LAPORAN

Biaya Pekerjaan Terpasang berdasarkan Uji Mutu Beton dengan Metode Non Destructive Test – Rebound Hammer dan Survey Lapangan Pekerjaan Infrastruktur Desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang, Kalimantan Barat

Maret 2019

POLITEKNIK NEGERI KETAPANG JURUSAN TEKNIK SIPIL PRODI PERANCANGAN JALAN DAN JEMBATAN Jalan Rangga Sentap,Dalong-Sukaharja, Ketapang, Kalimantan-Barat

KATA PENGANTAR

Bersama ini disampaikan Laporan Biaya Pekerjaan Terpasang berdasarkan Uji Mutu Beton dengan Metode Non Destructive Test – Rebound Hammer dan Survey Lapangan Pekerjaan Infrastruktur Desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang, Kalimantan Barat dengan sumber Dana Desa (DD) Silpa T.A 2016 dan T.A 2017. Kegiatan dimulai dengan berangkat ke lokasi survey pada tanggal 28 Desember 2018, pemeriksaan fisik dan pengukuran struktur terpasang dimulai pada tanggal 29 Desember 2018 sampai 30 Januari 2018 dan dilanjutkan kembali ke kota Ketapang pada 31 Desember 2018. Hasil survey kemudian dianalisis selama satu minggu dengan hasil berupa laporan mutu beton karakteristik dan dimensi struktur terpasang. Berdasarkan laporan tersebut dikeluarkanlah laporan biaya pekerjaan terpasang yang dikerjakan dalam waktu satu minggu. Pemeriksaan fisik dan pengukuran struktur terpasang dilakukan guna menghitung biaya pekerjaan terpasang berdasarkan analisa harga satuan dan upah kabupaten Ketapang kecamatan Tumbang Titi tahun 2017. Biaya pekerjaan terpasang dianalisa dan direkomendasikan dalam laporan ini sebagai data pendukung dan panduan tim penyidik unit III TIPIDKOR Kepolisian Negara Repoblik Indonesia Daerah Kalimantan Barat Resor Ketapang. Biaya hasil analisis dan survey lapangan dibandingkan dengan rencana anggaran biaya dana desa dan alokasi dana desa T.A 2016 dan T.A 2017. Semoga laporan ini dapat bermanfaat bagi semua pihak yang memerlukan, dan diucapkan terima kasih kepada semua pihak yang telah terlibat selama pelaksanaan pekerjaan ini.

Ketapang, Politeknik Negeri Ketapang Jurusan Teknik Sipil Prodi Perancangan Jalan dan Jembatan

Maret 2019 Tenaga Pembantu, Ardiansyah Putra, A.Md : Sudirman

:

Alan Putranto, ST.,MT. Saksi Ahli Teknik Sipil

2

Daftar Isi

Halaman Kata Pengantar

2

Daftar Isi

3

1. Pendahuluan 2. Maksud dan Tujuan 3. Lokasi 4. Lingkup Pekerjaan 5. Dokumen dan Data 6. Hasil Survey dan analisis data 7. Kesimpulan Daftar Pustaka

4 4 5 7 9 9 16 17

Lampiran

3

Biaya Pekerjaan Terpasang berdasarkan Uji Mutu Beton dengan Metode Non Destructive Test – Rebound Hammer dan Survey Lapangan Pekerjaan Infrastruktur Desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang, Kalimantan Barat

1. Pendahuluan Pekerjaan pemeriksaan fisik dan struktur terpasang untuk estimasi biaya pekerjaan terpasang berdasarkan Uji Mutu Beton dengan Metode Non Destructive Test – Rebound Hammer dan analisa harga satuan pekerjaan berdasarkan harga satuan dan upah kecamatan Tumbang Titi tahun 2017 Pekerjaan Infrastruktur Desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang, Kalimantan barat dilakukan dalam rangka menindaklanjuti surat dari Kepolisian Resort Ketapang Nomor : B/518/X/Res.3.3./2018/Reskrim-III tertanggal 12 Oktober 2018. Sumber dana pekerjaan infrastruktur desa Mahawa yang ditinjau adalah pekerjaan fisik Dana Desa (DD) Silpa T.A 2016 dan T.A 2017 berupa pekerjaan rabat beton, Pembukaan jalan, Pembangunan balai seni dan budaya dusun rengas, pembangunan lapangan volley, serta pembangunan jembatan tani. Biaya estimasi pekerjaan terpasang disajikan dalam bentuk laporan dan analisa serta dokumentasi dan detail gambar teknis hasil pengukuran lapangan sebagai bahan pertimbangan pendukung dan panduan team penyidik unit III TIPIDKOR Kepolisian Negara Repoblik Indonesia Daerah Kalimantan Barat Resor Ketapang untuk menyelesaikan kasus dugaan Tindak Pidana Korupsi pada pengelolaan Alokasi Dana Desa (ADD) dan Dana Desa (DD) desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang Silpa T.A 2016 dan T.A 2017 sesuai surat Kepolisian Resort Ketapang Nomor : B/518/X/Res.3.3./2018/Reskrim-III.

2. Maksud dan Tujuan Maksud dilakukannya pemeriksaan fisik struktur terpasang di lapangan dan uji hammer test adalah untuk mengestimasi biaya pekerjaan terpasang berdasarkan pedoman harga satuan barang dan jasa kebutuhan pemerintah kabupaten Ketapang tahun anggaran 2017 kecamatan Tumbang Titi sesuai dengan peraturan-peraturan dan kaidah-kaidah perencanaan anggaran biaya. Tujuannya adalah untuk membantu tim penyidik unit III TIPIDKOR Kepolisian Negara Repoblik Indonesia Daerah Kalimantan Barat Resor Ketapang untuk menyelesaikan kasus dugaan Tindak Pidana Korupsi pada pengelolaan Alokasi Dana Desa (ADD) dan Dana Desa (DD) desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang.

4

3. Lokasi Lokasi pemeriksaan fisik pekerjaan struktur terpasang dan uji hammer test berada di Desa Mahawa, Kec. Tumbang Titi, Kab. Ketapang, Kalimantan Barat. Perjalanan ditempuh dalam waktu lebih kurang 3 jam 43 menit dengan jarak tempuh estimasi 110 kilometer seperti ditunjukan gambar 3.1 sampai 3.3

Gambar 3.1 Jarak dan waktu tempuh ke lokasi survey

5

Gambar 3.2 Akses jalan menuju desa Mahawa

Gambar 3.3 Hammer test struktur dan pengukuran dimensi terpasang

6

4. Lingkup Pekerjaan Lingkup pekerjaan ini meliputi pemeriksaan fisik dan mutu beton menggunakan alat hammer test serta pengukuran dimensi terpasang struktur, hasil pemeriksaan menggunakan hammer test kemudian diolah sehingga diperoleh mutu beton dari laporan yang dikeluarkan. Dari data mutu beton dianalisis dan dicari perbandingan campuran penyusun beton yang paling mendekati berdasarkan peraturan yang mengatur sehingga diperoleh komposisi semen : pasir : kerikil dan dihitung volume terpasang. Setelah diketahui volume masing-masing bahan dikalikan harga satuan bahan berdasarkan peraturan bupati Ketapang tentang pedoman harga satuan barang dan jasa kebutuhan pemerintah kabupaten Ketapang kecamatan Tumbang Titi tahun 2017. Jumlah hari dan orang kerja diperoleh dari berita acara pemeriksaan saksi.

Gambar 4.1 Pemeriksaan fisik jembatan tani terpasang

Gambar 4.2 Pengukuran jalan bukaan usaha pertanian

7

Gambar 4.3 Pemeriksaan fisik pekerjaan struktur balai seni dan budaya

Gambar 4.4 Pengukuran ketebalan dinding balai seni dan budaya

8

5. Dokumen dan Data Untuk mendukung analisis biaya struktur terpasang maka diperlukan beberapa data pendukung. Data dan dokumen yang dapat dikumpulkan adalah sebagai berikut : a) Penjabaran anggaran pendapatan dan belanja desa Mahawa tahun anggaran 2017 b) Laporan mutu beton karakteristik dari uji hammer test dan dimensi struktur terpasang c) Berita acara pemeriksaan saksi terkait jumlah dan hari orang kerja di lapangan. d) Peraturan bupati tentang pedoman harga satuan barang dan jasa kebutuhan pemerintah kabupaten Ketapang tahun anggaran 2017.

6. Hasil Analisis Pekerjaan rabat beton Dusun Kekurak No Uraian TOTAL (203.6x1.97x0.1013) A TENAGA Pekerja Mandor B

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

BAHAN LAIN Kayu kelas II uk. 1,8/20 -4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

Satuan m

Jumlah

OH OH

4 1

kg/cm2 23,69

Volume Satuan 40,63 m3 5 5

Per m3 kg 124,07 kg 1233,92 kg 969,00 Liter 215

Total 5041,21 101 50134,9 35 39371,3 29 8735,58 8736

Harga Satuan

Harga

hari hari

75600 99750

1512000 498750

Zak m3 m3 Liter

80000 137500 300000

8065933 4812500 8700000

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

697000 192000 500000 264000 3746728 25242183

C

m2 kg

40,02 0,3

17 12 5 22 15

Mahawa I No Uraian TOTAL (115x1.54x0.1063) A TENAGA Pekerja

Satuan m

Jumlah

OH

4

kg/cm2 41,56

Volume Satuan 18,83 m3 7

hari

Harga Satuan

Harga

75600

2116800 9

B

Mandor

OH

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

Per m3 kg 162,62 kg 1077,60 kg 983,71 Liter 215

BAHAN LAIN Kayu kelas II uk. 1,8/20 4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

1

7 Total 3061,42 61 20286,5 14 18519,1 13 4047,53 4048

hari

99750

698250

Zak m3 m3 Liter

80000 137500 300000

4898278 1925000 3900000

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

861000 224000 700000 372000 2298499 17993827

C

m2 kg

49,07 0,3

Satuan m

Jumlah

OH OH

4 1

21 14 7 31 15

Mahawa II No Uraian TOTAL (78x2x0.0983) A TENAGA Pekerja Mandor B

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

BAHAN LAIN Kayu kelas II uk. 1,8/20 4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

Per m3 kg 230,65 kg 904,59 kg 1003,04 Liter 215

kg/cm2 85,91

Volume Satuan 15,33 m3 4 4

Total 3537,01 71 13871,7 9 15381,5 11 3296,98 3297

Harga Satuan

Harga

hari hari

75600 99750

1209600 399000

Zak m3 m3 Liter

80000 137500 300000

5659217 1237500 3300000

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

287000 64000 400000 216000 1915848 14688165

C

m2 kg

15,6 0,3

7 4 4 18 15

10

Punuk RT/RW 04/02 No Uraian TOTAL (92x1.53x0.1057) A TENAGA Pekerja Mandor B

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

BAHAN LAIN Kayu kelas II uk. 1,8/20 4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

Satuan m

Jumlah

OH OH

4 1

kg/cm2 26,51

Volume Satuan 14,878332 m3 7 7

Per m3 Total kg 130,98 1948,7 39 kg 1200,92 17867,7 12 kg 971,93 14460,7 10 Liter 215 3198,84 3199

Harga Satuan

Harga

hari hari

75600 99750

2116800 698250

Zak m3 m3 Liter

80000 137500 300000

3117916 1650000 3000000

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

369000 80000 700000 372000 1759795 13863761

C

m2 kg

19,45 0,3

Satuan m

Jumlah

OH OH

4 1

9 5 7 31 15

Punuk RT/RW 01/01 No Uraian TOTAL (204.46x1.52x0.1129) A TENAGA Pekerja Mandor B

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

BAHAN LAIN Kayu kelas II uk. 1,8/20 4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

kg/cm2 31,17

Volume 35,09

Satuan m3

Harga Satuan

Harga

14 14

hari hari

75600 99750

4233600 1396500

Zak m3 m3 Liter

80000 137500 300000

7948852 3850000 7500000

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

820000 208000 1400000 732000 4213343 32302295

Per m3 Total kg 141,59 4968,03 99 kg 1154,96 40524 28 kg 976,16 34250,4 25 Liter 215 7543,7 7544

C

m2 kg

46,2 0,3

20 13 14 61 15

11

Dusun Renggas Rabat Beton II No Uraian TOTAL (247.4x2.073x0.12) A TENAGA Pekerja Mandor B

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

BAHAN LAIN Kayu kelas II uk. 1,8/20 4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

Satuan m

Jumlah

OH OH

4 1

Per m3 kg 100,78 kg 1369,31 kg 957,85 Liter 215

kg/cm2 15,38

Volume Satuan 61,543224 m3

Harga Satuan

Harga

hari hari

75600 99750

3628800 1197000

Zak m3 m3 Liter

80000 137500 300000

9923968 8250000 12900000

25 17 12 52 15

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

1025000 272000 1200000 624000 5853115 39020768

Volume 18,9846

Satuan m3

Harga Satuan

Harga

3 3

hari hari

75600 99750

907200 299250

Zak m3 m3 Liter

80000 137500 300000

534881 6050000 3600000

btg kg Hari Liter %

41000 16000 100000 12000 Total biaya

656000 176000 300000 156000 1901900 14581231

12 12 Total 6202,48 124 84271,5 60 58949,2 43 13231,8 13232

C

m2 kg

59,376 0,3

Lapangan bola volley No Uraian TOTAL (19.9x10.6x0.09) A TENAGA Pekerja Mandor B

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

BAHAN LAIN Kayu kelas II uk. 1,8/20 4m Paku Sewa molen Solar (diesel 8 HP ) EE Overhead + Profit Biaya total

Satuan m

Jumlah

OH OH

4 1

Per m3 kg 17,61 kg 3280,02 kg 869,18 Liter 215

kg/cm2 0,41

Total 334,301 7 62269,8 44 16501,1 12 4081,69 4081

C

m2 kg

36,8 0,3

16 11 3 13 15

12

Dusun Renggas Rabat Beton I No Uraian TOTAL (101.8x1.518x0.089) A TENAGA Pekerja Mandor B

C

Satuan m

Jumlah

OH OH

4 1

BAHAN Semen Portland Pasir Beton Kerikil (split 2-3) Air

Per m3 kg 134,47 kg 1185,20 kg 973,36 Liter 215

BAHAN LAIN Kayu kelas II uk. 1,8/20 -4m Paku Sewa molen Solar (diesel 8 HP )

m2 kg

kg/cm2 28

Volume 13,680902

Satuan m3

Harga Satuan

Harga

7 7

hari hari

75600 99750

2116800 698250

37 11 9 2941

Zak m3 m3 Liter

80000 137500 300000

2943438 1512500 2700000

21 14 7 31

btg kg Hari Liter

861000 224000 700000 372000

15

%

41000 16000 100000 12000 Total biaya

Total 1839,65 16214,6 13316,4 2941,39

49,07 0,3

EE Overhead + Profit Biaya total

1819198 12127988

JEMBATAN TANI 1

No 1

URAIAN

SATUAN

HARGA

JUMLAH (RP)

20 5

OH OH

75600 99750

1512000 498750

0.8622 45 25 6

m3 Btg Kg m3

6750000 15000 40000 150000

5819850 675000 1000000 900000

Jasa Tukang Mandor

2

VOLUME

Bahan terpasang Kayu Belian Baut Paku beton campur Tanah timbunan EE Overhead + profit 15% Total biaya

1560840 11966440

13

JEMBATAN TANI 2

No 1

URAIAN

SATUAN

HARGA

JUMLAH (RP)

20 5

OH OH

75600 99750

1512000 498750

0.7146 45 25

m3 Btg Kg

6750000 15000 40000

4823550 675000 1000000 1276395 9785695

VOLUME

SATUAN

HARGA

JUMLAH (RP)

120

OH

75600

9072000

4

Bh

21000

84000

2.329 0.6566 0.36 70 12 25 32 5 4 4 17 30 10 3 15 5 1 70 45 60 15 1 2

m3 m3 m3 Kp Kp Kp Zak m3 m4 Roll Bh Kg roll Kg Kg Kg Roll Kotak Kg Kg Kg Bh Bh

6750000 2700000 2850000 57000 56000 55000 80000 137500 300000 500000 3000 16000 271000 35000 26000 22000 180000 133000 40000 65000 57000 1000000 1017000

15720750 1772820 1026000 3990000 672000 1375000 2560000 687500 1200000 2000000 51000 480000 2710000 105000 390000 110000 180000 9310000 1800000 3900000 855000 1000000 2034000

Jasa Tukang Mandor

2

VOLUME

Bahan terpasang Kayu Belian Baut Paku beton campur EE Overhead + profit 15% Total biaya

BALAI SENI DAN BUDAYA

No

URAIAN

1 Jasa Pekerja 2 Alat Kuas 3 Bahan terpasang Kayu Belian Kayu Kelas II Papan kayu kelas II Seng gelombang BJLS Seng plat Tripleks Semen (SNI/50 kg) Pasir Batu Jaring kasa Batako Paku campur Kawat simpai Kawat bendrat Paku atap Paku tripleks Terpal Keramik polos Cat dasar @5 kg Cat tembok @5 kg Cat minyak @1 kg Pintu 2 daun kayu belian Pintu 1 daun kayu belian

14

Pintu 1 daun kayu kelas II Jendela + kaca Ventilasi kayu belian 0.4 x 0.66 Ventilasi kayu belian 0.4 x 0.8 Kunci tanam Engsel pintu Engsel jendela Kait angin jendela Handle pintu stainless Handle jendela Kunci slot jendela Kunci slot pintu Kloset jongkok standard Septick tank kayu belian Pipa PVC 4" Elbow 4" Lem PVC EE Overhead + profit 15% Total biaya

1 13 14 2 4 25 39 26 1 13 13 3 1 1 2 2 2

Bh Bh Bh Bh Set Bh Bh Bh Set Bh Bh Bh Bh Bh Bh Bh Bh

700000 600000 300000 350000 740000 10000 8000 10000 250000 30000 25000 40000 280000 565000 80000 32000 17000

700000 7800000 4200000 700000 2960000 250000 312000 260000 250000 390000 325000 120000 280000 565000 160000 64000 34000 12368261 94823331

Honorarium tim TPK tidak boleh dicantumkan dalam RAB masing-masing kegiatan pembangunan fisik, karena honorarium dalam hal ini adalah dimaksudkan untuk tenaga ahli (konsultan perencana/pengawas) sesuai PERMENDAGRI No 113 Tahun 2014 tentang pengelolaan keuangan desa, meskipun dalam peraturan pemerintah pasal 82 ayat (3) penerimaan lain yang sah sebagaimana dimaksud pada ayat (1) dapat bersumber dari APB Desa dan sumber lainnya sesuai ketentuan peraturan perundang-undangan. Kegiatan pembukaan badan jalan di desa Mahawa yang menggunakan alat berat tidak dapat dihitung biaya sewa menggunakan pendekatan keteknikan karena tidak diketahuinya beberapa komponen yang dapat menunjang analisis, sehingga diambil dari berita acara pemeriksaan saksi yaitu sebesar Rp. 10.000.000,-.

15

KESIMPULAN Dari hasil tinjau lapangan dan analisis data serta evaluasi terhadap data pendukung maka dapat diberikan beberapa kesimpulan terkait hasil tinjau lapangan pekerjaan fisik terpasang di Desa Mahawa, Kec. Tumbang Titi yaitu sebagai berikut. 1. Rabat beton dusun Kekurak struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 203.6x1.97x0.1013 bernilai Rp. 25.242.183 2. Rabat beton dusun Mahawa I struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 115x1.54x0.1063 bernilai Rp. 17.993.827 3. Rabat beton dusun Mahawa II struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 78x2x0.0983 bernilai Rp. 14.688.165 4. Rabat beton dusun Punuk RT/RW 04/02 struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 92x1.53x0.1057 bernilai Rp. 13.863.761 5. Rabat beton dusun Punuk RT/RW 01/01 struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 204.46x1.52x0.1129 bernilai Rp. 32.302.295 6. Rabat beton dusun Rengas II struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 247.4x2.073x0.12 bernilai Rp. 39.020.768 7. Lapangan bola volley struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 19.9x10.6x0.09 bernilai Rp. 14.581.231 8. Rabat beton dusun Rengas I struktur terpasang berdimensi meter panjang x lebar x tebal secara berturut-turut 101.8x1.518x0.089 bernilai Rp. 12.127.988 9. Struktur terpasang jembatan kayu tani 1 bernilai Rp. 11.966.440 10. Struktur terpasang jembatan kayu tani 2 bernilai Rp. 9.785.695 11. Bangunan terpasang balai seni dan budaya bernilai Rp. 94.823.331 12. Pembukaan badan jalan bernilai Rp. 10.000.000

16

DAFTAR PUSTAKA

Undang-Undang Republik Indonesia No 6 Tahun 2014 Tentang Desa SNI 7394:2008 Tata cara perhitungan harga satuan pekerjaan beton untuk konstruksi bangunan gedung dan perumahan Peraturan menteri pekerjaan umum republik Indonesia No. 11/PRT/M/2013 tentang Pedoman Analisa Harga Satuan Bidang Pekerjaan Umum Peraturan bupati tentang pedoman harga satuan barang dan jasa kebutuhan pemerintah kabupaten Ketapang tahun anggaran 2017 Peraturan Pemerintah Republik Indonesia No 47 Tahun 2015 tentang Perubahan atas peraturan pemerintah nomor 43 tahun 2014 tentang peraturan pelaksanaan undangundang nomor 6 tahun 2014 tentang desa Peraturan pemerintah nomor 43 tahun 2014 tentang peraturan pelaksanaan undang-undang nomor 6 tahun 2014 tentang desa

17

LAMPIRAN Perbandingan membuat 1 m3 beton AHSP No 11 Tahun 2013

No

Uraian

B

TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

L.01 L.02 L.03 L.04

BAHAN Semen Portland Pasir Beton Kerikil Air

Cacatan : Bobot isi pasir Bobot isi kerikil Buckling factor pasir

250

275

300

1.65 0.28 0.03 0.08

1.65 0.28 0.03 0.08

1.65 1.65 0.275 0.275 0.028 0.028 0.083 0.083

1.65 0.28 0.03 0.08

1.65 0.275 0.028 0.083

1.65 0.275 0.028 0.083

352 731 1031 215

384 692 1039 215

406 684 1026 215

413 681 1021 215

Kode Satuan 100

A

150

Koefisien K-(x) kg/cm2 200 175 225

OH OH OH OH

1.65 1.65 0.275 0.275 0.028 0.028 0.083 0.083

kg kg kg Liter

1400 1350 20

125

247 869 999 215

276 828 1012 215

299 326 799 760 1017 1029 215 215

371 698 1047 215

kg/m3 kg/m3 %

AHSP No 11 tahun 2013 1200

y = 890.2x0.0268 R² = 0.5001

Kg

1000

800 y = 2645.8x-0.241 600 R² = 0.98

Semen Portland

400

Power (Semen Portland)

Pasir Beton Kerikil

Power (Pasir Beton)

y = 27.046x0.4813 R² = 0.9964

200

Power (Kerikil)

0 0

100

200

300

400

K- (x) kg/cm2

18