Suggested Answers with Examiner's Feedback

Page 1 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Question Paper Operations Management - II (MB242): October 2007 • •

1.

Answer all questions. Marks are indicated against each question.

Which of the following SCM enablers’ basic objective is to prepare an organization’s processes in such a way that they are able to understand and react to customer requirements fast? (a) (b) (c) (d) (e)

Alignment Customer-supplier focus Design Measurement Participation. (1 mark)

2.

Which of the following is not an advantage derived by firms through the usage of Computer Aided Manufacturing (CAM)? (a) (b) (c) (d) (e)

Reliable information inputs Consistent product quality High labor turnover Improvement in production rate Reduction in labor costs. (1 mark)

3.

Management of materials is very significant in a firm. Which of the following is not one of the objectives of a firm, accomplished through materials management? (a) (b) (c) (d) (e)

Obtain least possible prices for materials purchased Maintain low inventory turnover Ensure continuous availability of materials for production Maintain cordial relations with suppliers Keep searching for new products and materials. (1 mark)

4.

Which of the following types of organizations lay emphasis on preventive maintenance to avoid frequent equipment breakdowns, as the failure of a component of equipment results in the entire production system or major part of it remaining idle? I. II. III. (a) (b) (c) (d) (e)

Product-focused organizations. Process-focused organizations. Highly automated production units. Only (I) above Only (II) above Only (III) above Both (I) and (III) above Both (II) and (III) above. (1 mark)

5.

Improving the SCM system with the help of SCM leadership component requires managers to form different functional domains that interact with the supply chain to constitute the leadership component. These functions include I. Materials. II. Manufacturing operations. III. Manufacturing engineering. IV. Design engineering. (a) (b) (c) (d) (e)

Both (I) and (II) above Both (III) and (IV) above (I), (II) and (III) above (I), (II) and (IV) above All (I), (II), (III) and (IV) above. (1 mark)

Suggested Answers with Examiner's Feedback

6.

Page 2 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

If a firm reduces its costs on materials, the return on investment of the firm increases considerably. ‘Materials’ here refer to (a) (b) (c) (d) (e)

Current assets Fixed assets Total assets Fictitious assets Quick assets. (1 mark)

7.

An MRP system disassembles the end product into component parts and subassemblies, based on the demand for the end product. In which of the following industries are the expected level of benefits low? (a) (b) (c) (d) (e)

Assemble-to-stock Fabricate-to-stock Process Assemble-to-order Manufacturer-to-order. (1 mark)

8.

Irregular preventive maintenance activities, which detect the problems while the equipment is still performing at a satisfactory level is condition-based, including tasks such as I. Repairs. II. Overhauls. III. Cleaning of spills. IV. Cleaning of dust collectors. (a) (b) (c) (d) (e)

Both (I) and (II) above Both (II) and (III) above (I), (II) and (III) above (I), (II) and (IV) above All (I), (II), (III) and (IV) above. (1 mark)

9.

With respect to the purchasing department’s function in an organization, some firms hire external specialists to negotiate purchasing terms and conditions called as (a) (b) (c) (d) (e)

Purchase negotiators Purchase consultants Contract consultants Negotiators Consultants. (1 mark)

10. Global organizations require information about customers, suppliers, competitors, and other macro economic factors, in addition to factors like market size, capability of the subsidiary etc. for (a) (b) (c) (d) (e)

Market selection Product development Resource allocation Technology choice Product promotion. (1 mark)

11. Information required by an MRP system, to operate successfully in translating the demand for end products into raw material and component requirements include(s) I. II. III. (a) (b) (c) (d) (e)

Demand forecasts. Capacity information. Customer orders pending for future deliveries. Only (I) above Only (II) above Both (I) and (III) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

12. Which of the following is/are considered being the potential sources of confusion with regard to network modeling?

Suggested Answers with Examiner's Feedback

I. II. III. (a) (b) (c) (d) (e)

Page 3 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Time estimates. Schedule of activities. Activity variance. Only (I) above Only (II) above Both (I) and (II) above Both (I) and (III) above Both (II) and (III) above. (1 mark)

13. Computing the storage capacity required in the production department and adjusting it to maintain a smooth flow of work, is the task performed by (a) (b) (c) (d) (e)

Purchasing department Receiving department Production department Raw materials inventory department Finished goods inventory department. (1 mark)

14. ERP packages provide one-stop solutions to all business processes requirements. Many extensive ERP systems incorporate business process solution(s) such as I. II. III. (a) (b) (c) (d) (e)

Customer Relationship Management (CRM). Supply Chain Management (SCM). Warehouse Management. Only (II) above Both (I) and (II) above Both (I) and (III) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

15. Which of the following is not a component that makes up a typical Flexible Manufacturing System (FMS)? (a) (b) (c) (d) (e)

An automated loading system An unloading system Robots A central computer that integrates the whole process Two or more machining centers. (1 mark)

16. Calculate the completion time (TE) of the project, from the given information. Activity 1–2 2–3 2–4 3–5 4–5 5–6 (a) (b) (c) (d) (e)

to 4 6 5 2 7 6

tm

tp

6 9 7 4 9 10

8 12 9 6 11 14

26 weeks 32 weeks 34 weeks 29 weeks 30 weeks. (3 marks)

17. Which of the following operational issues is dependent on various factors like level of demand for the products or services the company is planning to provide, the market for which the product is being developed for, the guidelines and regulations of the country that the company is operating in, the infrastructure near the location, and the availability of required manpower? (a)

Capacity

Suggested Answers with Examiner's Feedback

(b) (c) (d) (e)

Page 4 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Technology Facilities Innovation Workforce. (1 mark)

18. Materials receiving report is prepared by the receiving department to process incoming shipments of materials. Which of the following is/are the departments which use the receiving report as the basis for carrying on their activities? I. II. III.

Accounts department. Manufacturing department. Marketing department.

(a) (b) (c) (d) (e)

Only (I) above Only (II) above Only (III) above Both (I) and (II) above Both (I) and (III) above. (1 mark)

19. Which of the following is not an advantage of Project Evaluation and Review Technique (PERT)? (a) (b) (c) (d) (e)

Provides a graphical display of project activities Ideal for tactical and operational level planning Handling of situations in which two or more projects share available resources Provides a ‘what if’ analysis on project activities Effective in planning single project activities in any type of industry. (1 mark)

20. Which of the following statements relating to business process reengineering is false? (a) (b) (c) (d) (e)

Advocates complete overhaul of the existing systems and processes in an organization Increases productivity Reduces costs Provides a general overview of the operations of a business Improves business practices. (1 mark)

21. Consider the following network (duration in weeks):

17

2

12

10

1 25

3

10

5

10

4 3

7 5

6

8

The critical path of this network is (a) (b) (c) (d) (e)

1–2–4–5–7 1–2–3–4–5–7 1–2–4–6–7 1–2–3–4–6–7 1 – 3 – 4 – 5 – 7. (2 marks)

22. The objective of the inventory control function in materials management is to maintain stock of materials in various stages of production, in the desired quantities to minimize the overall cost of production. The inventory control function is represented in (a) (b) (c) (d) (e)

Shipping department Purchasing department Distribution centers and warehouses Production department Receiving department. (1 mark)

23. Firms usually follow the practice of breakdown maintenance for non-critical equipment. Which of the

Suggested Answers with Examiner's Feedback

Page 5 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

following is also referred to as breakdown maintenance? (a) (b) (c) (d) (e)

Preventive maintenance Remedial maintenance Predictive maintenance Civil maintenance Electrical maintenance. (1 mark)

24. A Kanban system uses three types of cards to initiate material transactions. Which of the following is/are the cards that describe the list of materials needed for continuing the production process? I. II. III. (a) (b) (c) (d) (e)

Production authorization card. Vendor authorization card. Conveyance authorization card. Only (I) above Only (II) above Only (III) above Both (I) and (II) above Both (II) and (III) above. (1 mark)

25. Which of the following is calculated using the formula

Goods/services produced (output) Quantity of raw material and components used (input) (a) (b) (c) (d) (e)

Single factor productivity Multifactor productivity Labor productivity Material productivity Total productivity. (1 mark)

26. Which of the following is a diagrammatic representation of different business systems and processes, and their interconnections and interdependencies that defines the activities performed and workflow structure in a broad manner?

(a) (b) (c) (d) (e)

Business model Integrated data model Workload charts Scheduling charts Bills of Material. (1 mark)

27. Which of the following is not concerned with the activity of routing and developing routing sheets?

(a) (b) (c) (d) (e)

Routing sheets specify the skills required by an operator to perform the specific jobs Routing sheets provide information such as the list of operations to be performed by an operator Production requirements are considered while drawing up the routing sheets Routing determines when the work is to be done Layout structure is considered while drawing up routing sheets. (1 mark)

28. In which of the following categories, do robots perform a set of operations according to the instructions given in the program, based on data fed into them through devices like punched tapes, data cards and digital switches?

(a) (b) (c) (d) (e)

Physically operated robots Fixed sequence robots Numerical control robots Playback robots Intelligent robots. (1 mark)

29. Proper production planning based on actual requirements, results in which of the following advantages of Electronic Supply Chain Management?

(a) (b) (c)

Cost saving Reduction in inventory levels Reduction in procurement costs

Suggested Answers with Examiner's Feedback

(d) (e)

Page 6 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Reduction in stock-out costs Reduced involvement of purchasing department. (1 mark)

30. Which of the following is/are the measure(s) adopted by service firms in measuring productivity?

I. II. III. (a) (b) (c) (d) (e)

Number of customers served in a given time period. Maintenance of time sheets by service professionals. A comparison of the service provided with past achieved results. Only (I) above Both (I) and (II) above Both (I) and (III) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

31. From the information given below, identify the activity that needs to be crashed first, if the critical path of the project is 1 – 2 – 3 – 4 – 5 – 6. Activity 1–2 1–3 2–3 2–6 3–4 4–5 4–6 5–6

(a) (b) (c) (d) (e)

Normal Time 2 3 5 6 3 3 2 5

Crash Time 1 1 4 4 2 1 2 3

Normal Cost 1500 1200 1200 1400 1000 1000 1100 1800

Crash Cost 1800 1600 1300 1800 1100 1300 1500 1900

(1 – 2) (2 – 3) (3 – 4) (4 – 5) (5 – 6). (2 marks)

32. Which of the following statements is false relating to partial productivity?

(a) (b) (c) (d) (e)

It is also termed as single factor productivity It is also termed as multifactor productivity It includes all the factors of production It is referred as labor productivity index It includes a single factor or a combination of factors. (1 mark)

33. Which of the following systems used to integrate the entire supply chain, gives rise to a truly virtual corporation that facilitates real time information flow between various supply chain partners?

(a) (b) (c) (d) (e)

Supply Chain Management Electronic Supply Chain Management Business Process Reengineering Customer Requirement Planning Enterprise Resource Planning. (1 mark)

34. Inputs, processing and outputs are the three elements common to all available variants of MRP system. The MRP system inputs include

I. Master production schedule. II. Bills of material. III. Inventory records file. IV. Work Breakdown Structure. (a) (b) (c) (d) (e)

Only (I) above Both (I) and (II) above Both (II) and (IV) above (I), (II) and (III) above (I), (II) and (IV) above.

Suggested Answers with Examiner's Feedback

Page 7 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only. (1 mark)

35. Total Quality Management (TQM) is a philosophy that seeks organization-wide improvement through the involvement of every individual in the organization. Which of the following is not one of the various tools and techniques used to give shape to TQM philosophy?

(a) (b) (c) (d) (e)

Kaizen Kanban Quality circles Quality Improvement Teams Total Productivity Management. (1 mark)

36. Firms that practice JIT production systems maintain long-term business relationships with a few selected suppliers. In this process, firms may also invite suppliers’ representatives to participate and suggest

I. II. III. (a) (b) (c) (d) (e)

Design review. New designs. Methods for improving productivity. Only (I) above Only (II) above Both (I) and (II) above Both (I) and (III) above All (I), (II) and (III) above. (1 mark)

37. Drawing up operations schedule requires the operations managers to understand the type of operation. The type of operations that use the Gantt charts for scheduling are

(a) (b) (c) (d) (e)

Job operations Continuous operations Labor-intensive operations Service operations Fabricating operations. (1 mark)

38. Facilities management involves managing all the facilities that come under the purview of an organization to enable the organization to function more efficiently. Facilities management encompasses which of the following managerial functions?

(a) (b) (c) (d) (e)

Human resources management Financial management Management of information technology Maintenance management Customer relationship management. (1 mark)

39. Which of the following statements is false regarding offsetting, a step in the MRP information processing system?

(a) (b) (c) (d) (e)

It uses information obtained from explosion process It is used to determine the planned order releases It is used to determine the change in due dates It helps in determining the gross product requirement for items at the next lower level in the product structure chart It uses the information obtained from netting process. (1 mark)

40. Which of the following statements is false regarding the ‘bathtub curve’ used for assisting in decisions regarding maintenance requirements?

(a) (b) (c) (d) (e)

Illustrates the different stages of a piece of equipment Illustrates the probability of failure during a particular stage It can be used to study the failure rates characteristic of new equipment It is always considered to be the most effective indicator of the failure rates of equipment It can be used to study the failure rates characteristic of old equipment. (1 mark)

41. Which of the following is the dispatching rule used in scheduling the production activities of a firm that

Suggested Answers with Examiner's Feedback

Page 8 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

does not prioritize the jobs according to their relative importance because all jobs are treated as equally important?

(a) (b) (c) (d) (e)

Earliest due date Longest processing time Shortest processing time First in, first serve Slack time remaining. (1 mark)

42. Which of the following is/are the condition(s) for crashing a selected activity to the maximum possible extent?

I. The activity is at its minimum possible value. II. The time reduced is equal to the smallest slack value of the non-critical activities. III. The reduced time is equal to the desired project completion time. IV. The time reduced is equal to the smallest slack value of the critical activities. (a) (b) (c) (d) (e)

Both (I) and (II) above Both (I) and (III) above Both (II) and (III) above (I), (II) and (III) above (I), (II) and (IV) above. (1 mark)

43. In which of the following stages of a typical ERP implementation program are performance standards set for each process, by using benchmarking techniques?

(a) (b) (c) (d) (e)

Identify the needs for the ERP package Evaluating the “as-is” situation of the business Decisions about the desired “would-be” situation for the business Reengineering of business processes to achieve the desired results Evaluation of available ERP packages. (1 mark)

44. Which of the following range of activities that form a part of the facilities management department encompass the activities of planning and designing of physical facilities?

(a) (b) (c) (d) (e)

Facilities planning and forecasting Architectural planning and design Workplace planning, allocation and management Operations, maintenance and repair Alteration, renovation and workplace installation. (1 mark)

45. The documents which empower the purchase department to procure a specific quantity of inventory items required within a specified period are

(a) (b) (c) (d) (e)

Planned orders Order releases Planning reports Performance reports Exception reports. (1 mark)

46. Manufacturing line workers and staff supervisors carry out operations control functions involving various activities. Which of the following is not one of those activities?

(a) (b) (c) (d) (e)

Purchasing parts and components Executing work orders Monitoring material movements Reviewing the purchasing activities Checking worker performance. (1 mark)

47. Which of the following dimensions of quality describes the probability of a product malfunctioning within a given period?

(a) (b)

Performance Features

Suggested Answers with Examiner's Feedback

(c) (d) (e)

Page 9 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Reliability Perceived quality Conformance. (1 mark)

48. A combination of complementary skills and knowledge bases embedded in a group or team that result in the ability to execute one or more critical processes to a world-class standard is defined as

(a) (b) (c) (d) (e)

Comparative advantage Core competence Proprietary technology Process efficiency Operations strategy. (1 mark)

49. Implementing an MRP system involves high costs and technical complexities. In addition to this, organizations need to spend considerable effort on various issues, which do not include costs involving

(a) (b) (c) (d) (e)

Maintaining the software Validating Recruiting Testing Eliminating possible errors. (1 mark)

50. Which of the following is not a function of facilities managers?

(a) (b) (c) (d) (e)

Recruiting and hiring people Conducting and participating in planning activities Guiding the middle management in improving the work atmosphere Acting as change agents Developing and maintaining a controlling center. (1 mark)

51. Major developments in microelectronics and computer technology have led to significant advances in robotics. Which of the following are the tasks that one-armed robots are capable of doing?

I. Lifting. II. Welding. III. Assembling parts. IV. Spray painting. (a) (b) (c) (d) (e)

Both (I) and (II) above Both (I) and (IV) above (I), (II) and (III) above (I), (II) and (IV) above All (I), (II), (III) and (IV) above. (1 mark)

52. The materials requirement planning system, like any other management information system, can be expanded to support other functions. Which of the following is not a function that is supported by an MRP system?

(a) (b) (c) (d) (e)

Engineering Production Recruiting Purchasing Finance. (1 mark)

53. Production process involves a series of activities, formulated after detailed technical and engineering analysis of all the components of a particular product, and development of a prototype of the product. Prototype testing helps organizations in identifying

I. II. III. (a) (b)

Shortcomings. Defects. Faults in the products. Only (II) above Only (III) above

Suggested Answers with Examiner's Feedback

(c) (d) (e)

Page 10 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Both (I) and (II) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

54. From the product structure tree given below, calculate the number of units of F required to manufacture 240 units of A. The on-hand inventory available is 120 units of subassembly B and 80 units of subassembly C.

A

B(2)

C(3)

D(1)

H(2)

G(2)

E(2)

F(2)

(a) (b) (c) (d) (e)

I(1)

F(3)

2,640 units 1,890 units 2,280 units 2,860 units 1,920 units. (2 marks)

55. Which of the following are considered the key drivers of supply chain management that help determine not only the responsiveness and effectiveness, but also the strategic fit of the supply chain?

I. Inventory. II. Transportation. III. Facilities. IV. Information. (a) (b) (c) (d) (e)

Both (I) and (II) above Both (II) and (III) above (I), (II) and (III) above (I), (II) and (IV) above All (I), (II), (III) and (IV) above. (1 mark)

56. Following are the means ( X ) and range (R) of ten samples each of size 10.

Sample

1

2

3

4

5

6

7

8

9

10

X

52

46

39

45

41

50

38

43

55

49

R

8

6

4

5

4

7

4

5

9

6

(Conversion factors for sample size 10 are given as A2 = 0.308, D3 = 0.223, D4 = 1.777) The CL for the R-chart is (a) (b) (c) (d) (e)

5.80 1.29 10.31 7.09 16.11. (1 mark)

57. A firm engaged in manufacturing bulbs of three models P, Q and R carries out three functions: setup work, fabrication and assembling. From the table given below, calculate the number of employees required for carrying out the setup work, fabrication and assembling functions respectively. Product

Volume

Production Rate (units per hour) Setup work Fabrication Assembling

Suggested Answers with Examiner's Feedback

P Q R

120 180 240

3.75 2.5 3

Page 11 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only. 2 3 2.5

2.5 3.75 5

(Assuming each employee works for 8 hours a day). (a) (b) (c) (d) (e)

25, 23, 27 23, 27, 18 18, 25, 20 23, 25, 18 27, 23, 18. (3 marks)

58. Which of the following is/are the basic type(s) of robot applications?

I. II. III. (a) (b) (c) (d) (e)

Processing. Manipulation. Pick-and-place. Only (III) above Both (I) and (II) above Both (I) and (III) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

59. Which of the following is one of the seven SCM components that provides the SCM system direction, designs and assists in deployment and improvement of the SCM system?

(a) (b) (c) (d) (e)

SCM strategy SCM leadership Operational planning Order-to-delivery process Business relationship management. (1 mark)

60. Which of the following involves capturing data regarding the flow of items through automatic means such as bar coding, and using this information in planning and scheduling production activities?

(a) (b) (c) (d) (e)

CAD Direct CAM Indirect CAM FMS CIM. (1 mark)

61. In the ABC classification system of materials management technique, the materials are classified based on

(a) (b) (c) (d) (e)

Type of material Quantity used Cost per unit Usage value Availability of materials. (1 mark)

62. Productivity, one of the major concerns of managers in organizations, is believed to be affected by several factors. Which of the following is/are the factor(s)?

I. II. III. (a) (b) (c) (d) (e)

Bottlenecks in the production process. Training programs. Total production cycle time. Only (I) above Only (II) above Both (I) and (II) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

Suggested Answers with Examiner's Feedback

Page 12 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

63. A computerized system that helps the customers and suppliers or departments within the same organization to share and transmit information electronically in real time using standardized forms of electronic documents is known as

(a) (b) (c) (d) (e)

Electronic Data Interchange Computer Integrated Manufacturing Computer Aided Manufacturing Flexible Manufacturing Systems Artificial Intelligence. (1 mark)

64. Which of the following statements is false with respect to total quality control in JIT firms?

(a) (b) (c) (d) (e)

They use a concept known as “immediate customer” Only items of acceptable quality are delivered to the immediate customer JIT firms maintain separate departments for correcting defects In JIT manufacturing systems, each worker is trained in quality principles and testing procedures JIT firms conduct surveys to produce high-quality products. (1 mark)

65. The impediment which emphasizes that an organization’s globalized activities may become uneconomical due to the need for customization of products and services is

(a) (b) (c) (d) (e)

Economic impediment Managerial impediment Cultural impediment Technical impediment Institutional impediment. (1 mark)

66. Inputs for measuring the productivity can also be viewed in terms of costs associated, in addition to various other categories. Which of the following is not one of those categories of costs?

(a) (b) (c) (d) (e)

Material costs Transportation costs After sales costs Direct costs Overheads. (1 mark)

67. Which of the following statements is false about scheduling?

(a) (b) (c) (d) (e)

Maximizes customer satisfaction Minimizes service delays Provides firms a competitive advantage Scheduling high capacity results in incomplete jobs Proper scheduling can increase the profitability of firms. (1 mark)

68. The probabilities of failure after maintenance for a machine in the spindles section of a machine tools firm are given in the following table:

Quarters after maintenance Probabilities of break-down

1 0.1

2 0.2

3 0.3

4 0.1

5 0.3

If there are 22 identical machines in the plant, the average cost of preventive maintenance is Rs.750 and the cost of remedial maintenance per machine is Rs.4,200, then calculate the expected number of breakdowns in the 4th quarter and the average total cost of maintenance per month. (a) (b) (c) (d) (e)

14.32, Rs.23,928 18.86, Rs. 5,982 14.32, Rs. 5,982 18.32, Rs.23,928 18.86, Rs. 5,928. (3 marks)

69. Which of the following is not a principle of supply chain management?

(a)

Segment customers based on service needs

Suggested Answers with Examiner's Feedback

(b) (c) (d) (e)

Page 13 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Customize the logistics network Plan based on market demand Reducing employee turnover Devise a complete supply chain performance measure. (1 mark)

70. Which of the following is a Japanese practice that suggests discontinuing the production process because of existence of a problem?

(a) (b) (c) (d) (e)

Andon Poka-yoke Jikoda Just In Time Total Quality Management. (1 mark)

71. Mr. Mohan, the operations manager of BIL Ltd. is in the process of scheduling the work times of the employees. If he gives the employees an option to select their work hours from a list of available shifts, this approach is called as

(a) (b) (c) (d) (e)

Flextour Flextime Staggered times Compressed workweek Part time. (1 mark)

72. Organizations, both large and small, and suppliers as well benefit from JIT systems. Which of the following is not a benefit that suppliers accrue from using JIT systems?

(a) (b) (c) (d) (e)

A long-term guaranteed contract for supply of materials A steady and continuous demand for their materials Less expenditure on promotional activities Improvement in the quality of product or service Timely payment for materials supplied. (1 mark)

73. Ajay Electricals Ltd. has five different jobs in process with delivery requirements as shown below. Today is Day 51, and the company uses the critical-ratio scheduling technique. Rank the jobs according to priority.

Planned days Work remaining in days

(a) (b) (c) (d) (e)

A 58 9

B 61 15

C 65 13

D 70 18

E 67 16

B, A, E, D, C B, A, D, E, C B, A, C, D, E D, E, A, B, C A, B, D, E, C. (2 marks)

74. Quantitative performance, also called productivity, is the output produced using a given set of inputs. Productivity provides a good measure of performance at which of the following level(s)?

I. II. III. (a) (b) (c) (d) (e)

National. Industry. Individual business level. Only (I) above Only (II) above Both (I) and (II) above Both (II) and (III) above All (I), (II) and (III) above. (1 mark)

75. Which of the following statements is/are refer to the Activity-On-Arrow convention for representing a

Suggested Answers with Examiner's Feedback

Page 14 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

project in a network? I.

Activities are represented by circles with arrows linking them together to show the order of their performance. II. Activities are represented by arrows. III. Events are used to connect predecessor and successor activities. IV. The activities are identified with a number or name. (a) (b) (c) (d) (e)

Both (II) and (III) above Both (II) and (IV) above (I), (II) and (III) above (II), (III) and (IV) above All (I), (II), (III) and (IV) above. (1 mark)

76. Forward and backward scheduling are the two methods used for the scheduling of operations. Which of the following statements is true about backward scheduling?

(a) (b) (c) (d) (e)

It is used in fabrication operations The work-in-process inventory is high in this method Orders are scheduled according to their due dates Jobs are completed before they are required at the subsequent work centers Orders are scheduled starting from the date of production. (1 mark)

77. Following JIT production systems enables firms to minimize the movement of materials by placing the equipment in cells. A cell is defined as

(a) (b) (c) (d) (e)

Grouping of several types of machines in which each machine performs a single operation repeatedly Grouping of several types of machines in which each machine performs an operation only once Grouping of several types of machines in which several machines perform a single operation repeatedly Grouping of several types of machines in which each machine performs a number of similar operations repeatedly Grouping of several types of machines in which several machines perform a series of similar operations repeatedly. (1 mark)

78. The small parts division of a manufacturing organization dealing in heavy machinery received 5 job orders – A, B, C, D and E to prepare screws of varying sizes, for 2 different machines.

From the following information, develop the order in which jobs are to be processed using the dispatching rule – slack time remaining and also calculate the average delay of a job. Job (In order of arrival) Processing Times (days) Due date (Days hence) A 4 7 B 6 8 C 3 5 D 5 6 E 2 4 (a) (b) (c) (d) (e)

D – E – C – B – A, 5.8 days D – C – B – E – A, 6.2 days D – B – C – E – A, 3.5 days E – C – D – B – A, 4.6 days E – B – D – C – A, 7.0 days. (3 marks)

79. Which of the following forces shaping the supply chain focuses on finding a balance between cost and quality, and customization and availability without compromising on any one of them?

(a) (b) (c) (d) (e)

Consumer demand Globalization Competition Information and communication Environment.

Suggested Answers with Examiner's Feedback

Page 15 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only. (1 mark)

80. JIT, in spite of being a powerful tool for reducing the firm’s inventory and improving productivity, the implementation of JIT principles is difficult due to certain barriers. Which of the following is not one of those barriers?

(a) (b) (c) (d) (e)

Difficulty in accomplishing zero lead-time Zero safety stock Zero stock-out costs Zero idle time Worker’s resistance to change. (1 mark)

81. Which of the following is/are the procedure(s) adopted by firms that enable them in the conversion of internal setup activities into external setup activities?

I. Heating. II. Cleaning. III. Streamline work. IV. Fabricating. (a) (b) (c) (d) (e)

Only (III) above Both (I) and (II) above Both (II) and (IV) above (I), (II) and (III) above (I), (II) and (IV) above. (1 mark)

82. The machine tools division of HMT Ltd. has two job orders, A to produce 600 nuts of 2mm and B to produce equal number (600) of bolts. Both these orders have to be processed on two machines M1 and M2. The route sheets for the jobs, which should be ready in the next 8 hours with the machines starting processing from now, are given below. Job X Route sheet Job Y Route sheet Routing Processing Routing Processing Machine Machine sequence time (Hours) sequence time (Hours) 1 M1 2 1 M2 2 2 M2 1 2 M1 2 3 M1 3 3 M2 1 Total 6 Total 5 The latest time to start the two jobs as to finish them by the end of 8 hours using backward scheduling is

(a) (b) (c) (d) (e)

2nd hour for Job X, 5th hour for Job Y 2nd hour for both Job X and Job Y 7th hour for Job X, 5th hour for Job Y 3rd hour for Job X, 5th hour for Job Y 7th hour for Job X, 4th hour for Job Y. (2 marks)

83 Which of the following quality dimensions is influenced by individual preferences and is used to cater to a niche market?

(a) (b) (c) (d) (e)

Performance Serviceability Aesthetics Perceived quality Features. (1 mark)

84. Which of the following services come under the scope of facilities management?

I. Waste management. II. Water treatment and management. III. Asset protection services. IV. Health facilities management.

Suggested Answers with Examiner's Feedback

(a) (b) (c) (d) (e)

Page 16 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Both (I) and (II) above Both (I) and (III) above Both (III) and (IV) above (I), (II) and (III) above All (I), (II), (III) and (IV) above. (1 mark)

85. Given below is the data relating to number of defectives in each sample in the production process of a manufacturing firm. Calculate the control limits (UCL, LCL and CL) if the size of sample is given as 25.

Sample Number defectives (a) (b) (c) (d) (e)

of

1

2

3

4

5

6

7

8

9

10

2

3

2

1

1

3

1

4

1

2

0.2879, 0.0827 and 0.19 respectively 0.2429, 0 and 0.08 respectively 0.2429, 0.0827 and 0.16 respectively 0.2429, 0 and 0.16 respectively 0.2879, 0 and 0.19 respectively. (2 marks)

86. Globalization can be defined as the removal of trade barriers between an economy and other economies. Which of the following is not one of those barriers?

(a) (b) (c) (d) (e)

Goods or services Capital Currency Knowledge Information. (1 mark)

Suggested Answers with Examiner's Feedback

Page 17 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Suggested Answers Operations Management - II (MB242): October 2007 1.

2.

3.

Answer : (b) Reason : The basic objective of customer-supplier focus is to prepare an organization’s processes in such a w that they are able to understand and react to customer requirements fast. Answer : (c) Reason : Benefits of using CAM: •

Reliable information inputs



Consistent product quality



Reduction in labor costs



Better control and management of equipment and materials

• Improvement in production rate. High labor turnover is not an advantage of CAM. Answer : (b) Reason : Materials management helps accomplish the following objectives of a firm:

4.

Answer : Reason :

5.

Answer : Reason :

6.

Answer : Reason :

7.

Answer : Reason :

8.

Answer : Reason :

9.

Answer : Reason :

10.

Answer :



Obtain the least possible prices for materials purchased.



Maintain high inventory turnover so that less capital is tied up in inventory, i.e. help increase t effective utilization of the firm’s capital.



Ensure the availability of materials required to continue production, when there are disruptions supply.



Maintain cordial relations with suppliers and supplying firms.



Maintain records along with well-planned administrative controls and periodic audits that discoura corruption.

• Keep searching for the new products and materials that can help the firm run efficiently. From the above points, we can infer that maintaining high inventory turnover is an objective of materi management, but not maintaining low inventory turnover. (d) Product-focused organizations and highly automated production units emphasize preventive maintenan to avoid frequent equipment breakdowns, as the failure of a component of equipment results in the ent production system or major part of it remaining idle. On the other hand, process-focused organizations l greater emphasis on efficient remedial maintenance. (e) SCM leadership component provides SCM system direction, designs and assists in deployment a improvement of the SCM system. Managers form different functional domains that interact with t supply chain to constitute the leadership component. These functions include materials, purchasin quality, manufacturing operations, manufacturing engineering, design engineering and marketing. (a) Current assets are the materials, the reduction in the cost of which increases the return on investment the firm considerably. (b) MRP is useful for organizations involved in the production of complex products, organizations worki with shorter delivery schedules, job-shops and assemble-to-order organizations. The expected level of benefits are low for the fabricate-to-stock and fabricate-to-order industries. From the above information, option (b) is correct. (c) Irregular preventive maintenance includes tasks like repairs, overhauls, and cleaning of spills. The set irregular preventive maintenance activities, which detects problems while the equipment is s performing at a satisfactory level, is referred to as predictive maintenance. Preventive maintenance time-based whereas predictive maintenance is condition-based. (c) Some firms hire external specialists, called contract consultants to negotiate purchasing terms and conditions. (a)

Suggested Answers with Examiner's Feedback

Page 18 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Reason :

11.

12.

13.

14.

15.

16.

Market selection for global organizations requires considerable attention to factors like market size, t capability of the subsidiary, the value of experience that can be gained there and so on. Information abo customers, suppliers, competitors, and other macro economic factors is also necessary for mark selection. Answer : (e) Reason : An MRP system requires the following information to operate successfully: •

Customer orders pending for future deliveries and unfinished orders that must be completed in t planned production period



Demand forecasts that specify the quantity of products demanded and the time period in which the demands are to be satisfied



Capacity information that helps in anticipating and correcting resource shortages



Details of the dependent demand inventory items at the various stages of the transformation process



Changes in inventory requirements due to product design changes expected during the planning tim period



Available level of inventories at the beginning of the planning time period



Quantities of ordered, purchased, or contracted inventory items that an organization expects to recei during the planning time period.

Answer : (d) Reason : Network scheduling is a effective yet a complex tool for managers to understand and apply. The tim estimates and activity variance are some of the potential sources of confusion in network modeling. Answer : (c) Reason : Computing the storage capacity required in the production department and adjusting it to maintain smooth flow of work, is the task performed by the production department. Answer : (e) Reason : ERP packages, now provide one-stop solutions to all business processes requirements. Nowadays many extensive ERP systems incorporate Customer Relationship Management (CRM), Supply Chain Management (SCM), warehouse management and other business process solutions. Answer : (c) Reason : The components that make up a typical FMS are: •

An automated loading system to load materials



Two or more machining centers, which are automated to change tools by themselves



A system to move materials in between machining centers



An unloading system

• A central computer that integrates the whole process. Robots do not form a component of the FMS. Answer : (b) Reason : The network diagram for the given information is as follows:

Activity 1–2 2–3 2–4 3–5 4–5 5–6

to 4 6 5 2 7 6

tm 6 9 7 4 9 10

tp 8 12 9 6 11 14

t o + 4t m + t p Where te is calculated using the formula, te =

6

te 6 9 7 4 9 10

Suggested Answers with Examiner's Feedback

Page 19 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

The critical path of the given network is 1 – 2 – 4 – 5 – 6. Completion time (TE) = Sum of all the expected mean times (te) on the critical path. ∴ TE for the above project = 6 + 7 + 9 + 10 = 32 weeks. 17.

18.

19.

20.

21.

22.

Answer : (c) Reason : Facility decisions are taken after checking the suitability of a location. The suitability of a location dependent on the various factors: level of demand for the products or services the company is planning provide, the markets for which the product is being developed for, the guidelines and regulations of t country that the company is operating in, the infrastructure near the location, and the availability required manpower. Answer : (d) Reason : On the basis of the receiving report prepared by the receiving department, the warehousing department arranges store space, the manufacturing department schedules production processes; and the accounts department makes payments to vendors. Answer : (c) Reason : PERT method of project planning cannot effectively handle situations in which two or more proje share available resources. Hence, this is not an advantage of PERT. All the other statements are advantages of PERT. Answer : (d) Reason : Business Process Reengineering (BPR) advocates the complete overhaul of the existing systems a processes in an organization in order to increase productivity, reduce costs and improve busine practices. Providing a general overview of the business without going into the technical details of the proces and systems is an objective of business modeling. Answer : (b) Reason : Path Duration 1–2 –4–5–7 17 + 12 + 10 + 10 = 49 weeks 17 + 12 + 5 + 8 = 42 weeks 1–2 –4–6–7 1–3 –4–5–7 25 + 3 + 10 + 10 = 48 weeks 1–3 –4–6–7 25 + 3 + 5 + 8 = 41 weeks 1–2–3–4–5–7 17 + 10 + 3 + 10 + 10 = 50 weeks 17 + 10 + 3 + 5 + 8 = 43 weeks 1–2–3–4–6–7 Critical path has the maximum time estimate. So, 1 – 2 – 3 – 4 – 5 – 7 is the critical path. Answer : (d) Reason : The inventory control function is represented in three departments:

23.

Answer : Reason :

24.

Answer : Reason :

25.

Answer :



Raw materials inventory department



Production department and

• Finished goods inventory department. (b) Remedial maintenance is carried out when a machine or equipment breaks down or is malfunctionin Remedial maintenance is also referred to as ‘breakdown maintenance’ or ‘ ‘corrective maintenance’. (a) The production authorization card authorizes the production department to start the production proce and describes the product’s name, identification number and description and the list of materials need for continuing the production process. (b) Goods and/or services produced (output)

Reason :

26.

Multifactor productivity = Quantity of raw material and components used (input)

Multifactor productivity uses a combination of factors. It takes into consideration more than one fac of production such as labor and materials. Answer : (a) Reason : A business model is a diagrammatic representation of different business systems and processes, and th interconnections and interdependencies. The purpose of business modeling is to provide a gene overview of the operations of a business without going into the technical details of the processes a systems.

Suggested Answers with Examiner's Feedback

27.

28.

29.

30.

31.

Page 20 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Answer : (d) Reason : The sequence of operations and processes to be followed in order to produce a particular product explained through routing. It determines what work is to be done, where and how it is to be done, bu does not determine when the work is to be done. The routing sheets, in addition to providing detailed information about the sequence in which a produ is manufactured, may also provide information such as the list of operations to be performed by operator and the skills required to perform these jobs. The production requirements of a product and t layout structure are the important considerations for drawing up routing sheets. Answer : (c) Reason : Numerical control robots (NC robots) perform a set of operations based on numerical data that is fed in them through devices like punched tapes, data cards and digital switches. Answer : (d) Reason : ESCM ensures that the organizations get timely and accurate forecasts with regard to product or service demand. This allows proper production planning based on actual requirements, resulting in reduced cyc time for production activities and reduction in stock-out costs. Answer : (b) Reason : Measuring productivity in a service organization is based on the number of tasks performed, or t number of customers served in a given time period. Other measures include a comparison of the service provided with established company, industry, customer quality standards. In cases where the task is routine and involves minimal customization, t quantity of work, as for example, the number of service calls made per day, the number of quer handled, or the number of customers served, is used as a measure. In order to measure productivity, service professionals maintain time-sheets to indicate the amount time spent on a given task. The service provided is compared with the established company, industry, or customer quality standar but not with the past (previously) achieved results. Answer : (e) Crash cost - Normal cost

Reason :

Time-Cost Slope = Normal time - Crash time Activity

Normal Time

Crash Time

Normal Cost

Crash Cost

1–2

2

1

1500

1800

1–3

3

1

1200

1600

Time-Cost Slope 300 = 300 1 400

= 200

2

2–3

5

4

1200

1300

100

= 100

1

2–6

6

4

1400

1800

400

= 200

2

3–4

3

2

1000

1100

100

= 100

1

4–5

3

1

1000

1300

300

= 150

2

4–6

2

2

1100

1500

400

= ∝

0

5–6

5

3

1800

1900

100

= 50

2

32.

The critical path activity with the smallest time-cost ratio is selected and crashed first. ∴ From the above calculations, we can infer that activity (5 – 6) has the smallest time-cost slope, a needs to be crashed first. Answer : (c) Reason : Productivity can be measured in relation to a single factor (single factor productivity), a combination

Suggested Answers with Examiner's Feedback

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43

Page 21 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

factors (multifactor productivity), or all the factors taken together (total productivity). Single factor productivity a multifactor productivity can also be termed as partial productivity as all the factors of production a not considered while calculating productivity. The partial productivity ratio is also referred to as the labor productivity index or output per work-ho ratio. Hence, from the above points, we can infer that option (c) is the answer. Answer : (b) Reason : Electronic Supply Chain Management (ESCM) system makes use of Internet technologies to integrate t entire supply chain, from the raw materials supplier to the end-user of the product. Therefore, it results a truly virtual corporation that allows contact with any customer or supplier at any time, by facilitati real time information flow between various supply chain partners. Hence, from above discussion, we can infer that option (b) is correct. Answer : (d) Reason : Inputs of an MRP system include master production schedule, bills of material, and inventory records file. Answer : (b) Reason : Kanban is one of the most widely used materials management methods. In order to use a Kanban system firms should necessarily store their materials and other inventory items in a single-use container like tra or boxes. A card (also called Kanban) is attached to each container mainly to initiate transactions, as it defines the requirement of inventory items to continue the production process. Hence, from the above, we can infer that Kanban is not a tool used for team building and employ empowerment, but is used for managing materials. Answer : (e) Reason : Firms that practice JIT production systems require reliable suppliers who can supply high-qual components and materials in the required quantities. Therefore, JIT firms maintain long-term busine relationships with a few selected suppliers. Firms may also invite their suppliers’ representatives participate in design review, to suggest new designs, and methods for improving product quality productivity. Answer : (a) Reason : The operations manager may use methods like Gantt charts, job sequencing methods and critical ratio t schedule the job operations. Answer : (d) Reason : Facilities management encompasses maintenance management and is one of the functions that a undertaken by a facilities manager. Answer : (c) Reason : The MRP system in the process of offsetting, uses the information obtained from explosion and netti process to determine planned order releases. The planned order releases for the finished product component becomes the gross product requirement for items at the next lower level in the produ structure chart. Answer : (d) Reason : The bathtub curve illustrates the different stages of a piece of equipment and the probability of failu during a particular stage. It can be used not only to study the failure rates characteristic of new equipme but can also be applied for old equipment. The bathtub curve may not always be an effective indicator of the failure rates of equipment. Answer : (d) Reason : Firms that use the rule of First in, first serve, process their jobs in the order of their arrival. In firms th use this rule, jobs are not prioritized according to their relative importance because all jobs are treated equally important. Answer : (d) Reason : The selected activity is crashed to the maximum possible extent until one of the conditions given below satisfied. I. The activity time is at its minimum possible value. II. The time reduced is equal to the smallest slack value of the non-critical activities. III. The reduced time is equal to the desired project completion time. Hence, option (d) is correct. Answer : (c) Reason : Once the structure of the current processes is identified, the next stage involves the identification

Suggested Answers with Examiner's Feedback

44.

45.

46.

47.

48.

49.

50.

51.

Page 22 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

desired attributes for each of the processes. Performance standards are set for each process by using benchmarki techniques. Answer : (b) Reason : Architectural/Engineering planning and design, an important function in facilities manageme encompasses activities of planning and designing of physical facilities (building, manufacturing plan showrooms, outlets etc.). Answer : (b) Reason : Order releases are the documents that empower the purchase department to procure a specific quantity inventory items required within a specified period. Answer : (d) Reason : The activities of the operations control function includes reviewing the distribution activities, but n reviewing the purchasing activities. Answer : (c) Reason : Reliability is the dimension of quality that describes the probability of a product malfunctioning within given period. Answer : (b) Reason : Kevin P Coyne, Stephen J D Hall and Patricia Gorman Clifford defined core competence in T McKinsey Quarterly (1997), as a combination of complementary skills and knowledge bases embedded a group or team that result in the ability to execute one or more critical processes to a world-cla standard. Answer : (c) Reason : In addition to the high costs and technical complexities in the implementation of an MRP syste organizations need to spend a considerable effort on installing necessary equipment (computers), traini personnel, modifying the software to serve their specific needs, validating, testing, and eliminati possible errors, and maintaining the software. It does not include the cost of recruiting the personnel. Answer : (c) Reason : The functions of facilities managers include guiding the employees and top management in developi innovative ways of improving the work atmosphere in the facilities, but not guiding the midd management. Answer : (e) Reason : Major developments in microelectronics and computer technology have led to significant advances robotics. For example, in the automobile industry, the introduction of computer-controlled one-arm robotic devices has helped in the automation of the assembly line, with the one-armed robots bei capable of doing several tasks such as

52.

Answer : Reason :

53.

Answer : Reason :

54.

Answer : Reason :

Lifting. • • Welding. • Assembling parts. • Spray painting. (c) The materials requirement planning system, like any other management information system, can expanded to support other functions like engineering, production, finance, marketing and purchasin Recruiting is not a function of MRP system. (e) The production process involves a series of activities, which is formulated after detailed technical a engineering analysis. Engineering drawings are initially drawn for each component of the product. The individual components are then tested to see if they are technically compatible with other components the product. Once all the components of a particular product are identified, a prototype of the product made to test the performance of the product. Through prototype testing, organizations identify shortcomings, defects and faults in the products. (a) For every unit of A, 2 units of B and 3 units of C are required. Quantity of A to be produced = 240 units ∴Quantity of B required to produce 240 units of A = 480 units Available inventory of B = 120 units Quantity of B to be produced = Quantity required – Available inventory = 360 units 2 units of F are required to produce one unit of B. Hence, 720 units of F are required to produce 360 un

Suggested Answers with Examiner's Feedback

Page 23 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

of B. ∴Quantity of C required to produce 240 units of A = 720 units Available inventory of C = 80 units Quantity of C to be produced = Quantity required – Available inventory = 640 units 3 units of F are required to produce one unit of C. Hence, 1,920 units of F are required to produce 6 units of C. ∴Total quantity of F required to produce 240 units of A = 720 + 1920 = 2,640 units. 55.

56.

Answer : (e) Reason : Supply chain management has become one of the key areas that organizations are focusing on to redu costs and improve the efficiency of the production process. Four key drivers of supply chain performan are inventory, transportation, facilities and information. They help not only the responsiveness a effectiveness, but also the strategic fit of the supply chain. Answer : (a) Reason : Control limits for R-chart is given by the formula: CL = R 8+6+4+5+4+7+4+5+9+6

∴For the given information, R =

= 5.8

10

∴ CL =5.8 57.

Answer : (b) Reason : Based on the information given, the time required for completing each function of all models of bulbs calculated as follows: Product Processing Times Total Time Setup work Fabrication Assembling P 32 60 48 140 Q 72 60 48 180 R 80 96 48 224 Total 184 216 144 544 Volume

The processing times for each function are calculated using the formula - Production Rate The number of employees required can be obtained by dividing the total number of hours with 8, as t number of hours an employee works per day is assumed to be 8 hours. 184

∴ Number of employees required for setup work = 8 = 23 216

Number of employees required for fabricating work =

8

= 27

144

Number of employees required for fabricating work = 8 = 18. 58.

59.

Answer : (c) Reason : The two basic types of robot applications are ‘processing’ and ‘pick-and-place’. In a processi application, the robot works as a tool by performing a job on the product (cutting, screwing etc.) th moves to the robot. In a pick-and-place application, the robot moves the product (e.g. loading a unloading of materials). Answer : (b) Reason :

The seven SCM components are: •

SCM leadership



SCM strategy



Operational planning



Business relationship management



Order-to-delivery process

Suggested Answers with Examiner's Feedback

60.

61.

62.

63.

64.

65.

66.

67.

68.

Page 24 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.



Quality and performance management



Human resources management.

SCM leadership provides SCM system direction, designs and assists in deployment and improvement of the SCM system. Answer : (c) Reason : The use of computers to indirectly support manufacturing operations is often referred to as Indirect CA It involves capturing data regarding the flow of items through automatic means such as bar coding, a using this information in planning and scheduling production activities. Answer : (d) Reason : In ABC classification system of materials management, the materials manager classifies the materials to three categories: ‘A’, ‘B’, and ‘C’ on the basis of value of consumption (also called usage value). T technique of materials management does not consider the availability of materials. Answer : (e) Reason : Several factors that are believed to affect the productivity in an organization are: •

Bottlenecks in the production process can hamper productivity.



Training programs affect productivity. The time spent by the employees in learning new technolo reduces their productivity as the time spent by the employees in learning new technology reduc their productivity as the time spent on training eats into the total effective work time.



The total production cycle time has an impact on total productivity.



The productivity of an organization may also suffer if social and legal obligations make it necessa for it to employ people without adequate skills.



Workers often believe that their employers are exploiting them by increasing their workload fro time to time on the pretext of improving productivity. Therefore, they resort to strikes, there leading to loss of productivity.

Answer : (a) Reason : EDI is a system, wherein standardized forms of electronic documents are transferred between two computer systems. Customers and suppliers or departments within the same organization can share and transmit information electronically in real time using EDI. Answer : (c) Reason : JIT firms do not maintain separate departments for correcting defects. Each employee has to identify a correct his or her own mistakes and send it to his or her immediate customer. Every worker analyses t types and sources of errors and then develops methods to prevent them in the future. In case a work delivers a defective item or an improperly finished item to his immediate customer, the worker w identifies the defect is authorized to stop the process and take necessary actions thereafter. Hence, option (c) is false. Answer : (a) Reason : Through globalization, organizations can achieve economies of scale. But when customers’ requireme in different national markets are totally different, an organization’s globalized activities may becom uneconomical due to the need for customization of products and services, emphasized as econom impediments. Answer : (c) Reason : After sales costs does not form a category of cost in quantifying the inputs, in the calculation productivity. Answer : (d) Reason : If a firm schedules too much capacity, the facilities may remain idle, resulting in wastage of resourc Scheduling low capacity may result in incomplete jobs at the specified time, resulting in poor service customers. Answer : (b) Reason : Bt = N (P1 + P2 + P3 + … + P4) + Bt-1 P1 + Bt-2 P2 + …+ B1 Pt-1 N = 22 and t = 4 B1 = NP1 = 22 × 0.1 = 2.2

B2 = N ( P1 + P2 ) + B1 P1 = 22 ( 0.1 + 0.2 ) + 2.2 ( 0.1) = 6.6 + 0.22 = 6.82 B3 = N ( P1 + P2 + P3 ) + B2 P1 + B1 P2 = 22 ( 0.1 + 0.2 + 0.3 ) + 6.82 ( 0.1) + 2.2 ( 0.2 )

Suggested Answers with Examiner's Feedback

Page 25 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only. = 13.2 + 0.682 + 0.44 = 14.322 ; 14.32

B4 = N ( P1

+ P2 + P3 + P4 ) + B3 P1 + B2 P2 + B1 P3

= 22 ( 0.1 + 0.2 + 0.3 + 0.1) + 14.32 ( 0.1) + 6.82 ( 0.2 ) + 2.2 ( 0.3) = 22 ( 0.7 ) + 14.32 ( 0.1) + 6.82 ( 0.2 ) + 2.2 ( 0.3) = 15.4 + 1.432 + 1.364 + 0.66 = 18.856 ; 18.86 Hence, expected number of breakdowns in the 4th quarter = 18.86 Total cost of maintenance for every

4

quarters

= TC( = CP N + CR B

( 750 × 22 ) + ( 4200 × 18.86 ) = 16500 + 79212 = Rs. 95,712 Average total cost per period = TC(t) / t ∴Average total cost per quarter = TC (t) / t = 95712 / 4 = Rs. 23,928.

∴Average total cost per month = Average total cost per quarter / t = 23928 / 4 = Rs.5,982. 69. 70.

Answer : Reason : Answer : Reason :

71.

Answer : Reason :

72.

Answer : Reason :

73.

Answer : Reason :

(d) Reducing employee turnover is not a principle of supply chain management. (a) Firms use a practice of discontinuing the production, if they faced any problem. In Japanese, this pract is called ‘Andon’. (c) Staggered times is the option given to employees, where the employees can select their work hours fro a list of available shifts. (d) Improvement in the quality of product or service is an operational benefit that firms derive from the u of JIT systems. It is not a benefit that suppliers derive from using JIT systems. (a) Critical ratio = Planned time remaining / Actual work remaining. Planned time remaining = Planned days (-) Time elapsed since beginning the work. Jobs

74.

Answer : Reason :

75.

Answer : Reason :

76.

Answer : Reason :

Actual work remaining 9

Critical Ratio

A

Planned time remaining 58 – 51 = 7

Priority Order

7 / 9 = 0.78

B

B

61 – 51 = 10

15

10 / 15 = 0.67

A

C

65 – 51 = 14

13

14 / 13 = 1.08

E

D

70 – 51 = 19

18

19 / 18 = 1.06

D

E

67 – 51 = 16

16

16 / 16 = 1

C

The lower the critical ratio, the higher the priority needed in sequencing the job in the next day production activities. From the table, it can be observed that job B has the lowest critical ratio and hen the highest priority, while job C has the highest critical ratio (ahead of schedule) and thus the low priority. (e) Performance can be split into qualitative and quantitative performance. Quantitative performance, a called productivity, is the output produced using a given set of inputs. The prosperity of nations a organizations alike is considered dependent on their comparative productivity. Productivity provides good measure of performance at the national, industry, or individual business level. (d) According to the AOA convention, the following statements are true: • Activities are represented by arrows. • Nodes called as events, are used to connect predecessor and successor activities. • The activities are identified with a number or name. (c) The backward scheduling method schedules orders according to their due dates. The operations manag obtains the due dates for the job orders and develops the schedule backwards, thereby determining t latest point when the production activity can be started in order to complete the order on time.

Suggested Answers with Examiner's Feedback

77.

78.

Answer : (a) Reason : Firms that produce the same product repeatedly can benefit by following JIT production systems. Sin the process of production is repetitive, movement of materials can be minimized by placing the equipme in cells, where a cell is a grouping of several types of machines in which each machine performs a sing operation repeatedly. Answer : (a) Reason : According to the rule of Slack Time Remaining, the jobs with the shortest slack time are dispatched fir Slack Time = Due Date (–) Processing Times. Slack times for the five jobs are: A: 7 – 4 = 3 B: 8 – 6 = 2 C: 5 – 3 = 2 D: 6 – 5 = 1 E: 4 – 2 = 2 As the slack times for the jobs B, C and E are same, these jobs are planned based on their processi times i.e., the job with the smallest processing time is planned first. Therefore, the order of the jobs according to their slack time remaining is D – E – C – B – A. The average delay of a job is calculated as follows: Processing Time Due date Job sequence Time Flow Delay

79.

Answer : Reason :

80.

Answer : Reason :

81.

82.

Page 26 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

D 5 6 0+5=5 0 E 2 4 5+2=7 3 C 3 5 7 + 3 = 10 5 B 6 8 10 + 6 = 16 8 A 4 7 16 + 4 = 20 13 The average delay of a job = (0 + 3 + 5 + 8 + 13)/5 = 29/5 = 5.8 days (a) Consumer demand is the force shaping the supply chain management that emphasizes that the key foc of an organization is to find a balance between cost and quality, and customization and availabil without compromising on any one of them. The objective of supply chain management is to keep t customers satisfied by providing them with what they want, when they want it and at a price they c afford. (c) The implementation of JIT principles is difficult as it has to overcome the following barriers: •

Workers’ resistance to change



Difficulty in accomplishing zero lead-time



Zero safety stock

• Zero idle time. Zero stock-out costs is not a barrier of JIT implementation. Answer : (d) Reason : Some procedures that enable the conversion of internal setup activities into external setup activities are •

Heating



Cleaning

• Streamline work. Fabricating is not one of the procedures that enable the conversion of internal setup activities into extern setup activities Answer : (b) Reason : Backward Scheduling: Time (Hrs) M1 M2

1

2

3

4

5

6

7

8

X1

X1

Y2

Y2

X3

X3

X3

Y1

Y1

X2

Y3

Suggested Answers with Examiner's Feedback

83.

Answer : Reason :

84.

Answer : Reason :

85.

Answer : Reason :

Page 27 of 27

Edited by Foxit PDF Editor Copyright (c) by Foxit Software Company, 2004 For Evaluation Only.

Here, the job of producing 600 nuts can start latest in the 2nd hour, and the job for producing 600 bo also can start latest in the 2nd hour, using the given sequence and machines so as to finish them by the e of 8 hours. (c) The aesthetics value of a product or service is influenced by individual preferences. Companies use t quality dimension to cater to a niche market. (e) Apart from janitorial and maintenance services, other complex services like waste management, water treatment and management, asset protection services, health facilities management, etc. have come unde the scope of facilities management. (b) n = 25, N = 10. 1 2 3 4 5 6 7 8 9 10 Sample Number of 2 3 2 1 1 3 1 4 1 2 defectives (c) Fraction 0.08 0.12 0.08 0.04 0.04 0.12 0.04 0.16 0.04 0.08 defective (p) c

=

Number of defectives

Fraction defective (p) = n

∑p P=

Sample size

0.8

N = 10 = 0.08

Control limits for the P-chart or the fraction defective chart for the given data are P+3

(

P 1− P

)

n

UCL =

0.08 + 3

0.08 (1 − 0.08 ) 25

=

0.0736 25

= 0.08 + 3

= 0.08 + 3

0.002944

= 0.08 + 3 (0.0543) = 0.08 + 0.1629 = 0.2429 P−3

(

P 1− P n

LCL =

)

0.08 − 3

0.08 (1 − 0.08 ) 25

=

0.0736 = 0.08 – 3

25

= 0.08 – 3

0.002944

= 0.08 – 3 (0.0543) = 0.08 - 0.1629 = - 0.0827 LCL cannot be negative (-ve), so it should be taken as zero. CL = P = 0.08. 86.

Answer : (c) Reason :

Globalization can be defined as the removal of trade barriers between an economy and other economi The barriers can be in the form of restriction of the flow of goods or services, capital, informatio knowledge, and ideas between economies. Currency is not a barrier between an economy and oth economies, as every economy’s currency can be converted into the standard currency i.e., dollar. < TOP OF THE DOCUMENT >