BILL OFF QUANTITY PEKERJAAN REHABILITASI GEDUNG PABRIK GEDUNG GUDANG BALAI TELKNOLOGI KESELAMATAN PELAYARAN TAHUN ANGGARAN 2019

NO

URAIAN PEKERJAAN

I 1 2 3 4 5 6

PEKERJAAN PERSIAPAN Direksi keet dan bedeng kerja listrik kerja Air kerja Dokumentasi dan laporan Papan nama proyek Mobilisasi dan Demobilisasi

II

Sub Total Pekerjaan Peninggian elavasi =0,800 cm

1 2 3 4 5

Urugan termasuk pemadaan bangunan menggunakan material sirtu / makadam tebal 65 cm Lantain Kerja Beton Plat lantai K 250 t =10 cm Wiremesh M8 1 lapis Pekerjaan RAN depan pintu besi 2 unit menggunakan pondasi batun kali dan urugan sirtu / makadam finsing beton 10 cm

- Pondasi Batu kali - Pengurungan sirtu + pemadatan - Beton plat lantai K 250 t = 10 cm Sub Total III Pekerjaan Teras Depan dan Samping 1 Bongkar teras existing 2 pembuatan tanggulan batu kali untuk peninggian teras 3 4 5 6 7 8 9

Urugan bangunan menggunakan material sirtu / makadam tebal 50 cm Lantai kerja 5 cm Beton Plat lantai K 250 t =10 cm Wiremesh M8 1 lapis Urugan tanah untuk area taman depan peninggian batu kali saluran existing Ban banan diatas peninggian batu kali Plasteran acian

HARGA SATUAN

JUMLAH HARGA

(Rp)

(Rp)

SAT

VOL

m² Ls Ls Ls Ls Ls

24 1 1 1 1 1

Rp Rp Rp Rp Rp Rp

1,302,266 11,006,875 13,915,000 1,500,000 2,200,000 8,500,000

Rp Rp Rp Rp Rp Rp Rp

31,254,384 11,006,875 13,915,000 1,500,000 2,200,000 8,500,000 68,376,259.00



196.00

Rp

345,900.50

Rp

67,796,498.00

m³ m³ m³

14.00 28.00 280.00

Rp Rp Rp

1,604,229.22 2,016,427.49 76,358.25

Rp Rp Rp

22,459,209.08 56,459,969.72 21,380,310.00

4.80 2.40 1.20

Rp Rp Rp

1,219,750.29 345,900.50 2,016,427.49

Rp Rp Rp Rp

5,854,801.39 830,161.20 2,419,712.99 177,200,662.38

ls m³

1.00 7.80

Rp Rp

550,000.00 1,219,750.29

Rp Rp

550,000.00 9,514,052.26



22.75

Rp

345,900.50

Rp

7,869,236.38

m³ m³ m³ m³ m³

3.25 6.50 65.00 4.00 21.00

Rp Rp Rp Rp Rp

1,604,229.22 2,016,427.49 76,358.25 306,300.50 1,219,750.29

Rp Rp Rp Rp Rp

5,213,744.97 13,106,778.69 4,963,286.25 1,225,202.00 25,614,756.09

m² m²

35.00 35.00

Rp Rp

94,849.46 57,917.77

Rp Rp

3,319,731.10 2,027,121.95

Rp

73,403,909.68

Sub Total IV Pembongkaran Bangunan Existing 1

Bongkar dinding pembatas office dan gudang termasuk km mandi



12.75

Rp

1,060,822.51

Rp

13,525,487.00

2 3 4 5 6 7 8 9 10 11

Pembongkaran pintu dan jendela office Pembongkaran plafond existing Pembongkaran pintu besi Pembongkaran kisi-kisi besi existing pembongkaran balok baja Wf 200x100 Pembongkaran instalasi listrik existing pembongkaran atap existing Pembongkaran CNP existing pembongkaran trenstank dan pengaku lainnya pembongkaran partisi alumunium

unit m² unit m² m¹ ls m² m¹ m² m²

4.00 40.00 2.00 70.00 70.00 1.00 385.00 420.00 385.00 60.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

960,839.00 16,920.20 1,409,601.60 90,855.60 270,358.00 2,029,647.51 11,965.80 20,601.35 13,148.85 48,745.40

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,843,356.00 676,808.00 2,819,203.20 6,359,892.00 18,925,060.00 2,029,647.51 4,606,833.00 8,652,567.00 5,062,307.25 2,924,724.00

12 pembongkaran keramik km mandi existing 13 pembongkaran kuda-kuda baja Wf existing Sub total V Pekerjaan Struktur Baja dan Bangunan 1 Penambahan kolom baja Wf ukuran existing 250x125x6x9 t-1,3m

m² m¹

3.00 88.00

Rp Rp

31,825.20 270,358.00

Rp Rp Rp

95,475.60 23,791,504.00 93,312,864.56

Kg

738.40

Rp

27,371.96

Rp

20,211,455.26

2

Penambahan plat Uk 20x40 t 12mm untuk sambungan kolom baja termasuk baut 4 buah

Kg

289.38

Rp

25,626.26

Rp

7,415,727.12

3 4 5 6 7 8 9 10 11

pemasangan kembali balok baja Wf existing 200x100 instalasi pintu besi existing termasuk penguat dll pemasangan ulang kuda - kuda baja wf existing Pengadaan dan pemasangan CNP CNP 125x50x20x2,3 Trekstang dia 10mm Bracing dia 16 mm Pengadaan dan pemasangan atap Spandek 0,4 Nok Spandek Penggantian baut existing dengan yang baru

Kg unit Kg Kg Kg Kg m² m¹ bh

1,008.00 2.00 3,062.40 1,554.00 118.40 349.28 385.00 37.00 320.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp

10,369.26 3,173,785.10 10,369.26 25,626.26 23,097.76 23,097.76 109,660.66 67,846.42 33,573.06

Rp Rp Rp Rp Rp Rp Rp Rp Rp

10,452,214.08 6,347,570.20 31,754,821.82 39,823,208.04 2,734,774.78 8,067,585.61 42,219,354.10 2,510,317.54 10,743,379.20

12

Pondasi batu kali ukuran 0,8x0,6x0,3 untuk pasangan dinding batu dan kamar mandi



5.04

Rp

1,219,750.29

Rp

6,147,541.46

m³ m¹

1.05 74.00

Rp Rp

6,941,137.61 484,040.88

Rp Rp

7,288,194.49 35,819,025.12



16.80

Rp

1,546,431.48

Rp

25,980,048.86

m¹ m²

6.00 16.80 7,119.86 7,119.86

Rp Rp Rp Rp

484,040.88 109,660.66 1,343.08 2,260.24

Rp Rp Rp Rp Rp

2,904,245.28 1,842,299.09 9,562,541.57 16,092,592.37 287,916,896.00

m¹ m² m²

54.00 27.00 108.00 108.00

Rp Rp Rp Rp

166,048.87 119,323.16 94,849.46 57,197.77

Rp Rp Rp Rp

8,966,638.98 3,221,725.32 10,243,741.68 6,177,359.16

13 Sloof uk 25x30 14 Talang BJLS termasuk rangka siku sebagai dudukan 15

Pembuatan kanopi tampak depan termasuk talang BJLS dan pangku / struktur penguat uk 2,8x6

16 17 18 19

Talang BJLS Kanopi depan Pengadaan dan pemasangan atap Spandek 0,4 Cat anti karat singkromat Baja Finishing pengecatan baja Sub total

VI 1 2 3 4

Pekerjaan Dinding Pemasangan dinding bata merah Kolom praktis Pekerjaan Plester Pekerjaan acian

5

pekerjaan perapihan dinding existing dengan siller / material lainnya



580.00

Rp

30,340.40

Rp

17,597,432.00

6 7 8 9

Openingan kusen dan jendela Pengecatan dinding area dalam Pengecatan dinding area luar Pelapis dinding ACP serat kayu interior

m¹ m² m² m²

29.10 398.00 290.00 24.20

Rp Rp Rp Rp

42,927.79 39,038.10 51,878.40 1,175,534.58

Rp Rp Rp Rp

1,249,198.69 15,537,163.80 15,044,736.00 28,447,936.84

10

Cover kolom baja menggunakan Acp termasuk rangka hollow galvanis



82.37

Rp

1,175,534.58

Rp

96,828,783.35

m² m² m² m² m²

74.88 14.40 39.60 39.60 39.60

Rp Rp Rp Rp Rp

1,175,534.58 1,175,534.58 166,048.87 94,849.46 57,917.77

Rp Rp Rp Rp Rp Rp

88,024,029.35 16,927,697.95 6,575,535.25 3,756,038.62 2,293,543.69 320,891,560.68

m² m² m² m² m² m²

16.80 52.50 80.00 4.00 22.40 200.00

Rp Rp Rp Rp Rp Rp

435,818.70 435,818.70 481,808.83 353,582.70 515,568.17 481,808.83

Rp Rp Rp Rp Rp Rp Rp

7,321,754.16 22,880,481.75 38,544,706.40 1,414,330.80 11,548,727.01 96,361,766.00 178,071,766.12

11 12 13 14 15

Pekerjaan lisplank ACP termasuk rangka hollow galvanis Cover ACP kanopu teras depan termasuk rangka hollow galvanis Pekerjaan penambahan dinding sopi - sopi Pekerjaan Plester Pekerjaan acian Sub total

VII 1 2 3 4 5 6

Pekerjaan Keramik lantai Keramik teras depan 60x60 Keramik teras samping 60x60 Keamik office Granito 60x60 Keramik kamar mandi 30x30 Keramik dinding kamar mandi 30x60 Keramik gudang ATK gornito Sub total

Kg Kg



VIII Pekerjaan Plafond 1 Rangka plafond teras depan samping dan belakang 2 3 4 5 6 7 8



233.6

Rp

121,825.11 Rp

28,458,345.70



233.6

Rp

67,814.19

Rp

15,841,394.78

m² m² m² m² m² m¹

84.00 84.00 385.00 385.00 702.60 36.00

Rp Rp Rp Rp Rp Rp

121,825.11 67,814.19 121,825.11 67,814.19 51,878.40 54,665.60

Rp Rp Rp Rp Rp Rp Rp

10,233,309.24 5,696,391.96 46,902,667.35 26,108,463.15 36,449,763.84 1,967,961.60 171,658,297.62

Pintu jendela PJ1 kusen 4" powder coating warna putih termasuk daun pintu kaca tempred 12 mm ukuran 5x2,4

unit

1.00

- Pekerjaaan kusen 4" pouder couting putih - Pekerjaan kaca mati 8 mm - Pekerjaab pintu tempred 12 mm 235 x 85 cm

m¹ m² unit

21.90 6.52 2.00

Jendela J1 Alumunium kusen 4" Powder coating warna putih ukuran 3,9 x 2,3

unit

1.00

- Pekerjaan kusen 4" pouder couting putih - Pekerjaan kaca mati 8 mm - Pekerjaan jendela alumunium Pintu P1 kaca tempred 12 mm - Pekerjaan kusen 4" pouder couting putih - Pekerjaan daun pintu kaca tempred 12 mm uk. 235 x 90 cm Pintu alumunium P2 kamar mandi - Pekerjaan kusen 4" pouder couting putih - Pekerjaan daun pintu spandril

m¹ m² m² unit m¹ unit unit m¹ m²

21.60 4.78 3.30 1.00 5.80 1.00 1.00 4.80 1.41

Jendela alumunium J2 4" powder couting warna putih tinggi 80 cm termasuk rangka dudukan kusen alumunium

unit

14.00

m¹ m²

14.00 3.44

Rp Rp

172,783.46 239,409.50

Rp Rp Rp

2,418,968.44 823,568.68 48,829,334.88

Pemasangan / pengadaan plafond teras depan samping dan belakang WR Rangka Plafond area office dan kamar mandi Pemasangan plafond area office dan kamar mandi Rangka plafond area gedung ATK Pemasangan plafond Area Gedung ATK Pengecatan Plafond Pekerjaan list plafond area office Sub total

IX Pekerjaan Pintu dan Jendela 1

2

3

4

5

- Pekerjaan kusen 4" pouder couting putih - Pekerjaan kaca mati 5 mm Sub total

Rp Rp Rp

172,783.46 365,909.50 8,626,066.24

Rp Rp Rp

3,783,957.77 2,385,729.94 17,252,132.48 -

Rp Rp Rp

172,783.46 365,909.50 1,412,131.60

Rp Rp Rp Rp Rp Rp

Rp Rp

172,783.46 8,749,480.96

Rp Rp

172,783.46 Rp 1,023,253.55 Rp

3,732,122.74 1,749,047.41 4,660,034.28 1,002,144.07 8,749,480.96 829,360.61 1,442,787.51 -

X 1 2 3 4 5 6

Pengadaan dan pemasangan sanitary Kloset duduk Toto tipe CW660NJ / SW 600J Lavatary Toto tipe LW532J+Kran TX116LEBR Kran air Toto tipe TX23B13V7NB pada Floor drain Jet Washer tipe THX20NBW + Kran THX58 Cermin uk 1400 x1100 mm

unit unit unit unit unit unit

1.00 1.00 1.00 1.00 1.00 1.54

Rp Rp Rp Rp Rp Rp

4,212,430.77 5,450,587.78 404,176.39 263,440.67 372,276.39 928,015.00

Rp Rp Rp Rp Rp Rp

4,212,430.77 5,450,587.78 404,176.39 263,440.67 372,276.39 1,429,143.10

1 2 3 4

Instalasi Air Pipa PVC 4" untuk talang termasuk knee dll Pipa PVS 4" dibawah tanah buangan dari talang ke saluran Pipa PVC 3" air bekas Pipa PVC 4" air kotor

m¹ m¹ m¹ m¹

44.00 80.00 25.00 25.00

Rp Rp Rp Rp

263,298.48 263,298.48 183,930.73 263,298.48

Rp Rp Rp Rp

11,585,133.12 21,063,878.40 4,598,268.25 6,582,462.00

Pembuatan biotenk ka 1 m3 termasuk gali pasangan bata dan tutu biotenk

unit

1.00

Rp 10,728,440.80

Rp

10,728,440.80

Pembuatan sumur resapan ukuran 1m x 1m Galian Pasangan bata Plasteran Acian Pasir Kerikil Ijuk Tutup beton resapan Perbaikan instalasi air bersih exsisting

unit m³ m² m² m² m³ m³ m³ m³ ls

1.00 1.00 4.80 4.80 4.80 0.06 0.19 0.03 0.15 1.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

116,825.50 797,034.58 455,277.41 278,005.30 19,558.21 72,832.74 17,901.91 1,041,170.64 1,387,856.31

5 6

7

116,825.50 166,048.87 94,849.46 57,917.77 325,970.20 383,330.20 596,730.20 6,941,137.61 1,387,856.31

Sub total XI Instalasi Listrik Elekrical 1 Kabel + conduit diameter 20mm untuk penerangan 2 Kabel + conduit diameter 20mm untuk stop kontak 3 Kabel + conduit diameter 20mm untuk saklar 4

Pipa refriagant gas dan liauid dari indoor ke outdoor unit c/w kabel kontrol

Rp

70,876,700.26

ttk ttk ttk

25.00 7.00 5.00

Rp Rp Rp

298,480.40 323,800.40 289,480.40

Rp Rp Rp Rp

7,462,010.00 2,266,602.80 1,447,402.00

ttk

5.00

Rp

1,397,429.00

Rp

6,987,145.00

ttk ttk

4.00 4.00

Rp Rp

486,200.00 640,200.00

ttk

5.00

Rp

323,800.40

Rp Rp Rp Rp Rp

1,944,800.00 2,560,800.00 1,619,002.00

7

Electronic ITC 2 x 0,6 mm² + conduit diameter 20 mm untuk outlet telepon UTP cat 6E + Conduit diameter 20 mm untuk outlet data MVAC NYM 3 x 2,5 mm² + Conduit diameter 20 mm untuk unit AC

8

Box MCB baru termasuk instalasi dan konekting dari listrik existing

ttk

1.00

Rp

2,072,873.00

Rp

2,072,873.00

9 10 11 12 13 14

Electrical Balk TL / RM 2x36 watt termasuk panggantung Downlight PLS 13 watt Saklar tunggal Saklar ganda Stop kontak 200 watt Stop kontak AC Sub total

ttk ttk ttk ttk ttk ttk

12.00 13.00 1.00 4.00 8.00 5.00

Rp Rp Rp Rp Rp Rp

582,200.00 180,000.00 84,182.75 89,254.44 73,292.75 143,956.75

Rp Rp Rp Rp Rp Rp Rp Rp

6,986,400.00 2,340,000.00 84,182.75 357,017.76 586,342.00 719,783.75 37,434,361.06

5 6

TOTAL SEBELUM PPN PPN 10% TOTAL SETELAH PPN DIBULATKAN

Rp 1,527,972,612.24 Rp 152,797,261.22 Rp 1,680,769,873.47 Rp 1,680,769,000.00