Form 02 Progress Task Form.docx

  • Uploaded by: nugrahamrfn
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Form 02 Progress Task Form.docx as PDF for free.

More details

  • Words: 397
  • Pages: 1
DESAIN III: GENERAL ARRANGEMENT & SAFETY PLAN (ME 141326)

FORM 02

TASK FORM Semester : Even

NO 1 2 3 4

5 6 7

8 9 10

NOMOR DOCUMENT / DRAWING Doc. No. 01 – 04 21 16 40000 091 - RE Doc. No. 02 – 04 21 16 40000 091 - GT

Year : 2019

ITEM DOCUMENT / DRAWING

Doc. No. 09 – 04 21 16 40000 091 - CV

Calculation of Chain Locker Volume & Mud Box

12

Dwg no. 01 - 04 21 16 40000 091 – GA

General Arrangement Drawing

14 15

TARGET

Feb. 2019

SIGNED SUPERVISOR

SIGNED COORDINATOR

Estimation of the Ship Resistance  & Engine Selection Week 4 Calculation of Gross Tonnage, Amount of Crew, Fresh Water, Fuel Oil and Lubricant Doc. No. 03 – 04 21 Calculation of Tank Capacity & 16 40000 091 - TC Pay load Doc. No. 04 - 04 21 Calculation of the Machinery of 16 40000 091 - AM Anchor, Windlas, Rudder, Loading-Unloading , and Weight Week 6 of the Construction and Machineries Doc. No. 05 - 04 21 Loading-Unloading System based 16 40000 091 - CH on the Cargo and Hatch Cover Dwg. No. 01 – 04 21 Drawing of Side View, Frame 16 40000 091 – GA Spacing and Bulkhead Week 7 Dwg no. 01 – 04 21 Drawing of Top View of the Deck, 16 40000 091 – GA Double Bottom and Tanks PROGRESS I : (Until Tank Capacity Plan & Cargo Capacity Plan) Doc. No. 06 - 04 21 Crew Explanation 16 40000 091 - CF Doc. No. 07 – 04 21 Room Arrangement 16 40000 091 - RP Doc. No. 08 – 04 21 Navigation Equipments & Lights Week 12 16 40000 091 - NA Arrangement

11

13

CHECK LIST

Rev1

PROGRESS II : Until General Arrangement Doc. No.10 - 04 21 Arrangement of the Fire Control 16 40000 091 - FP Plan Doc. No.11 - 04 21 Arrangement of the Safety Plan 16 40000 091 - SP Week 15 Dwg no. 02 - 04 21 Colored Drawing of Fire Control 16 40000 091 – FSP Plan & Safety Plan (All Reports & Drawings) PROGRESS III : Until Safety & Fire Plan Final Evaluation (Week 16)

Student

Supervisor

Desain III Coordinator

(Marfen Nugraha) NRP. 04211640000091

(Dr. Eng. Dhimas Widhi Handani, S.T.,M.Sc.) NIP. 198705272014041001

(Ede Mehta Wardhana., S.T, M.T) NIP. 1992201711048

Related Documents

Task-02-hewlettpackard.docx
November 2019 13
Progress. Progress?
June 2020 31
Progress
May 2020 26
Progress
April 2020 27

More Documents from "hally"

0cover Laporan.docx
November 2019 7
Coverlaporand2.docx
November 2019 3