Guide Book Videotron.pdf

  • Uploaded by: Made Utari Dewi
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Guide Book Videotron.pdf as PDF for free.

More details

  • Words: 5,864
  • Pages: 34
User Manual

LED display USER MANUAL

Manual

Content

Ⅰ. Safety Information WARNING : Please read and observe all the safety matters and attentions in this manual carefully before application.   

   



   

 

Don’t jam the air vents. Please install as the manufacturer’s instruction. Don’t install the product close to heat sources like radiators, heaters, stoves or other equipment that can produce heat (including amplifiers). Don’t tread power and data lines; especially avoid squeezing plugs, outlets and power/data lines led from equipment. Replace damaged power and data cables immediately. Only the company designated accessories and fittings can be used. Please cut off the power or provide other applicable lightning protection in case of thunders. Please cut off the power without using the product for a long time. Please put the distribution box close to the product in order to easily cut off the main power if there in case any problem. The product shall be installed and maintained by qualified technician. Please contact professional maintenance personnel to repair the product damaged due to various reasons (such as the power or plug broken down, the equipment work failure or falling down). Use the product by combining with the manufacturer designated or equipment accessory system or the peripheral equipment. Be sure to be careful to uplift, move or transport the product, avoiding damage of product from falling down and injury of people. Owing to improper operations, the product may give rise to electric shock, fire or falling down and cause serious damage or death. The input voltage of the product is divided into AC 100-120V/110-220V/100-240V 50/60Hz in accordance with different areas. Please ensure cutting off the main control switch of input power of the whole display when installing the product and wiring. Please be sure to have sound grounding. Please do not provide the product output power terminals for other equipment. Please be careful to check if any trouble in the power line / joint and terminal blocks before power on. Please do not use any damaged or bare power lines or power plugs. In order to avoid the shock hazard, please don’t dismantle the front cover (or rear cover). 1

Manual  Ensure at least 30cm space for the rear radiator to radiate. Please do not directly place or paste any articles in the surface of LED.   



  

Please do not use the product if the environment temperature is above 50℃. As the product will generate heats, please put the product far away from inflammable and explosives. Ensure adequate ventilation during installing for safe running of the product. In order to avoid causing fire due to the overloaded power cables, please properly allocate the load of power cables according to this user manual or use cables configured by the supplier. Pay attention to the hoist loading; installation with hoist must be strictly according with the load limit. Please wear helmets during construction to avoid causing personal injury. Please fasten the seat-belts during the aloft work.

2

Manual

II. Product Introduction 1) LED screen dimension

2) Features  Ultra thin and lightweight cabinet.  Various cabinet sizes can be available for different installation environment.  Beautiful and neat cabinet internal wiring.

3

Manual 3) Cabinet 1 LED module

2 Cabinet 1÷

10 2

3

9

55÷ 4÷



7 8

4

• 

Manual

1、Signal out 2/4、Door key 3、Cabinet handle 5/6、Power /Signal cable out 7、Power in(220V) 8、Signal in(first cabinet) 9、Screw hole- for fixing cabinet connector 10、Cabinet locating plunger

4)Wire rod

Name: Main power cable of LED screen/ Cascaded power cables between cabinets Specification: 3*4mm2 multi-strand copper core (brown, blue, yellow/green) Length: 5m/10m/15m Color: black

5

Manual Name: Main signal cable from sending card to cabinet/ Cascaded signal cable between cabinets Specification:  UTP Ethernet cable, wire core 24AWG  Ethernet cable, UTP 8P shielded Ethernet cable, single cable with single core double-shielded Ethernet cable 8 strands multi-core, Gigabit Ethernet UTP cable Length: 5m/10m/15m Color: blue

6

Manual

5)Installation 1 Installation Tools and accessories

M10*20mm screw—fixing Ushape connector for hanging beam

M10*25mm screw—for fixing cabinets in vertical installation and hanging installation

M10*65mm screw—For fixing cabinets in vertical installation

U-shape shackle—Accessory for hanging installation

S2.5、S6、S8 Allen wrench—for dismantling modules and screwing

Cross screwdriver

Digital multimeter—measuring power cord

Door key

M10 Allen wrench 一 for fixing M10*25mm screws on cabinet

7

2 Installation Method Two installation ways for AD series: vertical installation and hanging installation.

a.

Vertical installation procedure

 Make steel structure with 40mm*40mm square tube according to cabinet dimension.  Put cabinet right side up on the support rods of lowest layer.

Two-hole curved connector

M10*25 mm hexagon screw

 Hang two-hole curved connector on tube and make the screw hole match the holes on cabinet side.

 Use M10*20mm hexagon screw to fix connector on cabinet.

 Make the second cabinet close to the first one, use M10*25mm screws to fix square connector between two cabinets.

 When install the second row of cabinet, make locating plunger of the cabinets at lower layer insert in alignment holes at the bottom of second row cabinet. Using connector to fasten adjacent cabinets.

 Connector: a. Use M10 * 25mm screws and two-hole curved connector to install the cabinets on both sides of steel frame. b. All cabinets close to steel tube should be connected with M10 * 65mm screws and four-hole or two-hole connector.

Warning:  Please be sure to handle with care when installing, protect LED screen from strongly impact.  Take necessary safety steps in middle of installation, in case causing personal and property damages.  For vertical installation, the maximum cabinet number in height is less than 15pcs.  For hanging installation, the maximum cabinet number in height is less than 10pcs.

6)LED Screen Control System 1 Control card 1. Sending card——Installed in computer, external sending box or video processor to transmit data to LED screen. Nova

2. Receiving card——Installed in every cabinet to receive data from sending card and transmit it to LED screen.

3. HUB——Installed on receiving card and transmit data to every module of LED screen.

4. LED video processor

2 Control card wire rod

USB cable

USB to RS232 cable

DVI cable

DVI shunt cable

DVI cable

HDMI to DVI cable

VGA cable

DVI to VGA cable

Warning: Must cut off power before doing the following operations! 3 Control system installation a.

Sending card: Open host and following the next steps to install sending card(or install to inside of LED video processor ). Discrete graphics

PCI slot Insert sending card into PCI slot

Screwdriver

Fix sending card into host

b. Control system wiring  Connection diagram of internal sending card:

VGA or DVI cable

Sending card

Audio output Monitor

USB Cable

U D

Graphics card DVI cable

Ethernet cable

host



LED screen

LED screen wiring

a. LED screen wiring diagram

 Signal cables between cabinets in series, using network cable connect output port of sending card and any corner cabinet of screen, and then start with this cabinet, connecting every cabinet in series by signal cables. The following two connections way can be reference.

Z-mode connection

Sending card signal output

 Power cables between cables in series, using power cable connect power distribution and any corner cabinet of LED display, each row or column in series with one power cable. Power distribution

Cascade connection from bottom to top

Warning:  In order to prevent the occurrence of fires and insufficient power supply, the cabinet number of each way main power lines horizontally or vertically in series should be less than 12pcs, can be calculated based on power consumption and power cables of single cabinet.  Before turning on the power, it is strongly recommended to use a digital multimeter diode test the power line, make sure the power cord is breakover, and there is no short-circuit between the phase conductor, zero line and ground wire, the last step is turning the power on.



LED screen parameter setting

Nova control system  Open “receiving card” interface

 Click “load from files” and find the folder saving screen parameter file.

 Find screen parameter file (.rcfg) in the folder.

 Click “open” and load parameter file to control software.

 Send parameter file to each receiving card.

 Save parameter file in receiving card to ensure file would not lose from power-off.

 Open “display connection” interface.

 Insert numbers of receiving card in width and height (that is cabinet number).  From screen front side, if the left corner cabinet of screen is the first cabinet signal in, then start setting with the lower left corner box of control software.

 A) According to the port 1 or port 2 main signal cable insert, choose matched access in software.

 B) Insert resolution of a single cabinet (Pixels in width and height) C) Click all boxes from first to last. D、E) Sending parameter to receiving card and save it. F) Save the screen config file (.scr) to computer, then you can load the file directly next time.

 C

A B

 F E

D

7)Power distribution 1 Function of power distribution 1

2

3

Name Power distribution

4

L 7

6

5 K

1 2 3 4 5 6 7

Function Output power 60KW three-phase power light indicator Light indicator of 220V power Manual off/on Manual mode / off / Automatic mode Lock

7

2 Power distribution connection 1

2 34

5

8 7

Name

Specification

Model

1 2 3 4 5 6

N1 L1 L2 L3 G1

three-phase power wiring

220 power out

7

Multi-function card

Connect with sending card

8

CAT 5 signal port

Connect with screen

Connect with screen

6

Warning:  In order to avoid leakage causing damage of personal and property, ensure turning all the power off when connecting the power distribution.  To ensure that the internal power supply of LED display would not have a strong impact and cause damage to the power supply, please turn the power switch on progressively from power distribution box when turning on LED display

8)Packing and transportation Advantage:  shockproof, better protection for LED screen. Beautiful package and easy to transport, more convenient for rental use screen.

EPE + Ply-wooden case Name: ply-wooden case specification: 3 in one case dimension: depends on cabinets size

9) LED screen common failure and solution Fault phenomen on

Fault reason

Solution

1、Screen has no power 2、Communication transmission cables are not connected well

Black display

3、The graphics card of computer is not well setted. 4、LED display is turned off by control software 5、Damaged control system 6、Damaged receiving card 7、The control system doesn’t load screen parameter.

Display disorder

The control system can’t be found when starting on control software

Screen flicker

1、Power the screen properly. 2、Check whether DVI, Ethernet cable and other communication cables are well connected or not. 3、Set computer graphics card to copy or expansion mode. 4、Change control software statue to screen on. 5、Check out if control system installed well or not, working status is green lamp flicking and red lamp on. If sending card is damaged or there is no signal, green lamp will be on or dark, in that situation you have to change control card. 6、Check if receiving card been powered well or not (Red light keep on), signal transmission is ok or not (green light blanking). 7、Open control software and load screen parameter, and sending it receiving card and save it.

1、Incorrect screen parameter

1、Please check out whether the screen parameter been loaded is right or not. Connect us if parameter is missing

2、Incorrect setting of graphics card or screen resolution

2、Reset the resolution of graphics card and control system(Remark: restart the computer after modifying resolution of control system, or cut off the power and restart external sending box.)

1、Unconnected signal cable between COM port and output of sending card.

1、Connect the data cable well. 2、Replace computer or USB cable.

2、The COM port or USB of computer is broken. 1、Loose module flat cable 2、DVI cable is not well inserted.

1、Re-insert the module cables. 2、Insert DVI and fix it with screws.

Display content mismatch or repeat

Single cabinet can’t be lighted

1、Incorrect screen parameter 2、Connection error of signal cables between cabinets.

1、Damaged power supply 2、Damaged receiving card

1、Reset screen parameter according to screen connection way and save it. 2、Check whether the signal cable between cabinets is well connected or not, and if there is dislocated connection or not.

1、Check if cabinet is powered or not. 2、Check if receiving card is powered or not (Red light keeps on), signal transmission is well or not (green light is blanking). If red light keeps on or is dark, please replace receiving card.

1、Unnormal power of screen 2、Loose module flat cable Single module can’t be lighted

3、The input flat cable of the module is damaged. 4、Signal receiving IC of the module is damaged.

1、Check whether the power voltage of the module is OK or not. 2、Re-insert the loose flat cable. 3、Replace the input flat cable of the module. 4、Replace the module. 5、Replace the previous module.

5、Previous module has no signal output.

Color lack of module

Some LED lamps are not lighted and lack of color

1、Loose module flat cable 2、Damaged input module flat cable

1、LED lamp is broken or lamp legs is lack of solder or short circuit 2、The IC controlling the lamp is broken.

1、Re-insert the loose flat cable. 2、Replace the input flat cable of the module.

1、Use soldering iron to solder the pins of lamp or IC pins controlling the lamp, change LED lamp directly. 2、Replace IC.

1、Incorrect setting of graphics card Screen is out of control

2、The USB of control card is not inserted or diving software is not installed 3、Cabinet or module fault

1、Check whether graphics card setting is right or not. 2、Check whether USB cable is well connected or not, and USB driving software is installed well or not. 3、Check whether there is fault module or not.

10) Routine maintenance of LED screen The large LED screen is like traditional electronic products which need to be paid attention to use methods and maintenance, so as to make a longer service life of it.

1 Routine maintenance of PC Routine maintenance of main control computer The computer is usually placed in the control room, thus to keep the stability and good displaying result, we must maintain the main control computer regularly as follows: 1、Clean Keep the control room clean and regularly dedust the computer and surrounding equipment, as dust may contaminate the keyboard, disc, display, host circuit board and other important parts, causing material faults. 2. Ventilation The computer will produce a lot of heat during operation. If radiating is not sufficient and the room temperature is too high, computer crash and other faults may be easily caused and the service life of the main control computer may be reduced in a long term. Therefore, ventilation must draw enough attention. 3. Temperature and relative humidity If the environmental temperature is relatively high (e.g. in hot summer), the control room must be installed with fans or air condition equipment if applicable, so as to maintain the temperature as 10℃ ~ 35℃ and the relative humidity 30%-80%, and try to avoid working of computer under high temperature and high humidity. 4. Hardware examination Regularly examine the hardware and surrounding accessory equipment of the computer, e.g. whether or not the graphics card and sending card is loosened, whether or not DVI line, serial port line or USB line is loosened or damaged, and eliminate discovered problems in time. 5. Software upgrading Kill virus regularly, especially that the computers connecting internet shall be installed with anti-virus software. And the player software shall be upgraded regularly to assure the latest version is used. 6. Points for attention: The more stable computer power is the better. Usually it is required to use AC 220 V±10% with frequency of 50HZ±5%. A fluctuate power can affect the normal running of computer and directly affect the regular displaying of display, thus it is suggested to add one UPS, if possible, which will protect the computer data from missing due to sudden blackout of main supply and also has voltage stabilization function generally. If there’re refrigerators or air conditioners of high-power surrounding the computer, the power socket of the computer shall be separated with theirs and use independent power socket. As safety assurance, the computer power shall have good grounding system with three-phase power socket of null line on the left, live wire on the right and ground wire on the top. The ground wire here is the safety wire of power, which shouldn’t be connected with the logical ground line of the computer.

2 Routine maintenance of LED screen (I) Cabinet part 1. The examination of cabinet part mainly includes the following procedures: Examine whether or not the power works normally and whether or not AC wire is loosened. Examine whether or not the fan works normally, and dedust the fan blade. Examine the receiving card: Check whether or not the supplying DCSV wire is loosened and whether or not the receiving card and keyset are well contacted as well as whether or not the winding displacement of keyset is loosened, Visually examine whether or not the DCSV wires and winding displacements between the internal modules of the cabinet are loosened. Examine whether or not there are sundries jamming the air-vent, and dismantle the anti-dust net to clear off if so. 2. Others Examine finishing of the display to assure safety usage of it. The maintenance passage ladder of display shall be at least three meters and be additionally installed with protective door and relevant warning boards. (II) Display part

For the display part, mainly conduct regular dedusting on the surface of display especially for out-door display which is long-time exposed to the work environment of wind, sun and dust and can be easily contaminated. Thus, regular dedusting of display can not only elevate displaying effect but also avoid the acid particles and other chemical substances in the out-door environment to corrode the surface of display under humid condition, so as to improve the service life of display. For out-door display, install efficient lightning-protection equipment if necessary. The following issues shall be noted for application and maintenance of LED: 1. It is required to have stable power supply and good grounding protection. 2. Don’t use under bad weather, e.g. strong thunder. 3. Water and iron powders and other conductive metals are forbidden to enter into the display body. LED display shall be placed in low dust environment, as large dusts may affect the displaying results and too much dusts will damage the circuits. 4. In case of water entering due to any reason, please switch off and contact the maintenance staff. The display shall not be used until the internal display board is dried. Maintain the humidity of the use environment of full-color LED and do not let any item of humid nature to enter into the display. Powering on the full-color LED with humidity can result in corrosion of parts, thus causing permanent damages. 5. The start and close sequence of LED: A. First start the control computer to make it work normally, then start the LED. B. First close the LED, then computer. 6. LED surface can be wiped using alcohol or be dedusted using brush and dust collector instead of being wiped using wet cloth. In order to avoid possible problems, we can choose passive or positive protection by trying to keep the harmful items far away from the display and slightly wipe the display while cleaning so as to minimize the possibility of damage. 7. It is suggested that LED shall rest for more than 2 hours each day and be used for at least once a week in rainy seasons. The display shall be started up for at least once a month and be on for more than 2 hours generally. 8. LED shall be regularly examined whether or not it works normally and replaced in time if not; and examine whether or not the circuit is damaged and repair or replace it if so. 9. Don’t make the display in long-time displaying of full white, red, green or blue colors in case of overlarge current and power line radiation and thus LED damage to affect its service life. Be sure not to dismantle or stitch the display at random. 10. The relevant equipment such as LED main control computer shall be placed in a room with air conditioner and slight dusts to make sure the ventilation and radiation and stable working of computer. 11. The internal circuits of LED are forbidden to be touched by non-professionals in case of electric shock or damage of circuit. Ask the professionals to examine and repair in case of problems. 3  Preservation way of LED screen (I) Preservation of the non-installed display, standby modules and other accessories 1. Perfect moistureproof work at the storage places: appropriate environmental temperature of -40℃ ~ +85℃and relative humidity lower than 90%. 2. Prevent insects and mice from biting the display and cables during storage. 3. Prevent rainwater and other corrosive liquids from entering into or contacting the display and modules during storage. 4. Perfect the cleaning work during storage to avoid sundries or dusts piling up in the display. (II) Usage and storage of LED under special environment. 1. The display shall be avoided to be installed at dropsical places. The power of display and computer shall be cut off in time in case of extreme severe convection weathers such as typhoon, storm, hail and thunder. 2. The out-door display shall be installed with lightning arrester, and the cabinet and external steel frame shall be well grounded in case of display burnout, even human injury or death caused by lightning or display leakage. 3. For the displays which are installed in coastal areas, attention shall be paid to corrosion of metal parts of display by air salts, and the installed steel structure shall also take special consideration of the anti-typhoon ability. 4. The displays in some countries and areas may not be able to work normally due to very low temperature in winter, thus it is suggested to use low-temperature or super low-temperature power and anti low-temperature cabinet, and warm air curtain can be added if necessary.

11) After-sales service The company will provide technical support and after service of the product for users, and will also provide complete assessment advices and relevant technical suggestions in aspects of technical parameters, specifications, configuration, functions and environmental factors. All these service will assure safe, stable and efficient running of software and hardware of supplied equipment so as to ensure normal operating of users’ businesses. 1. Provide free support of service line and email address In case your maintenance personnel come across any maintaining or operating problems, you can call our after service office to consult our technical experts for the relevant problems. Our service line operates 8hours/day from 8:30 a.m. to 5:30 p.m. and 6 days/week from Monday to Saturday. No matter whatever condition our service line is under, you can contact us by the 24-hour working email address for technical support by our Engineering and Service Department. Once we receive your email, we will try our best to answer your questions and solve relevant problems as fast as we can. 2. Provide free remote assistance service In case the relevant technical problems feedback by you may not be solved by phone calls or emails in real-time, as the case may be, we will provide remote assistance or dispatch our engineers to the engineering site to help you. 3. Provide lifelong maintenance service of the product Within the maintenance period, we will take charge of maintenance of all the equipment under the contract and replace or repair all the damaged equipment or parts due to product design, installation process, materials, product quality and accessories. After the warranty period, our engineers will conduct one-time overall testing and adjusting of the large displays. When the maintenance period expires, we will provide you with the same quality spare products and parts for emergent fault replacement and possible fault maintenance during operating of large displays to ensure stable operating of system. All the replaced spare parts will be charged costs only. In case of faults of module, power or control system, you may send it back to us directly for examination and repair. Our technical staff will return it to you in time once it is surely fixed. For the cases that couldn’t be fixed, we will provide you with the same quality accessories, charging costs only. 4. Free upgrading We will offer lifelong software upgrading of your equipment to provide the latest version of control software in time. 5. Other terms and conditions The maintenance service is valid only for the originally provided equipment and original installation places and users. If the relevant equipment is re-installed in other places or the user transferred the ownership of the display equipment under the contract, the user shall inform us in written for re-assessment of relevant services. Otherwise, the relevant maintenance service will be invalid. 6. Long-time provision of spare products, parts and special tools Within the service terms and conditions, we will store sufficient quantity of the same pipe core and components of the same production batch to ensure the quality of after service so that the purchasers will not delay system operating due to lacking parts; we can provide equipment of similar types for temporary and alternate usage under special situations, so as to assure the maintenance service of the project is smoothly carried out. 7. Points for attention Our service exclude the faults or damages that are caused by negligence, accidents, natural disasters, operating not complying to the user manual, misuse and handling products not in accordance with instructions, as well as selfmodified products or missing parts. Any damage resulted from maintaining, modifying or arbitrarily changing the system by personnel without the company’s authorization shall be excluded from the maintenance service terms. In case the user, by himself, removes any mask, LED light and other appliances, which may lead to safety risks or functional faults, this product shall not be listed in the maintenance scope. Our company will not be responsible for any legal liabilities and compensations of any property losses or personnel injuries caused by natural disasters and improper operating.

Contact us: Shenzhen Q-color tech co., Ltd Add: Bldg7, Huamei Rd 8, Songgang Ave, Bao’an District, Shenzhen, 518104, China Tel: 0755-2359 0196 Fax: 0755-2908 0303 Website: http://www.q-color.com E-mail: [email protected] Zip code: 518105

III. Attachment:Basic maintenance method 1 Maintenance tools and components

Constant-temperature soldering iron and solder

Blades and tweezers

Digital multimeter

Tongs

Long and short screwdriver

Same type IC with screen

Same type fan with screen

Same type LED lamp with screen

Same type power supply with screen

2 Maintenance content a. How to replace LED module 1

4

2

5

1/2. Insert a cross screwdriver into screw holes in module rear side and unlock it in anti-clockwise way. 3. Take off module flat cable and 5V power cable. 4. Grab the handle in middle of module rear side and push it from cabinet softly. 5. Incline the module to 45 degrees and take it out from cabinet. 6 . Reverse the steps above and install module on cabinet.

3

6

b. How to change power supply

 Loosen the four screws fixing power supply board (A).  Loosen the four screws fixing power supply (B).  Take out DC output cable (C) and AC input cable (D). Take one spare power supply, reverse steps above and install it in cabinet.

c. How to replace receiving card  Take off crystal head of Ethernet cable (D).  Take out DC output power cable convergence terminal (E).  Remove flat cables or HUB (C).  Take off screws (A).  Remove mounting plate(B).  Tear down screws fixing receiving card and. Take one spare receiving card and install receiving card to cabinet

d. How to replace fan  Take off the fan AC input power cable  Remove screws (B) to take off fan.  Reverse steps above and install fans on cabinet.

Warning: Please strictly do abide by components mark to wiring when replace power supply and receiving card.

e. How to replace IC?  Remove screws on module and take out PCB board. (Waterproof module need use a blade to cut off the circle rubber around module, pry PCB board carefully with tweezers, separate PCB from module housing ).  Find out broken IC and clean up the waterproof paint.  Use soldering iron to solder tin on the pin of IC.  Use soldering iron to heat the tin of IC gradually and make it in the molten state, then remove the IC.  Put some tin on pad of the broken IC appropriately, clean up the tin slag on the pad.  Hold a same type IC with tweezers and make all the pins of IC stick correctly to IC pad (Note that the pin on the sunken round point on the left corner of IC front is the first pin, which must be welded corresponding to the small silkscreen circle of the circuit board IC).  Use soldering iron to heat the right pin of IC back and forth, so as to make tin on pad be fused with pin to fix it on pad.  Add some tin on left pin of IC, then the right one.  Incline the lamp panel to 45°, use soldering iron to heat tin on the IC pins from top to bottom and slightly cast off redundant tin which is stuck to the soldering iron until that no IC pins are connected with each other. A. When the lighting module display to normal, install the module to bottom case, waterproof module required component room temperature curing silicone rubber (black), add rubber on the place scraped rubber and also add a circle rubber around the LED board.

f. How to change LED lamp ① How to measure LED lamp? (Remark: this measurement method is applicable only to the LED lamp of this product  It cantype) be observed that there’s a very small unfilled corner among the four front corners of the LED lamp. The three pins opposite to this corner are the positive poles “+” of LED, while the three pins on its side are the negative poles of red, green and blue lamp respectively. The most directive way is to observe the silk-screen “+,R,G,B” or the unfilled corner directions of other LED lamps on LED lamp panel. Unfilled  Adjust the digital multimeter to diode test grade, use the red probe to corner contact any pin on the side of LED lamp while the black probe the three pins on the other side. If the LED lamp is lightened, the end which is contacted by the red probe is the positive pole, while the other is negative pole. If the LED lamp is not lightened, exchange the red and black probes to retest, if the lamp is still not lightened, that means the lamp is broken.

②Steps of replace SMD lamp

 Found the broken LED, use a screwdriver to remove the screws fixing the mask and take out the mask.  Use soldering iron to add tin to the pins on both sides of lamp  Use soldering iron to rapidly perform circulatory heating of tin on the pins on both sides of lamp to make it melt, so that lamp can be removed easily.  Add moderate tin to the removed lamp pad and clear off tin residues.  Take out the LED lamp of the same type with product and measure the positive and negative poles of it according to the aforesaid method.

 Clamp the LED lamp with tweezers so as to make stick to IC pad each pin correctly correspondingly.  Use soldering iron to heat tin on pad to melt with the pins on one side of the lamp, then remove the soldering iron.  Add the pins on the other side of LED lamp with tin, then the former one.  Heat to eliminate the redundant tin on pins with soldering iron (similar with the method used for replacing IC), except the three pins on the side of positive poles, the other three pins can’t be connected with each other. A 、 When the lighting module display to normal, install the module to bottom case, cover back the mask after rubber solidification.

Warning:  Non-professional technical personnel don't unauthorized attempts to repair LED module, the module can be returned to our company for repair.  Do not use sharp tools when dismantle the LED board of waterproof module, otherwise it would damage the circuit board.  When replacing IC and LED lamp, the appropriate temperature of soldering iron shall be 350℃. Welding shall be done very fast and the welding time shall not be too long, otherwise IC and LED lamp may be damaged for being overheated.  Make sure to take care during operation, in case of being scalded by soldering iron. Cut off the power

3 Production method of Ethernet cable The control system uses the through-line conforming to the national standard, both standards are applicable. The cable with RJ-4S crystal head has two arranging sequence: 568A and 568B. We often use 568B method as per the following chart:

568A type: 1 white and green, 2 green, 3 white and orange, 4 blue, 5 white and blue, 6 orange 7 white and brown, 8 brown 568B type: 1 white and orange, 2 orange, 3 white and green, 4 blue, 5 white and blue, 6 green 7 white and brown, 8 brown

Production procedures:  Put the cables into the cable clamp for about 15mm, slightly clench the clamp to rotate slowly and let the blade rip the cable protection rubber.  Remove the ripped cable protection rubber, and separate and straighten the 8 (4 pairs of) core lines respectively, then tidily arrange them according to the specified sequence.

 Press the cable tightly and use the cable clamp to cut the top of 8 lines neat to preserve about 15mm of the part without protection rubber.

 Insert the well prepared cables into the 8 slots inside RJ-45 crystal head till the end.

 Check the inserted cable to make sure the cable sequence is right without crossing and the 8 line ends are tightly fixed to the end of crystal head.

 Put the crystal head into the 8P slot of the cable clamp, tightly clench the clamp to press all the protruding stitches into the crystal head. The bottom plastic button will be pressed over the protection coat of wire. Stop while hearing a sound of slight “click”  The other end of cable shall be pressed with a crystal head as per the same line sequence. Use cable tester or connect to LED directly to test. Complete the manufacturing once there’s signal

Contact: Email: [email protected] Whatsapp & cell: +86 188 9875 8212.

Related Documents


More Documents from "Abdulraheman"