Gambar Jembatan Pulo (revised)

  • Uploaded by: MIFTAH
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Gambar Jembatan Pulo (revised) as PDF for free.

More details

  • Words: 1,598
  • Pages: 10
PEMILIK PROYEK

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SIDOARJO KEGIATAN

PENINGKATAN JEMBATAN

J L.

PAS

AR

PEKERJAAN

IKA N

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK LOKASI PEKERJAAN

KECAMATAN : SIDOARJO

JL. GAJAH MAD A

KONSULTAN PERENCANA

KLENTENG TJONG HOK KIONG

DIGAMBAR

TANDA TANGAN

RIZKI FEBRISTIANA

DIRENCANAKAN

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

JL. SISIN

GA MANG ARAJA

JL. HANG TU

JL .PA

AH

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

VIN G

MENYETUJUI KABID. BINA TEKHNIK

NG VI A .P JL

SD SABILUR ROSYAD

BANK BNI

AK AP

LOKASI PENINGKATAN JEMBATAN

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

ET .S L J

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

U

SKALA

SITUASI

1 : 1000

KODE GAMBAR

SITUASI SKALA PANJANG 1 : 1000

JUDUL GAMBAR

MASJID

NOMER GAMBAR

JUMLAH GAMBAR

1

11

KETERANGAN :

PEMILIK PROYEK

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SIDOARJO KEGIATAN

PENINGKATAN JEMBATAN

PEKERJAAN

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK

MASJID

LOKASI PEKERJAAN

KECAMATAN : SIDOARJO KONSULTAN PERENCANA

JL .S AK AP ET

23.80

DIGAMBAR

TANDA TANGAN

Panjang Balok WF (Jembatan)

22.40 Rong Abutment

RIZKI FEBRISTIANA

DIRENCANAKAN

2.25

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

JL

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

.S

MENYETUJUI

AK AP ET

KABID. BINA TEKHNIK

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

SEKOLAH

JUDUL GAMBAR

SKALA

DENAH JEMBATAN

1 : 100

KODE GAMBAR

DENAH SKALA 1 : 100

NOMER GAMBAR

JUMLAH GAMBAR

2

x 11

KETERANGAN :

PEMILIK PROYEK

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SIDOARJO KEGIATAN

PENINGKATAN JEMBATAN

PEKERJAAN

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK LOKASI PEKERJAAN

23.40 KECAMATAN : SIDOARJO

1.50

+0.85 +0.73

0.15

KONSULTAN PERENCANA

Parapet Paving 2%

DIGAMBAR

TANDA TANGAN

1.04

2%

±0.00

1.50

5.20

1.50

RIZKI FEBRISTIANA

12.00

5.20

4.54

1.50

2.15

0.50

22.40

SUPARMAN NIP. 19630402 198612 1 001

1.00

-2.45

-3.45 -3.80 -3.90

DIRENCANAKAN

DI PERIKSA OLEH

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

4.00

Pelat Pilecap Pondasi Lantai Kerja t = 10 cm Borepile Dia. 30cm

MUR SALIM, ST NIP. 19680810 199003 1 013

0.35

0.10

Abutment Pas. Batu

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI KABID. BINA TEKHNIK

-8.80

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

0.50

0.90 0.90

0.50

0.50

2.80

0.90 0.90

0.50

MENGETAHUI KEPALA DINAS

2.80 Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

SKALA

PROFIL MEMANJANG JEMBATAN

KODE GAMBAR

PROFIL MEMANJANG JEMBATAN SKALA 1 : 100

1 : 100

NOMER GAMBAR

JUMLAH GAMBAR

3

11

KETERANGAN :

PEMILIK PROYEK

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SIDOARJO

0.15

0.60

Pipa galvanis 2.5"

KEGIATAN

0.15

CL

4 Ø 12

Sier Conector D 16 - 100

8 - 15

Ø10 - 12.5

PENINGKATAN JEMBATAN 0.80

PEKERJAAN

Ø8 - 15

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK

0.20 0.12

LOKASI PEKERJAAN

WF 600 . 200 . 11 . 17 C. 299.87.9

0.74

0.60

KECAMATAN : SIDOARJO

0.25

0.50

0.50

0.50

0.25

Balok Tumpuan

0.30

0.0150

KONSULTAN PERENCANA

DIGAMBAR

TANDA TANGAN

RIZKI FEBRISTIANA

CROSS JEMBATAN SKALA 1 : 25

2.00 2.25

DIRENCANAKAN

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI

Ø10 - 12.5

KABID. BINA TEKHNIK

Ø10 - 12.5

Ø8 - 15

D 16 - 100

Ø8 - 15

D 16 - 100

D 16 - 100

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

D 16 - 100 Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

SKALA

CROSS JEMBATAN

1 : 25

KODE GAMBAR

NOMER GAMBAR

JUMLAH GAMBAR

4

11

KETERANGAN :

PEMILIK PROYEK

100 DINAS PEKERJAAN UMUM

5

10

10

10

10

10

10

10

10

10

DAN PENATAAN RUANG

5

KABUPATEN SIDOARJO

20

PENINGKATAN JEMBATAN

5

10

5

KEGIATAN

PEKERJAAN

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK

DETAIL SAMBUNGAN ATAS WF SKALA 1 : 10

LOKASI PEKERJAAN

KECAMATAN : SIDOARJO KONSULTAN PERENCANA

2%

0% TANDA TANGAN

5

DIGAMBAR

10

RIZKI FEBRISTIANA

50

10

DIRENCANAKAN

10

SUPARMAN NIP. 19630402 198612 1 001

10

DI PERIKSA OLEH

MUR SALIM, ST NIP. 19680810 199003 1 013

5

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI KABID. BINA TEKHNIK

5

10

10

10

10

10

10

10

10

10

DETAIL SAMBUNGAN SAMPING WF

5

SKALA 1 : 10

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

120 5

10

10

10

10

10

10

10

10

10

10

10

5

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

SKALA

5

JUDUL GAMBAR

1 : 10

20

10

DETAIL SAMBUNGAN

NOMER GAMBAR

JUMLAH GAMBAR

5

11

5

KODE GAMBAR

KETERANGAN :

Catatan : 1. Baut yang digunakan untuk sambungan adalah baut mutu tinggi (HTB) diameter 3/4" 2. Tebal pelat sambung t = 18mm

DETAIL SAMBUNGAN BAWAH WF SKALA 1 : 10

PEMILIK PROYEK

2.80 0.20

0.90

1.50

DINAS PEKERJAAN UMUM

0.20

DAN PENATAAN RUANG KABUPATEN SIDOARJO

1.04

KEGIATAN

PENINGKATAN JEMBATAN

PEKERJAAN

Kepala Abutment 0.90 0.70

0.20

4.54

2.15

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK LOKASI PEKERJAAN

KECAMATAN : SIDOARJO

1.00

KONSULTAN PERENCANA

TANDA TANGAN

Abutment Pas. Batu

0.73

0.10 0.35

RIZKI FEBRISTIANA

1.04

Pelat Pilecap Pondasi Lantai Kerja t = 10 cm

DIRENCANAKAN

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

Borepile Dia. 30cm

4.00

0.30

DIGAMBAR

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI KABID. BINA TEKHNIK

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

DETAIL KEPALA ABUTMENT SKALA 1 : 20 0.50

0.90

0.90

0.50

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

SKALA

2.80 TAMPAK ABUTMENT

KODE GAMBAR

NOMER GAMBAR

JUMLAH GAMBAR

6

11

KETERANGAN :

TAMPAK SAMPING ABUTMENT SKALA 1 : 50

1 : 50

PEMILIK PROYEK

DINAS PEKERJAAN UMUM

2.25 0.50 0.50 0.50

0.375

DAN PENATAAN RUANG

0.375

KABUPATEN SIDOARJO

0.72

KEGIATAN

PENINGKATAN JEMBATAN

0.32

Pelat Tumpuan Gelagar WF

PEKERJAAN

1.425

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK

3.15

0.30

4.54

LOKASI PEKERJAAN

KECAMATAN : SIDOARJO

1.425

KONSULTAN PERENCANA

0.35

DIGAMBAR

TANDA TANGAN

RIZKI FEBRISTIANA

DIRENCANAKAN

0.10

Pelat Pilecap Pondasi Lantai Kerja t = 10 cm

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

Borepile Dia. 30cm

4.00

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI KABID. BINA TEKHNIK

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

0.50

1.25

0.50

2.25

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

SKALA

TAMPAK ABUTMENT

KODE GAMBAR

TAMPAK DEPAN ABUTMENT SKALA 1 : 50

1 : 50

NOMER GAMBAR

JUMLAH GAMBAR

7

11

KETERANGAN :

PEMILIK PROYEK

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SIDOARJO KEGIATAN

PENINGKATAN JEMBATAN

0.35

PEKERJAAN

D16-150 D19-150

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK

0.10

LOKASI PEKERJAAN

KECAMATAN : SIDOARJO KONSULTAN PERENCANA

DIGAMBAR

TANDA TANGAN

PENULANGAN PELAT PILECAP SKALA 1 : 20

RIZKI FEBRISTIANA

DIRENCANAKAN

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI

0.35

KABID. BINA TEKHNIK

D19-150

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

D16-150 0.10

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

SKALA

PENULANGAN PILECAP

KODE GAMBAR

NOMER GAMBAR

JUMLAH GAMBAR

9

11

PENULANGAN PELAT PILECAP SKALA 1 : 20

1 : 20

KETERANGAN :

PEMILIK PROYEK

DINAS PEKERJAAN UMUM

Penyaluran 0.50 meter

DAN PENATAAN RUANG KABUPATEN SIDOARJO KEGIATAN

PENINGKATAN JEMBATAN

PEKERJAAN

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK LOKASI PEKERJAAN

KECAMATAN : SIDOARJO KONSULTAN PERENCANA

0.50

6 - D13 Ø8-150

4.00

D16-150

RIZKI FEBRISTIANA

D19-150

1.25

TANDA TANGAN

DIRENCANAKAN

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

D19-150 6 - D13 Ø8-150

MUR SALIM, ST NIP. 19680810 199003 1 013

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI KABID. BINA TEKHNIK

0.50

2.25

D16-150

DIGAMBAR

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

0.50

0.90

0.90

0.50

2.80

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

Ø8-150 6 - D13

SKALA

DETAIL PENULANGAN BOREPILE DAN PILECAP

1 : 10 1 : 20

DENAH BOREPILE / PENULANGAN PILECAP KODE GAMBAR

SKALA 1 : 20

NOMER GAMBAR

JUMLAH GAMBAR

10

11

0.30 KETERANGAN :

PENULANGAN BOREPILE SKALA 1 : 10

PEMILIK PROYEK

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SIDOARJO KEGIATAN

PENINGKATAN JEMBATAN

PEKERJAAN

PENINGKATAN JEMBATAN DSN. PULO KEL. SIDOKLUMPUK LOKASI PEKERJAAN

KECAMATAN : SIDOARJO KONSULTAN PERENCANA

4.00

DIGAMBAR

Parapet Paving

TANDA TANGAN

RIZKI FEBRISTIANA

DIRENCANAKAN

LPA Klas A +0.85 +0.73

SUPARMAN NIP. 19630402 198612 1 001

DI PERIKSA OLEH

±0.00 MUR SALIM, ST NIP. 19680810 199003 1 013

-0.30

DI VERIFIKASI OLEH

KASI PERENC. UMUM & TEKNIS

Timbunan Urugan Pilihan DANAR YANUASTUTI, ST NIP. 19720101 200501 2 014

MENYETUJUI KABID. BINA TEKHNIK

DETAIL OPRIT JEMBATAN SKALA 1 : 50

Ir. JUDI TETRAHASTOTO NIP. 19670423 199403 1 010

MENGETAHUI KEPALA DINAS

Ir. SIGIT SETYAWAN, MT NIP. 19611121 198903 1 008

JUDUL GAMBAR

SKALA

DETAIL OPRIT

KODE GAMBAR

1 : 50

NOMER GAMBAR

JUMLAH GAMBAR

11

11

KETERANGAN :

Related Documents

Pulo
June 2020 7
Jembatan
April 2020 26
Jembatan
December 2019 37
Jembatan Wheatstone
April 2020 21

More Documents from ""

Bab V.docx
April 2020 22
Literasi 1.pdf
April 2020 22
K. Tanbih_ghafleen.pdf
April 2020 24
585-1526-1-pb.pdf
December 2019 15