Sonadih2nd clinker line Project

Learning from Project Part-3

-KV Siva ram sarma Learnings from project 1

1

Sonadih2nd clinker line Project

7. Civil inputs for electrical buildings

Learnings from project 2

2

Sonadih2nd clinker line Project Contents

1.

Main Transformer

2.

Switch yard gantries

3.

Departmental substation

4.

a.

Distribution transformer rooms

b.

MV & LV Switchgear

c.

Capacitor rooms

d.

PLC rooms

e.

Cable cellar rooms

Central control room

Learnings from project 3

3

1.Main transformer

Sonadih2nd clinker line Project



Main transformer should be always out door type.



Lafarge mandatory safety requirements for main transformer are to be followed.



Main transformer to be mounted on at least 90 lb rails. (Refer animation for the typical arrangement)



Main transformer & the switch yard to be protected by a fence of at least 2.5 mtr height & the fence to be grounded at least two points.



Main transformer neutral to be grounded separately with a separate color – Switch yard general earthing – Green color.Transformer neutral earthing – Black color.

Learnings from project 4

4

Sonadih2nd clinker line Project

1.Main transformer- oil soak pit requirements

Courtesy – IE rules – 1956 Rev 2000 •

The location of the oil soak pit should be out side the switch yard



The capacity of the soak pit should be suitable for the entire oil capacity of the live transformer

Learnings from project 5

5

Sonadih2nd clinker line Project

1.Main transformer-Cable trenches

Courtesy – IE rules – 1956 Rev 2000 It is preferred that the cable trenches in side switch yard are covered with concrete slabs

Learnings from project 6

6

Sonadih2nd clinker line Project

1.Main transformer-Lightning protection

Courtesy – IE rules – 1956 Rev 2000 Out door switchyard is to be protected from lightning by suitable measures/ Lightning masts are to be provided & the calculations are to be submitted to CEIG . Lightning protection drawings are also to be supplied by the designer.

Learnings from project 7

7

Sonadih2nd clinker line Project

2.Switchyard towers & gantries



Switchyard structures should be of bolted structures and should be of GI angular structures/ pipe structures.



Switchyard structures should be low bay type.



IPS aluminium tubular conductor type switchyard is preferred.



Switchyard equipment creepage distances should be at least class-3 of IEC 34.



The lightning arresters should be with min discharge current of 10 kA and should be metal oxide and gapless type.



Each bay is to be supported by a breaker, Isolator with earth switch , set of CT,set of lightning arresters PT may be based on the requirement.

Learnings from project 8

8

Sonadih2nd clinker line Project

3. Department substations – rooms lay out



The substation rooms mainly contain two floors above FGL , cable cellar room & panel room.



Typical elevation of an electrical room is shown below -

Beam bottom AC & PV duct False ceiling PNL Height

Cable cellar room

Cable tray

Finished ground level

Learnings from project 9

9

Sonadih2nd clinker line Project

3. Department substations - General



The substation rooms mainly contain two floors above FGL , cable cellar room & panel room

S.No

Level

Height from FGL for Aluminium cables

Height from FGL for Copper cables -

1

Technical floor for MV substations & substations with high cable density

2.1 mtr beam bottom

2.1 mtr beam bottom

2

Technical floor for LV electrical rooms (Low cable density)

1.2 mtr beam bottom

1.2 mtr beam bottom

3

Panel height

2.2 mtr (working height) refer Lafarge std

2.2 mtr (working height) refer Lafarge std

4

Space between Panel & false ceiling

Not less than 0.8 mtr

Not less than 0.8 mtr

5

Space between false ceiling & room beam bottom

Not less than 0.8 mtr beam bottom for AC / Ventilation ducting provision

Not less than 0.8 mtr beam bottom for AC / Ventilation ducting provision

6

Learnings from project 10

Considered Aluminium armoured cables for Indian Scenario

10

Sonadih2nd clinker line Project

3. Department substations –Cable cellar rooms

Cable cellar typical arrangement shown below for the major substations for small LV elect rooms beam bottom of 1.2 mtr can be accepted instead of 1.8 mtr. 2.1 mtr

1.5 mtr

Cable tray

Cable cellar elevation

1.5 mtr

Cable cellar Plan

Inside cellar rooms adequate space and entry for inspection, laying & termination to be provided. All the cable tray and supports should be of GI & should be mounted on insert plates. Learnings from project 11

11

Sonadih2nd clinker line Project Electrical buildings

Learnings from project 12

12