KEMBARAN A KEPADA PROJ-PV/LUM/N3/4703 JIL 6 – ( BERTARIKH MEI 09 PV03 LIFE FIRING TRIAL 4 MEI – 9 MEI 09 Day 1 – 4 Mei 09 S/No Test Doc No 1. 09040 Q 0405
Activity Description Compass Swing ATP SAT Magnetic Compass
Remarks Result To do remaining of SAT Magnetic Compass. Refer Day Test was conducted and 1 Siri 5(PROJ-PV/LUM/N4/4703 Jil 1 – (9) bertarikh 15 completed. No remaining Apr 09). items.
S/No Test Doc No 1. 09040 Q 0420 J
Activity Description Live Firing : surface Targets. Muzzle Velocity Measurements Firing
2
Live Firing : air targets. Air sensor verification.
Remarks 1. To measure the muzzle velocity of each gun. 15 rounds single shot for 76mm and 20 rounds single shot for 30mm. 2. During the test, a. CSS2 degraded. Operational again by replacement of CABCON card. b. CMS indicate interface link BT Port Error and IFF response time out on BT PORT. ATLAS and THALES need to check further on the interface card. Additional test, request by OEM to ensure the dynamic alignment at correct position.
Day 2 – 5 Mei 09
A-1
Result Test was conducted and completed. No remaining items.
Test was conducted and completed. No remaining items.
)
3
4
09020 Q 0510
5
09040 Q 0414
Live Firing : Surface targets. Surface sensor verification.
Additional test, request by OEM to ensure the dynamic Test was conducted and alignment at correct position. completed. No remaining items.
HVAC ATP HAT
Air Quantity check.
Not Completed. Finished for 2 system (Fan 3H-11 and ACU 01D-11)
Test was fail. RMAF, RMNDA and OEM plan to conduct again test on 12 Mei.
Not Complete.
SAT Internal and External Communication. SECOS Programming and testing.
A-2