PROJECT: DATE : REF: SAFETY:

Work description

JOB SAFETY ANALYSIS ( J.S.A. )

HOT WORK

Those present Name

JOB SEQUENCE

Company

HAZARD/S

Cutting and Welding Burn, Injury It may be injured when cutting by broken disk wheel. It may be burn when cutting or welding near by the exist storage

Signed

CONTROL/S Safety guard must install/ only persons with professional certificate granted by competent authority are allowed to do the Works. Trained operators Must wear personnel protective equipment (PPE)

Damaged insulation on welding leads, electrode Check the equipment before use holders and connections. Providing fire extinguishers at the Faulty earth leads welding/ cutting area. Combustible material removed from the area.

PROJECT: DATE : REF: SAFETY:

Work description

JOB SAFETY ANALYSIS ( J.S.A. )

Excavation for water tank of supply building

Those present Name

JOB SEQUENCE 1. Plan Setup

Company

HAZARD/S Underground system

Signed

CONTROL/S Excavation permits must be obtained before digging Checking the technical infrastructure drawings of industrial Park, And other Works already built or installed by other contractors

2. Excavation

The drivers can not see everything. Excavator hit against person Land collapse Toxic gases, volatile gases

Driver’s license + medical certificate Providing a guiding man Markings for excavation areae Method statement Barricading and sign posting of all excavation work. Installing water pumps

Storm water flood

Providing with a ladder for access

Personal falling

All dirt must be piled at least meter back from edge of excavation

Gear rolling into water tank Exhausts and fumes of machinery heavier than air can fill the hole

Providing kick boards to prevent Chamfer digging

PROJECT: DATE : REF: SAFETY :

Work description

JOB SAFETY ANALYSIS ( J.S.A. ) Temporary electrical supply

Those present Name

JOB SEQUENCE

Company

HAZARD/S

The cranes, vehicles Installing/ Using strike against power line electrical equipment on site Serious injuries on site by electricity/ burn/ electrical shock

Signed

CONTROL/S Using the red sign, flag to warning There are no bare wires visible/ the cables is damaged, cut or worn Inspecting before starting work There are no taped or other defect joint in the cable The color insulation of the internal wires should be visible. There are no over heating or burn marks on the plug, cable equipment ELCB protection are working effectively The cable sheath is gripped where it enters the fug and the equipment

Coâng trình : Ngaøy thaøng : Soá :

PHAÂN TÍCH ATLÑ TRONG THI COÂNG ( J.S.A. ) ATLÑ :

Moâ taû coâng vieäc

Ñoå beâ toâng cho nhaø Warehouse

Thaønh phaàn tham döï Hoï vaø teân

Coâng ty

Trình töï coâng vieäc 1. Ñoå beâ toâng ñaøi coïc

Ruûi ro Saét chôø : Vaáp teù ngöôøi

Kyù teân

Bieän phaùp phoøng ngöøa An toaøn vieân nhaéc nhôû

Xieân voâ Ñaët baûng caûnh baùo : “ Khu vöïc nguy hieåm ñang thi coâng “ Daây caûnh baùo khu vöïc thi coâng. Saép xeáp goâng goïn theo moät phöông khoâng vöôn ra ngoaøi.

2. Choáng moái

Muøi gaây dò öùng, khoù chòu

Chæ nhöõng ngöôøi coù söùc khoûe toát, khoâng bò beänh thaàn kinh, hoâ haáp môùi ñöôïc laøm vieäc. Ngöôøi coâng nhaân laøm vieäc phaûi ñöôïc trang bò phöông tieän baûo veä caù nhaân : muõ, aùo, gaêng tay, khaåu trang. Thi coâng theo höôùng ngöôïc chieàu gioù. Thuoác phaûi ñeå trong kho.

Uoáng phaûi thuoác choáng moái

Thu doïn veä sinh saïch seõ caùc voû bao, raùc, thieát bò sau khi thi coâng xong, ñoùng kieän laïi ñeå xöû lyù . Coâng nhaân sau khi thi coâng xong phaûi taém röûa veä sinh saïch seõ. Coù saün thuoác xuùc röûa neáu coâng nhaân uoáng phaûi.

3. Ñaø kieàng

Chaùy noå : söû duïng

Kieåm tra thieát bò khi thi coâng.

PROJECT: DATE : REF: SAFETY:

Work description

JOB SAFETY ANALYSIS ( J.S.A. )

Concreting for slab of Warehouse

Those present Name

Company

JOB SEQUENCE 1. Concreting pile plug 2. Ground beam 3. Build formwork for slab, reinforcement 4. Concreting for slab

HAZARD/S

CONTROL/S

All protruding reinforcing steel, onto which an individual could fall, the hazard of impalement. Inadequate shoring, which can lead to formwork collapse Failure to guard the end of reinforcing steel. Uncomfortable smell

5. Termite Treatment

Signed

Allergic Suffocation due to lack of oxygen supply

6. Remove formwork

Only workers no allergic, diseases are allowed Only trained workers with knowledge in safe working method program, no sign of infections, neurology and respiratory diseases or any kind are allowed. Ventilation fan must be installed Always person out to alert, help

Hot

Wood table, ropes take victim out Washcloths clean sweat