Jaw Crusher 1 Limestone Loss (LJ1) 147.29 kg/hr Limestone (FL) 294,578.67 kg/hr Dp= 90 mm
Crushed Limestone (J1) 294,431.38 kg/hr Dp= 10 mm
Power Requirement Limestone size ranges from 10 to 200 mm but the average size of limestone feed in a jaw crusher is 90 mm. In the primary crushing stage, the feed is reduced to less than 20 mm for the next crushing stage which is milling (Alsop et.al, 2007). Bondβs crushing law was used to calculate the power requirement of the jaw crusher. π 1 1 = β100 Γ 10β3 ππ [ β ] π βπ·ππ βπ·ππ π = 294,578.67
ππ 1 π‘ππ π‘πππ Γ = 294.57867 βπ 1000 ππ βπ
π = β100 Γ 10β3 (12.74) [
1 β10
β
1 β90
π = 250.20 ππ
] Γ 294.57867
Blending Silo Sand (FS) 6,924.33 kg/hr Clay (FC) 45,008.17 kg/hr
Raw Mix (RM) 346,216.66 kg/hr
Fine Limestone (H1) 294,284.16 kg/hr
Power Requirement According to Alsop et. Al (2007), the power consumption of a blending silos to homogenize the raw mill is 0.5 kWh/ton. 0.5
ππβ 1 π‘ππ 346,216.66 ππ Γ Γ = 173.11 ππ π‘ππ 1000 ππ βπ π = 173.11 ππ
Blending Silo
PET Fines (H2) 1,157.41 kg/hr
Cement (B2) 230,324.07 kg/hr
Cement (CM) 231,481.48 kg/hr
Power Requirement According to Alsop et. Al (2007), the power consumption of a blending silos to homogenize the raw mill is 0.5 kWh/ton. 0.5
ππβ 1 π‘ππ 231,481.48 ππ Γ Γ = 115.74 ππ π‘ππ 1000 ππ βπ
π = 115.74 ππ
Alsop, P. A., Chen, H. & Tseng, H. (2007). The cement plant operations handbook. Surrey, UK: International Cement Review Limestone β Its processing and application in iron and steel industry. Retrieved March 2, 2019 from http://ispatguru.com/limestone-its-processing-and-application-in-iron-and-steel-industry/