METRADOS Γrea del terreno: 7 π₯ 6 = 42π2 Volumen de excavaciΓ³n para cimiento a 0.80 y 0.60: Eje 1-1 y 2-2: (7π₯0.8π₯0.4)π₯2
= 4.48π3
(5.12π₯0.8π₯0.4)π₯2 = 1.6384π3 3π₯0.8π₯0.4
= 0.96π3
2.87π₯0.8π₯0.4
= 0.9184π3
1.7π₯0.6π₯0.3
= 0.306π3
2π₯0.6π₯0.3
= 0.36π3
2.85π₯0.6π₯0.3
= 0.513π3
TOTAL DE VOLUMEN
= 9.18ππ
Volumen a vaciar para sobrecimiento: Eje 1-1 y 2-2: (6.25π₯0.3π₯0.25) = 0.47π3 (5.15π₯0.3π₯0.25) = 0.39π3 (5.25π₯0.3π₯0.25)π₯2 = 0.40π3 = 0.908π3
(2.87 + 2.63 + 2 + 0.9 + 2 + 1.7)π₯0.3π₯0.25 TOTAL DE VOLUMEN
= π. ππππ
Encofrado y desencofrado de sobrecimiento: (6.25π₯0.3) = 1.875π3 (5.15π₯0.3) = 1.545π3 (5.25π₯0.3)π₯2 = 3.15π3 (2.87 + 2.63 + 2 + 0.9 + 2 + 1.7)π₯0.3 TOTAL PARA ENCOFRAR
= 3.63π3
= ππ. πππ
Falso piso de 2β: (6.75π₯5.75) = 38.81π2 (2.87 + 2.63 + 2 + 0.9 + 2 + 1.7)π₯0.25
= 3.025π2
TOTAL PARA EL FALSO PISO(DIFERENCIA)
= ππ. πππππ
Solado para zapata de 3β: (0.8π₯0.8π₯0.0762)π₯4 = 0.195π3 (1π₯1π₯0.0762) = 0.0762π3 TOTAL DE VOLUMEN PARA SOLADO DE ZAPATAS = π. ππππ
Volumen de zapatas: Zapata esquinera: (0.8π₯0.8π₯0.5)π₯4 = 1.28π3
Zapata perimetral: (1π₯1π₯0.5) = 0.5π3
Metrado de muro de cabeza (altura de muro 2.40m) (3.55π₯0.25π₯2.34) = 2.132π3 (2.70π₯0.25π₯1.8) = 1.215π3 (4.25π₯0.25π₯2.4) = 2.55π3 (3.55π₯0.25π₯2.34) = 2.132π3 (2π₯0.25π₯1.8) = 0.9π3 (2.85π₯0.25π₯2.4) = 1.71π3 (2.4π₯0.25π₯1.8) = 1.08π3 (4.05π₯0.25π₯2.4) = 2.43π3 (12.1π₯0.25π₯2.4) = 7.26π3 TOTAL DE VOLUMEN PARA ASENTAR MURO DE CABEZA = ππ. ππππ3
Metrado de columnas(volumen) (0.25π₯0.25π₯2.2)π₯9 = 1.238π3 TOTAL DE VOLUMEN A VACIAR EN COLUMNAS = 1.238ππ Tarrajeo(exteriores): (7π₯0.02π₯2.2)π₯2 = 0.616π3 (6π₯0.02π₯2.2)π₯2 = 0.528π3 TOTAL DE VOLUMEN A TARRAJEAR EN EXTERIORES = 1.144ππ
Metrado de la losa: (6π₯7π₯0.2) = 8.4π3 (1.4π₯0.6π₯0.2) = 0.168π3 RESTO TOTAL DEL VOLUMEN = 8.232ππ
(6π₯7) = 42π2 TRAGALUZ (1.4π₯0.6) = 0.84π2 RESTO TOTAL DEL AREA = 41.16ππ
(41.16π₯0.05) = 2.058π3 (7/3) = 23.3 = 24 πΈπππ΄πΆπΌππ (0.15π₯0.05π₯24) = 0.18π3 TOTAL DE VOLUMEN DE CONCRETO = 2.238ππ