Ref: APL / 660 /Civil FQA / Mundra / SEPCO 3 / 0 To, The Project Manager, M/s Simplex Infrastructures Limited C/o SEPCO III, APL, Mundra

dated: 02.02.2009

Sub: Mix M10 Proportions for use in Works for Construction of 5 x 660 MW TPP at Mundra Adani Power Limited. Sir, Please find enclosed here with the Mix Proportions of grade M10 for arranging the trial mixes as to ascertain the CCS and Workability. Please note that its actual use shall be after the approval of trial mix results. Thanking You. Yours truly

[K.P.Chakerwarti] Deputy General Manager, Field Quality Assurance 5 x 660 MW, Mundra TPP. Encl.: as above Copy to 1. VP /AVP / GM Civil APL, Mundra …By email 2. Manager, Field Quality, SEPCO 3 Mundra TPP Village Siracha … By Hard copy

Related Documents

Letter To Sil For M10
December 2019 13
M10
October 2019 20
Sil
June 2020 20
Resume For Bobby (sil)
June 2020 18
Sil Farmakosos
November 2019 31
M10 Planning
November 2019 12

More Documents from ""