Information System Design

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Information System Design as PDF for free.

More details

  • Words: 3,508
  • Pages: 40
 

2007   

 

 

TANGAIL SAREE KUTIR 

 

 

Information System Design Lab 

 

 

   

    Submitted To:  Mohammad

Ali (Associate Prof. Department of CSE, Ahsanullah University) 

Date of Submission: 9th August’2007   Works Done by:  

 

Nazmus Saquibe

      Nazmus

Sayeed

M Saroare jahan

(#04.01.04.098) (#04.01.04.053) (#04.01.04.009)

Md. Ashik Hossain (#03.01.04.041)

         

[ TANGAIL SAREE KUTIR]  143/1, New Baily Road Dhaka ‐1000 Bangladesh Phone‐ 8802‐8314567 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

   

 

 



Overview 



 

Working Area 



 

Organogram 



 

Designation 



 

guideline 



 

interview 



 

Questionnaire 



 

forms and documents 

12 

 

Existing system 

15 

 

Division of Unit 

16 

 

Service Charecter/Responsibility 

18 

 

DFD 

19 

 

Benefit analysis 

24 

 

Network layout 

28 

 

hardware specification 

32 

 

project scheduling 

36 

        [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 2 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

9 The Company we work along:    

   

Tangail  Saree  Kutir  is  the  first  chain  local  Saree  store  in  Bangladesh.  It  produces  scarves,  stoles  and  jewelry  along  with  its  cotton  and  silk  sarees  in  block  print,  batik,  nakhshikatha,  jamdani,  mirpur,  pabna,  rajshahi  and  tangail.  The  company  employs  more  than  5000  weavers  and  1000  hand  crafters to create magnificent handloom sarees as well as materials. Inspired  by  folklore  religious  stories  and  nature  of  rural  Bangladesh,  design  created  with dramatic sheer fluidity which gently showcases the body to make simply  elegant. Tangail saree Kutir has become one of the most famous share stores  of its kinds in Dhaka, Bangladesh to expose the exotic Beauty of Bangladesh  women in vibrant sarees.  Tangail Saree Kutir pioneered to recapture the glorious image of once famous  Dhakai Muslins and also regenerated the local sarees for popular use which  largely endangered during seventies.                [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 3 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    Tangail Saree Kutir is a large organization with more than 7000 employees. It has  huge amount of sales and inventories. As a result it needs a large and sophisticated  Information  System.  This  gives  us  a  great  opportunity  to  learn  about  the  Information System, its structure and function and implement what we have learnt  so far. By constructing there system, we can find out how to build and maintain a  large  and  sophisticated  Information  System,  which  will  help  us  in  the  future  in  building as such.   

    1. 2. 3. 4. 5.

Sales Department  Human Resource Management  Daily Transaction  Inventories  Annual Report       

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 4 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 5 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

     

        [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 6 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    N o 

Members 

Member’s Name 

Duration 

& Designation 

(min) 

Issue of the  Discussion 

Obtained Information 

(Scope of Work) 





Nazmus Saquibe (Team Leader)

30  

Financial  Management 

Get details Information  about financial  management including  sales, production, earnings,  expenditure etc. 

20 

Financial  Management 

Get details Information  about financial  management including  sales, production, earnings,  expenditure etc. 

30 

Human  Resource  Get details Information  about Human Resource  Management 

Nazmus Sayeed M Saroare jahan Md. Ashik Hossain   (Members)

  Mr. Shahin (Manager)

  2 



Nazmus Saquibe (Team Leader)

Nazmus Sayeed

 

(Member)

  Mr. Ismail (Store and Sales In charge)

  3 



Nazmus Saquibe (Team Leader)

Nazmus Sayeed Md. Ashik Hossain   (Members)

  Mr. Shahin

Management including  salary structure,  employment system,  Increment, Facilities etc. 

(Manager)

  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 7 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

   

    No 



Interviewee Name  and Designation 

Interviewer’s Name   & Designation 

Mr. Shahin

Nazmus Saquibe

Manager

(Team Leader)

 

Nazmus Sayeed M Saroare jahan Md. Ashik Hossain  

Scope of  Work 

Duration of  the Work 

Questionnaires  & Answers 

Human  Resource  Management 

45 Minutes 

Questions and  the answers are  included with the  document below. 

 

(Members)

 

  2 

Mr. Ismail

Nazmus Saquibe

Store and Sales In charge

(Team Leader)

 

Nazmus Sayeed M Saroare jahan Md. Ashik Hossain  

Financial  Management 

50 Minutes 

Questions and  the answers are  included with the  document below. 

 

(Members)

            [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 8 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

    Q.   No 

 

 

Questions 

Answers 

 



What do you buy for your company? 

Raw materials and produced goods. 



What raw materials do you buy? 

Cotton fabrics and sharees.  



From whom do you buy these  materials? 

Several textile industries and from the small  entrepreneur and also from the weavers. 



How do You pay for the materials? 

We pay after the materials after on hand by  cash. 



How many showrooms do you have? 

4 showrooms including the Baily road main  branch.  



How do you calculate the total  Each days transaction is calculated at the end  transaction of a day? Per showroom or  of the day at every showroom.  in a whole? 



How do you sell? Retail or wholesale? 

Both Retail and Wholesale. 



How do you keep track of sales and  inventory? 

Daily stock and monthly inventory. 



Is your Selling system Computerized? 

Yes but sparsely.  

10 

Do your outlets support any other  form of payment other than cash? 

Yes: Visa Card, Master Card, Citivisa, Brack  Card, Dutch Card. 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 9 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

11 

How do you manage cash and other  forms of payments? 

Initially keep at store but after a certain  period we keep it to the bank account. 

12 

How you calculate the selling price of  your goods over the costing? 

By gross calculation or sometime by  calculating some certain percentage. For  example if we expense 2000 for a sharee  including all the expenditure then we put a  price tag of 2500 Tk. Or sometimes we  calculate 10% to 15% profit on the  expenditure. 

13 

What are the ways of spending of your  Employee  salary,  Taxes,  Vat,  Utility  bills,  company?  Store fair, Outlet fair etc. 

14 

What amount/ percentage of money  you keep for your company for future  use? 

Confidential.  

15 

Is it possible to withdraw some  amount of money from the equity for  a director or a share holder? 

Confidential. 

16 

Do you have audit in your office?

Yes. Last in July 2006. 



What is the office hour? 

10 AM to 8 PM 



How many salary categories in your  office? 

Two categories. 



In which basis you employ the  employee. Permanent or Temporary? 

Both Permanent and temporary. Basically  temporary for the sales department. 



How the Part‐time employees get  their salary? Daily or after a month? 

Hour basis. But got their payments daily. 



How long a permanent or temporary  employee could be absent? 

By notifying the office 2 to 5 days. After a  week the temporary employee losses his job. 



What percentage will be cutoff after  the permanent employee miss offices 

Double of daily payment will be cutoff from 

 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 10 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

more then a certain period? 

the permanent employee’s salary. 



What will be the punishment for  delaying at office? 

For three consecutive working days delay he  will be get one day cutoff from his/her salary. 



Is there any bonus for the  temp/permanent employee? 

Not for the Temporary employee but for  others at the Eid time. 



Do you give increment after a  financial year? 

Yes. After every financial year. 

10 

Is there any loan for employees? If  Yes.  then what will be the interest system? 

11 

Is TA/DA present in your office? 

Yes. 

12 

Any scholarship / facilities for the  family members of a permanent  employee? 

No. 

13 

Does the employee get any percentage  Yes. But for the permanent employees only.  of shares after a financial year on  behalf of percentage? 

14 

Do the officers/ general employee get  any extra salary for the over time  duty? 

Not everybody. Those who have low salary  scale and the temporary employee get over  time.  

                [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 11 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

¾ Forms & Documents for Sales:      Scope of Work   Forms/  Documents 

  Source of  Origin       Sales Section  

        Selling System  Advance Sleep        Description:  Advance payment receipt.    Data:             Page No: 0196             

  Used by 

  Comments 

  Sales Section 

 

  Advance Receipt:   

    [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 12 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

¾ Forms & Documents for Invoice:      Scope of Work   Forms/  Documents 

  Source of  Origin       Sales Section  

  Used by 

  Comments 

            Selling System       Invoice  Sales Section        Description:  Commercial Invoice    Data:             Page No: 200707103972            Date: 11/07/2007                 Time: 1:10:44 PM             Pay Type: cash. 

  Commercial Invoice:   

     

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 13 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

¾ Forms & Documents for Attendance:        Scope of Work   Forms/  Documents 

  Source of  Origin      Management  

        HRM       Register        Description:  Attendance Register.    Data:  Month: June.              Year 2007. 

  Used by 

  Comments 

  Management 

 

 

¾ Forms & Documents for Attendance:        Scope of Work   Forms/  Documents          HRM  Form        Description:  Salary Statement.    Data:  Month: June.                Year: 2007. 

  Source of  Origin      Management  

  Used by 

  Comments 

  Management 

 

 

¾ Forms & Documents for Attendance:   

    Scope of Work   Forms/  Documents 

  Source of  Origin      Accounts  

  Used by 

  Comments 

            Financial  Register  Accounts  Management        Description:  Daily log of buying from a particular entrepreneur named Rabindranath Basak .    Data:  Month: June.                Year: 2007.  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 14 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

  

Introduction: Tangail  Saree  Kutir  is  the  first  chain  local  Saree  store  in  Bangladesh.  It  produces  scarves,  stoles  and  jewelry  along  with  its  cotton  and  silk  sarees  in  block  print,  batik,  nakhshikatha,  jamdani,  mirpur,  pabna,  rajshahi  and  tangail.  The  company  employs  more  than  5000  weavers  and  1000  hand  crafters to create magnificent handloom sarees as well as materials. Inspired  by  folklore  religious  stories  and  nature  of  rural  Bangladesh,  design  created  with dramatic sheer fluidity which gently showcases the body to make simply  elegant. Tangail saree Kutir has become one of the most famous share stores  of its kinds in Dhaka, Bangladesh to expose the exotic Beauty of Bangladesh  women in vibrant sarees.  Tangail Saree Kutir pioneered to recapture the glorious image of once famous  Dhakai Muslins and also regenerated the local sarees for popular use which  largely endangered during seventies.                [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 15 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

  Tangail Saree Kutir has a well balanced division unit. This is given bellow: 

                               

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 16 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 17 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

  Designations

Responsibilities 9 Observe the total Service Admin

Administration:          CEO           Directors           Manager 

9 Keep the store tracks. 

Store:          Store Keeper 

  9 Buy the products and raw materials.

Purchase:          Record keeper 

 

IT:

9 Give technical support 

         Coordinator IT 

9 Maintenance the requirement  supply 

Accounts

9 Observe the total account section 

         Assistant Accountant 

9 Calculate the Account side 

9 Make a combination to the finance.  Sales Center

9 Sales Sarees and other Products

         Counter In Charge    [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 18 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

   

  ™ ™ ™ ™ ™ ™

Scope No.                                 01  Scope of Work                        About us   Process  Description of Tangail Saree Kutir Limited  Flow  About Sales & Service   Data Store About us  Terminator Output (About  us Allocation of     ƒ

™ Data flow Diagram(DFD)

Business/Organogram/Tangail Saree Kutir Directors  /Key  Persons  Figure 1 

External Data Store User 

About Tangail Saree Kutir

(Admin) 

 

Process the Request

Descriptions  of Sales &  Service 

Requesting 

.

about US

Request to Database

User 

                  Output   (About us Allocation of Business / Organogram /  Tangail Saree Kutir Directors /Key Persons 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 19 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    ™ ™ ™ ™ ™ ™ ™

Scope No.                                 02  Scope of Work                        Buying Raw Materials  Process  Input/ System of Buying  Flow  Purchase  Data Store Purchase  Terminator Output (About  Purchase methods/products)  Data flow Diagram(DFD) Figure 2 

External Data Store Admin 

 

About Purchase Products

Process the Request

Descriptions  of Products  and sellers 

Requesting 

.………….

Purchase

Request to Database

Admin 

                  Output   About purchase methods / products. 

        [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 20 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    ™ Scope No.                                 03  ™ Scope of Work                        Selling Products   Input / System of Selling Process  ™ Process ™ Flow  Selling  ™ Data Store Tangail Saree Kutir  ™ Terminator Output (About  Selling Transition)  ™ Data flow Diagram(DFD) Figure 3 

External Data Store Counter In  Charge 

Admin 

About Selling System

Process the Request

Different kind  of product  Price 

_____________

Requesting 

Request to Database

Tangail Saree Kutir

View 

                  Output   About sales Transaction. 

        [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 21 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    ™ Scope No.                                 04  ™ Scope of Work                        Attendance   Submit Request  ™ Process ™ Flow  Attendance  ™ Data Store Tangail Saree Kutir  ™ Terminator Output (Attendance of Employee)  ™ Data flow Diagram(DFD) Figure 4 

External Data Store Employee 

 

About Daily Attendance

Process the Request

Daily  Attendance of  Employees 

Requesting 

_______

Tangail Saree Kutir

Request to Database

Admin 

                  Output   Attendance of Employee. 

        [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 22 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    ™ Scope No.                                 05  ™ Scope of Work                        Salary   Submit Request  ™ Process ™ Flow  Salary  ™ Data Store Tangail Saree Kutir  ™ Terminator Output (Salary of Employees)  ™ Data flow Diagram(DFD) Figure 5 

External Data Store Admin 

 

About Salary System

Process the Request

Salary of  Employees 

Requesting 

________

Tangail Saree Kutir

Request to Database

Admin 

                  Output   Salary of Employee. 

        [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 23 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

 

Benefit  means  total  profit  of  an  organization.  By  deducting  total  expenditure  from  the  total  income  for  a  certain  period  we  get  the  benefit  of  any  company.  There  is  a  difference  between  expenditure  and  investment.  Building  a  computer  based  system  in  an  investment.  Costs  are  incurred  throughout  its  life  cycle.  Benefits  are  realized  in  the  form  of  reduced  operating  costs,  improved  corporate  image, staff efficiency or revenues.   The benefit are of two types:   • Tangible benefit  • Intangible benefit.   

   

Field Of savings

Benefit in BDT (conjecture)

Less papers 

10000 

Less pens 

2500 

No locker 

30000 

Extra software Buying 

5000 

Other equipment for filing (i.e.: files, pin etc)

3000 

  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 24 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

  9 Automated system has more accuracy and speed. So can give services to the customers more  accurately and fast.  9 Automated system is more secured then a manual system and it has kind automation processes.  So decision making is further more easy then manual process.  9 By using an automation process a director can easily get the daily report without any hassle.   9 Surely automated system can bring customer satisfaction. As a result improvement in company  image can functional in business.  9 Automated system can be fitted in a small place, which can be cost effective. 

 

  Item

Quantity

Cost (BDT)

Operating System (XP) 

8

34000/=

Computer (Celeron)

8

320000/=

Printer 

3

12600/=

UPS 

9

32000/=

Network 

30000/=

Server PC 

1

50000/=

Radio Link(setup) 

4

80000/=

 

  Total 

_____________________ 558600/=

  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 25 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

Cost 1

st

year Item

Quantity

Cost (BDT)

Server 

1

50000

Computer 

5

150000

Printer 

1

4200 

Accessories 

3000 

Network 

10000

Total 

217200/=

 

Running cost 1  

 

 

st

year  

Item

Quantity

Paper 

Cost (BDT) 3000 

Toner 

5

4000 

Operator Salary 

3

15000

Administrative Overhead 

5000 

Office Rent 

200000

Accessories 

5000 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 26 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

Total 

234000

 

Income 1

 

st

year

 

 

Income 2

nd

 

 

Income 3

Income (BDT)

Service 

200000 

Contract 

150000 

Total 

35000 

 

 

year

  rd

Field

Field

Income (BDT)

Service 

250000 

Contract 

260000 

Total 

510000 

 

year Field

Income (BDT)

Service 

260000 

Contract 

280000 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 27 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

Total 

 

 

Income 4

 

  th

 

 

785000 

 

 

 

year

 

Field

Income (BDT)

Service 

265000 

Contract 

285000 

Total 

550000 

 

 

 

Rate of Return: 14% NPV=  = ‐558600‐(217200/1+.14)+((35000‐23400)/(1.14)^1)+((51000‐234000)/(1.14)^2)+((540000‐ 234000)/(1.14)^3)+((555000‐234000)/(1.14)^4) 

= 134249            [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 28 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 29 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

  Counter 1: First Floor  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 30 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

    Manager room    primary store   Office room   Road   Entrance car parking counter01  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 31 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

            ROOF 

  Main Store                              Server Room  [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 32 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

Desktop computer specification: Item

Specification

Unit

Brand / Model 

Clone 

8

Processor & Speed  

Intel Celeron , with clock speed of 2.8 GHz

 

Motherboard 

Intel 865 GV Chipset

 

Bus Architecture 

PCI 

 

Cache Memory 

256 KB L2 Cache (Integrated with processor)

 

Ram 

512 MB DDR2 Ram with expandability

 

Hard Disk Drive 

80 GB SATA, 7200 rpm

 

Floppy Disk Drive 

1.44 MB 3.5” Floppy Disk Drive

 

Multimedia 

16 x DVD ROM Drive

 

Sound Card 

Integrated 3D Audio

 

Graphics 

Integrated Intel Extreme Graphics 

 

I / O Port 

6 USB , 2 Serial , 1 Parallel Port

 

Monitor 

Samsung 15” CRT Color monitor , Resolution 1024 x 768 

 

Key Bored /Mouse 

PS2 Keyboard/ Optical Scroll

 

Form Factor / Casing 

ATX Casing 

 

Network Card 

Built in 10/100 MB\s

 

Warranty 

1 years full warranty

 

30000/= Taka Each.

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 33 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

Server computer specification: Item

Specification

Unit

Brand 

Clone



Processor 

Intel Core 2 Duo 2.4 GHz

 

Motherboard 

Intel 965

 

Cache / Chipset 

2MB  L2 cache

 

Ram 

2 GB (2*1GB) DDR 2

 

Hard Drives 

160 GB SATA

 

CD – R / W Drive 

ASUS 48*24*48 X

 

Monitor 

Dell 17” LCD

 

Video Sub System 

Integrated ATI‐ Radeon 256MB

 

I / O Slot 

Total 3 PCI Slot

 

Keyboard / Mouse 

PS2/Optical Mouse

 

Network card 

Built IN 10/100MB

 

Operating System 

Linux

 

Warranty 

1 Year Limited warranty

 

50000/= Taka            [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 34 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

Printer specification: Items

Specification

Unit

Brand 

Canon



Model 

Canon Pixma iP1200

 

Image Ret 

1200 dpi  for high quality documents (Image Rat)

 

Resolution 

600 * 600 dpi

 

Speed 

17 pages per minute in black (letter)

 

Interface 

USB 2.0 port 

 

Media types 

Plain Paper , envelops , transparencies (gray scale  only), card stock , postcards and labels 

 

Media Sizes 

A4 , letter , Legal , Executive , no. 10 envelops

 

No . of Toner 

2  Black & Color ( Cyan , Yellow , magenta)

 

Microsoft Windows 98 , 2000, me & XP (32‐bit), Supported O/S 

  Apple Macintosh 9.x and OS X, Linux 

Warranty 

1‐ years parts & service

 

4200 /= Taka.              [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 35 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

  Possible Network diagram (schematic diagram)  

          [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 36 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

 

   

Number

Scheduling Topics

Dependencies

(weeks)



User Requirement







Feasibility Study

A





Prioritize the Requirement

A





Analysis the System

B,C





Specification

D





Software Design

E





Hardware Study

E





Coding

F





Hardware Procurement

G





LAN Establishment

I





Deployment

H,J





Maintenance

K



 

Total Weeks needed: 28           [Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 37 

[ TANGAIL SAREE KUTIR]  May  31, 2007     

 

After plotting the Gannt Chart the process can be done within 22 weeks.

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 38 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

1

Earliest: 0‐4‐4 

Earliest: 4‐2‐6 

Latest: 0‐4‐4 

Latest: 4‐2‐6 

2

Earliest: 6‐4‐ 10 

3

Earliest: 10‐2‐12 

Earliest: 12‐4‐16 

Latest: 10‐2‐12 

Latest: 12 4 16 

5

6

7

Earliest: 13‐1‐14 

Earliest: 16‐5‐21 

Latest: 15‐1‐16 

Latest: 16‐5‐21 

Earliest: 4‐1‐5  Earliest: 5‐0‐5  Latest: 5‐1‐6  Latest: 6‐0‐6 

4

9

8 Earliest: 14‐3‐17  Earliest: 21‐3‐23  Latest: 16‐3‐19  Latest: 21‐3‐23 

10

12

Earliest: 17‐2‐19  Earliest: 23‐4‐27 

Latest: 19‐2‐21 

Latest: 23‐4‐27 

11

13 Earliest: 19‐0‐19  Latest: 21‐0‐21 

 

   

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 39 

[ TANGAIL SAREE KUTIR]  May  31, 2007   

Slack Time:    Latest starting time – Earliest starting time OR Latest Finishing time – Earliest Finishing time  

User Requirement     Feasibility Study     Prioritize the Requirement  Analysis the System     Specification       Software Design     Hardware Study     Coding       Hardware Procurement   LAN Establishment     Deployment       Maintenance       

: 0  : 0  : 1  : 0  : 0  : 0  : 2  : 0  : 2  : 2  : 0  : 0 

The Critical Path is displayed by the thick black lines.  

 

[Department Of CSE, Ahsanullah University Of Science And Technology]   

Page 40 

Related Documents