DESAIN III: GENERAL ARRANGEMENT & SAFETY PLAN (ME 141326)
FORM 02
TASK FORM Semester : Even
NO 1 2 3 4
5 6 7
8 9 10
NOMOR DOCUMENT / DRAWING Doc. No. 01 – 04 21 16 40000 091 - RE Doc. No. 02 – 04 21 16 40000 091 - GT
Year : 2019
ITEM DOCUMENT / DRAWING
Doc. No. 09 – 04 21 16 40000 091 - CV
Calculation of Chain Locker Volume & Mud Box
12
Dwg no. 01 - 04 21 16 40000 091 – GA
General Arrangement Drawing
14 15
TARGET
Feb. 2019
SIGNED SUPERVISOR
SIGNED COORDINATOR
Estimation of the Ship Resistance & Engine Selection Week 4 Calculation of Gross Tonnage, Amount of Crew, Fresh Water, Fuel Oil and Lubricant Doc. No. 03 – 04 21 Calculation of Tank Capacity & 16 40000 091 - TC Pay load Doc. No. 04 - 04 21 Calculation of the Machinery of 16 40000 091 - AM Anchor, Windlas, Rudder, Loading-Unloading , and Weight Week 6 of the Construction and Machineries Doc. No. 05 - 04 21 Loading-Unloading System based 16 40000 091 - CH on the Cargo and Hatch Cover Dwg. No. 01 – 04 21 Drawing of Side View, Frame 16 40000 091 – GA Spacing and Bulkhead Week 7 Dwg no. 01 – 04 21 Drawing of Top View of the Deck, 16 40000 091 – GA Double Bottom and Tanks PROGRESS I : (Until Tank Capacity Plan & Cargo Capacity Plan) Doc. No. 06 - 04 21 Crew Explanation 16 40000 091 - CF Doc. No. 07 – 04 21 Room Arrangement 16 40000 091 - RP Doc. No. 08 – 04 21 Navigation Equipments & Lights Week 12 16 40000 091 - NA Arrangement
11
13
CHECK LIST
Rev1
PROGRESS II : Until General Arrangement Doc. No.10 - 04 21 Arrangement of the Fire Control 16 40000 091 - FP Plan Doc. No.11 - 04 21 Arrangement of the Safety Plan 16 40000 091 - SP Week 15 Dwg no. 02 - 04 21 Colored Drawing of Fire Control 16 40000 091 – FSP Plan & Safety Plan (All Reports & Drawings) PROGRESS III : Until Safety & Fire Plan Final Evaluation (Week 16)
Student
Supervisor
Desain III Coordinator
(Marfen Nugraha) NRP. 04211640000091
(Dr. Eng. Dhimas Widhi Handani, S.T.,M.Sc.) NIP. 198705272014041001
(Ede Mehta Wardhana., S.T, M.T) NIP. 1992201711048