our internet speed and efficiency. Could be used by community businesses as well as the schools. Employee fitness center to promote health and well-being to help control health insurance costs.

Summer 2009

Fall 2009

$

200,000

Summer 2010

Winter 2011

$

300,000

District

Security System in all buildings to include 150 cameras, adequate number of DVRs.

Summer 2009

Fall 2009

$

300,000

District

Laptops for all students to replace the use of textbooks with online learning media as well as allowing each student to learn and master computer usage. Fall 2009

Fall 2009

$

1,100,000

District

Incentive for advanced coursework for teachers.

Fall 2009

Spring 2010

$

2,000,000

Lee Township

Pullman Elementary

Residing and foundation work at Pullman Elementary Bus Garage

3/1/2009

6/30/2009

$

10,000

Lee Township

Pullman Elementary

7/1/2009

8/31/2009

$

75,000

Lincoln Park

Lincoln Park Public Schools Carr

Renovate front entry way at Pullman Elementary Remove Asbestos Ceiling - Install Drop Ceiling (lights, fire alarm, exhaust fans, technology infrastructure, clocks, etc.)

6/18/2009

August '10

$

929,700

Lawton

m b u

Lawton

District

Lawton

Lawton Lawton

02262009

itt

District

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

536 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) Lakeshore School District (Berrien) St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools

Location City or Township

Project Name

Lincoln Township

Lakeshore Roosevelt Elem

Lincoln Township

Lakeshore Roosevelt Elem

Lincoln Township

Lakeshore Stewart Elem

Lincoln Township

Lakeshore Roosevelt Elem

Lincoln Township

Lakeshore Stewart Elem

Lincoln Township

Lakeshore Middle School

Lincoln Township

Lakeshore Middle School

Lincoln Township

Lakeshore High School

Lincoln Township

Lakeshore High School

Lincoln Twp.

SJPS - Upton MS

Lincoln Twp.

SJPS - Upton MS

Project Description Start Date replace original boiler now used as a back up boiler with new energy efficient packet boiler 9/1/2009 replace domestic water piping through out building and insulate piping to improve energy efficiency and reduce water leakage 9/1/2009 replace domestic water piping through out building and insulate piping to improve energy efficiency and reduce water leakage 9/1/2009 replace 2700 sq feet of single pane windows with new energy efficient windows to reduce energy leakage 7/1/2009 replace 3750 sq feet of single pane windows with new energy efficient windows to reduce energy leakage 7/1/2009 replace 4000 sq feet of single pane windows with new energy efficient windows to reduce energy leakage 7/1/2009 replace domestic water piping through out building and insulate piping to improve energy efficiency and reduce water leakage 9/1/2009 replace domestic water piping through out building and insulate piping to improve energy efficiency and reduce water leakage 9/1/2009 replace single pane windows throughout building with new energy efficient windows to reduce energy leakage 7/1/2009 Technology in Classrooms - smartboards, interactive materials and infrastructure to integrate technology into instruction. 2/1/2009 Fire Protection - to extend sprinkler system into areas that were left out of 1999 bond issue due to lack of funding. 6/1/2009

Lincoln Twp.

SJPS - Upton MS

New Roof - Partial replacement of roof that leaks

A T

s

t s e

O N

Expected Completion Date

6/1/2009

Alternative Busses and Trucks, shovel ready June 1, 2009 with completion June 30, 2009. Purchase 10 hybrid busses to replace our 10 oldest busses. This new technology, the Hybrid IC bus, offers two types of busses; the charge sustaining 10AHH, and charge depleting 10 AHJ bus. Our plan would be to order five of each and collect data to see which is better. The Hybrid IC busses offer a 70 % increase in fuel economy and a 70% reduction in emissions. This would be a good investment for the future. IC Bus, headquartered in Warrenville, Ill., is an affiliate of Navistar, Inc. The nation's largest integrated manufacturer of school buses, IC Bus is a leader in passenger protection, chassis design, engines and ergonomics. The company is also a leading producer of commercial buses for several markets. As an American company this would be a re-investment in out nation. The cost for this project would be 1.9 million. 6/1/2009

3/1/2010

$

42,000

10/1/2010

$

125,000

$

128,000

$

140,000

$

194,000

3/1/2010

$

207,000

10/1/2010

$

247,000

12/1/2010

$

269,000

9/1/2010

$

657,000

8/1/2009

$

1,000,000

8/1/2009

$

100,000

8/1/2009

$

700,000

June 31, 2009

$

1,900,000

6/30/2010 150 days after start

$

3,000,000

$

1,200,000

10/1/2010 3/1/2010

O R

PP

Funding Request

3/1/2010

D VE

Route (Infrastructure Only)

u q e

Livonia Public Schools Livonia

R d

e t tt

Livonia Public Schools - District Wide

i m

Livonia Public Schools Livonia Clarenceville School District Livonia

02262009

b u S

Livonia Public Schools - Old Cooper Elementary School Clarenceville School District - Clarenceville High School

Hazardous Waster Cleanup, shovel ready June 2009 with completion June 2010. Complete the clean up of the municipal dump site which was discovered under Old Cooper School. The District has been working for many years with the State of Michigan DEQ and the City of Westland to remediate this site. Some clean-up has been completed. The District has been working with the community and has preliminary plans to re-use this site for a soccer complex with both indoor and out doo fields. Preliminary plans with all testing already sent to MDEQ. Some MDEQ grant funds have been set aside for this project. Plans are complete; we are waiting for a source for the remaining funding only. This would create permanent jobs and return an unusable site to the community for recreational use. Projected cost 3 million. 6/1/2009 Convert closed pool to a multi purpose room for the district.

Submitted Requests - Not Approved

6/15/2009

537 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Livonia Public Schools - Franklin and Stevenson High School

Underground Storage Tanks, shovel ready June 2009 with completion August 2009. Complete the clean up of the underground storage tanks at Franklin and Stevenson High Schools. The project would include soil remediation and site restoration. Projected cost $200,000.00. 6/1/2009

Livonia Public Schools - Garfield Elementary

Garfield Elementary 10218 Arthur, 48150, built in 1955, 62,000 square feet, on 8.6 acres. This building has had a more recent renovation but the replacement of HVAC with Energy Star equipment would make it more energy efficient. Upgrade electronic locking system with security cameras for student safety. Cost for this renovation would be 2.9 million. 6/15/2009

Livonia Public Schools - District Wide

Clean Water, shovel ready June 2009 with completion June 2010. Repair and replace the storm water sewer systems at the school buildings. Redesign the site conditions to effectively channel the run off to the storm water sewer systems. Programs to find and eliminate illicit connections and discharges to the municipal draining system or waters of the state. Projected cost $300,000.00. 6/1/2009

Livonia Public Schools Livonia

Livonia Public Schools - Hayes Elementary

Hayes Elementary 30600 Louise, 48185, built in 1959, 52,000 square feet, on 7.9 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost for this project 3.8 million. 6/15/2009

Livonia Public Schools Livonia

Kennedy Elementary 14201 Hubbard, 48154, built in 1964, 51,000 square feet, on 12.3 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student Livonia Public Schools - Kennedy Elementary safety. Total cost for this project is 3.9 million.

Livonia Public Schools Livonia

Expected Completion Date

$

200,000

$

2,900,000

6/30/2010

$

3,000,000

8/15/2009

$

3,800,000

6/15/2009

8/15/2009

$

3,900,000

Livonia Public Schools Livonia

Rosedale Elementary 36651 Ann Arbor Trail, 48150, built in 1960, 41,000 square feet on 10 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student Livonia Public Schools - Rosedale Elementary safety. Total cost for this project is 4.0 million. 6/15/2009

8/15/2009

$

4,000,000

Livonia Public Schools Livonia

Cleveland Elementary 28030 Cathedral, 48150, built in 1959, 49,000 square feet, on 12.7 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student Livonia Public Schools - Cleveland Elementary safety. Cost for total renovation 4.1 million. 6/15/2009

8/15/2009

$

4,100,000

Livonia Public Schools Livonia

Hoover Elementary 15900 Levan, 48154, built in 1964, 53,000 square feet, on 10 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost for this project is 4.1 million. 6/15/2009

8/15/2009

$

4,100,000

Coolidge Elementary 30500 Curtis, 48152, built in 1959, 69,000 square feet, on 9.4 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Coolidge has a need to replace the water and heating piping. These replacements would make the environment healthier for students and staff. Upgrade electronic locking system with security cameras for student safety. Cost for total renovation 4.2 Livonia Public Schools - Coolidge Elementary million. 6/15/2009

8/15/2009

$

4,200,000

Livonia Public Schools Livonia

Livonia Public Schools Livonia

Livonia Public Schools Livonia

02262009

T O

N s

t s e

tt i m

d e t

Livonia Public Schools - Hoover Elementary

b u S

Submitted Requests - Not Approved

O R

P P A

qu

e R

8/31/2009

Funding Request

8/15/2009

D VE

Route (Infrastructure Only)

538 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Grant Elementary 9300 Hubbard, 48150, built in 1956, 58,000 square feet, on 8.8 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost for the renovation would be 4.2 million. 6/15/2009

Livonia Public Schools Livonia

Livonia Public Schools - Grant Elementary

Livonia Public Schools Livonia

Roosevelt Elementary 30200 Lyndon, 48154, built in 1957, 68,000 square feet, on 8.7 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost 6/15/2009 Livonia Public Schools - Roosevelt Elementary for this project is 4.2 million.

Livonia Public Schools Livonia

Webster (Tyler) Elementary 32401 Pembroke, 48152, built in 1959, 62,500 square feet, on 14 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Webster has a need to replace the water and heating piping. These replacements would make the environment healthier for students and staff. Upgrade electronic locking system with security cameras for student safety. Cost for total Livonia Public Schools - Webster Elementary renovation 4.2 million. 6/15/2009

T O

N s

D VE $

4,200,000

$

4,200,000

8/15/2009

$

4,200,000

O R

P P A

Cass Elementary 34633 Munger, 48154, built in 1965, 53,000 square feet, on 8.5 acres. This building has major issues with design, room layout, security, roof drainage. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Cost for total renovation 4.4 million.

st

8/15/2009

Funding Request

8/15/2009

Livonia Public Schools Livonia

Livonia Public Schools - Cass Elementary

6/15/2009

8/15/2009

$

4,400,000

Livonia Public Schools Livonia

Randolph Elementary 14470 Norman, 48154, built in 1966, 59,000 square feet, on 8.7 acres. This building has major issues with design and room layout. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost for this project is 4.5 Livonia Public Schools - Randolph Elementary million. 6/15/2009

8/15/2009

$

4,500,000

Livonia Public Schools Livonia

Johnson Upper Elementary 8400 Hix, 48185, built in 1966, 96,000 square feet, on 27 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost 6/15/2009 Livonia Public Schools - Johnson Elementary for this project is 4.8 million.

8/15/2009

$

4,800,000

Livonia Public Schools Livonia

Livonia Public Schools - Cooper Elementary

Cooper Upper Elementary 28550 Ann Arbor Trail, 48185, built in 1954, 95,000 square feet, on 18.8 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Cooper would need significant work on the building envelope to help improve energy efficiency. Upgrade electronic locking system with security cameras for student safety. The total cost for renovation would be 5.1 million. 6/15/2009

8/15/2009

$

5,100,000

Livonia Public Schools - Riley Upper Elementary

Riley Upper Elementary 15555 Henry Ruff, 48154, built in 1957, 137,000 square feet, on 27 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Riley has a need to replace the water and heating piping. These replacements would make the environment healthier for students and staff. Upgrade electronic locking system with security cameras for student safety. Cost for total renovation 6.2 million. 6/15/2009

8/15/2009

$

6,200,000

e u

eq

R d

e t tt

i m

ub

S Livonia Public Schools Livonia

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

539 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Livonia Public Schools Livonia

Livonia Public Schools Livonia

Livonia Public Schools Livonia

Project Name

Project Description

Start Date

Expected Completion Date

Livonia Public Schools - Holmes Middle School

Holmes Middle 16200 Newburgh, 48154, built in 1967, 124,000 square feet, on 24 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost for this project is 6.8 million. 6/15/2009

Livonia Public Schools - Frost Middle School

Frost Middle 14041 Stark, 48154, built in 1963, 143,000 square feet, on 27 acres. The items which would improve energy efficiency are thermal glazed windows, insulated doors, Energy Star HVAC equipment, Energy Star lighting and electrical. Upgrade electronic locking system with security cameras for student safety. Total cost for this project is 7.8 million. 6/15/2009

Livonia Public Schools - District Wide

New Construction, shovel ready October 2009 with completion June 2011. Design and build a new state of the art green building for our pre-school/child care education facility. The programs include child care/early education for students with disabilities. The building would be heated and cooled with geothermal wells. Lighting would be designed to utilize natural lighting as much as possible. The roof would be green to reduce or eliminate run-off. All parking areas would drain to a detention pond with all designs for the building and grounds taken from LEED specifications. Projected cost 18 million. 10/1/2009

Livonia Public Schools - Livonia Career and Technical Center

New Construction, shovel ready October 2009 with completion June 2011. Design and build a new state of the art green building for our career technical education facility which includes instruction in: CAD/Architectural Technology, Automotive Technology, Building Trades, CISCO Systems, Criminal Justice, Digital Imaging and Design, Fashion Merchandising, Hospitality management, Medical Assistant, Sports Medicine, and Web Design. This would include a performing arts theatre with classrooms for stagecraft and lighting design. The building would be heated and cooled with geothermal wells. Lighting would be designed to utilize natural lighting as much as possible. The roof would be green to reduce or eliminate run-off. All parking areas would drain to a detention pond with all designs for the building and grounds taken from LEED specifications. Projected cost 22 million. 10/1/2009

T O

8/15/2009

D VE $

6,800,000

$

7,800,000

6/30/2011

$

18,000,000

6/30/2011

$

22,000,000

8/1/2010

$

8,500,000

8/1/2009

$

557,723

8/30/2010

$

25,000

O R

P P A

Funding Request

8/15/2009

Route (Infrastructure Only)

N s

Livonia Public Schools Livonia

e t t

Long Lake Township

Traverse City Area Public Schools - Long Lake Elementary

Lowell Area Schools

Lowell

Lowell-Bus Garage

Lowell Area Schools

Lowell

Lowell Area Schools

Lowell

Lowell Area Schools

Lowell

Lowell Area Schools

Lowell

Lowell Area Schools Lowell Area Schools

m b u Lowell-District

Reconstruction project to develop a LEED certified elementary school inclusive of Green and energy efficient initiatives. Reconstruction provides opportunity for shared services between public school system and Local and State entities to provide a true community learning center. Reconstruction shall include technology packages to support student curriculum. 8/1/2009 Replace bus garage office with addition and remodel existing building for Maintenance Office. 4/1/2009 Install secured access card reader system at main entrance and other key access points of all district buildings. 6/1/2010 6/1/2010

8/30/2010

$

25,000

6/8/2009

8/21/2009

$

81,000

Lowell-Admin Building

Replace gym announcement and sound system. Re-key all doors and access points in order to secure facilities reliably and control access. Mill and resurface existing parking lot, upgrade emergency lighting and electrical panel.

6/8/2009

8/21/2009

$

102,017

Lowell

Lowell-District

Replace network technology switches.

6/1/2010

8/30/2010

$

250,000

Lowell

Lowell-Cherry Creek Elementary

Replace roof.

6/1/2010

8/30/2010

$

550,000

02262009

Lowell-Middle School

u q e

R d

Traverse City Area Public Schools

it

t s e

S

Lowell-District

Submitted Requests - Not Approved

540 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lowell Area Schools

Lowell

Project Name

Project Description

Start Date

Lowell-Cherry Creek Elementary

Replace mechanical controls, replace domestic water heater and booster in food service area, replace boilers and controls, replace gym air handler units, and upgrade emergency lighting. 6/8/2009

8/21/2009

8/21/2009

Lowell Area Schools

Lowell

Lowell-Bushnell Elementary

Building renovations to include relocating main office, replacing exterior windows and doors, mill and resurface asphalt surface, replace sidewalks and curbs, install tile in main lobby, install new mechanical controls in building, replace primary heat pumps, upgrade emergency lighting and fire alarm system, and install electric for ceiling mounted projectors. 6/8/2009

Lowell Area Schools

Lowell

Lowell-Cherry Creek Elementary

Replace main gym floor.

6/1/2010

Lowell Area Schools

Lowell

Lowell-District

Replace telephone system.

6/1/2010

Ludington Area School District Ludington Area School District Ludington Area School District Ludington Area School District

Ludington Ludington

Mason-Lake ISD Ludington Ludington Area School District Ludington Ludington Area School District Ludington Ludington Area School District Ludington South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp.

02262009

D VE

90,000

P P A

8/30/2010

$

100,000

6/1/2009

6/30/2009

$

110,000

6/1/2009

8/31/2009

$

110,000

4/1/2008

6/30/2009

$

160,000

4/1/2009

6/30/2009

$

275,000

Mason-Lake ISD Addition & Renovation Project

Energy efficient exterior doors, windows, and two vestibules will be added to our school building. The intent of the project is to save money on energy costs. The vestibules will have ceiling-mounted forced air units that will create a barrier that will not allow hot or cold air, depending on the season, into the building when handicapped students enter or exit the building. Most of the improvements directly effect special education classroom areas. The current doors and windows are 34 years old and are ill-fitting and uninsulated. 5/15/2009

8/21/2009

$

340,000

Ludington, Transportation

Bus Garage traffic lane Pave ment for transportation of students.

4/1/2009

6/30/2009

$

20,000

4/1/2009

6/30/2009

$

25,000

Electrical upgrade Franklin to give more than 1 outlet per building 6/1/2009 Install bus diesel exhaust system in garage to improve quality of indoor environment and avoid potential health risks 6/15/2009

8/31/2009

$

85,000

7/30/2009

$

20,000

Replace old boilers, all classroom univents and rooftop units 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009

8/24/2010

$

300,000

8/24/2010

$

500,000

8/24/2010

$

500,000

8/24/2010

$

500,000

8/24/2010

$

1,000,000

Procure Orchestra Shell; none exist today

4/15/2009

8/24/2009

$

175,000

Install powered security gate to minimize risk of injury to bus drivers

6/15/2009

8/24/2009

$

70,000

Install air conditioning - No air conditioning currently in building

6/15/2009

8/24/2009

$

780,000

m b u

e u

eq

R d

Ludington, Franklin Elementary South Lyon Community Schools - Operations Center South Lyon Community Schools - Dolsen Elementary School South Lyon Community Schools - Dolsen Elementary School South Lyon Community Schools - Kent Lake Elementary School South Lyon Community Schools - Hardy Elementary School South Lyon Community Schools - South Lyon East High School South Lyon Community Schools - South Lyon East High School South Lyon Community Schools - Operations Center South Lyon Community Schools - Kent Lake Elementary School

e t t

it

s t s

-N

Pavement project Franklin, student egress and address safety issues for students.

Submitted Requests - Not Approved

O R 8/30/2010

Route (Infrastructure Only)

585,353

$

Ludington, Franklin Elementary

S

$

1,177,302

T O

Ludington

Funding Request

$

New windows and fire doors for Franklin Elementary, 16 classrooms. Project entails two windows per classroom, and five fire exit doors. Replacing 50-year-old singleLudington Area Schools (Ludington), Franklin pane windows with energy efficient windows. Heat retention improved by tight new Elementary doors. New Boilers, energy efficient. Also, install neumatics for computerized temperature Ludington, Franklin Elementary control in order to increase energy efficiency. Roofing project at Foster Elementary, approximately 40,000 square feet. Includes Ludington, Foster Elementary insulation to improve energy efficiency. Roofing project at Middle School, 68,000 square feet. Roof is 30 years plus old. Ludington, Middle School Includes insulation to improve energy efficiency.

Ludington

Expected Completion Date

541 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency South Lyon Community Schools Lyon Twsp.

Project Name South Lyon Community Schools - Dolsen Elementary School

Ionia Public Schools

Lyons Twp

Ionia Public Schools

Ionia Public Schools L'anse Creuse Public Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools

Lyons Twp

Lamphere Public Schools Lamphere Public Schools Lamphere Public Schools

Lamphere Public Schools

Lamphere Public Schools

Mancelona Public Schools Manton Consolidated Schools

Project Description

Start Date

Expected Completion Date

Funding Request

8/24/2010

$

1,950,000

12/9/2009

$

480,000

Ionia Public Schools

Install air conditioning - No air conditioning currently in building 6/15/2009 Replace the glass above classroom walls at Twin Rivers for student safety & energy efficiency. 7/9/2009 Construction of new Principal Office with conference room & nurse station at Twin Rivers Elementary Sept. 09

$

300,000

Macomb

LCPS HSN Science Laboratories

Construction of four new science laboratories

9/1/2009

8/1/2010

$

2,000,000

Macomb Township

Chippewa Valley - Dakota High School

Replace stage dimming system

9/1/2009

$

250,000

Macomb Township

Chippewa Valley - Fox Elementary

Upgrade lighting (T8, LED, O.S.)

9/1/2009

8/1/2010

$

252,813

Macomb Township

Chippewa Valley - Mohawk Elementary

Upgrade lighting (T8, T5, LED, O.S.)

9/1/2009

8/1/2010

$

281,250

Macomb Township

Chippewa Valley - Dakota High School

Replace auditorium lights

9/1/2009

8/1/2010

$

312,500

Macomb Township

Chippewa Valley - Iroquois Middle School

Upgrade lighting (T8, T5, LED, O.S.)

9/1/2009

8/1/2010

$

474,438

Macomb Township

Chippewa Valley - Dakota High School

Upgrade lighting (T8, T5, LED, O.S.)

9/1/2009

8/1/2010

$

1,726,235

Lamphere

Roofing Replacement for sections of roofs at Hiller Elementary School, Page Middle School, Lamphere High School and the Administration Center. The roofs are several decades old on average and in serious need of replacement. 6/15/2009

August 15,2009

$

1,380,000

Lamphere

Install a domestic water line at Lamphere High School. The current water line breaks approximately 3-4 times per year and needs repair. The line is extremely old and in need of replacement. 6/15/2009

Almost Immediately

$

82,000

Lamphere

Replace HVAC Units at Page Middle School, Lessenger Elementary, Edmonson Elementary, and Simonds Elementary Schools. The current units are extremely old, don't always work properly and are inefficient. 6/15/2009

August 15,2009

$

231,000

Construct a 5,000 square foot alternative education building. We currently educate our alternative education students at Lamphere High School and we feel that they would benefit greatly from being instructed at a separate site within our district. We currently have the land available but need the funding to build on the site.

January, 2010

$

750,000

Parking Lot expansion at Simonds Elementary and Hiller Elementary and replacement of west driveway at Lamphere High School. Our enrollment has been on the rise and we have seen a significant increase in the number of students being driven to our school buildings, which has caused some safety concerns. 6/15/2009

August 15,2009

$

381,000

This roofing project involves the following for 9 different zones in our three building district: removal of old roof and flashing, install additional insulation, and install new thermoplastic polyolefin roofing membrane & new flashing.

5/11/2009

7/11/2009

$

465,000

Improvement of energy and efficiency by insulating and roofing the oldest portion of the school. The district is one building K-12.

Three months after funds are appropriated

One month

$

200,000

Madison Heights

Madison Heights

Madison Heights

Madison Heights

Madison Heights

Lamphere

m b u

Mancelona

Manton

02262009

itt

Lamphere

d e t

Mancelona Public Schools

S

Manton Consolidated Schools

s

st

e u

q e R

A T

O N

Submitted Requests - Not Approved

9/10/2009

PP

O R

6/15/2009

8/1/2010

D VE

Route (Infrastructure Only)

542 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Glen Lake Community Schools Maple City

Roofing Upgrade - Replace and upgrade current stone ballast membrane roof with mechanically fastened membrane including new hi density polyisocynurate insulation sheeting to increase R-value 14 points and reduce energy loss. The age of the current roof is 30 years - maximum warranty 20 yrs. Glen Lake Schools replaced the worst portion of the roof last summer/fall. That portion of the membrane was pulling away from the roof and would have caused structural damage to the building if not Glen Lake Community Schools (K-12 building) replaced. 85,000 square foot of the roof is on borrowed time. 6/1/2009

Glen Lake Community Schools Maple City

Lighting Upgrade - Replace old technology lighting (metal halide, T-12 florescents) with energy efficient T-5 florescent lighting in gyms, classrooms and hallways. Oldest generation of lighting is 30+ years, newest is 17 years. 80% of project is in the 30+ Glen Lake Community Schools (K-12 Building) years old. 4/1/2009

Glen Lake Community Schools Maple City

Window & Door Upgrade - Replace existing single pane classroom windows with energy efficient thermopane units to greatly reduce heat loss and provide more student comfort and security. Windows are in disrepair have fallen out of frame and add to both energy and security issues. Oldest windows & doors are 30 years old. Newest windows and doors are 17 years old. 80% of the project would address windows and doors 30 years old. This would also include replacing older door systems at entry ways to reduce heat loss and provide a higher level of security. We have a problem of either being locked in building or out of building because of Glen Lake Community Schools (K-12 building) disrepair of doors. 7/1/2009

Glen Lake Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Charlevoix Public Schools Charlevoix Public Schools

Expected Completion Date

T O

-N

Aug. 2009

Funding Request

D VE $

425,000

8/1/2010

$

750,000

8/1/2010

$

300,000

7/1/2009

8/1/2010

$

400,000

6/1/2009

9/30/2009

$

12,000

P P A

O R

Maple City

Restroom/Locker Room Upgrades - Renovate areas and reduse water and electric use by replacing old high use fixtures and lighting with new low flow fixtures and Glen Lake Community Schools (K-12 building) energy efficient lighting. Provide ADA compliant facilities for staff and students.

Marcellus

Marcellus Community School - MS

Marcellus

Marcellus Community School - MS,VS,MS,ES HS,VS,MS,ES Bleacher repair

7/1/2009

8/31/2009

$

12,500

Marcellus

Marcellus Community School - VS

7/1/2009

8/30/2010

$

12,500

Marcellus

Marcellus Community School - MS.HS,ES

HS,MS,ES Asbetoes removal

$

28,000

Marcellus

Marcellus Community School - HS

HS Ceiling/Carpet repair/replacement

6/5/2009

8/30/2009

$

36,000

Marcellus

Marcellus Community School - ES

ES Heating / cooling System repair

6/1/2009

9/30/2009

$

41,500

Marcellus

Marcellus Community School - HS

HS Heating / cooling System repair

6/1/2009

9/30/2009

$

42,500

Marcellus Community School

Computer - 25 lab Laptops

7/1/2009

6/30/2011

$

60,000

Marcellus Community School - MS

MS roof repair/resurface

4/1/2009

6/30/2010

$

105,000

Marcellus Community School

4 Buses / over next 2years

6/1/2009

5/30/2011

$

195,000

Marcellus Community School

Utility Truck replacement

6/1/2009

7/1/2009

$

325,000

Marcellus

Marcellus Community School

Marion Township

Charlevoix Public Schools, High School

8/30/2009

$

50,000

Marion Township

Charlevoix Public Schools, High School

Computer - Infrastructure repair/upgrade 7/1/2009 Construction of a storage building on the grounds of the high school, to be used for performing arts sets as well as maintenance equipment. 6/1/2009 Construction of a 400 square foot addition to our existing high school art classroom to be used for pottery and sculpture classes. 6/1/2009

8/30/2009

$

100,000

m b u

Marcellus Marcellus Marcellus Marcellus

02262009

S

e u

MS Heating / cooling System repair

eq

VS Parking lot repair/resurface

R d

e t t

it

s t s

Submitted Requests - Not Approved

Route (Infrastructure Only)

6/30/2011

543 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

North Star Academy

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Marshall Public Schools

Project Name

Project Description

Expected Completion Date

Start Date

Marquette Township

North Star Public School Academy

Construction of an elementary school addition to the current building to enable the district to add a grade K-5 program. Proposed expansion is in response to local government and family requests.

Marshall

Marshall Public Schools, Marshall Middle School

Roof replacement above technology building walkway and boiler room. Roof decking is gypsum with EPDM fully adhered system on top. EPDM seams are failing and roof suffered from moisture seeping under the seams. 6/15/2009

Marshall Public School, High School

Replace roof over the auditorium (section F). Room is approximately 9,800 sq ft. The roofing system is badly degraded and decaying due to excessive moisture. The overall condition is considered to be poor and has reached its expected life cycle with To be determined large amounts of saturation and the coatings are delaminating. Plan is to replace it depending on with new insulation under EPDM rubber seal. funding.

Marshall

Marshall Public Schools

Install district wide digital camera system that will allow us to monitor the whole district area. This system would be web-based to allow local police and fire departments to To be determined tie into if needed in emergency. Working with Calhoun County COPS grant called depending on "Secure Our Schools". funding.

Marshall

Replace roof over boiler room/kitchen and loading dock. Area is approximately 18,000 sq ft. Roof has major moisture issues (100% saturated) and is well beyond Marshall Public Schools, Marshall High School repair. Replacement roof would be EPDOM rubber roof with new insulation.

Marshall

4/15/2009

8/15/2009

O R

T O

P P A

N s

Funding Request

$

1,780,293

D VE $

35,000

$

113,000

$

160,000

6/15/2009

$

209,991

Marshall

Marshall Public School, Marshall Middle School

Slate roof replacement over middle school section A- building. Building was built in 1927 and is approximately 3,264sq ft. Some of the slate is missing or broken and have proven to be beyond repair. The overall condition is considered to have failed and has reached its expected life cycle. Replacing original slate tile with some new type of tile.

To be determined depending on funding.

$

260,000

Marshall

Replace room vent heaters. Units are original equipment (1971) and are in need of replacement. They are fed by a closed loop steam system. Many units have failed causing system to freeze up in winter. Many of the coils are no longer repairable. Marshall Public Schools, Marshall High School Unit controls will need to be upgraded as well.

To be determined depending on funding.

$

452,000

Marshall

Repair many areas of roof. Shearman School is approximately 24,760 sq ft. in size. Marshall Public Schools, Marshall Alternative The roofing systems of all sections were installed in various years. Roof needs High School (Shearman) extensive roof repair as well as gutter replacement.

To be determined depending on funding.

$

23,250

Marshall

Replace roof over Gym (section D). Roof is approximately 21,930 sq ft. and is an old EPDM system that is badly deteriorated. The overall condition is considered to have To be determined failed and has reached its expected life cycle. Want to replace it with an new EPDM depending on Marshall Public Schools, Marshall High School system with new insulation. funding.

$

194,360

Marshall

Replace roof over the core classrooms (section C). Area is approximately 19,436 sq ft. and is an old EPDM system that is badly deteriorated to the point of being unrepairable. The overall condition is considered to be very poor and has reached its To be determined expected life cycle. The roof is largely saturated. Plan is to replace it with new depending on Marshall Public Schools, Marshall High School insulation covered by EPDM rubber seal. funding.

$

539,869

Marshall Public Schools

remodeling, refurnishing, equipping and re-equipping existing school facilities; acquiring, installing, equipping and re-equipping school facilities for educational technology improvements; erecting, furnishing and equipping additions to the high school, including kitchen/cafeteria and music suite expansion and an auditorium; and developing and improving sites, including playgrounds, playfields and outdoor physica education and athletic facilities.

$

35,340,000

Marshall Public Schools

To be determined Continue to complete wireless throughout the district which would include six buildingsdepending on funding. Require system to be tied into 64 access points.

$

260,000

Marshall

Marshall

02262009

e u

st

eq

R d

e t t

t i m

b u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

544 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Marshall Public School, Marshall Middle School

Replace domestic and sanitary water lines within building A. Building is three stories To be determined with tunnels and was built in 1927 and still has the original piping. Piping is beginning depending on to fail from the inside out. Work is labor intensive and thereby, costly. funding.

Calhoun ISD Service Center HVAC Units

The Service Center of the Calhoun ISD rooftop HVAC units (2) are in need of replacement. Maintenance needs have increased annually and the efficiency of the units need improvement.

Calhoun ISD Service Center Bathroom Renovation

The Service Center of the Calhoun ISD have conference rooms which are used continually for meetings and professional development of teachers, administrators, community and oteher educators. Bathrooms are about 40 years old and in need of renovation to accomadate the numerous meetings. 4/30/2009

Calhoun ISD Service Center Conference Room Expansion

The Service Center of the Calhoun ISD have conference rooms which are used continually for meetings and professional development of teachers, administrators, community and oteher educators. Often rooms are booked and accomadations are not available. Other venues are minimal to hold these meetings thus limiting opportunities. An additional conference room project is needed. 6/30/2009

Martin Public Schools Martin

Martin Public Schools

erecting an addition to and partially remodeling, furnishing and refurnishing and equipping and re-equipping a school building; acquiring, installing and equipping technology for school facilities; purchasing school buses; constructing, equipping, developing and improving athletic facilities, play fields and playgrounds; and developing and improving parking areas and sites

Martin Public Schools Martin

Martin Public Schools band room

construct new band room/pwerformance area

St. Clair County Resa Marysville

Admin Bldg - IT Dept St. Clair County RESA - Woodland Development Center & TEC Center

Electrical upgrades

Marshall Public Schools

Calhoun ISD

Calhoun ISD

Calhoun ISD

Marshall

Marshall Twp

Marshall Twp

Marshall Twp

T O

s t s

-N

4/30/2009

6/30/2009

P P A

O R 6/30/2009

8/30/2009

Funding Request

$

2,200,000

$

250,000

$

150,000

$

300,000

$

3,500,000

D VE

6.1.09

8.31.10

$

2,500,000

5/9/2009

5/1/2010

$

30,000

5/9/2009

9/9/2009

$

20,000

Network server upgrade 2/1/2009 Update Electromechanics Program to include Alternative energy. Install solar panels & 3 wind turbines 4/1/2009

4/1/2009

$

20,000

9/1/2009

$

455,000

Building addition to accommodate program expansion

6/1/2009

6/1/2011

$

1,500,000

Install new projectors Admin, TEC

3/1/2009

6/30/2009

$

6,000

Upgrade video monitors

3/1/2009

6/30/2009

$

12,000

Installation of RTU to service Special Ed program

6/9/2009

6/1/2010

$

20,000

St. Clair Cty RESA - Admin

New servers for Educational Technology

3/1/2009

6/30/2009

$

20,000

St. Clair Cty RESA - Admin St. Clair County RESA - Woodland Development Center & TEC Center

Switch uprades

3/1/2009

8/1/2009

$

45,000

UV coil cleaning mechanisms

6/9/2009

12/1/2009

$

52,000

Installation of RTU to service vocational program

6/9/2009

6/1/2010

$

60,000

Update geothermal domestic hot water assists

6/9/2009

9/9/2009

$

81,000

St. Clair County Resa Marysville

St. Clair County RESA - TEC Center St. Clair County RESA - Woodland Development Center & TEC Center St. Clair Cty RESA - Technical Education Center, Admin & Woodland

Replace distance learning equipment Admin, TEC, Woodland

3/1/2009

6/30/2009

$

84,000

St. Clair County Resa Marysville

St. Clair County RESA - TEC Center

Roof Drain

6/9/2009

12/1/2010

$

150,000

St. Clair County Resa Marysville St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use St. Clair Cty RESA - Technical Education Center

St. Clair County Resa Marysville St. Clair County Resa Marysville

St. Clair County RESA - TEC Center St. Clair Cty RESA - Admin & Technical Education Ctr

St. Clair County Resa Marysville

tt i m

St. Clair County Resa Marysville

St. Clair Cty RESA St. Clair County RESA - Woodland Development Center

St. Clair County Resa Marysville

ub

St. Clair County Resa Marysville St. Clair County Resa Marysville St. Clair County Resa Marysville St. Clair County Resa Marysville St. Clair County Resa Marysville

02262009

d e t

S

e u

Geopump frequency drive upgrade

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

545 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

SIS server replacement

1/19/2009

8/15/2009

$

280,000

St. Clair County Resa Marysville

St. Clair Cty RESA - Admin

Data center greening project

4/1/2009

8/31/2009

$

350,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

Replace finance servers

2/1/2009

8/1/2009

$

500,000

St. Clair County Resa Marysville

St. Clair County RESA - Admin Bldg

Expansion of technology training facility

6/9/2009

12/1/2010

$

3,000,000

St. Clair County Resa Marysville

St. Clair Cty RESA - Admin St. Clair Cty RESA - Admin & Technical Education Ctr

Upgrade wireless solution

2/1/2009

$

20,000

Recabling of rooms Admin, TEC

3/1/2009

6/30/2009

$

10,000

Room control learning system three rooms in TEC

4/1/2009

7/1/2009

$

15,000

3/1/2009

6/30/2009

$

21,000

St. Clair County Resa Marysville

(same as above) St. Clair Cty RESA - Technical Education Center St. Clair County RESA - Woodland Development Center

6/9/2009

6/1/2010

$

25,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

Distance learning equipment

4/1/2009

6/30/2009

$

35,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

Expansion of video server

2/1/2009

5/30/2009

$

45,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

SIS connection with data director

6/1/2009

8/1/2009

$

45,000

St. Clair County Resa Marysville

Texbook manager software

6/1/2009

8/1/2009

$

48,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use St. Clair Cty RESA - Technical Education Center, Admin & Woodland

3/1/2009

6/1/2009

$

50,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

SQL licensing upgrade

7/1/2009

11/30/2009

$

50,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

Library software upgrade

4/20/2009

5/31/2009

$

60,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

Raistor transportation maps

3/15/2009

7/15/2009

$

60,000

St. Clair County Resa Marysville

Upgrade of video production studio

2/1/2009

7/1/2009

$

60,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use St. Clair Cty RESA - Technical Education Center, Admin & Woodland

Laptop cart upgrades, Admin, TEC, Woodland

2/1/2009

7/1/2009

$

65,000

St. Clair County Resa Marysville

St. Clair Cty RESA - County-wide use

Cold storage for finance records

6/1/2009

12/30/2009

$

85,000

MCU Upgrade

4/1/2009

7/1/2009

$

85,000

St. Clair Cty RESA - Technical Education Ctr Upgrade student computers

2/1/2009

7/1/2009

$

85,000

St. Clair Cty RESA - County-wide use St. Clair County RESA - Woodland Development Center

Finance software upgrades, applicant, employee online

3/1/2009

8/1/2009

$

175,000

Traffic Safety - Extend entrance/exit for special needs bus loop

6/1/2009

6/1/2010

$

200,000

Transportation software upgrade

3/15/2009

7/15/2009

$

350,000

St. Clair County Resa Marysville Ingham ISD Mason

St. Clair Cty RESA - County-wide use St. Clair County RESA - Woodland Development Center & TEC Center Ingham ISD - District Wide

Backup Generators Installation of new energy efficient parking lot and site lighting systems

6/9/2009 5/9/2009

6/1/2010 9/9/2009

$ $

700,000 192,000

Ingham ISD

Ingham ISD - District Wide

Repave exisitng parking lots and improve site drainage to greener standards.

7/9/2009

10/1/2010

$

1,900,000

St. Clair County Resa Marysville St. Clair County Resa Marysville St. Clair County Resa Marysville

m b u

St. Clair County Resa Marysville

St. Clair Cty RESA - Admin

St. Clair County Resa Marysville St. Clair County Resa Marysville St. Clair County Resa Marysville St. Clair County Resa Marysville

Mason

02262009

S

ADA sidewalk repair

st

e u

Security cameras

eq

s

O N

R d

e t t

it

A T

Upgrade audio equipment in distance learning room Tec

Submitted Requests - Not Approved

PP

O R 4/1/2009

D VE

Route (Infrastructure Only)

546 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Ingham ISD

Mason

Ingham ISD - Thorburn Education Center

General remodel of existing 1969 building to also include but not limited to: Technology upgrades for 21st century learning applications including infrastructure upgrades to accommodate county wide data center infrastructure, back up generator for data center, sustainable/green HVAC design and building envelope improvements, further development of security systems to include video and all doors on lockdown system, removal of remaining asbestos, 5000 sq ft addition for distance learning conference rooms and storage area, accessibility. 7/9/2009

Ingham ISD

Mason

Ingham ISD - Secondary Learing Center

Build a 20,000 Sq Ft facility to for the Secondary Learning Center, and for the Evergreen student program which are currently located in aging modular classrooms. 7/9/2009

Ingham ISD - Heartwood School

General remodel of existing 1978 building to also include but not limited to: Technology upgrades for 21st century learning applications including infrastructure upgrades, condensing boiler to replace 1978 boiler, sustainable/green HVAC design and building envelope improvements, further development of security systems to include video and all doors on lockdown system, 10,000 sq ft addition for proper size special education rooms (SXI) and storage area, removal of remaining asbestos, accessibility. 7/9/2009

Ingham ISD

Mason

Expected Completion Date

D VE $

2,124,000

$

3,000,000

12/1/2010

$

3,072,000

Ingham ISD - Capital Area Career Center

General remodel of existing 1972 building and 1979 addition to also include but not limited to: Technology upgrades for 21st century learning applications including infrastructure upgrades, condensing boilers to replace package boiler system, sustainable/green HVAC design and building envelope improvements, further development of security systems to include video and all doors on lockdown system, renovation to culinary arts to expand into current SLC, 2000 sq ft addition to cosmetology, 500 sq ft entrance addition, proper size energy efficient overhead doors to automotive areas, renovate existing auto body classroom and lab area, 2000 sq ft storage room addition, removal of remaining asbestos, REMC/printshop area redesign, accessibility. 7/9/2009

12/1/2010

$

4,092,000

LCS/Schickler Elem.

Install geothermal heating and cooling system; replace existing windows; increase electrical service capacity, building remodeling to accomodate geothermal; asbestos abatement; remodel existing classrooms. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009

8/31/2010

$

2,939,063

Install geothermal heating and cooling system; replace existing windows; increase electrical service capacity, building remodeling to accomodate geothermal; asbestos abatement; remodel existing restrooms and classrooms; add a new building entrance. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009

8/31/2010

$

3,379,118

8/31/2010

$

3,398,175

8/31/2010

$

878,625

8/31/2010

$

977,625

8/31/2010

$

2,103,750

T O

12/1/2010

Funding Request

P P A

O R 12/1/2010

Route (Infrastructure Only)

N s

Ingham ISD

Mason

Lapeer Community Schools

Lapeer Community Schools

Lapeer Community Schools Lapeer Community Schools Lapeer Community Schools Lapeer Community Schools

Mayfield Township

Mayfield Township

t i m

d e tt

LCS/Lynch Elem.

t s e

qu

e R

Mayfield Township

LCS/Mayfield Elem.

Mayfield Township

LCS/Mayfield Elem.

Mayfield Township

LCS/Lynch Elem.

Install geothermal heating and cooling system; replace existing windows; increase electrical service capacity, building remodeling to accomodate geothermal; asbestos abatement; remodel existing classrooms. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009 Site improvements: playfield improvements, site lighting, pavement rehabilitation; technology; furniture and loose equipment; kitchen equipment. 6/30/2009 Site improvements: playfield improvements, site lighting, pavement rehabilitation; technology; furniture and loose equipment; kitchen equipment. 6/30/2009

LCS/Schickler Elem.

Building additions: physical education classroom; site improvements - playfield improvements, site lighting, and pavement rehabilitation; furniture and loose equipment, kitchen equipment; technology.

b u S

Mayfield Township

02262009

Submitted Requests - Not Approved

8/24/2009

547 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Mayville Community School District

Project Name

Project Description

Start Date

Expected Completion Date

The renovation of and addition to our 41 year old gymnasium. This would include renovation of locker rooms and shower facilities for boys and girls. Replacement of the gym floor. Replacement of PA and Scoreboards. The replacement of the orignal wood bleachers. The addition of locker room and shower facilities for boys and girls. Mayville Community School District - Mayville The addition of storage facilities and concession area. The addition of gym area for High School class use. The renovation of the building's energy management system. 9/1/2009

Mayville

Upgrade HVAC systems. The current boilers at the MHS are in need of replacement. They are original and not energy efficient. Not all of the systems are on the energy management program. We will replace the current boilers and domestic hot water systems with new Energy efficient models. The current Circon operating system will be updated to control all of the systems to reduce energy costs. 7/1/2009

6/30/2010

Funding Request

D VE $

2,750,000

8/28/2009

$

375,000

8/28/2009

$

375,000

9/1/2009

$

425,000

O R

Melvindale-North Allen Park Schools Melvindale

Melvindale-Northern Allen Park Melvindale High School

Melvindale-North Allen Park Schools Melvindale

Upgrade HVAC systems. The current boilers at the MHS are in need of replacement. They are original and not energy efficient. Not all of the systems are on the energy management program. We will replace the current boilers and domestic hot water Melvindale-Northern Allen Park Strong Middle systems with new Energy efficient models. The current Circon operating system will School be updated to control all of the systems to reduce energy costs. 7/1/2009

Melvindale-North Allen Park Schools Melvindale

Melvindale-Northern Allen Park Melvindale High School

Provide a Science lab as required by the State of Michigan to teach the required course. Due to limited class space we will need to construct a 2,000 sq.ft. Chemistry/Science Wing to meet the new high school graduation requirements. The National Science Teachers Association suggest a minimum of 60 sq. ft per student. The classroom would be compliant with all new codes. The classroom would be constructed at the current MHS and would be accessible through the current student passageways. Some additional plumbing, electrical and Technology upgrades would be required but are available. 7/1/2009

Melvindale-North Allen Park Schools Melvindale

Add 2 Technology classrooms. Currently we are using 7 portable classrooms due to lack of space. We propose at replace 2 of the units that are over 10 years old with an addition to the building. The new rooms would be current with all state and Federal Melvindale-Northern Allen Park Rogers Early codes. The old units are not energy or safety compliant. This would add an additiona 2,000 sq. ft. to the building. 7/1/2009 Elementary

5/30/2010

$

750,000

Melvindale-North Allen Park Schools Melvindale

Technology and safety Upgrades… In order to keep with current teaching methods classrooms need to be modernized for the advanced technology required to teach students. All classrooms will be upgraded to wireless internet, video streaming, and cable TV access. We will also upgrade our Fire Alarm systems to be compliant with current State Fire codes. Classrooms will be equipped with telephones for safety and Melvindale-Northern Allen Park Rogers Early better communications with parents. Bell systems and P.A. systems will also be Elementary included. 7/1/2009

9/1/2009

$

200,000

9/1/2009

$

250,000

T O

02262009

N s

t s e

u q e

R d

e t tt

i m

ub

Melvindale-North Allen Park Schools Melvindale

P P A

S

Melvindale-Northern Allen Park Melvindale High School

Technology and safety Upgrades… In order to keep with current teaching methods classrooms need to be modernized for the advanced technology required to teach students. All classrooms will be upgraded to wireless internet, video streaming, and cable TV access. We will also upgrade our Fire Alarm systems to be compliant with current State Fire codes. Classrooms will be equipped with telephones for safety and better communications with parents. Bell systems and P.A. systems will also be included. 7/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

548 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Melvindale-North Allen Park Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools

Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Melvindale

Technology and safety Upgrades… In order to keep with current teaching methods classrooms need to be modernized for the advanced technology required to teach students. All classrooms will be upgraded to wireless internet, video streaming, and cable TV access. We will also upgrade our Fire Alarm systems to be compliant with current State Fire codes. Classrooms will be equipped with telephones for safety and Melvindale-Northern Allen Park Strong Middle better communications with parents. Bell systems and P.A. systems will also be School included. 7/1/2009

Memphis

Memphis Transportation

Programmable Thermostats for Heating System

6/1/2009

Memphis

Memphis Admin. Renovations

Energy Efficient Hot Water Tank on Demand

6/1/2009

Memphis

Memphis Admin. Renovations

Update heating system for Efficiency

6/1/2009

Memphis

Memphis Admin. Renovations

Energy Efficient Lighting (23 lights)

Memphis

Memphis Admin. Renovations

Insulation throughtout building ($2 sq. ft. times 3500 sq. ft.)

Memphis

Memphis Transportation

Energy Efficient Lighting

Memphis

Memphis Admin. Renovations

Add Energy Efficient Storage Area (1,000 Sq. Ft.)

Memphis

D VE $

250,000

$

1,000

PP

$

2,000

$

3,500

6/1/2009

$

5,635

6/1/2009

$

7,000

8/1/2009

$

8,000

8/1/2009

$

120,000

Memphis Admin.

New Administration Building and Storage - Not efficient based anymore. Based on 3500 Sq. Ft - district has Architect on Contact to meet the 90/120/180 (Designs have not been drawn due to lack of money on new construction) 8/1/2009

$

600,000

Memphis

Memphis Elementary

HVAC Geo Thermal Energy

6/1/2009

$

3,000,000

Memphis

Memphis JH/SH

HVAC Geo Thermal Energy

6/1/2009

$

3,000,000

Memphis

Memphis Admin. Renovations

UPS for Power (7 x $150)

6/1/2009

$

1,050

Memphis

Memphis Elementary

Laptops (1 x $1500)

6/1/2009

$

1,500

Memphis

Memphis Admin. Renovations

Insulated Blinds

6/1/2009

$

3,000

Memphis

Memphis JH/SH

Laptops (2 x $1500)

6/1/2009

$

3,000

Memphis

Memphis Elementary

Server

6/1/2009

$

5,000

Server

6/1/2009

$

5,000

Memphis Elementary

Desktop Computers (4 x $1300)

6/1/2009

$

5,200

Memphis Admin. Renovations

Weather Proof Doors (2 Doors)

6/1/2009

$

6,000

Memphis Admin. Renovations

Computers (7 x $1300)

6/1/2009

$

9,100

Memphis

Memphis Elementary

Interior Wall Painting (Wages and Paint)

6/1/2009

$

10,000

Memphis

Memphis Elementary

Upgrade Baseball Field behind Elementary School

8/1/2009

$

10,000

Memphis

Memphis Elementary

Network Wiring

6/1/2009

$

15,000

m b u

Memphis

Memphis JH/SH

Memphis Memphis Memphis

02262009

S

O N

R d

e t t

it

st

e u

eq

s

A T

Submitted Requests - Not Approved

9/1/2009

Funding Request

O R

Route (Infrastructure Only)

549 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Menominee Area Public Schools

Location City or Township

Project Name

Project Description

Start Date

Funding Request

Memphis

Memphis JH/SH

Network Wiring

6/1/2009

$

15,000

Memphis

Memphis Admin. Renovations

Carpet with Insulated Pad ($5 sq ft times 3500 sq. ft.

6/1/2009

$

17,500

Memphis

Memphis Elementary

Wireless Network Access

6/1/2009

$

20,000

Memphis

Memphis JH/SH

Wireless Network Access

6/1/2009

$

20,000

Memphis

Memphis Admin. Renovations

New Ceilings $8 sq. ft x 3500 sq. ft.

6/1/2009

$

28,000

Memphis

Memphis Elementary

Apple Mac book Learning Lab (20 Laptops)

6/1/2009

30,000

Memphis

Memphis JH/SH

Basketball Court/Ice Skating

8/1/2009

$

30,000

Memphis

Memphis Elementary

TV's Blu Ray (40 x $1500)

PP

$

6/1/2009

$

60,000

Memphis

Memphis JH/SH

TV's Blu Ray (40 x $1500)

6/1/2009

$

60,000

Memphis

Memphis JH/SH

Desktop Computers (50 x $1300)

6/1/2009

$

65,000

Memphis

Memphis Admin. Renovations

Foundation Repairs

6/1/2009

$

67,200

Memphis

Memphis Elementary

Projectors (40 x $2,000)

6/1/2009

$

80,000

Memphis

Memphis JH/SH

Projectors (40 x $2000)

6/1/2009

$

80,000

Memphis

Memphis District Wide

Senior Citizen Lunch/Dinner Program with Kitchen Staff (1 year wages and food)

8/1/2009

$

100,000

Memphis

Memphis Elementary

Smart Boards (40 x $3000)

6/1/2009

$

120,000

Memphis

Memphis JH/SH

Smart Boards (40 x $3000)

6/1/2009

$

120,000

Memphis

Memphis District Wide

Extend Pole Barn/Dry Storage (40 x 40 Addition - $80 sq. ft)

8/1/2009

$

128,000

Memphis

Memphis JH/SH

Lights on Baseball & Softball Fields

8/1/2009

$

250,000

Memphis

Memphis JH/SH

Air Conditioning Gym & Cafeteria

8/1/2009

$

300,000

Memphis

Memphis Elementary

Purchase & Install Playground Equipment

6/1/2009

$

500,000

8/1/2009

$

1,000,000

Menominee Area Public Roofing

Artificial Turf - Football Field Project will reconstruct roofs and replace insulation in areas where our roofs are 15 years old

$

2,100,000

Menominee Area Public Technology infrastructure and smart classrooms

Project will update/replace existing technology infrastructure in all district facilities. It will include intelligent switches/switching, voice over IP technology with handsets for all teaching stations in buildings, coordinated security cameras and recording systems, card access building security, wireless internet access from all district locations, and smart classrooms including projectors, smart board technology, video AugustAugust-and audio capabilities and allow for future modification/expansion. September, 2009 September, 2010

$

2,500,000

Haslett Public Schools High School

Installation of 22 security camera's at Haslett High School. Included in the project are all necessary hardware and software to support the camera system including wiring and electrical. 3/1/2009

$

97,320

m b u

Memphis

Memphis JH/SH

Menominee

Menominee

Haslett Public Schools Meridian Township

02262009

s

O N

R d

e t t

it

eq

A T

st

e u

S Menominee Area Public Schools

Expected Completion Date

Submitted Requests - Not Approved

O R

June-July, 2009

D VE

SeptemberOctober, 2009

6/30/2009

Route (Infrastructure Only)

550 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Haslett Public Schools Meridian Township Mesick Consolidated Schools Mesick

Lapeer Community Schools Lapeer Community Schools Thornapple Kellogg School District Thornapple Kellogg School District Thornapple Kellogg School District Thornapple Kellogg School District Thornapple Kellogg School District Thornapple Kellogg School District Thornapple Kellogg School District Bullock Creek School District

Project Name

Project Description

Haslett Public Schools High School

Metamora Township

Metamora Township

7/15/2009

$

251,250

MesickElem & M.S Roof Replacements

Sept, 2018

$

400,000

LCS/Murphy Elem.

Install geothermal heating and cooling system; replace existing windows; increase electrical service capacity, building remodeling to accomodate geothermal; asbestos abatement; remodel existing classrooms. We are committed to green systems. LCS has retrofitted 2 buildings with geothermal systems recently and a third will start this summer. 6/30/2009

8/31/2010

$

2,473,763

8/31/2010

$

3,982,275

8/1/2009

$

86,000

6/1/2009

8/1/2009

$

110,000

6/1/2009

8/1/2009

$

160,000

$

1,000,000

Building additions: Classroom addition and physical education classroom; site improvements - playfield improvements, site lighting, and pavement rehabilitation; furniture and loose equipment, kitchen equipment; technology 8/24/2009 The track used by both our physical education and athletic departments needs to be resurfaced. 6/1/2009

Middleville Middleville

Thornapple Kellogg Technology

Middleville

Thornapple Kellogg Learning Center

Middleville

Thornapple Kellogg Schools/Page Elementary Replace Roof Thornapple Kellogg Maint/Transportation Complex Resurface parking lot

Middleville

Middleville

Midland

Milan Area Schools

Milan

Huron Valley Schools

Milford

Huron Valley Schools

Milford

Milan Area Schools Huron Valley Schools - Baker Elementary School Huron Valley Schools - Kurtz Elementary School

Huron Valley Schools

Milford

Huron Valley Schools - Muir Middle School

Huron Valley Schools

Milford

Huron Valley Schools

Milford

Huron Valley Schools

Milford

Huron Valley Schools

Milford

Huron Valley Schools

Milford

02262009

d e t

A T

One wing of the High School needs a roof replacement

Extra square footage is needed in two classrooms at McFall Elementary.

O N

Replacement and purchase of District Technology over the next 2 years Tiles in three classrooms need to be removed as they are lifting and may contain asbestos.

Bullock Creek Bullock Creek School District

s

st

PP

O R

n/a 6/1/2009

8/1/2009

$

25,000

6/1/2009

8/1/2009

$

100,000

6/1/2009

8/1/2009

$

180,000

$

8,670,000

$

49,165,000

Partially remodeling, refurnishing and re?equipping school buildings; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving the tennis courts and sites.

e u

q e R

D VE

remodeling, refurnishing and re-equipping existing school buildings; erecting, furnishing and equipping additions to school buildings; constructing a new transportation building; acquiring and installing education technology improvements; purchasing school buses and developing and improving playgrounds, athletic fields and facilities and sites.

Replace portion of roof with higher insulation value

6/15/2009

9/1/2009

$

190,000

Replace entire roof with higher insulation value

6/15/2009

9/1/2009

$

365,000

Replace domestic water heater and pumps

6/15/2009

9/1/2009

$

60,000

Huron Valley Schools - Milford High School

Replace fire alarm system

6/15/2009

9/1/2010

$

150,000

Huron Valley Schools - Milford High School Huron Valley Schools - Johnson Elementary School

Replace lighting in aux gym, main gym and pool to T5 fixtures

6/15/2009

9/1/2010

$

200,000

Replace ceilings and upgrade lighting to more energy efficient lighting (partial)

6/15/2010

9/1/2010

$

55,000

Huron Valley Schools - Muir Middle School Huron Valley Schools - Kurtz Elementary School

Replace ceilings and upgrade lighting to more energy efficient lighting

6/15/2010

9/1/2010

$

300,000

Replace ceilings and upgrade lighting to more energy efficient lighting

6/15/2010

9/1/2010

$

350,000

tt i m

ub

S

Funding Request

40,200 square foot roof replacement at the High School 6/8/2009 Both Elementary and Middle School Buildings will require roof replacement in the next 2-3 years to maintain the buildings June, 2010

LCS/Murphy Elem. Thornapple Kellogg Schools High School Track Thornapple Kellogg Schools High School Roof Repair Thornapple Kellogg McFall Elementary Classrooms

Middleville

Start Date

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

551 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bay-Arenac ISD

Bay-Arenac ISD

Monitor Township

Monitor Township

Monroe Public Schools Monroe

Monroe Public Schools Monroe Montague Area Public Schools Montague Montague Area Public Schools Montague

7/1/2010

Bay-Arenac ISD

Remodel Dental Hygienist and Computer Networking Technology class rooms at Career Center. These programs provide necessary training for students in high demand career areas.

8/1/2010

Monroe Community Schools

Remodeling, equipping, furnishing, reequipping and refurnishing existing School District buildings, including code and safety improvements, plumbing, electrical work and climate controls; constructing, furnishing and equipping additions to existing School District buildings, including science and technology classrooms, offices, and additional classrooms district-wide, and a new operations buildings; acquiring and installing technology equipment in new additions to School District buildings; improving and developing sites, including athletic facilities, fields and playgrounds in the School District. The estimated millage to be levied in 2004 to service this issue of bonds is 2.95 mills ($2.95 per $1,000 of taxable value) and the estimated simple average annual millage rate required to retire the bonds of this issue is 2.23 mills ($2.23 per $1,000 of taxable value). The bonds may be issued in one or more series, payable in the case of each series is not to exceed 30 years from the date of issue of each series. 6/1/2009

Monroe/Districtwide

The following cost projections are for roofing,doors and windows,concrete repair,fence repair,parking lot repair,seating repair,mechanical repairs (boilers,pumps,compressors,controls,electrical repairs (lighting upgrades, generator,service panels) 2010

Montague Elementary

itt

m b u

S

Atlanta

T O

s t s

8/1/2009

D VE $

500,000

$

700,000

8/15/2011

$

83,000,000

2012

$

70,628,800

9/1/2011

$

1,327,000

9/1/2011

$

1,389,000

9/1/2011

$

4,415,000

$

20,945,000

$

240,000

O R

-N

e u

green roof, solar louvers, security and ada improvements, air conditioning, upgrade energy management system, geo-themal heating cooling system, heat exchanger system, HVAC, remodel one classroom for learning lab, software, hardware, room renovation, electrical outlets, instructional technology, sound enhancement

9/1/2009

addition to the early childhood center and new locker room addition at the middle school. remodeling, technology equipment and site work at the early childhood center, elementary, middle and high school. new mechanical controls at the alternative school, new busses.

Roof replacement-60,000 Sq Ft @ $4.00

6/1/2009

009/30/2009

Constructing, furnishing and equipping a community athletic facility, to include lighting, football field, handicap accessible bleachers, press box, track and restroom facilties.

$

1,675,000

Morrice Area Schools

constructing, equipping, developing and improving athletic fields and facilities; erecting and equipping an addition to the bus garage facility; and developing and improving sites.

$

2,295,000

Morrice

Morrice Area Schools

Morrice

Morrice dug-outs

Morrice Area Schools

Morrice

Morrice Area Schools

Morrice

5/1/2010

6/1/2010

$

20,000

Morrice baseball fields

re-construct dug-outs for each of our ball fields clear current wooded area and grade to create baseball fields for school and community use

5/1/2010

9/1/2010

$

25,000

Morrice tennis courts

refurbish current tennis courts

5/1/2010

7/1/2010

$

25,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

Window replacement, solar louvers, remodel one classroom for learning lab, software, hardware, room renovation, air conditioning, door hardware, green roof 9/1/2009 solar louvers at select windows, remodel one classroom for learning lab, software, hardware, room renovation, generator, green roof 9/1/2009

q e R

Funding Request

Morrice Area Schools

Morrice Area Schools

02262009

d e t

Montague Area Public Schools

Morrice

Start Date

Bay-Arenac ISD

Montague High School

Montague Area Public Schools Montague Atlanta Community Schools Montmorency

Project Description

Building on a $75,000 grant from the State of Michigan Bay-Arenac is developing an alternative energy component to many of our career center programs. Bay-Arenac will construct an energy producing windmill. This windmill will provide renewable energy and training opportunities for our students. 8/1/2009

Montague Middle School

Montague Area Public Schools Montague

Morrice Area Schools

Project Name

Expected Completion Date

552 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Morrice Area Schools

Morrice

Morrice concession stand

build a new consession stand for our athletic program

5/1/2010

8/1/2010

$

50,000

Morrice Area Schools

Morrice

Morrice playground

update our current playground to current safety standards

5/1/2010

8/1/2010

$

50,000

Morrice Area Schools

Morrice

Morrice track

facilities and equipment to create a "track" program

5/1/2010

9/1/2010

$

250,000

Morrice Area Schools

Morrice

Morrice paving

5/1/2010

8/1/2010

$

300,000

$

300,000

8/31/2009

$

120,000

5/5/2009

8/31/2009

$

278,000

5/5/2009

8/31/2009

$

100,000

D VE

Morrice Area Schools

Morrice

Morrice bus compound

create additional parking lots for our students and community update our current bus garage and compound area with new pole barn, fencing, electrical hook-ups for buses, etc.

Mt. Clemens Community School District

Mount Clemens

Mount Clemens Community School District

Energy efficient lighting upgrades.

Mt. Clemens Community School District

Mount Clemens

Mount Clemens Community School District

Energy efficient boiler replacements

Mt. Clemens Community School District

Mount Clemens

Mount Clemens Community School District Early Childhood Center

Provide restroom facilities for pre-school programs.

Mt. Clemens Community School District

Mount Clemens

Mount Clemens Community School District Mount Clemens Junior High

Renovate all 7th and 8th grade classrooms with whiteboards, flooring, ceilings; two science labs, special education rooms, professional rooms and restroom facilities.

5/5/2009

8/31/2009

$

500,274

Mt. Clemens Community School District

Mount Clemens

Mount Clemens Community School District Mount Clemens High School

Renovate classrooms for Creative Arts and Communications Small Learning Academy and media center

5/5/2009

1/31/2010

$

1,572,802

Mt. Clemens Community School District

Mount Clemens

Mount Clemens Community School District High School

Provide secure entry vestibule, remodel planetarium with technology upgrades and remove deteriorating boiler stack.

5/5/2009

11/30/2009

$

270,000

Mount Clemens

Mount Clemens Community School District

5/5/2009

8/31/2009

$

600,000

Mt Morris Township

Beecher-Dailey Elem

6/15/2009

7/31/2009

$

150,000

8/15/2012

$

16,454,000

Mt. Clemens Community School District Beecher Community School District

d e tt

t i m

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Consolidated Schools

ub

Mt. Morris Consolidated Schools Mt. Morris Mt. Morris Consolidated Schools Mt. Morris

Beecher Community School District Beecher Community School District

S

Mt. Morris Township

Mt. Morris Township

02262009

s t s

P P A 5/5/2009

T O

-N

e u

q e R

O R

3/1/2010

Provide technology upgrades to the district. Replacement of Courtyard and Corridor Windows for greater efficiency with heating and cooling and reduction in energy costs.

Erecting, furnishing, and equipping a new middle school building; acquiring, installing and equipping the new building for technology; and preparing and developing the site, including athletic fields and playgrounds. It is estimated that 5.31 mills ($5.31 per $1,000 of taxable value) will be levied in 2000 for all debt of which an estimated 5.31 mills will be allocated to this issue. The bonds shall be repaid over a maximum period of 27 years with an estimated simple average annual levy of property taxes of 4.48 mills ($4.48 per $1,000 of taxable value). 6/1/2009

10/1/2010

Mt. Morris Junior High

Electrical Work: Lighting, Fire Alarms, Clock System,PA system, lights, service,power

$

208,320

Mt. Morris Central Elementray

Sitework, General Building Work, Exterior/Interior, Mechanical, Electrical, restroom Renovations, Handicap Accessibilty,

$

4,854,785

Beecher - Dailey Elementary

Renovation of four gang restrooms serving entire building. Seeking more efficient fixtures, easier cleaning, reduced maintenance, water conservation, and replacement of paper towels with air dryers. Also seeking surfaces that reduce vandalism. 7/15/2009

9/30/2009

$

250,000

Beecher - High School/ Middle School

Replacement of Corridor Windows and Replacement of classroom windows in three wings. Building constructed in 1967. Seeking reduction in heat loss, better lighting, better security. Overall energy conservation.

9/15/2009

$

700,000

Submitted Requests - Not Approved

6/15/2009

Route (Infrastructure Only)

553 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Westwood Heights Schools Westwood Heights Schools Westwood Heights Schools Westwood Heights Schools Westwood Heights Schools

Location City or Township Mt. Morris Township Mt. Morris Township Mt. Morris Township Mt. Morris Township Mt. Morris Township

Mt. Morris Consolidated Schools Mt. Morris Township

Project Name Westwoods Heights Schools Hamady High/Middle School Westwoods Heights Schools Hamady High/Middle School Westwoods Heights Schools Administration Building Westwoods Heights Schools Hamady High/Middle School Westwoods Heights Schools Hamady High/Middle School

Project Description

Start Date 7/1/2009

8/20/2009

$

65,000

Ceiling Tile Replacement

7/1/2009

8/20/2009

$

80,000

Heating and Cooling System (New Boiler and Cooling Unit)

7/1/2009

8/20/2009

$

120,000

Heating and Cooling System (New Boiler and Cooling Unit)

7/1/2009

8/1/2009

$

180,000

New Roof

7/1/2009

$

220,000

$

544,875

$

12,500,000

$

23,690,000

Electrical Work: Lighting, Fire Alarms, Clock System,

Muskegon City School District Muskegon

Muskegon City School District

remodeling, equipping and re-equipping and furnishing and re-furnishing school buildings; acquiring, installing and equipping technology for school buildings; purchasing school buses; constructing, remodeling and improving athletic facilities; and developing and improving a site

Reeths-Puffer Schools Muskegon

Reeths-Puffer Schools

New entrance canopy, roof replacement, remodel flooring, mechanical upgrades, office remodeling, site improvements, instructional technology upgrades, buses.

Oakridge Public Schools

Muskegon

Oakridge Public Schools, Elem

Create summer job program for our At Risk Students - they would work during the summer - 55 students would work 10 hours a week for 8 weeks.

Maple Valley Schools

Nashville

Maple Valley Schools, Kellogg Alt Ed

Maple Valley Schools

Nashville

Maple Valley Schools Maple Valley Schools Anchor Bay School District Anchor Bay School District Anchor Bay School District Anchor Bay School District Anchor Bay School District Anchor Bay School District

Huron School District

Funding Request

Auditorium Seating & Lighting

Mt. Morris, Elisabeth Ann Johnson High School

Anchor Bay School District

Expected Completion Date

T O

-N

O R 8/30/2009

P P A

D VE

No

8/14/2009

$

25,000

6/1/2009

8/1/2009

$

150,000

Maple Valley Schools, Fuller Elem

Window Replacement Boiler replacement, replacement of outdated Classroom Heat & Ventilating, Update Energy Management System, Window Replacement

6/1/2009

10/1/2009

$

650,000

Nashville

Maple Valley Schools, Fuller Elem

Security Improvments, Remodel Entrance

6/1/2009

2010

$

75,000

Nashville

Maple Valley Schools, Fuller Elem

Parking Lot repair/replacement, Additional Parking Lot Lights

6/1/2009

8/1/2009

$

150,000

New Baltimore

Catch Basin Replacement

4/3/2009

10/2/2009

$

18,000

New Baltimore

Anchor Bay School District All Buildings Anchor Bay School District Maintenance Garage

Replace doors and roof

4/9/2009

10/8/2009

$

54,000

New Baltimore

Anchor Bay School District Ashley Elementary Parking lot replacement

4/5/2009

10/4/2009

$

90,000

New Baltimore

Anchor Bay School District Lottie Elementary Parking lot replacement Anchor Bay School District Lighthouse Elementary Roof Replacement Anchor Bay School District Transportation Garage Bus parking lot replacement

4/6/2009

10/5/2009

$

100,000

4/8/2009

10/7/2009

$

100,000

4/4/2009

10/3/2009

$

117,000

Anchor Bay School District All Buildings

Energy Conservation Plan to add occupancy sensors in classrooms and other areas, separate electrical circuits to allow zoning, programmable controls, insulate plumbing fixtures, enhance boiler efficiency, upgrade building management systems, replace fixtures with more efficient fixtures 4/1/2009

9/30/2009

$

1,918,992

Huron Schools, Renton Junior High School

March 1, 2009, could be 30 days The School District would install 30 A-Frame ventilation and A/C units. The present or less, the District needs only heating units were retrofitted for these units prior to installation. This project would to bid and award improve the air quality of the learning environment. The installation of these units 6/30/2009 would also allow the school district to consider an extended school year for students. the work.

$

280,000

New Baltimore

tt i m

d e t

b u S

New Baltimore

New Baltimore

New Boston

02262009

s t s

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

554 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Huron School District

Huron School District

New Boston

New Boston

Project Name

Project Description

Start Date

Huron Schools, Huron High School

The District would convert over 3,000 square feet of existing space into three modern classrooms that would meet the new "21st Century Green High-Performing Public School Facilities" standards. This project would provide much needed relief to an overcrowding situation at Huron High School. The project designs are already completed, all blueprints and detailed budgets were completed by French Associates of Ann Arbor, Michigan.

March 1, 2009, could be 30 days or less, the District needs only to bid and award the work. 6/30/2009

Huron Schools, Sunnyside Kindergarten Center

April 1, 2009 The School District is moving forward with All Day Everyday Kindergarten for every could be 30 days student in the school district this Fall. Therefore, the Sunnyside Kindergarten Center isor less, the in need of many major renovations. Sunnyside Kindergarten Center is in need of a District only needs high efficiency roof, energy efficient boiler, doors and lighting. Univentilators would be to bid and award installed for an improved air quality and learning environment. the work. 6/30/2009

Huron Public Schools

Constructing, erecting, furnishing and equipping a new highschool, including equipping for technology and acquiring and installing technology therein and preparing, developing and improving a site therefor, including outdoor physical education and athletic fields and facilities; Constructing, ereicting, furnishing, and equipping, including equipping for technology and acquiring and installing technology therein, an addition o additions to and partially remodeling, refurnishing, and reequipping the existing high school for use as a junior high school, the existing junior high school for use as an elementary school, the existing Brown elementary school, the existing Miller elemenatry, and the existing Sunnyside Kindergarten Center, and the preparation, development and improvement of sites for those schools, including playgrounds; Constructing, erecting, furnishing and equipping and requipping, an addition or additions to and partially remodeling the existing maintenance and transportation facilities, including preparation, development and improvement of the sites for those facilities 6/1/2009

Huron School District

Huron School District

Huron School District

New Haven Community Schools

New Boston

New Boston

Huron Schools, Sunnyside Kindergarten Center

New Boston

$

575,000

8/15/2012

$

65,000,000

The School District would mill and resurface approximately 56,000 square feet of April 1, 2009, existing parking lot and roadway. Needed curbing would also be installed. This project could be 30 days will also help prevent parking lot run off into the Huron River, which is less then 500 or less to prepare feet of the school site. and award bids. 6/30/2009

$

95,000

The School District would and resurface approximately 70,000 square feet of existing April 1, 2009, parking lot and roadway. Needed curbing would also be installed. This project will alsocould be 30 days help prevent parking lot run off into the Huron River, which is less then 500 feet of the or less to prepare school site. and award bids. 6/30/2009

$

125,000

The School District would mill and resurface approximately 80,000 square feet of April 1, 2009, existing parking lot and roadway. Needed curbing would also be installed. This project could be 30 days will also help prevent parking lot run off into the Huron River, which is less then 500 or less to prepare feet of the school site. and award bids. 6/30/2009

$

140,000

$

1,800,000

O R

New Boston

u S New Haven

02262009

t s e

it

bm

PP

Huron Schools, Renton Junior High School

Route (Infrastructure Only)

O N

u q e

R d

e t t

D VE

317,000

s

Huron Schools, Huron High School

Funding Request

$

A T

Romulus Community Schools

Expected Completion Date

A project which will probably not be addressed as a result of the construction of the wastewater treatment project is the air conditioning of the High School. Most school buildings were not constructed with the comfort of the students in mind and with need for additional air circulation, changes in school days, and in all likelihood the extension New Haven Schools - Air Conditioning of New of the school year, the comfort of the students and public would be addressed by air Haven High School conditioning the high school. June, 2009

Submitted Requests - Not Approved

June, 2010

555 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

New Haven Schools-Construction of a new Bus Garage

We are currently the smallest school district in Macomb County, yet we still have 13 daily bus routes (including home-to-school, vocational education, advanced placemen programs, and special education). Our bus garage is an embarrassment. Currently, a bus cannot fit inside the bus garage in order to do simple or routine maintenance. In the winter, just to change the oil, at least 8-10 feet of the bus must stick outside of the building. There is enough land at the location of our new middle school for construction of a new bus garage. This will get the facility out of the Village and away from a residential area. June, 2009

Newaygo County Resa Newaygo

NC RESA Newday

Repair/replace electrical wiring & lighting systems

Newaygo County Resa Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District Newaygo Public School District

Newaygo

NC RESA Newday

Newaygo

Upper Elementary

Newaygo

Elementary

Newaygo

High School

Newaygo

Community Education

Bring the Newday building into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance 6/1/2009 Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system 6/1/2009 Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system 6/1/2009 Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system 6/1/2009 Improve wireless technologies, infrastructure and upgrades including fiber optics and computers 6/1/2009

Newaygo

High School

Renovate classrooms to install technology for 21st Century Learning

Newaygo

Middle School

Newaygo

Middle School

Newaygo

Elementary

Newaygo

High School

Newaygo

Upper Elementary

Newaygo

Upper Elementary

Newaygo

Elementary

New Haven Community Schools

O R

D VE

3,335,000

$

109,312

$

68,320

$

800,000

$

1,100,000

$

1,400,000

$

150,000

5/1/2009

$

200,000

Renovate classrooms to install technology for 21st Century Learning Improve wireless technologies, infrastructure and upgrades including fiber optics and computers Improve wireless technologies, infrastructure and upgrades including fiber optics and computers Improve wireless technologies, infrastructure and upgrades including fiber optics and computers Improve wireless technologies, infrastructure and upgrades including fiber optics and computers

5/1/2009

$

200,000

6/1/2009

$

250,000

6/1/2009

$

350,000

6/1/2009

$

500,000

6/1/2009

$

500,000

Renovate classrooms to install technology for 21st Century Learning

5/1/2009

$

500,000

$

500,000

6/1/2011

$

34,160

NC RESA Neway Center

Renovate classrooms to install technology for 21st Century Learning 5/1/2009 Improve wireless technologies, infrastructure and upgrades including fiber optics and computers 6/1/2009 Improve wireless technologies, infrastructure and upgrades including fiber optics and computers 6/1/2009

6/1/2011

$

119,000

Newaygo Public Schools - Middle School

Build Press box and storage areas for both baseball and softball fields - these fields are used by the High School athletic programs and the Community Recreation leagues

6/15/2009

Sept 30 2009

$

50,000

Niles

Remodel interior walk ways for energy savings at the high school

6/1/2010

9/1/2010

$

200,000

Niles

Remove and replace roofing according to roofing replacement schedule

6/1/2010

9/1/2012

$

1,000,000

Niles

Niles

Replaces old boilers with energy saving boilers, 20 boilers

6/1/2010

1/1/2011

$

2,400,000

Niles

Niles

6/1/2010

9/1/2010

$

1,200,000

Niles Township

Brandywine Middle/High School

Replace old science lab fixtures, furniture and equipment One wing of classrooms replacement; from 1961 addition (auto shop, wood shop, machine shop); to include windows, doors, service doors

6/1/2010

9/1/2010

$

100,000

m b u

Newaygo

Niles

02262009

eq

S

st

s

O N

R d

e t t

it

Newaygo County Resa Newaygo

Niles

A T

e u

NC RESA Newday

5/1/2009

Submitted Requests - Not Approved

PP

June, 2010

Funding Request

$

New Haven

Newaygo County Resa Newaygo

Newaygo Public School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Brandywine Community Schools

Expected Completion Date

6/1/2011

Route (Infrastructure Only)

556 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Brandywine Community Schools Brandywine Community Schools Northport Public School District Northport Public School District Northville Public Schools Norway-Vulcan Area Schools Norway-Vulcan Area Schools

Oak Park City School District

Location City or Township

Project Name

Niles Township

Brandywine Middle/High School

Niles Township

Project Description

Start Date

Expected Completion Date

Funding Request

6/1/2010

9/1/2010

$

350,000

Brandywine Merritt Elementary

Energy efficient windows in cafeteria area; upgrade heating services Multi-purpose room remodel; ceilings, tile floor (original gym and lunchroom for mid 60's

6/1/2010

9/1/2010

$

30,000

Northport

Northport Public

Technology thru out School

6/1/2009

9/9/2009

$

100,000

Northport

Northport Public

New elementary roof to help with leaking and heat escape.

6/1/2009

9/1/2009

$

120,000

Northville

Northville Public Schools

Erecting, furnishing and equipping a new elementary school; acquiring and installing educational technology improvements; acquiring land and developing and improving a plyground and the site? 6/1/2009

$

25,235,000

Norway

Norway-Vulcan Area Schools

Replace 800 T-12 flourescent lighting fixtures with T-8 flourescent fixtures.

7/30/2009

$

96,000

Norway

Norway-Vulcan Area Schools

Shingles covering 160,000 square feet of pitched roof over the school building must be replaced. Isolated portions of the roof need to have additional work performed because of failure of underlayment materials.

7/30/2009

$

600,000

Oak Park

Remodeling, reequipping, and refurnishing School District buildings, including security systems, life safety systems, barrier free, mechanical, electrical, energy conservation, food service facilities, classroom improvements and technology; Constructing, furnishing and equipping additions to School District buildings, including a cafeteria addition at the high school and vestibule additions at the middle school; and improving Portions of the 2008 Oak Park School District and developing sites, including storm drainage, parking and roadways, sidewalks, Bond Program structures, signage. 6/1/2009

12/1/2010

$

21,000,000

15,000

T O

P P A

O R

N s

st

June 8,2009

June 8,2009

8/15/2012

D VE

Rochester Community School District Oakland Twp

Rochester Community Schools - Delta Kelly Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

Onekama Consolidated Schools Onekama

Onekama Consolidated Schools

Outdoor restrooms/storage/concession building

6/9/2009

9/9/2009

Ontonagon Area Schools

Ontonagon Area Schools

Ontonagon

Ontonagon

tt i m

b u S

Ontonagon Area Schools

Brandon School District

Ortonville - Oakland County

Brandon School District

Evart Public Schools

Osceola Township

Evart High School

02262009

d e t

Ontonagon Area Schools

e u

$

350,000

Remodeling, equipping and re-equipping the middle/high school and vocational education building; and developing and improving the site.Remodeling, equipping and re-equipping the middle/high school and vocational educatin buidlings; acquiring and installing educatinal technology improvments at the middle/high school; and developing and improving the site.

$

1,705,000

remodeling, equipping and re-equipping, and furnishing and refurnishing the middle and high school building; constructing, equipping and furnishing an elementary wing addition to the existing middle and high school building; acquiring, installing, equipping and re-equipping the middle and high school building, including the new elementary wing addition, for technology; remodeling the vocational education building, remodeling and re-equipping athletic facilities; and developing and improving the site.

$

4,390,010

various - smaller projects 08/31/09 new elementary 1 year - 08/31/10

$

30,420,000

8/15/2009

$

39,100

q e R

Elementary replacement, technology enhancements, capcity enhancements, redundant server, wireless capacity exterior fencing, green school enhancements tennis courts, lighting and paving for walkways, drives, parking lots, mainentance pole barn and storages sheds, roof replacements, exterior brick replacements, band equipment, athletic equipment, carpet and tile replacements, science room upgrades and misc. painting. 4/1/2009 We would purchase some 17 inch flat panel displays, thin clients, and a PC for each classroom. 6/8/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

557 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Evart Public Schools

Osceola Township

Evart High School

We would put up a 50 foot wind turbine and an active solar panel system to generate electricity for our sustainable agriscience greenhouse and multi purpose maintenance building. 6/15/2009

Evart Public Schools

Osceola Township

Evart High School

We would install security cameras outside of the building and in the parking lot.

6/8/2009

8/8/2009

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Replace exterior doors with energy efficient doors and thermal, broken, aluminum doors and frames and access controls with a barrier free door access

7/10/2009

8/15/2009

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Construction of a science greenhouse classroom 6/15/2009 Replace floor tile throughout with green products that reduce life cycle costs of labor and chemical applications. 7/14/2009

Oscoda, Oscoda High School

Energy conservation lighting upgrade from T-12 to T-8 Lighting and from incandescent lights to high-pressure sodium and associated ceiling repair/replacement

Oscoda

Oscoda, Richardson Middle School

Construction of 16 classrooms that would allow the closure of Cedar Lake Elementary for reduced life cycle costs, increased economy of scale and reduction of energy and utilty consumption 6/15/2009

Overisel Township

Hamilton & Sandyview Elementary

conversion to T5 or T8 lighting fixtures

Overisel Township

Hamilton & Bentheim Elementary

conversion to T5 or T8 lighting fixtures

Overisel Township

Hamilton & Sandyview Elementary

geo-thermal heating & cooling system

Overisel Township

Hamilton & Bentheim Elementary

geo-thermal heating & cooling system

Overisel Township

Hamilton & Sandyview Elementary

Overisel Township

$

50,000

D VE $

16,500

$

38,000

$

122,000

P P A

8/1/2009

$

125,000

8/1/2009

$

147,000

8/25/2009

$

3,200,000

6/1/2009

8/1/2009

$

45,000

6/1/2009

8/1/2009

$

93,000

9/1/2009

2/1/2010

$

600,000

9/1/2009

2/1/2010

$

1,240,000

wireless data communications

6/1/2009

8/1/2009

$

60,000

Hamilton & Sandyview Elementary

security cameras and card access

6/1/2009

8/1/2009

$

75,000

Overisel Township

Hamilton & Bentheim Elementary

security cameras and card access

6/1/2009

8/1/2009

$

91,000

Overisel Township

Hamilton & Bentheim Elementary

wireless data communications

6/1/2009

8/1/2009

$

124,000

Overisel Township

Hamilton & Sandyview Elementary

additional classrooms for kindergarten (state forcing extended day programming)

8/1/2009

2/1/2010

$

297,000

Overisel Township

Hamilton & Bentheim Elementary

additional classrooms for kindergarten (state forcing extended day programming)

2/1/2010

$

891,000

Ovid Township

Coldwater Lakeland Elementary

30 days after start

$

9,600

60 days after start

$

12,000

60 days after start

$

14,400

60 days after start

$

18,000

60 days after start

$

22,000

90 days after start

$

32,760

90 days after start 120 days after start

$

37,800

$

72,000

Oscoda Area Schools Oscoda

Oscoda Area Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Hamilton Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools Coldwater Community Schools

8/1/2009

Funding Request

m b u

Ovid Township Ovid Township

S

Ovid Township Ovid Township

Coldwater Lakeland Elementary Coldwater Lakeland Elementary Coldwater Lakeland Elementary Coldwater Lakeland Elementary

Ovid Township

Coldwater Lakeland Elementary

Ovid Township

Coldwater Lakeland Elementary

Ovid Township

Coldwater Lakeland Elementary

02262009

-N

e u

eq

R d

e t t

it

s t s

T O

O R

7/12/2009

8/1/2009 Within 90 days Recommission hot water, heating and ventilation systems from approval Within 90 days Replace heating hot water pump number 1 from approval Within 90 days Replace original exterior doors from approval Within 90 days Insulate boiler room hot water pipes and replace wall mounted thermostats from approval Within 90 days Provide heating hot water non-chemical filtration system from approval Within 90 days Replace 21 sinks and plumbing with energy efficient faucets from approval Within 90 days Replace 21 water closets with energy efficient closets from approval Replace 250 lighting fixtures with electronic ballasts and energy efficient T8 lamps andWithin 90 days reflectors from approval

Submitted Requests - Not Approved

8/15/2009

Route (Infrastructure Only)

558 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Coldwater Community Schools Ovid Township Coldwater Community Schools Ovid Township Coldwater Community Schools Ovid Township

Owosso Public Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools

Oxford Area Community Schools

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

Western School District

Project Name

Project Description

Coldwater Lakeland Elementary

Masonry repairs

Coldwater Lakeland Elementary

Provide Variable frequency Drive and controller for boiler heating hot water pumps

Coldwater Lakeland Elementary

Replace roof

Start Date Within 90 days after approval Within 90 days from approval Within 90 days after approval

Expected Completion Date

Funding Request

60 days after start

$

78,000

90 days after start

$

84,000

60 days after start

$

260,400

5,000,000

D VE

Owosso

Owosso

Heating and Ventilation to increase energy efficiency

1st project - June 1st project August 09, residual 09, residual October 09 $ August

Owosso

Owosso

Integration of alternative energy sources - solar/wind/geothermal

9/9/2009

Owosso

Owosso

Windows - Remaining at Middle School and High School

7/9/2009

Owosso

Owosso

Technology upgrades-computers, switches, etc…

Owosso

Owosso

Updating for ADA standards

Owosso

Owosso

Fire Alarm Upgrades

Oxford Area Community Schools

erecting, furnishing and equipping additions to and remodeling, furnishing and refurnishing, equipping and re-equipping school buildings; acquiring, installing and equipping school buildings for technology; purchasing school buses; constructing, equipping, developing and improving athletic and physical education facilities, play fields and playgrounds; and acquiring, developing and improving sites.

West Ottawa Public Schools - Lakeshore Elementary

This project seeks to repaint the interior walls, trim and metal ceilings at Lakeshore Elementary. The building has not been painted since being constructed in 1993. The paint is showing its age with wear marks and dirt. The project is on the district's future June 2009 or capital project list for consideration. June 2010

This project seeks to replace the carpet at Lakeshore Elementary installed in 1993 when the building was constructed. The carpet is worn and is difficult to keep clean and odor free. The project is on the district's capital project list for consideration pending future funding.

Oxford

Park Township

S

Parma

02262009

$

1,000,000

10/9/2009

$

1,600,000

9/9/2009

12/9/2009

$

120,000

8/9/2009

10/9/2009

$

500,000

8/9/2009

10/9/2009

$

1,000,000

$

70,135,000

September 2009 or September 2010

$

75,000

June 2009 or June 2010

September 2009 or September 2010

$

170,000

West Ottawa Public Schools - Lakewood Elementary

The project seeks to reconfigure the traffic flow and expand parking at Lakewood Elementary. The district's current standard is to have a separate bus drop off zone, parent pick-up/drop-off zone and general parking areas thereby creating a safe environment for students, parents and the community. The current configuration for this building provides the desired "zones" but capacity significantly limits safe and June 2009 or efficient traffic flow. June 2010

September 2009 or September 2010

$

200,000

West Ottawa Public Schools - Waukazoo Elementary

The project seeks to reconfigure the traffic flow and expand parking at Waukazoo Elementary. The district's current standard is to have a separate bus drop off zone, parent pick-up/drop-off zone and general parking areas thereby creating a safe environment for students, parents and the community. The current configuration for this building does not provide the desired "zones" and current capacity is significantly June 2009 or limiting. June 2010

September 2009 or September 2010

$

250,000

8/31/2009

$

84,500

d e tt

it

m b u

Park Township

Park Township

PP

12/9/2009

West Ottawa Public Schools - Lakeshore Elementary

Park Township

O R

e u

st

q e R

s

A T

O N

Building insulation, high school and administration building vestibules, door framework replacements, solar powered roof venting to save energy in various areas of the district, replace energy draining windows in Middle School, energy efficient 6/15/2009* Western School District-Energy Conservation thermostats.

Submitted Requests - Not Approved

Route (Infrastructure Only)

559 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Western School District

Parma

Western School District-All 6 district schools

Upgrade the district wide food service software system to operate in conjunction with the student data system and allow parent to view their student accounts. The current software has little to no support and needs replacing before the product is not operational. 6/15/2009*

Western School District

Parma

Western School District-All 6 district schools

Upgrade asphalt parking lots and repair pot holes, dips and cracks to maintain the integrity of the parking lots.

6/15/09 * Weather permitting 8/31/2009

Western School District-All 6 district schools

Update the network backbone to 10GB between the district buildings and to 1GB in the classrooms to accommodate the phone system upgrade and to handle the ever increasing demand by teachers and classroom instruction on the network. This will support the

6/15/2009*

Western School District Western School District Western School District Western School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Parma

8/31/2009

O R 8/31/2009

Funding Request

$

32,692

$

75,000

$

175,000

$

229,472

D VE

Parma

Western School District-Western Middle & High School

Parma

Western School District-All 6 district schools

Roof Repairs at the Middle School and High School building located in Spring Arbor Township. This will maintain the integrity of the roofs in the district that are not currently under a warranty. Upgrade the current district wide phone system to improve the communication operations of the district.

6/15/2009*

8/31/2009

$

250,000

Western School District-All 6 district schools

Replacement computers in classrooms to provide students with the necessary tools for online learning and teaching programs. This will provide assurance to continue to follow the district technology plan. 6/15/2009*

8/31/2009

$

277,500

depending on weather, within 90 within 3 months of days of funding start $

40,000

depending on weather, within 90 within 3 months of days of funding start $

50,000

depending on weather, within 120 days of funding

within 3 months of start $

40,000

depending on weather, within 120 days of funding

within 3 months of start $

50,000

depending on weather, within 120 days of funding

within 3 months of start $

100,000

Paw Paw Public Schools- Cedar Street

depending on weather, within Replace boiler in building due to age and to also increase the energy efficiency of the 120 days of building funding

within 3 months of start $

150,000

Paw Paw Township

Paw Paw Public Schools- Early Elementary

Build 2 additional classrooms on the Early Elementary to allow us to provide all day kindergarten instruction versus half day. We need additional space to do this to reduce the class sizes to educationally appropriate levels. The rooms would be consistent with the provisions of a "green" building.

within 9 months of start $

615,000

Paw Paw Township

depending on Upgrade fencing on perimeter of the property to better protect the students while they weather, within 90 within 3 months of Paw Paw Public Schools- Elementary Campus are outside the buildings. days of funding start $

15,000

Parma

A T

s

O N

Paw Paw Township

Paw Paw Public Schools-Bus garage

Replace the metal roof with a more energy efficient roof.

Paw Paw Township

Paw Paw Public Schools-Central Administration

Insulate ceilings and retrofit the windows to improve the energy efficiency of the building.

Paw Paw Township

Paw Paw Township

Paw Paw Township

Paw Paw Public Schools- Cedar Street

02262009

q e R

Insulate above the ceiling to improve energy efficiency of the building

Paw Paw Public Schools-Michigan Academy Upgrade windows in building to make more energy efficient

d e tt

t i m

Paw Paw Public Schools-Michigan Academy Replace roof with a more energy efficient roof

b u S

Paw Paw Township

e u

st

Submitted Requests - Not Approved

PP

4/1/2009 Weather permitting 8/31/2009

depending on weather, within 120 days of funding

Route (Infrastructure Only)

560 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District Tri County Area Schools Public Schools Of Petoskey Public Schools Of Petoskey Public Schools Of Petoskey Public Schools Of Petoskey

Public Schools Of Petoskey

Public Schools Of Petoskey Public Schools Of Petoskey Public Schools Of Petoskey

Paw Paw Township

Paw Paw Township

Paw Paw Township

Project Name

Project Description

Start Date

Build a pole barn structure at the elementary campus for storage of maintenance, Paw Paw Public Schools- Elementary Campus grounds and other equipment. Roof repairs to flashings, etc. to address leaking issues. We have had some mold growth in the building that appears to be related to moisture in the ceilings from roof leaks

Paw Paw Public Schools-Middle School

Repair to structure including: outside steps, roof, boiler re-piping to improve heat delivery, security doors, rework chimney. Steps, security doors and chimney are Paw Paw Public Schools-Michigan Academy safety issues

within 3 months of start $

30,000

depending on weather, within 120 days of funding

within 3 months of start $

40,000

O R

within 6 months of start $

60,000

depending on weather, within 120 days of funding

within 3 months of start $

60,000

P P A

Petoskey

Tri County Area Schools-Middle School Public Schools of Petoskey / Ottawa Elementary Public Schools of Petoskey / Petoskey High School

Pipe from local landfill to capture methane gas from landfill for use of heating fuel in the Middle School. This will be a valuable usage of a renewable resource that is currently burned off of at the site of the land fill. 2009 Fall Replace 8,500 square feet of existing rubber membrane roofing. Add insulation prior to new roof installation for added energy efficiency. 6/1/2009 Replace 19,000 square feet of existing rubber membrane roofing. Add insulation prior to new roof installation for added energy efficiency. 6/1/2009

Petoskey

Public Schools of Petoskey / Ottawa Elementary

Replace windows circa 1955 with new, energy efficient windows at Ottawa Elementary to achieve energy savings and increase occupant comfort.

Petoskey

Public Schools of Petoskey / Petoskey High School

Petoskey

Public Schools of Petoskey / Petoskey High School

Petoskey

it

Petoskey

u S

bm

2010

$

700,000

12/1/2009

$

80,000

12/1/2009

$

175,000

6/1/2009

12/1/2009

$

245,000

Replace and upgrade air handling unit in G-wing and F-wing of High School. Current units are circa-1967 and in bad shape. Replace ductwork to handle proper air exchanges to meet IAQ standards. 6/1/2009

12/1/2009

$

290,000

Renovate and upgrade four existing bathrooms circa 1967. Replace existing fixtures with new, energy and water efficient fixtures. Upgrade lighting and lighting controls fo efficiency and comfort. Replace piping and sanitation lines back to mains. 6/1/2009

12/1/2009

$

600,000

Lighting and mechanical upgrades to all school buildings in District to achieve energy reduction of approximately 25%. Upgrades include replacing T12 lights with T8 lights; installing Variable Frequency Drives, installing carbon dioxide ventilation control, occupancy sensor light control, etc. Replace metal halide gym lights with high-bay florescent lights. Tie school mechanical systems together into one Building Management Software system. Place exterior lighting on building management controls. 6/1/2009

12/1/2009

$

2,100,000

Public Schools of Petoskey / Petoskey High School Public Schools of Petoskey / Spitler Administration Building

6/1/2010

$

750,000

6/1/2010

$

500,000

s t s

-N

e u

q e R

Public Schools of Petoskey / All Locations

Petoskey Petoskey

d e tt

T O

Repair, widen, and curb main campus access drive, for better traffic flow and increased safety. Drive is approximately 1 mile long and serves as the main traffic artery to three ouf our schools. 7/9/2009 Lighting, windows, doors, insulation, and mechanical upgrades to the existing 12,000 square foot building for energy efficiency. 8/1/2009

Public Schools Of Petoskey

Petoskey

Replace and upgrade boilers, unit ventilators, and HVAC systems throughout the building. Replace existing pneumatic controls with digital controls throughout the Public Schools of Petoskey / Petoskey Middle school. Tie controls into upgraded District Building Management Software system. School Use software to maximize building efficiency without sacrificing student comfort.

Public Schools Of Petoskey

Petoskey

Public Schools of Petoskey / Petoskey Middle Replace existing shingle roofs (approximately 100,000 square feet) with metal roof School system. Replace and upgrade existing insulation to achieve energy savings.

02262009

D VE

depending on weather, within 120 days of funding

To eliminate the ice that hangs off the building and which poses a safety risk to the students and visitors, add heat tape to the roof edges

Peirson

Funding Request

depending on weather, within 120 days of funding

Paw Paw Public Schools - Later Elementary

Paw Paw Township

Expected Completion Date

Submitted Requests - Not Approved

8/1/2009

6/1/2010

$

1,100,000

8/1/2009

6/1/2010

$

1,250,000

Route (Infrastructure Only)

561 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Public Schools Of Petoskey Public Schools Of Petoskey

Public Schools Of Petoskey Public Schools Of Petoskey Concord Academy Petoskey

Project Name

Project Description

Start Date

Petoskey

Renovation and expansion of the existing auditoium. Current auditorium has 550 seats with basic amenities. Renovation would add additional seating, upgrade HVAC, lighting, sound, and stage systems. Also added would be screen rooms, storage, Public Schools of Petoskey / Petoskey Middle bathrooms, and backstage costume change rooms, which are not currently found at School this location. 9/1/2009 Public Schools of Petoskey / Petoskey Middle School Replace 61,000 square feet of existing carpeting, circa-1990. 6/1/2009

Petoskey

Public Schools of Petoskey / All buildings

Exterior and interior door replacement and upgrades to address security and maintenance issues. Repair or replace door frames as needed. Install a card-reader door access system at each school to significantly improve building access and security. 6/1/2009

Petoskey

Public Schools of Petoskey / Petoskey High School and Petoskey Middle School

Install camera survellience system at both campuses. System would provide security and survellence both inside the school and also for the parking areas. 8/1/2009

Petoskey

Concord Academy

Construct addition and improvements to current school facility

Petoskey

Expected Completion Date

A T

12/1/2011

6/1/2009

D VE $

5,500,000

$

145,000

$

500,000

6/1/2010

$

500,000

9/1/2009

$

1,500,000

12/1/2011

$

4,321,000

8/1/2009

O R

PP

Funding Request

12/1/2009

Public Schools Of Petoskey

Petoskey

Public Schools of Petoskey / All buildings

Replace and upgrade existing computers, computer labs, servers, printers, and related equipment. Existing equipment is circa-1998 from last bond issue. Upgrade software from Windows 2000 and Microsoft Office 2000 to latest versions of both. Complete installation of fiber underground to all locations. Upgrade telephone stations and software to current versions. 9/1/2009

Pewamo-Westphalia Community Schools

Pewamo

Pewamo-Westphalia Elementary

Installation of energy efficient lighting throughout the building.

6/15/2009

8/15/2009

$

75,000

Pewamo-Westphalia Elementary

Building addition to accommodate expansion of DK and Kindergarten programs from half-day to all-day every day. This would establish three new full time teaching positions. 3/15/2010

9/15/2010

$

500,000

6/1/2009 6/1/2009

8/15/2011 8/9/2009

$ $

68,710,000 50,000

6/1/2009 6/1/2009

8/9/2009 8/9/2009

$ $

50,000 75,000

6/1/2009

8/9/2009

$

200,000

6/1/2009 6/1/2009

8/9/2009 8/9/2009

$ $

200,000 225,000

6/1/2009

8/1/2009

$

250,000

6/1/2009

8/9/2009

$

350,000

Pewamo-Westphalia Community Schools

Pewamo

st

s

e u

O N

Hale Area Schools-all

Erecting, furnishing and equipping additions to, and remodleing, furnishing and refurnishing, equipping and re-equipping the schools; acquiring, installing and equipping technology for the schools; and developing and improving sites Computer Labs - update wiring, casing relocation School Safety - install security cameras and key cards at all school buildings; entrances, hallways Shop Area - remove/replace old building Restroom upgrades - update to low flow sensor faucets, install air-hand dryers to improve a greener environment Science Labs - renovate and update labs with products/materials more green including flooring, tiles Bleachers - replace condemned bleachers Replace 39-year old boilers in high school building; replace piping, univents, ventilators Roof Replacement - deterioriating shingles, improve ventilation, improve insulation to reduce energy costs

Plainfield Township

Northview Highlands Middle

Remove/Upgrade - Energy conservation lighting and Drop Ceiling

6/1/2009

7/1/2009

$

50,000

Plainfield Township

Northview West Oakview Elementary

6/1/2009

8/1/2009

$

160,000

Plainfield Township

Northview West Oakview Elementary

Roof replacement to increase R value with thermal insulation. Early Childhood Center with 6 new classrooms, improved parking and bus routes, improved water flow for fire suppressant system.

7/1/2009

9/1/2009

$

1,450,000

Plainfield Township

Northview East Oakview Elementary

Remove/ Replace Building Carpet

6/1/2009

7/1/2009

$

135,000

Pinckney Community Schools Hale Area Schools

Pinckney Plainfield Township

Pinckney Community Schools Hale Area Schools-HS

Hale Area Schools Hale Area Schools

Plainfield Township Plainfield Township

Hale Area School all Hale Area Schools-HS

Hale Area Schools

Plainfield Township

Hale Area Schools all

Hale Area Schools Hale Area Schools

Plainfield Township Plainfield Township

Hale Area Schools-HS Hale Area Schools-HS

Hale Area Schools

Plainfield Township

Hale Area Schools

Hale Area Schools Northview Public School District Northview Public School District Northview Public School District Northview Public School District

Plainfield Township

tt i m

d e t

ub

S

02262009

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

562 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Plymouth-Canton Community Schools

Plymouth-Canton Community Schools

Plymouth-Canton Community Schools

Project Name

Project Description

Start Date

Plymouth-Canton Community Schools

Erecting, equipping, and furnishing a new middle school building and acquiring, prepairing, developing and improving the site for a new middle school buildin; erecting equipping and furnishing additions to school buildings and preparing, and improving sites for additions to school buildings; remodeling, re-equipping, re-furnishing schoool buildings and other facilities, preparing, developing and improving sites at school buildings and other facilities, and purchasing school buses; and equipping and reequipping school buildings for technology systems and equipment? 6/1/2009

Plymouth Canton - Remodel Central Middle School

Remodel Central Middle School / existing school is over 60 years old and has outlived its useful life / it will be used for District wide Staff development - Community Services - Child Care / new building will include innovative program supported with seamless technology / designed to gain LEED Certification 9/1/2009

PCCS - Remodel Central Middle School

Remodel Central Middle School / existing school is over 60 years old and has outlived its useful life / it will be used for District wide Staff development - Community Services - Child Care / new building will include innovative program supported with seamless technology / designed to gain LEED Certification 9/1/2009

Pontiac

Pontiac Ciy School District

Erecting, furnishing and equipping a new middle school and two elementary school buildings; erecting, furnishing and equipping additions to and remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; acquiring land for site purposes and developing and improving playgrounds, playfields, athletic fields and sites? The estimated millage that will be levied for the proposed bonds in 2005, under current law, is 1.42 mills ($1.42 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 1.03 mills ($1.03 on each $1,000 of taxable valuation). 6/1/2009

Pontiac

Pontiac-ROGERS

Pontiac

Pontiac-ALCOTT

Pontiac

Pontiac-FROST

Pontiac

Pontiac-WHITMAN

Pontiac

Pontiac-JEFFERSON

Plymouth

Plymouth

Plymouth

Expected Completion Date

T O

8/15/2012

D VE $

62,100,000

12/1/2010

$

14,500,000

12/1/2010

$

14,500,000

8/15/2012

$

99,900,000

O R

P P A

Funding Request

Route (Infrastructure Only)

N s

Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Port Hope Community Schools

Pontiac Port Hope

Port Hope Community Schools Port Hope

02262009

S

e R

7/9/2009

12/9/2009

$

300,000

Replace Roof

7/9/2009

12/9/2009

$

400,000

Replace Roof

7/9/2009

12/9/2009

$

400,000

Replace Roof

7/9/2009

12/9/2009

$

450,000

Replace Roof

7/9/2009

12/9/2009

$

800,000

Pontiac-KENNEDY

Replace Roof

7/9/2009

12/9/2009

$

900,000

Pontiac-MADISON

Replace Roof

7/9/2009

12/9/2009

$

900,000

Pontiac-ROGERS

6/9/2009

12/10/2009

$

6,000,000

Port Hope Community

Building a new wing WINDOW REPLACEMENT replace existing windows with much more energy efficient windows.

6/10/2009

Sept. 2009

$

56,000

Port Hope Community

Insulate 14,000 sq ft. of ceiling along with replacing existing roof with EDPM. Can not insulate our ceiling untill we resurface our roof, too many leaks. July 5 2009

Sept 2009

$

130,000

m b u

Pontiac

qu

Replace Roof

itt

Pontiac

t s e

d e t

Submitted Requests - Not Approved

563 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Description

Start Date

Port Hope Community

Resurface existing parking lot. Pulverize the existing asphalt and replace with two layers of 1.5"of asphalt. The Port Hope School Board for the last 4 months has been discussing whether to ask the voters for a sinking fund millage for this project, but because of the economy decided not to. July 5 2009

Kalamazoo Regional Educational Service Agency

Project description: 13,516 sq. ft. addition to the Educational Service Center in Kalamazoo County. Intense renovation and retooling of 6,690 sq. ft. of existing space, average renovation of 15,315 sq. ft. of existing space, minimal renovation of 15,308 sq. ft. of existing space, exterior renovation of 650 lf of existing facility, additional parking and minor site work. This will include energy efficiency through new mechanical and electrical systems. The project will utilize Green design and construction initiatives based on USGBC LEED concepts. Purpose of Project: Increase and Improve capacity to serve local school districts in the areas of teacher training, leadership development, special education, and vocational-technical education. Obtain needed capacity to effectively implement the expansion of consolidation of non-instructional services such as technology services, business services, transportation coordination, human resources and other services. This would be accomplished with the addition of a training center and re-tooling mechanicals to improve efficiency and gain additional capacity through a complete res9/1/2009

Portland Public Schools

Construct and Equip 5 Kindergarten Classrooms. State legislative intent language calls for full-time kindergarten in two years. We will have to build five new classrooms to comply wih this unfunded mandate. 7/1/2009

Powell Township

Powell Twp. School Technology Project

Putnam Twp

Port Hope Community Schools Port Hope

Kalamazoo R.E.S.A.

Project Name

Expected Completion Date

$

51,000

11/1/2010

$

7,824,000

9/1/2011

$

1,150,000

This proposal seeks to improve student achievement and integrate the use of technology into all teaching and learning. The project will provide 2 mobile energy efficient computer stations containing 15 laptops each and a wireless printer for student and teacher use. Online access, scanners, cameras and sustained professional development activities will support daily classroom use and integration into all subject areas. Students will become competent in the use of varied technologies and be able to use these skills in high school. The computer teacher will team teach in the classroom in every content area to assist and support teachers and students in applied uses of technology. The project will be implemented and monitored by the school’s technology team. Access to the internet will be provided for students wishing to enroll in virtual classes at the high school and college level. June, 2009

September, 2009

$

40,000

Pinckney Community Schools - Pinckney Community High School

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

6/1/2010

$

2,289,670

Putnam Twp

Pinckney Community Schools - Farley Hill Elementary

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

6/1/2010

$

2,498,407

Putnam Twp

Pinckney Community Schools - Pinckney Elementary

Sitework, exterior architectural, interior architectural, accessibility, life safety, replacement of plumbing, mechanical and electrical systems. Most of the money is to be spent upgrading to energy efficient lighting, heating and cooling systems.

6/1/2009

6/1/2010

$

7,310,106

Quincy Community Schools Bond Issue (Defeated in May 2008) Quincy Community Schools Bond Issue (Defeated in May 2008)

erecting, furnishing and equipping a middle gymansium; acquiring, equipping and installing technology for the new gymnasium and existing facilities; partially remodeling and equipping existing school facilities, in part for security purposes; and acquiring, developing and improving sites. 7/1/09 Refurbish middle school/high school locker rooms, $800,000. Jennings Elementary School roofing, $150,000. 7/1/09

$

6,575,000

$

950,000

Portage

Portland Public School District Portland

T O

s t s

Sept. 2009

Funding Request

P P A

O R

-N

D VE

Route (Infrastructure Only)

e u

Powell Township Schools

Pinckney Community Schools

Pinckney Community Schools

Pinckney Community Schools

Quincy Community School District Quincy Community School District

tt i m

d e t

b u S

Quincy Quincy

02262009

q e R

Submitted Requests - Not Approved

564 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Quincy Community School District

New Haven Community Schools

New Haven Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Reading Community Schools Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Project Name

Project Description

Start Date

Quincy

Quincy Community Schools Bond Issue (Defeated in May 2008)

erecting, furnishing and equipping a district-wide auditorium; acquiring, equipping and installing technology for the new auditorium; and developing and improving the site.

Ray Twp

New Haven Schools-Installation of a temperature control system for the Siefert Elementary School building

Currently, there is no temperature control system at this building. Temperatures vary tremendously within the building. We have found that an overall computerized temperature control system, which we have in other buildings is advantageous. June, 2009

Ray Twp., Michigan Reading Reading Reading

Reading Reading Reading Reading Reading Reading Reading Reading Reading Reading

m b u

Redford Redford

Redford Redford Redford

Redford Union School District Redford

02262009

Reading Community Schools - Reynolds Elementary School Reading Community Schools - Owens High School Reading Community Schools - Reynolds Elementary School Reading Community Schools - Bus Maintenace Facility Reading Community Schools - Bus Maintenace Facility Reading Community Schools - Owens High School Reading Community Schools - Reynolds Elementary School Reading Community Schools - Owens High School Reading Community Schools - Owens High School Reading Community Schools - Reynolds Elementary School Redford Union School District #1/ Beck Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School

S

Redford Union School District #1 / Keeler Elementary

7/1/09

$

250,000

August, 2010

$

1,320,000

8/15/2009

$

20,000

6/15/2009

9/15/2009

$

187,467

O R

6/15/2009

6/15/2009

9/15/2009

$

309,341

Replace 50 year old heating pipes through out entire elementary school. The current pipes are very old and rusting and starting to leak. The project would also include pipe insulation which would greatly improve efficiency. 6/15/2009 Replace boiler and heating pipes at high schools. A new boiler and new insulated piping would greatly improve efficiency. 6/15/2009

8/15/2009

$

535,620

9/15/2009

$

720,210

Replace roof on 6th grade building

6/15/2009

8/15/2009

$

20,000

6/15/2009

8/15/2009

$

32,000

Reconfigure parking facility and replace asphalt at bus mantenance facilty.

6/15/2009

8/15/2009

$

50,000

Replace student lockers throughout building.

6/15/2009

8/15/2009

$

141,000

Asphalt replacement at Elementary

6/15/2009

8/15/2009

$

170,000

Renovate high school locker rooms.

6/15/2009

9/15/2009

$

170,000

Replace bleachers in gymnasium.

6/15/2009

8/15/2009

$

200,000

Replace running track. Provide adequate water shed at perimeters of building backfill to conceal exposed foundation (see Site). Provide DX-cooling with administrative rooftop unit. See Heating and Ventilation for cost.

6/1/2009

7/15/2009

$

220,000

5/4/2009

8/2/2009

6/15/2009

9/13/2009

T O

s t s

Replace roof on bus maintenance facility.

-N

e u

eq

Provide new low maintenance landscaping. 5/4/2009 Provide repairs to the soffits including prep and painting of exposed steel components 5/4/2009 (included with roof system).

8/2/2009

Recaulk all control joints in brick walls and replace missing bricks.

8/2/2009

5/4/2009

Refer to Heating and Ventilating for new packaged unit for the Administration Area. 6/15/2009 Repair spalled and cracked concrete at the top of the foundation wall. Raise grade to protect future exposure. (See site section) 5/4/2009 Replace older T12 lamp magnetic ballasted fluorescent fixtures in gymnasium with new energy efficient T8 or T5HO lamp electronic ballasted high bay fixtures.

Submitted Requests - Not Approved

3/30/2009

Route (Infrastructure Only)

4,990,000

D VE

August, 2010

P P A

Replace lighting in gymnasium to increase efficiency and brightness. Replace heating controls throughout elementary. Will improve efficiency in heating the building. Replace heating controls throughout high school. Will improve efficiency in heating the building.

Funding Request

$

Currently, we have air conditioned the front of the building. We would like to complete air conditioning of the remainder of the building. Particularly when dealing with elementary students, the comfort of the building and the environs contributes greatly to the educational environment. June, 2009

R d

e t t

it

Redford

Redford

New Haven Schools-Installation of air conditioning units in the remainder of the Siefert Elementary School Reading Community Schools - Owens High School Reading Community Schools - Reynolds Elementary School Reading Community Schools - Owens High School

Expected Completion Date

8/2/2009

9/13/2009 8/2/2009

6/28/2009

565 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Location City or Township Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford

m b u

Redford Redford

Redford Redford

Redford Union School District Redford

02262009

S

Project Description

Start Date

Redford Union School District #1/ Beck Elementary

Funding Request

Reflash chimney stack.

5/4/2009

8/2/2009

$

2,400

Install smaller grating over existing openings to deter birds.

5/4/2009

8/2/2009

$

2,600

Replace metal grate above the Pool sublevel.

5/4/2009

8/2/2009

$

2,900

Add trouble lights in Auto Shop.

3/30/2009

6/28/2009

$

3,200

Provide power for air conditioning in computer lab.

3/30/2009

$

3,200

Replace exterior mechanical grilles and seal perimeters where necessary.

5/4/2009

$

3,900

Service all TVSS panels and replace components that have failed.

PP

8/2/2009

3/30/2009

6/28/2009

$

4,000

3/30/2009

6/28/2009

$

4,000

3/30/2009

6/28/2009

$

4,000

3/30/2009

6/28/2009

$

4,000

Service all TVSS panels and replace components that have failed.

3/30/2009

6/28/2009

$

4,000

Service all TVSS panels and replace components that have failed.

3/30/2009

6/28/2009

$

4,000

3/30/2009

6/28/2009

$

4,000

Tuckpoint loose sill blocks at the kitchen windows. Verify existing fluorescent emergency ballasts are operational and replace defective units.

6/15/2009

9/13/2009

$

4,000

3/30/2009

6/28/2009

$

4,200

Replace building mounted lighting fixtures with newer more efficient fixtures. Verify existing fluorescent emergency ballasts are operational and replace defective units.

3/30/2009

6/28/2009

$

4,400

3/30/2009

6/28/2009

$

4,400

Replace building mounted lighting fixtures with newer more efficient fixtures. Verify existing fluorescent emergency ballasts are operational and replace defective units. Verify existing fluorescent emergency ballasts are operational and replace defective units.

3/30/2009

6/28/2009

$

4,500

3/30/2009

6/28/2009

$

4,600

3/30/2009

6/28/2009

$

4,600

Regrade perimeter of building.

5/4/2009

8/2/2009

$

4,800

Replace Toilet Room plumbing fixtures. 6/15/2009 Provide a new exhaust fan for the exhaust hood in room 152 (includes removal of old fan, new fan, reconnect to existing ductwork). 6/15/2009

9/13/2009

$

4,800

9/13/2009

$

5,000

Replace exterior mechanical grilles where necessary.

5/4/2009

8/2/2009

$

5,500

Caulk perimeter of aggregate panels.

5/4/2009

8/2/2009

$

5,610

Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures in restrooms and kitchen.

3/30/2009

6/28/2009

$

5,800

A T

Service all TVSS panels and replace components that have failed. Service all TVSS panels and replace components that have failed.

O N

Service all TVSS panels and replace components that have failed.

s

st

Service all TVSS panels and replace components that have failed.

e u

eq

R d

e t t

it

Redford

Redford

Project Name Redford Union School District #1 / MacGowan Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Stuckey Elementary Redford Union School District #1/ Beck Elementary

Expected Completion Date

Submitted Requests - Not Approved

O R 6/28/2009

D VE

Route (Infrastructure Only)

566 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Project Name

Project Description

Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Stuckey Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / MacGowan Elementary

Redford Redford Redford Redford Redford Redford Redford Redford

Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Redford Union High School

Redford Redford Redford Redford

Redford

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Pearson Education Center Redford Union School District #1/ Beck Elementary Redford Union School District #1/ Beck Elementary

Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford

Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Stuckey Elementary

Redford Redford Redford Redford

Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford

02262009

S

m b u

Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures in restrooms and kitchen.

3/30/2009

6/28/2009

Perform miscellaneous tuckpointing.

5/4/2009

8/2/2009

Replace building mounted lighting fixtures with newer more efficient fixtures.

3/30/2009

6/28/2009

Replace building mounted lighting fixtures with newer more efficient fixtures.

3/30/2009

6/28/2009

Replace building mounted lighting fixtures with newer more efficient fixtures.

3/30/2009

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Stuckey Elementary

Funding Request

$

D VE

6,000

$

6,000

$

6,000

$

6,100

6/28/2009

$

6,300

3/30/2009

6/28/2009

$

6,500

6/15/2009

9/13/2009

$

6,600

3/30/2009

6/28/2009

$

6,700

3/30/2009

6/28/2009

$

6,700

Provide masonry restoration at mechanical grilles.

5/4/2009

8/2/2009

$

6,800

Replace the refrigerator and freezer condensing units with air-cooled units.

6/15/2009

9/13/2009

$

6,800

Provide a new vehicle exhaust system for the Auto Shop (includes abandoning existing underground exhaust system, removal of existing exhaust fan, removal of existing aboveground ductwork, new overhead exhaust system, new fan, new ductwork, and controls).

6/15/2009

9/13/2009

$

7,300

Replace wood exit doors and frames with hollow metal doors and frames. Reroute the kitchen heating and ventilating unit outside air intake and provide more efficient filtration.

5/4/2009

8/2/2009

$

7,500

6/15/2009

9/13/2009

$

7,500

Repair damaged brick and mortar. Perform miscellaneous tuckpointing. Replace two old circuit breaker panels not replaced during renovations. Priority: Medium

5/4/2009

8/2/2009

$

7,800

3/30/2009

6/28/2009

$

7,800

6/15/2009

9/13/2009

$

7,800

3/30/2009

6/28/2009

$

8,000

3/30/2009

6/28/2009

$

8,000

Provide a general exhaust system for the auto shop complete with carbon monoxide detection and means for adequate makeup air (includes carbon monoxide detection sensor and panel, new exhaust fan, roof curb, ductwork, and control, interlock with existing v 6/15/2009

9/13/2009

$

8,300

3/30/2009

6/28/2009

$

8,700

5/4/2009

8/2/2009

$

8,800

Replace building mounted lighting fixtures with newer more efficient fixtures.

P P A

Service all TVSS panels and replace components that have failed. Provide a new exhaust hood for the kiln in the art room. (includes new hood, new exhaust fan, ductwork and controls).

T O

Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures in restrooms and kitchen. Verify existing fluorescent emergency ballasts are operational and replace defective units.

s t s

-N

e u

eq

The boiler and water heater venting system should be reworked to meet governing code requirements. The combustion air for the boiler and water heaters should also be analyzed and corrected to assure that it meets code requirements. Verify existing fluorescent emergency ballasts are operational and replace defective units. Verify existing fluorescent emergency ballasts are operational and replace defective units.

Replace building mounted lighting fixtures with newer more efficient fixtures. Replace deteriorating window sills. Perform brick replacement at the north façade and masonry restoration.

Submitted Requests - Not Approved

O R

3/30/2009

6/28/2009

Route (Infrastructure Only)

5,800

$

R d

e t t

it

Start Date

Expected Completion Date

567 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Location City or Township Redford Redford Redford Redford

Project Name Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Bulman Elementary

Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford

Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Redford Union High School

Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Union School District #1 / Hilbert Middle School Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Redford Union High School

Redford Redford Redford Redford Redford Redford Redford Redford

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Redford Union High School

Redford Redford Redford

02262009

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Stuckey Elementary

ub

Redford

Redford

e t tt

i m

Redford

Redford

Start Date

S

Funding Request

Regrade at Out Building and replace lower course of exterior masonry. 5/4/2009 Replace all lighting in Auto Shop areas with new energy efficient industrial fixtures with T8 lamps and electronic ballasts. 3/30/2009

8/2/2009

$

9,000

6/28/2009

$

9,100

Provide drain tile at the new playground area connected to storm sewer system. Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures.

5/4/2009

8/2/2009

$

9,200

3/30/2009

6/28/2009

$

9,300

$

9,500

8/2/2009

$

9,700

5/4/2009

8/2/2009

$

9,800

Replace all older T12 lamp magnetic ballasted fluorescent fixtures in restrooms and locker rooms with new energy efficient T8 lamp electronic ballasted fixtures.

3/30/2009

6/28/2009

$

9,800

Caulk perimeter of mechanical vents. Replace combustion grilles.

5/4/2009

8/2/2009

$

10,075

Replace damaged glass block windows. Secure deteriorating window sills and lintels. Perform brick replacement and miscellaneous tuckpointing at eleven (ll) areas. Replace broken sills.

5/4/2009

8/2/2009

$

10,200

5/4/2009

8/2/2009

$

10,270

Provide a dedicated split-system air conditioning unit for the data closet.

6/15/2009

9/13/2009

$

10,400

Replace damaged window units at the Kindergarten and First grade classrooms.

5/4/2009

8/2/2009

$

10,400

Replace the existing data closet air conditioning unit. Verify existing fluorescent emergency ballasts are operational and replace defective units.

6/15/2009

9/13/2009

$

10,400

3/30/2009

6/28/2009

$

11,200

9/13/2009

$

11,450

9/13/2009

$

11,700

Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures in restrooms, kitchen mechanical room, and food service warehouse area. 3/30/2009 Tuckpoint deteriorating window sills. Provide necessary brick replacement and miscellaneous tuckpointing. 5/4/2009 Repair and tuckpoint damaged window sills.

T O

s t s

e u

eq

Replace the Kitchen exhaust fans and provide adequate ventilation and makeup air (includes removal of old fan, new fan, and reconnect to existing ductwork). 6/15/2009 Remove and replace the exhaust fans for the gym. (includes removal of old fans, new fans, reconnect to existing ductwork). 6/15/2009 Provide new unit heaters and make-up air for the Wood Shop.

O R

P P A

-N

R d

Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Project Description

Expected Completion Date

6/28/2009

D VE

6/15/2009

9/13/2009

$

11,800

Provide a deluge system at the stage proscenium to meet the current codes (includes piping, valves, monitoring panel, air compressor, sprinkler heads, and connection to existing fire cross-main). 6/15/2009

9/13/2009

$

12,500

Tuckpoint areas where stop cracking has occurred.

5/4/2009

8/2/2009

$

12,600

Provide air conditioning for the computer lab.

6/15/2009

9/13/2009

$

13,000

Provide air conditioning to the computer lab. 6/15/2009 Provide air conditioning to the computer lab. Replace existing unit ventilators with unit ventilators with cooling capability. 6/15/2009

9/13/2009

$

13,000

9/13/2009

$

13,000

Replace outdated swing sets and regrade for proper drainage/ground cover.

5/4/2009

8/2/2009

$

14,300

Relocate kiln to a compliant space with proper ventilation.

6/15/2009

9/13/2009

$

15,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

568 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Location City or Township Redford Redford Redford Redford

Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford

itt

Redford

m b u

Redford Redford

Redford Union School Redford District

02262009

d e t

Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Pearson Education Center

Redford

Redford Union School District Redford

Project Description Provide a new air compressor in the Auto Shop with new distribution piping and appropriate compressed air outlets.

S

Start Date 6/15/2009

Funding Request

9/13/2009

$

16,250

8/2/2009

$

16,250

$

18,200

$

18,200

$

20,800

9/13/2009

$

20,800

Replace four original circuit breaker panels with new. 3/30/2009 Replace North gymnasium lighting fixtures with new energy efficient fluorescent high bay fixtures. 3/30/2009

6/28/2009

$

21,000

6/28/2009

$

21,000

Replace corridor borrowed light openings with compliant assemblies.

6/15/2009

9/13/2009

$

21,060

Regrade the areas which pitch toward the building to provide positive drainage.

5/4/2009

8/2/2009

$

23,580

Provide new low maintenance landscaping (allowance).

5/4/2009

8/2/2009

$

26,000

5/4/2009

8/2/2009

$

26,000

Provide new low maintenance landscaping.

5/4/2009

8/2/2009

$

26,000

Provide new low maintenance landscaping.

5/4/2009

8/2/2009

$

26,000

6/15/2009

9/13/2009

$

26,700

8/2/2009

$

27,300

8/2/2009

$

28,340

9/13/2009

$

28,800

8/2/2009

$

29,900

Reconstruct concrete stoops (five (5) locations). 5/4/2009 Reconfigure the hot water recirculating system (includes replacement of pumps, piping, and balancing valves. 6/15/2009 The heating hot water pumps should be replaced with pumps sized for the appropriate water flow and head loss. 6/15/2009

Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Keeler Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Stuckey Elementary

Redford

Redford Union School District Redford Redford Union School District Redford

Project Name Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School

Expected Completion Date

9/13/2009 9/13/2009

O R

Extend perimeter walls of storage rooms, mechanical, electrical and janitorial closets. Fire stops all mechanical and electrical penetrations within required rated walls. 6/15/2009 Replace the existing indoor dust collector.

s t s

Provide new low maintenance landscaping.

P P A 6/15/2009

T O

-N

e u

q e R

Replace the existing Metal Shop air handler.

Reconstruct foundation walls where openings have occurred. 5/4/2009 Regrade the area east of the facility for proper drainage. Provide drainage structure connected to the storm sewer system. 5/4/2009 Extend perimeter walls of storage rooms, mechanical, electrical and janitorial closets. Fire stops all mechanical and electrical penetrations within required rated walls. 6/15/2009 Provide tuckpointing and mansonry restoration at required areas. Introduce control joints where vertical cracks have appeared. 5/4/2009

9/13/2009

D VE

Provide new low maintenance landscaping.

5/4/2009

8/2/2009

$

30,000

Remove and replace the sump pumps.

6/15/2009

9/13/2009

$

30,000

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School

Replace the "wrestling pit" heating and ventilating system with a ventilation unit closer to the space that provides adequate heating, outside air, and exhaust. 6/15/2009

9/13/2009

$

30,000

Fire stop and all mechanical and electrical penetrations within required rated walls.

6/15/2009

9/13/2009

$

31,200

Redford Union School District #1 / Redford Union High School

Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures in Restrooms, Locker Rooms, Kitchen, Serving Rooms and Library.

3/30/2009

6/28/2009

$

31,200

Redford Union School District #1 / Hilbert Middle School

Replace the domestic water heater in the boiler room with a high efficiency condensing heater that is a sealed combustion system to provide proper combustion air. 6/15/2009

9/13/2009

$

32,500

Submitted Requests - Not Approved

Route (Infrastructure Only)

569 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford

Project Name Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Keeler Elementary

Redford Union School District Redford

Redford Union School District #1 / Pearson Education Center

Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Redford Union High School

Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford

Redford Union School District Redford Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Union School District #1 / Pearson Education Center

Redford

m b u

Redford Redford

Redford Redford Redford Redford

02262009

S

Start Date

Funding Request

Regrade the west side of the facility and hydro seed (allowance).

5/4/2009

8/2/2009

$

33,000

Provide a packaged rooftop unit for the Administration area.

6/15/2009

9/13/2009

$

34,000

Provide a rooftop unit for the Administration area.

6/15/2009

9/13/2009

$

34,000

Replace former Music Room horizontal unit ventilator and practice room air handler with a packaged rooftop unit for improved air distribution (exp. In areas with no ventilation) and to meet current minimum outside air requirements.

6/15/2009

$

35,750

Regrade north and west building perimeter and provide some retaining wall to allow grade to cover exposed foundation wall. Provide new landscaping.

5/4/2009

8/2/2009

$

37,200

Provide rooftop units for interior Offices.

6/15/2009

9/13/2009

$

39,000

6/15/2009

9/13/2009

$

40,000

6/15/2009

9/13/2009

$

40,000

6/15/2009

9/13/2009

$

40,300

6/15/2009

9/13/2009

$

40,300

6/15/2009

9/13/2009

$

40,300

3/30/2009

6/28/2009

$

41,600

Provide a packaged rooftop unit for the Administration area. 6/15/2009 Replace the existing unit ventilators in the Library with a rooftop heating and ventilatin unit. 6/15/2009

9/13/2009

$

42,250

9/13/2009

$

44,300

Replace former Chorus Room horizontal unit ventilator and practice room air handler with a packaged rooftop unit for improved air distribution (exp. In areas with no ventilation) and to meet current minimum outside air requirements. 6/15/2009

9/13/2009

$

45,500

Provide new exhaust fans for the Toilet Rooms sized to ensure adequate ventilation (includes removal of existing exhaust fans, new exhaust fans, reconnect to existing ductwork).

6/15/2009

9/13/2009

$

50,000

Replace exhaust fans and relief hoods. Convert the existing hot water distribution system to a variable flow system and replace necessary valves and piping.

6/15/2009

9/13/2009

$

50,000

6/15/2009

9/13/2009

$

52,000

Replace the Gym ventilation units with a single rooftop unit.

6/15/2009

9/13/2009

$

52,000

Replace the ventilation system for the Gym.

6/15/2009

9/13/2009

$

52,000

Replace the ventilation system for the Gym. Replace all older T12 lamp magnetic ballasted fluorescent fixtures with new energy efficient T8 lamp electronic ballasted fixtures. Remove and replace damaged heating terminal units throughout the Corridors, Vestibules, and Restrooms.

6/15/2009

9/13/2009

$

52,000

3/30/2009

6/28/2009

$

52,100

6/15/2009

9/13/2009

$

58,500

Provide a high efficiency condensing boiler for part-load applications.

6/15/2009

9/13/2009

$

60,000

T O

s t s

-N

e u

Submitted Requests - Not Approved

O R

P P A

Provide a packaged rooftop unit for the Administration area. Replace the damaged ventilation system for all Locker Rooms to provide adequate heating, outside air, and exhaust. Convert the existing hot water distribution system to a variable flow system and replace necessary valves and piping. Convert the existing hot water distribution system to a variable flow system and replace necessary valves and piping. Convert the existing hot water distribution system to a variable flow system and replace necessary valves and piping. Replace house lighting in Auditorium (change all lighting, remove existing lights and evaluate and design new system).

q e R

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / MacGowan Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1/ Beck Elementary

it

Redford

Redford

d e tt

Project Description

Expected Completion Date

9/13/2009

D VE

Route (Infrastructure Only)

570 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Location City or Township Redford Redford Redford Redford Redford Redford

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Pearson Education Center Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Bulman Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Stuckey Elementary

Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford

m b u

Redford Redford

Redford Redford Redford Redford

02262009

S

Project Description

Start Date

Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / MacGowan Elementary Redford Union School District #1/ Beck Elementary

Funding Request

Provide a high efficiency condensing boiler for part-load applications.

6/15/2009

9/13/2009

$

60,000

Provide a high efficiency condensing boiler for part-load applications.

6/15/2009

9/13/2009

$

60,000

Provide a high efficiency condensing boiler.

6/15/2009

9/13/2009

$

60,000

Provide a high-efficiency condensing boiler.

6/15/2009

9/13/2009

$

60,000

Provide two (2) dedicated rooftop units for the Main Office and Counseling Office. Remove the Weil McClain boiler and provide a high efficiency condensing boiler for part-load applications.

6/15/2009

$

60,000

9/13/2009

$

60,000

9/13/2009

$

64,600

9/13/2009

$

66,000

9/13/2009

$

67,000

9/13/2009

$

75,000

6/15/2009

T O

O R

P P A

Remodel the Locker Room showers. Replace the shower heads and valves with thermostatic mixing valves. Provide the required number of ADA compliant showers (includes removal of existing shower heads, valves and drains, new shower heads, valves and drains). 6/15/2009 Consolidate the building's existing domestic hot water system and provide a new high efficiency condensing water heater. 6/15/2009 Replace the existing Administration heating and ventilating unit with a packaged rooftop unit. 6/15/2009 Replace original truss-mounted units and exhaust fans for the Gymnasium with two (2 rooftop heating and ventilating units. 6/15/2009

-N

9/13/2009

D VE

Provide two (2) rooftop units for both Cafeterias.

6/15/2009

9/13/2009

$

78,000

Replace exterior doors which are deteriorating including sill replacement.

5/4/2009

8/2/2009

$

84,500

Remove and replace the ceiling mounted hallway cabinet unit heaters.

6/15/2009

9/13/2009

$

87,800

Remove and replace the air handler serving the Boy's and Girl's Locker Room.

6/15/2009

9/13/2009

$

91,000

Replace Toilet Room plumbing fixtures.

6/15/2009

9/13/2009

$

92,300

6/15/2009

9/13/2009

$

94,250

Replace deteriorating exterior doors and frames. 5/4/2009 Provide a fully integrated energy management system to achieve more consistent and efficient control of mechanical systems. 6/15/2009

8/2/2009

$

97,500

9/13/2009

$

104,000

Replace the existing steam boilers with high efficiency condensing hot water boilers. 6/15/2009 Provide a fully integrated energy management system to achieve more consistent and efficient control of mechanical systems. 6/15/2009 Provide a fully integrated energy management system to achieve more consistent and efficient control of mechanical systems. 6/15/2009

9/13/2009

$

104,000

9/13/2009

$

111,800

s t s

e u

eq

R d

e t t

it

Redford

Redford

Project Name Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Pearson Education Center

Expected Completion Date

Provide a packaged rooftop unit for the Administration Area.

9/13/2009

$

112,000

Remove and replace the air handlers serving both the large and small Gym. (includes removal of existing air handlers, new air handlers, reconnect ductwork, reconnect piping, and controls). 6/15/2009

9/13/2009

$

117,000

Upgrade restroom facilities. Repair tile joint cracks in the restroom walls.

6/15/2009

9/13/2009

$

121,500

Replace hollow metal exit doors and hardware (not replaced in recent bond). Provide a fully integrated energy managements system to achieve more consistent and efficient control of mechanical systems.

5/4/2009

8/2/2009

$

125,000

6/15/2009

9/13/2009

$

132,000

Provide DX-cooling for all replaced unit ventilators.

6/15/2009

9/13/2009

$

143,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

571 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford Redford Redford Redford Redford Redford Redford

Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Pearson Education Center Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School

Redford Redford Redford Redford Redford Redford Redford

tt i m

Redford Redford

ub

Redford Redford

Redford Redford Redford Redford

02262009

Project Description

Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Keeler Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Stuckey Elementary

Redford

Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Project Name

S

d e t

Start Date

Expected Completion Date

Provide a fully integrated energy management control system to achieve more consistent and efficient control of mechanical systems. This item includes retrofitting the existing boiler system with new controls. 6/15/2009 Replace the Auditorium ventilation system with a new rooftop unit to provide adequate outside air, distribution, and humidity control. 6/15/2009

9/13/2009

Replace Toilet Room plumbing fixtures.

6/15/2009

9/13/2009

Provide DX-cooling for all replaced unit ventilators.

6/15/2009

9/13/2009

Provide DX-cooling for all replaced unit ventilators.

6/15/2009

9/13/2009

Funding Request

$

D VE

145,000

$

156,000

$

156,000

$

175,500

$

175,500

9/13/2009

$

183,000

6/15/2009

9/13/2009

$

188,500

6/15/2009

9/13/2009

$

214,500

6/15/2009

9/13/2009

$

240,000

6/15/2009

9/13/2009

$

247,000

6/15/2009

9/13/2009

$

248,000

Replace Toilet Room plumbing fixtures throughout the building. 6/15/2009 Provide a fully integrated DDC energy management system to achieve more consistent and efficient control of mechanical systems. 6/15/2009 Provide a fully integrated energy management system to achieve more consistent and efficient control of mechanical systems. 6/15/2009

9/13/2009

$

258,440

9/13/2009

$

259,000

9/13/2009

$

270,400

Replace roof system including gutters and downspouts. 5/4/2009 Replace the existing pool ventilation system with a packaged rooftop dehumidification and ventilation system. 6/15/2009

8/2/2009

$

308,000

9/13/2009

$

325,000

Provide DX-cooling for all replaced unit ventilators. 6/15/2009 Replace roof system including perimeter coping/fascia, gutters, downspouts, flashing, blocking and insulation (if necessary). 5/4/2009

9/13/2009

$

357,500

8/2/2009

$

464,750

Provide DX-cooling for all replaced unit ventilators. 6/15/2009 Replace roof system including perimeter coping/fascia, gutters, downspouts, flashing, blocking and insulation (if necessary). 5/4/2009 Provide a fully integrated DDC energy management system to achieve more consistent and efficient control of mechanical systems. 6/15/2009

9/13/2009

$

487,500

8/2/2009

$

527,900

9/13/2009

$

528,000

6/15/2009

9/13/2009

$

533,000

5/4/2009

8/2/2009

$

550,800

5/4/2009

8/2/2009

$

553,000

5/4/2009

8/2/2009

$

598,500

Replace toilet room plumbing fixtures throughout the building. This item includes two-stage dx-cooling for all replaced unit ventilators. Provide DX-cooling for all replaced unit ventilators.

T O

Convert the Pool/Gymnasium/Band addition from steam heating to hot water. Consolidate the boiler plant to the Boiler Room across from the Weight Room.

P P A

-N

Provide DX-cooling for all replaced unit ventilators.

Remove the boilers serving the northeast portion of the building. Provide high efficiency condensing boilers at the Boiler Room across from the Weight Room and consolidate the heating system.

s t s

6/15/2009

e u

q e R

Replace all toilet room plumbing fixtures throughout the building. Provide lavatory Redford Union School District #1 / Redford pipe covers to comply with ADA (includes removal of existing plumbing fixtures, new Union High School plumbing fixtures, reconnect to existing piping). Redford Union School District #1 / Pearson Replace roof system including perimeter coping/fascia, gutters, downspouts, flashing, Education Center blocking and insulation. Redford Union School District #1 / MacGowan Replace roof system including perimeter coping/fascia, gutters, downspouts, flashing, Elementary blocking and insulation (if necessary). Redford Union School District #1 / Hilbert Replace roof system including perimeter coping/fascia, gutters, downspouts, flashing, Middle School blocking and insulation (if necessary).

Submitted Requests - Not Approved

O R 9/13/2009

Route (Infrastructure Only)

572 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Redford Union School District Redford

Project Name Redford Union School District #1 / Keeler Elementary

Redford Union School District Redford Redford Union School District Redford Redford Union School District Redford

Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Keeler Elementary

Perform masonry restoration. Replace all horizontal unit ventilators with vertical units that meet current minimum outside air requirements.

Redford Union School District Redford Redford Union School District Redford

Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / MacGowan Elementary

Replace existing horizontal unit ventilators with vertical-style units that are easier to maintain, provide the current minimum required amount of outside air, and distribute air more evenly throughout the classroom. Item includes the extension of new sys 6/15/2009 Replace all horizontal unit ventilators with vertical units that meet current minimum outside air requirements. 6/15/2009

Redford Union School District Redford Redford Union School District Redford

Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Redford Union High School

Replace existing horizontal unit ventilators with vertical-style units that are easier to maintain, provide the current minimum required amount of outside air, and distribute air more evenly throughout the classroom. Item includes the extension of new sys 6/15/2009 Replace roof system including perimeter flashings, coping, insulation, blocking and gutter systems. 5/4/2009

Redford Union School District Redford

Redford Union School District #1 / Hilbert Middle School

Replace existing horizontal unit ventilators with vertical-style units that are easier to maintain, provide the current minimum required amount of outside air, and distribute air more evenly throughout the classroom. Item includes the extension of new sys 6/15/2009

Redford Union School District Redford

Redford Union School District #1 / Pearson Education Center

Redford Union School District Redford

Redford Union School District #1 / Redford Union High School

Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District

Redford

tt i m

Redford Redford

ub

Redford Redford Redford Redford Redford Redford

02262009

S

d e t

Redford Union School District Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Pearson Education Center Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Redford Union High School Redford Union School District #1 / Hilbert Middle School Redford Union School District #1 / Redford Union High School

Expected Completion Date

Project Description Start Date Replace roof system including perimeter coping/fascia, gutters, downspouts, flashing, blocking and insulation (if necessary). 5/4/2009

8/2/2009

Replace existing horizontal unit ventilators with vertical-style units that are easier to maintain, provide the current minimum required amount of outside air, and distribute air more evenly throughout the classroom. Item includes the extension of new sys 6/15/2009

9/13/2009

Funding Request $

603,530

D VE $

743,600

$

854,970

$

912,600

9/13/2009

$

912,600

9/13/2009

$

980,000

9/13/2009

$

1,115,000

8/2/2009

$

1,189,380

9/13/2009

$

1,284,400

Replace existing horizontal unit ventilators with vertical-style units that are easier to maintain, provide the current minimum required amount of outside air, and distribute air more evenly throughout the classroom. Item includes the extension of new sys 6/15/2009

9/13/2009

$

1,859,000

Replace existing horizontal unit ventilators with vertical-style units that are easier to maintain, provide the current minimum required amount of outside air, and distribute air more evenly throughout the classroom. Item includes the extension of new sys 6/15/2009

9/13/2009

$

2,535,000

$

12,530,000

5/4/2009

e u

st

q e R

O R

6/15/2009

A T

s

8/2/2009

PP

O N

9/13/2009

partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities, in part, for energy conservation improvements; and developing and improving sites

Provide new soffit at building edge overhang (included with roof system).

5/4/2009

8/2/2009

Replace exterior hose bibbs. Re-pipe the existing grease trap for the Kitchen to meet current plumbing code requirements.

6/15/2009

9/13/2009

6/15/2009

9/13/2009

$

1,000

Repair/replace glazed block damage at walls and base including missing areas. Provide a chemical suppression system and gas solenoid shut-off for the Kitchen hood.

6/15/2009

9/13/2009

$

1,950

6/15/2009

9/13/2009

$

3,200

Provide new emergency lighting fixtures in Shop Areas and Library.

3/30/2009

6/28/2009

$

3,500

Add additional exterior wall hydrants. Add a floor sink in the incinerator room (includes new floor sink, excavation and backfill, cutting and patching of floor).

6/15/2009

9/13/2009

$

3,700

6/15/2009

9/13/2009

$

3,900

Submitted Requests - Not Approved

Route (Infrastructure Only)

573 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Redford Union School District Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools

Location City or Township Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Redford Reed City Reed City Reed City Reed City

Reed City

Reed City Reed City Richland Richland Richland

02262009

u S

Project Description

Start Date

Funding Request

Provide proper exit light signage.

6/15/2009

9/13/2009

$

3,900

Replace discolored window infill panels.

5/4/2009

8/2/2009

$

4,000

Replace exterior hose bibbs.

6/15/2009

9/13/2009

$

4,750

Provide shroud below display case and replace glass with tempered glass. 6/15/2009 Repair damage in Media Center caused by Roof leak. Replace tectum panels, beam enclosure, and miscellaneous brick/wall damage. 6/15/2009

9/13/2009

$

4,800

$

4,940

PP

9/13/2009

$

5,330

9/13/2009

$

6,000

3/30/2009

6/28/2009

$

8,500

6/15/2009

9/13/2009

$

12,000

Remove and replace the exterior hose bibbs. Reconnect to existing water piping.

6/15/2009

9/13/2009

$

13,000

Replace exterior hose bibbs.

6/15/2009

9/13/2009

$

13,000

6/15/2009

9/13/2009

$

26,300

6/15/2009

9/13/2009

$

38,000

6/15/2009

9/13/2009

$

59,000

Remove Corridor glass clerestory and infill with rated wall system. 6/15/2009 SAFETY: Update Fire Alarm System in K-2 Wing Interface with exiting system 6/8/2009 ENERGY SAVINGS: Central Office and Alternative Ed Roof Reed City Area Public Schools - Central Office Replacement 6/8/2009

9/13/2009

$

83,200

8/3/2009

$

22,000

8/1/2009

$

30,000

Reed City Area Public Schools - High School High School Dugouts at baseball field SAFETY: Sidewalk Replacement - Replace trip hazards Reed City Area Public Schools on sidewalks ENERGY SAVINGS: Central Office and Alternative Ed boiler Reed City Area Public Schools replacement: Replace 1948 boiler with energy efficient boiler

8/1/2009

10/30/2009

$

30,000

6/8/2009

8/31/2009

$

50,000

8/3/2009

8/17/2009

$

55,000

6/8/2009

8/31/2009

$

65,000

8/1/2009

8/21/2009

$

120,000

8/1/2009

8/21/2009

$

275,000

8/1/2009

8/21/2009

$

400,000

6/1/2009

9/1/2009

$

8,000

6/1/2009

9/1/2009

$

14,000

6/1/2009

9/1/2009

$

17,500

Provide fire suppression in storage area near receiving room.

6/15/2009

Replace exterior hose bibbs. Provide ambulatory accessible stalls in all Gang Toilet Rooms with six (6) or more plumbing fixtures. Provide a new exhaust fan and intake louvers for ventilation for the food service warehouse.

6/15/2009

A T

s

O N

Replace all glass in Corridor doors with tempered, rated glass.

st

Replace Classroom sinks with ADA and plumbing code compliant fixtures.

e u

Replace all Restroom and general exhaust fans throughout the building.

eq

R d

e t t

it

Reed City

Reed City

Project Name Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1 / Bulman Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / Pearson Education Center Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Stuckey Elementary Redford Union School District #1/ Beck Elementary Redford Union School District #1 / MacGowan Elementary Redford Union School District #1 / Pearson Education Center Redford Union School District #1/ Beck Elementary Reed City Area Public Schools - Norman Elementary

Expected Completion Date

ENERGY SAVINGS: Window and surrounding wall replacement Reed City Area Public Schools - Central Office Energy Efficient windows and wall repairs with added insulation around window Alt Ed openings ENERGY SAVINGS: High School Gym Roof Replacement: Add 6" Reed City Area Public Schools - High School of insulation and cover with Duro-Last membrane Reed City Area Public Schools- Norman ENERGY SAVINGS: Norman Elementary K-2 Wing roof replacement Elementary and additional insulation ENERGY SAVINGS: High School Roof Replacement: Add 6" of Reed City Area Public Schools - High School insulation and cover with Duro-Last membrane Gull Lake Community Schools - Richland Elementary New partitions in boys/girls restrooms for ADA compliance Gull Lake Community Schools Ryan Intermediate Refinish Gym Ceiling Gull Lake Community Schools - Richland Elementary Intercom system for emergency communication

bm

Submitted Requests - Not Approved

O R 9/13/2009

D VE

Route (Infrastructure Only)

574 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Gull Lake Community Schools Hemlock Public School District Hemlock Public School District Hemlock Public School District

Location City or Township

Richland

Project Name Project Description Gull Lake Community Schools - Richland Elementary New storage cabinets in classrooms to improve student learning environment Gull Lake Community Schools Ryan Intermediate Replace Bathroom Flooring for student safety Gull Lake Community Schools Ryan Intermediate Intercom system for emergency communication Gull Lake Community Schools Ryan Intermediate Replacement of classroom door locks for student & staff safety

Richland

Gull Lake Community Schools - Middle School Repair gym roof for safety

6/1/2009

Richland

Gull Lake Community Schools - Middle School Phys Ed locker replacement for student safety

6/1/2009

Richland

Gull Lake Community Schools - Middle School Intercom system for emergency communication Gull Lake Community Schools - Richland Replacement of doors and locks which includes 3 vestibules. Increase energy Elementary efficiency

PP

9/1/2009

6/1/2009

6/1/2009

9/1/2009

$

60,000

Gull Lake Community Schools - Middle School Renovate kitchen for student safety Gull Lake Community Schools - Richland Elementary Asphalt replacement - bus drive & parking lot Gull Lake Community Schools Ryan Intermediate Asphalt Replacement - Ryan Drive and Bus Circle Replacement of doors and locks which includes 3 vestibules. Increase energy Gull Lake Community Schools - Middle School efficiency

6/1/2009

9/1/2009

$

125,000

6/1/2009

9/1/2009

$

155,000

6/1/2009

9/1/2009

$

155,000

6/1/2009

9/1/2009

$

170,000

6/1/2009

9/1/2009

$

209,500

6/1/2009

9/1/2010

$

300,000

6/1/2009

9/1/2009

$

325,000

9/1/2009

$

400,000

9/1/2009

$

450,000

9/1/2009

$

720,000

Richland

Gull Lake Community Schools - Middle School Replace windows with energy efficient windows 6/1/2009 Gull Lake Community Schools High School Add air conditioning to gymnasium for improved air quality 6/1/2009 Gull Lake Community Schools Ryan Intermediate Replace Roof 6/1/2009 Replace air handling system, replace ceilings and lighting. Need to improve air quality 6/1/2009 Gull Lake Community Schools - Middle School for entire building. Increase energy efficiency

9/1/2010

$

1,500,000

Richland Township

Ling

Richland Richland Richland

Start Date

Expected Completion Date

6/1/2009

9/1/2009

$

24,000

6/1/2009

9/1/2009

$

25,000

6/1/2009

9/1/2009

$

30,000

6/1/2009

9/1/2009

$

32,250

$

40,000

$

44,000

9/1/2009

$

50,000

A T

Richland Richland Richland Richland Richland Richland

s

st

O N

Gull Lake Community Schools - Middle School Asphalt replacement the front, side & back lots Gull Lake Community Schools - Richland Elementary Rooftop airhandlers; ventilation for air quality and energy efficiency Gull Lake Community Schools - Richland Elementary Roof replacement

e u

Richland Richland

eq

Richland Richland Richland

it

m b u

Richland Township

Hemlock

Richland Township

Hemlock

R d

e t t

Funding Request

O R 9/1/2009

D VE

Lighting improvements to reduce energy consumption

6/1/2009

10/1/2009

$

30,000

HVAC improvements including boiler replacement

6/1/2009

10/1/2009

$

518,000

Building renovations to selected classrooms to allow

6/1/2009

10/1/2009

$

125,000

Route (Infrastructure Only)

S 02262009

Submitted Requests - Not Approved

575 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools

River Rouge School District

River Rouge School District

River Rouge School District

Project Name

Project Description

Start Date

Richmond

Richmond Community Schools

Erecting, furnishing and equipping a new high school and acquiring a site therefor; remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for school facilities and the new high school; constructing a maintenance/storage facility and a concession stand/storage/restroom facility; constructing, equipping, developing and improving outdoor physical education and athletic facilities, playfields, and playgrounds; and developing and improving sites? The estimated millage that will be levied for the proposed bonds in 2005, under current law, is 4.15 mills ($4.15 on each $1,000 of taxable valuation) for a net increase of 3.25 mills ($3.25 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive o any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 4.54 mills ($4.54 on each $1,000 of taxable valuation). 6/1/2009

Richmond

Richmond Community Schools

Middle School Interior Door/Wall Replacement

Richmond

Richmond Community Schools

Lee Elementary Carpet Replacement

Richmond

Richmond Community Schools

Lee Elementary Classroom Ventilation Replacement

Richmond

Richmond Community Schools

High School Classroom Ventilation Replacement

River Rouge-Walter White Early Childhood Center

River Rouge

55,425,000

8/1/2009

12/31/2009

$

125,000

10/1/2009

12/31/2009

$

180,000

10/1/2009

12/31/2009

$

450,000

7/1/2009

12/31/2009

$

650,000

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, Cooling and Boiler upgrades; New roof; New, energy-efficient windows, Update facilities and equipment to use modern, renewable energy; Upgrade/replace outdated electrical systems; Replace old lighting with energy efficient, "green" lighting; Computers and wireless technology in classrooms; reconfigure classrooms; repair damaged concrete/asphalt parking lots; update security systems; repair/replace outdated plumbing systems, Repair cracked/damaged walls and building foundations; Asbestos removal; replace flooring to include new carpeting and tile, painting and landscaping. 9/1/2009

9/1/2010

$

1,000,000

River Rouge-Sabbath Middle School

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, Cooling and Boiler upgrades; New roof; New, energy-efficient windows, Update facilities and equipment to use modern, renewable energy; Upgrade/replace outdated electrical systems; Replace old lighting with energy efficient, "green" lighting; Computers and wireless technology in classrooms; reconfigure classrooms; repair damaged concrete/asphalt parking lots; update security systems; repair/replace outdated plumbing systems, Repair cracked/damaged walls and building foundations; Asbestos removal; replace flooring to include new carpeting and tile, painting and landscaping. 9/1/2009

9/1/2010

$

1,500,000

River Rouge-Ann Visger Elementary School

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, Cooling and Boiler upgrades; New roof; New, energy-efficient windows, Update facilities and equipment to use modern, renewable energy; Upgrade/replace outdated electrical systems; Replace old lighting with energy efficient, "green" lighting; Computers and wireless technology in classrooms; reconfigure classrooms; repair damaged concrete/asphalt parking lots; update security systems; repair/replace outdated plumbing systems, Repair cracked/damaged walls and building foundations; Asbestos removal; replace flooring to include new carpeting and tile, painting and landscaping. 9/1/2009

9/1/2010

$

1,500,000

02262009

-N

e u

q e R

t i m

s t s

T O

Route (Infrastructure Only)

D VE $

b u S

River Rouge

P P A

O R

Funding Request

8/15/2011

d e tt

River Rouge

Expected Completion Date

Submitted Requests - Not Approved

576 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

River Rouge School District

River Rouge School District

Project Name

Project Description

Start Date

Expected Completion Date

River Rouge

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, Cooling and Boiler upgrades; New roof; New, energy-efficient windows, Update facilities and equipment to use modern, renewable energy; Upgrade/replace outdated electrical systems; Replace old lighting with energy efficient, "green" lighting; Computers and wireless technology in classrooms; reconfigure classrooms; repair damaged concrete/asphalt parking lots; update security systems; repair/replace outdated plumbing systems, Repair River Rouge-Dunn/Beacon Special Education cracked/damaged walls and building foundations; Asbestos removal; replace flooring to include new carpeting and tile, painting and landscaping. 9/1/2009 Center Program

River Rouge

River Rouge-Buck Weeber Downriver Learning Center

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, Cooling and Boiler upgrades; New roof; New, energy-efficient windows, Update facilities and equipment to use modern, renewable energy; Upgrade/replace outdated electrical systems; Replace old lighting with energy efficient, "green" lighting; Computers and wireless technology in classrooms; reconfigure classrooms; repair damaged concrete/asphalt parking lots; update security systems; repair/replace outdated plumbing systems, Repair cracked/damaged walls and building foundations; Asbestos removal; replace flooring to include new carpeting and tile, painting and landscaping. 9/1/2009

River Rouge-River Rouge High School

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, Cooling and Boiler upgrades; New roof; New, energy-efficient windows, Update facilities and equipment to use modern, renewable energy; Upgrade/replace outdated electrical systems; Replace old lighting with energy efficient, "green" lighting; Computers and wireless technology in classrooms; reconfigure classrooms; repair damaged concrete/asphalt parking lots; update security systems; repair/replace outdated plumbing systems, Repair cracked/damaged walls and building foundations; Asbestos removal; replace flooring to include new carpeting and tile, painting and landscaping. 9/1/2009

T O

O R 9/1/2010

Funding Request

Route (Infrastructure Only)

D VE $

1,500,000

9/1/2010

$

1,500,000

9/1/2010

$

5,000,000

P P A

N s

River Rouge School District

River Rouge

Riverview Community School District Riverview

Riverview Memorial

Riverview Community School District Riverview

Riverview Forest

Riverview Community School District Riverview

Riverview High School

Riverview Community School District Riverview

Riverview Forest

t s e

qu

e R

Upgrade Lighting

6/15/2010

8/31/2010

$

20,000

Upgrade Lighting

7/1/2009

8/31/2009

$

30,000

Emergency Light Fixtures

6/15/2010

8/31/2010

$

38,000

Transformers

7/1/2009

8/31/2009

$

95,000

Riverview Memorial

Transformers

6/15/2010

8/31/2010

$

95,000

Riverview High School

Boiler Replacement

6/15/2010

8/31/2010

$

100,000

Riverview Community School District Riverview

Riverview Seitz MS

Transformers

7/1/2009

8/31/2009

$

240,000

Riverview Community School District Riverview

Riverview Huntington

HVAC Controls

7/1/2009

8/31/2009

$

250,000

tt i m

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

S

d e t

Submitted Requests - Not Approved

577 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Memorial

HVAC Controls

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview High School

Transformers

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview High School

Window Replacement

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Huntington

Window Replacement

6/15/2010

Riverview Community School District Riverview

Riverview High School

HVAC Equipment

Riverview Community School District Riverview

Riverview Seitz MS

HVAC Controls

Riverview Community School District Riverview

Riverview High School

HVAC Controls

Riverview Community School District Riverview

Riverview Seitz MS

Window Replacement

Riverview Community School District Riverview

Riverview Huntington

Additional Receptacles

Riverview Community School District Riverview

Riverview Memorial

Additional Receptacles

Riverview Community School District Riverview

Riverview Forest

Riverview Community School District Riverview

Riverview Huntington

Riverview Community School District Riverview

Riverview Seitz MS

Riverview Community School District Riverview

Riverview Memorial

Funding Request

$

300,000

D VE $

300,000

$

400,000

8/31/2010

$

500,000

6/15/2010

8/31/2010

$

550,000

7/1/2009

8/31/2009

$

800,000

6/15/2010

8/31/2010

$

950,000

6/15/2010

8/31/2010

$

1,100,000

7/1/2009

8/31/2009

$

12,000

6/15/2010

8/31/2010

$

12,000

Additional Receptacles

7/1/2009

8/31/2009

$

15,000

Door Hardware

7/1/2009

8/31/2009

$

15,000

t i m

Additional Receptacles

7/1/2009

8/31/2009

$

20,000

Exterior Tuckpointing

7/1/2009

8/31/2009

$

20,000

Riverview Huntington

Intercom System

6/15/2010

8/31/2010

$

22,000

Riverview Huntington

Exterior Tuckpointing

7/1/2009

8/31/2009

$

25,000

Riverview Community School District Riverview

Riverview Forest

Intercom System

7/1/2009

8/31/2009

$

28,000

Riverview Community School District Riverview

Riverview Forest

ADA Compliance

6/15/2010

8/31/2010

$

45,000

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

S

d e tt

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

578 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Memorial

Intercom System

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Forest

Fire Alarm Upgrades

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview High School

Door Hardware

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Memorial

Emergency Generator

7/1/2009

Riverview Community School District Riverview

Riverview Forest

Window Replacement

Riverview Community School District Riverview

Riverview Memorial

ADA Compliance

Riverview Community School District Riverview

Riverview Huntington

Fire Alarm Upgrades

Riverview Community School District Riverview

Riverview Huntington

Electrical Service

Riverview Community School District Riverview

Riverview Seitz MS

Intercom System

Riverview Community School District Riverview

Riverview Memorial

Fire Alarm Upgrades

Riverview Community School District Riverview

Riverview Huntington

Riverview Community School District Riverview

Riverview Seitz MS

Riverview Community School District Riverview Riverview Community School District Riverview

Funding Request

$

D VE

45,000

$

48,000

$

50,000

8/31/2009

$

50,000

6/15/2010

8/31/2010

$

50,000

6/15/2010

8/31/2010

$

60,000

6/15/2010

8/31/2010

$

60,000

7/1/2009

8/31/2009

$

65,000

7/1/2009

8/31/2009

$

65,000

6/15/2010

8/31/2010

$

70,000

Work Room Expansion

6/15/2010

8/31/2010

$

70,000

ADA Compliance

6/15/2010

8/31/2010

$

75,000

Riverview Huntington

Door Replacements

6/15/2010

8/31/2010

$

85,000

Riverview Forest

Fire Code Upgrades

7/1/2009

8/31/2009

$

90,000

Riverview Forest

Asbestos Removal

6/15/2010

8/31/2010

$

100,000

Riverview Huntington

Asbestos Removal

7/1/2009

8/31/2009

$

100,000

Riverview Community School District Riverview

Riverview Seitz MS

Kitchen Remodel

6/15/2010

8/31/2010

$

100,000

Riverview Community School District Riverview

Riverview Huntington

Kitchen Remodel

6/15/2010

8/31/2010

$

105,000

t i m

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

d e tt

S

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

579 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Huntington

ADA Compliance

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Forest

Electrical Service

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview Memorial

Electrical Service

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Seitz MS

Fire Alarm Upgrades

7/1/2009

Riverview Community School District Riverview

Riverview High School

Intercom System

Riverview Community School District Riverview

Riverview Huntington

Upgrade Lighting

Riverview Community School District Riverview

Riverview Memorial

Asbestos Removal

Riverview Community School District Riverview

Riverview High School

Fire Code Upgrades

Riverview Community School District Riverview

Riverview High School

Fire Alarm Upgrades

Riverview Community School District Riverview

Riverview Seitz MS

Door Replacements

Riverview Community School District Riverview

Riverview Memorial

Riverview Community School District Riverview

Riverview Forest

Riverview Community School District Riverview

Riverview Forest

Riverview Community School District Riverview

Riverview Huntington

Funding Request

$

D VE

120,000

$

120,000

$

120,000

8/31/2009

$

130,000

6/15/2010

8/31/2010

$

130,000

7/1/2009

8/31/2009

$

135,000

6/15/2010

8/31/2010

$

140,000

7/1/2009

8/31/2009

$

150,000

6/15/2010

8/31/2010

$

160,000

7/1/2009

8/31/2009

$

175,000

Boiler Replacement

6/15/2010

8/31/2010

$

200,000

Door Replacements

6/15/2010

8/31/2010

$

200,000

Boiler Replacement

7/1/2009

8/31/2009

$

220,000

Domestic Water Piping

6/15/2010

8/31/2010

$

220,000

Riverview Seitz MS

Fire Code Upgrades

7/1/2009

8/31/2009

$

220,000

Riverview Memorial

Work Room Renovation

6/15/2010

8/31/2010

$

220,000

Riverview Community School District Riverview

Riverview High School

Additional Electrical

6/15/2010

8/31/2010

$

250,000

Riverview Community School District Riverview

Riverview Seitz MS

Boiler Replacement

7/1/2009

8/31/2009

$

250,000

t i m

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

d e tt

S

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

580 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Memorial

Door Replacements

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Seitz MS

Asbestos Removal

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview Seitz MS

Electrical Service

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview High School

Electrical Service

6/15/2010

Riverview Community School District Riverview

Riverview Forest

HVAC Controls

Riverview Community School District Riverview

Riverview Forest

Technology Upgrades

Riverview Community School District Riverview

Riverview Huntington

Technology Upgrades

Riverview Community School District Riverview

Riverview Memorial

Technology Upgrades

Riverview Community School District Riverview

Riverview High School

Door Replacements

Riverview Community School District Riverview

Riverview Huntington

Media Center Expansion

Riverview Community School District Riverview

Riverview Huntington

Riverview Community School District Riverview

Riverview Memorial

Riverview Community School District Riverview

Riverview Seitz MS

Riverview Community School District Riverview

Riverview Huntington

Funding Request

$

D VE

260,000

$

280,000

$

300,000

8/31/2010

$

380,000

7/1/2009

8/31/2009

$

400,000

6/15/2010

8/31/2010

$

400,000

6/15/2010

8/31/2010

$

400,000

6/15/2010

8/31/2010

$

400,000

6/15/2010

8/31/2010

$

410,000

6/15/2010

8/31/2010

$

530,000

Cafeteria Construction

6/15/2010

8/31/2010

$

650,000

Media Center Expansion

6/15/2010

8/31/2010

$

650,000

Technology Upgrades

6/15/2010

8/31/2010

$

700,000

HVAC Equipment

6/15/2010

8/31/2010

$

750,000

Riverview Seitz MS

Science Wing Renovation

6/15/2010

8/31/2010

$

800,000

Riverview High School

Technology Upgrades

6/15/2010

8/31/2010

$

800,000

Riverview Community School District Riverview

Riverview Memorial

Roof Replacement

6/15/2010

8/31/2010

$

850,000

Riverview Community School District Riverview

Riverview Memorial

HVAC Equipment

6/15/2010

8/31/2010

$

900,000

t i m

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

d e tt

S

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

581 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Huntington

Additional Classrooms

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Forest

HVAC Equipment

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Seitz MS

Media Center Expansion

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Forest

Cafeteria Construction

6/15/2010

Riverview Community School District Riverview

Riverview Forest

Roof Replacement

Riverview Community School District Riverview

Riverview High School

Media Center Expansion

Riverview Community School District Riverview

Riverview Seitz MS

Roof Replacement

Riverview Community School District Riverview

Riverview High School

Roof Replacement

Riverview Community School District Riverview

Riverview Seitz MS

HVAC Equipment

Rochester Community School District Rochester

Rochester Community Schools - Rochester High School

Rochester Community School District Rochester

Funding Request

$

950,000

D VE $

950,000

$

950,000

8/31/2010

$

980,000

6/15/2010

8/31/2010

$

1,200,000

6/15/2010

8/31/2010

$

1,500,000

6/15/2010

8/31/2010

$

1,700,000

6/15/2010

8/31/2010

$

1,800,000

7/1/2009

8/31/2009

$

2,300,000

Replace doors and windows beyond their useful life

5/1/2009

8/1/2009 or sooner $

75,000

Rochester Community Schools - Rochester High School

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

130,000

Rochester Community School District Rochester

Rochester Community Schools - McGregor Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

150,000

Rochester Community School District Rochester

Rochester Community Schools Meadowbrook Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

150,000

Rochester Community School District Rochester

Rochester Community Schools - Rochester High School

Skylights - Need full replacement w/ high efficiency

5/1/2009

8/1/2009 or sooner $

150,000

Rochester Community Schools - Rochester High School

Plumbing - Replace lines beyond useful life

6/1/2009

8/1/2009 or sooner $

150,000

Rochester Community Schools - Rochester High School

Paving - Reconstruct areas that are beyond useful life

4/1/2009

8/1/2009 or sooner $

350,000

Rochester Hills

Avondale/Meadows

Upgrade lighting to T-8

6/9/2009

8/9/2009

$

23,025

Rochester Hills

Avondale/Trans

Upgrade lighting to T-8

6/9/2009

8/9/2009

$

25,950

Rochester Hills

Avondale/Trans

Door/Window replacement/repair

6/9/2009

8/9/2009

$

38,696

d e tt

ub

Rochester Community School District Rochester Rochester Community School District Avondale School District Avondale School District Avondale School District

Rochester

02262009

S

N s

st

e u

q e R

t i m

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

582 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District Avondale School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Rochester Hills

Avondale/Deerfield

Playground equip. replacement-safety issue

6/9/2009

8/9/2009

$

75,000

Rochester Hills

Avondale/Middle

Upgrade lighting to T-8

6/9/2009

8/9/2009

$

95,078

Rochester Hills

Avondale/Meadows

RTU w/heat recovery replacement

6/9/2009

8/9/2009

$

107,450

Rochester Hills

Avondale/Middle

Door/Window replacement/repair

6/9/2009

8/9/2009

$

209,373

Rochester Hills

Avondale/Deerfield

Boiler replacement w/controls

6/9/2009

$

240,380

Rochester Hills

Avondale/Middle

RTU w/heat recovery replacement

6/9/2009

8/9/2009

$

264,339

Rochester Hills

Avondale/Deerfield

Door/Window replacement/repair

6/1/2009

8/1/2009

$

281,330

Rochester Hills

Avondale/Deerfield

Upgrade lighting to T-8

6/9/2009

8/9/2009

$

310,376

Rochester Hills

Avondale/Middle

Boiler replacement w/controls

6/9/2009

8/9/2009

$

347,835

Rochester Hills

Avondale/Trans

Replace HVAC system

6/9/2009

8/9/2009

$

486,499

Rochester Community School District Rochester Hills

Rochester Community Schools - Hampton Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Baldwin Elementary

Skylights - Need full replacement w/ high efficiency

5/1/2009

8/1/2009 or sooner $

30,000

Rochester Community School District Rochester Hills

Rochester Community Schools - West Middle School HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

35,000

Rochester Community School District Rochester Hills

Rochester Community Schools - University Hills Elementary

5/1/2009

8/1/2009 or sooner $

50,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Musson Elementary

5/1/2009

8/1/2009 or sooner $

50,000

Rochester Community School District Rochester Hills

Rochester Community Schools - West Middle School Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

65,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Adams High School Replace doors and windows beyond their useful life

5/1/2009

8/1/2009 or sooner $

75,000

O N

HVAC Replace systems beyond their useful life

R d

Replace doors and windows beyond their useful life

e t t

t i m

ub

Rochester Community School District Rochester Hills

S

Rochester Community School District Rochester Hills

s

st

e u

eq

A T

PP

O R 8/9/2009

D VE

Rochester Community Schools - Hugger Elementary

Replace doors and windows beyond their useful life

5/1/2009

8/1/2009 or sooner $

100,000

Rochester Community Schools - Long Meadow Elementary

Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

150,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Adams High School Skylights - Need full replacement w/ high efficiency

5/1/2009

8/1/2009 or sooner $

150,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Brewster Elementary

5/1/2009

8/1/2009 or sooner $

175,000

02262009

HVAC Replace systems beyond their useful life

Submitted Requests - Not Approved

Route (Infrastructure Only)

583 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Rochester Community School District Rochester Hills

Rochester Community Schools - Musson Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

Rochester Community School District Rochester Hills

Rochester Community Schools - Stoney Creek High School

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

200,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hamlin Elementary

Replace doors and windows beyond their useful life

5/1/2009

8/1/2009 or sooner $

200,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Brooklands Elementary

HVAC Replace systems beyond their useful life

5/1/2009

245,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Adams High School HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

255,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Baldwin Elementary

HVAC Replace systems beyond their useful life

P P A

8/1/2009 or sooner $

5/1/2009

8/1/2009 or sooner $

377,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hugger Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

400,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hamlin Elementary

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

405,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hart Middle School

Replace doors and windows beyond their useful life

5/1/2009

8/1/2009 or sooner $

500,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Baldwin Elementary

Replace doors and windows beyond their useful life

5/1/2009

8/1/2009 or sooner $

550,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Baldwin Elementary

Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

600,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Brooklands Elementary

Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

700,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hampton Elementary

Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

700,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hart Middle School

Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

700,000

HVAC Replace systems beyond their useful life

5/1/2009

8/1/2009 or sooner $

770,000

Rochester Community Schools - Adams High School Roofing - Replace sections that are beyond their useful life

5/1/2009

8/1/2009 or sooner $

1,050,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Brewster Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Brooklands Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

d e tt

ub

Rochester Community School District Rochester Hills

S

Rochester Community School District Rochester Hills

02262009

t i m

Rochester Community Schools - Hart Middle School

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

200,000

D VE

584 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Rochester Community School District Rochester Hills

Rochester Community Schools - Hamlin Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

Rochester Community School District Rochester Hills

Rochester Community Schools - Hampton Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hart Middle School

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hugger Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools Meadowbrook Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Musson Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - University Hills Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

20,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Baldwin Elementary

Electrical and/or Fire Alarm system replacements

6/1/2009

8/1/2009 or sooner $

60,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Baldwin Elementary

Paving - Reconstruct areas that are beyond useful life

4/1/2009

8/1/2009 or sooner $

40,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Brooklands Elementary

Paving - Reconstruct areas that are beyond useful life

4/1/2009

8/1/2009 or sooner $

150,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Adams High School Paving - Reconstruct areas that are beyond useful life

4/1/2009

8/1/2009 or sooner $

250,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hamlin Elementary

Paving - Reconstruct areas that are beyond useful life

4/1/2009

8/1/2009 or sooner $

250,000

Rochester Community School District Rochester Hills

Rochester Community Schools - Hampton Elementary

Paving - Reconstruct areas that are beyond useful life

4/1/2009

8/1/2009 or sooner $

300,000

Rochester Community School District Rochester Hills

Rochester Community Schools - North Hill Elementary

Plumbing - connect to City water for improved fire suppression

6/1/2009

8/1/2009 or sooner $

40,000

Gibraltar School District Rogers City Area Schools Rogers City Area Schools Rogers City Area Schools Rogers City Area Schools

d e tt

t i m

ub

N s

st

e u

q e R

T O

P P A

O R

20,000

D VE

Gibraltar School District Barrow Downriver High School

Upgrade Ventilation/provide cooling to building. Replace Hot Water heating boilers, circular pumps and controls (2 separate units per state inspection), Replace toilet and general exhaust, Replace doors and ceiling tiles, Replace current water tank continuous fed urinals to green waterless urinals May, 2009

May, 2010

$

1,250,000

RCHS

Replace gym lights with T-5 HO Fluorescent lights

6/15/2009

8/30/2009

$

7,000

RCHS

Replace corridor heating units

6/15/2009

8/30/2009

$

15,000

Rogers City

RCHS

Boys & Girls Locker Room renovations

6/15/2009

9/30/2009

$

100,000

Rogers City

RCHS

Fire Alarm system upgrade

6/15/2009

9/30/2009

$

50,000

Rockwood Rogers City Rogers City

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

585 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Rogers City Area Schools Rogers City

Romeo Community Schools Palo Community School District Palo Community School District Palo Community School District Ionia Public Schools Roseville Community Schools Roseville Community Schools Roseville Community Schools Roseville Community Schools Roseville Community Schools Roseville Community Schools

Project Name

Project Description

Rogers City Area Schools

Romeo

Convert pneumatic air system for temperature control to digital system

Romeo Community Schools Palo Community Schools Heating Plant Replacement Palo Community Schools Replace Windows on School

Ronald Township

Start Date

Expected Completion Date

4/1/2009

Equipping and re-equipping school buildings for technology systems and equipment; erecting, equipping and furnishing additions to a school building, remodeling, reequipping and refurnishing a school building and preparing, developing and improving the site of a school building for use as a new high school building; erecting, equipping and furnishing additions to school buildings to enhance security and preparing, developing and improving sites for additions to school buildings; remodeling, reequipping, re-furnishing school buildings and other facilities to enhance security, preparing, developing sites at school buildings and other facilities; and erecting, equipping and furnishing a new bus maintenance garage, preparing, developing and improving the site for the new bus maintenance garage and purchasing school buses?6/1/2009

A T

8/30/2009

PP

O R

Funding Request $

20,000

D VE

8/15/2012

$

93,000,000

Replace existing boiler and controls with new energy efficient heating system.

7/1/2009

6/30/2010

$

100,000

Replace existing exterior windows with energy efficient windows on school.

7/1/2009

12/31/2009

$

100,000

7/1/2009 7/9/2009

8/31/2009 12/9/2009

$ $

25,000 20,000

5/1/2009

12/31/2009

$

280,000

5/1/2009

12/31/2009

$

851,000

5/1/2009

12/31/2009

$

1,317,000

5/1/2009

12/31/2009

$

1,317,000

5/1/2009

12/31/2009

$

1,758,000

7/1/2009

6/30/2010

$

896,000

Upgrade Wide Area Network capacity with Point to Point Wireless

8/1/2009

11/1/2009

$

75,000

Upgrade Wide Area Network capacity with Point to Point Wireless

8/1/2009

11/1/2009

$

75,000

Upgrade Wide Area Network capacity with Point to Point Wireless

8/1/2009

11/1/2009

$

75,000

Royal Oak High School

Upgrade Wide Area Network capacity with Point to Point Wireless

8/1/2009

11/1/2009

$

75,000

Royal Oak Transportation Facility

Replace exsisting parking lot, upgrade drainage and water retention

8/1/2009

8/1/2010

$

140,400

School District Of The City Of Royal Oak Royal Oak

Royal Oak Addams Elem.

Replace exsisting parking lot, upgrade drainage and water retention

8/1/2009

11/1/2009

$

224,100

School District Of The City Of Royal Oak Royal Oak

Royal Oak Keller Elem.

Replace exsisting parking lot, upgrade drainage and water retention

8/1/2009

11/1/2009

$

486,000

Ronald Township Ronald Township Ronald Twp Roseville Roseville Roseville

Roseville Roseville

School District Of The City Of Royal Oak Royal Oak

Royal Oak Addams Elem.

School District Of The City Of Royal Oak Royal Oak

Royal Oak Keller Elem.

School District Of The City Of Royal Oak Royal Oak

Royal Oak Middle School

tt i m

ub

School District Of The City Of Royal Oak Royal Oak

02262009

d e t

S

q e R

s

st

e u

Roseville

School District Of The City Of Royal Oak Royal Oak

O N

Palo Community Schools Playground Replace existing playgroup surface and equipment for student safety. Ionia Public Schools Chimney replacement at Boyce Elementary Roseville Community Schools - Network Replace all existing local fax/scan/copy devices with energy efficient multi-funchtion Copier Initiative devices throughout district Roseville Community Schools - Digital Convert analog head end media distribution to support energy efficient digital Broadband Iniative broadband throughout district Roseville Community Schools - Dort Elementary School Upgrade Climate Control Systems with energy efficient systems Roseville Community Schools - Fountain Elementary School Upgrade Climate Control Systems with energy efficient systems Roseville Community Schools - TV/Monitor Iniative Replace high maintainance analog classroom monitors with energy saving monitors Roseville Community Schools - Administration Building Upgrade Climate Control Systems with energy efficient systems

Submitted Requests - Not Approved

Route (Infrastructure Only)

586 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Royal Oak Admin Bldg

Energy & Infrastructure Improvements, new boilers,replace or caulk windows, replace or repair doors, energy management systems, replace and add air conditioning, occupant light sensors, auto flush valves, auto water control for sinks, reduced water use toilets, fire alarm system, fire sprinkle entire building, security and camera systems 8/1/2009

Royal Oak Oakland Elem.

Energy & Infrastructure Improvements, new boilers,replace or caulk windows, replace or repair doors, energy management systems, replace and add air conditioning, occupant light sensors, auto flush valves, auto water control for sinks, reduced water use toilets, fire alarm system, fire sprinkle entire building, security and camera systems 8/1/2009

School District Of The City Of Royal Oak Royal Oak

Royal Oak Oakridge Elem.

Energy & Infrastructure Improvements, new boilers,replace or caulk windows, replace or repair doors, energy management systems, replace and add air conditioning, occupant light sensors, auto flush valves, auto water control for sinks, reduced water use toilets, fire alarm system, fire sprinkle entire building, security and camera systems 8/1/2009

School District Of The City Of Royal Oak Royal Oak

Energy & Infrastructure Improvements, new boilers,replace or caulk windows, replace or repair doors, energy management systems, replace and add air conditioning, occupant light sensors, auto flush valves, auto water control for sinks, reduced water use toilets, fire alarm system, fire sprinkle entire building, security and camera Royal Oak Churchill Community High School systems 8/1/2009

School District Of The City Of Royal Oak Royal Oak

Royal Oak Middle School

Replace exsisting parking lot

Royal Oak

Royal Oak High School

Royalton Township

Lakeshore Hollywood Elem

Royalton Township

Lakeshore Hollywood Elem

Royalton Twp.

SJPS - Clarke Elem

Royalton Twp.

SJPS - Clarke Elem

Royalton Twp.

SJPS - Clarke Elem

School District Of The City Of Royal Oak Royal Oak

School District Of The City Of Royal Oak Royal Oak

School District Of The City Of Royal Oak Lakeshore School District (Berrien) Lakeshore School District (Berrien) St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools

Eastern Upper Peninsula ISD

Rudyard

i m

02262009

4,325,700

8/1/2010

$

5,161,900

8/1/2010

$

7,858,300

8/1/2009

11/1/2009

$

666,900

Replace exsisting parking lot replace domestic water piping through out building and insulate piping to improve energy efficiency and reduce water leakage replace 2500 sq feet of single pane windows with new energy efficient windows to reduce energy leakage Technology in Classrooms - smartboards, interactive materials and infrastructure to integrate technology into instruction. Window replacements - replace 40 year old single pane windows with new energy efficient windows.

8/1/2009

11/1/2009

$

1,252,800

9/1/2009

10/1/2010

$

90,000

7/1/2009

3/1/2010

$

129,000

2/1/2009

8/1/2009

$

350,000

6/1/2009

8/1/2009

$

250,000

New Roof - Full replacement of roof that leaks

6/1/2009

8/1/2009

$

450,000

Our Rudyard Center program provides classroom space for severely disable students from eight of our constituent districts. We are in need of additional classrooms at this center. This project would build two additional classrooms up to LEED gold level certification and provide collaboration and consolidation of services at a greater level across our region. 7/1/2009

9/1/2010

$

360,000

s t s

-N

eq

R d

Special Education Center Expansion

b u S

$

Submitted Requests - Not Approved

P P A

O R 8/1/2010

Route (Infrastructure Only)

D VE

3,886,000

T O

8/1/2010

Funding Request

$

e u

e t tt

Expected Completion Date

587 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw ISD

Saginaw ISD

Saginaw ISD

Saginaw ISD

Saginaw

Saginaw

Saginaw

Saginaw

Project Name

Project Description

Start Date

Expected Completion Date

Saginaw Intermediate School District-RESC

At the RESC building we plan to replace a 1969 American Standard Cast Iron Boiler with two copper fin high efficiency boilers. We also plan to replace all piping, insulation, pumps and boiler controls in order to improve the heating efficiency in this building. Along with the boiler replacement, we also propose to purchase an EMS system to help us further control the environment in this building. We have found that the EMS systems that are in operation in our other two buildings have helped us reduce our consumption of both natural gas and electricity while maintaining a comfortable learning and working atmosphere. In the past year in the two buildings mentioned, we have been able to reduce our carbon footprint the equivalent of 1,008 Metric tons of Carbon Dioxide. The effect of this savings is comparable to removing 181 passenger cars fom the road for one year or planting 25,780 seedling trees and having them grow for ten years. July, 2009

Saginaw Intermediate School District-RESC

The Resc building is over 40 years old with different HVAC systems throughout servicing different portions of the building. The west end of the building is serviced by a system that is 25-30 years old that runs inefficiently. Replacing this HVAC unit and the temperature controls necessary to control it, will help us to further reduce our carbon footprint for this building. August, 2009

PP

O R

Funding Request

D VE

September, 2009

$

172,990

October, 2009

$

55,000

Saginaw Intermediate School District-RESC

The roof on the RESC building is the existing ballasted roof which was built some 30 years ago. The amount of insulation is speculative and there are several leaks present. Repairing this roof is next to impossible due to the age and the materials tha were used. A complete new roofing system would add a significant amount of insulation thereby adding to the efficiency of both the heating and cooling systems. We would propose usning a single ply roof with a 20-25 year warranty. July, 2009

September, 2009

$

60,000

Saginaw Intermediate School District-Millet Learning center

The Millet Learning Center is a very large building, 91,849 Sq. Ft., it is all on one level and could be described as "sprawling". The Millet Learning Center services special needs children. The addition of security cameras would not only add to the security of the building but moreso to the safety of the students within and outside of the building.July, 2009

September, 2009

$

35,000

September, 2009

$

40,000

September, 2009

$

375,000

12/15/2010

$

13,814,134

A T

e u

st

eq

s

O N

Route (Infrastructure Only)

R d

Saginaw ISD

Saginaw Intermediate School DistrictTransitions Center

The Transitions Center is a facility with a goal of serving older special needs students. The purpose of this facility is to train students the skills that will allow them to contribute to society by being able to hold a job and live on their own. This facility also doubles as a conference center where different workshops and meetings are held for all educators from within the ISD and from surrounding distircts as well. Although this building was constructed in 2001, 42,220 Sq. Ft., an addition, 10,100 Sq. Ft. was added and finished in 2007. Additional parking needs have plagued this facility as its use has grown substantially over the past several years, particularly in the area of Professinal Development for local educators. Additional staff parking would allow the existing staff parking to be used to accomodate for this additional growth. July, 2009

Saginaw Intermediate School District-RESC Saginaw Township Community Schools, Westdale Elementary

The current RESC parking lot is the original sub base and HMA material. It has been seal coated many times over the years. The curbing is also original, and in bad repair, as are the catch basins and all associated storm water drainage piping. The township has requested several times to not only reconfigure the curbing but also the lot and drainage system. In re-constructing the lot not only the existing problems of cracks, pot holes and poor drainage would be addressed but also the concerns of the township. July, 2009 New Elementary building with associated sitework, furnishings and equipment. Building designed to gain LEED certification 5/15/2009

e t tt

i m

ub

Saginaw

S Saginaw ISD Saginaw Township Community Schools

Saginaw Saginaw Township

02262009

Submitted Requests - Not Approved

588 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Saginaw Township Community Schools Saginaw Township Community Schools Saginaw Township Community Schools Saginaw Township Community Schools

Saginaw Township

Saginaw Township Saginaw Township

Saginaw Township

Saginaw Township Community Schools Saginaw Township Saginaw Township Community Schools Saginaw Township South Lyon Community Schools Salem Twsp. South Lyon Community Schools Salem Twsp. South Lyon Community Schools Salem Twsp. South Lyon Community Schools Salem Twsp. South Lyon Community Schools Salem Twsp. South Lyon Community Schools Salem Twsp.

Saline Area Schools

Saline Area Schools

Saline Area Schools

Saline Area Schools

Sand Creek Community Schools

Project Name

Project Description

Start Date

Saginaw Township Community Schools, White Replace ceiling and old T-12 fourescent lighting in all existing classrooms with energy Pine Middle efficent fixtures. Re-insulate above ceiling for energy improvements 6/15/2009 Saginaw Township Community Schools, White Replace original heating and ventilating classroom equipment which services all Pine Middle classrooms using underfloor ductwork, with roof top H&V equipment Saginaw Township Community Schools, Classroom/Kindergarten/Media Center/Multi Purpose Rm addition. Additions and Weiss Elementary renovations designed to gain LEED certification Saginaw Township Community Schools, Sherwood Elementary Saginaw Township Community Schools, Arrowwood Elementary Saginaw Township Community Schools, Heritage High School South Lyon Community Schools - Salem Elementary School South Lyon Community Schools - Salem Elementary School South Lyon Community Schools - Salem Elementary School South Lyon Community Schools - Salem Elementary School South Lyon Community Schools - Salem Elementary Schools South Lyon Community Schools - Salem Elementary School

Saline

Sand Creek

02262009

6/15/2009

9/15/2010

D VE

2,805,640

$

7,742,280

9/15/2010

$

8,161,327

Existing Media Center remodeling. Renovations designed to gain LEED certification 6/15/2009

9/15/2010

$

750,000

Replace existing roof that is approaching end of its useful life 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009 Replace food serving line - end of useful life; inappropriate height for elementary students 6/15/2009

8/24/2009

$

400,000

8/24/2010

$

500,000

7/15/2009

$

125,000

Upgrade well system

6/15/2009

8/24/2009

$

50,000

6/15/2009

8/24/2009

$

250,000

6/15/2009

8/24/2010

$

1,690,000

9/1/2009

$

567,000

6/1/2010

$

227,000

11/1/2009

$

42,000

9/1/2009

$

230,000

$

3,650

6/15/2009

Remodel existing 1961 open style classrooms to an enclosed configuration, barrier free classroom. Upgrade old T-12 flourescent lighting to energy efficent fixtures. Renovations designed to gain LEED certification

6/15/2009

A T

Replace old parking lot

st

s

e u

O N

Install air conditioning - No air conditioning currently in building

PP

Joint project with the Saline District Library, Saline Area Schools and Saline Senior Center. Relocate entrance and parking lot for traffic flow safety reasons. New Water and Sewer infrastructure that will meet current local and state standards. Middle school was converted from old high school and current traffic pattern has safety concerns for younger students. 6/1/2009

q e R

9/1/2009

Joint project with Saline Area Schools and Saline Senior Center. Create new entrance for secondary access to the Senior Center for parking lot for traffic flow and emergency access. New Water and Sewer infrastructure that will meet current local and state standards. 8/1/2009

b u S

Security System for Saline High School and Saline Middle School. Reduction of administrative and support personnel makes monitoring the hallways impossible and Saline Area Schools - Saline High and Middle new security system. High School system would be expanded to include athletic Schools facilities and the Middle School would be a new stand alone system. 7/1/2009

Upgrade junior-high school gym lighting to T-8, high efficiency flourescent light fixtures. Minimum savings of 30% on lighting can be achieved with improved visual Sand Creek Community Schools - Jr/Sr High acuity and productivity and increased lighting levels. *Per Introductory Energy Evaluation report by Nicholas Evans, Rebuild Michigan November 7, 2008 School

Submitted Requests - Not Approved

O R 9/15/2010

June 15,2009 (We will need to wait until summer break, since this area is used daily by our students) 7/15/2009

Route (Infrastructure Only)

438,870

$

Saline

tt i m

9/15/2009

Remodel existing 1961 open style classrooms to an enclosed configuration, barrier free classroom. Upgrade old T-12 flourescent lighting to energy efficent fixtures. Renovations designed to gain LEED certification

Plant trees and bushes to create wind breaks on campus near buildings to help reduce wind effect on heating of buildings and walking areas. Increase parking for Saline Area Schools - Saline High School and overflow lot to provide less parking on green areas and to help alleviate traffic flow Woodland Meadows during school and after school events.

Saline Area Schools - Middle Schools

6/15/2009

$

731,450

Saline Area Schools - Middle Schools

d e t

9/15/2009

Funding Request

$

Saline

Saline

Expected Completion Date

589 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Sand Creek Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Upgrade elementary cafeteria/gym lighting to T-8, high efficiency flourescent light fixtures. Minimum savings of 30% on lighting can be achieved with improved visual acuity and productivity and increased lighting levels. *Per Introductory Energy Evaluation report by Nicholas Evans, Rebuild Michigan November 7, 2008. The elementary school is currently at an energy rating of 70; very close to the benchmark score of 75 to be labeled an Energy Star Building.

June 15,2009 (We will need to wait until summer break, since this area is used daily by our students) 7/15/2009

Sand Creek

Sand Creek Community Schools - Ruth McGregor Elementary School

Sand Creek

June 15,2009 (We will need to Upgrade high school gym lighting to T-8, high efficiency flourescent light fixtures. wait until summer Minimum savings of 30% on lighting can be achieved with improved visual acuity and break, since this Sand Creek Community Schools - Jr/Sr High productivity and increased lighting levels. *Per Introductory Energy Evaluation report area is used daily School by Nicholas Evans, Rebuild Michigan November 7, 2008. by our students) 7/15/2009

Sand Creek

Replace boiler and water heater in the Jr/Sr High School building. Current heating system is 24 years-old and by replacing with a more efficient system we would be able to conserve energy. A new boiler would be much more energy efficient. The high school has an Energy Star rating of 17. According to Rebuild Michigan Energy Sand Creek Community Schools - Jr/Sr High Evaluation report, this low score could be attributed to the older HVAC equipment in School the building.

Sand Creek

Replace windows in the Jr/Sr High School Building that are very old and are letting in a lot of cold air. By replacing old windows (or at least the worst of these), will be able Sand Creek Community Schools - Jr/Sr High to conserve energy and reduce heating costs. This improvements would also help School improve the buildings Energy Star rating.

Sand Creek

Sand Creek

Sand Creek

Sand Creek

Sand Creek

02262009

Funding Request

D VE $

3,700

$

7,300

June 15,2009 (It would be best to complete this project during the summer break) 7/15/2009

$

85,000

June 15,2009 (as soon as school is out for summer break) 8/1/2009

$

190,000

5/1/2009

$

8,000

Upgrade elementary lab computers in the computer classroom - total of 28. Computer class is taught by a certified teacher to grades K-6. The district is striving to keep technology up-to-date for all grade levels. Budget pressures make this difficult.

June 15,2009 (as soon as school is out for summer break) 7/1/2009

$

11,480

Replace roof over high school locker rooms. This is an old metal roof that is rusting Sand Creek Community Schools - Jr/Sr High around the screw holes causing the roof to leak. The quote has been received, the School district just needs the funds to complete this project.

June 15,2009 (It would be best to complete this project during the summer break) 8/1/2009

$

18,732

June 15,2009 (as Upgrade Jr/Sr High School open computer lab and computer classroom computers - soon as school is Sand Creek Community Schools - Jr/Sr High total of 78. The open lab is used by all core curriculum classes. It is imperative that out for summer School we keep these computers functioning smoothly and up-to-date. break) 7/1/2009

$

31,980

$

80,000

O R

A T

s

t s e

O N

Last year, AllTel placed a cell phone tower on the district's property. We have obtained the FCC licensing to place our bus radio antenna on this tower to allow for better range and communication with our bus fleet. We are currently in the process of obtaining final cost estimates for relocating our antenna and upgrading our radios and other equipment as required with upcoming changes in the law. We should receive these cost estimates within the next couple of weeks. 4/1/2009

Sand Creek Community Schools

u q e

R d

Sand Creek Community Schools - Ruth McGregor Elementary School

e t tt

i m

b u S

Sand Creek Community Schools

PP

Build a pole barn on the district property for use with the Agricultural and FFA Programs. This barn would mostly be used by the jr/sr high school, but will also be available for use by the elementary classes. The FFA is currently fundraising for this project and is working with an architect on the plans. They have about 1/4 of the estimated cost. This project could be shovel ready within 180 days if we had the funds to complete.

Submitted Requests - Not Approved

June 15,2009 (as soon as school is out for summer break) 8/1/2010

Route (Infrastructure Only)

590 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sand Creek Community Schools

Sand Creek Community Schools

Tri County Area Schools

Tri County Area Schools

Meridian Public Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Sand Creek

Sand Creek Community Schools

Resurface high school student parking lot and bus lot. Both of these lots are in need of repaving. We bid these out over a year ago, but were not able to complete the the project because of the cost. The asphalt is cracking and breaking up; the district is forced to patch and seal each year to try to prevent further deterioration.

June 15,2009 (as soon as school is out for summer break) 8/1/2009

Sand Creek

Replace roof over high school gym. This is also an old metal roof. Although not as bad as the roof listed above, we have had it inspected and it is showing the same signs of rusting around the screw holes and is leaking in places. We have not Sand Creek Community Schools - Jr/Sr High submitted plans or bids for this project yet, but we could have this project ready to go School this summer, within 180 days.

June 15,2009 (It would be best to complete this project during the summer break) 8/1/2009

Sand Lake

Sand Lake

Tri County Area Schools

constructing, furnishing and equipping additions to the middle school and high school buildings; remodeling, re-equipping and refurnishing school buildings' acquiring, installing, equipping and re-equipping school buildings for technology; developing and improving athletic facilities, athletic fields, playgrounds and sites; and acquiring land adjacent to the middle/high school site.

T O

Sanford

s t s

e u

Saranac Saranac Saranac

q e R

95,000

$

12,060,000

$

23,970,000

7/1/2009

$

90,000

8/31/2009

$

15,000

8/31/2009

$

18,000

O R

-N

This site project involves the complete grinding of the existing ashpalt, base restoration and regrading, 3" new ashpalt, and repainting of the high school parking lo and service drives. This parking lot is badly in need of replacement. It is a safety 6/1/2009 Meridian Public Schools- Meridian High Schoolhazard as there are many potholes and loose pieces of ashpalt. Health & Safety: Remove asbestos insulation in tunnels and boiler room and replace Saranac Community Schools with approved insulation material 6/1/2009 Roof Replacement and Energy Savings: Replace existing roof and increase insulation 7/1/2009 Saranac Community Schools/Central Office factor

D VE $

P P A

Tri County Area Schools

constructing, furnishing and equipping additions to and remodeling, refurnishing and re equipping school buildings; acquiring and installing educational technology improvements in school buildings; acquiring land adjacent to the high school/middle school site; and developing and improving athletic fields and sites?

Funding Request

6/1/2009

8/31/2009

$

25,000

Saranac

Saranac Community Schools/Middle School Health & Safety: Replace air conditioning unit in office area/commons Saranac Community Schools/Middle and High School Upgrade Heating System: Replace 5 condensate return pumps

6/1/2009

8/31/2009

$

25,000

Saranac

Saranac Community Schools/High School

6/1/2009

8/31/2009

$

60,000

Saranac

Saranac Community Schools/High School

6/1/2009

8/31/2009

$

80,000

Saranac

Saranac Community Schools/High School Saranac Community Schools?Elementary School

8/31/2009

$

225,000

11/30/2009

$

50,000

Saranac Community Schools/Middle School

Health & Safety: Replace exhaust units on roof (15 units) 6/1/2009 Roof Replacement and Energy Savings: Replace existing roof and increase insulation factor 9/1/2009 Roof Replacement and Energy Savings: Replace existing roof and increase insulation factor 9/1/2009

11/30/2009

$

75,000

Saranac Community Schools/High School

Health & Safety: Install emergency cut off electrical switch in industrial arts classroom6/1/2009

8/31/2009

$

5,000

Saranac Community Schools/High School

Health & Safety: Update drinking fountains in PE area

6/1/2009

8/31/2009

$

15,000

Saranac

Saranac Community Schools/Tech Bldg

Health & Safety- Install exterior security lighting

6/1/2009

9/30/2009

$

20,000

Saranac

Saranac Community Schools/Elementary School

Health & Safety: Increase sidewalk access to Elementary School to make it more safe for students to travel to and from school (foot and bicycle traffic).

6/1/2009

8/31/2009

$

20,000

tt i m

ub

Saranac Saranac Saranac Saranac

02262009

d e t

S

Upgrade Heating System: Modernize boiler controls Energy Savings: Replace classroom, PE, and kitchen light fixtures with energy efficient units.

Submitted Requests - Not Approved

Route (Infrastructure Only)

591 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools Saranac Community Schools

Eastern Upper Peninsula ISD

Sault Ste. Marie Area Schools

Sault Ste. Marie Area Schools

Location City or Township

Project Name

Saranac

Saranac Community Schools/High School

Saranac

Project Description

Start Date

Expected Completion Date

6/1/2009

8/31/2009

$

20,000

Saranac Community Schools/Middle School Health & Safety: Upgrade fire suppression system in Middle School kitchen Saranac Community Schools/Middle and High Health & Safety: Replace doorhardware on classrooms to bring them up to ADA School requirements

6/1/2009

8/31/2009

$

20,000

6/1/2009

8/31/2009

$

24,000

Energy Savings: Install motion switches in all areas

6/1/2009

8/31/2009

$

30,000

Improve landscaping and drainage at the Elementary and High School buildings

6/1/2009

$

30,000

Saranac

Saranac Community Schools Saranac Community Schools/Elementary & High School Saranac Community Schools?Elementary & Middle Schools

Health and Safety: Increase number of student lockers (100 each bldg)

6/1/2009

8/31/2009

$

33,000

Saranac

Saranac Community Schools/High School

Health & Safety: Upgrade all restroom facilities to meet ADA requirements

6/1/2009

8/31/2009

$

48,000

9/30/2009

$

50,000

8/31/2009

$

106,000

9/30/2009

$

150,000

9/30/2009

$

175,000

8/31/2009

$

50,000

Saranac Saranac Saranac

Saranac

Health & Safety: Install cleanup facilities in scene shop

Funding Request

PP

Technology Infrastructure- Expand wireless data transmission to open channels of communication and and sharing of experiences and knowledge between our campus students and our community. 6/1/2009

A T

O R 8/31/2009

D VE

Saranac

Saranac Community Schools Saranac Community Schools?Elementary & Middle Schools

Saranac

Saranac Community Schools

Replace carpeting to eliminate mold potential 6/1/2009 Technology Infrastructure- upgrade network switches to allow for additional transfer of information across the network 6/1/2009

Saranac

Saranac Community Schools Saranac Community Schools/Middle & High School

Health & Safety- Install electronic door hardware on key school building entrances in conjunction with strategically placed surveilence cameras. This project requires extensive wiring and supporting hardware. 6/1/2009 Modernization of Science facilities: Replace and modernize the science lab facilities including additional ventilation. 7/1/2009

Saranac

Saranac Community Schools

Health & Safety: Upgrade Access Road to Elementary School

7/1/2009

9/30/2009

$

120,000

EUPISD Central Office Renovation

Added personnel related to consortium services provide to the LEAs being served require renovation of work space. Upgrade of HVAC system, electrical service, boilers, and lighting to our 1903 constructed building will allow for greater use, lower operational costs, and longer service to our constituents

7/1/2009

9/1/2010

$

754,700

Sault Area Public Schools - Bus Garage

1953 temporary pole barn originally built to house and coil Mackinac Bridge cabling Current conditions include poor air quality from falling insulation panels, non-potable water from piping, high energy costs due to minimal insualtion, and leaking roof. New facility enables a collaborative transportation effort with ISD fleet, with potential for adding other LEAs in a central fleet maintenance center. Many LEAs transport to Sault Schools career center and could exchange for spare buses during repairs and routine maintenance at central facility. Facility plans are for an 18,000 sq. ft. facility on property currently owned by Sault Area Schools. Heating system- "used oil" furnace. June, 2009

August, 2010

$

400,000

Sault Area Career Center

1969 building - Technology infrastructure upgrades to the Career and Technical Education shops and labs. Renovations, storage, and ADA upgrade -restrooms need renovation to meet ADA standards; rooms need paint; corridor doors and hardware replaced; new ceilings in classrooms. Mechanical and electrical - Upgrade air handling unit. Energy management system for better control and efficiency of mechanical systems. Upgrade electrical to support new technology. Most classrooms do not have adequate outlets for technology. Exit lights with more efficient fixtures and other lights upgraded to T-8 fixtures. Public announcement system upgrade. June, 2009

January, 2011

$

972,000

Saranac

Sault Ste. Marie

tt i m

d e t

b u S

Sault Ste. Marie

Sault Ste. Marie

02262009

e u

st

q e R

s

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

592 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sault Ste. Marie Area Schools

Sault Ste. Marie

Project Name

Project Description

Start Date

Expected Completion Date

Sault Area Public Schools - Lincoln Elementary

1950 building - Provide a defined entry canopy and front office expansion to allow only one secure entrance to building. Media center addition which currently exists in classroom and is too small to function properly. Cafeteria addition to provide better use of gym and have multi-use space during school day. Elevator for two-story wing to meet ADA standards. Renovations, storage, ADA upgrade, and asbestos abatement restrooms need renovation to meet ADA standards; 10 classrooms will need asbestos abatement with flooring upgrades; 29 rooms and gym need paint; 42 corridor doors and hardware replaced; lockers refurbished; replace sink base cabintets in classrooms. Mechanical and electrical - Energy management system for better control and efficiency of mechanical systems. Replace classroom sinks. Replace existing unit vents. Replace drinking fountains. Exit lights with more efficient fixtures. Upgrade electrical service and increase outlets to 3 per classroom for technology. Site Needs - Asphalt parking lot; upgrade playground equipment; bus drop area for safer student exchange zone and handicap access. Install security camera system. UJune, 2009

Sault Area Public Schools - Soo Township Elementary

1955 building - Provide a defined entry canopy and front office expansion to allow only one secure entrance to building. Media center addition which currently exists in classroom and is too small to function properly. Cafeteria addition to provide better use of gym and have multi-use space during school day. Replace roof over entire building. Renovations, storage, ADA upgrade, and asbestos abatement -restrooms need renovation to meet ADA standards; replace windows in back corridor; classrooms and gym need paint; provide new ceilings throughout school; infill glass between corridors and classrooms with masonry; 37 corridor doors and hardware replaced; lockers refurbished; replace sink base cabintets in classrooms. Mechanical and electrical - Energy management system for better control and efficiency of mechanical systems. Replace classroom sinks. Replace existing unit vents. Replace fire alarm system to meet current standards. Exit lights with more efficient fixtures. Upgrade electrical service and increase outlets to 3 per classroom for technology. Site Needs - upgrade playground equipment. Install security camera sys June, 2009

P P A

O R

Funding Request

D VE

January, 2011

$

3,255,000

January, 2011

$

3,670,400

Sault Area Public Schools - Washington Elementary

1953 building - Provide a defined entry canopy and front office expansion to allow only one secure entrance to building. Media center addition which currently exists in classroom and is too small to function properly. Kitchen addition - currently less than 400 sq. ft. to serve over 300 kids. Cafeteria addition to provide better use of gym and have multi-use space during school day. Renovations, storage, ADA upgrade, and asbestos abatement -restrooms need renovation to meet ADA standards; 8 classrooms will need asbestos abatement with flooring upgrades; 26 rooms need paint; 30 corridor doors and hardware replaced; new ceilings throughout school. Mechanical and electrical - Replace air handling unit. Current air exchange rate = 0 CFM. Energy management system for better control and efficiency of mechanical systems. Replace fuse box with circuit breaker box and upgrade. Most classrooms do not have adequate outlets for technology. Exit lights with more efficient fixtures and 260 other lights upgraded to T-8 fixtures. Public announcement system added; currently does not have one. Site Needs - Asphalt parking lot; bus and parent drop areJune, 2009

January, 2011

$

3,910,650

EUP Parking lot expansion

EUPISD sponsors and provides almost daily professional development to our constituents. We have spacing for 30 parking spots, including adjacent public parking on the street. We propose to complete a project that will enhance our ability to collaboratively hold PD sessions for our region, there by reducing the need for out of region travel and must upgrade our building accessibility 6/1/2009

10/15/2009

$

249,687

Sault Area Public Schools - district wide

Technology infrastructure upgrades-Upgraded capacity is needed district wide to allow buildings and classrooms to have access to current educational content. Teachers utilize web-based materials and GLCE plans with on-line testing and assessment for students. June, 2009

January, 2011

$

3,000,000

T O

Route (Infrastructure Only)

N s

Sault Ste. Marie Area Schools

Sault Ste. Marie

d e tt

Sault Ste. Marie Area Schools

Eastern Upper Peninsula ISD

Sault Ste. Marie Area Schools

t i m

ub

Sault Ste. Marie

S Sault Ste. Marie

Sault Ste. Marie

02262009

t s e

qu

e R

Submitted Requests - Not Approved

593 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Fire/Safety Modernization

4/20/2009

5/20/2009

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing

Phone System and File Servers

4/20/2009

6/20/2009

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Replace two boilers in HS/MS

4/20/2009

5/15/2009

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Replace roofs on HS and MS

4/20/2009

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Replace and Modernize Heating and A/C Units

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing

Well Modernization

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Computerize Temperature Controls

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Replace Vertical Hot Water Storage Tank 4 1/2' x 10'

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Replace Plumbing

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing

Water Quality Issues

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing HS/MS

Unionville-Sebewaing Area S.D. Sebewaing

Unionville-Sebewaing Elementary

Unionville-Sebewaing Area S.D. Sebewaing Unionville-Sebewaing Area S.D. Sebewaing Unionville-Sebewaing Area S.D. Utica Community Schools Shepherd Public School District Shepherd Public School District

Shelby Twp Shepherd

200,000

5/20/2009

$

250,000

4/20/2009

9/20/2009

$

1,500,000

5/20/2009

7/20/2009

$

10,000

5/20/2009

9/20/2009

$

150,000

7/20/2009

8/30/2009

$

40,000

7/20/2009

7/1/2010

$

55,000

7/20/2009

9/20/2009

$

76,000

Replace Exterior Doors, Windows and Reseal Brickwork

7/20/2009

8/30/2009

$

200,000

Early Learning Center Addition, 3 Classrooms

7/20/2009

7/20/2010

$

495,000

Unionville-Sebewaing HS/MS

Landscaping HS/MS Grounds

4/20/2009

6/20/2009

$

5,000

Unionville-Sebewaing HS/MS

Asphalt Resealing and Replacing

5/20/2009

6/20/2009

$

45,000

Storage Building 40 x 60 7/20/2009 Replace lighting throughout the building with T-8's and rewire, along with room sensors for turning on and off the lights. August '09 Additions/Renovations to the Shepherd Elementary including the installation of a more efficent heating system, light fixtures, and windows. 4/1/2009 Additions/Renovations to the High School including the installation of a more efficient heating system and light fixtures. 4/1/2009 HVAC Systems Renovation - to include geothermal installation and energy management control 5/1/2009 HVAC Systems Renovation - to include geothermal installation and energy management control 5/1/2009

9/30/2009

$

150,000

November '09

$

400,000

8/31/2010

$

12,206,641

8/31/2010

$

12,909,472

5/1/2011

$

448,000

5/1/2011

$

448,000

ub

Utica Community Schools Shepherd Public Schools - Shepherd Elementary

Shepherd Public Schools - High School

Newaygo County Resa Sherman TWP

NC RESA FEAC

Newaygo County Resa Sherman TWP

NC RESA Fremont Center

02262009

D VE $

Unionville-Sebewaing HS/MS

Shepherd

15,000

70,000

t i m

S

$

$

d e tt

Sebewaing

Funding Request

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

594 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Newaygo County Resa Sherman TWP

NC RESA Educational Service Center

HVAC Systems Renovation and energy management control

5/1/2009

5/1/2011

$

1,456,000

Newaygo County Resa Sherman TWP

NC RESA Career Tech Center

5/1/2009

12/1/2010

$

1,654,080

Newaygo County Resa Sherman TWP

NC RESA Career Tech Center

5/1/2009

5/1/2010

$

6,160,000

Newaygo County Resa Sherman TWP

NC RESA Career Tech Center

5/1/2009

5/1/2011

$

2,067,600

Newaygo County Resa Sherman TWP

NC RESA Fremont Center

Repair/replace electrical wiring & lighting systems HVAC Systems Renovation - to include geothermal installation and energy management control Improve safety and security of building occupants by redesigning entrances and installation of access control points throughout the building Improve wireless technologies, infrastructure and upgrades including fiber optics and computers

$

40,000

Newaygo County Resa Sherman TWP

NC RESA Career Tech Center

Bring the CTC into fire and safety compliance with renovations including fire alarm improvements, sprinkler systems, security equipment, and ADA compliance

6/1/2009

6/1/2011

$

1,033,800

Newaygo County Resa Sherman TWP

NC RESA Educational Service Center

Repair/replace electrical wiring & lighting systems

5/1/2009

5/1/2010

$

2,480,000

South Haven Public Schools

Erecting, furnishing and equipping additions to, and partially remodeling, furnishing and refurnishing, equipping and re-equipping the L.C. Mohr High School; acquiring, installing and equipping educational technology for the high school; and developing and improving the site.

$

24,385,000

$

29,770,000

9/15/2009

$

124,497

9/15/2009

$

228,010

6/15/2009

9/15/2009

$

230,984

6/15/2009

7/15/2010

$

5,800,000

Replace existing roof that is approaching end of its useful life

6/15/2009

8/24/2009

$

500,000

Replace existing roof that is approaching end of its useful life

6/15/2009

8/24/2009

$

500,000

Replace roof that has reached end of its useful life

6/15/2009

10/15/2009

$

60,000

Replace old boilers, all classroom univents and rooftop units

6/15/2009

8/24/2010

$

200,000

Replace old boilers, all classroom univents and rooftop units

6/15/2009

8/24/2010

$

300,000

10/15/2010

$

410,000

8/24/2010

$

750,000

8/24/2010

$

750,000

8/24/2009

$

815,000

8/24/2010

$

1,000,000

South Haven Public Schools

South Haven

T O

P P A

South Haven Public Schools South Haven South Lyon Community Schools South Lyon

erecting, furnishing and equipping additions to and partially remodeling, furnishing, an refurnishing, equipping and re-equipping the high school; constructing, equipping, developing and improving athletic and physical education facilities and play fields; constructing, equipping and installing energy conservation improvements; and South Haven Public Schools developing and improving sites. South Lyon Community Schools - South Lyon Replace South Lyon High Schools' Analog telephone system with an up to date High School. modern IP telephony system. 6/15/2009

South Lyon Community Schools South Lyon

South Lyon Community Schools - Bartlett, Brummer, Dolsen, Hardy, Kent Lake, Salem, and Sayre elementary schools.

South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon

South Lyon Community Schools - South Lyon High School, Cenennial Middle School, and Millennium Middle School. South Lyon Community Schools - District School Bus Fleet South Lyon Community Schools - Sayre Elementary School South Lyon Community Schools - Bartlett Elementary School South Lyon Community Schools Administration Building South Lyon Community Schools - Sayre Elementary School South Lyon Community Schools - Bartlett Elementary School South Lyon Community Schools Administration Building South Lyon Community Schools - Centennial Middle School South Lyon Community Schools - Millennium Middle School South Lyon Community Schools - South Lyon High School South Lyon Community Schools - South Lyon High School

02262009

tt i m

S

ub

d e t

N s

st

e u

Replace the following Schools' Analog telephone system with an up to date modern IP telephony system. Bartlett, Brummer, Dolsen, Hardy, Kent Lake, Salem, and Sayre elementary schools. 6/15/2009

q e R

Replace South Lyon High School, Cenennial Middle School, and Millennium Middle Schools' Analog telephone system with an up to date modern IP telephony system. Replace bus fleet with environmentally friendly and fuel efficient propane buses. Install propane fuel station

Replace inefficient and ineffective HVAC system 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009 LEED Green Conversion: Integrate building management system with energy efficien improvements 6/15/2009 Install Additional Chiller: Provide air conditioning capacity to meet the existing building needs, based on current student enrollment 6/15/2009 G-Wing Window Replacement: Eliminate leaks in classrooms in the special education wing 6/15/2009

Submitted Requests - Not Approved

O R

6/1/2009

6/1/2011

D VE

Route (Infrastructure Only)

595 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon

Project Name Project Description South Lyon Community Schools - Millennium Middle School Replace old boilers, rooftop units, air handlers, pumps, etc. South Lyon Community Schools - South Lyon High School Replace old boilers rooftop units, air handlers, pumps, etc. School Bus GPS System: Provide real time tracking of each bus location for South Lyon Community Schools emergency situations and daily monitoring South Lyon Community Schools - Millennium Replace old public address system that currently requires continual maintenance and Middle School experiences failures

South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon

South Lyon Community Schools - South Lyon High School South Lyon Community Schools - South Lyon High School South Lyon Community Schools - Sayre Elementary School South Lyon Community Schools

South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon

District Remote Lobby Security System: Provide touch screen kiosks for visitor sign in; takes photos of visitors and prints badges, performs instant back ground checks South Lyon Community Schools against national sex offender list South Lyon Community Schools - South Lyon North Parking Paving Replacement: Replace worn parking area for faculty and High School visitors South Lyon Community Schools - South Lyon South Parking Paving Replacement: Replace worn parking area for student, senior High School center, community, and athletic parking South Lyon Community Schools - Centennial Middle School Replace old staff parking lot South Lyon Community Schools - South Lyon Art Room expansion: Provide state of the art capability and equitability with other High School District High School

South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon

South Lyon Community Schools South Lyon Community Schools - South Lyon High School South Lyon Community Schools - Sayre Elementary School

South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon South Lyon Community Schools South Lyon

South Lyon Community Schools - South Lyon High School South Lyon Community Schools - South Lyon High School South Lyon Community Schools - Sayre Elementary School South Lyon Community Schools - Bartlett Elementary School

itt

S

m b u

South Lyon Community Schools South Lyon, MI South Lyon Community Schools South Lyon, MI South Lyon Community Schools South Lyon, MI South Lyon Community Schools South Lyon, MI

02262009

d e t

Gymnasium Accoustics Upgrade: Eliminate sound reverberation in gymnasium for athletic events, school assemblys, and large community events Main Entrance Doors and Courtyard: Repair sidewalk and upgrade landscaping and the main entry area Replace food serving line - end of useful life; inappropriate height for elementary students School Bus Digital Camera Systems: Install digital 4-camera systems on buses with no current camera capability

T O

s t s

Start Date

8/24/2010

$

1,000,000

6/15/2009

8/24/2010

$

1,500,000

6/15/2009

8/24/2009

$

60,000

6/15/2009

8/24/2009

$

75,000

$

90,000

8/24/2009

$

125,000

6/15/2009

7/15/2009

$

125,000

6/15/2009

8/24/2009

$

125,000

6/15/2009

8/24/2009

$

150,000

6/15/2009

8/24/2009

$

200,000

6/15/2009

8/24/2009

$

400,000

6/15/2009

8/24/2009

$

400,000

6/15/2009

8/24/2009

$

450,000

8/24/2009

$

500,000

8/24/2009

$

750,000

O R

6/15/2009

P P A

-N

e u

Funding Request

6/15/2009

6/15/2009

District Wide Electronic Access System: Provide electronic keyless entry system for all District buildings; reduces cost of key maintenance and provides greater security 6/15/2009 Relocate Main Office from second floor to first floor near main entrance for better community access and improved security 6/15/2009

q e R

Expected Completion Date

8/24/2009

D VE

Replace worn parking lot, and install underground storm system

6/15/2009

8/24/2009

$

800,000

Physical education storage and dance studio expansion: Provides greater dance studio capability and much needed storage for physical education and athletics

6/15/2009

10/26/2009

$

850,000

Expand choir and band rooms to meet needed school capacities

6/15/2009

8/24/2009

$

875,000

Install air conditioning - No air conditioning currently in building

6/15/2009

8/24/2010

$

1,950,000

Install air conditioning - No air conditioning currently in building

6/15/2009

8/24/2010

$

2,200,000

9/15/2009

$

217,500

9/15/2009

$

300,000

9/15/2009

$

472,000

9/15/2009

$

472,500

Replace 145 High School CRT TV's with energy efficient, programmable, and network South Lyon Community Schools - South Lyon manageable LCD TV's. A reduction in energy consumption and energy effeciency will High School be realized. 6/15/2009 South Lyon Community Schools -South Lyon Replace current High School analog broadcast studio production equipment with up to High School date all digital broadcast equipment. 6/15/2009 Replace current District Wide Analog telephone system with a up to date modern IP South Lyon Community Schools telephony system. 6/15/2009 South Lyon Community Schools - South Lyon Replace 315 Secondary School CRT TV's with energy efficient, programmable, and network manageable LCD TV's. A reduction in energy consumption and energy High School, Millennium Middle School, Centennial Middle School. effeciency will be realized.

Submitted Requests - Not Approved

6/15/2009

Route (Infrastructure Only)

596 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

South Lyon Community Schools South Lyon, MI

South Lyon Community Schools

Replace 585 District wide CRT TV's with energy efficient, programmable, and network manageable LCD TV's. A reduction in energy consumption and energy effeciency will be realized. 6/15/2009

9/15/2009

South Lyon Community Schools South Lyon, MI

South Lyon Community Schools - South Lyon Replace 240 computer systems that occupy 8 computer labs in South Lyon High High School, Cenennial Middle School, and School, Cenennial Middle School, and Millennium Middle School with energy efficient, Millennium Middle School. Gold EPEAT rated computer systems. 6/15/2009

9/15/2009

South Lyon Community Schools South Lyon, MI

South Lyon Community Schools - South Lyon Replace 355 computer systems that occupy 12 computer labs in South Lyon High High School, Cenennial Middle School, and School, Cenennial Middle School, and Millennium Middle School with energy efficient, Millennium Middle School. Gold EPEAT rated computer systems. 6/15/2009

9/15/2009

South Lyon Community Schools South Lyon, MI

South Lyon Community Schools - Hardy, Bartlett, Brummer, Dolsen, Kent Lake, Salem, and Sayre Elementaries, South Lyon High School, Cenennial Middle School, and Millennium Middle School.

Southfield Public School District

Southfield

Building Environmental Systems-Ventilation & A/C: The majority of Southfield School facilities were constructed in the 1950s and ‘60s. Most of the older facilities are without air conditioning. We have more and more students who are suffering from severe asthma. Air condition and improved air handling systems would greatly help. We would like to install air conditioning in at Southfield-Lathrup High School, Brace1). Southfield-Lathrup H.S., 2). Brace-Lederle Lederle K-8 School and Stevenson Elementary. The latter two schools have new K-8 School, 3). Southfield education center, univents that are a/c ready but need piping and a chiller in order for air conditioning to 4). Adlai Stevenson School occur. 6/1/2009

Western School District

Spring Arbor

Western School District-Bus Garage

Springfield

School District of the City of Battle Creek New Middle School

Springport Public Schools

Springport

Springport Public Schools- Elementary

Springport Public Schools Springport Public Schools Springport Public Schools Springport Public Schools Springport Public Schools Springport Public Schools Springport Public Schools Springport Public Schools Springport Public Schools

$

877,500

D VE $

288,000

$

426,000

9/15/2009

$

696,000

9/1/2010

$

2,000,000

Three district regular buses to replace aging buses that are less reliable. The district goal for replacing buses has lapsed to a 12 year fleet turnover rate. 1/20/2009

8/31/2009

$

225,000

New middle school to replace 3 existing middle schools / new school will accommodate 1200 students organized into 3 smaller learning communities / new school will include innovative program supported with seamless technology / designed to gain LEED Certification 8/1/2009

9/1/2010

$

52,000,000

Paint all Elementary classrooms,hallways and restrooms. It has been a very long time since this has been done. The environment in the school would be much improved. 6/15/2009

8/31/2009

$

15,000

Replace 580 computer systems that occupy Hardy Elementary School, 7 Elementary Media Centers and, 13 computer labs in South Lyon High School, Cenennial Middle School, and Millennium Middle School with energy efficient, Gold EPEAT rated computer systems. 6/15/2009

A T

Battle Creek Public Schools

Funding Request

e u

st

q e R

s

PP

O R

O N

8/31/2009

$

15,000

Springport

Paint all Elementary classrooms,hallways and restrooms. It has been a very long time Springport Elementary since this has been done. The environment in the school would be much improved. 6/15/2009 Springport Public Schools-District parking lots and drives Repair manholes, repair cracks, and deteriorating asphalt 6/15/2009

8/31/2009

$

15,000

Springport

District parking lots and drives

Springport

itt

d e t

Repair manholes, repair cracks, and deteriorating asphalt

6/15/2009

8/31/2009

$

15,000

Springport Public Schools-Bus Garage

Replace bus radios that are failing in our buses . They need to be changed to a narrow band.Our current reception is very poor and creates safety concerns

4/1/2009

5/30/2009

$

18,000

Springport Bus Garage

Replace bus radios that are failing in our buses . They need to be changed to a narrow band.Our current reception is very poor and creates safety concerns

4/1/2009

5/30/2009

$

18,000

Springport Public Schools- Middle School

Install a lift on the stage to make the facility in compliance with ADA

6/15/2009

7/31/2009

$

30,000

Springport

Springport Middle School

7/31/2009

$

30,000

Springport

Springport Public Schools-Maint. Garage

6/30/2009

$

41,000

Springport

Springport Maint. Garage

Install a lift on the stage to make the facility in compliance with ADA 6/15/2009 Replace maintenance equipment that the district is in great need of. We need a used truck and payloader to complete the work on our grounds. 4/1/2009 Replace maintenance equipment that the district is in great need of. We need a used truck and payloader to complete the work on our grounds. 4/1/2009

6/30/2009

$

41,000

Springport

Springport Springport

02262009

u S

bm

Submitted Requests - Not Approved

Route (Infrastructure Only)

597 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Springport Public Schools Springport Springport Public Schools Springport

Springport Public Schools

Springport Public Schools

Springport Public Schools

Springport Public Schools

Project Name Springport Public Schools-Bus Garage

Project Description Purchase of two buses for our fleet. Our district is very rural and covers more than 103 square miles. Purchase of two buses for our fleet. Our district is very rural and covers more than 103 square miles.

Start Date

Expected Completion Date

Funding Request

4/1/2009

8/31/2009

$

140,000

4/1/2009

8/31/2009

$

140,000

Springport

Replacement computers in classrooms and computer labs to provide students with the necessary tools for online learning and teaching programs. This will provide Springport Public Schools-All 3 district schools assurance to continue to follow the district technology plan.

6/15/2009

8/31/2009

$

180,000

Springport

Springport All 3 district schools

Replacement computers in classrooms and computer labs to provide students with the necessary tools for online learning and teaching programs. This will provide assurance to continue to follow the district technology plan.

6/15/2009

8/31/2009

$

180,000

Springport

Replace the roofs at the High School and Elementaty Schools. This will eleminate the Springport Public Schools-Elementary School leaks and damage being caused by the roofs in disrepair.We are concerned regarding and High School structural damage that can be caused by the leaks that are occuring. 5/1/2009

8/31/2009

$

585,068

Springport

Springport Elementary School and High School

8/31/2009

$

585,068

9/1/2010

$

75,000

7/29/2009

$

750,000

4/30/2009

$

500,000

Bus Garage

T O

P P A

O R

Replace the roofs at the High School and Elementaty Schools. This will eleminate the leaks and damage being caused by the roofs in disrepair.We are concerned regarding structural damage that can be caused by the leaks that are occuring. 5/1/2009

-N

D VE

Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb)

St Clair Shores

Lakeview Public Schools

St Clair Shores

Lakeview Public Schools

Renovation of music and band rooms at Lakeview High School to include new storage lockers for equipment, new flooring, ceiling and acoustical panels 6/15/2010 Renovations of existing elementary school wing to bring area up to current code requirements 3/18/2009

Lakeview Public Schools (Macomb)

St Clair Shores

Lakeview Public Schools

500 Student Computers to replace district-wide student and teacher computers that were purchased in 2002, which are at the end of their life cycle

St, Charles

Harley Outdoor Education needs to replace the roof on the Fowler School house, the cabin and the coal mine museum. The Fowler School house is is a one room school house in which students work on their class projects during their stay at Hartley, the Saginaw Intermediate School District-Hartley cabin is used to show students how their ancestors lived, and the coal museum shows students about our history with coal mining. July, 2009 Outdoor Education Center

October, 2009

$

21,800

St, Charles

Hartely Outdoor Education Center is a facility that is used by all 13 of local education agencies within Saginaw County and to local education agencies outside of Saginaw County to provide hands on science and outdoor experiences to 4th, 5th and 6th graders. To extend the natural gas pipeline to the main building. This would provide Saginaw Intermediate School District-Hartley the Center with significant savings on heating the building that is nore efficient and Outdoor Education Center cleaner to our environment. July, 2009

September, 2009

$

50,000

St, Charles

Hartley Outdoor Education Center provides a 2 1/2 day program for the 4th, 5th and 6th grades which encompasses the students and staff staying on-site overnight. Improved outdoor lighting and installing an emergency generator is needed for security and safety is being requested. Several times we have had students stranded Saginaw Intermediate School District-Hartley here without power. The Hartley Center could be used as an emergency shelter for Outdoor Education Center this area. July, 2009

September, 2009

$

51,750

Saginaw Intermediate School DistrictTransitions Center, Millet Learning Center, and the RESC building

July, 2009

October, 2009

$

400,000

Hartely Outdoor Education Center needs a multi-purpose room for the 4th, 5th and 6th grade students to be able to have recreational activities during the day and evening Saginaw Intermediate School District-Hartley hours. This multipurpose would also be used by school districts who use the Center for Leadership activies of students, team-building activities, etc. July, 2009 Outdoor Education Center

January, 2010

$

690,000

Saginaw ISD

Saginaw ISD

Saginaw ISD

Saginaw ISD

Saginaw ISD

St, Charles

St, Charles

02262009

d e tt

s t s

e u

q e R

2/1/2009

it

S

m b u

Purchase technolog to monitor and control the heating, ventiliation and cooling systems for all of our buildings into one system to become more efficient and save energy.

Submitted Requests - Not Approved

Route (Infrastructure Only)

598 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Saginaw ISD

St, Charles

Project Name Project Description Saginaw Intermediate School District-Hartley Hartley Outdoor Education Center is requesting funding to construct an outdoor Outdoor Education Center observatory for astronomy and weather studies.

Saginaw ISD St. Ignace Area Schools

St, Charles

Saginaw Intermediate School District-Hartley Hartley Outdoor Education Center needs to renovate and expand the asphalt trail Outdoor Education Center system which includes the confidence course and the recreation area.

July, 2009

January, 2010

$

172,500

St. Ignace

St. Ignace Area Schools

Woody Bio Mass heating system designed to replace existing fossil fuel system

7/1/2009

7/1/2011

$

580,000

St. Ignace

St. Ignace Area Schools

Reconfigure Middle School Office main entrance to allow visibility of visitors entering building. Currently there is no visiblity and no monoriting of anyone entering building. 7/1/2009

$

25,000

St. Ignace Area Schools

Parking Lot Safety Project to improve safety of parking lot by removing traffic congestion by making a by pass. This would allow safety for children walking to and from school 7/1/2009

7/1/2011

$

300,000

7/1/2009

7/1/2011

$

626,400

4/1/2009

6/1/2009

$

90,000

$

73,975,000

8/1/2009

$

3,000,000

8/1/2009

$

100,000

St. Ignace Area Schools St. Ignace Area Schools

St. Ignace

St. Ignace Area Schools

St. Ignace

Clinton County Resa

St. Johns

St. Johns Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools St. Joseph Public Schools

St. Joseph Public Schools

St. Ignace Area Schools Clinton County Regional Education Service Agency

St. Johns

St. Johns Public Schools

St. Joseph

SJPS - HS

St. Joseph

SJPS - HS

St. Joseph

SJPS - Lincoln Elem

St. Joseph

SJPS - Lincoln Elem

St. Joseph

SJPS - HS

St. Joseph

SJPS - HS

St. Joseph

SJPS - Lincoln Elem

St. Joseph

SJPS - Lincoln Elem

St. Joseph

SJPS - HS

T O

November, 2009

Construct new classrooms, new lockers, furniture, instructional technology, sitework for new additions and upgrade site utilities, buses, equipment,roof, flooring, security upgrades, mechanical and electrical upgrades, new gym, new pool, and reconstruct athletics. Technology in Classrooms - smartboards, interactive materials and infrastructure to integrate technology into instruction. 2/1/2009 Pool Deck Tile - remove and replace 50 year old tile on pool deck that is cracked and chipped 6/1/2009

s t s

-N

e u

$

D VE

8/1/2009

$

150,000

6/1/2009

8/1/2009

$

500,000

New Roof - Partial replacement of roof that leaks Science Lab remodels - update and remodel 50 year old science lab to incorporate technology and up-to-date science equipment. Technology in Classrooms - smartboards, interactive materials and infrastructure to integrate technology into instruction. Bathroom upgrades (ADA) - current bathrooms are not accessible and we would like to make them accessible.

6/1/2009

8/1/2009

$

1,000,000

6/1/2009

8/1/2009

$

3,000,000

2/1/2009

8/1/2009

$

400,000

6/1/2009

8/1/2009

$

200,000

8/1/2009

$

825,000

8/1/2009

$

400,000

8/1/2009

$

100,000

8/1/2009

$

175,000

8/1/2009

$

200,000

St. Joseph Twp.

SJPS - Brown Elem

Office safety/security - current entry allows direct access to classrooms without entering the office first. Want to remodel and expand office area to make this happen 6/1/2009 Technology in Classrooms - smartboards, interactive materials and infrastructure to integrate technology into instruction. 2/1/2009 Hallway tile replacement - replace existing hallway tile with single tile. Current tile is o various ages and conditions. 6/1/2009 Electrical service upgrade - current electrical service and infrastructure cannot handle existing electrical needs or any expansion for technology. 6/1/2009 Kitchen upgrade - renovate & expand kitchen. Currently undersized to handle current and future enrollments. 6/1/2009

St. Joseph Twp.

SJPS - Brown Elem

New Boiler - replace 40 year old boiler with new staged boilers.

6/1/2009

8/1/2009

$

250,000

SJPS - Brown Elem

Office safety/security - current entry allows direct access to classrooms without entering the office first. Want to remodel and expand office area to make this happen Also need to separate bus and car traffic at pickup and drop-off times of the day. 6/1/2009

8/1/2009

$

825,000

St. Joseph Twp.

u S

St. Joseph Twp.

St. Joseph Twp.

St. Joseph Twp.

02262009

bm

SJPS - Brown Elem

SJPS - Brown Elem SJPS - Brown Elem

Submitted Requests - Not Approved

Route (Infrastructure Only)

40,000

6/1/2009

R d

e t t

O R 8/31/2009

Funding Request

New Roof - Partial replacement of roof that leaks Window replacements - replace 70 year old single pane windows with new energy efficient windows.

eq

it

July, 2009

P P A

Build a bus garage to house buses and for maintenance. Currently there is not a heated bus garage to house current fleet. Construction would allow for better maintenace and this would allow for longer bus life. Generator backup power for data center

Start Date

Expected Completion Date

599 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Louis Public Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Standish-Sterling Community Schools Utica Community Schools Macomb ISD

Project Name

Project Description

Start Date

Expected Completion Date

St. Louis

St. Louis Public Schools

erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping school district buildings; erecting, furnishing and equipping a new bus maintenance facility; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving sites, playgrounds and athletic fields and facilities.

standish

Standish Elementary #4049

Roof repairs

6/10/2009

standish

Standish Sterling High School #4050

Insulate ceiling at all entrances

6/10/2009

standish

Standish Sterling Middle School #8902

New roof on administration building

6/10/2009

standish

Standish Elementary #4049

Motion detector lights for all rooms

6/10/2009

standish

Standish Sterling High School #4050

Field House Entrance Room

standish

Standish Sterling Middle School #8903

Motion detector lights for all rooms

standish

Standish Elementary #4049

Zone heating control for classrooms / computerized

standish

Standish Sterling High School #4050

Motion detector lights for all rooms

standish

Standish Elementary #4049

Insulated Outside classroom doors

standish

Standish Sterling Middle School #8901

Rain Flashing at the Band room

standish

Standish Sterling High School #4050

Scoreboard for soccer field

standish

Standish Sterling Middle School #8901

standish

Standish Sterling High School #4050

standish

Standish Sterling Middle School #8901

standish

Funding Request

D VE $

9,285,000

$

2,000

$

4,000

PP

1 week

$

5,000

8 weeks

$

19,000

6/10/2009

8 weeks

$

20,000

6/10/2009

8 weeks

$

23,000

6/10/2009

8 weeks

$

27,000

6/10/2009

8 weeks

$

28,000

6/10/2009

8 weeks

$

50,000

6/10/2009

1 week

$

1,000

6/10/2009

8 weeks

$

12,000

Baseball Softball Scoreboards

6/10/2009

8 weeks

$

25,000

sloping the curbs for easier snow removal

6/10/2009

10 weeks

$

25,000

Parking lot paving

6/10/2009

8 weeks

$

50,000

Standish Sterling Middle School #8904

Addition for grounds / maintenace facility

6/10/2009

8 weeks

$

125,000

sterling

sterling elementary #4068

Motion detector lights for all rooms

6/10/2009

8 weeks

$

9,000

sterling

sterling elementary #4068

6/10/2009

8 weeks

$

12,000

Utica Community Schools Bozymowski Center

Insulated Outside doors Replace lighting throughout the building with T-8's and rewire, along with room sensors for turning on and off the lights. Replace windows with energy efficient type

August '09

November '09 8/11/2009

$ $

400,000 500,000

$

112,500,000

$

13,050

m b u

Sterling Heights Sterling Heights

O N

R d

e t t

it

st

e u

eq

s

A T

Utica Community Schools

Sterling Heights

Utica Community Schools

Acquiring and installing technology infrastructure and equipment in and for the purpose of connecting all school district buildings; remodeling and/or constructing additions primarily to expand spaces at existing secondary schools, including media centers and gymnasiums; equipping, furnishing, reequipping and/or refurnishing school district buildings, and acquiring school buses; improving and developing sites, including playgrounds and outdoor athletic facilities, and remodeling existing school district buildings, including security, mechanical and other infrastructure improvements.

Stockbridge Community Schools

Stockbridge

Stockbridge Community School District, Stockbridge Middle School

Install heavy duty window screens to allow fresh air to enter classrooms when the weather is moderate so air quality is better and air conditioning is not needed.

S 02262009

Submitted Requests - Not Approved

6/1/2009

8 weeks

O R 1 week

12/31/2009

Route (Infrastructure Only)

600 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Expected Completion Date

Submitting Agency Stockbridge Community Schools Stockbridge Stockbridge Community Schools Stockbridge Stockbridge Community Schools Stockbridge

Project Name Project Description Start Date Stockbridge Community School District, Howlett Elementary School Replace ceiling lights in gymnasium classroom with energy efficient models. 6/1/2009 Stockbridge Community School District, Katz Elementary School Replace ceiling lights in gymnasium classroom with energy efficient models. 6/1/2009 Stockbridge Community School District, Stockbridge High School Replace 45 year old walk in kitchen freezers and coolers with energy efficient models. 6/1/2009

12/30/2009

Stockbridge Community Schools

Stockbridge Community School District, Heritage Elementary School

Plant shade trees in the area of the elementary school to reduce sun exposure to buildings and improve green space park areas for public and student use.

10/30/2009

Stockbridge

Stockbridge Community School District, Smith Elementary School Stockbridge Community School District, Stockbridge High School

Plant shade trees in the area of the elementary school to reduce sun exposure to buildings and improve green space park areas for public and student use. Plant shade trees in the area of the high school to reduce sun exposure to buildings and improve green space park areas for public and student use.

Stockbridge

Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Smith Elementary School Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Howlett Elementary School Stockbridge Community School District, Katz Elementary School

Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools

Stockbridge

Stockbridge

Stockbridge Stockbridge Stockbridge Stockbridge

Stockbridge Stockbridge Stockbridge Stockbridge Stockbridge

tt i m

Stockbridge Stockbridge

ub

Stockbridge Stockbridge Stockbridge Stockbridge Stockbridge Stockbridge Stockbridge

02262009

Stockbridge Community School District, Heritage Elementary School Stockbridge Community School District, Howlett Elementary School Stockbridge Community School District, Katz Elementary School Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Heritage Elementary School Stockbridge Community School District, Smith Elementary School Stockbridge Community School District, Heritage Elementary School Stockbridge Community School District, Smith Elementary School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge High School

S

d e t

Funding Request

12/31/2009

$

17,400

9/30/2010

$

17,400

$

18,125

$

21,750

PP

8/30/2009

$

21,750

10/30/2009

$

21,750

Plant shade trees in the area of the middle school to reduce sun exposure to buildings and improve green space park areas for public and student use. 6/1/2009

8/30/2009

$

21,750

Pave or gravel a 1/3 mile walking path in the green space park area of the Smith Elementary School grounds to improve and increase student and public use.

6/1/2009

8/31/2010

$

29,000

Replace partially functioning water softener system with an energy efficient model. 6/1/2009 Replace with energy efficient models the partially functioning water softeners that are at the end of their service life. 6/1/2009 Replace with energy efficient models the partially functioning water softeners that are at the end of their service life. 6/1/2009

8/30/2009

$

33,250

12/31/2009

$

36,250

12/31/2009

$

36,250

09/31/2010

$

37,700

12/31/2009

$

45,313

12/31/2009

$

45,313

09/31/2009

$

45,675

8/31/2009

$

61,988

8/31/2009

$

71,050

8/31/2010

$

72,500

12/31/2009

$

72,500

6/1/2009

6/1/2009

6/1/2009

A T

e u

st

s

O N

Pave a 1/2 mile walking path in the green space park area of the Heritage Elementary School grounds to improve and increase student and public use. 6/1/2009 Replace with energy efficient models the outdated and partially functional domestic ho water heaters that are at the end of their service life. 6/1/2009 Replace with energy efficient models the outdated and partially functional domestic ho water heaters that are at the end of their service life. 6/1/2009 Replace with energy efficient models the 45 year old domestic hot water heaters that are at the end of their service life. 6/1/2009 Replace with energy efficient models the partially functioning domestic water softeners that are at the end of their service life. 6/1/2009 Replace with energy efficient models the outdated and partially functional domestic ho water heaters that are at the end of their service life. 6/1/2009 Pave or gravel a 3/4 mile walking path in the green space park area of the middle school grounds to improve and increase student and public use. 6/1/2009 Replace 45 year old exterior parking lot safety lights that are at the end of their service life and falling down with energy efficient models. 6/1/2009

q e R

O R

D VE

Replace obsolete computers and technology equipment to improve instruction.

6/1/2009

8/31/2010

$

72,500

Replace obsolete computers and technology equipment to improve instruction.

6/1/2009

9/30/2010

$

72,500

Replace ceiling lights in gymnasium classroom with energy efficient models.

6/1/2009

8/31/2010

$

75,400

Replace ceiling lights in gymnasium classroom with energy efficient models.

6/1/2009

09/31/2010

$

75,400

Replace ceiling lights in two gymnasium classroom with energy efficient models.

6/1/2009

12/31/2009

$

75,400

Replace ceiling lights in gymnasium classroom with energy efficient models.

6/1/2009

10/31/2009

$

87,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

601 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Stockbridge Community Schools Stockbridge Stockbridge Community Schools Stockbridge Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools

Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools

Project Name Stockbridge Community School District, Katz Elementary School Stockbridge Community School District, Stockbridge Middle School

Project Description Renovate toilets at Katz School to allow decreased use of water and improved facilities to students and public. Renovate toilets at the middle school to allow decreased use of water and improved facilities to students and public.

Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Stockbridge High School

Replace outdated and dangerous electrical control panels at the high school. Current panels do not have replacement parts, encourage inefficient electrical distribution and frequently fail. 6/1/2009 Replace two 45 year old heating boilers with energy efficient models to reduce breakdowns and increase energy efficiency. 6/1/2009 Replace 750 hall and classroom room lockers that are 45 years old and at the end of their service life. 6/1/2009

Stockbridge

Stockbridge Community School District, Howlett Elementary School

Replace outdated hot water heating boiler that is at the end of its service life with energy efficient hot water boilers. Replace existing univent heaters and heating lines as needed. 6/1/2009

Stockbridge

PP

O R

Replace outdated steam heating boiler that is at the end of its service life with energy Stockbridge Community School District, Katz efficient hot water boilers. Replace existing steam lines with hot water lines. Convert Elementary School univent heaters from steam to hot water units. 6/1/2009

Stockbridge Stockbridge Stockbridge

Stockbridge Stockbridge Stockbridge Stockbridge

Stockbridge

Stockbridge

Stockbridge

Stockbridge Stockbridge Stockbridge Stockbridge Stockbridge Stockbridge

02262009

S

94,250

6/1/2009

7/31/2010

$

101,500

$

123,500

$

186,325

$

240,000

9/30/2010

$

527,554

09/31/2010

$

826,432

6/1/2009

09/31/2010

$

3,370,869

6/1/2009

09/31/2010

$

42,050

6/1/2009

12/31/2010

$

36,250

6/1/2009

9/30/2010

$

36,250

09/31/2010

$

50,000

09/31/2009

$

79,750

19/30/2010

$

320,450

6/1/2009

7/31/2010

$

398,750

6/1/2009

11/31/2010

$

36,250

Renovate playgrounds to provide safe play equipment and appropriate soft surfaces. 6/1/2009

11/31/2010

$

14,500

Renovate playgrounds to provide safe play equipment and appropriate soft surfaces. Replace outdated instructional equipment and outdated furniture that is at the end of its service life to improve instruction and student safety. Replace outdated instructional equipment and outdated furniture that is at the end of its service life to improve instruction and student safety. Replace 50 year old storage pole barn that is much needed by the district and at the end of its service life. Replace the 60 year old fire alarm panel and wiring to improve occupant safety at the middle school

6/1/2009

9/30/2010

$

14,500

6/1/2009

9/30/2010

$

90,000

6/1/2009

9/30/2010

$

90,000

6/1/2009

12/31/2009

$

174,000

6/1/2009

7/31/2010

$

188,500

Add visual lights to current fire alarm system

6/1/2009

8/30/2009

$

159,500

A T

Stockbridge Community School District, Stockbridge Middle School

m b u

Stockbridge

$

Renovate entrance area and breezway areas of the middle school to improve energy efficiency through heat loss and replace floor and wall surfaces at the end of their service life. 6/1/2009

d e tt

it

Stockbridge

9/30/2010

Replace two outdated steam heating boilers that are at the end of their service life with energy efficient hot water boilers. Replace existing steam lines with hot water lines. Convert univent heaters from steam to hot water units. Renovate toilets at Howlett School to allow decreased use of water and improved facilities to students and public. Construct an entry area at the hall exterior entrance areas to prevent heat loss and cool air loss when the area is entered and exited. Construct an entry area at the hall exterior entrance areas to prevent heat loss and cool air loss when the area is entered and exited.

s

st

e u

q e R

Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Heritage Elementary School Stockbridge Community School District, Smith Elementary School Stockbridge Community School District, Smith Elementary School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge High School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge High School

Funding Request

6/1/2009

Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Howlett Elementary School Stockbridge Community School District, Heritage Elementary School Stockbridge Community School District, Smith Elementary School

Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge High School

Stockbridge

Start Date

Expected Completion Date

O N

Install an irrigation well to provide irrigation for outdoor classroom space at the middle school and to allow better maintainance of the green space park areas at the middle school. 6/1/2009 Replace energy management software and data collection sensors to allow maximun efficiency of heating and cooling systems. 6/1/2009 Replace outdated and dangerous electrical control panels at the middle school. Current panels do not have replacement parts, encourage inefficient electrical distribution and frequently fail. Construct an entry area at the caffeteria and gym entrance to prevent heat loss and cool air loss when the area is entered and exited.

Submitted Requests - Not Approved

9/30/2010 9/30/2010

09/31/2009

D VE

Route (Infrastructure Only)

602 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools

Stockbridge Community Schools Stockbridge Community Schools Stockbridge Community Schools

Stockbridge Community Schools Nottawa Community School Nottawa Community School Vandercook Lake Public Schools Vandercook Lake Public Schools

Vandercook Lake Public Schools

Vandercook Lake Public Schools Jackson Public Schools Vandercook Lake Public Schools Lakewood Public Schools

Swartz Creek Community Schools Swartz Creek Community Schools

Location City or Township

Stockbridge

Project Name Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Heritage Elementary School Stockbridge Community School District, Stockbridge Middle School

Project Description Start Date Renovate a 50 year old storage pole barn that is much needed by the district and at the end of its service life. 6/1/2009 Install 200x80 foot paved parking to reduce traffic congestion at the middle school and improve safety for students and public. 6/1/2009 Install 200x80 foot paved parking to reduce traffic congestion at the elementary schoo and improve safety for students and public. 6/1/2009 Install a handicap elevator at the middle school to allow handical access to the second floor. 6/1/2009

Stockbridge

Stockbridge Community School District, Stockbridge Middle School

Install a new wooden floor in the gymnasium classroom at the middle school to replace the 50 year old wood floor that is at the end of its service life.

Stockbridge

Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Stockbridge Middle School Stockbridge Community School District, Heritage Elementary School

Renovate three middle school science classrooms to allow for current instructional methods to be used including use of electronic equipment. Renovation includes experiment tables, ceilings, storage areas, water and electrical. 6/1/2009 Renovate abandoned boiler room to improve building safety and provide useable space. 6/1/2009 Replace outdated instructional equipment and outdated furniture that is at the end of its service life to improve instruction and student safety. 6/1/2009

Stockbridge

Stockbridge Community School District, Stockbridge High School

Renovate three high school science classrooms to allow for current instructional methods to be used including use of electronic equipment. Renovation includes experiment tables, ceilings, storage areas, water and electrical.

Stockbridge Stockbridge Stockbridge

Stockbridge Stockbridge

Sturgis

T O

s t s

-N

e u

Summit Township Summit Township

Summit Township

Vandercook Lake Public Schools

d e tt

q e R

$

58,000

7/31/2010

$

85,550

$

107,300

$

108,750

$

174,000

9/30/2010

$

391,500

7/31/2010

$

210,250

9/30/2010

$

90,000

6/1/2009

11/31/2010

$

391,500

6/1/2009

8/30/2009

$

100,000

6/1/2009

7/31/2009

$

28,000

4/1/2009

4/1/2009

$

20,000

09/31/2010 7/31/2010

O R

P P A

7/31/2010

D VE

6/15/2009

6/30/2009

$

30,000

Update the network core switch which controls all network functions districtwide. Current switch is over ten years old and obsolete. Replace four network servers replacing obsolete network servers that are no longer warranted, slow, and difficult to repair and find parts. 6/15/2009

6/30/2009

$

70,000

8/15/2009

$

180,000

Summit Township

Vandercook Lake Public Schools

Construction of bus barn and mechanical workshop area for district transportation and maintenance fleet. Current facility does not allow to make ncessary repairs due to space constraints. Shovel ready - arechitectural plans and drawings available upon approval. 7/1/2009

Summit Township

JPS Dibble Elementary

Replace classroom lighting

t i m

Funding Request

7/31/2010

6/1/2009

Nottawa Community School Roof Replace Nottawa Community School roof and add insulation. Nottawa Community School Upgrade Internet capability in building Purchase new server and go wireless. Purchase grounds maintenance equipment to help preserve district facilities as well Vandercook Lake Public Schools as maintaining area parks and fields for local recreational areas. Replace computers and monitors in the high school and middle school laboratories Vandercook Lake High School that are outdated.

Sturgis

Expected Completion Date

12/31/2009

$

53,560

Vandercook Lake Public Schools

Resurfacing parking lots and demolition of old tennis courts that have been tagged as unsafe by insurance agent. There are numerous cracks and crevices in that area causing potential injury and harm on school grounds. 6/15/2009

7/1/2009

$

35,000

Lakewood Sunfield Elem

Addition & renovations to Sunfield Elementary

12/31/2009

$

3,572,000

Swartx Creek

Swartz Creek Community Schools

Erecting, furnishing and equipping additions to and remodeling, refurnishing and requipping school district buildings, erecting, furnishing and equipping a new high schoo building; acquiring and installing educational technology improvements; acquiring real property for site purposes; and developing and improving outdoor physical education facilities, playgrounds and sites. 6/1/2009

8/15/2012

$

79,070,000

Swartz Creek

Swartz Creek Community Schools

Replacing Windows at Mary Crapo

9/1/2009

$

75,000

ub

Summit Township Sunfield

02262009

S

Submitted Requests - Not Approved

7/1/2009

6/1/2009

6/1/2009

Route (Infrastructure Only)

603 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Swartz Creek Community Schools Swartz Creek Swartz Creek Community Schools Swartz Creek Swartz Creek Community Schools Swartz Creek

Taylor School District

Tecumseh Public Schools Tekonsha Community Schools Swan Valley School District Swan Valley School District Swan Valley School District Swan Valley School District

Taylor

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Swartz Creek Community Schools

Replacing boilers at the high school.

6/1/2009

9/1/2009

$

1,500,000

Swartz Creek Community Schools

Adding Energy Management System Districtwide

6/1/2009

9/1/2009

$

4,000,000

Swartz Creek Community Schools

Replacing boilers at Mary Crapo

6/1/2009

9/1/2009

$

2,000,000

Taylor Community Schools

Remodeling, equipping, re-equipping, furnishing and refurnishing elementary, middle school and high school buildings, other facilities and playgrounds; preparing, developing and improving school building sites, other facility sites, and playground sites; erecting and completing elevator tower additions at the Brake Middle School and the Kennedy High School and site preparation for the additions; acquiring, installing, equipping and re-equipping school buildings and other facilities, for technology systems and equipment; and acquiring school buses. The maximum number of years the bonds may be outstanding, exclusive of refunding, is not more than twenty-five (25) years; the estimated millage that will be levied to pay the proposed bonds in the first year is 3.00 mills (which is equal to $3.00 per $1,000 of taxable value); and the estimated simple average millage that will be required to retire the bonds over twenty-five (25) years is 2.33 mills annually ($2.33 per $1,000 of taxable value). 6/1/2009

$

70,500,000

$

36,730,000

T O

O R

D VE

P P A

N s

8/15/2011

Tecumseh

Tecumseh Public Schools

Tekonsha

Tekonsha

remodeling school district buildings, excepting the high school; erecting an addition at Tecumseh Acres; acquiring and installing instructional technology improvements district-wide and developing and improving sites. Erecting additions to the high school remodeling and partially re-equipping the high school and middle school; developing and improving sites, athletic fields and facilitis and playgrounds. Replace all toilets and urinals in both the Elementary and Jr/Sr High school buildings with water efficient systems. 6/6/2009

Thomas Township

Swan Valley-High School

Districtwide energy improvements including boiler

6/1/2009

11/1/2009

$

820,000

Thomas Township

Swan Valley-High School

Technology equipment for district classrooms

6/1/2009

9/1/2009

$

665,000

Thomas Township

Swan Valley-Havens Elem.

cameras and "smart" boards

6/1/2009

9/1/2009

Thomas Township

Swan Valley-Middle School

including computers, LCD projectors, document

6/1/2009

9/1/2009

$

16,690,000

River Valley School District

Three Oaks

Leslie Public Schools

Township of Leslie

Leslie Public Schools Traverse City Area Public Schools

Township of Leslie

eq

R d

e t tt

i m

River Valley School District

ub

st

e u

8/27/2009

$

180,000

erecting, furnishing and equipping a new elementary school; developing and equipping playgrounds and an athletic field; erecting, furnishing and equipping an addition to and partially remodeling, furnishing and refurnishing, and equipping and re-equipping the middle/high school; acquiring and installing education technology; and developing and improving sites.

Leslie Public Schools Leslie High School

Energy Efficiency Upgrades - gym light replacement at High School

3/30/2009

4/30/2009

$

4,500

Leslie Public Schools Leslie High School

6/14/2009

7/1/2009

$

10,000

Traverse City Area Public Schools

Major Ashpalt Repair at Leslie High School Improve teacher curriculum resources by installing classroom laptops and projector systems.

4/1/2009

7/1/2010

$

3,000,000

Traverse Bay Area ISD Traverse City

Traverse Bay Area ISD

Server consolidation, network infrastructure upgrades, security system

7/1/2009

1/1/2010

$

1,275,000

Traverse City Area Public Schools

Traverse City Area Public Schools - East Middle School, West Middle School, Central High School, West High School

Complete design and installation for four secondary schools security and technology systems. 8/1/2009

8/1/2010

$

1,500,000

S

Traverse City

Traverse City

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

604 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Traverse City Area Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

Reconstruction project to develop a LEED certified elementary school inclusive of Green and energy efficient initiatives. Reconstruction provides opportunity for shared services between public school system and Local and State entities to provide a true community learning center. Reconstruction shall include technology packages to support student curriculum. 8/1/2009

Traverse City

Traverse City Area Public Schools Montessori

Traverse City

Traverse City Area Public Schools - Central High School, Traverse City High School, West High School, East Middle School, West Middle School, Blair Elementary, Courtade Upgrades to mechanical systems to include improved green technology, improving Elementary, Silver Lake Elementary, indoor air quality for students and centralized control packages for energy Westwoods Elementary efficiencies.

D VE $

8,500,000

8/1/2010

$

9,000,000

Trenton Public Schools Trenton

Trenton Public Schools - Arthurs Middle School

Building improvements to include remodeling of media center (floors, ceilings, fixtures and lighting); remodel forum area (floors, ceilings, fixtures and lighting); install new lockers; install dry erase boards and replace Gymnasium bleachers. (Floors to be replaced with green products that reduce life cycle costs of labor and chemical application & lighting to be replaced for more energy efficiency) 7/22/2009

10/22/2009

$

504,720

Trenton Public Schools Trenton

Remodel of Auditorium area restrooms including replacement of floors with green products that reduce life cycle costs, lighting upgrade from indcandescent lights to high-pressure sodium and replace sinks with low floww sensor faucets, original toilets Trenton Public Schools - Trenton High School with dual flush toilets 7/22/2009

10/22/2009

$

31,680

Trenton Public Schools Trenton

Remodel of Central Administration area, including replacement of floors with green products that reduce life cycle costs, lighting upgrade from indcandescent lights to Trenton Public Schools - Trenton High School high-pressure sodium

7/22/2009

10/22/2009

$

102,000

7/22/2009

12/1/2009

$

120,000

Traverse City Area Public Schools

T O

s t s

O R

P P A

-N

e u

Trenton Public Schools Trenton

8/1/2010

Funding Request

8/1/2009

Trenton Public Schools Trenton

Trenton Public Schools - Trenton High School Demolition of East classroom area, lowering energy consumption Site development plan providing a safer parent loop, provide additional parking and Trenton Public Schools - Trenton High School improved and more energy efficient lighting (LED)

7/22/2009

10/22/2009

$

600,000

Trenton Public Schools Trenton

Remodeling to cover conversion of Media Center to classrooms; remodeling of Auto Lab, Wood Shop, Kitchen/Serving area, Art Rooms and CAD Lab, including replacement of floors with green products that reduce life cycle costs, lighting upgrade from indcandescent lights to high-pressure sodium and replace sinks with low flow 7/22/2009 Trenton Public Schools - Trenton High School sensor faucets, original toilets with dual flush toilets

10/22/2009

$

1,884,000

Trenton Public Schools Trenton

d e t

q e R

Trenton Public Schools - Hedke Elementary Trenton Public Schools - Anderson Elementary

Site development for parking, circulation and improvements 7/22/2009 Convert Media Center to classrooms; install new lockers; replace interior doors; install dry erase boards; upgrade classroom cabinetry and millwork 7/22/2009

10/22/2009

$

438,000

10/22/2009

$

638,940

Remodeling to cover conversion of Media Center to classrooms; demolish exterior covered walkways; install new lockers; replace interior doors; install dry erase boards; upgrade classroom cabinetry and millwork 7/22/2009

10/22/2009

$

750,720

Conversion of Metal Shop to Robotics Lab

7/22/2009

10/22/2009

$

144,000

Site development for parking, circulation and safety improvements

7/22/2009

10/22/2009

$

438,000

Site development for parking, circulation and improvements

7/22/2009

10/22/2009

$

960,000

Trenton Public Schools Trenton

Trenton Public Schools - Trenton High School Trenton Public Schools - Anderson Elementary Trenton Public Schools - Arthurs Middle School Trenton Public Schools - Anderson Elementary

New Media Center/Cafeteria Addition

7/22/2009

12/31/2009

$

2,160,000

Trenton Public Schools Trenton

Trenton Public Schools - Hedke Elementary

New Media Center/Cafeteria Addition

7/22/2009

12/31/2009

$

2,160,000

itt

Trenton Public Schools Trenton

Trenton Public Schools Trenton Trenton Public Schools Trenton Trenton Public Schools Trenton Trenton Public Schools Trenton

02262009

bm

Trenton Public Schools - Hedke Elementary

u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

605 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Description Construction of Media Center, relocation of Main Office, creating a secure entrance Trenton Public Schools - Trenton High School and expansion of Commons Area

7/22/2009

12/31/2009

$

2,880,000

Avondale/Woodland

RTU w/heat recovery replacement

6/9/2009

8/9/2009

$

153,113

Avondale/Woodland

Door/Window replacement/repair

6/9/2009

8/9/2009

$

190,437

Ubly

Ubly Community

The voters of the Ubly Community School passed a bond proposal in August of 2008 for the purpose of upgrading technology and making improvements to our building to make it more energy efficient. These projects will be scheduled for the summer of 2009. Included in this project are several upgrades to save energy costs to our district. Our project includes replacing old windows with energy efficient windows. We are replacing interior lighting with energy efficient lighting with motion sensors to shut down when not in use. We will be replacing old boilers with new electrical wiring and electrical panels in our 1936 building, which will make us more energy efficient. We will be upgrading our exterior lighting to energy efficient lighting to make our parking lots secure for visitors. Computer upgrades will be made in our computer labs to provide equipment that is current with the technological needs of the day. 6/1/2009

9/1/2009

$

2,020,000

Union City

Union City Schools

Retrofit all lighting in the middle school.

6/15/2009

8/15/2009

$

75,000

Union City

Union City Schools

Repair of existing roof to address areas which are leaking.

6/15/2009

8/15/2009

$

80,000

Union City

Union City Schools

Installation of new, more energy efficient HVAC units in every classroom.

7/1/2009

8/31/2009

$

150,000

Union City

Union City Schools

Installation of new, more energy efficient HVAC units in every classroom.

7/1/2009

8/31/2009

$

160,000

Union City

Union City Schools

8/15/2009

$

250,000

Union City

Union City Schools

Remove all underground/buried plumbing and move overhead. 6/15/2009 Replacement of HS Boiler system with more energy efficient heating system (including re-plumbing) 7/1/2009

8/31/2009

$

250,000

Union City

Union City Schools

Build a more energy efficient bus garage and staging area.

6/15/2009

8/15/2009

$

350,000

Union City

Union City Schools

Reconstruction of existing parking lot at the High school

Trenton Public Schools Trenton Avondale School District Troy Avondale School District Troy

Ubly Community Schools Union City Community Schools Union City Community Schools Union City Community Schools Union City Community Schools Union City Community Schools Union City Community Schools Union City Community Schools Union City Community Schools

Union City Community Schools Union City

Project Name

d e tt

it

m b u

Vassar Public Schools vassar

Vassar Public schools/district wide Vassar Public Schools/ Townsend north elementary

Vassar Public Schools vassar

S

q e R

O R

P P A

-N

e u

Union City Schools Vassar Public Schools/ Townsend north elementary

Vassar Public Schools vassar

s t s

T O

Start Date

Expected Completion Date

Funding Request

D VE

6/15/2009

7/15/2009

$

135,000

Construction of parking area to include a safe drop off and pick up area for students. This would also include the reorganization of parking for the building. Two different drop off loops will be created. 6/15/2009

7/15/2009

$

290,000

update 1950 electrial system.

6/1/2009

8/1/2009

$

8,500

Replacing t-12 lights and ballasts with energy efficient t-8's and t-5's lighting.

6/1/2009

8/1/2009

$

112,000

Replace 1950's style single pain windows with energy efficient thermal windows

6/1/2009

8/1/2009

$

200,000

6/1/2010

$

1,500,000

Vassar Public Schools vassar

Vassar Public Schools/ new construction

a new a Community Facilities building. This Building will be a "Green" Facility that will allow the district to offset its current crowed conditions while offering opportunities to community groups and organizations. The building will be a 10000 sq. ft. facility containing physical fitness equipment, running/walking track, turf room, a fine arts room, and storage for district. 6/1/2009

Lowell Area Schools

Vergennes Twp.

Lowell-High School

Replace Chiller System.

6/1/2010

8/30/2010

$

400,000

Lowell Area Schools

Vergennes Twp.

Lowell-High School

Replace mechanical controls.

6/1/2010

8/30/2010

$

60,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

606 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Lowell Area Schools

Vergennes Twp.

Lowell-High School

Replace roof.

6/1/2010

8/30/2010

$

1,000,000

Lowell Area Schools

Vergennes Twp.

Lowell-High School

6/1/2010

8/30/2010

$

35,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Maplewood Elem

6/1/2009

10/1/2009

$

670,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Jr/Sr High

Replace outdated and inoperable clock and bell system. Boiler replacement, replacement of outdated Classroom Heat & Ventilating, Update Energy Management System, Window Replacement Boiler replacement, replacement of outdated Classroom Heat & Ventilating, Update Energy Management System

6/1/2009

10/1/2009

$

1,300,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Maplewood Elem

Security Improvments, Remodel Entrance

6/1/2009

$

75,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Jr/Sr High

Parking Lot repair/replacement

6/1/2009

$

100,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Jr/Sr High

6/1/2009

10/1/2009

$

110,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Jr/Sr High

6/1/2009

8/1/2009

$

150,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Jr/Sr High

6/1/2009

2010

$

275,000

Maple Valley Schools

Vermontville

Maple Valley Schools, Jr/Sr High

Replace Gym Floor Locker Replacement, Door Replacement, Flooring Replacement, Bleacher Replacement Security Improvments, Remodel Entrances, Security Cameras, Exterior Lighting, Communication System Educational Upgrades, Classroom remodel, Technology Equipment, Science Equipment

PP

8/1/2009

6/1/2009

2010

$

1,500,000

Vestaburg Community Schools

Erecting, furnishing and equipping and remodeling; refurnishing and re-equipping the high school and middle/elementary school buildings; acquiring and installing educational technology improvements; and erecting, equipping, developing and improving playgrounds, play fields, athletic fields, athletic facilities and the site.

$

9,180,000

Vicksburg Community Schools Boiler and HVAC Replacements

Project will replace boilers and HVAC equipment at Indian Lake Elementary, Sunset Lake Elementary, and Vicksburg Administration Building. Replacement equipment wil result in improved energy efficiency and project is necessary to maintain safe and comfortable environments for students and staff. 7/1/2009

9/1/2009

$

150,000

Project will install one passenger elevator in the Vicksburg Administration Building. The building was constructed in 1908 and the original design did not incorporate an elevator. Today, the building houses the Districts adult and community education programs, and is used by many community members. Building is not safely accessible for elderly and disabled individuals, and this project would create safe access for all members of the community, regardless of disability.

Vestaburg Community Schools Vestaburg

Vicksburg Community Schools Vicksburg

Vicksburg Administration Building Elevator Installation

u q e

e t tt

7/1/2009

9/1/2009

$

400,000

9/1/2009

$

120,000

Vicksburg School building roof replacements

Project will replace roof sections at all school buildings. Roofs have been properly maintained, but certain sections have exceeded their useful lives and must be replaced in order to maintain a safe and effective learning environment for our students.

7/1/2009

9/1/2009

$

135,000

Vicksburg School building flooring replacements

Project will replace sections of flooring at all school buildings. Floors have been properly maintained, but certain sections have exceeded their useful lives and must be replaced in order to maintain a safe and effective learning environment for our students. 7/1/2009

9/1/2009

$

255,000

Reconstruction of entry and exit for Vicksburg Middle School. Drive improvements wil more effectively separate school bus, pedestrian, and commuter traffic. Project will Vicksburg Middle School Drive Improvements greatly reduce traffic congestion and improve safety of students, staff, and public. 7/1/2009

9/1/2009

$

450,000

Vicksburg High School Parking Lot Renovations

ub

Vicksburg Community Schools Vicksburg

02262009

t s e

Project will replace the Eastern parking lot at Vicksburg High School. This parking lot has been properly maintained, but has exceeded its useful life and must be replaced in order to maintain a safe parking and walking area for students, staff, and members of the community. 7/1/2009

i m

Vicksburg Community Schools Vicksburg

Vicksburg Community Schools Vicksburg

s

O N

R d

Vicksburg Community Schools Vicksburg

Vicksburg Community Schools Vicksburg

A T

S

O R 2010

D VE

Submitted Requests - Not Approved

Route (Infrastructure Only)

607 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

District

Project will upgrade and replace existing district technology, including telecommunications systems, network infrastructure, and classroom and lab hardware. This project will also expand technology to many classrooms where it is not currently provided. These upgrades will directly improve the effectiveness of instructional services to students. 7/1/2009 Renovate Maintenance Building. Add insulated wall to cut energy costs and upgrade electric to do the same. 4/1/2009

Bloomingdale Public School District

Village of Bloomingdale/Lee Township

District

Doors. Replace outside doors for security and energy efficiency

Bloomingdale Public School District

Village of Bloomingdale/Lee Township

District

Redo all roofs at the four school buildings.

Bloomingdale Public School District

Village of Bloomingdale/Lee Township

Pullman Elementary

New special education classroom to provide Response to Intervention (RTI) instruction.

Bloomingdale Public School District

Village of Bloomingdale/Lee Township

Bloomingdale Elementary

New classroom at Bloomingdale Elementary needed for increased enrollment.

Bloomingdale Public School District

Village of Bloomingdale/Lee Township

High School

Computer/Technology Lab. Increase the space available for advanced technology.

Bloomingdale Public School District

Village of Bloomingdale/Lee Township

District

All sidewalks redone to meet ADA compliance

Wakefield-Marenisco School District

Wakefield

Wakefield-Marenisco School Distrit

To replace existing roof with an energy efficient roof. To replace three entrance doors that are more energy efficient. May/June 2009

Waldron Area Schools Waldron

Waldron School District

Replace original boilers at the HS with two energy efficient steam boilers

Waldron Area Schools Waldron

Waldron School District

Waldron Area Schools Waldron

Waldron School District

Waldron Area Schools Waldron

Waldron School District

Waldron Area Schools Waldron

Waldron School District

Waldron Area Schools Waldron

Waldron School District

Vicksburg Community Schools Vicksburg Bloomingdale Public School District Village of Bloomingdale

S

Walled Lake Consolidated Schools Walled Lake Fitzgerald Public Schools Warren Fitzgerald Public Schools Warren

02262009

tt i m

d e t

ub

Walled Lake Consolidated Schools Walled Lake Walled Lake Consolidated Schools Walled Lake

Vicksburg Community Schools technology upgrades

D VE $

950,000

$

22,000

$

110,000

8/31/2009

$

100,000

7/1/2009

8/31/2009

$

175,000

7/1/2009

8/31/2009

$

200,000

7/1/2009

8/31/2009

$

275,000

5/1/2009

7/30/2009

$

29,500

July/August 2009

$

285,000

$

90,000

$

35,000

$

15,000

Replace lockers in the High School and Middle School

$

30,000

Replace the High School gym floor.

$

80,000

s t s

O R

P P A

-N

e u

q e R

5/31/2009

4/15/2009

6/15/2009

T O

9/1/2009

Funding Request

6/30/2009

Addition of protected entryway for the High School and Elementary entrance. This will reduce heat loss and increase the safety of our visitors. Repaving of the school parking lot, clearly marking handicap parking and speed limits to increase safety for our students and parents. Replace existing pavement on the elementary playground, eliminating broken areas that could cause injury to students.

Walled Lake - Walled Lake El

Replace deteriorated boilers

6/1/2009

8/31/2009

$

10,000

Walled Lake - Maple El

Replace deteriorated asbestos floor tile in cafeteria

6/1/2009

8/31/2009

$

50,000

Walled Lake - ESC Bldg

Upgrade electrical distribution system for code compliance 5/1/2009 Replace boiler, domestic hot water heater, pumps, piping and controls with up-to-date energy efficient systems/equipment. 5/1/2009 Replace boiler, domestic hot water heater, pumps, piping and controls with up-to-date energy efficient systems/equipment. 5/1/2009

8/31/2009

$

250,000

7/31/2010

$

250,000

7/31/2010

$

250,000

Fitzgerald - Mound Park Elementary Fitzgerald - Schofield Elementary

Submitted Requests - Not Approved

Route (Infrastructure Only)

608 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Fitzgerald Public Schools Warren Fitzgerald Public Schools Warren Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools

Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools

Fitzgerald Public Schools

Fitzgerald Public Schools

Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools

Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools

Project Name Fitzgerald - Chatterton Middle School

Project Description Replace boilers, domestic hot water heaters, pumps, piping and controls with up-todate, energy efficient systems/equipment.

5/1/2009

7/31/2010

$

350,000

Fitzgerald - Fitzgerald High School

Update boiler room pumps, piping and controls to improve energy efficiency.

5/1/2009

10/31/2009

$

750,000

Warren

Fitzgerald - Bus Garage & Transp. Building

Upgrade electrical systems and infrastructure to include more efficient lighting and controls to meet new energy requirements, and replacement of antiquated electrical distribution panels.

7/1/2009

2/15/2010

$

50,000

Warren

Fitzgerald - Bus Garage & Transp. Building

$

200,000

7/31/2010

$

250,000

Upgrade mechanical systems infrastructure to include HVAC systems, direct digital controls, energy management controls, and plumbing fixtures/infrastructure. Replace boilers, domestic hot water heaters, pumps, piping and controls with up-toFitzgerald - Neigebaur Alternative Ed. Building date, energy efficient systems/equipment.

Warren

Start Date

Expected Completion Date

O R

7/1/2009 7/1/2009

P P A

2/15/2010

Funding Request

D VE

Fitzgerald - Mound Park Elementary

Upgrade electrical systems and infrastructure to include more efficient lighting and controls to meet new energy requirements, replacement of antiquated electrical distribution panels, and additional outlets in all classrooms.

7/1/2009

7/31/2010

$

275,000

Fitzgerald - Mound Park Elementary

Upgrade remaining mechanical systems infrastructure to include HVAC systems, direct digital controls, energy management controls, and plumbing fixtures/infrastructure.

7/1/2009

8/15/2010

$

350,000

Fitzgerald - Schofield Elementary

Upgrade remaining mechanical systems infrastructure to include HVAC systems, direct digital controls, energy management controls, and plumbing fixtures/infrastructure.

7/1/2009

8/15/2010

$

350,000

Warren

Fitzgerald - Chatterton Middle School

Upgrade electrical systems and infrastructure to include more efficient lighting and controls to meet new energy requirements, replacement of antiquated electrical distribution panels, and additional outlets in all classrooms.

7/1/2009

7/31/2010

$

450,000

Warren

Upgrade electrical systems and infrastructure to include more efficient lighting and controls to meet new energy requirements, replacement of antiquated electrical Fitzgerald - Neigebaur Alternative Ed. Building distribution panels, and additional outlets in all classrooms.

7/1/2009

7/31/2010

$

750,000

Warren

Fitzgerald - Fitzgerald High School

Upgrade electrical systems and infrastructure to include more efficient lighting and controls to meet new energy requirements, replacement of antiquated electrical distribution panels, and additional outlets in all classrooms.

7/1/2009

7/31/2010

$

1,650,000

Warren

Upgrade mechanical systems infrastructure to include HVAC systems, A/C in all classrooms, direct digital controls, energy management controls, and plumbing Fitzgerald - Neigebaur Alternative Ed. Building fixtures/infrastructure.

7/1/2009

10/31/2010

$

2,500,000

7/1/2009

10/31/2010

$

8,500,000

Classroom HVAC Replacement - Replace 1969 classroom unit ventillators with more efficient Change Aire VUV's. Scope would include removal and replacement of existing ceiling to accommodate new ductwork, and HVAC controls. 6/17/2009

8/28/2009

$

2,000,000

Replace Two Skylights

6/17/2009

7/5/2009

$

20,000

Replace Parking Lot and Tennis Court Lighting with LED

6/17/2009

7/3/2009

$

35,000

Exterior Door Replacement

6/17/2009

7/3/2009

$

50,000

Replace Existing Boilers and Pumps

6/17/2009

8/28/2009

$

180,000

Install 2nd Floor Windows in Classrooms to promote daylighting

6/17/2009

8/28/2009

$

200,000

Warren

Warren

Warren

itt

Warren Warren Warren

02262009

d e t

q e R

Fitzgerald - Fitzgerald High School

m b u

Warren

Warren

s t s

-N

e u

Warren

Warren

T O

S

Warren Woods Public Schools - Pinewood Elementary Warren Woods Public Schools - Enterprise High School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Pinewood Elementary Warren Woods Public Schools - Tower High School

Upgrade mechanical systems infrastructure to include HVAC systems, A/C in all classrooms, direct digital controls, energy management controls, and plumbing fixtures/infrastructure.

Submitted Requests - Not Approved

Route (Infrastructure Only)

609 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Warren Woods Public Schools Warren Warren Woods Public Schools Warren Warren Woods Public Schools Warren

Project Name Warren Woods Public Schools - Education Center Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Education Center

Center Line Public Schools

Warren

School Improvement. This project will assist in transforming instruction in all classroom by installing projectors and document cameras in each classroom. The equipment in conjunction with training that the district will provide, will help teachers to greatly expand the tools and opportunities for each student. The overall goal is to Center Line Public Schools Peck Elementary reduce a reliance on paper for worksheets 5/1/2009

Warren

School Improvement. This project will assist in transforming instruction in all classroom by installing projectors and document cameras in each classroom. The equipment in conjunction with training that the district will provide, will help teachers to greatly expand the tools and opportunities for each student. The overall goal is to Center Line Public Schools Roose Elementary reduce a reliance on paper for worksheets 5/1/2009

Warren

Fitzgerald - Mound Park Elementary

Warren

Fitzgerald - Neigebaur Alternative Ed. Building Update elevator.

Warren

Fitzgerald - Chatterton Middle School

Warren

Center Line Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools

Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools

Project Description

Start Date

Expected Completion Date

Funding Request

Replace All Existing HVAC Systems

6/17/2009

8/28/2009

$

1,000,000

Replace All Original HVAC Air Handlers

6/17/2009

8/28/2009

$

1,000,000

Replace All Exterior Doors and Windows

6/17/2009

8/28/2009

$

1,500,000

P P A

6/30/2009

$

35,700

6/30/2009

$

48,300

5/1/2009

3/31/2010

$

75,000

5/1/2009

3/31/2010

$

75,000

Install baseball and softball bleacher units on cement pads.

5/1/2009

8/15/2010

$

100,000

Fitzgerald - Fitzgerald High School

Install new sanitary sewer line from Field House to Eureka Street

5/1/2009

9/15/2009

$

100,000

Warren

Fitzgerald - Fitzgerald High School

5/1/2009

9/15/2009

$

150,000

Warren

Fitzgerald - Fitzgerald High School

5/1/2009

11/30/2010

$

200,000

Warren

Fitzgerald - Chatterton Middle School

Update and renovate video production and recording studios and classrooms. Provide fire rated storage areas for important document storage required under record retention guidelines. Construct additional parking area(s) to accommodate off-street parking at athletic events.

5/1/2009

11/15/2009

$

275,000

Warren

Fitzgerald - Bus Garage & Transp. Building

Replace bus compound asphalt and cement.

5/1/2009

11/15/2009

$

400,000

Warren

Fitzgerald - Chatterton Middle School

Upgrade locker rooms to include flooring, lockers, ceilings and fixtures

5/1/2009

8/15/2010

$

400,000

Warren

Fitzgerald - Fitzgerald High School

8/15/2010

$

1,200,000

Warren

Fitzgerald - Bus Garage & Transp. Building

Upgrade locker rooms to include flooring, lockers, ceilings and fixtures 5/1/2009 Renovate interior spaces to include floors, interior doors and hardware, toilet rooms, etc. 7/1/2009

3/31/2010

$

125,000

Upgrade electrical systems and infrastructure to include more efficient lighting and controls to meet new energy requirements, replacement of antiquated electrical distribution panels, and additional outlets in all classrooms.

7/1/2009

7/31/2010

$

275,000

Replace all student lockers. Renovate toilet rooms throughout building including four gang toilet rooms and four unisex toilet rooms.

7/1/2009

10/1/2009

$

300,000

7/1/2009

9/1/2009

$

400,000

Update auditorium flooring, stage, seating, acoustics, lighting and sound systems. Renovate interior spaces to include floors, ceilings, walls, doors, frames, hardware Fitzgerald - Neigebaur Alternative Ed. Building and ADA compatible room signage. Renovate interior spaces to include floors, ceilings, walls, doors, frames, hardware Fitzgerald - Mound Park Elementary and ADA compatible room signage.

7/1/2009

8/15/2010

$

550,000

7/1/2009

5/31/2010

$

1,000,000

7/1/2009

7/31/2010

$

1,200,000

m b u

Warren Warren Warren Warren Warren Warren

02262009

Fitzgerald - Schofield Elementary

S

s t s

-N

e u

eq

R d

e t t

it

T O

Update elevator.

Fitzgerald - Chatterton Middle School Fitzgerald - Chatterton Middle School Fitzgerald - Fitzgerald High School

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

D VE

610 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Fitzgerald Public Schools Warren Fitzgerald Public Schools Warren Fitzgerald Public Schools Warren Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools Fitzgerald Public Schools

Fitzgerald Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools

Project Name

Start Date

Expected Completion Date

Fitzgerald - Schofield Elementary

Project Description Renovate interior spaces to include floors, ceilings, walls, doors, frames, hardware and ADA compatible room signage.

Funding Request

7/1/2009

7/31/2010

$

1,200,000

Fitzgerald - Mound Park Elementary

Construct cafeteria/multi-purpose room/stage addition.

7/1/2009

8/15/2010

$

1,250,000

Fitzgerald - Schofield Elementary

Construct cafeteria/multi-purpose room/stage addition.

7/1/2009

8/15/2010

$

1,250,000

$

1,250,000

$

1,650,000

5/31/2010

$

2,400,000

D VE

Warren

Fitzgerald Public Schools - District-Wide

Warren

Fitzgerald - Chatterton Middle School

Warren

Fitzgerald - Fitzgerald High School

Evaluate and repair/replace exterior wall envelope components to include brick, stone mortar, door and window sealants to improve building envelope energy efficiency. 7/1/2009 Renovate interior spaces to include floors, ceilings, walls, doors, frames, hardware and ADA compatible room signage. 7/1/2009 Renovate interior spaces to include floors, ceilings, walls, doors, frames, hardware and ADA compatible room signage. 7/1/2009

Warren

Fitzgerald Public Schools - District-Wide

Replace all aging asphalt and cement surfaces at all district buildings.

7/1/2009

8/31/2010

$

2,650,000

Warren

Fitzgerald - Chatterton Middle School

8/15/2010

$

2,850,000

Warren

Fitzgerald Public Schools - District-Wide

Construct auxilliary gymnasium and locker room addition. 7/1/2009 Replace older roof systems to provide better insulation and enhance building envelope energy efficiency 7/1/2009

8/31/2010

$

3,500,000

Upgrade district-wide technology systems to include Equipment Replacement (Network Servers, Network Electronics (Wired/Wireless/VoIP), Projectors, Document Cameras, Media Players, Computers), Telecommunications—local and long distance telephone services, email, web hosting and cellular services except high speed Internet access services provided by Macomb Intermediate School District. Also Electrical Construction and Asbestos Abatement to support installation of mounted projectors. 7/1/2009

8/15/2010

$

5,500,000

Replace Café Flooring

6/17/2009

7/17/2009

$

25,000

Replace Classroom Sinks

6/17/2009

7/10/2009

$

25,000

Replace/Refurbish Front Entrance Canopy

6/17/2009

7/24/2009

$

40,000

Replace Hard Tile in Corridor

6/17/2009

7/31/2009

$

45,000

Replace Gym Flooring

6/17/2009

7/3/2009

$

48,000

Loading Dock at Receiving

6/17/2009

8/28/2009

$

50,000

Install Hallway Lockers

7/6/2009

7/24/2009

$

75,000

Replace Classroom Flooring

6/17/2009

8/28/2009

$

75,000

Replace Building Front Entrance Canopy

6/17/2009

7/30/2009

$

80,000

Replace Gym Bleachers

7/6/2009

7/24/2009

$

80,000

Replace Gym Bleachers

7/13/2009

7/31/2009

$

80,000

Replace 2nd Floor Lockers

6/17/2009

8/28/2009

$

85,000

Replace Running Track

6/17/2009

8/28/2009

$

120,000

Replace Asphalt Path Around Building with Concrete Sidewalks

6/17/2009

7/24/2009

$

125,000

Warren Warren Warren Warren Warren Warren

Warren

ub

Warren Warren Warren Warren Warren Warren Warren

02262009

Fitzgerald Public Schools - District-Wide Warren Woods Public Schools - Briarwood Elementary Warren Woods Public Schools - Westwood Elementary Warren Woods Public Schools - Westwood Elementary Warren Woods Public Schools - Briarwood Elementary Warren Woods Public Schools - Pinewood Elementary Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Westwood Elementary Warren Woods Public Schools - Briarwood Elementary Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Education Center Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Westwood Elementary

tt i m

Warren

S

T O

d e t

st

e u

q e R

Submitted Requests - Not Approved

O R

P P A

N s

8/31/2010

7/31/2010

Route (Infrastructure Only)

611 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools

Center Line Public Schools

Waterford School District

Waterford School District

Waterford School District

Location City or Township Warren Warren Warren Warren Warren

Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren

Waterford

02262009

$

135,000

Replace Auditorium Seating & Carpet

6/17/2009

8/28/2009

$

150,000

Remodel All Gang Toilet Rooms

6/17/2008

8/28/2008

$

200,000

Replace Carpet in Classrooms and Offices

6/17/2009

8/28/2009

$

225,000

Replace Parking Lot and Parking Lot Lighting

6/17/2009

$

230,000

Remodel Kitchen Including New Equipment, Hoods and Walk-In

7/20/2009

$

250,000

Replace All Original Ceilings

PP

8/28/2009

6/17/2009

8/28/2009

$

250,000

6/17/2009

8/28/2009

$

250,000

6/17/2009

8/28/2009

$

250,000

6/17/2009

8/28/2009

$

300,000

Install Fire Sprinkler System (So Preschool can use gym)

6/17/2009

8/28/2009

$

350,000

Remodel Kitchen Including New Equipment, Hoods and Walk-In

6/17/2009

8/28/2009

$

350,000

6/17/2009

8/28/2009

$

500,000

6/17/2009

8/28/2009

$

558,000

Replace Grass Football Field With Artificial Turf

6/17/2009

8/28/2009

$

750,000

Replace All Corridor Flooring with Terrazo Flooring

6/17/2009

8/28/2009

$

2,300,000

School Improvement. This project will assist in transforming instruction in all classroom by installing projectors and document cameras in each classroom. The equipment in conjunction with training that the district will provide, will help teachers to greatly expand the tools and opportunities for each student. The overall goal is to reduce a reliance on paper for worksheets 5/1/2009

6/30/2009

$

33,600

We need to replace our outdated and underperforming firewall which would include th servers to handle the load. Our current firewall is rated to handle a network maximum of 2500 computers. We are now approaching 4000. May,2009

September, 2009

$

70,000

Waterford

With a fiber network backbone, we will make secondary buildings wireless. This would include access points, power over Ethernet injectors, and labor to create a wireless network in each of our 26 buildings.

May,2009

May, 2010

$

100,000

Waterford

We would like to upgrade video production equipment in all of the elementary and secondary buildings. This would include NewTek Tricaster Live Production Studio, digital video camera and tripod , DVD recorders, audio mixer, head phones, cables and connectors. The equipment will allow buildings to produce professional quality student news broadcast , building events and educational videos. This will keep the equipment uniform throughout the district and replace technology that is more than 12 years old. May,2009

May, 2010

$

150,000

Waterford

S

Funding Request

7/17/2009

A T

Replace Auditorim Seating & Carpet Replace/Enlarge Kitchen

O N

Build Football Stadium Team Room/Toilet/Concession Stand

st

Replace West Parking Lot

e u

Replace Interior Doors

eq

s

R d

e t t

it

m b u

Waterford

Start Date 6/17/2009

Center Line Public Schools Crothers Elementary

Warren

Project Description Replace Interior Doors

Warren Woods Public Schools - Bus Garage Warren Woods Public Schools - Education Center Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Enterprise High School Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Education Center Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Tower High School

Warren

Waterford

Project Name Warren Woods Public Schools - Briarwood Elementary Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Education Center Warren Woods Public Schools - Tower High School

Expected Completion Date

Submitted Requests - Not Approved

O R 7/31/2009

D VE

Route (Infrastructure Only)

612 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Waterford School District

Waterford School District

Waterford School District

Waterford School District

Waterford School District Waterford School District

Waterford School District Waterford School District

Waterford School District

Waterford School District

Waterford

Waterford

Waterford

Waterford

Waterford

Waterford

Project Name

Project Description

Waterford

Upgrade current video head ends to include video on demand. This technology will provide students, teachers and staff with access to a wide variety of information using video based communications. Video on demand allows access anywhere anytime information delivery and instructional content. May,2009

Waterford

With fiber in place, we will be able to initiate a convergence of our communications systems. We would be able to run our phones through the fiber and integrate our voicemail & Email system. This would allow us to save money in the long run and integrate a variety of systems.

Waterford

The servers in each of our buildings need to be replaced and upgraded. Building server replacement and upgrades would include replacing the 10 year old servers in each building and upgrade switches in the head-end rooms and IDF's with gig and ten gigabyte interconnectors between the head end and IDF's May,2009

Waterford

Window and Door replacement: Due to the age of our buildings, many of our facilities do not have energy efficient windows and window treatment. Both interior and exterior doors are in need of replacement to assure energy savings and to increase safety of our students. May,2009

Waterford

Expansion of parking areas at all schools. This is due to increase bus traffic and parent drop off. Elementary buildings were constructed as neighborhood schools where students walked to school. Redesign and construction necessary based on volume, but more importantly on the safety of our students.

Waterford

Replacement of roofs. Numerous roofs in the district have exceeded their useful life and are in need of replacement. Many others have use left but are not as energy efficient as current roofing systems.

st

Waterford

Waterford

Waterford

Waterford

Waterford

02262009

d e tt

t i m

Waterford

b u S

Waterford

s

O N

D VE

165,000

$

400,000

May, 2010

$

1,600,000

September,2009

$

3,925,020

May,2009

September ,2009

$

5,032,000

May , 2009

September,2009

$

5,056,000

9/1/2009

$

8,243,235

O R

May,2009

PP

Elementary cafeteria and kitchen expansion. The Waterford School District has 14 elementary schools all built in the late 50's early 60's. When built, most students walked to school and went home for lunch. This expansion will allow the district to provide lunches and breakfast in a more suitable area for our elementary students. 43% of our student population qualifies for free and reduced breakfast and lunch. We serve over 1 million meals annually. 5/1/2009 Middle School, High School cafeteria and kitchen expansion. Rationale is the same as stated above for the elementary schools. May,2009

q e R

May, 2010

Funding Request

$

A T

e u

Waterford

Start Date

Expected Completion Date

May, 2010

November,2009

$

11,000,000

Replacement of present heating and cooling systems. This includes upgrades to more energy efficient boiler and air- conditioning along with implementation of geothermal technology to reduce energy costs and to provide a more environmentally friendly operation. May,2009

September,2009

$

34,372,009

Due to our limited bandwidth, we need to build up our network infrastructure by Installing a fiber optic backbone, connecting all 26 of our buildings. Many of the educational web applications include either streaming video and audio, and the business applications are also becoming more data rich and web based. Our current cable network is running at the maximum capacity, and we cannot allow these streaming sites if we are to maintain the integrity of the business applications. This would also allow us to do disaster recovery and off site backup within the district. May,2009

September, 2011

$

7,000,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

613 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Waterford School District Watervliet School District Watervliet School District Watervliet School District Watervliet School District Watervliet School District Watervliet School District Watervliet School District Paw Paw Public School District

Paw Paw Public School District

Paw Paw Public School District Paw Paw Public School District Paw Paw Public School District Paw Paw Public School District

Project Description

Start Date

The most recent new building in the Waterford School District was originally constructed in 1969. Numerous additions and renovations have been supported by the local community. Many additions and extensive remodeling is still needed in our schools. Restrooms need to be renovated, including more efficient fixtures to reduce water usage. Classrooms need to be constructed that will enhance the learning environment of our students. Physical Education facilities need to be upgraded to support life long fitness. Career and Technical Education faculties need to be expanded and created to meet the needs of our students and to provide technical training for the non college bound student. May,2009

21,805,063

12/31/2009

$

100,000

10/31/2009

$

150,000

7/1/2009

10/31/2009

$

880,000

6/8/2009

8/31/2009

$

200,000

8/31/2009

$

550,000

Watervliet High School

Upgrade all classrooms with technology 6/8/2009 Resurface current outdated track and add lanes to allow for district competition using "green" materials. 6/8/2009

8/1/2009

$

195,000

Watervliet High School and Middle School

Install Security Cameras in the High School and Middle School

10/31/2009

$

50,000

Paw Paw Public Schools - Districtwide

Renovate the technology infrastructure (cable, switched, MDF, wireless) including adding security cameras and changeover of all phones which includes every classroom

within 90 days of within 6 months of funding start $

950,000

Build a pole barn structure at the high school for storage of maintenance, grounds, and other equipment

depending on weather, within 120 days of funding

within 6 months of start $

30,000

depending on weather, within 120 days of funding

within 3 months of start $

60,000

6/15/2009

7/1/2010

$

1,300,000

8/1/2010

$

290,000

Paw Paw Public Schools-Districtwide

Install networked printers in place of old copy machines for teacher access to better printing technology which is also more cost effective than current ink jet printers, etc, Within 90 days of within 3 months of in the classrooms. funding start $

40,000

Paw Paw Public Schools - High School and Later elementary Wayne Co RESA Annex - Mechanical Systems Replacement

depending on weather, within Repair cracked areas of the High School student parking lot and the Later Elementary 120 days of parking lot funding Replace all current mechanical systems, wiring and controls for efficiency and future energy savings. 7/1/2009

4/1/2010

$

1,300,000

Wayne Co RESA Annex - Lighting and Security Upgrades

Project to refit all current lighting in the building with "green technology" , LED's and motion sensors for future energy savings. Purchase of and installation of IT wiring, security cameras for hardening of the building protection systems.

11/1/2009

$

300,000

Watervliet Watervliet

Watervliet High School Upgrade antiquated lighting in auditorium Watervliet High School, North Elementary and South Elementary Replace outdated windows with energy efficient windows

Watervliet

Watervliet Public Schools - All Schools

Network Upgrade to connect elementaries via fiber lines, and upgrade networks

Watervliet

Watervliet Public Schools - All Schools

Obtain Wireless Computer Labs for Instruction & Training

Watervliet

Watervliet Public Schools - All Schools

Watervliet Watervliet

Waverly Township

Paw Paw Public Schools-HS

Waverly Township

Paw Paw Public Schools-HS

Waverly Township

Paw Paw Public Schools

Waverly Township

Waverly Township

u S

Waverly Township

Wayne Resa

Wayne

Wayne

02262009

itt

d e t

q e R

Paw Paw Public Schools

bm

e u

st

s

6/8/2009

PP

7/1/2009

A T

O N

Replace asphalt driveway at entrance of the high school Addition to HS at PAC end of building. Additional renovation to HS and MS within bond project scope. Work has to be done around school sessions

7/1/2009

Build 2-- 65 KW wind turbines to provide renewable energy to the district buildings and reduce our reliance on carbon based fuels. Needs significant approvals and permits from outside the district which impacts the timing 7/1/2009

Submitted Requests - Not Approved

7/1/2009

Route (Infrastructure Only)

D VE $

Waterford

Waverly Township

O R

Funding Request

September, 2011

Waterford

Paw Paw Public School District

Wayne Resa

Project Name

Expected Completion Date

within 3 months of start $

75,000

614 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne Resa

Wayne Resa

Project Name

Project Description

Start Date

Expected Completion Date

Upgrade of office space, wiring and equipment to supplement the expanded services and manpower needs to local districts in the delivery programs mandated by federal and state requirements. 7/1/2009

Wayne

Wayne Co. RESA Education Center Administrative Technologies Renovations

Wayne

Project to refit all current lighting in the building with "green technology" , LED's and Wayne Co. RESA-Education Center - Lighting motion sensors for future energy savings. Purchase of and installation of IT wiring and / Security Upgrade security cameras for hardening of the building protection systems. 7/1/2009

1/1/2010

11/1/2009

Funding Request

$

1,500,000

D VE $

425,000

12/1/2010

$

5,389,163

O R

Webberville Elementary School Remodeling

Major remodeling of the two story 1912 wing with a 400 SF entrance addition and general remodeling of the 1940 and 1989 wings. Major remodeling will completely restore the 1912 building for 21st century learning environments, accessibility and energy efficiency. General remodeling of the remaining building will also upgrade for for 21st century learning environments, accessibility and energy efficiency. New technology and technology infrastructure will be included. Sustainability/green design will be utilized in the project including product selection, HVAC design, building envelope improvements and lighting improvements. 7/1/2009

Webberville Secondary School Remodeling

General remodeling of the existing 1959 and 1969 secondary wings with a 400 SF entrance addition. Remodeling will include upgrades for 21st century learning environments, accessibility and energy efficiency. New technology and technology infrastructure will be included. Sustainability/green design will be utilized in the project including product selection, HVAC design, building envelope improvements and lighting improvements. Project will also include a 1200 SF environmental research laboratory addition to the agriculture building, a new 2400 SF Transportation/Maintenance building and site improvements to improve safety and control site drainage. 7/9/2009

12/9/2010

$

7,125,475

Walled Lake Consolidated Schools West Bloomfield Twp

Walled Lake - Walled Lake El

Replace deteriorated asbestos floor tile in gym

6/1/2009

8/31/2009

$

100,000

Wayne-Westland Community School District

Westland

Adams Middle School

Update and remodel 8 lavatories

6/15/2009

9/6/2009

$

200,000

Wayne-Westland Community School District

Westland

Hamilton Elementary

Add timeclock/photocell controls to canopy lights

6/15/2009

9/6/2009

$

10,000

Wayne-Westland Community School District

Westland

Kettering Elementary

Replace some exterior doors

6/15/2009

9/6/2009

$

15,000

Wayne-Westland Community School District

Westland

Adams Middle School

Add HVAC controls to south end of building

6/15/2009

9/6/2009

$

20,000

Wayne-Westland Community School District

Westland

Madison Elementary

Add parking lot lighting

6/15/2009

9/6/2009

$

20,000

Wayne-Westland Community School District

Westland

Wildwood Elementary

Replace transformer-downsize

6/15/2009

9/6/2009

$

20,000

Wayne-Westland Community School District

Westland

Buildings and Grounds

Exterior Windows, Door, Frame &Hardware replacement

6/15/2009

9/6/2009

$

25,000

Wayne-Westland Community School District

Westland

Schweitzer Elementary

Re seam roof

6/15/2009

9/6/2009

$

25,000

Webberville Community Schools

Webberville Community Schools

Webberville

Webberville

02262009

tt i m

S

ub

d e t

T O

q e R

N s

st

e u

P P A

Submitted Requests - Not Approved

Route (Infrastructure Only)

615 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Madison Elementary

Replace some exterior doors

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Adams Middle School

Replace and improve parking lot lighting LED

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Stottlemyer Early Childhood Ctr

Add Motion sensors/switches to classroom bathrooms

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Wildwood Elementary

Add Motion sensors/switches to classroom bathrooms

6/15/2009

Wayne-Westland Community School District

Westland

Stevenson Middle School

Re seam roof

Wayne-Westland Community School District

Westland

Buildings and Grounds

Add DDC temperature controls to garage/shops/warehouse

Wayne-Westland Community School District

Westland

Transportation Bldg

Replace roof top unit

Wayne-Westland Community School District

Westland

Marshall Middle School

Replace roof top unit C-pod

Wayne-Westland Community School District

Westland

John Glenn High School

Wayne-Westland Community School District

Westland

Franklin Middle School

Wayne-Westland Community School District

Westland

Administration Building

Wayne-Westland Community School District

Westland

Hoover Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

25,000

$

35,000

$

40,000

9/6/2009

$

40,000

6/15/2009

9/6/2009

$

45,000

6/15/2009

9/6/2009

$

50,000

6/15/2009

9/6/2009

$

50,000

6/15/2009

9/6/2009

$

50,000

Replace RTU in fine Arts with VAV system

6/15/2009

9/6/2009

$

50,000

Air Conditioning in 505 &507 life skills

6/15/2009

9/6/2009

$

60,000

Replace Pool filtering system

6/15/2009

9/6/2009

$

75,000

Cap asphalt parking lot improve student safety and storm water management

6/15/2009

9/6/2009

$

80,000

Jefferson Elementary

Cap asphalt parking lot improve student safety and storm water management

6/15/2009

9/6/2009

$

80,000

Marshall Middle School

Repave portion of parking lot improve student safety and storm water management

6/15/2009

9/6/2009

$

80,000

Roosevelt Elementary

Update plumbing building wide

6/15/2009

9/6/2009

$

80,000

Administration Building

Exterior Windows, Door, Frame &Hardware replacement

6/15/2009

9/6/2009

$

100,000

Westland

Career Tech Center

Exterior Windows, Door, Frame &Hardware replacement

6/15/2009

9/6/2009

$

100,000

Westland

Walker Elementary

Replace # 3 boiler

6/15/2009

9/6/2009

$

100,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

P P A

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

616 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Hicks Elementary

Replace both asphalt parking lots improve student safety and storm water management.

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Lincoln Elementary

Replace both pod units with HVAC

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Marshall Middle School

Replace Gym HVAC units

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Administration Building

Mechanical upgrades replace 2 Boilers

6/15/2009

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Mechanical upgrades: replace 2 Boilers

Wayne-Westland Community School District

Westland

Walker Elementary

Re roofing portions of building

Wayne-Westland Community School District

Westland

Franklin Middle School

Replace 3 roof tops on pods (classrooms, IMC, Shops)

Wayne-Westland Community School District

Westland

Schweitzer Elementary

Add bus or student drop off to improve student safety and storm water management

Wayne-Westland Community School District

Westland

Adams Middle School

Wayne-Westland Community School District

Westland

Career Tech Center

Wayne-Westland Community School District

Westland

Franklin Middle School

Wayne-Westland Community School District

Westland

Jefferson Elementary

Wayne-Westland Community School District

Westland

Hoover Elementary

Wayne-Westland Community School District

Westland

Patchin Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

100,000

$

100,000

$

100,000

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

165,000

Replace both asphalt parking lots improve student safety and storm water management.

6/15/2009

9/6/2009

$

180,000

Replace 2 boilers and DHW boilers

6/15/2009

9/6/2009

$

200,000

Update and remodel 8 lavatories

6/15/2009

9/6/2009

$

200,000

Re roof

6/15/2009

9/6/2009

$

210,000

Re roof

6/15/2009

9/6/2009

$

225,000

Re roof

6/15/2009

9/6/2009

$

230,000

Edison Elementary

Re roof

6/15/2009

9/6/2009

$

250,000

Hicks Elementary

Re roof

6/15/2009

9/6/2009

$

275,000

Westland

Lincoln Elementary

Re roof

6/15/2009

9/6/2009

$

300,000

Westland

Elliott Elementary

Re roof

6/15/2009

9/6/2009

$

300,000

02262009

t i m

d e tt

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

617 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Madison Elementary

Re-roof

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Wildwood Elementary

Re roof

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

PD Graham Elementary

Re roof

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Mechanical upgrades replace 2 Boilers

6/15/2009

Wayne-Westland Community School District

Westland

Kettering Elementary

Re roof

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Replace all class room unit vents with HVAC units and lighting censors

Wayne-Westland Community School District

Westland

Marshall Middle School

Re roofing portions of building

Wayne-Westland Community School District

Westland

Roosevelt Elementary

Re seam roof

Wayne-Westland Community School District

Westland

Administration Building

Re-roof

Wayne-Westland Community School District

Westland

John Glenn High School

Wayne-Westland Community School District

Westland

Career Tech Center

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

300,000

$

306,000

$

310,000

9/6/2009

$

350,000

6/15/2009

9/6/2009

$

400,000

6/15/2009

9/6/2009

$

400,000

6/15/2009

9/6/2009

$

435,000

6/15/2009

9/6/2009

$

450,000

6/15/2009

9/6/2009

$

450,000

Cap asphalt parking lot improve student safety and storm water management

6/15/2009

9/6/2009

$

500,000

Replace all roof top units

6/15/2009

9/6/2009

$

500,000

Update and remodel 20 lavatories

6/15/2009

9/6/2009

$

500,000

Franklin Middle School

Re roof portion of the building and re seam the rest

6/15/2009

9/6/2009

$

600,000

Wayne Memorial High School

Re roofing portions of building

6/15/2009

9/6/2009

$

600,000

Walker Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

600,000

Jefferson Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

700,000

Westland

Marshall Middle School

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

700,000

Westland

Patchin Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

700,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

618 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Hamilton Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Hicks Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Madison Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Schweitzer Elementary

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

Wayne-Westland Community School District

Westland

Stottlemyer Early Childhood Ctr

Replace all class room unit vents with HVAC units and lighting censors

Wayne-Westland Community School District

Westland

Edison Elementary

Replace all class room unit vents with HVAC units and lighting sensors

Wayne-Westland Community School District

Westland

Tinkham Alternative Center

Replace Heating and cooling system

Wayne-Westland Community School District

Westland

Wildwood Elementary

Replace Heating and cooling system/add DDC temp. controls

Wayne-Westland Community School District

Westland

Roosevelt Elementary

Wayne-Westland Community School District

Westland

Elliott Elementary

Wayne-Westland Community School District

Westland

Lincoln Elementary

Wayne-Westland Community School District

Westland

Kettering Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

800,000

D VE $

800,000

$

800,000

9/6/2009

$

800,000

6/15/2009

9/6/2009

$

800,000

6/15/2009

9/6/2009

$

800,000

6/15/2009

9/6/2009

$

800,000

6/15/2009

9/6/2009

$

800,000

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

900,000

Replace all class room unit vents with HVAC units and lighting sensors

6/15/2009

9/6/2009

$

900,000

Replace all classroom unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

1,000,000

Replace all classroom unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

1,050,000

John Glenn High School

Replace all class room unit vents with HVAC units and lighting censors

6/15/2009

9/6/2009

$

1,300,000

Kettering Elementary

Gutters and down spouts need replacing

6/15/2009

9/6/2009

$

25,000

Transportation Bldg

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

25,000

Madison Elementary

Re-pave play areas

6/15/2009

9/6/2009

$

40,000

Westland

Adams Middle School

Replace classroom doors on the 71 addition (50)

6/15/2009

9/6/2009

$

75,000

Westland

Hamilton Elementary

Replace main entrance canopy

6/15/2009

9/6/2009

$

150,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

619 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Edison Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Elliott Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Hamilton Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Hicks Elementary

Update all playground equipment and fall zones

6/15/2009

Wayne-Westland Community School District

Westland

Hoover Elementary

Update all playground equipment and fall zones

Wayne-Westland Community School District

Westland

Jefferson Elementary

Update all playground equipment and fall zones

Wayne-Westland Community School District

Westland

Kettering Elementary

Update all playground equipment and fall zones

Wayne-Westland Community School District

Westland

Lincoln Elementary

Update all playground equipment and fall zones

Wayne-Westland Community School District

Westland

Madison Elementary

Wayne-Westland Community School District

Westland

Patchin Elementary

Wayne-Westland Community School District

Westland

PD Graham Elementary

Wayne-Westland Community School District

Westland

Roosevelt Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

200,000

$

200,000

$

200,000

9/6/2009

$

200,000

6/15/2009

9/6/2009

$

200,000

6/15/2009

9/6/2009

$

200,000

6/15/2009

9/6/2009

$

200,000

6/15/2009

9/6/2009

$

200,000

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Schweitzer Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Stottlemyer Early Childhood Ctr

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Vandenberg Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Walker Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

Westland

Wildwood Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

250,000

Westland

John Glenn High School

Locker room update and remodel

6/15/2009

9/6/2009

$

300,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

620 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Career Tech Center

Replace casework building wide

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Franklin Middle School

Locker room updates

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Adams Middle School

Remodel locker rooms

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Administration Building

Pool remodel / floor and locker rooms

6/15/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Replace casework Science, Home Economics and Art rooms

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Replace casework Science, Home Economics and Art rooms

Pewamo-Westphalia Community Schools

Westphalia

Pewamo-Westphalia JH/HS

Pewamo-Westphalia Community Schools

Westphalia

Pewamo-Westphalia Community Schools Pewamo-Westphalia Community Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools

Funding Request

$

D VE

300,000

$

400,000

$

400,000

9/6/2009

$

600,000

6/15/2009

9/6/2009

$

900,000

6/15/2009

9/6/2009

$

900,000

Installation of energy efficient lighting throughout the building.

6/15/2009

8/15/2009

$

100,000

Pewamo-Westphalia JH/HS

Replacement of inefficient boiler to modern, energy efficient unit.

6/15/2010

8/15/2010

$

150,000

Westphalia

Pewamo-Westphalia JH/HS

Woodshop electrical, communications and fire safety upgrade, including the construction of a short enclosed walkway between the main HS building and this separate woodshop building. This project would enhance security by containing all student areas, providing for the capability for controlled access and immediate lockdown. It would also conserve energy by enclosing entranceways.

6/1/2010

8/30/2010

$

200,000

Westphalia

Pewamo-Westphalia JH/HS White Cloud Public Schools / Jack D Jones Elementary White Cloud Public Schools / White Cloud High School White Cloud Public Schools / White Cloud Junior High White Cloud Public Schools / White Cloud Upper Elementary White Cloud Public Schools / White Cloud Upper Elementary White Cloud Public Schools / White Cloud High School White Cloud Public Schools / White Cloud High School White Cloud Public Schools / White Cloud Upper Elementary White Cloud Public Schools / White Cloud High School White Cloud Public Schools / Jack D Jones Elementary White Cloud Public Schools / White Cloud Junior High

Computer lab upgrade 6/15/2009 Replace the old tube TVs and VCRs with energy star rated LCD TVs and DVD Players Players at Jack D Jones Elementary 6/15/2009 Replace the old tube TVs and VCRs with energy star rated LCD TVs and DVD Players Players at White Cloud High School 6/15/2009 Replace the old tube TVs and VCRs with energy star rated LCD TVs and DVD Players Players at White Cloud Junior High School 6/15/2009 Replace the old tube TVs with energy star rated LCD TVs and DVD Players Players a White Cloud Upper Elementary 6/15/2009 Replace old T12 lights with more energy efficient T8 lights in White Cloud Upper Elementary 6/15/2009 Update HVAC controls to gain better control of the system to reduce heating and cooling costs 6/15/2009

8/15/2009

$

150,000

7/15/2009

$

20,000

7/15/2009

$

20,000

7/15/2009

$

20,000

7/15/2009

$

20,000

7/15/2009

$

27,000

6/19/2009

$

56,300

Install photovoltaic cells to generate electricty

7/1/2009

9/15/2009

$

75,000

Install photovoltaic cells to generate electricty

7/1/2009

9/15/2009

$

75,000

7/15/2009

$

110,300

7/15/2009

$

156,900

7/15/2009

$

190,000

White Cloud White Cloud White Cloud

White Cloud

S

White Cloud White Cloud White Cloud

02262009

t s e

e t tt

i m

ub

White Cloud

White Cloud

N s

u q e

R d

White Cloud

White Cloud

T O

P P A

Replace old T12 lights with more energy efficient T8 lights in White Cloud High School6/15/2009 Replace old T12 lights with more energy efficient T8 lights in Jack D Jones Elementary 6/15/2009 Replace old T12 lights with more energy efficient T8 lights in White Cloud Junior High School 6/15/2009

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

621 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools White Cloud Public Schools

Location City or Township White Cloud White Cloud White Cloud White Cloud

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

Huron Valley Schools

White Lake

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

Project Name White Cloud Public Schools / Jack D Jones Elementary White Cloud Public Schools / White Cloud Upper Elementary White Cloud Public Schools / White Cloud High School White Cloud Public Schools / White Cloud High School Huron Valley Schools - White Lake Middle School

White Pigeon

White Pigeon

White Pigeon

Funding Request

6/15/2009

6/19/2009

$

22,000

Replace the desktop computers at White Cloud Upper Elementary

6/15/2009

6/19/2009

$

30,000

Install a Storage Area Network (SAN) at White Cloud High School

6/15/2009

6/19/2009

$

50,000

Replace the carpet at White Cloud High School

6/15/2009

7/15/2009

$

127,600

Replace condensing unit

6/15/2009

$

50,000

Replace lighting in aux gym, main gym and pool to T5 fixtures

6/15/2009

9/1/2010

$

200,000

Replace cooling tower and boilers

6/15/2010

9/1/2010

$

1,350,000

6/15/2010

9/1/2010

$

250,000

6/15/2010

9/1/2010

$

135,000

6/15/2010

9/1/2010

$

175,000

Replace ceilings and upgrade lighting to more energy efficient lighting

6/15/2010

9/1/2010

$

400,000

Huron Valley Schools - Lakeland High School Replace small boiler, pumps, AHU 4 & 5, and gym air handler Huron Valley Schools - Lakewood Elementary School Replace ceilings and upgrade lighting to more energy efficient lighting

6/15/2010

9/1/2010

$

450,000

6/15/2010

9/1/2010

$

540,000

To be determined. Can be ready to Replace the existing main water drain to the village sewer system. Improvements to start work in 60 the manholes and piping are necessary. days. Summer of 2009

$

40,000

To be determined. Can be ready to start work in 60 days. Summer of 2009

$

50,000

To be determined. Can be ready to start work in 60 Replace all bathroom fixtures, floors, and stalls to improve use and energy efficiency. days. Summer of 2009

$

75,000

The stage needs new curtains, floor, lighting, and other structural improvments.

To be determined. Can be ready to start work in 60 days. Summer of 2009

$

120,000

The band and choir rooms at the high school are in much needed repair and renovation. Improvements to the walls, floor structure, and office areas are needed.

To be determined. Can be ready to start work in 60 days. Summer of 2009

$

200,000

White Pigeon Community Schools

d e t

White Pigeon Community Schools

tt i m

White Pigeon Community Schools

b u S

White Pigeon

Start Date

Install a security system and Jack D Jones Elementary

Huron Valley Schools - Lakeland High School Huron Valley Schools - Power Plant for 3 schools Bogie Lake Campus Huron Valley Schools - Brooks Elementary School Huron Valley Schools - Lakewood Elementary School Huron Valley Schools - Lakewood Elementary School Huron Valley Schools - Oxbow Elementary School

White Pigeon

02262009

Project Description

Expected Completion Date

White Pigeon Community Schools

White Pigeon Community Schools

A T

Replace entire roof with higher insulation value Replace office and gym air handlers and ductwork Replace original boiler with 90% efficient boiler

e u

st

q e R

s

O N

both buildings are in need of new hot water heaters and storage units.

Submitted Requests - Not Approved

PP

O R 9/1/2010

D VE

Route (Infrastructure Only)

622 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools

White Pigeon Community Schools Whitehall District Schools Whitehall District Schools

Whitehall District Schools Whitehall District Schools Whitehall District Schools

White Pigeon

White Pigeon

White Pigeon

White Pigeon

White Pigeon

White Pigeon

02262009

$

250,000

White Pigeon Community Schools

To be determined. Can be ready to The district needs to improve technology equipment for media centers, computer lab, start work in 60 and classroom use. days. Summer of 2009

$

350,000

White Pigeon Community Schools

To be determined. Can be ready to Replace existing sidewalks and parking lots at Central Elementary and the middle/highstart work in 60 school. They are in much need of replacement. days. Summer of 2009

$

700,000

White Pigeon Community Schools

To be determined. Can be ready to Electrical improvements are necessary to handle the capacity of new technology and start work in 90 equipment. days. Fall of 2009

$

100,000

White Pigeon Community Schools

To be determined. Can be ready to The current tile floor from 1954 needs to be replaced to allow for a safe and effective start work in 90 physical education program. days. Winter 2009

$

150,000

White Pigeon Community Schools

Significant upgrades and improvements are necessary to the high school science rooms built in 1967. The upgrades are needed to meet new MME chemistry and physics requirements.

To be determined. Can be ready to start work in 120 days. Winter 2009

$

150,000

To be determined. Can be ready to start work in 90 days. Winter 2009

$

450,000

$

500,000

9/1/2009

$

83,600

9/1/2009

$

275,000

9/1/2009

$

335,500

9/1/2009

$

973,500

8/1/2010

$

291,500

e t tt

O R

T O

s t s

-N

e u

eq

i m

S

The cafeterias and libraries at Central Elementary and the middle/high school are in need of upgrades and improvements.

To be determined. The locker rooms and shower facilities need significant upgrade and reconditioning to Can be ready to improve efficiency for healthy and effective physical education classes at both start work in 120 buildings. The 1967 high school gym floor needs replacement. days. Winter of 2009

High School Whitehall District Schools

Shoreline Elementary Whitehall District Schools Community Services Building Whitehall District Schools Transportation Building Whitehall District Schools

Replace existing HVAC system controls with new DDC controls and tie the building into the District's current internet based Building Management System to allow for monitoring and scheduling of HVAC operations to reduce building energy usage costs 7/1/2009 Replace existing exterior window wall system with a thermally improved storefront / glazing system to reduce energy usage costs 7/1/2009 Construct new bus wash bay facility with high efficiency wash systems to conserve energy usage and water usage. 10/1/2009

ub

D VE

P P A

Remodel existing gymnasium including removal of non-code compliant bleacher systems, additional storage areas, replacement of leaking windows, and replacement of leaking roof 7/1/2009 Install new wind turbine equipment to generate a renewable energy source and to reduce energy usage 7/1/2009

Middle School Whitehall District Schools

Whitehall

Funding Request

White Pigeon Community Schools

White Pigeon Community Schools

Whitehall

Whitehall

Start Date

To be determined. Can be ready to Repair the brick wall structure at Central Elementary and the middle school and high start work in 60 school. We have immediate need areas for ventilation and structural repair. days. Summer of 2009

White Pigeon Community Schools

White Pigeon

Whitehall

Project Description

R d

White Pigeon

Whitehall

Project Name

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

623 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Whitehall District Schools Whitehall District Schools Whitehall District Schools Whitehall District Schools Whitehall District Schools Whitehall District Schools

Project Name

Project Description

Start Date

Whitehall District Schools

Acquiring, installing and equipping technology for school buildings; remodeling, furnishing and refurnishing and equipping and re-equipping school buildings; erecting, furnishing and equipping an addition to a school building; purchasing school buses; constructing, developing and improving athletic and physical education facilities, play fields and playgrounds; and acquiring, developing and improving sites.

Whitehall

Shoreline Elementary Whitehall District Schools Shoreline Elementary Whitehall District Schools

Demolish and remove existing unused portable classroom building. This building is currently unoccupied and presents a safety hazard to students at this location. Install new corridor walls at existing media center to create a fire protected exit corridor for occupant egress safety.

Whitehall

Ealy Elementary Whitehall District Schools

Whitehall

High School Whitehall District Schools

Whitehall

Middle School Whitehall District Schools

Whitehall

Whitehall

Expected Completion Date

5/1/2009

PP

Install new corridor lockers for student use to eliminate combustable materials in egress corridors and provide adequate capacity for student belongings 7/1/2009 Remodel existing classroom into new science lab classroom for compliance with State mandated curriculum changes 10/1/2009 Construct new science lab classroom addition (1,200 sf) for compliance with State mandated curriculum changes. 10/1/2009

A T

D VE $

22,080,000

$

7,150

$

7,150

9/1/2009

$

146,300

8/1/2010

$

122,650

7/1/2009

O R

7/1/2009

Funding Request

9/1/2009

7/1/2010

$

280,500

12/31/2009

$

300,000

Wilcox Township

Mill Creek Elementary White Cloud Public Schools / White Cloud High School

This project is to construct, equip and furnish two new classrooms at Mill Creek Elementary. Presently, this elementary is at full capacity student-wise. Nearly 5 years ago we added four classrooms. The addition was configured in a way so that 2 additional classrooms could be readily added. 9/1/2009 Build a communications tower

7/1/2009

9/15/2009

$

100,000

4/9/2009

9/9/2009

$

350,000

4/9/2009

9/9/2009

$

500,000

Williamston

WilliamstonAll schools

Install sidewalks for safe routes to schools

Williamston

Williamston Roof replacement at HS

Replace existing HS roof

WoodhavenBrownstown School District

Woodhaven

Woodhaven-Brownstown School District Erving Elementary

Replace roof where needed. Replacement with green roof materials where applicable.

6/20/2009

8/1/2009

$

550,000

WoodhavenBrownstown School District

Woodhaven

Woodhaven-Brownstown School District Erving Elementary

Upgrade HVAC Systems and Controls

8/1/2009

8/1/2011

$

750,000

WoodhavenBrownstown School District

Woodhaven

Woodhaven-Brownstown School District Bates Elementary

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls

8/1/2009

8/1/2011

$

1,250,000

WoodhavenBrownstown School District

Woodhaven

Woodhaven-Brownstown School District Bates Elementary

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls

8/1/2009

8/1/2011

$

1,450,000

WoodhavenBrownstown School District

Woodhaven

Woodhaven-Brownstown School District Patrick Henry MS

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls. Install energy efficient lighting.

8/1/2009

8/1/2011

$

1,750,000

WoodhavenBrownstown School District

Woodhaven

Woodhaven-Brownstown School District Woodhaven HS

Replace roof where needed. Replacement with green roof materials where applicable. Upgrade HVAC Systems and Controls. Install energy efficient lighting.

8/1/2009

8/1/2011

$

2,350,000

Gibraltar School District-all buildings Gibraltar School District Weiss Elementary School

Upgrade routers, switches and site optics to incorporate the new Wide Area Fiber Network and phone system being installed district-wide. Upgrade the Call Manager phone system and wired and wireless network security

March, 2009

June, 2009

$

263,000

Removal and Disposal of 3000 gal underground storage tank for heating oil

July, 2009

Aug, 2009

$

60,000

Gibraltar School District all buildings

Security System-in High School and Middle School a total of 60 cameras, monitors, software and buzzer front entrance system. In all other buildings, camera, monitor and buzzer front entrance system.

June, 2009

Dec, 2009

$

300,000

Gibraltar School District Gibraltar School District Gibraltar School District

Whitewater Township

O N

Elk Rapids Schools White Cloud Public Schools Williamston Community Schools Williamston Community Schools

u S

Woodhaven Woodhaven

Woodhaven

02262009

itt

d e t

bm

st

e u

q e R

s

Submitted Requests - Not Approved

Route (Infrastructure Only)

624 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools Lakewood Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Woodland Twp

Lakewood HS & MS

Run fiber to Ionia ISD from Lakewood HS

6/1/2009

9/1/2009

$

210,000

Woodland Twp

Lakewood Elementaries (4)

Run fiber from Lakewood HS to 4 elementary bldgs

6/1/2009

9/1/2009

$

390,000

Woodland Twp

Lakewood Woodland Elementary

Renovation of Woodland Elementary

6/1/2009

12/31/2009

$

3,300,000

Woodland Twp

Lakewood HS

Addition & renovations to Lakewood HS

9/1/2008

9/1/2010

$

21,460,000

$

898,000

9/1/2009

$

33,886

6/1/2009

9/1/2009

$

35,914

O R

D VE

Wyandotte City School District Wyandotte Wyoming Public Schools Wyoming

Security management system consisting of energy star rated digital video recorders, pan, tilt, zoom cameras on the interior and exterior of each of our 11 buildings. 6/18/2009 14labs of classroom response system clickers for immediate learning and Wyoming Public Schools - District Elementary assessment feedback across all curricular areas 6/1/2009

Wyoming Public Schools

Wyoming

Cutting-edge science technology in chemistry, physics, physical science, math or biology labs with the use of handheld interfaces, sensors, probes, measuring tools, software, and curriculum. Addition of 2 smartboard screens and projection units in math labs for hands on integration of technology into math curriculum. 4 labs of classroom response system clickers for immediate learning and assessment Wyoming Public Schools - Innovations School feedback across all curricular areas.

Wyoming

Wyoming Public Schools - Jackson Park School

Cutting-edge science technology in chemistry, physics, physical science, math or biology labs with the use of handheld interfaces, sensors, probes, measuring tools, software, and curriculum. Addition of 2 smartboard screens and projection units in math labs for hands on integration of technology into math curriculum. 4 labs of classroom response system clickers for immediate learning and assessment feedback across all curricular areas.

6/1/2009

9/1/2009

$

40,712

Wyoming Public Schools - Newhall School

Cutting-edge science technology in chemistry, physics, physical science, math or biology labs with the use of handheld interfaces, sensors, probes, measuring tools, software, and curriculum. Addition of 2 smartboard screens and projection units in math labs for hands on integration of technology into math curriculum. 4 labs of classroom response system clickers for immediate learning and assessment feedback across all curricular areas.

6/1/2009

9/1/2009

$

40,712

4 Cutting-edge science technology in chemistry, physics, physical science, math or biology labs with the use of handheld interfaces, sensors, probes, measuring tools, software, and curriculum. Addition of 4 smartboard screens and projection units in math labs for hands on integration of technology into math curriculum. 4 labs of classroom response system clickers for immediate learning and assessment feedback across all curricular areas.

6/1/2009

9/1/2009

$

112,348

Wyoming Public Schools - Wyoming Park High School

4 Cutting-edge science technology in chemistry, physics, physical science, math or biology labs with the use of handheld interfaces, sensors, probes, measuring tools, software, and curriculum. Addition of 4 smartboard screens and projection units in math labs for hands on integration of technology into math curriculum. 4 labs of classroom response system clickers for immediate learning and assessment feedback across all curricular areas.

6/1/2009

9/1/2009

$

112,348

Wyoming Public Schools - Newhall School

Renovation of existing shop spaces into classroom space.

6/1/2009

9/1/2009

$

823,200

Wyoming Public Schools - Jackson Park School

Addition of a new four classroom wing and interior remodeling to convert a tiered lecture room into a single level teaching space along with remodeling of corner office spaces off the media center to create larger rooms for special education resource rooms. 6/1/2009

8/1/2010

$

2,864,310

Wyoming Public Schools

Wyoming Public Schools

Wyoming Public Schools

Wyoming Public Schools Wyoming Public Schools

Wyoming Public Schools

Wyoming

Wyoming

Wyoming Wyoming

Wyoming

02262009

Wyandotte Public Schools All Buildings

T O

tt i m

d e t

Wyoming Public Schools - Rogers High School

b u S

N s

st

e u

q e R

P P A

Submitted Requests - Not Approved

August '09

Route (Infrastructure Only)

625 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wyoming Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools

Godfrey-Lee Public Schools

Project Description

Start Date

Wyoming

Wyoming Public Schools - Rogers High School

Addition of a new classroom wing above the existing south classroom wing of the building to allow combining the two present 9-12 high schools into one single 10-12 high school. Project also includes addition of a new 1,200 seat performing arts center, music classrooms and support space, a new building entrance and public lobby and remodeling of existing space for expanded main office functions. Site work includes relocation of girl's softball and some of the track and field event spaces to make room for expanded parking adjacent to the building along with a new bus dropoff. Site work also includes new synthetic turf on the football game field and practice field. 6/1/2009

Wyoming

GHPS - North Elementary

Controls Upgrade (add DDC zones & schedules)

6/6/2009

Wyoming

GHPS - West Elementary

Controls Upgrade (add DDC zones & schedules)

6/6/2009

Wyoming

GHPS - South Elementary

Controls Upgrade (add DDC zones & schedules)

Wyoming

GHPS - District Administration Building

Lighting control upgrades - occupancy sensors

Wyoming

GHPS - District Service Center

Lighting control upgrades - occupancy sensors

Wyoming

GHPS - South Elementary

Replace existing deteriorated hollow metal frame and single pane glass entry vestibules (1) with air-tight insulated glass and thermal storefront framing

Wyoming

GHPS - District Administration Building

Wyoming

O R 8/28/2009

$

8,186

8/28/2009

$

8,186

6/6/2009

8/28/2009

$

8,186

6/6/2009

8/28/2009

$

11,727

6/6/2009

8/28/2009

$

11,727

6/6/2009

8/28/2009

$

36,196

8/28/2009

$

52,096

GHPS - District Administration Building

Controls Upgrade (add DDC zones & schedules) 6/6/2009 Provide perimeter heat to better balance the interior spaces and reduce overall energy costs 6/6/2009

8/28/2009

$

59,241

Wyoming

GHPS - North Elementary

Lighting control upgrades - occupancy sensors & relay control of public spaces

6/6/2009

8/28/2009

$

59,538

Wyoming

GHPS - South Elementary

Lighting control upgrades - occupancy sensors & relay control of public spaces

6/6/2009

8/28/2009

$

64,004

Wyoming

GHPS - High School PE Building

Lighting control upgrades - occupancy sensors & relay control of public spaces

6/6/2009

8/28/2009

$

74,423

Wyoming

GHPS - West Elementary

Lighting control upgrades - occupancy sensors & relay control of public spaces

6/6/2009

8/28/2009

$

74,424

GHPS - High School PE Building

Replace existing deteriorated hollow metal frame and single pane glass entry vestibules (3) with air-tight insulated glass and thermal storefront framing

6/6/2009

8/28/2009

$

89,309

GHPS - North Elementary

Replace existing deteriorated hollow metal frame and single pane glass entry vestibules (3) with air-tight insulated glass and thermal storefront framing

6/6/2009

8/28/2009

$

89,960

GHPS - High School PE Building

Controls Upgrade (add DDC zones & schedules)

6/6/2009

8/28/2009

$

93,773

GHPS - Middle School

Science Center Wing - Roof Replacement

6/6/2009

8/28/2009

$

100,520

GHPS - Middle School

Lighting control upgrades - occupancy sensors & relay control of public spaces

6/6/2009

8/28/2009

$

111,636

GHPS - High School

8/28/2009

$

128,009

GHPS - High School PE Building

Lighting control upgrades - occupancy sensors & relay control of public spaces 6/6/2009 Replace existing curtainwall with single pane glass with air-tight insulated glass and thermal storefront framing. 6/6/2009

8/28/2009

$

171,320

Godfrey-Lee Public Schools

Constructing, furnishing and equipping a new 5th and 6th grade building; acquiring, installing and equipping technology for the building and developing and improving the site.

$

875,000

itt

Wyoming Wyoming Wyoming Wyoming Wyoming Wyoming

Wyoming

02262009

u S

d e t

bm

st

e u

q e R

s

A T

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

23,484,800

PP

12/1/2010

Funding Request

$

Godwin Heights Public Schools Wyoming Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools

Project Name

Expected Completion Date

626 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools Godwin Heights Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Wyoming

GHPS - High School PE Building

Security System (cameras, IT cabling infastructure, security card access at entries)

6/6/2009

8/28/2009

$

41,796

Wyoming

GHPS - North Elementary

Security System (cameras, IT cabling infastructure, security card access at entries)

6/6/2009

8/28/2009

$

42,868

Wyoming

GHPS - West Elementary

Security System (cameras, IT cabling infastructure, security card access at entries)

6/6/2009

8/28/2009

$

42,868

Wyoming

GHPS - South Elementary

Security System (cameras, IT cabling infastructure, security card access at entries)

6/6/2009

8/28/2009

$

42,868

Wyoming

GHPS - Middle School

Security System (cameras, IT cabling infastructure, security card access at entries)

6/6/2009

$

42,868

Wyoming

GHPS - High School

Security System (cameras, IT cabling infastructure, security card access at entries)

6/6/2009

$

118,450

Yale Public Schools

partially remodeling, furnishing and refurnishing, equipping and re-equipping existing school facilities; acquiring and installing educational technology; purchasing school buses; constructing and equipping improvements to playfields, playgrounds and outdoor athletic facilities; and developing and improving sites.

$

19,265,000

O R 8/28/2009

D VE

P P A

8/28/2009

6/9/2009

8/7/2010

$

1,000

6/9/2009

8/6/2010

$

1,500

6/9/2009

8/12/2010

$

2,400

Yale Public Schools

Yale

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Central Office

Install 10 room motion sensors to control lighting

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Transportation Bldg

Install 15 room motion sensors to control lighting

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New 6" water service for fire suppression system

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Install 25 room motion sensors to control lighting

6/9/2009

8/1/2010

$

2,500

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Transportation Bldg

Windows

6/9/2009

8/23/2010

$

3,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Reconstruct sanitary sewer line from kitchen to main

6/9/2009

8/1/2009

$

3,700

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

6/9/2009

8/4/2010

$

4,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Automatic flush urinals & stools

6/9/2009

8/24/2010

$

6,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Install 60 room motion sensors to control lighting

6/9/2009

8/5/2010

$

6,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Add vestibule door and ADA hardware

6/9/2009

8/3/2010

$

7,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

New air conditioning in technology office and head end room

6/9/2009

8/1/2010

$

7,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Water restrictive water softeners

6/12/2009

8/15/2010

$

7,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Water restrictive water softeners

6/13/2009

8/16/2010

$

7,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Automatic flush urinals & stools

6/9/2009

8/27/2010

$

8,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Energy efficient water heaters

6/17/2009

8/20/2010

$

10,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New carpet in media center

6/9/2009

8/10/2010

$

10,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Automatic faucets

6/9/2009

8/1/2010

$

10,500

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Automatic flush urinals & stools

6/9/2009

8/28/2010

$

12,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Energy efficient water heaters

6/18/2009

8/21/2010

$

14,000

tt i m

d e t

ub

S

02262009

s t s

T O

-N

e u

q e R

Install 40 room motion sensors to control lighting

Submitted Requests - Not Approved

Route (Infrastructure Only)

627 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Alternative Education

Demolish existing building

6/9/2009

8/1/2009

$

15,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Automatic faucets

6/9/2009

8/10/2010

$

15,400

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New air conditioning in media center and computer labs

6/9/2009

8/1/2010

$

16,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Automatic faucets

6/9/2009

8/29/2010

$

16,800

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New outside light poles and lights (6)

6/9/2009

$

18,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Automatic hand dryers

6/9/2009

8/6/2010

$

20,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Transportation Bldg

Reconstruct (10) stormwater catch basins

6/9/2009

8/1/2009

$

20,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Automatic hand dryers

6/9/2009

8/2/2010

$

24,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New windows at original building

6/9/2009

8/1/2010

$

30,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

New air conditioning in cafeteria

6/9/2009

8/21/2010

$

35,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New lighting in (19) classrooms

6/9/2009

8/7/2010

$

40,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Asbestos removal

6/9/2009

8/5/2010

$

45,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New ceiling and lighting in media center

6/9/2009

8/9/2010

$

46,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Remodel industrial arts into alternative ed classroom

6/9/2009

8/17/2010

$

60,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New interior doors and hardware

6/9/2009

8/2/2010

$

65,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New electrical panels (10)

6/9/2009

8/9/2010

$

72,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Remodel (4) student toilet rooms; ADA upgrade

6/9/2009

8/4/2010

$

80,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Transportation Bldg

Custodial/ground equipment-alternative fuel

6/9/2009

8/1/2009

$

106,900

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Fire alarm system upgrade

6/9/2009

8/3/2010

$

134,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Kitchen serving lines, coolers, freezers, oven/range,dishwasher

6/9/2009

8/1/2010

$

150,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Skylights

6/9/2009

8/14/2010

$

200,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Skylights

6/9/2009

8/17/2010

$

200,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Windows

6/9/2009

8/19/2010

$

210,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Transportation Bldg

(3) new buses-alternative fuel

6/9/2009

8/1/2009

$

234,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Cafeteria addition of 1200 sf

6/9/2009

8/1/2009

$

234,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Remodel (2) classrooms into (1) new science room

6/9/2009

8/18/2010

$

240,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Transportation Bldg

HVAC - Geothermal

6/9/2009

8/13/2010

$

250,000

m b u

S

02262009

O N

R d

e t t

it

s

st

e u

eq

A T

Submitted Requests - Not Approved

PP

O R 8/10/2010

D VE

Route (Infrastructure Only)

628 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New roof at original building & insulation

6/9/2009

8/1/2009

$

325,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Windows

6/9/2009

8/22/2010

$

330,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New fire suppresssion system for entire building

6/9/2009

8/2/2010

$

370,200

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New (2) classroom addition of 2500 sf for All-Day Kindergarten

6/9/2009

8/1/2010

$

412,500

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Cafeteria/Band Room addition of 4533 sf

6/9/2009

$

630,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New (4) classroom addition of 4800 sf

6/9/2009

8/1/2010

$

740,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

New (4) classroom addition of 5000 sf

6/9/2009

8/16/2010

$

800,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New roofing (all except 2001 addition)

6/9/2009

8/11/2010

$

924,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Skylights

6/9/2009

8/18/2010

$

1,200,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

New metal roof

6/9/2009

8/20/2010

$

1,725,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

HVAC - Geothermal

6/9/2009

8/11/2010

$

2,500,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

HVAC - Geothermal

6/9/2009

8/12/2010

$

3,000,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

New floor and wall finish in music room

6/9/2009

8/8/2010

$

12,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Electrical service upgrade

6/9/2009

8/1/2009

$

25,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Fire alarm system upgrade

6/9/2009

8/1/2009

$

63,600

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Remodel existing life skills into general ed classrooms

6/9/2009

8/1/2009

$

110,500

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Extend parking lot to front of high school

6/9/2009

8/1/2010

$

136,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Remodel existing science labs (finishes, casework, mech, new window)

6/9/2009

8/1/2009

$

271,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Remodel cafeteria and kitchen/servery

6/9/2009

8/1/2010

$

302,400

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Parking lot-repair & expansion

6/9/2009

8/13/2010

$

378,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

New computers, servers, mobile labs, video projectors

6/9/2009

8/1/2009

$

608,040

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Water restrictive water softeners

6/9/2009

8/12/2010

$

7,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Energy efficient water heaters

6/14/2009

8/17/2010

$

10,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary School HVAC - Geothermal

6/9/2009

8/8/2010

$

1,500,000

02262009

m b u

O N

R d

e t t

it

s

st

e u

eq

A T

S

Submitted Requests - Not Approved

PP

O R 8/15/2010

D VE

Route (Infrastructure Only)

629 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lincoln Consolidated School District Zeeland Public Schools Zeeland Public Schools

Zeeland Public Schools

Project Name

Project Description

Start Date

Erecting, furnishing and equipping a new high school; partially remodeling, refurnishin and re-equipping existing school facilities; acquiring and installing education technology; developing and equipping outdoor physical education and athletic field an facilities, playfields and playgrounds; acquiring land for site purposes; and developing and improving sites? The following is for information purposes only: The estimated millage that will be levied for the proposed bonds in 2005, under current law, is .90 mil ($0.90 on each $1,000 of taxable valuation). The maximum number of years the bonds may be outstanding, exclusive of any refunding, will not exceed thirty (30) years. The estimated simple average annual millage anticipated to be required to retire this bond debt is 3.77 mills ($3.77 on each $1,000 of taxable valuation). 6/1/2009

O R

Funding Request

$

95,000,000

6/1/2009

8/1/2009

$

250,000

Zeeland Public Schools, ECC

Our early childhood center, which is home to over 350 early age students, is in need of renovation and building improvements. We have had this project on the "drawing" board for several years, yet have not been able to make the improvements through approval of a bond fund or other means of support. The existing Early Childhood Center needs new carpet, paint, some building modifications and replacement of the HVAC/Mechanical systems. These projects would be completed by local construction and contracting firms. 6/1/2009

8/1/2009

$

1,500,000

Fall 09

$

100,000

Lincoln Consolidated School District

Zeeland

Zeeland Public Schools

Zeeland

Zeeland Public Schools, Middle School

Repair an replacement of roofing at our two middle schools, which are due for completion the summer of 2009.

T O

P P A

N s

t s e

Alba Public Schools

Alba

Alba Public School-Multipurpose Room

Multipurpose room to be used for numerous activities, Title 1 projects, Special Education activities well as some musical instruction. Completiion of this energy efficient project will also allow for additional classroom space that is much needed in our current cramped quarters. Spring 09

Allegan Area Educational Service Agency

Allegan

Roof Replacement

Our countwide regional special education building needs the roof resurfaced so that it does not need to be completely replaced in a few years. 3/1/2009

60 days

$

115,000

Professional development computer lab used by all professional staff within Allegan and Van Buren county when professional development is be facilitated at the AAESA. Currenlty a lab does not exist so a make shift lab has to be created each day training occurs and the set up/break down is not efficient and does not allow for full functionalty of the technology needed to train highly qualified staff to educate our students. ASAP

60 days

$

200,000

Currently facilities are in place but the lab was never completed. The distrance learning lab would be used by all local district high school vocational students as well as MI-Works clients working on getting a GED or training in order to be qualified for new jobs. ASAP

60 days

$

10,000

The switches run the entire organization's technology resources. As the AAESA supports all local levels in a number of ways, the switches must be keep up to date and have to be replaced this upcoming fiscal year.

7/1/2009

8/1/2009

$

59,635

7/1/2009

8/1/2009

$

280,000

9/9/2009

9/1/2011

$

1,350,000

9/9/2009

9/1/2011

$

1,875,000

12/1/2010

$

6,125,000

Allegan Area Educational Service Agency Allegan Area Educational Service Agency Allegan Area Educational Service Agency

qu

d e t

e R

Professional Development computer training lab

Allegan

Allegan

tt i m

Distance Learning Lab

ub

Allegan

Technology Switches

Allegan Area Educational Service Agency Allegan Allendale Public School District Allendale Township Allendale Public School District Allendale Township

Phone System The organization phone system must be replaced becaue the system is expiring. Allendale Public Schools Wind Turbine for Power Generation Purchase of wind turbines to reduce reliance on fossil fuels (carbon offset). Allendale Public Schools Solar Energy at High Purchase solar energy panels for district buildings to reduce reliance on fossil fuels School (carbon offset) and to help supplement water heating.

Allendale Public School District Allendale Township

Allendale Public Schools District-wide Maintenance Facility

S

02262009

To purchase land and build district-wide maintenance and storage facility. Currently the district is paying rent to store equipment and supplies in a variety of rental spaces. 9/9/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

8/15/2012

Ypsilanti

Zeeland

Expected Completion Date

630 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Allendale Public School District Allendale Township

Allendale Public Schools Geothermal Mechanical System at allendale High School

Install energy efficient Geothermal heating/ cooling systems in Allendale High School to reduce our natural gas bill and also add cooling to a building that has limited cooling currently to improve the learning environment. 9/1/2009

Allendale Public School District Allendale Township

Allendale Public Schools New Options High School

Constuction of a new New Options Alternative High School to replace our aging and failing current 50 year old building which was purchased from a farm supply dealer. 9/1/2009

Allendale Public School District Allendale Township Allendale Public School District Allendale Township

Allendale Public Schools CO2 Sensors in all Educational Facilities District-wide Allendale Public Schools Bus Canopy

To upgrade the heating and cooling systems to be more energy efficient by controlling the amount of outside air entering the building based on occupancy rates. 9/9/2009 Construct enclosed canopy over school buses for cold starts in winter months and prolonging the longevity of the school buses 8/9/2009

Allendale Public School District Allendale Township Allendale Public School District Allendale Township

Install energy efficient lighting upgrades, timers, occupancy sensors, control systems, Allendale Public Schools Energy Upgrades and lightning protection system at Allendale High and upgrade all electrical systems to District Wide be more energy efficient. 9/1/2009 Allendale Public Schools Generators District- Purchase generators to provide back-up electricity for critical phone and technology wide for back-up power supply network gear for emergency situations. 7/9/2009

Alpena Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Ann Arbor Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools

Expected Completion Date

A T

12/10/2010

12/1/2010

$

8,320,000

D VE $

8,430,000

$

140,000

$

250,000

12/10/2010

$

875,000

9/9/2009

$

540,000

Dec, 2010

O R

PP

Funding Request

12/9/2009

Alpena

APS - Alpena High School

Storage Building - 4,800 sq. foot Pole Barn to accommodate stored items now stored in a variety of badly deteriorating small sheds and other outbuildings. 5/1/2009

7/31/2009

$

150,000

Ann Arbor

Ann Arbor

Upgrade district energy management system

6/1/2009

8/1/2009

$

632,000

Ann Arbor

Ann Arbor

District network switches and server replacements

6/1/2009

8/1/2009

$

1,500,000

Ann Arbor

Ann Arbor

District computer replacements for internet usage

6/1/2009

8/1/2009

$

5,600,000

Ann Arbor

Ann Arbor

District video on Demand Switches

6/1/2009

8/1/2009

$

200,000

Ann Arbor

Ann Arbor

District ADA signage update

6/1/2009

8/1/2009

$

250,000

Ann Arbor

Ann Arbor

ADA concrete work at 22 buildings - phase 2

6/1/2009

8/1/2009

$

409,343

Ann Arbor

Ann Arbor

ADA concrete work at 22 buildings - phase 3

6/1/2009

8/1/2009

$

463,082

Ann Arbor

Ann Arbor

Huron High Special ED, Theatre and Art room

6/1/2009

8/1/2009

$

600,000

Ann Arbor

Ann Arbor

ADA concrete work at 22 buildings - phase 1

6/1/2009

8/1/2009

$

695,343

Ann Arbor

Ann Arbor

Fire Alarm Systems

6/1/2009

8/1/2009

$

2,000,000

Ann Arbor

Ann Arbor

District ADA door harware update

6/1/2009

8/1/2009

$

3,000,000

Ann Arbor

Pioneer High E-wing West,Expand Café and Admin Office

12/1/2009

8/1/2010

$

1,350,000

Yale Public Schools/Avoca Elementary

New carpeting in classrooms & tile at wet areas

6/1/2009

8/1/2009

$

35,000

Yale Public Schools/Avoca Elementary

Improve drainage in playground

3/9/2009

8/1/2009

$

30,000

Yale Public Schools/Avoca Elementary

Exterior Solar lighting

4/9/2009

8/8/2009

$

50,000

Yale Public Schools/Avoca Elementary

Temperature controls upgrade

6/1/2009

8/1/2009

$

52,100

Yale Public Schools/Avoca Elementary

Uninterrupted Power Supply system

6/1/2009

8/1/2009

$

2,500

Yale Public Schools/Avoca Elementary

Emergency lighting upgrades

6/1/2009

8/1/2009

$

9,000

Ann Arbor Avoca/ Kenocee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township Avoca/ Kenockee Township

02262009

tt i m

d e t

ub

S

st

e u

q e R

s

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

631 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Avoca/ Kenockee Yale Public Schools Township Avoca/ Kenokee Yale Public Schools Township

Battle Creek Public Schools

Battle Creek Public Schools

Battle Creek Public Schools

Battle Creek Public Schools

Battle Creek Public Schools

Battle Creek Public Schools

Battle Creek Public Schools Madison Academy

Battle Creek

Battle Creek

Battle Creek

Battle Creek

Start Date

Surge supression for technology equipment

6/1/2009

8/1/2009

$

12,500

Yale Public Schools/Avoca Elementary

New doors and hardware in (12) locations

6/1/2009

8/1/2009

$

12,000

School District of the City of Battle Creek New Math / Science Center

New Math / Science center school will adapt an existing unoccupied museum building (former Cereal City Museum) in a prime downtown location to develop a state of the art center that will accommodate students from 15 different districts in 3 counties / program will focus on high tech science, engineering and mathematics as an integral part of the curriculum and incorporate local science and tech businesses in the curriculum development and mentoring of students / center will house successful program that provides math and science kits to programs across the country 5/1/2009

9/1/2010

$

26,000,000

School District of the City of Battle Creek Ann J. Kellogg Elementary School

New replacement elementary school for (K-8 Schoolwide Title I designation) Ann J. Kellogg School / existing 75 year old school is located closest to downtown core and has outlived its useful life / attendance area includes numerous "at-risk" students / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification 4/1/2009

7/1/2010

$

19,000,000

School District of the City of Battle Creek Coburn Elementary School

New replacement elementary school for (K-8 Schoolwide Title I designation) Coburn School / existing school is over 55 years old and has outlived its useful life / new school will allow numerous displaced students to return to their home school / attendance area includes numerous "at-risk" students due to high poverty area / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification 4/1/2009

7/1/2010

$

19,000,000

School District of the City of Battle Creek Dudley Elementary School

New replacement elementary school for (K-8 Schoolwide Title I designation) Dudley School / existing school is over 50 years old and has outlived its useful life / attendance area includes numerous "at-risk" students who obtained 100% proficiency on MEAP math / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification 4/1/2009

7/1/2010

$

19,000,000

New replacement elementary school for (K-8 Schoolwide Title I designation) Franklin School / existing school is over 30 years old and has outlived its useful life / new school will allow numerous displaced students to return to their home school / attendance area includes numerous "at-risk" students / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification 4/1/2009

7/1/2010

$

19,000,000

School District of the City of Battle Creek LaMora Park Elementary School

New replacement elementary school for (K-8 Schoolwide Title I designation) LaMora Park School / existing school is over 50 years old and has outlived its useful life / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification 4/1/2009

7/1/2010

$

19,000,000

School District of the City of Battle Creek Verona Elementary School Madison Academy

New replacement elementary school for (K-8 Schoolwide Title I designation) Verona School / existing school is over 90 years old and has outlived its useful life / attendance area includes numerous "at-risk" students due to high poverty area / new school will include innovative program supported with seamless technology / capacity = 600 students / designed to gain LEED Certification 4/1/2009 Acquisition of new school facility 4/1/2009

7/1/2010 5/1/2009

$ $

19,000,000 7,450,000

e t tt

i m

ub

S

Funding Request

Yale Public Schools/Avoca Elementary

School District of the City of Battle Creek Franklin Elementary School

Battle Creek

02262009

Project Description

T O

eq

N s

st

e u

Submitted Requests - Not Approved

O R

P P A

R d

Battle Creek

Battle Creek Burton

Project Name

Expected Completion Date

D VE

Route (Infrastructure Only)

632 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wexford-Missaukee ISD Wexford-Missaukee ISD

Project Name

Project Description

Start Date

Cadillac

Wexford Missaukee ISD

Construct a 2,500 square foot multi purpose meeting room on our campus. Currently all of our staff and/or students can not meet in any one place in our facilities. This room would be open for use by the community, as well as state and local groups. 9/1/2009

Cadillac

Wexford Missaukee ISD

Our parking lots require resurfacing to extend their useful life.

6/1/2009

6/1/2009

750,000

$

45,000

$

200,000

12/1/2010

$

5,900,000

12/1/2010

$

5,900,000

8/9/2009

$

7,604,600

8/9/2009

$

3,355,600

5/1/2009

12/1/2010

$

35,000,000

4/1/2009

9/1/2009

$

260,000

4/1/2009

9/1/2009

$

260,000

4/1/2009

9/1/2009

$

305,000

4/1/2009

9/1/2009

$

305,000

4/1/2009

9/1/2009

$

450,000

4/1/2009

9/1/2009

$

450,000

4/1/2009

9/1/2009

$

910,000

4/1/2009

9/1/2009

$

910,000

4/1/2009

12/1/2010

$

1,000,000

4/1/2009

12/1/2010

$

1,000,000

Cadillac

Wexford Missaukee ISD

Replace roof on special services building. Existing roof is well past expected useful life. On-going repair costs necessitate replacement of this roof. We hope to realize heating and cooling efficiencies with a new and better insulated roof system.

Plymouth-Canton Community Schools

Canton Township

PCCS - Salem High School remodeling

Remodel existing Salem High School to accommodate growing student population and add 6 additional classrooms/ improve science and technology

6/1/2009

Plymouth-Canton Community Schools

Canton Township

Plymouth Canton - Salem High School remodeling

Remodel existing Salem High School to accommodate growing student population and add 6 additional classrooms/ improve science and technology

6/1/2009

Plymouth Canton The Park - 3 High School Site

Renewable heat recovery, energy efficiency and "building intelligence" systems for heating/cooling, electrical and other utility savings. Renewable measures include daylighting, solar thermal heating, cooling & water heating, wind & photovoltatic power generation. 5/9/2009

Plymouth Canton - Middle School sites

Renewable heat recovery, energy efficiency and "building intelligence" systems for heating/cooling, electrical and other utility savings. Renewable measures include daylighting, solar thermal heating, cooling & water heating, wind & photovoltatic power generation. 5/1/2009

Plymouth-Canton Community Schools

Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools

Canton Township

Canton Township

Canton Township Canton Township Canton Township Canton Township Canton Township

Canton Township

S

e t t

it

m b u

Canton Township

R d

8/31/2009

O R

P P A

New replacement middle school school for Central Middle School / existing school is over 60 years old and has outlived its useful life / new school will include innovative program supported with seamless technology / capacity = 900 students / designed to Plymouth Canton - New Middle School gain LEED Certification Replace existing asphalt paving / improve storm water drainage & management / PCCS - Tonda Elementary Site remodeling improve student safety Plymouth Canton - Tonda Elementary Site Replace existing asphalt paving / improve storm water drainage & management / remodeling improve student safety Replace existing asphalt paving / improve storm water drainage & management / PCCS - Bentley Elementary Site remodeling improve student safety Plymouth Canton - Bentley Elementary Site Replace existing asphalt paving / improve storm water drainage & management / remodeling improve student safety Replace existing asphalt paving / improve storm water drainage & management / PCCS - Gallimore Elementary Site remodeling improve student safety/ New bus drop off Plymouth Canton - Gallimore Elementary Site Replace existing asphalt paving / improve storm water drainage & management / remodeling improve student safety/ New bus drop off Replace existing asphalt paving / improve storm water drainage & management / PCCS - Isbister Elementary Site remodeling improve student safety/ New parent drop off Plymouth Canton - Isbister Elementary Site Replace existing asphalt paving / improve storm water drainage & management / remodeling improve student safety/ New parent drop off Replace and add additional security equipment District wide and add card reader PCCS - All District facilities locks. Replace and add additional security equipment District wide and add card reader Plymouth Canton - All District facilities locks.

u q e

Canton Township

Canton Township

N s

t s e

Canton Township

Canton Township

T O

12/31/2010

Funding Request

$

Wexford-Missaukee ISD

Plymouth-Canton Community Schools

Expected Completion Date

8/31/2009

D VE

Canton Township

PCCS - Bentley Elementary remodeling

Replace existing windows and partial mechanical system for energy efficiency

4/1/2009

9/1/2009

$

1,100,000

Canton Township

PCCS - Tonda Elementary remodeling Plymouth Canton - Bentley Elementary remodeling

Replace existing windows and partial mechanical system for energy efficiency

4/1/2009

9/1/2009

$

1,100,000

Replace existing windows and partial mechanical system for energy efficiency

4/1/2009

9/1/2009

$

1,100,000

Canton Township

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

633 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Plymouth-Canton Community Schools Canton Township

Plymouth-Canton Community Schools

Plymouth-Canton Community Schools

Plymouth-Canton Community Schools

Plymouth-Canton Community Schools

Canton Township

Canton Township

Canton Township

Canton Township

Project Description

Start Date

Expected Completion Date

Project Name Plymouth Canton - Tonda Elementary remodeling

Replace existing windows and partial mechanical system for energy efficiency

4/1/2009

9/1/2009

PCCS - Elementary School sites

Renewable heat recovery, energy efficiency and "building intelligence" systems for heating/cooling, electrical and other utility savings. Renewable measures include daylighting, solar thermal heating, cooling & water heating, wind & photovoltatic power generation. 5/1/2009

8/9/2009

Plymouth Canton - Elementary School sites

Renewable heat recovery, energy efficiency and "building intelligence" systems for heating/cooling, electrical and other utility savings. Renewable measures include daylighting, solar thermal heating, cooling & water heating, wind & photovoltatic power generation. 5/1/2009

PCCS - All District facilities

Computers throughout the District are currently being updated and replaced. Average life of 3000 computers in the District is apprx 8 years. Replacement schedule can not keep up with current State funding levels for the District. 4/1/2009

PCCS - Middle School sites

Renewable heat recovery, energy efficiency and "building intelligence" systems for heating/cooling, electrical and other utility savings. Renewable measures include daylighting, solar thermal heating, cooling & water heating, wind & photovoltatic power generation. 5/1/2009

A T

O N

$

1,100,000

D VE $

2,028,000

$

2,028,000

12/1/2010

$

3,100,000

8/9/2009

$

3,355,600

8/9/2009

$

7,604,600

O R

PP

Funding Request

8/9/2009

Plymouth-Canton Community Schools

Canton Township

PCCS The Park - 3 High School Site

Renewable heat recovery, energy efficiency and "building intelligence" systems for heating/cooling, electrical and other utility savings. Renewable measures include daylighting, solar thermal heating, cooling & water heating, wind & photovoltatic power generation. 5/9/2009

Plymouth-Canton Community Schools

Canton Township

Plymouth Canton - All District facilities

Aging bus fleet without funding to keep replacement cycle on target for student safety. The fleet of 130 buses should be on a 13 year per bus replacement cycle 4/1/2009

9/1/2010

$

13,000,000

PCCS - New Middle School

New replacement middle school school for Central Middle School / existing school is over 60 years old and has outlived its useful life / new school will include innovative program supported with seamless technology / capacity = 900 students / designed to gain LEED Certification 5/1/2009

12/1/2010

$

35,000,000

Capac Community School District

Purchase and update technology infrastructure and supplies/equipment, which would include: access points, servers, student computer, fiber, wireless laptop carts, uninterupible power supply, network switches, video surveillance system, graphing calculators, projection systems, smartboards, multimedia presentation solution 8/1/2009

1/1/2010

$

1,101,000

Replacement of 188,121 sq feet of roofs on existing building, install roof top HVAC unit with controls an ductwork, replace hot water heaters and controls, replace windows, install sound panels, install roof top unit with controls, add flooring for band room, construct new gym entrance, replace football field lights, install artificial turf on football field, district wide door replacement 8/1/2009

9/1/2010

$

1,919,593

Capac Community School District

A building of approximately 14, 000 sq. feet that would provide community and school activity space for performing arts and recreational endeavors. The building would include a stage and seating for fine arts. The project would include geo-thermal heat and wind turbine electricity generation. 8/1/2009

9/1/2010

$

6,000,000

Capac Community School District

Wrestling/Activity Room- An additional room of approximately 5,000 sq feet that will provide a permanent space for wrestling practices. Wresters currently practice in the school cafeteria, a potentially unhealthy practice. We will include geo- thermal and wind turbine energy technology. 8/1/2009

9/1/2010

$

600,000

Capac Community School District

Science Labs Renovations- The current 1970's vintage science labs will be updated, modernized and expanded to meet current teaching and learning standards including technology. 8/1/2009

9/1/2010

$

1,000,000

Plymouth-Canton Community Schools

Capac Community School District

Capac Community School District

Capac Community School District

Capac Community School District Capac Community School District

Canton Township

Capac

Capac Community School District

ub

Capac

Capac

Capac

02262009

S

t s e

u q e

R d

e t tt

i m

Capac

s

Submitted Requests - Not Approved

Route (Infrastructure Only)

634 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Capac Community School District Caro Community Schools Caro Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Capac

Capac Community School District

Middle School gymnasium to provide adequate physical education venue for students in grades 5-7. Current gym is a 1933, 40' by 60' building that does not provide sufficient space for physical education and wellness activities. This project would include geo-thermal heat and potentially wind turbine electrical production got energy efficiency. 8/1/2009

Caro

Caro Community Schools-Schall

New Boilers

Caro

Schall

New Boilers Build facility for students with severe emotional impairments - This facility would house students from nine local school districts (county) - K-12 program - 6000 sq. ft. 6/1/2009 Early Childhood/Infant Evaluation Center - to include audiology, speech, ot, pt, psych, ssw and GPGS, Early On, Great Start, ECIC, and Preschool 6/1/2009

9/1/2010

Funding Request

D VE $

1,500,000

$

150,000

$

150,000

5/31/2011

$

1,200,000

5/31/2011

$

1,600,000

7/20/2009

9/1/2009

$

125,000

6/1/2008

12/31/2008

$

554,000

7/1/2010

6/30/2011

$

250,000

7/1/2010

6/30/2011

$

300,000

7/1/2010

6/30/2011

$

400,000

7/1/2010

6/30/2011

$

950,000

6/1/2009

8/9/2009

$

5,625

O R

Tuscola ISD

Caro

Tuscola ISD Caro Community Schools Lakewood Public Schools Climax-Scotts Community Schools Climax-Scotts Community Schools Climax-Scotts Community Schools Climax-Scotts Community Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools

Caro

Tuscola Intermediate School District, EI Building Tuscola Intermediate School District, Early Childhood building

Caro

Caro Community Schools

Replace bleacher footings and upgrade safety

Clarksville

Lakewood Clarksville Elem

Addition to Clarksville Elementary

Climax

Climax-Scotts

Implementation of Energy Efficiency Program (District-Wide)

Climax

Climax-Scotts

Technology Infrastructure Upgrades (District-Wide)

Climax

Climax-Scotts

Air Conditioning for Possible Year-Round School Implementation (3 Buildings)

Climax

Climax-Scotts

Auxillary Gym For Physical Education & Health Related Classes

Clinton Township

Chippewa Valley - Clinton Valley Elem

Upgrade temperature control system

Clinton Township

Chippewa Valley - Erie Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Clinton Township

Chippewa Valley - Huron Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Clinton Township

Chippewa Valley - Miami Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Clinton Township

Chippewa Valley - Administration Building

Upgrade temperature control system

6/1/2009

8/1/2009

$

5,625

Clinton Township

Chippewa Valley - Algonquin Middle School

Upgrade temperature control system

6/1/2009

8/9/2009

$

8,125

Clinton Township

Chippewa Valley - Wyandot Middle School

Upgrade temperature control system

6/1/2009

8/9/2009

$

8,125

Chippewa Valley - Ottawa Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

13,250

Chippewa Valley - CVHS 9th Grade Center

Upgrade temperature control system

6/1/2009

8/9/2009

$

15,750

Chippewa Valley - Mohegan High School

Upgrade temperature control system

6/1/2009

8/1/2009

$

22,125

Chippewa Valley - Cherokee Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

26,250

Clinton Township

Chippewa Valley - Chippewa Valley High

Upgrade temperature control system

6/1/2009

8/1/2009

$

45,000

Clinton Township

Chippewa Valley - Administration Building

Replace windows

4/1/2009

4/1/2009

$

62,500

Clinton Township

Chippewa Valley - Erie Elementary

Replace interior and exterior doors

6/9/2009

8/9/2009

$

9,625

m b u

Clinton Township Clinton Township

S

Clinton Township Clinton Township

02262009

e u

eq

O N

R d

e t t

it

st

s

A T

Submitted Requests - Not Approved

PP

Route (Infrastructure Only)

635 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Climax-Scotts Community Schools Comstock Park Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Clinton Township

Chippewa Valley - Administration Building

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Cherokee Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Clinton Valley Elem

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Erie Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Huron Elementary

Install card access

6/9/2009

$

13,875

Clinton Township

Chippewa Valley - Miami Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Ottawa Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Algonquin Middle School

Install card access

6/9/2009

8/9/2009

$

13,875

Clinton Township

Chippewa Valley - Wyandot Middle School

Install card access

6/9/2009

8/9/2009

$

17,500

Clinton Township

Chippewa Valley - Huron Elementary

Create secure front entrance

6/9/2009

8/9/2009

$

18,750

Clinton Township

Chippewa Valley - Ojibwa Elementary

Create secure front entrance

6/9/2009

8/9/2009

$

18,750

Clinton Township

Chippewa Valley - CVHS 9th Grade Center

Install card access

6/9/2009

8/9/2009

$

18,750

Clinton Township

Chippewa Valley - CVHS 9th Grade Center

Replace interior and exterior doors

6/9/2009

8/9/2009

$

22,500

Clinton Township

Chippewa Valley - Administration Building

Replace interior doors

6/9/2009

8/9/2009

$

31,250

Clinton Township

Chippewa Valley - Chippewa Valley High

Replace site concrete

6/9/2009

8/9/2009

$

31,250

Clinton Township

Chippewa Valley - Mohegan High School

Install additional parking lot lighting

6/9/2009

8/9/2009

$

33,750

Clinton Township

Chippewa Valley - Chippewa Valley High

Install card access

6/9/2009

8/9/2009

$

34,625

Clinton Township

Chippewa Valley - Administration Building

Replace exterior doors

6/9/2009

8/9/2009

$

41,250

Clinton Township

Chippewa Valley - Administration Building

Install new exterior sign

6/9/2009

8/9/2009

$

62,500

Clinton Township

Chippewa Valley - Administration Building

Repave parking lot

6/9/2009

8/9/2009

$

281,250

Chippewa Valley - Cherokee Elementary

Replace roof

6/9/2009

8/9/2009

$

396,853

Chippewa Valley - Chippewa Valley High

Replace portion of roof

6/9/2009

8/9/2009

$

570,158

Chippewa Valley - Miami Elementary

Replace roof

6/9/2009

8/9/2009

$

738,843

Chippewa Valley - Clinton Valley Elem

Replace roof

6/9/2009

8/9/2009

$

806,784

Clinton Township

Chippewa Valley - Administration Building

Replace roof

4/1/2009

8/9/2009

$

442,605

Cllimax

Climax-Scotts Comstock Park Public Schools (CPPS) North Kent High School

Hook Up Village Water to Intermediate School

7/1/2009

9/30/2009

$

100,000

Upgrade lighting from T-12 to T-8 ballasts to improve energy efficiency.

April of 2009

April of 2009

$

3,950

m b u

Clinton Township Clinton Township

S

Clinton Township

Clinton Township

Comstock Park, MI

02262009

st

e u

eq

s

O N

R d

e t t

it

A T

Submitted Requests - Not Approved

PP

O R 8/9/2009

D VE

Route (Infrastructure Only)

636 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Parchment School District Cooper Township Parchment School District Cooper Township Dearborn City School District Dearborn

Project Name Parchment - North Elementary

Project Description North Elementary is in need of a new single membrane roof for the whole building. The last one was done in a bond issue of 1998.

Start Date

Expected Completion Date

Funding Request

3/1/2009

4/9/2009

$

250,000

4/1/2009

$

60,000

Transportation

North Elementary is in need of a boiler replacement 4/1/2009 Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, and roof. 545 days

$

2,188,670

$

3,575,330

tbd

$

3,652,000

tbd

$

3,831,300

Parchment - North Elementary

tbd

D VE

Dearborn City School District

Dearborn

Cotter Preschool

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

Dearborn City School District

Dearborn

DuVall Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

Dearborn City School District

Dearborn

Long Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

Dearborn City School District

Dearborn

Howard Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

3,984,200

Dearborn City School District

Dearborn

Becker Elemenrtary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

3,993,000

Dearborn City School District

Dearborn

Nowlin Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

4,076,600

Dearborn City School District

Dearborn

River Oaks Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

4,180,000

Dearborn City School District

Dearborn

Lindbergh Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

tbd

$

4,186,600

Dearborn City School District

Dearborn

Howe Montessori

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

4,609,000

Dearborn City School District

Dearborn

Haigh Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

5,016,000

Dearborn City School District

Dearborn

Oakman Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

tbd

$

5,137,000

Dearborn City School District

Dearborn

McDonald Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

5,881,810

Dearborn City School District

Dearborn

Ten Eyck Administration Building

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

6,019,200

Dearborn City School District

Dearborn

Whitmore Bolles Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

tbd

$

6,141,300

Dearborn City School District

Dearborn

Maples Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

6,655,000

Dearborn City School District

Dearborn

Snow Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

6,838,700

02262009

T O

d e tt

t i m

S

ub

st

e u

q e R

Submitted Requests - Not Approved

O R

P P A

N s

tbd

Route (Infrastructure Only)

637 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Dearborn City School District

Project Name

Project Description

Start Date

Expected Completion Date

Dearborn

William Ford Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

Dearborn

Miller Elementary

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

Dearborn

Henry Ford Elementary

Tear down , demolition, and rebuild of the old school.

tbd

Dearborn City School District

Dearborn

Maintenance and Operations Building

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

Dearborn City School District

Dearborn

Salina Intermediate

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

Dearborn City School District

Dearborn

OL Smith Middle School

Dearborn City School District

Dearborn

Dearborn City School District

Dearborn City School District Dearborn City School District

Funding Request

$

6,842,000

D VE $

7,722,000

$

8,347,900

$

8,800,000

tbd

$

10,824,000

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

14,124,000

Woodworth Middle School

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

tbd

$

15,334,000

Dearborn

Stout Middle School

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

17,149,000

Dearborn City School District

Dearborn

Bryant Middle School

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

19,904,500

Dearborn City School District

Dearborn

Lowrey K-8

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

tbd

$

24,380,400

Dearborn City School District

Dearborn

Dearborn High School

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

25,776,850

Dearborn City School District

Dearborn

Edsel Ford High School

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roof, parking lots. 545 days

tbd

$

26,571,820

Dearborn City School District

Dearborn

Fordson High School

Renovation and upgrades of all building infrastructure, including classrooms, windows hallways, offices, HVAC systems, roofs, parking lots. 545 days

tbd

$

40,984,130

We would like to install energy efficient lights in the two elementary gyms as this is used all of the school day and most evenings for school classes and athletic practices Delton Kellogg Elementary School Gym Lights and community events. The bulbs are longer lasting, and will use less energy. 7/1/2009

7/30/2009

$

18,000

We would like to install energy efficient lights in the HS gym as this is used all of the school day and most evenings for school classes and athletic events. The bulbs are longer lasting, and will use less energy. 7/1/2009

7/30/2009

$

21,000

7/1/2009

9/1/2009

$

128,000

Currently neither of these building have air conditioning which makes it impossible to have summer school in either building. We would like to explore the concept of year Delton Kellogg Elementary and Middle School round school, and that is out of the question without air conditioning. Would use energy efficient products for this project. 7/1/2009 Air conditioning

9/1/2009

$

3,970,000

m b u

Delton-Kellogg School District Delton

Delton-Kellogg School District Delton

Delton-Kellogg School District Delton

02262009

A T

O N

A new environmental science academy. This would be the creation of a brand new, state-of-the-art Environmental Science Academy comprised of renovated shop, Delton Kellogg School District Environmental science lab, and computer lab/class spaces. This would involve the total Science Academy reconfiguration of approximately 6,700 sq.ft.

Submitted Requests - Not Approved

O R

PP

R d

Delton Kellogg High School Gym Lights

S

eq

s

st

e u

e t t

it

Delton-Kellogg School District Delton

545 days

tbd

Route (Infrastructure Only)

638 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Delton-Kellogg School District Delton

The 1936 portion of the elementary building has outlived its useful life as a school facility and would cost more to remodel it than to construct more efficient space. New space would prove to be energy efficient, educationally efficient and safer for Delton Kellogg Eliminating the 1936 Portion of students. We would add 20,000. sq feet of new building. We would lower the the Elementary Building and adding an operating cost by reducing the outlived space by 40,000 sq. feet, in turn this would efficient addition to the remaining half. save cost to our district operating costs. 8/2/2009

Delton-Kellogg School District Delton

Replacing the districts point of sale workstations in all lunch rooms. Also, replacing the server used for food service. All of these items are outdated and need upgrading. Delton Kellogg Food service computers/server This new system would also be energy efficient. 6/15/2009

Delton-Kellogg School District Delton

Delton-Kellogg School District Delton

$

31,000

7/1/2009

$

49,008

8/31/2009

$

70,000

This project involves updating our 7-8 year old laptops with energy star compliant laptops. With energy star compliant laptops we will reduce our power consumption. Our current laptops are three years past the normal replacement rate. Most of the laptops will not hold a charge. As our laptops are no longer under warranty, and our repair costs have increased. Laptops provide the ability for continual integration with the regular and core subject areas which allow students to use technology in a more practical manner that is relevant to the topics and subjects being taught. It will also allow teachers to integrate the technology with the core subject areas as opposed to learning technology solely in a vacuum. The core areas are reinforced and the use of technology are taught simultaneously. Our current laptops are in high, constant demand and not ALL students are able to learn and use the technology that is needed for their next step in education. 5/1/2009

6/30/2009

$

90,000

Delton Kellogg District Bike and Pedistrian Access

3 buildings that require bike racks, pathways and snow melted sidewalks and entrances. This would allow us to accommodate and promote physical fitness and reduction in the use of motorized vehicles. (The snow melting could be pulled directly from the geothermal energy that was requested.) 6/1/2009

8/28/2009

$

225,000

Delton Kellogg Middle School Building Security/Energy

Reconfiguring the front entrance to create a secure entry point for the building. Electronic devices for all exits and foyers for energy consideration. This will make the school safe and secure, it will also be energy efficient and save operating dollars. 6/1/2009

12/30/2009

$

350,000

Delton Kellogg Elementary Playground Equipment

The creation of an upper and lower elementary playgrounds comprised of grading, drainage, surfacing, fencing and play equipment. Preliminary inspections have stated that our playground is unsafe. This new equipment would provide a safe place for our students and it would be eco-friendly. 6/15/2009

8/15/2009

$

350,000

Delton Food Service

Delton Kellogg Server Virtualization

The goal of this project is to consolidate twelve physical servers to three new servers. In the process of consolidation we will implement a virtual data center. With this consolidation, we will be able to reduce power consumption by as much as 80 percent, reduce the associated carbon footprint, and create a Green virtual data center. A virtual data center will allow us to increase our server uptime and to create a rapid, reliable & cost-effective disaster recovery solution. Other benefits include reduction of IT cost while increasing the efficiency, utilization, and flexibility of current assets. 4/1/2009

Delton-Kellogg School District Delton

Delton-Kellogg School District Delton

02262009

d e tt

it

m b u

S

q e R

N s

st

Submitted Requests - Not Approved

O R

P P A

In a effort to make our department more energy efficient by replacing 10 hot carts used for holding hot foods at proper temperature with Energy Star equipment. Current hot carts are over 15 years old and constantly waste utilities. Also believe we should replace 7 milk coolers that are not Energy star rated with energy star milk coolers to help save utilities. Current milk coolers are all older than 10 years. Replace 2 reach in coolers and 2 reach in freezers with energy star equipment. 6/1/2009

Delton Kellogg Laptop Replacement

Delton-Kellogg School District Delton

D VE

4,000,000

T O

9/30/2010

Funding Request

$

e u

Delton-Kellogg School District Delton

Expected Completion Date

8/15/2009

Route (Infrastructure Only)

639 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Reconfiguring the front entrance to create a secure entry point for the building. Electronic devices for all exits and foyers for energy consideration. This will make the school safe and secure, it will also be energy efficient and save operating dollars. 6/1/2009

Delton-Kellogg School District Delton

Delton Kellogg High School Building Security/Energy

Delton-Kellogg School District Delton Delton-Kellogg School District Delton Delton-Kellogg School District Delton

Delton Kellogg Elementary Building Security/Energy

Delton-Kellogg School District Delton

Auto Shop, Wood Shop and Metal Shop labs to be modernized to improve the ability Delton Kellogg High School Three Tech Labs to teach and learn, energy efficient machinery, and safety for students. 6/1/2009

Delton-Kellogg School District Delton

Delton Kellogg District Learn Labs

Modernization to classrooms of 45 learning labs for the purpose of improving teachers ability to teach as well as the students ability to learn. This will also upgrade the classrooms to a greater energy efficient standard. 6/1/2009

Delton-Kellogg School District Delton

Delton Kellogg School District Geothermal Heating and Cooling

We would like to install geothermal heating and cooling throughout the district. This is environmentally advantageous as well as budget wise. We would reduce greatly the use of oil and gas with this project. Also, this would allow for year round education. 6/1/2009

Delton Kellogg District Wide Wireless

400,000

$

450,000

$

750,000

8/2/2010

$

950,000

8/2/2010

$

1,200,000

8/2/2010

$

2,700,000

9/30/2009

$

10,550,000

This project will provided wireless access district wide. The following list the benefits of having a wireless campus. · Access for students from all locations. · Ability for students and teachers to use their own laptops and access information, projects and work from any location. · Increased accessibility within the classroom. · Ability for outside presenters to have easy access to technology. · Avoids limitations of infrastructure and current electrical access. · Flexibility with equipment. 4/1/2009

8/31/2009

$

150,000

Delton Kellogg 21st Century Classroom

Upgrading classroom technology providing a document camera and an interactive whiteboard for every classroom. Some of the benefit of having a document camera and an interactive white board in classrooms. Document Camera • Provides ability for “real life” presentation for all students. For example, microscopes, lab experiments, photos, items that are not in a paper/document format. • No need for transparencies, lower daily cost. • Converts and presents material directly from computer. This includes the ability to present material that would not otherwise be able to be viewed by all students simultaneously. • Presentation materials can be magnified for better inspection, explanation and evaluation by the entire class. • Time that is required for presentation reduced, so more time spent in additional instruction. • Having document cameras in all classrooms provides the ability for same level of instruction in all classes to ALL students, not just a select or chosen few. Interactive White Board • Interactive ability for teachers and student. • Ability to save presentation for later demonstrations or for students that may miss the presentations. • Timeframe and prep2/24/2009

4/1/2009

$

165,848

Delton Kellogg Phone System

Voice Over IP phone system (VOIP). We currently do not have our own phone system. This new phone system would provide every teacher a telephone line in their classroom. This would allow for better communication, safety in the classroom, and would prove to be more efficient. 5/1/2009

7/15/2009

$

200,000

Delton Kellogg 1-to-1 laptop program

The 1-to-1 laptop program provides every High School student with a laptop. This would allow for an equal opportunity for every student to access their assignments, school projects as well as the web for educational purposes.

6/30/2009

$

385,000

d e tt

t i m

ub

Delton-Kellogg School District Delton

Delton-Kellogg School District Delton

Delton-Kellogg School District Delton

02262009

S

T O

s t s

-N

Submitted Requests - Not Approved

12/30/2009

O R

P P A

e u

q e R

12/30/2009

Funding Request

$

Reconfiguring the front entrance to create a secure entry point for the building. Electronic devices for all exits and foyers for energy consideration. This will make the school safe and secure, it will also be energy efficient and save operating dollars. 6/1/2009 Alternative energy source of Photovoltaic panels to provide energy for Middle School Delton Kellogg Middle School Photovoltaic lighting to save electrical energy dollars. 6/1/2009 Delton Kellogg High School Renewable Wind Alternative energy source of renewable wind energy to provide power for High School Energy lighting and to save energy dollars spent. 6/1/2009

Delton-Kellogg School District Delton

Expected Completion Date

5/1/2009

8/2/2010

D VE

Route (Infrastructure Only)

640 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Dewitt Public Schools Hopkins Public Schools Saugatuck Public Schools Dundee Community Schools

Elk Rapids Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Yale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools

DeWitt

Project Name

Project Description

Start Date

DeWitt Public Schools – Junior High

renovate classrooms to meet current educational needs 6/1/2010 Older portion of existing building needs roof replacement, with addition of insulation to Hopkins Public Schools Sycamore Elementary improve energy efficiency 6/7/2010 Saugatuck Public Schools, Douglas Elementary New Roof for Douglas Elementary 6/1/2009 key card access tying time cards to electronic reporting, eliminating paper and Dundee Community Schools increasing building security 3/15/2009

Dorr township Douglas Dundee

Elk Rapids Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township Emmett/ Emmett Township

Cherryland Middle School

The project would include replacing 130 laptop computers that are currently deployed in a "1-to-1" manner within our 6th grade. This means every 6th-grade student has a laptop assigned to them every day. These laptops will be eligible for replacement in 1 year. They were originally attained from the federal "freedom-to-learn" program. Pricing is based upon a turnkey machine inclusive of sofware and features identical to the current machines. Funding for replacement of these laptops is not foreseeable. 6/1/2010

Yale Public Schools/Farrell Elementary

Exterior Solar lighting

Yale Public Schools/Farrell Elementary

New sanitary sewer connection/removal of lagoon

Yale Public Schools/Farrell Elementary

New doors and hardware

Yale Public Schools/Farrell Elementary

Temperature controls upgrade

Yale Public Schools/Farrell Elementary

Uninterrupted Power Supply system

Yale Public Schools/Farrell Elementary Yale Public Schools/Farrell Elementary

Ferndale

FPS-Grant Early Childhood Center

Ferndale

FPS-High School/Middle School campus

Ferndale

FPS- Coolidge Intermediate School

Ferndale

FPS - Jefferson Adult Education Center

Ferndale

FPS - Jackson Center

Yale Public Schools/Farrell Elementary

tt i m

FPS-High School/Middle School campus

Ferndale

Ferndale

d e t

ub

Ferndale

Ferndale

FPS- Kennedy School

S

FPS - University High School

FPS-Jackson Center

Ferndale

FPS-High School/Middle School campus

Ferndale

FPS - Taft Center

02262009

Expected Completion Date

Funding Request

9/30/2010

$

425,195

8/31/2010

$

225,000

$

1,000,000

$

25,000

6/30/2010

$

130,000

9/1/2009 4/15/2009

O R

D VE

P P A 4/9/2009

8/9/2009

$

50,000

3/9/2009

8/1/2009

$

360,000

6/1/2009

8/1/2009

$

20,000

6/1/2009

8/1/2009

$

44,000

6/1/2009

8/1/2009

$

2,250

Emergency lighting upgrades

6/1/2009

8/1/2009

$

9,000

Surge suppression system for technology equipment

6/1/2009

8/1/2009

$

12,500

New computers, server, mobile lab, video projectors 6/1/2009 Add Air conditioning at all classrooms. A/C to be added to existing newer unit ventilators 6/1/2009 New corridor enclosure for exterior passage between buildings. Enclosed corridor for protection from the weather 7/1/2009

8/1/2009

$

197,280

1/1/2010

$

250,000

2/1/2010

$

375,000

Mechanical controls system replacement Replace existing asphalt paving / improve storm water drainage & management / improve student safety

6/1/2009

12/1/2010

$

75,000

6/1/2009

11/1/2010

$

100,000

Replace existing asphalt paving / improve storm water drainage & management. New exterior scrolling sign at main entrance to High School and main entrance to Middle School

6/1/2009

11/1/2010

$

100,000

6/1/2009

12/1/2010

$

125,000

Replace existing boiler at gymnasium and locker rooms Parking lot expansion / improve storm water drainage & management / improve student safety

6/1/2009

12/1/2010

$

125,000

6/1/2009

11/1/2010

$

150,000

12/1/2010

$

250,000

11/1/2010

$

250,000

11/1/2010

$

300,000

s t s

T O

-N

e u

q e R

Corridor and Classroom floor mud-jacking to raise sinking floor slabs due to poor soils below slab on grade. Slabs sinking below finished floor elevations, improve student safety 6/1/2009 Courtyard improvements, including drainage systems, irrigation, overgrown tree removal, concrete walks and plaza 6/1/2009 Parking lot expansion / improve storm water drainage & management / improve student safety 6/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

641 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools Ferndale Public Schools

Ferndale

Telephone system update @ all buildings 6/9/2009 Playground improvements including new play structures, safety, paths and barrier free 6/1/2009 FPS - All District Elementary School facilities accessibility Replace and add security equipment District wide and add card reader locks to all FPS - All District facilities entry locations in district 4/1/2009 Replacement of pool filtration system, piping and drain upgrades to meet code FPS-High School/Middle School campus requirements 6/1/2009

Ferndale

FPS - All District facilities

Replace classroom furniture throughout district facilities

Ferndale Public Schools

Ferndale

FPS - All District facilities

Aging bus fleet without funding to keep replacement cycle on target for student safety. The fleet of 22 buses should be on a 13 year per bus replacement cycle 4/1/2009

Ferndale

FPS - All District facilities

Computers throughout the District are currently in need of being updated and replaced. Average life of 3000 computers in the District is approx 8 years. Replacement schedule can not keep up with current State funding levels for the District.

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Balance HVAC system. Energy saving project.

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Balance HVAC system. Energy saving project.

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Replace roof exhaust fans and controls. Energy saving project.

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Replace roof exhaust fans and controls. Energy saving project.

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Ferndale Public Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools

Ferndale

Project Name

Project Description

Start Date

FPS - All District facilities

Ferndale Ferndale

$

600,000

$

1,000,000

$

1,000,000

$

1,500,000

9/1/2010

$

2,200,000

1/1/2010

O R 12/1/2010

D VE $

3,500,000

6/1/2009

9/1/2009

$

17,000

6/1/2009

9/1/2009

$

20,000

6/1/2009

9/1/2009

$

25,000

6/1/2009

9/1/2009

$

27,500

6/1/2009

9/1/2009

$

38,800

6/1/2009

9/1/2009

$

45,000

New Ceilings and Lights in Corridors. Energy saving project.

6/1/2009

9/1/2009

$

47,500

Replace existing Temperature controls to DDC controls. Energy saving project.

6/1/2009

9/1/2009

$

50,000

Replace existing Temperature controls to DDC controls. Energy saving project.

6/1/2009

9/1/2009

$

50,000

9/1/2009

$

75,000

9/1/2009

$

332,000

9/1/2009

$

405,000

Flat Rock Schools, MI --Simpson Middle

Replace Gym lighting. Energy saving project. 6/1/2009 Window Replacement, insulation replacement and structural repairs. Energy saving project. 6/1/2009 Window Replacement, insulation replacement and structural repairs. This is an energy saving project. 6/1/2009 Window Replacement, insulation replacement and structural repairs. Energy saving project. 6/1/2009

9/1/2009

$

660,000

Flat Rock Schools, MI --Barnes Elem.

Renovate small toilet rooms for ADA

6/1/2009

10/1/2009

$

308,000

Flat Rock Schools, MI --Bobcean Elem.

Renovate small toilet rooms for ADA

6/1/2009

10/1/2009

$

375,000

Flat Rock Schools, MI --Simpson Middle

Replace roof exhaust fans and controls

6/1/2009

9/1/2009

$

14,000

s t s

T O

-N

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Flat Rock

11/1/2010

12/1/2010

Flat Rock Schools, MI --Barnes Elem.

tt i m

d e t

ub

S

500,000

6/1/2009

Flat Rock

Flat Rock

$

P P A

Flat Rock

Flat Rock

Funding Request

12/9/2009

12/1/2010

4/1/2009

Balance HVAC system. Energy saving project. Rework Gym ductwork amd omstall frequency drives and fans. Energy Saving Flat Rock Schools, MI --Flat Rock High School Project.

Flat Rock

Expected Completion Date

e u

q e R

Flat Rock

Flat Rock Schools, MI --Flat Rock High School Install CO2 monitoring on large HVAC equipment

6/1/2009

9/1/2009

$

25,000

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

New Pad Mounted Transformer

6/1/2009

9/1/2009

$

35,000

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Update Distribution Panels

6/1/2009

9/1/2009

$

45,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

642 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Flat Rock Community Schools Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Update Distribution Panels

6/1/2009

9/1/2009

$

45,000

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Replace AC in Cafeteria

6/1/2009

9/1/2009

$

50,000

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Widen and Replace Classroom Entry Doors and Frames for ADA

6/1/2009

9/1/2009

$

52,500

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Renovate Music and Art Rooms

6/1/2009

9/1/2009

$

53,000

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Widen and Replace Classroom Entry Doors and Frames for ADA

6/1/2009

$

73,150

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Widen and Replace Classroom Entry Doors and Frames for ADA

6/1/2009

10/1/2009

$

80,850

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Replace Exterior Doors

6/1/2009

9/1/2009

$

82,500

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Install Compute Centers and Whiteboards in classrooms.

6/1/2009

9/1/2009

$

112,000

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Install Computer Centers and Whiteboards in classrooms.

6/1/2009

9/1/2009

$

112,000

Flat Rock

Flat Rock Schools, MI -- Admin Bldg.

Replace Gym lighting

6/1/2009

9/1/2009

$

112,500

Flat Rock

Flat Rock Schools, MI --Flat Rock High School Replace Gym lighting

6/1/2009

9/1/2009

$

112,500

Flat Rock

Flat Rock Schools, MI --Flat Rock High School Install Whiteboards in classrooms.

6/1/2009

9/1/2009

$

125,000

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Update domestic waterline system

6/1/2009

9/1/2009

$

240,000

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Install Computer Centers and Whiteboards in classrooms.

6/1/2009

9/1/2009

$

263,000

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Roof Replacement

6/1/2009

9/1/2009

$

303,000

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Renovate Health and Band Rooms

6/1/2009

9/1/2009

$

348,000

Flat Rock

Flat Rock Schools, MI --Barnes Elem.

Asbestos Abatement

6/1/2009

9/1/2009

$

450,000

Flat Rock

Flat Rock Schools, MI --Bobcean Elem.

Asbestos Abatement

6/1/2009

9/1/2009

$

490,000

Flat Rock

Flat Rock Schools, MI --Flat Rock High School Replace EIFS

6/1/2009

9/1/2009

$

550,000

Flat Rock

Flat Rock Schools, MI --Simpson Middle

Asbestos Abatement

6/1/2009

9/1/2009

$

630,000

6/1/2009

9/1/2009

$

1,000,000

Flat Rock Schools, MI -- Admin Bldg.

Asbestos abatement and demolition of approximately 70,000 sq. ft. of building Construct 10 new Early Childhood classrooms and support areas to replace demolished Early childhood classrooms.

9/1/2009

12/31/2010

$

3,100,000

PHASD Keewahdin

Temperature controls - replace as equipment is replaced

6/10/2009

8/15/2009

$

82,225

PHASD Keewahdin

Univents - replace original units in 12 classrooms

6/10/2009

8/15/2009

$

234,000

PHASD

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2009

8/15/2009

$

286,454

m b u

Flat Rock

Flat Rock Schools, MI -- Admin Bldg.

Flat Rock Fort Gratiot Fort Gratiot Fort Gratiot

S

Fort Gratiot

O N

R d

e t t

it

st

e u

eq

s

A T

PP

O R 9/1/2009

D VE

Fort Gratiot

PHASD Keewahdin

Boilers, piping: replace Bryan boilers - new pumps, piping, flues and gas train

6/10/2009

8/15/2009

$

325,000

Fort Gratiot

PHASD

Boilers: replace old, including piping

6/10/2009

8/15/2009

$

422,500

02262009

Fort Gratiot

Submitted Requests - Not Approved

Route (Infrastructure Only)

643 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Fort Gratiot

PHASD

Fort Gratiot

Fort Gratiot

PHASD

Fort Gratiot

Fort Gratiot

Project Description

Start Date

Expected Completion Date

Funding Request

Univents: replace throughout classrooms Windows: total removal at east & west wings and replacement entrances: replace ext. w/ alum framing and FRP doors w/ new hardware

6/10/2009

8/15/2009

$

741,000

6/10/2009

8/31/2009

$

754,000

Port Huron PHASD Keewahdin

Temperature controls - replace as equipment is replaced

6/10/2009

8/15/2009

$

82,225

Fort Gratiot

Port Huron PHASD

AHU ventilation: replace roof top units in media center

6/10/2009

8/15/2009

$

130,000

Fort Gratiot

Port Huron PHASD Keewahdin

Exterior Building: Roofing - replace 1984 roofing

6/10/2009

$

178,480

Fort Gratiot

Port Huron PHASD Keewahdin

Univents - replace original units in 12 classrooms

6/10/2009

$

234,000

Fort Gratiot

Port Huron PHASD

Fort Gratiot

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2009

8/15/2009

$

286,454

Fort Gratiot

Port Huron PHASD

Fort Gratiot

Univents: replace throughout classrooms

PP

8/15/2009

6/10/2009

8/15/2009

$

741,000

Fort Gratiot

Port Huron PHASD Keewahdin

Electrical service, distribution: replace MDP and branch panels

6/10/2009

8/31/2009

$

116,636

Fort Gratiot

Port Huron PHASD

T Edison

Electrical service, distribution: update distribution and branch panels

6/10/2009

8/31/2009

$

126,100

Fort Gratiot

Port Huron PHASD

Fort Gratiot

6/10/2009

8/31/2009

$

260,413

Fort Gratiot

Port Huron PHASD

Fort Gratiot

Electrical service, distribution: replace distribution equipment and panels Windows: total removal at east & west wings and replacement entrances: replace ext. w/ alum framing and FRP doors w/ new hardware

6/10/2009

8/31/2009

$

754,000

Fort Gratiot

Port Huron PHASD

Fort Gratiot

Exterior Building: Roofing: replace roofing over science rooms

6/10/2010

8/15/2010

$

67,275

Fort Gratiot

PHASD Keewahdin

6/10/2010

8/31/2010

$

100,100

Fort Gratiot

Port Huron PHASD Keewahdin

8/31/2010

$

100,100

Fort Gratiot

PHASD

8/31/2010

$

172,575

Fort Gratiot

Port Huron PHASD

8/31/2010

$

172,575

Fort Gratiot

PHASD

8/15/2010

$

173,388

Fort Gratiot

Port Huron PHASD

8/15/2010

$

173,388

PHASD

Fort Gratiot Fort Gratiot Fort Gratiot Fort Gratiot

T Edison

T Edison

T Edison

T Edison

Port Huron PHASD Keewahdin Port Huron PHASD

Fort Gratiot

PHASD

02262009

e t t

it

Fort Gratiot

O N

T Edison

eq

Windows: replace original windows at east elevation near front entrance; entrances: replace exterior entrancees w/ alum framing, FRP doors with new hardware 6/10/2010 Windows: replace window systems in original building; Entrances: replace HM doors with alum framing/FRP 6/10/2010 Windows: replace window systems in original building; Entrances: replace HM doors with alum framing/FRP 6/10/2010 Temperature controls: replace pneumatic controls with DDC as mechanical equipmen is replaced 6/10/2010 Temperature controls: replace pneumatic controls with DDC as mechanical equipmen is replaced 6/10/2010

R d

PHASD Keewahdin PHASD

st

e u

T Edison

T Edison

Port Huron PHASD

S

s

A T

Windows: replace original windows at east elevation near front entrance; entrances: replace exterior entrancees w/ alum framing, FRP doors with new hardware

T Edison

m b u

Fort Gratiot

Fort Gratiot

T Edison

O R 8/15/2009

D VE

Univents: replace 18 units 1973 and older

6/10/2010

8/15/2010

$

351,000

Univents: replace 18 units 1973 and older Parking lot: surface mill & overlay asphalt in south & west parking areas; sidewalks: spot concrete replacement to eliminate trip hazards Parking lot: mill and asphalt overlay exiting lot; sidewalks: spot replacement of concrete Parking lot: surface mill & overlay asphalt in south & west parking areas; sidewalks: spot concrete replacement to eliminate trip hazards Parking lot: mill and asphalt overlay exiting lot; sidewalks: spot replacement of concrete

6/10/2010

8/15/2010

$

351,000

5/1/2009

11/1/2009

$

48,490

5/1/2009

11/1/2009

$

117,208

5/1/2009

11/1/2009

$

48,490

5/1/2009

11/1/2009

$

117,208

4/1/2009

4/1/2010

$

39,000

Keyless entry, cameras, security

Submitted Requests - Not Approved

Route (Infrastructure Only)

644 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Port Huron Area School District Fort Gratiot Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Project Name

Project Description

Start Date

Expected Completion Date

PHASD Keewahdin

Keyless entry, cameras, security

4/1/2009

4/1/2010

Fort Gratiot

PHASD

sidewalks: replace under north canopies @ east & west wings, improve classroom exists with concrete stoops; site: ponding issue near green belt island @ turnaround loop south side 4/1/2009

6/1/2009

Fort Gratiot

Port Huron PHASD

Exterior Building: Brick Repairs / Tuckpointing / Caulk Joints

4/1/2009

6/1/2009

Fort Gratiot

Port Huron PHASD Keewahdin

Exterior Building: Foundations, wall repair - brick repair and tuckpointing

4/1/2009

6/1/2009

Fort Gratiot

Port Huron PHASD

Fort Gratiot

Exterior Building: Foundations, wall repair

4/1/2009

Fort Gratiot

Port Huron PHASD

T Edison

Fort Gratiot

Port Huron PHASD Keewahdin

Keyless entry, cameras, security

Fort Gratiot

Port Huron PHASD

Fort Gratiot

Fort Gratiot

Port Huron PHASD

T Edison

Fort Gratiot T Edison

Funding Request $

39,000

D VE $

65,000

$

13,000

$

19,500

$

26,000

4/1/2010

$

39,000

4/1/2009

4/1/2010

$

39,000

sidewalks: replace under north canopies @ east & west wings, improve classroom exists with concrete stoops; site: ponding issue near green belt island @ turnaround loop south side 4/1/2009

6/1/2009

$

65,000

Keyless entry, cameras, security

P P A 4/1/2009

T O

O R 6/1/2009

Fraser Public Schools Fraser

Fraser Public Schools/Fraser High School

Fraser Public Schools Fraser

Fraser Public Schools/Fraser High School

Exterior Building: Roofing: replace 50% of roofing 18+ yrs old Install an ozone pool cleaner to reduce the amount of chlorine needed to keep pool safe from bacteria's and other health hazards. New bleachers to replace older sets to bring them up to date and current code requirements.

Fraser Public Schools Fraser

Fraser Public Schools/Fraser High School

Repair existing roof to make it water tight giving it an additional 10 years use.

Fraser Public Schools Freeland Community School District Freeland Community School District Gibraltar School District Gibraltar School District Pinckney Community Schools Pinckney Community Schools Pinckney Community Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools

Fraser

Fraser Public Schools/Fraser High School

Install new tile in all hallways to replace the old glazed tile over 35 years old

Freeland

Freeland Community School District

Renovation of unusable lockerrooms

Freeland

Gibraltar

Freeland Community School District Gibraltar School District Shumate Middle School Gibraltar School District High School and Middle School

Hamburg

Pinckney Community Schools - District-wide

Addtiion of four (4) classrooms to the Freeland Learning Center Replace current urinals in all bathrooms with Green Waterless Units (10 units necessary) Oct, 2009 Install solar panels at both the High School and Middle School for energy savings and teaching tool to students Oct, 2009 Technology Upgrade and Replacement. New equipment would be energy star rated and set up to power down when not in use. 6/1/2009

Hamburg

Pinckney Community Schools - District-wide Asbestos Abatement Pinckney Community Schools - Transportation Facility New building equipped with energy efficient heating, cooling and lighting systems.

6/1/2009

10/1/2009

$

325,000

6/1/2009

9/1/2010

$

4,400,000

Bus Garage

Roof Replacement

5/1/2009

Jun 2009

$

126,000

Dick. East

Roof Replacement

5/1/2009

6/1/2009

$

219,600

Horizon

Roof Replacement

5/1/2009

6/1/2009

$

72,000

Maint. Garage

Roof Replacement

5/1/2009

Jun 2009

$

78,000

Hamtramck

Early Child.

Roof Replacement

5/1/2009

7/1/2009

$

219,600

Hamtramck

Kocs.

Roof Replacement

5/1/2009

6/1/2009

$

334,800

Gibraltar

m b u

Hamburg Twp Hamtramck Hamtramck Hamtramck Hamtramck

02262009

S

e u

eq

6/10/2010

8/15/2010

$

267,963

6/12/2009

9/1/2009

$

50,000

6/12/2009

9/1/2009

$

60,000

4/1/2009

6/1/2009

$

90,000

6/12/2009 As soon as possible As soon as possible

9/1/2009 As soon as possible As soon as possible

$

300,000

$

80,000

$

600,000

Dec, 2009

$

36,000

Dec, 2009

$

330,000

6/1/2011

$

10,000,000

R d

e t t

it

s t s

-N

Submitted Requests - Not Approved

Route (Infrastructure Only)

645 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Hamtramck

Comm. Center

Roof Replacement

5/1/2009

7/1/2009

$

348,000

Hamtramck

Hamt. High

Roof Replacement

5/1/2009

6/1/2009

$

822,859

Hamtramck

Hamt. High

Plastering and Painting

9/1/2009

11/1/2009

$

102,000

Hamtramck

Hamt. High

Replacement of Mansard roof

5/1/2009

6/1/2009

$

594,000

Hamtramck

Dick. East

Plastering and Painting

7/1/2009

$

60,000

Hamtramck

Keyworth Stadium

Bleacker Repair with Cement Repair(safety issue)

6/1/2009

$

520,000

Hamtramck

Keyworth Stadium

Replacement of Artificial Turf

6/1/2010

8/1/2010

$

690,000

Hamtramck

Holb.

Entrance Doors

PP

8/1/2009

7/1/2009

8/1/2009

$

14,400

Hamtramck

Early Child.

Enterance Doors

7/1/2009

8/1/2009

$

21,600

Hamtramck

Holb.

Plastering and Painting

7/1/2009

8/1/2009

$

24,000

Hamtramck

Dick. East

Security Cameras

7/1/2009

8/1/2009

$

28,800

Hamtramck

Early Child.

Security Cameras

7/1/2009

8/1/2009

$

28,800

Hamtramck

Holb.

Security Cameras

6/1/2009

7/1/2009

$

28,800

Hamtramck

Horizon

Security Cameras

7/1/2009

8/1/2009

$

28,800

Hamtramck

Maint. Garage

Security Cameras

6/1/2009

7/1/2009

$

28,800

Hamtramck

Bus Garage

Security Cameras

6/1/2009

7/1/2009

$

28,800

Hamtramck

Admin.Build.

Secutity Cameras

7/1/2009

Aug 2009

$

28,800

Hamtramck

Early Child.

Plastering and Painting

7/1/2009

8/1/2009

$

30,000

Hamtramck

Early Child.

Upgrade Fire Alarm System

6/1/2009

7/1/2009

$

30,000

Hamtramck

Comm. Center

Door Replacment

7/1/2009

8/1/2009

$

36,000

Replace Fire Alarm System

8/1/2009

Oct. 2009

$

42,000

Dick. East

Asbestos Abatement

7/1/2009

8/1/2009

$

48,000

Early Child.

Asbestos Abatement

6/1/2009

7/1/2009

$

48,000

Holb.

Fire Alarm System

8/1/2009

9/1/2009

$

48,000

Early Child.

Heating Controls

7/1/2009

10/1/2009

$

48,000

Hamtramck

Holb.

Asbestos Abatement

7/1/2009

8/1/2009

$

48,800

Hamtramck

Kosc.

Plastering and Painting

7/1/2009

8/1/2009

$

72,000

Dick. East

Hamtramck Hamtramck Hamtramck Hamtramck

02262009

eq

S

O N

R d

e t t

it

s

st

e u

m b u

Hamtramck

A T

Submitted Requests - Not Approved

O R 8/1/2009

D VE

Route (Infrastructure Only)

646 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools Hamtramck Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Hamtramck

Admin.Build.

Roof Replacement

5/1/2009

6/1/2009

$

72,000

Hamtramck

Comm. Center

Heating Controls

7/1/2009

10/1/2009

$

96,000

Hamtramck

Holb.

Heating Controls

7/1/2009

10/1/2009

$

114,000

Hamtramck

Early Child.

Window Replacement

8/1/2009

9/1/2009

$

199,200

Hamtramck

Holb.

Window Replacement

8/1/2009

$

330,000

Hamtramck

Hamt. High

Electrol Main Distribution Panel

7/1/2009

$

360,000

Hamtramck

Holb.

Upgrade Electrol System

6/1/2009

8/1/2009

$

360,000

Hamtramck

Dick. Easrt

Heating Controls

PP

9/1/2009

7/1/2009

Oct. 2009

$

420,000

Hamtramck

Hamt. High

Asbestos Abatement

7/1/2009

8/1/2009

$

480,000

Hamtramck

Dick. East

Window Replacement

8/1/2009

9/1/2009

$

564,000

Hamtramck

Hamt. High

Heating Controls

7/1/2009

9/1/2009

$

570,000

Hamtramck

Kosc.

Ventilation and Heating Controls

7/1/2009

Oct. 2009

$

660,000

Hamtramck

Hamt. High

Window Replacement

8/1/2009

9/1/2009

$

1,257,600

Hamtramck

Entrance Doors

7/1/2009

7/1/2009

$

78,000

Hastings Hastings Hastings Hastings Hastings Hastings Hastings Hastings Hastings Hastings Hastings

Hamt. High Barry ISD Professional Development Upgrades Barry ISD Security Upgrades Barry ISD Tech for Students plan Barry ISD Security Upgrades Barry ISD Safety for Children project Barry ISD Energy Conservation plan BISD Security Upgrades BISD Safety for Children project BISD Energy Conservation plan Barry ISD BISD Security Upgrades BISD Energy Conservation plan

Bathroom addition Safety Doors/Locks Adaptive Technology for Special Needs' classrooms Safety Doors/Locks New Playground Plumbing upgrades Safety Doors/Locks New Playground Energy Efficient Window/Controllable Thermostats Safety Doors/Locks Plumbing upgrades

Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009 Aug. 2009

Jan. 2010 Sept. 2009 Sept. 2009 Sept. 2009 Oct. 2009 Oct. 2009 Sept. 2009 Oct. 2009 Nov. 2009 Sept. 2009 Oct. 2009

$ $ $ $ $ $ $ $ $ $ $

88,000 50,000 30,000 30,000 35,000 65,000 30,000 35,000 40,000 50,000 65,000

Tri County Area Schools

Howard City

Tri County Area Schools-Edgerton Upper Elementary

3 Computer Learning Labs, 9 Smart Board for Instruction, 9 Projector Systems, 275 Student Response Modules, 9 Audio Systems, 1 Distance Learning Labs

2009 Summer

2009 Fall

$

225,000

Tri County Area Schools

Howard City

Tri County Area Schools-Sand Lake Elementary

4 Computer Learning Labs, 19 Smart Board for Instruction, 19 Projector Systems, 450 Student Response Modules, 19 Audio Systems, 1 Distance Learning Labs

2009 Summer

2009 Fall

$

325,000

Tri County Area Schools

Howard City

Tri County Area SchoolsMacNaughtonElementary

5 Computer Learning Labs, 22 Smart Board for Instruction, 22 Projector Systems, 500 Student Response Modules, 22 Audio Systems, 1 Distance Learning Labs

2009 Summer

2009 Fall

$

400,000

Tri County Area Schools

Howard City

Tri County Area Schools-High School

6 Computer Learning Labs, 28 Smart Board for Instruction, 28 Projector Systems, 800 Student Response Modules, 28 Audio Systems, 2 Distance Learning Labs

2009 Summer

2009 Fall

$

455,000

Tri County Area Schools

Howard City

Tri County Area Schools-Middle School

5 Computer Learning Labs, 29 Smart Board for Instruction, 29 Projector Systems, 650 Student Response Modules, 29 Audio Systems, 1 Distance Learning Labs

2009 Summer

2009 Fall

$

475,000

Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD Barry ISD

d e tt

ub

S

02262009

t i m

A T

q e R

e u

st

s

O N

Submitted Requests - Not Approved

O R 9/1/2009

D VE

Route (Infrastructure Only)

647 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Tri County Area Schools Howard City

Howell Public Schools Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Kalamazoo Public School District Parchment School District Kalamazoo Public School District Kalamazoo Public School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Project Name

Project Description

Tri County Area Schools

Start Date

Expected Completion Date

2009 Summer

2009 Fall

Howell, MI

howell public schools:the elementary bldgs of southwest,challenger,latson and the transportation bldg parking lot renovations

Broadband Fiber Throughout District

6/1/2009

8/1/2009

Kalamazoo

Kalamazoo Public Milwood Elementary

Replace existing lighting with energy efficient fluorescent lighting

6/15/2009

9/1/2009

Kalamazoo

Kalamazoo Public Lincoln Elementary Kalamazoo Public Maple Street Magnet Middle

Replace existing lighting with energy efficient fluorescent lighting

6/15/2009

9/1/2009

Replace existing exterior lighting with energy efficient lighting

5/1/2009

Install security cameras Add one computer lab with new computers and energy efficient flat screen monitors (School currently does not have a computer lab)

4/15/2009

Kalamazoo

Kalamazoo Public Milwood Middle Kalamazoo Public Vine Dual Language Elementary

Kalamazoo

Kalamazoo Public Northglade Elementary

Replace existing lighting with energy efficient fluorescent lighting

Kalamazoo

Kalamazoo Public Northglade Elementary

Replace existing lighting with energy efficient fluorescent lighting

Kalamazoo Kalamazoo

Kalamazoo Public Washington Elementary Kalamazoo Public Maple Street Magnet Middle

Kalamazoo

Kalamazoo Public Hillside Middle

Kalamazoo Township

Parchment Northwood Elementary

Kalamazoo twp Kalamazoo twp

Kalamazoo Public Indian Prairie Elementary Kalamazoo Public MLKing-Westwood Elementary

Kimball

Port Huron PHASD Kimball

Kimball

PHASD Kimball

Kimball

Port Huron PHASD Kimball

Kimball

PHASD Kimball

Kimball

Port Huron PHASD Kimball

Funding Request $

D VE

500,000

$

230,000

$

131,600

$

22,580

$

25,200

9/1/2009

$

95,000

7/15/2009

9/30/2009

$

37,200

6/15/2009

12/1/2009

$

131,292

6/15/2009

9/1/2009

$

140,000

Replace existing lighting with energy efficient fluorescent lighting

5/1/2009

9/1/2009

$

19,600

Install security cameras

4/15/2009

9/1/2009

$

95,000

Install security cameras Northwood pre-primary programming entrance is in need of renovation for security reasons.

4/15/2009

9/1/2009

$

95,000

3/1/2009

4/1/2009

$

50,000

Replace existing lighting with energy efficient fluorescent lighting

5/1/2009

12/1/2009

$

434,565

Replace existing exterior lighting with energy efficient lighting Exterior Building: Roofing - replace western portion of 2nd floor along w/ new gutter system Windows: replace glazing system at gym, lower custodial office and 1st & 2nd toilet room windows at NW portion of building Windows: replace glazing system at gym, lower custodial office and 1st & 2nd toilet room windows at NW portion of building

5/1/2009

9/1/2009

$

25,200

6/10/2009

8/15/2009

$

123,776

6/10/2010

8/31/2010

$

38,025

6/10/2010

8/31/2010

$

38,025

Univents: replace within the media center and staff lounge areas

6/10/2010

8/31/2010

$

39,000

6/10/2010

8/31/2010

$

39,000

6/10/2010

8/31/2010

$

59,800

6/10/2010

8/31/2010

$

86,840

Port Huron PHASD Indian Woods

Univents: replace within the media center and staff lounge areas Electrical service, distribution: new panels associated with new boilers, mechanical systems Windows: replace existing system w/ new framing and insulated glass; entrances: replace framing and doors with FRP & insulated glass units Windows: replace existing system w/ new framing and insulated glass; entrances: replace framing and doors with FRP & insulated glass units

6/10/2010

8/31/2010

$

86,840

Port Huron PHASD Indian Woods

Boilers & hydronic piping: replace (scheduled for 2018)

6/10/2010

8/31/2010

$

403,000

Kimball

Port Huron PHASD Indian Woods

8/31/2010

$

416,000

Kimball

PHASD Kimball

AHU ventilation: replace roof top units at office, MC and cafeteria areas (includes ductwork, electrical, controls, minor architectural); fnas: exhaust and controls for lower grades clrm TR areas 6/10/2010 Boilers, piping: replace w/ hot water boilers for complete new system, re-pipe hydronic lines w/in boiler room 6/10/2010

8/31/2010

$

481,000

Kalamazoo Kalamazoo

tt i m

ub

Kimball

Port Huron PHASD Kimball

Kimball Kimball Kimball

02262009

d e t

PHASD Indian Woods

S

T O

s t s

P P A

-N

e u

q e R

Submitted Requests - Not Approved

O R 9/1/2009

Route (Infrastructure Only)

648 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District North Huron School District North Huron School District

Location City or Township

Kimball

Port Huron PHASD Indian Woods

Project Description Parking lot: surface mill and overlay asphalt 50% of SE parking area; misc patching & ADA ramps @ bus loop & parking lot Parking lot: surface mill & overlay asphalt in bus loop, southern drive; replace concrete sections for safety and ADA ramps Parking lot: surface mill and overlay asphalt 50% of SE parking area; misc patching & ADA ramps @ bus loop & parking lot Parking lot: surface mill & overlay asphalt in bus loop, southern drive; replace concrete sections for safety and ADA ramps

Kimball

PHASD Indian Woods

Keyless entry, cameras, security

4/1/2009

Kimball

PHASD Kimball

Keyless entry, cameras, security

4/1/2009

Kimball

Port Huron PHASD Kimball

Exterior Building: Foundations: repair due to ground water seepage in tunnel to W & S form boiler room; wall repair: brick repair & tuckpointing west wall of 2 story 4/1/2009

Kimball

Port Huron PHASD Indian Woods

Exterior Building: Foundations, wall repair: repair bump-outs at UV louver locations 4/1/2009

6/1/2009

$

23,400

Kimball

Port Huron PHASD Indian Woods

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Kimball

Port Huron PHASD Kimball

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Kinde

North Huron

Replacement of Elem Roof

6/30/2009

7/30/2009

$

150,000

Kinde

North Huron

elementary parking lot replacement

7/1/2009

8/1/2009

$

75,000

Lake City

LCAS Elem

Construction of a new 89,626 square feet K-5 elementary building in a rural northern Michigan community consisting of 60% free and reduced students. Several requests for a bond proposal have been unsuccessful despite the need for a better environmen for the elementary students. The existing building was established in 1947 and is unable to provide the educational setting needed to meet today's requirements. The new building would be constructed utilizing current technology for heating and lighting thereby allowing the district to operate more efficiently, economically and healthier. 4/1/2010

9/1/2011

$

19,310,000

Lake Odessa

Lakewood West Elementary

Renovation of West Elementary

6/1/2010

12/31/2010

$

2,366,000

Lakeport

PHASD Lakeport

Windows, entrances: replace all exterior doors / FRMs 11 doors

6/10/2009

8/31/2009

$

71,500

Lakeport

PHASD Lakeport

8/31/2009

$

93,243

Port Huron PHASD Lakeport

Electrical service, distribution: new MDP and panels 6/10/2009 AHU ventilation: new AHU rooftop units at stage area; replace existing exhaust fans in toilet rooms 6/10/2009

8/15/2009

$

133,900

Port Huron PHASD Lakeport

Windows, entrances: replace all exterior doors / FRMs 11 doors

6/10/2009

8/31/2009

$

71,500

Port Huron PHASD Lakeport

Electrical service, distribution: new MDP and panels

6/10/2009

8/31/2009

$

93,243

PHASD Lakeport

Univents: replace 3 unit vents in 1975 portion of building

6/10/2010

8/31/2010

$

58,500

Port Huron PHASD Lakeport

Univents: replace 3 unit vents in 1975 portion of building

6/10/2010

8/31/2010

$

58,500

Lakeport

PHASD Lakeport

Temperature controls: complete upgrade of pneumatic controls with DDC controls

6/10/2010

8/31/2010

$

128,213

Lakeport

Port Huron PHASD Lakeport

Temperature controls: complete upgrade of pneumatic controls with DDC controls

6/10/2010

8/31/2010

$

128,213

Kimball

Project Name PHASD Kimball

Kimball

PHASD Indian Woods

Kimball

Port Huron PHASD Kimball

s t s

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

sidewalks: 5/1/2009

11/1/2009

$

83,980

5/1/2009

11/1/2009

$

172,025

5/1/2009

11/1/2009

$

83,980

5/1/2009

11/1/2009

$

172,025

$

39,000

P P A

4/1/2010

$

39,000

6/1/2009

$

22,750

sidewalks: sidewalks: sidewalks:

T O

-N

O R 4/1/2010

D VE

e u

Lake City Area School District Lakewood Public Schools Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

itt

m b u

Lakeport Lakeport Lakeport Lakeport Lakeport

02262009

d e t

S

q e R

Submitted Requests - Not Approved

649 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Lawrence Public School District Lawrence Public School District

Location City or Township

Project Name

Project Description

Start Date

Lakeport

Port Huron PHASD Lakeport

Lakeport

PHASD Lakeport

Lakeport

Port Huron PHASD Lakeport

Lakeport

PHASD Lakeport

Lakeport

Port Huron PHASD Lakeport

Lakeport

Port Huron PHASD Lakeport

Lawrence

Lawrence Public Schools

Lawrence

Lawrence Public Schools

Keyless entry, cameras, security 4/1/2009 Replace old district boilers and heat ventilators with energy efficient boiler and heating system 7/1/2010 Expand and install kitchen cooking and cleaning facilities in the elementary cafeteria. Presently no such area for the elementary school. 10/1/2009

Lawrence Public Schools

Expand elementary gym area for classes and to put in lockerroom facilities and rest rooms in that facility. Energy efficient lighting and heating for the project.

Lawrence Public Schools South Lyon Community Schools - South Lyon East High School South Lyon Community Schools - South Lyon East High School

Lawrence Public School District Lawrence Lawrence Public School District Lawrence South Lyon Community Schools Lyon Twsp. South Lyon Community Schools Lyon Twsp. Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township Chippewa Valley Schools Macomb Township

02262009

$

403,000

11/1/2009

$

109,738

$

109,738

$

39,000

$

13,000

PP

4/1/2010

$

39,000

9/1/2010

$

250,000

6/1/2010

$

500,000

3/1/2010

9/1/2010

$

3,250,000

Expand parking facilities for safer and more efficient traffic flow. 7/1/2009 Construct a second (auxilliary) gym for the high school to meet student growth and to provide equity with other high school 9/15/2009 Classroom Expansion: Provide additional classrooms to meet student growth projections 9/15/2009

9/1/2009

$

100,000

8/24/2011

$

5,000,000

8/24/2011

$

12,000,000

Chippewa Valley - Cheyenne Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Chippewa Valley - Fox Elementary

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Upgrade temperature control system

6/1/2009

8/9/2009

$

5,625

Upgrade temperature control system

6/1/2009

8/9/2009

$

16,250

Chippewa Valley - Dakota High School

Replace plumbing fixtures w/ low flow

6/1/2009

8/1/2009

$

112,500

Chippewa Valley - Iroquois Middle School

Replace interior and exterior doors

6/9/2009

8/9/2009

$

11,250

Chippewa Valley - Cheyenne Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Chippewa Valley - Fox Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Chippewa Valley - Mohawk Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Chippewa Valley - Ojibwa Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Chippewa Valley - Shawnee Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Chippewa Valley - Sequoyah Elementary

Install card access

6/9/2009

8/9/2009

$

13,875

Chippewa Valley - Dakota High School

Replace garage doors

6/9/2009

8/9/2009

$

15,000

Chippewa Valley - Ojibwa Elementary Chippewa Valley - Shawnee Elementary

d e t

Chippewa Valley - Iroquois Middle School

tt i m

ub

Boilers, piping: replace 22 yr old boilers and hydronic piping in boiler room 6/10/2010 Parking lot: mill & asphalt overlay for main lot ; sidewalks: misc walk replacement & exterior ramp for building entry 5/1/2009 Parking lot: mill & asphalt overlay for main lot ; sidewalks: misc walk replacement & exterior ramp for building entry 5/1/2009

Funding Request

8/31/2010

Chippewa Valley - Mohawk Elementary

S

Expected Completion Date

Keyless entry, cameras, security 4/1/2009 Exterior Building: Foundations, wall repair: brick repair, tuckpointing at various areas around building @ 1991 addition 4/1/2009

11/1/2009

A T

st

e u

q e R

s

O N

Submitted Requests - Not Approved

4/1/2010

O R 6/1/2009

D VE

Route (Infrastructure Only)

650 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Chippewa Valley Schools Utica Community Schools Manton Consolidated Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools Marcellus Community Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Macomb Township

Chippewa Valley - Cheyenne Elementary

Create secure front entrance

6/9/2009

8/9/2009

$

18,750

Macomb Township

Chippewa Valley - Seneca Middle School

Install card access

6/9/2009

8/9/2009

$

18,750

Macomb Township

Chippewa Valley - DHS 9th Grade Center

Install card access

6/9/2009

8/9/2009

$

18,750

Macomb Township

Chippewa Valley - Iroquois Middle School

Replace shower heads

6/9/2009

8/9/2009

$

18,750

Macomb Township

Chippewa Valley - Fox Elementary

Replace exterior doors

6/9/2009

$

20,313

Macomb Township

Chippewa Valley - Iroquois Middle School

Install card access

6/9/2009

8/9/2009

$

20,750

Macomb Township

Chippewa Valley - Sequoyah Elementary

Create secure front entrance

6/9/2009

8/9/2009

$

31,250

Macomb Township

Chippewa Valley - Shawnee Elementary

Create secure front entrance

6/9/2009

8/9/2009

$

31,250

Macomb Township

Chippewa Valley - Fox Elementary

Install additional security lighting

6/9/2009

8/9/2009

$

31,250

Macomb Township

Chippewa Valley - Dakota High School

Install card access

6/9/2009

8/9/2009

$

34,625

Macomb Township

Chippewa Valley - Dakota High School

Replace interior doors

6/9/2009

8/9/2009

$

45,000

Macomb Township

Chippewa Valley - Dakota High School

Masonry and metal rework to address leaks

6/9/2009

8/9/2009

$

62,500

Macomb Township

Chippewa Valley - Dakota High School

Replace auditorium sound system

6/9/2009

8/9/2009

$

125,000

Macomb Township

Chippewa Valley - Dakota High School

LCCE classroom renovations

6/9/2009

8/9/2009

$

187,500

Macomb Twp

Utica Community Schools

Replace the existing boilers

June '10

A T

st

s

e u

O N

PP

O R 8/9/2009

D VE

August '10

$

500,000

Light and switch retrofitting

Two months after funds are appropriated One month

$

61,400

HS Gym Lighting / Energy Savings

6/1/2009

6/1/2011

$

13,200

ES Gym / Energy

6/1/2009

6/1/2011

$

14,200

q e R

Manton

Manton Consolidated Schools

Marcellus

Marcellus Community School - HS

Marcellus

Marcellus Community School - ES

Marcellus

Marcellus Community School - HS

HS Library Lighting/ Energy Savings

6/1/2009

6/1/2011

$

25,750

Marcellus

Marcellus Community School - VS

VS roof repair/resurface

4/4/2009

7/3/2010

$

8,500

Marcellus Community School - MS

MS Parking lot repair/resurface

7/1/2009

8/30/2010

$

25,000

Marcellus Community School

Mantenance building repairs

6/1/2009

7/1/2011

$

28,500

Marcellus Community School

Computer -120 Lab Desktops

7/1/2009

6/30/2011

$

30,000

Marcellus Community School - ES

ES Parking lot repair/resurface

7/1/2009

8/30/2010

$

40,000

Marcellus

Marcellus Community School - HS

HS Parking lot repair/resurface

7/1/2009

8/30/2010

$

45,000

Marcellus

Marcellus Community School

Computer - 60 Classroom Desktops

7/1/2009

6/30/2011

$

127,250

Marcellus

Marcellus Community School - HS

HS roof repair/resurface

4/2/2009

6/30/2010

$

145,500

tt i m

ub

Marcellus Marcellus Marcellus Marcellus

02262009

d e t

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

651 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Marcellus Community Schools Marcellus

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

St. Clair County Resa Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools Memphis Community Schools

Marysville

Marcellus Community School - ES St. Clair County RESA - Admin, Woodland Center & TEC

Memphis

Memphis JH/SH

New Doors to Outside & Hardware (18 Doors)

5/1/2009

Memphis

Memphis Elementary

Construct Picnic Tables (Materials & Wages)

5/1/2009

Memphis

Memphis JH/SH

Electrical System for Emergency Shelter

6/1/2009

Memphis

Memphis Transportation

800 MGHZ Radio

5/1/2009

Memphis

Memphis Transportation

Hand Dryer Garage

5/1/2009

Memphis

Memphis Transportation

Natural Gas/Heated Power Washer

Memphis

Memphis Transportation

Garage Water Softner

Memphis

Memphis Transportation

6 Pro Heaters for Busses

Memphis

Memphis District Wide

Bulk Salt Shed

Memphis

Memphis District Wide

Maintenance Equipment/Tractor/Snow Removal

Memphis

Memphis Transportation

3 New Busses

Morrice Area Schools

Morrice

Morrice digital programming

provide Elmo projectors for each classroom

9/1/2009

1/1/2010

$

50,000

Morrice Area Schools Munising Public Schools Munising Public Schools Oakridge Public Schools Oakridge Public Schools Oakridge Public Schools

Morrice

Morrice smart boards

provide smart-boards for each classroom

9/1/2009

1/1/2010

$

150,000

Munising

Munising Public School District High School

HVAC update at high school.

6/1/2009

9/1/2009

$

156,250

Munising

Munising Public School District High School

6/1/2009

6/1/2010

$

663,282

Muskegon

Oakridge Public Schools, Elem

Electrical efficiency upgrades. School Safety and Security - purchasing a messenger system for the district and 10 security cameras for the three Elementary schools

No

3/6/2009

$

13,500

Muskegon

Oakridge Public Schools, Elem

No

6/30/2009

$

200,000

Muskegon

Oakridge Public Schools, middle

Repair roof on the Middle and Elementary Schools which are 18 years old Build Seven additional Classrooms to replace the seven portables still at Lower Elementary

No

9/30/2010

$

875,000

New Haven

New Haven Schools-Wiring for Internet and computer access at the New Haven Middle School on Clark Street

We are currently involved in renovations at this building. We would like to wire the building for Internet and computer access in the classrooms.

June, 2009

December, 2009

$

300,000

Onaway Area Community

Building Enery Enhancenements. Replacing worn out steam valves to better regulate heat in classrooms. Add insulation to existing steam pipes to prevent heat loss. Asbestos material was previously removed and insulation needs to be replaced. Replacement of some exterior doors where needed for better energy effeciencies. 5/1/2009

6/1/2010

$

310,000

Onaway Area Community

Academic Building Enhancements. Adding Two additional Elementary Classrooms in order to provide more intervention services to students in academic need. - $ 200,000. Replace worn interior classroom doors that are detoriorating the appearance of the entry to the classrooms - $150,000. Adding classroom computers and upgrading existing computer labs - $55,000. 5/1/2009

6/1/2010

$

405,000

New Haven Community Schools

Onaway Area Community School District

Onaway Area Community School District

Onaway

Onaway

02262009

u S

bm

4/3/2009

6/30/2010

$

187,000

Update occupancy sensors

7/9/2009

12/9/2009

$

11,000

$

54,000

$

5,000

$

150,000

$

2,000

$

2,300

5/1/2009

$

6,000

5/1/2009

$

8,000

5/1/2009

$

18,000

5/1/2009

$

20,000

5/1/2009

$

103,000

5/1/2009

$

234,000

s

st

e u

eq

A T

O N

R d

e t t

it

ES roof repair/resurface

Submitted Requests - Not Approved

O R

D VE

PP

Route (Infrastructure Only)

652 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Parchment School District Parchment School District Parchment School District Parchment School District

Location City or Township Parchment City

Parchment - Middle School

Parchment City

Parchment Central Elementary

Parchment City

Parchment - Middle School

Parchment City

Parchment - Middle School

Project Description Middle School building is in need of total HVAC replacement systems including boilers, air handlers and univent systems Central Elementary is in need of renovation of the main/front entrance for security reasons. Middle School building is in need of partial flooring replacements in cafeteria, band room. Middle School building is in need of partial roof replacement with a modified built up roof.

Pittsford Area

Pittsford Area Schools is a K-12 District which is housed under one roof. Our oldest building was built in 1938. We did pass a sinking fund a year ago to begin to tackle some of our needs but we only generate $95,000 a year and so the monies will not go far. We have already worked with an architectural firm to help us understand our needs. The following projects will be completed throughout the whole District allowing us to conserver and reduce energy. We will replace and reduce all of our windows, build exterior walls for the new windows that will have an R19 rating, spray on insulation onto the ceiling, add a drop ceiling, replace and reduce the amount of lighting fixtures, update all electrical, update all bathrooms and locker rooms to be more energy efficient, tuck point and seal all exterior brick, update exterior doors, replace all existing carpet, add a security system, update our kitchen facilities, all interior doors will be replaced to meet code, update our District PA system, meet all requirements for ADA by adding an elevator, update our science labs, and because we will have now made our building tight and energy efficient we will add a geo therma6/8/2009

Plainwell Community Schools/ District Wide

District Wide Domestic Hot Water Heater replacement: Replace with 95% to 98% efficient hot water heaters. Replace recirulation pumps with energy efficient ones and tie in to District Wide Energy Management System 120 days

Pittsford Area Schools Pittsford Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plainwell Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools

Plainwell

Plainwell

Plainwell Plainwell Plainwell

m b u

Plainwell Plainwell

Plymouth Plymouth

02262009

S

R d

Submitted Requests - Not Approved

Funding Request

6/1/2009

8/1/2009

$

1,000,000

6/1/2009

8/1/2009

$

75,000

3/1/2009

4/9/2009

$

100,000

3/1/2009

4/9/2009

$

200,000

8/20/2010

$

9,000,000

Within 2 years of start date

$

97,000

$

384,000

$

1,500,000

$

2,260,000

$

5,400,000

$

17,500,000

$

250,000

$

450,000

$

594,000

$

1,250,000

-N

e t t

it

Plainwell

Plymouth

s t s

Start Date

O R

D VE

Route (Infrastructure Only)

P P A

District Wide Asbestos Removal: Involves removal of all asbestos containing floor tiles,ceiling tiles, pipe insulation, and replacing old floor tile, ceiling tile and pipe Plainwell Community Schools/ District Wide insulation with new as needed. District Wide Water Conservation Project: Replacement of old inefficient fixtures with Plainwell Community Schools/ District Wide new water saving ones Plainwell Community Shools/ Gilkey Geothermal System: Involve major HVAC renovation of spaces built prior to 2003, Elementary with new Geothermal System Geothermal System : Involves major HVAC renovation of 120,000 s.f. of the Middle Plainwell Community School Middle School School to a new Geothermal System Distict Wide Boiler Replacement: Replace boilers with new 95% and up efficeint Plainwell Community Schools/ District Wide boilers and retro piping to handle lower return temperatures Solar Hot Water Project: To provide hot water for Middle Schools restrooms, kitchen, Plainwell Community Schools/ Middle School gym and pool locker rooms. Solar Hot Water Project: To provide hot water for gym locker rooms, kitchen, Plainwell Community Schools/ High School restrooms,etc. Kindergarten classroom needs as per unfunded state mandates: Add 2 new Plainwell Community Schools/ District Wide kindergarten classrooms district wide for all day Kindergarten Plainwell Community Schools/ Adult Ed New Adult Education Building: School District currently leases a facility, would need Building to purchase land. (Needs to be considered a Leed Project) Remodel and expand Cafeteria, kitchen, classrooms and toilets and construct a six Plymouth Canton - West Middle School classroom addition for growing student population. Remodel and expand Cafeteria, kitchen, classrooms and toilets and construct a six Plymouth Canton - Pioneer Middle School classroom addition for growing student population. Replace existing asphalt paving / improve storm water drainage & management / PCCS - Central Middle School Site remodeling improve student safety Plymouth Canton - Central Middle School Site Replace existing asphalt paving / improve storm water drainage & management / remodeling improve student safety Plymouth Canton - Administration Building Site remodeling Replace existing asphalt paving / improve storm water drainage & management.

eq

Plainwell

Plymouth

T O

e u

Plainwell

Plymouth

Project Name

Expected Completion Date

120 days

Within 2 years of start date Within 2 years of start date Within 2 years of start date Within 2 years of start date Within 2 years of start date Within 2 years of start date Within 2 years of start date Within 2 years of start date Within 2 years of start date

6/1/2009

8/1/2010

$

1,800,000

6/1/2009

8/1/2010

$

3,700,000

4/1/2009

9/1/2009

$

40,000

4/1/2009

9/1/2009

$

40,000

4/1/2009

9/1/2009

$

75,000

120 Days 120 days 120 days 120 Days 120 days 120 days 120 days 120 days

653 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Plymouth-Canton Community Schools Pontiac Academy For Excellence Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District

Location City or Township Plymouth

Project Name PCCS - Transportation Site remodeling Plymouth Canton - Transportation Site remodeling

Project Description Replace existing asphalt paving / improve storm water drainage & management / improve student safety Replace existing asphalt paving / improve storm water drainage & management / improve student safety Replace existing asphalt paving / improve storm water drainage & management / improve student safety Replace existing asphalt paving / improve storm water drainage & management / improve student safety Replace existing asphalt paving / improve storm water drainage & management / improve student safety / Increase parking capacity Replace existing asphalt paving / improve storm water drainage & management / improve student safety / Increase parking capacity

Start Date

Expected Completion Date

Funding Request

4/1/2009

9/1/2009

$

81,000

4/1/2009

9/1/2009

$

81,000

4/1/2009

9/1/2009

$

101,000

4/1/2009

9/1/2009

$

101,000

$

365,000

9/1/2009

$

365,000

9/1/2009

$

800,000

4/1/2009

9/1/2009

$

800,000

9/1/2009

$

1,100,000

9/1/2009

$

1,100,000

9/1/2009

$

1,100,000

8/1/2010

$

1,800,000

8/1/2010

$

3,700,000

August 1st

$

5,200,000

7/9/2009

10/9/2009

$

40,000

7/9/2009

10/9/2009

$

50,000

Replace Exterior Doors

7/9/2009

10/9/2009

$

50,000

Replace Exterior Doors

7/9/2009

10/9/2009

$

60,000

Replace Exterior Doors

7/9/2009

10/9/2009

$

80,000

Replace Windows

7/9/2009

10/9/2009

$

90,000

Replace Exterior Doors

7/9/2009

10/9/2009

$

90,000

Pontiac-KENNEDY

Replace Exterior Windows

7/9/2009

10/9/2009

$

100,000

Pontiac-WHITMAN

Replace Exterior Windows

7/9/2009

10/9/2009

$

280,000

Pontiac-JEFFERSON

Replace Exterior Windows

7/9/2009

10/9/2009

$

322,000

Pontiac-PNHS

Replace Exterior Doors

7/9/2009

10/9/2009

$

400,000

Pontiac

Pontiac-PNHS

Replace Exterior Windows

7/9/2009

10/9/2009

$

1,600,000

Pontiac

Pontiac-MADISON

Repair/Replace bleachers in Auxiliary Gym

7/9/2009

10/9/2009

$

80,000

Plymouth Plymouth

PCCS - Tanger Building Site remodeling Plymouth Canton - Tanger Building Site remodeling

Plymouth Plymouth

PCCS - East Middle School Site remodeling Plymouth Canton - East Middle School Site remodeling PCCS - Curriculum Building Elementary remodeling Plymouth Canton - Curriculum Building Elementary remodeling PCCS - Administration Building Site remodeling

Plymouth Plymouth Plymouth Plymouth

Replace existing windows and partial mechanical system for energy efficiency

4/1/2009

PP

4/1/2009

A T

Replace existing windows and partial mechanical system for energy efficiency

Plymouth

PCCS - Administration Building remodeling Plymouth Canton - Administration Building remodeling

Plymouth, Michigan

PCCS - West Middle School

Plymouth, Michigan

PCCS - Pioneer Middle School

Pontiac

Pontiac Academy for Excellence

Replace existing asphalt paving / improve storm water drainage & management. 4/1/2009 Replace existing exterior wall system and partial mechanical system for energy efficiency. 4/1/2009 Replace existing exterior wall system and partial mechanical system for energy efficiency. 4/1/2009 Remodel and expand Cafeteria, kitchen, classrooms and toilets and construct a six classroom addition for growing student population. 6/1/2009 Remodel and expand Cafeteria, kitchen, classrooms and toilets and construct a six classroom addition for growing student population. 6/1/2009 Property is 4 acre empty lot which has passed Phase 2 environmental. Build 120,000 sq. ft air filled sports dome for gym and neiborhood use. May 1st

Pontiac

Pontiac-FROST

Replace Exterior Doors

Pontiac

Pontiac-HERRINGTON

Replace Exterior Doors

Pontiac

Pontiac-ROGERS

Pontiac

Pontiac-WHITMAN

Pontiac

Pontiac-JEFFERSON

Pontiac

Pontiac-FROST

Plymouth

m b u

Pontiac

Pontiac-MADISON

Pontiac Pontiac Pontiac Pontiac

02262009

S

O N

R d

e t t

it

st

e u

eq

s

Submitted Requests - Not Approved

O R

4/1/2009

9/1/2009

D VE

Route (Infrastructure Only)

654 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District Pontiac City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Pontiac

Pontiac-PNHS

Replace bleachers in main gym.

7/9/2009

10/9/2009

$

100,000

Pontiac

Pontiac-KENNEDY

Repair sidewalks and curbs.

4/9/2009

10/9/2009

$

20,000

Pontiac

Pontiac-ROGERS

Install New Security System

4/9/2009

10/9/2009

$

40,000

Pontiac

Pontiac-ALCOTT

Install New Security System

4/9/2009

10/9/2009

$

50,000

Pontiac

Pontiac-FROST

Resurface parking lot.

4/9/2009

$

50,000

Pontiac

Pontiac-KENNEDY

Resurface parking lot.

4/9/2009

6/9/2009

$

50,000

Pontiac

Pontiac-PNHS

Repair sidewalks and curbs.

4/9/2009

10/9/2009

$

50,000

Pontiac

Pontiac-WHITMAN

Install New Security System

4/9/2009

10/9/2009

$

50,000

Pontiac

Pontiac-HERRINGTON

Install New Security System

4/9/2009

10/9/2009

$

60,000

Pontiac

Pontiac-ROGERS

Resurface driveway and parking lot.

4/9/2009

6/9/2009

$

75,000

Pontiac

Pontiac-KENNEDY

Remodel Restrooms

4/9/2009

10/9/2009

$

80,000

Pontiac

Pontiac-JEFFERSON

Replace fire alarm system

4/9/2009

10/9/2009

$

90,000

Pontiac

Pontiac-JEFFERSON

Install New Security System

4/9/2009

10/9/2009

$

100,000

Pontiac

Pontiac-KENNEDY

Install New Security System

4/9/2009

10/9/2009

$

106,000

Pontiac

Pontiac-HERRINGTON

Boiler Replacement

4/9/2009

10/9/2009

$

110,000

Pontiac

Pontiac-MADISON

Install New Security System

4/9/2009

10/9/2009

$

110,000

Pontiac

Pontiac-JEFFERSON

Remodel Restrooms

4/9/2009

10/9/2009

$

131,000

Pontiac

Pontiac-PNHS

Resurface parking lot and driveways.

4/9/2009

10/9/2009

$

180,000

Pontiac

Pontiac-PNHS

Install New Security System

4/9/2009

10/9/2009

$

250,000

Pontiac

Pontiac-PNHS

Remodel Restrooms

4/9/2009

10/9/2009

$

390,000

ADA Accessibility

4/9/2009

10/9/2009

$

105,000

Pontiac-ALCOTT

Install new Boilers

4/9/2009

10/9/2009

$

110,000

Pontiac-FROST

ADA Accessibility

4/9/2009

10/9/2009

$

162,000

Pontiac-ALCOTT

ADA Accessibility

4/9/2009

10/9/2009

$

180,000

Pontiac-HERRINGTON

ADA Accessibility

4/9/2009

10/9/2009

$

180,000

Pontiac

Pontiac-KENNEDY

ADA Accessibility

4/9/2009

10/9/2009

$

298,000

Pontiac

Pontiac-WHITMAN

ADA Accessibility

4/9/2009

10/9/2009

$

424,000

m b u

Pontiac

Pontiac-ROGERS

Pontiac Pontiac Pontiac Pontiac

02262009

S

O N

R d

e t t

it

s

st

e u

eq

A T

Submitted Requests - Not Approved

PP

O R 6/9/2009

D VE

Route (Infrastructure Only)

655 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Pontiac City School District Pontiac City School District Pontiac City School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Pontiac

Pontiac-JEFFERSON

ADA Accessibility

4/9/2009

10/9/2009

$

439,000

Pontiac

Pontiac-MADISON

ADA Accessibility

4/9/2009

10/9/2009

$

629,000

Pontiac

Pontiac-PNHS

ADA Accessibility

4/9/2009

10/9/2009

$

865,000

Port Huron

PHASD Cleveland

Univents: replace 4 vintage units

6/10/2009

8/15/2009

$

78,000

Port Huron

PHASD Cleveland

$

92,950

Port Huron

PHASD Cleveland

8/31/2009

$

96,200

Port Huron

PHASD Holland Wds

Temperature controls - update as mechanical equipment is replaced 6/10/2009 Windows, entrances: exterior entrances (alum/FRP/HM) 4 sets; replace older, non insulated window systems 6/10/2009 Windows: replace along north side of bldg; entrances: replace ext. w/ alum framing and FRP doors w/ new hardware 6/10/2009

8/31/2009

$

164,320

Port Huron

PHASD Roosevelt

Temperature controls: replace old control system throughout building

6/10/2009

8/31/2009

$

175,247

Port Huron

PHASD Holland Wds

Temperature controls

6/10/2009

8/15/2009

$

260,871

Port Huron

PHASD

W Wilson

8/31/2009

$

321,589

Port Huron

PHASD

Pt Huron High

Electrical service, distribution: update service, MDP and panels 6/10/2009 Electrical service, distribution: replace dist equip w/in building; remove bus work w/in tunnels and replace with conduit and wire 6/10/2009

8/31/2009

$

402,568

Port Huron

PHASD Holland Wds

8/15/2009

$

422,500

Port Huron

PHASD Cleveland

Boilers, piping: replace Bryan boilers - new pumps, piping, flues and gas train 6/10/2009 Boilers, piping: 30 years old - replace boilers, hydronic piping, air compressor, pumps and concrete floor 6/10/2009

8/15/2009

$

438,750

Port Huron

PHASD Holland Wds

6/10/2009

8/15/2009

$

604,500

Port Huron

PHASD

PH Northern

6/10/2009

8/31/2009

$

684,938

Port Huron

PHASD

Pt Huron High

6/10/2009

8/31/2009

$

1,157,728

Port Huron

Port Huron PHASD Garfield

AHU ventilation: replace exhaust fans in toilet rooms

6/10/2009

8/15/2009

$

7,800

Port Huron

Port Huron PHASD

AHU ventilation: update toilet room exhaust

6/10/2009

8/15/2009

$

15,600

Port Huron

Port Huron PHASD Cleveland

Univents: replace 4 vintage units

6/10/2009

8/15/2009

$

78,000

Port Huron

Port Huron PHASD Cleveland

Temperature controls - update as mechanical equipment is replaced

6/10/2009

8/15/2009

$

92,950

Exterior Building: Roofing: replace north wing

6/10/2009

8/15/2009

$

113,126

Port Huron PHASD Holland Wds

AHU ventilation: replace original

6/10/2009

8/15/2009

$

162,500

Port Huron PHASD Cleveland

AHU ventilation: replace gym and cafeteria air handling equip (26 yrs old)

6/10/2009

8/15/2009

$

260,000

Port Huron PHASD

AHU ventilation: replace out-dated gym & cafeteria roof-top units

6/10/2009

8/15/2009

$

260,000

Port Huron PHASD Holland Wds

Temperature controls

6/10/2009

8/15/2009

$

260,871

Port Huron

Port Huron PHASD Central

AHU ventilation: replace café units; update exhaust in locker rooms

6/10/2009

8/15/2009

$

357,500

Port Huron

Port Huron PHASD Garfield

Exterior Building: Roofing: replace shingled and flat roof areas

6/10/2009

8/15/2009

$

365,820

m b u

Port Huron

Port Huron PHASD

Port Huron Port Huron Port Huron Port Huron

02262009

S

st

e u

O N

Univents Windows: replace classroom window systems; entrances: replace ext. w/ alum framing and FRP doors w/ new hardware Windows: replace classroom windo systems; entrances: replace ext. w/ alum framing and FRP doors w/ new hardware

eq

R d

W Wilson

e t t

it

s

A T

PH Northern

H D Crull

PP

Submitted Requests - Not Approved

O R 8/15/2009

D VE

Route (Infrastructure Only)

656 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Port Huron

Port Huron PHASD Holland Wds

Univents

6/10/2009

8/15/2009

$

604,500

Port Huron

Port Huron PHASD

Exterior Building: Roofing: total replacement of 2nd floor roof area

6/10/2009

8/15/2009

$

607,750

Port Huron

Port Huron PHASD Holland Wds

Exterior Building: Roofing: replace 80% of building

6/10/2009

8/15/2009

$

640,900

Port Huron

Port Huron PHASD Central

Exterior Building: Roofing: replace 79000 sf of roof area

6/10/2009

8/15/2009

$

872,950

Port Huron

Port Huron PHASD

AHU ventilation: replace and upgrade @ toilet rooms, locker rooms

6/10/2009

$

884,000

Port Huron

Port Huron PHASD Roosevelt

AHU ventilation: replace bad exhaust fans in toilet areas

6/10/2009

$

11,700

Port Huron

Port Huron PHASD Operations

6/10/2009

8/31/2009

$

65,000

Port Huron

Port Huron PHASD Cleveland

Electrical: replace & upgrade service Windows, entrances: exterior entrances (alum/FRP/HM) 4 sets; replace older, non insulated window systems

PP

8/31/2009

6/10/2009

8/31/2009

$

96,200

Port Huron

Port Huron PHASD Roosevelt

Electrical service, distribution: update existing panels

6/10/2009

8/31/2009

$

127,452

Port Huron

Port Huron PHASD Cleveland

8/31/2009

$

137,566

Port Huron

Port Huron PHASD Holland Wds

Electrical service, distribution: update distribution and branch panels 6/10/2009 Windows: replace along north side of bldg; entrances: replace ext. w/ alum framing and FRP doors w/ new hardware 6/10/2009

8/31/2009

$

164,320

Port Huron

Port Huron PHASD Roosevelt

Temperature controls: replace old control system throughout building

6/10/2009

8/31/2009

$

175,247

Port Huron

Port Huron PHASD Holland Wds

Electrical service, distribution: upgrade existing MDP and panels

6/10/2009

8/31/2009

$

189,725

Port Huron

Port Huron PHASD Michigamme

6/10/2009

8/31/2009

$

217,159

Port Huron

Port Huron PHASD

Electrical service, distribution: new service , MDP and panels Electrical service, distribution: update electrical service, Xformers, distribution and branch panels

6/10/2009

8/31/2009

$

238,271

Port Huron

Port Huron PHASD Central

Electrical service, distribution: replace service and MDP

6/10/2009

8/31/2009

$

241,574

Port Huron

Port Huron PHASD Garfield

Electrical service, distribution: update distribution and branch panels

6/10/2009

8/31/2009

$

313,326

Port Huron

Port Huron PHASD

6/10/2009

8/31/2009

$

314,210

Port Huron

Port Huron PHASD

6/10/2009

8/31/2009

$

684,938

Port Huron

Port Huron PHASD

Electrical service, distribution: UPDATE DISTRIBUTION AND BRANCH PANELS Windows: replace classroom window systems; entrances: replace ext. w/ alum framing and FRP doors w/ new hardware Windows: replace classroom windo systems; entrances: replace ext. w/ alum framing and FRP doors w/ new hardware

6/10/2009

8/31/2009

$

1,157,728

Windows: replace all wood windows; Entrances: replace 4 doors

6/10/2010

8/31/2010

$

53,670

Windows: replace all wood windows; Entrances: replace 4 doors Boilers, piping: heat exchangers and associated piping replace if univents are replaced

6/10/2010

8/31/2010

$

53,670

6/10/2010

8/31/2010

$

97,500

PHASD Michigamme

Temperature controls: upgrade as univents are replaced

6/10/2010

8/15/2010

$

114,400

Port Huron PHASD Michigamme

Temperature controls: upgrade as univents are replaced 6/10/2010 Temperature controls: replace pneumatic controls with DDC as mechanical equipmen is replace 6/10/2010 Temperature controls: replace pneumatic controls with DDC as mechanical equipmen is replace 6/10/2010

8/15/2010

$

114,400

8/31/2010

$

187,212

8/31/2010

$

187,212

m b u

PHASD Operations

Port Huron

Port Huron Port Huron

H D Crull

e t t

S

Port Huron PHASD

PHASD

Port Huron

Port Huron PHASD

e u

st

eq

s

A T

O N

R d

PH Northern PH Northern

Pt Huron High

Port Huron PHASD Operations

Port Huron

02262009

PH Northern

it

Port Huron

Port Huron

W Wilson

W Wilson

H D Crull H D Crull

Submitted Requests - Not Approved

O R 8/15/2009

D VE

Route (Infrastructure Only)

657 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Port Huron

PHASD Garfield

Port Huron

Port Huron PHASD Garfield

Port Huron

PHASD Garfield

Port Huron

Port Huron PHASD Garfield

Project Description Start Date Windows: replace window systems at NW wing; Entrances: replace HM doors with alum framing/FRP 6/10/2010 Windows: replace window systems at NW wing; Entrances: replace HM doors with alum framing/FRP 6/10/2010 Temperature controls: replace pneumatic controls with DDC as mechanical equipmen is replaced 6/10/2010 Temperature controls: replace pneumatic controls with DDC as mechanical equipmen is replaced 6/10/2010

Port Huron

PHASD

Temperature controls - replace as equipment is replaced

6/10/2010

Port Huron

Port Huron PHASD

Temperature controls - replace as equipment is replaced

6/10/2010

Port Huron

PHASD

Port Huron

Port Huron PHASD

Port Huron

Expected Completion Date

Funding Request

8/31/2010

$

190,450

8/31/2010

$

190,450

$

246,149

$

246,149

$

252,677

PP

8/31/2010

$

252,677

8/31/2010

$

297,700

Windows: replace along west and north; Entrances replace rusted HM frames & doors6/10/2010

8/31/2010

$

297,700

PHASD Michigamme

Univents: replace 17 classroom original and louvers

6/10/2010

8/15/2010

$

331,500

Port Huron

Port Huron PHASD Michigamme

Univents: replace 17 classroom original and louvers

6/10/2010

8/15/2010

$

331,500

Port Huron

PHASD Central

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2010

8/31/2010

$

332,163

Port Huron

Port Huron PHASD Central

8/31/2010

$

332,163

Port Huron

PHASD Roosevelt

8/31/2010

$

335,400

Port Huron

Port Huron PHASD Roosevelt

8/31/2010

$

335,400

Port Huron

PHASD Michigamme

Temperature controls: convert to new DDC controls as equipment is replaced 6/10/2010 Windows: replace all windows; entrances: replace 3 HM with alum framing and FRP doors 6/10/2010 Windows: replace all windows; entrances: replace 3 HM with alum framing and FRP doors 6/10/2010 Exterior Building: Roofing: replace roofing over original areas of building; rework/extend downspouts to direct water away from building 6/10/2010

8/15/2010

$

386,100

Port Huron

PHASD

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2010

8/31/2010

$

431,981

Port Huron

Port Huron PHASD

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2010

8/31/2010

$

431,981

Port Huron

Port Huron PHASD Roosevelt

6/10/2010

8/15/2010

$

437,580

Port Huron

PHASD Michigamme

6/10/2010

8/31/2010

$

439,400

Port Huron

Port Huron PHASD Michigamme

Exterior Building: Roofing: replace all roofing except new addition in 2001 Windows: replace window system around perimeter of original building; entrances: replace all exterior HM doors with alum framing/FRP Windows: replace window system around perimeter of original building; entrances: replace all exterior HM doors with alum framing/FRP

6/10/2010

8/31/2010

$

439,400

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2010

8/31/2010

$

468,832

Temperature controls: convert to new DDC controls as equipment is replaced

6/10/2010

8/31/2010

$

468,832

PHASD Central

Windows: total removal of existing window systems, panels & glass block construction, install new full height alum window system; entrances: replace ext entrances with alum framing and FRP doors w/ new hardware

6/10/2010

8/31/2010

$

554,119

Port Huron PHASD Central

Windows: total removal of existing window systems, panels & glass block construction, install new full height alum window system; entrances: replace ext entrances with alum framing and FRP doors w/ new hardware

6/10/2010

8/31/2010

$

554,119

Port Huron

PHASD

Univents: replace current out-dated ones

6/10/2010

8/31/2010

$

585,000

Port Huron

Port Huron PHASD

Univents: replace current out-dated ones

6/10/2010

8/31/2010

$

585,000

PHASD

Port Huron

Port Huron

02262009

W Wilson

H D Crull H D Crull

A T

O N

R d

e t t

it

eq

s

st

e u

Pt Huron High

PH Northern

Port Huron PHASD

S

Windows: replace along west and north; Entrances replace rusted HM frames & doors6/10/2010

Pt Huron High

m b u

Port Huron

Port Huron

W Wilson

PH Northern

H D Crull H D Crull

Submitted Requests - Not Approved

8/31/2010 8/31/2010

O R 8/31/2010

D VE

Route (Infrastructure Only)

658 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Port Huron

PHASD

Port Huron

Port Huron PHASD

Port Huron

PHASD

Port Huron

Port Huron PHASD

Port Huron

Project Description

Funding Request

Windows: replace panels above windows entrances: partial replacement throughout 6/10/2010

8/31/2010

$

604,500

Windows: replace panels above windows entrances: partial replacement throughout 6/10/2010

8/31/2010

$

604,500

Univents: replace orginals in 34 classrooms

6/10/2010

8/31/2010

$

663,000

Univents: replace orginals in 34 classrooms

6/10/2010

8/31/2010

$

663,000

PHASD Garfield

Univents: install unit vetillators to replace radiators

6/10/2010

$

682,500

Port Huron

Port Huron PHASD Garfield

Univents: install unit vetillators to replace radiators

6/10/2010

8/31/2010

$

682,500

Port Huron

PHASD Central

Univents: replace old univents and louvers

6/10/2010

8/31/2010

$

702,000

Port Huron

Port Huron PHASD Central

Univents: replace old univents and louvers

6/10/2010

8/31/2010

$

702,000

Port Huron

PHASD

AHU ventilation: replace and upgrade @ toilet rooms, locker rooms and tunnels

6/10/2010

8/31/2010

$

754,000

Port Huron

PHASD Garfield

Boilers: replace steam boilers with hot water and re-pipe building for hot water

6/10/2010

8/31/2010

$

951,561

Port Huron

PHASD

Univents: replace as part of piping replacement

6/10/2010

8/31/2010

$

1,306,500

Port Huron

Port Huron PHASD

6/10/2010

8/31/2010

$

1,306,500

Port Huron

PHASD

6/10/2010

8/31/2010

$

1,345,500

Port Huron

Port Huron PHASD

Univents: replace as part of hydronic piping replacement

6/10/2010

8/31/2010

$

1,345,500

Port Huron

PHASD

Pt Huron High

Boilers, piping: install steam converters and re-pipe existing building

6/10/2010

8/31/2010

$

2,405,000

Port Huron

PHASD

PH Northern

Boilers, piping: replace boiler and components and new hydronic piping

6/10/2010

8/31/2010

$

3,250,000

Port Huron

PHASD Operations

Roofing: roof drainage at front entrance

6/10/2009

8/31/2009

$

2,600

Port Huron

PHASD

Parking lot: patch NE driveway, sidewalks

5/1/2009

11/1/2009

$

5,460

Port Huron

PHASD Michigamme

Parking lot, sidewalks: misc minor replacement of concrete sidewalks

5/1/2009

11/1/2009

$

9,750

Port Huron

PHASD

Parking lot, sidewalks: remove existing stone planters Parking lot: asphalt mill & overlay S & N parking areas; sidewalks: replace 2800 sf concrete sidewalk and receiving area stoops

5/1/2009

11/1/2009

$

19,500

5/1/2009

11/1/2009

$

71,159

Parking lot: mill and resurface west drive and north lot Parking lot: expand east parking lot by 24000 sf; Sidewalks: replace exterior stairs and refurbish existing ramp Parking lot: surface mill and asphalt overlay; sidewalks: remove and replace 1800 sqft at loading dock area

5/1/2009

11/1/2009

$

88,694

5/1/2009

11/1/2009

$

116,740

5/1/2009

11/1/2009

$

238,259

11/1/2009

$

620,754

11/1/2009

$

722,987

11/1/2009

$

771,995

Port Huron

PH Northern PH Northern

Pt Huron High

it

PHASD Holland Wds

S

PHASD Garfield PHASD

H D Crull

PHASD Central

Port Huron

PHASD Operations

Port Huron

PHASD

PH Northern

st

O N

e u

eq

R d

e t t

W Wilson

s

Univents: replace as part of piping replacement

A T

Univents: replace as part of hydronic piping replacement

Pt Huron High

Pt Huron High

Port Huron

02262009

W Wilson

Pt Huron High

PHASD Roosevelt

Port Huron

W Wilson

W Wilson

m b u

Port Huron

Port Huron

W Wilson

Start Date

Expected Completion Date

PP

Parking lot: mill & remove 13-15 islands and repave sidewalks: 24200 sf R&R all around building & 1-HC ramp; rebuild 4 storm structuers in main parking lot; replace current poles and bases 5/1/2009 Parking lot and sidewalks: rework sidewalk @ N. entrance; mill & overlay lot; replace culvert @ West approach; Erect canopy over fuel station 5/1/2009 Parking lot: mill & re-surface all asphalt except west drive; sidewalks: replace at receiving area 5/1/2009

Submitted Requests - Not Approved

O R 8/31/2010

D VE

Route (Infrastructure Only)

659 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Port Huron

Port Huron PHASD Operations

Roofing: roof drainage at front entrance

6/10/2009

8/31/2009

$

2,600

Port Huron

Port Huron PHASD

Parking lot: patch NE driveway, sidewalks

5/1/2009

11/1/2009

$

5,460

Port Huron

Port Huron PHASD Michigamme

Parking lot, sidewalks: misc minor replacement of concrete sidewalks

5/1/2009

11/1/2009

$

9,750

Port Huron

Port Huron PHASD

5/1/2009

11/1/2009

$

19,500

Port Huron

Port Huron PHASD Roosevelt

Parking lot, sidewalks: remove existing stone planters Parking lot: asphalt mill & overlay S & N parking areas; sidewalks: replace 2800 sf concrete sidewalk and receiving area stoops

$

71,159

Port Huron

Port Huron PHASD Holland Wds

11/1/2009

$

88,694

Port Huron

Port Huron PHASD Garfield

11/1/2009

$

116,740

Port Huron

Port Huron PHASD

11/1/2009

$

238,259

11/1/2009

$

620,754

11/1/2009

$

722,987

11/1/2009

$

771,995

4/1/2009

4/1/2010

$

39,000

4/1/2009

4/1/2010

$

39,000

4/1/2009

4/1/2010

$

39,000

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Keyless entry, cameras, security,

4/1/2009

4/1/2010

$

39,000

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

65,000

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

65,000

PH Northern

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

195,000

Pt Huron High

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

195,000

PHASD 21 schools

Technology: Wireless LCD projectors for 700 classrooms

3/31/2009

12/31/2009

$

840,000

PHASD 14 schools

3/31/2009

12/31/2009

$

980,000

PHASD 21 schools

Technology: 28 wireless mobile lags of 32 laptops each (2 per elementary building) Technology: tablet PC computers and docking stations for 745 teachers. These tablets would connect to the wireless projectors in each classroom

3/31/2009

12/31/2009

$

1,862,500

Port Huron

PHASD 21 schools

Technology: network up grade, VoIP, wireless. Installation of POE switches, wireless access points, IP cameras, voice & email servers, video server and storage 3/31/2009

12/31/2009

$

3,400,000

Port Huron

PHASD 7 schools

Technology: one-to-one program for 6-12 grades (5950 students/computers)

12/31/2009

$

5,950,000

Pt Huron High

W Wilson

H D Crull

Parking lot: mill and resurface west drive and north lot Parking lot: expand east parking lot by 24000 sf; Sidewalks: replace exterior stairs and refurbish existing ramp Parking lot: surface mill and asphalt overlay; sidewalks: remove and replace 1800 sqft at loading dock area

Port Huron

Port Huron PHASD Operations

Port Huron

Port Huron PHASD

Port Huron

PHASD

H D Crull

Keyless entry, cameras, security

Port Huron

PHASD

W Wilson

Keyless entry, cameras, security

Port Huron

PHASD Garfield

Port Huron

PHASD Michigamme

Port Huron

PHASD Roosevelt

Port Huron

PHASD Cleveland

Port Huron

PHASD Holland Wds

Port Huron

PHASD Central

Port Huron

PHASD

tt i m

ub

Port Huron

PHASD

Port Huron Port Huron Port Huron

02262009

S

st

s

e u

O N

Keyless entry, cameras, security

d e t

PP

5/1/2009

A T

Port Huron PHASD Central

PH Northern

5/1/2009

5/1/2009

Parking lot: mill & remove 13-15 islands and repave sidewalks: 24200 sf R&R all around building & 1-HC ramp; rebuild 4 storm structuers in main parking lot; replace current poles and bases 5/1/2009 Parking lot and sidewalks: rework sidewalk @ N. entrance; mill & overlay lot; replace culvert @ West approach; Erect canopy over fuel station 5/1/2009 Parking lot: mill & re-surface all asphalt except west drive; sidewalks: replace at receiving area 5/1/2009

Port Huron

q e R

Submitted Requests - Not Approved

O R

5/1/2009

3/31/2009

11/1/2009

D VE

Route (Infrastructure Only)

660 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District Port Huron Area School District

Location City or Township

Project Name

Port Huron

Port Huron PHASD Cleveland

Port Huron

Project Description

Start Date

Expected Completion Date

Funding Request

6/1/2009

$

9,750

Port Huron PHASD Roosevelt

Exterior Building: Brick Repairs / Tuckpointing / Caulk Joints (wall cracks at stage) 4/1/2009 Exterior Building: Foundations, wall repair: minor restoration of existing joints around perimeter 4/1/2009

6/1/2009

$

13,000

Port Huron

Port Huron PHASD Garfield

Exterior Building: Foundations, wall repair: misc repair and tuckpointing

4/1/2009

6/1/2009

$

19,500

Port Huron

Port Huron PHASD Holland Wds

6/1/2009

$

19,500

Port Huron

Port Huron PHASD

Exterior Building: Foundations, wall repair: misc repairs and tuckpointing 4/1/2009 Exterior Building: Foundations, wall repair: tuck pointing and investigate settlement by aux gym 4/1/2009

$

19,500

Port Huron

Port Huron PHASD Michigamme

Exterior Building: Foundations, wall repair: misc repair and tuckpointing

4/1/2009

6/1/2009

$

26,000

Port Huron

Port Huron PHASD

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Port Huron

Port Huron PHASD Garfield

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Port Huron

Port Huron PHASD Michigamme

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Port Huron

Port Huron PHASD Roosevelt

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Port Huron

Port Huron PHASD

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

39,000

Port Huron

Port Huron PHASD Cleveland

4/1/2010

$

39,000

Port Huron

Port Huron PHASD

Keyless entry, cameras, security, 4/1/2009 Exterior Building: Foundations, wall repair: replace cracked brick and tuck pointing of mortar joints and stone copings; install sump pumps in tunnels 4/1/2009

6/1/2009

$

45,500

Port Huron

Port Huron PHASD Central

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

65,000

Port Huron

Port Huron PHASD Holland Wds

4/1/2009

4/1/2010

$

65,000

Port Huron

Port Huron PHASD

W Wilson

Keyless entry, cameras, security Exterior Building: Foundations, wall repair: repair wall cracks, caulk at copings; address canopy & soffit painting/rust

4/1/2009

6/1/2009

$

78,000

Port Huron

Port Huron PHASD

Pt Huron High

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

195,000

Port Huron

Port Huron PHASD

PH Northern

Keyless entry, cameras, security

4/1/2009

4/1/2010

$

195,000

Port Huron

Port Huron PHASD 21 schools

Technology: Wireless LCD projectors for 700 classrooms

3/31/2009

12/31/2009

$

840,000

Port Huron

Port Huron PHASD 14 schools

3/31/2009

12/31/2009

$

980,000

Port Huron PHASD 21 schools

Technology: 28 wireless mobile lags of 32 laptops each (2 per elementary building) Technology: tablet PC computers and docking stations for 745 teachers. These tablets would connect to the wireless projectors in each classroom

3/31/2009

12/31/2009

$

1,862,500

Port Huron PHASD 21 schools

Technology: network up grade, VoIP, wireless. Installation of POE switches, wireless access points, IP cameras, voice & email servers, video server and storage 3/31/2009

12/31/2009

$

3,400,000

Technology: one-to-one program for 6-12 grades (5950 students/computers)

3/31/2009

12/31/2009

$

5,950,000

Replace unit ventilators and air handlers in office and gym areas

6/15/2009

8/15/2009

$

120,000

Portage Public Schools - Angling Elementary Remove and replace courtyard window walls 6/15/2009 Replace windows and screens throughout building. Current windows are single pane Portage Public Schools - Haverhill Elementary original equipment 6/15/2009 Replace windows and screens throughout building. Current windows are single pane Portage Public Schools - Central Elementary original equipment 6/15/2009

8/15/2009

$

125,000

8/15/2009

$

245,000

8/15/2009

$

330,000

m b u

Port Huron

Portage Public Schools Portage Portage Public Schools Portage Portage Public Schools Portage Portage Public Schools Portage

02262009

H D Crull

W Wilson

Pt Huron High

S

s

st

e u

eq

A T

O N

R d

e t t

it

Port Huron

Port Huron

PH Northern

Port Huron PHASD 7 schools Portage Public Schools - Woodland Elementary

Submitted Requests - Not Approved

PP

O R 6/1/2009

D VE

Route (Infrastructure Only)

661 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Portage Public Schools Portage

Project Name

Project Description

Start Date

Portage Public Schools Portage

Portage Public Schools - West Middle School Replace original boiler equipment Replace classroom unit ventilators, controls and casework including media center, Portage Public Schools - Amberly Elementary gym, and cafeteria

Portage Public Schools Portage

2007 Bond Issue provides for funding of 6 conventional fueled school buses for $500,000. Requesting additional funding for 6 hybrid buses for green initiative pilot program at premium of $77,600 each.

Portage Public Schools

Expected Completion Date

Funding Request

6/15/2009

8/15/2009

$

345,000

6/15/2009

8/15/2009

$

417,000

6/15/2009

8/15/2009

$

465,600

7/1/2010

$

25,514,851

8/15/2009

$

200,000

8/15/2009

$

200,000

8/15/2009

$

200,000

8/15/2009

$

976,262

7/1/2010

$

25,514,851

O R

D VE

Portage Public Schools Portage

New 111,442 sq. ft. Special Education Facility on Milham Avenue in Portage Michigan to serve students with severe disabilities and students with autism spectrum disorder. Kalamazoo Regional Educational Service (Request for funding is to assist with shortfall due to economic indicators that have Agency greatly reduced our ability to earn projected interest required for the project) 4/1/2009 Traffic separation project for buses, parents, and pedestrians that will dramatically Porage Public Schools - Angling Elementary improve safety. 6/15/2009 Traffic separation project for buses, parents, and pedestrians that will dramatically Portage Public Schools - Haverhill Elementary improve safety. 6/15/2009 Portage Public Schools - Woodland Traffic separation project for buses, parents, and pedestrians that will dramatically Elementary improve safety. 6/15/2009

Portage Public Schools Portage

Portage Public Schools - Northern High School, North Middle, Community Education Center

Please see attached PDF since this caused significant formatting issues

Kalamazoo Regional Educational Service Agency

New 111,442 sq. ft. Special Education Facility on Milham Avenue in Portage Michigan to serve students with severe disabilities and students with autism spectrum disorder. (Request for funding is to assist with shortfall due to economic indicators that have greatly reduced our ability to earn projected interest required for the project) 4/1/2009

Portland Public Schools-All Buildings

Replace obsolete business computers. Current technology is over 8 years old. Not compatible with newer operating systems and software applications. This would allow the business end of the District to operate more efficiently and effectively. 7/1/2009

9/1/2009

$

22,000

Replace obsolete printers and copiers. Current technology is over 8 years old. Not dependable. Needs replacement. Newer technology is more efficient and thereby saves the District in energy costs

7/1/2009

9/1/2009

$

100,000

Kalamazoo R.E.S.A.

Portage

Portage Public Schools Portage Portage Public Schools Portage

Kalamazoo R.E.S.A.

Portage, MI

Portland Public School District Portland

A T

e u

st

q e R

s

O N

PP

6/15/2009

Portland Public School District Portland

Portland Public Schools-All Buildings

Portland Public School District Portland

Portland Public Schools-Westwood Elementary

Roof scheduled for replacement. It has lasted longer than expected. Time to replace aging roof with more energy efficient design in order to protect the learning environment for the students while reducing the energy cost to the school district. 7/1/2009

9/1/2009

$

550,000

Portland Public School District Portland

Roof scheduled for replacement. It has lasted longer than expected. Time to replace aging roof with more energy efficient design in order to protect the learning Portland Public Schools-oakwood Elementary environment for the students while reducing the energy cost to the school district. 7/1/2009

9/1/2009

$

650,000

tt i m

Portland Public School District Portland

Portland Public School District Portland

02262009

Portland Public Schools

Provide lighting for tennis courts. This would allow the community to use the tennis courts after hours. This would be a joint effort between the schools and the City Recreation program

7/1/2009

9/1/2010

$

90,000

Portland Public Schools-High School

Provide lighting for the soccer field. This would allow the community to use the socce field after hours. This would be a joint effort between the schools and the City Recreation program 7/1/2009

9/1/2010

$

100,000

Portland Public Schools

Install a fiber optic connection between the High School and Bus Garage and on to the Ionia County Intermediate School District. This would thwart identity theft and provide a dependable, secure link for business, accounting, student scheduling, student records and communication throughout the county. 7/1/2009

9/1/2010

$

800,000

ub

Portland Public School District Portland

S

d e t

Submitted Requests - Not Approved

Route (Infrastructure Only)

662 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Portland Public School District Portland

Portland Public Schools-Middle School

Provide a Handicap Accessible elevator from one level of the school building to the other. The Middle School was built in the 1960's and has multiple levels that require student access. The elevator would allow handicapped students independent movement throughout the building. 7/1/2009

Portland Public School District Portland

Portland Public Schools

Replace obsolete instructional computers for student use. Current technology is over 8 years old. Not compatible with newer operating systems and software applications. 7/1/2009

Portland Public Schools

Instructional technology equipment including scanners, cameras, microscopes cameras, etc. This would enhance the learning experience of all students through the use of technology while helping the District move towards completing its Technology Plan 7/1/2009

Portland Public Schools

Special Departmental Technology for Band, a radio station, TV broadcasting, etc. This would allow us to complete our Technology Plan while enhancing the educational experiences for all kids. 7/1/2009

Portland Public School District Portland Portland Public School District Portland

Portland Public School District Portland Portland Public School District Portland

Portland Public School District Portland

Portland Public School District Portland Public School District Portland Public School District Pinckney Community Schools

New Haven Community Schools

s

Portland Township

Portland Public Schools-All Buidlings

Portland Township

Portland Public Schools Pinckney Community Schools - Pinckney Elementary

b u S

Ray Twp., Michigan

02262009

$

30,000

9/1/2010

$

50,000

9/1/2010

$

100,000

9/1/2009

$

150,000

9/1/2010

$

200,000

d e t

Data Electronics. Replacement of antiquated data network hardware, switches, software etc. This would shore up our network and provide a more secure environment for our learning, instructional and business networks including securing student identification information Provide security cameras with G.P.S. systems on all busses to protect the security of all student passengers and the bus driver. Construct a concrete pad to park the busses on. This would help to eliminate a slipand-fall hazard for our bus drivers Additional cost to replace existing building. New building would be equipped with energy efficient heating, cooling and lighting systems.

qu

e R

New Haven Schools-Construction of a wastewater treatment plant at the site of the new middle school

t s e

7/1/2009

9/1/2010

$

500,000

7/1/2009

9/1/2009

$

32,000

7/1/2009

9/1/2009

$

30,000

6/1/2009

9/1/2010

$

5,289,894

June, 2010

$

3,776,972

November, 2009

$

100,000

O N

We have recently broken ground on the construction of a new middle school, pursuant to a bond issue passed in 2005. It has taken more time than we expected to start this project due to our inability to secure water and sewer service to this site. We found that water would not be available in sufficient volume through a well system on the site to meet requirements. We had to negotiate an Intergovernmental agreement between neighboring townships to acquire water and sewer services --- and ultimately we have to install the off-site water and sewer lines (to bring the service from their current location to the site) at district expense that was not planned in the original bond. The agreement specifies that the township will provide water and sewer service. While we have successfully acquired an agreement to supply water (after we pay for the outside water line); we have found that even at our expense, the terms of the agreement between the involved townships to provide sewer service could not be finalized. This has necessitated our construction of our own wastewater treatment plant on the site, solely to service the school district site. Once again, both of these coJune, 2009

Currently, we are storing materials in an open classroom of the building. This is a New Haven Schools-Construction of a storage waste of educational space. We would like to construct a small storage building for building on the site of the Siefert Elementary supplies and equipment that are taking up space in the building in an outstanding building. School

Submitted Requests - Not Approved

June, 2009

7/1/2010

O R

PP

Portland Public Schools

Portland Public Schools

Ray Twp

748,000

Provide Wireless/Mobile Computer Labs for all buildings for student use. This was a part of our Technology Plan for the District that we have never been able to fund. It would provide wonderful learning opportunities for all of our students. 7/1/2009

tt i m

New Haven Community Schools

$

Portland Public Schools

Portland

Putnam Twp

100,000

A T

9/1/2010

Funding Request

$

Video network including Distance Learning would allow a small rural school district to expand the educational opportunities of its students. This would enhance the learning experience of all students through the use of technology while helping the District move towards completing its Technology Plan 7/1/2009 Purchase TV's and Projectors. Replace obsolete technology that has fulfilled its usefu life expectation. 7/1/2009

Portland Public Schools

Expected Completion Date

9/1/2010

D VE

Route (Infrastructure Only)

663 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Memorial

Domestic Water Piping

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Forest

Domestic Water Piping

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview High School

ADA Compliance

6/15/2010

8/31/2010

Riverview Community School District Riverview

Riverview Seitz MS

Domestic Water Piping

6/15/2010

Riverview Community School District Riverview

Riverview High School

Science Wing Renovation

Rockwood

Riverview High School Gibraltar School District Early Childhood Center

Domestic Water Piping Replace current water tank continuous fed urinals to Green waterless urinals in all bathrooms

Rogers City

RCHS

Replace exterior windows w/ thermopane units

Rogers City

RCHS

Royal Oak Saugatuck

Royal Oak Admin Bldg Saugatuck Public Schools, Saugatuck High /Middle School

Scotts Southfield

Climax-Scotts Bradford Academy

St Clair Shores

Lakeview Public Schools

St Clair Shores

Lakeview Public Schools

St Clair Shores

Lakeview Public Schools

Riverview Community School District Gibraltar School District Rogers City Area Schools Rogers City Area Schools School District Of The City Of Royal Oak Saugatuck Public Schools Climax-Scotts Community Schools Bradford Academy Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb) Lakeview Public Schools (Macomb) Utica Community Schools

Riverview

St Clair Shores

d e tt

S

St Clair Shores

Sterling Heights

02262009

290,000

D VE

450,000

$

580,000

8/31/2010

$

920,000

8/31/2010

$

1,200,000

$

1,800,000

Dec, 2009

Dec, 2009

$

8,000

6/1/2010

8/30/2010

$

150,000

Replace room heating units with Runtel radiators

6/10/2010

8/30/2011

$

150,000

Demolish exsisting Administration Building, will result in asbestos being abated and inefficient HVAC being taken out of service

8/1/2010

12/1/2010

$

350,000

New Roof on Saugatuck High School/Middle School

6/1/2009

9/1/2009

$

1,350,000

Portable Classrooms (Possible Closure of One Building) 5 Units Acquisition of new school facility

7/1/2010 4/1/2009

5/1/2009

$ $

120,000 13,000,000

Flooring and renovations to distance learning lab at Lakeview High School

6/15/2010

9/1/2010

$

35,000

Installation of an electrical gear screen wall at Greenwood Elementary School

6/15/2010

9/1/2010

$

40,000

Purchase of new Recording equipment for Lakeview Public School Auditorium

6/15/2010

9/1/2010

$

60,000

Installation of a Dimming system for auditorium house lighting, which will allow for lowering of house lights to different levels. The current system only allows for on or off in a 1500 seat auditorium

s t s

-N

e u

q e R

6/15/2010

9/1/2010

$

150,000

9/1/2010

$

175,000

Lakeview Public Schools

Storage building on east side of HS to replace the current storage facility that the district has outgrown based on the increased volume of usage at the outdoor athletic facility 6/15/2010 Remodel of front entrance at Jefferson Middle School to include a secure entrance port 6/15/2010

9/1/2010

$

200,000

Lakeview Public Schools

Building of New Athletic Bleachers at Jefferson Middle School outdoor athletic events 6/15/2010

9/1/2010

$

250,000

Utica Community Schools

Replace the existing boilers

August '10

$

500,000

ub

St Clair Shores St Clair Shores

t i m

Lakeview Public Schools

T O

$

$

O R

P P A 6/15/2010

Funding Request

Lakeview Public Schools

Submitted Requests - Not Approved

June '10

Route (Infrastructure Only)

664 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

River Valley School District

River Valley School District

Wayne Resa

Wayne Resa

Project Name

Project Description

Start Date

River Valley School District - Three Oaks Elementary

Demolish two 50+ year old elementary buildings that house one section each of preschool to 5th grade, which have no air circulation, poor heating systems and lack the electricity needed to power today's technologies needed in the classroom. Our classroom square footage is too small as well. Replace these two buildings with one new energy efficient, technology smart, 2/3 section new elementary building to house the elementary preschool to 5th grade students that choose the River Valley School District. 4 to 6 months

Three Oaks

River Valley School District - Middle School/High School

Our Middle/High School campus is housed in one 44 year old building. We need to replace our original electric heating system, new energy efficient windows, our septic system needs to be replaced with city sewer. Incorporate security to the public entry way and secure all doors with electronic entry and security cameras. Renovate our Media/Library center, add new library books and new technology to our media centers and throughout the Middle/High School campus. Upgrade and renovate our 44 year old kitchen, which needs new equipment and a larger space to provide hot meals to students. 4 to 6 months

Wayne

Wayne Co RESA-Education Center Re-surfacing of the roadway, service drives and parking areas. Project would include Roadway, service drive and parking lot rebuild the construction of curbs and rebuild of catch basins to mitigate the erosion of soil and and upgrade protect adjacent wetland areas. 6/1/2009

Wayne

Three Oaks

Wayne Resa

Wayne

Wayne Resa

Wayne

Wayne Co RESA Annex - Heritage Farm Property Upgrades

Expected Completion Date

D VE $

14,000,000

6 months

$

3,500,000

9/1/2009

$

525,000

Repairs to current barn, bridge and maintenance structures to accommodate special needs populations. Rebuild of pond seawalls to prevent erosion and pollution to ponds used for science students water studies. Property is for the use of county students to study rural farming and wildlife. 6/1/2009

9/1/2009

$

175,000

Re-surfacing of the roadway, service drives and parking areas. Project would include the construction of curbs and rebuild of catch basins to mitigate the erosion of soil and protect adjacent wetland areas. 6/1/2009

10/1/2009

$

500,000

T O

14 months

Funding Request

P P A

O R

N s

t s e

Wayne Co RESA Annex - Roadway, service drive and parking lot rebuild and upgrade Wayne Co RESA Annex - Reglazing of exterior windows

Replace, reglazed and/or caulk exterior windows for energy effieiency.

5/1/2009

8/1/2009

$

100,000

Project to waterproof, tuck-point and seal exterior concrete shell of building to prolong the life of the building envelope against weather hazards. All windows to be adjusted, and seal caulked to provide a closed environment to provide further energy savings. 5/1/2009 Renovate the lobby, vestibule entries and restrooms to accommodate ADA mandates for all Annex Administration bldg. facilities. 6/1/2009

9/1/2009

$

300,000

11/1/2009

$

300,000

u q e

Wayne Resa

Wayne

Wayne Resa

Wayne

Wayne Co RESA-Education Center - Exterior Waterproofing, tuck pointing and caulking. Wayne Co RESA Annex - Lobby, Entries and Restroom Renovations

Wayne

Interior Renovations to the Instructional Media and Technology Services floor to Wayne Co. RESA-Education Center provide updated and enhanced technological , reference, research and production Instructional Technology and Media Services services for teachers, students staff and other educators. Area to use eco-friendly Renovations materials for greening and updated lighting package for energy efficiency.

4/1/2009

9/1/2009

$

1,000,000

Wayne

Wayne County Regional Education Service Agency-Education Center - Uninterrupted Power Source

Purchase and installation of UPS unit and associated batteries for continuous uninterrupted power and electrical services to protect pupil accounting records, transportation routes, student schedules, payroll, financial and all other educational services, reports and data.

5/1/2009

8/1/2009

$

120,000

Multiple School Building Projects

New Instructional Areas, Energy Conservation, Remodeling and Renovations to Existing Buildings, Site Improvements, Student Safety/Security, HVAC Improvements, Technology and Technology Infrastructure, Transportation, ADA Compliance and Code Compliance Spring 2009

Multiple Projects (over next two years)

$

66,833,763

Wayne Resa

Wayne Resa

West Bloomfield School District

R d

i m

ub

S

West Bloomfield Township

02262009

e t tt

Submitted Requests - Not Approved

Route (Infrastructure Only)

665 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wolverine Community Schools Wolverine

Project Name

Project Description

Wolverine Community Schools

Start Date

Expected Completion Date

Our district is in need of a new bus garage as we have 5 buses and our current bus garage only houses one. Our estimated cost for this will be $125,000.00. Our elementary building is 25 years old and is in dire need of new windows being replaced The estimated cost for this is $150,000.00. Our high school building is 49 years old and is in need of a new entry door to that building. 5/1/2009

9/1/2009 8/10/2009

Funding Request

D VE $

277,500

$

50,000

$

50,000

8/1/2009

$

2,500

8/1/2009

$

20,000

6/1/2009

8/1/2009

$

25,000

3/9/2009

9/9/2009

$

30,000

6/1/2009

8/1/2009

$

35,000

6/1/2009

8/4/2010

$

37,200

6/1/2009

8/1/2009

$

40,000

6/1/2009

8/1/2009

$

50,000

6/1/2009

8/1/2009

$

53,400

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Exterior Solar lighting

4/9/2009

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Exterior Solar lighting

4/9/2009

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New ADA door access at main door

6/1/2009

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New doors and hardware - exterior

6/1/2009

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New carpeting in office and media center

Yale Public Schools

Yale/ Brockway Township Yale Public Schools

Corn burner to heat 2 buildings

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Partial replacement of carpeting, VCT, doors in classrooms

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Upgrade power to existing computer labs

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New stormwater system for site/building improvements

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New playground space, equipment, fencing

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Temperature controls upgrade

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Temperature controls upgrade

6/1/2009

8/1/2009

$

185,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Temperature controls upgrade

6/1/2009

8/1/2009

$

224,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools

District wide broadband internet access

4/9/2009

8/22/2009

$

120,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Uninterrupted Power Supply system

6/1/2009

8/1/2009

$

4,500

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Add fire protection in janitor's closets

6/1/2009

8/1/2009

$

5,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Uninterrupted Power Supply system

6/1/2009

8/1/2009

$

8,500

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Emergency lighting upgrades

6/1/2009

8/1/2009

$

9,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

Surge supression system for technology equipment

6/1/2009

8/1/2009

$

15,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Junior High

Surge suppression system for technology equipment

6/1/2009

8/6/2010

$

25,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale High School

Surge supression system for technology equipment

6/1/2009

8/1/2009

$

25,000

Yale Public Schools

Yale/ Brockway Township Yale Public Schools/Yale Elementary

New computers, server, mobile lab, video projectors

6/1/2009

8/1/2009

$

319,220

Yale Public Schools Adrian City School District

Yale/ Brockway Township Yale Public Schools/Yale Elementary School Exterior Solar lighting Replace exterior windows/ curtain wall system with energy efficient, tempered Adrian Adrian Public Schools - Michener Elementary windows with thermal, EE glass

4/9/2009

8/7/2009

$

50,000

5/1/2009

4/1/2010

$

225,000

m b u

S

02262009

O N

R d

e t t

it

st

e u

eq

s

A T

Submitted Requests - Not Approved

PP

O R 8/11/2009

Route (Infrastructure Only)

666 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Adrian City School District Adrian

Project Description

Start Date

Adrian Public Schools - Michener Elementary Kiln for Art Room

2/1/2009

Benzie County Central Schools

12/31/2009

Benzonia, MI

Benzie County Central Schools

Replace Unit ventilators in old wing, add fin tube raditation along north and east walls, upgrade gym heating and ventilation, abandon under floor heating piping and install new distribution piping above ceiling. 7/1/2009

12/31/2009

Berrien Springs

Berrien Springs

Berrien Springs Public Schools/Middle School Berrien Springs Public Schools/Sylvester Elementary Berrien Springs Public Schools/Mars Elementary

Berrien Springs

Berrien Springs Public Schools/High School

Berrien Springs

Berrien Springs Public Schools/Middle School Mechanical; Replace boilers with smaller high efficiency boilers

Berrien Springs

Berrien Springs Public Schools/Middle School Mechanical; Replace cooling with high efficiency chillers Berrien Springs Public Schools/Sylvester Windows: Replace all windows with energy efficient windows. Old windows are Elementary deteriorating and damaged and cannot be repaired.

Berrien Springs

Berrien Springs

D VE

360,000

$

42,000

PP

8.15.2010

$

42,000

10.4.2009

$

50,000

6.15.2009

9.1.2009

$

100,000

6.15.2009

9.1.2009

$

150,000

6.15.2009

9.1.2009

$

160,000

6.15.2009

10.4.2009

$

220,000

1.4.2010

$

250,000

6.15.2009

9.1.2009

$

972,000

4.15.2009

9.1.2009

$

32,400

4.15.2009

9.1.2009

$

40,000

Mechanical: unit ventilator replacement in all classrooms; air handler replacement at Art Room; variable frequency drive replacement at the Cafeteria air handling unit 4.15.2009

9.1.2009

$

60,000

Mechanical: upgrade facility mechanical control system

4.15.2009

9.1.2009

$

165,000

Media Center / Gymnasium Roof Replacement: remove existing ballasted EPDM roof finish system down to the roof deck; replace with Polyisobutylene membrane roof over 4.15.2009 Berrien Springs Public Schools/Middle School tapered polisocyanurate insulation [5,643 SF]

9.1.2009

$

212,400

Mechanical: unit ventilator replacement in all classrooms; air handler replacement at Art Room; variable frequency drive replacement at the Cafeteria air handling unit 4.15.2009

9.1.2009

$

300,000

Lighting: Upgrade lighting in gymnasium and light switch height.

6.15.2009

Lighting: Upgrade lighting in gymnasium and light switch height. Windows: Replace all windows with energy efficient windows. Old windows are deteriorating and damaged and cannot be repaired. Windows: Replace all windows with energy efficient windows. Old windows are deteriorating and damaged and cannot be repaired.

6.15.2009

s

6.15.2009

A T

O N

e u

st

Main Entrance Vestibule Addition: provide air lock efficiency with an exterior set of vestibule doors; improve facility safety by introducing door access technology and security cameras

Berrien Springs Public Schools Berrien Springs Berrien Springs Public Schools Berrien Springs

Gymnasium Roof Replacement: remove existing buit-up roof finish system down to Berrien Springs Public Schools/Sylvester the roof deck; replace with Polyisobutylene membrane roof over tapered Elementary polisocyanurate insulation [5,643 SF] Windows: Replace all windows with energy efficient windows. Old windows are Berrien Springs Public Schools/Middle School deteriorating and damaged and cannot be repaired.

Berrien Springs Public Schools Berrien Springs Berrien Springs Public Schools Berrien Springs

Berrien Springs Public Schools/High School Berrien Springs Public Schools/Sylvester Elementary

itt

d e t

q e R

m b u

O R 8.15.2010

Berrien Springs

Berrien Springs Public Schools/Sylvester Elementary Berrien Springs Public Schools/Sylvester Elementary

Paved Parking Lots & Walks Repair/replace parking lots and Walkways

6.15.2009

8.15.2010

$

140,000

Berrien Springs

Berrien Springs Public School/Middle School Paved Parking Lots & Walks Repair/replace parking lots and Walkways

6.15.2009

10.4.2009

$

325,000

Berrien Springs

Berrien Springs Public Schools/High School

6.15.2009

10.4.2009

$

350,000

Berrien Springs

02262009

Paved Parking Lots & Walks Repair/replace parking lots and Walkways

Submitted Requests - Not Approved

Route (Infrastructure Only)

11,000

$

Berrien Springs Public Schools/High School

S

$

640,000

Berrien Springs Public Schools Berrien Springs

Berrien Springs Public Schools Berrien Springs

Funding Request

$

Masonry Remediation: replace and or repair all masonry, steel lintels and material transition sealant at exterior perimeter of the facility; add masonry weeps and flashing to enable trapped moisture within the masonry cavity to escape;improve efficiency by eliminating moisture infiltration into the building and minimizing heat loss; improve Berrien Springs Public Schools/Middle School structural soundness 6.15.2009

Berrien Springs Public Schools Berrien Springs

Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools

5/1/2009

Replace classroom ventilators, rebuild large air handlers, rebuild steam traps,add pipe insulation, convert steam heat to hot water heat, upgrade controls system to DDC, add district wide mgt system, a/c main office. 7/1/2009

Benzie County Central Schools Benzonia, MI Benzie County Central Schools Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools Berrien Springs Public Schools

Project Name

Expected Completion Date

667 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarenceville School District Clarenceville School District Clarenceville School District Clarenceville School District Clarenceville School District

Clarenceville School District Romeo Community Schools

Lenawee ISD Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District

Project Description

Livonia

Livonia

Livonia

Livonia Livonia

1,038,063

$

400,000

60 days after start

$

160,000

60-90 days after start

$

357,500

Clarenceville School District - Botsford Elementary

New controls and unit ventilators are needed in many areas to maximize energy efficiency and more importantly to provide an improved educational atmosphere for the students in buildings that are more than 50 years old.

6/15/2009

Clarenceville School District - Grandview Elementary

New controls and unit ventilators are needed in many areas to maximize energy efficiency and more importantly to provide an improved educational atmosphere for the students in buildings that are more than 50 years old.

6/15/2009

60-90 days after start

$

375,100

Clarenceville School District - Middle School

New controls and unit ventilators are needed in many areas to maximize energy efficiency and more importantly to provide an improved educational atmosphere for the students in buildings that are more than 50 years old.

6/15/2009

60-90 days after start

$

438,810

New controls and unit ventilators are needed in many areas to maximize energy efficiency and more importantly to provide an improved educational atmosphere for the students in buildings that are more than 50 years old.

6/15/2009

$

645,000

Upgrade outdated media center

6/15/2009

$

300,000

$

325,000

varies

$

8,000,000

9/1/2009

$

700,000

9/1/2009

$

369,000

3/1/2010

$

211,000

T O

s t s

-N

Addison Township

Adrian

Lenawee ISD

Adrian

Adrian Public School - Alexander Elementary HVAC Upgrades inclusive if unit ventilator replacement, DDC controls and Ventilation 5/1/2009

itt

d e t

m b u

O R

P P A

Improve security at building entrances by opening up "blind entrances" into buildings. 6/15/2009

q e R

11/30/2009

5/1/2009

e u

Adrian

D VE $

Replace last 3 boilers in district with high efficiency boilers

The district's facilites are are all more than 50 years old and are need of many repairs and upgrades. Over the last 2 years, the district hired a firm to perform a complete facilities analysis. The projects identified above total approximately $7,000,000. In addition to the above projects, many additional projects were identified. These additional projects are projected to cost an additional $8,000,000 in today's dollars. Some Clarenceville School District - District Wide Many of these are smaller projects that could begin immediately.. Immediately Romeo Community School / Hamilton Parsons Upgrade / Replace HVAC systems and associated controls to achieve greater energy Elementary efficiency 6/1/2009

Livonia

TBD

Funding Request

Dryden Community Schools -High School Clarenceville School District - Clarenceville High School

Clarenceville School District - Clarenceville High School Clarenceville School District - Clarenceville Middle School Clarenceville School District - Botsford and Grandview elementaries

Livonia

Start Date

Roof replacement, exterior door replacement, finish and casework replacement, boiler replacement, upgrade energy management controls, replace plumbing fixtures, electrical upgrades, replace kitchen equipment, replace furniture. On site, replace parking lots, retaining wall replacement, extend storm sewer system, replace playground surfacing and equipment, landscaping. TBD Remodel old industrial arts area into an arts wing for music, art, drama, and large group instruction and testing. 6/1/2009

Chelsea School district-North Creek Elementary School Renovation

Chelsea School District Chelsea Dryden Community Schools Dryden Township Clarenceville School District Livonia Clarenceville School District

Project Name

Expected Completion Date

District-wide: Standardize all energy management systems to increase energy efficiency, decrease manpower and provide timely diagnosis of system issues

60-90 days after start 60-75 days after start 60-75 days after start

Adrian Public Schools-7/8 Middles School

Exterior site signage

5/1/2009

11/9/2009

$

4,700

Adrian Public Schools-7/8 Middles School

Installation of lighted flag poles

5/1/2009

11/9/2009

$

5,000

Adrian Public Schools - Prairie Elementary

Baseball Diamond/Soccer field

5/1/2009

11/9/2009

$

23,000

Adrian Public Schools-7/8 Middles School

Building security upgrades inclusive of cameras and card access

5/1/2009

11/9/2009

$

27,000

Adrian Public Schools - Prairie Elementary

Storage Building

5/1/2009

4/1/2009

$

30,000

Adrian

Adrian Public Schools - Prairie Elementary

Installation of emergency generators to enhance emergency preparedness

5/1/2009

5/1/2009

$

34,000

Adrian

Adrian Public Schools - Michener Elementary Installation of emergency generators to enhance emergency preparedness

5/1/2009

8/1/2010

$

47,000

Adrian Adrian Adrian Adrian

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

668 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Adrian

Adrian Public Schools - 5/6 Middle School

5/1/2009

11/9/2009

$

71,000

Adrian

Adrian Public Schools - Michener Elementary Plaground upgrades inclusive of play structures, walking paths and soccer goals

5/1/2009

9/1/2010

$

73,000

Adrian

Adrian Public Schools-Highschool

4/1/2010

$

87,000

$

134,000

Adrian

Building security upgrades inclusive of cameras and card access 5/1/2009 Miscellaneous mechanical upgrades inclusive of asbestos removal, insulation, Adrian Public Schools-7/8 Middles School exhaust fans, VAV controls 5/1/2009 Remove and replace existing unit ventilators with new energy efficient units inclusive Adrian Public Schools - Michener Elementary of DDC controls 5/1/2009

$

171,000

Adrian

Adrian Public Schools - 5/6 Middle School

12/1/2010

$

178,000

3/1/2010

$

212,000

9/1/2009

$

217,000

11/9/2009

$

225,000

Adrian

Installation of emergency generators to enhance emergency preparedness

Funding Request

Science Classroom Upgrades

5/1/2009

12/1/2010

P P A

O R 11/1/2010

D VE

Adrian

Restroom upgrades inclusive of asbestos abatement, low flow fixutres, improved ventilation, ceramic veneered walls, toilet partitions and handicap accessibility. 5/1/2009 East Parking lot bus loop/ parking lot inclusive of 16" base, asphalt, stormwater Adrian Public Schools - Michener Elementary drainage, security lighting, curb & gutter 5/1/2009 Remodel courtyard into hancicap accessible student activity center with brick pavers, Adrian Public Schools-Highschool raised beds and outdoor activities. 5/1/2009

Adrian

Adrian Public Schools - Michener Elementary HVAC Upgrades inclusive if unit ventilator replacement, DDC controls and Ventilation 5/1/2009

11/1/2010

$

237,000

Adrian

Adrian Public Schools-Highschool

5/1/2009

5/1/2010

$

317,000

5/1/2009

12/1/2010

$

800,000

5/1/2009

12/1/2010

$

897,000

5/1/2009

8/1/2009

$

225,000

5/1/2009

11/1/2010

$

613,000

Install lighted flagpole

5/1/2009

11/9/2009

$

5,000

Lighted Flagpole

5/1/2009

3/1/2009

$

5,000

Remove and install lighted flagpole

5/1/2009

11/9/2009

$

5,000

Adrian

Adrian Public Schools-Highschool

Adrian

T O

-N

Adrian

Installation of emergency generators to enhance emergency preparedness Remove and replace existing unit ventilators with new energy efficient units inclusive Adrian Public Schools-Highschool of DDC controls Replace exterior windows/ curtain wall system with energy efficient, tempered Adrian Public Schools - 5/6 Middle School windows with thermal, EE glass Replace exterior windows/ curtain wall system with energy efficient, tempered Adrian Public School - Alexander Elementary windows with thermal, EE glass

Adrian

Adrian Public Schools-Highschool

Adrian

Adrian Public School - Lincoln Elementary

Adrian

Adrian Public Schools - Prairie Elementary

Adrian

Adrian Public Schools - 5/6 Middle School

Adrian

Adrian Public School - Lincoln Elementary

Walk off mats at entrances

5/1/2009

11/9/2009

$

7,000

Adrian

Adrian Public Schools - Prairie Elementary

Install tree line wind break on south side of property

5/1/2009

3/1/2009

$

11,000

Adrian Public School - Alexander Elementary Kiln for Art Room

2/1/2009

4/1/2009

$

11,000

Adrian Public Schools-7/8 Middles School

Window treatments

5/1/2009

11/9/2009

$

11,000

Adrian Public School - Lincoln Elementary

Barrier lansdcaping to reduce vandalism and increase carbond dioxide production

5/1/2009

11/9/2009

$

12,000

Adrian Public Schools - Prairie Elementary

Gymnasium wall padding

5/1/2009

4/1/2009

$

12,000

Adrian

Adrian Public Schools - Race Street Facility

Installation of emergency generators to enhance emergency preparedness

5/1/2009

11/9/2009

$

12,000

Adrian

Adrian Public Schools-Highschool

Interior Signage

5/1/2009

11/9/2009

$

12,000

Adrian

Adrian Public Schools-7/8 Middles School

Exhaust Fans

5/1/2009

11/9/2009

$

13,000

Adrian Adrian

tt i m

ub

Adrian Adrian Adrian Adrian

02262009

d e t

S

e u

q e R Tuckpointing

s t s

Submitted Requests - Not Approved

Route (Infrastructure Only)

669 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Adrian

Adrian Public Schools - 5/6 Middle School

Install walk off mats at entrances to reduce floor cleaning costs

5/1/2009

11/9/2009

$

13,000

Adrian

Adrian Public Schools - 5/6 Middle School

Replace damaged ceiling in Frank Street Lobby

5/1/2009

11/9/2009

$

14,000

Adrian

Adrian Public Schools-7/8 Middles School

Barrier lansdcaping to reduce vandalism and increase carbond dioxide production

5/1/2009

11/9/2009

$

15,000

Adrian

Adrian Public Schools-Highschool

Exterior site signage

5/1/2009

11/9/2009

$

15,000

Adrian

Adrian Public Schools - 5/6 Middle School

$

15,000

6/1/2009

$

15,000

5/9/2009

$

17,000

5/1/2009

2/1/2010

$

17,000

5/1/2009

11/9/2009

$

17,000

2/1/2009

4/1/2009

$

17,000

5/1/2009

11/9/2009

$

17,000

5/1/2009

11/9/2009

$

17,000

5/1/2009

11/9/2009

$

18,000

5/1/2009

11/9/2009

$

19,000

5/1/2009

Adrian

New kiln for Art Room Replace exterior doors with energy efficient FRP doors, thermal, broken, aluminum Adrian Public School - Alexander Elementary frames and access controls with a barrier free door access

Adrian

Adrian Public Schools-Highschool

5/1/2009

3/1/2009

PP

O R 4/1/2009

D VE

Adrian

Installation of lighted flag poles Replace exterior doors with energy efficient FRP doors, thermal, broken, aluminum Adrian Public Schools - 5/6 Middle School frames and access controls with a barrier free door access Replace exterior doors with energy efficient FRP doors, thermal, broken, aluminum Adrian Public Schools - Michener Elementary frames and access controls with a barrier free door access

Adrian

Adrian Public Schools - Race Street Facility

Replace overhead doors

Adrian

Adrian Public Schools - Prairie Elementary

Walking paths to promote healthy walking habits

Adrian

Adrian Public School - Alexander Elementary Window treatments

Adrian

Adrian Public School - Lincoln Elementary

Soccer field / goals

Adrian

Adrian Public School - Lincoln Elementary

Paint and caulk exisiting EFIS system to improve energy efficency

Adrian

Adrian Public Schools - 5/6 Middle School

Replace Entrance Canopy inclusive of heavy guage metal framing insulation, lighting, dense glass, roofing, lighting and extruded aluminum panels 5/1/2009

3/1/2010

$

20,000

Adrian

Adrian Public School - Lincoln Elementary

Install recessed lunchroom tables, existing tables are 20+ years old

2/1/2009

6/1/2009

$

22,000

Adrian

2/1/2009

06/20009

$

24,000

Adrian

Adrian Public Schools - Michener Elementary Install recessed lunchroom tables, existing tables are 20+ years old Install compressors in unit ventilators to support air conditioning in Kindergarten Adrian Public Schools - Prairie Elementary classrooms

5/1/2009

3/1/2009

$

27,000

Adrian

Adrian Public Schools - Race Street Facility

Install extruded aluminum panels on exterior of building + insulation

5/1/2009

11/9/2009

$

27,000

Adrian

Adrian Public Schools - 5/6 Middle School

Music Room Casework

5/1/2009

6/1/2009

$

27,000

Adrian Public Schools - Michener Elementary Paint and caulk exisiting EFIS system to improve energy efficency

5/1/2009

11/9/2009

$

27,000

Adrian Public Schools-7/8 Middles School

5/1/2009

11/9/2009

$

30,000

Adrian Public School - Alexander Elementary Paint and caulk exisiting EFIS system to improve energy efficency

5/1/2009

11/9/2009

$

30,000

Adrian Public Schools - Race Street Facility

5/1/2009

11/9/2009

$

34,000

Adrian

tt i m

Adrian

Adrian

S

s

st

e u

q e R

ub

Adrian

Adrian

d e t

A T

O N

PA/ Clocks

Security Fencing + Cameras

Adrian

Adrian Public School - Alexander Elementary Gymnasium Floor

5/1/2009

6/1/2009

$

38,000

Adrian

Adrian Public Schools-Highschool

Replace existing chalkboards with new markerboards/tackboards

5/1/2009

11/9/2009

$

40,000

Adrian

Adrian Public Schools - 5/6 Middle School

Replace existing chalkboards with new markerboards/tackboards

5/1/2009

6/1/2009

$

40,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

670 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Adrian

Adrian Public School - Alexander Elementary Miscellaneous tuckpointing

5/1/2009

11/9/2009

$

41,000

Adrian

Adrian Public School - Alexander Elementary Hard surface play areas

5/1/2009

11/9/2009

$

42,000

Adrian

Adrian Public School - Alexander Elementary South Parking Lot

3/1/2009

5/1/2009

$

42,000

Adrian

Adrian Public School - Lincoln Elementary

Tuckpointing and Brick Cleaning

5/1/2009

11/9/2009

$

43,000

Adrian

Adrian Public Schools - Race Street Facility

Durolast Roof + Insulation

3/1/2009

$

47,000

Adrian

Adrian Public Schools - 5/6 Middle School

Paint and caulk exisiting EFIS system to improve energy efficency

5/1/2009

11/9/2009

$

47,000

Adrian

11/9/2009

$

50,000

Adrian

Adrian Public School - Alexander Elementary Interior painting 5/1/2009 Classroom Casework that was not purchased as part of the bond project due to cost Adrian Public Schools - Prairie Elementary overruns 5/1/2009

11/9/2009

$

51,000

Adrian

Adrian Public Schools-Highschool

5/1/2009

2/1/2010

$

51,000

Adrian

Adrian Public Schools - Michener Elementary Gymnasium Floor

5/1/2009

7/1/2009

$

57,000

Adrian

Adrian Public Schools - 5/6 Middle School

5/1/2009

11/9/2009

$

67,000

Adrian

Adrian Public Schools - 5/6 Middle School

5/1/2009

6/1/2009

$

72,000

5/1/2009

11/9/2009

$

77,000

5/1/2009

11/9/2009

$

78,000

A T

Replace classroom doors with fire rated units

Concrete sidewalks

s

O N

PP

O R 5/1/2009

D VE

Adrian

Install Handicap accesible elevator from first floor to third floor Playground Upgrades inclusive of asphalt walkways, play structure, dugouts and Adrian Public School - Alexander Elementary security fencing

Adrian

Adrian Public School - Lincoln Elementary

Plaster repairs / painting

Adrian

Adrian Public Schools-Highschool

Barrier lansdcaping to reduce vandalism and increase carbond dioxide production

5/1/2009

11/9/2009

$

81,000

Adrian

Adrian Public Schools-7/8 Middles School

Installation of emergency generators to enhance emergency preparedness

5/1/2009

11/9/2009

$

87,000

Adrian

Adrian Public Schools-Highschool

Paint and caulk exisiting EFIS system to improve energy efficency

5/1/2009

11/9/2009

$

92,000

Adrian

Adrian Public Schools-Highschool

Remove and replace existing asbestos containing floor material with sheet linoleum

5/1/2009

11/9/2009

$

100,000

Adrian

Adrian Public Schools-7/8 Middles School

5/1/2009

12/1/2010

$

110,000

Adrian

Adrian Public Schools - 5/6 Middle School

HVAC and filtration equipment replacement for swimming pool Playground Upgrades inclusive of asphalt walkways, play structure, dugouts and security fencing

5/1/2009

11/9/2009

$

111,000

Adrian Public School - Lincoln Elementary

Security Fencing

5/1/2009

11/9/2009

$

117,000

Adrian Public Schools-7/8 Middles School

Replace existing corridor wall with Gypsum resistant drywall

5/1/2009

9/1/2009

$

125,000

Adrian Public School - Lincoln Elementary

5/1/2009

11/9/2009

$

150,000

Adrian Public Schools-Highschool

Parking Lot inclusive of base, asphalt and stormwater removal Replace exterior doors with energy efficient FRP doors, thermal, broken, aluminum frames and access controls with a barrier free door access

5/1/2009

11/9/2009

$

178,000

Adrian Public Schools - 5/6 Middle School

Replace gymnasium floor

5/1/2009

6/1/2009

$

190,000

Adrian

Adrian Public Schools-Highschool

Concrete sidewalks

5/1/2009

11/9/2009

$

203,000

Adrian

Adrian Public Schools - Race Street Facility

Parking Lot inclusive of base, asphalt and stormwater removal

5/1/2009

7/1/2009

$

212,000

m b u

Adrian Adrian Adrian Adrian Adrian

02262009

S

eq

R d

e t t

it

e u

st

Submitted Requests - Not Approved

Route (Infrastructure Only)

671 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Adrian City School District Adrian Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District Adrian City School District

Project Name Adrian Public Schools - 5/6 Middle School

Project Description

Start Date

Tuckpointing

5/1/2009

Adrian

Adrian Public Schools-Highschool

Adrian

Adrian Public Schools-Highschool

Replace existing (uninsulated) porcelain façade system with new insulated curtain wal consisting of metal studs, insualtion, denseglass and extruded aluminum panels 5/1/2009 Replace exterior windows/ curtain wall system with energy efficient, tempered windows with thermal, EE glass 5/1/2009

Adrian

Adrian Public Schools-7/8 Middles School

Concrete sidewalks

5/1/2009

Adrian

Adrian Public Schools _ Comstock

Renovations

5/1/2009

Adrian

Adrian Public Schools - Maple Stadium

Renovations

Adrian

Adrian Public School - Garfield Elementary

Renovations

Lenawee ISD

Adrian

Lenawee ISD

Lenawee ISD

Adrian

Lenawee ISD

11/1/2010

4/1/2010

5/1/2009

$

931,000

$

983,000

$

47,000

$

1,450,000

10/1/2010

$

2,000,000

11/1/2011

$

3,500,000

$

61,500

$

119,925

11/9/2009

O R 11/1/2010

-N

Albion Public Schools

Albion Public Schools Albion

Albion Public Schools

Convert all of the HVAC systems to DDC controls. This is a process to make all of our buildings energy effiecent and to meet the Green Building standards. Replace all exterior windows. This is a process to make all of the buildings energy effiecent and to meet the Green Building standards.

Albion Public Schools Albion

Albion Public Schools

Albion Public Schools Albion Allegan Public Schools Allegan

Albion Public Schools Allegan - High School & North Ward Elementary

Allegan Public Schools Allegan

Allegan - All Buildings

Allegan Public Schools Allegan

Allegan - All Buildings

Allegan Public Schools Allegan

Allegan - 4 Elementary Buildings

Allegan Public Schools Allegan

Allegan - All Buildings

Allegan Public Schools Allegan

Allegan

6/8/2009

9/1/2009

$

1,300,000

6/9/2009

9/2/2009

$

1,300,000

Replace the roofs on all buildings that are leaking and have wet insulation in the roofs.6/11/2009

9/4/2009

$

1,600,000

Alternative energy (wind power) to supply electricity for all school building locations.

6/10/2009

9/3/2009

$

1,800,000

Replace Roof Membrane & Insulate

6/1/2009

8/1/2009

$

1,000,000

WAN Fiber Installation - Allegan Public Schools Component

12/1/2008

6/1/2009

$

75,000

Digital Telephone System

3/1/2009

6/1/2009

$

250,000

Digital HVAC Control Systems Energy Conservation Bond - Started November 2008 - replacement of lighting, replacement of HVAC control systems and mechanical equipment.

5/1/2009

7/1/2009

$

500,000

11/1/2008

7/1/2009

$

800,000

Repair and and resurface Parking lots and driveways

6/1/2009

9/1/2009

$

250,000

Allegan - All Buildings

Identification Signage at all facilities

4/1/2009

7/1/2009

$

100,000

Allegan - All Buildings

Wireless Campus - All Buildings

4/1/2009

9/1/2009

$

400,000

Allegan

Replacement of 5 maintenence vehicles with energy efficient vehicles (battery technology)

ASAP

3/1/2009

$

150,000

Antwerp Twp

Mattawan

Replace condensate tanks

4/1/2009

4/30/2009

$

10,000

Antwerp Twp

Mattawan

Replace and refurbish water heaters

3/1/2009

3/30/2009

$

15,000

Antwerp Twp

Mattawan

Redo heating and a/c vents in various locations

4/1/2009

6/30/2009

$

50,000

Antwerp Twp

Mattawan

Replace Roof on Early Elementary School

3/15/2009

4/30/2009

$

80,000

tt i m

ub

Allegan Public Schools Allegan Allegan Public Schools Allegan Allegan

02262009

S

d e t

s t s

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

413,000

D VE

LISD TECH Center West Wing Sub Corridor: Upgrade ceiling tile, lighting and HVAC When/if funds are Within six months duct work available of start date LISD TECH Center Marketing Classroom: Remove wall and renovate HVAC duct work, ceiling tile and lighting 6/1/2009 9/1/2009

T O

Funding Request

$

11/1/2010

P P A 5/1/2009

Albion Public Schools Albion

Allegan Public Schools Mattawan Consolidated School Mattawan Consolidated School Mattawan Consolidated School Mattawan Consolidated School

Expected Completion Date

672 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Mattawan Consolidated School Mattawan Consolidated School Mattawan Consolidated School Mattawan Consolidated School Mattawan Consolidated School

Athens Area Schools

Athens Area Schools

Athens Area Schools Au Gres-Sims School District Au Gres-Sims School District

Au Gres-Sims School District

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Antwerp Twp

Mattawan

Replace and repair doors to buildings throughout the District

6/15/2009

8/15/2009

$

100,000

Antwerp Twp

Mattawan

Replace lighting fixtures through out District

3/1/2009

10/1/2009

$

200,000

Antwerp Twp

Mattawan

Replace boilers through out the District

3/15/2009

5/15/2009

$

500,000

Antwerp Twp

Mattawan

Various technology infrastructure items

3/1/2009

10/1/2009

$

1,200,000

Antwerp Twp

Mattawan

Replace flooring in Later Elementary Building

6/15/2009

$

125,000

Athens Bus Barn

The fiber shall be terminated at both ends with ST type connectors and terminated in a fiber tray. Adequate precaution must be taken to insure proper bend radius's are adhered to so that the integrity of the cable is not compromised. March, 2009

June, 2009

$

60,000

Athens Parking Lot

The Fiber shall be marked with buried caution tape and locating wire for purposes of future locating for preventive measures. Caution signs at given footage intervals to insure that all personnel may know of the existence of fiber optic cabling is buried in the immediate area. April, 2009

April, 2009

$

200,000

Athens

Athens Fiber Optics

Provide and install approximately 40,000 feet of buried single mode Fiber. Fiber shall be buried from the Athens High School Data Center to the East Leroy Elementary School which is approximately 6.5 miles. Said Fiber Optic Cable shall be fusion spliced and sleeved with heat shrink sleeves to protect the splice from all exterior influences such as weather, and rodents, etc. March, 2009

May, 2009

$

483,000

AuGres City

AuGres-Sims motion sensors

9/1/2009

$

3,965

9/1/2009

$

14,685

Plumbing fixtures in the high school are old and 3.5 gallons per flush. Change out 29 faucets to timed low-flow type to conserve water. Remove and replace 28 toilets to 1 gallon per flush style and install 14 low-flow valves into the urinals to conserve water. 7/1/2009

9/1/2009

$

15,000

Our high school lighting fixtures are 4-bulb (installed during a 1999 remodel) which exceeds the amount of lighting needed in hallways and classrooms. Convert the 4bulb fixtures to 2-bulb fixtures to conserve energy.

7/1/2009

9/1/2009

$

20,000

Athens

Athens

A T

st

s

PP

O N

Current lights are controlled with single pole/single throw switches. Remove existing switches and add motion sensor type to reduce energy consumption. 7/1/2009 Current lights are metal halide and very inefficient. Remove old lights and replace AuGres-Sims gym/multi-purpose room lighting with energy efficient fluorescent-bay type. 7/1/2009

AuGres City

AuGres City

AuGres-Sims plumbing conversions

e u

q e R

O R 7/15/2009

D VE

Au Gres-Sims School District

AuGres City

AuGres-Sims ballast conversions

Au Gres-Sims School District

AuGres City

AuGres-Sims elementary windows

Current windows in upper elementary wing are original single pane windows. Remove existing single pane windows and replace w/energy efficient thermal pane windows. 7/1/2009

9/1/2009

$

28,000

AuGres-Sims pipe insulation

Heating pipes under existing high school were removed and replaced during last bond issue but never insulated. The project would entail insulating the supply and return lines in the crawl space. 7/1/2009

9/1/2009

$

35,000

Several entryways are original to building, over 50 years old. Remove old entryways and replace with energy efficient fiberglass doors and insulated windows. 7/1/2009

9/1/2009

$

35,000

7/1/2009

9/1/2009

$

70,000

7/1/2009

9/1/2009

$

72,850

$

197,100

$

700,000

Au Gres-Sims School District Au Gres-Sims School District Au Gres-Sims School District Au Gres-Sims School District Galesburg-Augusta Community Schools Baldwin Community Schools

AuGres City

ub

AuGres City

S

AuGres City

tt i m

d e t

AuGres-Sims door replacement AuGres-Sims parking lot

AuGres City

AuGres-Sims roof replacements

Augusta Baldwin Community Schools

Augusta

02262009

Baldwin Facility Upgrades

Parking lot is 25 years old and in need of resurfacing. Resurface the parking lot. Re-roof the gymnasium and elem library; add 2" insulation w/new EPDM over insulation. To replace exterior windows of our Intermediate School Building, grades 4-5. Install energy efficient windows ($400,00), expand EMS controls ($100,000) and replace gymnasium floor ($200,000)

Submitted Requests - Not Approved

5/1/2009

9/1/2009

Route (Infrastructure Only)

673 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Durand Area Schools

Bancroft

Complete building entrance and window replacement, HVAC and lighting improvements. Improvements to entrances, windows, HVAC and lighting will create a Durand Area Schools/Wilbur Bills Elementary more productive learning environment as well as improve energy efficiency. School Sustainability/green design will be utilized in the project. 6/9/2009

Baraga Area Schools Bath Community Schools

Baraga

Baraga Area Schools-Energy Efficiency Upgrades

Bath

Bath Middle School

Replace inefficient natural gas boilers ($250,000) and expand energy management control system ($50,000), partial window and door replacement ($200,000) 5/1/2009 Replace 4 outdated uni-vents and incorporate into an updated HVAC system to allow greater control and increased effeciency. 6/9/2009

Bath Middle School

Replace 2 oversized hot water tank/circulating pump systems with 11 smaller, more efficient on-demand units. The current system circulates hot water constantly year round. Expected pay back is one year.

Bath High School

Incorporate direct digital controls (DDC) from an outdated HVAC system to a recently installed system. Would also allow greater control and increased effeciency. Would add the ability of remote operation and scheduling. (newer system had been added with 2005 bond funded addition and renovation) 6/9/2009

Bath Community Schools

Bath Community Schools

Bath

Bath

Expected Completion Date

T O

$

1,068,318

$

500,000

$

45,000

8/9/2009

$

35,000

8/9/2009

$

61,200

8/9/2009

$

100,000

6/9/2009

$

3,000

6/8/2009 - earliest 90 days after work can begin commencement

$

6,200

6/8/2009 - earliest 60 days after work can begin commencement

$

57,000

$

144,000

6/9/2009

12/10/2009

8/1/2009 8/9/2009

P P A

O R

Bath

Bath Elementary School

Bath

Bath Elementary, Middle & High Schools

Extend the existing parking lot near the school entrance to expand the drop off area and widen the entrance from the street to add a turn lane. The current configuration restricts the ability of parents to park and drop off young children near the school entrance creating safety issues. 6/1/2009 Add electric power outlet boxes in the ceiling of math and science classrooms. These outlets will power projectors used for instruction. 3/9/2009

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Territorial School

Remove coal bunker currently located underneath parking lot.

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Lakeview Middle School

Electrical Upgrade of lighting in pool area and re-circuit all classroom lighting to reduce electricity consumption.

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Minges Brook, Prarieview, & Riverside Elementaries

Remove 12 x 12 stick on ceiling tile with PACM glue pods and install acoustical ceiling6/8/2009 - earliest panel systems at each location. work can begin 120 days

Lakeview Sch. District (Calhoun) Battle Creek Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Minges Brook, Riverside, and Westlake Elementaries Lakeview School District - Lakeview High School

Bath Community Schools Bath Community Schools

s t s

-N

e u

eq

R d

e t tt

Replace and/or install damaged or lacking steam and condensate return line pipe insulation in tunnels

Electrical commissioning of facility

i m

b u S

Lakeview Sch. District (Calhoun) Battle Creek

Harper Creek Community Schools

Battle Creek

02262009

Lakeview School District - Minges Brook, Prarieview, Riverside, Westlake Elementaries & Territorial School Upgrade lighting to T-8 at all facilities; increase security lighting at Prarieview

Harper Creek Community Schools

Partially remodeling, refurnishing and re-equipping school district buildings; acquiring and installing educational technology improvements; purchasing school buses; and developing and improving playgrounds, athletic fields and facilities and sites.

Submitted Requests - Not Approved

Funding Request

Could start immediately Could start immediately

D VE

90 days after commencement 180 days after commencement

$

26,000

$

31,000

Work could likely begin at Spring Break (wk of April 6, 2009) and continue on second shift or wait until summer break week of 90 days after June 9th commencement

$

39,000

$

15,000,000

Route (Infrastructure Only)

674 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Lakeview Middle School

Replace broken or non-code compliant floor drain issues

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Prarieview & Minges Brook Elementaries

Replace approximately 12,000 sq ft. section of flat roof at Prarieview and an 8,000 sq. 6/8/2009 - earliest 30 days after ft section of flat roof at Minges Brook with a spray foam sloped roof. work can begin commencement

$

45,000

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Territorial School

Replacement of 24,000 sq ft. EDPM roof at the end of its 20 year life cycle.

6/8/2009 - earliest 45 days after work can begin commencement

$

196,000

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Minges Brook, Prarieview Riverside & Westlake Elementaries, Lakeview Middle School, Territorial School and Bus Garage

Resurface parking lots and drives at each elementary, Territorial School and Bus Garage. Add a second entrance lane to Lakeview Middle School parking lot.

6/8/2009 - earliest 90 days after work can begin commencement

$

280,000

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Minges Brook, Prarieview, Riverside & Westlake Elementaries and Lakeview Middle School

Renovate/replace outdated and/or non-compliant playground equipment and surfaces in an effort to provide appropriate equipment for our children to utilize for physical 6/8/2009 - earliest 90 days after activity and to serve as "neighborhood parks". work can begin commencement

$

448,000

Work could likely begin at Spring Break (wk of April 6, 2009) 5 days

$

3,100

Relocate speakers, renovate spotlights and re-finish wood floor in auditorium

Work could likely begin at Spring Break (wk of April 6, 2009) and continue on second shift or wait until summer break week of June 9th 10 days

$

8,300

Tuck point exterior brick

Immediately weather permitting

$

8,300

$

77,000

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Lakeview Middle School

Lakeview Sch. District (Calhoun) Battle Creek

Lakeview School District - Lakeview Middle School Lakeview School District - Westlake Elementary

itt

S

m b u

Lakeview Sch. District (Calhoun) Battle Creek

02262009

d e t

Lakeview School District - Minges Brook, Prarieview, Riverside & Westlake Elementaries; Territorial School

6/8/2009 - earliest 90 days after work can begin commencement

Funding Request

T O

-N

Install Concrete pads for bicycle racks to accommodate bicycle access at site.

s t s

e u

q e R

O R

D VE

P P A

10 days

Work could likely begin at Spring Break (wk of April 6, 2009) and continue on second shift or wait until summer Cable TV distribution in all elementary buildings and Territorial School which houses break week of 60 days after the administration offices and Battle Creek Area Learning Center. June 9th commencement

Submitted Requests - Not Approved

$

Route (Infrastructure Only)

10,300

675 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lakeview Sch. District (Calhoun) Bear Lake School District Bear Lake School District Beaver Island Community School Beaver Island Community School Beaver Island Community School Beaver Island Community School Beaver Island Community School Beaver Island Community School

Project Name

Project Description

Start Date

Expected Completion Date

Work could likely begin at Spring Break (wk of April 6, 2009) and continue on second shift or wait until summer break week of 60 days after June 9th commencement

Battle Creek

Lakeview School District - All Buildings except Install IP Security Camera System - approximately 135 cameras, 9 DVR's and Territorial School required cabling

Bear Lake

Bear Lake Schools

Waterproof Sealant on Outer Building

Bear Lake

Bear Lake Schools

Smart Boards including wiring

Beaver Island

Beaver Island

Soccer Field

Beaver Island

Beaver Island

Replace Roofing on Existing School Gym

Beaver Island

Beaver Island

Playground

Beaver Island

Beaver Island

Replace Gym Floor

Beaver Island

Beaver Island

Walkway from School to District Library

Beaver Island

Beaver Island

Fitness Room

Bedford Schools, District wide

Install instantaneous water heating equipment at toilet room groupings in the districts buildings. This project will reduce the dependency on stored, heated and re-circulated domestic hot water and provide more energy efficient operation by heating only the required amount of water. 6/2/2009

O R

Funding Request

D VE $

310,000

8/9/2009

$

60,000

7/9/2009

$

30,000

7/1/2009

$

20,000

8/1/2009

$

25,000

6/30/2009

$

40,000

Sept. 2009

$

35,000

8/1/2009

$

15,000

Sept. 2009

$

75,000

9/1/2009

$

84,000

Bedford Public Schools Bedford Township

Bedford Schools, Senior High

Replace the existing 40 year old year old boiler at the Junior High School with a new 97% efficient unit. One unit was replaced in 2003. The older unit is past its useful life. This retrofit has the potential to reduce fuel consumption t by up to 25%. 6/1/2009

10/1/2009

$

96,000

Bedford Public Schools Bedford Township

Replace the existing 45 year old boiler at Jackman Road Elementary with a new 97% efficient unit. One of the units was replaced in 1999. This retrofit has the potential to Bedford Schools, Jackman Road Elementary reduce fuel consumption t by up to 25%. 6/1/2009

Bedford Public Schools Bedford Township

Bedford Public Schools Bedford Township

d e tt

t i m

Bedford Schools, Smith Road Elementary

ub

Bedford Public Schools Bedford Township

Bedford Schools, Senior High

s t s

P P A 6/9/2009 6/9/2009

T O

-N

q e R

e u

10/1/2009

$

96,000

Replace the existing 39 year old boilers at Smith Road Elementary with new 97% efficient units. The units are approaching their useful life. This retrofit has the potential to reduce fuel consumption t by up to 25%. 6/1/2009

10/1/2009

$

192,000

Replace the existing 45 year old boilers at the Senior High School with new 97% efficient units. The boilers are past their useful life. This retrofit has the potential to reduce fuel consumption t by up to 25%.

10/1/2009

$

192,000

6/1/2009

9/1/2009

$

630,000

Bedford Public Schools Bedford Township

Replace existing 50 year old unit ventilators at Jackman Road Elementary School with new units with DDC controls to allow time of day and day of week scheduling. New units will provide more efficient use of the heating water resulting in a savings of Bedford Schools, Jackman Road Elementary 15%. 6/1/2009 Install occupancy controls in district bathrooms, offices, conference rooms and other Bedford Schools, District wide non continuously occupied spaces. 5/1/2009

8/1/2009

$

15,000

Bedford Public Schools Bedford Township

Install a 5KW wind turbine at the Senior High School to utilize in teaching Vocational Educational classes about wind power. Hook a sub meter up to 4 classrooms so that the emery utilized in the classrooms can be compared to the energy generated by the wind turbine. 5/1/2009

8/1/2009

$

25,000

S

Bedford Public Schools Bedford Township

02262009

Bedford Schools, Senior High

Submitted Requests - Not Approved

Route (Infrastructure Only)

676 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Bedford Schools, Douglas Road Elementary

Replace the 51 year old T-12 corridor lighting at Douglas Road Elementary with T-8 dimmable fixtures. The current 8' - T12 fixtures have a combination of PCB and Non PCB ballasts. Replacing the fixtures will remove the remaining PCB containing ballasts from the school. The dimmable system will automatically adjust energy consumption as the sun lights the corridors through the existing skylights. This projec may allow the building to become eligible for the Energy Star designation. This project is estimated to reduce energy consumption by 20%. 5/1/2009

Bedford Schools, District wide

Retrofit existing manual flush vales on water closets and urinals with dual-level flush mechanism. Lifting the handle produces a full flush, pushing the handle downward reduces the water flow by approximately 30%. 5/1/2009

Bedford Schools, Temperance Road Elementary

Replace the 54 year old T-12 lighting at Temperance Road Elementary with T-8 dimmable fixtures. The current 8' - T12 fixtures have a combination of PCB and Non PCB ballasts. Replacing the fixtures will remove the remaining PCB containing ballasts from the school. The dimmable system will automatically reduce energy consumption as the sun lights the rooms through existing windows. This project will bring the building within range of becoming eligible for the Energy Star designation. Energy consumption should be reduced by 20%. 5/1/2009

Bedford Public Schools Bedford Township

Bedford Schools, Junior High

Relamp and rebalast the T-12 lighting at the 40 year old Junior High School with T-8 dimmable ballasts. The current fixtures have a combination of PCB and Non PCB ballasts along with T-12 lamps. Replacing the fixtures will remove PCB containing ballasts from the school. The dimmable system will reduce energy consumption as the sun lights the classroom through the existing windows. Lighting levels would be consistent with industry standards, enhancing learning along with reducing energy costs by 20%. 5/1/2009

Bedford Public Schools Bedford Township

Replace the 50 year old T-12 lighting at Jackman Road Elementary with T-8 dimmable fixtures. The current 8' - T12 fixtures have a combination of PCB and Non PCB ballasts. Replacing the fixtures will remove the remaining PCB containing ballasts from the school. The dimmable system will automatically reduce energy consumption as the sun provides lights through existing windows. This project will bring the building within range of becoming eligible for the Energy Star designation. Bedford Schools, Jackman Road Elementary This project is estimated to reduce energy consumption by 20%. 5/1/2009

Bedford Public Schools Bedford Township

Bedford Public Schools Bedford Township

Bedford Public Schools Bedford Township

T O

Bedford Public Schools Bedford Township

Bedford Public Schools Bedford Township

Bedford Public Schools Bedford Township

02262009

N s

Funding Request

D VE $

25,000

$

25,000

8/1/2009

$

50,000

8/1/2009

$

60,000

O R 8/1/2009

8/1/2009

$

60,000

Replace the vintage 1980's Honeywell energy management system (EMS) at the Junior High School and the Senior High School with a user friendly web based system that is compatible with the current CIQ EMS. Connect existing points and increase classroom control and automate lighting to reduce energy consumption by a minimum of 5%. 5/1/2009

8/1/2009

$

75,000

Bedford Schools, Senior High

Relamp and rebalast the T-12 lighting at the 45 year old Senior High School with T-8 dimmable ballasts. The current fixtures have a combination of PCB and Non PCB ballasts along with T-12 lamps. Replacing the fixtures will remove PCB containing ballasts from the school. The dimmable system will reduce energy consumption as the sun lights the building through the existing windows. Lighting levels would be consistent with industry standards, enhancing learning while reducing energy consumption by 20%. 5/1/2009

8/1/2009

$

110,000

Bedford Schools, Temperance Road Elementary

Replace 20 year old ballasted roofs at the Temperance Road Elementary that is 5 years past its useful life. Roofs were replaced in 1989 through a bond issue. A 2007 bond issue failed due to economic conditions.

5/1/2009

8/1/2009

$

200,000

Bedford Schools, Junior High

Replace 20 year old ballasted roofs at the Junior High that is 5 years past its useful life. Roofs were replaced in 1988 through a bond issue. A 2007 bond issue failed due to economic conditions. 5/1/2009

8/1/2009

$

525,000

d e tt

t i m

Bedford Schools, Junior and Senior High

b u S

Bedford Public Schools Bedford Township

q e R

8/1/2009

P P A

st

e u

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

677 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District

Project Description

Start Date

Bedford Schools, Senior High

Replace 20 year old ballasted roofs at the Senior High that is 5 years past its useful life. The roof was replaced in 1988 through a bond issue. A 2007 bond issue failed due to economic conditions.

5/1/2009

8/1/2009

Ellis Elementary

Selective Door Replacement

5/1/2009

12/9/2009

Belding

Belding Middle School

Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: Upgrade Fire Alarm System

1/1/2010

8/31/2010

Belding

ECDD/Admin

Provide Defined Visitor Check-In Areas

5/1/2009

Belding

Alternative Education/Community Ed/Adult Ed The Building will be closed and demolished

1/1/2010

Belding

Woodview Elementary

Temperature Controls/Ventilation Upgrades

5/1/2010

Belding

Maintenance Facility

Improve Parking Area

Belding

Belding Middle School

Belding

Bedford Public Schools Bedford Township Belding Area School District Belding Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District

Project Name

Expected Completion Date

Funding Request

$

1,200,000

D VE $

21,240

$

23,600

$

32,450

PP

8/31/2010

$

59,000

12/31/2010

$

64,900

5/9/2009

8/9/2009

$

70,800

Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: Selective Door Replacements

1/1/2010

8/31/2010

$

70,800

Ellis Elementary

Temperature Controls/Ventilation Upgrades

5/1/2009

12/9/2009

$

76,700

Belding

ECDD/Admin

Replace Fire Alarm System

5/1/2009

8/1/2009

$

81,120

Belding

Woodview Elementary

Add Small Group Instruction Spaces

5/1/2010

12/31/2010

$

85,550

Belding

Woodview Elementary

PA/Phone System Upgrades

5/1/2010

12/31/2010

$

106,200

Belding

Ellis Elementary

PA/Phone System Upgrades

5/1/2009

12/9/2009

$

106,200

Belding

ECDD/Admin

Upgrade Electrical System

5/1/2009

8/1/2009

$

118,000

Belding

Ellis Elementary

Add Conference Rooms/Staff Restrooms

5/1/2009

12/9/2009

$

136,880

Belding

ECDD/Admin

Improve Parking/Student Entries

5/1/2009

8/1/2009

$

141,600

Belding

Ellis Elementary

Replace Classroom Furniture

5/1/2009

12/9/2009

$

141,600

Belding

Woodview Elementary

Replace Some Classroom Furniture

5/1/2010

12/31/2010

$

141,600

Belding

Bus Garage

Replace Parking Areas/Add Parking Lot Lighting

5/9/2009

8/9/2009

$

171,100

Ellis Elementary

Boiler & Pump Replacement

5/1/2009

12/9/2009

$

177,000

Woodview Elementary

Security Upgrades

5/1/2010

12/31/2010

$

177,000

Technology

We have had to put on hold our computer replacement - purchase of 200 computers 7/9/2009

8/9/2009

$

200,000

Woodview Elementary

Electrical Upgrades

5/1/2010

12/31/2010

$

212,400

Belding

Belding Middle School

Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: PA/Phone System Upgrades

1/1/2010

8/31/2010

$

212,400

Belding

Ellis Elementary

Technology Upgrades/Rewiring

5/1/2009

12/9/2009

$

212,400

tt i m

ub

Belding Belding Belding Belding

02262009

S

st

e u

d e t

q e R

s

A T

O N

Submitted Requests - Not Approved

O R 8/1/2009

Route (Infrastructure Only)

678 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Belding Area School District Van Buren Public Schools Van Buren Public Schools Van Buren Public Schools Van Buren Public Schools Van Buren Public Schools

Location City or Township

Project Name

Belding

Woodview Elementary

Belding

Ellis Elementary

Belding Belding

Project Description

Start Date

Expected Completion Date

Belding Middle School

Add Classrooms for Program Needs Create Separate Bus Loop/Improve Parent Drop Off/Expand Parking/Relocate Playground Equipment Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: Replace Roof

Ellis Elementary

Roof Replacement

Belding

Technology

Belding

Belding Middle School

Fiber Optic Connection so we can share services with the Ionia ISD/we currently have no means to connect to Fiber Optic and we need this infrastructure to expand our technology 5/9/2009 Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: Security Upgrades 1/1/2010

Belding

ECDD/Admin

Improve Ventilation Including AC

Belding

Belding Middle School

Belding

Funding Request

5/1/2010

12/31/2010

$

213,875

5/1/2009

8/1/2009

$

278,480

1/1/2010

8/31/2010

$

283,200

5/1/2009

12/9/2009

$

283,200

$

300,000

8/31/2010

$

354,000

5/1/2009

8/1/2009

$

424,800

Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: Technology Upgrade/Rewiring

1/1/2010

8/31/2010

$

424,800

Woodview Elementary

Add Resource Rooms and Clinic Space

5/1/2010

12/31/2010

$

427,750

Belding

Ellis Elementary

Upgrade 1970's Portion of Facility

5/1/2009

12/9/2009

$

519,200

Belding

Ellis Elementary

Replace 1920's Portion of Facility

5/1/2009

12/9/2009

$

598,850

Belding

Transportation

We have put on hold future purchases of buses - Purchase of Nine Buses

5/9/2009

5/9/2009

$

650,000

Belding

Ellis Elementary

Add Classrooms and Art Room for Program Needs

5/1/2009

12/9/2009

$

1,539,900

Belding

Belding Middle School

Middle School will become Community Ed/Adult Ed/Alternative Ed/College Building: Convert High School to Middle School: Add Permanent Walls/Upgrades in Academic Areas 1/1/2010

8/31/2010

$

2,124,000

Belding

High School

New High School Site Acquisition & Utilities

9/1/2010

8/31/2011

$

2,360,000

Belding

High School

New Outdoor Athletic Complex

9/1/2010

8/31/2011

$

7,080,000

New High School with additional new gym and larger auditorium. Alternative Ed building will be demolished they move into Middle School building and current High School converted to Middle School.

Belding

Belleville

Belleville

02262009

9/1/2010

8/31/2011

$

32,508,221

Haggerty Elementary School: replace, upgrade and install new boiler, emergency lighting, alarm system, energy efficient doors and windows, hot water heater, kitchen hood and make up air unit, energy efficient lighting. 6/1/2009

12/1/2009

$

542,000

Van Buren Public Schools, Savage Elementary School

Savage Elementarty School: replace, upgrade and install new boiler, condensing units, air handler, ductwork, exhaust, emergency lighting, alarm system, energy efficient lighting, energy efficient doors and windows.

6/1/2009

12/1/2009

$

865,000

Van Buren Public Schools, Tyler Elementary School

Tyler Elementarty School: replace, upgrade and install new boiler, condensing units, air handler, ductwork, exhaust, emergency lighting, alarm system, energy efficient lighting, energy efficient doors and windows. 6/1/2009

12/1/2009

$

865,000

t i m

ub

Belleville

S

-N

e u

q e R

Van Buren Public Schools, Haggerty Elementary School

Belleville

Belleville

d e tt

High School

s t s

T O

P P A

O R 8/9/2009

D VE

Elwell Elementary School: replace, upgrade and install new boiler, energy Van Buren Public Schools, Elwell Elementary management system, emergency lighting, alarm system, energy efficient doors and School windows, energy efficient lighting.

6/1/2009

12/1/2009

$

465,000

South Middle School: replace, upgrade and install new boiler, energy management system, energy efficient lighting, energy efficient doors and windows, toilet room remodel, locker room remodel.

5/1/2009

12/1/2009

$

1,375,000

Van Buren Public Schools, South Middle School

Submitted Requests - Not Approved

Route (Infrastructure Only)

679 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Van Buren Public Schools

Van Buren Public Schools

Benton Harbor Area Schools

Benton Harbor Area Schools

Benton Harbor Area Schools

Benton Harbor Area Schools

Belleville

Belleville

Benton Harbor

Benton Harbor

Benton Harbor

Benton Harbor

Project Name

Project Description

Van Buren Public Schools, North Middle School

North Middle School: replace roof (include new roof insulation), replace, upgrade and install new boiler, energy management system, emergency lighting, alarm system, energy efficient doors and windows. 5/1/2009

Van Buren Public Schools

improving, remodeling, and replacing the current Belleville High School, which would include equipping for technology and technology improvements, and furnishing and improving the existing site, including construction renovation and equipping of athletic fields thereon.

Benton Harbor Charles Gray Teen Center Swimming Pool Project

Enhancement of 50 year old swimming pool to promote community-wide usage by students, YWCA members, Boys and Girls Club of America and the general public, with an emphasis on a "learn to swim" program as we are surrounded by numerous bodies of water.

Benton Harbor Fair Plain Renaissance Expansion Project

BHAS is an urban school district serving a high poverty, high risk population. Since 2003 enrollment has declined, requiring the closing of some district buildings. Fair Plain Middle School is a Performing Arts Magnet. The goal is to transform the school into a "best in class" facility by adding classrooms and a state-of-the-art multipurpose performing arts center which will jointly serve the district and the community. Current educational research clearly states that students who are engaged in "The Arts" will achieve at significantly higher levels and develop leadership skills and artistic competencies. Additionally, students will have increased cognitive gains and find more personal satisfaction and growth in whatever content area is studied. 7/1/2009

Benton Harbor Charles Gray Teen Center Gymnasium Project

An addition to the existing recreation center will address the MHSAA rule enacted in the 07-08 school year which requires equal time for girls and boys sports running concurrently. The extra space will provide parity for practice and game schedules for both. 7/1/2009

Benton Harbor High School Renovation Project

Replacement of 1920s- 1950s inefficient window systems with state-of-the art energy efficient windows, thereby reducing our carbon footprint. Replacement of interior and exterior doors to comply with state and local fire codes. In addition, the new doors wil bring our building into ADA compliance and enhance the safety and security of staff and students. 7/1/2009

All Bldgs - Connect 6 rural school building via fiber optics cable and replace current failing backbone technology infrastructure to included high speed switches, routers and new computers for instructional staff.

Benzonia, MI; Honor, MI, Benzie County Central Lake Ann, MI & Schools Thompsonville, MI Benzie County Central Schools

d e t

Benzonia, MI; Honor, MI, Benzie County Central Lake Ann, MI & Schools Thompsonville, MI Benzie County Central Schools

tt i m

ub

02262009

12/1/2009

Funding Request

$

D VE

79,040,000

$

180,000

11/30/2009

$

2,500,000

8/1/2010

$

875,000

8/1/2010

$

900,000

3/15/2009

8/30/2009

$

450,000

All Bldgs - Energy conservation lighting upgrade from T-12 to T-8 Lighting and from incandescent lights to high-pressure sodium and associated ceiling repair/replacement for all 4 Elementary bldgs, High School and Middle School

6/15/2009

7/30/2009

$

275,000

Replace single pane windows and replace w/energy efficient windows in all bldgs.

7/1/2009

12/31/2009

$

725,000

Resurface and restore tennis courts

6/15/2009

8/15/2009

$

40,000

Install flooring in fitness area

6/15/2009

8/15/2009

$

14,000

Replace leaking roof section at Groves High School

6/15/2009

8/15/2009

$

130,000

Bingham Farms Elementary roof replacement

6/15/2009

8/15/2009

$

315,000

Berkshire M.S. Parking Lot replacement Modify current 2 pipe heating/cooling distribution system @ Groves to increase efficiency

6/15/2009

8/15/2009

$

650,000

6/15/2009

8/15/2010

$

100,000

s t s

-N

Submitted Requests - Not Approved

12/30/2009

P P A

e u

q e R

O R

7/1/2009

Route (Infrastructure Only)

1,552,000

$

T O

Benzonia, MI; Honor, MI, Benzie County Central Lake Ann, MI & Schools Thompsonville, MI Benzie County Central Schools Birmingham City Birmingham Public Schools - Groves High School District Beverly Hills School Birmingham City Birmingham Public Schools - Groves High School District Beverly Hills School Birmingham City Birmingham Public Schools - Groves High School District Beverly Hills School Birmingham City Birmingham Public Schools - Bingham Farms School District Beverly Hills Elementary Birmingham City School District Beverly Hills Birmingham Public Schools - Berkshire M.S. Birmingham City Birmingham Public Schools - Groves High School District Beverly Hills School

S

Start Date

Expected Completion Date

680 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Birmingham City School District Birmingham City School District Birmingham City School District Crossroads Charter Academy Crossroads Charter Academy Birmingham City School District Birmingham City School District Birmingham City School District Birmingham City School District Birmingham City School District Birmingham City School District Birmingham City School District Birmingham City School District

Location City or Township Beverly Hills Beverly Hills Beverly Hills Big Rapids Big Rapids Birmingham

Project Name Birmingham Public Schools - Groves High School Birmingham Public Schools - Groves High School Birmingham Public Schools - Groves High School Crossroads Charter Academy Mobile Computer Lab Crossroads Charter Academy K-6 Computer Lab Birmingham Public Schools - Pierce Elementary

Project Description Modify Exterior Concession Stand at Groves to comply with Health Department Regulations

6/15/2009

8/15/2009

$

74,359

Modify Interior Concession Stand at Groves to meet Health Dept regulations.

6/15/2009

8/15/2009

$

84,320

8/15/2009 1 month after approval 2 months after approval

$

120,000

$

12,000

$

15,000

8/15/2009

$

100,000

8/15/2009

$

350,000

6/15/2009

8/15/2009

$

60,000

6/15/2009

8/15/2010

$

100,000

6/15/2009

8/15/2009

$

38,900

6/15/2009

8/15/2009

$

70,992

6/15/2009

8/15/2009

$

161,766

6/15/2009

8/15/2009

$

600,000

7/1/2010

$

13,350,000

12/1/2010

$

25,000,000

Replace damaged central chiller at Groves High School 6/15/2009 Purchase 20 laptop computers and necessary equipment to create a mobile lab that could be used in either building ASAP Current K-6 Computer Lab is outdated and does not allow students to use technology as a key component for learning ASAP Rebuild and update student elevator at Pierce Elemenetary School

9/1/2008

Derby M.S. Parking lot replacement

6/15/2009

Birmingham

Birmingham Public Schools - Derby M.S. Birmingham Public Schools - Seaholm High School Birmingham Public Schools - Seaholm High School Birmingham Public Schools - Seaholm High School Birmingham Public Schools - Seaholm High School Birmingham Public Schools - Seaholm High School

Birmingham

Birmingham Public Schools- District-wide

Replacing floor covering in all of the School Buildings

Blissfield

Project consist of improvements to heating and ventilation systems, potable water heating , windows, doors, and improvements to lighting efficiency. Many of the existing mechanical systems have been identified by the” Rebuild Michigan Program” to be in failure status and extremely inefficient relating to energy and functionality.The High performance design will incorporate geothermal HVAC system to address Blissfield Community Schools: Middle School heating and indoor air quality issues. Energy manangement software that will control Sustainable Energy Project - building code HVAC systems and interior/ exterior lighting. Included will be exterior insulation, 00607 energy efficient windows and doors, and natural daylighting. 3/1/2009

Blissfield

The scope of this project is to renovate a 50 year old high school building into a high performance learning center through green and sustainable concepts. Many of the existing mechanical systems have been identified by the” Rebuild Michigan Program” to be in failure status and extremely inefficient relating to energy and functionality. Plans include converting our existing flat roof to a pitched roof allowing for insulation and better water management.A geothermal HVAC system utilizing renewable energy source will be used to reduce operating costs and carbon emissions. Energy management software that will control HVAC systems and interior/ exterior lighting. Improvements to the building envelope include insulation to the exterior walls and energy efficient windows and doors. Our sustainable building design addresses poor indoor air quality and lack of natural daylighting. Poorly functioning sewer and water lines are to be updated with high performance water conservation equipment. Abatement of all asbestos containing material and updates to fire /security alarm equipment is included.Landscaping will also be address as to eliminate the use of pes4/1/2009

Birmingham Birmingham Birmingham Birmingham Birmingham

A T

Resurface and restore track surface Modify current 2 pipe heating/cooling distribution system @ Seaholm to increase efficiency Install flooring in fitness area

d e tt

t i m

Blissfield Community Schools

b u S

02262009

Blissfield Community Schools: High School Renovation - building code 00353

O N

Modify Interior Concession Stand at Seahollm to meet Health Dept regulations. Modify Exterior Concession Stand at Seaholm to comply with Health Department Regulations

q e R

s

st

e u

Blissfield Community Schools

Start Date

Expected Completion Date

Submitted Requests - Not Approved

PP

O R

Funding Request

D VE

Route (Infrastructure Only)

681 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Blissfield Community Schools

Blissfield Community Schools Blissfield Community Schools

Blissfield Community Schools

Blissfield Community Schools Birmingham City School District Birmingham City School District Romeo Community Schools

Buchanan Community Schools Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District

Project Name

Project Description

Start Date

Blissfield

Blissfield Community Schools: Playground Safety Improvements

Aging playgrounds and equipment will be updated to meet current safety standards utilizing green and sustainable products. The design incorporates equipment manufactured from recycled plastic, steel and rubber.The design layout and location further reduces the need for pesticides and herbicides. 4/1/2009

Blissfield

Blissfield Community Schools Main Campus Infrastructure

Aging and reduced flow of sanitary and storm water lines are addressed in this project. In addition, unsafe conditions of high voltage electrical service lines are included. Failing pavement will be replaced for traffic flow improvement

4/1/2009

Blissfield Community Schools:Main Campus Communication

Overextended telephone service, fire alarm systems, internet, and video distribution systems will be repaired / replaced. Much of the existing wiring is in a deteriorating condition

4/1/2009

Blissfield Community Schools: Elementary Sustainable Energy Project- building code 00587

This project is to address existing mechanical systems, which have been identified by the” Rebuild Michigan Program” , to be in failure status and extremely inefficient relating to energy and functionality. Energy cost to support the Life-Science lab have escalated due to aging equipment.The High performance design will incorporate geothermal HVAC system to address heating and indoor air quality issues. Energy manangement software that will control HVAC systems, interior and exterior lighting.Improvements to the building envelope will include exterior insulation, energy efficient windows and doors, and natural daylighting. Improvements to water and sewer lines will be accomplished utilizing water saving equipment. 4/1/2009

Blissfield

Blissfield

Blissfield Bloomfield Hills Bloomfield Hills Bruce Township

Buchanan

tt i m

Buena Vista Township

S

Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township

02262009

$

1,375,000

12/1/2009

$

1,850,000

6/1/2010

$

14,200,000

4/1/2009

12/1/2009

$

200,000,000

6/15/2009

8/15/2009

$

480,000

Replace entire roof at Meadow Lake Elementary 6/15/2009 Upgrade / Replace HVAC systems and associated controls to achieve greater energy efficiency 6/9/2009

8/15/2009

$

600,000

9/9/2009

$

1,800,000

The proposed facility infrastructure imporvements will reduce our energy consumption from $0.99 per square foot to $0.80 per square foot. This is a potential savings of $50,053.00 per year if we focus on our three least efficient buildings. EMCOR will selfperform the total project which keeps costs low by avoiding double mark up. A complete description of the proposed improvements is attached. See pages 1-7 90 Days

12 months

$

1,872,210

Update and upgrade temperature control system

5/15/2009

6/10/2009

$

20,000

Update and upgrade temperature control system

5/15/2009

6/10/2009

$

45,000

Update and upgrade temperature control system

5/15/2009

6/10/2009

$

50,000

Update and upgrade temperature control system

5/15/2009

6/10/2009

$

95,000

Energy-saving light retro-fit (complete replacement of ballasts)

3/15/2009

6/15/2009

$

23,000

Energy-saving light retro-fit (complete replacement of ballasts)

3/15/2009

6/15/2009

$

25,000

-N

e u

Replace leaking roof section at West Maple Elementary School

Submitted Requests - Not Approved

O R

P P A

This project will address energy consumption, plumbing, lighting inefficiencies, and other equipment updates. Included is replacement of the aging building which incorporate natural lighting, energy efficient HVAC equipment, and other energy saving building components. Energy manangement software that will control HVAC systems, interior and exterior lighting.

q e R

Buchanan Community Schools Guaranteed Energy Savings Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Brunkow Elementary Buena Vista School District- Ricker Middle School Buena Vista School District- Buena Vista High School Buena Vista School District- Ricker Middle School Buena Vista School District- Brunkow Elementary

ub

Buena Vista Township

d e t

D VE

300,000

s t s

9/1/2009

Funding Request

$

T O

Blissfield Community Schools: Bus Garage Renovation Birmingham Public Schools - West Maple Elemenatary Birmingham Public Schools - Meadow Lake Elementary School Romeo Community School / Romeo High School

Expected Completion Date

6/1/2011

Route (Infrastructure Only)

682 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Buena Vista School District Atherton Community Schools Atherton Community Schools

Atherton Community Schools Atherton Community Schools Atherton Community Schools Atherton Community Schools Atherton Community Schools

Location City or Township

Buena Vista Township

Project Name Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Buena Vista High School Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Brunkow Elementary Buena Vista School District- Ricker Middle School Buena Vista School District- Buena Vista High School Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Buena Vista High School Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Brunkow Elementary Buena Vista School District- Ricker Middle School Buena Vista School District- Doerr Early Childhood Center Buena Vista School District- Brunkow Elementary Buena Vista School District- Buena Vista High School Buena Vista School District- Ricker Middle School Buena Vista School District- Ricker Middle School

8/15/2009

$

194,000

Burton, MI

Update Outdoor Sports Facilities -Atherton Build a track that is used by members of the community; install energy efficent lights High School (HS); Middle School (MS); & Van around the outdoor sports facilities; build an outdoor bathroom facility and concession Y Elementary (VY) stand 6/1/2009

10/1/2009

$

1,000,000

Burton, MI

Technology Upgrades - Atherton High School (HS); Middle School (MS); & Van Y Technology Upgrades. Potential projects would include upgrades of all computers in Elementary (VY) district, wireless internet access, energy efficient lights, upgraded telephone system 6/1/2009

8/1/2009

$

1,000,000

Burton, MI

Upgrade and Repair Locker rooms & Restrooms - Atherton High School (HS); Install new toilets and sinks that are more energy efficient. Put new lockers and Middle School (MS); & Van Y Elementary (VY) showers in the locker rooms of the HS and MS.

ASAP

8/1/2009

$

200,000

4/1/2009

8/1/2009

$

3,000,000

6/1/2009

8/1/2009

$

50,000

6/1/2009

8/1/2009

$

200,000

ASAP

8/1/2009

$

20,000

Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township Buena Vista Township

Burton, MI

Burton, MI

02262009

Start Date

t i m

3/15/2009

6/15/2009

$

25,000

Energy-saving light retro-fit (complete replacement of ballasts)

3/15/2009

6/15/2009

$

65,000

Replace Doors and Hardware with sealant/weather-stripping

3/15/2009

4/15/2009

$

75,000

Replace Doors and Hardware with sealant/weather-stripping

3/15/2009

4/15/2009

$

100,000

Replace Doors and Hardware with sealant/weather-stripping

3/15/2009

$

150,000

Replace Doors and Hardware with sealant/weather-stripping

3/15/2009

$

175,000

Separate storm and sewer

PP

4/15/2009

5/1/2009

6/1/2009

$

140,000

3/15/2009

8/15/2009

$

250,000

3/15/2009

5/15/2009

$

12,000

3/15/2009

5/15/2009

$

18,000

3/15/2009

5/15/2009

$

32,000

3/15/2009

8/15/2009

$

45,000

3/15/2009

8/15/2009

$

50,000

3/15/2009

4/15/2009

$

70,000

3/15/2009

8/15/2009

$

120,000

4/15/2009

A T

Homeland security upgrades Replace public announcement system Replace public announcement system Replace public announcement system

s

Homeland security upgrades

st

Homeland security upgrades

e u

Replace public announcement system Homeland security upgrades

eq

O N

Replace broken and leaking glass block in gymasium

R d

ub

Energy Efficient Roofs - Atherton High School (HS); Middle School (MS); & Van Y Elementary (VY) Put Energy Efficient Roofs on all three buildings in the District

S

Funding Request

Energy-saving light retro-fit (complete replacement of ballasts)

e t t

Burton, MI

Burton, MI

Project Description

Expected Completion Date

Playground Equipment - Atherton High School (HS); Middle School (MS); & Van Y Purchase Playground Equipment for MS and VY schools to provide a safer more Elementary (VY) enjoyable place for students and the community to play. Atherton High School (HS); Middle School (MS) Upgrade Stages in Cafetaria's of both HS & MS. Purchase Classroom Calculators - Atherton High School (HS); Middle School (MS); & Van Purchase Classroom Calculators (K-12) for instructional and practical use. Y Elementary (VY)

Submitted Requests - Not Approved

O R 4/15/2009

D VE

Route (Infrastructure Only)

683 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Atherton Community Schools

Burton, MI

Science Labs & Equipment Upgrade -Atherton High School (HS); Middle School (MS); & Van Upgrade Science Labs & Equipment in all three of our schools. Purchase science Y Elementary (VY) equipment for better and more relevant instruction.

Byron Area Schools Byron Area Schools

Byron Byron

Byron Area Schools-Byron Elementary School Construct an outdoor classroom for science experiments. Bus Fleet We need to update our bus fleet. The average fleet age is over 10 years

ASAP

8/1/2009

May, 2009 May, 2009

Aug, 2009 Sept, 2009

Byron Area Schools

Byron

Tecnology Upgrades

Byron Area Schools

Byron

Sidewalk Repairs

The technology available to our students and staffs is out of date. We will install new teaching stations, work stations, LCD projectors, smartboards, new servers, and new cabling to provide ready access to technolgy as a teaching and learning tool. May, 2009 Our school district would like to replace existing sidewalks with new sidewalks. Current walks are uneven and represent a trip hazard May, 2009

Byron Area Schools

Byron

Parking Lot Repairs

Our school district would like to replace existing parking surfaces with new surfaces. May, 2009

Caledonia Community Schools-utility grade wind turbine Calumet AC, Energy Replacement and Ventilation Improvements

Caleonia Community Schools passed a bond issue in May 2007. We hope to build a new Elementary school, renovate other schools, provide technology upgrades and construct a wind turbine to power our buildings. Our request is for matching funds or supplemental funds to support the wind turbine project. We earmarked 1 million for this project but supply and demand has driven the price up 50-70% more than when we applied to the Michigan Treasury Dept in January of 2007 for a school bond. This is a shovel ready project with current money ready to go to an RFP. We hope to build a 1-1.5 mega watt turbine to make our school green and to off-set the utility costs. We have community support for such a project and the community voted for this millage in May of 2007. This wind turbine will also be the main focus of our new environmental studies curriculum. Spring 2009 Install air conditioning and energy replacement systems and make improvements to current ventilation system. 4/1/2009

Calumet Wood Storage Facility

Building to store wood chips for heating plant

A T

Caledonia Community Schools Caledonia Public Schools Of Calumet Calument Public Schools Of Calumet Calumet Public Schools Of Calumet

Public Schools Of Calumet Public Schools Of Calumet

Public Schools Of Calumet

Calumet

Calumet

Calumet

02262009

$

D VE

5,000 800,000

$

180,000

July, 2009

$

30,000

July, 2009

$

150,000

Winter 2009-2010

$

2,000,000

8/1/2009

$

2,500,000

Sept, 2009

O N

7/1/2009

$

500,000

10/1/2009

$

750,000

Calumet Heating Plant

The Combined Heat and Power Cogeneration Plant would utilize a solid fuel (multi-fue capable) high pressure boiler rated at 120,000 - 140,000 pounds per hour, capable of burning wood chips and coal integrated with a 7-10 megawatt extraction steam turbine capable of producing the required local schools, township, hospital and businesses thermal and electrical needs. The plant would increase energy efficiency; increase the dependability of electricity availability; utilize renewable resources, and provide for use of diversified fuel sources. In addition, the plant would create new jobs (estimate 50 new jobs in the wood industry), the plant would reduce the dependency on foreign oil and natural gas, provides a market for small wood supplies waste wood products, and benefits the environment due to increased efficiency of producing steam and electricity by using CHP Cogeneration technology. 2/1/2009

9/1/2010

$

55,000,000

Calumet Lighting Replacment

Replace antiquated lighting system in all district buildings to a more modern and energy efficient system. A new lighting system will improve visual acuity, decrease maintenance and energy costs dramatically.

2/1/2009

8/1/2009

$

295,000

Calumet Mohawk heating Plant

The proposed plant would burn wood chips and wood by products of the Keweenaw Peninsula wood products industry, for example, tree tops, sawdust, and bark. This heating system would reduce operational costs and increase energy efficiency.

4/1/2009

11/1/2009

$

500,000

Calumet Inter-Connect Addition and Improvement

d e t

b u S

q e R

Route (Infrastructure Only)

125,000

$ $

O R

PP

Funding Request

Construct a atrium and gathering area between the high school and middle school so students, parents and community members have a place on the school campus to gather, hold meetings and have community events. 4/1/2009

tt i m

Calumet

e u

st

s

Expected Completion Date

Submitted Requests - Not Approved

4/1/2009

684 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Public Schools Of Calumet Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools Camden-Frontier Schools

Location City or Township

Project Name

Funding Request

Calumet Roofing Project

Replace four aging roofs on an elementary, middle, high and alternative school

4/9/2009

8/9/2009

$

800,000

Camden/Woodbridge

Camden-Frontier

New aerators for existing lagoon

6/1/2009

10/1/2009

$

10,000

Camden/Woodbridge

Camden-Frontier

Whiteboards with projectors for 37 rooms.

6/1/2009

9/1/2009

$

89,000

Camden/Woodbridge

Camden-Frontier

Entry doors to all classroom to be fireproof and security

6/1/2009

10/1/2009

$

150,000

Camden/Woodbridge

Camden-Frontier

Agriculture Building - Ag Science classes and Greenhouse

6/1/2009

$

750,000

Camden/Woodbridge

Camden-Frontier

New 6" water well to help take the burden off our old one

6/1/2009

$

30,000

Camden/Woodbridge

Camden-Frontier

Replace Exit fire doors - 11 singles & 2 doubles

6/1/2009

9/1/2009

$

40,000

Camden/Woodbridge

Camden-Frontier

Playground resurfacing (soft blow)

PP

9/1/2009

6/1/2009

9/1/2009

$

50,000

Camden/Woodbridge

Camden-Frontier

Carpet 37 classrooms

6/1/2009

8/1/2009

$

75,000

Camden/Woodbridge

Camden-Frontier

New boiler/heat exchanger to help with the other boiler.

6/1/2009

9/1/2009

$

100,000

Camden/Woodbridge

Camden-Frontier

Wireless access points (20)

6/1/2009

9/1/2009

$

8,000

Camden/Woodbridge

Camden-Frontier

Audio System for the gymnasium for elementary programs

6/1/2009

9/1/2009

$

25,000

Camden/Woodbridge

Camden-Frontier

Transportation Garage (10 bays/equipment)

6/1/2009

10/1/2009

$

950,000

Camden/Woodbridge

Camden-Frontier

Construction of 4 new elementary classroom

6/1/2009

12/1/2009

$

1,000,000

Camden/Woodbridge

Camden-Frontier

Upgrade boiler room or storage

6/1/2009

9/1/2009

$

15,000

Camden/Woodbridge

Camden-Frontier

Wireless mobile laptop carts for a 24 computer cart x 4 units

6/1/2009

9/1/2009

$

28,800

Camden/Woodbridge

Camden-Frontier

Camden/Woodbridge

Canton Twp.

Carrollton

02262009

st

e u

eq

s

A T

O N

R d

Replacement/Surfacing blacktop in parking areas

O R 10/1/2009

D VE

6/1/2009

8/1/2009

$

180,000

Roof repairs over existing building. Repairs would include all purpose room, common area, elem office and hallway, north high school section, art room, media center, weight room and administrative office. 6/1/2009

9/1/2009

$

350,000

Universal Academy

The project is a new Pre-K-12 school building for 750 students that will provide room for 300 new student enrollees. The remaining 450 students will transfer from another existing site. The school is designed by a LEEDs certified architect firm. Its advanced learning environment contains new science, math, computer and library rooms along with up to date technology, materials and software. Technology is embraced throughout the school. The student body is Title I eligible and 100 percent of current enrollees receive free or reduced lunches. More than 95 percent of the student body have persons at home who are not native English speakers. Outstanding energy saving features of the 78,000 square foot facility include adjustable light and body heat-detecting sensors in all classrooms, self-powered flushing and washing water, a 90 percent efficiency HVAC system, motion-sensing exterior security cameras, a storm water pond retention system, and extensive tree plantings around the site. All energy savings will be applied to student academic programs. Sets of four recycling bins are located in the cafeteria and throughout the bMay, 2009

August, 2010

Carrollton Public Schools

Develop pilot project with Saginaw Valley State University on alternative fuel measures to decrease energy consumption; pilot would be designed for study and possible replication in other schools

December, 2010

$

1,500,000

e t tt

Camden-Frontier

b u S Carrollton School District

Start Date

Calumet

i m

Universal Academy

Project Description

Expected Completion Date

Submitted Requests - Not Approved

11/1/2009

Route (Infrastructure Only)

685 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Carrollton School District Carrollton School District

Carrollton School District

Carrollton School District

Carrollton School District

Carrollton School District Carrollton School District Carrollton School District Carrollton School District Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools

Project Name

Project Description

Start Date

Carrollton

Carrollton Public Schools

Carrollton

Carrollton Public Schools

600 seat performing arts center, LEED certified, approximately 40,000 square feet., to be attached to the high school but used by all grades. This will serve community groups, as well. WE CURRENTLY HAVE NO SUCH FACILITY IN CARROLLTON. 6/1/2009 Construct a completely efficient and working greenhouse at the high school for the purpose of student learning 4/1/2009

Carrollton Public Schools

Upgrade outdoor athletic facilities to reclaim rain and gray water to supplement the irrigation system; add a wind powered well pump to supply the irrigation water for the firlds; eliminate dependency on municipal water system; long-term payback to district 6/1/2009

Carrollton Public Schools

Replace 10,000 sq. ft. of classroom carpeting with L.E.E.D. approved green linoleum tile flooring; all natural matierial; completely recyclable; improve air quality; help increase water conservation and decrease energy usage; local vendors available 4/9/2009

Carrollton Public Schools

Expand classroom technology, including computer-assisted instruction to reach a wide range of learning styles and abilities. Work to be done in partnership with Saginaw Valley State University and Saginaw Intermediate Schools; pilot projects can be developed and offered to other schools ASAP

Carrollton

Carrollton

Carrollton

Carrollton

Carrollton Public Schools

Carrollton

Carrollton Public Schools

Carrollton

Carrollton Public Schools

Carrollton

Carrollton Public Schools Carson City-Crystal Area Schools, High School and Middle School

Carson City Carson City

Carson City

ub

Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis

02262009

S

st

e u

6/10/2009

O N

Funding Request

$

13,400,000

$

30,000

$

250,000

5/23/2009

$

60,000

10/1/2010

$

450,000

9/2/2009

$

500,000

D VE

Sept. 2, 2009

O R

PP

Complete on-going district-wide electrical energy conservation project stalled due to lack of funding; retrofit old T-12 lighting with T-8 and T-5 in classrooms and hallways; use photocell lighting on exterior lighting replacing inefficient timers along with motion sensors in storeroom and closets; Vendmisers would be installed on all vending machines to regulate lights and cooling; put in place an energy management system to tie all district HVAC system together; controlling to maximum efficiency. 3/2/2009 Purchase of three new buses to provide additional routes/trips for students and athletes. ASAP

10/30/2009

8-10 weeks

$

225,000

Complete interior door replacement project that started as a pilot project in the high school; many doors in the district are old, insecure & unsafe (especially nonfunctioning fire doors) and in need of replacement 5/1/2009 Upgrade science laboratories in district, in conjunction with local college and business leaders 4/1/2009

9/1/2009

$

300,000

Sept. 2, 2009

$

400,000

Window replacement for energy purposes. 39 full energy efficient windows.

June, 2009

August, 2009

$

80,000

Replace 15 year old school bus with an energy efficient propane bus.

May, 2009

August, 2009

$

95,000

Pave bus loading zone for our central hub.

May, 2009

August, 2009

$

80,000

Replace existing deteriorating sidewalk which is a hazard.

May, 2009

August, 2009

$

100,000

Masonry Tuckpointing, clean and seal

5.1.09

8.1.09

$

74,000

Boiler replacement

5.1.09

8.1.09

$

62,000

Door replacement

5.1.09

8.1.09

$

77,000

Door replacement

5.1.09

8.1.09

$

132,000

Masonry Tuckpointing, clean and seal

5.1.09

8.1.09

$

132,000

Masonry Tuckpointing, clean and seal

5.1.09

8.1.09

$

185,000

q e R

Carson City-Crystal Area Schools Carson City-Crystal Area Schools, High School and Middle School Carson City-Crystal Area Schools, High School and Middle School Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Ross Beatty Jr./Sr. High School

tt i m

Carson City

d e t

A T

s

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

686 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Cassopolis Public Schools Chassell Township School District Chassell Township School District Chassell Township School District Chassell Township School District Chassell Township School District Chassell Township School District Chassell Township School District

Location City or Township Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis Cassopolis

Project Name Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Ross Beatty Jr./Sr. High School Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Frank Squires Elementary Cassopolis Public Schools Sam Adams Elementary Cassopolis Public Schools Cassopolis Public Schools Frank Squires Elementary

Cassopolis Cassopolis

Project Description Electrical system upgrades including sub-panels, lighting upgrades, emergency equipment, energy management system, and intercom system Electrical system upgrades including sub-panels, lighting upgrades, emergency equipment, energy management system, and intercom system

Start Date

Expected Completion Date

5.1.09

8.1.09

$

250,000

5.1.09

8.1.09

$

282,000

$

295,000

$

330,000

$

534,000

8.1.09

$

660,000

8.1.09

$

748,000

5.1.09

8.1.09

$

50,000

5.1.09

8.1.09

$

60,000

5.1.09

8.1.09

$

65,000

5.1.09

8.1.09

$

169,480

5.1.09

8.1.09

$

250,000

5.1.09

8.1.09

$

305,451

5.1.09

8.1.09

$

414,600

Boiler replacement Electrical system upgrades including sub-panels, lighting upgrades, emergency equipment, energy management system, and intercom system

5.1.09

8.1.09

5.1.09

8.1.09

Window replacement

5.1.09

Window replacement

5.1.09

Window replacement

5.1.09

A T

Toilet Fixture and accesibility improvements Toilet Fixture and accesibility improvements Parking lot asphalt clean and seal Polymer Slate Roof

s

O N

Funding Request

PP

O R 8.1.09

D VE

Cassopolis

Cassopolis Public Schools Install fiber cables between buildings Cassopolis Public Schools Ross Beatty Jr./Sr. High School Polyurethane coating Cassopolis Public Schools Sam Adams Elementary Polymer Slate Roof

Cassopolis

Cassopolis Public Schools

Technology cabling and equipment

5.1.09

8.1.09

$

750,000

Chassell Township

Chassell Township Schools

Library and cafeteria expansion

3/1/2009

8/1/2009

$

141,400

Chassell Township

Chassell Township Schools

3/1/2009

9/1/2009

$

533,960

Chassell Township

Chassell Township Schools

Wood shop renovation and metal shop/ computer aided design addition Secured entry way addition, keyless entry system, replace exterior door hardware, update fire alarm and emergency lighting, extend intake hoods.

Immediate

7/1/2009

$

558,039

Chassell Township

Chassell Township Schools

Add 2 classrooms

3/1/2009

11/1/2009

$

602,000

Chassell Township

Chassell Township Schools

Roof Replacement

4/1/2009

6/1/2009

$

624,008

Chassell Township Schools

Create a bus loop for security reasons

4/1/2009

7/1/2009

$

756,000

Chassell Township Schools

New gymnasium, including site work and locker rooms

3/1/2009

9/1/2009

$

3,312,400

Chelsea School district-Pierce Lake Elementary School Renovation

Refinish exterior entry decking, cooling tower replacement, upgrade HVAC equipment and energy management controls, replace furniture, new window blinds, electrical upgrades. On site, repave parking lots, drives and playground, replace playground soft surfacing and equipment, landscaping. TBD

TBD

$

766,250

TBD

$

1,432,270

Cassopolis

m b u

Chassell Township Chassell Township

Chelsea School District Chelsea

Chelsea School District Chelsea

02262009

S

e u

eq

R d

e t t

it

st

Roof replacement, building finishes and casework replacement, boiler replacement, upgrade HVAC equipment and energy management controls, replace drinking fountains, electrical upgrades, pool equipment, new café tables and office furniture. Chelsea School District-Beach Middle School On site, repave bus transfer lot, replace sidewalks, resurface tennis courts, landscaping. Renovation

Submitted Requests - Not Approved

TBD

Route (Infrastructure Only)

687 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Chelsea School District Chelsea

Chelsea School District Chelsea L'anse Creuse Public Schools Chesterfield Twp. L'anse Creuse Public Schools Chesterfield Twp. L'anse Creuse Public Schools Chesterfield Twp. L'anse Creuse Public Schools Chesterfield Twp. Forest Park School City of Crystal Falls, District Michigan Forest Park School City of Crystal Falls, District Michigan Forest Park School City of Crystal Falls, District Michigan Essexville-Hampton City of Essexville and Public Schools Hampton Township Essexville-Hampton City of Essexville and Public Schools Hampton Township

Clare Public Schools

Clare

Clare Public Schools

Clare

02262009

Start Date

Bldg. 500 roof replacement, replace finishes, replace HVAC equipment, remodel restrooms (bldg. 500, 400, 300), remodel gym and mezzanines, replace doors and windows bldg. 400, add entry canopies bldg. 100, add ramp to stage. On site, repave parking lot, new irrigation system, replace playground surfacing and equipment, resurface track, replace sidewalks, add sidewalks, replace plumbing fixtures at stadium, new parking lot lighting, landscaping. TBD

TBD

$

2,702,236

TBD

$

2,866,965

Gymnasium and music room addition, replace windows, new roofing, replace boilers, upgrade HVAC equipment and energy management system, electrical upgrades, replace kitchen equipment, new window blinds. On site, repave parking lot, extend storm drain system, replace playground surfacing and equipment, landscaping. 8/1/2009

8/30/2010

$

4,066,325

LCPS Higgins Elementary Roof Replacement LCPS Higgins Elementary Hallway Door Modifications LCPS Burdi Center North Offices HVAC Modifications LCPS Chesterfield Elementary Gym & Classroom Addition

Replace worn-out roof

6/1/2009

11/1/2009

$

300,000

6/1/2009

9/1/2009

$

4,000

Enhance heating to meet district standards 6/1/2009 Construction of a gymnasium and classroom addition, as well as renovation of existing building 4/1/2009

9/1/2009

$

5,000

8/1/2010

$

5,363,000

Forest Park Energy Efficiency

Remove and replace light switches in 106 rooms with energy efficient light sensors. 2/1/2009 Remove and replace 3 domestic hot heaters for our entire heating/boiling system with energy efficient units. 2/1/2009 Remove and replace 22 exterior windows with new state of the are energy efficient windows in the high school facility which is 39 years old 3/1/2009 Replace existing locks on main doors at all buildings with computer controlled keyless entry systems to improve district security. 6/15/2009

4/1/2009

$

6,360

4/1/2009

$

22,500

8/1/2009

$

47,960

8/15/2009

$

48,400

8/15/2009

$

100,000

Forest Park Energy Efficiency Forest Park Energy Efficiency Essexville - Hampton Essexville - Hampton

tt i m

d e t

A T

s

Replace antiqued fire-safety devices on doors

e u

st

q e R

O N

Install LCD projectors in classrooms to aid in the delivery of curriculum.

PP

O R

6/15/2009

8/15/2009

$

40,000

Clare Public Schools - Alternative Ed.

Provide addequate foundation and brick work for newer bulding. This would make the new building more eye appealing and safer for the long term of the building. This would provide a better soloution than leaving it a dirt foundation with footers where animals or other vermin could live. 6/8/2009 Provide furnishings for the above new building to help the students learn in a better classroom environment with the least possible of distraction. 6/8/2009

8/15/2009

$

50,000

Clare Public Schools - Alternative Ed.

Removal of existing 40 year old portables and replacing with a newer building. The new building would be more energy efficient including daylighting for better student learning and retention. The new building would more secure for the safety of the students and less dangerous for the students and staff. Currently we serve three counties, Isabella, Clare and Gladwin and are home to over 100 students who need our service.

8/15/2009

$

365,000

Clare Public Schools - Alternative Ed.

b u S

Submitted Requests - Not Approved

6/8/2009

Route (Infrastructure Only)

D VE

1,702,394

Chelsea School district-South Meadows Elementary School Renovation

TBD

Funding Request

$

Remodel weight room, remodel storage in scene shop, replace flooring, upgrade HVAC equipment and energy management controls, electrical upgrades, replace exterior door hardware, replace toilet partitians, paint gym and receiving ceilings. On Chelsea School District-Chelsea High School site, Repave parking lots, irrigation system, resurface tennis courts, replace Renovation sidewalks, landscaping. TBD Chelsea School district-Transportation Center Bus wash bay building addition with storage, replace HVAC units. On site, repave Renovation parking lots, new electric gate. TBD

Chelsea School District Chelsea

Clare

Project Description

Chelsea School District-Washington Street Education Center Renovation

Chelsea School District Chelsea

Clare Public Schools

Project Name

Expected Completion Date

688 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clare-Gladwin Resd

Clare

Project Name

Project Description

Health Science and Career Tech training center improvements and addtions to support the Clare-Gladwin Career Tech programs and Health Science Middle College programs for the local school districts served by the Clare-Gladwin RESD. This new center would support our partnership with Mid Michigan Community College to suppor areas of need for the communities of Clare and Gladwin Counties, which are 2 of the state's highest poverty areas. The programs included would be electronics, welding, allied-health specialties, multi-media technology, web design and "green" technologies. 4/30/2009

Clare-Gladwin RESD

Clare-Gladwin Resd Macomb ISD

Clare Clinton Township

Clare-Gladwin RESD Neil E. Reid High School

Macomb Academy

Clinton Township

Macomb Academy (PSA)

Start Date

The Clare-Gladwin Regional Education Service District and its local districts have a vision of improving the way in which we deliver student curriculum with state of the art technology. Most school districts around the country deliver content with traditional PC/Mac based computer systems. While many utilize server-based technology, Clare Gladwin RESD is promoting a new computing environment that can more efficiently use computer technology. By structuring technology in a more centralized fashion, local school districts will be able to more effectively teach students using the technologies they will use after graduation. This would require new hardware and software to implement. For over a decade, Clare-Gladwin RESD and the local districts within the RESD, have been working towards this technology model by constructing a region-wide fiber optic plant. Since the mid 1990’s, we have been using the fiber plant to bring in distance learning and the Internet to all of the local districts within the RESD. To prepare the infrastructure for this new approach to technolgy based learning, a redundant interconnection to each school district is neede3/31/2009 Replace windows and doors with energy efficient type Macomb Academy, remove and replace existing classroom and corridor lighting with new high effiecency T-5 technology fixtures.. 6/1/2009

T O

s t s

-N

e u

Macomb Academy

Clinton Township

Macomb Academy (PSA)

Macomb ISD

Clinton Township

Macomb ISD - ESC

Macomb Academy (PSA) Macomb ISD - ESC

Macomb Academy, remove and replace 48 existing aluminum and glass window openings and doors and replace with new insulated low-e glass and thermally broken systems to conserve energy. 6/1/2009 Modernize HVAC controls with energy efficient. D.D.C. equipment

Clinton Township Clinton Township

b u S

Macomb Academy Macomb ISD Macomb ISD Macomb ISD

Clinton Township Clinton Township Clinton Township Clinton Township

Macomb Academy (PSA) Neil E. Reid High School Macomb ISD - ESC Macomb ISD - ESC

Macomb Academy Macomb ISD

Clinton Township Clinton Township

Macomb Academy (PSA) Neil E. Reid High School

02262009

R d

e t tt

i m

eq

Macomb Academy offers a curriculum tailored to the Special Needs population. The Academy is a school-to-work transitional program focusing on life skills and employment training. Macomb Academy has been issued (Bonds) to finance the purchase of and renovations to the Facilities. The work consists of but is not limited to the following: Selective demolition of existing interior and exterior areas, New construction of interior classrooms and toilet rooms, mechanical and electrical infrastructure upgrades and replacements, in addition, corresponding plumbing, HVAC, and electrical work is also a part of the new work. 6/1/2009 Replace boilers, HVAC system and controls with energy efficient type. Renovate storm water handling and drainage Renovations third floor for classroom. Macomb Academy, provide closed circuit cameras and monitor system with building access controls for facility and student safety. 6/1/2009 Renovate food service kitchen.

Submitted Requests - Not Approved

3/31/2010

Funding Request

D VE $

500,000

9/30/2010 8/10/2009

$ $

2,000,000 1,200,000

9/1/2009

$

65,000

9/1/2009

$

75,000

8/9/2009

$

80,000

9/1/2009 12/9/2009

$ $

155,500 300,000

9/1/2009 10/9/2009 8/10/2009 8/11/2009

$ $ $ $

447,510 500,000 750,000 3,000,000

9/1/2009 8/9/2009

$ $

40,000 50,000

O R

Route (Infrastructure Only)

P P A

Macomb Academy, reroof approximately 8000sf of existing shingle sloped roof, provide new roof sheathing where necessary and provide approximately 10,000sf new R-30 attic insulation . Provide new storm water management system. 6/1/2009 Renovate restrooms including low flow water filters/ADA compliace and touchless equipment.

Macomb Academy Macomb ISD

Expected Completion Date

689 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Macomb Academy Clinton Township Macomb ISD Clinton Township Clintondale Community Schools Clinton twp L'anse Creuse Public Schools Clinton Twp. L'anse Creuse Public Schools Clinton Twp. L'anse Creuse Public Schools Clinton Twp.

Clio Area School District

Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District

Project Name

Macomb Academy (PSA) Lutz School for Work Experience

Project Description

Start Date

Macomb Academy, remove and replace existing craked and unlevel concrete and asphalt paving and parking areas at entrys and around building to provide proper accessable barrier free entries and safe approaches. Repair/rebuild parking lot.

Clintondale Middle Re-roof Middle School/40% of roof is wet installation and needs to be replaced. LCPS Tenniswood Elementary Media Center AHU Replacement Remove & replace outdated, inefficient AHU LCPS Pankow Glycol System Feeder Installation Add glycol system feeder to enhance operations

Clio

Expected Completion Date

6/1/2009

9/1/2009 8/9/2009

6/20/2009

8/20/2009

6/1/2009

9/1/2009

$ $

90,000 250,000

$

400,000

$

30,000

$

50,000

12/1/2009

$

420,000

O R

6/1/2009

P P A

Funding Request

9/1/2009

D VE

LCPS Pankow Science Labs

Construction of new science labs in existing space at Frederick V. Pankow Center

4/1/2009

Clio Edgerton Elementary School

Construction of a multipurpose room to improve education for elementary students. PE classes would be held in the facility which would permit the cafeteria to be used solely for that purpose. Improved scheduling and use of personnel resources.

8/30/2009

6/30/2010

$

975,000

8/30/2009

6/30/2010

$

975,000

8/30/2009

12/1/2009

$

975,000

T O

Clio

Clio Garner Elementary School

Clio

Clio Lacure Elementary School

Construction of a multipurpose room to improve education for elementary students. PE classes would be held in the facility which would permit the cafeteria to be used solely for that purpose. Improved scheduling and use of personnel resources. Installation of a 12" water line from Dixie Highway to Lacure elementary. The line provide city water to the school and eliminate the current well.

Clio

Clio Community Education Building

Replacement of motors with variable drive motors.

6/15/2009

8/15/2009

$

5,000

Clio

Clio Edgerton Elementary School

Replacement of motors with variable drive motors.

6/15/2009

8/15/2009

$

15,000

Clio

Clio Garner Elementary School

Replacement of motors with variable drive motors.

6/15/2009

8/15/2009

$

15,000

Clio

Clio Lacure Elementary School

Replacement of motors with variable drive motors.

6/15/2009

8/15/2009

$

15,000

Clio

Clio, Carter MS

Replacement of motors with variable drive motors.

6/15/2009

8/15/2009

$

15,000

Clio

Clio High School

Replacement of motors with variable drive motors.

6/15/2009

8/15/2009

$

20,000

Clio

Clio, Carter MS

Replacement of inefficient lighting in gymnasium

6/15/2009

6/30/2009

$

25,000

Clio

Clio High School

Replacement of inefficient lighting in gymnasium

6/15/2009

6/30/2009

$

35,000

Clio

Clio Edgerton Elementary School

Replacement of inefficient and leaking roofs

6/15/2009

8/30/2009

$

100,000

Clio Garner Elementary School

Replacement of inefficient and leaking roofs

6/15/2009

8/30/2009

$

100,000

Clio Lacure Elementary School

Replacement of inefficient and leaking roofs

6/15/2009

8/30/2009

$

100,000

Clio Community Education Building

Replacement of boilers (over 30 years old)

6/15/2009

10/1/2009

$

125,000

Clio Edgerton Elementary School

Replacement of boilers (over 30 years old)

6/15/2009

10/1/2009

$

125,000

Clio

Clio Garner Elementary School

Replacement of boilers (over 30 years old)

6/15/2009

10/1/2009

$

125,000

Clio

Clio High School

Replacement of boilers (over 30 years old)

6/15/2009

10/1/2009

$

125,000

Clio

Clio Lacure Elementary School

Replacement of boilers (over 30 years old)

6/15/2009

10/1/2009

$

125,000

tt i m

ub

Clio Clio Clio Clio

02262009

d e t

S

s t s

-N

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

690 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Clio Area School District Clio Clio Area School District Clio Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District Clio Area School District

Location City or Township

Project Name

Project Description

Clio, Carter MS

Replacement of boilers (over 30 years old) 6/15/2009 Renovation of swimming pool for improved energy savings and the ability to conduct meets on site. 7/30/2009

Clio High School

Funding Request

10/1/2009

$

125,000

10/30/2009

$

175,000

$

250,000

$

250,000

$

300,000

9/30/2009

$

500,000

6/15/2009

9/30/2009

$

750,000

6/15/2009

9/30/2009

$

1,000,000

6/15/2009

9/30/2009

$

1,000,000

6/15/2009

9/30/2009

$

1,000,000

6/15/2009

9/30/2009

$

1,000,000

6/30/2009

8/15/2009

$

1,250,000

D VE

Clio

Clio, Carter MS

Clio

Clio, Carter MS

Installation of larger diesel and regular fuel tanks to accommodate cooperative purchasing and use of fuel with Thetford Township, City of Clio, Vienna Township and Clio Schools. 7/30/2009 Parking Lot Expansion to accommodate addditional busses and improve efficiency with the GISD (Genesee Intermediate School District). 6/30/2009

Clio

Clio Community Education Building

Replacement of inefficient and leaking roofs

Clio

Clio Community Education Building

Replacement of energy inefficient windows

Clio

Clio, Carter MS

Replacement of energy inefficient windows

Clio

Clio Edgerton Elementary School

Replacement of energy inefficient windows

Clio

Clio Garner Elementary School

Replacement of energy inefficient windows

Clio

Clio High School

Replacement of energy inefficient windows

Clio

Clio Lacure Elementary School

Replacement of energy inefficient windows

Clio

Clio, Carter MS

Replacement of inefficient and leaking roofs

Clio

Clio High School

Replacement of inefficient and leaking roofs

6/15/2009

8/30/2009

$

1,750,000

Clio

Clio, Carter MS

Construction of a Salt Barn to share resources and cooperative purchasing with Thetford Township, Vienna Township, Clio Schools and the City of Clio.

6/30/2009

9/30/2009

$

50,000

Clio

Clio, Carter MS

Loading dock repair to facilitate access and improve safety

6/15/2009

9/30/2009

$

50,000

Clio

Clio, Carter MS

6/30/2009

9/30/2009

$

500,000

12/1/2009

$

4,250,000

eq

Clio

02262009

T O

-N

R d

Genesee Intermediate School District Ligon Outdoor Center

Ligon Outdoor Center is owned and operated by Genesee Intermediate School District. This educational resource includes 268 acres of pristine wilderness that offers the ideal location for instructional programming focused on the natural and environmental sciences. It is also available to all 21 of Genesee County’s constituent school districts for professional development, leadership retreats, and other events. Master Plans have been created to expand conference facilities to meet the growing demand of local school districts for educational programming for students at all grade levels. These plans include energy efficiency upgrades and physical plant expansions. Maintenance of several educational buildings, including the Lodge, Stone House, and Log Cabin will ensure Ligon's long-term utility and structural integrity. Addition of a pavilion, well, and small demonstration area will enhance and expand the urban gardening program offered to students from across Genesee County. Due to the ongoing expansion of scientific experimentation for students, several components of the pedestrian infrastructure are in desparate need of repair including observation d6/1/2009

Submitted Requests - Not Approved

9/30/2009

O R

P P A 6/15/2009

Redesign and replacement of south parking lot to improve safety for students. Improve handicapped access for GISD students who attend middle school.

t i m

b u S

s t s

9/30/2009

6/15/2009

e u

e t t

Genesee ISD

Start Date

Expected Completion Date

8/30/2009

Route (Infrastructure Only)

691 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Genesee ISD Comstock Public Schools

Clio, Michigan

Comstock Township

Project Name

Project Description

Start Date

Ligon Outdoor Center

12/1/2009

$

4,250,000

Comstock Public Schools - Comstock High School and Northeast Elementary

Replacement of windows and doors in our high school and middle school. This would allow the district to reduce energy consumption in these two buildings by installing energy efficient windows and doors. 6/1/2009

9/1/2009

$

700,000

9/1/2009

$

5,000,000

9/1/2009

$

5,000,000

10/20/2009

$

115,000

10/1/2009

$

275,000

6/1/2009

10/20/2009

$

275,000

The Concord High School Football Field is 50 years old and is in need of new drainage, irrigation, lighting and crown. The track has been patched several times and has irreparable cracks in the base. Both need to be completely renovated. The district can not at this time afford to put money into a deteriorating athletic complex when it has more pressing instructional needs. 6/1/2009

10/15/2009

$

2,000,000

T O

Comstock Township

Comstock Public Schools - ACLC

Comstock Public Schools

Comstock Township

Comstock Public Schools

Replace energy inefficient chillers and condensors at all buildings. Install new high efficiency air conditioning equipment at buildings that currently have air condition.

Concord

Concord Community School District Replace Doors and door openings at the high school

The doors and door frames at the high school are original to the building and are in dire need of replacement. Replacing these units would close up many areas where air is infiltrating into the building. The estimated savings would be approximately 35% in comparison to the existing units. 6/'1/2009

Concord

The windows and window openings at the elementary/middle school are approximatel 28 years old and were constructed of wood. Even though we have preformed annual preventative maintenance the window frames and sashes are deteriorating to the extent that air infiltration and moisture leakage are a constant problem. This project would replace all existing windows replacing them with high energy efficient units that would be approximately 40% larger while being 30% more energy efficient than the Concord Community School District Replace existing units. Consequently the amount of ambient light in each room would increase and insulate windows and window openings at allowing for less energy to be needed to provide sufficient lighting in the classroom. In elementary middle school addition all window frame openings would be insulated to reduce air infiltration. 6/1/2009

Concord Community Schools

Concord Community Schools

Concord

Concord

02262009

d e tt

q e R

N s

st

e u

6/1/2009

t i m

S

ub

The windows and openings in the high school are original to the buildings and have Concord Community School District Replace been in place for over forty-five years. This project would replace the windows with and insulate windows and window openings at energy efficient units that would cut our fuel consumption by approximately 30% in the high school comparison to the existing units and insulate the adjoining openings.

Concord Community School District Athletic Complex Renovations

Submitted Requests - Not Approved

O R

P P A

Comstock Public Schools

Concord Community Schools

Funding Request

Ligon Outdoor Center is owned and operated by Genesee Intermediate School District. This educational resource includes 268 acres of pristine wilderness that offers the ideal location for instructional programming focused on the natural and environmental sciences. It is also available to all 21 of Genesee County’s constituent school districts for professional development, leadership retreats, and other events. Master Plans have been created to expand conference facilities to meet the growing demand of local school districts for educational programming for students at all grade levels. These plans include energy efficiency upgrades and physical plant expansions. Maintenance of several educational buildings, including the Lodge, Stone House, and Log Cabin will ensure Ligon's long-term utility and structural integrity. Addition of a pavilion, well, and small demonstration area will enhance and expand the urban gardening program offered to students from across Genesee County. Due to the ongoing expansion of scientific experimentation for students, several components of the pedestrian infrastructure are in desparate need of repair including observation d6/1/2009

Demolition of a dormant school building. The district would demolish the school building and restore the site to a green space. The area around the dormant school building is in a low income neighborhood situated in a impoverished community. This project would offer the community an opportunity to improve a blighted area and improve the immediate enviroment. 5/1/2009

Concord Community Schools

Expected Completion Date

Route (Infrastructure Only)

D VE

692 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Concord Community Schools

Project Name

Project Description

Start Date

Concord Community School District Replace and insulate Roofs all District Buildings

Over the past two years we have been working with a roofing contractor and have received information that our roofs need to be replaced. This is a job that is not within the financial means of the District. All existing roofs would be replaced or resealed and brought up to maintainable standards. Insulation would be added to all roofs to decrease district energy consumption. 6/1/2009

Concord

Concord Community School District Boiler Replacement Administrative Building

The Concord Community Community Schools are currently running a one boiler system that is now 50 years old and needs to be replaced. The district would like to invest in a new system that uses two boilers and decreases the amount of fuel needed significantly. 6/1/2009

Cooks

Exterior door replacement

Concord

Expected Completion Date

10/1/2009

Funding Request

D VE $

4,750,000

$

75,000

August, 2009

$

150,000

June, 2009

$

22,000

June, 2009

July, 2009

$

350,000

O R

Concord Community Schools Big Bay De Noc School District Big Bay De Noc School District Big Bay De Noc School District

Cooks

Telephone project

Cooks

Paving project

Replace all exterior doors(35 years old) with new energy efficient doors Replace out-dated telephone system with new system that would provide safety features like caller ID Repaving some previously paved areas,changing traffic patterns, enlarging some parking areas and paving several new areas

Big Bay De Noc School District

Cooks

Computer Upgrade Project

Upgrade dated computer workstation and server to state of the art technology in order to utilize current application available for student education

June, 2009

June, 2009

$

65,000

Forest ParkFiber build to Merit Network

Splice into Merit's fiber backbone in Crystal Falls to improve added reliability and connectivity which would allow our students to have greater learning opportunities sharing services with the local Intermediate school district.

9/1/2009

8/1/2010

$

10,320

6/8/2009

9/1/2009

$

383,425

Forest Park School District Forest Park School District Forest Park School District Forest Park School District Forest Park School District

Forest Park School District Forest Park School District Carson City-Crystal Area Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools

Crystal Falls

June, 2009

A T

s

O N

PP

June, 2009

9/20/2009

Crystal Falls

Forest Park Energy Efficiency

Crystal Falls

Forest Park Safety

Remodel 4 high school bathrooms and 2 locker rooms which are 36 years old with green product tiling and low flow sensor faucets, dual flush toilets, water saving showering facilities and stall partition replacement. Remove unsafe floor tile in front entrance with green products that reduce life cycle costs of labor and chemical applications

6/8/2009

8/1/2009

$

25,379

Crystal Falls

Forest Park Safety

Remove and replace 4000 square feet of high school and library 36 year old carpeting with green products that reduce the life cycle cost of labor and chemical applications 6/8/2009

9/1/2009

$

33,300

Remove and replace 33 exterior doors with energy efficient doors and thermal, broken, aluminum doors and frames and access controls with a barrier free door acesss including a keyless security system.

8/1/2009

$

34,750

$

775,000

Crystal Falls

Forest Park Energy Efficiency

d e tt

e u

st

q e R

remodeling, equipping, and re-equipping school buildings, and preparing, developing and improving sites at school buildings; and erecting, remodeling, equipping and reequipping athletic facilities and playgrounds, and preparing developing and improving sites for athletic facilities and playgrounds.

Crystal Falls

Forest Park School District

Crystal Falls

Forest Park Aesthetics Paint the 36 year old lockers in the high school Carson City-Crystal Area Schools, Crystal Elementary Run fiber from elementary to connection completing a broad band circuit Davison Community Schools - Hill Elementary School Boiler replacement Davison Community Schools - Thomson Elementary Boiler replacement Davison Community Schools - Davison Middle School Boiler replacement Davison Community Schools - Central Elementary School Boiler replacement Davison Community Schools - Central Elementary School Roof replacement Davison Community Schools - Hill Elementary School Parking Lot Expansion and related Drainage

Davison Davison Davison Davison Davison Davison

02262009

it

m b u

Crystal Township

S

4/1/2009

Submitted Requests - Not Approved

6/8/2009

9/1/2009

$

20,000

May, 2009

July, 2009

$

40,000

None Set

None Set

$

252,000

None Set

None Set

$

252,000

None Set

None Set

$

287,500

None Set

None Set

$

355,000

None Set

None Set

$

533,000

None Set

None Set

$

227,500

Route (Infrastructure Only)

693 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools Davison Community Schools

Location City or Township Davison Davison Township Davison Township Davison Township

Davison Township

Project Name Project Description Davison Community Schools - Davison Middle School Gymnasium flooring replacement Davison Community Schools - Gates Elementary School Boiler replacement Davison Community Schools - Davison Alternative Education Boiler replacement Davison Community Schools - Davison High School Boiler replacement

Start Date

Dearborn Heights

Funding Request

None Set

None Set

$

244,000

None Set

None Set

$

237,500

None Set

None Set

$

282,000

None Set

None Set

$

772,000

$

1,445,000

$

500,000

$ $

1,880,000 2,000,000

Davison Community Schools - Davison Alternative Education

Classroom renovations including lighting, HVAC, offices, windows, doors, flooring, lighting, ceilings, and general reconfiguration. Project includes related electrical and low voltage wiring infrastructure installation. 6/15/2009

Star International Academy

The project is a $500,000 renovation to enhance the learning environment of the school. The renovations include installing a computer-controlled HVAC climate system that has a 90 percent efficiency rating, It also includes motion and heatdeteting sensors in each classroom to reduce energy use, and an electronicallycontrolled Carbon Dioxide Omission Sensor Vent System. Many internal repairs will also be made as the building is brought up to local building code standards. An additional maintenance and supply storage addition will also be constructed. The student body is Title I eligible and about 90 percent of current enrollees receive free or reduced lunches. More than 80 percent of the student body have persons at home that are not native Engllish speakers. Numerous construction jobs will be added by trades contractor firms that handle the work. Energy savings will lead to more funds available for student academic programs. 4/1/2009

T O

Star International Academy

Expected Completion Date

O R 8/28/2009

D VE

Route (Infrastructure Only)

P P A

N s

t s e

The project is a $500,000 renovation to enhance the learning environment of the school. The renovations include installing a computer-controlled HVAC climate system that has a 90 percent efficiency rating, It also includes motion and heatdetecting sensors in each classroom to reduce energy useage, and an electronicallycontrolled Carbon Dioxide Omission Sensor Vent System. Many internal repairs will also be made as the building is brought up to local building code standards. A maintenance and supply storage addition will also be constructed. The student body is Title I eligible and about 90 percent of current enrollees receive free or reduced lunches. More than 75 percent of the student body have persons at home that are not native Engllish speakers. Numerous construction jobs will be added by trade contractor firms that handle the work. Energy savings will lead to more funds available for student academic programs. May, 2009

9/1/2009

u q e

Universal Learning Academy

Dearborn heights

e t t

R d

Universal Learning Academy

t i m

Deckerville Community Schools is in need of many facility modernizations, renovations, and repairs.The following are the district's needs. 1. Technology update/replace hubs/switches of the existing nextwork infrustructure - purchase of equipment and installation of classroom instructional tools - upgrade alarm systems, bells and clock systems - purchased and install wireless remote connections for all nonattached buildings 2. make current bus garage energy efficient for winter weather and update bus fleet to utilize renewable energy sources 3. construction of a multipurpose room to accomidate preforming arts, physical education, and lunchroom 4. repair and upgrade existing parking lots 5. increase the size of 4 small classrooms that were built in the 1950's 6. replace furniture and casework in classrooms 7. demolish existing preforming arts and phyical education facility that was built in the Deckerville Comm Schools Facilities/Building 1920's 8. replace individual classroom heating units with a more efficient system 9. modernize security system 6/1/2009 Modernization, Renovation, and Repair Holt/All Schools Technology Infrastructure Re-Build 6/10/2009

9/1/2009

b u S Deckerville Community School District Deckerville Holt Public Schools Delhi Township

02262009

Submitted Requests - Not Approved

9/1/2010 8/30/2009

694 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township Holt Public Schools Delhi Township

Project Name Holt/Delhi Township Holt/Dimondale Holt/ Horizon Holt/All Schools Holt/High School Holt/All Schools Holt/9th, admin. Holt/Jr. High Holt/Support Services Building

Project Description Colaborative Server Hosting of Township Servers Replace/repair slanting wal Replace moveable wall, 65' x 19' x 3.5" in gym Messaging Systems Replacement Video System Replacement Video Surveillance / Security Install insulated duct work for plenum Roof replacement for 8600sf using reinforced PVC membrane Replace 2 doors, repair foundation

Start Date 6/1/2009 6/9/2009 6/9/2009 6/10/2009 1/3/2009 6/10/2009 6/1/2009 6/9/2009 6/10/2009

Holt Public Schools

Holt/Hope

Resurface playground soil. Remove parking lot remains. Apply soil and seed

6/10/2009

DeTour

DeTour Area Schools

K-12 School Improvement for Technology.Replace outdated computer equipment and upgrades for classroom presentation. With budget cuts there is no money to replace computer equipment that is 5 to 10 years old. Because of our rural location many students take advantage of Michigan Virtual High School on-line courses. The on-line classes are one way we can offer curriculum we are too small to fund. The courses require an up to date computer to be able to connect to the Internet and run the programs. All students in the district are currently being tested using computer equipment and softwate to evaluate their progress and test skills, research is performed, documents are typed, and presentations made. The computer network has become such a large part of our curriculum that we cannot function without the nearly one to one computing. The money would be used to purchase desktop and notebook computers and software for the computer labs, classrooms and library for each of our two schools. Lab printers, servers, projectors/mounts and white board would also be purchased for the two schools.

Detroit

Detroit Community Schools, PSA

Detroit

Detroit Community Schools, PSA

Delhi Township

T O

Detour Area Schools Detroit Community Schools Detroit Community Schools

Detroit Community Schools

Detroit Community Schools Detroit Community Schools

Dexter Community School District

Detroit

Dexter

Kaleva Norman Dickson School District Dickson

02262009

20,000

N s

$

390,300

$

40,000

7/15/2009

$

75,000

Remodel approx 10,000 sq feet of existing high school (bldg code 08456) for use as a multi purpose auditorium. School currently has no auditorium. Facility will be used for whole school assemblies, and performing arts (to include vocal and instrumental music, theatre, and support space). Seating capacity of auditorium would be approx imately 700 people. Electrical capacity would be augmented by the use of a solar photo voltaic elctrical system. 4/15/2009

8/15/2009

$

1,500,000

Detroit Community Schools, PSA

Improve exterior lighting - on grounds as well as parking. Landscape improvements trees, shrubs, gravel and rock gardens. Thorny plantings to enhance security around particular windows or buildings. Exterior security system that is internet protocol ready. Note .... High School (08456) and Elem school (09619) are in separate facilities on a common campus. These exterior improvements would benefit both schools. 4/15/2009

5/15/2009

$

30,000

Detroit Community Schools, PSA

Replace exterior fence and gates to Detroit Community Schools campus.

3/15/2009

$

20,000

Dexter Community School District

Remodeling and constructing additions to school district buildings, including energy conservation and security improvements; acquiring land and improving and developing sites, including playgrounds, playfields and outdoor athletic fields and facilities.

$

47,890,000

Kaleva Norman Dickson, Brethren HS, Brethren MS

Repair/Install Outside Security Lights

$

20,000

t i m

ub

S

$

D VE

7/15/2009

Detroit Community Schools, PSA

Detroit

O R 7/30/2009

Funding Request 10,000 30,000 80,000 100,000 120,000 300,000 40,000 26,500 30,000

Add a solar water heating system to high school (building code 08456). System would be used to heat water for the lockerroom showers, toilets, and shop studios. 4/15/2009 Addition of a a solar photo voltaic renewable electrical system ot provide power and lighting for existing high school (building code 08456). 4/15/2009

d e tt

Detroit

8/30/2009 6/30/2009 8/9/2009 7/30/2009

$ $ $ $ $ $ $ $ $

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

st

e u

Expected Completion Date 7/30/2009 7/9/2009 7/9/2009 7/15/2009

2/15/2009

6/9/2009

8/9/2009

695 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kaleva Norman Dickson School District Dickson Kaleva Norman Dickson School District Dowagiac Union School District Dowagiac Union School District Dryden Community Schools Dryden Community Schools Dryden Community Schools Dryden Community Schools

Durand Area Schools

Durand Area Schools

Durand Area Schools

Durand Area Schools Eaton Rapids Public Schools Eaton Rapids Public Schools Eaton Rapids Public Schools Eaton Rapids Public Schools Eaton Rapids Public Schools

Edwardsburg Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

Kaleva Norman Dickson, Brethren MS

Two Lochinvar Boilers

6/9/2009

8/9/2009

Dickson, Norman, Maple Grove

Kaleva Norman Dickson, Brethren HS, Brethren MS, Wellston EL, Kaleva EL

Smart Boards

6/9/2009

8/9/2009

Dowagiac

Dowagiac

Boiler replacement

ASAP

6 months

Dowagiac

Dowagiac

Parking lot rebuilding

ASAP

Dryden

Dryden Community Schools -Elementary

Replace 3 boilers to become more energy efficient

6/1/2009

Dryden Township

Dryden Community Schools -High School

Arsenic removal system to become compliant with water standards

6/1/2009

Dryden Township

Dryden Community Schools -High School

Upgrade electrical at Lagoon Pump Station

Dryden Township

Dryden Community Schools -High School

Replace 2 boilers to become more energy efficient

Funding Request

$

120,000

D VE $

60,000

$

1,200,000

$

1,100,000

8/31/2008

$

90,000

8/31/2008

$

65,000

5/1/2009

7/31/2009

$

25,000

6/1/2009

8/31/2008

$

60,000

Durand

Durand Area Schools/Durand Administration Building

Complete building entrance and window replacement, HVAC and lighting improvements. Improvements to entrances, windows, HVAC and lighting will improve energy efficiency. Sustainability/green design will be utilized in the project. 6/9/2009

12/10/2009

$

736,720

Durand

Complete building entrance and window replacement, HVAC and lighting improvements. Improvements to entrances, windows, HVAC and lighting will create a Durand Area Schools/Bertha Neal Elementary more productive learning environment as well as improve energy efficiency. School Sustainability/green design will be utilized in the project. 6/9/2009

12/10/2009

$

1,610,825

Durand

Complete building entrance and window replacement, HVAC and lighting improvements. Improvements to entrances, windows, HVAC and lighting will create a Durand Area Schools/Robert Kerr Elementary more productive learning environment as well as improve energy efficiency. School Sustainability/green design will be utilized in the project. 6/9/2009

12/10/2009

$

1,735,160

12/10/2009

$

13,271,905

April 30th, 2009

$

15,000

August 15th, 2009 $

75,000

e u

Eaton Rapids Public Schools

Edwardsburg Public Schools, All Buildings Lighting Replacements

DISTRICT LIGHTING-PROJECT SUMMARY TO UPGRADE CURRENT T-12'S TO ENERGY SAVING T-8'S. THIS WOULD BE ACCOMPLISHED AT THE PRIMARY, ELEM., MS, HS AS THE OTHER FACILITIES ARE NEWER AND TAKE ADVANTAGE OF THE T-8 TYPE UNITS. BREAK DOWN: MATERIALS $41k; LABOR $ 40k. *PAYBACK OF PROJECT 9 MONTHS TO 1.5 YEARS. *PERCENTAGE OF PAYBACK 70%+ . *COST OF DELAY IN ENERGY TO EPS DISTRICT 2,400 DOLLARS PER MONTH OR 26k PER YEAR.

d e t

Durand Area Schools/High School

Eaton Rapids

Eaton Rapids Public Schools

Eaton Rapids

Eaton Rapids Public Schools

Eaton Rapids

S

Eaton Rapids

Edwardsburg

itt

m b u

Eaton Rapids

q e R

O N

New multi-media auditorium, complete building window replacement, and minor HVAC improvements. New auditorium will provide a 21st century learning environment. Window replacement and HVAC improvements will provide a more desirable learning environment and improve energy efficiency. New technology and technology infrastructure will be included. Sustainability/green design will be utilized in the project.6/9/2009 The replacing of a Roof Membrane at a Elementary School to help the School District with it's energy efficiency. April 1st, 2009 The Installing of Heating and Cooling control systems to help the School District with it's energy efficiency. April 1st, 2009 The replacing of boilers at the High School to help the School District with it's energy efficiency. April 1st, 2009 The renovation of the school libraries to ensure that students have access to up to date educational technology. April 1st, 2009 The Installing of Security Camera's to help ensure the Health and Safety of Eaton Rapids Public Schools Students and Staff. April 1st, 2009

Durand

02262009

st

s

A T

PP

Eaton Rapids Public Schools

Eaton Rapids Public Schools

Submitted Requests - Not Approved

O R

7/1/2009

6 months

April 30th, 2009

$

150,000

August 15th, 2009 $

200,000

August 15th, 2009 $

70,000

8/1/2009

81,000

$

Route (Infrastructure Only)

696 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Edwardsburg Public Schools

Edwardsburg Public Schools

Elk Rapids Schools

Elk Rapids Schools

Project Name

Project Description

Start Date

Edwardsburg Public Schools, Eagle Lake Elementary Main Boiler Replacement

EAGLE LAKE-BOLIER-CURRENT HEATING SYSTEM FOR ORIGINAL BLDG. IS WELL OVER 50-60 YRS. OLD. OPERATING AT 50+% EFFICIENCY. CONVERT OUR CURRENT WATER STEAM UNIT TO HOT WATER WHICH WILL OPERATE AT 90% WHICH WILL BE MORE ENERGY EFFICIENT AND SAVE FUEL COSTS. THIS BOILER HEATS APPROXIMATELY 70% OF OUR BUILDING. PROJECTED COST OF THIS PROJECT IS IN THE RANGE OF $300K-$370K. 6/1/2009

Edwardsburg

Edwardsburg Public Schools, High School Boiler Replacements

HIGH SCHOOL-BOILERS-CURRENT HEATING SYSTEM FOR THIS FACILITY INSTALLED APPROX. 1961 OR 48 YRS. OLD. IT'S EFFICIENCY RATING IS APPROXIMATELY 50%. 2-4 NEW HOT WATER UNITS INSTALLED IN THE HS'S LOWER LEVEL WOULD RAISE ENERGY EFFICIENCY. 07-08 HEATING COST FOR THE HIGH SCHOOL WAS APPROXIMATELY $87K. NEW UNITS WOULD OPERATE AT 90% . THE DELIVERY SYSTEM WOULD BE INSPECTED AND UPDATED IF WARRANTED. 7/1/2009

Elk Rapids

The project includes "recommissioning" existing HVAC systems at each of our 4 main buildings. This was calculated by engineers who performed a "Limited Component Elk Rapids Schools - Elk Rapids High School, Technical Energy Analysis (LCTEA)" to have a 3 to 4-year payback in terms of energy Cherryland Middle School, Lakeland savings. Their LCTEA Report was completed in January of 2008 and resulted from Elementary and Mill Creek Elementary participation in the "Rebuild Michigan" Program. 4/1/2009

Elk Rapids

This project includes installation of variable frequency drives (VFD's) within 3 of our 4 main buildings. The pricing for these energy efficiency measures is derived from formal bidding that occurred on 12/1/08. A $275,000 contract was awarded to implement an energy management system along with other energy retrofit measures. Elk Rapids Schools - Elk Rapids High School, That project is underway and will conclude by 4/1/09. The VFD's were removed from Cherryland Middle School and Lakeland the project scope after bidding results were analyzed and it was determined that the Elementary project budget could not include them. 4/1/2009

Edwardsburg

Expected Completion Date

D VE $

370,000

9/1/2009

$

650,000

5/31/2009

$

20,000

5/31/2009

$

36,000

Elk Rapids

This project entails acquiring at least one diesel-electric hybrid school bus. The district currently has funding set aside to purchase 3 new school buses in the coming months The expectation is to award a bid by late May 2009 and initiate the purchase order by 6/1/09. We are interested in at least 1 hybrid among the 3 to be purchased, if grant funding is available to assist. The bus vendor has explained that hybrids cost approximately twice that of a conventional diesel-powered bus. This means a price of around $150,000 for the hybrid versus $75,000 for a conventional bus. We have bond Elk Rapids Schools - Elk Rapids High School, funding set aside for the $75,000 but are quite interested in getting a hybrid if the additional $75,000 is granted. The diesel-electric hybrid would replace a 17 year-old Cherryland Middle School, Lakeland conventional diesel bus. 6/1/2009 Elementary and Mill Creek Elementary

7/31/2009

$

150,000

Elk Rapids

This project includes "pneumatic to direct digital control (DDC)" conversions specifically for the cabinet and radiant heating at all 4 buildings. The pricing for these energy efficiency measures is derived from formal bidding that occurred on 12/1/08. A $275,000 contract was awarded to implement an energy management system along with other energy retrofit measures. That project is underway and will conclude by Elk Rapids Schools - Elk Rapids High School, 4/1/09. The DDC conversions were bid out as an "add alternate" to see how pricing Cherryland Middle School, Lakeland would look. They were removed from the project scope after bidding results were Elementary and Mill Creek Elementary analyzed and it was determined that the project budget could not include them. 4/1/2009

5/31/2009

$

158,000

A T

s

t s e

8/1/2009

Funding Request

PP

O R

O N

Route (Infrastructure Only)

u q e

Elk Rapids Schools

Elk Rapids Schools

02262009

R d

e t tt

b u S

i m

Submitted Requests - Not Approved

697 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Elk Rapids Schools

Elk Rapids

Elk Rapids High School

This project includes paving an unimproved section of a parking lot (approximately 136,000 square feet) adjacent to our high school. Presently, our student drivers greatly outnumber the available parking spaces. This causes overflow parking into a gravel and dirt section. In the spring and fall this area is riddled with potholes. Pricing for this project is based upon recent quotes from local paving companies. 5/1/2009

Ellsworth Community School

Ellsworth, Banks Township

Ellsworth Community School

Upgrade the technology in the two buildings to be more efficient and accessible to the community. This will include new wiring and new technologies. 6/1/2009

Ellsworth Community School

Upgrade the two buildings to be more energy efficient. This will include new wiring, new insulation, addition of an enclosed breezeway, new windows, new lighting, new heating and ventilation system.

Ovid-Elsie Area Schools

Ovid-Elsie Area Schools uses a wide variety of appliances throughout the district as part of its curriculum delivery system and student support services. None of the current appliances used in our schools are ENERGY STAR qualified. Our goal is to reduce our energy costs and water usage by replacing and recycling all of our outdated appliances. Research shows that ENERGY STAR qualified appliances use at least 20% and up to 40% less energy than the conventional models we currently own. We wish to model and promote environmental stewardship to all of our Immediately upon students, parents and community by improving energy efficiency and water notification of conservation in all of our buildings. grant 30 Days

Energy Neutral Greenhouse Ovid-Elsie Area Schools

Ovid-Elsie Area Schools is a rural school district with an active agricultural economy. As part of our science curriculum and our large FFA program, we would like to construct an energy-neutral greenhouse. It would be powered by solar energy, wind power, and heated by a biomass burner. This would be a real, hands-on laboratory that teachers will use to prepare students for the many careers related to horticulture and the plant sciences fields. Horticulture science is considered one of the fastest growing segments of the agriculture industry along with plant biotechnology and genetic engineering. By powering and heating the greenhouse with wind power, solar 60 days of energy, and a biomass burner, we will model to our students the concepts of notification of environmental stewardship and usage of clean energy. grant

Ellsworth Community School

Ovid-Elsie Area Schools

Ovid-Elsie Area Schools

Ellsworth, Banks Township

Elsie

Elsie

T O

d e t

s t s

6/1/2009

5/31/2009

Dec. 2009

D VE $

300,000

$

50,000

$

100,000

$

35,250

6/1/2009

$

110,000

O R

P P A

Funding Request

Dec. 2009

-N

e u

q e R

Ovid-Elsie Area Schools is a rural, agricultural based school district located in central Michigan that is dedicated to providing its students with a world-class educational experience. A large part of that education is teaching our students the importance of environmental stewardship and energy conservation. Our goal is to utilize a combination of wind power and solar energy to help reduce operational costs, lower our carbon footprint and provide our teachers and students a real life energy-related teaching tool and curriculum. By installing two wind turbines and solar panels, we estimate that we can reduce our energy costs by 15% and then reinvest these savings directly to academic needs. Additionally, we will model for our students and 60 days after Wind and Solar Power Energy Ovid-Elsie Area community the importance of energy conservation and provide leadership in notification of supporting an environmentally sustainable energy economy. grant Schools Replace lighting fixtures and ballasts in Career Technical building with energy efficient Delta-Schoolcraft ISD type 6/1/2009

5/30/2009

$

285,000

8/15/2009

$

28,000

Delta-Schoolcraft ISD Escanaba

Delta-Schoolcraft ISD

5/31/2009

$

39,500

Delta-Schoolcraft ISD Escanaba

Delta-Schoolcraft ISD

9/15/2009

$

400,000

Delta-Schoolcraft ISD Escanaba

Delta-Schoolcraft ISD

8/15/2009

$

34,000

Ovid-Elsie Area Schools

tt i m

Elsie

Delta-Schoolcraft ISD Escanaba

02262009

Route (Infrastructure Only)

b u S

Replace non energy efficient boiler system with 4 Weil Mclain energy efficient boilers 4/1/2009 Upgrade technology infrastructure by adding redundancy ensuring up-to-date technology to all 7 local districts, that are part of our network. 7/1/2009 Repair existing parking lot and add extra section of 20 parking spaces including modifications necessary for ADA and section 504 6/1/2009

Submitted Requests - Not Approved

698 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Clarenceville School District Fenton Area Public Schools

Fenton Area Public Schools Fenton Area Public Schools Fenton Area Public Schools Kearsley Community Schools

Location City or Township

Project Name

Essexville

Essexville-hampton- Garber High School

Essexville

Essexville-hampton- Garber High School

Essexville

Project Description Replace old doors at various locations throughout the building with new energy efficient doors which will also improve building security. Construct a new main entrance to Garber High School in place of the existing entrance that is more safe, energy efficient, and functional.

Funding Request

6/15/2009

8/15/2009

$

83,000

6/15/2009

8/15/2009

$

100,000

Essexville-hampton cramer junior high school Replace old classroom lights with new energy efficient lighting systems.

6/15/2009

8/15/2009

$

100,000

Essexville

Essexville-hampton- Garber High School

6/15/2009

8/15/2009

$

150,000

Essexville

Essexville-hampton cramer junior high school Replace existing boiler units and one heating unit with new energy efficient units.

6/15/2009

$

170,000

Essexville

Essexville-hampton cramer junior high school Replace current rooftop air conditioning units with new energy efficient units.

6/15/2009

8/15/2009

$

200,000

Essexville

Essexville-hampton- Garber High School

Replace current chiller units with new energy efficient units.

6/15/2009

8/15/2009

$

240,000

Essexville

Essexville-Hampton Hughes Elementary

Replace existing windows with new energy efficient windows.

6/15/2009

8/15/2009

$

10,000

Essexville

Essexville-hampton Hughes Elementary

Replace existing boiler units with new energy efficient boilers.

6/15/2009

8/15/2009

$

85,000

Essexville

Essexville hampton-Hughes Elementary

8/15/2009

$

85,000

Essexville

Essexville-hampton-Brick Work

8/15/2009

$

75,000

Essexville

Essexville - Hampton

Replace the roof on the south wing of the building. 6/15/2009 Conduct tuck point work on existing brick structure to prevent leaks and improve structure. 6/15/2009 Upgrade the quality and number of computers available in classrooms throughout the district for student use. 6/15/2009

8/15/2009

$

160,000

Essexville

Essexville-hampton- Garber High School Clarenceville School District - Transportation Garage Fenton Area Public Schools-High School building

6/15/2009

8/15/2009

$

530,000

4/15/2009

30 days after start

$

70,000

6/9/2009

9/1/2009

$

220,000

Farmington Hills Fenton

Fenton Area Public Schools-High School Chemistry and Foods Labs Fenton Area Public Schools-Preschool/K building renovation

Fenton Fenton

d e t

Replace one of the rooftop air handling units to improve efficiency and airflow.

s

st

A T

e u

Replacement of 40 year+ roof

Complete a pipe replacement project at the high school building.

9/1/2009

$

360,000

9/1/2009

$

500,000

6/9/2009

9/1/2009

$

2,000,000

April, 2009

Septembet, 2010

$

2,000,000

8/30/2010

$

3,500,000

Fenton

FentonArea Public Schools-Preschool/K building renovation

Flint

Kearsley community Schools

Heating/Ventilation/Air Conditioning Renovations

S Flint

02262009

Genesee Intermediate School District Elmer A. Knopf Learning Center

8/15/2009

D VE

Create additional Chemistry classroom and lab space to accommodate the new high school graduation requirements. Create a foods lab at the high school to provide an opportunity for all students to meet new technology standards in a hands on environment. 6/9/2009 Renovate 10 small classrooms in an existing building to accommodate the transition of 5 developmental kindergarten classes into all-day programs. 6/9/2009 Overhaul the existing HVAC system in an existing building to accommodate the development of a preschool through K program inclusive of all day developmental kindergarten and all day kindergarten programs.

tt i m

O R

PP

O N

Replace the roof on the north side of the building.

q e R

ub

Genesee ISD

Start Date

Expected Completion Date

The Elmer A. Knopf Learning Center is owned and operated by the Genesee Intermediate School District. Serving 250 special education students from across Genesee County, this facility offers educational and recreational programming for students with disabilities ranging from moderately cognitively impaired to autism spectrum disorder. Ages of students range from 5 to 26 years. This facility was built as an elementary school. The numbers, sizes and configurations of classrooms and bathroom facilities is inadequate to meet the needs of this growing population. Plans are being developed to reconfigure the existing space to better meet the needs of students, as well as to upgrade energy efficiency and building security. These upgrades will create a more flexible learning environment for students, many of whom stay in our programs for their entire school careers. 6/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

699 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Carman-Ainsworth Community Schools

Carman-Ainsworth Community Schools

Carman-Ainsworth Community Schools

Carman-Ainsworth Community Schools Carman-Ainsworth Community Schools

Project Name

Project Description

Start Date

Flint Township

Carman-Ainsworth Community Schools-All Buildings

Energy conservation improvements to ten instructional buildings and three ancillary buildings with a goal to reduce energy consumption and operating costs, provide a healthy, safe, comfortable learning environment, and provide financial solutions with guaranteed results. The project will include boiler replacements, lighting retrofits, occupancy sensors, water retrofits, expansion of the current energy management system, building envelope, energy audits and training.

Flint Township

Carman-Ainsworth Community SchoolsWoodland Elementary, Dye Elementary, Stalker (adult ed), Administration Building and Service Center

Roof replacement at three instructional buildings, the administration building and service center (maintenance building) is a high priority due to the fact that with a lack of funding over the years has left some of our roofs in need of immediate attention. Roofs will be either single ply or a built up roof to match existing roofs. 6/1/2009

Carman-Ainsworth Community SchoolsCarman-Ainsworth Administration Building

Excavation and repair of administration building to prevent continued water damage. Dig out south wall of building, set drain tile and water proof wall, backfill wall with pea rock and slope grade away from building with lime stone rock to prevent water leaks in lower level in business office and technology areas. 4/1/2009

Carman-Ainsworth Community SchoolsCarman-Ainsworth High School Carman-Ainsworth Community Schools-All Buildings

With an increasing special education student population at our high school, we are in need of additional classrooms. With an additional two to three classrooms, students would benefit with lower class size and up-to-date facilities and technology. 6/1/2009 Paving at various instructional and ancillary buildings is needed. Additional parking space is also needed. 6/1/2009

Flint Township

Flint Township Flint Township

T O

s t s

Expected Completion Date

6/1/2009

5/31/2010

-N

Genesee Early College (GEC) is an intensive, state-of-the-art, five-year high school combining the best elements of the high school and early university experiences. It is designed to prepare underserved students for careers and advanced study in the medical and health professions. The school is operated by the Genesee Intermediate School District and is a fully integrated part of the University of Michigan-Flint community. Students begin dual enrolling in grade 10 and experience relevant and hands-on experiences related to the health-care professions. Students may also earn up to sixty (60) college credits at no cost to their family. GEC serves students in Genesee County and accepts students from neighboring counties as well. Students are identified for this program based on student/family interest, counselor and teacher recommendation, demonstrated academic path, as well as being identified as underserved academically, socially, and/or economically. A one-week summer orientation is required for new students to prepare them for college-level work and to introduce them to the University’s campus, faculty, and resources. Students attend s9/7/2009

D VE $

4,477,573

9/30/2010

$

1,040,000

6/1/2009

$

25,000

8/31/2009

$

275,000

8/31/2009

$

1,000,000

Ongoing

$

969,036

8/30/2010

$

3,500,000

8/1/2009

$

200,000

O R

P P A

Funding Request

Route (Infrastructure Only)

e u

Genesee ISD

Flint

d e tt

Genesee Early College

t i m

b u S Genesee ISD Flint Fowlerville Community Schools Fowlerville

02262009

Elmer A. Knopf Learning Center Fowlerville Kreeger Elementary-07706

q e R

The Elmer A. Knopf Learning Center is owned and operated by the Genesee Intermediate School District. Serving 250 special education students from across Genesee County, this facility offers educational and recreational programming for students with disabilities ranging from moderately cognitively impaired to autism spectrum disorder. Ages of students range from 5 to 26 years. This facility was built as an elementary school. The numbers, sizes and configurations of classrooms and bathroom facilities is inadequate to meet the needs of this growing population. Plans are being developed to reconfigure the existing space to better meet the needs of students, as well as to upgrade energy efficiency and building security. These upgrades will create a more flexible learning environment for students, many of whom stay in our programs for their entire school careers. 6/1/2009 Replace boilers and install with new boilers 92-94% energy efficient. Estimated savings in natural gas usage is 15-20%. 5/1/2009

Submitted Requests - Not Approved

700 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Fowlerville Community Schools Fowlerville

Project Name Fowlerville Kreeger Elementary-07706

Fowlerville Community Schools Fowlerville Frankfort-Elberta Area Schools Frankfort

Fowlerville Smith Elementary-01285 Frankfort-Elberta Area Schools, Fraser Public Schools/ Operations and Maintenance

Fraser Public Schools Fraser Fraser Public Schools Fraser

Project Description Replace worn shingle roof (approximately 1060 squares) with new shingles and flashing. Current roof leaks and shingles are porous.

Start Date

Expected Completion Date

6/1/2009

8/1/2009

The project would replace single pane aluminum windows with modern insulated windows plus replacing all the doors. The current windows and doors are original to 1974. 6/1/2009 We currently have 6 projects that are "shovel ready" and could be initiated within 120 days if not sooner. The projects are as follows:

9/1/2009

Build a new Salt Storage shed to comply with the Federal Watershed Act.

9/1/2009

Funding Request $

385,000

D VE $

160,000

$

60,000

$

25,000

9/1/2009

$

60,000

6/12/2009

9/1/2009

$

90,000

6/12/2009

O R

Fraser Public Schools Fraser

Fraser Public Schools/Fraser High School Exterior Lighting at Fraser high school replaced with current efficient lighting Fraser Public Schools/Eisenhower Elementary School Needed storage 250 sq ft for supplies

Fraser Public Schools Fraser

Fraser Public Schools/All Elementary Schools New lighting for all elementary gyms

Fraser Public Schools Fraser

Fraser Public Schools/ all sites

Repaint all classrooms not completed under previous construction renovation projects 6/12/2009

9/1/2009

$

100,000

Fraser Public Schools Fraser

Fraser Public Schools/ all sites

Install security cameras district wide on exterior of buildings

6/12/2009

9/1/2009

$

200,000

Fraser Public Schools Fraser

Remodel gang restrooms at elementary: New hard tile floor, new exhaust fan where needed, boys floor urinal replaced with wall, sinks replaced, new ceiling system, remove/reinstall toilet partitions and toilets, door?, signage, mirrors, Lighting, masonry 6/12/2009 Fraser Public Schools/All Elementary Schools wall patch (how much), no ada issues, etc.

9/1/2009

$

270,000

Fraser Public Schools Fraser

Fraser Public Schools/All Elementary Schools Install all new student lockers

6/12/2009

9/1/2009

$

450,000

Fraser Public Schools Fraser

Redo paved basketball courts & the other blacktop play areas. Approximately 88k square feet of play pad. Basketball hoops replaced/reinstalled, striping the asphalt, Fraser Public Schools/All Elementary Schools change in layout or size could impact stone base, etc.

6/12/2009

9/1/2009

$

600,000

Fraser Public Schools/ all sites

6/12/2009

9/1/2009

$

800,000

6/12/2009

9/1/2009

$

250,000

Freeland Community School District

Purchase and install/replace computers for all classrooms Complete the key control system district wide from doors not done under previous bonds. Paint, repair, and cleaning of the gymnasium walls and ceiling at Freeland High School

7/1/2009

7/31/2009

$

40,000

Freeland Community School District

Replacement of worn water gate valves at the Freeland Elementary School

6/15/2009

6/26/2009

$

50,000

Installation of functional mezzanine bleachers at Freeland High School

8/1/2009

8/25/2009

$

75,000

6/15/2009

6/26/2009

$

150,000

Freeland Community School District

Repair and addition to football bleachers at Freeland High School Replacement and installation of playground equipment at the Freeland Learning Center and Freeland Elementary School

6/15/2009

6/26/2009

$

200,000

Fremont-Pathfinder

Replacement of exterior doors and windows to improve energy efficiency

5/1/2009

$

240,000

Fremont-Pine Street

Replacement of exterior doors and windows to improve energy efficiency

5/1/2009

$

275,440

Fremont Middle School

Replacement of exterior doors and windows to improve energy efficiency

4/1/2009

$

1,100,000

Fremont High School

Replacement of exterior doors and windows to improve energy efficiency Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system

6/1/2009

5/1/2011

$

1,550,000

5/1/2009

12/1/2009

$

137,720

Fraser Public Schools Fraser Fraser/Clinton Fraser Public Schools Twp/Roseville Freeland Community School District Freeland Freeland Community School District Freeland Freeland Community School District Freeland Freeland Community School District Freeland Freeland Community School District Freeland Fremont Public School District Fremont Fremont Public School District Fremont Fremont Public School District Fremont Fremont Public School District Fremont Fremont Public School District Fremont

S

02262009

e t t

Freeland Community School District

m b u

Freeland Community School District

Fremont-Pine Street

N s

R d

Fraser Public Schools/ all sites

it

P P A

st

e u

eq

T O

6/12/2009

Submitted Requests - Not Approved

6/12/2009

9/1/2009

Route (Infrastructure Only)

701 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District Fremont Public School District

Jefferson Schools (Monroe)

Jefferson Schools (Monroe)

Location City or Township Fremont

Fremont-Quest

Fremont

Fremont Daisy Brook

Fremont

Fremont-Pathfinder

Fremont

Fremont Middle School

Fremont

Fremont High School

Project Description Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system

Fremont

Fremont-Quest

Renovate classrooms to install technology for 21st Century Learning

5/1/2009

Fremont

Fremont Middle School

Interior renovations of science laboratories to improve educational quality

6/1/2009

Fremont

Fremont High School

Interior renovations of science laboratories to improve educational quality

Fremont

Fremont Daisy Brook

Renovate classrooms to install technology for 21st Century Learning

Fremont

Fremont-Pathfinder

Renovate classrooms to install technology for 21st Century Learning

Fremont

Fremont Middle School

Renovate classrooms to install technology for 21st Century Learning

Jefferson Schools - All District Buildings (5 Schools, Transportation & Service Buildings, Admin Building)

Install water conservation projects, including the retrofit of existing 3.5 GPF toilets with water efficient 1.28 GPF toilets, installation of 1.28 water closet china and Piston flush valves, retrofit existing 2.2 GPM bathroom faucet aerators with water efficient 0.5 GPM VP aerators, and retrofit existing 4.0 GPM Katchen Dishwashing Sparayer with new 1.6 GPM sprayers 4/1/2009

Jefferson Schools - Hurd Road

Replace (16) existing Hydropulse boiler units, many of which are currently inoperable and beyond repair, with eight (8) Hydrotherm GX Series packaged hot water boilers (model GX200). This will reduce utility costs, and avoid loss of heating to this building, which currently accomodates pre-school and Special Education classes. 6/1/2009

Frenchtown

Frenchtown Township

Project Name

Start Date

Expected Completion Date

Funding Request

5/1/2009

12/1/2009

$

267,870

5/1/2009

12/1/2009

$

555,000

5/1/2009

12/1/2009

$

800,000

5/1/2009

12/1/2009

$

1,100,000

$

1,550,000

12/1/2010

$

325,000

12/1/2010

$

384,000

6/1/2009

12/1/2010

$

960,000

5/1/2009

12/1/2010

$

1,235,000

5/1/2009

12/1/2010

$

1,820,000

5/1/2009

12/1/2010

$

2,015,000

7/1/2009

$

170,000

9/1/2009

$

180,000

Jefferson Schools - All District Buildings (5 Schools, Transportation & Service Buildings, Admin Building)

Replace the district's inefficient control system, comprised primarily of pneumatic controls with a series of mechanical time clocks. These clocks do not allow for multiple schedules during the year, or multiple schedules by building zone. Consequently, manual adjustments are required to activate the control feature in our current system. Because of support staff reductions taken in recent years, manual adjustments are frequently not made, resulting in excess fuel and utility costs. To address this inefficiency, we propose installing an open protocol, web-based Facility Management System. This FMS system would interface with hot water systems and boilers, chilled water systems, chillers, condensing units, unit ventilators, and roof top units 6/1/2009

10/1/2009

$

896,000

Jefferson Schools - All District Buildings (5 Schools, Transportation & Service Buildings, Admin Building)

Upgrade and retrofit lighting with more efficient lamps and ballasts. This includes 1) retrofitting existing T-12 fixtures with new T-8 electronic ballasts, 2) replacing older, less efficient fixtures (including de-lamping, or converting to one-lamp fixtures with reflectors, where applicable), 3) replacing metal halide fixtures with high bay flourescent fixtures, 4) replace incandescent lamps with a high quality compact flourescent lamp, where possible, 5) install occupancy sensors

7/1/2009

$

479,000

e u

st

eq

s

A T

O N

O R

5/1/2009

PP

12/1/2009

D VE

Route (Infrastructure Only)

R d

Jefferson Schools (Monroe)

Jefferson Schools (Monroe)

i m

b u S

Frenchtown Township

Frenchtown Township

02262009

e t tt

Submitted Requests - Not Approved

3/1/2009

702 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Jefferson Schools (Monroe)

Jefferson Schools (Monroe) Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District

Project Name

Project Description

Start Date

Jefferson Schools - Jefferson High School

The High School unit ventilators are in very poor condition, including severely deteriorating coils, valves and dampers. An engineering assessment in June 2008 recommended the replacement of (58) existing unit ventilators (circa 1965) with new classroom unit ventilators, to be reconnected to the existing hot/chilled water supply and existing power supply. 6/1/2009

Frenchtown Township

Jefferson Schools - Jefferson High School

Roof repair and replacement. The district has allocated some funds to repair the roof on a section-by-section basis. However, funding is insufficient to make all necessary repairs, and leakages into the building occur during periods of heavy rainfall. Emergency repairs are made regularly. 4/1/2009

Garden City, MI

Burger School for Students with Autism

HVAC Inspection & Repair

Garden City, MI

Cambridge Adult/Community Education Ctr

HVAC Inspection & Repair

Garden City, MI

Farmington Elementary

HVAC Inspection & Repair

Garden City, MI

Lathers Elementary

HVAC Inspection & Repair

Garden City, MI

Memorial Elementary

HVAC Inspection & Repair

Garden City, MI

Douglas Elementary

HVAC Inspection & Repair

Garden City, MI

Henry Ruff Elementary

HVAC Inspection & Repair

Garden City, MI

Administration Building

HVAC Inspection & Repair

Garden City, MI

Garden City Middle School

HVAC Inspection & Repair

Garden City, MI

Administration Building

Garden City, MI

Garden City High School

Garden City, MI

Burger School for Students with Autism

Garden City, MI

Cambridge Adult/Community Education Ctr

Garden City, MI

Farmington Elementary

Garden City, MI

Lathers Elementary

Frenchtown Township

Expected Completion Date

D VE $

950,000

$

150,000

$

25,000

$

25,000

$

25,000

$

25,000

$

25,000

$

25,000

$

25,000

$

25,000

$

50,000

HVAC Control System Upgrades

$

50,000

HVAC Inspection & Repair

$

75,000

HVAC Control System Upgrades

$

75,000

HVAC Control System Upgrades

$

75,000

HVAC Control System Upgrades

$

75,000

HVAC Control System Upgrades

$

75,000

Memorial Elementary

HVAC Control System Upgrades

$

75,000

Douglas Elementary

HVAC Control System Upgrades

$

75,000

Henry Ruff Elementary

HVAC Control System Upgrades

$

75,000

Garden City, MI

Douglas Elementary

Boiler Replacement

$

100,000

Garden City, MI

Henry Ruff Elementary

Boiler Replacement

$

100,000

Garden City, MI

Administration Building

Boiler Replacement

$

100,000

Garden City, MI

Garden City Middle School

HVAC Control System Upgrades

$

125,000

ub

Garden City, MI Garden City, MI

S

Garden City, MI

02262009

tt i m

d e t

T O

s t s

-N

e u

q e R

Submitted Requests - Not Approved

9/1/2009

Funding Request

P P A

O R 6/1/2009

Route (Infrastructure Only)

703 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District Garden City School District

Location City or Township

Start Date

Funding Request

Garden City High School

HVAC Control System Upgrades

$

150,000

Garden City, MI

Burger School for Students with Autism

Boiler Replacement

$

150,000

Garden City, MI

Cambridge Adult/Community Education Ctr

Boiler Replacement

$

150,000

Garden City, MI

Farmington Elementary

Boiler Replacement

$

150,000

Garden City, MI

Lathers Elementary

Boiler Replacement

$

150,000

Garden City, MI

Memorial Elementary

Boiler Replacement

$

150,000

Garden City, MI

Garden City Middle School

Boiler Replacement

$

300,000

Garden City, MI

Garden City High School

Boiler Replacement

$

350,000

Mt. Morris Moore Elementary

Sitework, General Building Work, Exterior/Interior, Mechanical, Electrical, restroom Renovations, Handicap Accessibilty,

$

1,052,404

Oscoda, Glennie Elementary

Roof replacement to increase R value with thermal insulation.

5/22/2009

$

105,700

Greenville Public Schools

Boiler replacement at Middle School 6/8/2009 Partial reroof of Baldwin Heights Elem, Cedar Crest Elem, Walnut Hills Elem, Lincoln Heights Elem. 6/8/2009

8/15/2009

$

120,000

8/15/2009

$

900,000

6/8/2009

8/15/2009

$

275,000

5/1/2009

9/1/2010

$

123,000

5/1/2009

9/1/2010

$

193,000

5/1/2009

9/1/2010

$

342,000

5/1/2009

9/1/2010

$

347,000

5/1/2009

9/1/2010

$

397,000

5/1/2009

9/1/2010

$

408,000

Oscoda Area Schools Glennie Greenville Public Schools Greenville Greenville Public Schools Greenville

Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

Project Description

Garden City, MI

Mt. Morris Consolidated Schools Genesee Township

Greenville Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

Project Name

Expected Completion Date

s

t s e

Greenville Public Schools

Greenville

Greenville Public Schools

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

m b u

GROSSE POINTE

A T

O N

Carpet replacement in f Baldwin Heights Elem, Cedar Crest Elem, Walnut Hills Elem, Lincoln Heights Elem, Greenville Middle School, Greenville High School HOMELAND SECURITY UPGRADE OF PUBLIC ADDRESS SYSTEM AND LIFE SAFETY SYSTEMS AT ALL 9 ELEMENTARY SCHOOLS ENERGY CONSERVATION MEASURES TO REPLACE CAULKING AND SEALING AT ALL 16 BUILDINGS ENERGY CONSERVATION MEASURES TO ADD EXTRA ROOF INSULATION AT ALL 16 BUILDINGS HOMELAND SECURITY ADDITION OF ACCESS CONTROLS TO DOORS AT ALL 16 BUILDINGS HOMELAND SECURITY ADDITION OF SECURITY CAMERAS TO ALL 16 BUILDINGS GREEN SUSTAINABLE REPLACEMENT OF GYM, POOL AND CAFETERIA CEILINGS AT ALL 16 BUILDINGS

u q e

R d

e t t

it

O R

PP

4/22/2009

D VE

GPPS/

VARIOUS

GREEN SUSTAINABLE REPAINTING OF CLASSROOMS AT ALL 16 BUILDINGS

5/1/2009

9/1/2010

$

1,192,000

GPPS/

VARIOUS

ACM REMEDIATION DISTRICT WIDE

5/1/2009

9/1/2010

$

3,000,000

GPPS/

ADM BLDG

9/1/2010

$

28,000

GROSSE POINTE

GPPS/

VARIOUS

9/1/2010

$

68,000

GROSSE POINTE

GPPS/

VARIOUS

9/1/2010

$

100,000

GROSSE POINTE

GPPS/

VARIOUS

9/1/2010

$

150,000

GROSSE POINTE

GPPS/

VARIOUS

9/1/2010

$

195,000

GROSSE POINTE

S

GROSSE POINTE

02262009

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK 5/1/2009 ENERGY CONSERVATION MEASURES FOR REPLACEMENT OF EXTERIOR ENTRY DOORS AT ALL 9 ELEMENTARY SCHOOLS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF GYM, POOL AND CAFETERIA FLOORS AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF LOCKER ROOM CEILINGS AT ALL 16 BUILDINGS 5/1/2009 INFRASTRUCTURE: REPLACEMENT OF ORIGINAL SANITARY SEWER PIPING AT ALL 16 BUILDINGS 5/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

704 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

Location City or Township

Project Name

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

MAIRE

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

ADM BLDG

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE

GPPS/

VARIOUS

GROSSE POINTE GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS

GPPS/

VARIOUS

GPPS/

VARIOUS

Project Description Start Date INFRASTRUCTURE: REPLACEMENT OF ORIGINAL WATER MAIN PIPING AT ALL 16 BUILDINGS 5/1/2009 INFRASTRUCTURE: REPLACEMENT OF ORIGINAL STORM SEWER PIPING AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF CORRIDOR FLOORS AT ALL 16 BUILDINGS 5/1/2009 ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF CORRIDOR CEILINGS AT ALL 16 BUILDINGS 5/1/2009 HOMELAND SECURITY ADDITION OF FENCES AND GATES AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF OFFICE AND LIBRARY FLOORS AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF OFFICE AND LIBRARY CEILINGS AT ALL 16 BUILDINGS 5/1/2009 INFRASTRUCTURE: REPAIR OF FAILING INTERIOR GYM WALLS AND REPLACEMENT OF SINKING FLOORS AT NORTH AND POUPARD 5/1/2009 ALTERNATIVE ENERGY: ADD 2 WIND TURBINES TO POWER 8 CLASSROOMS PER SCHOOL FOR 15 SCHOOLS 5/1/2009

$

378,000

9/1/2010

$

380,000

$

420,600

$

426,000

$

427,000

9/1/2010

$

500,000

9/1/2010

$

520,000

9/1/2010

$

521,000

9/1/2010

$

550,000

9/1/2010

$

674,000

9/1/2010

$

694,000

9/1/2010

$

751,000

9/1/2010

$

800,000

9/1/2010

$

1,510,000

e u

9/1/2010

$

1,550,000

eq

9/1/2010

$

1,607,000

9/1/2010

$

1,986,000

9/1/2010

$

3,683,000

9/1/2010

$

6,400,000

9/1/2010

$

67,000

9/1/2010

$

616,000

9/1/2010

$

2,183,000

9/1/2010

$

2,520,000

5/1/2009

9/1/2010

$

96,000

5/1/2009

9/1/2010

$

941,000

5/1/2009

9/1/2010

$

81,000

O N

R d

e t t

GPPS/

VARIOUS

GPPS/

VARIOUS

GPPS/

VARIOUS

ALTERNATIVE ENERGY: ADD SOLAR PANELS FOR 15 SCHOOLS 5/1/2009 HOMELAND SECURITY UPGRADE OF PUBLIC ADDRESS SYSTEM AND LIFE SAFETY SYSTEMS AT ALL 3 MIDDLE SCHOOLS 5/1/2009 ENERGY CONSERVATION MEASURES TO REPLACE 4 TRANSFORMERS AT NORTH AND SOUTH HIGH SCHOOLS 5/1/2009 HOMELAND SECURITY REPLACEMENT OF INTERIOR DOORS AND HARDWARE AT ALL 3 MIDDLE SCHOOLS 5/1/2009 ENERGY CONSERVATION MEASURES FOR REPLACEMENT OF EXTERIOR WINDOWS AT ALL 2 HIGH SCHOOLS 5/1/2009

GROSSE POINTE CITY

GPPS/

MAIRE

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

GROSSE POINTE CITY GROSSE POINTE FARMS

GPPS/

MAIRE

GPPS/

RICHARD

m b u

S

02262009

it

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

Submitted Requests - Not Approved

9/1/2010 9/1/2010

O R

PP

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING 5/1/2009 ENERGY CONSERVATION MEASURES TO EXTEND BUILDING MANAGEMENT SYSTEM AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPAINTING OF OFFICE AND LIBRARY AT ALL 16 BUILDINGS 5/1/2009 ENERGY CONSERVATION MEASURES FOR REPLACEMENT OF EXTERIOR WINDOWS AT ALL 9 ELEMENTARY SCHOOLS 5/1/2009 ENERGY CONSERVATION MEASURES FOR RECOMMISSIONING ALL HVAC EQUIPMENT IN THE DISTRICT AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF CLASSROOM CEILINGS AT ALL 16 BUILDINGS 5/1/2009 GREEN SUSTAINABLE REPLACEMENT OF CLASSROOM FLOORS AT ALL 16 BUILDINGS 5/1/2009 HOMELAND SECURITY REPLACEMENT OF INTERIOR DOORS AND HARDWARE AT ALL 9 ELEMENTARY SCHOOLS 5/1/2009

st

Funding Request

9/1/2010

A T

s

Expected Completion Date

9/1/2010

D VE

Route (Infrastructure Only)

705 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Grosse Pointe Public Schools

GROSSE POINTE FARMS

Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS

Grosse Pointe Public Schools Grosse Pointe Public Schools

GROSSE POINTE FARMS GROSSE POINTE FARMS

Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS GROSSE POINTE FARMS AND WOODS GROSSE POINTE FARMS AND WOODS

Grosse Pointe Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

GPPS/

RICHARD

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

GPPS/

KERBY

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

GPPS/

SOUTH

5/1/2009

9/1/2010

GPPS/

VARIOUS

SOUTH RECEIVING ROOM ENTRY ENERGY CONSERVATION MEASURES FOR REPLACEMENT OF EXTERIOR ENTRY DOORS AT ALL 3 MIDDLE SCHOOLS

5/1/2009

GPPS/

RICHARD

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING

5/1/2009

GPPS/

SOUTH

SOUTH HIGH SCHOOL COORIDOR LIGHTING REPLACEMENT

5/1/2009

GPPS/

SOUTH

GPPS/

Funding Request

$

123,000

D VE $

154,000

$

154,000

$

303,000

9/1/2010

$

455,000

O R 9/1/2010

9/1/2010

$

491,000

5/1/2009

9/1/2010

$

505,000

VARIOUS

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK ENERGY CONSERVATION MEASURES FOR REPLACEMENT OF EXTERIOR ENTRY DOORS AT ALL 2 HIGH SCHOOLS

PP

5/1/2009

9/1/2010

$

550,000

GPPS/

BROWNELL

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

602,000

GPPS/

BROWNELL

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR PARKING LOTS

5/1/2009

9/1/2010

$

737,000

GPPS/

KERBY

5/1/2009

9/1/2010

$

966,000

GPPS/

KERBY

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

1,005,000

GPPS/

SOUTH

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR PARKING LOTS

5/1/2009

9/1/2010

$

1,020,000

GPPS/

BROWNELL

5/1/2009

9/1/2010

$

1,048,000

GPPS/

BROWNELL

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR ROOF ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

1,967,000

GPPS/

SOUTH

SOUTH MULTIPURPOSE/STUDENT COMMONS/GYM REMODELING

5/1/2009

9/1/2010

$

2,762,000

GPPS/

BROWNELL

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

$

2,951,000

GPPS/

SOUTH

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

$

3,130,000

9/1/2010

$

4,200,000

9/1/2010

$

4,342,000

9/1/2010

$

89,000

9/1/2010

$

2,750,000

9/1/2010

$

2,906,000

eq

s

st

e u

O N

R d

e t t

it

m b u

A T

GPPS/

BROWNELL

GPPS/

SOUTH

GPPS/

VARIOUS

GPPS/

VARIOUS

GPPS/

VARIOUS

BROWNELL MULTI-PURPOSE ROOM ADDITION 5/1/2009 ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK 5/1/2009 HOMELAND SECURITY UPGRADE OF PUBLIC ADDRESS SYSTEM AND LIFE SAFETY SYSTEMS AT ALL 9 ELEMENTARY SCHOOLS 5/1/2009 INFRASTRUCTURE: MASONRY REPAIR AT SOUTH, MONTEITH, PARCELLS, AND NORTH 5/1/2009 HOMELAND SECURITY REPLACEMENT OF INTERIOR DOORS AND HARDWARE AT ALL 2 HIGH SCHOOLS 5/1/2009

GROSSE POINTE PARK GPPS/

DEFER

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR ROOF

5/1/2009

9/1/2010

$

90,000

GROSSE POINTE PARK GPPS/

DEFER

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

103,000

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

706 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

GROSSE POINTE PARK GPPS/

TROMBLY

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

GROSSE POINTE PARK GPPS/

PIERCE

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

GROSSE POINTE PARK GPPS/

PIERCE

5/1/2009

9/1/2010

GROSSE POINTE PARK GPPS/

DEFER

GROSSE POINTE PARK GPPS/

Funding Request

$

193,000

D VE $

493,000

$

639,000

$

767,000

PP

9/1/2010

$

1,219,000

9/1/2010

$

1,289,000

5/1/2009

9/1/2010

$

1,321,000

5/1/2009

9/1/2010

$

1,763,000

5/1/2009

PIERCE

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR OLD ROOF ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

GROSSE POINTE PARK GPPS/

TROMBLY

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING

5/1/2009

GROSSE POINTE PARK GPPS/

DEFER

GROSSE POINTE PARK GPPS/

TROMBLY

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

GROSSE POINTE PARK GPPS/ GROSSE POINTE WOODS GPPS/

PIERCE

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

$

2,088,000

PARCELLS

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR OLD ROOF

5/1/2009

9/1/2010

$

156,000

Grosse Pointe Public Schools Grosse Pointe Public Schools

GROSSE POINTE WOODS GROSSE POINTE WOODS

GPPS/

FERRY

GPPS/

Grosse Pointe Public Schools

GROSSE POINTE WOODS

Grosse Pointe Public Schools

GROSSE POINTE WOODS

Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS

Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools

GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS

02262009

A T

s

O N

5/1/2009

9/1/2010

$

161,000

FERRY

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

174,000

GPPS/

BARNES

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

205,000

GPPS/

MONTEITH

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

205,000

GPPS/

MASON

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

207,000

GPPS/

PARCELLS

PARCELLS MAINTENANCE CARPORT ADDITION

5/1/2009

9/1/2010

$

236,000

GPPS/

FERRY

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR ROOF

5/1/2009

9/1/2010

$

240,000

5/1/2009

9/1/2010

$

440,000

5/1/2009

9/1/2010

$

559,000

d e tt

it

m b u

S

5/1/2009

O R 9/1/2010

st

e u

q e R

GPPS/

NORTH

GPPS/

BARNES

NORTH HIGH SCHOOL CAFETERIA IMPROVEMENTS ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

GPPS/

PARCELLS

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

591,000

GPPS/

PARCELLS

PARCELLS MUSIC ADDITION

5/1/2009

9/1/2010

$

600,000

GPPS/

NORTH

NORTH HIGH SCHOOL PERFORMING ARTS CENTER ELECTRICAL UPGRADES 5/1/2009

9/1/2010

$

616,000

GPPS/

NORTH

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR PARKING LOTS

9/1/2010

$

991,000

Submitted Requests - Not Approved

5/1/2009

Route (Infrastructure Only)

707 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools Essexville-Hampton Public Schools

Public Schools Of Calumet Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools

GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS GROSSE POINTE WOODS

Project Name

Project Description

Start Date

Expected Completion Date

GPPS/

NORTH

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

5/1/2009

9/1/2010

GPPS/

BARNES

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

GPPS/

MASON

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

GPPS/

MONTEITH

5/1/2009

9/1/2010

GPPS/

MONTEITH

5/1/2009

GPPS/

MASON

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

GPPS/

FERRY

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING

GPPS/

NORTH

GPPS/

NORTH

GPPS/

PARCELLS

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR OLD ROOF ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

GPPS/

PARCELLS

INFRASTRUCTURE: REPLACEMENT OF 60-80 YEAR OLD INTERIOR PIPING

GPPS/

NORTH

Funding Request

$

1,004,000

D VE $

1,018,000

$

1,069,000

$

1,304,000

$

1,392,000

9/1/2010

$

1,456,000

5/1/2009

9/1/2010

$

1,536,000

5/1/2009

9/1/2010

$

1,560,000

5/1/2009

9/1/2010

$

1,586,000

5/1/2009

9/1/2010

$

1,922,000

5/1/2009

9/1/2010

$

3,030,000

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

$

4,538,000

T O

s t s

P P A

O R

-N

5/1/2009

9/1/2010

Hampton Township

Essexville-Hampton Air Quality Upgrades

Upgrade airflow to HVAC system to improve efficiency and airflow in classrooms.

6/15/2009

8/15/2009

$

19,000

Hampton Township

Essexville-Hampton Verellen Elementary-

Replace and repair portions of the roof on the southwest section of the building.

6/15/2009

8/15/2009

$

25,000

Hampton Township

Essexville-Hampton Bush Elementary

6/15/2009

8/15/2009

$

95,000

$

8,820,000

d e t

e u

q e R

Replace the roof on the middle and west wings of the building. erecting, furnishing and equipping additions to the high school building; remodeling, refurnishing and re-equipping school buildings; acquiring and installing educational technology improvements; constructing a new bus garage; and developing and improving playgrounds, athletic fields and facilities and sites.

Hancock

Hancock Public Schools

Harbor Springs

Harbor Springs, Middle/High School

Automatic Back-up System

6/1/2009

8/28/2009

$

60,000

Harbor Springs

Harbor Springs, High School/Middle School

6/15/2009

8/28/2009

$

80,000

Harbor Springs, Shay Elementary

Replace lights in High School and Middle School Gym with Energy efficient lights Playground enhancement - This would allow us to remove old wooden playgound stucture.

6/15/2009

8/28/2009

$

100,000

Harbor Springs, High School

Consolidation of Servers at the high school

6/1/2009

8/28/2009

$

130,000

Harbor Springs, All Schools

6/1/2009

8/28/2009

$

150,000

Harbor Springs Schools

Wireless VLAN for all buildings Install a new Key card system throughout the district. This will allow us to better manage and control access and identify users.

6/1/2009

8/28/2009

$

153,000

Harbor Springs

Harbor Springs Schools, District

Add a 6,000 square foot metal storage shed to house district equipment such as tractors, tools, snow removal and track & field equipment. This would replace a 1950's Quonset hut.

6/1/2009

8/28/2009

$

380,000

Harbor Springs

Harbor Springs, All Schools

Five year computer replacment plan

6/1/2009

8/28/2009

$

550,000

Harbor Springs

Harbor Springs, High School

Renovate Locker rooms and PE/Coaches Office

6/1/2009

8/28/2009

$

1,185,000

m b u

Harbor Springs Harbor Springs

S

Harbor Springs Harbor Springs

02262009

itt

Submitted Requests - Not Approved

Route (Infrastructure Only)

708 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Boyne City Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Grosse Pointe Public Schools Bark River-Harris School District Bark River-Harris School District Bark River-Harris School District Bark River-Harris School District Bark River-Harris School District Bark River-Harris School District Bark River-Harris School District Bark River-Harris School District L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Harbor Springs

Harbor Springs, High School

Relocate High School Servers out of the boiler room

6/1/2009

8/28/2009

$

90,000

Harbor Springs

Harbor Springs, High School

New Fencing & railing at Ottawa Stadium

6/1/2009

8/28/2009

$

20,000

Harbor Springs

Harbor Springs, High School Complex

Pave All Athletic Fields Parking Lots

6/1/2009

8/28/2009

$

115,000

Harbor Springs

Harbor Springs, High School

Replace upper gym floor

6/15/2009

8/28/2009

$

154,000

Harbor Springs

Harbor Springs, High School

Replace lockers in the high school

6/15/2009

$

180,000

Harbor Springs

Harbor Springs, High School

Replace Tennis Courts

6/1/2009

$

265,000

Harbor Springs

Harbor Springs, High School

Add Trophy Cabinets to the High School

6/15/2009

8/28/2009

$

50,000

HARPER WOODS

GPPS/

POUPARD

ENERGY CONSERVATION MEASURES FOR ELECTRICAL LIGHTING CONTROLS HVAC EQUIPMENT AND UPGRADES WITH A 5 YEAR PAY-BACK

PP

8/28/2009

5/1/2009

9/1/2010

$

245,000

HARPER WOODS

GPPS/

POUPARD

5/1/2009

9/1/2010

$

1,063,000

HARPER WOODS

GPPS/

POUPARD

INFRASTRUCTURE: REPLACEMENT OF 20 YEAR PARKING LOTS ENERGY CONSERVATION MEASURES FOR HVAC EQUIPMENT AND UPGRADES WITH A GREATER THAN 5 YEAR PAY-BACK

5/1/2009

9/1/2010

$

1,179,000

HARPER WOODS

GPPS/

POUPARD

INFRASTRUCTURE: REPLACEMENT OF 30-50 YEAR OLD INTERIOR PIPING

5/1/2009

9/1/2010

$

1,394,000

Harris

Bark River-Harris Schools Gym Lighting

Replace and upgrade gym lights

5/1/2009

6/30/2009

$

15,000

Harris

Bark River-Harris Schools Boiler project

Replacement of two boilers

5/1/2009

6/30/2009

$

56,000

Harris

Bark River-Harris Schools Security System

Security in a new door locking system

5/1/2009

6/30/2009

$

18,000

Harris

Bark River-Harris Schools Clock system Bark River-Harris Schools Computer Lab Upgrade

Student transition and time management

5/1/2009

6/30/2009

$

20,000

Replace 32 computers in main lab

5/1/2009

6/30/2009

$

25,000

Safe Guard the students and facility

5/1/2009

6/30/2009

$

30,000

Add a paraprofessional to support student needs

7/1/2009

9/1/2009

$

35,000

Add a half time special education teacher and renovate a room for life skills.

7/1/2009

9/1/2009

$

66,000

Improve site drainage, manage vegetation growth Installation of security cameras, recording equipment and other technology District wide, for safety and security of students. Add heating coil to existing AHU, remove inefficient heating coil, renovate newlyvacant space.

6/1/2009

9/1/2009

$

100,000

6/1/2009

12/1/2009

$

210,000

6/1/2009

9/1/2009

$

20,000

Enhance heating to meet district standards

6/1/2009

9/1/2009

$

20,000

Remove & replace outdated, inefficient AHU

6/1/2009

9/1/2009

$

30,000

Remove & replace outdated, inefficient AHU

6/1/2009

9/1/2009

$

30,000

Remove & replace seven (7) outdated, inefficient AHU's

6/1/2009

9/1/2009

$

140,000

Harris Harris

A T

Harris

Bark River-Harris Schools Security Fencing Bark River-Harris Schools Provide supports for Title1 children

Harris

Bark River-Harris Schools Provide special education supports and renovation

itt

d e t

m b u

Harrison Twp. Harrison Twp.

LCPS MSS Site Drainage Installation

Harrison Twp.

LCPS District Security LCPS HS Wrestling Room HVAC Modifications LCPS South River Elementary Receiving Room Heating Modifications LCPS Lobbestael Elementary Media Center AHU Replacement LCPS Yacks Elementary Media Center AHU Replacement

Harrison Twp.

LCPS MSS AHU Replacements

S

Harrison Twp. Harrison Twp. Harrison Twp.

02262009

st

e u

q e R

s

O N

Submitted Requests - Not Approved

O R 8/28/2009

D VE

Route (Infrastructure Only)

709 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Hartland Consolidated Schools Hartland

Hartland Schools occupancy sensors

install lighting occupancy sensors in classrooms at Round Elementary (30), Village Elementary (30), and the 51 Building (15)

8/1/2009

9/15/2009

Hartland Consolidated Schools Hartland

Hartland Schools air-handling units

replace the rooftop air-handling at the 51 Building

8/15/2009

12/31/2009

Hartland Consolidated Schools Hartland

Hartland Schools window replacement

replace 600 SF of single glazed windows at Village Elementary with energy efficient thermopane windows

8/1/2009

12/31/2009

Hartland Consolidated Schools Hartland

Hartland Schools window replacement

replace 700 SF of single glazed windows at the 51 Building with energy efficient thermopane windows

8/1/2009

Hartland Consolidated Schools Hartland

Hartland Schools window replacement

replace 1,100 SF of single glazed windows at Lakes Elementary with energy efficient thermopane windows 8/1/2009

Hartland Consolidated Schools Hartland

Hartland Schools roof replacement

replace 20,500 SF of roofing on the 51 Building (child care / pre-school facility)

Hartland Consolidated Schools Hartland

Hartland Schools roof replacement

replace 6,000 SF of roofing on the Transportation Building

Hartland Consolidated Schools Hartland

Hartland Schools water softener

install water softener system at Lakes Elementary

Hartland Consolidated Schools Hartland

Hartland Schools energy management

Hartland Consolidated Schools Hartland

Hartland Schools water service

Hartland Consolidated Schools Hartland

Hartland Schools water service

Hartland Consolidated Schools Hartland

Hartland Schools exterior doors

Hartland Consolidated Schools Hartland Hartland Consolidated Schools Hartland

Funding Request

$

27,000

D VE $

36,000

$

41,000

12/31/2009

$

48,000

12/31/2009

$

76,000

6/15/2009

9/1/2009

$

140,000

6/15/2009

9/1/2009

$

190,000

6/15/2009

8/1/2009

$

10,000

install new Direct Digital Control system for electrical and mechanical equipment in 9 buildings 6/15/2009

9/15/2009

$

1,435,000

install new main water supply line to the 51 Building

8/1/2009

12/31/2009

$

19,000

install new main water supply line to Round Elementary

8/1/2009

12/31/2009

$

38,000

replace five (5) exterior doors and frames at the 51 Building

6/15/2009

9/1/2009

$

19,000

Hartland Schools exterior doors

replace eight (8) exterior doors and frames at Round Elementary

6/15/2009

9/1/2009

$

30,000

Hartland Schools paving

repave 13,500 SF of parking and drives at the 51 Building

6/15/2009

9/1/2009

$

55,000

Hartland Schools paving

repave 50,000 SF of parking and drives at Creekside Elementary

6/15/2009

9/1/2009

$

200,000

Hartland Schools computers/ servers

replace 1600 existing outdated classroom computers and 10 servers District-wide

6/15/2009

8/15/2009

$

2,000,000

Hartland Consolidated Schools Hartland

Hartland Schools classroom presentation systems

install 332 classroom presentation systems (video projector, smart board, document camera, and sound distribution)

6/15/2009

9/15/2009

$

2,325,000

Hartland Consolidated Schools Hartland Twp.

Hartland Schools heat pumps

replace 25 old, inefficient heat pumps with new energy efficient heat pumps at Lakes Elementary 8/1/2009

12/31/2009

$

47,000

d e tt

t i m

ub

Hartland Consolidated Schools Hartland Hartland Consolidated Schools Hartland

02262009

S

N s

st

e u

q e R

T O

P P A

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

710 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Hartland Consolidated Schools Hartland Twp.

Hartland Schools heat pumps

replace 45 old, inefficient heat pumps with new energy efficient heat pumps at Farms Intermediate School 8/1/2009

12/31/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools boilers

replace 33 year old boilers and circulation pumps at Lakes Elementary School

8/15/2009

12/31/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools air-handling units

replace three (3) rooftop air-handling units on the Educational Support Service Center 8/15/2009

12/31/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools boilers

replace 33 year old boilers and circulation pumps at Farms Intermediate School

Hartland Consolidated Schools Hartland Twp.

Hartland Schools lighting and occupancy sensors

replace lighting and install occupancy sensors in 30,000 SF of the Educational Support Service Center building (includes replacement of no longer available coffered ceiling system, rework of linear diffusers, and relocation of existing sprinkler heads) 8/15/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools boilers

replace 37 year old boilers and circulation pumps at the Educational Support Service Center building 8/15/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools roof replacement

replace 208,000 SF of roofing on the Educational Support Service Center building

Hartland Consolidated Schools Hartland Twp.

Hartland Schools air-handling units

replace six (6) rooftop air-handling units on the Educational Support Service Center

Hartland Consolidated Schools Hartland Twp.

Hartland Schools water service

install new main water supply line to the Educational Support Service Center building 8/1/2009

Hartland Consolidated Schools Hartland Twp.

Hartland Schools paving

Hartland Consolidated Schools Hartland Twp.

Hartland Schools paving

Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools

d e t

T O

s t s

e u

q e R

$

84,000

D VE $

135,000

$

288,000

12/31/2009

$

325,000

12/31/2009

$

450,000

12/31/2009

$

900,000

6/15/2009

9/1/2009

$

1,780,000

6/15/2009

9/15/2009

$

576,000

12/31/2009

$

63,000

8/15/2009

O R

P P A

-N

Funding Request

repave 50,000 SF of parking and drives at Lakes Elementary

6/15/2009

9/1/2009

$

200,000

repave 75,000 SF of parking and drives at Farms Intermeidate School

6/15/2009

9/1/2009

$

300,000

$

15,000,000

Hesperia

Hesperia Community Schools

remodeling, furnishing and refurnishing, and equipping and re-equipping school facilities, including safety and security upgrades; constructing, furnishing, and equipping additions to school facilities; and constructing, equipping, developing and improving playgrounds, the school site and athletics facilities.

Hesperia

Hesperia Community Schools

Solar panels to reduce use of traditional energy sources

4/1/2009

6/1/2009

$

190,000

Hesperia Community Schools

Air condition present server room

4/1/2009

6/1/2009

$

5,000

Hesperia Community Schools

Wireless networking-30 access points and associated cabling,

4/1/2009

6/1/2009

$

15,000

Hesperia Community Schools

Digital sign board to display events and activities

4/1/2009

6/1/2009

$

20,000

Hesperia Community Schools

Update application software

4/1/2009

6/1/2009

$

25,000

Hesperia

Hesperia Community Schools

Upgrade telephone system

4/1/2009

6/1/2009

$

50,000

Hesperia

Hesperia Community Schools

Interactive white boards in all classrooms

4/1/2009

6/1/2009

$

90,000

Hesperia

Hesperia Community Schools

Additional mobile labs 3 labs @ 30 laptops plus cart, printers and access point

4/1/2009

6/1/2009

$

98,000

tt i m

ub

Hesperia Hesperia Hesperia Hesperia

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

711 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Hesperia Community Schools Hesperia

Hesperia Community Schools Hesperia Community Schools Hesperia Community Schools

Holland City School District

Holland City School District

Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District

Holland City School District Holland City School District

Holland City School District Holland City School District Holland City School District Holland City School District

Project Name

Project Description

Start Date

Expected Completion Date

Hesperia Community Schools

LCD televisions in all classrooms

4/1/2009

6/1/2009

Hesperia

Hesperia Community Schools

Emergency generator to operate lighting, HVAC system, telephones and computer network in the event of power failure. A generator system will also allow the school to become an emergency shelter for community members. 4/1/2009

6/1/2009

Hesperia

Hesperia Community Schools

New classroom furniture for all rooms

4/1/2009

6/1/2009

Hesperia

Hesperia Community Schools

Replace aging computers 300 pc's @ $800 each

4/1/2009

Holland Public Schools - Jefferson K-7

Energy efficient lighting upgrades - Lighting retrofits to energy efficient lighting fixtures, replace incandescent bulbs with fluorescent light bulbs, install energy efficient outdoor lighting and security lighting, new energy efficient lighted signage, timers, occupancy sensors and control systems - Jefferson K-7 6/1/2009

Holland Public Schools - East K-7

Energy efficient lighting upgrades - Lighting retrofits to energy efficient lighting fixtures, replace incandescent bulbs with fluorescent light bulbs, install energy efficient outdoor lighting and security lighting, new energy efficient lighted signage, timers, occupancy sensors and control systems - East K-7 6/1/2009

Funding Request $

D VE

130,000

$

180,000

$

200,000

$

240,000

9/1/2009

$

260,000

9/1/2009

$

275,000

9/1/2009

$

275,000

6/1/2010

$

325,000

6/1/2009

6/1/2010

$

325,000

7/1/2009

9/1/2009

$

345,000

6/1/2010

9/1/2010

$

345,000

Holland

Holland Public Schools - West K-7

Energy efficient lighting upgrades - Lighting retrofits to energy efficient lighting fixtures, replace incandescent bulbs with fluorescent light bulbs, install energy efficient outdoor lighting and security lighting, new energy efficient lighted signage, timers, occupancy sensors and control systems - West K-7 6/1/2009

9/1/2009

$

350,000

Holland

Implement new control systems District wide with occupancy sensors, HVAC setback Holland Public Schools - District Wide Control controls, remote devices to more accurately control temperatures and usage - District Systems Wide Control Systems 6/1/2009

6/1/2010

$

350,000

9/1/2009

$

425,000

9/1/2010

$

425,000

6/1/2010

$

475,000

6/1/2010

$

475,000

Holland

Holland

T O

Holland

Holland Public Schools - Heights K-7

Holland

Holland Public Schools - Jefferson K-7

Holland

Holland Public Schools - District Wide Plumbing & Bathroom

Holland

Holland Public Schools - Lakeview

Holland

Holland Public Schools - VanRaalte

Holland Holland Holland Holland

02262009

N s

Energy efficient lighting upgrades - Lighting retrofits to energy efficient lighting fixtures, replace incandescent bulbs with fluorescent light bulbs, install energy efficient outdoor lighting and security lighting, new energy efficient lighted signage, timers, occupancy sensors and control systems - Heights K-7 6/1/2009 Repaint, re-carpet rooms with low volatile organic compounds (VOC) paints & carpet Jefferson K-7 6/1/2009

e u

st

Update and install low flow toilet fixtures and sinks to reduce water consumption, install water-less urinals and update bathrooms to meet current access standards District Wide Plumbing & Bathroom Recycle and enhance the lakeview site and work with city officials on installation of common green areas and park facilities - Lakeview Replace single pane windows with energy efficient windows to improve building envelope - VanRaalte

eq

R d

i m

e t tt

S

ub

P P A

Energy efficient lighting upgrades - Lighting retrofits to energy efficient lighting fixtures, replace incandescent bulbs with fluorescent light bulbs, install energy efficient outdoor lighting and security lighting, new energy efficient lighted signage, timers, Holland Public Schools - High School occupancy sensors and control systems - High School 7/1/2009 Replace single pane windows with energy efficient windows to improve building Holland Public Schools - Heights K-7 envelope - Heights K-7 6/1/2010 Repaint, re-carpet rooms with low volatile organic compounds (VOC) paints & carpet East K-7 6/1/2009 Holland Public Schools - East K-7 Holland Public Schools - Boiler Replacement - Replace unit vent systems and control systems for building - Boiler Replacement West West 6/1/2009

Submitted Requests - Not Approved

O R 6/1/2009

Route (Infrastructure Only)

712 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District

Location City or Township

Project Name

Holland

Holland Public Schools - West K-7

Holland

Holland Public Schools - East K-7

Holland

Holland Public Schools - High School

Holland

Holland Public Schools - West K-7

Holland

Holland Public Schools - High School

Holland

Holland Public Schools - Longfellow

Holland

Holland Public Schools - West K-7

Holland

Holland Public Schools - Jefferson K-7

Holland

Holland Public Schools - High School

Holland

Holland Public Schools - High School PAC

Holland

Holland Public Schools - District Wide

Holland

Holland Public Schools - District Wide

Holland

Holland Public Schools - District

Holland

Holland Public Schools - East K-7

Holland

Holland Public Schools - East K-7

Holland

Holland Public Schools - High School Data Center

d e t

Holland

Holland Public Schools - VanRaalte

Holland

Holland Public Schools - East K-7

Holland

Holland Public Schools - Heights K-7

tt i m

ub

Holland

Holland Public Schools - High School

Holland Holland

Holland

Holland Public Schools - Jefferson K-7

S

Holland Public Schools - West K-7

Holland Public Schools - District Security

Holland

Holland Public Schools - Longfellow

Holland

Holland Public Schools - Washington

02262009

Project Description Start Date Repaint, re-carpet rooms with low volatile organic compounds (VOC) paints & carpet West K-7 6/1/2009 Replace single pane windows with energy efficient windows to improve building envelope - East K-7 6/1/2010 Repaint, re-carpet rooms with low volatile organic compounds (VOC) paints & carpet High School 6/1/2009 Replace single pane windows with energy efficient windows to improve building envelope - West K-7 6/1/2010 Replace single pane windows with energy efficient windows to improve building envelope - High School 6/1/2010 Bring Longfellow School up to current standards for building safety, occupancy, building energy efficiency and student needs - Longfellow 6/1/2009

s t s

-N

e u

q e R

Update Data center to allow for appropriate disaster recovery, off-line power generation, data security and facility security - High School Data Center Renovate and renew the existing building to allow for distance learning, Michigan virtual high school and other programs targeted for at risk and non-traditional high school students - VanRaalte Install wireless access points in school buildings to allow students and staff to use adaptive technology in the classroom setting - East K-7 Install wireless access points in school buildings to allow students and staff to use adaptive technology in the classroom setting - Heights K-7 Install wireless access points in school buildings to allow students and staff to use adaptive technology in the classroom setting - High School Install wireless access points in school buildings to allow students and staff to use adaptive technology in the classroom setting - Jefferson K-7 Install wireless access points in school buildings to allow students and staff to use adaptive technology in the classroom setting - West K-7 Improve Security and reduce operational costs through installation of security surveillance upgrades, including proximity card door access and video surveillance District wide - District Security Upgrade and/or replace playground equipment to meet mandatory safety standards for the Longfellow building - Longfellow Upgrade and/or replace playground equipment to meet mandatory safety standards for the Washington Area building - Washington

Submitted Requests - Not Approved

Funding Request

6/1/2010

$

500,000

9/1/2010

$

675,000

$

750,000

$

750,000

$

1,212,000

6/1/2011

$

3,500,000

6/1/2009

6/1/2011

$

4,850,000

6/1/2009

9/1/2009

$

1,825,000

6/1/2009

6/1/2010

$

45,000

6/1/2009

9/1/2009

$

62,000

6/1/2009

6/1/2010

$

140,000

6/1/2009

12/1/2009

$

220,000

6/1/2009

9/1/2009

$

25,000

3/1/2009

5/1/2009

$

30,000

6/1/2009

8/31/2009

$

45,000

6/1/2009

9/1/2009

$

95,000

6/1/2009

9/1/2009

$

125,000

6/1/2009

9/1/2009

$

140,000

6/1/2009

9/1/2009

$

140,000

6/1/2009

9/1/2009

$

140,000

6/1/2009

9/1/2009

$

140,000

6/1/2009

9/1/2009

$

140,000

6/1/2009

9/1/2009

$

157,000

6/1/2009

9/1/2009

$

190,000

6/1/2009

9/1/2009

$

190,000

6/1/2010 9/1/2010

O R

P P A

renovate the interior space of west K-7 to bring in natural light and natural materials which will help reduce utilities and improve the positive flow of the building - West K-7 Phase II of roof replacement, energy efficiency lighting installation and installation of energy efficiency windows and doors - Jefferson K-7 Install distance learning community flexible spaces for Holland High School - High School Install electronic projection and control system in High School Auditorium to enhance facility usage - High School PAC Install distance learning community flexible spaces to all for K-7 buildings - District Wide Improve emergency preparedness communication systems across the District District Wide Improve data and computer network security with the installation of a firewall, VPN and caching appliance District wide. - District Install electronic projection and control system in the K-7 multi-purpose space to enhance facility usage - East K-7 Enhance security for pedestrian walk way for East K-7and connect with the existing City of Holland park property - East K-7

T O

Expected Completion Date

9/1/2010

D VE

Route (Infrastructure Only)

713 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Holland City School District Holland Holland City School District Holland Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District Holland City School District

Holland City School District Holland City School District Holland City School District Black River Public School Black River Public School

Black River Public School

West Ottawa Public School District

West Ottawa Public School District

West Ottawa Public School District

Project Name

Project Description Upgrade and/or replace playground equipment to meet mandatory safety standards for K-7 building - East K-7 Upgrade and/or replace playground equipment to meet mandatory safety standards for K-7 building - Heights K-7

Holland Public Schools - East K-7 Holland Public Schools - Heights K-7

Start Date

9/1/2009

$

210,000

6/1/2009

9/1/2009

$

210,000

9/1/2009

$

220,000

$

225,000

9/1/2009

$

238,500

9/1/2009

$

247,500

9/1/2009

$

260,000

9/1/2009

$

337,500

9/1/2009

$

365,000

9/1/2009

$

450,000

8/31/2009

$

465,000

3/1/2009

8/1/2009

$

1,625,000

Holland

Holland Public Schools - Jefferson K-7

Holland

Holland Public Schools - Jefferson K-7

Holland Public Schools - West K-7

Improve wiring for technology in classrooms, including wiring for projectors, document cameras, sound enhancement, interactive white boards and other smart classroom devices - West K-7 6/1/2009

Holland Public Schools - East K-7

Improve wiring for technology in classrooms, including wiring for projectors, document cameras, sound enhancement, interactive white boards and other smart classroom devices - East K-7 6/1/2009

Holland Public Schools - Heights K-7

Improve wiring for technology in classrooms, including wiring for projectors, document cameras, sound enhancement, interactive white boards and other smart classroom devices - Heights K-7 6/1/2009

Holland

Holland

Holland

Holland Public Schools - High School

Holland

Holland Public Schools - West K-7

T O

-N

Implement virtual desktop computer system District wide which will allows the re-use of existing computers and provides access to students and staff' to facilitate additional learning opportunities (after hours access of data and programs) - District Virtual Desktop 5/1/2009 Improve security and reduce operational costs though installation of a new phone system District wide - District Phones 6/1/2009

9/1/2009

O R

P P A

Improve wiring for technology in classrooms, including wiring for projectors, document cameras, sound enhancement, interactive white boards and other smart classroom devices - High School 6/1/2009 Upgrade and/or replace playground equipment to meet mandatory safety standards for K-7 building - West K-7 6/1/2009

s t s

Funding Request

6/1/2009

Improve wiring for technology in classrooms, including wiring for projectors, document cameras, sound enhancement, interactive white boards and other smart classroom devices - Jefferson K-7 6/1/2009 Upgrade and/or replace playground equipment to meet mandatory safety standards for K-7 building - Jefferson K-7 6/1/2009

Holland

Expected Completion Date

D VE

Holland

Holland Public Schools - District Virtual Desktop

Holland

Holland Public Schools - District Phones

Holland

6/15/2009

8/25/2009

$

35,000

Holland

Holland Public Schools - District wide install safe and student appropriate furniture District wide - District wide Black River Public School-Construction of new Creation of new storage building on campus necessary due to kindergarten storage building renovation. Black River Public School-Kindergarten Renovation of existing building to allow school to adapt to new state funding Renovation regulations and offer recommended full-day kindergarten.

6/15/2009

8/25/2009

$

215,000

Holland

Creation of new science labs to accommodate our many Advanced Placement Black River Public School-Science Laboratory offerings. These will allow our students to do many of the recommended activities Construction that we do not currently have the facilities to perform.

6/15/2009

Holland

d e tt

e u

q e R

t i m

8/25/2009

$

400,000

West Ottawa Public Schools - North Holland Elementary

This project seeks to repaint the interior walls, trim and metal ceilings at North Holland Elementary. The building was last painted in the early 1990's. The paint is showing its age with wear marks and dirt. The project is on the district's capital project list for consideration. 6/1/2009

9/1/2009

$

70,000

Holland Township

West Ottawa Public Schools - Woodside Elementary

This project seeks to repaint the interior walls, trim and metal ceilings at Woodside Elementary. The building was last painted in the early 1990's. The paint is showing its age with wear marks and dirt. The project is on the district's capital project list for consideration. 6/1/2009

9/1/2009

$

110,000

Holland Township

West Ottawa Public Schools - North Holland Elementary

This project seeks to replace the carpet at North Holland Elementary installed in the early 1990's. The carpet is worn and is difficult to keep clean and odor free. The project is on the district's capital project list for consideration pending future funding.

9/1/2009

$

160,000

b u S

Holland Township

02262009

Submitted Requests - Not Approved

6/1/2009

Route (Infrastructure Only)

714 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

West Ottawa Public School District

West Ottawa Public School District

Holland Township

Holland Township

Project Name

Project Description

Start Date

West Ottawa Public Schools - Woodside Elementary

This project seeks to replace the carpet at Woodside Elementary installed in the early 1990's. The carpet is worn and is difficult to keep clean and odor free. The project is on the district's capital project list for consideration pending future funding. 6/1/2009

West Ottawa Public Schools - North Holland Elementary

This project seeks to replace the current EDPM roof installed in 1991 with a portion added in 1997 with a white reflective PVC roof. The roof is currently in poor condition and the benefits of a white reflective Energy Star roof would help reduce building energy costs and provide an improved learning environment for students. The life expectancy for the new roof would be 15 to 20 years. 6/1/2009

Holland Township

West Ottawa Public Schools - Harbor Lights Middle School

Holly Academy

Holly / Holly Twp.

Holly Academy

Benzie County Central Schools

Replace air handlers, upgrade restrooms, add DDC, replace plumbing lines in tunnels install a/c in computer room, install computerized bldg mgt system, replace domestic water heater, replace domestic water piping and replace unit ventilators. 7/1/2009

Houghton-Portage Township Schools

Houghton

Houghton-Portage Township Schools

Hudson Area Schools Hudson

Hudson Area Schools Athletic Department

Hudson Area Schools Hudson

Hudson Area Schools, Elementary Level

Hudson Area Schools Hudson

Hudson Area Schools, Elementary Level

Hudson Area Schools Hudson

Hudson Area Schools, Middle and High School Level

Hudson Area Schools Hudson Hudson Area Schools Hudson

Hudson Area Schools Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District

Hudson Ishpeming Ishpeming Ishpeming Ishpeming

02262009

tt i m

d e t

Hudson Area Schools, Middle and High School Level

b u S

Hudson Area Schools, Elementary Level

T O

s t s

9/1/2009

-N

erecting, furnishing and equipping an addition to the middle and high school; remodeling, furnishing and refurnishing, and equipping and re-equipping existing school facilities; acquiring and installing educational technology in school buildings; and developing and improving athletic facilities, play fields and sites. Resurface track;Replace football field lights and poles; remodel weight room; locker rooms at football field

e u

Funding Request

$

170,000

$

190,000

12/1/2009

$

590,000

8/1/2010

$

950,000

12/31/2009

$

211,500

$

12,295,000

O R

P P A

West Ottawa Public School District

This project seeks to replace the current EDPM roof installed in 1992 with a white reflective PVC roof. The roof is currently in poor condition and the benefits of a white reflective Energy Star roof would help reduce building energy costs, especially the air cooling costs, and provide an improved learning environment for students. The life expectancy for the new roof would be 15 to 20 years. 6/1/2009 Renovation of Dormitory #1 into office space and classroom space with emphasis on reduction of energy and utility consumption 7/15/2009

Benzie County Central Schools Honor, MI

Expected Completion Date

9/1/2009

D VE

6/1/2009

10/30/2009

$

400,800

Driveway ingress/egress

6/1/2009

10/30/2009

$

150,000

Boiler and hot water heat piping replacement

6/1/2009

10/30/2009

$

168,000

Replace middle school gym bleachers;storage building;ingress and egress changes for safety and traffic flow;air conditioning;bandroom storage;track resurface

6/1/2009

10/30/2009

$

288,000

8/30/2009

$

432,800

8/30/2009

$

364,780

6/1/2009

8/30/2009

$

735,800

6/1/2009

6/1/2009

$

25,000

6/1/2009

8/1/2009

$

75,000

7/1/2009

9/1/2009

$

100,000

7/1/2009

9/1/2009

$

150,000

q e R

Enclose courtyards for usable instructional space; ashphalt driveways, parking lots and sidewalks; remodel middle school locker rooms; remodel bathrooms; air handling system in high school gym; new PA and bell system; band storage; remodel two remaining connected classrooms; replace original 1957 lockers; replace original 1957 gates 6/1/2009 Replace Gym floor; asphalt/resurface/line parking lot; storage building;roof replacement;air conditioning 6/1/2009

Repair retaining wall;expand/upgrade kitchen;additional keyless entries; storage Hudson Area Schools, District Level building; asphalt/resurface driveways;district wide technology upgrade Ishpeming School District - C.L. Phelps Middle School Replace gymnasium lights (high efficiency) Ishpeming School District - C.L. Phelps Middle School Replace classroom/hall lights(high efficiency) Ishpeming School District - Athletic Facilities Complex Wind turbine and solar panels for generation of electricity Ishpeming School District - Birchview Elementary Wind turbine for generation of electricity

Submitted Requests - Not Approved

Route (Infrastructure Only)

715 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Ishpeming Public School District Northwest Community Schools

Location City or Township

Ishpeming

Project Name Project Description Ishpeming School District - Ishpeming High Construct high efficiency cafeteria that serves multiple schools and utilizes solar School power. Ishpeming School District - Birchview Construct 6 classrooms, restrooms, cafeteria, library-computer center, high efficiency Elementary heating; solar panels for electricity Ishpeming School District - Ishpeming High School Domestic hot water boiler Ishpeming School District - Birchview Elementary Univent /fintube replacement in existing rooms Ishpeming School District - Birchview Elementary Replace rubber roof membrane/insulation Ishpeming School District - C.L. Phelps Middle School Replace rubber roof membrane/insulation Ishpeming School District - Birchview Elementary Replace existing exterior doors with energy efficient doors Ishpeming School District - Ishpeming High School Replace rubber roof membrane /insulation over library/classrooms Ishpeming School District - Ishpeming High School Replace Technology Center/Fine Arts Center roof/roof deck Ishpeming School District - Athletic Facilities Complex Construct locker room building with alternative energy source Ishpeming School District - Birchview Elementary Construct 2 existing classroom separation walls Ishpeming School District - Birchview Elementary ADA compliance (doors, fountains, door hardware) Ishpeming School District - C.L. Phelps Middle School Supervised fire alarm system with fire suppression Ishpeming School District - Ishpeming High School Expanded security surveillance cameras/recording devices Ishpeming School District - Birchview Elementary Audible alarm system Ishpeming School District - C.L. Phelps Middle School Audible alarm system Ishpeming School District - Ishpeming High School Audible alarm system Ishpeming School District - Birchview Elementary Fiber optic broadband connection at 20MB Ishpeming School District - Ishpeming High School Electronic door access Ishpeming School District - C.L. Phelps Middle School Fiber optic broadband hardware including routers, hubs, wireless access Ishpeming School District - Ishpeming High School Fiber optic broadband hardware including routers, hubs, wireless access Ishpeming School District - Birchview Security improvements including remote surveillance cameras, recording devices, Elementary electronic access control Ishpeming School District - Ishpeming High School Rebuild front entry/handicapped entry (masonry, concrete) Ishpeming School District - Ishpeming High School Replace gymnasium floor Ishpeming School District - Ishpeming High School Tuck point/seal exterior masonry Ishpeming School District - Athletic Facilities Complex Reconstruct 8 tennis courts (concrete, asphalt, posts)

Jackson

Northwest

Ishpeming Ishpeming Ishpeming Ishpeming Ishpeming Ishpeming Ishpeming

Ishpeming Ishpeming Ishpeming Ishpeming Ishpeming

Ishpeming

eq

Ishpeming Ishpeming Ishpeming Ishpeming

m b u

Ishpeming Ishpeming

Ishpeming

02262009

S

R d

e t t

it

Ishpeming

Ishpeming

st

e u

Ishpeming

s

O N

Boiler replacement in 4 buildings-including

Submitted Requests - Not Approved

Funding Request

7/1/2009

7/1/2010

$

950,000

7/1/2009

7/1/2010

$

10,075,000

4/1/2009

6/1/2009

$

35,000

6/1/2009

9/1/2009

$

95,000

$

150,000

5/1/2009

$

150,000

6/1/2009

$

250,000

4/1/2009

8/1/2009

$

325,000

4/1/2009

10/1/2009

$

350,000

4/1/2009

9/1/2009

$

750,000

6/1/2009

7/1/2009

$

25,000

6/1/2009

7/1/2009

$

100,000

6/1/2009

8/1/2009

$

250,000

4/1/2009

6/1/2009

$

6,260

4/1/2009

6/1/2009

$

12,600

4/1/2009

4/1/2009

$

12,600

4/1/2009

4/1/2009

$

12,600

4/1/2009

4/1/2009

$

16,500

4/1/2009

6/1/2009

$

22,095

4/1/2009

4/1/2009

$

25,000

4/1/2009

4/1/2009

$

25,000

4/1/2009

7/1/2009

$

25,000

4/1/2009

4/1/2009

$

50,000

5/1/2009

6/1/2009

$

100,000

4/1/2009

6/1/2009

$

250,000

5/1/2009

8/1/2009

$

350,000

$

750,000

O R

4/1/2009 4/1/2009

PP

5/1/2009

A T

Ishpeming

Ishpeming

Start Date

Expected Completion Date

5/1/2009

D VE

Route (Infrastructure Only)

716 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Jackson

JPS Jackson High

Teen Health Center

6/1/2009

12/31/2009

$

200,000

Jackson

JPS Hurst Planetarium

Roof replacement

6/1/2009

9/30/2009

$

8,917

Jackson

JPS Sharp Park Elementary

Roof replacement

6/1/2009

9/30/2009

$

37,080

Jackson

JPS McCulloch Elementary

Roof replacement

6/1/2009

9/30/2009

$

46,350

Jackson

JPS Tomlinson High

Raze annex building

51/2009

$

51,500

Jackson

JPS Sharp Park Elementary

Replace classroom ceilings

6/1/2009

12/31/2009

$

55,620

Jackson

JPS McCulloch Elementary

Replace classroom ceilings

6/1/2009

12/31/2009

$

57,000

Jackson

JPS Firth Alternative Middle School

Replace classroom ceilings

6/1/2009

12/31/2009

$

61,182

Jackson

JPS Cascades Elementary

Replace classroom ceilings

6/1/2009

12/31/2009

$

63,036

Jackson

JPS Bennett Elementary

Replace classroom ceilings

6/1/2009

12/31/2009

$

86,211

Jackson

JPS TA Wilson Academy

Roof replacement

6/1/2009

9/30/2009

$

91,138

Jackson

JPS Bennett Elementary

Roof replacement

6/1/2009

9/30/2009

$

120,793

Jackson

JPS Cascades Elementary

Roof replacement

6/1/2009

9/30/2009

$

157,590

Jackson

JPS Frost Elementary

Roof replacement

5/1/2009

9/30/2009

$

167,787

Jackson

JPS Hunt Elementary

Replace classroom ceilings

6/1/2009

12/31/2009

$

227,000

Jackson

JPS Northeast Elementary

Replace classroom ceilings

6/1/2009

12/31/2009

$

241,020

Jackson

JPS Jackson High

Roof replacement

6/1/2009

9/30/2009

$

250,171

Jackson

JPS Firth Alternative Middle School

Roof replacement

6/1/2009

9/30/2009

$

257,448

Jackson

JPS District-wide

Replace school buses

4/1/2009

8/31/2009

$

500,000

Jackson

JPS Hunt Elementary

Roof replacement

6/1/2009

9/30/2009

$

544,251

JPS Middle School at Parkside

Roof replacement

6/1/2009

9/30/2009

$

1,372,588

JPS Hurst Planetarium

Replace asbestos flooring

6/1/2009

11/30/2009

$

7,601

JPS Bennett Elementary

Replace chalk boards

6/1/2009

9/30/2009

$

9,270

JPS Sharp Park Elementary

Replace asbestos flooring

6/1/2009

11/30/2009

$

25,956

JPS McCulloch Elementary

Replace asbestos flooring

6/1/2009

11/30/2009

$

32,445

Jackson

JPS Bennett Elementary

Replace asbestos flooring

6/1/2009

11/30/2009

$

38,007

Jackson

JPS Firth Alternative Middle School

Replace asbestos flooring

6/1/2009

11/30/2009

$

58,401

m b u

Jackson Jackson Jackson Jackson Jackson

02262009

S

eq

s

st

e u

O N

R d

e t t

it

A T

Submitted Requests - Not Approved

PP

O R 6/30/2009

D VE

Route (Infrastructure Only)

717 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools

Jonesville Community Schools Kalkaska Public Schools Kalkaska Public Schools Kalkaska Public Schools Kalkaska Public Schools Kalkaska Public Schools Kentwood Public Schools

Kentwood Public Schools

Kentwood Public Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Jackson

JPS Hunt Elementary

Replace chalk boards

6/1/2009

9/30/2009

$

84,460

Jackson

JPS Jackson High

Replace concrete deck over locker room

6/1/2009

6/30/2009

$

88,065

Jackson

JPS Frost Elementary

Replace chalk boards

6/1/2009

9/30/2009

$

92,700

Jackson

JPS Northeast Elementary

Replace chalk boards

6/1/2009

9/30/2009

$

92,700

Jackson

JPS Hunt Elementary

Replace asbestos flooring

6/1/2009

$

94,554

Jackson

JPS Northeast Elementary

Replace asbestos flooring

6/1/2009

11/30/2009

$

94,554

Jackson

JPS Frost Elementary

Replace asbestos flooring

6/1/2009

11/30/2009

$

166,860

Jackson

JPS Middle School at Parkside

Replace asbestos flooring

6/1/2009

11/30/2009

$

245,655

Jackson

JPS District-wide

Paint interior and exterior

5/1/2009

12/31/2009

$

846,200

Jonesville

Jonesville Community Schools

partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; erecting, furnishing and equipping a classroom addition to Williams Elementary School and improving and relocating the playground, if necessary, to accommodate the addition; acquiring, installing and equipping educational technology equipping and improving athletic fields; acquiring school busses; and developing and improving sites.

$

7,175,000

Kalkaska

Cherry Street Intermediate

Improvements and remodeling of existing structure

Kalkaska Kalkaska

Kalkaska Middle School Kalkaska Public Schools- Birch Street Elementary

Kalkaska

Kalkaska High School

Kalkaska

Kalkaska High School

A T

s

st

PP

O R 11/30/2009

D VE

O N

June, 2009

August, 2010

$

1,262,000

Improvements and remodeling of existing structure

June, 2009

August, 2010

$

3,200,000

Improvements and remodeling of existing structure

June, 2009

August, 2010

$

4,371,000

Auditorium

June, 2009

August, 2010

$

4,500,000

Improvements and remodeling of existing structure

June, 2009

August, 2010

$

5,216,070

Replacement of three (3) gas fired boilers with high efficient reciprocating boilers, including all pumps, fans and motors. Complete mechanical upgrade design to increase efficiency.

9/1/2009

1/1/2010

$

1,300,000

Electrical Energy Efficiency. Install indirect lighting fixture w/energy efficient ballast. Replace all high wattage gym lighting, media centers and common space w/energy efficient fixtures. Replace all exterior lighting with LED fixtures to increase efficiency. 6/1/2009

1/1/2010

$

1,500,000

Kentwood - EKHS

Renovation of existing parking lot area to include new sidewalks for pedestrians to all buildings on campus. Parking area to include bus drop off area specifically to meet al the current ADA Codes. All parking lot lighting changed to more energy efficient lighting and controlled by building management system. Upgrades to storm water drainage according to state and local ordinance. 6/1/2009

9/1/2009

$

1,800,000

Breitung Twp Schools

Replace auditorium stage lighting

2009

2009

$

1,200

Kingsford

Breitung Twp Schools

Replace gym lighting in high school

2009

2009

$

15,000

Kingsford

Breitung Twp Schools

Replace gym lighting in middle school

2009

2009

$

18,900

Kingsford

Breitung Twp Schools

Classroom carpet replacement

2009

2009

$

75,000

Kentwood

Kentwood

Kentwood Kingsford

02262009

i m

Kentwood - District wide

b u S

R d

e t tt

Kentwood - EKHS

eq

e u

Submitted Requests - Not Approved

Route (Infrastructure Only)

718 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Breitung Township Schools Benzie County Central Schools

Public Schools Of Calumet Lake Linden-Hubbell School District Lake Linden-Hubbell School District

Lake Linden-Hubbell School District Lakewood Public Schools Lakewood Public Schools Lakeview Community Schools (Montcalm)

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Kingsford

Breitung Twp Schools

3 new energy-efficient boilers

2009

2009

$

126,000

Kingsford

Breitung Twp Schools

Middle School stair tread replacement (2)

2009

2009

$

5,600

Kingsford

Breitung Twp Schools

Parking lot crack filling and striping

2009

2009

$

8,000

Kingsford

Breitung Twp Schools

High school stain tread replacement (3)

2009

2009

$

8,400

Kingsford

Breitung Twp Schools

Replace 15 bathroom stalls in 3 bathrooms

2009

$

13,200

Kingsford

Breitung Twp Schools

Parking lot crack filling and striping

2009

2009

$

13,500

Kingsford

Breitung Twp Schools

High school carpet repleacement in library and guidance office = 2,900 square feet

2009

2009

$

13,800

Kingsford

Breitung Twp Schools

Replace gym lighting

2009

2009

$

16,500

Kingsford

Breitung Twp Schools

Carpet replacement in office & central office

2009

2009

$

36,000

Kingsford

Breitung Twp Schools

Middle school carpet replacement in hallways = 10,520 square feet

2009

2009

$

49,444

Kingsford

Breitung Twp Schools

Middle school carpet replacement in library & office = 12,100 square feet

2009

2009

$

56,870

Kingsford

Breitung Twp Schools

High school carpet replacement in 24 rooms = 21,600 square feet

2009

2009

$

101,000

Kingsford

Breitung Twp Schools

Middle school carpet replacement 26 rooms = 23,400 square feet

2009

2009

$

109,980

Kingsford

Breitung Twp Schools

Upgrade security camera system

2009

2009

$

8,500

Kingsford

Breitung Twp Schools

Replace P.A. system in the middle school

2009

2009

$

17,000

Kingsford

Breitung Twp Schools

2009

2009

$

23,500

Lake Ann, MI

Benzie County Central Schools

Replace classroom televisions (94) Add Bldg mgt system, replace pumps, upgrade temp control, replace unit ventilator, install separate boiler.

7/1/2009

12/31/2009

$

59,500

$

3,500,000

Lake Linden Lake Linden

st

e u

eq

s

A T

O N

R d

e t tt

Lake Linden-Hubbell School District Lake Linden Hubbell Schools Tech Ed Building

i m

PP

O R 2009

partially remodeling, furnishing and refurnishing, equipping and re-equipping the high school and elementary school; constructing, equipping, developing and improving athletic/physical education facilities, in part for a new running track, play fields and playgrounds; and developing and improving the sites.

D VE

Lake Linden Hubbell Schools Bus Garage

Add enclosed entry to an existing tech ed building. Add additional space to existing bus garage to allow for adequate room for bus storage and maintenance.

Lake Linden

Lake Linden Hubbell Schools High School

Replace glass block in auditorium with thermally broke windows for energy savings. Replace existing boilers with high efficiency boilers. Provide cooling to computer lab and server rooms to provide climate control for longer equipment life.

4/1/2009

9/1/2009

$

200,000

Lake Odessa

Lakewood Transportation

GPS communication devices

3/1/2009

3/30/2009

$

60,000

Lake Odessa

Lakewood Technology

Update computers for staff & students at all locations

6/1/2009

9/1/2009

Lakeview

Lakeview-Lakeview Elementary

Energy efficiencies & safety: New Windows. Safety Fencing. Lock Down Button. Exterior Door fronts. Carpet throughout building.

7/1/2009

1/1/2010

$

125,000

b u S

Lake Linden

02262009

Submitted Requests - Not Approved

4/1/2009

9/1/2009

$

10,000

4/1/2009

9/1/2009

$

180,000

Route (Infrastructure Only)

719 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Lakeview Community Schools (Montcalm)

Lakeview

Project Name

Project Description

Start Date

Lakeview-Lakeview Middle School

Energy efficiencies & Safety: New Boiler- to replace old steam boiler. Alarm System. Lock Down button. 7/1/2009

1/1/2010

7/1/2009

1/1/2010

1/1/2010

Lakeview Community Schools (Montcalm)

Lakeview

Lakeview- Central Office

Safety, Energy Efficiencies, and Secure Storage for record retention: Fob entry system- Handicap accessible. Addition for secure storage of records & for Professional Development and community meetings.

Lakeview Community Schools (Montcalm)

Lakeview

Lakeview-High School

Energy efficiencies & Safety: New Windows, Upgrade heating controls. Safety fencing. Lockers. Exterior Door Fronts

7/1/2009

Lakeview

Lakeview-District Wide

Energy Efficiencies & Safety: Upgrade parking lots-paving. Electrical Upgrades. Sidewalk with lighting used for kids walking to school. Traffic rerouting for safe pick up/drop off points.

7/1/2009

Lakeview Lawrence

Lakeview-Bright Start Elementary Conference Center

Leland Township

Leland Public School

Safety: Enclose playground with fencing. Construct a sidewalk between Bright Start & the High School for safety. 7/1/2009 New energy efficient lighting, boiler and equipmen 6/1/2009 Replace old doors and windows in 1950's wing of school to reduce heat loss thus saving money. 5/1/2009

Lennon

Durand Area Schools/Doyle Knight Elementary School

Complete building entrance and window replacement, HVAC and lighting improvements. Improvements to entrances, windows, HVAC and lighting will create a more productive learning environment as well as improve energy efficiency. Sustainability/green design will be utilized in the project. 6/9/2009

Lincoln Park

Lincoln Park Public Schools Warehouse

Add 100' addition with car wash bay.

Lincoln Park

Lincoln Park Public Schools Lafayette

Install new concrete around building

Lincoln Park

Lincoln Park Public Schools Hoover

Lincoln Park

Lakeview Community Schools (Montcalm) Lakeview Community Schools (Montcalm) Van Buren ISD Leland Public School District

Durand Area Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools

Expected Completion Date

Funding Request

$

134,000

D VE $

231,000

$

268,000

1/1/2010

$

551,000

9/1/2009 8/1/2009

$ $

76,000 150,000

7/1/2009

$

82,200

12/10/2009

$

1,542,587

6/18/2009

December '09

$

480,000

6/18/2009

August '09

$

6,000

Remove/Replace 3-Way heating valve

6/18/2009

August '09

$

6,000

Lincoln Park Public Schools Paun

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

10,000

Lincoln Park

Lincoln Park Public Schools Hoover

Replace Steam Converter

6/18/2009

August '09

$

12,000

Lincoln Park

Lincoln Park Public Schools LeBlanc

Replace Steam Converter

6/18/2009

August '09

$

12,000

Lincoln Park

Lincoln Park Public Schools Carr

Install New Heating Control Valves

6/18/2009

August '09

$

20,000

Lincoln Park

Lincoln Park Public Schools Paun

Replace all heating control valves.

6/18/2009

August '09

$

20,000

Lincoln Park

Lincoln Park Public Schools High School

Replace plumbing in Girls/Boys locker rooms

6/18/2009

August '09

$

24,000

Lincoln Park Public Schools Middle School

Repair/replace rooftop units

6/18/2009

August '09

$

25,000

Lincoln ParkHigh School

Replace water cooled condensers in Café Coolers

6/18/2009

August '09

$

33,600

High School

Replace water cooled condensers in Café Coolers

6/18/2009

August '09

$

33,600

Lincoln Park Public Schools Keppen

Remove and replace all heating control valves

6/18/2009

August '09

$

34,000

Lincoln Park

Lincoln Park Public Schools Foote

Upgrade Heating system pumps and valves

6/18/2009

August '09

$

34,000

Lincoln Park

Lincoln Park Public Schools Crowley

Install Lighting Occupancy Sensors

6/18/2009

August '09

$

39,500

Lincoln Park

Lincoln Park Public Schools LeBlanc

Install Occupancy Lighting Sensors

6/18/2009

August '09

$

44,000

m b u

Lincoln Park Lincoln Park

S

Lincoln Park Lincoln Park

02262009

s t s

-N

e u

eq

R d

e t t

it

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

720 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Lincoln Park

Lincoln Park Public Schools Crowley

Install Energy Management System

6/18/2009

August '09

$

46,450

Lincoln Park

Lincoln Park Public Schools Mixter

Install Occupancy lighting sensors

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools LeBlanc

Install Energy Management System

6/18/2009

August '09

$

51,500

Lincoln Park

Lincoln Park Public Schools Foote

Install Lighting Occupancy Sensors

6/18/2009

August '09

$

51,500

Lincoln Park

Lincoln Park Public Schools Carr

Install Lighting Occupancy Sensors

6/18/2009

$

56,400

Lincoln Park

Lincoln Park Public Schools Mixter

Install energy management system

6/18/2009

$

59,000

Lincoln Park

Lincoln Park Public Schools Paun

Install energy management system

6/18/2009

August '09

$

59,000

Lincoln Park

Lincoln Park Public Schools Foote

Install Energy Management System

PP

August '09

6/18/2009

August '09

$

60,500

Lincoln Park

Lincoln Park Public Schools Carr

Install Energy Management System

6/18/2009

August '09

$

66,400

Lincoln Park

Lincoln Park Public Schools Paun

Install Occupancy Lighting Sensors

6/18/2009

August '09

$

69,000

Lincoln Park

Lincoln Park Public Schools LeBlanc

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

70,000

Lincoln Park

Lincoln Park Public Schools Keppen

Install Energy Management System

6/18/2009

August '09

$

73,000

Lincoln Park

Lincoln Park Public Schools Carr

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

90,000

Lincoln Park

Lincoln Park Public Schools High School

Repair heating system valves and piping.

6/18/2009

August '09

$

100,000

Lincoln Park

Lincoln Park Public Schools Hoover

Install Occupancy lighting sensors.

6/18/2009

August '09

$

101,500

Lincoln Park

Lincoln Park Public Schools Hoover

Install Energy Management System

6/18/2009

August '09

$

119,500

Lincoln Park

Lincoln Park Public Schools Foote

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

120,000

Lincoln Park

Lincoln Park Public Schools Keppen

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

120,000

Lincoln Park

Lincoln Park Public Schools Mixter

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

120,000

Lincoln Park

Lincoln Park Public Schools Hoover

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets

6/18/2009

August '09

$

130,000

Lincoln Park Public Schools Hamilton

Improve Storm Water Management through Pervious Paved Parking Lot

6/18/2009

August '09

$

150,000

Lincoln Park Public Schools Middle School

Replace second floor carpeting Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale

6/18/2009

August '09

$

197,000

6/18/2009

August '09

$

231,000

6/18/2009

August '09

$

232,000

6/18/2009

August '09

$

265,000

m b u

Lincoln Park Lincoln Park

S

Lincoln Park Lincoln Park

O N

R d

e t t

it

s

st

e u

eq

A T

Lincoln Park Public Schools LeBlanc

Lincoln Park

Lincoln Park Public Schools Mixter

Remove/replace heating lines to overhead Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale

Lincoln Park

Lincoln Park Public Schools Middle School

Install Occupancy Lighting Sensors

6/18/2009

August '09

$

270,000

Lincoln Park Public Schools Crowley

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

$

280,500

Lincoln Park

02262009

Lincoln Park Public Schools Paun

O R August '09

D VE

Submitted Requests - Not Approved

Route (Infrastructure Only)

721 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools

Location City or Township Lincoln Park

Lincoln Park Public Schools Carr

Lincoln Park

Lincoln Park Public Schools Paun

Project Description Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale

Lincoln Park

Lincoln Park Public Schools High School

Install A/C to library and head end rooms

6/18/2009

August '09

Lincoln Park

Lincoln Park Public Schools High School

6/18/2009

August '09

Lincoln Park

Lincoln Park Public Schools Keppen

Renovate Toilet Rooms with Waterless Urinals and Automatic Sensor Faucets Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale

6/18/2009

Lincoln Park

Lincoln Park Public Schools LeBlanc

Replace Boiler with 2 High Efficiency Boiler

6/18/2009

Lincoln Park Public Schools Mixter

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

$

400,000

Lincoln Park Public Schools Carr

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

$

445,000

Lincoln Park

Lincoln Park

Project Name

Funding Request

6/18/2009

August '09

$

300,000

6/18/2009

August '09

$

310,000

$

320,000

$

330,000

$

330,000

August '09

$

378,000

P P A

O R August '09

D VE

Lincoln Park

Lincoln Park Public Schools Foote

Lincoln Park

Lincoln Park Public Schools Hoover

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes. Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale

Lincoln Park

Lincoln Park Public Schools Keppen

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

Lincoln Park

Lincoln Park Public Schools High School

Install Lighting Occupancy Sensors

6/18/2009

August '09

$

569,500

Lincoln Park

Lincoln Park Public Schools Paun

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

$

632,000

Lincoln Park

Lincoln Park Public Schools High School

Install Energy Management System

6/18/2009

August '09

$

670,000

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

$

711,500

Improved Daylight Factor and Thermal Performance with New Windows with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes 6/18/2009

August '09

$

894,000

Lincoln Park Public Schools

Lincoln Park

Lincoln Park Public Schools LeBlanc

Lincoln Park Public Schools

Lincoln Park

Lincoln Park Public Schools Hoover

Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools

T O

Start Date

Expected Completion Date

d e tt

t i m

s t s

-N

e u

q e R

6/18/2009

August '09

$

483,500

6/18/2009

August '09

$

537,408

6/18/2009

August '09

$

561,500

6/18/2009

August '09

$

1,800,000

Lincoln Park Public Schools High School

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes. Replace Roof with Added Insulation and Energy Star Single Ply Membrane Control/Divert Storm Water to Rain Garden or Bio Swale

6/18/2009

August '09

$

3,015,000

Lincoln Park Public Schools Carr

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park Public Schools Crowley

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools Foote

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools Hoover

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools Keppen

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools High School

ub

Lincoln Park

S

Lincoln Park Lincoln Park

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

722 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Lincoln Park Public Schools Linden Community Schools Linden Community Schools Linden Community Schools

Linden Community Schools

Linden Community Schools Linden Community Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Lincoln Park

Lincoln Park Public Schools Lafayette

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools LeBlanc

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools Paun

Install Video Surveillance System

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools Middle School

Repair roofing.

6/18/2009

August '09

$

50,000

Lincoln Park

Lincoln Park Public Schools Hoover

Tuck Point and Clean entire building.

6/18/2009

$

60,000

Lincoln Park

Lincoln Park Public Schools Crowley

Reroute Water Main from underneath building.

6/18/2009

$

75,000

Lincoln Park

Lincoln Park Public Schools Paun

Remove/replace electrical wiring and panels.

6/18/2009

August '09

$

90,000

Lincoln Park

Lincoln Park Public Schools LeBlanc

Remove/Replace Asbestos Tile

PP

August '09

6/18/2009

August '09

$

93,000

Lincoln Park

Lincoln Park Public Schools Middle School

Repair interior masonry cracks

6/18/2009

August '09

$

100,000

Lincoln Park

Lincoln Park Public Schools Paun

Remove/replace asbestos tile

6/18/2009

August '09

$

129,000

Lincoln Park

Lincoln Park Public Schools High School

6/18/2009

August '09

$

400,000

Lincoln Park

Lincoln Park Public Schools Foote

Install Video Surveillance System Remove Asbestos Ceiling - Install Drop Ceiling (lights, fire alarm, exhaust fans, technology infrastructure, clocks, etc.)

6/18/2009

August '09

$

763,000

Lincoln Park

Lincoln Park Public Schools Mixter

Remove Asbestos ceiling tile

6/18/2009

August '09

$

825,000

Lincoln Park

Lincoln Park Public Schools High School

Replace all hallway lockers

6/18/2009

August '09

$

150,000

Lincoln Park

Lincoln Park Public Schools Carr

Replace Electrical Panels and Distribution Wiring

6/18/2009

August '09

$

150,000

Lincoln Park

Lincoln Park Public Schools Keppen

Tuck Point and Clean entire building.

6/18/2009

August '09

$

175,000

Lincoln Park

Lincoln Park Public Schools Middle School

Install Video Surveillance System

6/18/2009

August '09

$

200,000

Lincoln Park

Lincoln Park Public Schools High School

Remove/replace asbestos tile in all hallways

6/18/2009

August '09

$

200,000

Linden

Argentine Elementary

Exterior Building Improvements

ASAP

Summer 2009

$

11,200

Linden

Argentine Elementary

Water Filtration installation

ASAP

Summer 2009

$

22,400

Office A/C Condenser Replaced

m b u

Linden

Linden

Linden Linden

02262009

High School

S

O N

R d

e t t

it

s

st

e u

eq

A T

O R August '09

D VE

ASAP

Summer 2009

$

28,000

Linden High School

Provide six file servers to store our high school students work over their four year high school career. Currently we have to delete their work after every school year as we do not have the space. Additional space would allow our students to have electronic portfolio's. ASAP

Summer 2009

$

30,000

Linden High School, Linden Middle School, Argentine Elementary, Central Elementary, Linden Elementary, Hyatt Elementary

Provide the switches that we need to support the technology for our students. We would need (10) switches to make sure we have the infrastructure to support our students to continue with their technology experiences.

ASAP

Summer 2009

$

40,000

Hyatt Elementary

Media Center Rooftop Unit Replaced

ASAP

Summer 2009

$

51,520

Submitted Requests - Not Approved

Route (Infrastructure Only)

723 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Linden Community Schools

Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools

Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools

Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Linden

Argentine Elementary

Provide our students with ceiling mounted projectors. We all live in a visual world, especially our students, with bigger pictures projected we will be able to capture the students attention better, and provide them with a better learning environment. This would be for 20 classrooms.

ASAP

Summer 2009

$

54,000

Linden

Central Elementary, Linden Elementary, Argentine Elementary, Linden High School

Provide our students with the intervention software Reading Plus. We currently have this software at two buildings and have data to show that our students are making gains in their comprension, fluency, and vocabulary. ASAP

Summer 2009

$

64,300

Linden

High School

Provide 100 desktop computers to give our students and staff more access

ASAP

Summer 2009

$

100,000

Linden

Central Elementary

Window Replacement

ASAP

$

100,800

Linden

Argentine Elementary

Multi Zone AHU Replaced

ASAP

Summer 2009

$

103,040

Linden

Hyatt Elementary

3-HE North AHU's Replaced

PP

Summer 2009

ASAP

Summer 2009

$

132,720

Linden

Hyatt Elementary

Window Replacement

ASAP

Summer 2009

$

143,750

Linden

Hyatt Elementary

Multi Zone AHU & Condenser Replacement

ASAP

Summer 2009

$

148,960

Linden

Argentine Elementary

Boiler Replacement Heating & Domestic

ASAP

Summer 2009

$

175,000

Linden

Linden Elementary

Summer 2009

$

184,800

Linden

Linden High School

Boiler Replacement Heating & Domestic ASAP Provide our High School Graphic Arts and Video Production students with (55) Mac's to allow them to experience the real world applications ASAP

Summer 2009

$

220,000

Linden

Linden-High School, Argentine Elementary, Provide wireless access for our students at Linden Community Schools. This will Central Elementary, Linden Elementary, Hyatt allow our students more access to technology and get us ready to provide our Elementary students with 21st Century skills, in all areas of our school buildings.

ASAP

Summer 2009

$

228,583

ASAP

Summer 2009

$

252,000

Linden

st

e u

eq

s

A T

O N

O R

D VE

Boiler Replacement Heating & Domestic

Linden

Hyatt Elementary Central Elementary, Linden Elementary, Linden High School, Hyatt Elementary

Provide our students with laptops (180) to give them more access to technology.

ASAP

Summer 2009

$

252,000

Linden

High School

Boiler Replacement Heating & Domestic

ASAP

Summer 2009

$

308,000

Linden

Central Elementary

Boiler Replacement Heating & Domestic

ASAP

Summer 2009

$

318,320

Linden

High School

Remodel Public Restrooms Throughout Building

it

e t t

R d

ASAP

Summer 2009

$

336,000

Linden High School, Linden Middle School, Argentine Elementary, Central Elementary, Linden Elementary, Hyatt Elementary

Provide our students with interactive white boards and sound amplification systems in every classroom. For a total of 168 classrooms. This will once again allow us to provide our students with 21st Century skills. Sound amplification for students is a must in today's world. ASAP

Summer 2009

$

637,560

Linden Elementary

2-LE Multi Zone AHU's Replaced

ASAP

Summer 2009

$

670,000

High School

13 HS Air Handlers Replaced

ASAP

Summer 2009

$

1,764,848

Linden

High School

Band Room Doorway Replacement

ASAP

Summer 2009

$

6,720

Linden

Linden Elementary

Special Ed Doorways Created

ASAP

Summer 2009

$

10,080

Linden

Hyatt Elementary

Hallway Door System Upgraded For Security Reasons

ASAP

Summer 2009

$

11,200

m b u

Linden Linden Linden

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

724 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools Linden Community Schools

Clarenceville School District

Location City or Township

Project Name

Project Description

Start Date

Funding Request

Linden

Middle School

Security Cameras Installed

ASAP

Summer 2009

$

16,800

Linden

High School

Security Cameras Installed

ASAP

Summer 2009

$

16,800

Linden

Argentine Elementary

Guardrail Installation To Improve Safety

ASAP

Summer 2009

$

20,000

Linden

High School

Trainer Rooms Upgrades

ASAP

Summer 2009

$

22,400

Linden

Argentine Elementary

Playground Improvements

ASAP

Summer 2009

$

39,200

Linden

Linden Elementary

Ceiling Tiles Replaced

ASAP

Summer 2009

$

43,008

Linden

High School

Office Renovations For Security Reasons

ASAP

Summer 2009

$

46,000

Linden

High School

Band Uniform Storage Improvements

ASAP

Summer 2009

$

56,000

Linden

District Wide

Summer 2009

$

84,000

Linden

Hyatt Elementary

Sign Installation Throughout District ASAP Gymnasium Improvements, Including Bleachers, backboards, lighting system, stage renovations ASAP

Summer 2009

$

89,700

Linden

Central Elementary

Ceiling Tiles Replaced

ASAP

Summer 2009

$

114,688

Linden

Linden Elementary

Classroom Storage Improvements

ASAP

Summer 2009

$

164,640

Linden

High School

Classroom Ceiling Tiles Replaced

ASAP

Summer 2009

$

168,000

Linden

Hyatt Elementary

Ceiling Tiles Replaced

ASAP

Summer 2009

$

196,000

Linden

Hyatt Elementary

Classroom Storage Improvements

ASAP

Summer 2009

$

217,350

Linden

High School

Classroom Storage Improvements

ASAP

Summer 2009

$

266,560

Linden

High School

Outdoor Locker Rooms

ASAP

Summer 2009

$

280,000

Linden

High School High School, Argentine Elementary, Central Elementary

Outside Home Side Bleacher Replacement

ASAP

Summer 2009

$

537,600

Asphalt Replacement

ASAP

Summer 2009

$

560,000

Provide automatic lighting controls with occupancy sensors to improve energy efficiency

March 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 2009 60 days after start

$

75,563

Provide automatic lighting controls with occupancy sensors to improve energy efficiency

March 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 2009 60 days after start

$

94,454

t i m

ub

Clarenceville School District - Clarenceville Botsford

Livonia

O N

R d

e t t

Linden

s

st

e u

eq

A T

S Clarenceville School District

Expected Completion Date

Livonia

02262009

Clarenceville School District - Clarenceville Middle School

Submitted Requests - Not Approved

PP

O R

D VE

Route (Infrastructure Only)

725 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clarenceville School District

Clarenceville School District

Clarenceville School District

Clarenceville School District

Clarenceville School District

Clarenceville School District Clarenceville School District Clarenceville School District Clarenceville School District Clarenceville School District Clarenceville School District Clarenceville School District

Project Name

Project Description

Clarenceville School District - Grandview Elementary

Livonia

Clarenceville School District - Clarenceville High School

Livonia

Clarenceville School District - Botsford Elementary

Livonia

Provide automatic lighting controls with occupancy sensors to improve energy efficiency

$

94,454

Provide automatic lighting controls with occupancy sensors to improve energy efficiency

March 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 2009 60 days after start

$

100,045

May 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 2009 60 days after start

$

141,178

May 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 2009 60 days after start

$

153,178

May 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 60-90 days after 2009 start

$

267,553

$

450,000

$

215,000

$

215,000

s

t s e

O N

Convert all outdated t-12 lighting to more energy efficient t-8 lighting

d e tt

t i m

Livonia

Livonia Livonia Livonia Livonia

02262009

Clarenceville School District - Clarenceville High School Clarenceville School District - Botsford Elementary Clarenceville School District - Grandview Elementary

ub

Livonia Livonia

e R

Clarenceville School District - Middle School

S

Clarenceville School District - Middle School Clarenceville School District - Clarenceville High School Clarenceville School District - Grandview Elementary Clarenceville School District - Botsford Elementary

O R

A T

qu

Livonia

Funding Request

March 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, 2009 60 days after start

Convert all outdated t-12 lighting to more energy efficient t-8 lighting

Clarenceville School District - Grandview Elementary

Livonia

Start Date

Expected Completion Date

Convert all outdated t-12 lighting to more energy efficient t-8 lighting

D VE

PP

May 1, 2009 could begin a phase in approach. Otherwise would wait until June 15, Convert all outdated t-12 lighting to more energy efficient t-8 lighting 2009 60 days after start Upgrade electrical distribution equipment and old outdated fuse panels with up to date 60-90 days after equipment 6/15/2009 start Upgrade electrical distribution equipment and old outdated fuse panels with up to date 60-90 days after equipment 6/15/2009 start Upgrade electrical distribution equipment and old outdated fuse panels with up to date 60-90 days after equipment 6/15/2009 start Upgrade electrical distribution equipment and old outdated fuse panels with up to date 60-90 days after equipment 6/15/2009 start

$

225,000

$

299,600

Replacement of Main water line

4/15/2009

$

45,000

Hook the last building up to the district's fiber network

4/15/2009

$

55,000

Submitted Requests - Not Approved

1 week after start 30-60 days after start

Route (Infrastructure Only)

726 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Clarenceville School District Livonia Clarenceville School District Livonia Pine River Area Schools L'anse Creuse Public Schools Macomb ISD Macomb ISD Macomb ISD

Project Name Clarenceville School District - All buildings

Project Description Separation of combined sewer system to eliminate contaminated backups into the buildings during severe storms

Start Date 4/15/2009

Clarenceville School District - District wide

Asphalt/Concrete repairs throughout the district

4/15/2009

Luther

Pine River Area Schools Luther Elementary Tustin Elementary

Roof Replacement. Roofs are out-of-warranty and leak. There is little or no insulation. Architects are completing RFP at the present time and project will begin as soon as the school year ends in early June. 6/6/2009

Macomb Macomb Macomb Macomb

LCPS MSN Green Roof Installation Glen H. Peters School Glen H. Peters School Glen H. Peters School

Macomb

Glen H. Peters School

Replace worn-out portion of roof with new green roof technology Renovate exterior doors. Replace windows. Brick work repair and tuck pointing. Modernize HVAC equipment and HVAC controls with energy efficient D.D.C. equipment.

Macomb

LCPS HSN Pool Lobby RTU-3 Replacement

Current unit undersized, outdated - remove and replace

Macomb

Replace antiqued tank, modernize associated controls

Expected Completion Date Funding Request 30-60 days after start $ 125,000 30-60 days after start $ 651,763

6/1/2009

8/30/2009 9/1/2009 8/10/2009 8/10/2009 8/9/2009

D VE $ $ $ $

150,000 200,000 300,000 40,000

8/9/2009

$

80,000

6/1/2009

9/1/2009

$

50,000

6/1/2009

9/1/2009

$

4,000

6/1/2009

9/1/2009

$

5,000

6/1/2009

9/1/2009

$

40,000

PP

O R

Macomb ISD L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools L'anse Creuse Public Schools

Macomb

LCPS HSN Expansion Tank Replacement LCPS HSN Concession Stand Roof Replacement LCPS Atwood Elementary Playground Restoration

L'anse Creuse Public Schools

Macomb

LCPS HSN Commons & Kitchen Additions

Construction of a new student commons area, expanding the existing kitchen, and renovating the existing building, including mechanical and electrical upgrades.

4/1/2009

8/1/2010

$

4,700,000

Marion Public Schools Marion

Marion Public Schools

Renovate Elementary Cafeteria

5/1/2009

8/25/2009

$

120,000

Marion Public Schools Marion

Marion Public Schools

replace floor coverings in elementary and High school

5/1/2009

6/1/2009

$

400,000

Marion Public Schools Marion

Marion Public Schools

Create New CAD classroom/workstation

5/1/2009

8/25/2009

$

5,000

Marion Public Schools Marion

Marion Public Schools

Replace water heater and renovate boiler room

5/1/2009

6/1/2009

$

20,000

Marion Public Schools Marion

Marion Public Schools

Replace doors and Hardware interior Doors

6/1/2009

8/25/2009

$

100,000

Marion Public Schools Marion

Marion Public Schools

Replace Heat piping in the High School 1992 additions

5/1/2009

8/25/2009

$

200,000

Marion Public Schools Marion

Marion Public Schools

Renovate High School Cafeteria

5/1/2009

8/25/2009

$

275,000

Martin Public Schools Martin

Martin Public Schools HVAC

replace HVAC in shop,Gyms, cafeteria

6.1.09

8.1.09

$

250,000

Martin Public Schools athletic field

Remove and replace all existing lights, lightpoles, & wiring on football field

4.1.09

5.1.09

$

260,000

Martin Public Schools walkways

remove & replace selected concrete walkways

6.1.09

8.1.09

$

13,000

Martin Public Schools building security

video surveillance system upgrade & expansion

6.1.09

8.1.09

$

25,000

Martin Public Schools midle school lockers

remove & replace lockers

6.1.09

8.1.09

$

50,000

Martin Public Schools Martin

Martin Public Schools parking lot

remove and replace parking lot at elementary school

6.1.09

7.1.09

$

100,000

Martin Public Schools Martin

Martin Public Schools emergency service

install emergency lighting and signage

4.1.09

6.1.09

$

10,000

Martin Public Schools Martin

Martin Public Schools athletic field

remove and replace all bleachers on selected fields

4.1.09

5.1.09

$

20,000

Macomb

tt i m

Martin Public Schools Martin Martin Public Schools Martin Martin Public Schools Martin

02262009

S

Re-grade/soil & seed playground

d e t

q e R

s

st

e u

ub

Martin Public Schools Martin

Replace roof

A T

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

727 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Marysville Public Schools Marysville Marysville Public Schools Marysville

Project Name

7/1/2009

12/1/2009

$

350,000

Marysville - Middle School

Project Description Replace original windows in old section of building for ENERGY efficiency; replace classroom carpeting; replace gym lights for ENERGY efficiency ENERGY conservation projects - replace curtain wall window system on two-story wing; replace lights and ceilings in corridors

7/1/2009

12/1/2009

$

550,000

7/1/2009

8/1/2010

$

1,341,900

$

260,000

9/1/2009

$

520,500

10/1/2009

$

600,000

4/1/2009

9/1/2009

$

1,059,600

4/1/2009

8/1/2009

$

80,000

4/1/2009

8/1/2009

$

105,000

4/1/2009

8/1/2009

$

120,000

4/1/2009

9/1/2009

$

150,000

Marysville -Morton Elementary

Start Date

Marysville Public Schools

Marysville

Marysvile - Marysville High School

Provide laptop computers for students (914) and staff (43); provide four desktop computers for each classrooms (43); provide one document camera for each classroom (43) to ADVANCE INSTRUCTION

Marysville Public Schools

Marysville

Marysville

Installation of wireless technology infrastructure in all classrooms, conference rooms, offices in all District buildings to ADVANCE INSTRUCTION 7/1/2009

Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools

Marysville Public Schools

Marysville Public Schools

Marysville Public Schools

Marysville Public Schools

Expected Completion Date

Marysville

Marysville -Morton Elementary

Marysville

Marysville - Stadium

Provide laptop computers for students (315) and staff (25); provide four desktop computers for each classrooms (25); provide one document camera for each classroom (25) to ADVANCE INSTRUCTION 4/1/2009 Replace SECURITY fencing; replace stadium lights for ENERGY efficiency; construct team rooms under bleachers 7/1/2009

P P A

O R 8/1/2010

Funding Request

D VE

Marysville

Marysville - Middle School

Marysville

Marysville -Gardens Elementary

Marysville

Marysville -Morton Elementary

Marysville

Marysville -Washington Elementary

Marysville

Marysville - Middle School

Marysville

Marysville

Provide laptop computers for students (720) and staff (43); provide four desktop computers for each classrooms (32); provide one document camera for each classroom (32) to ADVANCE INSTRUCTION Replace Media Center ceiling and lights for ENERGY efficiency; repipe existing boiler three-way valve to conserve ENERGY and water ENERGY management mechanical controls; exterior renovations and improvements; playground upgrade (baseball field) Improve site and interior ceiling and lights for ENERGY efficiency; replace classroom carpet and doors; install classroom cabinets and casework Improve and expand parking and sidewalks, exterior lighting improvements for ENERGY conservation and SECURITY; classroom casework Replace existing outdated telephone system to faciliate parent/teacher communication.

4/1/2009

8/1/2010

$

200,000

Marysville -Washington Elementary

Provide laptop computers for students (470) and staff (30); provide four desktop computers for each classrooms (30); provide one document camera for each classroom (30) to ADVANCE INSTRUCTION

4/1/2009

8/1/2009

$

735,000

Provide laptop computers for students (470) and staff (50); provide four desktop computers for each classrooms (50); provide one document camera for each classroom (50) to ADVANCE INSTRUCTION

3/1/2009

9/1/2009

$

849,000

Building additions and expansion, exterior remodeling, interior remodeling, mechanica and electrical work, computer workstations, laptops and wireless carts, printers, network electronics and other peripherals, expand and improve parking areas, replace sidewalks and curbing, upgrade site lighting 4/1/2009

8/1/2009

$

2,372,819

Marysville -Washington Elementary

Building additions and expansion, exterior remodeling and roof replacement, internal remodeling, mechanical and electrical work, classroom furnishings, computer workstations, laptops and wireless carts, printers, network electronics and other peripherals, expand and improve parking, replace sidewalks and curbing, upgrade site lighting, new fencing 4/1/2009

8/1/2009

$

3,958,200

Marysville - Middle School

Building additions and expansion, exterior remodeling and roof replacement; interior remodeling, mechanical and electrical work, classroom furnishings and kitchen equipment, computer workstations, laptops and wireless carts, printers, network electronics and other peripherals, expanding and improve parking, replace sidewalks and curbs 2/1/2009

9/1/2009

$

8,129,523

Marysvile - Marysville High School

Construct new ENERGY efficient High School (914 students) with attached central administration offices, including GREEN initaitve GEOTHERMAL heating/cooling system, ENERGY mechanical control system, maximization of ambient sunlight, occupancy sensor lights/heating/cooling, SUSTAINABLE stained poured concrete floors

8/1/2010

$

58,684,176

Marysville

Marysville

Marysville -Gardens Elementary

tt i m

Marysville

Marysville -Morton Elementary

ub

Marysville

Marysville

Marysville

02262009

d e t

S

T O

s t s

-N

e u

q e R

Submitted Requests - Not Approved

3/1/2009

Route (Infrastructure Only)

728 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Marysville Public Schools Mayville Community School District

Menominee Area Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools

Project Name

Project Description

Expected Completion Date

Start Date

Expand High School parking lot; install NATURAL LIGHT classroom dimmers to enhance instruction and save ENERGY; install insulation cover board on roof for ENERGY efficiency; add kitchen equipment 7/1/2009 Construct pole barn for storage of maintenance and athletic equipment, including toile facilities for access of athletic fields 7/1/2009 Installation of additional classroom cabinets, casework, sinks and display boards; additional kitchen equipment 3/1/2009 Upgrade existing playground structures to promote PHYSICAL FITNESS and outdoor fun 9/1/2009 Construct addition to back of Maintenance Facility to accommodate work area, storage space, and garage for school vehicles 6/1/2009 The construction of windpowered energy systems to supplement power sources to school facilities. 5/1/2009

Marysville

Marysvile - Marysville High School

8/1/2010

Marysville

Marysvile - Marysville High School

Marysville

Marysville - Gardens Elementary

Marysville

Marysville - Morton, Gardens, Washington

Marysville

Marysville - Maint Facility

Mayville

Mayville Community School District

Menominee

Project will make energy efficiency improvements to all district buildings--the newest building is over 40 years old, and some are near 60 years old-- and all have original boilers, etc. Project would include staged boilers, variable speed fans, more efficient hot water circulation, greener lighting, improved fenestration, some window replacement, along with more efficient control systems. We are in the rural Upper Energy renovations--Menominee Area Public Peninsula of Michigan, where winters are brutally cold--windchills last week were -30F Energy savings would greatly impact what students can learn in the classroom. May-June, 2009 schools

Meridian

Okemos Hiawatha E.S.

Asphalt replacement

Meridian

Okemos Cornell E.S.

Energy Management System

Meridian

Okemos Edgewood E.S.

Meridian

Okemos Hiawatha E.S.

Meridian

Okemos Bennett Woods E.S.

Meridian

Okemos Edgewood E.S.

Meridian

Okemos Hiawatha E.S.

Meridian

Okemos Wardcliff E.S.

Meridian Meridian

$

295,000

D VE $

300,000

$

94,000

$

300,000

$

700,000

8/1/2009

$

100,000

September, 2009

$

4,000,000

$

30,000

$

50,000

Energy Management System

$

50,000

Energy Management System

$

70,000

Asphalt replacement

$

100,000

Asphalt replacement

$

100,000

Boiler replacement

$

100,000

Asphalt replacement

$

125,000

Okemos Edgewood E.S.

Window replacement

$

125,000

Okemos Central E.S.

Asphalt replacement

$

150,000

Okemos Chippewa M.S.

Update game fields

$

160,000

Okemos OHS

Update practice fields

$

160,000

Okemos Bennett Woods E.S.

Roof replacement

$

225,000

Okemos Kinawa M.S.

Roof replacement

$

250,000

Meridian

Okemos Kinawa M.S.

Asphalt replacement

$

300,000

Meridian

Okemos Chippewa M.S.

Roof replacement

$

300,000

Meridian

Okemos Chippewa M.S.

Replace steam boiler

$

400,000

tt i m

ub

Meridian Meridian Meridian Meridian

02262009

S

d e t

T O

s t s

-N

e u

q e R

Submitted Requests - Not Approved

12/1/2009

Funding Request

9/1/2009 11/1/2009

P P A

O R 10/1/2009

Route (Infrastructure Only)

729 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Okemos Public Schools Okemos Public Schools Okemos Public Schools Okemos Public Schools

Merrill Community Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Mesick Consolidated Schools Bullock Creek School District Bullock Creek School District Bullock Creek School District Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Meridian

Okemos Kinawa M.S.

Window replacement

$

400,000

Meridian

Okemos Hiawatha E.S.

Roof replacement

$

450,000

Meridian

Okemos Chippewa M.S.

Update pool area

$

700,000

Meridian

Okemos HS

Athletic wing updates

$

5,000,000

Merrill/Jonesfield Township

Essential rennovations to Merrill Elementary, Merrill Middle and Merrill High Schools including roof insulation and repairs, energy efficiency upgrades to heating/cooling systems. This project was engineered by the architectural firm Kingscott Associates and by Granger Construction. Cost estimates and project scope are ready to be Merrill Community Schools Rennovations and implemented. Please see additional data contained in the additional sheets as listed Community Center on the tabs below. Mesick Cons Schools Clean & replace heating Need to clean and replace (as needed) old heating duct work in both the Elementary duct work--Elem & M.S Bldgs. and Middle School Buildings Mesick-Clean & replace heating duct work-- Need to clean and replace (as needed) old heating duct work in both the Elementary Elem & M.S Bldgs. and Middle School Buildings Mesick Cons Schools Gym Lights & Window Need to replace gym lights in all 3 buildings and windows in Elementary and Middle Replacements School Buildings for Energy efficiency/savings. Need to replace gym lights in all 3 buildings and windows in Elementary and Middle Mesick-Gym Lights & Window Replacements School Buildings for Energy efficiency/savings. Mesick Cons Schools Replace Deteriorating The facia on the High School building has deteriorated and needs to be replaced to Facia -- High School Bldg prevent heat loss Mesick-Replace Deteriorating Facia -- High The facia on the High School building has deteriorated and needs to be replaced to School Bldg prevent heat loss

Mesick

T O

Mesick Mesick Mesick Mesick Mesick

s t s

-N

e u

O R

P P A

D VE

4/1/2009

8/31/2010

$

14,724,232

June, 2009

Sept, 2009

$

140,000

June, 2009

Sept, 2009

$

140,000

June, 2009

Sept, 2009

$

160,000

June, 2009

Sept, 2009

$

160,000

April,2009

Sept, 2009

$

75,000

April,2009

Sept, 2009

$

75,000

Sept, 2009

$

350,000

Sept, 2009

$

175,000

Sept, 2009

$

175,000

Mesick

Mesick-Attic Fire Suppression Mesick Cons Schools Replace/update Fire Alarm System

Mesick

Mesick-Replace/update Fire Alarm System

Fire Marshall requiring Attic Fire Suppression or egress doors in High School Building after trusses failed in 2004 and construction codes changed since original construction in 1997-98. April,2009 We need to replace and update the fire alarm system in both the Elementary and Middle School Buildings to help protect our students and staff. June, 2009 We need to replace and update the fire alarm system in both the Elementary and Middle School Buildings to help protect our students and staff. June, 2009

Midland

Bullock Creek Gym Safety Upgrades

Replacing Gym Bleachers and End Zone Safety Pads-BCHS, BCMS

6/15/2009

8/15/2009

$

226,300

Midland

Bullock Creek Roof Replacement

Partial Roof Replacemetns at BCHS, BCMS amd Floyd School

6/15/2009

8/15/2009

$

677,000

Midland

Bullock Creek Site Work

Asphalting Various Drives and Parking Areas

6/15/2009

8/15/2009

$

703,812

Millington Community Schools

Refurbish Doors and Windows in all Schools

4/30/2009

8/31/2009

$

21,000

Millington Community Schools

Add Sensory room Meachum Jr High

$

40,000

Millington Community Schools

Install fiber optic cabling campus wide.

6/1/2009

8/30/2009

$

125,000

Millington Community Schools

Communications Systems for all buildings.

6/15/2009

8/15/2009

$

140,000

Millington Community Schools

Expand Cafeteria and Kitchen area at Meachum School.

6/15/2009

8/15/2009

$

425,000

Millington

Millington Community Schools

Asphalting District wide

6/15/2009

8/15/2009

$

1,200,000

Millington

Millington Community Schools

Replace roof maintenance building.

3/31/2009

7/31/2009

$

29,000

Mesick

m b u

Millington Millington Millington Millington Millington

02262009

S

R d

e t t

it

eq

Submitted Requests - Not Approved

Route (Infrastructure Only)

730 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools Millington Community Schools

Location City or Township

Project Name

Millington

Millington Community Schools

Millington

Project Description

Start Date

Expected Completion Date

Funding Request

8/31/2009

$

30,000

Millington Community Schools

Provide Mobile lab per building. 3/31/2009 Update current teaching equipment to include teacher use only computers that include video streaming capability. 3/31/2009

8/31/2009

$

39,000

Millington

Millington Community Schools

Replace Sidewalks district wide.

4/30/2009

8/30/2009

$

51,600

Millington

Millington Community Schools

Add projection capability for each classroom.

3/31/2009

8/31/2009

$

120,000

Millington

Millington Community Schools

Upgrade computer labs.

3/31/2009

$

126,000

Millington

Millington Community Schools

4/30/2009

$

170,000

Millington Community Schools/Kirk School

8/30/2009

$

245,000

Millington

Millington Community Schools

Construct new bus garage.

PP

1/31/2010

Millington

Refurbish Glaza Building and reduce size Phase II Kirk School Project. Add larger computer lab to Kirk Elementary. Add a sensory room to Kirk Elementary.

4/30/2009

8/30/2009

$

492,000

Millington

Millington Community Schools

Build new Gymnasium/Auditorium with proper Acoustics at Kirk School.

4/30/2009

1/31/2010

$

1,450,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

Replace rusting exterior doors with higher efficient doors at 5 entry points.

6/1/2009

9/1/2009

$

20,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

Replace 1 broken heater and add 2 heating/air conditioning units in high school gym. 6/1/2009

9/1/2009

$

25,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

6/1/2009

9/1/2009

$

30,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

6/1/2009

9/1/2009

$

60,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

Update and enhance irrigation system for grounds. Energy conservation lighting upgrade from T-12 to T-8 lighting and install infrared/motion detection sensors in hallways, locker rooms and restrooms. Window Replacement. Remove current windows in 3 wings and replace with higher efficient windows and less glass.

6/1/2009

9/1/2009

$

175,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

Upgrade electrical system to support new technological needs.

6/1/2009

9/1/2009

$

350,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

7/31/2009

$

70,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

Roof repair and replacement to fix leaks and increase R value with thermal insulation. 5/1/2009 Improve Security by installing security cameras and proxy entrance systems on campus. 6/1/2009

9/1/2009

$

48,000

Mio-Ausable Schools

Mio

Mio AuSable Schools

Replace existing lockers in Middle School.

6/1/2009

9/1/2009

$

50,000

Mio-Ausable Schools Public Schools Of Calumet

Mio

Mio AuSable Schools

Resurface parking lot and add proper lighting.

6/1/2009

9/1/2009

$

85,000

Mohawk

Calumet Mohawk Wood Storage Facility

Building to store wood chips for heating plant

4/1/2009

7/1/2009

$

250,000

Morenci Area Schools

Partially remodeling, furnishing, and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping educational technology; constructing a new running track; and developing and improving sites.

$

1,400,000

Morrice Area Schools

Erecting, furnishing and equipping additions to and partially remodeling, furnishing and re-furnishing, equipping and re-equipping the Morrice Elementary and junior/high school buildings; developing and equipping improvements to the playground;

$

12,175,000

Morrice signage

electronic signs for each building to promote school and community events

$

60,000

Mt. Morris Junior High

Handicap Accessibility

$

390,000

m b u

Morenci Area Schools Morenci

Morrice Area Schools

Morrice

Morrice Area Schools

Morrice

Mt. Morris Consolidated Schools Mt. Morris

02262009

S

s

st

O N

R d

e t t

it

A T

e u

eq

4/30/2009

Submitted Requests - Not Approved

9/1/2009

O R 8/31/2009

11/9/2009

D VE

Route (Infrastructure Only)

731 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Junior High

General Building Work (Interior), Ceilings, floors, walls, casework, lockers, media center, acoustics,kitchen

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Junior High

General Work (Exterior) Brick/masonry repairs, windows,roof, facia panel

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Junior High

Mechanical System: Heating/Cooling, Exhaust, sanitary, fire protection, temperature contraols

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Montague Elementary

Sitework, General Building Work, Exterior/Interior, Mechanical, Electrical, restroom Renovations, Handicap Accessibilty,

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Junior High

Health and Safety Facility Projects- Asbestos removal, Handrail installation/replacement, guardrail installation/replacement, fire alarm

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris Junior High

Athletic facilities: press Box replacement,fields

Mt. Morris Consolidated Schools Mt. Morris

Mt. Morris District Wide

Mt. Morris Consolidated Schools Mt. Morris Township

Funding Request

$

429,389

D VE $

492,863

$

652,350

$

1,294,510

$

98,208

$

250,000

Technology infrastructure, equipment, scoreboards, exposed cables

$

600,000

Mt. Morris, Elisabeth Ann Johnson High School

Mechanical System: Heating/Cooling, Exhaust, sanitary, fire protection, temperature contraols

$

334,470

Mt. Morris Consolidated Schools Mt. Morris Township

Mt. Morris Pinehurst Elementary

Sitework, General Building Work, Exterior/Interior, Mechanical, Electrical, restroom Renovations, Handicap Accessibilty,

$

1,128,256

Mt. Morris Consolidated Schools Mt. Morris Township

Mt. Morris, Elisabeth Ann Johnson High School

General Work (Exterior) Brick/masonry repairs, windows

$

73,880

Mt. Morris Consolidated Schools Mt. Morris Township

Mt. Morris, Elisabeth Ann Johnson High School

Health and Safety Facility Projects- Asbestos removal, Handrail installation/replacement, guardrail installation/replacement

$

95,596

Mt. Morris Consolidated Schools Mt. Morris Township

Mt. Morris, Elisabeth AnnJohnson High School Handicap Accessibility

$

160,267

Mt. Morris, Elisabeth Ann Johnson High School

General Building Work (Interior), Ceilings, floors, walls, casework, lockers Create storage facility at Muskegon Heights High School, thus increasing educational capacity Early Spring 2009

$

789,094

$

200,000

Tuckpoint mortar joints at all district buildings

d e tt

P P A

N s

st

e u

q e R

T O

O R

Mt. Morris Consolidated Schools Mt. Morris Township Muskegon Heights School District Muskegon Heights Muskegon Heights School District Muskegon Heights

Muskegon Heights District Tuckpointing

Early Spring 2009

$

400,000

Muskegon Heights School District

Increase energy efficiency at Lindbergh Adult and Community Education Center. Project includes re-construction and retro-fitting of existing energy structures and Muskegon Heights Lindbergh Energy Project systems

Early Spring 2009

$

700,000

Shelby/New Era Elementary

6/9/2009

8/9/2009

$

200,000

5/1/2009

12/1/2009

$

68,320

$

300,000

b u S

Muskegon Heights

Shelby Public Schools New Era Newaygo County Resa Newaygo Newaygo County Resa Newaygo

02262009

t i m

Muskegon Heights High School Storage

NC RESA Newday NC RESA Newday

New roof on New Era Elementary Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Construct a facility for storage of recycle material for staging before taken to recycle vendor

Submitted Requests - Not Approved

Route (Infrastructure Only)

732 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo Public School District Newaygo Public School District

Newaygo Public School District Newaygo Public School District Newaygo Public School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Niles Community School District Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools Brandywine Community Schools

Project Name

Project Description

Start Date

Expected Completion Date

Newaygo Public Schools - High School Newaygo Public Schools - Velma Matson Upper Elementary

Newaygo Public Schools - Athletic Field Track Project - Installation of an eight lane track, new lighting and concession stand. This is being done in partnership with the City of Newaygo to improve recreational facilities to enhance economic development of the City and surrounding area. 5/1/2009

8/30/2010

Replace current 50+ year old boiler with high efficiency boiler at the Upper Elementary5/1/2009

8/30/2009

Newaygo

Newaygo Public Schools - All Buildings

Go Green Initiative - All Newaygo Public School Buildings For the past three years NPS has been practising energy efficiencies through the use of Energy Education, Inc which builds on the human element of energy usage. Through these efforts the school has reduced its energy consumption by over 30%. The next step in this process is to replace our Energy Management Systems in all buiildings with updated software and controls to monitor, control, and optimize the performance of all heating, lighting and air handling processes. 3/1/2009

Newaygo

Replace and Repair roofs

Newaygo

Newaygo Public Schools - High School Newaygo Public Schools - Vera Wilsie Elementary

Niles

Niles

T12 to T8 light conversion in 12 buildings

Niles

Niles

Niles

Newaygo

Funding Request

$

809,500

$

70,000

Sept 30 2009

$

200,000

5/1/2009

8/1/2009

$

40,000

5/1/2009

8/1/2009

$

40,000

7/1/2009

12/1/2009

$

587,576

Replacement of exterior and interior doors,10 buildings

6/1/2010

6/1/2011

$

627,000

Niles

Replacement of univent units in several classrooms

6/1/2009

9/1/2009

$

760,195

Niles

Niles

Asbestos removal from boiler rooms, 10 buildings

6/1/2009

1/1/2010

$

800,000

Niles

Niles

Asbestos floor tile removal from classrooms, 11 buildings

6/1/2009

9/1/2010

$

1,045,000

Niles

Niles

Exterior card reader security system, 11 buildings

6/1/2009

9/1/2009

$

72,000

Niles

Niles

ADA signage in 12 buildings

6/1/2009

9/1/2009

$

150,000

Niles

Niles

Replace partitions and fixtures in 47 restrooms

6/1/2009

9/1/2009

$

376,000

Niles

Niles

6/1/2009

9/1/2010

$

600,000

Niles

Niles

Grind and refinish all of the terrazzo hallway floors Resurfacing or replacement of parking lots, improving the traffic flow,sidewalks and curbs repairs, 12 locations

6/1/2009

10/1/2009

$

1,971,555

Niles Township

Brandywine Middle/High School

8/1/2009

$

20,000

Brandywine Bell Education Center

New sewer lift station 6/1/2009 Energy efficient windows; ceiling tiles throughout building; original to building from mid 60's 6/1/2009

8/1/2009

$

200,000

Brandywine Bell Education Center

Heating plant replacement

6/1/2009

8/1/2009

$

250,000

Brandywine District wide

Network connectivity upgrades between buildings;upgrade to fiber optics

7/1/2009

9/1/2009

$

100,000

6/1/2009

8/1/2009

$

10,000

Niles Township

Brandywine Middle/High School, Merritt & Bell Wheel chair accessible door entry Parking lot repaving; original to building from mid 60's in one section; mid 80's in Brandywine Bell Education Center second section

6/1/2009

8/1/2009

$

50,000

Niles Township

Brandywine Middle/High School

Faculty and student parking lots repaving

6/1/2009

8/1/2009

$

250,000

Niles Township

Brandywine Middle/High School

Kitchen Remodel including walk in cooler, stoves etc.

6/1/2009

8/1/2009

$

300,000

Newaygo

m b u

Niles Township Niles Township

S

Niles Township

Niles Township

02262009

eq

s

st

e u

O N

R d

e t t

it

A T

Replace and Repair roofs

Submitted Requests - Not Approved

PP

O R

D VE

Route (Infrastructure Only)

733 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

North Branch Area Schools North Branch Area Schools North Branch Area Schools North Branch Area Schools North Branch Area Schools

North Branch Area Schools

Project Name

Project Description

North Branch

North Branch

North Branch

North Branch

Add security camera and monitor to the new elementary facility.

North Branch

North Branch

North Branch

North Branch

The district needs to replace bleachers in an elementary and middle building. These bleachers do not operate properly and we have some safety concerns. Make improvements to the district maintenance facility to use for storage. Currently the building roof leaks and structure is not secure.

North Branch

The district needs to improve its existing parking areas they need to be repaired and resurfaced. In addition the district needs to increase parking capacity to accommodate staff, students, and parents. 6/15/2009

North Branch

North Muskegon Public Schools North Muskgon

$

50,000

8/30/2009

$

85,000

8/30/2009

$

200,000

8/30/2009

$

275,000

North Branch

The North Branch high school will require a new roof within the next two years. The building was opened in 1994 and the current roof has exceeded the 10 year warranty and has begun to have problems. The district would like to to replace the roof before the repairs become more costly. If the district has to use general fund dollars for this job it will have an impact on the dollars available for the educational program. 6/15/2009

8/30/2009

$

700,000

North Muskegon Public School

Upgrade existing technology including SAN/Server, Student computers, telephone system, security system, network infrastructure, classroom multimedia systems. Building remodeling and Busses.

Early 2011

$

1,500,000

Remodeling, reequipping, and refurnishing School district buildings, including security systems, life safety systems, barrier free, mechanical, electrical, energy conservation, locker room facilities, food service facilities, classroom improvements, and acquiring school buses; acquiring and installing technology infrastructure and equipment in School District buildings, including classroom computers, wireless networks and video presentation systems; constructing, furnishing and equipping additions to School District buildings, including a cafeteria addition at the high school and vestibule additions at the middle school; and improving and developing sites, including storm drainage, parking and roadways, sidewalks, structures, signage and outdoor athletics fields and facilities in the School District.

Oak Park

$

24,000,000

Olivet Community Schools

erecting, furnishing and equipping additions to Fern Persons Elementary School for a classroom addition and to the Olivet Middle School for cafeteria expansion; partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving athletic facilities, storage buildings, play fields and playgrounds; purchasing school buses; and acquiring, developing and improving sites.

$

14,500,000

Onekama Consolidated Schools

Smart Boards including wiring

6/9/2009

7/9/2009

$

25,000

Onekama Consolidated Schools

Generators

6/9/2009

7/9/2009

$

30,000

st

d e tt

Oak Park City School District

Olivet

Onekama Consolidated Schools Onekama Onekama Consolidated Schools Onekama

02262009

S

m b u

q e R

s

O R

PP

5/15/2009

A T

it

Olivet Community Schools

6/15/2009

O N

Submitted Requests - Not Approved

8/30/2009

D VE

450,000

6/15/2009

8/30/2009

Funding Request

$

e u

Oak Park City School District

Start Date

The district opened a new elementary building November 2008 for approximately 950 students. The new facility is located within the village but lacks sidewalks for the children to use to safely walk to school. Currently the students who walk have to walk in yards or along side a busy road to get to school. The district would like to add sidewalks along the roadside and a path to connect this site to our other elementary building. 4/15/2009

North Branch

Expected Completion Date

November 2009 bond vote.

Route (Infrastructure Only)

734 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Onekama Consolidated Schools Onekama

Onekama Consolidated Schools

Oscoda Area Schools Oscoda

Oscoda, Richardson Elementary

Oscoda Area Schools Oscoda

Oscoda, Cedar Lake Elementary

Oscoda Area Schools Oscoda

Oscoda, Richardson Elementary

Oscoda Area Schools Oscoda

Oscoda, Oscoda High School

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Project Description

Start Date

Expected Completion Date

Wiring and supply of new computer lab Replace bathroom sinks with low flow sensor faucets, original toilets with dual flush toilets Replace classroom sinks with low flow sensor faucets, original toilets with dual flush toilets Energy conservation lighting upgrade from T-12 to T-8 Lighting and from incandescent lights to high-pressure sodium and associated ceiling repair/replacement Replace bathroom sinks with low flow sensor faucets, original toilets with dual flush toilets, original shower heads with sensored heads Replace exterior windows with energy efficient, tempored windows with thermal, EE glass

6/9/2009

7/9/2009

6/20/2009

7/15/2009

6/20/2009

7/20/2009

6/15/2009

$

D VE

100,000

$

6,500

$

41,000

$

51,000

$

62,300

7/15/2009

$

63,600

O R

5/1/2009

Funding Request

6/1/2009

PP

7/2/2009

7/15/2009

8/15/2009

$

70,000

6/10/2009

7/10/2009

$

148,000

5/1/2009

6/1/2009

$

169,000

$

213,000

6/15/2009

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Oscoda Area Schools Oscoda

Oscoda, Cedar Lake Elementary

Energy conservation lighting upgrade from T-12 to T-8 Lighting and from incandescent lights to high-pressure sodium and associated ceiling repair/replacement Replace original floor tile from 1953 throughout with green products that reduce life cycle costs of labor and chemical applications.

Oscoda Area Schools Oscoda

Oscoda, Richardson Elementary

Replace one original boiler from 1965 with two smaller energy efficient units

Oscoda Area Schools Oscoda

Oscoda, Oscoda High School

Replace ceiling in auditorium with green products

Oscoda Area Schools Oscoda

Oscoda, Oscoda High School

8/15/2009

$

288,000

Oscoda Area Schools Oscoda

Oscoda, Oscoda High School

Continue replacement of exterior window walls of plate glass with energy efficient Kalwall and double pane thermal tempored windows and install drop ceilings to lower the height from 22 ft to 12 ft ceilings 6/15/2009 Replace floor tile throughout with green products that reduce life cycle costs of labor and chemical applications. 6/15/2009

7/2/2009

$

362,000

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Replace original boilers at the HS with two energy efficient steam boilers

6/15/2009

6/25/2009

$

458,000

Oscoda Area Schools Oscoda

Oscoda, Cedar Lake Elementary

3/1/2009

4/1/2009

$

24,357

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Oscoda Area Schools Oscoda

Oscoda, Cedar Lake Elementary

Oscoda Area Schools Oscoda

Oscoda, Oscoda High School

itt

d e t

bm

A T

st

e u

q e R

s

O N

6/15/2009

Replace exterior doors with energy efficient doors and thermal, broken, aluminum doors and frames and access controls with a barrier free door access Replace bathroom sinks with low flow sensor faucets, original toilets with dual flush toilets Energy conservation lighting upgrade from T-12 to T-8 Lighting and from incandescent lights to high-pressure sodium

4/22/2009

5/22/2009

$

32,450

2/1/2009

3/15/2009

$

42,500

Replace exterior doors with energy efficient doors and thermal, broken, aluminum doors and frames and access controls with a barrier free door access

4/22/2009

5/22/2009

$

47,900

7/15/2009

$

62,000

7/15/2009

$

98,000

Oscoda, Richardson Elementary

Replace exterior doors with energy efficient doors and thermal, broken, aluminum doors and frames and access controls with a barrier free door access 6/15/2009 Replace floor tile throughout with green products that reduce life cycle costs of labor and chemical applications. 6/18/2009

Oscoda, Richardson Elementary

Roof replacement to increase R value with thermal insulation.

4/22/2009

5/22/2009

$

142,000

Oscoda, Cedar Lake Elementary

Roof replacement to increase R value with thermal insulation.

4/22/2009

5/22/2009

$

252,000

Oscoda Area Schools Oscoda

Oscoda, Richardson Middle School

Roof replacement to increase R value with thermal insulation.

4/22/2009

5/22/2009

$

326,500

Oscoda Area Schools Oscoda

Oscoda, Oscoda High School

Roof replacement to increase R value with thermal insulation.

4/22/2009

5/22/2009

$

459,000

Oscoda Area Schools Oscoda

Oscoda, Cedar Lake Elementary

Replace original serving line from 1950

6/20/2009

7/20/2009

$

11,000

Oscoda Area Schools Oscoda Oscoda Area Schools Oscoda Oscoda Area Schools Oscoda Oscoda Area Schools Oscoda

02262009

Oscoda, Richardson Elementary

u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

735 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lakeville Community Schools

Lakeville Community Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools Owosso Public Schools

West Ottawa Public School District

West Ottawa Public School District

Van Buren ISD Elkton-Pigeon-Bay Port Laker Schools Elkton-Pigeon-Bay Port Laker Schools Elkton-Pigeon-Bay Port Laker Schools Elkton-Pigeon-Bay Port Laker Schools Elkton-Pigeon-Bay Port Laker Schools Elkton-Pigeon-Bay Port Laker Schools

Project Name

Project Description

Start Date

Expected Completion Date

LakeVille Middle School

Create an Alternative Energy SmartLab for middle school students. The alternative energy SmartLab will use technology to provide introductory through advanced inquiry based exploration of alternative energy technoligies. The following units of study will be supported - Principles of electricity, Geothermal heat exchange, solar energy (Passive and Photovoltaic cells), Wind Energy (with functioning wind turbines) Hydrogen Energy (with reversible PEM fuel cell technology), other alternative energy sources (including hydroelectric, nuclear and biofuels) 6/15/2009

12/30/2009

Otisville

LakeVille High School, Alternative HS Southwest Campus, Middle School, Columbiaville Elementary, Otisville Elementary, Otter Lake Elementary

Install interactive classroom technologies that will benefit all students in all classes to include Interactive whiteboard @ $1600 ea, projector @ 875ea., spare lamp and filter @$300 ea., data cable and switch port @$300 ea., sound field @ $1350 ea., teacher computer @ $650 ea., document camera @ $500 ea, electrical upgrades @$1000 per room, Mount / install $1300 per room contingency $725 Total = $8600 per classroom for 101 classrooms 6/15/2009

O R

Owosso

Owosso

Door Upgrades - District wide

Owosso

Owosso

Roofing Projects

Owosso

Owosso

Lighting upgrade for energy efficiency

Otisville

s

D VE $

153,370

12/30/2009

$

868,600

7/9/2009

9/9/2009

$

220,000

6/1/2009

6/9/2009

$

140,000

6/9/2009

8/9/2009

A T

O N

Funding Request

PP

$

200,000

1st phase-Mar09/ 1st phase - Aug 2nd phase June 09/2nd phase 09 September 09

$

1,200,000

6/9/2009

8/9/2009

$

250,000

Owosso

Owosso

Pool Renovation

Owosso

Owosso

Asbestos Removal

Owosso

Owosso

Sidewalks and Entrance ways upgrades

6/9/2009

8/9/2009

$

500,000

West Ottawa Public Schools - Lakewood Elementary

This project seeks to replace the current EDPM roof installed in 1992 with a white reflective PVC roof. The roof is currently in poor condition and the benefits of a white reflective Energy Star roof would help reduce building energy costs and provide an improved learning environment for students. The life expectancy for the new roof would be 15 to 20 years. 6/1/2009

9/1/2009

$

260,000

9/1/2009

$

260,000

11/1/2009

$

3,500,000

10/1/2009

$

255,688

11/1/2009

$

117,341

10/1/2009

$

255,688

9/6/2009

$

221,600

9/6/2009

$

221,600

6/15/2010

$

466,828

Park Township

Pigeon Pigeon

02262009

Building new facility for at-risk special education students that have dropped out of school or have reached the age of 18 years old. All drawings are complete and bidding will take place the first part of February, 2009. Building will be built with green environment in mind and will quailfy for LEED certification. Construction will take Van Buren I.S.D. Young Adult Program place in April 2009. 4/1/2009 Elkton-Pigeon-Bay Port Laker Schools - Laker Replace inefficient fifty (50) year od school heating boiler with modern, energy efficien prototype 6/10/2009 High Elkton-Pigeon-Bay Port Laker Schools - Laker High Conserve Energy by replacing inefficient hallway, gnasium, and classroom lighting 6/15/2009 Replace inefficient fifty (50) year od school heating boiler with modern, energy efficien prototype 6/10/2009 Laker Replace all exterior doors with energy-efficient models and enhanced sercurity for Laker student safety 5/15/2009 Elkton-Pigeon-Bay Port Laker Schools - Laker Replace all exterior doors with energy-efficient models and enhanced sercurity for High student safety 5/15/2009 Replacing fifty (50) year old original windows with new energy conserving, weather Laker tight models 8/15/2009

ub

Pigeon

Pigeon

e t tt

This project seeks to replace the current EDPM roof installed in 1993 with a white reflective PVC roof. The roof is currently in poor condition and the benefits of a white reflective Energy Star roof would help reduce building energy costs and provide an improved learning environment for students. The life expectancy for the new roof would be 15 to 20 years. 6/1/2009

i m

Paw Paw

Pigeon

eq

R d

West Ottawa Public Schools - Lakeshore Elementary

Park Township

Pigeon

e u

st

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

736 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Elkton-Pigeon-Bay Port Laker Schools Pigeon

Project Name Project Description Elkton-Pigeon-Bay Port Laker Schools - Laker Replacing fifty (50) year old original windows with new energy conserving, weather High tight models

Start Date 8/15/2009

Plainwell Community Schools

Plainwell

Plainwell Community Schools

Erecting, furnishing and equipping additions to and remodeling, refurnishing and reequipping school district buildings; acquiring and installing educational technology improvements; and developing and improving sites.

Oakland Schools

Pontiac

Oakland Schools-Technical Campus NE

Upgrades to a career and technical education facility replacing bldg infrastructure, lighting, plumbing, security, electrical, HVAC and upgrading labs

Pontiac-SAN VMWare Pontiac-Hardware Updates and Integration Tools

Storage area network, virtual server solution,and VMWare licensing. Currently, staff and students do not have a location to store files, and application servers are aging past the useful life. A storage solution in a virutual server environment would allow the students, staff, and district as a whole to benefit in many ways. Computers users would have a secure location with back-ups available for file storeage. Severs could be virtualized on up-to-date hardware which will improve performance, reliability, and availability to all users throughout the district. It provides space for future growth. The solution would also provide for a significant reduction in power comsumption which would save the district money for years to come. 5/9/2009 Hardware updates, including technology integration tools for the classrooms and student learning labs. 6/9/2009

Pontiac-Generator and UPS

Purchase and installation of a Generator and Uninterruptible Power Source (UPS) for the network head end. Currently, the network head end is housed in an area that regularly loses power. When power is lost the entire district is without phones, Internet, and server access. This has a negative impact on student instruction. This project would allow all student instruction activities to continue in the event of a power loss at the network head end. Project would include a Natural Gas generator with installed walls and lights for safety and security, cabling, automatic transfer switch, appropriately sized UPS, cabling and software to control UPS, and complete installation services. It would provide adequate power to run all servers, air conditioning, and some lights within the network head end. 4/9/2009

Pontiac City School District Pontiac City School District

Pontiac City School District

Lenawee ISD Kalkaska Public Schools

Pontiac Pontiac

T O

Expected Completion Date

5/1/2009

6/15/2010

N s

$

466,828

D VE $

21,840,000

$

5,000,000

9/9/2009

$

600,000

9/9/2009

$

300,000

5/9/2009

$

600,000

12/15/2009

O R

P P A

Funding Request

Route (Infrastructure Only)

t s e

Pontiac

Raisin Township

Lenawee ISD

Rapid City

Rapid City Elementary

Ravenna Public Schools Ravenna Reed City Area Public Schools Reed City Reed City Area Public Schools Reed City

Reed City Area Public Schools Reed City

02262009

S

m b u

R d

e t t

it

u q e

Ravenna Public Schools Reed City Area Public Schools - Norman Elementary

WJR ESC Building: Replace old HVAC system with an energy-efficient closed loop chiller system, provide back-up emergency cooling for the technology servers area and try to re-use heat from servers during the winter months.

6/1/2009

9/1/2009

$

353,625

Improvements and remodeling of existing structure

June, 2009

August, 2010

$

780,000

$

15,800,000

erecting, furnishing and equipping additions to the middle school and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; erecting, furnishing and equipping a new preschool building; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving athletic/physical education facilities, playfields and play areas; purchasing school buses; and developing and improving sites. Master Clock System for Elementary K-2

Reed City Area Public Schools Middle School SECURITY:

Replace Door Hardware and locks

7/1/2009

8/14/2009

$

13,860

6/8/2009

8/1/2009

$

18,000

7/24/2009

$

30,000

ENERGY SAVINGS: Installation of DDC control system at Central Office to control classroom heat, Roof Top Unit, Boiler and related pumps and Domestic Hot 7/1/2009 Reed City Area Public Schools - Central Office water system. Installation of head end for remote access and monitoring.

Submitted Requests - Not Approved

737 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Reed City Area Public Schools Reed City

Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Reed City Area Public Schools Davison Community Schools Davison Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools

Project Name

Project Description

Reed City Area Public Schools - Norman Elementary

Start Date

Expected Completion Date

ENERGY SAVINGS: Installation of DDC control system at Norman Elementary to control classroom heat, Air Handling Units, Boiler and related pumps and Domestic Hot water system. Installation of head end for remote access and monitoring.

6/8/2009

8/1/2009

ENERGY SAVINGS: Installation of DDC control system at Middle School to control classroom unit vents, all Air Handling Units, Boilers and related pumps and Domestic Hot water system. Installation of head end for remote access and monitoring. 7/1/2009

Funding Request

$

45,000

$

110,000

$

165,000

8/21/2009

$

450,000

8/3/2009

$

12,000

8/3/2009

$

12,000

8/3/2009

$

25,000

6/12/2009

$

27,000

6/12/2009

$

30,000

8/1/2010

$

25,000

8/1/2010

$

65,000

D VE

Reed City

Reed City Area Public Schools - Middle School Reed City Area Public Schools - High School Middle School Resurface parking lots 6/8/2009 Reed City Area Public Schools - Middle ENERGY SAVINGS: Middle School Roof Replacement: Add 6" of School insulation and cover with Duro-Last membrane 8/1/2009 Install Security Cameras in Central Reed City Area Public Schools - Central Office SECURITY: Alt Ed Office - Alt Ed building 6/8/2009 Reed City Area Public Schools SECURITY: Install Security Cameras in Transportation Maintenance Center 6/8/2009 Transportation Center Reed City Area Public Schools Transportation Center SECURITY: Storage Server for Security Cameras 6/8/2009 Reed City Area Public Schools - Middle School SECURITY: Install Security Cameras in Middle School 6/8/2009 Reed City Area Public Schools - Norman SECURITY: Install Security Cameras in Elementary Elementary School 6/8/2009 ENERGY SAVINGS: Install energy efficient lighting and Reed City Area Public Schools Middle School control panel in gym 6/1/2010 ENERGY SAVINGS: Replace Media Center Air Handling unit and 6/1/2010 Reed City Area Public Schools Middle School add Air Conditioning

Reed City

Reed City Area Public Schools Middle School Replace carpet in Middle School - hallways and classrooms

6/1/2010

8/1/2010

$

98,000

Reed City

40' addition to High School Gym

4/5/2010

12/30/2010

$

960,000

Boiler replacement

None Set

None Set

$

252,000

Richfield Township

Reed City Area Public Schools- High School Davison Community Schools - Siple Elementary School Davison Community Schools - Siple Elementary School

Roof replacement

None Set

None Set

$

391,000

Richmond

Richmond Community Schools

Middle School Security Entrance

7/1/2009

9/30/2009

$

125,000

Richmond

Richmond Community Schools

Lee Elementary Door Window Replacement

7/1/2009

9/30/2009

$

200,000

Richmond

Richmond Community Schools

Middle School Carpet Replacement

7/1/2009

9/30/2009

$

205,000

Richmond Community Schools

High School Window/Door Replacement

7/1/2009

10/31/2009

$

336,000

Richmond Community Schools

Lee Elementary Masonry Restoration

7/1/2009

9/30/2009

$

450,000

Richmond Community Schools

Middle School Roof Replacement

10/1/2009

11/30/2009

$

944,000

Richmond Community Schools

Lee Elementary Security Entrance

6/15/2009

8/15/2009

$

40,000

Richmond Community Schools

High School Securtiy Entrance

7/1/2009

9/1/2009

$

50,000

Richmond

Richmond Community Schools

Lee Elementary Computer Replacement

7/1/2009

9/1/2009

$

130,000

Richmond

Richmond Community Schools

High School Computer Replacement

7/1/2009

9/1/2009

$

150,000

Reed City Reed City Reed City Reed City

A T

Reed City Reed City Reed City Reed City Reed City

Richfield Township

m b u

Richmond Richmond Richmond Richmond Richmond

02262009

S

Submitted Requests - Not Approved

O R

PP

O N

R d

e t t

it

st

e u

eq

s

7/24/2009 8/1/2009

Route (Infrastructure Only)

738 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools Richmond Community Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Richmond

Richmond Community Schools

Middle School Exterior Door Replacement

7/1/2009

9/30/2009

$

170,000

Richmond

Richmond Community Schools

Lee Elementary Roof Replacement

6/15/2009

8/15/2009

$

275,000

Richmond

Richmond Community Schools

High School Roof Replacement

6/15/2009

9/1/2009

$

280,000

Richmond

Richmond Community Schools

Middle School Kitchen Equipment Replacement

7/1/2009

9/1/2009

$

350,000

Richmond

Richmond Community Schools

Middle School Science Wing Addition-4 classrooms

12/1/2009

$

3,600,000

Richmond

Richmond Community Schools

High School Science Wing Addition-5 classrooms

12/1/2009

$

3,750,000

Riverview Community School District Riverview

Riverview Huntington

Emergency Light Fixtures

7/1/2009

8/31/2009

$

21,000

Riverview Community School District Riverview

Riverview Memorial

Occupancy Sensors

P P A

9/1/2010

7/1/2009

8/31/2009

$

22,000

Riverview Community School District Riverview

Riverview Forest

Emergency Light Fixtures

7/1/2009

8/31/2009

$

24,000

Riverview Community School District Riverview

Riverview Memorial

Emergency Light Fixtures

7/1/2009

8/31/2009

$

24,000

Riverview Community School District Riverview

Riverview Forest

Energy Efficient Urinals

7/1/2009

8/31/2009

$

40,000

Riverview Community School District Riverview

Riverview High School

Drinking Fountains

7/1/2009

8/31/2009

$

41,000

Riverview Community School District Riverview

Riverview Forest

Occupancy Sensors

7/1/2009

8/31/2009

$

45,000

Riverview Community School District Riverview

Riverview Seitz MS

Energy Efficient Urinals

7/1/2009

8/31/2009

$

50,000

Riverview Community School District Riverview

Riverview Seitz MS

Occupancy Sensors

7/1/2009

8/31/2009

$

55,000

Riverview Community School District Riverview

Riverview High School

Energy Efficient Urinals

7/1/2009

8/31/2009

$

86,000

Riverview Huntington

Energy Eff. Water Closets

7/1/2009

8/31/2009

$

98,000

Riverview Forest

Energy Eff. Water Closets

7/1/2009

8/31/2009

$

105,000

Riverview Community School District Riverview

Riverview Memorial

Energy Eff. Water Closets

7/1/2009

8/31/2009

$

157,000

Riverview Community School District Riverview

Riverview High School

Energy Eff. Water Closets

7/1/2009

8/31/2009

$

220,000

t i m

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

d e tt

S

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

O R 9/1/2010

D VE

Route (Infrastructure Only)

739 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Riverview Community School District Riverview

Riverview Forest

Door Hardware

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview Memorial

Water Main

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview Huntington

Water Main

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview Seitz MS

Door Hardware

7/1/2009

Riverview Community School District Riverview

Riverview Seitz MS

Emergency Light Fixtures

Riverview Community School District Riverview

Riverview Seitz MS

Drinking Fountains

Riverview Community School District Riverview

Riverview Forest

Exterior Tuckpointing

Riverview Community School District Riverview

Riverview Forest

Emergency Generator

Riverview Community School District Riverview

Riverview Huntington

Drinking Fountains

Riverview Community School District Riverview

Riverview Forest

Lavatories Remodeled

Riverview Community School District Riverview

Riverview Huntington

Riverview Community School District Riverview

Riverview Memorial

Riverview Community School District Riverview

Riverview Seitz MS

Riverview Community School District Riverview

Riverview Seitz MS

Funding Request

$

D VE

10,000

$

16,000

$

17,000

P P A

8/31/2009

$

27,000

7/1/2009

8/31/2009

$

30,000

7/1/2009

8/31/2009

$

35,000

7/1/2009

8/31/2009

$

35,000

7/1/2009

8/31/2009

$

50,000

7/1/2009

8/31/2009

$

62,000

7/1/2009

8/31/2009

$

68,000

Lavatories Remodeled

7/1/2009

8/31/2009

$

75,000

Drinking Fountains

7/1/2009

8/31/2009

$

88,000

Lavatories Remodeled

7/1/2009

8/31/2009

$

90,000

Concrete & Asphalt

7/1/2009

8/31/2009

$

100,000

Riverview Memorial

Concrete & Asphalt

7/1/2009

8/31/2009

$

120,000

Riverview High School

Exterior Tuckpointing

7/1/2009

8/31/2009

$

125,000

Riverview Community School District Riverview

Riverview Memorial

Lavatories Remodeled

7/1/2009

8/31/2009

$

126,000

Riverview Community School District Riverview

Riverview Forest

Concrete & Asphalt

7/1/2009

8/31/2009

$

130,000

t i m

ub

Riverview Community School District Riverview Riverview Community School District Riverview

02262009

d e tt

S

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

740 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Riverview Community School District Riverview

Riverview High School

Lavatories Remodeled

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview High School

Concrete & Asphalt

7/1/2009

8/31/2009

Riverview Community School District Riverview

Riverview Seitz MS

Emergency Generators

7/1/2009

8/31/2009

Mid Peninsula School District

remodeling, equipping and re-equipping and furnishing and re-furnishing the school building; acquiring and installing educational technology; constructing and equipping an addition to the school building; acquiring school buses; and developing and improving the site.

Romeo

Rockford Public Schools Romeo Community School / Croswell Elementary

erecting, furnishing and equipping additions to school facilities; partially remodeling furnishing and refurnishing, equipping and reequipping school facilities; acquiring, installing and equipping educational technology for school facilities; constructing, equipping, developing and improving community recreation, physical education and athletic facilities, playfields and play areas; purchasing school buses; and developing and improving sites. Upgrade / Replace HVAC systems and associated controls to achieve greater energy efficiency 12/1/2009

Romulus, MI

This project will allow the school district to fund needed updates to our aging security Romulus Community Schools Security System system at 10 locations. Upgrades will include video surveilance, emergency contact Upgrades system, keyless entry and buzzer entry systems. February, 2009

Mid Peninsula School District Rock

Rockford Public Schools Romeo Community Schools

Romulus Community Schools

Rockford

Romulus Community Schools Romulus, Michigan Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon

02262009

$

165,000

D VE $

180,000

$

260,000

$

1,935,000

$

45,805,000

4/1/2010

$

700,000

Fall-Winter, 2009

$

2,000,000

Immediately: February, 2009

Summer or Fall, 2009

$

16,000,000

6/1/2008

6/30/2008

$

1,500

Repair leak in wall & mold mildew damage

5/1/2008

5/31/2008

$

5,000

Replace damaged storage room floor

3/1/2008

3/31/2008

$

9,000

Sidewalk replacement

6/1/2008

6/30/2008

$

25,706

New roof

6/1/2008

7/31/2008

$

712,000

Bathroom Partitions

3/1/2008

3/31/2008

$

1,500

Replace Ceiling Tiles in Storage Room

3/1/2008

3/31/2008

$

2,500

Gerrish-Higgins Board of Education Office Renovate two restrooms Gerrish-Higgins School District (Roscommon High School) Accoustic upgrade for band-room

3/1/2008

3/31/2008

$

3,500

3/1/2008

3/30/2008

$

5,000

Gerrish-Higgins Board of Education Office Paint Gerrish-Higgins School District (Roscommon Middle School) Exhaust & Vent system in shop room area

2/1/2008

2/28/2008

$

5,000

3/1/2008

3/31/2008

$

10,000

2/1/2008

2/5/2008

$

15,000

3/1/2008

3/30/2008

$

20,000

T O

s t s

-N

tt i m

d e t

e u

q e R

Gerrish-Higgins Board of Education Office Gerrish-Higgins School District (Roscommon Middle School) Gerrish-Higgins School District (Roscommon Middle School) Gerrish-Higgins School District (Roscommon Middle School) Gerrish-Higgins School District (Roscommon Middle School) Gerrish-Higgins School District (Roscommon Middle School)

O R

P P A

This project would allow the district to pay for necessary roof repairs and Romulus Community Schools School Building replacements in a manner that is environmentally friendly. There are nine buildings Roof Repairs/Renovation that would benefit from this project. Gerrish-Higgins School District (Roscommon Middle School) Windows Replacement (3 classrooms)

ub

S

Funding Request

Gerrish-Higgins Bus Garage Heating System Gerrish-Higgins School District (Roscommon High School) Bathroom Upgrades

Submitted Requests - Not Approved

Route (Infrastructure Only)

741 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon Gerrish-Higgins School District Roscommon

Project Name Gerrish-Higgins School District (Roscommon Middle School) Painting Gerrish-Higgins School District (Roscommon Middle School) Carpeting replacement Gerrish-Higgins Board of Education Office Gerrish-Higgins School District (Roscommon Middle School) Gerrish-Higgins School District (Roscommon Elementary School) Gerrish-Higgins School District (Roscommon High School) Gerrish-Higgins School District (Roscommon Elementary School)

Project Description

Start Date

2/28/2008

$

20,000

3/1/2008

3/31/2008

$

25,700

Carpeting

2/1/2008

2/28/2008

$

46,250

Boiler Replacement

3/1/2008

3/15/2008

$

50,000

Painting

3/1/2008

$

70,000

Painting

2/1/2008

4/1/2008

$

90,000

Ceilings Replacement

3/1/2008

3/31/2008

$

136,500

5/1/2008

5/31/2008

$

150,000

2/1/2008

2/8/2008

$

262,000

6/12/2009

9/1/2009

$

30,000

5/1/2009

12/15/2009

$

5,000,000

$

40,455,000

A T

Fraser Public Schools Roseville

Oakland Schools

Oakland Schools-Technical Campus SE

Upgrades to a career and technical education facility replacing bldg infrastructure, lighting, plumbing, security, electrical, HVAC and upgrading labs

Saginaw Township Community Schools

Remodeling existing School District buildings, including energy conservation, climate control, safety and security improvements; constructing additions to existing School District buildings, including secure elementary and middle school entrances; acquiring and installing technology equipment in School District buildings, including classroom technology; improving and developing School District sites, including parking and outdoor athletic facilities and structures; and equipping and/or reequipping and furnishing and/or refurnishing School District Buildings.

Saginaw Township Community Schools

Saginaw

Funding Request

2/1/2008

Gerrish-Higgins Bus Garage Asphalt Gerrish-Higgins School District (Roscommon High School) Replace stained and mildew ceiling tiles Fraser Public Schools/ Dooley Early Childhood Center New Transformer Room to comply with electrical code

Royal Oak

Expected Completion Date

s

t s e

O N

PP

O R 4/15/2008

D VE

qu

e R

Replacement and new energy controls for all buildings. CO2 monitors will be added to the large spaces within the buildings to evaluate the need for fresh air to the space and provide energy savings. Occupancy sensors will be added to classrooms and common areas to automatically shutoff the lights after 10 minutes of inactivity. Interface occupancy sensors with HVAC system to further control heating of rooms when not in use. Replace old furnaces with energy efficient furnaces at Pleasant Ridge Elementary and Houghton Elementary. Replace domestic water and steam piping system at Liberty School to new energy efficient system. Original system is stil in place in the building from the 1940's. TBD

TBD

$

2,004,000

Sault Area Public Schools - Middle School

1970 roofing - Replace rubberized roof that is leaking.

June, 2009

August, 2009

$

350,000

Sault Area Public Schools - High School

1969 building - Remove and replace existing siding. Insulated metal panels (50,260 sq. ft.) and plaster soffits (8,840 sq. ft.) Assumptions are that materials are nonasbestos and disposal would be to a recycling center for scrap metal. Install security camera system. Upgrade technology infrastructure for wireless -district goal one-toone June, 2009

August, 2009

$

1,511,250

Schoolcraft Community Schools Schoolcraft

Schoolcraft Community Schools

Upgrade and improve energy efficiency of heating and lighting systems in selected District facilites as well as weather proof an attached mechanical support area.

4/1/2009

6/1/2009

$

100,000

Schoolcraft Community Schools Schoolcraft

Schoolcraft Community Schools Update

Upgrade and improve energy efficiency of heating and lighting systems in selected District facilites as well as weather proof an attached mechanical support area.

4/1/2009

6/1/2009

$

100,000

Saline Area Schools Sault Ste. Marie Area Schools

Sault Ste. Marie Area Schools

d e tt

Saline

b u S

Sault Ste. Marie

Sault Ste. Marie

02262009

t i m

Saline Area Schools - All Buildings

Submitted Requests - Not Approved

Route (Infrastructure Only)

742 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Schoolcraft Community Schools

Reshaping and adding to existing parking infrastructure through the use of recycled material. Project would include expanding parking areas adjacent to two instructural buildings to improve the safety and flow of both student and staff traffic, as well as, providing a covered canopy for the bus storage area. This facility would increase the safety of the drivers (slipping and falling hazards) and prolong the life of the busses by providing both some coverage from the weather. 4/1/2009

Schoolcraft Community Schools Parking Improvements

Reshaping and adding to existing parking infrastructure through the use of recycled material. Project would include expanding parking areas adjacent to two instructural buildings to improve the safety and flow of both student and staff traffic, as well as, providing a covered canopy for the bus storage area. This facility would increase the safety of the drivers (slipping and falling hazards) and prolong the life of the busses by providing both some coverage from the weather. 4/1/2009

Schoolcraft Community Schools

Reroof the HS instructional building.

Schoolcraft Community Schools Roof

Reroof the HS instructional building.

Washtenaw ISD-High Point School and Teaching & Learning Center

Renovation of roofing membranes on two campus buildings. Work consists of relapping all membrane seams and applying a reflective white sealer extending our current rubber membrane roof with a 10 year warranty while increasing our air conditioning energy savings.

Shelby Public Schools Shelby

Shelby/Thomas Read Elementary

New roof on part of Thomas Read Elementary

Shelby Public Schools Shelby

Shelby/Shelby High School

Replace network wiring with in the computer labs

Newaygo County Resa Sherman TWP

NC RESA Fremont Center

Replacement of exterior doors and windows to improve energy efficiency

5/1/2009

Newaygo County Resa Sherman TWP

NC RESA Educational Service Center

Replacement of exterior doors and windows to improve energy efficiency

6/1/2009

Newaygo County Resa Sherman TWP

NC RESA Career Tech Center

4/1/2009

Newaygo County Resa Sherman TWP

NC RESA Fremont Center

Newaygo County Resa Sherman TWP

NC RESA Educational Service Center

Newaygo County Resa Sherman TWP

NC RESA Career Tech Center

Replacement of exterior doors and windows to improve energy efficiency Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system Replace roofing membrane and insulation to improve efficiency with semi-intensive white reflective roofing system

Newaygo County Resa Sherman TWP

NC RESA Fremont Center

Schoolcraft Community Schools Schoolcraft

Schoolcraft Community Schools Schoolcraft Schoolcraft Community Schools Schoolcraft Schoolcraft Community Schools Schoolcraft

Washtenaw ISD

Scio Township

Newaygo County Resa Sherman TWP

S

Newaygo County Resa Sherman TWP

Newaygo County Resa Sherman TWP

02262009

eq

R d

D VE

125,000

6/1/2009

$

125,000

5/1/2009

6/1/2009

$

150,000

5/1/2009

6/1/2009

$

150,000

5/1/2009

7/1/2009

$

100,000

6/9/2009

8/9/2009

$

200,000

6/9/2009

8/9/2009

$

150,000

$

240,000

$

364,000

$

3,101,400

PP

O R

5/1/2011

5/1/2009

12/1/2009

$

80,000

5/1/2009

12/1/2009

$

364,000

5/1/2009

12/1/2009

$

1,033,800

Renovate classrooms to install technology for 21st Century Learning

5/1/2009

12/1/2010

$

260,000

NC RESA Educational Service Center

Renovate classrooms to install technology for 21st Century Learning

5/1/2009

12/1/2010

$

715,000

NC RESA Career Tech Center

12/1/2010

$

1,170,000

NC RESA Career Tech Center

Renovate classrooms to install technology for 21st Century Learning 5/1/2009 Construct a facility for storage of machinery for Building trades, heavy equipment and small engine repair

$

440,000

NC RESA FEAC

Addition for education space for Gross motor development instruction

$

625,000

e t t

it

m b u

Newaygo County Resa Sherman TWP

e u

st

O N

6/1/2009

Funding Request

$

A T

s

Expected Completion Date

Submitted Requests - Not Approved

Route (Infrastructure Only)

743 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Southfield Public School District Southfield Public School District

Southfield Public School District

Southfield Public School District

Southfield Public School District

Project Name

Project Description

Start Date

Southfield

Southfield Lathrup High School

Southfield

Southfield Public all district classrooms=700

Southfield-Lathrup high School cafeteria Expansion: Due to safety concerns and time on task, we will be expanding the North Cafeteria at Southfield –Lathrup High School so that the school can have a closed campus during the lunch hour. Currently, junior and seniors are allowed to go out for lunch because the school cafeterias cannot accommodate the entire students body during two lunch periods. The plan is to convert two large classrooms next to the North Cafeteria in lunch room space. In the renovation two walls will come down and flooring and ceiling work will be required. One of the classrooms is a tech lab and will be replaced in another part of the building. This will require installation of new data drops. 6/1/2009 Technology: repalce all existing monitors with flat screen energy efficient monitors with power management capabilities. 6/1/2009

Southfield

Southfield Public Mary Thompson Middle School

Thompson Middle School Chiller & Air Handling Equipment: The chiller that cools the air for the central (windowless) core of this school has failed and is beyond repair. The chiller was installed in 1970 and even if it could be repaired is no longer energy efficient. Further, the air handing units are original (1966) to the building and are coming to the natural end of their useful life. We have a contractors estimate of $277,000 for this work. 6/1/2009

Southfield

Thompson & Levy Middle School Loading Dock replacements: The concrete forming the drive, curbs, sidewalks and receiving areas of the Levey Middle School (built 1964) and Thompson Middle School (built 1966) have deteriorated to a point of needing total replacement. The concrete has sprawled and developed ever-widening Mary Thompson Middle School & Glenn Levy cracks due to Michigan weather. We can no longer patch the receiving areas of Middle School these two schools. 4/1/2009

Southfield

Remodel: update existing office space from divided rooms and workstations into open architecture to improve workflow for the administrative finance team. Project includes removal of walls, wall covering, flooring and workstation furniture. 1/1/2009

John W. English Administrative Center

Expected Completion Date

T O

P P A

O R

N s

t s e

8/1/2009

Funding Request

D VE $

130,000

6/1/2011

$

200,000

9/1/2009

$

277,000

7/1/2009

$

150,000

4/1/2009

$

75,000

9/1/2009

$

405,000

6/1/2011

$

4,700,000

6/1/2009

$

130,000

Route (Infrastructure Only)

u q e

Southfield Public School District Southfield Public School District Southfield Public School District

Southfield-Lathrup High School Floor & Ceiling Replacements: Southfield-Lathrup High School was constructed between 1966 and 1970. Many of the classrooms have original floor tiles and ceiling tiles. The floor replacement would require asbestos abatement. We have 45 classrooms in need of new floors. The approximate cost to abate and replace the floor in each classroom is $5,000 per room. Ceilings replacement would include suspension grids and tiles. Approximate cost per classroom ceiling replacement is $4,000. The cost must include re-hanging light fixtures as code has changed lights must now be hung separately from the ceiling grid. Total cost for ceilings and lights is $405,000. 6/1/2009

e t t

R d

Southfield

Southfield-Lathrup H.S.

Southfield

Southfield Public all district classrooms=700 Southfield Public Southfield Regional Academic Campus

Instructional Technology: install audio enhancement (sound field) and data projector per classroom to fully integrate technology in the learning process. 6/1/2009 SRAC-remodeling: remodel current existing office space and locker bay areas into six (6) additional classrooms. 3/1/2009

Southfield Public John W. English Administrative Center

Generator: install self contained generator to power the administartive an attached support service buildings for times whenthey experience total power supply loss.

4/1/2009

6/1/2009

$

240,000

Sparta - Ridgeview

Laundry room hook up, equipment purchased

7/1/2009

9/1/2009

$

1,200

it

Southfield

u S

bm

Southfield Public School District

Southfield

Sparta Area Schools

Sparta

Sparta Area Schools

Sparta

Sparta - Ridgeview

Get Green - dryers w/sensors, automatic low flush toilets

7/1/2009

9/1/2009

$

10,000

Sparta Area Schools

Sparta

Sparta - Englishville

New windows and doors for entire building

7/1/2009

9/1/2009

$

10,000

Sparta Area Schools

Sparta

Sparta - Englishville

upgrade insulation/weatherization

7/1/2009

9/1/2009

$

17,000

02262009

Submitted Requests - Not Approved

744 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Sparta Area Schools

Sparta

Sparta - White

Asbestos removal

7/1/2009

9/1/2009

$

20,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

Update landscaping

7/1/2009

9/1/2009

$

20,000

Sparta Area Schools

Sparta

Sparta - Appleview

Upgrade bathrooms - go green

7/1/2009

9/1/2009

$

30,000

Sparta Area Schools

Sparta

Sparta - Appleview

Replace exterior and interior doors to bring to code

7/1/2009

9/1/2009

$

35,000

Sparta Area Schools

Sparta

Sparta - Appleview

HVAC Completion for entire building

7/1/2009

$

50,000

Sparta Area Schools

Sparta

Sparta - Middle School

Replace exterior doors

7/1/2009

9/1/2009

$

50,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

Window replacement throughout building

7/1/2009

9/1/2009

$

50,000

Sparta Area Schools

Sparta

Sparta - Middle School

Renovate bathrooms - go green, auto flush toilets, sensors

7/1/2009

9/1/2009

$

65,000

Sparta Area Schools

Sparta

Sparta - Appleview

Window replacement

7/1/2009

9/1/2009

$

75,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

update HVAC system

7/1/2009

9/1/2009

Sparta Area Schools

Sparta

Sparta - Ridgeview

replace block wall in media center

7/1/2009

9/1/2009

$

5,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

Fence in play area

7/1/2009

9/1/2009

$

8,000

Sparta Area Schools

Sparta

Sparta - High School

Survelliance cameras

7/1/2009

9/1/2009

$

8,000

Sparta Area Schools

Sparta

Sparta - White

New carpet throughout building

7/1/2009

9/1/2009

$

10,000

Sparta Area Schools

Sparta

Sparta - White

Rooftop unit for cooling

7/1/2009

9/1/2009

$

12,000

Sparta Area Schools

Sparta

Sparta - Middle School

New clock system

7/1/2009

9/1/2009

$

15,000

Sparta Area Schools

Sparta

Sparta - White

Paint interior of building

7/1/2009

9/1/2009

$

15,000

Sparta Area Schools

Sparta

Sparta - Englishville

Replace gym lighting, add survelliance cameras

7/1/2009

9/1/2009

$

15,000

Sparta Area Schools

Sparta

Sparta - Appleview

Survelliance cameras

7/1/2009

9/1/2009

$

15,000

Sparta Area Schools

Sparta

Sparta - Middle School

Replace PA system

7/1/2009

9/1/2009

$

17,000

Sparta Area Schools

Sparta

Sparta - Middle School

Survelliance cameras

7/1/2009

9/1/2009

$

18,000

Sparta Area Schools

Sparta

Sparta - Appleview

Replace clock system

7/1/2009

9/1/2009

$

20,000

Sparta Area Schools

Sparta

Sparta - Englishville

Replace leaking roof

7/1/2009

9/1/2009

$

20,000

Sparta Area Schools

Sparta

Sparta - Myers Bldg

Replace roof

7/1/2009

9/1/2009

$

20,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

Exterior update to siding/design/soffit

7/1/2009

9/1/2009

$

25,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

enclose media center

7/1/2009

9/1/2009

$

30,000

Sparta Area Schools

Sparta

Sparta - White

New tile

7/1/2009

9/1/2009

$

35,000

02262009

S

m b u

O N

R d

e t t

it

st

e u

eq

s

A T

Submitted Requests - Not Approved

PP

O R 9/1/2009

D VE

Route (Infrastructure Only)

745 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Sparta Area Schools

Sparta

Sparta - Ridgeview

repave and extend sidwalks around building

7/1/2009

9/1/2009

$

40,000

Sparta Area Schools

Sparta

Sparta - District Needs

Upgrade field house facilities

7/1/2009

9/1/2009

$

40,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

Cement replacement

7/1/2009

9/1/2009

$

45,000

Sparta Area Schools

Sparta

Sparta - Middle School

Replace boiler

7/1/2009

9/1/2009

$

55,000

Sparta Area Schools

Sparta

Sparta - District Needs

Construct storage facility

7/1/2009

$

80,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

Replace out of code playground equipment

7/1/2009

$

80,000

Sparta Area Schools

Sparta

Sparta - Middle School

New Lockers

7/1/2009

9/1/2009

$

85,000

Sparta Area Schools

Sparta

Sparta - District Needs

Widing of district roadways, entryways

PP

9/1/2009

7/1/2009

9/1/2009

$

150,000

Sparta Area Schools

Sparta

Sparta - Ridgeview

New roof/insulation

7/1/2009

9/1/2009

$

275,000

Lake Shore Public Schools (Macomb)

erecting, furnishing and equipping additions to and partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping instructional technology for school facilities; improving and equipping existing playgrounds; and developing and improving sites.

$

9,700,000

$

10,900,000

Lake Shore Public Schools (Macomb)

St. Clair Shores

s

t s e

A T

O N

remodeling, re-equipping, re-furnishing school buildings, athletic facilities and other facilities and preparing, developing and improving sites at school buildings, athletic facilities and playgrounds; erecting, equipping and furnishing additions to school buildings and preparing, developing and improving sites for additions to school buildings; erecting, equipping and furnishing athletic facilities and improving sites for athletic facilities; and equipping and re-equipping school buildings for technology systems and equipment and purchasing school buses.

qu

South Lake Schools St. Clair Shores Gerrish-Higgins School District St. Helen Gerrish-Higgins School District St. Helen Gerrish-Higgins School District St. Helen Gerrish-Higgins School District St. Helen Gerrish-Higgins School District St. Helen Gerrish-Higgins School District St. Helen

South Lake Schools Gerrish-Higgins School District (St. Helen Elementary School) Gerrish-Higgins School District (St. Helen Elementary School) Gerrish-Higgins School District (St. Helen Elementary School) Gerrish-Higgins School District (St. Helen Elementary School) Gerrish-Higgins School District (St. Helen Elementary School) Gerrish-Higgins School District (St. Helen Elementary School)

St. Johns Public Schools St. Johns Public Schools

St. Johns

Install surface area that improves drainage and controls suface water runoff. Expand Bus servicing building to provide work area for servicing 3 adjacent school district's busses (Dewitt, Pewamo-Westphalia and Fowler) to assist in local area's efforts for St. Johns Public Schools - Operations Building collaboration and shared resources. Upgrade Technology 7/1/2009 Replace Masonry & Stoop at Main Entrance, Replace Roof, Replace flooring, install St. Johns Public Schools - Middle School security upgrades, upgrade technology 7/1/2009

St. Johns

St. Johns Public Schools - Oakview Elementary

St. Johns Public Schools

St. Johns

02262009

tt i m

d e t

b u S

O R 9/1/2009

D VE

e R

Ceiling Replacement

6/1/2008

7/15/2008

$

69,000

Roof Replacement

6/1/2008

6/30/2008

$

227,625

Replace broken brick

3/1/2008

3/31/2008

$

1,000

Replacement sidings

4/1/2008

4/30/2008

$

2,000

Sink & cabinets replacement in classrooms

3/1/2008

3/31/2008

$

20,000

Bathroom Renovation

3/1/2008

3/31/2008

$

29,500

Oct.1, 2009

$

760,428

Oct.1, 2009

$

1,541,910

Oct.1, 2009

$

3,011,220

Construct 8 new classroooms, remodel new classrooms, furnish, upgrade technology needed to meet full day, everyday kindergarten requirement, deal with Elementary class size issues, and meet NCLB and state of Michigan curriculum requirements 7/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

746 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Johns Public Schools

St. Johns Public Schools

St. Johns Public Schools St. Joseph Public Schools Stanton Township Public Schools Stanton Township Public Schools Stanton Township Public Schools Stanton Township Public Schools Stanton Township Public Schools Stephenson Area Public Schools Macomb ISD Macomb ISD Macomb ISD Macomb ISD Macomb ISD Macomb ISD Utica Community Schools

Project Name

Project Description

Start Date

St. Johns Public Schools - Gateway Elementary

Construct 8 new classroooms, remodel new classrooms, furnish, upgrade technology needed to meet full day, everyday kindergarten requirement, deal with Elementary class size issues, and meet NCLB and state of Michigan curriculum requirements 7/1/2009

St. Johns Public Schools - New Elementary

Construct new classroooms for a new Elementary and pre-school building. Included in building are rooms for Special Education, Media Center, Art, Music, Cafeteria/Kitchen, Administration. Costs include furnishings and Instructional Technology. The building is a replacement for 4 rural elementaries, which buildings will be closed. The new construction will result in efficiencies in energy consumption, staffing and operating supplies by centralizing all school buildings. 7/1/2009

St. Johns

St. Johns Public Schools - High School

New: Classroom additions with furnishings; entrance; additions to cafeteria. Upgrades for: mechanical and electrical; temperature constrol system; security system; technology. Remodel of spaces: existing classrooms; existing cafeteria; music rooms; auditorium; media center; restrooms.

St. Joseph

SJPS

Buses

Stanton Township

Stanton Township Public Schools

replace existing boiler with a new high efficiency boiler and remove the old fuel oil tank6/1/2009

Stanton Township

Stanton Township Public Schools

provide new classroom lock sets and office to classroom communication system

Stanton Township

Stanton Township Public Schools

Stanton Township

St. Johns

Expected Completion Date

$

3,060,365

Oct.1, 2009

$

15,621,474

Dec.31, 2010

$

30,975,250

$

360,000

9/30/2009

$

75,000

6/1/2009

9/30/2009

$

32,000

provide classrooms and administration computers and networking equipment

6/1/2009

9/30/2009

$

45,000

Stanton Township Public Schools

replace membrane roofing

6/1/2009

9/30/2009

$

80,000

Stanton Township

Stanton Township Public Schools

resurface parking lot, provide better drainage

6/1/2009

9/30/2009

$

110,000

Stephenson Sterling Heights Sterling Heights Sterling Heights Sterling Heights Sterling Heights Sterling Heights

Stephenson Area Public Schools-Energy Efficiency Upgrades Maple Lane Schoo Bozymowski Center Bozymowski Center Bozymowski Center Maple Lane Schoo Bozymowski Center

Install energy recovery ventilators on heating system in Elementary and High School ($100,000), expand EMS controls ($50,000) and roofing improvements ($250,000) 5/1/2009 Replace windows with energy efficient type Repair storm drains. Replace Boilers with energy efficient type Replace unit vents and controls with energy efficient type D.D.C. controls Replace boilers, HVAC system and controls with energy efficient type. Remove asbestos containing floor and ceiling tile and replace.

8/1/2009 8/10/2009 9/9/2009 8/10/2009 8/10/2009 8/10/2009 8/10/2009

$ $ $ $ $ $ $

400,000 1,000,000 40,000 150,000 250,000 600,000 210,000

Sterling Heights

Utica Community Schools

Driveway and Parking lot paving

June '09

August '09

$

600,000

Sturgis Public Schools Arden Park School

Replace windows and repair exterior walls.

6/1/2009

7/1/2009

$

20,000

Sturgis Public Schools Central Commons

Demolition of coal room and outdated auto shop garage.

6/15/2009

8/1/2009

$

100,000

Sturgis Public Schools Park Elementary

School consists of 4 classrooms, central office area, 2 small offices and 2 toilet rooms. Need to remove and replace existing steam boiler with new hot water high efficiency boilers. Replace the radiator systems with horizontal unit ventilators.

6/15/2009

9/1/2009

$

178,500

Sturgis Public Schools Jerolene Elementary

School consists of 4 classrooms, central office area, 2 small offices and 2 toilet rooms. Need to remove and replace existing steam boiler with new hot water high efficiency boilers. Replace the radiator systems with horizontal unit ventilators.

6/15/2009

9/1/2009

$

178,500

St. Johns

Sturgis Public Schools Sturgis Sturgis Public Schools Sturgis

Sturgis Public Schools Sturgis

Sturgis Public Schools Sturgis

02262009

d e tt

T O

b u S

-N

Submitted Requests - Not Approved

O R

P P A

e u

q e R

t i m

s t s

Oct.1, 2009

Funding Request

8/1/2009

Route (Infrastructure Only)

D VE

747 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sturgis Public Schools Jackson Public Schools Jackson Public Schools Jackson Public Schools

Tawas Area Schools

Tawas Area Schools

Project Name

Project Description

Start Date

Sturgis

Sturgis Public Schools Central Commons

Classrooms: Second floor classrooms need new vertical unit ventilators and casework renovations. Additional heat needed in corridors. Building Renovation: Provide new hot water heat air handling unit to supply heating and ventilation to the existing gymnasium space. Provide new steam to hot water heat exchanger in boiler room with new piping loop. Provide new heating & ventilation in the locker rooms. Provide heat to the existing rooms adjacent to the gymnasium areas. 6/15/2009

Summit Township

JPS Dibble Elementary

Roof replacement

6/1/2009

Summit Township

JPS Dibble Elementary

Replace classroom ceilings

6/1/2009

Summit Township

JPS Dibble Elementary

Replace asbestos flooring

Tawas

Tawas Schools

Tawas

$

54,693

$

82,503

11/30/2009

$

27,810

Locker Room renovations to be in compliance with Title IX including low flow faucets, electric hand dryers and energy efficient lighting and mechanical systems. 6/10/2009

9/1/2009

$

125,000

Tawas Schools

Science room renovations including low flow faucets, energy efficient lighting and mechanical systems. Technology upgrade with state of the art lab stations to be installed.

6/10/2009

9/1/2009

$

400,000

4/11/2009 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

8/28/2009

$

1,986,600

2009

$

2,000

2009

$

3,000

8/16/2009

$

3,000

2009

$

4,000

2009

$

5,000

8/16/2010

$

5,000

2009

$

5,000

2009

$

5,000

2009

$

5,000

2009

$

5,000

2009

$

5,000

2009

$

8,000

2009

$

8,000

2009

$

8,000

8/16/2009

$

10,000

T O

N s

Tawas City

Iosco RESA Jobs Creation & Preservation

Taylor School District

Taylor

Taylor - Kinyon Elementary

Swipe Card System

Taylor School District

Taylor

Taylor - Hoover Middle School

Swipe Card System

Taylor School District

Taylor

Taylor - Myers Elementary

Taylor School District

Taylor

Taylor - Johnson Elementary

Taylor School District

Taylor

Taylor - McDowell Elementary

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Taylor School District

Taylor

Taylor - Fischer Elementary

Swipe Card System

Taylor School District

Taylor

Taylor - Holland Elementary

Swipe Card System

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

tt i m

d e t

ub

st

e u

q e R

Swipe Card System

Asbestos Removal

Asbestos Removal

Swipe Card System

Taylor - Johnson Elementary

Swipe Card System

Taylor - Randall Elementary

Swipe Card System

Taylor - Taylor Parks Elementary

Swipe Card System

Taylor - 6th Grade Academy

Swipe Card System

Taylor

Taylor - Titan Alternative Educational

Swipe Card System

Taylor School District

Taylor

Taylor - West Middle School

Swipe Card System - Upgrade

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Asbestos Removal

02262009

Submitted Requests - Not Approved

O R

P P A

Iosco Resa

9/30/2009

D VE

403,000

6/1/2009

9/1/2009

Funding Request

$

Expand Career and Tech Training Center to accommodate students and adults to meet employer demand for skilled employees. Mechanic training, training for production of composite materials, building trades, installation & maintenance of geothermal, wind, solar, and biomass alternative energy systems. Green energy production. Add space for culinary arts and education of special needs children.

S

Expected Completion Date

12/31/2009

Route (Infrastructure Only)

748 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - Fischer Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Holland Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Hoover Middle School

Asbestos Removal

Taylor School District

Taylor

Taylor - Kinyon Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Moody Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Myers Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Randall Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Johnson Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Career Center

Swipe Card System

Taylor School District

Taylor

Taylor - Kennedy High School

Swipe Card System

Taylor School District

Taylor

Taylor - Truman High School

Swipe Card System

Taylor School District

Taylor

Taylor - Kennedy High School

Greenhouse - Room #102

Taylor School District

Taylor

Taylor - McDowell Elementary

Black Top Replacement

Taylor School District

Taylor

Taylor - Myers Elementary

Black Top Replacement Play Area

Taylor School District

Taylor

Taylor - Randall Elementary

Taylor School District

Taylor

Taylor - Johnson Elementary

Taylor School District

Taylor

Taylor - Fischer Elementary

Taylor School District

Taylor

Taylor - Career Center

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

m b u

Black Top Replacement Play Area Doors Roof Replacement - Green Building Surveillance

Taylor - Eureka Heights Elementary

Building Surveillance

Taylor - Fischer Elementary

Building Surveillance

Taylor - Holland Elementary

Building Surveillance

Taylor - Johnson Elementary

Building Surveillance

Taylor - Kinyon Elementary

Building Surveillance

Taylor

Taylor - McDowell Elementary

Building Surveillance

Taylor

Taylor - Moody Elementary

Building Surveillance

02262009

S

st

s

O N

R d

e t t

it

A T

e u

eq

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date

30 Days 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

2009

$

10,000

8/20/2009

$

10,000

$

10,000

$

10,000

$

10,000

8/10/2009

$

10,000

2010

$

10,000

2009

$

10,000

2011

$

10,000

2011

$

10,000

2009

$

10,000

2009

$

10,000

2009

$

10,000

2011

$

12,000

2009

$

15,000

8/22/2009

$

15,000

2009

$

15,000

2009

$

15,000

2011

$

16,340

2011

$

17,000

2011

$

17,000

2009

$

17,000

2011

$

17,000

2009

$

17,000

2011

$

17,000

2010

$

17,000

2011

$

17,000

2010 2009

O R

PP

Funding Request

8/24/2009

D VE

Route (Infrastructure Only)

749 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - Myers Elementary

Building Surveillance

Taylor School District

Taylor

Taylor - Randall Elementary

Building Surveillance

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Building Surveillance

Taylor School District

Taylor

Taylor - 6th Grade Academy

Asbestos Removal

Taylor School District

Taylor

Taylor - Career Center

Asbestos Removal

Taylor School District

Taylor

Taylor - Kennedy High School

Asbestos Removal

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Asbestos Removal

Taylor School District

Taylor

Taylor - Truman High School

Asbestos Removal

Taylor School District

Taylor

Taylor - Moody Elementary

Black Top Drive Replacement

Taylor School District

Taylor

Taylor - Holland Elementary

Black Top Replacement Play Area

Taylor School District

Taylor

Taylor - Fischer Elementary

Black Top Replacement Side Drive

Taylor School District

Taylor

Taylor - Hoover Middle School

Building Surveillance

Taylor School District

Taylor

Taylor - West Middle School

Building Surveillance

Taylor School District

Taylor

Taylor - Myers Elementary

Doors

Taylor School District

Taylor

Taylor - Kinyon Elementary

Kitchen - Replace Serving Wells & Counters

Taylor School District

Taylor

Taylor - Moody Elementary

Upgrade Kitchen

Taylor School District

Taylor

Taylor - 6th Grade Academy

Taylor School District

Taylor

Taylor - Kennedy High School

Taylor School District

Taylor

Taylor - Truman High School

Taylor School District

Taylor

Taylor - Moody Elementary

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

m b u

s

Black Top Circle Drive Replacement

Building Surveillance Building Surveillance Doors

Taylor - West Middle School

Doors

Taylor - Hoover Middle School

Kitchen - Replace Seving Wells & Counters

Taylor - McDowell Elementary

Lighting Replacement

Taylor - Career Center

Windows

Taylor - Kinyon Elementary

Doors

Taylor

Taylor - Randall Elementary

Doors

Taylor

Taylor - Myers Elementary

Kitchen - Replace Serving Wells & Counter

02262009

S

O N

R d

e t t

it

eq

A T

st

e u

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date 2011

$

17,000

2011

$

17,000

$

17,000

$

20,000

$

20,000

2010

$

20,000

2010

$

20,000

2010

$

20,000

8/24/2009

$

20,000

2009

$

20,000

2009

$

20,000

2009

$

20,000

2010

$

20,000

8/10/2009

$

20,000

2011

$

20,000

2011

$

23,000

2009

$

25,000

2010

$

25,000

2011

$

25,000

8/24/2009

$

25,000

2009

$

25,000

2011

$

25,000

2010

$

25,000

2010

$

25,000

2009

$

27,000

2009

$

30,000

2011

$

30,000

2011 2009

O R

PP

Funding Request

2010

D VE

Route (Infrastructure Only)

750 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - McDowell Elementary

Kitchen - Replace Serving Wells & Purchase a Mixer

Taylor School District

Taylor

Taylor - Fischer Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Johnson Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Kinyon Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Truman High School

Pool System Repairs

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Replace Air Handlers

Taylor School District

Taylor

Taylor - Holland Elementary

Replace Air Handlers

Taylor School District

Taylor

Taylor - Moody Elementary

Replace Air Handlers

Taylor School District

Taylor

Taylor - McDowell Elementary

Doors

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Unit Vents

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Holland Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Moody Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Myers Elementary

Lighting Replacement

Taylor School District

Taylor

Taylor - Kennedy High School

Pool System Repair

Taylor School District

Taylor

Taylor - 6th Grade Academy

Taylor School District

Taylor

Taylor - Career Center

Taylor School District

Taylor

Taylor - Hoover Middle School

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

m b u

Replace Air Handlers

Replace Air Handlers

Replace Air Handlers

Replace Air Handlers

Taylor - West Middle School

Replace Air Handlers

Taylor - Kinyon Elementary

Replace Asbestos Tile

Taylor - Fischer Elementary

Drop Ceilings

Taylor - Kinyon Elementary

Drop Ceilings

Taylor - Moody Elementary

Drop Ceilings

Taylor

Taylor - Randall Elementary

Lighting Replacement

Taylor

Taylor - Holland Elementary

Plumbing Upgrade

02262009

S

st

s

O N

R d

e t t

it

A T

e u

eq

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date 2011

$

30,000

2010

$

30,000

$

30,000

$

30,000

$

30,000

2011

$

30,000

8/16/2010

$

30,000

2011

$

30,000

2011

$

30,000

2009

$

35,000

2011

$

35,000

8/11/2011

$

40,000

2010

$

40,000

2011

$

40,000

8/10/2009

$

40,000

2011

$

40,000

2011

$

40,000

2009

$

40,000

2010

$

40,000

2011

$

40,000

2010

$

40,000

2011

$

40,000

2010

$

45,000

2010

$

45,000

2011

$

45,000

2010

$

45,000

2011

$

45,000

2010 2010

O R

PP

Funding Request

2010

D VE

Route (Infrastructure Only)

751 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - Myers Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Kinyon Elementary

Black Top Replacement

Taylor School District

Taylor

Taylor - Career Center

Doors

Taylor School District

Taylor

Taylor - Kennedy High School

Doors

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Drop Ceilings

Taylor School District

Taylor

Taylor - Randall Elementary

Kitchen - Replace Ovens, Dishwasher & Serving Counters

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Kitchen - Replace Serving Wells & Counters

Taylor School District

Taylor

Taylor - 6th Grade Academy

Lighting Replacement

Taylor School District

Taylor

Taylor - Hoover Middle School

Lighting Replacement

Taylor School District

Taylor

Taylor - West Middle School

Parking Lot Replacement

Taylor School District

Taylor

Taylor - Fischer Elementary

Re-open to Finishing Kitchen

Taylor School District

Taylor

Taylor - Truman High School

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Johnson Elementary

Windows

Taylor School District

Taylor

Taylor - McDowell Elementary

Windows

Taylor School District

Taylor

Taylor - Hoover Middle School

Drop Ceilings

Taylor School District

Taylor

Taylor - Johnson Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Randall Elementary

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Moody Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Holland Elementary

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

m b u

st

s

O N

R d

e t t

it

A T

e u

eq

Drop Ceilings

Doors

Taylor - 6th Grade Academy

Kitchen - Replace Serving Wells, Counters, Built-in Warmer, Refrigerators & Oven

Taylor - Kinyon Elementary

Plumbing Upgrade

Taylor - McDowell Elementary

Plumbing Upgrade

Taylor - Truman High School

Replace Air Handlers

Taylor - Eureka Heights Elementary

Windows

Taylor

Taylor - Fischer Elementary

Windows

Taylor

Taylor - Moody Elementary

Windows

02262009

S

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date 8/10/2011

$

45,000

2009

$

50,000

$

50,000

$

50,000

$

50,000

2011

$

50,000

2011

$

50,000

2010

$

50,000

2010

$

50,000

2009

$

50,000

2011

$

50,000

2011

$

50,000

2009

$

50,000

2011

$

50,000

2010

$

55,000

2010

$

55,000

2010

$

55,000

8/10/2010

$

55,000

2011

$

55,000

2009

$

60,000

2011

$

60,000

2011

$

60,000

2011

$

60,000

2011

$

60,000

10/15/2009

$

60,000

2009

$

60,000

2011

$

60,000

2010 2009

O R

PP

Funding Request

2011

D VE

Route (Infrastructure Only)

752 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - Myers Elementary

Windows

Taylor School District

Taylor

Taylor - Randall Elementary

Windows

Taylor School District

Taylor

Taylor - West Middle School

Asbestos Removal

Taylor School District

Taylor

Taylor - 6th Grade Academy

Doors

Taylor School District

Taylor

Taylor - Hoover Middle School

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Truman High School

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Moody Elementary

Re-open to a FULL Service Kitchen

Taylor School District

Taylor

Taylor - Johnson Elementary

Black Top Add on for Safety Issues

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Doors

Taylor School District

Taylor

Taylor - 6th Grade Academy

Drop Ceilings

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Holland Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - McDowell Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Myers Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Career Center

Taylor School District

Taylor

Taylor - Fischer Elementary

Taylor School District

Taylor

Taylor - Kinyon Elementary

Taylor School District

Taylor

Taylor - West Middle School

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

m b u

Lighting Replacement

Replace Asbestos Tile

Unit Vents

Unit Vents

Taylor - Hoover Middle School

Windows

Taylor - Randall Elementary

Plumbing Upgrade

Taylor - Taylor Parks Elementary

Windows

Taylor - Kennedy High School

Physics Lab - Room #130

Taylor - Truman High School

Doors

Taylor

Taylor - Taylor Parks Elementary

Roof Replacement - Green

Taylor

Taylor - Myers Elementary

Boiler Replacement

02262009

S

s

O N

R d

e t t

it

eq

A T

st

e u

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date

30 Days 120 days from approval

8/10/2011

$

60,000

2011

$

60,000

$

65,000

$

65,000

$

65,000

2011

$

65,000

2011

$

65,000

2011

$

70,000

2009

$

75,000

2009

$

75,000

2010

$

75,000

8/16/2010

$

75,000

2010

$

75,000

2010

$

75,000

8/10/2009

$

75,000

2010

$

75,000

2011

$

75,000

2011

$

75,000

2011

$

75,000

2010

$

75,000

2010

$

75,000

2011

$

80,000

2011

$

80,000

2011

$

87,155

2011

$

88,000

2011

$

97,935

9/30/2009

$

100,000

2011 2009

O R

PP

Funding Request

2011

D VE

Route (Infrastructure Only)

753 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - Kennedy High School

Lighting Replacement

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Lighting Replacement

Taylor School District

Taylor

Taylor - Truman High School

Lighting Replacement

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Holland Elementary

Unit Vents

Taylor School District

Taylor

Taylor - McDowell Elementary

Unit Vents

Taylor School District

Taylor

Taylor - 6th Grade Academy

Windows

Taylor School District

Taylor

Taylor - Hoover Middle School

Doors

Taylor School District

Taylor

Taylor - Kennedy High School

Elevator

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Elevator

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Elevator for ADA Compliance

Taylor School District

Taylor

Taylor - 6th Grade Academy

Electrical Upgrade

Taylor School District

Taylor

Taylor - Career Center

Electrical Upgrade

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Electrical Upgrade

Taylor School District

Taylor

Taylor - Fischer Elementary

Electrical Upgrade

Taylor School District

Taylor

Taylor - Holland Elementary

Electrical Upgrade

Taylor School District

Taylor

Taylor - Hoover Middle School

Taylor School District

Taylor

Taylor - Johnson Elementary

Taylor School District

Taylor

Taylor - Kennedy High School

Taylor School District

Taylor

Taylor - Kinyon Elementary

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

it

m b u

A T

e u

eq

Electrical Upgrade Electrical Upgrade

Electrical Upgrade Electrical Upgrade

Taylor - McDowell Elementary

Electrical Upgrade

Taylor - Moody Elementary

Electrical Upgrade

Taylor - Myers Elementary

Electrical Upgrade

Taylor - Randall Elementary

Electrical Upgrade

Taylor - Taylor Parks Elementary

Electrical Upgrade

Taylor

Taylor - Titan Alternative Educational

Electrical Upgrade

Taylor

Taylor - Truman High School

Electrical Upgrade

02262009

S

st

s

O N

R d

e t t

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date 2011

$

100,000

2011

$

100,000

$

100,000

$

100,000

$

100,000

2011

$

100,000

2010

$

100,000

2009

$

110,000

2009

$

110,000

2009

$

110,000

2010

$

110,000

2011

$

120,000

2011

$

120,000

8/16/2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

8/10/2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011

$

120,000

2011 8/16/2010

O R

PP

Funding Request

2011

D VE

Route (Infrastructure Only)

754 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Taylor - Truman High School

Complete Re-model Kitchen

Taylor - Taylor Parks Elementary

Replace Asbestos Tile

Taylor - Truman High School

Boiler Replacement

Taylor - Kennedy High School

Parking Lot Replacement

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Taylor - Moody Elementary

Roof Replacement - Green

30 Days

2011

$

203,270

Taylor

Taylor - Randall Elementary

Roof Replacement - Green

2011

$

246,185

Taylor

Taylor - Kennedy High School

Biology Labs - Rooms 102, 132 & 134

30 Days 120 days from approval

2011

$

285,355

Taylor School District

Taylor

Taylor - West Middle School

Electrical Upgrade

Taylor School District

Taylor

Taylor - Hoover Middle School

Boiler Replacement

Taylor School District

Taylor

Taylor - Holland Elementary

Chiller Replacement

Taylor School District

Taylor

Taylor - McDowell Elementary

Chiller Replacement

Taylor School District

Taylor

Taylor - Career Center

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Johnson Elementary

Unit Vents

Taylor School District

Taylor

Taylor - Moody Elementary

Unit Vents

Taylor School District

Taylor

Taylor - Randall Elementary

Unit Vents

Taylor School District

Taylor

Taylor - Kennedy High School

Science Labs - 2 Rooms

Taylor School District

Taylor

Taylor - Truman High School

Science Labs (2 Rooms)

Taylor School District

Taylor

Taylor - Kennedy High School

Complete Re-model Kitchen

Taylor School District

Taylor

Taylor - Truman High School

Drop Ceilings

Taylor School District

Taylor

Taylor - 6th Grade Academy

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Johnson Elementary

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Moody Elementary

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Randall Elementary

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Replace Asbestos Tile

Taylor School District

Taylor

Taylor - Career Center

Unit Vents

Taylor School District

Taylor

Taylor - Hoover Middle School

Taylor School District

Taylor

Taylor - West Middle School

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

02262009

S

m b u

eq

s

st

e u

O N

R d

e t t

it

A T

Unit Vents Windows

Submitted Requests - Not Approved

2011

$

120,000

2009

$

125,000

$

125,000

$

125,000

$

125,000

2011

$

130,000

2011

$

130,000

2011

$

130,000

2011

$

131,000

2011

$

131,000

2011

$

150,000

2011

$

150,000

2011

$

150,000

2011

$

150,000

2011

$

150,000

2011

$

150,000

2011

$

150,000

2009

$

150,000

2011

$

150,000

2009

$

150,000

2011

$

175,000

2011

$

175,000

2010

$

200,000

2010

$

200,000

2011 2011

O R

PP

Funding Request

2011

D VE

Route (Infrastructure Only)

755 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - 6th Grade Academy

Technology

Taylor School District

Taylor

Taylor - Johnson Elementary

Technology

Taylor School District

Taylor

Taylor - Kinyon Elementary

Technology

Taylor School District

Taylor

Taylor - McDowell Elementary

Technology

Taylor School District

Taylor

Taylor - Randall Elementary

Technology

Taylor School District

Taylor

Taylor - Taylor Parks Elementary

Technology

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Technology

Taylor School District

Taylor

Taylor - Fischer Elementary

Technology

Taylor School District

Taylor

Taylor - Holland Elementary

Technology

Taylor School District

Taylor

Taylor - Moody Elementary

Technology

Taylor School District

Taylor

Taylor - Myers Elementary

Technology

Taylor School District

Taylor

Taylor - Kennedy High School

Roof Replacement - Green

Taylor School District

Taylor

Taylor - Career Center

Technology

Taylor School District

Taylor

Taylor - Hoover Middle School

Technology

Taylor School District

Taylor

Taylor - Kennedy High School

Technology

Taylor School District

Taylor

Taylor - Titan Alternative Educational

Technology

Taylor School District

Taylor

Taylor - Truman High School

Taylor School District

Taylor

Taylor - West Middle School

Taylor School District

Taylor

Taylor - Truman High School

Taylor School District

Taylor

Taylor - Eureka Heights Elementary

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

it

m b u

Taylor - Board Office

A T

e u

eq

Technology Technology

Roof Replacement - Green

Kitchen - Replace Serving Counters, Wells, Oven, Stove & Dishwasher Swipe Card System

Taylor - Pine - Utility Department

Swipe Card System

Taylor - Racho Elementary

Swipe Card System

Taylor - Wareing Elementary

Swipe Card System

Taylor - Pine - Utility Department

Asbestos Removal

Taylor

Taylor - Board Office

Plumbing Upgrade

Taylor

Taylor - Board Office

Building Surveillance

02262009

S

st

s

O N

R d

e t t

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date

30 Days 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 30 Days 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

2011

$

536,000

2011

$

536,000

$

536,000

$

536,000

$

536,000

2011

$

536,000

2011

$

536,000

2011

$

536,000

2009

$

536,000

2011

$

536,000

2011

$

536,000

2011

$

644,315

2011

$

1,070,000

2011

$

1,070,000

2011

$

1,070,000

2011

$

1,070,000

2011

$

1,070,000

2011

$

1,070,000

2011

$

1,276,875

2011

$

20,000

2009

$

6,000

2011

$

8,000

2011

$

8,000

2009

$

8,000

2011

$

10,000

2011

$

10,000

2011

$

17,000

2011 2011

O R

PP

Funding Request

2011

D VE

Route (Infrastructure Only)

756 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Taylor School District

Taylor

Taylor - Pine - Utility Department

Building Surveillance

Taylor School District

Taylor

Taylor - Racho Elementary

Building Surveillance

Taylor School District

Taylor

Taylor - Wareing Elementary

Building Surveillance

Taylor School District

Taylor

Taylor - Racho Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Wareing Elementary

Asbestos Removal

Taylor School District

Taylor

Taylor - Pine - Utility Department

Computers

Taylor School District

Taylor

Taylor - Board Office

Doors

Taylor School District

Taylor

Taylor - Pine - Utility Department

Technology

Taylor School District

Taylor

Taylor - Board Office

Lighting Replacement

Taylor School District

Taylor

Taylor - Pine - Utility Department

Replace Air Handlers

Taylor School District

Taylor

Taylor - Racho Elementary

Replace Air Handlers

Taylor School District

Taylor

Taylor - Wareing Elementary

Replace Air Handlers

Taylor School District

Taylor

Taylor - Pine - Utility Department

Drop Ceilings

Taylor School District

Taylor

Taylor - Racho Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Wareing Elementary

Drop Ceilings

Taylor School District

Taylor

Taylor - Board Office

Electrical Upgrade

Taylor School District

Taylor

Taylor - Pine - Utility Department

Taylor School District

Taylor

Taylor - Racho Elementary

Taylor School District

Taylor

Taylor - Wareing Elementary

Taylor School District

Taylor

Taylor - Racho Elementary

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District

Taylor

Taylor School District Taylor School District

m b u

s

st

Parking Lot Replacement

Doors

Doors

Parking Lot Replacement

Taylor - Pine - Utility Department

Lighting Replacement

Taylor - Racho Elementary

Lighting Replacement

Taylor - Wareing Elementary

Lighting Replacement

Taylor - 2 Locations in Districts

Wind Turbine (Electric System - Wind Mill)

Taylor - Pine - Utility Department

Boiler Replacement

Taylor

Taylor - Monroe Elementary

Demo

Taylor

Taylor - Racho Elementary

Electrical Upgrade

02262009

S

O N

R d

e t t

it

A T

e u

eq

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Submitted Requests - Not Approved

Expected Completion Date 2009

$

17,000

2009

$

17,000

$

17,000

$

20,000

$

20,000

2009

$

20,000

2011

$

20,000

2011

$

30,000

2011

$

40,000

2011

$

40,000

2011

$

40,000

2011

$

40,000

2011

$

50,000

2011

$

50,000

2011

$

50,000

2011

$

60,000

2011

$

60,000

2011

$

75,000

2011

$

75,000

2010

$

85,000

2011

$

100,000

2011

$

100,000

2011

$

100,000

2011

$

100,000

2011

$

119,000

2011

$

120,000

2011

$

120,000

2011 2011

O R

PP

Funding Request

2010

D VE

Route (Infrastructure Only)

757 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval 120 days from approval

Taylor School District

Taylor

Taylor - Wareing Elementary

Electrical Upgrade

Taylor School District

Taylor

Taylor - Board Office

Parking Lot Replacement

Taylor School District

Taylor

Taylor - Racho Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Wareing Elementary

Plumbing Upgrade

Taylor School District

Taylor

Taylor - Pine - Utility Department

Unit Vents

Taylor School District

Taylor

Taylor - Federal Elementary

Demo

Taylor School District

Taylor

Taylor - Racho Elementary

Demo

Taylor School District

Taylor

Taylor - Treadwell Elementary

Demo

Taylor School District

Taylor

Taylor - Board Office

Foundation Repair

Taylor School District

Taylor

Taylor - Board Office

Technology

Taylor School District

Taylor

Taylor - Taylor Center High

Demo

Taylor School District

Taylor

Taylor - Racho Elementary

Technology

Taylor School District

Taylor

Taylor - Wareing Elementary

Technology

Taylor School District

Taylor

Taylor - Racho Elementary

Roof Replacement - Green

Benzie County Central Schools Trenton Public Schools - Arthurs Middle School

A/C for office, remove asbetos pipe insulation and replace, insulate condesate pipe returns, replace boliers, rebuilt steam traps, convert steam heat to hot water heat, replace unit ventilators, add CCD, upgrade restrooms, add bldg mgt system, replace valves, replace domestic water heater, upgrade exhaust system in kitchen, and new unit vents in new addition. 7/1/2009 Replace classroom and corridor flooring with green products that reduce life cycle costs of labor and chemical applications. 5/22/2009 Provide new Instructional Technology including computers, printers & related peripherals (includes replacement of computers > 10 years old resulting in reduction in energy consumption) . 4/1/2009

Benzie County Central Schools Thompsonville, MI Trenton Public Schools Trenton

tt i m

d e t

q e R

Trenton Public Schools - Taylor Elementary

Trenton Public Schools Trenton

Trenton Public Schools - Trenton High School Install Wide Area Network

Trenton Public Schools Trenton

Trenton Public Schools Trenton

02262009

O N

30 Days

$

120,000

2011

$

150,000

$

150,000

$

150,000

$

150,000

2011

$

175,000

2011

$

175,000

2011

$

175,000

2011

$

200,000

2011

$

300,000

2011

$

450,000

2011

$

536,000

2011

$

536,000

2010

$

611,580

12/31/2009

$

351,000

7/22/2009

$

100,800

7/1/2009

$

66,000

2011

O R 2011

D VE

6/1/2009

$

288,000

Trenton Public Schools - Hedke Elementary

7/1/2009

$

495,000

Trenton Public Schools - Anderson Elementary

Provide new Instructional Technology including computers, printers & related peripherals (includes replacement of computers > 10 years old, resulting in reduction in energy consumption). 4/1/2009

7/1/2009

$

495,000

7/1/2009

$

990,000

Instructional Technology equipment replacement including computers, printers and related peripherals, including computers > 10 years old, resulting in reduction of Trenton Public Schools - Trenton High School energy consumption.

Submitted Requests - Not Approved

4/22/2009

2011

2011

PP

Funding Request

Provide new Instructional Technology including computers, printers & related peripherals (includes replacement of computers > 10 years old resulting in reduction in energy consumption). 4/1/2009

ub

S

s

st

e u

Trenton Public Schools Trenton

Trenton Public Schools Trenton

A T

Expected Completion Date

4/1/2009

Route (Infrastructure Only)

758 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

remodeling, furnishing, equipping, refurnishing and reequipping existing School Distric buildings, including security, mechanical, climate control and energy conservation improvements; constructing, an elevator addition at Hedke Elementary School and constructing and equipping a secure office/entrance addition at Arthurs Middle School acquiring and installing classroom furnishings and equipments; acquiring and installing technology infrastructure and technology equipment in school district buildings; and improving and developing sites in the School District.

$

495,360

7/1/2009

$

6,000

6/1/2009

$

30,000

4/1/2009

7/1/2009

$

132,000

4/1/2009

7/1/2009

$

168,000

4/1/2009

7/1/2009

$

168,000

4/22/2009

6/1/2009

$

252,000

4/22/2009

6/1/2009

$

252,000

4/22/2009

6/1/2009

$

288,000

4/1/2009 6/1/2009

7/1/2009 8/1/2009

$ $

424,800 100,000

6/1/2009

8/1/2009

$

160,000

6/29/2009

2/1/2010

$

400,000

6/1/2009

9/1/2009

$

400,000

6/1/2009

8/1/2009

$

500,000

6/29/2009 6/1/2009

8/21/2009 9/1/2010

$ $

550,000 600,000

6/1/2009

6/1/2010

$

840,000

6/1/2009

9/1/2010

$

1,000,000

6/1/2009

8/1/2009

$

1,100,000

Trenton Public Schools Trenton

5/1/2009

Trenton Public Schools Trenton

Trenton Public Schools - Trenton High School Replace and install new lockers, interior doors, dry erase boards Supply building with new Furnishings & Equipment for technology equipmentTrenton Public Schools - Taylor Elementary administrative.

Trenton Public Schools Trenton

Trenton Public Schools - Taylor Elementary

Install Wide Area Network

4/22/2009

Trenton Public Schools Trenton

Trenton Public Schools - Arthurs Middle School

Supply building with new Furnishings & Equipment for technology equipmentadministrative and media center (including furniture and shelving)

Trenton Public Schools - Anderson Elementary

Supply building with new Furnishings & Equipment for technology equipmentadministrative; Media Center furniture & shelving, Kitchen Equipment and Cafeteria Tables Supply building with new Furnishings & Equipment for technology equipmentadministrative; Media Center furniture & shelving, Kitchen Equipment and Cafeteria Tables

Trenton Public Schools - Hedke Elementary Trenton Public Schools - Anderson Elementary

Trenton Public Schools Trenton Trenton Public Schools Trenton

Install Wide Area Network

s

st

Install Wide Area Network

Trenton Public Schools Trenton

Trenton Public Schools - Hedke Elementary Trenton Public Schools - Arthurs Middle School

Trenton Public Schools Trenton Troy Troy School District

Supply building with new Furnishings & Equipment for technology equipmentadministrative; Media Center furniture & shelving, Kitchen Equipment, Cafeteria Trenton Public Schools - Trenton High School Seating and theater equipment Troy School District Replace roof at Maintenance Facility with Green Roof.

Troy School District

Troy

Troy School District

Troy School District

Troy

Troy School District

Troy School District

Troy

Troy School District

Troy School District

Troy

Troy School District Troy School District

Troy Troy

e u

Install Wide Area Network

eq

it

m b u

Troy School District

S

Troy School District Troy School District

R d

e t t

Replace 1970 cooling tower at Barnard, Bemis, Wass and Wattles Elementary Schools. Primary reason for replacement- improve energy efficiency. Replace aging, inefficient uninterruptible power supply systems in 23 buildings with higher efficiency units Upgrade lighting and lighting controls at Athens High School, Boulan, and Larson Middle Schools, and all Locker Rooms to improve lighting efficiency. Replace frames/doors/hardware and windows systems throughout district to improve security and energy efficiency.

Replace 190 manufacturer end-of-life network switches with updated models that better support energy conservation (automated computer shutdown). Replace 1950's hot water heating loop at International Academy Eas

Troy School District

Troy

Troy School District

Troy School District

Troy

Troy School District

Install dedicated video conferencing capability in selected buildings (total of 21 systems) in Troy School District. Rationale includes reduced busing between buildings for shared classes, migration from live field trips to virtual trips (saving fuel costs), and creating new opportunities Replace boilers at Athens High Schools, and Costello, Hill, Martell, Troy Union and Wattles Elementary Schools to improve energy efficiency.

Troy School District

Troy

Troy School District

Enhance DDC controls to improve energy efficiency at Athens HS, Boulan Park and Larson Middle Schools and Leonard and Morse Elementary Schools.

02262009

4/1/2009

A T

O N

Submitted Requests - Not Approved

D VE

37,080,000

Trenton Public Schools

Trenton Public Schools Trenton

Funding Request

$

Trenton Public Schools Trenton

Trenton Public Schools Trenton

Expected Completion Date

PP

O R 7/1/2009

Route (Infrastructure Only)

759 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Troy School District Troy Troy School District Troy Troy School District Troy Troy School District Troy Troy School District Troy

Project Name Troy School District Troy School District Troy School District Troy School District Troy School District

Troy School District Troy School District

Troy School District Troy School District

Project Description Mandatory fiber optic re-route due to city road construction Increase available network storage on Troy School District system replace sanitary drain piping at Boulan, Larson and Smith Middle School Add 185 wireless interactive tablets to intelligent classroom system Phase 3 video camera surveillance system in secondary schools Install new wireless communication system for building safety, maintenance, and operations (upgrades to two-way radio system) Create bus loop at Costello Elementary to improve student safety

Troy School District

Install 120 additional interactive student response systems in existing intelligent classroom project, to provide one student response system for each classroom. These systems are a component of the district's existing formative and common assessment projects.

Troy School District

Troy School District

Troy Troy

Troy

Troy

Arenac Eastern School District Twining/Mason Arenac Eastern School District Arenac Eastern School District Arenac Eastern School District Arenac Eastern School District Arenac Eastern School District Arenac Eastern School District

Ubly Community Schools Utica Community Schools Utica Community Schools Manchester Community Schools

$ $

125,000 150,000

5/1/2009

$

216,000

8/21/2009

$

550,000

12/17/2009

$

600,000

3/1/2009

7/1/2009

$

5,523

3/1/2009

P P A

O R

D VE

Arenac Eastern (1 building K-12)

Replacing old double electric ovens (30 years old) with more efficient LP ovens.

3/1/2009

5/1/2009

$

6,634

Arenac Eastern (1 building K-12)

To remove the conventional old style thermostats and control valves. This includesupgrading to an integrated mamagement system. Tie in a buliding feedback system to the boiler for optimizing energy conservation.

5/1/2009

7/1/2009

$

55,700

7/1/2009

$

13,579,000

5/15/2009

$

3,360

5/1/2009

$

3,380

8/1/2009

$

13,500

8/30/2009

$

28,800

7/10/2009

$

65,000

8/30/2009

$

68,000

$

2,020,000

August '09

$

400,000

June '09

August '09

$

200,000

6/10/2009

9/1/2009

$

45,000

Arenac Eastern (1 building K-12)

Twining/Mason

Arenac Eastern (1 building K-12)

Twining/Mason

Arenac Eastern (1 building K-12)

Twining/Mason

Arenac Eastern (1 building K-12)

Twining/Mason

Arenac Eastern (1 building K-12)

tt i m

d e t

Arenac Eastern (1 building K-12)

b u S

Ubly Community Schools Utica Community Schools

Utica

Utica Community Schools

Village of Manchester

Manchester Schools- High School

02262009

10/15/2009 8/1/2009

Occupancy sensors for automative lighting for elementary classrooms and hallway.

Twining/Mason

Utica

6/1/2009 6/1/2009

Arenac Eastern (1 building K-12)

Arenac Eastern (1 building K-12)

Ubly

Funding Request 20,000 50,000 50,000 66,600 75,000

Troy School District

Twining/Mason

Arenac Eastern School District Twining/Mason

$ $ $ $ $

Replace wireless microphone systems in 700 MHz band threatened by unfunded FCC ruling as part of digital TV conversion, including elementary classroom voice amplification systems 3/22/2009 Install 100 additional interactive whiteboard/intelligent classroom/student response systems in district 5/1/2009

Troy School District

Troy School District Troy Arenac Eastern School District Twining/Mason Arenac Eastern School District Twining/Mason

Start Date 7/6/2009 7/6/2009 6/1/2009 4/1/2009 10/1/2009

Expected Completion Date 7/20/2009 10/15/2009 9/1/2010 10/29/2009 4/1/2010

T O

N s

st

Replace high wattage fixtures (34) with more efficient fluorescent F - Bay fixtures with t - 5 lamps and wire guards in the gymnasium and multi-purpose room. This will save 180 watts per fixture. 3/1/2009 Blinds need to be installed on classroom windows to block out the sun and also cold air. They currently do not have any.4/12/09 4/1/2009 Fully automated, sensored flush valves for urinals. This feature will decrease water usage and save cost. 4/1/2009

e u

q e R

New air condition units to replace window units with high efficiency roof top systems. 6/1/2009 Replace exterior entrance doors (36) with R-15 rated insulated thermo glass panels. Doors are R-15 rated also. 6/12/2009 Resurface the main parking lot. This is for a 2" overlay. The total square feet is 63,000. 6/15/2009 Construct a bus garage. Arenac Eastern currently does not have a buliding to perform maintenance. All busses (5) are kept outside. In the past we have experienced vandalism and non starts due to extreme cold weather. Snow/ice is an ongoing problem for early morning runs. 6/15/2009 partially remodeling, furnishing and refurnishing, equipping and re-equipping the Ubly Community School building; acquiring, installing and equipping educational technology for the school building; purchasing school buses; partially remodeling and equipping the bus garage; improving and equipping athletic play fields; and developing and improving the sites. Replace lighting throughout the building with T-8's and rewire, along with room sensors for turning on and off the lights. June '09 Driveway and Parking lot paving Replacement of sodium halide light fixtures with high intensity fluorescent to save energy in lighting of commons and gymnasium areas.

Submitted Requests - Not Approved

Route (Infrastructure Only)

760 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Manchester Community Schools Manchester Community Schools Manchester Community Schools

Project Name

Project Description

Start Date

Village of Manchester

Manchester Schools-Klager Elementary Schools

Village of Manchester

Manchester Community Schools

Improve student safety by relocation of school building office to a location from which building entry can be monitored. Renovate former office to preserve classroom space. Renovate two additional classrooms to a) create space for providing services to special needs children and b) provide additional kindergarten space needed for fulltime kindergarten program. 6/10/2009 Replacement of 10 busses of 20 bus fleet. Replacements included busses equipped for transportation of students with special needs. 6/10/2009

Manchester Community Schools

Provide additional power and data drops in classrooms for technology upgrades. Provide new computers, ceiling projectors, and related educational support equipment as needed across the district. 5/1/2009

Village of Manchester

Expected Completion Date

9/1/2009 Immediate

P P A

O R 9/1/2009

Funding Request

D VE $

800,000

$

850,000

$

1,200,000

$

2,500,000

$

20,000

Waldron Area Schools Waldron

Waldron School District

Renovations to community education and pre-school center building. Building houses community education pre-school, co-op pre-school, early-on and Parents as Teachers programs, as well as Community Resource Center. Building is in need of roof replacement, lighting upgrades, and boiler replacements. These improvements will not only insure continued viability of the structure for critical community use, but also improve energy efficiency. 6/10/2009 Replace the hot water heaters in the elementary and high school buildings to improve efficiency.

Waldron Area Schools Waldron

Waldron School District

Addition of trophy cases in the High School entryway to be built by local contractors

$

6,500

Waldron Area Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Macomb ISD

Waldron School District Warren Woods Public Schools - Warren Woods Middle School

Additions to the existing camera systems to increase school security

$

10,000

Warren Woods Public Schools - Bus Garage Warren Woods Public Schools - Education Center Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Warren Woods Middle School Rockwell School

Insulate Shop Area

Manchester Community Schools

Van Dyke Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Macomb ISD Warren Woods Public Schools

Village of Manchester

Waldron Warren Warren Warren Warren Warren Warren Warren

Manchester Schools-Ackerson Building Updates

Warren Warren Warren Warren Warren

02262009

s t s

Replace Auditorium HVAC System

-N

4/13/2009

5/29/2009

$

400,000

3/30/2009

4/10/2009

$

20,000

4/13/2009

5/8/2009

$

25,000

Greenhouse Replacement 4/13/2009 Replace Football Field and Baseball/Softball Field Scoreboards with Energy Efficient LED Boards 4/13/2009

4/24/2009

$

35,000

4/17/2009

$

75,000

Replace Auditorium lighting with high efficiency LED lights Replace boilers, HVAC system and controls with energy efficient type.

5/1/2009 1/9/2009

$ $

150,000 1,000,000

$

62,600,000

e u

Replace Building Sign with LED

eq

R d

e t tt

i m

Warren

T O

b u S

Van Dyke Public Schools Warren Woods Public Schools - Education Center Warren Woods Public Schools - Enterprise High School Warren Woods Public Schools - Tower High School Rockwell School

9/1/2009

4/13/2009

erecting, equipping and furnishing additions to school buildings and preparing, developing and improving sites for additions to school buildings; remodeling, reequipping, re-furnishing school buildings, athletic fields, playgrounds and other facilities and preparing, developing and improving sites at school buildings, athletic fields, playgrounds and other facilities; erecting, equipping and furnishing a career center building at the high school and preparing, developing and improving the site for the career center building; and equipping and re-equipping school buildings for technology systems and equipment and purchasing school buses. Replace All Lockers

7/20/2009

8/14/2009

$

70,000

Replace Building Classroom Flooring

6/17/2009

7/24/2009

$

75,000

6/17/2009

8/28/2009 9/9/2009

$ $

97,000 120,000

3/23/2009

8/28/2009

$

6,507,155

Install Acoustic Panels in Pool Renovate food service kitchen. District-Wide Roof Replacement - Replace 619,729 SF of Tremco built-up roof Warren Woods Public Schools - District-Wide systems.

Submitted Requests - Not Approved

Route (Infrastructure Only)

761 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Warren Woods Public Schools Romeo Community Schools

Oakland Schools

Location City or Township

Warren

Project Name Warren Woods Public Schools - Enterprise High School Warren Woods Public Schools - Briarwood Elementary Warren Woods Public Schools - Pinewood Elementary Warren Woods Public Schools - Education Center Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Enterprise High School Warren Woods Public Schools - Warren Woods Middle School Warren Woods Public Schools - Education Center Warren Woods Public Schools - Westwood Elementary Warren Woods Public Schools - Briarwood Elementary Warren Woods Public Schools - Education Center Warren Woods Public Schools - Pinewood Elementary Warren Woods Public Schools - Tower High School Warren Woods Public Schools - Education Center Warren Woods Public Schools - Education Center

Warren

Warren Woods Public Schools - District-Wide New Student Tables, Desks and Chairs

3/30/2009

4/30/2009

$

975,000

Warren

Metal Roof Replacement

3/30/2009

4/24/2009

$

120,000

Washington Township

Warren Woods Public Schools - Bus Garage Romeo Community School / Powell Middle School

Connect to municipal water system

6/1/2009

8/1/2009

$

1,000,000

Waterford

Oakland Schools-ISD Main Campus

Upgrades to a career and technical education facility replacing bldg infrastructure, lighting, plumbing, security, electrical, HVAC and upgrading science/math teaching lab3/1/2009

12/15/2009

$

2,000,000

Wayland Union Schools

erecting, furnishing and equipping additions to and partially remodeling, refurnishing and re-equipping school district buildings, acquiring and installing educational technology improvements; purchasing school buses; and developing and improving sites, athletic facilities, playgrounds and play fields.

$

38,930,000

Adams Middle School

Re roof portion of the building and re seam the rest

6/15/2009

9/6/2009

$

500,000

Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren Warren

u S

bm

Start Date

Funding Request

Replace Buiding Sign

3/16/2009

3/27/2009

$

12,000

Replace Building Sign

3/16/2009

3/27/2009

$

12,000

Replace Building Sign

3/16/2009

3/27/2009

$

12,000

Resurface Gym Floor

4/13/2009

4/17/2009

$

18,000

Install Gymnasium Curtain

4/13/2009

$

20,000

Install Acoustic Panels in Gym

4/13/2009

4/24/2009

$

25,000

Construct Dumpster Enclosure

4/13/2009

5/8/2009

$

30,000

4/13/2009

4/24/2009

$

50,000

Tuck Point Building / Power Wash All Brick Playground Upgrades - Remove existing play equipment and surfacing material and replace with ADA compliant. Playground Upgrades - Remove existing play equipment and surfacing material and replace with ADA compliant.

4/13/2009

5/1/2009

$

75,000

3/23/2009

6/17/2009

$

85,000

3/23/2009

6/17/2009

$

120,000

Replace All Existing Ceilings Playground Upgrades - Remove existing play equipment and surfacing material and replace with ADA compliant. Remove CCA wood equipment.

3/30/2009

5/8/2009

$

120,000

3/23/2009

6/17/2009

$

125,000

4/13/2009

4/24/2009

$

125,000

4/13/2009

4/24/2009

$

150,000

3/23/2009

6/17/2009

$

160,000

A T

Replace Auditorium Exterior Concrete

s

st

e u

Replace All Building Sidewalks

O N

Replace All Sidewalks Playground Upgrades - Remove existing play equipment and surfacing material and replace with ADA compliant.

eq

R d

e t t

it

Project Description

Expected Completion Date

PP

O R 4/24/2009

D VE

Wayland Union Schools

Wayland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Stottlemyer Early Childhood Ctr

Add DDC to Stand-Alone Classrooms

6/15/2009

9/6/2009

$

5,000

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Add timeclock/photocell controls to canopy lights

6/15/2009

9/6/2009

$

10,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

762 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Add DDC HVAC controls to stand-alone SXI classrooms

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Transportation Bldg

Add DDC temperature controls to garage heat/exhaust fans

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Hamilton Elementary

Re seam roof

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Marshall Middle School

Replace some exterior doors

6/15/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Add DDC HVAC controls to stand-alone SXI classrooms

Wayne-Westland Community School District

Westland

Stottlemyer Early Childhood Ctr

Re seam roof

Wayne-Westland Community School District

Westland

Stevenson Middle School

Rework duct work for rooms 325 & 327

Wayne-Westland Community School District

Westland

Jefferson Elementary

Add day/night start temperature controls to HVAC units in classrooms

Wayne-Westland Community School District

Westland

Kettering Elementary

Wayne-Westland Community School District

Westland

Lincoln Elementary

Wayne-Westland Community School District

Westland

Tinkham Alternative Center

Wayne-Westland Community School District

Westland

Transportation Bldg

Wayne-Westland Community School District

Westland

Taft Elementary

Wayne-Westland Community School District

Westland

John Glenn High School

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

12,000

$

20,000

$

20,000

9/6/2009

$

20,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

30,000

Add day/night start temperature controls to HVAC units in classrooms

6/15/2009

9/6/2009

$

30,000

Add day/night start temperature controls to HVAC units in classrooms

6/15/2009

9/6/2009

$

30,000

Add Motion sensors/switches to classroom bathrooms

6/15/2009

9/6/2009

$

40,000

Re-roof

6/15/2009

9/6/2009

$

61,000

Add DDC temperature controls to all stand-alone classrooms UVs

6/15/2009

9/6/2009

$

100,000

Replace café' condenser unit

6/15/2009

9/6/2009

$

100,000

Edison Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Elliott Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Westland

Hamilton Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Westland

Hicks Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

763 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Hoover Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Jefferson Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Lincoln Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Madison Elementary

Replace gym lights with T-8 fixtures

6/15/2009

Wayne-Westland Community School District

Westland

Patchin Elementary

Replace gym lights with T-8 fixtures

Wayne-Westland Community School District

Westland

PD Graham Elementary

Replace gym lights with T-8 fixtures

Wayne-Westland Community School District

Westland

Roosevelt Elementary

Replace gym lights with T-8 fixtures

Wayne-Westland Community School District

Westland

Schweitzer Elementary

Replace gym lights with T-8 fixtures

Wayne-Westland Community School District

Westland

Taft Elementary

Replace gym lights with T-8 fixtures

Wayne-Westland Community School District

Westland

Tinkham Alternative Center

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Wayne-Westland Community School District

Westland

Walker Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

5,000

$

5,000

$

5,000

9/6/2009

$

5,000

6/15/2009

9/6/2009

$

5,000

6/15/2009

9/6/2009

$

5,000

6/15/2009

9/6/2009

$

5,000

6/15/2009

9/6/2009

$

5,000

6/15/2009

9/6/2009

$

5,000

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Wildwood Elementary

Replace gym lights with T-8 fixtures

6/15/2009

9/6/2009

$

5,000

Transportation Bldg

Change parking lot & wall-pack lights to LED

6/15/2009

9/6/2009

$

15,000

Buildings and Grounds

Lighting Upgrades-Motion Sensors

6/15/2009

9/6/2009

$

15,000

John Glenn High School

Replace Detroit Edison Parking lot lights with LED

6/15/2009

9/6/2009

$

15,000

Westland

Marshall Middle School

Replace gym lights w/ T-8 fixtures

6/15/2009

9/6/2009

$

15,000

Westland

Wayne Memorial High School

Replace pool lights w/ T-8 fixtures

6/15/2009

9/6/2009

$

15,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

764 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Administration Building

Change parking lot & wall-pack lights to LED

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Career Tech Center

Change parking lot & wall-pack lights to LED

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Franklin Middle School

Change parking lot & wall-pack lights to LED

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Stevenson Middle School

Change parking lot & wall-pack lights to LED

6/15/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Change wall pack lights to LED

Wayne-Westland Community School District

Westland

Patchin Elementary

Improve parking lot lighting

Wayne-Westland Community School District

Westland

Jefferson Elementary

Replace and improve parking lot lighting

Wayne-Westland Community School District

Westland

Taft Elementary

Re seam roof

Wayne-Westland Community School District

Westland

Career Tech Center

Wayne-Westland Community School District

Westland

Hicks Elementary

Wayne-Westland Community School District

Westland

Hoover Elementary

Wayne-Westland Community School District

Westland

Lincoln Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

20,000

$

20,000

$

20,000

9/6/2009

$

20,000

6/15/2009

9/6/2009

$

20,000

6/15/2009

9/6/2009

$

20,000

6/15/2009

9/6/2009

$

20,000

6/15/2009

9/6/2009

$

25,000

Replace and add to the outside lighting LED

6/15/2009

9/6/2009

$

25,000

Replace and improve parking lot lighting

6/15/2009

9/6/2009

$

25,000

Replace and improve parking lot lighting

6/15/2009

9/6/2009

$

25,000

Replace and improve parking lot lighting

6/15/2009

9/6/2009

$

25,000

Wayne Memorial High School

Change parking lot & wall-pack lights to LED

6/15/2009

9/6/2009

$

30,000

Stevenson Middle School

Remove 21 elect heaters and insulate

6/15/2009

9/6/2009

$

30,000

John Glenn High School

Replace gym lights w/ T-8 fixtures

6/15/2009

9/6/2009

$

30,000

Stevenson Middle School

Replace interior doors

6/15/2009

9/6/2009

$

50,000

Westland

Career Tech Center

Replace shop/bay lights with T-8 fixtures

6/15/2009

9/6/2009

$

60,000

Westland

Wayne Memorial High School

Replace and improve parking lot lighting

6/15/2009

9/6/2009

$

100,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

765 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Re roof and replace down spouts

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Replace hallway lighting

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Career Tech Center

Re roof

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Re roofing portions of building

6/15/2009

Wayne-Westland Community School District

Westland

Marshall Middle School

Re-surface tennis courts

Wayne-Westland Community School District

Westland

Hicks Elementary

Replace fire door

Wayne-Westland Community School District

Westland

Kettering Elementary

Repave play areas

Wayne-Westland Community School District

Westland

John Glenn High School

Replace chalk board with white board

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Replace chalk board with white board

Wayne-Westland Community School District

Westland

Adams Middle School

Wayne-Westland Community School District

Westland

Madison Elementary

Wayne-Westland Community School District

Westland

Career Tech Center

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

155,000

D VE $

250,000

$

700,000

9/6/2009

$

1,000,000

6/15/2009

9/6/2009

$

30,000

6/15/2009

9/6/2009

$

40,000

6/15/2009

9/6/2009

$

50,000

6/15/2009

9/6/2009

$

200,000

6/15/2009

9/6/2009

$

200,000

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

300,000

Seal coat asphalt parking lots

6/15/2009

9/6/2009

$

10,000

Seal coat asphalt parking lots

6/15/2009

9/6/2009

$

15,000

Stevenson Middle School

Seal coat asphalt parking lots

6/15/2009

9/6/2009

$

15,000

Tinkham Alternative Center

Remove old asphalt behind the building

6/15/2009

9/6/2009

$

25,000

Adams Middle School

Sidewalk improvements

6/15/2009

9/6/2009

$

25,000

Edison Elementary

Sidewalk improvements

6/15/2009

9/6/2009

$

25,000

Westland

Elliott Elementary

Sidewalk improvements

6/15/2009

9/6/2009

$

25,000

Westland

Franklin Middle School

Sidewalk improvements

6/15/2009

9/6/2009

$

25,000

02262009

d e tt

t i m

S

ub

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

766 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Hamilton Elementary

Sidewalk improvements

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Jefferson Elementary

Sidewalk improvements

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Marshall Middle School

Sidewalk improvements

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Patchin Elementary

Sidewalk improvements

6/15/2009

Wayne-Westland Community School District

Westland

PD Graham Elementary

Sidewalk improvements

Wayne-Westland Community School District

Westland

Roosevelt Elementary

Sidewalk improvements

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Sidewalk improvements

Wayne-Westland Community School District

Westland

Walker Elementary

Sidewalk improvements

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Painting and Finishing

Wayne-Westland Community School District

Westland

Wildwood Elementary

Sidewalk improvements

Wayne-Westland Community School District

Westland

Administration Building

Wayne-Westland Community School District

Westland

Jefferson Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

25,000

$

25,000

$

25,000

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

25,000

6/15/2009

9/6/2009

$

30,000

6/15/2009

9/6/2009

$

30,000

Painting and Finishing

6/15/2009

9/6/2009

$

35,000

Painting and Finishing

6/15/2009

9/6/2009

$

35,000

Buildings and Grounds

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

35,000

Administration Building

Painting and Finishing

6/15/2009

9/6/2009

$

45,000

Lincoln Elementary

Painting and Finishing

6/15/2009

9/6/2009

$

45,000

Hamilton Elementary

Painting and Finishing

6/15/2009

9/6/2009

$

50,000

Westland

Patchin Elementary

Painting and Finishing

6/15/2009

9/6/2009

$

50,000

Westland

Career Tech Center

Sidewalk improvements

6/15/2009

9/6/2009

$

50,000

02262009

d e tt

t i m

S

ub

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

767 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Sidewalk improvements

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Wildwood Elementary

Top coat all asphalt play areas

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Edison Elementary

Painting and Finishing

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Elliott Elementary

Painting and Finishing

6/15/2009

Wayne-Westland Community School District

Westland

Hicks Elementary

Painting and Finishing

Wayne-Westland Community School District

Westland

Madison Elementary

Painting and Finishing

Wayne-Westland Community School District

Westland

Buildings and Grounds

Painting and Finishing

Wayne-Westland Community School District

Westland

PD Graham Elementary

Painting and Finishing

Wayne-Westland Community School District

Westland

Schweitzer Elementary

Painting and Finishing

Wayne-Westland Community School District

Westland

Stottlemyer Early Childhood Ctr

Painting and Finishing

Wayne-Westland Community School District

Westland

Taft Elementary

Wayne-Westland Community School District

Westland

Tinkham Alternative Center

Wayne-Westland Community School District

Westland

Walker Elementary

Wayne-Westland Community School District

Westland

Wildwood Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

50,000

$

50,000

$

55,000

9/6/2009

$

55,000

6/15/2009

9/6/2009

$

55,000

6/15/2009

9/6/2009

$

60,000

6/15/2009

9/6/2009

$

65,000

6/15/2009

9/6/2009

$

65,000

6/15/2009

9/6/2009

$

65,000

6/15/2009

9/6/2009

$

65,000

Painting and Finishing

6/15/2009

9/6/2009

$

65,000

Painting and Finishing

6/15/2009

9/6/2009

$

65,000

Painting and Finishing

6/15/2009

9/6/2009

$

65,000

Painting and Finishing

6/15/2009

9/6/2009

$

65,000

Kettering Elementary

Painting and Finishing

6/15/2009

9/6/2009

$

70,000

Career Tech Center

Painting and Finishing

6/15/2009

9/6/2009

$

95,000

Westland

Hoover Elementary

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

100,000

Westland

Jefferson Elementary

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

120,000

02262009

d e tt

t i m

S

ub

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

768 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Adams Middle School

Painting and Finishing

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

John Glenn High School

Painting and Finishing

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Marshall Middle School

Painting and Finishing

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Stevenson Middle School

Painting and Finishing

6/15/2009

Wayne-Westland Community School District

Westland

Edison Elementary

Replace Resilient Flooring carpet and tile

Wayne-Westland Community School District

Westland

Elliott Elementary

Replace Resilient Flooring carpet and tile

Wayne-Westland Community School District

Westland

Hicks Elementary

Replace Resilient Flooring carpet and tile

Wayne-Westland Community School District

Westland

Lincoln Elementary

Replace Resilient Flooring carpet and tile

Wayne-Westland Community School District

Westland

Madison Elementary

Wayne-Westland Community School District

Westland

Patchin Elementary

Wayne-Westland Community School District

Westland

PD Graham Elementary

Wayne-Westland Community School District

Westland

Schweitzer Elementary

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District

Westland

Wayne-Westland Community School District Wayne-Westland Community School District

Funding Request

$

D VE

150,000

$

150,000

$

150,000

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

6/15/2009

9/6/2009

$

150,000

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Stottlemyer Early Childhood Ctr

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Taft Elementary

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Tinkham Alternative Center

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Wildwood Elementary

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

150,000

Westland

Kettering Elementary

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

$

180,000

Westland

Taft Elementary

Update all playground equipment and fall zones

6/15/2009

9/6/2009

$

200,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

769 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne-Westland Community School District

Westland

Marshall Middle School

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Painting and Finishing

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Franklin Middle School

Replace Resilient Flooring carpet and tile

6/15/2009

9/6/2009

Wayne-Westland Community School District

Westland

Stevenson Middle School

Replace Resilient Flooring carpet and tile

6/15/2009

Wayne-Westland Community School District

Westland

Wayne Memorial High School

Replace Resilient Flooring carpet and tile

Wayne-Westland Community School District

Westland

Vandenberg Elementary

Replace Resilient Flooring carpet and tile

Westland

Buildings and Grounds

Replace custodial and maintenance equipment

Whitmore Lake

Whitmore Lake

Whitmore Lake Middle Install double doors at 7 exterior locations to provide air lock for energy savings 5/1/2009 Whitmore Lake High- a LEED Silver Certified school building Remove and replace Main glycol pump and motor 2/2/2009 Remove And Replace maintenance shop high bay lighting with compact fluorescent in Whitmore Lake Middle order to achieve energy savings 2/1/2009 Remove And Replace bus maintenance shop high bay lighting with compact Whitmore Lake Middle fluorescent in order to achieve energy savings 2/1/2009 Install dual technology occupancy sensors in all classrooms in order to achieve energy savings 2/10/2009 Whitmore Lake Elementary

Whitmore Lake

Whitmore Lake Middle

Whitmore Lake

Whitmore Lake Middle

Wayne-Westland Community School District Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools

Whitmore lake Whitmore Lake Whitmore Lake

s t s

T O

250,000

D VE

285,000

$

300,000

9/6/2009

$

300,000

6/15/2009

9/6/2009

$

325,000

6/15/2009

9/6/2009

$

650,000

6/15/2009

9/6/2009

$

1,000,000

7/30/2009

$

88,878

2/27/2009

$

11,650

3/15/2009

$

12,800

3/15/2009

$

16,800

3/20/2009

$

24,878

3/16/2009

$

28,645

e u

q e R

$

$

O R

P P A

-N

Funding Request

Remove and replace Sanitary lift station motors, grinder pumps and electric controls 3/2/2009

Remove and replace Storm water lift station motors, pumps and electric controls Remove And Replace gym high bay lighting with compact fluorescent in order to Whitmore Lake Middle achieve energy savings Whitmore Lake High- a LEED Silver Certified Remove And Replace gym high bay lighting with compact fluorescent in order to school building achieve energy savings classroom light fixture replacement from T12 to T 8 in order to achieve 25% energy Whitmore Lake Elementary saving Remove & Replace 6 Pairs of Exterior Doors in order to regain proper function and Whitmore Lake Elementary achieve energy savings Whitmore Lake High- a LEED Silver Certified Install generator at fire suppression pump house in order to have proper power in the school building event of an electrical outage

3/2/2009

3/16/2009

$

35,295

2/1/2009

3/15/2009

$

48,672

2/2/2009

3/31/2009

$

48,682

2/1/2009

3/10/2009

$

68,560

3/15/2009

4/29/2009

$

87,928

3/2/2009

5/29/2009

$

119,868

5/1/2009

5/15/2009

$

119,680

Whitmore Lake

Whitmore Lake Elementary Mill down and replace Asphalt in South and east parking lots Whitmore Lake High- a LEED Silver Certified Install storm sewer line on south side of ring road from road right of way to catch school building basin feeding the fire retention pond

5/1/2009

8/28/2009

$

128,076

Whitmore Lake

Whitmore Lake Middle

Mill down and replace Asphalt in South, North and east parking lots

5/1/2009

5/15/2009

$

196,345

Whitmore Lake

Whitmore Lake Middle

Remove and replace storm water drain pipes and catch basins

5/15/2009

8/20/2009

$

286,868

Whitmore Lake

Whitmore Lake Elementary

Build mezzanine in high bay receiving room for additional storage

2/1/2009

3/20/2009

$

16,848

Whitmore Lake Whitmore Lake Whitmore lake

ub

Whitmore Lake Whitmore Lake

S

Whitmore Lake

02262009

tt i m

d e t

Submitted Requests - Not Approved

Route (Infrastructure Only)

770 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools Whitmore Lake Public Schools

Project Name

Project Description

Whitmore Lake

Whitmore Lake Middle

Whitmore Lake

Whitmore Lake Middle

Whitmore Lake

Whitmore Lake HS, ES, MS Whitmore Lake High School and Middle School

Whitmore Lake Whitmore Lake

Start Date

Remove and replace east gym RTU, install proper structural steel to support new unit, and tie in communication to the building DDC system in order to achieve energy savings. 5/1/2009 Tearoff and re roof entire Middle School Roof using white reflective PVC 60 mil Sarnafil roofing 5/1/2009

8/24/2009

Senteo™ interactive response system for our instructional classrooms

2/30/2009

3/20/2009

Implement interactive Whiteboards in each of our instructional classrooms.

2/30/2009

3/15/2009

Whitmore Lake

7/30/2009

Funding Request

$

D VE

1,218,638

$

30,000

$

78,000

$

90,000

3/20/2009

$

140,000

6/30/2009

$

88,786

5/31/2009

$

93,000

5/1/2009

12/15/2009

$

5,000,000

Replace Roof with Added Insulation and Energy Star Single Ply Membrane

6/18/2009

August '09

$

22,500

Install High Efficiency Boiler Improve Indoor Air Quality by Replacing Rooftop Heating and Ventilating Unit with High Efficiency Unit

6/18/2009

August '10

$

42,000

6/18/2009

August '09

$

48,000

Improve Storm Water Management through Pervious Paved Parking Lot

6/18/2009

August '09

$

60,000

T O

P P A

O R

Elk Rapids Schools

Williamsburg

Elk Rapids Schools - Mill Creek Elementary

The project includes installation of DDC temperature controls and variable frequency drives (VFD's) on HVAC systems at Mill Creek Elementary. This would enable the district to optimize and tie-in this 20 year-old building's heating and ventilation system to the district's new energy management system. The district has 4 main buildings that include a high school, middle school and two elementaries. An energy management system with related DDC controls and other retrofit measures is currently being installed in all buildings except Mill Creek Elementary. A $275,000 contract, provided by bond funds could only cover 3 of our 4 buildings. That contract was awarded 12/8/08 and completion is expected by 4/1/09. Approval of this project would keep Mill Creek from being left out of the energy efficiency improvements already being installed at the District's 3 other buildings. The pricing for this request comes straight from official sealed bids received on 12/1/08. 4/1/2009

Oakland Schools Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District

Wixom

Oakland Schools-Tech Campus SW

Upgrades to a career and technical education facility replacing bldg infrastructure, lighting, plumbing, security, electrical, HVAC and upgrading labs

Wyandotte Wyandotte

Wyandotte Public Schools Madison Wyandotte Public Schools Administration Building

Wyandotte

Wyandotte Public Schools Taft

Wyandotte

Wyandotte Public Schools Madison

3/29/2009

Route (Infrastructure Only)

226,000

$

Whitmore Lake Middle School and Elementary Upgrade 3 Computer labs with Dell Opti 360, Desktop Base units with 17in monitors. 2/30/2009 Implement interactive Whiteboards in each of our instructional classrooms with Whitmore Lake Elementary projectors. 2/30/2009 Remove and Replace Office and entry area RTU, Program and install communication Whitmore Lake Elementary to building DDC system in order to achieve energy savings 5/15/2009

Whitmore Lake

Expected Completion Date

N s

m b u

Wyandotte

u q e

R d

e t t

it

t s e

Wyandotte Public Schools Jo Wyandotte Public Schools Administration Building

Improve Storm Water Management through Pervious Paved Parking Lot

6/18/2009

August '09

$

60,000

Install High Efficiency LED Parking Lot Lighting

6/18/2009

August '09

$

72,000

Wyandotte Public Schools Bus Garage

Replace Roof with Added Insulation and Energy Star Single Ply Membrane

6/18/2009

August '09

$

72,000

Wyandotte Public Schools Roosevelt

Install High Efficiency LED Parking Lot Lighting

6/18/2009

August '09

$

86,000

Wyandotte

Wyandotte Public Schools Washington

Replace Roof with Added Insulation and Energy Star Single Ply Membrane

6/18/2009

August '09

$

172,200

Wyandotte

Wyandotte Public Schools Jo Brighton

Replace Boiler with 2 High Efficiency Boilers

6/18/2009

August '10

$

450,000

Wyandotte Public Schools Washington

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

$

576,000

Wyandotte Wyandotte Wyandotte

Wyandotte City School District Wyandotte

02262009

S

Submitted Requests - Not Approved

771 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Description

Wyandotte Public Schools McKinley

6/18/2009

August '09

Wyandotte Public Schools Jo Brighton

Replace Roof with Added Insulation and Energy Star Single Ply Membrane

6/18/2009

August '09

Wyandotte

Wyandotte Public Schools Garfield

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

6/18/2009

August '09

Wyandotte

Wyandotte Public Schools Wilson

Replace Roof with Added Insulation and Energy Star Single Ply Membrane

6/18/2009

Wyandotte

Wyandotte Public Schools Roosevelt

6/18/2009

Wyandotte

Wyandotte Public Schools Washington

Replace Roof with Added Insulation and Energy Star Single Ply Membrane Masonry Repairs to Eliminate Water Infiltration include: Tuckpointing, and Coping Repair/Replacement

Wyandotte

Wyandotte Public Schools Roosevelt

Replace Freight Elevator

Wyandotte

Wyandotte Public Schools Roosevelt

Wyandotte

Wyandotte Public Schools Roosevelt

Replace Two Electrical Transformers Masonry Repairs to Eliminate Water Infiltration include: Tuckpointing, and Coping Repair/Replacement

Godwin Heights Public Schools

partially remodeling, furnishing and refurnishing, equipping and re-equipping school facilities; acquiring, installing and equipping technology for instructional purposes in school facilities; purchasing school buses, constructing, equipping, developing and improving athletic/physical education fields, facilities and playgrounds; and developing and improving sites.

Godwin Heights Public Schools Wyoming

st

Taylor

tt i m

d e t

b u S Troy Township Tuscarora Township

Troy Township Tuscarora Township, Cheboygan County

02262009

Troy Township Hall/Community Center STEP/STAG wastewater collection and treatment system

s

O N

Funding Request

$

D VE

780,000

$

785,000

$

955,000

August '09

$

1,692,000

August '09

$

60,000

6/18/2009

August '09

$

120,000

6/18/2009

August '09

$

240,000

6/18/2009

August '09

$

360,000

$

6,560,000

PP

O R

6/18/2009

August '09

Trillium Academy is a blossoming charter school in Taylor, Michigan. We have an enrollment of over 700 kindergarten through 12 grade students. Our curriculum has a strong emphasis on the performing arts. We built our new facility in 2005, and it includes a beautiful theater. We did not have funding for “extras” when our school was built, but we did have several companies quote what these would cost. We have many performances in our theater, from our youth symphony, band, plays and our award winning show choirs. Our request is for lighting, curtains, and a sound system. We are so proud of our students and would like to be able to showcase their talents. 4/1/2009

5/15/2009

$

135,000

To construct a new township hall that will also serve as a community center and emergency shelter for our rural community. The building would offer public computers, a fax machine, and other telecommunications technology to all residents. The project would also construct a tower to allow high speed internet access from the southern part of the county. At this time, internet access of any type is not available anywhere in the township. Township residents do not have access to these services through a school (the schools are in another county), library (no libraries serve this township), or their own homes. The current township, a one room schoolhouse built in the 1800s, is extremely outdated. The building does not have indoor plumbing (uses outhouses), telephones, or central heat. The use of a woodstove to heat the building prevents any residents with health problems from using the building. This creates additional problems at election times with accessibility problems. The lack of a constant heat source also prevents the township from being able to store any electronic equipment used for township business. The new township hall would incorp4/9/2009

10/10/2009

$

500,000

q e R

$

Submitted Requests - Not Approved

Route (Infrastructure Only)

758,000

$

A T

e u

Trillium Academy

Start Date

Improved Daylight Factor and Thermal Performance with New Windows and Doors with Aluminum Thermally Broken Frames, 1" Tinted Insulating Glass, and Operable Panes.

Wyandotte City School District Wyandotte Wyandotte City School District Wyandotte Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District Wyandotte City School District

Project Name

Expected Completion Date

4,200,000 NA

772 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tuscola Area Airport Authority Unadilla Township Unadilla Township Unadilla Township Unadilla Township Unadilla Township

Indianfields Township Unadilla Unadilla Unadilla Unadilla Unadilla

Project Name

Project Description

Crosswind Runway Downtown Improvements Downtown Improvements Downtown Improvements Downtown Improvements Downtown Improvements

Leh-Nah-Weh Native American Learning Center and the Sutton School Education Center

Sutton School, a one-room school house built in 1859 in Raisin Township Michigan by Quaker abolitionist, Asa Sutton, would be preserved and used for educational programs by Leh-Nah-Weh Native American Organization and the Underground Railroad Education Program, as well as other local groups. The classes and programs will focus on Native American life and culture, the history of the underground railroad and the abolitionist movement in Michigan. The School would be preserved by moving the school one mile to another site near the original Sutton farm within the same township. The Native American Learning Center, open to students and public, would be the only one in southern Michigan. The movers are local Michigan businesses. An addition would be built by local builders, including Native American building contractors in Lenawee County. The preservation of the building would serve as a classroom where students from the building trades classes of the local vocationa center could learn lifelong skills on historic preservation. A museum would be developed within the schoolhouse in cooperation with University of Michigan Museum by March 2009

Enterprize Park Sewer Relining

Relining of sanitary sewer lines that are currently causing inflow problems.

Upgrade of pump station that is currently over capacity.

it

02262009

PP

6/1/2010

7/1/2009

$

1,000,000

Sept., 2009

Dec., 2009

$

305,000

June, 2009

Jan., 2010

$

810,000

u q e

Waste Water Treatment Plant Upgrade Upgrade of WWTP from 1.2 mgd to 2.4 mgd West side/south side 12" Watermain Looping Lincoln Road Watermain looping connecting west side water with east side water systems.

Nov., 2009

Nov., 2010

$

3,745,665

Nov., 2009

June, 2010

$

1,608,350

Site Security

Installation of security at sewer locations including WWTP

March, 2009

June, 2009

$

20,000

Site Security River Road/Bamber Road 12" Watermain Looping

Installation of security at all water locations

March, 2009

June, 2009

$

170,000

Watermain looping connecting west side water with east side water systems

April, 2009

Aug., 2009

$

210,000

Mission Road Forcemain Relocation Isabella Road Well/Iron removal Filter Instalation/500,000 gallon tower

Relocation of forcemain that has broken on three prior occasions.

April, 2009

Aug., 2009

$

225,000

Installation of new well, iron removal filter instalation/500,000 gallon tower.

Nov. 2008

Nov., 2009

$

2,487,800

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 7,100,000 900,000 300,000 200,000 120,000 500,000

O N

R d

e t t

Pumpstation #6 Upgrade

O R

Funding Request

$ $ $ $ $ $

A T

t s e

m b u

S

Start Date

The project of the Tuscola Area Airport Authority is a crosswind runway. This capital improvement to the airport will make more of a contribution to the business community and the local citizens. The project especially helps the airport and future economic development by increasing air traffic and improving safety. The Airport Authority develops future plansthat will transform present airport facilities ito assets to the flying public that are customer-driven and need based. The Airport Authority insurance company give the airport the information that risk management requirements state that a 5000 foot runway is essential for jets to land at an airport more safely. The crosswind runway could be built in phases, which is contingent upon funding being available. The runway designed to be 5,000 feet long will allow more safety for business aircraft using the airport. This is vital in giving the Tuscola Area Airport the infrastructure to increase air traffic by having year-round all season access to the airport. 6/1/2009 Roads/Curbs 9/9/2009 Bury Overhead 8/9/2009 Pocket Park 7/9/2009 Sidewalks 5/9/2009 Street Lights 7/9/2009

s

Underground Railroad Education Program and Sutton School Preservation Foundation Raisin Township Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County Union Township, Isabella Union Township County

Expected Completion Date

M36/M106 M36/M106 M36/M106 M36/M106 M36/M106

773 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Fire/Safety Modernization

4/20/2009

5/20/2009

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing

Phone System and File Servers

4/20/2009

6/20/2009

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Replace two boilers in HS/MS

4/20/2009

5/15/2009

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Replace roofs on HS and MS

4/20/2009

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Replace and Modernize Heating and A/C Units

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing

Well Modernization

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Energy Audit and Retrofit

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Replace Vertical Hot Water Storage Tank 4 1/2' x 10'

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Replace Plumbing

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing

Water Quality Issues

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Unionville-Sebewaing Area Schools Sebewaing

Unionville-Sebewaing HS/MS

Unionville-Sebewaing Area Schools Sebewaing Unionville-Sebewaing Area Schools Sebewaing

$

15,000

D VE $

70,000

$

200,000

5/20/2009

$

250,000

4/20/2009

9/20/2009

$

1,500,000

5/20/2009

7/20/2009

$

10,000

5/20/2009

9/30/2009

$

50,000

7/20/2009

8/30/2009

$

40,000

7/20/2009

7/1/2010

$

55,000

7/20/2009

9/20/2009

$

76,000

Replace Exterior Doors, Windows and Reseal Brickwork

7/20/2009

8/30/2009

$

200,000

Educational Technology Infrastructure

7/20/2009

12/30/2010

$

300,000

Unionville-Sebewaing HS/MS

Landscaping HS/MS Grounds

4/20/2009

6/20/2009

$

5,000

Unionville-Sebewaing HS/MS

Classroom Carpet

7/20/2009

8/30/2009

$

30,000

Storage Building 40 x 60

7/20/2009

9/30/2009

$

150,000

d e tt

t i m

ub

Unionville-Sebewaing Area Schools Sebewaing

Funding Request

Unionville-Sebewaing HS/MS

T O

st

e u

q e R

N s

P P A

O R

Route (Infrastructure Only)

S 02262009

Submitted Requests - Not Approved

774 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Univerity of MichiganFlint Flint

Project Name

Project Description

Health Care Program Development to Meet Rising Health Care Needs

Expected Completion Date

Start Date

This proposal outlines four new health care programs in areas with excellent employment opportunities. To address the critical shortage of nursing faculty, a 12month intensive MS in Nursing Education program admitting 60 students per year will be developed. An online 12-month Nurse Practitioner Certificate Program is being developed to enhance the number of primary care providers in the US. Health Care has become increasingly dependent on technology – the proposed online certificate program in Health Information Management for 25 students per year will address the growing demand for expertise in managing electronic medical records and related documents. Addition of a Certificate in Medical Dosimetry (the only one in the state) for radiation therapists will expand job opportunities for them. All of these programs 6-9 months after will be financially sustainable by year 3 of implementation. bid award date

O R

D VE

P P A

University of MichiganFlint Flint

We propose creating a consortium with interested Michigan community colleges to provide state-of-the-art science and information technology education for community college teachers. The consortium will address critical shortage of community college teachers in science education and information technology. Due to shortage of qualified candidates many Michigan community colleges hire instructors with a bachelor degree to teach certain science and information technology courses. The consortium will offer a MS in Higher Education with emphasis on college teaching. The program will be intensive, offered via the internet and face-to-face sessions. It will accept cohorts of 40 students each year. The consortium will also sponsor 90 days after speaker series and certificate programs. award

University of MichiganFlint Flint

Prevention First is designed to reduce health disparities and improve health outcomes of medically underserved populations. The project utilizes community-based prevention strategies in implementation of health behavior change interventions focused on cardiovascular disease, diabetes and HIV prevention. Prevention First implements two developed programs from previous UM-Flint Urban Health and Wellness Center research. Program 1 is aimed at reducing risks of diabetes and cardiovascular diseases associated with poor nutrition, poor weight management, and lack of exercise. Program 2 focuses on HIV testing and risk reduction utilizing social networks and technology-based communication strategies. Prevention programs reduce health care costs creating a healthier workforce. Community persons will be employed as lay health educators increasing their skills for employability in the health 90 days after 24 months from care field. program approval bid award date

T O

Funding Request

Route (Infrastructure Only)

N s

$

2,680,000

$

1,513,600

$

1,200,000 N/A

$

3,684,247

t s e

u q e

R d

e t tt

Prevention First Project

i m

This project expands three existing programs. Expanding the sixteen-month second degree Bachelor of Science and Nursing (BSN) from 50 to 80 students benefits this underserved area and displaced manufacturing workers. The program builds upon earlier education and experience and, in a short time, prepares graduates for RN licensure. The second program involves the high demand area of Nursing Practice. Expanding the Doctor of Nursing Practice (DNP) Program from 60 to 90 will keep nurses in practice who presently hold the MSN Degree but who need to function as Nurse Practitioners in the future. The DNP educates people to be front-line health care givers. The third program is the Doctor of Physical Therapy (DPT). Expanding DPT admissions from 40 students per year to 80 will address significant physical Health Care Careers for Displaced Workers in therapy shortages (vacancy rates of 13.1 - 18.6%). The UM-Flint DPT Program 6-9 months from currently denies admission to over 100 qualified applicants a year. bid award a Medically Underserved Community

b u S University of MichiganFlint Flint

02262009

Submitted Requests - Not Approved

24 months from bid

775 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Upland Hills Ecological Awareness Center Oxford, MI

Project Name

Project Description

Start Date

Expected Completion Date

Sustainable Training Center

The vision of Upland Hills Center is to be a green incubator for training sustainability technitians in the areas of Agroecology, Renewable Energy, Conservation, and Green Building through sustainable micro-farm development, beginning with a schoolcentered CSA demonstration model. Organizational partners include Upland Hills Ecological Awareness Center, Upland Hills Farm, and Upland Hills School, bringing decades of experience directly relevant to this project, which we plan to replicate at schools and parks across Oakland County and throughout Michigan. Ground has already been turned for cultivation, but grant monies could significantly accelerate our infrastructure development and magnify our impact in the short term. Parties within Oakland County Government, Oakland County Parks, and Michigan State University are supportive of this mission, and longtime successful commercial grower East River Organic Farm is a strong collaborator, providing significant hands-on involvement and strategic consulting.The initial phase of the project will be achievable within 180 days with grant funding. Longer-term plans allow for successive expansion of the area unde3/1/2009

The Greening of the Museum

The Upper Peninsula Children’s Museum (UPCM), a 501(c)3 nonprofit, is located in the Upper Peninsula of Michigan (UP), in the downtown district of Marquette, along a newly developing iron ore heritage trail. The UPCM is a vibrant component in the downtown district and a magnet for economic growth, action breeds action, continuing today. Our 150 year old building’s first floor is mixed-use rental, a combination of office and retail; critical earned income. The UPCM is a whimsical non-traditional educational institution teaching children about the world through play and hands-on learning within interactive exhibits and related programming. The UPCM serves the entire rural region and is the only institution of its kind in the UP. The UPCM sees over 40,000 visitors a year and serves families of need through scholarship programs supported by donors so we don’t turn families away. The UPCM delights every child and is a treasure to the community. We are THE preferred destination of thousands, this proposal helps us to continue to exist in this tumultuous time through a series of energy efficiency changes and historically correct façade changes. Our dream is to m 5/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

2/1/2011

$

25,000,000

12/9/2009

$

468,000

$

850,000

N s

Upper Peninsula Children's Museum

Marquette, Michigan

qu

e R

The Upper Peninsula Health Education Corporation (UPHEC) will develop and sponsor enhanced trainings of primary care providers in the rural Upper Peninsula of Michigan (UP). Specifically, the Family Medicine Residency Program and the MSU College of Human Medicine will offer specialty medicine training tracks in the areas of a Geriatric Fellowship, a Hospitalist track, Rural Emergency Medicine track, and rural primary care placement of medical students for future recruitment and retention of rural physicians. UPHEC will create a one-year, post-graduate fellowship in the subspecialty of Geriatrics. This infrastructure and additional medical training will meet the needs of the growing geriatric population and meet societal. These fellows will Redesigning Rural Training of Primary Care provide care and leadership for the rural aging population. The redesign of Providers: Enhanced skill development in UPHEC’s Family Medicine Residency Program and introduction of rural placement of Geriatrics, Hospitalist Care, Emergency medical students will address the healthcare shortages of rural physicians. Currently, Medicine, and the Recruitment and Retention many rural communities lack 24-hour medical care for patients. Remote rural of Rural Physicians hospitals are experiencing healthcare shortages in recruiting and retaining hospitalists 1/1/2009

d e tt

Upper Peninsula Health Education Corporation

t s e

t i m

ub

Marquette, Michigan

S 02262009

Submitted Requests - Not Approved

776 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Healthy pregnancies and deliveries through the innovative group approach of “CenteringPregnancy” will be promoted by the Upper Peninsula Health Education Corporation (UPHEC) in partnership with FamilyCare Doctors and the Marquette Family Medicine Residency Program in the rural Upper Peninsula community of Marquette, Michigan. Quality medical care in a supportive group environment for expectant parents, many lower-income, Medicaid-eligible participants, from a variety of healthcare practitioners (nurses, physicians, nutritionists) will be afforded in supportive peer-parent group meetings (8-12 women) during pregnancy. Early in their pregnancy, women meet monthly and then every two weeks closer to their due dates. Multiple groups of women with similar due dates will meet each year. Belly check, heart monitor, positive nutrition, self-care (blood pressure, weigh-in, prenatal chart write-up) will be offered. The group setting affords expectant mothers with the opportunity to share stories, questions, experiences, and learn from each other. Participants become more informed, supported and confident. Post-partum, many par1/1/2009

Marquette, Michigan

CenteringPregnancy in a Rural Upper Peninsula Setting: Promoting Maternal, Neonatal and Newborn Health and Development through the Marquette, Michigan CenteringPregnancy Effort in Collaboration with the Marquette Family Medicine Residency

Upper Peninsula Health Education Corporation

Marquette, Michigan

The Strengthening Care (SC) demonstration project will yield improved health results for vulnerable elderly residents of Michigan's remote, rural Upper Peninsula already diagnosed with Type 2 diabetes through a combined approach of a) application of a Chronic Care Model and b) group visits in the clinical care setting educational programs and self-management. The program addresses diabetes and related complications which are leading causes of chronic illness, disability and death in the UP. Strengthening care: A model for clinical care enhancement and self management opportunities for diabetes in the primary care setting. The partners are Marquette General Health System, Portage Health Care System, Upper Peninsula Diabetes Outreach Network, Ferris State University College of Pharmacy and the Upper Stengthening Care: A model for clinical care Peninsula Health Education Corporation. Strengthening Care is a program to serve the residents of the Upper Peninsula of Michigan with improved diabetes care to a enhancement and self management opportunities for diabetes in the primary care medical underserved rural population. The program is based on the Chronic Care Model and will include the use of a clinical information system, a medical care delivery6/1/2009 setting

Upper Peninsula Health Education Corporation

The Health Careers Education Program for Upper Peninsula Youth (HCEP) sponsored by the Upper Peninsula Health Education Corporation (UPHEC), will provide educational and career training programs for 200 UP middle school and high school students to promote youth awareness of and entry into the healthcare professions. HCEP provides participants with a) summer jobs (at UP hospitals and long-term care sites), b) mentoring and “job shadowing” experiences (academic year and summer), c) organized meetings about preparing for (e.g. course requirements, GPA) and applying to (e.g. admissions and interview process) schools of healthcare professions, d) UP STARS (a mentoring group with physician-educators, medical residents and medical students for high school juniors/seniors and area pre-med Health Careers Education Program for Upper undergraduates) to assist in preparing for and applying to pre-med and medical Regional Upper Peninsula Peninsula Youth (HCEP): Developing Skills, school (including early admission) programs, e) presentations about healthcare paths of Michigan (all 15 Career Paths and Support Networks to by professionals (e.g. nurses, physicians, pharmacists, physical therapists, counties) Promote Entry into the Healthcare Professions psychologists, radiological technicians), UP healthcare professions students (e.g. in m3/1/2009

Upper Peninsula Health Education Corporation

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

On-going

$

150,000

On-going

$

400,000

On-going

$

350,000

N s

qu

d e tt

02262009

t s e

e R

t i m

ub

S

Submitted Requests - Not Approved

777 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Upper Peninsula Health Education Corporation

Valley City Environmental Services

Valley City Environmental Services

Valley City Environmental Services

Project Name

Project Description

Start Date

The Area Geriatric Education Scholars (AGES) program sponsored by the Upper Peninsula Health Education Corporation (UPHEC) provides summer and academic year training, orientation, education and 8-week paid job placements annually for 4060 UP high school juniors and seniors at 14 long-term care sites (LTCs) region-wide. Youth near-term career and job entry is facilitated as physical therapy assistants, certified nurses aides and activities personnel. Interim-term career entry is facilitated in jobs such as physicians, physicians assistants, nurses (R.N., L.P.N.), pharmacists, physical therapists, technicians, behavioral health professionals. AGES is promoted Area Geriatric Education Scholars Training and implemented in partnership with UP high schools, Health Occupations Students and Summer Jobs Program for Rural Upper of America (HOSA) chapters, Upper Peninsula Health Care Roundtable Peninsula Youth (AGES): Promoting Entry of (MichiganWorks!), Michigan State College of Human Medicine, UP universities, Regional Upper Peninsula High School Students into the Healthcare hospitals and media outlets. AGES participants a) assist with activities, b) learn of Michigan (all 15 Professions While Serving the Region’s about duties in nursing, physical therapy and activities, b) receive direct training from counties) Elderly Long-Term Care Population nurses and physical therapists, c) learn about geriatric health issues (e.g. Alzheimers 1/1/2009

Grand Rapids MI

Grand Rapids MI

P P A

250,000

Crt Cutting

This Maichine will separate the Funnel Glass from the panel glass and will create new jobs and reduce the cost of processing T.V.'s and computer monitors to residents and business's in the Mid-West. This process has less of an impact by itself because the glass has to be sent to a smelter and a smelter can only remove 90% of the lead and it still has to be sent to a land fill. upon approval

7 months

$

650,000

Computer Plastic Recycling

Valley City has completed their research and has developed a process for recycling al computer plastics together. This will allow Valley City to process recycled computer plastic in the United States (instead of shipping overseas), would creat a tremendous number of long term jobs and reduce the cost of electronics recycling in the entire mid west. upon approval

8 months

$

750,000

Wonderglass Machine

When the Analog to Digital Broadcast conversion was implemented there wasn't a plan to deal with the hazardous impact of the televisions being dumped into the land fills. This Machine removes 100% of the lead from the televisions and computer monitors (that have crt tubes) that need to be recycled. This project has a fantastic green impact and will reduce costs for electronic recycling every person and business in the mid-west. There is only one of these machines in existance and it is in Europe. upon approval

6 months

$

4,250,000

T O

d e tt

q e R

N s

st

Van Buren County Surveyor

18 Townships in Van Buren County

Remon of Government Survey Corners

Van Buren District Library

Covert Township, MI

New Covert Branch Library

The Van Buren District Library and Covert Township are building a new 5,000 branch library facility to replace an inadequate existing branch facility. 5/15/2009

Van Buren Township

Van Buren Township

Van Buren Township

Van Buren Township

DWRF Project - Contract 1 Linda Vista Utility Connections to Mission Pointe

Looping of water mains to eliminate disinfection by-products and chlorine decay, additional connection to Detroit water supply for necessary redundancy 7/1/2009 Removal of failing sanitary sewer pump station, looping of long dead end water mains subject to disinfection by-products and chlorine decay. 5/1/2009

Van Buren Township

Van Buren Township

Greenways Trail Project

Extension of non-motorized trail connecting township facilities to regional park assets. 7/1/2009

t i m

b u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

To remonument the corners of the public land survey system and set standardized markers at these corners. This will aid in the location and planning of roads, utilities and correct location of public and private property. This will provide for a central data base for Counties, Villages and Cities. The perpetuation of the Public Land Survey System is essential for the development of the State and Counties infrastructure and an accurate computerized geographic information system. This project has been underway for 16 years through the Remonumentation Grants and in Van Buren Count the project is about 42% complete. To continue this project this year it is shovel ready We can be in full operation in 30 days. Mar. 1, 2009

02262009

O R

Funding Request

On-going

e u

Grand Rapids MI

Expected Completion Date

Dec. 30, 2009

$

A Infra tie to the Government 2,900,000 Survey System

Jan. 31, 2010

$

1,100,000

10/1/2010 11/1/2009 6/1/2010

778 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Van Buren Township

Van Buren Township

Project Name Ecorse/Belleville Road Interchange Realignment

Van Buren Township

Van Buren Township

Ecorse/Haggerty Intersection and Ecorse Road Resurfacing

Van Buren Township

Van Buren Township

Van Buren Park Emergency Access

Van Buren Township

Van Buren Township

Replace washed-out culverts to reestablish land bridge to Van Buren Park peninsula 6/1/2009 Resurface Haggerty/Huron River Drive intersection to north, add traffic signal on East Huron River Drive/Haggerty Intersection offset intersection to south. 6/1/2009

Van Buren Township

Van Buren Township

Belleville Road Traffic Signal

Van Buren Township

Van Buren Township

Van Buren Estates - Sewer Rehabilitation

Van Buren Township

Van Buren Township

Ecorse Road Streetscape

Van Buren Township

Van Buren Township

Van Buren Township

Van Buren Township

Van Buren Township

Van Buren Township

Ecorse Road Sanitary Sewer Extension Edison Lake Road - Historical Bridge Rehabilitation French Landing Dam Embankment Improvements

Project Description Construction of separated boulevard intersection and access control to eliminate severe accident problem

8/1/2009

10/1/2010

Realignment of Ecorse/Haggerty intersection to improve capacity, reduce wait time and improve air quality. Resurfacing of Ecorse Road from Haggerty to I-275

8/1/2009

10/1/2010 10/1/2009

Install traffic signal to eliminate severe accident problem Relining and Rehabilitating sanitary sewers to eliminate inflow and infiltration and ground water contamination

s t s

-N

6/1/2009

Village of Berrien Springs

d e t

Project R3: Reclaim Restore Rebuild

tt i m

Village of Berrien Springs South Kimmel Street

b u S Village of Almont

Village of Almont

Village of Almont

Village of Almont

02262009

Replace 4" water Mains with 8"

Eliminate dead end water mains

11/1/2009

10/1/2010

8/1/2009

11/1/2010

8/1/2009

11/1/2010

7/1/2009

11/1/2009

7/1/2009

Close existing dead end 12" water mains in various locations in the Village. Thereby improving over all system pressure , fire flow and system flexability 7/1/2009

Submitted Requests - Not Approved

D VE

This is contingent on how many homes are in the inventory. This is a long term program.

To replace old road, storm sewer, sanitary sewer and water lines which were installed in approximately 1937. Replace road. Add new sidewalk ramps at street Could start in 180 intersections as needed. New sand subbase under entire road. days 2010, June

Replace 12,300 feet of 75 year old cast iron and cement asbestos 4" water main in various locations in the Village.

Funding Request

Route (Infrastructure Only)

7/1/2010

8/1/2009

Project R3: Reclaim Restore Rebuild is a community based training and home deconstruction and renovation project for home that the bank and governmental agencies have donated due to foreclosure. Residents will be trained in 2 different areas with varying tracks. The first area in on the physical plan for the properties. Track One on this area is on property assesmnet to determine which home are salvagable and which are not. Track Two will train the residents on the process of home deconstruction opposed to demolition so that as the materials from the deconstructed homes can be recycled and used in green renovations of the homes that are salvagable. The Third Track is on green renovation. Track Four is teaching the residents how to infuse green maintenance into their homes and what green development means comprehensively to a community that is ravaged with health issues due to the neighboring incenorator. The last track teaches the residents how to engage the community in the entire process. The second area of training revolves Proposed Start around the use of the homes after the renovation has taken place. Residents will be aDate is May 2009

q e R

11/1/2009

O R

6/1/2009

P P A

Boulevard enhancements to promote pedestrian movements, storm water runoff and quality and user perception. Addition of street lighting to improve safety Extend needed sanitary sewer capacity to 440 acre undeveloped industrial property. Elimination of obsolete pump station Provide pedestrian access to Huron River and associated township park lands. Relocate utilities from bridge deck. Elevate dam to protect downstream communities from flooding. Required improvements per FERC.

T O

Start Date

e u

Vanguard Community Development Detroit, Hamtramck, and Corporation Highland Park

Expected Completion Date

1/1/2010

1/1/2009

$

1,000,000

$

South Kimmel Street from Ferry Street to Park 870,000 Street

$

East St Clair;Hamilton;Alm ont Ave.;Juliet:Washin gton;Branch;Stone; Johnson;Day;Wate r; Spring; Centennial; 1,900,000 Sullivan; Maple

$

Van Dyke North:Kidder: Van Dyke South; East 2,200,000 St Clair.

779 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Almont

Village of Almont

Project Name

Project Description

Start Date

Total replacement of a 52 year old deteriorated sewage lift station. Prolonged failure of this facility would basement flooding in half of the Village. 5/1/2009

East S. Clair Lift Station

Village of Almont

Village of Almont

Water St., Sanitary Sewer Upgrade

Village of Almont

Village of Almont

Cherry Street Bridge

Village of Almont

Back-up water well Water Softener Replacement

Replacement of a 50 year old failing water treatment system.

Connection of Well 1 and Well 2

Village of Ashley

Village of Almont Village of Ashley/Elba Township Village of Ashley/Elba Township Village of Ashley/Elba Township

Replace 750 feet of 52 year old deteriorated 15" sanitary sewer with 24' pipe, and replace 3 deteriorated manholes. Failure of this sewer exposes the entire Village to basement flooding. 5/1/2009 Replace 60 year old deteriorated concrete and steel one lane bridge over a local open drain. 5/1/2009 Provide second stand-by back up well for emergency use when water service is interrupted. 5/1/2009

Waste Water Improvements Project

Run new water main from Well #1 to Well #2 to run both wells to the treament facility. 8/9/2009 Infrastructure repair to pump stations and lagoon/sewer services, structure to meet MDEQ requirements. 6/9/2009

Village of Ashley

Village of Ashley/Elba Township

Local Street Storm Drains

Repair and install Storm water drains along local streets to ensure the separation of storm and sewer water, assisting with capacity issues in our waste water collections. 5/9/2009

Fire and Rescue Emergency Response Improvements

Up grade Fire and Rescue facilities to accommodate new fire and rescue vehicles and equipment. The upgraded building will feature a new warning alert system and a community emergency shelter. 10/9/2009

Village of Ashley Village of Ashley

Village of Ashley

Village of Ashley/Elba Township

Expected Completion Date

s t s

9/1/2009

-N

The First Street Streetscape from Lemon Creek Road to South Street includes intersection improvements at Hills Road; sidewalk and curb and gutter removal for installation of bump-out sections at intersections of South Street, Hills Road, Center Street and Lemon Creek Road; furnishing and installing new energy efficient light poles and fixtures; planting trees and grates; installing benches, trash receptacles and other miscellaneous landscape features. Existing parking patterns will remain throughout the project limits. The current trend of designing streetscapes with a historical feel would further enhance the regional marketing of Michigan’s Great Southwest and would fit nicely with our slogan of “Casual Country Charm” and the fact that we are a centennial community. 5/1/2009

9/1/2009

O R

P P A 9/9/2009

T O

7/1/2009

July 1,2009

Funding Request

$

Village of Baroda

Village of Baroda

R d

Streetscape Project

e t t

t i m

b u S

Village of Baroda Village of Bellaire

Village of Baroda Bellaire

Village of Bellaire

Village of Bellaire

Village of Bellaire

Village of Bellaire

Warner Bridge

Reconfiguration of Derenzy Road- the only road to the County Airport from the Village 2010

Village of Bellaire

Village of Bellaire

Warner Bridge

Lagoon repair- our lagoon banks are eroding and need to be lined and stablized

02262009

Industrial Park Project

This project includes the construction of a new road, Industrial Park Drive, that would connect Hills Road and First Street, while providing access and infrastructure to 14+/acres for industrial use. Most of the Village's industry is located on the southern end of First Street, which is a dead end street. The construction of this new road will aid in diverting truck traffic through the industrial park rather than through the downtown area, thus helping to preserve the historic character and brick road on First Street. Water main upgrades are included on First Street from Church Street south to the the proposed Industrial Park Drive and on Hills Road from Industrial Park Drive north approximately 1,600' to loop the new water main. Hills Road will be reconstructed from Industrial Park Drive north to First Street in accordance with Berrien County Road Commission standards to accomodate the heavier truck traffic use. 4/1/2009 Warner Bridge Project Water Line Project - many of our water lines on the state highway were put in during the early 1930's and need to be replaced and repaired Unknown

Submitted Requests - Not Approved

2009

400,000 E. StClair at Kidder

D VE $

Water St., Bristol to Spring, & Spring, 200,000 Water to WWTP

$

400,000 Cherry S. Teeds

$

50,000 Research Drive

11/9/2009

$

350,000 n/a

9/9/2009

$

65,000 n/a

6/10/2009

$

601,000 n/a

7/9/2009

$

50,000 n/a

1/10/2009

$

545,000 n/a

$

First Street from Lemon Creek Road 600,000 to South Street

$ $

First Street from Church Street to Industrial Park Drive, Industrial Park Drive from First Street to Hills Road, Hills Road from Industrial Park 1,224,000 Drive to First Street 150,000

e u

eq

Route (Infrastructure Only)

10/1/2009

10/1/2009

$

300,000

2010

$

60,000

2010

$

90,000

780 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Village of Bellaire Village of Bellaire

Village of Berrien Springs

Village of Berrien Springs

Village of Berrien Springs

Village of Berrien Springs

Village of Berrien Springs

Village of Berrien Springs

Project Name

Project Description Repair and reconditioning of Warner Bridge

Warner Bridge

Start Date 2009

Expected Completion Date Funding Request 2009 $ 146,000

Village of Berrien Springs Shamrock Park Expansion

Environmental Restoration Project: Village owned Shamrock Park is located along the St. Joseph River and offers residents and visitors year round access to river oriented recreational activities. Due to the demolition of the old wastewater treatment plant, another 18+ acres is available for expansion. It is proposed that Shamrock Park expand onto this land which is adjacent to the park and create new camping sites along with infrastructure and roads. This project is recommended in the Village's five year Community Park, Recreation, Open Space and Greenway Master Plan 2008-Could start in 180 2012. days 2010, June

Village of Berrien Springs South Main Street

To replace old road, storm sewer, sanitary sewer and water lines which were installed in approximately 1937. Replace road. Add new sidewalk ramps at street Could start in 180 intersections as needed. New sand subbase under entire road. days 2010, June

Village of Berrien Springs South Main & South Mechanic

To relocate current sewer line, add sewer line to those houses not currently on the sanitary sewer. To replace the road, water, add sewer lines and storm sewer from Oak Street to end of S. Main and from Oak Street to end of S. Mechanic. This will add 4 houses and the boat club to Village sewer system, upgrade the road, water and storm sewer.

Village of Berrien Springs North Main Street

To replace old road, storm sewer, sanitary sewer and water lines which were installed in approximately 1937. Replace road. Add new sidewalk ramps at street intersections as needed. New sand subbase under entire road.

Village of Berrien Springs South Cass Street

To replace old road, storm sewer, sanitary sewer and water lines which were installed in approximately 1937. Replace 28' wide road, valley gutter. Add new sidewalk ramps at street intersections. New sand sublease under entire road.

Village of Berrien Springs Sylvester Avenue

Reconstruction of Sylvester Avenue from Shawnee Road to Broadway Street. Due to the high traffic due to schools on the road the road has deteriorated. The project will include new storm sewer, curb & gutter, sand sublease, gravel and HMA. Sidewalk ramps will also be replaced to meet ADA requirements. The proposed road width would be 30' back to back for the south half by the middle school nd 44' back to back for the north half in front of the high school to allow parallel parking on both sides.

Village of Beverly Hills Village of Beverly Hills

S

Village of Beverly Hills Village of Beverly Hills

02262009

A T

eq

s

st

e u

PP

O N

R d

e t tt

Evergreen Road Dam

The Rouge River Dam located just donwstream of the Evergreen Road Crossing in Beverly Hills has shown signs of detrioriation for many years. The dam needs to be rebuilt in order to maintain the integrity of the river system.

12/9/2009

$

650,000

$

South Main Street from Pitt Street to 760,000 Oak Street

$

South Main Street and South Mechanic Street from Oak Street to 640,000 end of each road.

$

North Main Street from Mars Street to 1,490,000 Village limits

$

From Park Street 870,000 to Ferry Street

$

Storm Sewer Sylvester Ave from Shawnee Rd to 480,000 Broadway Street

7/1/2009

11/15/2009

$

1,000,000

Madison Drainage Subdistrict Relief

The Village of Beverly Hills has identified a need to replace existing 18" and 24" diameter collector sewer along Beverly, Verona Circle and Madison with a new combined sewer ranging in size from 36" to 48". This upgrade existing sewer infrastructure to handle up to a 10-year storm event. Additionally, a storm sewer will be installed along Greenfiled Street to reduce the tributary for existing rear-yard sewers in the district. 7/1/2009

12/31/2009

$

1,314,000

Greenfield Corridor Drainage Relief

This project consists of constructing a new combined sewer along Madison, extending from Dunblaine to Kirkshire, that will collect flow from catch basins that are currently connected to the existing combined sewers in the district. The drainage from this district currenlty outlets to a 30" sewer on 14 Mile (Royal Oak sewer), which eventually connects to the North Arm Relief Drain. 7/1/2009

12/31/2009

$

320,000

i m

ub

Village of Beverly Hills Village of Beverly Hills

O R

D VE

Submitted Requests - Not Approved

Route (Infrastructure Only)

781 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Southfield Corridor Drainage Subdistrict

This project generally consists of replacing existing combined sewers with new sewers that are sized for the 10-year storm on Kirkshire and Birwood, east of Birmingham, and on Buckingham and Locherbie, east of Southfield Road. A new storm sewer is also proposed on Birmingham, that would connect to the sewer stub installed with the Acacia Park Relief sewer.

Village of Beverly Hills Village of Beverly Hills

GWK Drainage Area Improvements

This project consists of construction of 12" to 18" diameter combined sewers that would be sized for a 10 year storm event. The construction would occur along Verona Circle, Fairfax, Reedmere and Auburn Roads in the Village of Beverly Hills. 7/1/2009

Village of Beverly Hills Village of Beverly Hills

The Village has identified 137,000 feet of water main that has exceeded its usable life of 80 years. 40,000 feet of this water main has already been replaced, leaving Beverly Hills Water Main Replacement Project another 97,000 feet to complete the project 7/1/2009

Village of Beverly Hills Village of Beverly Hills

Village of Beverly Hills Village of Beverly Hills

Village of Beverly Hills Village of Beverly Hills

Village of Beverly Hills Village of Beverly Hills

Village of Beverly Hills Village of Beverly Hills

Village of Beverly Hills Village of Beverly Hills

Village of Bingham Farms

Village of Bingham Farms Village of Bingham Farms

$

305,000

12/31/2010

$

12,600,000

Acacia Park Drainage Area Improvements

This project provides for basement relief by construction of both combined and storm sewers. The new sewers will range in size from 12" to 24" in diameter in size and will provide capacity for a 10 year storm event. These improvements constitute the final pahse of the Acacia Park Relief Projects that commenced 10 years ago. 7/1/2009

12/31/2010

$

2,675,000

Priority 1 Sewer Rehabilitation

The Village of Beverly Hills has identified areas of the existing sewer infrastructure that has significant defects. These defective segmetns are located throughout the system and need to be rehabilitated . Many of the defective segments are in rearyeard easement areas and would be difficult to repair if a structural failure occurred.

7/1/2009

12/31/2010

$

550,000

Village of Beverly Hills Bridge Repairs

The Village of Beverly Hills conducted its biannual Bridge Structure Inventory and Appraisal in October, 2008. Based upon that Study, there were numerous repairs required for all five of the bridges within the Village. These repairs will extend the life of each bridge. 7/1/2009

12/31/2009

$

600,000

Replacement of Fire Apparatus

The Village is soon due to replace Tower 3-14, a pumper/arial apparatus equipped with a 55-foot ladder/waterway for delivering large master streams or personnel from an elevated position at a fire scene. A replacement vehicle would be a custom chassis apparatus having an 85-foot ladder/waterway, ground ladders, on board water tank and 1750 gpm pump, along with additional rescue/firefighting tools and lighting as well as a breathing appratus. 7/1/2009

12/31/2009

$

900,000

The building currenlty utilized for Public Works employees in in a state of disrepair and requires replacement. In addition, the building is not energy efficient and costly to heat. The Village of Beverly desires to replace this building with a more energyefficient structure. The new structure would be used for the storing of heavy equipment and machinery used to repair and maintain streets, bridges, sidewalks, dams, parks and water and sewer systems. 7/1/2009

12/31/2009

$

500,000

$

From Bingham Rd. to Hickory Hollow 245,000 Intersection

$

From Bingham Rd. to Hickory Hollow 245,000 Intersection

$

From 13 Mile Rd. north to end of 230,000 street

tt i m

d e t

Replacement of Public Works Building

ub

S

s t s

-N

Remove and replace 1500' of asphalt with stormwater drainage ditch improvements. Includes removal and replacement of subsurface. Aug. 1, 2009

Village of Bingham Farms Timber Trail Road Reconstruction

Remove and replace 1500' of asphalt with stormwater drainage ditch improvements. Includes removal and replacement of subsurface.

Village of Bingham Farms Fromm Drive Road Reconstruction

Remove and replace 1050' of asphalt with stormwater drainage ditch improvements. Includes removal and replacement of subsurface. 5/1/2009

Submitted Requests - Not Approved

O R

P P A

e u

q e R

12/31/2009

D VE

936,000

T O

7/1/2009

Funding Request

Route (Infrastructure Only)

$

Village of Bingham Farms Timber Trail Road Reconstruction

02262009

Expected Completion Date

12/31/2009

Oct. 30, 2009

Aug. 1, 2009

782 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Village of Bingham Farms

Village of Bingham Farms Shagwood Road Reconstruction

Village of Birch Run Village of Birch Run Village of Birch Run

Village of Birch Run Village of Birch Run Village of Birch Run

Village of Birch Run

Village of Birch Run

Village of Birch Run

Village of Birch Run Village of Blissfield Village of Blissfield Village of Blissfield

Safe Routes to School Trailway Sanitary Sewer Lagoon Expansion Sanitary Sewer Lift Station Upgrades

6/20/2009 7/20/2009 3/23/2009

10/31/2009 5/20/2010 5/31/2009

Water Loop Across CSX Railroad Tracks

This project involves the installation of a 12-inch water main beginning in the area of the existing water tower at the south end of Heath Street. The proposed main will cross beneath the railway and connect to the existing 8-inch water main at Church Street. This project will address a longstanding concern regarding back-up fire protection for the various homes and businesses that are west of the railway 7/20/2009

Village of Birch Run

I-75 Interchange Improvements

Extend the streetscape beautification project across the I-75 overpass. The interchange area of I-75 and Birch Run Road is the major entryway into the DDA. For safety reasons and enhancement of the nighttime interchange area, high-mast, multiple-lamp lighting should be installed 7/20/2009

O R

Village of Birch Run

Complete the DDA Streetscape Master Plan from Beyer Road east to the Dixie Highway, including the implementation of streetscape enhancements on Main Street Streetscape and Sidewalk Improvements and at the main entrance to the downtown area designed as “gateway” to the district, Enhancements including a proposed boulevard with center islands on either side of I-75 7/20/2009

Village of Birch Run Blissfield, MI Blissfield, MI Blissfield, MI

This project involves the installation of a 12-inch transmission waterline parallel with the existing 12-inch feed from the City of Saginaw’s pumping station at Town Line Road as a dedicated supply line to the Village’s distribution system. The project would benefit all users of the current system, as well as any future users, by providing additional fire flow and any increased future capacity that may be needed in light of Dedicated Water Supply Along Dixie Highway future growth and system improvements 7/20/2009 Bachmayer Little League Park Restroom Construction of new Bachmayer Little League Park Restroom facility Village Office/Police Station Construction of new Village Administrative Office and Police Station Water Plant Improvements Installation of sludge disposal equipment and related appurtanances

Village of Birch Run

Brooklyn

Brooklyn

02262009

S

d e t

M-46 Water Main Replacement / Extension

s t s

-N

q e R

1 mile of new water main construction is proposed to extend service along M-46 to the nearly 400-acre Renaissance Zone, enabling shovel ready land as viable for commercial, industrial, and residential development. Such development would lead to increased jobs and revenue for the Village, County of Gratiot, and State of Michigan. 5/9/2009

Detroit Street Extension

School St. Water Main

Replace 1,500 ft. 8" of a municipal water main due to age. Will also be replacing and installing new fire hydrants. This project is in accordance with the Village's Assest Management Plan for next year. 5/1/2009

Water Tower replacement

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

Shagwood from Bingham Rd. to 250,000 end of road

$

P P A

The existing water tower requires many structural repairs, painting, and makes insufficient water pressure to meet current and future needs. The project would replace the water tower with a new larger, taller tower which would increase the system's water pressure capability and allow for future growth. Replacement of all 4" or smaller water mains to 8" or larger mains also required. (12,000 ft. total length) The existing water system is losing more than 30% of pumped water due to aging pipes, resulting in inadequate pressure for fire protection. 6/9/2009 Remove old concrete and install a new road and cul-de-sac to better facilitate traffic in a retail area. 6/1/2009

m b u

Village of Breckenridge Village of Breckenridge

T O

5/1/2009

e u

itt

Village of Brooklyn

Start Date

Remove and replace 1500' of asphalt with stormwater drainage ditch improvements. Includes removal and replacement of subsurface. As part of the Safe Routes to School initiative, construct a path along Maple Road for kids to use to walk and/or bike to school Expand the Village’s lagoon system to service the entire Village Upgrade three of the Village’s sanitary sewer lift stations

Village of Breckenridge Village of Breckenridge

Village of Brooklyn

Project Description

Expected Completion Date

D VE $ $ $

780,000 1,000,000 500,000

11/14/2009

$

220,000

11/14/2009

$

1,200,000

11/14/2009

$

3,090,000

5/20/2010

$ $ $ $

3,730,000 45,000 1,250,000 850,000

8/9/2009

$

296,550

10/9/2009

$

2,755,000

8/1/2009

Detroit st. West of South M-50

9/1/2009

School St., between North M50 and Broad St.

783 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Brooklyn

Brooklyn

Project Name

Water Plant/Lift Station Generator

Project Description

Start Date

Expected Completion Date

Install a permanent generator that would power the Village's water plant and primary sewer lift station in the event of power outage. Currently the Village relies on a private contractor to supply the Village with a generator. The Village only owns one generato to power a water plant and three lift stations. If this generator is funded then the current generator will be used to keep the Village's other two lift stations running in case of area wide outage. 5/1/2009

Village of Brooklyn

Brooklyn

Irwin St. Water Main

Village of Brooklyn

Brooklyn

Constitution Water Main

Replace 800 ft. of 8" municipal water main due to age. Will also be replacing and installing new fire hydrants. Replace 1,500 ft of 12" municipal water main due to age. Will also be replacing and installing new fire hydrants.

Village of Capac

Village of Capac

Capac Road

3000' of Curb and Gutter, Drainage and Pavement Widening Improvements

Village of Capac

Village of Capac

St. Clair Street

350' of Curb and Gutter, Drainage and Pavement Improvements

Village of Capac

Village of Capac

Stevens Drive

600' of Drainage and Pavement Improvements

Village of Capac

Village of Capac

Park Street

800' of Curb and Gutter, Drainage and Pavement Improvements

Village of Capac

Village of Capac

Hunter Street

2,100' of Curb and Gutter, Drainage and Pavement Improvements

st

s

O R

5/1/2009 5/1/2009

PP

6/1/2009

9/1/2009

D VE

9/1/2009

Along M-50, at Village's northern border

Irwin St. from South M-50 to Sherman St. Constitution Ave. from South M-50 Meier Rd to the 1,450,000 south 3000' W Mill St to William 29,250 G W. Park St to dead 32,750 end

9/1/2009

$

5/1/2009

9/1/2009

$

5/1/2009

9/1/2009

$

5/1/2009

9/1/2009

$

5/1/2009

9/1/2009

$

Western two blocks 143,000 near school E Meier St to E. 162,500 Kempf Ct South of Koehn Rd to the north of Hunters Crossing 225,000 Blvd

A T

O N

7/10/2009

Funding Request

Route (Infrastructure Only)

Village of Capac

Village of Capac

Capac Rd Water & Sewer Improvements

Extend services to areas currently not servicable by the Village. Approximately 450' of 12" water main. Approximately 3,650' of proposed sanitary sewer. 5/1/2009

9/1/2009

$

Village of Capac

Village of Capac

Water Tower

Construct a new water tower to service community and fire department needs.

9/1/2009

$

8/1/2009

$

300,000 None

8/1/2009

$

Reduce parking pressure on M-81 425,000 in downtown.

Fall 2010

$

250,000 None

Fall 2011

$

2,218,075 None

Fall 2011

$

9,314,900 None

Fall 2011

$

10,636,775 None

9/30/2009

$

Village of Caro

Village of Caro

Village of Caro

Install Ultra Violet Disinfection System

Village of Caro

tt i m

Parking Lot Stabilization

d e t

ub

Village of Caro

Village of Caro

Village of Caro

Village of Caro

Village of Caro

Village of Caro

Village of Caro

Village of Caro

Water Distribution System Upgrade

Village of Chesaning

Village of Chesaning

BRIDGE CONSTRUCTION

S

02262009

Arts Center Rehabilitation Water Distribution System Upgrade

Water Distribution System Upgrade

e u

q e R

5/1/2009

Install a ultra violet disinfection system for the waste water treatment (wwtp) plant to replace chlorine and sulfur dioxide treatment of waste water. Improvements were originally in a waste water treatment plant bonded renovation project, however was deleted because of cost constraints. Improvements would increase employee safety and reduce environmental impacts because of reduction of chemical usages. ASAP In order to provide parking for businesses presently limited in customer parking, and old parking lots to be reconstructed and enchanced for additional parking. Is expected to help improve access to about a dozen businessess helping to stabilize their customer base. ASAP

Rehabilitate downtown church that is presently in jeopardy of deteriorating because of structural and drainage problems. Building presently used for performing arts center and art classrooms. Building lifespan will be limited without major renovation including drainage work, electrical upgrade and structural reinformcement. Fall 2009 Replace two inches or less diameter pipes in road right of way with eight inch pipe to improve water distribution and fire fighting capability. Fall 2009 Replace four inch in diameter pipes in road right of way with eight and twelve inch pipe to improve water distribution and fire fighting capability Fall 2009 Replace select six inch diameter pipes in road right of way with twelve inch pipe to improve water distribution and fire fighting capability. Fall of 2009 Remove Parshallburg Bridge from the Shiawassee River, remove approach spans, increas bridge elevation and place bridge and approaches. 7/20/2009

Submitted Requests - Not Approved

1,500,000

600,000

784 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Chesaning

Village of Chesaning

Project Name

Project Description

Start Date

SANITARY SEWER SYSTEM UPGRADES

Equipment replacement at the WWTP; Upgrade chapman lift station; place new digester cover and make capacity upgrades at the WWTP; construct a sanitary sewer lift station on Center Street; Extend sanitary sewer along Pearl Street between Clark and Wood Streets; Extend sanitary sewer on Fourth Street; Complete footing drain connections to storm sewers in Green Acres Subdivision 4/1/2010 Construct watermain loop in the NW quadrant of the village (14,000'); Paint the elevated storage tank; Extend watermain along Pearl Street between Clark and Wood Streets (600'); Abandon existing production well and drill new well w/ wellhouse; Extend watermain on Fourth Street south of M-57 (2,400') 4/1/2010

Village of Chesaning

Village of Chesaning

WATER SYSTEM UPGRADES

Village of Chesaning

Village of Chesaning

STORM SEWER SYSTEM UPGRADES

Village of Clinton

Village of Clinton

River Street sanitary sewer main

Replace Brady Street culvert; Construct village wide drainage improvements; Replace 320 lineal feet of undersized sanitary sewer main to properly handle the Village's flow.

8/1/2009

A T

12/11/2009

$

Marathon Road at 1,895,000 Holloway Reservoir

7/1/2010

$

4,500,000 M-134

R d

Grand River Sewer Main

Replace partially exposed sewer main in Grand River and connecting lift station

Village of Dimondale Village of Dimondale

Village of Dimondale Village of Dimondale

Sewer Plant Headworks SCADA alarm

Upgrade wastewater plant headworks and construct septage receiving facility Installation of SCADA alarm system for wastewater system lift stations

Rawson St. Pump Station

This project would be the installation of a sanitary sewer pump station. The current pump station is beyond it life cycle and in need of repair. With the replacement of this As Soon As pump station the village will reduce staff time Possible This project is the installation of a pump station that would replace the current siphon As Soon As system that is used on the east side of town. Possible

Dundee, MI

Village of Dundee

Dundee, MI

02262009

New Pump Station to Replace siphon

Submitted Requests - Not Approved

US-12 south to 115,000 Church Street

260,000 Pine and 4th Street

Remove and replace existing side by side pre-stressed concrete box beam bridge structure due to severe deterioration. Replacement bridge will be a pre-stressed concrete I-beam bridge. Load limits on bridge will be analyzed and restricted limits posted later this year. Project has been submitted for Critical Bridge funding in 2007 and 2008 but was not funded. The village will reapply for Critical Bridge funds again in 2009. 8/10/2009 Road, water and sewer infrastructure for development of the DeTour Area Business Park. 7/1/2009

Village of Dimondale

Village of Dundee

$

$

u q e

Village of Dimondale

S

11/1/2009

11/6/2009

Back-Up Well Construction

ub

4,800,000

155,000 NA

Abandonment and replacement of a Type I community water supply well. Existing we has exceeded life expectancy and is in danger of failing leaving the village without necessary firm capacity in their water system. The need for this project has been documented during the MDEQ's annual review of the village's water system. Project would place a new vertical turbine pump in the same aquifer with necessary hydrogeologic testing. The proposed well would be connected with new watermain to the existing system near the abandoned well and chemical injection equipment would be salvaged. The existing well house building would be removed and a new structure constructed over the new well. The village has begun preliminary work on this projec to obtain pricing from environmental and engineering firms and also obtain a quote from a well drilling company. 8/10/2009

t i m

$

$

Provide commercial and industrial customers with some energy efficient lighting fixtures, and provide residential customers with compact flourescent light bulbs.

DeTour Area Business Park

11/30/2011

3/1/2010

Energy Efficiency Program

e t t

1,710,000

9/1/2009

Village of Clinton

Marathon Road Bridge

$

O R 11/30/2010

$

Village of Clinton

Village of Columbiaville, Village of Columbiaville Marathon Township Village of DeTour Village DeTour Village

3,690,000

11/1/2009

River Street sanitary sewer main

Village of Columbiaville, Village of Columbiaville Marathon Township

D VE $

8/1/2009

Village of Clinton

t s e

Funding Request

Route (Infrastructure Only)

South of Clark Street to sewer 225,000 plant

Village of Clinton

O N

11/30/2011

PP

4/1/2010

Replace 950 lineal feet of undersized sanitary sewer main to properly handle the Village's flow.

s

Expected Completion Date

$

350,000

$

750,000

785 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Village of Dundee

Dundee, MI

Pump Station and Force Main to Plant

Village of Dundee

Dundee, MI

Roosevelt St. Sewer

This project would be the installation of a new pump station that would eliminate some of the sanitary sewer within the river flats and have been a source of SSO. With this As Soon As installation the village can eliminate a problem within our system Possible This project would be the installation of a new sewer on the street where there is no As Soon As sewer present. Possible

2nd Crossing US-23 to Plant

This project would include the boring of a new sanitary sewer main under US 23 to provide a second point of sanitary flow for the west side of the village. This new line isAs Soon As vital to the village to provide uninterruptable service to its residents Possible

Water Tower Demo

This project includes demolition of an existing water tower that has outlived its service life. With removal of this water tower the village will now have the use of approximately 2 acres for park land that will be made available to the community for As Soon As there enjoyment Possible The project includes demolishing the facility in order to open up the space for the community. This would include removing the building, tanks, and all piping to and from the site.

As Soon As Possible

As Soon As Possible As Soon As Possible

Village of Dundee

Village of Dundee

Dundee, MI

Dundee, MI

Expected Completion Date

A T

PP

O R

Funding Request

$

2,500,000

$

500,000

$

2,500,000

$

92,000

$

1,500,000

$

225,000

D VE

Village of Dundee

Dundee, MI

Water Plant Demolition

Village of Dundee

Dundee, MI

Green Technology feasible study

Village of Dundee

Dundee, MI

Hydro Power Generation for Old Mill

This study would allow the village to study to potential for sources of power such as hydro, wind, geothermal and solar at our facilities and city wide for our residents. This project would include restoring the power generating capabilities that was first installed by Henry Ford by using the dam and the River Raisin

$

250,000

Park Bathroom & Pavilion

This recreational project would include the installation of multiple bathroom facilities and pavilions to our park system. This project would increase our use of the villages As Soon As park system. Possible

$

250,000

Meter Replacement (650 meters)

This project would finish the conversion of our metering system. Once this project is complete the village will be able to reduce staff time while increasing the efficiency of As Soon As the reading and billing system. Possible

$

690,000

Brownfield- Bank Property Park

This project includes the redevelopment of approximately 10 acres that are highly contaminated with petroleum and coal products. This parcel is in the heart of the village and would like to be redeveloped as a park and walking path that would connect the Historic downtown to the New High school.

As Soon As Possible

$

550,000

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

$

270,000

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

$

560,000

Elm St. Water Main

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

$

100,000

Vannest St. From Pennfield to End

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

$

480,000

Pennfield St. Water Main

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

$

160,000

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

itt

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

02262009

d e t

Strawberry St. Water Main

Riley St. Replace with 12" Main

u S

bm

s

t s e

O N

qu

e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

786 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Project Name

Adams St. Water Main

As Soon As Possible

Pherdun Rd. to Wilcox loop under US-23

This project will provide a needed loop of our water system that is divided by US23. This water project will increase the overall pressure of the Village as well as provide an additional supply of water to our system

As Soon As Possible

Roosevelt St. loop Replace 4" Water Main

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

Wilcox Rd. new 12" Water Main

This project would be the installation of a 12" water main that would make available thousands of acres for development within the village limits and provide water to multiple residents that are currently on well.

As Soon As Possible

Dundee, MI

Washington St. Replace 4" Water Main

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

Dundee, MI

This project would be the installation of a 12" water main that would make available thousands of acres for development within the village limits and provide water to Rogers Rd. to Dundee-Azalia Road 12" Loop multiple residents that are currently on well.

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

350,000

$

450,000

$

400,000

$

1,200,000

As Soon As Possible

$

180,000

As Soon As Possible

$

830,000

Penfield New Sewer

This project would be the replacement of the existing sanitary sewer within the street. This replacement is needed to help increase the capacity of our system and solve As Soon As inflow and infiltration problems Possible

$

500,000

Slip Line, Plank St.

This project would line a sewer that in currently under a newly constructed road within the last couple of years. This lining will help the village eliminate the Infiltration As Soon As problem it receives. Possible

$

150,000

Move Bulk Water Station

The project includes relocation of the current bulk water station that is located in a residential area to an area in the industrial park. Moving this station will decrease the As Soon As destruction to residential street and place the heavy loads on the industrial roads Possible

$

65,000

This project includes the decommission of approximately 4000 lf of 8" water main. Once this water line is out of service it will help provide uninterruptable service to all village residents

As Soon As Possible

$

250,000

The project includes replacing all the water main on the street and upgrading the fire As Soon As hydrants to provide adequate water pressure for the homes and for fire suppression Possible

$

220,000

This project of 500lf of 12" water main would provide an adequate water loop to our system for the commercial district. This district provides services to the approximately 5 million visitors a year. This project already has a MDEQ permit.

As Soon As Possible

$

100,000

This project is taking out of service a section of water main that is under M-50 which is in constant repair. Removing this line from the system would help the villages ability 8" Water Main on M-50 in front of Arby's on M- to serve its community and also providing less interruptions in traffic on M-50 and US As Soon As 50 23 Possible

$

30,000

This project is the total replacement of the sanitary sewer and storm sewer on these street. These sewers are one of the oldest sewers within the village and is a cause of Inflow and Infiltration of clean water into the sanitary sewer system. This clean water needs to be removed from the entire system in order to help prolong the life of or As Soon As wastewater plant and reduce the cost of treating for our residents Possible

$

1,950,000

Decommission 8" Water Main M-50

Village of Dundee

Dundee, MI

Barnum St. Replace Water Main

itt

Dundee, MI

d e t

A T

m b u

S Village of Dundee

Dundee, MI

02262009

Strawberry St., Outer Dr., Elm St., Mechanic St.,South St. & Maple St. Replacement

s

st

e u

q e R

Freedom Court loop to M-50

Dundee, MI

Funding Request

$

Dundee, MI

Village of Dundee

Start Date

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

Village of Dundee

Village of Dundee

Project Description

Expected Completion Date

O N

Submitted Requests - Not Approved

PP

O R

D VE

Route (Infrastructure Only)

787 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Project Name

Project Description

Riley St. Replacement

This project is the removal and replacement of the sanitary on Riley street. Most of the sanitary was installed in the early 1900's and is a deep sewer. This sewer is also As Soon As the trunk line for the west side of town and a vital part of our collection system Possible

Manhole Rehabilitation

This project is the rehabilitation of the our sanitary sewer manholes that are throughout town. Our manhole system has many hand made brick structures that leak and need to be made water tight and/or replaced due to the nature of the structure.

Interceptor Laterals

This project would be the reinstallation of the sanitary taps that are present in the river flats. These taps need to be inspected to verify that the river water is not reaching our As Soon As sanitary system and if needed repaired Possible

Post Office Area Sewer Rehabilitation

This project was just established due to the fact that large sources of storm water is entering into the sanitary sewer. This was found during staff investigation and needs to be further investigated and need to be fixed. Once this clean water is eliminated As Soon As from our system it will help the village reduce the cost of treating to our residents Possible

Sump Pump Investigation & Remediation

This project would entail checking ever home to see if there footer drains are connected to the sanitary sewer. If a resident has an illegal then they would be assisted on removing this and in order to help to gain MDEQ standard compliance. Therefore eliminating this clean water from our system would be a vital part of this communities Inflow and Infiltration Reduction Program.

Purchase of 152 acre Industrial Park

Village of Dundee

Dundee, MI

Village of Dundee

Dundee, MI

Village of Dundee

Dundee, MI

02262009

$

400,000

As Soon As Possible

$

2,500,000

With the acquisition of this property the village can offer prime industrial land at very low cost. This park would offer multiple sized lots and would provide the village with As Soon As the ability to attract and sized company to locate here in Michigan. Possible

$

2,000,000

s t s

P P A

-N

150,000

$

300,000

Wastewater Membranes

This project would be the purchase of multiple cassettes of membranes to further expand our capacity and to replace any membranes that have been damaged or beyond their life cycle.

As Soon As Possible

$

800,000

Channel Monster/ Waste Plant

This project would include the installation of a Channel Monster and or Grinder pump to help the villages wastewater system run smoothly and help with the efficiency of theAs Soon As system Possible

$

115,000

3mm Venting Screen

This project would include the installation of the 3mm screen in our wastewater plant and provide the necessary screening needed to help protect our current membrane As Soon As system Possible

$

130,000

Replace Play Structure

This project would include multiple installations of age appropriate play equipment at As Soon As various parks throughout our area and help provide better service to our citizens Possible

$

250,000

$

45,000

d e t

Replace Wastewater Plant Drive

tt i m

ub

S

400,000

$

New Roof Community Center

Dundee, MI

$

O R

This system would be a back up system if our current membrane technology system if it would fail. With this system in place the village can provide uninterrupted treatmen As Soon As to the sanitary flows Possible

Dundee, MI

Village of Dundee

100,000

D VE

1,900,000

Village of Dundee

Dundee, MI

$

As Soon As Possible

$

Renovation of the Original Opera House and Purchase of Property

Village of Dundee

1,200,000

This project would be the renovation of the original opera house located in the historic downtown. The renovations would include bringing the building back to its late 1800 look and providing ADA access to the building. The village already owns two of the three total original buildings and would be looking to purchase the third to make this As Soon As project happen Possible The community center is in need of a new roof and truss system. This building is As Soon As used for multiple community events, concerts and gatherings . Possible

Dundee, MI

Dundee, MI

Funding Request

$

T O

Village of Dundee

Village of Dundee

Start Date

Expected Completion Date

e u

q e R

The installation of the fishing pier would provide Handicap access to one of the few ponds within the village limits and provide and additional fishing area to an area that Fishing Pier Pond at Stonebrook Subdivision only provides for shore fishing currently

Submitted Requests - Not Approved

As Soon As Possible

Route (Infrastructure Only)

788 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Dundee

Village of Dundee

Village of Dundee

Village of Dundee

Dundee, MI

Dundee, MI

Dundee, MI

Dundee, MI

Project Name

Project Description

Start Date

Expected Completion Date

8' Walk Path

This project would include the installation of multiple miles of 8' pathways with in the village. The project would also provide areas with benches, trash cans and informational kiosks for pedestrians walking throughout our community. With the completion of this project the village will have a non motorized pathway linking all areas of the community to the down town and also provide access to all commercial, retail, and industrial areas of the village

M-50 Street Lights

This project is the installation of street lighting along M50 from our east village limits to our west village limits. These lights are essential to provide lighting to the vehicles as well as the non motorized pathways. The lights will also create a corridor into our historic downtown.

South St. Water Main

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

Mechanic St. Water Main

This project will be the total replacement of the water line on the street with current AWWA standard material. These waterlines are sub standard and need to be replaces to provide adequate water for homes as well as adequate water supply

As Soon As Possible

Lift Station No 1 and No 2. Replacement Project

The existing wastewater collection system for the Village of Eau Claire utilizes two lift stations that ultimately convey wastewater to the treatment lagoons. Along with the other parts of the wastewater system, the lift stations were constructed in 1967 and have become outdated and exceed their useful life. Being old Smith & Loveless "tin cans", these stations do not have features of modern stations, are costly to maintain and/or update, and do not provide provisions for bypass pumping and automatic emergency electric generation. Therefore, the Village desires to construct two new modern lift stations that are necessary to protect the public health, safety and welfare. The new stations are also necessary to sustain the economic stability of the Village by assuring a reliable sanitary sewer system. The proposed lift stations will consist of submersible pumps, a standby generator with automatic transfer switch, bypass pumping chamber, and a telemetry system for alarm notifications. 4/15/2009

T O

Funding Request

Route (Infrastructure Only)

D VE $

1,200,000

$

1,100,000

$

140,000

$

140,000

10/1/2009

$

350,000 Main Street

10/1/2009

$ $ $

750,000 Hickory Street 268,000 343,000

October

$ $

1,258,500 1,200,000

5/1/2009

$

90,000

O R

P P A

N s

t s e

Village of Eau Claire

Village of Eau Claire

R d

e t tt

i m

b u S

250,000 Gallon Elevated Storage Tank Project Alley Improvement Dam Beach Improvement

Village of Eau Claire Village of Elk Rapids Village of Elk Rapids

Village of Eau Claire Elk Rapids Elk Rapids

Village of Elk Rapids Village of Elk Rapids

Elk Rapids Elk Rapids

River Street water and street project

Village of Elkton

Village of Elkton

Stabilization Lagoon Replacement

02262009

u q e

The Village of Eau Claire currently operates and maintains a 50,000 gallon multi-leg elevated storage tank. Assembled in 1957 and last recoated in 1986, the last inspection report of 2004 indicated sufficient structural integrity throughout. However, the existing tower coatings have exceeded their life expectancy and are in need of recoating at an approximate cost of $250,000. Furthermore, the existing tower does not meet current OSHA standards relative to fall prevention and access opening sizes and adds additional costs to a rehab project. Therefore, the Village finds it prudent to construct a new water tower to meet its water supply and storage needs for the next 40 years. The new water tower will be at an increased size and avoid spending on a tower that will not meet future needs. With average and maximum daily demands of 150,000 gpd and 400,000 gpd, respectively, the proposed tower will have a capacity of 250,000 gallons. This ize will also meet the fire flow requirements within the Village. Demolition of the existing tower is included in the provided project cost. 4/15/2009 Bury all utilities, install LED street lighting, 90 tons of ashphal Paving (560 ton ashphalt), install raingardens, LED lighting, restroom 2,460 L.F. 8" water main, Well house modificatons, 2,700 l.f. curb,16,000 l.f sidewalk, 1,620 tons ashphalt May Street to water hook-up & third wel Number 3 cell discharge structure has cracks in walls and ice damage. Cracks have become very visible and need to be replaced. 4/1/2009

Submitted Requests - Not Approved

789 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Village of Elkton

Village of Elkton

Alley Resurfacing

800' of Curb and Gutter, Pavement Improvements

6/1/2009

8/1/2009

Village of Elkton

Village of Elkton

High Street

800' of Water Main, Storm Drains, Curb and Gutter,Pavement Improvements

6/1/2009

8/1/2009

Village of Elkton

Village of Elkton

Clark Street

835' of Water Main, Storm Drains, Curb and Gutter,Pavement Improvements

6/1/2009

8/1/2009

Village of Elkton

Village of Elkton

Railroad Street

885' of Water Main, Storm Drains, Curb and Gutter,Pavement Improvements

6/1/2009

Village of Elkton

Village of Elkton

York Street

900' of Water Main, Storm Drains, Curb and Gutter,Pavement Improvements

6/1/2009

Village of Elkton

Village of Elkton

Brown Street

1000' of Water Main, Storm Drains, Curb and Gutter,Pavement Improvements

6/1/2009

Village of Elkton

Village of Elkton

Maude Street

Village of Elkton

Village of Elkton

Village of Elkton

Village of Elkton

Village of Elkton Village of Ellsworth

Village of Elkton Ellsworth

Village of Farwell

Village of Farwell

Village of Farwell

Village of Farwell

Village of Farwell

Village of Farwell

Village of Farwell

Village of Fowlerville

Farwell

Farwell

55,000

$

332,000

$

346,500

$

367,250

PP

8/1/2009

$

373,500

8/1/2009

$

415,000

6/1/2009

8/1/2009

$

539,500

6/1/2009

8/1/2009

$

5,007,750

6/1/2009

8/1/2009

$

100,000

5/1/2009

8/1/2009

$ $

Mill St to south of 500,000 Clark St 3,500,000

N. Superior Street Improvements

Reconstruct N. Superior St. from RR tracks to Maple Grove Rd., including recycling existing asphalt, drainage improvements, curb/gutter, new asphalt pavement, concrete sidewalk to athletic complex and miscellaneous restoration.

6/1/2009

11/15/2009

$

450,000 N. Superior St.

S. Hall Street Improvements

Reconstruct S. Hall St. from Main St. to Tobacco River bridge, including recycling existing asphalt, drainage improvements, curb/gutter, new asphalt pavement, concrete sidewalk and miscellaneous restoration

6/1/2009

11/15/2009

$

611,000 S. Hall St.

Construct a new street within Illinois St. ROW from Superior St. to Weber St., including new sanitary sewer, drainage improvements, earthwork, new curb/gutter , aggregate base and asphalt paving.

7/1/2009

11/15/2009

$

202,000 Illinois St.

$

215,000 Ellen st.

11/15/2009

$

225,000 Hay st.

Ohio St. watermain improvements

Replace existing small diameter water main from Corning St. to Superior St.with new 8" dia. Watermain, replace existing services, and restore existing roadway with recycled aggregate base and asphalt pavement roadway. 7/1/2009

11/15/2009

$

262,000 Ohio St.

Wright St. Water Main Improvements

Replace existing small diameter water main on Wright St. from Michigan St. to Ellen St. with new 8"dia. Watermain, replace existing services and restore roadway with recycled aggregate base and asphalt pavement. Add curb/guttes and storm sewer from Main St. to Michigan St.

11/15/2009

$

270,000 Wright St.

$

Local school bus route to major roads within the Village of 730,000 Fowlerville

A T

Illinois St. Construction

d e t

e u

st

q e R

s

O N

Ellen St. Water Main Improvements

Farwell

Replace existing small diameter water main from Ohio St. to Main St. with new 6" dia. water main, replace existing services, and restore existing roadway with recycled Hay St. Water main improvements and storm aggregate base and asphalt pavement. Add curb/gutter and storm sewer from Main sewer improvements St. to Michigan St. 7/1/2009

itt

m b u

Farwell

S

Village of Fowlerville in Handy Township, Michigan

02262009

Hibbard Street Reconstruction

O R 8/1/2009

Replace existing small diameter water main on Ellen St.. from Corning St. to Superior St. with new 8"dia. Water Main, replace existing services and restore roadway with recycled aggregate base and asphalt pavement. 7/1/2009

Farwell

Farwell

Behind bussinesses east and west of N. Main St. Cleveland St to McKinley St S. Main St to Mullen St N. Main St to Drettman Dr N Main St to Madgison St Smith St to N. Main St Whalen St (M-142) to dead end Smith St to Madgison St

$

1,300' of Storm Drain, Curb and Gutter, Pavement Improvements 1000' of West McKinley needs water main, storm drains, curb and gutter, and McKinley Street pavement. 925' of East McKinley will be strom drain only. Construct a new well & well houseat the end of York Street and connecting the new York Street Well & Well House well to the East well. Remove and replace the storm sewer system from Whaleen to Eby Road. The road South Main Street Storm Sewer Replacement will also be reconstructed with a new all-season roadway. Wastewater Treatment System

Farwell

Funding Request

Route (Infrastructure Only)

Reconstruction of watermain, sanitary sewer, storm sewer, and road. $730,000 project

Submitted Requests - Not Approved

7/1/2009

5/9/2009

9/9/2009

D VE

790 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Fowlerville

Village of Fowlerville

Village of Fowlerville in Handy Township, Michigan

Village of Fowlerville in Handy Township, Michigan

Project Name

Project Description

North Collins Street Reconstruction

Start Date

Reconstruction of watermain, sanitary sewer, storm sewer, and road. $460,000 project

Village of Galien

Village of Galien

Village of Galien, Galien Township

$

Local school bus route to major roads within the Village of 460,000 Fowlerville

9/9/2009

$

Major traffic route within the Village of Fowlerville which is also part of our 2,200,000 truck route.

All developed 4,935,000 portions of Village

6/9/2009

O R

D VE

Reconstruction of watermain, sanitary sewer, storm sewer, and road. $2.2 million project

Municipal Water System

Construction of a new municipal water system including a water tower, 3 wells, an iron removal water treatment plant, installation of water main and water services, and restoration to address fire protection and water quality. The Village has completed all the engineering and environmental reports and clearances and previously received a preliminary commitment for USDA RD loan/grant. However, the cost to the users was still going to be too high and the project was put on hold. The system is needed to provide fire protection to the developing industrial park and residents, treat the water which is extremely high in iron and hardness, and provide the required water so the old, shallow and insufficient wells can be abandoned. The water system is also an integral part in the stimulation of economic development in the downtown area. The Village is an impoverished community and has lost much of it's industry. However, the Village is poised due to it's proximity to the surrounding developing areas in Indiana and west in the New Buffalo Area. 9/1/2009

11/15/2010

$

Second Street Drainage Improvements

The norther portion of the Village experiences frequent flooding due to very poorly drained, heavy clay soils, flat terrain and limited drainage. Previous studies have identified that the problem can be corrected by a combination of a new storm outlet, cleaning and increasing the size of existing storm drains and connecting them to an existing county drain.

11/1/2009

$

750,000 Second Street

7/1/2010

$

300,000 Seneca Street

11/1/2010

$ $

Village of Goodrich

Wheelock & Watkins Drain Enclosure

Village of Goodrich Village of Hillman

Village of Goodrich Village of Hillman

Hegel Road Bridge Dam

Village of Hillman

Village of Hillman

Village of Hillman Village of Hillman

Village of Hillman Village of Hillman

Village of Hillman

Village of Hillman

Village of Hillman

Village of Hillman

Village of Hillman Village of Hillman Village of Hillman

Village of Hillman Village of Hillman Village of Hillman

Village of Hillman

Village of Hillman

e t t

b u S

t i m

N s

st

e u

eq

5/9/2009

P P A

6/1/2009

Replacing the existing undersized and outdated material for approximately 1,200 feet with a 30-inch concrete enclosed drain. This drain currently floods homes and businesses during major rain events. 3/1/2009

R d

Village of Goodrich

02262009

4/9/2009

Funding Request

Route (Infrastructure Only)

South Grand Reconstruction

T O

Village of Galien

Expected Completion Date

Replacement of the existing dam, which contains three flood gates, with a stream naturalization, including a spillway which will control the Mill Pond water level. Develop airport master plan

3/1/2009

1,000,000 West Hegel Road 40,000

1600 LF of New 8" Water main from Lynn Street to and along Riverside Drive

$

65,000

Connection of the recalculating Hot Water Supply and return lines to the Power Plan Sewer on south side of Hillman Construction of 916 LF of Park Drive including curbed entrance and cul-de-sac, North of Carrier Road in the Industrial Park 2165 LF of New 8" Sanitary Sewer along State Street, Lowell Street and Connon Road Reconstruction of Carrier Road to Class A standards from Industrial Park Drive to the West End of the Industrial Park Property, Approx 1200 LF Rehabilitate existing medium intensity airfield lighting Rehabilitate runway 04/22, taxiways and parking apron Clearing, Grubbing, Leveling of the Industrial Park Lots, including drainage improvements, drive entrances and wetland mitigation

$ $

85,000 100,000

$

115,000

$

130,000

$ $ $

150,000 175,000 435,000

$

541,000

Submitted Requests - Not Approved

791 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Village of Hillman Village of Hillman

Project Name

Project Description

Start Date

Expected Completion Date

Walkable Communities

$

Water System Improvements

Upgrades to municipal water system to improve drinking water quality and fire fighting capability by completing watermain loops, replacing aging 4" watermains that are failing and installing cathodic protection on water tower to extend life. 7/9/2009

6/10/2009

Village of Howard City Village of Howard City

Shaw Street Improvements

Add left turn lane to improve traffic flow, add sidewalk to encourage walking and improve safety, add lighting for safety, add trees/plantings and improve storm water flow and quality.

6/10/2009

Village of Howard City Village of Howard City

Waste Water System Improvements

Upgrades to waste water treatment Plant and sewer system to reduce storm water I&I and improve treatment and plant effluent quality and meet permit conditions 7/9/2009

Village of Howard City Village of Howard City

Village of Howard City Village of Howard City Village of Kalkaska Kalkaska Village

Downtown Infrastructure and Street Scape GIS

Village of Kalkaska Village of Kalkaska Village of Kalkaska

Kalkaska Village Kalkaska Village Kalkaska Village

Pedestrian Safety Improvements Sewer Lift Station Upgrades Septage Receiving Faciltiy

Village of Kalkaska Village of Kalkaska Village of Kalkaska Village of Kalkaska Village of Kalkaska Village of Kalkaska Village of Kalkaska

Kalkaska Village Kalkaska village Kalkaska Village Kalkaska Village Kalkaska Village Kalkaska Village Kalkaska Village

First Street upgrade Phase II Watermain Water Meter Upgrade Streetscape Intersection Improvements LED Streelights Phase I Watermain

Village of Kalkaska

Kalkaska Village

WIFI

Village of Kingsley

Village of Kingsley

Pearl Street Reconstruction

Village of Kingsley

Village of Kingsley

Blair Street Reconstruction

Village of Kingsley

Village of Kingsley

d e tt

t i m

ub

Spring Street Reconstruction

s t s

2,000,000

$

900,000

$

2,630,000

12/10/2009 6/30/2010

$ $

1,500,000 85,000

11/30/2010 11/30/2010 11/30/2010

$ $ $

US-131 and Third 275,000 St 495,000 1,675,000

5/1/2010 5/1/2010 5/1/2010 5/1/2010 5/1/2010 5/1/2009 6/1/2009

11/30/2010 11/30/2010 11/30/2010 11/30/2010 11/30/2010 11/30/2010 11/30/2009

$ $ $ $

3/1/2009

6/1/2009

$

8/1/2009

7/1/2010

$

8/1/2009

7/1/2010

$

Pearl Street from 440,000 Fenton to Main Blair Street - Elm to 480,000 Brownson

8/1/2009

7/1/2010

$

Spring Street from 500,000 Fenton to Blair

$

Parts of CR 610, CR 665 and CR 667 within the Village limits (2,02 miles) and the local 600,000 streets (1.98 miles)

7/9/2009

O R 6/10/2009

P P A

-N

e u

Upgrade First Street to Class "A" status Case Iron Watermain Replacement Phase II Upgrade meter reading system to be WIFI compatible Streetscape along US-131 and M-72 Intersection Improvements Convert existing Street lights to LED (approx 40) Cast Iron Watermain Replacement Phase I Wireless Internet Access to Commercial District; expandable to entire Village and County Reconstruct Pearl Street along with new sanitary sewer and completion of a water main loop. Reconstruct Blair street along with storm sewer and sanitary collection system reconstruction.

q e R

D VE $

Aesthetic and infrastructure improvements covering a three block stretch along Edgerton Street - one block west of Ensley to the existing White Pine Trail and two blocks east of Ensley Street (Federal Highway) that serves as the major north/south arterial. Aesthetic improvements will include: bumpouts, decorative crosswalks, street trees, benches, trash receptacles, decorative sidewalk paving, street lights, flower planter pots, drinking fountain and bicycle racks. Also includes aesthetic improvements covering a two block stretch along Ensley Street from Williams Street to Shaw Street strengthening the connection to the White Pine Trail will increase the draw from the trail into the downtown area for shopping and dining. 8/10/2009 County/Village GIS system 6/1/2009 Construct pedestrian island w/landscaping on US-131 downtown for pedestrian safety purposes 5/1/2010 Updgrade three sanitary sewer lift stations 5/1/2010 Construct Septage Receiving Facility with limited pretreatment of septage 5/1/2010

T O

Reconstruct Spring Street along with storm sewer and sanitary sewer system reconstruction.

$ $

S Village of Lake Ann

Village of Lake Ann, Michigan

Village of Lake Isabella Lake Isabella

02262009

Paving of Village of Lake Ann Streets

Repaving of 4.0 miles of deteriorating Village streets. The local streets were last paved in 1985 and CR 610 (Maple Street) was last repaved in 1990.

5/1/2009

5/30/2009

Lighting Rehab

Replace existing/failed lighting system at the Lake Isabella Municipal Airport

6/1/2009

11/1/2009

Submitted Requests - Not Approved

Funding Request 650,500

Route (Infrastructure Only)

First Street/Island 675,000 Lake Rd 1,855,000 500,000 1,275,000 US 131 and M-72 US 131 and M-72 220,000 475,000 75,000

792 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Village of Lake Isabella Lake Isabella

Decentralized Wastewater

Creation of three cluster sewer systems to service southern Lake Isabella

7/1/2009

12/31/2009

Village of Lake Isabella Lake Isabella

Natural Gas Expansion

Expansion of natural gas network

7/1/2009

10/1/2009

Flint / Broadway Paving & Streetscape Improvements

The scope of the project includes streetscape and aestehetic improvements within Historic Downtown Lake Orion, Including: the milling and full depth base repair of deep strength bituminous material, concrete curb, ADA sidewalk installation, and storm sewer repair on Flint and Broadway Streets. Streetscape improvements include; burying of above ground utilities, installation of reclaimed historic brick paver sidewalks, installation of trees, Lights (LED globes), and recycled street furnishings. 6/1/2009

Second St & James St Improvements

The project includes the reconstruction of 2nd St (St. Joseph St. to James St) and James St (2nd St. to Paw Paw St.) including drainage improvements in the area and the repaving of the village's municipal parking lot located west of Paw Paw St. and North of St Joseph St. 5/15/2009

Wastewater System Upgrades

Village of Lake Orion

Village of Lawrence

Village of Lake Orion

Village of Lawrence

Village of Lawton

Village of Lawton

Village of Lawton

Village of Leonard

Village of Leonard,Addison Township

Village of Leonard,Addison Township

7/30/2009

$

The Village has a 250,000 gallon wastewater treatment plant. The plant does not have any screening to remove grit, rags, debris, etc. that clogs up the pumps and equipment. The plant uses timers and coarse bubble diffusers for treatment which is inefficient and uses a large amount of electricity. The improvements include the installation of an automated screen to remove the debris before it enters the plant. This will also prevent this debris from being land applied to farm fields with the residual solids. Other improvements include the addition of oxygen sensor probes and conversion from coarse to fine bubble aeration to reduce the blower run times, energy consumption and costs to operate. In addtition to reducing the carbon footprint, these improvements will have a 4-7 year payback. 8/1/2009

11/15/2009

$

Wastewater 350,000 Treatment Plant

Water System Improvements Project

The Village's water system reliability study has indicated a need to improve the system pressure and fire flows to meet current Clean Water Act standards. The western portion of the system has less than 25psi of pressure and can only provide 3 minutes of fire protection for the middle and high schools in the area. These deficiencies are largely a result of the requirement to abandon a well in this area due to the arsenic levels. The Village water system also provides large quantities of water to Welch's for processing and making grape juice. Welch's has expanded and the water system must be expanded to keep up with their needs and allow them to continue to expand and add jobs. The undersized mains and water tower are not capable of providing a safe reliable water supply. 9/1/2009

11/15/2010

$

Various areas 3,550,000 within the Village

Leonard Sewage Treatment Operation

Construction of a waste water treatment facility and associated system is necessary. The Village of Leonard is experiencing a high failure rate of septic systems (only waste treatment available at this time), July, 2009

July, 2010

$

3,000,000 Village of Leonard

itt

m b u

S

D VE see project descriptiondescripti 475,000 on

T O

Village of Lawton

P P A

O R 12/1/2009

Funding Request

d e t

Division Street Drainage Program

st

e u

q e R

N s

Replace existing underground clay tile drainage pipes with PVC pipe to drain street and properties to relieve flooding

Mackinaw City

Wastewater Treatment Plant improvement

$

4,000,000

Village of Mancelona

Mancelona

Upgrade watermain along East St.

$

65,000

Village of Mancelona

Mancelona

Upgrade watermain along State St

$

72,000

Submitted Requests - Not Approved

May, 2009

August, 2009

$

East Division Street from Forest St. to Open Ditch 26,000 (approx. 1300 feet)

Village of Leonard Village of Mackinaw City

02262009

Route (Infrastructure Only)

793 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Village of Mancelona

Mancelona

Refurbish existing wells

$

81,000

Village of Mancelona

Mancelona

Relocate well

$

120,000

Village of Mancelona

Mancelona

$

150,000

Village of Marcelus

Marcellus,Mi

Watermain extensionalong East St We are currently looking to build a park and ride lot for the transportation of large sem and for the use of local residents that are carpooling to work.

Property located on east M-216 next to the Dollar General

Village of Marcelus

Marcellus,Mi

Dibble Street Drainage Issue

Village of Mayville

Mayville

Industrial Park Phase II

Village of Mayville

Mayville

Industrial Park Phase III

We are currently working with Wightman & Associates to fix the sever drainage problem that we are having on Dibble Street. We have an incomplete storm and sewer system here and in other areas of the Village that are causing severe flooding. We are looking to preserve teh publics health and safety. 8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension 3/1/2009 8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension 3/1/2009

Barrows Street Parking Lot

Construct a 30+ space parking area and define the limits of Barrows Street through placement of curb and gutter, storm sewer and HMA pavement. The project area is currently a large gravel surface and is undefined for motorists. Parking occurs in a haphazard fashion and traffic (including commercial traffic from an adjacent industrial site) often cuts through the parking area. This project is a high priority for both the village and village DDA and is needed to provide safe, well-lit parking for the downtown businesses. The project will complement recent efforts by the village and business owners to update downtown through several facade projects, sidewalk construction and the recent road resurfacing and streetscape enhancement on High Street.

Village of Metamora

Village of Metamora

Village of Metamora, Metamora Township

Village of Metamora, Metamora Township

t i m

d e tt

T O

Wastewater Stabilization Lagoon Expansion and Improvement

$

P P A

O R

400,000 Main st to Dibble St

4/1/2009

$

190,000 M-24

4/1/2009

$

195,000 M-24

$

High/Barrows 250,000 Streets

N s

Construction of a third lagoon, aeration ponds with equipment and additional piping on the village's property to provide additional capacity, improve discharge sequencing and improve effluent water quality. This project was originally designed, permitted and bid in 1999 but was not built due to lack of funding. To initiate this project again the plans will need to be updated and submitted for new permits. The project will address issues the village has with high phosphorus levels in the effluent and the need to decrease their annual discharge to meet their Total Phosphorus output limits. In addition, the village has been unable to connect new users on existing vacant parcels within the village, in three approved residential developments and two potential commerical developments because of lack of capacity in their treatment system. The village collection system has capacity to bring these additional flows to the lagoons. The construction of this expansion will allow the village to grow economically and attract new industrial businesses into the village. August, 2009

40,000 M-216 East

$

st

e u

q e R

D VE

Route (Infrastructure Only)

August, 2010

$

2,900,000 Oak Road

b u S 02262009

Submitted Requests - Not Approved

794 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

Village of Middleville

Village of Middleville

Barry County, MI

Village of Middleville, MI

Finkbeiner/Crane Street and Bridge

Third Street and First Street Watermain Imp.

T O

Village of Middleville

Village of Middleville, MI

e u

02262009

R d

e t tt

Johnson Street from LemPaul to M-37

i m

b u S

Village of Middleville, MI

5/1/2009

The proposed project will replace 2 inch and 4 inch watermains with 8 inch including services and reconstruct the road. 5/31/2009

eq

Village of Middleville

s t s

East Side Lift Station Replacement.

The proposed project includes replacing the 4-inch watermain with a new 6-inch watermain, replacing the 8-inch sanitary sewer and reconstructing the road with curb and gutter. 5/31/2009

The existing facility was designed and built in 1971-1972. There have been a few modifications to the controls over the years, but the basic equipment is 37 to 38 years old. Maintenance, operations and repair costs continue to rise. Parts are difficult to come by and are often fabricated as replacement parts are unavailable. this facility represents a srevious environmental threat to the Thornapple River and surrounding ecosystem. The facility also requires daily confined space entry for normal operations and maintenance. 5/31/2009

Submitted Requests - Not Approved

D VE

P P A

The proposed project involves reconstruction of an existing county road and construction of a road extension with a new bridge over the Thornapple River and a bridge over Spring Creek.

-N

Funding Request

Route (Infrastructure Only)

12/1/2010

Nov. 15, 2009

Nov. 15, 2009

Nov. 15, 2009

$

800 feet of Crane Road west of the Intersection of Crane Road and Whitneyville; acquistion of new right-of-way and construction of a 2500 foot roadway extension from the terminus of Crane Road west of the Crane Road/Whitneyville Road intersection 10,916,758 on the e

$

Watermain Replacement in Third Street from Sunset Ridge to M37 and in First Street from Second Street to Third 108,530 Street

$

Reconstruction of Johnson Street from LemPaul to M37 including the upgrading of the water main and 187,304 sewer utilities.

$

Construct a new sanitary lift station east of the Thornapple River and remove the existing obsolete lift 450,000 station.

795 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Village of Middleville, MI

Village of Morrice

Village of Morrice

Lagoon Building Renovations

Village of Morrice Village of Morrice

Village of Morrice Village of Morrice

Village Hall Renovations - Fire Hall Logoon System

The proposed 12-inch water main would provide an important looping of the north end of the water system providing enhanced reliability and fire protection to residents and businesses in the north part of the Village. 5/31/2009 Improve energy efficiency - add insulation, new siding, doors, windows, roof; install solar panels; change to LED lighting 6/1/2010 Improve energy efficiency - add insulation, new siding, entry doors, garage doors, windows, roof; change to LED lighting 6/1/2010 Additional lagoon to increase capacity 6/1/2009

Village of Morrice Village of Morrice

Village of Morrice Village of Morrice

Library Building Renovations Street Lights

Improve energy efficiency - add insulation, new siding, doors, windows, roof; install solar panels; change to LED lighting; energy efficient heating and cooling system Replace Street Lights with LED fixtures

DPW Building Renovations

Improve energy efficiency - geothermal heating and air conditioning system; add insulation, new siding, doors, windows, roof; change to LED lighting; addition for inside equipment storage 9/1/2009

Village of Morrice

T O

N s

t s e

9/1/2009 12/1/2009

qu

$ $

100,000 1,000,000

3/1/2009 6/1/2009

$ $

75,000 100,000

3/1/2009

$

150,000

125,000

12/1/2009

$

100,000

Morrice Community Senior Center Building Renovations Sewer System Rehabilitation

Improve energy efficiency - geothermal heating and air conditioning system; add insulation, new siding, doors, windows; change to LED lighting; new roof system to eliminate flat roof; solar panels; rehabilitate basement storage space into useable work space with improved ventilation; drop ceiling and replace flooring in gymnasium 6/1/2009 Install additional shut-offs 6/1/2009

12/1/2009 12/1/2009

$ $

200,000 100,000

Newberry Water System Upgrade

Upgrades and enhancements to the Village of Newberry municipal waters system.

7/1/2010

$

10,000,000

Village of Morrice

Improve energy efficiency - close existing garage to create more office space; addition of larger garage to accommodate two cars, add insulation, new siding, doors, windows, roof; restructure heating and cooling duct work for more efficiency; change Village Hall Renovations - Police Department to LED lighting 6/1/2009

02262009

12/1/2009 12/1/2009

$

Village Hall Renovations

u S

100,000

12/1/2009

Village of Morrice

Village of Newberry

$

100,000 50,000

Village of Morrice

Village of Newberry

12/1/2009

$ $

Transfer Station Building Renovations Streets

Village of Morrice Village of Morrice

$

3/1/2009 12/1/2009

Village of Morrice Village of Morrice

Village of Morrice Village of Morrice

Nov. 15, 2009

D VE

Improve energy efficiency - add insulation, new siding, doors, windows, roof; install solar panels; change to LED lighting; energy efficient heating and cooling system with in-floor heating 9/1/2009 Mill and resurface Melladee Lane 6/1/2009 Improve energy efficiency - geothermal heating and air conditioning system; add insulation, new siding, doors, windows, roof; change to LED lighting 6/1/2009

Village of Morrice Village of Morrice

Village of Morrice

Funding Request

d e tt

it

bm

e R

Submitted Requests - Not Approved

7/1/2009

Route (Infrastructure Only)

Watermain improvements in Finkbeiner Road/Crane Road from M-37 to Grand Rapids Street in Finkbeiner Road frokm Crane Road extended to the existing water main, and in M-37 from Finkbeiner Road to Town 771,078 Center Drive.

O R

P P A

Village of Middleville

Finkbeiner Road and M-37 Water Main Improvements

Village of Morrice

Expected Completion Date

796 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Construction of 24" storm sewer along West Street connecting to the existing storm sewer on M-90 and outletting near the County Drain. Project will result in the diversion of storm water flow from the under-capacity storm sewer system on M-90 (controlled by MDOT) and relieve current system back-ups and road flooding which occur in various areas of the village during high intensity rain events. Project was originally discussed in 2000 with the full support of the local MDOT staff, however MDOT and village funding levels have not allowed for construction to be completed to date.

Funding Request

D VE

Route (Infrastructure Only)

$

West Street: M-90 150,000 to Dead End

11/1/2009

$

750,000

6/1/2009

$

25,000 Local Street

5/1/2009

6/1/2009

$

25,000 Local Street

5/1/2009

6/1/2009

$

50,000

10/1/2009

$

100,000

10/1/2009

$

150,000

Village of North Branch, Village of North Branch North Branch Township

West Street Storm Sewer

Village of Ontonagon

Ontonagon, MI

To fix and extend the River Walk that was destroyed by the wave action after the ACE actions along the Ontonagon River piers. And to extend the River Walk to Meet the Ontonagon River Walk Repairs and extention Downtown. 5/1/2009

Village of Ontonagon

Ontonagon, MI

Mulock Street Paving

To finish paving Mulock Street to the Dead End

Village of Ontonagon

Ontonagon, MI

Pine Street Paving

To pave Pine Street, one of the only streets in the Village yet to be paved.

Village of Ontonagon

Ontonagon, MI

Ontonagon Water Tower Repairs

To clean, fix insulation, and repaint the water tower in Ontonagon.

PP

5/1/2009

A T

O R

Village of Ontonagon

Ontonagon, MI

Village Sidewalk Improvements

Village of Ontonagon

Ontonagon, MI

Village Fire Hall Repairs

To fix the sidewalks within the Village of Ontonagon that are in a state of disrepair. To allow a non motorized walkway, using an exsisting sidewalk, from Downtown to the Lake Shore. 5/1/2009 To replace the old boiler system, rework the electrical system, and to insure the building is structurally sound. 5/1/2009

Village of Ontonagon

White Pine, MI

White Pine Water Tower Replacement

To replace the very old and almost obsolete water tower in White Pine.

5/1/2009

8/1/2009

$

250,000

Water Plant Garage

To erect a three stall garage to allow the Village Water and Public Works Departments to keep equipment needed for repairs in White Pine and out of the elements.

5/1/2009

8/1/2009

$

75,000

August, 2009

$

110,000 Wilson Road

November, 2009

$

Beecher Street; Jefferson Ave; Pine Street; Main Street; 420,000 and Orchard Street

10/9/2009

$

260,405 ?

8/30/2009

$

Village of Ontonagon

White Pine, MI

s

t s e

O N

u q e

Village of Otisville

it

Village of Otisville

m b u

R d

e t t

Village of Otisville, Forest Township Back-Up Well Construction

Village of Otisville, Forest Township Storm Sewer System Improvements

S Village of Otter Lake

Village Of Otter Lake

Village of Ovid

Ovid

02262009

Construct a back-up Type I municipal well to replace an aged well with known levels o arsenic exceeding EPA standards. The new well will be constructed near the existing water treatment plant and will be connected to the treatment plant. The construction of the well will increase the village's firm capacity and is a project identified by the MDEQ as needed during their annual system review. When the treatment plant was constructed in 2004, provisions were made with the piping and building to facilitate the connection of this back-up well. Hydrogeologic studies of the acquifer have already been completed and the village has obtained engineering costs to design the system and is poised to begin design. June, 2009

Village Improvement and recouping Improve access to Michigan Milk Producers Assoc.

Placement of new 12"-24" storm sewer in various areas of the village to replace aged and failing existing systems. In some areas, no storm sewer is currently present. Flooding and soil erosion issues are occuring due to the lack of adequate storm sewer facilities. The storm sewer will outlet to existing enclosed sections of the Extension of the Coe Drain which is the natural drainage pattern for this area. August, 2009 To upgrade and improve road conditions in Village. To relieve the indebtedness from road equipment. To recover loss fromm underestimated cost by engineers for our sewer project. To accomplish these things would make for a safer community. We would have to struggle less because of the losses and it could prevent raising taxes which would cause a further burden on our tax payers. It would also add appeal to potential home buyers. 3/9/2009 Replace large colvert under Williams St. and change right angle turn radius to accommodate the larger trucks delivering to MMPA and improve safety. 6/1/2009

Submitted Requests - Not Approved

90,000 Williams St.

797 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Village of Ovid

Ovid

Improve West Front St.

Village of Ovid

Ovid

Replace inadequate water lines

Village of Ovid Village of Paw Paw Village of Pellston Village of Pellston Village of Pellston

Ovid Paw Paw Pelllston Pellston see above

New Water Tower Water water sewer

Project Description

Start Date

This will allow a 2nd access to MMPA and also accommodate Ovid residents. DEQ has requested that 3,000 ft. of water lines be replaced/over 100 yrs. Old and no longer adequate. Larger water tower is needed for supply current and growing demand for industry needs and safety Water provide water and sewer to the residents of the village Pellston Regional Airport rescue facility see above

Pellston water

7/1/2009

10/30/2009

10/1/2009

6/1/2010

10/1/2009

1/1/2010

immediate

P P A

the project would provide sewer service to the commercial and residential properties within the Village of Pellston, as well as to the Pellston Regional Airport. TBD construct public restrooms in the Downtown Park immediate repaving of 1 mile of Mill Street paving of approx. 1 mile of Townline St Renovate a 5 block area of the business district 6/15/2009

Village of Pentwater

Sanitary Sewer Replacement

Sanitary sewer replacement, required by a MDEQ Administrative Consent Order, for deteriorated existing sewers on Hancock St. & Dover St., including required pump station upgrades 6/15/2009

Village of Quincy

Quincy

Replacement of the current 4" water main to 12" and reconstruction of the roadway in the area that surrounds the Quincy School campus. This would provide adequte fire Fulton/ E. Liberty Water Main Reconstruction flows for the schools. 6/15/2010

Village of Quincy

Quincy

Village of Quincy

Quincy

Village of Pentwater

T O

700,000

11/1/2009

$

180,000

5/1/2010

$

355,000

9/1/2010

$

325,000

11/1/2009

$

400,000 North Main Street

12/1/2010

$

2,886,000

10/31/2010

$

410,000

11/15/2009

$

500,000

4/15/2009

11/15/2009

$

500,000 US-12

5/1/2009

6/1/2009

$

250,000 4th Street

8/15/2009

11/15/2010

$

t s e

Quincy

Village of Quincy

Quincy

Quincy Wastewater Lagoon Expansion

Our completed sewer capacity study indicated a need to add an additional lagoon to our current system. This would add a large storage lagoon and necessary structures. 4/1/2010

Cement Plant Redevelopment West Jefferson Street Water and Road Reconstruction

The Village has the opportunity to acquire lakeside property that used to house a cement plant. An EPA grant is currently being used to test the property. An initial estimate of $400,000 to level the strucutres and clear the channel that serves the site. 4/1/2010 Replacement of 4" water main with 12", complete reconstruction of the road surface, addition of curb and gutter 7/1/2009

US-12 Reconstruction

Expansion of the water main replacement for a planned 2009 project. This project would finish the replacement of water main on US-12 and would alleviate a flow problem to two industrial customers.

4th Street Improvements Production Well, Well House Bldg. & Water Main

Repair of deteriorating roadway, drainage improvements Installing a production well and well house building at the Schoolcraft Township Hall and extending water main to alternative well site.

Quincy

Village of Quincy

u S

Quincy

Village of Roscommon Village of Roscommon Village of Schoolcraft

Schoolcraft Village

02262009

u q e

R d

Submitted Requests - Not Approved

US 31 Village limit to Village limit as well as the interior 6,000,000 roads 75,000 200,000 250,000 800,000

$

Village of Quincy

Village of Quincy

680,000 Ovid 1,500,000 Yes 12,000,000 11,500,000 6,000,000 see above

9/1/2010

N s

A Federal aid route that has State and Federal money allocated for the reconstruction of the road (incl. adding storm sewer, curb and gutter), water main, and some sewer North Main St Reconstruction and Water Main work. Project is scheduled for 2010, but design work will be done in the next 60-90 days. Could be bumped to a 2009 start. 4/1/2009 Replacement

Quincy

$ $ $ $ $

Various streets 300,000 throughout village

See Project 950,000 description

East Jefferson Street Water Main Repalcement

Village of Quincy

D VE $

$

Quincy

bm

150,000 West Front St.

10/30/2009

Upgrade the current 4" water main to 12" and connect in to proposed US-12 project. Project would need to be scheduled around the school calendar, as it is adjacent to the school campus. 6/15/2010

it

$

10/15/2009

Replacement of two sanitary sewer lift stations. The current stations are oboslete and have far exceeded their life expectancy (also identified in our recent capacity study). 8/15/2009 Expand the current Village Hall to provide office space for the township and provide for energy efficiency improvements to the new structure. 7/1/2009

e t t

Funding Request

Route (Infrastructure Only)

$ $ $ $ $

Sewer Lift Station Replacement Village-Township Hall Consolidation and Improvements

Village of Quincy

O R

TBD

Village of Pellston; Emmet County Pellston sewer Pellston public restrooms Pellston street repaving Pellston street paving Pellston streetscape

Village of Pellston Village of Pellston Village of Pellston Village of Pellston Village of Pellston

Expected Completion Date

1,320,000

798 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Village of Schoolcraft

Schoolcraft Village

Sidewalk Replacement (Village wide)

Village wide conductivity

5/15/2009

11/15/2009

$

324,000

Village of Schoolcraft

Schoolcraft Village

Lyon Street

Center turn lane addition to Lyon Street east of Grand Street

5/15/2009

11/15/2009

$

340,000

Village of Schoolcraft

Schoolcraft Village

Grand Street Street Scape - Phase 2

South end of Village - Streetscape improvements

5/15/2009

11/15/2009

$

710,000

Village of Schoolcraft

Schoolcraft Village

Grand Street Street Scape - Phase 3

North end of Village - Streetscape improvements

5/15/2009

11/15/2010

$

3,080,000

Village of Schoolcraft

Schoolcraft Village

B&L Dr. Water Main

$

24,000

Village of Schoolcraft

Schoolcraft Village

Willow Ct. Water Main

B&L Drive - Construct 290 L.F. of 8” water main to close the dead-end to Clay Street. 6/15/2009 Willow Court - Construct 365 L.F. of 8” water main to close the dead-end to Birch Drive. 6/15/2009

11/15/2009

$

31,200

Village of Schoolcraft

Schoolcraft Village

5 additional hydrants placements

Add additional fire hydrants at 5 location ($2,500 /ea)

11/15/2009

$

15,000

Village of Schoolcraft

Schoolcraft Village

Ashery Dr. Water Main

Ashery Drive – Replace 920 L.F. of 4” water main with 920 L.F. of 8” water main.

5/15/2009

11/15/2009

$

90,000

Village of Schoolcraft

Schoolcraft Village

Redundant Water Main from Well House

Redundant Water Main from Well House

5/15/2009

11/15/2009

$

90,000

Village of Schoolcraft

Schoolcraft Village

Eliza Street Safety Improvements

Upgrade roadway for safety, wide roadway and add guardrail.

5/15/2009

11/15/2009

$

220,000

Third Street Reconstruction

To improve the quality of life, safety for pedestrians, vehicles and truck traffic. Improve the Infrastructure of the area. These streets are used by local businesses for truck routes for the first two blocks. The next four blocks are used to access the Village Parks. Make the parks more ADA user friendly with curb cuts, sidewalk ramps and sidewalks. Provide green belts between the wallking pathways and road ways. To improve Infrastructure and drainage of the area, as they present system is over 80 years old and failing.

$

Third St, from Main to Frederick, Frederick St from 550,000 Third to Fourth.

Walk Trail

Construction of a pedestrian walk/Bike path. Currently have 1.5 mile path that we would like to tie into other trails. This is used to keep pedestrians out of roadways.And safer areas to walk to school.

8/9/2009

No

Reconstruction of Wright Ave. with new curb, drainage and new road bed and surface We currently have $400,000 toward this with local task force funds but are unable to comply with the match and engineering cost to make this a reality.

8/1/2009

No

Reconstruct of an old building used to house emergency Equipment. New build would be green and would also work as a fall out shelter in a disaster situation. Currently have purchased a generator for this facility. Need funds for structure. Pending

8/9/2009

No

This would replace 28 Blocks of old inadequate 4 inch water mains that the Village has. They are undersized and inadequate for fire Protection. This would also bring a big improvement to the water quality our people drink. Pending

8/9/2009

No

Village of Sebewaing

Village of Shepherd

Village of Shepherd

Village of Shepherd

Village of Shepherd

Village of Sebewaing

Shepherd/Coe

Shepherd/Coe

Wright Ave

Shepherd/Coe

tt i m

Public Works Building

Shepherd/Coe

s

d e t

e R

Village of Spring Lake Village of Spring Lake

Grand River Greenway Bike Path_ Phase I and II

Village of Spring Lake Village of Spring Lake

Village of Spring Lake Village of Spring Lake

S

Village of Spring Lake Village of Spring Lake

02262009

5/15/2009

A T

O N

qu

Watermain Replacement

ub

t s e

PP

O R 11/15/2009

D VE

Tri-Cities Connector Path to Leonard Road Bike 1,700,000 Path

7/9/2009

11/9/2009

$

Jackson Street Dock Reconstruction

7,200 linear feet of alternative transportation path Jackson Street has an historic dock on Spring Lake that is failing and needs reconstruction

6/9/2009

8/9/2009

$

River Street Sidewalk

400 feet of sidewalk

5/9/2009

5/9/2009

$

Holmes School to 12,000 River Street

$

River, South and other streets near 300,000 schools

Multiple Sidewalks

5,000 feet of sidewalk

Submitted Requests - Not Approved

8/9/2009

11/9/2009

200,000

799 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Village of Spring Lake Village of Spring Lake

Exchange Street Streetscape

Village of Spring Lake Village of Spring Lake

Cutler Street Reconstruction

Project Description Start Date 600 feet of streetscape, new parking, safety improvements at intersections and ADA ramps, underground utilities 4/10/2009 600 feet of reconstructed Major Street, safety improvements at intersections and ADA ramps, underground utilities 4/10/2009

Village of Spring Lake Village of Spring Lake

School Street Extension

New Street to complete the Downtown Spring Lake Grid and improve safety and circulation

5/1/2009

Village of Spring Lake Village of Spring Lake

Lakeside Trail Gap Completion

Completion of 12 mile loop around Spring Lake

5/9/2009

Village of Spring Lake Village of Spring Lake

Project Name

Tanglefoot Park Docks

10 floating docks plus several transient docks

Downtown Parking Lots

Three public parking lots

Village of Spring Lake Village of Spring Lake

Meridian Water line

Undersized 4 inch line needs upgrade for fire flow

Village of Spring Lake Village of Spring Lake

Meridian Sewer Line

Village of Stockbridge Village of Stockbridge

Village of Stockbridge Village of Stockbridge

Village of Stockbridge Village of Stockbridge

Village of Stockbridge Village of Stockbridge

Village of Stockbridge Village of Stockbridge

June, 2009

$

From Mill Point Station to Liberty 400,000 Street

$

From Cutler to 917 450,000 West Savadge

$

From S. Park to S. Division on the 100,000 Grand River Barber School, Post Office Lot and 60,000 Clock Tower Lot

$

4/9/2009

5/9/2009

$

110,000 Meridian Street

5/9/2009

$

Industrial Park Phase II

100 year old sewer line has major infiltration/leakage issues 4/9/2009 Complete utility and street construction for existing 22 acre, second phase industrial park

80,000 Meridian Street Green Road & Bird 750,000 Drive

Emergency services facility

Newly organized Stockbridge Area Emergency Services Authority incorporated a fire department and amubulance service. Both work from separate, ageing facilities. A new combined facility will help achieve economies and allow better access to the community. Summer 2010

Clinton Street pedestrian pathway

e t tt

i m

-N

e u

eq

Demolish three delapitated buildings in the downtown. Create two municipal parking lots and two municpal green spaces Summer 2009

Spring 2011

Winter 2009

The Elizabeth St. bridge carries local automobile and pedestrian traffic over the Lowe lake drain. The exisitng bridge is a pre-WWII sand bag and cement culvert and is experiencing significant deteriration and needs to be rebuilt.

New water well

Village of Stockbridge Village of Stockbridge

New Village DPW facility

Single DPW facility is small, outdated and at the end of it's useful life.

Local street reconstruction

$

Pedestrian walkway and bridge connecting a grocery store and several businesses to multifamily low/fixed income housing facilities, and single family homes.

R d

Downtown Redevelpment

Elizabeth Street Bridge

s t s

T O

Village of Stockbridge Village of Stockbridge

02262009

O R 8/9/2009

D VE

6/9/2009

ub

S

9/9/2009

Route (Infrastructure Funding Request Only) Buchanan to $ 300,000 Division Exchange Street to $ 200,000 Liberty Street

May, 2009

Old, deterioriating streets require reconstruction and in some cases need water main reconstruction underneath The village has two aging water wells prudence dictates new well, pump, well house & controls Summer 2009

Village of Stockbridge Village of Stockbridge

9/9/2009

P P A May, 2009

Village of Spring Lake Village of Spring Lake

Expected Completion Date

Submitted Requests - Not Approved

Summer 2009

$

3,750,000

$

East side of M-52 from Center Street south the intersection of M377,000 52 & M106

$

Herbert St, Elizabeth St, 450,000 Clinton St.

$

Elizabeth Street bridge over Lowe 575,000 Lake Drain

$

North Main Street, Elizabeth Street, Center Street, 850,000 Water Street

Summer 2009

$

220,000

Fall/Winter 2009

$

275,000

800 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Thompsonville

Thompsonville, MI

Project Name

Project Description

Start Date

Taxiway Construction

Additional parallel taxiway is needed to facilitate growth at this airport and provide space for corporate hangars to serve aircraft demand for nearby resorts. Airport provides a valuable transportation link and is a vital part of the community; however it is ineligible for federal funds. Taxiway will improve safety for the airport by eliminating the need to back taxi on the runway. The existing snow removal equipment is 20 years old and has exceeded its useful life. A new piece of equipment is needed to ensure that snow can be removed from the runway to allow for safe operations. A simple, small storage building will also be constructed to house the new piece of snow removal equipment. This building will maximize the investment made in the airport by protecting the new piece of equipment from the elements. These infrastructure improvements will also benefit the nearby Crystal Mountain Resort by providing a more reliable transportation network to the resort. Project will create temporary construction jobs and preserve jobs that are currently tied to the airport. The snow removal equipment will allow the airport to more reliably clear the snow and enable ye 5/1/2009

Water System Upgrade

The Village of Three Oaks has an antiquated water distribution system which was buil in the early 1900’s. The pipe material is a very brittle cast iron which has lead packed joints connecting the various lengths of pipe. When the Village opens or shuts a valve or even if they flush their hydrants, the pressure change can cause breaks in the old piping system. The public works department has been called out on numerous emergency repair projects due to those breaks and this repair work consumes a fair amount of the water department budget. Much of the piping is also undersized and creating inadequate fire flows for some areas of the community. There have been a couple of pipe replacement projects and several extensions of the system. During the course of these projects, the adjacent piping would erupt and there would be extra costs to these projects to cover these repairs. The water superintendent does not feel comfortable leaving town due to the fear that no one else would know how to handle repairs to the system. 4/1/2009

A T

Village of Three Oaks Village of Three Oaks

d e tt

b u S

t i m

Village of Three Oaks Village of Three Oaks

02262009

Elm Street Utility Upgrade

e u

st

q e R

s

Expected Completion Date

PP

O R 8/1/2009

Funding Request

Route (Infrastructure Only)

D VE $

520,000 Txy B

O N

The Village has chronic problems with the storm water collection system and the water main distribution system in their community. The native soil in the area is clay which does not serve well for absorption of the storm water. The main artery through the community is Elm Street. Anyone entering the Village from either the north or the south has to travel along this road. The downtown business district is located along this stretch of road. The community, recently, was able to leverage some funds from the State of Michigan to upgrade a small section of the infrastructure and install some streetscape enhancements. However, the infrastructure to the north and south of the downtown area is in a terrible condition and it is the number one priority on the Village’s capital improvement list. The Village would like to start work on this project as soon as possible, but there are financial hardships with the budget and the likelihood of this work being performed soon is highly unlikely. 4/1/2009

Submitted Requests - Not Approved

12/1/2009

12/1/2009

$

Numerous locations throughout the 2,575,000 Village

$

Elm Street from Pine Street to Sycamore Street and from US-12 to a point 500 feet south of Indiana 2,700,000 Street

801 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Village of Vernon Village of Vicksburg Village of Vicksburg Village of Vicksburg

Start Date

Several years ago the Village of Three Oaks replaced a rather antiquated lighting system in the downtown area. The residential areas of the Village still have the old lighting system. The Village is a very small community and funds were limited. The lighting system for the downtown area encompases 24 lights and the residential area has several hundred. The lights in the village are in need of replacement with energy efficient, green lighting. The lights should be run on a global clock with the ability to dim the lights and adjust them as needed. Replacing the lighting could reduce energy consumption by as much as 50%, maintenance by 99% and save the Village nearly $10,000 per year. The Village is financially strapped and this project has been on the Village's list without the resources to begin the project. There is a company in Farmington Hills, MI that can begin the project immediately. See attached lighting piece. 2/9/2009 Construction of a new wastewater sewer lagoon, relining the existing lagoons, and replacement of the main village pump station. July, 2009

Village of Three Oaks Village of Three Oaks Three Oaks Lighting Village of Vernon, Vernon Village of Vernon Township WWSL Improvements

Village of Vernon, Vernon Township Vicksburg Vicksburg Vicksburg

Project Description

Main Street Improvements Washington St Force Main Storm Sewer Mapping, Cleaning & Video V Ave. Force Main

T O

Drainage improvements and storm sewer reconstruction, including necessary pavement and curb repairs. Washington Street Force Main Storm Water Mapping, Evaluating System along with Cleaning and Video V Avenue Force Main

N s

5/15/2009 5/15/2009 5/15/2009

Village of Vicksburg

Vicksburg

Village Wide Water Main

Village of Vicksburg

Vicksburg

Lee Ave. & E. Highway St. Water Main

Village of Vicksburg

Vicksburg

N. Richardson Ave. Water Main

Village of Vicksburg

Vicksburg

South Mills Water Main

Village of Vicksburg

Vicksburg

E. Prairie St. Water Main

Village of Vicksburg

Vicksburg

East of N. Boulevard St. Water Main

Village of Vicksburg

Vicksburg

22nd Street Water Main

Place a 12-inch water main in 22nd Street from the 12-inch water main at Lotus Lilly Avenue to the 12-inch water main located north of Parkhurst Lane.

Village of Vicksburg

Vicksburg

Village of Vicksburg

Vicksburg

Village of Vicksburg

Vicksburg

tt i m

d e t

S

ub

Vicker St. & "V" Ave. Water main W. Vine, N. Michigan Ave. & Bowie Water Main

N. Boulevard St. Water Main

Village of Vicksburg

Vicksburg

Maple Meadows Ave. Water Main

Village of Vicksburg

Vicksburg

N. Main St. Water Main

02262009

t s e

qu

5/15/2009

Replace the existing 8-inch main in Vicker Street with a 12-inch water main and place a 12-inch water main on the north side of “V” Avenue from Vicker Street to Trillum Boulevard. 5/15/2009 Replace the existing 4-inch main in West Vine, North Michigan Avenue and Bowie with 8-inch water main. 5/15/2009 Replace the existing 6-inch main on N. Boulevard Street from McKain to West Prairie Street with a 12-inch water main. 5/15/2009 Replace the 8-inch water main in Maple Meadows Avenue, west of Vicker Street with a 12” water main and extend this 12-inch water main northwesterly and connect to the 12” water main in “V” Avenue. 5/15/2009 Replace the existing 6-inch main on N. Main Street from Prairie to North Street with 12 inch main. 5/15/2009

Submitted Requests - Not Approved

O R

P P A

East Rose (RR Tracks to Wilson); East Vine (Spruce to Wilson); East Division (Richardson to Wilson); North Pearl (Division to RR Tracks); North Spruce (Division to Rose); Wilson (Prairie to Rose); Lee (Highway St south to end); Park (Raymond south to end); West Raymond (Park west to end); South Kalamazoo (Washington to Raymond); South Richardson (Raymond to Grove); West Park (Michigan to drain); West South (Kalamazoo to drain); East Highway (Pearl to Best); Raymond (Kalamazoo to Richardson) 6/15/2009 Connect the 12-inch water main to the 8-inch water main at the intersection of Lee Avenue and East Highway Street with a 12-inch water main. 5/15/2009 Replace the existing 6-inch main on North Richardson Avenue from East Vine Street to the Railroad Tracks with an 8-inch water main. 5/15/2009 Replace the existing 4-inch main on South Mills, north of West Prairie with an 8-inch main. 5/15/2009 Replace the existing 8-inch main on East Prairie Street from North Main Street to North Kalamazoo Street with a 12-inch water main. 5/15/2009 Replace the existing 8-inch main east of N. Boulevard Street from Briggs Street to West Washington Street with a 12-inch water main. 5/15/2009

e R

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

10/9/2009

$

250,000

September, 2010

$

2,000,000

11/15/2009 11/15/2009 11/15/2009

$ $ $ $

Between M71 and the railroad tracks 1,000,000 (village limits). 150,000 200,000 330,000

6/15/2010

$

2,141,100

11/15/2009

$

9,360

11/15/2009

$

28,080

11/15/2009

$

33,696

11/15/2009

$

78,624

11/15/2009

$

131,040

11/15/2009

$

148,512

11/15/2009

$

152,880

11/15/2009

$

164,268

11/15/2009

$

247,104

11/15/2009

$

258,336

11/15/2009

$

263,952

802 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Wolverine Lake

Village of Wolverine Lake

Voyageur Academy

Project Name

Project Description

Start Date

Village of Wolverine Lake, (Commerce Twp) Oakland County, MI S. Commerce Rd. Sanitary Sewer

Installation of 4000 LF of 10 inch and 3200 LF 8 inch HDPE Forced Main Sanitary Sewer and associated pump station. Project will serve 500 homes to remove impact of septic fields on the lake. Sewer will run from Wolverine Dr. to Glengary Rd along South Commerce Rd. 5/1/2009

Village of Wolverine Lake, (Commerce Twp) Oakland County, MI S. Commerce Rd. Sanitary Sewer

Installation of 4000 LF of 10 inch and 3200 LF 8 inch HDPE Forced Main Sanitary Sewer and associated pump station. Project will serve 500 homes to remove impact of septic fields on the lake. Sewer will run from Wolverine Dr. to Glengary Rd along South Commerce Rd. 5/1/2009

Detroit

Construction project for school expansion

This facility will provide a new state of the art facility that will have technology and space to deliver a quality education to students throughout the Metro Detroit are and beyond. 10/1/2009

Wakefield Memorial Building

This project is being developed by a non-profit entity that plans to donate the completed facility to the City of Wakefield. The proposal is to demolish the existing, dilapidated, former Veteran’s Memorial Building to build a new 34,000 sq. ft. state-ofthe-art community center that is equally inspirational as the original. This unique piece of architecture will celebrate the heritage of the Wakefield community while looking to the future in its use of technology for aesthetics and environmental sustainability. Plans include reclaimed elements from the existing structure, integrated into the various functions; Theater, Great Hall Gallery, Library, City Hall & Council Chamber, and Physical Fitness Facility. Several spaces will be designed with de-mountable or movable walls to be multi-purpose for a variety of public and private functions large and small, such as a voting center, lectures, local weddings & other town gatherings. The Great Hall Gallery will be used for artwork and regional and local interpretive displays. Special emphasis is being focused on using environmentally sustainable ma4/30/2009

Wakefield Memorial Building Foundation client of Myefski Cook Architects Wakefield/Wakefield

Expected Completion Date

T O

9/1/2009

9/1/2009

O R 8/1/2010

Funding Request

$

D VE $

Route (Infrastructure Only)

Between Glengary Rd and Wolverine 975,000 Dr. Between Glengary Rd and Wolverine Dr.

13,000,000

P P A

N s

t s e

7/1/2010

$

6,871,684 N/A

Walden Green Montessori is a public school academy authorized by Central Michigan University in 1995. Our school offers a Montessori education to children kindergarten through eighth grade. Our instructional methods emphasis experiential learning and critical thinking skills. Our project includes the construction of a middle school environment, a preschool environment and a gymnasium. A middle school addition will allow our adolescent program to double in population. A preschool addition would enable the creation of a high quality early childhood program to serve the needs of ou local community. A gymnasium would greatly improve our efforts with physical education, after school programs and community events. The project also includes “greening” our current facility and all new construction with wind power, solar power and geothermal power. These measures would produce enough energy to supply hal of the school’s energy needs. These measures would also bring all our facilities into LEAD certification. Our project began in 2008 and has been stalled due to lack of funding. The preliminary planning and schematic design are completed. Upon approv6/1/2009

5/1/2010

$

4,500,000

The purpose of this project is to improve the structural integrity and energy efficiency of a nationally designated historic structure designed by Louis Kahn, originally the Liggett School for Girls, now the Detroit Waldorf School located at 2555 Burns Avenue in Detroit. The project calls for improved energy efficiency from the installation of insulation, new windows, replacement lighting fixtures and an energy efficient kitchen; improved structural integrity, including roof restoration, gutter repair and replacement, stucco replacement, rebuilt retaining walls, and upgrades to electrical, plumbing and heating systems; and meeting ADA standards by modifying entrances, bathrooms and access to multiple levels in the building. Immediate

365 days for entire project, but most phases would be completed very quickly $

1,055,000

6/1/2010

Adjacent to existing 30 Mile Road Fire 3,000,000 Station

u q e

Walden Green Montessori

Waldorf School Association of Michigan

R d

Spring Lake Township

i m

b u S Detroit

Washington Township Washington Township

02262009

e t tt

Walden Green Montessori

WSAM Sustainability Project

Water Tower

To construct a 2.0 Million Gallon water storage tower with a $3,000,000 project cost

Submitted Requests - Not Approved

6/1/2009

$

803 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Washington Township is currently served by an existing sanitary sewer network that connects into a sole outlet at the southeast corner of the Township (at the northwest corner of 26 Mile Road and Hayes Road). This sewer, a combination force main and gravity sewer, was completed in the late 1970s and at the time was constructed improperly by the original contractor. Since that time, the existing sewer has deteriorated to the point of eminent failure and environmental contamination. Spot repairs have been made to the sewer since its construction, but as the pipe continues to deteriorate, these repairs will become more frequent, substantial and costly. Numerous sewer televising and engineering firms have been contracted in the past to review the condition of this pipe, and all agree that it has become an emergency situation that must be addresses immediately. In addition, the existing sewer capacity will not be sufficient to handle the Township’s ultimate needs at full build-out. The Township has entered into a contract with Giffels-Webster Engineers to prepare a topographic and geotechnical survey of the project site. The design plan will rebuild th 5/15/2009

Sewer route follows Hayes Road which is the eastern border of Shelby Township and the western border of Macomb Washington Township Township Hayes Road Sewer

Washington Township Washington Township

A T

Removal and replacement of 2,005 linear feet of existing 12" water main with a $300,000 project cost

26 Mile Road Water Main

$

O N

6/1/2010

$

3,000,000

Removal and replacement of 2,005 linear feet of existing 12" water main with a $300,000 project cost. North side of 26 Mile Road between M-53 and Van Dyke.

6/1/2010

$

300,000

Allen Creek Dexter Ave. Improvements Maple to Fairview.

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 3.5 upstream acres by including stormwater BMP's (bio infiltration, oversized pipe, swirl concentrator, porous concrete) as part of Dexter Ave. reconstruction. The project is 180 days from contained in the Allen's Creek SRF Project Plan. Award

1 year after start date

$

332,000

Allen Creek Dexter Ave. Improvements Fairview to Huron Sts.

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 10.3 upstream acres by including stormwater BMP's (bio infiltration, oversized pipe, swirl concentrator, porous concrete) as part of Dexter Ave. reconstruction. The project is 180 days from contained in the Allen's Creek SRF Project Plan. Award

1 year after start date

$

437,300

26 Mile Road Water Main

Hayes Road Sewer

e t tt

i m

ub

u q e

R d

S 02262009

6/1/2010

North side of 26 Mile Road between M-53 and Van 300,000 Dyke

5/1/2010

10,000,000

Washington Township, Washington Township Macomb County

Ann Arbor, MI

$

East side of Hayes Road from 26 to 23 10,000,000 Mile Road

$

Water Tower

Washtenaw County

6/1/2009

Route (Infrastructure Only)

D VE

5/1/2010

t s e

Washington Township, Washington Township Macomb County Washington Township, Washington Township Macomb County

Ann Arbor, MI

PP

O R

Funding Request

Washington Township is currently served by an existing sanitary sewer network that connects into a sole outlet at the southeast corner of the Township (at the northwest corner of 26 Mile Road and Hayes Road). This sewer, a combination force main and gravity sewer, was completed in the late 1970s and at the time was constructed improperly by the original contractor. Since that time, the existing sewer has deteriorated to the point of eminent failure and environmental contamination. Spot repairs have been made to the sewer since its construction, but as the pipe continues to deteriorate, these repairs will become more frequent, substantial and costly. Numerous sewer televising and engineering firms have been contracted in the past to review the condition of this pipe, and all agree that it has become an emergency situation that must be addresses immediately. In addition, the existing sewer capacity will not be sufficient to handle the Township’s ultimate needs at full build-out. The Township has entered into a contract with Giffels-Webster Engineers to prepare a topographic and geotechnical survey of the project site. East side of Hayes Road from5/15/2009 To construct a 2.0 Million Gallon water storage tower with a $3,000,000 project cost. Adjacent to existing 30 Mile Road Fire Station. 6/1/2009

s

Washtenaw County

Start Date

Expected Completion Date

Submitted Requests - Not Approved

6/1/2009

804 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Washtenaw County

Washtenaw County

Start Date

Ann Arbor, MI

Ann Arbor, MI

Allen Creek Stadium Blvd. Improvements Main St to White St.

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 6.45 upstream acres by including stormwater BMP's (bio infiltration, oversized pipe, swirl concentrator, porous concrete) as part of Stadium Blvd. reconstruction. The project is 180 days from contained in the Allen's Creek SRF Project Plan. Award

Allen Creek Miller Ave. Improvements Hatcher Crescent to Newport Rd.

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 19.5 upstream acres by including stormwater BMP's (bio infiltration, porous concrete) as part of Stadium Blvd. reconstruction. The project is contained in the Allen's Creek 180 days from SRF Project Plan. Award

Funding Request

D VE

1 year after start date

440,400

1 year after start date

$

523,200

1 year after start date

$

587,800

Sharon and Manchester Drain Extension

Storm water infrastructure that services residential, commercial and rural areas. Built Construction start in 1917 the system is failing causing road failures, damage to personal property and 180 days from 6 months after localized flooding. approval of funds start date

$

330,000

York Township, MI

Territorial Road Drain

Replace an enclosed drain that runs along roadside. Drain is in disrepair with blowholes forming. Structures have suffered damage from farm and road vehicles.

Construction start 180 days from 4 months after approval of funds start date

$

280,000

Ypsilanti Township, MI

Washtenaw Clubview #1 and Washtenaw Clubview #2

Replace and repair enclosed drains that once served as a combined sewer system. Construction start The services have been separated; pipe lines still have illicit connections, failures, roo 180 days from 6 months after blockages, and significant structural issues with manholes and catch basins. approval of funds start date

$

1,435,000

$

Malletts Creek and the downstream Huron River are not meeting water quality standards due to urban stormwater pollution. The project would capture stormwater in existing conveyance structures, reduce peak flow, improve downstream habitat 1,500,000 and protect downs

Washtenaw County

Sharon & Manchester Townships, MI

d e tt

A T

e u

st

q e R

s

PP

O R

O N

it

m b u

S Washtenaw County

Route (Infrastructure Only)

$

Ann Arbor, MI

Washtenaw County

Project Description

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 6.37 upstream acres by including stormwater BMP's (bio infiltration, porous concrete) as Allen Creek Stadium Blvd. Improvements - 7th part of Stadium Blvd. reconstruction. The project is contained in the Allen's Creek 180 days from Ave to Main St. SRF Project Plan. Award

Washtenaw County

Washtenaw County

Project Name

Expected Completion Date

Construction start 120 days from approval of funds

02262009

Malletts Creek Inline Detention

City of Ann Arbor, MI

Submitted Requests - Not Approved

6 months after start date

805 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

Washtenaw County

Construction start 120 days from approval of funds

West Park Fairgrounds Drain

T O

City of Ann Arbor, MI

s t s

P P A

Washtenaw County

Construction start 180 days from approval of funds

Sharon and Manchester Drain Extension

Sharon & Manchester Townships, MI

Washtenaw County

Construction start 180 days from approval of funds

Territorial Road Drain

Replace an enclosed drain that runs along roadside. Drain is in disrepair with blowholes forming. Structures have suffered damage from farm and road vehicles.

R d

e t tt

D VE $

Repair and replace 4500 feet of storm sewer from current 36” - 72” diameter pipe, which is rusted and failing and installation of stormwater BMPs. Several sink holes have developed. Properties threatened by imminent collapse include main roads 6,750,000 (Maple an

$

Storm water infrastructure that services residential, commercial and rural areas. Built in 1917 the system is failing causing road failures, damage to personal property and localized 330,000 flooding.

$

280,000

-N

e u

eq

Funding Request

6 months after start date

i m

b u S Washtenaw County

Construction start 180 days from approval of funds

02262009

Washtenaw Clubview #1 and Washtenaw Clubview #2

Ypsilanti Township, MI

Submitted Requests - Not Approved

6 months after start date

Route (Infrastructure Only)

$

Replace and repair enclosed drains that once served as a combined sewer system. The services have been separated; pipe lines still have illicit connections, failures, root blockages, and significant structural issues with manholes and 1,435,000 catch basins.

806 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Washtenaw County

Project Name

Construction start 45 days from approval of funds Bridgewater Village Tile

Project Description

Start Date

Expected Completion Date

Provide stormwater management and flood relief in an economically challenged area of Bridgewater Township. The project also provides flood control for a major transportation route

Washtenaw County

Construction start 60 days from approval of funds Lincoln Drive Drain

Northfield Township, MI

s t s

-N

D VE

P P A 120 days after start date

Yes

$

e u

Washtenaw County

d e tt

q e R

it

construction start 90 days Willow Run Hydro-Electric Dam Removal and from approval of funds Environmental Remediation Ypsilanti Township, MI

m b u

Bridgewater 885,000 Township

$

O R

T O

Funding Request

6 months after start date

Yes

$

Route (Infrastructure Only)

Replace storm water infrastructure in a residential area which has exceeded its expected service life and is failing. The system is undersized to handle the drainage area serviced. Flooding and road failures occur on a periodic basis due 585,000 to pipe failure

Removal of a decommissioned hydro-electric dam and site clean-up. An estimated 21,000 cubic yards of a contaminated material (type I or type II material; not yet determined) must be removed and disposed of. Structural removal of dam and related 5,100,000 faciliti

S 02262009

Submitted Requests - Not Approved

807 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

Washtenaw County

Washtenaw County

Dec. 2009

All 720 square miles of Washtenaw County

T O

City of Ann Arbor, MI

Wireless Washtenaw – Complete the deployment of wireless technology and bring low cost Internet access to all Washtenaw County residents

The Wireless Washtenaw project is designed to facilitate the deployment of a highspeed wireless internet network throughout Washtenaw County. The network was intended bring wireless technology across all the urban, suburban, and rural residents and provide residents and visitors a seamless experience while eliminating the digital divide. 10/15/2007

s t s

5/11/2009

-N

$

5/1/2011

$

e u

Washtenaw County

d e tt

q e R

it

Allen Creek Stadium Blvd. Improvements - 7th Ave to Main St.

Ann Arbor

m b u

180 days from Award

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. The project would capture and infiltrate 310 acres of urban stormwater runoff, 4,400,000 reduce floodi

D VE

P P A

Allen Creek Pioneer High School Project

Funding Request

Route (Infrastructure Only)

1 year after start date

$

11,000,000

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 440,400 6.37 upstream a

S 02262009

Submitted Requests - Not Approved

808 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

Washtenaw County

Ann Arbor

Allen Creek Stadium Blvd. Improvements Main St to White St.

T O

P P A 180 days from Award

Funding Request

$

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 523,200 6.45 upstream a

$

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 437,300 10.3 upstream

$

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 332,000 3.5 upstream a

D VE

1 year after start date

N s

t s e

Washtenaw County

Ann Arbor

u q e

R d

Allen Creek Dexter Ave. Improvements Fairview to Huron Sts.

e t tt

180 days from Award

1 year after start date

i m

b u S Washtenaw County

Ann Arbor

02262009

Allen Creek Dexter Ave. Improvements Maple to Fairview.

180 days from Award

Submitted Requests - Not Approved

1 year after start date

Route (Infrastructure Only)

809 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

Washtenaw County

Washtenaw County

Washtenaw County

Allen Creek Miller Ave. Improvements Hatcher Crescent to Newport Rd.

Ann Arbor

Ann Arbor

Ann Arbor Township

Allen Creek Stadium Blvd. Improvements Pauline to 7th Streets

Post Family Trail and Pavilion

This project, at Parker Mill County Park, includes a new bridge over Fleming Creek to provide access to an undeveloped portion of the park that was once the mill pond and mill race that powered the historic Mill. The County is proposing a new trail network that defines the old pond location seating areas, interpretive signage (explaining history and environment), and a unique pavilion with a “green” roof. 6/1/2009

d e tt

Ann Arbor, MI

Allen Creek Stadium Blvd. Improvements Pauline to 7th Streets

Washtenaw County

Award Dependent

Washtenaw County Transit Expansion

Washtenaw County

Award Dependent

02262009

180 days from Award

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutions. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 17 upstream acres by including stormwater BMP's (bio infiltration, oversized pipe, swirl concentrators, porous concrete) as part of Stadium Blvd. reconstruction. The project is contained in the Allen's Creek SRF Project Plan. 4/9/2009

Washtenaw County

u S

T O

P P A

N s

bm

Commuter Rail Project-WALLY North-South Commuter Rail

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutions. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 17 upstream acres by including stormwater BMP's (bio infiltration, oversized pipe, swirl concentrators, porous concrete) as part of Stadium Blvd. reconstruction. The project is contained in the Allen's Creek SRF Project Plan. 4/9/2009 Expand transit to provide access between small community centers outside of the urban area and the City of Ann Arbor employment hub.

Washtenaw County and Livingston County

Submitted Requests - Not Approved

$

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. This project would improve water quality and provide quantity management for 587,800 19.5 upstream a

$

490,000

$

736,200

D VE

1 year after start date

11/15/2010

qu

e R

it

t s e

Funding Request

Route (Infrastructure Only)

11/15/2010

Award Dependent Yes

$

$

11,700,000 Various units Construct five stations and institute operations for a north-south commuter rail from Howell to Ann Arbor on existing 3,750,000 track.

810 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Washtenaw County

Washtenaw County

Award Dependent

Project Name

Project Description

East-West Commuter Rail

Chelsea

Washtenaw County

City of Ypsilanti, MI

Start Date

Washtenaw County and Wayne County

Award Dependent Yes

O R

Provide stormwater management and flood relief in an economically challenged area of Bridgewater Township. The project also provides flood control for a major transportation route

Bridgewater Township, MI Bridgewater Village Tile

Washtenaw County

Expected Completion Date

New 14A-3 District Courthouse – Modern courthouse with latest court technology and energy efficiency Department of Human Services – Install Energy Management System

The 14A-3 District Court is housed in a 1905 era ex-bank building. It is highly energy inefficient and greatly deficient in serving as a secure modern courthouse. 6/1/2009 Replace inefficient energy control system with an automated energy management system to improve reliability and reduce energy consumption. 4/1/2009

A T

PP

Funding Request

Construct five stations for an eastwest commuter rail from Detroit to Ann Arbor Michigan on 3,750,000 existing track.

D VE $

$

885,000

6/1/2010

$

4,000,000

7/31/2009

$

285,000

$

6,300,000

Washtenaw County

City of Ann Arbor & Pittsfield Township, MI

Malletts Creek Drain Repair and Restoration

Reconstruction of 26,500 linear feet of stream channel crossings and enclosed pipe that provides stormwater management and drainage to approximately 40% of the urban Ann Arbor area. Assist in meeting a "Total Maximum Daily Load" phosphorus construction start reduction mandate through substantial reduction of sediment delivery to downstream 90 days from 1 year after start waterways approval of funds date

Washtenaw County

City of Ann Arbor, MI

Community Mental Health Treatment Center Infrastructure

Infrastructure improvements to ensure a safe environment to provide public services and replace deteriorated building envelope to improve energy efficiency. 4/1/2009

$

985,000

Malletts Creek Inline Detention

Malletts Creek and the downstream Huron River are not meeting water quality standards due to urban stormwater pollution. The project would capture stormwater in existing conveyance structures, reduce peak flow, improve downstream habitat and protect downstream properties from flash flooding. With other projects, this one aims Construction start to meet water quality standards of the Clean Water Act (Phosphorus and e. Coli 120 days from 6 months after TMDLs). approval of funds start date

$

1,500,000

West Park Fairgrounds Drain

Repair and replace 4500 feet of storm sewer from current 36” - 72” diameter pipe, which is rusted and failing and installation of stormwater BMPs. Several sink holes have developed. Properties threatened by imminent collapse include main roads (Maple and Dexter), a shopping mall, parkland, and residential properties.

$

6,750,000

Washtenaw County

Washtenaw County

Washtenaw County

Washtenaw County

Washtenaw County

Washtenaw County

City of Ann Arbor, MI

City of Ann Arbor, MI

s

t s e

O N

u q e

R d

e t tt

10/1/2009

Construction start 120 days from approval of funds

Allen Creek Pioneer High School Project

Allen Creek County Drain and downstream Huron River are not meeting water quality standards due to urban pollutants. Allen Creek is susceptible to flash flooding. The project would capture and infiltrate 310 acres of urban stormwater runoff, reduce flooding, improve water quality and defer storm water utility upgrades. The project is contained in the Allen's Creek SRF Project Plan. Dec. 2009

5/1/2011

$

4,400,000

New 14A-3 District Courthouse – Modern courthouse with latest court technology and energy efficiency

The 14A-3 District Court is housed in a 1905 era ex-bank building. It is highly energy inefficient and greatly deficient in serving as a secure modern courthouse. 6/1/2009

6/1/2010

$

4,000,000

City of Ypsilanti, MI

New 14A-2 Courthouse/Renovation to modernize courthouse with court technology and energy efficiency

The 14A-2 District Court is housed in a 1960’s era ex-grocery store building. It is highly energy inefficient and greatly deficient in serving as a secure modern courthouse.

4/1/2010

$

3,200,000

City of Ypsilanti, MI

Renovation of Public Health Services Complex including new energy efficient windows, modern labs and new IT infrastructure

The County’s public health and community mental health building was scheduled for a multi-million dollar renovation to bring it up to modern codes for life safety and energy efficiency. The project budget was cut to $1,000,000 due to the County’s budget situation and a major portion of the project scope was eliminated. 5/15/2009

12/31/2009

$

3,500,000

City of Ann Arbor, MI

i m

ub

City of Chelsea, MI

S

02262009

Submitted Requests - Not Approved

6/1/2009

Route (Infrastructure Only)

811 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

O R

Washtenaw County

Construction start 120 days from approval of funds

Miller Drain Enclosure

Ypsilanti Township, MI

T O

s t s

P P A 6 months after start date

Funding Request

$

The Miller Drain is an older urban drain, currently in serious disrepair. It consists of an open channel nine (9) to twelve (12) foot vertical banks, and represents a safety hazard in an area adjacent to school and residential neighborhood. The 950,000 project

$

Reconstruction of 26,500 linear feet of stream channel crossings and enclosed pipe that provides stormwater management and drainage to approximately 40% of the urban Ann Arbor area. Assist in meeting a "Total Maximum Daily Load" phosphorus 6,300,000 reduction manda

D VE

-N

e u

q e R

Washtenaw County

construction start 90 days from approval of funds Malletts Creek Drain Repair and Restoration

City of Ann Arbor & Pittsfield Township, MI

Washtenaw County

Extension of fiber optic broadband data Entire County including all network to all Townships and Sheriff 20 Townships Substations

Washtenaw County Government is in the process of implementing a multi-year project to install a 104 mile fiber optic broadband data network. 3/15/2009

3/15/2011

Washtenaw County

Extension of fiber optic broadband data Entire County including all network to all Townships and Sheriff 20 Townships Substations

Washtenaw County Government is in the process of implementing a multi-year project to install a 104 mile fiber optic broadband data network. 3/15/2009

3/15/2011

$

3,838,952

Washtenaw County

Facility located in Lyndon Twp but serves Bridgewater Twp Dexter Twp Lima Twp Lyndon Twp Manchester Twp Sylvan Twp Manchester Village Western Washtenaw Recycling Authority City of Chelsea Facility Expansion

The Western Washtenaw Recycling Authority is a recycling program that is operated by an authority consisting of 8 units of government with a partnership with Washtenaw County. The Authority has created plans to expand their existing facility to increase recycling capacity and provide more reliable and efficient operations. Since the Authority’s creation in 1990 they have experienced increased participation by residents and increased population. 6/1/2009

5/1/2010

$

2,700,000

Washtenaw County

Northfield Township, MI

Replace undersized culverts under Earhart Road with a 3’ X 6’ concrete box culvert

$

145,000

tt i m

b u S

02262009

Earhart Road Culvert

d e t

Submitted Requests - Not Approved

1 year after start date

Yes

Route (Infrastructure Only)

812 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Lincoln Drive Drain

Replace storm water infrastructure in a residential area which has exceeded its expected service life and is failing. The system is undersized to handle the drainage Construction start area serviced. Flooding and road failures occur on a periodic basis due to pipe 60 days from 120 days after failures. approval of funds start date

$

585,000

Washtenaw County Jail and 14 A District Court Facility

Currently the Washtenaw County Service Center, home to the County Jail, Sheriff’s Department, Juvenile Detention Facility, 14A-1 District Court, Community Corrections office and the Learning Resource Center, has no main entrance road to the campus. This is the most heavily used and visited site in the county’s inventory. It is also intended to be the most secure site given the operations housed there. Unfortunately, while all these buildings have a presence and address on Washtenaw Avenue – a major State of Michigan Department of Transportation trunk road – none of them have access to that road. They must all be accessed off of a much small side street that also serves as the inmate transport and police operations entrance 10/1/2008

6/20/2010

$

2,500,000

Pittsfield Township, MI

County Jail Project-New energy efficient roof for existing 30 year old portion of County Jail

The Washtenaw County Jail, built in 1976, needs a new roof to prevent water infiltration and to increase the R value thereby reducing the County’s energy usage at this 24/7 operation. 10/1/2008

6/20/2010

$

350,000

Washtenaw County

Pittsfield Township, MI

The central energy plant, HVAC units and electrical distribution systems are original to New energy efficient equipment for 30 year old this building constructed in 1976. They need to be replaced to reduce the County’s energy usage. 10/1/2008 jail infrastructure

6/20/2010

$

4,500,000

Washtenaw County

Pittsfield Township, MI

Veteran Services – Energy efficiency improvement

7/1/2009

$

172,000

Pittsfield Township, MI

9-1-1 dispatch centers in Washtenaw County are managed by individual cities, townships, and county government. Several have expressed an interest in Consolidated Dispatch Center Multiconsolidating into the same facility. Since no current dispatch center would be large Jurisdictional facility for coordinated response enough to accommodate additional staff, a new facility would need to be constructed. 6/1/2009

6/20/2010

$

2,500,000

7/31/2009

$

285,000

Washtenaw County

Washtenaw County

Washtenaw County

Washtenaw County

Northfield Township, MI

Pittsfield Township, MI

T O

P P A

O R

N s

Infrastructure improvements to ensure a safe environment to provide public services and replace deteriorated building envelope to improve energy efficiency. 4/1/2009

t s e

u q e

Currently the Washtenaw County Service Center, home to the County Jail, Sheriff’s Department, Juvenile Detention Facility, 14A-1 District Court, Community Corrections office and the Learning Resource Center, has no main entrance road to the campus. This is the most heavily used and visited site in the county’s inventory. It is also intended to be the most secure site given the operations housed there. Unfortunately, while all these buildings have a presence and address on Washtenaw Avenue – a major State of Michigan Department of Transportation trunk road – none of them have access to that road. They must all be accessed off of a much small side street that also serves as the inmate transport and police operations entrance 10/1/2008 Replace inefficient energy control system with an automated energy management system to improve reliability and reduce energy consumption. 4/1/2009

D VE

Route (Infrastructure Only)

4/1/2010

R d

Washtenaw County

Pittsfield Township, MI

Washtenaw County

Ypsilanti

Washtenaw County

Washtenaw County

Ypsilanti

Ypsilanti

02262009

i m

ub

S

e t tt

· Washtenaw County Jail and 14 A District Court Facility Department of Human Services – Install Energy Management System Renovation of Public Health Services Complex including new energy efficient windows, modern labs and new IT infrastructure

The County’s public health and community mental health building was scheduled for a multi-million dollar renovation to bring it up to modern codes for life safety and energy efficiency. The project budget was cut to $1,000,000 due to the County’s budget situation and a major portion of the project scope was eliminated. 5/15/2009

12/31/2009

New 14A-2 Courthouse/Renovation to modernize courthouse with court technology and energy efficiency

The 14A-2 District Court is housed in a 1960’s era ex-grocery store building. It is highly energy inefficient and greatly deficient in serving as a secure modern courthouse.

4/1/2010

Submitted Requests - Not Approved

6/1/2009

813 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Washtenaw County

Washtenaw County

Project Name

Project Description

Start Date

Funding Request

Route (Infrastructure Only)

Ypsilanti Township, MI

Miller Drain Enclosure

The Miller Drain is an older urban drain, currently in serious disrepair. It consists of an open channel nine (9) to twelve (12) foot vertical banks, and represents a safety Construction start hazard in an area adjacent to school and residential neighborhood. The project would 120 days from 6 months after enclose one-half mile of existing open drain. approval of funds start date

$

950,000

Ypsilanti Township, MI

Removal of a decommissioned hydro-electric dam and site clean-up. An estimated 21,000 cubic yards of a contaminated material (type I or type II material; not yet determined) must be removed and disposed of. Structural removal of dam and construction start Willow Run Hydro-Electric Dam Removal and related facilities and reestablishment of stream channel are the other elements of this 90 days from 6 months after Environmental Remediation project. approval of funds start date

$

5,100,000

$

490,000

$

3,750,000

$

3,750,000

$

11,700,000

$

1,200,000

$

1,900,000

5/1/2010

$

Saginaw road from the City of Midland to 5 mile to Price Rd to Booster 4,309,000 station.

8/9/2009

$

Washtenaw County Washtenaw County Washtenaw County

East-West Commuter Rail

Washtenaw County

Washtenaw County Transit Expansion

Washtenaw County

Border to Border Trail Segment

Washtenaw County

9-1-1 dispatch centers in Washtenaw County are managed by individual cities, townships, and county government. Several have expressed an interest in Consolidated Dispatch Center Multiconsolidating into the same facility. Since no current dispatch center would be large Jurisdictional facility for coordinated response enough to accommodate additional staff, a new facility would need to be constructed.

WATER DISTRICT #1 City of Midland, Lincoln OF MIDLAND Township and Jerome COUNTY Township

Improvments to booster station including but not limited to expansion of Pump House furnishing and installation of three new 1,600-gpm booster pumps,as well as associated piping, fittings, valves and appurtenances; modifications and additions to the existing HVAC and electrical systems; site work including installation and removal of yard piping; connection to 16" AC transmission main; furnishing and installation of Generator; construction of gravel drive; fence removal and replacement; site restoration; sedimentation and erosion control. Transmission main project includes the construction of 25,000 lineal feet of 20" transmission main from Dublin Road and Saginaw Road to the price Road Booster Station, including hydrants, air release valves and valve boxes, gate valves,and construction of a metering station connection price road booster station improvements and to the City of Midland's water system. Inaddition, a controll valve will be installeed at the Jerome Township water tower. 5/1/2009 water transmission main improvements

T O

s t s

O R

P P A

This project, at Parker Mill County Park, includes a new bridge over Fleming Creek to provide access to an undeveloped portion of the park that was once the mill pond and mill race that powered the historic Mill. The County is proposing a new trail network that defines the old pond location seating areas, interpretive signage (explaining history and environment), and a unique pavilion with a “green” roof. Construct five stations and institute operations for a north-south commuter rail from Howell to Ann Arbor on existing track. Construct five stations for an east-west commuter rail from Detroit to Ann Arbor Michigan on existing track. Expand transit to provide access between small community centers outside of the urban area and the City of Ann Arbor employment hub. This 2500’ non-motorized trail is a key component of a planned 35 mile trail across Washtenaw that will eventually connect Livingston & Wayne

Post Family Trail and Pavilion Commuter Rail Project-WALLY North-South Commuter Rail

Water WorksTheatre Company, Inc.

Expected Completion Date

-N

e u

d e tt

t i m

b u S

Royal Oak

02262009

Macbeth

q e R

Water Works Theatre will present an outdoor, professional production of William Shakespeare's tragedy Macbeth. Water Works Theatre is Michigan's only outdoor professional Shakespeare Theatre. This production will employ over 25 Michigan artists and will be seen by approximately 2,000 audience members. The city of Royal Oak will see economic benefits from our audience members who patronize restaurants, bars and local retail shops. 7/23/2009

Submitted Requests - Not Approved

D VE

50,000

814 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Waterfliet Charter Township - Cynthia LaGrow

Waterford Township

Watervliet

Waterford Township

Project Name

Project Description

Start Date

Expected Completion Date

K Park

The proposed project is a new park development to protect the natural asset of the Paw Paw River in the Charter Township of Watervliet, County of Berrien and State of Michigan. The Charter Township of Watervliet will use local funds and grant dollars to purchase fee simple title in 22+ acres of property in K Park used for nature viewing, fishing, canoeing, playground and walking paths that are universally accessible to persons of all abilities. The township will maintain the park using general fund parks and recreation budget. Currently, the township has the funds available for the local match and would like to move forward on the acquisition and development in the next 60-90 days. 2/15/2009

Waterford Clinton River Riverwalk Phase IV Project

Complete final phase of Clinton River Riverwalk from its current terminus under M-59 easterly up the northeast riverbank to the existing pedestrian pathway on the north side of M-59. Construct 6.5 miles of nonmotorized greenway along Pontiac Lake Road from the Oakland County Civic Center and into Pontiac State Recreation Area. This project possesses construction plans completed through greenways initiative grant funding provided by the nonprofit Community Foundation.

T O

O R

D VE $

180,000

6/1/2010

$

100,000

8/1/2009

12/1/2010

$

4,000,000

5/1/2009

12/1/2009

$

48,000

P P A

6/1/2009

Funding Request

Waterford Township

Waterford Township

Pontiac Lake Road Greenway Project

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 300 lineal ft. of Blanchard Ct., currently a gravel road and in need of paving.

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 400 lineal ft. of Arcola, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

64,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 500 lineal ft. of Doremus, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

80,000

Waterford Township

Waterford Township

5/1/2009

12/1/2009

$

96,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 600 lineal ft. of Oak, currently a gravel road and in need of paving. Waterford Subdivision Street Pavement Restoration Project Remove and repave 1,000 lineal ft. of deteriorated pavement on Frankman.

5/1/2009

12/1/2009

$

100,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 700 lineal ft. of Fullerton, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

112,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 800 lineal ft. of Floriman, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

128,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 900 lineal ft. of Bridge, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

144,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 1,000 lineal ft. of Otter Beach, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

160,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 1,100 lineal ft. of Ida, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

176,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 1,200 lineal ft. of Lanore, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

192,000

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

s t s

-N

e u

eq

e t t

it

m b u

R d

Waterford Gravel Road Improvement Project Pave 1,300 lineal ft. of Old Lane, currently a gravel road and in need of paving. Waterford Subdivision Street Pavement Restoration Project Remove and repave 2,500 lineal ft. of deteriorated pavement on Mariner.

5/1/2009

12/1/2009

$

208,000

5/1/2009

12/1/2009

$

250,000

Waterford Township

Waterford Gravel Road Improvement Project Pave 1,700 lineal ft. of Murray, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

272,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 1,800 lineal ft. of Mather, currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

288,000

Waterford Township

Waterford Township

Waterford Gravel Road Improvement Project Pave 2,600 lineal ft. of Coomer Rd., currently a gravel road and in need of paving.

5/1/2009

12/1/2009

$

416,000

12/30/2010

$

4,000,000

Waterford Township

S

Waterford Township

02262009

Waterford Fire Station No. 4 Project

Build a new Fire Station No. 4 building to replace the existing 60 year old functionally obsolete building. This fire station serves the northeast quadrant of the Township and also serves as a fire vehicle maintenance facility. 9/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

815 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Start Date

Project Name Waterford Bikepath Pavement Restoration Project

Project Description Repair and replace 1,200 lineal ft. of deteriorated sections of bikepath along M-59, Walton Blvd., Elizabeth Lake Road, and Cooley Lake Road.

4/1/2009

12/1/2009

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 25 percent of the existing sidewalk in the Parkwood Shores subdivision are in a state of failure. To address this issue, 2,000 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

12/1/2009

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 30 percent of the existing sidewalk in the Vista Villa subdivision are in a state of failure. To address this issue, 2,100 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

12/1/2009

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 20 percent of the existing sidewalk in the Cambellgate Farms subdivision are in a state of failure. To address this issue, 2,200 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 40 percent of the existing sidewalk in the Huntoon Shores subdivision are in a state of failure. To address this issue, 2,400 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced.

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 30 percent of the existing sidewalk in the Lakeland Estates subdivision are in a state of failure. To address this issue, 3,600 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 40 percent of the existing sidewalk in the Holiday Farms subdivision are in a state of failure. To address this issue, 4,000 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced.

42,000

$

44,000

12/1/2009

$

48,000

12/1/2009

$

72,000

4/1/2009

12/1/2009

$

80,000

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 40 percent of the existing sidewalk in the Williamsburg Green subdivision are in a state of failure. To address this issue, 4,800 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

12/1/2009

$

96,000

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 25 percent of the existing sidewalk in the Lake Oakland Heights subdivision are in a state of failure. To address this issue, 5,500 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

12/1/2009

$

110,000

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 30 percent of the existing sidewalk in the Watkins Hills subdivision are in a state of failure. To address this issue, 6,600 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

12/1/2009

$

132,000

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 40 percent of the existing sidewalk in the Waterford Meadows subdivision are in a state of failure. To address this issue, 7,600 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009

12/1/2009

$

152,000

12/1/2009

$

240,000

11/15/2009

$

250,000

A T

e u

st

eq

s

O N

Waterford Township

Waterford Township

Waterford Street Tree Restoration Project

Waterford Subdivision Sidewalk Pavement Restoration Project

Over 40 percent of the existing sidewalk in the Huron Gardens subdivision are in a state of failure. To address this issue, 26,000 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced.

R d

i m

Waterford Subdivision Sidewalk Pavement Restoration Project Waterford Drainage Retention Basin Restoration Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project

ub

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

S

02262009

e t tt

O R

PP

4/1/2009

Waterford Subdivision Sidewalk Pavement Restoration Project

Waterford Township

D VE

12/1/2009

4/1/2009

12/1/2009

$

520,000

Over 75 percent of the existing sidewalk in the Elizabeth Lake Estates subdivision are in a state of failure. To address this issue, 30,000 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009 Repair 150 existing drainage retention basins throughout the Township to restore drainage functionality. 4/1/2009

12/1/2009

$

600,000

12/30/2009

$

950,000

Remove and repave 300 lineal ft. of deteriorated pavement on Pleasant Woods.

5/1/2009

12/1/2009

$

30,000

Remove and repave 400 lineal ft. of deteriorated pavement on Emburke.

5/1/2009

12/1/2009

$

40,000

Remove and repave 500 lineal ft. of deteriorated pavement on Heitsch.

5/1/2009

12/1/2009

$

50,000

Remove and repave 600 lineal ft. of deteriorated pavement on Globe.

5/1/2009

12/1/2009

$

60,000

Remove and repave 700 lineal ft. of deteriorated pavement on Steffens.

5/1/2009

12/1/2009

$

70,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

30,000

$

Waterford Township

Waterford Township

$

40,000

Waterford Township

Waterford Township

Funding Request

$

Over 60 percent of the existing sidewalk in the Lotus Lake subdivision are in a state of failure. To address this issue, 12,000 lineal ft. of deteriorated sections of sidewalk need to be removed and replaced. 4/1/2009 Plant 1,000 residential street trees to replace street trees removed due to disease and infestations such as the emerald ash borer. 5/1/2009

Waterford Township

Expected Completion Date

816 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Waterford Township

Project Name Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project

Warren Drive Dual cul de sac Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project Waterford Subdivision Street Pavement Restoration Project

ub

tt i m

02262009

S

d e t

Project Description

Start Date

Expected Completion Date

Funding Request

Remove and repave 800 lineal ft. of deteriorated pavement on Smoke Tree Way.

5/1/2009

12/1/2009

$

80,000

Remove and repave 900 lineal ft. of deteriorated pavement on Conne Mara.

5/1/2009

12/1/2009

$

90,000

Remove and repave 1,100 lineal ft. of deteriorated pavement on Tipperary.

5/1/2009

12/1/2009

$

110,000

Remove and repave 1,200 lineal ft. of deteriorated pavement on Cambrook.

5/1/2009

12/1/2009

$

120,000

Remove and repave 1,400 lineal ft. of deteriorated pavement on Sheryl.

5/1/2009

$

140,000

Remove and repave 1,500 lineal ft. of deteriorated pavement on Reymont.

5/1/2009

12/1/2009

$

150,000

Remove and repave 1,600 lineal ft. of deteriorated pavement on Jeffwood.

5/1/2009

12/1/2009

$

160,000

A T

PP

O R 12/1/2009

D VE

Remove and repave 1,800 lineal ft. of deteriorated pavement on Huntington.

5/1/2009

12/1/2009

$

180,000

Remove and repave 2,000 lineal ft. of deteriorated pavement on Ledgestone.

5/1/2009

12/1/2009

$

200,000

Remove and repave 2,200 lineal ft. of deteriorated pavement on Loch Leven.

5/1/2009

12/1/2009

$

220,000

Remove and repave 2,300 lineal ft. of deteriorated pavement on Van Zandt.

5/1/2009

12/1/2009

$

230,000

Remove and repave 2,400 lineal ft. of deteriorated pavement on Lynn.

5/1/2009

12/1/2009

$

240,000

5/1/2009

12/1/2009

$

260,000

Remove and repave 2,800 lineal ft. of deteriorated pavement on Irwin.

5/1/2009

12/1/2009

$

280,000

Remove and repave 3,000 lineal ft. of deteriorated pavement on Pleasant.

5/1/2009

12/1/2009

$

300,000

Separate existing Warren Drive into two streets, one serving industrial properties accessed from Dixie Hwy. and the other serving residential properties accessed from Frembes; the separation will occur through construction of a dual cul-de-sac system. Engineering plans have been completed and easements acquired. 6/1/2009

12/1/2009

$

300,000

Remove and repave 3,400 lineal ft. of deteriorated pavement on Tilden.

5/1/2009

12/1/2009

$

340,000

Remove and repave 3,500 lineal ft. of deteriorated pavement on Southshore.

5/1/2009

12/1/2009

$

350,000

Remove and repave 3,700 lineal ft. of deteriorated pavement on Percy King.

5/1/2009

12/1/2009

$

370,000

Remove and repave 4,000 lineal ft. of deteriorated pavement on Midland.

5/1/2009

12/1/2009

$

400,000

Remove and repave 4,500 lineal ft. of deteriorated pavement on Oregon.

5/1/2009

12/1/2009

$

450,000

Remove and repave 5,000 lineal ft. of deteriorated pavement on Shoreline.

5/1/2009

12/1/2009

$

500,000

Remove and repave 6,000 lineal ft. of deteriorated pavement on Motorway.

5/1/2009

12/1/2009

$

600,000

st

s

O N

Remove and repave 2,600 lineal ft. of deteriorated pavement on Meadowlark.

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

817 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Watervliet Charter Township

Watervliet Charter Township

Watervliet Charter Township - Cynthia LaGrow Watervliet Public Schools

Waucedah Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Paw Paw Lake Sanitary Sewer Upgrades

Watervliet Township has a sanitary sewer collcetion system around Paw Paw Lake which is in dire need of repair. There are four lift stations which need to be upgraded with new valving, pumps and stand-by generators.The old lift stations are the cause of large amount of operation and maintenace time and money. Also the collection system which flows into these lift stations has deteriorated to a point where a large amount of ground/lake water is enetering the system through cracked pipes and bad joints. The Township has been struggling with the cost to upgrade this system with the desire to decrease the time and money spent on maintaining the system as well as the cost of treating all the groundwater which enters the system. 4/1/2009

Paw Paw Lake Water System

The Charter Township of Watervliet would like to expand their water system into a densely populated portion of their community. The area around Paw Paw Lake currently is on a individual wells which are very shallow and the water quality can be questionable at times. The project was looked at several years ago and the costs associated with the work made the petition process difficult to pass. The Township would like to expand their customer base into this area to create a larger customer base which would allow them the financial opportunity to upgrade the balance of thier system. 4/1/2009

Watervliet

COPS

This will be an intergovernmental project crossing 6 jurisdictional boundaries and two school systems to have a school police officer. With the increase in school violence and the changes with students accessing drugs at much earlier ages, Watervliet and Coloma Schools want to have a community police officer allowing the students someone other than a school officials to talk to and go to with problems or issues that may involve school violence. 4/1/2009

6/1/2015

Watervliet City

Network Upgrade

Network Upgrade to connect elementaries via fiber lines, and upgrade networks

10/31/2009

$

880,000

Red Dam

Reconstruction of dam intake/drainage structures, dam embankment, dam spillway and erosion control measures to eliminate possible dam failure and correct on-going erosion and sedimentation issues. Aug. 1, 2009

Sept. 30, 2009

$

130,000 NA

9/30/2010

$

538,273

Watervliet Charter Township

Watervliet Charter Township

Waucedah Township, Dickinson County

T O

eq

$

Various locations around Paw Paw 1,060,000 Lake

$

Numerous roads around Paw Paw 6,600,000 Lake

P P A

N s

st

e u

O R 12/1/2009

D VE

7/1/2009

12/1/2010

R d

Wellington Farm, USA Phase I

To bring Wellington Farm, USA to its full potential as a 60-acre living history farm depicting life during the Great Depression, as a major contributor to the economy of the Crawford /Roscommon County community, as a significant contributor to the preservation and interpretation of local, regional and national history and, as a noteworthy source of employment for the surrounding communities, the following will be accomplished. The completion of the restoration of the Stittsville Church; landscaping of grounds surrounding the church; construction of restroom facilities; construction of an Education Center; construction of six new interpretive sites, a Cream Station, a Cobbler's Shop, a Broom Maker's Shop, a Planer Building, a Steam Shed and an Octagon Barn; the renovation of a historic CCC building into a museum complex; the development and installation of a wind powered electrical system; and the installation of a renewable energy source heating system which will provide heat and hot water for the Stittsville Church and three adjacent buildings. To complete this building in a timely fashion, a significant number of construction laborers would be em 4/15/2009

West Bloomfield Township

West Bloomfield Township, Oakland County

Replacement with High Efficiency Heater

Replace forced air heating system in WS Building Mantainance Shop with LD Gas Tube Radiant Heaters

2/1/2009

4/1/2009

$

68,000

West Bloomfield Township

West Bloomfield Township, Oakland County

High efficiency weather proofing

Weather proofing and insulation upgrade

4/1/2009

8/1/2009

$

22,000

i m

b u S

Wellington Farm Park, Inc. Beaver Creek Township

02262009

e t tt

Submitted Requests - Not Approved

818 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

West Bloomfield Township

West Bloomfield Township, Oakland County

Fiber Internet Firewall Project

Replace mission critical non-redundant old Firewall Server with redundant energy efficient UTM Hi Availability Cluster which will allow better protection of data resources and increase public safety capabilities hampered by non solvable issues with current version. 3/1/2009

West Bloomfield Township

West Bloomfield Township, Oakland County

High Efficency Weather Proofing

Weather-proofing & Insulation Upgrades

4/1/2009

West Bloomfield Township

West Bloomfield Township, Oakland County

High efficiency electrical lighting

Lighting upgrade

4/1/2009

West Bloomfield Township

West Bloomfield Township, Oakland County

Halon Replacement Project

Replace the existing Halon Fire Suppression system which is an ozone damaging system with a environmentally friendly system. This system protects the core hardware and data systems of the township

4/1/2009

West Bloomfield Township

West Bloomfield Township, Oakland County

High Efficiency Electrical Lighting

Lighting Upgrade

West Bloomfield Township

West Bloomfield Township, Oakland County

High Efficiency Flat Roof System

Town Hall Flat Roof System Weatherproofing & Energy Update

West Bloomfield Township

West Bloomfield Township, Oakland County

Efficient gun range filtration

Gun range filtration blower

West Bloomfield Township

West Bloomfield Township, Oakland County

Efficient generator

Police Department generator upgrade

West Bloomfield Township

West Bloomfield Township, Oakland County

High Efficiency Emergency Generator

Town Hall Emergency Generator Upgrade

West Bloomfield Township

West Bloomfield Township, Oakland County

High efficiency HVAC

West Bloomfield Township

West Bloomfield Township, Oakland County

High Efficiency HVAC Systems

West Bloomfield Township

West Bloomfield Township, Oakland County

Update Existing Business Processes

tt i m

West Michigan Academy of Environmental Science Walker

d e t

West Michigan Academy of Environmental Science

ub

West Michigan Academy of Environmental Science Walker

West Michigan Academy of Environmental Science

Expected Completion Date

$

39,000

$

46,692

$

60,000

7/1/2009

$

65,000

4/1/2009

7/1/2009

$

157,020

4/1/2009

7/1/2009

$

180,000

4/1/2009

8/1/2009

$

200,000

4/1/2009

8/1/2009

$

215,000

4/1/2009

7/1/2009

$

215,000

Heating and cooling upgrades

4/1/2009

8/1/2009

$

400,000

Heating & Cooling Upgrades

4/1/2009

10/1/2009

$

544,497

Replace outdated system software

7/1/2009

12/31/200

$

157,000

$

6,000,000

$

150,000

T O

s t s

e u

q e R

6/1/2009

O R

P P A

-N

4/1/2009

Funding Request

8/1/2009

To construct an Elementary (Grades K-6) Facility by GREEN standards.

To enhance technology with wireless broadband connectivity, two modern computer labs, and classroom smart boards.

9/1/2009

D VE

Route (Infrastructure Only)

S 02262009

Submitted Requests - Not Approved

819 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Western Washtenaw Recycling Authority

Project Name

Project Description

Start Date

WWRA expansion project

The Western Washtenaw Recycling Authority (WWRA), comprised of 8 municipalities on the western side of Washtenaw County, has successfully served participating communities for 18 years. For each of the last 3 years, WWRA and has collected, baled and sold 4,000 tons of materials, and is on track for 4,500 tons in 2009. WWRA’s facilities can no longer efficiently handle these increasing volumes. Storage is at a premium and equipment is worn out and desperately in need of replacement. WWRA hired an expert in recycling facility design to create the most efficient sorting, storage and baling system possible with the intent that the new facility will serve for 2 more decades. The current quotes estimate a completion cost of $2,700,000, with construction planned for this spring. WWRA set aside $500,000 for the new facility and planned to cover the other $2,200,000 through a bond. However, the board has put the project on hold because asking for a 15-year special assessment of $18 to $20/year in this economic climate is deemed politically impractical. If, however, a significant off-set of this assessment is procured from the federal stimulus money, a boMay/June, 2009

Facility located in Lyndon Twp but serves Bridgewater Twp Dexter Twp Lima Twp Lyndon Twp Manchester Twp Sylvan Twp Manchester Village City of Chelsea WWRA expansion project

The Western Washtenaw Recycling Authority (WWRA), comprised of 8 municipalities on the western side of Washtenaw County, has successfully served participating communities for 18 years. For each of the last 3 years, WWRA and has collected, baled and sold 4,000 tons of materials, and is on track for 4,500 tons in 2009. WWRA’s facilities can no longer efficiently handle these increasing volumes. Storage is at a premium and equipment is worn out and desperately in need of replacement. WWRA hired an expert in recycling facility design to create the most efficient sorting, storage and baling system possible with the intent that the new facility will serve for 2 more decades. The current quotes estimate a completion cost of $2,700,000, with construction planned for this spring. WWRA set aside $500,000 for the new facility and planned to cover the other $2,200,000 through a bond. However, the board has put the project on hold because asking for a 15-year special assessment of $18 to $20/year in this economic climate is deemed politically impractical. If, however, a significant off-set of this assessment is procured from the federal stimulus money, a boMay/June, 2009

City of Chelsea, MI, located in Lyndon Township

O R

Wexford Missaukee ISD Wexford Missaukee ISD

Wexford Missaukee ISD

Cadillac

Multi-Purpose Meeting Room

Cadillac

Parking Lot Resurfacing

itt

Cadillac

d e t

Special Services Roof Replacement

bm

P P A

Funding Request

$

500,000

April/May 2010

$

2,700,000

Construct a 2,500 square foot multi purpose meeting room on our campus. Currently all of our staff and/or students can not meet in any one place in our facilities. This room would be open for use by the community, as well as state and local groups. 9/1/2009

12/31/2010

$

750,000

Our parking lots require resurfacing to extend their useful life.

6/1/2009

8/31/2009

$

45,000

Replace roof on special services building. Existing roof is well past expected useful life. On-going repair costs necessitate replacement of this roof. We hope to realize heating and cooling efficiencies with a new and better insulated roof system.

6/1/2009

8/31/2009

$

200,000

N s

t s e

qu

e R

Whaley Historical House Association

Flint

Wheatland Township

Wheatland Township

Block Grant

Project would include a series of green initiatives designed to improve institutional sustainability. Green Upgrades projects would include the installation of storm windows with UV filtering to reduce energy costs and assist in the preservation of the museum's collection; conserve water by installing underground cistern to water museum grounds and gardens; and improve energy efficiency through repairs and restoration to the exterior masonry and greenhouse. 4/1/2009 Block Grant Program to allow residential and commercial energy audits for all residents and businesses in Wheatland Township 4/1/2009

Wheatland Township

Wheatland Township

New Hall

New Town Hall (energy efficient) 4600 sq ft with water and septic green concepts

5/1/2009

12/1/2009

$

850,000

Wheatland Township

Wheatland Township

Ditching

Ditch & Berm 40 miles of gravel road

6/1/2009

7/2/2009

$

1,600,000

02262009

u S

Green Upgrades

Route (Infrastructure Only)

D VE

April/May 2010

T O

Western Washtenaw Recycling Authority

Expected Completion Date

Submitted Requests - Not Approved

10/1/2009

$

71,453

8/1/2009

$

125,000

820 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Wheatland Township

Wheatland Township

Culvert

New culvert on Wheatland Road to replace old one

4/1/2009

6/1/2009

$

55,000

Wheatland Township

Wheatland Township

Waldron Rd Resurface

Resurface Waldron Rd. from Culbert Rd to Addison Rd. 6 miles

4/30/2009

7/1/2009

$

1,800,000

Wheatland Township

Wheatland Township

Waldron Rd Culverts

Replace 7 Culverts on Waldron Rd

4/30/2009

7/1/2009

$

480,000

Wheatland Township

Wheatland Township

Jerome Rd

Resurface Jerome Rd PASER rating of 3 (4 miles)

5/1/2009

7/1/2009

$

600,000

Wheatland Township

Wheatland Township

North Adams Rd

North Adams Road 6 miles of resurfacing PASER rating of 4

5/1/2009

$

900,000

Wheatland Township

Wheatland Township

Addison Rd.

Resurface Addison Road 6 miles PASER rating of 4

6/1/2009

$

900,000

Wheatland Township

Wheatland Township

Gravel

Gravel all Dirt roads (40 miles)

5/1/2009

8/1/2009

$

2,000,000

Wheatland Township

Addition to current hall

Add addition to current hall to add septic water bathroom and sink

5/1/2009

8/1/2009

$

58,500

Ditching

Ditch & Berm 40 miles of gravel road

6/1/2009

7/2/2009

$

1,600,000

New Hall

New Town Hall (energy efficient) 4600 sq ft with water and septic green concepts

5/1/2009

12/1/2009

$

850,000

Addition to current hall

5/1/2009

8/1/2009

$

58,500

Block Grant

Add addition to current hall to add septic water bathroom and sink Block Grant Program to allow residential and commercial energy audits for all residents and businesses in Wheatland Township

4/1/2009

8/1/2009

$

125,000

Wheatland Township Wheeler Township Wheeler Township

Wheatland Township Wheatland Township, Hillsdale County Wheatland Township, Hillsdale County Wheatland Township, Hillsdale County Wheatland Township, Hillsdale County Wheatland Township, Hillsdale County Wheeler Township Wheeler Township

PP

6/22/2009

Gravel Village street resurfacing Wheeler Rd. resurfacing

Gravel all Dirt roads (40 miles) Resurfacing of 1/2 mile of Village streets (7 blocks) Resurfacing of 1/2 mile of Wheeler Rd. south of M-46

5/1/2009 5/1/2009 5/1/2009

8/1/2009 5/25/2009 6/1/2009

$ $ $

2,000,000 120,000 225,000

White Lake Township

White Lake Charter Township, Oakland County

M-59 East Contract 7 Warermain and pressure Sewer

Extend the watermains along M-59 from Lowe's to east of Pontiac Lake Road, and wil extend the watermain both north and south along Pontiac Lake Road. Total length of watermain is 4,193 l.f. and toal length of pressure sewer is 5,522 l.f. 3/9/2009

$

921,000

Complete the M-59 watermain loop to provide water to St. Joseph medical office and Cranberry Meadows Subdivision. Pressure sewer would run from BP gas station to Brew Bob's bar. Total watermian is estimated at 7,909 l.f. and pressure sewer at 2,550 l.f. July, 2009

$

1,415,000

Wheatland Township Wheatland Township Wheatland Township Wheatland Township

e u

st

eq

s

A T

O N

O R 6/1/2009

R d

D VE

White Lake Township

White Lake Charter Township, Oakland County

M-59 East Contract 8 Warermain and pressure Sewer

White Lake Township

White Lake Charter Township, Oakland County

Western Outlet Sanitray Sewer Extension

Will allow development of new properties and sewer connection of existing properties, particually in the lakes areas. Aug., 2009

$

4,196,000

White Lake Township

White Lake Charter Township, Oakland County

Hurondale High Service Pump

Pump ground water from Twin Lakes I well southeasterly into the high pressure south service district. March, 2009

$

199,000

The secondary well at this 40 plus year old well house is failing and it is necessary to install a new well the same capacity as the primary well. June, 2009

$

363,000

White Lake Township Whiteford Township Whiteford Township

Whitehall Township

e t t

t i m

ub

White Lake Charter Township, Oakland County Whiteford Township, Monroe County Whiteford Township, Monroe County

S

Whitehall Township

02262009

Twin Lakes I Well House Upgrade

Ottawa Lake Sewer System

Water System

Sewer System for a town Water line, to extend to areas affected by E-coli contamination in the ground water drinking aquifer.

Sanitary Sewer Extension to Hilt's Landing

Extend existing sanitary sewer north in Durham Road to serve development at the Township's Hilt's Landing Site. The Township is proposing to develop a historical learning center on the site.

Submitted Requests - Not Approved

5/9/2009

11/9/2009

$

2,500,000

Immeadiate

9/9/2009

$

5,000,000

5/9/2009

7/9/2009

$

Route (Infrastructure Only)

170,000 Durham Road

821 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Whitehall Township

Whitehall Township

Williams Township

Williamston Theatre

Winans Academy of Performing Arts Dominican Campus

Start Date

Industrial Park Water Main Loop

Whitehall Township

Township funded improvements to support the redevelopment of the former County wastewater treatment site. A private developer is proposing to redevelop the brownfield site; two of the uses being considered are ethanol production and biopower Wastewater Property Redevelopment Project generation.

Williams Charter Township, Bay County

Williamston

Detroit

Road Corridor Water, Sanitary Sewer, and Roadway Improvements for new Michigan State Police Complex

Extend waterline and sanitary sewer lines to new Michigan State Police Complex and Anchor Zone area and upgrade 1-1/2 miles of Flajole Road to a primary, asphalt, county road to provide better access and response for personnel from the new MSP Complex . In addition, this will provide critical infrastructure to an industrial area within the 10 mile Anchor Zone around Hemlock Semiconductor Corporation (HSC). 5/1/2009

2009 Capital Improvement Projects

The Williamston Theatre will be doing capital improvements to the theatre's building including: upgrading the restroom facility to meet the requirements of the State's Barrier Free requirements, re-structuring the backstage and house to increase the capacity of the theatre and make improvements to the building's HVAC system to increase efficiency.

Broadband Repeater

Williamstown Township has installed Broadband high speed internet service to serve our residents due to no other service being available and/or no prospect of expansion by current providers that currently serves a portion of the township. A repeater system is needed to expand services to all residents who are not currently able to be served due to topography. Aug. 2009

Winans District - Winans Academy of Performing Arts K-5 Dominican Campus

This project is the construction of a performing arts and kindergarten wing. The schoo is a performing arts one located on the eastside of Detroit. Presently, the student population has outgrown the school and a need for more dance studios, vocal rooms, and musical instrumental rooms is apparent. In addition, a state of the art kindergarten wing that includes larger classrooms, equipped for the best environment to teaching and learning is greatly needed. The new wing will have technology to serve both performing arts and kindergartners. 5/1/2009

Performing Arts and Kindergarten Enhancement

Detroit

b u S Breckenridge/Gratiot County

02262009

Wind Resource Wind Farm

A T

s

t s e

O N

7/9/2009

8/10/2009

u q e

$

D VE

Easement between Durham and Silver 260,000 Creek Roads.

1,000,000

$

1,391,803 NA

9/30/2009

$

91,125 N/A

Sept., 2009

$

20,000 NA

1/1/2010

$

O R

The project is to build an additional wing to the present structure that will enhance and advance the instrumental program to not only include violins but percussion and wind instruments with use of technology. In addition, the project also entails a complete restructuring of kindergarten classrooms in size, technology, and best practices that are age appropriate. 5/1/2009

9/1/2009

The Wind Resource (WR) Gratiot and Saginaw 200 MW Wind Project is planned for 2010-2011 Commercial Operation. Wind Resource is respectfully requesting $1,500,000 to complete the development of the Wind Resource Wind Farm. Wind Resource, LLC has developed the Project, securing approvals, negotiating Easement Agreements that embrace community values, obtaining certain permits, convening meetings and providing public education. Two (2) 60 meter meteorological towers have recorded 12+ months of wind data. Wind Resource currently holds competitive MISO Queue position G905, which is first in the MISO Queue in Gratiot County. Wind Resource has also been actively pursuing power sales agreements and support with Project Financing. Phase I of the 200 MW Wind Resource LLC Gratiot – Saginaw Wind Project is being planned for a 2010 Commercial Operation to serve Hemlock Semiconductor Corporation (HSC). HSC is investing $1 billion dollars to expand their existing facility, located 11 miles due east of the Wind Resource Project. This expansion will require 350 MW of new generation. Phase II and III of the Project couldOctober, 2007

September, 2010

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

$

PP

R d

e t tt

i m

Wind Resource, LLC

Project Description

Install 12" water main north along Durham Road, then in an easement to the east thru the Township's Industrial Park to Silver Creek Road and connect to the end of the existing water main in Silver Creek Road. This project will provide more water reliability in the Township's Industrial Park. 5/9/2009

Whitehall Township

Williamstown Township, Williamstown Township Ingham County

Winans Academy of Performing Arts

Project Name

Expected Completion Date

500,000

822 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wolverine Power Supply Cooperative

Woodland Park Academy

Woodmont Academy

Woodmont Academy

Project Name

Start Date

Wolverine Demand Response

Demand Response (DR) programs, as they are currently being designed and implemented, do not prioritize energy efficiency. DR programs that have been particularly successful at delivering peak load reductions have not reduced overall energy consumption. As Michigan prepares to pursue demand response programs on a large scale, it is imperative that DR programs are designed to achieve both peak load reductions and overall efficiency improvements cost effectively. Our proposed project rises to meet that challenge. We are proposing to implement the first residential DR pilot program in the United States that makes energy efficiency a central design objective. This program would combine more traditional approaches to pursuing residential energy efficiency improvements and demand response with new academic insights into how information can be used to change behavior, and the technological capabilities of two way automatic communication system (TWACS) metering infrastructure already installed in over 100,000 Michigan households. The program we propose is a residential program that integrates energy efficiency (EE) int 4/1/2009

Grand Banc Township

Woodland Park Academy

In September 2007, we opened a new facility, increasing our enrollment from approximately 320 to 400 students, our at-risk population from 10%-50%, and our special education more than doubled 70+ students. Over half of our population comes from the Flint City School District. We were recognized last year by GISD for closing the achievement gap by 60% in both ELA and Math. WPA parents are happy to have a nurturing school that addresses academic gaps through intervention programs.

Southfield

Development of a 7th grade thru 12th grade Full High School at a nearby site in Southfield, Mich. Building would include. Approximately 20 classrooms plus Office Space, Auditorium, Parent Room, Cafeteria and Commercial Kitchen, Staff Lounge, Biology labs (2), Chemistry labs (2), Technology Center, Library, Gymnasium, Athletic Woodmont New School Building Construction Fields, Furnace Room, Utility Room, Locker Rooms, Parent Rooms etc... 6/13/2009

Cadillac

Southfield

Detroit

02262009

T O

d e tt

t i m

WoodmontCapital Upgrades

Woodward Public School Academy

O R

P P A

-N

Funding Request

3/31/2011

$

9/2/2010

$

Capital Upgrades for K-6 facility including Renovation to Central Air and Heating currently Hot-water Baseboard Boiler System and no Air Conditioning. Renovation of Bathroom with Upgrades to allow low flow urinals (Greening) (Men's Bathrooms) and bowls all bathrooms (Greening), new stalls, new water efficient sinks (Greening), Modernization and repair of Playground including Upgrades, Bleachers for outside Ba Field, Rolling Bleachers for Gymnasium. Modernization of Energy efficient windows to replace metal frame windows (Greening). Modernization of Interior lighting Energy saving(Greening) upgrades, currently Incandescent inefficient lighting. Renovate current building to allow expansion to add 4+ classrooms on South side of Building. 6/13/2009

9/2/2009

$

Woodward Academy is a four-story single structure in the Greek Town area (Downtown Detroit) serving approximately 700 students in pre-kindergarten through 8th grades. The facility is dated and in need of renovations. School leaders have completed their due diligence in retrieving quotes/estimates on several renovation projects to begin immediately. These major projects are aimed at significantly increasing energy efficiency, and taking measures for greening the facility. These immediate major renovations include the installation of new energy efficient window/doors, and installation of a new boiler system to replace the current steamheat system. The Academy Team is planning strategically, which involves creating a timeline for the completion of projects, the creation of a capital projects fund, and partnering with area institutions to provide additional services with cost sharing measures. These immediate renovations will serve as an initial phase to upgrade the building, save energy, continue to beautify the Greek Town area, and create both short term and long term employment opportunities that otherwise would not have bee4/1/2009

7/1/2009

$

s t s

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

9/2/2009

e u

b u S Woodward Public School Academy

Project Description

Expected Completion Date

997,624

12,000,000 New Construction

550,000 Infrastructure

2,109,012

823 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Worldwide Energy Conservation and Research Exploration, LLC Detroit

Plug-In Emergency Housepower Unit

Production of the Plug-In Emergency Housepower Unit which supplies emergency electrical power in an environmentally friendly manner utilizing solar panel units and patented electrical storage and charging system. The unit is portable, can be utilized indooors, stores and emits power in two ways, has no emissins and is self-contained. It provides a continual source of power for up to 12 hours before recharging. The unit is afforadable for moderate to low income families. This project would involve the opening of a factory in Detroit, provide 214 direct and indirect jobs, training and research. The jobs would also be particularly suited for disabled veterans due to the sit-down nature of several tasks in the assembly procss. The system was designed and built by inventors from Detroit. In addtion to the number of jobs created the, jobs will be preserved through the broad impact of the product from design and production of molds, build, shipping and retailing preserving jobs across multiple industries and retail sites. 2/9/2009

Wyandotte Municipal Services

Woody Biomass Power Project

This project will convert a coal-fired utility boiler to a 12 megawatt, waste-wood biomass generator that will serve 6,000 homes with clean renewable energy.

Wyandotte Municipal Services Wyandotte Municipal Services Wyandotte Municipal Services Wyandotte Municipal Services

Wyandotte, MI

Wyandotte, MI

Green Schools Solar Roof Project

Wyandotte, MI

Green Utility Vehicle Fleet

Wyandotte, MI

River Dredging & Maintenance

Wyandotte, MI

Green Windpower on Brownfield Project

d e tt

Z-GEN Energy

t i m

ub

Z GEN ENERGY CORP. Detroit Biodiesel Plant Phase 1

Detroit

Expected Completion Date

T O

P P A

O R 8/9/2009

The project will combine standard photovoltaic electricity-generating technology with solar thermal technology in order to power and provide hot water for the City’s Theodore Roosevelt High School. Additionally, the solar panels will track the sun on an axis in order to increase exposure to its rays as it moves across the sky. Wyandotte will convert 11 utility fleet vehicles to American-made, zero-emission hybrid plug in vehicles, and deploy hybrid plug-in infrastructure. Wyandotte must dredge the navigational channel in the Detroit River to allow fuel deliveries to the City’s baseload electric plant. This project involves the deployment of 5 utility-scale wind turbines on an urban brownfield.

s t s

-N

e u

q e R

BIODIESEL FUEL TURNKEY PROCESSING,PRODUTION AND DISTRIBUTION PLANT IN THE CITY OF DETROIT. THE PLANT IS SLATED TO DEPLOY STATE OF THE ART PROCESS EQUIPMENT AND TECHNOLOGY DEVELOPED BY GERMANY BASED XENERGA CORPORATION. HIGH COFIDENCE SHOVEL READY WITHIN 120 TO 180 DAYS CONTINGENT UPON ZONING AND ENVIRONMENTAL IMPACT ASSESSMENT. PHASE 1 SHALL HAVE A MAXIMUM ANNUAL CAPACITY AT 10MIL US GALLON PER YEAR. WITH SITE EXPANDABILITY TO APPROX 30 MIL US GAL/YEAR. THE VALUE STREAM AND SUPPLY CHAIN WILL BE OPTIMIZED BY DEPLOYING EXISITING UPSTREAM AND DOWN STREAM PRIMARY ACCESS VIA RAIL CAR AND BACK UP VIA CLASS 8 TRUCKS. THE DETROIT FACILITY SHALL DEPLOY AN OPTIMIZED PLANT PROCESSING METHODOLOGY THROUGH LESSONS LEARNED FROM OUR JV PARTNER ARLINGTON ENERGY CORPORATION. THIS COUPLED WITH SUPPORT FROM OUR ENGINEERING PARTNER XENERGA. SITE SPECIFIC ENGINEERING WILL BE COMPLETE IN WITHIN THE 180 DAY TIME FRAME. 10/1/2008

5/1/2009

Funding Request

Route (Infrastructure Only)

D VE $

7,000,000

$

1,000,000

$

1,000,000

$

2,000,000

$

3,000,000

$

5,000,000

$

4,500,000

S 02262009

Submitted Requests - Not Approved

824 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bloomfield Township

Bloomfield Township

Bloomfield Township

Bloomfield Township

Project Name

Project Description

Start Date

Expected Completion Date

SquareLake Road Water Main Replacement

The water main replacement project consists of replacing the four inch diameter water main that runs along Square Lake Road with an eight inch diameter water main via. pipe bursting. This area has long been a source of constant water main breaks. Because of site constraints, which include several conflicting underground utilities including a 20” diameter transmission water main and an oil pipeline, we believe that the best option is to place the new water main in the same location as the existing water main. The existing water main will be increased to eight-inch diameter. Additionally, the proposed water main will be connected to an existing water main at the corner of Woodward Avenue and Square Lake Road to complete a loop and provide better service. Ten homes along Square Lake Road will be affected by the construction and will subsequently benefit from the improved water service. 4/1/2009

Colberry Park Water Main Replacement

The water main replacement project consists of replacing all the water main within Colberry Park Subdivision. This system was at one time a subdivision ground water well system. A majority of the water main is four-inch diameter pipe. The Township has also experienced several water main breaks in this subdivision, thereby prompting this subdivision to be selected for water main replacement. Based on the results of Phase I Square Lake Road pipe bursting, it was the Township’s intent to bid the project as either pipe bursting or open trench installation. The work will consist of replacing approximately 8,500 linear feet of water main, and will improve the water service for roughly 70 homes. 5/1/2009

Bloomfield Village Water Main Replacement

P P A

O R

Funding Request

D VE

10/1/2009

$

220,000

4/1/2010

$

1,300,000

The Bloomfield Village Subdivision water supply system is over 80 years old and is the oldest in the Township. Based upon water repair records there is significant breakage as well as a need to replace operative valves and older style hydrants. The system consists of 50,000 feet of undersized pipes (less than 6-inch diameter) and 110,000 feet of pipe larger than 6-inch diameter. Road replacement would also be included as part of project. The project would be to address the system at large in phases depending funding availability: first, replacement of all pipe less than 6 –inch, then if funding is available replace the remaining system, however if funding is not available the program would be to replace the valves and hydrants as needed. 10/1/2009

Octber 1, 2010

$

40,000,000

The Township owns nine sanitary pump stations. The stations range in age and all require different levels of maintenance and restoration. In the summer of 2008, the Township contracted with our engineering consultant to investigate the conditions of the pump stations. The results of the investigation indicated that all the stations require various levels of restoration varying from updating electrical components, replacing pump and cable lifting components, restoring the wet wells and canister structures, and even some exterior site modifications. Additionally, it was determined that the force mains serving the pump stations shall also be replaced as part of the restoration work. April 1,2009

1/1/2010

$

1,700,000

T O

s t s

-N

Route (Infrastructure Only)

e u

Bloomfield Township

Bloomfield Township

Bloomfield Township

ub

tt i m

Bloomfield Township

d e t

q e R

Sanitary Sewer Pump Station Repair Project

S 02262009

Submitted Requests - Not Approved

825 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Bloomfield Township

Bloomfield Township

Bloomfield Township

Bloomfield Township

Bloomfield Township

Bloomfield Township

Project Name

Start Date

Rehabilitate Sewers in the Bloomfield Township CSO District

In 1993, the Township performed internal sewer inspection work in the CSO district located in the southwest corner of the Township. Rehabilitation recommendations were made and several areas were identified as areas requiring future monitoring. The Township performed restoration on a portion of the recommendations at that time. However, due to funding limitations, the Township was unable to restore 20% of the total recommended. It is the Township’s intent to be proactive and reevaluate and rehabilitate the sewers in the CSO area. It is estimated that approximately 70,000 linear feet of sewer requires investigation. The project will include inspection and documentation of the sewers with the goal of identifying areas of inflow and infiltration and rehabilitation as needed. 6/1/2009

Sanitary Sewer Extensions to Mitigate Aging Septic Systems

The Township consists of over 200 miles of sanitary sewers but only serves about 80% of the population. There are approximately 3,000 homes currently on septic systems that are over 30 years old. Many of these homes are located adjacent to lakes, streams or other waterways. The cost for constructing sanitary sewers have become almost cost prohibitive by homeowners desiring to replace their aging system, Instead many homeowners have to mitigate their failing systems within costly engineered system for the short term fix. . Approximately 90 miles of sewer pipe will needed to be constructed to serve these areas. The Project would consist of extending sanitary sewers into these areas based upon the Township’s Master Sanitary Sewer Plan, developed over 30 years ago. 10/1/2009

14 Mile Road Paving

The gravel road portion of 14 Mile Road between Franklin and Inkster Road is located along the Franklin River. The erosion of the river’s embankment threatens the failure of the existing roadway surface, wastewater force main, large drinking water supply pipe and high pressure gas pipeline that are located under the roadway. The project consists of paving the road, installing storm sewers and stabilizing the embankment along the road. 5/1/2009

Bloomfield Township

Township Campus Roads

Bloomfield Township Cheboygan County Cheboygan County Cheboygan County Cheboygan County Cheboygan County Cheboygan County Cheboygan County Cheboygan County Cheboygan County

Bloomfield Township City of Cheboygan City of Mackinaw City Tuscarora Township City of Cheboygan City of Cheboygan Cheboygan County Cheboygan County Cheboygan County Topinabee

Diesel Emissions Act Wastewater Treatment Plant Wastewater Treatment Plant Sanitary sewer installation Potable water system County marina High speed internet County animal shelter County fairgrounds Streetscape improvement

b u S

tt i m

T O

s t s

d e t

q e R

780,000

Octber 1, 2010

$

120,000,000

11/1/2009

$

3,500,000

6/1/2009

10/1/2009

$

1,500,000

5/1/2009 Spring 09 Summer 09 Summer 09 Spring 09 Spring 09 Spring 09 Spring 09 Spring 09

October 1,2009

$ $ $ $ $ $ $ $ $ $

1,050,000 2,400,000 4,000,000 12,000,000 4,800,000 3,500,000 1,000,000 500,000 1,000,000 2,500,000

P P A

The Township is constructing a new senior center at its campus that also include the central fire station, DPW garage, court house and administrative offices. The aging roads that provide access to the campus are in need of replacement in order to provide safe passageway to the senior center while also maintaing access for emergency and DPW vehicles. The project will include the replacement of Andover and Exeter Roads. Replace special equipment that would qualify under the stimulus package in the area of the Diesel Emissions Act. Upgrade to capacity and quality fo effluent release Upgrade to capacity and quality of effluent release Install new sanitary sewer system Water main upgrades, additional water tower, meter replacement Complete replacement, of county marina Provide countywide available of high speed interne Build addition to county animal shelte Upgrade and replace facilities Streetscape improvement, lighting for downtown project

Route (Infrastructure Only)

D VE $

-N

Submitted Requests - Not Approved

O R

Funding Request

5/1/2010

e u

Bloomfield Township

02262009

Project Description

Expected Completion Date

826 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Hudsonville

City of Hudsonville

Project Name

Project Description

City of Hudsonville

City of Hudsonville

City of Hudsonville

City of Hudsonville

City of Rockwood

City of Rockwood

Nature Center Interpretive Center Hughes Park Concession Stand and Bathroom Retention Basin at the Waste Water Treatment Plant

City of Rockwood

City of Rockwood

Multi-use path on Huron River Drive

City of Rockwood

City of Rockwood

Multi-use path in Lezotte Park

City of Rockwood

City of Rockwood

Ditner Drive East water main replacement

City of Rockwood City of Royal Oak

City of Rockwood Royal Oak

Hazel Road reconstruction ROADS

City of Royal Oak City of Royal Oak City of Royal Oak City of Royal Oak

Royal Oak Royal Oak Royal Oak Royal Oak

ROADS ROADS ROADS ROADS

City of Royal Oak City of Royal Oak City of Royal Oak City of Royal Oak

Royal Oak Royal Oak Royal Oak Royal Oak

ROADS ROADS ROADS ROADS

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

ub

SIDEWALK

S

SIDEWALK

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

SEWER

City of Royal Oak

Royal Oak

SEWER

City of Royal Oak

Royal Oak

WATER

02262009

SEWER

O R

PP

Funding Request

6/10/2009

$

3,875,000

6/9/2009

12/9/2009

$

500,000

6/9/2009

10/9/2009

$

50,000

5/9/2009

11/9/2009

$

1,000,000

5/9/2009

6/10/2009

$

1,002,000

5/9/2009

11/9/2009

$

1,050,000

5/9/2009

11/9/2009

$

250,000

5/9/2009

11/9/2009

$ $

615,000 150,000

Washington Ave. - Mill and Resurface Lincoln to Woodward Act 51 Eligible Crooks Rd.- Mill and Resurface Main St. to Webster - Act 51 Eligible Joint Sealing - Recently Resurfaced Streets - Act 51 Eligible Mill and Resurface Asphalt Streets - Act 51 Eligible Sherman Drive - 11 Mile Rd to Forestdale - Removal Exist Pvmt. and Replace with New Concrete Pavement - Act 51 Eligible Pavement Replacement - Dept. of Public Works - Act 51 Eligible Concrete Pavement Replacement Sections 3 & 10 - Act 51 Eligible Mill and Resurface Asphalt Streets - Approx. 8 Miles - Act 51 Eligible

$ $ $ $

571,000 802,000 50,000 200,000

$ $ $ $

1,525,000 100,000 300,000 9,300,000

Pave existing Gravel Roads with New 6" Concrete Pavement Act 51 Eligible Streetscape Improvements Central Business District - Replacement of old clay brick and tree grates Streetscape Improvements Central Business District - Target Area Replacement of old clay brick and tree grates

$

6,700,000

$

1,700,000

$

300,000

$

242,500

$

350,000

$

900,300

$

762,500

To construct an interpretive center at the Hudsonville Nature Center to provide better opportunities for schools and the public to use the Nature Center as a learning tool and to better enjoy it. To construct a new concession stand and bathroom at Hughes Park, which is our community park. The current facilities are obsolete. Project consists of the construction of a second 0.5 million gallon retention basin at the Waste Water Treatment Plant on Swallow Drive. Project consists of the construction of a multi-use path along Huron River Drive between Truman Road and Fort Street. Project consists of the construction of a multi-use path along the Huron River between Swallow Dive and Fort Street.

A T

s

t s e

O N

Project consists of the removal and replacement of the existing water main between Olmstead and Candace with an 8" water main including hydrants, valves and appurtenances. Project consists of the removal and reconstruction of pavement including new base, subdrains, new concrete etc. Pavement Replacement - Dept. of Public Works - Act 51 Eligible

u q e

Funding & Shovel Crooks Road - 12 Mile Rd. to Beechwood - New 12" Relief Sewer ready Funding & Shovel Sewer Lining - Citywide - Correct Infiltration and cracks ready Funding & Shovel Woodward, Harrison, Lafayette and Washington - Relief Sewer ready Funding & Shovel 12 Mile Rd. - Marywood to Cherry - Replace existing 8" WM with New 12" Watermain ready

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

R d

e t t

t i m

ROADS

Start Date

Construct a 22,840 s.f. building addition to the Hudsonville City Hall for the Department of Public Works. Project will replace an aging facility located at a separate site housing the street, utility and park maintenance functions and replace a noncompliant salt storage facility with a new covered salt storage facility in compliance with DEQ requirements. This project will bring all of the city’s operations to a centralized location and will be a LEED Silver Certified Demonstration Project for Hudsonville. There currently are no LEED Certified buildings within the City of Hudsonville. There are also onsite flooding and stormwater problems along the Buttermilk Creek watershed that this project will address in conjunction with the onsite stormwater remediation efforts. Those efforts will provide additional retention to eliminate occasional flooding of City Hall's lower level and also delay the impact on the downstream Buttermilk Creek watershed of the upstream watershed's stormwater. Stormwater treatment will include a rain garden, retention for irrigation use, and porous pavement. 6/9/2009

DPW Facility

Expected Completion Date

Start plus 120 days Start plus 90 days Start plus 160 days Start plus 150 days

827 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description Coolidge at Woodward Ave. from West side to East side of Woodward - Replace existing 8" WM with New 12" Watermain Woodward Ave. Northbound - Trafford to 13 Mile Rd. - Replace existing 6" WM with New 12" Watermain Royal Oak High School - from Normandy to 500' south of Normandy - Replace existing 6" WM with New 8" Watermain Main St. - Vinsetta Blvd. to Webster - Replace existing 6" WM with New 12" Watermain

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

Start Date Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel Main St. - Royal to LaSalle - Replace existing 6" WM with New 12" Watermain ready Houstonia - Main St. to Rochester Rd. - Replace existing 4" WM with New 12" Funding & Shovel Watermain ready Sherman Drive - Josephine to east of Baker - New 8" Watermain to connect with Funding & Shovel existing watermains ready Sherman Drive - Maxwell to west of Maxwell - New 8" Watermain to connect with Funding & Shovel existing watermains ready Funding & Shovel Forestdale - Cambridge to Farnum - Replace existing 4" WM with New 8" Watermain ready

A T

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

WATER

Maple Ave. - Louis to Park Ave. - Replace existing 4" WM with New 8" Watermain

City of Royal Oak

Royal Oak

WATER

City of Royal Oak

Royal Oak

Install fixed Location - Radio - Water Meter Read System - Johnson Controls Royal Oak and Normandy Oaks - Improvements to irrigation system to use ground water

City of Royal Oak

Royal Oak

BUILDINGS

City of Royal Oak

Royal Oak

BUILDINGS

City of Royal Oak

Royal Oak

BUILDINGS

City of Royal Oak

Royal Oak

BUILDINGS

City of Royal Oak City of Royal Oak

Royal Oak Royal Oak

BUILDINGS LIGHTING

City of Royal Oak

Royal Oak

PARKING

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

City of Royal Oak

Royal Oak

City of Royal Oak City of Royal Oak

Royal Oak Royal Oak

BUILDINGS TRANSPORTATION

City of Saline

City of Saline, Michigan

City Hall Solar Energy

02262009

e u

st

R.O. Police Gun Range Improvements

q e R

Renovations R.O. City Hall - HVAC, Electrical and required upgrades Lindell Ice Arena - East Rink Floor and Cooling System Replacement -outside door replacement

itt

m b u PARKING

S

s

O N

PARKING

MOTOR POOL HOUSING

d e t

225 South Troy - Building Renovations - Upgrades

PP

Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready Funding & Shovel ready

Historic Orson Starr House - Roof replacement Change existing Ornamental Street Lighting to LED - over 400 lights Maheny / Meininger Community Center - Resurface Parking Lot - Correcting existing Funding & Shovel lot imperfections ready Funding & Shovel Purchase Parking Deck - Freed Project ready Funding & Shovel Parking Structures - Installation of Security Cameras ready Funding & Shovel Parking Structures - Pay in Lane Equipment (3 sites) ready Funding & Shovel Hybrid Vehicles - Purchase - Replacements of fleet vehicles (20) ready Funding & Shovel Affordable Senior Housing - Damone Project @ old Starr Sch. Site ready Funding & Shovel City Hall Finance - Upgrade Financial Computer System ready Non - Motorized Transportation Plan Install 40 kilowatt Photovoltaic System at the City Hall Building to reduce demand on electrical usage 6/9/2009

Submitted Requests - Not Approved

Funding Request

Start plus 90 days Start plus 120 days

$

64,400

$

777,300

Start plus 90 days Start plus 120 days

$

202,200

$

183,400

O R

Woodward - Lincoln to Harrison and Harrison & Lafayette to Washington - Replace existing 8" WM with New 12" Watermain & replace existing 4" WM with New 8" Watermain

PARKING

Expected Completion Date

D VE

Start plus 90 days Start plus 100 days

$

135,100

$

257,300

Start plus 90 days

$

204,900

Start plus 90 days

$

55,700

Start plus 90 days

$

110,800

Start plus 160 days

$

422,800

$

217,500

$

8,000,000

$

250,000

Start plus 90 days Start plus 540 days

$

200,000

$

20,000,000

Start plus 90 days Start plus 200 days

$

600,000

$

2,000,000

Start plus 90 days

$ $

7,300 150,000

Start plus 90 days

$

150,000

Start plus 90 days

$

3,500,000

Start plus 90 days

$

450,000

Start plus 90 days

$

550,000

Start plus 90 days Start plus 300 days

$

540,000

$

500,000

Start plus 90 days

$ $

300,000 40,000

10/9/2009

$

250,000

Start plus 90 days Start plus 480 days Start plus 200 days

Route (Infrastructure Only)

828 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City of Saline

City of Saline, Michigan

Water Treatment Iron Filters

City of Saline

City of Saline, Michigan

Backup Power Generator

City of Saline

City of Saline, Michigan

PCF Boiler

City of Saline City of Saline City of Saline

City of Saline, Michigan City of Saline, Michigan City of Saline, Michigan

PCF Sand Filter Millpond Park Pathway Recreation Center Parking Lot

City of Saline City of Saline

City of Saline, Michigan City of Saline, Michigan

Peoples Park - Lot and Pathways Brecon Park Play Area

City of Saline

City of Saline, Michigan

Millpond Pedestrian Bridge

City of Saline

City of Saline, Michigan

Rec Center Solar Energy

City of Saline

City of Saline, Michigan

Downtown Streetscape

City of Saline

City of Saline, Michigan

Farmers Market Pavilion

City of Saline

City of Saline, Michigan

Energy Conservation

City of Sterling Heights Sterling Heights

Energy Conservation & Efficiency - Roof Replacement Energy Conservation & Efficiency - HVAC, Lighting in City Buildings Energy Conservation & Efficiency/Public Safety Equipment - Generator

City of Sterling Heights Sterling Heights City of Sterling Heights Sterling Heights City of Sterling Heights Sterling Heights City of Sterling Heights Sterling Heights

Public Safety Equipment - Fire Trucks Public Safety Equipment - Mobile Data Computers

City of Sterling Heights Sterling Heights

City of Sterling Heights Sterling Heights

S

City of Sterling Heights Sterling Heights

Funding Request

11/9/2009

$

300,000

6/9/2009

11/9/2009

$

70,000

Replace deficient boiler at Wastewater Plant to improve treatment processes 6/9/2009 Replace sand filters to improve quality of discharge of treated wastewater to Saline River 6/9/2009 Extend/complete paved pathway per Linear Pathway Plan 7/9/2009 Restoration of deteriorated parking lot by bituminous resurfacing 7/9/2009 Construct paved parking lot for users; install paved pathway Linear Pathway Plan to link parks and neighborhoods 7/9/2009 Construct new play area with pavilion and pathway lin 7/9/2009 Construct pedestrian bridge and paved pathway per Linear Pathway Plan to link parks and neighborhoods 8/9/2009 Install 40 kilowatt Photovoltaic System at the Recreation Center Building to reduce demand on electrical usage 6/9/2009 Reconstruct Downtown Streetscape deteriorated sidewalks to provide safer walking surface. 9/9/2009 Construct pavilion in Downtown Parking lot for Farmers Market and community activities and festivals 9/9/2009 Identify, design, and implement sustainable energy infrastructure projects in Municipal buildings and downtown lighting ^May 09

11/9/2009

$

135,000

$ $ $

300,000 100,000 140,000

9/9/2009 10/9/2009

$ $

140,000 90,000

11/9/2009

$

350,000

10/9/2009

$

250,000

6/10/2009

$

1,900,000

6/10/2009

$

900,000

^Dec 09

$

300,000

4/9/2009

9/9/2009

$

500,000

The replacement of the 20-year old roof on the Police Station and Public Library, and the 15-year old roof on the 41-A District Court, which are falling apart and leaking, with new roofing and insulation for energy efficiency. 3/9/2009

6/9/2009

$

175,000

T O

s t s

11/9/2009 11/9/2009 9/9/2009

O R

P P A

-N

e u

q e R

Public Safety Equipment - Police 9-1-1 Computer System Public Safety Equipment - Emergency Warning Sirens Public Safety Equipment - Mass Notification System

m b u

City of Sterling Heights Sterling Heights

City of Sterling Heights Sterling Heights

itt

d e t

Start Date 6/9/2009

Energy Conservation & Efficiency - LED Lights Retro-fitting City facility parking lot lights & street lights to LED.

City of Sterling Heights Sterling Heights

City of Sterling Heights Sterling Heights

Project Description Install additional iron filters at the Water Treatment Facility to improve efficiency of producing potable drinking water. Install back-up power generator to maintain use of sanitary sewer pump station in Sauk Trail Industrial Park, at times of power outages.

Expected Completion Date

D VE

To retro-fit HVAC and lighting systems in City facilities. To install a back-up emergency generator in City Hall to continue emergency operations during black-outs. Replacement of (2) 20- & 21-year old Fire Trucks with EPA emmission upgrades to meet federal mandated emmission standards.

3/9/2009

11/9/2009

$

500,000

3/9/2009

7/9/2009

$

250,000

3/9/2009

12/9/2009

$

1,040,000

To replace (45) 8-year old Mobile Data Computers in all Police Vehicles.

3/9/2009

6/9/2009

$

300,000

6/9/2009

$

175,000

9/9/2009

$

200,000

8/9/2009

$

100,000

7/9/2009

$

60,000

6/9/2009

$

240,000

6/9/2009

$

150,000

6/9/2009

$

220,000

Replacement of 7-year old vital 9-1-1 Main Computer System used 24 hours/day in Police Dispatch, including the server, computers, and monitors. 4/9/2009 To upgrade, from analog to digital, the 20-year old outdoor Emergency Warning Sirens, which are failing and have outlived their useful life. 4/9/2009 The purchase of a Reverse 9-1-1 Mass Notification System used to notify residents of emergency circumstances through the telephone system. 5/9/2009

Public Safety Equipment - Fire Training Tower Structural repairs to the City's 19-year old fire training tower to correct mold problems, Repairs repair cracked bricks, repair windows, fix leaking roof and rusted stairwell. 3/9/2009 Road Maintenance Equipment - Street Sweeper Replacement of 13-year old Street Sweeper with new Waterless Street Sweeper. 3/9/2009 Road Maintenance Equipment - Tandem Axle Replacement of 17-year old dump truck with new Tandem Axle Dump Truck w/Snow Snow Plow Plow & Spreader to meet federal mandated emmission standards. 3/9/2009

Route (Infrastructure Only)

City of Sterling Heights City of Sterling Heights Sterling Heights

02262009

Road Maintenance Equipment - Front End Loader

Replacement of a 16-year old Front End Loader.

Submitted Requests - Not Approved

3/9/2009

829 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Sterling Heights Sterling Heights

Purchase of (9) Salt Brine Spreaders for snow plows, which will reduce the quantity of Environmental Road Maintenance Equipment -salt needed on roads and melt ice at a lower temperature, which will improve road Salt Brine Spreaders safety conditions. 4/9/2009

6/9/2009

City of Sterling Heights Sterling Heights

Sewer Maintenance Equipment Jet

Replacement of 14-year old Sewer Jet with new Sewer Jet w/Heat Box (for use in cold Sewer weather) to be used in Sanitary Sewer Cleaning Program to help prevent sewer backups. 3/9/2009

6/9/2009

City of Sterling Heights Sterling Heights

Storm Water Improvements - Storm Sewer Lift Station Pump Repairs

The replacement of (4) 35-year old storm sewer lift station pumps and electrical panels needed to prevent neighborhood flooding and improve safety conditions.

City of Sterling Heights Sterling Heights

Neighborhood Street Resurfacing (assumed not to be federal TIP dollar eligible) Sidewalk Infrastructure & Transit Improvement - Sidewalk Gap Technology & Resource Workflow Automation - Digital Document Imaging

Four miles of Neighborhood Road Resurfacing to repair potholes, cracks, and crumbling road surfaces. This will also help to increase residential property values. 4/9/2009 To complete sidewalk installation where pedestrian traffic is impeded due to gaps in the sidewalk. 4/9/2009 To digitize public records and streamline and increase document retention automation and workflow, to achieve efficiency savings. 3/9/2009

City of Sterling Heights Sterling Heights

Reimbursement to City for Partial Property Value Decline - Budget Deficit Elimination

Oriole Park Development Project - Phase 2

City of Sterling Heights Sterling Heights City of Sterling Heights Sterling Heights

City of Wyoming

City of Wyoming

City of Wyoming

City of Wyoming Clio Area Schools Clio Area Schools

City of Wyoming

02262009

D VE $

720,000

11/9/2009

$

2,500,000

11/9/2009

$

1,500,000

12/9/2009

$

450,000

Due to declining City tax base, the City will lose $20 million in tax revenue over a three year period. Seeking $4 million to reduce loss of full-time positions to continue to provide vital City services including Police, Fire, and Public Works. 3/9/2009

3/9/2009

$

4,000,000

This project is to complete phase two of the re-development of the 12.9 acre Oriole Park in a dense residential urban neighborhood. Proposals include access improvements, security and walk/bike trail lighting, walk/bike trail, shade structures, raised plaza with performance area, basketball court, and trees and native landscape plantings. Estimated project cost is $1,700,000.

7/1/2010

$

1,700,000 y

In anticipation of the growing number of older adults in our community and the changing interests of the "Baby Boomer" generation (social, mental, physical leisure and recreation opportunities), the Wyoming Senior Center must adapt to accommodate these changes. The space in which these activities are held must adapt to accommodate these changes. The existing Senior Center can be better designed to improve functional relationships and maximize opportunities to fully engage visitors. It will increase program offerings; integrate with working older adults' schedules; appeal to a larger age demographic; be better organized to keep in line with popular programs and contemporary offerings; and grow toward economic selfsufficiency. Estimated project cost is $2,600,000. 7/1/2009

8/31/2010

$

2,600,000 Yes

Jackson Park Development

Located within a densely populated urban neighborhood, immediately adjacent to middle and high schools, this 23 acre development project includes creation of wetland area, improvements to storm water control and accessibility; and construction of walking/bike trail (safe routes to school), boardwalk, security lighting, restroom facilities, playgrounds, splash pad, shade structures, parking, basketball courts, soccer fields, and tree and native vegetation planting. Estimated project cost $4,365,000. 6/1/2009

7/31/2010

$

4,365,000 y

Pinery Park Parking Lot Reconstruction Clio, Carter MS Community Education Building

The 75 acre park recieves tens of thousands of visitors each year. Drives and parking areas need to be reconstructed to improve ingress/egress, cross walk safety, and respond to strom water erosion control. 5/1/2009 Upgrade of primary electrical to building to enhance technology instruction 6/30//2009 Upgrade of primary electrical to building to enhance technology instruction 6/30//2009

November 31, 2010 9/1/2009 9/1/2009

$ $ $

tt i m

ub

S

City of Wyoming Same Same

720,000

230,000

d e t

Wyoming Senior Center Renovation

City of Wyoming

$

$

4/9/2009

A T

q e R

s

st

e u

City of Wyoming

Funding Request

Route (Infrastructure Only)

Submitted Requests - Not Approved

O R

PP

O N

7/9/2009

500,000 Yes 100,000 50,000

830 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Crystal Falls Township Crystal Falls Township Eastern Upper Chippewa, Mackinac, Peninsula Luce Counties

Project Name

Project Description

Start Date

Crystal Falls Township Townline Road Elevated Water Storage Tank

Dixon Engineering inspected the Township's existing Townline Road Tank in the fall of 1997. Also in the 2006 Nelson Tank and Engineering Co. conducted an evaluation of the tank. Both firms recommended extensive repairs be completed to the tank including riser replacement, sway rod adjustment and replacement, cleaning and painting of the interior and exterior, as well as the installation of some fall protection equipment and other safety features. In 2007 plans and specifications were completed to repair the Townline Road Tank. The repairs were to be an alternate add to the Township's Water System Improvements Project. Due to limited available funds the tank repairs were not completed. However, the tank is in need of repair and the design plans and specifications are complete. Construction may commence as soon as funding becomes available. 5/1/2009

Wireless Internet

Increase broadband internet service

Statewide Workforce Skills Census

Conduct individual skill inventory surveys of all Michigan workers; compile a census database of primary and secondary skills available among the Michigan workforce. This census will include all Michigan residents over the age of 18. Employed, unemployed, under-employed and transitioning citizens will be surveyed. Data gathered will be analyzed by industry, skill type, skill level, geographical area, age group, sex, education level, and employment status. The outcomes of conducting a skills census include: facilitating the attraction of new jobs to the state, curriculum development, skill-specific training and accelerated re-employment of unemployed or underemployed citizens. 4/1/2009

Statewide

O R

$

4,170,000

$

950,000

Utilize experienced turnaround consultants to perform Proactive Business Reviews (PBRs) for Michigan-based companies with local employment levels of 20 or more employees. Since most owners and executives are not skilled at managing companies through financial crises, they tend to have high rates of business failure. These failures result in immediate, significant job losses for the state. As these companies are failing, they are relucant to spend money on professional turnaround advisors for a variety of reasons. These include lack of confidence in external advisors, embarrasment, and lack of available cash. This program would fund proactive business reviews for "at risk" companies. The PBR process focuses management teams on cash flow stabilization. At the same time, the PBRs help management teams focus on efforts that will strengthen the company in the shortterm, then position the company for growth in the long-term. The average PBR costs $10,000. A $1MM fund will enable 100 PBRs. Associated jobs saved will likely average 30 - 60 per company, or 4,500 jobs per $1MM spent. Immediate

24 Month Program - Individual PBRs: 2-3 weeks $

2,000,000

Preliminary estimates indicate 2,000 government workers in Michigan will be laid off. This program will focus on quickly transitioning these dislocated workers to other jobs. The program will use the following key steps to assist with the transitions: 1) Identify all dislocated government workers. 2) Analyze primary, secondary and tertiary skills for each individual. 3) Match these individuals to available openings 4) If matches aren't found, identify a career transition path and coordinate necessary training. 5) Work with re-trained workforce to find new employment. 4/1/2009

24 Months

1,700,000

s

t s e

O N

8/1/2009

Route (Infrastructure Only)

D VE 250,000

PP

6/1/2010

Funding Request

$

A T

Educational Data Systems, Inc.

Expected Completion Date

u q e

Educational Data Systems, Inc.

Educational Data Systems, Inc.

Statewide

Statewide

02262009

R d

e t tt

Employer-Based Layoff Aversion Program

i m

b u S

Rapid Response Program for Dislocated Government Workers

Submitted Requests - Not Approved

$

831 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Educational Data Systems, Inc.

Educational Data Systems, Inc.

Project Name

Project Description

Start Date

Utilize existing training programs focused on executives, key managers and shareholders. The programs are: 1) Surviving Severe Economic Downturns 2) Diversifying Your Business. Training will be provided free to Michigan-based companies. Training will be presented in one of two ways. First, group workshops conducted at the county level in conjunction with county economic development personnel. Second, workshops will be conducted at company worksites for larger companies. Pilots for Surviving Severe Economic Downturns have already been conducted in Livingston County. Attendee feedback has been extremely positive. Average course ratings have been above 4.5 on a 5-point scale. These workshops will be provided by proven, successful executives, not academics or trainers. Outcomes include: lower business failure rates, lower job losses and increased Rapid Response Executive Training Program business diversification within the state.

Statewide

T O

O R

P P A Immediate

This program is designed to accelerate alternative energy job growth in the State of Michigan. It begins by analyzing key alternative energy jobs, including, conducting specific job task analysis. Next, Michigan workers are assessed for alternative energy job readiness. Individual skills analyses, as well as an aggregate skills gap analysis are compiled. Customized training plans are created; training is implemented through community colleges and vocational/technical schools. At course completion, certification is awarded and job matching and placement occurs. This program also provides economic development personnel the ability to showcase the state's available/capable workforce. Immediate

-N

Statewide

Alternative Energy Workforce Development Program

Statewide Emmett County

This Non-Custodial Parent Placement & Retention Program for the State of Michigan will serve a minimum of 1,000 previously unemployed Non-Custodial Parents, placing and retaining the individuals in unsubsidized employment in growth industries. It is a replication of a successful project currently being implemented in the State of Pennsylvania. Extraordinary outcomes are documented, processes and procedures are identified and the program is “Shovel Ready” for implementation. Program activities include: Collaboration with County Government and Courts, Assessment, Job Development, Job Readiness Preparation, Job Search Assistance, Placement in Unsubsidized Employment, Retention and Case Management. In our experience, the number of Ex-Offenders currently owing child support payments can reach as high as 80 percent of the program enrollees. Historically, a 10:1 Return on Investment is realized in Non-Custodial Parent programs. For every dollar invested, 10 dollars is Statewide Non-Custodial Parent Placement & returned to the State in child support payments. After the initial two-year funding Retention Program period, the money from child support payments can sustain the program going forward4/1/2009 High speed internet Increase high speed internet

s t s

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

24 Month Program $

250,000

12 Month program $

500,000

e u

Educational Data Systems, Inc. Emmett County

Gladwin Co. Drain Commissioner

Sage Twp. Gladwin County

u S 02262009

bm

it

d e tt

Chappel Dam-Wiggins Lake Improvements

q e R

The proposed project involves improvements to the existing Chappel Dam which is almost 100 years old. The dam consists of an earth embankment, fixed crest spillway, tainter gate and a powerhouse. The existing earth embankment has a downstream as soon as slope of 2H possible

Submitted Requests - Not Approved

2 years

$ $

2,500,000 890,000

winter 2009

$

2,660,000

832 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Hurley Medical Center Flint

Project Name

Project Description

Start Date

Community Partners Involved in Healthcare Outcomes (CPIHO)

Hurley Medical Center will establish a partnership with the Flint Community School system (i.e., Community Partners Involved in Healthcare Outcomes “CPIHO”) to increase exposure to health care careers while providing additional patient care resources to the Medical Center, resulting in decreased health care cost, length of stay, severity of injury from patient falls, and the use of restraints. Benefits from the program include community collaboration injury prevention, health promotion, and primary prevention strategies. CPIHO will increase the exposure of minority and other socioeconomically-deprived students in the Flint area to health care careers, voluntee opportunities, hands-on education, and a sense of pride in themselves and their community. CPIHO would require a coordinator responsible for scheduling students at Hurley to participate in assigned patient care activities, transportation, meal vouchers, uniforms, health screenings, and partnerships with local institutions of higher learning. Eligible students will be in grades 11-12 with an expressed interest in health care and/or community involvement. CPIHO would contain a didactic portion pr 6/1/2009

Ergonomics and Injury Prevention Nurse

A proposed mandatory state regulation, drafted to the Michigan Occupational Safety and Health Administration, would cover all employers, including hospitals and other patient care facilities, and would require hospitals to have a written ergonomics plan, to train all employees, and to “recognize ergonomic hazards” and to prove, in writing, that such training had taken place. Hurley is recommending that an “Ergonomics and Injury Prevention Nurse” position be established. This individual would develop ergonomic standards and oversee the Ergonomic Committee, as well as educate staff on ergonomics and implement methods to prevent ergonomic hazards and employee injuries. He/she would also be responsible for compiling ergonomic reports and presenting results to Risk Management and other regulatory agencies as needed. Injury prevention and the utilization of correct ergonomics will increase overall employee health and wellness while decreasing employee injuries. 7/1/2009

A T

Hurley Medical Center Flint

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

5/31/2011

$

200,000

6/30/2011

$

260,000

6/30/2009

$

150,000

O N

u q e

Research shows that people with pre-diabetes are 5 to 10 times more likely to develop type 2 diabetes and other microvascular and macrovascular complications. Diabetes is the leading cause of death and disability in the United States. It is estimated that 57 million adult Americans have pre-diabetes; 2 million Michigan adults have pre-diabetes and 68,000 Genesee County residents have pre-diabetes. Education is the key to modifying behaviors to achieve a 7% weight reduction and modest increase in activity to offset type 2 diabetes in those with pre-diabetes. Growing numbers of people in Michigan are underinsured or their health care coverage is not sufficient to meet their needs. Insurance companies do not pay for pre diabetes education or blood glucose meters and supplies. We propose to: 1) offer a 3 hour pre-diabetes class weekly with a 2-month follow-up class to support patients in their pathway to healthier lifestyles, 2) provide these individuals with a blood glucose meter starter kit, and 3) draw A1cs at the initial class and follow-up class to determine patients’ blood sugar control. These classes would be offered to other health care part5/1/2009

R d

Hurley Medical Center Flint

02262009

b u S

i m

e t tt

Pre-Diabetes Education

Submitted Requests - Not Approved

833 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Researchers estimate that 36% of Michigan adults are overweight and 27% are obese, which means a total of 63% of Michigan adults are considered to be overweight or obese. Michigan has the ninth highest adult obesity rate in the nation. Eight of the ten leading causes of death are caused by what we eat or drink, and four of five adults have chronic diseases that are affected by diet. A direct correlation can be drawn between the national rise in obesity and increased diabetes prevalence. Many Flint residents do not have access to fresh fruits and vegetables. They have no access a “grocery store,” and must rely on a convenience or corner store to buy their foods. Thus, their food choices are limited to what that particular store is able to stock Healthy foods are commodities with a short shelf-life and do not lend to “impulse” buying. In Michigan, consumption of fruits and vegetables declined between 1996 and 2007. We propose funding a vehicle and staff that would bring fresh fruits and vegetables from Flint’s Farmer’s Market to Hurley Medical Center and our community partners on a regular basis, so Flint residents have access to healthier foods. Consum6/1/2009

P P A

Hurley Medical Center Flint

Produce on Wheels

Hurley Medical Center Flint

The national obesity prevalence increased by 65% between 1995 and 2007 (from 15.9% to 26.3%). During that same time period, Michigan’s obesity prevalence rose 55% (from 18.2% to 28.2%). In the past few decades, Americans have been consuming more calories, drinking more soda and fruit juice and less milk, eating fewer vegetables and whole grains, and increasing both portion size and number of meals they eat out. A direct correlation can be drawn between the national rise in obesity and the nation’s increasing rate of diabetes prevalence. Anecdotal data based on clinical reports and regional studies show that type 2 diabetes is now more frequently diagnosed in children and adolescents along with or having an independent diagnosis of other complications (i.e. hypertension, hypercholesterolemia and other chronic disease processes), which are usually only seen in adults. Research has shown a correlation between rates of physical inactivity and obesity and a strong relationship between inactivity, type 2 diabetes, and other health problems. We would Pediatric/Family Obesity Weight Management like to offer a 10-week comprehensive weight management course for a child and the 7/1/2009

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

5/31/2010

$

300,000

6/30/2011

$

200,000

6/30/2011

$

150,000

N s

qu

d e tt

Hurley Medical Center Flint

02262009

t s e

t i m

S

ub

Smoking Cessation Program

e R

Smoking is responsible for 87% of lung cancer deaths and at least 30% of all cancer deaths and is associated with cancers of the mouth, pharynx, larynx, esophagus, pancreas, cervix, kidney, colon, and bladder. Smoking is also linked to other conditions such as colds, allergies, asthma, chronic bronchitis, emphysema, and heart disease. Children of smokers have an increased incidence of acute lower respiratory tract infections, asthma induction and exacerbation, chronic respiratory symptoms, middle ear infections, fetal retardation, SIDS, and heart disease mortality. On average, it takes six attempts to stop smoking before a person succeeds. Hurley Medical Center has at least 200 employees that smoke. A retrospective review of our insurance claims showed that asthma is one of the leading health care issues for our employees. Quitting smoking has immediate as well as long-term benefits, reducing risk for diseases caused by smoking and improving health in general for the employee as well as their family members. Several employees have asked for assistance in helping them to quit smoking. As a public health initiative, we are asking for funds to p 7/1/2009

Submitted Requests - Not Approved

834 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Hurley Medical Center Flint

Hurley Medical Center is an urban medical center that serves a high volume of uninsured indigent patients and those least likely to participate in preventive medical regimes. These patients are at highest risk to acquire healthcare-associated infections. The hospital needs to educate patients (and their families) who are infected or colonized with multi-drug resistant organisms, about healthcare-associated infection prevention strategies. This education needs to occur prior to insertion of medical devices and prior to undergoing surgical procedures consistent with WHO, CDC, and HHS priorities for Disease Prevention and healthcare cost reduction. We are requesting $100,000 in federal appropriations to provide education for patients through inpatient and outpatient educational programs (i.e., written materials, electronic/video media presentations) conducted during hospital visits. This project would also include community outreach programs aimed at infection prevention. Healthcare Associated Infections: Prevention Primary care physicians/surgeons will use educational materials for patients soon to be hospitalized for surgeries and other procedures. 4/1/2009 Education for Patients and Their Families

Hurley Medical Center Flint

Employees and physicians play a key role in the prevention of healthcare-associated infections. Hurley is requesting $100,000 in federal appropriations to provide education to employees and physicians regarding prevention of healthcare-associated infections. This would include education targeted at prevention of multi-drug resistant organisms, device-associated infections, and surgical site infections consistent with WHO, CDC, and HHS priorities for Disease Prevention and healthcare cost reduction. Funds will be used for educational programs, including written materials, electronic/video media presentations, seminars, and quality improvement initiatives. 4/1/2009

PP

O R

Funding Request

$

100,000

3/31/2011

$

100,000

Injury is the leading cause of death during the first 40 years of an individual’s life. Each year, nearly 30 million people are treated for injuries in U.S. emergency departments and account for over 35% of emergency department visits annually. The annual financial costs of injury and violence are estimated at $406 billion. Injury prevention is cost-effective. According to the Children’s Safety Network, every $46 child safety seat saves this country $140 in medical expenses, $470 in future earnings and other resource costs, and $1,300 in quality of life costs. A $33 smoke alarm purchase yields an estimated cost savings of $940. On average, a $10 bicycle helmet generates $570 in benefits to society. Hurley proposes the development of a free-standing, hospital-based, safety center located within the city of Flint to provide injury prevention training. The center would be available to community groups, schools, and churches throughout mid-Michigan to provide training on safety in the home, bicycle, pedestrian fire, water, sports, and internet, as well as motor vehicle safety. Smoke alarms, child s5/1/2009

4/30/2011

$

300,000

As many as 98,000 preventable deaths related to medical errors occur annually. It is critical that consumers become educated and involved in their healthcare. The Speak Up Ambassador program raises awareness of potential safety risk by using an acronym (SPEAK UP) to remind patients to speak up and become active participants in their care. It encourages patients to bridge the communication gap between patients and healthcare providers to help prevent medical errors. The program would employ 8 community healthcare workers, who will partner with Hurley and other community organizations to disseminate information about SPEAK UP. They will also help patients identify basic behaviors exhibited by healthcare providers that could potentially compromise patient safety. Low-income communities and areas where ethnic and health disparities are most prevalent will be targeted, because they are less likely to speak up even when they recognize the possibility for an error to occur. The knowledge and information obtained through the SPEAK UP program will help individuals, from all walks of life understand how and when to speak up and the import7/1/2009

6/30/2011

$

200,000

s

t s e

O N

Route (Infrastructure Only)

D VE

3/31/2011

A T

Healthcare-Associated Infections Prevention Education for Employees and Physicians

Expected Completion Date

u q e

Hurley Medical Center Flint

Injury Prevention

i m

b u S Hurley Medical Center Flint

02262009

e t tt

Speak UP

R d

Submitted Requests - Not Approved

835 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Hurley Medical Center Flint

Project Name

Project Description

Start Date

Childhood Obesity, Exercise, Health Management

The medical community, school-based clinics, and Hurley’s Bariatric Center of Excellence will offer programs at a minimum of three locations in the community. Each three-month program, will consist of a 45-minute dance class (e.g., ZUMBA, Wii dance) and a 1.5 hour class of fun cooking/nutrition per week for families who are interested in health and fitness. Participants can be self-referred or physician-referred, free of charge to the family. Classes will be taught by certified Health and Fitness professionals and certified dieticians. Participation will be documented for those who meet the necessary criteria for pre-bariatric surgery authorization. Each group will consist of a maximum of 15 families at a time, building a “support group” environment for pediatric obesity issues. 6/30/2009

Diabetes in Special Populations

Hurley’s Diabetes and Pregnancy program provides diabetes management and education (CDE-certified) to all patients referred to our program; however, reimbursement for our services is limited, as well as availability for staffing and space. We would like to expand on these services, replicating our current program to the patients seen at Hamilton Community Network Obstetrics and Gynecology office, housed at North Pointe Clinic. Hurley works collaboratively with Federally-Qualified Health Centers to address disparities in infant mortality, by providing Maternal Infant Health Programs and family planning services to their patients. This program will improve the health of pregnant women with diabetes by making services more accessible. By providing “one-stop shopping,” compliance with treatment will increase Ultimately, birth outcomes will improve through better diabetes management. 7/1/2009

O R 6/29/2011

Funding Request

D VE $

200,000

6/30/2011

$

474,000

We will collaborate with Genesee County Community Mental Health Services to provide on-site mental health services for patients receiving care in Hurley Obstetrics Clinic and our Maternal Fetal Medicine Clinic. We will add a psychiatrist to our obstetrics team who will be on-site, 3 days a week, during our high-risk/at-risk clinic hours. This team member will be our key resource in educating the medical community regarding psychiatric medication management during pregnancy. Hurley’s efforts with PRIDE Medical Services will be enhanced by providing educational Morbidity and Mortality Conferences, which we currently do three times per year. Medication management is key to having as healthy a pregnancy as possible and ensuring as healthy a baby as possible. This would impact the long-term expenses of a poor birth outcome by decreasing Neonatal Intensive Care Unit expenses and mental health complications for the mother. 7/1/2009

6/30/2011

$

327,400

Hurley will coordinate a lead testing initiative for patients seen in the Hurley Children’s Clinic (HCC). Approximately 14,000 patients are seen in the HCC annually. Many live in areas identified as high risk for lead exposure. Many parents do not follow-through with lead testing for their children. We will hire a Lead Testing Coordinator whose sole focus would be lead testing compliance. The coordinator would draw a sample on every patient during their visit who has not been tested in the past, follow-up on results with the physician and family, follow-up with no shows, call patients who need to come in for a lead test, and coordinate necessary appointment compliance, such as transportation issues and access. 7/1/2009

6/30/2011

$

144,800

T O

Hurley Medical Center Flint

Expected Completion Date

Route (Infrastructure Only)

P P A

N s

t s e

u q e

Hurley Medical Center Flint

Hurley Medical Center Flint

02262009

e t t

R d

Mental Health Services for Women

t i m

b u S

Lead Testing

Submitted Requests - Not Approved

836 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Hurley Medical Center Flint

Project Name

Project Description

Start Date

Expected Completion Date

Community Patient Navigator Program: Enhancing Access to Cancer Detection and Treatment for Low-Income Minority Citizens

Patient navigator programs have been used as a strategy to reduce barriers to cancer care among underserved populations. Such programs have demonstrated efficacy with colorectal and breast cancer patients (with early findings suggesting “…patient navigation is a critical component in addressing cancer disparities.” However, stringent study designs are lacking, particularly with the use of lay navigators. Hurley will collaborate with its community grassroots partner organizations to develop, implement, and evaluate a lay-navigator training program employing community minority members. These trainees will undergo three months of intense instruction. They will receive payment for this training and for their work with patients. Navigators would address key health education parameters as well as insurance, financial, and logistical issues. They may also need to address common psychological barriers such as fear or anger. Patients will be randomly assigned to one of three study arms: 1) lay navigator group; 2) nurse navigator group; or 3) team navigator group. Key outcomes of interest will include screening use, timing of diagnosis, and treatment interruptions, 7/1/2009

Family Advisory Council

Hurley Medical Center will establish a Family Advisory Council (FAC), which will consist of former patients and family members who have experienced care at Hurley. Hurley will work in partnership with patients and families on programs and projects such as hospital space/architecture, hospital operations, family issues, and patient safety.The advisory council will also include specialty councils such as women and children services, diabetes, asthma, hypertension, renal disease, and emergency and trauma services. Primary and secondary intervention strategies and access to healthcare will be a focus of FAC specialty councils. Council members will come from diverse backgrounds and bring valuable personal experience and unique professional expertise to enhance the patient and family-centered care environment model established at Hurley. Family Advisory Council members will receive transportation expenses, as necessary, and monetary compensation for their time in efforts planned. A program coordinator position will be required to act as a liaison between the FAC and Hurley. 7/1/2009

P P A

O R

Funding Request

D VE

6/30/2011

$

200,000

6/30/2011

$

150,000

Men and women with low incomes and limited education are most likely to have a cancer diagnosis at a later stage and subsequently die of this disease. Genesee County has been especially hit with loss of jobs, insurance, and resources to obtain screening tests and exams that aid in reduction of health care costs by early detection and intervention. The goal of this program would be to increase health access, education, community outreach programs and services by providing free screening and early intervention for the underserved. This plan would improve the health care environment and eliminate ethnic and racial disparities in our community. 7/1/2009

6/30/2011

$

450,000

Hurley’s Asthma Clinical Outreach Program currently serves only the pediatric population. Genesee County is the only county in Michigan that has demonstrated a decrease in asthma morbidity and mortality (according to Michigan’s asthma epidemiologist). However, Genesee County’s morbidity and mortality from asthma is still significantly higher than the state and national averages. Our goal is to expand Hurley’s program to include adults so that we will be completely family-focused. Our clinical outreach services include in-home asthma education, assessment, trigger identification and remediation, and elimination of barriers to achieve good asthma control. Our aim is to increase the family’s knowledge of asthma, decrease emergency visits, decrease hospitalizations for asthma, decrease missed school and work days, and assist patients with no limitations on physical activities. We have partnered with and continue to partner with many community agencies to reduce barriers of asthma control and to enhance the quality of life of our asthma patients. Such partnerships include public schools, daycare centers, and public health departm 7/1/2009

9/30/2010

$

600,000

T O

Route (Infrastructure Only)

N s

Hurley Medical Center Flint

Hurley Medical Center Flint

d e tt

t i m

Cancer Screening

b u S Hurley Medical Center Flint

02262009

Family Centered Asthma Clinical Outreach

t s e

qu

e R

Submitted Requests - Not Approved

837 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Hurley Medical Center Flint

Project Name

Project Description

Start Date

Expected Completion Date

Community Asthma Resource Center

Current asthma services at Hurley Medical Center are limited to Hurley patients and patients seen in the Asthma Center. We would like to expand these services to reach all Genesee, Lapeer, and Shiawasee County asthma patients. The Resource Center would be the access center for all asthma care. Hurley Medical Center is an ideal location, a safety-net hospital centrally located in the three counties. Physicians and health plans from any hospital system could refer patients to the resource center for education, evaluation, support groups, and pulmonary function testing. Patients will be directed to the appropriate asthma venue, such as sleep center, asthma clinical outreach, exercise and nutrition services, etc. Genesee County Asthma Network meetings will be held in the Resource Center. Community outreach projects such as the asthma walk, asthma summer camp, support groups, health fairs, and back-toschool with asthma events will continue to be funded and organized. Current partnerships with the American Lung Association, local universities, schools, etc. will be maintained. The Resource Center will employ a multidisciplinary team to provide s 7/1/2009

Asthma and Childhood Obesity

P P A

O R

Funding Request

D VE

6/30/2011

$

470,000

Childhood obesity and obesity-related illnesses such as type II diabetes and hypertension are increasing at an alarming rate. Hurley will start an obesity prevention obesity reduction, and health promotion program for children with asthma and their siblings and parents. The Program would be open to all primary care physicians in Genesee, Lapeer, and Shiawassee counties. Initial one-year pilot health outcomes will refine the program to better meet the needs of clientele. The program will address disparate populations and mitigating socioeconomic factors that hinder the family’s ability to meet the obese child’s needs. Program partners will include community agencies such as the Genesee County Health Department and F.A.C.E.D., as well as school principals and athletic coaches. Other partnerships will include Genesee County Community Mental Health for psychological counseling for bullying and harmfu peer pressures. Nutritional and cooking education will be part of the program. The program will consist of ongoing support and evaluation from RNs, nutritionists, social workers, counselors, fitness center staff, volunteer athletic coaches, and parents. Part 10/1/2009

9/30/2010

$

500,000

Asthma and Lead Partnership

Millions of lead-painted toys from China have been recalled. Lead is the number one environmental threat to the health of the children in the United States. The American Academy of Pediatrics estimates that 1 in 4 children live in housing with deteriorating lead paint. Most homes built before 1960, and some as recent as 1978, contain heavily leaded paint which negatively affects the human body. Lead exposure, even low levels, leads to delays in physical and mental development, lower IQ levels and cognitive function, shortened attention spans, and increased behavior problems with delayed impulse control. Approximately 90% of Flint homes were built before 1960. We propose a partnership with Hurley Medical Center and the Genesee County Health Department (since their personnel conduct home visits and on-site assessments). Assessments will require knowledge of both asthma and lead; therefore, cross training between the two organizations will be necessary. Besides the clinical component, a public health component will involve education of the general public through the media. Follow-up for the family will be pursued with referrals to physicians 10/1/2009

9/30/2010

$

420,000

Construct Airport Snow Removal Equipment Building

The existing Snow Removal Equipment Building must be relocated in order to construct new runway #7-25 and meet FAA runway safety standards.

$

3,700,000

Relocation of Landfill Materials to Permit runway construction

Runway 7-25 must be constructed to meet FAA safety requirements. This runway will cross a closed landfill area and 73,000 cubic yards of materials must be relocated to a certified landfill.

$

3,900,000

Reconstruct the main aircraft parking ramp

The asphalt in the existing main parking ramp is crumbling and in need of replacement. Portions of this ramp are unusable and recently and aircraft propellor was struck by a piece of the crumbling ashpalt

$

2,000,000

T O

Route (Infrastructure Only)

N s

Hurley Medical Center Flint

t s e

u q e

R d

i m

ub

Hurley Medical Center Flint

S

Jackson County Airport Blackman Township - Reynolds Field Jackson County

Jackson County Airport Blackman Township, - Reynolds Field Jackson County Jackson County Airport Blackman Township, - Reynolds Field Jackson County

02262009

e t tt

Submitted Requests - Not Approved

838 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Jackson County Airport Blackman Township, - Reynolds Field Jackson County

Security Fence and entrance gate security upgrades

This project would replace approximately 4250 lineal feet of security fence and 6 entry drive gates that are only 4' in height. The new fence would be either 6 feet or 10 feet tall, depending on the need and proximity to hangars, therby enhancing the security of the airport. An added benefit is to minimize the number of deer that are able to enter the airport runway system because of installation of taller fencing in remote areas of the airport. Enhancement to the aiport's gate entry security system would be included.

Kent County

Juvenile Detention - Energy Efficiency

Upgrade the boilers in the current juvenile detention facility to decrease the amount of natural gas that is utilized resulting in less cost and less impact on the environment. 6/1/2009

82 Ionia HVAC efficiencies and upgrades

Install Direct Digital Controls to the heating and cooling system (HVAC) at several county facilities including the 17th Circuit Court, Health Department, and Friend of the Court and County Prosecutor's Office to reduce cots and reduce the environmental impact. 2/1/2009

82 Ionia Energy Efficiency

Upgrade the existing pneumatic variable air volume boxes to Direct Digital Control to increase efficiencies, allowing the removal of radiant heat @ 82 Ionia, 320 Ottawa and the Health Department resulting in cost savings and a reduction in environmental impact. 2/1/2009

Kent County

Kent County

Grand Rapids

Grand Rapids

Grand Rapids

Expected Completion Date

T O

D VE $

250,000

$

550,000

1/11/2009

$

200,000

1/11/2009

$

700,000

12/31/2009

$

150,000

O R

P P A

Funding Request

9/1/2009

Kent County

Kent County

Kent County Smart Appliance Initiative

Purchase and install energy star appliances in Kent County facilities that will reduce costs and reduce the utilization of energy and reduce the environmental impact of County services. 2/1/2009

Kent County

Kent County

Kent County Transition to T-8

Upgrade lighting to high efficiency T-8 fluorescent fixtures for all Kent County Facilities. This will reduce overall costs and result in a reduced environmental impact. 2/1/2009

12/31/2009

$

200,000

Kent County Innovative Energy

Loop the domestic hot water @ the Kent County Courthouse allowing efficiencies by heating the water with condensate. This will create cost savings and result in less environmental impact. 2/1/2009

12/31/2009

$

100,000

Kent County Health Department HVAC efficiencies

Install frequency drives and motors on the Health Department HVAC air handlers to provide optimum efficiency resulting in cost savings, and reducing the environmental impact of county operations. 5/1/2009

12/31/2009

$

150,000

12/1/2009

$

560,000

12/1/2009

$

127,000

Kent County

Kent County

Grand Rapids

Grand Rapids

Kent County

Grand Rapids Township

63rd District Court Geothermal System

Kent County

Grand Rapids Township

63rd District Court Direct Digital Controls

tt i m

d e t

s t s

-N

e u

q e R

Install a geothermal heating system in the 63rd District Court. This heating system will allow the county to utilize existing environmental resources to heat/cool this building. This project will result in cost-savings and a reduced impact on the environment by utilizing available natural energy systems. 3/1/2009 Install Direct Digital Control controls on the 63rd District Court Geothermal Heating System to conserve energy and reduce environmental impact. 3/1/2009 Complete a 2.5 mile segment of the Paul Henry Thornapple trail to provide a safe alternative transportation corridor for communities south of M-6 to the Grand Rapids area. This is a part of a multi-jurisdictional trail system.

5/15/2009

12/1/2009

$

Paul Henry 1,000,000 Thornapple Trail

5/15/2009

12/1/2009

$

1,250,000 M-6 Trail

12/31/2009

$

1,000,000

Kent County

Gaines Township

Paul Henry Thornapple Trail paving

Kent County

Byron and Gaines Township

M-6 Central Connection

Complete a 2 mile central segment of this multi-jurisdictional trail to provide a safe east-west transportation corridor across Division Ave and an active railroad.

Millennium Park/Trails

Millennium Park is a public-private partnership to reclaim 1500+ acres of primarily former industrial land into a metropolitan park system. To date, more than $30 million, including more than $15 million in private funding, has been contributed or pledged to the project. The Park touches four municipalities, and includes a variety of amenities. Funds are requested to expand the 20-miles of trails and ensure linkage with other regional and local trail networks. 5/15/2009

Kent County

b u S

Walker, Grand Rapids, Wyoming, Grandville

02262009

Route (Infrastructure Only)

Submitted Requests - Not Approved

839 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Kent County

Walker, Grand Rapids, Wyoming, Grandville

Millennium Park/Amphitheatre

Construct 12,000-seat outdoor Amphitheater in Millennium Park in collaboration with Grand Rapids/Kent County Convention Arena Authority. Public Private partnerships are being sought. Facility proposed to be built utilizing "green" and sustainable technologies resulting in greater energy efficiencies. 1/1/2010

Kent County

Grand Rapids, Walker

Millennium Park Amphitheater and General Access Roadway Improvements

Extension to Wealthy Street and Reconstruction of Butterworth Road to improve access to Park.

Improve 9 miles of park roads falling into disrepair. Eight overlays of existing substandard roads including entry drives and parking areas. Install one new parking lot to meet increasing demand for trail users. 5/1/2009 Replace substandard park entry, drives, parking and sports field and associated landscaping. Install new picnic shelter. 5/15/2009

Kent County

Various county parks in Kent County, MI

Repave Park Roads and Infrastructure

Kent County

Sand Lake

Gordon Park Redevelopment

Kent County

Wyoming

Kent County

Wyoming

Kent County

1/1/2010

P P A

$

18,500,000

$

2,300,000 Interior park roads

12/1/2009

$

250,000

5/15/2010

$

225,000

Park Buildings Energy Efficiency Improvements

Upgrade park buildings and enclosed shelters throughout the county park system to significantly improve energy efficiency. Conduct energy use review of current facilities. Install/upgrade insulation, efficient furnaces, LED and compact fluorescent bulbs, on demand water heaters and other energy use modifications. 5/15/2009

5/15/2010

$

140,000

Replace five conventional gas/diesel utility vehicles within the Parks Department fleet with electric and hybrid models. Purchase three electronic personal transporters for energy efficient trail patrols. 4/15/2009

8/30/2009

$

90,000

5/1/2010

$

2,400,000

T O

s t s

-N

Alternative Fueled Parks Utility and Patrol Vehicles

Kent County

Grand Rapids

Parks Administrative Building - LEED Achieve LEED certification with new Parks Administration and Maintenance Building. Certification and Energy Efficiency Education Install displays to educate the public regarding energy efficient construction. 7/1/2009

Kent County

Rockford

Luton Park Improvements

Kent County

Cannon Township

Townsend Park Improvements

Kent County

Kent County - Cities of Walker, Grandville, and Grand Rapids

Millennium Park Environmental Remediation

Kent County

Cities of Walker, Grandville, and Grand Rapids

Millennium Park -Oil Wells

tt i m

Waters Drain

Kent County

Grand Rapids City Alpine Twp, City of Walker, Plainfield Twp.

Kent County Kent County Kent County

Spencer Twp. Byron Twp. Gaines Twp.

Black Creek Drain Knight Drain Avalon Pointe Drain

Kent County

Byron Twp.

Kent County

Bowne Twp.

Kent County

Algoma Township

02262009

O R 11/15/2009

30,000,000

450,000

Various county parks in Kent County

d e t

ub

S

12/1/2011

York Creek

Planters Row Drain Coldwater River Kent County Road Commission : Environmental Storage Clean-up Building

e u

q e R

Install new entry drive, parking, trail, pedestrian bridges and associated landscaping. 5/15/2009 Install new entry drive, parking, open shelter, trail and associated landscaping. Replace razed substandard restroom facility. 5/15/2009

12/1/2009

$

400,000

12/1/2009

$

400,000

Construct a landfill cap on an abandoned, uncapped Type III landfill to support environmental remediation and prevent pollution to surrounding areas.

8/15/2009

12/31/2010

$

1,000,000

8/15/2009

12/31/2010

$

1,000,000

4/1/2009

7/1/2009

$

750,000

York Creek: Flood protection and stream enhancement. 7/1/2009 Black Creek Intercounty Drain: Water quality project including to protect the stream from eroding and Lincoln Lake from sediment. 4/1/2010 Knight Drain: Flood protection of residential property 4/1/2010 Avalon Pointe Drain: Divert drainage to protect residential property 5/1/2009 Planters Row Drain: Construction of storm water detention pond to protect residential property 5/1/2009 Coldwater River: Improve fishery habitat and remove brush jams to maintain flow and recreational navigability of the river. 5/1/2009

11/1/2009

$

2,000,000

10/1/2010 7/1/2010 7/1/2009

$ $ $

1,500,000 250,000 20,000

7/1/2009

$

20,000

7/1/2009

$

100,000

Kent County Road Commission NC Winter Chemical Environmental Storage Building 5/9/2009

8/9/2009

$

750,000

Environmental Clean-up of oil-wells on public park land. The Waters Drain is one of the drains in Kent county that is prone to flooding residential properties in the Grand Rapids Area.

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

$

Kent County

Kent County

12/1/2011

Funding Request

12/1/2009

Trail and Bridge restoration at Palmer Park for Refurbish bridge and wetland crossing on community access/transportation trail that community access provides a public route across the park between 44th and 52nd Streets. 5/15/2009 Watershed improvements to reduce periodic flooding hazard along Buck Creek in Buck Creek Drainage Improvements Palmer Park. 8/15/2009

Various county parks in Kent County

Expected Completion Date

840 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Kent County

Kent County

Kent County

City of Grand Rapids

Grand Rapids

Project Name

Project Description

Start Date

Single Stream Recycling Facility

The current recycling system for refuse disposal in Kent County aims to reduce the amount of solid waste sent for final disposal by volume reduction techniques and by various resource conservation and resource recovery programs. To further maximize the efficiencies and to conserve resources, the Department of Public Works recently approved the construction of a $12 million single-stream recycling plant that will furthe encourage the efficient sorting and recycling of materials. 4/9/2009

Wind Energy Demonstration Project

A wind energy pilot project to promote Kent County government as an example for alternative energy innovation and conservation and a complimentary educational program for community leaders, citizens and youth. The project would be a partnership between Michigan State University Extension, Kent County, and several non-profit (and possibly for profit) community organizations. Cost includes purchase and installation of SWIFT wind turbine, cost of educational display and materials, and staff time. 6/1/2009

Rogue River watershed in Purchasing Agricultural Conservation Kent County Easements to protect water quality:

Expected Completion Date

D VE $

12,000,000

12/31/2010

$

45,000

If funded this program will create a new dimension to the Kent County Purchase of Development Rights Program. This program will allow for the purchase of conservation easements to protect water quality. The program will work in partnership with the Michigan Department of Environmental Quality with funding potential from US EPA 319 funds. The funding requested is for a pilot program. 6/1/2009

6/1/2012

$

375,000

This pilot program will further expand the impact of the Purchase of Development Rights program by allowing the Program to partner with the Grand Valley Biosolid Authority to purchase development rights on farmland that is selected for biosolid application. In effect, the land will become the infrastructure for the wastewater treatment which is an environmentally friendly process. The proposed program is a pilot program with funds potentially being sought from the Biosolid Authority.

12/31/2010

$

300,000

3/1/2011

$

250,000

T O

N s

t s e

3/10/2009

Funding Request

P P A

O R

Kent County (southern portion of county)

Purchase of Agricultural Conservation Easements as Wastewater Treatment Infrastructure:

Kent County-Grand Rapids

Building from our success of working with neighborhood business owners to make energy-saving improvements to their commercial buildings, Kent/MSU Extension will coordinate energy conservation in three neighborhoods in Grand Rapids. The focus will be on low income home owners. The three neighborhood associations will hire a person to conduct a home energy audit that will identify no-cost or low-cost measures that can be taken to reduce their utility bills. In addition, basic information will be shared with the household on how their energy consumption affects the environment. An Energy Tool Box will be created as part of this project. It will contain such energysaving items as: draft dodgers (placed in the gap under an outside door and the door jamb), CFLs, etc. The Tool Box will also contain educational information on energy conservation written in an easy-to-understand fashion. And there will be a resource list of other organizations and programs that provide other energy conservation assistance.Additionally, the Neighborhood Energy Organizers will provide follow up Grassroots Approach to Energy Conservation- visits to those home owners who had energy efficiency improvements made by the Cit3-1-09 or later

3/1/2009

Route (Infrastructure Only)

u q e

R d

Kent County

i m

b u S

02262009

e t tt

Submitted Requests - Not Approved

841 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Kent County Kent County Kent County

Grand Rapids

Grand Rapids Grand Rapids Grand Rapids

Project Name

Project Description

Kent County

Kent County

Kent County

Grand Rapids

Kent County - Medical Examiner Facility

O R 12/31/2010

$

5,600,000

Fuel Efficient Vehicle Replacement Health Department - Generator Capacity Diabetes Surveillance Program

As a part of the day-to-day routine, there are numerous county vehicles that are driven more often than others. To help reduce costs and the environmental impact of operating these vehicles, this project will fund the replacement of nine (9) Animal Control and five (5) Environmental Health Trucks and enable the purchase of to fuel efficient/alternative trucks for us by various functions of the Kent County Health Department. 4/1/2009 Add energy efficient generator capacity to Health Departmen 4/1/2009 Create diabetes surveillance program 4/1/2009

12/31/2009 12/31/2009 12/31/2009

$ $ $

560,000 150,000 275,000

Expand the Non-Custodial Parent Program (NCPP) to provide additional services or connections to services to aid non-custodial parents in obtaining the necessary assistance that they need in order to meet their child support obligations. Due to the increase in the number of unemployed and the need to obtain different skills to seek employment, the expansion of the existing program would provide an alternative to sentencing these individuals to jail for failing to pay child support. The program expansion might include mental health services, substance abuse, special training, motivation, peer support, etc. By expanding this program, the County and the courts would be working to more proactively assist non-custodial parents obtain the skills and employment necessary to meet their child support obligations and potentially offsetting the need for State assistance such as Medicaid, WIC, etc. 4/1/2009

3/31/2010

$

500,000

To comply with the federal mandate that all light fixtures must have new ballasts and bulb that do not contain Poly Chlorinated Biphenyl (PBC's) which may be harmful. Funds for this initiative will replace the old ballasts and bulbs with new ones that are PCB free and conserve energy resulting in cost savings. These fixtures are located in the Kent County Correctional Facility which operates 24 hours per day and houses approximately 1,400 inmates. 2009

2009

$

350,000

Low Flow Replacements for Jail

This project will enable the County to conserve resources by installing a low flow diaphragm for toilets at the jail. This will result in cost savings to the County by reducing the consumption of resources.

2009

$

15,000

Wind Power Turbine (100kW)

This innovative approach and demonstration project would enable the County to instal a wind powered turbine on top of a closed landfill in order to generate energy for the consumption of public entities. The project is expected to generate savings as a result of the energy that is produced. 5/9/2009

6/9/2009

$

550,000

A T

s

e t t

ub

Kent County

S

Byron Township

02262009

t i m

Ballast and Bulb Mandate

PP

O N

u q e

R d

Expand Non-Custodial Parent Program

Kent County

Funding Request

For the past 25 years, the physical operations of the Medical Examiner’s Office have been located on the campus of a private hospital in East Grand Rapids. Over the past several years, this facility has outgrown the available space and the County is recommending that the a facility be constructed on land currently owned by the County which houses the Health Department and the Kent County Sheriff's Department. The current outdated facility creates and inefficient work-flow process, limited space for autopsies, an inefficient physical lay-out and a family viewing area that does not accommodate the family needs. The proposed construction of a new medical examiner facility will greatly increase the efficiency of the medical examiners office and could potentially become a regional office for multiple counties. This facility could also be used as a teaching facility in support of the continued growth of the Grand Rapids medical schools and healthcare industry. The proposed facility is to be built utilizing "green" and sustainable technologies to reduce environmental impact and conserve resources. 4/1/2009

t s e

Kent County

Start Date

Expected Completion Date

Submitted Requests - Not Approved

2009

Route (Infrastructure Only)

D VE

842 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

S

Grand Rapids

02262009

KCCF - HVAC

This is a component of the construction of a replacement jail facility. Funds will be used to install a geothermal heating/cooling system. This will result in significant costsavings by utilizing electricity to power the heating/cooling of the facility rather than burning natural gas or another fuel to heat and or cool the facility. This has a positive impact on both the county as a result of cost-savings but also on the environment as it reduces the potential impact and demand on the environment. 2/1/2010

KCCF - Roofing

Replacement Correctional Facility - White TPO Roofing System. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

4,600,000

12/31/2011

$

185,000

KCCF Storm water Retention

Replacement Correctional Facility - Storm water Retention below grade. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

350,000

KCCF - Enhanced Commissioning

Replacement Correctional Facility - Enhanced Commissioning. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

65,000

KCCF - Geothermal System

Replacement Correctional Facility - Geothermal Field System to replace the existing energy plant. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

4,200,000

Replacement Correctional Facility - Radiant Floor Heating / Cooling System. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

2,640,000

Replacement Correctional Facility - Ozone Laundry System to replace hot water requirement in the laundry. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

150,000

KCCF - Energy efficiencies

Replacement Correctional Facility - Increase insulation to 5" for new roof construction. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

65,000

KCCF - Energy Efficiencies

Replacement Correctional Facility - Increase wall insulation. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources.

2/1/2010

12/31/2011

$

85,000

KCCF-Heat Recovery Chiller

Replacement Correctional Facility - Heat Recovery Chiller to provide reheat capacity during the summer. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources. 2/1/2010

12/31/2011

$

600,000

KCCF-Energy Recovery Chiller

Replacement Correctional Facility - Energy Recovery Chiller for domestic hot water. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources.

12/31/2011

$

360,000

d e t

itt

s t s

P P A

-N

e u

q e R

Submitted Requests - Not Approved

O R

2/1/2010

Route (Infrastructure Only)

D VE

35,000,000

T O

12/31/2011

Funding Request

$

m b u

Grand Rapids

Start Date

Kent County Correctional Facility

KCCF - Smart Appliance Initiative

Grand Rapids

Project Description

Raze and Replace existing and outdated/antiquated 520 jail beds that demonstrate safety and security concerns to staff and inmates. Replacement of this facility will enable the County to continue housing inmates at the correctional facility rather than having to declare emergency releases. This facility houses inmates that are both presentence and sentenced to one-year or less in jail. The out-dated construction materials and design of this facility lead to inefficiencies in energy and staffing resources. (This is a priority project for Kent County). 2/1/2010

KCCF - Radiant Heating/Cooling

Grand Rapids

Grand Rapids

Project Name

Expected Completion Date

843 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Kent County

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Cascade Twp/Kent County

Project Name

02262009

Start Date

Funding Request

KCCF-Low flow fixtures

Replacement Correctional Facility - Low flow fixtures. This is a component of the construction of a replacement jail and incorporating this function will reduce the environmental impact and conserve resources.

Fleet Services LEED Certified Facility

The County will replace the existing fleet services facility which is outdated, lacking in adequate space, and inefficient for servicing the County fleet. The proposed facility wi be LEED Certified which shall includes the use of alternative energy, water recycling, daylight harvesting, optimize energy management performance, indoor environmental air quality, recycled content & local materials, low flow fixtures, light pollution reduction, enhanced commissioning, construction waste management program, lowemitting materials, green housekeeping, alternative transportation & storm water retention. The construction of this facility will assist the County in reducing the use of natural resources and result in increased efficiencies as a result of the efficient and effective facility design. 7/1/2009

10/1/2010

$

4,200,000

Fleet Services White Roof

LEED Certified Fleet Services Facility - White Roof membrane. This is a component of the construction of a fleet services facility and incorporating this function will reduce the environmental impact and conserve resources. 7/1/2009

10/1/2010

$

60,000

LEED Certified Fleet Services - Daylight Harvesting

LEED Certified Fleet Services Facility - Daylight harvesting. This is a component of the construction of a fleet services facility and incorporating this function will reduce the environmental impact and conserve resources.

7/1/2009

10/1/2010

$

50,000

LEED Certified Fleet Services - Low Impact Landscaping

LEED Certified Fleet Services Facility - Low impact Landscaping. This is a component of the construction of a fleet services facility and incorporating this function will reduce the environmental impact and conserve resources. 7/1/2009

10/1/2010

$

40,000

LEED Fleet Services - Geothermal

LEED Certified Fleet Services Facility - Geothermal well system. This is a component of the construction of a fleet services facility and incorporating this function will reduce the environmental impact and conserve resources. 7/1/2009

10/1/2010

$

185,000

LEED Fleet Services - Ventilation

LEED Certified Fleet Services Facility - Increase air ventilation. This is a component o the construction of a fleet services facility and incorporating this function will reduce the environmental impact and conserve resources. 7/1/2009

10/1/2010

$

35,000

LEED Certified Fleet Services Facility - Storm water Retention. This is a component of the construction of a fleet services facility and incorporating this function will reduce the environmental impact and conserve resources. 7/1/2009

10/1/2010

$

50,000

Kent County Aeronautics

Perimeter Road Reconstruction - This project will reconstruct those portions of the Perimeter Road that have a pavement condition index rating of Poor or Very Poor as a result of our pavement analysis update. The Perimeter Road is used for the movement of operations, emergency, security, & maintenance vehicles around the airfield without having to cross an active runway. The Perimeter Road is an important part of the airport's security program as it allows for a perimeter security check to be made on an ongoing basis. Design plans are currently underway and environmental approval has been received. The project will be ready to bid in April, 2009.

$

763,000

Kent County Aeronautics - Taxiway "y"

Taxiway 'Y' Reconstruction - The current pavement condition index rating of this taxiway is Poor. This taxiway serves major corporate tenants on the airfield, including Aero Med. Daily activity on the taxiway includes business class jets. This project will provide improved access to vacant property allowing for improved development potential resulting in future job creation. Design plans have been completed, environmental approvals received, and the project is ready to go out to bid.

$

1,596,600

LEED Fleet Services - Storm water

tt i m

d e t

b u S

Cascade Twp

Project Description

Expected Completion Date

T O

N s

Submitted Requests - Not Approved

12/31/2011

O R

P P A

st

e u

q e R

2/1/2010

$

Route (Infrastructure Only)

200,000

D VE

844 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Kent County

Kent County

Kent County

Kent County

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Kent County Aeronautics - Security Bollards

Security Bollards - This project will provide improved security to the terminal building with the installation of security approved bollards along the front curb. The major threat to current building facilities is a vehicle coming through the front of the terminal. The proposed security bollards are designed to Dept. of State K4 and K12 ratings, stopping a 15,000 pound vehicle traveling at 35 or 50 MPH. The project has been endorsed by the Transportation Security Administration (TSA)). Design plans have been completed, environmental approvals received, and the project is ready to be bid.

Grand Rapids

Kent County Aeronautics - In line Baggage system

In-Line Baggage System - This project will replace the existing bag screening devices with newer more efficient units, and relocate them out of the terminal lobby. Current screening units were installed in 2002, making Gerald R. Ford International Airport(GFIA) the first airport in the country to have 100% checked baggage screening. TSA used lessons learned at GFIA to improve screening operations throughout the country. Screening units continue to occupy space in our ticketing lobby, creating long lines at ticket counters leading to more confusion for our passengers. Preliminary design is underway in cooperation with TSA.

Grand Rapids

Entrance, state road work, driveways, and parking lots

There is a need to add a turn lane on R21, provide new entrance and driveway into park, new "green" parking lots, and pedestrian pathways to facilitate the movement and flow of traffic and visitors to the Zoo and to Park.

4/10/2009

$

3,000,000 M21

Infrastructure and Exhibit Renovation

Warehouse expansion and loading dock for storage of equipment and other resources. Movement and improvement of electrical utilities from above to below ground. Needed renovation of 50 year old bear exhibit to provide shade, improved surfaces, improved educational opportunities, energy efficiencies. Also renovation of July 1, 2009 if former lion/tiger exhibits into educational activity center for visitors. funding is in hand 4/10/2009

$

3,000,000

$

1,000,000

Grand Rapids

Grand Rapids

Countywide

d e tt

t i m

Kent School Services Network

T O

s t s

q e R

P P A

-N

e u

O R

In 2004, Kent County through its Family & Children’s Coordinating Council (KCFCCC) began a community dialogue regarding appropriate ways to realign community health and human services to support student achievement through the development of a collaborative, integrated, effective and cost-efficient education and human service delivery system. In 2006 the Kent School Services Network was established to coordinate school district resources, human service resources, and health resources in order to provide on-site support that can make sure students have the necessary emotional, social, and mental resources to reach their full potential. To date, the programs have demonstrated outcomes in 9 school districts and expansion of this program would be beneficial countywide. This program costs $100,000 per school and could be implemented in up to 10 schools for a total program cost of $1,000,000.

D VE $

2,500,000

$

21,000,000

b u S 02262009

Submitted Requests - Not Approved

845 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Countywide

Project Name

Project Description

Start Date

Kent County - System of Care

The implementation of the System of Care program has the potential to reduce longterm costs to the County, the State, and the community by intergrating various services to provide the best response to the community needs. The Community Family Partnership (CFP) approach emphasizes early identification and intervention, integrated delivery of supports and services, while braiding funding, responsibility, and authority for a more seamless and culturally competent service experience for families. All Kent County children with serious emotional disturbances (SED) will benefit from the CFP, however four priority populations of children with SED will receive specific interventions: those involved with the child welfare system; the juvenile justice system at risk of out of home placement; those with co-occurring SED and substance use disorders; and those attending schools in districts with high levels of poverty and limited service availability. Implementation is $1,000,000 per year for six years.

Kent County Honor Camp

The Kent County Sheriff's Department currently operates an Honor Camp as an alternative to jail. This camp provides a structured living environment consisting of school and work for up to 60 male offenders between the ages of 17 and 23. This alternative to jail provides offenders with opportunities to work on completing their GED and focusing on their own growth and development through focus and work. Through the addition of additional security fencing the camp could be expanded to included additional offenders that would benefit from an alternative to the County Jail. 9/30/2009

Gowen

Grand Rapids

Kent County Dispatch Center Expansion

12/31/2009

$

390,000

The Kent County Sheriff's Department desires to expand its 911 dispatch center to add additional capacity in order to provide services to additional communities in Kent County. The County currently provides 911 services to several communities and the expansion of the facility would likely result in other communities benefiting from the knowledge, experience, and capacity of the trained individuals in Kent County. If expanded, the dispatch center would add additional control stations and hire additiona staff to perform the work. The project could also yield some savings to local communities as a result of the economies of scale that may be realized through expanding and adding additional resources while providing a high quality of service to preserve public safety. 1/1/2010

12/31/2010

$

350,000

The Community ReEntry Center is an alternative to jail and focuses on transitioning offenders from incarceration back into the community. The Center offers life skills programming, job training, educational opportunities. Many residents have jobs in the community while others are job searching and taking advantage of the many programs offered at the CRC. The programs are designed to encourage personal change, better decision making and the development of skills that will enable a resident to return to society in a positive productive manner. As a part of this programming, the CRC staff and inmates would benefit from having a large bus to transport inmates to work opportunities and two additional case workers that would be available to assist in screening offenders for a high risk of recidivism and providing the appropriate services to mitigate the risk that they might re-offend. In all, both of these initiatives could reduce the number of offenders that are in jail and provide them with the skills that they need to be productive members of this community. 12/1/2009

6/1/2010

$

450,000

s

i m

Kent County

b u S

Grand Rapids

02262009

O N

u q e

R d

e t tt

Community ReEntry Center

PP

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 6,000,000

t s e

Kent County

O R

Funding Request

$

A T

Kent County

Expected Completion Date

846 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kent County

Kent County

Metro Housing Partnership, Inc.

Project Name

Project Description

Start Date

Expected Completion Date

Expansion of Kent County Guardianship Program (currently a joint program of DHS and Probate Court):

Hire a Guardianship Program Coordinator, as an employee of the Probate Court, whose responsibilities would include: (1) Assist with recruitment and training of additional public guardians, to increase the number from the current 32 to at least 50; (2) Act as a liaison for public guardians with the court and other agencies and entities, to facilitate problem solving for public guardians; (3) Develop and administer a program/entity of Representative Payees for Social Security purposes, possibly in conjunction with the Servants Center, to benefit those residents who are disabled by reason of mental illness or impairment (and therefore are required by SS regulations to have a Representative Payee in order to receive their benefits), but whose impairment does not rise to the level that a guardian would be required. This Program would provide trained and reliable Rep Payees for such disabled individuals, and mee a significant need in this community. 4/1/2009

Affordable Mortgage Revolving Loan Pool Fund

P P A

O R

Funding Request

D VE

3/31/2011

$

75,000

A 2 million mortgage loan pool fund to meet the financing of homes valued at $50,000 and under. These homes need various levels of repair. Combining purchase price and rehab loans values that are less than $50,000 can be addressed through the revolving loan fund. Home values ranging from $10,000 to $50,000 to which families can qualify are unable to obtain loans from banks for various reasons, such as moderate credit scores and one of the key reasons is the loan amount being small to issue such a loan, process it and service it is not cost efficient for the banks. 3/1/2009

3/1/2010

$

2,000,000

Flint's CPA, Family Resource Center, proposal is targeted at providing critical safety net services to needy individuals and families. Goals: 1. Create a user-friendly service delivery model for families in need of state and local human services. 2. Increase efficiency of state and local services through pooling resources. 3. Promot family stability through collaborative service provision. Expected outcomes: 1. Increased academic performance. 2. Increased parental participation. 3. Decreased absenteeism and truancy. 4. Decreased student school behavior problems. Since 2004, the Flint Community Partners in Action Collaborative, a twelve (12) member agencies network, Mich. DHS., Flint Schools, City of Flint, Planned Parenthood, Comcast Cable, Kettering University, Mott College, Hurley Hosp., Career Alliance, Flint Strive, and Metro has been creating and providing opportunites for individuals and families to access needed services. Michigan's Governor Granholm established Family Resource Centers to serve as "one stop shop" for family services located within or near a neighborhood school 3/1/2009

3/1/2010

$

600,000

Flint, Michigan

The GAIN$ Business Plus project goal is to create 80 jobs within a 2 year period. The GAIN$ business plus program will deliver knowledge and resources so that people from underserved communities can develop their own "green" businesses focused on improving and addressing energy efficiencies. Through our services, Metro Housing Partnership (MHP) will assist entrepreneurs in strengthening their business, stabilize their incomes, create additional employment and contribute to the economic revitalization of our community. Long term outcomes: 80% of businesses opened by GAIN$ Business Clients will still be open three years after completing our tailored package. 2. 75% of GAIN$ Business Plus clients with open businesses will increase their income by 25% within a three yr period. MHP has fourteen years of experience providing training, technical assistance, grant and micro loans to non-profit agencies, low income and underserved entrepreneurs. GAIN$ Business Plus products include Genesee Area Investment Networks (GAIN$) the GAIN$ Individual Development Account Program, GAIN$ Foundations Planning Program, GAIN$ Growth and Opportunties (GO) business coaching program,and the L3/1/2009 Business Plus

3/1/2010

$

600,000

Montrose

Bus Purchase Program

6/1/2010

$

800,000

Flint, Michigan

T O

N s

Route (Infrastructure Only)

t s e

Metro Housing Partnership, Inc.

Flint, Michigan

u q e

R d

Flint Community Partners in Action "Family Resource Centers" Collaborative

e t tt

i m

Metro Housing Partnership, Inc. 503 S. Saginaw St., Flint, Michigan 48504 Montrose Community Schools

b u S

02262009

Upgrade aging bus fleet - Purchase 10 busses over a 2 year period

Submitted Requests - Not Approved

6/1/2009

847 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Montrose Community Schools Montrose

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Alternative Education Addition

Construction of 4 additional classrooms to our Alternative Education Facility

6/1/2009

6/1/2010

Pittsfield Twp Historical Society Pittsfield Township

Sutherland-Wilson Farm Museum

Restore 1832 Sutherland-Wilson Sesquicentennial Farm Museum consisting of 4.6 acres with seven historic buildings--house, carriage house, barn, pump house, ice house, wood shed and hog house.

April 15,2009

August 31,2009

$

500,000

Southwest Michigan Planning Commission Village of Dryden Village of Dryden Village of Dryden Village of Dryden

MI-IN Trail System (Niles-South BendMishawaka) Dryden Road Reconstruction, Ph. 1 Dryden Road Reconstruction, Ph. 2 Dryden Road Reconstruction, Ph. 3 WW Lagoon Expansion

build 8.5 miles of trail to connect a 23 mile bi-state trail system connecting Niles with South Bend and Mishawaka Road reconstruction, east side of town Road reconstruction, west side of town Downtown road reconstruction and drainage improvements Addition of 3rd Wastewater Lagoon

6/9/2009 5/1/2009 7/1/2009 8/16/2009 5/1/2009

11/9/2009 6/30/2009 8/15/2009 10/30/2009 10/1/2009

$ $ $ $ $

2,500,000 505,100 760,000 1,000,000 1,750,000

Village of Grass Lake

Lake Street Reconstruct

Reconstruction of a portion of South Lake Street and public parking lot to accommodate new storm water drainage, curb & gutter and control of run-off from parking lot.

4/1/2009

6/1/2009

$

150,000

Village of Ortonville

Village of Ortonville, Brandon Township

Construct a new wastewater collection system and wastewater treatment plant to service the village and adjacent township residents currently served by on-site septic systems. The village has documented issues with contamination to the Kearsley Creek and other waters surrounding the village likely from leaching septic fields/tanks. In addition, existing soil conditions and groundwater levels have not allowed for replacement fields to be permitted resulting in some homes being vacated and some businesses not being able to locate within the village or expand their existing operations. Based on a study prepared for the village in 2004, the selected alternative would be a low-pressure forcemain system connected to a treatment plant with a continuous discharge permit outletting to the Kearsley Creek. The village has obtained draft discharge permit limits that are very stringent and the proposed treatment plant will need to be capable of meeting those limits now and into the future Wastewater Collection System and Treatment The village has been proactively working on a solution to this issue for over four years reviewing potential property acquisitions and funding alternatives. Although this projecFebruary, 2010 Plant

June, 2011

$

Village of Reese

May 2009, all necessary design work and environmental reviews or could reasonably be completed, such that work on the projects could begin within 180 days of the federal government releasing funds to the state of Michigan and the project approved and fund Lagoon Improvement

Village of Reese

Summer of 2009 to be completed within the required guide lines

Village of Grass Lake

Niles City and Niles Township Dryden Dryden Dryden Dryden

T O

O R

P P A

$

Route (Infrastructure Only)

500,000

D VE

N s

02262009

t s e

R d

e t tt

i m

b u S

u q e

16,500,000 Entire Village

Green Technology Light Industrial Park Development

clean out the 23 acre lagoon system. Expand the system by one more cell. This will allow the creation of a light industrial and technology park to be developed.

within two years of start date

development of a Green Technology and Light Industrial Park

two years

Submitted Requests - Not Approved

848 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Utica: north off Auburn Road along the Clinton River (one private parcel easement obtained) to the City owned 25 acre park west of the Conrail tracks at the City's northwest border with Shelby Twp.(River Bends Park). Hike and Bike Trail

10' wide, bituminous, supported with appropriate base materials, park furniture spaced as needed, wayfinding signage, wildlife indicators, river viewing platforms, approximately 1.7 miles in length

City of Utica

City of Utica

repair and rebuild of cement roadway and curbs, turning lanes, crossovers, TIP project slated for 2011, but currently engineered

DTE Energy

Smart devices and SCADA (Supervisory Control and Data Acquisition) are the prelude to Smart Grid. Two way communication and control with an expanded number of smart devices on our electrical system will improve reliability in the form of reduced frequen

DTE Energy

Current equipment with multiple boiler and turbine controls limit the efficient operation of the unit and contribute to unit Fossil Generation DCS at Greenwood Energy unreliability. Center

City of Utica

A T

Northpointe Boulevard rebuild

s

t s e

Expected Completion Date

O R

Funding Request

$

from Auburn Road just east of the Clinton River Bridge north along the Clinton River through to the River Bends Park (Shelby Twp.)at the City of Utica's 500,000 border

$

North off M-59 to terminus at 700,000 Schoenherr Road

D VE

PP

Route (Infrastructure Only)

O N

qu

DTE Energy Service Territory

90 days after funding

$

23,800,000 N/A

Kenockee

30 days after funding

$

12,800,000 N/A

DTE Energy

Current Condenser equipment limits the efficiency of the operating units and impacts Fossil Generation St. Clair Power Plant customer affordability. Condenser Replacement

DTE Service Territory

30 days after funding

$

5,400,000 N/A

DTE Energy

Installation of the Hydrojet water cleaning devices will result in increased efficiency of the units and the ability to burn lower emissions fuels. Fossil Generation Power Plants Hydro Jets

DTE Service Territory

30 days after funding

$

28,800,000 N/A

Smart Switch/ SCADA

tt i m

d e t

e R

b u S

02262009

Submitted Requests - Not Approved

849 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

DTE Energy

A new smart house / EV demonstration project (at The Henry Ford site) sponsored by DTE and Ford Motor Company incorporating an electric vehicle interface, solar, smart appliances all controlled by AMI communication applications. The project will promote The Henry Ford Smart House w/EV

DTE Energy

DTE Energy proposes building an $11 million facility to capture mediumBtu waste gas that is a byproduct of a DTE Energy Services-owned a coke battery on Zug Island. Currently, the "excess" gas is flared. Michigan's Renewable Waste Gas reclamation at Zug Island coke Portfolio Standard (RPS) battery

DTE Energy

DTE Biomass Energy is developing a 3.4 megawatt (MW) landfill gas project in southeastern Michigan. The $5.5 million project will capture the methane released from the landfill and fire it in internal combustion engines to produce the electricity. Const

Project Description

Expected Completion Date

Start Date

DTE Service Territory

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE

6/1/2009

$

450,000 N/A

Detroit, MI

30 days after funding

$

11,000,000 n/a

Michigan (exact location confidential)

30 days after funding

$

5,500,000 n/a

DTE Energy

Full implementation of the Coal Analyzer/Fuel Tracking Program, will improve system reliability and reduce fleet Fossil Generation Power Plants Coal Analyzer environmental impact. / Sampler

DTE Service Territory

30 days after funding

$

3,700,000 N/A

DTE Energy

Install reengineered Air heater components to improve system reliability, resulting in further reductions in fleet emissions and Fossil Generation Power Plants Air Heater environmental impact. Improvements

DTE Service Territory

30 days after funding

$

11,700,000 N/A

T O

st

e u

d e t

q e R

N s

Landfill gas development thru DTE Biomass (SE MI based opportunity)

tt i m

ub

S

02262009

Submitted Requests - Not Approved

850 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

DTE Energy

Detroit Edison proposes an intensive program to remove dead ash trees in the vicinity of its power lines. The emerald ash borer has killed thousands of mature ash trees in Southeastern Michigan. Due to the state’s struggling economy, many property owner Ash Tree removal program

DTE Energy

Purchase and installation of required hardware and software packages to increase system reliability during generation system upsets. These projects will support the reliability Fossil Generation Black Out Mitigation of the grid. Projects

DTE Energy

Install new or enhance existing site perimeter and internal fencing as needed to restricted unauthorized access. Locate other security infrastructure as required to monitor and control both vehicular and pedestrian access. Install or enhance existing road Fossil Generation Power Plants Site Security

Start Date

A T

t s e

O N

O R

PP

DTE Service Territory

s

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

30 days after funding is received $

20,000,000 N/A

DTE Service Territory

30 days after funding

$

1,700,000 N/A

Monroe

30 days after funding

$

4,700,000 N/A

DTE Service Territory

30 days after funding is received $

1,600,000 N/A

$

55,000,000 NA

$

45,000,000 NA

u q e

R d

e t tt

i m

Currently, the purpose of the curriculum is to give the NEW employees an orientation and basic knowledge of the job classification they were hired to fill. WE would see significant value to having these curricula run with "pre-employed" students Lineman, and power plant apprentice DTE Energy that have (Operator or Maintenance) training program Presque Isle Electric & System upgrades and reliability - Cast Iron Gas Cooperative MI Lines Replacement Presque Isle Electric & Gas Cooperative MI System upgrades - utility service extension

b u S

02262009

A project that replaces poor performing cast iron pipe with plastic pipe to improve local gas service reliability. A project to extend customer access to utility service by funding gas and electric line extensions, primarily in rural areas.

Submitted Requests - Not Approved

851 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Presque Isle Electric & Gas Cooperative MI Presque Isle Electric & Gas Cooperative MI Presque Isle Electric & Gas Cooperative MI

Location City or Township

Energy Efficiency - Transformer Upgrade Project support - Utility Facility Relocation Reimbursement

Project Description First-phase of a mult-year project to phase out mercury vapor lamps -required by federal regulations. Replace electric distribution transformers with higher efficiency units in compliance with federal guidelines. Provide funding for relocation of utility facilities required by stimulus-funded infrastructure projects of MDOT and local government.

Net Metering - Interconnection Cost Reimbursement

A project to reimburse the utility interconnection cost for generator projects, lessen the financial burden on ratepayers, and further support energy optimization initiatives.

Presque Isle Electric & Gas Cooperative MI

Economic development and reliability support for large customer projects

A project focused on redundant electric service applications for large customers with sensitive loads to reduce service interruptions, product delivery commitments and facilitate competitive “just-in-time” operations. (Includes redundant distribution facilities, UPS, generation, etc). This project would also support rooftop solar application at large manufacturing facilities.

Presque Isle Electric & Gas Cooperative Presque Isle Electric & Gas Cooperative Presque Isle Electric & Gas Cooperative Presque Isle Electric & Gas Cooperative

Provide funding for low-income customer energy efficiency outreach projects Energy Efficiency - Low-Income Customer facilitated through qualified agencies, including multi-family housing efficiency and Outreach weatherization. Energy efficiency - support customer Provide funding to assist customers who elect self directed energy optimization payments programs under Michigan's new energy laws to reduce costs. A project to fund loan guarantees for energy optimization projects through the new Energy efficiency - "Michigan Saves" Michigan Saves program. Energy efficiency and infrastructure - PHEV & A project to purchase and pilot PHEVs in conjunction with the PHEV MIEEG and study being conducted by DTE. Distributed Generation Pilot

Presque Isle Electric & Gas Cooperative MI

Project Name Energy Efficiency - Mercury Vapor Light Replacement

T O

MI MI MI MI

s t s

P P A

-N

q e R

40,000,000 NA

$

55,000,000 NA

$

15,000,000 NA

D VE

Presque Isle Electric & Gas Cooperative MI

A collaborative pilot with EPRI and other US utilities to determine the potential to improve efficiency on the grid though lowering system losses. Include circuit Energy efficiency - Green Circuit Collaborative automation and distributed generation in the pilot.

Presque Isle Electric & Gas Cooperative MI Presque Isle Electric & Gas Cooperative MI Presque Isle Electric & Gas Cooperative MI

A Distribution Automation with “Self-Healing” technology, whereby deploying Infrastructure and reliability - Distribution distribution automation in distribution systems on a prioritized basis with analysis of Automation Pilot long-term potential. Green energy - Distributed Generation Support for small distributed generation projects including solar, wind, and biomass; Projects small wind farms and anaerobic digester projects Green energy - Advanced Renewable Tariffs Funding for residential & small commercial renewable energy projects through Funding Advanced Renewable Tariffs (feed-in-tariffs).

d e tt

t i m

S

ub

Green energy - Energy Optimization and Renewable Energy Surcharges

Infrastructure support for biofuels Electric system grid improvements

Provide funding for Michigan's Energy Optimization and Renewable Energy plans under new legislation, replacing the utility surcharges and thus easing the burden on customers. Loan guarantee for new rural biofuels projects requiring electric transmission and distribution facilities. Underwater interconnection to Ontario system across St. Mary River to improve grid reliability and wholesale market.

Submitted Requests - Not Approved

NA

NA

$

55,000,000 NA NA NA

$

12,000,000 NA

NA

Create an industry interoperability prototype demonstration center dealing with AMI, Smart Grid, systems development and interface validation. Employees would explain the regulatory, legislative, technical, safety, systems and process implications of these systems.

AMI/Smart Grid Demonstration Center

Route (Infrastructure Only)

$

e u

Presque Isle Electric & Gas Cooperative MI

02262009

O R

Funding Request

A project to attract AMI meter and/or LED manufacturers to Michigan, utilizing available manufacturing space. Most AMI meter vendors still do not have mass production capability. Their limited production capabilities continue to challenge utilities working to pilot/implement AMI. Locating these facilities in Michigan (versus other countries/states) could utilize vacant manufacturing space, re-employ highly Economic development - attracting AMI Meter trained manufacturing employees and help expedite AMI implementations across the & LED Manufacturers to Michigan country.

Presque Isle Electric & Gas Cooperative MI

Presque Isle Electric & Gas Cooperative MI Presque Isle Electric & Gas Cooperative MI Presque Isle Electric & Gas Cooperative MI-Canada

Start Date

Expected Completion Date

NA

$

7,200,000 NA

$

25,000,000 NA

$

465,000,000 NA

$

35,000,000 NA

NA

852 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Presque Isle Electric & Gas Cooperative MI

DTE Energy

DTE Energy Service Territory

Project Name

Project Description

Start Date

Expected Completion Date

Distribution Infrastructure Census

Inventory and assessment of Electric Distribution using Field Survey and Aerial Pictometry for the purpose of creating complete GIS records of assets to be used in infrastructure asset management. The this would be a "substation to the meter" assessment and information captured would include asset type, location, connectivity, third party attachments and general condition.

AMI/ Smart Grid

Advanced Metering Infrastructure (AMI) Detroit Edison plans to install a comprehensive and highly flexible AMI system. The AMI system will provide bidirectional communication with every consumer’s meter for advanced data collection and load control. AMI is the foundational component of for the Smart Grid within DTE Energy’s service territory. AMI will provide customers with real-time information about their energy usage leading to wiser energy use and efficiency, more accurate monthly meter reads, and automatically alerting the utility about power outages at the customer location facilitating service restoration efforts. Every electric meter will have the capability to communicate with other load control and communication devices within the customers premise or on the distribution network. The DTE Energy AMI system is much more than a reading system, it is a two-way meter communication system that enables: meter reading, outage monitoring and response, power quality monitoring, Remote disconnect / reconnect, System load management and 30 days after distribution asset optimization and design. funding

AMI/ Smart Home

Funding Request

Route (Infrastructure Only)

D VE $

45,000,000 NA

54 months

$

7,600,000 N/A

This initiative will enable DTE Energy to offer it customers energy management and demand response options. This new generation of behind-the-meter technologies supported by AMI can promote changes in customer usage behavior. DTE Energy intends to test the value and cost effectiveness of AMI, smart thermostats and home networks when used in conjunction with time-of-use (TOU) and critical-period-pricing (CPP) rates to change customer behavior in response to the available data (demand response signals). DTE Energy will also test the effect and changes in customer behavior resulting from customer education. DTE Energy will be able to calculate changes in customer load research statistics as a function of the TOU and CPP rate changes. DTE Energy is in its first phase of automating 10,000 metering points with AMI in Grosse Ile, MI. The number of customers in these pilot programs is projected 90 days after to be 500,000. funding

54 months

$

271,300,000 N/A

Pilot partnership with Whirlpool Corporation, who has developed the Smart Appliances and will provide Research and Development expertise, this pilot will provide insight into how residential customers might adjust their individual appliance usage based on changes in price to take advantage of lower prices and reduce their electric bill. Additionally, the pilot will test whether automated control technology can allow customers to pre-program appliance response to varying price levels to integrate with customers’ lifestyles in a non-intrusive manner while reducing peak period load and lowering customer energy costs. Appliances, such as a clothes dryer, can be programmed to an ‘economy’ setting which will take advantage of low price periods. Price information will be provided by a home information gateway. Smart Appliances will be installed in residential homes and customers will be educated on how to program them to take advantage of low-price electric power. Customers will have the 90 days after option to override their pre-programmed settings. funding

24 months

$

1,100,000 N/A

T O

O R

P P A

N s

t s e

DTE Energy

DTE Energy Service Territory

u q e

e t t

R d

t i m

DTE Energy

b u S

DTE Energy Service Territory

02262009

AMI/ Smart Appliance

Submitted Requests - Not Approved

853 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DTE Energy

Service Territory

Project Name

Project Description

Start Date

AMI/Meter Moveout

Associated with the deployment of new Advanced Metering Infrastructure (AMI), DTE Energy proposes accelerating its program to move gas meters currently located inside customer homes to outside the home. The project will 1) improve safety by eliminating potential migration of gas into homes through below-grade service line connections, reduce gas pressure within the home, and eliminate the need for regulator vents lines to the outside of the home, 2) make the facilities compliant with current regulations for new construction, 3) improve customer service by not requiring the customer to be home to allow utility employees access to maintain and repair equipment and to get meter reads to assure accurate billing for service, 4) reduce customer costs in low-income areas by renewing the infrastructure without having to seek reimbursement through rate increases, 5) reduce long term maintenance costs, 6) increase jobs. This project is projected to replace approximately 50,000 natural 30 days after gas meters and associated fuel lines. funding

LED Streetlight Replacement Program

DTE Energy proposes replacing the 100,000 mercury-vapor (MV) street lights (on public roadways) and outdoor protective lights, or OPLs, (on private property) that it owns and operates with light-emitting diode (LED) lights. This represents roughly 50% of the company's total streetlight and OPL fleet, which is a much higher exposure to MV technology than the national average. The MV technology, which wa widely installed between 1960 and 1980, is not energy efficient, experiences frequent outages due to short lamp life, and require special handling because of their hazardous material content. The replacement of MV lights with LED lights will improve energy efficiency, increase reliability, and improve public safety. A suitable LED replacement product currently exists for approximately 80% of our MV lights, and a replacement for the remaining 20% is expected by the first quarter 2010. Total project cost would be $116.5 million and would require a period of 36 months to implement. The project costs represent a 50/50 split between labor and materials. 30 days after Field construction can start approximately three months after approval. Calculated en funding

EO initiatives for municipal, instructional, federal, educational, water department DHS, VA buildings

Incentives and grants, for energy efficiency improvement projects at institutional buildings. Many of these facilities were constructed 25+ years ago and could use an upgrade. Training for workers and staff to identify opportunities and implement cost effective projects. Detroit Edison and MichCon EO Programs (C&I New Construction, Custom Prescriptive, New Construction and Pilot) 6/1/2009

DTE Energy

DTE Energy

DTE Energy

O R

Funding Request

Route (Infrastructure Only)

D VE

PP

$

532,000,000

+24 months

$

116,500,000 N/A

+24 months

$

49,000,000 N/A

DTE Energy Service Territory

Provide energy partnership in-house engineers and experts at customer facilities to identify energy saving opportunities and implement projects for saving. Create a source for project financing. Customer benefits include energy auditing services that would be paid for with stimulus funds. Energy savings would be realized by customers who normally would not implement energy saving ideas. Customers could End Use Customer EE (Expanding the Energy relinquish their energy responsibilities to DTE energy managers who would help them Partnership participate in the energy optimization program. 6/1/2009

30 Months

$

29,000,000 N/A

DTE Energy Service Territory

Based on standards provide programs, training, incentives/penalties for home owners to improve energy efficiency in existing homes. The program should include insulation window and door replacement, programmable thermostats, etc. Use the Osborn Energy Savers project and Habitat for Humanity as pilot projects to model the use of energy efficient technologies in Low Income communities. Create funding sources for implementation. Detroit Edison and MichCon Programs (Residential/Small Bus Energy Star, Educational, HVAC, Low Income, New Construction, Multi Family and Pilot Programs) 6/1/2009

30 Months

$

93,500,000 N/A

A T

DTE Energy

Expected Completion Date

Detroit Edison Service Territory

DTE Service Territory

s

u q e

R d

e t t

t i m

b u S

02262009

t s e

O N

Every House/Michigan project (EE, weatherization); Expansion of Osborn program

Submitted Requests - Not Approved

854 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DTE Energy

DTE Energy

DTE Energy

DTE Energy

DTE Energy

DTE Energy Service Territory

DTE Energy Service Territory

Detroit Edison Service Territory

Detroit Edison Service Territory

Detroit Edison Service Territory

Project Name

Project Description

Green Circuits Proposal

The Green Circuits proposal is designed to increase circuit efficiency by evaluating loss-reduction approaches, improving efficiency as much as is economically feasible. This project will improve energy efficiency by reducing line losses on the distribution 90 days after circuit. funding

Green Energy Growth Proposal

The Green Energy Growth project would include the deployment of an optimal mix of renewable energy in the form of wind and solar generation, energy storage technologies (i.e. batteries), energy efficiency strategies, and demand response tactics utilizing advanced metering infrastructure (AMI) with the goal of improving loca access to renewable resources and improved energy efficiency. We will target residential and small commercial customers in our service territory for the installation of renewable energy generation. Integration of energy storage technologies will be 90 days after carried out in the renewable energy mix. funding

Pilot Wind Projects for Michigan Suppliers

DTE Energy is seeking grants to purchase two 1.5 MW wind turbines from Global Wind Systems (GWS) or another similar supplier in order to validate that the supply chain can deliver a reliable product that could be used on a larger scale. Several Michigan companies, such as GWS, are attempting to transform unused automotive supply manufacturing capacity into a Michigan-based wind turbine industry. MEDC recently awarded GWS nearly $9 million in tax and training incentives to support this effort. While such firms often license proven technology for the wind turbine design (in GWS's case, the technology comes from Tembra, a Berlin-based company), the supply chain, which consists of roughly ten main suppliers and hundreds of secondary 90 days after suppliers, needs to be validated. funding

Thumb-Area Distribution System Upgrade

Bringing 150 MW of wind farm generation in Michigan’s Thumb onto the grid will require improvements to Detroit Edison’s distribution system in the Thumb. Improvements will involve re-conductoring portions of the system and can be done quickly given the existing infrastructure, rights-of-way, etc.

1,000,000 N/A

36 months

$

2,500,000 N/A

24 months

$

5,000,000 N/A

90 days after funding

12 months

$

31,000,000 N/A

DTE Energy proposes the development of a large rooftop solar demonstration project (e.g., Chevy Volt production facility) on the order of ~1 megawatt (MW) would stimulate the solar value chain in Michigan and strengthen the environmental appeal (and hence market demand) of a Michigan-made automobile. To the extent that plug in hybrid vehicle (PHEV) demand is stimulated, dependence on foreign oil can be 30 days after reduced. Project is repeatable and could be duplicated at a number of sites. funding

12 months

$

6,000,000 N/A

Tire Fractionation

DTE Energy proposes partnering with a third party to construct a facility (on DTE property) to gasify tires and burn the product gas as fuel in a DTE Energy power plant Not an incineration process, the tires, instead, processed and gasified, thus avoiding both air emission concerns and landfill disposal issues. Under the terms of this project, the feedstock tires would be factory rejects or used tires from tire stores; they would not be retrieved from landfills. Planned capacity is approximately 8 million tires per year. The third party will finance construction of the facility and run day-to-day operations. DTE's capital commitment is for connecting the tire gasification facility to 30 days after the power plant. funding

12 months

12 months

$

9,300,000 N/A

15 months

$

3,300,000 N/A

T O

St. Clair, MI

N s

t s e

u q e

e t tt

b u S

DTE Energy

Trenton

Fossil Generation Power Plants RO Plants

Full implementation of the Water Treatment Upgrade Program, including the installation of environmentally friendly reverse osmosis systems will replace existing 30 days after equipment and improve system reliability, efficiency and reduce environmental impact funding

DTE Energy

DTE Service Territory

Fossil Generation Power Plants Dry Sulfur Systems

Full implementation of the Dry Sulfur systems would replace existing equipment and 30 days after improve system reliability, efficiency and reduce environmental impact. funding

02262009

Submitted Requests - Not Approved

O R

P P A

R d

Industrial Rooftop Solar Demonstration

36 months

Funding Request

Route (Infrastructure Only)

$

i m

DTE Energy

Start Date

Expected Completion Date

D VE

N/A

855 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

DTE Energy

Service Territory

Carbon Sequestration

DTE Energy

Service Territory

Carbon Sequestration

Carbon Sequestration - Over the course of 15 years, this would result in the sequestration of 1.2 million tonnes of CO2 and the incremental oil recovery of 2.1 million bbls Carbon Sequestration - Would provide 0.5 million tonnes/yr of carbon capture and storage and the incremental recovery of 30 million barrels of oil

PLD Replacement / System Upgrade

The City of Detroit Public Lighting Department (PLD) owns and maintains almost 80,000 public roadway streetlights and associated infrastructure. Outages are frequent and lengthy because of the system’s advanced age, outdated design, and history of limited maintenance. DTE Energy proposes partnering with PLD to upgrading the system. The upgrade would involve substantial rewiring, replacement of poles, luminaries, lamps, and associated controls. This would result in improved reliability, reduced maintenance cost, lower energy usage, and improved public safety and security. According to the Detroit Free Press, Mayor Ken Cockrel submitted a cost estimate of $193 million for this work to the U.S. Conference of Mayors the week of December 1, 2009. Additionally, the use of LED lights to replace existing mercury vapor (MV) lights would produce additional energy efficiency improvements. This would add an incremental cost of approximately $1,000 per MV luminaire to the above90 days after cost. (See LED Streetlight Replacement project.) funding

DTE Energy

Detroit, MI

Expected Completion Date

90 Days after funding 90 Days after funding

18 months

$

42,000,000

D VE $

400,000,000

+24 months

$

193,000,000 N/A

DTE Energy currently has ~ 190 series circuits containing 5,500 mercury vapor (MV) streetlight luminaires. DTE Energy proposes to convert these mercury vapor series circuits and streetlights to new underground multiple Light Emitting Diode (LED) streetlights. The project would produce significant improvements in energy efficiency, costs savings to municipalities and local governmental units and enhanced public safety, Installed prior to 1970, these underground-fed series circuit streetlights are found in DTE Energy’s older communities and predominately consist of 175-watt MV cobra head luminaires with some 250-watt and 400-watt luminaires. These older streetlights suffer from frequent failures, longer outage durations, and contribute to reduced safety and security in our older more vulnerable communities. Total project cost is $27.5M. This project is would take a period of 24 months to execute. Approximately 75% of the project funding, would support labor through design, engineering, and predominantly construction-related components with the funding 30 days after balance going to new street lighting conductor cabling and LED street light fixtures. U funding

24 months

$

27,500,000 N/A

MichCon has a significant amount of decades-old cast iron pipe that is susceptible to leakage, deterioration and repair. This project would replace approximately 300,000 feet per year of cast iron main and associated gas service lines. This project will 1) improve public safety by replacing old infrastructure dating back as far the 1800's by reducing potential leaks and gas migration in and around the home, 2) reduce the potential for line breaks which can occur during extremely cold weather leaving the homeowner at risk of no heat, 3) eliminate green house gas emissions associated with the leaks (Methane is a greenhouse gas 20 times more potent than carbon dioxide in terms of its impact on global warming), 4) reduce customer costs, and in particular in low income areas, by renewing the infrastructure without having to seek reimbursement through rate increases, 5) reduces long-term maintenance costs, and 30 days after 6) increase jobs. MichCon has a total of 13,200,000 feet of cast iron main and has established a prioritization system to optimize replacement. funding

TBD

$

T O

18 months

Funding Request

Route (Infrastructure Only)

O R

P P A

N s

t s e

DTE Energy

Detroit Edison Service Territory

R d

Series Circuit Streetlight Upgrade

e t tt

i m

b u S DTE Energy

Service Territory

02262009

u q e

Cast Iron Pipeline Integrity Replacement Program

Submitted Requests - Not Approved

1,100,000,000

856 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DTE Energy

DTE Energy

DTE Energy

DTE Energy

DTE Energy

DTE Energy

DTE Energy

Service Territory

Service Territory

Open

Open

Open

Start Date

Compressor Station Efficiency Upgrades

Service Abandonment

Service Abandonment program would provide MichCon an opportunity to work with communities to remove over 100,000 inactive service lines, due largely to declining population density in its service territory. These lines are predominantly in low income areas and would, if done in conjunction with urban renewal projects, support strategic redevelopment within Michigan Communities. This would also diminish risk associated with public safety, reduce potential gas emissions and create a significant 30 days after number of jobs. funding

Advance battery test center

DTE Energy proposes establishing, in partnership with automotive companies, universities and other utilities, a national laboratory to test large scale batteries. The facility would be modeled after the U.S. EPA’s vehicle fuel emissions lab. and would provide standardized testing and performance evaluation of battery cells and packs for use in the automotive industry and other applications. Such a facility would 60 days after strengthen Michigan's bid to become a focal point for this emerging technology. funding

PHEV High Penetration Infrastructure Demonstration Project

T O

TBD

P P A

O R

-N

Funding Request

Route (Infrastructure Only)

D VE $

7,000,000

TBD

6 to 12 months after start date

$

75,000,000 n/a

DTE Energy proposes a project to place 500-1,000 plug-in hybrid vehicle (PHEV) and plug-in electric vehicle (PEV) vehicles in a concentrated area and install/upgrade infrastructure (distribution circuits, homes, parking decks, parking meters) to allow recharging. Facilities in the test area would be equipped with Advanced Metering Infrastructure to permit variable billing rates based on time-of-day usage. The project would further develop Michigan's experience with and knowledge of the processes, 60 days after technologies and systems necessary to facilitate larger-scale adoption of the /PHEV. funding

6 to 12 months after start

$

110,000,000 n/a

DTE Energy proposes a project to introduce plug-in hybrid school buses to southeast Michigan's school transportation fleet, potentially paving the way for future reductions in petroleum-based school transportation. Not only would the project encompass the acquisition PHEV school buses, it would include designing and installing the required 60 days after infrastructure to charge the school buses. funding

6 to 12 months after start

$

110,000,000 n/a

Natural Gas Vehicles - Fleet and Individual Incentives in the form of rebates, grants and matching funds to provide for conversion of DTE Energy's , governmental and municipal, institutional and commercial fleet opportunities. Cost estimate includes replacement of 250 Vehicles per year at $30,000 per vehicle.

30 days after funding

TBD

$

7,500,000

Natural Gas Vehicle Infrastructure - Fleet and Individual Incentives in the form of rebates, tax incentives, grants and matching funds programs for both high pressure public, fleet and individual home owner systems. Cost estimate includes construction Natural Gas Vehicle Infrastructure - Fleet and of 5 high pressure refilling stations per year at $500,000 and installation of 250 30 days after Individual Incentives. home/slow refilling units at $5,000 each per year. funding

TBD

$

3,800,000

itt

d e t

Natural Gas Vehicles - Fleet and Individual Incentives.

m b u

S

Service Territory

Project Description

A program of Compressor Station Efficiency Upgrades would both enhance the efficiency of compressor station engines and reduce greenhouse gas emissions through the installation of low emission pre-combustion equipment, low emission rod packing, jacket water cooling system and Infrared leak detection system. Additional system optimization is achieved through a dynamic performance monitoring system installation would will require the hiring of engineers and engine analysts once 30 days after installed. funding

PHEV School Bus project

Service Territory

02262009

Project Name

Expected Completion Date

s t s

e u

q e R

Submitted Requests - Not Approved

857 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DTE Energy

DTE Energy

DTE Energy

DTE Energy

DTE Energy Service Territory

Project Name

Energy Auditor Training (ref 123, 125)

Project Description

Start Date

Expected Completion Date

Michigan will require hundreds of trained, certified energy auditors to evaluate customer homes and businesses and help customers utilize their energy purchases more effectively. DTE Energy proposes developing a training program in partnership with southeast Michigan community colleges to re-train displaced auto and manufacturing sector employees for this needed workforce. Envisioned is a training pool of ~1,000 people at local community colleges (Wayne, Monroe, Macomb, Schoolcraft, Oakland, etc.). The program, as conceived, would cover four (4) 60 days after semesters. funding

30 months

O R

Funding Request

Route (Infrastructure Only)

D VE $

2,250,000 N/A

$

1,000,000 N/A

Bad Axe, MI, or elsewhere Wind Technician Training Program

Anticipated wind farm construction in Michigan’s Thumb will create a need for trained and certified “Wind Technicians” to operate and maintain the equipment. DTE Energy proposes the creation of a two-year program at Huron Area Technical Center to meet anticipated future needs, The program could be expanded or accelerated as 30 days after necessary. Student tuition could be subsidized. funding

DTE Service Territory

Minority Business Development

This program will assist in the development of certified existing minority businesses to participate in both the energy efficiency and renewable energy programs. Business will be mentored and or trained by existing tier one suppliers selected by the local utilities to lead the energy efficiency and renewable energy programs in their service territories. This will assure that the end consumers of both gas and electric are participants in the economic growth stimulated by the energy programs. 6/1/2009

30 Months

$

54,000,000 N/A

Renewable energy jobs Program

Renewable Energy Jobs Program-Jobs program to retrain auto related workers (skilled labor force) to fill the need for workers in the renewable arena Design / Manufacturing / Construction / Maintenance.

30 months

$

3,500,000 N/A

Stage Insulation

Insulating of the West and South wall at the back of the Stage from the stage up approximately 62 feet to the underside of the roof deck, providing heat conservation. 6/1/2009

9/30/2009

$

40,000 n/a

Building Rehabilitation, Phase 1

Tuck-point brick and mortar on the North side of theatre, to the East of Lowell St. glass covered walkway. Mortar joints and louse spalling, and/or missing bricks repaired

9/30/2009

$

10,000 n/a

9/30/2009

$

10,000 n/a

9/30/2009

$

30,000 n/a

9/30/2009

$

5,000 n/a

9/30/2009

$

32,000 n/a

DTE Energy Service Territory

Ironwood Theatre, Inc. City of Ironwood

Ironwood Theatre, Inc. City of Ironwood

Ironwood Theatre, Inc. City of Ironwood

Building Rehabilitation, Phase 2

Ironwood Theatre, Inc. City of Ironwood

Building Rehabilitation, Phase 3

Ironwood Theatre, Inc. City of Ironwood

Replacement of Rooftop Vents

Ironwood Theatre, Inc. City of Ironwood

Roof Replacement

tt i m

d e t

Ironwood Theatre, Inc. City of Ironwood

Ironwood Theatre, Inc. City of Ironwood

02262009

q e R

60 days after funding

6/1/2009

The top 3 to 4 feet at the very top of the South wall (alley wall) should also be addressed as the mortar joints are deteriorated and in need of tuck-pointing to provide safety from collapse. 6/1/2009 The above specific areas are only part of the major deterioration of the exterior of the building. The remainder of the building must be addressed. 6/1/2009 Installed in 1928, the rooftop vents are corroded and deteriorated sufficiently to be in need of replacement 6/1/2009 The present Durolast Roof is out of warranty and in need of replacement and major repair. 6/1/2009

9/30/2009

$

10,000 n/a

Historic Organ Rehabilitation

9/30/2009

$

10,000 n/a

Enhance and Update Electircal System

Remove temporary lights, temporary extension cords, unused wiring, cover open junction boxes, replace original lamp holders with enclosed fixtures and energy saving lamps (24), Add 2 fluorescent fixtures in dressing room near men’s rest room, add hardware for four (4) mirror lights and add four(4) receptacles to replace extension cords. 6/1/2009

9/30/2009

$

3,152 n/a

Update Inefficient Heating System

Using our present hot-water system, install a radiant heating tube system under the floor of the Auditorium. This should provide a more even and comfortable system for the theatre. 6/1/2009

9/30/2009

$

43,000 n/a

Structural Improvements

S Ironwood Theatre, Inc. City of Ironwood

e u

st

s

O N

The concrete at the Lowell St. entrance (inside doorway is deteriorating from the underside and visible from the Basement. This portion of work should be done in conjunction with the City of Ironwood’s plan to repair or replace the Lowell St. sidewalk. 6/1/2009 Install ductwork for the Barton Organ air supply fan and rebuild the entry door wall for the front sound proof wall. 6/1/2009

ub

Ironwood Theatre, Inc. City of Ironwood

A T

PP

Submitted Requests - Not Approved

858 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Walled Lake

City of Walled Lake

City of Walled Lake City of Walled Lake

City of Walled Lake City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

City of Walled Lake

Project Name

Project Description

Start Date

Implementation of improvements indentified in the 2008 Drinking Water Reliability Study to ensure the continued delivery of safe water for drinking and fire protection. Conversion of existing decorative streetlights from high pressure sodium to L.E.D. for L.E.D.Conversion of Streetlights energy efficiency. Major Road Rehabilitation Reconstruction of Major Roads as indentified by Stantec Survey Re-design and/or retrofit of current storm water infrastructure to allow for better Tri-A Storm Water Management drainage within the Tri-A subdivision and to prevent flooding. Relocation of overhead wires underground to beautify the City's business district withi Relocation of Overhead Wires to Underground the DDA. Design and implementation of streetscape improvements in the DDA district including DDA Related Streetscape the historic lakefront downtown. Hiram Sims Memorial Park Handicap Purchase and installation of handicap assessible play equipment for elementary Renovation school aged children. Creation of multiple athletic fields (on previously acquired property) to promote Field of Dreams physical activity and to attract traffic to the business community. Repair and renovation of public tennis and basketball courts in Hiram Sims Memorial Tennis/Basketball Court Renewal Park. Implementation of Water Reliability Study

Summer of 2009 Summer of 2010

O N

Funding Request

$

D VE

210,000 1,900,000

$

800,000

$

110,000

Summer of 2009 Summer of 2009

$

35,000

Summer of 2009 Summer of 2009

$

75,000

Summer of 2009 Fall of 2010

$

2,500,000

$

176,000

$

100,000

Summer of 2009 Summer of 2010

O R

Summer of 2009 TBD

PP

Summer of 2009 Summer of 2009

Route (Infrastructure Only)

735,000

$ $

A T

Construction of a public parking structure in Oakland County's only historic lakefront downtown, featuring 100 spaces to support local businesses and to provide parking for free public entertainment.

Parking Structure

Expected Completion Date

City of Walled Lake

City of Walled Lake

Foster Farm Underground Railroad Museum

City of Walled Lake

City of Walled Lake

Sidewalk Improvement Program

Repair and renovation of historic farmhouse that was part of the underground railroad into a museum to display not only Walled Lake's, but also a significant part of U.S. history. Summer of 2009 Summer of 2009 Improvement of existing and construction of new sidewalks in order to advance handicap accessibility and to promote a walkable community.

School-to-Work Skilled Trade Program

Partnering with state community colleges to train college students, and retrain people, in specialty skilled technical field of lineworkers to maintain and add to Michigan's electric infrastructure. 5/4/2007

Ongoing

NA

Community outreach program that provides professional and personal development for high school students that assists in the growth in math science, and the energy industry.

6/1/2007

Ongoing

NA

1/1/2009

2010

NA

Consumers Energy

Bay City, Midland, Lansing, Marshall

Consumers Energy

Jackson, Grand Rapids, Saginaw, Detroit

High School Options Program

Consumers Energy

Oakland; Rural to Urban MI

Meter Move-Out Program

Consumers Energy

MI

Distribution Reliability Projects

Consumers Energy

Consumers Energy

e t tt

i m

ub

MI

A project to accelerate moving 20K Medium Pressure gas meters and begin moving 20K Standard Pressure gas meters out from the inside of residential homes. A project to improve the performance of aging electric infrastructure and improve overall system reliability.

NA

A project to accelerate SAP and other AMI systems enablement work. This may help to begin mass deployment 6+ months sooner (currently set for mid 2011). If it qualifies, short term, it would create systems jobs, as well as accelerate AMI and future smart grid enablement.

NA

Advanced Metering Infrastructure (AMI) Project

A project to accelerate system enablement software development to facilitate replacement of 1.8M electric and 1.7M gas meters six months earlier than current schedule. Replacement of these meters will enable AMI and the future Smart Grid.

A project to complete one hundred and thirty four engineering audits of Michigan based manufacturing, chemical, plating, plastics, hospitals, schools, government buildings. Implementing these energy efficiency measures would require investments of approximately $7 million and would realize and estimated $2.4million in energy savings. See Attached

S Consumers Energy

MI

Energy Efficiency Audits

Consumers Energy

Wayne/Oakland

Automotive Energy Optimization

Consumers Energy

MI

02262009

eq

R d

Advanced Metering Infrastructure (AMI) Project - Pilot

MI

e u

st

s

1/1/2009

A project to improve Michigan’s automotive industry competitiveness by funding General Motors Corporation’s top prospects for energy optimization. See Attached A project to support rooftop solar application at large manufacturing facilities, such as Solar Applications for Manufacturing Facilities General Motors new "Volt" engine plant. See Attached

Submitted Requests - Not Approved

12/31/2014

NA

See Attached

NA

See Attached

NA

See Attached

NA

859 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Consumers Energy

MI

Fiber to the Substations over existing poles

Consumers Energy

MI

Urban & Rural GridNet

Project Description A project to build a fiber network to connect substations and provide the backbone for the AMI network. A project to provide a WiMax network as a third broadband option for customers in city and rural areas.

Start Date

Expected Completion Date

Funding Request

NA NA

D VE

Consumers Energy

MI

Distribution Generation Study

Consumers Energy

Saginaw

Carbon Capture

A project to utilize the findings of the Green Circuit Pilot and partner with a Michigan university to study the impacts of distributed generation on grid optimization including grid efficiency. A project to fund the installation of a carbon capture & sequestration test well at Karn Weadock.

Geologic Test Wells

Geologic Test Wells are needed at and near the Consumers Energy's fossil plants to verify conditions that Geologists expect in these areas to prepare for future carbon dioxide injection. Two to four or more test wells could be drilled after permits are obtained at the Karn Weadock and Campbell sites.

Generation Efficiency

A project to improve generation efficiency whereby reducing overall emissions and producing savings on fuel costs which could go into workforce investments.

Petoskey MI

Petoskey Water Treatment Plant Upgrade Coal Delivery Reliability

A project to further advance CMS Land's action at Bay Harbor Funding for dredging of channels, waterways for coal boat deliveries

City of Melvindale

Harman Water Main Replacement - Outer Drive to Coleman

Project consists of the removal and replacement of the existing water main between Outer Drive and Coleman with a 8" water main including hydrants, valves and appurtenances.

5/9/2009

11/9/2009

$

278,640

City of Melvindale

City of Melvindale

Project consists of the removal and replacement of the existing water main between Wood Water Main Replacement - Outer Drive Outer Drive and Coleman with a 8" water main including hydrants, valves and to Coleman appurtenances.

5/9/2009

11/9/2009

$

278,640

City of Melvindale

City of Melvindale

S. Wabash Water Main Replacement -Fisher Project consists of the removal and replacement of the existing water main between to Rialto Fisher and Rialto with a 8" water main including hydrants, valves and appurtenances. 5/9/2009

11/9/2009

$

185,760

City of Melvindale

Project consists of the removal and replacement of the existing water main between Fisher Water Main Replacement - Meginnity Meginnity and the E. Side of Dix with a 8" water main including hydrants, valves and to E. Side of Dix appurtenances. 5/9/2009

11/9/2009

$

100,620

City of Melvindale

Project consists of the removal and replacement of the existing water main between Downing Water Main Replacement - Meginnity Meginnity and the E. Side of Dix with a 8" water main including hydrants, valves and to E. Side of Dix. appurtenances. 5/9/2009

11/9/2009

$

100,620

Consumers Energy

Saginaw

Consumers Energy Consumers Energy Consumers Energy

City of Melvindale

City of Melvindale

City of Melvindale

City of Melvindale

City of Melvindale

City of Melvindale

City of Melvindale

City of Melvindale

T O

e u

q e R

City of Melvindale

City of Melvindale

Montrose Schools

Montrose

02262009

NA NA

11/9/2009

$

208,980

5/9/2009

11/9/2009

$

185,760

Project consists of the removal and replacement of the existing water main between Oakwood and Corbin with an 8" water main including hydrants, valves and appurtenances.

5/9/2009

11/9/2009

$

704,340

Project consists of the removal and replacement of the existing water main on the S. Side of Oakwood with an 12" water main including hydrants, valves and Oakwood Water Main Replacement -S. Side appurtenances. 5/9/2009

11/9/2009

$

510,840

City of Melvindale

City of Melvindale

NA

5/9/2009

Dix Water Main Replacement - E. Side from new connection on Margret (Loop) to Fisher Water Main Replacement

u S

NA

Project consists of the removal and replacement of the existing water main between the E. Side of Dix on Margret (Loop) and Fisher with an 8" water main including hydrants, valves and appurtenances.

d e t

Bloomfield Water Main Replacement - Rialto to W. Side of Dix

City of Melvindale

NA

Project consists of the removal and replacement of the existing water main between Rialto and the W. Side of Dix with an 8" water main including hydrants, valves and appurtenances.

City of Melvindale

City of Melvindale

s t s

O R

NA

P P A

-N

itt

bm

Dix Water Main Replacement- W. Side from Oakwood to Corbin

Dora Water Main Replacement- S. side of Oakwood to plastic loop at Reiley Plating Wall Street Water Main Replacement - from Outer Drive thru Lankford Park to Palmer Street Montrose Schools-Middle School Heating and Cooling Project

Project consists of the removal and replacement of the existing water main between S. side of Oakwood and the plastic loop at Reiley Plating with an 8" water main including hydrants, valves and appurtenances.

5/9/2009

11/9/2009

$

278,640

Project consists of the removal and replacement of the existing water main between Outer Drive thru Lankford Park and Palmer Street with an 8" water main including hydrants, valves and appurtenances.

5/9/2009

11/9/2009

$

325,080

New heat pumps, boilers, and a cooling tower for Kuehn-Haven Middle School

1/9/2009

5/9/2009

$

1,400,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

860 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Montrose Schools

Montrose

Montrose Schools

Montrose

Montrose Schools

Montrose

Montrose Schools

Montrose

Montrose Schools

Montrose

Project Name Project Description Montrose Schools-Carter Elementary School Heating and Cooling Project New heat pumps, boilers, and a cooling tower for Carter Elementary Middle School Construction of new High School Facility for Montrose Community Schools (original Montrose Schools-New High School facility built in the 1960's) 600 student facility Montrose Schools-Carter Elementary Construction of new Preschool Wing for Carter Elementary School Facility for Preschool Wing Montrose Community Schools (4 classroom addition) Montrose Schools-Bus Purchase Program Montrose Schools-Alternative Education Addition

Start Date

5/9/2009

$

1,400,000

6/9/2009

6/11/2009

$

25,000,000

6/9/2009

6/11/2009

$

1,000,000

Upgrade aging bus fleet - Purchase 10 busses over a 2 year period

6/9/2009

6/10/2009

$

800,000

Construction of 4 additional classrooms to our Alternative Education Facility

6/9/2009

$

500,000

6/30/2010

$

1,295,334

9/30/2009

$

19,200

12/31/2009

$

18,000

7/1/2010

$

5,164,513

1/15/2010

$

9,988,322

8/28/2009

$

222,783

Goodrich Area Schools Goodrich, MI

Goodrich Middle School

Goodrich Middle School is part of a K-12 program that serves 2,200 students. Facility needs include installation of energy manangment controls to help reduce the use of natural gas and electricity. 7/1/2009

Goodrich Area Schools Goodrich, MI

Goodrich Oaktree Elementary

Goodrich Oaktree Elementary is part of a K-12 program that serves 2,200 students. Building modifications are need to the entries for energy efficiency.

Wavecrest Career Academy/Wavecrest Career Academy

Holland/City of Holland

Wavecrest Career Academy/Wavecrest Career Academy

Ottawa Area ISD

Holland/Olive Township

Ottawa Area ISD Ottawa Area ISD

Holland/Olive Township Zeeland/Allendale Township

Ottawa Area ISD

Holland/Olive Township

Ottawa Area ISD

Holland/Olive Township

Ottawa Area ISD/Sheldon Pines School Ottawa Area ISD/Careerline Tech Center & Sheldon Pines School

Ottawa Area ISD

Holland/Olive Township

Ottawa Area ISD/Thompson M-TEC

Ottawa Area ISD

Holland/Olive Township

Ottawa Area ISD/Thompson M-TEC

Ottawa Area ISD

Holland/Olive Township

Ottawa Area ISD/Thompson M-TEC

Ottawa Area ISD/Ottawa Area Center

tt i m

d e t

T O

-N

7/1/2009

Purchase of a 17,509 sf school building currently being leased from an LEA, as well as renovation and a 13,108 sf addition 7/27/2009 Partial renovation (37,787 sf) of vocational/technical school, plus additions onto main structure and secondary structure (22,070 sf total) 6/15/2009 Phase 2 of a 3-Phase renovation plan for administration building consisting of approx. 10,000 sf 6/1/2009

s t s

e u

q e R

O R

P P A

Goodrich High School

Ottawa Area ISD/Careerline Tech Center Ottawa Area ISD/Educational Services Building

Funding Request

1/9/2009

Goodrich HS is part of a K-12 program that serves 2,200 students. Facility needs include an upgrade of lighting equipment for energy efficiency, upgrade bathrooms to included low water use fixtures and meet ADA requirements, replace boilers and water heaters with energy efficient equipment, energy management controls to aid in reduced consumption of electricity and natural gas. 7/1/2009

Goodrich Area Schools Goodrich, MI

Expected Completion Date

6/10/2009

D VE

Renovation of 23 classroom toilet rooms to accommodate Special Needs students

7/27/2009

12/31/2009

$

1,051,341

Parking lot replacement

6/15/2009

8/28/2009

$

58,777

Replacement of 3 boilers (2 at Careerline Tech Center & 1 at Sheldon Pines School) 6/1/2009

8/28/2009

$

430,000

Parking lot expansion

6/15/2009

8/28/2009

$

130,000

Improvement to Welding lab exhaust system

7/6/2009

7/17/2009

$

25,464

12/31/2009

$

4,250,247

9/6/2009

$

185,000

8/10/2009

$

145,000

Orchard View Schools - district wide

Building addition of 4 classrooms, 2 science labs and student activity center to accomodate development of a middle college health sciences program 7/27/2009 add fiber backbone to all buildings, replace fiber/copper network switches, add servers, filters, network balancing hardware, backup systems 6/8/2009 Asbestas abaitment and containment at Middle School, Cardinal Elementary, OVEE, OVCEC 6/8/2009

Orchard View Schools - district wide

New vinyl floor and carpet as needed in all buildings

6/8/2009

8/10/2009

$

125,000

Orchard View Schools - district wide

Upgrade phone PBX with VOIP system

7/6/2009

9/4/2009

$

150,000

Orchard View Schools Muskegon

Orchard View Schools - High School

Renovate, restore, repair high school tennis courts used for PE and varsity sports

6/15/2009

6/30/2009

$

19,500

Orchard View Schools Muskegon

Orchard View Schools- High School

Additional security cameras at High School

6/8/2009

7/6/2009

$

12,255

ub

Orchard View Schools Muskegon Orchard View Schools Muskegon Orchard View Schools Muskegon Orchard View Schools Muskegon

02262009

Orchard View Schools - district wide

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

861 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Orchard View Schools Muskegon

Orchard View Schools - High School

Add security electronic locks at High School

6/8/2009

7/6/2009

$

6,500

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Boiler and HVAC upgrade at Middle School-exchange phnumatics for electronics

5/1/2009

9/4/2009

$

212,000

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Orchard View Middle School Parking Lot. Demo, roto-mill, re-surface, new asphalt

6/25/2009

7/30/2009

$

275,512

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Replace existing ceiling grid and tiles at Middle School

6/25/2009

7/30/2009

$

67,525

Orchard View Schools Muskegon

Orchard View Schools - Middle School

6/25/2009

$

62,525

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Replace existing lighting at Middle School Replace failing water supply runs (hot and cold) repipe and all fixtures at Middle School

9/4/2009

$

347,000

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Additional security cameras at Middle School

6/8/2009

7/6/2009

$

6,500

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Replace exterior doors and window walls

6/8/2009

9/6/2009

$

41,000

Orchard View Schools Muskegon

Orchard View Schools - Middle School

Exterior renovation-replace asbestos panels, replace faulty vents, windows as needed6/8/2009

9/6/2009

$

125,000

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Repair, renovate, locker rooms, toilet rooms

9/6/2009

$

65,000

Orchard View Schools Muskegon

9/6/2009

$

72,000

7/30/2009

$

150,480

7/30/2009

$

204,788

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Replace exterior doors and window walls 6/8/2009 Cardinal Elementary sidewalk and walking path between Cardinal elementary and end Orchard View Schools - Cardinal Elementary of Middle School 6/15/2009 Cardinal Elementary Parking lot. Demo existing lot, drives, and center lot, site grade, Orchard View Schools - Cardinal Elementary cut, fill, aggregate and final grade new asphalt 6/15/2009 Boiler and HVAC upgrade at Cardinal Elementary-exchange phnumatics for Orchard View Schools - Cardinal Elementary electronics 6/8/2009

9/6/2009

$

110,000

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Gymnasium, bleacher, locker room, fixtures, etc at Cardinal Elementary

5/18/2009

8/16/2009

$

85,245

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Mechanical Systems (Hot Water heaters, uni-vents, etc at Cardinal Elementary

6/8/2009

9/6/2009

$

92,525

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Additional security door lock systems at Cardinal Elementary

6/8/2009

7/6/2009

$

10,750

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Additional security cameras at Cardinal Elementary

6/8/2009

7/6/2009

$

9,750

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Install backup generator for voice and data system

6/8/2009

9/6/2009

$

21,534

Orchard View Schools Muskegon

Orchard View Schools - Cardinal Elementary Replace exterior doors and window walls

6/8/2009

9/6/2009

$

35,500

4/1/2009

$

254,417

9/6/2009

$

52,000

Orchard View Schools- Early Elementary

Reroof and insulate Orchard View Early Elementary Building 3/2/2009 Boiler and HVAC upgrade at Orchard View Early Elementary-exchange phnumatics for electronics 6/8/2009 Orchard View Early Elementary School - Enlarge Parking Lot. Site prep, aggregate, fill, new asphalt 6/8/2009

7/6/2009

$

35,000

Orchard View Schools- Early Elementary

Replace failing well with new well

4/15/2009

4/30/2009

$

12,000

Orchard View Schools- Early Elementary

Additional security cameras at Orchard View Early Elementary

6/8/2009

7/6/2009

$

4,500

Orchard View Schools Muskegon

Orchard View Schools- OVCEC

7/6/2009

$

6,225

Orchard View Schools Muskegon

Orchard View Schools- OVCEC

Add security electronic locks at Orchard View Early Elementary 6/8/2009 Boiler and HVAC upgrade at Community Education Center-exchange phnumatics for electronics 6/8/2009

9/6/2009

$

65,000

Orchard View Schools Muskegon Orchard View Schools Muskegon

m b u

Orchard View Schools- Early Elementary

Orchard View Schools Muskegon

Orchard View Schools Muskegon Orchard View Schools Muskegon

02262009

Orchard View Schools- Early Elementary

S

A T

O N

R d

e t t

it

Orchard View Schools Muskegon

Orchard View Schools Muskegon

st

e u

eq

s

6/5/2009

Submitted Requests - Not Approved

PP

O R

6/8/2009

7/30/2009

D VE

Route (Infrastructure Only)

862 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Orchard View Schools Muskegon

Saginaw Public Schools

Saginaw Public Schools

Saginaw Public Schools

Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools

Saginaw Public Schools

Saginaw Public Schools

Saginaw City

Saginaw City

Saginaw City

Saginaw City

Start Date

Saginaw City

12,500

4/15/2009

$

192,539

$

47,512,000

D VE

SPS Saginaw High School

9/1/2009

9/11/2009

$

46,239,000

SPS Saginaw Arts and Sciences Academy

NEW: Cafeteria/Commons, Kitchen and Greenhouse. REMODEL: Administration, Instrumental Music Room, Voice/Keyboard Lab, Multi Purpose Room, Theater Classroom, Dance studio, Media Center, Staff Lounge, Art Rooms, Student Display Area, Student Services, Classrooms, Science and Computer Labs. UPGRADE/REPLACE: HVAC, Boilers, Electrical Service, Lighting, Emergency Lighting, Fire Alarm and Improved Security Systems.

5/1/2009

12/30/2010

$

10,390,000

SPS Saginaw Career Complex

NEW: Allied Health Classrooms and Labs, Computer Labs, TV Studio, Early Childhood Classrooms and Hallway Enclosures, REMODEL: Entry and Commons/Large Group Instruction Area, Culinary Arts Classrooms and Labs, and Technical Classrooms. UPGRADE/REPLACE: HVAC, Boilers, Electrical Service, Lighting, and Emergency Lighting, Roofs, Fire Alarm, Security and Site improvements 5/1/2009

12/30/2010

$

30,000,000

REMODEL: Special Education, Foreign Language and Regular Classrooms, Science Labs, Administration, Staff Workroom and Lounge, Music Rooms, Life Skills and Tech Ed. Rooms, Counselling, Cafeteria, Kitchen, Computer Lab, Auditorium, Accoustical treatment at corridors and Media Center. REPLACE/UPGRADE: HVAC, Boilers, Roof, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building SecuritySystems, Site Improvements. 9/1/2009

8/30/2010

$

15,750,000

d e tt

SPS Thompson Middle School

it

m b u

S

$

NEW: Instrumental music, Vocal music, Commons, Kitchen, Administration, Receiving, Tech Lab, Scene Shop, and add AC. REMODEL: Classrooms, Special Education Rooms, Art rooms, Media Center, Auditorium, Student Services, Mechanical Rooms, Large Group Enstruction, Life Skills and Science Labs. UPGRADE/REPLACE: Window/Exterior, Electical Service, Roof, HV, Boilers, Lighting, Emergency Lighting, Fire Alarm, Security, and Site improvements.

Saginaw City

Saginaw City

7/6/2009

SPS Arthur Hill High School

SPS Central Middle School

Saginaw City

Funding Request

NEW: Special Education, Instrumental Music, Vocal Music, Commons, Kitchen, Administration, Receiving, Tech Lab and Scene Shop additions, and add AC. REMODEL: Classrooms, Special Education Rooms, Art Rooms, Media Center, Auditorium, Student Services, Mechanical rooms, Large Group Instruction, Life Skills and Science Labs. UPGRADE/REPLACE: Windows/Doors, Electrical Service, Roof, HV, Boilers, Lighting/Emergency Lighting, Fire Alarm, Security, and Site Improvements. 9/1/2009

Saginaw City

02262009

Project Description

Orchard View Schools- OVCEC Additional security cameras at Orchard Community Education Center 6/8/2009 Orchard View Schools - Alturnitive EducationOVCEC Reroof and insulate Orchard View Community Education and Alternative HS Building 3/16/2009

Orchard View Schools Muskegon

Saginaw Public Schools

Project Name

Expected Completion Date

T O

P P A

N s

t s e

qu

e R

O R 9/11/2009

Route (Infrastructure Only)

No Needs (New Middle School) 2008

SPS Eddy K-8 Academy

Building Security Systems, Upgrade Key System, Site Lighting, Replace bleachers.

5/1/2009

8/30/2009

$

2,380,000

SPS Zilwaukee K-8 School

NEW: Kitchen, Building Support, Media Center, Administration, Classrooms, Art, Science, Music and Pre-Kindergarten Classrooms, and add AC. REMODEL: Administration, Special Education Rooms, Classrooms, Parent Resource Room, Staff Workroom, Staff Lounge, Kindergarten. REPLACE/UPGRADE: HV, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 5/1/2009

8/30/2010

$

3,700,000

SPS Coulter Elementary School

NEW: Media Center, Cafeteria, Kitchen, Pre-Kindergarten, Art, Science, Music and Special Education Classrooms and add AC. REMODEL: Administration, Staff Lounge, Special Education Room, Classrooms, Parent Resource Room and Kindergartens. REPLACE/UPGRADE: HV, Boilers, Electrical Service, Lighting, and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 5/1/2010

8/30/2011

$

8,054,000

Submitted Requests - Not Approved

863 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Public Schools

Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools

Saginaw Public Schools Saginaw Public Schools

Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools

Saginaw Public Schools

Saginaw Public Schools Saginaw Public Schools

Project Name

Project Description

Start Date

SPS Handley/ PCAT School

REMODEL: Instrumental Music Room, Keyboard Lab, Auditorium, Cafeteria, Kitchen, Staff Lounge, Student Display Area, Student Services, Classrooms, Science Labs, Art Rooms, Vocal Music Rooms, and Media Center. REPLACE/UPGRADE: HV, Boilers, Windows/Exterior Restoration, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 5/1/2009

Saginaw City

SPS Heavenrich Elementary School

NEW: Media Center, Classrooms, Art/Science and Music Classrooms, add AC. REMODEL: Cafeteria, Kitchen, Administration, Staff Lounge, Staff Workroom, Special Education Rooms, Classrooms, Parent Resource Room and Kindergartens. REPLACE/UPGRADE: HV, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Securtity Systems, Site Improvements. 9/1/2009

Saginaw City

SPS Herig Elementary School

NEW: add AC REPLACE/UPGRADE: HV, Boilers, Lighting Systems.

5/1/2009

SPS Houghton Elementary School

NEW: add AC, Elevator. REPLACE/UPGRADE: HV, Boilers, Electrical Service, Lighting and Emergency lighting, Roof, Fire Alarm and Security Systems, Site improvements.

9/1/2009

Saginaw City

Saginaw City

A T

O N

Saginaw City

SPS Jerome Elementary School

Saginaw City

SPS Kempton Elementary School

Saginaw City

SPS Longfellow Elementary School

NEW: Cafeteria and Administration, add AC. REMODEL: Kitchen, Staff Lounge, Staff Workroom, Special Education Rooms, Classrooms, Parent Resource Room, Administration, Pre-Kindergarten, Kindergarten, Art/Science and Music Classrooms. REPLACE/UPGRADE: HV, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 9/1/2009

Saginaw City

SPS Loomis Elementary School

Saginaw City

SPS Merrill Park Elementary School

Saginaw City

d e tt

t i m

SPS Miller Elementary School

t s e

qu

e R

Proposed New Elementary School

D VE $

10,454,000

8/30/2010

$

5,577,000

8/30/2009

$

1,731,000

8/30/2010

$

2,548,000

8/30/2010

$

10,994,000

8/30/2009

$

2,600,000

8/30/2010

$

5,112,000

O R

5/1/2009

8/30/2010

$

15,000,000

NEW: Media Center, Kindergartens, Art/Science, Music, Special Education Classrooms and Administration, add Elevator and AC. REMODEL: Kitchen, Staff Lounge, Staff Workroom, Special Education Rooms, Classrooms, Parent Resource Room, and Pre-Kindergartens. REPLACE/UPGRADE: HV, Boilers, Roof, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 5/1/2009

8/30/2010

$

8,768,000

8/30/2011

$

6,273,000

8/30/2009

$

1,667,000

Saginaw City

SPS Rouse Elementary School

Saginaw City

SPS Stone Elementary School

NEW: add AC. REPLACE/UPGRADE: HV, Electrical service and Lighting.

02262009

Funding Request

Route (Infrastructure Only)

No Needs (New Elementary School) 2007

NEW: Kindergartens, Art/Science and Music Classrooms, Kitchen, add Elevator and AC . REMODEL: Media Center, Staff Lounge, Staff Workroom, Special Education Rooms, Classrooms, Parent Resource Room, Administration, Cafeteria and PreKindergartens. REPLACE/UPGRADE: HV, Boilers, Roof, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 5/1/2010

b u S

8/30/2010

PP

NEW: Media Center, Cafeteria, Art/Science, Music and Kindergarten Classrooms, add AC. REMODEL: Kitchen, Staff Lounge, Staff Workroom, Special Education Rooms, Classrooms, Parent Resource Room, and Administration. REPLACE/UPGRADE: HV, Boilers, Roof, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 9/1/2009 NEW: add AC. REPLACE/UPGRADE: HV, Window/Exterior Renovation, Electrical service, Lighting and Site Improvements., 5/1/2009

s

Expected Completion Date

Submitted Requests - Not Approved

5/1/2009

864 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools Saginaw Public Schools

Project Name

Project Description

Start Date

NEW: add AC. REMODEL: Administration, Special Education Rooms, Classrooms, Parent Resource Room, Pre-Kindergarten, Kindergarten, Art, Science, Music, Media Center, Cafeteria, and Kitchen. REPLACE/UPGRADE: HV, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site Improvements. 5/1/2010

Saginaw City

SPS Webber Elementary School

Saginaw City

SPS Admin.

$

1,348,000

Saginaw City

Service Center I

$

1,040,000

Saginaw City

Service Center II

Saginaw City

Maint/Trans

Saginaw City

Staff Developmnt Center

REPLACE/UPGRADE: Roof, HV, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Building Security Systems, Site improvements. 5/1/2009 REPLACE/UPGRADE: Roof, HV, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Security Systems, Site improvements. 5/1/2009 REPLACE/UPGRADE: Roof, HVAC, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Security Systems, Site improvements. 5/1/2009

8/30/2009

$

801,000

8/30/2009

$

1,093,000

8/30/2009

$

1,068,000

Schoolcraft Memorial Hospital (SMH) has in place plans and the necessary Michigan Department of Community Health Certificate of Need and Building Permits to construct a replacement hospital on land owned by the hospital. This project is ready for biding as soon as financing is approved. HUD financing is currently pending an improved hospital income statement. The hospital expects to turnaround its recently losses as a result of new physician recruitment to the community. The new physicians include a new orthopedic surgeon and a new general surgeon to replace retiring staff. The existing building is more that 50 years old, it has been deteriorating, and it no longer meets the community's needs for hospital services including surgical services, inpatient beds, emergency services, radiology and laboratory space. The project is approximately 103,000 sq. ft. including 18 hospital beds, all ancillary and support services, and a replacement building for our rural primary care clinic. Schoolcraft As soon as we Memorial Hospital and the Schoolcraft Memorial Rural Clinic are the only providers of receive funding.

Hospital Replacement Project

18 months after start date

$

36,610,406

Municipal Solid Waste (MSW) disposal remains a threat to the nation’s economy and the environment due to greenhouse gas emissions from landfills, air and water quality impacts, and increasing land use. The adoption of cleaner, advanced methods for the utilization of municipal waste for energy production can lead to a new source of clean, renewable energy profits to municipalities and their energy development partners, leading to economic development, energy security, and enhanced environmental performance. In addition, the opportunity is in alignment with the new Renewable Portfolio Standard (RPS) legislation passed by Michigan lawmakers in 2008, To date, however, no commercially-proven waste-to-energy gasification technology has been demonstrated at small to mid-size landfill sites. Through this effort, the state of Michigan has an exceptional opportunity to lead the world in demonstrating successful implementation of a new source of clean, renewable energy from an otherwise wasted (buried) resource. The Mid-Michigan Innovation Center (MMIC), a 501C-3 non-profit corporation located in Midland, Michigan is leading a consortia of industry and academ3/1/2009

2/28/2011

$

25,000,000

A T

Manistique/ Thompson

d e tt

t i m

MidMichigan Innovation Center, Inc. Midland

02262009

b u S

Advanced Renewable Waste-to-Energy Gasification Demonstration Facility

t s e

O R

PP

8/30/2009

O N

qu

e R

8/30/2009

Route (Infrastructure Only)

D VE

12,728,000

REPLACE/UPGRADE: Roof, HVAC, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Security System, New elevator, Site Improvements. 5/1/2009 REPLACE/UPGRADE: Roof, HV, Boilers, Electrical Service, Lighting and Emergency Lighting, Fire Alarm and Security Systems, Site improvements. 5/1/2009

8/30/2011

Funding Request

$

s

Schoolcraft Memorial Hospital

Expected Completion Date

Submitted Requests - Not Approved

865 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

MidMichigan Innovation Center, Inc. Midland

Grand Traverse Heritage Center

SEMCO Energy, Inc.

Renewable Energy Demonstration Center

Traverse City, Michigan Grand Traverse County Remodel & Painting of Community Area

Houghton, Painesdale

Houghton Area Natural Gas Reliability Improvements

Baraga, L'Anse

SEMCO Energy, Inc.

Battle Creek, Holland, Niles, Three Rivers, Port Huron, Richmond, Sandusky, Albion, and Upper Peninsula

tt i m

ub

S

St. Clair Co., Holland

02262009

d e t

Project Description

Start Date

Traditional uses of fossil fuels for manufacturing and heating of buildings are becoming less sustainable because of higher fossil fuel prices and questionable supply. Renewable energy sources can provide economical solutions that result in lower energy costs, more competitive manufacturing processes and accelerated job creation. The MidMichigan Innovation Center (MMIC) is a business incubation facility located on 110 acres in Midland County that is uniquely positioned to accelerate renewable energy development efforts. Located adjacent to the Midland City Landfill, and operating with the support of The Dow Chemical Company, MMIC is positioned to leverage it labs, technical expertise and university relationships to create a renewable energy demonstration site. Few places in North America can offer the technological expertise and resources available in mid-Michigan. Specifically, by combining multiple renewable energy sources (landfill gases, gasification, wind, solar, geothermal, and biomass,) and using them to produce energy, products, and services, it is possible to create a “Zero Energy Business Incubation Site” (i.e. no foss 3/1/2009

T O

This will be a remodel and upgrade of the Grand Traverse Heritage Center's Community Room, lobby and receptionist area. The Heritage Center is home to the Museum of History, Traverse Area Historical Society, Maritime Heritage Alliance, Rock & Mineral Club and Women's History Project and is open to the community for education, meeting space and heritage and archival resources. It's mission is to preserve and promote heritage of the Grand Traverse region. The remodel includes painting, drywall, wood trims, firring and base moldings. The project is for the part of the building that was built in the 1960's. ASAP

N s

Funding Request

qu

Natural Gas Facility Site Security

Homeland Security - Protection of Natural Gas Delivery System - Install intrusion prevention and detection infrastructure on natural gas storage, delivery and receipt facilities.

Bridge Infrastructure

Infrastructure Improvements - Energy Reliability - Replace natural gas infrastructure to support local/state bridge construction and to maintain reliable natural gas delivery. This is a labor intensive project utilizing skilled trades. 4/15/2009

Submitted Requests - Not Approved

4/15/2009

9/30/2010

$

15,000,000

2 Months

$

14,381

11/1/2010

$

11/15/2009

$

11/15/2009

$

11/15/2009

Route (Infrastructure Only)

D VE

t s e

Infrastructure Improvements - Energy Reliability - The Houghton area natural gas infrastructure is currently at design capacity. The local school in Painesdale has requested natural gas service which is not available with the existing system. Reinforcement of the existing natural gas system will provide service to the additional community of Painesdale, including the school. This would provide a more cost effective fuel to the area. Customers would save on energy costs, spur local business in the installation and conversion of natural gas appliances, improve property values and release money for other uses that is currently being spent on higher cost heating fuels. 4/15/2009

e R

O R

P P A

Infrastructure Improvements - Energy Reliability - Replace natural gas pipeline infrastructure. This area has one of the highest unemployment rates in the State. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future commercial and industrial growth, Baraga County Natural Gas Pipeline Reliability and improve the environment by mitigating greenhouse gas releases. This is a labor intensive project utilizing skilled trades. 4/15/2009 Improvements

SEMCO Energy, Inc.

SEMCO Energy, Inc.

Project Name

Expected Completion Date

$

M-26, Memorial, Sharon Ave, Portage, Lake, 5,000,000 Lakeshore, 7th

100,000 S. Main St

1,000,000 Various 96th and Pierce, Adams Rd., 144th, 200,000 Ottagon

866 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

SEMCO Energy, Inc.

SEMCO Energy, Inc.

Battle Creek City and Township, Litchfield and Albion City, Pennfield, Emmett, and Sheridan Townships

Port Huron, Marysville, Fort Gratiot, St. Clair

Project Name

Project Description

Battle Creek Area Natural Gas Pipeline Reliability Improvements

Port Huron Area Natural Gas Pipeline Reliability Improvements

Start Date

Infrastructure Improvements - Energy Reliability - Replace late 1800's natural gas infrastructure. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future commercial and industrial growth, and improve the environment by mitigating greenhouse gas releases. This is a labor intensive project utilizing skilled trades.

N s

Infrastructure Improvements - Energy Reliability - Replace early 1900's natural gas infrastructure. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future commercial and industrial growth, and improve the environment by mitigating greenhouse gas releases. This is a labor intensive project utilizing skilled trades.

t s e

SEMCO Energy, Inc.

Richmond, Algonac, Romeo, New Baltimore, Marine City, Chesterfield, Richmond Area Natural Gas Pipeline Bruce and Ira Townships Reliability Improvements

SEMCO Energy, Inc.

Infrastructure Improvements - Energy Reliability - Replace natural gas pipeline infrastructure. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future Holland City, Holland and Holland Area Natural Gas Pipeline Reliability commercial and industrial growth, and improve the environment by mitigating Zeeland Townships Improvements greenhouse gas releases. This is a labor intensive project utilizing skilled trades.

u q e

Niles and Three Rivers City

R d

Infrastructure Improvements - Energy Reliability - Replace early 1900's natural gas infrastructure. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future Niles/Three Rivers Area Natural Gas Pipeline commercial and industrial growth, and improve the environment by mitigating Reliability Improvements greenhouse gas releases. This is a labor intensive project utilizing skilled trades.

e t tt

i m

ub

4/15/2009

11/15/2009

O R

P P A

Infrastructure Improvements - Energy Reliability - Replace early 1900's natural gas infrastructure. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future commercial and industrial growth, and improve the environment by mitigating greenhouse gas releases. This is a labor intensive project utilizing skilled trades.

T O

SEMCO Energy, Inc.

Expected Completion Date

4/15/2009

11/15/2009

Funding Request

$

Enwood, Alden, Columbia, Gordon, Meadowlawn, Boyd, Stuart, 1,600,000 Maryland

$

Henry, Electric, Wisconsin, N. 9th, Goffe, Lasalle, Conger, Elk, Sandborn, Elmwood, North River, Vermont, Omar, Chestnut, 1,400,000 Oakland, Riverside

D VE

4/15/2009

11/15/2009

$

Market, Pearl, Water, Maria, Madison, Tillson, Hill, Sisson, Mary, State, Church, Ewell, West, Clarke, Washington, Robertson, Forton, Elsey, Mellen, Wand, Bruce, 1,000,000 Vernier

4/15/2009

11/15/2009

$

Lakeshore and 1,400,000 South Shore Drives

$

Cedar, Sheffield, Clarendon, Cherry, Grant, Lincoln, French, Lewis, 400,000 Miller

$

Wedge, Temple, Prospect, Front, Washington, Ridge, A, Garden, US-2, Johnson, Lake, Maple, Torch, Hecla, Library, Tamarak, Tierney, 5th, Bluff, Front, US-41, Old US-41, Case, Highland 900,000 Hills

4/15/2009

11/15/2009

S SEMCO Energy, Inc.

Calumet, Lake Linden, Ishpeming, Marquette, Negaunee, Laurium, Manistique, St. Ignace

02262009

Upper Peninsula Area Natural Gas Pipeline Reliability Improvements

Infrastructure Improvements - Energy Reliability - Replace natural gas pipeline infrastructure. In addition to the creation of pipeline construction jobs, these improvements will enhance the reliability of natural gas service, allow for future commercial and industrial growth, and improve the environment by mitigating greenhouse gas releases. This is a labor intensive project utilizing skilled trades.

Submitted Requests - Not Approved

Route (Infrastructure Only)

4/15/2009

11/15/2009

867 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Marine City and Marysville Natural Gas Storage Improvements

Energy Storage and Reliability - Drill a storage field well in an existing facility to increase energy deliverability and reliability. This will require skilled trades labor in the oilfield drilling and exploration industry. 5/15/2009

SEMCO Energy, Inc.

Port Huron, Marysville, St. Clair, Richmond, Chesterfield St Clair County High Volume Pipeline

Infrastructure Expansion - Energy Reliability - Improve Natural Gas System reliability with the installation of new natural gas pipeline. New pipeline will reinforce system pressures, provide redundant natural gas supply and allow for future local economic commercial/industrial growth. This is a labor intensive project utilizing skilled trades. 6/1/2009

SEMCO Energy, Inc.

Albion, Homer, Parma, Litchfield, Springport, Concord

Albion High Volume Pipeline

Infrastructure Expansion - Energy Reliability - Improve Natural Gas System reliability with the installation of new natural gas pipeline. New pipeline will reinforce system pressures, provide redundant natural gas supply and allow for future local economic commercial/industrial growth. This is a labor intensive project utilizing skilled trades. 6/1/2009

O R

Battle Creek High Volume Pipeline

Infrastructure Expansion - Energy Reliability - Improve Natural Gas System reliability with the installation of new natural gas pipeline. New pipeline will reinforce system pressures, provide redundant natural gas supply and allow for future local economic commercial/industrial growth. 6/1/2009

Holland High Volume Pipeline

Infrastructure Expansion - Energy Reliability - Improve Natural Gas System reliability with the installation of new natural gas pipeline. New pipeline will reinforce system pressures, provide redundant natural gas supply and allow for future local economic commercial/industrial growth. This is a labor intensive project utilizing skilled trades. 6/1/2009

Sanilac County High Volume Pipeline

Infrastructure Expansion - Energy Reliability - Improve Natural Gas System reliability with the installation of new natural gas pipeline. New pipeline will reinforce system pressures, provide redundant natural gas supply and allow for future local economic commercial/industrial growth. This is a labor intensive project utilizing skilled trades. 6/1/2009

SEMCO Energy, Inc.

SEMCO Energy, Inc.

Battle Creek Area

SEMCO Energy, Inc.

Holland City and Township, Zeeland Township

SEMCO Energy, Inc.

Sandusky, Brown City, Peck, Yale, Croswell, Lexington, Pt. Sanilac, Marlette, North Branch, Cass City, Kingston, Deckerville

SEMCO Energy, Inc.

SEMCO Energy, Inc.

SEMCO Energy, Inc.

st

s

O N

$

Gratiot Ave and 1,000,000 Angling Rd

D VE $

Gratiot, Michigan, I94, Allen, Newman, Range, Kennedy, Rattle Run, Bethuy, 3,000,000 Meisner

11/15/2010

$

E Michigan, Albion, Dafrymple, Crandell, Superior, 8,000,000 M-99

11/15/2010

$

Baseline Rd, and 1,600,000 North Ave

11/15/2010

$

88th, New Holland, 4,000,000 120th, Waverly

11/15/2010

11/15/2010

$

Emmett, Brockway, Burns Line, Van Dyke, Peck, 3,000,000 Sanilac

Infrastructure Expansion - Energy Reliability - Improve Natural Gas System reliability with the installation of new natural gas interconnect. New facilities will reinforce system pressures, provide redundant natural gas supply, and allow for future local economic commercial/industrial growth. This is a labor intensive project utilizing skilled trades. 8/1/2009

11/15/2010

$

Meldrum and 3,000,000 Puttygut

Battle Creek City

Battle Creek Manufactured Gas Plant Environmental Remediation

Environmental Clean-up - Project to accelerate the program to remediate and restore soil contaminated during the manufactured gas era and provide Brownfield redevelopment opportunities in an economically depressed area. This is a labor intensive project utilizing skilled trades and trained professionals. 5/15/2009

11/16/2010

$

3,000,000 Fountain Street

Albion City

Environmental Clean-up - Project to accelerate the program to remediate and restore soil contaminated during the manufactured gas era and provide Brownfield reAlbion Manufactured Gas Plant Environmental development opportunities in an economically depressed area. This is a labor Remediation intensive project utilizing skilled trades and trained professionals. 5/15/2009

11/16/2010

$

3,000,000 Eaton Street

$

Territorial, North, Emmett, N 23rd, 26th, 27th, 28th, East, Roosevelt, Yale, Jackson, Michigan, Lucille, M 1,700,000 49

Casco Twp

St Clair County Natural Gas Supply Station

tt i m

d e t

Battle Creek City and Township

02262009

e u

q e R

ub

S SEMCO Energy, Inc.

A T

PP

11/15/2010

Funding Request

Route (Infrastructure Only)

Battle Creek Area Infrastructure Improvements

Infrastructure Improvements - Energy Reliability - Replace natural gas infrastructure to support local/state municipal water/road and sewer improvements to maintain reliable natural gas delivery. This is a labor intensive project utilizing skilled trades. 3/15/2009

Submitted Requests - Not Approved

8/15/2009

868 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

SEMCO Energy, Inc.

Holland City, Holland and Zeeland Townships Holland Area Infrastructure Improvements

Infrastructure Improvements - Energy Reliability - Replace natural gas infrastructure to support local/state municipal water/road and sewer improvements to maintain reliable natural gas delivery. This is a labor intensive project utilizing skilled trades. 3/15/2009

SEMCO Energy, Inc.

Niles and Three Rivers City

Infrastructure Improvements - Energy Reliability - Replace natural gas infrastructure to support local/state municipal water/road and sewer improvements to maintain reliable natural gas delivery. This is a labor intensive project utilizing skilled trades. 3/15/2009

City of Grosse Pointe

Village of Paw Paw

Village of Paw Paw

Village of Paw Paw

Village of Paw Paw

Village of Paw Paw

Niles/Three Rivers Area Infrastructure Improvements

The City of Grosse Pointe is a residential community with 2.3 square miles of direct storm water drainage to Lake St. Clair. By purchasing an American made vactor truck to clean storm water sewer systems tons of pollution would be removed from entering the local waterways. Spring 2009

City of Grosse Pointe, MI Vactor Truck

8/15/2009

PP

O R 8/15/2009

On-Going

Village Energy Efficiency Project - Greening Public Buildings

Install energy efficient electrical (lighting) fixtures; install roof top solar panels for electric and heating/cooling energy source at four Village buildings: Fire Station, Police Station, Public Works Complex and the Carnegie Center office and community building. Goal-LEED Certification. Paw Paw, Village 5/15/2009

Village Energy Efficiency Project - Greening Historic Village Hall

Install energy efficient electrical (lighting) fixtures; install roof top solar panels for electric and heating/cooling energy source, and sidewall insulation at the historic Village Hall (Van Buren County's first courthouse, 1845). Requires sympathetic rehabilitation per SHPO. Goal-LEED Cert. or as close as we can get.

3

Village Energy Efficiency Project - Bring Mothballed Hydro Plant Back on Line

Implement feasibility and engineering studies to bring a 0.67 MGW hydro plant back on line. Reduces electrical energy Village purchases from IM/AEP, a predominant coal-power electrical energy producer. Reduces costs to our customer. Net metering saves Village money. Paw Paw, Village 5/15/2009

4

Provide wind or solar power for the Village's aerated waste water lagoons. Current electrically powered system is very expensive. Have 400 acres on which to install Village Energy Efficiency Project - Alternative solar panels or wind turbines to proved electrical power. Reduces purchased power Power for Aerated Lagoons from predominant coal power provider IM/AEP. Paw Paw, Village 7/15/2009

1

2

e t t

6

Water for Growth and Jobs

Village of Paw Paw

7

Forced sanitary main across Paw Paw River

it

S

Village of Paw Paw

10

02262009

s

t s e

O N

u q e

Supplement the Village's own program for homeowners and landlords to purchase energy efficient furnances and appliances. Village provide small grants to homeowners now. Very successful program and could do more.

Elevated storage tank, 400,000 gallon booster station, 4000 LF of watermain, and production well on south side of I-94 where medical and retail growth is planned. Potential 350+ jobs Install 4,000 LF of sanitary force main across Paw Paw River. Currently one line which has had breaks near the river in 2 of last 4 years.

$

W 11th, 18th, 19th, 20th, 21st, 22nd, 23rd, Central, College, 40th, Colonial, 700,000 Huinzenga, River

$

9th, Lake, Regent, Maple, Hickory, 1,000,000 3rd, 4th Ave

D VE $

245,000 City Streets

Paw Paw, Village 5/15/2009

Paw Paw, Village 5/15/2009 Paw Paw, Village 5/15/2009

Downtown Infrastructure

Major & Local Street Resurfacing

Resurface 40% of Village Major and Local Streets which are the Village's lowest paser rated streets in town. $200,000 local funds to go with $850,000 in stimulus funding. Includes stormwater runoff prtections per BMPs

Watershed Management Project

Implement Paw Paw Watershed Management Plan BMPs with focus on sediment loading prevention BMPs, treatment and removal of arsenic laden sediment. Includes conservation easements, weirs, sediment traps, vegetative buffers and other BMPs in plan. Paw Paw, Village 5/15/2009

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

Paw Paw, Village 6/15/2009

Infrastructure reconstruction including street, sidewalk, energy efficient street lighting, watermain improvements, storm and and sanitary sewer improvements. Affects 650 jobs and 188 businesses in DDA District. $300,000 local funding to go with $450,000 stimulus funding.

m b u

Village of Paw Paw

A T

R d

Village Energy Efficiency Project - Home Efficiency program

5

Village of Paw Paw

Village of Paw Paw

Expected Completion Date

5/15/2009

Michigan, Niles, Paw Paw, Gremps & Kalamazoo

5/15/2009

Resurfacing 40% of all Village Major and Local streets Paw Paw River, Briggs Pond and Maple Lake

869 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Paw Paw

Jackson County

Jackson County

Jackson County

Project Name

Project Description

Start Date

Expected Completion Date

Watermain Upgrade

Upgrade 4" watermains along Gremps, Brown, LaGrave, Drew, Harris, Hazen, Dyckman, Elm, Fadel, Lily, Lake, Willard, and Hamilton street watermains. Old lines subject to frequent breaks and leaks. Paw Paw, Village 5/15/2009

Cascades Golf Course Irrigation Renovation

Cascades Golf Course is an 18 hole championship golf course owned and operated by Jackson County. Opened in 1929, Cascades has offered a premier golf experience for local and regional golfers. The golf course has retained its natural beauty and original design. The course is in need of an updated irrigation system. Much of the original irrigation system (1929) is still in use at the facility. A major overhaul of the irrigation system throughout the 18 hole course is needed. Request for $700,000.

Spring Arbor Township, Jackson County

Falling Waters Trail, Teft Road Trailhead Parking

The Falling Waters Trail is a non-motorized pathway that connects the City of Jackson and the Village of Concord. Completed in 2007, the 10.5 mile rail-trail has been used by an estimated 70,000 users. The trail offers a wonderful alternative for nonmotorized transportation for the County of Jackson. The trail's popularity has propagated the need for a new trailhead parking area near the halway point of the pathway. Engineered drawings for the new parking facility calls for 50 parking spaces Request for $55,000. 4/1/2009

Spring Arbor Township, Jackson County

Lime Lake County Park is a day-use facility located on undeveloped Lime Lake near Spring Arbor, Michigan. The 200+ acre lake offers the rare opportunity to enjoy a pristine, undeveloped marine setting in southern Michigan. An upgraded concrete plank boat launch was added to the park in 2007. The remainder of the park's infrastucture needs attention, however, as the existing parking area has shown serious erosion problems over the past several years. Engineering is complete to upgrade both the parking area as well as the vehicle containment system. Request Lime Lake County Park - Parking Renovation for $45,000. 4/1/2009

11

Summit Township, Jackson County

Jackson County

Jackson, Michigan

City of Tecumseh

City

City of Tecumseh

City

City of Tecumseh

City

T O

P P A

N s

st

e u

Recreate an inviting public recreation area of canals and ponds, bridges and trails that will be used by over 300,000 people every year to walk, run, fish, canoe and in genera become physically fit and grow mentally. The dredging of the waterways will reverse the ecological issues caused by the current weed-choked low water table. Deepening the canals from their current 1-3 ft. level to 5 ft. and ponds from as shallow as 3 ft. to a 10 ft. depth will drastically improve the ecological condition of the park. This renovation to our nationally recognized Cascades Falls Park will assist in increasing 4/1/2009 Cascades Park - Pond and Canal Renovation tourism to Jackson. Request for $2,400,000. Installation of an irrigation system on West M-50, from Sunset Street to the West City Irrigation System Limits 4/1/2009

tt i m

d e t

700,000

6/1/2009

$

70,000

6/1/2009

$

90,000

4/1/2010

$

40,000,000

6/1/2009

$

75,000

1/1/2009

$

450,000

Community Center Renovation

This is a historic building owned at one time by Henry Ford. The building needs considerable renovations so that it may be preserved and made more efficient

11/1/2009

TBD

$

1,500,000

roofing project

replace roofing on two historic buildings on IXL museum property $7000 is needed fo suggested May 1, suggested June labor 2009 20, 2009

11/9/2009

$

11/9/2009

$

City of Grand Rapids

Grand Rapids

Garfield Pool/Bath House Demolition

Demolition and removal of swimming pool and bath house. Restoration of the site to turf plus the addition of a water playground. 5/9/2009

City of Grand Rapids

Grand Rapids

Veteran's Memorial Park Improvements

Walkway, fountain, landscaping and signage improvements.

02262009

$

9/1/2009

ub

S

10/1/2009

D VE

Renovate existing interior space at Tecumseh City Hall, including replacement of windows and other energy efficient systems. This project will allow the City to serve its residents without adding additional space.

City Hall Renovations

IXL Historical Museum W5561 River St. P.O. Box 162 Hermansville Hermansville - Meyer Mi. 49847 Township

q e R

O R

4/1/2009

Funding Request

Submitted Requests - Not Approved

5/9/2009

Route (Infrastructure Only)

Madison Avenue south of Burton 915,000 Street Fulton Street at 750,000 Sheldon Avenue

870 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grand Rapids

Grand Rapids

Project Name

Project Description

Start Date

Joe Taylor Park Improvements Park expansion and development in conjunction with CSO improvements.

Underground stormwater detention and expansion of Joe Taylor Park

6/9/2009

11/9/2009

Project Description: Two buildings at Garfield Park are connected to an outdated sewer line that feeds to Madison Ave. A new and more direct connection to Burton Street is needed.

5/9/2009

6/9/2009

City of Grand Rapids

Grand Rapids

Garfield Sewer Line Connection

City of Grand Rapids

Grand Rapids

Community Archives and Record Center (CARC) Improvements

City of Grand Rapids

Grand Rapids

Project Description: Reconstruction of an outdated market including new market Fulton Street Farmers Market Reconstruction building, vendor stalls, and parking

6/9/2009

City of Grand Rapids

Grand Rapids

Fulton Street Farmers Market Reconstruction Resurfascing the parking lot, entry drives

6/9/2009

City of Grand Rapids

Grand Rapids

Ah-Nab-Awen Renovations

Landscaping, lighting, walkway reconstruction and floodwall repair

Grand Rapids

Various Park and Cemetary Locations Paving Repairs

Removal and replacement of paved lots and drives that are beyond maintenance efforts - Belknap, Garfield, Highland, Mulick, Richmond, Riverside Parks and the Fairplains, Fulton, Greenwood, Oakhill, Oakgrove, and Woodlawn Cemeteries.

5/9/2009

Government Buildings - Energy efficiency improvements and retrofits

This project would replace existing facility systems such as heating and cooling, electrical, glazing and roofing systems with new energy efficient and sustainable systems.at various locations

City of Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

City of Grand Rapids

u S

Grand Rapids

Grand Rapids

02262009

Expected Completion Date

s

st

The majority of the existing lighting system is 4 foot fluorescent lamp system with a T12 magnetic ballast. This system would be replaced with a new energy efficient T8 fixture with an electronic ballast along with a lighting.

e u

bm

Riverside West Trail - Ann Street to North Park Street

Streetscape Improvements to Madison Avenue and Hall Street

12/9/2009

$

Fulton Street west 3,100,000 of Fuller Avenue

8/9/2009

$

1,100,000 Various Locations

4/9/2009

12/10/2009

$

2,000,000 Various Locations

4/9/2009

12/10/2009

$

City Hall Glazing Replacement

Government Buildings

State Street east of 5,441,400 Jefferson Avenue

$

The existing building glazing is a 1/4 inch single pane covered by window screens on 3 sides. There is approximately 31,000 square feet of glazing. This project would remove the existing glazing and window screens and repl 4/9/2009

itt

$

11/9/2009

Placement of locally produced wind turbines on city buildings

Energy efficiency - homes retrofit

Burton Street west 45,000 of Madison Avenue

$

City Hall Lighting Upgrade Government Buildings - On site wind power projects

d e t

D VE

Fulton Street west 100,000 of Fuller Avenue Pearl Street at the 750,000 Grand River

A T

O N

Baxter Street and 750,000 Diamond Avenue

$

$

O R

PP

Funding Request

Route (Infrastructure Only)

300 Monroe 400,000 Avenue NW

$

2,500,000 Various Locations

12/10/2009

$

300 Monroe 1,200,000 Avenue NW

About 400 ageing properties will be retrofitted to reduce energy consumption and greenhouse gas emissions, and save water. The project will help maintain affordable housing by lowering utility bills, and stimulate the economy by providing work for product manufacturers, energy auditors, and installation contractors. Additionally, youth will be trained in “Green” job skills. 3/9/2009

9/10/2009

$

3,000,000 Various Locations

On site, City buildings - Solar Panel Projects

1/10/2009

$

5,000,000 Various Locations

$

West side of Grand River from Ann Street to North 1,500,000 Park Street

$

Hall Street from Jefferson Avenue to Madison Avenue and Madison Avenue from Adams Street to 2,390,573 Hall Street

q e R

Construction of bike path adjacent to the Grand River

Ornamental street lighting, streetscape and other improvements in neighborhood business area

Submitted Requests - Not Approved

6/9/2009

871 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grand Rapids

City of Grand Rapids

Project Name

Project Description

Repairs and Sixth Street Bridge over the Grand River

Grand Rapids

Reconstruction of Leonard Street from Remembrance Road to Collindale Avenue

Grand Rapids

Grand Rapids

Plaster Creek Trail Phase III

City of Grand Rapids

Grand Rapids

Riveredges Trail

Grand Rapids

Wealthy Street Bridge over the Grand River (Already under contract to MDOT)

City of Grand Rapids

City of Grand Rapids

West approach replacement, replace existing bituminous & timber deck with a glulam deck and new HMA surface, electrical work, repairs around bearing areas

Reconstruction including pavement, curb and gutter, public and private utiliites

A T

Deck replacement and related work

Funding Request

$

Non-motorized trail from Division Avenue west to Oxford Street. This project would be in conjunction with the City of Wyoming - through which a large segment of this Phase would run through. Non-motorized trail on the east side of the Grand River from Canal Street Park to Ann Street 4/9/2009

City of Grand Rapids

City of Grand Rapids

Start Date

Expected Completion Date

PP

O R 11/9/2009

D VE $

$

Division Avenue to 2,825,000 Oxford Street Canal Street Park 4,100,000 to Ann Street

$

Wealthy Street Bridge over the 1,285,000 Grand River

$

$

Ionia Avenue from Fulton Street to 2,200,000 Fountain Street

Reconstruct alleys

$

Madison & Union Avenues and Woodlawn & Umatilla Streets Alley between Madison & Paris Avenues and Crawford & Gilbert Streets Alley between Madison & Paris Avenues and Gilbert & Adams Streets Alley between Jefferson & Cass Avenues and Hall & Garden 1,050,000 Streets

Repair/refurbish various concrete streets to extend the life of the pavement

$

1,000,000 Various Locations

$

Ionia Avenue south 2,800,000 of Mason Street

Reconstruction of the street including curb and gutter, sewer separation, watermain, and private utilities

Grand Rapids

Reconstruction of Ionia Avenue from Fulton Street to Fountain Street

Reconstruction of the street including curb and gutter, ornamental lighting, streetscape, watermain, and private utilities

s

t s e

u q e

R d

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

S

ub

Grand Rapids

02262009

Leonard Street from Remembrance Road to Collindale 2,500,000 Avenue

$

O N

Reconstruction of Sheldon Avenue from Highland Street to Delaware Street

e t tt

i m

Sixth Street Bridge 1,250,000 over Grand River

Sheldon Avenue from Highland Street to Delaware 850,000 Street

Grand Rapids

Reconstruction of alleys in Hattie Beverly Project Area Concrete street repair at various locations in the City

Route (Infrastructure Only)

Parking lot construction for economic development and infrastructure development: 139 space parking lot on two levels with a pedestrian stairway connection. Project wil 801 Ionia parking lot (land plus construction) support the neighborhood and adjacent building renovation by private developer. 6/9/2009

Submitted Requests - Not Approved

10/9/2009

872 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grand Rapids

Grand Rapids

Project Name

Project Description

Start Date

P P A

Reconstruction of the streets including curb and gutter, street lighting, watermain, sewer separation and private utilities in preparation for bus rapid transit (BRT) system

Electric snow melt in the drive ramps are failing. Sections have burned out and no longer heat. Over time more sections will fail resulting in large areas of ice and snow on drive ramps creating safety issues for vehicles and pedestrains. Project will replace existing electric snow melt system with boiler heated closed loop glycol system. Project will require demotion and removal of existing ddrive ramps, installing new drive rmaps with closed loop snow melt system, installation of gas fired boilers. 6/9/2009

T O

N s

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

Bridges - Maintainance & Repairs

Extend the life of various bridges through repair and deferred maintenance

Grand Rapids

Plaster Creek Walkway Retaining Wall near Kroc Center

Construction of a retaining wall and walkway on City property adjacent to Plaster Creek which will allow for a future non-motorized trail connection into the City of Wyoming and eventually to Kent Regional trails

Grand Rapids

Parking lot construction for economic development, infrastructure development, and housing 260 space public parking ramp integrated into a mixed use development.

Grand Rapids

Parking lot construction for economic development and infrastructure development Diamond Parking lot Small 8-11 space parking lot in a neighborhood business area.

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

City of Grand Rapids

u S

Grand Rapids

Grand Rapids

02262009

O R

Reconstruction of Miscellaneous BRT Route Streets

Government Center Ramp, Snow Melt Replacement

City of Grand Rapids

R d

Millennium Park - Wealthy Street Extension Estimate

e t t

Extend Wealthy Street and improve existing street network in the vicinity of Kent County's Millennium Park

Funding Request

9/9/2009

$ $

$

$

5/9/2009

10/9/2009

Route (Infrastructure Only)

Ransom Avenue from Fulton Street to Lyon Street, Lafayette Avenue from Fountain Street to Michigan Street, Jefferson Avenue from Cherry Street to Fulton Street, and Division Avenue from Franklin Street to Wealthy 11,890,669 Street

D VE $

st

e u

eq

Expected Completion Date

$

$

300 Monroe 165,000 Avenue NW 5,000,000 Various Locations Division Avenue at 465,000 Plaster Creek Fulton Street at 12,000,000 Division Avenue Diamond Avenue 100,000 and Fulton Street Wealthy Street/Garfield Avenue to East 15,000,000 City Limits

$

Seward Avenue from Butterworth Avenue to Fulton 3,500,000 Avenue

Rotomill/resurface Streets – Various Locations Extend life of pavement and avoid larger future reconstruction costs

$

22,500,000 Various Locations

Sidewalk Ramps at Intersections & Alleys

$

1,000,000 Various Locations

$

28th Street from Division Avenue to 3,000,000 East Paris Avenue

$

Plainfield Avenue from Fuller Avenue 1,000,000 to 4 Mile Road

it

Seward Avenue extension

bm

Continue the extension of Seward Avenue to provide a connector route for industry and remove trucks from neighborhood streets

Meet ADA requirements at various locations

Sidewalk and ADA Ramp Installation along M11 Provide sidewalk and ramps along busy trunkline

Sidewalk and ADA Ramp Installation

Provide sidewalk and ramps along busy trunkline

Submitted Requests - Not Approved

873 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

Project Name

Project Description

Improvements to the Police Department firearms range Parking Security Infrastructure upgrade and Energy conservation

US-131 Westside Embankment Upgrade Neighborhood-based Crime Prevention Community Development

6 months after approved

Improve flood protection

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

Watermain replacement Watermain replacement and street resurfacing Replacement of the Kingsbury Lift Station and Forcemain Sanitary lift station replacement Replacement of Low Lift Valves at Lake Michigan Filtration Plant Water valve replacement

City of Grand Rapids

Grand Rapids

Miscellaneous Structural Repairs at MARB

Grand Rapids

Start Date

Removal of lead-contaminated soil which makes up the protective berm of the firearms range; restoration of the berm to include a total containment trap to provide a viable solution do the lead contamination; additional lighting for safety purposes and 2 months after improvements to the range house including additional classroom and storage space approved Upgrades to existing parking security cameras. Installation of small wind-turbines or solar film or green roof to conserve energy. 5/9/2009

City of Grand Rapids

City of Grand Rapids

s

Structural repairs

st

A T

O N

$

At the Wastewater 500,000 Treatment Plant

10/9/2009

$

120,000 Various Locations

$

Parallel to the Grand River from south of Wealthy Street to Ann 2,908,528 Street

$

650,000 Various Locations

O R

PP

2 months after approved 4 months after approved 4 months after approved 2 months after approved

e u

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

Line (CIPP) 2000' of WWTP Scrubber pipeline Cast in place liner of scrubber line

City of Grand Rapids

Grand Rapids

Odor Control at the WWTP

Flow gate replacement

eq

Emergency generator replacement

R d

Construct systems to reduce/eliiminate odors at the wastewater treatment plant

6 months after approved 3 months after approved 2 months after approved 12 months after approved

Funding Request

D VE

6 months after contract award

2 months after contract award 8 months after contract award 8 months after contract award 6 months after contract award

4 months after contract award 8 months after contract award 2 months after contract award 8 months after contract award

$

Lockridge Street from Diamond 175,000 Avenue to east end Kingsbury Lift 2,100,000 Station Lake Michigan 75,000 Filtration Plant

$

1,135,000 Market Avenue

$

Hall Street from Jefferson Avenue 2,000,000 to Madison Avenue Wastewater 1,200,000 Treatment Plan

$ $

$ $

$

200,000 Various Locations Wastewater 180,000 Treatment Plan Wastewater 2,000,000 Treatment Plan

$

Dolbee Avenue Sherman Street to Baxter Street; Baxter Street Dolbee Avenue to Fuller Avenue; Diamond Avenue Baxter Street to Logan Street; Bemis Street Diamond Avenue to Neland Avenue; Neland Avenue Sherman Street to Baxter Street (Joe 2,750,000 Taylor Pa

$

i m

b u S City of Grand Rapids

Grand Rapids

02262009

East Side CSO Cn#19

Reconstruction of the streets including curb and gutter, watermain, sewer separation and private utilities in coordination with neighborhood redevelopment

Submitted Requests - Not Approved

Route (Infrastructure Only)

3 months after contract award

Reconstruction of the street including curb and gutter, watermain, sewer separation and private utilities

Contract No. 10 Replacement of Process Gate Actuators at the WWTP Replacement of Emergency Generators at Various Locations

e t tt

Expected Completion Date

874 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

Project Name Construction of Aggregate Storage Bins at Sewer Maint Building

Project Description

Start Date 3 months after approved 12 months after approved 3 months after approved

Construction of aggregate storage building

Conversion of the PERB to FEB at the WWTP Process changes at the wastewater treatment plant Improvements to the Final Effluent Screw Pumps at WWTP Process improvements at the wastewater treatment plant

Watermain replacement

Watermain replacement and street resurfacing

A T

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

s

t s e

O N

Sanitary Sewer and Watermain Replacement Sanitary sewer and watermain replacement and street resurfacing

Saddleback Trunk Sewer Cn #1

East Side Combined Sewer Overflow

d e tt

qu

Reconstruction of a vital sanitary trunk sewer

e R

O R

PP

3 months after approved

2 months after approved

4 months after approved

Expected Completion Date Funding Request 4 months after contract award $ 260,000 6 months after contract award $ 800,000 6 months after contract award $ 800,000

D VE

3 months after contract award

5 months after contract award

8 months after contract award

Reconstruction of the street including curb and gutter, watermain, sewer separation and private utilities

$

Ann Street from Plainfield Avenue to Oakwood Avenue and Oakwood Avenue from Ann Street to Knapp 260,000 Street

$

Chatham Street and Jackson Street from Straight Avenue to Gold Avenue and in Straight Avenue and National Avenue from Jackson Street to 1,250,000 Chatham Street

$

In Public Easement, S.E. from Shaffer Avenue to 600 ft 6,200,000 east of East Paris

$

Hall Street from Jefferson Avenue 4,375,000 to Madison Avenue

$

Dean Lake Service Center Drive (Private) from 1000' S of Knapp Street to Knapp Street, and in Knapp Street from 1290' E of Dean Lake Avenue to East Beltline Avenue (M-44), and in East Beltline Avenue (M-44) from Leonard Street to Knapp 6,243,000 Street

$

1,000,000 Various Locations

t i m

b u S City of Grand Rapids

Grand Rapids

Transmission Watermain

City of Grand Rapids

Grand Rapids

Miscellaneous Watermain Valve Repalcement Watermain valve replacement

02262009

Construction of transmission watermain to serve an area of expanding demand

Submitted Requests - Not Approved

2 months after approved 3 months after approved

6 months after contract award 8 months after contract award

Route (Infrastructure Only) 660 Market Avenue S.W. Wastewater Treatment Plan Wastewater Treatment Plan

875 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Grand Rapids

Project Name

Saddleback Trunk Sewer Cn #4

Replacement of the Bona Vista Lift Station

4 months after approved

Reconstruction of a vital sanitary trunk sewer

Replace sanitary lift station

T O

Watermain replacement and street resurfacing

P P A

6 months after contract award

2 months after approved

3 months after contract award

t s e

Watermain replacement and street resurfacing

Watermain replacement

e R

Watermain replacement and street resurfacing

d e t

O R

Watermain replacement and street resurfacing

4 months after approved

4 months after approved

2 months after approved

Funding Request

$

In Public Easement S.E. from Burton Street to 5,000 ft 3,900,000 north of I-96

$

Turner Avenue from 1st Street to Bridge Street and in Bridge Street from Turner Avenue to the 3,900,000 Grand River

$

South of Lake Michigan Drive on 2,200,000 Bona Vista Drive

$

Breton Avenue from Burton Street 250,000 to North City Limit

$

Grove Avenue from Plainfield Avenue to Taylor Street and in Taylor Street from Grove Avenue to 540,000 Plainfield Avenue

4 months after contract award

$

Van Auken Drive from Fuller Avenue to Kalamazoo 520,000 Avenue

3 months after contract award

$

Washtenaw Street from Westlane Avenue to the East 410,000 End

3 months after contract award

b u S City of Grand Rapids

Grand Rapids

02262009

East Side CSO Cn#14

Reconstruction of the street including curb and gutter, watermain, sewer separation and private utilities

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

3 months after approved

qu

Watermain replacement

2 months after approved

8 months after contract award

5 months after contract award

N s

Watermain replacement

tt i m

Start Date

Relocate vital trunk sewer to street including watermain, street lighting, street reconstruction and streetscape

Sewer Relocation

Watermain replacement

Project Description

Expected Completion Date

$

Pleasant Street from Sheldon Avenue to Morris Avenue; Sheldon Avenue from Pleasant Street to Buckley Street; LaGrave Avenue from Pleasant Street to Buckley Street; and Madison Avenue Pleasant Street to 10,700,000 Logan Street

876 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Grand Rapids

Grand Rapids

Project Name

Project Description

4 Mile Road Elevated Storage tank

Start Date 3 months after approved

Route Expected (Infrastructure Completion Date Funding Request Only) 8 months after Bristol Aveneu near contract award $ 2,000,000 4 Mile Road

Construction of elevated storage tank for increased demand

O R

City of Grand Rapids

Grand Rapids

Replacement of watermain

4 months after approved

4 months after contract award

4 months after approved

2 months after contract award

e u

2 months after approved 3 months after approved 3 months after approved 9 months after approved 3 months after approved

4 months after contract award 4 months after contract award 4 months after contract award 8 months after contract award 8 months after contract award

Reconstruction of a vital sanitary trunk sewer

2 months after approved

6 months after contract award

3 months after approved 3 months after approved 3 months after approved

8 months after contract award 6 months after contract award 6 months after contract award

Grand Rapids

Watermain replacement

Watermain replacement and street resurfacing

City of Grand Rapids

Grand Rapids

Water tank improvements and painting

City of Grand Rapids

Grand Rapids

Alger Reservoir Improvements Concrete Restoration at Lake Michigan Filtration Plant - Phase 3

City of Grand Rapids

Grand Rapids

Concrete Restoration, Phase 2, at the LMFP

Concrete restoration of pipe galleries

City of Grand Rapids

Grand Rapids

Replace transformers and related equipment

City of Grand Rapids

Grand Rapids

Livingston Power Subyard upgrades Replacement of Pump Motor Starters for Franklin pumps 1 and 3

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

City of Grand Rapids

City of Grand Rapids

City of Grand Rapids

Saddleback Trunk Sewer Cn #3

T O

Watermain replacement and street resurfacing

City of Grand Rapids

City of Grand Rapids

P P A

s t s

Concrete restoration of pipe galleries

eq

-N

Pump motor replacement

R d

e t tt

Water valve replacement

Grand Rapids

Replacement of Valves at Monroe tank Structural Strength Improvements at Lake Michigan Filtration Plant - Phase 2 Concrete Restoration at Lake Michigan Filtration Plant - Phase 4

Grand Rapids

East Side Combined Sewer Overflow (CSO) Cn#12A

Reconstruction of the street including curb and gutter, watermain, sewer separation and private utilities

East Side CSO CN#12B

Reconstruction of the street including curb and gutter, watermain, sewer separation and private utilities

i m

b u S

Grand Rapids

02262009

D VE

Concrete restoration at various locations Concrete restoration of pipe galleries

Submitted Requests - Not Approved

$

$

Chamberlain Avenue from Southampton Street to Millbrook Street and in Clearbrook Street from Dawes Avenue to Chamberlain Avenue and in Eastbrook Street from Dawes Avenue to Chamberlain 1,080,000 Avenue Hovey Avenue from Lane Street to 80,000 Fulton Street

$

Alger Street west 1,400,000 of Division Avenue Lake Michigan 670,000 Filtration Plant Lake Michigan 380,000 Filtration Plant Livingston Street at 250,000 Coit Avenue Franklin Street at 300,000 Fuller Avenue

$

Patterson Avenue from 28th Street to 2,800,000 Burton Street

$ $ $ $

$

Monroe Avenue north of Leonard 100,000 Street Lake Michigan 290,000 Filtration Plant Lake Michigan 1,390,000 Filtration Plant

$

Madision Avenue from Adams Street 2,850,000 to Hall Street

$

Madision Avenue from Hall Street to 3,500,000 Franklin Street

$ $

877 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Grand Rapids

Grand Rapids

City of Grand Rapids

Grand Rapids

Reconstruction of the street including curb and gutter, watermain, sewer separation East Side CSO Cn#20 and private utilities in conjunction with neighborhood revitalization Renovations of Filters 3, 5, 7 and 9 at Lake Michigan Filtration Plant Refurbishing of filters at water treatment plant Replacement of High Lift #2 Discharge Valves at Lake Michigan Filtration Plant Replace water valves

City of Grand Rapids College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies

Grand Rapids

Replacement of the Bird Avenue Lift Station

City of Grand Rapids

Grand Rapids

Expected Completion Date

5 months after contract award 8 months after contract award

$

Donald Place, Robey Place, Freyling Place, Calkins Avenue, Visser Place, McKinley Court, Fairmont Street, north of Wealthy Street (Wealthy 3,200,000 Heights) Lake Michigan 2,200,000 Filtration Plant Lake Michigan 500,000 Filtration Plant

4 months after approved

8 months after contract award

$

Bird Avenue north 1,050,000 of 3 Mile Road

5/1/2009

9/1/2009

$

31,038,721

5/1/2009

9/1/2009

$

3,086,449

4 months after approved 4 months after approved

A T

Sanitary lift station replacement

Funding Request

PP

O R

D VE $

$

Detroit

Middle/High Charter School

Detroit

Middle/High Charter School Gymnasium

Detroit

Third Party Lease Space - White Box Condition

5/31/2008

9/1/2009

$

12,799,425

Detroit

Conference Center 6/1/2009 Technology Infrastructure, Services & Support - Rapid Prototyping, 3D Visualization, Imaging Center & Voice/Data Technology 5/31/2008

9/1/2009

$

4,562,074

9/1/2009

$

7,457,826

Road, Infrastructure, Streetscape, Parks & Landscaping

5/1/2009

9/1/2009

$

1,197,643

10/1/2008

9/1/2009

$

9,627,111

5/1/2009

9/1/2009

$

648,106

Detroit Road, Infrastructure, Streetscape, Parks & Landscaping

Detroit Detroit Detroit

Surface Parking

Detroit

st

e u

q e R Parking Deck

s

O N

Community Connectivity: We are within " mile to at least 10 basic Services. NA Brownfield Redevelopment: Major cleanup in compliance with ASTM 1903-97 Phase 2 has occurred. 5/1/2009

9/1/2009

$

1,300,000

Heat Island Effect Roof: We are replacing roof with PVC (SR SRI 79 or greater

5/31/2008

9/1/2009

$

900,000

Optimizing Energy Performance: We are meeting and exceeding ASHRAE 90.1 2004 5/31/2008 Enhanced Refrigeration Management: We are using refrigerant free of CFC’s and HCFC’s and compliant with LEED Guideline 5/31/2008 Measurement and Verification: We have enhanced electronic meters on electrical, gas and water services 5/31/2008 Building Reuse: We have reused all structural components or the building. Doing so has cost a premium to renovate this historical building NA

9/1/2009 9/1/2009

$

250,000

9/1/2009

$

200,000

NA

$

3,000,000

Controllability of lighting systems all rooms are on motion sensors and or timers

5/31/2008

9/1/2009

$

300,000

Detroit

Argonaut Building Basement Parking

NA

NA

$

570,000

Detroit

Conference Center - Completion of Perimeter Breakout Rooms

NA

NA

$

350,000

Detroit

Third Party Lease Space - Tenant Specific Build-out

NA

NA

$

4,592,350

Detroit

tt i m

Detroit Detroit

ub

Detroit Detroit Detroit Detroit

02262009

S

d e t

Submitted Requests - Not Approved

Route (Infrastructure Only)

NA

878 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency College for Creative Studies Detroit College for Creative Studies Detroit College for Creative Studies Detroit College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies College for Creative Studies

College for Creative Studies College for Creative Studies City of Bessemer City of Bessemer City of Bessemer City of Bessemer City of Bessemer City of Bessemer

Project Name

Alternative Transportation: Bike Storage is possible, quantity and location needs to be confirmed.

Project Description

Start Date

Expected Completion Date

Funding Request

LEED EB silver level ratings

NA

NA

$

600,000

Green Globe Rating

NA

NA

$

100,000

Energy Star Certification

NA

NA

$

25,000

$

6,000

$

250,000

NA

$

540,000

NA

$

132,000

D VE

Detroit

Alternative Transportation: Bike Storage is possible, quantity and location needs to be confirmed. Alternative Transportation: Changing Facility is possible by adding new shower room or arranging membership at New Center Fitness. NA Alternative Transportation: Low Emission Vehicles would need to be purchased and given priority parking. NA Heat Island Effect: Install vegetated roof to reduce heat absorption at the South Entry Canopy and Light Well Roof on 9th Floor. NA

Detroit

Innovative Waste Water Technology: This is a potential point but involves major cost NA

NA

$

1,000,000

Detroit

Commissioning Building System NA Green Power: A 2 year contract could be purchased from DTE for Green Power at 2 cents a KWH. NA Controllability of HVAC systems is possible but additional Thermostats and Box would be necessary to meet NA

NA

$

800,000

NA

$

225,000

NA

$

500,000

NA

NA

$

8,000,000

NA

NA

$

750,000

7/1/2009 7/1/2009 6/1/2009 7/1/2009 9/30/2009 8/1/2009

8/1/2009 10/1/2009 9/30/2009 10/30/2009 11/30/2009 11/30/2009

$ $ $ $ $ $

Detroit Detroit Detroit

T O

Detroit Detroit

Detroit Detroit Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer

Water System Upgrade Downtown Enhancer Blight Remediation Bluff View Park Upgrade Local Street Improvement Industrial Park Improvement

Summit Academy North

Huron Township

Summit Academy

Flat Rock, MI

City of St. Clair Shores St. Clair Shores

City of St. Clair Shores St. Clair Shores

02262009

t i m

-N

Upgrade and rehabilitate Kresge Ford Building: new HVAC system, including completion of DDC control implementation for energy cost control; LED lighting systems; replacement of existing roof with one incorporating solar panels and/or green roof; building envelope (curtain wall) reclad with energy efficient double clad facade as well as structural work to restore building. New Information Technology Infrastructure: integrated with system at Argonaut, including Voice 0ver IP for data, telephony and security. Upgrade municipal water system including enhanced regional connections, pressure reduction, repair elevated storage reservoir. Streetscape Residential & Commercial blight demolitions Upgrade structures, grounds and equipment Pave, repair local and major streets Lighting; Infrastructure extension, street improvements

e u

q e R

2,500,000 1,599,000 U.S. 2 750,000 250,000 825,000 2,000,000

5/9/2009

8/9/2009

$

367,000

building repair

replace exterior doors, replace gym floor, parking lot replacement, Exterior lighting, furnace replacements, add exit and apron, additional security cameras, carpet replacement replace exterior doors, epoxy gym floor, parking lot, repair, furnace replacements, additional security cameras, carpet replacement

5/9/2009

8/9/2009

$

109,000

Water System Reservoir

Improve water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows.

5/1/2009

7/1/2009

$

1,500,000 10 Mile and Harper

Residential Water Meter Replacement

Replace aged residential water meters that have outlived their useful life. The project will increase the accuracy of the amount of water sold to residential customers. 5/1/2009

12/1/2010

$

5,400,000 City wide

10 Mile Road Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

$

10 Mile Road Harper Avenue to I1,150,000 94

building repair

ub

S

City of St. Clair Shores St. Clair Shores

d e tt

s t s

P P A

O R NA

Route (Infrastructure Only)

Submitted Requests - Not Approved

4/15/2009

7/1/2009

879 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of St. Clair Shores St. Clair Shores

City of St. Clair Shores St. Clair Shores

City of St. Clair Shores St. Clair Shores

City of St. Clair Shores St. Clair Shores

City of St. Clair Shores St. Clair Shores

City of St. Clair Shores St. Clair Shores

Project Name

Project Description

Harper Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

9 Mile Road Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

9 Mile Road Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

Parkside Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

PP

12/1/2009

4/15/2009

Euclid Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

Bon Brae Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

s

City of East Grand Rapids

City of East Grand Rapids

O N

$

$

9 Mile Road Greater Mack to 1,150,000 Harper

$

9 Mile Road Greater Mack to 800,000 Harper

9/1/2009

$

Parkside Beaconsfield to 8 485,000 Mile

4/15/2009

9/1/2009

$

Euclid - Greater 455,000 Mack to Jefferson

5/1/2009

8/1/2009

$

Bon Brae - Harper 360,000 to B Street

11/1/2009

$

535,000

7/1/2009

e t t

5/1/2010

7/1/2009

7/1/2009

In 1989 the City of East Grand Rapids, with a DNR grant, purchased property to create a City Park that adjoins Reeds and Fisk Lakes. Prior to the purchase, the area was cleared and filled to develop condominiums. This park area drains storm water from two major roads into the adjoining lakes. The proposed project will restore the area with wetlands and woodlands that are native to this area. The restoration will help with cleaning the storm water runoff from the two roads prior to the water entering the lakes. The restoration will also help restore wildlife areas around both lakes. This restoration project is part of a lakefront park development project that is funded through a DNR Michigan Natural Resources Trust Fund grant ($490,000), a W. K. Kellogg Foundation Access to Recreation grant ($88,300) and a City match ($178,000). 6/1/2009

12/1/2009

O R

D VE

u q e

R d

Storm Water - Wetland & Woodland City of East Grand Rapids Restoration in Gilmore/Waterfront Park

Funding Request

City of East Grand Rapids Bonnell Hill Erosion Control Project

The Bonnell Hill Erosion Control Project will provide a new, lined open ditch with dams to diffuse storm water runoff from an entire neighborhood while controlling the soils and pollutants that currently flow into Reeds Lake. The existing open ditch is eroding; causing soils, gravel and road pollutants to flow directly into Reeds Lake during rain events. A new ditch will be constructed with a liner and dams that will stop the flow of soils from eroding from the hill and polluting Reeds Lake. 6/1/2009

10/1/2009

$

North Shore Sanitary Sewer Replacement City of East Grand Rapids Project

The North Shore Sanitary Sewer Replacement Project will replace an existing sanitary sewer main that is located beneath a wetland that drains to Fisk Lake. The existing sewer main is broken and allowing water and mud from the wetland to drain into the sewer line. Since the broken line is under the wetland, it is not possible to fix the line. While no sanitary sewage is flowing into the wetland at this time, there is concern that as the sewer main becomes blocked, this may happen in the future. The project will run a new sanitary sewer main around the wetland along a roadway in order to provide easier access for future maintenance and stop the flow of storm water and mud into the sanitary sewer system while avoiding future sanitary sewer spills into the wetland and Fisk Lake. 6/1/2009

9/1/2009

$

t i m

b u S

02262009

Route (Infrastructure Only)

Harper Avenue - 13 Mile to North City 2,540,000 Limit

A T

t s e

City of East Grand Rapids

Start Date

Expected Completion Date

Submitted Requests - Not Approved

The Bonnell Hill Erosion Control Project runs from the top of Bonnell Hill to the bottom adjoining Reeds 75,000 Lake.

501,000

880 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of East Grand Rapids

The City of East Grand Rapids Public Works Building is over 35 years old and needs to be remodeled and enlarged. The current building has no insulation and old, inefficient heating units. The City has budgeted $1.3 million dollars for this project. The City is seeking $300,000 to provide higher energy efficiency in the HVAC system, additional insulation, and the purchase of recycled building products in order to meet the requirements of the Leadership in Energy and Environment Development (LEED) Public Works Building Remodeling, Expansion certification. This project will lower the energy useage for this building while providing City of East Grand Rapids and Energy Efficiency Project a market for recycled building products. 8/1/2009

City of East Grand Rapids

City of East Grand Rapids Blodgett Hospital Water Main Upgrade

Blodgett Hospital has begun a building addition to the hospital, that when completed, will add 400 new jobs. A City Water Reliability Study has revealed that a larger, new water line is needed to service the hospital and their expansion of services. This new water line will help to ensure the success of the building project, expansion of hospital services, and 400 new jobs. 6/1/2010

Police/Emergency/Medical Hybrid Patrol City of East Grand Rapids Vehicle

The purchase of a Police/Emergency Medical Hybrid midsized SUV Patrol Vehicle to replace an existing Ford Crown Victoria vehicle. This vehicle is used 24/7 to patrol the streets of East Grand Rapids for police patrol and emergency medical response. The difference in Miles-Per-Gallon between the vehicles is over 20 mpg. This will save the City in gasoline costs while reducing the carbon emissions. If this is successful, the City will look into purchasing other hybrid vehicles to replace the existing fleet of Crown Victoria’s. 7/1/2009

City of East Grand Rapids

Expected Completion Date

P P A

O R 1/1/2010

Funding Request

Route (Infrastructure Only)

D VE $

1,600,000

Plymouth Road from Franklin St. to 400,000 Wealthy St.

9/1/2010

$

8/1/2009

$

35,000

Through a $316,500 grant from the Wege Foundation, a Solar Panel Demonstration Project was established by placing solar panels on the roof of the new City Community Center. The Project also created a live energy data site on the City's website (www.eastgr.org) and at a kiosk at the East Grand Rapids Library. This site educates the public with live reports of the energy being produced by the solar panels and general information about solar energy. The gift from the Wege Foundation provides 16.37 kWDC of power and will mitigate 1,029,000 pounds of CO2 over the life of the solar panels, which is the equivalent of taking 100 cars off of the road. The original design of the Solar Panel Demonstration Project provided for double the number of solar panels that are currently on the Community Center roof. This request is to fund the additional solar panels that can be plugged into the existing infrastructure in order to produce clean energy. 5/1/2009

9/1/2009

$

330,000

Purchase an EPOKE de-icing system to improve the safety of our roads and to reduce the amount of salt used by 33% which will also reduce the amount of salt run off that indirectly discharges into Lake St. Clair. 7/1/2009

1/1/2010

$

225,000 19700 Pleasant

1/1/2010

$

350,000 19700 Pleasant

T O

s t s

-N

e u

City of East Grand Rapids

d e t

City of East Grand Rapids Solar Panel Demonstration Project

City of St. Clair Shores St. Clair Shores

tt i m

Streets EPOKE Salt Truck

q e R

City of St. Clair Shores St. Clair Shores

Sewer Vac Con Truck

Purchase a Sewer Vac Con Truck to improve the regular maintenance on storm sewer catch basins and decrease the contaminants that discharge directly to Lake St. Clair. This will allow the city to double our efforts to meet the NPDES Phase 2 requirements of the MDEQ. 7/1/2009

City of St. Clair Shores St. Clair Shores

Sewer Televise & Clean 1/10th of City

Clean and televise sanitary sewers in the City to monitor and repair structural deficiencies in the system to reduce back-ups and ground water infiltration.

5/1/2009

8/1/2009

$

600,000 19700 Pleasant

City of St. Clair Shores St. Clair Shores

Sewer Root Treatment

To retard tree root infiltration into the sanitary sewer system of an aging neighborhood that will slow the structural damage and back-ups caused by the trees. 5/1/2009

8/1/2009

$

City of St. Clair Shores St. Clair Shores

Window Replacement PD

R/R existing windows and exterior doors w/ new energy efficient replacements

7/1/2009

8/1/2009

$

City of St. Clair Shores St. Clair Shores

Mobile Command Post

Emergency Mobile Command Center

7/1/2009

8/1/2009

$

150,000 19700 Pleasant 27665 Jefferson 80,000 Ave 27665 Jefferson 155,000 Ave

b u S

02262009

Submitted Requests - Not Approved

881 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

City of St. Clair Shores St. Clair Shores

Training Room renovation at Central Fire

City of St. Clair Shores St. Clair Shores

Renovation of South Fire Station

City of St. Clair Shores St. Clair Shores

Fire Engine replacement

City of Ypsilanti

City of Ypsilanti

City of Ypsilanti

City of Ypsilanti

Start Date

Expected Completion Date

Renovate our training room from 260 square feet to 740 square feet to allow us the ability and space (according to International Building Codes - 20 square feet per student), which will us the capability to meet code requirements for our own people and also the ability to train other groups (CERT, CPR, etc.) Renovation of our 52-year old South Fire Station office and exterior, updating siding and windows to be more energy efficient. To replace our 1987 Sutphen engine with a new engine with rescue capabilities/equipment.

7/1/2009

10/1/2009

7/1/2009

10/1/2009

7/1/2009

1/1/2010

Funding Request

D VE $

75,000 26700 Harper 23815 Greater 75,000 Mack 23815 Greater 500,000 Mack

1 year fom start date

$

870,000

O R

$ $

1 S. Huron St., Ypsilanti, MI 48197 City Hall Energy Efficiency upgrades

Upgrades through existing lighting; convert T12 fixtures to T8 lamps and electronic ballasts: Retrofitting of water conservation methods; existing flushometer type toilets will be replaced with new toilets that uses less water per flush, urinal flushmeters will be retrofitted to use less water per flush, existing faucets use will be replaced with lower flow aerators: conversion, consolidation of HVAC, tune-up and re-balance existing HVAC systems, unitary equipment replacement, building envelope tune-up; add weatherstriping, door sweeps to existing exterior doors, seal intersection of the 90 days after roof and wall with a polyurethane spray foam sealant: temperature controls upgrade funds are and installation of emergency back-up power generator released

505 W. Michigan Ave., Ypsilanti, MI 48197

Upgrades through existing lighting; convert T12 fixtures to T8 lamps and electronic ballasts: , retrofitting of water conservation methods;existing flushometer type toilets will be replaced with new toilets that uses less water per flush, urinal flushmeters will be retrofitted to use less water per flush, existing faucets will be replaced with lower flow aerators: conversion, consolidation of HVAC, tune-up and re-balance existing HVAC systems, unitary equipment replacement, building envelope tune-up; add weatherstriping, door sweeps to existing exterior doors, seal intersection of the roof 90 days after and wall with a polyurethane spray foam sealant: temperature: temperature controls funds are upgrade released

1 year from start date

$

530,000

Upgrades through existing lighting; convert T12 fixtures to T8 lamps and electronic ballasts: retrofitting of water conservation methods; existing flushometer type toilets will be replaced with new toilets that uses less water per flush, urinal flushmeters will be retrofitted to use less water per flush, existing faucets will be replaced with lower flow aerators:conversion, consolidation of HVAC, tune-up and re-balance existing HVAC systems, replacement of boiler: building envelope tune-up, window replacement; install new Low -E window system, add weatherstriping, door sweeps to 90 days after existing exterior doors, seal intersection of the roof and wall with a polyurethane spray funds are foam sealant: unitary equipment replacement, temperature controls upgrade released

1 year from start date

$

470,000

1 year fom start date

$

320,000

525 W. Michigan Ave., Ypsilanti, MI 48197

02262009

N s

Police Station Energy Efficiency Upgrades

t s e

u q e

R d

i m

e t tt

Fire Station Energy Efficiency Upgrades

Upgrades through existing lighting, retrofitting of water conservation methods; existing flushometer type toilets will be replaced with new toilets that uses less water, urinal flushmeters will be retrofitted to use less water, existing faucets will be replaced with lower flow aerators: tune-up and re-balance existing HVAC systems, building envelope tune-up;add weatherstriping, door sweeps to existing exterior doors, seal 90 days after intersection of the roof and wall with a polyurethane spray foam sealant: temperature funds are released Energy Efficiency Upgrades for Senior Center controls upgrade,

b u S

1015 N. Congress St., Ypsilanti, MI 48197

T O

P P A

Submitted Requests - Not Approved

Route (Infrastructure Only)

882 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Start Date

Upgrades through existing lighting; convert T12 fixtures to T8 lamps and electronic ballasts: retrofitting of water conservation methods; existing flushometer type toilets will be replaced with new toilets that uses less water per flush, urinal flushmeters will be retrofitted to use les water per flush, existing faucets will be replaced with lower flow aerators: tune-up and re-balance existing HVAC systems, window replacement, building envelope tune-up; add weatherstriping, door sweeps to existing exterior 90 days after doors, seal intersection of the roof and wall with a polyurethane spray foam sealant: funds are temperature controls upgrade, released

City of Ypsilanti

591 Armstrong Dr., Ypsilanti, MI 48197

City of Ypsilanti

Upgrades through existing lighting;convert T12 fixtures to T8 lamps and electronic ballasts: retrofitting of water conservation methods; existing flushometer type toilets will be replaced with new toilets that uses less water per flush, urinal flushmeters will be retrofitted to use less water per flush, existing faucets will be replaced with lower flow aerators tune-up and re-balance existing HVAC systems, unitary equipment replacement, building envelope tune-up; add weatherstriping, door sweeps to existing 90 days after 76 N. Huron St., Ypsilanti, Energy Efficiency Upgrades for Riverside Arts exterior doors, seal intesection of the roof and wall with a polyurethane spray foam funds are MI 48197 Center sealant temperature controls upgrade released

City of Ypsilanti

Upgrades through existing lighting;convert T12 fixtures to T8 lamps and electronic ballasts: retrofitting of water conservation methods; existing flushometer type toilets will be replaced with new toilets, urinal flushmeters will be retrofitted, existing faucets 90 days after will be replaced with lower flow aerators unitary equipment replacement, infrared funds are Energy Efficiency Upgrades for Freighthouse heater retrofit released

City of Ypsilanti

City of Ypsilanti

Funding Request

D VE

1 year fom start date

$

310,000

1 year fom start date

$

160,000

1 year from start date

$

90,000

975 N. Congress St., Ypsilanti, MI 48197

Energy Efficiency Upgrades for Rutherford Pool

Upgrades through existing lighting, retrofitting of water conservation methods; existing flushometer type toilets willl be replaced with new toilets that uses less water per flush urinal flushmeters will be retrofitted to use less water per flush, existing faucets will be replaced with lower flow aerators building envelope improvements;add 90 days after weatherstriping, door sweeps to existing exterior doors, seal intersection of the roof funds are and wall with a polyurethane spray foam sealant released

1 year from start date

$

60,000

14 W. Forest Ave., Ypsilanti, MI 48197

Upgrades through existing lighting;convert T12 fixtures to T8 lamps and electronic ballasts: retrofitting of water conservation methods; existing flushometer type toilets use will be replaced with new toilets that uses less water per flush, urinal flushmeters will be retrofitted to use les water per flush, existing faucets will be replaced with lower flow aerators conversion, consolidation installation of HVAC, tune-up and rebalance existing HVAC systems, unitary equipment replacement, building envelope tune-up; add weatherstriping, door sweeps to existing exterior doors, seal intersection of the roof and wall with a polyurethane spray foam sealant temperature controls 90 days after Energy Efficiency Upgrades forDepartment of upgrade, window replacement, complete building and floor plan renovation. infrared funds are Public Services heater retrofit, installation of emergency back-up power generator released

1 year from start date

$

220,000

6 months

$

6,000,000

100 Market St.

Energy Efficiency Upgrades for Parkridge Community Center

Project Description

Expected Completion Date

T O

d e tt

t i m

b u S

s t s

O R

P P A

-N

e u

q e R

City of Ypsilanti

City of Ypsilanti - Michigan Avenue between Water St Environmental Remediation Clean-upfor and Park Street Water Street Redevelopment

Demolition of abandoned buildings, clean-up of soil contaminated with PCBs, solvents fuels, and metals, and groundwater contaminant migration control to allow mixed-use, renaissance redevelopment and greenspace creation on 38-acre site adjoining the When funds are Huron River and downtown Ypsilanti available

City of Ypsilanti

City of Ypsilanti Mansfield St between Westmoorland and Congress Streets

Water Main Replacement

Replacement of 50+ year old water main with ductile iron that meets current requirements

90 days after funds are released

1 year fom start date

$

315,000

City of Ypsilanti

City of Ypsilanti - E. Cross St between River St and Prospect Ave Water Main Replacement

Replacement of 50+ year old water main with ductile iron that meets current requirements

90 days after funds are released

1 year fom start date

$

482,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

883 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ypsilanti Village of South Rockwood

City of Ypsilanti - W. Cross St between Washtenaw Ave and Wallace Village of South Rockwood

Village of South Rockwood Village of South Rockwood

Village of South Rockwood Village of South Rockwood

Village of South Rockwood Village of South Rockwood

Village of South Rockwood Village of South Rockwood

City of River Rouge

Project Name

Project Description

Start Date

Carleton-Rockwood Sanitary Sewer Lining

Funding Request

Route (Infrastructure Only)

90 days after funds are released

1 year fom start date

$

300,000

9/9/2009

3/10/2009

$

South Huron River 250,000 Drive

Upgrade existing sanitary sewer to handle sanitary sewer flows from the Village of South Rockwood. Proposed method of upgrade of the sewer is to convert it to a 10inch and 12-inch force main. 9/9/2009 Reline existing sanitary sewer line along with sanitary sewer leads to control inflow an infiltration into the system. 7/9/2009

3/10/2009

Replacement of 50+ year old water main with ductile iron that meets current Water Main Replacement requirements Replace existing sanitary sewer pump station with new precast wet well, pumps, South Rockwood Pump Station Improvements control building and removal of the old pump station

Swallow Drive Sanitary Sewer Upgrade

Expected Completion Date

P P A

O R 9/9/2009

D VE $

$

200,000 Swallow Drive Carleton250,000 Rockwood Road

Village Street Upgrades

Upgrade existing undersized water mains within the Village limits. As part of the upgrade of the small mains install new gate valves, fire hydrants, and house services. 10/9/2009 Remove and replacement of existing subdivision roads. Upgrade roads to current standards along with drainage improvements. 10/9/2009

River Rouge

Great Lakes Avenue Road Reconstruction

Removal and replacement of existing road pavement, storm sewer, and water main. Update all sanitary sewer manholes to reduce inflow and infiltration.

7/9/2009

12/9/2009

$

Great Lakes 1,200,000 Avenue

Huron Township

Huron Charter Township (Wayne County)

Replacement of approximately 2.5 miles of existing 12-inch water main along the north side of the road. This will include new gate valves and wells, fire hydrants, and Will Carleton Road Water Main Replacement any house services. 8/9/2009

4/10/2009

$

3,000,000 Will Carleton Road

Huron Township

Huron Charter Township (Wayne County)

Clark Road Water Main Extension

Extend the existing 12-inch water main along Clark Road and Ash Road to complete existing water main loop. 8/9/2009

12/9/2009

$

250,000 Clark Road

Huron Charter Township (Wayne County)

Pennsylvania Road Water Main Extension

Extend the existing 12-inch water main along the south side of Pennsylvania Road under the existing CSX Railroad in order to complete the loop located along Pennsylvania Road.

10/9/2009

4/10/2009

$

350,000 Pennsylvania Road

Huron Township

Huron Charter Township (Wayne County)

Extension of existing water main with 12-inch main to create a looped system along the Will Carleton Road area. This will eliminate a long dead water main and make the Lower Huron Metropark Water Main Extension water system more reliable. 10/9/2009

6/10/2009

$

Huron Township

Huron Charter Township (Wayne County)

Huron River Drive Water Main Replacement Project

Reline existing 8-inch water main within the Downtown New Boston area using CIPP developed for water main use. This project would include new gate valves and wells, and new fire hydrants. 6/9/2009

11/9/2009

$

New water main construction along Inkster Road from Pennsylvania Road to Huron River Drive. This project would consist of 12-inch water along with 12-inch gate valves and wells and fire hydrants.

7/10/2009

$

Huron Township

Water System Upgrades

Huron Township

Huron Charter Township (Wayne County)

Huron Township

Huron Charter Township (Wayne County)

Huron Township

Huron Charter Township (Wayne County)

tt i m

New Boston Sidewalk Program

ub

S

d e t

Inkster Road Water Main Extension Project

New Boston Gravel Road Paving Program

Chesterfield Township Chesterfield Township

Municipal Pedestrian Bridge

City of Auburn

City of Auburn

Auburn Road Repairs

City of Auburn

City of Auburn

City of Dearborn

DEARBORN

02262009

T O

s t s

-N

e u

q e R

11/9/2009

Construction of new concrete sidewalk within the limits of the Village of New Boston. This would include the paving of the street intersections in order to allow for those in wheelchairs to move about the Village. 8/9/2009

Pave existing gravel roads within the Village of New Boston including new storm sewer and drive approaches

8/9/2009

Construct a pedestrian bridge on the municipal site to provide access to the adjacent historical site 9/1/2009 Auburn Road is one of the Major Street coming into the downtown district of the City is in need of complete rehabilitation. 6/1/2009

This project would replace an old 4" watermain with an 8" water main. Replacing this Moll Street Water Main Replacment main would improve fire flows to the Day Care and Apartments located on this street. 8/1/2009 S.B. SOUTHFIELD SERVICE DR-MICHIGAN AVE TO FORD RD STREET RESURFACING 8/1/2009

Submitted Requests - Not Approved

5/10/2009

$

8/10/2009

$

Various Streets In 2,500,000 The Village Various Streets In 3,000,000 The Village

Lower Huron 2,000,000 Metropark

650,000 Huron River Drive

4,500,000 Inkster Road

$

Various New Boston Subdivision 875,000 Streets

11/9/2009

$

Various New Boston Subdivision 2,850,000 Streets

11/15/2009

$

Municipal Offices, 200,000 Sugar Bush Road

6/30/2009

$

60,000 Auburn Road

10/31/2009

$

80,000 Moll Street

8/30/2010

$

11/9/2009

481,000

884 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn City of Dearborn

DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN DEARBORN

City of Dearborn

DEARBORN

City of Dearborn City of Dearborn

DEARBORN DEARBORN

City of Flat Rock

Project Name N.B.SOUTHFIELD SERVICE DR-MICHIGAN AVE TO PAUL STREET MILLER-WAREEN TO TIREMAN CARLYSLE- TELEGRAPH TO OUTER DR SCHLAFF- MICHIGAN TO CHASE PROSPECT-MAPLE TO IRVING VERNOR-INDUSTRIAL TO RIVERSIDE CHASE-MICHIGAN TO FORD SCHLAFF-PROSPECT TO MICHIGAN INDUSTRIAL-RIVERSIDE TO VERNOR MONROE: DARTMOUTH TO OUTER DR GULLEY ROAD-DARTMOUTH TO PRINCETON(easterly half-City limit)* GULLEY ROAD-AVONDALE TO FORD ROAD(easterly half-City limit)* CHERRY HILL -GULLEY TO TELEGRAPH

Project Description

Start Date

Expected Completion Date

STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING STREET RESURFACING

8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009

STREET RESURFACING STREET RESURFACING STREET RESURFACING

8/1/2009 8/1/2009

Project consists of the removal and replacement of the existing water main along Evergreen St., between Gibraltar Rd and Seneca St., with 12" DI water main including hydrants, valves and appurtenances. 5/9/2009

T O

$ $ $ $ $ $ $ $ $ $

640,000 400,000 1,600,000 330,000 150,000 700,000 700,000 240,000 857,000 702,000

11/30/2010

$

311,600

11/30/2010 11/30/2010

$ $

746,000 703,000

11/9/2009

$

360,000

O R

P P A 8/1/2009

8/30/2010 8/30/2010 8/30/2010 8/30/2010 8/30/2010 8/30/2010 11/30/2010 11/30/2010 11/30/2010 11/30/2010

Funding Request

D VE

City of Flat Rock

Evergreen Street- Water Main Replacement

City of Gibraltar

Middle Gibraltar Rd. Water Main Replacement Project consists of the removal and replacement of the existing water main between - W. Jefferson Ave. to Meadow Lands W. Jefferson Ave. and the Meadow Lands Manufactured Home Park with an 12" wate Manufactured Home Park main including hydrants, valves and appurtenances. 5/9/2009

11/9/2009

$

728,000

City of Gibraltar

Project consists of the removal and replacement of the existing water main between West Jefferson Rd. Water Main Replacement - Vreeland Road and Middle Gibraltar Rd with an 12" water main including hydrants, Vreeland Road to Middle Gibraltar Rd. valves and appurtenances.

5/9/2009

11/9/2009

$

1,180,000

City of Gibraltar

City of Gibraltar

Project consists of the removal and replacement of the existing water main between West Jefferson Rd. Water Main Replacement - Middle Gibraltar Rd and South Gibraltar Rd with an 12" water main including hydrants Middle Gibraltar Rd. to South Gibraltar Rd. valves and appurtenances. 5/9/2009

11/9/2009

$

850,000

City of Gibraltar

City of Gibraltar

Pointe Dr. Water Main Replacement - E. Pointe Dr. Loop

Project consists of the removal and replacement of the existing water main in the E. Pointe Dr. Loop with an 8" water main including hydrants, valves and appurtenances. 5/9/2009

11/9/2009

$

588,000

Project consists of the removal and replacement of the existing water main between Adams Dr. and the Cul-de-sac with an 8" water main including hydrants, valves and appurtenances. 5/9/2009

11/9/2009

$

770,000

5/9/2009

11/9/2009

$

712,000

5/9/2009

11/9/2009

$

1,000,000

12/31/2009

$

4,000,000

12/31/2009

$

4,000,000

City of Gibraltar

City of Gibraltar

City of Gibraltar

City of Gibraltar

City of Gibraltar

City of Gibraltar

City of Gibraltar

City of Gibraltar

City of Hancock

Adams Twp., Portage Twp, and City of Houghton

City of Hancock

City of Hancock

City of Hancock

City of Hancock

City of Hancock City of Hancock City of Hancock

City of Hancock City of Hancock City of Hancock

City of Hancock

City of Hancock

u S

02262009

s t s

-N

e u

eq

R d

Island Dr.Water Main Replacement - Adams Dr. to Cul-de-sac

Project consists of the removal and replacement of the existing water main between Young Dr. Water Main Replacement -Triangle Triangle Dr. and Worth Ave with an 8" water main including hydrants, valves and Dr. to Worth Ave. appurtenances. Project consists of bridge reconstruction including Demolition, Complete Middle Gibraltar Rd. Bridge Reconstruction reconstruction of new abutments, beams, railings, deck and guardrails etc.

e t t

it

bm

6/30/2010

$

4,000,000

Energy Conservation Business Incubator Historic Preservation

Replace up to 23,000 lineal feet of 75 year old water main pipe that provides drinking water and fire protection to 6 municipalities. 7/9/2009 Relign and replace 80 year old clay sewer pipe in the City of Hancock that is causing high levels of infiltration. 8/1/2009 Replace 19,000 linear feet of 80 year old water main to improve realiability and fire protection. 9/1/2009 Replace some street lights with new lighting and replace windows, insulate and install new boilers in City buildings. 7/1/2009 Renovate 2 vacant downtown buildings into business incubators 9/1/2009 Restore Downtown storefront facades to historic condition 10/1/2009

12/31/2009 6/30/2010 6/30/2010

$ $ $

500,000 2,500,000 500,000

Recreation

Develop 11,000 linear feet of walking trails in the City and park improvements.

12/31/2009

$

470,000

Regional Transmission Project Sanitary Sewer Renovation Project

Water System Upgrade

Submitted Requests - Not Approved

7/1/2009

Route (Infrastructure Only)

885 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Livonia

City of Livonia

City of Livonia

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Livonia, Michigan

Replacement (standard) of HVAC system at Livonia City Hall

The Livonia City Hall, built more than 30 years ago, has a failing heating/cooling system impacting hundreds of employees and visitors daily. Replacing this system wil improve energy usage and efficiency. asap

Within 12 months after start of construction

$

4,700,000

Livonia, Michigan

Replacement (geothermal) of HVAC system at Livonia City Hall

The Livonia City Hall, built more than 30 years ago, has a failing heating/cooling system impacting hundreds of employees and visitors daily. Replacing this system with a geothermal heating/cooling system will improve energy usage and efficiency.

12 months after start of construction

$

6,300,000

Livonia, Michigan

Geothermal heating and cooling system for Livonia Housing Commission office.

Retrofit closed Livonia Fire Station with geothermal heating/cooling system to replace failed boiler unit. This site will be used as offices for City's Housing Commission to provide Federal programs including serving low-income residents. 4/1/2009

3 months

$

70,000

7/1/2008 5/15/2010

4 months after start of construction 10/15/2011

$ $

1,000,000 1,500,000

July, 2009

Dec. 2010

$

875,000

July, 2009

July, 2010

$

650,000

4,800,000

City of Livonia City of Wayne

Livonia, Michigan City of Wayne

within 180 days

P P A

O R

D VE

Replace water mains Municipal Parking Lot - Sims

Replace aging water mains at various locations across the City. Parking Lot Improvement/ Storm Water Management

Denton Township

Denton Township, Roscommon County

Denton WWTP Repair

Houghton Lake Sewer Authority: Wastewater Treatment Lagoon Improvements to meet phosphorus discharge limits to protect Houghton Lake. Includes additional phosphorus removal processes and upgrades to existing facilities.

Denton Township

Denton/Roscommon Townships, Roscommon County

Pump Station

Houghton Lake Sewer Authority: Pump Station Repair

State of Michigan - Government Reorganization Project

EDSI Consulting proposes to perform a comprehensive review of the state government structure. The objectives of this review are to: A) Ensure key state services are provided as efficiently as possible while maintaining or improving upon service levels, B) Identify costs and services that should be eliminated, C) Identify new services that should be provided to facilitate job creation and economic diversification, D) Identify the most efficient state organization structure that will enable objectives A - C. EDSI proposes to use the following process to conduct this review: 1. Define financial, organizational, economic and strategic objectives. 2. Review current organizations, services, cost structures and performance levels. 3. Create an optimal structure for the state government. 4. Create an implementation plan to convert the existing government to the new structure. 5. (Phase II) Manage the reorganization process. 3/1/2009

Phase 1 - 9/1/2009 Phase 2 - 3/1/2010 $

EDSI Consulting proposes to perform a workforce readiness analysis to ensure film studios moving to Michigan have a work-ready workforce. This project has the following benefits: A) Time to re-employment for Michigan's unemployed citizens will be reduced B) State tax revenue will increase C) Studios will be more likely to relocate to Michigan knowing the state has a studio-ready workforce D) The Michigan Film Office's overload will be relieved. EDSI proposes to use the following process: 1) Identify key positions within companies relocating to Michigan 2) Perform a detailed job skill analysis for each key position 3) Create curriculum for key positions 4) Assess Michigan-based applicants for potential positions 5) Create a training plan for all applicants 6) Work with local community colleges to ensure the training is implemented quickly, efficiently and effectively. If necessary, EDSI will provide placement services connecting trained applicants to open positions. 3/1/2009

Steps 1-5 completed by 7/1/2009 Step 6 completed by 10/1/2009 Placement services would be ongoing

$

600,000

We hope to purchase and/or restore conservation easements in river flood plain zones. Non-motorized path projects are ready for implementation in these zones. The easements are required in order for the projects to move forward. Impact and Engineering studies have been completed.

9/30/2010

$

750,000

s t s

T O

-N

Route (Infrastructure Only)

e u

Educational Data Systems, Inc.

State Government

itt

Educational Data Systems, Inc.

Flint Township

u S Statewide

d e t

bm

Michigan Film Office - Workforce Readiness Project

Restoration and Purchase of Conservation Charter Township of Flint Easements in River Flood Zones

02262009

q e R

Submitted Requests - Not Approved

886 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Forest Island Recycling

Hamtramck

Forest Island Recycling

Forest Island Recycling, Inc. (FIR) has a long term “green initiative” and operates as a fully licensed Type A Solid Waste Transfer Station intercepting recyclable material as a dirty material recovery facility. We offer alternative recycling options for waste generators from the Industrial and Retail Industries. Our entire project consists of four phases that requires total investment of up $9,000,000 through 2011. To date, we have completed phase 1 and have invested $1,350,000. We are now requesting financial assistance of $1,500,000 for phase 2 which requires a total investment of $2,000,000 for which we have committed equity capital of $500,000. This “shovel ready” phase 2 project will provide both immediate temporary construction work and permanent employment of up to an additional 100 employees from a low income/urban community which suffers from an unemployment rate of 14% with 24% of households living below the poverty line. This investment will allow FIR greater recovery of recyclable materials (up to 75%) from a “Single Solid Waste Stream” which provides numerous environmental benefits including extending the life of our Mi 2/9/2009

Grand Rapids Township

Grand Rapids Charter Township, Kent County

Township Hall Roof Replacement

Replace the current 20 year old Township Hall asphalt shingled roof with an insulated recyclable metal roof. April, 2009

Township Hall Parking Lot Replacement Sanitary Sewer Lift Station Replacement/Upgrade

Replacre our Township Hall asphalt parking lot with a porous material that allows the absorption naturally and filtering of storm water instead of directing it to the ajoining stream and wetlands directly from the parking lot. The replaced parking lot will improve down stream water quality and reduce the volume created by rain waters that damage downstream areas. May, 2009 Removal and replacement of existing sanitary sewer lift station and force main at the intersection of Allen Road and Hall Road 7/9/2009

Grand Rapids Township

Grand Rapids Charter Township, Kent County

City of Woodhaven

City of Woodhaven

T O

s t s

-N

Hillsdale County Road Commission Hillsdale County Road Commission Hillsdale County Road Commission Hillsdale County Road Commission Hillsdale County Road Commission

i m

E. Bacon Road

b u S

Litchfield Road

Camden, Ransom & Woodbridge Townships Adams, Fayette & Wheatland Townships

North Adams Road

Hillsdale Township

Mechanic Road

Woodbridge Township Litchfield Township

02262009

R d

e t tt

Montgomery Road

95,000

Fall, 2009

$

74,000

12/9/2009

$

Allen Road and Hall 275,000 Road

530,000 Hall Road

Street Sign Replacement Program

Moscow Road

$

$

Remove existing street signs and posts. Replace signs with new highly reflective signs and posts. New signage will help improve the safety of the traveling public in reducing possible rear-end accidents by drivers who could not see the existing street signs. 10/9/2009

Moscow Township Adams, Hillsdale & Wheatland Townships Litchfield, Moscow & Scipio Townships

Fall, 2009

4/10/2009

Hall Road Street Lighting

Woodhaven Department of Public Services Parking and Storage Area Improvements

2,000,000 tbd

10/9/2009

City of Woodhaven

City of Woodhaven

$

$

City of Woodhaven

City of Woodhaven Hillsdale County Road Commission Hillsdale County Road Commission Hillsdale County Road Commission

5/9/2009

4/10/2009

Storm Sewer Pump Stations

City of Woodhaven

D VE

9/9/2009

City of Woodhaven

e u

Funding Request

Route (Infrastructure Only)

Various Locations Within The City 450,000 Limits

City of Woodhaven

City of Woodhaven

O R

P P A

Installation of three (3) storm sewer pump stations within the City of Woodhaven to help eliminate potential flooding issues of streets and property. Installation of new street lighting and conduit to replace existing outdated facilities. New lighting will eliminate any dead areas along the roadway.

eq

Expected Completion Date

Remove and replace existing gravel parking and storage area of the DPW facility. This shall include the upgrading of the existing storm sewer and paving of the storage area and visitors parking areas. 9/9/2009 Mill & asphalt overlay on 4.11 miles of Moscow Road from Sterling Road to the Jackson County Line 8/1/2009 Mill & asphalt overlay on 11.07 miles of E. Bacon Road from city of Hillsdale to Waldron Road 8/1/2009 Mill & asphalt overlay on 13.54 miles of Litchfield Road from Branch County Line to US-12. 8/1/2009

Various Locations Within The City 35,000 Limits

5/10/2009

$

4/10/2009

$

600,000 Van Horn Road

10/15/2009

$

935,000 Moscow Road

10/15/2009

$

2,440,000 E. Bacon Road

10/15/2009

$

3,080,000 Litchfield Road

8/1/2009

10/15/2009

$

2,220,000 Montgomery Road

8/15/2009

11/15/2009

$

3,500,000 North Adams Road

5/15/2009

9/15/2009

$

665,000 Mechanic Road

Montgomery Road

Mill & asphalt overlay on 10.08 miles of Montgomery Road from M-49 to M-99. Pulverize & asphalt resurface 13.94 miles of North Adams Road from the village of Jonesville to US-127. Widen, reconstruct & asphalt resurface Mechanic Road from Bunn Road to Lake Wilson Road - 0.69 mi. Replace bridge superstructure on Montgomery Road over the East Fork of the West Branch of the St. Joseph of Maumee River. Posting = 20 tons.

10/1/2009

5/30/2009

$

450,000 Montgomery Road

Litchfield Road

Replace bridge on Litchfield Road over Sand Creek. Posting = 28 tons.

10/1/2009

6/30/2009

$

750,000 Litchfield Road

Submitted Requests - Not Approved

887 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Hillsdale County Road Commission Cambria Township

Markey Township

New Center Community Mental Health Services

Markey Township, Roscommon County

Highland Park

Project Name

Expected Completion Date

Hillsdale Salt Building

Project Description Start Date Replace wooden walls on salt building at the county road commission's main complex in Hillsdale 9/1/2009

11/30/2009

Markey WWTP Repair

Houghton Lake Sewer Authority: Wastewater Treatment Lagoon Liner Repair and Irrigation System upgrade. Liner repair is needed to mitigate potential groundwater impact. Project has been under review in a Corrective Action Plan submitted to MDEQ. Irrigation upgreade needed to comply with permit requirements and meet the CAP requirements. July, 2009

July, 2010

New Center Training Center Phase Two

New Center Training Center Phase Two is the Smart Logistics and Warehouse Technology component of the New Center Training Center facility. (New Center Training Center Phase One is complete, is a computer-based training center, and comprises the second floor of the training facility.) Located on the first floor of the training facility, funding is sought for the completion of this second phase of the center. The initial focus will be the establishment of the warehouse skills training area. This will establish a working warehouse that will provide a real world environment where students will gain practical, hands-on skills that can be used in a future career. Students will be responsible for actually completing the order fulfillment process of ordering, storing, and delivering a wide range of materials to New Center Community Mental Health Services as to the facilities of other businesses and agencies with which the agency develops delivery partnerships. There will be a warehouse office-the communication hub of the Phase Two facility--where calls, orders, and deliveries are processed. Specific warehouse management software created by the New Center 4/1/2009

Funding Request $

250,000

D VE $

3,200,000

8/31/2009

$

1,566,849

A feasibility study to determine whether a commercial community digester project can be constructed and operated in the Metro Detroit area in the State of Michigan will be conducted by NE BioFuels LLC. Metro Detroit area, like other high density population centers in the country has high concentrations of organic waste production, with large quantities of waste from sewage treatment facilities, food processing facilities, restaurants and large entertainment and exhibition centers. These waste streams are usually land applied or disposed off in a landfill. These waste streams can be processed in anaerobic digesters to produce biogas which is renewable fuel gas and crop fertilizers. Historically, the utilization of anaerobic digesters in urban or large metropolitan settings have not been adopted in the United States due to feedstock availability concerns, lack of knowledge about the process, concerns about collection of wastes, low cost of natural gas and an absence governmental encouragement including lack of regulations and incentives. An extensive feasibility study of the Project is required that will ensure the long term availability of the feedstock and offtakImmediately

9 months after start date

$

500,000

NOVI Energy is developing a Complete Mix Anaerobic Digester project. This Project, Fremont Community Digester is being developed in partnership with Gerber Products Company and the Fremont Cooperative Produce Company. The Fremont plant will be capable of accepting manure and other farm residues, pre- and post-consumer food residuals, ethanol production byproducts, and industrial glycerin and alcohols. The plant will have the capacity to process approximately 350 ton/day of organic feedstock material to produce biomethane (a renewable fuel gas), liquid crop nutrients (fertilizers), compost and recovered water. This is a waste to energy project and will eliminate the release of 55,000 tons per year of equivalent CO2, and bring substantial improvement to the quality of regional water. Immediately

14 months from start of construction

$

18,500,000

T O

s t s

O R

Route (Infrastructure Only)

P P A

-N

e u

d e t

NOVI Energy BioFuels Detroit Metropolitan Area, Feasibility Study for a Digester Facility in LLC Michigan Metro Detroit in Michigan

itt

NOVI Energy LLC

S

Fremont, Michigan

02262009

m b u

Fremont Community Digester

q e R

Submitted Requests - Not Approved

888 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

NOVI Energy LLC

NOVI Energy LLC

Bad Axe, Michigan

Newberry, Michigan

Project Name

Project Description

Expected Completion Date

Start Date

Huron County Community Digester

NOVI Energy is developing a Complete Mix Anaerobic Digester projec near Bad Axe, MI. This Project, Huron County Community Digester is being developed in partnership with area dairy and beef cattle operations and other regional industrials. The plant will be capable of accepting manure and other farm residues, pre- and post-consumer food residuals, ethanol production byproducts, and industrial glycerin and alcohols. The plant will have the capacity to process approximately 550 tons/day of organic feedstock material to produce biomethane (a renewable fuel gas), liquid crop nutrients (fertilizers), compost and recovered water. This is a waste to energy project and will eliminate the release of 64,000 tons per year of equivalent CO2, and bring substantial improvement to the quality of the Saginaw Bay watershed. 120 days

Newberry Renewable Energy

NOVI Energy is developing a wood fired 24 MW power generating facility located near the village of Newberry in Pentland Township, Luce County, Upper Peninsula of Michigan. The plant will utilize wood fuel created both from woodchips made from the unused portions of the trees cut for lumber and also from the byproduct sawdust generated by the local saw mills. By utilizing this waste wood, the facility will be classified as a renewable power generating station. The plant is to be built in an area that is generation constrained and has been cited as an important generation asset that will improve electric system reliability and quality of supply. Immediately

T O

O R

P P A

N s

Funding Request

Route (Infrastructure Only)

D VE

14 months from start of construction

$

20,000,000

24 months from start of construction

$

94,000,000

$

650,000

Energy strategy for the Pinnacle Aeropark Romulus , Wayne County, Project in the vicinity of Detroit Metropolitan Michigan Airport in Wayne County, MI

In this Project, NOVI Energy LLC will develop an energy strategy for the Pinnacle Aeropark which is part of the Detroit Region Aerotropolis initiative. An overall multifaceted energy strategy is an essential component in realizing a global city. The energy plan based on sustainability with added emphasis on alternative energy and energy efficiency will provide a long term opportunity for the development. An inventory of available fuel sources that can be used for alternative energy generation will be developed with a focus on fuel and technology diversity while maintaining a sustainable energy cost position. A detailed evaluation will be conducted to understand the energy needs of buildings and facilities slated for the Pinnacle Aeropark. This evaluation will also include incorporation of energy efficiency and demand side programs. An overall plan will be established that would utilize waste biomass based power and steam generation plants, biogas reactors that utilize local feedstock and other renewable energy generation assets including solar and wind generation. The plan will detail how to integrate with local utilities like DTE Energy that

Shelby Township

Construct a community Library to replace the undersized facility located in a former elementary school. The library will be constructed on Township property. All utilities are available to serve the site. 9/1/2009

12/1/2010

$

19,915,000

CHASS

Construction of Silver LEED certified Federally Qualified Health Center (FQHC) in SW Detroit by Community Health and Social Services, Inc. (CHASS). CHASS provides medical, dental, and health educationservices, in English and Spanish to census tracts that are among the poorest in the city.Sixty eight percent of its clients are uninsured. The 48,000 sq.ft. facility will replace a retrofitted 15,000 sq. ft. auto dealership that currently serves as the clinic.It will double the number of patients served annually, reduce ER use, reduce wait times, provide administrative offices for the non-profit, Groundbreaking and increase employment opportunities in SW Detroit. in May'09

June '10

$

17,700,000

Township Hall Repairs

Repair the Township Hall, in which currently the Michigan State Polioce has an outpost, including conducting an energy efficeincy audit and making energy efficient upgrades. Pave township hall parking lot.

Within 2 years of start date.

t s e

NOVI Energy LLC

Shelby Township

Southwest Detroit Community Health and Social Services Detroit

Sylvan Township

R d

e t tt

i m

b u S

Sylvan Township, Washtenaw County

02262009

Shelby Library

u q e

Submitted Requests - Not Approved

April, 2009

889 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township

Thomas Township, Saginaw County

Thomas Township, Saginaw County

Project Name

Project Description

Start Date

Expected Completion Date

Thomas Township Trail

Thomas Township is proposing to construct a 4.8 mile eight (8’) foot trail along the Consumers Energy easement. Community and family are at the heart of the American trail experience. One of the most significant benefits of trails is the sense of community and the connections they build. Trails also build strong, economically vital communities. According to the National Association of Home Builders study cited in The New York Times, trails are the number one amenity potential homeowners cite when they are looking at moving into a new community. Trails provide communities with a valuable amenity that translates into increased housing values. Trails can also revitalize neighborhoods, as well as build local businesses. 5/9/2009

Thomas Township Gratiot Road Business District Corridor

Corridor investments bring a number of tangible benefits to the citizens of a community. At the most basic level, we are encouraging the public to shop in our business district, so it must be attractive, safe and attainable. A clean and safe corridor is an indicator of civic pride and will help transform the rundown downtown area along Gratiot Road (M-46) into an attractive public amenity for all to enjoy. Secondly, these improvements lead to increases in the overall tax base by stimulating sales for existing businesses, helping to attract new investment to the improved area and ultimately by increasing property values. These benefits do not occur without the willingness of the private sector to respond to the public sector’s investment. For this reason, Thomas Township and the business community have teamed up to form a Downtown Development Authority (DDA). The Township and DDA’s plan is to help revitalize the business district and to stimulate growth and create jobs. 5/9/2009

T O

O R 12/9/2009

Funding Request

Route (Infrastructure Only)

D VE $

2,006,050

8/10/2009

$

1,706,469

12/9/2009

$

48,000

6/9/2009

$

24,150

P P A

N s

t s e

Due to a limited number of police officers, and the need for speed enforcement within Thomas Township, it is proposed that 6 portable solar powered electronic speed signs be purchased and placed in strategic areas of our community. Maintaining a safe traffic speed is increasingly more difficult in Thomas Township due to Hemlock Semi Conductor (HSC) expansion which has created over 1000 full and part time jobs. Our goal is to keep both contractors and residents in the township safe by keeping traffic at posted speeds. This type of electronic speed sign will have many benefits: Solar powered speed signs will allow rapid electronic adjustment in problem areas with excessive speed. Safety for the public is paramount while shopping in our business district. Just a few of the major uses of electronic speed signs are: Traffic monitoring and management; providing traveler information; Incident management; Enhancing safety of both the road user and pedestrians; increasing capacity; enforcement; tracking and evaluation of travel habits 7/9/2009

u q e

Thomas Township

Thomas Township

Thomas Township, Saginaw County

02262009

Solar Traffic Control Signs

i m

Thomas Township is proposing to install an electronic community sign on the corner of Gratiot and North Miller Roads. This is a highly visible corner not only for local residents but commuters traveling the Gratiot Road corridor. This electronic sign would be used primarily as a community sign announcing upcoming community events, but could also be used by the local businesses to advertise. In addition, this sign could display emergency disaster information through effective real-time messaging alerting the public to safety situations, broadcasting information on wanted Thomas Township Electronic Community Sign fugitives and Amber Alerts. 5/9/2009

b u S

Thomas Township, Saginaw County

e t tt

R d

Submitted Requests - Not Approved

890 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township

Thomas Township, Saginaw County

Thomas Township, Saginaw County

Project Name

Project Description

Start Date

Expected Completion Date

Thomas Township Sidewalk Enhancement

Thomas Township is a very active community, and it is looking to expand the sidewalks. Sidewalks are a vital component of an active community. Sidewalks also enhance safety. Pedestrian safety must be paramount, especially for children walking to school. Increasing sidewalk networks in areas where people live, learn, work and play will keep more children and families safe. Neighborhoods with sidewalks may actually have higher housing values. An Urban Land Institute study showed homebuyers were willing to pay a $20,000 premium for homes in pedestrian-friendly communities. Sidewalks can also help reduce vehicle emissions that pollute our air. 6/9/2009

Thomas Township North Business District

This Project consists of constructing the remainder of Shields Drive and related appurtenances. This roadway extension will create both an alternative route to the congested State highway (M-46) and a new community business dirstrict. This proposed project will create a new district that will consist of mixed uses such as residential, office business and service business. This new district will promote Thomas Township’s long-term economic liveliness and encourage high quality development. In addition, it will encourage a walkabout and pedestrian friendly business district to keep residents safe and enhance their quality of life.

5/9/2009

Thomas Township Department of Public Works Facility

O R

D VE $

763,315

8/10/2009

$

863,337

Thomas Township Public Works currently utilizes numerous storage areas scattered over an approximately 36 square mile area for both equipment and materials. The main storage area is located 5 " miles from the main population center where most of the department’s duties are completed. Additionally, this storage area is in an unsafe and unsound condition and needs to be replaced. This proposed project would replace all storage areas scattered around the community to one centralized facility located within the population center. By centralizing operations and storage, this will reduce the amount of fuel considerably that is used to retrieve or return supplies to various areas, numerous times over the course of a workday. The project has been designed by a LEED certified Architect and incorporates modern energy efficient measures for both lighting and heating. The design is complete and ready to bid out for construction immediately, providing funding is in place for that construction. 5/9/2009

1/10/2009

$

1,305,000

The Thomas Township water utility services 4639 customers in an operational area of approximately 36 square miles. Currently, all water meters are read for billing purposes manually. By utilizing modern technology, a considerable amount energy savings can be achieved by less vehicle usage in obtaining those readings. The proposed system would utilize remote battery based radio transmissions for the collection of water usage records throughout the Township. The solicited funds would purchase the necessary equipment to retrofit the Township’s existing system. By retrofitting the Township’s existing system instead of replacing it, the requested funds are being utilized prudently and wisely by avoiding undue waste of material and time. 5/9/2009

8/10/2009

$

670,500

T O

P P A

12/9/2009

Funding Request

Route (Infrastructure Only)

N s

t s e

Thomas Township

Thomas Township

Thomas Township, Saginaw County

R d

e t tt

i m

ub

Thomas Township, Saginaw County

u q e

Thomas Township Department of Public Works Facility

S 02262009

Submitted Requests - Not Approved

891 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Project Name

Project Description

Start Date

Thomas Township, Saginaw County

Thomas Township operates and maintains 14 sewage pumping stations throughout the community’s service area. These facilities are manually checked routinely, and utilize a rudimentary alarm telemetry system for alarms only and do not monitor operations. By incorporating a standardized, modern and efficient alarm telemetry system, the monitoring of these facilities could be accomplished remotely by utilizing data links through cellular systems connecting to a computer interface at various locations. This would be an immense savings in the amount of man hours currently dedicated for monitoring and would significantly reduce vehicle usage thus reducing fuel costs. The proposed system will integrate solar technology for the powering of the individual units. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide an uninterrupted power supply source to the telemetry system would be incorporated, not only for energy efficiency, but to also showcase the viability of Thomas Township Alarm Telemetry Upgrade renewable energy sources for practical purposes in a utility’s operations and monitorin5/9/2009

Thomas Township, Saginaw County

Thomas Township Sewage Pumping Station #2 Replacement

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

8/10/2009

$

48,000

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/9/2009

12/9/2009

$

243,000

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/9/2009

12/9/2009

$

243,000

T O

Thomas Township

Expected Completion Date

N s

t s e

u q e

R d

Thomas Township

Thomas Township, Saginaw County

02262009

i m

e t tt

Thomas Township Sewage Pumping Station #3 Replacement

b u S

Submitted Requests - Not Approved

892 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township, Saginaw County

Project Name

Project Description

Start Date

Thomas Township Sewage Pumping Station #6 Replacement

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/9/2009

Thomas Township Sewage Pumping Station #7 Replacement

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/9/2009

A T

Thomas Township

Thomas Township, Saginaw County

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

12/9/2009

$

243,000

12/9/2009

$

258,000

12/9/2009

$

243,000

O N

u q e

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/9/2009

R d

Thomas Township

Thomas Township, Saginaw County

i m

Thomas Township Sewage Pumping Station #8 Replacement

b u S 02262009

e t tt

Submitted Requests - Not Approved

893 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township, Saginaw County

Project Name

Project Description

Start Date

Green Fire Station

We have a need in the western part of our Township for a fire station. The residents and commercial properties in our entire western part of the Township must pay a higher insurance premium due to the fact their fire station is located more than five miles from their homes / business. If a fire station was built closure to their homes, the entire western part of our community would benefit from LOWER insurance rates. We already have some property where this could be constructed on but would need the federal dollars provided by this stimulus package to make this a reality and thereby allow some residents to enjoy a saving the rest of our community enjoys. This would clearly demonstrate the positive impact and commitment your desire by the stimulus package. This fire station would house a fire engine and rescue squad. It would provide a modern training facility for many fire fighters. This building would be constructed of the most modern technology known to create an ENERGY EFFICIENT GREEN BUILDING. The use of solar panels for its energy would be a must. Today’s fire stations must not only just be a fire station, but we must think green not red. We ne7/9/2009

Thomas Township, Saginaw County

75' Ladder Fire Truck (Quint)

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

8/10/2009

$

1,300,000

Our current aerial apparatus is a 1977 Mack Tele-Squirt with an open back cab. This truck is old and has several maintenance issues which at times make this truck inoperable. The National Fire Protection Association (NFPA) has addressed old fire trucks like ours in a standard section entitled NFPA 1901 annex D. In this standard, it requires retrofitting any apparatus having an open style cab. The cost to complete this project is cost prohibitive and therefore prevents us from meeting this standard. We have spent several thousand dollars maintaining this truck in an attempt to keep it road worthy and because we have a serious need for it. We don’t have the funding to replace this truck. The occupancies in our community which require the use of this type of truck are several two story homes, a three story senior citizens complex, several two story apartment type complexes, several large commercial buildings and chemical plant with several structures some of which are four stories in height. There are no other aerial apparatus located in the western part of our county, thereby making this unit a needed commodity. The only way we could continue to protect our c5/9/2009

7/10/2009

$

700,000

Two or More Full Time Police Officers

The Thomas Township Police Department services an area of 34.5 square miles, populated by more than 13,000 residents, has a major state highway that carries 50,000 plus daily traffic counts and is home to Hemlock Semi Conductor Corporation. Governor Jennifer Granholm calls HSC the gemstone and foundation for, “the new silicon valley.” She is courting other new business investments to this anchor zone to feed off HSC’s solar power division. HSC and the Dow Corning Corporation have committed to or already invested over 3 billion dollars in the HSC site. With this comes an additional 700 jobs and 1,100 construction jobs. The already overburdened police department is requesting funding under the Cops More Grant to add two full-time police officers to provide two-officer coverage on most shifts. The Council on State Governments, a policy study group of the Bureau of Justice Statistics of the U.S. Department of Justice, recently released findings that indicate Michigan is the most violent of the 14 Great Lakes States. They also noted that we have fewer police officers per capita than any of the other 13 States. The two most violent countie4/9/2009

Continuing

$

299,245

Roberts Park Expansion

Thomas Township had the opportunity to purchase 29 acres from a local service club two years ago that allows us to expand one of our parks. The plans for this expansion has been split into three phases and we are requesting money to begin the first phase. Phase one includes three soccer fields, three sand volleyball courts, parking, eight foot walking trails, bathroom/storage facilities, and the picnic tables and landscaping necessary to make this a wonderful park for our residents. 5/9/2009

12/9/2009

$

4,525,000

T O

Thomas Township

Expected Completion Date

N s

t s e

u q e

R d

Thomas Township

i m

ub

Thomas Township, Saginaw County

e t tt

S Thomas Township

Thomas Township, Saginaw County

02262009

Submitted Requests - Not Approved

894 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Thomas Township

Thomas Township, Saginaw County

Project Name

Project Description

Start Date

Communication/IT Server Improvement

Thomas Township has three main buildings with in a "campus type area". These buildings all have their own outdated servers which provide software, communication (email), archives of documents, communications to County and elsewhere. Our plan is to link the buildings through the use of updated large capacity servers which would enhance the ability to archive sensitive documents while enhancing and strengthen th ability to communicate from one server, and have our own back up file system. 5/9/2009

$

258,000

5/1/2009

$

4,500,000

5/1/2009

$

1,470,000

Thomas Township, Saginaw County

Thomas Township Sewage Pumping Station #5 Replacement

Tuscarora Township

Tuscarora Township

Indian River Sewer Project

Indian River Sewer Project

Tuscarora Township

Tuscarora Township

Indian River Pathway/Sidewalk System

Indian River Pathway/Sidewalk System

Tuscarora Township

Tuscarora Township

Bridge over Indian River

Bridge over Indian River

Village of Port Austin

T O

D VE

52,230

Thomas Township

12/9/2009

Funding Request

$

Current pumping facility was installed in 1970 and has been in continuous operations since that time. This facility is in poor condition, highly energy inefficient, and necessitates personnel entering dangerously confined and restrictive spaces. This facility currently is in need of replacement. The proposed replacement incorporates modern, energy efficient equipment for the conveyance of sewage generated in its district. The facility would utilize numerous “green technologies” with this proposed replacement. Use of an onsite standby natural gas generation unit (versus a vehicle trailer mounted diesel generation unit) would provide emergency backup power in a cost effective, more energy efficient, and less polluting means. This community is home to the largest solar material manufacturing facility in the nation. The unique application of photovoltaic cells to provide uninterrupted power supply to controls and telemetry systems would be incorporated, not only for energy efficiency, but to also showcase the viability of renewable energy sources for practical purposes in a utility’s operations. 6/9/2009

s t s

Expected Completion Date

O R

P P A

-N

e u

12/9/2009

5/1/2009

The Village of Port Austin is economically disadvantaged and heavily dependent on tourism and recreational activity. Its biggest asset has always been the Lake Huron shoreline, harbor and waterfront. The redevelopment effort now underway will improve the entire waterfront, adjacent to downtown Port Austin. This project will connect the downtown to the waterfront, offering access and connectivity between the business district and the Lake Huron shoreline, state marina and boat access site and piers. It will greatly enhance public opportunities to access and enjoy the waterfront and increase traffic to local businesses. This project is the cornerstone of the community’s economic development plan. The Village is requesting funding for the new Visitors/Community Center of the Project. The current facilities that house these functions are not accessible to the handicapped and do not meet our needs for serving the public. The existing civic center will be moved off-site and preserved elsewhere by the Port Austin Area Historical Society, opening views from downtown. The new community building is being design by a LEED certified architect. It is purposSummer 09

Fall 09

$

600,000

Campbellgate Farms Sanitary Sewer Extension

Construction of approximately 5,000 linear feet of 8" sanitary sewer, and replacement of the disturbed pavement. 4/1/2009

5/1/2010

$

1,975,887

4/1/2010

$

1,250,000

d e tt

t i m

Visitors Center

ub

q e R

Waterford Township

Waterford Charter Township, Oakland County

Waterford Township

Waterford Charter Township, Oakland County

Sanitary Sewer Retention Basin at Calvert Pump Station

Construction of a underground retention vault to hold storm surge from infiltration durring a storm event.

Waterford Township

Waterford Charter Township, Oakland County

Sanitiary Sewer Lining

Installation of reinforcing lining for approximately 320,000 feet of existing vitrified clay sanitary sewer 5/1/2009

11/1/2010

$

10,642,500

Waterford Township

Waterford Charter Township, Oakland County

Ejector Station Rehabilitation

Rehabilitation of the existing wet wells of four converted ejector stations. Replacement of pump station equipment.

8/1/2010

$

1,400,000

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

4/1/2009

7/1/2009

895 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Waterford Township

Waterford Charter Township, Oakland County

Rehabilitation of Lift Stations

Rehabilitation of 11 sanitary sewer lift stations including new tanks, pumps, valves and piping, controls, and security. 7/1/2009

9/1/2010

Waterford Township

Waterford Charter Township, Oakland County

Sanitary Manhole Rehabilitation

Inspection of 2,400 sanitary sewer Manholes and rehabilitation of an expected 30% of failing manholes. 4/1/2009

12/1/2009

Waterford Township

Waterford Charter Township, Oakland County

Private Property Inflow Elimination / Stormwater Conveyance

Instalation of a stormwater conveyance pipeline, disconnection of existing private footing and sump drains from sanitary sewer, and connection of private footing and sump drains to new conveyance system.

8/1/2010

Waterford Township

Waterford Charter Township, Oakland County

Water Treatment Plant 32-1

Construction of new source well and a pipe line from well to the water treatment plant. Removal and replacement of existing filter equipment. 5/1/2009

Waterford Township

Waterford Charter Township, Oakland County

Water Main Relining

Installation of reinforcing lining for approximately 144,000 feet of existing asbestoscement water main

Waterford Township

Waterford Charter Township, Oakland County

Huron Gardens Gate Valve Replacement

Replacement of 150 existing gate valves in the Huron Gardens area watermain system.

Waterford Township

Waterford Charter Township, Oakland County

Section 9 and Nelsey Road Water System Booster Stations

Waterford Township

Waterford Charter Township, Oakland County

Funding Request

$

Route (Infrastructure Only)

3,006,250

D VE $

3,120,000

$

34,247,500

9/1/2010

$

3,260,000

5/1/2009

9/9/2009

$

32,480,000

5/1/2009

6/1/2010

$

1,005,000

Construction of 2 water system booster stations and 4 pressure sustaining valves.

4/1/2009

6/1/2010

$

393,750

Maceday Water Tank Roof Rehab

Removal of an existing concrete roof and installation of a color matched aluminum geodesic dome.

4/1/2009

10/1/2010

$

1,287,500

Waterford Township

Waterford Charter Township, Oakland County

Main Street Water Tower Lead Abatement

The removal and containment of existing lead based paint from the water tower as well as a new coat of paint.

5/1/2009

10/1/2009

$

625,000

Waterford Township

Waterford Charter Township, Oakland County

Cass Lake Water Tower Lead Abatement

The removal and containment of existing lead based paint from the water tower as well as a new coat of paint.

5/1/2009

10/1/2009

$

750,000

Waterford Township

Waterford Charter Township, Oakland County

Windmill Pond Flood Mitigation

Construction of a 27" concrete pipe storm water outlet to Eagle Lake.

5/1/2009

9/1/2009

$

380,000

Waterford Township

Waterford Charter Township, Oakland County

Waterford Drainage Retention Basin Restoration

Repair 150 existing drainage retention basins throughout the Township to restore drainage functionality.

4/1/2009

12/30/2009

$

950,000

Waterford Township

Waterford Charter Township, Oakland County

Build a new Fire Station No. 4 building to replace the existing 60 year old functionally obsolete building. This fire station serves the northeast quadrant of the Township and also serves as a fire vehicle maintenance facility. 9/1/2009

12/30/2010

$

4,000,000

Hildebrandt & Harrison Improvements

Reconstruct portions of Hildebrandt and Harrison Roads including upgrading the wate main along Harrison. Existing roads are failing and serves hundreds of truck trips daily. Needed to retain existing businesses and to attract business that support the airport. Reinforce the importance of the airport and its related development as part of the regional economic health of Metro Detroit.

$

Hildebrandt from Middlebelt to Harrison and Harrison from 8,000,000 Goddard to Wick

Goddard Road Reconstruction

Reconstruct Goddard Road through downtown Romulus. Existing road is failing and serves thousands of trips daily. Road is deteriorating at an unprecedented rateRomulus has exhausted all repair options. This work is needed to retain the vitality and success of downtown Romulus.

$

Goddard from 5,500,000 Grant to Wayne

City of Romulus

City of Romulus

City of Romulus

02262009

it

Waterford Fire Station No. 4 Project

m b u

S

City of Romulus

d e tt

T O

q e R

N s

Submitted Requests - Not Approved

O R

P P A

st

e u

5/1/2009

896 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Romulus

City of Romulus

City of Romulus

City of Romulus

Project Name

Project Description

Start Date

Wahrman/Wayne/Eureka Intersection

Reconstruct Wahrman and Wayne Roads and realign the existing intersection at Eureka Road. The existing intersection located too close to the I-275 ramps and creates large queues and high delays negatively impacting residents, businesses and airport users. The current alignment also creates a safety concern. Improvements at this location will stimulate job creation in the Southern Gateway and improve regional access to Pinnacle and Aerotropolis.

Inkster & I-94 Interchange

Construction of a full interchange, preferably a Single Point Urban Interchange (SPUI) similar to Telegraph & I-94. Inkster Road has been identified as a regional ring road as part of Aerotropolis and would improve regional access to airport and support businesses. This improvement would also stimulate investment in underutilized properties and buildings along this primarily industrial corridor.

City of Romulus

Pennsylvania Rail Grade Separation

Construction of a railroad grade separation on Pennsylvania Road. Due to the number of tracks and volume, traffic can be halted for up to 20 minutes at a time, multiple times a day. This location significantly impacts emergency vehicle movements for multiple communities.

City of Romulus

Water Monitoring & Technology Improvements

Installation of water monitoring devices and updated GIS system. Romulus needs to have a method of safeguarding its public utilities-this need is magnified by the presence of the airport. Summer 2009

City of Romulus

City of Romulus

T O

City of Romulus

Shook Road Rehabilitation

City of Romulus

City of Romulus

Tobine Road Rehabilitation

Brandt & Cypress Reconstruction

Construction of a new concrete, industrial service road . Current condition (especially at intersection of Ecorse Road) is extremely poor. Many property owners have expressed concern that road condition may force tenants out.

City of Romulus

City of Romulus DNR

City of Romulus

City of Romulus

City of Romulus Upper Peninsula, Kent County

q e R

d e t

Huron River Drive Rehabilitation Mine Reclamation and Repair

itt

Village of Spring Lake Spring Lake Village

Grand River Greenway Bike Path_ Phase I and II

Village of Spring Lake Spring Lake Village

Exchange Street Streetscape

m b u

S

Village of Spring Lake Spring Lake Village

Wayne County

Cutler Street Reconstruction

Allen Park, Dearborn Heights, Ecorse, Inkster, Lincoln Park, Melvindale, Taylor, Romulus, North Branch Ecorse Creek Flood Control Westland Project

02262009

Summer 2009

Spring 2010

180 days from funding

1 year from funding

Road rehabilitation project to address deteriorated asphalt and concrete sections from Hannan to Goddard. Design completed several years ago but failed to materialize due to funding.

Total Mine Reclamation / Repair Costs

7,200 linear feet of alternative transportation path 7/9/2009 600 feet of streetscape, new parking, safety improvements at intersections and ADA ramps, underground utilities 4/10/2009 600 feet of reconstructed Major Street, safety improvements at intersections and ADA ramps, underground utilities 4/10/2009 Construction of improvements to North Branch Ecorse Creek to prevent recurring widespread flooding of properties. Improvements include storm water detention basins; widening of the 17-miles of open waterway; utility relocations; enlarging 83 bridges and crossings of the waterway; wetland creation within greenway.

Submitted Requests - Not Approved

$

7,000,000

$

35,000,000

$

Pennsylvania, 15,000,000 West of Wahrman

$

$

$

Brandt from Ecorse to Dead End, 1,000,000 Cypress

$

1,750,000

$

1,000,000 Hannan to Goddard

$

11/9/2009

$

9/9/2009

$

9/9/2009

$

Design Underway; construction immediately following 9/30/2011 (parts)

1,000,000 Shook from 1,000,000 Goddard to Wick Tobine from Shook 1,000,000 to Wick

$

e u

Court currently operates out of facilities that are not properly equipped to handle security and technology needs of modern facilities. The facility does not have the needed capacity to accommodate current administrative needs.

District Court Expansion

Summer 2011

-N

City of Romulus

City of Romulus

O R

Funding Request

Route (Infrastructure Only)

D VE

P P A

Road rehabilitation project to address deteriorated pavement on Shook Road just north of Downtown Romulus. This is a City Major street that provides access to the local cemetery. Road rehabilitation project to address deteriorated asphalt section from Shook to Wick.

s t s

Expected Completion Date

$

208,000 Tri-Cities Connector Path to Leonard Road Bike 1,700,000 Path Buchanan to 300,000 Division Exchange Street to 200,000 Liberty Street

240,000,000

897 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

15 communities (Canton Twp., Dearborn Heights, Garden City, Inkster, Livonia, Northville, Northville Twp., Plymouth, Plymouth Twp., Redford Twp., Van Buren Twp., Wayne, Westland, Novi (Oakland Co.))

Southeast Michigan Regional Energy Office City of Lincoln Park

Lake County EDC

Sweetwater, Lake, Pleasant Plains, Yates and Chase Townships in Lake County

Project Name

Project Description

EnVironmental Transportation Solutions, LLC Deckerville Community Hospital Deckerville Community Hospital Deckerville Community Hospital Deckerville Community Hospital

City of Bay City, MI

Start Date

North Huron Valley/Rouge Valley sewer system: Construction of Short Term Corrective Action Plan to eliminate Sanitary Sewer Overflows (SSOs)

DDA Phase I Lighting Project

Replace and/or retrofit street lights with energy efficient lighting. Light emitting diodes As soon as RFP (LEDs) are likely to be used in the replacement and retrofiting of street lights to out & contract reduce energy consumption and increase light life. signed

Three Weeks after start

Pere Marquette Watershed Stream Crossing Protection

Road/stream Crossings on the Pere Marquette River are sending sediments into this State Natural River and Federal Wild and Scenic River. The impact of this sedimentation adversely affects our tourism industry and environment. Many crossings are 50+ years old 2009

City Hall Roof Restoration

The work includes removal of existing and installation of new clay tile roofing over the entire building, except at the tower. Replacement of the west wing skylight, repairs at tower roof, masonry repairs, and repairs to storm water piping and downspouts. Roof is over 110 years old and is in poor condition. Life expentancy of terra cotta roof is usually 50-75 yrs. City Hall was constructed in 1896 and is listed in the National ASAP - The City register of Historic Places. Significant landmark in Bay City, with daily tours of City is ready to begin Hall of school aged children and museum traffic. Roof leaks have caused leaks that the project, if have damaged the plaster walls throughout the building. The existing condition of the funds are roof is critical and requires replacement as soon as possible. alocated.

Design Underway; construction immediately following 9/30/2011

O R

A T

t s e

PP

O N

qu

e R

Funding Request

$

17,800,000

2009

$

500,000

10-12 months to complete

$

1,423,000

Production starts with 50 unit build at 9 months after funding is in place $

17,000,000

Assembly - Detroit Renaissance Zone Detroit Chassis, LLC Engineering - Grosse Pointe Woods/Wayne County

EcoVElectric

EnVironmental Transportation Solutions (LLC) provides a solution that saves money and pays you to be green. We develop and market an urban based electric Low Speed Vehicle for city fleets using an established world-class assembly partner in Detroit. We will create up to 300 jobs assembling EcoV and 900 additional jobs supporting the plant. EcoV is a road-worthy commercial fleet vehicle priced under $10,000 with a significant tax credit ($3751) for private buyers. Private use sales will be to retirement, resort communities and urban families. EcoV has no emissions, no noise, no CO2 is release in operation, and is virtually maintenance free. For 50 cents, you’re charged and ready to go 25-40 miles. EcoV is 25 mph plug-and-play easy, reliable and you feel safe driving on all public roads 35 mph or slower. EcoV has multiple models built off a flexible platform using proven components. All the models can carry over 1000 pounds of payload. We have $6M in equity, require $3M in capita to start production and $8M in debt to expand. We breakeven on a mere 2,500 units Immediately with annually, have a realistic marketing approach that targets commercial customers that funding

Deckerville

Utility Updgrades

Energy Conservation upgrades

5/1/2009

10/1/2009

$

66,500

Operating Room A/C

Operating Room - Renovation/HVAC

6/1/2009

9/1/2009

$

350,000

Deckerville

Renovate Hospital HVAC

Mechanical Upgrades - upgrade

5/1/2009

10/1/2009

$

470,000

Deckerville

Assisted Living

Assisted Living - 36 units - New construction

5/1/2009

6/1/2010

$

2,750,000

Deckerville

02262009

d e tt

t i m

S

ub

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

North Huron Valley/Rouge Valley sewer system, Final Order of Abatement implementation: Construction of Short Term Corrective Action Plan to eliminate SSOs. Includes repair of 10,000 feet of sewer interceptors with known structural defects; chemically grout joints for 27,000 feet of interceptors with known infiltration defects; perform various forms of rehabilitation on 817 manholes; open/repair 29 manholes that could not be opened during previous phase of project; repairing ten regulators, reparing five comfort stations, and complete cleaning and inspection of 5,400 feet of siphons, ranging in size from 30-inch to 102 inch.

s

City of Bay City

Expected Completion Date

898 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County

Newaygo County

Newaygo County

Newaygo County, White Cloud, MI

White Cloud

White Cloud, MI

Project Name

GIS web-based mapping

New Shelter

In an attempt to make Newaygo County more attractive as a place to live, work and raise a family, we would like to construct a new Animal Shelter. The current shelter does not meet the needs of the county because of its age and size. By constructing a new shelter we could expand our operation and hold more animals and provide better service to the people of the County. This would ensure work during the time of construction and create the potential for added employees in the future for the shelter operation. March 1st, 2009

Court & Community Connectivity Initiative (CCCI)

Scan all Probate Court records and documents to be used online by clients and staff. Clients can obtain data online for records from the 1970's until present, as well as file any approved documents electronically. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. Objectives: ease of access, increased efficiency, improved image quality. 2/15/2009

White Cloud, MI Scipio Township Scipio Township

Connectivity Initiative Graveling Roads Tire Clean-Up

Scipio Township

Scipio Township

Tree Planting

Scipio Township

Scipio Township

Township Hall

Scipio Township

Scipio Township

Road Stabilization

Scipio Township

Scipio Township

Handicap

Scipio Township

Scipio Township

u S

Scipio Township

itt

T O

s t s

immediate

-N

Scan all Probate Court records and documents to be used online by clients and staff. Clients can obtain data online for records from the 1970's until present, as well as file any approved documents electronically. An online user friendly database will be developed to provide such services regardless of the user's location. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. 2/15/2009 Berm 27 miles of gravel roads and re-gravel @ $40,000.00 a mile. 4/15/2009 Road side tire clean up and disposal of old tires 4/15/2009 Each parcel of land receive QTY 2 maple trees the size of 4-5 feet to beautify the township. 4/15/2009 To construct a township hall to have all information in one designated location, and to have a handicap location for township meetings. 4/15/2009 Oil field brine all gravel roads to have road stabilization of gravel roads and also helps dust control. 4/15/2009 Handicap ramp put on historic Grange Hall where meetings are held and many events in the community. 4/15/2009

d e t

q e R

9/1/2009

O R

Funding Request

$

Route (Infrastructure Only)

25,000

D VE

November 31st, 2009

$

300,000

8/15/2009

$

27,000

6/15/2009 6/15/2009 7/15/2009

$ $ $

27,000 1,080,000 10,000

7/15/2009

$

150,000

7/15/2009

$

160,000

8/15/2009

$

20,000

7/15/2009

$

45,000

P P A

e u

Gasoline Relief

Give every property owner a $2000.00 gasoline gift card. This will give relief to families and help stimulate the economy. If not a property owner, but a registered driver then you receive a $1000.00 gasoline gift card.

3/15/2009

8/15/2009

$

6,000,000

Pope Road Bridge

Pope Road bridge – rehab abutments and replace superstructure for Pope Road bridge to allow vehicles, buses, etc to travel this road. (bridge is about to be closed down and will cause inconveinces to our citizens.

4/15/2009

9/15/2009

$

75,000

3/15/2009

Immediately

$

900,000

summer 2009 summer 2009

summer 2009 summer 2009

$ $

300,000 500,000 M-37

bm

Scipio Township

Scipio Township

Property Tax Relief

City of Grant City of Grant

Grant City Grant City

Grant City Blanche Lake Park Grant City Storm Water Improvement

02262009

Start Date

Restructure and redevelop the current web-based GIS map program to provide the public and other businesses a consistant, accurate and simple to use internet map service.

Newaygo County Scipio Township Scipio Township

Scipio Township

Project Description

Expected Completion Date

Property Tax Relief for 1 year. This will help everyone in township to help hang onto their homes and give relief. Hillsdale County has loss a lot of jobs and many people have already lost their homes. This can help “everyone” hang on to their homes. Provide baseball diamond, shelter, new fishing dock, recreational equipment and paving Provide more adequate storm sewers to handle runoff

Submitted Requests - Not Approved

899 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

summer 2009 summer 2009

$ $

2,862,000 50,000

9/1/2009

$

25,000

10/31/2009

$

50,000

5/1/2009

10/1/2009

$

50,000

12/1/2009

2/28/2010

$

55,000

7/1/2009

8/1/2009

$

59,500

6/1/2009

9/1/2009

$

60,000

4/1/2009

7/1/2009

$

75,000

1/1/2010

5/1/2010

$

175,000

Thin-Client/Virtual Desktop system solution project to enable end user computing resources through a VDI model in compairson to the traditional workstation model. Eliminating excessive end user desktop hardware and increasing IT efficiencies.

immediate

9/1/2011

$

30,000

Bring all end users MicroSoft Office software up to the same version. (150 licenses)

immediate

Grant City

City of Grant City of Grant

Grant City Grant City

Streetscape Wastewater treatment plant and collection system upgrade Solar Roof for City Office

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Telemedicine Specialty Clinic

Remote spcialty Clinic

5/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Community Education

Community Medical Support

8/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Renovate Harbor Beach Clinic

Energy Savings

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Renovate Basement

Building Repairs

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Extended Care Rehab unit boiler

Energy Savings

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Electronic temperature controls

Energy Savings

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Administrative Building

Office Renovations

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

OR/Central Sterile Remodel

Infection Control

Newaygo County Newaygo County

Thin-Client/Virtual Desktop

d e tt

T O

q e R

O R

P P A

N s

st

e u

summer 2009

$

D VE

7/1/2009

$

42,000

12/31/2009

$

75,000

SAN System

SAN network storage system expansion and upgrade. Implementation of virtual servers and eliminate multiple server hardware components (towers and monitors) and expand networking capabilities. Improved SAN technology would permit off-site backup of data and allow for the Implementation of thin-client technology. immediate

3/1/2010

$

100,000

Purchase of Patrol Bicycles

The purchase and use of bicycles for neighborhood Public Safety patrols would reduce the need for automobile patrol and increase neighborhood involvement.

$

5,000

Southeast Michigan Village of Grosse Pointe Regional Energy Office Shores

Heat System for Large Garage

To replace 4 hanging Majic Chef 200,000 BTU furnaces with more efficient "tube infrared heaters". The infrared heaters use 67% less natural gas than the existing furnaces, saving approximately $4896 the first year of service and additional savings 45 days after a 10 days after as costs rise. This project would also save electric costs. contract is signed project start

$

12,840

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

Increased community outreach and a coordinated effort to involve local school district Organization of Community Outreacha nd in innovation and education will raise awareness and identify energy saving Within 90 Days Classroom Innovation Educational Programs methodology and ideas for community and home.

$

25,000

Newaygo County

Newaygo County, White Cloud, MI

ub

Newaygo County, White Cloud, MI

S

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

02262009

t i m

AS400 Upgrade

Submitted Requests - Not Approved

Immediately (with 30 days for funds) purchase

Ongoing throughout year

Route (Infrastructure Only)

700,000 M-37

Purchase and implementitation of new i-Series AS400 Server to replace the current unit which is at it's end-of-life. Project and cost assumes new scanning program is in place. immediate

Newaygo County

End user software upgrade

Funding Request

Revitalize M-37 corridor through the center of the City, to improve traffic, pedestrian friendly sidewalks, new LED environmentally friendly street lights, in effort for economic benefit spring 2009 Upgrade treatment plant and collection system that was installed in 1954 that is in dire need of repair and upgrades spring 2009 Solar roof for City Office will reduce energy cost to the City by ~40% summer 2009

City of Grant

Newaygo County, White Cloud, MI Newaygo County, White Cloud, MI

Expected Completion Date

900 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

The promotion of carbon footprint reduction comes through increased education and additional building and property maintenance Code enforcement. Additional proposals include reduced building and mechanical fees for permits involving the installation of low energy/high efficiency appliances and fixtures (i.e., furnace, hot water heater, Immediately (with Ongoing generators, heat pumps, fluorescent bulbs, etc.). funds) throughout year

$

25,000

Southeast Michigan Regional Energy Office City of Huntington Woods Lighting Replacement - Retrofit

The City of Huntington Woods owns five buildings that are between fifty and sixty years old. These buildings still have old outdated lighting installed. The project would entail the replacement of 481 individual fixtures with new energy compliant fixtures. This would represent a significant savings in energy. The City would save well over As soon as $100,000 annually. The projected payback period would be only five years. approved

$

48,000

Southeast Michigan Regional Energy Office City of Farmington Hills

Fleet Vehicle Replacement

This involves the replacement of 15 gas operated fleet vehicles ($25,000 per vehicle) with more energy efficient and environmentally friendly hybrid vehicles. Expected benefits include savings on fuel; education of staff on benefits and operation of hybrids; environmental (air and global warming); incentive to initiate training of staff involved in fleet maintenance. Acquisition of these vehicles will demonstrate City support of protecting the environment and encourage the use of alternatives to fossil fuel.

$

375,000

Southeast Michigan Regional Energy Office Mt. Clemens

Mt. Clemens Water Filtration Plant Improvements

Upgrade and replace four filter beds. Filter bed medium material to be upgraded allow beds to operate more efficiently. Provide and install emergency generator.

7/10/2009

$

7,000,000

Dearborn Heights, Grosse Pointe Woods, Harper Woods, Inkster, Redford Combined Sewerage Overflow Retention Twp, River Rouge Treatment Basin Improvements

Improvements to Sodium Hypochlorite System at 5 Combined Sewerage Overflow Retention Treatment Basins in Wayne County to allow improved treatment of sewage overflows over a range of storm events while minimizing the amount of chlorine Design Underway; residual discharged from the facilities and the attendant periodic potential stress to theconstruction Rouge River fish population. Improvements include upgrades to piping, pumps, immediately dosing equipment and instrumentation. following 6/30/2010

$

650,000

All Wayne County communities

Implementation of various activities required under the municipal storm water permits issued to 43 Wayne County communities, including Illicit discharge elimination, storm water management, public education, and support to community-based Watershed Alliances. Underway

9/30/2011

$

2,000,000

Drain improvement projects in various Downriver communities, to improve stormwater management and eliminate E. Coli contamination from urban waterways. 2 projects ready to go: 1) Cook and Gladding Drain Petition Project (Flat Rock, Huron Township, Brownstown township), to improve (widen) the drain waterway including Drain improvement projects in various replacement of all but 2 crossings (Project cost = $2,800,000) and 2) Pink and Wager Downriver communities, to improve Intercounty Drain (extends between Wayne and Monroe County) Project includes stormwater management and eliminate E. Coli creating a detention area, replacing culverts, removing sediment and enclosing a contamination from urban waterways. section of the drain (Project cost = $ 85,000). Other projects pending funding source. Underway

9/30/2011

$

5,000,000

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

Wayne County

Wayne County

Wayne County

All Wayne County communities

02262009

Promote "Carbon Footprint" Reduction

Municipal storm water permit compliance

tt i m

d e t

T O

s t s

-N

P P A

O R

2/9/2009

3 months

e u

q e R

b u S

Submitted Requests - Not Approved

D VE

Route (Infrastructure Only)

901 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Project Name

Project Description

Continued implementation of the Rouge River National Wet Weather Demonstration Project: construction of combined sewer overflow controls, sanitary sewer overflow controls, storm water management facilities; habitat restoration projects; public involvement activities; support to Alliance of Rouge Communities

Allen Park, Dearborn Heights, Ecorse, Inkster, Lincoln Park, Melvindale, Taylor, Romulus, Southgate, Westland, Ecorse Creek Illicit Discharge Elimination Wyandotte Project

Investigation and removal of illicit discharges of sewage to Ecorse Creek in response to the Total Maximum Daily Load (TMDL) for e coli (bacteria in sewage) issued by the MDEQ for the protection of public health Underway

100,000,000

9/30/2011

$

100,000,000

5/1/2009

6/1/2009

$

25,000

7/1/2009

9/1/2009

$

82,500

6/1/2009

11/15/2009

$

14,300 Local

6/1/2009 6/1/2009

11/15/2009 11/15/2009

$ $

15,100 Local 90,000 Local

Structural Improvements/Preventive Maintainance

6/1/2009

11/15/2009

$

126,900 Local

Structural Improvements/Preventive Maintainance Structural Improvements

6/1/2009 6/1/2009

11/15/2009 11/15/2009

$ $

163,700 Local 174,504 Local

Structural Improvements

6/1/2009

11/15/2009

$

530,270 Local

Rehabilitation of the City's primary pump station that pumps nearly all of the wastewater flow to the treatment plant. Project includes replacement of 3 existing pumps and the additon of one new pump and replacement and upgrade of the electrical and instrumentation system.

90 days from authorization of funds

120 days from start of construction

$

545,000 NA

Replace approximately 1200 feet of old 12-inch water main and associated appurtenances from Sisu Knoll to Oak Ridge Drive

90 days from authorization of funds

30 days from start of construction

$

360,000 NA

90 days from Replace approximately 2700 feet of old 8-inch sewer force main from the RR tracks to authorization of Rickett Rd. Sanitary Force Main Replacement the City Limits. funds

30 days from start of construction

$

360,000 NA

30 days from start of construction

$

165,000 NA

30 days from start of construction

$

210,000

60 days from completion of bids $

175,000

Exterior Repair

Tuck point and seal

Fairfiled Township

Fairfield Township

Yankee Road from Morse to Lyons, Seal Coat Preventive Maintainance

Fairfiled Township Fairfiled Township

Fairfield Township Fairfield Township

Fairfiled Township

Fairfield Township

Fairfiled Township Fairfiled Township

Fairfield Township Fairfield Township

Fairfiled Township

Fairfield Township

Yankee Road from M52 to Morse, Seal Coat Geneva Street 755.0', rebuild Sandcreek Highway from Mulberry to Weston Wedge and Seal Horton Road from Sandcreek Hwy Morse, Wedge and Seal Lyons Highway Culvert Arnold Hyw from Weston to the Ohio Line, 2" base, 1 1/2" top

City of Brighton

City of Brighton

City of Brighton

City of Brighton

City of Brighton

02262009

i m

Rickett Rd. Water Main Replacement

ub

S

City of Brighton

e t tt

Third Street Sewage Pump Station

City of Brighton

City of Brighton

Preventive Maintainance Structural Improvements

s t s

T O

-N

e u

eq

R d

City of Brighton

D VE $

Handicap Entrance/Steps - Replacement/upgrade

City of Brighton

O R

P P A Underway

Funding Request

Route (Infrastructure Only)

9/30/2011

Replace Entrance Steps

City of Brighton

Start Date

48 communities in 3 counties (Allen Park, Auburn Hills, Beverly Hills, Bingham Farms, Birmingham, Bloomfield Hills, Bloomfield Twp., Canton Twp., Commerce Twp., Dearborn, Dearborn Heights, Farmington, Farmington Hills, Franklin, Continued implementation of the Rouge River Garden City, Inkster, Lath National Wet Weather Demonstration Project

Wayne County Deckerville Community Hospital Deckerville Deckerville Community Hospital Deckerville

City of Brighton

Expected Completion Date

Hillcrest Booster Station

Replace aging water booster station to maintain water service and provide Fire Protection to the Hillcrest residential area.

90 days from authorization of funds

Brighton-Howell Fiber Optic Line

Fiber optic data transmission line between City of Brighton & City of Howell. Will facilitate shared services between multiple governmental units, and improved efficiency.

60 days from authorization of funds

Downtown Surveillance Cameras

Surveillance video cameras for downtown district to enhance safety as an intregal part90 days from authorization of of walkable community project, with economic benefits to downtown business community. funds

Submitted Requests - Not Approved

902 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Grant Grant City

Project Name Pave-Resurface Roadways 6.03 miles

City of Grant

Grant City Industrial Park

Grant City

City of Hart

Hart City

Project Description resurface streets in need of repair Provide water, sewer and road access in order to create three industrial sites for job and tax base growth

Wood Street & Dryden Street Water/Sewer Improvements

This project would include replacement of a sanitary sewer, water main, Stormwater separation, and street replacement located at Wood Street and Dryden Street This project would include street, sewer, water and sidewalk replacement/improvements on Peach Street;which is the primary route for traffic to the Hart Public School campus.

Start Date summer 2009

Expected Completion Date Funding Request summer 2009 $ 250,000

summer 2009

summer 2009

4/9/2009

City of Hart

Hart City

Peach Street Improvements

City of Ludington

Ludington City

Mitchell St. Sewer Main Replacement

City of Ludington

Ludington City

Resurface Downtown Parking Lots

Replace approximately 600 LF of sanitary sewer main on Mitchell Street. The existing sanitary sewer is flat, which results in periodic sewage backups into residents' homes. 6/9/2009 This project would resurface and restripe the City-owned downtown parking lots located adjacent to the Eagles club and the Post Office. 5/9/2009

A T

City of Ludington

Ludington City

Rath Ave. Lift Station Upgrades

This project would install a new sewage transfer pump at the Rath Ave. lift station in order to provide a bypass or back in the event of a failure of the City's largest lift station. This lift station handles 50% of the City's sewage flow. Without this transfer pump, sewage would back up into hundreds of properties in the event of a failure of this lift station. 5/9/2009

City of Ludington

Ludington City

North Lewis Street Reconstruction

This project would entail reconstructing North Lewis Street, including new pavement, new curb & gutter, new water & sewer mains, and new sidewalk. 5/9/2009

s

t s e

O N

Relocate three force mains and install approximately 700 LF of sanitary sewer main on Bryant Road. The three force mains carry sewage from locations outside of the City. The condition of the force mains and sanitary sewers has resulted in numerous complaints of sewage odors. This project will eliminate these odors and relcoate a 40 year-old force main, which runs through the City's cemetery. 4/9/2009 This project would entail resurfacing various City-owned streets that have fallen in various states of disrepair. 5/9/2009 This project would entail repainting the Gaylord Avenue water tower 6/9/2009

u q e

City of Ludington

Ludington City

Tamarac Village/Bryant Road Force Main Project

City of Ludington City of Ludington

Ludington City Ludington City

Resurface City Streets Gaylord Water Tower Repainting

Ludington City

This project would entail constructing a new breakwater at the Loomis Street boat launch in order to prevent sedimentation from filling in the boat launch area. An ADAcompliant walkway would be placed on top of the breakwater to allow greater public access to the waterfront. This project will eliminate the need for annual dredging of Loomis Street Breakwater & Walkway Project the boat launch area. 5/9/2009

City of Ludington

R d

e t t

it

D VE $

$

Peach Street, between W. Main Street and Johnson 550,000 Street

8/9/2009

$

120,000

6/9/2009

$

125,000

8/9/2009

$

175,000

7/9/2009

$

175,000

7/9/2009

$

200,000

7/9/2009 7/9/2009

$ $

300,000 450,000

9/9/2009

$

500,000

8/9/2009

$

1,100,000

11/9/2009

$

1,300,000

7/9/2009

$

294,000

O R

PP

1,000,000 Intersection of Wood/Dryden, south on Dryden to 277,000 Wigton Street

8/9/2009

6/9/2009

$

9/9/2009

Repaint Elevated Water Tank

This project would entail constructing a new transient dock at the Municipal Marina to handle 30 boats. The project would include observation platforms and a 8' wide public walkway along the waterfront. It would reduce the current waiting list at our marina. 5/9/2009 This project would entail constructing an addition to the District Library to ease severe overcrowding conditions. 7/9/2009 This project would include sandblasting and repainting the interior and exterior of the City's 200,000 gallon elevated water tank. 5/9/2009

City of Harbor Beach

Electrical Upgrade/Cord Connector for Auxiliary Generator

Emergency Predpardness

6/1/2009

8/30/2009

$

15,000

City of Harbor Beach

ER Ramp and Canopy

Handicap Access

6/1/2009

8/30/2009

$

30,000

City of Ludington

Ludington City

City of Ludington

Ludington City

City of Scottville

Scottville City

Harbor Beach Community Hospital, Inc. Harbor Beach Community Hospital, Inc.

m b u

S

02262009

Municipal Marina Transient Dock Project

District Library Addition

Submitted Requests - Not Approved

Route (Infrastructure Only)

903 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Suction/ Med Vacuum System

Patient Safety

5/1/2009

9/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

X-ray Room Renovation

Digital Radiology Suite

6/1/2009

10/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Doors in Hospital

Building Repairs

7/1/2009

12/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Plumbing Renovation

Energy Savings

5/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Floors in Hospital

Building Repairs

Scanning

Upgrade current scanning system and offer scanning capabilities to other County departments, progressing towards paperless document processing, retention and archiving.

North Sanitary Sewer District

Plan to make sewer service available to owners of property in the village, north of the downtown. These properties have water service but has not been availed of sewer. Most of the property is not suitable for septic systems and those homes have to pump and haul sewage. Summer 2009

Newaygo County

Village of Lexington

Newaygo County, White Cloud, MI

Village of Lexington, Lexington Township

City of Bridgman

City of Bridgman

City of Montague

Montague City

City of Montague

Montague City

T O

s t s

80,000

8/1/2009

$

100,000

7/1/2009

12/1/2009

$

600,000

immediate

9/1/2010

$

160,000

Summer 2010

$

1,500,000

e t tt

Outpatient Center

i m

32nd Street Reconstruction

ub

O R

P P A

Dicey Street Road Reconstruction and Water Reconstruct Dicey Street and install 12" water main between Stanton and Eilers Road Main Installation in conjunction with a proposed expansion for Montague Public Schools. 7/9/2009 New Office Space

D VE $

-N

R d

42,000

45,000

e u

City of Montague Montague City Deckerville Community Hospital Deckerville Deckerville Community Hospital Deckerville Webber Township in Lake Lake County EDC County

$

$

The project includes the full depth milling and resurfacing of 1,500 feet of Lake Street with 5" of HMA from Pine Street to Red Arrow Highway along with curb and gutter and sidewalk repair as needed. It also includes a new arched mast arm supported, video Lake Street Resurfacing and Lake Street/Red camera operated traffic signal at the Lake Street/Red Arrow Highway intersection. Arrow Highway Traffic Signal ADA compliant ramps will be installed at all sidewalk/curb intersections. 5/15/2009 Dowling Street and Old Channel Trail Hill Reconstruct Dowling Street between Meade and Ferry Street and Old Channel Trail Reconstruction between Dowling and Church Street 7/9/2009 Install 12" water main along Eilers Road between Dicey and Cook Street to provide Eilers Road Water Main more reliable service in the area

eq

Funding Request

11/15/2009

$

Lake Street from Pine Street to Red 671,000 Arrow Highway

8/9/2009

$

130,000 Dowling Street

$

320,000 Eilers Road

10/9/2009

$

550,000 Dicey Street

Handicap Accessible Office Space- Replacement/upgrade

7/1/2009

5/1/2010

$

195,000

Ambulatory Care Building - New Construction 32nd street is the access road to the GEO prison under construction and the proposed Bio-Diesel Plant

7/1/2009

8/1/2010

$

5,250,000

2009

2009

$

650,000

Pleasant Plains Township Baldwin Industrial Park Sewage Treatment in Lake County Upgrade Newaygo County, White Cloud, MI Orthophotography-GIS flyover

This upgrade is needed to serve the added wastewater created by the opening of the GEO prison 2009

2009

$

1,250,000

New County-wide GIS orthophotography flyover.

5/1/2011

$

90,000

Northern Michigan Univeristy

Marquette

Graduate Facility for Art and Design

An addition to the existing School of Art and Design providing studios, critique rooms, offices and graduate exhibition space to facilitate a new Master of Fine Arts with Specialization in Entrepreneurship degree. 6/1/2009

12/4/2009

$

2,200,000

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Generator

Emergency Predpardness

6/1/2009

8/30/2009

$

40,000

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Roof for Administrative Building

Energy Savings

6/1/2009

8/30/2009

$

50,000

Lake County EDC Newaygo County

02262009

S

Submitted Requests - Not Approved

immediate

Route (Infrastructure Only)

904 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

HVAC - Dietary

Renovation/HVAC

6/1/2009

8/30/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Roof Top AC for OR

Renovation/HVAC

6/1/2009

8/30/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Roof - Center Hall of Hospital

Energy Savings

6/1/2009

7/1/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Assisted Living - 32 units

New construction

7/2/2009

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Replacement Facility

Complete replacement of existing hospital and structures, dating back to 1920.

Wayne County

Construction of Improvements to Ecorse Creek Pollution Abatement District regional Taylor, Dearborn Heights sanitary sewer system

Funding Request

$

50,000

D VE $

75,000

$

350,000

9/2/2009

$

2,750,000

7/1/2011

$

20,000,000

Construction of planned FY09 rehabilitation and modernization improvements for the Taylor Basin and Jackson St pump station of the Ecorse Creek Pollution Abatement Design Underway; District, including: pump rebuild with stainless steel impellers, ventilation construction improvements, basin structural improvements, upgrade outdated instruments, replace immediately instrument panels, replace existing generators, and building structural repairs. following 9/30/2011

$

6,340,000

Funding is being sought for the remediation of this park which has been impacted by lead, methane and other contaminants. This park is owned by the county and operated by the city, and historically is Westland's largest and most used park. Until it was closed in December, 2006 because of the discovered contamination, it served many thousands of people annually that participated in a variety of recreational activities. It is also the site of the city's annual 4th of July celebration. The remediation and restoration of this recreational asset has been designated as the number one priority of the current city administration. The Response Activities plan for phase one in the eastern portion of the site will include placement of an exposure barrier on areas impacted by unacceptable surficial lead levels, including a geotextile layer covered by at least 12 inches of soil, and methane mitigation modalities. After remediation, restoration plans by the city include adult and youth soccer fields, open-air pavilions and a comfort station/concession stand. Summer, 2009

$

2,000,000

T O

O R

P P A 8/1/2009

N s

Route (Infrastructure Only)

t s e

Wayne County

City of Westland, Wayne County, Michigan

City of Brighton City of Brighton Deckerville Community Hospital Deckerville Fowler Village of Fowler

City of Brighton Village of Fowler

City of Hart

Hart Public Schoos, Hart City

02262009

R d

Westland Central City Park

e t tt

Fall, 2009

Main Street & Grand River Re-Construction

The reconstruction of crosswalks, traffic lights, streetscaped corners, and pedestrain safety measures for the heart of downtown Brighton. Pedestrain Safety measures include crossing signs, raised crosswalks, ADA compliant tactile warnings, pedestrain lighting, and new mast arm poles.

Construction can commence on or Construction can about May 1, be complete by 2009 July 1, 2009

$

664,000 NA

Expand Patient Parking Local Streets

Demolition/Parking lot - renovation for patient parking Crush & shape w/ new bituminous pavemen

8/1/2010 7/1/2009

10/31/2010 11/1/2009

$ $

100,000 200,000

N. Second St. Water Main Replacement Sidewalk Installation

120 days from Construction new 8-inch water main to replace old (circa 1938) 6-inch water main and authorization of associated appurtenances on N. Second St. from Advance St. to Center St. funds Placement of 1200 LF of new sidewalk 7/1/2009

45 days from start of construction 10/1/2009

$ $

430,000 NA 30,000

Johnson Street Extension

This project would consist of an extension of Johnson Street to 72nd Avenue to enhance safety to students and pedestrians, and security of the Hart Public School campus.

$

Johnson Street between Peach Street and 72nd 389,000 Avenue

i m

ub

S

City of Brighton Fowler

u q e

Submitted Requests - Not Approved

June'09

9/9/2009

905 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Ludington

City of Ludington

Project Name

Project Description

Start Date

This project would entail constructing a new outdoor public ice rink in downtown Ludington. The project would include a pavilion covering over the rink to protect it from the elements along with a cooling system. The project would encourage more people to visit downtown and shop at the local retailers.

Ludington City

Ice Rink

Ludington City

This project would entail repaving Loomis Street between Rath Avenue and Delia Loomis Street & William Street Reconstruction Street and repaving South William Street between Ludington Avenue and Filer Street. Project It would include new curb and gutter, new water and sewer utilities, and new sidewalk.7/9/2009

Ludington City

Dowland Street Reconstruction Project

This project would entail repaving Dowland Street between Washington Avenue and Rath Avenue. It would include new curb and gutter, new water and sewer utilities, and new sidewalk. 7/9/2009

Ludington City

North Staffon Street Reconstruction

North Staffon Street between Ludington Avenue and Tinkham Avenue would be reconstructed with new pavement, new curb & gutter, new sidewalk and new water and sewer utilities.

Ludington City

This project would entail repaving S. Washington Ave. between Ludington Ave. and Foster St. and repaving West Tinkham Ave. between William St. and Lakeshore South Washington Avenue & Tinkham Avenue Drive. It would include new curb and gutter, new water and sewer utilities, and new Reconstruction Project sidewalk.

Ludington City

T O

8/9/2009

$

650,000

10/9/2009

$

650,000

7/9/2009

10/9/2009

$

750,000

7/9/2009

10/9/2009

$

800,000

South Washington Avenue Reconstruction Project No. 2

10/9/2009

$

850,000

11/9/2009

$

1,500,000

6/1/2009

8/30/2009

$

25,000

6/1/2009

8/30/2009

$

45,000

Tuck point and seal

7/1/2009

9/1/2010

$

125,000

Meet New Regulatory Requirments

5/1/2009

9/1/2009

$

135,000

-N

New Fire Station

City of Harbor Beach

Administrative Parking Lot

Employee Support

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Upgrade Hospital Parking Lots

Patient Support

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Repair Exterior

Harbor Beach Community Hospital, Inc.

City of Harbor Beach

Extended Care Rehab Sprinkled

Village of Cassopolis

u S

Village of Cassopolis

02262009

10/9/2009

This project would entail repaving South Washington Avenue between the bridge and Sixth Street. It would include new curb and gutter, new water and sewer utilities, and new sidewalk. 7/9/2009

Ludington City

Village of Cassopolis

O R

P P A

Harbor Beach Community Hospital, Inc.

Village of Cassopolis

D VE

500,000

City of Ludington

Village of Cassopolis

11/9/2009

Funding Request

$

This project would entail purchasing property upon which the City already has an option and constructing a new fire station, so that the site of the existing fire station can be used to construct a new office building, which will result in approximately 100 jobs moving into downtown Ludington. 6/9/2009

Village of Cassopolis

Expected Completion Date

eq

e u

R d

e t t

it

s t s

Depot St. Lift Station Project

The Project consist of replacing an existing lift station including pumps and control panel. The existing station frequently fails causing spills forcing the village to have to utilize its bypass pump.

Lift Station #1 Project

The Project consist of replacing the existing 24+ year old lift station located at the beginning of the interceptor running through the Village of Cassopolis on its way to the Dowagiac WWTP. The existing lift station frequently beaks down forcing the village to use a bypass pump.

Lift Station #2 Project

The Project consist of replacing the existing 24+ year old lift station including pumps and control panel currently serving a design population of roughly 4370. The Village frequently has to utilize a bypass pump to make repairs to the old pumping system.

bm

Submitted Requests - Not Approved

$

Route (Infrastructure Only)

Depot St. between E State St. and E Water St. Village 65,000 of Cassopolis MI

$

Pokagon Hwy @ Lakeview Court Village of 125,000 Cassopolis MI

$

Peavine St. @ Oak Grove Rd. Village 125,000 of Cassopolis MI

906 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

$

M-62 west of Dutch Settlement St. Village of 125,000 Cassopolis MI

$ $ $

Meade, Dowling 1,810,000 and Wilcox Streets 20,000 100,000

Brighton Parking Structure

Construction can A 100 car, 3 level parking structure in downtown Brighton to support the numerous Construction can be complete by restaurants, stores, and offices in the area. Construction to be brick façade over pre- commence on or December 30, cast concrete structure. about July 6, 2009 2009

$

3,550,000 NA

Hospital Renovationi

Ambulatory Care Backfill - Renovation of space

2/28/2011

$

1,000,000

Replacement of Hamtramck outdoor ice rink

The outdoor ice rink was widely used every year. Due to age, the chiller units need to be replaced as they can no longer be repaired. As part of the project we want to add a warming house and washrooms. 5/1/2009

October 31,2009

$

2,000,000

Southeast Michigan Regional Energy Office City of Hamtramck

New City of Hamtramck Fire Station

Currently the Fire Department is housed in a 75+ year old facility, Numerous repairs have been done simply to keep the facility operational. Upgrades have not addressed the need for upgrading equipment, enhanced facilities for equipment maintenance or training for the fire fighters. Upgrading is no longer a viable option, only replacement will work. 8/1/2009

7/31/2010

$

6,000,000

Southeast Michigan Regional Energy Office City of Hamtramck

The current City Hall is housed in an old, historic hospital building. While many upgrades have occurred, much more work is required in order to complete the Rehabilitation of Hamtramck City Hall Building renovation and to make overall operations more efficient.

4/1/2009

3/31/2010

$

8,000,000

Currently the Hamtramck City Hall is housed in an old, historic hospital building. We have on old store which has the size and location that would be perfect for a new City Hall. If approved the current city Hall would be remodeled and converted for housing. 4/1/2009 Replace storm sewer 7/1/2009 Replace storm sewer 6/1/2010 Sanitary sewer rehabilitation - lining 7/1/2009 Reconstruction and widening of 600 feet of VanWagoner Road, new cantilever signals and a new rubber crossing 7/1/2009

3/31/2010 9/15/2009 8/15/2010 7/1/2010

$ $ $ $

10,000,000 150,000 170,000 600,000

9/1/2009

$

Connect Maple Street with Ridge Avenue, 1,000 feet of watermain to loop.

7/1/2009

12/31/2009

$

Village of Cassopolis

City of Montague Lake Township Lake Township

Village of Cassopolis

Montague City Lake Township Lake Township

City of Brighton City of Brighton Deckerville Community Hospital Deckerville Southeast Michigan Regional Energy Office City of Hamtramck

Southeast Michigan Regional Energy Office City of Hamtramck Village of Fowler Fowler Village of Fowler Fowler Village of Fowler Fowler

Lift Station #3 Project

The Project consist of replacing the existing 24+ year old lift station including pumps and control panel currently serving a design population of roughly 4870. The Village frequently has to utilize a bypass pump to make repairs to the old pumping system

Downtown Water Transmission Main generator tower

Install a 12" water main from downtown Montague, along Dowling Street to Meade Street, then south west to Wilcox Street, then west along Wilcox Street to the existing main at Cook Street. This project is a recommended improvement in the City's Water Reliability Study which was submitted to the MDEQ. Gen erator electric twnship buildings 2009 new radio,siren tower 2009

T O

P P A

O R

N s

t s e

8/15/2010

u q e

2010 2009

D VE

City of Ferrysburg

Ferrysburg City

Rehabilitation of Building for New Hamtramck City Hall Storm Sewer Replacement, Ph. 1 Storm Sewer Replacement, Ph. 2 Sanitary Sewer Lining VanWagoner Road railroad safety crossing project

City of Ferrysburg

Ferrysburg City

Maple Street extension

City of Ferrysburg City of Ferrysburg

Ferrysburg City Ferrysburg City

Sanitary Sewer Upgrade Lift Station

Upgrade sanitary sewer pipe that is at capacity and serves two (2) communities Rebuild pumps, add variable speed drives, upgrade controls

7/1/2009 7/1/2009

12/1/2009 12/1/2009

$

North Shore Road 1,000,000 to Lift Station #1 Lift Station No. 1

Bryant Road Reconstruction Project

This project would entail repaving Bryant Road between Lakeshore Drive and North Washington Avenue. It would include new bike lanes, new curb and gutter, new water and sewer utilities, and new sidewalk. 7/9/2009

11/9/2009

$

1,400,000

Senior Center/Assisted Living

St. Ann's Senior Center has operated a Meals Program for many years. They would like to re-build their Center with a small auditorium, rec room and multi-purpose room. Also, Lake County has no Assisted Living facility and St. Ann's would like to build one as part of the new Senior Service center 2009

2010

$

6,050,000

City of Ludington

LCEDC

Baldwin

02262009

e t tt

i m

ub

S

Ludington City

R d

Submitted Requests - Not Approved

400,000 Railroad crossing Maple Street to 600,000 Ridge Avenue

907 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Conversion of Decorative Street Lighting to LED Type

Conversion of conventional street lighting systems and decorative or "downtown" lighting systems to LED lighting is a proven method of immediate energy savings and short turnaround on recovery costs of conversion expense. Within 180 days

Approx. 180 days after start

$

250,000

Monitor Sustainable Water Use Operation

The City of Grosse Pointe Farms is in the unique position of providing water to our residents and neighboring communities through our own water treatment facility. As a conscious user we should also be mindful of how we return our consumption back to the environment. Closely monitoring the waste and storm-water runoff will provide us with the information needed to determine our impact and identify problems in the system (such as leaks and/or main breaks) and verify the needs of the community are being met in an efficient manner. Within 180 days

Within one year followed with ongoing monitoring $

250,000

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

Wind Boxes and Solar Collection Panels

Proper placement of “micro” turbine wind energy collection boxes will provide long term energy collection and supply to supplement Street lighting, traffic signals, sprinkler system controls, storm-water monitoring equipment

Approx. 180 days after start

$

500,000

Southeast Michigan Regional Energy Office Lathrup Village

City of Lathrup Village Geothermal Update

Replace inefficient city hall HVAC with geothermal system

$

602,682

Southeast Michigan Regional Energy Office Mt. Clemens

Rehabilitation of Edison Train Station

Historic rehabilitation of city-owned 1859 train station to retain and expand Michigan Transit Museum.

2/9/2009

12/10/2009

$

1,750,000

Green Gutter and Roof Parking Facility

The construction of a “green gutter and roof” parking structure will provide relief for congested parking district reducing the “drive//search” time for users and help in filtering vehicle emissions and storm-water runoff.

Within 180 days

1 year after start

$

2,500,000

Porous Pavement Parking Lots

Porous pavement allows water to infiltrate through it thereby reducing the volume/rate of storm water runoff and pollutants. Installation of porous pavement demonstrates City support and leadership in the use of environmentally friendly best management practices that improve and protect water quality. Reductions in winter salt application and associated costs have been experienced in other areas that utilize porous pavement. This project consists of constructing porous pavement parking lots at the following facilities: Founders Park Ballfield Lot, Founders Skate Park/Soccer Lots, Heritage Park Playground Lot and Heritage Park Handicap Amphitheatre Lot.

$

2,850,000

$

8,000,000

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

Southeast Michigan City of Grosse Pointe Regional Energy Office Farms

s t s

T O

O R

P P A

-N

Within 180 days

D VE

Route (Infrastructure Only)

e u

Southeast Michigan Regional Energy Office City of Farmington Hills

d e tt

ub

t i m

Southeast Michigan Regional Energy Office City of Farmington Hills

City Hall Revitalization Project

q e R

Currently Farmington Hills’ City Hall, with its 14 separate HVAC systems, is an extremely energy inefficient building with an Energy Star Score of 38/100. The revitalization project will consist of a complete renovation and some new space making way for a more functional and efficient municipal building. With the use of a ground source heating and cooling system, more efficient lighting, daylighting, graywater reclamation, green roofs, renewable energy and many other sustainable design features, we are expecting large efficiency gains. Further, this project will be used to promote sustainable concepts throughout the community and region. Currently this project is tracking LEED NC Certification at the Gold Level.

June/July 2009

S 02262009

Submitted Requests - Not Approved

908 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Chippewa Indian Tribe

Sagning/Standish

Project Name

Project Description

Start Date

Expected Completion Date

Sagning Water and Waste Water Development

The Saginaw Chippewa Indian Tribe of Michigan consists of two reservations. The larger of the two is located in Isabella County and is the Tribal Government seat. The Saganing Reservation is located in Arenac County. Arenac County is primarily a rural community with very little new growth in business. Recently the Tribe built a small casino on The Saganing reservation. This small casino now employees 300 people and is attracting more interest in the area. To support future development of The Saganing reservation the Tribe needs to develop the proper infrastructure. The Saginaw Chippewa Indian Tribe has projected a growth that will create a demand for 150,000 gallons per day. To meet this need it is recommended that The Saginaw Chippewa Indian Tribe develop and operate a Water Treatment Plant and a Waste Water Treatment Plant. With the plants in place the Tribe will be able to expand operations in multiple directions creating hundreds of employment opportunities in this economically depressed region. With the rise of unemployment in Michigan and theAs soon as 24 months from opportunity to promote growth, The Tribe is in a position to create a win-win scenario. permiting is done start

O R

T O

P P A

Village of Cassopolis

Village of Cassopolis LaGrange Township

Village of Cassopolis Municipal Complex Project

The project consist of demolition of the existing DPW building, construction of 11,100 SFT Fire Station, 8,000 DPW Garage, 1,600 SFT Salt Storage Building, and the required site work. The project will provide much needed facilities for the Cassopolis Fire Department, Cass Area Ambulance Service, Cass county Advanced Life Support and the DPW.

Wayne County

Dearborn Heights, Livonia, Northville Twp., Westland

Restoration of Wayne County Wetland Mitigation Bank

Restoration of existing wetlands and creation of new wetlands in the Wayne County Wetland Mitigation Bank for public benefit and improved environmental quality.

Southgate, Wyandotte

Construction of planned improvements to the Southgate-Wyandotte Drain District regional sanitary sewer system. Improvements include automation of both pump stations of the system with new primary and secondary level devices, transmitter, Construction of Capital Improvement Projects programming, power monitoring system improvements at No. 5 and a power for Southgate-Wyandotte Regional Sanitary monitoring system at Pine Street, new wet well valves and actuators, automatic wet Sewer System well flushing system, SCADA screens, control logic and interlocks.

s t s

-N

Funding Request

Route (Infrastructure Only)

D VE $

26,400,000

$

Village owned property just west of existing DPW site with access to Pokagon Highway 3,500,000 and Disbrow St.

4/1/2009

6/30/2010

$

1,500,000

3/1/2009

9/30/2011

$

4,056,000

Construction of FY09 improvements for Downriver Sewer System Bray Lake Conference Center Seven Mile Road

Construction of planned FY09 improvements to Downriver Wastewater Treatment Facility. Work includes aeration train structural rehabilitation, electrical improvements throughout the facility, influent pump station flow control improvements, and primary settling tank improvements. New conference and training and lodging facility for Lake County resurface Seven Mile Road from Gratiot to Hayes

Design Underway; construction immediately following 9/30/2011 2009 2010 9/9/2009 11/9/2009

$ $ $

12,800,000 5,200,000 557,700

Heliport

Establish Transfer Heliport - New Construction

9/1/2009

5/1/20010

$

2,500,000

Ludington City

North Concession Stand Replacement

This project would tear down and replace the existing north concession stand and restrooms at Stearns Beach, which is the City's most popular beach. The existing concession stand is in poor condition and none of the bathrooms are ADA-compliant. 8/9/2009

11/9/2009

$

200,000

Ludington City

Wastewater Treatment Plant Outfall Pipe Relocation

This project would extend and relocate the Wastewater Treatment Plant's outfall discharge pipe in order to bring the City into compliance with expected changes to our National Pollutant Discharge Elimination System (NPDES) permit. 8/9/2009

11/9/2009

$

800,000

e u

Wayne County

Allen Park, Belleville, Brownstown Twp., Dearborn Heights, Ecorse, Lincoln Park, River Rouge, Riverview, Southgate, Taylor, Van Buren Twp., Wyandotte Webber Twp Detroit

Wayne County Webber Township Wayne County Deckerville Community Hospital Deckerville

City of Ludington

City of Ludington

t i m

ub

S

02262009

d e tt

q e R

Submitted Requests - Not Approved

909 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ludington

City of Ludington

Ludington City

Ludington City

Project Name

South Washington Avenue Bridge Replacement

Water Treatment Plant Upgrades

This project would entail constructing new filters at the Water Treatment Plant in order to increase the quantity and quality of water treatment. Currently, if one of the two existing filters goes out of service, the City would be unable to meet its peak summertime demand for water. 11/9/2009

Water Transmission Main Extension Palmer Road

This project would entail constructing a new water transmission main between the cities of Ludington and Scottville to handle the increase in commercial growth in and between the two cities. 8/9/2009 resurface Palmer Road from Lilley to Haggerty 9/9/2009

Ludington City Canton Twp

Wayne County

Taylor, Dearborn Hieghts Van Born Road

Wayne County Wayne County Wayne County Wayne County Wayne County Wayne County

Southgate Westland Westland Plymouth Twp Dearborn Heights Plymouth Twp Dearborn Heights, Redford Twp Westland Romulus Livonia Dearborn, Detroit Grosse Pointe Farms, Grosse Pointe Shores Romulus Canton Twp

Wayne County Wayne County Wayne County

02262009

1,800,000

$

5,500,000

12/9/2009 11/9/2009

$ $

5,700,000 363,000

9/9/2009

11/9/2009

$

625,000

9/9/2009 9/9/2009 9/9/2009 9/9/2009 9/9/2009 9/9/2009

11/9/2009 11/9/2009 11/9/2009 11/9/2009 11/9/2009 11/9/2009

$ $ $ $ $ $

656,000 813,000 954,000 1,053,000 1,081,000 1,085,000

P P A

O R 5/10/2009

Joy Road Warren Road Middle Belt Road Middle Belt Road Greenfield Road

resurface Joy Road from Inkster Road to Beech-Daly Road resurface Warren Road from Wayne to Venoy resurface Middle Belt Road from Goddard to I-94 South Service Road resurface Middle Belt Road from 7 Mile Road to 8 Mile Road resurface Greenfield Road from Ford Road (M-153) to Warren Road

9/9/2009 9/9/2009 9/9/2009 9/9/2009 9/9/2009

11/9/2009 11/9/2009 11/9/2009 11/9/2009 11/9/2009

$ $ $ $ $

1,106,000 1,319,000 1,368,000 1,471,000 1,632,000

Lakeshore Drive Middle Belt Road CantonCenter Road

resurface Lakeshore Drive from Moross to Vernier resurface Middle Belt Road from Smith to Van Born reconstruct Canton Center Road from Palmer to Cherry Hil

9/9/2009 9/9/2009 9/9/2009

11/9/2009 11/9/2009 11/10/2009

$ $ $

1,868,000 1,984,000 3,412,200

24 months from start

$

2,800,000

b u S

T O

N s

t s e

qu

Saginaw Chippewa Tribal College Campus Construction Project

e R

The SCTC is seeking funding for the construction of a new college building to replace the two leased buildings that SCTC occupies now. Construction of a new facility for the tribal college will bring the college closer to the Saginaw Chippewa Indian Tribe (SCIT) and its community and the new design will allow for a more educationally engaging and culturally sensitive environment. SCTC is a two-year college, which was created as a non-profit corporation by the Saginaw Chippewa Tribal Council in 1998. The college was chartered as a public institution for all people in the community. Since inception, the Saginaw Chippewa Tribal College has evolved into an accredited higher education institution, granted by the Higher Learning Commission (HLC). In January 2007, the Facilities Planning Committee (FPC) was created to develop a master plan that will provide the college with improved and expanded facilities and resources over the next ten to twelve years. The SCTC Facilities Master Plan is a collection of projects and ideas that are ever developing and will serve as a framework within which other projects are built. The FPC has identified a variety of pr

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

Eureka Road Merriman Road E.N. Hines Drive North Territorial Road Warren Road Beck Road

t i m

Mt. Pleasant

12/9/2009

Funding Request

resurface Van Born Road from 0.5 mile weat of Monroe to Monroe resurface Eureka Road from 0.25 miles east of Toledo to 0.3 miles east of Trenton Road resurface Merriman Road from Ann Arbor Trail to Joy Road resurface E.N. Hines Drive from Ann Arbor Trail to Merriman Ramp resurface North Territorial Road from Beck to Sheldon 400 feet eaast of Inkster to 660 feet west of Beech-Daly resurface Beck Road from Powell to M-14 Freeway

d e tt

Saginaw Chippewa Indian Tribe

Start Date

This project would entail replacing the 41-year-old S. Washington Ave. bridge that is in poor condition. It would include raising the bridge approximately 2 feet to allow boaters greater access to local marinas, replacing about 200 feet of approach on each side of the bridge along with any necessary utilities, and include a 10' wide public walkway to link existing walkways by the waterfront. 8/9/2009

City of Ludington Wayne County

Wayne County Wayne County Wayne County Wayne County Wayne County

Project Description

Expected Completion Date

910 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Saginaw Chippewa Indian Tribe Wayne County Blackman Township Blackman Township

Mt. Pleasant Detroit, Grosse Pointe, Grosse Pointe Farms Blackman Twp Blackman Twp

City of Alpena

City of Alpena

City of Alpena

City of Alpena

Project Name

Project Description

Start Date

M-20 Expansion

The Saginaw Chippewa Tribe owns and operates gaming and tribal support facilities on the North and South sides of M-20 on the eastern fringe of Mt. Pleasant, Michigan The Tribe is in need of additional access to and from M-20 between Summerton Road and the signalized intersection of M-20 and Leaton Road to adequately develop additional property as well as to better serve existing facilities, with proposed facilities on the North Side of M-20. The Tribe has had productive meetings with various MDOT employees and divisions toward the understanding of the Tribes future plans and development potential in this project area. The proposed road would be a boulevard section linking the Soaring Eagle Resort & Casino, The Ziibiwing Cultural Center, the Soaring eagle Inn Complex and proposed new facilities to help stimulate the area economy. Quarterly meetings are held with MDOT and Tribal Staff to help the discuss issues with the M-20 corridor as the tribal enterprises expand. The estimated cost of the economic development road is $9-10 M, this would include the culvert over the drain and upgrades to 4 total intersections, with the roads connecting to Broadway

Mack Ave Fire Engine Rescue/Pumper New Public Safety Building

resurface Mack Ave from Cadieux to Moross Replace rundown fire engine Replace rundown public safety building that is too sma

Energy Efficiency Upgrades - City Hall Energy Efficiency Upgrades - Public Safety Facility

Honeywell has performed an energy efficiency study for the City of Alpena The improvements noted at City hall include Installing new controls to optimize performance, Replace heating and cooling system utilizing geothermal energy, Install new windows, upgrade lighting, Install instantaneous hot water system, and replace roof 8/1/2009 Replace boilers integrate control's with city wide management system, upgrade lighting fixtures 8/1/2009

s

st

A T

O N

9/9/2009 7/1/2009 7/1/2009

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

Sanitary Sewer Pump Station Replacement _ The existing Sanitary Sewer Pump Station is undersized and is functioning near Water Works capacity. The project would replace the entire pump station

City of Alpena City of Marysville

City of Alpena/Park Family Foundation Community Center Matching funds Marysville Marysville WWTP Upgrade

u S

itt

d e t

bm

q e R

Provide local matching funds to leverage privat foundation dollars to facilitate the development of a new energy efficient convention center Upgrade existing 33 year old waste water treatment plant

O R

PP

Install energy recovery systems in the make up air system, install digital and Energy Efficiency Upgrades Water Production automated controls, Install Variable Frequency Drives at the Water Plant and upgrade and Water Recycling Plants lightings 8/1/2009 Energy Efficiency Improvements - MIS Install zone controls to separate Server room from balance of the building, install Building digital controls, and upgrade lighting 8/1/2009 Implement a SCADA system at the water production plant to interconnect all elements of water production monitoring 9/1/2009 Water Production Plant SCADA System Implement a SCADA system at the water recycling plant to interconnect all elements Water Recycling Plant SCADA System of the water treatment process monitoring 9/1/2009

e u

Expected Completion Date

Funding Request

D VE

24 months from start

$

10,000,000

11/9/2009 1/1/2010 1/1/2010

$ $ $

1,800,000 550,000 3,000,000

12/1/2009

$

10/1/2009

$

750,000 City hall Public Safety 50,000 Facility Water production and Water 75,000 recycling Plants

10/1/2009

$

10/1/2009

$

12/1/2009

$

12/1/2009

$

25,000 MIS Building Water Production 125,000 Plant Water Recycling 150,000 Plant

9/1/2009

11/1/2009

$

US-23 at the Water 175,000 Production plant

10/1/2009 10/9/2009

6/1/2010 11/10/2009

$ $

Woodward Avenue 3,500,000 Development 10,705,000

Traffic calming and walkability changes to Bus US127 (Mission Road) South to increase safety and access for both automobiles and pedestrians. Measures to Infrastructure/Walkability: Bus US127 (Mission include - boulevards, cross-walks, bike lanes, widening sidewalks, and narrowing Road) lanes.

9/1/2009

12/31/2011

$

Streets: Mission Road (Business 3,000,000 US127)

City of Mt. Pleasant

City of Mt. Pleasant

City of Munising/DDA City of River Rouge

Munising River Rouge Madison Township, Lenawee County

Landmark Building Renovation Demos and Housing Rehabilitation

Joint Project to renovate large downtown landmark building for retail development Demolition of Blight and Rehabilitation of Foreclosures

4/27/2009 6/1/2009

6/1/2010 4/10/2009

$ $

1,300,000 1,000,000

New Township Offices

New Township Offices, Meeting and Voting Facilities

8/1/2009

4/1/2010

$

1,500,000

DeTour Village

Replacement of Grinder Pump Stations

Replacment of 12 wastewater ginder pump stations in their entirety.

8/9/2009

11/9/2009

$

172,500

Madison Township Village of DeTour Village

02262009

Route (Infrastructure Only)

Submitted Requests - Not Approved

911 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Village of DeTour Village DeTour Village Village of DeTour Village DeTour Village

Project Name

Project Description

Replacement of Lift Station #3

Remove and replace waste water lift station. Upgrade existing high pressure filters with low pressure filters and add one low pressure filter

Water Plant Improvements

Production Well, Well House Bldg. & Water Main

Village of Schoolcraft

40040

City of Alpena

City of Alpena

City of Alpena

Start Date

11/9/2009

$

212,750

8/9/2009

7/10/2009

$

220,000

1,320,000

12/1/2009

$

250,000

10/1/2009

$

50,000

9/1/2009

11/1/2009

$

200,000

1/1/2010

3/1/2010

$

9/25/2009

$

200,000 Streets: Mosher

10/30/2009

$

Streets: Woodworth, Fordyce, Sampson, Lansing, Kinney, 950,000 Washington

12/18/2009

$

550,000

9/9/2009

$

1,800,000

11/9/2009

$

130,000

7/9/2009

11/9/2009

$

3,000

9/1/2009 8/15/2009

9/1/2012 11/15/2010

$ $

225,000 11,160,000

8/9/2009

Fall 2011

$

3,900,000

City of Alpena

City of Alpena

Water Production Plant Boiler Replacement

Replace the steam boiler and heating system with a geothermal heat system

City of Alpena

Thunder Bay Transportation Authority

Thunder Bay Transportation Authority

Implement alternantive energy or fuel busses for regional transportation system

City of Mt. Pleasant

City of Mt. Pleasant

Downtown Revitalization/Walkability: Jockey Alley Redevelopment

Redevelop underutilized area between Mosher & Jockey Alley from Main to Franklin to improve parking access for downtown businesses and pedestrian safety. 6/15/2009

City of Mt. Pleasant

Infrastructure Improvement: Street Reconstruction

Place curb, gutter and asphalt on the last remaining gravel streets in the city: Woodworth, Fordyce, Sampson, Lansing, Kinney & Washington. Paving these streets will reduce the amount of sand/gravel entering the storm system and Chippewa River. It will also reduce dust pollution and make the area more attractive for private development. 6/22/2009

City of Mt. Pleasant

Electricity Generation Project. The wasted heat from the waste water treatment Infrastructure Improvement/Green: Electricity process would be utilized to generate electricity which would operate a 250 KW Generation Project generator. This project would generate electricity and reduce overall carbon footprint. 7/20/2009

City of Mt. Pleasant

City of Mt. Pleasant

City of River Rouge Village of DeTour Village Village of DeTour Village

City of Fremont Cooper Township Independence Township

River Rouge

S

DeTour Village

e t tt

Replace existing 48 year old heating and AC system , Make energy conservation improvements to A LEED standards. Make site improvements to achieve more sustainable project using techniques and features such as rain gardens , porous pavements , water reuse and reduction ,water efficient landscaping. no potable water Energy Conservation projects at the City Hall for irrigation ,LED lights ,Pedestrian friendly layout. 8/9/2009 Removal of Infiltration/Inflow (I/I) in Sanitary Perform a Sewer System Evaluation Study (SSES) to determine the areas with inflow Sewers and Manholes and repair approximately 45 manhole structures. 8/9/2009

i m

Treatment Plant Capacity Study

Fremont City Cooper Township

Fremont School Resource Officer Program (Police) Brackett Ave. Area Sanitary Sewer

Independence Twp.

Sewer Expansion

02262009

eq

R d

ub

DeTour Village

A T

e u

Perform a waste water treatment plant capacity study to estimate the quantity of I/I verses winetr let runs and determine the best course of action for correction Fremont Public Schools and the Fremont City have identified a need for a School Resource Officer. Funds will be used to implement Fremont's first School Resource Officer for a three (3) year program serving nine (9) schools. Construction of sanitary sewer in Brackett Avenue Area 6.9 miles of sanitary sewers along lakes with aging septic systems leaching into waterways

Submitted Requests - Not Approved

Installing a production well and well house building at the Schoolcraft Township Hall and extending water main to alternative well site. Water Recycling Plant Water Recycling Plant Water Production Plant

$

PP

City of Alpena

st

O R

D VE

Route (Infrastructure Only)

Production Well, Well House Bldg. & Water Main

Methane Gas Storage Variable frequency Drive Units for Electric Motors

O N

Funding Request

8/9/2009

Schoolcraft Village 11/15/2010 We presently waste excess methane this system will allow us to capture and store the methane for later use 9/1/2009 Install Variable Frequency Drive Units on the electric motors at the Water recycling Plant for efficiency and smoothing of the plant flows 8/1/2009

s

Expected Completion Date

2,000,000 City Wide

912 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County

Big Prairie Township, Newaygo County

Lincoln Township, Newaygo County Newaygo County Newaygo County Road Newaygo County Road Commission Commission Section 4 Northville Northville Township Township Section 4 Northville Northville Township Township Section 10 Northville Northville Township Township Section 10 Northville Northville Township Township

Southeast Michigan Regional Energy Office Ferndale

Project Name

Sandy Beach County Park Improvement

Sandy Beach is an important destination park on 4,000 acre Hardy Pond. It has a funded project of $448,000 to begin park improvements including paving one mile of roadway, utility service to 22 campsites, picnic shelter, boat launch dock, and 2 camping cabins. Additional improvements remaining to be funded include: pave remaining interior roads (225,000), electric service to 90 campsites (150,000), replacement of aged toilet/shower building (300,000), provide public contact station (60,000), 2 vault toilets (20,000), and maintenance/storage garage (20,000). 9/30/2009

Diamond Lake County Park Improvement

Diamond Lake sits on 156 acres of land purchased by Newaygo County in 2008 for $1,200,000. This site was formerly an abandoned private recreation area. A number of improvements are needed for this facility to effectively serve as a public park. This project would provide for a public contact station (75,000), day use road and parking (100,000), level and construct camping pads on camp sites (50,000), develop boat launch (75,000), construct 2 vault toilets (20,000), grading and sign at entrance (5,000). 9/30/2009

Complex improvements Clement Road/ Main Street Sanitary Sewer Extension

02262009

T O

Meadowbrook Sanitary Sewer Extension

Streetlight Conversion to LED

The City of Ferndale owns 255 street lights consisting of sodium and metal halide lighting throughout several developed corridors in the City. Conversion/retrofit of these light fixtures to light emitting diode (LED) would reduce energy consumption by approximately 75%. This project would retrofit 255 street lights to LED lighting and reduce energy consumption and cost. 2009

Norton Neeson, Frederick, Sunset Pickford Road Water Main Phase III and Thornapple Sanitary Sewer Extension

s t s

7/9/2009

R d

e t t

S

m b u

West Vernor Cultural District

Redevelopment of an abandoned building to accommodate a local theatre performance space and retail uses. Flexible design will enable the theatre space to show evening events and be used for education and programing during the day. Proposed additional retail uses include child care+K2 facilities and an organic food retailer and eatery. The building will be an adaptive reuse and focus on affordable rents for startup and community businesses. Business training and incubator will encourage small business growth and development

Submitted Requests - Not Approved

7/1/2009

Funding Request

1,198,000

9/30/2010

$

325,000

9/10/2009

$

350,000

$

798,000

$

897,600

$

982,450

$

1,516,200

2010

$

382,500

9/9/2009

$

1,800,000

6/1/2010

$

2,500,000

O R

Route (Infrastructure Only)

D VE $

-N

e u

eq

9/30/2010

P P A

Improve energy efficiencies of building and complex Extending sanitary sewer service to a developed section of the township with onsite sewage disposal Extending sanitary sewer service to a developed section of the township with onsite sewage disposal Removing and replacing the remaining section of cast iron water main. This project would conclude the design of this replacement. Removing and replacing the remaining section of cast iron water main. This project would conclude the design of this replacement.

it

Detroit

Start Date

Replace existing 48 year old heating and AC system , Make energy conservation improvements to A LEED standards. Make site improvements to achieve more sustainable project using techniques and features such as rain gardens , porous pavements , water reuse and reduction ,water efficient landscaping. no potable water Energy Conservation projects at the City Hall for irrigation ,LED lights ,Pedestrian friendly layout. 8/9/2009

Southeast Michigan Regional Energy Office River Rouge

Southwest Housing Solutions

Project Description

Expected Completion Date

913 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County City of Grand Haven City of Marysville City of Marysville City of Marysville City of Marysville Madison Township

Wayne County Detroit, Michigan Grand Haven City Marysville Marysville Marysville Marysville Madison Township, Lenawee County

Project Name

Project Description

Start Date

Local Government Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: In 2005, Wayne County took on the challenge of planning for a Regional Justice Complex (RJC). Currently, the County has 17 buildings that house inmates, courts, and the Sheriff's Department. Consolidating these operations to a green building will provide an annual savings of approximately $40 million. So far, $2,064,000 has been spent to develop plans by a firm that was selected through a Request For Bid Process. The firm has provided the information needed for Wayne County to move towards building the complex but due to the economic situation that we are now facing, the RJC project has been put on hold indefinitely. Building the RJC will allow Wayne County to close down some of its older buildings that are very costly to operate and move their operations into the new state of the art, energy effieceint complex which will use "Green Technology". Streamlining WCR - 1 (Wayne County Construction Project operatins to achieve efficiency is a priority for the county. Construction of the RJC will #1) create hundreds of construction jobs for a sustained period. The new facility would be 7/1/2009 Harbor Dr. Full Reconstruction Water, sanitary, storm and roadway, Sherman to Prospect Fall 2009 Sanitary Sewer Rehabilitation rehabilitate existing sanitary sewer lines 10/9/2009 WWTP Storage construct wet weather storage facility at the waste water treatment plan 10/9/2009 Water Treatment Plant Upgrade upgrade existing water plant equipment and transmission system 10/9/2009 Seawall Repair repair failing seawall along St. Clair River ~400 lineal fee 10/9/2009 Curb, Gutter storm Drain Project Airport Subdivision Add Curbs and Gutters and Storm Drain System to the Airport Subdivision 9/1/2009

T O

s t s

O R

P P A

-N

Pinnacle Aeropark will be a 1,200-acre mixed use tech park to be developed with R&D facilities, corporate headquarters, logistics centers, communication and inforamtion centers and general office and retail psace all supported with new infrastructure between the Detroit Metro and Willow Run Cargo airports along the I-94 & I-275 corridors. This is a regionally supported economic development project, which land use studies have shown will generate significant economic output to Southeast Michigan. Funding of the utility and roads infrastructure is a critical piece is starting the project. This request for $4.0 MM is for the installation of utilities in the rights of way along existing roads in proximity of Pinnacle Aeropark. June 15 2009

e u

eq

Expected Completion Date

Funding Request

Route (Infrastructure Only)

D VE

7/1/2013 2010 11/10/2009 11/10/2009 11/10/2009 11/10/2009

$ $ $ $ $ $

750,000,000 1,814,000 4,320,000 7,025,000 2,790,000 1,500,000

5/1/2010

$

1,200,000

Dec.15 2009

$

4,000,000

Wayne County

Huron Twp.

Detroit Region Aerotropolis- Pinnacle Aero Park

City of Alpena

City of Alpena

Ninth Avenue Water Tower Coating

8/1/2009

10/1/2009

$

Ninth Avenue 615,000 Water Tower

City of Alpena

The existing piping into the Ninth Avenue Water Tower goes through an abandoned vault and has several old lead in tee connections that need to be removed. This also Ninth Avenue Tower Piping and Pump House includes improving access into and through the bowl of the tower, and improvements Improvements to the pump house 8/1/2009

10/1/2009

$

Ninth Avenue 85,000 Water Tower

8/1/2009

10/1/2009

$

125,000 City Wide

This project would connect the 2 City owned water towers and the pump station to the plant via an internet connection in lieu of the present telephone system allowing for improved control and monitoring 8/1/2009

10/1/2009

$

50,000 City Wide

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Mt. Pleasant

02262009

i m

ub

S

City of Alpena

e t tt

Lift Station Telemetry

City of Alpena

City of Alpena

City of Mt. Pleasant

R d

Water Tower and Pump Station Telemetry

Recoat both the interior and exterior of the 750,000 gallon multi leg water tower

This project would connect the 11 sanitary sewer pump stations to the plant via an internet connection in lieu of the present telephone system allowing for improved control and monitoring

12/1/2009

$

Grant Street Reconstruction

The new bridge would be constructed of either wood and steel or concrete spanning the river and providing access to Island Park for pedestrians and small maintenance vehicles. 9/1/2009 Reconstruct the road way with muck removal, new subbbase and base amterial, curb and gutter, drainage improvements, and paving 9/1/2009

8/1/2010

$

Sportsman's Island 175,000 Park Addison Street to 850,000 Hobbs Drive

Infrastructure Improvement: Water Main Replacement

Replace old water mains throughout the city with new/larger mains to improve fire protection and water flow. New mains will improve water quality by eliminating corroded pipes and minimizing water main breaks that create potential contamination problems. 6/15/2009

10/23/2009

$

900,000 Throughout city

Sportsman's Island Bridge Replacement

Submitted Requests - Not Approved

914 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Mt. Pleasant

City of Norton Shores

City of Norton Shores

City of Mt. Pleasant

Norton Shores

Norton Shores

Project Name

Project Description

Start Date

Infrastructure Improvement:Crosswind Runway

Construct a 3500 foot Crosswind Runway to provide safe operating conditions for small aircraft during periods of high crosswinds on the runway.

Pontaluna Rd. Reconstruction

Reconstrucion of 2.2 miles of roadway including drainage improvements and some sidewalk.

Norton Avenue Reconstruction

Reconstrucion of 1.1 miles of roadway including drainage improvements and watermain replacement. Reconstrucion of 1 mile of roadway including drainage improvements and some sidewalk

7/27/2009

Grand Haven Rd Reconstruction

City of River Rouge

River Rouge

Water System Improvements

Muskegon County

Muskegon City

D to C forcemain

Replace old leaking and undersized water mains and install new water meters 8/9/2009 The old force main that was abandoned in 2008 needs to be filled with grout to protect local roads. summer

Ruddiman Sewer Rehab

An old main line gravity sewer serving the communities of Norton Shores, Muskegon City, and Roosevelt Park has been videoed and is in major need of lining. The first third of the work was done in 2008. summer

Troy Township, Lilley Township, Home Township, Barton Township, Beaver Township, Denver Township, Merrill Township, Monroe Township, Norwich Township, Lincoln Township, Wilcox Township, and Goodwell Township in Newaygo County

Newaygo County Newaygo County Road Commission Ashland, Newaygo Cty. Garfield, Ashland, Newaygo County Road Bridgeton Township, Commission Newaygo Cty. Newaygo County Road Denver Township, Commission Newaygo Cty.

Newaygo County Road Big Prairie Township, Commission Newaygo Cty. Newaygo County Road Lincoln Township, Commission Newaygo County Northville Township, MI Northville Township

S

Northville Township, MI Northville Township, MI

Schoolcraft Village

Schoolcraft Village

Somerset Township Somerset Township

Somerset Township, Hillsdale County Mi Somerset Township, Hillsdale County Mi

02262009

A T

s

O N

Airport near 1,200,000 Isabella & Pickard

$

$

Norton Avenue, Henry St to 1,775,000 Roosevelt Rd

11/9/2009

$

Grand Haven Rd, Pontaluna Rd to 1,700,000 Wilson Rd

12/10/2009

$

7,000,000

fall

$

400,000

fall

$

800,000

10/9/2009

O R

PP

$

D VE

The Huron Manistee National Forest covers 61 percent of Newaygo County and hosts a high concentration of recreational and seasonal forest activities such as camping, hiking, recreational vehicle trails, horseback riding, etc. In addition to providing recreational opportunities, many seasonal and permanent homes have been built in and around the Manistee National Forest making Wildland-Urban interface difficult. Currently, there are no regulations to prevent residents from building in fire prone areas or requiring defendable spaces around their homes. Many of these residential areas are built around narrow roads and driveways and directly next to the wood line. This project would coordinate with the National Forest Service in developing a Wildfire Urban Interface Plan and working with townships to develop wildfire mitigation ordinances. 3/1/2009 Construct to all weather standards by means of crush/shape to allow area agricultural operations to operate at normal legal load limits year around. 7/9/2009

12/31/2010

$

500,000

9/10/2009

$

between 128th St. 625,000 & Moore Rd.

Construct to all weather standards by means of crush/shape to allow area agricultural operations to operate at normal legal load limits year around. 7/9/2009

9/10/2009

$

Construct to all weather standards by means of crush/shape.

7/9/2009

9/10/2009

$

Rehab road surface with addition of valley gutter to control erosion and to complete route to township park.

7/9/2009

9/10/2009

$

Mundy Ave. 5 Mile Sewer Extension

Construct roadway to newly designated county park. Constructing a sanitary sewer booster station and force main

7/9/2009 6/1/2009

9/10/2009 10/1/2009

$ $

between Elm Ave. 1,200,000 & Beech Ave. between Foss & 5 1,500,000 Mile Rd. 480,000

5 Mile Road Booster Station and Force Main Napier Road / 5 Mile Water Extension Production Well, Well House Bldg. & Water Main

Constructing a sanitary sewer booster station and force main Constructing a sanitary sewer booster station and force main Installing a production well and well house building at the Schoolcraft Township Hall and extending water main to alternative well site.

6/9/2009 6/9/2009

10/9/2009 10/9/2009

$ $

610,000 2,029,600

8/15/2009

11/15/2010

$

1,320,000

Block Grant

Energy efficiency and conservation block grant program to provide Somerset Township with funding to conduct residential and comercial energy audits to all residents and bussinesses. Replace bridge on Bilby Road north of Addison Road. Bituminous 3" paved surface north and south of bridge

10/1/2009

10/1/2010

$

120,000

$

195,000

t s e

Newaygo County Wildfire Urban Interface

e t tt

North River Dr. Dickinson Ave.

i m

16th St.

Replace Bridge

u q e

R d

Alger Ave.

ub

Northville Township Northville Township

8/9/2009

Funding Request

Route (Infrastructure Only)

Pontaluna Rd, Grand Haven Rd to 3,000,000 Henry St

11/9/2009

6/9/2009

Norton Shores

Muskegon City

11/13/2009

6/9/2009

City of Norton Shores

Muskegon County

Expected Completion Date

Submitted Requests - Not Approved

September1,2009 June I, 2010

between Newaygo 750,000 City & Warner Ave. between M-20 & 4 800,000 Mile Rd.

915 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Somerset Township

Somerset Township

Somerset Township

Somerset Township

Somerset Township, Hillsdale County Mi

Somerset Township, Hillsdale County Mi

Somerset Township, Hillsdale County Mi

Somerset Township, Hillsdale County Mi

Canton Township

Canton Township

City of Kalamazoo

City of Kalamazoo

City of Kalamazoo City of North Muskegon

City of North Muskegon

u S

City of North Muskegon City of North Muskegon

City of North Muskegon Village of Caseville Village of Shepherd

City of North Muskegon Village of Caseville Shepherd

02262009

Project Description

Start Date

Handicap and building rehab

Handicap entrance to township owned 42 acre McCourtie park. All grade work to existing specs, 1800 sq. ft. of cocrete drive and drop off area, all concrete to be 4" reinforced on sand bed. Replace all doors and windows with energy efficient items. New electrical wiring, energy efficient lighting, and geothermal heating systems.

Jerome Community Building

Perform energy retrofit of township owned Jerome Community Building. Remove and replace old oil furnace and forced air system with geothermal heating systems. Replace existing windows and doors with energy efficient items. Install 16" of insulation in attic. Remove and replace existing hot water heater with energy efficient September system. Remove and replace 500 square feet of 4" concrete by entrance 1,2009

Emergency Services Building

Convert old township hall into an emergency services building, housing fire, police, ambulance departments in one building. Add 1500 square feet of interior parking space for vehicles. Rehab offices into on duty living areas for fire and ambulance personnel. All heating systems to be geothermal.

Township Hall

Build energy efficient and people friendly 6400 square foot township hall on presently owned township property. Large meeting rooms to accommodate public hearings and meetins.Office space for elected officials and staff. Building will have geothermal heating system, energy efficient lighting systems and windows.All ceiling area will be insulated to R-34. Swipe card entry system for security. All plumbing to be run in basement or crawl space. 11/1/2009

Western Wayne County Transportation Improvement Study 2006-2030

Create a spur off of the I-275 off-ramp that directs exiting traffic to Haggerty Road. The recent Western Wayne County Transportation Improvement Study which was a regional study rates this improvement as a high priority project that will help improve traffic flow in the I-275/Ford Road/Haggerty Road area. The Haggerty/Ford intersection currently operates at a Level of Service F. Ford Road is under the jurisdiction of the Michigan Department of Transportation and Haggerty Road is a Wayne County Primary Road which makes them eligible for Federal Aid Funding.

T O

s t s

11/1/2009

-N

Funding Request

D VE $

197,000

September 1,2011 $

203,000

O R

P P A

e u

eq

10/1/2010

November 1,2009 11/1/2011

Water Resource new and Replacement Wells - Replace low producing wells

11/1/2011

$

327,000

$

1,380,000

$

500,000

Route (Infrastructure Only)

6/1/2010

$

445,000

New Water Pumping Station/Wellfield in Northern Oshtemo Township - Construction of a water pumping and treatment facility and all of the associated components, including the installation, development, testing, and pumps and motors for five production wells, and approximately 1 mile of water main, and station booster pumps and motors. 8/1/2009

8/1/2011

$

4,000,000

Enhance safety, parking and traffic flow

10/5/2009

Allowable weather conditions $

Bear Lake Bridge seawall

Repair deteriorating seawall

10/5/2009

Allowable weather conditions $

Witham Drive Reconstruction

Reconstruct roadway with poor sub surface

9/8/2009

11/6/2009

$

200,000 Ruddiman Drive Witham Drive540,000 Major Street

Construct new Public Works Building

Replace existing 1930/40 building with new structure

9/1/2009

11/20/2009

$

750,000 On city property

R d

e t t

City of Kalamazoo

City of North Muskegon

City of North Muskegon City of North Muskegon City of North Muskegon

Project Name

Expected Completion Date

it

Downtown Streetscape Project

bm

Ruddiman Drive Reconstruction State Street curb/watermain Street

Reconstruction roadway through some business district areas Curb & gutter State St./ install new water main Reconstruct Wright Avenue from railroad tracks to west village limit

Submitted Requests - Not Approved

10/5/2009 June 1 2010

Allowable weather conditions $ $ August 1 2010 $

On Center Ruddiman 144,000 Intersection

On Ruddiman between Center 1,670,000 and Whitehall Road 426,800 400,000

916 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Project Name

Project Description

Start Date

Expected Completion Date

Wayne County initiative to establish wireless internet access for disadvantaged areas and economic development zones to ensure opportunity and information access to all citizens within Wayne County. Cost: $2,300,000 9/1/2009

Wireless Wayne

$

2,300,000

9/1/2009

$

4,500,000

9/1/2009

$

400,000

10/1/2009

$

6,000

City of Westland: 31461 Alcona 33020 Almo 33516 Berville 2099 Dryden 2128 Elbridge 28130 Eton 32570 Mackinac 35890 Strategic Nuisance Abatement Program Manila (SNAP) Muskegon City Terrace St. Reconstruction Muskegon City Sherman Ave. Reconstruction

The Strategic Nuisance Abatement Project is designed to remove blight and return property to productive use. This project will focus on the demolition and deconstruction of vacant and blighted properties as well as the creation of urban gardens and additional green space. The project will also work in conjunction with the local municipalities of Hamtramck and Westland. The Development Director and Code Enforcement officals of both cities are putting their staff resources to work in order to realize maximum development and job creation. The demolition activity will create both skilled and unskilled jobs. The deconstruction activities create environmentally friendly (green) jobs as materials are recycled. The workers also learn aspects of construction including safety. The Urban Gardening aspect of the project will provide food and jobs for the community, Food Co-ops will be formed in conjunction with the activities of neighborhood groups and other non-profits. Nutrition will also be a critical component of this project. 6/1/2009 Reconstruction of Terrace St. from Apple Ave. to Western Ave. 5/9/2009 Reconstruction of Sherman Ave. , Lincoln to Henry 5/9/2009

11/1/2009 12/1/2009 12/1/2009

$ $ $

6,000 750,000 2,000,000

Escanaba

Water Intake Pipe Upgrade

The existing 100+ year old water intake pipe is undersized in that the Plant has an 8 million gallon per day capacity, but can only get 6 million gallons per day through the existing intake pipe. The capacity of the existing pipe will limit the amount of potable water needed for business retention, expansion and growth. (Priority: 2 - Necessary) 7/11/2009

10/12/2009

$

5,000,000

Whitetail Industrial Park Water Loop

The water supply line is currently a dead end supply line with capacity being dictated by the absence of a water loop. This in turn limits industrial uses in the park. (Priority 2 - Necessary) 7/11/2009

12/11/2009

$

2,000,000

Wayne County is establishing a Technical Resource Center which will at the core, provide low cost Data Center services to regional municipalities and local private businesses. It is our intent to equipment the Technical Resource Center with not only best-in-class Data Center facilities and high speed fiber network infrastructure, but also expand to provide for the increased demand for managed services, application development, disaster recovery planning, at pricing levels which would stimulate job Regional Technical Resource Center Network development and attract future business development to the region. Cost: Infrastructure $4,500,000 3/1/2009 Reconstruction of Muskegon Ave - Sixth St. to Reconstruction of Muskegon Ave. from Sixth St. to Pine St. including green spaces, Pine St. sustainable drainage 2009

Wayne County

Wayne County

City of Muskegon

Muskegon City

Wayne County

City of Hamtramck: 2415 Alice 2236 Andrus 2666 Commor 2235 Danforth 2379 Danforth 2416 Danforth 2327 Faber 2429 Faber 11327 Fleming 9509 Gallagher 2997 Goodson 3110 Goodson 11551 Lumpkin 12009 Lumpkin 12159 Lumpkin 11416 Saint Aubin 2340 Strategic Nuisance Abatement Program Zinow (SNAP)

A T

t s e

O R

PP

The Strategic Nuisance Abatement Project is designed to remove blight and return property to productive use. This project will focus on the demolition and deconstruction of vacant and blighted properties as well as the creation of urban gardens and additional green space. The project will also work in conjunction with the local municipalities of Hamtramck and Westland. The Development Director and Code Enforcement officals of both cities are putting their staff resources to work in order to realize maximum development and job creation. The demolition activity will create both skilled and unskilled jobs. The deconstruction activities create environmentally friendly (green) jobs as materials are recycled. The workers also learn aspects of construction including safety. The Urban Gardening aspect of the project will provide food and jobs for the community, Food Co-ops will be formed in conjunction with the activities of neighborhood groups and other non-profits. Nutrition will also be a critical component of this project. 5/1/2009

s

3/1/2010

Funding Request

Route (Infrastructure Only)

D VE

O N

u q e

R d

Wayne County City of Muskegon City of Muskegon

City of Escanaba

City of Escanaba

e t tt

i m

Escanaba

02262009

b u S

Submitted Requests - Not Approved

917 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Escanaba

City of Muskegon

Escanaba

Muskegon

Project Name

Project Description

Start Date

Expected Completion Date

Waste Water Plant Upgrade

The existing plant was built in 1992 and is rated at 2.2 million gallons per day. The existing flow at certain times of the year approach and often exceed the design capacity. Additionally, flow will exceed design capacity more frequently when the ground water levels rise. (Priority: 3 - Desired)

Farmer's Market Relocation

Relocate the Farmer's Market to the parking to lot on Morris St. in the developing new downtown area. Plans call for a new structure that would accomidate some year round vending areas and space for a restaurant. 7/9/2009

7/11/2009

10/12/2009

9/1/2009

O R

T O

N s

st

39934

Jackson Road Drain

Pere Marquette Charter Township and the City of Ludington, Mason County, Michigan8/1/2009

City of Ferrysburg Lake Township Lake Township

Ferrysburg City Lake Township Lake Township

West Spring Lake Project playground new fire house

Reconstruct, resurface, curb and gutter, storm drain improvements, streetscape new playground new fire station

Downtown Baldwin Village

City of New Baltimore City of New Baltimore Deckerville Community Hospital Deckerville Lake Township Lake Township

02262009

6,000,000

$

2,000,000

D VE

$ $ $

2010 2010

$ $

650,000 1,100,000

Construct approximately 7,200 square feet addition to the existing Department of Public Service building. The addition will expand the office and shop areas and provid improvement for storage of vehicles and equipment. The site improvements will include paved public parking, entrances, storm drainage, and a monument sign. The Department of Public Service Building Addition existing building is undersized and incapable of providing adequate storage, work, and & Site Improvements office area. 5/1/2009

11/1/2009

$

1,125,000 Cricklewood Blvd

MacDonald Public Library Building & Site Improvements

UNDER CONSTRUCTION Construct approximately 2,327 square feet addition and renovate approximately 2,308 square feet for the existing MacDonald Public Library building. The front of the existing building has significant structural deficiencies in need of replacement. The improvements will resolve this issue as well as expanding and providing more efficient use of the floor space. The addition and renovation will provide expanded areas for children, circulation, reference material, and computers with internet access capabilities. 1/1/2009

11/1/2009

$

1,000,000 Main Street

Repair Parking fire tanker

Parking Lot/Landscaping - Renovation new fire truck tanker

7/1/2009 2010

$ $

Tourism/Museum/Extension Bldg Alley rebuild

d e tt

t i m

e u

q e R

6/1/2009 2009 2010

$

Reconstruction of the Jackson Road Drain system. This aging storm sewer causes major flooding in and near major business facilities. It is the desire of the County to secure funding to make complete and permanent improvements to this drainage facility 300,000 i Smith's Bridge to 500,000 Bayberry 65,000 500,000

10/30/2009 2009 2010

b u S

City of New Baltimore City of New Baltimore

$

P P A

Mason County

LCEDC Village of Baldwin

Funding Request

Route (Infrastructure Only)

Lake County currently houses the Chamber of Commerce, MSU Extension and Historical Society in an old Texaco Station. A new facility would better introduce our tourists to our local attractions, pull people in via the Museum and Extension, and improve the apprearance of the village (Image Building is one of our CEDS goals for 2009). Operational expenses should be about the same as at present. 2009 bury utilities, obtain easements, repave alley 2009

Submitted Requests - Not Approved

6/1/2009 2009

75,000 200,000

918 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Lake Township Lake Township

Wayne County Village of Fowler

Project Name mini pumper brush truck

Romulus, Taylor, Belleville, Van Buren Twp, Huron Twp, Ypsilanti, Detroit Region Aerotropolis Mobility & Ypsilanti Twp Connectivity Study Fowler WWTL Cleaning

Project Description

Start Date 2009

Expected Completion Date Funding Request 2010 $ 250,000

mini pumper/brush

A study commissioned by the Aerotropolis partners highlighted the potential to create up to 64,000 jobs over the next 20-30 years upon build-out of 5,000 acres around the Detroit Metro and Willow Run airports. This job potential is behind the need to work as region to plan and develop infrastructure that meets the needs of residents, workers, and visitors to the region. The Aerotropolis partners recognize the importance of creating an environment that: • Integrates mass transit and transitoriented development • Provides a direct transit connection between our airport and our existing downtown areas • Maximizes property use to create density • Incorporates green design to maximize energy efficiency • Addresses common infrastructure needs of our businesses and residents • Maintains I-94 as a viable and efficient corridor for trade • Enhances connectivity between the airport environs and our other major transportation assets. The purpose behind the Detroit Region Aerotropolis Mobility and Connectivity Study is: • To identify primary corridors for infrastructure development and to identify environmental and fiscal issues associated May, 2009 Wastewater Treatment Lagoons sludge cleaning 9/1/2009

P P A

O R

Route (Infrastructure Only)

D VE

September, 2010 10/31/2009

$ $

3,000,000 510,000

City of New Baltimore City of New Baltimore

City Hall Municipal Building & Site Improvements

Construct a new City Hall Municipal building for City Offices and Departments including Fire and Police. The new building will be approximately 27,230 square feet compared to the existing building which is 9,136 square feet. The existing building does not contain the Police Department. The site improvements will include additional paved parking, offsite street parking, storm drainage, and landscaping. The improvements will allow the City to consolidate the public service departments, including Fire and Police, into one building. The existing City Hall and Police Department buildings are undersized and incapable of providing adequate storage, meeting, and office areas and parking. 4/1/2010

10/1/2010

$

5,450,000 Green Street

City of New Baltimore City of New Baltimore

Construct a new 2-story building with basement at approximately 30,000 square feet per floor for the Recreation Department. The existing building is 1-story and approximately 4,000 square feet. The site improvements will include paved parking, storm drainage, and landscaping. The existing building is undersized and incapable of providing adequate storage, meeting, and office area. The proposed building will not only address this issue but provide running and jogging tracks, exercise equipment, City Recreation Building & Site Improvements bathroom/locker room, meeting/banquet area, storage, and office areas. 4/1/2010

10/1/2010

$

Maintenance Garage & Boat House Street Sign Compliance WWTL Expansion

Construct new building of approximately 2,950 square feet containing a maintenance garage, for use by the Water Plant, and boat house, for use by the Fire Department. The improvements will also include a paved parking lot, storm drainage, and security fencing. The existing boat house was demolished and the existing canal dredged in preparation for the new building. The Maintenance Garage will provide much needed storage for Water Plant vehicles and equipment. The Boat House will provide storage for the Fire Department, two boat hoists, and direct access to Lake St. Clair. Recent substantial improvements to the City Waterfront, including an expanded beach, have increased the need to closely monitor all water activities for the health and safety of al persons. 4/1/2010 Replace street signs to bring up to code 8/1/2009 Construct 3rd wastewater treatment lagoon cel 5/25/2011

10/1/2010 10/1/2009 10/1/2011

$ $ $

490,000 Front Street 7,500 1,550,000

Pump Station D

This aging lift station needs replacement with smaller pumps and the paper mill piping will need to be changed so that the mill can pump directly to C Station, saving much energy and providing more reliability at D Station. 2010

2010

$

4,000,000

d e tt

t i m

b u S

City of New Baltimore City of New Baltimore Fowler Village of Fowler Village of Fowler Fowler

Muskegon County

Muskegon City

02262009

T O

st

e u

q e R

N s

Submitted Requests - Not Approved

720,000 Washington Street

919 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Barton Township

Wayne County Newaygo County

Wayne County

E.17 mile Barton Twp.

Wayne County Newaygo County, White Cloud, MI

Wayne County (Outside the City of Detroit)

Project Name

Project Description

Expected Completion Date

Start Date

New Town hall

Barton Twp. Owns 27 acres that has a small park and building with pit style toilets. This building was rented out 45 times in 08' the building is small and substandard for this use. The Township hall is the 100 plus year old converted school house that is non-compliant for handicap use. This building is tearably outdated and in need of major repairs and renovations, roof, furnace,Etc.. A new Township hall at the park property would eliminate the need for two seperate locations and would serve as a rental hall as well as Township hall and offices. All Township officials are currently When funding is keeping office space in their homes due to substandard building space. available

?

Health Care Systems Information Security

Project to enhance and protect existing and future Health Care information systems in use within Wayne County and to ensure secure and confidential electronic information exchange both internal to Wayne County government and between provider organizations. Cost: $2,800,000 1/1/2010

GIS system upgrade

Updating the current GIS system, data and user skill sets

Electronic School-based Reporting for Communicable Diseases

The Program allows for collecting and reporting timely and accurate weekly communicable disease information from schools to local health departments, using electronic/online reporting and tracking system. The system would also track immunization waivers in schools. This program will allow Wayne County Local Health Department to monitor and prevent outbreaks in the community. This program provides the necessary infrastructure for an appropriate response in the event of Pandemic Flu or other Communicable Diseases. Upon funding

O R

Funding Request

D VE

Route (Infrastructure Only)

$

280,000

6/1/2010

$

2,800,000

3/31/2009

$

16,600

Two years from start date

$

10,000 N/A

The Wayne County Jail (WCJ) Rapid HIV Screening Program offers HIV screening services to all inmates upon entry into the Wayne County Jail. Approximately 1% of inmates tested were newly diagnosed in the facility. The estimated prevalence in the facility approaches 2% based on the number of inmates who enter the facility with HIV medication on their person or who self-disclose their status to a healthcare provicer. The Wayne County Jail Health Services Department ensures that all HIV positive inmates, both newly diagnosed and existing cases, have access to healthcare, treatment and case management services to support their continuity of care. Inmates are offered on-site access to comprehensive healthcare services, but treatment is initiated at an off-site contracted Infectious Disease Clinic. The Wayne County Jail physicians maintain the treatment orders and monitor the patient for treatment adherence and compliance. However, all medication costs become the responsibility of the Wayne County Jail Health Services Department. With the increased cost of prophylaxis, we anticipate that the costs could negatively impace the Wayne County HUpon funding

Two years from start date

$

200,000 N/A

CHA is the basis for all local public health planning. The program aims to describe the health of the community by presenting information on health status, including epidemiologic, and other studies of current local heath problems, community health needs, health care and community resources. The program will identify target populations that may be at increased risk of poor health outcomes and will gain a better understanding of their needs. This community health assessment is a continuous, interactive local process

Two years from start date

$

230,000 N/A

s

t s e

A T

PP

immediate

O N

u q e

Wayne County

Wayne County

R d

e t t

t i m

Wayne County, Michigan Wayne County Jail HIV Treatment Program

b u S

Out-Wayne County

02262009

Community Health Assessment (CHA)

Submitted Requests - Not Approved

Upon funding

920 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Project Name

Project Description

Start Date

Expected Completion Date

Wayne County Jail STD Prevention and Wayne County, Michigan Education Program

This proposed program will offer Gonorrhea, Chlamydia and Syphilis screening to atrisk inmates in the Wayne Coutny Jail. Prevalence estimates indicates that inmates are at greater risk of infectious diseaases, sometimes approaching 58 times higher than that of the general population. Current risk data indicate that youth in the general population, under the age of 24, are at greatest risk for contracting Gonorrhea and Chlamydia. With current funding we are only able to screen a small subset of females for Conorrhea and Chlamydia and only females for Syphilis. However, current screening efforts have identified 12% incidence of Chlamydia and a 3% incidence of Gonorrhea. This program will allow us to reach a higher percentage of at-rise males and females, older females and males with recent exposures or multiple sex partners and pregnant females. Progrma funds will support program staff and testing devices, laboratory fees, equipment and supplies. A comprehensive education program will be provided through video programming, pre-test knowledge-based screening questionnaires and peer-training. Males under the age 0f 24 will be offered screening Upon funding

Wayne County Jail Rapid HIV Screening Wayne County, Michigan Program

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

Two years from start date

$

385,000 N/A

This program is a novel opt-out HIV Screening Program for inmates upon entry into the WCJ. This program utilizes rapid screening technology and coordinated interdepartmental, inter-agency procedures for reporting, treating, and follow-up care. Onsite health care providers offer all inmates upon entry, a rapid HIV screening exam, on an opt-out basis, as a component of the initial health appraisal. The provider provides results and post-test counseling during that initial point of contact. Reporting of tests, test results, case management, and treatment services occur through a collaborative effort between the jail, local health departments, state health department and community service agencies. The current program is operated by four staff members, one program manager and three certified HIV counselors. The three counselors are able to offer screening services on both day (2) and afternoon (2) shifts. Current testing data indicates that we are able to test approximately 1% and all newly identified cases were linked to care. With additional funding, we would be able to fully staff the department to a capacity that could offer HIV screening at multiple locations aUpon funding

Two years from start date

$

475,000 NA

Wayne County, Michigan (excluding Detroit) Specialized Computer Training for the Blind

This project will allow the Wayne County Regionald Library for the Blind and Physically Handicapped to provide computer training, email, internet and assitive technology, to residents. Through effective ongoing training sessions, residents will have the capacity to interact with family and friends located across the breath of the country while also providing a clear quality of life enhancement. Computer access and use has long been a desired area of training the library has wanted to provide expanded training. With the purchase of additional computer terminals and more staff to provide one-on-one training, we are certain we could provide the necessary tools so that residents would have complete independent access and usage. Given the economics of purchase of equipment and sustainability of tcehnology connection, we anticipate increased request for training. Staff, updated assisitve technology devices, computers, and additional equiopment are the necessary tools to enact this program Upon funding

Two years from start date

$

500,000 N/A

Wayne County, Michigan Descriptive Video Collection and Enhanced (excluding Detroit) Audio Collection

One of the more increasingly popular program demands by patrons is that of the availability of descriptive videos. These are the videos of the more popular movie titles, most of which have been adapted for the visionally impaired via descriptive video. These titles actually describe the scenes that are occurring in the movies. Popular with this special population, they are very often outside the budget of most libraries for the blind. In an effort to provide the same level of services that are available to other library patrons, access to the development of this collection would place the blind at par with our public library patrons. Collection Development staff would identify sources for purchase and catalog these materials.

Two years from start date

$

500,000 N/A

A T

s

t s e

O N

u q e

R d

Wayne County

Wayne County

e t tt

i m

b u S

02262009

Submitted Requests - Not Approved

Upon funding

921 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Wayne County

Wayne County

Wayne County

Wayne County (Outside the City of Detroit)

Detroit, Michigan

Taylor, Michigan

Project Name

Project Description

Start Date

Expected Completion Date

Comprehensive Healthy Homes Program

The program supplements the existing lead grant program by providing incentives to address causes and/or contributors to respiratory conditions such as asthma, mesothlia, and cancer. Upon funding

Two years from start date

Medical Technology Communication

Establish computer capability for federally-qualified and other community health clinics to securely develop, log and share client information for individuals with mental illness for referral and services from the CMH system. This will improve the safety net and increase collaboration and coordination of care. Upon funding

Two years from start date

Homeless Services for Adults with Mental Illness

Establish an infrastructure of mental health care and support for suburban areas of Wayne County where residents experiencing homelessness and mental distress and/or increased substance use are utilizing homeless shelters in increased numbers. While the Agency supports a 24-hour center in Detroit, a suburban program is needed to the lack of public transportation in suburban areas and the growth of homelessness for residents in the midst of economic trauma. The support will allow mental health assessments and connections to mental health services, such as crisis intervention, suicide prevention, substance abuse treatment, and any ongoing service needs based on diagnosis. Upon funding

Evidence Based and e-Prescribing Wayne County, Michigan Communication Technology

Wayne County, Michigan Vocational Rehabilitation Grant for Mental (including Detroit) Health Director Care and Other Workers

itt

d e t

Mental Health Assessments of Returning Veterans

Funding Request

$

Route (Infrastructure Only)

500,000 N/A

D VE $

1,000,000 N/A

Two years from start date

$

1,250,000

Two years from start date

$

1,300,000 N/A

Expand county-wide existing training programs to provide enhanced career path for direct care and other mental health workers to have skills and knowledge necessary to retain employment in mental health and to experience upward mobility to other jobs in mental and other health care fields. The program will also provide displaced workers in Wayne County with the ability to pursue a new career path in the health care sector that is experiencing job growth. Upon funding

Two years from start date

$

1,500,000 N/A

Allow the CMH agency as the first provider of mental health assessments for returning veterans to more effectively reduce the backlog of veterans needing mental health services, improve veteran's and their families utilization of services to help prevent or address depression, family violence, substance abuse, and/or homelessness. Upon funding

Two years from start date

$

2,000,000 N/A

T O

P P A

Expand implementation of the InfoScriber e-prescribing initiative across the entire Community Mental Health service delivery system including inpatient, residential to outpatient settings, wherever medications are prescribed. This will include enrolling an estimated 300 prescribers in 90 organizations in a web-based software application and supplying hardware and software as may be needed to enable full participation fo prescriptions provided to the more than 58,000 children, adolescents, adults and older adults served by the Agency each year. This project also implements evidence based prescribing for persons with schizophrenia, bipolar disorder and major depressive disorder. Upon funding

q e R

N s

st

e u

O R

Wayne County

Detroit, Michigan

Wayne County

Wayne County, Michigan (including Detroit) Centers for Independent Living

Improve options for mental health clients that are able to live independently but currently lack supply of appropriate and affordable centers that support independent living for those with disabilities, including the population with disabilities as they age. Upon funding

Two years from start date

$

2,500,000 N/A

Wayne County

Wayne County, Michigan (including Detroit) Infant Mental Health Education

Implement coordinated system of comprehensive program for infant mental health, which serves infants from birth to three years old and their families.

Two years from start date

$

4,000,000 N/A

02262009

u S

bm

Submitted Requests - Not Approved

Upon funding

922 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Wayne County

Wayne County

Wayne County

Project Name

Start Date

Wayne County, Michigan Enhanced BasiCare Program

The BasiCare Program is a Wayne County health program for Wayne County residents, 18-64 years of age. This program provides limited medical benefits on an outpatient basis. Members services include: laboratory, x-rays, medical supplies, pharmacy services, urgent and medical care. The purpose of BasiCare Diabetes Program is to provide services to Wayne County residents. Education, prevention and maintenance. 450,000 low income participants will be served by this program. Upon funding

Wayne County, Michigan Wayne Babies…Live, Learn & Play

The effort is designed to increase parental and caregiver awareness of the important connection between their child's early learning and his or her future success. To that end, it provides parents, family memebrs and caregivers with engaging information, materials and learning activities to help children from birth age to five, develop language and liateracy skills needed to enter school ready to succeed/ Wayne County expectant mothers and parents/caregivers with children up to age five can receive a keepsake record book with which they can document their child's birth and medical informaiton. In addition, they will be given a comprehensive referral/resource directory containing key information from A-Z, on both basic childcare and Wayne County services including education, counselling, mental access, emergency assistance and health services period. Upon funding

Out-Wayne County

Adult Vaccination Program

The Program targets vaccine preventable diseases such as Pertussis and Measles that were commonly thought to be a thing of the past. Unfortunately as a result of waning immunity, these dieases are increasing throughout the United States. We seek to establish an adult immunization program that would immunize at risk adults against all avaiable vaccine preventable dieases. Examples of vaccines that are avaiable including Varicella (Chicken Poxs/Shingles) and Hepatitis A and B.

Out-Wayne County

Coordinated Response of Public Health Schools and Long-term Care Facilities for Pandemic Flu.

Wayne County (Outside the City of Detroit)

This program will offer urine-based screening for Chylamdia, Gonnorrhea and rapid HIV testing for high-risk population in non-traditional settings including youth Expedited Testing and field screening got GC assistance programs, substance abuse treatment centers, rehabilitation centers, & Chlamydia housing commissions, and communinty-based organizations.

t i m

Wayne County, Michigan Adult Benefit Waiver Program

02262009

Funding Request

Route (Infrastructure Only)

D VE

Two years from start date

$

4,600,000 N/A

Two years from start date

$

1,500,000,000 N/A

Upon funding

Two years from start date

$

130,000 N/A

Hold Pandemic Flu Summits for schools and long-term care facilities in order to assist school administrators and other facility in preparing and operativonilizing their schoolbased and long-term care facilitie plans. These summits will also familiarize key players with one another day to day roles as well as lay the foundation for unified command if needed. Upon funding

Two years from start date

$

15,000 N/A

Upon funding

Two years from start date

$

150,000 N/A

IIn 2003, the Centers for Medicare and Medicaid Services (CMS) granted the State of Michigan, Department of Community Health, a waiver of certain requirements under Title XXI of the Social Security Act. Because of CMS’s approval of Michigan’s demonstration waiver (1115) called the Adult Benefit Waiver (ABW) Program, Wayne County Patient Care Management System (PCMS) is one of the first County Health Plans in the State to be awarded a Grant Agreement with the State of Michigan to provide the access to health care coverage for thousands of ABW members. This Grant Agreement is part of the 1115 Waiver that allowed use of SCHIP monies to provide health care coverage to 24,000 Adult Benefit Waiver members in Wayne County who are under 35% of the federal poverty level (FPL) and are approved for ABW through the State Department of Human Services. The SCHIP waiver has been extended through the end of March 2009. Because of the current down turned economy and the estimated 300,000 to 400,000 uninsured residents in Wayne County, PCMS is requesting that 12,000-24,000 additional residents are assigned to t Upon funding

Two years from start date

$

38,000,000 N/A

T O

st

e u

eq

Submitted Requests - Not Approved

O R

P P A

N s

R d

e t t

b u S Wayne County

Project Description

Expected Completion Date

923 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County (Outside the City of Detroit)

Project Name

Project Description

Prevention with High-Risk HIV negative and HIV positive persons.

Start Date

This program targets High-Risk negative and HIV positive persons for secondary prevention programming, including CDC approved prevention programs such as SISTA and Mpowerment.

Wayne County (Outside of the City of Detroit) Diabetes Screening and Prevention

Wayne County (Outside of the City of Detroit) Wayne County Babies

The Wayne County Babies Program is a multi-tiered approach to reaching populations at highest risk for pre-term births, low-weight babies, and ultimately, infant mortality. Wayne County Babies consist of a home visiting porgram that is designed to increase access to needed maternal and child health services to the medically underserved, low-income and young children (birth to age two). It also provides educational classes on safe sleep and participants are given Pack N Play portable cribs at no cost. It also supports the client in pursuing idenified life goals including education and job readiness. Upon funding

Wayne County

Wayne County, Michigan (excluding Detroit) Head Start/Early Start

Wayne Count Head Start proposes to: (1) Expand full day services by adding 10 classrooms to serve 170 additional children. (2) To implement Early Head Start Program by servicing 240 children.

LCEDC

Village of Baldwin/Pl.Plains and Webber Twps.

Purchase used front end loader for snow removal around all county buildings

Wayne County

Mason County

T O

Snow Removal Equipment

Mason County Terminal Apron Expansion Project

39934

s t s

O R

-N

Mason County, Michigan

Funding Request

$

e t tt

i m

$

500,000 N/A

Two years from start date

$

600,000 N/A

Upon funding

Two years from start date

$

4,000,000 N/A

2009

2009

$

10/1/2009

$

Project to construct a 9,000 S. Yd. Expansion to the Terminal Apron at the Mason County 240,000 Airport.

$

Project to construct a taxiway to Service Runway 826 at the Mason County Airport including land 1,313,000 acquisition.

39934

City of Rochester Hills

City of Rochester Hills

Michigan Rebuild

Retrofit 10 municipal buildings to LEED gold certification standards and to follow the energy evaluation and recommendations of the Michigan Rebuild program.

$

1,000,000

Citywide

City of Rochester Hills

City of Rochester Hills

Vehicle Transistion

Purchase hybrids for city vehicles.

$

500,000

Citywide

S

10/1/2009

50,000

Mason County

ub

Mason County, Michigan

250,000 N/A

D VE

R d

Mason County Airport Taxiway Construction Project

Route (Infrastructure Only)

Two years from start date

P P A

e u

eq

Two years from start date

Upon funding

Developing an ongoing public awareness campaign, which includes messages that target at risk populations. The program also offers diabetes awareness messages, which address racial and ethnic disparities and social determinants. The program also provides quality diabetes pregnancy-related education to women of childbearing years. Develop and conduct workshops focusing on practical ways to increase physical activity and developing health eating habits. Upon funding

Wayne County

Expected Completion Date

Hillsdale Community Health Center

168 South Howell Street, Hillsdale Community Health Center Hillsdale, MI 49242 Contruction and renovation project

The Contruction and Renovation Project has 4 distinct parts: 1) construction of a new 19-bed skilled nursing home floor, 2) construction of a replacement 10-bed obstetrical floor, 3) renovation of exist 21-bed skilled nursing home floor from semi-private to private rooms, and 4) modernization of the hospital heating, ventilation, and air conditioning systems. May 1, 2009

City of Rochester Hills

City of Rochester Hills

Enclosure of Van Maele drain to provide for business development as well as reduce the hazard of the open ditch next to a roadway 6/9/2009

02262009

Van Maele Drain enclosure

Submitted Requests - Not Approved

August 1, 2010

$

12/9/2009

$

14,900,000 N/A Select properties 3,000,000 along South Blvd.

924 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Construction of a water storage facility to provide adequate water pressure to the north and east-central areas of the City of Rochester Hills, as well as to potentially reduce the water purchase rates from DWSD by as much as 40 percent. The reservoirs would promote the reduction of electrical energy due to the pumping of water at fixed rates rather than variable rates which drives up electrical consumption. Over the lifecycle of these water system componants substantial reductions in electrical consumption can be expected as well as reduced water rates to the 70,000 residents of the City. Install road, sanitary sewer, storm sewer and watermain for a research park in the Jackson County Smart Zone. Install sanitary sewer system. Install water main. Replace pumps on a existing sewage lift station Install water main. Install sanitary sewer system. Install water main. Install water main. Install road, sanitary sewer, storm sewer and watermain for a industrial park in the Jackson County Smart Zone. Purchase standby portable sewage pump Install sanitary sewer system. Install sanitary sewer system.

City of Rochester Hills

City of Rochester Hills

Water Storage Facility

Blackman Township Blackman Township Blackman Township Blackman Township Blackman Township Blackman Township Blackman Township Blackman Township

Blackman Twp Blackman Twp Blackman Twp Blackman Twp Blackman Twp Sandstone Twp Blackman Twp Blackman Twp

Springport Road Research Park Hunters Ridge Sanitary Sewer Northwest Area Water Main Parnall Road Lift Station Parnall Road Water main Faith Haven Sanitary Sewer Lansing Avenue Water Main Hurst Park Water Main

Blackman Township Blackman Township Blackman Township Blackman Township

Blackman Twp Blackman Twp Blackman Twp Blackman Twp

Jackson Technology Park Standby Sewage Pump Morrill Acres Sanitary Sewer Paradise Valley Sanitary Sewer

City Connect Detroit

City Connect Detroit will organize and expand workforce development training for lowincome young adults, ages 18 to 24, in Wayne County to prepare them for jobs in priority areas identified in the American Recovery and Reinvestment Tax Act of 2009 (health care, renewable energy industries, green building). These activities will be conducted with an established partnership of community organizations devoted to helping young adults access multiple pathways to education and job training. These organizations provide services and supports for young adults and will help screen and refer them for training opportunities. Many of these youth have battled against an increasing high school drop-out rate, poor access to education and training resources, and a lack of skills needed to get quality jobs in Michigan’s tough economy. Local educational organizations, businesses, and nonprofits offering workforce development training and education resources in health care and high growth and emerging industr Within 90-120 days of award Multiple Pathways to Workforce Development sectors will recruit, train, and assist 500 young adults in identifying job placement opportunities. Training and internships would be contracted through agencies like Nexreceipt Detroit, MI /Wayne County Training for Young Adults

T O

N s

7/1/2009 7/1/2009 7/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009 5/1/2009

P P A 3/1/2009 4/1/2009 5/1/2009 5/1/2009

u q e

t i m

R d

b u S City Connect Detroit

Detroit and Southeast Michigan

02262009

Workforce for Detroit’s Recovery & New Economy

Coordinated by City Connect Detroit, the Jobs Task Force is creating jobs and entrepreneurship opportunities for historically marginalized and vulnerable populations including minorities, urban youth, chronically unemployed, and ex-offenders. The Task Force is equipped to help Detroit residents and entrepreneurs find job placement on stimulus-funded projects and develop careers in high growth sectors including energy efficiency (green power and transit technicians), renewable energy (batteries, wind, solar, biofuel factory workers and installers), green building (weatherizing carpenters, LEED certified professionals), and healthcare (nurses and medical technicians). With a track record of helping vulnerable populations understand emerging job opportunities, and get trained and ready for employment, the Jobs Task Force will provide 300 residents with access to job training programs at places such as Detroit Workforce Development Department, Wayne State University, Wayne Within 90-120 County Community College, Lawrence Technological University, Marygrove College, days of award Wings of Faith (NGO), and the State’s new Green Energy Corps and No Worker Left Breceipt

Submitted Requests - Not Approved

O R

6/10/2009

t s e

e t t

Expected Completion Date

6/11/2009

Funding Request

D VE $

10,000,000

$ $ $ $ $ $ $ $

495,000 710,000 2,700,000 50,000 120,000 450,000 480,000 840,000

$ $ $ $

920,000 50,000 500,000 430,000

While the funding requested is for a two-year period, the project will be sustained beyond with additional funding from other sources. $

3,850,000

While the funding requested is for a two-year period, the project will be sustained beyond with additional funding from other sources. $

3,500,000

11/1/2009 11/1/2009 9/1/2010 7/1/2009 9/1/2009 11/1/2009 11/1/2009 11/1/2009 8/1/2009 6/1/2009 11/1/2009 11/1/2009

Route (Infrastructure Only)

NA

925 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City Connect Detroit

Detroit, Hamtramck, and Housing for Homeless Individuals and Highland Park (Michigan) Families

LCEDC Blackman Township Blackman Township

Webber Twp. Blackman Twp Blackman Twp

Project Description

This innovative project to increase permanent supportive housing (PSH) in Detroit/Wayne County for the most vulnerable of populations—the homeless—is ready to quickly move forward with gap funding. The project was developed in 2008 by the Detroit Collaborative to End Homelessness Together, a partnership of public, private and nonprofit leaders, to respond to the need for PSH identified by HUD and the 10Year Plan to End Homelessness in Detroit, Highland Park and Hamtramck. All new PSH units created will be to house homeless individuals and families in permanent supportive housing. Key components are: 1. 200 new housing units for the homeless will be created through the renovation of existing or creation of new units. Through a recent Request For Proposal process, projects from local builders and contractors have already been assessed. From this pool and others still under assessment, the strongest "ready to go" projects will be provided gap funding to Within 90-120 create these new units over two years. 2. 300 existing vacant units will be turned days of award into viable permanent supportive housing for the homeless. A start-up plan is in place. receipt Construction of a 60 x 140 sg ft pole building to be used by the community for training exercises, conference facilities and 4H fair ground activities 2009 Install sanitary sewer system. 6/1/2009 Install elevated water tower. 7/1/2009

A T

Training/Conference Center Deerfield Sanitary Sewer West End Water Tower

s

Brooks Township

Global Traffic Technologies

Brooks and Garfield Township Newaygo County, Michigan

Centerline Road Rework

d e tt

it

t s e

qu

O R

PP

O N

Removal of existing road surface, reshape and resurface while bringing the roadwayup to current MDOT standards.

e R

Warren Fire Department Emergency Traffic Priority System

Warren, MI

Start Date

Expected Completion Date

July, 2009

Funding Request

D VE

Within two years of start date $

4,900,000

2010 11/1/2009 7/1/2010

850,000 360,000 1,600,000

September, 2009

Fifty (50) intersections and twenty- five (25) emergency vehicles designated by the Warren Fire Department will be equipped with GPS traffic signal priority equipment that will help emergency responders get to their destinations by changing a red light to green or sustaining a green light for the emergency vehicle to proceed quickly and safely through the intersection. Improves safety by eliminating right-of-way conflicts at the intersection. Studies show signal priority systems improve response times by an average of 20%.

Route (Infrastructure Only)

$ $ $

$

From the north edge of the City of Newaygo that portion of Centerline Road north for approx. 2 miles, dividing Garfield Township on the West and Brooks Township 800,000 on the East.

$

637,250

Downtown Revitalization/Sustainability: Streetlights Replacement

Replace downtown streetlights with LED fixtures on Main, Broadway, University, Cour and Michigan (16 blocks) 6/1/20009

9/30/2010

$

Streets: Main, Broadway, University, Court, 4,000,000 and Michigan

City of Mt. Pleasant

Downtown Revitalizaton: Streetscape Expansion

Funding for the downtown Mt. Pleasant revitalization through the expansion of the streetscape project to additional blocks: Michigan from Oak to Washington & University to Lansing (4 blocks); Mosher from Lansing to Main (6 blocks).

6/1/2009

9/30/2010

$

Streets: Michigan 1,750,000 and Mosher

City of Mt. Pleasant

City of Mt. Pleasant

Create local programs to retrofit residential, commercial and/or government buildings for energy efficiency throughout PSD (downtown), utilizing SHPO for assistance on Downtown Sustainability: Energy Conservationmaterials & design. 6/1/2009

9/30/2010

$

City of Scottville Muskegon County Muskegon County

Scottville City Norton Shores Norton Shores

Scottville Water Tower Improvements Fire Station Four Bay Airport Fire Station

10/15/2009 10/31/2009 10/31/2009

$ $ $

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

u S

02262009

bm

Lead paint abatement from the City water tower and repainting of the tower. Four Bay Airport Fire Station

Submitted Requests - Not Approved

6/1/2009 6/1/2009 6/1/2009

Throughout 4,500,000 downtown Water tower on W. 267,000 First St 2,000,000 2,000,000

926 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Muskegon County Norton Shores Muskegon County Norton Shores Muskegon County Muskegon City Muskegon County Muskegon City

Newaygo County

Paul Oliver Memorial Hospital

Paul Oliver Memorial Hospital

Paul Oliver Memorial Hospital Village of DeTour Village Village of DeTour Village Village of DeTour Village Village of DeTour Village

Village of Schoolcraft

Project Name Airport Car Rental Rental Car Service Facility Juvenile Detention Center Jail Facility

Project Description

Start Date 6/1/2009 6/1/2009 7/1/2009 7/1/2009

Expected Completion Date 10/31/2009 10/31/2009 12/31/2010 12/31/2010

Rental Car Service Facility Replace Existing Juvenile Detention Center Replace Existing Jail

$ $ $ $

Funding Request 2,500,000 2,500,000 6,000,000 14,000,000

5/1/2010

$

325,000

9/1/2009

$

150,000

D VE

NEWAYGO COUNTY, TOWNSHIPS ARE AS FOLLOWS, ASHLAND, BARTON, BEAVER, BIG PRAIRIE, BRIDGETON, BROOKS, CROTON, DAYTON, DENVER, ENSLEY, EVERETT, GARFIELD, GOODWELL, GRANT, HOME, LILLEY, LINCOLN, MERRILL, MONROE, NORWICH, SHERIDAN, SHERMAN, TROY, AND WILCOX CAD

To upgrade the computer aided dispatch system for 911 police/fire/ems dispatching along with server upgrades for the new software application. Server upgrade would also cover county mapping GIS, implementation of computer aided dispatch in emergency units. Creating interopability between County emergency units, data sharing, and file sharing. Also including AVL (automatic vehicle location) tracking on dispatching software. Along creating interopability with serveral neighboring counties in the state using the same type of system. 5/1/2009

Frankfort, MI

Community Health Center

Creation of a free clinic adjacent to the hospital in Frankfort. The State of Michigan saw an increase in charity care of 40% on average, POMH saw a 110% increase from FY07 to FY08. Offering services limited free services to the population under FQHC guidelines woulf further help the health of our region. 5/1/2009

Dialysis

Currently there is no dialysis offered in benzie county Michigan. Benzie has been one of the top 5 percentage growing countuies over the last 10 years. With an average of over 120 inches of snow falling annually and the immediate needs of this group we anticipate an immediate impact by adding 4 chairs. Estimated impacts to the local population include an estimated reducation in 112,320 miles driven, and 5,105 gallons of gas consumed. 5/1/2009

12/1/2009

$

250,000

ER: Increase bed capacity and increase patient handling efficiencies to deliver greater care. Acute Care: Reloaction of beds next to ER to create nursing efficiencies and cross trian. In addition, space will be created to allow for future offering of greater telemedicine access. Patients can see their specialists over a secure videoconferenceing connection, this will save on travel time for patients and physicians. Creating a better servcie for an older population, and creating the ability for specialty physicians to maintain capacity through less travel. 5/1/2009

12/10/2010

$

1,500,000

Remove and replace generator and flow meter at wastewater lift station no. 1

7/9/2009

11/9/2009

$

80,000

Replace portable generator with a new portable generator with both a 3-phase plug and a 1-phase plug so that it can also be used for Lift Station #3 and 12 grinder pump stations if necessary. 7/9/2009

11/9/2009

$

63,250

11/9/2009

$

30,000

7/10/2009

$

1,650,000

Frankfort, MI

ub

DeTour Village

S

39979

02262009

t i m

e R

ER expansion and Acute Care Relocation Emergency Generator and flow meter for Lift Station #1

DeTour Village

DeTour Village

N s

Emergency Generator for Lift Station #2 Sewer Jetter Development of Business Park

B&L Dr. Water Main

t s e

qu

d e tt

Frankfort, MI

DeTour Village

T O

P P A

Replace the existing trailer mounted sewer jetter with a new one 6/9/2009 Construction of water main, sanitary sewer, storm sewer and road way to service up to 9 to 11 parcels. 7/9/2009

Schoolcraft Village

Submitted Requests - Not Approved

O R

11/15/2009

Route (Infrastructure Only)

B&L Dr. Water Main

$

B&L Drive Construct 290 L.F. of 8” water main to close the dead-end 24,000 to Clay Street.

927 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Schoolcraft

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

Schoolcraft Village

City of Mt. Pleasant

Infrastructure/Sustainability/Walkability: Bellows Street Redevelopment

Reduce traffic lanes on Bellows from Franklin to Mission to reduce speed & improve pedestrian safety: Install on-street parking & traffic circles; light traffic circles with LED solar street lights. May 11,2009

City of Mt. Pleasant

Infrastructure/Walkability: Downtown Street Improvements

Convert 1-way street to 2-way on Washington & Main from High to Illinois to reduce traffic speed & improve pedestrian safety; install on-street parking; install traffic circles to reduce traffic speed & improve pedestrian safety; light traffic circles with LED solar street lights. 5/18/2009

City of Mt. Pleasant

Downtown Revitalization/Infrastructure/Walkability: Intersection Redevelopment

Install raised intersection at Main and Broadway for reduced traffic speed and improved pedestrian safety.

Infrastructure Improvement: Traffic Circles

City of Mt. Pleasant

City of River Rouge City of River Rouge

River Rouge River Rouge

City of Hamtramck

City of Hamtramck

City of Hamtramck

City of Hamtramck

City of Fremont

Start Date

Willow Ct. Water Main

City of Mt. Pleasant

City of Fremont

Project Description

39979

City of Mt. Pleasant

City of Fremont

Project Name

Fremont City

02262009

Willow Court Construct 365 L.F. of 8” water main to close the dead-end 31,200 to Birch Drive.

$

8/28/2009

$

Streets: Washington and 200,000 Main

5/18/2009

7/31/2009

$

Streets: Main and 150,000 Broadway

Install traffic circles throughout residential neighborhoods in the city to reduce traffic speed and improve pedestrian safety. Light traffic circles with LED solar street lights. 5/18/2009

8/28/2009

$

300,000 Throughout city

7/13/2009

9/18/2009

$

350,000 Island Park

6/9/2009 7/9/2009

12/9/2009 1/10/2009

$ $

2,000,000 1,000,000

7/9/2009

12/9/2009

$

3,400,000 Lumpkin Avenue

7/9/2009

12/9/2009

$

2,600,000 Gallagher Street

Fremont's Joint Comprehensive Development and Growth Management Plan outlines the need for a new lift station to handle planned mixed-use developments. The City encourages mixed-use developments as part of a Smart Growth strategy. Funds will cover the installation of a lift station that will be located at 56th and Warner. 7/1/2009

9/1/2010

$

143,750

Fremont Brownfield Development Project on Elm Street (Brownfield/Economic Development)

The Newaygo County Brownfield Authority has identified a property on Elm Street in Fremont as a potential brownfield site. The funds will be used to test, evaluate, revitalize and market this potential brownfield site. The City wants to relocate the existing recycling business to the Fremont Industrial Park. Testing of the soils is necessary and clean up of the site is likely. The subject property is located near the downtown, and there is a possibility for the redevelopment of the site into multi-family housing, a city park, etc. 8/1/2009

8/1/2010

$

200,000

Fremont - New Well #11 and Wellhouse Project (Infrastructure)

The Fremont City's recent water system assessment identified the need for an additional well to provide long-term sustainability and growth of the municipal water supply system. Funds will cover the costs of a new well and wellhouse.

9/1/2010

$

400,000

A T

O N

Replace existing foot bridge to Island Park with a new pedestrian bridge that could be used by vehicles in an emergency. The park currently has only one vehicle access. This new bridge would provide a secondary entrance/exit in emergency situations. Infrastructure Improvement/Walkability: Oak This project would also reconstruct the street inside the park to provide access to this Street Bridge Replacement bridge. Replace existing 40 year old pumps , piping , valve , electrical gear , generator and Upgrading Ironton Pump Station build an enclosure Great Lakes Street Imporovements Street reconstruction including utilities impotents Removal and replacement of existing road pavement, storm sewer, and water main. Lumpkin Avenue Road Reconstruction Project Update all sewer manholes to current specifications Removal and replacement of existing road pavement, storm sewer, and water main. Gallagher Street Road Reconstruction Project Update all sewer manholes to current specifications

st

s

Fremont - Sewage Lift Station Project (Infrastructure)

e t tt

i m

ub

Submitted Requests - Not Approved

O R

PP

R d

S

$

Route (Infrastructure Only)

Streets: Bellows and Mission Road 150,000 (Bus US127)

eq

Fremont City

Funding Request

D VE

Willow Ct. Water Main

11/15/2009

e u

Fremont City

Expected Completion Date

7/1/2009

8/21/2009

928 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Fremont

Fremont City

Project Name

Project Description

Expected Completion Date

Start Date

Downtown Fremont Parking Lot Reconstruction Project (Economic Development)

In accordance with the Fremont Downtown Revitalization Enhancement Plan, the Fremont City will make improvements to three downtown public parking lots. Improvements include reconstruction of retaining walls, parking lot resurfacing, new decorative street lights, landscaping, etc. Improving these lots will assist businesses in meeting the needs of its patrons, which will aid in retaining businesses. 7/1/2009

9/1/2010

Funding Request

Route (Infrastructure Only)

D VE $

2,720,750

12/15/2010

$

2,510,000

City of Marine City

Marine City, MI

Renovation of Historic City Hall (300 Broadway)

This project would restore the interior, exterior and the grounds of the historic city hall facility. The building was listed on the State of Michigan Historic register on August 6, 1976, and entered on the National Register of Historic Places on January 11, 1982. In 2008, Historic 300 Broadway and its surrounding grounds and park became the cornerstone of Marine City’s Historic District with the State of Michigan. Currently on the preservation list of SHPO 7/1/2009

City of Port Huron

City

Relace Makeup Air Furnances

Replace aging makeup are for the secondary treatment builing at the wastewater plant6/1/2009

9/1/2010

$

City of Port Huron

City

Replace Raw Sewage Pumps

6/1/2009

9/1/2010

$

City of Port Huron

City

Replace Parks and Parking Lot Lighting

Replace three aging raw sewage pumps at the headworks of the plant Replace aging inefficient lighting with more efficient environmenally friendly fixtures and lamps

PP

7/1/2009

9/1/2010

$

City of Port Huron

City

Replace Blowers

Replace the blowers and diffusers in the WWTP secondary treament tanks

6/1/2009

12/10/2009

$

1,000,000 Across the City Wastewater 1,620,000 Treatment Plant

James St. Area Infrastructure Upgrades

The White Cloud City in the County Seat for Newaygo County. The County is working on an expansion of the County Jail. This would require the City to expand sewer and water to the site and also require upgrades to the roads to serve the facility 6/1/2009 Replace a 1904 constructed Saddler bridge with new structure removing the 9 ton weight limit, this will allow a better trucking / bussing route. Spring of 2009

6/1/2010

$

North St. and 1,000,000 William St.

Nov. 10 of 2009

$

125,000

Nov. 10 of 2009

$

125,000

Nov. 10 of 2009

$

125,000

Nov. 10 of 2009

$

130,000

Replace a 1900 constructed Hurleys Bridge with new structure. This primary road is a future Class A route that will connect US-131 to M-37. It has a 20 ft. wide bridge deck which is insufficient for this use. This will inprove saftey for the motoring public. Spring of 2009

Nov. 10 of 2009

$

700,000

Waterman Greening

Building and Infrastructure improvements to the Waterman Community Mental Health Services Building, which serves 150+ low-income persons each day. Dollars will be used to update existing HVAC system to geothermal and associated upgrades with heat pumps and other required infrastructure, as well as to replace the existing roof with a green system and install additional insulation. 5/1/2009

10/1/2009

$

1,000,000

Michigan Ave Health Center

50,000 s.f. building renovation project utilizing green building principles. Upon completion the building will house a community health center and administrative office along with a youth medical and counseling programs. The project will create numerous health care jobs and enable existing programs to expand in an underserved area. Dollars would be used to leverage $4,600,000 in funds committed to the project. 7/1/2009

8/1/2010

$

8,000,000

City of White Cloud Lake County Road Commission Lake County Road Commission Lake County Road Commission

White Cloud City Chase Twp.Sections 9 and 10

Saddler Bridge replacment

Chase Twp.Section 9

Depot Street Bridge

Elk Twp. Section 16

Polkensie Bridge

Lake County Road Commission

Webber Twp. Sections 25 and 36 Sheep Ranch Bridge replacment

Lake County Road Commission

Peacock Twp. Sections 2 and 11 Hurleys Bridge replacment

Southwest Housing Solutions

ub

Detroit

S Southwest Housing Solutions

Detroit

Village of Spring Lake Spring Lake Village

02262009

e u

Multiple Sidewalks

st

s

O N

Replace a 1929 Depot Street bridge with a new structure, This would remove the 16 tons limit on truck traffic. Also inprove soil erosion from entering the Middle Branch of the Pere Marquette River. Spring of 2009 Replace a 1954 constructed Polkensie Bridge with a new structure. Removing a 16 ton weight limit. This will open truck traffic. Spring of 2009

eq

Replace a 1924 constructed Sheep Ranch Bridge with new structure, this area has heavy soil erosion into the Baldwin River. New structure will have HMA surface with curb, gutter and spillways improving river quality.

R d

e t tt

i m

A T

O R

5,000 feet of sidewalk

Submitted Requests - Not Approved

Sring of 2009

8/9/2009

11/9/2009

$

Wastewater 350,000 Treatment Plant Wastewater 825,000 Treatment Plant

River, South and other streets near 300,000 schools

929 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Project Name

Project Description

Start Date

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit Division 1 Jail (Andrew C. Baird) with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is on-going at this time and a minimum commitment of $525,000.00 for this project will allow for Energy Saving Equipment to be replaced which would save much needed dollars and create jobs. 7/1/2009

PP

O R

Wayne County Detroit, Michigan

WCR - 11 (Wayne County Retrofit Project # 11)

Wayne County Detroit, Michigan

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit Wayne County Medical Examiners Office with Energy Savings Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved because of the reduction of energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce electrical costs and depending on the type of building infrastructure we can lower the amount of water usage, steam usage and natural gas usage. This new technology and equipment will provide an enhanced work environment for the employees which can increase productivity, reduce downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. Preliminary estimate as a result of the ongoing Energy Savings study this WCR - 2 (Wayne County Retrofit Project # 2) project is $2,000,000.00. 4/1/2009

11/1/2009

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit Division II Jail (Old Wayne County Jail) with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is on-going at this time and a minimum commitment of $225,000.00 for this project will allow for Energy Saving Equipment to be replaced which would save WCR - 3 (Wayne County Retrofit Project # 3) much needed dollars and create jobs. 7/1/2009

3/1/2010

A T

Wayne County

Expected Completion Date

s

t s e

3/1/2010

Funding Request

Route (Infrastructure Only)

D VE $

62,000

O N

u q e

R d

Wayne County

i m

ub

Wayne County Detroit, Michigan

e t tt

S 02262009

Submitted Requests - Not Approved

930 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Project Name

Project Description

Start Date

Wayne County Hamtramck, Michigan

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit Division III Jail (William Dickerson Detention Facility) with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is on-going at this time and a minimum commitment of $675,000.00 for this project will allow for Energy Saving Equipment to be replaced WCR - 4 (Wayne County Retrofit Project # 4) which would save much needed dollars and create jobs. 7/1/2009

Wayne County Detroit, Michigan

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit Juvenile Detention Facility with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is ongoing at this time and a minimum commitment of $175,000.00 for this project will allow for Energy Saving Equipment to be replaced which would save much needed WCR - 5 (Wayne County Retrofit Project # 5) dollars and create jobs. 7/1/2009

3/1/2010

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit Wayne County Office Building (640 Temple) with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is on-going at this time and a minimum commitment of $465,000.00 for this project will allow for Energy Saving Equipment to be replaced which would save 7/1/2009 WCR - 6 (Wayne County Retrofit Project # 6) much needed dollars and create jobs.

3/1/2010

A T

Wayne County

Expected Completion Date

s

t s e

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

3/1/2010

O N

u q e

R d

Wayne County

i m

ub

Wayne County Detroit, Michigan

e t tt

S 02262009

Submitted Requests - Not Approved

931 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Wayne County Detroit, Michigan

Wayne County Detroit, Michigan

Project Name

Project Description

Start Date

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit The Third Circuit Court (Frank Murphy Hall Of Justice) with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is on-going at this time and a minimum commitment of $1,500,000.00 for this project will allow for Energy Saving Equipment to be replaced WCR - 7 (Wayne County Retrofit Project # 7) which would save much needed dollars and create jobs. 7/1/2009

A T

WCR - 8 (Wayne County Renovation Project

t s e

O R

PP

Neighborhood Stabilization Program: Renovation of Foreclosed Property acquired by Wayne County Land Bank. Request for money to fund employees to renovate Land Bank Properties. This initiative will create jobs for the people that do the renovations and will and will help clean up blighted areas by ridding them of run down vacant properties. 5/1/2009

s

Expected Completion Date

O N

Local Goverenment Energy Efficiency Block Grants (EEBG) Or Energy Efficency Grants And Loans For Institutions: Retrofit The Kay Beard Office Building (30713 Michigan Avenue) with Energy Saving Equipment. With new Energy Saving Equipment being installed at this Facility, we will reduce our energy usage substantially. We can use the money saved from reduced energy usage and use it to help properly maintain the facility. With the installation of new equipment consisting of the latest state of the art technology, we will reduce the usage of the electrical, water,and natural gas utilities. This new equipment will enhance the work environment for the employees which will increase productivity, reduce the downtime of equipment that is in need of repair and reduce costs of repairing old, outdated equipment. An energy Study is on-going at this time and a minimum commitment of $416,000.00 for this project will allow for Energy Saving Equipment to be replaced which would save much needed dollars and create jobs. 7/1/2009

Funding Request

Route (Infrastructure Only)

D VE

3/1/2010

This Program can continue until the money is no longer available or all of the foreclosed properties have been renovated

u q e

R d

Webber Township

Wayne County Westland, WCR - 10 (Wayne County Retrofit Project # Michigan 10) 32nd and Astor intersection raise and Webber Twp. Lake Co. MI reconstruct Raise intersection apprx. 5-6 feet reconstruct, pave and stabilize banks. 32nd Street chip and seal M-37 West to Astor Webber Twp. Lake Co. MI Road Grade, gravel, widen, and chip and seal from M-37 West to Astor Rd.

Webber Township

N-E corner of Sheridian and Springtime Street Webber Twp. MI

Webber Township

Webber Twp. Lake Co. MI M-37 / US-10 corridor development project

Raise abandon buildings, install lighting, improve intersections, and signage

6/1/2009

10/1/2009

$

220,000

Webber Township City of Grand Haven

Webber Twp. Lake Co. MI Merrillville Rd. Chip and Seal Project Grand Haven City Wet well Replacement

5/1/2009 Spring 2009

9/1/2009 2009

$ $

540,000 80,000

City of Midland

City of Midland

Sugnet Water Main

5/20/2009

11/15/2009

$

City of Negaunee

City of Negaunee

Building Restoration

Widen, gravel, grade and chip seal from US-10 North to 32nd Street, 4 miles Sewer lift station replacement Install 24 inch water main to increase pressure and volumes in the northwest part of the city and for growth in Midland and Midland County. Repair exterior of historical buildings. City Hall: Building exterior repairs. Fire Hall: Roof Replacement, Hose Tower repairs, Building exterior repairs.

Unknown

Unknown

$

Wayne County Webber Township

i m

ub

S

02262009

e t tt

Municipal complex infrastructure

1/12/2009

5/1/2009

8/1/2009

$

65,000

5/1/2009

8/1/2009

$

130,000

Install sewer and water mains from 32nd Street South on Sheridian to Springtime Street, then west on Springtime to m-37

5/30/2009

9/30/2009

$

195,000

Submitted Requests - Not Approved

Main Street to 1,600,000 Dublin 800,000

932 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Madison Township, Madison Township Lenawee County Madison Township, Madison Township Lenawee County Muskegon County Norton Shores Muskegon County Norton Shores Muskegon County Norton Shores Muskegon County Norton Shores Muskegon County Norton Shores Muskegon County Norton Shores

City of Alpena

City of Alpena

Project Name Water Line west from Airport Hwy to Sand Creek Hwy

Project Description Add Water line to existing system to extend from Airport Hwy to Sandcreek Hwy Along Beecher to go North on Sandcreek to Marvin Drive.

Water Tower to west side of Township Airport Parking Airport Entrance Airport Entrance Road Reconstruction Airport Parking Lot Reconstruction Hangar Aircraft Hangar Development

Add Water Tower to the West Side of Madison Township. Airport Parking Lot Reconstruction Airport Entrance Road Reconstruction

Merchant Street reconstruction

$

8/1/2009

$

Water Production 125,000 Plant

City of Alpena

Ford Avenue Reconstruction

d e tt

City of Mt. Pleasant

City of Mt. Pleasant

Infrastructure Improvement: Pickard Street Bridge Replacement

City of Negaunee

City of Negaunee

City Alley Project

02262009

9/1/2009

The existing clear well is 70+ years old and while in good condition does have cracks within the walls allowing water to bleed out into the support embankment. This project would repair those cracks and seal the entire inside of the clear well 6/1/2009

Coating and sealing of the clear well at the Water Production Plant

Marine City, MI

6/1/2009

Merchant Street from Fletcher Street to Oldfield 140,000 Street

US-23 at thunder 175,000 Bay River

City of Alpena

City of Marine City

PP

O R

D VE

$

City of Alpena

it

m b u

S

850,000 1,000,000 1,000,000 1,000,000 1,000,000 3,000,000 3,000,000

8/1/2009

Municipal Parking Lot reconstruction

River Rouge

$ $ $ $ $ $ $

Replacement of Water Main River Crossing of The present river crossing is cast iron and laid on the river bed with no protection. The the Thunder Bay river new main would be installed via directional drilling and be below the river bed. 6/1/2009

City of Alpena

City of River Rouge

12/1/2009 10/31/2009 10/31/2009 10/31/2009 10/31/2009 10/31/2009 10/31/2009

$

City of Alpena

Norton Shores

6/1/2009 6/1/2009 6/1/2009 6/1/2009 6/1/2009 6/1/2009 6/1/2009

9/1/2009

Municipal Parking Lot reconstruction

City of Norton Shores

750,000

$

City of Alpena

Norton Shores

$

9/1/2009

City of Alpena

City of Norton Shores

12/1/2009

$

Commercial Street Reconstruction

City of Alpena

6/1/2009

9/1/2009

City of Alpena

City of Alpena

Reconstruct Street with replacement of aged water, sewer and storm sewer and installation of curb and gutter 360' or 0.07 miles

Funding Request

Route (Infrastructure Only)

Commercial Street from Fletcher Street to Oldfield 140,000 Street River Street and 200,000 Third Avenue Lockwood Street 175,000 and M-32

City of Alpena

City of Alpena

Aircraft Hangar Development

Start Date

Expected Completion Date

Getty St Reconstruction

A T

Reconstruct Street with replacement of aged water, sewer and storm sewer and installation of curb and gutter 360' or 0.07 miles 6/1/2009 Remove existing pavement, repair access approaches and curb and gutter, reshape and supplement aggregate base and pave 6/1/2009 Remove existing pavement, repair access approaches and curb and gutter, reshape and supplement aggregate base and pave 6/1/2009

s

t s e

O N

qu

Reconstruct Street with replacement of guard rail and drainage improvements 4,600' or 0.87 miles 6/1/2009

9/1/2009

$

Ford Avenue from Lafarge railroad Crossing to City 265,000 Jurisdiction

Replace the Arnold Sowmick Bridge on Pickard Street. The bridge over the Chippewa River is a main route through the city which carries 20,000 vehicles per day. The concrete on the existing bridge deck is deteriorating rapidly and in need of replacement. 5/18/2009

8/28/2009

$

400,000 Pickard Road

Repair, address drainage issues, repair utilities, resurface alleys throughout the community. Alleys do not receive any transportation money..

9/15/2009

$

500,000

e R

7/1/2009

Upgrading Combined Sewers

Reconstrucion of 1.15 miles of roadway including drainage improvements. 5/9/2009 Reconstrucion of 1.25 miles of roadway including drainage improvements and sidewalk. 5/9/2009 Upsize existing sewers , install new sewers to alleviate flooding of homes during rain events 6/9/2009

Bridge-to-Bay Trail Loop

Bridge-to-Bay Trail: This project would provide a trail loop to and through Marine City's Downtown area. Currently the Bay Trail runs along the Western boarder of the city. The trail loop would allow safe crossing of the Belle River with a trail bridge and provide a marked path to and through the riverside downtown area. 7/1/2009

Henry St Reconstruction

Submitted Requests - Not Approved

10/9/2009

$

10/9/2009

$

Getty St, Seaway Dr to Braodway 2,750,000 Ave Henry St, Hile Rd 1,850,000 to Seminole Rd

4/10/2009

$

1,400,000

10/1/2009

$

643,000

933 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Marine City City of Port Huron

Marine City, MI City

South Main Street Bridge Rebuild Stone Street Phase II

Project Description Reconditioning of bridge understructure and complete replacement of road surface. This is an MDOT requirement by 2012 Water main replacement and sanitary sewer extention

City of Port Huron

City

Erie North

Combined Sewer Overflow Control Project replace sewers, and water mains

Newaygo County Road Newaygo County Road Commission Commission

Fuel Facility

Northville Township

Northville Township, MI

Ridge Road/ 5 Mile Water Main Extension

Onsite fueling facility that will allow NEWAYGO County government entities to purchase fuel on a volume, wholesale pricing program saving thousands of dollars a month. 5/9/2009 Extending 16" - 20" Water Main South on Ridge Road 1250' to 5 Mile Road then East approximately 3900'. To length 6/1/2009

Schoolcraft Village

Schoolcraft Village

B&L Dr. Water Main

Schoolcraft Village

Schoolcraft Village

Willow Ct. Water Main

B&L Drive - Construct 290 L.F. of 8” water main to close the dead-end to Clay Street. 6/15/2009 Willow Court - Construct 365 L.F. of 8” water main to close the dead-end to Birch Drive. 6/15/2009

Village Wide Water Main

East Rose (RR Tracks to Wilson); East Vine (Spruce to Wilson); East Division (Richardson to Wilson); North Pearl (Division to RR Tracks); North Spruce (Division to Rose); Wilson (Prairie to Rose); Lee (Highway St south to end); Park (Raymond south to end); West Raymond (Park west to end); South Kalamazoo (Washington to Raymond); South Richardson (Raymond to Grove); West Park (Michigan to drain); West South (Kalamazoo to drain); East Highway (Pearl to Best); Raymond (Kalamazoo to Richardson) 6/15/2009

Village of Spring Lake Spring Lake Village

School Street Extension

New Street to complete the Downtown Spring Lake Grid and improve safety and circulation

Village of Middleville

The project consists of street improvements to West Main Street from Robin Street to 5th Street in the Village of Middleville. The project entails reconstructing West Main West Main Street Reconstruction Project from Street and installing storm sewer, storm water detention basin, water main Fifth Street to Robin Street. replacement, sidewalk and curb gutter. 5/31/2009

Vicksburg Village

Barton Township

Barton Township

Vicksburg

Village of Middleville, MI

Beech Ave. Barton Twp.

E.17 mile Barton Twp.

City of Alpena

City of Alpena

City of Kalamazoo City of Kalamazoo

City of Kalamazoo City of Kalamazoo

Project Name

12/1/2009 12/9/2009

7/1/2009

12/10/2009

O N

i m

1,374,000 678,000 Stone Street

D VE $

8,910,000 Various

230,000 n/a

$

889,508

11/15/2009

$

24,000

11/15/2009

$

31,200

6/15/2010

$

2,141,100

10/1/2009

$

$

West Main Street Reconstruction Project from Fifth Street to Robin 400,900 Street.

ASAP, Depending on Newaygo Grub,grade,gravel and pave Beech Ave. from 16 mile 4300' North. This section of Beech Ave. has been Prepared for paving by Grubing,grading and graveling. Cost to Road Comm. ? complete was $14,468.10 Newaygo County Road Commission Project # 488.01.02 Schedule.

$

142,953

Grub,grade,gravel and pave 17 mile from Cypress 11/2 miles west to entrance of Golf Course. 17 mile has had some preperation work finished in 2007. This preperation ASAP, Depending work consisted of Grub, grade and gravel of approximatly 1/2 mile between Cypress on Newaygo and elm cost to the Township was $42,791.71 Newaygo County Road Commission Road Comm. Project # 488.01.01 Schedule. ?

$

278,817

5/1/2009

Nov.15, 2009

R d

e t tt

$ $

$

O R

PP

u q e

Railroad Crossing Improvements

7/9/2009

Funding Request

Route (Infrastructure Only)

From Mill Point Station to Liberty 400,000 Street

s

Beech rd. paving

ub

5/1/2009 7/1/2009

A T

t s e

17 mile paving

Start Date

Expected Completion Date

Remove existing railroad crossing approach, work with railroad to adjust and repair crossing, Replace Railroad crossing approaches Valve Improvement - annual water valve exercise and replacement program Water Meter Improvement - annual meter capital replacement program

6/1/2009

8/1/2009

$

12/31/2009 12/31/2009

$ $

Grant Street, Third Avenue, Fifth 80,000 Avenue 210,000 249,000

S 02262009

Submitted Requests - Not Approved

934 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Mason County

Mason County

Pere Marquette Charter Township and the Ludington City, Mason County, Michigan

Pere Marquette Charter Township and the Ludington City, Mason County, Michigan

Muskegon County -Muskegon Area Transit System Muskegon Heights Section 9 Northville Northville Township Township Village of Caseville Village of Caseville

Project Name

Project Description

Start Date

Creamery Corners Outlet Extension IntraCounty Drain

The construction of storage facilities for the Creamery Corners Outlet Extension IntraCounty Drain. This drainage facility is severely overtaxed during major rain events. The inability to store rainwater during major rain events was a contributing factor in the failure of the Madison Avenue crossing structure in the Ludington City during a recent flooding. This drain also provides stormwater drainage for US 10 (Ludington Avenue) Business US 31, and the new Pere Marquette Charter Township First Street Industrial Park. Providing uninterrupted stormwater drainage to streets and roads that serve as access to and from local businesses is imperative to the continued success of these business. 5/1/2009

Jackson Road Drain

Reconstruction of the Jackson Road Drain system. This aging storm sewer causes major flooding in and near major business facilities. It is the desire of the County to secure funding to make coumplete and permanent improvements to this drainage facility in order to improve access to and the ability of local industries to withstand future flood events. Providing uninterrupted stormwater drainage to streets and roads that serve as access to and from local businesses is imperative to the continued success of these business. 5/1/2009

Transit Fare Equipment Upgrade

Purchase and install upgraded fare collection equipment for Muskegon Area Transit System.

Pickford Watermain Replacement Phase I M-25 streetlights

Rerouting and replacing cast iron water main with ductile iron pipe. Continue decorative streetlights from M-25 bridge to Emerich Dr

T O

s t s

Expected Completion Date

O R

-N

D VE $

200,000

8/1/2009

$

300,000

7/1/2009

6/30/2010

$

600,000

6/1/2009

10/1/2009

$ $

1,367,564 53,906

$

800 feet of Crane Road west of the Intersection of Crane Road and Whitneyville; acquistion of new right-of-way and construction of a 2500 foot roadway extension from the terminus of Crane Road west of the Crane Road/Whitneyville Road intersection 8,916,758 on the e

P P A

8/1/2009

Funding Request

e u

d e tt

Village of Middleville

Barry County, MI

02262009

S

ub

t i m

Finkbeiner/Crane Street and Bridge

q e R

The proposed project involves reconstruction of an existing county road and construction of a road extension with a new bridge over the Thornapple River and a bridge over Spring Creek.

Submitted Requests - Not Approved

Route (Infrastructure Only)

5/1/2009

12/1/2010

935 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Project Name

Project Description

Start Date

Economic Development Tracking Management System for Business Attraction and Retention

This will establish IT systems to track business development, attraction and retention activities in Wayne County-Detroit, Michigan, for mandated and conceptual projects. For the purpose of job creation, retention, company expansion, additions, and retention. This project will implement & integrate an enterprise content management (ECM) system that will provide a Document Management system that will serve as the repository for business documents as well as organizing, displaying, classifying, access control, version control, event auditing, rendition and search services for the documents and their content. A Records Management System that will enable control of the complete lifecycle of content objects by associating robust retention and disposition rules with each content asset. These rules control if and when content can or must be deleted or archived on less costly storage media. And a Business Process Management (BPM) system that will provide the tools for analyzing, deploying, executing, and monitoring the daily business processes in which content is referenced to make decisions and people make the decisions. Cost: $1,200,000

eLearning

The web-enabled E-learning system will provide 24/7 training opportunities for the Wayne County employee workforce. One of the key objectives of this e-learning system is to provide convenient and easily accessible course listings, online registration, and archive of video recorded lectures and distance learning opportunities, flexible Course Content updates, New Content uploads. Members will be able to tracks schedules, registration and attendance of employees for online and offline courses. Training Administrator of the departments will have the ability to upload their Content designed using any media into the system and update accordingly. Cost: $250,000

Wayne County

Legal Case Management System

PP

O R

Funding Request

1,200,000

$

250,000

Wayne County seeks to enhance legal case management by providing greater transparency, automated case management, electronic filing, and higher productivity and efficiency. This project will implement & integrate an enterprise content management (ECM) system that will provide a Document Management system that will serve as the repository for business documents as well as organizing, displaying, classifying, access control, version control, event auditing, rendition and search services for the documents and their content. A Records Management System that will enable control of the complete lifecycle of content objects by associating robust retention and disposition rules with each content asset. These rules control if and when content can or must be deleted or archived on less costly storage media. And a Business Process Management (BPM) system that will provide the tools for analyzing deploying, executing, and monitoring the daily business processes in which content is referenced to make decisions and people make the decisions. Cost:$500,000

$

500,000

Wayne County seeks to reduce costs, increase data accuracy and availability, and increase operational efficiency by developing an electronic Social Case Management system. This project will implement & integrate an enterprise content management (ECM) system that will provide a Document Management system that will serve as the repository for business documents as well as organizing, displaying, classifying, access control, version control, event auditing, rendition and search services for the documents and their content. A Records Management System that will enable control of the complete lifecycle of content objects by associating robust retention and disposition rules with each content asset. These rules control if and when content can or must be deleted or archived on less costly storage media. And a Business Process Management (BPM) system that will provide the tools for analyzing, deploying, executing, and monitoring the daily business processes in which content is Children and Family Services Case Management System Head Start Automation referenced to make decisions and people make the decisions. Cost: $500,000

$

500,000

s

t s e

O N

Route (Infrastructure Only)

D VE $

A T

Wayne County

Expected Completion Date

u q e

Wayne County

Wayne County

b u S

i m

Wayne County

Wayne County

02262009

e t tt

R d

Submitted Requests - Not Approved

936 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County

Wayne County

Project Name

Project Description

Start Date

Expected Completion Date

Veteran Affairs Automation and Integration

Wayne County seeks to create a Veterans Electronic Medical Records system that ensures immediate availability of health information, transparency, data and health care accuracy, and trackability. This project will implement & integrate an enterprise content management (ECM) system that will provide a Document Management system that will serve as the repository for business documents as well as organizing, displaying, classifying, access control, version control, event auditing, rendition and search services for the documents and their content. A Records Management System that will enable control of the complete lifecycle of content objects by associating robust retention and disposition rules with each content asset. These rules control if and when content can or must be deleted or archived on less costly storage media. And a Business Process Management (BPM) system that will provide the tools for analyzing, deploying, executing, and monitoring the daily busines processes in which content is referenced to make decisions and people make the decisions. Cost: $500,000

Wayne County Radio Communications

In Wayne County there are eleven disparate radio systems. The City of Detroit uses the Michigan Public Safety Communications System (MPSCS) for radio communications. With the requested tower infrastructure, there are forty other communities in Wayne County that could migrate to this system and we could have true interoperability within Wayne County and with the rest of region. Wayne County has prepared all of its existing municipalities that are capable of 800MHz use, by upgrading their radios. This preparation has laid the ground work for the full use of the MPSCS system in those municipalities. In addition, Wayne County has an additional seven 800 MHz frequencies that can be used on the MPSCS. Spectrum efficiency is not an issue with the available talk groups to be used on the system. The frequency allocation of a subsystem in zone seven (SE Michigan) will not degrade the level of service on the system. Both the MPSCS and Motorola have identified the ability of the system to sustain the additional users in Wayne County. In Wayne County, The MPSCS had three towers originally. These three sites have been joined by an addition

T O

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE $

500,000

$

63,000,000

$

750,000

12/31/2009

$

1,700,000

4/1/2009 8/9/2009

12/31/2009 10/10/2009

$ $

6/10/2009

9/11/2009

$

2,100,000 2,000,000 Divine Highway Grape and Detroit 1,770,000 Streets

N s

Wayne County

Romulus, MI Wayne County

Wayne County

S

White Cloud/Sherman White Cloud City and Utilities Authority Sherman Township City of Portland City of Portland City of Portland

City of Portland

02262009

e R

Health and Human Services Process Automation and Electronic Medical Records Integration

sewer main upgrades

Rehabilitate 12,000 feet of ageing sewer main with the addition of 69 manholes, and upgrades to pump stations to include emergency back-up generators. 4/1/2009

Upggrade to wastewater treatment plant Divine Highway Improvements Grape/Detroit Street Road and Utility Improvements

Irrgation/Aeration reconstruction and upgrades to wind powered generators to wastewater treatment plant. Reconstruct Divine Highway between the Grand River and City limit Reconstruct Grape Street between Grand River Ave. and Ionia Street and Detroit Street from Grape to west end.

t i m

ub

White Cloud/Sherman White Cloud City and Utilities Authority Sherman Township

qu

Wayne County seeks to create an Electronic Medical Records system that ensures immediate availability of health information, transparency, data and health care accuracy, and trackability. This project will implement & integrate an enterprise content management (ECM) system that will provide a Document Management system that will serve as the repository for business documents as well as organizing, displaying, classifying, access control, version control, event auditing, rendition and search services for the documents and their content. A Records Management System that will enable control of the complete lifecycle of content objects by associating robust retention and disposition rules with each content asset. These rules control if and when content can or must be deleted or archived on less costly storage media. And a Business Process Management (BPM) system that will provide the tools for analyzing, deploying, executing, and monitoring the daily busines processes in which content is referenced to make decisions and people make the decisions. Cost: $750,000

d e tt

Wayne County

t s e

Submitted Requests - Not Approved

6/10/2009

937 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Portland City of Portland

City of Escanaba

Wayne County

City of Escanaba

City of Portland City of Portland

Escanaba

Project Name

Expected Completion Date

Cutler Road Reconstruction New Well

Project Description Start Date Reconstruct Cutler Road with storm water improvements between Charlotte Highway and Grand River Avenue 8/9/2009 Development of new drinking water well 8/9/2009

10/10/2009 10/10/2009

North Town Business District Improvements

The area is a defined neighborhood business district with no public off-street parking. Improvements will include the installation of an off-street parking lot, lighting, standardized signage and street furniture. This improvement will encourage investment in what will become a historical district. (Priority: 3 - Desired) 7/9/2009

9/9/2009

City of Hamtramck: 2217 Andrus 2225 Andrus 2261 Andrus 2312 Danforth 2323 Danforth 11715 Fleming 12056 Lumpkin 11668 Nagel 2341 Neibel 12012 Saint Aubin 12015 Strategic Nuisance Abatement Program Saint Aubin (SNAP)

The Strategic Nuisance Abatement Project is designed to remove blight and return property to productive use. This project will focus on the demolition and deconstruction of vacant and blighted properties as well as the creation of urban gardens and additional green space. The project will also work in conjunction with the local municipalities of Hamtramck and Westland. The Development Director and Code Enforcement officals of both cities are putting their staff resources to work in order to realize maximum development and job creation. The demolition activity will create both skilled and unskilled jobs. The deconstruction activities create environmentally friendly (green) jobs as materials are recycled. The workers also learn aspects of construction including safety. The Urban Gardening aspect of the project will provide food and jobs for the community, Food Co-ops will be formed in conjunction with the activities of neighborhood groups and other non-profits. Nutrition will also be a critical component of this project. 4/1/2009

Escanaba

Remove and replace street surfacing, curbing and sidewalks for approximately 9 blocks. Furnish and install new storm water collection system and piping, water main and sanitary main. (Priority: 1 - Mandatory/Critical) 7/9/2009

T O

Stephenson Avenue Reconstruction

s t s

Funding Request $ $

980,000 Cutler Road 400,000

D VE $

125,000

8/1/2009

$

6,000

10/9/2009

$

1,700,000

12/1/2009

$

200,000

$

12,000,000

O R

Route (Infrastructure Only)

P P A

-N

e u

Wayne County

Wayne County

d e t

Geographic Information System (GIS)

itt

q e R

m b u

S National Center for Manufacturing Sciences

Ann Arbor, MI

02262009

Wayne County seeks to provide flood prevention information to our residents and businesses to enhance public safety and awareness. This will require county flood plain data to be loaded into our GIS environment. Wayne County currently does not have the data to generate flood plain graphical maps. The data source for this information would come from FEMA who currently has extensive mapping of flood plain data for Wayne County (and the entire country). Once we aquire this type of data from FEMA and with other sources (e.g. Department of Agriculture), Wayne County will create maps of residences that are in the highest risk flood plains and notify them. Funding will be required to secure flood information. Cost: $200,000 6/1/2009

Center for Direct Manufacturing Technology

NCMS proposes to establish a one-stop center in Michigan for stimulating new crossindustry collaborations applying High-Performance Computing for Direct Manufacturing (DM) to further the development and sophistication of laser-based direct manufacturing processes and systems. The Center will leverage our fifteen years of collaborative strength and experience in rapid prototyping, manufacturing, Lean and Green product design, advanced materials and high-performance computing, in order to target these capabilities for low-to-medium volume manufacturing of new products addressing Michigan’s emerging alternative energy, biomedical, automotive and homeland security/defense markets. Direct manufacturing technology automatically builds parts in layers, such as with a laser, based on a computer-aided design (CAD) dataset. By definition, it meets Lean and sustainability principles in that no tools are needed to manufacture perfectly functional parts, and that parts are made from bottom-up processes. While direct manufacturing technologies are already being used to develop production prototypes, only limited cas6/1/2009

Submitted Requests - Not Approved

938 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

National Center for Manufacturing Sciences

Ann Arbor, MI

Project Name

Project Description

Start Date

Partnership for Innovative Supercomputing Applications for Defense and Manufacturing

The beginning of the 21st century has brought unprecedented challenges to the U.S. economic engine. Our technological leadership has eroded with substantial offshore migration of manufacturing across a broad set of industries. Even more serious is the threat that engineering, design and research and development will also follow this trend. At the same time, revolutionary advances in cyber infrastructure (CI) are transforming the way we live, work, and socialize. New tools, fast networks and cheap storage make it possible to use and share data and models in ways never before possible. However, U.S. industry has yet to fully capitalize on these advances and their enormous potential for transforming the design - product development manufacturing cycle. The National Center for Manufacturing Sciences (NCMS), in collaboration with The U.S. Army Tank-Automotive Research, Development and Engineering Center (TARDEC), academia and several major U.S. industrial manufacturers and their suppliers, propose a Partnership for Innovative 2nd Quarter of Supercomputing Applications (PISA) for Defense and Manufacturing. Utilizing the pow 2009

Medical Technician and Front Office Staff Computer-Based Interactive Training

Medical technicians and clinic front-office employees are in high demand even in a troubled economy, but practical and effective training for these individuals remains rooted in the past. Most private clinic-management organizations depend on “brick and mortar” training for new hires, often requiring significant expenditures in travel and maintenance of training facilities. NCMS proposes developing a comprehensive package of training for both medical techs and front office employees using cuttingedge interactive simulations and web-based multimedia training. An effective curriculum covering this material would save millions of dollars within just a few years, while providing better training for employees in this high-turnover sector. The curriculum will be broken into two main units: medical technician procedures (such as administering an EKG, drawing blood, proper bedside manner, etc.), and front office procedures (use of patient database software, recordkeeping, etc.). All courses will be highly interactive, featuring original art, animations, video, games-based learning simulations, and advanced instructional design. NCMS Educational Services is confid

T O

National Center for Manufacturing Sciences

Ann Arbor, MI

City of Rochester Hills

Innovation Center

Blackman Township Blackman Township

Blackman Twp Blackman Twp

Bob McClain Drive County Farm Road Lift Station

i m

b u S Michigan Research Institute

Ann Arbor, MI

02262009

Lightweight high-strength vehicle body structures

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE $

20,000,000

$

1,500,000

N s

t s e

u q e

The City and Oakland University are proposing to construct a new innovation center to serve as a business incubator facility and center for research & development in alternative energy systems, life sciences and automation. The facility will replace the existing incubator, which is at capacity and lacking in laboratory and shop space. The facility as proposed is 220,000 square feet and will contain corporate office, wet labs, general laboratory modules and shop space. The City owns the land on the proposed site. 5/9/2009 Install road, sanitary sewer, storm sewer and watermain for a commercial park in DDA. 6/1/2009 Replace pumps on a existing sewage lift station 5/1/2009

5/11/2009

$

8/1/2010 7/1/2009

$ $

7,200,000 60,000

Every new platform design effort for vehicles stress the need for a new approach to acheive ever increasing requirements for weight, performance and survivability. Providing stronger safer structures while reducing weight is a key goal in many industries which are of national importance. Whether it be for armored military vehicles critical to the mission of the Department of Defense or lighter and stronger passenger vehicles that improve crash safety, rollover and fuel efficiency, taxpayer dollars are warranted in pursuit of these goals. Overall savings to the nation are significant, enabling DoD to meet its mission, reducing the nation’s dependency on fossil fuels and ensuring the safety of the public and our military personnel. This project will use a radical spaceform welding approach to lighten vehicles and help to reach the ongoing requirements listed above. Current partners include Delphi Corporation, Spaceform Inc., Monarch Antenna Systems, Michigan State University and General Motors. Immediately

Ongoing

$

5,000,000

R d

e t tt

City of Rochester Hills

Expected Completion Date

Submitted Requests - Not Approved

Science & 24,500,000 Technology

939 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

National Center for Manufacturing Sciences

National Center for Manufacturing Sciences

Ann Arbor, MI

Global Traffic Technologies

Project Description

21st Century Learning: Improving Academic Achievement with Advanced SimulationsBased Learning Technologies

Ann Arbor, MI

Northville Township, MI

u S

Bloomfield Township, Michigan

02262009

Start Date

K-12 education is at a crossroads. The current model of pedagogy which has worked for so many years is beginning to suffer under standardized testing and the reduction of teacher involvement in the teaching process. More serious, however, is the simple fact that there is more now for young people to learn than there ever was before – and traditional methods of education are simply not equipped to provide such volume of education in a comprehensive way. NCMS Educational Services, long a pioneer in electronic and distance learning technologies, proposes a one-year research program into the feasibility of aggressive introduction of simulation- and games-based learning into K-12 classrooms. Games-based learning is already used by major corporations, police units, the military, surgical educators, and pilot training programs. Simulations offer many benefits that the traditional textbook/lecture approach cannot: specifically, simulations require that the learner absorb and assess an enormous amount of information very rapidly, collate, catalogue, sort, and comprehend that information in 2nd Quarter of real time, make decisions based on what has been learned, and then deal immediately2009

PP

2,000,000

6/30/2010

$

15,600,780

8/9/2009

$

200,000

Five (5) intersections and twenty- two (22) emergency vehicles designated by the Northville Township Public Safety Department will be equipped with GPS traffic signal priority equipment that will help emergency responders get to their destinations by changing a red light to green or sustaining a green light for the emergency vehicle to proceed quickly and safely through the intersection. Improves safety by eliminating right-of-way conflicts at the intersection. Studies show signal priority systems improve response times by an average of 20%.

$

152,375

Twenty-eight (28) intersections and twelve (12) emergency vehicles designated by the Bloomfield Township Fire Department will be equipped with GPS traffic signal priority equipment that will help emergency responders get to their destinations by changing a red light to green or sustaining a green light for the emergency vehicle to proceed quickly and safely through the intersection. Improves safety by eliminating right-of-way conflicts at the intersection. Studies show signal priority systems improve response times by an average of 20%.

$

384,300

A T

t s e

O N

qu

d e tt

it

bm

Bloomfield Township Fire Department Emergency Traffic Priority System

e R

Route (Infrastructure Only)

D VE $

For the last ten years, North American manufacturing companies have been adopting the methodologies and techniques of “lean manufacturing” based on the principles of the Toyota Production System. As a result, manufacturing productivity of these companies has been significantly increased. More recently, these same companies have realized that further gains can be achieved by adopting “lean product design” methodologies, again based on the principles of Toyota. Similarly, recent years have seen an increased awareness of the need for sustainable, or “green” manufacturing processes. What is just beginning to be recognized by industry is the need to design sustainability, or greenness into the product up front, before it hits the manufacturing floor. The European Union estimates that 80% of all product related environmental impacts are determined at the design phase. Many times, waiting to address these environmental concerns on the factory floor is too late and is wasteful. For the past Lean & Green Product Development for Small decade, NCMS has been a leader in conducting collaborative research, development, and Medium Sized Michigan Companies and technology transfer programs in both the areas of Lean Product Development and7/1/2009 Jackson Street has an historic dock on Spring Lake that is failing and needs Jackson Street Dock Reconstruction reconstruction 6/9/2009

Northville Public Safety Emergency Traffic Priority System

O R

Funding Request

4th Quarter of 2010

s

Village of Spring Lake Spring Lake Village

Global Traffic Technologies

Project Name

Expected Completion Date

Submitted Requests - Not Approved

940 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Novi Fire Department Emergency Traffic Priority System

Project Description

Start Date

Forty (40) intersections and twenty- five (25) emergency vehicles designated by the Novi Fire Department will be equipped with GPS traffic signal priority equipment that will help emergency responders get to their destinations by changing a red light to green or sustaining a green light for the emergency vehicle to proceed quickly and safely through the intersection. Improves safety by eliminating right-of-way conflicts at the intersection. Studies show signal priority systems improve response times by an average of 20%.

Global Traffic Technologies

Novi, MI

City of Coloma

City of Coloma

City of Coloma

City of Coloma

Madonna University

“Distance Learning to Prepare Sign Language Interpreters to Meet State Requirements for Practice” will address the projected shortage of qualified and certified Sign Language interpreters who must meet new State requirements for practice. Under the new law, paid ASL interpreters must possess a bachelor’s degree and earn national certification (in the absence of the former State certification). Madonna University proposes to increase access to its Sign Language interpreting, which is the only such four-year bachelor’s degree program in Michigan by using a blended delivery system that includes interactive video, online instruction, and Metropolitan Detroit classroom meetings. The goal is to recruit a minimum of 15 students at three off(Wayne County, Macomb campus sites at Gaylord and Clinton Township (year 1) and Orchard Lake (year 2) County, and Oakland County); the northern Distance Learning to Prepare Sign Language over a two-year period. In addition, the University will establish support Michigan vicinity of Interpreters to Meet State Requirements for services—online and on-site—to ensure that the students are successful in their academic program. 9/1/2009 Gaylord, MI Practice

East Logan Street Local Road Reconstruction from Paw Paw Street to Sassafras Street Reconstruct local road, drainage and sidewalks to serve residential neighborhood. Coloma Heights Subdivision Road Reconstruct local roads and drainage and sidewalks to serve residential Reconstruction neighborhood.

T O

Madonna University

Expected Completion Date

s t s

P P A 6/1/2009

-N

e u

Southeastern Michigan/Wayne County/Oakland County, MI

The Nurse2 Project

t i m

d e tt

Nursing shortages continue to escalate in the State of Michigan and throughout the United States. Key to addressing this issue is the shortage of qualified instructors. Madonna University is equipped to provide increased access to advanced nursing education through ADN (Associate Degree in Nursing) to BSN (Bachelor of ScienceNursing), BSN to MSN (Master of Science-Nursing), and DNP (Doctor of Nursing Practice) degree programs. Through these degree programs, Madonna University’s “Nurse2 Project” will offer education to registered nurses to prepare them to function as more fully empowered members of the healthcare industry, utilizing a variety of instructional delivery modes, including face-to-face, interactive video, and web-based methods.

q e R

July 2009 (Student recruitment and admission begins)

D VE $

487,500

$

190,000

11/1/2009

$

300,000

August 2011 (at least 90% of students will be actively enrolled and academically successful)

$

404,629

June 2011 (first cohort of students expected to graduate in May 2011)

$

900,000

O R

6/1/2009

Funding Request

11/1/2009

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

941 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Madonna University

Project Name

T O

Madonna University Blackman Township Blackman Township City of Alpena

City of Alpena

Increasing the Number of Underrepresented/Minority Science and Mathematics Teachers Fire Gear Replacement Clinton Road Lift Station Water Production Plant Diesel Pump Replacement

d e t

City of Harbor Springs City of Harbor Springs

Pennsylvania Avenue Reconstruction

City of Harbor Springs City of Harbor Springs

Wequetonsing Watermain

City of Hudson

City of Hudson

Bean Creek Public Access

City of Midland

City of Midland

City of Midland

City of Midland

Start Date

Improve STATUS is a web portal that allows community-based organizations and small businesses across southeast Michigan to request technical assistance from Madonna University faculty and students developing applications such as web sites, office applications, databases or health promotion campaigns. The portal offers users: 1) a portfolio of core computer applications, tools and utilities that are suitable for southeast community-based organizations and small businesses, and, 2) an online "request-for-technical assistance" option. 3) a collection of online educational resources supported by mentors Key activities related to the development of a valuable application portfolio are a) information-gathering about the IT/IS needs from the community organizations themselves, and b) the provision of consultancy services for the effective development of the customized system and effective training for theuse of the applications and tools provided. (c) The project will also conduct information gathering from non profits and community organizations on the training Metropolitan Improve STATUS (Systems, Tools, Detroit/Wayne County, MI Application, Utilities and Training for Service) needs of their members, customized courses will be created and delivered to them fo 9/1/2009

Metropolitan Detroit, including a site in Southwest Detroit, MI Blackman Twp Blackman Twp

City of Midland

Project Description

City of Midland

City of Midland

02262009

st

q e R

D VE 282,000

August 2011 (at least 90% of students will be actively enrolled and academically successful) 10/1/2009 7/1/2009

$ $ $

509,190 70,000 75,000

9/1/2009

$

Water Production 125,000 Plant

Roadway, Sidewalk & Watermain Construction

4/27/2009

6/26/2009

$

325,000

4/27/2009

10/31/2009

$

275,000

Wheeler Water Improvement

Watermain Construction Enhance and protect the existing trail along Bean Creek and create access to the creek for all Installation of new water main to provide clean drinking water for growth in the northeast area of Midland and Midland County.

Sanitary Sewer Improvement Program

Computer modeling of City local sewer system has determined that improvements are needed to meet 50 year rain events. Phase I of the program is would complete the East Ashman district work. 6/1/2009

Sewer Lining Projects

Enhance existing piping infrastructure by installing internal epoxy liners using proven non-destructive methods. Liners improve the strength of the pipe and keep ground water out of the sanitary sewer system April 20,2009

Waldo Improvements

Installation of new water main to provide clean drinking water for growth in the northeast area of Midland and Midland County. Also, to increase capacity of the sanitary sewer to handle peak storms and protect against flooding. Projects to be simultaneous for efficiency and to reduce costs.or efficiency projects.

tt i m

b u S

City of Midland

N s

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

This project is expected to continue into the foreseeable future. The Portal is created. Money is requested to expand the program to employ a full time portal administrator for 2009 through 2010, and to support students working on the project through 201 $

O R

P P A

“Increasing the Number of Underrepresented Science and Mathematics Teachers” wil address the shortage of minority teachers in the STEM disciplines through the following activities: (1) recruit ten disadvantaged minority students and offer them tuition assistance for pursuing teacher certification in one of the STEM fields; (2) providing needed support services to ensure the students’ success, such as a special advisor, summer academic skills/technology “boot camp,” coordinated tutoring and workshops to prepare them for standardized testing, and supplemental instruction; (3) leadership training and enrichment activities; (4) financial assistance for transportation; and (5) opportunities to participate in collaborative student-faculty research projects. 9/1/2009 Replace older fire gear for 28 firefighters 7/1/2009 Replace pumps on a existing sewage lift station 5/1/2009 Replace a 1963 diesel backup pump with an electric pump elevated above the flood area of the plant 7/1/2009

e u

Expected Completion Date

Summer of 2009 Summer of 2010

$

5/15/2008

8/30/2010

$

1,100,000 Waldo to Swede

11/15/2009

$

1,520,000 Various Locations

12/15/2009

$

1,800,000 Various Locations

8/30/2010

$

Waldo- Ashman to 2,400,000 Wheeler

5/15/2008

62,000 M 34

942 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Midland

City of Midland

Project Name

Project Description

Start Date

Landfill Methane Recovery Project

Install methane collection system to reduce emmissions from landfill. Transport methane via pipeline to a municipal renewable energy facility. Install 2 megawatt (expandable) generating facility. Sale of energy to municipal facilities to reduce energy costs. Installation of a sewage sludge pipeline to the landfill bio-reactor for additional methane production. 4/20/2009

8/30/2010

190 days from start

City of White Cloud

White Cloud City

Water System Improvement

Water System improvements from the north end of Webster St. to east end of Washington St. in Industrial Park by placing 1200 feet of 12inch watermain plus 200 ft bored and jacked

City of White Cloud City of White Cloud

White Cloud City White Cloud City

Industrial Park Water Main Loop White Cloud City Master Plan

To loop the Industrial Park water main with instillation of 12 inch watermain A full rewrite of the Cities Master Plan

White Cloud City

Road and utilities improvements to James Street 1,500 ft from M-37 to North Street, Williams Street 500 ft from James St to Newell Street and Williams Street 900 ft from James, Williams & North Street Improvement James St to Wilcox Ave.

Detroit, Pontiac and Flint Michigan

The creation of an “urban worker training model with jobs placement” that will provide new opportunities for Michigan residents to acquire skills and techniques to be used in the high growth and emerging “Green Industry”. The objective being to develop a Pilot project to tap into the under-served urban labor market in Detroit, Pontiac and Flint, that will meet the employment needs of a rising “green industry”. This will, thereby, provide economic growth for these urban areas, and green industry enhancement Project Urban Green Industry, A Proposal for through this new skilled labor force. This initiative will prepare and place five thousand An Urban Training Program with Jobs urban residents within these pilot cities, and will be a collaborative approach where the Placement for Careers in the Green Collar faith based and community based organizations provide intake and mentoring support Industry services and community colleges provide workforce skills training and development. 4/1/2009

City of White Cloud

T O

eBusiness Strategies

Macomb County

Macomb County Madison Township

Expected Completion Date

eq

4/1/2011

$

3,117,120

Commence the bid process within 90 days after receipt of 6 months after approval of commencement of funding construction $

400,000

10 N. Main St., Mt. Clemens, MI 48043 Madison Township, Lenawee County

Commence the bid process within 90 days after Renovate and remove package water cooled units and tie into existing chilled water receipt of County Building 1st Floor Cooling System and system. These units will bring in fresh air for indoor air quality. This will save on wate approval of IT Cooling System and sewage costs. funding Back-up generator for Township Complex. To include allowing for back-up power for Back-up Generator secondary County Dispatch ( Fire and EMS) 5/1/2009

it

e t t

100,000 Industrial Park area White Cloud 5,500,000 Industrial Park 7,000

$

Jail Domestic Hot Water System Tank Replacement

R d

$

190 days from start

43565 Elizabeth St., Mt. Clemens, MI 48043

m b u

The hot water system is old and inefficient and in constant need of repair. New equipment would be energy efficient and reduce cost.

5,500,000 Municipal Landfill

$ $

P P A

N s

D VE $

90 days from start 12/31/2009

current

st

e u

O R

Funding Request

10 months after commencement of construction $ 8/1/2009

Route (Infrastructure Only)

$

Around County 750,000 Complex

300,000 35,000

S 02262009

Submitted Requests - Not Approved

943 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Mecosta County Medical Center

Big Rapids, Mecosta County

Project Name

Project Description

Start Date

Jobs for Michigan plus Health Care For the Economically Disadvantaged

Mecosta County Medical Center (MCMC) is proposing a shovel ready health care infrastructure project based on already completed architectural and engineering studies, community needs assessment, preliminary drawings, and cost estimates provided by David E. Johnson Architects. This project meets every goal in the Michigan Economic Recovery for Jobs MISSION STATEMENT • Provides 275-350 new jobs for the two years of construction. • Adds 110 – 150 future new permanent health care jobs in the Medical Center and related medical services in the region, and preserves 451 jobs currently held by medical center staff. • The project can be started in 90 – 150 days with full disbursement in two years. • The three addition project will include a new laboratory, physician’s and specialty physician’s offices, a cancer and cardiac care, rehabilitation, and wellness center, an education center, a new critical care unit, pharmacy, outpatient care unit, single patient/family rooms, food service unit, and a high efficiency, green central energy plant. Centrally located in one of the most economically disadvantaged regions in Michigan (Kids Count 2008, Primary Hea5/1/2009

Jobs for Michigan plus Health Care For the Economically Disadvantaged

Mecosta County Medical Center (MCMC) is proposing a shovel ready health care infrastructure project based on already completed architectural and engineering studies, community needs assessment, preliminary drawings, and cost estimates provided by David E. Johnson Architects. This project meets every goal in the Michigan Economic Recovery for Jobs MISSION STATEMENT • Provides 275-350 new jobs for the two years of construction. • Adds 110 – 150 future new permanent health care jobs in the Medical Center and related medical services in the region, and preserves 451 jobs currently held by medical center staff. • The project can be started in 90 – 150 days with full disbursement in two years. • The three addition project will include a new laboratory, physician’s and specialty physician’s offices, a cancer and cardiac care, rehabilitation, and wellness center, an education center, a new critical care unit, pharmacy, outpatient care unit, single patient/family rooms, food service unit, and a high efficiency, green central energy plant. Centrally located in one of the most economically disadvantaged regions in Michigan (Kids Count 2008, Primary Hea5/1/2009

T O

Mecosta County Medical Center publicly owned nonprofit (owned by Mecosta County)

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

5/1/2011

$

55,613,500

5/1/2011

$

55,613,500

10/1/2009

$

6,000,000

N s

Big Rapids, Mecosta County

d e tt

Michigan Historic Preservation Network

Expected Completion Date

t i m

ub

Detroit

Vinton Building

t s e

qu

e R

The Vinton represents a public/private partnership to restore an historic 1927 Albert Khan building in downtown Detroit. Currently vacant and blighted, the 12-story building is being gut renovated into a walkable mixed-use development. The Vinton is located in the heart of downtown, 1 block from the River and Campus Martius Park and represents a highly visible building. The project is funded by numerous public and private sources including equity from private developers, the Detroit Economic Growth Authority, federal and state tax credits, a local CDC, and bank financing. The project will generate approximately 40 new permanent jobs through the creation of two new businesses (Tim Horton's and 313 Productions) and numerous temporary construction jobs. Green attributes include re-use of the existing Detroit infrastructure, preservation/refurbishment of the existing windows with high-efficiency glass, installation of high-efficiency furnaces on each floor, and elimination of blight on one o Detroit's most prominent corners. The project has private and public funding sources totaling approximately $5,000,000, but an additional $1,000,000 is needed to complete4/1/2009

S 02262009

Submitted Requests - Not Approved

944 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Michigan Historic Preservation Network

Detroit

The Whittier

Muskegon County Muskegon County Muskegon County

Dalton Township Muskegon City Muskegon City

Class A Roads Y Property Vets Center

Muskegon County

All Townships

Surveyor

The Whittier represents a public/private partnership to renovate a vacant historic resource along the East Riverfront in Detroit. The total project cost is $35,000,000, of which $10,000,000 of public funds and $17,000,000 of private funds have been committed. The remaining $8,000,000 is needed to complete this important project. The Whittier has been supported by the State in the form of the brownfield and historic tax credits as well as support from MSHDA, and by the City of Detroit which has provided HOME and PILOT funds and paid for improvements to the existing infrastructure. Further, the project will create 100+ temporary construction and 50+ new permanent jobs (new restaurant/catering business, property management), and will have several "green" attributes, including re-use of existing city infrastructure, replacement of all mechanical and HVAC systems with high-efficiency equipment, preservation/refurbishment of existing windows, and the placement of an easement on an adjacent property to provide for green space in perpetuity. In addition, the investment will return a vacant and blighted building to the city/state tax rolls. 6/1/2009 Upgrade Central/Tyler Road to Class A for Econ Dev in Business Park North Contract with General Motors Spring 2009 Purchase Waterfront Property/Clean up/recreation Spring 2009 Construct A Veteran Center/Clinic Spring 2009 Establishment of perpetuation of remonumentation PLS corners, installation of MCOR stations 3/1/2009

Community, County & Court Connectivity Initiative (4C's)

Scan records for each county office. Records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Objectives: ease of access, increased efficiency, improved image quality, for both public and staff.

Newaygo County

Expected Completion Date

PP

O R

Funding Request

D VE

6/1/2010

$

Summer 2009 Fall 2009 Fall 2010

$ $ $

12/9/2009

$

2/15/2009

8/15/2009

$

150,000

Scan all District Court records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. Objectives: ease of access, increased efficiency, improved image quality. 2/15/2009

8/15/2009

$

27,000

Court & Community Connectivity Initiative (CCCI)

Scan all Circuit Court records and documents to be used online by clients and staff. An online user friendly database will be developed to provide such services regardless of the user's location, including viewing court orders, filing court forms, submitting payment for fees and fines, and access to other informational documents. Court staff will begin the transition to paperless record retention. Judge will have the ability to view cases from the bench during hearings, cross referencing testimony with documents available for viewing. Objectives: ease of access, increased efficiency, improved image quality.

8/15/2009

Frankfort, MI

Medical Fitness Center

Enhancement of the current medcial fitness center through acquisition and renovation of neighboring building on the campus of the fitness center. A community kitchen for cooking demonstrations, nutritional counseling, wieght management classes and counseling can be held under one roof. 5/1/2009

9/1/2009

$

350,000

Muskegon

Muskegon

Installation of biomass fuel preparation system to reduce reliance on coal.

$

2,500,000

White Cloud, MI

A T

s

t s e

O N

Route (Infrastructure Only)

35,000,000 1,600,000 Central/Tyler 2,000,000 2,500,000 65,358 County

u q e

Newaygo County

R d

e t tt

White Cloud, MI

i m

Newaygo County

Paul Oliver Memorial Hospital S D Warren Renewable Fuel

b u S

White Cloud, MI

02262009

Submitted Requests - Not Approved

945 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Schoolcraft

Village of Schoolcraft

Village of Schoolcraft

Village of Schoolcraft

Village of Schoolcraft

39948

Project Name

Project Description

Ashery Dr. Water Main

39948

Schoolcraft Village

5 additional hydrants placements

39948

Schoolcraft Village

Redundant Water Main from Well House

39948

Grand Street Street Scape - Phase 2

39948

Grand Street Street Scape - Phase 3

Village of Schoolcraft

39948

Lyon Street

City of Alpena

City of Alpena

Bike Path Reconstruction and Resurfacing

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

Methane Gas Engine Replacement Energy Efficiency Upgrades - Street Light System Energy Efficiency Upgrades - Water system Meter Replacement

City of Alpena

City of Alpena

City of Mt. Pleasant

City of Alpena

Start Date

Schoolcraft Village

11/15/2009

Ashery Dr. Water Main

11/15/2009

5 additional hydrants placements

11/15/2009

s

O N

Schoolcraft Village Reconstruct sections of the16.45 mile bike path system and resurface others to improve accessibility and improve ride quality and use Replace the existing methane gas engine which uses byproduct methane to pump sewage through the plant

e u

st

PP

11/15/2010

Grand Street Street Scape Phase 3

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

02262009

Infrastructure Improvement/Green: Infrastructure Improvement/Green: WWTP Light Fixture Replacement

Center turn lane addition to Lyon Street east of 340,000 Grand Street

6/1/2009

9/1/2009

$

10/1/2009

$

1,250,000 1,750,000 City Wide

200,000 City Wide Water Recycling 30,000 Plant

10/1/2009

$

With recent implementation of a solids handling system at the water production plant, the discharge line to the sanitary sewer system from the plant is inadequate to handle the flow 6/1/2009

8/1/2009

$

Water Production 75,000 Plant

10/1/2009

$

Water Recycling 75,000 Plant

7/24/2009

$

400,000 Throughout city

9/11/2009

$

750,000 Throughout city

4/24/2009

$

15,000 Throughout city

5/15/2009

$

50,000 Throughout city

Install sidewalk in areas where there is a gap in the existing sidewalk infrastructure to promote walking and improve pedestrian safety. 4/13/2009

City of Mt. Pleasant

$

North end of Village - Streetscape 3,080,000 improvements

$

City of Mt. Pleasant

City of Mt. Pleasant

$

South end of Village Streetscape 710,000 improvements

9/1/2009

Infrastructure Improvement/Sustainability/Walkability: Sidewalk Installation

Infrastructure Improvement/Sustainability/Walkability: Sidewalk Replacement

$

Redundant Water Main from Well 90,000 House

6/1/2009

Sludge Hauling Tanker Replacement

b u S

$

Add additional fire hydrants at 5 location ($2,500 15,000 /ea)

$

City of Alpena

i m

$

Ashery Drive – Replace 920 L.F. of 4” water main with 920 L.F. of 8” water 90,000 main.

Lyon Street

The tanker trailer is a 1982 model. The tanker has had welding done to repair stress fractures in the support ribs for the tank during the 1999 overhaul. This is a good indication that the metal may be getting fatigued. 7/1/2009

e t tt

Route (Infrastructure Only)

11/15/2009

R d

Water Production Plant Sanitary Discharge Improvements

Redundant Water Main from Well House

11/15/2009

Install LED lighting fixtures as replacements for all of the City owned lighting elements 7/1/2009 Install new remote read meters and Wi-Fi interrogation system city wide to increase accuracy of the meters 7/1/2009

eq

O R

Funding Request

D VE

Grand Street Street Scape Phase 2

A T

Schoolcraft Village

Schoolcraft Village

Expected Completion Date

Replace sidewalk in areas where the existing sidewalk is in deteriorated condition, to promote walking and improve pedestrian safety by minimizing the potential for trip and fall accidents. Install new handicap ramps that meet the current ADA requirements. This will improve accessability for disabled pedestrians by making the handicap ramps in the sidewalk system consistent throughout the city. 4/13/2009 Replace the existing high pressure sodium and metal halide lights in the water treatment building with mercury-free LED lights. 3/23/2009 Replace existing lights with mercury-free LED lights and motion sensing equipment, reducing energy consumption and lowering carbon footprint. 3/23/2009

Submitted Requests - Not Approved

946 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

Project Name

Project Description

Start Date

Expected Completion Date

Infrastructure/Walkability: Preston Street Widening

Widen Preston at Mission to improve traffic flow and improve pedestrian safety, as well as provide sewer service and improved accessability to facilitate a $3+ million private development.

Infrastructure Rehabilitation: Sanitary Sewer Relining

Reline failing sanitary sewers throughout the city's sewer system to eliminate sewer backups caused by collapsed sewers. This will also reduce infiltration into the system, which will minimize the impact on the environment by minimizing the amount of sewage needing treatment. 3/23/2009

4/13/2009

7/13/2009

11/30/2009

Funding Request

$

D VE

Route (Infrastructure Only)

Streets: Preston and Mission Road 200,000 (Business US127)

$

2,500,000 Throughout city

11/30/2009

$

200,000 Throughout city

O R

City of Mt. Pleasant

City of Mt. Pleasant

Infrastructure Rehabilitation: Sanitary Sewer Manholes

Rehabilitate failing sanitary sewer manholes throughout the city's sewer system to eliminate sewer backups caused by collapsed sewer manholes. This will also reduce infiltration into the system, which will minimize the impact on the environment by minimizing the amount of sewage needing treatment. 3/23/2009

City of Mt. Pleasant

City of Mt. Pleasant

Infrastructure Improvement: Sanitary Sewer Monitoring

Televise existing sanitary sewers throughout the city's sewer system to identify and repair deteriorated sewers before they collapse and cause backups.

3/23/2009

6/12/2009

$

100,000 Throughout city

Infrastructure Improvement/Green: Island Park Improvements

Complete Island Park Drive South; replace water main; reconstruct tennis courts; install tennis and ball diamond fencing; replace park shelter; construct sports courtyard.

5/11/2009

9/18/2009

$

615,000 Island Park

City of Mt. Pleasant

Village of Schoolcraft

Village of Schoolcraft

City of Mt. Pleasant

39948

Eliza Street Safety Improvements

39948

Sidewalk Replacement (Village wide)

Brigeton Township

5631 South River Drive, Grant Michigan, Bridgeton Township, Newaygo County, Michigan Bridgeton Community Park

City of Ferrysburg

Ferrysburg City

Fourth Street Project

City of Ferrysburg

Ferrysburg City

Parkwood Drive

City of Ferrysburg

Ferrysburg City

North Shore Road project

City of Ferrysburg

Ferrysburg City

City of Ferrysburg

City of Ferrysburg

Ferrysburg City

02262009

Schoolcraft Village

Schoolcraft Village

s t s

-N

e u

11/15/2009

Eliza Street Safety Improvements $

Upgrade roadway for safety, wide roadway and add 220,000 guardrail.

11/15/2009

Sidewalk Replacement (Village wide)

$

Village wide 324,000 conductivity

10/9/2009

$

175,000

6/30/2009

$

Bridgeton Community Park Development project will provide for public recreational usage and access to the Muskegon RIver and the enjoyment of natural features including ADA nature trails, river-overlook and picnic & playground areas. Focus is on environmental-friendly sustainable & "greening" features that incorporate recycled materials-usage, open space preservation, solar-powered structures, natural raingardens/retention sites and non-toxic/natural composting restroom facilities. 4/1/2009 Reconstruct street corridor to provide vehicular and pedestrian access to a defined waterfront boardwalk. 5/1/2009

q e R

Reconstruct, storm drain improvements, sanitary sewer upgrade, streetscape

5/1/2009

9/30/2009

$

Pine to street to 140,000 watersedge North Shore Road 700,000 to Mohawk

Rubblize, resurface, curb, gutter, storm drain improvements, non-motorized path, streetscape

5/1/2009

9/30/2009

$

North Shore Drive 3,000,000 to 174th Avenue

Construct new energy efficient DPW garage with salt barn. Site plan reviewed by Department of Public Works Garage/Salt Barn Planning Commission, approved by City Council. Property is City-owned.

5/1/2009

11/1/2009

$

1,750,000

d e tt

it

m b u

S

Ferrysburg City

T O

P P A

168th Avenue

Reconstruct, storm drain improvements, non-motorized bike path, streetscape

5/1/2009

9/30/2009

$

West Spring Lake Road to 1,750,000 VanWagoner Road

City Hall Project

Construct new energy efficient LEED designed City Hall, renovate existing school structure. The gymnasium would be used for community events. The site would also contain areas for public gatherings, e.g. farmers market, concerts, ice rink. Site plan reviewed by Planning Commission, approved by City Council. Property is City-owned 3/1/2009

10/1/2009

$

5,000,000

Submitted Requests - Not Approved

947 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Fremont

City of Fremont

City of Fremont

City of Fremont

City of Marine City

City of Marine City

City of White Cloud

Clio Area Schools

Clio Area Schools

Project Name

Project Description

Start Date

Expected Completion Date

The funds will be used to enhance the Police Outdoor Shooting/Practice Range, which serves all county, state and federal law enforcement agencies. Specifically, the funds will be used to remove and recycle over 25 years of lead ammunition from the shooting range berms and to make improvements for safety enhancements. 4/1/2009

Fremont City

Fremont Police Outdoor Shooting/Practice Range Enhancements (Police)

Fremont City

In order to spur on regional tourism, Fremont is creating a public art public walking tour as part of an economic development strategy. In keeping with the City's Art Fremont Public Art Walking Tour Art Projects Placement Plan, funding will be used to create public art for the tour on the Fremont (Economic Development) Cooperative's Main building (mural) and in Veterans' Memorial Park (sculpture).

10/1/2009

P P A

D VE $

75,000

$

75,000

10/1/2010

$

115,000

O R

3/1/2009

Funding Request

10/1/2009

Fremont City

Fremont Streetscape/Signage Project (Economic Development)

In accordance with the Downtown Fremont Marketing Plan, the City wants to create the "WOW" factor to encourage visitors to come to Fremont to enjoy all it has to offer. In order to create the "WOW" factor, streetscape and signage improvements are proposed. Improvements to be funded include community event signs, a City Hall information sign, landscaping, flowers, etc. 4/1/2009

Fremont City

Fremont - Town & Country Path Phase 2b Construction (Environment, Recreation and Green)

Fremont's Joint Parks & Recreation Plan identifies the need for many phases for the development of the Town & Country Path. The funds will be used to construct Phase 2b of the Town & Country Path from Main Street to Pathfinder School. The Path is one way Fremont supports creating healthy communities. 4/1/2009

6/1/2010

$

175,000

Historic Light House Restoration & Sea-wall Repair

This project would restore the 1908 Peche Island Lighthouse located in Marine City to a level allowing limited public access. In addition it would provide sea wall repairs in the park located around the lighthouse on the St Clair River reducing shore line erosion. 5/15/2009

6/30/2009

$

95,500

Waste Water Plant & Pumping Station

This project would fulfill a DEQ requirement for waste water plant operators to provide emergency back-up power for waste water plants and remote pumping stations. The scope of this project would provide a back-up generator at the Marine City Waste Water Plant and a critical remote pumping station. 4/15/2009

6/15/2009

$

293,000

The White Cloud City Industrial Park needs to add a loop to the water line that serves the park. This is necessary to add redundancy in the event that there would be a disruption in the current line due to a break or other cause. This redundant line would also add to the marketability of the park for future tenants. 5/1/2009

10/1/2009

$

1,000,000

Service Center

Purchase of a generator(s) capable of maintaining power at Clio Area High School in case of district or community emergencies. Local emergency plans call for use of the schools as staging areas for citizens who are not able to return to their homes. Emergency power would be necessary to maintain essential services to the community. The high school would be able to provide a heated environment, food services, and housing accomodations. Generators are manufactured in Michigan this would support Michigan jobs. This request would be for the use of Vienna Township, City of Clio, Thetford Township, and Clio Area Schools. 3/1/2009

6/1/2009

$

30,000

Clio High School

Science Laboratory Improvements at Clio High School to accommodate current technology and college requirements. Science Laboratory installation at Mott Community College (Northern Tier Campus, Clio). Mott CC and Clio Area Schools need the improvements support our efforts as we work collaboratively in health education projects.

1/31/2010

$

500,000

Marine City, MI

Marine City, MI

White Cloud City

White Cloud City Industrial Water Loop

d e tt

ub

Vienna Township

S

Vienna Township

02262009

t i m

T O

N s

t s e

qu

e R

Submitted Requests - Not Approved

7/1/2009

Route (Infrastructure Only)

948 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Croton Township

Intermediary BioChemicals

LCEDC

Croton Twp, Big Prairie Twp

East Lansing, MI

Village of Baldwin

Merrill Township

Newaygo County

Bitely/Merrill Township

Project Description

Start Date

The Dam Trail / Croton Twp Campground

Croton & Big Prairie Twps have 2 dams located 6.5 miles apart. The Townships would like to connect the two by a non-motorized path that is 13 miles long, 8ft wide and loops around the dams. The Townships wish to promote increased health while experiencing the beauty of the area. The plan is to eventually expand this trailway by connecting to the Newaygo Community Recreation Authority trail system located in Brooks Twp, Garfield Twp, and Newaygo City. Along the trail is located a 40 year old campground that is in desperate need of modernizing. Amenities need to be made handicap accessible and the roads and trails need paving to prevent future erosion and other effects to adjacent waterways. 4/20/2009

Development of Renewable, Green Technology for Manufacture of Pharmaceutical and Food Chemicals in Michigan

Introduction and mission. Rising and volatile feedstock and energy prices combined with industry consolidation pressures have increased petroleum-based chemical production costs by >200% in the past 5 years. Additionally, these facilities and processes must now address their generation of millions of tons of greenhouse gases and chemical waste annually. Intermediary Biochemicals, Inc. (IBC), was formed in 2007 to adapt its patented microbial and biochemical technologies into systems to cost effectively produce intermediate ($1-$1000 per kg) and fine (>$1000 per kg) chemicals from renewable feedstocks using environmentally responsible processes. Market Problem. Oil prices have become extremely volatile and have hit record highs in 2008 ($50/bbl to >$140/bbl). Global demand pressures such as robust growth of China and India combined with geopolitical tension in the Middle East argue for continued volatile, high petroleum prices. Additionally, societies recognize that the total burden of chemical processing includes waste remediation and pollution mitigation. The growing efforts to reverse the long term climatic impact of our reliance

Public Works/County Maint. Building

Construction of a 48 x 120 ft. pole building to be used for the County Maint. Bldg. to handle all maint. Issues for all county vehicles, office space, and an investigative impound lot for County Police Services

e t tt

i m

Brownfield Assessment

T O

N s

t s e

O R 4/20/2010

Funding Request

$

1,900,000

2 years from start

$

2,500,000

P P A

2009

$

425,000

2009

8/10/2009

$

200,000

Newaygo County has applied for funding through the EPA Brownfields program to assess and inventory brownfield properties.The Newaygo County Brownfield Authority established in 2007, has received a $100,000 startup grant from a local community foundation. With this grant, the Authority has developed a county-wide brownfield plan to guide future redevelopment projects, supplied funding to perform Phase I and II environmental assessments and write a Baseline Environmental Assessment and brownfield plan for a pilot project in the City of Newaygo, which is able to be recouped through tax increment financing, and put the small amount of remaining moneys into a local site remediation revolving fund. With a $200,000 EPA grant for hazardous materials contaminated sites and a $200,000 grant for petroleum contaminated sites, the Brownfield Redevelopment Authority would be able to target an additional 12 sites for redevelopment. This would provide environmental remediation, stimulate economic development, protect existing greenspaces in the county, and limit urban sprawl, as well as removing some environmental cleanup burdens from the Michigan DImmediately

12/1/2010

$

400,000

u q e

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

We currently have a large Community building with major needs for enhancements, weatherization. We are looking to replace roof with metal (currently old shingleleaking) Desperate in need of efficient furnace, hoping to install geothermal, solar panels and a wind generator. We need to have more insulation. We would like to use our community for local projects, meetings and communication, senior citizen services etc 5/9/2009

R d

Merrill twp Green Project

b u S

Newaygo County, Michigan - Specifically Fremont, Grant, Newaygo, White Cloud, and Hesperia, Michigan

02262009

Project Name

Expected Completion Date

949 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County

Newaygo County

Newaygo County Northville Township

City of Newaygo, Newaygo County

Big Prairie Township, Newaygo County

Project Name

Project Description

Start Date

Expected Completion Date

Henning County Park Road Repair

In addittion to a variety of recreational facilities, this park provides rear round boating access to the Muskegon River. It receives extensive use by the general public, liveries, and commercial fishing guides. The roads asphalt surface is over 35 years old and requires an asphalt overlay to protect it from further deterioration. Project would provide an asphalt overlay on 17,000 square yards of road and parking lot. 4/1/2009

Hardy Dam County Marina Improvement

Hardy Dam Marina provides a regional public boat slip and launching facility for boaters on 4,000 acre Hardy Pond. The existing slips were inadequate to meet the needs of current boaters and a new design was engineered. $240,000 was invested in new toilet facilities and replacing 24 slips and walkways. The remaining 16 slips are unsafe for continued use and require imediate replacement (150,000). The plan also includes electric service to 40 boat slips (100,000). 4/1/2009

D VE $

114,000

11/1/2009

$

250,000

9/30/2009

$

30,000

9/1/2009

$

266,900

Manufacturing Energy Conservation Technology Sidewalk Replacement (Village wide) Lyon Street Grand Street Street Scape - Phase 2 Grand Street Street Scape - Phase 3 Washington St Force Main Storm Sewer Mapping, Cleaning & Video V Ave. Force Main

Manufacturing is responsible for in excess of 32% of the carbon emission and 82% 0f solid waste generation. Yet manufacturing is critical for economic well being and employment of the middle class of this country and especially for the state of Michigan. According to department of Commerce, almost 86% of goods and products generated in USA is impacted by tools and dies, which mostly housed in Michigan and few adjoining states. Manufacturing Energy Diminution Technology (MEDT) will develop critical technologies to rapidly and directly build functional metal parts, tooling and dies with design functionality to reduce energy consumption during manufacturing of components and thus carbon foot print. Additionally, MEDT will result in significant amounts of energy reduction through the remanufacturing process of tools utilized to create the parts themselves. The proposed new process will replace many steps and complex processes in traditional tooling and die manufacturing. It offers the advantage of greatly reducing the time to produce complex tooling and dies with ultra high precision, while simultaneously achieving superior tool life and productivity. In ad May 1,2009 Village wide conductivity 5/15/2009 Center turn lane addition to Lyon Street east of Grand Stree 5/15/2009 South end of Village - Streetscape improvements 5/15/2009 North end of Village - Streetscape improvements 5/15/2009 Washington Street Force Main 5/15/2009 Storm Water Mapping, Evaluating System along with Cleaning and Video 5/15/2009 V Avenue Force Main 5/15/2009

April 30,2114 11/15/2009 11/15/2009 11/15/2009 11/15/2010 11/15/2009 11/15/2009 11/15/2009

$ $ $ $ $ $ $ $

25,000,000 324,000 340,000 710,000 3,080,000 150,000 200,000 330,000

River Street Sidewalk

400 feet of sidewalk

5/9/2009

5/9/2009

$

Holmes School to 12,000 River Street

Lakeside Trail Gap Completion

Completion of 12 mile loop around Spring Lake

5/9/2009

8/9/2009

$

From Cutler to 917 450,000 West Savadge

O R

P P A

Lilly Township, Newaygo Day use and boat launching activity at Pettibone Lake has grown to the point that the County Pettibone Lake County Park Improvement site requires expanded parking lot development (20,000), with a vault toilet (10,000). 4/1/2009 Main Street Sanitary Sewer Extension (East of Beck) Extending 1200 ft of sanitary sewer to an area of potential and failing septics. 6/1/2009 Section 4 Northville

T O

4/30/2009

Funding Request

Route (Infrastructure Only)

N s

t s e

POM Group Schoolcraft Village Schoolcraft Village Schoolcraft Village Schoolcraft Village Vicksburg Village Vicksburg Village Vicksburg Village

Auburn Hills, MI Schoolcraft Village Schoolcraft Village Schoolcraft Village Schoolcraft Village Vicksburg Vicksburg Vicksburg

u q e

R d

Village of Spring Lake Spring Lake Village

i m

ub

Village of Spring Lake Spring Lake Village

S

e t tt

Webber Township Whiteford Township City of Grand Haven City of Marysville City of Marysville

M-37, North of 24th Street Webber Twp. Lake Co. Whiteford Township Grand Haven City Marysville Marysville

WT / Lake County park Ottawa Lake Sewer System Pump Station Rebuild M-29 Watermain Replacement St. James Watermain

install infrastructure within park, sewer, water, electric and pave road and parking. Demo and reconstruct 4-H building at same location Sewer System for a town Sewer lift station replacement replace approximately 3400 feet of existing 16-inch watermain replace 1700 feet of existing 8-inch watermain

3/1/2009 5/9/2009 Summer 2009 3/9/2009 3/9/2009

11/30/2009 11/9/2009 2009 6/9/2009 6/9/2009

$ $ $ $ $

300,000 2,500,000 150,000 520,000 250,000

City of Negaunee

City of Negaunee

Copper St Sanitary Sewer Replacement

Replacement of sanitary sewer to remove I/I and allow for future development.

5/1/2009

9/15/2009

$

250,000

02262009

Submitted Requests - Not Approved

950 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Negaunee Clinton Township

Macomb County Madison Township Madison Township Madison Township Madison Township Madison Township Madison Township Madison Township Muskegon County USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial USS Edson DD-946 Naval Memorial

City of Negaunee Clinton Township

43565 Elizabeth St., Mt. Clemens, MI 48043 Madison Township, Lenawee County Madison Township, Lenawee County Madison Township, Lenawee County Madison Township, Lenawee County Madison Township, Lenawee County Madison Township, Lenawee County Madison Township, Lenawee County Muskegon City

Project Name Rolling Mill Sewage Disposal System Improvements Road

Start Date

9/15/2009 11/15/2009

Funding Request

Replacment to existing sewage system that has failed. Pennington Road

5/1/2009 6/9/2009

Installation of Lift Station at the Macomb County Jail

Emergency overflow of the sewer system - Jail. Safely diverts raw sewage from Macomb County Jail in case of breakdown of forced sanitary main or pumps.

Commence the bid process within 90 days after receipt of 8 months after approval of commencement of funding construction $

Demolish 2 Houses

Demolish 2 Houses that are currently on Township Property

6/1/2009

2 New Water Wells

Two new Water Wells to provide a reliable back-up to our current system

Repave Township Parking Lot

Grade and Repave the Township Complex parking lot

Pave Bailey Hwy

Pava Bailey Hwy from West Gier to W Carleton Rd

Water Line on Carleton Road to M-52

Add water line to existing system to complete loop from Treat Hwy to M-52.

Pave Porter Hwy

O R

350,000 700,000 Local

D VE

55,000 7,000

8/1/2009

$

75,000

6/1/2009

9/1/2009

$

100,000

8/1/2009

11/1/2009

$

330,000

5/1/2009

8/1/2009

$

650,000

8/1/2009

11/1/2009

$

660,000

Sewer Line West on Carleton Road to M-52 Mental Health Building

Pave Porter Hwy from West Carleton to M-34 Add sewer line from existing system to extend from Treat Hwy to M-52 North to US 223. Build new 38,000 square foot Community Mental Health Building

6/1/2009 Immediate

9/1/2009 11/9/2009

$ $

1,000,000 6,150,000 NA

Bangor Township

USS Edson DD-946 Naval Memorial

Transformer for ship power

5/1/2009

6/1/2009

$

2,300

Bangor Township

USS Edson DD-946 Naval Memorial

Install water line to museum site

5/1/2009

6/1/2009

$

7,500

Bangor Township

USS Edson DD-946 Naval Memorial

Landscaping of museum site

5/1/2009

6/1/2009

$

10,000

Bangor Township

USS Edson DD-946 Naval Memorial

Ticket office building

5/1/2009

6/1/2009

$

12,000

Bangor Township

USS Edson DD-946 Naval Memorial

Mooring Ballards (shore)

5/1/2009

6/1/2009

$

17,619

Bangor Township

USS Edson DD-946 Naval Memorial

Install sewer line from main line to ship mooring site

5/1/2009

6/1/2009

$

21,800

Bangor Township

USS Edson DD-946 Naval Memorial

Parking lot lighting

6/1/2009

7/1/2009

$

35,000

Bangor Township

USS Edson DD-946 Naval Memorial

Mooring Dolphins (in water)

5/1/2009

6/1/2009

$

42,488

Parking lot paving

5/1/2009

6/1/2009

$

75,000

10/9/2009

$

205,000

m b u

Bangor Township

USS Edson DD-946 Naval Memorial

10183 S Warner Ave, Grant Michigan, Bridgeton Township, Newaygo County, Michigan Community Technology Implementation

02262009

-N

e u

eq

R d

e t t

it

s t s

T O

P P A 5/1/2009

Community Technology Implementation Plan provides immediate broadband/satellite access for the municipal government offices. For the community, a public computer lab and a wireless-café setting provide internet services as well. In all, the project creates efficiency for governmental functionality, e-commerce opportunities for citizens, as well as economic improvement/impact for home based & local /retail businesses. Further, it provides access to online-education opportunities, re-training services for senior citizens and displaced workers, opportunities for upgrading technology skills with accredited and continuing education courses, and access to online job-bank. Each of which, provide the tools necessary to maintain a viable workforce and to expand employment opportunities while reducing the carbon-foot print of travel. 3/1/2009

Submitted Requests - Not Approved

9/1/2009

$ $

Route (Infrastructure Only)

$

S Brigeton Township

Project Description

Expected Completion Date

951 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alpena

City of Alpena

City of Alpena

City of Alpena

City of Alpena

Project Name

Project Description

Miller Street resurfacing

Mill existing surface, repair curb and gutter, adjust valves and manholes and overlay with 2" of bituminous material length 2,400 ' or 0.45 miles 5/1/2009

Third Avenue resurfacing

Mill existing surface, repair curb and gutter, adjust valves and manholes and overlay with 2" of bituminous material length 1,430 ' or 0.27 miles 5/1/2009

Cavanaugh Street resurfacing

Mill existing surface, repair curb and gutter, adjust valves and manholes and overlay with 2" of bituminous material length 1,000 ' or 0.19 miles

City of Alpena

City of Alpena

Traffic Signal Controller Replacement

City of Alpena

City of Alpena

Circuit Breaker Upgrade and rebuild

Replace 4 traffic signal controllers which have not been upgraded to electronic controls Rebuild and or Replace the existing 30+ year old circuit breakers to electronic breakers with improved reliability

City of Alpena City of Alpena

City of Alpena City of Alpena

Water Main Valve replacement and Insertion City Wide Resurfacing

City of Alpena

City of Alpena

Wessel Road Truck Access resurfacing

City of Alpena

City of Alpena

Fiber Optic Backbone Construction

City of Cedar Springs

Start Date

The City of Cedar Springs/Nelson Township Fifth Street Resurfacing

T O

-N

e u

$

7/1/2009 9/1/2009

$ $

250,000 City Wide 280,000 City Wide

9/1/2009

$

260,000 Wessel Road

9/1/2009

$

250,000 City Wide

90 days after startup

$

63,000

When funding becomes available.

City of Coloma

South Church Street Water Main upgrade from St. Joseph Street to Ryno Road and Ryno Road Water Main upgrades from South Upgrade water main size from 6" main to a 12" main to serve commercial corridor Church Street to East City Limits along Red Arrow Highway and I-94 Highway in Coloma Township.

City of Mt. Pleasant

City of Mt. Pleasant

u S

City of St. Clair Shores St. Clair Shores

bm

Infrastructure Improvement/Green: Ranney Well Upgrade

Gordon Road Reconstruction (CDBG)

City of St. Clair Shores St. Clair Shores

Florence Road Reconstruction (CDBG)

City of St. Clair Shores St. Clair Shores

Gladstone Road Reconstruction (CDBG)

City of St. Clair Shores St. Clair Shores

Roy Road Reconstruction (CDBG)

02262009

Microsurfacing Pavement for Lake Street & Third Street

9/1/2009

$

200,000

8/1/2009

$

90,000

6/1/2009

9/1/2009

$

224,000

5/1/2009

9/30/2009

$

150,000

5/15/2009

$

30,000

5/1/2009

10/1/2009

$

5/1/2009

10/1/2009

$

5/1/2009

10/1/2009

$

5/1/2009

10/1/2009

$

Replace the original (1964) electrical controls for the Ranney Collector Well, which is the main water source for the city, with new energy eficient controls. 3/23/2009 Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area. Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area. Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area. Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area.

Submitted Requests - Not Approved

Ripley Boulevard, North second Avenue, Bagley 14,000 Street Water Recycling 50,000 Plant

8/1/2009

City of Coloma

it

$

Cavanaugh Street from M-32 to 30,000 Eighth Avenue

6/1/2009

City of Coloma

Lake Street Microsurfacing

$

Third Avenue from Garden Street to 106,200 Bagley Street

D VE $

City of Coloma

City of Harbor Springs City of Harbor Springs

$

Miller Street from North Second Avenue to Beech 142,500 Street

7/1/2009

City of Coloma

d e tt

Funding Request

Route (Infrastructure Only)

5/1/2009

Upgrade water main size from 6" main to a 12" main to serve commercial corridor East St. Joseph Street Water Main upgrade along Red Arrow Highway in Coloma Township and a proposed residential from South Church Street to Sassafras Street development. 6/1/2009 Garfield Water Main replacement from Banks Upgrade water main size from 4" main to a 8" main to serve residential lots in the City Street to Sassafras Street of Coloma. 6/1/2009

City of Coloma

6/1/2009

P P A

Mill and resurface Fifth Street and parking lot between Cherry and Muskegon.

q e R

6/1/2009

O R

The City has a listing of approximately 65 inoperable or broken valves that need to be replaced along with inserting new valves at strategic locations to reduce shut down areas and impact to customers 5/1/2009 Resurface 40 blocks of street as identified in our annual program 6/1/2009 Overlay Wessel Road to reduce the rutting and premature failure of the industrial access route 6/1/2009 Install continuations of existing fiber optic cabling to loop the system providing redundancy and reliability of service 6/1/2009

s t s

Expected Completion Date

Gordon St- Harper 324,000 to Florence Florence St- 11 810,000 Mile to Martin Gladstone St- 11 810,000 Mile to Martin Roy St- 11 Mile to 810,000 Martin

952 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Marine City

City of Marine City

Marine City, MI

Marine City, MI

Project Name

Project Description

Start Date

Expected Completion Date

Degurse / Ward Street Rebuild

Degurse – King Road to Belle River Ave: Existing concrete pavement needs sealing, mud jacking of settled panels, diamond grinding, replacement of cracked panels and curb, minor storm sewer work on east end (needs to be televised) Ward Street – King to Parker: Existing concrete pavement needs sealing, mud jacking of settled panels, diamond grinding, replacement of cracked panels and curb, minor storm sewer work on east end (needs to be televised) 6/1/2009

N. Belle River /Main Street / West Blvd

North Belle River Avenue – Degurse to West Blvd: Total reconstruct. Add curb and gutter, storm. Replace sanitary and water. Main Street – Broadway to Bridge Street: Total reconstruct. Replace sanitary, storm, water S. Belle River Avenue & Alger Street – Parker to Brown Street: Total reconstruct. Add curb and gutter. Replace water and storm sewer. Sanitary is ok. West Blvd – Parker Street to South Belle River Avenue: Total reconstruct. Replace water main. Investigate sanitary and storm for possible replacement. 6/1/2009

D VE $

260,000

9/15/2009

$

2,725,000

11/15/2009

$

6,504,000

12/10/2009

$

SWEEP, established in 1998, focuses on low-income, non-traditional (working adult), minority (principally African American and Latina) women who, for economic, geographic, or other reasons, have been unable to pursue a college degree. For these under-represented groups, income and race are significantly associated with lower rates of degree achievement on a national basis. With an annual enrollment of 45-50 students, the SWEEP program offers classes at convenient times (primarily evening classes) right in the neighborhood, alleviating transportation issues. The SWEEP program offers students enhanced support services to ease the transition from home or work to college and degree achievement, thereby helping these women improve quality of life for themselves and their families. SWEEP students develop tremendous bonds, helping each other with child care, transportation, mentoring and tutoring exercises. The SWEEP location has one 15-station computer lab/classroom, which serves as a "smart classroom," the writing lab, the career services lab, the access point to online information, and online contact with the main campus staff locat7/1/2009

6/1/2011

$

410,120

We currently only have dial up available for everyone. It is almost impossible to take care of daily functions through the township. Our businesses are also suffering.

12/9/2009

$

150,000

7/1/2009

$

10,320

City of Marine City

Marine City, MI

Marine City King Road Extension

City of Port Huron

City

21st Street Phase I

Combined Sewer Overflow Control Project replace sewers, and water mains

s t s

O R

P P A

King Road Extension: Total construction - curb and gutter, sidewalks, storm, sanitary and water. This project opens up the south end of Marine City for development of a St Clair County Industrial Park by providing access to almost 400 acres of property with access to city water and sewer and other private utilities. Project would also provide a save-way to local elementary, middle, and high school students. 6/1/2009

T O

9/15/2009

Funding Request

-N

4/1/2009

Route (Infrastructure Only)

Various local 17,431,049 streets

e u

d e tt

Madonna University

Southwest Detroit/Wayne SWEEP (Southwest [Detroit] Women’s County, MI Educational Empowerment Project)

Merrill Township

Bitely/Merrill Township

Newaygo County

02262009

m b u

S

White Cloud City

it

Merrill Twp Internet

EOC Funature and Office Supplies

q e R

6/9/2009

Funding was recently provided for upgrades to the Newaygo County Emergency Operations Center out of the FY 2006 Homeland Security Grant for communications equipment, data displays, and cyber security for the Emergency Operations Center Network. However, the funding did not allow for Tables, Chairs, EOC Go-Kits, Supply Package, and Copy Machine. This project would provide need equipment for the Newaygo County Emergency Operations Center that was not eligible under other funding sources. 4/1/2009

Submitted Requests - Not Approved

953 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County

Newaygo County

Newaygo County

White Cloud City

Project Name

Newaygo County Shelter Supplies

EOC/Sheriff Department Generator

Newaygo County recognizes a fully capable emergency operations center facility is an essential element of a comprehensive emergency management system and is necessary to ensuring continuity of operations and continuity of government in a majo disaster. With Newaygo County touching 8 out of the 13 Counties in Region 6, it makes the County EOC an ideal location for a Regional Coordination Center during incidents impacting multiple Counties within the Region. This project investment would make the Newaygo County Emergency Operations Center sustainable, secure, and more efficient by installing a generator with an automatic transfer switch, installing a card swipe access security system, and creating a separate conference room within the EOC. The generator will provide the EOC Building with a stable, self-sufficient power source allowing the EOC to maintain its operational integrity during power outages. The card swipe access security system will enhance the physical security measures making the EOC and the EOC Communications Room safe and secure by adding three readers on the exterior and interior EOC doors and the EOC Communica4/1/2009 Mobile and portable radios, pagers, and dispatch equipment upgrades to be narrow band compliant for emergency first responders, schools, and department of public works agencies across the county Add additional fire hydrants at 5 location ($2,500 /ea

Newaygo County Schoolcraft Village

Newaygo County Narrow Banding 5 additional hydrants placements

Schoolcraft Village Schoolcraft Village Schoolcraft Village

Schoolcraft Village Schoolcraft Village Schoolcraft Village

Ashery Dr. Water Main Redundant Water Main from Well House Eliza Street Safety Improvements

Vicksburg Village

Vicksburg

Lee Ave. & E. Highway St. Water Main

Vicksburg Village

Vicksburg

N. Richardson Ave. Water Main

Vicksburg Village

Vicksburg

South Mills Water Main

Vicksburg Village

Vicksburg

E. Prairie St. Water Main

Vicksburg Village

Vicksburg

East of N. Boulevard St. Water Main

Vicksburg Village

Vicksburg

Vicksburg

Vicksburg Village

Vicksburg

Vicksburg Village

Vicksburg

Vicksburg Village

Vicksburg

02262009

tt i m

d e t

ub

22nd Street Water Main

S

Start Date

The Muskegon, Oceana, Newaygo Chapter of the American Red Cross serves Newaygo County. During times of emergencies, when Newaygo County needs to establish a shelter to provide food, clothing, and shelter services to residences, all equipment and volunteers come from Muskegon County. Because the chapter serves three counties, their resources are split in half if multiple shelters are opened. The American Red Cross would like to establish shelter supplies including Cots, Blankets, Disaster Health Service Kits, Comfort Kits, and food clean up kits within Newaygo County. 3/1/2009

Newaygo County Schoolcraft Village

Vicksburg Village

Project Description

T O

s t s

-N

e u

Place a 12-inch water main in 22nd Street from the 12-inch water main at Lotus Lilly Avenue to the 12-inch water main located north of Parkhurst Lane.

56,520

8/1/2009

$

66,073

5/1/2009 5/15/2009

12/1/2009 11/15/2009

$ $

200,000 15,000

5/15/2009 5/15/2009 5/15/2009

11/15/2009 11/15/2009 11/15/2009

$ $ $

90,000 90,000 220,000

5/15/2009

11/15/2009

$

9,360

5/15/2009

11/15/2009

$

28,080

5/15/2009

11/15/2009

$

33,696

5/15/2009

11/15/2009

$

78,624

5/15/2009

11/15/2009

$

131,040

5/15/2009

11/15/2009

$

148,512

11/15/2009

$

152,880

11/15/2009

$

164,268

11/15/2009

$

247,104

11/15/2009

$

258,336

N. Boulevard St. Water Main

Maple Meadows Ave. Water Main

Replace the 8-inch water main in Maple Meadows Avenue, west of Vicker Street with a 12” water main and extend this 12-inch water main northwesterly and connect to the 12” water main in “V” Avenue. 5/15/2009

Submitted Requests - Not Approved

D VE $

Replace the existing 8-inch main in Vicker Street with a 12-inch water main and place a 12-inch water main on the north side of “V” Avenue from Vicker Street to Trillum Boulevard. 5/15/2009 Replace the existing 4-inch main in West Vine, North Michigan Avenue and Bowie with 8-inch water main. 5/15/2009 Replace the existing 6-inch main on N. Boulevard Street from McKain to West Prairie Street with a 12-inch water main. 5/15/2009

Vicker St. & "V" Ave. Water main W. Vine, N. Michigan Ave. & Bowie Water Main

8/1/2009

Funding Request

O R

Route (Infrastructure Only)

P P A

Ashery Drive – Replace 920 L.F. of 4” water main with 920 L.F. of 8” water main. Redundant Water Main from Well House Upgrade roadway for safety, wide roadway and add guardrail Connect the 12-inch water main to the 8-inch water main at the intersection of Lee Avenue and East Highway Street with a 12-inch water main. Replace the existing 6-inch main on North Richardson Avenue from East Vine Street to the Railroad Tracks with an 8-inch water main. Replace the existing 4-inch main on South Mills, north of West Prairie with an 8-inch main. Replace the existing 8-inch main on East Prairie Street from North Main Street to North Kalamazoo Street with a 12-inch water main. Replace the existing 8-inch main east of N. Boulevard Street from Briggs Street to West Washington Street with a 12-inch water main.

q e R

Expected Completion Date

954 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Vicksburg Village

Vicksburg

Project Name

Project Description Start Date Replace the existing 6-inch main on N. Main Street from Prairie to North Street with 12 inch main. 5/15/2009

Expected Completion Date

N. Main St. Water Main

11/15/2009

Village of Spring Lake Spring Lake Village

Downtown Parking Lots

Three public parking lots

May, 2009

6/9/2009

Village of Spring Lake Spring Lake Village

Meridian Sewer Line

100 year old sewer line has major infiltration/leakage issues

4/9/2009

5/9/2009

Village of Spring Lake Spring Lake Village

Tanglefoot Park Docks

10 floating docks plus several transient docks

Village of Spring Lake Spring Lake Village Whiteford Township Whiteford Township

Meridian Water line Water System

Undersized 4 inch line needs upgrade for fire flow Water line, see attached letter

Brigeton Township

Independence Township Blue Lake Township

Michigan Council for Arts and Cultural Affairs Owosso Community Players

5631 South River Drive, Grant Michigan, Bridgeton Township, Newaygo County, Michigan Bridgeton Community Boat Launch

Independence Twp. Blue Lake Township

P P A 4/9/2009 Immediate

Township Boat Launch renovation and expansion for improved access to the Muskegon River project is based on the portion of the Muskegon River's most heavily fished and State Fisheries maintained region. Over the past several years, as employment has become more urban-centered and local and regional industry has closed down, the recreational interests have become the most viable economic boon to the rural community in general and to Bridgeton Township in particular. 4/1/2009

T O

N s

Provide wireless connectivity to Township buildings and all DPW sites through out the township. The sysem would provide remote pump control, monitoring, alarming and Wireless Multi-Point Broadband System with data trending. Provide video surveillence of critical water supply and wastewater 100 Mbps Backhaul collection systems 4/9/2009 Road Extension Five miles road extention Spring

t s e

Benton Harbor

Water Street Glassworks Metalsmithing Building Rehab Project

Water Street Glassworks is poised to rehab a concrete block building adjacant to our main building for use as a metalsmithing facility. The rehab project will create 4 to 6 jobs immediately. The facility will compliment our glass arts program; currently we offer minimal metal/glass arts opportunities, but anticipate an increase in classes, creating 2 to 3 teaching jobs, minimal. Also, we are hopeful of collaborating with YouthBuild! or other local programs to offer jobs skill training, for which additional teachers will beneeded. 5/1/2009

City Owosso

Proforming Arts Canter Rebuild

Rebuild Lewbowski Proforming arts Center after fire of 2007

i m

b u S

Port City Constructions & Development Services, LLC Muskegon City Somerset Township, Somerset Township Hillsdale County Mi Somerset Township, Somerset Township Hillsdale County Mi

02262009

Russell Block Market Regraveling Roads

Pave Road

u q e

R d

e t tt

O R

May, 2009

June, 2009

$

263,952

$

Barber School, Post Office Lot and 60,000 Clock Tower Lot

$

80,000 Meridian Street

D VE $

From S. Park to S. Division on the 100,000 Grand River

5/9/2009 9/9/2009

$ $

10/9/2009

$

150,000

8/9/2009

$ $

600,000 956,000

Sept. 1, 2009

$

53,763

$

4,000,000

$

2,110,000

$

826,027

$

1,247,000

Russell Block Market - Creation of an open-air, indoor marketplace in downtown Muskegon as part of the redevelopment of the "historic" Daniel's Building. The threestory, 25,000 square foot plus marketplace features a variety of upscale retail tenants together with local and regional artists displaying their work in a 2,000 square foot art gallery. The Market provides an opportunity for both start-up and established businesses, artists and skilled craft-people to come together to create a dynamic shopping environment. The Market also includes indoor cafe seating, an outdoor community gathering place, and is wi-fi enabled. The Russell Block Market promises to be a key and catalytic development in Muskegon's new downtown - linking our past to the future in an historic building while offering local patrons, businesses and tourists alike an exciting shopping destination. 3/1/2009 7/1/2009 Gravelling of all earthen roads in Somerset Township 48 mile total. 22' wide X 253440' long X 3" thick of road gravel. 51627 cubic yards required. September1,2009 Octber 15, 2009 Pulverize existing bituminous road, enhance base and repave Waldron Rd. from US12 to Addison Rd (5 mi) September1,2009 July 15,2010

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

110,000 Meridian Street 5,000,000

955 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Somerset Township, Somerset Township Hillsdale County Mi Somerset Township, Somerset Township Hillsdale County Mi

Wayne County Village of Shepherd

Huron Twp. Shepherd

City of Corunna

City Corunna

City of Durand City of North Muskegon

City Durand

City of North Muskegon City of North Muskegon

Independence Township

Project Name

Project Description Start Date Funding Request Restore ditches, removing berms thrown up by repeated grading and application of gravel September1,2009 September 1,2010 $ 1,625,000 1 1/2" bituminous overlay on 27 miles of Lake Somerset and Lake LeAnn residential September roads 1,2009 September 1,2011 $ 2,574,000

Shoulder Restoration Pave Roads

As a result of the globalization of the economy, all forms of transportation are growing By 2020, air cargo is expected to triple accounting for 40% of the value of trade. As such, Wayne County is leading a regional effort to develop an airport city (Aerotropolis and Pinnacle Aeropark) with a focus on expansion of logistics and transportation operations. Experts estimate that these developments will add 60,000 new jobs to the region. In support of increasing logistics operations, Wayne County requests stimulus funds to develop a Logistics' Institute focused on supply chain managment accceleration with emphasis on air cargo and establishing a telecommunications portal for global logistics. These initiatives capitalize on the expansion opportunities at the existing Willow Run Cargo facility, the Detroit Metro Airport and 25,000 acres of undeveloped land along I-94 & I-275 linking a 10-county area in SE Michigan, and the Detroit Region Aerotropolis - Pinnacle/Willow city of Detroit and to domestic and international markets. The funds will be used to immediately support business acceleration activities (such as marketing, access to dis3/9/2009 Run Logisitcs Hub Street Reconstruct Wright Avenue from east village limit to Fourth Street Jule 1 2009 Full utitilites and infrastructure for development of Industrial Park and road improvementto site Full utitilites and infrastructure for development of Industrial Park and road improvementto site Capture surface drainage of entire East end of city to property and envirohnmentally Conservation Club/Lake Street outfall drain storm water 5/18/2009

T O

City of North Muskegon

City of North Muskegon

Berry Junction Bicycle Trail

City of North Muskegon

Center/Lake Resurfacing

Independence Twp.

d e t

Independence Twp.

Muskegon County

Muskegon City

Pere Marquette Township Village of Caseville

Pere Marquette Charter Township Village of Caseville

Village of Ovid

Ovid village

S

-N

e u

$ $

4,500,000 500,000

$

4,813,500

$

1,750,000

$

200,000 On city property On city right of way/Whitehall 500,000 Road Whitehall Rd to 1,243,000 Mills Ave

9/18/2009

$

5/1/2009

8/26/2009

$

M-15 sanitary sewer lift station upgrade to provide improved reliability of the township's largest sanitary sewer district through the replacement of 35 year old electrical equipment and emergency generator. Eficiency will be improved through the installation of variable speed drives for the pumps. Also, the improvements will promote a greener system through lower emissions and odor filtration and the reduction in noise emissions with the sound attenuation of the emergency generator. 5/9/2009

10/9/2009

$

2/10/2009

$

2,000,000

3/31/2011

$

10,000,000

7/31/2009

$ $

180,000 21,015

$

90,000

Transit Parking Ramp

First Street Water Extension Parkside Curbing

Extension of approx. 1650 l.f. of watermain from First Street along S. Pere Marquette Hwy. (Business U.S. 31) to complete a loop in the water service system for service in business/industrial sector including two business/industrial parks. 4/1/2009 Curb & gutter M-25 from present curb to Emerich Dr.

Pine Knob Well house upgrade Arsenic Removal

3/10/2009 August 1 2009

8/26/2009

Replace large culvert wundr Williams St and change right angle turn to accomadate truck routing to Michigan Milk Producers Assoc. Needed for safety reasons

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

6/1/2009

Upgrade the Pine Knob well house with the installation of an iron and arsenic removal system which includes replacement of the failing electrical equipment. This well site is currently out of service due to the arsenic level of the wells exceeding the current maximum allowable standards. This well house is a critical component of the Township's water supply system due to it's required backup capability in it's service area and it's capability to provide backup service to the system as a whole. 5/9/2009 Construct a downtown Muskegon Transit Center and Parking Structure for the Muskegon Area Transit System. 4/1/2009

m b u

Independence Township

s t s

O R

P P A

Construct bicycle trail on existing city right of way to connect with City of Muskegon Shoreline Trail and northern proposed trails Resurface - add safety center lane on Lake and Center Steret throughout business district

q e R

M-15 Sewer Lift Station Reliability and odor improvements

itt

02262009

Expected Completion Date

6405 M-15 900,000 (Ortonville Road)

956 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Village of Ovid Ovid village Village of Shepherd Shepherd

Wayne County

Wayne County

Project Name Water

Project Description Create second entrance to Michigan Milk Producers Assoc. truck routing Replace 11,200 lineal feet of 4" water main

WayneCounty.com / eGovernment

The new Wayne County web site will be a portal for eGovernment services. The services will be enabled through implementing an Enterprise Processing Engine to enable customized technology solutions. These solutions will be built using three primary functions of the engine: (1) Business Process Management/Electronic Workflow, (2) Electronic Records Management (legal, health, social, etc.) and (3) Electronic Document Management. Each of the individual technology solutions will be built on this standard, best-in-class enterprise processing engine, resulting in: • Cost savings in human resources due to a streamlined skill set to support a single enterprise platform rather than multiple platforms and software. • Cost savings to Wayne County in terms of single platform licensing and support costs versus the cost to support multiple software and hardware license agreements. • Minimized hardware costs due to standard and centralized hardware to support a single enterprise processing platform. • Streamlined and efficient Wayne County business processes • Best-in-class processing technology to deliver maximum performance on a future-read9/1/2008

7/1/2010

$

1,000,000

10/1/2009

$

360,000

5/1/2009

9/30/2009

$

4,271

5/1/2009

9/30/2009

$

8,543

9/30/2009

$

15,000

9/30/2009

$

19,100

9/30/2009

$

20,760

T O

Start Date

Expected Completion Date

July 1 2009

July 1 2014

P P A

O R

$ $

Funding Request 150,000 770,000

D VE

Wayne County

Wayne County

Youth Technical Training Project

Program to establish seasonal training for youth interested in technology. This initiative recognizes the impact technology will have in our Country's future success. Wayne County will endeavor to establish programs whereby youth can experience hands-on training in the Technology arena, preparing them for future jobs within the industry. Cost: $360,000 7/1/2009

Village of Millersburg

Village of Millersburg

Resurfacing of Streets with inch asphalt

Luce St. from Cedar to Linden

Village of Millersburg

Village of Millersburg

Resurfacing of Streets with inch asphalt

Cedar St. from Miller to Luce

Village of Millersburg

Village of Millersburg

Ditch and fill

Village of Millersburg

Village of Millersburg

Village of Millersburg

Village of Millersburg

Kimball Rd. 5/1/2009 Install septic field and andicapped bathroom in old fire hall for conversion to public Septic and Bathroom library 5/1/2009 Corner of Luce and Linden to Main St. and VFW and Corner of Chandler and Elm to Install storm drains with pipe and catch basin VFW and Main 5/1/2009

Village of Millersburg

Village of Millersburg

Resurfacing of Streets with inch asphalt

Walker Hwy from Main to Corriveau Rd.

5/1/2009

9/30/2009

$

45,104

Village of Millersburg

Village of Millersburg

Backhoe Purchase

Purchase backhoe for water system and street use

5/1/2009

9/30/2009

$

750,000

Reconstruction of the 70+ year old 50' bridge with a pre-fabricated steel structure with wood decking. The current bridge is showing significant deterioration due to loading and weathering of the concrete. The cross member support beams are also severely deteriorated and in need of replacement. The original wooden pilings are in poor condition and extended future services is doubtful. (Priority: 1 - Mandatory/Critical) 8/9/2009

11/9/2009

$

217,350

2009

$

300,000

8/1/2009

$

200,000

City of Escanaba

Escanaba

City of Charlotte

City of Charlotte

City of Muskegon

Muskegon

City of Muskegon

Muskegon

City of Muskegon City of Muskegon

Muskegon Muskegon

City of Muskegon

Muskegon

02262009

e u

S

eq

R d

e t tt

i m

L-Dock Marina Upgrade

ub

s t s

-N

CARA Relocation

12/1/2009

$

300,000

LC Walker Arena Restaurant / Clubhouse Kruse Park Upgrades

Relocate and upgrade recycling facility to handle increasing traffic and tonnage. 2009 Road reconstruction, addition of greenspaces, benches, trash cans, bus stop, storwmater filters, signage. 5/9/2009 Expansion of current building. Addition of alternative energy equipment (wind turbine, LED lights, etc.). Suite for additional commercial space. 5/9/2009 Remodel annex, add locer rooms, upgrade restroom facilities, aoncert to energy efficient building and add restaurant accomidations. 5/9/2009 Alinning of sanitary sewer to prevent sewer backups 5/9/2009

9/1/2009 9/1/2009

$ $

600,000 600,000

Former Fire Station Retrofitting

Improvements to the former Central Fire Station to convert to office use, allowing for up to 50 working spaces. Add wind turinines, LED lighting, and green roof. Make ADA compliant. 5/9/2009

9/1/2009

$

700,000

Lakeside Business District Improvements Surf Shack

Submitted Requests - Not Approved

Route (Infrastructure Only)

957 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Muskegon City of Charlotte City of Charlotte City of Charlotte

Fremont Area District Library

City of Escanaba

City of Escanaba

City of Escanaba

City of Escanaba

City of Escanaba

Project Name

Project Description Make City Hall more energy efficient by adding wind turbines, green roof, energy efficient light bulbs, porous material for parking areas. Upgrade all City facilities to T8 lighting Replace aging fire trucks Rehabilitate several major streets in the City

Muskegon City of Charlotte City of Charlotte City of Charlotte

Muskegon Public Works Building T8 Lighting Fire Trucks Road Projects

Fremont City

Install an Energy Management System in the 49,000 sq ft. Fremont Area District Library. The system would enable the library to reduce energy usage, ensure lower Fremont Library Energy Management System maintenance costs, and enhance the comfort of patrons.

Start Date 5/9/2009 2009 2009 2009

9/1/2009 2009 2009 2009

w/in 30 days of notification

$ $ $ $

1,000,000 65,000 1,750,000 2,050,000

w/in 60 days of notification

$

84,315

11/14/2009

$

3,000,000

O R

D VE

Major Street Reconstruction

Escanaba

Waste Water Co-Generation Program Methane to Electrical Power

Taking the generated methane by-product as a fuel source to energize an electrical generator, will produce "green" electricity for plant operations. (Priority: 2 Necessary)

9/9/2009

12/9/2009

$

500,000

Escanaba

Construct North 26th Street Connecting 3rd Avenue North and 6th Avenue North

The expansion is needed so that additional property can be developed which will increase our economic base and relieve traffic congestion. Additionally, two major commercial streets will be connected with North 26th Street. (Priority: 3 - Desired)

8/9/2009

11/9/2009

$

700,000

Electrical Distribution Pole Testing and Replacement

Approximately 380 distribution poles have been identified as needing replacement in order to maintain our electrical distribution integrity. Most of the poles were installed in the 1950's. (Priority: 3 - Desired) 7/9/2009

11/9/2009

$

950,000

Escanaba

Electrical Distribution Substation Installation

A substation is needed which will reduce the voltage from the transmission voltage down to distribution voltage (69,000 volts to 12,470 volts). A substation is needed to handle existing customers' growth loads and potential new customer needs. (Priority: 2 - Necessary) 12/12/2009

12/13/2009

$

2,000,000

Wayne County Detroit, Michigan

Alternative Buses And Trucks: Utilize Trucks and /or Vans to perform our daily work duties throughout Wayne County. Since we do not generally travel to far, the use of alternative vehicles would be a good fit for this type usage. We could use either Trucks and/or Vans. We use both on a daily basis and our fleet is old, outdated and in desperate need of replacement. Having Wayne County use these alternative fuel WCR - 9 (Use of Alternative Fuel Vehicles to vehicles would help set the standard for others to follow and would reduce energy perform the duties of Wayne County Buildings costs, reduce maintenance costs, and reduce vehicle downtime. Our estimated cost Division). for this initiative is $171,000.00 to purchase alternative vehicles. Immediate

$

750,000

Escanaba

Escanaba

A T

s

t s e

O N

PP

R d

e t tt

i m

b u S National Center for Manufacturing Sciences

Funding Request

The City has a need to maintain, resurface and curb deteriorated streets throughout the community. The project is needed to stimulate the investment into the community and preserve existing property values. Resurfacing and curbing repairs are needed for approximately 63 miles of existing streets. (Priority: 1- Mandatory/Critical) 7/9/2009

u q e

Wayne County

Expected Completion Date

Ann Arbor, MI

02262009

Diesel Fuel Additives to Reduce Toxic Emissions and Improve Fuel Economy

The trucking industry uses an estimated 290 million gallons of fuel daily. Regulations aimed at reducing the amount of diesel particulates and nitrogen pollutants (NOx) generated by heavy trucks and busses went into effect in 2007. While the regulation provides for substantial improvements in toxic emissions, average fuel economy has been reduced on some equipment by an estimated 3-6%. In addition, cargo capacity has been reduced slightly due to the increased weight of the emissions equipment such as heavier radiators, exhaust gas recirculation (EGR) coolers, catalytic converters, etc. The combination of reduced mileage and increased fuel costs has added a significant financial burden to both truckers and shippers. Additionally, existing fleets that do not comply with the 2007 emissions standards continue to impact the environment. The National Center for Manufacturing Sciences (NCMS) led an earlier study to evaluate diesel fuel additives that could potentially impact fuel economy and emissions favorably. The two and one-half year study funded through a 3rd Quarter of DOT/NHSTA cooperative agreement was completed in early 2009. The main tasks of 2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

The vehicles could be used until they are no longer serviceable

4th Quarter of 2010

958 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

National Center for Manufacturing Sciences

Project Name

Project Description

Start Date

Ann Arbor, MI

NCMS proposes a collaborative program with advanced battery manufacturers and automotive manufacturers to develop and implement vital educational programs for transitional and displaced manufacturing/maintenance workers in Michigan, in order to prepare future workforces to exploit near-term opportunities in the alternative energy transportation industry. Specifically, the NCMS proposes to re-purpose existing training systems and e-learning curricula in order to (1) develop structured training curricula and demonstration technologies for technicians to learn the fundamentals about alternate power systems for new fuel cell and hybrid vehicles, (2) gain insight to the unique infrastructure requirements for these new technologies, and (3) motivate youth in Michigan to develop a career path towards maintenance certification as Automotive Service of Excellence (ASE) specializing in cleaner power vehicles. The Maintenance WorkforceTraining in Alternative nation’s successful transition to mass application of newly developed clean alternative Energy Technologies for 21st Century energy technologies for automotive usage will be measured in the long term by the Vehicles anticipated societal and environmental benefits in order to justify early government sup90 Days

Ann Arbor, MI

Cross-Industry Modeling Applications of Phase Transformation Kinetic Data for Improved Efficiency in Manufactured Steel Components

The National Center for Manufacturing Sciences (NCMS) has convened the Steel Joint Industry Alliance (JIA) - comprising members of American Iron and Steel Institute (AISI), American Foundry Society (AFS), ASM Heat Treating Society (HTS), Center for Powder Metallurgy Technology (CPMT), and the Forging Industry Association (FIA). The CIMA project has been organized to address needed efficiency improvements in manufacturing of critical steel components. It brings advanced computational technology and skilled worker training for the steel value chain processing vendors located in Michigan that support the transportation components industry. This project is an enabler for the production of higher quality steel bar and rod products used in multiple industries, from automotive and off-highway vehicle components to rebar and reinforcements used in the construction of highways, buildings and bridges. The purpose of this two-year collaborative project is to apply a newly developed standard practice for obtaining and archiving quantitative steel transformation kinetic and thermal strain data to several steel grades used in manufac 90 Days

Ann Arbor, MI

Retrofitting existing buildings to improve their energy efficiency is labor intensive and time consuming. It is important to maximize returns in efficiency for the effort expended. Heat loss from buildings is a complex problem. Insulating one area can change air flow patterns, which can in turn affect the relative efficiency gains possible from insulating other areas. It is usually possible to improve efficiency in any area by increasing insulation thickness or using more expensive materials, but that adds to the cost. Finding the maximum gain in energy efficiency attainable with a given budget of time and money poses a difficult modeling problem. This proposal has two mutually reinforcing components. One is to create computer models that will calculate optimal insulation strategies for specific buildings. The other is to install insulation in a large number of buildings of different types, and to validate the model by collecting data Smart Insulation to Maximize Building Energy before and after retrofitting. The project will create models for ten different building types, and will retrofit 2,000 buildings across the various types during the course of the90 Days Efficiency

T O

National Center for Manufacturing Sciences

d e tt

National Center for Manufacturing Sciences

Expected Completion Date

O R

P P A

Funding Request

Route (Infrastructure Only)

D VE $

2,000,000

$

5,500,000

$

6,000,000

N s

t s e

qu

e R

t i m

ub

9/30/2011

S 02262009

Submitted Requests - Not Approved

959 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

National Center for Manufacturing Sciences

City of Fremont

Project Name

Project Description

Start Date

Ann Arbor, MI

Many vehicle parts can be made to last for several vehicle lifetimes. The remaining value of the part is generally lost when the vehicle is scrapped. If the parts can be easily removed from the end-of-life vehicle and used in another, their value can be extended. Less of the vehicle would go to the landfill, and less energy and raw materials would be needed to make a replacement part from scratch. The object of this proposal is to capture the future value of these parts by leasing them to owners throughout their useful life. The value can be realized now by reducing the cost to the buyer of financing a new vehicle stimulating manufacturing activity by parts suppliers, increased vehicles sales, and lower costs to the buying public. This project will purchase new parts from automotive components and subsystems manufacturers. Parts will be rated on a scale based on the cost of the part divided by its expected service life. The parts will be installed in vehicles. Some parts may be made available to OEMs for installation in the vehicle. The OEMs will not be charged for the Quality Auto Parts for Long-Term Lease (Pilot) parts. They can deduct the cost of the parts from the cost of the vehicle to the dealer. 90 Days

City of Fremont

In accordance with our Capital Improvement Plan, Elm Street is slated to have watermains replaced and the street reconstructed and extended to a proposed Fremont Street Project for Elm and Ramshorn development, and Ramshorn Drive is slated to be resurfaced. Elm Street is the main (Infrastructure) secondary route for Gerber/Nestle traffic from the south and east. 4/1/2009

$

850,450

4/1/2009 5/1/2009 5/1/2009

$ $ $ $

10,000,000 120,000 200,000 350,000

5/1/2009

$

350,000

6/1/2009

$

500,000

6/1/2009

$

565,000

6/1/2009

$

669,000

5/1/2009

$

700,000

4/1/2009 4/1/2009 4/1/2009 4/1/2009

8/1/2009 5/1/2009 7/1/2009 7/1/2009

$ $ $ $

860,000 898,400 1,000,000 1,000,000

4/1/2009

6/1/2009

$

1,200,000

Avondale Re-paving Flamingo St Reconstruction Norwayne Sewer CIP Grand Traverse Pavement Replacement Newburgh Rd Preventative Maintenance program

Replace existing failing public road with new pavement and subbase section Replace existing road pavement and address any public utility issues Reduction of cfs in CSO are 37 based on sanitary sewer SSES study Replace existing failing public road with new pavement and subbase Rehabilitate Newburgh Rd with joint sealing, over banding, concrete base repair, and overlay

Ann Arbor, MI Westland Westland Westland

Center for Hydrogen Fuel Cell and Storage Systems Manufacturing Police Station Computer Replacements In-car Computer Replacements RandySt Resurface & reconstruction

City of Westland

Westland

Increase Patrol Vehicles

City of Westland

Westland

Cherry Hill and Newburgh Rd Intersection

City of Westland

Westland

City of Westland

Westland

City of Westland

Westland

City of Westland City of Westland City of Westland City of Westland

Westland Westland Westland Westland

City of Westland

Westland

02262009

9/1/2010

O N

R d

e t tt

i m

ub

u q e

Warren Rd/Newburgh Rd Intersection Florence St Drainage

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 10,000,000

Increase Emergency Dispatchers

National Center for Manufacturing Sciences City of Westland City of Westland City of Westland

S

PP

An urgent need exists in Michigan for the accelerated development and transition of viable high-volume manufacturing technology and infrastructure for the alternative energy industry and the development of a comprehensive innovation ecosystem to support the emerging fuel cell applications that will proliferate. The major commercial automotive companies are all currently focused on improving technical performance, but they are struggling with implementation and qualification of fuel cell manufacturing technologies across the supply base. The transition of technology from prototypes and field trials to real manufactured products is still a major challenge. NCMS has considerable expertise in benchmarking, developing, integrating and demonstrating new, cost-effective manufacturing processes, advanced materials, in-process diagnostics and assembly solutions. Therefore, it is well placed to help both Michigan industry and government tackle the problems involved in developing and deploying these new technologies to assist small and medium manufacturers in diversification of their product offerings. NCMS has successfully established public-private collaboratio 5/1/2009 Replace 30 Police station Pc's 4/1/2009 Replace 30 In-car computers with new up to date modems 4/1/2009 Select slab replacement with full depth reconstruction of existing pavemen 4/1/2009 Purchase 10 fully marked scout cars that will be fully complimented with current electronic equipment 4/1/2009 Upgrade signal to incorporate a left hand turn lane on eastbound Cherry Hill and replace existing pavement 4/1/2009 Modernize the intersection with pavement replacement and traffic signal improvements 4/1/2009 Correct existing drainage problems and flooding with new proposed pavement and storm sewer 4/1/2009 Hire 8 emergency dispatchers that will provide service for two communities and cover both Police and Fire Departments 4/1/2009

t s e

O R

Funding Request

$

A T

s

Expected Completion Date

960 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Westland City of Westland City of Westland

Westland Westland Westland

Project Name

Project Description Replace existing pavement with 9" concrete cross-secction and repair existing infrastructure problems Replace failing road pavement, water main, sanitary, and storm sewer Pave existing roads and improve storm sewer system to reduce flooding

Norma Street Reconstruction Mathew St Reconstruction Wayne Highlands Drainage Project

Start Date 4/1/2009 4/1/2009 4/1/2009

5/1/2009 5/1/2009 7/1/2009

4/1/2009 4/1/2009

5/1/2009 7/1/2009

City of Westland City of Westland

Westland Westland

Increase Patrol Officers City Sanitary Sewer CIP

City of Westland

Westland

Drain Disconnect Program

City of Westland

Westland

Gravel Road Paving

Hire 20 police officers to bollster patrol response, to have fulltime crime suppression on each shift, provide school resource officer and add additional community police officers. Replace old and failing infrastructure of the City's sanitary sewer system Disconnect 1,000 homes from footing drain discharge going into the sanitary sewer systme and reduced treated cfs. Pave all gravel roads throughout city with 4"/8" bituminous pavement or 7" concrete pavement and construct proper storm sewers

Indexing into the system documents that have been scanned but not indexed, for retrieval by the public and title companies for title searches to help constituents when purchasing real estate. This project would help get our systems up to speed and help in employing 1 or 2 employees. A much needed project. Immediately

Newaygo County

Newaygo County

Indexing

City of Westland

Westland

Public Facility Renovations - Fire Station #5

City of Westland

Westland

Public Facility Renovations- Dorsey Center

City of Westland City of Westland

Westland Westland

City of Westland City of Marysville

Westland Marysville

Public Facility Renovations - Senior Center Central City Park Remediation Central City Park Concession building replacement Marysville City Hal

City of Midland

City of Midland

Non-Motorized Pathway

City of Muskegon City of Muskegon

Muskegon Muskegon

Clay Hill Sanitary Sewer Bike Path, Phase IB

City of Muskegon City of Muskegon

Muskegon Muskegon

Smith-Ryerson Park Former Fly Ash Site / Consumers

City of Muskegon

Muskegon

Water Filtration Plant Wind Turbines

tt i m

d e t

Lansing, MI

02262009

1,700,000 1,743,000 2,200,000

$ $

2,400,000 3,000,000

$

10,000,000

7/1/2009

$

10,230,000

3 Years

$

60,000

2,500,000

8/1/2009

Route (Infrastructure Only)

D VE

4/1/2009

6/1/2009

4/1/2009

5/1/2009

4/1/2009 4/1/2009

5/1/2009 6/1/2009

4/1/2009 Unknown

6/1/2009 Unknown

$

7/1/2009

11/15/2009

$

450,000 Patrick to Ashman

2009 7/9/2009

7/1/2009 Spring 2010

$ $

150,000 230,000

2009 2009

7/1/2009 7/1/2009

$ $

250,000 1,700,000

Development of the Shoreline Trail to expand public access property and waterways. Development of a sports complex to include up to 8 soccer fields. 2009

9/1/2009

$

3,000,000

PBS Biotech is developing innovative disposable bioreactors for the rapidly growing biotech industry and is poised to transform the current manufacturing standard from stainless steel bioreactors to single use systems. The company intends to establish a manufacturing and business facility in Michigan to commercialize its products, which will create jobs and expand other associated business in the region. Once commercially successful, PBS biotech also will provide its superior technology to the government to aid in its rapid response against a potential influenza pandemic. Over the past few years, concern regarding the potential outbreak of the avian influenza virus H5N1, or bird flu, in the human population has risen dramatically. The US Department of Health and Human Services (H&HS) has been supporting the development of mammalian cell culture-based vaccines, which provide the benefits of a faster and larger manufacturing capacity compared to the current egg-based manufacturing methods. These vaccines will be produced in large scale stainless steel bioreactors with the H&HS recently awarding a $487 MM project to build the first Immediately

12/9/2009

$

4,000,000

s t s

-N

e u

q e R

Development of Large Scale, Single-Use Bioreactors for Rapid Response to Potential Bird Flu Pandemics

4/1/2009

Funding Request $ $ $

O R

4/1/2009

P P A

Constuct new LEED Certified City Hal Extension of existing trail to serve Stratford Park and works towards completion of a loop around the City.

b u S PBS, Biotech, Inc.

T O

Expected Completion Date

Improvements to parking area. Porous Pavement. Make building energy efficient. construct the last piece that connect the Musketawa trail to Laketon Upgrades to the parking area and facilities at Kruse park. Porous pavement, LED lights. Building improvements including green elements, addition of tennis courts

Submitted Requests - Not Approved

961 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Merrill Township

Bitely/Merrill Township

Southeast Michigan Regional Energy Office Roseville

Project Name

Southeast Michigan Regional Energy Office Ferndale

Southeast Michigan Regional Energy Office Ferndale

Southeast Michigan Regional Energy Office City of Farmington Hills

We live in a very poor community, which primarily consists of senior citizens living in poverty and substandard housing, our winters are long and severe. We are looking to provide an apartment complex in our community to assist our seniors. We need to have low income housing and provide them with support locally. 7/9/2009

Merrill Twp Housing project

11/10/2009

Southeast Michigan Regional Energy Office Ferndale City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City Grand Haven City Grand Haven City Grand Haven City Grand Haven City

D VE $

550,000

$

800,000

2011

$

1,942,000

O R

Police Station Renovations

Ferndale City Hall Renovations

City Hall was constructed in the 1960s and is in need of updating and renovation. With the proposed 43rd District Court constructed adjacent to City Hall, renovations could be made for all departments and activities performed by the City. All departments would be housed under one roof with sufficient space and technology upgrades consistent with the current requirements of municipal governments. This project would consist of updating and renovating the existing City Hall to current standards.

2010

2011

$

2,282,000

43rd District Court

The existing 43rd District Court is currently located in a 6,000 sq ft building which was converted years ago from a former mattress outlet store. The existing building is classified in poor condition and requires constant maintenance. The existing court house is located across from the Police Department which requires frequent crossing of a busy 4 lane road by Police Officers. The City of Ferndale has approved the construction of a new 12,000 sq ft facility which will be located adjacent to the City's Police Station on City owned property. The project would consist of the construction of a new 12,000 sq ft District Court adjacent and connected to the City's Polie Station. 2010

2011

$

3,500,000

$

5,314,000

$ $ $ $

13,526,000 258,000 300,000 484,000

$ $ $ $

608,000 707,000 741,000 748,000

T O

s t s

P P A

-N

e u

eq

R d

e t t

I-275 Living Wall

m b u

S

Funding Request

The existing Police Station was constructed in the 1960s and is considered obsolete due to current size constraints. Currently in the planning and preliminary design phas is the relocation of the 43rd District Court building. District Court is to be relocated adjacent to and connected with the Police Station. This project would consist of updating and renovating the existing Police Station to current architectural design standards for standard police activities and protocols. 2010

it

02262009

Start Date

Parks and Recreation Building Rehabilitation Parks and Recreation Building Rehabilitation.

Southeast Michigan Regional Energy Office Ferndale

City of Grand Haven City of Grand Haven City of Grand Haven City of Grand Haven

Project Description

Expected Completion Date

Dept of Public Works Facility Beacon Street Fifth St. Full Reconstruction Second St. Full Reconstruction Eighth/Clinton/Howard Street Full Reconstruction Lafayette St. Full Reconstruction Beechtree Street Griffin St. Full Reconstruction

This project is proposed on the east side of I-275 from Eight Mile to just south of Nine Mile. This is a demonstration project to show the feasibility of constructing a Living Wall to protect the abutting residential properties from traffic noise. The Living Wall was selected due to the site constraints along this route as well as provide an environmentally appropriate wall surface for the motorists and the abutting property owners.

The Department of Public Works facility was constructed in the 1940s and has consisted of minor additions and upgrades over the years. Currently, the DPW has four separate buildings and a fuel area. The DPW is responsible to maintain infrastructure, parks, buildings, snow removal, tree trimming. DPW personnel are on the front-line of the federal homeland security. This project would consist of reconstructing the Department of Public Works facility to current design standards and homeland security requirements. 2010 Sanitary sewer with minimal construction Spring 2013 Water, sanitary, storm and roadway Water, sanitary, storm and roadway Spring 2010 Water, sanitary, storm & roadway on Clinton/Eighth; Sanitary sewer/resurface Howard Water, sanitary, storm and roadway Water main construction (no resurfacing), Hayes to Robbins Water, sanitary, storm and roadway

Submitted Requests - Not Approved

2011 2013 2010

Route (Infrastructure Only)

962 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City City of Grand Haven Grand Haven City

Project Name Grandview Area Reconstruction Pennoyer Ave. Full Reconstruct Adams St. RR Crossing Boardwalk at City Connector Park Washington Avenue Full Reconstruction Lake Ave. Full Reconstruction Fulton Street Full Reconstruction Harbor Dr. Full Reconstruction Beechtree St. Full Reconstruct. Beechtree St. Full Reconstruct.

City of Grand Haven City of Grand Haven City of Grand Haven City of Muskegon City of Muskegon City of Muskegon City of Muskegon

Grand Haven City Grand Haven City Grand Haven City Muskegon Muskegon Muskegon Muskegon

Sheldon Area Reconstruction Grand Ave. Full Reconstruction North End Infrastructure Veridian Dr. Road Connection Veridian Dr. Reconstruction Ottawa St. Bridge Reconstruction Getty St. Reconstruction

City of Muskegon

Muskegon

Henry St. Extension

Project Description Water, sanitary, storm and roadway Water , sanitary, storm and roadway New R/R crossing connecting to Third Street Reconstruct the boardwalk (ACOE) Water, sanitary, storm and roadway, Harbor to Fourth Water, sanitary, storm and roadway Water, sanitary, storm and roadway Water, sanitary, storm and roadway, Prospect to Dale Court Water, sanitary, storm and roadway, Waverly to N. of Fulton Water, sanitary, storm and roadway, Robbins to Waverly Water, sanitary, storm and roadway - 5 streets; sanitary, sewer and resurface - 3 streets Water, sanitary, storm and roadway WWTP treatment improvements Connect Veridian Dr. and Terrace Point Dr Reconstruct easterly portion of Veridian Dr. to Seaway Dr Reconstruction of Ottawa St. bridge. Reconstruction of Getty St. from Laketon Ave to Apple Ave. Extend Henry St. north of Laketon Ave. to Western Ave. The project will link the Henry street business district to downtown.

Ann Arbor, MI

Prevention of Obesity and Type II Diabetes

Obesity, Type II Diabetes and other related diseases are growing at an astounding rate and are costing the taxpayer billions of dollars per year to treat in the form of Medicare reimbursements as well as the cost to companies and individuals. Support of this project will further promising research that could provide food supplements capable of preventing these diseases from occurring, improving the health of the general population as well as reducing the financial burden on the federal government 90 Days

Grand Haven City

New Water Plant

Water treatment plant upgrade, increase capacity

Grand Haven City

WWTP Phosphorus Removal

Grand Haven City

Odor Control WWTP

Grand Haven City

UV Disinfection

Michigan Research Institute Ottawa County Road Commission Spring Lake Sewer Authority Spring Lake Sewer Authority Spring Lake Sewer Authority

Merrill Township

Bitely/Merrill Township

Northville Township City of Muskegon City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

West side of Township

tt i m

d e t

Merrill Twp Transfer Station/recycle

ub

Beck Road Booster Station Improvements, Elevated Tank and Water Main City Hall Building

S

$ $ $ $ $ $ $ $ $ $

Funding Request 966,000 987,000 1,000,000 1,000,000 1,172,000 1,505,000 1,562,000 1,737,000 1,776,000 1,997,000

7/9/2009 Spring 2010 9/1/2009 12/1/2009

$ $ $ $ $ $ $

2,020,000 2,063,000 4,500,000 100,000 250,000 450,000 800,000

Spring 2010

$

2,000,000

Yes

$

950,000

5/10/2009

$

20,000,000

WWTP treatment improvements

5/9/2009

$

350,000

WWTP treatment improvements

9/10/2009

$

1,000,000

WWTP treatment improvements

5/10/2009

$

1,100,000

T O

q e R

9/9/2009 9/9/2009

Spring 2010 Spring 2011

Spring 2012

5/9/2009 9/9/2009 9/9/2009 9/9/2009 9/9/2009

7/10/2009

N s

2011

O R

P P A

st

e u

Start Date

Expected Completion Date

D VE

2012

we currently have our own transfer station which we fund with millage. We are looking to expand, offer and encourage our citizens to recycle which would save our dollars overall. It is important to lean that direction and expand our services. We would like to have easy recycle access, bins for citizens to separate trash and education to encourage compliance within ouor community. 3/9/2009

8/9/2009

$

50,000

Modifying existing Beck Road Booster Station and construction of a 1 Million Gallon Tank, and water main.

5/1/2010

$

6,000,000

2009

$

90,000

City of Muskegon Heights Loader Redevelopment

4/1/2009

City of Muskegon Heights Water System Security Measures

Water Filtration Plant

2009

$

100,000

City of Muskegon Heights Sherman Street Pump Station

ADA and Security Upgrades

2009

$

225,000

City of Muskegon Heights Baker Street Road Resurfacing

Summit to Broadway

2009

$

350,000

City of Muskegon Heights Broadway Ave. Road Resurfacing

Glade to Ninth

2009

$

350,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

963 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

City of Muskegon Heights Baker Street Road Resurfacing

Broadway to Sherman

2009

$

400,000

City of Muskegon Heights Getty Street Reconstruction

Shermant to Broadway

2009

$

420,000

City of Muskegon Heights Getty Street Reconstruction

Hovey to Sherman

2009

$

460,000

City of Muskegon Heights Hackley Ave. Road Resurfacting

Park to Peck

2009

$

550,000

$

650,000

PP

$

650,000

$

650,000

2009

$

660,000

2009

$

750,000

Spring 2009

$

800,000

10/9/2009

$

1,000,000

6/9/2009

$

1,000,000

7/10/2009

$

1,000,000

7/9/2009

$

1,000,000

1/10/2009

$

1,000,000

10/9/2009

$

1,800,000

7/10/2009

$

2,000,000

2011

$

2,000,000

Adjacent to Mona Lake Park

7/9/2009

$

3,000,000

Facilily Expansion

Spring 2009

$

3,000,000

Expansion & Street Improvments

7/11/2009

$

4,000,000

2009

$

4,500,000

City of Muskegon Heights Mona Lake Park Redevelopment Project

6/9/2009

$

5,000,000

City of Muskegon Heights Rowan Park Expansion

7/9/2009

$

5,000,000

City of Muskegon Heights Water System Upgrade

7/9/2009

$

5,000,000

City of Muskegon Heights Peck Street Broadway Streetscape City of Muskegon Heights Peck St. Road Resurfacing

Summut to Sherman

2009

City of Muskegon Heights Airline Road Resurfacing

Hoyt to Peck

2009

A T

City of Muskegon Heights Snow Plow Vehicle Replacement Water Meter Replacement/Upgrade to City of Muskegon Heights Remote Reading System City of Muskegon Heights Youth Micro Business Development Project City of Muskegon Heights Bennett Pump Redevelopment

s

City of Muskegon Heights Mona View Cemetery

st

City of Muskegon Heights Charles Lindberg School/Park Development

e u

City of Muskegon Heights Business Development Fund City of Muskegon Heights Manahan Street Reopening City of Muskegon Heights Muskeogn Family Care Inc.

R d

Construction of Department of Public Works Building

City of Muskegon Heights Construction of Youth Center

e t t

City of Muskegon Heights Property Acquisition

it

City of Muskegon Heights West Michigan Therapy

m b u

eq

O N

Facility Expansion

City of Muskegon Heights Public Work Building

City of Muskegon Heights Muskettawa Bicycle Trail Edgewood Green Village Infrastructure City of Muskegon Heights Improvements

O R

2009/2010

S

D VE

City of Muskegon Heights Athletic Building Expansion

Muskegon Heights High School Athletic Building Expansion

7/9/2009

$

5,500,000

City of Muskegon Heights Wastewater Treatment Plant

Demolition & Infrastructure Improvements

4/9/2009

$

6,000,000

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

964 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights City of Muskegon Heights

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

City of Muskegon Heights Residential Street Replacement

7/9/2009

$

8,000,000

City of Muskegon Heights Strand Buliding Renovation

7/9/2009

$

9,000,000

$

10,000,000

$

10,000,000

$

25,000,000

PP

$

48,000

$

350,000

2009

$

375,000

2009

$

437,000

Spring 2009

$

450,000

2009

$

465,000

2009

$

488,000

2009

$

750,000

2009 Spring 2009 7/9/2009

$ $ $

2,010,000 150,000 250,000

7/9/2009

$

275,000

Spring 2009 7/9/2009 2009 7/9/2009

$ $ $ $

420,000 500,000 1,200,000 1,800,000

7/9/2009 2009 Spring 2009 Spring 2009 7/9/2009 Spring 2009 Spring 2009

$ $ $ $ $ $ $

5,700,000 3,135,000 1,700,000 2,103,000 11,842,000 1,400,000 1,800,000

City of Muskegon Heights Pedestrian Crosswalk

Over Seaway Drive

7/11/2009

City of Muskegon Heights Wind Energy Project

1/10/2009

City of Muskegon Heights Market Place and Train Station Plaza

7/9/2009

City of Roosevelt Park City of Roosevelt Park

Community Center Remodel

2009

City of Roosevelt Park City of Roosevelt Park

Sanitary Sewer Relining

2009

City of Roosevelt Park City of Roosevelt Park

Ballfield Rehabilitation

City of Roosevelt Park City of Roosevelt Park

Summit Mill & Fill

City of Roosevelt Park City of Roosevelt Park

Public Works Facility

City of Roosevelt Park City of Roosevelt Park

Glenside Phase II

City of Roosevelt Park City of Roosevelt Park

Greenwich Road

City of Roosevelt Park City of Roosevelt Park

16" Watermain

City of Roosevelt Park City of Roosevelt Park City of Whitehall City of Whitehall City of Whitehall City of Whitehall

Vertical Wells Playhouse Remodeling Misco Street Reconstruction

City of Whitehall

City of Whitehall

Municipal Marina Infrastructure Improvements

City of Whitehall City of Whitehall City of Whitehall City of Whitehall

City of Whitehall City of Whitehall City of Whitehall City of Whitehall

Day Springs Senior Housing Infrastructure Mears Avenue Resurfacing Slocum Street Reconstruction Tannery Redevelopment

Every Woman's Place Fruitland Township Fruitport Township Fruitport Township Fruitport Township Laketon Township Laketon Township

City of Muskegon Fruitland Township Fruitport Township Fruitport Township Fruitport Township Laketon Township Laketon Township

Facility Expansion Scenic Drive Hile Road Sewer Extension Water Main Extension Wastewater System Expansion Preservation of Scenic Drive Bike Trail

s

Between Roosevelt and Glenside

st

e u

Service Howment Alcoa

eq

O N

R d

e t tt

i m

ub

S

A T

Dykstra Road to Weber Road

O R

D VE

Mason/Lake Conservation District City of Ludington Mona Lake Watershed Council Egelston Township

Dennis Creek Road Crossing Sediment & Erosion Control Project

7/9/2009

$

160,000

Mona Lake Flow-Through Marsh Construction

5/10/2009

$

750,000

Muskegon Conservation District

Gateway Energy Efficiency Services

8/9/2009

$

73,000

County-wide

02262009

Initiating medium to large scale publuc and provate energy reduction projects

Submitted Requests - Not Approved

Route (Infrastructure Only)

965 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Muskegon Conservation District

County-wide

Countywide Forest Management and Timber Harvest Project Creation of a local wood products market through sustainable forestry

6/9/2009

Muskegon Conservation District

White Lake Area

White Lake Area Of Concern Shoreline Restoration

Priority wildlife habitat projects utilizing local contract work

7/9/2009

Muskegon

Headwaters Wetland and Stream Habitat Restoration

For pollution Prevention and Mitigation

8/9/2009

Fruitport Township Laketon & Fruitland Townships

Airline Road Structural Overlay

I-96 to US-31

2009

Scenic Drive

Fenner Road to South Shore Drive (7.83 Miles)

Muskegon

Replace Aging Diesel School Bus Fleet

Ottawa County

Lake Michigan Drive

Lakeshore Drive to US-31; Resurface 24' plus 3' sholder, 2 miles

Ottawa County

Apple Drive

County Line to 112th Ave,; Crack & Seal, pave 24' plus 3' sholder, 5.5 miles

Muskegon Conservation District Muskegon County Road Commission Muskegon County Road Commission Muskegon Public Schools Ottawa County Road Commission Ottawa County Road Commission

Expected Completion Date

$

85,000

D VE $

219,000

$

255,000

$

700,000

$

3,135,000

6/9/2009

$

3,780,000

2009

$

575,000

2009

$

1,750,000

8/31/2009

$

312,000

O R

P P A 2009

T O

Funding Request

-N

Pere Marquette Township

Pere Marquette Charter Township

Watermain Extension

Extension of spprox. 2600 l.f. of watermain on US 10 from S. Pere Marquette Hwy. to Jebavy Dr. to connect north and south side water service districts allowing access to municipal wall/water tower system on the south side. 5/1/2009

Pere Marquette Township

Pere Marquette Charter Township

Wireless Internet Service

Installation of wireless communication systems on existing towers and water towers to provide service to all businesses and residences in the Township. 6/9/2009

6/30/2010

$

600,000

Purchase and Development of Industrial Property

Purchase of former Harbison-Walker property (approx. 40 acres) on S. Pere Marquette Hwy. (Business US 31), cleanup of industrial site, and development into multi-use business park. Site has railroad access and potential Lake Michigan port access through the Dow Chemical Company property (by agreement which would have to be negotiated).

12/31/2011

$

1,746,000

In the event of a disaster, this system would: 1. Establish command centers 2. Add mobile units 3. Establish alternative communication systems and secondary hotsites for business continuity and public safety Cost: $2,000,000

$

2,000,000

This project will upgrade the existing GIS system and add data consolidation systems for Economic Development, Homeland Security, Law Enforcement, Assessment, Treasurer, and Registrar of Deeds for sharing data and to deliver taxpayer services. Cost: $500,000

$

500,000

Pere Marquette Township

Pere Marquette Charter Township

Wayne County

Disaster Response Management System

d e tt

Geographic Information System (GIS) Integration

t i m

Wayne County

Wayne County

Huron Twp.

02262009

b u S

Detroit Region Aerotropolis

s t s

e u

q e R

9/1/2009

Route (Infrastructure Only)

The planning for the Detroit Region Aerotropolis in SE Michigan with multiple governmental jurisdictions has two types of instrastructure improvements requirements. Those that are achieved by local district (municipal and county) and those that require state/federal funding assistance and oversight. In order to move forward with the significant road expansion required to plan and prepare for the development of the project an its 25,000 acres, funds for a road and infrastructure study is being requested from the Stimulus package.

Submitted Requests - Not Approved

966 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

West Michigan Shoreline Regional Development Commission

City of Whitehall

White Cloud/Sherman White Cloud City and Utilities Authority Sherman Township Wexford County

Wexford County

Project Name

Project Description

Start Date

Expected Completion Date

Whitehall Business Park

The proposed project consists of developing a park that creates seven business lots in a growing commercial area of whitehall, Michigan. Public utilites in the form of watermain and sewer extensions, along with access roads and drainage considerations comprise this project. Existing utilities _________ the site, and are therefore available to be extended and this will also improve the realiability of the Township's water system. The seven parcels will create new business sites that will attract businesses seeking a wooded and rolling site of like minded and high tech operations. The project has applied for permits to construct the utilities, and will be shovel ready in 30 to 60 days and ready for bids to construct.

Domestic septic treatment plant County-wide Preventative Maintenance Program

Add regaonal/biosolid domestic sewer treatment plant in Newaygo County. This would be a graet benefit to septic hauler and surrounding areas. 4/1/2009 47-miles of chipsealing, 30-miles of wedging. Various locations on 10/21/29/31/46/48 Roads, Boon, Harlan, Countyline Roads. 7/6/2009

O R 7/1/2009

P P A

Funding Request

D VE

8/30/2009

$

1,700,000 federal aid road

8/30/2009

$

2,200,000 federal aid road

8/30/2009

$

3,000,000 federal aid road

3/1/2009

3/1/2011

$

70,000

Hand-held computers for POC services - $75,000

3/1/2009

3/1/2011

$

75,000

Add building insulation and energy improving exterior upgrades - $300,000

5/1/2009

11/1/2009

$

300,000

Replace windows with energy efficient upgrades - $300,000

5/1/2009

11/1/2009

$

300,000

Crushing, shaping, repaving and drainage improvements to Boon Rd from M-115 east to Seeley Rd with the exception of the section that is included in Business Route U.S.131 7/6/2009 Overlay existing pavement, pave shoulders on hills, and drainage improvements to 16 Rd from M-37 to Manton City limits. 7/6/2009

T O

Wexford County

Wexford County

Boon Road Pavement Rehabilitation

Wexford County West Shore Medical Center West Shore Medical Center West Shore Medical Center West Shore Medical Center West Shore Medical Center West Shore Medical Center West Shore Medical Center

Wexford County

16 Road Repaving

Manistee, Michigan

Wireless system functionality - $70,000

Manistee, Michigan

West Shore Medical Center-Wireless System West Shore Medical Center-Hand-held Computers West Shore Medical Center - Insulation and Exterior Upgrades West Shore Medical Center - Window Replacement West Shore Medical Center-Nurse Continuing Education

Nurse continuing education program - operational - $750,000

7/1/2009

9/1/2009

$

750,000

Manistee, Michigan

West Shore Medical Center-Telemedicine

Telemedicine - Critical Care, Emergency and Cancer Services - $1,000,000

2/1/2010

8/1/2010

$

1,000,000

Manistee, Michigan

West Shore Medical Center-Wind Energy

Alternative Energy - wind generation - $2,000,000

2/1/2010

8/1/2010

$

2,000,000

Lift Station

lift station upgrade to achieve energy efficiency

5/15/2009

9/15/2009

$

200,000

Manistee County, MI Manistee, Michigan Manistee, Michigan

Village of Suttons Bay Suttons Bay, Village of

Village of Pellston Village of Pellston Village of Pellston Village of Pellston

Pellston, Village of Pellston, Village of Pellston, Village of Pellston, Village of; Emmet County

Village of Onekama Village of Onekama

Onekama, Village of Onekama, Village of

Village of Lake Ann

Lake Ann, Village of

02262009

e u

eq

R d

e t tt

Portage Lake Sewer System Sanitary Sewer Upgrade & Expansion

Paving of Village Street, Village of Lake Ann

Repaving of 4.0 miles of deteriorating Village streets. CR 610 (Maple Street) within the Village limits were paved in 1990. CR 665, CR 667 and the other local streets have not been repaved since 1985. The proposed project will include the repaving, adjusting of catch basins, milling the streets with curb and gutter to provide a water barrier and the restripping of the roads.

i m

ub

S

s t s

-N

the project would provide sewer service to the commercial and residential properties within the Village of Pellston, as well as to the Pellston Regional Airport. see above Renovate 5 block area of Pellston business district construction of a new aircraft rescue and fire fighting/snow removal equipment building. Installation of sanitary sewer collection system around Portake Lake and construction of community treatment facility per engineering study. Address leaks, faulty traps and extend service per engineer study

Pellston sewer Pellston water Streetscape

Pellston Regional Airport Improvements

Route (Infrastructure Only)

Submitted Requests - Not Approved

TBD TBD 6/15/2009

10/15/2009

TBD 9/1/2009 9/1/2009

6/1/2009

12/1/2010 12/1/2010

7/15/2009

$ $ $

US 31 Village limit to Village limit as well as the interior 6,000,000 roads 6,000,000 see above 800,000

$

11,500,000

$ $

15,738,250 600,000

$

CR 610, CR665 and CR 667 within the Village limits (2.02 miles) and the local streets 575,000 (1.98 miles).

967 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Village of Kalkaska

Kalkaska Village

watermain loop

Complete system watermain loop from Arby's to Northland Plaza

Village of Kalkaska Village of Kalkaska Village of Kalkaska

Kalkaska Village Kalkaska Village Kalkaska Village

Watermain loop Sewer Lift Station Upgrades Intersection Improvements

Village of Kalkaska Village of Honor Village of Holly Village of Holly Village of Holly Village of Ellsworth

Kalkaska Village Honor, Village of Village of Holly Village of Holly Village of Holly Ellsworth, Village of

Sewer Separation & Stormwater Sewer Lift Station Upgrades Sherman St. Watermain Sherman St. Watermain Watermain upgrades Wastewater Treatment System

Complete system watermain loop from Kaliseum to Kalkaska School 5/1/2010 Updgrade three sanitary sewer lift stations 5/1/2010 Intersection repairs to pavement surface & widening 5/1/2010 Remove stormwater from sanitary sewer for Downtown from Fourth St to Third St and municipal parking lot. 5/1/2010 New pumps are needed for 3 sewer lift stations to gain energy efficiency 6/1/2009 Upgrade to 8" watermain from Cogshall to College on Sherman Street Fall of 2009 Upgrade to 8" watermain from Cogshall to East on Sherman Street Fall of 2009 Upgrade to 8" watermain on Lakeview, Seminole and Rosette Streets Fall of 2009 5/1/2010

Village of Ellsworth Village of Elk Rapids

Ellsworth, Village of Elk Rapids, Village of

C-48 Road Improvements Municipal Well & Street to Water Hook Up

5/1/2010

Village of Elberta

Elberta, Village of

Waterfront Mixed-Use Redevelopment

T O

6/1/2009 4/1/2009

Village of Beulah

Beulah, Village of

Water Main & Tank System Upgrade

Village of Bellaire

Bellaire, Village of

Water Line

Village of Bellaire

Bellaire, Village of

Federal Aid Road Reconstruction

Reconfiguration of Derenzy Road- the only road to the County Airport from the Village 6/1/2009

Village of Bellaire Village of Bellaire

Bellaire, Village of Bellaire, Village of

Lagoon Repair Warner Bridge

Lagoon repair- our lagoon banks are eroding and need to be lined and stablized Repair and reconditioning of Warner Bridge

Turning Point

Tompkins Township

t i m

b u S

Mt. Clemens

Green Shelter Project

Tompkins Center, Jackson County, Michigan Tompkins Twp. Hall Renovations

02262009

-N

11/30/2010 11/30/2010 11/30/2010

$ $ $

11/30/2010 9/1/2009 Fall of 2009 Fall of 2009 Fall of 2009 1/1/2011

$ $ $ $ $ $

9/1/2009 11/1/2009

$ $ $

1,500,000

$

1,600,000

$

300,000

D VE

5/1/2010

$

2010 2009

$ $

90,000 146,000

Turning Point is planning to build an emergency shelter with a sustainable design in downtown Mt. Clemens that will increase our capacity to serve those seeking emergency shelter by 50%, and also address the inadequacies of our current facility. Turning Point is one of only four shelters in the metropolitan Detroit’s tri-county area Extensive dedicated to eliminating domestic violence.Last year alone Turning Point was unable planning has to meet over 2,000 requests for emergency shelter. After extensive planning for the already started. Site approval, past three years Turning Point purchased a vacant building two doors south of our design, property existing shelter. The building is 5,000 square feet and adjacent to our existing purchase etc. The children’s play yard. Our plan is to renovate the interior of the building and add an estimated 12,000 square feet of residential living space, resulting in an 18,400 square start date is depending on feet facility. The design plan has 14 flexible suites and 2 efficiency apartments raising 2/3of the allowing families’ privacy in their bedrooms, and increases programming and children’s spaces. Turning Point’s plan for a sustainable emergency shelter will be the dollars needed to first registered LEED project built in Mt. Clemens, which serves as the Macomb Count begin.

construction companies estimate an 18 month construction time table. $

2,000,000

Replace exterior doors, windows, first level floors, walls and ceiling. Add insulation where applicable without major renovation. Replace sinks and toilets in two bathrooms.Replace light fixtures.

July/August, 2009

q e R

Submitted Requests - Not Approved

2009 2009

April/May, 2009

Route (Infrastructure Only)

95,000 US-131 N of M-72 M-72 and Kalkaska 250,000 Rd 425,000 520,000 US 131 and M-72 Third & Fourth 550,000 Streets 450,000 102,000 200,000 252,000 3,500,000 C-48, federal aid 430,000 road 1,200,000

7/1/2009

e u

d e tt

$

5/1/2009

Project has been ready for 2 years, but can't proceed without funding. Water main construction is 4 month project. Water tank construction is a one year project. Large tank will provide additional cycling and the water main transmission upgrade will result in more efficient use. 5/1/2009 Water Line Project - many of our water lines on the state highway were put in during the early 1930's and need to be replaced and repaired Unknown

Funding Request

11/30/2010

O R

P P A

3rd municipal well and street to water hook up needed Sewer/water infrastructure improvements including replacement of an existing lift station to address future Waterfront District redevelopment.

s t s

Expected Completion Date

$

60,000 Derenzy Rd.

50,000

968 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Building acquisition for lease to an electronic waste processor deploying state-of-theart electronic scrap and glass recovery equipment.Located at 19800 Eight Mile Road in Southfield is a mostly vacant building, which was formerly the world headquarters o Detroit Optical Centers (DOC). The facility is approximately 45,000 square feet and is adjacent the material recovery facility (MRF), owned by the Resource Recovery and Recycling Authority of Southwest Oakland County (RRRASOC). RRRASOC has been working with an electronic waste recycler, Classic Computer Recovery (CCR), that is interested in locating in the building. The operation would include electronic scrap demanufacturing and a state-of-the-art “glass to glass” (G2G) recovery process for the leaded glass in televisions and computer monitors, the latter of which is not currently available in Michigan. 7/1/2009

Resource Recovery and Recycling Authority of Southwest Oakland County Southfield

Building Acquisition for E-Waste Processing

Northwestern Michigan College Traverse City

The Eco-Learning and Transit Hub involves a 40,000 gross square foot renovation and repurposing of a Leeds Platinum Student Learning Center and Transit Hub. The project will interconnect the five college campuses via four biodiesel/electric-powered buses and include the construction of transfer stations at these sites. In conjunction with NMC’s Energy Demonstration Center, operations of the building will be used as an academic “green project” to certify a green-ready workforce. Student Learning Center (SLC)—The SLC will hold classrooms, a full complement of student services, bookstore and campus dining to serve the 5-campus NMC student population. Renovation will incorporate Leeds Platinum technology, including: solar/wind turbine driven geothermal heat pumps; lighting control system programmed to compensate for daylight levels and to turn lights on or off depending on whether rooms are occupied; ventilation delivered to occupants from the floor, not the ceiling, which Northwestern Michigan College Eco-Learning increases occupant comfort and saves energy; and close access to public bus stops. 120 days from & Transit Hub In addition to energy efficiency, maintenance of the Student Learning Center will provi approval

Missaukee County

Missaukee County

Missaukee County

Missaukee County

2,550,000

2 years

$

22,500,000

Energy Conservation Infrastructure projects include: Installation of a building management system and HVAC upgrades designed to control heating, air conditioning, and lighting to reduce electrical consumption in all NMC facilities. This system will be tied into class scheduling software to maintain comfortable temperatures and adequate lighting levels only when rooms and buildings are in use. This project will result in an approximately 10 percent reduction in energy annual costs. Installation of geothermal and wind turbine technology at NMC’s University Center, Michigan-Technical Education Center, James J. Beckett Building and Dennos Museum Center to reduce consumption of electricity. Replace failing roofs, increase insulation, and retrofit roof drains on select buildings. Roofs will be replaced with white reflective roofing material, and insulation quantity and quality will be enhanced to maximize energy conservation during both heating and cooling seasons. Roof drains will be retrofitted so rain water can be harvested and recycled for site irrigation to 90 days from reduce potable water consumption. Replacement of existing windows with new energ project approval

18 months

$

4,800,000

Falmouth Rd., Hilbrand Rd., Cadillac Rd.

Approximately 3.00 miles of pulverizing, widening and repaving. Beginning at M66 then west 1.5 miles, then north 1.00 miles then west 0.50 miles to Dickerson Road.

7/1/2009

8/1/2009

$

475,000

Stoney Corners Rd.

Approximately 6.00 miles of resurfacing, beginning at M66 then west to the County Line.

5/1/09 as soon as weather permits 5/15/2009

$

500,000

Jenning Rd., LaChance Rd.

Approximately 8.00 miles of resurfacing, beginning at M66 then west 4.00 miles, then 5/1/09 as soon as south 1.00 miles, then west 3.00 miles to the County Line. weather permits 5/15/2009

$

550,000

d e tt

Missaukee County

Missaukee County

Missaukee County

Missaukee County

02262009

t i m

Northwestern Michigan College Energy Conservation Infrastructure

ub

Eight Mile Rd.

q e R

P P A

N s

st

Reconstruction and Improvement to All-Season standard.

Submitted Requests - Not Approved

6/1/2009

11/1/2009

Route (Infrastructure Only)

D VE $

e u

S

O R

Funding Request

9/1/2009

T O

Northwestern Michigan College Traverse City

Expected Completion Date

$

from Stoney Corners Road to M3,000,000 55 (10 miles)

969 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Manistee ISD

Manistee ISD

Manistee, City of

Manistee, City of

Project Name

Project Description

Expected Completion Date

Start Date

MISD Administrative Office Addition

Building addition of 1,200 square feet, housing two enclosed offices, two workstations and conference facilities. Includes energy efficient utilities, wind generator, Furnishings and Equipment. Project Cost Estimate - $ 375,000 5/1/2009

10/1/2009

MISD - Broadband

Provide broadband connection to outlying educational facilities in the county that are not currently served. Supports distance learning and training. Location:WSCC, Casman, MCC, Trinity, MAPS - $520,000 4/1/2009

6/1/2009

Manistee Area Public Schools Energy Conservation Project

Applying several Energy Conservation Opportunities (ECOs) to lower the Energy Cost Index (ECI) at all schools located within the district. Modifications to current infrastructure is based on an evaluation submitted by G-Energy in Jenison, MI. Lighting modifications include installing T8 fluorescent lighting, compact fluorescent lamps (CFLs) and occupancy sensors throughout all the buildings in the district. Single pane windows in the Middle School need to be upgraded through replacement, addingProject is ready to insulation, or overglazing the window area. A detailed engineering study will determinebe started as All energy projects the best option. Drinking fountain timers and the replacement of faucet aerators in all soon as funds can be completed sinks will dramatically reduce water usage. arise within a month $

500,000

Manistee Area Public Schools Asbestos Elimination Project

Application for the removal of a former High School and Middle school building that was built in 1924. Building is beyond renovation. Everything that could be reused was Project is removed from the building and implemented throughout other schools in the district currently shovel ready and can be including doors, desks, lockers, clocks, ceiling tiles, etc. Building poses a health concern due to the amount of asbestos within the building and a safety concern due tostarted in a matter its structural integrity. of weeks

It will take 3 months as a maximum estimate to tear down the building and clean the site after demolition $

1,000,000

Hangar & Terminal area sewer and water infrastructure

connection to the existing Howell Township sewer and water infrastructure to provide an area for future airport terminal building and private development of future hangars. The private hangar development is anticipated to create jobs for aircraft maintenance, pilots, and other related personnel. Fall 2009

Fall 2009

$

450,000

Construct a new airport terminal building on the north side of the airport. This is included in the 5 year development plan. The new terminal building is anticipated to provide facilities for a rental car concession as well as airport fuel and airport operations.

Fall 2010

$

1,000,000

Replace 500LF of water main in the Township's water system. This drinking water system upgrade will conserve water, net energy savings and improved water quality. 5/1/2009

10/31/2009

$

100,000

Includes 900 MHz radio monitoring and control system including towers, radios, and security camera equipment. The project is necessary to improve operating efficiency by reducing travel time, automate alarm reporting and increasing water supply security at two source locations. This upgrade would create travel conservation, reduced electrical consumption, improved water reliability and security. 5/1/2009 in cooperation with MDOT 7/1/2009 5/1/2009 5/1/2009 5/1/2009

6/1/2009 11/15/2009 9/1/2009 9/1/2009 9/1/2009

$

110,000

$ $ $

300,000 510,000 550,000

O R

Manistee Area Public Schools

Manistee Area Public Schools

Livingston County Airport

Manistee, City of

Manistee, City of

Howell Township, Livingston County

Livingston County Airport

Howell Township, Livingston County

Airport Terminal Building

Little Traverse Township

Little Traverse Township

Water Main Replacement

Little Traverse Township Leelanau County Leelanau County Leelanau County Leelanau County

Little Traverse Township: Emmet Heights well and reservoir at 7965 Emmet Heights Rd.; Harbor Cove well at 381 Harbor Drive West.; DPW operations center at 709 E. Hathaway Rd.; Twp. Hall records 8288 S. Pleasantv Water System Radio SCADA Network Leelanau County CR 651 and M-72 Intersection Leelanau County CR 640 Leelanau County CR 637 Leelanau County CR 677

tt i m

02262009

Funding Request

b u S

d e t

T O

P P A

N s

t s e

qu

e R

Submitted Requests - Not Approved

Fall 2009

Route (Infrastructure Only)

D VE

970 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Excelsior & Rapid River Kalkaska County Road Townships; Kalkaska Commission County Road Commission Resurface Twin Lake Road and CR571

Project Description

Expected Completion Date

Start Date

CR 571--HMA Ultra-Thin Overlay; approximately 2 miles from M-72 north to CR 612; Excelsior Township; T-27N, R6W. Twin Lake Road--HMA Ultra-Thin Overlay; approximately 4 miles from US 131 east to CR 571; Rapid River Township; T-28N, R7W; and Coldsprings Township; T-28N, R-6W. 5/1/2009

Crush, shape and repave approximately 2.2 miles of Twin Lake Road from Squaw Lake Road northwest to Sunset Trail; Blue Lake Township; T-28N, R-5W through sections 18, 19, 20. Crush, shape and repave approximately 1 mile of Starvation Lake Blue Lake & Coldsprings Road from Barnhart Road east to Coldsprings Township Line; Coldsprings Township; Kalkaska County Road Townships; Kalkaska Starvation Lake Road/Twin Lake Road Crush, T-28N, R-6W. The Kalkaska County Road Commission, along with the assistance of Commission County Road Commission Shape & Repave Blue Lake and Coldsprings Townships, has repaved all but 3.2 miles. 5/1/2009

6/30/2009

O R 6/30/2009

P P A

Apollo Hall Alumni Center (1937)

Interlochen Center for the Arts Interlochen

Fine Arts Classroom Building (1946)

The Historic Fine Arts building has served as a classroom for some of the greatest artists of our time, past and present. Today the Fine Arts building is still being used as a classroom and for performances and rehearsals. Essential updates include replacing the original floor, windows and doors (Green Project). Interior work includes renovations would electrical, plumbing, acoustical treatment, partitions for classes, and installation of begin upon cabinetry for art supplies and instrument storage. receipt of funding

Interlochen Center for the Arts Interlochen

Originally Kresge Auditorium was built for live performances that were completely acoustic in nature, did not require any type of amplification and needed only very simple lighting. Over the last several decades the nature of live presentation as changed dramatically. To continue to be a world class arts presenter, Interlochen Kresge Auditorium (1948, expansion in 1964) must invest in electrical and acoustical upgrades.

$

Starvation Lake/Twin Lake 600,000 Roads

$

30,000

September, 2009 at earliest; within two years for all projects

$

100,000

September, 2009 renovations would at earliest; within begin upon two years for all receipt of funding projects

$

150,000

September, 2009 at earliest; within two years for all projects

$

200,000

Braeside is one of Interlochen’s original structures and served as the first Camp cafeteria. Currently Braeside is used as the girls Camp recreation building. Necessary renovations include repairing the original foundation, replacing the roof and interior renovations would roof support structures, windows and doors, and major updates to the electrical and begin upon plumbing (Green Project). receipt of funding

September, 2009 at earliest; within two years for all projects

$

200,000

Contains the Culver Faculty Center, Stone Hotel, and the campus’ largest cafeteria—where a majority of the 9,000 summer meals a day are prepared. Over the last several decades many renovation projects have been completed, including recent updates to the hotel rooms. Replacing the Stone Student Center roof is a top priority to ensure recent upgrades are not damaged by a roof that is already leaking. renovations would Stone Student Center (1940, reconstructed in Additional needed renovations include replacing windows and carpeting, installing air begin upon conditioning, and modernizing the kitchen and dish-room (Green Project). receipt of funding 1958)

September, 2009 at earliest; within two years for all projects

$

250,000

tt i m

ub

d e t

Braeside girls recreation building (1928)

S

q e R

Twin Lake Road & 450,000 CR 571

The Maddy Administration building is the primary office building on campus. As the Center has grown, parts never intended for use have been converted to office space. For example, the basement was originally built for storage and has now been converted into office space. These Lower level offices need windows installed to fix inadequate ventilation and provide egress in case of emergency. Other critical updates include: reinforcing an aging roof structure to withstand heavy snow loads; adding insulation and improvements to heating, ventilation and air conditioning that wi renovations would allow for greater energy efficiency (Green Project); along with requisite electrical and begin upon plumbing work. receipt of funding

Maddy Administration Building (1952)

Interlochen Center for the Arts Interlochen

02262009

s t s

-N

e u

Interlochen Center for the Arts Interlochen

Interlochen Center for the Arts Interlochen

T O

$

D VE

September, 2009 Currently serves as the summer Alumni welcome center. Crucial structural repairs are renovations would at earliest; within needed to save this historic building, including roof support beams and major tuck begin upon two years for all pointing to save the exterior stone façade, which is crumbling. receipt of funding projects

Interlochen Center for the Arts Interlochen

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

971 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Interlochen Center for the Arts Interlochen

Project Name

Project Description

Expected Completion Date

Start Date

Lochaven Cafeteria (1953)

Lochaven serves as the summer cafeteria for the junior and intermediate boys Camp, serving over 1500 meals a day. As Interlochen continues to expand its programming to serve more people and hosts more conferences, special events, and programs, Lochaven needs to be converted into a year-round cafeteria. This includes winterizing renovations would the seasonal building and renovating the dining hall and kitchen for increased begin upon capacity, new roof and support struts, and foundation stabilization. receipt of funding

Outdoor Pavilion

A new outdoor facility to accommodate a wide range of performance and event needs including expanded summer Camp offerings, a segment of adult education programming, our growing need to connect with a large number of summer visitors, and our desire to showcase a new annual professional theatre initiative, the construction is Interlochen Shakespeare Festival, which made a resounding debut in 2008. We have scheduled to received gifts totaling $225,000. Drawings are available. This new outdoor facility will begin as soon as increase our ability to attract people to our campus, region and state; 250,000 visitors the remaining from all over the world already come to Interlochen each year positively impacting on $275,000 in funds our region’s hospitality economy. is available.

Interlochen Center for the Arts Interlochen

Summer faculty housing (1935-60)

We are in the process of renovating our summer faculty housing, and have about 25 residences left to update at a cost of $20,000 each. Since we have already completed several renovations of a like nature, details are available, as well as photos and other construction documentation. Essential renovations include repairing original foundations, replacing would begin upon roofs, and updating the electrical and plumbing (Green project). receipt of funding

Interlochen Center for the Arts Interlochen

A T

s

t s e

Interlochen Center for the Arts Interlochen

Student Housing Renovations

Green Lake Township Green Lake Township

Emergency Services Building

Green Lake Township Green Lake Township Grant Township Grant Township

US-31 / M-137 Intersection Nessen Road

$

375,000

September, 2009 at earliest; within two years for all projects

$

500,000

September, 2009 at earliest; within two years for all projects

$

500,000

Garfield Township

Garfield Township

Garfield Township East Bay and Garfield Townships

Garfield Township

S

First Step, Western Wayne County Project 4400 S. Venoy, Wayne, on Domestic Assault MI

02262009

u q e

September, 2009 at earliest; within two years for all projects

$

1,915,000

3/1/2010

$

1,425,000

install pedestrian safety features along with sidewalks, landscaping and lighting Nessen Road, Trench-widen-overlay-CL rumble strips

TBD

$ $

700,000 US -31 750,000 Nessen Road

$

Ingersoll Road from Puffer Road 625,000 to M-66 900,000 South Airport Road

Ingersoll Road Crush, Shape & Repave

Crush, shape and repave approximately 2 miles; Garfield Township; T-25N, R-7W through Sections 7, 8, 17, 18. Kalkaska Road Commission project.

South Airport Road

S. Airport Road, Resurfacing, Cass Road to US-31

$

Hammond Road

Hammond Road, Resurfacing, Three Mile Road to LaFrainer Road

$

ub

Garfield Township

A majority of the dormitories on campus are 40 years old or older. Major renovations to student housing include: installing fire suppression systems in the remaining three dormitories without sprinklers ($225,000); improving heating, ventilation and air conditioning systems and installing new boilers that will allow for greater energy efficiency ($500,000); adding siding to cover the exterior of the three cement block dormitories that will also improve energy efficiency ($390,000); and renovations to the flooring in dormitory hallways and rooms in 40 student areas ($800,000). Complete or partial funding assistance would allow Interlochen Center for the Arts to perform some renovations would of its most pressing capital improvements and devote its resources to the world’s begin upon most talented and motivated young artists that attend our boarding High School. receipt of funding Replacement of fire facility with an emergency services building located adjacent to present Township Hall 6/1/2009

R d

e t tt

i m

O N

D VE

September, 2009 at earliest; within two years for all projects

O R

PP

Funding Request

Replacing a dilapidated domestic violence shelter-The project would include adding energy efficient bedroom suites and program areas to an existing (new) building to Family Center (Emergency housing for victims accommodate 50 women, children and men who need safe shelter from domestic and/or sexual violenceof violence

Submitted Requests - Not Approved

5/1/2009

9/1/2009

Route (Infrastructure Only)

Can start within 90 days of funding Within one year of (or less) full funding $

2,100,000 Hammond Road

5,500,000

972 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

First Step, Western Wayne County Project on Domestic Assault Wayne, MI

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Transitional housing unit for victims of violence purchase and renovate 6-8 unit apartment building for transitional housing (upgrade in Wayne County for energy effeciency)

Can Start within 120 days of funding (or less)

Within one year of full funding $

500,000

First Step, Western Wayne County Project on Domestic Assault Plymouth MI

Energy Program Retrofit

Can Start within 120 days of funding (or less)

$

50,000

First Step, Western Wayne County Project on Domestic Assault Wayne County

Hybryd vehicle for client transportation and donation pick-up

$

50,000

unknown

$

3,000,000

9/1/2009

$

500,000

Filer Township Fenton Area Public Schools Fenton Area Public Schools

Fenton Area Public Schools Fenton Area Public Schools Emmet County Road Commission Emmet County Road Commission Emmet County Road Commission Emmet County Road Commission Emmet County Road Commission Emmet County Road Commission

Filer Township

O R

P P A

Essential to address development opportunities and job creation in Filer Township, in collaboration with the City of Manistee and other interests, including private developers. unknown Renovate 10 small classrooms in an existing building to accommodate the transition of 5 developmental kindergarten classes into all-day programs. 6/9/2009

D VE

Sewer/Water Infrastructure Development Fenton Area Public Schools-Preschool/K building renovation Fenton Area Public Schools-High School building

Complete a pipe replacement project at the high school building.

6/9/2009

9/1/2009

$

220,000

Fenton Area Public Schools-High School Chemistry and Foods Labs

Create additional Chemistry classroom and lab space to accommodate the new high school graduation requirements. Create a foods lab at the high school to provide an opportunity for all students to meet new technology standards in a hands on environment. 6/9/2009

9/1/2009

$

360,000

Fenton, Michigan 48430

FentonArea Public Schools-Preschool/K building renovation

Overhaul the existing HVAC system in an existing building to accommodate the development of a preschool through K program inclusive of all day developmental kindergarten and all day kindergarten programs.

6/9/2009

9/1/2009

$

2,000,000

Emmet County

Emmet County Road Commission

Replace deteriorating metal/concrete bridge deck with timber deck and rails

5/1/2009

8/1/2009

$

Emmet County

Emmet County Road Commission

resurface West Conway Road from Clayton Road to Heydey Street.

5/1/2009

8/1/2009

$

Maple River Road 300,000 Bridge West Conway 390,000 Road

Emmet County

Emmet County Road Commission

resurface State Road (C-77) from Harbor Springs to Middle Road

5/1/2009

8/1/2009

$

400,000 County Road C-77

Emmet County

Emmet County Road Commission

5/1/2009

8/1/2009

$

470,000 County Road C-58

Emmet County

Emmet County Road Commission

resurface Mitchell Road (C-58) from Division Road to Maplewood Road replace 80 year old, inefficient road commission garage with new energy efficient building to house trucks and other equipment.

4/1/2009

11/1/2009

$

500,000 Levering Garage

Emmet County

Emmet County Road Commission

resurface Pleasantview Road (County Road C-81) from M-119 to Nubs Nob Road

5/1/2009

8/1/2009

$

604,000 County Road C-81

Project: Build upon Emmet County’s success in Residential & Commercial Curbside Recycling by expanding curbside collection to include source separated organics and yard waste. We are requesting funds to: 1) Improve the infrastructure of our compost facility to adequately handle food waste composting and 2) Start up a pilot organics collection program for residents and businesses for Spring 2009. Timeline: January 2009 Develop Equipment specifications; February 2009 Bid equipment, expand contracts and service districts; March 2009 Award Bids. Promotion & Education; April 2009 Receive Equipment. Begin accepting food waste for Drop-off; May 2009 Begin pilot collection in one municipality and expand to others. 5/1/2009

5/1/2010

$

454,000

Fenton, Michigan 48430 Fenton, Michigan 48430

Fenton, Michigan 48430

b u S

Petoskey & Harbor Springs. Resort, Little Traverse & Bear Creek Townships

02262009

T O

s t s

-N

e u

eq

R d

e t t

t i m

Emmet County

Energy Efficient windows, doors, insulation, appliances, weatherization

Route (Infrastructure Only)

Building Organics Waste Diversion & Collection Infrastructure in Emmet County

Submitted Requests - Not Approved

973 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Emmet County

Project Name

Project Description

Start Date

Expected Completion Date

Harbor Springs, Little Traverse Township (facility), service area to include Petoskey, Harbor Springs, all Emmet County up to Mackinaw Building Commercial Recycling Collection City, with potential expansion into Cheboygan Infrastructure in Emmet & Neighboring and Charlevoix Counties Counties

Project: Build upon Emmet County’s success in Commercial Curbside Recycling by expanding it to include cardboard collection to greatly increase diversion from the waste stream. Emmet County provides weekly curbside collection of recyclables (excluding cardboard) for over 200 businesses within the county. Most of these businesses and many others have requested cardboard collection for recycling due to no service or inadequate service from their private solid waste hauler. Cardboard can account for 70% of business waste. A Cardboard Commercial Collection Program was outlined in the Emmet County DPW.’s 2005 Business Plan slated for 2008 implementation. Two front load compaction trucks would service an initial 400 frontload containers distributed to businesses, institutions, and industries in the Emmet County region, with potential to expand into neighboring counties. Emmet County Recycling's success with Commercial Recycling Collection, which includes a long waitlist for cardboard collection, ensures success in this project, providing green jobs in trucking, processing and manufacturing. 2/1/2009

Harbor Springs/Little Traverse Township East Bay Township

Emmet County plans to expand its Recycle Facility to quadruple its capacity from 7,500 to 30,000 tons per year to provide processing for curbside, commercial and drop-off recycling collections in Emmet and surrounding counties.This proven facility is well-poised to expand processing with design and engineering well underway. Designed for dual-stream processing, it will have the ability to upgrade to a single stream facility in the future if warranted. This 20,000 sq. ft. facility expansion will build on an already successful recycling program, where over 30 items are accepted for recycling, and recyclables are currently received from six neighboring counties. Recycling provides one of the lowest cost options for greenhouse gas reduction and results in a high job-to-investment ratio compared to other industries. The only publicly owned and operated facility north of Mt. Pleasant in the lower peninsula, this expanded facility could serve the entire region's recycling needs for residential and commercial recycling into the forseeable future, creating green jobs in Michigan's manufacturing and transportation sectors. Our recyclables are the raw materials for M5/1/2009 Three Mile Road, Widening, S. Airport to Hammond

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

8/1/2009

$

900,000

4/1/2010

$ $

4,572,926 4,200,000

$

675,000

N s

Emmet County East Bay Township

DeWitt Township

Emmet County Recycling Facility Three Mile Road

DeWitt Charter Township Brownfield redevelopment in southern tier

d e tt

t s e

qu

e R

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area 2010

it

m b u

S DeWitt Township

39973

02262009

Expansion of Public Water in Southern Tier

DeWitt Charter Township

Submitted Requests - Not Approved

10/10/2009

$

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and 3,500,000 expand this area

974 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DeWitt Township

Project Name

Project Description

Start Date

Expected Completion Date

DeWitt Charter Townships Fire Station One is in need of major repairs. A study is currently being done to determine if it is more cost effective to remodel the building or build a new one. The building needs many expensive repairs and is not energy effici 2010

DeWitt Charter Township New Fire Station

$

O R

DeWitt Township

39881

Sewer Master Plan

T O

DeWitt Charter Township

s t s

-N

Funding Request

Yes

$

DeWitt Charter Township sewer system is 30 years old in many areas. The system is aging and is in need of repairs. We have completed a collection system rehab plan, but have not evaluated the complete deficiencies in our system. We are in 250,000 the need of revi

$

Over the last number of years the Township has put significant dollars into remodeling our community Center. The only project not completed was replacement of the energy inefficient 40,000 windows.

e u

DeWitt Township

39912

d e t

Community Center window replacement

tt i m

q e R

DeWitt Charter Township

10/9/2009

x

1,500,000

D VE

P P A 10/9/2009

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

975 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

DeWitt Township

40034

Elimination of pump station 108

T O

DeWitt Charter Township

P P A 10/10/2009

Funding Request

D VE $

Station #108 is operated by DeWitt Charter Township. This 36 year old station constructed in 1972 is past its anticipated useful life. Located in close proximity to a heavily trafficked intersection, it is at risk for damage and failure from 250,000 traffic accid

$

Station #504 is jointly operated by DeWitt and Bath Charter Townships. This 31 year old station constructed in 1977 pumps a daily average of 0.71 MGD. 100% of Bath Township’s sewage (.6085 MGD) and approximately 7% of DeWitt Township’s sewage 2,000,000 (0.1 MGD) ar

N s

t s e

u q e

DeWitt Township

40034

e t t

R d

Upgrade pump station 504

t i m

DeWitt Charter Township

10/10/2009

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

976 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

DeWitt Township

40034

Upgrade pump station 501

T O

DeWitt Charter Township

DeWitt Township

40034

d e tt

t i m

Bath Waste Water Interceptor Replacement

D VE $

Station #501 is jointly operated by DeWitt and Bath Charter Townships. This 31 year old station constructed in 1977 pumps an approximate daily average 1.61 MGD. 100% of Bath Township’s sewage (.6085 MGD) and approximately 83% of DeWitt Township’s sewage 200,000 (

$

All of Bath Township wastewater runs cross country through DeWitt Township. This line that runs next to the a major Remychandler. Inspections of the line have found major areas of concern that must be addressed before they cause a problem. If this 3,500,000 occurs

P P A 10/10/2009

N s

st

e u

q e R

Funding Request

DeWitt Charter Township

10/10/2009

Route (Infrastructure Only)

b u S 02262009

Submitted Requests - Not Approved

977 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

O R

DeWitt Township

40034

Water main extension for freight building development

DeWitt Charter Township

P P A 10/10/2009

T O

Funding Request

D VE $

To facilitate future development on the Airport extend water main to new freight building. This is a project critical to the Greater Lansing Region because it will allow the airport to open its port of entry and fair trade 650,000 zone

$

To Facilitate future development on the Airport redirect Sanitary sewer lift station for new freight building. This is a project critical to the Greater Lansing Region because it will allow the airport to open its port of entry and fair trade 1,500,000 zone

$

The Capital International Airport will be relocating the passenger terminal to an area at the intersection of DeWitt Road and State Road. In conjunction with the terminal relocation, approximately 100 acres of commercial and industrial property, 2,155,000 adjacent

N s

t s e

DeWitt Township

40034

Airport redirect Sanitary sewer lift station

u q e

DeWitt Charter Township

10/10/2009

R d

e t t

t i m

b u S DeWitt Township

40003

02262009

Waste Water Collection system capacity/reliability upgrade

DeWitt Charter Township

Submitted Requests - Not Approved

12/9/2009

Route (Infrastructure Only)

978 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

O R

DeWitt Township

DeWitt Township

DeWitt Township

DeWitt Township

Wastewater Collection System Extension North Business 27 Corridor

40003

39881

Extension of Coleman Rd

T O

DeWitt Charter Township

P P A

N s

City and Township

12/9/2009

9/9/2009

DeWitt Charter Township BR127 streetscape improvements

DeWitt Charter Township has recently completed its South Central Area Plan. This urban area in the Township has faced significant decline in the last decade. The South Central Area Plan defines ways in which the Township can stabilize and expand this area 2010

D VE $

x

t s e

DeWitt Charter Township Widening of State Road

The Capital International Airport will be relocating the passenger terminal to an area a the intersection of DeWitt Road and State Road. In conjunction with the terminal relocation, approximately 100 acres of commercial and industrial property, adjacent 2010

Funding Request

City of Watervliet

City of Watervliet

$

$

5,700,000

u q e

Water service replacement due to rehabilitation of M-140 (by MDOT in 2010) through the City including the downtown commercial district. As part of this project, there would be in excess of 30+ water service(s) that would be replaced supplying the downtown commercial district. The services are very old with a number that are lead services. Replacement of the water service(s) is being done ahead of the rehabilitation of M-140 so the City does not have to "after the fact" tear-up the work 5/1/2009 subject completed by the MDOT on the newly done roadway. to funding

9/1/2009

$

M140 & Red Arrow 125,000 Hwy.

Medical Drive

The City is home to an award winning regional serving community public hospital. The project would entail redevelopment of the ingress/egress and drive off of Red Arrow 3/1/2009 subject Hwy. (including storm retention) to the hospital proper. to funding

9/1/2009

$

570,000 Red Arrow Hwy.

11/1/2009

$

M-140 & Red Arrow Hwy., connecting both north/south and east/west sides of 2,040,000 the City

11/1/2009

$

e t tt

i m

M-140

ub

City of Watervliet

S City of Watervliet

City of Watervliet

Non-Motorized Paths

Multiple components brought together to create connectivity within the downtown commmercial district and the City proper. Sidewalks, walking paths, boardwalks, crosswalks, lighting, benches, trash recepticles, landscaping, and signage. Overall goal is to have a very user friendly City where people can walk versus driving in their cars 2-3 blocks. Also, necessity of children having ability to exercise and addressing 5/1/2009 subject safety concern of kids walking in streets. to funding

City of Watervliet

City of Watervliet

City Hall-police department

Rehabilitation of the police department HQ within City Hall. Facilities are extremely antiquated and functionaly obsolete.

02262009

The Business 27 corridor, north of the I-69 interchange, has experienced significant economic development over the past five years, the latest being the opening of the Meijer store in 2007. The extension of sanitary sewer north of the 750,000 currently developed

Extension of Coleman Road between Wood Road and West 4,000,000 Road

R d

City of Watervliet

Route (Infrastructure Only)

Submitted Requests - Not Approved

5/1/2009 subject to funding

50,000

979 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

City of Watervliet

City of Watervliet

City Hall-windows

Replacement of City Hall windows for energy savings/effeciancy. The City Hall is an 3/1/2009 subject historic building with 80 year old single pane windows. to funding

5/1/2009

City of Watervliet

City of Watervliet

City Hall-heat

Replacement of City Hall boiler heat system. The boiler system and the localized heating units are 40 years + old.

3/1/2009 subject to funding

5/1/2009

City of Watervliet

City of Watervliet

City Hall-back-up generation

New back-up generation system to be installed at City Hall. The community is vulnerable if City Hall were to be shut down from power outage.

3/1/2009 subject to funding

5/1/2009

Rehabilitation of the public works building for heat system and insulation. Building has forced air heating with the need to replace it with radiant heat. Building has negligable3/1/2009 subject insulation creating significant heat loss to funding install 300,000 gal Water Tower to be located in the City industrial park open

Funding Request

$

20,000

D VE $

20,000

$

50,000

5/1/2009 12/31/2010

$ $

35,000 750,000

12/31/2010 60 to 90 days

$ $

9/1/2009

$

130,000

6/1/2010

$

1,000,000

10/1/2009

$

581,500

7/1/2009

10/1/2009

$

650,000

O R

City of Watervliet City of Reading

City of Watervliet City of Reading

City Public Works-heat & insulation Water Tower

City of Reading City of Petersburg

City of Reading City of Petersburg

Chestnut St. North Saline St. Sidewalk Project

City of Manistee

Manistee, City of

6th Avenue Pump Station

City of Manistee

Manistee, City of

Jones Street Sewer Separation

City of Manistee

Manistee, City of

119 HUD Units

replace 109 year old water main and 96 year old storm sewer from fire department to high school then to the distribution system at south end of Chestnut St. open Curb,Gutter, and Sidewalk repair and restoration Spring 2009 Replace undersized pump station serving a state prison, a community hospital and the north side of the City. Required by MDEQ. 7/1/2009 Eliminate combined sewer, required by 2011. Enables Brownfield redevelopment to a "Cool Cities" neighborhood. 9/1/2009 Flood proofing. Federal regulations require public housing that is safe and free of hazards. 8/1/2009

City of Manistee

Manistee, City of

River Bank Sewer Project

Replace/protect 60-year old interceptor sanitary sewer line along river serving state prison and community hospital. Failure would threaten Manistee River.

City of Manistee

Manistee, City of

Manistee River Harbor, Dredging & Maintenance

This infrastructure is of immense importance to the City and the 700+ jobs that are reliant upon commerical navigation. This is a U.S. Army Corps of Engineer project.

4/1/2009

5/1/2009

$

500,000

Frankfort, City of

LED lighting will enable the City to achieve a 2/3 savings and reduced usage of electricity and extend the bulb life substantially, thus reducing overall operation and maintenance expense. Alternatively, this project could involve street light retro-fit (instead of fixture replacement); however, current streetlights are not water tight and emit light sideways, not downward. This alternative option would cost $72,100, but LED Ballast and Fixture Replacement to Main would not help the City realize cost savings associated with maintenance, would not Street Streetlights provide as high a quality of lighting, nor preserve the "dark sky". 4/1/2009

5/1/2009

$

175,100

11/1/2009

$

504,315

City of Frankfort

itt

City of Frankfort

m b u

Frankfort, City of

Launch Ramp

d e t

T O

s t s

-N

e u

q e R

P P A

The Boat Launch Enhancement plays a vital role toward maintaining our number one industry: tourism. The City of Frankfort has secured $113,250 and $99,000 from MDNR and HUD, respectively. A balance of $292,065 is needed to complete the project. Project components are: parking lot improvements ($180,995), "T"-upgrade to loading dock ($20,900), additional boat launch ramp with dock ($129,830), building upgrades ($77,660), and miscellaneous refurbishing/landscaping ($29,150). 4/1/2009

Route (Infrastructure Only)

1,467,719 north to south 80,000

S 02262009

Submitted Requests - Not Approved

980 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

City of Frankfort

Frankfort, City of

Revitalization of City of Frankfort Water, Sewer & Road Infrastructure System

City of East Jordan City of East Jordan

East Jordan, City of East Jordan, City of

Maple Street Water/Sewer Fire/EMS Building

City of East Jordan City of East Jordan City of East Jordan City of East Jordan City of East Jordan

East Jordan, City of East Jordan, City of East Jordan, City of East Jordan, City of East Jordan, City of

Vance & Pine Street Reconstruction and Infrastructure Harbor Dredging Watermain Under Jordan River Bridge Harbor Electric Street Reconstruction Project

City of East Jordan

East Jordan, City of

Culvert Replacement Mill Street

Expected Completion Date

Start Date

Water and sanitary sewer mains pre-date 1950. The existing water main is undersized at a diameter of 4 inches, which does not meet state standards, including MDEQ standards. Sewer mains are clay-tile and are not able to handle stormwater runoff; in addition, ground water infiltrates through pipe joints and manholes. The City has completed Phase I of a water/sewer replacement project. Phase II will commence in spring 2009 with a total project budget of $904,282. Other construction activities are needed for Phase II, including street system and sidewalk improvements. This revitalization project is needed to enable the City to enhance social and economic wellbeing through Smart Growth, be desirable for private development, and stimulate the short- and long-term economy through construction jobs now and new residential and commerical growth in the future. 4/1/2009 Install new Water and Sewer Lines as well as Sewer Lift Station in Conjunction with MDOT Project 9/1/2009 To Construct a New Fire/EMS Building 8/1/2009

T O

P P A

Reconstruct Pine and Vance Streets. Deepening and Replacing Water and Sanitary Sewer. Install New Storm Sewer. New Road surface with wedge curb and gutter Dredging of the Harbor Replace 8" Water Line under Jordan River Bridge Replace current electric at Harbor Pave, Crush and Shape Various City Streets To Replace Culvert under Mill Street which is for Brown's Creek feeding the Jordan River

N s

t s e

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2010

$

17,577,497

12/1/2009 5/1/2010

$ $

800,000 4,000,000

7/1/2009 4/1/2009 7/1/2009 4/1/2009 6/1/2009

10/1/2009 6/1/2009 8/1/2009 6/1/2009 8/1/2009

$ $ $ $ $

M-66 to Elizabeth 600,000 St. 75,000 80,000 125,000 300,000

7/1/2009

8/1/2009

$

300,000

The Charlevoix Municipal Airport currently has a waiting list of approximately 10-12 airplane owners who are looking for aircraft hangar space. The City has no additional hanger space to offer to pilots with the current hangars beginning to reach the end of their useful life. Federal dollars could be used to construct new hangars with immediate occupancy for most of the new hanger space. The hangar space would create an additional revenue stream for the airport that would further assist to make the airport self-sufficient. Proposal is to build two hangar complexes that would house 15 additional aircraft (ranging in size from small, single engine planes through larger multi-engine and small corporate jets). This would provide about 35,000 square feet of new hangar space on City-owned land. Funding for project would be a strong Project will investment into sustainable air travel, a key economic development component in commence in northern Michigan. summer of 2009

Completion expected in Spring of 2010 $

The City of Charlevoix has recently executed an agreement with the Charlevoix School District collaborating on the installation of a joint fiber optic line though the community. Installation of the expanded joint fiber bandwidth will benefit both the City and School District allowing for video conferencing, added phone functionality, improved information flow, ability to monitor lift stations and promote radio read meters. In early 2009 the main fiber backbone will be complete with individual fiber cables to City buildings set to be installed in late spring/early summer of 2009. Furthermore, the City is in discussions with the local business community on ways tha the private sector could connect to, and benefit from, the expanded fiber optic network. To this end, the City requests funding for installation of the individual fiber lines serving five City buildings along with the Municipal Airport and Industrial Park. Funding would promote additional fiber lines to be installed in close proximity to our downtown area, airport and Industrial Park serving as a key component to recruit and retain much needed employers to our community. Offering the expanded fiber optic n Spring of 2009

Fall of 2009

u q e

City of Charlevoix

Charlevoix, City of

R d

e t tt

Construction of Airport Hangars at Municipal Airport

i m

b u S City of Charlevoix

Charlevoix, City of

02262009

Fiber Optic Network Extension

Submitted Requests - Not Approved

$

Charlevoix 1,900,000 Municipal Airport

138,000 City of Charlevoix

981 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Charlevoix

Charlevoix, City of

Project Name

Project Description

Start Date

The construction of the Clinton Street Water Main Loop will greatly contribute to a more reliable water source whereby increasing fire protection in Charlevoix’s densely populated downtown area. Scope of the project is approximately 450 l.f beginning at Bridge Street and terminating at State Street. The project is consistent with the City’s efforts to loop main water lines throughout the community. Additionally, the street pavement on this well-travelled stretch of Clinton Street is deteriorating and will be repaved after installation of underground utilities. Based upon inspections done by City engineers, the water lines in this area are extremely old and deteriorating and need to be replaced as soon as possible. The total estimated costs of the project would be $115,340, with an estimated $96,922 attributed to street reconstruction and Mid-April early Clinton Street Road and Utility Improvements drainage and $18,418 attributed to a new water line. May of 2009

O R

P P A

9/1/2009

N s

Charlevoix, City of

Building Efficiency Improvements

Charlevoix, City of

Recently the City of Charlevoix has installed new LED Christmas lights on our downtown trees. The LED lights use substantially less electricity saving the City in energy costs while reducing the City’s carbon footprint. The downtown lighting project has been extremely well-received by residents and visitors alike and continue our efforts to be an environmental leader within our community. Furthering these efforts is a proposal to upgrade and improve the City’s Municipal Airport lighting (runways, taxiways, parking lights and general facility lighting) towards the newer LED and Project will ‘greener’ lighting options available. The new technology that exists could save as commence upon much as 30%-40% from our current energy usage and therefore have a long-term receipt of federal Installation of LED Lights at Municipal Airport cost saving and pay back. funding. 9/1/2009

Funding Request

D VE

In June of 2008 the City of Charlevoix in partnership with U.S. Energy Engineers, completed an energy audit for five City buildings- 1)City Hall, 2)Fire/EMS Department, 3)Mt. McSauba Ski Hill, 4)Water Treatment Plant, 5)Wastewater Treatment Plant. The audit was a result of the City’s on-going environmental efforts to create more efficient buildings by reducing both energy consumption and the City’s overall carbon footprint. Improvements and estimated costs per energy audit include: Installation of occupancy/daylight sensors ($15,000), updating lighting ($31,085), installing new and Project will more efficient HVAC systems in Water/Wastewater Treatment Plants, Street commence upon Department and Ski Lodge ($55,000), new heating in Fire/EMS vehicle bays receipt of federal ($15,414), funding. Fall of 2009

T O

City of Charlevoix

Expected Completion Date

Route (Infrastructure Only)

$

Clinton Street from Bridge Street to 115,340 State Street

$

Five City buildingsCity Hall, Water Treatment Plant, Wastewater Treatment Plant, Fire/EMS, Ski Hill 116,499 Lodge

$

Charlevoix 300,000 Municipal Airport

$

Charlevoix 510,000 Industrial Park

t s e

City of Charlevoix

u q e

R d

e t tt

i m

City of Charlevoix

b u S

Charlevoix, City of

02262009

Industrial Park Underground Electric Circuit Construction

The construction of a new three-phase underground electrical circuit from the Meech/Dixon intersection to the Mercer/Division intersection and then to the Industrial Park Substation will greatly improve the reliability of the electric system both in the Industrial Park and also for the whole north side of the City of Charlevoix. The City has recently faced the possibility of losing a large customer in the Industrial Park due to reliability concerns. Completion of the three-phase project would add a feeder circuit that would allow alternate feeds to the Industrial Park as well as alternate feeds to the rest of the electric system on the north side of the bridge. This would mean a potential outage of several hours would be reduced to a few minutes. Rectifying this on-going electrical infrastructure issue will greatly assist the City of Charlevoix to maintain current employers in the Industrial Park promoting job retention and recruitment to a sagging manufacturing economy. Spring of 2009

Submitted Requests - Not Approved

Fall of 2009

982 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Charlevoix

Charlevoix, City of

Project Name

Project Description

Start Date

Park Avenue Road and Utility Improvements

Park Avenue reconstruction and underground utility work from Bridge Street to Lake Street (approximately 3,350 l.f.). $685,989 attributed to street reconstruction and drainage and $190,709 attributed to water and sewer lines. The main benefits to this project would be to improve one of the most deteriorated and frequently travelled roads in the City. Park Avenue serves as the main thoroughfare to the local hospital and the community’s most popular beach. It would improve water flows for fire protection, replace a section of sanitary sewer that has substantial root intrusion, radial and longitudinal cracking, and offset joints and improve drainage along the roadway. As Park Avenue runs parallel with Pine River Channel and Lake Michigan, stormwater filtration systems will be installed to filter out sediment and any contaminants from runoff whereby increasing efforts to maintain high water quality in Mid-April early Lake Michigan, Round Lake and Lake Charlevoix. May of 2009

State Street Road and Utility Improvements

The construction of the State Street Water Main Loop will greatly contribute to a more reliable water source whereby increasing fire protection efforts. Scope of the project is approximately 3,600 l.f beginning at Park Avenue and terminating at Carpenter Avenue. The project is consistent with the City’s efforts to loop main water lines throughout the community. Additionally, the pavement on this highly- travelled stretch of State Street is deteriorating and will be repaved after installation of underground utilities. Based upon inspections done by City engineers, the sewer lines in this area are cracking with offsets in joints. The utilities in this area are extremely old and deteriorating and need to be replaced as soon as possible. $855,812 attributed to Mid-April early street reconstruction and drainage and $408,137 attributed to water and sewer lines. May of 2009

Charlevoix, City of

Cadillac, City of

City of Cadillac

Cadillac, City of

City of Cadillac

Cadillac, City of

City of Cadillac

u S

Cadillac, City of

d e t

City Well Field Relocation

itt

9/1/2009

$

State Street from Park Avenue to 1,263,949 Carpenter Avenue

The City of Cadillac's municipal well field is nearly 50 years old. Several of the wells have had to have substantial maintenance performed within the last year to keep them operational. Additional wells are showing signs of age. This threat to the City’s municipal water supply will be addressed by a new well field. This well field will need to be relocated, and several sites are being explored and the viability of several options studied. The project is estimated to cost $4,500,000 and includes all wells, the infrastructure required for pumping, etc., well houses, electrical and control systems related to the new system, and all other aspects of the relocation project. The foundational work has begun for the project already, but design work is only conceptual at this point. 7/1/2009

7/1/2010

$

4,500,000

st

q e R

s

PP

9/1/2009

O N

Wexford-Missaukee ISD Multi-Purpose Meeting Room Wexford-Missaukee ISD Parking Lot Resurfacing

Construct a 2,500 square foot multi purpose meeting room on our campus. Currently all of our staff and/or students can not meet in any one place in our facilities. This room would be open for use by the community, as well as state and local groups. 9/1/2009

12/31/2010

$

750,000

Our parking lots require resurfacing to extend their useful life.

6/1/2009

8/31/2009

$

45,000

Wexford-Missaukee ISD Special Services Roof Replacement

Replace roof on special services building. Existing roof is well past expected useful life. On-going repair costs necessitate replacement of this roof. We hope to realize heating and cooling efficiencies with a new and better insulated roof system.

6/1/2009

8/31/2009

$

200,000

10/1/2009

$

135,000

9/9/2009

$

Lynn-Hersey 239,000 Streets

bm

City of Cadillac

Cadillac, City of

North Simons Street & Water/Sewer Reconstruction

This project would reconstruct a highly-traveled residential street. This street is in very poor condition as is the underlying water and sewer infrastructure. Street construction costs are estimated at $70,000 with an additional $65,000 estimated for Utilities system infrastructure replacement. 6/1/2009

City of Cadillac

Cadillac, City of

Combined Water/Sewer and Street Construction

Lynn St. from Cobb St. to Hersey St.; Hersey St. from Lynn St. to Oak St.; street construction costs $203,000; water/sewer construction costs $36,000

02262009

D VE $

e u

City of Cadillac

O R

Funding Request

Route (Infrastructure Only)

Park Avenue from Bridge Street to 876,698 Lake Street

A T

City of Charlevoix

Expected Completion Date

Submitted Requests - Not Approved

6/1/2009

983 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Chestnut/Leeson/W. Division Street Reconstruction

These are three highly-traveled and key arterial streets near the main campus of Cadillac High School and Cadillac Junior High as well as McKinley Elementary Schoo These streets see a significant amount of residential and commercial traffic in addition to the school traffic. Street costs are estimated at $230,000, with an additional $60,000 needed for Utilities system infrastructure replacements. 6/1/2009

9/1/2009

Combined Water/Sewer and Street Construction

Pine St. from Park St. to Lincoln St.; Lincoln St. from Pine St. to Holbrook St.; May St. from Lincoln St. to Washington St.; street construcution costs $287,000; water/sewer construction costs $50,000 6/1/2009

9/1/2009

Salt Storage Facility

The current storage facility for road salt is in need of replacement. Due to the City’s contractual obligation to maintain State trunkline routes, the State will cover 30% of the costs of the building.

North East Street Area Reconstruction

Existing: Bituminous and gravel streets with poor drainage, asbestos concrete water mains in need of replacement and sewer and water service needed in various areas. Proposed: Reconstruct 4280 linear feet of street/drainage improvements/sanitary sewer/water mains. 7/1/2009

Funding Request

D VE

Route (Infrastructure Only)

$

290,000 Federal aid streets

$

Pine-Lincoln-May 337,000 Streets

7/1/2009

$

100,000

11/1/2009

$

1,306,000 Local

Court Street Area Reconstruction

Existing: Gravel/deteriorated bituminous--extreme wash out areas even with medium intensity rain. Existing sanitary sewer and water main in poor conditions and some areas in need of sanitary sewer and water service. Proposed: Reconstruct 5,820 linear feet of street /drainage improvements/sanitary sewer/water mains. 7/1/2009

11/1/2009

$

Federal/Minor 1,752,000 Collector

Charlevoix-Emmet ISD Boyne Falls

Charlevoix-Emmet ISD Orion School

Roof replacement on school

5/1/2009

8/1/2009

$

585,000

Charlevoix-Emmet ISD Boyne Falls

Charlevoix-Emmet ISD Orion School

Boiler Replacement

4/1/2009

5/1/2009

$

250,000

Beaver Island Road Commission New Maintenance Garage

The proposed project will replace a woefully inadequate existing facility. The current garage was constructed in the 1920’s.The new facility will meet today’s building and energy code requirements. It will employ energy efficient technology and green design features, to reduce energy costs and environmental impacts. It will provide adequate heated equipment storage space, office and living space for road maintenance personnel. Summer 2009

Spring 2010

$

870,000

City of Cadillac

City of Cadillac

City of Cadillac

City of Boyne City

City of Boyne City

Cadillac, City of

Cadillac, City of

Cadillac, City of

Boyne City, City of

Boyne City, City of

Charlevoix County Road Commission

Peaine Towship

Charlevoix County Road Commission

South Arm Township; Charlevoix County Road Commission

Charlevoix County Road Commission

Evangelin Twp., Bay Twp., Hayes Twp., Charelvoix Twp.; Charlevoix County Road Commission

d e t

Ellsworth Road Rehabilitation

itt

Boyne City-Charlevoix Road Rehabilitation

m b u

T O

s t s

5/1/2009

P P A

-N

e u

q e R

O R

Road rehabilitation including 3.79-Miles of HMA base crushing and shaping, HMA paving, grading, minor vertical alignment corrections, curve superelevation corrections, drainage and roadside safety improvements. Also includes improvements to 5 side road intersections and storm sewer through Horton Bay. Road rehabilitation including 13.65-Miles of HMA base crushing and shaping, HMA paving, grading, minor vertical alignment corrections, curve superelevation corrections, drainage and roadside safety improvements. Also includes improvements to 43 side road intersections and storm sewer through Horton Bay.

6/1/2009

6/1/2009

11/1/2009

9/1/2010

$

East Jordan City Limits to Antrim 1,879,400 County Line

$

Boyne City Limits to Western Ave. 6,826,800 (13.65-Miles)

S 02262009

Submitted Requests - Not Approved

984 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Our building, erected in 1952 has its original single-pane windows, many not opening or closing correctly and wasting a great amount of heat because they are inefficient. We propose replacing them with energy efficient windows. Upgrading the airexchange system would provide fresh air for our students and staff. Insulation in the roof area would help tighten our building and make it more energy efficient. Adding wall insulation and siding to the front of the building and an airtight vestibule to our main entryway would eliminate a great amount of heat loss. Our building has asbestos in its floor tile and in insulation around water pipes, and although it is being managed safely, it is a drain on our budget. Our boiler which provides heat throughout the building is outdated and inefficient. Replacing it with several smaller, more energyefficient units is proposed. Pipes carrying hot water are corroded and leak, needing replacement. Paving the gravel parking area would also save on cleaning time and products throughout the building. We would propose erecting a wind spire on our property as well as photovoltaic cells on the roof to reduce our dependence on fossil fu6/1/2009

CASMAN Academy

Manistee, City of

CASMAN Academy

Berrien County

Lincoln Charter, Royalton and St Joseph Charter Hollywood Consolidated Drain #524 Townships Restoration

Benzie County

Benzie County

Fewins Reynolds Roads

Benzie County

Benzie County

Homestead Road

Benzie County

Benzie County

CR-677

Benzie County

Benzie County

River Road

Benzie County

Benzie County

North Manistee County Line Road

Holland Historical Trust City of Holland

Holland Museum, grounds

Holland Historical Trust City of Holland

Holland Museum, parking

Holland Historical Trust City of Holland

e t tt

i m

Holland Museum, building

City of Holland

Home Smart Appliances

City of Holland

ub

Holland Historical Trust City of Holland

S

Holland Historical Trust City of Holland

02262009

Holland Museum, HVAC

6 million dollar drain restoration to reduce major flooding and soil erosion in portions o the drainage district and to improve the water quality in the drain, as well as the downstream receiving waters, Hickory Creek and the St. Joseph River. 5/1/2009 From CR-669 to Reynolds to US-31. Widening, resurfacing, guardrail and pavement markings needed 7/1/2009 From Case Road to Pioneer Road. Widening, resurfacing, guardrail and pavement markings 7/1/2009 From US-31 to M-115. Widening, resurfacing, guardrail and pavement markings needed. 7/1/2009

T O

O R

P P A

-N

Funding Request

Route (Infrastructure Only)

D VE

9/1/2010

$

401,900

$

6,000,000

10/1/2009

$

650,000 federal aid

10/1/2009

$

1,200,000 federal aid

10/1/2009

$

3,500,000 federal aid

6/1/2009

7/1/2009

$

575,000 federal aid

6/1/2009

7/1/2009

$

650,000 federal aid

Funds requested for landscaping around the Holland Museum to control water runoff and erosion, resulting in less water usage for maintenance and preventing further building deterioration. 5/1/2009 Funds requested to re-pave and seal the Holland Museum’s parking area to control runoff and prevent further deterioration. 5/1/2009

7/1/2009

$

1,000

9/1/2009

$

4,000

9/1/2009

$

5,000

10/1/2009

$

7,500

End of 2009

$

10,000

10/1/2009

$

10,500

10/1/2009

$

31,000

s t s

Between M-22 and US-31. Resurfacing, guardrail and pavement markings needed. Between US-31 and Kurick Road. Resurfacing, guardrail and pavement markings needed.

e u

eq

R d

Holland Museum, windows and doors

Holland Historical Trust City of Holland

Start Date

Expected Completion Date

Funds requested to re-glaze and repaint windows and doors of Holland Museum with contemporary and green products to increase the Holland Museum’s energy efficiency. 5/1/2009

Funds requested to pressure wash the limestone exterior of the Holland Museum to re seal as needed, using eco-friendly materials if possible, for increased energy efficiency. 5/1/2009 Provide rebates for low-income households to replace existing appliances with those that are energy efficient. Spring 2009 Funds requested for replace individual non-working and outdated HVAC units in the Holland Museum with more energy efficient models. 5/1/2009

Utilizing eco-friendly material whenever possible, funds are requested to pressure wash, re-glaze and re-paint both the Historic Cappon House & Settlers House Museums, in an effort to prevent further deterioration of their exteriors and make both Cappon & Sattlers House Museum, buildings houses more energy efficient. 5/1/2009

Submitted Requests - Not Approved

985 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Riverwalk Theatre (Community Circle Players, Inc.)

City of Lansing

Project Name

Grant for Theatre Renovation and Technical Equipment

Hillsdale County

County of Hillsdale, City of Hillsdale, Township of Cambria Emergency Management Tower

City of Holland

City of Holland

Tree Planting

City of Holland

City of Holland

Wayfinding Signage

City of Portage

Comprehensive Technical Energy Analysis

City of Holland

City of Holland

Clinton Township Hillsdale County City of Center Line

Clinton Township County of Hillsdale City of Center Line

Matt Urban Storage Building Clinton Township Benchmark ReEstablishment Energy Retrofit Open Cut Repairs

City of Norway

City of Norway and Norway Township

Well Site Improvements

City of Center Line

10 Mile Road Water Main Connection to Warren

tt i m

d e t

b u S

Start Date

A non-profit community theatre, Community Circle Players (dba Riverwalk Theatre) provides quality entertainment to mid-Michigan theatre goers. The theatre is completing its 2nd major expansion that will provide a smaller theatre for use by Riverwalk, but also available to other arts groups for a variety of events. This grant would fund acoustical treatments and equip this new theatre space in downtown Lansing. Funding of $35,000 ($32,00 grant request) will provide a venue that will be a community resource with excellent acoustics, and modern light and sound systems. Currently the theatre does 10 productions/year and ticket sales over 14,000. The building is in use over 300 days per year and attracts performers, technical crews and patrons to downtown Lansing on a daily nightly basis. This grant will also help maintain the one fulltime theatre manager position and 1/2 time maintenance position at the theatre by providing additional revinue to meet operating expenses. This project could be funded throughTITLE VIII - National Endowment for the Arts or TITLE XII - Community Development Block Grants. 3/1/2009

PP

t s e

35,000 NA

10/1/2009

$

50,000

Fall 2009

$

50,000

Summer 2009

$

50,000

8/1/2009

Winter 2010

$

55,000

Summer 2009

Fall 2009

$

60,000

2/9/2009 6/1/2009 tbd

7/1/2009 11/1/2009 1 Year Plus

$ $ $

70,000 75,000 75,000 City Wide

$

75,000

1 Year

$

10 Mile Road, Lorraine to E. City 90,000 Limits

O N

qu

e R

A SCADA system will be installed at the well site, 2 above ground storage tanks, and 90 Days from one pump station. notice to proceed

Provide emergency connection to the City of Warren system for a backup supply. Topographic Survey & preliminary engineering complete.

tbd

Ingham County

Lansing/Mason

Implementation of a county-wide wireless system in Ingham County.

City of Holland

City of Holland

Museum Roof Repair

Windmill Island Deck Replacement

The focal point of this Island is an authentic windmill that was shipped from the Netherlands in the early 1960's. The deck of this windmill needs to be replaced in order to maintain this piece as a tourist attraction.

City of Holland

02262009

D VE $

A T

This project to be included as part of the Local Government Efficiency Block Grant program. A comprehensive study to be conducted to review electric and gas and develop strategies to reduce useage. The study will provide specific recommendations, identify implementation costs and project payback. The City of Portage has been proactive in implementing facility enhancements that result in energy use savings and this study will serve as the next step in achieving energy effiiciency results. The Matt Urban Sports & Recreation Complex is in need of a storage building to protect maintenance and recreation equipment. Re-establishment of land survey benchmarks throughout the Township to current FEMA elevations/datum with GPS for GIS insertion. Total energy retrofit

Submitted Requests - Not Approved

Funding Request

Route (Infrastructure Only)

5/31/2009

In the case of a disaster in Ingham County, the County's Emergency Operations Center needs wireless access for communications. Ingham County also has a need to do a site survey and implement wireless in the County's 4 main buildings. This will allow for communications to laptops and mobile devices without having a wired connection. The County's courtrooms need this technology for attorneys when they bring their laptops to court. The County has a need for wireless video surveillance at its 4 main sites where it is not cost efficient to run wires. 9/1/2009 The City-owned Museum building is need of major roof repairs that if not done soon could result in damage to the historic collection. Spring 2009

City of Holland

O R

Replace existing 150 foot radio tower that is in danger of collapse. Loss of this structure would disable all Emergency Management activities by taking the radio system out of service. Funds to completely address this very necessary project are not available in our economically challenged area. 4/1/2009 The City is recognized as a Tree City USA and this project would plant additional trees throughout the City. Spring 2009 This project will expand the direction "Wayfinding" signage throughout the community. This is a benefit to the tourism aspect of the local economy. Spring 2009

s

City of Portage

City of Center Line

Project Description

Expected Completion Date

Spring 2009

9/1/2011

$

100,000

Summer 2009

$

100,000

Summer 2009

$

110,000

986 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Center Line

City of Center Line

Many manhole with minor structurally damage were identified during the S-2 grant project but were not eligible for SRF loan under DEQ guidelines. Repairs will Manhole Channel & Drop Connection Repairs trenchless if possible to assure reliability.

Ingham County

Lansing/Mason

Install emergency phones in Ingham County Buildings and Parks.

Purchase and install a total of 15 emergency phones at 8 Ingham County locations, including seven county parks and the Ingham County Fairgrounds.

Engleman Water Main Replacement

Replace deteriorated 6" water main with 8" to serve residential street, interconnect to Memorial Field and park area main that also supplies industrial development on Sherwood Ave. Preliminary engineering underway. tbd

Gate Valve & Well Repairs

Repair & replacement of deteriorated and non-operational gate valve to enhance water quality and ability to isolate smallest possible main lengths during emergency repairs. Preliminary engineering underway. City will use its GIS maps for construction plans. No topo required. tbd Many sections of structurally damaged collector sewers we identified during the S-2 grant project but were not eligible for SRF loan under DEQ guidelines. Repairs will trenchless if possible to assure reliability, reduce possible collapses, and enhance compliance with ACO requirements to minimize SSOs. GIS maps will be used for plans. No topo required. Specs ready. Aeration Cell Maintenance

City of Center Line

City of Center Line

City of Center Line

City of Center Line

Expected Completion Date

tbd

1 Year

8/1/2009

8/1/2010

A T

$

D VE

115,000 City Wide

$

126,000

$

Englemen Street, Lawrence to 150,000 Memorial Field

1 Year

$

150,000 City Wide

1 Year Fall 09

$ $

200,000 City Wide 200,000

O R

PP

Funding Request

Route (Infrastructure Only)

1 Year

City of Center Line Village of Homer

City of Center Line Homer

Structural Repairs to Deteriorated San. Sewers Wastewater Treatment Plant

City of Holland City of Holland

City of Holland City of Holland

Central Neighborhood Pedestrian Lights Lead Paint Abatement

Pedestrian lights have been installed in certain areas of the City adding to the ambiance of pedestrian movements. This project will add to the walkability of the City.Summer 2009 Assist low-income households to test and remove lead-paint hazards Spring 2009

Fall 2009 Indefinite

$ $

200,000 200,000

City of Holland

Montello Park Storm water Rain gardens

Montello Park is a City neighborhood that experiences storm drainage problems. This project will provide environmentally friendly rain gardens for controlling storm drainage. Spring 2009

Summer 2009

$

200,000

City of Portage Village of Homer

Homer

This project involving multiple jurisdictions would submitted as part of the Byrne Justice Assistance Grants. The project would enhance training opportunities for the major regional law enforcement agencies in areas such as use of force, firearms, emergency vehicle operations and investigations. Funding in this area would enable Regional Law Enforcement Training Program lasting and on-going savings opportunities. Water Meter Program Upgrade & Replace Existing Water Meters 6/9/2009

Fall 09

$ $

200,000 205,000

City of Center Line

City of Center Line

Weigand Water Main Replacement

Replace ext. 6" WM with 8". Topographic Survey & preliminary engineering complete.tbd

1 Year

$

Weigand Street, 215,000 Lawrence to Mazen

City of Center Line

City of Center Line

Weingartz Water Main Replacement

Replace ext. 6" WM with 8". Topographic Survey & preliminary engineering complete.tbd

1 Year

$

Weingartz Street, 215,000 Lawrence to Mazen

Columbia Avenue Streetscape Clay St. Sanitary Sewer Line

This section of Columbia Avenue has experienced growth in small businesses, including those related to the movie industry. In fact, this area is now referred to as the Columbia Avenue Arts District. This project will provide streetscape improvements to compliment the investments being made by the adjacent property owners. New Sanitary Sewer Industrial Zone

Fall 2009 Fall 09

$ $

225,000 15th to 24th Streets 230,000

Asset Management for Public Utilities

Developing/Improving the Township GIS to be able to prepare an asset management plan and Capital Improvement Projects for the publicly owned Water and Sewer (San and Storm) Systems. 2/9/2009

8/1/2010

$

250,000

City of Holland

City of Holland Village of Homer

Clinton Township

t s e

tbd 6/9/2009

u q e

R d

City of Holland Homer

Clinton Township

e t tt

i m

b u S

02262009

s

O N

Submitted Requests - Not Approved

Summer 2009 6/9/2009

987 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City of Portage

City of Portage

Oakland Drive

City of Holland

City of Holland

Convert Traffic Lights to LED

Project Description

Start Date

Reconstruction of major streets that have maximized life cycle. West Milham serves as primary detour route for I-94 and will be particularly important for maintaining regional traffic flow during the upcoming widening of I-94. Specifically, West Milham contains the nearest I-94 interchange to the South Westnedge interchange, which will be under construction and out of service for periods of time as discussed in Project 1. This interchange will handle a significant portion of the 40,000 to 60,000 vehicles that utilize South Westnedge Avenue. Construction requires some sub-base rehabilitation and new pavement. Additionally, necessary repairs to curb and gutter/paved shoulders and storm drainage will also be identified within project limits. 7/1/2009 Replacement of the current traffic lights with LED lights will result in substantial energy usage savings. Spring 2009

Airport Hangar Site Development

City of Holland

City of Holland

Replace Windmill Island Watermain

City of Holland

City of Holland

Bouws Pool Renovation

City of Portage County of Hillsdale

The Portage Public Schools recently received voter approval for an $120 million bond program for upgraded facilities throughout the school system. In conjunction with the bond program there are several associated transportation and infrastructure related improvements. One component ready to be constructed is a signalized intersection at Intersection Signalization for Portage Central East Centre Avenue and Currier Drive. The new signal will enhance vehicular and pedestrian safety for access to the new Portage Central High School complex. 8/1/2009 High School Energy & building update Total energy update, heating, insulation, roof on (2) buildings 7/1/2009

New Center Council, Inc.

Ingham County

Ingham County

(Historic New Center District) Detroit, MI

Lansing

02262009

st

e u

q e R

N s

D VE $

Fall 2009

$

250,000 Throughout City

Fall 2009

$

250,000

Fall 2009

$

250,000

Summer 2009

$

250,000

$ $

East Centre Avenue and Currier 275,000 Drive 300,000

Fall 2009

Fall 2009 12/1/2009

With the recent adoption of the City of Detroit’s non-motorized transportation plan, the ongoing success of the Dequindre Cut Greenway, and the further development of the Corktown-Mexicantown Greenlink, the Council will construct bike lanes in New Center to connect to Greenway project already underway. This project will encourage bike transportation within our community, and connections to other Greenways projects throughout the city. 9/1/2009

6/1/2010

$

Cass, Second, Trumbull, Grand Boulevard, Dequindre Cut, 300,000 Detroit Riverwalk

Mid-Michigan has a Regional Health Information Organization (The Capital Area RHIO or CARHIO) which will roll out the capacity for full-featured health information exchange (HIE) in 2009, including: results delivery, physician order entry, electronic Implantation of an electronic medical records referrals and electronic access to patient records. It is important to ensure that public health in Ingham County is equipped with an electronic medical records (EMR) system system for the Ingham County Health that is connected to CARHIO so that low-income and uninsured clients are not left out 5/1/2009 Department.

5/1/2011

$

300,000

Ingham County has a need to integrate and upgrade the current video conferencing units and purchase new video conferencing units for Ingham County Courtrooms and the Youth Center. This will allow for the County to do video conferencing sessions and video arraignment so the Ingham County Sheriff's Office does not have to transport inmates and at-risk youth. This is a matter of public safety and will significantly reduce the costs associated with the transport. 9/1/2009

9/1/2011

$

300,000

New Center Bike Lane Greenway Connector Project

d e tt

t i m

b u S

Lansing/Mason

T O

Funding Request

Route (Infrastructure Only)

Oakland Drive from the I-94 interchange to 250,000 Kilgore Road

O R

P P A

Tulip City Airport is a state Tier 1 airport at which 98% of the traffic is business related. The Authority is unable to construct additional aircraft hangars without site improvements. Spring 2009 This project is essential to continued use of this park/tourist attraction. The current watermain is undersized and aging. Summer 2009 The Bouws Pool is an outdoor facility that is heavily used by children, but is in need of renovation in order for it to operate effectively. Spring 2009

West Michigan Airport Authority City of Holland

City of Portage Hillsdale County

Expected Completion Date

Implementation of video conferencing capabilities for Ingham County Offices and Courtrooms.

Submitted Requests - Not Approved

988 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

City of Center Line

City of Center Line

Pavement Patching of Act 51 Major Street

Patching and repairs to defective pavement and curbs concentration on industrial and commercial areas first, then safe school access, then remaining streets to the extent that funding permits tbd

City of Norway

City of Norway and Norway Township

Well Site Improvements

New well at existing well site as recommended by MDEQ.

90 Days from notice to proceed

City of Center Line

City of Center Line

Helen Water Main Replacement

Replace approximately 1150 LF of ext. 10" WM with 8". Plans and specs complete.

tbd

Repair and/or replace existing pavement, drainage improvements of existing municipal facility parking lots on public property none of which are part of Part 51 or FHWA approved routes. Windmill Island is a City owned park that is experiencing erosion to river banks and the waterway is in need of dredging.

Spring 2009

Summer 2009

$

350,000

5/1/2010

$

390,000

Windmill Island erosion & canal

Lansing

The Ingham County Health Department's (ICHD) main campus in south Lansing houses many different clinical operations. These include: a Public Health Nursing Office, a Women’s Health Clinic, a Child Health Clinic, an Adult Health Clinic, an Oral Health Clinic, and an Infectious Disease Clinic. Because of the economic downturn, demand for health services from low-income and uninsured people is increasing. Yet, Renovation of the main campus of the Ingham the ICHD is at its operational limits and cannot accommodate more patients. The County Health Department to expand and ICHD proposes a major renovation of its main campus which will expand the scale of streamline its clinical facilities. its clinical facilities and streamline its services so that more people can receive care. 5/1/2009

New Center Council, Inc.

(Historic New Center District) Detroit, MI

New Center Viaduct Improvements

City of South Haven

City of South Haven

Indian Grove Lift Station Replacement

Clinton Township

Clinton Township

Township Civic Center Splash Park

Clinton Township

Clinton Township

City of Holland

City of Holland

tt i m

d e t

S

Will improve failing, pedestrian underpass at railway viaducts. The viaducts are blighted and in a state of disrepair City will construct a new sanitary sewer lift station. Station will have increased pumping ability, an onsite generator, and more reliable controls.

6/1/2009

8/1/2009

$

8/1/2009

12/1/2009

$

400,000

Construction of an outdoor public water facility consisting of spray columns, spray loops, water wheels, and other interactive water equipment.

2/9/2009

8/10/2010

$

400,000

8/10/2010

$

400,000

Fall 2009

$

400,000

$ $

West Grand Boulevard and 405,000 Cass Ave 405,000

9/5/2010

$

West Grand Boulevard and 410,000 Second Ave

1 Year

$

450,000 Coolidge Street

e R

Bouws Pool Water Park

New Center Skate Park Municipal Equipment

Public skate park for skateboarders, rollerblades, and BMX bicyclists operated by New Center Council to promote health and outdoor recreation in Detroit. There is no such facility in Detroit. 6/1/2009 Village Equipment (Vac. Truck, Leaf Vac., Plow Truck) 6/9/2009

ub

New Center Council, Inc. Village of Homer

(Historic New Center District) Detroit, MI Homer

New Center Council, Inc.

(Historic New Center District) Detroit, MI

New Center Council Parking Lot

City of Center Line

Non-federal aid (local street) road with rehabilitate existing 2 lane concrete road with Coolidge Pavement Rehabilitation, Lawrence limited parking via substantial pavement patching. 2 blocks long, West of Van Dyke (M-53) tbd to Van Dyke

City of Center Line

02262009

1 Year

Michigan Rail Road, Woodward, John R, Cass, 400,000 Second, Third

Construction of an outdoor public skate park for local residents. Activities include skateboarding, biking and rollerblading. Park to consist of ramps, pipes, and other obstacles. 3/9/2009 This project would provide this popular outdoor pool with a water feature to serve the children and families of this area. Summer 2009

Township Civic Center Skate Park

Helen Street, 325,000 Evelyn to Sylvan

$

City of Holland

qu

$

1 Year

City of Holland

t s e

300,000

tbd

A T

Municipal Facility Parking Lot Repairs & Replacements

Ingham County

$

D VE

Library, Parks & Rec, City Hall / Courts / Police / 350,000 Fire

City of Center Line

s

O R

$

Sherwood, Lawrence, Engleman, Liberal, Bernice, Warren, Stephens, Federal, 300,000 Warren, et al

PP

City of Center Line

O N

1 Year

Funding Request

Route (Infrastructure Only)

Parking facility need for commercial district

Submitted Requests - Not Approved

6/1/2009

12/1/2009 Fall 09

989 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of South Haven

City of South Haven

City of Holland

City of Holland

Clinton Township

Clinton Township

Clinton Township

City of Ecorse

Clinton Township

City of Ecorse

Project Name

Project Description

Start Date

Expected Completion Date

73rd Street Reconstruction

City will reconstruct a local street. Project will include new storm sewer.

6/1/2009

12/1/2009

HOME Investment Partnership Township Civic Center Parking Lot Reconstruction with stormwater BMPs.

Provide assistance to a non-profit organization in the rehabilitation of a former high school building. The building will be used as low-income senior housing. The assistance will be to integrate green technologies into the rehabilitation. Removal and replacement of existing asphalt parking lot incorporating Stormwater BMP.

Fall 2009

2010

2/9/2009

8/9/2009

Township Civic Center Bike Hike Pathway

Construction of a interconnecting bike hike pathway between existing paths located on the Civic Center Property, the Library, the future Arboretum, athletic fields and Budd and Canal Parks. 2/9/2009

15th Street Road Reconstruction

Removal and Replacement of existing road pavement, drive approaches, and sidewalks. Upgrading of storm sewer and drainage along with upgrading of the existing water main.

Funding Request

$

D VE

Route (Infrastructure Only)

73rd Street from Phoenix to 470,000 Sherman Drive

$

500,000

$

500,000

8/9/2009

$

500,000

12/9/2009

$

500,000 15th Street

9 months

$

500,000 City Wide

Spring 2009

Fall 2009

$

Spring 2009

Summer 2009

$

500,000 Throughout City BL196 to 16th 500,000 Street

Summer 2009

End of 2009

$

550,000

6/1/2009

9/1/2009

$

568,677

5/1/2009 1 Year Plus

$ $

East Grand Boulevard between 600,000 I-75 and Woodward 600,000 City Wide

End of 2009

$

600,000

Summer 2009

$

Lincoln to River 600,000 Avenues

P P A

O R

7/9/2009

City of Center Line

City of Center Line

Full Length & Sectional CIPP Lining

Repair 26 known locations of structurally damaged (cracked) pipe by trenchless CIPP techniques. This will assure continuity of service and seal the storm sewer end of prior CSO interconnects which can leak if the bulkheads in the san. End of the connections deteriorate. This minimizes SSO potential and enhances long term ACO compliance. Preliminary Engineering complete. Will use GIS maps for plans. tbd

City of Holland

City of Holland

Sidewalk Network Improvements

In order for the City to enhance its status as a walkable community, additional sidewalks are needed to provide safe access for citizens, including school students.

City of Holland

City of Holland

Waverly Road

This is a major roadway in the City that is in need of resurfacing.

City of Holland

Fire Station #1 Improvements

City of Norway

City of Holland City of Norway and Norway Township

New Center Council, Inc. City of Center Line

(Historic New Center District) Detroit, MI City of Center Line

East Grand Boulevard Streetscape Renovation Clean and CCTV Storm Sewers

City of Holland

City of Holland

Home Weatherization

City of Holland

City of Holland

City of Ecorse

City of Ecorse

$

625,000 Ecorse City Hall

City of Dearborn

7th Street is a major route through downtown Holland and needs resurfacing badly. Spring 2009 Remove and replace existing storm sewer system and parking lots at Ecorse City Hall. 7/9/2009 Alternative fuel fleet cars (25) for the City of Dearborn in cooperation with Ford Motor Company research and development 5/1/2009

11/9/2009

City of Dearborn

7th Street Improvement Ecorse City Hall Parking Lot and Drainage Improvements Alternative Fuel Fleet Cars for City of Dearborn

July, 2009

$

625,000

Harding Pavement Replacement

Non-federal aid (local street) road with completed plans to remove and replace existing 2 lane road with limited parking, reduce pavement width and increase greenbelt. 2 blocks long, East of Van Dyke (M-53)

1 Year

$

650,000 Harding Street

Summit Road Water Line Replacement

d e tt

t i m

S

ub

T O

N s

e u

st

This fire station is in need of upgrades as it has deteriorated since its mid-1970's construction. This station is critical to providing full fire service to the City. Replace old 1 inch water line that acts as a main water line for 12 residents on Summit Road.

q e R

Repair infrastructure right of way along East Grand Boulevard, renovate boulevard though replacement of irrigation, removal of dead trees, installation of new trees and flower beds 4/1/2009 tbd Repair/replace old windows, storm windows, doors, weather-stripping, insulation, and siding. Spring 2009

City of Center Line

City of Center Line

City of Holland

City of Holland

Municipal Stadium Locker Room Facility

The municipal stadium does not have locker rooms and the construction of such a facility will enhance the stadium's use for Hope College and area high school teams. Summer 2009

11/1/2009

$

750,000

City of Ecorse

City of Ecorse

Street Sectioning

Removal and Replacement of existing street sections, joint repairs, and joint sealing. 8/9/2009

12/9/2009

$

Various Streets 750,000 Within The City

02262009

Submitted Requests - Not Approved

tbd

990 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tri-County Health Dept.

Clinton Township

Clinton Township

City of Center Line

Project Name

Project Description

Expected Completion Date

Start Date

Public Health Dental Clinic

Construction of a 3,800 sq.ft. building to house a 6 chair Public Health Dental Clinic. The clinic would be adjacent to the existing County Human & Public Health service in Hillsdale, MI. The dental clinic is designed to provide dental access & care to adults & children without insurance that are 200% of the poverty limit. 2009 June

2009 November

$

760,000

Clinton Township

Sanitary Sewer Manhole Rehabilitation

Rehabilitation of existing sanitary sewer manholes utilizing a fused calcium aluminate cementitious liner with an external manhole sealing system. (MHs constructed in 1950s) 2/9/2009

8/1/2009

$

800,000

Clinton Township

Replacement of existing 6" and 8" water main line and appurtenances with new 8" Asbury Park/Liverpool Subdivision Water Main water main. The water main is being reconstructed due to age and evidence of Replacement fractures and breaks within the system. (Main constructed in 1950s)

12/1/2009

$

800,000

City of Center Line, Macomb County

Rehabilitation of subbase, pavement and curbs on existing 5 Lane 10 Mile from City 10 Mile Rehabilitation, Lawrence to West City Hall to west city limits jointly with Road Commission of Macomb County. The project Limits is part of FY 2009 TIP tbd

1 Year

$

800,000 10 Mile Road

$

800,000

$

840,000

$

South Haven Pl from Cherry St to 875,000 LaGrange St

Hillsdale

2/9/2009

P P A

O R

City of Norway

City of Norway and Norway Township

Wastewater Treatment Plant Improvements

The Wastweater Treatment facility upgrade involves a new headworks (currently none at the plant), improvements to the existing clarifiers, redesign of the aeration system with new blowers (energy and organic efficiencies), and remove potable water from the system and use greywater. A new SCADA system will also be installed (currently 180 days from no system). notice to proceed

Village of Homer

Homer

Hamilton St. Watermain Transmission Line

Critical Village Watermain Transmission Line

s t s

T O

-N

City of South Haven

City of South Haven

South Haven Place Reconstruction

City will reconstruct a local street. Project will include new water main, sewer main, and storm sewer.

City of Norway Hillsdale County

City of Norway and Norway Township County of Hillsdale

2nd Aveneue Project Annex Retrofit

Replace water, sewer and storm on 2nd Avenue from Section Street to US8. Total energy retrofit, heating

Hillsdale County

County of Hillsdale, Village of Osseo, Jefferson Township

9-1-1 Equipment Upgrade

City of Dearborn

City of Dearborn

Green Housing Rehabilitation

City of Holland

City of Holland

Energy Upgrades to City Facilities

City of Portage

Funding Request

Route (Infrastructure Only)

tt i m

e u

d e t

S

6/1/2009

12/1/2009

180 days from notice to proceed 10/1/2009 5/1/2010

Replace existing radio equipment with narrow-band capable radios to comply with FCC mandate ($600,000). Replace outdated 9-1-1 telephones and Computer Aided Dispatch Equipment ($400,000). Funds to completely address this very necessary project are not available in our economically challenged area. 6/1/2009 Rehabilitation of housing stock using green products, energy star and USGBC approaches to improved efficiency 6/1/2009 An energy audit is now being conducted that will identify energy saving opportunities through changes to City buildings. Spring 2009

$ $

955,945 1,000,000

9/1/2010

$

1,000,000

December, 2010

$

1,000,000

End of 2009

$

1,000,000

Major Street Reconstruction - East Centre Avenue

Fall 2009

$

East Centre Avenue from South Westnedge Avenue 1,000,000 to Portage Road

Municipal Stadium Synthetic Turf

The City has entered into an agreement with Hope College to replace the existing municipal stadium turf with synthetic turf to reduce maintenance costs and increase recreational opportunities for citizens.

Summer 2009

Fall 2009

$

1,000,000

Summer 2009

11/1/2009

$

S. Washington to 1,100,000 City Limits

On Going

$

1,140,000 N/A

City of Holland

City of Holland

City of Holland

City of Holland

Matt Urban Drive

Improvements to this road are long overdue in that residences and business have been using what is, in part, a rural street design in an urban area.

New Center Council, Inc.

(Historic New Center District) Detroit, MI

Woodward Gateway Façade Improvement Project

Ongoing program administered by New Center Council to renovate existing building facades on Woodward Avenue and Grand Boulevard in New Center. Building owner participation with adherence to design standards. 5/1/2005

02262009

Fall 09

Reconstruction of major streets that have maximized life cycle. East Centre Avenue is a major thoroughfare that serves the South Westnedge Retail Corridor and Pfizer's largest manufacturing facility in the world. Construction requires some sub-base rehabilitation and new pavement. Additionally, necessary repairs to curb and gutter/paved shoulders and storm drainage will also be identified within project limits. 7/1/2009

ub

City of Portage

q e R

6/9/2009

D VE

Submitted Requests - Not Approved

991 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clinton Township

Project Name

Harper Beach Subdivision Water Main Replacement

Clinton Township

Project Description

Expected Completion Date

Start Date

Replacement of existing 8" water main line and appurtenances with new 8" water main. The water main is being reconstructed due to age and evidence of fractures and breaks within the system. (Main constructed in 1950s)

2/9/2009

Replacement of existing 12" water main line and appurtenances with new 12" water main. The water main is being reconstructed due to age and evidence of fractures and breaks within the system. (Main constructed in 1950s) 2/9/2009 The primary aircraft apron at Tulip City Airport is in deteriorating condition and should be resurfaced or replaced with concrete for a longer life. Spring 2009 Purchase and rehabilitate foreclosed, vacant properties to provide affordable housing and eliminate blighting conditions. Spring 2009

9/1/2009

$

1,200,000

$

1,200,000

$

1,200,000

$

1,200,000

$

1,250,000

$

1,250,000 8th to 24th Streets

$

1,388,942

D VE

Clinton Township Clinton Township West Michigan Airport Authority City of Holland

Moravian/Garfield Subdivision Water Main

City of Holland

City of Holland

Neighborhood Stabilization

City of Norway

City of Norway and Norway Township

Broadband (fiber) upgrade

City of Holland

City of Holland

Maple Avenue Improvement

Upgrade the City's existing 450 mghz cable/internet system to 1 ghz. The system will also include installation of a fiber trunk ring and individual fiber connections to public Immediately upon 6 months from facilities including the school and industrial/commercial area. award of funding start of project Reconstruction of a collector street that is in disrepair and is experiencing drainage problems. Spring 2009 Fall 2009

City of Norway

City of Norway and Norway Township

Saginaw Street Project

Replace water, sewer and storm on Saginaw Street from US2 to 2nd Avenue

Monroe Boulevard Reconstruction

City will reconstruct a local street. Project will include new water main, sewer main, and storm sewer.

12/1/2009

$

Monroe Blvd from South city Limit to 1,400,000 Aylworth Ave

Expansion of the Ingham County Drain Commissioner's facility.

Renovate and expand the existing building. This would include adding a “green roof” to the proposed addition. Mechanical systems would be upgraded as well as lighting to improve energy efficiencies. 8/1/2009

7/1/2010

$

1,400,000

Construct a new training building at the Ingham County Sheriff’s Office.

Construct a new 12,000 square foot training facility. The facility would be designed and built to include all types of correctional training and emergency response situations.

9/1/2010

$

1,400,000

$

Kilgore Road from South Westnedge Avenue to Lovers 1,400,000 Lane

City of South Haven

Ingham County

Ingham County

Airport Apron Rehabilitation

City of South Haven

Mason

Mason

tt i m

City of Portage

City of Portage

Kilgore Road

City of Norway

City of Norway and Norway Township

Norway Street Project

City of Norway

City of Norway and Norway Township

Clinton Township

Ingham County

S

ub

Clinton Township

Mason

02262009

d e t

7th Avenue/8the Avenue Project

T O

s t s

q e R

O R

P P A

-N

e u

12/1/2009

Funding Request

Route (Infrastructure Only)

Fall 2009 Indefinite

180 days from notice to proceed

6/1/2009

8/1/2009

Improve safety and traffic flow on East Kilgore Road from South Westnedge Avenue to Lovers Lane. West Milham serves as primary detour route for I-94 (1st major street north of I-94 running parallel) and will be particularly important for maintaining regional traffic flow during the upcoming widening of I-94 as discussed in Project 1. Project will include widening the existing roadway and adding an optional center turn lane. The project will also include replacement of the bridge that crosses Portage Creek just west of Lovers Lane. 7/1/2009

Spring 2010

Replace water, sewer and storm on Norway Street from US2 to 2nd Avenue

180 days from notice to proceed

$

1,441,512

Replace water, sewer and storm on 7th and 8th Avenues in the Third Ward Neighborhood

180 days from notice to proceed

$

1,499,650

Construction of a interconnecting bike hike pathway between three existing Township Bike Hike Pathway between Canal, Budd and Parks- Budd, Canal and George George, adjacent neighborhoods and local George George Parks businesses. 2/9/2009

12/1/2009

$

1,500,000

Replace existing heating system with a new HVAC system that will improve operating Ingham County Jail – Replace HVAC system efficiency and will improve indoor air quality. Architectural modifications will be at Posts 3, 6, 9. required to accommodate the mechanical and electrical work that will be required. 8/1/2009

9/1/2010

$

1,500,000

Submitted Requests - Not Approved

992 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Holland

City of Holland

New Center Council, Inc. Village of Homer

(Historic New Center District) Detroit, MI Homer

City of Ecorse

City of Ecorse

City of Holland

City of Ecorse

City of Ecorse

City of Holland

Project Name

Project Description

Expected Completion Date

Start Date

Fiber Optic Build-Out

The City has its own utility that provides a fiber network in the community. The buildout of this system will serve as an economic development tool that will help improve the competitiveness of businesses and encourage further growth. Summer 2009

New Center Park Hillsdale St. - Extension

New Center Park will be constructed into a an outdoor movie and concert venue, complete with full concessions / bistro facility. This will allow New Center Council to produce outdoor community events to serve this below poverty census tract. North Village Watermain/Sewer Extension

6/1/2009 6/9/2009

10th Street Road Reconstruction

Removal and Replacement of existing road pavement, drive approaches, and sidewalks. Upgrading of storm sewer and drainage along with upgrading of the existing water main.

9/9/2009

Salliotte Street Road Reconstruction

Removal and Replacement of existing road pavement, drive approaches, and sidewalks. Upgrading of storm sewer and drainage along with upgrading of the existing water main.

9/9/2009

Parking Deck Roof

The City is near completing a two-level parking deck in the downtown. The structure has been designed to accommodate a roof structure that would use solar energy to light the upper level of the deck and keep the snow off of it. Summer 2009

T O

Spring 2010

N s

$

1,500,000

$ $

West Grand Boulevard and 1,562,000 Second Ave 1,600,000

7/10/2009

$

1,650,000 10th Street

7/10/2009

$

1,650,000 Salliotte Street

Fall 2009

$

1,700,000

Spring 2010

$

1,700,000

9/5/2010 Fall 09

O R

P P A

Funding Request

D VE

City of Holland

City of Holland

Window-On-The-Waterfront Boardwalk

Window-On-The-Waterfront is a park that is bordered by the downtown, Windmill Island, and the Macatawa River. A boardwalk is planned that will connect all three of these areas. This project will provide the community with a walkway that traverses from the downtown into a marsh area and will end at the beautiful Windmill Island. Summer 2009

City of Norway

City of Norway and Norway Township

Iron Street Project

Replace water, sewer and storm on Iron Street from US2 to 2nd Avenue

180 days from notice to proceed

$

1,787,160

City of Norway

City of Norway and Norway Township

Mine Street Project

Replace water, sewer and storm on Mine Street from US2 to 2nd Avenue

180 days from notice to proceed

$

1,787,160

Clinton Township

Gratiot City Subdivision Water Main Replacement

Replacement of existing 6" and 8" water main line and appurtenances with new 8" water main. The water main is being reconstructed due to age and evidence of fractures and breaks within the system. (Main constructed in 1950s)

2/9/2009

12/1/2009

$

1,800,000

Fall 2009

$

1,800,000

Clinton Township

West Michigan Airport Authority City of Holland

City of South Haven

Ingham County

e u

d e t

Replace Instrument Landing System

City of South Haven

itt

q e R

The existing Instrument Landing System was constructed in the mid-1990s and is now in need of regular repair. This system directly impacts the safe use of Tulip City Airport. Spring 2009 City will reconstruct a local street. Project will include new water main, sewer main, and storm sewer.

6/1/2009

12/1/2009

$

Kalamazoo St from Aylworth Ave to 1,900,000 Clinton St.

Construction of a new facility to replace file storage for medical and court records at the current Ingham County annex facility.

Demolish the existing Ingham County annex facility and construct a new file storage facility. The new facility would be about 16,000 square feet and would house both medical and court files for Ingham County.

9/1/2009

9/1/2010

$

1,900,000

6/1/2009

9/5/2010

$

1,990,000 N/A

Kalamazoo Street Reconstruction

m b u

Mason

st

Route (Infrastructure Only)

New Center Council, Inc.

(Historic New Center District) Detroit, MI

Boulevard West Building

Renovation of 45,000 square foot office structure for use primarily by several nonprofit organizations, with ground floor retail to increase access of quality goods and services.

New Center Council, Inc.

(Historic New Center District) Detroit, MI

New Center Woodward Streetscape Project Phase II

Repair infrastructure right of way along Woodward Avenue and install streetscape imrovements, including historic streetlights, signage, trash receptacles and bike racks.

4/1/2009

8/1/2009

$

Woodward between I-94 and 2,000,000 Euclid Avenue

Upgrades to the Ingham County Human Services Building mechanical system.

This project would include but is not limited to replacing existing chiller and piping that is over 23 years old, a boiler that is over 22 years old, and re-commissioning the entire building to maximize energy efficiency. 9/1/2009

7/1/2010

$

2,000,000

Ingham County

S

Lansing

02262009

Submitted Requests - Not Approved

993 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City of Dearborn

City of Dearborn

LED Downtown Lighting

City of Holland

City of Holland

Convert Street Lights to LED

Project Description Start Date Re-Lamp Downtown Lighting using LED light source for two downtown districts in Dearborn 6/1/2009 Replacement of the current street lights with LED lights will result in substantial energy usage savings. Spring 2009

City of Holland

City of Holland

Downtown Ice Skating Facility

Downtown Holland is the social center of this community and is one of the most vibrant downtowns in Michigan. The plans for an outdoor downtown ice skating facility will provide another reason to come downtown which is important for the local economy as well. Summer 2009

City of Norway

City of Norway and Norway Township

Industrial Park Public Works Project

Storm water, water, and sewer improvements in the City's industrial park.

Error Free Healthcare Energy Retrofit

Medical errors cause almost 100,000 deaths per year and an extra 17 billion dollars in wasted medical expenses annually! Three Major factors that contribute to the medical errors problem occur when a patient: 1) is unable to transfer needed medical information; 2) does not transfer enough medical information; and 3) transfers incorrect medical information. Persons admitted to emergency rooms often times are traumatized and not clear minded. Under these circumstances, no information, insufficient information or even inaccurate information may be transferred from the patient to the caregiver. During routine visits to healthcare providers, sometimes the medical information transferred is incomplete and even incorrect. This is a demonstration project. Four thousand participants will carry their complete medical records with them at all times on a computer ready flash chip. The purpose of the Human health History Chip is to eliminate these three major error sources. Even if these sources are not eliminated, but just reduced, healthcare quality goes up and healthcare cost goes down. ASAP Total energy retrofit 6/1/2009

Southfield Road Water Main Replacement

Replacement of existing 6-inch water main along Southfield Road with two new 12inch ductile iron water mains. Also, make final connections to the existing 12-inch water main along Mill Street.

T O

Human Health History Assoc, Inc. City of Saginaw Hillsdale County County of Hillsdale

City of Ecorse

City of Ecorse

$

2,000,000

$

2,140,000

9/1/2010 6/1/2010

$ $

2,269,000 2,300,000

12/9/2009

$

2,500,000 Southfield Road

O R

D VE

P P A

t s e

u q e

7/9/2009

2,500,000

Improvement to a collector street that is in great disrepair.

Spring 2009

Fall 2009

$

Washington to 2,500,000 Lincoln Avenues

Bethel Educational Center

This project is the construction of a Day Care Center on the East side of Saginaw. The project is designed to care for 150 infants and preschoolers. The current Day Care Center houses 72 children and infants. The project will support mostly single parents who need a safe, caring place to leave their children while they

4/1/2009

10/1/2009

$

2,600,000

Sanitary Sewer System Lead Rehabilitation

Lining of existing sewer leads to eliminate infiltration/inflow into sanitary sewer system within the Township Administrative Consent Order (AFO-SW02-001). 2/9/2009

8/1/2009

$

3,000,000

Renovation of existing maintenance facility and grounds using stormwater BMPs and LEED principles. Building is in poor condition and poses potential safety problems. Renovation of DPW Maintenance Facility with The facility is used to house maintenance staff, equipment and utility materials. (Last renovation: 1972) 2/9/2009 stormwater BMPs and LEED principles.

8/1/2010

$

3,000,000

40th Street Improvement

02262009

Fall 2009

$

City of Holland

Clinton Township

2,000,000 Throughout City

End of 2009

City of Holland

Clinton Township

$

2,500,000

Skate Park and Ice Skating Facility

R d

e t t

t i m

ub

S

End of 2009

$

City of Holland

Clinton Township

2,000,000

April, 2011

City of Holland

Clinton Township

$

Mechanical HVAC Upgrades, lighting upgrades, building envelope improvements, temperature control upgrades, water conservation measures, renewable geothermal energy system, Intention of project is to allow LifeWays to save $1.5M over a 10-15 year period, to use a geothermal energy system and to enable us to replace old and ineffecient HVAC systems that are costly to repair and failing. April, 2009 The City needs to replace its well-used skateboard park and the plan is to combine this facility with an outdoor refrigerated ice skating facility. Summer 2009

Energy Efficiency Building Upgrade

City of Saginaw

Funding Request

Route (Infrastructure Only)

December, 2010

180 days from notice to proceed

N s

LifeWays Community Mental Health Agency, 1200 N. West Ave., Jackson, MI 49202 Jackson, MI

Bethel Educational Center

Expected Completion Date

Submitted Requests - Not Approved

994 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clinton Township

Friends of Theodore Roethke Foundation City of Dearborn

City of Holland

New Center Council, Inc.

Project Description

Start Date

Renovation of existing maintenance facility and grounds using stormwater Best Management Practices (BMPs) and Leadership in Energy and Environmental Design Renovation of Water and Sewer Maintenance (LEED). Building is in poor condition and poses potential safety problems. The facility is used to house maintenance staff, equipment and utility materials. (Last renovation Facility with Stormwater BMPs and LEED 1972) 2/9/2009 principles.

Clinton Township

The Theodore and Carl Roethke homes are adjacent residences in Saginaw, Michigan, formerly belonging to the family of the Michigan Pulitzer Prize-winner, Theodore Roethke. The Friends of Theodore Roethke have undertaken "to promote the Theodore Roethke heritage by raising funds to purchase and restore" them. Theodore's will be used as an interactive museum, while Carl's will be developed as a cultural/educational center. In 2008, the poet's centennial year, programs supported by NEA and MHC were sponsored by Friends of Theodore Roethke resulting in $55,000 input to area economies and a prestigious Saginaw "All Area Arts Award" for adding to the quality of community life. Saginaw Mayor Joyce Seals said the Roethke home "gives hope to Saginaw." Architectural Study has been donated by Leslie Tincknell, FAIA, to address energy efficient renovation goals. Green building Museum, Greenhouse,and Development techniques to be used throughout, including: classrooms for arts education, literacy Center Serve Community in the name of poet, improvement, adult reading instruction, career counseling, environmental awareness, Saginaw, Michigan 48602 Theodore Roethke etc; multimedia facilities for education and publishing; bedrooms for visiting artist-teac 5/1/2009 Installation of on-site power generation for East Downtown Dearborn projects as an City of Dearborn On-Site Power Generation energy alternative and efficiency measure 6/1/2009

T O

City of Holland

(Historic New Center District) Detroit, MI

West Michigan Airport Authority City of Holland

Clinton Township New Center Council, Inc.

Project Name

New Amsterdam / TechTown Streetscape Linkages Project

Repair and renovate infrastructure, including historic streetlights, signage, trash receptacles and bike racks. Infrastructure work will connect already completed infrastructure projects.

Sanitary Sewer Lining

itt

d e t

Latin Quarter Bldg Renovation

m b u

Lansing

Construct new consolidated E-911 Center. (2) green houses Hillsdale County Medical Care Skilled Nursing Homes

Hillsdale County

Hillsdale

Ingham County

City of Lansing, Meridian Township, and Delhi Construction of non-motorized pathways for Township the Ingham County Parks.

D VE $

3,000,000

5/1/2011

$

3,000,000

Decmber 2010

$

3,000,000

End of 2009

$

3,000,000

O R

Summer 2009

5/1/2010

$

Milwaukee, Baltimore, Cass, Second, Third, 3,200,000 Amsterdam, York

Tulip City Airport is primarily a business airport and the existing terminal is an outdated 1950 ranch house that in now way reflects the economic health of this community. The terminal needs to be replaced in order to meet the air travel needs of this community. Summer 2009

Fall 2009

$

3,500,000

Lining of 8” to 15" sanitary sewer pipe including removal of mineral deposits and protruding lateral connections. Sewer point repairs are also included as well as associated appurtenances. (Main constructed in 1950s)

2/9/2009

8/1/2009

$

4,000,000

Historic renovation of vacant theater into multitenant retail bizarre.

9/1/2009

4/5/2010

$

4,000,000 N/A

Construct a new Ingham County Consolidated E-911 Central Dispatch Center, merging the operations of the Cities of East Lansing and Lansing Dispatch Centers, in order to create a state of the art Consolidated Dispatch Center with new facilities and technology, at a lower cost than operating the current separate 911 Centers. 8/1/2009

11/1/2010

$

4,000,000

Two (10 bed) Skilled Nursing Homes

May/June 2009

2010 January

$

4,000,000

Construction of Phase II of the Lake Lansing Trail as well as connection of Maguire Park to Valhalla Park non-motorized pathways as the next step toward the eventual goal of connecting all Ingham County Parks by non-motorized pathways.

9/1/2009

9/1/2011

$

4,300,000

e u

q e R

Ingham County

S

-N

Improvements/relocation of Fire Station #2

s t s

8/10/2010

Funding Request

Route (Infrastructure Only)

P P A

This fire station is also in need of improvements and it may be beneficial to relocate this station. The station serves primarily the central city area as well as the entire City.

Replace Terminal

Clinton Township (Historic New Center District) Detroit, MI

02262009

Expected Completion Date

Submitted Requests - Not Approved

8/1/2009

995 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Ingham County

Mason

City of Bay City Electric Light & Power Bay City

City of Portage

Ingham County

City of Portage

Mason

Mason

City of Dearborn

City of Dearborn

City of South Haven

City of South Haven

City of Center Line

City of Holland County of Hillsdale

Start Date

Construct new Animal Control facility.

Construct a new single story Animal Control facility that is about 16,000 square feet. The new shelter would include but is limited to the following areas: administration, public, animal kennel, and animal treatment areas. This would replace the existing facility that was built in 1971 and is about 9,390 square feet.

Meter Data Management and Customer Information Software

Bay City Electric is committed to installing Automatic Metering Infrastructure (AMI) technology. The installation of these meters is a $3.7 million capital investment by Bay City Electric that is scheduled to begin later this year. Bay City Electric desires to maximize and manage the data that will be generated by these new devices with Meter Data Management and Customer Information Software. That is, Bay City Electric desires to integrate Smart Meter Technology into Utility Customer Service Functions with Meter Data Management and Customer Information Software. This software, when fully integrated into Customer Service Functions, will: 1) be capable o measuring and recording usage data in time differentiated registers, including hourly or such interval as is specified, 2) allow electric consumers, suppliers and service providers to participate in all types of price-based demand response programs, and 3) provide other data and functionality that address power quality and other electricity service issues. 6/1/2009

Milham Road

Improve safety and traffic flow on West Milham Avenue from Angling Road to 12th Street. West Milham serves as primary detour route for I-94 (1st major street south of I-94 running parallel) and will be particularly important for maintaining regional traffic flow during the upcoming widening of I-94 as discussed in Project 1. Project will include widening the existing roadway and adding an optional center turn lane. Additional components include curbs and gutters, bike lanes, sidewalk, storm drainage and sanitary sewer enhancements. 7/1/2009

Remodel and expand existing 55th District Court building.

Renovate and expand the existing 55th District Court building. The building is not designed to meet current courthouse design standards. Courtrooms are inadequate in size, there is no sound barrier between lobby and courtroom, lighting is poor, there are limited security and surveillance systems, and judicial suites are not up to state guidelines. 8/1/2009

$

4,660,000

Spring 2010

$

Milham Avenue from Angling Road 4,800,000 to 12th St.

10/1/2010

$

5,000,000

9/1/2010

$

5,500,000

September, 2010

$

6,000,000

4/1/2010

$

6,200,000

Macatawa River Master Plan Projects Courthouse Addition

A master plan has been prepared for the Lower Macatawa River area and there are numerous projects in the plan that will provide community access to this watershed. Pathways, bicycle access, and natural preservation are key components of this plan. Summer 2009 New construction to consolidate services 3/1/2010

End of 2009 11/1/2011

$ $

6,300,000 8,000,000

SRF Project No. 5345-01

Project to be funded in 2nd quarter of current state FY to correct chronic system maintenance issue and to implement ACO requirements to reduce or eliminate SSOs. Bid opening Feb.3, 2009. Grants and negative interest requested to the maximum extent possible. tbd

1 Year Plus

$

9,100,000 City Wide

10/31/2011

$

eq

N s

Construct a new Minimum-Security Jail of approximately 180 beds near the existing Ingham County Jail facility. This new construction will house low-risk non-violent offenders, separating them from medium and high-risk offenders. This more Construct a new Minimum Security Jail at the appropriate housing design should improve security at the Jail, as well as the safety of inmates and staff. 8/1/2009 Ingham County Sheriff’s Office. Refurbishment of Commuter Rail Cars to support Commuter Rail System for the Ann Regional Commuter Rail Cars Arbor - Detroit Line running through Dearborn 5/1/2009 Water intake project. City will construct a new 15 million gallon per day water intake, Water Plant Intake to feed the new water filtration plan. 8/1/2009

e t tt

i m

Economic Development Corp. of Electrical service transmission & distribution to Permanent electrical service – transmission & distribution to Alternative Energy Chippewa County Kinross Charter Township Alternative Energy Renaissance Zone Renaissance Zone

02262009

Submitted Requests - Not Approved

O R

P P A

st

e u

11/1/2010

D VE

4,500,000

T O

9/1/2009

Funding Request

Route (Infrastructure Only)

$

ub

S

City of Center Line

Project Description

R d

Ingham County

City of Holland Hillsdale County

Project Name

Expected Completion Date

2009

12/31/2009

15,000,000

996 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency New Center Council, Inc.

(Historic New Center District) Detroit, MI

City of Bay City Electric Light & Power Bay City

Project Name

Project Description

Start Date

New Amsterdam Parking / Retail Deck

Multi-tenant commercial parking for institutions and public, with ground floor retail. This parking deck will allow for the maximum development and utilization of vacant land in the New Center CBD.

Relocate Saginaw Street Substation

This project involves the construction of a new electrical power substation ($1,027,000 project cost) to replace the old existing electrical substation that feeds most of the down town area of Bay City, Michigan. This substation will also feed the new YMCA ($15.5 million) and the 43 acre waterfront brownfield adjacent to downtown known as the Uptown site. The reasons for the replacement of this substation is the age of the equipment, existing safety hazards present in the substation, improvement power efficiency gain (5%-7%) from the new substation, and improved reliability of electrical power in this growing area. 5/1/2009

The municipal Civic Center serves recreational needs in the community, but is in poor condition. The plans are to transition this facility into a multi-use facility with a focus on providing recreational opportunities. End of 2009

City of Holland

Civic Center Improvements

New Center Council, Inc.

(Historic New Center District) Detroit, MI

Historic GREEN/LEAD renovation for reuse as multitenant facility for non-profit use, American Beauty Iron Works Bldg Renovation focusing on sustainability and transportation. This renovation will have retail.

T O

9/1/2009

11/15/2009

$

16,527,000

End of 2010

$

18,000,000

8/1/2010

$

19,000,000

4/1/2011

$

19,000,000

December, 2010

$

21,400,000

December, 2010

$

24,700,000

11/1/2010

$

30,500,000

City of South Haven

City of South Haven

Water Filtration Plant Construction

Water filtration plant project. City will construct a new 7 million gallon per day water plant. Project is mandated by the State of Michigan, due to water shortages.

Dearborn Intermodal Rail Passenger Station

LEED certified Intermodal Rail Station implementation to develop full service intercity, regional commuter rail, midwest high speed rail, bus, shuttle and taxi station for the City of Dearborn to be in place for the October 1010 initiation of commuter rail service from Ann Arbor to Detroit. 4/1/2009

Dearborn Conference Center

LEED Certified regional conference center of approximately 200,000 gross square feet including banquet hall, meeting rooms, pre-function space and exhibit hall to accommodate multiple day events for groups in the 1,500-1,700 person range.

4/1/2009

t s e

u q e

D VE 18,750,000 N/A

Sanitary Relief Sewer System Upgrade

City of Dearborn

Cass Avenue and 15,500,000 Amsterdam Ave

$

Clinton Township

N s

$

9/1/2010

Clinton Township

City of Dearborn

O R

Funding Request

Route (Infrastructure Only)

9/1/2009

Installation of relief sewers within the Township Administrative Consent Order (AFOSW02-001) to eliminate sanitary sewer overflow and bring Township into compliance with EPA standards. 2/9/2009

City of Dearborn

9/1/2010

P P A

City of Holland

City of Dearborn

Expected Completion Date

4/1/2009

R d

i m

e t tt

Otsego County

b u S

Bagley, Otsego Lake and Hayes Townships Sewer and water system

02262009

This request is for a sewer and water system which will protect critcal non city areas of Otsego County with the most sensitive acquifers. Areas initially serviced include the border areas around 19,000 Acre Otsego Lake, the largest body of fresh surface water in the county, extending Southwest to Hayes Township to provide services for residents in the known contamination and near term contamination threat areas of the Hayes 22 Processing Facility BTEX Plume. The groundwater is contaminated now and the plume is moving based on very recent studies. This facility will also provide water and sewer to the former Georgia Pacific hardboard manufacturing plant in Gaylord, which now uses in ground disposal systems. This plant is now vacant and the addition of the sewer and water infastructure will materially assist the community in reclaiming this facility for productive jobs by adding flexibility in the types of users and processes that can be used there. 7/1/2009

Submitted Requests - Not Approved

997 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

West Michigan Horticultural Society, Inc. dba Frederik Meijer Gardens & Sculpture Park

Grand Rapids Township

Project Name

Maintaining the Masterpiece, Phase 2

Project Description

Start Date

Frederik Meijer Gardens & Sculpture Park requests $19.7 million in funding to renovate, expand and sustain permanent education and sculpture galleries, classrooms and storage/support areas within our existing facility. The 45,000 sq. ft. shovel-ready project is able to award contracts immediately and is prepared to break ground within 120 days after the start of the American Recovery and Reinvestment Plan (ARRP). Meijer Gardens expects that project completion will be no more than two years from the launch date, tentatively set for May 2009. The expansion will be a "green" initiative for which Meijer Gardens plans to pursue LEED Gold certification. The three-level structure will renovate the Sculpture Education Center, redesign the outdoor Terrace, and transform the Library into an interactive visitor center. Other renovated areas are lunchroom, expanded hallways, elevator, and storage/mechanical rooms. This project has a direct economic impact on the area by hiring regional architectural and construction firms. In addition to welcoming about 530,000 guests--more than 100,000 beyond West Michigan--annually, Meijer Gardens5/1/2009

A T

Village of Marcelus

Marcellus,Mi

DPW Bulding

Marcellus,Mi

Dibble Street Drainage Issue

Village of Marcelus

Marcellus,Mi

DPW Bulding storage

Marcellus,Mi

Village of Marcelus

Marcellus,Mi

Village of Marcelus

Marcellus,Mi

d e tt

it

Property located on east M-216 next to the Dollar General

m b u DPW Bulding

O R

PP

Fence and pavement at water tower

st

s

Funding Request

4/30/2011

O N

$

$

We are working on the We are currently working with Wightman & Associates to fix the sever drainage engineering plans problem that we are having on Dibble Street. We have an incomplete storm and with Wightman sewer system here and in other areas of the Village that are causing severe flooding. and Assocaites We are looking to preserve teh publics health and safety. as we speak We are needing t replace the current dirt floor in our DPW storage with heated concrete floor in order to preserve the village equipment. Summer 09 Summer 09

$

We are working on the engineering plans with Wightman We are currently looking to build a park and ride lot for the transportation of large sem and Assocaites and for the use of local residents that are carpooling to work. as we speak

$

e u

q e R

We are needing to remove the old insulation which at this time is leaking and causing mold with new insulation that is closed cell so that there is not leak Summer 09 According to home land security and the USDA we need to cement and fence in our water tower and pump house. Summer 09

Route (Infrastructure Only)

D VE

Spring of this year, we are waiting till the weather is warm enough to get started. We have everything ready We are currently replacing the isulation in our DPW building due to flaws in the origina to go as we construction of the building speak. Summer 09

Village of Marcelus

Village of Marcelus

Expected Completion Date

$

Summer 09

$

Summer 09

$

27,600,000

300 block of 28,000 Monroe

400,000 Main st to Dibble St 300 Block of East 15,000 Monroe

40,000 M-216 East 300 Block of East 28,000 Monroe 300 Block of East 32,000 Monroe

S 02262009

Submitted Requests - Not Approved

998 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Interlochen Center for the Arts Interlochen City of Holland City of Holland

Historic Student and Faculty Housing Renovations (1935-1965) Home Energy Improvements

A Child is Missing program (Sen. Martha Scott)

A Child is Missing program

Project Description

Expected Completion Date

Start Date

We are in the process of green renovations to our summer faculty housing, and have about 25 residences left to update at a cost of $20,000 each ($500,000). Since we have already completed several green renovations of a like nature, details are available, as well as photos and other documentation. Essential green renovations include repairing original foundations, replacing roofs and windows, and updating the electrical and plumbing. A majority of the dormitories on campus are 40 years old or older. Major green renovations to student housing include: installing fire suppression systems in the remaining three dormitories without sprinklers ($225,000); improving heating, ventilation and air conditioning systems and installing new boilers that will allow for greater energy efficiency ($500,000); adding siding to cover the exterior of the three cement block dormitories that will also improve energy efficiency ($390,000) and renovations to the flooring in dormitory hallways and rooms in 40 student areas renovations would begin upon ($800,000). Complete or partial funding assistance would allow us to perform our most pressing capital improvements that are critical to the retention of faculty and studreceipt of funding Spring 2009

O R

Baraga & Houghton County Road Commissions

County Wide

Paver

Joint venture fo purchase asphalt paver at $225,000

Baraga & Houghton County Road Commissions

Coutny Wide

Pothole Machine

Baraga & Houghton County Road Commissions

Coutny Wide

Baraga & Houghton County Road Commissions

Coutny Wide

T O

P P A

-N

Funding Request

Route (Infrastructure Only)

D VE

All renovations listed could be completed within two years of the start date End of 2009

Immediate

Spring 2009

$

225,000 All Routes

Joint venture for capital outlay for Baraga & Houghton Road Commission Asphalt Pulveizer @ $200,000

Now

Spring 2009

$

200,000 All Routes

Shouldering Machine

Joint venture for capital outlay for Baraga & Houghon Coutny Road Commission Shoulderin Machine @ $200,000

Now

Spring 2009

$

200,000 All Routes

Euip sharing

Joint venture for capital outlay for Baraga & Houghton Road Commission Asphalt Pulveizer @ $400,000

Now

400,000 All Routes

s t s

e u

q e R

Spring 2009

$

Berville

Berlin Township Township Hall

Construct new energy efficient municipal building, parking lot, utilities, and grading. The existing building is old, inadequate in size and does not meet current federal, state, and local building codes. Architectural and engineering design concepts will be utilizing low impact development methods such as a green roof, geothermal heating and rain gardens. 6/10/2009

11/1/2009

$

Hough Road & 1,250,000 North Avenue

Berlin Township Village of Caro Village of Caro Village of Caro

Berville Village of Caro Village of Caro Village of Caro

Construct sanitary sewer and lagoon treatment system for the existing residential and commercial businesses. The current town has old, inadequate or failing septic fields. Currently the untreated sewage discharges into storm drains around the community which flows directly into small tributaries in the area. This project will benefit the entire Berville Sewer Collection & Treatment System region, especially the downstream rivers, streams, and lakes. 8/10/2009 West Sherman Mill-Overlay 6/1/2009 West Frank Mill-Overlay With New Water Lines 6/1/2009 Gilford Road Reconstruct Road with New Storm Drains Freemont to Hooper 8/1/2009

6/30/2010 7/1/2009 9/1/2009 12/1/2009

$ $ $ $

2,500,000 25,000 30,000 50,000

Village of Caro Village of Caro Village of Caro

Village of Caro Village of Caro Village of Caro

Hooper Street South Almer Gilford Road

5/1/2010 5/1/2010 12/1/2009

$ $ $

Berlin Township

02262009

d e tt

t i m

b u S

Reconstruct Road with New Storm Drains and New Water Lines Entire Road Reconstruct Road with New Water Lines New Sidewalks on 2005 Gilford Road Project Full Length

Submitted Requests - Not Approved

8/1/2009 8/1/2009 5/1/2009

Throughout Berville n/a n/a n/a

70,000 n/a 70,000 n/a 90,000 n/a

999 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Bridgman

City of Bridgman

Water Intake Improvements Project

The existing City of Bridgman water intake structure was constructed in 1951 and consists of three 150'+/- long, 12" diameter, intake screens originally constructed beneath the bottom of Lake Michigan. In 2001, the north and south intake screens failed and were replaced. The third screen which runs west beneath Lake Michigan is failing, reducing the volume of water available for treatment. The proposed project would replace the existing westerly intake screen beneath Lake Michigan and extend it to a total length of 300' to assure an adequate water supply for the City of Bridgman.6/15/2009

City of Clare

Clare/Grant

DPW Garage Energy Efficiency Improvements

1940s-vintage building requires energy efficiency improvements: lighting, insulation, windows, insulated garage doors, heating system, and façade improvements 5/20/2009

Wastewater Plant Nitrification/Dentrification Filter System

City's current 20-year old wastewater treatment plant requires technology upgrade to meet MDEQ-mandated amonia nitrogen allowable discharge levels. Engineer study completed to determine best solution to meet amonia levels; nitrification/dentrification filter system determined to be best solution. 6/20/2009

Clare/Grant

Clare/Grant

City of Clare

Clare/Grant

City of Clare

City of Clare

City of Clare

Clare/Grant

City of Clare

Clare/Grant

City of Mason

City of Mason

City of Mason

City of Mason

8/20/2009

$

125,000 N/A

11/20/2009

$

950,000 N/A

New 40-Acre Industrial Park

City's current 80-acre industrial park has no vacancies/is full. Two existing industrial businesses located in Clare have expressed interest to relocate and expand. Tentative deal to purchase 40 acres for new park has been negotiated. Funds needed to construct new park infrasturcure (roads and public utilities). New industrial park considered essential to continued economic growth and development of City. 6/15/2009

12/15/2009

$

600,000 N/A

Type I Water Supply & Iron Removal Treatment System

Current public water system is limited in capacity and incapable of providing support of future economic development. Water wells and second treatment system needed to provide development and growth potential. 6/22/2009

12/30/2009

$

1,300,000 N/A

Water Tower

City has only 20 (estimated) Residential Equivalents available for future development with current water infrastructure system. New 500,000 gal water essential for future economic development 6/30/2009

12/30/2009

$

1,400,000 N/A

City Hall Renovation

City Hall constructed in 1932; requires upgrades to improve energy efficiency (replace windows & doors, replace steam heat; install new HVAC); restore historical façade; make ADA accessible (bathrooms, entrances, elevator), and improve work areas/public service areas. 5/20/2009

12/31/2009

$

950,000 N/A

s t s

-N

e u

d e t

non-potable water supply

tt i m

T O

Security cameras for water treatment plant

q e R

8/15/2009

6/30/2009

$

Waste water treatment plant 60,000 POTW

Digital video recording system with remote downloads to provide security for primary water treatment plant for city. The recording would be downloaded off site for additional security. 5/1/2009

8/1/2009

$

50,000

4/1/2009

9/30/2009

$

325,000

5/15/2009

11/1/2009

$

7/1/2009

11/1/2009

$

4/15/2009

11/15/2009

$

Water Treatment 1,500,000 Plant Curtis Street lift 300,000 station FFD to South to 1,100,000 Kipp Road

$

M-36 Cedar Street to US127 to city 2,000,000 limits

Construct a non-potable water supply for chemical feed to conserve seven million gallons of treated potable water annually.

4/1/2009

Radio Tower

City of Mason

City of Mason

Water Softner System

Water Softening system added to water treatment plant reducing hard water and provided soften water to community reducing wear to private systems.

City of Mason

City of Mason

Eliminate Lift Station

City of Mason

City of Mason

Franklin Farms Drive

Remove lift station and construct sanitary line. Collector Street and bridge over Willow Creek linking arterial streets and neighborhood of approximately 300 homes

West Columbia Street

Arterial Street, Rebuild of street (3,800 feet),Curb/Gutter/Sidewalks water main (1,800 feet), sanitary line(1,800 feet) and storm drains. 5/15/2009

b u S

O R

P P A

City of Mason

02262009

D VE $

City of Mason

City of Mason

Funding Request

Route (Infrastructure Only)

Water Intake Beneath Lake Michigan at the west end of Lake 430,000 Street

Radio Tower services all emergency operations and field service operations of the regional area. Current tower is aged and would be replaced with a mono-pole. Emergency services also serve Ingham County as Mason is the County Seat.

City of Mason

Expected Completion Date

Submitted Requests - Not Approved

11/15/2009

1000 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Mason

City of Mason

City of Mason

City of Mason

City of Mason

City of Mason

City of Mason

City of Mason

Project Name

Project Description

Start Date

Expected Completion Date

Water Main loop

A 12" water main looping water distribution system along Temple street from Columbia to M-36 (Ash Streets). This provides appropriate water flow and distribution to eastern side of city and enhances fire protection. This water main runs a 12" water supply to Mason High School and Mason Urgent Care medical facility. 7/1/2009

Riverwalk Phase III

Phase III of the Riverwalk trail system loops the eastern side of the city from the primary trail system bi-secting the city. It links neighborhoods as well as connects three city parks, one county park and the highschool.

POTW ultra-violet radiation system

Effluent generated for POTW plant is treated with chlorine gas to disinfect. The Ultraviolet radiation system would eliminate the associated costs and hazards of a chlorination system. 8/1/2009

POTW Headworks system

Add new Headworks system to remove screenings and solids into plant that currently go into plant and cause damage. Allow safety for employees who currently are doing servicing manually. 8/1/2009

11/15/2009

O R

7/1/2009

P P A

11/30/2009

Funding Request

D VE $

$

Temple St. from Columbia to M-36 200,000 Ash St.

Route along eastside city streets and park 1,000,000 system

12/1/2009

$

600,000 POTW Plant

12/1/2009

$

750,000 POTW Plant

3/31/2010

$

600,000

4/1/2010 6/30/2010

$ $

6,000,000 6,000,000

City of Mason

City of Mason

Fire Rescue Truck

City of Mason City of Mason

City of Mason City of Mason

City Hall/Police Station Mason Branch Library

The Fire Rescue Apparatus primary use is intended to service state and county road accidents that require extracation and multi-agency support. Services include ice rescue, confined space rescue and fire fighting. City of Mason Fire Department also services the county seat of government, two townships and is primary responders to Jewett Airport. 7/1/2009 Construct City Hall/Police Station and Emergency Response Coordinator Operations Office 4/1/2009 Construct a 17,000 square foot Branch Library within City of Mason 7/1/2009

Redevelopment of 124 &140 E. Ash Street properties Water Main replacement WWTL Cleaning Storm Sewer Replace-ment

Significant buildings in Historic Downtown Mason directly across the street from the Historic Ingham County Court House. The two properties located at 124 & 140 E. Ash Street are obsolete and in disrepair. Property is abandoned to tax foreclosure. City considers properties as Brownfields and requires assistance in remediation to make the buildings safe and secure. 7/1/2009 4" water main replacement 6/1/2009 Wastewater Treatment Lagoons cleaning & rehab 6/1/2009 Replace storm sewer 8/1/2009

7/1/2010 9/1/2009 11/1/2009 11/1/2009

$

1,000,000

$

2,100,000

sidewalks within town need ADA accessibility to allow disabled Americans to access existing businesses. An entire block of businesses are currently not ADA accessible. immediate

9/1/2009

$

90,000

Expansion of the jail cellblock and new garage construction. Upgrade facility to include; electrical, windows, plumbing, air exchange system, & surveilance cameras. Implemation of new E911 center. 5/9/2009

5/10/2009

Replace roof & gym floor. Upgrade entrance & exterior finishes.

6/15/2009

8/14/2009

$

129,012

Add gym/band/shop wing; add divder curtain in existing gym; renovate a portion of existing first floor; upgrade 2ndary elect. distribution, security sys., power outlets, intercom/bell, clock sys's, add classroom phone sys., emer. lighting & wiring. Purchase buses. Upgrade roof, renovate a portion of existing first floor. Add LCD projectors, carts & peripherals; computers, printers & scanners for elementary computer lab. Improve track, add school zone signs and directional pavement markings, develop playfield for miscellaneous activities, new playground equipment.

6/15/2009

12/17/2010

$

6,568,160

3/4/2011

$

240,393

8/1/2010

$

2,000,000

8/1/2010

$

2,500,000

City of Mason City of Perry City of Perry City of Perry

City of Petersburg Gogebic County Sheriff's Office

City of Mason Perry Perry Perry

City of Petersburg

City of Bessemer

ADA sidewalks, curb road paving

d e tt

Gogebic County Jail

it

Ironwood Area Schools Ironwood, Michigan 49938 Sleight Elementary School

u S

bm

Ironwood Area Schools Ironwood, Michigan 49938 L.L. Wright High School Ironwood Area Schools Ironwood, Michigan 49938 Norrie Elementary School Lexington Township

Lexington Township

Lexington South Sewer District

Lexington Township

Lexington Township

Lexington North Water District

02262009

T O

s t s

-N

e u

q e R

Abate asbestos prior to demolition. Demolish building. 1/3/2011 Construction of public sewer system for homes located 1 mile south of the Village of Lexington to meet DEQ requirements. 7/1/2009 Connection of 4.5 miles of Lakeshore property to exisiting transmission line between the Villages of Lexington and Port Sanilac. 7/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

1001 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan

Farmington Hills

Farmington Hills

Project Name

Project Description

Start Date

Expected Completion Date

Reconstruction of Center Drive and BGR.

The Center Driveway is the access road over the Ravine Drain on Boys and Girls Republic's campus. The waterway, Noble Brook, is a tributary of the Rouge River. The road has been eroding at the crossing, causing half the road to be shut down and creating a dangerous situation for motorists and maintenance personnel. The road is in generally poor condition and requires reconstruction for approximately 300 feet either side of the crossing. The drain has begun to erode into the road embankment north of the crossing. Measures have been taken to slow the erosion, but a permanent fix is needed. Preliminary discussions have been held with MDEQ, plans and specifications have been developed for reconstruction of the access drive, realignment of the drain to prevent further erosion of the road embankments and coordination of permitting of the project by MDEQ and other regulatory agencies. The project will benefit the environment by eliminating the erosion and preserving the tributary of the Rouge; it will benefit the agency by sustaining infrastructure of the 80 acre campus.

Residential Generators

This project includes the installation of 8 circuit transfer switches in the electrical rooms of each of three residential units (housing up to 80 youth); backup of one circuit from upstairs panel in each unit; installation of generator receptacle on the exterior of each building and the purchase of three portable generators and extension cords.

BGR Campus Cabling

P P A

O R

Funding Request

D VE $

240,600

$

4,704

The back of the developed campus house 5 buildings, 3 of which are not cabled for computer networking. Ultimately, cabling will allow those with offices in these buildings to be networked to the agency's statewide system and to have inernet access, both of which are essential to doing business, especially as part of a statewide agency. Use of e-mail also reduces energy consumption by reducing the use of paper in memos, reports, etc., and reducing the use of fuel, since webinars with multiple participants may be carried on via inernet rather than having to travel to a central location. The project includes Plenum type cable, cable testing, termination, wall plates, wall jacks, and patch panel as well as the labor involved.

$

13,169

Installation of lighting upgrades to reduce energy consumptionthroughout the building. Furnishing and installing 111 lithonia 2GT8 332 A12 MVOLT 1/3 GEB101S 3 tube 2' x 4' fluorescent suspended ceiling lighting fixture with (3) GE F32T8SP35ECO lamps; 14 2GT8 3 U31 A12 MVOLT 1/3 GEB101S with (3)GE F31T8SPX35U lampsl and one WC2 25 MVOLT GEB101S with 2 GE F25T8SP35ECO lamps.

$

26,125

Solar Water Heating/BGR

Installation of solar water heating systems for three residential buildings which house up to 80 residents on BGR's campus. Each system includes: 8 solar panels 4 x 8 selective surface, mounted flush on south facing residence hall roofs; one 200 gallon solar storage tank; one AC solar boiler package -- heat exchanger, pump, controls; all installation labor, pipe, valves, fittings, insulation for complete job. The complete, installed system is sized to save $6,300 per year at 2009 gas rates with savings increase as utility rates rise; and it reduces energy consumption.

$

39,024

Kreft Lighting

Upgrading the lighting in the Kreft Building includes removing all existing T-12, 4-lamp 2 x 4 lay-in fluorescent fixtures and disposing of them; providing and installing new energy-efficient T-8, 3 lamp 2 x 4 lay-in fluorescent fixtues.

$

55,186

T O

Route (Infrastructure Only)

N s

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan Lutheran Child & Family Service of Michigan

Farmington Hills

Bay City

Bay City Light Upgrades

itt

Farmington Hills

Oak Park

02262009

S

m b u

t s e

qu

d e t

e R

Submitted Requests - Not Approved

1002 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan

Lutheran Child & Family Service of Michigan

Farmington Hills

Project Name

Project Description

Start Date

McElroy Generator

The McElroy Center Building is an activities center which houses a gym, restrooms, locker rooms, a kitchen and a library. In the event of a power outage, especially one of some length, the building could house the youth and their staff, increasing the safety of the youth in care. The building is already prepped for the installation of a generator. The project includes installing a Guardian #QT 10068, natural gas, 3 phase, 120/208v with a steel enclosure on the rear of the building next to the existing service. The generator will provide approximately 260A of 208V-three phase power for building operation. It will feed the heat, the lighting and general purpose loads, wit the exception of the air conditioning. Additionally, an 800 amp, 120/208v 3 phase Nema 3R automatic transfer switch will be installed; a concrete pad will be provided and installed behind the building for the generator to sit on; the existing air conditionin units will be inerlocked so that they will not function in the event of a utility shut down; natural gas piping from the gas meter to the generator will be installed.

Kreft Generator

Includes installing a Baldor #IDLC200-3JDB 200K W Diesel fueled generator, three phase 120/208v and a Thompson Technologies 800 amp service rated three phase transfer switch; installing a concrete pad behind the building near DTE's transformer for the generator to sit on; provision of a diesel fuel allowance of 365 gallons @ $3.65 per gallon; and materials and labor to rework the underground raceway from the DTE's transformer to the building main distribution panel into the automatic service rated 800 amp transfer switch.

Oak Park

Heat System Upgrade

$

80,070

Project includes disconnecting and removing 2 existing boilers and installing 4 Lochinvar Knight boilers which are 95% efficient; installing Smart System Operating Controls which are Energy Star Qualified; piping in primary and secondary piping; connecting the boilers to the existing gas piping; reconnecting to existing electrical system, venting the boilers in PVC through existing roof openings; piping condensate to the floor drain in the boiler room; disposing of the old boilers; testing, starting and adjusting equipment for optimum performance and providing parts and labor warranties.

$

131,423

Photovoltaic Panels BGR

Installation of Photovoltaic Panels on the Maintenance Building in the back section of the developed campus at Boys and Girls Republic.. This is a 3-step project which will reduce emissions and reduce costs. The steps include re-roofing the maintenance building; installing of a 3.6k W grid tied photovoltaic system on the south facing roof located above the Maintenance Building; installing Naturalite Daylighting tubes in the gymnasium building, computer lab building and the kitchen/dininghall building to reduce energy consumption in those buildings, making the Photovoltaic system more effective. This photovoltaic system will off-set a portion of the energy consumption in the computer lab, kitchen/dining hall building, school building, gymnasium building, and the maintenance building. Energy generated and not used will sold back to the power grid.

$

135,242

Vehicle Upgrade

Replacement of 11 agency vehicles statewide; they range in age from 15 to 8 years old with an average mileage of 110,000 miles per vehicle. They are not fuel efficient. Replacement includes the purchase of 11 vehicles from Ford, Chrysler or GM: 4 biofuel ready 12 passenger vans; 3 hybrid 5 passenger SUVs; 2 fuel efficient 7 passenger mini-vans; 1 fuel efficient pick-up truck; and 1 fuel efficient 5 passenger automobile.

$

315,565

s

State-wide

02262009

t i m

b u S

t s e

O N

qu

e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 62,364

d e tt

Farmington Hills

PP

O R

Funding Request

$

A T

Oak Park

Expected Completion Date

1003 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lutheran Child & Family Service of Michigan Mason Consolidated Schools

Mason Consolidated Schools

Oak Park

Erie

Erie

Project Name

Project Description

Start Date

Expected Completion Date

Kreft Windows

Removal and replacement of 7,000 sq. ft. of existing glass as well as aluminum framing in the Metro-Detroit Regional Headquarters, the Kreft Building. This include Kawneer 2250 curtain wall framing with black anodized finish; 1" O.A. grey insulated glass with low E coating and matching 1" insulated spandrel glass; perimeter caulking at interior and exterior as required; narrow stile aluminum door (1) with standard hardware at South stairwell entrance; demolition and removal of all existing glass and framing including overnight temporary weather protection.

Mason Consolidated Schools

As a result of the district not receiving the COPS Secure our Schools grant in the summer of 2008, we were not able to finance the installation of a much needed security camera system in our high school.

Mason Consolidated Schools

As a result of the building & site needs specified in a June 2007 Projects Study completed by John Kohler, Architect, PC and the fact that the voters in our school district failed to pass a sinking fund levy on two occasions in 2007, we are submitting projects totaling $10,554,565 (original estimate of $9,504,150 adjusted 10% for inflation + $100,000 for lighting to be installed along the driveways and parking lots). There are 8 pages of capital needs such as new windows in high school bldg; for all bldgs, interior & exterior doors, upgrading electrical, upgrade restrooms, repave driveways and parking lots, install sprinkler systems. 6/1/2009

T O

D VE $

627,600

$

18,400

8/31/2009

$

10,554,565

5/1/2011

$

55,613,500

5/1/2011

$

1,372,366

O R

6/1/2009

Funding Request

8/31/2009

Route (Infrastructure Only)

P P A

N s

Mecosta County Medical Center (MCMC) is proposing a shovel ready public works health care infrastructure project based on already completed architectural and engineering studies, community needs assessment, preliminary drawings, and cost estimates provided by David E. Johnson Architects. This project meets every goal in the Michigan Economic Recovery for Jobs MISSION STATEMENT • Provides 275-350 new jobs for the two years of construction. • Adds 110 – 150 future new permanent health care jobs in the Medical Center and related medical services in the region, and preserves 451 MCMC jobs. • The project can be started in 90 days with full disbursement in two years. • The three addition project will include a new laboratory, physician’s and specialty physician’s offices, a cancer and cardiac care, rehabilitation, and wellness center, an education center, a new critical care unit, pharmacy, outpatient care unit, single patient/family rooms, food service unit, and a high efficiency, green central energy plant. Centrally located in one of the most economically disadvantaged regions in Michigan Jobs For Michigan with Health Care for the (Kids Count 2008, Primary Health Care Profile of Michigan, 2006) MCMC was one ot T Economically Disadvantaged 5/1/2009 Mecosta County Medical Center (MCMC) is proposing a shovel ready public works health broadband infrastructure project based on already completed IT studies, community needs assessment, preliminary drawings, and cost estimates.. This project meets every goal in the Michigan Economic Recovery for Jobs MISSION STATEMENT • Provides 15-30 new jobs for the two years of construction. • Adds 2-15 future new permanent health care jobs in the Medical Center and related medical services in the region, and preserves 451 MCMC jobs. • The project can be started in 90 days with full disbursement in two years. • This project will include a complete upgrade to the existing Medical Center EMR to make it completely seamless, comprehensive, and integrated in the community. It will add both hardware and software to completely modernize the Medical Center EMR and provide patients with direct access to quality health care and to their own health care records. It will include Meditech modules for Home Health, Patient Access, and Jobs For Michigan with Health Broadband for Human Resources, Imedica patient access, physicians EMR support, Fiber from MCM the Economically Disadvantaged Centrally located in one of the most economically disadvantaged regions in Michigan (5/1/2009

t s e

u q e

Mecosta County Medical Center

Big Rapids, Mecosta County

R d

e t tt

i m

b u S Mecosta County Medical Center Big Rapids, Mecosta (Owned by the County) County

02262009

Submitted Requests - Not Approved

1004 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Meridian Magnesium Products of America

Eaton Rapids

Lighting upgrade

replace inefficient lighting in production areas with efficient

Meridian Magnesium Products of America

Eaton Rapids

Heat capture

Install air to air heat exchangers in exhaust streams and recapture heat

Meridian Magnesium Products of America

Eaton Rapids

Capacitor installations

Install capacitors to level power factor and reduce KW and demand

Meridian Magnesium Products of America

Eaton Rapids

Motor Control

Install motor controls to reduce motor KW when unloaded

Meridian Magnesium Products of America

Eaton Rapids

Solar panels

Install solar panel on roof of Plant.

Township Hall Expansion and Renewal

The existing Township hall was constructed in the 1970's. No significant improvents have been completed since that time. The existing building contains all of the Township services and does not have adequate space for elections and the township board, planning commission and committee meetings. The existing multi-purpose room only has capacity for about 40 people and is also used to store voting equipmen and other township items. The room does not have provisions for any audio or visual equipment and has poor acoustics making it difficult for the board and audience to understand each other. The existng offices have inadequate equipment and furnishings. The existing record storage area is full and more secure storage is needed. The Township has planned a 1,200 sft addition to expand and renovate the multipurpose room, add a bathroom, install energy efficient windows, increase the size of the record storage vault and update 4 offices and 6 workstations with new equipment and furnishings. The plans have been completed and the project is ready to be bid. The only permits necessary are construction permits that must be obtained 5/15/2009

Funding Request

$

T O

450,000

D VE $

500,000

$

500,000

$

600,000

$

1,500,000

10/15/2009

$

300,000

12/1/2009

$

9/1/2009

$

59,830

9/1/2009

$

128,818

6/1/2009

9/1/2009

$

130,000

6/1/2009

9/1/2009

$

408,189

O R

P P A

Route (Infrastructure Only)

N s

Oronoko Township

Oronoko Charter Township

t s e

u q e

The Band is committed to building a tribal administration building to provide member services including education, social services, enrollment, housing, elections and tribal operations. The 20,000sft building has been awarded under a design build contract and includes numerous sustainable design elements including green roof, LED street lights, instantaneous hot water heaters, low flow fixtures, low VOC materials, FSC lumber, prairie restoration, native plants etc. The project also includes renovation of the onsite wastewater lagoons and the installation of new potable and fire protection wells. The Band would like to further improve the energy efficiency of the building by installing a geothermal heating and cooling system and using more energy efficient interior lighting. Additional skylights would be added to increase the daylight into interior spaces. Lastly, interactive educational displays would be added so the facility could be LEED rated and used as a showcase for others in the region to follow. The design development drawings are complete and the design builder is obligated to com5/1/2009 Local road improvement project Gady Rd - Occidental to Raisin Center 0.98 miles of road length 6/1/2009 Local road improvement project Centennial Rd from Rogers to East line 2.11 miles of road length 6/1/2009

R d

Pokagon Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

S

Raisin Township

Raisin Township

Raisin Township

Raisin Township

02262009

i m

ub

Pokagon Band of Potawatomi Indians

e t tt

Tribal Administration Building

Twp Community Center Energy /Ada Compliance projects - Change roof line and upgrade building to ADA standards while meeting compliance with the Michigan Energy Code Local road project rebuild Ives Rd - Occidental to Raisin Center 0.95 miles of road length

Submitted Requests - Not Approved

3,760,000 NA

1005 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Raisin Township

Richland Township

Richland Township

Saline Area Schools

Saline Area Schools

Saline Area Schools

Saline Area Schools

Project Name

Start Date

Funding Request

Local road project rebuild - Sutton Rd Rogers Hwy to Ridge 1.757 miles of Rd length 5/1/2009 Local road project rebuild Raisin Center Suttom to Laberdee 2.018 miles of road length 5/1/2009 Early warning sirens with associated hardware and software for citizen early warning /homeland security 4/15/2009

9/30/2009

$

754,934

9/30/2009

$

867,079

$

364,330

10/30/2009

$

79,366

$

109,892

10/30/2009

$

125,000

10/30/2009

$

341,597

10/30/2009

$

1,031,214

Raisin Township

Local road improvement project Gady Rd from M-52 East 1.3 miles of road length 6/1/2009 Local road improvement project Pocklington Rd, Rogers to East line 1.8 miles of road length 6/1/2009 Bring all entrances into Park, and Park structures into ADA compliance and meet Michigan energy code 6/1/2009 Upgrade Twp administration offices, Fire and Police complex to Michigan energy code standards 6/1/2009 Local road project rebuild Wilmoth Hwy, Sutton to Academy Rd 2.4 miles of road length 6/1/2009 Township annex structure Upgrade building to meet Mich Energy code and ADA conpliance 6/1/2009

11/15/2009

$

240,967

Richland Township

Health and Wellness Path to Town

A health and wellness walking path connecting the Richland township park with the sidewalks of the Village of Richland which would create a 5 mile safety walking path for residents of the township and surrounding areas.

5/9/2009

7/9/2009

$

Richland Township

Richland Township Fire Department

To purchase new and repair existing fire trucks for the Richland Township Fire Department. Current calls for assistance have increased two-fold over the past few years and the need for trucks and fire fighters has risen to new levels. If increase continues movement toward full time fire fighters will be required.

5/9/2009

dept 09

$

450,000

City of Saline and Pittsfield Township

Plant trees and bushes to create wind breaks on campus near buildings to help reduce wind effect on heating of buildings and walking areas. Increase parking for Saline Area Schools - Saline High School and overflow lot to provide less parking on green areas and to help alleviate traffic flow Woodland Meadows during school and after school events.

9/9/2009

A T

e u

st

s

O N

10/30/2009

PP

O R 10/30/2009

D VE

6/10/2009

$

227,000

City of Saline

Saline Area Schools - Middle Schools

9/9/2009

$

567,000

City of Saline and Pittsfield Township

Security System for Saline High School and Saline Middle School. Reduction of administrative and support personnel makes monitoring the hallways impossible and Saline Area Schools - Saline High and Middle new security system. High School system would be expanded to include athletic Schools facilities and the Middle School would be a new stand alone system. 7/9/2009

itt

d e t

9/9/2009

$

230,000

Saline Area Schools - Middle Schools

Joint project with Saline Area Schools and Saline Senior Center. Create new entrance for secondary access to the Senior Center for parking lot for traffic flow and emergency access. New Water and Sewer infrastructure that will meet current local and state standards. 8/9/2009

11/9/2009

$

42,000

Saline Area Schools - All Buildings

Replacement and new energy controls for all buildings. CO2 monitors will be added to the large spaces within the buildings to evaluate the need for fresh air to the space and provide energy savings. Occupancy sensors will be added to classrooms and common areas to automatically shutoff the lights after 10 minutes of inactivity. Interface occupancy sensors with HVAC system to further control heating of rooms when not in use. Replace old furnaces with energy efficient furnaces at Pleasant Ridge Elementary and Houghton Elementary. Replace domestic water and steam piping system at Liberty School to new energy efficient system. Original system is stil in place in the building from the 1940's. TBD

TBD

$

2,004,000

m b u

City of Saline

City of Saline and Pittsfield Township

02262009

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

32nd Street, 90,000 Richland Mi.

Joint project with the Saline District Library, Saline Area Schools and Saline Senior Center. Relocate entrance and parking lot for traffic flow safety reasons. New Water and Sewer infrastructure that will meet current local and state standards. Middle school was converted from old high school and current traffic pattern has safety concerns for younger students. 6/9/2009

S Saline Area Schools

Project Description

Expected Completion Date

1006 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

St. Clair County

Kimball Township

Septage Bioreactor

The Septage Bioreactor project, first of its kind, combines domestic septage with municipal solid waste. This project includes: promotion of energy sustainability and efficiency; generation of renewable green electric power; environmentally safe disposal of septage; extension of the service life of the existing county-owned landfill; destruction of greenhouse gases; promotion of recycling; improvement of wetlands; building of local markets for skilled green construction jobs; and promotion of higher education in green energy. Now

Summerfield Schools Summit Township

Petersburg, Michigan Monroe County Summerfield Township Summit Twp

high school window replacement Non-motorized Trails New

Replace all windows in high school building Construct 5.04 miles of new trails

AMR

Install infrastructure for an AMR system targeting Senior Citizens and low income customers in our service territory. This would allow us as an utility to better "keep tabs" on the most vulnerable.

fall 09'

spring 10'

40kv reconductor

rebuild and reconductor 11 miles of 41.6Kv line between our Caro and Vassar substations. Current conductor size results in system losses due to the load current and the high resistivity of the smaller conductor. Installation of larger conductor will result in significant savings in losses.

summer 09'

spring 10'

ASAP

Thumb Electric Cooperative

Thumb Electric Cooperative

Ubly

Caro

Summer 2009 71/2009

T O

24 months

P P A

O R

-N

Fall 2009 11/1/2009

Funding Request

Route (Infrastructure Only)

D VE $

20,200,000 N/A

$ $

250,000 2,500,000

2010

$

4,000,000

United Way 2-1-1

Statewide

Complete 2-1-1 project

This project will expand existing capacity of 2-1-1 capability from a limted coverage area to Statewide coverage and benefit information dissemination activities for job seekers, job training, human services, and other State governmental programs.

Village of Britton Village of Britton Village of Britton

Britton Michigan Britton Michigan Britton Michigan

Paving Improvements Well House Park Restrooms

Double chip-seal surface of major and secondary roads, 15,466 square yards Replace inefficient 12 foot x 18 foot will house Construction of solar powered ADA compliant restrooms

2009 2009 2009

2009 2009 2009

$ $ $

75,000 250,000 274,000

Village of Britton

Britton Michigan

DPW Building

Construction of 600 square foot maintenance facility for repair and operations of Department of Public Works, to replace existing 80 year old inefficient barn.

2009

2009

$

400,000

Village of Britton Village of Britton Village of Britton Village of Britton Village of Mayville

Britton Michigan Britton Michigan Britton Michigan Britton Michigan Mayville

N. & S. Main St. Park Path Lagoon Water Tower Industrial Park Entrance

Complete reconstruction of N. & S. Main Sts. Curb and gutter, upgrade drainage, sidewalk improvements, manhole adjustments and upgrade water main Excavate and pave a 3 mile walking path around the Village Park One Acre wastewater lagoon system Purchase of a 250,000 gallon water tower to upgrade existing water towe Entrance on M-24 to access the Industrial Park.

2009 2009 2010 2010 4/1/2009

2009 2009 2010 2010 5/30/2009

$

2,900,000

$ $ $

750,000 1,200,000 36,000 M-24

Whiteford Agricultural School District

Ottawa Lake, MI

Whiteford Agricultural School District

Replacement of side walls in outside storage building due to deteriorating conditions. 6/9/2009

9/9/2009

$

73,000

Whiteford Agricultural School District

Ottawa Lake, MI

Whiteford Agricultural School District

Remove & replace asbestos floor tile in Middle/High school building.

6/9/2009

9/9/2009

$

120,000

Whiteford Agricultural School District

Removal of floor in large High School science room and adjacent storage room/hallway in order to remove underground storm drain. Inspection of roof drains where they intersect with underground 10" storm drain. Repair of all drains and restoration of classroom and adjacent area floors.

6/9/2009

9/9/2009

$

141,000

u S

d e tt

it

bm

s t s

e u

q e R

Whiteford Agricultural School District

Ottawa Lake, MI

Whiteford Agricultural School District

Ottawa Lake, MI

Whiteford Agricultural School District

Replace 50+ year old septic tank and leach field at Elementary School

6/9/2009

9/9/2009

$

155,000

Whiteford Agricultural School District

Ottawa Lake, MI

Whiteford Agricultural School District

Replacement of outside windows at elementary building/all classroom exit doors.

6/9/2009

9/9/2009

$

189,000

02262009

Submitted Requests - Not Approved

1007 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Whiteford Agricultural School District

Ottawa Lake, MI

Whiteford Agricultural School District

Roofing Repair, - High School roof valley where gymnasium roof connects to main building, north side classrooms near Middle School where roof lines intersect, extreme east end of Middle School where roof lines converge 6/9/2009

Whiteford Township

Whiteford Township, Monroe County

Whiteford School Complex water system

The School complex is within the same aquifer that E-Coli has been documented by MDEQ. This water line brings public potable water to the school complex.

Immediate

9/1/2009

Water System

Water lines due to E-coli in area aquifer, (see attached letter), businesses unable to afford separate water filteration systems. This brings safe, public potable water to the area Immediate

9/9/2009

Ottawa Lake Sewer System

Sewer System for a unicorporated town, failed septic systems within town

Statewide Broadband Network

Develop a statewide broadband superhighway (backbone) with off ramps throughout the state that will serve the unique broadband needs of communities throughout Michigan. The superhighway will be large enough to serve the needs of the state and local governments, schools, libraries, intelligent transportation system, businesses and citizens throughout Michigan. Existing capacity along the superhighway will be encouraged to be part of the superhighway, thereby leveraging that capacity and reducing the overall cost of the highway. The underserved/unserved areas of the state could use an off ramp from the broadband superhighway close to their community to limit the overall cost of getting broadband. Those communities that collaboratively look at all the broadband needs of the community/region will have the greatest degree of success. The vendor community will play a vital role in this program. ASAP

Whiteford Township Whiteford Township

Whiteford Township, Monroe County Whiteford Township, Monroe County

T O

MDIT

Statewide

9/9/2009

O R

6/9/2009

11/1/2009

Funding Request

$

D VE $

1,900,000

$

5,000,000

$

2,500,000

2011

$

TBD - New construction may be needed in unserved and 423,000,000 underserved areas

$

TBD - Interfaces between HIEs,Physician Offices and Hospitals/Labs/Pha rmacies, and connections between MPI and payers/public health/government 80,000,000 programs

t s e

Michigan will use these funds to support a statewide public-private backbone to support essential HIT services such as a Master Patient Index and Record Locator Service. Being able to provide these services through one statewide solution would allow Michigan to move forward considerably with our HIT and exchange programs. The state infrastructure would support the interfaces to physician offices, hospitals, labs, and pharmacies, a Record Locator Service with a Master Patient Index, Privacy and Security and a messaging gateway. This type of infrastructure would be the efficient and effective statewide delivery and expansion of the following types of services; public health messaging, real-time disease surveillance, immunization registry, e-prescribing, interfaces, patient/population registries, and many other HIT applications that can transform healthcare. It is possible to contract with a vendor and begin work within 120 days of authorization. ASAP

2011

To accelerate the adoption and use of HIT, the state will implement an Electronic Health Record(EHR) loan program for health care providers to purchase and enhance certified technology and improve the secure exchange of health information. ASAP

N/A

u q e

MDCH

MDCH

Statewide

R d

e t t

it

m b u

Statewide

Electronic Medical Record Loan Program

232,000

P P A

N s

Shared Solutions Health Information Technology

Route (Infrastructure Only)

N/A

S 02262009

Submitted Requests - Not Approved

1008 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

All Local/State/Federal Government, Hospitals, Schools and other related Public Safety support for Michigan citizens covering all geographic areas of Michigan Public Safety Communications the State. System Lifecycle Remediation

The Michigan Public Safety Communications System (MPSCS) is a state owned and operated state-wide wireless communications system providing interoperable public safety communications in all eighty-three counties of the state and also connects with Ohio and Wisconsin for regional interoperability. The MPSCS provides first responder radio, voice and data, communications for Local, State, and Federal agencies throughout the state with the purpose of protecting the citizens of Michigan. The MPSCS has been operating for over a decade and requires upgrades and equipment replacement to ensure seamless and sustainable first responder radio communications to continue. The replacement of MPSCS communications technology, of which is no longer supported by the manufacturers or will soon be no longer supported by the manufacturers. The communications technology that the MPSCS is comprised of has defined life-spans comparable to other complex technology such as computers, servers, and network equipment. The MPSCS equipment replacement and upgrade (both software and hardware) is at all levels of complex technology with the state-wide public safety communications infrastructure. TASAP

MDIT

All Local/State/Federal Government, Hospitals, Schools and other related Public Safety support for Michigan citizens covering State of Michigan/Michigan Public Safety all geographic areas of Communications System 700 MHz the State. Incorporation

This project will provide the infrastructure capabilities to leverage the 700 MHz spectrum providing increased wireless broadband capabilities to the state-wide Michigan Public Safety Communications System for the Local, State, and Federal agencies utilizing the state-wide interoperable communications system. With the release and assignment of the 700 MHz frequencies to the regions within Michigan the infrastructure investment will bring large scale interoperable communications in a spectrum assigned by the FCC for public safety and citizen protection. The infrastructure components will enable additional multi-state preparedness for interoperability in a frequency band allocated for communications and wireless broadband and leveraging an existing platform for utilization by transportation communities, public safety communities, health care all under the direction of a point to point and point to multipoint wireless capability. ASAP

MDIT

Technology will be installed in Michigan's existing UI call center locations (Detroit, Grand Rapids, Saginaw). Likewise, the technology infrastructure (servers, storage, telecommunications) can be moved from the IBM hosting facility in Boulder, into a Mic Unemployment Insurance system re-write

MDIT

Expected Completion Date

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE $

TBD - Existing backbone infrastructure in 36,000,000 place.

2011

$

TBD - Existing backbone infrastructure in place, additional construction maybe needed in remote areas of the State for 700 MHz 56,000,000 opportunities

Michigan's unemployment insurance benefit system is over 20 years old. The system is mainframe based and uses technology components that are dated. This project wil replace the mainframe application with server based infrastructure technology and open system design that allows system modifications. System expansions and systems changes will occur faster and cheaper. This same modernization project will better integrate UIA call centers with the eligibility application and provide more selfservice options for claimants. ASAP

2013

$

35,000,000 N/A

GIS - Imagery

Seek funding to develop a statewide imagery database. Imagery for the Nation (IFTN) is an intergovernmental initiative to address the nation’s basic business needs for aerial images. Imagery is used for countless applications in all levels of government and the private sector, embraced by the public through online tools. Imagery is an under-pinning data set to a host of initiatives, ranging from public safety, road construction, to economic development. ASAP

2011

$

7,000,000 N/A

GIS - Parcel Data

Seek funding to work with local equilization departments to develop a statewide land parcel database. Land parcel data is used by governments to make decisions on land development, business activities, regulatory compliance, emergency response, and law enforcement. ASAP

2011

$

9,000,000 N/A

T O

N s

t s e

2011

u q e

R d

MDIT

MDIT

e t tt

i m

Statewide

Statewide

02262009

b u S

Submitted Requests - Not Approved

1009 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

MDIT Alpena Community College Alpena Community College

Bay College

Central Michigan University

Project Name

Project Description

Start Date

Seek funding to develop a statewide elevation database. Digital elevation is used in flood mapping, natural resource management, transportation, emergency response, and homeland security purposes. 39,000 sq. ft. Training Center for existing, emerging, sustainable, & green technologies 6,564 sq. ft. Computer classroom, Library, & Laboratory for concrete & green technology research & teaching

Escanaba (Delta County) Nursing Renovation

Major renovations in labs and lecture hall to more advanced teach methodologies, technology and critical skills necessary to enhance learning in a high need/high pay sector of the economy. (nursing)

7/1/2009

Mt. Pleasant, MI

This project request is for an important new facility that will allow CMU to offer competitive 21st century bio-tech and allopathic medical education programs. The proposed 126,000 gsf building will cost $75,000,000. The new facility will provide flexible, globally competitive state-of-the-art research and learning spaces that will house laboratories, instrumentation, examination rooms and teaching facilities. The sustainable building systems implemented on this project, including high-end hood and control technology, will reduce the annual cost of operations by 25% over current science facilities. The new research laboratories will have the required infrastructure and technology to promote joint projects involving the basic and medical sciences as well as our hospital affiliates, physicians, and research corporations. The research and training in biotechnology, biomedical sciences, and medicine that will take place in the new facility will extend Michigan's bioscience corridor north, contributing to Michigan's established economic goals. The facility will allow CMU to train physicians and address the predicted shortage of 6,000 physicians in Michigan by 2010, especial 7/15/2009

Statewide Alpena

GIS - Elevation Electrical Power Technology Education & Training Center

Alpena

Lefarge N. America Training Center

ASAP

2011

8/1/2009

3/1/2010

8/1/2009

3/1/2010

Funding Request

$

$

1,600,000 Parking Lot, Road

$

1,200,000

7/15/2011

$

75,000,000

This request is for an addition to CMU’s Health Professions Building, which will house the new Medical Education Program. The proposed 48,000 gross square feet addition will cost $19,900,000 and will be used by students during the first two years o their medical education program leading to the MD degree. The remaining two years will be spent in a hospital setting where basic science is applied to the clinical setting. The addition will include small group learning and resource labs, examining rooms, medical microbiology labs, a patient simulation suite, auditorium, dean's suite, and faculty offices. Rationale: Both Michigan's population and Michigan's physicians are aging, leading to a predicted shortage of 6,000 physicians in Michigan by 2010. This facility will allow CMU to train physicians to help meet this demand, especially in underserved areas of northern lower Michigan and the upper peninsula. The physicia shortage is expected to be most critical in internal medicine, family practice and OB/GYN. This facility will allow CMU to offer a rurally-focused medical education program, and will be a continuing education resource for regional doctors. The $23,007/15/2009

7/15/2011

$

19,900,000

This project request is for a biomass fired cogeneration facility that will produce 160,000 lb/hr of high pressure steam to generate 147,000 megawatt hours of “green” electricity annually, produce an estimated 147,000 renewable energy credits (REC’s) per year, and generate 2,500 tons of air conditioning capacity from steam absorption chillers at a cost of $65,000,000. The “green” electricity generated would be available to meet Michigan’s 10% Renewable Portfolio Standard (RPS) signed into law by Governor Granholm in October 2008. The new facility would require six new positions at CMU to operate and maintain the facility, and 40 new jobs in the community to supply wood to the plant. The estimated $6,900,000 expenditure for fuel would remain in mid-Michigan. The installation of this carbon neutral facility would lower CMU’s carbon footprint by 75% or 60,000 metric tons per year (2007 base year), giving CMU one of the lowest carbon footprints of any major university in the United States. Note that the only construction that could commence immediately would be site preparation a Michigan Department of Environmental Quality air permit is required before actual fa7/15/2009

7/15/2011

$

65,000,000

O R 12/30/2009

$

Route (Infrastructure Only)

10,000,000 N/A New Road, Parking 7,500,000 Lot

T O

D VE

P P A

N s

Bio-technology Building

Expected Completion Date

t s e

u q e

Central Michigan University

Mt. Pleasant, MI

e t t

Health Professions Building Addition

t i m

b u S Central Michigan University

Mt. Pleasant, MI

02262009

R d

Biomass Cogeneration Facility

Submitted Requests - Not Approved

1010 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Central Michigan University

Mt. Pleasant, MI

Project Name

Project Description

Start Date

Anspach Hall Infrastructure Upgrade

This project request is for building infrastructure upgrade and targeted re-purposing of space in Anspach Hall, one of the oldest and most strongly utilized classroom buildings on campus. The $14,000,000 project would rehabilitate and address deferred maintenance needs in the 133,011 gsf building, originally constructed in 1966. Infrastructure improvements would include upgrades to HVAC, upgrades to mechanical and electrical utilities servicing the building, and replacement of windows, roofing, doors, flooring and fiber optics. Sustainable design practices implemented on this project will increase occupant comfort and control, and will deliver an estimated annual energy savings of 40%. 7/15/2009

4/1/2009

$

250,000

3/1/2009

5/1/2009

$

30,000

4/1/2009

10/1/2009

$

730,000

10/1/2009

2/1/2010

$

80,000

Replace and enhance Lighting/HVAC/ and windows to increase energy efficiency.

10/1/2009

2/1/2010

$

350,000

Replace and enhance Lighting/HVAC/ and windows to increase energy efficiency.

10/1/2009

2/1/2010

$

350,000

8/15/2009

$

395,000

P P A

Lansing

Maintenance Storage Building

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing/Delta Twp

Appletree Home Renovations

To bring a Respite Home, for children with emotional disturbance, into ADA compliance, thus avoiding unnecessary use of inpatient care.

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Holt/Delhi Twp

Willoughby Rd Construction

New construction: Specialized Residential Home for Adults with Developmental Disabilities

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing

Jolly Rd Lighting Renovations

Enhancing the lighting and electrical systems.

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Lansing

520 Cherry St. HVAC / Lighting/ Windows Renovations

Lansing

606 Shiawassee. HVAC/ Lighting/ Windows/ Renovation

University Center (Midland, Bay City, Saginaw Area) / Frankenlust Township Bay County

This project would be part of our ongoing life cycle replacement of existing roofing and repairs to adjacent plaster fascia & soffit areas. The project would include the complete tear off of one single membrane roofing system and the original tar and gravel roofing system. The new roofing systems would be a white single membrane and include additional insulation. The project will be designed and constructed in accordance with the LEED Green Building Rating System. The work would also Roof Replacement / Fascia & Soffit Repairs to include new aluminum metal roof coping and repairs to the adjacent plaster fascia & C, D & E wings soffits. 4/14/2009

Delta College

02262009

T O

s t s

-N

e u

q e R

t i m

b u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

14,000,000

Storage Building to house Maintenance Supplies for servicing 50 plus properties owned by Community Mental Health Authority - supplies now stored at scattered sites throughout the tri-county region. Will greatly reduce transportation required to retrieve supplies - and thus unnecessary use of gasoline. 1/1/2009

d e tt

O R 7/15/2011

Funding Request

$

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Community Mental Health Authority of Clinton, Eaton, and Ingham Counties

Expected Completion Date

1011 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Delta College

Delta College

Delta College

University Center (Midland, Bay City, Saginaw Area) / Frankenlust Township Bay County

University Center (Midland, Bay City, Saginaw Area) / Frankenlust Township Bay County

University Center (Midland, Bay City, Saginaw Area) / Frankenlust Township Bay County

Project Name

Project Description

Start Date

Expected Completion Date

Delta Drive Street Improvements

This project would be part of our ongoing life cycle repair and replacement of existing bituminous paving. The project will include: 1) The complete reconstruction of approximately 1,800 lineal feet of road including storm sewer adjustments and new street lighting. 2) Redesign of the Delta Road entry as a boulevard with lane widths to allow truck turning movements. 3) New entry sign and landscaping. 4) Upgrades to a parking area for approximately 50 cars including lighting with turning movements designed for school buses for drop off area for site visits. 5) The upgrades will be designed and constructed in accordance with the LEED Green Building Rating System for sites. The design will include the reuse of existing materials as base for the proposed paved areas and sustainable storm water management. 4/14/2009

O R

Funding Request

D VE

11/15/2009

$

895,000

Chiller Plant Upgrades

This project would upgrade our existing 1,850 ton chiller plant from: 1 - 350 ton Absorption Chiller, 2 - 750 ton Centrifugal Chillers and 54 ice storage tanks (9000 tonhours) to: a 3,000 ton chiller plant with 4 - 750 ton Centrifugal Chillers and 81 ice storage tanks (13,500 ton-hours). The project would also include the upgrade of related pumping systems, cooling towers and electrical components to support the new plant. The capacity of the existing chiller plant is not able to meet the facility cooling needs on design days. This requires shutting down some areas so cooling can be maintained in the critical areas. The additional ice storage tanks will also provide significant energy savings by reducing and / or eliminating the need to run a chiller during the peak electrical demand periods. The upgrades will be designed and constructed in accordance with the LEED Green Building Rating System. 7/14/2009

6/30/2010

$

2,650,000

Emergency - Backup Generator Power System

This project would provide emergency - backup power for the entire campus replacing several smaller generators and battery systems. The system would include (2) 2000 kw 8.32 kv rated diesel fueled emergency generators. One generator would serve the East primary loop serving N,M,P, TV building, L, K, H and S unit substations. The other generator would serve the West primary loop serving the Boiler House, Chiller, F, E and C unit substations. The generators would be connected to the existing Boiler House high-voltage switches currently serving the East and West campus primary loop distribution, through transfer switches, with automatic start and load transfer in the event of a loss of utility power. 7/14/2009

6/30/2010

$

2,510,000

This project would replace the outdated planetarium theater projection systems. Critical components of the system are no longer manufactured or supported. The Digistar III system is a more easily upgraded and maintained system, using off-theshelf PCs, rather than custom designed hardware. The dome projected video images would wrap 360-degrees around the audience, surrounding them in the experience. With full dome capability, we can expand our offerings and audience by providing "additional services" to the College and the community. Students could study systems within the human body, tour the universe, or whirl into the center of a tornado, which could all be shown on the full dome screen. The upgrade to the new Digistar III projection system would: expand Delta College's educational outreach within the Great Lakes Bay Region; provide a regional attraction to support tourism; promote learning to people of all ages and cultures; enhance community knowledge of space and its exploration; and provide opportunities for educational and community 7/14/2009 Digistar III - Planetarium Equipment Upgrade partnerships.

6/30/2010

$

1,300,000

T O

P P A

N s

t s e

u q e

R d

Route (Infrastructure Only)

e t t

t i m

b u S Delta College

Bay City

02262009

Submitted Requests - Not Approved

1012 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Delta College

Delta College

DMB

DMB

DMB

University Center (Midland, Bay City, Saginaw Area) / Frankenlust Township Bay County

University Center (Midland, Bay City, Saginaw Area) / Frankenlust Township Bay County

Secondary Complex Lansing (Eaton County)

Project Name

Project Description

Water Tower OSHA Upgrades and Maintenance Painting

This project provides safety and maintenance upgrades to our existing 200,000 gallon water tower. The water tower provides backup for our drinking water supply and fire protection for the college. The work includes: 1) the removal of the existing lead based paint on the tank's exterior inside a tight flexible-frame containment system, and recoating with a four coat polyurethane system. 2) the removal of the entire dry and wet interior paint, and recoating with new two and three coat epoxy polyamide systems. 3) general maintenance repairs. 4) safety upgrades to comply with OSHA requirements for rescue / retrieval operations including replacing hatches with 30 in. hatches, installing a 42 in. high railing and a painter's rail on the roof, safety grabs on the exterior roof for fall protection of workers in the wet interior. 7/14/2009

Health and Wellness Programs - F-Wing

295,000

This project will include renovation and upgrades to approximately 91,500 square feet of space to support our Allied Health and Nursing programs. The renovations and upgrades will be designed and constructed in accordance with the LEED Green Building Rating System and we will strive to obtain a score for the project of Platinum on the LEED Existing Buildings Scorecard. Specific program elements affected include Radiology, Microbiology, Dental Hygiene, Dental Assisting, Respiratory Therapy and Surgical Technology. Other elements of the project will include a Health Promotion and Awareness Clinic, Multi-Disciplinary Health Laboratory, Multi-Discipline Simulation Rooms, Critical Care Simulation Area and Multi-Media Laboratory/Video Slide Room. This project will expand opportunities for students in nursing and allied health programs to meet the growing needs of our communities for skilled health care professionals. 1/15/2010

12/31/2011

$

13,500,000

Construct a LEED certified State Emergency Operations Center (SEOC) addition to an existing state-owned Michigan State Police training academy. The addition will provide a statewide coordination of homeland security and emergency management. The new SEOC consolidates functions and addresses unmet warehousing needs. Energy improvements and repairs to the MSP-Training Academy are also included; such as building wide air handling units, non functioning dorm room heating units, bathrooms, deteriorated piping, and elevator upgrades. MSP has received a federal grant of $1.0 million for the EOC portion of the project that reduces the needed funding from $20.0 million to $19.0 million. 6/1/2009

5/1/2011

$

19,000,000 N/A

LEED certified building wide upgrade of life safety systems, ADA and code requirements including energy efficiencies, lighting, heating, ventilation and air conditioning, ceilings, hazardous materials abatement, fire systems including upgrades to the reporting systems in Central Control, bathrooms and building piping, furniture, carpeting, painting, etc. 7/1/2009

6/1/2011

$

16,000,000 N/A

LEED certified building wide upgrade

LEED certified building wide upgrade of life safety systems, ADA and code requirements including energy efficiencies, lighting, heating, ventilation and air conditioning, ceilings, hazardous materials abatement, fire systems including upgrades to the reporting systems in Central Control, bathrooms and building piping, furniture, carpeting, painting, etc. 7/1/2009

6/1/2011

$

17,000,000 N/A

Completion of the Secondary chilled water loop

Construct the third phase of the Secondary Complex chilled water loop. This will complete the chilled water loop and increase energy efficiency of the loop by maintaining consistent water delivery temperatures.

7/1/2009

6/1/2011

$

5,000,000 N/A

Digital Heating Ventilation and Air Conditioning Controls to a Tridium Niagra platform to provide energy savings and efficiencies to DMB facilities. 7/1/2009

6/1/2011

$

6,000,000 N/A

T O

P P A

N s

t s e

u q e

R d

Statewide Emergency Operations Center addition

e t tt

i m

DMB

Secondary Complex Lansing (Eaton County)

DMB

Capital Complex-Lansing, Secondary ComplexLansing(Eaton County) Energy saving digital control installation

02262009

D VE $

ub

S

O R

Funding Request

Route (Infrastructure Only)

6/30/2010

Flint State Office BuildingFlint, Genesee County LEED certified building wide upgrade

Mason BuildingDowntown Lansing

Start Date

Expected Completion Date

Submitted Requests - Not Approved

1013 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DMB

DMB

DMB

VanWagoner BuildingDowntown Lansing

Williams BuildingDowntown Lansing MDOT Construction and Technology BuildingSecondary Complex, Lansing (Eaton County)

Project Name

Project Description

Start Date

LEED certified building wide upgrade

LEED certified building wide upgrade of life safety systems, ADA and code requirements including energy efficiencies, lighting, heating, ventilation and air conditioning, ceilings, hazardous materials abatement, fire systems including upgrades to the reporting systems in Central Control, bathrooms and building piping, furniture, carpeting, painting, etc. 7/1/2009

Energy efficient building perimeter heating system

New energy efficient building perimeter fin tube heating system replacement. The current fin tube system is undersized and inefficient at most office locations. Adding insulation in this project would reduce thermal heat loss and reduce the risk of the piping freezing during colder temperatures.

LEED certified building wide upgrade

LEED certified building wide upgrade of life safety systems, ADA and code requirements including energy efficiencies, lighting, heating, ventilation and air conditioning, ceilings, hazardous materials abatement, fire systems including upgrades to the reporting systems in Central Control, bathrooms and building piping, furniture, carpeting, painting, etc. 7/1/2009

$

1,000,000 N/A

6/1/2011

$

10,000,000 N/A

7/1/2009

6/1/2011

$

26,500,000 N/A

7/1/2009

6/1/2011

$

20,000,000 N/A

Construct a new LEED certified Department of Information Technology Hosting Center at a new site, to be determined, or at the current state-owned Secretary of State Building site. The current facility is out of space, power and cooling, and will require extensive upgrades to meet reliability and scalability requirements. The current facility does not meet growing operational needs; a new facility will include requirements for future expansion. This initiative leverages the state's investment as an economic development effort that will lower business expenses and attract technology/computer hosting companies to Michigan. Several universities and local governments have agreed to partner in this initiative. 7/1/2009

6/1/2011

$

100,000,000 N/A

Gaylord- Otsego County

New LEED certified State regional office building

DMB

Western Wayne Correctional FacilityWayne County

Remediation and demolition of a former Correctional Facility

Remediation and demolition of the former Western Wayne Correctional Facility, resulting in the state surplus land made ready for disposition and redevelopment.

DMB

Jackson State Office Building- Downtown Jackson Williams BuildingDowntown Lansing, VanWagoner BuildingDowntown Lansing, Ottawa BuildingDowntown Lansing, Hannah BuildingDowntown Lansing,

DMB

Saginaw and Jackson State Office BuildingsSaginaw County Jackson County

e u

eq

6/1/2011

R d

e t tt

i m

Restroom energy efficiency, water reduction and code upgrades

Restroom update for energy efficiency, water reduction and current code and ADA requirements. Replace building piping systems that have frequent backups and leaks. 7/1/2009

6/1/2011

$

4,000,000 N/A

Building elevator replacement

Elevator replacement including life safety, ADA and code upgrades. Equipment is pas useful life and parts are no longer manufactured requiring custom parts that are difficult to obtain and costly to purchase. This has increased the cost to maintain these units and resulted in extended elevator downtime when repairs are needed. 7/1/2009

6/1/2011

$

2,000,000 N/A

b u S

02262009

s t s

-N

O R

7/1/2009

P P A

DMB

DMB

D VE

20,000,000 N/A

T O

6/1/2011

Funding Request

Route (Infrastructure Only)

$

New LEED certified State Regional Office Center. This project is a new state-owned building consolidating and eliminating regional leased space into one building providing space, energy and operational efficiencies, telecommuting opportunities, and controlling long-term costs.

Existing Secretary of State Building- Secondary Complex, Lansing (Eaton New LEED certified State Department of County) Information Technology Hosting Center

Expected Completion Date

Submitted Requests - Not Approved

1014 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

DMB

DMVA Surplus FacilityLansing, Ingham County

Building renovation and expansion

The current state and federal surplus program is housed in temporary space provided by DMVA. This arrangement expires within the next year. Other departments, such as DNR, have asked to co-locate heavy equipment and related offices with DMB. Since DMVA wants to vacate the property eventually, this project would transfer ownership of the property to DMB, reimburse DMVA for associated assets, and renovate and remodel the building for appropriate use. 7/1/2009

DMB

Flint, Saginaw, Jackson, Grand Rapids, Traverse City, and Escanaba

Building fall protection

Safety fall protection installation to ensure safety of workers and comply with current health and safety codes. 6/1/2009

DMB DMVA

Michigan Library and Historical CenterDowntown Lansing Statewide

Building exterior tuck pointing and stone replacement Armory IT Project - Army Guard Title IV

Exterior building tuck pointing and replacement of damaged stone. The mortar joints are failing and are causing water infiltration inside the building. This has lead to damaged building interior. 7/1/2009 IT infrastructure construction at armories statewide 7/1/2009

DMVA

Baraga

DMVA

Baraga

DMVA

Charlotte

DMVA

Grand Ledge

DMVA

Grand Ledge

DMVA

Kingsford

DMVA

Kingsford

DMVA

A T

6/1/2011

O R 6/1/2011

Funding Request

D VE $

8,000,000 N/A

$

1,500,000 N/A

2,000,000 N/A 1,000,000

PP

6/1/2011 N/A

$ $

3/1/2009

N/A

$

300,000

3/1/2009

N/A

$

200,000

7/1/2009

N/A

$

150,000

3/1/2009

N/A

$

500,000

3/1/2009

N/A

$

250,000

3/1/2009

N/A

$

1,000,000

3/1/2009

N/A

$

200,000

Lansing

Baraga Energy Project - Army Guard Title IV Roof replacement and structural repair at Baraga Armory Baraga Construction Project - Army Guard Title IV Parking lot construction at Baraga Armory Charlotte Construction Project - Army Guard Title IV Interior Renovations at Charolotte Armory Grand Ledge Construction Project - Army Guard Title IV Parking lot construction at Grand Ledge Armory Grand Ledge Construction Project- Army Guard Title IV Construction of Cold Storage building at Grand Ledge Armory Kingsford Construction Project - Army Guard Kitchen, restroom, and fitness room reconstruction and cold storage building Title IV construction at Kingsford Armory Kingsford Energy Project - Army Guard Title IV Roof replacement at Kingsford Armory RFSC Construction Project - Army Guard Title IV Reconstruct parking lot at Lansing Reserve Forces Support Center

3/1/2009

N/A

$

450,000

DMVA

Lansing

RFSC Energy Project - Army Guard Title IV

3/1/2009

N/A

$

450,000

DMVA

Lansing

N/A

$

150,000

DMVA

Lansing

N/A

$

450,000

DMVA

Taylor

N/A

$

250,000

DMVA

Bay City

N/A

$

150,000

DMVA

Big Rapids

N/A

$

150,000

DMVA

Charlotte

N/A

$

850,000

DMVA

Dowagiac

N/A

$

200,000

DMVA

Detroit

N/A

$

6,000,000

DMVA

Statewide

N/A

$

2,000,000

DMVA

Flint

N/A

$

1,500,000

DMVA

Wyoming

RFSC Energy Project - Army Guard Title IV Replace roof at Lansing Reserve Forces Support Center 7/1/2009 USPFO Warehouse Energy Project - Army Guard Title IV Roof replacement and construction of HAZMAT building at USPFO Warehouse 7/1/2009 Taylor Construction Project - Army Guard Title IV Cold storage building construction at Taylor Armory 3/1/2009 Bay City Construction Project - Army Guard Title IV Foundation repair at Bay City Armory 7/1/2009 Big Rapids Energy Project - Army Guard Title IV Roof Replacement at Big Rapids Armory 7/1/2009 Charlotte Energy Project - Army Guard Title Roof Repair, Cold storage building contruction, kitchen upgrade, mechanical and IV electrical upgrades at Charlotte Armory 7/1/2009 Dowagiac energy Project - Army Guard Title IV Roof Replacement at Dowagiac Armory 7/1/2009 Detroit Light Guard Construction Project Mechanical, electrical, supply room renovation; storm sewer replacement and parking Army Guard Title X lot construction at Detroit Light Guard Armory 7/1/2009 Statewide Armory Energy Project - Army Guard Title IV Energy Controls at armories throughout the state 7/1/2009 Contruct equipment storage building, supply room, oms roof, and replace mechanicals and boiler at Flint Armory 7/1/2009 Flint Energy Projects - Army Guard Title IV Grand Valley Contruction Project - Army Guard Title IV Roof replacement at Grand Valley Armory 7/1/2009

N/A

$

600,000

02262009

tt i m

d e t

e u

st

q e R

s

O N

Replace windows at Lansing Reserve Forces Support Center

S

ub

Submitted Requests - Not Approved

Route (Infrastructure Only)

1015 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency DMVA

Greenville

DMVA

Howell

DMVA

Ishpeming

DMVA

Jackson

DMVA

Jackson

DMVA

Kalamazoo

DMVA

Lansing

DMVA

Lansing

DMVA

Lansing

DMVA

Lansing

DMVA

Lapeer

DMVA

Lapeer

DMVA

Manistee

DMVA

Marquette

DMVA

Marquette

DMVA

Midland

DMVA

Midland

DMVA

Montague

DMVA

Port Huron

DMVA

Port Huron

DMVA

Saginaw

DMVA

Sturgis

DMVA

Taylor

DMVA

Ypsilanti

DMVA

Ypsilanti

DMVA

Grayling

DMVA

Battle Creek

02262009

Project Name Greenville Construction Project - Army Guard Title IV Howell Construction Project - Army Guard Title IV Ishpeming Construction Project - Army Guard Title IV Jackson Construction Project - Army Guard Title IV Jackson Construction Project - Army Guard Title IV Kalamazoo Energy Project - Army Guard Title IV Lansing RFSC North Energy Project - Army Guard Title IV Lansing RFSC North Construction Project Army Guard Title IV Lansing RFSC North Construction Project Army Guard Title IV Lansing RFSC Construction Project - Army Guard Title IV Lapeer Energy Project - Army Guard Title IV Lapeer Construction Project - Army Guard Title IV Manistee Construction Project - Army Guard Title IV Marquette Energy Project - Army Guard Title IV Marquette Energy Project - Army Guard Title IV

m b u

S

Project Description Start Date Construct new kitchen, supply rooms, fitness rooms, personal equipment storage and restrooms at Greenville Armory 7/1/2009 Construct new kitchen, supply rooms, fitness rooms, personal equipment storage and restrooms at Howell Armory 7/1/2009

N/A

$

1,000,000

N/A

$

1,000,000

Construct new parking lot at Ishpeming Armory

7/1/2009

N/A

$

500,000

Contruct maintenance bay addition at Jackson Armory

7/1/2009

N/A

$

750,000

Construct cold storage building at Jackson Armory Construct supply rooms, fitness rooms, equipment storage; make mechanical upgrades replace boiler and roof at Kalamazoo Armory

7/1/2009

$

500,000

N/A

$

1,000,000

N/A

$

1,470,000

7/1/2009

N/A

$

80,000

7/1/2009

N/A

$

450,000

7/1/2009

N/A

$

250,000

7/1/2009

N/A

$

150,000

7/1/2009

N/A

$

1,000,000

7/1/2009

N/A

$

300,000

Boiler replacement at Marquette Armory

7/1/2009

N/A

$

200,000

Roof replacement at Marquette Armory

7/1/2009

N/A

$

200,000

7/1/2009

N/A

$

150,000

7/1/2009

N/A

$

200,000

7/1/2009

N/A

$

200,000

7/1/2009

N/A

$

150,000

7/1/2009

N/A

$

150,000

7/1/2009

N/A

$

750,000

7/1/2009

N/A

$

1,000,000

7/1/2009

N/A

$

300,000

7/1/2009

N/A

$

350,000

7/1/2009

N/A

$

300,000

7/1/2009

N/A

$

20,000,000

7/1/2009

N/A

$

7,200,000

7/1/2009

A T

Exterior brick tuck point at Lansing RFSC North Renovate elevator and replace roof at Lansing RFSC North Contruct cold storage building at Lansing RFSC

O N

Replace roof at Lapeer Armory Kitchen, restroom, and fitness room reconstruction and cold storage building construction at Lapeer Armory

st

s

Parking lot construction at Manistee Armory

e u

eq

R d

e t t

Submitted Requests - Not Approved

O R

PP

Electrical upgrades, HVAC replacement and interior upgrades at Lansing RFSC North 7/1/2009

Midland Energy Project - Army Guard Title IV Boiler replacement at Midland Armory Midland Construction Project - Army Guard Title IV Parking lot replacement at Midland Armory Montague Construction Project - Army Guard Title IV Roof replacement at Montague Armory Port Huron Energy Project - Army Guard Title IV Boiler replacement at Port Huron Armory Port Huron Energy Project - Army Guard Title IV Roof replacement at Port Huron Armory Saginaw Construction Project - Army Guard Supply rooms, HVAC improvements, restrooms, kitchen improvements and controls Title IV at Saginaw Armory Sturgis Construction Project - Army Guard Kitchen, supply rooms, fitness rooms, equipment storage, restrooms at Sturgis Title IV Armory Taylor Construction Project - Army Guard Title IV Parking lot contruction at Taylor Armory Washtenaw Energy Project - Army Guard Title IV Roof replacement and structural repair at Washtenaw Armory Washtenaw Construciton Project - Army Guard Title IV Parking lot construction at Washtenaw Armory Camp Grayling Construction Project - Army Guard Title X Construct Barracks #2 at Camp Grayling Ft. Custer OMS Construction Project - Army Guard Title X Construct Operational Maintenance Shop at Ft. Custer

it

Expected Completion Date

N/A

Funding Request

D VE

Route (Infrastructure Only)

1016 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency DMVA

Grand Ledge

DMVA

Battle Creek

DMVA

Battle Creek ANG

DMVA

Alpena

Project Name Grand Ledge AASF Hanger Construction Army Guard Title X Ft. Custer Infrasructure Construction Project Army Guard Title X Battle Creek ANG Construction Project - Air Guard Title X Alpena ANG Construction Project - Air Guard Title X

Project Description

Start Date

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Repair Base Roads at Alpena ANG

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Add/alter POL operations facility (Bldg 700) at Alpena ANG

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Repair/Maintain Runway 1/19 at Alpena ANG

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Maintain runway aprons at at Alpena ANG

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Replace classrooms at Alpena ANG

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Replace CE storage at Alpena ANG

DMVA

Alpena

DMVA

Expected Completion Date

Funding Request

Construct new hanger at Grand Ledge Army Aviation Support Facility

7/1/2009

N/A

$

4,000,000

Construction of prime power needs and repair and replacement of water and sewer

3/1/2009

N/A

$

750,000

$

2,100,000

$

8,500,000

$

730,000

$

620,000

$

840,000

$

400,000

$

700,000

$

720,000

Alpena ANG O&M Project - Air Guard Title IV Construct addition to MOUT training aid at Alpena ANG

$

700,000

Alpena

Alpena ANG O&M Project - Air Guard Title IV Construct convoy trainer facility at Alpena ANG

$

700,000

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Construct MRE storage facility at Alpena ANG

$

350,000

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Repair troop quarters roofs at Alpena ANG

$

650,000

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Upgrade HVAC controls - Phase 1 at Alpena ANG

$

290,000

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Upgrade HVAC controls - Phase 2 at Alpena ANG

$

290,000

DMVA

Alpena

Alpena ANG O&M Project - Air Guard Title IV Upgrade HVAC controls - Phase 3 at Alpena ANG

$

290,000

DMVA

Alpena

Repair Medical clinic - building 118 at Alpena ANG

$

250,000

DMVA

Selfridge ANG

Demolish excess facilities

$

4,300,000

DMVA

Selfridge ANG

Repair/Alter Main Gate

$

2,246,000

DMVA

Selfridge ANG

Repair/Alter Alternate Gate

$

2,275,000

DMVA

Selfridge ANG

Repair/Alter Fire Station

$

1,000,000

DMVA

Battle Creek ANG

Repair electrical distribution system

$

1,700,000

DMVA

Battle Creek ANG

Alpena ANG O&M Project - Air Guard Title IV Selfridge ANG Construction Project - Air Guard Title X Selfridge ANG Construction Project - Air Guard Title X Selfridge ANG Construction Project - Air Guard Title X Selfridge ANG Construction Project - Air Guard Title X Battle Creek ANG Construction Project - Air Guard Title X Battle Creek ANG Construction Project - Air Guard Title X

Repair roads basewide

$

1,400,000

DMVA DMVA DMVA DMVA DMVA DMVA

Marquette Marquette Marquette Marquette Marquette Grand Rapids

$ $ $ $ $ $

20,000 50,000 35,000 228,000 225,000 781,000

eq

m b u

s

st

O R

A T

PP

O N

R d

e t t

it

Yes

Replace Troop Quarters - Phase I at Alpena ANG

e u

S

02262009

Repair communications facility, building 6900

D.J. Jacobetti Energy and Remodeling Project Kitchen equipment replacement at D.J. Jacobetti Home for Veterans D.J. Jacobetti Security Project Security camera system at D.J. Jacobetti Home for Veterans D.J. Jacobetti IT Project IT infrastructure updates at D.J. Jacobetti Home for Veterans D. J. Jacobetti Energy Project Repair and retube boilers at D.J. Jacobetti Home for Veterans D.J. Jacobetti Renovation Project Nursing unit renovations at D.J. Jacobetti Home for Veterans Grand Rapids Home Fire Safety Project McLeish Building sprinkling project at Grand Rapids Home for Veterans

Submitted Requests - Not Approved

3/1/2009 3/1/2009 3/1/2009 3/1/2009 7/1/2009 3/1/2009

D VE

Route (Infrastructure Only)

1017 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township DMVA Grand Rapids

Project Name Grand Rapids Home Energy Project

Project Description Replace windows in McLeish Building at Grand Rapids Home for Veterans

Start Date 7/1/2009

DMVA

Grand Rapids

Grand Rapids Home Remodeling Project

Room remodeling project in McLeish Buildingat Grand Rapids Home for Veterans

7/1/2009

DMVA DMVA DMVA DMVA DMVA DMVA

Grand Rapids Grand Rapids Grand Rapids Grand Rapids Grand Rapids Grand Rapids

Grand Rapids Home Remodeling Project Grand Rapids Home Contruction Project Grand Rapids Home Contruction Project Grand Rapids Home Energy Project Grand Rapids Home Paving Project Grand Rapids Home Contruction Project

Room remodeling project in Rankin Building at Grand Rapids Home for Veterans Construction of all purpose room at Grand Rapids Home for Veterans Replace nurse call system at Grand Rapids Home for Veterans Replace roof on Rankin Building at Grand Rapids Home for Veterans Road Paving project at Grand Rapids Home for Veterans Linen service area expansion project at Grand Rapids Home for Veterans

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

MDOC

Munising, Baraga, Marquette, Muskegon, Coldwater, Painsedale, Kinchloe, Manistee, Marenisco,Lapeer, Flint, Saginaw, Jackson, Escanaba, Grand Rapids, Traverse City and Lansing area State owned buildings Wind Turbine Technology

Install wind turbines and related equipment to multiple State of Michigan owned facilities. Electrical power generated by the turbine will be primary, if additional electricity is required it will be supplemented by the local electrical supplier. This will allow large consumption facilities the ability to lower their demand loads from the electrical grid. 6/9/2009

Ypsilanti

Renovation of existing dormitory and dining services areas throughout campus. Replace aging and inefficient building envelope systems such as window,door and roof systems. Installation of new highly energy efficient building systems and equipment, including heating and ventilation systems and associated controls, light fixtures and water fixtures. Potential energy savings are significant and initial assessment by Chevron engineers is complete.

Easterm Michigan University

Expected Completion Date $

Funding Request 740,500

$

1,216,852

D VE

Route (Infrastructure Only)

$ $ $ $ $ $

622,700 627,000 674,000 136,000 23,000 357,500

$

20,000,000

2/1/2010

$

33,960,000 n/a

Addition to the Science Complex to house Interdisciplinary Natural Science Laboratories, Classrooms, and Faculty offices. This facility is to be used for the introduction of our students to a diverse array of techniques and technologies currently used by researchers, and to provide opportunities for students to pursue independent research projects. Project includes installation of new state-of-the-art HVAC and controls, plumbing and electrical systems for energy efficient operation of natural sciences research and teaching laboratories. Installation of a "green roof" system on the second floor. All design to meet LEEDS Silver certification. Best Management Practices will be used in accordance with the Michigan Department of Enviromental Quality. 12/22/2008

9/10/2010

$

46,250,000 n/a

Science Complex - Mark Jefferson Renovation (Phase 1B)

Renovation and Modernization of an outdated and inefficient natural sciences facility, to promote collaboration of the primary natural sciences of Biology, Chemistry and Psychology. This renovation will enhance the University's ability to compete for NIH and NSF funding to conduct biomedical research. Project includes the installation of state-of-the-art HVAC and controls, plumbing and electrical systems to reduce existing operating costs. All design to meet LEED Silver Criteria and in compliance with the Americans with Disabilities Act. 9/10/2010

11/26/2011

$

43,750,000 n/a

Science Complex - Strong Hall Renovation (Phase 2)

Renovation and Modernization of outdated facility, including replacing existing HVAC, plumbing and electical systems to improving energy efficiency and reduce existing operating costs. Providing educational and research facilities for Geology and Geography and the Physics and Astronomy departments, which will complete Eastern Michigan University's Science Complex project. All design to meet LEED Silver pending funding Criteria and in compliance with the Americans with Disabilities Act. approval

Start + 16 months

$

38,000,000 n/a

T O

N s

t s e

EMU Energy Savings Project

O R

P P A 2/2/2009

u q e

Easterm Michigan University

Easterm Michigan University

Easterm Michigan University

Ypsilanti

Ypsilanti

Ypsilanti

02262009

R d

e t tt

Science Complex Addition (Phase 1A)

i m

b u S

Submitted Requests - Not Approved

1018 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Ferris State University Big Rapids, MI

Ferris State University Big Rapids, MI

Ferris State University Big Rapids, MI

Ferris State University Big Rapids, MI

Ferris State University Big Rapids, MI

Ferris State University Big Rapids, MI

Project Name

Ferris State University Big Rapids, MI

02262009

Start Date

Geothermal Heating, Ventilation, Air Conditioning for Arts & Sciences Complex

Replace hvac systems in 4-building arts & sciences complex at FSU with central system. Over 50% of FSU classes in Big Rapids are taught in these buildings where the systems continually fail and are energy inefficient. This will be the first large-scale geothermal application at University, and constitute an on-site laboratory for the Alternative Energy Institute we are building. Coupled with strong university programs in construction management, facilities management, and heating, ventilation, air conditioning this will be an important step in creating a new generation of industry leaders in alternative energy building systems. 4/1/2009

Student Dining Facility Renovation

Renovation of the 1960's vintage South Commons dining center building. The new LEED certified dining center will be converted from a traditional cafeteria into a marche' (food court) concept. The facility serves proximally 48% of the on campus student population.

South Campus Utility Infrastructure

Replacement of 50 year old utility infrastructure that includes: 7200 volt primary electrical, high pressure steam and condensate, water mains, sanitary sewer and storm sewer.

3/1/2009

Cramer Hall Fire Suppression

Cramer Hall is an eleven story residence hall that was constructed in 1969. The facility has been well maintained and is very popular amoung students as a place to live. The building does not have a fire suppression system (sprinklers) which places the occupants at greater risk in case of a fire. The City of Big Rapids provides fire response and has the only ladder truck in a 50 mile radius capable of evacuating persons in the upper floors of the building. The city's ladder truck is old and becoming unreliable and they are attempting to fund a replacement. Installation of an appropriate fire suppression system in this building would greatly reduce the potential of injury to over 100 students in the event of a fire. 5/1/2009

Jim Crow Museum

Construction of a new museum space within the lower level of the Arts & Science Commons building to relocate the Jim Crow museum or racist memorabilia. The mission of the museum is to promote racial tolerance by helping people understand the historical and contemporary expressions of intolerance. http://www.ferris.edu/htmls/news/jimcrow/index.htm

A T

e u

st

eq

s

O R

PP

3/1/2009

8/1/2009

Funding Request

Route (Infrastructure Only)

D VE $

16,000,000

$

7,300,000

8/1/2009

$

South of Campus Drive & West of 3,000,000 Knollview Drive

8/1/2009

$

1,500,000

5/1/2010

$

2,500,000

8/1/2009

O N

5/1/2009

R d

Replacement of 50 year old campus primary 7200 volt electrical infrastructure. The infrastructure is becoming increasing unreliable. Failures of the system cause disruption to significant portions of the campus and effect the ability to house and feed students as well as shut down classrooms and offices. Repair parts are often not readily available. 5/1/2009

8/1/2010

$

West Loop along Bus 131, East Loop 6,000,000 along Ives Ave.

FSU Pharmacy in MSU Secchia Building

Build-out 7th floor of MSU LEED Certified Secchia Center building to locate final year of FSU Pharmacy program classes. Ferris graduates more than 50% of the pharmacists in Michigan each year. This will connect Ferris pharmacy efforts with the dveelopment of the "medical mile" in Grand Rapids. There is a need for additional graduates in this field and every graduate finds employment in positions which start $110,000 a year. 3/1/2009

8/1/2010

$

4,200,000

New Student Housing

Demolition of 1960's vintage buildings that are very inefficient, high energy consuming facilities and construction of a new approximatly 340 bed apartment complex. Project will be LEED certified and may incorporate geothermal mechanical systems for heating and cooling. 5/1/2009

8/1/2010

$

20,000,000

Primary Voltage Electrical Infrastructure Replacement

e t tt

i m

b u S

Ferris State University Grand Rapids, MI

Project Description

Expected Completion Date

Submitted Requests - Not Approved

1019 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Ferris State University Grand Rapids, MI

GCC

GCC

Ironwood, MI

Ironwood, MI

Project Name

Project Description

Start Date

Expected Completion Date

Federal Building

Repurpose Federal Court House and Post Office constructed in 1909 for Kendall College of Art and Design. This building is currently vacant and is a drain on the budget for the City of Grand Rapids. Project will be LEED certified and is hoped to incorporate geothermal mechanical systems for heating and cooling. The intent for the upper floors of this building is to create a Center for the Built Environment which will build upon the leadership position of west Michigan in creating LEED certified buildings. This will be combined with a new Masters of Architecture degree at KCAD and help Grand Rapids transition from a manufacturing center to a design center. 5/1/2009

Equine Facility renovation

Renovation of Equine Facility to house new Equine studies program. Including windpower, ground source heat pump heating, solar preheat, energy efficency building envelope. 6/1/2009

Building reclading

Installing an aluminum cladding system on the aformentioned buildings. This would be installed over the failed EFIS exterior finish. This would increase energy efficiency and prevent water from entering the building through the failed exterior EFIS system. 6/1/2009

Classroom Renovations and Technology Upgrades

P P A

O R 9/1/2010

Funding Request

Route (Infrastructure Only)

D VE

30,000,000

$

900,000 Equine Facility

12/1/2009

$

Solin Center/Lindquist 1,090,000 Center

Built in 1967, the college's main classroom building with five wings as its layout is inflexible in purpose and is creating increasing challenges to space utilization as enrollment continues to increase. Classrooms are too small, with most not able to accommodate more than 25 students and lacking multimedia support for teaching. Teaching labs are also dated and not located appropriately within program or discipline. This renovation project will utilize existing space to increase classroom size, flexibility and technology by relocating and centralizing faculty offices that are currently adjacent to most classrooms and thus preventing their expansion. The college's ability to serve more students and the community will be enhanced, as will space utilization and faculty / student interaction. Cost efficiencies will be created, including consolidation and reduction in number of office equipment items and the ability to increase course section size. The project will follow U.S. Building Council LEED Standards and include energy efficieny improvements in areas such as lighting, HVAC and windows. March, 2009

August, 2010

$

6,000,000

Built in 1967 in the E Wing within the college's main classroom building, the GOCC library is outdated in appearance, functionality and technology infrastructure. This renovation project will improve the college's ability to meet the rapidly changing information services of the current and next generations of students by providing better access to library materials in electronic formats and better organization of learning space and aesthetics. The project will follow U.S. Building Council LEED Standards and include energy efficieny improvements in areas such as lighting, HVAC and windows. May, 2009

August, 2010

$

1,500,000

Built in 1967 in the D Wing within the college's main classroom building, the Nora Hagen Theater is currently a sloped floor 200+ seat venue used mostly for lecture and instruction-related musical performances. The space is woefully underutilized due to several limitations. This project will include transforming the space to a 120-150 seat black box theater model that will better serve the educational and community needs as a smaller, flat-floor multimedia lecture hall capable of being changed quickly based on the nature of its use. Space utilization will be greatly improved and revenue generating activities are expected to provide some return on investment. The project will follow U.S. Building Council LEED Standards and include energy efficieny May, 2009 Nora Hagen Instructional Theater Renovations improvements in areas such as lighting, HVAC and windows.

August, 2010

$

1,900,000

T O

9/1/2009

$

N s

Glen Oaks Community Sherman Township, College Centreville, MI

Glen Oaks Community Sherman Township, College Centreville, MI

u S Glen Oaks Community Sherman Township, College Centreville, MI

02262009

it

d e tt

Library Renovations

bm

t s e

qu

e R

Submitted Requests - Not Approved

1020 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Glen Oaks Community Sherman Township, College Centreville, MI

Glen Oaks Community Sherman Township, College Centreville, MI Gogebic Community College Ironwood, MI

Grand Valley State University

Allendale, Michigan; Allendale Township

Project Name

Welcome and Student Services Center

Study and Student Interaction Spaces

The college currently lacks effective studying and student/ faculty interaction spaces, which have been indicated as a fundamental campus need to engage students and enhance learning effectiveness. The existing large concourse is dark, outdated and underutilized but offers much opportunity for renovations that will provide areas for individual and group meetings with varied seating options, access to internet and food service. Additional entry zones to each of five classroom wings would utilize part of the circulation space for easily identifiable meeting spaces. The project will include materials that promote sustainability and improve energy efficiency.The project will follow U.S. Building Council LEED Standards and include energy efficieny improvements in areas such as lighting, HVAC and windows. May, 2009

Window Replacement

Replace original aluminumn windows with high efficeny clad window systems.

Learning and Information Commons

02262009

1,700,000

August, 2010

$

3,700,000

7/31/2009

$

The Learning and Information Commons, on GVSU's Allendale campus, will become the hub of the university's support for its research work in health sciences, water resources, environmental protection, alternative energy, and job creation for the knowledge economy of the 21st century. The additional instructional capacity will allow measured increases in enrollment, giving more Michigan citizens access to higher education. The project design will ensure energy and operational efficiencies. 3/1/2009

8/1/2012

$

70,000,000

This project will renovate and transform vacated space in Cook Hall, an existing 133,000 sq. ft. building built in 1971, into our Health Education Building. Approximately 30,000 sq. ft. of vacated space will be renovated and merged into new space for our existing health programs in nursing, dental, radiological technology and occupational therapy. Also, we will expand and modernize occupied classrooms and laboratories, and add new technology and lighting. Because of GRCC's committment to sustainability, this renovation and reuse will eliminate the need to build a new classroom building on campus. Approximately 106,000 sq. ft. of this building will be completely renovated. GRCC's close proximitiy to the emerging medical mile, including Van Andel Institute, MSU Med School and Spectrum Hospital, makes this project high priority for GRCC to meet the employment needs of our area. 5/1/2009

Health & Education Facility

8/31/2010

$

7,980,000

q e R

N s

st

Submitted Requests - Not Approved

P P A 5/19/2009

Route (Infrastructure Only)

D VE $

e u

d e t

O R

Funding Request

August, 2010

T O

b u S

Grand Rapids

Start Date

Students entering through the main entrance of GOCC's campus are immediately presented with a blank wall and a long, narrow corridor creating a negative first impression that is viewed as a deterrence to recruitment efforts. This project will reorganize existing space in the A Wing within the college's main classroom building to create a Welcome and Student Services Center and improve access to the Bookstore. In addition to greatly improving customer service, this one-stop environment with more self-service information and technology will increase efficiency and control costs. Any resulting bookstore sales increases would provide some return on investment.The project will follow U.S. Building Council LEED Standards and include energy efficieny improvements in areas such as lighting, HVAC and windows. May, 2009

tt i m

GRCC

Project Description

Expected Completion Date

500,000 Academic Building

1021 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

GRCC

GRCC

GVSU

Grand Rapids

Grand Rapids

Grand Rapids, Michigan

GVSU Grand Rapids, Michigan Henry Ford Community College Dearborn, MI Henry Ford Community College Dearborn, MI Henry Ford Community College Dearborn, MI Jackson Community College Jackson/Summit Jackson Community College Jackson/Summit Jackson Community College Jackson/Summit Jackson Community College Jackson/Summit

Project Name

Project Description

Start Date

Main Building Renovation

The Main Building is a 210,000 sq. ft. building built in 1924 that houses 48 classrooms and student services offices such as Admissions, Enrollment Center, Financial Aid, Cashiers and Academic Administration. This building has an inefficient HVAC system and needs at least 3 new mechanical rooms on the upper floors. All the classrooms need updated technology and renovations to bring them up to today's learning environment standards. Because of GRCC's committment to sustainability, this renovation and reuse will eliminate the need to build a new classroom building on campus. Our renovation will require green products and we will work to achieve some level of LEED status. 5/1/2009

Ford Health & Wellness

GRCC's Ford Fieldhouse, built in 1976, houses our Wellness Academic Department, Community Health Facility and our athletic programs. Because of our proximity to Spectrum Hospital, Van Andel Research Institute and MSU Medical School and our growing demand to collaborate with them on health and medical initiatives, it is imperative that we expand the existing facility. An addition of 40,000 sq. ft. would add classrooms and labs such as a Human Performance Lab. The changing nature of wellness requires the upgrade of our cardio training facilities used by our students, staff, athletes and the community. We also need to renovate approximately 75,000 sq. ft. of this aging building. Our Fieldhouse is used constantly by community groups and is our primary large group meeting room for College meetings, including graduation cermonies. 9/1/2009

Renovation of the Technology and Entrepreneurial Studies Building

Renovate existing building to meet LEED NC standard; renovation will support & enhance science, technology, health professions, and entrepreneurial studies. Projec will allow additional enrollment, expand access for new students, and support job creation activities. 3/1/2009

T O

Energy Efficiency Upgrade to Steam System at DeVos Center Building School of Nursing Renovation

s t s

R d

D VE $

10,500,000

8/31/2010

$

11,600,000

8/1/2010

$

11,000,000

3/1/2009

8/1/2010

$

1,500,000

April 2009

December 2009

$

3,000,000

December 2009

$

2,500,000

December 2009

$

15,000,000

-N

e u

O R 8/31/2010

Funding Request

Student Services Center Renovation Storm Water Improvement/ Green Parking Project

Renovate Student Services Center to meet growing demand for services by creating a Welcome Center, a Distance Learning Center and a Business Incubator Center April 2009 Improve stormwater runoff, reduce impact, create alternative energy technologies laboratory in a green parking structure April 2009

Infrastructure improvements

HVAC replacement, parking lot replacements, road access, elevators, etc.

09.01.09

10.01.10

$

17,000,000

Rennovation of existing facility and construction of new laboratory bldg.

03.01.09

12.01.10

$

21,900,000

Walker Hall renovation

Rennovation of exisiting facility, classroom improvements, and expansion

11.01.09

12.30.10

$

6,000,000

Potter Center renovation

Rennovation of exisiting faciltiy, classroom and theater spaces

06.01.10

12.30.11

$

8,000,000

i m

e t tt

Whiting Hall and Health Laboratory Center

ub

Route (Infrastructure Only)

P P A

Remove connection to local steam system (local system does not have condensate return therefore significant amounts of heat is wasted to the public sewer system), install new ultra-high efficiency modular boilers and re-commission the steam to hot water system Renovate School of Nursing to expand Nursing program, expand Certified Nursing Assistant program and add public low cost clinic

eq

Expected Completion Date

S 02262009

Submitted Requests - Not Approved

1022 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kalamazoo Valley Community College

Texas Township, MI

Project Name

Project Description

Start Date

The project consists of five distinct elements at the main campus of Kalamazoo Valley Community College. The first project is the Student Success Center, which entails approximately 18,000 square feet of new construction and 10,000 square feet of renovation. The Student Success Center provides guidance, academic support, and a network for the college to remove barriers to education for students. The Student Success Center draws on numerous departments within the college to provide an allencompassing support system, and has achieved a high degree of success during its first phase implementation. This project will seek LEED Silver certification. The second project consists of a 7,000-square-foot expansion of faculty offices and KVCC Student Success Center/Faculty Office support spaces, which have not been enlarged since the college began. The third area of work entails the renovation of 13,000 square feet of space vacated by Addition/Lab Space Expansion/Central functions moving to the Student Success Center, allowing for the creation of new Receiving/Renovation and Parking Lot science lab space and classrooms to serve a demand identified in the Master Plan Addition Room Utilization Study. The approximately 13,000-square-foot renovation of the cent 7/1/2009

Battle Creek

Front Entrance Plaza Steps

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

11/1/2010

$

The main front step entrance to the campus was built in the 1960’s and serves as a high volume of foot traffic for students and the community. After a number of rebuilds, the front steps again are showing breakage on the step noses and are in need of replacement. Currently, there is no ADA access to the front of campus. An ADA ramp is needed at the College’s exterior main front entrance for wheelchair, stroller and cart accessibility. The circle driveway at the main front step entrance to the campus has no vehicle pull off lane for pick up and drop off of students, campus visitors, and school buses which results in the circle drive becoming congested and completely blocked and impassable at times. A drop off and pick up lane is needed to ensure the safe arrival and departure of campus visitors. The estimated cost of the project is $781,064. This project was not included in the 5 year plan as their has been ADA Ramp & some interest by a local foundation to assist in design and particial funding of this porject. Todate the College has not recieved a funding committement. 5/18/2009

8/28/2009

$

N/A College 781,064 Campus

The C Classroom Building is a renovation project that is part of Kellogg Community College's 21st Century initiative. This initiative is a component of the College's 15 year master plan that includes the renovation of existing facilities and also the construction of new buildings at the College's main campus in Battle Creek, Michigan, The 21st Century initiative is in its 10th year of a 15-year master plan. This project has been a capital outlay priority since 2005. The 31,633 square ft. C Classroom Building, constructed in 1965, serves as a general classroom building and home of business, math, English and social science classes. The building contains ten classrooms and three faculty office suites on four levels. Although the bricks and mortar are holding up well, the C Classroom Building is in need of major improvements including replacement of the mechanical, electrical and plumbing systems as well as, architectural and security improvements. Some of the general classrooms in the building need to be enlarged to accommodate larger class enrollments. Upgraded teaching technology is needed. Departmental faculty and staf3/18/2009

1/11/2010

$

N/A College 5,000,000 Campus

T O

Kellogg Community College

Expected Completion Date

N s

t s e

u q e

12,000,000

R d

Kellogg Community College

02262009

i m

b u S

Battle Creek

e t tt

C Classroom Building

Submitted Requests - Not Approved

1023 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Kellogg Community College

Battle Creek

Project Name

Project Description

Start Date

Lane Thomas Renovation

The 29,756 square ft. Lane-Thomas Building, constructed in 1961, serves as the site for the testing center, EMS office, shipping and receiving, mail room, duplication center, facilities and campus safety offices, Siena Heights offices and eight general purpose classrooms on three levels. At the time of the 1997 Facilities Study, the bricks and mortar were holding up well, but now are in question. Therefore, a study of the building’s exterior will be done to access moisture leaks and material degradation. Major improvements will include roofing replacement, exterior brick/stone cleaning, enhanced indoor air quality, fan coil unit replacement, a four pipe system, heating and chilled water system and upgrades on lighting, electrical, fire alarm/clock system, plumbing, ADA restrooms, sprinkling system, security, glass, signage, doors, flooring, walls, ceilings, and furniture. Major program moves are proposed for this building which will require gutting the entire building and renovating based upon the College’s needs. General classrooms in the building will be enlarged, and adult size furniture w 7/31/2009

P P A

$

50,000

7/1/2009

$

200,000

3/1/2009 3/1/2009

8/1/2009 8/1/2009

$ $

510,000 350,000

3/1/2009

8/1/2009

$

500,000

3/1/2009

8/1/2009

$

450,000

3/1/2009

8/1/2009

$

270,000

8/1/2009

$

620,000

9/1/2009 10/1/2009

$ $

490,000 1,000,000

11/1/2009 3/1/2010

$ $

780,000 500,000

8/1/2010 9/1/2010

$ $

569,000 705,000

11/1/2010

$

4,420,000

11/1/2010

$

4,300,000

10/1/2011

$

13,865,000

Library Data Room HVAC

Kirtland

Roscommon MI

Maintenance HVAC

Replace existing window air conditioning units with an energy efficient central system. 3/1/2009

Kirtland Kirtland

Roscommon MI Roscommon MI

Instructional Building HVAC Upgrade Door/window replacement

Kirtland

Roscommon MI

Administration Boiler Replacement

Kirtland

Roscommon MI

Administration HVAC

Upgrade HVAC control systems and add air conditioning to instructional areas. Replace exterior doors and windows in 6 primary buildings Replace 30 year old boiler and stack with energy efficient system - potential for geothermal system being studied. Replace two pipe distribution system with four pipe system to increase efficiency and improve control. Replace existing chiller.

Kirtland

Roscommon MI

Administration Ventilation

Remodel duct system on upper level. As building configuration changes have been made duct system and controls have not been changed to balance airflow.

Kirtland

Roscommon MI

Alternative Energy Program Facility

Kirtland Kirtland

Roscommon MI Roscommon MI

Network/Phone System Upgrade Water Well System

Kirtland Kirtland

Roscommon MI Roscommon MI

Waste Water Treatment Facility Upgrade Art Department Rennovation

d e tt

t i m

q e R

N s

st

Addition of facilities and equipment to support programming in alternative energy equipment installation and maintenance. Specifically including classroom equipment and installation of a 50 KW wind turbine and photovoltaic solar array. 4/1/2009 Replacement of existing 10/100mbps network and Nortel PBX phone sytem to accomidate VoIP phone system. 3/1/2009 Upgrade campus water well system to a type 1 community water system 31/2009 Install a new sand filter for existing treatment system. Upgrades will extend useful life and add capacity. 4/1/2009 Relocate and expand computer graphic lab space 6/1/2009

Kirtland Kirtland

WestBranch MI Roscommon MI

Medical Arts Extension Site Child Care Center

Kirtland

Roscommon MI

Medical Arts Wing - Simulation Center

Kirtland

Roscommon MI

Student Housing

New construction - 2800 sq. ft. building located in southern portion of Kirtland's district. Building would include two general purpose/lecture classrooms, two medical sciences labs, and office space to support approximately 60 students concurrently. 8/1/2009 New construction of a 4,100 sq. ft. child care facility on campus grounds 7/1/2009 17,000 sq. ft. addition to the existing Instructional building housing state of the art medical simulation labs and large lecture classrooms. 7/1/2009 New construction of a 30,000 sq. ft. (80-100 bed) facility providing on campus resident housing. 7/1/2009

Kirtland Center

Addition/construction 40,000 sq. ft. Student Center including renovation of the existing building and addition of two 20,000 sq. ft. wings. Facility would consolidate functions including admissions, registration, financial aid, advising/counseling and auxiliary services. 8/1/2009

Kirtland

b u S

Roscommon MI

02262009

Submitted Requests - Not Approved

N/A College 5,500,000 Campus

6/1/2009

Roscommon MI

Route (Infrastructure Only)

D VE $

Kirtland

T O

O R

Funding Request

4/30/2010

Separate existing data room HVAC from remaining building systems. Due to isolated heat loads in the data room temperatures in surrounding areas must be kept unreasonably low to compensate. 3/1/2009

e u

Expected Completion Date

1024 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Kirtland

Grayling MI

Grayling Extension Educational Building

Kirtland CC

Roscommon MI

Energy efficient lighting

Project Description

Expected Completion Date

Start Date

New Construction 12,000 sq. ft. building located in northern portion of Kirtland's district. Building would include general purpose/lecture classrooms, two sciences labs, and office space. Install energy efficient T-5 fixtures and occupancy sensors for all interior spaces. Install energy efficient exterior lighting and timers.

8/1/2009

10/1/2011

3/1/2009

7/1/2009

Funding Request

$

2,500,000

D VE $

400,000

$

2,701,350

8/15/2009

$

1,739,264

Napier Academic: Science Facility Lake Michigan College Benton Charter Township Enhancement

Revamp science facilities not renovated since 1971, creating enhanced bio-medical, health science and science labs elevated to current teaching and curriculum standards, and establishing an inquiry-based environment. Labs will support new energy production and alternative energy instructional programs for high skill, high wage jobs. 5/4/2009

Napier Academic: Energy Saving Roof Lake Michigan College Benton Charter Township Replacement

Replace existing roofing system with a new white membrane roof and increased insulation to meet the energy performance criteria required for LEED certification for the Napier Avenue Academic Building.

5/4/2009

Napier Academic: Energy Saving Boiler and Lake Michigan College Benton Charter Township Chiller Replacement

Replace chiller and two boilers in the Napier Avenue Academic Building and associated building controls to meet the energy performance criteria required for LEED certification.

5/4/2009

8/16/2009

$

2,227,315

5/4/2009

8/17/2009

$

2,900,904

Napier Academic: Energy Efficient Window Lake Michigan College Benton Charter Township Installation Napier Academic: Structural Brick Cladding Lake Michigan College Benton Charter Township Repair

Replace all original windows and glass entries in L-Wing, Second Floor C-Wing, Second Floor B-Wing, and the Third Floor, North Side of the Napier Avenue Building, along with original skylights, with new energy efficient framing with insulated glass to meet the energy performance criteria required for LEED certification. 5/4/2009

8/18/2009

$

2,705,315

Repair brick facing on east and west side of central plaza and north C-Wing overhang.5/4/2009

8/19/2009

$

219,926

Napier Academic: High Water Efficiency and Lake Michigan College Benton Charter Township ADA Compliant Plumbing Fixture Installation

Replace current fixtures with low flow plumbing fixtures to increase water efficiency and remodel toilet rooms to comply with Michigan Building Code Accessibility requirements in accordance with the Americans with Disabilities Act (ADA) Napier Avenue Academic Building.

5/4/2009

8/20/2009

$

1,352,400

Improvements to comply with Michigan Building Code Accessibility requirements in accordance with the Americans with Disabilities Act (ADA), and to improve campus safety and security. Original door handles, elevator controls, handrails, guardrails, and interior building signage are not compliant with current code. The campus also Lake Michigan College Benton Charter Township Napier Academic: Accessibility Improvements does not have a public address system.

5/4/2009

8/21/2009

$

1,160,120

Renovate a recently donated building into an Educational and Research Center for fis health and disease, water quality and to house the University-run fish hatchery. 3/1/2009

2/18/2010

$

9,000,000

8/31/2010

$

6,000,000

7/29/2011

$

20,000,000

January, 2010

$

T O

P P A

Improve campus security, safety and energy efficiency by installing solar powered Napier Avenue Campus: Parking Lot Repave LED lighting to the Napier Avenue Campus Entrance Boulevard and repaving the Lake Michigan College Benton Charter Township and Energy Saving Site Lighting Upgrade existing entry drives and the Mendel Center North Parking Lot.

Lake Superior State University Lake Superior State University Lake Superior State University

Lansing Community College

Sault Sainte Marie

Sault Sainte Marie

u S

Sault Sainte Marie

Lansing, Michigan

02262009

itt

d e t

Aquatic Research Laboratory & Educational Center Renovation

N s

st

e u

q e R

O R

Includes asbestos abatement, student housing fire suppression, window Physical Plant Energy Cost Containment and replacements, HVAC replacement, solar water heating and other energy efficiency Rehabilitation Projects. improvements. Includes rehab of historic buildings. 5/4/2009 School of Business, Economics and Legal Replacement facility to house University's School of Business, Entrepreneurial & Lega Studies 8/3/2009 Study

bm

Renovation of former Photography Center to include new early childhood education center with state-of-the-art thermally efficient window and door systems, and Energy Star-rated mechanical and electrical systems. Center will provide students access to Creation of Early Childhood Education Center child care while on campus pursuing degrees and certificates or improving job skills. June/July 2009

Submitted Requests - Not Approved

8/14/2009

Route (Infrastructure Only)

1,700,000 N/A

1025 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lansing Community College

Lansing Community College

Project Name

Project Description

Start Date

Campus-wide Building Envelope Project

Replace roofing, window and door systems on Gannon Building, Technology Learning Center, Washington Court Place Building, Continental Building, and Arts & Sciences Building. End-of-life cycle systems to be replaced with new 20- and 40-year systems utilizing more thermally efficient materials. 7/1/2009

Lansing, Michigan and Delta Township

Campus-wide Mechanical & Electrical Infrastructure Project

Replace end-of-life cycle mechanical and electrical systems with new Energy Starrated state-of-the-art green technologies. Mechanical equipment replacement to include HVAC air handling units with variable frequency drives, upgrades to building automation systems, and plumbing system & fixture replacements. Electrical improvements to include providing power factor reduction technologies at West and Downtown Campuses, occupancy sensor technologies, and converting older facilities to new energy efficient lighting systems. Work planned for Arts & Sciences Building, Gannon Building, Health & Human Services Building, and Technology Learning Center. 7/1/2009

Warren

The original buildings on Macomb Community College’s South Campus were built over 40 years ago. Not only are the classrooms no longer able to accommodate the modern learner, the mechanical systems and buildings themselves, while wellmaintained, have exceeded their given life expectancy. Renovation requests for IT and business programming remain on hold due to the high cost of updating the buildings to meet life-safety and ADA compliance regulations. Replacement of the mechanical systems and upgrades to the campus buildings are imperative in order to meet life-safety and ADA compliance. These mechanical systems need to be upgraded to provide greater energy efficiency and the buildings need to be waterproofed and weatherproofed to prevent air and water infiltration. This not only saves on ever-increasing energy costs, this also allows for the much needed Energy Upgrades and Agency Compliance for renovation of classrooms to better accommodate the needs of the 21st century Programming Updates (Impact: Up to seven student. $5 million would get the South Campus energy upgrades started, but buildings) ultimately $30 million is needed to complete the project. Immediately

Clinton Township

Macomb Community College described the need for a $24.5 million Health Science & Technology Classroom Building in its FY 2006 State Capital Outlay Request. The State Legislature approved a down-sized version of the project and funded it at $12 million when Macomb assured the State Legislature that it could construct this classroom building in two phases. Phase I was completed in June 2008 and classes were offered in the fall 2008 semester. The timing is perfect to now seek funding for Phase II of the project. Phase II will be a 30,000 square foot state-of-the-art facility, which will provide specialized laboratories for emerging technology-related health occupations and additional laboratories for basic science. To accomplish the two unmet goals of FY 2006, the College will construct and equip, in Phase II, four specialized computer labs to support instruction in content management, networking, information security, wireless technology, voice over IP (Internet Protocol), RFID (Radio Frequency Identification), and bioinformatics and two Health, Science, & Technology Building Phase anatomy and physiology labs and a microbiology lab to complement the one Biotechn 2 Immediately

Lansing, Michigan

Expected Completion Date

T O

June, 2011

D VE $

3,100,000 N/A

June, 2011

$

3,100,000 N/A

12/31/2010

$

30,000,000 Not Applicable

8/15/2011

$

14,500,000 Not Applicable

8/1/2009

$

250,000

8/1/2009

$

150,000

12/31/2009

$

3,500,000

O R

P P A

Funding Request

Route (Infrastructure Only)

N s

Macomb Community College

qu

d e tt

Macomb Community College

e R

t i m

b u S

MDA

East Lansing, MI

MDA

Williamston, MI

MDA

t s e

East Lansing, MI

02262009

Geagley Laboratory Infrastructure Improvements Heffron Laboratory Infrastructure Improvements

Repave and expand parking lot, elevator code upgrade, insulation, external panel replacement, safety/security improvements, steam valve and chiller pump replacement. Immediately Repave parking lot, replace roof, structural maintenance, construct equipment storage building Immediately

Motor Fuels Quality Lab Renovation

Upgrade motor fuels testing and storage areas to accommodate new requirements in the Motor Fuels Quality Act related to ensuring the quality of diesel, biodesel and alternative fuels. Immediately

Submitted Requests - Not Approved

1026 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

MDCH

MDCH

Kalamazoo

Westland

Project Name

Project Description

Start Date

Expected Completion Date

Replacement of psychiatric windows

The scope of this project is to remove approximately 435 single panel windows and reinstall energy efficient (double pane) psychiatric windows, with an interior security screen. The reinstalled windows must match, in appearance, the previously installed energy efficient windows. LEED principles can be anticipated in this project.

Provide a Second Electrical Feed to the Hospital

The hospital currently has one primary DTE electrical service that feeds a doubleended service center. A second power source would allow for energy conservation and continuous service without any disruptions. Disruptions have taken place in the past.

2009

Funding Request

D VE $

435,000

$

380,000

Various 6/1/2010

$ $

1,500,000 3,100,000

30 days

$

252,000

30 days

$

300,000

60 days

$

350,000

60 days

$

200,000

2/9/2009

4/9/2009

$

700,000

HV Site Perimeter Consolidation

This project consolidates the Huron Valley Mens Fac, Women Huron Valley Fac and Camp Huron Valley into one large facility. This work involves rerouting perimeter fence systems to enclose the entire site as one campus, interior control fences, removal of structures that are no longer used and in the way of the consolidation. Additional LED Perimeter lighting renovation of two vehicle sally ports, traffic rerouting and connecting passage routes. Consolidation of this site for the targeted population allows for the relocation of the population from the SCOTT FAC which is being closed to allow for reduction in operating costs. 1/9/2009

5/9/2009

$

1,400,000

HV Site Security Systems

This project will take the security and safety systems from 3 different facilities and relocate them into one combined control center. This will be done to allow the new system to operate as one large consolidated facility using the most current technology available. Including the new areas that will be encompassed by the consolidation of the perimeters. The new control center will incorporate site central monitoring for all existing and expected new buildings for the site. Included is CCTV Recording area and equipment. Consolidation of this site for the targeted population allows for the relocation of the population from the SCOTT FAC which is being closed to allow for reduction in operating costs. 3/9/2009

5/9/2009

$

1,100,000

MDCH MDE

Caro, Northville, Kalamazoo, Westland Flint

MDE

Flint

Multiple Roofing, doors, windows and energy saving projects MDE - rennovation of Fay Hal Michigan Schools for the Deaf and Blind (MSDB)- security fence

MDE

Flint

MSDB - generator replacement

MDE

Flint

MSDB - roof repair

MDE

Flint

MSDB - parking lot repair

P P A

TITLE IX – LABOR, HEALTH AND HUMAN SERVICES, EDUCATION - SUBTITLE B &C Rennovate 3rd and 4th floor, building envelope and add parking to Fay Hall. 120 days Repair existing fence and add fencing to completely enclose the Michigan Schools for the Deaf and Blind campus. 120 days

T O

Replace the current generator and add a generator to Stevens Hall. In the event of a power outage, the dormitory and school would be without power 90 days Roof repair to Fay Academy, Stevens Hall and Service building. These buildings include the dormitory and classrooms for students 120 days Repair and expansion of the blacktop parking lots at MSDB. Many parking lots are in poor condition, with potholes and surface cracking. 120 days

s t s

O R 2009

Roof replacements, doors and windows at multiple hospital/center facilities (Caro Center, Hawthorn Center, Kalamazoo Psychiatric Hospital, Walter Reuther Psychiatric Hospital).

-N

Route (Infrastructure Only)

e u

MDOC

MDOC

MDOC

Ypsilanti, Pittsfield Township

Ypsilanti, Pittsfield Township

HV Reception Guidance Center/ Intake Elevator Replacement

tt i m

d e t

b u S

Ypsilanti, Pittsfield Township

02262009

This project relocates the current women's RGC/ Intake from the Scott facility to the consolidated HV Facility. All the RGC? Intake functions will be placed to allow this population to be segregated until they can be placed in a general population unit. The ADA lift devices are being replaced in housing units 1 & 3 with commercial grade elevators to allow for long term daily use by an increasing population that requires wheel chairs for mobility. This project allows for the relocation of the population from the SCOTT FAC which is being closed to allow for reduction in operating costs.

q e R

Submitted Requests - Not Approved

1027 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

MDOC

MDOC

Project Name

Macomb, Lenox Township Macomb

Livingston County, Northfield Township

Project Description

Start Date

This project allows for the Residential Treatment Program portion of the current HVM mens population to be relocated to the currently closed Housing 7 at the Macomb Facility. Relocation of this population is integral to allowing the closure of the Scott Fac for operational savings. This project provides offices and group therapy space for the DCH team that will provide treatment to the inmates to be housed at this RTP Mental Health Housing Unit 7 location. 2/9/2009

6/9/2009

$

10,000,000

HV Relocation of Women Food Tech Program

This project relocates from the SCOTT Fac the women Food Tech program which provides training skills to women inmates in the food & hospitality industries. This project is necessary for the relocation of the population from the SCOTT FAC which is being closed to allow for reduction in operating costs. 4/9/2009

6/9/2009

$

500,000

This project allows for the replacement of the HVAC system in the Pugsley Administration building and for the remediation of moisture and mold as the result of the failure of the original HVAC system. Replacement will be a LEEDS certified unit.

6/9/2009

$

700,000

6/10/2009

$

6,000,000

Lakeland provides health care services for a largely geriatric inmate population. This project would build a 22 bed infirmary and remodel and enlarge the Health Care Clinic at Lakeland facility. Design would be LEEDS certified. 6/9/2009

6/10/2009

$

3,400,000

Brooks provides health care services for 1800 inmates and is part of a 3 facility group that has a combined 4,000 inmates. This project would provide 8 infirmary beds that would reduce the health cost to use off site vendors that currently provide this same service. This project would be designed to be LEEDS certified. 6/9/2009

6/10/2009

$

1,000,000

Oaks is to be an Michigan prisoner reentry Programming ( MPRI) site. This program provides training in life skills and job skills to ensure a successful return to society. This project would add to the existing programs building to provide 4 additional class rooms and support space. Additions to be designed to LEEDS certified. 6/9/2009

6/10/2009

$

2,000,000

T O

MDOC

MDOC

The current Health Care Clinic at Kinross is housed in a 2,700 Sf Modular unit and is expected to serve 1800 inmates on a daily basis. This project would provide a building designed to service 1800 inmates and also provide for a 18 bed infirmary in the same building. This would provide proper facilities for a health care unit and operational Chippewa County, Kinross Kinross health Care Clinic & Infirmary - new savings for having infirmary facility on site. Building would be designed for LEEDS Certification. 6/9/2009 Township Building

MDOC

Branch County, Coldwater Lakeland 22 Bed Infirmary and Renovated Township Health Care Unit

N s

t s e

2/9/2009

u q e

R d

e t tt

i m

Muskegon County, City of Muskegon Brooks 8 Bed Infirmary Unit

b u S

02262009

900,000

O R

P P A

Grand Traverse , Kingsley Township Pugsley HVAC Replacement Adm Bldg

Manistee County, Manistee Township

D VE $

Maxey Acute Care Mental Health Care Program relocation and site transitioning

Ypsilanti, Pittsfield Township

MDOC

5/9/2009

Funding Request

MDOC and MDHS is partnering to repurpose the W.J. Maxey site to allow optimizing of the site for MDHS operations and the select Mental Health program requirements for MDOC Acute Care unit currently located at Him which must be moved to allow the closure of the SCOTT Facility. This program will refit the closed Green Oaks unit to meet the DHS Bureau of Juvenile Justice for a maximum of 100 clients. The Woodland Center would house the Acute care program and the Huron Center would be repurposed for RSC programming. In addition a 22 bed infirmary would be created in the Academic Center to operate with the mental health programming. 2/9/2009

MDOC

MDOC

Expected Completion Date

Oaks

Programming Expansion

Submitted Requests - Not Approved

Route (Infrastructure Only)

1028 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

MDOC

MDOC

Jackson, Blackman Township Ypsilanti, Pittsfield Township

Project Name

Project Description

Start Date

Expected Completion Date

Parnall MSI Fence

The closure of Southern Michigan Prison in 08 the MSI workers that where at this site where relocated to the Parnall Facility and are currently bussed to work at the MSI factories located on the north side of the Jackson site. This project provides a secured traffic path to allow inmate workers to walk to the north MSI factories. This also allows the removal of semi truck traffic through the Parnall Fac to the MSI factories. -This reduces the long term cost for bussing and greatly increases the safety / security factor for the general public, staff and inmates. Note all of door lighting in this project is LED and is motion controlled. 3/9/2009

HV Sewage Lift Station

Replacement of existing deep well sewage lift station at the Huron Valley Corrections site. This is a infrastructure project that is necessary to maintain the operational safety of this site. 4/1/2009

Egeler Perimeter Consolidation

C Unit is a medical specialty housing unit that currently exists outside the Egeler secured perimeter. The medical nature of these inmates requires frequent transportation for medical appointments at the Duane Waters Health Care Unit which is inside the Egeler secured perimeter. Consolidation of the perimeter to bring C unit inside the secured perimeter would be a immediate operational savings by eliminating the need for special transport details. This project would relocated the public access road to Duane waters Heath Care unit, relocate the Egeler secured perimeter to include C Unit, provide a road access from the Egeler interior roadway to C Unit. Provide the addition perimeter light which will be LED lighting, and secure systems. 4/9/2009

T O

P P A

O R

-N

8/9/2009

Funding Request

D VE $

700,000

9/1/2009

$

2,000,000

9/9/2009

$

1,700,000

9/9/2009

$

500,000

MDOC

Jackson, Blackman Township

MDOC

Muskegon County, City of Muskegon Muskegon Food Tech Program

This project would provide a Food Tech training program at the Muskegon facility. This program provides training for job skills in food service industry.

Detroit, Wayne County

The adding of 18 infirmary beds to location allows the department to realize operational savings to our health care costs by reducing the number of hospital days during recuperation periods. The segregation area of Mound Fac is located near the health clinic and would be converted to 18 infirmary grade beds. 5/9/2009

10/9/2009

$

1,000,000

This project allows for the relocation of the MSI factory operation at the closing SCOTT Fac to the RYAN Fac. In addition to creating jobs for the RYAN Fac a new training program is proposed. The R Tech program will be closing aligned with the Michigan Prisoner Reentry Program ( MPRI) providing new skills job training for prisoners. This dual programming JOBS & JOBS Training is a positive move to reduce future prison costs.

5/9/2009

10/9/2009

$

1,500,000

This project replacements the existing sewage lift and adds sewage grinder. This is at the request of the City of Muskegon Waste Water Treatment Authority. 5/9/2009

10/9/2009

$

500,000

Cooper Health care Addition

Cooper Fac was original designed to house 900 inmates. Current it houses 1750 inmates and is the main hub for the MPRI programming in region 1. This project would allow for the expansion of the health care and mental health treatment programming for the targeted population of 1750 inmates. The expansion involves an addition of 4,000 sf to the administration building to relocate the health clinic and dental clinic, remodel the current health clinic area ( 2,700 sf) for the mental health programs. The new and remodel areas would be LEEDS certified 5/9/2009

5/1/2010

$

3,000,000

HV Food Service Production Building

This food production building provides complete facilities to provide 2,400 meals per sitting on site and 1,000 meals shipped to satellite locations. Facilities to include preparation areas, production, bakery, dry storage refrigerated storage, delivery docks, 400 person dining hall. Building is being design for Leeds certification 5/1/2009

6/1/2010

$

7,000,000

MDOC

d e t

Ryan MSI Factory Relocation & R TECH Training Facility

MDOC

Detroit, Wayne County

MDOC

Muskegon County, City of Muskegon Muskegon Sewage Lift Station

MDOC

MDOC

u S

Jackson, Blackman Township

Ypsilanti, Pittsfield Township

02262009

5/9/2009

e u

Mound 18 Bed Infirmary

itt

s t s

bm

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

1029 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

MDOC

Ionia, Ionia Township

MDOC

Ionia, Ionia Township

MDOC

Kinchloe

Project Name

Project Description

Expected Completion Date

Start Date

Michigan Reformatory Sally Port relocation

The current traffic sally port at Michigan reformatory does not meet secure standards nor does it allow for the passage of a semi truck & trailer with opening both gates. This provides for this system to be relocated and upgraded to current standards. 5/9/2009

6/1/2010

Michigan Reformatory Storm Water Separation

This project is necessary to meet EPA storm Water compliance requirements . This site is a turn of the century facility that is not up to current storm water standards and must be corrected. 5/9/2009

11/1/2010

Toilet shower additions

The current toiler and shower rooms for inmate housing units 1,2, 3, 4 and 5 do not meet the needs for the inmate population. By installing proper toilet and shower facilities for each housing unit, the MDOC will be able to utilize the building and increase bed space for additional inmates.

O R

6/9/2009

Michigan State University

East Lansing

B. Greenhouses Construct Additional

B. Construct approximately 30,000 gross square feet of additional greenhouse space at the site of the existing plant science facilities and resources. See introductory write-Confirmation of up for details. Funding

Michigan State University

East Lansing

D. Greenhouses Renovate Existing

D. Renovate greenhouses in the east/west range which is at the site of the existing plant science facilities and resources. See introductory write-up for details.

C. Chittenden Hall Historical Renovation for Graduate School

East Lansing

d e tt

t i m

Michigan State University Michigan State University Michigan State University

b u S

East Lansing

B. Student Services Building Renovation Student Support

East Lansing

A. Plant Biology Building Addition

East Lansing

C. Plant Biology Building Renovation

02262009

$

1,000,000

$

1,000,000

$

5,000,000

D VE

12 months from shovel ready

$4.0M

NA

Confirmation of Funding

12 months from shovel ready

$3.9M

NA

C. This project consists of a historical renovation of this13,400 gross square foot facility to accommodate the Graduate School. The project would include a comprehensive renovation to address maintenance, code, and programmatic enhancements, including new windows, barrier-free access, and interior modifications to create appropriate work areas. The Graduate School is currently located in Linton Hall, which is the primary location for the College of Arts and Letters and selected programs. With the relocation of the Graduate School, the College of Arts and Letters would be able to accommodate long-standing space needs associated with programs of the college. The Graduate School would gain an identifiable location on north campus with adequate and appropriate space to meet current and future needs, including the challenges of increased participation and additional demand for Graduat School services. Having the physical capacity to provide those services will be critical to an increase in graduate student enrollment and the successful matriculation of Confirmation of those students. These students will be the next generation of new-economy employee Funding

12 months from shovel ready

$5.0M

NA

B. Renovation of approximately 120,000 square feet for student support functions. The programs and services that are or would be housed in the facility are primarily within the Office of Student Affairs and Services. The programs and services offered by this office are designed to create a stimulating and supportive environment that enhances the personal development, learning and educational success and career preparation of all students. This project will renovate space to accommodate the consolidation and alignment of various student support functions from other locations and those currently residing in the building. The goals are to make the building a destination for students, improve space utilization and improve the building image. The work scope will include deferred maintenance such as new windows and upgrade of heating, ventilation, and air conditioning; new walls, ceiling, lighting and related interior finishes and furnishings to accommodate the new and realigned occupants and functions; safety and security upgrades; accessibility and way-finding. Release Confirmation of space will become available in other buildings as a result of this renovation. This releaFunding

18 months from shovel ready

$21.0M

NA

A. Plant Biology Addition of approximately 89,000 gross square foot addition at the site of the existing plant science facilities and resources. See introductory write-up for Confirmation of details. Funding C. Plant Biology Building renovation of teaching and research facilities. See Confirmation of introductory write-up for details. Funding

24 months from shovel ready 24 months from shovel ready

$57.6M

NA

$33.7M

NA

A T

s

Michigan State University

PP

6/1/2011

Funding Request

Route (Infrastructure Only)

t s e

O N

qu

e R

Submitted Requests - Not Approved

1030 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Michigan State University

East Lansing

Project Name

Project Description

Expected Completion Date

Start Date

24 months from shovel ready

E. Engineering Building Addition

E. Engineering Building Addition of approximately 90,500 gross square foot at the site Confirmation of of the existing Engineering Building. See introductory write-up for details. Funding

F. Engineering Research Complex Building Addition

F. Construct an addition of 51,000 gross square feet to the Engineering Research Complex–Energy and Automotive Research Laboratory wing that will increase the research capacity and access of qualified students to a modern engineering education. The addition would include research and teaching laboratory space, as wel as faculty, graduate student, and staff offices and support space. This additional space would increase the research and education opportunities for both undergraduate and graduate students and allow for expansion of the research program in the growing area of energy and transportation research, including the Composite Vehicle Research Center, hybrid vehicle research, and energy generation (e.g. fuel cells), conversion, and control. The opportunities presented by this proposed addition are consistent with the challenge to increase participation in higher education and to create a highly skilled work force in support of economic development and Confirmation of growth in the state of Michigan. Funding

24 months from shovel ready

$22.9M

NA

Interdisciplinary Science and Technology Building New Construction

Construct a building of approximately 225,000 gross square feet to support current and emerging scientific inquiry in the areas of food, health, engineering, plant sciences and technology. Emerging trends and research themes include neuroscience, quantitative biology, cardiovascular biology, and translational medicine. Incorporation of animal care facilities and shared technology resources are features that would promote these research themes. Construction adjacent to the Biomedical and Physical Sciences building would foster collaboration and create a neighborhood of scientific inquiry across disciplines that have current and future potential to expand their national research impact. While Michigan State University has existing and “virtual” interdisciplinary programs, there is untapped research potential that can be developed with the establishment of a facility that places researchers together based on common research themes. This building will improve the university’s ability to successfully compete for larger multidisciplinary grants by facilitating scientific Confirmation of interactions in designated thematic areas. This facility would provide additional capaci Funding

24 months from shovel ready

$150.0M

NA

Comprehensive building renovation of this 257,700 gross square foot facility for teaching and research in the STEM disciplines - science, technology, engineering and math. This is a 60-year old facility with research, instructional and administrative space, used primarily by the College of Natural Science. The college has a key role in research and teaching of the STEM disciplines, which has been identified as an area for needed investment both locally and nationally. The facility has received very limited renovation during its lifetime. However, it is structurally sound and can continue to serve the College of Natural Science and the University successfully with reinvestment. The renovation would be comprehensive in nature to address maintenance, code, and programmatic improvements. More specifically the improvements would include upgrades and installation of modern heating and ventilation systems, including air conditioning; and renovations to support programmatic needs, such as upgrade of research and teaching laboratories in Confirmation of support of the college and university’s mission. The programmatic areas include a signFunding

24 months from shovel ready

$86.0M

NA

O R

Michigan State University

East Lansing

Funding Request

Route (Infrastructure Only)

T O

P P A

$54.3M

NA

D VE

N s

Michigan State University

East Lansing

d e tt

Michigan State University

t i m

b u S

East Lansing

02262009

Natural Science Building Comprehensive Renovation STEM Disciplines

t s e

qu

e R

Submitted Requests - Not Approved

1031 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan State University

Project Name

Project Description

Start Date

Funding Request

Route (Infrastructure Only)

East Lansing

A. Construct a new facility of approximately 52,000 gross square feet. The current Morrill Hall Building opened in 1900. The building is comprised almost entirely of faculty offices and departmental support spaces. The departments of English, History, Religious Studies and African American and African Studies occupy space in the building. Monitoring of the internal wooden structure has revealed deterioration, indicating that the building is approaching the end of its useful life. The University has determined that an internal reconstruction and exterior restoration project, along with the high deferred maintenance needs is prohibitively costly. Given the condition of the building, a new location must be planned for the current occupants of Morrill Hall. New construction offers an opportunity to improve the quality of space for its current occupants, to achieve a more efficient use of space through effective design and allocation, and to provide for more effective academic program adjacencies and A. Morrill Hall Building Academic Replacement consolidations, such as the co-location of language programs, which currently occupy Confirmation of Space space in three buildings. The new facility will accommodate current and projected futuFunding

East Lansing

D. Clinical Center B-Building Renovations Biomedical Research

D. Comprehensive renovation of approximately 77,000 square feet at the Clinical Center B-Building in support of biomedical research. This facility was constructed in 1976 and has received limited renovations. The intent is to create modern and flexible research space as well as addressing deferred maintenance and heating, ventilation and cooling needs. As part of the overall university strategy to increase research in areas such as biomedical research and funding from sources such as the National Institutes of Health it is critical that modern laboratory space be available to accommodate this growth. It is also key in the recruitment and retention of faculty and graduate students. Departments such as Surgery and Medicine would benefit from anConfirmation of investment in this facility. Funding

24 months from shovel ready

$23.0M

NA

East Lansing

Projects within this request include roof repair and replacement; electrical, mechanical, chiller, refrigeration, and steam system renovations; window replacement; heating, cooling, and air conditioning repairs; structural system repairs; fire alarm upgrades; sprinkler systems; smoke detection systems; and building security system improvements. The assessment of existing facilities shows the infrastructure components of many campus buildings have aged significantly. Even with ongoing maintenance and repair, they are now at a point where they can no longer be repaired or replaced. Safety standards have changed over time and there is a need to improve and update these systems. This project consists of a set of defined projects that have been identified as the highest priority deferred maintenance and life safety items. The projects have been identified through facility condition appraisals and system evaluations, including input from university maintenance and custodial Just-in-Time/Deferred Maintenance and Utility staff, users of the buildings, and “just-in-time” analysis. This approach considers the Confirmation of age of major building components, adjusted for maintenance history and current cond Funding Infrastructure

24 months from shovel ready

$70.6M

NA

O R

A T

Michigan State University

Expected Completion Date

s

t s e

PP

O N

D VE

24 months from shovel ready

$36.0M

NA

u q e

Michigan State University

R d

i m

b u S 02262009

e t tt

Submitted Requests - Not Approved

1032 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Michigan State University

Michigan State University

Michigan Technological University Michigan Technological University

Michigan Technological University

Michigan Technological University Michigan Technological University

East Lansing

East Lansing

Houghton, Michigan

Houghton, Michigan

Houghton, Michigan

Houghton, Michigan

Project Description

Start Date

Funding Request

Bioeconomy Expansion: Additions and Renovations (See A-F Below)

Additions and renovations to support research and instruction in support of development and sustainability of the bioeconomy; increase in the number of funded faculty positions and grants associated with bioeconomy initiatives such as the Great Lakes Bio-energy Research Center. Opportunities include the creation of a highly skilled workforce in support of economic development and growth in the State. As part of the planning process, the university concluded that additional and modern research and teaching space is needed in the plant sciences. This will be achieved by additions and renovations at the existing sites of plant sciences and engineering facilities and programs. Michigan State University is a leader in plant sciences, but current facilities are inadequate, both in quantity and quality, to meet present and future needs for research and instruction. The current research challenges include broad areas of bioeconomy and bioconversion, energy and transportation, nutrition, plant development, environmental responses, cellular organization, host–pathogen interactions. Opportunities exist to participate in advancements in the bioeconomy initi

Renovation of Historical and Critical Space (See A-D Below)

Renovation and replacement of space for core academic units, student support functions, and biomedical research. These facilities were constructed between 1900 and 1976. Impact will include student tuition dollar savings, as well as improved Confirmation of access to core facilities and programs. Funding

Military Vehicle Mobility Center

Expand the physical plant of the Keweenaw Research Center at Michigan Tech. The Center does extensive research for the Dept. of Defense and this expansion would further increase the capacity to serve those research needs. Expansion would also increase the capacity to support private sector companies in their research applications, especially in the area of vehicular improvement including those related to safety. Within 90 Days

Within 12 Months from Start Date

$

10,000,000

Alternative Energy Center

This new facility would allow for research to enhance the fuel performance of existing engines as well as provide needed additional facilities to house cutting edge research on hybrid vehicles, fuel cells and various alternative energies. Within 120 Days

Within 15 Months from State Date

$

10,000,000

Center for Research on Advanced Technologies

The expansion of the Mechanical Engineering facility would enhance the cutting edge research being conducted to improve manufacturing efficiencies to make American products more globally competitive. Interdisciplinary teams would conduct research in such areas as green engineering, virtual assembly/disassembly, take back logistics and product value assessments. Future generations of engineers would be educated and trained with a focus on sustainable processes in both macro and micro/nano manufacturing. Within 120 Days

Within 18 Months from State Date

$

21,000,000

Sustainable Transportation Center

This Center would provide additional research facilities to expand existing cutting edge work in the various areas of transportation research, including aggregates, coatings, materials, sensors and rapid replacement technologies with the aim of reducing the time and cost of maintenance, replacement and new construction, as well as significantly lengthening the life of transportation structures. Within 120 Days

Within 18 Months from State Date

$

30,000,000

Fisher Hall II

This expansion to the existing facility would add badly needed space for classrooms, laboratories and research, especially expanding the cutting edge efforts being undertaken in physics, mathematics and computational science. Within 120 Days

Within 20 Months from State Date

$

50,000,000

A T

s

t s e

O R

O N

u q e

i m

e t tt

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

PP

R d

b u S

Houghton, Michigan

02262009

Project Name

Expected Completion Date

$177.0M Below)

(See A-F NA

$85.0M (See A-D Below)

NA

1033 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Mid Michigan Community College

Project Name

Project Description

Start Date

Expected Completion Date

Harrison/Hatton Township Health Science & Technical Training Center

The Northern Mid Michigan Community College Campus serves Clare and Gladwin counties where unemployment rates are among the highest in Michigan and the number of people living in poverty ranks the 2nd and 3rd highest in the State. Serving this population drives our need to renovate and modernize our aging facilities that are inefficient mechanically, electrically, and structurally under today’s Green Globes, Energy Star, and LEED Green building rating system. This project includes the installation of solar panels and upgrades in HVAC equipment which would transform our main instructional facility into a highly energy efficient building. Modernization would also include the installation of multi-media educational technology and accessibility and security enhancements. The project would reallocate renovated space for the creation of a Health Science and Technical Training Center in partnership with the Clare-Gladwin Regional Educational Service District and local schools. The Center would unify our current and planned technical programming in high demand training and certification areas identified by MiWorks!, students, and indu5/15/2009

Mt. Pleasant/Union Township

Fueled by dramatic student demand in Isabella County and strong relationships with Central Michigan University and local hospitals, enrollment at Mid Michigan Community College has increased by 80% since 2000. The growth drives the need for expanded facilities; currently, we offer only 117 square feet per contact hour equated student as compared to 177 square feet offered by other Michigan community colleges in our size category. MMCC must replace an aging, converted office building that currently houses vital student services functions and robust academic programs, but that suffers from security and accessibility issues as well as mechanical, structural, and electrical inefficiencies. The replacement building would utilize the Green Globes, Energy Star, and LEED Green building rating standards while also unifying all of the College’s operations in the county on one campus site, thereby controlling costs while increasing operational, staffing, and energy efficiencies The proposed building would expand our service to the community by offering additional health science programming, occupational instruction identified by business 7/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

9/9/2010

$

13,290,080

6/1/2011

$

24,832,000

Aug '11

$

17,000,000

6/30/2011

$

10,000,000

6/1/2009

$

1,600,000

7/1/2009

$

750,000

8/1/2009

$

5,850,000

N s

Mid Michigan Community College Monroe County Community College

Monroe

Center for Health Science & Alternative Energy Research

Career Technology Center

d e tt

ub

Montcalm Community College Greenville, MI Mott Community College Mott Community College Mott Community College

Fenton

S

qu

e R

t i m

MTEC Renovation & Expansion Relocation of Institute for Medical Simulation to Southern Lakes Branch Center

t s e

New building to house instructional programs in career related fields

The MTEC Renovation & Expansion project will create partnerships that have a distinct focus on growing green manufacturing, rural health care and people with bachelor’s degrees. It will embody a collaborative model to move rural youngsters from K-12 to higher education and completion of bachelor degrees. In order to sustain the vitality of this new economy, this project will focus on the need for workers to “Keep Learning – Our Future Depends On It”, emphasizing awareness and exploration of careers that will create a brighter future. We will develop a health careers training center that will create an early/middle college to serve high school students, expand community college certificate and degree programs for traditional students and displaced workers, and provide access to bachelor degree programming through the area’s first University Center. 7/15/2009 Renovation of portion of SLBC to accommodate Phase I and Phase II of the IMS, a program that trains healthcare professionals in new techniques and procedures using simulated human patients 4/1/2009 Consolidation of informational and educational technology departments into one central location at Curtice-Mott Complex 4/1/2009

Flint

Curtice-Mott ITS Consolidation

Fenton

Renovations to accommodate operations and program changes required to accommodate Continuing Education and Corporate Training Services in addition to Southern Lakes Branch Center Rehabilitation current programs.

02262009

Currently selecting architects

Submitted Requests - Not Approved

4/1/2009

1034 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Mott Community College Flint Mott Community College Flint

Project Description Conversion of natatorium to wellness center, including necessary asbestos Durham Wellness Center abatement. West Wing elevator and HVAC systems replacement; Finishes and doors Mott Memorial Building West Wing Renovation replacement.

Mott Community College

Flint

Mott Memorial Building Television Education Studios

Conversion of old public broadcasting facility in basement of Mott Memorial Building to modern TV and film production studio for audio-visual teaching programs 6/1/2009

Mott Community College

Flint

Prahl College Center Student Services and Culinary Arts Renovation

Renovation to provide expanded and centralized student services functions, student life functions and enhanced and consolidated culinary arts academic programs.

Flint

Mott Library Renovation

Flint

Physical Plant Operations Facility

Renovation of Third Floor; Replacement of exterior window systems and repair of masonry systems; HVAC improvements; Toilet, elevator and other system improvements. 6/1/2009 New facility to house Physical Plant Operations, including expansion of Public Safety, relocation of Shipping/Receiving. 6/1/2009

Flint

Renoation of portion of Ballenger Field House to provide adequate facilities to Ballenger Field House Athletics Administration administer the College's athletic programs, including toilet and locker room changes, Renovation coaching offices and coaching/officiating dressing facilities. 6/1/2009

Windsor Township

Enlarge the existing Lansing Forensic Science laboratory at its current location. This request is for construction of a new wing on the existing building on land currently owned by the state. The Lab currently has a backlog. In addition, MSP is absorbing additional casework that was absored by the Detroit Police Department in the recent Enlarge Lansing Forensic Science Laboratory past. 4/1/2009

Mott Community College Mott Community College Mott Community College

MSP

MSP

Marshall

Muskegon Community College Muskegon

Project Name

Start Date

Expected Completion Date

Funding Request

4/1/2009

8/1/2009

$

1,280,500

6/1/2009

8/1/2009

$

1,210,200

$

1,373,500

$

2,850,000

3/1/2010

$

8,156,000

6/1/2010

$

6,000,000

12/1/2010

$

1,100,000

9/1/2010

$

12,000,000

$

3,800,000

9/1/2009

$

1,500,000

Four Mile creek runs through the heart of the MCC Campus and into a campus natura area. This waterway originates as a part of the Muskegon River watershed and feeds into Muskegon Lake. Over the years, silt build up has altered the depth of the creek causing drainage system problems and endangering native fish species. Dredging of the portion of the creek flows through the campus proper is needed to improve water quality, avoid future drainage problems and aid in maintaining native fish species . A Riparian Buffer Zone to be established maintaining a minimum of twelve feet as unmowed and non chemical area along any water way. 4/1/2009

9/1/2009

$

1,000,000

Muskegon Community College’s Carr-Fles Planetarium has served the College and the grater lakeshore community since 1972. More than 150,000 visitors have viewed sky shows, free of charge, presented for the general public and the local school systems. The planetarium is also used for astronomy instruction at the College, as it has an excellent capability to model the night sky. The current technology used to present the planetarium programs is outdated based on slide projectors and analog sound. An upgrade to a digital planetarium instrument with coordaniting digital sound is necessary. In addition to the equipment, theater type seating, wall renovations, wiring and flooring will complete the renovation. 7/1/2009

12/1/2009

$

1,000,000

T O

s t s

O R

7/1/2009

P P A

-N

Relocate Battle Creek Post

Relocate the Battle Creek Post to Marshall Michigan in order to better respond to requests for service in the area. The current post is a WPA era building with significant structural problems. Its location is in a congested city area that inhibits response times. This is a request for new construction and real estate purchase.

roof replacement

Based on a 11/08 analysis, replace the entire roof og the main academic building and the gymnsium. Complete tear orr of old materials, install 4" polyisocyanurate roof insulation (R value 24) and a 60mil fully adhered EPDM roof system. 4/1/2009

e u

eq

10/1/2009

12/1/2009

Route (Infrastructure Only)

D VE

R d

Muskegon Community College Muskegon

i m

b u S Muskegon Community College Muskegon

02262009

e t tt

Water Quality improvements to Four Mile Creek

Planetarium

Submitted Requests - Not Approved

1035 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Muskegon Community College Muskegon

Project Name

Project Description

Start Date

Gymnasiun expansion

The gymnasium is the most utilized building opn the MCC Campus interms of hours used.It is a major resource for student, faculty and the community. The Gym includes classrooms and a small fitness center – primarily for instructional use and for student athletes. These facilities are not adequate to address all of the needs of our students, staff and community.This recommendation expands the building to take even greater advantage of the expressed need for facilities such as a wellness center, expanded fitness center facilities, expanded office and locker space for staff and coaches of the many sports represented at MCC. It provides an opportunity for community outreach as a place for training for lifelong health and fitness. 8/1/2009

Art Education Center

The arts and humanities areas at the College, as well as in the community has become in great demand. The College’s visual arts instructional areas are currently housed in a “pole-Barn“ type building, which is inadequate for the needs and demands of the program. There is no area within the structure for exhibition. Classroom space is non existent. All ceiling heights are over 20’, resulting in inadequate lighting and inefficient heating and cooling. Due to the extreme in temperatures in the facility, storage of art works are negligible. The new Art Education Center would be approximately 20,000 square feet and be constructed on college property in the north east section of the campus or in downtown Muskegon as a joint project with the Muskegon Museum of Art. The new facility would provide “new” space for a gallery, auditorium, exhibition area and storage areas as well as traditional classrooms . With the additional space, both studio and traditional classes would have enrollment expansion potential. Learning opportunities would expand for both students and publi with new gallery and exhibition space. These spaces would also offer MCC the oppor 9/1/2009

T O

Muskegon Community College Muskegon

Expected Completion Date

O R 8/15/2010

Funding Request

Route (Infrastructure Only)

D VE $

3,000,000

$

5,500,000

$

5,500,000

$

1,127,117

P P A

N s

t s e

The Biology and Chemistry disciplines are core to a number of academic programs at MCC including all Health Sciences. The demand for these courses is strong and consistent. These classes have consistently filled and additional lab space would offe the opportunity to increase class offerings. The Biology and Chemistry laboratories were constructed in 1965. Some modest modifications and upgrades have been made to the labs over the years but, the original design and materials are in place in the majority of the labs. Water and Natural gas lines as well as the HVAC ventilation systems need upgrades to offer a safe and high quality laboratory experience. The Science Laboratory Center would be a 25,000 square feet two level addition to the current Science wing located on the northwest side of the Main Campus building. The current lab room space, approximately 20,000 square feet, would be renovated into science classrooms. The new facility would provide “new” space for instruction of 21st century laboratory technologies. The additional laboratory space will allow for enrollment expansion in the Health related disciplines as well as general chemistry an

u q e

R d

Muskegon Community College Muskegon

i m

b u S North Central Michgan College Petoskey MI

02262009

e t tt

12/1/2009

Science Laboratory Center

Sanitary riser renovation in Residence Hall

Priority #2 The residence hall at North Central Michigan College was built in 1968. Because the facility is over 40 years old, the plumbing in the facility is leaking and in some cases "oozing" through the walls. We have repaired leaks as they happen, but it has become evident that we need to remove and replace sanitary risers in each bathroom. In addition to the riser renovation, each bathroom will also receive an upgrade of plumbing fixtures, new tile, new doors, and hardware. The existing floor of each dorm room will be replaced at this time as well; the dorm room flooring is currently 9x9 asbestos tile. This is a health safety issue. One wing of the Residence Hall will be completed in the first summer, and the second wing will be completed the 6/1/2009 following summer. (2) 6/1/2010

Submitted Requests - Not Approved

9/2009 9/2010

1036 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Priority #1 This is far more than aProject buildingDescription renovation project request. This project is a workforce development initiative.

Expected Completion Date

Start Date

North Central Michigan College requests $10,428,400 for the renovation and addition to the current chemistry and science buildings (Health Education and Science Center) A project of this size would have a tremendous impact on our entire region. It would lead to employment for hundreds of people. And once the building project is completed, we would be training workers to fill positions that are currently going unfilled in our local health care institutions. This is workforce development from beginning to end! Health care is the largest and fastest-growing industry in the northern Lower Michigan counties served by North Central. Northern Michigan Regional Hospital (NMRH) based in Petoskey is a 243-bed regional referral hospital with a staff of 1,700 including more than 200 physicians, 536 registered nurses and an annual payroll of $77.9 million. The majority of registered nurses working at NMRH graduated from North Central's nursing program. Charlevoix Area Hospital, a 25-bed community hospital se North Central Michigan College

O R

Funding Request

D VE

P P A

Renovation and addition to the chemistry and North Central Michigan College has a duty to provide quality instruction in these areas science building

T O

Northern Michigan University

Marquette

Campus Energy Management System and Efficiency Improvements

Replace/upgrade HVAC systems and energy management systems in mission critical facilities to provide energy efficient operation and improve occupant comfort. 5/4/2009

8/13/2010

$

22,000,000

Northern Michigan University

Marquette

Superior Dome Convention and Athletic Center Repair and Renovation

Renovation of regional convention and athletic center to accommodate addtitional offices and locker room facilities and repair building envelope to preserve structure.

8/13/2010

$

8,500,000

Marquette

Jamrich Hall Renovation

8/13/2010

$

15,000,000

Marquette

8/13/2010

$

4,000,000

Marquette

Rural Education Broadband Initiative Lee Hall U.P. Visitors and Alumni Center Reuse and Renovation

6/1/2009

8/13/2010

$

8,800,000

Marquette

Biomass Fueled Heat & Power Cogeneration Plant & Alternative Energy Research Facility Construction of new biomass fueled circulating fluidized boiler with 10 MW steam (permit approved, may need amendment) turbine to supply steam and electricity to campus facilities.

7/6/2009

11/1/2011

$

65,000,000

12 months

$

700,000

Northern Michigan University Northern Michigan University Northern Michigan University

Northern Michigan University

Route (Infrastructure Only)

d e tt

Northwestern Michigan College Traverse City

ub

t i m

N s

6/1/2009

st

Renovation of academic lecture and teaching facility to provide energy saving infrastructure and advanced technology innovations and improvements in classrooms.6/1/2009 Expand wireless broadband (WiMAx) access to university and public school students and faculty throughout rural Marquette County. 5/4/2009

e u

q e R

Safety, Security, and Emergency Response

Renovation of second oldest campus building for reuse as visitor and alumni center.

Safety, Security, and Emergency Response projects will allow us to enhance campus safety and respond to emergency situations at all campuses. Safety and security will be enhanced with the installation of electronic card access systems and surveillance cameras in all buildings. Additionally, NMC does not currently have an efficient way to communicate with faculty, staff and students in emergency situations. Installation of public address systems in all buildings, as well as external Public Announcements systems on main campus, will ensure our ability to respond quickly and efficiently in 90 days from the event of a crisis or weather emergency. project approval

S 02262009

Submitted Requests - Not Approved

1037 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Northwestern Michigan College Traverse City

Project Name

Project Description

Start Date

Energy Conservation Infrastructure

Energy Conservation Infrastructure projects include: Installation of a building management system and HVAC upgrades designed to control heating, air conditioning, and lighting to reduce electrical consumption in all NMC facilities. This system will be tied into class scheduling software to maintain comfortable temperatures and adequate lighting levels only when rooms and buildings are in use. This project will result in an approximately 10 percent reduction in energy annual costs. Installation of geothermal and wind turbine technology at NMC’s University Center, Michigan-Technical Education Center, James J. Beckett Building and Dennos Museum Center to reduce consumption of electricity. Replace failing roofs, increase insulation, and retrofit roof drains on select buildings. Roofs will be replaced with white reflective roofing material, and insulation quantity and quality will be enhanced to maximize energy conservation during both heating and cooling seasons. Roof drains will be retrofitted so rain water can be harvested and recycled for site irrigation to 90 days from reduce potable water consumption. Replacement of existing windows with new energ project approval

O R

Oakland Community College

Oakland Community College

Auburn Hills

Royal Oak

Rochester

02262009

D VE $

4,800,000

Eco-Learning and Transit Hub

The Eco-Learning and Transit Hub involves a 40,000 gross square foot renovation and repurposing of a Leeds Platinum Student Learning Center and Transit Hub. The project will interconnect the five college campuses via four biodiesel/electric-powered buses and include the construction of transfer stations at these sites. In conjunction with NMC’s Energy Demonstration Center, operations of the building will be used as an academic “green project” to certify a green-ready workforce. Student Learning Center (SLC)—The SLC will hold classrooms, a full complement of student services, bookstore and campus dining to serve the 5-campus NMC student population. Renovation will incorporate Leeds Platinum technology, including: solar/wind turbine driven geothermal heat pumps; lighting control system programmed to compensate for daylight levels and to turn lights on or off depending on whether rooms are occupied; ventilation delivered to occupants from the floor, not the ceiling, which increases occupant comfort and saves energy; and close access to public bus stops. 120 days from In addition to energy efficiency, maintenance of the Student Learning Center will provi project approval

2 years

$

22,500,000

HVAC/Electrical Switchgear Replacement & Interior Renovations Bldgs H, J, K

Deferred maintenance items include HVAC and electrical switchgear replacement, repair and replacement of electrical wiring, plumbing, and lighting, and replacement of heating, ventilation, and air conditioning systems. Buildings currently house our Police and Fire Academies, classrooms, gymnasium, and childcare facilities. 08/03/2009

09/30/2011

$

8,200,000 N/A

Project includes extensive demolition, renovation of current space and mechanical/electrical replacements including replacement of electrical wiring, lighting, heating, ventilation, and air conditioning systems. Building current houses general classrooms. 08/03/2009

09/30/2011

$

12,255,000 N/A

12/1/2011

$

48,000,000 N/A

s

Interior Renovations Building D

t s e

t i m

O N

u q e

R d

e t t

b u S Oakland University

PP

Funding Request

Route (Infrastructure Only)

18 months

A T

Northwestern Michigan College Traverse City

Expected Completion Date

With the construction of this combined biomass and wind energy plant, Oakland University will be the first university to make such wide and cost-efficient use of alternative and renewable energy sources. A biomass fuel heating plant would save Oakland roughly 65 percent in annual raw heating fuel costs. The accompanying windmill energy plant will generate approximately 20 percent of the university’s electrical needs, and over a short period of time, the return on investment will be substantial. Cost-effective, environmentally friendly and highly efficient, a heavier reliance on alternative and renewable energy resources makes sense today and for generations to come.

Biomass/Wind Energy Plant

5/1/2009

Submitted Requests - Not Approved

1038 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Oakland University

Oakland University

Oakland University

Oakland University

Project Name

Project Description

Start Date

Rochester

Oakland University continues to be one of the fastest growing universities in the state. Oakland’s gross square footage per student is the lowest in the state, and classroom space is at a premium. Technology upgrades, energy efficiency improvements and technology training services would be important components of the new classroom building. Additional academic space would enhance students’ learning experiences and better accommodate the expanding and evolving instructional needs of our Technology and Learning Classroom Building faculty. 5/1/2009

Rochester

Medical Education Building

Oakland University is in the midst of establishing the first new medical school in Michigan in 20 years. A dedicated, permanent Medical Education Building is a key centerpiece to the new medical school. The new building will serve as the nerve center for educating future physicians, scientists, researchers and medical ethicists that will help shape the scientific and health care industries for generations to come. Moreover, the new Medical Education Building will be part of a biomedical sciences complex on Oakland University’s campus that will play a key role in Oakland County’s new Oakland Medical Initiative, a consortium that will make Oakland County a health care destination of choice for people across the county. As part of the new medical school, the Medical Education Building will help attract students and world-class faculty to a medical school that will have a tremendous economic impact on the state, in terms of both dollars and jobs created. 7/1/2009

Engineering Center

Rochester

Rochester

t i m

Biomedical Research Building

D VE

65,000,000 N/A

8/1/2012

$

125,000,000 N/A

The Engineering Center will provide instructional and research facilities for programs that enhance and support industries as diverse as defense, infrastructure, technology, computer science, manufacturing, transportation and many others. The Engineering Center will provide a central location for key instruction and research to be conducted by students and faculty, and will leverage its proximity to regional technology and R&D business to form partnerships that will help jumpstart Michigan’s economy. 7/1/2009

8/1/2012

$

74,000,000 N/A

The Biomedical Research Building will be a part of the new medical school, and will serve as the hub of research and laboratory activities for new medical students. Oakland University's Biomedical Research Building will be a critical addition to the Oakland University William Beaumont School of Medicine, providing a state-of-the-art facility with the most advanced technologies, laboratory capabilities and instructional settings for medical school and pre-med students to engage in basic, applied and translational research projects in the evaluation and discovery of promising new medical treatments and disease prevention. Studies conducted here will advance the body of medical knowledge and facilitate OU's commitment to taking research from bench to bedside. 7/1/2009

8/1/2012

$

100,000,000 N/A

Sept 10, 2010

$

T O

s t s

q e R

5/1/2012

Funding Request

Route (Infrastructure Only)

$

O R

P P A

-N

e u

d e tt

Expected Completion Date

b u S Schoolcraft College

Livonia, Michigan

02262009

Modernization and renovation of the Applied Science Building to create a teaching and learning environment that leverages the use of simulation technology in Nursing, Allied Health, STEM and GRIN courses and programs. The pervasive use of simulation technology will enhance skill development, critical thinking, and relevant situational response for our learners. The knowledge gained in this type of learning environmen will lead to a virtually seamless transition to future employment. The project would encompass approximately 16,000 square feet, 14 classrooms and labs, and include June 1, 2009 Biomedical Simulation Classrooms and Labs the purchase of cutting-edge simulation technology.

Submitted Requests - Not Approved

6,000,000

1039 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Southwestern Michigan College Dowagiac/LaGrange

Southwestern Michigan College Dowagiac/LaGrange

St. Clair County Community College

St. Clair County Community College

St. Clair County Community College

St. Clair County Community College

City - Port Huron

City - Port Huron

City - Port Huron

City - Port Huron

Project Name

City - Port Huron

02262009

Start Date

Student Residence Hall

Southwestern Michigan College made a strategic decision to build a student residence hall on its Dowagiac campus and construction began in 2008 and the hall will open in August of 2009. The service area that we serve has a large rural environment and as such Southwestern Michigan College is Title III eligible and approximately 42% of the students who come to SMC are deemed to be financially needy by federal definition. The College strongly feels that these students should have affordable access to a full college life experience. Since Southwestern Michigan College's tuition is approximately 40% of a four year college tuition, our residence hall allows this option to be affordable to many more students in our area. 90 Days

Campus Renovation

Southwestern Michigan College was founded in 1964 and a number of its buildings on its Dowagiac Campus were built in the 1960's. We have had an aggressive strategy of renovating existing buildings versus new construction during the past decade in order to minimize operating costs and to bring the buildings into ADA compliance, make them energy efficient and to bring facilities up to the high standards of our instructiona mission. 90 Days

Parking Lot Repair and Remediation

Improve water quality through storm water maintenance practices. Existing surface parking lots are in need of replacement per engineering study. The project will also address pedestrian and vehicle safety as well as campus building access concerns. The project includes walkways and landscape issues. Storm water runoff improvements will be incorporated into the project.

Main Building Repair

d e t

Technology Infrastructure Improvements

tt i m

Mackenzie Science Phase II Programming

Campus Deferred Maintenance

O R

Funding Request

$

24 months from start date.

$

19,600,000

5/11/2009

8/14/2009

$

2,000,000

Project addresses energy efficiencies through window replacement to reduce heat and cooling loss. The Main Building exterior brick and limestone are in significant disrepair and require considerable correction due to years of damage and corrosion. In addition, the windows are considered a failed component due to deterioration of weather seals. Replacement of windows would significantly enhance the energy efficiency of the building. This campus building is over 100 years old, designated as a historical marker and considered a community landmark. 5/11/2009

8/14/2009

$

1,000,000

Energy efficient technology infrastructure improvements and expanded bandwidth capacity. Reduce number of servers on campus through virtulization which will reduce the carbon footprint. Expanded bandwidth provides increased accessibility for students and potential for improved remote access (reducing travel for students). Improved data center cooling system for server racks. 5/1/2009

12/31/2009

$

850,000

Energy efficiencies through HVAC and lighting improvements. Improved ADA access (entrances, elevator) This is a continuation of a state-supported capital outlay project. Phase II adds additional updated science laboratories and science curriculum display space. HVAC, repurposing of academic space for science and additional deferred maintenance are also included in Phase II. 6/30/2009

5/1/2010

$

5,000,000

Campus has been installing green roofs to add plant life for air quality and reduce storm water runoff. Energy efficiencies in various campus lighting, HVAC, and replacement of components. The Applied Technology Center and Maintenance/Receiving Buildings are each in need of a new roof per engineering studies. The Main Building and Thiesen Building elevators required replacement cabs, pumps and motors to remain compliant with standards. The North Building and Mackenzie Science Building are in need of replacement flooring due to excessive wear and tear of flooring material that has exceeded its useful lifecycle. Project includes a roof stormwater/sewer runoff separation project to emphasize green concepts. 6/30/2009

7/1/2010

$

3,000,000

T O

s t s

-N

P P A

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

18 months from start date.

e u

b u S St. Clair County Community College

Project Description

Expected Completion Date

8,000,000 N/A

1040 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Clair County Community College

TechTown

City - Port Huron

Detroit

TechTown

Detroit

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Project Name

North Building Renovation

TechOne Business Incubator

Approximately 30,000 sq. ft. of existing space will be made ready for high technology businesses including additional car parking. The project is in a designated SmartZone that has been established by the MEDC. Prospective tenants have already signed term sheets and are ready to occupy space.

TechOne Business Incubator Land Improvement South Campus Duct to CSSB

Energy Conservation/Chiller Plants

Univ of MI Ann Arbor

Ann Arbor

Energy Conservation/Central Power Plant Upgrades

Univ of MI Ann Arbor

Ann Arbor

Brown G G Laboratory Renovations

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

02262009

T O

d e t

Medical Science Unit II Microbiology and Immunology Department Renovations Angell Hall Auditoriums Renovation of Auditorium A

tt i m

s t s

7,000,000

$

5,000,000

$

15,000,000

5/29/2009

$

700,000

3/5/2009

6/24/2009

$

315,825

5/4/2009

6/26/2009

$

575,000

5/11/2009

6/26/2009

$

400,000

-N

7/9/2009

Jul-11

$

110,000,000

New regional chiller plants, replacements and interconnects - NC Regional Chiller Plant, Chemistry Regional Plant, multiple chiller replacements, and Palmer/Fletcher Chiller interconnect.

7/9/2009

Jul-11

$

40,000,000

Central power plant upgrade - gas turbine/waste heat BIR upgrade and steam path upgrades - steam path upgrades and CPP steam turbine replacement

7/9/2009

Jul-11

$

25,000,000

Renovation for nanotube synthesis lab.

2/19/2009

7/17/2009

$

316,000

7/29/2009

$

1,600,000

7/31/2009

$

850,000

8/7/2009

$

900,000

8/7/2009

$

400,000

Aug-10

$

3,000,000

8/14/2009

$

2,100,000

e u

q e R

Renovate approximately 10,320 gsf. into new lab space, primarily on the 6th level . There are approximately 5 separate construction phases to this project. Three cold rooms need to be completed in an expedited manner as a phase one. 3/1/2009 Replace existing seating. finishes, lighting, acoustical panels, a/v, remodel projection room, lower stage and add a ramp for ADA compliance. 5/4/2009

Angell James B Hall Renovate 1st Floor areas Renovate rooms 1012, 1014, 1021, 1023, 1024, 1026, 1028, 1029A, 1029B, 1029C, of Tisch Hall 1029D, 1029F, 1029G, 1029H, 1029J, 1029K, 1029L, 1029M and 1030. 5/4/2009 Chrysler Center Continuing Office Room 153 will be divided into 4 individual offices, 1 equipment room, 1 common Renovations space and 1 small conference room. 5/4/2009 Solar collectors, wind turbines, lighting upgrades - solar collectors at CPP and for Renewable Energy NC/CC pool heating. 7/9/2009

East Quadrangle Residential College Auditorium Renewal

O R

Project combines Phase 1 - exterior and lobby renovations with Phase 2 - Auditorium upgrades which includes interior finish upgrades, mechanical system upgrades, creation of a second egress, installation of VPL, loading dock and backstage improvements. 4/10/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

2/16/2009

ub

S

12/31/2010

Funding Request

P P A

Second building, in good repair, that could be renovated and made tenant-ready within 180 days. This building will provide an additional 140,000 sq. ft. of space for high technology companies within the research park. Estimate that a minimum of 350 high technology jobs would be created by companies who would occupy the space.

Extending existing underground duct bank to be used for 15 kV primary distribution. Renovate the Electronic Music Studio located within the James and Anne Duderstadt Duderstadt, James and Anne Center Center. Land Improvement Water Main Replacement - Replace existing 8" watermain along Hayward from Murfin to Draper and Beal AveHayward and Beal Hayward to Fire Station. Land Improvement Matthaei Botanical Gardens Site Improvements Asphalt paving and drainage improvements for roadway and parking lot. Renovation and addition to provide facilities for research in areas such as bio and Mechanical Engineering nano-technologies, hydrogent energy systems and bio-systems.

Ann Arbor

Ann Arbor

Start Date

Energy efficiency improvements in HVAC and lighting. Improved ADA access (entrances, elevators) The renovation of the North Building to a Center for Health and Human Services will accommodate a growing demand for health-focused career and technical training in the areas of medical/clinical lab technicians, physical therapy assistants, occupational therapist assistants, and medical assistants and will correct deficiencies in building infrastructure systems. 7/27/2009

Univ of MI Ann Arbor

Univ of MI Ann Arbor

Project Description

Expected Completion Date

1041 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Univ of MI Ann Arbor

Ann Arbor

Lane Hall Remodel Ground Floor for Computer and Office Use.

Provide architectural, mechanical and electrical improvements to reconfgure existing administrative and computer spaces on the ground floor. 5/4/2009

8/14/2009

Univ of MI Ann Arbor

Ann Arbor

Campus Safety Services Building Connect CSSB to 13.2 kV University Power Grid

Project scope includes extending the 13.2 kV as required, adding a substation, and removing the existing Detroit Edison pad-mounted transformer.

8/21/2009

Univ of MI Ann Arbor

Ann Arbor

Dow Herbert H Building HVAC upgrades

Add supplemental cooling to SF2. Modify FHE fans, controls and associated make-up air to reduce load on SF1, which is currently operating beyond capacity. 4/27/2009

North Campus Switch Station NC Switching Station Transformer Upgrades

To accommodate increased load, the primary cables would have to be replaced by 750MCM cable from the cable pole to the branch joint where the single cable splits to serve two transformers. This would increase the available capacity to the sub station to 32.2mva. 6/8/2009

Univ of MI Ann Arbor

Ann Arbor

4/1/2009

600,000

D VE

780,000

$

400,000

9/30/2009

$

3,800,000

10/16/2009

$

1,200,000

6/1/2009

11/2/2009

$

593,000

7/9/2009

Nov-10

$

11,000,000

4/2/2009

Ann Arbor

Environmental & Water Res Eng Bl Ground Floor Laboratories for Civil Engineering

Univ of MI Ann Arbor

Ann Arbor

Environmental & Water Res Eng Bldg

Renovate approximately 2000 SF of existing lab and office space.

Univ of MI Ann Arbor

Ann Arbor

Roof Replacements

Priority roof replacements - 15 projects

Univ of MI Ann Arbor

Ann Arbor

Tunnels Brick Tunnel Replacement (800-804) Replace tunnel and piping (near Kraus and Chemistry).

9/30/2009

O R

P P A

Univ of MI Ann Arbor

-N

$

$

Subdivide and remodel approximately 2,000 gsf of existing laboratories into 3 wet laboratories for new researchers. Fitout includes casework, four new chemical hoods, and equipment power and services. 4/24/2009

T O

Funding Request

11/20/2009

$

4,100,000

Replace piping and tunnel structures. Project is divided into two components in Capita Reserve Plan: "Lorch Hall Tunnel Structure and Piping Replacement", and "SEB Crawl Tunnel Replacement Including Piping". 5/22/2009

11/28/2009

$

1,100,000

Replace the storefront entrance systems in 4 locations of the B Wing.

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Tunnel Structure and Piping Replacement (716-717) Dental And W K Kellogg Institute Replace B Clinic Wing Entrances

11/30/2009

$

360,000

Univ of MI Ann Arbor

Ann Arbor

Replace main air handling unit. Study planning phase: investigate unit, CHW system Naval Arch & Marine Engineering Replace Air from NCCP, steam generation and distribution in the area and develop Handling Unit comprehensive recommendation for replacement of this AHU. 6/22/2009

12/4/2009

$

250,000

Univ of MI Ann Arbor

Ann Arbor

Molecular & Behavioral Neuroscience Institute Provide renovation for approximately 3,000 gsf. on the 1st level of MBNI. Scope First Level Lab Renovation includes converting administrative and support areas into a new wet lab environment. 5/28/2009

2/19/2010

$

1,600,000

Univ of MI Ann Arbor

Ann Arbor

Ruthven Alexander G Museums

Univ of MI Ann Arbor

Univ of MI Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

Univ of MI Ann Arbor

Ann Arbor

02262009

q e R

3/31/2010

$

1,500,000

Bagnoud Francois-Xavier Building

4/30/2010

$

5,300,000

Dow Herbert H Building MBE Laboratory Renovation

Renovate approximately 3,000 gsf on the 2nd level of to accommodate MBE research laboratory. Provide all architectural, mechanical and electrical work necessary to accomplish these improvements. 5/27/2009

5/26/2010

$

2,810,000

4/20/2009

6/18/2010

$

8,500,000

7/9/2009

7/10/2010

$

15,000,000

8/26/2010

$

4,800,000

t i m

Ann Arbor

e u

Replace three traction elevators.

ub

S

6/1/2009

Provide an Ultra-Low Vibration Research Laboratory to accommodate the Mechanical Engineering Department’s Bio-Engineering and Bio-Nanotechnology research endeavors. Approximately 6,700 gross square feet of area is proposed as part of this project. 5/1/2009

d e tt

Ann Arbor

s t s

Demolish the Kresge Complex of facilities. Buildings include Kresge Medical Research Building 1, 2, and 3; Kresge Hearing Research Institute, Kresge Animal Multiple Buildings Kresge Complex Demolition Research Facility, the Upjohn Center, and A.C. Lloyd Memorial Laboratory Business engagement center; Lab renovations for new growth in engineering and Renovations for Growth medical research.

Engineering Programs Building

2/16/2009

Design and development of the expansion of the Engineering Programs Building by approximately 6800 gsf. Project location and scope to be similar to the Wilson Team Center Study. 7/24/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

1042 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Univ of MI Ann Arbor

Ann Arbor

Project Name

Project Description

Start Date

Thompson St Parking Structure Addition

The addition to the Thompson Street Parking Structure is an integral part of the University's Parking and Transportation strategic plan to provide parking for anticipated incremental growth in demand, and to replace parking lost on central campus due to various construction projects. The project involves a 385-space parking structure addition, and 9,000 gross square feet of office and support space for the departments of Parking and Transportation Services and the Office of Budget and Planning. When the addition is complete, the entire parking structure will accommodate approximately 1,060 vehicles, for a net increase of 284 parking spaces. 3/25/2009

Univ of MI Ann Arbor

Ann Arbor

Law School Academic Building New Law School Academic Building

The proposed project includes a new academic building located south of Monroe Street, an addition between Hutchins Hall and the William W. Cook Legal Research Library for a new Law School commons, and renovations within both Hutchins Hall an the Cook Library. The new academic building will be approximately 100,000 gross square feet that will house classrooms, multi-purpose spaces, clinic work spaces, and offices. The commons project of approx. 16,000 gsf will provide needed student study, interaction, and support spaces. Additionally, the project will include life safety upgrades to Hutchins Hall and the Cook Library and the addition of an electrical substation and chilled water plant. The project will also replace the metal siding on the connection between the Law Quad buildings and the Cook Library stacks wing with a masonry façade. 5/4/2009

Univ of MI Ann Arbor

Ann Arbor

Animal Research Facility

Infrastructure upgrade for research activities.

s t s

Expected Completion Date

T O

-N

O R 9/27/2010

Funding Request

Route (Infrastructure Only)

D VE $

15,700,000

6/30/2011

$

102,000,000

7/11/2011

$

1,400,000

11/18/2011

$

9,475,000

7/1/2009

$

400,000

11/30/2009

$

850,000

P P A 7/15/2009

Constructed in 1971, the Thomas Francis, Jr., Public Health Building is a nine-story, approximately 172,000 gross square foot facility housing classrooms, laboratories, offices, and support spaces for the School of Public Health. The electrical needs in the building have grown to exceed the available capacity, and many of the finishes are in need of renewal to update the interior of the building. The proposed infrastructure project will upgrade the building’s electrical system to provide additional power for computers in faculty and staff offices, and upgrade the emergency power system to meet current codes and standards. Architectural finish updates will include painting offices and corridors and replacing the furniture in classrooms, faculty and staff offices and support spaces. The scope of this project includes the architectural, mechanical and electrical work necessary to accomplish these improvements. 3/16/2009 HFE Heating - Power House: Replacement of steam radiators and steam boiler serving the power house. Immediately

e u

Univ of MI Ann Arbor Ann Arbor University of Michigan- 4903 Evergreen Road, Dearborn Dearborn, MI

Francis Thomas Jr Public Health Infrastructure and Finishes Renewal

Henry Ford Estate HVAC replacement

tt i m

b u S

University of Michigan- 4905 Evergreen Road, Dearborn Dearborn, MI

02262009

d e t

Evergreen Road Landscape Improvements

q e R

More than one mile of the campus frontage is along a main thoroughfare in the City of Dearborn. This landscape was an unforeseen consequence of development along the border, of what was once, a French ribbon farm. Design and construction documents are complete for a six phase project which eliminates the invasive species, and maintains its nature as a limited urban wildlife food source and corridor. The design uses native species that thrive in these soil conditions and has the added advantage of being very low maintenance, requiring little manicured lawn or irrigation. Two phases of this project were completed in 2007 and 2008 and have proven successful, not only in appearance, which reflects the historic design of the campus' Henry Ford Estate, but also in the environmental advantage. Immediately

Submitted Requests - Not Approved

1043 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

University of Michigan- 4904 Evergreen Road, Dearborn Dearborn, MI

University of Michigan- 4903 Evergreen Road, Dearborn Dearborn, MI

Project Name

Project Description

Start Date

IT Hub Network Relocation

The Campus IT Hub is located in the Computing Wing of the Science Building and was constructed nearly twenty years ago. With the impact of new technologies the IT Network Hub requires expansion in order to serve the campus population and its functions. At the same time, we have experienced growth in science enrollment and programs and space is at a premium in this location. We developed design and construction documents that will allow us to relocate this function to a more suitable building with potential space for expansion. Immediately

Energy Conservation

The University completed an analysis of its facilities in 2004 and identified significant energy savings projects. While we have pursued several of these over the last few years, we have identified additional energy conservation work to complete including replacement of window and door systems, lighting upgrades and occupancy sensors. Design and construction documents are complete on the first phase of this project. Immediately

UM-Dearborn Arts Center

In 2008, the University completed a feasibility study for the development of our existing Berkowitz Art Gallery program into a more expansive and diverse University Arts Center. This study evaluated the reuse of exiting space, recommended potential configurations, and much needed infrastructure improvements to accommodate the expanding performing arts program and fine arts collections. This feasibility study includes an evaluation of the existing facility and infrastructure conditions, code review and cost analysis. We concluded that the currently vacant Recreation Organization Center is well suited to this purpose and can be adapted to create conditioned and secure gallery spaces and a small performance theatre. This very detailed feasibility study will enable us to easily proceed with design and construction document phase, and we are confident that this project will be constructed within the two year time frame and provide a benefit to the University community and the surrounding area. Immediately

Roof Replacement

Roof replacement is another item on our deferred maintenance list that will also improve energy conservation. The roofing systems of these three buildings are all more than twenty years old and reaching their end of life.

University of Michigan- 4906 Evergreen Road, Dearborn Dearborn, MI

University of Michigan- 4907 Evergreen Road, Dearborn Dearborn, MI University of Michigan- 4908 Evergreen Road, Dearborn Dearborn, MI University of Michigan- 4909 Evergreen Road, Dearborn Dearborn, MI

8/30/2010

$

1,300,000

1/20/2011

$

5,000,000

3/30/2009

2/1/2011

$

700,000

Installation of Fire Detection/Suppression & Security Systems in the Henry Ford Estate residence. Work includes fire suppression piping system header, branch lines, and sprinkler heads in all areas of the residence. In addition, a security system will also be installed in the residence and powerhouse. 3/30/2009

2/1/2011

$

700,000

Internal campus roadways are in need of repair and we plan to reconfigure the intersection at the primary entry in order to improve vehicle and pedestrian safety, traffic flow, and walkability.

3/30/2009

2/1/2011

$

Parking Structure Renovation

A thorough assessment and preliminary design were completed in 2007, which recommend significant improvements in order to maintain the structural integrity of this parking structure.

3/30/2009

2/1/2011

$

600,000

PEC Fire Safety Enhancements

The Professional Education Center has the potential of serving as an excellent classroom building with some modifications to meet fire safety code standards for that occupancy classification. 3/30/2009

2/1/2011

$

200,000

Administration Building Renovation

The needs of three of the administrative departments housed in the Administration Building have changed dramatically. Preliminary Design documents were completed in 2007 to complete the renovations that will allow us to maximize the utilization of our existing space. This renovation will also improve daylighting to office workspace and reduce energy consumption. 3/30/2009

2/1/2011

$

1,200,000

CASL Annex Demolition

itt

d e t

Road Improvement Project

S

University of Michigan- 4911 Evergreen Road, Dearborn Dearborn, MI

02262009

t s e

e R

PP

O R

Route (Infrastructure Only)

O N

qu

m b u

University of Michigan- 4910 Evergreen Road, Dearborn Dearborn, MI

D VE

635,000

s

1/30/2010

Funding Request

$

A T

University of Michigan- 4902 Evergreen Road, Dearborn Dearborn, MI

Expected Completion Date

Submitted Requests - Not Approved

Internal Campus 1,000,000 Roadways

1044 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

University of Michigan- 4912 Evergreen Road, Dearborn Dearborn, MI

Project Name

Project Description

Start Date

Dearborn Pedestrian Walkway

With the acquisition of the Ford Training and Development Center on Hubbard Drive, UM-D's School of Management and School of Education are separated from the main campus. The University of Michigan-Dearborn has been working with Wayne County, The City of Dearborn, Henry Ford Community College and a consulting firm, to create a safe and walkable passage between the Evergreen Road Campus, the Fairlane Center, the Henry Ford Community College, and local shopping and food service venues. The nearly completed study identifies a feasible and safest route for pedestrian crossings on Evergreen Road and Hubbard Drive. The distance between these destinations falls well within a maximum distance of travel identified as a walkable community, but safe passage is needed to cross heavily traveled roadways. Walkable communities contribute to individual health, reduce air and noise pollution, increase affordability and reduce storm water contamination. 3/30/2009

University of Michigan- 4906 Evergreen Road, Dearborn Dearborn, MI

Evergreen Rd. to 350,000 Hubbard Dr.

Science/CIS Building Renovation

The University of Michigan-Dearborn’s Science Building and Computer Information Sciences are housed in two of the original buildings completed on campus in 1959. The Department of Natural Sciences has been growing steadily over the past five years, and in 2001 it instituted a master’s degree program in environmental science. The growth in biological sciences has been particularly steep, with enrollment more than doubling over the past five years. Teaching and research methodologies have dramatically changed along with the internet and new technologies and the building is in need of complete renovation in order to accommodate the academic program and student enrollment. The CIS building requires mechanical and electrical infrastructure improvements in order to host more advanced computer science laboratories and provide an isolated network environment that will allow faculty and students to conduc research on viruses and other security issues connected to networks in a safe environment. Immediately

1/20/2012

$

41,000,000

Henry Ford Estate Power Upgrade and Fire suppression

Power Upgrade - Power House: Replacement of underground/overhead primary electrical services, cable and gear, from primary switch cabinet located behind Field House to Power House along with replacement of selective power/lighting panels and their respective branch circuits in this building. We propose to add a wet pipe fire suppression system and detection alarm to this historic structure. 3/1/2009

2/30/2010

$

1,200,000

12 months from bid award date

$

5,000,000 N/A

N s

t s e

u q e

R d

b u S 02262009

D VE $

e t tt

i m

University of MichiganFlint Flint, Michigan

P P A

O R

Funding Request

Route (Infrastructure Only)

2/1/2011

T O

University of Michigan- 4901 Evergreen Road, Dearborn Dearborn, MI

Expected Completion Date

This project includes the replacement of 30 year old "energy hog" boilers as well as improvements to the CEP cooling system. Preliminary recommendation suggests that the CEP will require two new high efficiency boilers. These boilers would be sized to meet current and future campus enrollment growth projections to 8,000 students (including residential) and beyond. It is anticipated that the replacement boilers will be a minimum of 15% more energy efficient and yearly boiler utility and maintenance cos will also be reduced. Additionally, modifications to the steam delivery and exhaust systems will be required which will provide additional electrical energy savings. Chillers are also part of the CEP infrastructure improvement project. In order to accommodate any additional cooling loads the chillers will require a larger cooling tower and new variable frequency drive units. We expect the energy savings from the chiller system upgrades to be at least 10%.

Central Energy Plant (CEP) Infrastructure and Energy Efficiency Improvement Project

TBD

Submitted Requests - Not Approved

1045 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

University of MichiganFlint Flint, Michigan

Project Name

Project Description

Start Date

Energy Efficient Outdoor Campus Lighting Project

We have met with lighting engineering design firms to identify a comprehensive campus-wide outdoor lighting plan. The first phase of that plan will be to replace or upgrade several areas of the campus that have been identified as having light levels significantly below university standards. The design of the first phase of the plan is now in process and is schedule to be completed on February 6, 2009. The lighting system selected will feature energy efficient LED technology and will have lamps that last 100,000 hours resulting in savings by avoiding the maintenance and material costs associated with frequently changing burned out lamps. The new LED lighting system will save a minimum of 20% for electrical usage and 80% in replacement lamp costs and labor to install replacement lamps. Not only will savings be realized with regard to utility and labor costs, but will reduce the amount of environmental waste generated by used bulbs and ballasts. TBD

Campus Roof Replacements With Focus on Energy Efficienct Enhancements

PP

O R

Funding Request

$

4,000,000

Many of our campus classroom buildings have aging roof systems, 20 – 30 years old and need to be replaced. These buildings provide essential classrooms, labs, recreational, and electrical mechanical services to the campus and include the Murchie Science Center, University Center, Central Energy Plant and the Recreation Center to name a few. Facilities Management has awarded a bid to Tremco, a roofing engineering firm, in order to obtain critical information on roof conditions for each building and best possible replacement method. Our goal is not only roof replacement but to explore alternatives which may provide increased energy efficiency while maintaining structural integrity. For all roof replacements, sustainability will be seriously considered in material selection. By using increased insulation R values and membrane reflectivity we look to reduce heat loss and cooling load through the roof by approximately 20%. We would also intend to explore the ability to recycle both the old and new roofing materials. Since the engineering study is about to begin, (weather permitting) this project could begin within the next few months. The major concern on TBD

9-15 months from bid award date

$

3,000,000

Campus Parking Decks/Lots Infrastructure Project Including Energy Efficient Lighting

Facilities Management has been working with Walker Parking Consultants for the past several years and has an updated structural analysis’s of our decks and flat lots. The decks, Mill, University Pavilion (one –third), Harrison, Northbank Center, are all in excess of twenty years old and need concrete repair, beam replacement, tendon repair, upgrades to lighting and fire protection systems, top coating and sealants and paint. This includes the removal of the existing unusable Harrison Deck spiral. Also, in a recent campus lighting survey the Harrison Deck and the University Pavilion Deck were identified as areas which should be targeted for a lighting project with LED fixtures since these ramps have original fixtures which are not energy efficient and are high maintenance. The flat lots are also in need of re-paving and sealants, especially Lot A. In maintaining current lots and ramps the University is demonstrating wise use of existing capital and resources. The ramps would benefit from re-lamping with high efficiency LED lighting. Collectively, NBC, Harrison, and UPAV would see minimally a 20% electrical load reduction by replacement of existing lighting. TBD

9-15 months from bid award date

$

3,000,000

Athletic Field Expansion and Restoration

This project would expand our students' outdoor recreational opportunities on campus which are presently extremely limited. Sustainable design concepts will be utilized throughout including bioswales, pervious paving, and native planting, reuse of storm water runoff, reduction of heat island effect, and LED site lighting, 5/1/2009

9/1/2009

$

2,600,000

Campus Water Main Extension

This project will provide the College with a reliable water feed to the main campus. Presently our current water main is 40 years old and frequently breaks, which causes the College to close. A new water main, along with a redundant water feed, will provide the College with a much more reliable water source. 6/1/2009

9/1/2009

$

500,000

s

t s e

Route (Infrastructure Only)

D VE

6-9 months from bid award date

A T

University of MichiganFlint Flint, Michigan

Expected Completion Date

O N

u q e

R d

University of MichiganFlint Flint, Michigan

Washtenaw Community College

Washtenaw Community College

Ann Arbor

Ann Arbor

02262009

e t tt

i m

b u S

Submitted Requests - Not Approved

1046 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Washtenaw Community College

Project Name

Project Description

Start Date

Expected Completion Date

This project will replace the domestic water pipes in the building which are made from galvanized metal. These 30 year old pipes have begun to fail and leak all over the Student Center Building Domestic Water Pipe building. We will replace all the galvanized pipes with copper which is a much more Replacement reliable material. 8/1/2009

Ann Arbor

1/2/2010

Funding Request

$

350,000

$

1,750,000

5/1/2010

$

1,800,000

8/1/2009

7/1/2010

$

3,500,000

8/1/2009

8/1/2010

$

13,500,000

5/1/2009

10/1/2009

$

3,800,000

5/1/2009

10/1/2009

$

1,500,000

5/1/2009

10/1/2009

$

400,000

East Parking Lot Lighting Upgrade

6/1/2009

10/1/2009

$

250,000

New Green Roof

5/1/2009

10/1/2009

$

250,000

Academic Administration Building New Green Roof

5/1/2009

10/1/2009

$

200,000

Northwest Campus

Welcome Center Upgrade Lighting, Electrical System

6/1/2009

12/1/2009

$

3,200,000

Northwest Campus

General Arts Building Upgrade Lighting, Electrical System

6/1/2009

12/1/2009

$

1,800,000

D VE

Campus Thermal Storage Chilled Water Upgrade

The project will significantly increase the College's chilled water capacity without adding a new chiller or additional ozone depleting refrigerating agents into the atmosphere. By installing a thermal storage chilled water system we add much needed cooling capacity without adding these refrigerants.

Crane Liberal Arts and Science Building Electrical Systems Upgrades

This project will replace existing electrical service equipment which is almost 40 years old and functionally obsolete. It would replace transformers, switchgear, and motors which are no longer in production and beyond their useful life cycle. The equipment would be replaced with the highest efficiency and energy conserving emerging technologies currently available. 8/1/2009

Ann Arbor

Culinary Arts Program Renovations

This project would provide new and expanded lab space and equipment for our emerging Culinary Arts program. The program is current housed in cramped inadequate lab space that is more than 30 years old with outdated instructional technology and equipment.

Washtenaw Community College

Ann Arbor

This project will update the building's 30 year old infrastructure, provide a green vegetation roof, include geothermal heating and cooling, general classroom Occupational Education Building Renovations remodeling and include new labs for emerging sustainable design technologies.

Wayne County Community College District

Taylor

Downriver Campus

New Green Roof and Skylight Upgrade

Wayne County Community College District

Detroit

Downtown Campus

New Green Roof

Wayne County Community College District

Detroit

Northwest Campus

Laboratory Science Building New Green Roof and Skylight Upgrade

Wayne County Community College District

Taylor

Downriver Campus

Wayne County Community College District

Detroit

Administration Building

Wayne County Community College District

Detroit

Northwest Campus

Wayne County Community College District

Detroit

Wayne County Community College District

Detroit

Wayne County Community College District

Taylor

Downriver Campus

Upgrade Boilers, Chillers, new DDC System, or Geothermal

6/1/2009

12/1/2009

$

1,500,000

Wayne County Community College District

Detroit

Eastern Campus

Upgrade Boilers, Chillers, new DDC System, or Geothermal

6/1/2009

12/1/2009

$

1,500,000

Washtenaw Community College

Washtenaw Community College

Washtenaw Community College

Ann Arbor

Ann Arbor

02262009

S

s t s

-N

e u

eq

R d

e t t

t i m

ub

T O

Submitted Requests - Not Approved

O R

7/1/2009

P P A

4/1/2010

Route (Infrastructure Only)

1047 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Wayne County Community College District

Taylor

Downriver Campus

East Parking Lot Upgrade to Pervious Pavement

6/1/2009

12/1/2009

Wayne County Community College District

Detroit

Downtown Campus

Upgrade Cooling Tower, New DDC System

6/1/2009

12/1/2009

Wayne County Community College District

Detroit

Eastern Campus

Upgrade Lighting, Electrical System

6/1/2009

12/1/2009

Wayne County Community College District

Belleville

Western Campus

New DDC System, Non-Renovated Mechanical Equipment Upgrade

6/1/2009

Wayne County Community College District

Detroit

Administration Building

Upgrade Chiller, New DDC System

Wayne County Community College District

Belleville

Western Campus

UpgradeNon-Renovated Area Lighting, Electrical System

Wayne County Community College District

Detroit

Northwest Campus

Wayne County Community College District

Detroit

Funding Request

$

750,000

D VE $

600,000

$

600,000

P P A

12/1/2009

$

450,000

6/1/2009

12/1/2009

$

400,000

6/1/2009

12/1/2009

$

350,000

Laboratory Science Building Upgrade Lighting, Electrical System

6/1/2009

12/1/2009

$

100,000

Administration Building

Façade Upgrade, Solar Photovoltaic Panels

8/1/2009

8/1/2010

$

2,700,000

MULTI-DISCIPLINARY BIOMEDICAL RESEARCH BUILDING

To expand research capacity in new fields of nanomedicine and nano biosciences, and to support NIH initiatives in translational research, Wayne State University plans to construct the proposed 300,000 square foot building on its medical campus in Detroit. The project will provide laboratory / research facilities for up to 700 new principal investigators and staff focused on the rapid transfer of health care and disease prevention discoveries to bedside practice. Specific initiatives will include an advanced imaging center performing research on traumatic brain injury as well as amyotrophic lateral sclerosis (ALS), and other neurological diseases. These research initiatives will be in collaboration with the Veterans Administration Hospital. With this facility the university expects to increase its research productivity by an additional $200 million annually. August, 2009

September, 2011

$

Constructed in 1970, the five-story Chemistry Building provides 218,500 square feet of capacity to the College of Liberal Arts and Science's Chemistry Department; one of the university's most productive research departments. In 2005 the university completed the renovation of the north half of the building at a cost of $25.0 million. The new research laboratory facilities contributed significantly to the Chemistry Departments success in recruiting new highly talented research faculty and graduate Master and PhD candidates, many of whom are minority or historically disadvantaged to their programs. The proposed project will renovate the south half of the Chemistry Building, completing its renewal and modernization. Research programs in chemistry, bio-chemistry and chemical engineering will benefit from this investment. A previous outcome from department research faculty is the invention chemiluminescent medical diagnostic materials. Its inventor and former faculty member has recently donated $7.0 million toward construction to expand the Chemistry Building. Coupled with the proposed south half renovation, the fully renovated Chemistry Building will provide res June, 2009

September, 2010

$

T O

N s

O R

Route (Infrastructure Only)

t s e

Wayne State University Priority No. 1 Detroit, Michigan

R d

e t t

t i m

b u S

Wayne State University Priority No. 2 Detroit, Michigan

02262009

u q e

CHEMISTRY BUILDING RENOVATION

Submitted Requests - Not Approved

180,000,000 I-75 and Warren

30,000,000 M-10 and Warren

1048 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Wayne State University Priority No. Clinton Township, 3 Michigan

Wayne State University Priority No. 4 Detroit, Michigan

Project Name

Project Description

Start Date

Expected Completion Date

WAYNE STATE UNIVERSITY MACOMB COUNTY EXTENSION CENTER

To expand its educational outreach and provide Michigan's Macomb County residence with a four year college opportunity, Wayne State University plans to lease the Macomb County Public Library and convert at least 70 percent of the building into classroom and instructional space. In cooperation with Macomb County Community College, Wayne State now offers four year Bachelor Degree programs in several engineering and information technology disciplines. Providing Macomb County citizens with these retooling / educational opportunities has become acutely important due to the dramatic unemployment problems being experienced in Southeast Michigan. The proposed project will provide access to reference and research materials through Wayne State University. Converting existing library space to classrooms will provide local four year degree options to an anticipated 1200 students annually. May, 2009

STATE HALL RENOVATION

Constructed in 1948 with State funds and expanded in 1957, State Hall is the university's third largest classroom building with 163,500 square feet. This building is approaching the end of its useful life. Recent building condition evaluations have defined deferred maintenance problems that exceed $14.7 million indicating that slightly more than fifty percent of the building is overdue for renewal. Most of the backlog exists in mechanical and electrical systems and the building envelope. This project proposes extensive renovations to enable State Hall's continued support of general academic programs and courses. This renovation is key, in this highly competitive market, to continue to increase enrollment and better equip students to contribute to the economic success of the State. August, 2009

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

December, 2009

$

December, 2010

$

40,000,000 M-10 and Warren

Having recently completed the development of a 5-Year Strategic Energy Plan that addresses procurement, production and consumption of energy at Wayne State, many energy conservation measures must be implemented to reduce our carbon footprint by as much as 25% during the next ten years. An inventory of individual project investment opportunities has been compiled to reduce consumption of electricity, natural gas, steam and water across campus. Specific project types include lighting retrofits and delamping, occupancy sensor installations, high-efficiency motor installations, chiller plant upgrades, expanded use of building automation controls, adapting HVAC distribution systems to VAV and VFD control technology, and recommissioning buildings to as new condition. The proposed projects are expected to yield an average payback of five years, with some as low as two years. Several individual projects can begin implementation within 60 days of funding. Others will take up to two years to complete due to design and equipment manufacturing lead time. May, 2009

June, 2011

$

10,000,000 M-10, I-94

The university's current exclusive reliance on fossil fuels must change. The proposed project will introduce solar and wind electricity generation to demonstrate viability and potential cost saving magnitudes. The Undergraduate Library will be equipped with an array of solar voltaic panels to convert solar energy to electric energy that will power the buildings interior lighting systems. A wind turbine will be used to generate all electricity needed to support the 30,000 square foot General Lectures Building. June, 2009

July, 2010

$

5,000,000 M-10, I-94

September, 2011

$

T O

N s

3,200,000 1-94 and M-59

t s e

u q e

Wayne State University Priority No. 5 Detroit, Michigan

R d

e t tt

ENERGY CONSERVATION INITIATIVES

i m

b u S

Wayne State University Priority No. 6 Detroit, Michigan

ALTERNATIVE ENERGY DEPLOYMENT DEMONSTRATION

Wayne State University Priority No. 7 Detroit, Michigan

The Interdisciplinary Science Reseach Building will support the research initiatives of diverse disciplines focused on the life sciences. The facility will contain wet laboratories and support spaces designed to promote collaborative scientific INTERDISCIPLINARY SCIENCE RESEARCH investigations, thus contributing to the further diversification of Michigan's workforce and economy. August, 2009 BUILDING

02262009

Submitted Requests - Not Approved

71,000,000 M-10 and Warren

1049 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Western Michigan University

Western Michigan University

Western Michigan University

Western Michigan University

Project Description

Start Date

Victory Township, Mason County Energy Project

The location of the Multi-disciplinary Biomedical Research Building (MBRB), noted above as Wayne State No. 1 priority, will force the displacement of a surface parking lot that accomodates approximately 500 vehicles. The proposed Medical School Parking Structure will essential replace the surface parking lot and provide capacity for the 700 new jobs created by the MBRB. May, 2009 The Energy Project includes upgrading or replacing energy components in four major campus buildings; The Administrative & Conference Building, and The Technical Center, The Arts & Sciences Center and The Recreation Center buildings, which were built between 1969 to 1976. 1. Roofing energy upgrades include installing a highly reflective roofing membrane or green roof, roof and wall insulation in accordance with current energy standards. Many orginal roofs have minimal or no insulation. 2. HVAC Systems energy upgrades include replacing original HVAC Systems in order to maximize comfort, minimize installed costs, and minimize operating costs. The HVAC systems will meet the control and energy consumptions requirements of current energy standards and demand controlled ventilation to insure adequate indoor air quality while reducing the amount of outdoor air required for energy efficiency. The 4. Exterior Doors & Exterior Glazing are also generally original to the buildings. DoorsSummer 2009

Kalamazoo

Wayne State University Priority No. 8 Detroit, Michigan

West Shore Community College

Project Name

Kalamazoo

Kalamazoo

Medical School Parking Structure

T O

June, 2010

P P A

O R

Funding Request

D VE $

20,000,000 M-10 and Warren

$

Sangren Hall Part II

Renovation of Sangren Hall (part two not included in current project approved for planning). Infrastructure will be upgraded to support the completely renovated building. Sangren will be renovated to house over 2000 students at any one time in state of the art classrooms. Majority of WMU students utililize this building and 80% of our graduates locate in the state of Michigan. Work required but not typically included As soon as in a State Capital Outlay project will be done to support the renovated building. authorized.

20 Months

$

71,600,000 NA

Business Technology and Research Park Phase II

Expand the very successful Business Technology and Research Park. Infrastructure will be added to support additional building sites and an addition will be added to the Collge of Engineering building to house collaborative efforts between industry and University. This project would provide the facilities for companies such as Stryker Corporation to partner with Western Michigan University in advancing research, As soon as development, and marketable products. authorized.

24 Months

$

60,000,000 NA

As soon as authorized.

24 Months so as not to displace students.

$

60,000,000 NA

A new and/or renovated building will house student activities, organizations, staff, and supporting services. Students have consistantly continued to request such as facilty. As soon as Infrastructure will be upgraded to support the facility. authorized.

24 to 30 Months

$

75,000,000 NA

New and renovated facilities to house flight operations and training, maintanence operations and training, student activities and support spaces, and faculty/staff offices These facilites will provide state of the art spaces for the next twenty years as the As soon as College of Aviation expands and enhances the academic program. authorized.

48 Months so as to minimize disruption to the college. $

70,000,000 NA

N s

bm

t s e

u q e

R d

e t t

it

Student Union

Battle Creek

Atlas Township

Atlas Township. Genesee County Internet Service for Township Residents

Provide Internet service to those township residences that are currently unserved. Project would entail installing wireless antennas on individual homes as well as relay antennas on several tall building or tower locations already existing in the township. July 1,2009

July, 2010

$

250,000

Casco Township

74th Street Water Main Extension from the Casco Township, Allegan North dead end of 74th Street to Beverly Shores Subdivision County

Placement of 600 lf of 12" Water main to connect and loop existing Water Mains and create redundancy in the water system for this portion of the Township. 4/1/2009

6/1/2009

$

65,000

02262009

College of Aviation Campus Expansion and Enhancement

Renovation of existing residence halls on campus. Space to house 1300 students would be renovated to current market standards and meet all life safety codes. Infrastructure will be upgraded to support the renovated halls.

2,552,000

Western Michigan University

u S

Route (Infrastructure Only)

Summer 2011

Student Housing Renovation

Kalamazoo

Expected Completion Date

Submitted Requests - Not Approved

1050 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Casco Township

Casco Township, Allegan Miami Park Water Main Extension from County Highfield Beach Club to The Bluffs

Casco Township

Casco Township, Allegan Miami Park Sanitary Sewer Extension from Place 3,800 lf of 8" Sanitary Sewer mains and 1,800 lf of 3" force main in an existing County "Highfield Beach Club" and from "The Bluffs" subdivision with small lots and poor soils for septic systems. 6/1/2009

SE Michigan -initially Center for Community We are willing to expand Based Enterprise, Inc the program throughout (C2BE) the State.

Localizing SE Michigan Anchor Institution Supply Chain

Expected Completion Date

Place 2,200 lf of 12" Water Main to connect and loop existing Water Mains and create redundancy in the water system for this portion of the Township. 6/1/2009

Working with the leaders and purchasing departments of local universities, hospitals, governments, foundations, etc., C2BE will identify products/services they use that are not currently provided by local businesses. We will complete feasibility studies on five potential businesses that could be created locally to serve those needs; seek commitments from the relevant anchor institutions; and structure the businesses that are feasible. As needed, we will develop an expediting function to enable efficient loca procurement. C2BE will facilitate business structures (such as employee ownership) to ensure continued local presence, and incorporation of green business practices. ¶This project is modeled after a similar project in Cleveland developed by the Cleveland Foundation, Greater University Circle Project; Maryland Democracy Collaborative and the Ohio Employee Ownership Center (OEOC). Longstanding, close relationships with OEOC and the Democracy Collaborative will enable C2BE to benefi from their experience. 3/9/2009

T O

9/1/2009

10/1/2009

Funding Request

$

D VE

235,000

$

580,000

2/11/2009

$

484,933

2/11/2009

$

921,140

2/11/2009

$

474,032

11/15/2009

$

200,000

O R

Route (Infrastructure Only)

P P A

N s

C2BE’s for-profit subsidiary, Ingenuity US, is an innovation broker for metro Detroit that will foster model CBEs while redeploying intellectual property, technology and human capital to serve growth markets. IUS will help laid-off, highly skilled workers, engineers and managers—who may lack some entrepreneurial skills—create or join emerging businesses through access to intellectual property, diverse expert advisors, creative product development resources, and help finding investors. Through C2BE’s Community Business Resource Network, IUS will help businesses be locally-rooted and highly competitive. ¶C2BE leaders include the president of a company contracted to license 12,000 of GM’s patents; and Ford Motor Co’s Sustainable Business director. They have begun outreach to auto industry engineers and managers. IUS wil partner with Michigan Works to identify other dislocated workers who can benefit. With established companies, IUS is already exploring potential green businesses, including manufacture of energy saving devices powered by renewable resources. With MEDC, IUS will also apply its creative resources to help auto suppliers diversify customers & p3/9/2009

t s e

SE Michigan -initially Center for Community We are willing to expand Based Enterprise, Inc the program throughout (C2BE) the State.

u q e

R d

Ingenuity US - Innovation Broker - creating new economy businesses based on SE Michigan's strengths

e t tt

C2BE will link our region’s existing community-based enterprises (CBEs) into a “Community Business Resource Network,” which will generate business by matching CBEs’ resources to unmet needs. The Network will broker mutually beneficial business relationships to help CBEs scale up. This mutual support strategy has proven effective in the Ohio Employee Owned Network, which has served 93 companies for 20 years, providing joint purchasing, education and resource sharing. ¶C2BE has begun creating a key tool for the Network: a comprehensive “map” of metro Detroit’s CBEs, which will serve CBEs, potential investors, and others through a user-friendly web-based database providing detail on each CBE’s business model, products/services, strategy for growth and market niche. Users will be able to query by geography, industry, product, etc. C2BE began collecting this data—which no one else is assembling—with a scan of successful CBE models worldwide to find those Community Business Resource Network best suited to metro Detroit. Initial interviews with local CBEs confirmed that such Finding, Connecting, and Supporting Metro Detroit Community Based Enterprises (CBEs) research will provide useful information to match resources to needs. The proposed N 3/9/2009 Construct a pedestrian bridge on the municipal site to provide access to the adjacent Municipal Pedestrian Bridge historical site. Municipal offices, Sugar Bush Road. 9/1/2009

i m

b u S

Center for Community Based Enterprise, Inc (C2BE) Metro Detroit Chesterfield Township, Chesterfield Township Macomb County

02262009

Submitted Requests - Not Approved

1051 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Chippewa Township, Chippewa Township Mecosta County

Project Name Chippewa Lake Sanitary Drain Drainage District Upgrade

Project Description

Start Date

Air releases: 39 air releases and vacuum releases repaired and upgraded.

4/1/2009

Chippewa Township

Chippewa Township, Mecosta County

Chippewa Lake Sanitary Drain Drainage District Upgrade

To make necessary upgrades to a 27 year old sewer system, in an economically challenged region, of rural Michigan, to protect the largest natural lake in Mecosta County. This project will help to stimulate the local and state economy by providing funding for the purchase of necessary materials and employing contractors which will be necessary for the compleation of the project. Lift Station # 1 upgrades include upgraded electrical control panels; control housing building with steel entrance door, security fence, natural gas hook-up and landscape restoration. 4/1/2009

Chippewa Township

Chippewa Township, Mecosta County

Chippewa Lake Sanitary Drain Drainage District Upgrade

Drainfrield upgrades: Installation of materails of 16 individual field flow counters wiring 16 field flow counters; 12 field shut-off valves; low voltage transformer and supplies; and installation of DEQ mandated monitoring well. 4/1/2009

Chippewa Lake Sanitary Drain Drainage District Upgrade

Lift Station # 2 upgrades include electrical control panel upgrade; reinforced concrete slab; control housing building with steel entrance door; security fence; ladescape restoration, and natural gas hookup 4/1/2009

Griswold Auditorium Energy Efficiency Improvements

The Griswold Auditorium is the main community facility for public meetings and services. The City was donated the facility in the 1930’s, and we continue to maintain with dedication to the citizens. The State funded a study which in 2007 identified energy efficiency improvements to save thousands of dollars in operational costs by investing in the mechanical systems. With Federal Stimulus, this critical community building can be energy efficient and provide reduced operational costs. 4/1/2009

Dept. of Public Works Energy Efficiency Improvements

The Public Works Garage is the home of the critical services of the City of Allegan. The State funded a study which in 2007 identified energy efficiency improvements which could save thousands of dollars in operational costs by investing in the mechanical systems. With Federal Stimulus, this critical facility can be energy efficient and provide reduced operational costs.

Chippewa Township

City of Allegan

City of Allegan

Chippewa Township, Mecosta County

City of Allegan

City of Allegan

A T

s

t s e

Expected Completion Date

O R

PP

O N

u q e

Sept. 1, 2010

4/1/2009

Funding Request $

Route (Infrastructure Only)

32,000

D VE

Sept. 1, 2010

$

54,218

Sept. 1, 2010

$

67,750

Sept. 1, 2010

$

55,218

6/30/2009

$

110,000 n/a

6/30/2009

$

150,000 n/a

6/30/2009

$

8/15/2009

$

228,000 n/a North Shores and 303,000 Klock Road

7/1/2009

$

550,000 M-63

City of Benton Harbor Benton Harbor

Demolition of Industrial Building Grand Boulevard/ Upton Drive Connector Road

The Regent Theatre is the main attraction to Downtown Allegan and a State recognized Award winner for Historic Preservation. The City purchased the theatre after many attempts by private and non-profits to sustain. The city has done this with the support of the city and other grant funds. The State funded a study in 2007 which identified energy efficiency improvements which could save thousands of dollars annually in operational costs by investing in the mechanical systems. With Federal Stimulus, this downtown icon can be energy efficient and provide reduced operational costs. 4/1/2009 Demolition of this abandoned industrial building located in the middle of the Harbor Shores project area. 5/15/2009 Harbor Shores -- New Road to connect Grand Boulevard and Upton Drive to allow residential traffic to access M-63 4/1/2009

City of Benton Harbor Benton Harbor

Harbor Shores -- Jean Klock Park Linear Park and Trail System

Construction of 12.2 miles of trails to connect 7 new park parcels with existing Jean Klock Park, including trail and picnic facilities within interior of existing Park

4/15/2009

12/31/2011

$

1,000,000 Citywide

W Klock Road

The Klock Road Reconstruction Projet is located in the Harbor Shores Redevelopment area. The project is part of the overall City plan to revitalize and redevelop the abandoned industrial areas in the north portion of the City. The overall project has already resulted in employment for residents and has increased local property values. 6/30/2009

12/31/2010

$

1,885,422 Klock Road

City of Allegan

City of Allegan

City of Benton Harbor Benton Harbor

City of Benton Harbor Benton Harbor

02262009

e t tt

Regent Theatre Energy Efficiency Improvements

i m

b u S

R d

Submitted Requests - Not Approved

1052 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Benton Harbor Benton Harbor

City of Benton Harbor Benton Harbor

City of Benton Harbor Benton Harbor

City of Benton Harbor Benton Harbor

City of Benton Harbor Benton Harbor

City of Benton Harbor Benton Harbor

E Klock Road

The Klock Road Extension Projet is located in the Harbor Shores Redevelopment area and connects two major north-south arteries: Paw Paw Avenue and North Shore Drive. The project provides for increased capacity for transportation to and from the Harbor Shores developement and the City as a whole. The project is expected to provide jobs for local residents as well as local contractors. 6/30/2009

Water Filtration Plant

Water Filtration Plant Renovations are required by the MDEQ. The project will completely renovate the existing process and buildings. The City will utilitze local labor to complete the project providing work for both skilled and unskilled labor. The completion of the project should expand the City's capacity to provide quality drinking water throughout southwest Michigan. 9/31/09

Broadway Avenue

The Reconstruction of Broadway Avenue and its underground utilities will increase the City's capacity to provide municipal services to its residents and businesses while increasing the non-motorized transportation network within the City. The project will employ local busineses and residents as much as possbile to recreate this major corridor through the City. 9/12/2009

Sidewalk Improvements

The sidewalk conditions throughout the City do not meet the required standards for accessibility. Extensive improvements are required through the City to correct this condition. Local residents and contractors are targeted for contracting this work.

BH City Hall

t i m

City of East Tawas

East Tawas, Michigan

S

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

02262009

D VE

3,100,566 Graham Avenue

12/31/2010

$

1,500,000 Klock Road

12/31/2011

$

14,500,000 Jean Klock Park

12/31/2010

$

3,000,000 Broadway ave

12/31/2010

$

5,000,000 Citywide

The City Hall is in need of repair. The proposed project will restore the exisitng building to its previous condition. The refurbished building will use green technology t reduce energy consumption and provide an improved atmosphere for City patrons. The construction will provide jobs for lcaol residents and area contractors. 9/1/2009

12/31/2010

$

5,000,000 City Hall

The Benton Harbor Ship Canal Project will reopen what was once the City's largest port. The project includes the environmental remediation, dredging and walkability of the former ship canal site to create a navigable waterway leading to Downtown. , as well as the extension of Graham Avenue, Core Neighborhood Sidewalk Initiative, and the Klock Road Resurfacing and Expansion. In addition there will be a new road and bridge for pedestrian mobility. The reopened Canal will reshape the downtown area increasing the City's capacity to provide services for shipping, boating and tourism. The opened canal will increase the City's access to the St Joseph River and Lake Michigan while providing both short and long term employment for City residents both skilled and unskilled. 4/30/2009

4/30/2011

$

T O

s t s

q e R

O R

P P A

-N

Linking trails, Durant to Dillon Parks

Create multi-use pathway through city streets between two major city parks.

Housing Commision rehabilitation

Rehabilitate existing 44 unit, low income, senior citizen housing complex

Emergency Notification Emergency backup energy system at Hastings City Hall building facility.

Installation of warning sirens in the City of Hastings to be used for the purpose of emergency preparedness during weather related situations, or airborne and/or biological threats. Installation of a new 85-kw natural gas fueled generator to serve the existing main distribution panel at the City Hall building facility.

Energy efficiency improvements - City Maintenance Garage facility.

Replace current heating system at City's maintenance garage with radiant heating system; upgrade current lighting system to energy efficient bulbs, ballasts, and fixtures.

Submitted Requests - Not Approved

10/1/2011

Funding Request

Route (Infrastructure Only)

$

8/31/2009

e u

ub

East Tawas, Michigan

Start Date

Graham Avenue Extension

Benton Harbor Ship Canal

City of East Tawas

Project Description

The Graham Ave Extension Project is located in the Harbor Shores Redevelopment area. The project provides a critical link betwenn the downtown area of the City, the ship canal and the Harbor Shores Development. The extension of Graham Avenue wi increase the City's capcity to provide adequate transportation through the City while providing jobs to area residents. 7/31/2009

d e tt

City of Benton Harbor Benton Harbor

City of Hastings

Project Name

Expected Completion Date

BL 94 at Riverview 13,600,000 Drive

5/15/2009 Fall 2009 Fall 2009 / Spring 2010 Fall 2011

$

100,000

$

2,500,000

7/1/2009

6/30/2010

$

50,000

7/1/2009

12/1/2009

$

51,500

7/1/2009

12/1/2009

$

75,000

1053 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Hastings

City of Hastings

Englewood Street Improvements.

Construction of Englewood from Grant Street to Lincoln Street to include new curb and gutter, drive approaches, sidewalk, water main, sanitary sewer, storm sewer and asphalt paving. 7/1/2009

City of Hastings

City of Hastings

Monroe Street Improvements.

Construction of Monroe Street from High Street to Praire Street to include new curb and gutter, drive approaches, sidewalk, storm sewer and asphalt paving.

7/1/2009

City of Hastings

DDA Parking Lot #1 Improvements

Complete reconstruction of Parking Lot #1 including removal of concrete pavement, drive approaches, curb and gutter, and bituminous pavement. Reconstruction of pavement, drive approaches, curb and gutter, and storm sewer improvements.

5/1/2009

City of Hastings

Emergency backup energy system at Hastings Water Treatment Plant building facility.

Install a new 500-kw diesel powered generator to serve the Hastings Water Treatment Plant building facility distribution panels.

7/1/2009

City of Hastings

Construction of Thorn Street from Second Street to the east platted limits of Thorn Street and on Third Street from Thorn Street to Mill Street to include new curb and gutter, drive approaches, sidewalk, water main, sanitary sewer, storm sewer and Thorn Street and Third Street Improvements. asphalt paving.

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

125,000

$

130,000

12/1/2009

$

200,000

11/1/2010

6/30/2011

$

200,000

Street Lighting Improvements.

6/30/2010

$

225,000

North Church Street Improvements.

Construction of approximately 965 lft of new curb and gutter in Church Street from West High Street to West State Road, storm sewer improvements, and asphalt paving.

6/30/2011

$

241,250

6/30/2011

$

250,000

12/1/2010

$

266,500

6/30/2011

$

275,000

T O

N s

7/1/2009

st

e u

Construction of Blair Street from Broadway to Jefferson and from East Street to Wilson Avenue to include new curb and gutter, drive approaches, sidewalk, water main, sanitary sewer, storm sewer and asphalt paving.

City of Hastings

Blair Street Improvements.

City of Hastings

City of Hastings

City of Hastings

City of Hastings

Storm drainage outfall improvements. Enterprise Drive and cul-de-sac improvements.

eq

7/1/2009

R d

e t tt

i m

Orchard Street Improvements.

ub

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

City of Hastings

Phase I Curb and Gutter Improvements.

City of Hastings

City of Hastings

Phase II Sidewalk Improvements.

02262009

D VE

Old Blue Building Improvements. Park and playground equipment improvements

Replace deteriorated outfalls to the Thornapple River at Market & Apple Street, Apple & Cass Street, Mill & Washington, and Taffee Drive & High Street. 7/1/2009 Construction of new road and cul-de-sac, sanitary sewer improvements, storm sewer improvements, and water main improvements. 7/1/2009

12/1/2010

$

300,000

12/1/2010

$

312,000

Construction of Orchard Street from Clinton Street to the south platted limits of Orchard Street, and from Clinton Street north to Madison Street to include new curb and gutter, drive approaches, sidewalk, water main, sanitary sewer, storm sewer and asphalt paving. 7/1/2009

6/30/2011

$

325,000

6/30/2011

$

350,000

6/30/2010

$

385,000

7/1/2009

6/30/2010

$

506,000

7/1/2009

6/30/2010

$

600,000

Adaptive re-use and complete renovation of old water treatment plant building as downtown public restrooms and an art/history/visitor community center overlooking the south bank of the Thornapple River and located next to the Hastings Riverwalk Trail. 7/1/2009 New equipment and barrier free surfacing at Bk Park, FH Park, Tyden Park, Second and Third Ward Parks. 7/1/2009 Removal of 50 blocks (20,000 lft) of existing deteriorated curb and gutter, replacement of 50 blocks of curb and gutter with new, and also right-of-way work. Construction of approximately 2.0 miles of new sidewalk throughout the limits of the City of Hastings.

Submitted Requests - Not Approved

Route (Infrastructure Only)

97,500

$

O R

P P A

Construction of East South Street from Dibble Street to Orchard Street to include new curb and gutter, drive approaches, sidewalk, storm sewer and asphalt paving. 7/1/2009 Construction of new road and cul-de-sac, sanitary sewer improvements, storm sewer Incubator drive and cul-de-sac Improvements. improvements, and water main improvements. 7/1/2009

S

6/30/2011

$

7/1/2009

East South Street Improvements.

City of Hastings

6/30/2011

Funding Request

Street lighting improvements in State Street from Broadway to Boltwood, in Michigan Avenue from Apple to Court, in Jefferson from Apple to Court, and in Church from Apple to Court, and to include replacement of existing night master boxes and place new stainless steel boxes. 7/1/2009

City of Hastings

City of Hastings

Expected Completion Date

1054 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Hastings

City of Hastings

City of Hastings

City of Hastings

Project Name

South Jefferson Street Improvements. South Hanover and Shriner Street Sanitary Sewer Improvements.

Project Description

Start Date

Construction of approximately 2500 lft of new curb and gutter in Jefferson Street from Nelson to the south end limits, new drive approaches, storm sewer improvements, and asphalt paving. 7/1/2009 Construction of a new 12 inch sanitary sewer main from the east City limits in Hanove to Shriner and in Shriner from Hanover to Michigan Avenue. 7/1/2009

6/30/2010

$

690,000

12/1/210

$

820,000

6/30/2010

$

845,000

7/1/2009

6/30/2011

$

910,000

7/1/2009

12/1/2010

$

1,200,000

7/1/2009 7/1/2009

6/30/2010 12/1/2011

$ $

1,600,000 4,500,000

10/1/2010

$

1,000,000 Transportation Area Agency on Aging Wayne 3,500,000 County, MI General 4,500,000 Construction

City of Hastings

City of Hastings

Booster Station Improvements.

South Michigan Avenue sanitary sewer system capacity improvements.

Replacement of approximately 980 lft of existing 8 inch sanitary sewer in Michigan Ave. from South Street to Madison Street. Also, replacement of approximately 2300 lft of 8 inch sewer main in Michigan from Madison to Grand, in Grand Street from Michigan to Boltwood, and in Boltwood from Grand to Green Street with a new 12 inch sanitary sewer main. 7/1/2009

Bachman Road Improvements.

Construction of Bachman Road from Woodlawn Avenue to the north City lomits to include new curb and gutter, sidewalks, drive approaches, storm sewer, underdrains, and asphalt pavement. 7/1/2009

City of Hastings

City of Hastings

City of Hastings

East Mill Street Improvements.

City of Hastings

City of Hastings

Reconstruction of Michigan Avenue Bridge

City of Hastings City of Hastings

City of Hastings City of Hastings

Phase III Riverwalk Improvements. New Fire Station

City of Inkster

Inkster, Michigan

City of Inkster

Inkster, Michigan

City of Inkster

Inkster, Michigan

Inkster Road underpass

itt

d e t

Inkster Senior Citizens Wellness Center Farnum District Sanitary Releif Sewer and Pump Station

m b u

T O

s t s

-N

e u

q e R

O R

P P A

Construction of East Mill Street from the 900 block of Mill Street to the east City limits to include new curb and gutter, drive approaches, sidewalks, water main, sanitary sewer, storm sewer, underdrains and asphalt paving. Bridge deck replacement, widening, structural repairs, guardrail, utility relocation, design and construction engineering and approach work. Industrial Pk. Dr. to North Broadway, Thorn Street, Church Street to Apple Street, State Street to Riverwalk Park, Riverwalk Park to the east City limits. Construct and relocate new fire station

D VE

625,000

Michigan Avenue and East Marshall Street Improvements.

City of Hastings

600,000

$

City of Hastings

6/30/2010

$

605,000

City of Hastings

City of Hastings

6/30/2010

Funding Request

Route (Infrastructure Only)

$

Construction of approximately 600 lft of curb and gutter in Michigan Avenue from Marshall Street to Clinton Street, storm sewer improvements, and asphalt paving. In addition, construction of approximately 1900 lft of curb and gutter in Marshall Street from Jefferson east to the existing pavement, storm sewer improvements and asphalt paving. 7/1/2009 Construction of a booster station and pressure district north of Woodlawn Avenue and east of Broadway. 7/1/2009

City of Hastings

Expected Completion Date

Inkster Road underpass - under the Amtrack rail tracks currently has a dangerous pedestrian passage. If Inkster residents attempt to cross this section of Inkster Road over the rail tracks - they violate the rail road law and many of the Inkster residents have received violation citations for crossing the rail tracks. During winter months, snow is constantly pushed on to the current 4 ft. sidewalk (with no guard rails) and the pedestrains have no choice but to walk on a very, very busy road. There is no SAFETY here for pedestrians or vehicle traffic. 10/1/2009

6/30/2010

Currently, Inkster seniors have no facilities in Inkster. There are some activities provided at the Inkster Recreational Complex - however, this complex is inadequate and was not designed or built for senior type activities. This building is an older infrsturcture and has very limited use.

5/1/2009

5/1/2010

$

To mitigate basement flooding and add capacity in the sanitary sewer district.

11/15/2009

12/1/2010

$

S 02262009

Submitted Requests - Not Approved

1055 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Inkster

Inkster, Michigan

Inkster Police Department & Court

City of Jackson

Jackson, MI

Roof Replacemnt

City of Inkster Police Department currently operates out of building that does not meet any standards for employee safety or prisoner safety. Concurently the current building that houses the 22nd Judicial Court is absolete for normal functioning purposes. The public and prisoner ciruclation is so intermingled to the extent that it poses extreme security mesasures to the Judge, employees of the Court, the public and prisoners. Inskter Police Department - the Homecide Investigation unit operates out of the basement of the current building and the police redord storage is in the same basement - that is subject to frequest floods and sewer back-ups. This building has the potential of asbestos and fire safety hazards both to the City employees and the public. Inskter 22nd District Court has the highest volume of court case as a single district court in Southeastern Michigan and is also subject to the same hazards at the police bulding - given it is a shared building between the Courts and the Police Department If the Court is operating 2 court rooms - there is no room for public given the court is so small. 9/1/2009 Existing roof on Public Services combination Administration Offices and Motor Pool facilities is in need of replacmenrt.

Storm Water Control

Storm Water NPDES Permit requirements, necessitates the construction and installation of storm water components to properly control and discharge storm runoff from the Public Services facilities, which is located along the Grand River.

City of Jackson

Jackson, MI

T O

City of Jackson

Jackson, MI

Maint Garage Expansion

City of Jackson

Jackson, MI

N. Dwight Street

Louis Glick Highway

City of Kingford

City of Kingsford

Area"A" Storm Sewer Separation Project

City of Kingsford

City of Kingsford

City of Kingsford

City of Kingsford

City of Kingsford

City of Kingsford

City of Menominee

City of Menominee

City of Menominee City of Yale

ub

S

City of Menominee YALE

02262009

t i m

Hamilton Avenue

7/1/2011

N s

eq

180,000 N/A

$

100,000 N/A

$

200,000 N/A

$

394,800 N. Dwight Street

$

Business Route 512,415 M50/US127

12/9/2009

$

1,587,690

11/9/2009

$

114,500

Reconstruction of Hamilton Avenue from North Boulevard to Union Street. Hamilton Avenue is a Federal Aid Route that provides access to Breitung Township Middle/High School and Dickinson-Iron Vocational School. 8/9/2009

11/9/2009

$

118,800

11/9/2009

$

255,000

11/9/2009

$

560,500

7/1/2010

$

90,000

Summer, 2010 7/9/2009

$ $

1,725,000 110,000

Municipal Parking Lot Reconstruction

Municipal Marina Dredging CITY HALL ENERGY CONSERVATION

Continuing declines in Lake Michigan's water levels have resulted in lower water level within the municipal marina. This has created problems with utilization of all of the marina's slips and the movement of watercraft within the marina. There is a need to dredge all areas within the marina to a depth of ten feet to remedy these problems. Summer, 2009 REPLACE SINGLE PANE WINDOW WALLS - SEAL 6/9/2009

New Street and Utilities

$

Reconstruction of Breen Avenue from Birch Street to Lawrence Street. Breen Avenue is a Federal Aid Route that provides access to a number of businesses that include retail, wholesale and services. 8/9/2009

Reconstruction of Balsam Street from Breitung Avenue to Pyle Drive. Balsam Street is a Federal Aid Route that provides access to the industrial area of the city. 7/9/2009 Construction of a new street on city owned property to accommodate development zoned general business. 6/9/2009 Reconstruction and repaving of the municipal parking lot at the City Hall/Police-Fire Complex 7/1/2009

Balsam Street

$

Department of Justice & 10,000,000 Homeland Security

Water main replacement on state trunkline, Louis Glick Highway & business route M50/US127. Will loop exisitng mains to improve water quality and provide economic development opportunities within the downtown business loop. Separation of sanitary sewer and storm sewer in the location of the city identified as Area "A" as defined in the May 2006 engineering study. 5/9/2009

R d

e t t

Breen Avenue

P P A

st

e u

Jackson, MI

City of Kingsford

O R

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

Expand existing motor pool repair facility. Exisitng facility is too small to accommodate municipal vehicle fleet maintenance. A Mutual Aid Support Initiative & Fire Services Study includes centralizing procurement and repair of emergency service vehcles through this agency. The City of Jackson Motor Pool could service exisiting fleet and additional fleet vehicles from surrounding municipalities. Replace aged water main to improve water quality and improve fire flows serving community residents

City of Jackson

City of Kingsford

Expected Completion Date

1056 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Coloma Township Coloma Chrtr. Twp. Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County Columbia Township, Columbia Township Jackson County

Geneva Township

Geneva Township

Sanitary Sewer Sanitary Sewer Water Main Water Main Sanitary Sewer Roads Sanitary Sewer Sanitary Sewer Roads Sanitary Sewer Sanitary Sewer Sanitary Sewer Sanitary Sewer Roads Sanitary Sewer Sanitary Sewer Water Main

Project Name

Project Description Sanitary Sewer on Coloma North Road Sanitary Sewer on Ryno Road Install WM Ravine View Estates to Morningaire Install water main Shore Drive/Wil-O-Paw Sanitary Sewer on Morningaire and Weatherly Becht Road from Taube Rd. to Van Rd. Sanitary Sewer on Defield Road Sanitary Sewer on Mountain Road Becht Road from Little Paw Paw Lake Rd. to Hagar Shore Sanitary Sewer on Angling Road Sanitary Sewer on Boyer Road Sanitary Sewer on Wilson/Bundy Roads Sanitary Sewer - Paw Paw Lake Rd. Hagar Shore Area Van Rd. from Becht to Coloma North Sanitary Sewer on Wilson Road Sanitary Sewer for I-94 Business Area Extend Water Service to I-94 Business Area

Township Park

Expand Twp Park, Hyde Road

Road Signs

Purchase 100 Road Signs

Disaster Centers

Purchase Relief Supplies

Township Vehicles

Start Date 5/1/2009 8/1/2009 5/1/2009 5/1/2009 5/1/2009 8/1/2009 5/1/2009

Expected Completion Date 6/1/2009 6/1/2009 6/1/2009 6/1/2009 6/1/2009 10/31/2009 6/1/2009

8/1/2009

10/31/2009

Funding Request 145,000 285,000 295,000 305,000 305,000 330,000 335,000 380,000 720,000 800,000 890,000 1,050,000 1,290,000 1,300,000 1,325,000 1,610,000 2,660,000

8/1/2009 8/1/2009

P P A

8/31/2010 8/31/2010

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

4/1/2009

6/1/2009

$

20,000

3/1/2009

6/1/2009

$

30,000

3/1/2009

4/15/2009

$

50,000

Purchase 2 alternative fuel vehicles for twp business

7/1/2009

8/1/2009

$

60,000

Dry Hydrants

Install 30 Dry Hydrants

5/1/2009

8/1/2009

$

75,000

Township Park

Construct Water Park

5/1/2009

6/15/2009

$

80,000

Construct 960 Sq Ft Addition

7/1/2009

9/1/2009

$

150,000

Upgrade 7 miles to current standards

5/1/2009

7/1/2009

$

150,000

Construct 20x60 Addition

4/1/2009

8/1/2009

$

250,000

Extend Sanitary Sewer System

6/1/2009

9/1/2009

$

400,000

Install Odor/Corrosion Preventation Equipment

4/1/2009

10/1/2009

$

450,000

Purchase Ladder Truck

3/12009

6/1/2010

$

800,000

Non-motorized Trails Retrofit

Construct 2.5 miles of new trails

6/1/2009

10/1/2009

$

1,200,000

Geneva Township, Van Buren County

Water Main Extension along M-43 Highway from 12th Avenue to 69th Street and along 69th Street from M-43 Highway to CR 380

Place 14,250 lf of 12" Water Main to an area of the Township that has low water capacity. Existing wells have problems drawing enough water. Many residents have to cycle everyday household duties, such as washing clothes and dishes during off hours of the night due to how long it takes to get water. 6/1/2009

11/1/2009

$

1,183,895

Geneva Township, Van Buren County

Place 20,300 lf of 12" Water Main to an area of the Township that has poor water quality. Existing wells have problems with arsenic and many residents don't use the Water Main Extension along 8th Avenue from water for drinking water. Area to be served has existing subdivisions, existing CR 689 to 68th Street and along 68th Street manufactured housing park, existing golf course and the potential for additional housing developments. 6/1/2009 from CR 388 to CR 384

11/1/2009

$

1,675,000

Fire Station #2 Non-motorized Trails Retrofit Fire Station #1

tt i m

Sewage Lift Station Fire Engine

b u S

02262009

d e t

Miller Elementary Sewer

s t s

5/1/2009 8/1/2009

T O

-N

e u

q e R

Submitted Requests - Not Approved

O R 6/1/2009 10/31/2009

Route (Infrastructure Only)

D VE

1057 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Gogebic County

City of Bessemer

Goodwill Industries of Greater Detroit Contact: Russ Russell Detroit

Project Name

Project Description

Start Date

Expected Completion Date

Expansion of the jail cellblock and new garage construction. Upgrade facility to include; electrical, windows, plumbing, air exchange system, & surveilance cameras. Implemation of new E911 center. 5/9/2009

Gogebic County Jail

Workforce Development: Clean Downtown

Through its enhanced strategic plan, the Downtown Detroit Partnership in collaboration with Goodwill Industries of Greater Detroit, hopes to expand the services of Clean Downtown to other parts of the city. The Clean Downtown initiative was created through the collaboration of two non-profits, the Downtown Detroit Partnership (DDP) and Goodwill Industries of Greater Detroit. The goal of this initiative is to maintain the cleanliness standard set forth by the Super Bowl XL, hosted in Detroit in 2006. The primary objective then and now is to enhance the visual appearance of the downtown Detroit environment and to continue to make our city inviting for workers, residents, visitors and potential investors. This project puts uniformed cleanup crews on downtown streets seven days a week to sweep and clear all litter and trash, power wash sidewalks and bus shelters, remove graffiti and assist with other beautifcation projects including all landscaping improvements throughout the core downtown Detroit business district.This unique program is predominatly staffed by workers from Goodwill Industries of Greater Detroit, many of whom are in a 5/1/2009

T O

Funding Request

Route (Infrastructure Only)

5/10/2009

P P A

O R

D VE

5/1/2011

$

1,735,500

5/1/2011

$

2,000,000

10/10/2009

$

4,700

$

3,000,000

N s

Goodwill Industries of Greater Detroit Contact: Russ Russell Detroit

Through a new strategic plan, Goodwill Industries of Greater Detroit intends to expand their Asset Recovery Services. Presently Goodwill has worked with DTE Energy Inc. for 66 years and has performed reclamation services on oil filled equipment, scrap metals, scrap wire and cable, paper and cardboard recyling, electronic waste decomission and recyling. We also assist DET Energy with cost avoidance opportunties such as return to stock and internal fabrication. Goodwill recycles everything for DET, nothing goes to landfills. Goodwill's Asset Recovery Operation is eco-friendly and will gives a great return on investment. The process works like this: 1. Collect waste generated during the production process. 2. Process material to its purest state. (copper, aluminum, plastic, steel, etc.) 3. Sell the recovered goods in the open markets. 4. Issue check for the "net due" from asset sale. Goodwill also manages the DET Energy website to sell recovered commodities on the world market. In our brochure we state Goodwill will "turn your trash to cash". Goodwil 5/1/2009

Asset Recovery Services

t s e

u q e

R d

Historical Society of Marine City

Holland Board of Public Works

Mariners Maze

The Mariners Maze is designed in the shape of a ship's wheel that is 60 feet in diameter. There are 2 concentric rings of low hedgerows, broken by ADL compliant pathways leading to the center. The paths incorporate hopscotch areas for children, memorial bricks, 4 curved bench seating areas, multiple seats and tables with checkerboard inlays for checkers and chess, 8 inlaid large tile mosaics of ships built in Marine City in the mid 1800's to 1930's, 8 inlaid large mosaics with nautical theme, large central Compass Rose and a 1920's bronze ship's helm and binnacle. The interactive maze is designed for games for all ages; as an educational structure depicting Marine City's nautical history,a place for recreation and for enjoying the sights and activities on the St. Clair River. The Hisrorical Society of Marine City believes this structure will draw tourists to our town. Marine City, along with other small communities along the St. Clair River, are having a difficult time with their economies. The more tourists that come to our area, the greater the economic impact. 5/8/2009

Carbon sequestration test well

Project will involve construction of monitoring well infrastructure in the Mount Simon geographic reservoir in the Holland, MI area to confirm the carbon sequestration capacity of the formation and support clean coal project.

e t tt

i m

Marine City

Holland, MI

02262009

b u S

Submitted Requests - Not Approved

1058 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

As consumers do more shopping online, companies are investing heavily in their ecommerce operations to meet the new demand. Most e-commerce stores struggle to convert their online visitors into customers. The average e-commerce store converts less than 2% of its visitors into customers. New technology that relies on usability and conversion optimization principals is allowing some e-commerce stores to report double digit conversion rates.

Invesp Consulting LLC Southfield

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing, MI

Lansing, MI

We propose a software projects to develop e-commerce optimization application that will allow online retailers increase their sales via the process of persona creation. The new software will help ecommerce stores create unique content that appeals to their target market. This project will provide for new jobs in the technology, marketing and E-commerce conversion optimization software e-commerc sectors. 4/1/2009

4/1/2010

D VE $

6,155,000

$

6,500,000

$

12,500,000

Drinking Water Infrastructure Energy Efficiency Improvements

One of the largest electric users in a City environment is the drinking water system, with much of the energy usage on-peak. This project includes the installation of energy efficiency improvements in all aspects of the drinking water transmission and distribution system, including variable frequency drive motors on wells (the BWL has 122 14” wells), wellhead pre-conditioning and high efficiency high speed pumps (often 1,000 horsepower each).

Smart Grid Investment

Invest in advanced relaying, metering & communications at the 138 and 13. 2 kv substations to allow more efficient utilization of transmission & distribution system, improve distribution reliability & enable deployment of distributed generation. This investment supports the overall goal of utilizing distributed, renewable energy sources within a metropolitan area. Program targets 65% of substations for investment based on reliability needs & potential for distributed generation options.

Solar Power Deployment

This project involves the deployment of distributed solar generation technologies throughout the Lansing area. The project will include the installation of multiple solar installation and technologies in the 1Kw to 20Kw size range to be located on buildings in various downtown areas and larger ground level installations in the 50Kw to 100Kw range located strategically where the current land size, land uses and transmission and distribution infrastructure best supports the utilization of large solar installations.

$

2,000,000

Interconnect the Lansing Board of Water and Lights electric distribution system to a landfill methane electric generation facility located outside the Lansing service territory. This project will allow Lansing to interconnect with the production facility in order to take advantage of the facility as a renewable energy source and to meet renewable energy portfolio standards.

$

2,000,000

This project involves the replacement of traditional metering with advanced metering infrastructure (AMI). AMI allows two way communications with customers, improves system reliability, reduces system losses, and supports distributed generating technologies. AMI represents a significant component of smart grid applications and will be important in promoting distributed renewable generation options. Project represents first phase of AMI system for approximately 96,000 electric, 55,000 water meters and 200 steam meters. This phase will include installation of networking infrastructure, billing and customer information systems to store and process data to allow for end use product for customers to measure energy efficiencies measures per meter. First phase include conversion of approximately 32,000 meters.

$

21,000,000

s

t s e

O N

u q e

Lansing, MI

Lansing, MI

Lansing, MI

02262009

R d

e t tt

i m

Landfill Gas Interconnection

b u S Lansing Board of Water & Light

A T

PP

O R

Funding Request

Route (Infrastructure Only)

AMI Advanced Metering Initiative

Submitted Requests - Not Approved

1059 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing Board of Water & Light

Lansing, MI

Lansing, MI

Project Name

Project Description

Biomass & Biofuel Injection Systems for Conventional Coal Plant Conversion

This project includes the installation of equipment and materials to allow biomass fuels to be utilized in a conventional pulverized coal fired boiler. Burning biomass fuels (produced using various waste products) will reduce the amount of coal burned and the associated greenhouse gas emissions and produce renewable energy in the process. The project will support the burning of biomass fuels utilizing various mechanical systems to provide a safe and efficient combustion process without any associated loss of existing generating capacity. This project also involves the co-firing of a conventional pulverized coal generation unit with biodiesel to generate renewable energy using existing generation assets. The project infrastructure would include loading/unloading facilities for handling large quantities of bio-diesel, inside storage including agitated tank systems to prevent the bio-diesel from gelling, and bio-diesel injection guns. A majority of the power plants in the U.S. utilize pulverized coal fired boilers and this technology would have widespread application throughout the utility industry if proven viable.

Plug-In Hybrid Vehicle Infrastructure & Fleet

This project includes the replacement of all 40 light-duty in-town fleet at the public power system, plus 20 additional City of Lansing vehicles with hybrid plug-in electric vehicles and the infrastructure to charge the vehicles.

Wind Turbine Deployment

O R

Funding Request

PP

4,800,000

$

7,000,000

This project implements a strategy to capture wind energy in and around the Lansing metropolitan area. The project will make use of different sizes and types of wind turbines to properly fit the best wind duration/intensity locations within the Lansing metropolitan area. Eight to ten windmills will be 5 to 20 Kw vertical machines that are designed for siting on buildings and other structures within a downtown area. Six additional windmills will be larger, 250 kW, placed strategically to take advantage of elevated topology and high impact wind duration/intensity locations within the Lansing area. The projects are designed to capture the benefit of distributed renewable energy sources within a metropolitan area for the supply of electric power and to utilize existing transmission and distribution infrastructure.

$

7,000,000

Narrowing the Gap…Addressing the Michigan Challenge Michigan has unique challenges related to the extension of cyberinfrastructure into rural areas due to such factors as the economy, geography, terrain, and weather. As a result, proliferation of broadband services in key rural areas of the State has been lacking or severely limited. To understand the extent of the geographic challenges involved in reaching outlying areas, it is helpful to consider the backdrop against which Michigan rural healthcare, distance learning and other broadband-dependent initiatives are played out. Michigan’s footprint spans 96,810 square miles with 3,288 miles of shoreline. Michigan’s footprint spans 96,810 square Immediate miles with 3,288 miles of shoreline. Michigan is depending on the 11th largest State in the US and the 8th most populous. weather and when Michigan’s Upper Peninsula is 90% forest, with 200 inches average snowfall. project is Michigan has 83 counties, 70% of which are rural. Merit has developed the “Michapproved 18 mos after start

$

29,625,000

$

3,500,000

A T

t s e

Route (Infrastructure Only)

D VE $

s

Lansing, MI

Start Date

Expected Completion Date

O N

u q e

R d

Merit Network

i m

Ann Arbor

Michigan Reach

ub

Merit Network

S

State of Michigan

02262009

e t tt

Internet2, working with Merit and the University of Michigan, Michigan State University and Wayne State University, has secured a fiber facility which reaches from Cleveland to Chicago and connects Merit’s in-state fiber infrastructure to the rest of the world. In order to support the programs outlined above, the equipment “lighting” that span needs to be upgraded to substantially expand capacity. The equipment is now National Connectivity for the State of Michigan available and would cost approximately $3.5 million. Immediate

Submitted Requests - Not Approved

6 mos after start

1060 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Merit Network

Monroe County ISD

Monroe County ISD Moscow Township Moscow Township Moscow Township Moscow Township Moscow Township Moscow Township Moscow Township

Quincy Mine Hoist Association

Quincy Mine Hoist Association

Ann Arbor

Monroe

Monroe Moscow Township, Hillsdale County Moscow Township, Hillsdale County Moscow Township, Hillsdale County Moscow Township, Hillsdale County Moscow Township, Hillsdale County Moscow Township, Hillsdale County Moscow Township, Hillsdale County

02262009

Start Date

Michigan Reach

Math/Science Center

The Monroe County ISD in collaboration with Monroe Public Schools plans to construct 3 additional classrooms at a Math/Science Center, which will be open to all students in Monroe County. The addition of the classrooms will also require an upgrade to the HVAC system. Summer 2009

400,000

Summer 2010

$

5,000,000

Fall, 2009

$

20,000

Fall, 2009

$

100,000

Spring, 2009

Fall, 2009

$

130,000

Spring, 2009

Fall, 2009

$

130,000

Purchase a new Pumper Fire Truck Spring, 2009 Build a new fire station and township hall in one building or renovate/remodel existing old buildings. Spring, 2009 To construct and erect wind turbines as we presently have a favorable location for wind velocity needed for the turbines. Spring, 2009

Fall, 2009

$

300,000

Summer, 20l0

$

500,000

September, 20l0

$

2,000,000

Work involves restoration of forty (40) Hoist House metal frame divided-light windows. Repairs to lower level windows shall include repairs to mullion and frame components and replacement of cracked or broken glass panes. Repairs to upper windows include removal of deteriorated fiberglass panels and installation of new glass panes. 4/1/2009

12/31/2009

$

400,000

Phase I includes determining the extent of rebar deterioration in areas where the reinforcing steel remains encased in concrete, evaluatiing the integrity and strength of the concrete elements, and preparing plans and specifications for preventing additional deteriorationof these elements. The scope will also include determining the most appropriate techniques and materials for the restoration of sufficient structural integrity to insure life-safety of visitors to the structure and prevent any catistrophic failure tha would lead to the loss of the building and the Nordberg Hoist housed within Phase II would be the actual restoration of structural integrity. 6/1/2009

12/31/2009

$

1,200,000

Purchase a new Rescue Truck

New Grass Rig

Purchase a new Grass Rig Fire Truck

s t s

-N

e u

New Pumper Fire Truck Fire Station and Twp Hall Wind Turbines

T O

d e t

bm

1918 Hoist deterioration assessment and stabilization

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

New Rescue Truck

Park Pavillion

Funding Request

Spring 2010

Toxic Waste, Wetland Cleanup

Monroe County Middle College

O R

P P A

The Monroe County ISD was awarded a Middle College High School Health Partnership Grant by MDE. To accommodate High School students on the college campus, the MCISD would like to build a wing on to the Monroe County Community College. This wing would consist of 8 classrooms, 2 science labs, 6 offices and a storage area. Summer 2009 Build a pavillion on existing park property for family reunions, picnics, shelter from inclemate weather, build trails, etc. Spring, 2009 To clean up a small wet land area that was previously used as a solid waste dumping ground and is now harboring stagnant water Spring, 2009

1918 Hoist Window replacement

u S

Project Description

Funding Required: Merit has identified 30 target fiber builds along strategic routes required to complement Merit’s existing backbone network within the State of Michigan. Each segment significantly expands the reach of the Merit Network into rural areas, enhancing access to hundreds of schools, medical facilities, universities, community services, libraries, cultural centers, and government support entities. The total funding required to achieve the primary phase of builds is $29,625,000 expended over a three year period. Michigan REACH would significantly broaden access to vital Immediate services, as well as broaden institutional access to Internet2 at the national level and depending on allow for enhanced communication and collaboration domestically and internationally. weather and when Michigan REACH will avail backbone access to the counties along each route for project is further deployment at the local level. approved 18 mos after start

itt

Hancock

Hancock

Project Name

Expected Completion Date

1061 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Quincy Mine Hoist Association Rollin Township Rollin Township Rollin Township Rollin Township Rollin Township Rollin Township Rollin Township Rollin Township

Hancock Rollin Twp - Lenawee County Rollin Twp - Lenawee County Rollin Twp - Lenawee County Rollin Twp - Lenawee County Rollin Twp - Lenawee County Rollin Twp - Lenawee County Rollin Twp - Lenawee County Rollin Twp - Lenawee County

Project Name

QTLRR Roundhouse Restoration

Project Description

Start Date

Expected Completion Date

Phase I includes construction of new replacement roof structure over existing engine house (round house), salvage and reuse of existing engine house wooden doors, beveled wood columns, and steel engine exhaust roof hoods, repair/rehabilitate existing stone walls, windows, maintenance pits and engine turntable in front of engine house, and installation of railroad trackage inside engine house and leading into and through existing turntable location. Phase II would include the finishing of the interior walls, a complete archeological study, environmental remediation, and completion of the interpretive trail. 4/1/2009 Transfer Station Improvements Tibbs Park Improvements

1,600,000

$

5,000

Nov 15 '09

$

10,000

June '09

Nov 15 '09

$

60,000

June '09

Nov 15 '09

$

75,000

June '09

Nov 15 '09

$

275,000

June '09

Nov 15 '09

$

300,000

June '09

Nov 15 '09

$

350,000

August '09

Jan 1 '10

$

350,000

P P A June '09

Mill Road repaving Manitou Road repaving

T O

Rollin Highway repaving Manor Subdivision paving Round Lake Milfoil Control

s t s

Sanitary Sewer Extension - Townley Highway

O R

-N

D VE $

June '09

12/31/2009

Funding Request

Nov 15 '09

Route (Infrastructure Only)

e u

Corrections Facility Renovation Project

The Sanilac County Sheriff's Correctional Facility rents bed space to the U S Marshals Service. These Federal Inmates include suspected Terrorists, Illegal aliens, and Major Drug Dealers. The facility has a classification deficiency which requires some major renovations. An Addition to the present facilitity would remedy this deficiency. Presently we are planning an addition of approximately 10,000sq feet, and renovating other areas in the facility. This will not only make the facility more secure to the community but increase our ability to better serve the US Marshals Service by housing up to an additional 64 inmates. This project will also improve the local Infrastructure by creating additional Governmental Employment Opportunities including hiring additional staff, Stimulate the Local Economy through purchasing Building Supplies, and employing the private sector work force to do the construction work. February 12,2009 February 12,2010

$

Shelby Library

Construct a community Library to replace the undersized facility located in a former elementary school. The library will be constructed on Township property. All utilities are available to serve the site. 9/1/2009

12/1/2010

$

19,915,000

Mar. 1, 2009

Mar. 30, 2009

$

6,000

Mar. 1, 2009 Mar. 15, 2009

Mar. 30, 2009 Mar. 30, 2009

$ $

7,000 30,000

4/1/2009

5/1/2009

$

40,000

4/1/2009

4/15/2009

$

57,000

Mar. 1, 2009

4/15/2009

$

71,000

4/1/2009

6/30/2009

$

153,500

d e t

Sanilac County Sheriff's Office

City of Sandusky, Michigan

Shelby Township

Shelby Township, Macomb County

Shiawassee County

Corunna

Shiawassee County Shiawassee County

Corunna Corunna

Shiawassee County

Corunna

Shiawassee County

Corunna

Roofs C&H, Surbeck

Shiawassee County

Corunna

Windows C&H

Shiawassee County

Corunna

Courthouse Entry courtyard

02262009

tt i m

ub

OCH attic energy study

S

C&H HVAC study Surbeck HVAC

OCH Entry Airlock

q e R

Discover ways to reduce energy waste in the storage attic of the historic courthouse HVAC balancing study to eliminate energy being wasted from doors held open by HVAC Replace 20 year old HVAC units with new high efficiency unit Design and build an airlock structure at the entance of the courthouse to separate conditioned inside air from the outside unconditioned air Apply high-efficiency rooking to Surbeck & C&H buildings to reduce thermal loss and gain Replace 35 year old single pane windows and exterior doors at the circa 1974 courthouse Develop and install a pedestrian plaza at the entry of the Historic Courthouse with lighting, seating and security baracades

Submitted Requests - Not Approved

Addition to Jail 5,000,000 Facility

1062 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

76th Street Sanitary Sewer Force main Replacement

Upsize an existing Sanitary Sewer Force Main and direct it to another location to increase the contributing area to an existing Sanitary Sewer Lift Station. Project to include 3,800 lf of 6" force main.

6/1/2009

9/1/2009

South Haven Township, South Haven Township Van Buren County

16th Avenue Water Main Loop connection from 73rd Street to M-140 Highway

Place 4,000 lf of 12" Water Main to connect and loop existing Water Mains and undesirable dead ends in the system. It will also help to create redundancy in the water system for this portion of the Township.

6/1/2009

9/1/2009

South Haven Township, South Haven Township Van Buren County

Place 4,500 lf of 12" Water Main to connect and loop existing Water Mains and 72nd Street Water Main Loop connection from undesirable dead ends in the system. It will also help to create redundancy in the 16th Avenue to 20th Avenue water system for this portion of the Township.

6/1/2009

9/1/2009

South Haven Township, South Haven Township Van Buren County

St. Clair Township

St. Clair Township Tahquamenon Area Recreation Authority

Saint Clair Township, St. Clair County

Saint Clair Township, St. Clair County

McMillan Township

Funding Request

$

195,000

D VE $

330,000

$

390,000

8/9/2009

$

225,000

O R

Hollywood Sanitary Sewer

The project proposes to install a sanitary sewer system with within St. Clair Township to serve residents with failing septic systems. The work will consist of furnishing all labor, materials, and equipment required for the installation of approximately 375 feet of 12” diameter sanitary sewer main, 1,050 feet of 8” diameter sanitary sewer main, service lead connections, driveway replacements, drainage culverts, ditching, restoration, and other items incidental to construction. 5/9/2009

M-29 Watermain Replacement

The project proposes to replace a section of watermain along the M-29 corridor between the City Limits of Saint Clair and City Limits of Marysville. The work will consist of furnishing all labor, materials, and equipment required for the installation of approximately 12,730 feet of 12” diameter watermain, watermain branch connections, service lead connections, driveway replacements, drainage culverts, ditching, storm sewer, restoration, and other items incidental to construction. 4/9/2009

10/9/2009

$

2,000,000

Tahquamenon Area Civic Center

An economic development project to construct a Civic Center to serve Luce County and the surrounding area, complete with ice arena, conference and banquet facilities, and indoor walking track. 8/1/2009

7/1/2011

$

5,000,000

SJMO is an aged facility requiring significant enhancement to deliver the highest quality care to the community it serves. In addition, SJMO has approximately only 20% of its patient rooms as private. Several studies have documented the positive impact that private patient rooms have on the recovery process, favorably impacting length of stay, complication rates, and the overall cost of care. Successful completion of this project would provide assurance that SJMO remains competitive, continues to serve the citizens of Pontiac and surrounding communities, and provide continued employment to over 2500 associates. For the twelve months ending June 30, 2008, SJMO providing Community Benefits totaling $26M; $22M for the poor and underserved and $4M for the broader community. 120 Days

Summer 2011

$

230,000,000

SJMO is constructing a $60M surgical pavilion. There is outpatient clinical space as well as attractive retail space being created in conjunction with this construction. This project would ready the space with expected infrastructure and finishes to lease to tenants as well as provide for a larger hospital owned outpatient pharmacy and holistic health center to better serve the community (access, charitable support) 90 Days Surfacing Material for Eqipment 3/9/2009 Deck for Memorial park 4/9/2009 Storage Decant System 4/9/2009 UV Lighting Lean-To 4/9/2009 Welll Capping 10/9/2009 Crush and Reshape of Spencer 4/9/2009 Crush and Reshape of Spencer 4/9/2009 Crush and Reshape of Spencer 4/9/2009 Crush and Reshape of Spencer 4/9/2009 Mill and Overlay of Burk Street 4/9/2009 Wastewater Replacement Pumps (3) 4/9/2009

Fall 2009 3/9/2009 5/9/2009 5/9/2009 6/9/2009 10/9/2009 6/9/2009 6/9/2009 6/9/2009 6/9/2009 6/9/2009 6/9/2009

$ $ $ $ $ $ $ $ $ $ $ $

6,000,000 3,000 5,000 10,000 10,000 20,000 31,944 33,120 34,144 36,080 54,000 75,000

T O

s t s

P P A

-N

Route (Infrastructure Only)

e u

Trinity Health - St. Joseph Mercy Oakland "SJMO" Pontiac, Michigan

Trinity Health - St. Joseph Mercy Oakland "SJMO" Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada

Pontiac, Michigan Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada

02262009

u S

SJMO Patient Tower

bm

itt

d e t

SJMO Surgical Pavilion, NICU, Retail Development Memorial Park Memorial Park Storage Tank Decant System UV Lighting Lean-To Well Capping Lathrop Street Provincial /Georgian Court Hollweg Morrison Lane Burk Street Wastewater Replacement Pumps

q e R

Submitted Requests - Not Approved

Park Park Sewer Sewer Water Streets Streets Streets Streets Streets Sewer

1063 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada Village of Armada

Project Name Spencer Street Wastewater Generator Well Head & Pumphouse Franklin Lane Water Main Replacement Wastewater sewer lining

Project Description Crush and Reshape of Spencer Wastewater Generator Well House 7 Rebuild of Franklin Lane and wrap arounds Water Main Replacement Wastewater Sewer Lining

Village of Armada Village of Armada Village of Homer Village of Homer Village of Homer Village of Homer Village of Homer Village of Homer

East Main Rebuild Sanitary Sewer Reconstruction Fire Hydrant Replacement Program Library Roof Hillsdale St Watermain Replacement Village Hall Roof Plain St Watermain Replacement Watertower Repairs

Rebuild of Wast Main with Water and Sanitary Improvements Sanitary Sewer Reconstruction Upgrade & Replace Dated Fire Hydrants Village Library Roof Replacement Necessary Village Watermain Upgrade Village Hall / Public Safety Roof Replacement Necessary Village Watermain Upgrade Critical Village Watertower Repairs / Upgrades

Manhole Rehabilitation Program

Rehabilitation and / or replacement of manholes found to need repair and / or replacement as a result of the Manhole Inspection Program. Estimate 50% of manholes need rehabilitation.

Main Street Storm Sewer Replacement Rabbit River Park Lift Station #5 Wastewater Outlet

Based on the 2003 CCTV and clean, the storm sewer on Main Street was found to be in a critical state, with joints separated, roots perforating the pipe, and a large amount of groundwater infiltration due to pipe separations and breakages. Most of the existing storm sewer pipe is Vitrified Clay Pipe or Corrugated Metal. We recommend that the critical pipe be removed and replaced. 5/10/2009 Rabbit River Park Improvements June '09 Reconstruction of Aging Lift Station June '09 Wastewater Surface Water Outlet June '09

Woody Biomass Power Project

This project will convert a coal-fired utility boiler to a 12 megawatt, waste-wood biomass generator that will serve 6,000 homes with clean renewable energy.

Village of New Haven

Village of New Haven City of Wayland City of Wayland City of Wayland Wyandotte Municipal Services

Wyandotte Municipal Services Wyandotte Municipal Services Wyandotte Municipal Services Wyandotte Municipal Services

Village of Armada Village of Armada Homer Homer Homer Homer Homer Homer

Village of New Haven

Village of New Haven Wayland, MI Wayland, MI Wayland, MI

Wyandotte, MI

Green Schools Solar Roof Project

Wyandotte, MI

Green Utility Vehicle Fleet

Wyandotte, MI

River Dredging & Maintenance

Wyandotte, MI

Green Windpower on Brownfield Project

S

e t tt

i m

Huron, Tuscola, Sanilac, Saginaw, St. Clair, Lapeer Wireless Broadband Network Expansion Counties Current Coverage Area

02262009

$ $ $ $ $ $

Funding Request 98,604 125,000 250,000 403,451 550,000 636,000

4/10/2009 4/9/2009 6/9/2009 6/9/2009 6/9/2009 6/9/2009 6/9/2009 6/9/2009

6/10/2009 9/9/2009 Fall 09 Fall 09 Fall 09 Fall 09 Fall 09 Fall 09

O R

$ $ $ $ $ $ $ $

783,735 1,517,500 10,000 25,000 140,000 150,000 165,000 195,000

4/10/2009

12/10/2009

$

160,000

10/10/2009 November '09 September '09 October '09

$ $ $ $

630,000 100,000 200,000 200,000

$

1,000,000

$

1,000,000

$

2,000,000

$

3,000,000

$

5,000,000

$

8,725,000

P P A

N s

t s e

u q e

The project will combine standard photovoltaic electricity-generating technology with solar thermal technology in order to power and provide hot water for the City’s Theodore Roosevelt High School. Additionally, the solar panels will track the sun on an axis in order to increase exposure to its rays as it moves across the sky. Wyandotte will convert 11 utility fleet vehicles to American-made, zero-emission hybrid plug in vehicles, and deploy hybrid plug-in infrastructure. Wyandotte must dredge the navigational channel in the Detroit River to allow fuel deliveries to the City’s baseload electric plant. This project involves the deployment of 5 utility-scale wind turbines on an urban brownfield.

R d

Wyandotte, MI

ub

Air Advantage, LLC

T O

Start Date 4/9/2009 3/9/2009 5/9/2009 4/9/2009 6/9/2009 4/9/2009

Expected Completion Date 6/9/2009 4/9/2009 9/9/2009 6/9/2009 10/9/2009 9/10/2009

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to fill in gap coverage that will pass approximately 125,000 customers currently not served in our existing infrastructure footprint. Wireless broadband Internet technology eliminates any impact to the environment while providing a needed service to rural America. 3/1/2009

Submitted Requests - Not Approved

2/28/2014

D VE

Route (Infrastructure Only) Streets Sewer Water Streets Water Sewer Streets / Water / Sewer Sewer

1064 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Air Advantage, LLC

Rural areas of Bay, Midland, Genesee and Shiawassee Counties

Project Name

Wireless Broadband Network Expansion Region 1 & 2

Project Description

Expected Completion Date

Start Date

Air Advantage is a wireless broadband Internet provider serving 4,400 customers in a rural area of Michigan known as the Thumb of Michigan. This project will provide communication towers, customer premise equipment and infrastructure to expand wireless broadband service to a rural region that will pass approximately 155,000 households. This project assumes a 4.5% market share of those homes passed. Wireless broadband internet technology eliminates any impact to the environment while providing a needed service to rural America. 3/1/2009

2/28/2014

Two location possibilities in the City of Bay City. One location possiblity in Bangor Township. All properties owned by Bay Bay County Division on Aging Central County. Kitchen/Center

Bay County

Chain of Lakes Sewer Plant located in Brooks Chain of Lakes Sewer Township Newaygo Authority County, Michigan City of Grayling City of Grayling

Chain of Lakes Sewer Authority Septage Treating Station

City of Jackson

Jackson, MI

Louis Glick Highway

City of Jackson

Jackson, MI

N. Dwight Street

City of Jackson

Jackson, MI

City of Jackson

Jackson, MI

City of Jackson

Jackson, MI

Clay Township

11,146,500

11/10/2009

$

1,200,000

02262009

s t s

April, 2010 11/15/2009

$

9,950,000

P P A

-N

The upgrade of the Chain of Lakes Sewer plant to accept and process household septic waste.Involves the addition of equipment necessary to accept and process houshold septic waste,a building to house equipment, and necessary modifications to the existing sewer plant. July, 2009 Ingham Street Reconstruction 7/1/2009

e u

Water main replacement on state trunkline, Louis Glick Highway & business route M50/US127. Will loop exisitng mains to improve water quality and provide economic development opportunities within the downtown business loop. Replace aged water main to improve water quality and improve fire flows serving community residents

d e t

Maint Garage Expansion

m b u

S

Clay Township

itt

T O

q e R

Expand existing motor pool repair facility. Exisitng facility is too small to accommodate municipal vehicle fleet maintenance. A Mutual Aid Support Initiative & Fire Services Study includes centralizing procurement and repair of emergency service vehcles through this agency. The City of Jackson Motor Pool could service exisiting fleet and additional fleet vehicles from surrounding municipalities.

Roof Replacemnt

Storm Water NPDES Permit requirements, necessitates the construction and installation of storm water components to properly control and discharge storm runoff from the Public Services facilities, which is located along the Grand River. Existing roof on Public Services combination Administration Offices and Motor Pool facilities is in need of replacmenrt.

Colony Drive water main replacement

Replace approximately 4,000 linear feet of existing 3" water main with new 8" watermain. The water line was installed in 1920 and currently serves 75 residents. The water system is privately owned by the residents and has continuous repairs that are very costly to the association. The Township will take ownership and all maintenance for the new water system. 5/10/2009

Storm Water Control

Submitted Requests - Not Approved

D VE $

O R

Bay County Division on Aging is seeking funds to expand central kitchen workspace and equipment. Division on Aging is part of Bay County government, and there are several locations owned or maintained by the County that could be used for the investment. The meals program for senior citizens has grown significantly from the late 1970's, when meal production started at the Bay County Community Center. There are currently ten home delivered meals routes, and approximately 525 senior citizens receive home delivered meals daily. The kitchen staff also produce meals for six other Senior Dining Centers (also delivered by Division on Aging drivers), bringing the total number of meals provided to almost 800 meals per day. While improvements have been made over the years and some equipment has been replaced, there has been no expansion to the kitchen. The staff work small miracles each day to produce 700 to 850 meals in a kitchen that is approximately 700 square Release bids in feet, about the size of a modest garage. Our goal is to identify funding to build a new May. Award job kitchen. Our preliminary drawing is for a facility that includes 5,400 square feet of spa in July 2009.

Funding Request

Route (Infrastructure Only)

10/31/2009

$

Business Route 512,415 M50/US127

$

394,800 N. Dwight Street

$

200,000 N/A

$

100,000 N/A

$

180,000 N/A

$

M-29 to Colony 1,050,000 Drive

1065 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Project Name

Project Description

Start Date

Clay Township

Install approximately 2,000 linear feet of 12” water main as a secondary supply line to Harsens Island. Currently only one line supplies the island for over 2,000 residents. Secondary water main supply line to Harsens Adding the second line would provide a backup if one line is out of service and benefit Island residents with better water pressures and improved fire protection. 8/10/2009

Clay Township

500,000 gallon elevated water storage tank

Construct a new elevated water storage tank on Harsens Island. Currently the island is served by one connection point from the main line water system. The flows and pressures on the island fluctuate throughout the day. A new elevated tank will improve overall delivery and pressure throughout the entire system which includes both Clay Township and the City of Algonac. 8/10/2009

Harsens Island Water main

Install approximately 4 " miles of 12” main line water main with 8” branches to serve residents at the south end of Harsens Island. Currently no water main exists, residents utilize wells, and have no fire protection. Residents would benefit with new hydrants for fire protection and new water service leads, allowing existing wells to be used for watering of lawns. 8/10/2009

River front water main replacement

Replace approximately 1 mile of 3" cast iron water main installed in 1940 with new 8" water line. The water main has no fire hydrants, water quality is poor and residents have complained about "rusty water". Upgrading the water line in this area will improve fire protection, increase overall pressure within the water system, and provide water quality for the residents. 5/10/2009

Clay Township

Sanitary sewer extension on Fruit Road

Install approximately 1 mile of 12” gravity sanitary sewer line. Currently this area, which includes residential, commercial, and industrial homes and businesses, uses septic fields and tanks for sewage treatment.

Clay Township

Upgrade two aging sanitary sewer pump stations and control panels to current Sanitary sewer pump station and control panel technology. Existing sites currently utilize pumps and control panels installed in 1960. upgrades Stations are fully functional but are not energy efficient. 5/10/2009

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

02262009

11/30/2009

O R

D VE $

700,000 M-124 & M-29

1,000,000 M-124

5/30/2010

$

4,125,000 M-124

9/3/2009

$

930,000 M-29

9/1/2009

$

390,000 Fruit Road

6/30/2009

$

Throughout 180,000 Township

Install a new 60 kW pad mounted generator backup system for the Water & Sewer department building. The department currently has a portable 60 kW generator which it uses to operate sanitary sewer lift stations during power interruptions. A permanent generator will allow the Township to maintain services for it's building which benefits the residents of the Township. 5/10/2009

6/15/2009

$

25,000 Ainsworth Street

Install new pump station equipment and control panel. The current equipment is old out dated technology and has far exceeded it's life expectancy. The Township will benefit with lower operational costs. 5/10/2009

6/15/2009

$

90,000 Maria Street

Construct a new 50’ x 60’ storage building for Township equipment, parts, and supplies. Currently all storage is outside exposed to the elements, and is a security issue.

5/10/2009

8/15/2009

$

Sanitary sewer pump station transfer switch installations

Install transfer switches at (11) eleven sanitary pump stations. The current control panels have various styles of receptacle connections for plugging in a portable generator used during power outages. The Township has to rely on the County to help supply temporary power to these pump stations. Upgrading the control panels to uniform receptacles will save money and manpower for both the Township and County. 5/10/2009

6/15/2009

$

Throughout 33,000 Township

Genaw Water main Extension Water main replacement across State Highway M-29

Install approximately 1,200 linear feet of 8" water main. The extension of this section will create a looped system eliminating two dead end water lines. This will benefit the immediate adjacent residents and the Township water supply system overall. 5/10/2009 Replace 180 linear feet of 8" water main across State Highway. The existing main is in poor condition and in need of replacement. 5/10/2009

6/15/2009

$

210,000 Genaw Road

6/15/2009

$

T O

s t s

P P A

-N

5/10/2009

e u

Water and Sewer Department electrical backup system

d e tt

q e R

Maria sewer pump station and control panel upgrades

t i m

Water and Sewer Department storage barn

Submitted Requests - Not Approved

8/31/2010

Funding Request

Route (Infrastructure Only)

$

b u S

Clay Township

Expected Completion Date

240,000 Ainsworth Street

34,000 M-29

1066 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Frankenmuth Youth Sports Association

Clay Township

Clay Township

Clay Township

Clay Township

Clay Township

Project Name Clay Township Downtown Development Authority sidewalk program phase 4

8/31/2009

Clay Township Downtown Development Authority Pedestrian Bridge

Construction of 6' wide by 50' long steel pedestrian bridge with concrete deck. The bridge is part of the sidewalk program and is needed to prevent pedestrians from entering onto the State Highway at a canal crossing. Improvements would also include installation of steel seawall along the existing canal and connections into the new sidewalk. 5/10/2009

9/30/2009

Clay Township Municipal Park

Construct phase 2 and 3 of new Township Park next to the existing municipal offices. Improvements include a tot lot, water park, playground, skating surface, basketball courts, concession area. Township currently has no public park for it's residents to enjoy. 5/10/2009

Clay Township Walking Path

Construction of a 6 mile non-motorized pathway constructed on the shoulder of State Highway M-124. This pathway, when completed will start from the Harsens Island Ferry and end at the D.N.R. public access area. Along the proposed pathway there is a relatively large concentration of homes and businesses. Residents and tourists will have a safe route to the business district and other facilities such as the Island's community park. 8/10/2009

Clay Township Downtown Development Authority sidewalk program phase 5

Construct approximately 4,900 linear feet of concrete sidewalk and storm sewer improvements. This is the final phase of the 3.2 mile program. Currently along this phase there is no sidewalk and pedestrians have to walk on the paved shoulder of State Highway M-29.

Grand Blanc Township Grand Blanc Township Houghton County Road Commission Ripley, Michigan

Salt Storage Building

Houghton County Road Commission Coutny Wide

Plow Truck Purchasing (3 units)

u S

Houghton County Road Commission County Wide

02262009

Start Date

Construct approximately 2,500 linear feet of concrete sidewalk and storm sewer improvements. Currently along this phase there is no sidewalk and pedestrians have to walk on the paved shoulder of the State Highway. 5/10/2009

Frankenmuth/Frankenmut h Frankenmuth Recreation Center

Houghton County Road Commission Coutny Wide Houghton County Road Commission County Wide

Project Description

Expected Completion Date

I-475 Sound Barrier Wall

itt

d e t

bm

$

150,000 M-29

D VE $

96,000 M-29

5/30/2010

$

1,000,000 M-29

6/30/2010

$

850,000 M-124

10/30/2009

$

575,000 M-29

The Frankenmuth Recreation Complex is a multi-use recreation complex supporting indoor and outdoor activities on a year-round basis. This complex will include 4 indoo recreation courts (baskeball/volleyball size), a community swimming pool, indoor & outdoor walking track and path and 10 AYSO soccer fields. The project will provide recreational opportunities supporting Frankenmuth's critical tourism industry. MSU feasibility study suggests 30 new or preserved jobs as a result of this project. 5/1/2009

4/30/2010

$

8,500,000

A precast concrete sound barrier wall located between Hill Road and Reid Road. A significant reduction in noise immediately adjacent to the wall. Due to the north-south linear layout of the Ottawa Hills neighborhood, approximately 50% of the approximately 350 households in Ottawa Hills would benefit from reduced noise and increased property values. May, 2009

July, 2009

$

5,000,000

Capital Investment for Houghton Road Commission Salt Storage Building @ $500,000Now

Spring 2009

$

500,000 All Routes

Replace plow trucks with more efficient and environmentall friendly equipment & Capital Investment for Houghton Road Commission in 3 plow trucks @ $600,000

Spring 2009

$

600,000 All Routes

Spring 2009

$

400,000 All Routes

Spring 2009

$

130,000 All Routes

Spring 2009

$

125,000 All Routes

T O

s t s

-N

6/10/2009

e u

q e R

Immediate

Dozer Purchase

Patrol/light duty truck Purchase

Replace Patrol/light duty trucks with more efficient and environmentall friendly equipment & Capital Investment for Houghton Road Commission in 5 @ $125,000

Submitted Requests - Not Approved

O R

P P A

Replace Loaders with more efficient and environmentall friendly equipment & Capital Investment for Houghton Road Commission in 2 Loaders @ $400,000 Immediate Replace Dozer with more efficient and environmentall friendly equipment & Capital Investment for Houghton Road Commission in 1 Dozer @ $130,000 Immediate

Loader Purchase (2 units)

Funding Request

Route (Infrastructure Only)

Immediate

1067 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Newaygo County

Pokagon Township

Grant or Newaygo

Pokagon Township

Project Name

Project Description

Expected Completion Date

Start Date

New Adult Foster Care Home

Construction of an Adult Foster Care home in the County of Newaygo that will be handicap accessible, and reduce the need for Nursing home admissions in the County. The new AFC home will allow persons with developmental disabilities to live in the community, and provide services and supports to them . Approximately 10-15 jobs are created for each AFC home, depending on the needs of the residents. Approximately 7 full time jobs, and 6 part time jobs will be created. The architectural drawings have been completed, and upon location of a site, construction can begin. This project will create jobs through the brick and mortar construction process, as well as on-going jobs for services to the persons who reside in the home. Spring 2009

Township Hall Improvements

The existing Township Hall was a two room schoolhouse that was converted to the Township Hall. The building has had minimal improvements since it's original construction. The 1,800 sft hall is used for all administrative purposes, township meetings and elections. The entry doors do not meet ADA accessibility requirements and the original tile floor likely contains asbestos and is deteriorating. The proposed project includes replacing the three exterior doors with insulated doors that meet current ADA requirements along with removing and replacing the existing floor with a combination of carpet and new tile. These improvements would increase the energy efficiency of the structure, provide barrier free access to the facility and replace the deteriorating flooring. 5/1/2009

Corrections Facility Renovation Project

The Sanilac County Sheriff's Correctional Facility rents bed space to the U S Marshals Service. These Federal Inmates include suspected Terrorists, Illegal aliens, and Major Drug Dealers. The facility has a classification deficiency which requires some major renovations. An Addition to the present facilitity would remedy this deficiency. Presently we are planning an addition of approximately 10,000sq feet, and renovating other areas in the facility. This will not only make the facility more secure to the community but increase our ability to better serve the US Marshals Service by housing up to an additional 64 inmates. This project will also improve the local Infrastructure by creating additional Governmental Employment Opportunities including hiring additional staff, Stimulate the Local Economy through purchasing Building Supplies, and employing the private sector work force to do the construction work. February 12,2009 February 12,2010

T O

s t s

O R Fall, 2009

Funding Request

D VE $

Route (Infrastructure Only)

320,000

P P A

-N

6/1/2009

$

19,000 NA

e u

Sanilac County

City of Sandusky, Michigan

South Oakland County Resource Recovery Authority Troy

d e t

Build construction and demolition processing 40 tons/per day of private customer demolition waste are delivered to SOCRRA. A facility adjacent to the MRF for salvaging processing facility will allow the separation of extraneous yard waste, wood, OCC, recyclables plastic and other recyclable debris.

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

6/1/2009

6 months from funding

Chapel Rd Water Extension (15,840 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

90 days from start date

Spring Arbor Rd Water Extension (2,000 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

King Rd Water Extension (2,900 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

King Rd Water Extension (2,900 Ft.)

itt

m b u

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

S

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI Spring Arbor Twp Spring Spring Arbor Township Arbor, MI Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

02262009

q e R

Richard St extension

$

$

Addition to Jail 5,000,000 Facility

500,000

$

Chapel Rd from Michigan Ave to 1,030,000 Parks Dr.

90 days from start date

$

Spring Arbor Rd from Melody to 240,000 Cottage

210 days from project approval

90 days from start date

$

King Rd from 189,000 Elwood to Chapel

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

90 days from start date

$

King Rd from Daggit to Dearing 260,000 Rd

This extension will relieve congestion at several intersections on Spring Arbor Rd.

180 days from project approval

180 days from start date

$

Extend Richard from Wakefield to 125,000 Dearing Rd.

Submitted Requests - Not Approved

1068 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Project Name

Project Description

Traffic light at Spring Arbor Rd and Dearing Rd.

Expected Completion Date

Start Date

This is a very busy intersection that will benefit greatly from a traffic control light

180 days from project approval

180 days from start date

Cap and add bike lane to improve safety for University and senior citizen housing development residents.

90 days from project approval

60 days from start date

Arbor Hgts, Ogle, and Cottage St. Upgrade

Cap and add bike lane to improve safety for University and senior citizen housing development residents.

90 days from project approval

60 days from start date

Second St. pedestrian path

Pedestrian path will provide safe passage for joggers and walkers from the University 90 days from and senior citizen development project approval

60 days from start date

T O

P P A

Falling Waters Trail Access

Add pedestrian / bike path to provide safe access to a very popular non-motorized trail

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Dearing Rd Walking / bike path

Add pedestrian / bike path to provide safe passage to Western secondary schools from Spring Arbor and FW Trail. Used by students walkers, joggers, school sport teams.

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

King Rd / Spring Arbor Rd Intersection redesign

Tuscola Area Airport

Indianfields Township

Taxilane reconstruction

Tuscola Area Airport

Indianfields Township

Purchase of Snow Removal Equipment

Tuscola Area Airport

Indianfields Township

Demolition of Old Administration Building

s t s

-N

King Rd intersects with Spring Arbor Rd at a sharp angle which creates a hazzard for persons using this route The northeast taxilane is in very poor condition. Reconstruction is required to provide safe access from hangars to airfield pavements. The present snow removal equipment is obsolete. This presents a challenge to keep the runways clean and safe for the pilots. The old administration building is located in the runway protection zone for a proposed runway and needs to be demolished.

e u

eq

e t tt

R d

The airport has a problem with deer coming onto airport property and the runway. This makes for a threat to pilots and to planes. Security fencing along the west propery line will solve this problem. Three buildings to be purchased by the airport need major improvements. They could be used for aviation training and for storage of airport property. Building Renovatiions to LEED Silver Certified building: 50kW Solar Array, Energy Monitoring System, Skylights Building Renovatiions Energy Conservation: New HVAC System, Energy Monitoring System, Insulation, 10kW Solar Array, Tankless Water heater Building Renovatiions Energy Conservation: Insulation, Building Monitoring System, Energy Monitoring System, Tankless Water Heater Building Renovatiions Energy Conservation: Skylights, Lighting Upgrade, Tankless Water Heater Building Renovatiions Energy Conservation: Skylights, Lighting Retrofit, Energy Monitoring System, Tankless Water Heater Building Renovatiions to LEED certified building: 10kW Solar Array

90 days from project approval

$

Alter configuration of intersection and install traffic control 100,000 light

$

Second St from Chapel to Henderson (4,400 374,000 Ft.)

$

Arbor Hgrs, Ogle, and Cottage St. 340,000 (4,000 Ft.)

$

Second St. from Ogle to Henderson 147,000 (4,200 Ft.)

$

Teft Rd from Spring Arbor Rd to FW Trail (9,800 392,000 Ft.)

D VE

Second St. Upgrade

O R

Funding Request

180 days from start date

90 days from project approval

180 days from start date

$

Dearing Rd from Michigan Ave. to Dearing Rd. 655,000 (16,400 Ft.)

180 days from project approval

180 days from start date

$

200,000

5/1/2009

10/31/2009

$

140,000

5/1/2009

10/31/2009

$

175,000

5/1/2009

10/31/2009

$

33,000

5/1/2009

10/31/2009

$

325,000

6/1/2009

10/31/2010

$

595,000

6/1/2009

6/1/2010

$

517,000

6/1/2009

6/1/2010

$

255,000

6/1/2009

6/1/2010

$

105,000

6/1/2009

6/1/2010

$

78,000

6/1/2009 6/1/2009

6/1/2010 6/1/2010

$ $

245,000 100,000

Tuscola Area Airport

Indianfields Township

Security Fencing

Tuscola Area Airport

Indianfields Township

Building Rennovation

DEQ

Warren

DEQ Southeast Michigan District Office

DEQ

Cadillac

DEQ

Kalamazoo

DEQ

Lansing

DEQ DEQ

Gwinn Bay City

DEQ

Auburn Hills, Oakland Co Wastewater

NPS; 4 city owned properties

$

300,000

DEQ

Auburn Hills, Oakland Co Wastewater

NPS- Galloway Cr

$

1,735,000

02262009

i m

ub

DEQ Cadillac District Office DEQ Kalamazoo District Office

S

DEQ Filley St Warehouse DEQ UP District Office DEQ Saginaw Bay District Office

Submitted Requests - Not Approved

Route (Infrastructure Only)

1069 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township DEQ Maybee, Monroe Co DEQ Marysville, St Clair Co Howard City, Montcalm DEQ Co Iron Mountain, Dickinson DEQ Co Sheridan Twp, Newago DEQ Co DEQ Elba Twp, Lapeer Co

Wastewater Wastewater

Lagoon Impr; MH Rehab SCADA, Solids Hand Imps

$ $

Funding Request 155,000 1,715,000

Wastewater

WWTP/PS Upgrd; Swr Repl;Outfl

$

2,180,000

Wastewater

PS Repl/Impr; Swr Repl

$

970,000

Wastewater Wastewater

Swr Ext (Fremont Lake) WWTP Impr

$ $

2,600,000 1,510,000

DEQ DEQ DEQ DEQ DEQ

Wastewater Wastewater Wastewater Wastewater Wastewater

New WWTP/CS (Cedar) CSO; Swr Sep SSO: WWTP/PS/Intcp Imp/EQ Basin I/I Removal; Lift Station Impr Lift Station/FM Repl

$ $ $ $ $

1,340,000 1,200,000 6,440,000 2,255,000 345,000

Wastewater

Storm Water BMPs (Pioneer HS)

$

4,415,000

$ $

2,130,000 1,640,000

$ $

2,535,000 370,000

$

6,340,000

$

770,000

$

1,410,000

Repl mains/looping Repl mains (21st St, Phase 1)

$ $

4,980,000 7,250,000

Repl mains (Mansfield St)

$

655,000

Repl mains (Phase 2)

$

485,000

Trans upgrades (Phase 1) Repl mains/WTP repair/ strg tank repair (Phase 1)

$ $

2,170,000 5,365,000

Repl mains; strg imp

$

10,970,000

New wellfield/strg/trans main Repl mains (N. Hewitt Rd.) Repl mains (Stone St, Phase 2)

$ $ $

5,185,000 380,000 375,000

Rpl mains/looping Repl/rehab mains; looping (Phase 2) New Intake New well/trans/control bldg; strg/meter upgrd Repl mains (Phase 1)

$ $ $ $ $

6,795,000 4,955,000 7,415,000 2,465,000 3,025,000

Project Name

Project Description

DEQ

Solon Twp, Leelanau Co St Joseph, Berrien Co Grand Ledge, Eaton Co Iron River, Iron Co Crystal Falls, Iron Co Allen's Creek DD, Ann Arbor

DEQ DEQ

Auburn Hills, Oakland Co Wastewater Wastewater Orion Twp, Oakland Co

Swr Rehab Swr Rehab

DEQ DEQ

Shelby Twp, Macomb Co Wastewater Huron Twp, Wayne Co Wastewater Ecorse Ck PAD, Dearborn Hts/Taylor Wastewater

Swr Rehab Swr Rehab

Wastewater

PS Upgrd

Drinking Water

Water sys impr (Phase 1)

DEQ DEQ

Grosse Pointe, Wayne Co Benton Harbor, Berrien Co Van Buren Twp, Wayne Co Port Huron, St Clair Co

DEQ

Ypsilanti, Washtenaw Co Drinking Water

DEQ

Lansing Twp, Ingham Co Drinking Water Brownstown Twp, Wayne Co Drinking Water Drinking Water Howell, Livingston Co

DEQ DEQ DEQ

DEQ DEQ DEQ

Drinking Water Drinking Water

t i m

d e tt

q e R

DEQ DEQ DEQ DEQ DEQ DNR

T46N R8W & T47N R8W Road improvement

Charcoal Grade Lift and Cap

DNR

T45N R10W

Sec 34 Road Fill and Cap

b u S

02262009

Road improvement

O R

T O

P P A

-N

e u

New Haven, Macomb Co Drinking Water Marquette Twp, Marquette Co Drinking Water Drinking Water YCUA, Washtenaw Co Port Huron, St Clair Co Drinking Water Van Buren Twp, Wayne County Drinking Water Monroe, Monroe Co Drinking Water St Joseph, Berrien Co Drinking Water Buchanan, Berrien Co Drinking Water Dearborn, Wayne Co Drinking Water

DEQ DEQ DEQ

s t s

Taylor Basin/Jackson PS Upgrades

Start Date

Expected Completion Date

Submitted Requests - Not Approved

120 days from funding 120 days from funding

1 year from funding 1 year from funding

D VE

Route (Infrastructure Only)

$

200,000 TE

$

100,000

1070 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

DNR

Traverse City

Road improvement

Traverse City road repairs

DNR

Gladwin

Road improvement

Compartment 120&124 road repairs

DNR

Grand Traverse

Road improvement

Walters Road road repairs

DNR

T20N, R2W, Sec 9

Road improvement

Improve access and safety of road to campground and Gladwin Field Trail Area.

DNR

T46N R17W Sec. 8

Road improvement

Reshape and gravel road

DNR

Mahoney Lake Road

Road improvement

Reshape and gravel road

DNR

T45N R9W

Road improvement

McLeod Road Grade and Gravel Cap

DNR

T46N R10W

Road improvement

Camp 6 Road Grade and Gravel Cap

DNR

T48N R8W

Road improvement

Camp 7 Road Grade and Gravel Cap

DNR

T48N R8W

Road improvement

Camp 7 Road Cut across Lift and Cap

DNR

T50N R6W

Road improvement

Widewaters Road Fill and Cap

DNR

T50N R6W

Road improvement

Goose Marsh Road Fill and Cap

DNR

T49N R10W

Road improvement

Chris Brown Lake Road Grade and Gravel Cap

DNR

T49N R10W

Road improvement

Shamrock Road Grade and Gravel Cap

DNR

T49N R10W

Road improvement

Rabbit Patch Road Grade and Gravel Cap

DNR

T49N R10W

Road improvement

Coast Guard Road Grade and Gravel Cap

DNR

S 4, 5,8,17 T41N R29W

Road improvement

DNR

S 5,6,7 T 41N R29W

Road improvement

DNR

S 32,33 T41N R29W

Road improvement

DNR DNR

T43N R8W sec. 19 Road improvement T45N R1W sec 6,7 T45N Road improvement R2W sec. 1,2

DNR

T43N R1W sec 19, 30

DNR

Gwinn Unit

DNR

Gwinn Unit

DNR

Gwinn Unit

DNR

Gwinn Unit Wexford Co., Clam Lake Twp.

DNR

eq

02262009

S

s

O N

R d

South Pond Road road repairs

e t t

it

m b u

A T

st

e u

Start Date 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from funding 120 days from receipt

West Pond road road repairs

Carney Lake Rd road repairs Flowing Well Road - gravel, culvert replacement

Spile Dam Road - gravel, replace culverts, bridge repair

Road improvement

South Taylor Cr. Easement - gravel, culvert, reroute

Road improvement

Upgrade Little West Road

Road improvement

Watson Cut across Road upgrade

Road improvement

General Road Maintenance FY 09

Road improvement

Upgrade Squaw Lake Road

Cadillac OSC

Repave accessible parking lot and drive way

Submitted Requests - Not Approved

Expected Completion Date 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding

PP

O R

Funding Request $

50,000

$

40,000

$

50,000

$

220,000

$

80,000

$

100,000

$

60,000

$

75,000

$

150,000

$

60,000

$

75,000

$

100,000

$

75,000

$

75,000

$

40,000

$

150,000

$

48,000

$

40,000

$

78,000

$

30,000

$

75,000

$

10,000

$

50,000

$

5,000

$

8,000

$

5,000

$

175,000

D VE

Route (Infrastructure Only)

1071 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

DNR

Atlanta

Office Facilities

Atlanta-renovate using LEED standards / ADA Compliance

DNR

Sec. 7 T26N R13W

Office Facilities

Platte River Office-renovate using LEED standards / ADA Compliance

DNR

Sec. 7 T26N R13W

Garage / Storage Buildings

Platte River Storage Building 40x40 (1600 sq ft), 14ft doors

DNR

Garage / Storage Buildings 621 N 10th Street, Plainwell, MI 49080 Garage / Storage Buildings 1836 M-32 West, Gaylord, MI 49735 Garage / Storage Buildings

DNR DNR

Kalkaska Storage Building 40x80 (3200 sqft), 14Ft doors Plainwell Storage Building 32x32 (1024 sqft), 12Ft doors Gaylord Repair Shop Storage Building 40x120 (4800 sqft), 14Ft doors

DNR

8717 N Roscommon Rd., Roscommon, MI 48653 Garage / Storage Buildings 9870 W Stoll Rd., Haslett, MI 48840 Garage / Storage Buildings 5995 Chilson Rd., Howell, MI 48843 Garage / Storage Buildings

Brighton Storage Building 40x80 (3200 sqft), 14Ft doors

DNR

Atlanta

Garage / Storage Buildings

Atlanta Storage Building 40x80 (3200 sqft), 14Ft doors

DNR

Indian River

Garage / Storage Buildings

Indian River Storage Building 40x80 (3200 sqft), 14Ft doors

DNR

PRC

Garage / Storage Buildings

Pigeon River Storage Building 40x40 (1600 sqft), 14Ft doors

DNR

Twin lakes field office

Office Facilities

new roof

DNR

Baldwin

Garage / Storage Buildings

Baldwin Storage Building 40x80 (3200 sqft), 14Ft doors

DNR

Escanaba FMU office

Office Facilities

DNR

Stephenson Field Office

Garage / Storage Buildings

DNR

Wyman Field Office

Garage / Storage Buildings

DNR

Seney Field Office Shingleton Heated Garage

Garage / Storage Buildings

Garage / Storage Buildings

Add cement apron for overhead door

Garage / Storage Buildings

Install 20 concrete aprons front and rear fire shop

DNR

Crystal Falls Fire shop Shingleton Heated Garage

Garage / Storage Buildings

Roof Replacement

DNR

Shingleton Garage

Garage / Storage Buildings

Add lighting & outlets, partition, insulate, &heat 2 stalls

DNR

Sault Ste. Marie

Garage / Storage Buildings

40x80 cold storage

DNR

Crystal Falls Fire shop

Garage / Storage Buildings

Contract install 4 new overhead garage doors with electric openers

DNR

DeTour Village

Garage / Storage Buildings

40x80 cold storage

DNR

Gwinn Unit

Garage / Storage Buildings

192 X 32 cold storage garage at Gwinn FO

DNR

Gentz Property

Bridge

Bear Creek RR Grade Bridge

DNR DNR

DNR DNR

st

e u

q e R

s

O N

d e t

Construct a 50'X100' cold storage building New fire garage

Cold Storage for Seney fire equipment 40x60

Submitted Requests - Not Approved

O R

PP

180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding

A T

Rose Lake Storage Building 40x80 (3200 sqft), 14Ft doors

Remove and replace shingle on FMU bldg

ub

S

02262009

tt i m

Storage Building 40x80 (3200 sqft), 14Ft doors

Start Date 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding

Expected Completion Date 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding

1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding

Funding Request

Route (Infrastructure Only)

$

50,000

$

30,000

$

80,000

$

160,000

$

51,200

$

240,000

$

160,000

$

160,000

$

160,000

$

160,000

$

160,000

$

80,000

$

75,000

$

160,000

$

43,000

$

250,000

$

687,500

$

120,000

$

10,000

$

7,000

$

10,000

$

65,000

$

160,000

$

22,000

$

160,000

$

308,000

$

250,000 TE

D VE

1072 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

DNR

Emmett and Van Buren

Oden Fish Hatchery

DNR

Lapeer

Ortonville Shooting Range / Perimeter Fence Construct fencing around entire shooting range for safety

DNR

Syers Creek Bridge

Bridge

Syers Creek Bridge

DNR

T42N R12W sec 12

Road improvement

Frank's Bridge - Place gravel ford in Scham's Cr.

DNR

Rainbow Bend SFCG

State Forest Campgrounds

Rainbow Bend & Castle Rock Canoe Launches

DNR

Gwinn Unit

State Forest Campgrounds

Upgrade 6 LPI cabins to LP gas heat

DNR

Trails

Presque Isle Pathway and Overlook

DNR

Harlow Lake Roscommon Sec. 16 T24N R2W

Building Removals

Roscommon Cons. Airport

DNR

Stephenson Field Office

Office Facilities

Remove and replace pavement at Steph. FO*

DNR

East Br. Ontonagon

Bridge

Repair structure, replace deck and railing systems

DNR

Jumbo River

Bridge

Repair structure, replace deck and railing systems

DNR

Baltimore River

Bridge

Repair structure, replace deck and railing systems

DNR

Middle Br. Ontonagon

Bridge

Repair structure, replace deck and railing systems

DNR

Repair structure, replace deck and railing systems

DNR

S.Br. Ontonagon Bridge Escanaba to Hermansville Grade Trails

DNR

Various

Culverts and Road repair

DNR

DNR

T42N R1W sec.16, 17 Road improvement T38N R24W Sec's 14, 23, 26, 35 Road improvement EB Fox River & Canoe Lake CG State Forest Campgrounds

DNR

Clinton Co., Bath Twp.

DNR

Naubinway, MI

DNR

Baraga, MI

DNR DNR

T50N R6W T44N R9W sec.11,12,14,23

DNR

T44N R1W secs 6, 7, 8, 9, and 10; T45N R1W sec. 31.

DNR DNR

DNR

10 station Archery Shooting Range

s

st

e u

it

m b u

O N

Bay City Lake Lower Road - culverts, gravel - RDR Purchase, haul, spread, and grade gravel for 3.5 miles Improve entrance roads Pave accessible Parking Lot

Naubinway Field Office-1

Energy efficient roof replacement

Baraga OSC Storage Building-1

Energy efficient roof replacement

Road improvement

Doe Lake Road road repairs

Road improvement

Cranberry Lake Road - gravel, geogrid, culvert replacement

Road improvement

20 Mile/West Perimeter Road/Big Pine Road - Crown, Ditch, fill holes, and Gravel 12'X6"

UP Wide

Road improvement

UP Trail/Route Grading

Emmett

Oden Fish Hatchery

Build accessible office space and teaching classroom.

S

02262009

2 years from funding 2 years from funding 2 years from funding

A T

R d

e t t

Rose Lake Field Office

eq

120 days from funding 120 days from funding 180 days from funding

O R

Redeck bridges on newly acquired RR grade

Bridge

Start Date 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from receipt 90 days after funds received 90 days after funds received 120 days from funding 120 days from funding

Expected Completion Date 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 1 year from funding 180 days from funding 180 days from funding 2 years from funding 2 years from funding

Submitted Requests - Not Approved

PP

Funding Request $

40,000

$

40,000

$

235,000

$

25,000

$

110,000

$

12,000

$

50,000

$

20,000

$

40,000

D VE

Route (Infrastructure Only)

$

625,000 TE

$

450,000 TE

$

740,000 TE

$

835,000 TE

$

740,000 TE

$

50,000 TE

$

50,000

$

10,000

$

75,000

$

30,000

$

90,000

$

60,000

$

100,000

$

100,000

$

160,000

$

225,000

$

175,000

$

300,000

1073 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name Island Lake Shooting Range / Education Building Rose Lake Shooting Range / Education Building Sharonville Shooting Range / Education Building Bald Mountain Shooting Range / Pit Toilet Building Pontiac Lake Shooting Range / Pit Toilet Building Bald Mountain Shooting Range / Storage Building Wolf Lake/Oden Fish Hatcheries-adjacent to Visitor Center

DNR

Livingston

DNR

Clinton

DNR

Jackson

DNR

Oakland

DNR

Oakland

DNR

Oakland

DNR DNR

Van Buren and Emmett Roscommon Sec. 17 T24N R2W

Replace old facility

DNR

Manton

Replace old office

DNR

Standish

Replace old office

DNR

Sanford

Replace old office

DNR

Mio

Replace old office

DNR

5666 S M-123, Newberry Office Facilities

DNR

Sault Ste. Marie

Office Facilities

DNR

Naubinway

Office Facilities

Project Description

Start Date 180 days from Construct educational building funding 180 days from Construct new educational building funding 180 days from Construct new educational building funding 180 days from Construct new pit toilet near the rifle shooting range funding 180 days from Construct new pit toilet near the rifle shooting range funding 180 days from Construct new pole barn for storage of sporting clay equipment funding 180 days from Education activities / program pavilion funding 180 days from Forest Fire Experiment Station-replace existing 80 year old facility funding 180 days from Manton-New Field Office/10 People - replace existing 50 year old facility - build/designfunding 180 days from Standish-New Field Office/2 People - replace existing 50 year old facility - build/designfunding 180 days from Sanford-New Field Office/2 People - replace existing 50 year old facility - build/design funding 180 days from Mio-New Field Office/4 People - replace existing 50 year old facility - build/design funding 180 days from Construct new Newberry Field Office/Heated Shop - build/design funding 180 days from Replace Field Office - replace existing 50 year old facility -build/design funding 180 days from Replace Field Office - build / design funding

A T

st

e u

eq

s

DNR

7550 E. Messinger Rd.Twin Lake, MI 49457 Office Facilities 4590 118th Ave., Allegan, Office Facilities MI 49010

DNR

9870 W. Stoll Rd., Haslett, MI 48840

Office Facilities

DNR

Seney Field Office

Office Facilities

DNR

Shingleton Garages

Office Facilities

DNR

Thompson fire garage

Office Facilities

DNR

5666 S M-123, Newberry Garage / Storage Buildings

Construct new Newberry 80'x153' cold storage garage

DNR

Norway Field office

Garage / Storage Buildings

Norway- Engineer and construct heated 60x80 building

DNR

Sault Ste. Marie

Garage / Storage Buildings

40x80 heated storage

DNR

Naubinway

Garage / Storage Buildings

120x60 heated storage

DNR

Baraga

Baraga Building

Construct Storage Building

DNR

it

m b u

S

02262009

Muskegon Field Office-office addition, bring restroom up to ADA, heat in Garage. FMFM, Fish and LED staff

2 years from funding 2 years from funding

Rose Lake-reseal roofs on both buildings, bring office area and restroom up to ADA, hoist replacement, fence storage area for GSA Equipment, parking lot improvements Trusses & roof for Seney office/garage; renovate using LEED standards / ADA Compiance

2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

Trusses & roof for Shingleton garages Replacement roof

Submitted Requests - Not Approved

180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding

Funding Request $

75,000

$

250,000

$

250,000

$

25,000

$

25,000

$

50,000

$

60,000

$

2,300,000

$

285,000

$

137,000

$

137,000

$

174,000

$

537,500

$

190,000

$

190,000

$

125,000

$

20,000

$

220,000

$

125,000

$

135,000

$

85,000

$

615,000

$

800,000

$

400,000

$

900,000

$

250,000

D VE

180 days from funding 180 days from Allegan Field Office-bring office and restroom up to ADA and additional office space. funding

R d

e t t

O R

PP

O N

Expected Completion Date 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

Route (Infrastructure Only)

1074 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency DNR DNR

Plainwell Slagle Twp - Harrietta Field Office

DNR

Goose Creek SFCG

DNR

Military Hill

DNR

Statewide Petoskey to Mackinaw City State Trail Ionia to Owosso State Trail Alpena to Mackinaw City State Trail

DNR DNR DNR DNR

DNR

Rogers City Trail Spur Alpena to Hillman State Trail Mackinaw City Surface Improvement

DNR

Millersburg Trailhead

DNR

Gwinn Unit

DNR

Van Buren

DNR

Oakland

DNR

Jackson

DNR

Clinton

DNR

Oakland

DNR

Clinton

DNR

Emmett

DNR

Oakland

DNR

Luce

DNR

Oakland

DNR

Lapeer

DNR

Oakland

DNR

Oakland

DNR

Various

DNR

02262009

Project Name

Project Description

Start Date 180 days from Plainwell Building Construct lab/office/storage facility for Plainwell Operation Service Center funding 180 days from Harrietta Field Office Construction lab/office/storage facility for Central Lake Michigan Management Unit. funding 180 days from Bridge Shore to Shore Bridge Construction funding 180 days from Bridge Replace bridge abutments and bridge structure funding 180 days from Trails 600 miles rail-trail surface improvements funding 180 days from Trails 32 miles rail-trail surface improvements funding 180 days from Trails 49 miles rail-trail surface improvements funding 180 days from Trails 71 miles rail-trail surface improvements funding 180 days from Trails 12 miles rail-trail surface improvements funding 180 days from Trails 22 miles rail-trail surface improvements funding 180 days from Trails 5 miles of rail-trail surface improvements funding Trailhead amenities; parking, bathrooms, information center, picnic shelter / warming 180 days from Trails hut funding 180 days from Trails Rec trail bridge over Chocolay trail funding 180 days from Wolf Lake Fish Hatchery-Dike adjacent trail Build a paved accessible trail system-1 mile. funding Pontiac Lake Shooting Range / Shotgun 180 days from Range Perimeter Fence Construct fencing around entire shooting range for safety funding Sharonville Shooting Range / 7 & 200 Yard 180 days from Range Construction Construct new seven yard and 200 yard shooting range funding Rose Lake Shooting Range / Shotgun 180 days from Patterning Range Construct new shotgun patterning range funding Bald Mountain Shooting Range / Sporting 180 days from Clays Course Construct new shotgun sporting clay course funding Rose Lake Shooting Range / Sporting Clays 180 days from Course Construct new shotgun sporting clay course funding 180 days from Oden Fish Hatchery Create and install a fishing pier. funding Bald Mountain Shooting Range - Trap/Skeet 180 days from Range Renovations Demolish and rebuild trap/skeet shotgun range funding 180 days from Newberry Shooting Range Expand existing shooting range funding Bald Mountain Shooting Range / Entrance 180 days from Drive Renovations Pave existing gravel roadway to shooting range funding Ortonville Shooting Range / Entrance Drive 180 days from and Parking Lot Pave roadway and parking lot at shooting range funding 180 days from Bald Mountain Shooting Range Renovate shooting range funding Bald Mountain Shooting Range / Parking Lot 180 days from Renovations Re-surface existing parking lot to shooting range funding State Game and State Forest Shooting Range Upgrade 12 State Game and State Forest Area unofficial gravel pit-type shooting 180 days from Development ranges to make safer and more accessible. funding

A T

e u

st

eq

S

R d

e t t

it

m b u

s

O N

Submitted Requests - Not Approved

Expected Completion Date 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

PP

O R

Funding Request

Route (Infrastructure Only)

$

1,150,000

$

250,000

$

530,000 TE

$

2,160,000 TE

$

48,505,000 TE

$

3,840,000 TE

$

12,000,000 TE

$

3,120,000 TE

$

600,000 TE

$

990,000 TE

$

900,000 TE

$

500,000 TE

$

350,000 TE

$

106,000

$

40,000

$

800,000

$

45,000

$

250,000

$

250,000

$

150,000

$

250,000

$

400,000

$

72,000

$

120,000

$

80,000

$

157,000

$

1,000,000

D VE

1075 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township ORV / Snowmobile DNR Bridges

Bridge

Bridge engineering and design and / or construction

DNR

Townline Creek

Bridge

Replace bridge abutments and bridge structure

DNR

West Twin Creek

Bridge

Replace bridge abutments and bridge structure

DNR

E.Twin Creek

Bridge

Replace bridge abutments and bridge structure

DNR

Little Manistee

Bridge

Replace bridge abutments and bridge structure

DNR

Chase Creek

Bridge

Replace bridge abutments and bridge structure

DNR

Flower Creek

Bridge

Replace bridge abutments and bridge structure

DNR

Morrisey Creek

Bridge

Replace bridge abutments and bridge structure

DNR

Prudenville

Bridge

Replace bridge abutments and bridge structure

DNR

Denton Trail

Bridge

Replace bridge abutments and bridge structure

DNR

Gooseneck creek

Bridge

Replace bridge abutments and bridge structure

DNR

Silver River

Bridge

Replace bridge abutments and bridge structure

DNR

Sec. 27 T27N R 13W

Bridge

Lost Lake Connector Bridge

DNR

T19N, R6W, Sec 16/17

Bridge

In partnership w/County Road Commission, replace a closed bridge

DNR

T51NR30W sec. 1

Bridge

replace failing bridge Chinks Creek; Baraga unit

DNR

T47N R15W Sec. 11

Bridge

Stanley Lake Bridge

DNR

T46N R17W Sec. 29

Bridge

DNR

T46N R18W SEC 27

Bridge

DNR

T42N R1W sec. 15

Bridge

DNR

T42N R1E sec.29

Bridge

DNR

T48N R8W

DNR DNR

S 13 T40N R29W T43N R6E sec. 2,3,1113,24-26,35

DNR

Calumet to Copper Harbor Road improvement

Keweenaw Trail Construct

DNR

Road improvement

Forest Islands Trail Const.

DNR

Cedar River Keweenaw tip…State ownership

Road improvement

See KPAC recommendations/various rd/bridge

DNR

Groveland Mine

Boat Access Sites

Island BAS

Project Description

eq

s

st

e u

O N

R d

it

e t t

m b u

Doty Bridge bridge

Hessel Cr. Bridge replacement and approaches

Beavertail Bridge - remove culverts and replace Halifax Road Bypass Construction

Road improvement

Casssidy Creek Road road repairs

Road improvement

Carp River TT - gravel, geogrid road repair

Start Date 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding

A T

Shingleton snowmobile bridge

Road improvement

S

02262009

Project Name

Submitted Requests - Not Approved

Expected Completion Date 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

PP

O R

Funding Request $

1,000,000

$

275,000

$

300,000

$

200,000

$

335,000

$

475,000

$

225,000

$

320,000

$

305,000

$

225,000

$

210,000

$

320,000

$

50,000

$

250,000

$

300,000

$

360,000

$

720,000

$

525,000

$

200,000

$

200,000

$

150,000

$

320,000

$

300,000

$

100,000

$

35,000

$

2,535,000

$

118,200

D VE

Route (Infrastructure Only)

1076 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

DNR

Groveland Mine

Boat Access Sites

East Pond BAS

DNR

West Pond BAS

DNR

Groveland Mine Boat Access Sites Mouth of the 2 Hearted River SFCG Boat Access Sites Lake Perrault T54NR35W s34 Boat Access Sites

DNR

BAS's in District 1: Andrus Lake SFCG, Avery Lake SFCG, Bass Lake SFCG (Marquette), Beaufort Lake SFCG, Black Lake SFCG, Bodi Lake SFCG, Culhane Lake, Jones Lake SFCG, King Lake SFCG, Parmelee Bridge SFCG, Perch Lake SFCG, Pickerel Lake SFCG (Otsego Co.), Boat Access Sites

DNR

BAS's in District 2; Baxter Bridge SFCG, Big Leverentz Lake SFCG, Lake Ann SFCG, Lincoln Bridge SFCG, Long Lake SFCG (Wexford), Old U.S. 131 SFCG, Spring Lake SFCG Boat Access Sites

DNR

Boat Access Site Redevelopment upgrade access site (ADA) add toilet

O R

-N

e u

DNR

Hopkins Creek SFCG

DNR

Bass Lake SFCG

DNR

Big Lake SFCG

DNR

itt

s t s

q e R

d e t

m b u

Site upgrades - design /build Shoreline/Campground Restoration Campground and BAS Redevelopment

State Forest Campgrounds

Trail Camp & Equestrian Development

State Forest Campgrounds

Campground Redevelopment

State Forest Campgrounds

Campground Redevelopment

Lake Dubonet SFCG

State Forest Campgrounds

Fishing Pier Replacement

DNR

Black Lake SFCG

State Forest Campgrounds

DNR

Goose Creek SFCG

State Forest Campgrounds

Pier Replacements Trail Camp development, equestrian, Canoe launch, shore to shore trail relocation, campground redevelopment design / build

S

02262009

Submitted Requests - Not Approved

Funding Request $

168,351

$

190,340

$

196,900

$

100,000

D VE

Route (Infrastructure Only)

P P A

Site upgrades - design /build

DNR

DNR

T O

Site upgrades - design /build

BAS's in District 4; Guernsey Lake SFCG, Goose Lake SFCG, Lake Dubonnet SFCG, Pickerel Lake SFCG (Kalkaska), Reedsburg Dam SFCG Boat Access Sites Mouth of the 2 Hearted River SFCG State Forest Campgrounds Tomahawk Creek SFCG West Unit State Forest Campgrounds

DNR

Start Date 180 days from funding 180 days from funding 180 days from funding 180 days from funding

Expected Completion Date 2 years from funding 2 years from funding 2 years from funding 2 years from funding

180 days from funding

2 years from funding

$

838,000

180 days from funding

2 years from funding

$

331,000

180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding

2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

$

275,000

$

150,000

$

221,500

$

820,000

$

338,364

$

276,350

$

175,000

$

3,000,000

$

1,265,500

1077 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

DNR

Trout Lake SFCG

State Forest Campgrounds

Pathway Redevelopment

DNR

Houghton Lake SFCG

State Forest Campgrounds

Seawall Upgrades

DNR

St. Helen

Trails

Construct rock crawl as St. Helen Motorsport Park

DNR

Mt. Morris

Trails

Construct Phase II and III rock crawl at Genesee County Mounds Motorsport Park

DNR

Drummond Island

Trails

Drummond Island ORV route / road development

DNR

Gene's Pond SFCG

Trails

Pathway Redevelopment

DNR

Harlow Lake

Trails

Harlow Lake Pathway

DNR

Ocqueoc Falls

Trails

Trailhead / Pathway Redevelopment

DNR

Lake Ann SFCG

Trails

Pathway Redevelopment

DNR

Sec. 27 T27N R13 W

Trails

Construct connector trail for two existing pathway

DNR

T 28N R5W

Trails

New ORV trailhead design / build

DNR

Calumet

Trails

New ORV trailhead design / build

DNR

Houghton

Trails

New ORV trailhead design / build

DNR

Sidnaw

Trails

New ORV trailhead design / build

DNR

Felch

Trails

New ORV trailhead design / build

DNR

Escanaba

Trails

New ORV trailhead design / build

DNR

Trails

DNR

T49 &50N R 8 to 12W Roscommon Sec. 16 T24N R2W

DNR

Clearwater Township

Building Removals

DNR

Bear Lake Township

Building Removals

DNR

PRC

DNR

T37N/R19W/10/NENE

Building Removals

Pt. Detour Cabin and outbuilding

DNR

5666 S M-123, Newberry Building Removals

Demolish Newberry Office/Shop

DNR

5666 S M-123, Newberry Building Removals

Demolish Newberry Cold storage Block Bldg

DNR

Junction CR 407 & 410

Building Removals

Demolish Old Headquarters Bldgs

DNR

Dickinson county

Building Removals

Carollo cabin

DNR

Iron county

Building Removals

Mingella cabin

02262009

A T

O N

R d

ORV Restoration - Lake Superior Shoreline Protection

Office Facilities

e t t

it

m b u

Building Removals

S

st

e u

eq

s

Start Date 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding 180 days from funding

Repave existing runway, replace old runway lighting, hangar repairs

Livingston Property Skegomog site Pigeon River State Forest

Submitted Requests - Not Approved

Expected Completion Date 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

PP

O R

Funding Request $

150,000

$

750,000

$

200,000

$

300,000

$

250,000

$

243,650

$

151,500

$

710,000

$

354,342

$

15,000

$

130,000

$

130,000

$

130,000

$

130,000

$

130,000

$

130,000

$

50,000

$

398,000

$

50,000

$

30,000

$

50,000

$

50,000

$

30,000

$

20,000

$

20,000

$

50,000

$

50,000

D VE

Route (Infrastructure Only)

1078 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency DNR

Dickinson county

Building Removals

Rosely cabin

DNR

Clare county

Building Removals

remove 2 buildings

DNR

Grand Rapids

Grand Rapids fish ladder building

Construct - fish ladder counting/viewing/education room on the Grand River

DNR

Newberry

McAlpine Dam

Construction contract - McAlpine Dam Removal

Start Date 180 days from funding 180 days from funding 180 days from funding 180 days from funding

DNR

Julard Twp - Platte River State Fish Hatchery

Platte River State Fish Hatchery - effluent ponds

Construction Contract - Dredge effluent management ponds

180 days from funding

DNR

Julard Twp - Platte River State Fish Hatchery

DNR

Lapeer

DNR

Washtenaw

DNR

Muskegon

Platte River State Fish Hatchery - lower weir Ortonville Shooting Range / 7 & 200 Yard Range Construction Waterloo RA-Discovery Center, make highspeed internet capable Hoffmaster SP-Visitor Center, make highspeed internet capable

DNR

Ferry Township

Ferry Township Grant

DNR

Village of Lyons

Village of Lyons Grant

180 days from funding 180 days from Construct new seven yard and 200 yard shooting range funding 180 days from Technology Infrastructure funding 180 days from Technology Infrastructure funding Grant to Oceana Co. Road Commission to replace one bridge and seven culverts on 180 days from tributaries to the White River. receipt 180 days from Grant to local to remove dam and fish ladder receipt

DNR

Village of Chesaning

Village of Chesaning Grant

Grant to local for construction of rock ramp for fish passage on Shiawassee River. Seventy percent of funding secured, $500K to complete.

DNR

Van Etten Lake, Oscoda

Van Etten Lake Grant

Install multispecies fish passage structure at Van Etten Dam.

DNR

Manton Dam

Manton Dam Grant

DNR

City of Charlotte Grant Wheeler Creek Dam Grant

DNR

City of Charlotte Wheeler Creek Dam Manistee R. Thornapple and Battle Creek River

DNR

Bellevue

Bellevue Grant

DNR

Village of Nashville Cobmoosa Creek Buchanan Road

Village of Nashville Grant Cobmoosa Creek Grant

Grant to local for culvert replacement for aquatic organism passage - Oceana Co

City of Bangor Ray Township, N. Br. Clinton R.

City of Bangor Grant

Grant to local for dam modification and rock ramp

Ray Township Grant

Grant to local for removal of Cascade and Wolcott Rd. dams

City of Watervliet Grant

Grant to local for dam removal

DNR

City of Watervliet Kalkaska Co N Br Manistee R

Mecum Road

DNR

Harrison Twp - Lake St. Clair Research Station

Lake St. Clair Research Station

DNR

DNR DNR DNR DNR

Project Name

02262009

A T

s

st

d e t

O R

PP

O N

2 years from funding

2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

Mecum Road Stream Crossing replacement

2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

Construction of pole barn/ storage facility and heating/cooling system for energy efficiency (Engineering complete)

90 days from funding

2 years from funding

e u

q e R

Grant to local to remove dam

Grant to local for replacement of 6 culverts for aquatic organism passage

Grant to local for construction of fishway over historical dam Grant to local to remove dam

Submitted Requests - Not Approved

Funding Request $

75,000

$

60,000

$

1,000,000

$

50,000

$

500,000

$

150,000

$

800,000

$

40,000

$

20,000

$

1,000,000

$

1,300,000

$

500,000

$

463,000

$

450,000

$

350,000

$

300,000

$

215,000

$

250,000

$

175,000

$

111,000

$

110,000

$

110,000

$

100,000

$

300,000

$

235,000

D VE

180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt 180 days from receipt

Grant to local for wetland construction and sediment removal

ub

S

Construction contract- Anesthetic tank (Lower weir)

Grant to local to remove dam

Thornapple and Battle Creek River Grant

tt i m

Project Description

Expected Completion Date 2 years from funding 2 years from funding 2 years from funding 2 years from funding

Route (Infrastructure Only)

1079 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DNR

Charlevoix - Charlevoix Fisheries Research Station

Project Name

Project Description

Expected Completion Date

Start Date

Charlevoix Fisheries Research Station - boat Construction - Remodel boat storage facility, convert storage to office space, flooring 90 days from storage repair, and install fume and air system. funding Construction contract - Facility improvements: re-side and insulate Alpena Great Lakes Station building; demolish old building on property and water front improvements (dredging)

DNR

Construction Contract - New roof on pole barn

DNR

Gwinn Unit

Road improvement

Gravel 80 miles of state forest roads, Marquette County wide

DNR

Cadillac Pathway

Trails

Trailhead Parking

DNR

Gwinn Unit

Trails

Trail/Fence upgrades at LPI

DNR

Grand Rapids fish ladder gate

DNR

Portland Saline, Fisheries Research Station

Construction contract for electric gate for Fish ladder on the Grand River Construction Contract - Security fence (7' chain link for front, 5' welded wire for the rest)

DNR

Chocolay Twp - Marquette State Fish Hatchery Marquette State Fish Hatchery - raceways

Construction Contract for erosion control at bridge over Cherry Creek

DNR

Statewide Allegan County - Valley Township Oakland County - Holly Township Jackson County Grasslake Township Clinton County - Bath Township Ionia County - Otisco Township Roscommon County Gerrish Township Tuscola County - Elkland Township Baraga County - Baraga Township Saginaw County - St. Charles Township

Construction contract for facility reliability and public safety. This includes parking and driveway improvements; bridge replacement; pond improvements; upgrade gates and fencing; repair concrete pillars; renovate and repair buildings and structures; and othe 90 days from improvements. funding 180 days after Repair and renovate access site funds received 90 days after Large Storage Barn 50'X100' funds received 90 days after Large Storage Barn 50'X100' funds received 90 days after Large Storage Barn 50'X100' funds received 90 days after Large Storage Barn 50'X100' funds received 90 days after Large Storage Barn 40'X100' funds received 90 days after Large Storage Barn 40'X40' funds received 90 days after Large Storage Barn repair funds received 90 days after Field Office energy efficient repairs funds received

2 years from funding 365 days after funds received 365 days after funds received 365 days after funds received 365 days after funds received 365 days after funds received 365 days after funds received 365 days after funds received 365 days after funds received 365 days after funds received

DNR

Barry County Thornapple, Irving, Yankee Springs, and Rutland Townships

ADA Public Access

DNR

Baraga, MI

Baraga OSC-1

DNR

Gaylord, MI

Gaylord OSC-1

DNR

Grayling, MI

Grayling Field Office-1

DNR

Plainwell, MI

Plainwell OSC-1

90 days after Build permanent ADA accessible blinds, and improve trail and road system funds received Convert existing facilities to energy efficient LEEDS certified and ADA compliant office 120 days after building funds received 180 days after LEEDS certified administration office, energy efficient exterior lighting, and parking lot funds received 90 days after Energy efficient roof replacement funds received LEEDS certified Storage building with laboratory, energy efficient exterior lighting, and 90 days after parking lot repaving with retention tanks for grounds upkeep funds received

365 days after funds received 365 days from funding 365 days from funding 365 days from funding 365 days from funding

DNR DNR DNR DNR DNR DNR DNR DNR DNR

02262009

Saline fence

Hatchery Infrastructure Boating Access Site

e u

Building Building Building Building Building

tt i m

Building Building

b u S

Building

st

d e t

q e R

s

A T

O N

Submitted Requests - Not Approved

2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding 2 years from funding

O R

PP

90 days from funding

$

125,000

D VE

Alpena - Alpena Fisheries Research Station Alpena Fisheries Research Station Waterford, MDNR Fish Shop Waterford, MDNR Fish Shop

DNR

90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding 90 days from funding

2 years from funding

Funding Request

Route (Infrastructure Only)

$

110,000

$

10,000

$

2,300,000

$

60,000

$

95,000

$

50,000

$

45,000

$

50,000

$

710,500

$

75,000

$

110,000

$

110,000

$

110,000

$

110,000

$

100,000

$

80,000

$

50,000

$

152,000

$

400,000

$

700,000

$

600,000

$

104,000

$

1,300,000

1080 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency DNR

Project Name

DNR

Lake Co., Webber Twp. Gladwin County - North Grimm Township Midland County - Mills Township Saginaw County Zilwaukee Township Monroe County - Berlin Township Allegan County - Clyde Township Saginaw County Zilwaukee Township Kent County - Tyrone Township Saginaw County - St. Charles Township Menominee County Gourley Township Gratiot County - Hamilton Township

DNR

Gaylord, MI

Gaylord OSC

DNR

Bay City, MI

Bay City OSC-2

DNR

Gladwin, MI

Gladwin Field Office-1

DNR

Traverse City, MI

Traverse City OSC-1

DNR

Newberry, MI

Newberry OSC-1

DNR

Marquette, MI

Marquette OSC-1

DNR

Cadillac, MI

Cadillac OSC-1

DNR

Roscommon, MI

Roscommon OSC-1

DNR

Bay City, MI

Bay City OSC-1

DNR

Holly

DNR

Bay City

DNR

Pinckney

DNR

DNR

DNR DNR DNR DNR DNR DNR DNR DNR DNR

Project Description

Start Date 120 days from receipt 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received 180 days after funds received

Baldwin Field Office-1

Repair ADA Ramp and Landing

Dam

Dam repair

Dam

Dam repair

Dike

Repair area dike system

Dike

Repair area dike system

Dike

Repair area dike system

Public Access

Public Access Road Repair

Public Access

Public Access Road Repair

Water Control Structure

Erosion Control

Water Control Structure

Repair existing water control structure

Water Control Structure

Water impoundments repair

Lean-to for vehicle storage 120 days after LEEDS certified administration office, Storage building, energy efficient exterior 120 days after lighting, and parking lot funds received Convert existing facilities to energy efficient LEEDS certified and ADA compliant office 180 days after building funds received LEEDS certified administration office, Storage building, energy efficient exterior 180 days after lighting, and parking lot funds received LEEDS certified administration office, Storage building, energy efficient exterior 180 days after lighting, and parking lot funds received 180 days after LEEDS certified Storage building, energy efficient exterior lighting, and parking lot funds received 180 days after LEEDS certified Storage building, energy efficient exterior lighting, and parking lot funds received 180 days after LEEDS certified Storage building, energy efficient exterior lighting, and parking lot funds received LEEDS certified Storage building with laboratory, energy efficient exterior lighting, and 90 days after parking lot funds received

bm

A T

st

s

O N

PP

R d

e t t

it

O R

e u

eq

Expected Completion Date 6 months after funding 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days after fund received 730 days from funding 730 days from funding 730 days from funding 730 days from funding 730 days from funding 730 days from funding 730 days from funding 730 days from funding 730 days from funding

Funding Request $

25,000

$

54,250

$

115,000

$

50,000

$

200,000

$

200,000

$

34,000

$

50,000

$

250,000

$

100,000

$

10,000

$

46,000

$

1,500,000

$

300,000

$

2,900,000

$

1,800,000

$

600,000

$

600,000

$

600,000

$

1,300,000

D VE

Holly Recreation Area - Renovations

Rolston Cabin restoration of the foundation, floor and site repair

30 days after funding received

150 days after funding received

$

28,750

Bay City Recreation Area - Visitor Center Renovations

Floor Repair at the Visitor Center

90 days after funding received

150 days after funding received

$

13,800

Pinckney Recreation Area - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

Augusta

Fort Custer Recreation Area - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

218,500

Waterloo

Waterloo State Park - Demolition

Camp Waterloo demolition: asbestos abatement, demolition and disposal

90 days after funding received

180 days after funding received

$

287,500

02262009

u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

1081 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Route (Infrastructure Only)

90 days after funding received

180 days after funding received

Warren Dunes State Park - Activities Pavilion Education activities / program pavilion

90 days after funding received

180 days after funding received

$

34,500

Interlochen

Cold storage building to provide an adequate facility for housing of operational and Interlochen State Park - Cold Storage Building maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

Bay City

Bay City Recreation Area - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

Brighton

Island Lake Recreation Area - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

Harrisville

Cold storage building to provide an adequate facility for housing of operational and Harrisville State Park - Cold Storage Building maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

Grand Haven

Grand Haven State Park - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

287,500

DNR

Grayling

Grayling Field Office - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

143,750

DNR

Lupton

Rifle River Recreation Area - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

South Haven

Cold storage building to provide an adequate facility for housing of operational and Van Buren State Park - Cold Storage Building maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

Middleville

Yankee State Parking Recreation Area - Shop / Garage Building Replacement of the shop/garage structure that was destroyed in a 2005 fire.

90 days after funding received

180 days after funding received

$

442,750

DNR

Waterloo

Waterloo State Park - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

86,250

DNR

Ontonagon

Porcupine Mts Wilderness State Park - Cold Storage Building

Cold storage building to provide an adequate facility for housing of operational and maintenance equipment.

90 days after funding received

180 days after funding received

$

218,500

DNR

Pinckney

Lakelands Linear Trail State Park - Bridge Replacements

Install 3 pedestrian bridge structures on the Lakelands Trail State Park in Lyon Township. 1. Pontiac Trail 2. Grand River Ave. 3. Milford Road,

90 days after funding received

180 days after funding received

$

3,450,000 TE

DNR

Harbor Township

Lac Labelle Harbor Renovations

Lac Labelle - replacement of t-dock and infrastructure with site work

90 days after funding received

180 days after funding received

$

1,400,000

DNR

Augusta

Fort Custer Recreation Area - Playground

Universally accessible playground replacement located in the campground.

90 days after funding received

180 days after funding received

$

276,000

DNR

South Haven

Van Buren State Park - Playground

Universally accessible playground replacement located in the campground.

90 days after funding received

180 days after funding received

$

322,000

DNR

Copper Harbor

Fort Wilkins State Park - Bridge Replacement Ft. Wilkins SP - Replace Kamikazee Trail bridge

90 days after funding received

180 days after funding received

$

149,500

DNR

Bay City

Bay City Recreation Area - Demolition

DNR

Sawyer

DNR

02262009

Pumphouse and spillway demolition on Fournier Property

A T

t i m

O N

R d

ub

S

s

st

e u

eq

e t t

O R

Submitted Requests - Not Approved

PP

$

57,500

D VE

1082 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Ionia

Ionia Recreation Area - Fishing Pier

Fishing pier replacement with accessible route on Sessions Lake

90 days after funding received

180 days after funding received

DNR

Pinckney

Pinckney Recreation Area - Fishing Pier

An accessible route and fishing pier at Crooked Lake & Silver Lake.

90 days after funding received

180 days after funding received

$

248,400

DNR

Ortonville

Ortonville Recreation Area - Fishing Pier

New access route and accessible fishing pier.

90 days after funding received

180 days after funding received

$

94,875

DNR

Holland

Holland State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Rogers City

Hoeft State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

207,000

DNR

Holly

Holly Recreation Area - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Roscommon

South Higgins Lake State Park - Trail Improvements

Accessible surfacing improvements to an existing user-created foot path connecting the campground, boat launch and day use facilities.

90 days after funding received

180 days after funding received

$

86,250

DNR

Waterloo

Waterloo State Park - Trail Improvements

Trailhead signage and surfacing improvements

90 days after funding received

180 days after funding received

$

115,000

DNR

Champion

Craig Lake State Park - Road Improvements

90 days after Various surfacing, trailhead and signage improvements along the remote trail network.funding received

180 days after funding received

$

161,000

DNR

Harrisville

Harrisville State Park - Fishing Pier

Fishing pier replacement with accessible route

90 days after funding received

180 days after funding received

$

103,500

DNR

Holly

Seven Lakes State Park - Fishing Pier

Fishing pier replacement with accessible route on Big Seven Lake

90 days after funding received

180 days after funding received

$

103,500

DNR

Lake Orion

Bald Mt. Recreation Area - Fishing Pier

Fishing pier replacement with accessible route

90 days after funding received

180 days after funding received

$

103,500

DNR

Lupton

Rifle River Recreation Area - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Metamora

Metamora Hadley Recreation Area - Bridge Replacement

Safety replacement of a foot bridge on the hiking trail system.

90 days after funding received

180 days after funding received

$

86,250

DNR

Commerce Twp.

Proud Lake Recreation Area - Bridge Replacement

Floating boardwalk and bridge connection for equestrian trails and the canoe launch to90 days after the Powers Unit. funding received

180 days after funding received

$

172,500

DNR

Sawyer

Warren Dunes State Park - Bridge Replacement

Warren Dunes SP - Bridge / culvert replacement on primary road leading to swimming 90 days after / beach area funding received

180 days after funding received

$

920,000

DNR

Grand Haven

Grand Haven State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Waterloo

Waterloo State Park - Fishing Pier

Fishing pier replacement with accessible route on Crooked Lake

90 days after funding received

180 days after funding received

$

103,500

02262009

ub

S

A T

O N

R d

e t t

t i m

st

e u

eq

s

O R

Submitted Requests - Not Approved

PP

$

D VE

Route (Infrastructure Only)

103,500

1083 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Waterloo

Waterloo State Park - Fishing Pier

Fishing pier replacement with accessible route adjacent to Discovery Center

90 days after funding received

180 days after funding received

DNR

Harrisville

Harrisville State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Howell

Brighton Recreation Area - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Middleville

Yankee Springs Recreation Area - Fishing Pier

Fishing pier replacement and accessible route

90 days after funding received

180 days after funding received

$

103,500

DNR

Cheboygan

Aloha State Park - Playground

Universally accessible replacement playground situated so it can be utilized by both the camping and day use visitors.

90 days after funding received

180 days after funding received

$

276,000

DNR

Cadillac

Mitchell State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Brighton

Island Lake Recreation Area - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Onsted

Hayes State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Waterford

Dodge #4 State Park - Seawall Repairs

Sectional replacement of Cass Lake seawall at the day use beach area.

90 days after funding received

180 days after funding received

$

287,500

DNR

Champion

Craig Lake State Park - Bridge Replacement

Replacement of the Peshekee Bridge, which is part of the North County Trail, and provides access to hike in camping and two cabins.

90 days after funding received

180 days after funding received

$

189,750

DNR

Grayling

Hartwick Pines - Bridge Replacement

Bridge replacement within trail system

90 days after funding received

180 days after funding received

$

86,250

DNR

Muskegon

Hoffmaster State Park - Bridge Replacement Replacement of the pedestrian bridge connecting to the Visitor Center's entrance.

90 days after funding received

180 days after funding received

$

143,750

DNR

Monroe

Sterling State Park - Trail Paving

Surface improvements to connect internal trail system to City of Monroe's trail system 90 days after at Elm Street funding received

180 days after funding received

$

258,750

DNR

Roscommon

North Higgins Lake State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Newberry

Muskallonge State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Petoskey

Petoskey State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Ortonville

Ortonville Recreation Area - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Waterford

Pontiac Lake Recreation Area - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

02262009

ub

S

A T

O N

R d

e t t

t i m

st

e u

eq

s

O R

Submitted Requests - Not Approved

PP

$

D VE

Route (Infrastructure Only)

103,500

1084 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

90 days after funding received

180 days after funding received

South Higgins Lake State Park - Playground Universally accessible playground replacement located in the day use area.

90 days after funding received

180 days after funding received

$

276,000

Caseville

Sleeper State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Ontonagon

Porcupine Mts Wilderness State Park - Trail Improvements

Various surfacing, trailhead and signage improvements along the wilderness trail network.

90 days after funding received

180 days after funding received

$

161,000

DNR

Harrisville

Harrisville State Park - Trail Improvements

Internal US 23 Heritage Route & park connector

90 days after funding received

180 days after funding received

$

88,550

DNR

Holly

Seven Lakes State Park - Trail Improvements Accessible trail connections to Dickinson Lake fishing pier.

90 days after funding received

180 days after funding received

$

63,250

DNR

Cadillac

Mitchell State Park - Trail Improvements

Various surfacing, trailhead and signage improvements through the campground, day 90 days after use and Carl T. Johnson trail systems. funding received

180 days after funding received

$

230,000

DNR

Grayling

Hartwick Pines - Fishing Pier

Fishing pier replacement with accessible route

90 days after funding received

180 days after funding received

$

103,500

DNR

Ionia

Ionia Recreation Area - Playground

Replacement of two (2) accessible playground structures (at day use and at campground) as well as an accessible picnic structure at the beach area.

90 days after funding received

180 days after funding received

$

718,750

DNR

Ubly

Sanilac Petroglyphs - Bridge Replacement

Bridge replacement and trail system improvements

90 days after funding received

180 days after funding received

$

345,000

DNR

Ontonagon

Porcupine Mts. State Park - Bridge Replacement

Porcupine Mts. SP - Replace Presque Isle suspension bridge

90 days after funding received

180 days after funding received

$

35,000

DNR

Metamora

Metamora Hadley Recreation Area Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

253,000

DNR

Copper Harbor

Fort Wilkins Historic State Park - Bridge Replacement

Replace Lake Fanny Hooe bridge

90 days after funding received

180 days after funding received

$

138,000

DNR

Rogers City

Hoeft State Park - Interpretive Kiosk

Educational / interpretive kiosk for Thunder Bay National Marine Sanctuary

90 days after funding received

180 days after funding received

$

57,500

DNR

Crystal Falls

Bewabic State Park - Campground Electric

Bewabic SP - Finish campground electric upgrade in A loop. B and C loop were upgraded in 2005/06

90 days after funding received

180 days after funding received

$

347,875

DNR

Paradise

Tahquamenon Falls State Park - Trail Improvements

Snowmobile trail repairs and renovations

90 days after funding received

180 days after funding received

$

92,000

DNR

Pinckney

Pinckney Recreation Area - Trail Improvements

Trailhead signage and surfacing improvements

90 days after funding received

180 days after funding received

$

115,000

DNR

Bay City

Bay City Recreation Area - Fishing Pier

Upgrade fishing pier at the Visitor Center lagoon

90 days after funding received

180 days after funding received

$

23,000

DNR

N. Muskegon

Muskegon State Park - Playground

DNR

Roscommon

DNR

02262009

ub

S

st

e u

eq

s

O R

A T

O N

R d

e t t

t i m

Universally accessible playground replacement

Submitted Requests - Not Approved

PP

$

D VE

Route (Infrastructure Only)

253,000

1085 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

Route (Infrastructure Only)

DNR

St. Ignace

Straits State Park - Playground

Playground replacement with a universally accessible structure

90 days after funding received

180 days after funding received

DNR

Paradise

Tahquamenon Falls State Park - Playground Playground replacement with a universally accessible structure

90 days after funding received

180 days after funding received

$

253,000

DNR

Traverse City

Traverse City State Park - Playground

Universally accessible playground replacement

90 days after funding received

180 days after funding received

$

402,500

DNR

Montague

Montague Berry Junction State Recreation Trail

Asphalt pave the entire 11 mile length of trail, staging area, signage, landscaping

90 days after funding received

210 days after funding received

$

2,300,000 TE

DNR

South Haven

Van Buren Linear Trail State Park - Surfacing 14.4 miles of new limestone surfacing with subbase, 2 staging areas signage and Improvements landscaping

90 days after funding received

210 days after funding received

$

1,610,000 TE

DNR

Kal-Haven Linear Trail State Park - Surfacing Kalamazoo, South Haven Improvements 34 miles of new limestone surfacing, 4 rustic staging areas, equestrian trail, signage

90 days after funding received

210 days after funding received

$

3,450,000 TE

DNR

Hart

Hart Montague Linear Trail State Park Surfacing Improvements

90 days after funding received

210 days after funding received

$

4,025,000 TE

DNR

Pinckney

Lakelands Linear Trail State Park - Surfacing 90 days after Improvements Nine miles of asphalt paving/aggregate equestrian trail project, and two staging areas. funding received

210 days after funding received

$

1,725,000 TE

DNR

Cadillac, Big Rapids, Belmont

Fred Meijer White Pine Linear Trail State Park Asphalt pave a portion of the remaining 58 miles of trail, 4 rustic staging areas, - Surfacing Improvements signage, landscaping

90 days after funding received

210 days after funding received

$

5,750,000 TE

DNR

Cadillac, Big Rapids, Belmont

Fred Meijer White Pine Linear Trail State Park Pave Russell Road and 12 mile Road Staging areas, vault toilet, signage and - Surfacing Improvements landscaping

90 days after funding received

210 days after funding received

$

201,250 TE

DNR

Hawes Township

South Hubbard Lake Boat Access Site Redevelopment

South Hubbard Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

200,000

DNR

Pentland Township

Kak's Lake Boat Access Site Paving

Kak's Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

125,000

DNR

Morton Township

Lake Mecosta Boat Access Site Paving

Lake Mecosta Boat Access Site - paving

90 days after funding received

210 days after funding received

$

250,000

DNR

Newton Township

Lee Lake Boat Access Site Paving

Lee Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Statewide

90 days after funding received

210 days after funding received

$

5,000,000

DNR

Mackinaw City

90 days after funding received

210 days after funding received

$

3,500,000

DNR

Grattan Township

Big Pine Island Lake Boat Access Site Paving Big Pine Island Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Marcellus Township

Fish Lake Boat Access Site Paving

90 days after funding received

210 days after funding received

$

150,000

ub

O N

22 miles of asphalt trail restoration, restore 3 staging areas, bridges, signage and landscaping

st

e u

eq

s

Various Harbor/BAS - dredging of state harbors and boat access sites for safe Various Harbors / Boat Access Sites Dredging passage and launching / retrieval

S

02262009

t i m

A T

R d

e t t

Mackinac City Harbor New Construction

O R

Mackinac City - Floating piers, fuel system, utilities, ice suppression, sanitary pumpout.

Fish Lake Boat Access Site - paving

Submitted Requests - Not Approved

PP

$

253,000

D VE

1086 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Schoolcraft Township

Barton Lake Boat Access Site Paving

Barton Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

DNR

Chippewa Township

Chippewa Lake Boat Access Site Paving

Chippewa Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

200,000

DNR

Algoma Township

Camp Lake Boat Access Site Paving

Camp Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

200,000

DNR

Hayes Township

Cranberry Lake Boat Access Site Paving

Cranberry Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

200,000

DNR

Hartford Township

Rush Lake Boat Access Site Paving

Rush Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

125,000

DNR

Mason Township

Juno Lake Boat Access Site Paving

Juno Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Leighton Township

Green Lake Boat Access Site Paving

Green Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Leoni Township

Gilletts Lake Boat Access Site Paving

Gilletts Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Lyon Township

Higgins Lake Boat Access Site Paving

Higgins Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

200,000

DNR

Spencer Township

Lincoln Lake Boat Access Site Paving

Lincoln Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

100,000

DNR

Presque Isle Township

Presque Isle Boat Access Site Paving

Presque Isle Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Mendon Township

Portage Lake Boat Access Site Paving

Portage Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Algansee Township

Middle Lake Boat Access Site Paving

Middle Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Gilmore Township

Littlefield Lake Boat Access Site Paving

Littlefield Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

West Branch Township

Peach Lake Boat Access Site Paving

Peach Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

100,000

DNR

Maple Valley Township

Muskellunge Lake Boat Access Site Paving

Muskellunge Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Cambria Township

Cub Lake Boat Access Site Paving

Cub Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

125,000

DNR

Oscoda Township

Foote Dam Boat Access Site Paving

Foote Dam Boat Access Site - paving

90 days after funding received

210 days after funding received

$

300,000

ub

S

02262009

s

O N

R d

e t t

t i m

eq

A T

st

e u

O R

Submitted Requests - Not Approved

PP

$

D VE

Route (Infrastructure Only)

150,000

1087 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Pentland Township

Twin Lake Boat Access Site Paving

Twin Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

DNR

East Tawas

Tawas Lake Boat Access Site Paving

Tawas Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

100,000

DNR

Lexington

Lexington Harbor Paving

Lexington - paving

90 days after funding received

210 days after funding received

$

250,000

DNR

Trowbridge Township

Base Line Lake Boat Access Site Paving

Boat Access Sitee Line Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Bay De Noc Township

Stonington-Farmer's Dock Boat Access Site Paving

Stonington-Farmer's Dock Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Alanson

Crooked River Lock Renovations

Crooked River Lock - renovations

90 days after funding received

210 days after funding received

$

250,000

DNR

Lyndon Township

Bruin Lake Boat Access Site Paving

Bruin Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Porter Township

Cedar Lake Boat Access Site Paving

Cedar Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Portage

Austin Lake Boat Access Site Paving

Austin Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Pinckney

Lakelands Linear Trail State Park - Surfacing Putnam Township 6 mile asphalt paving/aggregate equestrian trail project, trail head 90 days after Improvements parking funding received

210 days after funding received

$

1,750,000

DNR

Franklin Township

Sand Lake Boat Access Site Paving

Sand Lake Boat Access Site - paving

90 days after funding received

210 days after funding received

$

150,000

DNR

Crystal Falls

Bewabic State Park - Green Toilet / Shower Building

Replacement of (2) T/S buildings with one ADA, "green", LEED centrally located structure servicing three campground loops.

180 days after funding received

240 days after funding received

$

1,518,000

Removal and replacement of the existing toilet building with ADA, "green", LEED structure that provides amenity services to the State's largest and deepest fresh water 180 days after spring observation area. funding received

240 days after funding received

$

417,450

180 days after funding received

240 days after funding received

$

2,175,800

180 days after funding received

240 days after funding received

$

1,186,800

Burt Lake State Park - Green Toilet / Shower Removal and replacement of the East Campground toilet/shower building (1957) with 180 days after Building ADA, "green", LEED structure and associated below ground utilities. funding received

240 days after funding received

$

1,384,600

e u

st

eq

s

O R

A T

O N

R d

e t t

PP

$

125,000

D VE

DNR

Manistique

Palms Book State Park - Green Toilet / Shower Building

DNR

Holly

Holly Recreation Area - Green Toilet / Shower Removal and replacement of two toilet/shower buildings servicing the campground Building with ADA, "green", LEED structures.

DNR

Copper Harbor

DNR

Indian River

DNR

South Haven

Van Buren State Park - Green Toilet / Shower Removal and replacement of the (2) Campground toilet/shower buildings (1960) with 180 days after Building ADA, "green", LEED structures and associated below ground utilities. funding received

240 days after funding received

$

2,769,200

DNR

Toivola

Twin Lakes State Park - Green Toilet / Shower Building

240 days after funding received

$

1,186,800

ub

S

02262009

t i m

Fort Wilkins Historic State Park - Green Toilet Removal and replacement of the Campground toilet/shower building with ADA, / Shower Building "green", LEED structure and associated below ground utilities.

Removal and replacement of the Campground toilet/shower building with ADA, "green", LEED structure and associated below ground utilities.

Submitted Requests - Not Approved

180 days after funding received

Route (Infrastructure Only)

1088 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Sawyer

Warren Dunes State Park - Green Toilet / Shower Building

Removal of four (4) existing restroom buildings that and concessions and the construction of one ADA, "green", LEED structure at the day use beach at Lake Michigan.

DNR

Manistique

Indian Lake State Park - Green Toilet / Shower Building

Replacement of two (2) campground toilet/shower buildings with one (1) ADA, "green", LEED building servicing the associated campsites.

180 days after funding received

240 days after funding received

$

1,794,000

DNR

Rogers City

Hoeft State Park - Green Toilet / Shower Building

Removal and replacement of the Lower Campground toilet/shower building with ADA, 180 days after "green", LEED structure and associated below ground utilities. funding received

240 days after funding received

$

1,285,700

DNR

Baraga

Baraga State Park - Green Toilet / Shower Building

Removal and replacement of the Campground toilet/shower building (1941) with ADA, 180 days after "green", LEED structure and associated below ground utilities. funding received

240 days after funding received

$

1,384,600

DNR

Brimley

Brimley State Park - Green Toilet / Shower Building

Replacement of two (2) campground toilet/shower buildings with one (1) ADA, "green", LEED building servicing the associated campsites.

180 days after funding received

240 days after funding received

$

1,518,000

DNR

Port Austin

Port Crescent State Park - Green Toilet / Shower Building

Removal and replacement of the West Campground toilet/shower building with ADA, 180 days after "green", LEED structure and associated below ground utilities. funding received

240 days after funding received

$

1,285,700

DNR

Pinckney

Pinckney Recreation Area - Green Toilet / Shower Building

Replacement of the existing Bruin Lake campground T/S building (1960's) with an accessible, "green", LEED structure. Upgrade of the chlorination system servicing 180 days after this proposed structure in the existing well house building to address mineral deposits funding received

240 days after funding received

$

1,581,250

DNR

Holland

Holland State Park - Green Toilet / Shower Building

Removal and replacement of two toilet/shower buildings servicing the campground with ADA,"green", LEED structures.

180 days after funding received

240 days after funding received

$

2,175,800

DNR

Laingsburg

Sleepy Hollow State Park - Green Toilet / Shower Building

Replacement of (2) T/S buildings with ADA,"green", LEED structures.

180 days after funding received

240 days after funding received

$

2,175,800

DNR

Cheboygan

Aloha State Park - Green Toilet / Shower Building

Replacement of two (2) campground toilet/shower buildings with one (1) ADA, "green", LEED building servicing the associated campsites.

180 days after funding received

240 days after funding received

$

1,794,000

DNR

Ontonagon

Porcupine Mts Wilderness State Park - Green Replacement of the Union Bay campground toilet/shower building with ADA, "green", 180 days after Toilet / Shower Building LEED structure. funding received

240 days after funding received

$

1,186,800

DNR

Northport

Leelanau State Park - Green Toilet / Shower Building

180 days after funding received

240 days after funding received

$

1,285,700

DNR

Lakeport

Lakeport State Park - Green Toilet / Shower Building

Removal and replacement of the South Campground toilet/shower building with ADA, 180 days after "green", LEED structure and associated below ground utilities. funding received

240 days after funding received

$

1,087,900

DNR

St. Ignace

Replacement of (2) campground T/S buildings (1968 & 1969) with one centrally located ADA, "green", LEED, structure.

180 days after funding received

240 days after funding received

$

1,518,000

DNR

Carp Lake

Wilderness State Park - Green Toilet / Shower Removal and replacement of the (2) Campground toilet/shower buildings with ADA, Building "green", LEED structures and associated below ground utilities.

180 days after funding received

240 days after funding received

$

2,769,200

DNR

Harrison

Wilson State Park - Green Toilet / Shower Building

Replacement of two (2) campground toilet/shower buildings with one (1) ADA, "green", LEED building servicing both campground loops.

180 days after funding received

240 days after funding received

$

1,794,000

DNR

Bay City

Bay City Recreation Area - Trail Paving

Bay City RA - Repaving of the trail systems (accessible) within the Tobico Marsh

180 days after funding received

270 days after funding received

$

488,750

DNR

Ontonagon

Porcupine Mts Wilderness State Park - Bridge Renovations, replacements and upgrades to the various observation areas, bridge & Boardwalk Replacements and boardwalk system at the Presque Isle Unit

180 days after funding received

270 days after funding received

$

575,000

02262009

itt

d e t

bm

Straits State Park - Green Toilet / Shower Building

u S

180 days after funding received

240 days after funding received

O R

A T

e u

st

q e R

s

O N

A new Campground toilet/shower building that is ADA compliant, "green", LEED structure and associated below ground utilities.

Submitted Requests - Not Approved

PP

$

Route (Infrastructure Only)

1,035,000

D VE

1089 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

180 days after funding received

270 days after funding received

Bay City Recreation Area - Wildlife Observation Towers

Bay City RA - Replacement of two observation tower with accessible ramped version 180 days after along the Tobico Marsh. funding received

270 days after funding received

$

897,000

Holland

Holland State Park - ADA Beach Improvements

Accessibility improvements at the Lake Michigan beach area providing access into the180 days after water, picnic tables, benches and two (2) picnic shelters. funding received

270 days after funding received

$

345,000

DNR

Holly

Seven Lakes State Park - ADA Beach Improvements

New accessible sidewalk and water access at Big Seven Beach

180 days after funding received

270 days after funding received

$

82,225

DNR

Clayton

Lake Hudson RA - Structural repair of the Lake Hudson dam spillway barrier per DEQ 90 days after Lake Hudson Recreation Area - Dam Repairs requirements. funding received

270 days after funding received

$

345,000

DNR

Port Austin

Port Crescent State Park - Access to Recreation

Port Cresecent SP - Phase II, Access to Recreation - Provide accessibility to Great Lakes beach, play equipment, hunting & Pinnebog River fishing

90 days after funding received

270 days after funding received

$

805,000

270 days after funding received

$

1,150,000

270 days after funding received

$

805,000

270 days after funding received

$

805,000

DNR

Bay City

Bay City Recreation Area - Boardwalk Repairs Tobico Marsh boardwalk replacement

DNR

Bay City

DNR

O R

A T

PP

$

23,000

D VE

DNR

Waterford

Dodge #4 State Park - Access to Recreation

Dodge #4 SP - Phase II, Access to Recreation - Provide accessible interpretive trail & bridge modifications, picnic nodes, canal viewing deck, interpretive directory and 90 days after playground elements funding received

DNR

Howell

Brighton Recreation Area - Access to Recreation

Brighton RA - Phase II, Access to Recreation - Provide accessible Bishop Lake water 90 days after crossing and trail completion, and remote cabin funding received

DNR

Cedar River

Wells State Park - Access to Recreation

Wells SP - Phase II, Access to Recreation - Provide accessibility to outdoor learning 90 days after center & stream restoration, trail surfacing & observation deck. funding received

DNR

Lupton

Rifle River RA - Phases I & II, Access to Recreation - Provide accessibility to fishing pods, rustic & modern campsite improvements, canoe / kayak launch, rustic cabin Rifle River State Park - Access to Recreation upgrades, observation tower

90 days after funding received

270 days after funding received

$

1,150,000

DNR

Victor Township

Sleepy Hollow S.P. Boat Access Site

Sleepy Hollow S.P. Boat Access Site - redevelopment and paving

90 days after funding received

270 days after funding received

$

750,000

DNR

Holly

Seven Lakes State Park - Dam Repairs

Seven Lakes SP - Repair Big Seven Lake dam levy with siltation blanket

90 days after funding received

270 days after funding received

$

442,750

DNR

Port Austin

Port Austin Harbor Renovations

Port Austin - Reconfigure parking lot/entrance, site utilities, shoreline rip-rap, drainage 90 days after control. funding received

270 days after funding received

$

1,500,000

DNR

N. Muskegon

Muskegon SP - Phase II, Access to Recreation - Accessible renovations to Winter Sports Facility, modern campground site improvements, lodge area improvements, Muskegon State Park - Access to Recreation Lost Lake observation deck

90 days after funding received

270 days after funding received

$

977,500

DNR

Garfield Township

DNR

Gaylord

DNR

DNR

eq

R d

e t t

t i m

e u

st

s

O N

ub

Eight Point Lake Boat Access Site Paving

Eight Point Lake Boat Access Site - new development

90 days after funding received

270 days after funding received

$

500,000

Otsego Lake State Park - Access to Recreation

Ostego Lake SP - Phase I & II, Access to Recreation - Provide interpretive trails, beach / water access, playground elements

90 days after funding received

270 days after funding received

$

977,500

Rogers City

Hoeft State Park - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

356,500

Port Austin

Port Crescent State Park

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

356,500

02262009

S

Submitted Requests - Not Approved

Route (Infrastructure Only)

1090 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Commerce Twp.

Proud Lake Recreation Area - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

DNR

Onsted

Hayes State Park - Campground Registration Replacement of campground contact/registration building (accessible) and vehicular 180 days after Building circulation. funding received

300 days after funding received

$

356,500

DNR

Baraga

Baraga State Park - Campground Registration Replacement of campground contact/registration building (accessible) and vehicular 180 days after Building circulation. funding received

300 days after funding received

$

356,500

DNR

Marine City

Algonac State Park - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

356,500

DNR

Waterford

Pontiac Lake Recreation Area - Campground Replacement of campground contact/registration building (accessible) and vehicular 180 days after Registration Building circulation. funding received

300 days after funding received

$

356,500

DNR

Toivola

Twin Lakes State Park - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

356,500

DNR

Holland

Holland State Park - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

392,150

DNR

Grand Haven

Grand Haven State Park -Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

632,500

DNR

Marenisco

Lake Gogebic State Park - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

356,500

DNR

Manistique

Indian Lake State Park - Campground Registration Building

Indian Lake SP - Replace contact building (ADA) and associated vehicular circulation 180 days after at the modern campground funding received

300 days after funding received

$

546,250

DNR

Pinckney

Pinckney Recreation Area - Campground Registration Building

Replacement of campground contact/registration building (accessible) and vehicular 180 days after circulation. funding received

300 days after funding received

$

354,200

DNR

Roscommon

North Higgins Lake State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed at the CCC Museum 180 days after area funding received

300 days after funding received

$

402,500

DNR

Ortonville

Ortonville Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (4 lane miles)

180 days after funding received

300 days after funding received

$

193,200

DNR

Caseville

Sleeper State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (9 lane miles)

180 days after funding received

300 days after funding received

$

414,000

DNR

Waterford

Dodge 4 State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (6 lane miles)

180 days after funding received

300 days after funding received

$

287,500

DNR

Northport

Leelanau State Park - Road Improvements

180 days after Resurfacing, chip seal, reconstruction & new paving as needed within the campgroundfunding received

300 days after funding received

$

575,000

DNR

Metamora

Metamora Hadley Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (10 lane miles)

180 days after funding received

300 days after funding received

$

550,275

DNR

Pentwater

Mears State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (5 lane miles)

180 days after funding received

300 days after funding received

$

241,500

02262009

ub

S

A T

e u

st

eq

s

PP

O N

R d

e t t

t i m

O R

Submitted Requests - Not Approved

$

D VE

Route (Infrastructure Only)

356,500

1091 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

DNR

Holly

Seven Lakes State Park - Road Improvements

DNR

Mears

DNR

Project Description

Expected Completion Date

Start Date

Funding Request

180 days after funding received

300 days after funding received

Silver Lake State Park - Road Improvements Resurfacing, chip seal, reconstruction & new paving as needed (10 miles)

180 days after funding received

300 days after funding received

$

485,300

Port Austin

Port Crescent State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (10 lane miles)

180 days after funding received

300 days after funding received

$

485,300

DNR

Lake Orion

Bald Mt. Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (12 lane miles)

180 days after funding received

300 days after funding received

$

546,250

DNR

Marine City

Algonac State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (12 lane miles)

180 days after funding received

300 days after funding received

$

546,250

DNR

Bay City

Bay City Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed at the day use area

180 days after funding received

300 days after funding received

$

431,250

DNR

Baraga

Baraga State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (4 lane miles)

180 days after funding received

300 days after funding received

$

195,500

DNR

Brighton

Island Lake Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed at the shooting range 180 days after parking area funding received

300 days after funding received

$

86,250

DNR

Muskegon

Hoffmaster State Park - Road Improvements Resurfacing, chip seal, reconstruction & new paving as needed (17 lane miles)

180 days after funding received

300 days after funding received

$

776,250

DNR

Holly

Holly Recreation Area - Road Improvements Resurfacing, chip seal, reconstruction & new paving as needed (22 lane miles)

180 days after funding received

300 days after funding received

$

1,209,340

DNR

White Lake

Highland Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (14 lane miles)

180 days after funding received

300 days after funding received

$

655,500

DNR

Lakeport

Lakeport State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (16 lane miles)

180 days after funding received

300 days after funding received

$

773,950

DNR

Jackson

Jackson Field Office - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (3 lane miles)

180 days after funding received

300 days after funding received

$

138,000

DNR

Clayton

Lake Hudson Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (13 lane miles)

180 days after funding received

300 days after funding received

$

575,000

DNR

Northville

Maybury State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (5 lane miles)

180 days after funding received

300 days after funding received

$

241,500

DNR

Marquette

Laughing Whitefish Falls State Scenic Site Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed at entrance area

180 days after funding received

300 days after funding received

$

287,500

DNR

Manistique

Palms Book State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (1 lane mile)

180 days after funding received

300 days after funding received

$

46,000

DNR

Ontonagon

Porcupine Mts Wilderness State Park - Road Resurfacing, chip seal, reconstruction & new paving as needed at entrance, Improvements headquarters and parking area

180 days after funding received

300 days after funding received

$

287,500

02262009

Resurfacing, chip seal, reconstruction & new paving as needed (21 lane miles)

t i m

S

ub

A T

e u

st

eq

s

O N

R d

e t t

O R

Submitted Requests - Not Approved

PP

$

Route (Infrastructure Only)

1,017,750

D VE

1092 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Toivola

Twin Lakes State Park - Road Improvements Resurfacing, chip seal, reconstruction & new paving as needed (4 lane miles)

180 days after funding received

300 days after funding received

DNR

South Haven

Van Buren State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (7 lane miles)

180 days after funding received

300 days after funding received

$

316,250

DNR

Grand Haven

Grand Haven State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (7 lane miles)

180 days after funding received

300 days after funding received

$

316,250

DNR

Commerce Twp.

Proud Lake Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (11 lane miles)

180 days after funding received

300 days after funding received

$

517,500

DNR

Waterloo

Waterloo State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (20 lane miles)

180 days after funding received

300 days after funding received

$

937,250

DNR

Pinckney

Pinckney Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (16 lane miles)

180 days after funding received

300 days after funding received

$

747,500

DNR

Laingsburg

Sleepy Hollow State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (25 lane miles)

180 days after funding received

300 days after funding received

$

1,375,055

DNR

Carp Lake

Wilderness State Park - Road Improvements Resurfacing, chip seal, reconstruction & new paving as needed (11 lane miles)

180 days after funding received

300 days after funding received

$

506,000

DNR

Middleville

Yankee Springs Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (12 lane miles)

180 days after funding received

300 days after funding received

$

575,000

DNR

Boyne City

Young State Park - Road Improvements

180 days after Resurfacing, chip seal, reconstruction & new paving as needed within the campgroundfunding received

300 days after funding received

$

937,250

DNR

Waterford

Pontiac Lake Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (20 lane miles)

180 days after funding received

300 days after funding received

$

920,000

DNR

Roscommon

South Higgins Lake State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (20 lane miles)

180 days after funding received

300 days after funding received

$

968,300

DNR

Traverse City

Traverse City State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed within the campground180 days after and day use area funding received

300 days after funding received

$

1,150,000

DNR

East Tawas

Resurfacing, chip seal, reconstruction & new paving as needed within the campground180 days after Tawas Point State Park - Road Improvements and day use area funding received

300 days after funding received

$

1,150,000

DNR

Newberry

DNR

Howell

t i m

ub

S

A T

e u

st

eq

s

O N

R d

e t t

PP

193,200

D VE

Muskallonge State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (8 lane miles)

180 days after funding received

300 days after funding received

$

373,750

Brighton Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (14 lane miles)

180 days after funding received

300 days after funding received

$

632,500

180 days after funding received

300 days after funding received

$

862,500

180 days after funding received

300 days after funding received

$

333,500

DNR

Garden

Fayette Historic State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed at entrance, campground roads, interpretive areas and parking of 19th century historic iron mill townsite

DNR

Rogers City

Hoeft State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (7 lane miles)

02262009

O R

$

Submitted Requests - Not Approved

Route (Infrastructure Only)

1093 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Sawyer

Warren Dunes State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (6 lane miles)

180 days after funding received

300 days after funding received

DNR

Onsted

Hayes State Park - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (15 lane miles)

180 days after funding received

300 days after funding received

$

690,000

DNR

Augusta

Fort Custer Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (29 lane miles)

180 days after funding received

300 days after funding received

$

1,322,500

DNR

Lupton

Rifle River Recreation Area - Road Improvements

Resurfacing, chip seal, reconstruction & new paving as needed (7 lane miles)

180 days after funding received

300 days after funding received

$

333,500

DNR

Ionia

Ionia Recreation Area - Road Improvements Resurfacing, chip seal, reconstruction & new paving as needed (17 lane miles)

180 days after funding received

300 days after funding received

$

776,250

DNR

Ionia

Ionia Recreation Area - Drinking Water System Improvements

180 days after funding received

330 days after funding received

$

462,300

DNR

Northport

Leelanau State Park - Drinking Water System Improvements Water treatment system

180 days after funding received

330 days after funding received

$

189,750

DNR

Petoskey

Petoskey State Park - Drinking Water System Replacement of two (2) below ground water wells and tanks to above ground Improvements systems.

180 days after funding received

330 days after funding received

$

523,250

DNR

Carp Lake

Wilderness State Park - Drinking Water System Improvements

Replacement of water system throughout the modern campground (in conjunction with180 days after new T/S bldg) funding received

330 days after funding received

$

462,300

DNR

Indian River

Burt Lake State Park - Drinking Water System Upgrade campground wells and well house (DEQ requirement) to an above ground Improvements system.

180 days after funding received

330 days after funding received

$

261,625

DNR

Cheboygan

Aloha State Park - Drinking Water System Improvements

Upgrade two campground wells and well houses (DEQ requirement).

180 days after funding received

330 days after funding received

$

442,750

DNR

Onsted

Hayes State Park - Drinking Water System Improvements

Replacement of the campground water system.

180 days after funding received

330 days after funding received

$

419,750

DNR

Holly

Holly Recreation Area - Drinking Water System Improvements

Below ground water tank removals at Heron Beach, Wildwood Picnic area, Valley Boat Access Site and Oak Flats Shelter

180 days after funding received

330 days after funding received

$

51,750

DNR

Manistique

Indian Lake State Park - Drinking Water System Improvements

Upgrade campground wells and well house (DEQ requirement) to an above ground system.

180 days after funding received

330 days after funding received

$

287,500

DNR

Toivola

Twin Lakes State Park - Drinking Water System Improvements

Replacement of below ground water well and tanks to an above ground system (DEQ 180 days after requirement). Also the replacement of the sanitary lift station. funding received

330 days after funding received

$

442,750

DNR

Grayling

Hartwick Pines State Park- Drinking Water System Improvements

Upgrade campground wells and well house (DEQ requirement) to an above ground system.

180 days after funding received

330 days after funding received

$

287,500

DNR

Ludington

Ludington State Park - Drinking Water System 180 days after Improvements Water system renovation in all campgrounds, HQ and Lake Michigan Day Use areas funding received

330 days after funding received

$

936,100

DNR

Hancock

McLain State Park - Drinking Water System Improvements

330 days after funding received

$

287,500

02262009

ub

S

e u

st

eq

O N

R d

e t t

t i m

A T

Replacement of the campground water system.

s

O R

Upgrade campground wells and well house (DEQ requirement) to an above ground system.

Submitted Requests - Not Approved

PP

180 days after funding received

$

Route (Infrastructure Only)

413,655

D VE

1094 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Newberry

Muskallonge State Park - Drinking Water System Improvements

Upgrade campground wells and well house (DEQ requirement) to an above ground system.

180 days after funding received

330 days after funding received

DNR

Ontonagon

Porcupine Mts Wilderness State Park Drinking Water System Improvements

Union Bay Campground, replace water system (in conjunction with new T/S bldg)

180 days after funding received

330 days after funding received

$

462,300

DNR

Port Austin

Port Crescent State Park - Drinking Water System Improvements

Campground water lines and spigot replacements

180 days after funding received

330 days after funding received

$

402,500

DNR

Lupton

Rifle River Recreation Area - Drinking Water System Improvements

Well replacement at day use area

180 days after funding received

330 days after funding received

$

287,500

DNR

Ontonagon

Porcupine Mts Wilderness State Park Drinking Water System Improvements

Upgrade campground wells and well house (DEQ requirement) to an above ground system at the Presque Isle Unit.

180 days after funding received

330 days after funding received

$

287,500

DNR

Boyne City

Young State Park - Drinking Water System Improvements

Replacement of below ground water well and tanks to an above ground system (DEQ 180 days after requirement). funding received

330 days after funding received

$

425,500

DNR

Holly

Seven Lakes State Park - Drinking Water System Improvements

Water well and tank replacements at Big Seven Lake shelter and Big Seven beach

180 days after funding received

330 days after funding received

$

161,000

DNR

Atlanta

Clear Lake State Park - Drinking Water System Improvements

Upgrade campground wells and well house (DEQ requirement) to an above ground system.

180 days after funding received

330 days after funding received

$

261,625

DNR

Interlochen

Interlochen State Park - Drinking Water System Improvements

Water treatment system

180 days after funding received

330 days after funding received

$

189,750

DNR

Interlochen

Interlochen State Park - Drinking Water System Improvements

Water well replacement at Green Lake Camp

180 days after funding received

330 days after funding received

$

287,500

DNR

Metamora

Metamora Hadley Recreation Area - Drinking Water System Improvements Water system replacements in both the North & South campgrounds (1966)

180 days after funding received

330 days after funding received

$

419,750

DNR

Roscommon

North Higgins Lake State Park - Drinking Water System Improvements

Water well replacement at interpretive area

180 days after funding received

330 days after funding received

$

287,500

DNR

Pinckney

Pinckney Recreation Area - Drinking Water System Improvements

Water system replacement throughout the Bruin Lake campground.

180 days after funding received

330 days after funding received

$

417,450

DNR

Roscommon

South Higgins Lake State Park - Drinking Water System Improvements

Water treatment system

180 days after funding received

330 days after funding received

$

189,750

DNR

Interlochen

Interlochen State Park - Campground Electrical System

Campground and day use building electrical system replacement and pedestal upgrades.

180 days after funding received

360 days after funding received

$

1,897,500

DNR

Baraga

Baraga State Park - Sanitary System Improvements

Sanitation Station replacement

180 days after funding received

360 days after funding received

$

189,750

DNR

Howell

Brighton Recreation Area - Sanitary System Improvements

Replacement of septic tanks servicing the modern campground

180 days after funding received

360 days after funding received

$

57,500

DNR

Baraga

Baraga State Park - Sanitary System Improvements

Sewer line replacement

180 days after funding received

360 days after funding received

$

460,000

02262009

t i m

ub

S

A T

st

e u

eq

s

O N

R d

e t t

O R

Submitted Requests - Not Approved

PP

$

Route (Infrastructure Only)

287,500

D VE

1095 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Marine City

Algonac State Park - Shooting Range Improvements

Safety and security enhancements

180 days after funding received

360 days after funding received

DNR

Traverse City

Traverse City State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service and one 180 days after pedestal per campsite. funding received

360 days after funding received

$

1,752,600

DNR

Holly

Seven Lakes State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

414,000

DNR

Roscommon

South Higgins Lake State Park - Sanitary System Improvements

Park wide replacement of sanitary lines

180 days after funding received

360 days after funding received

$

404,800

DNR

Roscommon

South Higgins Lake State Park - Sanitary System Improvements

Sanitation station upgrade to four lanes

180 days after funding received

360 days after funding received

$

115,000

DNR

Lakeport

Lakeport State Park - Campground Electrical Replacement and pedestal improvements to the North and South campground's System electrical systems.

180 days after funding received

360 days after funding received

$

1,230,500

DNR

Interlochen

Interlochen State Park - Sanitary System Improvements

Sewer line replacement in the south campground

180 days after funding received

360 days after funding received

$

805,000

DNR

Muskegon

Hoffmaster State Park - Sanitary System Improvements

Sanitation Station replacement to meet current demand of 300 sites

180 days after funding received

360 days after funding received

$

189,750

DNR

Ludington

Ludington State Park - Sanitary System Improvements

Relocate sanitation station.

180 days after funding received

360 days after funding received

$

230,000

DNR

Lupton

Rifle River Recreation Area - Sanitary System Improvements Sanitation station & lift station replacements (2)

180 days after funding received

360 days after funding received

$

287,500

DNR

Caseville

Sleeper State Park - Sanitary System Improvements

Replacement of the East Campground sewage main for improved sanitary service.

180 days after funding received

360 days after funding received

$

101,200

DNR

Augusta

Fort Custer Recreation Area - Sanitary System Improvements

Replacement of campground sanitation station.

180 days after funding received

360 days after funding received

$

287,500

DNR

Muskegon

Hoffmaster State Park - Sanitary System Improvements

Replacement of sanitary pump/lift station servicing campground.

180 days after funding received

360 days after funding received

$

494,500

DNR

Ionia

Ionia Recreation Area - Sanitary System Improvements

Septic tank replacement and pump system within the modern campground

180 days after funding received

360 days after funding received

$

86,250

DNR

Waterford

Pontiac Lake Recreation Area - Campground Electrical System Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

977,500

DNR

Laingsburg

Sleepy Hollow State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

727,375

DNR

Newberry

Muskallonge State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

1,009,125

DNR

Holly

Holly Recreation Area - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

805,000

02262009

ub

S

A T

O N

R d

e t t

t i m

st

e u

eq

s

O R

Submitted Requests - Not Approved

PP

$

Route (Infrastructure Only)

345,000

D VE

1096 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Cheboygan

Cheboygan State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

DNR

Atlanta

Clear Lake State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

747,500

DNR

Marenisco

Lake Gogebic State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

629,625

DNR

Howell

Brighton Recreation Area - Campground Electrical System

Upgrade campground electrical service to 50 amp

180 days after funding received

360 days after funding received

$

460,000

DNR

Baraga

Baraga State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

632,500

DNR

Carp Lake

Wilderness State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service and one 180 days after pedestal per campsite. funding received

360 days after funding received

$

1,752,600

DNR

Waterloo

Waterloo State Park - Campground Electrical System Electrical service panel replacement at Portage Lake Oak Building

180 days after funding received

360 days after funding received

$

57,500

DNR

Middleville

Yankee Springs Recreation Area Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

1,181,625

DNR

Harrison

Wilson State Park - Sanitary System Improvements

Wilson SP - Replacement of sanitary pump/lift station servicing campground.

180 days after funding received

360 days after funding received

$

448,500

DNR

Traverse City

Traverse City State Park - Sanitary System Improvements

Sanitation station upgrade to four lanes

180 days after funding received

360 days after funding received

$

115,000

DNR

Holland

Holland State Park - Sanitary System Improvements

Replacement of campground sanitation station.

180 days after funding received

360 days after funding received

$

189,750

DNR

Lupton

Rifle River Recreation Area - Campground Electrical System

Upgrade / replacement of the campground electrical service to 30/50 amp

180 days after funding received

360 days after funding received

$

1,380,000

DNR

Rogers City

Hoeft State Park - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

845,250

DNR

Augusta

Fort Custer Recreation Area - Campground Electrical System

Campground electrical system replacement to provide 20/30/50 amp service.

180 days after funding received

360 days after funding received

$

1,098,250

DNR

DeTour

DeTour Harbor Renovations

DeTour - marina rehabilitation, new piers, wind energy augmented ice suppression system, energy efficient utilities, restroom

90 days after funding received

360 days after funding received

$

5,000,000

DNR

Commerce Twp.

Proud Lake Recreation Area - Green Toilet / Shower Buildings

Proud Lake RA - Replacement of (2) T/S buildings (1964 & 1968) with one centrally located ADA, "green", LEED structure.

180 days after funding received

420 days after funding received

$

1,518,000

S. Higgins Lake SP - Removal and replacement of the South Campground toilet/shower building with ADA, "green", LEED structure and associated below ground180 days after utilities. funding received

420 days after funding received

$

1,285,700

420 days after funding received

$

2,175,800

ub

S

A T

O N

R d

e t t

t i m

st

e u

eq

s

O R

PP

DNR

Roscommon

S. Higgins Lake State Park - Green Toilet / Shower Buildings

DNR

Harrisville

Harrisville State Park - Green Toilet / Shower Harrisville SP - Removal and replacement of two toilet/shower buildings servicing the 180 days after Buildings campground with (2) ADA, "green", LEED structures. funding received

02262009

Submitted Requests - Not Approved

$

Route (Infrastructure Only)

465,750

D VE

1097 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Funding Request

DNR

Interlochen

Interlochen State Park - Green Toilet / Shower Interlochen SP - Removal and replacement of the South Campground toilet/shower Buildings building with ADA, "green", LEED structures and associated below ground utilities.

180 days after funding received

420 days after funding received

DNR

Traverse City

Traverse City State Park - Green Toilet / Shower Buildings

Traverse City SP - Replacement of two (2) campground toilet/shower buildings with one (1) ADA, "green", LEED building servicing the associated campsites.

180 days after funding received

420 days after funding received

$

1,794,000

420 days after funding received

$

1,518,000

$

1,285,700

D VE

DNR

Roscommon

N. Higgins Lake State Park - Green Toilet / Shower Buildings

N. Higgins Lake SP - Removal and replacement of the East Campground toilet/shower building with ADA, "green", LEED structure and associated below ground180 days after utilities. funding received

DNR

Waterloo

Waterloo State Park - Mill Lake Outdoor Center Renovations

Mill Lake Historic Outdoor Center facility renovation including associated utility upgrades

180 days after funding received

450 days after funding received

$

4,025,000

DNR

Statewide

Statewide Archery Ranges

10 station archery shooting ranges (5)

180 days after funding received

450 days after funding received

$

115,000

DNR

Lake Orion

Bald Mt. Recreation Area - Shooting Range Improvements

Shooting range redevelopment including road and parking areas

180 days after funding received

450 days after funding received

$

862,500

DNR

Detroit

Tri-Centennial State Park & Harbor - Multi-use Trail Phase III, development of the mulit-use trail corridor

180 days after funding received

450 days after funding received

$

10,614,500

DNR

Detroit

Tri-Centennial State Park & Harbor - Dry Dock Improvements Phase IV, remove portions of the berm next to the dry dock

180 days after funding received

450 days after funding received

$

1,380,000

DNR

Garden

Fayette Historic State Park - Historical Structure Renovations

Historic town site building renovations, replacements and upgrades.

30 days after funding received

450 days after funding received

$

2,300,000

DNR

Ontonagon

Porcupine Mts Wilderness State Park

Historic Cabins (17) restoration

30 days after funding received

450 days after funding received

$

51,000

DNR

Carp Lake

Wilderness State Park - Historical Structure Renovations

Historic Trailside Shelters Repair/Restoration

30 days after funding received

450 days after funding received

$

80,000

DNR

Cedar River

Wells State Park - Historical Structure Renovations

Roof replacement, timber and stone renovations to three (3) trailside shelters.

30 days after funding received

450 days after funding received

$

287,500

DNR

Crystal Falls

Bewabic State Park - Historical Structure Renovations

Historic Structures & Stone Fireplaces Repair/Restoration

30 days after funding received

450 days after funding received

$

45,000

DNR

Copper Harbor

Fort Wilkins Historic State Park - Historical Structure Renovations

Historic fort structures renovations, replacements and upgrades.

30 days after funding received

450 days after funding received

$

230,000

DNR

Onaway

Onaway State Park

Structural rehabilitation to the West shelter

30 days after funding received

450 days after funding received

$

201,250

DNR

Ludington

Ludington State Park

Repair/restore historic trailside shelters (3)

30 days after funding received

450 days after funding received

$

105,000

DNR

Detroit

Tri-Centennial State Park - Outdoor Interpretation

Tri-Centennial SP - Phase II, Interpretive nodes

90 days after funding received

450 days after funding received

$

2,070,000

DNR

Harrison Township

Selfridge Boat Access Site -Seawall Repairs

Selfridge Boat Access Site-Seawall - seawall repairing and parking lot paving

90 days after funding received

450 days after funding received

$

1,500,000

02262009

ub

S

A T

O N

R d

e t t

t i m

st

e u

eq

s

O R

Submitted Requests - Not Approved

PP

Route (Infrastructure Only)

1098 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DNR MDOT MDOT MDOT MDOT MDOT MDOT MDOT

Ironwood Township AlconaAlconaAlgerAlleganAlleganAlleganAllegan-

MDOT

Antrim-

MDOT MDOT

ArenacBaraga-

MDOT MDOT

Bay/MidlandGladwin-

MDOT

Gogebic-

MDOT

Houghton-

MDOT MDOT

HoughtonBaraga-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

HoughtonHoughtonIronKeweenawLivingstonMarquetteMarquetteMarquette-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

MarquetteMarquetteMuskegonOntonagonOntonagonOtsegoOttawaArenac-

MDOT

Bay/Arenac-

MDOT

Clare-

MDOT

Genesee-

MDOT MDOT MDOT MDOT

GeneseeHuronHuronHuron-

02262009

Project Name

Project Description

Oman Creek Boat Access Site Paving

Start Date

Oman Creek Boat Access Site - dredging and redevelopment M-65 to O'Donnell Road-Hot Mix Asphalt Crush and Shape Everett Road to Black River Road-HMA crack relief layer Chatham to Munising-Guardrai I-196 over 71st Street-Overlay-Deep Glenn Rest Area-Reconstruction from 71st St to 118th Avenue-Unbonded Conc Overlay from 71st St to 118th Avenue-Cable Guardrai Central Lake S. village limits to South Eckhardt Rd-Crush & Shape, HMA, paved shoulders Twining Carpool Parking Lot and the Standish Carpool Lot-Mill & Resurface Existing Lot Delenes Jct to Bovine-HMA Overlay

90 days after funding received 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

300,000 2,700,000 4,350,000 430,000 585,000 2,500,000 24,700,000 1,000,000

D VE

M-72 US-23 M-94 I-196 I-196 I-196 I-196

PP

$ $

100,000 Various 1,998,000 US-41

5/15/2009 5/15/2009

$ $

750,000 US-10 185,875 M-18

5/15/2009

$

2,370,000 US-45

5/15/2009

$

3,039,138 US-41

Henwood Road to Calumet Street-Partial Milling, 0HMA Overlay & Widen Shoulders Falls River to Menge Creek Road-HMA Overlay From Portage Lake Golf Course to South of Cliff Drive-HMA Overlay with Detail 7 Joint Repairs Baraga CL to Ohotonen Road-HMA Overlay US-2 to Basilio Rd.-Guardrail Cedar Creek-Culvert lining At Burkhart Road-New Carpool Lot US-41 to Division & Greenwood to Gold-Microsurface M-553 to A Avenue & 5th St to US-41-Double Chipseal w/Overband Big Creek Rd. to M-28-HMA Overlay with / Det 7 & 8 Washington Street to Northwoods Road-Mill and Resurface with Det 7 & Det 8 Joint Repairs Cherry Creek Rd to Bayou St and South Marquette-Concrete Jt. Repai Under Fruitport Road/under Russell Road-Overlay Silver City easterly to Ontonagon-HMA resurfacing with 8' shoulde US-45 to Houghton County Line-Guardrai from west of Birch Street to Rowan Street-Streetscape M-104 East to 68th Avenue-Mill/Fil US-23 over Big Creek-Scour Countermeasures & Railing Repair M-13 from M-247 to Standish; US-23 from Standish to the Arenac/Iosco County LinePaved Shoulders

5/15/2009 5/15/2009

$ $

911,000 M-26 350,000 US-41

5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

$ $ $ $ $ $ $ $

549,000 470,000 300,000 80,000 150,000 320,000 894,000 645,000

5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 6/15/2009

$ $ $ $ $ $ $ $

477,000 400,000 1,412,000 4,850,000 350,000 390,681 2,791,000 150,000

6/15/2009

$

4,000,000 M-13/US-23

East of Washington Street to Farwell-Continue Pere Marquette Non-Motorized Trail Fenton Carpool Parking Lot(US-23) & Columbiaville Carpool Parking Lot(M-24)Resurface Existing Lot M-21 to M-57 and M-13 over Mistequay Creek-Mill & HMA Overlay with Joints and Epoxy Overlay Tuscola/Huron COL to South Village Limits Sebewaing- 8' Paved Shoulde Stein Road to Brown Park- 8' Paved Shoulder Weaver Road to WVL of Port Austin- 8' Paved Shoulder

6/15/2009

$

6/15/2009

$

6/15/2009 6/15/2009 6/15/2009 6/15/2009

$ $ $ $

s

t s e

O N

u q e

R d

b u S

O R

$ $ $ $ $ $ $ $

1,500,000 M-88

5/15/2009 5/15/2009

A T

i m

450 days after funding received

Funding Request

Route (Infrastructure Only)

$

EB/WB US-10 over I-75; 9Mile, Mackinaw Rd, Ashman, 3 Mile, Garfield, Waldo, Stark, Sturgeion, 11 Mile & Jefferson over US-10-Misc Bridge Rehab Three locations in Beaverton-Nonmotorized Path w/Lighting State line northerly to the Gogebic/Ontonagon county line-HMA cold milling and resurfacing and shoulder widening Shelden Ave. from Franklin St. to Bridge St.- Enhancements for Economic Development

e t tt

Expected Completion Date

Submitted Requests - Not Approved

US-41 US-41 US-141 M-26 M-59 M-28 BR M-94 US-41 US-41 US-41/M-28 I-96/US-31 M-64 M-26 M-32 I-96 US-23

850,000 Pere Marquette 97,500 various 6,625,000 312,000 273,000 390,000

M-13 M-25 M-25 M-25

1099 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT HuronMDOT Ionia-

Project Name

Project Description Quarry Road to Weaver Rd-Mill & Resurface Grand River Avenue north to Sprague Road-Mill/Resur

Start Date 6/15/2009 6/15/2009

MDOT

Isabella-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

IsabellaKalamazooLapeerLapeerMacombMacombMacombMacombMacombMidlandMontcalmMuskegonMuskegonOgemawRoscommon/ Crawford-

MDOT

Saginaw-

MDOT MDOT

Saginaw-Saginaw Sanilac-

Blanchard Road to Shepherd Road, Us-127 over Little Salt River (B01 of 37013-1 & 2)-ASCRL and Two Course HMA Overlay , Scour Countermeasures and Joints on 2 structures Shepherd Road to US-127BR South Junction in Mt. Pleasant-Two Course HMA Overlay I-94/Westnedge-Reconstruction and widening to six lanes Fostoria Carpool Lot-Pave Existing Gravel Lot North Branch Carpool Parking Lot-Resurface Existing Lots At 9 Mile, exit & entrance ramps-Mill & Resurface At 10 Mile, exit & entrance ramps-Mill & Resurface At 23 Mile, exit ramp-HMA Overlay from 33 Mile Rd. to Ashery Creek-Mill & Resurface At Dequindre, exit ramp-HMA Overlay Meridian Road to east of Vance Road-Paved Shoulders Colby Road north to Kendaville Road-Chip Sea M-46 N to Moon Road-Rehab and a roundabou Canada Rd / M-46-Mill/Fill - Detour South Ogemaw County line to Cook Rd-Full depth centerline joint repairs Snow Bowl Road to I-75-Guardrail Upgrade M-46 over Tittabawassee River & M-46 over Overflow East-Railing Replacement, Deck Patchin, Joints Hess to M-46 in the City of Saginaw-HMA Reconstruct with Storm Sewer, Combined Sewer Separation, Watermain, Curb & Gutter NVL of Port Sanilac to Deckerville Road-eight foot' Paved Shoulde

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

SanilacTuscolaVariousWashtenawWayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit WayneWayneWayne-

St. Clair/Sanilac COL to North Leg of M-90-Joint Repair & Two Course HMA Overlay Millington to Vassar-eight foot Paved Shoulder Various-CPM Projects Freer to Parker-Cold-milling and 2-course HMA Seven Bridges over I-96-Deck Replacement Three Bridges over I-96-Deck Replacement X09-82123-Removal of Railroad Structure GTW RR to east of Commor Avenue-Landscaping & Ornamental Fence Outer Dr. to Brady-Resurface - 2 course Vreenland to South WCL-Resurface - 2 course SB from Joy to Plymouth-Patch & Overlay

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

Berrien-Benton Harbor CalhounClintonClintonDickinsonEatonEatonEatonEaton/Ingham-

MDOT MDOT MDOT MDOT

GogebicHillsdaleHillsdaleHillsdale-

T O

b u S

t i m

02262009

6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009

-N

Route (Infrastructure Funding Request Only) $ 1,300,000 M-25 $ 1,445,000 M-66

D VE $

O R

P P A

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

7,400,000 US-127

5,300,000 68,000,000 60,000 33,000 425,000 425,000 475,000 1,500,000 475,000 1,500,000 508,000 4,050,000 200,000 1,334,000 250,000

US-127 I-94 M-24 M-90 I-94 EB I-94 WB I-94 WB M-19 M-59 WB M-20 M-91 M-37 M-37 I-75SB US-127

6/15/2009

$

1,020,000 M-46

6/15/2009 6/15/2009

$ $

8,000,000 M-13 546,000 M-25

6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009 6/15/2009

$ $ $ $ $ $ $ $ $ $ $

3,800,000 468,000 10,000,000 18,400,000 15,500,000 5,000,000 600,000 700,000 4,000,000 2,000,000 1,500,000

US-31 REL between Napier Rd and I-94, I-94 between US-31 REL/I-94 BL and I-196Completion of US-31 freeway, full interchange at I-94/US-31/I-94 BL, and reconstructed & widened I-94 between US-31 and I-196 7/15/2009 from Columbia Ave. north to I-94 BL-Sidewalk and pedestrian signals 7/15/2009 Chandler Road to Peacock Road-Concrete Restoration 7/15/2009 Pratt to Taft-HMA Coldmill and Resurface 7/15/2009 Iron Mountain-Slotted Drain culvert at K-mart intersection 7/15/2009 M-99/M-50 to VHW Home-HMA Coldmill and Resurface 7/15/2009 M-43 to St Joe Hwy-HMA Coldmill and Resurface 7/15/2009 M-50 to Grandvieiw Dr.-HMA Coldmill and Resurface 7/15/2009 I-96 to Cedar Street-Concrete Restoration 7/15/2009

$ $ $ $ $ $ $ $ $

126,000,000 300,000 3,200,000 1,700,000 50,000 1,087,896 595,124 251,000 3,500,000

Gogebic Station to old US-2 west of Watersmeet-HMA cold milling and resurfacing Jonesville EVL to WVL-Mill & Resf M-34 to Church-Mill & Resf State Line to M-34-Mill and Resurface

$ $ $ $

3,525,000 1,200,000 1,905,000 6,875,630

s t s

e u

d e tt

Expected Completion Date

q e R

Submitted Requests - Not Approved

7/15/2009 7/15/2009 7/15/2009 7/15/2009

M-19 M-15 Various I-94 I-96 I-96 I-96 I-75 US-12 US-24 US-24

US-31 REL/I-94 M-96 I-69 Old 27 M-188 M-50 M-99 I-496 US-2 US-12 US-127 US-127

1100 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

HoughtonInghamInghamInghamInghamInghamJacksonJacksonJacksonJackson/LenaweeKentKentLenaweeLenaweeMackinacMackinacMackinacMasonMecostaOntonagonOntonagonOttawaOttawaOttawaShiawasseeWashtenawWashtenawWayne-Detroit Wayne-Detroit WayneWayneWayneWayneWayneWayne-Detroit WayneWayneWayne/OaklandLivingston-

Project Name

02262009

7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009 7/15/2009

M-13 over Kawkawlin River and Pinconning River-Kawkawlin River Bridge: Deep Overlay, Rail Repair, Paint, and Substructure Repair. Pinconning River Bridge: Bridge Replacemen US-12 to Stevensville-Cable Guardrai M-27 to the Little Black River-Mill and resurface, restriping to 3 lane section M-80 to 10 Mile Road-HMA Crush & Shape Luce/Chippewa County Line to M-123 (Eckerman)-HMA Shoulder Paving M-43 to Wacousta Rd-Reconstruct Hallawood to Kimbark (Eaton Rapids)-Streetscape Enhancemen Hallawood to Kimbark (Eaton Rapids)-Cold-milling and 2-course HMA Under M-50-Bridge Replacement thirty one Bridges-Bridge Capital Preventive Maintenance Borgstrom Rd to Luce/Chippewa County Line-HMA Shoulder Paving Dequindre to I-75-HMA Overlay four Bridges on M-59-Deck replacement, overlays

8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009

T O

t s e

u q e

R d

i m

e t tt

Submitted Requests - Not Approved

Start Date

O R

P P A

N s

b u S

BayBerrienCheboyganChippewaChippewaClinton/EatonEatonEatonJacksonVariousLuceOaklandOakland-

Project Description Lake Shore Drive west to Sharon-Guardrail Replacement and Maintenance Strip Paving Meridian Rd. to M-52-HMA Coldmill and Resurface Michigan to Bogue-HMA Coldmill and Resurface Meridian Road to Zimmer Road-HMA Coldmill and Resurface Jackson County Line to Plains Road-HMA Coldmill and Resurface Howell to I-96-Cold-milling and 2-course HMA Chanter to Elliot-Mill & Resf US-127 to S. of Austin Road-Mill & Resf Henry to Ingham Co Line-Mill & Resf M-124 to Hand Hwy-Mill & Resf six Bridges-Jnts, P/H Repl, Zn Pnt Under Post Road-Overlay, P/H South Street to Valley-Mill & Resf Ogden to A&B Railroad-Mill & Resf Mackinac Trail to 3 Mile Road-Mill and Resurface with 5ft shoulder widening M-129 to M-134-Guardrail Brevort Lake Road to Martin Lake Road-HMA Mill and Resurface James Street, in Ludington- 0.48 mi urban mill/resurface Two Bridges-Jnts, P/H Repl, Zn Pnt East of Bruce Crossing- 140' of 36" culvert Ewen-two - 12" storm sewer crossings 80' each Over 48th Avenue-P/H, Substructure Repair Over WB M-11-Jnts, Zn Pnt 148th St E to I-96-Mill, Resurf M-52 to the Shiawassee River-HMA Coldmill and Resurface Jackson Co Line to Freer Road-Mill and Resurface(CPM) Bemis to M-17-Mill and Resurface(CPM) US-24 to I-275-bridge CPM I-94 to M-102-HMA Crack Seal Wayne Rd. to Beech Daly-Ultra Thin Overlay At Ecorse Road-Reconstruct Ramps at Ecorse I-275 Interchange-Reconstruct Design/Build At Merriman & Middlebelt-Patch & Overlay US-24 to I-275-two-course mill & resurface, slope restoration, barrier I-75 to Griswold-HMA Crack Seal Sheldon to I-275-Mill & Resurface Heywood to Lotz-Patch & Overlay I-275 Bikeway-Design/Build Reconstruct Brighton-one DMS and 3 CCTV added to job

Expected Completion Date

Funding Request

Route (Infrastructure Only)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

85,000 3,500,000 378,680 528,586 2,500,000 2,000,000 1,080,000 2,240,000 3,770,000 2,265,000 3,700,000 1,450,000 2,365,000 3,490,000 3,700,000 175,000 3,750,000 612,000 900,000 90,000 90,000 740,000 530,000 1,500,000 3,200,000 6,000,000 5,200,000 10,000,000 500,000 2,500,000 4,000,000 30,000,000 5,000,000 45,000,000 500,000 5,000,000 5,250,000 10,000,000 670,000

M-26 I-96 M-43 M-43 US-127 M-52 M--106 M-50 US-127 M-50 Various US-131 M-52 US-223 M-134 M-48 US-2 US-10 US-131 M-28 M-28 I-196 I-96 M-104 I-69 I-94 US-23 I-96 I-75 I-94 I-94 I-94 I-94 ramps I-96 M-10 M-14 US-12 I-275 I-96

$ $ $ $ $ $ $ $ $ $ $ $ $

1,800,000 3,600,000 573,000 4,200,000 3,500,000 45,000,000 699,495 2,100,000 2,856,635 19,000,000 2,100,000 1,000,000 7,400,000

M-13 I-94 US-23 M-129 M-28 I-96 M-50/M-99 M-50/M-99 US-127 Various M-28 I-696 WB/SD M-59

D VE

1101 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT OaklandMDOT OaklandMDOT OaklandMDOT Oakland-Pontiac MDOT OaklandMDOT OaklandMDOT OaklandMDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

TuscolaWayneWayneWayneWayneWayne-Detroit WexfordWayneWayne-Detroit

Project Description EB/WB over GTW Railroad (R-02, R-03)-Deep overlays Opdyke to Crooks-Patch & Overlay two Bridges, University Drive-Crack Sealing Widetrack to Opdyke-Patch & Overlay Woodward Avenue to Cesar Chavez-Patch & Overlay US-24 to M-1 (Woodward Avenue)-Patch & Overlay W. of Middlebelt to M-102-Widen Lanes to 11 ft Bay/Tuscola County Line to Ringle Road-Two Course Hot Mix Asphalt Overlay with Joints At Belleville (3 ramps)-Patch & Overlay At Haggerty - (3 ramps)-Patch & Overlay At Eureka - (4 ramps)-Patch & Overlay At Allen/Northline - (4 ramps)-Patch & Overlay M-10 to Oakland-Concrete Patch & Joint Sealing Over Manistee River-Bridge Replacement on Same Alignment Livernois to Woodrow Wilson-Mill & Resurface Livernoise to Rosa Parks-Ped Safety Improvements

MDOT

Bay-

Squaconning Creek to Hotchkiss Road;M-84 over I-75 (B01 of 09034-1 & -2).-Deep Overlays, Widen, Substructure Repairs and reconstruct I-75 mainline

MDOT

Bay-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

ClareClintonCrawfordDeltaDickinsonEatonGeneseeHillsdaleInghamInghamJacksonJacksonJacksonJacksonKentKentMacombMacombMecosta-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

MonroeOgemawSt. ClairTSC WideTuscolaVan BurenWashtenawWashtenawWayneWayne-

02262009

Project Name

T O

b u S

t i m

8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009

9/15/2009

st

q e R

Submitted Requests - Not Approved

O R

P P A

South of Delta Road to Euclid (gapping out I-75 interchange), M-84 over Squaconning Creek (B01 of 09011) and M-84 over Dutch-Reconstruct roadway (widen 2 to 5 laneswest of I-75; widen from 2 to 2 - 5 lanes east of I-75), bridge replacement and culvert r 9/15/2009 South Harding Road to Cunningham Ave over South Branch Tobacco River-Two Course HMA Overlay, Deck Patching, Joints, Paint, HPR on 2 bridges 9/15/2009 From I-96 to Airport Road in Northwest Lansing-Reconstruct 9/15/2009 NYC RR bridge to N/M-93-Crush & Shape, HMA 9/15/2009 US-2 & US-41 Intersection-Reconstruction 9/15/2009 At M-69-Center Lane for Left Turns 9/15/2009 five Bridges-Deck Replacement, 1 Structure Replacement, 1 Overlay 9/15/2009 M-21 over Mistequay Creek-Deck Replacement 9/15/2009 Calhoun Co Line to Chapel-Rehabilitation 9/15/2009 Under Clemens Road-Deck Replacement 9/15/2009 Over the Grand River-Superstructure Replacement 9/15/2009 Over South Branch Rice Creek-Culvert Replacement 9/15/2009 Boardman Road to Henry Road-Mill and Resurface 9/15/2009 Sargent Road to Wash Co Line-Reconstruction 9/15/2009 Michigan Ave to M-60-Reconstruction 9/15/2009 over The Grand River-Jnts, Sub Patch 9/15/2009 The Grand River E to Church Street-Reconstruct 9/15/2009 Cass to Sunnyview-two- course HMA overlay 9/15/2009 Countywide-Non-Freeway Signing Upgrade 9/15/2009 Mecosta SCL N to 13 Mile Rd-Crush & Shape/HMA Inlay 9/15/2009 State Line to School Road including interchanges(C, B & A Phases)Reconstruct/Conc Repairs 9/15/2009 South Ogemaw County line northerly 4.9 miles-Culvert Rehabilitatio 9/15/2009 Potential discretionary funding - Taylor Road to Miller Rd-Reconstruct - D/B 9/15/2009 TSC Wide-Guardrail Upgrading 9/15/2009 M-81 over the N. Branch of the Cass River-Deep Overlay 9/15/2009 North of Paw Paw-HMA Resurfacing 9/15/2009 Ann Arbor Saline Interchange-Reconstruct 9/15/2009 I-94 to Old US-12-Mill and Resurface 9/15/2009 Sibley to Goddard-Reconstruct 9/15/2009 Sexton Kilfoil Drain-Bridge Replacement 9/15/2009

e u

d e tt

N s

Start Date 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009 8/15/2009

Expected Completion Date $ $ $ $ $ $ $

Funding Request 1,540,000 31,500,000 300,000 13,700,000 2,820,000 6,700,000 4,000,000

$ $ $ $ $ $ $ $ $

8,335,000 750,000 750,000 1,000,000 3,000,000 750,000 3,000,000 3,500,000 850,000

D VE

Route (Infrastructure Only) M-59 M-59 M-59 M-59 US-24 BR US-24 BR M-5 M-25 I-94 ramps I-94 ramps I-75 ramps I-75 ramps M-8 US-131 M-8 M-8

$

18,800,000 I-75

$

17,360,000 M-84

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

7,450,000 30,000,000 6,672,000 2,100,000 350,000 3,000,000 1,000,000 10,130,000 5,000,000 9,000,000 922,733 17,031,140 58,000,000 43,100,000 1,200,000 1,500,000 8,000,000 300,000 35,000,000

M-115 I-69 I-75 US-2 M-95 M-50 M-21 M-60 I-496 M-43 EB M-99 US-127 I-94 I-94 M-11 M-11 M-3 SB M-97 US-131

$ $ $ $ $ $ $ $ $ $

22,000,000 1,750,000 80,000,000 350,000 287,000 3,300,000 7,700,000 3,923,309 57,250,000 1,000,000

US-23 I-75 I-69 Various M-81 M-40 I-94 M-52 M-85 M-85

1102 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT LeelanauMDOT KentMDOT KentMDOT KentMDOT KentMDOT MacombMDOT MacombMDOT

Marquette-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

MarquetteOaklandOaklandOaklandOaklandOaklandOaklandOaklandOakland/WayneOttawa-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

SanilacSt. ClairSt. ClairSt. ClairWayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit WayneWayne-Detroit Wayne-Highland Park Wayne-Highland Park Wayne-Highland Park Wayne-Highland Park Wayne-Detroit Wayne-Detroit Wayne-Detroit WayneWayneWayneWayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-

Project Name

T O

s t s

-N

e u

d e tt

t i m

b u S

02262009

Project Description E. Cedar Run Rd easterly to E. Goodrick Rd.-Passing Relief Lane under Coit Ave-Replace / Enhancement over Lafayette Ave-Replace US-131 E to Fuller Ave-Freeway Lighting Replacemen US-131 E to Fuller Ave-Reconstruct I-75 to Hayes-Slope Restoration Plantings and Single Face Barrie I-696 to 14 Mile Road-two-course HMA Mill & Resurface US-41 from M-28 to Bayou Street; M-28 from US-41 to the RR overpassNonmotorized pathway, pedestrian tunnel and natural plantings Front St and Cherry Creek Intersections-HMA Roundabout at Front & HMA Replacement at Cherry Creek Crooks to Ryan-Reconstruct I-696 to West Quarton Road-Reconstruct East Quarton Road to Long Lake Road-Reeconstruct At 12 Mile Road-Median Reconstruct & Crossovers Square Lake to Orchard Lake-Reconstruct At 12 Mile Road-T & S improve intersection, Signa At 12 Mile Road-Active Speed System M-5 to 12 Mile Road-Reconstruct 40th Ave E to Rush Creek-Jnts, Mill, Resurf Umbreit Road to Sanilac/Huron COL-HMA Overlay & Drainage Improvements with 8' Paved Shoulders Belle River-Bridge Replacement St. Clair Highway to Allington Road-Reconstruc Milwaukee St. to Fisher Rd.-Patch & Overlay/possible 4" white-topping Six Bridges over M-39-one Super Replacement & 5 Deck Replacements Five Bridges over M-39-three Super Replacements & 2 Deck Replacements Four Bridges over M-39-four Deck Replacements Two Bridges over M-39-one Superstructure Repair & 1 Deck Replacement Seven Bridges over M-39-Superstructure Repair Five Bridges over M-39-CPM Second, Hamilton, Woodward, John R-Epoxy Overlay Charest ped brdige over M-8-Paint, Deck patch Joseph Campau over M-8-Deck Replacement Goddard over M-8-Deck Replacement Sanders, Pleasant and NS RR-three Bridge Replacements Three RR Bridges-Substructure Repair #NAME? -DMS Replacement - 35 Signs -Detection System Replacement - 100 sites #NAME? Jefferson Outlet-Pump Station D14-82194 Schaefer Highway - Ford Gate 10-Pump Station D12-82022 At Seldon-Pump Station D06-82111 At Milwaukee-Pump Station D01-82112 At Woodingham-Pump Station D12-82112 M-153 to I-94-Concrete Crack & Joint Sealing McNichols to M-153-Mill & Resurface McNichols to M-10-Overlay, joint, crack repair, mill & resurface. Oakland to Conant-Mill & Resurface Oakwood to Schaefer-Reconstruct M-3 to M-102-Mill & Resurface - 2 course Livernois to Rosa Parks-Mill & Resurface - 2 course SB near Downtown Detroit-Active Speed System EB @ I-96 EB & WB-Active Speed System

q e R

Submitted Requests - Not Approved

Start Date 9/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009

Expected Completion Date

10/15/2009

$ $ $ $ $ $ $

10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009

P P A

O R

10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009

Funding Request 2,600,000 4,600,000 4,420,000 2,325,000 19,500,000 15,000,000 7,500,000

D VE $

Route (Infrastructure Only) M-72 I-196 I-196 I-196 I-196 I-696 WB/SD M-97

1,800,000 US-41 and M-28

$ $ $ $ $ $ $ $ $ $

2,150,000 60,000,000 40,000,000 20,000,000 1,390,000 12,000,000 600,000 850,000 30,000,000 2,948,000

US-41/M-28 M-59 US-24 US-24 US-24 US-24 NB M-1 M-5 US-24 M-121

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

2,150,000 5,310,000 18,500,000 5,000,000 14,800,000 10,000,000 7,000,000 3,000,000 1,200,000 4,000,000 1,250,000 400,000 2,000,000 2,300,000 18,000,000 700,000 4,430,000 7,000,000 1,000,000 7,000,000 2,200,000 1,260,000 1,350,000 1,350,000 1,350,000 470,000 4,016,000 14,500,000 13,000,000 38,000,000 6,000,000 10,000,000 850,000 850,000

M-25 I-94 I-94 M-25 M-39 M-39 M-39 M-39 M-39 M-39 M-8 M-8 M-8 M-8 M-85 M-85 I-94 Region Region Region I-75 I-94 M-10 M-10 M-10 M-39 M-39 M-39 M-8 M-85 M-97 US-12 I-375 I-94

1103 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT WayneMDOT Wayne/Oakland-

Project Name

Project Description WB @ I-96 EB & WB-Active Speed System M-10 to M-153-Slope Restoration and single face barrier

Start Date 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 10/15/2009 11/15/2009

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

variousvariousvariousvariousvariousvariousvariousWayne-Detroit OaklandKent-

MDOT

Bay-

MDOT

Berrien-Benton Harbor

Grand Rapids to Livingston County Line-Center to Center communication project US-131 to I-275-Fiber and conduit Indiana State Line to US-131-ITS corridor I-94 to I-75-ITS corridor Davison Hwy to I-94-Close gap in current MITS system US-31 to US-131-ITS connection Ohio State Line to South Detroit-ITS connection M-14 to I-75-ITS Modernization/In-fil US-24 to I-75-Reconstruct US-131 E to Fuller Ave-Widen M-13 Connector/Wilder Road to Arenac/Bay COL-Reconstruct pavement, miscellaneous structure major rehabilitation Potential discretionary funding - S.W. MI Regional Airport - Benton Harbor-Construct runway 9/27 and parallel taxiway extension

MDOT

Berrien-

Potential discretionary funding - Three Oaks to State Line - 2nd Main -- AmtrakReduce railroad congestion and emissions; siding extension from 2 miles to 9.6 miles

MDOT MDOT

BerrienLivingston-

MDOT

Calhoun-

Potential discretionary funding - ITCS Coverage to State Line -- Amtrak-Reduce railroad congestion and emissions; extend ITCS from MP 216 to MP 223 nine Bridges in Brighton TSC area-Bridge Capital Preventive Maintenance Potential discretionary funding - W.K. Kellogg Airport - Battle Creek-Construct Phase I of new runway 5L/23R

Cass-

Potential discretionary funding - Dowagiac Siding Extension to Glenwood -- AmtrakReduce railroad congestion and emissions; connect two sidings to form a 9.6 mile siding

MDOT MDOT

Cass/BerrienChippewa-

Potential discretionary funding - Dowagiac Siding Extension to Niles -- AmtrakReduce railroad congestion and emissions; connect two sidings to form a 14.2 mile siding Potential discretionary funding - South Saint Mary-Partial Bridge Widening

MDOT MDOT MDOT MDOT

ClintonClinton/ShiawasseeEatonEaton-

MDOT

Eaton-

MDOT

Emmet/Mackinac-

MDOT

-N

ub

Genesee-

MDOT MDOT MDOT

Genesee-Flint IsabellaJackson-

MDOT MDOT

LapeerMissaukee/Osceola-

S

$ $ $ $ $ $ $ $ $ $

13,380,000 14,700,000 9,180,000 20,700,000 780,000 4,020,000 5,820,000 9,400,000 60,000,000 10,200,000

$

75,000,000 I-75

D VE $

$

I-96 I-94 I-94 US-127 I-96 I-96 I-75 I-275 US-24 BR (Dxy) I-196

3,700,000 Aviation

11,300,000 HSR

1,200,000 HSR 4,500,000 Various

$

3,500,000 Aviation

$

7,400,000 HSR

$ $

12,600,000 HSR 10,500,000 I-75

West City Limits to 960 ft. E of W City Limit-Turn Lanes I-69 Bl to M-52-Rubbilize and HMA resurface at Gersham hwy-Replace Culvert and drain work at Hill County Drain-Replace culv w/ box culv

$ $ $ $

153,670 15,700,000 250,000 250,000

Warren Avenue to Battle Creek River Bridge-Resurface I-75 over the Straits of Mackinac (Mackinac Bridge) between the cities of St. Ignace and Mackinaw City.-Cleaning and coating existing structural steel

$

s t s

R d

i m

design/build

Route (Infrastructure Funding Request Only) $ 850,000 I-94 $ 12,000,000 M-39

$ $

eq

e t tt

O R

P P A

e u

MDOT

02262009

T O

Expected Completion Date

I-75 S. Junct to Bristol (was Clio Rd )Hill over I-475,I-475 over Gibson Drain, Maple under SB&NB I-475, Bristol under I-475-Road reconstruction, CPM or Rehabilitation o 4 bridges and 1 culv Potential discretionary funding - East of I-75 to West of Center-Reconstruct Road, Bridge Replacements & Rehabilitations Interchange with US-127-Dual Roundabouts S. of Austin to Riverside-Rehabilitation Over Abandoned CR RR; over Farmers Creek; over Plum Creek-Bridge Removal with Culvert Replacement; Culvert Replacement; Bridge Replacement Potential discretionary funding - Cadillac Area-Track Rehabilitation

Submitted Requests - Not Approved

M-21/State Street Old 78 M-100 M-79 Cochran Avenue (I300,000 69BL)

$

39,100,000 I-75

$

26,400,000 I-475

$ $ $

230,000,000 I-69 5,000,000 M-20 6,750,000 M-50

$ $

3,530,000 M-24 6,000,000 Freight Rail

1104 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

MDOT

Montcalm-

MDOT MDOT MDOT

OaklandShiawasseeStatewide-

Gibson to Van Deines Avenue Van Deines Avenue to Wise-Mill & Resurface, RR improvement Reconstruct & HMA Replacment Potential discretionary funding - Oakland County International Airport-Extend Runways 9L and 9R and parallel taxiways Potential discretionary funding - Owosso area-Railroad Bridge Repai Continuously operating reference system (CORES)-Surveys

MDOT

Wayne/Wash/Jackson/Cal houn/Kalam-

Potential discretionary funding - NS Capital Maintenance Kalamazoo - DearbornReduce railroad congestion and emissions; maintain 135 Miles of track for 79 mph passenger speed

MDOT

Washtenaw/Livingston-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

WayneWayne-Detroit WayneWayneWayne-Detroit Wayne-Detroit Wayne-Detroit Wayne-

MDOT

Wayne-Detroit

MDOT

Wayne-Detroit

MDOT

Wayne-Detroit

MDOT

Wayne-

MDOT MDOT MDOT

WayneWayne-Detroit Wayne-Detroit

Potential discretionary funding - Washtenaw-Livingston Line (WALLY) -- Great Lakes Central-Reduce road congestion and emissions with capital investments in the WALLY Line including track rehab and signal upgrades. Potential discretionary funding - Upgrade CP Townline MP 7.6 CSAO-Reduce road congestion and emissions; new Rail Construction Atwater, Orleans, Riopelle-Riverfront development and infrastructure Dequindre Trail-Non-motorized greenway Riopelle Park-Open space improvements Greektown-Streetscape Lower Woodward Cross Streets-Streetscape Capitol Park-Open space improvements Paradise Valley-Streetscape and open space improvements City of Detroit, Bates Street and Atwater Street-Dock & Terminal project - additional phases

T O

MDOT MDOT

Wayne/WashtenawWexford-

MDOT

Oakland-

MDOT MDOT MDOT MDOT

Arenac/Bay/ SaginawGeneseevariousKent-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT

KentWayne/St. ClairWayneWayneWayneWayneWayne-

ub

tt i m

S

02262009

d e t

N s

st

q e R

Potential discretionary funding - Ann Arbor to Detroit & Howell to Ann Arbor-Reduce road congestion and emissions; rail coach and cab car purchase and rehabilitation for passenger service Potential discretionary funding - Cadillac area-Railroad Bridge Repai

Potential discretionary funding - City of Troy/City of Birmingham-Passenger Facility -Amtrak-Construct environmentally friendly intermodal transportation center 19 locations predominantly on I-75-Towers, DMS, Cameras, and Detection: continuation of ITS projects from Metro region north I-69, I-75 & I-475-Phase 2 of Genesee Cnty ITS Project various-Install dynamic message signs at 29 locations from I-196 to I-96-Install fiber/conduit improvements various-Set up IP devices MITS to BWB-Install fiber connection three tower locations-protective and security fencing MITSC-Fiber ring various-Conduit and fiber backbone MITSC Tower Node 8-replace communications tower MITSC Tower Hub 10-replace communications tower

Submitted Requests - Not Approved

Funding Request

$

O R

Route (Infrastructure Only)

2,803,000 M-91

D VE $ $ $

P P A

Potential discretionary funding - Potential discretionary funding - Vinewood Universal Crossover - CN-Reduce railroad congestion and emissions; construct universal crossover Potential discretionary funding - Crossover at West Detroit - CSAO-Reduce railroad congestion and emissions; construct crossover Potential discretionary funding - Track Upgrades Main 1 & 2 - CSAO-reduce railroad congestion and emissions; replace ties and rail primarily on Main 2 Potential discretionary funding - Forty five MPH Crossover - MP 19.8 - NS-reduce railroad congestion and emissions; construct crossover Livernois Interchange-Design Plaza Ramp and Local Ramp Work Jefferson to Grand Blvd.-Reconstruction

e u

Expected Completion Date

1,500,000 Aviation 340,000 25,000,000 Various

$

9,200,000 HSR

$

7,100,000 Rail

$ $ $ $ $ $ $ $

1,000,000 5,000,000 1,000,000 350,000 10,000,000 3,300,000 600,000 2,500,000

HSR Greenways Greenways Greenways Greenways Greenways Greenways Greenways

$

8,783,093 Marine

$

2,500,000 HSR

$

4,500,000 HSR

$

3,000,000 HSR

$ $ $

2,700,000 HSR 1,270,000 I-75 35,000,000 M-1

$ $

6,000,000 HSR 350,000 Freight Rail

$

6,500,000 HSR

$ $ $ $

2,716,500 2,035,000 6,900,000 1,400,000

$ $ $ $ $ $ $

310,000 15,605,000 45,000 6,190,496 6,394,000 1,580,000 1,580,000

I-75 I-75/I-475, I-69 Various M-6 US-131, I-196, I-96 ITS ITS ITS ITS ITS ITS

1105 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT WayneMDOT WayneMDOT OaklandMDOT OaklandMDOT OaklandMDOT St. ClairMDOT MDOT CalhounMDOT variousMDOT MDOT MDOT MDOT MDOT

variousvariousvariousInghamWashtenaw-

MDOT MDOT

InghamLivingston-

Project Name

Project Description MITSC Tower Hub 9-replace communications tower MITSC Tower Node 11-replace communications tower Auburn Hills to Genesee County Line-ITS Modernization/In-fi Novi to Livingston County Line-Conduit and fibe Auburn Hills to Genesee County Line-Conduit and fibe BWB to Lapeer County Line-Conduit and fibe #NAME? at I-94 interchange-Install 4 DMS various-Install 10 DMS throughout region

Start Date

-install 7 DMS throughout region various-install RWIS stations at 8 locations throughout region various-Freeway and non-freeway DMS from M-59 to US-127-continuation of ITS projects from Novi to Lansing US-23/M-14, US-23/I94, I-94/M-14, M-52/I-94, US-127/I-94-DMS location I-496/I-69, US-127/I-69, I-69/I-96, US-127/I-496, I-69/M-52, I-96 Portland-DMS location at M-50 and at US-12-DMS location

T O

MDOT

Wayne-

MDOT MDOT

WayneWayne-

MDOT

Wayne-

Potential discretionary funding - Milwaukee Junction-External Railroad Improvements

MDOT MDOT MDOT

WayneWayneWayne-

MDOT

Wayne-

MDOT MDOT MDOT

WayneVariousVarious-

MDOT MDOT MDOT MDOT

BayJackson-

MDOT MDOT MDOT

ShiawasseeWayneLivingston-

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

variousWayne-Detroit St. ClairSt. ClairSt. ClairSt. ClairSt. ClairSt. ClairSt. Clair-

$ $ $ $ $ $ $ $ $

Funding Request 1,580,000 1,580,000 10,400,000 1,560,000 3,900,000 4,680,000 1,800,000 1,240,000 3,038,000

$ $ $ $ $

2,139,000 1,364,000 1,550,000 2,055,000 4,464,000

$ $

4,464,000 various 1,116,000 US-23

D VE

20,000,000 HSR

$ $

2,524,851 Freight Rail 13,635,184 Freight Rail

$

12,568,642 Freight Rail

Potential discretionary funding - Oakwood Junction-External Railroad Improvements Potential discretionary funding - Schaefer-External Railroad Improvements Potential discretionary funding -Vinewood-External Railroad Improvements

$ $ $

3,911,480 Freight Rail 3,799,017 Freight Rail 6,082,876 Freight Rail

Potential discretionary funding - New Rotunda-External Railroad Improvements Potential discretionary funding -Oakwood Junction to Schaefer-External Railroad Improvements Various-Install carpool lot partnership signs at 60 + locations Various-Accelerated traffic signal conversion to LED lamps

$

4,472,558 Freight Rail

$ $ $

12,031,972 Freight Rail 1,000,000 Various 7,000,000 Various

US-10 @ Mackinaw Road-New Interchange with Dual Roundabouts and Bridge at University Dr InterchangeinterchangePotential discretionary funding - City of Jackson -- Amtrak StationPotential discretionary funding - City of Durand -- Amtrak Station-Site Improvement, parking renovation at US-24-Sound wall - Type 1 CSX RR to South of M-59-Mill & Resf I-75 from Auburn Hills to Ohio State Line-I-75 Technology Test Bed Corridor (DSRC along I-75) I-96 under Underwood-Deck Replacement Elmwood, Gratiot, State Streets under BWB-Street Realignment Potential discretionary funding - Port Huron-ROW Potential discretionary funding - Port Huron-ROW Potential discretionary funding - Port Huron-ROW Potential discretionary funding - Port Huron-PE Potential discretionary funding - Port Huron-PE Potential discretionary funding - Port Huron-PE

$ $ $ $

eq

b u S

02262009

-N

Route (Infrastructure Only) ITS ITS I-75 I-96 I-75 I-69 ITS I-69 US-131, I-94 SB I-196, I-94, NB US-31 various various I-96 various

$

s t s

e u

t i m

O R

P P A

Potential discretionary funding - City of Dearborn Passenger Facility -- AmtrakRelocate current rail facility and construct environmentally friendly intermodal transportation center Potential discretionary funding - Potential discretionary funding - Beaubien-External Railroad Improvements Delray-External Railroad Improvements

R d

e t t

Expected Completion Date

Submitted Requests - Not Approved

$ $ $ $ $ $ $ $ $ $ $ $

8,000,000 30,000,000 600,000,000 2,250,000

US-10 I-75 I-75/M-59 HSR

500,000 HSR 3,225,131 I-94 4,500,000 US-23 I-75/I-94/I-696/M28,000,000 39 1,500,000 I-96 1,200,000 BWB 15,000,000 I-94 45,000,000 BWB 25,000,000 I-94/I-69 3,100,000 I-94/I-69 3,500,000 I-94 2,100,000 BWB

1106 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT St. ClairMDOT St. ClairMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT WayneMDOT OaklandMDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

WayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneWayneClare/OsceolaWayne-

MDOT MDOT

WayneClinton/Gratiot-

MDOT MDOT

OsceolaOakland-

MDOT MDOT MDOT

Kalamazoo

MDOT MDOT MDOT MDOT MDOT

Detroit Adrian, City of Adrian, City of Adrian, City of Adrian, City of

02262009

Project Name

Project Description Potential discretionary funding - Port Huron-ROW Potential discretionary funding - Port Huron-PE Potential discretionary funding - Detroit - M-53 Van Dyke-ROW Potential discretionary funding - Detroit - Cass Ave-ROW Potential discretionary funding - Detroit - Gratiot Ave-ROW Potential discretionary funding - Detroit - Cadillac-ROW Potential discretionary funding - Detroit - Mt. Elliot-ROW Potential discretionary funding - Detroit - 2nd Street-ROW Potential discretionary funding - Detroit - Chene-ROW Potential discretionary funding - Detroit - Concord-ROW Potential discretionary funding - Detroit - Brush-ROW Potential discretionary funding - Detroit - French-ROW 8 Mile to M-59-ROW Potential discretionary funding - Between I-75 and Oakwood Ave - DetroitImprovement of the Delray interlocking Potential discretionary funding - I-75-Road & Bridge Design Potential discretionary funding - Detroit - M-53 Van Dyke-Replacemen Potential discretionary funding - Detroit - Cass Ave-Replacemen Potential discretionary funding - Detroit - Gratiot Ave-Replacemen Potential discretionary funding - Detroit - Cadillac-Replacemen Potential discretionary funding - Detroit - Mt. Elliot-Replacemen Potential discretionary funding - Detroit - 2nd Street-Replacemen Potential discretionary funding -Detroit - Chene-Replacemen Potential discretionary funding - Detroit - Concord-Replacemen Potential discretionary funding - Detroit - Brush-Replacemen Potential discretionary funding - Detroit - French-Replacemen Potential discretionary funding -Detroit - M-53 Van Dyke-PE Potential discretionary funding - Detroit - Cass Ave-PE Potential discretionary funding - Detroit - Gratiot Ave-PE Potential discretionary funding - Detroit - Cadillac-PE Potential discretionary funding - Detroit - Mt. Elliot-PE Potential discretionary funding - Detroit - 2nd Street-PE Potential discretionary funding - Detroit - Chene-PE Potential discretionary funding - Detroit - Concord-PE Potential discretionary funding - Detroit - Brush-PE Potential discretionary funding - Detroit - French-PE Farwell to Evart-Continue Pere Marquette Non-Motorized Trai Potential discretionary funding - I-75-ROW Acquisition of Interchange Area

T O

Start Date

t s e

u q e

R d

S

ub

i m

O R

P P A

N s

e t tt

Expected Completion Date $ $ $ $ $ $ $ $ $ $ $ $ $

Funding Request 65,000,000 15,800,000 2,000,000 1,000,000 5,500,000 1,500,000 5,500,000 11,500,000 5,000,000 5,000,000 3,200,000 1,000,000 25,000,000

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

10,908,000 26,840,000 7,887,000 6,031,000 35,411,000 5,046,000 21,886,000 11,914,000 6,732,000 4,512,000 11,468,000 5,066,000 1,145,000 1,069,000 3,856,000 945,000 4,230,000 2,674,000 1,525,000 1,086,000 2,478,000 1,077,000 3,500,000 62,000,000

D VE

Route (Infrastructure Only) BWB BWB I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-75 DIFT DRIC I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 I-94 Pere Marquette DRIC

Potential discretionary funding - NS Rail Line-ROW Acquisition of Railroad Spur St. Johns to Ithaca-Highway to limited acess freeway

$ $

11,000,000 DRIC 275,000,000 US-127

US-10, from W. Osceola County Line to US-131 (1.91 miles)-Cold Mill, Partial Crack Relief Layer, HMA Resurfacing, Safety Improvements at ramp terminal Potential discretionary funding - 8 Mile to M-59-PE

$ $

1,495,000 US-10 85,000,000 I-75

Potential discretionary funding - from M-45 to I-96-New crossing of Grand River Potential discretionary funding - Environmental Clearance Potential discretionary funding - Construct Rail Station Platform

$ $ $

150,000,000 M-231 8,000,000 US-23 4,000,000

Potential discretionary funding - BRT Corridor on Gratiot from Woodward to M-59 (2) Med Duty Buses (1) Cutaway Bus Bus Tires Mobile Radios

$ $ $ $ $

314,000,000 174,000 63,000 8,000 17,500

Submitted Requests - Not Approved

1107 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT Adrian, City of MDOT Adrian, City of MDOT Adrian, City of MDOT Allegan County MDOT Allegan County MDOT Allegan County MDOT Allegan County MDOT Allegan County MDOT Allegan County MDOT Allegan County MDOT Allegan County MDOT Alma, City of MDOT ALTRAN MDOT ALTRAN MDOT ALTRAN MDOT ALTRAN MDOT ALTRAN MDOT ALTRAN MDOT ALTRAN MDOT ALTRAN MDOT Antrim County MDOT Antrim County MDOT Bay Metropolitan MDOT Bay Metropolitan MDOT Bay Metropolitan MDOT Barry County MDOT Barry County MDOT Barry County MDOT Barry County MDOT Barry County MDOT Barry County MDOT

Bay Area Transportation

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

Bay Area Transportation Bay Metropolitan Bay Metropolitan Bay Metropolitan Bay Metropolitan Bay Metropolitan Belding, City of Belding, City of Belding, City of Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp. Benzie County Transp.

Project Name

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Funding Request 7,000 21,000 28,000 72,000 260,000 695,000 950,000 75,000 17,000 9,500 11,000 160,000 200,000 130,000 195,000 6,000 33,000 27,200 15,000 3,600 200,000 2,560 168,000 30,000 60,000 28,000 49,000 295,000 29,000 15,000 53,000

(15) Cutaway Buses

$

1,020,000

(9) Medium Duty Buses (8) Lift Vans Replace Concrete Back Up Power System Communication Equip Computer Hardware/Software Heating/Cooling System Exterior Lights Fire Suppression System (5) Cutaway Buses (6) Medium Duty Buses Building Purchase Building Renovation Passenger Shelters GPS Radios GPS Vehicle Computers Communications Equipment Office Equipment Office Furniture Maintenance Equipment Truck with Plow

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

990,000 336,000 20,250 45,000 150,750 4,500 45,000 50,000 50,000 350,000 690,000 700,000 400,000 30,000 50,000 50,000 50,000 50,000 10,000 20,000 25,000

Telephone System Dispatch Hardware/Software Lubrication System (2) Minivans (4) Cutaway Buses Maintenance Shop Vehicle Storage Generator Video Surveillance Vehicle Lifts Air Compressor (2) Cutaway Buses (2) Medium Duty Buses (2) Cutaway Buses (3) Cutaway Buses - Exp Trolley Rehab Facility Upgrades Maintenance Tools Computer Dispatch Bike Racks (4) Buses Computer (4) Lift Vans (1) Non LIft Vans Replace Concrete (1) Minivan (1) Raised Roof Minivan (1) 34 ft. Bus Repair Exterior Block Brake Lathe Base and Mobile Radios

Start Date

O R

T O

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

Project Description

Expected Completion Date

Submitted Requests - Not Approved

P P A

Route (Infrastructure Only)

D VE

1108 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT Big Rapids, City of MDOT Branch County MDOT Branch County MDOT Branch County MDOT Branch County MDOT Branch County MDOT Cadillac/Wexord TA MDOT Cadillac/Wexord TA MDOT Cadillac/Wexord TA MDOT Caro, City of MDOT Caro, City of MDOT Charlevoix County MDOT Charlevoix County MDOT Charlevoix County MDOT Charlevoix County MDOT Charlevoix County MDOT Charlevoix County MDOT Cheboygan County MDOT Clare County MDOT MDOT Clinton Area Transit MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT Crawford County TA MDOT MDOT MDOT MDOT MDOT MDOT Delta Area TA MDOT MDOT MDOT Eaton County TA MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT Eastern Upper Peninsula MDOT TA MDOT Gladwin County MDOT Gogebic County MDOT Gogebic County MDOT Greenville, City of MDOT Hancock, City of MDOT Hancock, City of

Project Name

Start Date

O R

T O

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

Project Description (7) Buses (2) Cutaway Buses (1) Van (3) Medium Duty Buses Security System Radio Equipment (4) Medium Duty Buses Facility Completion Operational Equipment (1) Cutaway Bus Computer System (4) Cutaway Buses (2) Medium Duty A & E Maintenance Shop Computer System Phone System Maintenance Equipment (2) Medium Duty Buses (6) Buses Facility Construction (2) Cutaway Buses - replace (4) Cutaway Buses - exp Land Maintenance Truck Bus Washer Generator Hoist Shelters Bike Racks (3) Medium Duty Buses (2) Vans (3) Vans with lifts Radio Systems Radio Tower Security Cameras (6) Medium Duty Buses Facility Improvement Bus Washer (6) Cutaway Buses (3) Medium Duty Buses (1) Cutaway - Expansion (3) Cutaways - Exp (4) Minivans w Lifts - Exp Facility Improvement Office Furniture Maintenance Tools Service Truck

Expected Completion Date

(1) Cutaway Bus (5) Medium Duty Buses (1) Cutaway Bus (7) Passenger Shelters Hydraulic Lift (1) Cutaway - Exp Facility Construction

Submitted Requests - Not Approved

P P A

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Funding Request 770,000 126,000 21,000 273,000 15,000 30,000 500,000 2,000,000 26,784 65,000 20,000 160,000 220,000 25,000 17,500 4,500 8,500 228,000 642,000 2,540,000 150,000 300,000 125,000 55,000 24,000 24,000 45,000 90,000 52,500 345,000 80,000 120,000 33,245 70,000 37,865 600,000 35,000 100,000 426,000 300,000 71,000 215,000 150,000 1,000,000 40,000 400,000 45,000

$ $ $ $ $ $ $

68,000 535,000 68,000 84,000 20,000 70,000 120,000

Route (Infrastructure Only)

D VE

1109 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT Hancock, City of MDOT Hancock, City of MDOT Hancock, City of MDOT Hancock, City of MDOT Hancock, City of MDOT Hillsdale, City of MDOT Hillsdale, City of MDOT Hillsdale, City of MDOT Houghton, City of MDOT Houghton, City of MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Huron County MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Ionia, City of MDOT Iosco County MDOT Iosco County MDOT Iosco County MDOT Iosco County MDOT Interurban TA MDOT Interurban TA MDOT Interurban TA MDOT Interurban TA MDOT Isabella County TA MDOT Isabella County TA MDOT Isabella County TA MDOT Isabella County TA MDOT Isabella County TA MDOT Isabella County TA MDOT Jackson TA MDOT Jackson TA MDOT Jackson TA

Project Name

Start Date

O R

T O

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

Project Description Copier Radios and Base Station Generator Pickup with Plow Support Vehicle (1) Medium Duty Buses Facility Construction Engine (2) Medium Duty Buses Facility Improvements (7) Medium Duty Buses Facility Improvements Parking Lot Tire Equipment GPS/AVL Computers Dispatch Software Fluid Dispenser Computers Tractor Powerwasher Hand Tools Electronic Scan Software Hoist Replacement Flooring Replacement Communication Equipment Video Replacement Office Furnishings Breakroom Furnishings Support Vehicles (2) Cutaway Buses Front Door - ADA Garage Door Upgrades Parking Lot Heating/Mechanica SIB Repayment Communication Equip Fiber Optic Interconnectivity Copy Machine/Computers (2) Medium Duty Buses Repair Asphalt Cameras Computers Facility Renovation Facility Renovation - Operations Office Equipment Maintenance Equipment (7) Medium Duty Buses Utility Storage Building Door Panels Bus Wash Replacement Service Vehicle Aerial Lift (6) Minivans (15) Med Hvy Duty Buses Expand Storage/Work Area

Expected Completion Date

Submitted Requests - Not Approved

P P A

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Funding Request 7,000 20,000 10,000 35,000 34,000 90,000 350,000 17,000 230,000 7,000 945,000 140,000 90,000 35,000 250,000 100,000 25,000 20,000 35,000 25,000 28,000 50,000 45,000 45,000 250,000 145,000 20,000 10,000 70,000 160,000 12,000 12,000 50,000 30,000 166,468 240,000 125,000 12,500 232,000 15,000 2,000 15,000 100,000 54,000 6,000 40,000 840,000 100,000 20,000 180,000 90,000 38,000 240,000 753,750 600,000

Route (Infrastructure Only)

D VE

1110 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT Jackson TA MDOT Jackson TA MDOT Kalkaska Public TA MDOT Kalkaska Public TA MDOT Kalkaska Public TA MDOT Kalkaska Public TA MDOT Kalkaska Public TA MDOT Kalkaska Public TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Greater Lapeer TA MDOT Lenawee County MDOT Lenawee County MDOT Lenawee County MDOT Lenawee County MDOT Lenawee County MDOT Lenawee County MDOT Ludington Mass TA MDOT Ludington Mass TA MDOT Manistee County MDOT Manistee County MDOT Manistee County MDOT Manistee County MDOT Manistee County MDOT Marquette County TA MDOT Marquette County TA MDOT Marquette County TA MDOT Marquette County TA MDOT Marquette County TA MDOT Marquette County TA MDOT Marquette County TA MDOT Marquette County TA MDOT Marshall, City of MDOT Mecosta/Osceola TA MDOT Mecosta/Osceola TA MDOT Mecosta/Osceola TA MDOT Mecosta/Osceola TA MDOT Mecosta/Osceola TA MDOT Midland County MDOT Midland County MDOT Midland County MDOT Midland County MDOT Midland County MDOT Ogemaw County MDOT Ogemaw County MDOT Ogemaw County MDOT Ogemaw County MDOT Ontonagon TA

Project Name

Start Date

O R

T O

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

Project Description Mill and Overlay Parking Lot Hardware/Software Replace. (1) Cutaway Bus (1) Van (1) Medium Duty Bus (1) Med Heavy Duty Bus Fueling Station Facility Improvements (3) Cutaway Buses 40' x 155' Garage Addition 1,300 ft. of 6ft. High Fence On Site Fueling Station Upgrade Security System Vehicle Wash System Remodal Training Room Upgrade Garage Lighting Install Ice Guards On Roof Portable Lifts Vehicle Rehab Facility Improvements Telephone System Tires Radios Dispatch software/hardware (4) Medium Duty Buses (1) Cutaway Bus Facility Improvements Phone System Wheel Balancer/Tire Changer Power Generator GPS System (6) Medium Duty Buses (3) Large Buses (1) Van New Facility Parking Lot Furniture Dispatch Software Employee Scheduling Soft. Tire Balancer Facility Expansion Pave Parking Lot Radio Equipment Computers/Software Security System (7) Cutaway Buses Bus Storage Repave Parking Lot Portable Lifts Bus Security Cameras (1) Medium Duty Bus (2) Cutaway Buses Generator Computerized Dispatching (1) Cutaway Bus

Expected Completion Date

Submitted Requests - Not Approved

P P A

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Funding Request 150,000 60,000 52,000 36,000 120,000 175,000 1,000,000 140,000 210,000 606,000 40,000 240,000 6,500 150,000 20,000 85,000 10,000 35,000 15,000 15,000 7,000 10,000 22,500 21,000 380,000 75,000 30,000 10,000 10,000 30,000 15,000 708,000 1,560,000 35,000 375,000 150,000 100,000 5,000 5,000 3,000 500,000 31,250 46,000 10,000 11,000 525,000 375,000 35,000 36,000 32,000 115,000 140,000 20,000 12,000 62,000

Route (Infrastructure Only)

D VE

1111 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT Otsego County TA

Project Name

Project Description (6) Medium Duty Buses

$

Funding Request 630,000

$

840,000

MDOT

Roscommon County TA

(14) Cutaway Buses*

MDOT

Roscommon County TA

(1) Medium Duty Bus

MDOT

Roscommon County TA

BioFueling Station

MDOT

Roscommon County TA

Truck with Plow

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

Roscommon County TA Sanilac County Sanilac County Sanilac County Sanilac County Sanilac County Sanilac County Sault Ste. Marie, City of Sault Ste. Marie, City of Shiawasee Area TA Shiawasee Area TA Shiawasee Area TA SMART SMART SMART SMART St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA St. Joseph County TA ThunderBay TA ThunderBay TA ThunderBay TA Van Buren County Van Buren County Van Buren County Van Buren County Van Buren County Yates Township Yates Township Yates Township Yates Township Yates Township Yates Township Yates Township Yates Township

Computers (1) Medium Duty Bus - Repl (1) Medium Duty Bus - Exp Facility Construction Bus Wash Security System Misc Equipment (1) Cutaway Bus Equipment Maintenance Storage Canopy for Buses Bike Racks Facility Renovation (3) Hybrid Support Vehicles Hybrid Service Truck Vehicle Technology (1) Cutaway Bus (3) Cutaway Buses Roof Repair Bus Storage Improvement Heating/AC Improvements Van Barn Doors Garage Improvements Office Improvements Phone System Water Softner & Iron Filter Computer Maintenance Equipment Support Vehicle (13) Medium Duty Buses (1) Cutaway (1) Van (1) Cutaway (1) Medium Duty Truck w/ Plow Electronic Routing Onboard AVL/Dispatch (9) Med. Hvy Duty Buses - Exp Automatic Gates Roof Improvements Signage Parking Lot Sealed Parking Lot Improvements Security Cameras Computers

O R

T O

N s

t s e

u q e

R d

e t tt

i m

b u S

02262009

Start Date

Expected Completion Date

Submitted Requests - Not Approved

P P A

D VE $

130,000

$

187,000

$

47,000

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

43,000 125,000 125,000 350,000 200,000 35,000 25,000 70,000 12,000 88,750 185,000 6,300 338,000 39,000 16,900 117,000 23,157 165,000 2,000 9,202 6,656 6,994 23,000 13,290 25,000 3,000 1,200 9,568 23,157 1,495,000 70,000 18,000 65,000 125,000 40,000 45,000 45,000 1,440,000 10,000 20,000 5,000 4,000 4,000 20,000 13,000

Route (Infrastructure Only)

1112 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township MDOT Yates Township MDOT Yates Township Upper Peninsula, Kent DNR County

Adams Township Adams Township

City of Algonac

City of Algonac

City of Algonac

City of Algonac

City of Algonac

Mine Reclamation and Repair

City of Algonac

City of Algonac

City of Algonac

208,000

180 days from funding

1 year from funding

Paving of the parking lot at the new township hall and installing lights. Plans are completed, gravel is compacted and the site is ready for pavement. Site plan has been approved by the planning commmission.

As soon as weather permits

Fall of 2009

$

150,000

Construct a broadband tower to incourage growth is this rural township

July of 2009

August of 2009

$

50,000

7/18/2009

$

280,000 City wide

11/18/2009

$

1,700,000 State Street

P P A

O R

D VE

11/18/2009

$

800,000 City wide

Washington Street watermain replacement

Replace approximately 5,000 linear feet of 4" water main with an 8" water main . The existing water main does not have adequate hydrants along the length of main. System has had numerous breaks and existing flows do not meet fire flow requirements. A new water main would allow for additional fire hydrants providing better fire protection and create better overall pressure. 8/18/2009

11/18/2009

$

875,000 Washington Street

200,000 gallon water tank restoration

The existing water storage tank requires maintenance including painting interior and exterior surfaces, and safety upgrades to the structure. The storage tank has been in service for twenty years without requiring resurfacing or major structural repairs. 8/18/2009

10/18/2009

$

200,000 Water Plant

10/18/2009

$

100,000 Columbia Street

8/18/2009

$

400,000 Water Plant

8/18/2009

$

100,000 Water Plant

Water meter upgrades

Replacement of three mechanical water meters with new ultra sonic meter flow readers. The current meters are located underground within a closed confined vault. City employees are required to enter the system to read meters. This requires specia training and equipment to enter. The City wants to upgrade to meters that can be read from ground level. The new meter requires no mechanical parts or on-going costly maintenance to it's citizens. 5/18/2009

8/18/2009

$

125,000 City wide

City Hall Renovations

Renovate the existing City Hall Municipal building including Administration and Police areas totaling approximately 7,000 square feet. The proposed improvements include HVAC duct adjustments and cleaning, replacement of exterior windows and doors, and insulation for walls and roof. The existing building is almost 30 years old and suffers from inefficient use of work space, safety concerns for Police areas, and existing systems with poor energy efficiency and performance. Energy use studies indicate a staggering potential savings in the operation cost for aging facilities with similar improvements. 5/18/2009

11/18/2009

$

St. Clair River 325,000 Drive

City of Algonac

Water membrane replacements

City of Algonac

City of Algonac

Plant air compressor replacement

itt

m b u

S 02262009

$

Total Mine Reclamation / Repair Costs

5/18/2009

City of Algonac

City of Algonac

Funding Request 24,800 24,500

Sanitary sewer rehabilitation

500,000 gallon water tank restoration

City of Algonac

$ $

Route (Infrastructure Only)

The city has currently invested in video taping the sewer lines throughout and have begun repairs when the budget permits. The City would like to complete the repairs by lining the existing sewer with pipe liners. This project will reduce the amount of treated sewage at the waste water plant, which decreases costs and provides additional capacity to the existing plant.

City of Algonac

City of Algonac

Start Date

The stations require city workers to enter into a closed confined structure for Sanitary sewer pump station and control panel maintenance and repairs. The stations will be replaced with new wet well systems, improvements newer energy efficient pumps, and control panels meeting current state requirements. 5/18/2009 Reconstruct approximately 3,300 feet of road with new concrete curb and gutter, State Street Reconstruction asphalt pavement, pedestrian walks and storm sewer drainage. 6/18/2009

City of Algonac

City of Algonac

Project Description Bike Racks Service Vehicle

Adams Township Hillsdale County Parking Lot Adams Township Hillsdale County Broadband Tower

City of Algonac

City of Algonac

Project Name

Expected Completion Date

d e t

T O

st

e u

q e R

N s

The existing water storage tank requires maintenance including painting interior and exterior surfaces. The storage tank has been in service for fifteen years without requiring resurfacing. 8/18/2009 Replace filter membranes at the water plant, purchase new bubble integrity and sonic testing equipment. 6/18/2009 A new air compressor will reduce energy cost for the city and improve the efficiency of the water filter system. 5/18/2009

Submitted Requests - Not Approved

1113 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

City of Alma

City of Alma

Alma

Alma

Alma

Project Name

City of Alma

Alma

Alma

02262009

Start Date

Bridge Structure at Pine River

The existing two span bridge structure located on Bridge Avenue crossing the Pine River is presently listed on the MDOT critical bridge list for repairs and reconstruction. Deterioration of the structure has resulted in reduced load limits being imposed and the FSR reduced to its present rating of 38.1.The bridge structure requires replacement of the deck, superstructure, and the replacement or restoration of the mid-span piers of the sub-structure. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed May 2009. 6/15/2009

W. Superior Street Reconstruction

Reconstruction of W. Superior Street from West City Limits to Charles Avenue (0.53 miles), which is the only access to the City from the westward direction. The existing street is a major city street with an ADT of 10,000; that is presently two lanes and has a Paser rating of 5. Reconstruction would include concrete curb and gutters, improvement to the storm sewer system, replacement of the street sub-structure, new HMA surfaces and increasing street width at the intersections with two other major streets (Luce Road and Charles Avenue) to three lanes for a center turn lane to increase safety. Street width would also be increase the entire length of the project for the inclusion of two “non-motorized” bicycle lanes”. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in April of 2009. 6/15/2009

S. Lincoln Ave Reconstruction

O R

D VE

859,000 MDOT

9/15/2009

$

860,000 MDOT

Reconstruction of S. Lincoln Avenue from the south City Limits to Marshall Street (0.50 miles), which is the only access to the City from the southward direction. The existing street is a major city street with an ADT of 5,000; that is presently two lanes and has a Paser rating of 2. Reconstruction would include installation of concrete curb and gutters, improvements to the storm sewer system, replacement of the street substructure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in April of 2009. 6/15/2009

9/15/2009

$

809,000 MDOT

2009 Capital Improvement Project

Reconstruction of Prospect Avenue from Center Street north to Ammi Street (026 miles) and the resurfacing two blocks of Pine Avenue from Walnut Street north to Washington (.024 miles). The existing street (Prospect) is a major city street located in the central business district; and has a Paser rating of 2. Pine Avenue is also a major street within the City and is the principle route to the area High School and Middle School which experiences poor drainage issues. Reconstruction would include replacement of concrete curb and gutters as required, improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in March of 2009. 6/1/2009

9/1/2009

$

430,000 MDOT

2010 Capital Improvement Project

Reconstruction of Golfside Drive from Superior Street south to Riverview Drive (0.37 miles) and Pineview Court from Riverview Drive southward (0.06 miles). Both streets are city local streets with a Paser rating of 4 for Golfside Drive and a Paser rating of 3 for Pineview Court. Reconstruction on Pineview Court would include replacement of concrete curb and gutters as required, improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Reconstruction on Riverview Drive would include improvements to the storm sewer system, replacement of the street sub-structure and new HMA surfaces. Topo work on this project has been completed and design engineering is currently under way and is expected to be completed in March of 2009. 6/1/2009

9/1/2009

$

345,000 MDOT

t i m

b u S

T O

s t s

P P A

-N

e u

q e R

Submitted Requests - Not Approved

12/15/2009

Funding Request

Route (Infrastructure Only)

$

d e tt

City of Alma

Project Description

Expected Completion Date

1114 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

City of Alma

Alma

Arcada Twp

Project Name

Project Description

Start Date

Expected Completion Date

2010 Sanitary Sewer Replacement

Replacement of sanitary sewer main adjacent to the east side of the Pine River from the north side of Superior Street to the south side of the Mid-Michigan RR tracks. The existing sanitary sewer starts as a twenty inch diameter pipe and flows into a fifteen inch pipe and finally into a 30 inch sewer main. This project would replace the existing fifteen inch pipe with a continuous 20 inch sanitary sewer to the existing 30 inch. The project would reduce sewer backup and overflows during high flow periods. Approximately 900 linear feet of sanitary sewer would be replaced and two bores would be required to cross the RR tracks and the state trunk line of B.R. 127. 6/1/2009

Runway 18/36 Rehab Project

The rehab of the 3200’ north/south runway 18/36 and Taxiway B is currently under design and would be ready to go in the time frame specified. The project is part of the Gratiot Community Airport’s Five Year Development Plan. The project involves mill and resurface of the runway and taxiway, crack repair and grooving the runway surface. The Gratiot Community Airport Commission in the last five years has focused on raising revenues and improving current facilities and not construction any new facilities. 6/15/2009

Alma Riverfront Brownfield Project

O R

D VE $

160,000 MDEQ

9/15/2009

$

495,000 MDOT

The Alma Riverfront Brownfield Project is the final phase of removing the remaining contaminated soil in the Alma Downtown Riverfront Redevelopment Project Area. The goal of this long-term project is to reclaim the Mill Pond Riverfront from its history of industrial usage, to create a mixed used development for commercial, retail, recreation and residential living. This development would be like no other in the Mid Michigan area. With funding from an SEP Project, CMI Grant, DEQ Loan, EPA Cleanup Grant and Local Funding the City of Alma as accomplished: The environmental study of the riverfront area, Community Master Planning and Concept drawings for the riverfront, purchase of property, demolition of the existing structures and removal of contaminated soils. A major component of the project was to move outdated Alma Iron and Metal facility (Metal Recycler) off the riverfront and relocating them to a more appropriate area on the former Total Refinery property (this site also considered a brownfield). This piece of the project allowed Alma Iron and Metal to build a brand new facility with today’s current environmental standards and expanded 6/1/2009

10/31/2009

$

270,000 MDEQ

This summer working with MDOT the City of Alma completed the first phase of a downtown streetscape. Part of the streetscape included replacement of 36 of the thirty year old mercury vapor lights with new historically significant LED lights. The new LED lights use only 10% of the power the current mercury vapor lights use. Also the light fixture itself is estimated to last 15 years before it needs replacement, saving on maintenance costs. The style of the new lights has also been approved by the Michigan Historic Preservation Office as significant to the downtown of Alma. There is great energy savings potential in replacing the remaining 141 mercury vapor lights owned by the City of Alma in the Downtown District, with the new LED lights. The engineering for this project could be completed by April 15, 2009, and installation by September 30, 2009. 6/1/2009

11/15/2009

$

680,000 MDOT

9/1/2009

$

240,000

T O

P P A

10/1/2009

Funding Request

Route (Infrastructure Only)

N s

t s e

City of Alma

City of Alma

City of Alma

Alma

Alma

Alma

02262009

u q e

R d

i m

e t tt

S

ub

Downtown Street Lighting Project

Alterations to the existing Municipal Building that was constructed in 1976 to reduce energy consumption. Retrofit insulation into walls and ceiling areas of the existing structure. Replace existing windows, and install weather stripping; upgrade existing Municipal Bldg Energy Improvements Project mechanical equipment and insulate the existing ductwork.

Submitted Requests - Not Approved

7/1/2009

1115 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Alma

Alma

Project Name

Project Description

Start Date

Expected Completion Date

Wright Ave Roundabout

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

State Street Roundabout

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

10/1/2009

$

500,000 MDOT

10/1/2009

$

500,000 MDOT

Pine Avenue Roundabout

In 2004 the City of Alma hired Dan Burden of Walkable Communities Inc. to meet with the community over two days and discuss ideas to make Alma more pedestrian and bicycle friendly. Taking the ideas from the multiple day charrette the community converted the downtown one way street system back to a two way street system. Another interesting idea that came out of the discussion was the idea to convert three intersections in the downtown area to roundabouts. The City Commission then hired an architectural firm to do some conceptual designs for the intersections of Pine Avenue, State Street, and Wright Avenue. The roundabouts will create center piece for the downtown area, increase safety, and will also lower the emission for cars because they to not have to sit at the lighted intersection waiting for the light to turn green. Since there are no lights at the intersection there is energy and maintenance savings for the City and State of Michigan. This will continue the downtown’s move to green technology, with the installation of LED streetlights and roundabouts. Project would include removal of the existing traffic signal and road surfaces; installation of co 8/1/2009

10/1/2009

$

500,000 MDOT

Water Plant Warehouse Project

Construction of a 40x50 warehouse for the water treatment plant. Warehouse to be used for equipment storage and storage of water distribution repair components such as water valves, and pipe. 8/1/2009

12/31/2009

$

90,000

Sanitary Infiltration & Inflow Project

Project to reduce the infiltration and inflow of ground water and storm water into the sanitary sewer system. Line the interior of existing sanitary sewer mains in the area of Lift Station #8 and repair sanitary sewer manholes to prevent infiltration. Line approximately 10,000 linear feet of sanitary sewer and reconstruction of twenty sanitary manholes. 7/1/2009

9/1/2009

$

500,000

T O

N s

City of Alma

Alma

d e tt

City of Alma

City of Alma

City of Alma

Alma

Alma

Alma

02262009

t i m

S

ub

t s e

qu

e R

Submitted Requests - Not Approved

1116 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

City of Alma

Arcada Twp

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

Runway 9/27 (east/west) is Gratiot Community Airport’s 5,000 foot main runway. In 2005 the east portion (runway 27) of the parallel taxiway was completed. The Airport Commission planned to complete the west portion (runway 9) of the taxiway when funds were available. The taxiway would be 2000 foot long and improves the operational safety of the runways by eliminating the need for backtaxiing on runway 9/27. The completion of the taxiway is also important as the airport moves to a WAAS system for GPS landings. The taxiway will allow the approaches to the runways to be lowered, making it safer to land. The new system will lower the current navigational maintenance costs for the airport. The taxiway project was scheduled as a 2010 project if there were enough AIP funds from the Federal Government available. The airport is a very important tool for rebuilding the County’s economic base and in 2009 Gratiot Community Airport will become an airport authority. The authority will contain the current owners the City of Alma and Gratiot County. The new Construction of Parallel Taxiway members of the authority will be City of St. Louis, City of Ithaca, Pine River Township a6/15/2009 S. Port Crescent Sanitary Sewer Replacement Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project (Valentine to Fair) Route by approximately 60% Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Fair Street Sanitary Sewer Replacement Route by approximately 60% Fair/Schwalm Street Sanitary Sewer Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project interconnector Replacement Route by approximately 60% Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Schwalm Street Sanitary Sewer Replacement Route by approximately 60% Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Davis Street Sanitary Sewer Replacement Route by approximately 60% Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Soper Road Sanitary Sewer Replacement Route by approximately 60% S. Port Crescent Sanitary Sewer Replacement Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project (Schwalm to Soper) Route by approximately 60%

City of Bad Axe

Roof Drain/Sump Pump Sanitary Sewer Disconnect, in association with Sanitary Sewer Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Replacements Fair/Schwalm Street Area Route by approximately 60%

$

City of Bad Axe

S. Port Crescent South St to E. Huron Ave. Sanitary Manhole and Service Lead Replacements

Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Route

$

37,600 S. Port Crescent

City of Bad Axe

N. Port Crescent E. Huron Ave to Watkins Pl. Sanitary Manhole and Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Service Lead Replacements Route

$

139,000 N. Port Crescent

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

City of Bad Axe

T O

02262009

itt

d e t

q e R

m b u

S

City of Bad Axe

-N

e u

City of Bad Axe

City of Bad Axe

s t s

P P A

O R 9/15/2009

D VE $

625,000 MDOT

$

100,000 Rearlot

$

113,000 Fair St

$

24,000 Rearlot

$

130,000 Schwalm St

$

52,000 Davis St.

$

58,500 Soper Road

$

91,500 Rearlot

112,500

Court St. S. Port Crescent to Heisterman Sanitary Manhole and Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Service Lead Replacements Route

$

65,000 Court St.

South St. S. Port Crescent to Heisterman Sanitary Manhole and Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Service Lead Replacements Route

$

38,100 South St.

South St. Heisterman to Hanselman Sanitary Manhole and Service Lead Replacements

$

60,500 South St.

Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Route

Submitted Requests - Not Approved

1117 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

City of Bad Axe

Alley north of E. Huron Ave N. Port Crescent to Scott St. Sanitary Manhole and Service Lead Replacements

City of Bad Axe

City of Bad Axe

North St. E. Huron Ave to Hilton St Sanitary Manhole and Service Lead Replacements

City of Westland City of Westland City of Westland

Westland Westland Westland

Drain Disconnect Program City Sanitary Sewer CIP Norwayne Sewer CIP

City of Westland City of Westland

Westland Westland

Warren Rd/Newburgh Rd Intersection Wayne Highlands Drainage Project

City of Westland

Westland

City of Westland City of Westland

Westland Westland

Norma Street Reconstruction Newburgh Rd Preventative Maintenance program Flamingo St Reconstruction

City of Westland

Westland

Avondale Re-paving

City of Westland

Westland

Gravel Road Paving

City of Westland

Westland

Florence St Drainage

City of Westland City of Westland City of Westland City of Westland

Westland Westland Westland Westland

Cherry Hill and Newburgh Rd Intersection Randy St. Resurface & reconstruction Grand Traverse Pavement Replacement Mathew St Reconstruction

City of Bad Axe

Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Route

Sanitary Sewer Reconstruction Project, to reduce Inflow and Infiltration along Project Route Disconnect 1,000 homes from footing drain discharge going into the sanitary sewer system and reduced treated cfs. Replace old and failing infrastructure of the City's sanitary sewer system Reduction of cfs in CSO are 37 based on sanitary sewer SSES study Modernize the intersection with pavement replacement and traffic signal improvements Pave existing roads and improve storm sewer system to reduce flooding Replace existing pavement with 9" concrete cross-section and repair existing infrastructure problems Rehabilitate Newburgh Rd with joint sealing, over banding, concrete base repair, and overlay Replace existing road pavement and address any public utility issues

O R 8/1/2009 7/1/2009 7/1/2009

165,300 Alley

$

218,500 North St.

D VE $ $ $

10,000,000 3,000,000 1,000,000

$ $

565,000 2,200,000

4/1/2009

5/1/2009

$

1,700,000

4/1/2009 4/1/2009

6/1/2009 5/1/2009

$ $

1,200,000 898,400

4/1/2009

8/1/2009

$

860,000

4/1/2009

7/1/2009

$

10,230,000

4/1/2009

6/1/2009

$

669,000

4/1/2009 4/1/2009 4/1/2009 4/1/2009

6/1/2009 5/1/2009 7/1/2009 5/1/2009

$ $ $ $

500,000 350,000 1,000,000 1,743,000

4/1/2009

5/1/2009

$

2,400,000

4/1/2009

5/1/2009

$

350,000

4/1/2009 4/1/2009 4/1/2009

5/1/2009 5/1/2009 4/1/2009

$ $ $

700,000 200,000 120,000

4/1/2009

6/1/2009

Public Facility Renovations- Dorsey Center

4/1/2009

5/1/2009

Public Facility Renovations - Senior Center Central City Park Remediation Central City Park Concession building replacement

4/1/2009 4/1/2009

5/1/2009 6/1/2009

4/1/2009

6/1/2009

A T

City of Westland

Westland

Increase Patrol Vehicles

City of Westland City of Westland City of Westland

Westland Westland Westland

Increase Emergency Dispatchers In-car Computer Replacements Police Station Computer Replacements

City of Westland

Westland

Public Facility Renovations - Fire Station #5

City of Westland

Westland

City of Westland City of Westland

Westland Westland

City of Westland

Westland

tt i m

O N

Replace existing failing public road with new pavement and sub-base section Pave all gravel roads throughout city with 4"/8" bituminous pavement or 7" concrete pavement and construct proper storm sewers Correct existing drainage problems and flooding with new proposed pavement and storm sewer Upgrade signal to incorporate a left hand turn lane on eastbound Cherry Hill and replace existing pavement Select slab replacement with full depth reconstruction of existing pavemen Replace existing failing public road with new pavement and sub-base Replace failing road pavement, water main, sanitary, and storm sewer

s

st

e u

q e R

Increase Patrol Officers

d e t

4/1/2009 4/1/2009

Hire 20 police officers to bolster patrol response, to have fulltime crime suppression on each shift, provide school resource officer and add additional community police officers. Purchase 10 fully marked scout cars that will be fully complimented with current electronic equipment Hire 8 emergency dispatchers that will provide service for two communities and cover both Police and Fire Departments Replace 30 In-car computers with new up to date modems Replace 30 Police station Pc's

ub

Submitted Requests - Not Approved

Route (Infrastructure Only)

$

6/1/2009 7/1/2009

Westland

S

4/1/2009 4/1/2009 4/1/2009

Funding Request

PP

City of Westland

02262009

Start Date

Expected Completion Date

1118 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lutheran Child & Family Services of Michigan

Farmington Hills

Project Name

Project Description

Start Date

Photovoltaic Panels BGR

Installation of Photovoltaic Panels on the Maintenance Building in the back section of the developed campus at Boys and Girls Republic.. This is a 3-step project which will reduce emissions and reduce costs. The steps include re-roofing the maintenance building; installing of a 3.6k W grid tied photovoltaic system on the south facing roof located above the Maintenance Building; installing Naturalite Daylighting tubes in the gymnasium building, computer lab building and the kitchen/dininghall building to reduce energy consumption in those buildings, making the Photovoltaic system more effective. This photovoltaic system will off-set a portion of the energy consumption in the computer lab, kitchen/dining hall building, school building, gymnasium building, and the maintenance building. Energy generated and not used will sold back to the power grid.

Lutheran Child & Family Services of Michigan

Lutheran Child & Family Services of Michigan

Farmington Hills

Farmington Hills

Reconstruction of Center Drive and BGR.

The Center Driveway is the access road over the Ravine Drain on Boys and Girls Republic's campus. The waterway, Noble Brook, is a tributary of the Rouge River. The road has been eroding at the crossing, causing half the road to be shut down and creating a dangerous situation for motorists and maintenance personnel. The road is in generally poor condition and requires reconstruction for approximately 300 feet either side of the crossing. The drain has begun to erode into the road embankment north of the crossing. Measures have been taken to slow the erosion, but a permanent fix is needed. Preliminary discussions have been held with MDEQ, plans and specifications have been developed for reconstruction of the access drive, realignment of the drain to prevent further erosion of the road embankments and coordination of permitting of the project by MDEQ and other regulatory agencies. The project will benefit the environment by eliminating the erosion and preserving the tributary of the Rouge; it will benefit the agency by sustaining infrastructure of the 80 acre campus.

$

240,600

Solar Water Heating/BGR

Installation of solar water heating systems for three residential buildings which house up to 80 residents on BGR's campus. Each system includes: 8 solar panels 4 x 8 selective surface, mounted flush on south facing residence hall roofs; one 200 gallon solar storage tank; one AC solar boiler package -- heat exchanger, pump, controls; all installation labor, pipe, valves, fittings, insulation for complete job. The complete, installed system is sized to save $6,300 per year at 2009 gas rates with savings increase as utility rates rise; and it reduces energy consumption.

$

39,024

The back of the developed campus house 5 buildings, 3 of which are not cabled for computer networking. Ultimately, cabling will allow those with offices in these buildings to be networked to the agency's statewide system and to have inernet access, both of which are essential to doing business, especially as part of a statewide agency. Use of e-mail also reduces energy consumption by reducing the use of paper in memos, reports, etc., and reducing the use of fuel, since webinars with multiple participants may be carried on via inernet rather than having to travel to a central location. The project includes Plenum type cable, cable testing, termination, wall plates, wall jacks, and patch panel as well as the labor involved.

$

13,169

d e tt

b u S

02262009

BGR Campus Cabling

N s

st

e u

q e R

P P A

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE 135,242

t i m

Farmington Hills

O R

Funding Request

$

T O

Lutheran Child & Family Services of Michigan

Expected Completion Date

1119 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lutheran Child & Family Services of Michigan

Lutheran Child & Family Services of Michigan

Lutheran Child & Family Services of Michigan

Lutheran Child & Family Services of Michigan

Lutheran Child & Family Services of Michigan Lutheran Child & Family Services of Michigan

Lutheran Child & Family Services of Michigan

Farmington Hills

Farmington Hills

Oak Park

Oak Park

Bay City

02262009

Start Date

McElroy Generator

Residential Generators

This project includes the installation of 8 circuit transfer switches in the electrical rooms of each of three residential units (housing up to 80 youth); backup of one circuit from upstairs panel in each unit; installation of generator receptacle on the exterior of each building and the purchase of three portable generators and extension cords.

PP

O R

Funding Request

62,364

$

4,704

Kreft Windows

Removal and replacement of 7,000 sq. ft. of existing glass as well as aluminum framing in the Metro-Detroit Regional Headquarters, the Kreft Building. This include Kawneer 2250 curtain wall framing with black anodized finish; 1" O.A. grey insulated glass with low E coating and matching 1" insulated spandrel glass; perimeter caulking at interior and exterior as required; narrow stile aluminum door (1) with standard hardware at South stairwell entrance; demolition and removal of all existing glass and framing including overnight temporary weather protection.

$

627,600

Heat System Upgrade

Project includes disconnecting and removing 2 existing boilers and installing 4 Lochinvar Knight boilers which are 95% efficient; installing Smart System Operating Controls which are Energy Star Qualified; piping in primary and secondary piping; connecting the boilers to the existing gas piping; reconnecting to existing electrical system, venting the boilers in PVC through existing roof openings; piping condensate to the floor drain in the boiler room; disposing of the old boilers; testing, starting and adjusting equipment for optimum performance and providing parts and labor warranties.

$

131,423

Kreft Generator

Includes installing a Baldor #IDLC200-3JDB 200K W Diesel fueled generator, three phase 120/208v and a Thompson Technologies 800 amp service rated three phase transfer switch; installing a concrete pad behind the building near DTE's transformer for the generator to sit on; provision of a diesel fuel allowance of 365 gallons @ $3.65 per gallon; and materials and labor to rework the underground raceway from the DTE's transformer to the building main distribution panel into the automatic service rated 800 amp transfer switch.

$

80,070

Kreft Lighting

Upgrading the lighting in the Kreft Building includes removing all existing T-12, 4-lamp 2 x 4 lay-in fluorescent fixtures and disposing of them; providing and installing new energy-efficient T-8, 3 lamp 2 x 4 lay-in fluorescent fixtues.

$

55,186

Bay City Light Upgrades

Installation of lighting upgrades to reduce energy consumptionthroughout the building. Furnishing and installing 111 lithonia 2GT8 332 A12 MVOLT 1/3 GEB101S 3 tube 2' x 4' fluorescent suspended ceiling lighting fixture with (3) GE F32T8SP35ECO lamps; 14 2GT8 3 U31 A12 MVOLT 1/3 GEB101S with (3)GE F31T8SPX35U lampsl and one WC2 25 MVOLT GEB101S with 2 GE F25T8SP35ECO lamps.

$

26,125

A T

e u

st

d e t

q e R

s

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

ub

S

Project Description

The McElroy Center Building is an activities center which houses a gym, restrooms, locker rooms, a kitchen and a library. In the event of a power outage, especially one of some length, the building could house the youth and their staff, increasing the safety of the youth in care. The building is already prepped for the installation of a generator. The project includes installing a Guardian #QT 10068, natural gas, 3 phase, 120/208v with a steel enclosure on the rear of the building next to the existing service. The generator will provide approximately 260A of 208V-three phase power for building operation. It will feed the heat, the lighting and general purpose loads, wit the exception of the air conditioning. Additionally, an 800 amp, 120/208v 3 phase Nema 3R automatic transfer switch will be installed; a concrete pad will be provided and installed behind the building for the generator to sit on; the existing air conditionin units will be inerlocked so that they will not function in the event of a utility shut down; natural gas piping from the gas meter to the generator will be installed.

tt i m

Oak Park

Oak Park

Project Name

Expected Completion Date

1120 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Lutheran Child & Family Services of Michigan

State-wide

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

ANTRIM MONTCALM ALLEGAN SAGINAW SAGINAW SAGINAW SAGINAW SAGINAW SAGINAW BERRIEN SAGINAW SAGINAW WAYNE WAYNE KENT WAYNE CLARE GLADWIN OTSEGO SAGINAW HOUGHTON

Replacement of 11 agency vehicles statewide; they range in age from 15 to 8 years old with an average mileage of 110,000 miles per vehicle. They are not fuel efficient. Replacement includes the purchase of 11 vehicles from Ford, Chrysler or GM: 4 biofuel ready 12 passenger vans; 3 hybrid 5 passenger SUVs; 2 fuel efficient 7 passenger mini-vans; 1 fuel efficient pick-up truck; and 1 fuel efficient 5 passenger automobile. SOUTH OF ECKHARDT ROAD TO SOUTH CENTRAL LAKE-CRUSH & SHAPE, RESURFACE Gibson St north to Wise Rd-Mill+Rsrf; HMA Recon & Inlay Jefferson Ave to Kalamazoo Street-Coldmilling & HMA resurfacing I-675 Ramps-Pavement Repairs, HMA Overlay NB and SB over Schaefer Street, Saginaw-Deck Repl, Deep Ovly 19 bridges, I-675 corridor-Deck Repls, Deep Ovlys 21st Street & 11th Street over NB & SB I-675-Bridge Replacement over Saginaw River, Saginaw-Deck Repls I-675 in Saginaw County-Freeway Signing Upgrade State Line to US-12-Reconstruction from S Jct I-75 to N Jct I-75-Upgrade Freeway Lighting under Michigan Road-Replace Joints, P&H, Patching under M-102 EB and WB Service Road-Deck replacement under M-102 (8 Mile Road)-Deck replacement off-ramp to M-21 westbound -Add right turn lane at ramp M-39 (Southfield Freeway) to M-10 (Lodge Freeway)-Mill and Resurface from Pine and E. 4th St, east to Industrial Dr.-Pere Marquette Rail-Trail Ext Three locations in Beaverton-Nonmotorized Path w/Lighting from west of Birch Street to Rowan Street-Streetscape I-675 Corridor-Concrete Pavement Repairs Shelden Ave. from Franklin St. to Bridge St.-Historical Preservation

MDOT MDOT MDOT

State Wide HOUGHTON WAYNE

8 Locations in Berrien, Cass, and Van Buren Co.-Overband Crack Fill M-26, Houghton County-HMA Overlay GTW RR to east of Commer Avenue-Landscaping & Ornamental Fence

MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT MDOT

State Wide State Wide State Wide State Wide State Wide State Wide State Wide State Wide State Wide

Vehicle Upgrade

Expected Completion Date

T O

N s

t s e

u q e

5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

O R

Funding Request

D VE

P P A

$

315,565

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

1,500,000 2,438,661 1,556,000 4,566,665 1,209,896 18,022,921 1,621,953 27,116,236 1,463,551 6,419,524 1,806,031 826,694 2,552,970 19,154,849 1,169,881 839,900 583,780 82,940 386,813 3,485,943 1,225,394

Route (Infrastructure Only)

M-88 M-91 M-89 I-675 I-675 I-675 I-675 I-675 I-675 US-31 SB I-675 I-675 M-10 M-10 I-96 EB M-102 Mid-Michigan RR M-18 M-32 I-675 US-41 M-43, M-51, M873,000 152, I-94BL, 675,000 M-26 604,576 I-75

5/15/2009 5/15/2009 5/15/2009

$ $ $

Various locations through out Superior Region-Install 3 DMS signs and 2 ESS Kalamazoo TSC -Pavement Markings and Rumble S Brighton TSC -Pavement Markings and Rumble S Metro Region-Metro Region Special Markings Marshall TSC-Pavement Markings and Rumble S Jackson TSC-Pavement Markings and Rumble S Metro Region-Pavement Markings and Rumbles Metro Region-wide-ID contract Metro Region Wayne County-Region Wide Pavement Markings

5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009 5/15/2009

$ $ $ $ $ $ $ $ $

1,052,860 702,802 1,556,321 745,291 617,838 588,819 2,148,068 1,655,000 1,534,129

Chapel Rd Water Extension (15,840 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

90 days from start date

$

Chapel Rd from Michigan Ave to 1,030,000 Parks Dr.

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Rd Water Extension (2,000 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

90 days from start date

$

Spring Arbor Rd from Melody to 240,000 Cottage

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

King Rd Water Extension (2,900 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

90 days from start date

$

King Rd from 189,000 Elwood to Chapel

King Rd Water Extension (2,900 Ft.)

12" connector water main to increase flow and pressure for fire supperssion, University growth, and improved water quality from "looping".

210 days from project approval

90 days from start date

$

King Rd from Daggit to Dearing 260,000 Rd

R d

i m

ub

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

S

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

02262009

e t tt

Submitted Requests - Not Approved

Regionwide TSC wide TSC wide Region wide TSC wide TSC wide Region wide Region-wide Countywide

1121 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Project Name

Project Description

Richard St extension

Start Date

This extension will relieve congestion at several intersections on Spring Arbor Rd.

Traffic light at Spring Arbor Rd and Dearing Rd.

Expected Completion Date

This is a very busy intersection that will benefit greatly from a traffic control light

180 days from project approval

180 days from project approval

180 days from start date

Second St. Upgrade

Cap and add bike lane to improve safety for University and senior citizen housing development residents.

90 days from project approval

60 days from start date

Arbor Hgts, Ogle, and Cottage St. Upgrade

Cap and add bike lane to improve safety for University and senior citizen housing development residents.

90 days from project approval

60 days from start date

Second St. pedestrian path

Pedestrian path will provide safe passage for joggers and walkers from the University 90 days from and senior citizen development project approval

60 days from start date

A T

s

O N

PP

$

$

Second St from Chapel to Henderson (4,400 374,000 Ft.)

$

Arbor Hgrs, Ogle, and Cottage St. 340,000 (4,000 Ft.)

$

Second St. from Ogle to Henderson 147,000 (4,200 Ft.)

$

Teft Rd from Spring Arbor Rd to FW Trail (9,800 392,000 Ft.)

Add pedestrian / bike path to provide safe access to a very popular non-motorized trail

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

Dearing Rd Walking / bike path

Add pedestrian / bike path to provide safe passage to Western secondary schools from Spring Arbor and FW Trail. Used by students walkers, joggers, school sport teams.

90 days from project approval

180 days from start date

$

Dearing Rd from Michigan Ave. to Dearing Rd. 655,000 (16,400 Ft.)

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI

King Rd / Spring Arbor Rd Intersection redesign

King Rd intersects with Spring Arbor Rd at a sharp angle which creates a hazzard for 180 days from persons using this route project approval

180 days from start date

$

200,000

Immediate upon approval of project

300 days from start date

$

350,000

180 days from start date

$

Cross Road at 575,000 Sears Rd.

11/1/2009

$

100,000

ASAP

$

1,739,400

September 2009 or six months later $

921,000

Spring Arbor Twp Spring Spring Arbor Township Arbor, MI Spring Arbor Twp Spring Spring Arbor Township Arbor, MI Hubbardston - North Village of Hubbardston Plains Twp.

Replace fire engine

tt i m

q e R

Replace 1985 vintage tanker truck

d e t

Cross Road bridge replacement EEB (Energy Efficient Boiler)

Replace bridge that has been condemned, which isolates several homes from 180 days from Township emergency services project approval Update the Community Center with High Efficiency Boiler System (Multiple Modular Boilers) 9/1/2009 Replace 3 bridges on Ball Creek-Secondary route Casnovia-Kent City-Sparta. Oldest bridges in Kent County ASAP

Village of Kent City

Village of Kent City

White Lake Township

This project will extend the watermains easterly along M59 from Lowe's Home Improvement Center to east of Pontiac Lake Road. Total amount of 8" and 12" diameter water main is 4,193 lineal feet. The project will also provide a small diameter pressure sewer to serve properties along Highland Road and M59 in the M59 East Contract 7 Waterman and Pressure eastern portion of White Lake Township. The total amount of 2" and 3" pressure White Lake Township, MI Sewer sewer is 5,522 lineal feet.

02262009

Ball Creek Bridges

e u

b u S

Submitted Requests - Not Approved

Could begin March 2009

180 days from start date

$

Alter configuration of intersection and install traffic control 100,000 light

Falling Waters Trail Access

st

90 days from project approval

Extend Richard from Wakefield to 125,000 Dearing Rd.

D VE

180 days from start date

O R

Funding Request

Route (Infrastructure Only)

1122 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

White Lake Township

Project Name

Project Description

Start Date

M59 Mideast Contract 8 Watermain and White Lake Township, MI Pressure Sewer

This project will complete the M59 water main loop by constructing 12" and 16" diameter water main from Teggerdine Road easterly to the existing 12" water main at the location of the old Salvation Army building. The project will also loop an 8" water main from the Trainer Law office location to Cranberry Meadows Subdivision. The importance of these watermains is to provide the much needed redundant water supply to the Village Lakes development and to Cranberry Meadows Subdivision. Pressure sewer will be run from the BP gas station at Teggerdine easterly to Brew Bob's bar across from Oxbow Lake. The total amount of 8", 12", and 16" diameter Could begin watermain is estimated at 7,909 lineal feet. August 2009

White Lake Township, MI Western Outlet Sanitary Sewer Extension

This project will allow development of new properties and sewer connection of existing properties, particularly in the lakes areas, in the western portion of White Lake Township. A pressure sewer the length of Bogie Lake Road will provide the trunk sewer while servicing the large Huron Valley Schools K-12 complex which has sewage disposal problems. A lateral pressure sewer along Cedar Island Road and a gravity sewer along Hill Road will provide connection to proposed development properties. The sewer will allow abandonment of the private sewage disposal system of a large mobile home park. Small diameter pressure sewers in the Woods of White Lake development and along M59 are also included. The projects includes Could begin approximately 19,100 feet of 16" diameter pressure trunk sewer as well as 5,125 September 2009 lineal feet of 2" to 6" pressure sewer and 3700 feet of 8" gravity sewer. The survey if engineering for this project is substantially completed and the preliminary design is expected to be approved by completed by the end of February 2009. Township 4/10/2009

White Lake Township, MI Hurondale High Service Pump

The purpose of this project is to pump ground water from the Twin Lakes 1 well southeasterly into the higher pressure south service district which is supported by the one million gallon east elevated storage tank. This will provide a higher supply capacity to fill the tank and will provide a higher quality water to the south service district as the Twin Lakes wells have a substantially lower iron content. This project is located at the intersection of Elizabeth Lake Road and Hurondale. 3/1/2009

T O

White Lake Township

White Lake Township

Expected Completion Date

d e t

White Lake Township, MI Twin Lakes 1 Well House Upgrade Village of South South Rockwood Pump Station (Labo Park) Rockwood Improvements

Village of South Rockwood Village of South Rockwood Village of South Rockwood

Village of South Rockwood Village of South Rockwood Village of South Rockwood Village of South Rockwood

Village of South Rockwood Village of South Rockwood

Village of South Rockwood Village of South Rockwood

02262009

t s e

The secondary well at this 50 plus year old well house is failing and it is necessary to install a new well the same capacity as the primary well. This will require enlarging the building and upgrading all of the electrical to 460 volts as well as changing out the old standy emergency generator. This project is located south of the intersection of M59 and Fisk Road. 3/1/2009 Replace existing sanitary sewer pump station with new precast wet well, pumps, control building and removal of the old pump station 9/1/2009

Upgrade existing sanitary sewer to handle sanitary sewer flows from the Village of South Rockwood. Proposed method of upgrade of the sewer is to convert it to a 10Swallow Drive Sanitary Sewer Upgrade inch and 12-inch force main. 9/1/2009 Edwards Street Sanitary Sewer Pump Station Replace existing sanitary sewer pump station with updated wet well, pumps and Improvements controls 10/1/2009 Reline existing sanitary sewer lines, sanitary manholes along with sanitary sewer Carleton-Rockwood Sanitary Sewer Lining leads to control inflow and infiltration into the system. 7/1/2009

m b u

S

Village of South Rockwood

Sanitary Sewer Cleaning and Lining Project

Water System Upgrades Village Street Upgrades

1,415,000

$

4,134,000

September 2009 or six months later $

199,000

September 2009 or six months later $

363,000

3/1/2010

$

South Huron River 250,000 Drive

3/1/2010

$

200,000 Swallow Drive

5/1/2010

$

9/1/2009

$

250,000 Edwards Street Carleton350,000 Rockwood Road

10/1/2010

$

Various Streets In 750,000 The Village

5/1/2010

$

8/1/2010

$

P P A

qu

e R

Clean and televise existing sanitary sewers within the Village limits. Reline existing sanitary sewers, sanitary manholes, and sewer leads where it has been determined that repairs are required.

10/1/2009

Upgrade existing undersized water mains within the Village limits. As part of the upgrade of the small mains install new gate valves, fire hydrants, and house services. 10/1/2009 Remove and replacement of existing subdivision roads. Upgrade roads to current standards along with drainage improvements. 10/1/2009

Submitted Requests - Not Approved

D VE $

N s

White Lake Township Village of South Rockwood

itt

O R 11/9/2009

Funding Request

Route (Infrastructure Only)

Various Streets In 2,500,000 The Village Various Streets In 3,000,000 The Village

1123 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Ironwood

City of Ironwood City of Ironwood

City of Ironwood

City of Ironwood

City of Ironwood

City of Ironwood

Local Street Overlay Infrastructure Improvement Project Sanitary Sewer Manhole Relining Infrastructure Project Geographic Information System Utility Infrastructure Asset Management

City of Ironwood City of Ironwood

City of Ironwood

City of Ironwood

City of Ironwood

City of Ironwood City of Ironwood

City of Ironwood City of Ironwood

City of Ironwood

City of Ironwood

City of Ironwood City of Ironwood City of Ironwood

City of Ironwood City of Ironwood City of Ironwood

02262009

d e t

Four Seasons Nonmotorized Trail System

itt

City DPW Salt Storage Shed

Replace innefficient and outdated High Lift pumps

6/1/2009

Replace non functioning fire hydrants and water valves

6/1/2009

11/14/2009

O R 12/1/2009

Funding Request

D VE $

$

PP

9/1/2009

6/1/2009

10/1/2009

$

Reline/Replace sanitary sewer manholes to eliminate inflow and infiltration 6/1/2009 Collection of Data and development of an asset management plan for sanitary sewer, storm sewer, and water systems infrastructure. 4/1/2009

10/1/2009

$

12/1/2009

$

50% of local streets identified in the City's Pavement Management 5,250,000 Program Throughout the City 1,100,000 of Ironwood Throughout the City 125,000 of Ironwood

$

Greenbush Street, North of US-2 (portions in city and Ironwood 300,000 Township)

A T

s

t s e

O N

Replacement of deteriorated 8 inch water main

qu

e R

7/15/2009

11/1/2009

$

City of Ironwood Water Pump 400,000 Station Throughout the City 1,500,000 of Ironwood

Provide a backup water main to create redundancy and reliability of municipal water system.

8/1/2009

6/1/2010

$

Replacement of Sanitary Sewer and Water Infrastructure

8/1/2009

7/1/2010

$

Trail development on city-owned open space

5/1/2009

11/1/2009

$

Lake St. from Margaret St. to City 2,500,000 Well Fields Jessieville and 6,000,000 Norrie Locations City-owned open 200,000 space

7/1/2009

9/1/2009

$

240,000

Memorial Building Renovation Longyear Park Restrooms

Building façade improvements Provide facilities at existing Municipal park

6/1/2009 7/1/2009

8/1/2009 10/1/2009

$ $

165,000 80,000

Automated Water Meter Installation

Replace existing water meters with automated meters to improve effciencies Replace Ice making equipment with higher-efficiency equipment and construct water well Replace existing ladder truck Replace existing tandem dump truck

6/1/2009

11/1/2009

$

200,000

7/1/2009 6/1/2009 6/1/2009

10/1/2009 9/1/2009 9/1/2009

$ $ $

250,000 350,000 120,000

Civic Center Renovations Fire Truck - ladder tuck Tandem Dump Trck

Route (Infrastructure Only)

Southwest St.; Clemens St.; Brogan St.; South Range St; Houk St.; Oak St.; Tamarack St.; Pine 3,500,000 St.

Building for storage of road salt

m b u

S

6/1/2009

Improve conditions of failing street infrastructure

City of Ironwood/Ironwood Greenbush Street Water Main Infrastructure Township Replacement Ironwood Township (work would be completed on City of Ironwood's water Back Up Water Transmission Main system) Infrastructure System Improvement Sanitary Sewer Phase II and Phase III City of Ironwood Construction

Start Date

Replacement of Saniary Sewer and Water Infrastructure

In Ironwood Township, on Municpal Water Pump Station Infrastructure city-owned land Updates Fire Hydrant and Valve Infrastructure City of Ironwood Replacement Project

City of Ironwood

City of Ironwood

Project Description

Jessieville Sanitary Sewer and Water Infrastructure Project

City of Ironwood

City of Ironwood

City of Ironwood

Project Name

Expected Completion Date

Submitted Requests - Not Approved

Current DPW Garage (Penokee Rd.) 213 S. Marquette St. Hemlock St. Throughout the City of Ironwood Pat O'Donnel Civic Center none none

1124 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

Project Name

Project Description

Start Date

Elevated Storage Tank Replacement

This project would include the replacement of the City's Elevated Water Storage Tank in the Upper Pressure District. Recent reports have been completed stating that the tank is undersized for its currrent level of use and also is in need of significant structural repair. If left unchecked, this could potentially lead to tank failure. This tank is the sole source of water storage for the City's upper Pressure district for the higher elevation areas away from Little Traverse Bay. 6/1/2009

Bear River Valley Water Main

This project would involve construction of a new 12-inch water main between the Ingalls Pump Station and the Upper Pressure District. Currently, this district is fed water from one water main with no redundancy provided. Previous Water Reliability studies have identified this as a concern and this water main connection would complete the second major loop from the first phase which was completed in 2005. This project will also reduce the long term pumping energy for the pumps that provide water to the upper Pressure District. 6/1/2009

Wastewater Treatment Plant Headworks Improvements

This project would include the replacement of the screening and grit handling equipment at the City's Wastewater Treatment Plant (WWTP). The existing equipment in use at the plant is over 40 years old and badly corroded and in need of extensive repairs. Studies recently completed have suggested that the grinders be replaced with fine screening equipment, which will lead to lower operation and maintenance costs. In addition, the grit handling equipment has been too wet to handle safely and poses an environmental hazard if it leaks from trucks hauling it to landfill. The proposed equipment would provide for a drier material that can safely be hauled to landfill with less potential for liquid leaking from haul trucks. In addition, odo control and structural rehabilitation would be included to provide for extended life of the structure along with new equipment. 9/1/2009

Main Wastewater Lift Station replacement

This project would involve replacement of the City's Main Wastewater lift station. This station is over 40 years old and is in need of serious repair. If the station fails, raw sewage would flow directly into Little Traverse Bay (Lake Michigan) since the station is located directly adjacent to the Bear river about 100 feet from the bay. 9/1/2009

T O

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

eq

12/1/2010

O R

P P A

N s

st

e u

Expected Completion Date

6/1/2010

9/1/2011

9/1/2011

Funding Request

$

All property owned by the City of Petoskey, or is in the City Right-Of1,600,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of400,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of2,200,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of1,800,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of770,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of600,000 Way

D VE

R d

City of Petoskey

City of Petoskey

Lockwood Water Booster Station

This project would involve installation of a booster pumping station at the City's Lockwood Storage Tank. The booster station would pump from the Central Pressure District which serves the lower areas of the City to the Upper Pressure District. This project would also include the construction of a 12-inch water transmission main from near the intersection of Kalamazoo and Spruce streets to Kalamazoo and Atkins. This project provides a redundant feed source of water to the east side of the Bear River and addresses a deficiency outlined in previous reliability studies. This project would also reduce the City's energy consumption for water supply pumping since the pressure required for lifting from this station to the Upper Pressure District is signficantly lower. 9/1/2009

Petoskey East Well

This project would involve installation of a new water supply well for the Upper Pressure District and would help to provide a redundant feed source to the eastern portion of the Upper Pressure District. The project would help to lower the City's energy foootprint since currently, all of the water pumped to the City's Upper Pressure District is pumped twice and the pumping head is signifcantly greater. This well would allow for direct pumping to the Upper Pressure District Storage Tank at significant energy savings. 7/1/2009

i m

b u S

City of Petoskey

City of Petoskey

02262009

e t tt

Submitted Requests - Not Approved

12/1/2010

9/1/2010

Route (Infrastructure Only)

1125 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

02262009

Miscellaneous Wastewater Treatment Plant (WWTP) Facility Improvements

This project would involve miscellaneous improvements to modernize and replace outdated equipment and facilities at the WWTP including expansion of the laboratory space required for monitoring of the water quality discharged from the facility to Little Traverse Bay (Lake Michigan), relocation of the polymer feed and storage facilities, additional maintenance facilities, providing a womens restroom facility and modernization of other employee facilities. 9/1/2009

Kalamazoo Avenue - East Mitchell Street to Lake Street

This project is one (1) City block of total road and utilities reconstruction, including the reconfiguration of a 'hairpin' curve, and replacing this curve with a safer, more vehicular friendly intersection. This work also includes the replacement of water, sanitary sewer and storm sewer utilities, and the placement of a new sidewalk where no sidewalk existed before, thereby opening this area up to pedestrian and handicap access. Trees, lawn and landscaping are also included in this project. 4/15/2009

t i m

ub

A T

s

t s e

O R

PP

O N

9/1/2011

9/1/2011

7/30/2009

Funding Request

This project is over 2600 feet long, and would include total reconstruction of watermain and sanitary sewers, along with the installation of a storm sewer system, including concrete curbs and gutters as well as storm water catch basins. This storm water system would eliminate road run-off into the existing open ditches, which would be eliminated. Also included in this project is new sidewalks where no sidewalks existed before, and the placement of street trees and lawn in the road Right Of Way. 7/15/2009

Atkins Road Extension - Kalamazoo Avenue to Howard Street

This project, which is approximately 2500 feet long, would provide a much needed secondary access to our local community college (North Central Michigan College) for vehicular and pedestrian traffic, along with an alternate access route for emergency vehicles. This project would also include the replacement of watermain, sanitary and storm sewers, along with new sidewalks and extensive landscaping. 5/15/2009

Emmet Street - East Mitchell Street to Washington Street

This project encompasses six (6) City blocks, and would include a much needed road widening, and would replace the watermain and sanitary sewer. This project would also replace the concrete curb and gutter structures, driveway approaches and sidewalks, and would include street tree and lawn replacement. All crosswalks are to be upgraded to be compliant with ADA requirements. 4/5/2009

Submitted Requests - Not Approved

10/15/2010

7/15/2010

10/31/2009

11/15/2009

Route (Infrastructure Only)

D VE $

All property owned by the City of Petoskey, or is in the City Right-Of1,400,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of1,965,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of162,500 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of1,300,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of2,570,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of1,620,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of1,500,000 Way

qu

This project is five (5) City blocks of total road, sidewalks, driveway approaches, and utility reconstruction, including the placement of Americans with Disabilities Act (ADA) compliant handicap ramps and crosswalks. The installation of the new sanitary sewer and watermain utilities would replace utilities that are between 75 and 100 years old, thereby increasing the longevity and integrity of the infrastructure. New street trees and lawn replacement would also be included in this project. 6/1/2009

e R

Greenwood/Cemetery Road - Charlevoix Avenue to the City Limits

S

Start Date

Miscellaneous Wastewater Treatment Plant (WWTP) Energy Improvements

d e tt

City of Petoskey

City of Petoskey

Project Description

This project would involve several energy related improvements with the intent on reducing the overall energy consumption required for treatment including the installation of biogas fueled electrical generators. These generators would make beneficial use of the biogas that is generated in tthe digestion process that is currently burned in a waste gas burner and the electrical energy generated would be used for shaving peak demands at the facilty. The excess heat from the generator would be used to provide heat for the digestion process thus further reducing the use of natural gas. An existing sludge thickener tank would be utilized for additional digestion and a floating cover would be installed to increase gas storage capacity. A new automatic transfer switch would be installed on the existing standby generator and the existing digesters would have the structural concrete rehabilitated and the existing boilers would be retrofit to also enable operation with biogas in addition to natural gas. 9/1/2009

East Lake Street - Division Street to Kalamazoo Avenue

City of Petoskey

City of Petoskey

Project Name

Expected Completion Date

1126 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

City of Petoskey

Project Name

Project Description

Start Date

Emmet Street - Washington Street to East Sheridan Street

This project is one (1) large city block totaling over eleven hundred feet (1100') in length. The work here would include curb, gutter and pavement replacement, along with new watermain, driveway approaches, sidewalks and landscaping in the Right O Way. ADA compliant handicap ramps would also be installed. 7/15/2009

Bay Harbor Fire Station

This project is to build a public safety/fire station on recently aquired property at 3625 South US 31, Petoskey. The location of this facility places all properties in the jurisdictional boundaries of the City with a five (5) mile response radius, as recommended by the Insurance Services Office (ISO), standards for response distance maximums. Currently the City does not meet this response distance rating on properties located on the western edge of the City. The station to be built involves the remodeling of an existing structure to house public safety facilities that will include: visitor lobby, meeting room, offices, squad/day room, exercise room, rest room and the garage area for the storage and parking of squad cars. In addition, a new three (3) bay apparatus area will be attached to the existing building for the parking of fire fighting equipment and vehicles. 6/1/2009

Bear River Valley Recreation Area

Bear River Valley Recreation Area divides the City almost in half.The project area, is an undeveloped valley that is very scenic and quiet. The City is looking to improve access points to the valley for pedestrians, installing non-motorized trail, restrooms, picnic shelters, white water kayak area, along with parking lots, footpaths, benches, etc., and installing conduits to allow for burial of overhead electric transmission lines, and improvements to water and sewer utilities. 6/1/2009

Rail Road Right-of-way purchase

To purchase an abandoned state owned railroad right-of-way, that extends through the City, for use as City park land to enhance access to the downtown area. A portion of the right-of-way will be utilized as a non-motorized trail and plans to use the existing rails for transporting visitors to our downtown shopping area from outlying parking lots utilizing a small motorized trolley currently owned by the City. 7/15/2009

A T

s

t s e

Expected Completion Date

O N

qu

$

All property owned by the City of Petoskey, or is in the City Right-Of700,000 Way

$

All property owned by the City of Petoskey, or is in the City Right-Of2,500,000 Way

6/1/2010

$

All property owned by the City of Petoskey, or is in the City Right-Of3,500,000 Way

11/15/2009

$

1,250,000

11/15/2009

O R

PP

Funding Request

Route (Infrastructure Only)

6/1/2010

D VE

Replacement of single paned windows with energy effcient window in the City's historic Carnegie Library Building

6/1/2009

6/1/2010

$

All property owned by the City of Petoskey, or is in the City Right-Of73,000 Way

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

15,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

15,000

CNCR-0701 Dslam addition

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

15,000

CNCR-M-60 Adtran dslam addition

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

20,000

Camden

CMDN-0102 x-box Adtran dslam addtition

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Onsted

ONST- Marr Hwy Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

20,000

City of Petoskey

City of Petoskey

City of Petoskey Carnegie Library Window replacement

Frontier Communications of Michigan

Concord

CNCR-Pulaski Adtran

Frontier Communications of Michigan

Concord

CNCR- 0411 AFC Dslam addition

Frontier Communications of Michigan

Concord

Frontier Communications of Michigan

Concord

Frontier Communications of Michigan Frontier Communications of Michigan

02262009

d e tt

t i m

S

ub

e R

Submitted Requests - Not Approved

1127 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Frontier Communications of Michigan

Onsted

ONST- Reed Rd dslam addtion

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

North Adams

NADM- Jerome Rd & Addison Rd Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Osseo

OSSE- Culbert & Rumsey Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Osseo

OSSE- Kelso & Jerome Adtran

Deploy Dslam to underserved area

3/15/2009

Frontier Communications of Michigan

Camden

CMDN- 0103 X-box Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Camden

CMDN- Gilmore & Montgomery Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Allen

ALLN- Squires Rd AFC Dslam

Deploy Dslam to underserved area

Frontier Communications of Michigan

Allen

ALLN- 0104 x-box Dslam

Deploy Dslam to underserved area

Frontier Communications of Michigan

Allen

ALLN- Allen to Cambria Fiber build

Install fiber transport for facility relief

Frontier Communications of Michigan

Montgomery

MTGM- 0111 x-box Adtran

Frontier Communications of Michigan

Brooklyn

BKLN- Case Rd Adtran

Frontier Communications of Michigan

Brooklyn

BKLN- 0501 x-box Adtran

Frontier Communications of Michigan

Brooklyn

Frontier Communications of Michigan

Bundy Hill

Frontier Communications of Michigan

Bundy Hill

Frontier Communications of Michigan

Montgomery

Frontier Communications of Michigan Frontier Communications of Michigan

Funding Request

$

D VE

15,000

$

18,000

$

18,000

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

16,000

3/15/2009

9/15/2009

$

15,000

3/15/2009

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

430,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

BKLN- Claremont Ct Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

BNHL- Moscow Rd Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

BNHL- Farwell Lk Rd Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

MTGM- Brown & Hakes Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Allen

ALLN- North Allen Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Osseo

OSSE- 0108 X-box Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

d e tt

t i m

S

ub

02262009

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

1128 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Frontier Communications of Michigan

Osseo

OSSE- 0107 X-box, S, Jerome Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Osseo

OSSE- Skuse & Gilbert Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Onsted

ONST- Deep Lake Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Onsted

ONST- 1001 X-box H.S.I. Cbl feed

Deploy Dslam to underserved area

3/15/2009

Frontier Communications of Michigan

Onsted

ONST- US223 Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Concord

CNCR- Grover & Cochran Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Concord

CNCR- Hubbard & Pulaski Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Concord

CNCR- Hubbard & Luttenton Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Concord

CNCR- King & Albion Adtran

Deploy Dslam to underserved area

Frontier Communications of Michigan

Concord

CNCR- King & N. Concord Adtran

Frontier Communications of Michigan

Cambria

CMBR- Reading & Seamburg Adtran

Frontier Communications of Michigan

Prattville

PRVL- Tuttle & Tamarack Adtran

Frontier Communications of Michigan

Ransom

Frontier Communications of Michigan

Ransom

Frontier Communications of Michigan

Ransom

Frontier Communications of Michigan

Ransom

Frontier Communications of Michigan Frontier Communications of Michigan

Funding Request

$

D VE

18,000

$

18,000

$

18,000

9/15/2009

$

20,000

3/15/2009

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

18,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

RNSM- 0102 X-box Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

RNSM- Pioneer Rd Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

RNSM- Pleasant View & Tripp Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

RNSM- Squawfield w. of Bird Lake Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

North Adams

NADM- Sterling & Knowles Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

Hanover

HNVR- Straight & Hanover Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

$

18,000

02262009

d e tt

t i m

S

ub

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

1129 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Frontier Communications of Michigan

Hanover

HNVR- Bowerman & Sears Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Hanover

HNVR- Snow Rd Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Frontier

FNTR- Montgomery Rd Adtran

Deploy Dslam to underserved area

3/15/2009

9/15/2009

Frontier Communications of Michigan

Frontier

FNTR- Terrirorial Rd Adtran

Deploy Dslam to underserved area

3/15/2009

Frontier Communications of Michigan

Brooklyn

BRLK- Cisco 7206 Router installation

Install additional BRAS for egress relief

Frontier Communications of Michigan

Brooklyn

BRKL- Aggregation upgrade

Install additional Aggregation equipment for relief

Frontier Communications of Michigan

Onsted

ONST- Aggregation upgrade

Install additional Aggregation equipment for relief

Frontier Communications of Michigan

Osseo

OSSE- Aggregation upgrade

Install additional Aggregation equipment for relief

Frontier Communications of Michigan

Concord

CNCR- Aggregation upgrade

Frontier Communications of Michigan

Camden

CMDN- Aggregation upgrade

Frontier Communications of Michigan

Cambria

CMBR- Aggregation upgrade

Frontier Communications of Michigan

Hanover

HNVR- Aggregation upgrade

Arialink

Glenn, Moline, Otsego, Byron Center, Dorr, Wayland, Plainwell, Wayland, Fennville, Hastings, Lawrence, Bangor, Bangor Township, Bloomingdale, Covert, Decatur, Gobles, Hartford, Paw Paw, Lawrence, Mattawan, South Haven, South Haven

b u S

t i m

02262009

d e tt

Funding Request

$

18,000

D VE $

18,000

$

18,000

9/15/2009

$

18,000

3/15/2009

9/15/2009

$

50,000

3/15/2009

9/15/2009

$

30,000

3/15/2009

9/15/2009

$

30,000

3/15/2009

9/15/2009

$

30,000

Install additional Aggregation equipment for relief

3/15/2009

9/15/2009

$

30,000

Install additional Aggregation equipment for relief

3/15/2009

9/15/2009

$

30,000

Install additional Aggregation equipment for relief

3/15/2009

9/15/2009

$

30,000

Install additional Aggregation equipment for relief 3/15/2009 Allegan/VanBuren ISD Wide Area Network - Expansion of construction of a Gigabit fiber-optic network to include public and private school districts in Allegan and VanBuren Counties. 34 school buildings will be impacted by the expansion of the scope of this project. The benefit to the schools will be increased Internet capacities as well private connections to all schools on Arialink's statewide fiber-optic network which will facilitate collaboration, resource sharing and significant capital cost reductions. It is Arialink's belief that this multi-county network will serve as a model for other similar regional collaborative networks, all of which can be tied together to create a true statewide network. The potential short term economic impact of the network is clear; hundreds of jobs will be created in both the public and private sectors. The long term economic impact is perhaps even more exciting, with collaboration that was previously only a dream of the education and government sectors now a very distinct reality. The reduction in capital expenditures that will undoubtedly be realized will allo 3/1/2009

9/15/2009

$

30,000

3/1/2010

$

10,129,375

N s

st

e u

q e R

T O

Submitted Requests - Not Approved

P P A

O R

Route (Infrastructure Only)

1130 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Arialink

Project Name

Project Description

Start Date

Charlotte, Vermontville, Eaton Rapids, Grand Ledge, Potterville

Eaton ISD Wide Area Network - Expansion of construction of a Gigabit fiber-optic network to include public and private school districts in Eaton County. 16 school buildings will be impacted by the expansion of the scope of this project. The benefit to the schools will be increased Internet capacities as well private connections to all schools on Arialink's statewide fiber-optic network which will facilitate collaboration, resource sharing and significant capital cost reductions. It is Arialink's belief that this multi-county network will serve as a model for other similar regional collaborative networks, all of which can be tied together to create a true statewide network. The potential short term economic impact of the network is clear; hundreds of jobs will be created in both the public and private sectors. The long term economic impact is perhaps even more exciting, with collaboration that was previously only a dream of the education and government sectors now a very distinct reality. The reduction in capital expenditures that will undoubtedly be realized will allow budget strapped school distric3/1/2009

Holt, Onondaga, Mason, Lansing, Leslie, Holt, East Lansing, Williamston, Okemos, Webberville, Howell, Fowlerville, Jackson

Ingham ISD Wide Area Network - Expansion of construction of a Gigabit fiber-optic network to include public and private school districts, education-related not for profit institutions and government agencies in Ingham and Livingston Counties. 41 school and government buildings will be impacted by the expansion of the scope of this project. The benefit to the schools will be increased Internet capacities as well private connections to all schools on Arialink's statewide fiber-optic network which will facilitate collaboration, resource sharing and significant capital cost reductions. It is Arialink's belief that this multi-county network will serve as a model for other similar regional collaborative networks, all of which can be tied together to create a true statewide network. The potential short term economic impact of the network is clear; hundreds of jobs will be created in both the public and private sectors. The long term economic impact is perhaps even more exciting, with collaboration that was previously only a dream of the education and government sectors now a very distinct reality. The3/1/2009

A T

Arialink

s

t s e

Expected Completion Date

PP

O R

Funding Request

Route (Infrastructure Only)

D VE

12/31/2009

$

3,358,750

3/1/2010

$

4,025,313

Phase 1 - 240 days max. Phase 2 - 365 days from funding

$

1,909,000

O N

u q e

R d

e t t

t i m

ub

Noordyk Broadcasting, Newaygo County, Inc. dba West Northwest Kent County, Michigan Broadband Northeast Ottowa County West Michigan Broadband

S

02262009

It is our intent to build a high speed wireless broadband network for unserved, rural households in Newaygo County, Southeast Oceana County, Northeast Muskegon County, Northeast Ottawa County and Northwest Kent County. Based upon 2000 census data, this project will reach 67,665 people. This represents 24,065 homes. These households are not being served with high speed broadband service. This network shall be completed using a combination of existing tower structures and a series of new towers that will be seamlessly linked together. Our propagation studies indicate that we can use some existing tower structures. This will allow us to start construction within 30 days of funding. By utilizing existing structures, start up costs will be reduced and completion of this portion of the network will be within 240 days of funding. The 2nd phase of the project will require 4 new tower structures and shall be completed within one year of funding. Immediate

Submitted Requests - Not Approved

1131 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Battle Creek

City of Battle Creek

Goguac Wetland Improvement Project

The City of Battle Creek, through its watershed management plan, has goals of improving storm water quality and of protecting riparian zone vegetation for area waterways. Currently, storm water is discharging directly into a wetland, which is a riparian zone adjacent to Goguac Lake, the City's largest lake, without treatment. The City proposes to pretreat the storm water discharge to protect the wetland from overnutrification and to protect Goguac lake. The project will compliment similar projects conducted on Goguac Lake to improve storm water quality. To date, six outfalls have been removed through similar low impact development techniques, including the lake's largest outfall. The City invested over $750,000 and has received nearly $1,400,000 in grant monies from the Michigan Department of Environmental Quality for these projects. 4/1/2009

City of Battle Creek

City of Battle Creek

Bus Purchase

One ( 1 ) 30 foot hybrid Transit bus to be used in daily fixed route bus service

Flood Control Channel Improvements

The City of Battle Creek core downtown business district has a flood control channel over the Kalamazoo river that runs through the center. This flood control project was built in the 1950's by the Army Corps of Engineers due to a history of severe flooding for the downtown and surrounding neighborhoods. This project is comprised of a combination of levees, concrete trapazoidal channel and improved natural river areas. The project has provided over 50 years of successful flood protection for the downtown. However the project is now in need of major maintenance work items due to normal wear and the fact that it is over the original 50 year life cycle. This project will provide the required levee improvements, channel crack sealing and river debris removal to extend the life for several more years. Further the Army Corps of Engineers inspected the channel in fall of 2008 and is requiring these improvements in order to keep this project under the Corps jurisdiction. Failure to comply will transfer the sole liability to the City of Battle Creek. The project construction cost is estimated 4/1/2009

New Parallel Runway and Taxiway Construction - Phase 1

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

i m

ub

City of Battle Creek

e t tt

New Airport Electrical Vault

D VE $

225,000

7/1/2010

$

550,000

10/15/2009

$

625,000

Construct the first phase of the new parallel runway and taxiway at Kellogg Airport. Many of the prerequisite elements related to the runway and taxiway construction hav been completed such as the acquisition of the Kellogg Hanger and the construction of the Administration, Operations, Maintenance Facility (AOMF). 7/1/2009

5/1/2010

$

W K Kellogg 3,500,000 Airport

There are 125 acres of land on the west side of the Airport to be developed. This area has been cleared of trees, however, the land is rolling and not currently suitable for development. With the completion of the new parallel runway, the Kellogg Airport will have additional capacity to safely add airport traffic. Utilities can be easily extended to serve this area. The City's experience with having development sites shovel ready has proven beneficial in the past. 7/1/2009

6/1/2010

$

W K Kellogg 1,500,000 Airport

The current airport electrical vault is located at the north end of the airport. With the extension of the primary runway several years ago and the proposed construction of a parallel runway to the primary runway, the electrical infrastructure needed to serve the Airports infrastructure needs to be centralized and updated. 10/1/2009

7/1/2010

$

W K Kellogg 600,000 Airport

s

t s e

PP

5/1/2009

O N

u q e

R d

Mass Earth Grading Project - West Side of Kellogg Airport

O R

Funding Request

Route (Infrastructure Only)

10/15/2009

A T

City of Battle Creek

Expected Completion Date

S 02262009

Submitted Requests - Not Approved

1132 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

Project Name

Project Description

Start Date

Expected Completion Date

Downtown Parking Facility Improvements

Rehabilitate the Mechanical, Structural, Electrical and Elevator systems in the Hamblin Avenue Parking Structure and reconstruct the Jackson Street Parking lot. The two parking facilities under consideration are adjacent to the Kellogg Company World Headquarters. The Kellogg Company recently announced their plans to coordinate with a development company to construct a six story office building on a site adjacent to the Hamblin Avenue Parking structure owned by the City of Battle Creek. The Kellogg Company will be in need of parking spaces in the structure for their employees working in the new building. The Jackson Street parking lot reconstruction will also benefit the Kellogg Company and other downtown businesses due to its prime location in the downtown. It is considered a “green project” since the design includes bio-retention facilities to treat storm water runoff thus improving water quality of the Kalamazoo River which is a major tributary to Lake Michigan. The Kellogg Company’s continued investment in Battle Creek as well as the State of Michigan has positive economic impact not only on Battle Creek but the entire Southwest Michigan area. 6/1/2009

Water Plant Rehabilitation

Update Water Production and Treatment Facility. The facility was constructed in 1981 The building and HVAC system need to be upgraded due to deterioration and use; and to improve energy efficiency. 5/1/2009

Sewer Pump Station Construction

PP

O R

Funding Request

D VE Downtown Battle 2,200,000 Creek

12/1/2009

$

6/30/2010

$

800,000

Construct sewage pump stations and a force main sewer. Several pump stations within the sewage collection system have exceeded their design life and have issues with their ability to continue to provide service. Seven stations need to be completely replaced as soon as possible to lower the potential for sanitary sewage overflows. A force main sewer needs to be constructed between two major pump stations to allow them to operate interchangeably to accommodate an emergency. 5/1/2009

6/30/2010

$

3,150,000

Construct structural liners inside of existing interceptor sewer and replace interceptor sewer siphon pipe. The main interceptor sewer for the sewer system has exceeded its design life and is corroded and in poor condition in several areas. The sewer needs to be lined with a product that will add structural support for the sewer and will improve its integrity. The interceptor also crosses the Kalamazoo River through two siphon pipes. One of the siphons has been put out of service because of excessive infiltration and the other is in extremely poor condition. They both have to be replaced with new pipes. This project is critical to the sewage collection system because failure of the remaining siphon would cause a significant sewer overflow into the River. 5/1/2009

12/31/2009

$

12,500,000

Improve the secondary treatment and solids handling processes at the Wastewater Treatment Plant. The blowers and pumps in the secondary treatment system use a large amount of electricity. Modifying the drives and impellors would reduce energy use. Alum is used to reduce phosphorus levels in wastewater. By enclosing the outdoor tanks that store alum, the material would be available year round and help to reduce the potential for clean water violations. Scrubber water has to be pumped back into the primary process for treatment. Installing variable frequency drives for scrubber water drainage would reduce the amount of energy used by the pumps involved in this process. Diffusers distribute air to stimulate the biological degradation of wastewater. Replacing deteriorated diffusers would improve performance and save energy. Centrifuges are currently used to dewater solids. Adding two rotary screen thickeners and presses would use less energy than centrifuges. Incinerators are used to burn solids in the winter. Replacing heat recovery equipment on the two incinerators would reduce energy use by transferring energy back to the incinerators and into the P5/1/2009

12/31/2010

$

6,500,000

A T

s

t s e

Route (Infrastructure Only)

O N

u q e

City of Battle Creek

City of Battle Creek

Interceptor Sewer Rehabilitation

e t tt

i m

b u S City of Battle Creek

City of Battle Creek

02262009

R d

Wastewater Plant Improvements

Submitted Requests - Not Approved

1133 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

Midland County

Midland County

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

City of Battle Creek

Project Name

$

2,500,000

Wastewater Plant Wind Turbine

12/31/2013

$

5,000,000

Community Park Improvements- Hamilton Park

Rebuild this neighborhood park thereby increasing property values and making this transitioning neighborhood a more desirable area to live. The project involves a complete replacement of playground equipment, new walking paths/ sidewalks, new landscaping, building a shelter, and construction of multi-use activity fields/ areas for physical activity. 6/1/2009

11/1/2009

$

200,000

Community Park Improvements- Fell Park

A complete replacement/ rebuild of park roads, parking, tree replacement/ landscaping, new shelter, and refurbishing of multi-use activity area to allow for more physical activity. 6/1/2009

12/1/2009

$

500,000

Community Park Improvements- Woodland Park

Complete 3.5 miles of walking paths, physical play areas, shelter, public restroom, and bridge construction to open up back area of park for use. This project would substantial increase opportunities for physical activity in an under served neighborhood as well as opportunities for participation in year around and/ or winter physical activities for the whole community.

8/1/2010

$

850,000

Geothermal Heating/Cooling System - County has completed schematic design of a new County Infirmary to house 60 disadvantaged and infirm clients, primarily developmentally disabled or aged and incapable of independent living. Geothermal system cost estimate is $650,000, which is over the total project budget of $6.5 million. County is interviewing geothermal specialists as the design development process begins in hopes of finding funds to pay for the additional cost, and intends to send out the mechanical bid package in March/April with geothermal design specifications as an alternate. Spring 2009

December, 2009

$

6,500,000

Courthouse Lead-Abatement and Exterior Renovation

The Midland County Courthouse is on the National list of Historic Properties (confirm). To maintain its' historic value, the wood trim needs to be redone. We tested this material and it contains lead paint. We need to abate the lead, then prime and repaint all the exterior trim. This includes scaffolding, paint containment, and a minimal amount of wood replacement. Tuckpoint and Masonry repairs also needed. Spring 2009

Late Fall, 2009

$

800,000

Courthouse Expansion and Interior Renovation

The historic Midland County Courthouse, built in 1924, is inadequate for the needs of the courts. New Courtrooms are needed, additional office and conferencing space as well as enhanced security features. Architect Ken Jandura of the architectural firm of Spillas Candela has completed a space needs study and a feasibility study in the past few years, and is ready to design the project. The only issue is funding for the project which is estimated at $30 million. Summer 2009

Summer 2011

$

30,000,000

t i m

ub

02262009

4,500,000

Install two 2 MW wind turbines at the Wastewater Plant. Sewage treatment for the community uses a significant amount of electricity on a continuous basis. Two wind turbines could provide the average daily electricity needs for the City Wastewater Plant. Excess electricity could be put out on the electric grid for other use. When additional electricity would be necessary it would come into the Plant from that grid.

T O

s t s

1/1/2010

-N

e u

q e R

P P A

Submitted Requests - Not Approved

O R

8/1/2009

12/31/2013

Route (Infrastructure Only)

D VE $

Water Plant Wind Turbine

d e tt

City of Midland, Midland County, Michigan

7/31/2009

Funding Request

Install a 2 MW wind turbine at the Water Plant. The production and treatment of water for the community uses a significant amount of electricity on a continuous basis. A wind turbine could provide the average daily electricity needs for the City Water Plant. Excess electricity could be put out on the electric grid for other use. When additional electricity would be necessary it would come into the Plant from that grid. 1/1/2010

S Midland County

Start Date

Construct 12" water main and 8" sewer. Upgrade two sewer pump stations. Extend water and sewer utilities to three sites in the vicinity of the intersection of Interstate 94 and the I-94 West Business Loop. These sites have prospective alternative energy I-94 West Business Loop/I-94 Utility Extension companies interested in developing there. 4/15/2009

Homer Township, Midland County, Michigan Pinecrest Geothermal

City of Midland, Midland County, Michigan

Project Description

Expected Completion Date

1134 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Midland County Midland County

Midland County

City of Birmingham

City of Birmingham

County of Midland, Michigan City of Midland, Midland County, Michigan

Project Name

Project Description

The current radio system for emergency responders has had only minor modifications since the early 1970's. There are many "dead spots" and incomplete coverage for voice, data and pagers. The County has completed a needs study, which indicated that a new, engineered system would cost over $10 million. A committee of responders is currently meeting to determine the scope of improvements that will be sought. At the least, substantial funds will be required to replace existing equipment as a result of narrow banding. Interoperability and improvement of coverage would enhance Public safety/Homeland security. Spring 2009 Convert the 70,000 sq. ft. County Building from a Chiller/Boiler system to geothermal with heat pumps. Spring 2009

Countywide Radio System County Building Geothermal

Homer Township, Midland County, Michigan Pinecrest Infirmary -Replacement Facility Birmingham, MI and Troy, MI Birmingham-Troy Transit Center

Construction of a multi-modal transit center on the border of two communities. Transit Center will provide rail, bus, airport and taxi connections and is tied into the planned regional mass transit initiative. FY 2008-2009

Birmingham, MI

Reconstruction of existing golf course clubhouse and winter sports activites center to meet community needs and increase energy efficiency through new technologies and LEED standards. FY 2008-2009

Lincoln Hills Clubhouse Reconstruction

Birmingham, MI

Shain Park Redevelopment

City of Birmingham

Birmingham, MI

Rouge River Trail

City of Birmingham

Birmingham, MI

Rouge River Erosion Control

City of Birmingham

Birmingham, MI

Woodward Ave. Streetscape Improvements

City of Birmingham City of Birmingham

Birmingham, MI Birmingham, MI

Joint Recreation Center Pierce St. Parking Structure

City of Birmingham

Birmingham, MI

City of Birmingham

Birmingham, MI

City of Birmingham

Birmingham, MI

Birmingham, MI

02262009

N s

st

e u

e t tt

Summer 2010

$

10,000,000

Fall 2009

$

2,250,000

December, 2009

$

7,200,000

FY 2009-2010

$

7,000,000

FY 2008-2009

$

850,000

FY 2009-2010

$

4,500,000

$

2,000,000

June, 2009

$

300,000

Completion of median and streetscape enhancements to improve the walkability and visual appeal of the Woodward Ave. corridor for businesses and visitors. FY 2009-2010

FY 2009-2010

$

2,500,000

Public portion of a joint effort to redevelop a community park and adjacent YMCA facility to provide increased community access to fitness and recreation opportunities. FY 2009-2010 Elevator (2) mechanical and aesthetic upgrades FY 2009-2010

FY 2010-2011 FY2009-2010

$ $

1,000,000 800,000

FY2014-2015

$

26,000,000

FY 2009-2010

$

600,000

FY 2009-2010

$

600,000

$

2,000,000

eq

Baldwin Ave. Bridge Replacement Pierce St. / Townsend St. Sewer & Water Improvements

Sewer and Water infrastructure improvements for neighborhood of approximately 900 single-family homes to increase system reliability and reduce the number of backups and main breaks. FY2009-2010 Replacement of bridge over Rouge River and adjacent street to improve access to neighborhood for residents and emergency vehicles. FY 2008-2009 Replacement of sewer and water infrastructure to improve service to hotel and retail properties and address the frequent water main breaks. FY 2008-2009

Chester Fire Station

Reconstruction of existing Fire Station to better serve western portion of community and potentially allow for expanded operation should consolidation of fire servies with neighboring community take place in the future.

Quarton Lake Sewer and Water

D VE

Reconstruction and expansion of civic center park and related street and surface parking improvements to enhance the surrounding area to help attract additional retail traffic for local merchants. FY 2008-2009 Completion of a renovation of partially existing trail network to improve community access and increase exercise opportunities for residents. Completion of erosion control, floodway expansion, and sediment trench to improve water quality and natural habitat along Rouge River. May, 2009

R d

i m

ub

S

T O

O R

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

The county has hired a construction management firm and an architectural firm with plans to construct a replacement facility for the Midland County Pinecrest Infirmary, which houses 60 disadvantaged and infirm clients, who are primarily developmentally disabled or aged, and who are incapable of independent living. The county intended to pay for the project out of increased millage funds. The architect has completed the schematic designs and is currently preparing the design development documents. The total project cost estimate is $7.2 million, including geothermal heating/cooling. The geothermal portion will be a bid alternate when the mechanical bid package is sent out in late March/early April. Spring 2009

City of Birmingham

City of Birmingham

Start Date

Expected Completion Date

1135 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Birmingham

Birmingham, MI

Sewer & Water Projects

City of Birmingham

Birmingham, MI

Parking Areas at Parks

City of Birmingham City of Birmingham

Birmingham, MI Birmingham, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI Leoni Twp, Jackson County, MI

Sidewalk Replacement HVAC System - Baldwin Library

Sewer and Water infrasturcture improvements in several areas of the City in order to improve services to residents and businesses and reduce the number of water main breaks. FY 2008-2009 Improvements to parking areas at Kenning Park and Lincoln Well to improve resident access to recreation facilities. FY 2009-2010 Replacement of less-than-adequate sidewalks to increase pedestrian safety in downtown area and neighborhoods. FY 2008-2009 Replacement of HVAC system at Library

Mun Water Reliability Improvement

Add three back up generators

6/1/2009

#2, 3 & 4 Sewage Lift Station Retro-fit Paint Water Tower & MIOSHA safety upgrades

Replace 6 existing pumps and upgrade all electrical

5/1/2009

Re-paint wet and dry areas of tower and conform to safety standards

6/1/2009

#5, 6 & 7 Sewage Lift Station Retro-fit

Replace 6 existing pumps and upgrade all electrical

Ranch Home Estates Storm Sewer Upgrade

Replace old storm sewer lines that are no longer working properly

Ranch Home Estates Water Upgrade

Replace old Water lines that are not efficient and are deteriorating

Harshbarger/Falahee Rd Mun Water Loop

Install mun water loop for reliability

E Michigan/ Fox Rd Mun Water loop

Install mun water loop for reliability

West State to North State Mun Water Loop

Install mun water loop for reliability

Seymour/Hawkins Rd. Mun Water Main

Install mun water loop for reliability

Lift Staion generators Non-motorized Trails and Safe Routs to school

Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township Leoni Township

02262009

FY 2008-2009

Funding Request

$

D VE $

150,000

FY 2009-2010

$ $

300,000 250,000

$

475,000

PP

9/1/2009

$

750,000

12/1/2009

$

250,000

5/1/2009

9/1/2009

$

750,000

6/1/2009

4/1/2010

6/1/2009

2/1/2010

8/1/2009

4/1/2010

$

250,000

8/1/2009

5/1/2010

$

3,000,000

8/1/2009

12/1/2009

$

250,000

8/1/2009

12/1/2009

$

1,000,000

Install 4 backup generator systems for sewer lift stations

8/1/2009

1/1/2010

$

240,000

Install up to 25 Miles of new walk paths

6/1/2009

10/1/2009

$

1,750,000

To maintain Sewer system

8/1/2009

1/1/2010

$

900,000

6000 s.f. Addition

8/1/2009

12/1/2009

$

1,000,000

Add/Replace Mobile Data Computers & offsite backup

8/1/2009

4/1/2010

$

1,000,000

Add new luminaires

8/1/2009

6/1/2010

$

1,000,000

3 alternative fuel vehicles for twp business

5/1/2009

8/1/2009

$

1,000,000

Township Vehicles

Repace 3 old obsolete Police Vehicles and equipment

5/1/2009

8/1/2009

$

100,000

Fire Engines

5/1/2009

8/1/2009

$

1,000,000

Township Hall renovation and addition

Replace 2 obsolete engines Replace old furnaces with energy efficiant ones, old single pane windows and add 1000 sq ft addition for Administration

5/1/2009

6/1/2010

$

1,000,000

New Wastewater Treatment Plant

Build new waterwater Bio-Membrane Reactor System to service 13 municipalities

9/1/2008

5/1/2011

$

34,000,000

e t t

Wireless/Interconnect Expansion

it

Street Lighting

Township Vehicles

O N

R d

New Vac & Jetter Truck DPW Addition

st

e u

eq

s

A T

Submitted Requests - Not Approved

O R 10/1/2009

Route (Infrastructure Only)

1,057,000

FY2009-2010

m b u

S

Expected Completion Date

1136 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Eaton County

Eaton County

Project Name

Project Description

Start Date

Eaton County desires to provide county-wide broadband services throughout its communities. The project will be a fiber and wireless combination. To accomplish this initiative the County has partnered with the local Intermediate School District (ISD and will be working in coordination with a project the ISD will begin in April 2009 to connect five (5) local school districts to the ISD. The project will progress from that point in phases to; providing services to the Eaton County Complex, then to local public safety agencies and local units of government and then finally to county residents. Eaton County is largely a rural community and contains sixteen (16) townships, ten (10) cities and villages and a small portion of the west side of the City of Lansing. Many residents and business owners have few options for high speed internet service. When installed, this system will provide connectivity to residents which will provide options for home businesses, on-line education and learning and many more opportunities. Townships, cities and villages will be able to communicate more efficiently and reduce costs by partnering for the purchase of these services inst April, 2009

County Wide Broadband

A T

O N

York Township, (Washtenaw County)

water and Sewer mains extension to southern install water and sewer mains to planned Southern Utility District for commercial and utility district residential development 6/9/2009

City of Mt. Pleasant

City of Mt. Pleasant

Infrastructure Improvement/Green: Ranney Well Upgrade

City of Mt. Pleasant

City of Mt. Pleasant

Infrastructure Improvement/Green:

Replace the original (1964) electrical controls for the Ranney Collector Well, which is the main water source for the city, with new energy eficient controls. 3/23/2009 Replace the existing high pressure sodium and metal halide lights in the water treatment building with mercury-free LED lights. 3/23/2009

Infrastructure Improvement/Green: Electricity Generation Project Infrastructure Improvement/Green: WWTP Light Fixture Replacement

Electricity Generation Project. The wasted heat from the waste water treatment process would be utilized to generate electricity which would operate a 250 KW generator. This project would generate electricity and reduce overall carbon footprint. 7/20/2009 Replace existing lights with mercury-free LED lights and motion sensing equipment, reducing energy consumption and lowering carbon footprint. 3/23/2009

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

City of Mt. Pleasant

Village of Richland

Village of Richland

02262009

D VE $

5,000,000 along Carpenter road south from bemis road to Willow road then west to Platt Road then south to 21,000,000 Arkona road

$

5/15/2009

$

30,000

4/24/2009

$

15,000 Throughout city

12/18/2009

$

5/15/2009

$

9/18/2009

$

N 32nd Street/M-43 Sidewalk Project

The Village of Richland has strived to become a walkable community with respect for people of all abilities, with appropriate ramps, crossings of driveways, benches, shade, lighting and other basic amenities. The completion of this project would connect several neighborhoods with the sidewalk system that networks the community with business districts, the post office, schools, library, community hall and parks. Our effort to connect neighborhoods, business districts and livable places with walkable paths provide residents with safe choices and improved quality of life. This project would construct 1382 feet of sidewalk along the west side of N. 32nd Street/M-43 in the Village of Richland where high volumes of motorized traffic make it unsafe for pedestrians and bicyclists to cross or ride along the roadway. Residents along this section are primarily limited to motorized transportation. 5/1/2009

8/1/2009

$

40,000

DE Avenue Storm Water Mitigation Project

The neighborhood on DE Avenue in the Village of Richland needs three storm water drains, which are designed to contain the storm runoff in the area where it falls and then dissipate into the ground making it environmentally friendly and effectively preventing erosion and flooding of adjacent residential properties. June 1,2009

8/1/2009

$

15,000

e u

st

eq

s

Complete Island Park Drive South; replace water main; reconstruct tennis courts; install tennis and ball diamond fencing; replace park shelter; construct sports courtyard.

R d

Infrastructure Improvement/Green: Island Park Improvements

b u S

Village of Richland

April, 2011

Funding Request

Route (Infrastructure Only)

6/11/2009

e t tt

i m

Village of Richland

O R

PP

York Township

City of Mt. Pleasant

Expected Completion Date

Submitted Requests - Not Approved

5/11/2009

550,000 50,000 Throughout city

615,000 Island Park

1137 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Richland

Village of Richland

Village of Richland

Village of Richland

Village of Richland

Village of Richland

Village of Richland

Village of Richland

Project Name

Project Description

Start Date

Senior Citizen Community Service Employment

To provide meaningful jobs for low to moderate income senior citizens to perform community service projects by transplanting and maintaining decorative plantings throughout the community and to improve the environmentally friendly appearance for the community to promote quality of life. Employ these senior citizens to perform modest tasks during community events and interact with youth. 5/1/2009

Village of Richland

Municipal Vehicle Replacement Project

The Municipal Vehicle Replacement program will improve overall exhaust emissions, toxic emissions, and particulate matter by replacing aged vehicles with alternative fuel vehicles. Replacement of current aged vehicles will improve the quality of life by improving air quality and reducing the public health implications. The current municipa vehicles to be replaced are a 1996 Ford F-150 and a 1994 Mack snowplow/dump truck and a 2002 Ford Crown Victoria. These vehicles will be replaced with a Chevrolet Hybrid Tahoe, IHC or Mack FFV and a Ford-150 FFV. This would also significantly impact the municipal budget with increased fuel economy as well as reducing our dependence on fossil fuels. 5/1/2009

Village of Richland

Construction of a Winter Material Storage Building

This project is to construct a containment building for winter street salt materials used to maintain safe major and local roadways and parking areas. This will protect the environment from ground contamination through run off. 5/1/2009

Village of Richland

Expected Completion Date

D VE $

13,000

10/1/2009

$

170,000

7/1/2009

$

10,000

Village of Richland

The Village of Richland municipal buildings consist of an 80 year old one story office building and a 40 year old public works/police garage. Both buildings are grotesquely energy inefficient. This project will be for construction of building improvements with sustainable design features to reduce annual energy costs by installing energy Municipal Building Energy Reduction Project - efficient windows, weatherization with new insulation and improve indoor air quality Municipal Office Bldg and natural and energy efficient lighting. May 1, 2009

October 1,2009

$

32,500

Village of Richland

The Village of Richland municipal buildings consist of an 80 year old one story office building and a 40 year old public works/police garage. Both buildings are grotesquely energy inefficient. This project will be for construction of building improvements with Municipal Building Energy Reduction Project - sustainable design features to reduce annual energy costs by installing energy Dept of Public Works maintenance and efficient windows, weatherization with new insulation and improve indoor air quality storage garage and natural and energy efficient lighting. May 1, 2009

October 1,2009

$

78,000

Village of Richland

d e tt

t i m

Village of Richland

02262009

q e R

O R

P P A

N s

st

e u

This project is to develop and install an innovative lighting system in the downtown park. Currently the park lighting system is approximately 40 years old, extremely inefficient and in need of repair. The new fixtures and timed lighting control panels will reduce the carbon footprint and energy consumption by approximately 50 percent or more, while significantly increasing light levels in comparison to the high-intensity discharge lights that are used today.

Village / Township Park Energy Renovation

8/1/2009

$

19,000

Home Weatherization to help low-income families reduce their energy costs by weatherizing their homes.

There are 735 resident in the Village of Richland. A large percentage of those homes were built between 1900 and 1970. This project is estimating approximatly one third of the homes would need winterization and are occupied by low to moderate income families. The estimated cost per home to insulate and upgrade windows and doors, or install efficent heating and cooling systems to make them more efficent efficent is $3000. Our project would offer each home owner $2000 toward winterization of their home. 4/1/2009

2010

$

484,000

D Avenue Sanitary Sewer

This project would install 2342 linear feet of sanitary sewer that is needed to connect residential homes to the public sewer system. This high density residential area has on-site private sewage septic systems that are the most common source of groundwater contamination. 4/1/2009

11/1/2009

$

501,540

b u S

Village of Richland

T O

9/1/2010

Funding Request

Route (Infrastructure Only)

5/1/2009

Submitted Requests - Not Approved

1138 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Sandstone Township

Sandstone Charter Twp

Fire Station EmergencyGenerator

Sandstone Township

Sandstone Charter Twp

Parking Lot

Install Generator power for Fire and EMS support. Will allow facilty to be used during power outages and emergency shelter to express way during snow and ise storms. 4/1/2009 Resurface and expand Township Hall paved parking area and replace cement butments 5/1/2009

Sandstone Township

Sandstone Charter Twp

Fire Truck

Replace Fire truck for joint Township Fire Department

Sandstone Township

Sandstone Charter Twp

Hall Upgrade

Sandstone Township

Sandstone Charter Twp

Police Car

City of Milan

City of Milan

City of Milan

City of Milan

City of Milan

City of Milan

$

43,000

D VE $

52,000

9/1/2009

10/1/2009

$

425,000

Replace rain gutters and reside building and improve insulation

5/1/2009

6/15/2009

$

30,000

5/1/2009

June 30,2009

$

24,000

County Street Reconstruction (Phase 1)

Replace current police car with high milage Road removal & reconstruction, water and sewer infrastructure replacement, storm sewer rehab & sidewalk replacement.

8/31/2009

$

County Street Reconstruction (Phase 2)

Road removal & reconstruction, water and sewer infrastructure replacement, storm sewer rehab & sidewalk replacement. This project will connect two projects scheduled to be completed on 2009 7/1/2009

9/30/2009

$

North Street Reconstruction

Road removal & reconstruction, water and sewer infrastructure replacement, storm sewer rehab & sidewalk replacement. This project will connect two recent reconstruction projects.

7/1/2009

9/30/2009

$

10/1/2009 6/1/2009

3/31/2010 7/31/2009

$ $

9/1/2009

9/1/2010

$

500,000

10/31/2009

$

Contained by Platt Rd. to the West, Main to the North, and Argyle Cresent to the South and 387,500 East

Redevelopment of 30 acres of vacant land adjacent to Birch Run Expo Center into an 8-field softball complex. Land is currently owned by Birch Run Expo Center. Project includes the construction of eight standard-sized softball diamonds, central located multi-purpose building featuring changing rooms, restaurant and maintenance/storage areas. Sporting complex will give Birch Run Expo Center the ability to host regional and natinoal softball/baseball tournaments for youth and adults alike, enhancing our attendance and impact on local hotels, restaurants and retail business. 4/1/2009

7/1/2009

$

1,500,000

Installation of steel supporting structure, including in-ceiling electrical improvements, inside the existing 30,000SF South Arena of the Birch Run Expo Center, allowing for the hanging of professional sound and lighting equipment for use during various public and performing arts events, including but not limited to concerts, professional speakers and theater presentations. This new infrastructure will give us the ability to host additional events, which we are currently unable to hold, and will also require us to add staff in order to handle the marketing of the expanded use of the facility. 4/1/2009

7/1/2009

$

250,000

T O

City of Milan City of Milan

W. Main St. reconstruction Water Tower Rehabilitation

City of Milan

City of Milan

Implementation of Energy Efficiency Study

City of Milan

May 15,2009

Funding Request

Route (Infrastructure Only)

June 30,2009

City of Milan City of Milan

City of Milan

Expected Completion Date

West Main Subdivision Infrastructure Reconstruction

P P A

Road removal & reconstruction, water and sewer infrastructure replacement, storm sewer rehab & sidewalk replacement. This project will connect two recent reconstruction projects. Rehabilitation of an existing water tower. Impliment Energy Efficiency Study on all City facilities including City Hall, Senior Center, community House, DPW Building, and WWTP

N s

t s e

u q e

O R

Road removal & reconstruction, water and sewer infrastructure replacement, storm sewer rehab & sidewalk replacement.

7/1/2009

4/1/2009

Marvin St. to 650,000 Dexter Ave. Dexter Ave. to east 1,695,000 City Limits First St. To 775,000 Michigan Ave. Church St. to Platt 2,035,000 Rd. 250,000

R d

Birch Run Expo Center Birch Run

Birch Run Expo Center Birch Run

02262009

e t tt

i m

Creation of Outdoor Sports Complex

b u S

Renovation of Public Assembly Facility

Submitted Requests - Not Approved

1139 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Martin

Village of Martin

Project Name

Project Description

Start Date

The Village of Martin currently discharges its municipal wastewater through a 6 mile forcemain to the City of Plainwell. The ductile iron forcemain has deteriorated, exceeded its useful life and regularly breaks, plugs and overflows. The Village has evaluated several options to replace the existing forcemain to prevent these ongoing problems. These options include replacemet, discharge to other adjacent municipalities and construction of a new facility to treat the waste locally. The Village must pursue one of these options and implement it quickly to address the current problems that will only get worse over time. The Village is a small community with a limited number of customers and resources to complete this large undertaking. The availability of economic stimulus funding would allow the Village to properly plan and implement the best long term alternative in a manner that would not increase the rates to the point the customers could not pay them. 4/1/2010

Wastewater System Improvements Project

8/1/2009

$

12/1/2009

$

80,000

12/1/2009

$

30,000

12/1/2009

$

50,000

Reline and/or replace existing 8-inch water main along Allen Road from Superior to Leroy Street. This would include new gate valves and fire hydrants along with water services (only if the main is replaced). Driveway replacement and some sidewalk replacement would be required if the water main is replaced. 9/9/2009

3/10/2009

$

800,000 Allen Road

Reline and/or replace existing 12-inch water main along Eureka Road from Trenton Road to Fort Street. This would include new gate valves and fire hydrants along with water services (only if the main is replaced). Concrete sidewalk and drive replacement would be needed if the water main is to be replaced. 8/9/2009

4/10/2009

$

720,000 Eureka Road

Northline Road Water Main Improvements

Reline and/or replace existing 8-inch water main along Allen Road from Superior to Leroy Street. This would include new gate valves and fire hydrants along with water services (only if the main is replaced). Driveway replacement and some sidewalk replacement. 8/9/2009

12/9/2009

$

475,000 Northline Road

Old Homestead Subdivision Sanitary Sewer Rehabilitation Program

Reline existing sanitary sewer lines to reduce root intrusion and inflow and infiltration. As part of this program all sanitary sewer in the subdivision will be televised and cleaned. Sanitary manholes will be repaired to reduce inflow and infiltration by removing and replacing worn and damaged manhole frames and covers as well as sealing the exterior with a rubberized wrap. 9/9/2009

6/10/2009

$

Various Streets 900,000 Within Subdivision

A T

City of Southgate

City of Southgate

Police Station Building Improvements

City of Southgate

City of Southgate

Fire Station Building Improvements Department of Public Works Site Improvements

Removal and replacement of existing security fencing and entrance doors. Place new security fencing, entrance doors, and secured gate access along with security cameras. 9/1/2009

City of Southgate

City of Southgate

City of Southgate

City of Southgate

City of Southgate

City of Southgate

02262009

Allen Road Water Main Improvements

tt i m

d e t

s

st

e u

q e R

Eureka Road Water Main Improvements

b u S

City of Southgate

D VE $

Black Creek Ridge - Affordable Housing Infrastructure - Phase II

City of Southgate

Funding Request

Route (Infrastructure Only)

11/15/2010

Lohman Equities, LLC Zeeland

City of Southgate

O R

PP

Infrastructure installation to complete Phase II of Black Creek Ridge housing development located in Zeeland Township, MI. Construction needed to complete sitework, water and sewer, utility connections, common areas, identifying signage, and subdivision roadway, of this 60-lot housing development. Site has been engineered, and is approved by Zeeland Township, Lohman Equities is considering opening home sites for residents requiring affordable housing. Project will require adding staff for project/property management. 5/1/2009 Replacement of existing jail cells and security cameras, along with security doors and sewer leads. 9/1/2009 Removal and replacement of existing overhead doors, exterior entrance doors, and floor grates. 9/1/2009

City of Southgate

Expected Completion Date

O N

Submitted Requests - Not Approved

3,100,000 NA

500,000 HUD

1140 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Reline existing sanitary sewer lines to reduce root intrusion and inflow and infiltration. As part of this program all sanitary sewer in the subdivision will be televised and cleaned. Sanitary manholes will be repaired to reduce inflow and infiltration by removing and replacing worn and damaged manhole frames and covers as well as sealing the exterior with a rubberized wrap. 9/9/2009

8/10/2009

11/10/2009

City of Southgate

City of Southgate

Leemon & Rosenhaus Sub, Richmond Park Sub, Practical Sub. No. 2, Merrill Manor Sub, Gallant Sub, and Southgate Gardens Sub Sanitary Sewer Rehabilitation Program

City of Southgate

City of Southgate

Water Meter Improvement Program

Update existing water meter reading system to a fixed network system. This would include removing and replacing all meters with radio read meters and radio tower.

MEDC

Alpena Co

St Peter Test Wells

Alpena St Peter CCS test wells 1) evaluate the geologic feasibility of storage of CO2 in the region of the Wolverine Clean Energy Venture, Rogers City.

Wind Energy for Townships

Grants would be provided to 50 townships to purchase small wind turbines. Townships are responsible for siting and zoning decisions for wind turbines. The wind turbines would demonstrate the value of wind energy and give township officials experience with wind energy. [See MEDC-0016] 4/9/2009

Solar Energy for Schools

Grants would be provided to 25 schools for 10 kW photovoltaic systems. The schools would be required to incorporate solar energy into the classroom using existing solar energy curriculum. 120 days after

Weatherization

Michigan currently has a network of 32 agencies performing Weatherization work on low-income residential homes through the Federal Weatherization Assistance Program (WAP). Funding passes through DHS to the 32 agencies. The bill proposes $6B for Weatherization and it appears to be WAP funding that would pass through to 30 days after current local organizations performing weatherization. funding received

Industrial E2

Expand RETAP Technology Demonstration Grant Program to provide funding to facilitate adoption of innovative but commercially available energy efficient technologies not yet widely adopted by Michigan manufacturers and institutions. Projects will focus on achieving measurable reductions in energy usage, waste generation, improved process efficiency, and enhanced business profitability.

DELEG

DELEG

DHS

DELEG

DELEG

DELEG

DELEG

DELEG

Statewide

Statewide

Statewide

Statewide

T O

N s

R d

Conduct pollution prevention and energy efficiency audits at small michigan agricultural business. Funding would support 2 Michigan Agriculture Energy Assessment Centers that will conduct audits and provide audit training.

O R

P P A

st

e u

eq

11/9/2009

Funding Request

D VE

Route (Infrastructure Only)

$

Various Streets 1,500,000 Within Subdivision

$

120,000 Entire City System

12 months

$

6,000,000 O2

9/30/2009

$

1,000,000 R1

9/30/2010

$

2,250,000 R3

9/30/2010

W1

6/1/2009

5/15/2009

$

1,500,000 E1

State-wide

AgriTAP

Ongoing

6/30/2011

$

500,000 E1

Kalamazoo / Plainwell

Comprehensive energy audits for the two DeLEG owned facilities, the Michigan Commission for the Blind Training Center in Kalamazoo and the Michigan Career and Technical Institute in Plainwell. Implementation of energy conservation measures such as HVAC, lighting, DHW and building envelope upgrades. [See MDOT 591Energy Efficiency for DeLEG-Owned Facilities 003G; DMB-003-G-ee] 3/9/2009

9/30/2010

$

3,000,000 E1

Biofuels Infrastructure Grants

Grant incentive to facilitate more E-85/alternative fuel station conversions and new stations, to offer initial help and reduce economic barriers for stations that could later receive the tax credit that currently offsets a percentage of those costs; ideally would allow $50k per facility, yielding a maximum benefit for up to 40 new or converted stations. 4/9/2009

9/30/2009

$

1,000,000 R1

Renewable Energy Technical Assistance

Technical assistance would be provided to schools, townships, colleges, and local governments interested in renewable energy technologies. Technical assistance would help public agencies make the best use of grant monies available through other programs including Wind Energy for Townships, Solar Energy for Schools, Local Government Energy Efficiency Block Grants, k-12 School Modernization, and Higher Education Modernization. 4/9/2009

9/30/2010

$

180,000 R1

Statewide

Statewide

02262009

e t tt

i m

b u S

Submitted Requests - Not Approved

1141 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DELEG

DELEG

DELEG

Statewide

Kalamazoo

East Lansing/ Ingham County

DELEG

Taylor

DELEG

Several locations statewide

DELEG

Focused in 8 Michigan Cities with the highest poverty rates

Project Name

Project Description

Michigan Energy Demonstration Centers

Biomass Research and Development

This funding would allow Western Michigan University to work in collaboration with Michigan Biodiesel LLC. in developing value added products from their by-product streams. In particular, research will be completed to lower ash and water content from waste glycerin enabling it to be utilized in the production of "green chemicals." The biodiesel industry is under tremendous pressure from the cost of feedstock and adding value to by-product streams will help to improve profit margins.

PP

Biomass Research and Development

Funding would allow the Michigan State University Engineering Department to set up facility to provide valuable data on the combustion of biogas. Most combustion engines are currently unable to burn biogas (without a conversion) since it has a variable composition. This would be especially beneficial for farms with anaerobic digesters and other operations looking to offset natural gas costs. 3/9/2009

4/1/2010

$

52,000 R2

Wood Fueled Central Boiler

This funding would allow the city of Taylor to install a woody biomass boiler at their existing Heritage Park Petting Farm complex. The facility will serve as a public demonstration for this technology and its ability to reduce energy costs. [EECBG]

180 days from funding

4/1/2010

$

178,000 R2

Energy Code Training

Comprehensive training available for recently established Michigan Uniform Residential Energy Code. Target audiences include code enforcement officials, architects and designers, builders, contractors, building related NGO's etc.

180 days from funding

12/31/2009

$

50,000 T1

Michigan Energy Conservation Corp

Create a Michigan Energy Conservation Corps (MECC) to make Michigan schools, public buildings and low-income private homes more energy efficient and, along the way, save massive amounts of energy and train and employ thousands of unemployed

90 days from funding

$

3,900,000,000 T1

DEQ Cadillac District Office

e t t

t i m

ub

Transportation -Govt equipment

A T

e u

st

eq

s

O N

R d

Cadillac

Construct and manage an Energy Education Center that will develop, educate, train, demonstrate and implement innovative technologies for agriculture enterprises including energy efficiency, green energy generation, on-farm energy audits and new 180 days from bioproducts. funding

2 years

$

Building Renovations Energy Conservation: New HVAC System, Energy Monitoring System, Insulation, 10kW Solar Array, Tankless Water heater

6/1/2010

$

2yrs

$

50,000,000 O1

30 days after funding received

Reduce emissions from state/local operations by funding retrofits of emission equipment and engine replacement on governmental diesel equipment (on and offroad). This would include any diesel engine equipment used to provide governmental 30 days after services (whether owned, leased or operated). funding received

DEQ

State wide

DEQ

State wide

Transportation -School Emissions

Provide incentives for municipalities to replace older existing buses with more fuel efficient systems with lower emissions. This would include hybrids and alternative fuels and result in supporting urban mass transit systems. Fund the installation of filters to reduce particulate emissions from school buses that may impact children asthma and other health issues.

DEQ

Bay City

DEQ Saginaw Bay District Office

Building Renovations to LEED certified building: 10kW Solar Array

Transportation -Mass Transit

4/1/2009

960,000 R1-E1

75,500 R2

DEQ

02262009

O R

D VE $

$

Center for Farm Energy & Applications

S

9/30/2009

Funding Request

Route (Infrastructure Only)

4/1/2010

East Lansing, Michigan

State wide

Start Date

Maintain and expand the Michigan Energy Demonstration Center network which provides demonstrations of renewable energy technologies and information to Michigan residents. Funding would provide financial support to the existing 8 centers and 8 new centers. Solar electric, solar hot water, and wind energy demonstrations would be funded at 8 existing environmental education centers who would become new members of the network. 3/9/2009

DELEG

DEQ

Expected Completion Date

Submitted Requests - Not Approved

10,000 T2-R2

255,000 RE1

30 days after funding received 60 days after funding

2yrs

$

10,000,000 O2

2yrs

$

10,000,000 O1

180 days after funding received

6/1/2010

$

100,000 RE1

1142 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

DMB

Flint, Saginaw, Jackson, Escanba, Grand Rapids, Traverse City and Lansing area State owned buildings LED Technology

Install LED-based technology in all DMB owned facilities. Replace fluorescent bulbs with efficient LED bulbs to reduce energy consumption, extend the useful life and reduce maintenance.

6/1/2009

DMB

Flint, Saginaw, Jackson, Escanba, Grand Rapids, Traverse City and Lansing area State owned buildings Green Roofs

Install green roofs on all DMB managed and owned facilities. Green roofs insulate facilities, thereby reducing runtime for heating/cooling systems and they help filter carbon dioxide and other pollutants out of the air. [Low Priority - Fund 1 or 2 as Demonstration as Resource become available.]

5/1/2009

DMB

Secondary Complex Lansing (Eaton County)

Water Recovery

Install water recovery system at Police Training Academy drive track to recapture run off water and re-use. [Low Priority] 6/1/2009

Co-generation Energy System (project was noted on original list)

Install a renewable co-generation energy system that will use a renewable biogas (methane) fuel source to produce electricity and steam. This will provide all heating, cooling and electrical power requirements for 13 buildings at the Secondary Complex. Any excess electricity produced will be sold back to the local utility company. Project requires and includes enhancements to existing energy distribution system. [Funding not sufficient - Priority 1] 5/1/2009

T O

DMB

Secondary Complex Lansing (Eaton County)

DMB

Munising, Baraga, Marquette, Muskegon, Coldwater, Painsedale, Kinchloe, Manistee, Marenisco,Lapeer, Flint, Saginaw, Jackson, Escanba, Grand Rapids, Traverse City and Lansing area State owned buildings Wind Turbine Technology

DMB

Flint, Saginaw, Jackson, Escanba, Grand Rapids, Traverse City and Lansing area State owned Photovoltaic Solar System (project has been buildings modified since original list)

DMB

Flint, Saginaw, Jackson, Escanba, Grand Rapids, Traverse City and Lansing area State owned Energy Audits buildings on original list)

tt i m

S Varies

DNR

Marquette (Harvey) Shop Garage / Storage Buildings

02262009

-N

Funding Request

Route (Infrastructure Only)

D VE $

20,000,000 E1

1/1/2011

$

30,000,000 E3

4/1/2010

$

750,000 E3

4/1/2010

$

27,000,000 N/A

9/1/2010

$

20,000,000 R1

1/1/2011

$

21,000,000 R2

9/1/2010

$

30,000,000 R1

$

200,000 E1

$

10,000 E1

O R

e u

q e R

5/15/2009

Energy management Photovoltaic Solar System. This project will provide a grid-tied building integrated solar powered electric system, integrated with an energy management system that is web based and displayed on an interactive touch screen. [Priority 3] 6/9/2009

Implementation of conservation measures necessary to offset the escalating utility rates in State-Owned buildings. These measures will also include Energy Audits (project was noted required by PA 295 of 2008 and improvements to meet the next five years' requirements. [See abor MDOT 591-0003G. Priority 2]

All Visitor Centers-9 locations statewide, schedule inspections and implement suggested energy efficiency measures including insulation, window replacement, or light bulb changeover.

DNR

9/1/2010

P P A

Install wind turbines and related equipment to multiple State of Michigan owned facilities. Electrical power generated by the turbine will be primary, if additional electricity is required it will be supplemented by the local electrical supplier. This will allow large consumption facilities the ability to lower their demand loads from the electrical grid. [Join with DNR 0093-GR2]

d e t

ub

s t s

Expected Completion Date

6/9/2009

Energy efficiency improvement modifications. [Combine with DNR-0016-GE1]

6/9/2009

Marquette ICC-replace 2 radiant heaters in repair shop

6/9/2009

Submitted Requests - Not Approved

2 years from funding 1 year from funding

1143 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

DNR

Statewide

DNR

Statewide

DNR

Marquette, Baraga, Gaylord, Cadillac, Roscommon, Bay City, Plainwell

DNR

Statewide

DNR

Statewide

DNR

Project Name

Project Description

Start Date

Hatchery Greening 90 days

Construction contract to improve energy efficiency. This includes converting to liquid oxygen; transformer, generator and battery upgrades; tower and HVAC improvements; roof, siding, insulation and exterior block wall improvements; pump and incubation improvements; well and raceway improvements; lighting improvements; pumps and fuel tank improvements; replace windows and doors; and other energy saving improvements. [Priority 1] 6/9/2009

Hatchery Greening 180 days

Construction contract to improve biosecurity, reduce energy and water use, and to improve system reliability. This includes influent filtration, by-pass channel, and UV improvements; additional high efficiency production wells; pump and water line improvements; raceway modification and other energy saving improvements

Window Energy Star rated and carpet replacement at the Gillette Vistors Center

DNR

Statewide

Statewide State Park Vehicle Replacement with Alternative Fueled Vehicles

Statewide State Park Vehicle Replacement with Alternative Fueled Vehicles (25)

DNR

Statewide

DNR

Howell & Ionia

Equestian Campground Solar Water Systems Solar pump system replacements (7) of water wells at equestrian campground Geo-thermal HVAC Systems at State Park Headquarters Geo-thermal HVAC system replacement at state park headquarters (2)

MDOC

Newberry

Boiler replacement

MDOC

Munising, Baraga, Marquette, Muskegon, Coldwater, Painsedale, Kinchloe, Manistee, Marenisco,Lapeer

MDOC MDOC

38 Faclities Marquette, Coldwater, Ionia,Ypsilanti

MDOC

38 Facilities

MDOC

Ypsilanti

MDOC

Marquette, Coldwater, Ionia,Jackson, Muskegon,Ypsilanti

MDOC

38 Faclities

New Exterior Lighting

itt

T O

s t s

-N

e u

q e R

Replace abondoned boiler with new energy efficient boier with proper controls

Low grade stack heat recovery systems

m b u

Interior lighting up-grades

6/9/2009

6/9/2009 6/9/2009 6/9/2009

Install boiler economizers

MDOC

38 facilities

Up-grade Air Handling Units Retrofit and up-date heating, ventilation and air conditioning systems

MDOC

Munising, Baraga, Marquette, Manistee, Manistee, Saginaw

Electronic water control systems

2 years from funding

548 days from funding 150 days after funding received 180 days after funding received 150 days after funding received 150 days after funding received 330 days after funding received 150 days after funding received

5/1/2009

$

1,487,500 E1

$

3,190,000 E1

$

350,000 R1

$

230,000 E1

$

350,000 E1

$

138,000 E1

$

500,000 R1

$

281,750 R1

$

46,000 R1

$

876,000

1

$

60,000,000

2

$

12,000,000

3

Install low grade heat recovery systems to save on natural gas consumption.

$

400,000

4

Replace all magnetic ballasts with T12 lamps to T8 lamps with electronic ballasts

$

8,000,000

4

Install wind turbines and all necessary equipment to supply power for prison demands This will allow large consumption facilities the ability to remove their demand loads 180 days from from the grid. [dmb-0005-G; MEDC-00016] award 180 days from Replace all exterior lighting for all state facilities with new LED lighting. award

Steam Boiler and facility energy management Replace abondoned boiler with new energy efficient boier with proper controls. Install Immediate upon control system a facility energy management system to save on energy consumption. funding

S

02262009

O R

P P A

Muskegon

d e t

6/9/2009

Funding Request

Route (Infrastructure Only)

D VE

2 years from funding

Purchase and installation of two energy efficient wind turbines per location. [See DMB005-GR] 6/9/2009 Energy efficiency improvements at (7) statewide Visitor Centers [See MDOT 591001G; MEDC-0029] 6/9/2009 Statewide State Park Building Energy Efficiency Renovations [MDOT 591-0039; DMB B-0003-G-EE] 6/9/2009

Wind Turbine Installation Statewide Visitor Center Energy Efficiency Renovations Statewide State Park Building Energy Efficiency Renovations Hoffmaster State Park - Energy Efficiency Upgrades

Wind turbine generators

Expected Completion Date

11/9/2009

$

4,500,000

5

Several of our power plant boilers do not have economizers installed. Several other plants have economizers installed that have completely failed or have reached the end of their life expectancy. Remove all pneumatic controls and install electronic controls. Remove dampers and install variable speed motors were needed.

$

11,000,000

6

$

35,000,000

7

Up-grade HVAC systems to enerngy efficient systems

$

20,000,000

8

Install water and sewer electronic contol systems for all wet cell applications to help save on water and sewer consumption.

$

8,200,000

9

Submitted Requests - Not Approved

1144 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Start Date

Funding Request

Ypsilanti

MDOC

Ypsilanti, Marquette, Jackson, Ionia, Newberry, Co-Generation

MDOC

Kincheloe, Jackson,Detroit, St. Louis, Freeland, Adrian, Ypsilanti, Munising, Baraga, Ionia, Muskegon, Roof replacement with additional insulation Coldwater, Marquette installation

MDOC

Jackson

Window replacement

Removeexisting roofing. Install new roof insulation to meet R-30. Install new roofing Remove the existing single pane glass and install energy efficient insulated glass units.

MDOC

38 facilities

Boiler Replacement

Remove and install hydronic inefficient boilers with new high efficient boilers

Energy Audits - Priority #R1

Implementation of energy conservation measures necessary to offset the escalating utility rates in 161 MDOT -Owned buildings. These measures will also include Energy Audits required by PA 295 of 2008 to meet the next five years' requirements. [DMB0003-G-EE]

9/1/2010

$

333,300 R1

Weatherization - Priority #R2

The best way to improve energy efficiency in the 161 MDOT owned facilities is to make sure they are sealed against the outside weather. Replace failed seals on doors and windows.

9/10/2010

$

866,500 R2

Pilot Project for Alternative Energy at Interchanges- Priority #R3

Pilot project to determine and install the most feasible alternate energy technology to provide electrical power for up to 4 highway interchanges (e.g. lights, etc.) in the Grand Rapids metro area, in cooperation with The Right Place Inc. This would involve various possible energy sources, including but not limited to solar, wind, bio-mass and/or battery.

9/1/2010

$

500,000 R3

Install the most reasible alternte energy technology (e.g. solar panels and wind turbines) to provide sustainable energy at locations statewide. This would involve various possible energy sources, including but not limited to solar, wind, bio-mass and/or battery. The goals are to use alternative sources of energy to power rest areas and for welcome centers to become showcases for green energy technology. [Potentially focus on I-75 cooridor as an intial phase.]

1/1/2011

$

4,000,000 R5

Funding for infrastructure for a commercial scale manufacturing facility for cellulosic ethanol with Mascoma Corporation. Funding to be provided through multiple sources: $13 Million through the EPA's Clean Water State Revolving Fund for wastewater treatment to be owned by the local municipality or through the USDA Rural Water and Waste Disposal Program; $7 Million through the Dept. of Housing and Urban Development Community Development Block Grant Program for power and natural gas infrastructure.

18 - 24 months from award

$

20,000,000 R1

MDOT

MDOT

MDOT

Statewide

Statewide

Grand Rapids

Statewide

Install bi-mass boilers with steam turbines to supplement electrical needs generated from the bio-mass bopilers.

A T

Kinross

02262009

t i m

Centers of Energy Excellence - Cellulosic Ethanol Commercial-Scale Facility

b u S

s

t s e

O N

u q e

R d

Green Rest Areas and Welcome Centers Priority #R5

e t t

MEDC

$

Route (Infrastructure Only)

MDOC

MDOT

Phase 3 Steam & condensate piping

Project Description Install a pipe chase with proper steam and condensate lines with insulation to save on natural gas consumption.

Expected Completion Date

Submitted Requests - Not Approved

O R

2,000,000

D VE

PP

10

$

90,000,000

11

$

27,400,000

12

$

2,300,000

13

$

5,000,000

14

1145 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description The state of Michigan operates 14 Welcome Centers along major state highways to provide travelers with an oasis for safety, refreshment, and tourism information. It is proposed that under the Welcome Center Greening Project a full energy audit would be performed on each state-owned Welcome Center, local companies/contractors would be hired to perform basic energy conservation activities (i.e., air infiltration work, new energy efficient windows, add insulation, etc.), a pilot effort would be undertaken with a wind turbine manufacturer(s) to identify and develop a wind power generated electrical system at one to four of the Welcome Centers. Potentially, such a pilot effort would involve wind turbines of various electrical output capacities, and include one or more innovative wind turbine systems (e.g., gearless systems). Under such a concept, it may be possible to pilot a system that could actually generate more electricity than the Welcome Center needs for its own usage and, thereby, be in a position to sell the excess capacity back to the local utility grid.

Start Date

MEDC

statewide

Welcome Center Greening

Statewide

We would propose a program to retrain 1,000 automotive engineers for new careers in alternative energy. We need to retain this talent to ensure adequate talent is present in the state to meet our long term goals of diversifying into this industry. This Retraining/Training of Engineers for advanced program would pay for training, and also a stipend to enable these workers to stay in energy programs their homes while they learn new skills.

Statewide

Natural Resources Initiative – Our State’s Natural Resources are abundant and contribute significantly to our State’s economy. Investments in conservation and sustainable management of our natural resources will help us realize untapped potential that will allow us to grow our green economy. Our natural resources green economy opportunities include maintaining jobs in our current forest and agriculture based sectors, building on our excellent recreational infrastructure, developing our emerging renewable energy sector, and development of other ecosystem services like those in the areas of water and carbon sequestration. A greening corps program that includes both natural resource professionals and trained laborers would protect Natural Resources Initiative - Incoporated as our State’s natural and cultural resources, promote sustainable management on public part of a broader multi-agency proposal titled and private lands and lead to a sustainable and available supply of biomass to suppor renewable energy and fuel initiatives. [Merge with MEC] Michigan Green Corps

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

P P A

The project will also explore the utilization of other alternative energy options (i.e., sola MEDC

Expected Completion Date

$

3,000,000 R1

$

50,000,000 T1

2 years from funding

$

231,245,765 T1

6/1/2010

$

N s

t s e

MEDC

u q e

R d

e t tt

i m

Focus Hope

b u S

Detroit, Michigan

02262009

Focus: HOPE Neighborhood Improvement Initiative

The community surrounding the Focus: HOPE campus suffers from high levels of crime, a large "digital divide," a lack of commercial investment, and other concerns of low-income urban neighborhoods. Critical interventions are needed in the areas of crime and safety, neighborhood access to technology, and energy efficiency, safety, and façade improvements for homes in the target community development area. This project will involve deploying internet technology to all homes in the target area, and deployment of a new camera surveillance system which will allow businesses and homes to have real time access to security cameras to view crime “hot spots.” The project also involves providing energy efficiency, safety and façade improvements to targeted blocks in connection with a block club leadership development program, and includes the demolition of 38 abandoned homes. 11/1/2009

Submitted Requests - Not Approved

2,900,000

1146 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Detroit and Highland Park, Highland Park - Detroit Cooperative Housing Michigan Development

Focus Hope

Start Date

The extraordinary tsunami of home foreclosures in Detroit has created an huge pool o families whose only option is to rent. This planned cooperative housing development will provide a new alternative for these families in the form of quality, affordable housing with energy-efficient construction. The cooperative ownership structure means that a family is not required to obtain a mortgage for each individual dwelling; instead they pay a monthly usage fee, and participate in the growing equity in the overall development. The site of the development is an extremely impoverished neighborhood which was devastated by a 1997 tornado and has not rebuilt. This project involves the installation of geothermal heating and cooling system and related infrastructure for new cooperative housing development straddling Highland Park and Detroit. The geothermal system will allow the housing units to be fully affordable, due to radically reduced energy costs for each unit. 8/1/2009

Highland Park, Michigan

St. Clair County

Roseville

Roseville

Roseville

Port Huron, MI

Roseville/Eastpointe

Roseville

Roseville

D VE $

2,000,000

Much of the City of Detroit is often termed a "food desert" and even where clean grocery stores are found, the availability of fresh produce and healthy foods is limited and prices frequently exceed the norm. This project aims to combine the great need for affordable, fresh and healthy food, with an entrepreneurship center designed to provide incubator space for urban entrepreneurs, particularly those who play a role in the food cycle - from small catering businesses which employ returning citizens to small scale bakeries. The project involves the acquisition of a 400,000 square foot abandoned bakery building, right-sizing the building, and redeveloping 125,000 square feet to become a new community food resource, including a grocery/market with an emphasis on fresh food, a green roof producing edible vegetables, a multi-tenanted trade center for urban social entrepreneurs. This project will convert a blighted Brownfield site into a vibrant food source and will also provide a demonstration of how urban farming can occur at roof level. 11/1/2009

11/1/2011

$

12,200,000

Abatement and Demolition of old YMCA Building

The old YMCA is not suitable for renovation as there is asbestos, lead, etc. which would have to be abated prior to any renovation projects. The County has conducted an environmental assessment of the building which estimates that abatement would cost $350,000 and demolition/site improvements would cost $650,000. The other environmental issue is that this building is located less than 200 feet from the St. Clair Early Summer River which feeds into the Great Lakes. 2009

6 months from start date

$

1,000,000

Water System Reservoir

Construct a bi-City(Roseville and Eastpointe) water system reservoir to reduce energy required to operate entire regional (DWSD) system as well as increase system reliability and available fire flows. 7/1/2009

7/1/2010

$

2,500,000 10 Mile and Gratiot

Utica Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

11/1/2009

$

Utica Road- Castle 1,500,000 to Gratiot

Martin Road Water Main Replacement

Replace an aged cast iron water main with a new ductile iron, HDPE or PVC water main. The project will increase system reliability as well as eliminate an old main which breaks within the roadway several times a year.

8/1/2009

$

Martin RoadBrinker to East City 550,000 Limit

12/1/2010

$

10/1/2009

$

Center for Urban Entrepreneurship & Agriculture

e t tt

i m

b u S

s

t s e

O N

u q e

R d

Roseville

Roseville

Sewer Lining and Replacement

Roseville

Roseville

Kathy Road Reconstruction (CDBG)

02262009

PP

O R

Funding Request

Route (Infrastructure Only)

6/1/2011

A T

Focus Hope

Expected Completion Date

6/1/2009

4/15/2009

Line or replace structurally deficient sewers throughout the City in order to alleviate sewer failures which may cause sewer backups, sanitary sewer overflows and costly, disruptive restoration. 6/1/2009 Remove and replace a severely deteriorated roadway which is located in a Community Development Block Grant Area. 5/1/2009

Submitted Requests - Not Approved

15,000,000 City Wide Kathy St- Frazho to 640,000 11 Mile

1147 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Roseville

Roseville

Roseville

Roseville

Remove and replace a severely deteriorated roadway which is located in a Groveland Road Reconstruction (CDBG) Community Development Block Grant Area. 6/1/2009 Parks and Recreation Building Rehabilitation Rehabilitate the existing building with many needed structural renovations in order to (CDBG) maintain the building's serviceability 7/1/2009

Yates Township, Lake County

Restore the historic Flamingo Club, including a new roof, heating sytem, windows, entry/exit doors; exterior deck and nature walk-way, landscaping and greenway improvements and public parking; and restore interior plumbing, electrical, walls, Idlewild, Michigan Transformation Initiative -- commercial kitchen, and public restrooms. Would be an entertainment center to Flamingo bolster regional tourism, drawing upon the history of the building and community.

HAL

Yates Township, Lake County Yates Township, Lake County Yates Township, Lake County

Restore the historic Casablanca Hotel as a contemporary art center; install gallery space, classrooms, restaurant facility, public restrooms, and artist live/work spaces. Idlewild, Michigan Transformation Initiative - Owner would deed to a governmental or non-profit organization and the restored Casablanca facility would be operated by a non-profit cultural organization. Idlewild, Michigan Transformation Initiative -- Wireless Idlewild - Install a broadband network in historic Idlewild and Yates Wireless Township. Idlewild, Michigan Transformation Initiative -- New Township Hall - Build new township governmental facility for Yates Township; township hall include multi-use community spaces.

HAL

Yates Township, Lake County

Idlewild Public Library Restoration - Provide handicap accessibility, technology Idlewild, Michigan Transformation Initiative -- upgrades, complete renovation of public and office spaces, shelving and storage library restoration areas, restrooms, elevator, electrical, heating, plumbing, and roof.

Mackinac Island

Create energy efficiencies for eight historical structures on Mackinac Island by installing more energy efficient roofs, recalking and painting. This work will secure the future of one of Michigan's best-known and strongest income-producing tourism 5/1/2009 Mackinac Island Historic Structure Restoration attractions.

HAL

HAL HAL

HAL

HAL

Mackinaw City

HAL

i m

b u S

HAL

Negaunee Tshp/Marquette Cty

02262009

Iron Industry Museum Trail

O R

3/1/2009

P P A

6/30/2009

D VE $

800,000

$

250,000

500,000

5/1/2009

12/31/2009

$

1,500,000

5/1/2009

2/1/2010

$

1,200,000

5/1/2009

5/1/2010

$

2,000,000

10/30/2009

$

538,000

Repair and paving of entrance and parking lot for the Historic Mill Creek Discovery Park. Includes Storm water management utilizing rock retention areas. Project uses recycled concrete aggregate pavement, which considering all the road work that will be going on is a good way to recycle the old pavement from other projects. 5/1/2009

10/30/2009

$

574,350

LearningExpress Library test prepration and practice test online database currently on Michigan eLibrary (http://www.mel.org). Subscription renewal for 10/1/09-9/30/12. Subscription expires 9/30/2008 with no funds to extend beyond that date. 10/1/2009

9/12/2009

$

450,000

The planned trail will combine recreation with interpretation of the environment, Native Americans and the iron industry. The trail will extend the tourist/education experience at the Michigan Iron Industry Museum from 1.5 hours to a half day by adding approximately 2 miles of interpretive trail and bridging the Carp River to the site of the first Great Lakes iron forge. The interpretation of the forge site will demonstrate minimal environmental impact using signage and foundation outlines instead interpretive structures. Local lodging and restaurants will benefit from longer tourist stays in the community. The trail connects to the 40-mile Iron Ore Heritage Trail that is beginning construction. Phase one is funded ($261,000 Natural Resources Trust Fund; $75,000 private contributions) and is scheduled for 2009 summer construction. This will allow the full project to be completed and increase employment on the project. Need is $450,000. 6/1/2009

9/30/2009

$

786,600

u q e

R d

Submitted Requests - Not Approved

Route (Infrastructure Only)

Groveland- Martin 1,000,000 to 12 Mile Road

$

t s e

e t tt

5/1/2010

$

12/31/2009

N s

Online Job Training and Testing

11/1/2009

Funding Request

5/1/2009

T O

Paving Paving Lot and Entrance

Expected Completion Date

1148 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

HAL

HAL

Marquette County

Delta County

Project Name

Project Description

Start Date

Expected Completion Date

Iron Ore Heritage Trail

This 40-mile recreational and interpretive trail is being developed by the local recreational authority. This phase will use a permeable surface as a demonstration project. The trail will grow the recreational and heritage tourism economy of the region and provide healthy lifestyle opportunities for residents. MDOT Enhancement, MCACA and Natural Resources Trust Fund support has begun the work. Phase III funding would provide employment this summer. 5/15/2009

Fayette Building Renovation

This project will evaluate, test, and deploy energy eficiency and renewble energy elements on one of the historic buildings at Historic Fayette Townsite, a DNR park. It will help the state meet its 45% by 2020 goal. It will alsoincrease the tourism potential of the site by adding not only more things to do, but new subject matter—energy efficiency, archaeology and Native Americans. Restoration could be linked to workforce training (below) in preservation woodworking, plastering and other preservation skills—skills applicable to historic cities and neighborhoods across the state. The weatherization and rewiring of the building will improve energy efficiency. 6/1/2009

D VE $

1,300,000

10/31/2009

$

265,000

6/1/2010

$

380,000

7/1/2009

$

27,500

Thunder Bay National Marine Sanctuary

Rennovate Great Lakes Heritage Center to incorporate renewable energy and energy efficiency practices and interpretation in an Energy Demonstration Center (LEEDS certified). Work will include wind and/or solar power along with existing geothermal energy, white roof and insulated block. The EDC will feature the Sanctuary's planned fuel cell powered boat and hybrid vehicle. It will feature the high technology Science on the Sphere programs created by NOAA and projected on a 3-dimensional globe (already purchased). The programs cover environmental and climate change education and include one on green technology. Thunder Bay is also considering creating an alternative fuel festival/workshop. The project will complement the Center of Energy Excellance established in the area by MEDC. 6/1/2009

10/31/2010

$

350,000

Historic Preservation Trades Training

Training in specialized traditional building skills utilzing state and local historic places as training sites using Historic Preservation Network Program. Skills are needed in the historic building reuse and rehabilitation fields, particularly for restoring urban neighborhoods. The program is part of the Michigan Green Corps plan. 6/1/2009

6/1/2011

$

1,050

Historic Structures Infrastructure

Support for state and local government and non-profit organizations to green, rehabilitate and restore public historic structures including museums, city halls, county courthouses, libraries and other historic buildings through existing federally funded matching grant program. 7/1/2009

12/30/2011

$

1,500,000

T O

10/31/2009

Funding Request

P P A

O R

This project will evaluate, test, and deploy energy eficiency and renewble energy elements on one of the historic buildings at Walker Tavern in a DNR park. It will help the state meet its 45% by 2020 goal. It will upgrade the Hewitt House, including weatherization (roof, siding, insullation) and new electric system with energy efficient fixtures, and renewable energy. The building serves as the visitor center at a DNR/HAL state park. The upgrades will provide energy conservation and allow the center to expand its role in supporting tourism along the US-12 heritage route, as well as increasing local tourism in the Irish Hills. An MDOT Enhancement Grant is supporting the project. Additional funds will allow quick completion of work on the roof and siding and installation of energy efficient fixtures. Amount needed is $80,000. 5/1/2009 Energy efficiency at the new museum collections storage facility can be greatly improved by creating an air-lock for the overhead doors. 4/1/2009

Route (Infrastructure Only)

N s

HAL

Brooklyn

Walker Tavern Renovation

HAL

Lansing Tshp

MHC Storage Facility

d e tt

HAL

HAL

HAL

Alpena

b u S

Throughout state

Throughout state

02262009

t i m

t s e

qu

e R

Submitted Requests - Not Approved

1149 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

State Captitol Energy Conservation

Implement energy efficiency practices in the State Capitol through roof improvement, HVAC improvement and lighting. The best way to move the Capitol towards 45% by 2020 energy efficiency is to make sure it is sealed against the outside weather. Recent work has developed a successful roof-sealing process on the wings; completing that work on the west side and north and south ends of the roof is needed ($950,000.00). The limited non-copper parts of the roof (about 10%) will be white roofed. Cleaning, treating and tuckpointing the exterior stone and repairs at the north first floor entrance will complete the weatherization of the building ($120,000). Failure to do this now will result in higher energy costs and in higher repair costs later. Furthe energy conservation will come from replacing the HVAC drive motors and adding frequency drives ($75,000), updating the control system ($225,0000--currently costing $30,000 a year in repair parts), and replacing the parking lot lights ($15,000) with inductive lighting that is energy rated. (LED is not cost effective at this time.) 5/15/2009

O R 9/10/2010

$

1,385,000

Highland Park Library Energy Conservation

Replace building HVAC and lighting systems with energy efficient, modern systems and weatherize building with tuck-pointing and window repair--a Cities of Promise signature project. With LEED certification, this public building could become a Detroit area green education site interpreting the energy conservation/green measures. Reopening the building to public use, which will create long-term local jobs and local access to information. 5/15/2009

12/30/2010

$

4,000,000

2010 US Census

Funding for communications and outreach in Michigan as part of Complete Count project for the 2010 US Census. A complete count increases the level of funding for many federal programs through the following decade. 4/1/2009

4/1/2011

$

3,000,000

Eaton County

Community Dental Clinic

Affordable dental care is a significant issue for County residents. Therefore, a dental clinic to meet the needs of low income and Medicaid eligible residents at discounted rates will be constructed. March, 2009

August, 2009

$

900,000

Delta Township

Upgrade system using micro-turbine systems to capture more renewable resources Wastewater Utility Plant Upgrade - Renewable from the wastewater that is being produced resulting in a 30 percent less energy and Resource and Energy Conservation Project fossil fuel consuption and 25 percent less in operation and maintenance costs. 6/9/2009

5/10/2009

$

1,400,000

Delta Township

Rehabilitation - System Upgrades

Upgrade and replace existing Bellaire Hills sanitary sewer pump station; replace watermain Saginaw Hwy., Elmwood to Creyts; replace watermain St. Joe Hwy., Waverly to Creyts; replace watermain Dibble, Saginaw to St. Joe; replace watermain Hume, Michigan to St. Joe 4/9/2009

10/10/2009

$

2,271,000

Delta Township

Delta Township

10/10/2009

$

2,278,000

Delta Township

Delta Township

Watermain installation in Gettysburg Farms West subdivision; sanitary sewer New Construction of watermains and sanitary installation Nixon & St. Joe west of Nixon; watermain installation in St. Joe Hwy., west sewer of Nixon 4/9/2009 Retrofit outdated florescent light fixtures to energy efficient T-8 fixtures in the Lighting Upgrade Township Admin. Building 4/9/2009

6/9/2009

$

17,700

Delta Township Delta Township

Mt. Hope Park Delta Patrol Station

Develop Mt. Hope Park - entry sign, youth soccer fields, youth baseball/softball fields, tennis courts, picnic shelters, playscapes, restroom/equip. building, pubic utility service extensions, parking area landscaping, vehicle drive, turf seeding, kompan playscape, miscellaneous permitting 6/9/2009 New Construction of a Delta Patrol Station which will be LEED certified 6/9/2009

6/10/2009 6/10/2009

$ $

1,215,043 5,600,000

Radio water meter reading program

Retrofit current water meters with radio transmitters that will allow all meter readings to transmit to a central location. This would eliminate the need for vehicles to do this job, thus saving on gasoline and reducing carbon emissions. 6/9/2009

12/9/2009

$

1,500,000

Wastewater Utility Plant Upgrade

This project would result in a cleaner effluent going into the river and would increase the capacity of the plant from 6 to 8 million gallons per day, in addition to technologica advances, energy conservation, resource recovery, and automation. 7/9/2009

1/12/2009

$

34,600,000

HAL

Lansing

HAL

Highland Park

HAL

Eaton County

Delta Township

Delta Township

Delta Township Delta Township

Delta Township

Delta Township

Delta Township

02262009

tt i m

d e t

ub

q e R

s

st

e u

S

Delta Township

A T

PP

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

1150 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Delta Township

Delta Township

Project Name Replace older diesel engine vehicles with green fleet

Delta Township

Delta Township

New Water Tower

Project Description Start Date Replace six large utility trucks, two front end loaders, one two-ton flat bed dump truck, and a1986 blazer 4 x 4 with plow with green fleet. 6/9/2009 The project would provide additional storage for peak flows west of I-96. It would be a one-million gallon water tank. 7/9/2009

Delta Township

Delta Township

Retrofitting township buildings to become more energy efficient

Install 14 Skytream 3.7 wind generators and 8 4 k W photovoltaic solar panals at five different township buildings. The total estimated energy generated would be 34.6 kw 7/9/2009

Inkster Road from 9 Mile Road to 11 Mile Road

Inkster Road from 9 Mile Road to 11 Mile Road - The project with an estimated cost of $2.3 million includes pulverizing and cold milling the existing 2 lanes of pavement and overlaying with 3” to 6.5”of new asphalt pavement, repairing driveway approaches, and drainage improvements. It also includes new concrete curb and gutter near the river crossing and new cross culverts, headwalls and guardrails at the Rouge River crossing. This portion of Inkster Road is in very poor condition. This project is presently on the Transportation Improvement Program (TIP) project list for Federal funding in 2012. The proposed federal economic stimulus will most likely advance the project start date. 7/1/2009

Evergreen Road 10 to 11 Mile

Evergreen Road from 10 Mile Road to 11 Mile - The project with an estimated cost of $12.0 million includes the reconstruction of the existing roadway as the geometrics currently exist with new concrete pavement, and improved storm sewers where required. The Proposal also includes extending the existing 54” storm sewer located at the Northeast corner of the North driveway of the Civic Center to the Rummell County Drain. Currently the Civic Center utilizes a small pump system to pump storm runoff to the original drains located in Evergreen Road, which are substantially under capacity and cause standing water on the roadway. The Construction costs will also allow for an alternative design that includes a narrow four lane boulevard which can be built within the existing Evergreen Road right-of–way. This alternative design will be able to accommodate geometrics in accordance with the City’s Master Planning in this area. Evergreen Road is the main roadway through the Central Business District of the City. As such, improving this road may stimulate redevelopment opportunities in the surrounding area. 7/1/2009

City of Southfield

Southfield

T O

Expected Completion Date 12/9/2009

$

875,000

7/10/2009

$

1,500,000

$

309,000

$

10,000,000

1/10/2009

O R

P P A

Funding Request

9/30/2010

D VE

Route (Infrastructure Only)

N s

t s e

City of Southfield

Southfield

u q e

9/30/2010

R d

City of Southfield

Southfield

i m

Evergreen Road 8 to 9 mile

b u S City of Southfield

Southfield

02262009

e t tt

11 Mile Road

Evergreen Road from 8 Mile Road to 9 Mile Road - The project with an estimated cost of $3.5 million includes the removal and reconstruction of the existing concrete pavement section. The new road will be a minimum of three lanes throughout the project, widening to five lanes at both the 8 and 9 Mile intersections. The new road will be curbed and the drainage system improved. The estimate also includes the replacement of the traffic signals at 8 Mile, Midway, and 9 Mile, if necessary. This road serves as a gateway into the City of Southfield and is a major artery through the City. Improvements would address existing capacity, safety and drainage issues and would aesthetically improve the corridor in this area. 7/1/2009

11 Mile Road Paving----Inkster to Pebble Creek - The project with an estimated cost of $2.0 includes the milling of the existing road surface and widening to three lanes at the East end of the project near Pebble Creek while maintaining the existing three to five lanes to the Inkster Road intersection. The existing pavement surface will be milled 3 inches deep. Any manholes, gate wells, etc., requiring work within the pavement area will be repaired and/or adjusted. The existing concrete will be cracked and seated and then overlaid with three inches of asphalt. Traffic will be maintained while the work is being done. The project length is approximately 2800 lineal feet. Five lanes tapering down to a three lane road. 7/1/2009

Submitted Requests - Not Approved

9/30/2010

9/30/2010

11 Mile Road Paving----Inkster to Pebble Creek

1151 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

City of Southfield

Southfield

11 Mile Bridge Pernick Drain

City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield

Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield

Heliport ADA Pool John Grace Senior Center Street Pave Civic Center McDonnell Tower Public Safety Northland Dr Providence Dr Sidewalk Bridge Paths Pernic Drain M-10 Franklin Rd Lighting

City of Southfield City of Southfield City of Southfield

Southfield Southfield Southfield

Town Ctr Greenfield Inkster Rd

City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield

Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield Southfield

Telegraph Evergreen 8 to 9 Sec 13 Washington Hts. CDA streetscape Evergreen Ten Transit Center 11 Transit Center CDA SCADA Pump Station Beech Woods

City of Southfield

Southfield

City of Southfield City of Southfield City of Southfield City of Southfield City of Southfield

Southfield Southfield Southfield Southfield Southfield

City of Southfield

Southfield

02262009

Project Description

Start Date

Expected Completion Date

11 Mile Road Bridge at the Pernick Drain - The project with an estimated cost of $1.25 million includes total replacement of the bridge with a four sided precast concrete box culvert while maintaining traffic to this section of 11 Mile Road, as it is a dead end culde-sac roadway. The project requires that a temporary roadway be built to the South of the existing structure, as well as relocation of overhead wires to allow placement of the new precast concrete segments. The new structure will be 24 feet wide by 7 feet high and will allow for the placement of a sidewalk across the structure. The 11 Mile Road Bridge is approaching the end of its useful life, does not qualify for Local Bridge Improvement Program funds, and is the only access for several large industrial properties. 7/1/2009 Heliport at Town Center Transit (11& Lahser), construction and acquisition of impact area 7/1/2009 Town Center with accessible locker roonms 7/1/2009 employment training center - rec cent 7/1/2009 Senior Center 7/1/2009 local street pavement 7/1/2009 energy efficiency improvements - Civic Center 7/1/2009 energy improvements - McDonnell Tower 7/1/2009 community policing programs 7/1/2009 CDA Northland Dr. streetscape traffic control improvements 7/1/2009 CDA Providence Dr. - streetscape traffic control improvements 7/1/2009 CDA sidewalk-connections and ADA upgrades 7/1/2009 Beech Road Bridge 7/1/2009 non-motorized paths 7/1/2009 11 Mile Road over Pernic Drain 7/1/2009 CDA M-10 streetscape, traffic control improvements 7/1/2009 Franklin Road from American Road to 11 Mile Road 7/1/2009 street lighting change out Civic Center Dr. 7/1/2009

T O

P P A

N s

t s e

qu

O R 9/30/2010

Funding Request

D VE

9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

10,000,000 8,200,000 12,000,000 15,000,000 30,000,000 10,000,000 2,500,000 900,000 425,000 520,000 765,000 1,000,000 1,000,000 1,250,000 1,470,000 16,000,000 1,800,000

Town Centre Corridor Improvement Auth streetscape, traffic control improvements CDA Greenfield Road streetscape, traffic control improvements Inkster Road from 9 to 11 Mile Telegraph Technology Corridor Improvement Auth - streetscape, traffic control improvements Evergreen Rd. from 8 Mile to 9 Mile Rd. local street repairs section 13 & water main rehab/replacement Washington Heights, including drainage improvements CDA streetscape improvements Evergreen Rd. from10 Mile Rd. w. drainage improvements with streetscape Transit Center at Towne Center (11 & Lahser) Transit Center at CDA SCADA System upgrade sanitary pumping station rehab and upgrades storm and watershed management projs Beech Woods Greening Report

7/1/2009 7/1/2009 7/1/2009

9/30/2010 9/30/2010 9/30/2010

$ $ $

3,250,000 1,620,000 2,300,000

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010

$ $ $ $ $ $ $ $ $ $ $

3,750,000 35,000,000 7,000,000 7,000,000 5,308,650 15,000,000 4,500,000 4,840,000 700,000 1,000,000 2,000,000

Detention Ponds

strom and watershed management projs detention pond retrofits (various sites)

7/1/2009

9/30/2010

$

2,000,000

Holy Sepulcher LTU wetlands Leak Detect Nature Center Rouge River

storm and watershed management projs Holy Sepulcher storm retention proj storm and watershed management projs LTU wetlands system-wide leak detection program for water conservation storm and watershed management projs Carpenter Lake Nature Center storm and watershed management projs Rouge River Green Corridor

7/1/2009 7/1/2009 7/1/2009 7/1/2009 7/1/2009

9/30/2010 9/30/2010 9/30/2010 9/30/2010 9/30/2010

$ $ $ $ $

2,000,000 2,000,000 1,000,000 2,000,000 3,000,000

West side

storm and watershed management projs septic program (located on west side of City) 7/1/2009

9/30/2010

$

4,000,000

t i m

d e tt

b u S

e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

1152 of 1238

Michigan Federal Economic Recovery - Request List

Location Submitting Agency City or Township City of Southfield Southfield City of Southfield Southfield City of Southfield Southfield

Tamarack meter change Sanitary rehab

City of Southfield City of Southfield City of Southfield

Streambank Water rehab Performing Arts Center

Southfield Southfield Southfield

Project Name

Project Description storm and watershed management projs MDOT Tamarack Basin meter change out program sanitary sewer rehab, city-wide storm and watershed management projs streambank and infrastructure erosion projs (throughout City) water system rehabilitation construction of a performing arts center at Town Center This project will complete the renovation, restoration of the only remaining historic theatre in the Eastern Upper Peninsula. Restorative work began in 2003 when the Soo Theatre Project, Inc. purchased the building. A board of directors in conjunction with 501C3 administration has managed to upgrade the building for minimal use and has developed programs and services in the performing arts. Final restoration of the theatre allows for year round delivery of theatrical performances and classic films.

Start Date 7/1/2009 7/1/2009 7/1/2009

Expected Completion Date Funding Request 9/30/2010 $ 4,000,000 9/30/2010 $ 6,500,000 9/30/2010 $ 5,000,000

7/1/2009 7/1/2009 7/1/2009

9/30/2010 9/30/2010 9/30/2010

O R

Route (Infrastructure Only)

D VE $ $ $

11,250,000 5,000,000 50,000,000

$

2,000,000

P P A

Plans are in place for completed renovation, restoration which include: using energy efficient and green technology strategies for: installing new roofs, heating/cooling , electrical, and plumbing systems; renovating upstairs studios and restrooms, auditorium, stage, lobby areas and dressing rooms; restoration of theatre façade and marquee. In addition are plans for elevator installation, and miscellaneous repairs.

T O

N s

The project is ready for completion. Estimates, architectural plans, energy efficient/green technology evaluations are available. There is priority, Board of Director, staff, and regional community support for projected renovations. Soo Theatre Project, Inc.

City of Troy

City of Troy

City of Troy

534 Ashmun Street Sault Ste. Marie, MI 49783 Soo Theatre Project, Inc.

e u

6/1/2009

Project reconstructs and widens John R Road from two lanes to five lanes. Included with the project are drainage improvements, traffic signal improvements and water main replacement. Eight-foot wide sidewalks along both sides of the newly constructed road along with American's with Disabilities Act compliant facilities are included as part of the project to provide for non-motorized modes of transportation. Fall 2009

eq

Dec 30,2009

Troy

John R Reconstruction and Widening, Long Lake to Square Lake

$

8,500,000

Troy

Project reconstructs and widens John R Road from two lanes to five lanes. Included with the project are drainage improvements, traffic signal improvements and water John R Reconstruction and Widening, Square main replacement. Eight-foot wide sidewalks along both sides of the newly Lake to South Blvd. constructed ro Fall 2009

$

7,000,000

Troy

The City of Troy has over 9,000 linear feet of streambanks that are severely eroded, causing critical and sometimes dangerous conditions in our local waterways. In addition, the sediment that is eroding is being displaced and causing sedimentation Streambank Erosion Correction Actions -- City problems in the waterways, including the destruction of habitat, and turbidity in the Wide water column, diminishing water quality for plants and wildlife. Summer 2009

$

7,000,000

$

6,200,000

R d

e t tt

i m

ub

S City of Troy

st

A Cool Cities grant jump started building renovation, restoration. The project now emp

Troy

02262009

Troy/Birmingham Intermodal Transit Center

The Cities of Birmingham and Troy are collaborating to design and construct an intermodal transit center along the common border which is a CN rail line, in the area of Maple and Coolidge Roads. The feasibility of the project was confirmed by the conceptual and preliminary engineering/design study conducted by Wendel Duchscherer of Amherst, New York. The scope of the project includes a 3,000 to 3,500 square-foot building and a tunnel under the CN rail line to connect the Cities of Birmingham and Troy. Since the land was dedicated for the project there is no land acquisition. In addition, the City of Troy Planning Commission and City of Birmingham Planning Board are initiating a Joint Planning Commission to plan and create joint development regulations for the Transit Center Area. Fall 2009

Submitted Requests - Not Approved

1153 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Troy

Troy

Major and Industrial Road Rehabilitation

City of Troy

Troy

Storm Water Detention Pond Retrofits

Rehabilitate major and industrial roads in poor condition by replacing deteriorated concrete pavement, crack filling and milling and overlaying severely deteriorated pavements with asphalt. Modification of residential storm water detention ponds to improve water quality and reduce downstream stream band erosion.

Wattles Road Reconstruction and Widening, East and West of Rochester Big Beaver and I-75 Interchange Enhancement

Project widens and reconstructs Wattles Road from two lanes to a new four-lane concrete boulevard. Included with the project are drainage improvements, traffic signal improvements and water main replacement. Eight food wide sidewalks along both sides of the newly constructed boulevard along with American's with Disabilities Act compliant facilities are included as part of the project to provide for non-motorized modes of transportation. Fall 2009 Addition of sustainable landscaping, detention basis and walkway improvements withi the Big Beaver/I-75 interchange. Summer 2009

Troy Museum & Historic Village-LEED Certified Expansion and Historic Restoration

The Troy Museum & Historic Village, owned and administered by the City of Troy, is scheduled to relocate and restore the 1837 Niles-Barnard Home to the Village, complete an adaptive reuse of the Village's 1927 Township Hall creating exhibit and education galleries, and install a storm water management system and other sustainable technologies in the buildings and village. This project adheres to the Department of the Interior Standards for Historic Rehabilitation and will achieve LEED certification. Summer 2009

Emerald Lakes Storm Water System Improvements

The Emerald Lakes Retention Ponds are a series of storm water wet ponds that have no pretreatment for storm water pollutants, including sediment, leaf litter and direct drainage impacts. The City will install several storm water treatment BMPs that would address pollutants in the retention ponds. The project would also include a directed educational campaign to all residents in the neighborhood, both riparian and those not living on the waterfront. Summer 2009

City of Troy

Troy

City of Troy

Troy

City of Troy

City of Troy

City of Troy

City of Troy

City of Troy

Troy

Troy

Troy

02262009

D VE

3,000,000

$

3,000,000

$

2,924,000

$

2,000,000

Dredge approx 5,000 cubic yards of sediment from an in-line retention pond, stabilize streambanks both upstream and downstream, and expand stormwater storage to prevent flooding and erosion for downstream properties. Several acres of wildlife habitat will be created with wetlands, and prairie landscapes being utilized as part of the ecological improvements to the area. In addition to the ecological improvements, the culverts downstream of the pond will be removed and replaced with box culverts. Summer 2009

$

1,600,000

Land Drain open channel and storm sewer improvements along Livernois, Big Beaver to Civic Center Drive. Peak storm water flows are diverted to new storm sewers for flood control while dry weather flows continue through the open channel drain. Summer 2009

$

1,500,000

Big Beaver and Rochester Park and Intersection Improvements

Park development within the Big Beaver business corridor consisting of sustainable landscaping, walkways and seating, detention basin, intersection cross walks and American's with Disabilities Act compliant facilities at all corners of the boulevard intersection to provide for non-motorized modes of transportation.

$

1,500,000

Ferry Drain Habitat Restoration

Design and construct streambank stabilization and habitat restoration projects for the Ferry-Renshaw Drain. This will include the restoration of the fisheries habitat, streamside habitat and dredging of accumulated sediment in the stream channel. Riparian area improvements include the installation of buffers, trees for increasing shade in the stream channel and lunker structures for habitat creation.

$

1,200,000

ub

A T

s

t s e

O N

u q e

Submitted Requests - Not Approved

O R

PP

R d

e t tt

i m

Summer 2009

Summer 2009

Route (Infrastructure Only)

6,000,000

$

S City of Troy

$

5,500,000

Lane Drain Flood Control

Troy

Summer 2009

Funding Request

$

Aquatic Center Pond Dredging, Ecological Improvements and Culvert Replacements

Troy

Expected Completion Date

1154 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

City of Troy

Troy

Loving Flood Control

Storm sewer improvements along Lovington, Minnesota to Dequindre. The project consists of approximately 2,400 feet of forty-eight inch diameter storm sewer along Lovington. This section of the city is a low and moderate income area located largely within the floodplain. This project is the last phase of a large multi-year drainage improvement project for this area. Summer 2009

City of Troy

Troy

Sanitary Sewer Extensions

Extend sanitary sewers to residential areas of the city currently not served by sewers. Summer 2009

Section 14 Flood Control - Storm Sewer Improvements along Bradley, Glaser, Lamb and Rockfield

Improvements are part of a flood control project within a 62-acre localized drainage district in an existing residential area adjacent to Troy Athens High School. During rain events, localized flooding in this area is prevalent. The project will alleviate the flooding through construction of a new storm sewer system consisting of eight inch to twenty four inch storm sewers. Summer 2009

McCulloch Drain Flood Control

Storm sewer improvements along Troywood, Rochester to the west end. These improvements are part of a large flood control project within the 3,000 acre McCulloch Drainage District. Several portions of the improvements have been completed to date, with a proposed 2.5 million cubic foot storage facility proposed in the future. The project on Troywood consists of approximately 2,600 feet of thirty six inch diameter storm sewer within the center of the road. Summer 2009

City Hall Rainwater Collection System

Retrofit the existing storm water drainage system from City Hall and surrounding buildings to a central collection system. This cistern will be a collection point for rainwater to be used as irrigation for the Civic Center Grounds.

City of Troy

City of Troy

City of Troy

Troy

Troy

Troy

City of Troy

Troy

Old Stone School Restoration

City of Troy

Troy

Storm Water Detention Pond Retrofits

City of Troy

City of Troy

City of Troy

d e tt

Expected Completion Date

T O

N s

P P A

O R

Summer 2009

t s e

Funding Request

D VE $

1,000,000

$

1,000,000

$

1,000,000

$

750,000

$

500,000

Complete necessary repairs and restoration on a municipally owned, locally designated, historic resource. The Old Stone School (1860) requires structural repairs to roofs, windows, plumbing, electrical wiring, HVAC, ADA compliant restrooms and entries and exterior and interior painting and parkig to make available for public use. Summer 2009 Modification of residential storm water detention ponds to improve water quality and reduce downstream stream bank erosion. Summer 2009

$

500,000

$

300,000

To mitigate the increased storm water runoff from previous surfaces in residential areas (rooftops, sidewalks, driveways), the city of Troy will provide rain barrels for residential use at a decreased costs to all City homeowners. The City will purchase a large quantity of rain barrels, and then disperse them at cost to interested residents. This program will also include a focused eduational campaign addressing the importance of storm water runoff and residential impacts. Summer 2009

$

210,000

qu

e R

Troy

Residential Rain Barrel Program

Troy

Stephenson Highway Storm Water Retrofit Project

Install curb cuts in Stephenson Highway curbs to allow for storm water runoff to enter the medians. Medians will be planted with a wet prairie wildflower mix to enhance the native landscape. Signage and education materials will be included in this project. Summer 2009

$

80,000

Rain Gardens in City Owned Parking Lots

Installing rain gardens within existing City Hall Parking Lots will function as a demonstration project to visitors to City Hall about the importance of runoff reduction. The City will install a rain garden in the Aquatic Center Parking Lot. Included in this project will be an educational component, including signage and materials. Summer 2009

$

70,000

Troy

02262009

it

S

m b u

Submitted Requests - Not Approved

Route (Infrastructure Only)

1155 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Oakland County

Independence Township

Project Name

Project Description

52-2 District Court Building Project

Start Date

Expected Completion Date

This project would construct a new district court building in Independence Township Michigan on land currently owned by the County. The existing leased facility has been overcrowded since the addition of a judge and supporting staff in 2003. The building is so space deficient the judges, public, and defendants all use the same corridors resulting in security and safety issues. Increased population in the area served by this court has resulted in larger case loads which place additional burden on the building. Parking at the existing facility has always been marginal and there is no room on the existing site for building or parking expansion. 10/1/2009 This project would construct a new 1000 foot long concrete steam tunnel to supply steam generated at the County’s central steam plant to the Medical Care Facility and Sheriff’s Administration Building. Other infrastructure utilities also would utilize this tunnel to provide service to the buildings. An existing corrugated steel tunnel, constructed nearly 40 years ago, is quickly deteriorating and has required remedial efforts to remain functional. 10/1/2009

P P A

O R 5/1/2011

Funding Request

D VE $

24,900,000

10/1/2010

$

5,230,000

Oakland County

Waterford Township, City of Pontiac Steam Tunnel Replacement Project

Oakland County

This project would address the need for several needed infrastructure replacements and enhancements on the Oakland County Service Center. Repair would be made to Waterford Township, City Roadway, Parking Lot and Sidewalk Program County Center Drive East and several campus parking lots. A long planned sidewalk of Pontiac Project and pathway program would be implemented. 10/1/2009

12/1/2010

$

4,980,000

Oakland County

Waterford Township, City of Pontiac, City of Auburn Hills Roof Replacement Program Project

This project would replace eight roofs on the following County buildings: Children’s Village School, B, C, and D Buildings; Sheriff’s Marine Storage; Trusty Camp Building Animal Care; and the Health Building. 5/1/2009

10/1/2010

$

1,595,000

Oakland County

Waterford Township, City of Pontiac Mainland Storm Drain Improvements Project

This project would improve and reroute various sections of the Mainland Storm Drain to eliminate sediment, improve water flow, improve natural habitat, and enhance the existing wetland. This project would reconstruct sections of the Mainland Storm Drain and the Pontiac Creek Extension Drain. Flood control and habitat improvements are the primary goals of the project. 10/1/2009

4/1/2011

$

4,990,000

Oakland County

Waterford Township/Pontiac/Southfie ld Michigan Mechanical Equipment Replacement

Mechanical equipment replacement projects (HVAC and Boiler Equipment)

$

450,000

Oakland County

Waterford Township/Pontiac Michigan

Primary Electrical System Maintenance

Primary electrical system maintenance project

$

735,000

Oakland County Oakland County

Waterford Township/Pontiac Michigan Pontiac, Michigan

Chiller Replacement North Oakland Health Center Renovation

Chiller replacement project Renovation of the North Oakland Health Center projec

$ $

1,480,000 3,800,000

Tondu Corporation

Filer City Township, Manistee County, Michigan

Filer Carbon Capture and Emission Control Project:

5/1/2012

$

120,000,000

L'Anse Area Schools

L'Anse, Michigan

Elevator Project

8/28/2009

$

300,000

L'Anse Area Schools

L'Anse, Michigan

4/6/2009

8/28/2009

$

350,000

L'Anse Area Schools

L'Anse, Michigan

Elementary School Boiler Replacement

6/1/2009

8/28/2009

$

75,000

L'Anse Area Schools

L'Anse, Michigan

IE Building Boiler Replacement

6/1/2009

8/28/2009

$

35,000

L'Anse Area Schools

L'Anse, Michigan

IE Building Door Replacement

6/1/2009

8/1/2009

$

5,000

N s

t s e

u q e

R d

e t tt

i m

ub

S

02262009

T O

High School window project

A commerical scale facility to increase the efficiency and demonstrate the commercial capture and sequesterization of carbon dioxide and reduction of emissions from an existing coal and biomass fueled power plant. 5/1/2008 School elevator needs updating to comply with code. It is used primarily for those with physical limitations and handicaps 4/6/2009 High school windows are very old (approximately 40) and in need of replacement Replacement of existing Elementary School Boilers installed in 1966 with energy efficient Aerco Benchmark Boilers. Replacement of existing Industrial Education Building Boilers with energy efficient Boilers. Replacement of existing Industrial Education Building doors with new energy conserving doors.

Submitted Requests - Not Approved

Route (Infrastructure Only)

1156 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency L'Anse Area Schools

L'Anse, Michigan

Project Name Elementary & High School Building Door Replacement

L'Anse Area Schools

L'Anse, Michigan

Elementary School Lighting Replacement

Project Description Start Date Replacement of existing Elementary & High School Building doors with new energy conserving doors. Existing doors are 35 to 40 years old. 6/1/2009 Replacement of existing Elementary School Building classroom lights with new energy efficient fixtures. 6/1/2009

Expected Completion Date

Funding Request

8/1/2009

$

25,000

8/1/2009

$

15,000

March, 2011

$

3,967,494

D VE

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Attwood Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

Lansing School District - Averill Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

March, 2011

$

3,683,804

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Bingham Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

March, 2011

$

3,167,659

T O

P P A

O R

Route (Infrastructure Only)

N s

t s e

u q e

R d

e t tt

i m

02262009

b u S

Submitted Requests - Not Approved

1157 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Lansing School District - Cavanaugh Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

Lansing School District - Cumberland Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Elmhurst Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

4,250,096

March, 2011

$

4,031,200

March, 2011

$

5,611,940

N s

d e tt

02262009

t s e

qu

e R

t i m

S

ub

Submitted Requests - Not Approved

1158 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Fairview Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

3,442,131

March, 2011

$

4,323,127

March, 2011

$

4,498,948

N s

Lansing School District - Forest View Elementary School

d e tt

Lansing School District Lansing, MI

02262009

t i m

S

ub

Lansing School District - Gier Park Elementary School

t s e

qu

e R

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1159 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

P P A

Lansing School District Lansing, MI

Lansing School District - Grand River Elementary School

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Kendon Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

3,906,829

March, 2011

$

3,826,550

March, 2011

$

4,711,329

N s

qu

d e tt

Lansing School District Lansing, MI

02262009

t s e

t i m

S

ub

e R

Lansing School District - Lewton Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1160 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Lansing School District Lansing, MI

Project Name

Project Description

Start Date

Expected Completion Date

Lansing School District - Lyons Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District - Moores Park Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

3,153,642

March, 2011

$

4,084,327

March, 2011

$

5,097,378

N s

Lansing School District Lansing, MI

d e tt

Lansing School District Lansing, MI

02262009

t i m

S

ub

Lansing School District - Mount Hope Elementary School

t s e

qu

e R

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1161 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Lansing School District - North Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

Lansing School District - Pleasant View Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Post Oak Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

7,838,716

March, 2011

$

4,662,137

March, 2011

$

3,991,249

N s

d e tt

02262009

t s e

qu

e R

t i m

S

ub

Submitted Requests - Not Approved

1162 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Lansing School District Lansing, MI

Project Name

Project Description

Start Date

Expected Completion Date

Lansing School District - Reo Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District - Riddle Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

3,605,155

March, 2011

$

4,270,956

March, 2011

$

4,731,250

N s

Lansing School District Lansing, MI

d e tt

Lansing School District Lansing, MI

02262009

t i m

S

ub

Lansing School District - Sheridan Road Elementary School

t s e

qu

e R

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1163 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

P P A

Lansing School District Lansing, MI

Lansing School District - Wainwright Elementary School

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Wexford Elementary repairs to walkways and stairs;, upgrading high bay areas; and upgrading and School installing improved technology in the building. These building upgrades are required, i May, 2009

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

4,517,042

March, 2011

$

4,812,044

March, 2011

$

3,843,212

N s

qu

d e tt

Lansing School District Lansing, MI

02262009

t s e

t i m

S

ub

e R

Lansing School District - Willow Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1164 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Lansing School District - Woodcreek Elementary School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

Lansing School District - Eastern High School/Fieldhouse

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i July, 2009

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and Lansing School District - Everett High School installing improved technology in the building. These building upgrades are required, i July, 2009

Lansing School District Lansing, MI

Expected Completion Date

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

4,343,227

March, 2011

$

36,970,996

March, 2011

$

33,092,760

N s

d e tt

02262009

t s e

qu

e R

t i m

S

ub

Submitted Requests - Not Approved

1165 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Lansing School District Lansing, MI

Project Name

Project Description

Start Date

Expected Completion Date

Lansing School District - Gardner Middle School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i July, 2009

Lansing School District - Otto Middle School

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i July, 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

24,221,189

March, 2011

$

23,254,480

N s

Lansing School District Lansing, MI

d e tt

Lansing School District Lansing, MI

02262009

t i m

S

ub

Lansing School District - Pattengill Middle School

t s e

qu

e R

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i July, 2009

Submitted Requests - Not Approved

August, 2010

1166 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i July, 2009

P P A

Lansing School District Lansing, MI

Lansing School District - Dwight Rich Middle School

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and Lansing School District - Sexton High School installing improved technology in the building. These building upgrades are required, i July, 2009

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

March, 2011

$

25,527,558

March, 2011

$

31,110,656

August, 2010

$

11,116,979

N s

qu

d e tt

Lansing School District Lansing, MI

02262009

t s e

t i m

S

ub

Lansing School District - Beekman Center

e R

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1167 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Harley Franks Early repairs to walkways and stairs;, upgrading high bay areas; and upgrading and Childhood Center installing improved technology in the building. These building upgrades are required, i May, 2009

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and Lansing School District - Hill Vocation Center installing improved technology in the building. These building upgrades are required, i May, 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

August, 2010

$

3,205,625

August, 2010

$

27,760,028

August, 2010

$

4,147,000

N s

qu

d e tt

Lansing School District Lansing, MI

02262009

t s e

t i m

S

ub

Lansing School District - Administration Building

e R

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

Submitted Requests - Not Approved

1168 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete repairs to walkways and stairs;, upgrading high bay areas; and upgrading and installing improved technology in the building. These building upgrades are required, i May, 2009

P P A

Lansing School District Lansing, MI

Lansing School District - Service Center

Lansing School District Lansing, MI

The scope of work involves major building upgrades in the areas of general building renovations; replacement of asbestos floor toile and carpeting; replacement of ceilings; replacement of student lockers; upgrading gymnasium bleachers; upgrading restrooms and restroom accessories for ADA and Code compliance; masonry restoration; upgrading of obsolete elevators; upgrading obsolete fire protection systems; upgrading and replacement of mechanical and plumbing systems such as boilers, control systems, air conditioning systems, steam traps, pneumatic systems and other heating systems; replacement of roofs; replacement of exterior doors and windows; renovation of auditorium seating and rigging; replacement of movable partitions; upgrading and replacement of food service equipment; upgrading swimming pool (plumbing, mechanical and electrical) systems; upgrading athletic fields, play areas and playgrounds; asphalt repairs to parking lots; exterior concrete Lansing School District - Vehicle Maintenance repairs to walkways and stairs;, upgrading high bay areas; and upgrading and Center installing improved technology in the building. These building upgrades are required, i April, 2009

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

August, 2010

$

5,989,285

August, 2009

$

7,347,953

$

Pleasant Lake and 6,000,000 White Lake

N s

Henrietta Township Jackson County

Henrietta TownshipJackson County Michigan Pleasant/White Lake Sewer Project

Henrietta Towship Jackson County Michigan

Henrietta Township Jackson County Michigan Industrial Park Road Paving

Henrietta Township Jackson County Michigan

t s e

qu

e R

Sewers in rural area of Pleasant and White Lake-High Density -Small Lots deteriorating septics.

240 Days from Project Approval

360 days from project approval

Pave Industrial Park Roads to improve potential sale of lots to light industry and create jobs.

30 Days from project approval

30 days from project start

$

Henrietta Towship Industrial Park and 150,000 Recycling Center

Henreitta Township Jackson County Michigan Fire Department Training Center Expansion

Expand existing fire department structure to accommodate training facility for township and surrounding area departments and house equipment.

30 days from project approval

90 days from project start

$

350,000

Henreitta Township Jackson County Michgan

Henreitta Township Jackson County Michigan Recycling Center Expansion Rennovation

Exand/Rennovate existing Recycling Center to accommodate increased use by surrounding communities

30 days from project approval

90 days from start date

$

250,000

Henreitta Township Jackson County Michigan

Henreitta Township Jackson County Michigan Township Offices-

Construct Township Offices-we are currently located in old school. (Library would relcoate and be attached to building)

90 days from Project Approval

180 days from start date

$

800,000

itt

02262009

u S

bm

d e t

Submitted Requests - Not Approved

1169 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Internet 2

Ann Arbor

Project Name

Project Description

Start Date

Requipping, Repurposing and Greening the Michigan Advanced Computing Center

The Michigan Advanced Computing Center (MACC), a 10,000 sq. ft. computer facility with power and cooling designed to meet the need for housing very high performance extremely reliable computing systems is also located in the MITC. With support from the infrastructure stimulus resources the MITC proposes to reequip and update the facility to make it available to organizations with a requirement for these capabilities anywhere in the state in a state-of-the art energy-efficient facility which will improve reliability, increase efficiency, and lower costs for the users. The resulting savings and capabilities will allow a organization across the State to gain access to advanced nextgeneration data facilities and technology. The total cost to make the MACC an exemplar in energy efficiency and make it available to organizations across the State will be $21 million. Immediate

Michigan Information Technology Center (MITC) - Conference Center Update

The MITC provides the State of Michigan with a facility that is connected throughout the State, the Nation and the World via the Merit and Internet2 networks. With this robust network facility already in place, an estimated $350,000 (a one-time capital upgrade cost of $172,000 and a three-year operating cost for technical support) of support from the infrastructure stimulus program would enable the MITC to offer highend video conferencing at reduced rates to existing businesses, emerging businesses and those working to bring new enterprises to the State of Michigan with world-class network facilities. In the current economic environment, if a broader section of the business community could have access to such facilities, we believe it will have a major impact on the economies of the State. The benefits would be realized by operating cost savings, eliminating unnecessary travel and all the costs associated with that. The grant would seek to provision equipment for the MITC and equipment to be used remotely. Immediate

T O

Internet 2

Ann Arbor

Expected Completion Date

O R

Funding Request

Route (Infrastructure Only)

D VE

P P A

N s

t s e

$

21,000,000

$

350,000

$

500,000

$

29,625,000

u q e

This is a proposal to complete the build out of the Michigan Information Technology Center's (MITC) fiber network in Ann Arbor and fully equip the MDF and lower level data center facility for Merit and Internet2. We could purchase higher performance optronics and network router/switches for our links and build a more robust server environment. This request for support from the infrastructure stimulus resources is approximately $500,000. This would allow for research and education access to vast amounts of storage retrieval systems which would also be of interest to the University of Michigan, a key stakeholder. It would also enable direct connectivity in support of the Wireless Washtenaw project, further enhancing access from rural parts of the county to national assets. This could be a model for the rest of the State in coordination with the next project; completing a state-wide fiber infrastructure. Immediate

R d

Internet 2

Ann Arbor

i m

Ann Arbor Fiber Infrastructure

b u S Merit Network

Ann Arbor

02262009

e t tt

Michigan Reach

6 months

A Merit Initiative for Rural Education Arts Community & Healthcare Michigan REACH, an initiative of Merit Network, Inc., is focused on enabling education, research, distance learning, healthcare programs and enhancing access to collaborative resources in support of libraries, community programs, emergency preparedness and response, tourism, government, employment initiatives, homeland security and other Immediate areas vital to rural Michigan communities. These critical capabilities are dependent on depending on broadband access which can be provided by the extension of Merit Network services weather and when and programs into remote areas and by further bridging the gap between Michigan’s project is approved 18 mos after start Upper and Lower Peninsulas.

Submitted Requests - Not Approved

1170 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Grand Rapids Public Schools

Grand Rapids

Grand Rapids Public Schools - Stocking Elementary

Stocking elementary is planned to house 400 students from Pre-K through 5th grade. The building would be approximately 60,000 square feet and be located on the curren 3.69 acre site. The current building was constructed in 1923 and would be demolished upon completion and occupancy of the new structure. New site work and playgrounds would be included. 6/1/2009

Grand Rapids Public Schools

Grand Rapids

Grand Rapids Public Schools Congress/Hillcrest Elementary

We plan to consolidate two old buildings - one completed in 1920, the other in 1956 into a single structure to accommodate 400 to 450 elementary students. 8/1/2009

Grand Rapids Public Schools - City Middle/High Grand Rapids Public Schools - Central High School

Complete renovation of forty-five year old building to convert to a 800-student 6-12 International Baccalaureate program, with emphasis in economicology. Tuckpointing, HVAC upgrade and window replacement on a ninety year old high school building

Grand Rapids

Grand Rapids Public Schools - Blandford Nature Center

Replace four twenty year old portable classrooms with a more permanent structure supporting a thematic 6th grade program located on the grounds of Blandford Nature Center. 6/1/2009

Grand Rapids

Grand Rapids Public Schools - district-wide

Grand Rapids

Grand Rapids Public Schools - district-wide

Replacement of inefficient windows and doors with energy-efficient systems 6/15/2009 Replacement of several leaking and inefficient roofs throughout the district, enabling us to protect our physical assets and extend useful life. 6/15/2009

Grand Rapids

Grand Rapids Public Schools - district-wide

Replace existing lighting with energy-efficient systems

Grand Rapids

Grand Rapids Public Schools - district-wide

Grand Rapids

Grand Rapids Public Schools - district-wide

Grand Rapids

Grand Rapids

Grand Rapids Public Schools Grand Rapids Public Schools Grand Rapids Public Schools Grand Rapids Public Schools Grand Rapids Public Schools Grand Rapids Public Schools Grand Rapids Public Schools

Grand Rapids Public Schools Grand Rapids Public Schools

Grand Rapids Public Schools

Grand Rapids Grand Rapids

Expected Completion Date

14,000,000

$

15,525,000

8/15/2010

$

16,900,000

8/15/2009

$

3,000,000

8/15/2009

$

2,000,000

8/15/2010

$

1,700,000

8/15/2010

$

4,000,000

6/15/2009

8/15/2009

$

700,000

Replace outdated and inefficient boilers in several locations

6/15/2009

8/15/2010

$

665,000

6/15/2009

8/15/2010

$

8,000,000

Grand Rapids Public Schools - district-wide

Convert 27 of our buildings to digital control and monitoring of the HVAC systems, This project would result in substantial energy savings, and enable us to effectively control heating and cooling systems throughout the district. Classroom renovations, ADA upgrades and environmental upgrades enhancing learning environments for students throughout the district

6/15/2009

8/15/2010

$

3,000,000

Grand Rapids Public Schools - Central High School

Interior renovation, modernization and addition including laboratory and related space to implement 9-12 Health Sciences Center of Innovation on the Central High School campus in conjunction with public and private partners 6/15/2009

8/15/2010

$

15,000,000

d e tt

A T

s

t s e

O N

qu

e R

O R

PP

6/1/2009

City of Morenci

City of Morenci

City of Grand Ledge

City of Grand Ledge

The E. Main Street Bridge is located within the city limits of Morenci. Main Street is a Major street within the City of Morenci and has a Naional Functional Classification of Rural Major Collector. The structure is currently open to traffic with an ADT of 2500 vehicles per day in 1997. In December of 2007, the bridge was posted at 21 tons for a 1-unit truck, 30 tons for a 2-unit truck, and 42 tons for a 3-unit truck. If the structure was closed, the detour would have a direct effect upon local industries, businesses, and commuters. An alternative route would be available for local traffic that would be an additional 3-mile route around the bridge construction, although this route cannot be used for the main detour of traffic due to the use of a local roadway in the adjacent township. Main Street outside the city limits is an "All-Season" Roadway Primary County Road. To keep truck traffic on "All-Season" roads, the detour would use the Bridge Replacement: City of Morenci E. Main State Highway system in Ohio. The shortest detour route would be 23 miles. This detour would be required for any large trucks coming into and out of the east side of th9/9/2009 Street Bridge Construction of a new city hall and police station to address energy savings, City Hall/Police Station efficiencies and ADA matters 5/9/2009

Grand Ledge Emergency Services Authority

Oneida Township

Fire Station

8/15/2010

D VE $

8/1/2009

7/15/2010

Funding Request

Route (Infrastructure Only)

t i m

b u S

02262009

Construction of a Fire Sub-station

Submitted Requests - Not Approved

5/9/2009

.34 miles east of M715,000 156

11/9/2009

$

4/10/2009

$

2,500,000

6/10/2009

$

2,000,000

1171 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Grand Ledge District Library City of Grand Ledge City of Grand Ledge City of Grand Ledge City of Grand Ledge City of Grand Ledge City of Grand Ledge City of Grand Ledge City of Grand Ledge City of Grand Ledge

Grand Ledge Grand Ledge Grand Ledge Grand Ledge Grand Ledge Grand Ledge Grand Ledge Grand Ledge Grand Ledge Grand Ledge

Library expansion Ledge Craft Building Senior Center Airport Terminal Ledges Playhouse Police Office COPS Deep well Parking Lot Recycling Center Environmental Clean Up

Expansion of existing facility to gain efficiencies Rehabilitation and energy Rehabilitation and energy Reconstruction and energy Rehabilitation and energy Add a community police officer COPS Add well number 9 to water supply system Additional parking in the Central Business Distric Improve and expand Recycling Center Remediate environmental conditions at the City Dump

City of Grand Ledge City of Grand Ledge City of Grand ledge Iron Mountain Iron Mountain Iron Mountain

Grand Ledge Grand Ledge Grand Ledge Iron Mountain Iron Mountain Iron Mountain

Wastewater Collection System Improvement Environmental Clean up Elevator at Opera House Parking Lot West F St. Lift Station

Eliminate Inflow and Infiltration of ground water into the Sanitary collection system Remediation of underground Storage Tank gasoline leak Install elevator in Opera House Reconstruction of City owned parking lots Reconstruction of water, sewer, storm and road for 3 blocks of West F St. Replacemen of West B St. Lift station

6/9/2009 7/9/2009 6/9/2009 Jun/July Jun/July July/Aug

Iron Mountain

Iron Mountain

East A St.

Repair or replacement of sewer, water and streets for 5 blocks on East A St.

Bellagamba Rd. extension

To extend Bellagamba rd. to HWY US2. Extension of the road will allow better access to a year round resort area of Pine Mountain that has future plans for expansion. The road would be extended through property currently owned by the railroad, negotiations are currently taking place to purchase this property.

Iron Mountain

Iron Mountain

Project Name

t s e

800,000 90,000 250,000 300,000 250,000 90,000 600,000 1,500,000 200,000 500,000

7/4/1905 6/10/2009 8/9/2009 Summer 2009 Summer 2009 Fall 2009

$ $ $ $ $ $

3,000,000 900,000 175,000 700,000 350,000 500,000

July/Aug

Fall 2009

$

900,000

Aug/Sept.

Fall 2009

$

1,300,000

Summer 2010

$

3,500,000 100,000

P P A

O R

D VE

November, 2009

$

Construction of the highest priority new water main throughout sections of the City to loop dead end water mains, increase reliability and fire flow and improve water quality.May, 2009

June, 2010

$

950,000 City wide

Construction of additional new water main throughout sections of the City to loop dead end water mains, increase reliability and fire flow and improve water quality July, 2009

December, 2010

$

872,000 City wide

Water Storage Tank

Construction of a new 400,000 gallon elevated water storage tank for the City water distribution system. The existing tank is very old, is not cost effective to maintain and is severely undersized to provide adequate fire protection or maximum daily water supply to the City. 8/1/2009

December, 2010

$

1,180,000 City Wide

Critical Wastewater Treatment Plant Improvements

Construction of critical upgrades to the City's wastewater treatment facility. The facility is operating well past it's useful life and is in serious need of upgrade or replacement. The critical elements include energy efficiency improvements, green technology through the use of effluent discharge recycle for heating and cooling, electrical and control system improvements, process equipment replacement, structural improvements and the addition of a new sludge storage tank. The project will also include several wind turbines located on the shore of Lake Huron for reducing power demand from the utility company and reducing utility costs. 8/1/2009

7/31/2011

$

3,500,000 City Wide

Iron Mountain

HVAC Upgrades

City of Rogers City

City of Rogers City

Erie Street Water Main

City of Rogers City

City of Rogers City

Water Main Priority Projects

City of Rogers City

City of Rogers City

Water Main Secondary Priority Projects

tt i m

d e t

b u S

02262009

N s

$ $ $ $ $ $ $ $ $ $

$

Iron Mountain

City of Rogers City

T O

4/10/2009 8/9/2009 10/9/2009 9/9/2009 10/9/2009 7/6/1905 7/9/2009 7/9/2009 9/9/2009 5/10/2009

Funding Request

Summer 2009

Frontage Rd.

City of Rogers City

5/9/2009 5/9/2009 5/9/2009 5/9/2009 5/9/2009 3/9/2009 3/9/2009 5/9/2009 5/9/2009 7/9/2009

qu

Iron Mountain

City of Rogers City

Start Date

Route (Infrastructure Only)

To build a frontage road paralleling S. Stephenson Ave. from the Kmart Plaza entrance extending west and connecting with Terminal Drive. This would alleve congestion on South Stephenson and aid in developing vacant and under utilized land.Sept./Oct Replace HVAC systems that are 20 plus years old with newer energy efficient systems Jun/July Construction of new water main on Erie Street between Fourth and Sixth Streets to replace a severely undersized main. May, 2009

Iron Mountain

City of Rogers City

Project Description

Expected Completion Date

e R

Submitted Requests - Not Approved

80,000 Erie Street

1172 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Instead of just performing the critical upgrades listed above to keep the facility operational, this project would do a more complete job for a 20 year service life facility. The same elements as above will apply, with expanded process equipment replacement and upgrades.

City of Rogers City

City of Rogers City

Wastewater Treatment Plant Replacement

City of Rogers City

City of Rogers City

Construction of new sanitary sewer service and sewage pump station to correct Wastewater Collection System Improvemetns existing sewer problems and provide new service to a commercial district.

8/1/2009

7/31/2011

8/1/2009

7/31/2010

City of Rogers City

City of Rogers City

Critical Roadway Improvements

Improvements to the City street system for the high priority projects identified in the City's Street Inventory Study. These are streets identified as failed (rating 1 - 3) and in need of full reconstruction. 8/1/2009

City of Rogers City

City of Rogers City

City Hall Improvements

Improvements to the existing City Hall to include energy efficiency, electrical, HVAC and fire protection improvements, as well as structural and cosmetic repairs.

City of Rogers City City of Rogers City South Redford School District Redford Twp

Expected Completion Date

P P A

O R

8/1/2009

7/31/2011

Funding Request

$

8,400,000 City wide

$

800,000 City wide

$

7,100,000 City wide

D VE

7/31/2010

$

955,600

8/1/2009

7/31/2011

$

3,200,000

6/10/2009

7/30/2009

$

690,000

South Redford Thurston High School

Renovation of the Grambau center to a mixed use community facility to include governmental and public use facilities. Improvements will incude energy efficiency upgrades, ADA compliance, electrical upgrades, plumbing upgrades, HVAC system renovations, window replacements, insulation and structural improvements. Major roof renovation/repair to increase R value and prevent further deterioration of building and damage of contents.

South Redford Thurston High School

Energy efficient lighting upgrades, using cool white LED high efficiency lighting where appropriate, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. Use of appropriate system of renewable energy (PV solar/wind/other) to generate power for use in school building, but to also offer opportunities for high school students to see and learn first hand about these new, green technologies and consider a future in renewable energy technologies. 4/9/2009

6/30/2009

$

650,000

HVAC upgrades and investment in energy efficient system and computerized cnetral control systems to significantly reduce heating and cooling loads and reduce envelope leakage. Use of solar assisted system/wind/geothermal heat pumps to generate energy but to also to offer opportunities for high school students to see and learn first hand about these new technologies and possibly consider a future career in renewabl energy technologies. 5/15/2009

7/30/2009

$

375,000

4/1/2009

4/20/2009

$

180,000

4/9/2009

4/30/2009

$

750,000

Grambau Center Improvements

T O

Route (Infrastructure Only)

N s

South Redford School District Redford Twp

South Redford School District South Redford School District South Redford School District South Redford School District

e t tt

South Redford Thurston High School

Redford Twp

South Redford Thurston High School

Redford Twp

South Redford Thurston High School

South Redford School District Redford Twp

02262009

South Redford - Pierce Middle School

Asphalt replacement in highschool parking area $5/sq ft Interactive boards, projectors, sound systems and other technology upgrades to assist in classroom learing. Major roof renovation/repair to increase R value and prevent further deterioration of building and damage of contents.

6/10/2009

7/30/2009

$

400,000

South Redford - Pierce Middle School

Energy efficient lighting upgrades, using cool white LED high efficiency lighting where appropriate, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. 5/15/2009

6/30/2009

$

250,000

South Redford - Pierce Middle School

HVAC upgrades and investment in energy efficient system and computerized central control system to significantly reduce heating and cooling loads and to identify and reduce envelope leakage. 5/15/2009

6/30/2009

$

175,000

i m

b u S

South Redford School District Redford Twp

u q e

R d

Redford Twp

Redford Twp

t s e

Submitted Requests - Not Approved

1173 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

South Redford School District Redford Twp

South Redford School District Redford Twp

South Redford School District South Redford School District South Redford School District South Redford School District

Project Name

Project Description

Start Date

Expected Completion Date

South Redford - Pierce Middle School

South Redford services a community facing multiple identified student/family risk factors that strongly support the need for a school-based child and adolescent health center to bridge identified health services gaps. Barriers hindering access to appropriate health services include escalating economic disadvantage (42.65%), a highly mobile student population, high percentage of population insured through Medicaid, a shortage of primary health and dental services, and lack of public transportation to primary care facilities. Additional health factors faced by students and community at large include alarming rates of cardiovascular disease and infant mortality, increasing asthma, diabetes and obesity levels in district students, HIV/AIDS prevalence levels that place Redford Twp 5th out of 37 out-Wayne County communities, and an alarming increase in teen birth rate. The center will offer outside access serve students and families. The floor plan will include barrier free access to a reception area and separate waiting room with adequate seating,several private examination/treatment rooms to support medical and dental health services, laboratory4/1/2008

South Redford - Pierce Middle School

50 year old bldg, boys and girls locker rooms need updating to match needs of students. Most of the lockers are broken, rusted out, and/or too small. The space itself has multiple nooks and crannies making heating/cooling highly inefficient. Install heat recovery wheels to address, also remove or partially remove walls to keep room safer and increase energy efficiency. Would also increase number of lockers available for students. 5/15/2009

T O

P P A

O R

N s

Add multi purpose Fitness room to gymnasium. Some of the current locker room space is not used anymore. By reclaiming this space we could add a fitness and aerobic center attached to the current gym. Gymnasiums are used both during and after school for school and community events, we would increase our service potentia for students. For example, current Yoga and Aikido Clubs operate in a hallway adn the choir room since the gym is not available. A new multi-purpose fitness room will accomodate these clubs to create optimal settings. While some districts are cutting physical education courses, we are expanding them! All of our students have at least one semester of PE now. This request fits with our goals and objectives toward educating the whole child, not just academics. 6/15/2009 Renovate student restroom to upgrade with low flow sensor faucets/water saving toilets and make ADA compliant. 3/1/2009 Renovate teacher restroom to make ADA compliant, and to upgrade to low flow sensor faucets/water saving toilets. 3/1/2009 Interactive boards, projectors, sound systems and other technology upgrades to assist in classroom learing. 4/9/2009 South Redford has two available elementary school buildings-either could be immediately ready for renovation to accommodate an Early Childhood Center. Our community demographics are changing and the need for a strong preschool program has become evident. We recognize the importance of providing families with the resources and opportunities to give their child the early school experiences that they will need for later success. We envision a program that both staff and community members can use from birth through Kindergarten age students. This program would embrace collaborative relationships between staff, families and community partnerships. Opportunities for children will be rich with experiences that will meet thei developmental needs. This program would truly provide children with consistent experiences leading to future school success. The bldg was built in 1952, and the HVAC system needs complete replacement to high efficiency multiple boiler system and bldg requires multiple upgrades to evelope system - roof replacement, windows and doors, etc. High performance lighting upgrades, technology upgrades are also ne

Funding Request

Route (Infrastructure Only)

D VE

8/10/2009

$

750,000

6/30/2009

$

344,165

8/15/2009

$

116,301

3/30/2009

$

75,000

3/30/2009

$

25,000

4/30/2009

$

600,000

9/1/2009

$

7,000,000

t s e

Redford Twp

South Redford - Pierce Middle School

Redford Twp

South Redford - Pierce Middle School

Redford Twp

South Redford - Pierce Middle School

Redford Twp

South Redford - Pierce Middle School

b u S South Redford School District Redford Twp

02262009

R d

e t t

t i m

u q e

3/1/2009

South Redford - Gibson

Submitted Requests - Not Approved

1174 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency South Redford School District Redford Twp

South Redford - Addams Elementary

Project Description Start Date Major roof renovation/repair to increase R value and prevent deterioration of building and damage of contents. 6/10/2009

7/30/2009

South Redford - Addams Elementary

Energy efficient lighting upgrades, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. 5/15/2009

6/30/2009

South Redford - Addams Elementary

HVAC upgrades and investment in energy efficient system and computerized central control system to significantly reduce heating and cooling loads and to identify and reduce envelope leakage. 5/15/2009

6/30/2009

South Redford - Addams Elementary

The South Redford School District is committed to providing community groups a place to meet and provide activities at no cost to our parents. Presently we are unable to meet these community needs. In an area with a rapidly growing economically deprived population, we need to provide opportunities for our students to be engaged in positive activities with positive role models. A multipurpose room would also provide an area for before and after school child care in every child’s neighborhood. 6/10/2009

Redford Twp

South Redford - Addams Elementary

Creating an addition to the school for the purpose of adding space designed for science instruction to include technology and science equipment would provide a space for enhanced learning experiences for our elementary students. A dedicated science room could provide access to equipment, materials, and technology that would be too expensive to have in every classroom. This request would be for construction of new space and equipment for use by students to provide quality science instruction and enhance learning through hand-on experiences. We currently have a partnership with Detroit Diesel, a manufacturing plant. Engineers work with teachers and students in grades 3 and 5 to support student learning of physical science principals through hands-on experiments using a program called World in Motion. The students can be seen using the gym or the hall way to run experiments. It would be great to have a science room for such a purpose. 6/10/2009

Redford Twp

South Redford - Addams Elementary

Redford Twp

South Redford - Addams Elementary

Redford Twp

South Redford - Fisher Elementary

South Redford School District Redford Twp South Redford School District Redford Twp

South Redford School District Redford Twp

Project Name

Expected Completion Date

T O

$

250,000

D VE $

125,000

$

145,000

8/30/2009

$

1,750,000

8/30/2009

$

560,000

4/24/2009

$

25,000

4/30/2009

$

250,000

O R

P P A

Funding Request

Route (Infrastructure Only)

N s

South Redford School District South Redford School District South Redford School District South Redford School District

South Redford School District Redford Twp South Redford School District Redford Twp

02262009

u q e

Restroom and other ADA upgrades 4/9/2009 Interactive boards, projectors, sound systems and other technology upgrades to assist in classroom learing. 4/9/2009 Major roof renovation/repair to increase R value and prevent deterioration of building and damage of contents. 6/10/2009

R d

7/30/2009

$

250,000

Energy efficient lighting upgrades, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. 5/15/2009

6/30/2009

$

225,000

South Redford - Fisher Elementary

HVAC upgrades and investment in energy efficient system and computerized central control system to significantly reduce heating and cooling loads and to identify and reduce envelope leakage. 5/15/2009

6/30/2009

$

175,000

South Redford - Fisher Elementary

The South Redford School District is committed to providing community groups a place to meet and provide activities at no cost to our parents. Presently we are unable to meet these community needs. In an area with a rapidly growing economically deprived population, we need to provide opportunities for our students to be engaged in positive activities with positive role models. A multipurpose room would also provide an area for before and after school child care in every child’s neighborhood. 6/10/2009

8/30/2009

$

1,750,000

e t tt

i m

South Redford - Fisher Elementary

b u S

South Redford School District Redford Twp

t s e

Submitted Requests - Not Approved

1175 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

South Redford School District Redford Twp South Redford School District Redford Twp South Redford School District Redford Twp

South Redford School District Redford Twp South Redford School District Redford Twp

South Redford School District Redford Twp

Project Name

Project Description

South Redford - Fisher Elementary South Redford - Fisher Elementary

Start Date

Expected Completion Date

Creating an addition to the school for the purpose of adding space designed for science instruction to include technology and science equipment would provide a space for enhanced learning experiences for our elementary students. A dedicated science room could provide access to equipment, materials, and technology that would be too expensive to have in every classroom. This request would be for construction of new space and equipment for use by students to provide quality science instruction and enhance learning through hand-on experiences. We currently have a partnership with Detroit Diesel, a manufacturing plant. Engineers work with teachers and students in grades 3 and 5 to support student learning of physical science principals through hands-on experiments using a program called World in Motion. The students can be seen using the gym or the hall way to run experiments. It would be great to have a science room for such a purpose. 6/10/2009

PP

O R

Funding Request

D VE

8/30/2009

$

560,000

4/9/2009

4/24/2009

$

25,000

4/9/2009

A T

South Redford - Fisher Elementary

Restroom and other ADA upgrades Interactive boards, projectors, sound systems and other technology upgrades to assist in classroom learing.

4/30/2009

$

400,000

South Redford - Jefferson Elementary

Energy efficient lighting upgrades, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. 5/15/2009

6/30/2009

$

150,000

South Redford - Jefferson Elementary

HVAC upgrades and investment in energy efficient system and computerized central control system to significantly reduce heating and cooling loads and to identify and reduce envelope leakage. 5/15/2009

6/30/2009

$

100,000

South Redford - Jefferson Elementary

The South Redford School District is committed to providing community groups a place to meet and provide activities at no cost to our parents. Presently we are unable to meet these community needs. In an area with a rapidly growing economically deprived population, we need to provide opportunities for our students to be engaged in positive activities with positive role models. A multipurpose room would also provide an area for before and after school child care in every child’s neighborhood. 6/10/2009

8/30/2009

$

1,750,000

8/30/2009

$

560,000

7/30/2009

$

250,000

4/9/2009

4/24/2009

$

25,000

4/9/2009

4/30/2009

$

300,000

s

t s e

O N

u q e

Route (Infrastructure Only)

R d

South Redford School District South Redford School District South Redford School District South Redford School District

e t tt

i m

b u S

Redford Twp

South Redford - Jefferson Elementary

Redford Twp

South Redford - Jefferson Elementary

Redford Twp

South Redford - Jefferson Elementary

Redford Twp

South Redford - Jefferson Elementary

02262009

Creating an addition to the school for the purpose of adding space designed for science instruction to include technology and science equipment would provide a space for enhanced learning experiences for our elementary students. A dedicated science room could provide access to equipment, materials, and technology that would be too expensive to have in every classroom. This request would be for construction of new space and equipment for use by students to provide quality science instruction and enhance learning through hand-on experiences. We currently have a partnership with Detroit Diesel, a manufacturing plant. Engineers work with teachers and students in grades 3 and 5 to support student learning of physical science principals through hands-on experiments using a program called World in Motion. The students can be seen using the gym or the hall way to run experiments. It would be great to have a science room for such a purpose. 6/10/2009 Major roof renovation/repair to increase R value and prevent further deterioration of building and damage of contents. 6/10/2009

Restroom and other ADA upgrades Interactive boards, projectors, sound systems and other technology upgrades to assist in classroom learing.

Submitted Requests - Not Approved

1176 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

South Redford School District Redford Twp

Project Name

Project Description

South Redford - Vandenberg Elementary

Start Date

Expected Completion Date

Energy efficient lighting upgrades, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. 5/15/2009

6/30/2009

Funding Request

$

175,000

$

150,000

$

250,000

8/30/2009

$

1,750,000

8/30/2009

$

560,000

4/9/2009

4/24/2009

$

25,000

3/1/2009

3/30/2009

$

25,000

D VE

South Redford - Vandenberg Elementary

HVAC upgrades and investment in energy efficient system and computerized central control system to significantly reduce heating and cooling loads and to identify and reduce envelope leakage. 5/15/2009 Major roof renovation/repair to increase R value and prevent further deterioration of building and damage of contents. 6/10/2009

South Redford - Vandenberg Elementary

The South Redford School District is committed to providing community groups a place to meet and provide activities at no cost to our parents. Presently we are unable to meet these community needs. In an area with a rapidly growing economically deprived population, we need to provide opportunities for our students to be engaged in positive activities with positive role models. A multipurpose room would also provide an area for before and after school child care in every child’s neighborhood. 6/10/2009

Redford Twp

South Redford - Vandenberg Elementary

Creating an addition to the school for the purpose of adding space designed for science instruction to include technology and science equipment would provide a space for enhanced learning experiences for our elementary students. A dedicated science room could provide access to equipment, materials, and technology that would be too expensive to have in every classroom. This request would be for construction of new space and equipment for use by students to provide quality science instruction and enhance learning through hand-on experiences. We currently have a partnership with Detroit Diesel, a manufacturing plant. Engineers work with teachers and students in grades 3 and 5 to support student learning of physical science principals through hands-on experiments using a program called World in Motion. The students can be seen using the gym or the hall way to run experiments. It would be great to have a science room for such a purpose. 6/10/2009

Redford Twp

South Redford - Vandenberg Elementary

Redford Twp

South Redford - Vandenberg Elementary

Redford Twp

South Redford - Vandenberg Elementary

Restroom and other ADA upgrades Renovate teacher restroom to make ADA compliant, and to upgrade to low flow sensor faucets/water saving toilets. Interactive boards, projectors, sound systems and other technology upgrades to assist in classroom learing.

4/9/2009

4/30/2009

$

350,000

South Redford - Shear

Security upgrades to doors/hardware, security cameras, two way communiciation at entry door, buzzer system to allow entry into bldg to ensure safety of students and staff.

3/1/2009

3/30/2009

$

25,000

Restroom and other ADA upgrades

5/15/2009

6/30/2009

$

15,000

South Redford - Ashcroft

1950's boiler replacement to new high efficiency boiler/hvac system

4/1/2009

4/30/2009

$

200,000

South Redford - Ashcroft

Energy efficient lighting upgrades, use of photo/occupancy sensors to control usage, and installation of a centralized control system to identify peak demand and allow control of load to reduce consumption, and also to operate normal operations in the most energy efficient manner possible. 3/1/2009

3/30/2009

$

100,000

South Redford - Ashcroft

Restroom and other ADA upgrades

3/30/2009

$

50,000

South Redford School District Redford Twp South Redford School District Redford Twp

South Redford School District Redford Twp

South Redford - Vandenberg Elementary

T O

6/30/2009 7/30/2009

P P A

O R

Route (Infrastructure Only)

N s

South Redford School District South Redford School District South Redford School District South Redford School District

South Redford School District Redford Twp South Redford School District Redford Twp South Redford School District Redford Twp

i m

b u S

South Redford School District Redford Twp South Redford School District Redford Twp

02262009

u q e

R d

e t tt

South Redford - Shear

t s e

Submitted Requests - Not Approved

3/1/2009

1177 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Escanaba Area Public Schools City of Escanaba Coopresville Area Public Schools Coopresville Area Public Schools Coopresville Area Public Schools Coopresville Area Public Schools Coopresville Area Public Schools Coopresville Area Public Schools

Project Name

Escanaba Area Public Schools- Elementary Schools

Coopersville, MI

Coopresville Area Public Schools

Coopersville, MI

Coopresville Area Public Schools

Coopersville, MI

Coopresville Area Public Schools

Coopersville, MI

Coopresville Area Public Schools

Coopersville, MI

Coopresville Area Public Schools

Coopersville, MI

Coopresville Area Public Schools

Mount Pleasant Public Schools Union Township Mount Pleasant Public Schools Union Township

u S

Mount Pleasant Public Schools Union Township Mount Pleasant Public Schools City of Mount Pleasant Mount Pleasant Public Schools City of Mount Pleasant Mount Pleasant Public Schools Union Township

02262009

Project Description

itt

d e t

Leed (Leadership in Energy and Environmental Design) Certified Project Architect Diekema Hamann Construction Wolgast Corporation Additional Classroom space for students, New roof, decking and insulation, Remove asbestos based floor tiles and ceiling and replace, Upgrade classrooms for receiving technology, Replace all lighting with energy efficient units, Redesign parking and drives for student safety Replace all doors and hardware, Replace and install energy efficient window units, Improve assessibility for students with with disabilities, Install air handlers for indoor air quality, New classroom furniture to mee the needs for changes in curriculum, Replace toliert, sink, and plumbing with energy efficient units

O R

T O

-N

D VE

120 days after notification of Funding

3/10/2009

$

7,000,000

10/1/2009

$

900,000

2/1/2010

$

275,000

2/1/2010

$

325,000

10/1/2009

$

275,000

8/1/2010

$

175,000

10/1/2009

12/1/2010

$

450,000

SCHOOLS / Replace the carpet In the classroom and building that is over 7 years old 6/20/2010

7/20/2010

$

160,000

7/1/2009

8/15/2009

$

75,000

6/20/2009

7/20/2009

$

6,000

6/20/2009

8/15/2009

$

20,000

6/20/2009

7/20/2009

$

10,000

SCHOOLS / Replace the carpet In the classroom and building that is over 7 years old 6/20/2010

7/20/2010

$

6,000

s t s

e u

Elementary Playground Drainage and Surfacing Remove existing surfacing to provide drainage and replace with handicapped accessible solid surface safety play surface 6/1/2009 Maintenance Storage Building Install stand alone maintenance storage building with electric, sewer, water and natural gas 3/1/2010

Bus Replacement Replace buses @ 4 per year

bm

Mt. Pleasant Public Schools - West Intermediate School - Wood Shop ventilation SCHOOLS / Replace ventilation in wood shop

Mt. Pleasant Public Schools - West Intermediate School - Roof seal and flashing SCHOOLS / Replace seal and flashing on roof Mount Pleasant Public Schools - High School AHU Compressor Replacement SCHOOLS / replace AHU compressor at High School Mt. Pleasant Public Schools - High School Roof seal and flashing SCHOOLS / Replace seal and flashing on roof

Mount Pleasant Public Schools, Community Education School, Carpet Replacement

Funding Request

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

Parking lot and raod repairs Repair cracks, potholes. Sawcut and remove bituminous pavement as needed. Butt joint connection. 2" leveling course of HMA mix 3C & 1.5' surface course of HMA mix 4C. 4/1/2009 Elementary Classroom Upgrades Supply sinks and water to newly renovated elementary classrooms 6/1/2009 Elementary Media Center Renovation Renovate existing media center to provide two elementary classrooms and technology infrastructure 6/1/2009

q e R

Mt. Pleasant Public Schools - West Intermediate School - Carpet Replacement

Start Date

Expected Completion Date

1178 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Mount Pleasant Public Schools Mount Pleasant Public Schools Mount Pleasant Public Schools Mount Pleasant Public Schools

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

City of Mount Pleasant

Mount Pleasant Public Schools, Community Education School, Roof Replacement Mount Pleasant Public Schools - Oasis Alt HS Computer replacement Mount Pleasant Public Schools - Light Fixture replacement Mount Pleasant Public Schools - motion detectors for lights

Sanford, Michigan, Jerome Township

This site project involves the complete grinding of the existing ashpalt, base restoration and regrading, 3" new ashpalt, and repainting of the high school parking lo and service drives. This parking lot is badly in need of replacement. It is a safety 6/9/2009 Meridian Public Schools- Meridian High Schoolhazard as there are many potholes and loose pieces of ashpalt.

Meridian Public Schools Meridian Public Schools

Sanford, Michigan, Jerome Township Sanford, Michigan, Jerome Township

This site project involves the complete grinding of the existing ashpalt, base restoration and regrading, 3" new ashpalt, and repainting of the parking lot. This Meridian Public Schools- Meridian Early parking lot is badly in need of replacement. It is a safety hazared with potholes and Childhood Center loose ashpalt. 6/9/2009 Meridian Public Schools-Meridian Elementary Replacement of very old, worn out classroom carpeting throughout the building. Must School also include the abatement of asbestos tile under carpet. 6/9/2009

Meridian Public Schools Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools

Sanford, Michigan, Jerome Township

Meridian Public Schools-Meridian Jr. High School

Sandusky

New PA system for High School

Sandusky

Sandusky Community Schools Sandusky Community Schools - Sandusky High School Sandusky Community Schools - Sandusky Middle School

New PA system for Middle School

6/1/2009

9/1/2009

$

70,000

Sandusky

Sandusky Community Schools

Parking lot repairs at all buildings

6/1/2009

9/1/2009

$

522,000

Roof replacement at the High School and Middle School

7/1/2009

9/1/2009

$

1,310,000

Climate control unies for High School and Middle School

5/1/2009

6/1/2009

$

43,000

Heating unit repairs at Maple Valley Elementary

6/1/2009

8/1/2009

$

96,000

Replace storage shed

5/1/2009

7/1/2009

$

60,000

Boiler replacement

7/1/2009

9/1/2009

$

360,000

Playground repair and replacement

7/1/2009

9/1/2009

$

262,000

Facia repair

7/1/2009

9/1/2009

$

62,000

Parking lot light repair

6/1/2009

9/1/2009

$

22,000

Meridian Public Schools

Union Township Union Township City of Mount Pleasant

Sandusky Community Schools - Sandusky High School and Middle School

Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools Sandusky Community Schools

Sandusky Community Schools - Sandusky High School and Middle School Sandusky Community Schools - Maple Valley Elementary Sandusky Community Schools - Maple Valley Elementary Sandusky Community Schools - Sandusky High School

Sandusky

m b u

Sandusky Sandusky

02262009

e t t

it

Sandusky

Sandusky

7/20/2009

SCHOOLS / Replace computers at Alternative High School

6/20/2009

8/1/2009

SCHOOLS / Replace old light fixtures with new energy efficient light fixtures

6/20/2009

6/20/2010

SCHOOLS / Install motion detectors on all lights in the district

6/20/2009

6/20/2009

S

st

e u

eq

s

Sandusky Community Schools Sandusky Community Schools - Sandusky Middle School Sandusky Community Schools - Sandusky High School

80,000

D VE

150,000

$

20,000

$

150,000

7/9/2009

$

90,000

7/9/2009

$

60,000

7/9/2009

$

50,000

6/9/2009

$

30,000

9/1/2009

$

470,000

6/1/2009

9/1/2009

$

70,000

O R

PP

O N

Submitted Requests - Not Approved

$ $

Replacement and repair to existing central air conditioning system. System was installed in 2000 and two of the main compressors have been broken for two years. Cost for repair has been beyond the scope of the current maintenance budget. 6/9/2009 Networking and phone cabling for all buildings; Wireless networking for all buildings; New Server setup for data and phone. 6/1/2009

R d

Sandusky Community Schools Sandusky

Sandusky

6/20/2009

A T

Sandusky

Sandusky

SCHOOLS / Replace roof that is over 10 years old and not energy efficient

Route (Infrastructure Only)

1179 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

New Power Tour, Inc. 501c3 Laurium, MI

Copper Country Wieatherization

Bruce Township

Bruce Township

33 Mile Water Main

Bruce Township

Bruce Township

33 Mile ingress and egress ramps

New Power Tour's mission is to increase the use of renewable and energy efficiency technologies. In the past year, NPT has delivered 25+ talks on bioenergy. For energy efficiency, funded through a local bank, recently initiated a local program to increase the energy efficiency of the homes of our rural elderly residents on fixed incomes. We pair at-risk high schoolers with both students from Michigan Tech University's ETEC (Efficiency Through Engineering Construction) Enterprise as well as retired (handy) Kiwanis club volunteers to tighten up and seal the homes of people who can least afford their heating bills. Two area contractors visit the site (on a volunteer basis) when it is completed and sign off on the job. We seek to amplify this program by pairing students with licensed contractors to: insulate attics with loose-fill cellulose insulation; insulate and caulk rim joists with rigid and foam insulation; caulk and seal foundations, windows, doors and baseboard trim; insulate hot water heater and lines; as well as minor weatherization and energy efficiency improvements that make a fisca7/1/2009 33 Mile water main to provide Detroit water to the industrial district located between McKay and Powell roads on 33 Mile 5/1/2009 Construction of two on/off ramps providing accessibility to the industrial district via M53. 5/1/2009

Downtown Development Authority Streetscape/N. Saginaw St. Reconstruction

In 2005, the City of Durand was successful in gaining federal grant assistance and an MDOT grant to complete Phase I of the Downtown Development Authority Streetscape and reconstruction of 4 blocks of Main Street, the key roadway that leads through the ci 6/1/2009

Econ. Dev./Flood Control & Upgrades

To meet requirements outlined in the City's administrative consent order with MIDEQ, the city must install a storm sewer system including retention pond to address storm water infiltration into the sewer system. This project will correct stormwater and f 6/1/2009

Energizing City Hall

O R

PP

Funding Request

Route (Infrastructure Only)

D VE

7/1/2011

$

352,150

8/1/2009

$

623,365

8/1/2009

$

6,500,000

9/30/2009

$

10/31/2009

$

1,750,000 local

The City Hall in Durand, Michigan is seat for local municipal government. All local government operations are housed at City Hall and all city government meetings are held within its walls. It is also the central gathering locations for many civic organ 9/1/2009

10/31/2009

$

400,000 n/a

A private developer began construction of a new subdivision within the city in 2002. Several homes were built in Phase I of the subdivision and the first street was constructed. Eventually, the developer lost the project and the second street was never

5/1/2010

9/30/2010

$

400,000 local

8184 North 6th St., Kalamazoo, MI 49009

Immediately

$

14,000

Otsego - High School

550 Washington Street, Otsego, MI 49078

Immediately

$

10,000

Otsego- Athletic Complex

550 Washington Street, Otsego, MI 49078

Immediately

$

35,000

Install new variable speed Otsego Public Schools motors on 3 boilers Otsego - Washington Street Elementary

538 Washington Street, Otsego, MI 49078

Immediately

$

12,000

Otsego Public Schools Resurface gym flooring

540 Washington Street, Otsego, MI 49078

Immediately

$

25,000

City of Durand

City of Durand

City of Durand

City of Durand

City of Durand, MI

Durand, MI

City of Durand, MI

Durand, MI

d e t

Replace lighting in Media Center, Gym and Halls to Otsego Public Schools create energy efficiences. Otsego - Alamo Elementary

itt

q e R

s

st

e u

Housing Development Stimulus

New Auditorium Stage Otsego Public Schools Flooring - Dance

A T

O N

m b u

New Fencing at various locations on athletic Otsego Public Schools complex

S

02262009

Otsego - Middle School

Submitted Requests - Not Approved

700,000 Major

1180 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Otsego Public Schools Replace gym lighting

Replace Auditorium Otsego Public Schools Lighting

Additional Security Otsego Public Schools Cameras

Otsego Public Schools Replace Roof

Project Name

Project Description

Otsego Public Schools New Storage Facility

Otsego - Washington Street Elementary

Immediately

$

20,000

Otsego - Middle School

540 Washington Street, Otsego, MI 49078

Immediately

$

28,000

Otsego - High School

550 Washington Street, Otsego, MI 49078

Immediately

$

12,000

540 Washington Street, Otsego, MI 49078

Immediately

$

500,000

538 Washington Street, Otsego, MI 49078

Immediately

$

500,000

8184 North 6th Street, Kalamazoo, MI 49078

Immediately

$

100,000

560 Washington Street, Otsego, MI 49078

Immediately

$

70,000

570 Washington Street, Otsego, MI 49078

Immediately

$

200,000

9/30/2009

$

800,000

4/30/2009

$

5,800,000

11/1/2009

$

500,000

12/31/2009

$

4,740,000

12/31/2009

$

5,260,000

9/30/2009

$

472,000

10/31/2009

$

559,893

8/31/2009

$

7,630,000

O R

T O

eq

ub

Detroit Saginaw

Kenquest House

S

St. Thomas Moore School Holy Cross School

Thomas McGivney School

Saginaw

St. Vincent Home

Clinton

Clinton Campus

02262009

R d

e t tt

Samaritan Center

Grayling Clinton

Queen of Angels School

st

e u

Otsego - Maintenance

i m

Detroit

N s

Otsego - Alamo

New Environmental Study Otsego Public Schools Area - Science Otsego - Environmental

Holy Cross Children's Services Saginaw/Spaulding

Funding Request

538 Washington Street, Otsego, MI 49078

Otsego - Washington Street Elementary

Replace HVAC Unit Otsego Public Schools Ventilators

Holy Cross Children's Services Holy Cross Children's Services Holy Cross Children's Services Holy Cross Children's Services Holy Cross Children's Services Holy Cross Children's Services Holy Cross Children's Services

Start Date

Otsego - Middle School

Otsego Public Schools Replace Roof

Expected Completion Date

P P A

Addition of a gymnasium and classrooms to the Queen of Angels campus in Saginaw serving approximately 65 males. These youth are in residential treatment at this campus and are currently bussed to another site for education. The campus has no indoor recreational capabilities at this time. 4/1/2009 Construction of a Health and Wellness Center on the campus of Samaritan Center in Detroit, including a dental clinic serving children and adults, a gymnasium and indoor track for neighborhood residents and for ThinkDetroit/PAL, and multipurpose rooms for community use. Samaritan Center serves 40,000 residents each month. 5/1/2009 Addition of bedrooms, living space, bathrooms and day care to group home for pregnant/parenting teens 5/1/2009 Renovations and upgrades to St. Thomas Moore School on the Boysville campus in Clinton, serving approximately 125 youth. 7/1/2009 Renovations and upgrades to Holy Cross School in northwest Detroit, serving approximately 75 youth 7/1/2009 Reonvations and upgrades to Thomas McGivney School in Saginaw, serving approximately 65 youth 7/1/2009 Renovations, repairs and upgrades to St. Vincent Home identified in 2008 Smith Group study, serving approximately 65 youth and 24 infants 7/1/2009 Renovations, repairs and upgrades to Clinton Campus identified in 2008 Smith Group Study, serving approximately 150 youth 9/1/2009

Submitted Requests - Not Approved

D VE

Route (Infrastructure Only)

1181 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Holy Cross Children's Services Mt. Morris Holy Cross Children's Services Detroit Holy Cross Children's Services Monroe

Project Name

Project Description Start Date Renovations, repairs and upgrades to Corcoran House identified in 2008 Smith Group Study, serving approximately 50 youth 6/1/2009 Renovations, repairs and upgrades to St. Thomas House identified in 2008 Smith Group Study, serving approximately 30 youth 5/1/2009 Renovations, repairs and upgrades to Moreau Center identified in 2008 Smith Group Study, serving approximately 70 youth 5/1/2009

Corcoran House St. Thomas Home Moreau Center

555 Nonprofit Gallery and Studios, established in 2002, is a volunteer-run arts organization. 555 consists of a diverse and dedicated group of artists and patrons providing resources to emerging and established artists and cultivating support and educating the community through exhibitions, performances, studios, educational programs, and new strategies for sustainable arts space development by collaborating and partnering with local businesses, nonprofit community organizations arts organizations, and schools.

Berkley School District Oak Park, MI

555 will be directing the development of the fully sustainable energy efficient multi-me 6/9/2009

Berkley School District. All District buildings

District wide energy conservation project. Improvements will include lighting system upgrades w/ T8 fixtures and occupancy sensors, building automation system installation and upgrades to controls, boiler replacements, steam trap replacement, building envelope improvements by replacing roofs and windows & water conservation measures. Project will provide a reduction of $340,000 per year in energy costs and significant reduction in greenhouse gas emissions. 3/1/2009

t i m

ub

Across Michigan

-N

555 Nonprofit Gallery/Studios

d e tt

Blue Harbor Energy

T O

SmartEnergy Michigan

s t s

e u

q e R

Funding Request

8/31/2009

$

102,650

8/31/2009

$

571,650

$

2,850,000

12/1/2009

$

3,908,370

4/11/2009

$

3,750,000,000

11/30/2009

O R

D VE

Route (Infrastructure Only)

P P A

In collaboration with Detroit's nonprofit Art Center Music School, established in 1922, 555 will be rehabilitating and greening their historic facility. The original structure built in 1891 was a residence designed by architect Almon Varney in the Queen Anne Style. In 1916, it was sold to the W. Hamilton Funeral Company, adding a mortuary chapel in an Egyptian Revival vein of the Art Deco. ACMS took ownership of the buildings in 1980 but suspended operations in 2007 due to overwhelming costs and is now in disrepair. 555 Nonprofit Gallery and Studios

Expected Completion Date

The SmartEnergy Michigan Consortium will target the top 50 non-utility energy users in Michigan for energy savings audits and calculates energy savings that will be financed by private investors. The anticipated yearly savings to Michigan’s businesses is projected to be 1750 MW (enough to power 1.7 million homes) with a direct and corresponding reduction in greenhouse gas emissions or a $1.3B/year reduction of energy dollars (of which a considerable proportion is sent outside the state), thereby making Michigan industry $1.3 B more profitable in a time of economic crisis. From 2009-2011, SmartEnergy Michigan will conduct energy audits at the Michigan steel, aluminum, industrial, auto, manufacturing and chemical sectors to define the top 50 users of energy in Michigan. The result of the audits will be plans that will increase the adoption of cutting edge technologies and best practices for improvement of energy efficiency, environmental performance and reduced costs with special regard for community use of previously wasted energy. Where possible, the use of Waste to Energy (WTE) technologies will be used for power generation. Youngstown Energy is 4/9/2009

12/10/2009

S 02262009

Submitted Requests - Not Approved

1182 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Branch County

Branch County

Coldwater Township

Coldwater Township

Project Name

Project Description

Start Date

Jail Update-Plumbing & Electrical

The project will consist of updating the electrical and plumbing systems at the Branch County Jail. Most of the current electrical system is original with the building that was built in 1959. The electrical update would consist of new electrical panels, new electrical lines ran if needed, new receptacles and installing new energy efficient lighting. The plumbing update will involve installing all new stainless steel sink/toilet combinations throughout the facility. Some new waterlines will have to be installed along with some pipe chases. The sink/toilet combinations will use less water and help the environment. In addition, the plumbing project will consist of installing two new energy efficient hot water heater boilers. We believe the electrical and plumbing updates made to the Branch County Jail will improve energy costs and lessing our impact on the local environment. 5/1/2009

Integration with State Correctional Facilities

The project will consist of modifying existing State Coorectional Facilities that are scheduled for closure (Camp Branch). The modifications would allow for medium and maximum holding, intake and processing, and operational support. Existing state trained staff will be released upon closure and this transition would allow for displaced state personnel to transition to the county corrections program. The intent is to enter into a lease agreement with the state to continue the use of these facilities. 6/1/2009

T O

O R

1,000,000

6/1/2010

$

1,500,000

4/1/2009

12/1/2009

$

800,000

8/1/2009

$

250,000

Branch County

Coldwater/Coldwater

County Development

Branch County

Coldwater Twp.

Building Efficiencies

Improve effeciences of building with lighting, upgrades that decrease energy use.

4/1/2009

Branch County Opera House

517-278-6029

Tibbits Opera House Restoration

Events Improvement

Construction of seating for events at the county fairgrounds which would allow for increased capacity and income coming into the county. This construction would allow for more events that attract people and revenue into the county. 4/1/2009 Renovate an old building which was donated to CHC. The renovated building will house several clinical and support services, e.g., Oncology Center, Physician practices, etc., and allow other services to be moved from the hospital proper allowing for additional in-house growth. 2/9/2009

Route (Infrastructure Only)

D VE $

P P A

-N

Funding Request

1/1/2010

Develop parking and greenspace areas that provides for planned growth in jobs in county courthouse area. This would improve the parking, provide dedicated greenspace, and allow for the expanision of job opportunities.

s t s

Expected Completion Date

$

Michigan Historic Preservation 9,000,000 Network

8/1/2009

$

1,500,000

Sep/Oct 2009

$

3,100,000

Provides for renovation and building of additional structures to accommodate current patient treatment protocols and additional services; also, allows old, antiquated facilities to be brought up to current code and allows the hospital to become a competitive in many areas which are presently loosing utilization and occupancy. 7/2/1905

7/5/1905

$

28,000,000

AIRPORT ADMINIS. BLDG.

3.000 SQUARE FT AIRPORT ADMINISTRATION BLDG. TO REPLACE 75 YEAR OLD BLDG WHICH IS ENERGY INEFICIENT. NEW BUILDING WILL BE VERY ENERGY EFFICIENT WITH GEOTHERMAL HEATING, ENERGY EFFICIENT WINDOWS, & LIGHTING.

5/1/2009

7/31/2009

$

450,000

Branch County Commission on Aging Coldwater/Coldwater

Ballast Change/Ligtht Staging

Change Ballasts to more efficient lighting and staging of lights to reduce the number on lights controlled by each off & on switch; installation of sensor switches

1/1/2009

12/30/2009

$

10,000

Branch County Commission on Aging Coldwater/Coldwater

Ballast Change/Ligtht Staging

Change Ballasts to more efficient lighting and staging of lights to reduce the number on lights controlled by each off & on switch; installation of sensor switches

1/1/2009

12/30/2009

$

10,000

Branch County Commission on Aging Coldwater/Coldwater

Roof- Water Infiltration prevention

Roof overlay with white membrane over isocyanurate insulation with cover board. Roof Sumps, drains

5/1/2009

11/1/2009

$

164,230

Branch County

Branch County

Branch County

Branch County

[email protected]

Coldwater

Coldwater, MI

K-Mart Renovation

Coldwater, MI

itt

d e t

Hospital Addition / Renovation

m b u

Branch County Airport Commission COLDWATER TWP

S

02262009

q e R

e u

Submitted Requests - Not Approved

1183 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Branch County Commission on Aging Coldwater/Coldwater

Walls - Water Infiltration prevention

Walls: Tuckpointing, power washing and elastromeric waterproofing coating

5/1/2009

11/1/2009

Branch County Commission on Aging Coldwater/Coldwater

Doors and Windows - Water Infiltration prevention

Doors and Windows: removal/re-install;grind,prime and paint lintels; material transition sealant 5/1/2009

11/1/2009

Coping, Fascia and Soffit- Water Infiltration prevention

Coping, Fascia and Soffit: Replace pre-finished metal coping with galvanized continuous hold down clip and steel coping cover or aluminum coping material transitiion sealant between all dissimilar materials

5/1/2009

11/1/2009

Coldwater/Coldwater

Electronic Hard Water Treatment Systme

Installation of an electronic Hard Water System to replace traditional current salt treatment water softener system

Once approved

Countywide

County Wide Chip Seal

Chip Seal 150 miles of Branch County Primary roads

6/1/2009

Sherwood Twp.

Babcock Rd. (Division - Girard)

2.5 miles of Rehabilitation

Bronson Twp.

Burr Oak Rd. (City Line - Osborn)

2.42 miles of Rehabilitation

Sherwood Twp.

Girard Rd. (Dunks-Babcock)

1.85 miles of Rehabilitation

Batavia Twp.

N Snow Prairie Rd. (US12-M86)

2.9 miles of Rehabilitation

Girard Twp. California & Algansee Twps.

Union City Rd. (Jonesville-River)

2.93 miles of Rehabilitation

Ray Quincy (Copeland-Lester)

2.02 miles of Rehabilitation

California Twp.

Copeland Rd. (Fremont - Ray Quincy)

2.5 miles of Rehabilitation

Quincy Twp.

3.61 miles of Rehabilitation

Calfiornia Twp.

Fremont Rd. (Corless-US12) Southern Rd. (Ray Quincy-Hillsdale County Line)

Butler Twp.

Clarendon Rd. (Litchfield-Calhoun Co. Line)

Union Twp.

Burlington Rd. (Union City-County Line)

Algansee Twp.

Grove Rd. (Ray Quincy-Hillsdale Co. Line) 2.89 miles of Rehabilitation Resurface 341 miles of Branch County Gravel Roads Resurface

Branch County Commission on Aging Coldwater/Coldwater Branch County Commission on Aging Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission Branch County Road Commission

it

Countwide

m b u

Ovid Twp. Coldwater Twp. Ovid Twp.

S

Algansee Twp. Union Twp.

$

47,975

D VE $

22,210

$

25,730

Once Approved

$

3,299

7/15/2009

$

1,800,000 Branch County

5/3/2009

5/29/2009

$

875,000 Babcock Rd.

6/1/2009

6/12/2009

$

850,000 Burr Oak Rd.

6/15/2009

6/24/2009

$

6/25/2009

7/10/2009

$

650,000 Girard Rd. N Snow Prairie 1,015,000 Road

7/13/2009

7/27/2009

$

1,026,000 Union City Rd.

7/28/2009

8/6/2009

$

600,000 Ray Quincy Rd.

8/10/2009

8/20/2009

$

875,000 Copeland Rd.

8/24/2009

9/10/2009

$

9/14/2009

9/24/2009

$

795,000 Southern Rd.

1.98 miles of Rehabilitation

9/28/2009

10/6/2009

$

695,000 Clarendon Rd.

3.53 miles of Rehabilitation

10/7/2009

10/26/2009

$

1,240,000 Burlington Rd.

10/27/2009

11/11/2009

$

1,012,000 Grove Rd.

4/1/2009

10/30/2010

$

8,184,000 Branch County 90,000 Warren Rd.

A T

e u

st

eq

s

O N

2.27 miles of Rehabilitation

R d

e t t

Funding Request

Route (Infrastructure Only)

PP

O R

1,270,000 Fremont Rd.

Warren Rd. Bridge over Tallahassee Crk.

Rehabilitation

3/2/2009

3/31/2009

$

Narrows Rd. Bridge over Coldwater River

Replacement

6/15/2009

9/30/2009

$

1,300,000 Narrows Rd.

Quimby Rd. Bridge over Wright Lake Channel Replacement

3/15/2009

6/15/2009

$

900,000 Quimby Rd.

Fremont Rd. Bridge over Tallahassee Crk.

Replacement

3/1/2010

5/28/2010

$

700,000 Fremont Rd.

Arbogast Rd. Bridge over St. Joseph River

Replacement

5/1/2010

10/29/2010

$

2,000,000 Arbogast Rd.

Ovid Twp.

South Angola Rd. Bridge over Coldwater River Replacement

5/31/2010

9/3/2010

$

820,000 S. Angola Rd.

Ovid Twp.

Central Rd. Bridge over Coldwater River

1/4/2010

5/28/2010

$

600,000 Central Rd.

02262009

Replacement

Submitted Requests - Not Approved

1184 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Branch County Road Commission Union Twp. Branch County Road Commission Matteson Twp. Branch County Road Commission Union Twp.

Branch-Hillsdale-St. Joseph Community Health Agency

Bronson City

Bronson Township Cass County Road Commission Cass County Road Commission Cass County Road Commission Cass County Road Commission City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit City of Detroit

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Gower Rd. Bridge over Coldwater River

Replacement

10/19/2009

4/16/2009

$

1,300,000 Gower Rd.

Lindley Rd. Bridge over Little Swan Creek

Replacement

11/2/2009

4/30/2010

$

700,000 Lindley Rd.

Clay Rd. Bridge over Union Drain #2

Replacement

11/30/2009

5/7/2010

$

550,000 Clay Rd.

Public Health Dental Clinic

Construction of a 3,800 sq.ft. building to house a 6 chair Public Health Dental Clinic. The clinic would be adjacnt to the existing the County's Human & Public Health services in Coldwater, MI. The dental clinic is designed to provide dental access & care to Adults & Children without insurance that are 180% of the proverty limit.

8/9/2009

$

840,000

Rural Development - Bronson

Upgrade the effeciences of local government by improving well houses, electricial, and security, installing a backup generator, overhauling a pump and motor, additional well and iron removal plant, and limited land acquisition to support these projects. 6/1/2009

4/1/2010

$

4,649,200

Bronson Twp.

Bronson Branch Library Barrier Free Access Project

Build addition to current library to include elevator and two handicapped assessible restrooms. Each bathroom is 25' X 25' and will allow for the use of increased hanicapped and aging population in the area.

5/1/2009

1/12/2009

$

275,000

LaGrange Township

Salt Storage Facility

Construction of a salt storage barn and mixed (salt/sand) storage facility

6/1/2009

8/1/2009

$

450,000 Redfield Street over Christianna 830,000 Creek

Coldwater, Michigan

Bronson City

T O

-N

Ontwa Township

Redfield Street Bridge

Construction of a defecient bridge with reduced weight limit on primary road.

LaGrange Township

Pokagon Highway Culvert

LaGrange Township Detroit Detroit

Kingbury Road Culvert Train Station Demolition Packard Plant Demolition

Detroit Detroit Detroit Detroit Detroit Detroit Detroit Detroit Detroit Detroit Detroit

Roosevelt Park DPS Warehouse Comercial Warehouse Demolition Factory Warehouse Demolition Apartment Complex Demolition Industrial Building Demolition Apartment Building Demolition Apartment Building Demolition Apartment Building Demolition Apartment Building Demolition Apartment Building Demolition Industrial Building Demolition

d e tt

t i m

ub

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

Alternative / Sustainable Energy

City of Detroit

Detroit

Streetscape, Parks & Landscaping

02262009

T Hangar Site Preparation

S

Land Acquisition (French Rd - Gilbo St.) Renovate Executive Terminal Horticulture Training

P P A

O R 1/1/2009

D VE

9/1/2009

11/15/2009

$

Replacement of culvert to prevent backwater threatening local structure

5/1/2009

6/1/2009

$

Replacement of culvert to prevent backwater threatening local structure Demolish large vacant, blighted, dangerous building structure Large Industrial Factory Complex – Multiple Buildings

5/1/2009 6/1/09 6/1/09

6/1/2009 6/1/2010 6/1/2010

$ $ $

6/1/09 6/1/09 6/1/09 6/1/09 6/1/09 6/1/09 6/1/09 6/1/09 6/1/09 6/1/09 6/1/09

10/1/2009 8/1/2009 10/1/2009 10/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 8/1/2009 2/1/2010

$ $ $ $ $ $ $ $ $ $ $

650,000 904,056 795,600 741,000 520,000 330,000 241,174 238,528 233,416 199,357 112,320

06/01/09

11/30/2009

$

4,500,000

03/30/09

2/28/2010

$

20,000,000

06/01/09

6/30/2010

$

7,000,000

05/30/09

$

500,000

05/30/09

$

800,000

$

1,200,000

s t s

e u

q e R

Demolish large commercial vacant warehouse (2231 Dalzelle aka 2001-43 14th St) Demolish commercial warehouse (282 Iron) Demolish large abandoned factory/warehouse (2900-2 Orleans Demolish large apartment complex multiple buildings (18520 W. Seven Mile Demolish industrial chemical storage (8611 Grinnell Demolish apartment building (7800 Pierson) Demolish large apartment building across from school (35 Owens) Demolish large apartment building (17111 Second) Demolish large abandoned apartment building (3265 W. Boston Demolish large apartment building on school route (31 Woodland Large industrial building adjacent to an elementary school (1909 Erskine Construct GA T-hangars to replace Conner T's (Part 77). Allows completion of Airport section of the Conner Greenway Project and introduce modern, fuel efficient hangars for storing and servicing aircraft. Purchase land needed for Runway 15-33 Part 77 surface clearance (appraisals, demolition, etc.) Renovate Executive Terminal for commercial and retail use with LEED certified technology including Green Roof and energy efficiency. Train youth (age 14-17) in area of urban farming from seed to harvest, including wholesale to retail. Focus on water and wind energy sources outlined by Michigan State University Land Use Institute Construction of new sidwalks, lighting, public park & plaza to adjacent to revitalized Argonaut Bldg.

Submitted Requests - Not Approved

5/1/09

9/30/2009

55,000 Pokagon Highway 55,000 Kingsbury Road 3,640,000 13,088,400

1185 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description Expand the college's continuing education dept. to offer retraining & professional development

Start Date

Expected Completion Date

City of Detroit

Detroit

City of Detroit

Detroit

Argonaut Project Work Development Southwest Health Center and Administrative Headquarters

9/1/09

City of Detroit

Detroit

Hart Plaza

Construct 48,000 sq. ft. Southwest Health Center and Administrative Headquarters. 05/30/09 Redesign and construct Hart Plaza, to include new amphitheater. Includes demolition of abandoned Ford Auditorium. 04/01/09 Transform once blighted and under utilized industrial/warehouse area into a new mixed-use district with a strong emphasis on new residential and recreational opportunities

9/1/2010

$

1,500,000

12/31/2009

$

17,000,000

$

40,000,000

$

7,000,000

$

21,600,000

6/30/2009

$

11,250,000

10/30/2009

Detroit

East Riverfront District Phase I

City of Detroit

Detroit

Streetscape & Open Space Improvements

City of Detroit

Detroit

I-94 Industrial Park

Improve the streets around the downtown area. Develop large land parcels suitable for advanced manufacturing, warehousing/logistics, and other industrial uses

Detroit

Cultural Center Parking/Electric Vehicle Charging Stations

Build 1,000 space parking deck on the Cultural Center parking lot and renovate the Farnsworth Garage, include capacity to charge electric vehicles in both facilities. Aligns with the Michigan Economic Recovery qualifying Criteria.

05/30/09

6/30/2010

$

15,000,000

Power Distribution Equipment Upgrade

Upgrade of 25-year old power distribution equipment (circuit breakers, switch gears, transformers, etc) in the two DTC central and eastside substations

8/15/09

4/15/2010

$

1,000,000

Vehicle Overhaul

Purchase of remaining components & equipment that must be accomplished as a part of the progressive DPM vehicle overhaul program, such as the truck overhaul, interior HVAC system, etc. 5/15/09

5/15/2010

$

2,000,000

6/01/09

9/1/2009

$

2,000,000

05/30/09

5/20/2011

$

44,728,000

06/30/09

10/1/2009

$

145,000

06/30/09

12/1/2009

$

150,000

06/30/09

11/1/2009

$

60,000

06/30/09

12/1/2009

$

1,800,000

06/30/09

7/1/2012

$

1,000,000

Remediation action is needed to remove contaminated soils and underground storage tanks. The remediation activity can be completed in 6 months. 06/30/09

12/1/2009

$

220,000

Proposed soil remediation can be completed in 3 months.

06/30/09

11/1/2009

$

75,000

Proposed soil remediation can be completed in 6 months

06/30/09

12/1/2009

$

320,000

06/30/09 06/30/09

12/1/2009 11/30/2009

$ $

180,000 180,000

06/30/09

11/30/2009

$

70,000

Proposed remediation and restoration. The soil cleanup activity can be completed in 3 months. 06/30/09

11/30/2009

$

97,800

City of Detroit

City of Detroit

City of Detroit

T O

P P A

-N

Upgrades to the HVAC system in the Maintenance & Control Facility to incorporate energy efficient materials & address air quality issues associated with the adjacent transit center Implement upgrades to reduce energy consumption, driven by sustainable design practices with a goal of LEED EB Certification Phase II Environmental Site Assessment -the proposed soil remediation can be completed in 4 months.

HVAC Improvements

s t s

e u

City of Detroit

Detroit

CAYMC Reinvestment Plan

City of Detroit

Detroit

1990 Guoin, Detroit, MI 48207

City of Detroit

Detroit

City Airport (10101 Grinnell, Detroit, MI 48213) Soil remediation, and tank removals can be completed in 6 months.

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

1538 Franklin, Detroit, MI 48207 Soil remediation, to prepare for redevelopment, can be completed in 4 months. Former Sears Site (10750 Grand River, Detroit, MI 48204) Soil remediation for the remaining portion of the site can be completed in 6 months. Harbor Hills (11000 Freud Avenue, Detroit, MI 48214) Proposed soil remediation / cleanup activities can be completed in 12 months.

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit City of Detroit

Detroit Detroit

City of Detroit

Detroit

Southwest Detroit Target Investigation Area (6319, 6327, 6333 Buelow, Detroit, MI 48209) Proposed soil remediation can be completed in 6 months. 2334 Buchanan, Detroit, MI 48208 Proposed soil remediation actitviy can be completed in 4 months Soil remediation can be completed in 5 months in order to prepare the site for 3455 Woodward Ave., Detroit, MI 48201 development.

Detroit

Wholesale A & B (1580 Wilkins, 3085 Orleans, 3101 Orleans, & 1850 Erskine, Detroit, MI 48207)

City of Detroit

02262009

u S

R d

e t t

it

7504 Fenkell Detroit, MI 48238 DWSD Old Central Yard (1555 Erskine, Detroit, MI 48207) Maria Plating (6425 Charlevoix, Detroit, MI 48207)

bm

eq

Submitted Requests - Not Approved

O R

04/01/09 02/04/09

6/1/2009

D VE

City of Detroit

City of Detroit

04/01/09

Funding Request

8/31/2009

Route (Infrastructure Only)

1186 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit City of Detroit

Detroit Detroit

City of Detroit

Detroit

City of Detroit

Detroit

Project Name Project Description Start Date Revere Copper Brass (5851 West Jefferson, The area of soil contamination is approximately 80,000 sq ft. for the site cleanup to be Detroit, MI 48209) completed in 8 months. 06/30/09 Statler Hilton (1539 Washington Blvd, Detroit, MI 48226) Abatement and demolition activities can be completed in 12 months. . 06/30/09 Soil remediation activities, to prepare the site for development, can be completed in 4 months 06/30/09 9191 W. Fort Street, Detroit, MI 48209 3600 Toledo, Detroit, MI 48216 Contaminated soil removal activity would be completed in 6 months 06/30/09 Soil remediation activities, to prepare the site for development, can be completed in 4 months 06/30/09 406 E. State Fair, Detroit, MI 48203 Shoemaker (11031 shoemaker, Detroit, MI 48213) Site remediation and soil verification activities can be completed in 12 months 06/30/09

City of Detroit

Detroit

Michigan Avenue & 31st Street (4638 to 4730 Michigan & 3724 31st Street, Detroit, MI 48210) Soil remediation, to prepare for development, can be completed in 6 months

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

DPW/GSD Livernois/Vernor Maintenance facility (2141 Livernois, Detroit, MI 48209) Southwest Detroit Target Investigation Area (650 Livernois, Detroit, MI 48209) Ford Auditorium (2 East Jefferson, Detroit, MI 48226) Southwest Detroit Target Investigation Area, Detroit, MI 48209 Carter Color Coat (60551 Hastings, Detroit, MI 48211)

City of Detroit

Detroit

1939 Guoin, Detroit, MI 48207

City of Detroit

Detroit

900 Merrill Plaissancee Upgrade

City of Detroit

Detroit

Training Academy Addition

City of Detroit City of Detroit City of Detroit City of Detroit

Detroit Detroit Detroit Detroit

Electrical System / Generators Upgrades Roof Replacements Kitchen Remodeling Two New Fire Stations

City of Detroit

Detroit

Vernor / Livernois Garage Facility

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit City of Detroit

Detroit Detroit

d e tt

t i m

S

900,000

7/15/2010

$

500,000

$ $

75,000 255,000

$

50,000

$

600,000

12/1/2009

$

160,000

06/30/09

7/1/2010

$

1,000,000

06/30/09

1/5/2010

$

100,000

06/30/09

12/1/2009

$

200,000

06/30/09

2/1/2010

$

150,000

The proposed soil cleanup can be completed in 6 months. Remove underground storage tanks and the contaminated soils. The cleanup activities can be completed in 4 months.

06/30/09

12/1/2009

$

1,200,000

06/30/09

11/1/2009

$

95,000

Remodel fire station to house EMS Medic Unit and other major emergency units. Construct 3 story addition at the Fire Training academy to allow the merge of of 2 training locations.

5/30/2009

12/31/2009

$

1,000,000

5/9/2009

3/30/2010

$

3,000,000

5/30/2009 5/30/2009 5/30/2009 10/1/09

6/30/2009 7/30/2009 12/31/2009 10/30/2010

$ $ $ $

1,500,000 600,000 500,000 8,000,000

06/01/09

8/1/2010

$

13,500,000

3/30/2012

$

3,750,000

2/1/2012

$

12,000,000

3/30/2012 7/1/2010

$ $

2,250,000 16,461,000

12/31/2011

$

13,888,000

3/30/2012

$

2,370,000

A T

The proposed site cleanup activities are estimated to take 12 months. Soil remediation can be completed in 5 months.

O N

The proposed hazard abatement (asbestos and others).

s

The site remediation activities (underground storage) can be completed in 8 months

e u

st

q e R

Upgrade electrical systems at approximately 25 of the DFD’s properties. This would include the installation of generators at each of these properties. Replace roofs at 15 DFD locations. Remodel/upgrade approximately 10 of the DFD’s 48 kitchens Construct two 4-bay fire stations Build a state of the art green GSD garage facility on City-owned property and complete environmental clean-up of Vernor/Livernois site.

Safely remove 5,000 trees, the stimulus package will create an additional 50 jobs with contract vendors to assist the City of Detroit in removal of his hazard. 2/09 Upgrade staff skills and develop new multi-disciplinary positions that would combine forestry, landscape and floriculture. 03/30/09 The streetscape improvements, landscaping and pedestrian lighting. 07/01/09

Patton Park Master Plan Improvements

City of Detroit

Detroit

Emerald Ash Borer Forest Restoration

Combined Sewerage Overflow (CSO) facility installation in the park. The then-$20M price tag included the $8.2M improvements already made to the Patton Park Recreation Center. 06/01/09 Re-forest 15,000 trees in the City right of way, vacant lots, and parks. Trees would be planted at a rate of 5,000 trees per year for three years. 03/30/09

Submitted Requests - Not Approved

11/30/2009 12/1/2009 11/1/2009

O R

PP

06/30/09

Dead Tree Removal Tree Artisan & Ground Maintenance Apprentices SW Detroit Greenway Phase II, III, IV

Detroit

02262009

$

Develope Green Workforce

City of Detroit

Funding Request

2/1/2010

Retrain facilities maintenance workforce to focus on energy efficiency best practices to implement throughout existing aged city properties. Train mechanic apprentices on proper repair and maintenance of hybrid vehicles to be acquired by the City. 03/30/09

ub

Expected Completion Date

7/1/2010

D VE

Route (Infrastructure Only)

1187 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Dental Clinic Expansion

Corktown Mexicantown Green Link - on-road bike lane connections throughout the Corktown and Mexicantown neighborhoods of the near-southwest side. Total miles: 1406/01/09 Renovate existing facility to combine two dental clinics for greater operational and service efficiencies. 05/01/09

10/1/2009

New Public Health Department Facility

Build a new Sustainable and Green Building for the Public Health Department. Estimate :$50,000,000 to design, build and furnish the new facility.

05/30/09

12/31/2010

O R

City of Detroit

Detroit

Corktown/ Mexicantown Green Link

City of Detroit

Detroit

City of Detroit

Detroit

7/20/2009

Funding Request

$

1,300,000

D VE $

700,000

$

50,000,000

$

9,200,000

3/31/2010

$

2,000,000

3/31/2010

$

2,000,000

12/31/2010

$

7,000,000

City of Detroit

Detroit

Detroit Animal Care and Control Facility

City of Detroit

Detroit

Northeast Health Center Renovations

Construct new animal control and care facility to replace existing facility and incorporate Green technologies. Department has approximately one third of the funding in place. 03/01/09 Upgrades NE Health Center to enhance clinic efficiencies, technologies and achieve energy savings 03/09/09

City of Detroit

Detroit

Grace Ross Health Center Renovations

Update Grace Ross Health Center to enhance clinic efficiencies, technology, energy savings, patient flow and handicap accessibility; including an elevator. 02/01/09

City of Detroit

Detroit

Education & Training Facility

Obtain and develop a state of the art facility to implement Heads Start services

7/15/2009

$

4,000,000

T O

P P A 5/30/09

12/31/2009

City of Detroit

Detroit

Wireless Data Network Upgrade for Public Safety

City of Detroit

Detroit

Data Center Modernization

The City of Detroit Public Safety departments, Police, Fire, and EMS, are currently running on an 800 MHz system. The City of Detroit is currently using the 800 MHz system for voice communications only. Implement an upgrade of the City of Detroit’s wir 5/15/09 Upgrade the data center to a Tier 3 data center to reduce ITS’ operating cost in water, electricity and current rent 6/1/09

8/30/2009

$

2,700,000

Enterprise GIS Partnership

Geographic Information Systems (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying all forms of geographically referenced information. 7/15/09

8/30/2009

$

700,000

Renovate the historic Channel 56 building into a center for arts and employability training, incorporating Green Technology. It will be accessible to all Detroit youth, while targeting economically-disadvantaged youth from the North End where it is locate

6/1/09

7/1/2010

$

6,000,000

Structural, electrical and mechanical repairs to underground parking structure

6/30/09

2/28/2010

$

1,600,000

Structural, electrical and mechanical repairs to underground parking structure

3/30/09

9/30/2009

$

2,708,512

Structural, electrical and mechanical repairs to underground parking structure Structural, repairs to parking structure Install security video monitoring system in city parking facilities Install parking structure traffic monitoring system.

4/30/09 3/30/09 3/30/09 3/30/09

10/31/2010 7/30/2010 4/30/2009 4/30/2009

$ $ $ $

3,064,944 514,034 172,875 305,973

Structural, electrical and mechanical repairs to underground parking structure

4/30/09

10/31/2010

$

2,600,000

Harbor Hill Marina

Community development on the east Detroit Riverfront at St. Jean Street. As part of the Phase I project, a marina and clubhouse will be constructed. Phase II will include the construction of approximately 356 condominium units. 02/01/09

12/31/2011

$

5,000,000

Harbor Hill Infrastructure Project

Seawall improvement to support 560 residential units. Activities will consist of the following: sanitary and storm sewers, water mains, all electrical conduits road and mass grading, street lighting and landscaping.

06/01/09

12/31/2011

$

15,000,000

Cornerstone Estates: Jeffries East

Infrastructure improvements for fifteen acres of new residential units. Improvements include: street landscaping, lights, water main, street paving and resurfacing, ADA side walk compliance, installation of curb drainage system.

06/01/09

6/30/2010

$

3,000,000

City of Detroit

Detroit

City of Detroit

Detroit

Mosaic Youth Arts Center

City of Detroit

Detroit

Grand Circus Park Garage

City of Detroit

Detroit

Ford Underground Garage

City of Detroit City of Detroit City of Detroit City of Detroit

Detroit Detroit Detroit Detroit

Cultural Center Garage Premier Garage System Wide Video Monitoring System Wide Traffic Monitoring System

City of Detroit

Detroit

Joe Louis Garage

City of Detroit

City of Detroit

City of Detroit

Detroit

Detroit

Detroit

02262009

tt i m

d e t

S

ub

s t s

-N

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

1188 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Detroit

Detroit

Core City Residential Project

Infrastructure improvements to support proposed residential units. Improvements to include: water mains, street resurfacing, sidewalks, street landscaping and lighting.

06/01/09

6/30/2010

City of Detroit

Detroit

Morgan Estates Phase II

Morgan Estates Phase II will consist of twenty six (26) luxury single-family homes.

02/01/09

12/31/2011

Market Square Residential Project

Provide Infrastructure improvements to support seven (7) acres of residential units. Improvements to include: street resurfacing, landscaping, lighting, water main improvements, ADA sidewalk compliance improvements.

06/01/09

6/30/2010

Lenox Waterfront Estates

Lenox Waterfront Estates consist of development of eighteen (18) luxury single family homes in the Jefferson-Chalmers Citizens Rehabilitation Project. This site is approximately 17,5 acres. 02/01/09

City of Detroit

City of Detroit

Detroit

Detroit

City of Detroit

Detroit

Emerald Springs

City of Detroit

Detroit

Far East Side Development Project

City of Detroit

Detroit

District Improvement Plan-Early Warning System

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit City of Detroit

D VE

5,000,000

$

2,000,000

12/31/2011

$

7,500,000

5/30/2011

$

14,000,000

12/31/2012

$

34,000,000

4/1/09

5/30/2010

$

750,000

4/1/09

5/30/2010

$

10,883,600

O R

P P A 05/30/09

5/30/2011

$

8,097,000

Detroit

05/30/09

5/30/2011

$

4,250,000

Detroit

District Improvement Plan-Police Stations

Remodel (12) 30,000 square foot city owned building to be used as precincts.

4/1/09

5/30/2011

$

68,400,000

Detroit Police Department Narcotic Enforcement Youth Initiative aimed at enhancing the students and environment at Detroit Public High Schools. Total to fund Operation for 2 years. 3/1/09

5/30/2011

$

396,265

Install, deploy License Plate Recognition Technology in 30 police cruisers (Traffic Enforcement Unit/Tactical Mobile Unit). Includes equipment, installation and software. 05/30/09

5/30/2011

$

530,000

Build a new 300 bed detention facility.

05/30/09

5/30/2011

$

10,000,000

4/1/09 05/30/09

5/30/2011 5/30/2010

$ $

53,000,000 12,000,000

12/1/2009

$

1,808,606

5/30/2011

$

1,600,000

s t s

-N

e u

eq

Detroit

Finney Youth Initiative

City of Detroit

Detroit

License Plate Recognition Technology Deployment

City of Detroit

Detroit

District Improvement Plan- Detention Facility

City of Detroit City of Detroit

Detroit Detroit

District Improvement Plan-DPD Headquarters Build a new 200,000 square foot police headquarters. Paper Reduction / File Management Paper Reduction/File Management System for all City Departments

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

2,000,000

Develop comprehensive personnel early warning system to comply with the requirements of the Use of Force and Arrest and Detention Consent Decree. Retrofit the older vehicles with updated in car video/Mobile Data Computer system to In Car Video/MDC System meet requirements of the Department of Justice. Replace roofs, HVAC systems and parking lots seven DPD locations with for energy Roof Replacements efficiency. District Improvement Plan - Training & Driving Build a 3,000 square foot classroom building with 20 acre parcel of land for police Range driving range.

City of Detroit

City of Detroit City of Detroit City of Detroit

$ $

Infrastructure improvements of new construction to support 206 residential units. Improvements to include the following: new road construction, resurfacing, new water mains, lighting, street landscaping, ADA side walk compliance, curbside drainage. 05/30/09 Infrastructure to include roads, sidewalks, ADA sidewalks compliance, lights, curb drainage, street landscaping 6/1/09

T O

Funding Request

Detroit Detroit Detroit

Detroit

02262009

R d

e t tt

i m

Shooting and Fire Arm Tip Line

Purchase and equip two (2) infrastructure protection helicopters for use by the Detroit Police Department as a fuel-efficient means of patrolling large areas. 05/30/09 Locate a recreational facility capable of being the base of operation for Gang and Enforcement and the youth of Detroit. 05/30/09 DPD SHOOTING AND FIREARMS TIP LINE to hire, train and staff tip line in the city of Detroit. 05/30/09

5/30/2011

$

750,000

Copper Theft New Police Officers Hybrid Patrol Vehicles

Fund manpower and equipment designated to the Copper Theft Task Force to identify and apprehend scrap metal thieves. The funds would pay for overtime, vehicles, police equipment dedicated to this function. 6/1/09 Hire and retain 1,000 additional police officers 4/1/09 Purchase 6 vehicles, 6 license plate readers. 5/30/2009

5/30/2011 5/30/2011 8/30/2009

$ $ $

1,148,013 75,000,000 330,000

Streetlight Upgrade

The upgrade would involve substantial rewiring, replacement of poles, luminaries, lamps, and associated controls. This would result in improved reliability, reduced maintenance cost, lower energy usage.

12/31/2013

$

193,000,000

ub

Infrastructure Protection Helicopter Detroit Academic/Recreational Facility for Youth

S

Submitted Requests - Not Approved

06/01/09

Route (Infrastructure Only)

1189 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

City of Detroit

Detroit

Mistersky-New Electrical Energy Generation

City of Detroit

Detroit

Stanton Electrical System Upgrade

City of Detroit

Detroit

Stone Electrical System Upgrade

City of Detroit

Detroit

Townsend Electrical System

City of Detroit

Detroit

Walton Electrical System Upgrade

City of Detroit

Detroit

Belle Isle Electrical System Upgrade

City of Detroit City of Detroit

Detroit Detroit

SCADA Upgrade Rosedale Park Lighting Upgrade

City of Detroit

Detroit

Remote Meter Reading System

City of Detroit

Detroit

Palmer Electrical System Upgrade

City of Detroit

Detroit

LaBelle Electrical System Upgrade

City of Detroit

Detroit

Lothrup Electrical System Upgrade

City of Detroit

Detroit

Joseph Campau Electrical System Upgrade

City of Detroit

Detroit

Joy Road Electrical System Upgrade

City of Detroit

Detroit

City of Detroit City of Detroit

Detroit Detroit

Hudson Electrical System Upgrade Green Acres / Sherwood Forest Lighting Upgrade Foxtown District Lighting Upgrade

City of Detroit

Detroit

Conner Electrical System Upgrade

City of Detroit

Detroit

Butzel Electrical System Upgrade

City of Detroit

Detroit

PLD Building & Office Improvements

City of Detroit

Detroit

Witkowski System Map Board Upgrade

City of Detroit

Detroit

City of Detroit City of Detroit

Detroit Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

02262009

d e tt

it

m b u

New Electrical Grid Connections

Start Date

Replace three existing generators with two 60MW quick start natural gas generators. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Upgrade outdated electrical distribution system servicing the island. Increase in the operating voltage will result in reduced line losses. SCADA System Upgrade to Linux operating system with energy efficient LCD displays. Work station systems based on computing platforms. Replace outdated mercury vapor lighting with energy efficient fixtures Install remote readable meters to eliminate the fuel usage required for manual meter reads. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses.

e u

st

q e R

O N

Replacing outdated mercury vapor lighting with more efficient fixtures. Replacing outdated lighting fixtures with more energy efficient fixtures Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Replace outdated electrical distribution system. Increase in the operating voltage will result in reduced line losses. Upgrade and/or replace HVAC, electrical systems, mechanical systems, plumbing, and structural improvements at PLD’s main office. Electrical system map board upgrade: Replace antique static map board system to new dynamic mosaic system. Install 120 KV connections between Public Lightening and national electrical grid to improve system reliability.

Mistersky 24 KV Switch House Replacement Replace obsolete 24 KV oil circuit breakers at the power plant. Mistersky Gas Turbine Overhau Major overhaul of 27 MW electric generation gas turbine

S

Conner Creek Greenway

Create greenway on the eastside of Detroit connecting Maheras Gentry Park to the border of the city of Warren. Total miles to be constructed with stimulus support: 2.5 out of a total of 10

150 miles of streets will be repaved within the City of Detroit. We understand that Reconstruction or Resurfacing of 150 miles of 50% of funding must be obligated by July 1, 2009 with balance obligated by July, 1 Streets 2010. Rehabilitation of 11 Vehicular and Pedestrian Eleven vehicular or pedestrian bridges throughout the City of Detroit will be Bridge reconstructed or rehabilitated.

Submitted Requests - Not Approved

Funding Request

03/01/09

12/31/2011

$

85,000,000

06/01/09

12/31/2010

$

12,000,000

06/01/09

12/31/2010

$

5,000,000

06/01/09

12/31/2010

$

2,000,000

$

4,000,000

PP

6/30/2011

$

12,000,000

12/31/2009 12/31/2010

$ $

100,000 1,500,000

06/01/09

6/30/2010

$

1,250,000

06/01/09

12/31/2010

$

7,000,000

06/01/09

12/31/2010

$

4,000,000

06/01/09

12/31/2010

$

3,000,000

06/01/09

12/31/2010

$

7,000,000

06/01/09

12/31/2010

$

6,000,000

06/01/09

12/31/2010

$

500,000

06/01/09 06/01/09

12/31/2010 12/31/2010

$ $

1,500,000 1,000,000

06/01/09

12/31/2010

$

6,000,000

06/01/09

12/31/2010

$

8,000,000

03/30/09

6/30/2010

$

2,000,000

03/30/09

12/31/2009

$

300,000

6/1/2009

6/30/2012

$

41,000,000

6/30/09 6/31/09

12/31/2011 6/30/2010

$ $

15,000,000 2,500,000

06/01/09

6/30/2009

$

2,000,000

07/01/09

12/1/2011

$

75,000,000

12/01/09

2/1/2011

$

17,000,000

O R

06/01/09 06/01/09

03/30/09 06/01/09

A T

s

Expected Completion Date

12/31/2010

Route (Infrastructure Only)

D VE

1190 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

City of Detroit

Detroit

Retrofit of Pedestrian Traffic Signals

Improve traffic safety by retrofitting pedestrian traffic signals with countdown timers and push buttons at 100 intersections throughout the city.

07/01/09

6/30/2010

City of Detroit

Detroit

Construction of ADA Compliant Ramps

Construct over 3500 ADA compliant handicap ramps in the downtown and midtown areas bounded by Detroit River, Grand Blvd., Lodge and Chrysler freeways.

6/1/09

12/1/2010

City of Detroit

Detroit

Dequindre Cut Non-Motorized Improvements Construct non-motorized and walkway improvements along the Dequindre Cut.

01/01/10

12/1/2012

City of Detroit

Detroit

Eastside DPW Multi-Use Transfer Facility

City of Detroit

Detroit

Illuminated Street Name Sign

City of Detroit City of Detroit

Detroit Detroit

Non-motorized improvements on Jefferson Install new pedestrian crosswalks

Acquire land and construct multiple use, environmentally friendly DPW refuse transfer facility (east side). Facility will increase operational efficiency, while minimizing use of fossil fuels. 07/01/09 Construct and Install illuminated large street name signs at 25 different locations in the downtown loop area. 07/01/09 Construct streetscape and non-motorized improvements in Fox Creek area on E.Jefferson; gateway between Alter & Eastlawn. 07/01/09 Install new pedestrian crosswalks in the downtown and midtown areas. 07/01/09

$

500,000

D VE $

10,000,000

$

7,000,000

$

6,500,000

12/1/2009

$

500,000

12/31/2010 12/1/2009

$ $

2,700,000 500,000

O R

P P A

Funding Request

12/1/2012

City of Detroit City of Detroit

Detroit Detroit

District maintenance and Stockroom Detroit Parks Renovation

City of Detroit

Detroit

Detroit Recreation Center Revitalizations

Construct energy efficient building to house the Street Maintenance staff. Building to be constructed to conform with energy efficient requirements to attain LEED certificaiton, utilizing stragegies such as reuse of salvaged and recycled material, incorp 6/1/09 Renovate 20 parks to revitalize the surrounding neighborhoods 05/30/09 Construct 2 new recreation centers to replace aging buildings (green technologies into the design). 05/30/09

5/30/2011

$

30,000,000

Southwest Detroit Dearborn Greenway

Greenway link connecting the Salina Arab retail and residential district, Lapeer Park in Dearborn, Ford's Visitor Center at the Rouge Manufacturing Center and historic Eagle Pass in Dearborn to Patton Park. 09/01/09

11/1/2009

$

19,167,101

Implement green solutions for improved energy use, cleaner air, eco-friendly and reduced maintenance. Add energy efficient maintenance facilities save electricity cost utilizing green practices. 05/30/09

5/30/2011

$

64,000,000

City of Detroit

Detroit

City of Detroit

Detroit

Transportation Facility Improvements

City of Detroit

Detroit

Hybrid and Biodiesel Buses

City of Detroit

Detroit

Woodward Light Rail Transit

City of Detroit

Detroit

Midtown Detroit Green Alley Demostration Project

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit

Detroit

itt

d e t

T O

m b u

Cass Avenue Lighting Project Brush Mall Greenway

S

e u

q e R

Midtown Detroit Community Garden

s t s

-N

$ $

4,000,000 10,000,000

05/30/09

5/30/2011

$

35,000,000

The initial link to regional mass transit for the Metro Detroit area. Complete design and construct the Woodward light rail transit line proposed to operate between the Central Business Distrtict and State Fairgrounds.

05/30/09

5/30/2013

$

450,300,000

This project will transform a blighted 220’ section of alley off Second Avenue between Canfield and Prentis into a safe, green alley for the neighborhood. 05/01/09

6/30/2009

$

89,000

6/30/2009

$

100,000

9/1/2009

$

768,000

7/20/2009

$

2,500,000

Implement electronic medical records systems and Health Information Exchange to help prevent medical mistakes and coordination of care for medically underserved populations. Construct a new 96' diameter pipeline which extends from Romeo to Washington pumping station.

03/09/09

6/30/2010

$

1,500,000

05/01/09

7/31/2012

$

225,000,000

Install a pipeline that connects Auburn Hills transmission line to Holly, Michigan line.

05/01/09

7/31/2012

$

160,000,000

Reconstruct shaft close to Eliza Howell Park to be supported by major reconstruction. 05/01/09

1/27/2014

$

270,600,000

6/6/2013

$

316,170,200

City of Detroit

Detroit

City of Detroit

Romeo

City of Detroit

Auburn Hills

Health Center Controlled Network of the Voices of Detroit Initiative Transmission Main from Romeo to Walton Road (CM-2016) Grand Blanc, Auburn Hills and Washington Pumping Stations (CM-2019)

City of Detroit

Detroit

Upper Rouge North Tunnel Project (PC-763)

City of Detroit

Detroit

Upper Rouge South Tunnel Project (PC-764) This excavation project will allow for renovation of pumping station work shaft.

02262009

12/1/2010 12/31/2010

Purchase hybrid and bio-diesel fuel buses for energy efficiency and independence.

Create a community garden. Work will begin in spring with the creation of flower and vegetable beds, greenhouse, cold beds, composting system, sustainable storm water management system. 05/01/09 Install 32 new decorative streetlights on Cass Avenue from I-94 to Canfield. This includes new cable and select conduit replacement. 6/30/09 Twelve ft wide patterned/stained concrete path/sidewalk and landscaped). Street and bike furniture are part of the greenway. Total Miles 1.5 06/01/09

Submitted Requests - Not Approved

05/01/09

Route (Infrastructure Only)

1191 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency City of Detroit City of Detroit

Detroit Detroit

City of Detroit

Detroit

City of Detroit

Detroit

City of Detroit City of Greenville

Detroit

Project Name Upper Rouge Tunnel Project Near Surface (PC-765) New Detroit River Outfall (PC-771)

Project Description

Start Date

This project is designed to intercept and divert the combined sewer overflow. Install chlorination lines and diffusers. Renovate hydraulic control devices

DWEJ’s Green Jobs Training Program focuses on providing high-quality training to underemployed and unemployed Detroit residents in the burgeoning job sectors of energy efficiency, conservation, weatherization assistance, retrofitting, green Green Jobs Training Program community revi Road Constructon Apprenticeship Readiness Customized training for women, minorities, and low-income individuals for road Program construction apprenticeships.

City of Greenville

Training for low-income indiviuals for apprenticeships for carpenters, ironworkers, Detroit Pre-Apprentice Construction Tranining electricians, plumbers, laborers and other construction trades. 2-Post Mobil Lift Ari-Hetra Mobil Hoist Relocate the municipal airport to the industrial growth area, with capability for Airport Relocation commercial traffic.

City of Greenville City of Greenville City of Greenville

Baldwin Street Reconstruction/Resurfacing Barry St Water Main Upgrade/Loop Benton St. Water Main Upgrade/Loop

City of Greenville City of Greenville City of Greenville

Charles Street Relocation Clay Street Reconstruction/Resurfacing Clay Street Reconstruction/Resurfacing

City of Greenville

Coffren Street Reconstruction/Resurfacing

City of Greenville

Community Center Expansion - Phase 1

City of Greenville City of Greenville City of Greenville City of Greenville

Community Center Parking Lot Expansion Crescent St. Water Main Extension/Loop Develop additional well field Document Imaging

City of Greenville

Fred Meijer Flat River Trail/Tunnel

City of Greenville

Grove Street Combined Sewer Separation

City of Greenville City of Greenville City of Greenville City of Greenville

City of Greenville City of Greenville City of Greenville City of Greenville City of Greenville

City of Greenville

02262009

T O

1/18/2012 12/23/2013

06/01/09

8/1/2009

03/30/09

5/30/2009

06/01/09

P P A

O R

N s

st

9/30/2009

$ $

D VE $

1,300,000

$

450,000

$ $

900,000 15,000

$

5,000,000

$ $ $

217,060 23,000 55,000

$ $ $

365,500 546,760 298,320

$

332,510 3,854,800

$ $ $ $

125,000 25,000 500,000 50,000

$

1,000,000

$

40,000

Hillcrest Street Reconstruction/Resurfacing Johnson Ct. Water Main Extension

Reconstruct and resurface Hillcrest Street from M-57 to Montcalm Extend new 6" w/m to serve unserved area

$ $

227,290 14,000

Judd St. Reconstruction - Cedar to Maple LEED Solar Lighting

Add curb, drainage, and resurface Convert the existing street light system to be solar powered

$ $

30,000 1,800,000

Montcalm Street Reconstruction/Resurfacing Reconstruct and resurface Montcalm Street from Hillcrest to Franklin Replace existing salt storage w/ larger capacity unit, and install liquid calcium chloride New Salt Storage Shedd tank

$

499,120

$

40,000

Northeast Area Combined Sewer Separation Oak Street Reconstruction/Resurfacing Oak Street Water Main Upgrade Orange St. Water Main Upgrade

Separate the combined sewer system on Coffren, Pearl and Summit Streets. Reconstruct and resurface Oak Street from David to Baldwin Upgrade 1.5" pipe to 6" pipe Upgrade 1.5" pipe to 6" pipe

$ $ $ $

750,000 204,130 30,000 70,000

Public Building Green Energy

Collaborative project between the City of Greenville and Greenville Public Schools to install solar panels on municipal and school facilities to independently power all electri needs using green technology.

$

36,000,000

d e t

e u

q e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

59,290,385 299,399,600

$

ub

S

Reconstruct and resurface Baldwin Street from M-57 to South Upgrade 1" pipe to 6" pipe & provide loop Upgrade 1.5" & 2" pipe to 6" & provide loop Provide realignment of Charles Street to facilitate redevelopment of Electrolux Brownfield. Reconstruct and resurface Clay Street from Montcalm to Fairplains Street Add curbs and resurface Clay Street from Charles to Coffren

07/20/09 07/20/09

Funding Request

Reconstruct and resurface Coffren Street from M-91 to Walnut Street Construct an addition to the existing Greenville Area Community Center to provide for expanded activities as identified by needs assessment. Construct parking lot expansion on existing City land to provide for parking for current and future needs. Connect two ends of existing 8" Water Main Identify location, and develop second water source Provide for scanning and cataloging of permanent record material Construct 2 miles of trail including a tunnel under M-57 to complete an 8 mile loop facilitating quality of life and economic development. Provide outlet for separation project that was done as part of last years Grove Street road project.

tt i m

City of Greenville

Expected Completion Date

1192 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description Increase the size of existing trunkline sewer that have been identified as being insufficient for future development needs. Add storage to service bldg, install fire dect. System, pave lot

Start Date

City of Greenville City of Greenville

Sanitary Sewer Trunkline Capacity Increase Service Bldg Addition/Improvements

City of Greenville

South Street Reconstruction/Resurfacing

City of Greenville City of Greenville

Wastewater Treatment Plant Expansion Wastewater Treatment Plant Generator

Reconstruct and resurface South Street from Macomber to M-91. Increase the capacity of the WWTP to provide for the needs of anticipated industrial growth. Provide for mandated secondary power feed for the WWTP.

City of Greenville City of Greenville

Water Tower Well Field Control Bldg. Upgrade

Construct a new water tower in the west development area to provide consistent water supply to the low pressure district and facilitate new growth. stndby pwr, scada, chemical feed, pipe updrades

Replace 22 buses used in Livonia Community Transit program, which serves senior citizens and handicapped residents on trips across and beyond the City and serves two hubs for regional bus riders traveling to jobs in the City. Reconstruct Newburgh Road from Six Mile to Seven Mile Roads with 9-inch nonreinforced concrete in Livonia. Modernize traffic signals in the corridor.

City of Livonia

Livonia, Michigan

City of Livonia

Livonia, Michigan

Livonia Community Transit buses Reconstruct Newburgh Road (Six Mile to Seven Mile)

City of Livonia

Livonia, Michigan

Resurface Middlebelt Road (Seven Mile to Eight Mile Road)

City of Livonia

Livonia, Michigan

City of Livonia

Livonia, Michigan

City of Livonia

Livonia, Michigan

City of Livonia

Livonia, Michigan

City of Livonia

Livonia, Michigan

Resurface or Reconstruct Haggerty Road, from Six Mile to Seven Mile Road. Resurface Inkster Road Road (Five Mile to Six Mile Road) Resurface Inkster Road Road (Six Mile to Seven Mile) Reconstruct Lyndon Road (Henry Ruff to Middlebelt) Reconstruct West Chicago (Middlebelt to Harrison)

City of Livonia

Livonia, Michigan

City of Livonia

Livonia, Michigan

e t tt

i m

City of Marquette Board of Light and Power

b u S

City of Marquette and surrounding area in Marquette County

02262009

Renewable Energy Biomass Conversion Project

Funding Request $ $

O R

P P A

D VE $

171,580

$ $

2,400,000 100,000

$ $

805,000 200,000

4/1/2009

$

1,300,000

90-160 days

12/1/2009

$

3,900,000

Resurface 5 lane road with 3 1/2-inch HMA overlay with base repair. Wayne County scheduled to resurface Middlebelt from Five Mile to Seven Mile in 2009. 120 days

11/1/2009

$

1,100,000

Resurface 5 lane road with 3 1/2-inch HMA overlay with base repair. Wayne County will deterimine if road should be reconstructed or resurfaced. 175 days

December 2009'

$

1,650,000

90-120 days

11/1/2009

$

1,400,000

Resurface 5 lane road with 3 1/2-inch HMA overlay with base repair. 90-120 days Reconstruct a 9-inch nonreinforced concrete collector road, Lyndon (Henry Ruff to Middlebelt) 45 days Reconstruct a 9-inch nonreinforced concrete collector road, West Chicago (Middlebelt to Harrison). 45 days Upgrade and modernize traffic signals to improve the flow of traffic at several locations across the city. 90-120 days

11/1/2009

$

1,300,000

7/1/2009

$

675,000

7/1/2009

$

750,000

11/1/2009

$

250,000

Replace existing 12-inch water main on West Chicago from Harrison to Middlebelt

6/1/2009

$

380,000

6/30/2010

$

3,750,000

T O

N s

st

Resurface 5 lane road with 3 1/2-inch HMA overlay with base repair.

e u

eq

60 days

This project involves the conversion of a 20 MW bituminous coal plant to biomass utilization. Natural gas could be used as a supplemental fuel to entirely eliminate coal usage in this unit potentially reducing carbon emissions with the goal of 100% reduction of carbon emissions. With this conversion project, we will participate in a Center of Energy Excellence (CEE) as a Biomass Beta Test Center. In the CEE, we will partner with local industry, Northern Michigan University, and the State of Michigan in achieving innovative technological advancements in green energy production. This project includes modifications and equipment upgrades to accomodate efficient biomass (wood and wood by-products) utilization. Burning 100% wood and wood byproducts in this unit would achieve carbon neutral energy production. The source for the biomass material will be procured from local end use waste from the forest products industry. This sustainable supply chain will support the local economy through creation of jobs and additional opportunities for existing and new forest products industry participants. 7/1/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

130,000 75,000

30 days

R d

Upgrade and modernize traffic signals Replace aged 12-inch water main on West Chicago (Harrison to Middlebelt)

Expected Completion Date

1193 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of Marquette Board of Light and Power

City of Marquette and surrounding area in Marquette County

Project Name

Project Description

Start Date

Renewable Energy Hydro Project

This project consists of the reconstruction and update of Hydro facilities owned by the City of Marquette Board of Light and Power (MBLP). These facilities are located on the Dead River in Marquette, MI. The generator at this facility is a 700kW unit. This project will increase the MBLP's renewable energy capacity, thereby reducing the magnitude to which the MBLP's native load is served by coal fired steam generation. This will reduce carbon emissions and other emissions generated by coal production. Included in the scope of this proposal are expenditures for updated controls for greater efficiency, Hydro infrastructure reconstruction, and natural resource enhancement. Reconstruction of the existing Hydro facility to produce renewable green energy and enhance the recreational resources in the area will encourage tourism and travel to the region, thereby creating jobs and producing economic benefits to the local and regional economies. This project will also lower the average cost of electricity to the customers of the MBLP. The customers of the City of Marquette Board of Light and Power are spread over a large geographic area includin 7/1/2009

Smart Meter to Smart Grid Project

The Marquette Board of Light and Power (MBLP) has approved a $3,000,000.00 Advanced Metering Infrastructure (AMI) "Smart Meter to Smart Grid" project that will help customers and the utility save money by gaining greater energy efficiencies. The budgeted Smart Meter Project, to be implemented in three phases beginning in September of 2009,, includes installation of new "smart" commercial and residential meters. The Smart Meters can be used by Home Area Networks (HAN) which allow customers to better control their electric usage to save money. HAN-enabled "smart" appliances can receive pricing information from the meter and adjust accordingly. Inhome displays, when installed, can show customers current consumption dollars per hour allowing for more efficient utilization of electricity. Customers will know exactly how much money they are spending to power their appliances and by spending less on electricity can spend money elsewhere to bolster the economy. As part of the Utility's Energy Optimization Initiative, the Smart Meter to Smart Grid project will further reduce our power plant air emissions. As one of the top five cleanest coal-fired 9/1/2009

T O

City of Marquette Board of Light and Power

City of Marquette and surrounding area in Marquette County

City of New Buffalo

S

City of New Buffalo

02262009

t s e

qu

e R

The E. Main Street Bridge is located within the city limits of Morenci. Main Street is a Major street within the City of Morenci and has a Naional Functional Classification of Rural Major Collector. The structure is currently open to traffic with an ADT of 2500 vehicles per day in 1997. In December of 2007, the bridge was posted at 21 tons for a 1-unit truck, 30 tons for a 2-unit truck, and 42 tons for a 3-unit truck. If the structure was closed, the detour would have a direct effect upon local industries, businesses, and commuters. An alternative route would be available for local traffic that would be an additional 3-mile route around the bridge construction, although this route cannot be used for the main detour of traffic due to the use of a local roadway in the adjacent township. Main Street outside the city limits is an "All-Season" Roadway Primary County Road. To keep truck traffic on "All-Season" roads, the detour would use the Bridge Replacement: City of Morenci E. Main State Highway system in Ohio. The shortest detour route would be 23 miles. This detour would be required for any large trucks coming into and out of the east side of th9/9/2009 Street Bridge

t i m

ub

City of Morenci

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

3/31/2010

$

5,000,000

8/31/2012

$

3,000,000

N s

d e tt

City of Morenci

Expected Completion Date

1. Berrien Street Reconstruction

This project consists of rebuilding two City blocks of north Berrien Street between U.S. 12 and Indiana Street and includes much needed storm sewer, sanitary sewer and water main work. It has been at least 60 years since any major work has been performed on this street. Plans and specifications have been prepared, the project is shovel ready. 6/1/2009

Submitted Requests - Not Approved

11/9/2009

$

.34 miles east of M156; City of Morenci, Lenawee 715,000 County

11/30/2009

$

280,000 Berrien Street

1194 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

Project Name

Project Description

2. Mechanic Street Reconstruction

Reconstruction of E. Mechanic Street from Whittaker St. east to Townsend Street, to include 700 linear feet of 12” sanitary sewer line and appurtenances, 504 linear feet of 12” sanitary sewer line and appurtenances, 330 linear feet of 36’ storm sewer, curb, gutter and sidewalks, street paving and surface restoration. Plans and specifications have been prepared, the project is shovel ready. 6/1/2009

3. Paving Projects

Repaving of the Boat Launch parking lot, Marina parking lot, the City portion of Marquette Drive, Madison Street from South Whittaker to Rose City Road, City portion of Stromer Road and miscellaneous paving. Plans and specifications have been prepared, the project is shovel ready. 6/1/2009

4. Griffith Street Storm Drain

This project consists of installing 116' of 54” storm sewer under the Amtrak Railroad tracks north of U.S. 12, extending northward to the Galien River Marsh to replace an existing 36’ storm sewer. This will provide adequate outfall drainage for the eastern portion of the City. 6/1/2009

5. Water Treatment Plant Expansion

The Water Treatment Plant expansion project will refurbish, modernize and expand an aging facility that has been in service for approximately 40 years. The facility is stressed to provide sufficient water during peak demand periods. In addition to supplying quality water to a continuing increase in seasonal and permanent population the project will benefit surrounding communities in emergency situations. The project will include “green technologies” and energy efficient designs. 9/1/2009

$

Madison/ Stromer, 525,000 etc.

11/30/2009

$

750,000

6/1/2010

$

2,500,000

Whittaker Street is the main access from the downtown area to the beach and Lake Michigan. The Whittaker Street bridge over the Galien River lies between the City and the Lake and carries over 10,000 vehicles per day. The Galien River narrows and turns as it passes under the bridge. The narrowing and alignment of the channel increase the velocity of the channel around the bridge foundations. The FHWA and MDOT required the City to complete a level II scour analysis as part of their last biennial inspection to determine if the bridge is "scour critical". The analysis indicated that the bridge is scour critcal and that scour countermeasures are required to prevent the failure of the structure. The FHWA and MDOT have required that this work be completed in 2009 or 2010. The countermeasures include armoring the channel with rip rap to prevent future scouring and failure of the structure. The loss of this structure would have a major negative impact on the jobs, economy and access in the community. 4/1/2009

6/1/2009

$

The City of New Buffalo is a boating community with an economy that relies entirely on it's access to Lake Michigan via the mouth of the Galien River. The City has a municipal marina that rents transient boat slips to encourage boaters to come to New Buffalo. Most of the users are from the Indiana and Chicagoland area and regularly come to New Buffalo to shop, eat and spend money in Harbor Country. The floodwaters from two major storms in 2008 scoured and undermined the seawalls at the City's Marina in the Galien River Channel. The large scour holes under and landward of the seawall prevent the facilities from being used due to safety. The project includes modifying the seawalls, filling the scour holes and installing rip rap to prevent future scouring in this area. Without the repairs, the City and surrounding area and businesses will see a significant decline in tourism and related jobs. 9/1/2009

12/31/2009

$

t s e

City of New Buffalo

6. Whittaker Street Bridge Scour Improvements

i m

City of New Buffalo

b u S

City of New Buffalo

02262009

7. Repair to Seawall at City Marina

O R

PP

O N

11/30/2009

u q e

R d

e t tt

D VE

385,000 Mechanic Street

A T

11/30/2009

Funding Request

Route (Infrastructure Only)

$

s

City of New Buffalo

Start Date

Expected Completion Date

Submitted Requests - Not Approved

60,000 Whittaker Street

700,000 Galien River

1195 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

Project Name

Project Description

Start Date

Expected Completion Date

8. Oselka Park-Phase II

This project consists of additional improvements to Oselka Park including new play areas, a “square court”, sledding hill, parking lot, fitness stations, irrigation system, parks maintenance building, shelter, band shell, and “green” storm water management control measures with a water garden. The Oselka Park-Phase II is the final phase of park improvements for this park with a goal of establishing a premier multipurpose and cross generational recreation destination on the south side of the City. Oselka Park is extensively used by many individuals and groups including residents and many non residents as well. 7/1/2009

9. Waterfront Transformation Project

This project consists of a complete makeover and renovation of the City's marquee water front area including river shoreline improvements ($1,445,000), Galien River shoreline connector bridge and walkway ($1,292,000), Whittaker Street & Lions Park improvements ($747,000), beach access and building improvements ($2,046,000), riverfront improvements ($1,874,000), dune access improvements ($346,000), breakwater arm access improvements ($480,000), and launch area improvements ($271,000). The City's waterfront area is one of the most heavily used waterfronts in the State of Michigan and serves a Chicago metropolitan area of more than 6 million people. 9/1/2009

10. Central Business District Infrastructure Replacement/ Upgrades

This project entails the replacement and upgrading of infrastructure in the City of New Buffalo Central Business District. The infrastructure is at least 60 years old and significantly beyond its useful life span. Infrastructure work will take place mainly on the portions of Whittaker Street and Mechanic Street located in the Central Business District and include new street, with curb and gutter, storm and sanitary sewers, burying of overhead wiring, ornamental street lighting and new streetscape design elements. 9/1/2009

O R

D VE $

1,600,000

6/1/2010

$

8,600,000 Galien River

6/1/2010

$

2,500,000 Whittaker Street

The City of New Buffalo is a boating community with an economy that relies entirely on it's marina's access to Lake Michigan via the mouth of the Galien River. The floodwaters from two major storms in 2008 discharged an immense amount of sediment to the mouth of the river which has restricted the access to Lake Michigan. This problem is compounded by the low water levels in lake Michigan and the USACOE reduced dredging of the channel. The project would dredge the federal portion of the channel to remove the shoals that prevent boats from accessing lake Michigan. The dredged material will be used to supplement a beach nourishment area established by the USACOE. Without the dredging, the City and surrounding area and businesses will see a significant decline in tourism and related jobs. 6/1/2009

7/1/2009

$

500,000 Galien River

The City of New Buffalo is a boating community with an economy that relies entirely on it's marina's access to Lake Michigan via the mouth of the Galien River. The floodwaters from two major storms in 2008 discharged an immense amount of sediment to the mouth of the river which has restricted the access to Lake Michigan. This problem is compounded by the low water levels in lake Michigan and the USACOE reduced dredging of the channel. The project would dredge the state portion of the channel upstream of the Whittaker Street Bridge to remove the shoals that prevent boats from accessing lake Michigan. The dredged material will be used to supplement a beach nourishment area established by the USACOE. Without the 12. Dredging Channel Upstream of Whittaker dredging, the City and surrounding area and businesses will see a significant decline Street Bridge in tourism and related jobs. 6/1/2009

7/1/2009

$

500,000 Galien River

d e tt

11. Dredging Federal Channel below Whittaker Street Bridge

t i m

T O

N s

st

e u

q e R

P P A

12/31/2009

Funding Request

Route (Infrastructure Only)

b u S City of New Buffalo

City of New Buffalo

02262009

Submitted Requests - Not Approved

1196 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

Project Name

Project Description

13. Jefferson Street Reconstruction

Reconstruction of E. Jefferson St. from Whittaker St to the City limits. The ambulance facility is located here and the street serves as emergency access to the Four Winds Casino. Project includes full depth milling, under drain, and 18" culvers, to improve stormwater management. 7/1/2009

14. Water Street Box Culvert

This project would install a box culvert system for Water Street at Lighthouse Creek, providing appropriate channelization of upstream waters. Current culvert is completely insufficient, as shown by September 2008 storm event which damaged upstream properties and endangered Water Street, which is the sole access to hundreds of residents and the City's water plant. 9/1/2009

City of Wakefield

402 North Street, Wakefield, Michigan 49968

Gogebic Medical Care Facility

City of Westland City of Westland

Westland Westland

Drain Disconnect Program City Sanitary Sewer CIP

Renovate Facility. Tear down old storage school building, abatement of asbestos and lead paint. Add a new wing or greenhouses with 20-28 private rooms. Build a new wing to house services currently housed in old storage school building (laundry, employee breakroom, storage, employee classroom). Bring existing rooms to current plumbing and electrical code. 8/1/2009 Disconnect 1,000 homes from footing drain discharge going into the sanitary sewer system and reduced treated cfs. 4/1/2009 Replace old and failing infrastructure of the City's sanitary sewer system 4/1/2009

T O

Westland

Increase Patrol Officers

City of Westland

Westland

Increase Patrol Vehicles

City of Westland City of Westland City of Westland

Westland Westland Westland

Increase Emergency Dispatchers In-car Computer Replacements Police Station Computer Replacements

City of Westland

Westland

Public Facility Renovations - Fire Station #5

City of Westland

Westland

Public Facility Renovations- Dorsey Center

City of Westland City of Westland

Westland Westland

City of Westland

Westland

Public Facility Renovations - Senior Center Central City Park Remediation Central City Park Concession building replacement

itt

Community Unlimited Deerfield Township Deerfield Township

Union City DEERFIELD TWP. DEERFIELD TWP.

Deerfield Township

DEERFIELD TWP.

Deerfield Township

DEERFIELD TWP.

Deerfield Township

DEERFIELD TWP.

Deerfield Township

DEERFIELD TWP.

Keinath Hwy.

Deerfield Township

DEERFIELD TWP.

Laberdee Rd.

Deerfield Township

DEERFIELD TWP.

Simpson Rd.

02262009

d e t

Community Unlimited Community Building McMahon Rd Stearns Rd.

m b u Aten Rd.

Rouget Rd. Garno Rd.

s t s

-N

e u

q e R

Building renovation to include roof, windows, and boiler system. This project will improve energy efficiency as building is over 50 years old and is owned by school system. If renovation is completed, school system will turn over to agency for the community. GRAVEL RD. TO BE PAVED FROM PIOTTER HWY. WEST TO TWP. LINE. SEALCOAT FROM LABERDEE RD. NORTH TO HOLLOWAY RD. GRAVEL RD. TO BE UPGRADED WITH TILE AND A 2INCH COMPACTED LAYER OF 411 STONE FROM COUNTY LINE RD. WEST TO LIPP HWY. GRAVEL RD. TO BE UPGRADED WITH TILE AND A 2INCH COMPACTED LAYER OF 411 STONE FROM PIOTTER HWY SOUTH TO TWP. LINE. GRAVEL RD WOULD BE UPDRADED WITH TILE AND 1 INCH COMPACTED LAYER OF 411 STONE. GRAVEL RD. TO BE UPGRADED WITH TILE AND 1 INCH COMPACTED LAYER OF 411 STONE GRAVEL RD. TO BE UPGRADED WITH TILE AND 1 INCH COMPACTED LAYER OF 411 STONE GRAVEL RD. TO BE UPGRADED WITH TILE AND 1 INCH COMPACTED LAYER OF 411 STONE

Submitted Requests - Not Approved

12/31/2009

O R

P P A

Hire 20 police officers to bolster patrol response, to have fulltime crime suppression on each shift, provide school resource officer and add additional community police officers. Purchase 10 fully marked scout cars that will be fully complimented with current electronic equipment Hire 8 emergency dispatchers that will provide service for two communities and cover both Police and Fire Departments Replace 30 In-car computers with new up to date modems Replace 30 Police station Pc's

City of Westland

S

Start Date

Expected Completion Date

6/1/2010

Funding Request

Route (Infrastructure Only)

$

500,000 Jefferson Street

$

650,000 Water Street

D VE

9/30/2010

$

9,074,960

8/1/2009 7/1/2009

$ $

10,000,000 3,000,000

4/1/2009

5/1/2009

$

2,400,000

4/1/2009

5/1/2009

$

350,000

4/1/2009 4/1/2009 4/1/2009

5/1/2009 5/1/2009 4/1/2009

$ $ $

700,000 200,000 120,000

4/1/2009

6/1/2009

4/1/2009

5/1/2009

4/1/2009 4/1/2009

5/1/2009 6/1/2009

4/1/2009

6/1/2009

4/1/2009 5/1/2009 8/1/2009

10/1/2009 10/1/2009 10/1/2009

$ $ $

350,000 500,000 14,500

5/1/2009

11/1/2009

$

67,200

5/1/2009

11/1/2009

$

18,800

5/1/2009

11/1/2009

$

31,185

5/1/2009

11/1/2009

$

37,425

5/1/2009

11/1/2009

$

31,185

5/1/2009

11/1/2009

$

49,900

1197 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Deerfield Township

DEERFIELD TWP.

Sisson Rd.

Deerfield Township

DEERFIELD TWP.

Witt Hwy.

Project Description GRAVEL RD. TO BE UPGRADED WITH TILE AND 1 INCH COMPACTED LAYER OF 411 STONE GRAVEL RD. TO BE UPGRADED WITH TILE AND 1 INCH COMPACTED LAYER OF 411 STONE

Start Date

Expected Completion Date

Funding Request

5/1/2009

11/1/2009

$

49,900

5/1/2009

11/1/2009

$

58,650

$

2,700,000

$

150,000

within 90 days of funding approval 8/30/2009

$

150,000

within 90 days of funding approval 8/30/2010

$

250,000

within 90 days of funding approval 8/30/2009

$

450,000

within 90 days of funding approval 8/30/2010

$

300,000

D VE

Eaton Intermediate School District

Eaton County

EatonWAN

Wide Area Network to connect local school district, intermediate school district, public school academies, and private schools to increase broadband internet access and within 90 days of access to instructional resources. funding approval 8/30/2010

Eaton Intermediate School District

Eaton County

EatonSIS

within 90 days of County Wide Student Information System, to improve efficiencies, reduce future cost funding approval 8/30/2009

Eaton Intermediate School District

Eaton County

EatonFIS

County Wide Financial System, to improve efficiencies, reduce future cost

Eaton Intermediate School District

Eaton County

EatonDL

Distance learning equipment will improve equity by increasing educational opportunities to rural and underserved districts

Eaton Intermediate School District

Eaton County

EatonVoIP

Purchase equipment and connect county schools to a common VoIP System will improve efficiencies, reduce future cost of maintenance and support.

EatonTech

Purchase central technology infrastructure including firewall protection, content filtering and related equipment. Central services for county schools will improve efficiencies, reduce future cost of maintenance and support.

Ecorse - Ecorse High School

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: heating, cooling and boiler upgrades, new energy efficient windows, update facilities and equipment to use modern renewable energy; upgrade/replace lighting with energy-efficient, "Green" lighting, computers and wireless technolgy in classrooms; repair damaged concrete/asphalt parking lots; repair/replace outdated plumbing systems, repair cracked/damaged walls and building foundations; replace flooring to include new carpeting and tile, painting and landscaping; ; update security cameras with computerized server and security alarm system; upgrade phone and voicemail systems; replace all A.P.C. powerclones; battery back-up for emergency lighting and I.D.F. computer servers; replace/repair site lights on building and parking areas, refinish and repair lockers; upgrade safety broadcast system/studio, replace outdated information sign; replace roll-up doors at serving areas; update pool pump controls and valves; repair exterior elevated weeptiles and walls and interior ceiling tile; replace interior/exterior doors/jambs/ swipeAugust, 2009

August, 2010

$

500,000

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: Heating, cooling and boiler upgrades, new energy efficient windows; update facilities and equipment to use modern renewable energy; upgrade/replace lighting with energy-efficient, "Green" lighting; computers and wireless technology in classrooms; repair damaged concrete/asphalt parking lots; repair/replace outdated plumbing systems, repair cracked/damaged walls and building foundations; replace flooring to include new carpeting and tile, painting and landscaping; update security cameras with computerized server and security alarm system; upgrade phone and voicemail systems; replace all A.P.C. powerclones; battery backp-up for emergency lighting and I.D.F. computer servers; replace/repair site lights on building and parking areas; refinish and repair lockers; upgrade safety broadcast system; replace roll up doors at serving areas; interior ceiling tile; replace interior/exterior doors/jambs/swipe and standard locking mechanisms; replace/repair roof drainage system, replace all cafeteria dining tables; replace/refurbish exterior fibe August, 2009

August, 2010

$

350,000

Eaton Intermediate School District

Eaton County

T O

s t s

-N

O R

P P A

Route (Infrastructure Only)

e u

Ecorse Public Schools Ecorse, Michigan

d e tt

t i m

b u S Ecorse Public Schools Ecorse, Michigan

02262009

Ecorse - John F. Kennedy Middle School

q e R

Submitted Requests - Not Approved

1198 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency

Location City or Township

Ecorse Public Schools Ecorse, Michigan

Project Name

Project Description

Start Date

Expected Completion Date

Ecorse - Grandport Ele. School

School modernization, renovation, and repair to old, damaged and inefficient building and infrasctucture to include; heating , cooling and boiler upgrades, new energy efficient windows, update facilities and equipment to use modern renewable energy; upgrade/replace lighting with energy-efficient, "Green" lighting; computers and wireless technolgy in classrooms; repair damaged concrete/asphalt parking lots; repair/replace outdated plumbnig systems, repair cracked/damaged walls and building foundatons; replace flooring to include new carpeting and tile, painting and landscaping; update security cameras with computerized server and security alarm system; upgrade phone and voicemail systems replace all A.P.C. powerclones; battery back up for emergency lighting and I.D.F. computer servers; replace/repair site lights on building and parking areas; refinish and repair lockers; upgrade safety broadcast systme/studio replace outdated information sign; replace roll-up doors at serving areas; repair exterior elevated weeptiles and walls and interior ceiling tile; replace interior-exterior doors/jambs/ swipe and standard locking mechanisms. August, 209

Ralph J. Bunche Ele. School

School modernization, renovation, and repair to old, damaged and inefficient building and infrastructure to include: heating, cooling and boiler upgrades, new energy efficient windows, update facilities and equipment to use modern renewable energy; upgrade replace/repair lighting with energy-efficient "Green" lighting; computers and wireless technology in clasrooms; repair damaged concrete/asphalt parking lots; repair/replace outdated plumbing systems, repair cracked/damaged walls and building foundations; replace flooring to include new carpeting and tile, painting and landscaping; update security cameras with computerized server and security alarm system; upgrade phone and voicemail systems; replace all A.P.C. powerclones; battery backp-up for emergency lighting and I.D.F. computer servers; replace/repair site lights on building and parking areas; refinish and repair lockers; upgrade safety broadcast system, replace rollpup doors at serving areas; interior ceiling tile; replace interior/exterior doors/jambs/swipe and standard locking mechanisms; replace gym bleachers; new safety rail in corridor around courtyard; cut and remove old large trees August, 2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

August, 2010

$

250,000

August, 2010

$

250,000

August, 2010

$

150,000

N s

Ecorse Public Schools Ecorse, Michigan

d e tt

Ecorse Public Schools Ecorse, Michigan

S

ub

02262009

t i m

Board of Education Office

t s e

qu

e R

School modernization, renovation and repair to old damaged and inefficient building and infrastructure to include: heating, cooling upgrades, new energy efficient windows, update facilities and equipment to use modern renewable energy; upgrade/replace lighting with energy-efficient "Green" lighting, computer and wireless technology; repair damaged concrete/asphalt parking lots; repair/replace outdated plumbing systems, repair cracked/damaged walls and building foundations; replace flooring to include new carpeting and tile; painting and landscaping; update security camera with computerizaed server and security alarm system; upgrade phone and voicemail systems; replace all A.P.C. powerclones; battery back-up for emergency lighting and I.D.F computer servers; replace/repair site lights on building and parking areas; upgrade safety broadcast system; replace outdated information sign; repair interior ceiling tile; replace interior/exterior door/jambs; wipe and standard locking mechanisms; repair roof draining system; ventilte bathrooms; replace all ceiling tile. August, 2009

Submitted Requests - Not Approved

1199 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Finlandia University

Hancock

Project Name

Project Description

ENSURE- Nursing Scholarships

Start Date

Expected Completion Date

Lengthy nursing program waiting lists hinder the entrance of trained nurses into the workforce. Finlandia University’s Expanding Nursing Success in Urban and Rural Environments (ENSURE) program will educate and graduate nurses quickly and efficiently. Finlandia’s nursing department’s retention, graduation, NCLEX and employment rates are above state and national averages; the university is a prime location to educate the ‘overflow’ of similar nursing programs. Funding for the ENSURE program will institute recruitment strategies in areas with ‘wait list’ nursing schools, community colleges and hospitals, award nursing scholarships to qualified students, and promote advanced nursing degrees for employed Registered Nurses. The ENSURE program will provide scholarships for students from community colleges, high schools and wait list colleges to attend Finlandia. The program will develop recruitment workshops at hospitals to generate interest in the university’s online RN-BSN Completion program, thereby following the Michigan Board of Nursing goal to increase the number of BSN educated nurses in the workforce. Finlandia will a Finlandia’s nursing department has identified areas in Michigan that have extended wa 4/1/2009 During economic downturns increased workforce training is essential for new and displaced workers, particularly in career areas that continue to grow; however, few sectors maintain strong hiring practices during troubled economic times. According to the US Labor Statistics, 30-40 percent of new jobs created in the US over the next twenty-five years will be in health care, and the Bureau of Labor Statistics projects Medical Assisting to be one of the fastest growing occupations, with an expected 30 percent increase in health care jobs through 2014. Finlandia University’s Medical Assistant (MAS) program is positioned to fill this need. In 2008, responding to requests by local health care leaders, Finlandia examined the feasibility of a MAS program. Research revealed there are no MAS programs in the Upper Peninsula of Michigan, allowing Finlandia a significant recruitment pool attracting traditional and non-traditional students, as well as displaced workers. In fall 2009, ten students will enroll in the two-year, five semester program, increasing each semester until the maximum 20 student cohort. Upon completion of the curriculum, gr In turn, these students will enter the regional and national workforce and contribute to 4/1/2009

T O

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

4/1/2011

$

508,967

4/1/2010

$

105,900

6/1/2010

$

85,000

N s

Finlandia University

Hancock

Medical Assistant Program

d e tt

Finlandia University

Hancock

02262009

b u S

qu

e R

t i m

t s e

Regional manufacturing and technology companies experiencing diminished markets are decreasing product production resulting in employee lay-offs. These companies need assistance to diversify to markets that can utilize their current production capabilities. This project will provide business, engineering, and design services to help develop ancillary markets, diversify product platforms, or commercialize business ready university research. Combining industrial design, engineering and market research will focus on companies’ core competencies, production capacity, and emerging technology. Primary information can identify primary users; expose investment needed to revamp selected equipment, personnel, or processes; create sales materials, and update company business plans to seek re-investment capital. Project partners such as Product Licensing Office of Michigan Technological University, MTEC SmartZone, The Marketing Department, Keweenaw Economic Development Alliance (KEDA), and Finlandia University, each possess singular skill components and currently work with manufacturing and technology companies in nort

Jutila Center for Global Design and Business

7/1/2009

Submitted Requests - Not Approved

1200 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Finlandia University

Project Name

District Heating for Finlandia University and Hancock, MI

Hancock

Project Description Finlandia University is ready to become a municipal model for comprehensive energy savings through interconnection of buildings and implementation of a district heating system capable to serve the downtown district of Hancock, MI. Youngstown Energy, the energy savings provider, estimates that this cutting edge system can reduce energy in excess of 50% and produce enough steam production to provide excess energy to adjacent neighborhood facilities. Youngstown Energy will first reduce energy use in each campus building, followed by the interconnection of 13 Finlandia buildings. The system can then be built out to encompass the entire community in the central business district of Hancock, firing boilers with state-of-the-art, highly efficient, low emission thermal conversion equipment while using locally supplied wood fuel that helps build jobs in the surrounding community. Youngstown Energy is considered one of the nation’s leaders in energy savings for universities and industry, historically providing guaranteed energy savings in excess o 50%. As in previous Youngstown projects, investment in equipment and operations wi

Glen Arbor Township

All 83 Counties

Glen Arbor Wastewater Collection and Land Treatment System

Lac Vieux Desert Tribe Watersmeet Twp. Mona Shores Public Schools Rosevelt Park

02262009

D VE

P P A

10,314,000

t s e

qu

e R

3,600,000

State of MI Remonumentation Program

Gogebic County is a very rural area with many of our Public Land Survey corners obliterated by logging and road construction. This program is important to our residents in that it allows for the recovery and re-establishment of many of the corners before the original evidence is lost forever. Act 345 of 1990 is titled “State Survey and Remonumentation Act” which in part states “…..to create the state survey and remonumentation fund and to provide for its use; to coordinate and implement the monumentation and remonumentation of property control If funds were made available, each County would apply for a supplemental grant to the Office of Land Survey and Remonumentation (DELEG) based on the existing formula. It is conceivable that surveyors across the state could be working on these grants with This project is immediate, it puts people to work and/or maintains existing technology based jobs; it covers all 83 counties; it utilizes an existing State program and the long term benefits are realized by every citizen of the state though decreased costs in land transfers and property line type disputes. It would also provide needed survey control 3/1/2009

12/1/2010

$

Recreation building for Tribal community

The Lac Vieux Desert Tribe would like to complete its community recreation building. The building is now a newly constructed shell that is awitinginterior work for meeting rooms, offices, a fitness area, a recreation floor. Activity equipment storage, classrooms, and landscaping with work also needed for plumbing and electrical caoability. The building servs not only the Tribe but the surrounding community of Watersmeet, MI May 1,2009

November, 2009

$2.3 million

Mona Shores Public Schools - Campbell

Installation of motion sensors in offices restrooms.

6/9/2009

$

t i m

ub

S

Route (Infrastructure Only)

N s

d e tt

Gogebic County

O R

Funding Request

4/1/2009 10/1/2011 $ Arbor design accommodates to wide ranging seasonal population variability design synergizes with 60 acres of land shared with adjoining Sleep[ng Bear National Lakeshore (SBNL) design "greening" based upon model of forerunner system in Muskegon County, Michigan where high water quality has been achieved for over 35 years by largely natural processes design sustains return on investment with conversion of water contaminants nitrogen and phosphorus into crop sales of alfalfa, corn and soy beans critically to marginally failing septic systems due to high groundwater table and ever evolving environmental and health requirements threatened and immediately adjoining Lake Michigan and/or Crystal River, nearby tributary to Lake Michigan Glen Arbor Township Sewer Feasibility Committee including retained engineering firm and county health department professional engaged for 22 months preliminary engineering complete state regulatory agenc mitigate replacement financial burden for owners of properties with challenged septics stop odors and health concerns during summer season from daily pumpings of failed sWithin 30 days of facilitate unique, cost effective/serendipitous and needed environmental accomplishm knowledge of Within two years of funds availability starting date $

T O

Glen Arbor Township, Leelanau County, Michigan

Start Date

Expected Completion Date

Submitted Requests - Not Approved

4/9/2009

30,000,000 N/A

5,200

1201 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools

Location City or Township

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

City of Norton Shores

Mona Shores Public Schools - Churchill

Installation of motion sensors in offices restrooms.

4/9/2009

6/9/2009

$

4,400

City of Norton Shores

Mona Shores Public Schools - Lincoln Park

Installation of motion sensors in offices restrooms.

4/9/2009

6/9/2009

$

12,000

City of Norton Shores

Mona Shores Public Schools - Ross Park

Installation of motion sensors in offices restrooms.

4/9/2009

6/9/2009

$

17,200

City of Norton Shores

Mona Shores Public Schools - Middle School Installation of motion sensors in offices restrooms.

4/9/2009

6/9/2009

$

12,000

City of Norton Shores

Installation of motion sensors in offices restrooms.

4/9/2009

$

12,800

City of Norton Shores

Mona Shores Public Schools - High School Mona Shores Public Schools Administration/Preschool

Installation of motion sensors in offices restrooms.

4/9/2009

6/9/2009

$

4,000

Rosevelt Park

Mona Shores Public Schools - Campbell

Replace current windows with thermo windows.

7/9/2009

9/9/2009

$

325,000

City of Norton Shores

Mona Shores Public Schools - Churchill

Replace current windows with thermo windows.

7/9/2009

9/9/2009

$

150,000

City of Norton Shores

Mona Shores Public Schools - Lincoln Park

Replace current windows with thermo windows.

7/9/2009

9/9/2009

$

175,000

City of Norton Shores

Mona Shores Public Schools - Ross Park

Replace current windows with thermo windows.

7/9/2009

9/9/2009

$

125,000

City of Norton Shores

Mona Shores Public Schools - Middle School Replace current windows with thermo windows.

7/9/2009

9/9/2009

$

100,000

City of Norton Shores

Replace current windows with thermo windows.

7/9/2009

9/9/2009

$

225,000

City of Norton Shores

Mona Shores Public Schools - High School Mona Shores Public Schools Administration/Preschool

7/9/2009

9/9/2009

$

175,000

City of Norton Shores

Mona Shores Public Schools - Ross Park

Replace/retro-fit light fixtures with energy efficient fixtures.

4/9/2009

6/9/2009

$

350,000

City of Norton Shores

Mona Shores Public Schools - Middle School Replace/retro-fit light fixtures with energy efficient fixtures.

4/9/2009

6/9/2009

$

410,000

City of Norton Shores

Replace/retro-fit light fixtures with energy efficient fixtures.

4/9/2009

6/9/2009

$

50,000

Replace/retro-fit light fixtures with energy efficient fixtures.

4/9/2009

6/9/2009

$

143,000

City of Norton Shores

Mona Shores Public Schools - High School Mona Shores Public Schools Administration/Preschool Mona Shores Public Schools Administration/Preschool

Temperature Controls and Heat Plant replacement.

9/9/2009

12/9/2009

$

750,000

City of Norton Shores

Mona Shores Public Schools - High School

Replace Domestic hot water boiler with an energy efficient boiler.

7/9/2009

7/9/2009

$

75,000

Rosevelt Park

Mona Shores Public Schools - Campbell

Replace teacher laptops

4/9/2009

4/9/2009

$

17,600

City of Norton Shores

m b u

st

O N

Replace current windows with thermo windows.

e u

eq

R d

e t t

it

s

A T

PP

O R 6/9/2009

D VE

City of Norton Shores

Mona Shores Public Schools - Churchill

Replace teacher laptops

4/9/2009

4/9/2009

$

22,000

City of Norton Shores

Mona Shores Public Schools - Lincoln Park

Replace teacher laptops

4/9/2009

4/9/2009

$

29,700

City of Norton Shores

Mona Shores Public Schools - Ross Park

Replace teacher laptops

4/9/2009

4/9/2009

$

25,300

City of Norton Shores

Mona Shores Public Schools - Middle School Replace teacher laptops

4/9/2009

4/9/2009

$

63,800

City of Norton Shores

Mona Shores Public Schools - High School

Replace teacher laptops

4/9/2009

4/9/2009

$

83,600

Rosevelt Park

Mona Shores Public Schools - Campbell

Add additional security cameras and door security

6/9/2009

8/9/2009

$

15,000

City of Norton Shores

Mona Shores Public Schools - Churchill

Add additional security cameras and door security

6/9/2009

8/9/2009

$

15,000

S

02262009

Submitted Requests - Not Approved

Route (Infrastructure Only)

1202 of 1238

Michigan Federal Economic Recovery - Request List

Submitting Agency Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools Mona Shores Public Schools

Mullett Township

Ontonagon Area School District

Ontonagon Area School District Ontonagon Area School District

Location City or Township

Project Name

Start Date

Funding Request

City of Norton Shores

Mona Shores Public Schools - Lincoln Park

Add additional security cameras and door security

6/9/2009

8/9/2009

$

15,000

City of Norton Shores

Mona Shores Public Schools - Ross Park

Add additional security cameras and door security

6/9/2009

8/9/2009

$

15,000

City of Norton Shores

Mona Shores Public Schools - Middle School Add additional security cameras and door security

6/9/2009

8/9/2009

$

37,500

City of Norton Shores

Mona Shores Public Schools - High School

Add additional security cameras and door security

6/9/2009

8/9/2009

$

52,500

Topinabee Street-scape Project

The Streetscape and Highway improvements will include approximately 11,000 sq ft o sidewalks, storm sewers, curbs/gutters and 132,000 sq ft of highway repaving. 25 lights will be installed in an area of .6 mile in length. Significant components of the plan include the reconstruction of M-27, installation of curb/gutter, streetscape and water quality improvements, water filtration vortexes and other devices to improve the quality of run-off flowing from the roadway and businesses into Mullett Lake. Sidewalks and crosswalks will create a "walkable" community encouraging interaction between trail users and the downtown area.This project will increase tourism in an area that desperately needs job creation, will protect Mullett Lake and create a pedestrian friendly community. Adjacent to the lake and running through the village is the new DNR trail that will bring more business to the area. The 2007 average unemployment rate in the County was the 7th highest in Michigan and it has lost 53.2% of its manufacturing employment. The County's median income was 22.6% lower than the State's.

8/20/2009

No

Ontonagon High School/Voc. Ed. Project 1

High School: Replacement of roof, windows, doors, damaged ceiling tiles, exit signs, gym lights, and the addition/upgrades of mechanical controls, safety, and the accessibility at kitchen. Fence around roof access locations. Vocational Ed. Bldg.: Addition of intercom and installation of a PA system in the vocational education building, new boilers, new water main. 6/15/2009

12/17/2010

$

877,654

Ontonagon High School/Voc. Ed. Project 2

High School: Replacement of lights, heat in weight room, and upgrade locker room showers, bleachers, replace damaged fence and site work, kitchen equip., and accoustics at mechanical room. Vocational Ed. Bldg.: Replacement of lighting and ceiling tile in portions of the vocational education building.

6/15/2009

12/17/2010

$

305,504

6/15/2009

12/17/2010

$

537,415

7300 feet of trunk line sanitary sewer is needed to stimulate economic growth along the Capital Ave. Corridor (M-66). This area already has water and needs sewer inorder to market it for economic growth. The Township has created a Corridor Ordinance and is in the process of creating a DDA for this area. Sanitary sewer is the catalist it needs to start the growth ball rolling. 6/1/2009

9/1/2009

$

660,000

Water Extensions

12,000 feet of water main needs to be extended in order to provide clean healthy public water to an area that is currently on wells. This would create a looped system that would provide better pressure for fire supression and water quality improvement to a low to moderate income area. 6/1/2009

9/1/2009

$

1,500,000

Capital Improvement

Our proposal would allow us to update our plant to make it a safer place for our students to work and play. Items included would be: - modernize the boys bathroom with new urinals and stalls. ($5,000) - replace upstairs hallway tiles with non-asbestus flooring. ($40,000) - expand bus garage to allow all three of our buses shelter from snow and ice. ($30,000) - repair and reseal roof of building. ($10,000) - update gym and equipment ($2,000) June, 2009

August, 2009

$

87,000

Topinabee, Mullett Township, Cheboygan County

Ontonagon, Michigan 49953

Ontonagon, Michigan 49953 Ontonagon, Michigan 49953

Pennfield Township

Pennfield Charter Township, Calhoun County

Pennfield Township

Pennfield Charter Township, Calhoun County

e t tt

i m

02262009

s t s

e u

eq

Replacement of one boiler with a Biomass Boiler.

Submitted Requests - Not Approved

O R

D VE

Route (Infrastructure Only)

P P A

-N

R d

Capital Ave. Corridor Sewer Extension

ub

Big Bay, Powell Twp.

T O

Ontonagon High School Project 3

S Powell Township School District

Project Description

Expected Completion Date

Highway M-27

1203 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Presbyterian Villages of Michigan

Presbyterian Villages of Michigan

Presbyterian Villages of Michigan

Presbyterian Villages of Michigan

City of Royal Oak

Blackman Township

City of Kalamazoo

City of Alpena

Project Name

Village of Royal Oak

Village of Spring Meadows II

PVM was awarded a $3.5 million HUD 202 Capital Advance to develop 40 senior apartment units and common elements on the existing Village of Spring Meadows adjacent to PVM's Low Income Housing Tax Credit cottage development of 81 units. The project will serve very low income seniors. The project's purpose could be expanded to create space to accommodate PVM's efforts to provide home and community based services and wellness programs for seniors in the Blackman Township and the Jackson area. Additionally, the funding would provide investments in Green design and technology. The project will create 35 construction jobs and 3 sustaining jobs/10 with addional funding. 7/9/2009

Village of Kalamazoo

d e tt

t i m

Alpena Village

S

Fort Gratiot Township

02262009

Start Date

A mixed-income, infill, senior housing project located near senior friendly amenities. The developers have site control. The project has 110 apartment units in a 3-story building, 37 cottage units, and 5 single family residential lots. Project financing includes MSHDA TEAM Tax-Exempt Direct Lending and an allocation of Low Income Housing Tax Credits which will require 70% of the units be permanently reserved for seniors within the 50% and 60% Area Medium Income (AMI) levels (between $24,450 and $33,540) and the balance rented to seniors at market rate rents with incomes abovev $33,540. As a condition of the LIHTC allocation, the project's Regulatory Agreement requires rent restricted units be offered for 45 years. The project will require $4 million in HOME or other funds. Green energy efficient technology is being applied. The project will create 60 construction jobs and 5 sustaining jobs. 7/9/2009

ub

Presbyterian Villages of Michigan

Project Description

Village of Lake Huron Woods

Expected Completion Date

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

12/10/2009

$

2,500,000 NA

9/10/2009

$

1,000,000 NA

PVM was awarded a $3.5 million HUD 202 Capital Advance to develop 38 senior apartment units and common elements on a new site. The project will serve very low income seniors. The project's purpose could be expanded to accommodate PVM's efforts to provide home and community based services for seniors and wellness programs in the Kalamazoo area. Additionally, the funding would provide investments in Green technology and design. The project will create 35 construction jobs and 3 sustaining jobs/10 with the additional funding. 9/9/2009

11/10/2009

$

1,000,000 NA

PVM and its co-general partner Lutheran Homes of Michigan are developing Alpena Village. The Village consists of a 48-unit Low Income Housing Tax Credit senior apartment complex and a 52 unit senior housing condominium association. The apartment complex was completed in July 2008 and the first 7-unit condominium apartment building was completed in February 2009. The condominium development is heated and cooled using geothermal technology. The project funding request would assist in the development of a 4000 SF community center residents, the partners home and community based services, and the local senior center offices and clientele The funding would support Green technology, a community asset, create 25 construction jobs, and 8 to 10 sustaining jobs. 7/9/2009

3/10/2009

$

880,000 NA

PVM is general partner of The Village of Lake Huron Woods, LDHA, LP, a senior living community of 12 cottages and 104 apartments, of which 65 units are rent restricted tax credit units. There is a high demand for a dedicated Alzeimers/memory loss program in the market area, and the Village is planning the conversion of excess capacity to assisted living and memory loss programming. The project funding request would assist in the capital costs for the conversion, create 20 construction jobs and 40 sustainable jobs. 6/9/2009

11/10/2009

$

750,000 NA

T O

s t s

-N

e u

q e R

Submitted Requests - Not Approved

1204 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Presbyterian Villages of Michigan

Presbyterian Villages of Michigan

Presbyterian Villages of Michigan

Presbyterian Villages of Michigan Presbyterian Villages of Michigan

Redford Township

City of Westland

City of Pontiac

Project Name

Village of Redford

Village of Westland

PVM owns The Village of Westland, a continuing care retirement community. The project would fund the demolishen of 25 year old manufactured housing buildings currently vacant. The demolish make room for a replacement facility that could include a HUD/FHA financed senior housing program, wellness progamming, and an area for locating PVM's home and community based services hub. The demolish project will create 10 construction jobs, and will recycle all valuable materials. 7/9/2009

Village of Oakland Woods

PVM affilates own The Village of Oakland Woods, a senior living community for verylow, low and moderate income seniors in a HUD and LIHTC developments, with a community center. The project would supplement the funding of phase II B construction of the LIHTC development, consisting of 44 senior cottages for persons in the range of 40 and 50% of area median incomes. The project would create 30 construction jobs and 2 sustaining jobs. 7/9/2009

T O

PVM Villages State-wide

PVM's 23 State-wide Villages

b u S

02262009

d e t

Villages of Redford, Village of East Harbor, Village of Westland, Village of Rosebush Manor, and Perry Farm Village.

s t s

11/10/2009

-N

D VE $

4,500,000 NA

11/10/2009

$

500,000 NA

11/10/2009

$

1,500,000 NA

O R

P P A

Funding Request

Route (Infrastructure Only)

The renovation and reuse of 30,000 square fee of existing space on the City of Detroit's East Side to provide a satelite site for the Center for Senior Independence's Program for All-Inclusive Care for the Elderly (PACE) program serving over 300 seniors, generally of very low to low incomes, needing long term nursing care. All care provide through the transportation to/from the PACE site and home care. Medicare/Medicaid sharing national primary care program. The PACE program provides for all of the seniors' health care needs to allow them to live within their home and deflect them from traditional institutional nursinig care and a drain on the State's Medicaid budget. Net job creation would be 30 contruction/renovation jobs and 70 sustainable full time equivalant positions. Will utilize Oakland University School of Nursing. 7/9/2009 The deployment of energy efficient systems and weatherization at 23 PVM Villages state-wide. 9/9/2009

3/10/2009

$

2,500,000 NA

9/12/2009

$

3,000,000 NA

The deployment of Health Information Technology in the form of Electronic Medical Records (EMR) for all Assisted Living and Skilled Nursing in 5 PVM Villages. Assumes a five (5) year project span including a two (2) year deployment period for five (5) total villages serving two-hundred-forty (240) AL and one-hundred-eighty (180) SNF residents. Includes software, hardware, external consulting/training services and internal technical and development staffing. Net job creation would be 5.0 full time equivalant positions in first two (2) years and 2.0 FTEs for each of three (3) following years, utilizing Oakland University Nursing School. Additional benefits include complete conversion to EMR/EHR/HIT platform across AL and SNF areas in current PVM system; substantial training/improvement in the deployment, support and use of technology as it relates to EMR/EHR/HIT for approximately one hundred (100) Direct Care Staff and eight (8) Technical Support Staff; and, the establishment of the HIT infrastructure to support PVM's growth in Medicare certified home health and Hospice care delivery. 7/9/2009

11/14/2009

$

1,300,000 NA

e u

q e R

City of Detroit

Center for Senior Independence/Henry Ford Health Systems (PACE), a Joint Venture of PVM and HFHS

Redford Township, Chesterfield Township, City of Westland, Rosebush, Harbor Springs, and Southfield

Start Date

PVM owns The Village of Redford, a continuing care retirement community where the State's first Green Houses for nursing care opened in 2006. PVM needs to further the site master plan by demolishing 35 year old buildings and replacing them with two additional Green Houses. Additionally the existing institutional nursing center would b converted to assisted living, phyiscal and occuptional therapy, and wellness programs The project will create 45 construction and renovations jobs and 50 sustainable jobs. 7/9/2009

tt i m

Presbyterian Villages of Michigan

Project Description

Expected Completion Date

Submitted Requests - Not Approved

1205 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

St. Clair County

Suttons Bay Public Schools Suttons Bay Public Schools

Tuscola County

Project Name

Project Description

Start Date

Abatement and Demolition of old YMCA Building

The old YMCA is not suitable for renovation as there is asbestos, lead, etc. which would have to be abated prior to any renovation projects. The County has conducted an environmental assessment of the building which estimates that abatement would cost $350,000 and demolition/site improvements would cost $650,000. The other environmental issue is that this building is located less than 200 feet from the St. Clair Early Summer River which feeds into the Great Lakes. 2009

Suttons Bay, MI

School Upgrade to LEEDS Silver level

The proposed envelope improvements would include increased insulation, new roofing, and increased or new energy efficient windows. Interior finish improvements would include new ceilings, as well as low emitting paints and floor finishes. Additionally the durability factor of floors would be improved reducing maintenance and life-cycle costs. The proposed upgrade for this area of the school would include replacement of inefficient light fixtures with much improved energy efficient fixtures and the addition of occupancy sensors to optimize energy savings. Plumbing fixtures would be replaced with dual flush fixtures and automatically controlled fixtures to significantly reduce water consumption. Additionally, the classroom heating/ventilating units would be replaced to improve energy and provide fresh air exchange. A new direct digital control (DDC) system is proposed to reduce energy and improve indoor air quality. Upgrading the fire alarm system is proposed to improve life safety and meet current State building codes. 6/8/2009

Suttons Bay, MI

WiFi Connectivity

Equip each classroom with multi-media and WiFi connections

New Water Distibution System

Many wells in Wisner Township are not sources of potable drinking water. Residents haul water themselves or hire water hauled from neighboring Hampton Township in Bay County. Feasibility studies have been prepared by two engineering firms for the construction of a new water distribution system in Wisner Township along the M-25 corridor going North toward Saginaw Bay. System consists of eight inch diameter pipes and hydrants in road right of way. Project is 5.77 miles long and serves 234 parcels. Household income in Township is below poverty level. This project will bring safe, affordable drinking water to citizens of Wisner Township. 6/1/2009

Port Huron, MI

Wisner Township

Union City Friends of the Library

Union City

Dearth Library

Van Buren County

Paw Paw, Michigan

Courthouse Project

Van Buren County

Paw Paw, Michigan

Van Buren County Village of Augusta

Paw Paw, Michigan Augusta MI

Village of Augusta Village of Augusta Village of Augusta

Augusta MI Augusta MI Augusta MI

Village of Augusta Village of Augusta Village of Augusta

Augusta MI Augusta MI Augusta MI

02262009

u S

bm

it

New Jail Windows

New Jail Boilers Washington Street Bridge Water System Improvements Skid-Steer Loader Sidewalks Four Street Reconstruct Boat Launch River Trail

Funding Request

1,000,000

8/31/2010

$

5,881,153

8/31/2009

$

545,000

6/1/2010

$

2,200,000

Complete construction of new library with a total available space of 6000 square feet, with 3000 square feet on two levels. The top level will serve as the library and the basement will serve for community use and storm shelter. The facility is planned on a brownfield or contaminated site wiith phases of assement completed and approved by the Department of Environmental Quality. 4/1/2009

1/1/2010

$

580,000

Purchase vacant grocery store and convert into County Courtrooms and Offices

8/1/2009

10/1/2010

$

3,772,400

Replace 47 year old windows that nolonger provide any reasonable protection from outside elements; new window will save the county $20,000 in energy costs.

8/1/2009

11/30/2009

$

100,800

6/30/2009 10/1/2009

$ $

36,000 440,000

11/30/2009 7/1/2009 9/1/2009

$ $ $

871,000 25,000 155,000

8/1/2009 9/1/2009 10/1/2009

$ $ $

197,000 15,000 183,000

T O

s t s

eq

P P A

-N

6/8/2009

R d

Replace 20 year old boiler which should reduce energy consumption by 20% annually 6/1/2009 Washington Street Bridge will be replaced.(Local Bridge Application 8/1/2009 Replace 4" mains and valves with 8" mains and eliminate deadends (Water System Reliability Study P.12) 8/15/2009 Replace aging snow removal, mowing, and earth moving equipmen 6/1/2009 Install new and replace old sidewalks (Safe Routes, Non Funded 6/1/2009 Reconstruct Portions of Fayette, Cherry, Washington, and Chestnut streets (5 Year Highway Plan) 6/1/2009 Construct a boat launch on Kalamazoo River (Design Report P.19 6/1/2009 Construct trail along Kalamazoo River (Design Report P.25) 6/1/2009

Submitted Requests - Not Approved

O R

Route (Infrastructure Only)

D VE

6 months from start date

$

e u

e t t

Expected Completion Date

1206 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Village of Augusta

Village of Jonesville

Village of Jonesville

Augusta MI

Village of Jonesville

Village of Jonesville

Project Name Trout Habitat

Project Description Start Date Improve Augusta Creek within Village to improve Trout Habitat (Design Report P.42, Drain Reroute Estimate) 5/1/2010

10/1/2010

Project Adequate Fire Suppression

Replace old deteriorating 4" water main with new 8" water main to ensure adequate fire suppression in conjunction with the reconstruction of Grant Street & Murphy Street. The water main improvement increases free flowing water that provides a benefit to the whole system.

9/9/2009

Project Repair Existing Sewer Infrastructure

The majority of the Jonesville sanitary sewer system was installed in the late 1960's with some of the system dating back to the early 1900's. The Village is not equipped to properly maintain the system as current sewer cleaning equipment is a 1978 model that is prone to breakdowns. It is prudent to hire a contractor to properly clean and televise our system. This would allow us to properly plan for sewer improvement and maintenance projects. This would also identify inflow and infiltration sources that affect our treatment process and total capacity. 4/9/2009

Project Replace Existing Iron Removal Plant Components

The iron removal plant was constructed in 1970 and the high service pumps are now 39 years old. New high service pumps would be more energy efficient and less susceptible to breakdown. New pumps would also be equipped with soft start electronics that would allow the pumps to start and ramp up to full speed, eliminating the initial shock to the water distribution system and spike in electrical consumption. In addition the aerator, which oxidizes the iron in the water so that it can be removed in the pressure filters will need to be replaced as its redwood box technology has been long outdated. 4/9/2009

Project NPEDS Compliance at the Waste Water Treatment Plant

The waste water treatment plant has been experiencing periodic spikes of ammonia in its final effluent. After professional review of the situation, the problem is caused by short-circuiting in the trickling filter pump station wet well and trickling filter tower effluent channel, and that the recycle flow system is not providing adequate flow to recycle on a continuous basis. Improvements to ensure compliance with NPEDS include re-piping the primary effluent into the trickling filter wet well, installation of a weir baffle in the tower effluent trough, and the installation of a float valve to mechanically control the recycle flow. 5/9/2009

5/9/2009

Village of Jonesville

Village of Jonesville

Village of Jonesville

Village of Jonesville

Village of Jonesville

Village of Jonesville

Village of Jonesville

Village of Jonesville

Village of Jonesville

S

Village of Jonesville

Village of Manchester Village of Manchester

02262009

$

D VE

6/9/2009

$

130,000

7/9/2009

$

225,000

8/9/2009

$

70,800

Reconstruction of Clinton Street, Fayette Street, and Crest Lane. Reconstruction to consist of removing the old street, adding new storm sewer, sanitary sewer, water main, new service leads, concrete drives, sidewalk, and curb and gutter. East Street itself was totally reconstructed with local funds totaling in excess of $700,000 in 2008. 6/9/2009

11/9/2009

$

2,764,800

Reconstruction of Jermaine Street. Reconstruction to consist of removing the old street, adding new storm sewer, sanitary sewer, water main, new service leads, concrete drives, sidewalk, and curb and gutter.

11/9/2009

$

2,952,200

Case & Craig Streets Resurfacing

Resurfacing of Case & Craig Streets. Resurfacing would include pulverizing the existing surface, installing new water main and water services, re-grading the recycled materials, and repaving the road with four inches of hot mix asphalt. 6/9/2009

8/9/2009

$

721,050

Energy efficiency consolidation of Services; Village Hall Renovation

Renovation of Village Hall, a historic structure built in the 1865. The project would allow for consolidation of services, provide LEED certification and the use of alternative energy components. The work generally involves installation of an elevator, renovation of the 3,000 s.f. second floor and 3,000 s.f. third floor.

7/2/1905

$

1,473,000

Ford Dam Repairs

Existing Dam was built in conjunction with the current municipal building in 1940 and is need of repairs. Work would entail repairing spalled/cracked concrete repairs, replacement of retaining wall caps, control joint repair, and make sluiceway gates operational. 7/1/2009

11/30/2009

$

475,000

t s e

O N

u q e

R d

e t tt

East Street Thoroughfare Project

s

PP

i m

Jermaine Street Reconstruction

Submitted Requests - Not Approved

O R

6/9/2009

7/9/2009

Route (Infrastructure Only)

33,000

2,507,450

ub

Village of Jonesville

Funding Request

$

A T

Village of Jonesville

Expected Completion Date

1207 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Village of Manchester Village of Manchester

Furnace Street Bridge

This bridge has been closed for twenty years due to lack of funds to replace. This would allow for construction of a new bridge and approaches. This would improve traffic circulation and help relieve congestive pressure at our M-52 and Main Street intersection in town.

Village of Manchester Village of Manchester

Sewer Repairs

This project would replace 1650 of problematic sewer lines in need of repair. It would also upgrade WWTP with new valves, actuators, and control panels at the plant. 7/1/2009

Village of Manchester Village of Manchester

Water System Repairs

Project entails looping of 7625 feet of water main to ensure fire pressures, water quality and reliability. It also includes work to the water plant and water tower.

Municipal Building HVAC Repair

Our current municipal building which houses the Village Hall, District Library, Police, Building Inspection Office, Senior Citizen Offices and Social Service Training Office is in the need of replacing its twenty five year old rooftop heating and cooling units which would be much more energy efficient and improve the health of the building. 7/1/2009

Industrial Area Road Repairs

The current roadway system around our industrial facilities are in need of repairs. This would allow us to pulverize or mill, reshape and replace the asphalt on 8,837 linear feet of roadway surface.

7/1/2009

Civic Center energy retrofit

Energy retrofit of Civic Center Building to include interior lighting replacement, insulation and energy efficient window replacement following State Energy Office Aud report recommendations. 6/1/2009

Public Services Building energy retrofit

Energy retrofit of Public Services Building to include interior lighting replacement, insulation and energy efficient window replacement following State Energy Office Aud report recommendations. 6/1/2009

Village of Manchester Village of Manchester

Village of Manchester Village of Manchester

Village of Milford

Village of Milford

Village of Milford, MI

Village of Milford, MI

Spring 2010

Fall 2011

11/30/2009

O R

Spring 2010

P P A

Fall 2011

$

Territorial to 1,400,000 Furnace Street

$

Wolverine & 525,000 Madison

D VE $

1,400,000 Misc. Lines in town.

225,000

11/1/2009

$

Torrey, Division, Parr, Hogan and 400,000 Duncan Streets.

12/1/2009

$

300,000

12/1/2009

$

200,000

12/1/2009

$

200,000

11/1/2009

$

150,000

12/1/2009

$

200,000

12/1/2009

$

200,000

12/1/2009

$

300,000

12/1/2009

$

400,000

10/1/2009

$

60,000

6/1/2009 6/1/2009 6/1/2009 6/1/2009

6/1/2010 10/1/2009 12/1/2009 12/1/2009

$ $ $ $

600,000 70,000 600,000 200,000

7/1/2009

11/1/2009

$

300,000

Replacement of water system control valves and fire hydrants 6/1/2009 Construct water system loop connection between two unconnected portions of system 6/1/2009 Oakland Street Water system loop connection to create increased pressure, reliability and safety. Replacement of sanitary sewer lift station grinder pumps to improve reliablity and Sanitary Sewer pump replacement energy efficiency 6/1/2009 Old Plank Sanitary sewer extension Extension of sanitary sewer into area without sewe 6/1/2009

10/1/2009

$

200,000

6/1/2010

$

500,000

12/1/2009 6/1/2011

$ $

100,000 4,000,000

T O

N s

st

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Village of Milford Village of Milford Village of Milford Village of Milford

Village of Milford, MI Village of Milford, MI Village of Milford, MI Village of Milford, MI

Liberty Street RR grade separation Enclose Civic Center Drainage Ditch Skate Park Sanitary Sewer Manhole Repair

Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Sanitary Sewer Rehabilitiation Replacement of valves and fire hydrants in water supply system

Village of Milford

Village of Milford, MI

Village of Milford Village of Milford

Village of Milford, MI Village of Milford, MI

e u

tt i m

b u S

d e t

q e R

Create railroad grade separation to accommodate access to Central Park from downtown and provide recreational trail access to park and downtown. Enclose open drainage ditch to prevent drowning hazard Construct skate park within Village park system Repair of deteriorating, leaking and unsafe sanitary sewer manholes In-place sewer relining of older sanitary sewer lines. Locations have been identified through in-line TV monitoring already complete.

Submitted Requests - Not Approved

11/30/2009

Funding Request

Route (Infrastructure Only)

$

Energy retrofit of Wastewater Treatment Building to include interior lighting Wastewater Treatment Facility Building replacement, insulation and energy efficient window replacement following State energy retrofit Energy Office Audit report recommendations. 6/1/2009 Replace deteriorating and leaking roof with green, energy efficient roof with new Replace Police Department Roof access. 7/1/2009 Replace Wastewater Treatment Plant Replace deteriorating and leaking roofs on two buildings with green, energy efficient Buildings Roof roofs 6/1/2009 Replace deteriorating and leaking roof at Department of Public Services Building with Replace Department of Public Services Roof green, energy efficient roof 6/1/2009 Replacement of Civic Center exterior lighting with energy efficient lighting, includes Replacement of Civic Center exterior lighting replacement of deteriorated poles and fixtures 6/1/2009 Replacement of Downtown exterior lighting with energy efficient lighting using existing Replacement of Downtown exterior lighting poles and fixtures 6/1/2009 Complete bike trail connection through downtown offering increased recreational Bike trail connection activies and non-motorized transportation. 6/1/2009

02262009

Expected Completion Date

1208 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Village of Milford

Village of Milford, MI

Village of Milford

Village of Milford, MI

Project Name Wastewater treatment plant auto control project Wastewater treatment plant sludge handling addition

Village of Milford

Village of Milford, MI

New well development

Project Description

Expected Completion Date

Start Date

Complete computer control of wastewater treatment plant 6/1/2009 Create additional capacity for sludge storage and handling to accommodate increased demands increasing efficiency. 6/1/2009 Creation of second well water source to backup existing contaminated well water source 6/1/2009

PP

Village of Newberry

Village of Newberry

Phase 3, Water Distribution Improvements Water System Improvements (To fulfill a DEQ Definced definency) Multi-Purpose Center in Downtown Newberry/ Community Action Agency Community Action Agency Building Match for the Construction of

Village of Newberry

Phase 3, Water Elevated Storage Tank Painting and Re-Construction

Water System Improvements (To fulfill a DEQ Definced definency)

Village of Newberry

Municipal Building with Department of Public Works garage, Council/Board Meeting room, offices.

Energy efficient/green Municipal Building with attached Public Works garage all ADA accessible Sept. 30, 2009

Village of Newberry

Village of Newberry

Village of Newberry

Village of Newberry

Village of Newberry

Rehabilitate downtown apartments

900,000

6/1/2009

Sept. 30, 2009

Sept. 30, 2009

11/14/2010

$

Charles, Robinson, Victory Way, Washington, Sherman, Railroad Street, A, B, C & D 4,000,000 Streets & M123.

12/31/2009

$

1,700,000

11/14/2010

11/14/2010

11/14/2010

$

At the Municipal / Water and Light 150,000 Property

$

At the Municipal / Water and Light 2,746,200 Property

$

At the Municipal / Water and Light 25,000,000 Property Newberry downtown business 1,000,000 district

$

70,000

10/9/2009

$

4,000,000

5/9/2009

10/9/2009

$

1,000,000

Elm Street Truck Route

Reconstruction of Elm Street and replacement of the 80 year old sewer trunk line under said street. Elm Street would provide a truck route diverting heavy traffic from the school bus route and making it safer for school children to walk to school 6/9/2009

10/9/2009

$

925,000

Silver Creek Truck Route

Reconstruction of Silver Creek extending the Elm Street truck route and diverting heavy traffic from the State Street business route. Silver Creek would provide a connection to the Elm Street truck route.

6/9/2009

10/9/2009

$

32,900

Wasterwater trunk line and lift station from North State Street to properties west of M37

Expansion of wastewater treatment service to avoid installation of individual septic systems on property that has been annexed into the Village of Sparta from Sparta Township.

7/9/2009

11/9/2009

$

1,500,000

Sparta Foundry

Demolition and environmental clean up of Sparta Foundry. The site has been abandoned by the previous owner leaving a dangerous and contaminated property site.

4/9/2009

6/9/2009

$

3,200,000

Village of Sparta

Village of Sparta

Water Treatment Plant Improvements

t i m

b u S

Removeal of existing HMA overlay, place watr proof membrane and HMA overlay, overlay approach pavement with HMA, construct expansion joint over abutments remove existing guardrail place bridge railing, anchorage and end treaqtments, grout rip rap for sour protection 5/9/2009 Replace the current bridge with ADA compliant bridge. This would allow better access to Balyeat Park and the trail system we would like to install. 4/9/2009 Expansion of current wastewater treatment plant to allow more capacity and ensure compliance with DEQ permits. 1/9/2009

eq

R d

e t t

Sept. 30, 2009

D VE

7/9/2009

Wastewater Treatment Plant Expansion

02262009

$

185,000

Village of Sparta

Village of Sparta

700,000

$

Village of Sparta

Village of Sparta

$

10/9/2009

Balyeat Pedestrian Bridge

Village of Sparta

6/1/2010

$

Village of Sparta

Village of Sparta

e u

100,000

11/14/2010

Village of Sparta

Village of Sparta

O N

To provide business owners with funding to convert outdated apartments to energy efficient units that are ADA acessible.

Loomis Street Bridge

Village of Sparta

A T

To provide customers with an efficient energy source not dependent of deisel fuel.

Village of Sparta

Village of Sparta

Sept. 30, 2009

Mini-Nucular Electric Generator

Village of Sparta

Village of Sparta

st

s

$

O R

Village of Newberry

Village of Newberry

12/1/2009

6/1/2010

Village of Newberry

Funding Request

Installation of treatment facility to remove iron and manganese while continuing to soften raw water before distributing the finished produce to Village customers.

Submitted Requests - Not Approved

Route (Infrastructure Only)

1209 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Sparta

Village of Sparta

Wakefield Memorial Building Foundation client of Myefski Cook Architects Wakefield/Wakefield

Project Name

Project Description

Start Date

Remodel the current building to include all Village of Sparta Offices, an Economic Development Department, Sparta Township Offices, the Sparta Township Historic Museum, an auditorium and public gymnasium. This will encourrage interRemodel Central Elementary School Building governmental projects and make it easies for residents needing to visit both to a Town Hall municipalities.

6/9/2009

This project is being developed by a non-profit entity that plans to donate the completed facility to the City of Wakefield. The proposal is to demolish the existing, dilapidated, former Veteran’s Memorial Building to build a new 34,000 sq. ft. state-ofthe-art community center that is equally inspirational as the original. This unique piece of architecture will celebrate the heritage of the Wakefield community while looking to the future in its use of technology for aesthetics and environmental sustainability. Plans include reclaimed elements from the existing structure, integrated into the various functions; Theater, Great Hall Gallery, Library, City Hall & Council Chamber, and Physical Fitness Facility. Several spaces will be designed with de-mountable or movable walls to be multi-purpose for a variety of public and private functions large and small, such as a voting center, lectures, local weddings & other town gatherings. The Great Hall Gallery will be used for artwork and regional and local interpretive displays. Special emphasis is being focused on using environmentally sustainable ma4/30/2009

T O

Wakefield Memorial Building

Expected Completion Date

12/9/2009

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE $

4,000,000

7/1/2010

$

12,323,440 N/A

The Lighthouse for Men was created to equipt former prisoners with the tools they need to become valued members of their communities. The Lighthouse looks like an old farmhouse but in actuality is a 16 bed residential facility located on Waverly Road on the south side of the City of Lansing, Michigan. The program is committed to providing services that include case management, work readiness, housing and supervision. Volunteers and mentors work directly with the men. Participants are required to attend weekly classes in image building, avoiding criminal and addictive thinking patterns, addiction recovery groups as well as growth in spiritual enlighten. A very special opportunity for the men is a paid employment opportunity at the programs micro business enterprise named Beacon Tables. At Beacon Tables, Lighthouse participants manufacture picnic tables to be sold for private and government use. The program works closely with Eaton and Ingham county and federal parole agents, local churches, local social service programs, MPRI, Capital Area Michgan Works, American Red Cross, United Way, Gateway Community Services, Community Mental Ongoing

Ongoing

$

63,659

A Child Is Missing assists law enforcement in the first crucial hours of the disappearance a child, elderly person (Alzheimer's/dementia), all persons with cognitive impairment, those afflicted with autism, disabled persons, and college students missing on campus. Through the use of a rapid response emergency telephone system, A Child Is Missing can place 1,000 alert phone calls in one minute by use of satellite imagery and computer mapping. Immediately

One year from approval.

$

50,000

N s

t s e

Willing Vessels Ministry International, Inc.

3830 S. Waverly Road, Lansing, Michigan 48911 Lighthouse for Men

A Child Is Missing

Available to all municipal, state, and federal law enforcement agencies serving the State of Michigan. A Child Is Missing Alert Program - Michigan

b u S 02262009

R d

e t tt

i m

u q e

Submitted Requests - Not Approved

1210 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Aegis Bleu, LLC

Akron Township

Akron Township

Bay Area Family Y

Village of Caro

State Wide

Akron Township

Akron Township

Project Name

Michigan Critical Infrastructure Assessment

Sunset Bay Marina Dredging

Over the last several years, Sunset Bay Marina and the entire Saginaw Bay Region have been plagued with low water levels, which has had an extremely negative impac on all related activites. Local, State, and Federal officials have been involved in developing a plan to alleviate this barrier to tourism, the benefits to the economy of tourism and the dollars it brings to the local area bringing more jobs and economic development. 4/5/2009

Sunset Bay Marina Dredging

Over the last several years, Sunset Bay Marina and the entire Saginaw Bay Region have been plagued with low water levels, which has had an extremely negative impac on all related activites. Local, State, and Federal officials have been involved in developing a plan to alleviate this barrier to tourism, the benefits to the economy of tourism and the dollars it brings to the local area bringing more jobs and economic development. 4/5/2009

The current Y facility has served the community well over its 54-year old history hosting thousands of people. Unfortunately, the age, design, lack of adaptability and accessibility of the facility makes it difficult to respond and meet the interests and needs of the youth, adults, and families of the 21st Century. After extensive research and planning, the Y Board has determined that replacing the current facility with a new Y facility is the best investment for the organization and the community. The Bay Area Family Y has embarked on a $15.5 million fund raising campaign to build a new stateof-the-art silver LEED certified Y facility. We plan to begin construction in the summer of 2009 with completion slated for 2010. In addition to allowing the Y to develop the programs and services necessary to carry out its mission in Bay County, this facility will be the catalyst for an adjacent site to be developed currently called “Uptown at River’s Edge,” a 40-acre site on the eastern shore of the Saginaw River that is being prepared by the City of Bay City for private and public development, including busines 8/15/2009

t i m

111 Madison Avenue, Bay City, MI 48708 Dow Bay Area Family Y

ub

S

Parking Lot Stabilization

Village of Caro

Village of Caro

Install Ultra Violet Disinfection System

Village of Caro

Village of Caro

Water Distribution System Upgrade

02262009

Start Date

Enhancing the security of major Michigan ports and key Michigan infrastructure to improve homeland security, increase international trade and commerce, preserve tourism and create jobs. Michigan represents the nation’s largest crossing with Canada along with key shipping ports for trade and commerce. In coordination with local law enforcement and Michigan State Police the VASST vulnerability assessment tool will assess multiple facilities and consolidate information into a centralized reporting engine. The reporting engine allows for system wide risk based assessments along with comparative analysis. 85 percent of Michigan’s critical infrastructure is managed by the private sector presenting significant risk in the government’s ability to comply with Congressionally mandated PCII program that increases government access to Critical Infrastructure Information. VASST is based on industry and DHS best supported by leading security practitioners from across the US. Traditional security assessment tools take months to compile reporting and are 30 Days From prone to user error. Aegis Bleu’s VASST (Vulnerability Assessment Security Survey T Receipt

d e tt

Village of Caro

Project Description

A T

e u

st

q e R

s

Expected Completion Date

PP

O N

In order to provide parking for businesses presently limited in customer parking, and old parking lots to be reconstructed and enchanced for additional parking. Is expected to help improve access to about a dozen businessess helping to stabilize their customer base. ASAP Install a ultra violet disinfection system for the waste water treatment (wwtp) plant to replace chlorine and sulfur dioxide treatment of waste water. Improvements were originally in a waste water treatment plant bonded renovation project, however was deleted because of cost constraints. Improvements would increase employee safety and reduce environmental impacts because of reduction of chemical usages. ASAP Replace select six inch diameter pipes in road right of way with twelve inch pipe to improve water distribution and fire fighting capability. Fall of 2009

Submitted Requests - Not Approved

O R

Funding Request

Route (Infrastructure Only)

D VE

12 months after contract award

$

700,000

9/1/2009

$

175,000

9/1/2009

$

175,000

12/31/2010

$

15,500,000 N/A

8/9/2009

$

Reduce parking pressure on M-81 425,000 in downtown.

8/9/2009

$

300,000 None

Fall 2011

$

10,636,775 None

1211 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency Village of Caro

Village of Caro

Water Distribution System Upgrade

Village of Caro

Village of Caro

Water Distribution System Upgrade

Project Description Start Date Replace two inches or less diameter pipes in road right of way with eight inch pipe to improve water distribution and fire fighting capability. Fall 2009 Replace four inch in diameter pipes in road right of way with eight and twelve inch pipe to improve water distribution and fire fighting capability Fall 2009

Arts Center Rehabilitation

Rehabilitate downtown church that is presently in jeopardy of deteriorating because of structural and drainage problems. Building presently used for performing arts center and art classrooms. Building lifespan will be limited without major renovation including drainage work, electrical upgrade and structural reinformcement. Fall 2009

Parking Lot Stabilization

In order to provide parking for businesses presently limited in customer parking, and old parking lots to be reconstructed and enchanced for additional parking. Is expected to help improve access to about a dozen businessess helping to stabilize their customer base. ASAP

Village of Caro

Village of Caro

Village of Caro

Village of Caro

Project Name

Village of Caro

Village of Caro

Install Ultra Violet Disinfection System

Village of Caro

Village of Caro

Water Distribution System Upgrade

Village of Caro

Village of Caro

Water Distribution System Upgrade

Village of Caro

Village of Caro

Water Distribution System Upgrade

Village of Caro Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Carson City-Crystal Area Schools Village of Cass City Village of Cass City Village of Cass City

Village of Caro Carson City Carson City Carson City Crystal Township Crystal Township

Arts Center Rehabilitation Carson City-Crystal Area Schools, High School and Middle School Carson City-Crystal Area Schools, High School and Middle School Carson City-Crystal Area Schools, High School and Middle School Carson City-Crystal Area Schools, Crystal Elementary Carson City-Crystal Area Schools, Crystal Elementary Carson City-Crystal Area Schools, Crystal Elementary Carson City-Crystal Area Schools, Carson Elementary

it

m b u

Crystal Township Carson City

S

Funding Request $

2,218,075 None

Fall 2011

$

9,314,900 None

$

250,000 None

8/9/2009

$

Reduce parking pressure on M-81 425,000 in downtown.

8/9/2009

$

300,000 None

Fall 2011

$

10,636,775 None

Fall 2011

$

2,218,075 None

Fall 2011

$

9,314,900 None

Rehabilitate downtown church that is presently in jeopardy of deteriorating because of structural and drainage problems. Building presently used for performing arts center and art classrooms. Building lifespan will be limited without major renovation including drainage work, electrical upgrade and structural reinformcement. Fall 2009

Fall 2010

$

250,000 None

Window replacement for energy purposes. 39 full energy efficient windows.

June, 2009

August, 2009

$

80,000

Replace existing deteriorating sidewalk which is a hazard.

May, 2009

August, 2009

$

100,000

Pave bus loading zone for our central hub.

May, 2009

August, 2009

$

80,000

Run fiber from elementary to connection completing a broad band circuit

May, 2009

July, 2009

$

40,000

Replace existing single pane windows and glass outside walls.

July, 2009

Nov., 2009

$

80,000

Replace existing 25 year old roof.

July, 2009

Nov., 2009

$

225,000

Replace existing 30 year old roof.

July, 2009

Nov. 2009

$

250,000

T O

s t s

-N

e u

eq

O R

P P A

Install a ultra violet disinfection system for the waste water treatment (wwtp) plant to replace chlorine and sulfur dioxide treatment of waste water. Improvements were originally in a waste water treatment plant bonded renovation project, however was deleted because of cost constraints. Improvements would increase employee safety and reduce environmental impacts because of reduction of chemical usages. ASAP Replace select six inch diameter pipes in road right of way with twelve inch pipe to improve water distribution and fire fighting capability. Fall of 2009 Replace two inches or less diameter pipes in road right of way with eight inch pipe to improve water distribution and fire fighting capability. Fall 2009 Replace four inch in diameter pipes in road right of way with eight and twelve inch pipe to improve water distribution and fire fighting capability Fall 2009

Fall 2010

D VE

Carson City-Crystal Area Schools, Carson Elementary

Move school office to entrance from the middle of the building for logistics and safety and renovate old office into classrooms and conference area. Upgrade electrical. September, 2009 February, 2010

$

350,000

Carson City Carson City & Crystal Township Cass City

Carson City-Crystal Area Schools

Replace 15 year old school bus with an energy efficient propane bus.

May, 2009

August, 2009

$

95,000

Carson City-Crystal Area Schools Street reconstruction

May, 2009 4/9/2009

Nov. 2009 10/9/2009

$ $

175,000 265,000

Cass City Cass City

Division Street extension Schell St. Extension

Resurface, seal, repair and re-stripe all existing parking lots. Reconstruction of Village Major streets Extension of Division St. Into industrial park to allow acces for new business. (DFA, L and L Corp.) Extension of Schell St. Into industrial park to allow acces for new business.

4/9/2009 4/1/2009

9/9/2009 9/9/2009

$ $

231,440 222,742

Carson City

02262009

Route (Infrastructure Only)

Fall 2011

R d

e t t

Expected Completion Date

Submitted Requests - Not Approved

1212 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Village of Cass City

Cass City

WWTP Plant Construction

Village of Cass City

Cass City

WWTP SCADA

Project Description

Start Date

Expected Completion Date

Renovation and new technology for currently obsolete Waste Water Treatment Plant 7/9/2009 Install new SCADA controls to replace obsolete analog and mechanical system controls 2/9/2009

Funding Request

1/7/2010

$

3,200,000

5/9/2009

$

125,000

$

152,000

$

600,000

$

173,600

8/9/2009 10/9/2009

$ $

78,000 265,000

4/9/2009 4/1/2009

9/9/2009 9/9/2009

$ $

231,440 222,742

Renovation and new technology for currently obsolete Waste Water Treatment Plant 7/9/2009 Install new SCADA controls to replace obsolete analog and mechanical system controls 2/9/2009

1/7/2010

$

3,200,000

5/9/2009

$

125,000

11/9/2009

$

152,000

4/11/2009

$

600,000

Village of Cass City

Cass City

Water lopp construction

Village of Cass City

Cass City

Replace fire hydrants

Install a 1320 foot water loop connecting dead end supply lines at a medium density neighborhood and the industrial park, improving fire safety and insuring adequate supplies for both areas. 4/9/2009 212 fire hydrants have been identified as obsolete and/ or deficient and need replacing and raising. 4/9/2009

Village of Cass City

Cass City

Weatherize Village buildings

Improve the insulation, replace windows, and seal Village buildings. For efficiency.

Village of Cass City Village of Cass City

Cass City Cass City

Build addition to Police Department Street reconstruction

Village of Cass City Village of Cass City

Cass City Cass City

Division Street extension Schell St. Extension

Build addtion to improve security and accessibility of police vehicles and equipment. Reconstruction of Village Major streets Extension of Division St. Into industrial park to allow acces for new business. (DFA, L and L Corp.) Extension of Schell St. Into industrial park to allow acces for new business.

Village of Cass City

Cass City

WWTP Plant Construction

Village of Cass City

Cass City

WWTP SCADA

T O

11/9/2009

O R

3/9/2009

P P A

N s

5/9/2009 4/9/2009

4/11/2009

3/10/2009

D VE

Village of Cass City

Cass City

Water lopp construction

Village of Cass City

Cass City

Replace fire hydrants

Install a 1320 foot water loop connecting dead end supply lines at a medium density neighborhood and the industrial park, improving fire safety and insuring adequate supplies for both areas. 4/9/2009 212 fire hydrants have been identified as obsolete and/ or deficient and need replacing and raising. 4/9/2009

Village of Cass City

Cass City

Weatherize Village buildings

Improve the insulation, replace windows, and seal Village buildings. For efficiency.

3/9/2009

3/10/2009

$

173,600

Village of Cass City Village of Cass City Village of Cass City

Cass City Cass City Cass City

Build addition to Police Department Storm Sewer rehab Storm Sewer rehab

Build addtion to improve security and accessibility of police vehicles and equipment. Reconstruct 1,000 feet of failed storm sewer. Reconstruct 1,000 feet of failed storm sewer.

5/9/2009 5/9/2009 5/9/2009

8/9/2009 8/9/2009 8/9/2009

$ $ $

78,000 150,000 150,000

City of Cheboygan

Wastewater Treatment Plant

Treatment System Upgrades and Repair Upgrade to capacity and quality of effluent release

7/1/1905

7/2/1905

$

2,400,000

Cheboygan County

Village of Mackinaw City

Wastewater Treatment Plant

7/1/1905

7/2/1905

$

4,000,000

Cheboygan County

Tuscarora Township

7/1/1905

7/2/1905

$

12,000,000

Cheboygan County

City of Cheboygan

7/1/1905

7/2/1905

$

4,800,000

Cheboygan County

City of Cheboygan

7/1/1905

7/2/1905

$

3,500,000

Cheboygan County

County of Cheboygan

7/1/1905

7/2/1905

$

1,000,000

Cheboygan County

County of Cheboygan

7/1/1905

7/2/1905

$

500,000

7/1/1905

7/2/1905

$

5,000,000

7/1/1905

7/2/1905

$

1,000,000

Cheboygan County

m b u

S

Cheboygan County

County of Cheboygan

Cheboygan County

City of Cheboygan

02262009

itt

Sanitary Sewer Potable Water System

d e t

e u

st

q e R

Treatment System Upgrades and Repair Upgrade to capacity and quality of effluent release Installation of Sanitary Sewer Significant environmental quality improvements Water Main Upgrades, Additional Water Tower, Meter Replacements Complete Marina Replacement - Engineering Work Completed New Marina would be Energy Efficient

County Marina High Speed Internet County Animal Shelter

Provide high speed internet service County wide Addition to current Animal Shelter - Significant Energy Efficient Improvements

County Building County Fairgrounds

Court House and Jail Replacement - Pending Architectural Plan Significant Energy Efficient Improvements and Significant Emergency Preparedness and Safety Improvements Facility Upgrades and Replacement Significant Energy Efficient Improvements

Submitted Requests - Not Approved

Route (Infrastructure Only)

1213 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Funding to support the 12 Mile and Woodward Avenue Pedestrian Crosswalk and safety improvement project. This project includes local, federal and state matching funds and is a partnership between two muncipalities Berkley and Royal Oak.

City of Berkley

Berkley

Woodward Avenue Berkley Pedestrian Improvements

City of Clarkston

City of the Village of Clarkston

Apply the most energy efficient technology available to our 40 year old city hall. Eliminate Police and DPW's 80 year old cinder block bldg and combine with City Hall Make old city hall energy efficient as possible with an energy efficient addition to eliminate duplication of very high energy costs 8/9/2009

City of Clarkston City of Clarkston City of Clarkston

City of Clarkston

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of the Village of Clarkston City of the Village of Clarkston City of the Village of Clarkston City of the Village of Clarkston

City of New Buffalo

City of New Buffalo

City of New Buffalo

City of New Buffalo

6/1/2009

12/10/2009

4/10/2009

Funding Request

$

D VE

525,000 M1

$

1,355,000

$

575,000

4/10/2009

$

425,000

O R

Route (Infrastructure Only)

Storm water mitigation Pedestrian and Handicap accessability and safety Replace deteriorating piping, ourfalls and storm water controls

Implement U-M's Depot Park plan including improving storm water mitigation, park lighting, stream banks stabalization, performance area and related infrastructure improvements Improve handicap accessability, sidewalk improvements, street lighting and other pedestrian safety circulation improvements. Implement low impact development/best management practices for storm water controls, outfalls and deteriorating piping.

6/9/2009

$

425,000

Replace City Police and DPW vehiclese

Replace the City's only two dump trucks (both 13 years old), replace the City's only three police vehicles and all necessary equipment, in car computers, vehicle cameras and finger print machine 4/9/2009

9/9/2009

$

335,000

1. Berrien Street Reconstruction

This project consists of rebuilding two City blocks of north Berrien Street between U.S. 12 and Indiana Street and includes much needed storm sewer, sanitary sewer and water main work. It has been at least 60 years since any major work has been performed on this street. Plans and specifications have been prepared, the project is shovel ready. 6/1/2009

11/30/2009

$

280,000 Berrien Street

2. Mechanic Street Reconstruction

Reconstruction of E. Mechanic Street from Whittaker St. east to Townsend Street, to include 700 linear feet of 12” sanitary sewer line and appurtenances, 504 linear feet of 12” sanitary sewer line and appurtenances, 330 linear feet of 36’ storm sewer, curb, gutter and sidewalks, street paving and surface restoration. Plans and specifications have been prepared, the project is shovel ready. 6/1/2009

11/30/2009

$

385,000 Mechanic Street

3. Paving Projects

Repaving of the Boat Launch parking lot, Marina parking lot, the City portion of Marquette Drive, Madison Street from South Whittaker to Rose City Road, City portion of Stromer Road and miscellaneous paving. Plans and specifications have been prepared, the project is shovel ready. 6/1/2009

11/30/2009

$

Madison/ Stromer, 525,000 etc.

This project consists of installing 116' of 54” storm sewer under the Amtrak Railroad tracks north of U.S. 12, extending northward to the Galien River Marsh to replace an existing 36’ storm sewer. This will provide adequate outfall drainage for the eastern portion of the City. 6/1/2009

11/30/2009

$

750,000

The Water Treatment Plant expansion project will refurbish, modernize and expand an aging facility that has been in service for approximately 40 years. The facility is stressed to provide sufficient water during peak demand periods. In addition to supplying quality water to a continuing increase in seasonal and permanent population the project will benefit surrounding communities in emergency situations. The project will include “green technologies” and energy efficient designs. 9/1/2009

6/1/2010

$

2,500,000

i m

T O

s t s

5. Water Treatment Plant Expansion

5/9/2009

P P A 6/9/2009

10/1/2009

-N

e u

eq

R d

e t tt

4. Griffith Street Storm Drain

ub

City of New Buffalo

Expected Completion Date

12/9/2009

S 02262009

Submitted Requests - Not Approved

1214 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of New Buffalo

City of New Buffalo

Project Name

Project Description

Start Date

6. Whittaker Street Bridge Scour Improvements

Whittaker Street is the main access from the downtown area to the beach and Lake Michigan. The Whittaker Street bridge over the Galien River lies between the City and the Lake and carries over 10,000 vehicles per day. The Galien River narrows and turns as it passes under the bridge. The narrowing and alignment of the channel increase the velocity of the channel around the bridge foundations. The FHWA and MDOT required the City to complete a level II scour analysis as part of their last biennial inspection to determine if the bridge is "scour critical". The analysis indicated that the bridge is scour critcal and that scour countermeasures are required to prevent the failure of the structure. The FHWA and MDOT have required that this work be completed in 2009 or 2010. The countermeasures include armoring the channel with rip rap to prevent future scouring and failure of the structure. The loss of this structure would have a major negative impact on the jobs, economy and access in the community. 4/1/2009

7. Repair to Seawall at City Marina

The City of New Buffalo is a boating community with an economy that relies entirely on it's access to Lake Michigan via the mouth of the Galien River. The City has a municipal marina that rents transient boat slips to encourage boaters to come to New Buffalo. Most of the users are from the Indiana and Chicagoland area and regularly come to New Buffalo to shop, eat and spend money in Harbor Country. The floodwaters from two major storms in 2008 scoured and undermined the seawalls at the City's Marina in the Galien River Channel. The large scour holes under and landward of the seawall prevent the facilities from being used due to safety. The project includes modifying the seawalls, filling the scour holes and installing rip rap to prevent future scouring in this area. Without the repairs, the City and surrounding area and businesses will see a significant decline in tourism and related jobs. 9/1/2009

City of New Buffalo

P P A

O R

Funding Request

Route (Infrastructure Only)

D VE

6/1/2009

$

12/31/2009

$

This project consists of additional improvements to Oselka Park including new play areas, a “square court”, sledding hill, parking lot, fitness stations, irrigation system, parks maintenance building, shelter, band shell, and “green” storm water management control measures with a water garden. The Oselka Park-Phase II is the final phase of park improvements for this park with a goal of establishing a premier multipurpose and cross generational recreation destination on the south side of the City. Oselka Park is extensively used by many individuals and groups including residents and many non residents as well. 7/1/2009

12/31/2009

$

1,600,000

This project consists of a complete makeover and renovation of the City's marquee water front area including river shoreline improvements ($1,445,000), Galien River shoreline connector bridge and walkway ($1,292,000), Whittaker Street & Lions Park improvements ($747,000), beach access and building improvements ($2,046,000), riverfront improvements ($1,874,000), dune access improvements ($346,000), breakwater arm access improvements ($480,000), and launch area improvements ($271,000). The City's waterfront area is one of the most heavily used waterfronts in the State of Michigan and serves a Chicago metropolitan area of more than 6 million people. 9/1/2009

6/1/2010

$

8,600,000 Galien River

T O

City of New Buffalo

Expected Completion Date

N s

t s e

60,000 Whittaker Street

700,000 Galien River

u q e

City of New Buffalo

City of New Buffalo

R d

e t tt

8. Oselka Park-Phase II

i m

City of New Buffalo

b u S

City of New Buffalo

02262009

9. Waterfront Transformation Project

Submitted Requests - Not Approved

1215 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

City of New Buffalo

City of New Buffalo

Project Name

Project Description

Start Date

10. Central Business District Infrastructure Replacement/ Upgrades

This project entails the replacement and upgrading of infrastructure in the City of New Buffalo Central Business District. The infrastructure is at least 60 years old and significantly beyond its useful life span. Infrastructure work will take place mainly on the portions of Whittaker Street and Mechanic Street located in the Central Business District and include new street, with curb and gutter, storm and sanitary sewers, burying of overhead wiring, ornamental street lighting and new streetscape design elements. 9/1/2009

City of New Buffalo

11. Dredging Federal Channel below Whittaker Street Bridge

The City of New Buffalo is a boating community with an economy that relies entirely on it's marina's access to Lake Michigan via the mouth of the Galien River. The floodwaters from two major storms in 2008 discharged an immense amount of sediment to the mouth of the river which has restricted the access to Lake Michigan. This problem is compounded by the low water levels in lake Michigan and the USACOE reduced dredging of the channel. The project would dredge the federal portion of the channel to remove the shoals that prevent boats from accessing lake Michigan. The dredged material will be used to supplement a beach nourishment area established by the USACOE. Without the dredging, the City and surrounding area and businesses will see a significant decline in tourism and related jobs. 6/1/2009

City of New Buffalo

The City of New Buffalo is a boating community with an economy that relies entirely on it's marina's access to Lake Michigan via the mouth of the Galien River. The floodwaters from two major storms in 2008 discharged an immense amount of sediment to the mouth of the river which has restricted the access to Lake Michigan. This problem is compounded by the low water levels in lake Michigan and the USACOE reduced dredging of the channel. The project would dredge the state portion of the channel upstream of the Whittaker Street Bridge to remove the shoals that prevent boats from accessing lake Michigan. The dredged material will be used to supplement a beach nourishment area established by the USACOE. Without the 12. Dredging Channel Upstream of Whittaker dredging, the City and surrounding area and businesses will see a significant decline Street Bridge in tourism and related jobs. 6/1/2009

City of New Buffalo

Expected Completion Date

T O

6/1/2010

O R

Funding Request

Route (Infrastructure Only)

D VE $

2,500,000 Whittaker Street

P P A

7/1/2009

$

500,000 Galien River

N s

t s e

City of New Buffalo

City of New Buffalo

City of New Buffalo

u q e

7/1/2009

$

500,000 Galien River

Reconstruction of E. Jefferson St. from Whittaker St to the City limits. The ambulance facility is located here and the street serves as emergency access to the Four Winds Casino. Project includes full depth milling, under drain, and 18" culvers, to improve stormwater management. 7/1/2009

12/31/2009

$

500,000 Jefferson Street

6/1/2010 180 days 180 days

$ $ $

650,000 Water Street 55,000 55,000

R d

13. Jefferson Street Reconstruction

e t tt

City of New Buffalo City of Vassar EDC City of Vassar EDC

City of New Buffalo City of Vassar City of Vassar

14. Water Street Box Culvert Develop EDC property Develop EDC property

This project would install a box culvert system for Water Street at Lighthouse Creek, providing appropriate channelization of upstream waters. Current culvert is completely insufficient, as shown by September 2008 storm event which damaged upstream properties and endangered Water Street, which is the sole access to hundreds of residents and the City's water plant. 9/1/2009 Purchase and develop property 909 Huron ave after purchase Purchase and develop property 909 Huron ave after purchase

City of West Branch City of West Branch

City of West Branch, West Branch Township and Ogemaw Township City of West Branch

City of West Branch City of West Branch

West Branch Area WWTP & Collection Systems Improvement City of West Branch Water Well Construction

5/9/2009 5/9/2009

5/11/2009 12/9/2009

$ $

16,820,000 1,500,000

City of West Branch

City of West Branch, West Branch Township and Ogemaw Township

City of West Branch

West Branch Corridor (Exit 212-215) Streetscape Project

7/9/2009

7/11/2009

$

4,000,000

i m

b u S

02262009

Submitted Requests - Not Approved

1216 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Conservation Resource Alliance

Crystal Lake Art Center Dundee Township EUP Learning Center Inc.

15 countiey region in northwest rural michigan

Project Name

Project Description

The project involves replacing failing local bridges that are adversely impacting the premier waterways of northern lower Michigan. Conditions at these bridges have been documented to destroy fisheries habitat, impact navigability, and cause safety and maintenance concerns. Rural counties in this area need assistance to replace aging structures that cross rivers like the Pere Marquette and Big Manistee. Through established community partnerships, 35 of the worst bridges will be replaced with modern structures, improving local transportation systems, while protecting National Wild & Scenic rivers and Blue Ribbon trout streams that fuel Michigan’s $12 billion tourism industry. immediate

Northern MI Regional Clean Water & Transportation Initiative

Fire and Substation

Sault Ste Marie MI

Sault Ste Marie

See attached narrative.

t i m

Upgrading technology for efficiency & a greener Fontana ENERGY-EFFICIENT LIGHTING; FACILITIES REPAIR

ub

q e R

N s

st

e u

d e tt

Fontana Chamber Arts Kalamazoo FRIENDS SCHOOL DETROIT DETROIT MI

T O

O R

Funding Request

Route (Infrastructure Only)

D VE

Dec. 31, 2012

$

5,000,000 multiple

4/30/2010

$

Capital Investment or Community Development Block 2,200,000 Grant

3 to 6 months

$

4,000,000

On-going

$

178,000

$

120,000 CONSTRUCTION

P P A

In partnership with the City of Frankfort, the Crystal Lake Art Center is working to adapt the city’s historic Coast Guard Station to public use as a Center for the Arts. The City of Frankfort received the property and building from the federal government through the land to parks program. The $2.2 million capital campaign to transform the station has already attracted confirmed pledges of $1.3 million. The project will renovate and re-use one of the region’s most recognizable buildings as a bridge between Benzie County’s industrial past and the knowledge-based, entrepreneurial, and creative culture and economy that have steadily evolved. The CLAC is working with Quinn Evans | Architects and will pursue green building and LEED certification. The campaign unites Frankfort and CLAC in a long-term collaborative effort to leverage art exhibitions and education and the adaptive reuse of an historic property to strengthen a dynamic downtown. It will attract new businesses in and near the city center and provide for new art, recreational, and service-related jobs. To construct a 20,000 sq. ft. building to house a firestation, police and ambulance substation. immediately

Adaptive Re-use of the former Coast Guard Station Frankfort to a new center for the arts

Frankfort Dundee Township, Dundee MI

Start Date

Expected Completion Date

9/1/2008

FCA will upgrade computer & printer hardware to work more effectively & to create more environmental efficiencies: 1. Acquire an Energy Star network server or one with an EPEAT rating of Bronze or better.EPEAT equipment is "green" beyond just its energy efficiency. It uses fewer harmful substances that remain in landfills; the bodies are recyclable and/or made from previously recyclec materials, and; less packaging is used creating less post consumer waste. A server would provide improved efficiency by allowing shared access to records. 2. Acquire 2 laptop computers with Windows Vista capability. Laptops use 5 times less energy than desktop PCs. Unlike Windows XP used in most of our computers, Vista uses more energy efficient features that automaticall adjust processing power based on use, e.g., powering down features used in displaying video or pictures when only typing. 3. Acquire 2 ink jet The earlier of printers, which use 80-90% less energy than laser printers, with two-sided printing April 1 or when capability. These printers also would allow us to have a dedicated "draft" printer funding is loaded with previously used paper as well as retire an older, energy inefficient laser pr received One month later The 44-year-old fluroescent lighting in the school will be replaced with Energy Star Within 2 weeks of Within 6 weeks of approved effiecient lighting; The roof will be resurfaced. award award

S 02262009

Submitted Requests - Not Approved

1217 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Gogebic-Ontonagon ISD Greenville Public Schools Greenville Public Schools Greenville Public Schools Greenville Public Schools Greenville Public Schools Greenville Public Schools Greenville Public Schools Greenville Public Schools Greenville Public Schools

Project Name

Bergland Township

Building Expansion

Greenville

Solar Roof

Greenville

Solar Roof

Greenville

Solar Roof

Greenville

Solar Roof

Greenville

Solar Roof

Greenville

Solar Roof

Greenville

Project Description

Start Date

Expected Completion Date

Building Expansion--To accommodate staff and community agencies for consolidated services to our local districts and counties. We cover 2500 Sq. miles in the farthest two Western Upper Peninsula Counties. (Gogebic and Ontonagon Counties) This project woul enable us to house programs/office space/servers as well as conference room facilities for other county agencies as well as current local district personnel. We would have the capacity to become a truly centralized administration facility for both counties for a variety of governmental agencies and offices thus enableing our two counties to streamline expenditures and economies of scale a nd form true collaboration on a multitude of needs and services for our residents. This would also facilitate the move toward multi-county wide school districts. 9/1/2009 Apply United Solar technology to roof replacement project for Baldwing Heights Elementary 6/1/2009

O R

Funding Request

D VE

9/1/2010

$

2,000,000

6/30/2010

$

1,467,200

6/30/2010

$

1,414,600

6/30/2010

$

1,383,000

Apply United Solar technology to roof replacement project for Walnut Hills Elementary 6/1/2009 Apply United Solar technology to roof replacement project for Greenville Middle School 6/1/2009

6/30/2010

$

1,356,700

6/30/2010

$

5,134,900

6/30/2010

$

8,689,900

Solar Roof

Apply United Solar technology to roof replacement project for Greenville High School 6/1/2009 Apply United Solar technology to roof replacement project for Central Services Building 6/1/2009

6/30/2010

$

1,814,200

Greenville

Carpeting

New carpeting for all school buildings

6/1/2009

7/31/2009

$

200,000

Greenville

Boiler

New Boiler for Middle School

7/31/2010

9/1/2010

$

300,000

Reconstruction of existing county drain to address flooding of residential and university buildings and properties and to allow for the construction of new university buildings and subdivision development 6-01--2009

6/1/2011

$

8,000,000

Reconstruction of existing county drain to address flooding of residential and university buildings and properties and to allow for the construction of new university buildings and subdivision development 6-01--2009

6/1/2011

$

8,000,000

Lapeer County Medical Care Facility, a 202 Bed Skilled nursing home that provides care to the medically indigent population in the Lapeer County area. More than 85% of the residents are on the Medicaid program. The Facility proposes to construct a new addition and renovate existing portions of its aging Facility into smaller “neighborhoods” that allow residents to live in smaller group environments thus avoiding the institution feel of larger group community living. The Facility would reduce the number of semi-private rooms and construct private rooms. Currently, the Facility has less than 6% private rooms and the new construction would bring that figure up to 70%. Several studies have documented the positive impact that private resident rooms have on the psychosocial and physical sense of well being on the skilled nursing home resident. The construction and renovation project would add eight pod additions with kitchen, dining, living rooms and connecting wings creating 134 private resident rooms. The Facility would modernize its heating, ventilation and air conditioning systems. Also, it would upgrade the medical records in to new compu 10/9/2009

4/11/2009

$

11,000,000

Isabella County Drain Office

Union Township, Citty of Mount Pleasant, Central Michigan University

Isabella County Drain Office

Union Township, Citty of Mount Pleasant, Central Michigan University

A T

Apply United Solar technology to roof replacement project for Cedar Crest Elementary6/1/2009 Apply United Solar technology to roof replacement project for Lincoln Heights Elementary 6/1/2009

Upton Drain

Upton Drain

itt

d e t

S 02262009

Suncrest Culture Change

q e R

s

st

e u

m b u

Lapeer County Medical Care Facility Mayfield Township

PP

O N

Submitted Requests - Not Approved

Route (Infrastructure Only)

1218 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Lenawee County

Project Name

Project Description

Start Date

Expected Completion Date

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: AHU and Relief Fan Replacement, Conversion to VAV, Chiller Replacement, CHW Pump VFD, Boiler Replacement, HWH Pump VFD, New Valves Perimeter Radiation, New VAV Boxes, Lighting Retrofit, Controls, Water Retrofit, Building Envelope, New Piping and Reheat Coils for Interior Zones, Water Adrian, Michigan Lenawee and Air Balance, Ceiling Replacement and Repair, Diffusers and Grilles, Front County Human Services Building - Energy Efficiency Entrance System 4/1/2009

4/1/2010

Funding Request

D VE $

3,565,000

3/15/2010

$

880,845

O R

Lenawee County

Adrian, Michigan Lenawee Old Courthouse County Energy Efficiency

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Enerby by 2025: AHU/RF replacement, Domestic Water Heater Retrofit, AHU/RF VAV Conversion, Radiant Heating Zone Control, Expanded Zone Control, Lighting, Controls, Water retrofit, Building Envelope 6/15/2009

Lenawee County

Adrian, Michigan Lenawee County Jail County Energy Efficiency

Increased Energy Efficiency through Renewable Energy Souces to meet goal of 25% Renewable Energy by 2025: Solar Domestic Water Heater, Lighting, Controls, Water Retrofit, Building Envelope, Dryer OA Damper Control 5/15/2009

10/15/2009

$

385,409

Adrian, Michigan Lenawee Physical Resources County Energy Efficiency

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: Rooftop (RTU) HVAC Units Replacement, Lighting, Controls, Water Retrofit, Building Envelope 5/15/2009

10/15/2009

$

240,645

Adrian, Michigan Lenawee County Library County Energy Efficiency

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: Chiller Replacement, Lighting, Controls, Water Retrofit, Building Envelope 5/15/2009

7/15/2009

$

274,598

Adrian, Michigan Lenawee Pifer Garage County Energy Efficiency

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Enerby by 2025: Radiant Tube Heaters, Lighting, Water Retrofit, Building Envelope 5/15/2009

6/15/2009

$

30,058

Adrian, Michigan Lenawee Robertson Building County Energy Efficiency Adrian, Michigan Lenawee Drain Barn County Energy Efficiency

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: Lighting, Water Retrofit, Building Envelope 5/15/2009 Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: Lighting, Building Envelope 5/15/2009

6/15/2009

$

11,917

6/15/2009

$

11,456

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: Rooftop HVAC Units Replacement, RTU Replacement, Boiler Replacements, Furnace Replacement, Domestic Water Heater Replacement, Radiant Tube Heater, Domestic Water Heater Replacement, Refrigeration Unit Replacement, Lighting, Controls, Water Retrofits, Building Envelopes, Wind Turbine 5/15/2009

5/15/2010

$

900,330

Increased Energy Efficiency through Renewable Energy Souces to help meet goal of 25% Renewable Energy by 2025: Add Biomass Boiler, Wood Chip Storage Building, Underground Piping to Judicial Building and Connection to Old Courthouse 8/15/2009

8/15/2010

$

1,802,960

Roof Replacement

5/15/2009

5/31/2009

$

98,000

Old Courthouse Preservation Project

5/15/2009

2/15/2010

$

188,500

11/15/2009

$

1,707,800

Lenawee County

Lenawee County

Lenawee County

Lenawee County Lenawee County

Lenawee County

Lenawee County Lenawee County Lenawee County

Lenawee County

T O

d e t

Adrian, Michigan Lenawee Judicial/Old Courthouse County Energy Efficiency Adrian, Michigan Lenawee County Library County Roof Replacement Adrian, Michigan Lenawee Courthouse County Preservation Project

u S

bm

Adrian, Michigan Lenawee Human Services Building County Updates/Improvements

02262009

-N

e u

Adrian, Michigan Lenawee Maurice Spear Campus County Energy Efficiency

itt

s t s

P P A

q e R

Masonry updates to compensate for bricks which have absorbed water and begun to grow, Add catch basin to lower level parking lot, design build lower parking lot for drainage, and mill/resurface for the upper and lower parking lots, add trash container enclosure, for trash and recyclables, replace roof, which has reached the end of it's useful life. 5/15/2009

Submitted Requests - Not Approved

Route (Infrastructure Only)

1219 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

McKenzie Memorial Hospital

Sandusky

Project Name

Project Description

Start Date

McKenzie Memorial Hospital (MMH) is a Critical Access Hospital (CAH) located in Sandusky, Michigan; the Sanilac County seat. MMH is a 50 year old facility that was built in the Hill-Burton era and has not significantly changed during its life. It is unlikely MMH will be able to meet these rapidly evolving expectations without the benefit of an appropriately designed building. MMH’s board of directors has recognized the need and approved the idea of replacing the facility. There are 3 scenarios to be considered; one scenario is the first phase of a phased approach to a facility replacement. The first phase would replace our existing Emergency and Surgical departments, probable cost is $15,000,000.00, and could be started in 90 days (with approval processes streamlined at the state and local level). The second scenario would replace the facility on the existing site (as was planned) without the phasing at a probable cost of $41,702,000.00, and could be started within 90 days (with approval processes streamlined at the state and local level). The third scenario would replace the facility on a new site at a probable cost of $39,237,000.00 and could be started in 6/1/2009

Replacement facility

Expected Completion Date

T O

P P A

O R

McKenzie Memorial Hospital (MMH) is a Critical Access Hospital (CAH) located in Sandusky, Michigan; the Sanilac County seat. MMH is a 50 year old facility that was built in the Hill-Burton era and has not significantly changed during its life. It is unlikely MMH will be able to meet these rapidly evolving expectations without the benefit of an appropriately designed building. MMH’s board of directors has recognized the need and approved the idea of replacing the facility. There are 3 scenarios to be considered; one scenario is the first phase of a phased approach to a facility replacement. The first phase would replace our existing Emergency and Surgical departments, probable cost is $15,000,000.00, and could be started in 90 days (with approval processes streamlined at the state and local level). The second scenario would replace the facility on the existing site (as was planned) without the phasing at a probable cost of $41,702,000.00, and could be started within 90 days (with approval processes streamlined at the state and local level). The third scenario would replace the facility on a new site at a probable cost of $39,237,000.00 and could be started in 6/1/2009

Funding Request

Route (Infrastructure Only)

D VE

6/1/2011

$

41,702,000

6/1/2011

$

41,702,000

11/15/2009

$

N s

t s e

qu

McKenzie Memorial Hospital

Sandusky

Medina Township

Medina Twp

Plastic Recovery Services, Inc.

PLASTIC RECOVERY SERVICES INC. Warren, Mi The company has launched an effort to provide job opportunities for individuals displaced by the current recession. Formed by a group of retired executives and an energetic young work force. Company intends on creating jobs in the heart of industrial depressed area. Focus is on Recycled Plastic Material for use in road base recycling Plastic for the benefit of the State for use in Highway projects where regrind Warren, Macomb County and concrete/ aggregate. plastic may be used as a road base material or aggregate/concrete mix. 4/9/2009

Village of Millington

Replacement facility Packard Road from US 127 to 1.84 miles east rebuild Structural Improvements

d e tt

t i m

Millington

02262009

b u S

Fulmer Watermain

e R

6/1/2009

Replace old watermain (two breaks this winter already). The existing Fulmer Road watermain is one of the oldest remaining pipes to be replaced. Most of the pipe is asbestos-cement or old cast -iron. Each year pipe breaks within this stretch of watermain cost thousands of dollars to repair. The pipe would be replaced with new SDR 18 PVC watermain and all existing service lines would be retapped and replaced to the road right-of-way line. 9/1/2009

Submitted Requests - Not Approved

365,000 Local

4/11/2009

8/1/2010

TBD

$

100,000

1220 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Millington

Village of Millington

Village of Millington

Village of Millington

Village of Millington

Village of Millington

Village of Millington

Millington

Millington

Millington

Millington

Millington

Millington

Millington

02262009

Project Name

Project Description

Start Date

WWSL CELL 2

Reconstruction of clay liner; add wind-operated aerators. MDEQ has alerted the Village of an inadequate clay liner at Wastewater Stabilization Lagoon (WWSL) Cell No. 2.Sludge build-up at the cell bottom has reduced storage capacity. Each spring the wastewater treatment system reaches capacity, limiting growth within the Village limits (readiness to take on new users). This project will increase treatment capacity (add ability for Village growth), improve treatment efficiency (less potential for carryover of biosolids) and protect groundwater quality by creating a new liner at the cell bottom. 9/1/2009

Beckwith Sanitary Sewer

Reconstruct and extend sanitary sewer main. This stretch of sewer is believed to previously be an old storm or combined sewer, which is undersized and probably of clay material. Over the years, development has been pushed Westerly toward the cemetery but the main has stayed where it is, with undersized services extended Westerly. This project would replace the old pipe with SDR 35 PVC pipe and extend the main across service areas along Bechwith.

Fulmer Watermain

Replace old watermain (two breaks this winter already). The existing Fulmer Road watermain is one of the oldest remaining pipes to be replaced. Most of the pipe is asbestos-cement or old cast -iron. Each year pipe breaks within this stretch of watermain cost thousands of dollars to repair. The pipe would be replaced with new SDR 18 PVC watermain and all existing service lines would be retapped and replaced to the road right-of-way line. 09.01.09

WWSL CELL 2

Reconstruction of clay liner; add wind-operated aerators. MDEQ has alerted the Village of an inadequate clay liner at Wastewater Stabilization Lagoon (WWSL) Cell No. 2.Sludge build-up at the cell bottom has reduced storage capacity. Each spring the wastewater treatment system reaches capacity, limiting growth within the Village limits (readiness to take on new users). This project will increase treatment capacity (add ability for Village growth), improve treatment efficiency (less potential for carryover of biosolids) and protect groundwater quality by creating a new liner at the cell bottom 09.01.09

T O

s t s

-N

R d

O R

P P A 9/1/2009

e u

eq

Expected Completion Date

10/1/2010

Funding Request

D VE $

1,245,000

12/30/2009

$

35,000

08.01.10

$

100,000

10.01.10

$

1,245,000

Replace deteriorated watermain. This stretch of watermain is of the old asbestoscement or cast-iron type, which has experienced several watermain breaks. New construction will be SDR 18 PVC pipe which is readily tapped for new water service hookups.

09.01.09

12.30.09

$

35,000

Beckwith Sanitary Sewer

Reconstruct and extend sanitary sewer main. This stretch of sewer is believed to previously be an old storm or combined sewer, which is undersized and probably of clay material. Over the years, development has been pushed Westerly toward the cemetery but the main has stayed where it is, with undersized services extended Westerly. This project would replace the old pipe with SDR 35 PVC pipe and extend the main across service areas along Bechwith.

09.01.09

12.30.09

$

35,000

Fulmer Watermain

Replace old watermain (two breaks this winter already). The existing Fulmer Road watermain is one of the oldest remaining pipes to be replaced. Most of the pipe is asbestos-cement or old cast -iron. Each year pipe breaks within this stretch of watermain cost thousands of dollars to repair. The pipe would be replaced with new SDR 18 PVC watermain and all existing service lines would be retapped and replaced to the road right-of-way line. 09.01.09

08.01.10

$

100,000

Blocker Watermain

e t tt

i m

b u S

Submitted Requests - Not Approved

Route (Infrastructure Only)

1221 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Village of Millington

Village of Millington

Village of Millington

Village of Millington

Millington

Millington

Millington

Millington

Project Name

Project Description

Start Date

Fulmer Watermain

Replace old watermain (two breaks this winter already). The existing Fulmer Road watermain is one of the oldest remaining pipes to be replaced. Most of the pipe is asbestos-cement or old cast -iron. Each year pipe breaks within this stretch of watermain cost thousands of dollars to repair. The pipe would be replaced with new SDR 18 PVC watermain and all existing service lines would be retapped and replaced to the road right-of-way line. 9/1/2009

WWSL CELL 2

Reconstruction of clay liner; add wind-operated aerators. MDEQ has alerted the Village of an inadequate clay liner at Wastewater Stabilization Lagoon (WWSL) Cell No. 2.Sludge build-up at the cell bottom has reduced storage capacity. Each spring the wastewater treatment system reaches capacity, limiting growth within the Village limits (readiness to take on new users). This project will increase treatment capacity (add ability for Village growth), improve treatment efficiency (less potential for carryover of biosolids) and protect groundwater quality by creating a new liner at the cell bottom. 9/1/2009

Beckwith Sanitary Sewer

Reconstruct and extend sanitary sewer main. This stretch of sewer is believed to previously be an old storm or combined sewer, which is undersized and probably of clay material. Over the years, development has been pushed Westerly toward the cemetery but the main has stayed where it is, with undersized services extended Westerly. This project would replace the old pipe with SDR 35 PVC pipe and extend the main across service areas along Bechwith.

Fulmer Watermain

Replace old watermain (two breaks this winter already). The existing Fulmer Road watermain is one of the oldest remaining pipes to be replaced. Most of the pipe is asbestos-cement or old cast -iron. Each year pipe breaks within this stretch of watermain cost thousands of dollars to repair. The pipe would be replaced with new SDR 18 PVC watermain and all existing service lines would be retapped and replaced to the road right-of-way line. 09.01.09

T O

s t s

-N

e u

d e tt

q e R

Expected Completion Date

8/1/2010

9/1/2009

D VE $

100,000

10/1/2010

$

1,245,000

12/30/2009

$

35,000

08.01.10

$

100,000

O R

P P A

Funding Request

Route (Infrastructure Only)

t i m

b u S 02262009

Submitted Requests - Not Approved

1222 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Funding Request

Route (Infrastructure Only)

Monroe County are in the following townships:

Monroe County Drain Commissioner

- Wager & Pink Intercounty Drain - Berlin Township - Lotus Tile Drain - Erie Township - South Branch Otter Creek Drain - Ida & Bedford Townships - Reau Drain - Bedford Township - Howard Street North Park Tile Drain - Ottawa Lake Outlet Drain - Whiteford Township - Parker Drain Summerfield Township - Lawrence Drain - Ida & Summerfield Townships - Middle Branch Willow Run Drain - Raisinville Township - Thayer Drain - Milan & London Townships - West Branch Thayer Drain - London Township - Dombrosky Drain Bedford Township - West Branch Cone Creek - Bedford Township - Bates Drain - Ida Township - Dunn & Murphy Drain Exeter Township - Rambo Drain - Bedford Township Monroe County Drain Debrushing

Monroe County Drain Commissioner

Erie, Erie Township

Monroe County Drain Commissioner

Bedford Township

O R

- Wager & Pink Intercounty Drain - Lotus Tile Drain - South Branch Otter Creek Drain - Reau Drain - Howard Street North Park Tile Drain - Ottawa Lake Outlet Drain - Parker Drain - Lawrence Drain - Middle Branch Willow Run Drain - Thayer Drain - West Branch Thayer Drain - Dombrosky Drain - West Branch Cone Creek - Bates Drain - Dunn & Murphy Drain - Rambo Drain

N s

t s e

u q e

e t tt

R d

Pollution Control Equipment Upgrade

i m

Flood Relief & Drainage Improvement

ub

P P A

The project will clean up, improve stormwater conveyance, and add beautification to the following by removing excess vegetation, growth and debris alongside and within these listed drains:

Bedford Wastewater Treatment Plant Upgrades

Lambertville Tile Drain Project

T O

D VE

ASAP

Summer/Fall of 2010 -or- within 1.5 years from start. $

ASAP

2011 or within 2 years of start date. $

ASAP

2010 or within 1 year of start date.

Along Monroe County Designated Storm Water Drainage Systems See Project 4,873,000 Description

10,000,000 Onsite

$

Along the Lambertville Tile 1,000,000 Drain

Monroe County Drain Commissioner

Bedford Township

Swiss Garden Project

Flood Relief & Drainage Improvement

ASAP

2010 or within 1 year of start date.

$

Within the Swiss Gardens Subdivision & alongside the Swiss Garden Tile 1,100,000 Drain

Monroe County Drain Commissioner

City of Luna Pier & Erie Township

Lakeside Drain Project

Flood Relief & Drainage Improvement

ASAP

2010 or within 1 year of start date.

$

Along the Lakeside 1,300,000 Drain

S

02262009

Submitted Requests - Not Approved

1223 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Monroe County Drain Commissioner

City of Monroe / Monroe Township

Monroe County Drain Frenchtown Charter Commissioner Township Mount Clemens Public Library Mount Clemens Mount Clemens Public Library Mount Clemens

Operation Unification Non-Profit Organization

Portage Township, Village of Curtis

Project Name

Project Description

River Raisin Contamination Dredging

Start Date

$

2010 or within 1 year of start date.

$

Along the Lambertville Tile 39,000,000 Drain

8/10/2009

$

950,000

8/10/2009

$

2,550,000

Install a new Sanitary Sewer Collection system and Wastewater Treatment System to replace existing on-site septic systems, many which are undersized, failing, or don't meet current regulatory codes for design, lot size (isolation), or groundwater separation. This project will also serve to protect the pristine Mansitique Lakes (a popular summer vacation destination) from untreated sewage discharges from the Village of Curtis. June 2010

November 2010

$

4,500,000

RRRASOC would like to retrofit its Material Recovery Facility (MRF) to what is know as a single-stream processing facility. Currently the facility is "dual-stream", meaning that paper materials are processed separately from the glass, metal and plastic materials. As such, those items must be collected in compartmentalized vehicles so as to be able to drop the different materials on separate tipping floors for processing. Retrofitting the facility to single-stream capability will enhance curbside collection efficiencies by allowing all materials to be commingled at the point of collection. It will also improve the facility's market position due to the fact that there are only two other single-stream facilities in Michigan. Further, it improves the Michigan's overall recycling capabilities. In addition, the retrofit will represent investment in new capital equipment and the jobs that are associated with such investment. 7/1/2009

10/1/2009

$

4,000,000

Exterior Renovation

Dike Rebuilding Project ASAP This 40-year old building requires a new roof, aggregate panel replacement, window replacement, parking lot resurfacing. 3/9/2009

Completion of Interior Renovation

The library is 40 years old. This would complete a renovation begun in 2004. Included would be new energy-saving lighting as well as mechanical and electrical infrastructure replacement.

The Village Children's Amusement Park

Operation Unification's revitalization plan to stabilize and grow communities is proposing the development of The Village Children's Amusement Park. This project would permit us to employ even more in Genesee County. The Village Childen's Amusement is Phase II an extension of our Party Zone Entertainment and community theatre. The proposed site is a five acre parcel in the Northeast section of the Beecher Community on N. Saginaw Rd; the major thoroughfare and business corridor. A census from 1990 to 1998 found that recreation increased by $31.5 billion with and overall industry gross of 56.2 billion. Quality entertainment would aid in curbing the idleness many of the youth are forced to endure in the community. The prices for entertainment would be low and nominal for the community. Operation Unification is requesting 2,000,000.00 for this expansion. We have already invested 600,000.00 in phase one of this project.

t i m

Resource Recovery and Recycling Authority of Southwest Oakland County Southfield

ub

Material Recovery Facility Single-Stream Conversion

3/9/2009

P P A

O R

D VE

N s

Curtis, Portage Township/ Mackinac County/ Portage Township, Village of Curtis Sanitary Michigan Sewer System

d e tt

2010 or within 1 year of start date.

ASAP

T O

Genesee Township

Funding Request

Route (Infrastructure Only)

Along the River Raisin Area of Concern (AOC) 5,200,000 Monroe, MI

PCB Dredging

Frenchtown Resort Dike Project

Expected Completion Date

t s e

qu

e R

S 02262009

Submitted Requests - Not Approved

1224 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Richmond Township

Riga Township

Saginaw Riverfront Commisions Sebewaing Light& Water Sebewaing Light& Water

Sisler English Language Skills Academy LLC

Richmond Township, Marquette County

Project Name

Project Description

Richmond Township Water & Sewer System Upgrade

Start Date

The proposed water system upgrade will bring the community water system to current standards. It will include the installation of 440 LF of 8”, 12,000 LF of 6”, 200 LF of 4” ductile iron water main water main, 4,300 LF of !” copper water service, rehabilitation of the existing water storage tank, addition of a booster station, including two domestic pumps, two high-capacity pumps, a 35 kw standby generator, replacement of all valves, fire hydrants, and will add water meters for all customers. The existing sewer system is 50 years old and has root intrusions in many areas. The proposed project will replace the existing clay tile sewer mains with 8,000 LF of 8" PVC sanitary sewer main, 4,500 LF of 4” sewer lateral, and replace the old brick manholes with new precast manholes. The project has strong community support as the customers anticipate elimination low water pressure and sewer backups from blocked pipes. 5/1/2009

Riga Township, Michigan Riga Township Fire Station

City of Saginaw

Urban Trail System

Saginaw County has begun the process of transforming abandoned rail lines into a linear park system. When complete, the active bike/walking trail will meander throughout the entire county eventually connecting at the northern end to Bay County, and ultimately the Saginaw Bay. The City of Saginaw already has a park system that stretches the entire length of river, and sadly is only missing the connection points to the rest of the trail system. This project would create those connections, by installing bike paths, sidewalks, and linear parks to join to the existing trail system. The project will employ green technology, by using solar lights to illuminate the trail. 6/9/2009

Sebewaing

water improvements

Sebewaing

water improvements

Hamtramck, MI

It is the intention of local education and business professionals to develop an English language skills academy providing English languge instructin to adults with limited or no languge proficiency in Hamtramck and surrounding metropolitan Detroit, MI. The academy would provide a premier educational program in both language and career skills and develop partnerships with local businesses and community leaders. Additionally, preparation and instruction for passing the U.S. Citizenship Exam will be Sisler English Language Skills Academy LLC provided. Immediately

02262009

T O

-N

e u

eq

e t tt

R d

Funding Request

12/1/2009

$

3,335,000

Twelve months after start date

$

75,000

11/9/2009

$

1,500,000

6/9/2009

10/1/2009

$

1,631,250

12000+ feet of water main and repair aging water towers

6/9/2009

10/1/2009

$

1,631,250

Immediate and ongoing $

100,000

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE

12000+ feet of water main and repair aging water towers

i m

b u S

O R

P P A

We are planning to build a 10,000 square foot fire station on property that adjoins the present township property and community center. The property already has utilities and shared parking. The fire department is presently utilizing off-site storage for some of their properties. The new facility will be an upgrade of existing building inefficiencies. The building will house a training room, decontamination facility with shower, ambulance storage, secure file storage, laundry, and exhaust removal system, and additional equipment storage areas. The new sation will meet the Three months requirements of the American Disability Act. after funding

s t s

Expected Completion Date

1225 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Sparrow Health System

Project Name

Project Description

Based in Lansing, MI, this project would have a direct effect on healthcare for over 1.1 million citizens in Ingham, Jackson, Livingston, Eaton, Clinton, Barry, Ionia, Shiawassee, Gratiot, Montcalm, Isabella and Clare Sparrow's mid-Michigan Regional Electronic counties. Medical Records Project

Start Date

The Sparrow Capital Region Electronic Medical Record project will transform healthcare by providing, comprehensive electronic access to health information that will enhance patient safety, improve care quality and reduce health care costs. This shovel-ready project stands ready for immediate implementation with a 67-member project team already assembled. The project will create more than 100 new, highly skilled IT jobs as well as spur job-creation through the use of local vendors to build a dedicated high-speed data network. The Sparrow EMR will be provided to several rural hospitals and nearly 1,000 physicians throughout the region. Sparrow’s EMR will empower the residents of mid-Michigan to take control of their health by granting them access to their own medical records and providing them enhanced tools to manage their care. ASAP

The GirlFriend Network, Inc.

Lansing, City of

Highland Park, Michigan

Holmes Street Elementary Technology Incubator and Training Center

t i m

d e tt

The GirlFriend Network, Inc.

P P A

O R

Dec 31, 2010 or 18 months after funding approved $

4 months after contract award

The GirlFriend Network (GFN) is an organization for the female gender to educate and nourish the minds of females everywhere. The organization provides females of all ages the needs of personal characteristics. The mission of the GirlFriend Network is to help at-risk girls make a healthy transition from adolescence to womanhood and also aim to help women of all ages increase their confidence, self-awareness, and self esteem. The GirlFriend Network is formulated for professionals help adolscent at-risk youth and women in their weaknesses to become stronger and productive women. The GirlFriend Network would open and outreach center for all females. The target population the GirlFriend Network would be Highland Park, Michigan and Pilgrim Village community. Southwest Asian heroin is easily available in the Detroit metropolitan area of Michigan, with New York as the primary point of origin for the influx of Southwest Asian heroin. While neighborhoods still has a fair amount of boarded-up houses and vacant lots, in the last few years a number of single-family house and apartments have been built by local community development groups. The 6/9/2009

Ongoing

st

e u

q e R

N s

Funding Request

Route (Infrastructure Only)

D VE

Prepare our children for the 21st century economy, strengthening math, science and technology competencies for our youth through an innovative public-private partnership. The former Holmes Street Elementary is situated in a Lansing neighborhood with low-income and vulnerable households particularly hard hit by the foreclosure crisis. This facility will act as an education and research center for K-12 disadvantaged students along with serving as the only technology incubator in the City of Lansing spurring technological advances. The 1920’s school will transform into a LEED certified center of technology empowerment for youth and the disadvantaged. The project will use a combination of geothermal and solar power. Outcomes of the project include ongoing; education for disadvantaged youth, worker retraining, entrepreneurial job creation, broadband investment, energy efficiency improvements, green infrastructure modernization and green energy production. Architectural planning is complete, volunteers and partner organizations are in place and private 30 Days From matching funds of $1 million are in place to begin immediate job creation. We anticipatReceipt

T O

Spartan Internet

Expected Completion Date

$

120,000,000

2,000,000

b u S 02262009

Submitted Requests - Not Approved

1226 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

The Village Food Service

Genesee Township

Project Name

Project Description

Start Date

Village Food Services

The Village Food Service Program is a For Profit venture created to foster economic development, job training, and community revitilization in the Beecher District of Northern Genesee County. This revitilization plan was initiated out a response to decades of economic decline and devastation job loss in the Beecher District. According to the latest 2007 unemployment statistics, 4 out of every 10 adults over the age of 18 are unemployed or on some form of govermental assistance. The Village Food Service is dedicated to providing high quality, healthy food to individuals, families, and various institutions through out Greater Genesee County. The Village Food Service has created a much needed employment base in the food industry. However, the Village's committment to create even more jobs depends on the expansion of their full service facility. Currently, the Village has contracts with Genesee County Parks/Recreation, local churches, schools, and govermental agencies. An additional 300,000.00 is needed to expand the Full Service Facility. An already in expanded facility fuels more and larger contracts, thus, creating more employment oppexistence

Crosswind Runway

The project of the Tuscola Area Airport Authority is a crosswind runway. This capital improvement to the airport will make more of a contribution to the business community and the local citizens. The project especially helps the airport and future economic development by increasing air traffic and improving safety. The Airport Authority develops future plans that will transform present airport facilities ito assets to the flying public that are customer-driven and need based. The Airport Authority insurance company give the airport the information that risk management requirements state that a 5000 foot runway is essential for jets to land at an airport more safely. The crosswind runway could be built in phases, which is contingent upon funding being available. The runway designed to be 5,000 feet long will allow more safety for business aircraft using the airport. This+K11 is vital in giving the Tuscola Area Airport the infrastructure to increase air traffic by having year-round all season access to the airport 6/1/2009

Indianfields Township

O R

Funding Request

1,400,000

6/1/2010

$

7,100,000

The project of the Tuscola Area Airport Authority is a crosswind runway. This capital improvement to the airport will make more of a contribution to the business community and the local citizens. The project especially helps the airport and future economic development by increasing air traffic and improving safety. The Airport Authority develops future plans that will transform present airport facilities ito assets to the flying public that are customer-driven and need based. The Airport Authority insurance company give the airport the information that risk management requirements state that a 5000 foot runway is essential for jets to land at an airport more safely. The crosswind runway could be built in phases, which is contingent upon funding being available. The runway designed to be 5,000 feet long will allow more safety for business aircraft using the airport. This+K11 is vital in giving the Tuscola Area Airport the infrastructure to increase air traffic by having year-round all season access to the airport 6/1/2009

6/1/2010

$

7,100,000

For years, Tuscola County Government has had a severe office space deficiency which has prevented the ability to conduct operations with maximum cost efficiency and convenience to the public. County operations are spread among 13 different buildings. This situation often requires the public to make multiple trips to buildings scattered throughout the community to obtain services. Besides the sheer lack of space, the problem is further compounded because maintaining, repairing, securing, paying utility costs, snow plowing and cleaning for 13 buildings is extremely inefficient and results in significant duplication of effort. 6/9/2009

5/11/2009

$

6,000,000

s

t s e

PP

Route (Infrastructure Only)

D VE

expansion of kitchen would take two months $

A T

Tuscola Area Airport

Expected Completion Date

O N

u q e

R d

Tuscola Area Airport

Indianfields Township

e t tt

i m

Crosswind Runway

ub

S Tuscola County

Tuscola County

02262009

Tuscola County Government Central Office Building

Submitted Requests - Not Approved

1227 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tuscola County

Tuscola County

Tuscola County

Tuscola County

Project Name

Project Description

Start Date

Expected Completion Date

Tuscola County Jail Facility

The current county jail is obsolete and has inadequate capacity with only 80 beds compared to current and projected needs of approximately 150 beds. In 2007, the Tuscola County Board of Commissioners directed that an updated plan be developed. Harrison-Landmark Architects was hired to conduct the plan update. Several alternatives were prepared. The ideal plan recommends a centralized pod type of internal jail monitoring station to replace the current antiquated monitoring station. This new design would enhance efficiency and improve safety for corrections officers and add 70 new jail beds. However, at this time it is not considered financially feasible without grant or foundation assistance. 8/9/2009

Tuscola County Government Expansion of Electronic Records System

For a county of modest financial means Tuscola County has many technological achievements. However, one technological advancement that the County needs to expand that would add tremendous operational efficiency is the electronic records system. County government is responsible for maintaining records essential to individuals, businesses and the community including: land transactions, birth, death, marriage, court, business start-up, property tax, prisoner, property value, drain, traffic and other tickets, dog licenses, payroll and many others. Organizing and filing this information is an extremely labor intensive activity. Expanding the electronics system by including all departments would strengthen recording, retrieval and maintenance of these vital records. 4/9/2009

Tuscola County Government Geographic Information System

O R

D VE $

9,000,000

12/10/2009

$

500,000

A countywide geographic system would enable quick and easy access to information organized on a geographic base that would strengthen planning, and the overall decision making process resulting in the most effective use of public funds. Numerous entities in the county would benefit including: Road Commission with road work planning-implementation, sewer/water system planning, land use planning/zoning, Health Department tracking of septic/water permits and food establishment inspections, property assessing, Equalization, local governmental units infrastructure locations. Almost all public and private sector entities would realize tremendous benefits from the ability to view and integrate multiple sets of data and information organized on a geographical basis. Most importantly this technology would added an important economic tool to assist in further job creation. 4/9/2009

12/11/2009

$

800,000

In 2007, Tuscola County adopted a Farmland Preservation Ordinance. The objective of this ordinance is to purchase targeted prime farmland as funding becomes available. Land is targeted that is under pressure for development so that these critical agricultural lands remain available for agricultural production for future generations. Parts of Tuscola County contain some of the most productive agricultural land in the world. Assuming a per acre cost of $2,000, approximately 5,000 acres of prime agricultural could be purchased with $10 million. 4/9/2009

12/10/2009

$

10,000,000

T O

7/11/2009

Funding Request

Route (Infrastructure Only)

P P A

N s

t s e

Tuscola County

Tuscola County

Tuscola County

Tuscola County

R d

i m

e t tt

Purchase of Prime Agricultural Lands

b u S 02262009

u q e

Submitted Requests - Not Approved

1228 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tuscola County

Project Name

Project Description

Start Date

Sirolli Enterprise Facilitation

The County has become an economic development leader in the state through implementation of the world renowned Sirolli Program of Enterprise Facilitation www.sirolli.com. Tuscola County took action several years ago to reverse disconcerting economic trends by working diligently in a partnership with public/private entities and individuals to rebuild the economy through implementation of enterprise facilitation. Tuscola County recognizes that a significant portion of new jobs are created by new and existing local businesses, and that new jobs created by local entities are most likely to stay local in this global economy. This request is to obtain grant/foundation funding to assure the long-term operational stability of the Sirolli Institute Program of Enterprise Facilitation in Tuscola County. By obtaining a broad base of public, private and individual sources of funds, the program is strengthened. Funding would also assist in advancing Tuscola County into a total Entrepreneurial Community. 4/9/2009

County-wide

Business Incubator

Tuscola County at this time does not have a publicly owned or operated business incubator. This has caused new businesses to locate outside of Tuscola County. This project would allow for the purchase of land or a building, which would be turned into a state of the art business incubator. Support for the project would be provided by the Tuscola County Economic Development Corporation and a host of other business counseling agencies. The counseling would be provided to the local businesses at no cost, or low cost. 6/1/2009

County-Wide

Expand the marketing and promotion of tourism-related businesses and events throughout our area. By promoting the many positive aspects of our area we create a stronger more stable community and a desire for others to want to invest here. This promotion will be performed via the Web site www.thumbtourism.org, radio, print media and Travel Michigan. Currently the Thumb Area Tourism Council, Inc. (TATC), an established Caro-based non-profit 501c is prepared to deliver these services. Further, TATC is reconized by Travel Michigan as the Destination Marketing Tourism Expansion and Promotion Marketing Organization to serve and market this area. 4/1/2009

County-wide

Tuscola County businesses have very limited access venture capital and gap financing. This project would provide much needed funding to allow existing and new businesses to create a large number of jobs in Tuscola County. Match wuld come from the Tuscola County Revolving Loan Fund. 6/1/2009

Tuscola County

Tuscola County

Tuscola County

Tuscola County

Tuscola County

County-Wide

200,000

6/1/2010

$

2,000,000

12/1/2009

$

232,500

6/1/2010

$

2,000,000

Due to limited funding, Tuscola County has not been able to obtain a county-wide economic development program over the past several years. The project would allow all public and private sectors from all geographic parts of the county to provide muchneeded input into a county-wide comprehensive program. This project will allow for a dramatic increase in job retention and job creation in Tuscola County. 6/1/2009

6/1/2010

$

300,000

Tuscola County and its Economic Development Corporation have been working with a local unit of government on the start-up and expansion of an industrial park. At this time, infrastructure improvements are needed at the park. These improvements would include water lines, sewer lines and an upgrade of a Class A roadway that will provide much needed manufacturing and agricultural processing jobs in Tuscola County. 6/1/2009

6/1/2010

$

2,200,000

02262009

s

t s e

O N

Create a Venture Capital Fund

d e tt

t i m

Economic Development Comprehensive Program

Industrial Park Infrastructure

e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

qu

b u S

County-Wide

PP

O R

Funding Request

12/11/2009

A T

Tuscola County

Expected Completion Date

1229 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tuscola County

Tuscola County

Tuscola County

Tuscola County

Project Name

Project Description

Start Date

Expected Completion Date

Tuscola County Government Central Office Building

For years, Tuscola County Government has had a severe office space deficiency which has prevented the ability to conduct operations with maximum cost efficiency and convenience to the public. County operations are spread among 13 different buildings. This situation often requires the public to make multiple trips to buildings scattered throughout the community to obtain services. Besides the sheer lack of space, the problem is further compounded because maintaining, repairing, securing, paying utility costs, snow plowing and cleaning for 13 buildings is extremely inefficient and results in significant duplication of effort. 6/9/2009

Tuscola County Jail Facility

The current county jail is obsolete and has inadequate capacity with only 80 beds compared to current and projected needs of approximately 150 beds. In 2007, the Tuscola County Board of Commissioners directed that an updated plan be developed. Harrison-Landmark Architects was hired to conduct the plan update. Several alternatives were prepared. The ideal plan recommends a centralized pod type of internal jail monitoring station to replace the current antiquated monitoring station. This new design would enhance efficiency and improve safety for corrections officers and add 70 new jail beds. However, at this time it is not considered financially feasible without grant or foundation assistance. 8/9/2009

Tuscola County Government Expansion of Electronic Records System

For a county of modest financial means Tuscola County has many technological achievements. However, one technological advancement that the County needs to expand that would add tremendous operational efficiency is the electronic records system. County government is responsible for maintaining records essential to individuals, businesses and the community including: land transactions, birth, death, marriage, court, business start-up, property tax, prisoner, property value, drain, traffic and other tickets, dog licenses, payroll and many others. Organizing and filing this information is an extremely labor intensive activity. Expanding the electronics system by including all departments would strengthen recording, retrieval and maintenance of these vital records. 4/9/2009

O R

D VE $

6,000,000

7/11/2009

$

9,000,000

12/10/2009

$

500,000

Tuscola County Government Geographic Information System

A countywide geographic system would enable quick and easy access to information organized on a geographic base that would strengthen planning, and the overall decision making process resulting in the most effective use of public funds. Numerous entities in the county would benefit including: Road Commission with road work planning-implementation, sewer/water system planning, land use planning/zoning, Health Department tracking of septic/water permits and food establishment inspections, property assessing, Equalization, local governmental units infrastructure locations. Almost all public and private sector entities would realize tremendous benefits from the ability to view and integrate multiple sets of data and information organized on a geographical basis. Most importantly this technology would added an important economic tool to assist in further job creation. 4/9/2009

12/11/2009

$

800,000

Purchase of Prime Agricultural Lands

In 2007, Tuscola County adopted a Farmland Preservation Ordinance. The objective of this ordinance is to purchase targeted prime farmland as funding becomes available. Land is targeted that is under pressure for development so that these critical agricultural lands remain available for agricultural production for future generations. Parts of Tuscola County contain some of the most productive agricultural land in the world. Assuming a per acre cost of $2,000, approximately 5,000 acres of prime agricultural could be purchased with $10 million. 4/9/2009

12/10/2009

$

10,000,000

T O

P P A

5/11/2009

Funding Request

Route (Infrastructure Only)

N s

Tuscola County

Tuscola County

d e tt

Tuscola County

Tuscola County

t i m

b u S

Tuscola County

Tuscola County

02262009

t s e

qu

e R

Submitted Requests - Not Approved

1230 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Tuscola County

Project Name

Project Description

Start Date

Sirolli Enterprise Facilitation

The County has become an economic development leader in the state through implementation of the world renowned Sirolli Program of Enterprise Facilitation www.sirolli.com. Tuscola County took action several years ago to reverse disconcerting economic trends by working diligently in a partnership with public/private entities and individuals to rebuild the economy through implementation of enterprise facilitation. Tuscola County recognizes that a significant portion of new jobs are created by new and existing local businesses, and that new jobs created by local entities are most likely to stay local in this global economy. This request is to obtain grant/foundation funding to assure the long-term operational stability of the Sirolli Institute Program of Enterprise Facilitation in Tuscola County. By obtaining a broad base of public, private and individual sources of funds, the program is strengthened. Funding would also assist in advancing Tuscola County into a total Entrepreneurial Community. 4/9/2009

County-wide

Business Incubator

Tuscola County at this time does not have a publicly owned or operated business incubator. This has caused new businesses to locate outside of Tuscola County. This project would allow for the purchase of land or a building, which would be turned into a state of the art business incubator. Support for the project would be provided by the Tuscola County Economic Development Corporation and a host of other business counseling agencies. The counseling would be provided to the local businesses at no cost, or low cost. 6/1/2009

County-Wide

Expand the marketing and promotion of tourism-related businesses and events throughout our area. By promoting the many positive aspects of our area we create a stronger more stable community and a desire for others to want to invest here. This promotion will be performed via the Web site www.thumbtourism.org, radio, print media and Travel Michigan. Currently the Thumb Area Tourism Council, Inc. (TATC), an established Caro-based non-profit 501c is prepared to deliver these services. Further, TATC is reconized by Travel Michigan as the Destination Marketing Tourism Expansion and Promotion Marketing Organization to serve and market this area. 4/1/2009

County-wide

Tuscola County businesses have very limited access venture capital and gap financing. This project would provide much needed funding to allow existing and new businesses to create a large number of jobs in Tuscola County. Match wuld come from the Tuscola County Revolving Loan Fund. 6/1/2009

Tuscola County

Tuscola County

Tuscola County

Tuscola County

Tuscola County

County-Wide

200,000

6/1/2010

$

2,000,000

12/1/2009

$

232,500

6/1/2010

$

2,000,000

Due to limited funding, Tuscola County has not been able to obtain a county-wide economic development program over the past several years. The project would allow all public and private sectors from all geographic parts of the county to provide muchneeded input into a county-wide comprehensive program. This project will allow for a dramatic increase in job retention and job creation in Tuscola County. 6/1/2009

6/1/2010

$

300,000

Industrial Park Infrastructure

Tuscola County and its Economic Development Corporation have been working with a local unit of government on the start-up and expansion of an industrial park. At this time, infrastructure improvements are needed at the park. These improvements would include water lines, sewer lines and an upgrade of a Class A roadway that will provide much needed manufacturing and agricultural processing jobs in Tuscola County. 6/1/2009

6/1/2010

$

2,200,000

Nutt Branch of Akron Centerline

Approximately 5,000 foot open channel drainage that is the outlet for proposed Akron Main Street Tile Project. Upgrade and cleanout of 40 years of acumulated silt in drain. 202 acres in the watershed district. Agricultural Drainage;Residential Drainage; Improved Health Conditions and Removal of Standing and Stagnant Water. 4/9/2009

Fall 2009

$

Tuscola County Drain Akron township T14N, Commissioner R8E Tuscola County

02262009

s

t s e

O N

qu

Create a Venture Capital Fund

d e tt

t i m

Economic Development Comprehensive Program

e R

Submitted Requests - Not Approved

Route (Infrastructure Only)

D VE $

b u S

County-Wide

PP

O R

Funding Request

12/11/2009

A T

Tuscola County

Expected Completion Date

141,684 Yes

1231 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Akron Main Street Tile

Proposed storm sewer serving commercial & agricultural enterprises as well as residents of Village and Township. Agricultural Drainage; Residential Drainage; Improved Health Conditions and Removal of Standing and Stagnant Water. THIS PROJECT WILL NOT BE BUILT WITHOUT OUTSIDE FUNDING OPPORTUNITIES. 4/9/2009

Nutt Branch of Akron Centerline

Approximately 5,000 foot open channel drainage that is the outlet for proposed Akron Main Street Tile Project. Upgrade and cleanout of 40 years of acumulated silt in drain. 202 acres in the watershed district. Agricultural Drainage;Residential Drainage; Improved Health Conditions and Removal of Standing and Stagnant Water. 4/9/2009

Tuscola County Drain Akron township T14N, Commissioner R8E Tuscola County

Akron Main Street Tile

Proposed storm sewer serving commercial & agricultural enterprises as well as residents of Village and Township. Agricultural Drainage; Residential Drainage; Improved Health Conditions and Removal of Standing and Stagnant Water. THIS PROJECT WILL NOT BE BUILT WITHOUT OUTSIDE FUNDING OPPORTUNITIES. 4/9/2009

Village of Byron Village of Byron Village of Byron

sanitary sewer collection system upgrades LIFT STATION UPGRADES LAGOON UPGRADES

Reline 4 miles of sanitary sewer Upgrade two of the village's sanitary sewer lift stations Reline two existing lagoons and add a third cel

Multi-Purpose Trail Project

The Village of Edwardsburg would like to enhance their commmunity by installing mult purpose trails. Their vision for this project would be a trail which would create a trail ring around the border of their community as well as create a path to their new Sports Complex located on the West side of the Village. The trail would encourage residents to walk or bike within the community as well as use the trail as a green means of accessing their sports complex. The trail would be a porous pavement to encourage grounwater recharge and would minimize if not eliminate storm water runoff from the trail. 4/9/2009

Gunn Park Facility Improvements

Gunn Park is an element of the Village which could use upgrading. The Village of Edwardsburg would like to have several projects addressed on this site and they are as follows: 1) Install public restrooms with electric and water service, 2) Remove the existing parking lot and replace with a porous pavement to encourage groundwater recharge 3) Upgrade the boat launch. The Park and the Lake are key features of the community and these projects will create a great asset for the community. 4/9/2009

Tuscola County Drain Akron township T14N, Commissioner R8E Tuscola County

Tuscola County Drain Akron township T14N, Commissioner R8E Tuscola County

Village of Byron Village of Byron Village of Byron

Village of Edwardsburg Village of Edwardsburg

Village of Edwardsburg Village of Edwardsburg

Expected Completion Date

T O

Fall 2009

8/31/2009 8/3/2009 8/31/2009

N s

t s e

u q e

R d

D VE $

384,000 Yes

$

141,684 Yes

Fall 2009

$

384,000 Yes

11/31/2010 10/2/2009 7/31/2010

$ $ $

1,200,000 500,000 2,000,000

12/10/2009

$

Numerous locations throughtout the 1,150,000 Village

12/10/2009

$

O R

P P A

Funding Request

Route (Infrastructure Only)

Fall 2009

650,000 Gunn Park

e t t

The existing and potential businesses in the downtown area of the Village would be greatly enhanced by a streetscape project. This project has been the subject of numerous public input meetings over the past year. The project would consist of new nostalgia style street lighting, with park benches, bike racks, drinking fountains, nostalgia style street signs, landscape features, connecting sidewalks, and some brick paving in key locations. The project is being promoted by the Edwardsburg Improvement Association as one method of saving the downtown business district Downtown Streetscape Improvement Project from extinction. 5/9/2009

t i m

ub

Village of Edwardsburg Village of Edwardsburg

S

Village of Edwardsburg Village of Edwardsburg

02262009

Downtown Facade Improvement Project

There are five businesses in the downtown area of the Village which would be greatly enhanced by a facade improvement project. The charm of the Village would be brought out and conveyed to the vehicular traffic on US-12 with this project. This project would enhance the commercial business climate in the Village. The project would consist of facade improvements to five of the existing businesses in the Village. 5/9/2009

Submitted Requests - Not Approved

12/10/2009

12/10/2009

$

US-12 from Section Street east 1,650,000 to the Railroad

$

US-12 from Section Street east 250,000 to the Railroad

1232 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Expected Completion Date

Village of Edwardsburg Village of Edwardsburg

Downtown Facade Improvement Project

Village of Garden Village of Garden

Village of Garden Villagae of Garden

water tower painting water shield box

Village of Garden

Village of Garden

water meters and water meter reader

Village of Garden

Village of Garden

garage doors

Village of Garden

Village of Garden

Village of Garden Village of Garden

Village of Garden Village of Garden

valve repair to water lines repair and resurface roads and shoulders in Village insulation

There are five businesses in the downtown area of the Village which would be greatly enhanced by a facade improvement project. The charm of the Village would be brought out and conveyed to the vehicular traffic on US-12 with this project. This project would enhance the commercial business climate in the Village. The project would consist of facade improvements to five of the existing businesses in the Village. 5/9/2009 water tower painting, inside and out, to preserve and protect the water supply for our residents June 1,2009 to protect the worker while working on water lines in the ground June 1 2009 replace and repair water meters in households to get a more accurate account of water usage 5/1/2009 replace uninsulated and warped doors with insulated with insulated soorss with automatic stops 5/1/2009 replace valves, bolts and o-rings to water lines in the ground to protect the water service to our residents 5/1/2009 repair and replace roads inside of Village of Garden to make driving, walking and biking, safer and more efficient 5/1/2009 to insulate the office and buildings to use less energy 5/1/2009

Dual Water Supply Line

12/10/2009

D VE $

US-12 from Section Street east 250,000 to the Railroad

June 30,2009 for future

$ $

50,000 yes 4,000 yes

8/30/2009

$

40,000 yes

O R

P P A

Funding Request

Route (Infrastructure Only)

5/30/2009

yes

9/30/2009

$

100,000 yes

Sep. 30, 2009 10/31/2009

$ $

410,975 yes 10,000 yes

The Village of Kingston has been hampered by low water pressure in the downtown area that is not able to provide adequate fire protection. An engineering study has been done demonstrating the need for a dual water supply line project. It is anticipated that the Michigan Department of Environmental Quality will mandate that the Village make this necessary improvement in the near future. This project will allow for downtown businesses to save money on fire insurance and increase potential future job growth. This can mainly be attributed to the fact that most of the existing pipes are 6 inch in diameter or less. This severely restricts the volume of water that can be delivered for the water mains in the system are old. 6/1/2009

6/1/2010

$

105,000

The Village of Kingston has been hampered by low water pressure in the downtown area that is not able to provide adequate fire protection. An engineering study has been done demonstrating the need for a dual water supply line project. It is anticipated that the Michigan Department of Environmental Quality will mandate that the Village make this necessary improvement in the near future. This project will allow for downtown businesses to save money on fire insurance and increase potential future job growth. This can mainly be attributed to the fact that most of the existing pipes are 6 inch in diameter or less. This severely restricts the volume of water that can be delivered for the water mains in the system are old. 6/1/2009

6/1/2010

$

105,000

The Village of Kingston has been hampered by low water pressure in the downtown area that is not able to provide adequate fire protection. An engineering study has been done demonstrating the need for a dual water supply line project. It is anticipated that the Michigan Department of Environmental Quality will mandate that the Village make this necessary improvement in the near future. This project will allow for downtown businesses to save money on fire insurance and increase potential future job growth. This can mainly be attributed to the fact that most of the existing pipes are 6 inch in diameter or less. This severely restricts the volume of water that can be delivered for the water mains in the system are old. 6/1/2009

6/1/2010

$

105,000

T O

N s

Village of Kingston

Village of Kingston

t s e

u q e

R d

Village of Kingston

Village of Kingston

i m

b u S Village of Kingston

Village of Kingston

02262009

e t tt

Dual Water Supply Line

Dual Water Supply Line

Submitted Requests - Not Approved

1233 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Start Date

Water System Supply Improvements Concord Street San. Sewer & Water Extension.

Mattawan

Water System Hydraulic Improvements #1

Extend watermain on West Robinson to Glidden, Extend watermain at Concord North along east City Limits to McGillen then West, Extend watermain on McGillen north to Freedom Lane. These watermain extensions will improve water circulation and quality by eliminating long dead end watermains. Replace deteriorating fire hydrants in system to increase reliability available hydrants. 7/1/2009

Mattawan

Extend water and sanitary sewer service on 25th Street to provide utility service to the new annexation area within the Village. Utility service will help to aid development in 25th Street San. Sewer and Water Extension this area and job creation. 6/1/2009

Mattawan

Village of Mattawan

Mattawan

Village of Mattawan

Project Description

Construction of a new Well #4 to meet maximum day water demands so as to continue to be able to meet residential demand while supporting ongoing commercial expansion of MPI and other industries. Rehabilitation of Concord Street elevated water storage tank consisting of valve repairs, site improvements, corrosion repairs and recoating. 6/1/2009 Extend water and sewer service on Concord Street to east Village limits to provide service to existing residential customers. 7/1/2009

Village of Mattawan

Village of Mattawan

Project Name

Expected Completion Date

2/1/2010

D VE $

500,000

$

1,000,000

6/1/2010

$

850,000

12/1/2009

$

400,000

6/1/2010

O R

P P A

Funding Request

Village of Mattawan

Mattawan

French Tower Watermain

Village of Mattawan

Mattawan

Ryan Road Watermain Extension

Extend watermain from the French Street water tower south across I94 to Freedom Lane to provide a redundant connection of the water tower to the water system to increase system reliability. Extend watermain on Ryan Road to East Robinson to provide water service to this area of the Village.

6/1/2009

12/1/2009

$

300,000

T O

N s

7/1/2009

12/1/2009

$

600,000

6/1/2009

12/1/2009

$

200,000

Village of Mattawan

Mattawan

East Robinson Watermain Extension

Extend watermain on East Robinson to Main Street to provide water service to this area of the Village, eliminate the long dead end on Ryan Road which will improve water circulation and water quality to system users.

Village of Mattawan

Mattawan

Ryan Road Sanitary Sewer Extension

Extend sanitary sewer on Ryan Road to provide service to this are of the Village

7/1/2009

6/10/2009

$

750,000

Village of Mattawan

Mattawan

Glidden Street Watermain Extension

Extend watermain on Glidden Street to Front Avenue to eliminate the long dead end which will improve water circulation and water quality to system users. 6/1/2009

12/1/2009

$

300,000

Replace asbestos-cement watermain along Concord Street to Concord Street Water Tower to improve critical system reliability and allow for future road vertical realignment and reconstruction. 6/1/2009

12/1/2009

$

230,000

2/1/2010

$

500,000

6/1/2010

$

1,000,000

6/1/2010

$

850,000

12/1/2009

$

400,000

7/1/2009

12/1/2009

$

600,000

6/1/2009

12/1/2009

$

200,000

Village of Mattawan

Mattawan

Village of Mattawan

Mattawan

Village of Mattawan

Mattawan

Village of Mattawan

Village of Mattawan

Mattawan

Mattawan

Concord Street Watermain Replacement

d e tt

Water System Supply Improvements Concord Street San. Sewer & Water Extension.

it

S

m b u

Water System Hydraulic Improvements #1

q e R

Construction of a new Well #4 to meet maximum day water demands so as to continue to be able to meet residential demand while supporting ongoing commercial expansion of MPI and other industries. Rehabilitation of Concord Street elevated water storage tank consisting of valve repairs, site improvements, corrosion repairs and recoating. 6/1/2009 Extend water and sewer service on Concord Street to east Village limits to provide service to existing residential customers. 7/1/2009 Extend watermain on West Robinson to Glidden, Extend watermain at Concord North along east City Limits to McGillen then West, Extend watermain on McGillen north to Freedom Lane. These watermain extensions will improve water circulation and quality by eliminating long dead end watermains. Replace deteriorating fire hydrants in system to increase reliability available hydrants. 7/1/2009

Extend water and sanitary sewer service on 25th Street to provide utility service to the new annexation area within the Village. Utility service will help to aid development in 25th Street San. Sewer and Water Extension this area and job creation. 6/1/2009

Village of Mattawan

Mattawan

French Tower Watermain

Village of Mattawan

Mattawan

Ryan Road Watermain Extension

02262009

e u

st

Extend watermain from the French Street water tower south across I94 to Freedom Lane to provide a redundant connection of the water tower to the water system to increase system reliability. Extend watermain on Ryan Road to East Robinson to provide water service to this area of the Village.

Submitted Requests - Not Approved

Route (Infrastructure Only)

1234 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Expected Completion Date

Start Date

Village of Mattawan

Mattawan

East Robinson Watermain Extension

Extend watermain on East Robinson to Main Street to provide water service to this area of the Village, eliminate the long dead end on Ryan Road which will improve water circulation and water quality to system users.

Village of Mattawan

Mattawan

Ryan Road Sanitary Sewer Extension

Extend sanitary sewer on Ryan Road to provide service to this are of the Village

7/1/2009

6/10/2009

Village of Mattawan

Mattawan

Glidden Street Watermain Extension

Extend watermain on Glidden Street to Front Avenue to eliminate the long dead end which will improve water circulation and water quality to system users. 6/1/2009

12/1/2009

Concord Street Watermain Replacement

Replace asbestos-cement watermain along Concord Street to Concord Street Water Tower to improve critical system reliability and allow for future road vertical realignment and reconstruction. 6/1/2009

Industrial Park Phase II

8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension

Industrial Park Phase III

8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension

Industrial Park Phase II

8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension

Industrial Park Phase III

8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension

Industrial Park Phase II

8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension

Industrial Park Phase III

8" Water Main Extension 8" Sanitary Sewer Extension 8" - 15" Sanitary Sewer Extension

Village of Mattawan

Village of Mayville

Village of Mayville

Village of Mayville

Village of Mayville

Village of Mayville

Village of Mayville

Mattawan

Mayville

Mayville

Mayville

Mayville

Mayville

Mayville

d e t

Village of Pigeon

Village of Pigeon, Winsor Township Michiagn Avenue Reconsruction

Village of Reese

May 2009, all necessary design work and environmental reviews or could reasonably be completed, such that work on the projects could begin within 180 days of the federal government releasing funds to the state of Michigan and the project approved and funds available to the Reese. Lagoon Improvement

tt i m

$

300,000

$

750,000

$

300,000

P P A

12/1/2009

$

230,000

3/1/2009

4/1/2009

$

190,000 M-24

3/1/2009

4/1/2009

$

195,000 M-24

3/1/2009

4/1/2009

$

190,000 M-24

3/1/2009

4/1/2009

$

195,000 M-24

3/1/2009

4/1/2009

$

190,000 M-24

3/1/2009

4/1/2009

$

195,000 M-24

N s

st

e u

q e R

T O

6/1/2009

12/1/2009

Funding Request

Route (Infrastructure Only)

O R

This will be a total Reconstruction of East Michigan Ave. from M-142 to Sturm Road. The current 4" Mains were installed in the early 1950's. We will be replacing the current 4" water Mains to 8". This will help for a better flow for the residents and businesses. We are also replacing the sewer lines which have been in place since before 1950. Also the road base and surface will be replaced and built to MDOT Class "A". This street is the main entrance way to the Coopertive Elevator Co. one of the largest Grain Elevators in the country. Spring 2009

Fall 2009

D VE

$

East Michigan Ave. From M-142 to 1,961,791 Sturm Rd

b u S

02262009

Clean out the 23 acre lagoon system. Expand the system by one more cell. This will allow the creation of a light industrial and technology park to be developed.

Submitted Requests - Not Approved

within two years of start date

1235 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Project Name

Project Description

Start Date

Village of Reese

Summer of 2009 to be completed within the required guide lines

Village of Reese

May 2009, all necessary design work and environmental reviews or could reasonably be completed, such that work on the projects could begin within 180 days of the federal government releasing funds to the state of Michigan and the project approved and funds available to the Reese. Lagoon Improvement

Clean out the 23 acre lagoon system. Expand the system by one more cell. This will allow the creation of a light industrial and technology park to be developed.

Village of Reese

Summer of 2009 to be completed within the required guide lines

Green Technology Light Industrial Park Development

Development of a Green Technology and Light Industrial Park

MANHOLE REHABILITATION

The Village has been battling a deteriorating sanitary sewer system that is approaching 50 years old. We habe been diligent in our maintenance programs with CIPP lining, as funds are available, but the deteriorating manholes continue to allow storm water into our sanitary sewer system, which puts our lagoons at risk of overflowing on an annual basis. 4/1/2009

Reconstruct Runway 9L/27R

This construction project will replace the deteriorated pavement of Detroit Metro Airport's crosswind Runway 9L/27R and its associated drainage, electrical, lighting and sign systems.

Village of Sebawing

SEBEWAING

Wayne County Airport Authority Wayne County

Wayne County Airport Authority Wayne County Wayne County Airport Authority Wayne County Airport Authority Wayne County Airport Authority Wayne County Airport Authority

Green Technology Light Industrial Park Development

Development of a Green Technology and Light Industrial Park

two years

d e t

T O

100,000

D VE

N s

within two years of start date

two years

$

100,000

$

VARIOUS SANITARY 150,000 MANHOLES

4/20/2009

11/15/2009

$

34,650,000

This construction project will mill and resurface the pavement of Runway 3L/21R south of Runway 9L/27R and portions of pavement of connector taxiways PP, M-1 and F. This project also includes the full reconstruction of Runway 3L/21R pavement located in the intersection of Ruway 9L/27R and Taxiway V. The scale and magniture of this project is large and will require multiple construction crews working mulitiple shifts to complete this critical project in October 2009. 4/20/2009

10/11/2009

$

21,400,000

4/20/2009

9/10/2010

$

10,525,000

5/26/2009

11/15/2009

$

25,350,000

4/20/2009

9/10/2010

$

8,225,000

q e R

Reconstruct Taxiway H

This construction project will replace the deteriorated Taxiway V pavement west of Runway 3L/21R and its associated drainage, electrical, lighting and sign systems. This construction project will replace the deteriorated pavement of Taxiway W and its associated drainage, electrical, lighting and sign systems. This construction project will replace the deteriorated pavement of Taxiway F and its associated drainage, electrical, lighting and sign systems. This construction project will replace the deteriorated pavement of Taxiway H and its associated drainage, electrical, lighting and sign systems.

4/20/2009

9/10/2010

$

3,160,000

Demolition of Hangar 2

This project will disconnect all utilities serving this hangar and demolish the structure. Removal of the hangar will clear the way for future job and revenue producing development on this site at Willow Run airport. 5/26/2009

9/11/2009

$

2,300,000

Wayne County Airport Authority Wayne County

Extend Taxiway G

This construction project will extend Taxiway G from Taxiway F to Runway 9L/27R and will include associated drainage, electrical, lighting and sign systems.

4/20/2009

9/10/2010

$

3,160,000

Wayne County Airport Authority Wayne County

Reconstruct Taxiway K-12

This construction project will replace the deteriorated pavement of Taxiway Connector K-12 and its associated drainage, electrical, lighting and sign systems. 4/20/2009

9/10/2010

$

1,400,000

Wayne County

Reconstruct Taxiway V

Wayne County

Reconstruct Taxiway W

ub

Wayne County Wayne County

S

Wayne County Airport Authority Wayne County

02262009

Reconstruct Taxiway F

Submitted Requests - Not Approved

Route (Infrastructure Only)

P P A

st

e u

Funding Request

$

O R

Rehabilitate Southern Portion of Runway 3L/21R

tt i m

Expected Completion Date

1236 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Wayne County Airport Authority Wayne County Wayne County Airport Authority Wayne County

Wayne County Airport Authority Wayne County Wayne County Airport Authority Wayne County

Wayne County Airport Authority Wayne County Wayne County Airport Authority Washtenaw County Wayne County Airport Authority Wayne County Wayne County Airport Authority Wayne County

Woodward Avenue Action Association

Detroit

Project Name

Project Description

Construct Rogell-Dingell Drive Road Connector Taxiway D Electrical Improvements

Start Date

Expected Completion Date

This project consists will design and construct the vehicular access ramp from Northbound Rogell to Southbound Dingell Drive. Once complete, this ramp will decrease the travel distance by hotel and rental car buses, taxis/sedans, and other vehicles between the McNamara Terminal and the North Terminal and thus reduce emissions and improve air quality. 8/11/2009 This project will design and construct modifications and improvements to the electrical system associated with Taxiway "D". 5/26/2009

9/10/2010

Funding Request

D VE $

3,500,000

$

632,000

$

8,000,000

5/30/2010

$

1,100,000

5/30/2010

$

1,400,000

11/15/2009

Route (Infrastructure Only)

Expand General Aviation Ramp (East Side)

This project will design and construct a multi-bay facility for the storage and maintenance of Aircraft Rescue Fire Fighting equipment and Snow Removal Equipment. This project includes installation of utilities to the site and the required site improvements. 7/29/2009 This project will design and construct an expansion of the aircraft apron on the east side of the Willow Run airport. 7/29/2009

Upgrade Water and Sanitary Sewer (East Side) Hangar 1 Electrical Upgrade and Office Demolition

This project will design and construct the replacement of the 1940's water and sanitary sewer infrastructure on the east side of the airport. The replacement system will provide the necessary systems to support future development on the east side of the airport. 7/29/2009 This project will design and construct electrical upgrades. HVAC improvements, and upgrades to existing office spaces in Hangar 1. 7/29/2009

5/30/2010

$

1,000,000

Wildlife Fence Replacement

This project will design and construct replacement of approximately 10,000 linear feet of fence on the east side of the airport. Obstruction lighting and associated gate are included as part of this project. 5/26/2009

11/15/2009

$

2,105,000

Crack Seal Runway 5L/23R

This project will replace the joint sealant on Runway 5L/23R.

11/15/2009

$

200,000

Woodward Avenue Byway Welcome Center

Funding for the Woodward Avenue Byway Welcome Center to include economic and job development center, training entrepreunerial and 'green' start-ups along Woodward, technology and arts incubator, sustainable agricultural, community programming, visitor and tourism. WA3 has obtained 2006 and 2007 Federal National Scenic Byway funding to support. Detailed needs assessments and funding anlaysis have been completed and project is ready to move forward at location identified in Detroit at the former American Beauty Building on Woodward. 6/1/2009

6/1/2012

$

2,500,000 M1

9/10/2009

$

3,895,000

Construct Aircraft Rescue, Fire Fighting & Snow Removal Equipment Facility

T O

s t s

-N

P P A 5/26/2009

e u

eq

O R 5/30/2010

R d

e t tt

i m

b u S Copper Country Intermediate School District

City of Hancock

02262009

Copper Country Intermediate School District

LEED (Leadership in energy and Environmental Design) Certified Project Architect Diekema Hamann Renovation of Technical Education Center New Roof, Decking, and Insulation, New Energy Efficient Mechanical System Upgrade Classrooms Infrastructure for Technology and equipment Replace windows, curtain wall and frame work with energy efficient units, Replace all doors and hardware, Replace toilets, sinks and plumbing with water and energy conserving efficient units Remove asbestos based floor tiles and ceiling and replace, Improve accessibility for students that have disabilities, Replace all lighting with energy efficient units, Install air handlers for indoor air quality and add Air Conditioning, New classroom furniture to meet the needs for changes in curriculum Programs to be housed in the building would be for the Technical Education Center. Approximately 4000 square feet of the space is currently used for high school education, while the balance of space, 10,000 square feet will be renovated. Minor 120 days after entry additions will accommodate ADA compliance issues. A culinary arts program is planned for the north end of the building. It would contain k notification of Funding

Submitted Requests - Not Approved

1237 of 1238

Michigan Federal Economic Recovery - Request List

Location City or Township

Submitting Agency

Northridge Academy

Flint

Project Name

Project Description

Start Date

Expected Completion Date

Northridge Academy

The project comprises updating and renovation of 11 classrooms, a gymnasium and bathrooms in a 12-year-old, K-8 public school academy in the heart of Flint, Michigan. An addition is planned to house a fine and performing arts program in a community that has seen unprecedented economic decline as well as a virtual elimination of arts programming for children. The school serves a 250-student population with a free-and reduced lunch percentage at 99.9%.

D VE $

O R

T O

Funding Request

Route (Infrastructure Only)

1,100,000

P P A

N s

t s e

u q e

R d

e t tt

i m

b u S 02262009

Submitted Requests - Not Approved

1238 of 1238

Related Documents

Welfare
May 2020 18
Michigan
December 2019 35