BEYOND
BUSINESS
PERFORMANCE.
TOGETHER
PM Configurable Material BOM for Equipment Pilotage de la performance | KP Consulting www.kpconsulting.fr/ KP Consulting propose son expertise autour des solutions de pilotage de la performance et de l'optimisation de l'efficacité des organisations. Mickaël QUESNOT
BUSINESS INTELLIGENCE • PERFORMANCE MANAGEMENT • DATA WAREHOUSE • MOBILIT Y CUSTOMER INFORMATION MANAGEMENT • INTEGRATION • MASTER DATA MANAGEMEN T
PM Configurable Material BOM for Equipment Welcome, KP Consulting provides solutions to problems that you encounter along your projects. Let's not forget that the information is appreciated as it is shared. This presentation demonstrates the use of the variant configuration to create a configurable material with rules (object dependencies) to define the configurable BOM for the equipment. • Make sure that the material BOM header basic data 2 view is set as configurable material. • •
MM60 - Materials List MM02 – Change (Change material)
• You create the material BOM as usual with its spare parts, the configurable BOM would contains all the spare parts for the 3 models. In our example here, Z100A material is a common material/spare for all models. • •
CS01 – Create (Create material BOM) CS03 – Display (Display material BOM)
• You need to create a characteristic, in this case we use it to represent the equipment model. •
CT04 – Characteristics
• Then you create a class with class type (300) which is a variant class, assign it with the characteristics. •
CL02 - Classes
SAP & SuccessFactors Services Framework Contract - KPC Proposal
2
PM Configurable Material BOM for Equipment
•
•
•
Use the configuration profile to assign the variant class to the configurable material. •
CU41 - Create
•
CU43 - Display
Create the OD (object dependency) to select the spare parts based on model. Example, SEL_IF_MODEL_1 •
CU01 - Create
•
CU03 - Display
Now assign the OD SEL_IF_MODEL_1 to material Z100B in the BOM •
•
•
Now, you assign the configurable material BOM header as the construction type in the technical object Z100 in this case •
IE01 - Create (General)
•
IE02 - Change
You also need to switch on the Configuration data in the technical object to assign the configurable material BOM header here. •
•
CS02 - Change
IE02 - Change
In the same folder, assign the characteristic value (which in this case is referring to the model of the equipment). Assuming Equipment Z100 is of model 1 which needs spare parts Z100A and Z100B.
•
IE02 - Change
SAP & SuccessFactors Services Framework Contract - KPC Proposal
3
PM Configurable Material BOM for Equipment
• Lets simulate the results by creating an Maintenance Order for the equipment Z100.
• Lets check the spare parts selection influenced by the OD rules. • Notice, only material A and B ready for selection. •
IW31 - Create (General)
• We now create anthoner equipment Z200. • Lets simulate the results by creating an MO for the equipment Z200. • For Equipment Z200, lets check how the OD rules influence the spare parts selection. • Notice, only material A and C ready for the selection. •
IW31 - Create (General)
SAP & SuccessFactors Services Framework Contract - KPC Proposal
4
SAP & SuccessFactors Services Framework Contract - KPC Proposal
5
SAP & SuccessFactors Services Framework Contract - KPC Proposal
6
Material
SAP & SuccessFactors Services Framework Contract - KPC Proposal
7
BOM
SAP & SuccessFactors Services Framework Contract - KPC Proposal
8
Characteristics
SAP & SuccessFactors Services Framework Contract - KPC Proposal
9
Classes
SAP & SuccessFactors Services Framework Contract - KPC Proposal
10
Configuration Profile
SAP & SuccessFactors Services Framework Contract - KPC Proposal
11
Single Dependency
SAP & SuccessFactors Services Framework Contract - KPC Proposal
12
Single Dependency
SAP & SuccessFactors Services Framework Contract - KPC Proposal
13
Material BOM / Single Dependency
SAP & SuccessFactors Services Framework Contract - KPC Proposal
14
Material BOM / Single Dependency
SAP & SuccessFactors Services Framework Contract - KPC Proposal
15
Equipment
SAP & SuccessFactors Services Framework Contract - KPC Proposal
16
Equipment
SAP & SuccessFactors Services Framework Contract - KPC Proposal
17
Equipment
SAP & SuccessFactors Services Framework Contract - KPC Proposal
18
Maintenance Processing
SAP & SuccessFactors Services Framework Contract - KPC Proposal
19
Maintenance Processing
SAP & SuccessFactors Services Framework Contract - KPC Proposal
20