Grease Trap Calculation

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Grease Trap Calculation as PDF for free.

More details

  • Words: 489
  • Pages: 4
PROJECT

:

SONY VIDEO (M) SDN BHD

GREASE INTERCEPTOR CAPACITY

1)

2)

Condition Food Supply

n

:

3000 meal/day

Drainage Qty per meal

fn

:

40 L/meal

Working Hour

t

:

600 min

Retention Time

T

:

3 min

Safety Factory

k

:

3

Grease Collection per meal

gun

:

5 g/meal

Grease Accumulation

gbn

:

5 g/meal

Inflow Volume : Q Q

= = =

3)

40

x x

n 3000

x

1

t

x

k

x

1

600

x

3

600 L/min

Grease Collection Capacity : G u Gu =

gun

x

n

x

w

x

c

=

5

x

3000

x

7

x

0

=

105 Lit

where

4)

fn

w

:

Cleaning cycle

(day)

c

:

Specific volume

(L/g)

Grease Separation Volume : G s Gs =

Q

x

T

Page 1 of 4

= 600

x

3

= 1800 Lit

5)

Residue Accumulation Volume : G b Gb =

6)

gbn

x

c

x

=

5

x

0.001

x

=

105 Lit

x

w

3000 x

7

Head Space : S u Ground Level to Top of Inflow Piping

:

600 mm

Inflow Piping Dia

:

150 mm

Clearance

:

100 mm

Su

so,

7)

n

=

850 mm

Grease Interceptor Capacity Vg = =

Gu

+

Gs

+

Gb

105

+

1800

+

105

= 2010 Lit = 2000 L

x

1000 W

x

1000 H

∴ 2300 L

x

1000 W

x

1850 H

Page 2 of 4

(internal dimension)

PROJECT

:

SONY VIDEO (M) SDN BHD

GREASE INTERCEPTOR CAPACITY

1)

2)

Condition Food Supply

n

:

Drainage Qty per meal

fn

:

Working Hour

t

:

600 min

Retention Time

T

:

3 min

Safety Factory

k

:

3

Grease Collection per meal

gun

:

5 g/meal

Grease Accumulation

gbn

:

5 g/meal

Inflow Volume : Q Q

= =

fn 40

=

3)

n

x

0

x

1

t

x

k

x

1

600

x

3

0 L/min

Grease Collection Capacity : G u Gu = =

gun

x

n

x

w

x

c

5

x

0

x

7

x

0

= where

4)

x

0 Lit w

:

Cleaning cycle

(day)

c

:

Specific volume

(L/g)

Grease Separation Volume : G s Gs =

Q

x

T

Page 3 of 4

meal/day 40 L/meal

=

0

=

5)

=

0 Lit

gbn

x

c

x

n

x

w

5

x

0.001

x

0

x

7

=

0 Lit

Head Space : S u Ground Level to Top of Inflow Piping

:

600 mm

Inflow Piping Dia

:

150 mm

Clearance

:

100 mm

Su

so,

7)

3

Residue Accumulation Volume : G b Gb =

6)

x

=

850 mm

Grease Interceptor Capacity Vg =

Gu

+

Gs

+

+ 0

Gb

=

0

+

0

=

0 Lit

=

L

x

W

x

H



300 L

x

W

x

850 H

Page 4 of 4

(internal dimension)

Related Documents

Grease Trap Calculation
November 2019 12
Grease
June 2020 16
Calculation
May 2020 31
Calculation
November 2019 49
Calculation
November 2019 43