07:48:09 David McNutt Mercer GSS inc. is pleased to submit for your review and consideration the following proposal. A. Generator – 15 kW Briggs & Stratton Briggs & Stratton 15kW LP/ Gas Outdoor Generator • Built in charger helps maintain battery at optimum level • Automatic generator exerciser • Units operate on either NG or LP vapor • 627cc Vanguard 2 cyl engine B. Automatic Transfer Switch 200amp N3 enclosure Briggs 200 amp Load center automatic switch • • • • •
2 pole 250 VAC contactors 160 millisecond transfer time Double throw, mechanically interlocked contractor mechanism Dual coil design Designed for standby applications
C. Installation Scope GSS Inc. proposes to furnish all materials and perform all labor necessary to complete the following work:
Crawling Stone INC. 715-543-8895
Generator Service Solutions Generators- Sales- Service- Property management
• • • • • •
Deliver generator and set in place ( customer location ) Provide installation support 200 amp transfer switch Run LP gas line to generator and plumb to new generator regulator Install battery and perform start-up procedures Install cold weather package ( Battery warmer, Block heater) Set generator exerciser and instruct customer on operation
Total Lump Sum for Items A through C above:
$5,829.00
Terms and Conditions: Terms are 50% down, net 15 days after start-up; Lead time for generator is 2-4 weeks. Taxes are not included and will be added to the above pricing. Shipping and handling related expenses are included. This proposal remains valid for thirty (30) days. To expedite order processing, please sign and Mail to the address below.