USER MANUAL FOR PROCUREMENT CYCLE

FOR

USER MANUAL- Procurement Cycle

DOCUMENT RELEASE DETAILS

Prepared by

1

Designation

Signature

Rajiv Sarkar

Reviewed By 1

Date

Designation

Date

Signature

N.K.Kumbhakar

Approved By

Designation

Date

Signature

1

Project Name: Training

Vesion 1

Page 1

USER MANUAL- Procurement Cycle

DOCUMENT REVISION DETAILS Document Name: Version No.:

PROCUREMENT CYCLE USER MANUAL 1.0

Revision

Page

Description

Action Taken

No. No. Date

Topic

Project Name: Training

Vesion 1

Page 2

USER MANUAL- Procurement Cycle

Table of Contents 1.

INTRODUCTION ..................................................................................................................................... 4

2.

ORGANIZATION STRUCTURE ........................................................................................................... 6

3.

PROCUREMENT PROCESS OVERVIEW ......................................................................................... 8

4.

PROCUREMENT CYCLE STEPS ...................................................................................................... 11

5.

MASTER DATA MANAGEMENT ....................................................................................................... 12

a.

Material Master Maintenance............................................................................................................ 12

b.

Vendor Master Maintenance ............................................................................................................. 38

6.

MATERIAL PROCUREMENT CYCLE .............................................................................................. 55

a.

Purchase Requisition ......................................................................................................................... 55

b.

Purchase Order .................................................................................................................................... 70

c.

Creation of Contract ........................................................................................................................... 91

d.

Goods Receipt .................................................................................................................................... 102

7.

SERVICE PROCUREMENT CYCLE ............................................................................................... 107

a.

Service Purchase Requisition ........................................................................................................ 107

b.

Service Purchase Order ................................................................................................................... 119

c.

Service Entry ...................................................................................................................................... 130

8.

GOODS & SERVICE TAX(GST) ...................................................................................................... 137

a.

GST Related Oragnisational Change ........................................................................................... 137

b.

GST Related Master Data Change ................................................................................................. 138

c.

GST Related Process Change ........................................................................................................ 141

Project Name: Training

Vesion 1

Page 3

USER MANUAL- Procurement Cycle

1. INTRODUCTION SAP ERP  

It is a packaged software integrates all business functionalities together. It saves time and cost in the process

SAP MM   

Is a part of logistics area and helps to manage procurement activity of an organization supports all aspects of material management planning and control Other logistics module like Sales and distribution, Production Planning, Plant maintenance, Warehouse management are all obsessed with MM .

Features     

SAP MM deals with material management and inventory management SAP MM ensures there is never a shortage of materials or any gaps in the supply chain process It deals with the Procurement Process, Master Data (Material & Vendor Master) , Account Determination & Valuation of Material, Inventory Management, Invoice Verification, Material Requirement Planning etc.

Types of Basic Procurement: 1. External vs Internal Procurement 2. Procurement for Stock vs Consumption

External Procurement

It is the process of procuring goods or services from external vendors. There are 3 basic forms of external procurement generally supported by the Purchasing component of IT system.

 



Project Name: Training

One time orders are generally used for material and services that are ordered irregularly. Longer-term contracts with the subsequent issue of release orders - For materials that are being ordered regularly and in large quantities, we can negotiate deal with the vendor seller for pricing or conditions & record then in a contract. In a contract you also specify the validity date. Longer-term scheduling agreements and delivery schedules -

Vesion 1

Page 4

USER MANUAL- Procurement Cycle

Internal Procurement

If a material is ordered on an everyday basis and is to be delivered according to an exact time schedule, then you set up a scheduling agreement. Large corporate organizations may own multiple separate businesses or companies. Internal Procurement is process of getting material and services from among identical company. So, each of these companies maintains a complete bookkeeping system with separate Balance, Profit & Loss Statements so that when trade occurs between them it will be recorded.

Procurement for Stock

A stock material is a material that is kept in stock. These materials are kept in stock once received from the vendor. The stock of this material keeps on increasing or decreasing based on amount of the quantity received or issued. To order a material for stock, the material must have a master record within the system.

Procurement for Direct Consumption

When procurement is for direct consumption i.e. it will be consumed as soon as it is received, the user should specify the consumption purpose. To order a material for consumption, the material may have a master record within the system.

Special Procurement: Special stocks are stocks that are managed differently as these stocks did not belong to company and these are being kept at some particular location. Special procurement and special stocks types are divided into the subsequent areas. Consignment Stocks

Third-party processing

Pipeline handling

Returnable Transport Stock

Subcontracting

Project Name: Training

Material that is available at our store premises, however it still belongs to the vendor seller/Owner of the material. If you utilize the material from consignment stocks, then you have to pay to the vendor. In third-party processing, a company passes on a sales order to associate external vendor seller who sends the goods directly to the customer. The sales order is not processed by your company, however by the vendor seller. Third-party items can be entered in purchase requisitions, purchase orders and sales orders. In pipeline handling, the company needs not to order or store the material involved. It is obtainable as and when required via a pipeline for example, oil or water, or another style of cable such as electricity. The material that is consumed is settled with the vendor seller on a regular basis. The company orders goods from a vendor seller. The goods are delivered with returnable transport packaging pallets, containers that belongs to the vendor seller and is stored on the customer premises until they return it to the company. The vendor the subcontractor receives components from the ordering party with the help of which it produces a product. The product is ordered

Vesion 1

Page 5

USER MANUAL- Procurement Cycle

Stock transfer using stock transport order

by your company through a purchase order. The components required by the vendor seller to manufacture the ordered product are listed in the purchase order and provided to the subcontractor. Goods are procured and supplied within a company. One plant order the goods internally from another plant receiving plant/issuing plant. The goods are procured with a special type of purchase order - the stock transport order. You'll be able to request and monitor the transfer of goods with a stock transport order.

2. ORGANIZATION STRUCTURE Organization structure is the framework of company according to which business is conducted in every company .Organization structure consists of many levels which have relationship to one or another. Organization structure is also referred as enterprise structure. Enterprise structure is made up of many organizational units having relationship with one another.

Project Name: Training

Vesion 1

Page 6

USER MANUAL- Procurement Cycle Brief Description of various organization units: Client

Company Code

Plant

Storage Location

Purchasing Organization

Purchasing Group

Project Name: Training

The fundamental explanation of Client is as follows: Client is a commercial organizational unit in R/3 system. It has its own set of master data with independent table sets. According to hierarchy, Client is at highest level in SAP system. Data that is maintained at client level is valid for all organizational levels. The fundamental explanation of Company Code is as follows: Within Client, Company code is the independent accounting unit. It is a legal entity that has its own profit, loss and balance statement. It is the smallest unit in organization for which a complete independent account set can be replicated. The fundamental explanation of Plant is as follows: Plant is an organizational unit within a company where activities take place. A plant will produce goods and makes goods available for the company.It is unit having manufacturing facility, warehouse distribution center or a regional sales office within logistic. It subdivides an enterprise in different aspects. The fundamental explanation of Storage Location is as follows: Storage location is an organizational unit which actually differentiates between different material stocks in a Plant. Storage location is a place where stock is kept physically. Plant can be consisting of multiple storage location. All data is stored at storage location level for a particular storage location. The fundamental explanation of Purchasing Organization is as follows: Purchasing Organization is an organizational unit under company or plant which is responsible for procurement activities according to requirements. It is responsible for external Procurement. Purchasing organization can be at client level i.e. centralized purchasing organization. Purchasing organization can be at company or plant level i.e. company specific or plant specific Different forms of purchasing can be described as follows: Centralized Purchasing - Purchasing organization is not assigned to any company code it procures for all company codes belonging to different client. Company specific Purchasing - Purchasing organization is assigned to a company code only, Plant belonging to the company code can purchase through this Purchasing organization. Plant specific Purchasing - Purchasing organization is assigned to a Plant, only this specific Plant can purchase through this Purchasing organization. The fundamental explanation of Purchasing Group is as follows: Purchasing group is an organizational unit which is responsible for everyday procurement activities within an organization. It is a buyer or group of buyer responsible for procurement Vesion 1

Page 7

USER MANUAL- Procurement Cycle activities in a purchasing organization.

3. PROCUREMENT PROCESS OVERVIEW Procurement Cycle 

  

Every organization acquires material or services to complete its business needs. The process of buying materials and obtaining services from vendors or dealers is procurement. Procurement process should be done in such a way that it is ordered in correct quantity, with a proper value at the proper time. It is subdivided into following parts: Basic Procurement Special Procurement Basic Procurement



It is a process of acquiring goods or services in the right amount, at the right price at the right time.So the method of getting services, supplies, and equipment from a vendor seller, at the right price at the right time in right amount is termed as Procurement. The quality of procurement is attempting to “get the right balance”, consider the following example:



Organizations try and keep inventory levels at a minimum due to the prices associated with high levels of inventory; however at identical time it is very expensive to prevent production due to shortages in raw materials.



Getting the minimum price for a product or service is often necessary, however the balance between product availability, quality, and vendor seller relations is also necessary.

Procurement Lifecycle Most modern organizations procurement follow some sequential steps which are described below: Requirement and Information Gathering

Procurement process starts with gathering information about product and its quantity. Then for required products and services, it is necessary to look for suppliers who can satisfy the requirements. Supplier Contact

Project Name: Training

Vesion 1

Page 8

USER MANUAL- Procurement Cycle After gathering requirements one will look for the suppliers who can fulfil the requirements. Based on that quotation request or information request can be made to suppliers or direct contact can be made with them. Background Review

Once the supplier is known product/service quality is checked, and any necessities for services such as installation, warranty and its maintenance are investigated. Some samples of the products can be obtained for quality examination. Negotiation

Some negotiations with suppliers is made regarding price, availability and delivery schedule of the products/services. After this a contract is signed that is a binding legal document between supplier and ordering party. A contract will include all necessary information like price and quantity of material, delivery date, etc. Order fulfilment

Ordered material will be shipped, delivered to the ordering party and supplier is paid accordingly. Training and Installation of product or services may also be included. Consumption, Maintenance and Disposal

As the products/service is consumed the performance of the products or services is evaluated and any follow up service support if required is analysed. Contract Renewal

Once the product or services are consumed or contract expires and needs to be renewed, or the product or service is to be re-ordered, company experience with vendors and service provider is reviewed. If the products or services are to be re-ordered, the company decides whether to order from previous supplier or think about new suppliers.

Project Name: Training

Vesion 1

Page 9

USER MANUAL- Procurement Cycle Basic Procurement Activities Basic Procurement activities flow is given in the following image:

Determination of Requirements

Requisition

Purchase Order

Goods Received/Invoice Received

Invoice Brief introduction of the procurement activities: Verification/Vendor Payment

Project Name: Training

What material/services are required ?

The form or electronic transmission used to inform the purchasing department. That the item or services are needed for a business purpose

When requisition is approved purchase order is created

The material is received. Condition and quality are verified. The invoice is received from Vendor

Reconciliation of the invoice and PO is accomplished. The vendor is paid.

Vesion 1

Page 10

USER MANUAL- Procurement Cycle

Procurement activities

Description

Determination of requirement

It is the logical subdivision where it is determined that what material or services are required to company, and which supplier can fulfill the requirement.

Creating Purchase Requisition

It is the phase in which purchasing department is informed about the requirement of items or services required for business purpose. A requisition is a internal document. It is the phase when order is created from requisition and it is approved and assigned to a supplier.

Creating Purchase Order Goods receipt/ Invoice Received Invoice verification/ Vendor Payment

It is the phase in which the material is received by the company and the condition and quality are verified. In this phase Invoice is received from the vendor seller. It is the phase in which the vendor seller is paid from the company and reconciliation of the invoice.

4. PROCUREMENT CYCLE STEPS Procurement Cycle steps have been organised into the following three sections. a) Master Data Management b) Material Procurement Cycle c) Service Procurement Cycle Each of the above is elaborated into detailed steps as below. A. Master Data Management The following key master data required to run the procurement process are explained.  Material Master  Vendor Master B. Material Procurement Cycle The following basic steps of procurement cycle are elaborated  Purchase Requisition Creation/ Change & Display  Purchase Order Creation Change and Display  Goods Receipt C. Service Procurement Cycle  Service Requisition Creation/ Change & Display  Service Order Creation Change and Display  Service Entry Project Name: Training

Vesion 1

Page 11

USER MANUAL- Procurement Cycle

5. MASTER DATA MANAGEMENT a. Material Master Maintenance a) Creation of Material Master. T-code-MM01 Ster 1: Enter the T-code or go to the Menu path

Step 2: Select the Industry Sector and Material type. Press Enter

Project Name: Training

Vesion 1

Page 12

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 13

USER MANUAL- Procurement Cycle

Step 3: Select the relevant views and press Enter.

Project Name: Training

Vesion 1

Page 14

USER MANUAL- Procurement Cycle

Step 4: Enter the Plant and Storage Location. Press Enter

Project Name: Training

Vesion 1

Page 15

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 16

USER MANUAL- Procurement Cycle Step 5: Enter the relevant field data i.e. BASIC DATA-Description, Base unit of Measure, Material group, External material group and press Enter.

Project Name: Training

Vesion 1

Page 17

USER MANUAL- Procurement Cycle

PURCHASING- Purchasing Group, Tax indicator for material, GR processing time and press Enter

Project Name: Training

Vesion 1

Page 18

USER MANUAL- Procurement Cycle

Foreign Trade Import : Enter Control Code(HSN), Press Enter

Project Name: Training

Vesion 1

Page 19

USER MANUAL- Procurement Cycle

Purchase Order Text: Enter the Long Description of that Material and select the next View.

Project Name: Training

Vesion 1

Page 20

USER MANUAL- Procurement Cycle

MRP 1: Enter MRP group, MRP type, MRP controller, Lot Size and press Enter.

Project Name: Training

Vesion 1

Page 21

USER MANUAL- Procurement Cycle

MRP 2: Enter Planned Delivery time, Scheduling Margin Key and press Enter

Project Name: Training

Vesion 1

Page 22

USER MANUAL- Procurement Cycle

Planned delivery time is 0 for ext. procured material

MRP 3: Enter the Availability Check.

Project Name: Training

Vesion 1

Page 23

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 24

USER MANUAL- Procurement Cycle

Plant Data/ Storage Location 1: Period indicator for SLED

Project Name: Training

Vesion 1

Page 25

USER MANUAL- Procurement Cycle

Plant Data/Storage Location 2: enter the Profit Center

Project Name: Training

Vesion 1

Page 26

USER MANUAL- Procurement Cycle

Accounting 1: Valuation Category, Valuation Class, Price Control, Price(Standard/ Moving) and press Enter

Project Name: Training

Vesion 1

Page 27

USER MANUAL- Procurement Cycle

Step 6: Click on

Project Name: Training

to save .

Vesion 1

Page 28

USER MANUAL- Procurement Cycle

Material is created.

Project Name: Training

Vesion 1

Page 29

USER MANUAL- Procurement Cycle

Change of Material Master. T-code:MM02 Step 1:Enter the t-code or go to the menu path

Project Name: Training

Vesion 1

Page 30

USER MANUAL- Procurement Cycle

Step 2: Enter the Material No. and press Enter

Step3 : Select the View/views to change the field data.

Project Name: Training

Vesion 1

Page 31

USER MANUAL- Procurement Cycle

Step 4: Enter the relevant Plant and press Enter.

Project Name: Training

Vesion 1

Page 32

USER MANUAL- Procurement Cycle

Step 5: Do the necessary changes in relevant field .

Project Name: Training

Vesion 1

Page 33

USER MANUAL- Procurement Cycle

Step 6: Click on

Button to save the Change.

Project Name: Training

Vesion 1

Page 34

USER MANUAL- Procurement Cycle

C) Display Material Master: T-code: MM03 Step 1: Enter the T-code or go to menu path

Project Name: Training

Vesion 1

Page 35

USER MANUAL- Procurement Cycle

Step 2: Enter the Material No. and Press Enter.

Step 3: Select the view/views has to be display and press Enter .

Project Name: Training

Vesion 1

Page 36

USER MANUAL- Procurement Cycle

Step4: Enter the Plant and press Enter

Project Name: Training

Vesion 1

Page 37

USER MANUAL- Procurement Cycle

b. Vendor Master Maintenance

Project Name: Training

Vesion 1

Page 38

USER MANUAL- Procurement Cycle

A) Creation of Vendor Master Data. T-code: XK01 Step 1: Enter the T-code or go to the menu path

Step 2: Enter Company code, Purchasing Organization, Account group and press Enter

Project Name: Training

Vesion 1

Page 39

USER MANUAL- Procurement Cycle

Step 3: Enter Title, Name, Search term ½, Street/House number, Postal Code/City, Country, Region, Telephone, Fax, E-Mail and press Enter

Project Name: Training

Vesion 1

Page 40

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 41

USER MANUAL- Procurement Cycle Step 4: Enter Tax Number 1, Tax Number 3, Industry

Step 5: Enter Country, Bank key, Bank Account,

Project Name: Training

Vesion 1

Page 42

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 43

USER MANUAL- Procurement Cycle

Step 6: Enter Recon. Account, Cash mgmnt group, Release group, Certification date and press Enter

Step 7: Enter Payment Terms, Payment methods, House Bank, Check double inv.

Project Name: Training

Vesion 1

Page 44

USER MANUAL- Procurement Cycle

Step 8: Enter Account Statement and press Enter

Project Name: Training

Vesion 1

Page 45

USER MANUAL- Procurement Cycle

Step 9: Enter Order currency, Terms of payment, Incoterms, Schema Group, Vendor, GR based inv. Verification .

Project Name: Training

Vesion 1

Page 46

USER MANUAL- Procurement Cycle

Step 10: Click on

Project Name: Training

to crate Vendor master data.

Vesion 1

Page 47

USER MANUAL- Procurement Cycle

Vendor has been created for company code GRSE Purchasing Org. GRSE.

Project Name: Training

Vesion 1

Page 48

USER MANUAL- Procurement Cycle

B) Change Vendor master Data. T-code:XK02 Step 1: Enter the T-code or go to menu path.

Project Name: Training

Vesion 1

Page 49

USER MANUAL- Procurement Cycle

Step 2: Enter Vendor no., Company code, Purchase Org. and select the relevant view/views. Press Enter .

Project Name: Training

Vesion 1

Page 50

USER MANUAL- Procurement Cycle

Step 3: Click on

to save the Changes.

C) Display Vendor master Data. T-code:XK03 Step 1: Enter T-Code or go to Menu path.

Project Name: Training

Vesion 1

Page 51

USER MANUAL- Procurement Cycle

Step 2: Enter Vendor, Company Code, Purchase Organization and select the Views Enter.

Project Name: Training

Vesion 1

and press

Page 52

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 53

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 54

USER MANUAL- Procurement Cycle

Step 3: Do the necessary Changes in Relevant Field

6. MATERIAL PROCUREMENT CYCLE

a. Purchase Requisition a) Creation of Purchase Requisition: Tcode –ME51N 1. Step 1: Enter the tcode or go to the below menu:

Project Name: Training

Vesion 1

Page 55

USER MANUAL- Procurement Cycle

2. Step 2 : Press enter after entering tcode or double click on the selected menu

Project Name: Training

Vesion 1

Page 56

USER MANUAL- Procurement Cycle

3. Step 3: Enter Documet type, Text at Header note, material , quantity, plant, purchasing group, requested by , tracking no, valuation price

Project Name: Training

Vesion 1

Page 57

USER MANUAL- Procurement Cycle 4. Click on the button

5. Now click on

Project Name: Training

to check if the document is complete.

button, the purchase requisition will be created .

Vesion 1

Page 58

USER MANUAL- Procurement Cycle

b) Change purchase requisition : Tcode ME52N

1. Step 1: Enter the tcode or go to the below menu:

2. Step 2: Press enter or double click the selected menu. Then click on the purchase requisition you want to change

Project Name: Training

Vesion 1

button, enter the

Page 59

USER MANUAL- Procurement Cycle

Step 3 : Press enter

Step 4: Change the value of the field you want to change (for example quantity)

Project Name: Training

Vesion 1

Page 60

USER MANUAL- Procurement Cycle

Step 5: Click on

button. The purchase requisition is changed.

Project Name: Training

Vesion 1

Page 61

USER MANUAL- Procurement Cycle C) Display Purchase requisition. T-code- ME53N

Step 1: Enter the T-code or go to the below menu path.

3. Step 2 : Press enter after entering t-code or double click on the selected menu

Project Name: Training

Vesion 1

Page 62

USER MANUAL- Procurement Cycle

d) Print Purchase requisition. T-code: ZMM_INDENT Step1: Enter the T-code

Step2: Enter the Purchase requisition No. and click on

Project Name: Training

button.

Vesion 1

Page 63

USER MANUAL- Procurement Cycle

Step3: Go to the menu List>Print

Step4: Select the Output Device and click on

Project Name: Training

Vesion 1

Page 64

USER MANUAL- Procurement Cycle

e) Release of Purchase Requisition. T-code: ME54N Step 1: Enter the T-code or go to the menu path

Project Name: Training

Vesion 1

Page 65

USER MANUAL- Procurement Cycle

Step 2: Click on

Project Name: Training

button and enter the relevant Purchase Requisition no. and Press Enter.

Vesion 1

Page 66

USER MANUAL- Procurement Cycle

Step 3: Click on

Project Name: Training

button of relevant Release Level to release that document for 1st level

Vesion 1

Page 67

USER MANUAL- Procurement Cycle

Step 4: Click on

Project Name: Training

button of relevant Release Level to release that document for 2nd level

Vesion 1

Page 68

USER MANUAL- Procurement Cycle

Step 5: click on

Project Name: Training

button to release this document for further use.

Vesion 1

Page 69

USER MANUAL- Procurement Cycle

b. Purchase Order 7. CREATION OF PURCHASE ORDER. T-CODE:ME21N Step 1: Enter the t-code or go to the menu path

Project Name: Training

Vesion 1

Page 70

USER MANUAL- Procurement Cycle

Step 2: Select the Relevant Document Type .

Step 3: Enter Vendor, Header Texts under Test tab, Purchase org, Purchasing group, Company code under Org. Data tab Project Name: Training

Vesion 1

Page 71

USER MANUAL- Procurement Cycle

Step 4: Click on “Document Overview on”

Project Name: Training

Vesion 1

Page 72

USER MANUAL- Procurement Cycle

Step 5: Select Purchase Requition

Step 6: enter the Purchase requisition no. in the relevant field. Press

Project Name: Training

Vesion 1

button

Page 73

USER MANUAL- Procurement Cycle

Step 7: select the Purchase requisition no. and click on Purchase Order.

Project Name: Training

button to Adopt the Purchase requisition in

Vesion 1

Page 74

USER MANUAL- Procurement Cycle

Step8: Go to Condition Tab in Item Details.

Project Name: Training

Vesion 1

Page 75

USER MANUAL- Procurement Cycle Step9: Enter the Unit price of the material

Step 10: select the other condition type (Freight, Discount etc.) by clicking

Project Name: Training

Vesion 1

.

Page 76

USER MANUAL- Procurement Cycle

Step 11: Enter the Value of respective Conditions.

Project Name: Training

Vesion 1

Page 77

USER MANUAL- Procurement Cycle

Step 12: go to the invoice tab and enter the Tax code

Project Name: Training

Vesion 1

Page 78

USER MANUAL- Procurement Cycle

Step 13: Click on Taxes to see the Tax calculation.

Project Name: Training

Vesion 1

Page 79

USER MANUAL- Procurement Cycle

Step 14: Click on the PO.

button to check the PO. If no message issued during Check then Click on

Project Name: Training

Vesion 1

to save

Page 80

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 81

USER MANUAL- Procurement Cycle

b) Change of Purchase Order. T-code- ME22N Step 1: enter the t-code or go to the menu path

Project Name: Training

Vesion 1

Page 82

USER MANUAL- Procurement Cycle

Step 2: click on

to put the PO no.

Project Name: Training

Vesion 1

Page 83

USER MANUAL- Procurement Cycle

Step 3: DO THE NECESSARY CHANGES AND CLICK ON

BUTTON.

C) DISPLAY OF PURCHASE ORDER. T-code: ME23N Step 1: ENTER THE T-CODE OR GO TO THE MENU PATH

Project Name: Training

Vesion 1

Page 84

USER MANUAL- Procurement Cycle

Step 2: click on

to put the PO no. and press enter.

Project Name: Training

Vesion 1

Page 85

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 86

USER MANUAL- Procurement Cycle

D) Print of Purchase Order. Step 1: Enter the MM03 and enter and click on

button and enter the PO no. press enter.

Step 2: click on Print Overview

Project Name: Training

Vesion 1

Page 87

USER MANUAL- Procurement Cycle

Step 3: enter the output device and click on Print preview.

Project Name: Training

Vesion 1

Page 88

USER MANUAL- Procurement Cycle

Release of Purchase Order: c) Release of Purchase Order: Tcode –ME29N 6. Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 89

USER MANUAL- Procurement Cycle

7. Step 2: Click on the Release Field (L0) under Release Option column then click on the (L3) M for Higher Authority Release and save the document.

Project Name: Training

Vesion 1

Page 90

USER MANUAL- Procurement Cycle

8. Step 3: P.O Released for both P.O creator and Manager.

4. Step 4 : Save the PO.

c. Creation of Contract A) CREATION OF CONTRACT. T-CODE:ME31K STEP 1: Enter T-code or go to menu path

Project Name: Training

Vesion 1

Page 91

USER MANUAL- Procurement Cycle

Step 2: Enter the Vendor, Agreement type (value/Quantity), Agreement Date, Purchase org, Purchasing group and press Enter

Step 3: Enter Validity Start / End date, Payment terms and Incoterms.

Project Name: Training

Vesion 1

Page 92

USER MANUAL- Procurement Cycle

Step 4: Click on

button and enter the Material, Target Quantity, Net Price, Plant

Project Name: Training

Vesion 1

Page 93

USER MANUAL- Procurement Cycle

Step 5: Click on

Project Name: Training

Vesion 1

Page 94

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 95

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 96

USER MANUAL- Procurement Cycle

b) Change of Contract. T-code: ME32K Step 1: Enter the T-code or go to the menu path

Project Name: Training

Vesion 1

Page 97

USER MANUAL- Procurement Cycle

Step 2: Enter the Contract Agreement No. and press Enter.

Step 3: Do the necessary changes in the relevant field (exmpl: change in Qty). and click on

Project Name: Training

Vesion 1

button .

Page 98

USER MANUAL- Procurement Cycle

Step 4: Click on

Project Name: Training

to save the changes.

Vesion 1

Page 99

USER MANUAL- Procurement Cycle

Quantity Contract Changed.

B) DISPLAY OF CONTRACT. T-CODE: ME33K Step 1: Enter the T-code or go to the menu path.

Project Name: Training

Vesion 1

Page 100

USER MANUAL- Procurement Cycle

Step 2: Enter the Contract Agreement no. and press Enter.

Project Name: Training

Vesion 1

Page 101

USER MANUAL- Procurement Cycle

d. Goods Receipt a) Creation of Goods Receipt: Tcode –MIGO 1. Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 102

USER MANUAL- Procurement Cycle 2. Step 2: Select Good Receipt, Purchase Order from the drop down give Purchase Order Number, Document Date, Posting Date, Bill of Landing and Tick the Check Button of Individual Slip press ENTER

3. Step 3: Give Storage Location, Good Recipient, Unloading Point.

Project Name: Training

Vesion 1

Page 103

USER MANUAL- Procurement Cycle 4. Step 4: Put the Actual Quantity Received from the Vendor or Party in the Qty in Delivery Note Field and Tick the Item Ok

5. Step 5: Give the Valuation Type

6. Step 6: Click on the Check option and Post the document

A new MIGO document is created, message shown below.

Project Name: Training

Vesion 1

Page 104

USER MANUAL- Procurement Cycle 7. Step: 7 Go to Display Purchase Order and check the Good Receipt Document / Material Document is visible under tab Purchase Order History.

8. Step: 8 Select Display and Material Document option from the dropdown to display the Good Receipt Document.

Bill Tracking System

1. BTS: Tcode –ZBTSD01 1. Step 1: Enter the tcode: Give BTS Number press ENTER

2. Step: 2 Here we get all the details of BTS related to Vendor Bill Order.

Project Name: Training

Vesion 1

Page 105

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 106

USER MANUAL- Procurement Cycle 3. Step: 3 Give Remarks, Tick the Good Receipt No. if it contains Material and Service Entry Sheet No. if it contains the service.

4. Step:4 i). Click on the respective dept. ii). Click on the

button if you want to forward the button to certify the Invoice.

iii). Click on the

button for cancel or rejection.

7. SERVICE PROCUREMENT CYCLE a. Service Purchase Requisition

Service Purchase Requisition: d) Creation of Service Purchase Requisition: Tcode –ME51N 1. Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 107

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 108

USER MANUAL- Procurement Cycle

2. Step 2: After the enter the tcode or double click on the selected menu Purchase Requisition screen appears.

3). Step 3: Enter the Document Type, Header Note, Account Assignment Catg. (K), Item Category (D) Short Text, Delivery Date,Material Group, Plant, Purchase Group, Requested By, Tracking No. press Enter then automatically a below Line Item will open.

Project Name: Training

Vesion 1

Page 109

USER MANUAL- Procurement Cycle

Project Name: Training

Vesion 1

Page 110

USER MANUAL- Procurement Cycle 4). Step 4: In the below Line Item we have to fill the Service No. Short text, Quantity and Gross Price.

5. Step 5: In the Account Assignment Tab we have to give G/L Account Number, Cost Center & WBS Element Number (if necessary).

Project Name: Training

Vesion 1

Page 111

USER MANUAL- Procurement Cycle 6. Step 6: Click on the check button to check and save a new document number will be created.

Project Name: Training

Vesion 1

the Service P.R,

Page 112

USER MANUAL- Procurement Cycle b)Change of Service Purchase Requisition: Tcode –ME52N 1). Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 113

USER MANUAL- Procurement Cycle

2). Step 2 : Click on the Other Purchase Requisition tools Requisition Number/Document Number Press Enter

put the Purchase

3). Step 3 : Change the Service Quantity of the PR (As per the requirement).

Project Name: Training

Vesion 1

Page 114

USER MANUAL- Procurement Cycle 4) Step 4: Click on the save button

Project Name: Training

to save the Service P.R

Vesion 1

Page 115

USER MANUAL- Procurement Cycle c). Display of Service Purchase Requisition: Tcode –ME53N 1). Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 116

USER MANUAL- Procurement Cycle 2. Step 2: Click on the Other Purchase Requisition tools put the Purchase Requisition Number/Document Number Press Enter for display

f) Print Purchase requisition. T-code: ZMM_INDENT 1). Step1: Enter the T-code

Project Name: Training

Vesion 1

Page 117

USER MANUAL- Procurement Cycle

Step2: Enter the Purchase requisition No. and click on

button.

Step3: Go to the menu List>Print

Project Name: Training

Vesion 1

Page 118

USER MANUAL- Procurement Cycle

Step4: Select the Output Device and click on

b. Service Purchase Order Service Purchase Order: b) Creation of Purchase Order: Tcode –ME21N 1. Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 119

USER MANUAL- Procurement Cycle

2. Step 2: After enter the tcode or double click on the selected menu a new screen appear of Purchase Order.

Project Name: Training

Vesion 1

Page 120

USER MANUAL- Procurement Cycle

3. Step 3: Select the Document Type give Short Text

4. Step 4: Give Purchase Organization number, Purchase Group and Company Code under Org. Data Tab

Project Name: Training

Vesion 1

Page 121

USER MANUAL- Procurement Cycle 5. Step 5: Give the Purchase Requisition Number press ENTER then all details will be fetch from the Purchase Requisition in to the Purchase Order.

6. Step 6: Give Tax Code under Invoice Tab.

7. Step 7: In the below Line Item we can change the Conditions under Conditions Tab.

Project Name: Training

Vesion 1

Page 122

USER MANUAL- Procurement Cycle

8. Step 8: Click on the check button to check the error and save Service P.O, a new document number will be created.

Project Name: Training

Vesion 1

the

Page 123

USER MANUAL- Procurement Cycle

b) Change of Purchase Order: Tcode –ME22N 1). Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 124

USER MANUAL- Procurement Cycle

2). Step 2 : Click on the Other Purchase Order option Number Press Enter

put the Purchase Order

3). Step 3 : Change the Service Quantity of the PO (As per the requirement).

Project Name: Training

Vesion 1

Page 125

USER MANUAL- Procurement Cycle 4) Step 4: Click on the save button

Project Name: Training

to save the P.O

Vesion 1

Page 126

USER MANUAL- Procurement Cycle c). Display of Purchase Order: Tcode –ME23N 1). Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 127

USER MANUAL- Procurement Cycle 2. Step 2: Click on the Other Purchase Order option Number Press Enter for Display

put the Purchase Order

g) Print Purchase Order. 1). Step1: Click on the Print Preview Option

Project Name: Training

Vesion 1

Page 128

USER MANUAL- Procurement Cycle 2). Step2: Enter the Print Preview button.

3). Step3: Go to the menu Text>Print

Project Name: Training

Vesion 1

Page 129

USER MANUAL- Procurement Cycle

c. Service Entry Service Entry Sheet: c) Creation of Service Entry Sheet: Tcode –ML81N 2. Step 1: Enter the tcode or go to the below menu path:

Project Name: Training

Vesion 1

Page 130

USER MANUAL- Procurement Cycle

3. Step :2 Click on the Other Purchase Order option give the P.O Number press ENTER

Project Name: Training

Vesion 1

Page 131

USER MANUAL- Procurement Cycle 4. Step :3 Click on the Create New option

5. Step :4 Give Short Text and Long Text under Long Txt Tab menu

6. Step :5 Give Quality of Service and Service Timeline.

Project Name: Training

Vesion 1

Page 132

USER MANUAL- Procurement Cycle 7. Step :6 Give Completion Date under Addnl Data tab

8. Step :7 Give Document Date and Posting Date under Accept. Data Tab.

Project Name: Training

Vesion 1

Page 133

USER MANUAL- Procurement Cycle 9. Step :8 Give Service Location, Period, Responsible Internally (Company Person) and Externally (Vendor Name).

10. Step :9 Click on the Service Sel. Option to fetch the Service Line item.

Project Name: Training

Vesion 1

Page 134

USER MANUAL- Procurement Cycle 11. Step :10 Click on the Tick Button

Project Name: Training

Vesion 1

Page 135

USER MANUAL- Procurement Cycle 12. Step :11 A new screen will appear then select the Line item and click on the Services option on the top left of the screen press ENTER

13. Step :12 Click the Acceptance button Sheet. See the Green Signal Approved.

Project Name: Training

and save the Service Entry which means this Entry Sheet is

Vesion 1

Page 136

USER MANUAL- Procurement Cycle

14. Step :13 Go to Display Purchase Order and check the Service Entry sheet is visible under tab Purchase Order History.

8. GOODS & SERVICE TAX(GST) The new indirect taxation regime in India from July 2019, (GST) requires the businesses to register in every state of establishment. The registration number obtained upon registration is called as GSTIN (GST Identification Number). The GSTINs obtained by the organization must be maintained in the system, along with their registered addresses.

a. GST Related Oragnisational Change In every (A/R and A/P) transaction relevant to tax, the GSTIN of the organization must be captured in the transaction. Periodically, the GST returns are to be submitted to the Government of India, which must contain the relevant GSTIN. GST returns are to be submitted for each GSTIN separately Government of India will be able to identify the organization only through its GSTIN To facilitate this the Business Place feature needs to be activated. For every GSTIN registration in a company, a business place needs to be created in SAP and assigned to the corresponding company code. In order to ensure that every A/R and A/P transaction (triggered from Materials Management and Sales & Distribution) captures the GSTIN of the organization, the business place must be assigned to Plant Multiple plants in one state can be assigned to one Business Place

Project Name: Training

Vesion 1

Page 137

USER MANUAL- Procurement Cycle

b. GST Related Master Data Change Material Master In Material Master we have to enter “0” in the field “Tax ind. F. material” in the Purchasing Tab which indicates that the material is taxable under GST.

After that in the tab “Foreign trade import” we will enter the HSN code of that material.

Project Name: Training

Vesion 1

Page 138

USER MANUAL- Procurement Cycle

SERVICE MASTER Similarly, while creating service master in Tcode AC03, in the tax indicator field we will enter “0” which means taxable under GST and in the field “Tax Tariff Code” we will enter the relevant SAC code for that particular service.

Project Name: Training

Vesion 1

Page 139

USER MANUAL- Procurement Cycle VENDOR MASTER While creating Vendor in Tcode XK01, we will select the CIN details tab and there in the GST details tab we will select “GST VEN class” as blank which means that the vendor is registered.

Then in tax category “the TAX number 3” field we will enter the GST number of the vendor.

Project Name: Training

Vesion 1

Page 140

USER MANUAL- Procurement Cycle

c. GST Related Process Change While creating PO we will enter the relevant tax code in the Invoice tab of Item details, and in the India tab the control code of the material will appear.

Project Name: Training

Vesion 1

Page 141

USER MANUAL- Procurement Cycle

While creating Invoice in Tcode “MIRO”. After GST we will have to enter the Business place and Section in Basic Data tab under “Bus.place/sectn”.

Project Name: Training

Vesion 1

Page 142

Related Documents


More Documents from ""

Final Handbook 1.docx
December 2019 8
Final Handbook 1.docx
December 2019 9
Tsql Demos
June 2020 28
Annex D.doc
November 2019 9
Stairs.docx
November 2019 6
Surasagar.pdf
December 2019 7