Report Accompanying the Estimate for “Providing False ceiling to workshop shed and sub. Division office shed for utilizing as class rooms and Mess respectively for 21st Century Gurukulam in T.G.P. Camp colony at K.R.Dam. Estimate Rs. 2,65,167/ The Government of Andhra Pradesh have recently launched a Project by name “21st CENTURY GURUKULAM” with a good intention that the students of rural area get benefiting with day to day changes. As a part of development activity far rural areas, Andhra Pradesh, Government have decided to establish an Institute in Kandaleru Project area. In this connection S.V. University Vice Chancellor, Chairman for Higher Education Department, District Collector and Superintending Engineer, SSLC & SB Circle, Nellore along with Member of Legislative Assembly of Rapur inspected the dam site on 8.2.07 in the first instance. Subsequently a team of members from Higher Education Department of Andhra Pradesh visited dam site along with Hon’ble Minister for information & Public relation and Tourism on 26.05.2007. They have decided to make use of the existing buildings in K.R. Dam. As a part, workshop shed proposed a class rooms and Mechanical sub.division office as Mess, after getting necessary renovation work done, accommodation for 100 Nos. of students and 12 Nos. of staf in the Quarters of T.G.P. Camp colony at K.R.Dam. In this regard a meeting was conducted in Hon’ble Minister’s presence with Zilla Parishad Chairman, Nellore, Nelloe District Collector, 21st Century Gurukulam CoOrdinators and Executive Engineer, SSLC & SB Division No.2, Nellore. In above meeting it is decided to provided funds for class room shed Mess shed renovation work from Collector’s fund. Road, Gate, Fencing work from Z.P. funds and repairs to Quarters from T.G.P. Funds. In this contest, the fact is that the construction of quarters, store shed, Mechanical workshop sheds etc., were constructed during the year 1985. The formation of Kandaleru Earth dam bund was completed during the year 1997. The Work shop yard and Store yard area and sheds were utilized by the then
Mechanical staff. After 1997 there is no maintenance activity in workshop as well as store yards. Major part of Machinery kept idle were soldout conducting auction. At present only Major part is left out. Hence this estimate is prepared with the following provisions
1.
Supplying and fixing of thermo coal False Ceiling 2' x 2' (609.6mm x 609.6mm) Gide fixing anodized alluminimum “L” angle of size 24' x 38' x 1mm including with all necessary fittings for finished item of work for 25 mm thick ceiling including scaffolding Charges etc. complete
2.
Repairs to GI sheet roofing Holes with Bolts & Nuts and washers including laying of Tar Sheet on of Ridge to a width of 0.90M including cost and conveyance of all materials and labour charges.
3.
Painting to roof trushes with Metal Primary Coat and over that two coats of best enamel paint including cast and conveyance of all materials and labour charges, Centring, Scaffolding etc, complete for finished Item of work.
Rates : The rates are obtained as per current SSR for the year 2007– 2008 and local Market rates. Programme of Work : The work is to be taken up during 8/07 and will be completed 9/07 through nomination approved by District Collector. Funds : Funds are allotted from District Collector’s Fund from intrest on land funds vide Dist. Collector Lr. No: Rc.D23874/2007 Dt: 29.08.07