Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG "A" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015

URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN, TANAH, PONDASI 1. Pasang Bowplank 2. Galian tanah pondasi 3. Urugan tanah pilihan dalam bangunan 4. Urugan Pasir dibawah lantai 5. Urugan pasir dibawah pondasi 6. Timbunan tanah kembali pondasi II PEKERJAAN BATU / BETON 1. Timbrisan batu kosong 2. Pasangan pondasi batu kali, Sp. 1 : 4 3. Pasangan dinding batu bata, Sp. 1 : 5 4. Coor lantai, Sp. 1 : 3 : 5 T = 5 cm 5. Beton bertulang, Sp. 1 : 2 : 3 a. Beton sloop 15/20 (besi 171,227 Kg/M3 + Bekisting 2 x pakai) b. Beton kolom 15/15 (besi 215,904 Kg/M3 + Bekisting 2 x pakai) c. Beton kolom 12/15 (besi 199,77 Kg/M3 + Bekisting 2 x pakai) d. Beton ring balok 15/20 (besi 171,227 Kg/M3 + Bekisting 2 x pakai) e. Beton ring balok 12/15 (besi 199,775 Kg/M3 + Bekisting 2 x pakai) 6. Plesteran dinding, Sp. 1 : 5, tebal 15 mm 7. Plesteran beton, Sp. 1 : 4, tebal 15 mm 8. Pasang Keramik Lantai 40 x 40 cm (warna) 9. Pasang Keramik Lantai 40 x 40 cm Anti Sleep warna 10. Pas.Plint tegel ukuran 10 x 40 cm 11. Pembuatan saluran air hujan 30 x 30 cm (keliling bangunan) III. PEKERJAAN KAYU / ATAP / PLAFOND 1. Kosen pintu aluminium 4" 2. Pemasangan pintu rolling door aluminium 3. Kuda-Kuda Konsol 5/10 4. Gording Konsol 5/7 5. Menutup Atap Kios Seng Soka Jempol Aluminium (warna Biru) 6. Pas Rangka Atap Kios Baja Ringan Rangka Zincalume C 75.100 + C 752.8725,73 7. Menutup Atap Kios Seng Soka Jempol Aluminium (warna Biru) 8. Bubungan Seng Soka Jempol (warna biru) 9. Listplank kayu 3/28 + 3/13 cm kayu kelas II 10. Rangka plafond 4/5 kayu kelas III 11. Penutup plafond tripleks 3 mm 12. Profil list plafond Sp. 3 cm 13. Bout Ø 14

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

67.60 70.15 65.64 10.20 5.50 18.87

M M3 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19 0.11 4.13 0.28 719.53 39.83 145.80 82.88 168.30 59.60

M3 M3 M3 M3 M3 M2 M2 M2 M2 M2 M

108.90 18.00 0.31 0.51 75.95 282.73 282.73 24.50 126.84 2.03 273.95 451.48 60.00

M1 Unit M3 M3 M2 M2 M2 M M M3 M2 M Buah

IV PEKERJAAN INSTALASI LISTRIK 1 Pasang Instalasi Listrik 2 Pasang Stop Kontak 3 Pasang Vetteng lampu 4 Pasang lampu Philips SL 12 Watt (spiral) 5 Pasang lampu Philips SL 23 Watt (spiral) 6 Pasang saklar double 7 Pasang saklar tunggal 8 Pasang MCB 2 Group + box panel 9 Biaya Penyambungan Daya 900 Watt V PEKERJAAN FINISHING 1 Acian dinding dan beton 2 Mengecet dinding dan beton dengan metrolite warna 3 x 3 Mengecet plafond dengan metrolite warna 3 x 4 Mengecet list plafond dengan cat minyak (setara gloteks) 5 Mengecet listplank dengan cat miyak (setara gloteks) 6 Mengecet Kuda-Kuda Konsol dengan cat miyak (setara gloteks) VI PEKERJAAN AKHIR 1 Administrasi / Dokumentasi 2 Pembersihan Akhir

44.00 Ttk 18.00 Bh 26.00 Bh 8.00 Bh 18.00 Bh 8.00 Bh 10.00 Bh 1.00 Unit 1.00 Ls 747.43 747.43 273.95 13.54 38.69 15.50

M2 M2 M2 M2 M2 M2

1.00 1.00

Ls Ls

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

67.60 70.15 65.64 10.20 5.50 18.87

M M3 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19 0.11 4.13 0.28 719.53 39.83 145.80 82.88 168.30 59.60

M3 M3 M3 M3 M3 M2 M2 M2 M2 M2 M

108.90 18.00 0.31 0.51 75.95 282.73 282.73 24.50 126.84 2.03 273.95 451.48 60.00

M1 Unit M3 M3 M2 M2 M2 M M M3 M2 M Buah

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 114,070.00 240,240.00 240,240.00 24,750.00

0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

432,342.90 808,252.50 123,842.40 775,197.50

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

4,924,025.16 6,654,227.21 7,051,723.17 5,791,411.83 6,793,773.17 62,847.62 63,983.70 145,667.50 152,817.50 33,650.81 180,800.55

0 0 0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

45,097.25 3,452,285.38 6,353,820.00 5,500,055.00 72,396.50 164,185.08 72,396.50 30,005.25 77,398.75 5,690,850.00 41,778.00 15,790.50 5,000.00

0 0 0 0 0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

-

44.00 Ttk 18.00 Bh 26.00 Bh 8.00 Bh 18.00 Bh 8.00 Bh 10.00 Bh 1.00 Unit 1.00 Ls

-

747.43 747.43 273.95 13.54 38.69 15.50

M2 M2 M2 M2 M2 M2

-

1.00 1.00

Ls Ls

-

-

140,855.00 26,092.00 9,592.00 38,957.60 47,207.60 34,342.00 26,092.00 50,842.00 2,500,000.00

0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

38362.5 20116.25 25066.25 38089.15 38089.15 38089.15

0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

500000 500000

0 0

TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG "A" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

NO

URAIAN PEKERJAAN

I II III IV V VI

PEKERJAAN PERSIAPAN, TANAH, PONDASI PEKERJAAN BATU / BETON PEKERJAAN KAYU / ATAP / PLAFOND PEKERJAAN INSTALASI LISTRIK PEKERJAAN FINISHING PEKERJAAN AKHIR TOTAL PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ……………………………… Ketua

2.

2. ……………… Sekretaris

3.

3. ……………………………… Anggota

4.

4. ……………… Anggota

5.

5. ……………………………… Anggota

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

TETAP

Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG "B" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0

URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN, TANAH, PONDASI 1. Pasang Bowplank 2. Galian tanah pondasi 3. Urugan tanah pilihan dalam bangunan 4. Urugan Pasir dibawah lantai 5. Urugan pasir dibawah pondasi 6. Timbunan tanah kembali pondasi II PEKERJAAN BATU / BETON 1. Timbrisan batu kosong 2. Pasangan pondasi batu kali, Sp. 1 : 4 3. Pasangan dinding batu bata, Sp. 1 : 5 4. Coor lantai, Sp. 1 : 3 : 5 T = 5 cm 5. Beton bertulang, Sp. 1 : 2 : 3 a. Beton sloop 15/20 (besi 171,227 Kg/M3 + Bekisting 2 x pakai) b. Beton kolom 15/15 (besi 215,904 Kg/M3 + Bekisting 2 x pakai) c.Beton kolom 12/15 (besi 199,77 Kg/M3 + Bekisting 2 x pakai) d. Beton ring balok 15/20 (besi 171,227 Kg/M3 + Bekisting 2 x pakai) e. Beton ring balok 12/15 (besi 199,775 Kg/M3 + Bekisting 2 x pakai) 6. Plesteran dinding, Sp. 1 : 5, tebal 15 mm 7. Plesteran beton, Sp. 1 : 4, tebal 15 mm 8. Pasang Keramik Lantai 40 x 40 cm (warna) 9. Pasang Keramik Lantai 40 x 40 cm Anti Sleep warna 10. Pas.Plint tegel ukuran 10 x 40 cm 11. Pembuatan saluran air hujan 30 x 30 cm (keliling bangunan) III. PEKERJAAN KAYU / ATAP / PLAFOND 1. Kosen pintu aluminium 4" 2. Pemasangan pintu rolling door aluminium Uk. 175 x 210 cm/unit 3. Kuda - kuda 5/10 kayu kelas II 4. Gording 5/7 kayu kelas II 5. Menutup Atap Konsol Seng Soka Jempol Aluminium (warna Biru) 6. Pas Rangka Atap Kios Baja Ringan Rangka Zincalume C 75.100 + C 75.75 7. Menutup Atap Seng Soka Jempol Aluminium (warna Biru) 8. Bubungan Seng Soka Jempol (warna biru) 9. Listplank kayu 3/28 + 3/13 cm kayu kelas II 10. Rangka plafond 4/5 kayu kelas III 11. Penutup plafond tripleks 3 mm 12. Profil list plafond Sp. 3 cm 13. Bout Ø 14

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

67.60 70.15 65.64 10.20 5.50 18.87

M1 M3 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19 0.11 4.13 0.28 719.53 39.83 145.80 82.88 168.30 59.60

M3 M3 M3 M3 M3 M2 M2 M2 M2 M1 M1

108.90 18.00 0.31 0.51 75.95 282.73 282.73 24.50 126.84 2.03 273.95 451.48 60.00

M1 Unit M3 M3 M2 M2 M2 M1 M1 M3 M2 M1 Bh

IV PEKERJAAN INSTALASI LISTRIK 1 Pasang Instalasi Listrik 2 Pasang Stop Kontak 3 Pasang Vetteng lampu 4 Pasang lampu Philips SL 12 Watt (spiral) 5 Pasang lampu Philips SL 23 Watt (spiral) 6 Pasang saklar double 7 Pasang saklar tunggal 8 Pasang MCB 2 Group + box panel 9 Biaya Penyambungan Daya 900 Watt V PEKERJAAN FINISHING 1 Acian dinding dan beton 2 Mengecet dinding dan beton dengan metrolite warna 3 x 3 Mengecet plafond dengan metrolite warna 3 x 4 Mengecet list plafond dengan cat minyak (setara gloteks) 5 Mengecet listplank dengan cat miyak (setara gloteks) 6 Mengecet Kuda-Kuda Konsol dengan cat miyak (setara gloteks) VI PEKERJAAN AKHIR 1 Administrasi / Dokumentasi 2 Pembersihan Akhir

44.00 Ttk 18.00 Bh 26.00 Bh 8.00 Bh 18.00 Bh 8.00 Bh 10.00 Bh 1.00 Unit 1.00 Ls 747.43 747.43 273.95 13.54 38.69 15.50

M2 M2 M2 M2 M2 M2

1.00 1.00

Ls Ls

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

67.60 70.15 65.64 10.20 5.50 18.87

M1 M3 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19 0.11 4.13 0.28 719.53 39.83 145.80 82.88 168.30 59.60

M3 M3 M3 M3 M3 M2 M2 M2 M2 M1 M1

108.90 18.00 0.31 0.51 75.95 282.73 282.73 24.50 126.84 2.03 273.95 451.48 60.00

M1 Unit M3 M3 M2 M2 M2 M1 M1 M3 M2 M1 Bh

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 114,070.00 240,240.00 240,240.00 24,750.00

0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

432,342.90 808,252.50 123,842.40 775,197.50

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

4,924,025.16 6,654,227.21 7,051,723.17 5,791,411.83 6,793,773.17 62,847.62 63,983.70 145,667.50 152,817.50 33,650.81 180,800.55

0 0 0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

45,097.25 3,452,285.38 6,353,820.00 5,500,055.00 72,396.50 164,185.08 72,396.50 30,005.25 77,398.75 5,690,850.00 41,778.00 15,790.50 5,000.00

0 0 0 0 0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

-

44.00 Ttk 18.00 Bh 26.00 Bh 8.00 Bh 18.00 Bh 8.00 Bh 10.00 Bh 1.00 Unit 1.00 Ls

-

747.43 747.43 273.95 13.54 38.69 15.50

M2 M2 M2 M2 M2 M2

-

1.00 1.00

Ls Ls

-

-

140,855.00 26,092.00 9,592.00 38,957.60 47,207.60 34,342.00 26,092.00 50,842.00 2,500,000.00

0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

38,362.50 20,116.25 25,066.25 38,089.15 38,089.15 38,089.15

0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

500000 500000

0 0

TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG "B" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

NO

URAIAN PEKERJAAN

I II III IV V VI

PEKERJAAN PERSIAPAN, TANAH, PONDASI PEKERJAAN BATU / BETON PEKERJAAN KAYU / ATAP / PLAFOND PEKERJAAN INSTALASI LISTRIK PEKERJAAN FINISHING PEKERJAAN AKHIR TOTAL PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ……………………………… Ketua

2.

2. ……………… Sekretaris

3.

3. ……………………………… Anggota

4.

4. ……………… Anggota

5.

5. ……………………………… Anggota

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

TETAP

Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG "C" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0

URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN, TANAH, PONDASI 1. Pasang Bowplank 2. Galian tanah pondasi 3. Urugan tanah pilihan dalam bangunan 4. Urugan Pasir dibawah lantai 5. Urugan pasir dibawah pondasi 6. Timbunan tanah kembali pondasi II PEKERJAAN BATU / BETON 1. Timbrisan batu kosong 2. Pasangan pondasi batu kali, Sp. 1 : 4 3. Pasangan dinding batu bata, Sp. 1 : 5 4. Coor lantai, Sp. 1 : 3 : 5 T = 5 cm 5. Beton bertulang, Sp. 1 : 2 : 3 a. Beton sloop 15/20 (besi 171,227 Kg/M3 + Bekisting 2 x pakai) b. Beton kolom 15/15 (besi 215,904 Kg/M3 + Bekisting 2 x pakai) c.Beton kolom 12/15 (besi 199,77 Kg/M3 + Bekisting 2 x pakai) d. Beton ring balok 15/20 (besi 171,227 Kg/M3 + Bekisting 2 x pakai) e. Beton ring balok 12/15 (besi 199,775 Kg/M3 + Bekisting 2 x pakai) 6. Plesteran dinding, Sp. 1 : 5, tebal 15 mm 7. Plesteran beton, Sp. 1 : 4, tebal 15 mm 8. Pasang Keramik Lantai 40 x 40 cm (warna) 9. Pasang Keramik Lantai 40 x 40 cm Anti Sleep warna 10. Pas.Plint tegel ukuran 10 x 40 cm 11. Pembuatan saluran air hujan 30 x 30 cm (keliling bangunan) III. PEKERJAAN KAYU / ATAP / PLAFOND 1. Kosen pintu aluminium 4" 2. Pemasangan pintu rolling door aluminium Uk. 175 x 210 cm/unit 3. Kuda - kuda 5/10 kayu kelas II 4. Gording 5/7 kayu kelas II 5. Menutup Atap Konsol Seng Soka Jempol Aluminium (warna Biru) 6. Pas Rangka Atap Kios Baja Ringan Rangka Zincalume C 75.100 + C 75.75 7. Menutup Atap Seng Soka Jempol Aluminium (warna Biru) 8. Bubungan Seng Soka Jempol (warna biru) 9. Listplank kayu 3/28 + 3/13 cm kayu kelas II 10. Rangka plafond 4/5 kayu kelas III 11. Penutup plafond tripleks 3 mm 12. Profil list plafond Sp. 3 cm 13. Bout Ø 14

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

67.60 70.15 65.64 10.20 5.50 18.87

M1 M3 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19 0.11 4.13 0.28 719.53 39.83 145.80 82.88 168.30 59.60

M3 M3 M3 M3 M3 M2 M2 M2 M2 M1 M1

108.90 18.00 0.31 0.51 75.95 282.73 282.73 24.50 126.84 2.03 273.95 451.48 60.00

M1 Unit M3 M3 M2 M2 M2 M1 M1 M3 M2 M1 Bh

IV PEKERJAAN INSTALASI LISTRIK 1 Pasang Instalasi Listrik 2 Pasang Stop Kontak 3 Pasang Vetteng lampu 4 Pasang lampu Philips SL 12 Watt (spiral) 5 Pasang lampu Philips SL 23 Watt (spiral) 6 Pasang saklar double 7 Pasang saklar tunggal 8 Pasang MCB 2 Group + box panel 9 Biaya Penyambungan Daya 900 Watt V PEKERJAAN FINISHING 1 Acian dinding dan beton 2 Mengecet dinding dan beton dengan metrolite warna 3 x 3 Mengecet plafond dengan metrolite warna 3 x 4 Mengecet list plafond dengan cat minyak (setara gloteks) 5 Mengecet listplank dengan cat miyak (setara gloteks) 6 Mengecet Kuda-Kuda Konsol dengan cat miyak (setara gloteks) VI PEKERJAAN AKHIR 1 Administrasi / Dokumentasi 2 Pembersihan Akhir

44.00 Ttk 18.00 Bh 26.00 Bh 8.00 Bh 18.00 Bh 8.00 Bh 10.00 Bh 1.00 Unit 1.00 Ls 747.43 747.43 273.95 13.54 38.69 15.50

M2 M2 M2 M2 M2 M2

1.00 1.00

Ls Ls

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

67.60 70.15 65.64 10.20 5.50 18.87

M1 M3 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19 0.11 4.13 0.28 719.53 39.83 145.80 82.88 168.30 59.60

M3 M3 M3 M3 M3 M2 M2 M2 M2 M1 M1

108.90 18.00 0.31 0.51 75.95 282.73 282.73 24.50 126.84 2.03 273.95 451.48 60.00

M1 Unit M3 M3 M2 M2 M2 M1 M1 M3 M2 M1 Bh

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 114,070.00 240,240.00 240,240.00 24,750.00

0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

432,342.90 808,252.50 123,842.40 775,197.50

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

4,924,025.16 6,654,227.21 7,051,723.17 5,791,411.83 6,793,773.17 62,847.62 63,983.70 145,667.50 152,817.50 33,650.81 180,800.55

0 0 0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

45,097.25 3,452,285.38 6,353,820.00 5,500,055.00 72,396.50 164,185.08 72,396.50 30,005.25 77,398.75 5,690,850.00 41,778.00 15,790.50 5,000.00

0 0 0 0 0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

-

44.00 Ttk 18.00 Bh 26.00 Bh 8.00 Bh 18.00 Bh 8.00 Bh 10.00 Bh 1.00 Unit 1.00 Ls

-

747.43 747.43 273.95 13.54 38.69 15.50

M2 M2 M2 M2 M2 M2

-

1.00 1.00

Ls Ls

-

-

140,855.00 26,092.00 9,592.00 38,957.60 47,207.60 34,342.00 26,092.00 50,842.00 2,500,000.00

0 0 0 0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

38,362.50 20,116.25 25,066.25 38,089.15 38,089.15 38,089.15

0 0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK TIDAK

500000 500000

0 0

TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG "C" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

NO

URAIAN PEKERJAAN

I II III IV V VI

PEKERJAAN PERSIAPAN, TANAH, PONDASI PEKERJAAN BATU / BETON PEKERJAAN KAYU / ATAP / PLAFOND PEKERJAAN INSTALASI LISTRIK PEKERJAAN FINISHING PEKERJAAN AKHIR TOTAL PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ………………………………

2.

3.

2. ………………

3. ………………………………

4.

5.

4. ………………

5. ………………………………

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

TETAP

Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO I 1. 2. 3. 4. II 1. 2. III. 1. 2. 3. IV 1 2 3 4 V 1 VI 1 2

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KANOPI "A" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN, TANAH, PONDASI Pasang Bowplank Galian tanah pondasi Urugan pasir dibawah pondasi Timbunan tanah kembali pondasi PEKERJAAN BATU / BETON DAN TIANG BESI HOLLOW Coor Pondasi, Sp. 1 :2:3 Memasang 1 m' Besi Hollow 4 x 4 cm PEKERJAAN ATAP SOKA JEMPOL Pas. Rangka Kanopi Besi Hollow 40.40 Pas. Gording Besi Hollow 40.40 Pas. Atap Kanopi (seng soka jempol warna biru) PEKERJAAN INSTALASI LISTRIK Pasang Intalasi Listrik Pasang Vetteng Lampu Pasang Saklar Ganda Pasang Lampu Philips XL 18 Watt PEKERJAAN FINISHING Mengecet Besi Hollow dengan cat minyak (setara gloteks) PEKERJAAN AKHIR Administrasi / Dokumentasi Pembersihan Akhir

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

20.00 5.03 0.45 1.26

M1 M3 M3 M3

2.26 55.12

M3 M1

34.13 M1 161.00 M1 117.99 M2 14.00 7.00 3.00 7.00

Bh BH Bh Bh

55.11

M2

1.00 1.00

Ls Ls

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

20.00 5.03 0.45 1.26

M1 M3 M3 M3

2.26 55.12

M3 M1

34.13 M1 161.00 M1 117.99 M2

-

14.00 7.00 3.00 7.00

Bh BH Bh Bh

-

55.11

M2

-

1.00 1.00

Ls Ls

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 240,240.00 24,750.00

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

795,217.50 399,927.51

0 0

TIDAK TIDAK

391,365.33 97,509.80 72,396.50

0 0 0

TIDAK TIDAK TIDAK

140,855.00 9,592.00 34,342.00 44,457.60

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

38,089.15

0

TIDAK

500,000.00 500,000.00

0 0

TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KANOPI "A" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

NO

URAIAN PEKERJAAN

I II III IV V VI

PEKERJAAN PERSIAPAN, TANAH, PONDASI PEKERJAAN BATU / BETON DAN TIANG BESI HOLL PEKERJAAN ATAP SOKA JEMPOL PEKERJAAN INSTALASI LISTRIK PEKERJAAN FINISHING PEKERJAAN AKHIR TOTAL PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ………………………………

2.

3.

2. ………………

3. ………………………………

4.

5.

4. ………………

5. ………………………………

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO I 1. 2. 3. 4. II 1. 2. III. 1. 2. 3. IV 1 2 3 4 V 1 VI 1 2

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KANOPI "B" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN, TANAH, PONDASI Pasang Bowplank Galian tanah pondasi Urugan pasir dibawah pondasi Timbunan tanah kembali pondasi PEKERJAAN BATU / BETON DAN TIANG BESI HOLLOW Coor Pondasi, Sp. 1 :2:3 Memasang 1 m' Besi Hollow 4 x 4 cm PEKERJAAN ATAP SOKA JEMPOL Pas. Rangka Kanopi Besi Hollow 40.40 Pas. Gording Besi Hollow 40.40 Pas. Atap Kanopi (seng soka jempol warna biru) PEKERJAAN INSTALASI LISTRIK Pasang Intalasi Listrik Pasang Vetteng Lampu Pasang Saklar Ganda Pasang Lampu Philips XL 18 Watt PEKERJAAN FINISHING Mengecet Besi Hollow dengan cat minyak (setara gloteks) PEKERJAAN AKHIR Administrasi / Dokumentasi Pembersihan Akhir

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

3.00 1.26 0.11 0.39

M1 M3 M3 M3

0.62 12.00

M3 M1

12.52 48.95 35.24

M1 M1 M2

4.00 2.00 1.00 2.00

Bh BH Bh Bh

16.85

M2

1.00 1.00

Ls Ls

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

3.00 1.26 0.11 0.39

M1 M3 M3 M3

0.62 12.00

M3 M1

12.52 48.95 35.24

M1 M1 M2

-

4.00 2.00 1.00 2.00

Bh BH Bh Bh

-

16.85

M2

-

1.00 1.00

Ls Ls

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 240,240.00 24,750.00

-

TIDAK TIDAK TIDAK TIDAK

795,217.50 399,927.51

-

TIDAK TIDAK

391,365.33 97,509.80 72,396.50

-

TIDAK TIDAK TIDAK

140,855.00 9,592.00 34,342.00 44,457.60

-

TIDAK TIDAK TIDAK TIDAK

38,089.15

-

TIDAK

500,000.00 500,000.00

-

TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KANOPI "B" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

NO

URAIAN PEKERJAAN

I II III IV V VI

PEKERJAAN PERSIAPAN, TANAH, PONDASI PEKERJAAN BATU / BETON DAN TIANG BESI HOLL PEKERJAAN ATAP SOKA JEMPOL PEKERJAAN INSTALASI LISTRIK PEKERJAAN FINISHING PEKERJAAN AKHIR TOTAL PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

-

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ………………………………

2.

3.

2. ………………

3. ………………………………

4.

5.

4. ………………

5. ………………………………

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO I 1. 2. 3. 4. II 1. 2. III. 1. 2. 3. IV 1 2 3 4 V 1 VI 1 2

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KANOPI "C" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN, TANAH, PONDASI Pasang Bowplank Galian tanah pondasi Urugan pasir dibawah pondasi Timbunan tanah kembali pondasi PEKERJAAN BATU / BETON DAN TIANG BESI HOLLOW Coor Pondasi, Sp. 1 :2:3 Memasang 1 m' Besi Hollow 4 x 4 cm PEKERJAAN ATAP SOKA JEMPOL Pas. Rangka Kanopi Besi Hollow 40.40 Pas. Gording Besi Hollow 40.40 Pas. Atap Kanopi (seng soka jempol warna biru) PEKERJAAN INSTALASI LISTRIK Pasang Intalasi Listrik Pasang Vetteng Lampu Pasang Saklar Ganda Pasang Lampu Philips XL 18 Watt PEKERJAAN FINISHING Mengecet Besi Hollow dengan cat minyak (setara gloteks) PEKERJAAN AKHIR Administrasi / Dokumentasi Pembersihan Akhir

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

3.00 1.26 0.11 0.39

M1 M3 M3 M3

0.62 12.00

M3 M1

12.52 48.95 35.24

M1 M1 M2

4.00 2.00 1.00 2.00

Bh BH Bh Bh

16.85

M2

1.00 1.00

Ls Ls

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

3.00 1.26 0.11 0.39

M1 M3 M3 M3

0.62 12.00

M3 M1

12.52 48.95 35.24

M1 M1 M2

-

4.00 2.00 1.00 2.00

Bh BH Bh Bh

-

16.85

M2

-

1.00 1.00

Ls Ls

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 240,240.00 24,750.00

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

795,217.50 399,927.51

0 0

TIDAK TIDAK

391,365.33 97,509.80 72,396.50

0 0 0

TIDAK TIDAK TIDAK

140,855.00 9,592.00 34,342.00 44,457.60

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

38,089.15

0

TIDAK

500,000.00 500,000.00

0 0

TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KANOPI "C" KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

NO

URAIAN PEKERJAAN

I II III IV V VI

PEKERJAAN PERSIAPAN, TANAH, PONDASI PEKERJAAN BATU / BETON DAN TIANG BESI HOLL PEKERJAAN ATAP SOKA JEMPOL PEKERJAAN INSTALASI LISTRIK PEKERJAAN FINISHING PEKERJAAN AKHIR TOTAL PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

-

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ………………………………

2.

3.

2. ………………

3. ………………………………

4.

5.

4. ………………

5. ………………………………

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

Lampiran Berita Acara Koreksi Aritmatik PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBUATAN BAK SAMPAH (3 UNIT) KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0

URAIAN PEKERJAAN

I PEKERJAAN TANAH / PASIR 1. Pasang Bowplank 2. Galian tanah 3. Urugan pasir dibawah pondasi 4. Urugan pasir dibawah lantai 5. Timbunan Tanah Kembali II PEKERJAAN BATU DAN BETON 1 Coor lantai. 1 : 3 : 5 2 Pasangan pondasi batu kali, Sp. 1 : 4 3 Pasangan batu bata, Sp. 1 : 5 4 Coor kolom praktis 12/12 cm (besi 238,385 Kg/M3+Bekisting 2 x Pakai) 5 Plesteran dinding, Sp. 1 : 5 6 Plester + Floor Lantai T = 20 mm, Sp. 1 : 3 7 Acian dinding dengan semen III. PEKERJAAN PINTU DAN PENGECETAN 1. Membuat pintu pelat baja tebal 2 mm rangkap, rangka baja siku 40.40 2. Pengecetan pintu besi 3. Pengecetan dinding

VOL

PENAWARAN PENYEDIA SATUAN SAT HARGA (Rp)

67.60 70.15 65.64 10.20 5.50

M1 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19

M3 M3

108.90 M1 18.00 Unit 0.31 M3

ARAN PENYEDIA JUMLAH HARGA (Rp) -

VOL

HASIL KOREKSI ARITMATIK SATUAN JUMLAH HARGA SAT HARGA (Rp) (Rp)

67.60 70.15 65.64 10.20 5.50

M1 M3 M3 M3 M3

16.50 55.73 368.24 10.28

M3 M3 M2 M3

4.13 2.19

M3 M3

108.90 M1 18.00 Unit 0.31 M3

-

-

HARGA SATUAN (HPS) (Rp)

PERSENTASE TIMPANG ATAU THD HPS TUDAK (%)

61,561.50 74,250.00 114,070.00 240,240.00 240,240.00

0 0 0 0 0

TIDAK TIDAK TIDAK TIDAK TIDAK

432,342.90 808,252.50 123,842.40 775,197.50

0 0 0 0

TIDAK TIDAK TIDAK TIDAK

4,924,025.16 6,654,227.21

0 0

TIDAK TIDAK

45,097.25 3,452,285.38 6,353,820.00

0 0 0

TIDAK TIDAK TIDAK

Lampiran Berita Acara Koreksi Aritmatik REKAPITULASI DAFTAR KUANTITAS DAN HARGA PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN PERUSAHAAN

NO I II III

: : : : : :

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBUATAN BAK SAMPAH (3 UNIT) KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN PENYEDIA JUMLAH HARGA (RP)

URAIAN PEKERJAAN PEKERJAAN TANAH / PASIR PEKERJAAN BATU DAN BETON PEKERJAAN PINTU DAN PENGECETAN TOTAL JUMLAH H PPN 10% JUMLAH SE DIBULATK

HASIL KOREKSI JUMLAH HARGA (RP) -

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ………………………………

2.

3.

2. ………………

3. ………………………………

4.

5.

4. ………………

5. ………………………………

HASIL KOREKSI JUMLAH HARGA (RP)

BERUBAH ATAU TETAP -

2. ………………………………

4. ………………………………

TETAP

LAMPIRAN BERITA ACARA KOREKSI REKAPITULASI TOTAL

PROGRAM KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN PERUSAHAAN

: : : : : :

NO

PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PEMBANGUNAN KIOS PEDAGANG, KANOPI DAN BAK SAMPAH KELURAHAN POYOWA KECIL KECAMATAN KOTAMOBAGU SELATAN 2015 0 PENAWARAN URAIAN PEKERJAAN

JUMLAH HARGA PEKERJAAN (Rp)

1

PEMBANGUNAN KIOS "A"

-

2

PEMBANGUNAN KIOS "B"

-

3

PEMBANGUNAN KIOS "C"

-

4

PEMBANGUNAN KANOPI "A"

-

5

PEMBANGUNAN KANOPI "B"

-

6

PEMBANGUNAN KANOPI "C"

-

7

PEMBANGUNAN BAK SAMPAH (3 UNIT)

-

Jumlah Harga Pekerjaan (sudah termasuk PPN 10%)

-

Kotamobagu, 25 September 2015

Kelompok Kerja (Pokja) II ULP Kota Kotamobagu 1.

1. ………………………………

2. 3.

2. ……………… 3. ………………………………

4.

5.

4. ………………

5. ………………………………

HASIL KOREKSI

BERUBAH ATAU TETAP

JUMLAH HARGA PEKERJAAN (Rp)

2. ………………………………

4. ………………………………

-

TETAP

-

TETAP

-

TETAP

-

TETAP

-

TETAP

-

TETAP

-

TETAP

-

TETAP

Related Documents

Koreksi Ulang0003
November 2019 13
Koreksi Kalium.doc
May 2020 7
Jurnal Koreksi
June 2020 7
Koreksi Mental
November 2019 5
Koreksi Ulang0002
November 2019 7

More Documents from ""